Loading...
HomeMy WebLinkAbout09122 ORD - 11/20/196811- 18- 68:FMB • AN ORDINANCE RECEIVING AND ACCEPTING CONSTRUCTION OF THE EVERHART ROAD IMPROVEMENTS, FROM PADRE ISLAND DRIVE TO HOLLY ROAD, PROJECT NO. 220- 67 -89, AS PERFORMED BY THE CON- TRACTOR, HELDENFELS BROTHERS, UNDER THEIR CONTRACT DATED MARCH 20, 1968, AUTHORIZED BY ORDINANCE NO. 8803; AUTHORIZING PAYMENT OF FINAL ESTIMATE NO. 3 DATED NOVEMBER 1, 1968, IN THE AMOUNT OF $56,220.48, A COPY OF WHICH IS ATTACHED HERETO AND MADE A PART HEREOF, SAID PAYMENT TO BE MADE FROM NO. 220 STREET FUNDS PREVIOUSLY APPROPRIATED FOR CONSTRUCTION AND CONTIN- GENCIES; AND DECLARING AN EMERGENCY. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. THAT THE CONSTRUCTION OF THE EVERHART ROAD IMPROVE- MENTS, FROM PADRE ISLAND DRIVE TO HOLLY ROAD, PROJECT N0. 22o- 67 -89, AS PERFORMED BY THE CONTRACTOR, HELDENFELS BROTHERS, UNDER THEIR CONTRACT DATED MARCH 20, 1968, AUTHORIZED BY ORDINANCE N0. 8803, HAVING BEEN PER- FORMED AND COMPLETED IN ACCORDANCE WITH THE TERMS AND PROVISIONS OF THE CONTRACT, PLANS AND SPECIFICATIONS THEREIN CONTAINED, AND THE DIRECTOR OF PUBLIC WORKS HAVING INSPECTED THE SAME AND CERTIFIED TO THE COMPLETION OF SAID WORK IN ACCORDANCE WITH SAID PLANS AND SPECIFICATIONS, THE WORK AFORESAID IS HEREBY FOUND TO HAVE BEEN COMPLETED IN ACCORDANCE WITH THE PLANS AND SPECIFICATIONS, AND IS HERE AND NOW ACCEPTED AND RECEIVED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS. SECTION 2. THAT FINAL PAYMENT IS HEREBY AUTHORIZED AS DUE UNDER THE CONTRACT AND AS SET OUT IN FINAL ESTIMATE N0. 3, DATED NOVEMBER 1, 19681 ATTACHED HERETO AND MADE A PART 1H EREOF, PREPARED BY THE DIRECTOR OF PUBLIC WORKS, IN THE AMOUNT OF $56,220.48, FROM FUNDS PREVIOUSLY APPROPRIATED OUT OF NO. 220 STREET BOND FUND. SECTION 3. THE NECESSITY FOR COMPLETION OF SUCH WORK BY SAID ACCEPTANCE AND FINAL PAYMENT IMMEDIATELY CREATES A PUBLIC EMERGENCY AND AN IMPERATIVE PUBLIC NECESSITY REQUIRING THE SUSPENSION OF THE CHARTER RULE THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE OF ITS INTRODUCTION AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT 9 122' `j CITY OF CORPUS CHRISTI, TEXAS DEPARTMENT OF PUBLIC WORKS - ENGINEERING & CONSTRUCTION DIVISION CONTRACT MONTHLY ESTIMATE P9r'2 FORM -6 Project FVFRHART ROAD IMPRIIVFMFNTSB PAnRF IS H. n 1.10 1 Y R6] Pro.iect No. 220 -67 -89 Est No 3 (FINAL) Contractor: HELDENFELS BROS.. Date 1 November 1968 P.O. Box 1917, Corpus Christi, Texas 78403 Sheet of Item No. Item Description - Unit Proi. Eat. Quantities Total Work Done on Cont. Contract Unit Price Amomt A. Street;Reconstruction 0 % Retained - - - 1 Approv 1J -1 .3 _�f 1. Street Excavation S.Y. 26,462 29,168 .80 23,334.40 2. 6" Lime Stabilized Base S.Y. 26,462 26,314 .55 14,472.70 3. Flexible Base, Caliche C.Y. 7,382 6,885 3.30 22,720.50 4. Prime Coat, MC -1 Gal. 3,525 4,051 .22 891.22 5. Type "D" Asphaltic Coln. Ton 2,174 2,146. 8.95 19,207.60 6. Liquid Asphalt (OA -90) Ton 176 161. 8.95 1,444.53 7. 6" Curb & Gutter L.F. 7,767 7,770. 5 1.80 13,987.53 8. 4"x5'= 0 "Reinf.Conc.S',Walk S.F. 34,128 32,712.18 .50 16,356.09 9. Concrete Driveways S.F. 3,157 5.858.1)3 .80 4,686.42 10. 5' Standard Inlets Ea. 9 9 210.00 1,890.00 11. 5' Special Inlets Ea. 10 10 210.00 2,100.00 12. 15" R.C.P. L.F. 394 388 5.20 2,017.60 13. 18" R.C.P. L.F. 199 186 6.00 1,116.0 14. 24" R.C.P. L.F. 2,234 2,216 7.25 16,066.00 15. 27" R.C.P. L.F. 618 618 8.00 4,944.00 16. 30" R.C.P. L.F. 85 85 9.30 790.50 17. Corr.Metal Pipe(22 "xl3 ") L.F. 43 43 7.10 305.30 18. " " " 29 "x18" L.F. 364 364 9.90 3,603.60 19. Type A. Manholes Ea. 13 13 250.00 3,250.00 20. Shallow Manholes Ea. 6 6 225.00 1,350.00 21. Conn.to Exist,M'Holes(San.)Ea. 2 2 50.00 100.0 22. " a n " (Storm) Ea. 2 2 300.00 600.00 23. 8" Vit. Clay Pipe L.F. 94 90 5.00_ 450.00 24. Sanitary Manholes Ea. 2 2 250.00 500.00 25. Remove Exist.Timb.Dridge L.S. 1 1 350.00 350.00 26. Barricade Ea. 1 0 175.00 - J - 27. Salvage Caliche Base C.Y. 1,430 1,372 1.50 2,058.0 28 Shell Driveways 8 S.W. C.Y. 52 0 4.75 - 0 - 29. Remove Conc. Box Culvert Ea. 2 2 750.00 1,500.0 B. Lowering Railroad 1. Excavation C.Y. - 273 213 2.25 479.2 2. Prep.of Subgrade,10 "Lime S.Y. 805 778 1.25 972.5 Stabilized riinnnp Certified y 161,903.74 Correct: �' G +� Date / -�� - �� Total Work Done Chies . & Constr. 0 % Retained - - - 1 Approv 1J -1 .3 _�f Amount Payable 161,903.74 Recom ended: Date ector of Public Works 105 6b3.26 Previous Payments , Approved: Date - Due This Estimate 566,220.48 City Manager -. - - - - I Estimate Checke A ate .ggT"qN PRINT Riq L0. RL•gRLLR N0. ,Bql �18 • CITY OF CORPUS CHRISTI - CONTRACT TIME STATEMENT Estimate No -3 Dot�1 November i98 contractor HELDENFELS BROS. Prvjcr+ EVERHART RD..PADRE IS.DR.tEo HOLLY RD, Time Started July 23 1968 Date Work Eagan JUIy 23 19 6S Date Work Completed November 1 19 68 Amount of Contract $ 160.842. 70 Amount of Liquidated Damages Per Day $ M—h Dom working Coed Day. NHS Charged and Reasons Tkarefm ovembor 1 2, 3 4 5 6 S 9 10 ti 12 13 14 15 16 17 is 19 20 21 22 23 24' 25 26 27 28 29 30 31 snh Tema T-1 to Dem 64 jb No. contract working days 120 plus 0 days extensions. No. working days used to date 04 No. days overrun 0 Amount of liquidated damages $ '`0" Remarks as correct, with one copy to contractor. . P+El—a By - MUNROE A BASS �I6 • CITY OF CORPUS CHRISTI — CONTRACT TIME STATEMENT Estimate No 3 Dated October 1968' Contractor HELDEPBFEL BROS. Protect EVERHART RD. PADRE ISLAND DR.tO HOLLY RQ'ime Started MY 23 1960 Date Work Beg;,, JU1Y 23 1968 Date Work Completed 19_ Amount of Contracts 160,8442.70 Amount of Liquidated Damages Per Day $ No. contract working days 1 h t5 plus 0 days extensions. No. working days used to date 63 No. days overran -0— Amount of liquidated damages $ -- -- —. Rem s as correct, wIIn one copy Prepared By ADI ed 1 MUNROE & BASS 4.. 0 0 MONTHLY AFFIDAVIT ON PROJECTS FOR CITY OF CORPUS CHRISTI STATE OF TEXAS COUNTY OF NUECES G I H. C. Heldenfels hereby certify that to the best of my knowledge and belief all conditions, including payment of Minimum Wage Rates, specified in Contract with the City of Corpus Christi, Texas for Cpnetr r K000 p£ aTreat improvements - Noijy Koad to ou Padre Island Drive have been complied with by Heldenfels Brothers for the month of October 19 68 Signed�'�Z Title Partner �SSw'orJnOto before me this day of November 19 68. v"�A Notary Public, Nueces County, Texas. VIOLA TEEL Notary Public, In and for Nueces county, Texas ,. ;y Commission Expires June 1, 19110 TO THE MEMBERS OF THE CITY COUNCIL CORPUS CHRISTI, TEXAS CORPUS CHRISTI, TEXAS (� DAY OFL�Q� . FOR THE REASONS SET FORTH IN THE EMERGENCY CLAUSE OF THE FOREGOING ORDINANCES A PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST FOR THE SUSPEN- SION OF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE IT IS INTRODUCED, AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY COUNCILS I, THEREFORE REQUEST THAT YOU SUSPEND SAID CHARTER RULE OR REQUIREMENT AND PASS THIS ORDI- NANCE FINALLY ON THE DATE IT IS INTRODUCED OR AT THE PRESENT MEETING OF THE CITY COUNCIL. RESPECTFULLY J� R THE CITY OF CORPUS CHRISTI, TEXAS THE CHARTER RULE WAS S SPEN ,I BY THE FOLLOWING VOTE: JACK R. BLACKMON RONNIE SIZEMORE V. A. "DICK" BRADLEY JR. el P. JIMENEZ, JR., M.D. GABE LOZANO, SR. KEN MCDANIEL W. J. "WRANGLER" ROBERTS THE ABOVE ORDINANCE WAS PASSED BY THE FOLLOWING VOTE: JACK R. BLACKMON RONN I E S I ZEMORE V. A. "DICK" BRADLEY,.JR. P. JIMENEZ, JR., M.D. GABE LOZANO, SR. KEN MCDANIEL W. J. "WRANGLER" ROBERTS