Loading...
HomeMy WebLinkAbout06161 ORD - 06/07/1961MW: 5 -29 -61 • AN ORDINANCE CORRECTING AND AMENDING ORDINANCE N0. 6051 ENACTED ON THE 25TH DAY OF JANUARY, 1961,, /BY AMENDING SECTION 3 THEREOF; PROVIDING THAT ALL OTHER PROVISIONS OF _ SAID ORDINANCE REMAIN IN FULL FORCE AND EFFECT; AND DECLARING AN EMERGENCY. WHEREAS, THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS, ON JANUARY 25, t961, ENACTED ITS ORDINANCE N0. 6051 BY WHICH THERE WERE LEVIED SPECIAL ASSESSMENTS AGAINST PROPERTIES ABUTTING ON THE HEREINAFTER DEFINED AND DESCRIBED PORTIONS OF AGNES AND LAREDO STREETS WITHIN SAID CITY; AND WHEREAS, IT IS THE DESIRE AND INTENTION OF SAID CITY COUNCIL TO CORRECT, AMEND AND CHANGE SECTION 3 OF SAID ORDINANCE FOR THE PURPOSE OF CORRECTING CERTAIN IRREGULARITIES, INFORMALITIES AND DISCREPANCIES OF CERTAIN SAID ABUTTING PROPERTIES AND THE ASSESSMENTS LEVIED THEREBY AND SAID OTHER PARTICULARS APPEARING IN SAID SECTION 3 OF ORDINANCE 6o51: NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. THAT SAID ORDINANCE NO. 6051, ENACTED ON THE 25TH DAY OF JANUARY, 1961, BE AND THE SAME IS HEREBY CORRECTED, AMENDED AND CHANGED SO THAT THE HEREINAFTER PROPERTY OWNERS' ASSESSMENT ROLL AS CONTAINED IN SECTION 3 THEREOF SHALL BE READ AS FOLLOWS, TO -WIT: �i OF IMPROVEMENT: WON Jffllte 17:4Nov CORRECTED FINAL . STREET IMPROVEMENT ASSESSMIT NORTH SIDE OF LAREDO STREET FROM STAPLES SfREET TO TANCAHUA STREET Sheet 1 Concrete Sidewalks, Driveways si: and I Bur -Tea Constructors, Inc. CONTRACTOR Gutters with the Base,_ Curbet Excavation 441 Face to Face of Curb ROADWAY Assessment for Curb ard Gutter & Caliehe Base for Curb September 17, 1960 & Gutter, and Street Excavation, per Lin. Ft. $2.93116 Assessment for Sidewalk per Square Foot $0.3 22 Assessment for Concrete Driveway per Square Ft. $0.5751 Assessment for Curb Ties and Thickened. Sidewalk Abutting Curbs, per Lin. Ft. $0.1278 LENGTH LIN.FT. OF ASSESSMENT LIN.FT. CARS ASSESSMENT ABUT. CURB AND CURB & GUT- SIDEWALK SIDEWALK DRIVE- DRIVEWAY TIES & THICK- CURB TIES & TOT. ASSESS- TOTAL PROPERTY OWNER NAME OF ADDITION LOT PROP- GUTTER, TER, CALICHE SQ.FT. A�SEBS- WAY ASSESS- EKED SIDEWALR THICKENED MT BEFORE ASSESSMENT ADJUSTED CALICHE BASE AND bum SQ.FT. MENEIT EDGES ABUT. SIDEWALK ADJUSTMENT ADJUSTMENT ASSESSMEI BASE AND EXCAVATION CURBS EDGES ABUT. CA CURBS i STAPLES t S T R E E a Central wharf 9 . 4Y. Robert C. Ceaaeran & Warehouse 13 & 10 90.00 90.00 263.80 ;42.08 180.12 121.3 69.79 74.00 9•46 523.17 2. Geq. J. Stein 13 11 50.00 50.00 146.56 174.58 58.01 184-36 1o6.03 25.00 3.20 313.8o John H.,Herman W. 3 Arno-W. Bebvmnn Bob. 13 12 50.00 50.00 146.56 16o.00 53.16 79.3E 45.64 245.36 4. P. E. Gneg 13 13 50.00 50.001 146.56 160.00 53.16 79. 45.64 245.36 5. Mrs. Gulia M.Martia1 13 14 50.00 50.00 146.56 160.00 53.16 79-36 45.64 245.36 6. Carmen Matta Chavans 13 15 50.00 90.00 146.56 16o.00 53 -16 79-36 45.64 245.36 7. Mrs. J. Hendricks 13 16 50.00 50.00 146.56 200.00 66.45 -0- -0- 213.01 $ I N G B T R E E T Churvh of Jesus Central Wharf 8. Chrigt of Later & Warehouse Day Saints 32 && 10 100.00 100.00 293.12 400.00 132.91 -0- -0- 426.0 9 astacia Lamas 12 & 12 100.00 100-00 293.12 360.00 119.62 79.3 45.64 458.38 10. a. Lois Rutledge 12 13 50.00 50.00 146.56 16o.00 ,.53-16 79. 45.64 245.36 11. Silos Correu 12 14 1 5o.00 50.00 146.56 16o.00 ' 53.16 79. 45.64 245.36 W 'o• :; F. ^,R .:'' El; FINAL. STREET IMPROVEMENT ASSESMENT Sheet 2 NORTH SIDE OF LAREDO STIMT FROM STAPLES SWEET TO TANCAHUA STREET POF IMPROVEMENT: Concrete Sidewalks Driveways Curbs and Bur -Tex Constructors, Inc. CONTRACTOR Gutters with cliche se, and Street Excavation 441 Face to Face of Curb ROADWAY Assessment CONTRACT DATE: September 17, 1960 &s te f C Gutter, end Street Excavation,per cLin. Ft,for Curb $2 93116 Assessment for Sidewalk per Square Foot $0.33 Assessment for Concrete Driveway per Square Ft. $0.5751 Assessment for Curb Ties and Thickened Sidewalk Abutting Curbs, per Lin. Ft. $0.1278 PROPERTY OWNER NAME OF ADDITION BLOM LOT LENGTH ABUT. PROP. LIN.FT. OF CURB AMID GUTTER, CALICHE BASE AIM EXCAVAMXOM ASSESSMENT CURB & GUT- TER, CALICHE BASE AND EXCAVATION SIDEWALK SQ.FI'. SIDEWALK ASSESS- MENT DRIVE - WAY SQ.FT. DRIVEWAY ASSESS- MENT LIN.FT. CURB TIES & THICK - SIDEWALK EDGES ABUT. CURBS ASSESSMENT CURB TIES & THICKENED SIDEWALK EDGES ABUT. CURBS TOT. ASSESS - MENT TORE ADJUSTMENT ASSESSMENT ADSUST1•4EN'T TOTAL ADJUSTED ASSESSMENT r 112. Mrs. Grace Y. urns Central Wharf & Warehouse 12 15 & 161 100.04 100. 293-12 400. 132-911 -0- -0- 426.0 C A R R I Z O S T R E E T 13. A. .T. Barton Est. " 9 6 0t-O. 'S 52.63 79.36 79-361 45. 45.6h °57.G2 243.65 14. Antonio Martinez 9 8 49.6 49.60 145.38 158. 15. 0:T.Echols 9 9 49.6 49.60 145.38 198. 65.92 -o- -0- 211.30 T A N C A H U A S T R E E T CORRECTED FINAL STREET DdPRDVEMM wawa. *v Sheet 3 SOUTH SIDE OF LAREDO STREET FROM STAPLES STREET TO TANCAHN STREET TYPE OF IMPROVEMENT: Concrete Sidewalks, Driveways, Curbs and Fur-Tex Constructors Inc. CONTRACTOR Otters with Caliche Base, and Street Excavation - Face to Face of Curb ROADWAY Assessment for Curb and Cutter & Caliche Base for Curb CONTRACT DATE: September 17, 1960 &(cutter, and Street Excavation, per Lin. Ft. $2 93 Assessment for Sidewalk per Square Foot $0.3 Assessment for Concrete Driveway per Square Ft. $0.5751 Assessment for Curb Ties and Thickened Sidewalk Abutting Curbs, per Lin. Ft. $0.1278 LIN.FT. OF ABBES24MT LIN.FT. ASSESSMENT ozs LEN URB C AND CM & WT- SID SIDEWALK DRIVE- DRIVEWAY ES TI & b8 CURB TIES TOT. TOTAL PROPERTY OWNER NAME OF ADDITION BLOCK LOT AWT. GUTTER, TER,CALICHE SQ.FT. ASSESS- WAY ASSESS- S® SIDEWALI THICK MENT BEFORE ASSESSMENT ADJUSTED PROP. CALTCHE BASS AND MS1PT SQ.FT. MENT EDGES ABUT. SIDEWALK ADJUSTMENT ASSFSSAffi9'T H BASE AND EXCAVATION CURBS EDGES ABP. EXCAVATION CURBS ip S T A P S S T R E E Hewn W. and Central Wharf 7 Arno W. Behmann & Warehouse 14 80 8 140.00 140.o0 41o.36 9 41W 79.36 14 5. G4 130.00 10.61 79.29 17. do7�n 0. Murphy Central Wharf ehouse 14 4 &5 100.00 100.00 293.12 400.00 132.91 O 0 426.03 18. O. N. Jones Central Wharf & Warehouse 14 3 50.00 50.00 146.56 160.00 53.16 79.36 45.64 245.36 1� Central Wharf 19. & Warehouse 14 1 &2 100.00 100.00 293.12 360.00 119.62 79.36 45.64 458.38 K I B a S T R E E T Central Wharf 20. Pablo Hinojosa & Warehouse 11 4 50.00 50.00 146.56 200.00 66.46 0 0 1 213.02 P1. Leo Vlahos Central Wharf & Warehouse 1l 3 50.00 50.00 146.56 160.00 53.16 79.36 45.64 245.36 22. Dorthy C. Mavity Central Wharf 11 2 50.00 50.00 146.56 152.00 50.51 93.36 53.69 250.76 & Warehouse Central Wharf 23. Ernest i4. �r.=vi:,o & Warehouse 11 1 5 50.00 50.00 146.56 160.00 53.16 79.36 45.64 245.36 24. C. H. Joseph Central Wharf & Warehouse 11 6 50.00 50.00 146.56 160.00 53.16 79.36 45.64 245-36 2 H. Cuenburg Central Wharf & Warehouse ll 7 50.00 50.00 146.56 160.00 53.16 79.36 45.64 245.36 2 v�n;_,clin,. De 1d r, 1_z Central Wharf & Warehouse 1.1 8 100.00 100.00 293.12 400.00 1 .91 0 0 426.0 i OF ndPROVffiMENT: CONTRACT DATE: CORRECTED, __,-F STREET neROVEMENT ASSESSMT Sheet k SOUTH SIDE OF LAREDO 87REEN FROM STAPLES STREET TO TARCARUA STREET Concrete Sidewalks, Driveways, Curbs and Bar -Tea Constructors Inc. CONTRACTOR Cutters with Callche Base, and Street Excavation ' Face to Face of Curb ROADWAY Assessment for Curb and Gutter & Caliche Base for Curb September 17, 1960 ti &Gutter, and Street Excavation, per Lin. Ft. $293116 Assessment for Sidewalk per Square Foot $0.33226 Assessment for Concrete Driveway per Square Ft. $6.5751 Assessment for Curb Ties and Thickened Sidewalk Abutting Curbs, per Lin. Ft. $0.1278 • •.• • :4' • �!' I' • ) • • • ; • ' L:Y : `E +f •� ..' . •:, • . •! •' YN:M• i+ ll l' •tl;rC,- :.:1Ji : w 7i t'` 1 N1 :1' H . X1 191 � mom"-, CORRECTED FINAL STREET IMPROVEMENT ASSESSMENT Sheet 5 NORTH SIDE OF AGNES STREET FROM STAPLES STREET TO OARANCAHUA STREET E OF IMPROVEMENT: Concrete Sidewalks, Driveways, Curbs and Bur -Tex Constructors, Inc. CONTRACTOR Gutter Calic a Base, and Street Excavation Face to Face of Curb ROADWAY Assessment or Curb an Gutter & Caliche Base for Curb CONTRACT DATE: September 17, 1960 & Gutter, and Street Excavation, per Lin. Ft. $2;53116 Assessment for Sidewalk per Square Foot $0.33223 Assessment for Concrete Driveway per Square Ft. 5 ",51 Assessment for Curb Ties and Thickened Sidewalk Abutting Curbs, per Lin. Ft. $0.1278 PROPERTY OWNER NAME OF ADDITIO BLOC LOT LENGTH ABUT. PROP. LIN.FT. OF CURB AMID GUTTER, CALICHE BASE AND ASSESSMENT CURB & GUT - TER, CALICIM RASE AND EXCAVATION IDEWALK SQ.FT. SIDEWALK ASSESS- MPNT DRIVE- WAY SQ.FT. DRIVEWAY ASSESS- MP14T LIN.FT. CURB TIES & THICK ENED SIDEWALE EDGES ABUT. CURBS ASSESSM314T CURB TIES & THICKENED SIDEWALK EDGES ABUT. TOT. ASSESS - MENT BEFORE ADJUSTMENT ASSESSMENT ADJUSTMENT TOTAL ADACTED ASSESSMENT i ST P LES STrRE T ?9. Frank Braslau of W. of Lot 1 L 1,2,3 4 &5 129.08 129.08 378.35 767.6 254.95 172. 99.33 107.08 1_-.68 746.31 Chamberla n 7 30. M� G. Ellis 7 w3�8 62.5 62.5 183.20 190-001 63.13 119• 68.46 314.79 31. F. W. Burnside j Ez 8 9 -lo 62.5 62.5 183.20 230.00 76.42 39.6E- 22.82 282 45 32. Joe Dunlap 7 11 -12 13 75.0 75.0 219.84 26o.00 86.39 79.3 45.64 351.8; 33- Clara N. Johnson 7 14-15 219.84 300.00 99.68 -0- -0- 119-52 K I N G S T R E E T 34. Marcus E. Lindsey Chamberlain 1,2 & 4 35• Marcus E. Lindsey Schatzel Tr. W Par st ion 225.00 225.00 659.51 900.00 299.05 -0- -0- 958.56 36. W. H. Gibbs Schatzel Tr. Wi Pkfr st ion 175.00 175.00 512.95 628.00 208.67 135.3 77.85 799 47 C A R R I Z 0 S T R E T 37 lie E. Clark Park Place 1 -A 7 123.00 123 -00 360.52 4 92.00 163.48 -0- -0- 524.00 3 • ig.Gen. M.B. Bell 1 -A 5 116.4 116.4 341.19 465.60 154.71 -0- -o- 495 90 164WE OF IIMPROVBNIENT: CONTRACT DATE: r;)RRE ;�D =FIXAL STREET IMPROVEMENT ASSESSMENT NORTH SIDE OF AG14ES STREET FROM STAPLES STREET TO CARANCAHUA STREET Concrete Sidewalks Drivewa s Curbs and. Gutters with Ca ie vase, and Street Excavation September 17, 1960 Sheet 6 Bur -Tex Constructors Inc 44' Face to Face of Cur' - Assessment for Curb and Gutter & Caliche Ease for Curb & Gutter, and Street Excavation. per Lin. Ft. Assessment for Sidewalk per square Foot Assessment for Concrete Driveway per Square Ft Assessment for Curb Ties and Thickened Sidewalk Abutting Curbs, per Lin. Ft. CO1aTiACTOR ROADWAY $2.93116 $o .. 3322:- $0.5751 $0.12 "(8 PROPERTY OWNER NAME OF ADDITION BLO LOT LENGTH ABUT. PROP. LAND . OF , E M XUAVATIQU ASSESSMENT CURB & GUT- , CALICHE AND EXCAVATION SIDEWALK SQ.F1. sibmi IbC ASSESS- MENT DRIVE- WAY SQ.FT. DRIVEWAY ASSESS- M M LIN.FT. CURB TIES & THICK EKED SIDEW EDGES ABUT. CURBS ASSESSMENT CURB TIES THICKENED SIDEWALK EDGES ABUT. CURBS TOT. ASSESS D= BEFORE ADJUSTMENT ASSESSMENT ADJUSTMEIT' TOTAL ADJUSTED ASSESSMENT • T A N A H U A S T R E T 99. Kenneth R. Darrah Brayton 2 6 136.27 136.27 399.43 545.08 181.12 -0- -0- 560 55 40. Roj 0. Crocker 2 3 135.22 135.22 396.35 540.88 179.'72 -0- -0- 576.0'; C J R A N G k H U A H �_� CORRECTED - YINAL - STREET IMPROVEMENT ASSESSMENT Sheet 7 SOUTH SIDE OF AGNES STREET FROM STAPLES STREET TO CARANCAHUA STREET *E OF 11Il'ROVEMENT: Concrete Sidewalks, Driveways Curbs and Bur -Tex Constructors, Inc. CONTRACTOR Cutters with Cali Base, Street Excavation j 441 Face to Face of Curb ROADWAY Assessment for Curb and Gutter & Caliche Base for Curb CONTRACT DATE: Septesoer 17, 1960 I & Gutter, and Street Excavation, per Lin. Ft. $2.93116 Assessment for Sidewalk per Square Foot $08 j Assessment for Concrete Driveway per Square Ft. $0.5751 Assessment for Curb Ties and Thickened Sidewalk Abutting Curbs, per Lin. Ft. $0.1279 z r PROPERTY OWNER NAME OF ADDITIOP BLOCI LOT LENGTH ABUT. PROP. LIN.FT. OF CURB AND GUTTER, CALICSE BASE AND EXCAVATION ASSESSMENT CURB & GUT- TER, CALICHE BASE AIM EXCAVATION SIDEWALK SQ.FT. SIDEWALK AS&SS- MNT DRIVE- WAY SQ.FT. RIVEWAY ASSESS- MENT LIN.FT. CURB TIES & THICK- ENM SIDEWALK EDGES ABUT. CURBS ASSESSMENT CURB TIES & THICKENED SIDEWALK EDGES ABUT. niaps TOT. ASSESS- MENT BEFORE ADJUSTMEE ASSESSMENT ADJUSTMENT TOTAL ADJUSTED ASSESSMENT S T A P L E S S R E E 41 ' Joe W. Johnson ack i Chamberlain Lot W.o t 4' 80.00 80.00 234.49 600.00 199.37 -0- -0- 80.00 10.22 444.08 42. B.Q. Ricks Chamberlain E 4 b w 14.14 86' t 3, 8 Lo 120.00 120.00 351-74 218.08 70 43. Floyd C. warner Chamberlain E 1 t 8 9&LO All lo l.) 60. 178-51 179.6o --46.96 '59.6$ 45.64 44. Mrs. Bernadine Ming Chamber All o' of Lot o 10 ,12 14 1 80.00 80.00 234.49 280.00 93.04 79.36 45.64 .1 45. Joe D, Browning Chamberlain 10 5816 o s 70.00 70.00 205.18 280.00 93.04 -O- -0- 298.22 K I N G S B E E T 46. R.L. & M.T. Purinton Chamberlain 9 2 70.36 ) R.L. & M.T. Puriaton Schatzel Tr. -O- -0-1 4.64 75.00 219.84 300.00 99.68 -0- -0- 319.52 47. Bessie C. White Schatzel Tr. -0- -0- 175.00 175.00 512.95 700.00 232.6o -0- -0- 745.55 4-8• s. Sallie E. Waltai Schatzel Tr. -0- -0- 150.00 150.00 439.67 528.GO 175.44 135.36 77.84 692.95 Aik C A A I I Z O 3 T R E E 49. s. Richard W. Davy Park Place 1 -A 227.8 227.8 667.72 911.20 302.77 -0- -0- 970.49 1-1&9 i E OF IWROVENENT: CONTRACT DATE: CORRECTED .,FINAL _ STREET IMPROVEMENT ASSESSMENT Sheet 8 SOUTH SIDE OF AGNES STREET FROM STAPLES STREET TO CARANCAHUA STREET Concrete Sidewalks Driveways Curbs and Bur -Tca Constructors, Inc. COPvTRACTOF Gutters with iche Base, and Street Excavation ' Face to Face of Curb ROADWAY Assessment for Curb and Gutter & alit a Base for Curb September 17, 1960 & Gutter, and Street Excavation, per Lin. Ft. $2.93116 Assessment for Sidewalk per Square Foot $0.3 2 Assessment for Concrete Driveway per Square Ft. $0.5751 Assessment for Curb Ties and Thickened Sidewalk Abutting Curbs, per Lin. Ft. $0.1278 o PROPERTY OWNERS NAME OF ADDITION BLOC LOT LENGTH ABUT. PROP. LIN.FT. OF CU ND CURB A M"TER, CALICHE BASE AND ASSESSMENT CURB & GUT- TER, CALICE BASE AND EXCAVATION SIDEWALK SQ. FT. SIDEWALK ASSESS- MENT DRIVE- WAY SQ.FT. DRIVEWAY ASSESS- MENT LIN.FT. CURB TIES & THICK- ENED SIDEWALK EDGES ABUT. CURBS ASSESSMENT CURB TIES & THICKENED SIDEWALK EDGES ABUT. TOT. ASSESS- MENT BEFORE ADJUSTMENT ASSESSMENT ADJUSTMENT TOTAL ADSUSTF`) ASSESSAIE_NT T A N C A H U A Sri R E S T 0'50 C.E. Munson Doddridge 1 5 134. 2., 134.22 393.42 536.88 178.40 -0- -0- 571.82 51 Kgffie Properties 1 4 137.1 337.17 402.07 548.68 182.32 -O- -0- 584.39 C A R A I C A H U A S T R I E T TOTAL ASSESSMENTS Tq PRIVATE OWNERS ._1,9;1.56 TOTAL CO 21 3.8E CITY'S PORTION $20,223-78 1 SECTION 2. THAT ALL PROVISIONS OF SAID ORDINANCE SHALL BE AND REMAIN IN FULL FORCE AND EFFECT, UNCHANGED AS HERETOFORE ENACTED EXCEPT INSOFAR AS THE SAME ARE CORRECTED AND AMENDED HEREBY. SECTION 3. THE FACT THAT THE IMPROVEMENTS TO THE AFORESAID AGNES AND LAREDO STREETS HAVE BEEN COMPLETED BY THE BUR -TEX CON- STRUCTORS, INC., CONTRACTORS, WHICH IS ENTITLED TO RECEIVE ITS PAYMENT THEREFOR, CREATES A PUBLIC EMERGENCY AND AN IMPERATIVE PUBLIC NECESSITY REQUIRING THE SUSPENSION OF THE CHARTER RULE THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE IT IS INTRODUCED AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE SEVERAL MEETINGS OF THE CITY COUNCIL, AND THE MAYOR HAVING DECLARED SUCH PUBLIC EMERGENCY AND IMPERATIVE PUBLIC NECESSITY TO EXIST, AND HAVING REQUESTED THAT SUCH CHARTER RULE BE SUSPENDED AND THAT THIS ORDINANCE BE PASSED FINALLY ON THE DATE OF ITS INTRODUCTION AND TAKE EFFECT AND BE IN FULL FORCE AND EFFECT FROM AND AFTER ITS PASSAGE, IT IS ACCORDINGL ORDAINED. PASSED AND APPROVED, THIS DAY OF , ig6i. ATTEST: p -MAYOR THE CITY OF CORPUS CHRISTI, TEXAS CITY SECRE ARY- APP D AS TO GAL FORM THIS AY OF 0 ig61: n D _ dy" CITY ATTORNEY 0 CORPUS CHRI TE %AS _�_OAY OF 19 I TO THE MEMBERS OF THE CITY COUNCIL CORPUS CHRISTI, TEXAS FOR THE REASONS SET FORTH IN THE EMERGENCY CLAUSE OF THE FORE- GOING ORDINANCES A PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST FOR THE SUSPENSION -OF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE IT IS INTRODUCED AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY COUNCIL; t, THEREFORES HEREBY REQUEST THAT YOU SUSPEND SAID CHARTER RULE OR REQUIREMENT AND PASS THIS ORDINANCE FINALLY ON THE DATE IT IS INTRODUCED OR AT THE PRESENT MEETING OF THE CITY COUNCIL. RESPECTFULLY MAYOR THE CITY OF CORPUS CHRIS ,TEXAS THE CHARTER RULE WAS SUSPENDED BY THE FOLLOWING VOTE: BEN F. MCDONALD TON R. SWANTNER DR. JAMES L. BARNARD JOSE R. DELEON M. P. MALDONADO W. J. ROBERTS JAMES H. YOUNG THE ABOVE ORDINANCE WAS PASSED BY THE FOLLOW G VOTES BEN F. MCDONALD Tom R. SWANTNER DR. JAMES L. BARNARD JOSE R. DELEON M. P. 14ALDONADO _ W. J. ROBERTS JAMES H. YOUNG