AN ORDINANCE
RECEIVING AND ACCEPTING THE CONSTRUCTION OF SANITARY
SEWER RELOCATIONS FOR UNIT II OF INTERSTATE HIGHWAY
NO. 37, DESIGNATED AS PROJECT NO. 109 -20, AS PERFORMED
BY THE CONTRACTOR, T. H.,LEE, UNDER HIS CONTRACT DATED
JUNE 13, 1962, AUTHORIZED BY ORDINANCE NO. 6546;
AUTHORIZING PAYMENT OF FINAL ESTIMATE NO. 4, DATED
OCTOBER 12, 1962, IN THE AMOUNT OF $4,8z9.97, A COPY
OF WHICH ESTIMATE IS ATTACHED HERETO AND MADE A PART
HEREOF, SAID PAYMENT TO BE MADE FROM NO. 109 SEWER
FUNDS PREVIOUSLY APPROPRIATED FOR CONSTRUCTION AND
CONTINGENCIES; AND DECLARING AN EMERGENCY.
BE IT ORDAINED BY THE CITY COUNCIL OF,THE CITY OF CORPUS CHRISTI,
TEXAS:
SECTION 1. THAT THE CONSTRUCTION OF SANITARY SEWER RELOCATIONS
FOR UNIT II OF INTERSTATE HIGHWAY No. 37,
DESIGNATED AS PROJECT N0. 109 -20,
AS PERFORMED BY THE CONTRACTOR, T. H. LEE, UNDER HIS CONTRACT DATED JUNE
13, 51962, AUTHORIZED BY ORDINANCE N0. 6546, HAVING BEEN PERFORMED AND COM-
PLETED IN ACCORDANCE WITH THE TERMS AND PROVISIONS OF THE CONTRACT, PLANS
AND SPECIFICATIONS THEREIN CONTAINED, AND THE DIRECTOR OF PUBLIC WORKS
HAVING INSPECTED THE SAME AND CERTIFIED TO THE COMPLETION OF SAID WORK
IN ACCORDANCE WITH THE SAND PLANS AND SPECIFICATIONS, THE WORK AFORESAID
IS HEREBY FOUND TO HAVE BEEN COMPLETED -IN ACCORDANCE WITH THE PLANS AND
SPECIFICATIONS AND IS HERE AND NOW ACCEPTED AND RECEIVED BY THE CITY COUNCIL
OF THE CITY OF CORPUS CHRISTI, TEXAS.
SECTION 2. THAT FINAL PAYMENT DUE UNDER THE CONTRACT AND AS
SET OUT IN THE FINAL ESTIMATE ATTACHED HERETO AND MADE A PART HEREOF, '
APPROVED BY THE DIRECTOR OF PUBLIC WORKS, DATED OCTOBER 12, 1962, IN THE
AMOUNT OF $4,829.97, SAID PAYMENT TO BE MADE FROM NO. 109 SEWER FUNDS
PREVIOUSLY APPROPRIATED FOR CONSTRUCTION AND CONTINGENCIES, IS HEREBY
AUTHORIZED.
SECTION 3. THE NECESSITY FOR COMPLETION OF SUCH WORK BY SAID
ACCEPTANCE AND FINAL PAYMENT IMMEDIATELY CREATES A PUBLIC EMERGENCY AND
• AN IMPERATIVE PUBLIC NECESSITY REQUIRING THE SUSPENSION OF THE CHARTER RULE
THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE OF ITS
INTRODUCTION AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ':AT THREE
SEVERAL MEETINGS OF THE CITY COUNCIL, AND THE MAYOR HAVING DECLARED SUCH
i
.EMERGENCY AND NECESSITY TO EXISTS HAVING REQUESTED THAT SUCH CHARTER RULE
BE SUSPENDED, AND THAT THIS ORDINANCE BE PASSED FINALLY ON THE DATE OF ITS
INTRODUCTION AND TAKE EFFECT AND BE IN FULL FORCE AND EFFECT FROM AND
AFTER ITS PASSAGE, IT IS ACCORDINGLY SO ORDAINED THIS THE AY
OF OCTOBER, 1962.
ATTES�T: /
/ '
CIiY SECRETAR
APPROVED AS TO LEGAL FORM THIS
DAY OF OCTOBER, 1962:
CITY ATTORNEY
MAYOR Pie-Tem
THE CITY OF CORPUS CHRISTI) TEXAS
•
CITY OF CORPUS CHRISTI, TEXAS
& CONSTRUCTION DIVISION
DEPARTMENT OF PUBLIC WORKS -- ENGINEERING
CONTRACT MONTHLY ESTIMATE
PW3 FORM 6
SpAI4ARY M TWDCATIOH UXIT 4 i Fins1
Pro3�t Est. N Oct 1
Date
T. R CONM� Sheet 1 °
Contractor: 6- I Contract Amount
P. • Total Work
Unit Qloi' Eat I Done on Coat Unit Price
ltem Item Description _ Quantities
_ �PxbJwT — I x_56 912•00
PAD.SRCT A
4-6' cut 4(se2)
L•8.
L.F
200
250
2t 0
250
2
8" V.C.P. 0 -4 cut (et)
M.B.'e 4-6' seep
8A.
2
gtlp TOTAL
4' Dla. Sisd.
FRW=— B
C.I.P. 8.10'ccu cut
L.F.
L'F'
417
419
400
8" Q.C.P. 6-8 S es
L.F.
335
335
5
S" V.C.p. 4-6' cut lra
Strd. N.B.'s 4-6-
8
8
4' DSS. R.'P
Extra Depth foa• atrd.
L.F
BUB TOTAL
FIt
just C oar Tape for Church
L.S
100¢
& Rau"
F5O=CT 1)
8-10' cut (ss)
L•8
L.F
230
247
230
247
L 8" V.C.P. 6-8' cut (ea))
L
L.F
_ 271
271
3
8" V.C.Y. 4 -6' out (e•)
Strd. bI.H.'r 4-6' 4"Y
Ea.
3
3
3
7 4' Dia.
8 Extra D� for Strd. RX'r
L.P
SUB TOTAL
pgpJPCT E
.C.P. 4-6' cut (se)
L.Y
Fs.
401
2
401
2
.6
L7 4' Die. Bts'd. N.B.'s 4-6' deep
SUB TOTAL
PROJECT P
4 C.Y.P. 8-10' cut
L.F
317
315
SUB TOTAL
4,102.01
2380.00
1.527.60
4.2'51 1 469.65
q 5(, 1,235.76
420.00
1,355.38
280.00
'
1 ,
X15
,397•
- CITY
OF CORPUS CHRISTI, TEXAS
& CONSTRUCTION DIVISION
DEPARTMENT OF PUBLIC WORKS
-- ENGINEERING
CONTRACT
MONTHLY ESTIMATE
-
BAZIY
�pcATTdiI DAIT II
4�_
Project aZCi1DIAY - -
Est' N
Dated-
-
Contractor: M SO78TI, WAS
DOE 6330, C
Sheer 2 of
3
Y.O.
Est
Total Work
Done on Cont.
Contract
Vdt Price
Amomt
Item Item Desedptton
No.
@uantlties
Unit Qua
,
-
1,396.98
PHOISCr 0
15. .C.P. 6-8' out (es)
L.Y. 402
Is.
398
2
3.51
140.00
20.00
280.00
17• 4' Dia. 8trd. M.H. 4-6' deep
to Strd. H.H.'e
L.Y. 3
3
SVS TOTAL
33
18. tetra Depth
9-94
3r727.50
$
P. 10-12' cut
L.F. 375
150
150
5.17
4.86
775.50
2,109.24
1.
6. 10" P.C.P. 10 -12' out (ea)
L.F.
L7, 427
434
140.00
420.00
IA" V.C.P. 8-10' out (es
ta. 3
3
12
20.00
240.0sf0;
17. 4' Die. Str& "wholes
18. yttra Depth for 8trd. I/.R.'■
L.F. 12
an TOTAL
-
�i1 .
3.06
451.62
I
10-12' cut (es)
L.F. 117
439
117
439
3.57
3.88
1,567.23
1,524.
8.
8" V.C.P. 8-10' cut (ae)
L.F.
L.B. 394
394
140.00
560:00
( )
14. 6" v.C.P. 8-10' cut as
17. 4' Die. Strd. N.H.'■
ta.
L.Y. 15
15
20.00
160.00
160.00
18. tetra Depth Sor Strd. N.H.' e
19. 4' Dis. DrOP VAnholas
Se. 1
L.F 3
1
3
30.00 .--�-
00
g�p 00
'1 5
20. Zxtrs Depth Yor DrOP M.H.'s
MM TOTAL.
271.60
PaOdECT J
f 8'10' cut (aa)
L.F. 70
55
7 0
3 88
3.51
3.38
196.56
280.54
14
15 6" v.C.P. 6-8' out (AS)
4.b' (as)
L.F.
L.F. 83
83
2
140.00
280.00
40.00
16 6, V.C.Y. cut
17 4' Dia. Btrd. U.S. 's
�. 2
2
2
20.00
- 1,
18 gxtra Depth for Strfl. K.H.
L.1
WB TOTAL
7.89
1,183•�
PRO= 1
P. 10.12' cut
L.F 150
150
7.61
7.32
1,52'U.64
3•
4. 8" C.I.P. 8-10' cut
6-8'
L.F
L -7 176
177
6Iffi TOTAL
, 1.1
5. 8" C.I.P. cut
-
--
CITY OF CORI;&S CHRISTI, TEXAS
DEPARTMENT OF PUBLIC WORKS -- ENGINEERING & CONSTRUCTION DIVISION
CONTRACT MONToHLY ESTIMATE
RAYI�RY Syy�g gap mox um n
Project Exam Est. N 4 ion
Date Oct. 1 6Q_2
Contractor: T. R• S]tE 00814tACT0as Sheet -3 —of 3
contract Un1t 1 FsL I Da anon Cont I Unit Prim I Amount
Item Item Description _
S' L nut ���
:F 6-s'
L.a.
166
166
a
5.95
190.00
987.70
28800.000
11.
17. . Strd. H.E. '■
IS. Depth for Stra. M.B.
sa.
L.Y.
4
4
8DB TOTAL
20.00
0
l+ 70
M
"a LrQ%.R.'r
Ea.
5
5
2
14000
20.00
740.00
Depth for str3. M .Se
•
1
1
160.Oo
160.00
19e. Drag M.R.
s
s
30.00
240.00
Depth for Drop M.H.
12'Dig-
L''
stir TOTAL
1 +1
0
.P. 4-6' cut
L.P.
183
180
2
3.3s
140.00
608.40
280.00
1•
17a. Staa. M.R.
2
so 40TAL
2 -4' cut
225
-5
1
3.10
115.00
697.50
115.50
Dig. Manhole
ga.
l
X���
Total Work Done
Certified
Correct: /
1�Y �Qy �l,I�
` i
Chlef of Engr. & Constr.
Date
0 %Retained — --COG- -
a.,-
2-- Amount Payable _--M- '
fie— �
Approval
Recommended:Dtceetor
Glc. iii - t -°•. --
of Panuc Works
Dat --�
Prevlous Payments— ..rrr�
Due This Estimate-- y - -
'
Date -----
Approved:
City Manager
Estimate Checked10 -12� 2
CORPUS CHRISTI, TEXAS
/ Z. OF O 19_� z
TO THE MEMBERS OF THE CITY COUNCIL
CORPUS CHRISTI, TEXAS
FOR THE REASONS SET FORTH IN THE EMERGENCY CLAUSE OF THE FORE-
GOING ORDINANCE, A PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST FOR
THE SUSPENSION-OF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE OR
RESOLUTION SHALL BE PASSED FINALLY ON THE DATE IT IS INTRODUCED, AND THAT
SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY
COUNCIL; 1', THEREFORE, HEREBY REQUEST THAT YOU SUSPEND SAID CHARTER RULE
OR REQUIREMENT AND PASS THIS ORDINANCE FINALLY ON THE DATE IT IS INTRODUCED,
OR AT THE PRESENT MEETING OF THE CITY COUNCIL.
RESPECTFULLY,
MAYOR Pm•Tem I
THE CITY OF CORPUS CHRISTI,TEXAS
THE CHARTER RULE WAS SUSPENDED BY THE FOLLOWI G VOTE:
BEN F. MCDONALD a l
TOM R. SWANTNER J
DR. JAMES L. BARNARD
JOSE R. DELEON
M. P. MALDONADO
W. J. ROBERTS
JAMES H. YOUNG
THE ABOVE ORDINANCE WAS PASSED BY THE
BEN F. MCDONALD
ToM R. $WANTNER
DR. JAMES L. BARNARD
JOSE R. DELEON
M. P. MALDONADO
W. J. ROBERTS
JAMES H. YOUNG jk'