Loading...
HomeMy WebLinkAbout08115 ORD - 07/27/19667/27/66 AN ORDINANCE RECEIVING AND ACCEPTING CONSTRUCTION OF THE SAVAGE LANE PAILNUA EROSION CONTROL,—FRUJECTM. 230-55-12, PERFORMED bY OR, WOMACK AND MANNING, UNDER TREW CONTRACT 0 , 1967TTUTRUMM BY (146; AUIHOHILINU PAY . T OF FINAL ESTIMATE NO. 8, DATED JULY 1, 19 , N , , A COPY OF WHICH IS ATTACHED HERETO AND AEREREOF, SAID AMOUNT TO BE PAID FROM NO. 230 BRIDGE FUNDS PREVIOUSLY APPROPRIATED, WHICH SUM IS THE AMOUNT DUE THE CONTRACTOR LESS THE RETAINED SUM OF $2,252, OF WHICH $1,125 IS FOR IQUID TED D GES AND ,121 is F R D AGE C AIMED BY SOUTHERN PACIFIC RAILROAD; APPROVING A 13 DAY LXILN51UR OF CONTRACT TIME FOR PROJECT COMPLETION; AND DECLARIN AN EMERGENCY. 1, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, . TEXAS: SECTION 1. THAT THE CONSTRUCTION OF THE SAVAGE LANE RAILROAD EROSION CONTROL, PROJECT NO. 230- 55 -12, AS PERFORMED BY THE CONTRACTOR, WOMACK AND MANNING, UNDER THEIR CONTRACT DATED OCTOBER 13, 1965, AUTHORIZED i BY ORDINANCE NO. 7746, HAVING BEEN PERFORMED AND COMPLETED IN ACCORDANCE WITH THE TERMS AND PROVISIONS OF THE CONTRACT, PLANS IND SPECIFICATIONS THEREIN CONTAINED, EXCEPT AS HEREINAFTER MORE FULLY SET OUT, AND THE DIRECTOR OF PUBLIC WORKS HAVING INSPECTED THE SAME AND CERTIFIED TO THE COMPLETION OF SAID WORK IN ACCORDANCE WITH SAID PLANS AND SPECIFICATIONS, EXCEPT AS HEREINAFTER SET OUT, THE WORK AFORESAID IS HEREBY FOUND TO HAVE BEEN COMPLETED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS, EXCEPT AS HEREINAFTER MORE FULLY SET FORTH, AND IS HERE AND NOW ACCEPTED AND RECEIVED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS. SECTION 2. THAT FINAL PAYMENT IS HEREBY AUTHORIZED AS DUE UNDER THE CONTRACT AND AS SET OUT IN FINAL ESTIMATE N0. 8, ATTACHED HERETO AND MADE A PART HEREOF, PREPARED BY THE DIRECTOR OF PUBLIC WORKS, DATED JULY 1, 1966, IN THE AMOUNT OF $6,764.76, FROM FUNDS PREVIOUSLY APPROPRIATED OUT OF NO. 230 BRIDGE FUNDS, WHICH SUM IS THE AMOUNT DUE THE CONTRACTOR LESS THE RETAINED SUM OF $2,252, OF WHICH $1,125 IS FOR LIQUIDATED DAMAGES AND $1,127 IS FOR DAMAGES CLAIMED BY SOUTHERN PACIFIC RAILROAD. 1 81111 5 SECTION 3. THAT A 13 DAY EXTENSION OF TIME BE AUTHORIZED ON THIS CONTRACT, DUE TO UNUSUAL CIRCUMSTANCES ENCOUNTERED ON THIS PROJECT. SECTION 4. THE NECESSITY FOUR COMPLETION OF SUCH WORK BY SAID ACCEPTANCE AND FINAL PAYMENT IMMEDIATELY CREATES A PUBLIC EMERGENCY AND AN IMPERATIVE PUBLIC NECESSITY REQUIRING THE SUSPENSION OF THE CHARTER RULE THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE OF ITS INTRODUCTION AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE SEVERAL MEETINGS OF THE CITY COUNCIL, AND THE MAYOR, HAVING DECLARED THAT SUCH EMERGENCY AND NECESSITY EXIST, HAVING REQUESTED THAT SUCH CHARTER RULE BE SUSPENDED AND THAT THIS ORDINANCE BE PASSED FINALLY ON THE DATE OF ITS INTRODUCTION AND TAKE EFFECT AND BE IN FULL FORCE AND EFFECT FROM AND AFTER ITS PASSAGE, IT IS ACCORDINGLY SO ORDAINED, THIS THE .J DAY of JULY, 1966. ATTEST: " [_y l OR '/y �� p & �29 � �y THE CITY OF CORPUS CHRISTI, TEXAS CITY SECRETARY ' APPROVED AS TO LEGAL FORM THIS 2 G- DAY OF J LY, 1966: CITY ATTORNEY 0 CITY OF CORPUS CHRISTI, TEXAS DEPARTMENT OF PUBLIC WORKS -- ENGINEERING & CONSTRUCTION DIVISION - CONTRACT MONTHLY ESTIMATE ' PW2 FORM 6 - Project Sayage Lane R.R. Erosion Control :. Est. N 8 & Final Contractor: Womack and Manning Date July 1, 19 Sheet 1 of 1 Item No. on Item Description Unit Proj. Est. Quantities Total Work Done on Cont. Contract Unit Price Amount 1 Excavation S. Y. 21,666 19,398 •3o 5,8i9.4o" 2 Lime Stabilized Base, S.Y. 21,066 19,398 50 9,699.00 3 Prime Coat (MC -70)- Gal. 2106 2,350 .18 423.00 4 Liquid Asphalt QA -175 or 135 Gal. 8,000 7,425 .18 1,336.50 5 Precoated Limestone (Rock Asph) C.Y. 475 485 8.50 4,122.50 6 4" Reinforced C oncrete Riprap S.Y. •750 1,232 3.50' 4,312.00 7 24" Reinforced C oncrete Pipe L.F. 775 775 7.00 5,425.00 8 2411 , Corr. Galy. Metal Pipe Ga., Bit. Coated)'' L.F. 270 i. 246 10.02 2,464.9p- 9 „(16 Special•Manholes'" Each 1 ' ' `- 1. ?1, `. p ' 6 300.00 300.00 10 Ditch Inlets (Special Inlets) Each .j 6 0' 200.00 1,200.00 ll Filling Washes „ L.S. Lump Sum 1, 100, Comp. 9,466.25 9,466.25 *Deduction for Liquidated Dmages 25 days a $45.00 = : $1,12 .00 For Railroad .! Claim 1 12 T. 00 ,25 .00 Certified ' e a�7i Date- 7-2-7 b � Total Work Done 101,56 R sv Correct: • Chief of EriGr. c COnstr. - - - °fa Retained 2,252.90 Appro al 2a—Q Date Amount Payable llo ai G� Recommended: -4 • /wrector of Public Works - - Previous Payments , r Approved: Date Due This Estimate City Manager Estimate Checked GS 7 -1_,__ _4 Date OOTRGN PRINTING CO. RC•ORGCR No' Y901 •- CORPUS CHRISTI, TEXAS -. 9 DAY OF Qu , 192. U d TO THE MEMBERS OF THE CITY COUNCIL CORPUS CHRISTI, TEXAS FOR THE REASONS SET FORTH IN THE EMERGENCY CLAUSE OF THE FORE- GOING ORDINANCE, A PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST FOR THE SUSPENSION OF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE IT IS INTRODUCED AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY COUNCIL; I, THEREFORE, HEREBY REQUEST THAT YOU SUSPEND SAID CHARTER RULE OR REQUIREMENT AND PASS THIS ORDINANCE FINALLY ON THE DATE IT IS INTRO - DUCED, OR AT THE PRESENT MEETING OF THE CITY COUNCIL. RESPECTFULLY, MAYOR THE CITY OF CORPUS CHRISTI, TEXAS THE CHARTER RULE WAS SUSPENDED BY THE FOLLOWING VOTE: DR. MCIVER FURMAN JACK BLACKMON PATRICK J. DONNE (,1 �..0 DR. P. JIMENEZ, JR. KEN MCDANIEL Lc RONNIE SIZEMORE WM. H. WALLACE THE ABOVE ORDINANCE WAS PASSED BY THE FOLLOWING VOTE: DR. MCIVER FURMAN JACK BLACKMON PATRICK J. DUNNE� DR. P. JIMENEZ, JR. KEN MCDANIEL RONNIE SIZEMORE �L Wm. H. WALLACE