HomeMy WebLinkAbout11373 ORD - 03/21/1973JI: " %Fac ir119/f3 1ST
AN ORDiNANCE
AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH
NAISMITH ENGIPIEER$, INC., FOR ENGINEERING SERVICES FOR
EiOULEVARDIITOFVIICINITY�OF HEROOSAYDRIVE, AND FROM EA PARKWAY
FROtd FLYNN PARKWAY TO EVERHART ROAD, PROJECT NO. 295-72-9y
A COPY OF WHICH CONTRACT 15 ATTACHED HERETO, MARKED
EXHIBIT "A" AND MAlE A PART HEREOF; 635,750 FOR SAID SERVICES;
THE NO. 295 STORM SEI :JER 60iJD FUND ti , 4
AND DECLARING AN EMERGENCY.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS:
SECTION 1. THAT THE CITY MANAGER BE, AND HE IS HEREBY, AUTHORIZED
INC., FOR ENGINEERING SERVICES
70 EXECUTE A CONTRACT WITH NAISMITH ENGINEERS,
FOR THE DESIGN OF . IMPROVEMENTS TO,FLYNN PARKWAY FROM SARATOGA BOULEVARD TO
THE VICINITY OF HERMOSA DRIVE, AND SHEA PARKWAY FROM FLYNN PARKWAY TO EVERHART
HERETO,
ROAD, PROJECT NO. 295 -72 -9, A COPY OF. WHICH CONTRACT IS ATTACHED
MARKED EXHiBIT "A" AND MADE A PART HEREOF. STORM
SECTION 2. THERE IS HEREBY APPROPRIATED OUT OF THE N0. 295
$EWER BOND FUND THE SUM OF µ'35,75B FOR SAID SERVICES.
SE TION 3. THE CITY MANAGER 70 EXECUTE
NECESSITY TO AUTHORIZE THE
NGINEERS, INC- FOR ENGINEERING SERVICES AND TO
A CONTRACT WITH NAISMITH E
IMMEDIATELY APPROPRIATE THE HEREINABOVE DESCRIBED FUNDS CREATES A PUBLIC
IMMEDIATELY
SUSPENSION OF THE
EMERGENCY AND IMPERATIVE PUBLIC NECESSITY REQUIRING THE
CHARTER RULE THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE
DATE OF ITS INTRODUCTION AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ
MAYOR HAVING DECLARED
AT THREE SEVERAL MEETINGS OF THE CITY COUNCIL, AND THE
SUCH EMERGENCY AND NECESSITY TO EXIST, AND HAVING REQUESTED THE SUSPENSION
OF THE CHARTER RULE AND THAT THIS ORDINANCE BE PASSED FINALLY ON THE GATE OF
ITS INTRODUCTION AND TAKE EFFECT AND BE IN FULL FORCE AND EFFECT FROM AND
._//- DAY OF
AFTER ITS PASSAGE, IT IS ACCORDINGLY SO ORDAINED, THIS THE /(GS!
MARCH, 7973•
ATl'ESTa O
/,C �PfAY02 -- _
CITY TICKET Rr / THE CITY OF C P S CHRISTI, TEXAS
APPROVED: v
�y DAY (IF MARCH, 1913
CG /ly/y �i T RNE 1' M i.yLl.9 3
0
CONTRACT FOR ENGINEERING SERVICES
THE STATE OF TEXAS
COUNTY OF NUECES
•
A
The City of Corpus Christi, hereinafter called "City ", and Naismit
Engineers, Inc., hereinafter called "Engineer ", whether one or more, agree as
follows:
1. Services to be Performed. The Engineer hereby agrees, at his own
expense, to perform all engineering services necessary to properly develop de-
sign plans and specifications on the following improvements to the Drainage
System of the City of Corpus Christi:
A. "The Services shall include the preparation of plans
and specifications for improvements to the Flynn
Parkway from Saratoga Blvd. to near Hermosa Street
and Shea Parkway from Flynn Parkway to Everhart Rd.
The Scope includes, but is not limited to, plans and
specifications for partial concrete lining, structures,
grading, shaping, etc. of the drainage system."
2. Scope of Services. Engineer's services for Items 2 -A, 2 -B and
2 -C will be those services which are in accordance with the Manual of Practice,
General Engineering Services, as published in 1972 by the Texas Society of
and Consulting Engineers Council of Texas, and Will in-
Professional Engineers ,
elude the following scope of basic services:
A. In the Preliminary Phase: (the Scope of basic Services includes)
(1) Conferences with the proper City representative
regarding the proposed project
(2) Studies and preliminary reports directly related
to and part of the work being considered. Con-
sultations, with City regarding location Scope of
work, location of utilities, etc. The City will
furnish for the use of the Engineer preliminary in-
formation, copies of plans of such existing facili-
ties as are necessary and available, and other avail-
able information pertinent to the planning and
design.
•
(3) preliminary cost estimates of proposed construction
in phases, if necessary.
(4) Preparation of all preliminary engineering documents
for making application to Federal agencies if such
application for funds is warranted and justified on
the project and prepare all such forms required on
behalf of the City.
B. In the Design Phase for work as authorized by City:
the basic Services include
(1) Field surveys for detailed plans.
(2) Furnishing engineering data.necessary for permits
required by local, state and federal authorities and
assist City with coordination of project with Federal
agencies.
(3) Preparation of detailed contract plans and specifica-
tions for construction, with five (5) sets of plans and
twenty -five (25) sets of specifications and contract
documents furnished to the City. (Additional copies
will be furnished as required at actual cost of
reproduction.)
(4) Preparation of estimates of quantities and costs.
(5) Assistance to City in securing bids.
(6) Analysis of bids and recommendations concerning awards.
(7) Assistance in award of contracts.
(8) All other work necessary for the full performance of
the engineering design of the project but not limited
to items listed above.
C. In the Construction Phase: (the Scope of basic Services
shall Include
(1) Checking of shop and working drawings when required
and furnished by contractor.
(2) Supervision and review of laboratory tests.
(3) Consultation with the City and advice during construe-
tion
(4) Preparation of estimates of quantities and costs.
(5) Assistance to City in securing bids.
(6) Analysis of bids and recommendations concerning awards.
(7) Assistance in award of contracts.
(8) A11 other work necessary for the full performance of
the engineering design of the project but not limited
to items listed above.
C. In the Construction Phase: (the Scope of basic Services
shaL'L Include
(1) Checking of shop and working drawing when required and
and furnished by contractor.
(2) Supervision and review of laboratory tests.
(3) Consultation with the City and advice during construction.
(4) General supervision of the work and interpretation of
the plans and specifications by periodic visits to the
site by a principal of -:;he firm.
(5)
Preparation of monthly and final estimated for payments
to the contractors.
(6)
Final inspection.
(7)
Revision of the construction drawings to show the
project as built.
(8)
All other work required in connection with the construe-
tion phase for the full and complete implementation of
this phase exclusive of resident inspection and labor-
atory testing.
3. Fee.
The basic
fee for performing the basic engineering services for
Items 2 -A, 2 -B, and 2 -C will be based on a percentage of the cost of construc-
tion contract as may be authorized by the City. This percentage shall be 6.5%-
Although the fee is based on 6.5% of the construction costs, this
figure will be adjusted upwards or downwards on Curve B of the Manual for
Engineering Practice depending on actual construction cost of the project.
such adjustment shall be the actual percentage on Curve B less 0.5% for work
previously performed by City.
•.
The 6 -% fee is based on a construction budget for the project of
$550,000. The engineer shall endeavor to design the project within the approved
budget and if, at the time of receiving bids, the bids are above the approved
budget the City shall have the right to require the engineer to revise the
plans in order to reduce the cost, at no additional fee.
The City will not pay the engineer any additional fee as the result
of change orders resulting from negligence of the engineer.
The fee for services for Items 2 -A, 2 -B, and 2 -C to be due and pay-
able as follows (said services above listed):
A. In the Preliminaty Phase:
For services rendered under the preliminary phase as described
above in amount equal to 20% of the basic fee. Approval of
the preliminary engineering plans will be required before pay-
ment.
B. In the Design Phase (for work as authorized by the City):
For services rendered under the design phase, as described
above, an amount equal to 65% of the basic fee for work au -,
thorized by the City shaLi. be due and payable. In the event
that proposals for construction on the work are received
after submission of complete contract plans and specifica-
tions to the City, the fee for services rendered for the
preliminary and design phases of this portion of the work
shall be adjusted to the "Construction Cost" as reflected
by the lowest bona fide bid. Where no proposals are received
within a period of 120 days from the date of approval, then
the engineer's estimates shall be the basis for final Pay-
ment for services rendered under the preliminary and design
phases, less credit for preliminary phase.
C. Construction Phase:
For services rendered under the construction phase, as de-
scribed above, an amount equal to 15% of the basic fee for
those portions of the work covered by construction contracts
shall be due and payable based pro rata on monthly estimates
of work performed by the contractor.
4. Termination of Contract.
The City may at any time, with or without cause, terminate this
contract. In the event of such termination, the engineer shall be compensated
for his services on all stages authorized as follows:
A. If termination occurs prior to the final completion and ap-
proval of the drawings and specifications, the engineer shall
be paid a reasonable compensation for the services actually
rendered by him in accordance with the above described sched-
ule of fees and in proportion to the amount of work done on
such stages or phases as have been authorized.
B. If termination occurs after final completion and approval of
the drawings and specifications, the fee of the engineer shall
be 60% of the basic fee based on engineer's construction es-
timate submitted with the design phase and approved by the
City, plus the fee paid for the preliminary Phase, less the't
credit as aforedescribed.
C. If termination occurs after the letting of the contract, but
prior to final completion or acceptance by the City, the fees
of the engineer shall be computed in accordance with the pro-
visions of Paragraphs 3 and 4 of this contract to the date
of termination.
D. The foregoing shall not be construed to require the City to
compensate the engineer for any services not performed in a
proper professional manner suitable for use in the construc-
tion of the project contemplated by the parties to this agree-
ment.
5, ownership of Documents.
Upon completion of the project (or upon termination of this con-
tract if previously terminated) the engineer shall furnish to the City, in a
suitable container for filing, "As Built" Plans, reproduced on linen or plastic
drafting film from the original drawings, together with a correct and legible
set of specifications.
6. Assignability.
The engineer shall not assign, transfer or delegate any of his
Ak-
•.
obligations or duties in this contract to any other person without the prior
written consent of the City, except for routine duties delegated to personnel
of the engineer's staff. If the engineer is a partnership, in the event of the .
termination of the partnership, this contract shall inure to the individual bene-
fit of such partner or partners as the City may designate. No part of the
engineer's fee may be assigned in advance of receipt by the engineer without
written consent of the City.
7. Technical Assistance and Consultations.
The City shall not pay the fees of expert or technical assistants
and consultants unless such employment, including the rate of compensation, has
been approved in writing by the City.
Executed in duplicate, each of which shall be considered an original,
this day of , 1973•
ATTEST: THE CITY OP CORPUS CHRISTI
BY
City Secretary R. Mervin Townsend, City Manager
APPROVED: NAIMUTH ENGINEERS, INC. 1
day of , 1973 By
Director of Finance
CORPUS CHRISTI, TEXAS
2L/_ DAY OF 19
TO THE MEMBERS OF THE CITY COUNCIL
CORPUS CHRISTI, TEXAS
FOR THE REASONS SET FORTH IN THE EMERGENCY 'CLAUSE OF THE FOREGOING
ORDINANCE, A PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST FOR THE SUSPEN-
SION OF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE OR RESOLUTION SHALL
BE PASSED FINALLY ON THE DATE IT IS INTRODUCED, AND THAT SUCH ORDINANCE OR
RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY COUNCIL; I, THEREFORE,
• REQUEST THAT YOU SUSPEND SAID CHARTER RULE OR REQUIREMENT AND PASS THIS ORDI-
NANCE FINALLY ON THE DATE IT IS INTRODUCED, OR AT THE PRESENT MEETING OF THE
CITY COUNCIL. _
a LLY,
MAYOR
THE CITY F CO CHRISTI,, TEXAS
THE CHARTER RULE
WAS-SUSPENDED BY THE FOLLOWING VOTE:
• _ _ BONNIE SIZEMORE
.- CHARLES A. BONNIWELL
• - ROBER TO BOSQUEZ, M.D. `�OF =•-.
REV. HAROLD T. BRANCH
• THOMAS V. GONZALES '
• GABE LO 2A NO, SR, .
• J. HOWARD STARK --� •
THE ABOVE ORDINANCE WAS PASSED BY THE FOLLOWING VOTE:
• RONNIE SIZEMORE ,
CHARLES A. BONNIWELL
ROBERTO BOSQUEZ, M.D.
• -REV. HAROLD T. BRANCH
THOMAS V. GONZALES
• GABE LOZANO, SR. .•
_ J. HOWARD STARK •