HomeMy WebLinkAbout11130 ORD - 10/18/19720 JRR:ml:10- 16- 12;13t AN ORDINANCE AUTHORIZING THE EXECUTION OF CHANGE ORDER NO. 8 TO THE CONTRACT WITH BURTEX CONSTRUCTORS, INC. FOR THE CON- STRUCTION OF THE LEOPARD STREET 48" WATER TRANSMISSION MAIN, SAID CHANGE ORDER REPRESENTING ADDITIONAL COST IN- CURRED BY THE CONTRACTOR FOR THE USE OF DUCTILE PIPE AND FITTINGS IN LIEU OF STEEL PIPE AND FITTINGS ACROSS THE FAULT ZONE AREA; APPROPRIATING OUT OF THE NO. 202 WATER SYSTEM BOND FUND $28,184.25 FOR THE AFORESAID CHANGE ORDER OF WHICH $12,223.15 IS FOR THE CONSTRUCTION CONTRACT AND $15,961.10 IS FOR CONTINGENCIES AND INCIDENTAL EXPENSES, INCLUDING $15,931.10 FOR RESIDENT INSPECTION AND $30.00 FOR LABORATORY TESTING; AND DECLARING AN EMERGENCY. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, SECTION 1. That the City Manager be, and he is hereby authorized • to execute Change Order No. 8 to the contract with Burtex Constructors, Inc. for the construction of the Leopard Street 48" water transmission main, Project No. 202 -68 -29.1, said Change Order representing additional cost incurred by the contractor for the use of ductile pipe and fittings in lieu of steel pipe and fittings across the fault zone area, a copy of said Change Order No. 8 being attached hereto as Exhibit "A ", and made a part hereof. SECTION 2. There is hereby appropriated out of the No. 202 Water System Bond Fund $28,184.25 for the aforesaid Change Order No. 8, of which $12,223.15 is for the construction contract and $15,961.10 is for contingencies and incidental expenses, including $15,931.10 for resident inspection and $30 for laboratory testing. SECTION 3. The necessity to authorize the execution of the aforesaid Change Order and the appropriation of the necessary funds in order that the project may continue without delay creates a public emergency and an imperative public necessity requiring the suspension of the Charter rule that no ordinance or resolution shall be passed finally on the date of its introduction but that such ordinance shall be read at three several meetings of the City Council, and the Mayor having declared such emergency and necessity to exist, and having the suspension of the Charter rule and that this ordinance be passed finally on the date of its introduction and take effect and be in full force and effect from and after its passage, IT IS ACCORDINGLY SO ORDAINED, this the ,.J_ -U- day of October, 1972. ATT ` � City Secret a MAYOR APPROVED-- THE CITY OF CORP U ISTI, TEXAS O � � � SRSST X30 City Attorney- • .. CHANGE ORDER Engineering Services.Department Engineering Division City of Corpus Christi, Texas nange Order No. 8 Project No. 202 -68 -29.1 Aerating Department Water Date October 12, 1972 ame of Project Leopard Street Water Transmission Line ontractor Burtex Constructors CHANGE FAULT ZONE CROSSING: t of Ductile Pipe and fittings per Sales Order Contract $32,132.90 Other Miscellaneous Items 1,537.00 Total Cost for Ductile Iron & Materials $33,669.90 DEDUCT: t of Steel Pipe & Fittings $22,729.55 Other Miscellaneous Costs 460.00 $23, 189. 55 Difference in Costs TTU �� General conditions 6 %u 628.82 Overhead and Profit 1576 1,666.38 TOTAL NET COST =. • DEDUCT ay was this change neces9aryl (If left off the plans and specifications, expiain wny.; Additional costs incurred by Contractor in the use of ductile iron pipe and fittings in lieu of steel pipe and fittings as anticipated by Contractor ow can similar changes be avoided in the tuturel ontract Price 3,155,279.80 _is Change Order 12 ew Contract Price 3 168m 055. 35 mount Appropriate 3.225_000.00 TY OF CORPUS CHRISTI. TEa' If City Manager City Attorney Mc UGRAN & THE DGE 1G�,��jll%11,1�� ChiefjEngineer CONTRACTOR BURTEX CONSTRUCTORS, Inc. Dy / T �9 �ti/.e�C°wG i+/lac/A6�R NOTE: Contractor, please sign one copy and return it to the Director of Engineering Services. Dir. of Finance Rev. 6 -71 i CITY OF CORPUS CHRISTI, TEXAS CERTIFICATION OF FUNDS (City Charter Article IV Section 21) October 13, 1972 I certify to the City Council that $ 28,184,25 , the amount required for the contract, agreement, obligation or expenditures contemplated in the above and foregoing ordinance is in the Treasury of the City of Corpus Christi to the credit of: Fund No. and Name No 202 Water System Bond Project No. 202 -68 -29.1 Project Name Leonard Street 48" Water Transmission Main from which it is proposed to be drawn, and such money is not appropriated for any other purpose. �9im- irector of nance z,C L-P FIN 2 -55 Revised 7/31/69 „ CORPUS CHRISTI, TEXAS DAY OF r` /T- f 19. 7z TO THE MEMBERS OF THE CITY COUNCIL CORPUS CHRISTI, TEXAS _ FOR THE REASONS SET FORTH IN THE EMERGENCY .CLAUSE OF THE FOREGOING ORDINANCE, A PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST FOR THE SUSPEN- SION DF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE IT IS INTRODUCED, AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY COUNCIL; 1, THEREFORE, REQUEST THAT YOU SUSPEND SAID CHARTER RULE OR REQUIREMENT AND PASS THIS ORDI- NANCE FINALLY ON THE DATE IT IS INTRODUCED, OR AT THE PRESENT MEETING OF THE CITY COUNCIL. RE LY, o 0 L000 YOR IF THE CITY.OF G S HRISTI, TEXAS THE CHARTER RULE WAS SUSPENDED BY THE FOLLOWING VOTE: RONNIE SIZEMORE , CHARLES A. BONNIWE LL ROBERTO BOSQUEZ, M.D. A— REV. HAROLD.T. BRANCH .,e THOMAS V. GONZALES ILI GAGE LOZANO, $R. � J. HOWARD STARK THE ABOVE ORDINANCE WAS PASSED BY THE FOLLOWING VOTE: - BONNIE SIZEMORE CHARLES A. BONNIWELL - ROBERTO BOSQUEZ, M.D. REV. HAROLD T. BRANCH THOMAS V. GONZALES " GA BE LOZANO, SR. (kc.� J. HOWARD STARK R_