HomeMy WebLinkAbout06038 ORD - 01/18/1961AH:1 -18 -61
AN ORDINANCE
RECEIVING AND ACCEPTING THE REHABILITATION OF
GAS MAINS AND SERVICES IN THE DEL MAR AREA AS
PERFORMED BY W. R. COOK AIR CONDITIONING COM-
PANY UNDER THEIR CONTRACT WITH THE CITY DATED
JULY 5, 1960, AUTHORIZED BY ORDINANCE NO. 5794;
AUTHORIZING THE PAYMENT OF FINAL ESTIMATE NO. 5,
A COPY OF WHICH IS ATTACHED HERETO AND MADE A
PART HEREOF, DATED DECEMBER 21, 1960, IN THE
AMOUNT OF $3,133.23, REPRESENTING THE BALANCE DUE
THE CONTRACTOR AFTER DEDUCTION OF $225.00 FOR
LIQUIDATED DAMAGES (5 DAYS ® $45.00 PER DAY) FOR
FAILURE TO COMPLETE PROJECT WITHIN THE 60 DAYS
SPECIFIED; SAID FINAL PAYMENT TO BE MADE FROM NO.
200 GAS BOND FUNDS PREVIOUSLY APPROPRIATED FOR
THIS PROJECT, NO. 200 - 53-41; AND DECLARING AN
EMERGENCY.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS
CHRISTI, TEXAS:
•
SECTION 1. THAT THE REHABILITATION OF GAS MAINS AND SERVICES
IN THE DEL MAR AREA AS PERFORMED BY W. R. COOK AIR CONDITIONING COMPANY
UNDER THEIR CONTRACT WITH THE CITY DATED JULY 5, 1960, AS AUTHORIZED BY
ORDINANCE NO. 5794, HAVING BEEN PERFORMED AND COMPLETED IN ACCORDANCE
WITH THE TERMS AND PROVISIONS OF THE CONTRACT, PLANS AND SPECIFICATIONS
THEREIN CONTAINED, EXCEPT AS HEREINAFTER SET FORTH, AND THE DIRECTOR OF
PUBLIC WORKS HAVING INSPECTED THE SAME AND CERTIFIED TO THE COMPLETION
OF SAID WORK IN ACCORDANCE WITH SAID PLANS AND SPECIFICATIONS, EXCEPT AS
HEREINAFTER SET FORTH, THE WORK AFORESAID I5 HEREBY FOUND TO HAVE BEEN
COMPLETED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND IS HERE AND
NOW ACCEPTED AND RECEIVED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS.
SECTION 2. THAT FINAL PAYMENT DUE UNDER THE CONTRACT AND AS
SET OUT IN THE FINAL ESTIMATE ATTACHED HERETO AND MADE A PART HEREOF,
PREPARED BY THE DIRECTOR OF PUBLIC WORKS, DATED DECEMBER 21, 1960, IN
THE AMOUNT OF $3,133.23, REPRESENTING THE BALANCE DUE THE CONTRACTOR
AFTER DEDUCTION OF $223.00 FOR LIQUIDATED DAMAGES (5 DAYS ® $45.00 PER
DAY) FOR FAILURE TO COMPLETE PROJECT WITHIN THE 60 DAYS SPECIFIED, FROM
No. 200 GAS BOND FUNDS PREVIOUSLY APPROPRIATED FOR THIS PROJECT, NO.
200 - 53-41, 15 HEREBY AUTHORIZED.
6038
41,
•
ti
SECTION 3. THAT THE NECESSITY FOR COMPLETION OF SUCH WORK
BY SAID ACCEPTANCE AND FINAL PAYMENT IMMEDIATELY CREATES A PUBLIC
EMERGENCY AND AN IMPERATIVE PUBLIC NECESSITY REQUIRING THE SUSPENSION OF
THE CHARTER RULE THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY
ON THE DATE OF ITS INTRODUCTION AND THAT SUCH ORDINANCE OR RESOLUTION
SHALL BE READ AT THREE SEVERAL MEETINGS OF THE CITY COUNCIL, AND THE
MAYOR, HAVING DECLARED THAT SUCH PUBLIC EMERGENCY AND NECESSITY TO
EXIST, HAVING REQUESTED THE SUSPENSION OF SAID CHARTER RULE AND THAT
THIS ORDINANCE BE PASSED FINALLY ON THE DATE OF ITS INTRODUCTION AND THAT
THIS ORDINANCE TAKE EFFECT AND BE IN FULL FORCE AND EFFECT FROM AND AFTER
ITS 'i; GE, IT IS ACCORDINGLY PASSED AND APPROVED, THIS
ATTEST:
l Y
CITY ECRETARY
, 1961.
DAY OF
MAYOR
THE CITY OF TI, TEXAS
APPROVED AS TO p GAL FORM THIS
/6 DAY OF . 1 , 1961:
CITY ATTORNE
CITY OF CORPUS I5HRISTI, TEXAS
DEPARTMENT OF PTJBLIC WORKS — ENGINEERING & CONSTRUCTION'DIVISION
CONTRACT MONTHLY ESTIMATE
PM 2 FORM 6
RESP rrramenI0N or GAS MAINS $i MUMS - Da MAR.
'O0.53. 1
Project
Contractor: iJ +. R. Cook Air' Condition1ng C
P. 0. Pox 1223, Curpus (Uriati, Tease
Est. No 5 and Final
Date 12 -214°
Sheet 1- of 1
Item
Item Description
mXnit
1. 4" U.S. Pipe Mains
2. 2" Ulrapped Steel Mains
3. 1" Wrapped Steel Services
Contract :lmcatnt -: $26, 714.60
LUVIDATED iiil04AM S:
18 days a $45.00 - 0010.00
Contact Wm 60 Working Days'
Time Used s 78 Working Dap
Proj: 74. .
Quantities
1,268'
12,600'
6,266'
Total Work
Done on Cont.
Contract
Unit Price
Amount
1,256.o,
12,562.8'
5464.0f
1.60
1.4Q
1.10
1,884.00
17,587'42
6,03.0.4o
Approved.
City Manager
OOTBON PAENTINO cum, aG•O.eea 'NO. 9007.
Date
Total Work Done -32
Liquidated Damages 2 1i.E
gi Retained 61000
z
Amount Payable 241,672.32
Previous Payments 22,124.09
li3a,Z,3
Due This Estimate 2'53_,-
Estimate Checked��: fate
•
Public Works
S. W. 14ita,ye City Manager
Jack M. 'fit„ Director of Public Works 16 Japan :1961
Acceptance and Final Payment -- Del Mar Gas Lisa (ft* jest NO. 49.5340
1, Further refereame le made to our memorandum of above subject dated
It da m x 1961. In the previous memoramium are recommended retentioe of
liquidated daragaa In idsb e>>teat»t ct t920 for 711 UP Over= tt *$ per da'r.
1 have discussed this matter since that time at ltngte with Mr. W. H. CoOk.
Contractor, and have reviewed with elates time charges leads tercogbaut the
Job.
2. Our wort order directed the contractor to start work on whew* 18
duly 1960 and to a opiate within t3O days from &Gd alter 28 duly. The con -
tractarr emtually began some clearing work ion 3 duly on the assumption that
he would note* caged for this preliminary work. Paragraph 0 7.9 of the
specifications provides that working dtya shall be counted. beginning with
the lOth calendar day after the date of the written autbosfizatiob to 'twain
work cc mace earlier data em werrk,otbar° than the delivery or materials, le
actually commenced. Technically. therefore, we are fight in abasing time
beglseuing ois 8 duly i960. Due to the aisunderatanding, Tam willing to
recommit weiaing time charges or 8 days between 8 July maxi 18 July.
3. The contractor further claim he did not issitieclly u. deretarid. that work
could be performed an Saturdays. Time sheets indicate that he wa charged
for 2 Saturdays in August tad 3 baturda s in September although no work seas
performed except on the morning of tine 3rd Saturday' it Member. are have
since altered our epetcillcatio a to o ariry tba questioner Saturday work
Bard 1 wowed theret`azs nomad crediting the contraotar with h. days pre-
viously charged for 3atusday work.
4. In the ionise of October tlec sheets *how that it vac either raining or
the ground sae too vet beginning oo 16 October through the tad of the monthl
however,-cu day wee Charged on 22 October attar the contractor Wa beau
shut down for over a week. 1 eaa Aare that ground =Micas did not gaerait
full progress to be made during this one day and I would therefore recne-
mend that cnndy one-halt day he charged.
5. In etmmary, this waulO reduce tbs-ovorrun in time from 18 daps to $ days
and vt d result in liquidated damages of 420 lnateeld of the previown7
recmaeaded 310. Mr. Cook. while bopeiltl of eeeirae that all time charges
Could be wad, has *greed that this le a fair settlement /ugh* 1e willing
to accept it ea final..
atm M. GRAM
Director of Public Works
Jil4aer
TO THE MEMBERS OF THE CITY COUNCIL
CORPUS CHRISTI; TEXAS
•
CORPUS CHRISTI, TEXAS
/IDA Y O F p 19 4 r
FOR THE REASONS SET FORTH IN THE EMERGENCY CLAUSE OF THE FORE-
GOING ORDINANCE, A PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST FOR THE
SUSPENSION OF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE OR RESOLU-
TION SHALL BE PASSED FINALLY ON THE DATE IT IS INTRODUCED AND THAT SUCH
ORDINANCE OR RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY COUNCIL;
I�
THEREFORE, HEREBY REQUEST THAT YOU SUSPEND SAID CHARTER RULE OR REQUIRE-
MENT AND PASS THIS ORDINANCE FINALLY ON TOE DATE IT IS INTRODUCED OR AT THE
PRESENT MEETING OF THE CITY COUNCIL.
RESPECTFULLY:
MAYOR
THE CITY ( ORPUS CIt4STI, TEXAS
THE CHARTER RULE WAS SUSPENDED BY THE
EL.ROY KING
JAMES L. BARNARD
MRS. -RAY AIRNEART
JOSEPH B. DUNN
PATRICK •J. DUNNE
R. -A. HUMBLE -
GABE- LOEANOOR.
THE ABOVE ORDINANCE WAS PASSED BY THE FOLLO
ELLROY KING•
JAMES L. BARNARD
MRS. -RAY AIRNEART
JOSEPH-B. DUNN
PATRICK J. DUNNE
FOLLOWING VOTES
R. A. HUMBLE -
GABE LORANO, SR.