AN ORDINANCE
RECEIVING AND ACCEPTING CONSTRUCTION OF THE TARLETON,
COLEMAN AND MITCHELL STREET IMPROVEMENTS, PROJECT
NO. 220- 67 -99, AS CONSTRUCTED BY THE CONTRACTOR,
ASPHALT PAVING COMPANY, UNDER CONTRACT DATED APRIL 3,
1968, AUTHORIZED BY ORDINANCE NO. 8822; AUTHORIZING
PAYMENT OF FINAL ESTIMATE NO. 7, DATED NOVEMBER 18,
1968, IN THE AMOUNT OF $13,113.51, A COPY OF WHICH
IS ATTACHED HERETO AND MADE A PART HEREOF, SAID PAYMENT
TO BE MADE FROM NO. 220 STREET BOND FUNDS PREVIOUSLY
APPROPRIATED FOR CONSTRUCTION AND CONTINGENCIES; GRANT-
ING A 26 -DAY EXTENSION OF CONTRACT TIME FOR COMPLETION;
AND DECLARING AN EMERGENCY.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS:
SECTION 1. THAT THE CONSTRUCTION OF THE TARLETON, COLEMAN AND
MITCHELL STREET IMPROVEMENTS, PROJECT NO. 220- 67 -991 AS PERFORMED BY THE
CONTRACTOR, ASPHALT PAVING COMPANY UNDER THEIR CONTRACT DATED APRIL 3, 1968,
AUTHORIZED BY ORDINANCE NO. 8822, HAVING BEEN PERFORMED AND COMPLETED IN
ACCORDANCE WITH THE TERMS AND PROVISIONS OF THE CONTRACT, PLANS AND SPECIFI-
CATIONS THEREIN CONTAINED, EXCEPT AS HEREINAFTER PROVIDED, AND THE DIRECTOR OF
PUBLIC WORKS HAVING INSPECTED THE SAME AND CERTIFIED TO THE COMPLETION OF SAID
WORK IN ACCORDANCE WITH SAID PLANS AND SPECIFICATIONS, EXCEPT AS HEREINAFTER
SET FORTH, AND IS HERE AND NOW ACCEPTED AND RECEIVED BY THE CITY COUNCIL OF
THE CITY OF CORPUS CHRISTI, TEXAS.
SECTION 2. THERE IS HEREBY GRANTED A CONTRACT TIME EXTENSION OF
26 DAYS FOR COMPLETION OF THE HEREINABOVE DESCRIBED CONTRACT.
SECTION 3. THAT FINAL PAYMENT IS HEREBY AUTHORIZED AS DUE UNDER
THE CONTRACT AND AS SET OUT IN FINAL ESTIMATE N0. 7, ATTACHED HERETO AND
MADE A PART HEREOF, PREPARED BY THE DIRECTOR OF PUBLIC WORKS DATED NOVEMBER 18,
1968, IN THE AMOUNT OF $13,113.51, FROM FUNDS PREVIOUSLY APPROPRIATED.
SECTION 4. THE NECESSITY FOR COMPLETION OF SUCH WORK BY SAID
ACCEPTANCE AND FINAL PAYMENT IMMEDIATELY CREATES A PUBLIC EMERGENCY AND
AN IMPERATIVE PUBLIC NECESSITY REQUIRING THE SUSPENSION OF THE CHARTER RULE
THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE OF ITS
INTRODUCTION AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE
SEVERAL MEETINGS OF THE CITY COUNCIL, AND THE MAYOR HAVING DECLARED SUCH
EMERGENCY AND NECESSITY TO EXIST, AND HAVING REQUESTED THE SUSPENSION OF
91-211S,
.y r
CITY OF CORPUS CHRISTI, TEXAS
DEPARTMENT OF PUBLIC WORKS - ENGINEERING Se CONSTRUCTION DIVISION
CONTRACT MONTHLY ESTIMATE
PW2 FORM 6
Project - Tarleton, Coleman, Mitchell Street Improvements
Est. No 7 P. Ping
Contractor: Aspbe1+: Paying Co- Date Nov, ]g68
P o Box 4282 Corpus aP.rlsti Texas Sheet i Of_�
Item
No.
Item Description
Unit
Proi. Est
Quantities
Total Work
- Done on Cont.
Contract
Unit Price
Amount
1.
Excavation
S.Y.
21,520
21,570
•70
15,699.00
2.
Deleted
3.
Salvaged Cali.che
C.Y.
978
940
1.50
1,4lo.00
4.
New Caliehe
C.Y.
7,000
7,136
3.20
22,816.0o
5.
Prime Coat MC-70
Gal.
2,690
2,690
.20
538.01
6.
Type D Hot Mix shell aggrelpte
Ton
1,276
1,369.6
10.20
13,969.92
T.
Liquid Asphalt OA -90
Ton
96
1,3.9
10.20
1,- .59.78
8.
Curb and Gutter
L.F.
9,037
8,916.3
1.80
16,1:49.34
9.
Concrete Sidewalk
S.F.
31,250
32,677.8
.48
15,685.34
10.
Concrete Driveways
S.F.
11,500
12,361.1
.80
9,888.88
U.
Type A Manholes
Each
6
6
250.00
1,5(;!)O
12.
Adjust Existing Inlets
Each
4
2
60.00
120.00
13.
5' Inlets
Each
24
31
24o.00
7,444,,. (Jo
14.
12" 13.Q.P•
L.F.
16
24
6.00
144.uu
15.
15" H.C.P.
L.F.
1,120
952
5.30
5 4 60
,'�� 5•
16.
18" R.C.P.
L.F.
334
448.5
7.00
3,139.5 =,
17.
21" R.C.P.
L.F.
373
369'
7.50
2,767.5(
18.
24" R.C.P.
L.F.
553
561
8•0o
4,488 -o0
19.
27'R.6.P.
L.F.
64
36
9.00
324. u0
20.
11" x 18" C.G.M. Arch Pipe
L.F.
30
3�
7.00
21u.1..0
Change Order No. 1
L.S.
lv
362.4o
362,4(:
Change Order No. 2
Grate Inlets
Each
2
50.00
1CU..jO
Sidewalk Drains
L.P.
25
10.00
�5CI,0r,
Certified / 1
Correct: N � 2*-/'/-
! Chief & Caa
Approval
Recommended:
Direct& of Public Works
City Manager
ROT80n wAINTiNb - me- ORDER. NM -1
Date ��_ r �_ Total Work Done,e2,)!()T;26
_,,_% Retained _
Date /� Z� Amount Payable, 4^Td6
Previous Payments 1 9.,093 75
Due This Estimate
Estimate Checked Date
CITY OF CORPUS CHRISTI — CONTRACT TIME STATEMENT
Estimate No 7&Flnal Dated j-'1� 19 Contractor Asphalt Pam ng Co.
Project Coleman, Tarleton & VV tchell 'lime Started nLy 16, 19�
Date Work Began May 162 19 68 Date Work Completes November 19, 1968
Amount of Contract $ 117,e67.50 Amount of Liquidated Damages Per Day $
Moth
Date
Days
working
Dan Days
Charged -
- -
Doys Not Charged end Beas®s Therefor
1
1
" 2
,3.
1
4
1
5
6
7
8
9
to
it
12
13
14
15
16
—saturday
17
Sunday
18
19
20
21
-
-
22
23
24
25
26
27
29
30
31
Sub Total
Preeiovs TA.1
I log
-
Ttel W Date
No. contract working days 95 plug days extensions. No. working days used to date— 121
No. days overr In 26 Amount of liquidated damages $ —. Remarks
Certified as correct, with one copy to contractor.
1
Prepared By r7 �`• 1511'8' .:i by Cily E>te
E 883 -6369
./Itdp�a[f
• CORPUS CHRISTI, TEXAS 78408
November 11, 1968
STATE OF TEXAS
COUNTY OF NUECES
P. o. 1* 282
I, Rodney Parker, dba Asphalt Paving & Construction Co,
hereby certify that to the best of my knowledge and belief
all conditions, including payment of Kinimum Wage Rates,
specified in Street Improvements on Tarleton I«itchell and
Coleman Streets have been complied with by Asphalt aving
Construction Com an and that all bills incurred on this
contract have een paid in full,
SIGNED
TITLE /l //,
SWORN TO AND BEFORE J4/ THIS day of, '_"Am Ae 19-9
_ Notary Public
county, Texas. My commission expires �(�
I• •
CORPUS CHRISTI, TEXAS
DAY OF
TO THE MEMBERS OF THE CITY COUNCIL
CORPUS CHRISTI, TEXAS
FOR THE REASONS SET FORTH IN THE EMERGENCY CLAUSE OF THE FOREGOING
ORDINANCE, A PUBLIC EIAERGE14CY AND IMPERATIVE NECESSITY EXIST FOR THE SUSPEN-
SION OF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE OR RESOLUTION SHALL
BE PASSED FINALLY ON THE DATE IT IS INTRODUCED, AND THAT SUCH ORDINANCE OR
RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY COUNCIL; I, THEREFORE,
REQUEST THAT YOU SUSPEND SAID CHARTER RULE OR REQUIREMENT AND PASS THIS ORDI-
NANCE FINALLY ON THE DATE IT IS INTRODUCED, OR AT THE PRESENT MEETING OF THE
CITY COUNCIL.
RESPECTFULLY,
MAYOR -- �i�j
L THE CITY OF CORPUS CHRISTI, TEXAS
THE CHARTER RULE WAS SUSPENDED BY THE FOLLOWING VOTE:
JACK R. BLACKMON 1 /
RONNIE SIZEMORE
V. A. "DICK" BRADLEY, JR y
P. JIMENEZ, JR., M.D.
GABE LOZANO, SR.
KEN MCDANIEL
W. J. "WRANGLER" ROBERTS
THE ABOVE ORDINANCE WAS PASSED BY THE FOLLOWING VOTE:
JACK R. BLACKMON
RONNIE SIZEMORE
V. A. "DICK" BRADLEY, JR.,
J P. JIMENEZ, JR., M.D.
I GABE LOZANO, SR.
KEN MCDANIEL
W. J. "WRANGLER" ROBERTS,