HomeMy WebLinkAbout09122 ORD - 11/20/196811- 18- 68:FMB
•
AN ORDINANCE
RECEIVING AND ACCEPTING CONSTRUCTION OF THE EVERHART
ROAD IMPROVEMENTS, FROM PADRE ISLAND DRIVE TO HOLLY
ROAD, PROJECT NO. 220- 67 -89, AS PERFORMED BY THE CON-
TRACTOR, HELDENFELS BROTHERS, UNDER THEIR CONTRACT
DATED MARCH 20, 1968, AUTHORIZED BY ORDINANCE NO. 8803;
AUTHORIZING PAYMENT OF FINAL ESTIMATE NO. 3 DATED
NOVEMBER 1, 1968, IN THE AMOUNT OF $56,220.48, A COPY
OF WHICH IS ATTACHED HERETO AND MADE A PART HEREOF,
SAID PAYMENT TO BE MADE FROM NO. 220 STREET FUNDS
PREVIOUSLY APPROPRIATED FOR CONSTRUCTION AND CONTIN-
GENCIES; AND DECLARING AN EMERGENCY.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS:
SECTION 1. THAT THE CONSTRUCTION OF THE EVERHART ROAD IMPROVE-
MENTS, FROM PADRE ISLAND DRIVE TO HOLLY ROAD, PROJECT N0. 22o- 67 -89, AS
PERFORMED BY THE CONTRACTOR, HELDENFELS BROTHERS, UNDER THEIR CONTRACT
DATED MARCH 20, 1968, AUTHORIZED BY ORDINANCE N0. 8803, HAVING BEEN PER-
FORMED AND COMPLETED IN ACCORDANCE WITH THE TERMS AND PROVISIONS OF THE
CONTRACT, PLANS AND SPECIFICATIONS THEREIN CONTAINED, AND THE DIRECTOR OF
PUBLIC WORKS HAVING INSPECTED THE SAME AND CERTIFIED TO THE COMPLETION
OF SAID WORK IN ACCORDANCE WITH SAID PLANS AND SPECIFICATIONS, THE WORK
AFORESAID IS HEREBY FOUND TO HAVE BEEN COMPLETED IN ACCORDANCE WITH THE
PLANS AND SPECIFICATIONS, AND IS HERE AND NOW ACCEPTED AND RECEIVED BY
THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS.
SECTION 2. THAT FINAL PAYMENT IS HEREBY AUTHORIZED AS DUE UNDER
THE CONTRACT AND AS SET OUT IN FINAL ESTIMATE N0. 3, DATED NOVEMBER 1, 19681
ATTACHED HERETO AND MADE A PART 1H EREOF, PREPARED BY THE DIRECTOR OF PUBLIC
WORKS, IN THE AMOUNT OF $56,220.48, FROM FUNDS PREVIOUSLY APPROPRIATED OUT
OF NO. 220 STREET BOND FUND.
SECTION 3. THE NECESSITY FOR COMPLETION OF SUCH WORK BY SAID
ACCEPTANCE AND FINAL PAYMENT IMMEDIATELY CREATES A PUBLIC EMERGENCY AND
AN IMPERATIVE PUBLIC NECESSITY REQUIRING THE SUSPENSION OF THE CHARTER
RULE THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE
OF ITS INTRODUCTION AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT
9 122'
`j CITY OF CORPUS CHRISTI, TEXAS
DEPARTMENT OF PUBLIC WORKS - ENGINEERING & CONSTRUCTION DIVISION
CONTRACT MONTHLY ESTIMATE
P9r'2 FORM -6
Project FVFRHART ROAD IMPRIIVFMFNTSB PAnRF IS H. n 1.10 1 Y R6]
Pro.iect No. 220 -67 -89 Est No 3 (FINAL)
Contractor: HELDENFELS BROS.. Date 1 November 1968
P.O. Box 1917, Corpus Christi, Texas 78403 Sheet of
Item
No.
Item Description -
Unit
Proi. Eat.
Quantities
Total Work
Done on Cont.
Contract
Unit Price
Amomt
A.
Street;Reconstruction
0 % Retained - - - 1
Approv
1J -1 .3 _�f
1.
Street Excavation
S.Y.
26,462
29,168
.80
23,334.40
2.
6" Lime Stabilized Base
S.Y.
26,462
26,314
.55
14,472.70
3.
Flexible Base, Caliche
C.Y.
7,382
6,885
3.30
22,720.50
4.
Prime Coat, MC -1
Gal.
3,525
4,051
.22
891.22
5.
Type "D" Asphaltic Coln.
Ton
2,174
2,146.
8.95
19,207.60
6.
Liquid Asphalt (OA -90)
Ton
176
161.
8.95
1,444.53
7.
6" Curb & Gutter
L.F.
7,767
7,770.
5 1.80
13,987.53
8.
4"x5'= 0 "Reinf.Conc.S',Walk
S.F.
34,128
32,712.18
.50
16,356.09
9.
Concrete Driveways
S.F.
3,157
5.858.1)3
.80
4,686.42
10.
5' Standard Inlets
Ea.
9
9
210.00
1,890.00
11.
5' Special Inlets
Ea.
10
10
210.00
2,100.00
12.
15" R.C.P.
L.F.
394
388
5.20
2,017.60
13.
18" R.C.P.
L.F.
199
186
6.00
1,116.0
14.
24" R.C.P.
L.F.
2,234
2,216
7.25
16,066.00
15.
27" R.C.P.
L.F.
618
618
8.00
4,944.00
16.
30" R.C.P.
L.F.
85
85
9.30
790.50
17.
Corr.Metal Pipe(22 "xl3 ")
L.F.
43
43
7.10
305.30
18.
" " " 29 "x18"
L.F.
364
364
9.90
3,603.60
19.
Type A. Manholes
Ea.
13
13
250.00
3,250.00
20.
Shallow Manholes
Ea.
6
6
225.00
1,350.00
21.
Conn.to Exist,M'Holes(San.)Ea.
2
2
50.00
100.0
22.
" a n " (Storm)
Ea.
2
2
300.00
600.00
23.
8" Vit. Clay Pipe
L.F.
94
90
5.00_
450.00
24.
Sanitary Manholes
Ea.
2
2
250.00
500.00
25.
Remove Exist.Timb.Dridge
L.S.
1
1
350.00
350.00
26.
Barricade
Ea.
1
0
175.00
- J -
27.
Salvage Caliche Base
C.Y.
1,430
1,372
1.50
2,058.0
28
Shell Driveways 8 S.W.
C.Y.
52
0
4.75
- 0 -
29.
Remove Conc. Box Culvert
Ea.
2
2
750.00
1,500.0
B.
Lowering Railroad
1.
Excavation
C.Y.
- 273
213
2.25
479.2
2.
Prep.of Subgrade,10 "Lime
S.Y.
805
778
1.25
972.5
Stabilized
riinnnp
Certified y
161,903.74
Correct: �'
G +�
Date / -�� - ��
Total Work Done
Chies . & Constr.
0 % Retained - - - 1
Approv
1J -1 .3 _�f
Amount Payable 161,903.74
Recom ended:
Date
ector of Public Works
105 6b3.26
Previous Payments ,
Approved:
Date
-
Due This Estimate 566,220.48
City Manager -.
- - -
-
I
Estimate Checke A ate
.ggT"qN PRINT Riq L0. RL•gRLLR N0. ,Bql
�18 •
CITY OF CORPUS CHRISTI - CONTRACT TIME STATEMENT
Estimate No -3 Dot�1 November i98 contractor HELDENFELS BROS.
Prvjcr+ EVERHART RD..PADRE IS.DR.tEo HOLLY RD, Time Started July 23 1968
Date Work Eagan JUIy 23 19 6S Date Work Completed November 1 19 68
Amount of Contract $ 160.842. 70 Amount of Liquidated Damages Per Day $
M—h
Dom
working
Coed
Day. NHS Charged and Reasons Tkarefm
ovembor
1
2,
3
4
5
6
S
9
10
ti
12
13
14
15
16
17
is
19
20
21
22
23
24'
25
26
27
28
29
30
31
snh Tema
T-1 to Dem
64
jb
No. contract working days 120 plus 0 days extensions. No. working days used to date 04
No. days overrun 0 Amount of liquidated damages $ '`0" Remarks
as correct, with one copy to contractor. .
P+El—a By -
MUNROE A BASS
�I6 •
CITY OF CORPUS CHRISTI — CONTRACT TIME STATEMENT
Estimate No 3 Dated October 1968' Contractor HELDEPBFEL BROS.
Protect EVERHART RD. PADRE ISLAND DR.tO HOLLY RQ'ime Started MY 23 1960
Date Work Beg;,, JU1Y 23 1968 Date Work Completed 19_
Amount of Contracts 160,8442.70 Amount of Liquidated Damages Per Day $
No. contract working days 1 h t5 plus 0 days extensions. No. working days used to date 63
No. days overran -0— Amount of liquidated damages $ -- -- —. Rem s
as correct, wIIn one copy
Prepared By ADI ed 1
MUNROE & BASS
4.. 0 0
MONTHLY AFFIDAVIT ON PROJECTS
FOR CITY OF CORPUS CHRISTI
STATE OF TEXAS
COUNTY OF NUECES G
I H. C. Heldenfels
hereby certify that to the best of my knowledge and belief
all conditions, including payment of Minimum Wage Rates,
specified in Contract with the City of Corpus Christi, Texas
for Cpnetr r K000 p£ aTreat improvements - Noijy Koad to ou
Padre Island Drive
have been complied with by Heldenfels Brothers for the month
of October 19 68
Signed�'�Z
Title Partner
�SSw'orJnOto before me this day of November 19 68.
v"�A Notary Public, Nueces County, Texas.
VIOLA TEEL
Notary Public, In and for Nueces county, Texas
,. ;y Commission Expires June 1, 19110
TO THE MEMBERS OF THE CITY COUNCIL
CORPUS CHRISTI, TEXAS
CORPUS CHRISTI, TEXAS (�
DAY OFL�Q�
. FOR THE REASONS SET FORTH IN THE EMERGENCY CLAUSE OF THE FOREGOING
ORDINANCES A PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST FOR THE SUSPEN-
SION OF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE OR RESOLUTION SHALL
BE PASSED FINALLY ON THE DATE IT IS INTRODUCED, AND THAT SUCH ORDINANCE OR
RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY COUNCILS I, THEREFORE
REQUEST THAT YOU SUSPEND SAID CHARTER RULE OR REQUIREMENT AND PASS THIS ORDI-
NANCE FINALLY ON THE DATE IT IS INTRODUCED OR AT THE PRESENT MEETING OF THE
CITY COUNCIL.
RESPECTFULLY
J�
R
THE CITY OF CORPUS CHRISTI, TEXAS
THE CHARTER RULE WAS S SPEN ,I BY THE FOLLOWING VOTE:
JACK R. BLACKMON
RONNIE SIZEMORE
V. A. "DICK" BRADLEY JR.
el
P. JIMENEZ, JR., M.D.
GABE LOZANO, SR.
KEN MCDANIEL
W. J. "WRANGLER" ROBERTS
THE ABOVE ORDINANCE WAS PASSED BY THE FOLLOWING VOTE:
JACK R. BLACKMON
RONN I E S I ZEMORE
V. A. "DICK" BRADLEY,.JR.
P. JIMENEZ, JR., M.D.
GABE LOZANO, SR.
KEN MCDANIEL
W. J. "WRANGLER" ROBERTS