HomeMy WebLinkAbout08259 ORD - 12/07/1966• 12/7/66 •
AN ORDINANCE
ACCEPTING CONSTRUCTION OF THE SOUTH STAPLES STREET
IMPROVEMENTS, GOLLIHAR TO PADRE ISLAND DRIVE,
PROJECT NO. 220- 56 -29, AS PERFORMED BY THE CONTRACTOR,
SOUTH TEXAS CONSTRUCTION COMPANY, UNDER THEIR CONTRACT
DATED FEBRUARY 2, 1966, AUTHORIZED BY ORDINANCE NO. 7893;
AUTHORIZING PAYMENT OF FINAL ESTIMATE N0. 8 DATED NOVEMBER
30, 1966, IN THE AMOUNT OF $27,206.33, A COPY OF WHICH IS
ATTACHED HERETO AND MADE A PART HEREOF, SAID PAYMENT TO BE
MADE FROM NO. 220 STREET BOND FUNDS PREVIOUSLY APPROPRIATED
FOR CONSTRUCTION AND CONTINGENCIES; AND DECLARING AN EMERGENCY.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS;
SECTION 1. THAT THE CONSTRUCTION OF THE SOUTH STAPLES STREET
IMPROVEMENTS, PROJECT N0. 220- 56 -29, AS PERFORMED BY THE CONTRACTOR, SOUTH
TEXAS CONSTRUCTION COMPANY, UNDER THEIR CONTRACT DATED FEBRUARY 21 1966,
AUTHORIZED BY ORDINANCE N0. 7893, HAVING BEEN PERFORMED AND COMPLETED IN
ACCORDANCE WITH THE TERMS AND PROVISIONS OF THE CONTRACT, PLANS AND SPECIFI-
CATIONS THEREIN CONTAINED, AND THE DIRECTOR OF PUBLIC WORKS HAVING INSPECTED
THE SAME AND CERTIFIED TO THE COMPLETION OF SAID WORK IN ACCORDANCE WITH SAID
PLANS AND SPECIFICATIONS, THE WORK AFORESAID IS HEREBY FOUND TO HAVE BEEN
COMPLETED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS AND IS HERE AND
NOW ACCEPTED AND RECEIVED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS.
SECTION 2. THAT FINAL PAYMENT DUE UNDER THE CONTRACT AND AS SET
OUT IN FINAL ESTIMATE NO. 8, DATED NOVEMBER 30, 1966, ATTACHED HERETO AND
MADE A PART HEREOF, PREPARED BY THE DIRECTOR OF PUBLIC WORKS, IN THE AMOUNT
OF 27,206.33, OUT OF N0. 220 STREET BOND FUNDS PREVIOUSLY APPROPRIATED, IS
HEREBY AUTHORIZED.
SECTION 3. THE NECESSITY FOR COMPLETION OF SUCH WORK BY SAID
ACCEPTANCE AND FINAL PAYMENT IMMEDIATELY CREATES A PUBLIC EMERGENCY AND AN
IMPERATIVE PUBLIC NECESSITY REQUIRING THE SUSPENSION OF THE CHARTER RULE
THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE OF ITS
INTRODUCTION AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE
8259
SEVERAL MEETINGS OF THE CITY COUNCIL, AND THE MAYOR, HAVING DECLARED THAT
SUCH PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST, AND HAVING REQUESTED
THAT SUCH CHARTER RULE BE SUSPENDED AND THAT THIS ORDINANCE BE PASSED
FINALLY ON THE DATE OF ITS INTRODUCTION AND TAKE EFFECT AND BE IN FULL
FORCE AND EFFECT FROM AND AFTER ITS PASSAGE, IT IS ACCORDINGLY SO ORDAINED,
THIS THE - DAY OF DECEMBER, 1966.
ATTEST:
//-], /'-, , - ,
CIT SkCVETXRY MAYOR
THE CITY OF CORPUS CHRISTI, TEXAS
APPROVED AS TO LEGAL FORM THIS
7 DAY OF DECEMBER, 1966:
I C
CITY ATT NEY
C
CITY OF CORPUS CHRISTI, TEXAS
DEPARTMENT OF PUBLIC WORKS --
ENGINEERING
& CONSTRUCTION DIVISION
CONTRACT MONTHLY ESTIMATE
n
South Staples Street Improvements - Gollihar Road to
8 &Final
Project
Lexington Boulevard
Est. N
V1 ug66
Contractor: South Texas Construction Co.
78415
Date er
Sheet 1 O
P 0 Box 7378 Corwus Christi Texas
Pro'. Est
Contract
Unit Price
��
Item
Item Desertption Unit
Quentittes
Done�on Cont.
t Excavation S.Y.
56,316
12,269
58,505
11,068
.65
3.00
38,028.25
33,204.00
ble Same, Caliche C.Y.
1 (1.
9,742
9,510
.16
1,521•6O
23,411.E
Coat iC -
urb and Gutter 6" std. L.F.
�+'
13,800
28,820
13,771• 4
27,593.9
1.70
44
12,141.32
eta. B.F.
ete Sidewalk, Big•
20,5
20,044.8
.80
16,035.84
9,4.00
ete Driveways
nlets Each
i+8
5 p
S
180.00
50.00
Each
ts to be Removed L.F.
Concrete Pipe, 15"
6
1,676
1,750
7.30
14.00
12,775.00
868.00
12
13
Reinforced
Ra9nforce8 Concrete Pipes 18" L.F.
54
16
150,00
2,400.00
14
Manholes to be completed Each
13
3,030
3'030
.10
303.00
15
R�orking Access Roads S.Y.
1
3
350.00
1,050.00
16
Type "A" Manhole Each
75.80
17
Sidewalk Edge Thickening on
L.F.
890
758
.10
18
5.5' Sidewalk
Reinforced Concrete sidewalk
5,054
3,665.3
•46
1,686.04
(5.5'x4' Tied) B.F.
19
Reinforced Concrete Islands,
B.F.
2,000
5, 7990
,50
2,899.50
20
4' Thick
Converting Inlets to Junction
Sash
65•0D
195.00
20,649.58
21
Boxes
6 " Lima stabilized Base
54,436
54,341
.38
2<
Re- Laying 48" R.C. Pipe,
lao
177
8.60
1,$'22.20
4A
Storm sewer L.F.
Type "D" Hot-mix Asphaltic
3,950
4,007.3
5.80
230242.34
Concrete Agg. (8HE'i.L) Ton
5A
Type "A" Hot -mix Asphaltic Ton
Concrete Agg. (SHELL)
5,581
5,792.6
5.80
33,597.08
6A
Liquid Asphalt (OA -90) with
Ton
764
764 .1
0
21,012.75
3i784.3C
Shell Agg.
C.Y.
1,800
2,9 u
1.30
23
Salvaged Caliche Base
945.00
945.00
Extra Work
100% Complete
Change Order No. 1
Certified
%� '�
Total Work Done
" z _ LI
Correct:
DatP
' u " ""
c/o Retained
(� �-
Amount Payable — c9;
+'—
Approval Date
Recommended:
Previous Payments
Director of Public orks
,
Due This Estimate
Date
Approved: r-,.., nrtanaaer
CITY OF CORPUS CHRISTI - CONTRACT TIME STATEMENT
Estimate No. 8 Dated Roomier Ig 66 Contractor South Tema Construction Co
Project- South Staples reet rovements Time Started April 11 66 —
uoj.umr Rd. to St Le3dngton 8144. 19
Date Work Began AP191 11 19 2�L– Date Work Completed November 8. 1966 19_
Amount of Contract $ 257.528.04 Amount of Liquidated Damages Per Day $
m..m
Does
'ki.s
D °y
Oureed
Dale Not Ch.m d and ae..— Therefor
1504,
1
2
3
1
4
l
5
Sat.
6
Sun.
7
1
R
1
9
10
11
12
13
14
15
16
17
18
19
20
21
23
24
25
26
27
28
29
30
31
S.b Tore)
T
T-1
Torel to D.ie "
No. contract working days 750 plus____0__days extensions. No. working days used to date lly2 _
No. days overrun p . Amount of liquidated damages $______ —. Remarks
FUM1 !AMO Stetemmt Work GwVleted
November 9, 1966
Certified as correct, with one copy to contractor. �_ L _ _
South Texas Construction Co.
CONTRACTOR'S AFFIDAVIT OF BILLS PAID
STA'T'E: Ue 'fEXA
rOUM OF NUECES
Peruonally, neiorn. ri the undersigned authority, on this day
appeared LLWI..,0'r +=:;, who, I—Ang ruly sworn, on oath, r-!yc that
he is a legal representative of SOUTH TEXAS CONSTRUMON CO. and
that the contract for the construction of SOUTH PTAFIX -77 STRE T
DIMVFM -"M 'lae bean satisfactorily compiete2 and that all bills
for materials, apparatus, fixtures, machin�,-y and labor L-c" in
connection with the construction of this pro-,t have, to the best
of my knowledge and belief, been fully raid,
1M;1S JOITFS
:LICE- PRE.SDU
Sworn to and subscribed before me this 28th day of " a•embc: 1966.
1
i
J j
Afotaty Public is and for
Puecas caouitty, Texas
I• •
CORPUS CHRISTI, TEXAS
DAY OF _� 19
TO THE MEMBERS OF THE CITY COUNCIL
CORPUS CHRISTI, TEXAS
FOR THE REASONS SET FORTH IN THE EMERGENCY CLAUSE OF THE FORE-
GOING ORDINANCE, A PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST FOR
THE SUSPENSION OF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE OR
RESOLUTION SHALL BE PASSED FINALLY ON THE DATE IT IS INTRODUCED, AND THAT
SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY
COUNCILS I, THEREFORE, HEREBY REQUEST THAT YOU SUSPEND SAID CHARTER RULE
OR REQUIREMENT AND PASS THIS ORDINANCE FINALLY ON THE DATE IT IS INTRO-
DUCED, OR AT THE PRESENT MEETING OF THE CITY COUNCIL.
RESPECTFULLY,
MAYOR'
THE CITY OF CORPUS CHRISTI, TEXAS
THE CHARTER RULE WAS SUSPENDED BY THE FOLLOWING VOTE:
DR. MCIVER FURMAN
JACK BLACKMON qq,�
PATRICK J, DUNNE
DR. P. JIMENEZ, JR,
KEN MCDANIEL
BONNIE SIZEMORE
WM. H. WALLACE
THE ABOVE ORDINANCE WAS PASSED BY THE FOLLOWING VOTE:
DR. MCIVER FURMAN
JACK BLACKMON
PATRICK J. DUNNE
DR. P. JIMENEZ, JR,
TEEN MCDANIEL
RONNIE SIZEMORE
WM. H. WALLACE