HomeMy WebLinkAbout08259 ORD - 12/07/1966• 12/7/66 • AN ORDINANCE ACCEPTING CONSTRUCTION OF THE SOUTH STAPLES STREET IMPROVEMENTS, GOLLIHAR TO PADRE ISLAND DRIVE, PROJECT NO. 220- 56 -29, AS PERFORMED BY THE CONTRACTOR, SOUTH TEXAS CONSTRUCTION COMPANY, UNDER THEIR CONTRACT DATED FEBRUARY 2, 1966, AUTHORIZED BY ORDINANCE NO. 7893; AUTHORIZING PAYMENT OF FINAL ESTIMATE N0. 8 DATED NOVEMBER 30, 1966, IN THE AMOUNT OF $27,206.33, A COPY OF WHICH IS ATTACHED HERETO AND MADE A PART HEREOF, SAID PAYMENT TO BE MADE FROM NO. 220 STREET BOND FUNDS PREVIOUSLY APPROPRIATED FOR CONSTRUCTION AND CONTINGENCIES; AND DECLARING AN EMERGENCY. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS; SECTION 1. THAT THE CONSTRUCTION OF THE SOUTH STAPLES STREET IMPROVEMENTS, PROJECT N0. 220- 56 -29, AS PERFORMED BY THE CONTRACTOR, SOUTH TEXAS CONSTRUCTION COMPANY, UNDER THEIR CONTRACT DATED FEBRUARY 21 1966, AUTHORIZED BY ORDINANCE N0. 7893, HAVING BEEN PERFORMED AND COMPLETED IN ACCORDANCE WITH THE TERMS AND PROVISIONS OF THE CONTRACT, PLANS AND SPECIFI- CATIONS THEREIN CONTAINED, AND THE DIRECTOR OF PUBLIC WORKS HAVING INSPECTED THE SAME AND CERTIFIED TO THE COMPLETION OF SAID WORK IN ACCORDANCE WITH SAID PLANS AND SPECIFICATIONS, THE WORK AFORESAID IS HEREBY FOUND TO HAVE BEEN COMPLETED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND IS HERE AND NOW ACCEPTED AND RECEIVED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS. SECTION 2. THAT FINAL PAYMENT DUE UNDER THE CONTRACT AND AS SET OUT IN FINAL ESTIMATE NO. 8, DATED NOVEMBER 30, 1966, ATTACHED HERETO AND MADE A PART HEREOF, PREPARED BY THE DIRECTOR OF PUBLIC WORKS, IN THE AMOUNT OF 27,206.33, OUT OF N0. 220 STREET BOND FUNDS PREVIOUSLY APPROPRIATED, IS HEREBY AUTHORIZED. SECTION 3. THE NECESSITY FOR COMPLETION OF SUCH WORK BY SAID ACCEPTANCE AND FINAL PAYMENT IMMEDIATELY CREATES A PUBLIC EMERGENCY AND AN IMPERATIVE PUBLIC NECESSITY REQUIRING THE SUSPENSION OF THE CHARTER RULE THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE OF ITS INTRODUCTION AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE 8259 SEVERAL MEETINGS OF THE CITY COUNCIL, AND THE MAYOR, HAVING DECLARED THAT SUCH PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST, AND HAVING REQUESTED THAT SUCH CHARTER RULE BE SUSPENDED AND THAT THIS ORDINANCE BE PASSED FINALLY ON THE DATE OF ITS INTRODUCTION AND TAKE EFFECT AND BE IN FULL FORCE AND EFFECT FROM AND AFTER ITS PASSAGE, IT IS ACCORDINGLY SO ORDAINED, THIS THE - DAY OF DECEMBER, 1966. ATTEST: //-], /'-, , - , CIT SkCVETXRY MAYOR THE CITY OF CORPUS CHRISTI, TEXAS APPROVED AS TO LEGAL FORM THIS 7 DAY OF DECEMBER, 1966: I C CITY ATT NEY C CITY OF CORPUS CHRISTI, TEXAS DEPARTMENT OF PUBLIC WORKS -- ENGINEERING & CONSTRUCTION DIVISION CONTRACT MONTHLY ESTIMATE n South Staples Street Improvements - Gollihar Road to 8 &Final Project Lexington Boulevard Est. N V1 ug66 Contractor: South Texas Construction Co. 78415 Date er Sheet 1 O P 0 Box 7378 Corwus Christi Texas Pro'. Est Contract Unit Price �� Item Item Desertption Unit Quentittes Done�on Cont. t Excavation S.Y. 56,316 12,269 58,505 11,068 .65 3.00 38,028.25 33,204.00 ble Same, Caliche C.Y. 1 (1. 9,742 9,510 .16 1,521•6O 23,411.E Coat iC - urb and Gutter 6" std. L.F. �+' 13,800 28,820 13,771• 4 27,593.9 1.70 44 12,141.32 eta. B.F. ete Sidewalk, Big• 20,5 20,044.8 .80 16,035.84 9,4.00 ete Driveways nlets Each i+8 5 p S 180.00 50.00 Each ts to be Removed L.F. Concrete Pipe, 15" 6 1,676 1,750 7.30 14.00 12,775.00 868.00 12 13 Reinforced Ra9nforce8 Concrete Pipes 18" L.F. 54 16 150,00 2,400.00 14 Manholes to be completed Each 13 3,030 3'030 .10 303.00 15 R�orking Access Roads S.Y. 1 3 350.00 1,050.00 16 Type "A" Manhole Each 75.80 17 Sidewalk Edge Thickening on L.F. 890 758 .10 18 5.5' Sidewalk Reinforced Concrete sidewalk 5,054 3,665.3 •46 1,686.04 (5.5'x4' Tied) B.F. 19 Reinforced Concrete Islands, B.F. 2,000 5, 7990 ,50 2,899.50 20 4' Thick Converting Inlets to Junction Sash 65•0D 195.00 20,649.58 21 Boxes 6 " Lima stabilized Base 54,436 54,341 .38 2< Re- Laying 48" R.C. Pipe, lao 177 8.60 1,$'22.20 4A Storm sewer L.F. Type "D" Hot-mix Asphaltic 3,950 4,007.3 5.80 230242.34 Concrete Agg. (8HE'i.L) Ton 5A Type "A" Hot -mix Asphaltic Ton Concrete Agg. (SHELL) 5,581 5,792.6 5.80 33,597.08 6A Liquid Asphalt (OA -90) with Ton 764 764 .1 0 21,012.75 3i784.3C Shell Agg. C.Y. 1,800 2,9 u 1.30 23 Salvaged Caliche Base 945.00 945.00 Extra Work 100% Complete Change Order No. 1 Certified %� '� Total Work Done " z _ LI Correct: DatP ' u " "" c/o Retained (� �- Amount Payable — c9; +'— Approval Date Recommended: Previous Payments Director of Public orks , Due This Estimate Date Approved: r-,.., nrtanaaer CITY OF CORPUS CHRISTI - CONTRACT TIME STATEMENT Estimate No. 8 Dated Roomier Ig 66 Contractor South Tema Construction Co Project- South Staples reet rovements Time Started April 11 66 — uoj.umr Rd. to St Le3dngton 8144. 19 Date Work Began AP191 11 19 2�L– Date Work Completed November 8. 1966 19_ Amount of Contract $ 257.528.04 Amount of Liquidated Damages Per Day $ m..m Does 'ki.s D °y Oureed Dale Not Ch.m d and ae..— Therefor 1504, 1 2 3 1 4 l 5 Sat. 6 Sun. 7 1 R 1 9 10 11 12 13 14 15 16 17 18 19 20 21 23 24 25 26 27 28 29 30 31 S.b Tore) T T-1 Torel to D.ie " No. contract working days 750 plus____0__days extensions. No. working days used to date lly2 _ No. days overrun p . Amount of liquidated damages $______ —. Remarks FUM1 !AMO Stetemmt Work GwVleted November 9, 1966 Certified as correct, with one copy to contractor. �_ L _ _ South Texas Construction Co. CONTRACTOR'S AFFIDAVIT OF BILLS PAID STA'T'E: Ue 'fEXA rOUM OF NUECES Peruonally, neiorn. ri the undersigned authority, on this day appeared LLWI..,0'r +=:;, who, I—Ang ruly sworn, on oath, r-!yc that he is a legal representative of SOUTH TEXAS CONSTRUMON CO. and that the contract for the construction of SOUTH PTAFIX -77 STRE T DIMVFM -"M 'lae bean satisfactorily compiete2 and that all bills for materials, apparatus, fixtures, machin�,-y and labor L-c" in connection with the construction of this pro-,t have, to the best of my knowledge and belief, been fully raid, 1M;1S JOITFS :LICE- PRE.SDU Sworn to and subscribed before me this 28th day of " a•embc: 1966. 1 i J j Afotaty Public is and for Puecas caouitty, Texas I• • CORPUS CHRISTI, TEXAS DAY OF _� 19 TO THE MEMBERS OF THE CITY COUNCIL CORPUS CHRISTI, TEXAS FOR THE REASONS SET FORTH IN THE EMERGENCY CLAUSE OF THE FORE- GOING ORDINANCE, A PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST FOR THE SUSPENSION OF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE IT IS INTRODUCED, AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY COUNCILS I, THEREFORE, HEREBY REQUEST THAT YOU SUSPEND SAID CHARTER RULE OR REQUIREMENT AND PASS THIS ORDINANCE FINALLY ON THE DATE IT IS INTRO- DUCED, OR AT THE PRESENT MEETING OF THE CITY COUNCIL. RESPECTFULLY, MAYOR' THE CITY OF CORPUS CHRISTI, TEXAS THE CHARTER RULE WAS SUSPENDED BY THE FOLLOWING VOTE: DR. MCIVER FURMAN JACK BLACKMON qq,� PATRICK J, DUNNE DR. P. JIMENEZ, JR, KEN MCDANIEL BONNIE SIZEMORE WM. H. WALLACE THE ABOVE ORDINANCE WAS PASSED BY THE FOLLOWING VOTE: DR. MCIVER FURMAN JACK BLACKMON PATRICK J. DUNNE DR. P. JIMENEZ, JR, TEEN MCDANIEL RONNIE SIZEMORE WM. H. WALLACE