HomeMy WebLinkAbout08122 ORD - 08/03/1966JKH:8 -3 -66
AN ORDINANCE
RECEIVING AND ACCEPTING THE CONSTRUCTION OF PALM,
COMANCHE, BLUNTZER, BEACH, PUEBLO AND FIFTEENTH
STREET IMPROVEMENTS, PROJECT NO. 220 -61 -69.9 AND
PUEBLO STORM SEWER, PROJECT NO. 295- 64 -4o.1, AS
PERFORMED BY THE CONTRACTOR, WOMACK AND MANNING,
UNDER THEIR CONTRACT DATED JULY 21, 1965, AUTHORIZED +
BY ORDINANCE NO. 7642; AUTHORIZING PAYMENT OF FINAL
ESTIMATE NO. 12, DATED JULY 28, 1966, IN THE AMOUNT OF
$17,065.89, A COPY OF WHICH IS ATTACHED HERETO AND
MADE A PART HEREOF, SAID AMOUNT TO BE PAID FROM NO. 220
AND NO. 295 STORM SEWER BOND FUNDS PREVIOUSLY APPROPRIATED
AND IS REPRESENTATIVE OF THE AMOUNT DUE THE CONTRACTOR,
LESS THE RETAINED SUM OF $427.00, OF WHICH $350.00 IS
FOR LIQUIDATED DAMAGES AND $77.00 IS FOR DAMAGES CLAIMED
BY ROSE HILL CEMETERY; APPROVING A 45 -DAY EXTENSION OF
CONTRACT TIME FOR PROJECT COMPLETION; AND DECLARING
AN EMERGENCY.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS:
SECTION 1., THAT THE CONSTRUCTION OF THE PALM, COMANCHE, BLUNTZER,
BEACH, PUEBLO AND FIFTEENTH STREET IMPROVEMENTS, PROJECT No. 220 -61 -69.9,
AND PUEBLO STORM SEWER, PROJECT No. 295- 64 -4o.1, AS PERFORMED BY THE CON-
TRACTOR, WOMACK AND MANNING, UNDER THEIR CONTRACT DATED JULY 21, 1965,
AUTHORIZED BY ORDINANCE NO. 7642, HAVING BEEN PERFORMED AND COMPLETED IN
ACCORDANCE WITH THE TERMS AND PROVISIONS OF THE CONTRACT, PLANS AND
SPECIFICATIONS THEREIN CONTAINED, EXCEPT AS HEREINAFTER MORE FULLY SET
OUT, AND THE DIRECTOR OF PUBLIC WORKS HAVING INSPECTED THE SAME AND CERTI-
FIED TO THE COMPLETION OF SAID WORK IN ACCORDANCE WITH SAID PLANS AND
SPECIFICATIOM, EXCEPT AS HEREINAFTER SET OUT, THE WORK AFORESAID IS HEREBY
FOUND TO HAVE BEEN COMPLETED IN ACCORDANCE WITH THE PLANS AND SPECIFICA-
r
TIONS, EXCEPT AS HEREINAFTER MORE FULLY SET FORTH, AND IS HERE AND NOW
ACCEPTED AND RECEIVED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS. s
SECTICN 2. THAT FINAL PAYMENT IS HEREBY AUTHORIZED AS DUE UNDER
THE CONTRACT AND AS SET OUT IN FINAL ESTIMATE N0. 12, ATTACHED HERETO AND
r MADE A PART HEREOF, PREPARED BY THE DIRECTOR OF PUBLIC WORKS, DATED JULY
28, 1966, IN THE AMOUNT OF $17,065.89, FROM FUNDS PREVIOUSLY APPROPRIATED
OUT OF N0.'220 STREET AND NO. 295 STORM SEWER BOND FUNDS, WHICH SUM IS fir;'
THE AMOUNT DUE THE CONTRACTOR LESS THE RETAINED SUM OF $427.00, OF WHICH �a
i
&L2.2
.s
$350.00 IS FOR LIQUIDATED DAMAGES AND $77.00 IS FOR DAMAGES CLAIMED BY
ROSE HILL CEMETERY. 11
SECTION 3. THAT A 45 -DAY EXTENSION OF CONTRACT TIME FOR PROJECT
COMPLETION BE APPROVED AND AUTHORIZED ON THIS CONTRACT, DUE TO UNUSUAL
CIRCUMSTANCES ENCOUNTERED ON THIS PROJECT.
SECTION 4. THE NECESSITY FOR COMPLETION OF SUCH WORK BY SAID
ACCEPTANCE AND FINAL PAYMENT IMMEDIATELY CREATES A PUBLIC EMERGENCY AND
AN IMPERATIVE PUBLIC NECESSITY REQUIRING THE SUSPENSION OF THE CHARTER
RULE THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE
OF ITS INTRODUCTION AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ
AT THREE SEVERAL MEETINGS OF THE CITY COUNCIL, AND THE MAYOR, HAVING
DECLARED THAT SUCH EMERGENCY AND NECESSITY EXIST, HAVING REQUESTED THAT
SUCH CHARTER RULE BE SUSPENDED AND THAT THIS ORDINANCE BE PASSED FINALLY
ON THE DATE OF ITS INTRODUCTION AND TAKE EFFECT AND BE IN FULL FORCE AND
EFFECT FROM AND AFTER ITS PASSAGE, IT IS ACCORDINGLY SO ORDAINED, THIS
THE 1 9 DAY OF AUGUST, 1966.
ATTEST:
UITY SECRETARY V MAYOR _ I"I
APPROVED AS TO LEGAL FORM THIS
THE CITY OF CORPUS CHRISTI, TEXAS
DAY OF AUGUST, 1966:
CITY AT- rORNkY
1p
CITY OF CORPUS CHRISTI, TEXAS
DEPARTMENT OF PUBLIC WORKS -- ENGINEERING & CONSTRUCTION DIVISION
CONTRACT MONTHLY ESTIMATE
• PW'2 FORM 6
Project Comanche, Palm, Bluntzer and Other Street Improvements, Project
220 -61 -69.9 Including Pueblo Storm Sewer Project 295 -64 -40.1 Est. No 12 & F'inal
Contractor: Womack and Manning Date July 28, 1966
Sheet 1 of 2
Item
No.
Item Description
Unit
Proj. Est.
Quantities
Total Work
Done on Cont.
Contract
Unit Price
Amount
STMT ImPIOVEMrS
22o- 61
S.Y.
19,136
1
Street Excavation
17,632
.60
10,579.20
2
Caliche
C.Y.
6,085
5,809
3.25
18,879.25
3
Prime•Coat MC -70
Gal.
2,203
2,228
.18
401.04
4
Liquid Asphalt (OA -175)
Gal.
8,059
7,'805
.18
1,404.90
5
Pre - Coated Limestone Rock
Asphalt Cover Stone
C.Y.
473
477.5
9.25
4,416.87
6
New Curb and Gutter
L.F.
7,434
7,386.3
1.60
11,818.08
7
New Reinforced Concrete Drive-
way
S.F.
9,804
10,264'
.58
5,953.12
8
Concrete Sidewalk
S.F.
26,772
28,445,
.40
11,378.00
9
Reinforced Concrete Pipe, 12"
L.F.
163
156
4:00
624.00
10
Reinforced Concrete Pipe, 15 ".
L.F.
758
682
4.50
3,069.00
Reinforced Concrete Pipe, 18"
L.F.
365`•
379
5.25
11989.75
11 '
Reinforced Concrete Pipe, 24"
Z.F.
202 '
167
6.50
_
1,085:50
16
11 ",x 18K Corr., Gaiv: Metal
Pipe Arch
L.F.
82
82
6.00
492.00
17
For 5' Inlet
Each
10
10
175.00
1,750:00 `
18
For 10' Inlet
Each
3
3
300.00
900.00
19
Adj°atment of Existing 10'
''• `
,'
Inlets (Brick) `_ 'f
Each
1'-
1
g
125.00
125.00
20
R;ypea "A ", Manholes
Each
1
1
'
200.00
200.00.
21
Removing Old Structures
Each
2
2
75.00
150.00
22
Oyster Shell
C.Y.
100
66
2.50
165.00
23
Shell Sidewalk
L.F.
- 34 ".
30
. 1.00
30.00
24
18" Cone. Reader Curb ,; . -'.'
L.F.
- 450'
580
1.40
.
812.00
25
Reinforced Concrete Islands•
S.F.
2,364
2,382
.55
4310,10
26
Cold Mix Asphalt
S.Y.
'80
129
:70
90.30
27
Sidewalk Edge Thickening
L.F.'
122
1,758
.20
351.60
28
Removal of Cone. Islands
S.F.
7,500
7,500
20
1,500.00
Change Order -
(add)
140.00
Change Order 3 -
287 8 'Y' C0140.
Base @ $2.25
645.75
63.7 Tons H
t -Mix ® $9.8o
1
624.26
CITY OF CORPUS CHRISTI, TEXAS
} DEPARTMENT OF PUBLIC WORKS = ENGINEERING & CONSTRUCTION DIVISION
CONTRACT MONTHLY ESTIMATE
1 , PV2 FORM 6 -
Project' Cgmanche, Palm, Bluntzer and Other Street ImproV rents, Project
220-61 -69.9 Including Pueblo Storm Sewer Project 295--6h -40.1 Est. Na 12 & F•dal
'Womack and Manning *
sContractor: Date JLLI y 2$, 1966 '
Sheet 2 of 2
Item
No.
Stem Description �'
Unit
i Proi' Est.
Quantities
Total Work
Done on Cont.
contract
' Unit Price
Amount
/
6'
Change Order
�! -7 6 " Amount Payable 92y946.72
Date .
Director of Public Works
i
Previous Payments 75,880.83
Approved:
457.50
• City Manager
Change Order 5 =
- •
100%r Complete
OOTT)ON PRINTING CO. RL•OROLR NO. !!01 '
600.00
600,00
Sub -Total Work Done
(22o-6L-69.9)
81,942.22:
0 Retained
Amount Payable
81,942.22
Less Previous Payments`
„
65,592-48
Due This Estimate
16,349.74
s IDRM
SEWERS -
95-64 -40.1-
L.F.
16T
10
Reinforced Concrete Pipe, 15"
293. ,
4.50
4318.50
1I
Reinforced Concrete Pipe, 18"
L.F.
127
136
5.25
714.00 -
12
Reinforced Concrete Pipe, 21 ".
L.F.
744 '
740
:6.00
4,440.00
14
Reinforced Concrete Pipe, 27"
L.P.
28
30
8.00
240.00
15
Reinforced Concrete.Pipe, 30"
LI'F.
,216
216
9.00
1,944.00
17
For 5' Inlet
Each
9
9
175.00
1,575.00
20
Type "A" Manholes
Eacli
6
6
200.00
1,200.00
-Sub Total Work Done 095 -64-
0.1)
11,431.50
0 Retained
-0-
Amount Payable
11,431.50
Less Previous Payments
10,288.35
Due This Estimate
11143.15
s 1. C1Rim frem Rose Rill Ceme
terry+ 1
amount of
77.00
2. Liquidated Damages
50.00
•
$
7.00,
.
Certified
�_ `_' Total Work Done
Correct:
Date 6 -
• Chief 61 Engr. & Constr. --
ih C/o Retained _ 4P7 -oc)
/
6'
APPro `
' Recommended: l
�! -7 6 " Amount Payable 92y946.72
Date .
Director of Public Works
i
Previous Payments 75,880.83
Approved:
Date Due This Estimate 1 89
• City Manager
- •
Estimate Checked GS 7 -29 -66 Date
OOTT)ON PRINTING CO. RL•OROLR NO. !!01 '
p , ,
d
CITY OF CORPUS CHRISTI - CONTRACT TIME STATEMENT
Estimate No. 12 Dated_ 7'17 19 Contractor Wc=.ck arid Mantdng
Project Pueblo Street Improvement Time Started 19—
Date Work Began March 21 19 66 Date Work Completed 7– �5 19 AL
Amount of Contract $ 93,436.13 Amount of Liquidated Damages Per Day $ 30.00
Month
Dot.
r
D.yr
W.rk.g
Deyr
Charged
'
, D.y. Not Charg.d and Bnrons Therefor
JULY
1
1
2
1
-
3
0
Sun.
4
0
HoU
5
1
6
1
7
1
8
9
sat,
_
to
0
Sun
11
]
12
1
13
0
Rain
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
r f
30
F c
31
snh r.�1
P—i— Tnt.1
Tot.1 t. D.I.
No. contract working days_ plus Q days extensions. No. working days used to date— )12
No. days overrun 12 . Amount of liquidated damages $ 160 00 Remark.
Certified as correct, with one copy to contractor. l
�Y Jesus M. Cantu ���
�.• Prepared By APProred Y QV Egl—
3.,
34 56
AU 1U6
FINAL AFFIDAVIT ON PROJECTS
Pu3lt3 vdc. "Ks t
FOR CITY OF CORPUS CHRISTI 81 Lly�
STATE OF TEYAS
COUHTi OF NUECES
T, Jack ilomaak
hereby ceRM that Met 6-f AV kDW3.edgo and belief
conditions, including payment of Minim! Wage Rates, specified its
Contract with the City of Corpus Christi, Texas, for construction of
Street Improvents on Comanche Palm Bluntser, and other streets
Imave-bean compUed and &U bin imurrOd on this PrOJ80t, have been
paid in full by Womack and
SigLa3
Title Owner
r
Sworn to before me 'this '1st Y day of .A August
Nueess s NoUry' Public
o yo ex" y a'
r
CORPUS CHRISTI, TEXAS
.� DAY OF
TO THE MEMBERS OF THE CITY COUNCIL
CORPUS CHRISTI, TEXAS
FOR THE REASONS SET FORTH IN THE EMERGENCY CLAUSE OF THE FORE-
GOING ORDINANCE, A PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST FOR
THE SUSPENSION OF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE OR
RESOLUTION SHALL BE PASSED FINALLY ON THE DATE IT IS INTRODUCED, AND THAT
SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY
COUNCIL; I, THEREFORE, HEREBY REQUEST THAT YOU SUSPEND SAID CHARTER RULE
OR REQUIREMENT AND PASS THIS ORDINANCE FINALLY ON THE DATE IT IS INTRO -
DUCED, OR AT THE PRESENT MEETING OF THE CITY COUNCIL.
RESPECTFULLY,
j OR T.
THE CITY OF CORPUS CHRISTI, TEXAS
THE CHARTER RULE WAS SUSPENDED BY THE FOLLOWING VOTE:
DR. MCIVER FURMAN
JACK BLACKMON lY.c
PATRICK J. DUNNE
DR. P. JIMENEZ, JR.
KEN MCDANIEL
R ONNIE SIZEMORE T
f
WM. H. WALLACE
THE ABOVE ORDINANCE WAS PASSED BY THE FOLLOWING VOTE:
DR. MCIVER FURMAN
JACK BLACKMON
r �-
PATRICK J. DONNE
DR. P. JIMENEZ, JR.�
KEN MCDANIEL
RONNIE SIZEMORE �� O
WM. H. WALLACE _ (�•�,p,