Loading...
HomeMy WebLinkAbout07725 ORD - 09/22/1965vMP:9/22/65 AN ORDINANCE AUTHORIZING AND DIRECTING THE CITY MANAGER_, FOR AND ON BEHALF OF THE CITY OF CORPUS CHRIST , 0 EXECUTE _CROS_$2AINAGE_CONSTRUCTION AGREEMENTS BETWEEN THE STATE OF TEXAS AND CITY OF'CORPUS CHRISTI FOR CONSTRUC- TION OF OVERSIZE FACILITIES IN CONNECTION WITH THE CON- STRUCTION OF I. H. 37 FROM CORN PRODUCTS ROAD TO RAND MORGAN ROAD; APPROPRIATING OUT OF NO. 295 STORM SEWER BOND FUND THE SUM OF 2000.00 TO BE PAID TO THE STATE UPON REQUEST, PAYABLE TO THE STATE TREASURER, ACCOUNT OF TRUST FUND NUMBER 927, SAID SUM REPRESENTING THAT PORTION OF COST FOR OVERSIZING THE FACILITIES TO BE CONSTRUCTED BY THE STATE; FROM FUNDS HEREBY APPRO- PRIATED $100,000.00 AND $92,000.00, RESPECTIVELY IS APPLICABLE TO PROJECTS NO. 295 -64 -26.1 AND 295 -64 -26.2, TULE LAKE SYSTEM; REPEALING ORDLNANC.E N0. 703, PASSED AND APPROVED BY THE CITY COUNCIL ON SEPTEMBER 1, 1965; AND DECLARING AN EMERGENCY. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. THAT THE CITY MANAGER BE, AND HE IS HEREBY, AUTHORIZED ry AND DIRECTED, FOR AND ON BEHALF OF THE CITY OF CORPUS,CHRISTI, TO EXECUTE CROSS DRAINAGE CONSTRUCTION AGREEMENTS BETWEEN THE STATE OF TEXAS AND CITY OF CORPUS CHRISTI FOR CONSTRUCTION OF OVERSIZE FACILITIES IN CONNECTION WITH THE CONSTRUCTION OF 1. H. 37 FROM CORN PRODUCTS ROAD TO RAND MORGAN ROAD. SECTION 2. THERE IS HEREBY APPROPRIATED OUT OF N0. 295 STORM SEWER BOND FUND THE SUM OF $192,000.00 TO BE PAID TO THE STATE UPON REQUEST, PAYABLE TO THE STATE TREASURER, ACCOUNT OF TRUST FUND NUMBER 927, SAID SUM REPRESENTING THAT PORTION OF COST FOR OVERSIZING THE FACILITIES TO BE CONSTRUCTED BY THE STATE. OF THE FUNDS HEREBY APPROPRIATED $100,000.00 AND $92,000.00, RESPECTIVELY, IS APPLICABLE TO PROJECTS NO. 295 -64 -26.1 AND 295 -64 -26.2, TULE LAKE SYSTEM. SECTION 3. ORDINANCE NO. 7703, PASSED AND APPROVED BY THE CITY COUNCIL ON SEPTEMBER 1, 1965, IS HEREBY REPEALED. SECTION 4. THE NECESSITY TO AUTHORIZE THE EXECUTION OF THE HEREINABOVE DESCRIBED AGREEMENT AND TO APPROPRIATE THE NECESSARY FUNDS it IN ORDER THAT THE DESCRIBED CONSTRUCTION MAY BE BEGUN PROMPTLY CREATES A PUBLIC EMERGENCY AND AN IMPERATIVE PUBLIC NECESSITY REQUIRING THE SUSPENSION OF THE CHARTER RULE THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE OF ITS INTRODUCTION AND THAT SUCH ORDINANCE OR 7725 ' RESOLUTION SHALL BE READ AT THREE SEVERAL MEETINGS OF THE CITY COUNCIL, AND THE MAYOR HAVING DECLARED SUCH EMERGENCY AND NECESSITY TO EXIST, AND HAVING REQUESTED THE SUSPENSION OF THE CHARTER RULE AND THAT THIS ORDI- NANCE BE PASSED FINALLY ON THE DATE OF ITS INTRODUCTION AND TAKE EFFECT AND BE IN FULL FORCE AND EFFECCTTJ FRROOM AND AFTER ITS PASSAGE, IT IS ACCORDINGLY SO ORDAINED, THIS THE p1 1� DAY OF SEPTEMBER, 1965. ATTEST: CITY ECRETARY YO THE CITY OF CORPUS CHRISTI; TEXAS APPROVED AS TO LEGAL FORM THIS 7e_ DAY OFSEPTEMBER, 1965: CITY ATTORNEY' �• �. l ,r � a a t� t PROJECT: 137- 1(23)Oo6 CONTROL: 74 -6-57 ' I.H. 37: FROM CORN PRODUCTS ROAD TO RAND MORGAN ROAD , NUECES COUNTY CROSS DRAINAGE-CONSTRUCTION AGREEMENT STATE OF TEXAS COUNTY OF NUECES t` THIS AGREEMENT, MADE THIS �- DAY OF BY AND BETWEEN THE STATE OF TEXAS, REPRESENTED BY THE STATE HIGHWAY ENGINEER, ' HEREINAFTER REFERRED TO AS THE "STATE", PARTY OF THE FIRST PART, AND THE CITY OF CORPUS CHRISTI, (NUECES COUNTY, TEXAS, ACTING BY AND THROUGH ITS DULY AUTHORIZED OFFICERS AS AUTHORIZED BY ORDINANCE PASSED ON THE DAY OF 196_, HEREINAFTER REFERRED TO AS THE "CITY", PARTY OF THE SECOND PART. W I T N E S S E T H WHEREAS, THE CITY AND THE STATE ARE COOPERATING IN THE CONSTRUCTION OF A CONTROLLED ACCESS HIGHWAY ON HIGHWAY NO. i. 37 FROM CORN PRODUCTS ROAD TO RAND MORGAN ROAD; AND ' WHEREAS, SAID HIGHWAY REQUIRES THE CONSTRUCTION OF ROADSIDE DITCHES AND CROSS DRAINAGE STRUCTURES FOR PROPER DRAINAGE; AND WHEREAS, IT IS CONSIDERED THE STATE'S RESPONSIBILITY TO PROVIDE SAID DRAINAGE FACILITIES FOR SAID CONTROLLED ACCESS HIGHWAY RIGHT OF WAY AND ALL OF THE NATURAL DRAINAGE WHICH CROSSES THE RIGHT OF WAY LINES OF SAID CONTROLLED ACCESS HIGHWAY; AND ' WHEREAS, THE CITY HAS REQUESTED THE STATE TO PROVIDE CROSS DRAINAGE STRUCTURES AND/OR OUTFALL SYSTEMS SUFFICIENT TO DRAIN CERTAIN AREAS OUTSIDE THE AREAS THAT NOW DRAIN NATURALLY TO THE SAID RIGHT OF WAY LINES; AND WHEREAS, THE SAID AREAS,OUTSIDE THE NATURAL DRAINAGE AREAS ARE CONSID- ERED THE RESPONSIBILITY OF THE CITY; AND . -tr x ' WHEREAS, IT IS IN THE PUBLIC INTEREST THAT THE CITY AND THE STATE COOPERATE IN THE CONSTRUCTION OF CROSS DRAINAGE STRUCTURES AND /OR OUTFALL CHANNELS TO PROVIDE DRAINAGE FOR THE ENTIRE AREA UNDER CONSIDERATIONS AND WHEREAS, SURVEYS, DESIGNS AND COST ESTIMATES MADE COOPERATIVELY BY THE CITY AND THE STATE HAVE DETERMINED: (1) THE AREA TO BE CONSIDERED (2) THE CROSS DRAINAGE STRUCTURE QND/OR OUTFALL REQUIREMENTS FOR THE AREAS UNDER CONSIDER - ATION; (3) THE RELATIVE FINANCIAL RESPONSIBILITY OF THE CITY AND THE STATE; ALL OF WHICH ARE SHOWN ON A DRAWING MARKED EXHIBIT "A °, ATTACHED HERETO AND MADE A' PART HEREOF; AND ' WHEREAS, IT IS DEEMED ADVISABLE THAT THE CITY AND THE STATE EACH DIS- CHARGE THEIR RESPECTIVE RESPONSIBILITIES WITH REGARD TO CONSTRUCTION OF THE SAID CROSS DRAINAGE STRUCTURES AND /OR OUTFALLS BY THE STATE CONSTRUCTING, AND ATHE CITY AND STATE PAYING THE APPLICABLE COSTS OF THE DRAINAGE'FACILITIES, AS SHOWN ON EXHIBIT "A11, ATTACHED HERETO. A G R E E M E N T NOW, THEREFORE, IT IS AGREED AND UNDERSTOOD THAT: Y ' THE STATE WILL PROCEED AT THE EARLIEST PRACTICABLE DATE TO CONSTRUCT AT ITS OWN COST AND EXPENSE THE CROSS DRAINAGE STRUCTURES AND /OR OUTFALLS SHOWN ON EXHIBIT "A ", ATTACHED HERETO AND MARKED "TO BE BUILT BY THE STATE". THE STATE WILL MAINTAIN ALL OUTFALL CHANNELS OR STRUCTURES OUTSIDE THE LIMITS OF THE INTERSTATE HIGHWAY RIGHT OF WAY. AS SOON AS THE CITY BEGINS TO ADD DRAINAGE FROM DIVERTED AREAS SHOWN ON EXHIBIT "A", THE CITY WILL ASSUME FULL RESPONSIBILITY FOR MAINTAINING ALL OUTFALL CHANNELS OR-STRUCTURES OUTSIDE THE LIMITS OF THE INTERSTATE HIGHWAY RIGHT OF WAY. THE CITY WILL INDEMNIFY THE STATE AGAINST ANY AND ALL DAMAGES AND CLAIMS FOR DAMAGES AGAINST THE STATE RESULTING FROM DIVERTED DRAINAGE WATER FROM THE AREAS OUTSIDE THE NATURAL DRAINAGE DIVIDES. ALL JUDGMENTS FOR SUCH DAMAGES OF ANY TRIAL COURT OR SUCH APPELLATE COURT TO WHICH AN APPEAL ON REQUEST OF THE CITY HAS BEEN TAKEN, SHALL BE PAID BY THE CITY UPON SUCH JUDGMENT BECOMING FINAL. SUCH PAYMENTS SHALL INCLUDE THOSE DAMAGES RESULTING FROM INJURY TO OR DEATH OF PERSONS OR FOR LOSS OF OR DAMAGE TO PROPERTY AND ANY AND ALL-COURT COSTS, ATTOR- NEY'S FEES AND EXPENSES RELATED TO OR CONNECTED WITH ANY CLAIMS OR SUITS FOR DAMAGES RESULTING FROM SUCH DIVERSION. IF REgUESTED IN WRITING BY THE STATE TO DO SO, THE CITY -SHALL ASSIST THE STATE WITH OR RELIEVE THE STATE FROM DEFENDING ANY SUCH SUITS BROUGHT AGAINST IT. IT' IS AGREED THAT THE AMOUNT OF PARTICIPATION IN CONSTRUCTION OF CROSS DRAINAGE STRUCTURES AND /OR OUTFALLS WILL BE BASED ON THE AMOUNTS OF THE FINAL CON- TRACT BID PRICES, AND QUANTITIES SHOWN ON EXHIBIT "A "., THE CITY'S PAYABLE SHARE -2- FOR ALL OF THESE DRAINAGE FACILITIES AS INDICATED ON THE EXHIBIT "A ", INCLUDING ENGINEERING AND CONTINGENCIES, IS ESTIMATED TO BE ONE HUNDRED NINETY -TWO THOUSAND DOLLARS ($192,000.00), ON THE PROJECT FROM CORN PRODUCTS ROAD TO RAND MORGAN ROAD, AND THE CITY WILL TRANSMIT TO THE STATE, UPON REQUEST BY THE STATE A WARRANT MADE + PAYABLE TO THE STATE TREASURER, ACCOUNT OF TRUST FUND NUMBER 927 IN THE AMOUNT OF ONE HUNDRED NINETY -TWO THOUSAND DOLLARS ($192,000.00), TO BE USED AS THE CITY'S PAYABLE SHARE OF ALL THE PROPOSED JOINT PARTICIPATION WORK FROM CORN PRODUCTS ROAD TO RAND MORGAN Road. IF, AFTER THE STATE RECEIVES BIDS FOR WORK ON THESE DRAINAGE FACILITIES, IT IS FOUND THAT THE AMOUNT OF THE CITY'S PORTION OF THE ' ACTUAL CONSTRUCTION COST ON THE CONSTRUCTION PROJECT IS MORE THAN THE AMOUNT + PREVIOUSLY PAID INTO TRUST FUND NUMBER 927, THEN THE CITY UPON REQUEST OF THE STATE WILL FORTHWITH SUPPLEMENT THIS AMOUNT BY AN AMOUNT EQUAL TO THE ACTUAL COST LESS THE AMOUNT PREVIOUSLY PAID. IN THE EVENT THAT THE AMOUNT AS PAID IS MORE THAN THE ACTUAL COST OF THE CITY'S SHARE, AS HEREIN ESTABLISHED, THEN THE EXCESS AMOUNT WILL BE RETURNED TO THE CITY. IT IS AGREED THAT ENGINEERING COSTS, INCLUDING DESIGN, CONTRACT LETTING COSTS, SURVEYING, INSPECTION AND SUPERVISION, SHALL BE EIGHT PERCENT %) OF THE FINAL CONSTRUCTION COST OF THE CROSS DRAINAGE STRUCTURES AND/OR OUTFALLS. AT THE COMPLETION OF THE CONSTRUCTION PROJECT, THE FINAL PARTICIPATION QUANTITIES WILL BE MUTUALLY AGREED TO BY BOTH PARTIES. I -3- IN WITNESS WHEREOF, THE PARTIES HAVE HERETO AFFIXED THEIR SIGNATURES, THE CITY OF CORPUS CHRISTI ON THE DAY OF , t96 , AND THE STATE ON THE DAY OF CITY OF CORPUS CHRISTI THE STATE OF TEXAS CERTIFIED AS BEING'EXECUTED FOR THE PURPOSE AND EFFECT OF ACTIVATING AND BY: OR CARRYING OUT TOE ORDERS, ESTABLISHED HERBERT W. WHITNEY POLICIES, OR WORK PROGRAM HERETOFORE • APPROVED AND AUTHORIZED BY THE STATE ' HIGHWAY COMMISSION: TITLE: CITY MANAGER BY: ATTEST: EXECUTED AS STATE HIGHWAY ENGINEER ' AND APPROVED FOR STATE HIGHWAY COMMISSION RECOMMENDED FOR APPROVAL: CITY SECRETARY _APPROVED AS TO LEGAL FORM THIS THE 1.- DAY OF SEPTEMBER , 196j_: ' DISTRICT ENGINEER CITY ATTORNEY , ' BRIDGE ENGINEER CHIEF ENGINEER OF HIGHWAY DESIGN AlUGUST 27,, 1965 I CERTIFY TO THE CITY COUNCIL THAT THE MONEY REQUIRED FOR THE CONTRACT, AGREEMENT, OBLIGATION, OR EXPENDITURE CONTEMPLATED IN THE ABOVE AND FOREGOING ORDINANCE IS IN THE TREASURY OF THE CITY OF CORPUS CHRISTI TO THE CREDIT OF NO. 295 STORM SEWER FUND PROJECT No. 295 -* 26.1 $100,000.00 PROJECT No. 295-6 26.2 92,000.00 192,000.00 FUND FROM WHICH IT IS PROPOSED TO BE DRAWN, AND SUCH MONEY IS NOT APPROPRIATED FOR ANY OTHER PURPOSE. t ,/DIRECTOR q {FINANCE b� L TO THE MEMBERS OF THE CITY COUNCIL CORPUS CHRISTI, TEXAS I" M1 � CORPUS CHRISTI, TEXAS DAY OF 19�J `• FOR THE REASONS SET FORTH IN THE EMERGENCY CLAUSE OF THE FORE- GOING ORDINANCE, A PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST FOR THE SUSPENSION OF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE IT IS INTRODUCED, AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY COUNCIL; I, THEREFORE, HEREBY REQUEST THAT YOU SUSPEND SAID CHARTER RULE OR REQUIREMENT AND PASS THIS ORDINANCE FINALLY ON THE DATE IT IS INTRO - DUCED, OR AT THE PRESENT MEETING OF THE CITY COUNCIL. RESPECTFULLY, MAYOR THE CITY OF CORPUS CHRISTI, TEXAS THE CHARTER RULE WAS SUSPENDED BY THE FOLLOWING VOTE: DR. MCIVER FURMAN r JACK BLACKMON PATRICK J. DUNNE is DR. P. JIMENEZ, JR. KEN MCDANIEL RONNIE SIZEMORE WM. H. WALLACE THE ABOVE ORDINANCE WAS PASSED BY THE FOLLOWI G VOTE: DR. MCIVER FURMAN JACK BLACKMON PATRICK J. DUNNE DR. P. JIMENEZ, JR. KEN MCDANIEL RONNIE SIZEMORE WM. H. WALLACE p c ` 'V 4 fi; , . � 'y �`,�.- .yam „ . c . - '� • , '" sp. • - -.•- ■ • ^ SUMMARY OF COST PARTICIPATION EST. COST BASED ON STATE (NATURAL) DRAINAGE ONLY \\ !EST. COST BASED ON CITY. a STATE(NAT' a DI V) DRAINAGE . \ESTIMATE COST TO CITY OF CORPJJS CHRISTI • . • • ,„ - ',V'. • o 1 __L p " STATE ONLY" CONSTRUCTION • 7- t .... I CITY-STATE , CONSTRUCTION • • --- CITY-STATE 0 NSTRUCT ION Vei • WWII. , 1)1 I' • •„*.2.„ T7LiftA'''6-1L-itliE . . .- •141T,;;--;•• 311,500.0d: 'J\ , Cost Estimate of "State Only" Cons ruction , Outfa I ITEM 11 750'- 6X6 850'-7X6 UNIT f'-Class A t, Concrete r--.3inf. Steel WJnc•l. Struct.Excay. Channel Excay. -!JC1.7BI Conc.Riprat., • . •';i0- „, . Steel pr.)inf - r- • Unc I Struct.Excciv. oncrete „et, , Chorine( Excay., Outfall "C" ( 365 -----7---=-___ML_3 __-- ' . '---.------ 71 _ - --- ----7,--=-----7"-- , I C ,.... I / ' -; ..- s i. I N I• '`''' \ I • 1\.‘■1 Vs-1<--------. 4, Os` 4 • • _ • CONSTRUCTION ttl•'• taP • • • ' z s " , • • • - I /), CONSTRUCTION cI TY-STATE • Outfall "J" Cioss A Concrete Reinf_ Steel UncI,Struct.Excqv 48 " Sewer Pipe Channel Excav ••••: • LB SCNA a PWNAND 1)6 5 0 OF CHA NNEL QUINT UNIT PRICE 933.79 3,6.00 33,66 0, te 70437 1.50 977S21 0 5C :tJM. 3 2 CO SUB TOTA L AMOUNT 34841. 02 13 316.80, • 10 582.31 9, 889.i 1 1 C 5.28 76, 379.5,2 X6 SCNA& PWN AND o CHANNEt. ....I et: I .38 CO 0 1 0 1 50 .050 SUB TOTAL -9487. 08 4, 140 90 1 365 00 25 15, - " RCP CL SC N &PWN AND 80010F CHANNEL) cY LB CY LF CY 102 658 576 260 3720 SUB TOTAL CC O 10 0 300 O 50 SUB TOTAL ENGINEERING ( 8%) CONT1N G E NOE S( 2%) - TOTAL 4i8. 46 3, a 76 0 e 5 • :17_ 00 3, 6 36000 9 108 , 6 1 0 8 70E,. 2, 1 76..64 . 1! 9., 50C.00 Cost Estimate of"City-State Combined" Construction Due to City- Diverted Drainage 11 3664:- 1C> Tr , = ITEM - UNIT )clq5s . A Concrete CY .H. Reinf Steel • LB : , Uncl, StrUrt 1-7 xrov CY , _ , ,, .....,_ ,...: ,I Type B -Monhoes EA ' S.MinRd. Items 'LS Outfall "CH ( 365' 1 X lassil.A" Concrete, CY P,enf Steel LB Uncl.Struct.Excav CY C.h LB' Excov CY B Conc Riprop CY Outfa "kJ ( 276 f---9X72,13,; Ifis`'A" Concrete CY Reinf SteeF LB UncI Struct Excav CY Channel Excav SCN8i PWN QUANT 310 GE.7 545 560.67 73, 48.81 UNIT PRICE 35.00 0.10 1.50 350.00 SUB TOTAL SC N a PWN AND 485.9 (D., 992 • 2240 10,418 230.75 36_00 0.1C 1_50 0.50 32.00 SUB TOTAL sx SCN a PWN AND 399.05 38.00 6.2635.23 0.10 3391 1_50 6,852 0.50 r. AMOUNT 114164L06 (1c56.07 3 c% 224.72 1, 0s0.00 3, 7 209.224.06 1' OF CHANNEL) 18, 46420' 599.20 3,360.0C 209.00 7, 384.00 OF CHANNEL) 15,163.90 5, 086.50 3, 426.00 SU BIOTA L 29) 959.92 CONTIN GTEONTCCEALS(2%) - 5, 659.93 E -NSGUINBETEORTIANLG 80/0) 236L:1-3,5070C.Cr:°067': TEXAS HIGHWAY DEPARTMENT PFiOJECT I-37-1(23) 006 CONTROL 74-6-57 INTERSTATE HIGHWAY 37 FROM CORN PRODUCTS ROAD TO RAND MORGAN ROAD EXHIBIT CITY STATE JOINT DRAINAGE OUTFALL PROJECT CORPUS CHRISTI TEXAS EXPRESSWAY OFFICE SCALE I 000' DATE AUG 24 1965 SU ER ISIN RESID NT ENGINEER 1 111 1 1 I ■11 III 1 1 I ill,