HomeMy WebLinkAbout11384 ORD - 03/21/1973JRR/Mc 3/19/73 1sT •
A14 ORDINANCE
AUTHORIZING THE CITY MANAGER TO EXECUTE A CONTRACT WITH
MAVERICK ENGINEERIINIS COMPANY FOR ENGINEERING SERVICES
FOR THE DESIGN OF IMPROVEMENTS TO hiCARDLE ROAD FROM
AIRLINE ROAD TO MOUNT VERNON PARK, PROJECT NO. 220 -72 -3,
A COPY OF WHICH CONTRACT IS ATTACHED HERETO, MARKED
EXHIBIT "A" AND MADE A PART HEREOF; APPROPRIATING OUT OF
THE NO. 220 STREET BOND FUND $26,000 OF WHICH $24,500
IS FOR ENGINEER'S FEES AND $1,500 FOR INCIDENTAL EXPENSES;
AND DECLARING AN EMIERGENCY.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS.
SECTION 1. THAT THE CITY MANAGER BE, AND HE IS HEREBY, AUTHORIZED
TO EXECUTE A CONTRACT WITH MAVERICK ENGINEERING COMPANY FOR ENGINEERING
SERVICES FOR THE DESIGN OF IMPROVEMENTS TO MCARDLE ROAD FROM AIRLINE ROAD
TO MOUNT VERNON PARK, PROJECT No. 220 -72 -3, A COPY OF WHICH CONTRACT IS
ATTACHED HERETO, MARKED EXHIBIT "A" AND MADE A PART HEREOF.
SECTION 2. THERE IS HEREBY APPROPRIATCO OUT OF THE N0. 220 STREET
�BOND FUND THE SUM OF $26,000 OF WHICH $211,500 IS FOR ENGINEER'S FEES AND
$1,500 FOR INCIDENTAL EXPENSES.
SECTIUN 3. THE NECESSITY TO AUTHORIZE THE CITY MANAGER TO EXECUTE
THE AFORESAID CONTRACT FOR ENGINEERING SERVICES AND TO IMMEDIATELY APPROPRIATE
THE HEREINABOVE DESCRIBED FUNDS CREATES A PUBLIC EMERGENCY AND IMPERATIVE
PUBLIC NECESSITY REQUIRING THE SUSPENSION OF THE CHARTER RULE THAT NO ORDINANCE
OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE OF ITS INTRODUCTION AND
THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE SEVERAL MEETINGS
OF THE CITY COUNCIL, AND THE MAYOR HAVING DECLARED SUCH EMERGENCY AND NECESSITY
TO EXIST, AND HAVING REQUESTED THE SUSPENSION OF THE CHARTER RULE AND THAT
THIS ORDINANCE BE PASSED FINALLY ON THE DATE CF ITS INTRODUCTION AND TAKE
EFFECT AND BE IN FULL FORCE AND EFFEC ND AFTER ITS PASSAGE, IT.IS
ACCORDINGLY SO ORDAINED THIS THE D OF MARCH, 1
ATTES %0 z(
O
CITY SECRET AR � MAYOR
THE CITY OF CORPU`' 11 ISTI, TEXAS
APPROVED:
` DA OF MARCH, 1973:
(- TY tT IRNLY
11384
CONTRACT FOR ENGINEERING SERVICES
THE STATE OF TEXAS
COUNTY OF NUECES
The City of Corpus Christi, hereinafter called "City ", and
Maverick Engineering Company, hereinafter called "Engineer ", whether one
or more, agree as follows:
1. Services to be Performed. The Engineer hereby agrees, at his
own expense, to perform all engineering services necessary to properly develop
design plans and specifications on the following improvements to the street
system of the City of Corpus Christi
A. The services shall include the preparation of plans and speci-
fications and provide general supervision for the construction of
improvement:: to McArdle Road from Airline Road to Mt. Vernon Park
in Corpus Christi, Texas, such improvements to consist of street
paving,airbs, gutters, sidewalks and appurtenances within the
limits above defined.
2. Scope of Services. Engineer's services for Items 2 -A, 2 -B,
and 2 -C will be those services which are in accordance with the
Manual of Practice, General Engineering Services, as published in
1972 by the Texas Society of Professional Engineers, and Consulting
Engineers Council of Texas, and will include the following scope
of basic services:
A. In the Preliminary Phase:
(1) Conferences with the proper City representatives regarding
the proposed project.
(2) Studies and preliminary design report for the proposed
project involving the submission of five copies of the
report- to the City. Consultations with City regarding
location of lines in area described.
(3) Preliminary location, sizes and types of materials.
(4) Preliminary cost estimates of proposed construction in phases.
Vim, ,;�
(5) Establishing the'scope of any soil borings or subsurface
explorations and tests which may be required by local, state,
and federal authorities and required for design; arranging
for such work to be done directly for City's account, and
engineering interpretation of the results.
(6) Prepare statement on the social and economic effects of the
project to the area.
(7) The City will furnish engineer with preliminary inform-
ation, with copies of plans of such existing facilities as
are necessary and available, and with other information
pertinent to the planning and design.
B. In the Design Phase (for work as authorized by City):
(1) Field surveys for detailed plans.
(2) Providing field surveys during the preliminary and design
phases including plotting; field surveys, probing and mapping
to locate existing utilities and facilities pertinent to the
project in those cases where such maps are not available;
land surveys, establishing boundaries and monuments;
(3) Preparation of detailed contract plans and specifications
for construction, with five (5) sets of plans and twenty -
five (25) sets of specifications and contract documents
furnished to the City. (Additional copies will be furnished
as required at actual cost of reproduction.)
(4) Preparation of detailed cost estimate, notice to bidders,
and bidders' proposal forms for authorized construction;
(5) Assistance to City in securing bids.
(6) Analysis of bids and recommendations concerning awards.
(7) Prepare final contract documents required for the execution
of contract after award is made.
(8) Prepare property ownership map to be involved in plans and
specifications with all dimensions to be used in preparing
assessment roll for the required assessment hearing. Assist
the City as required during the preparation of assessment roll
and hearing.
C. In the Construction Phase:
(1) Engineering administration as distinguished from resident
field inspection of construction contract, including periodic
visits of engineer or competent representative of engineer;
(2) Supervision and review of laboratory tests.
(3) Consultation with the City and advice during construction.
(4) General Supervision of the work and interpretation of the
plans and specifications by periodic visits to the site by a
principal of the firm.
(5) Preparation of monthly and final estimates for payments
to the contractors.
(6) Final inspection.
(7) Revision of contract drawings, with assistance of resident
engineer, to show work as actually constructed which does
not require field work or measurements for this purpose or
redrawing of sheets, without additional compensation;
(8) Perform all other services required in connection with the
construction of the project exclusive of resident inspection
and laboratory testing not included in the items listed above
but necessary for the actual implementation of this phase.
3. Fee.
The basic fee for performing the engireering services listed for
Items 2 -A, 2 -B, and 2 -C will be based on a percentage of the cost
of construction contract as may be authorized by the City. This
percentage shall be 9.8 %.
Although the fee is based on 9.8% of the construction costs, this
figure will be adjusted upwards of downwards on Curve A of the Manual of
Engineering Practice depending on actual construction cost of the project.
The fee is based on a total budget for the project of $250,000.
The Engineer shall endeavor to design the project within the approved budget
and if, at the time of receiving bids, the bids are above the approved budget
the City shall have the right to require the engineer to revise the plans in
order to reduce the cost of an additional fee.
The City will not pay the engineer for fees as a result of change
orders resulting from negligence of the engineer.
The fee for services for Items 2 -A, 2 -B, and 2 -C to be due and pay-
able as follows (said services above listed)
A. In the Preliminary Phase: (For work authorized by the City)
For services rendered under the preliminary phase as described
above 20% of the basic fee. Approval of the preliminary
engineering plahs will be required before payment.
B. In the Design Phase (For work as authorized by the City):
For services rendered under the design phase, as described above,
an amount equal to 65% of the basic fee for work authorized by
the City shall be due and payable. In the event that proposals for
constructions on the work are received after submission of complete
contract plans and specifications to the City, the fee for services
rendered for the preliminary and design phases of this portion of
the work shall be adjusted to the "Construction Cost" as reflected
by the lowest bona fide bid. Where no proposals are received within
the period of 120 days from the date of approval, then the engineer's
estimates shall be the basis for final payment for services rendered
under the preliminary and design phases.
C. Construction Phase:
For services rendered under the construction phase, as described
above, an amount equal to 15%'of the basic fee for those portions
of the work covered by construction contracts shall be due and
payable based on monthly estimates of work performed by the contractor.
4. Termination of Contract.
The City may at any time, with or without cause, terminate this
contract. In the event the engineer shall be compensated for his service on all
stages authorized as follows:
A. If termination occurs prior to the final completion and approval
of the drawings and specifications, the engineer shall be paid a
reasonable compensation for the services actually rendered by
him in accordance with the above described schedule of fees and
in proportion to the amount of work done on such stage or phase
as have been authorized.
B. If termination occurs after final completion and approval of the
drawings and specifications, the fee of the engineer shall be
50% of the basic fee based on engineer's construction estimate
submitted with the design phase and approved by the City, plus
the fee paid for the preliminary phase.
C. If termination occurs after the letting of the contract, but
prior to final completion or acceptance by the City, the fees
of the engineer shall be computed in accordance with the provisions
0
C7
of Paragraphs 3 and 4 of this contract to the date of termination.
D. The foregoing shall not be construed to require the City to compen-
sate the Engineer for any services not performed in a proper.profes-
sional manner suitable for use in the construction of the project
contemplated by the parties to this agreement.
5. Ownership.of Documents.
Upon completion of the project or upon termination of this contract
if previously terminated the Engineer shall furnish to the City, in a suitable
container for filing, "As Built" Plans, reproduced on linen or plastic draft-
ing film from the original drawings, together with a correct and legible set
of specifications.
6. Assignability.
The Engineer shall not assign, transfer or delegate any of his
obligations or duties in this contract to any other person without the prior
written consent of the City, except for routine duties delegated to personnel
of the Engineer's staff. If the Engineer is a partnership, in the event of
the termination of the partnership, this contract shall inure to the individual
benefit of such partner or partners as the City,may designate. No part of the
engineer's fee may be assigned in advance of receipt by the engineer without
written consent of the City.
7. Technical Assistance and Consultations.
The City shall not pay the fees of expert or technical assistance
and consultants unless such employment, including the rate of compensation, has
been approved in writing by the City.
Executed in duplicate, each of which shall be considered an original,
this day of
ATTEST
City Secretary
APPROVED a ldl ;
? Day of,�� , 1973
Ci N Att p'rn�6�'
y ,
Director of Finance
1973•
THE CITY OF CORPUS CHRISTI
BY
R. Marvin Townsend, City Manager
MAVERICK ENGINEERING COMPANY
BY
CORPUS CHRISTI, TEXAS
DAY or �%%1. -G�. 19
TO THE MEMBERS OF THE CITY COUNCIL
CORPUS CHRISTI, TEXAS ,
FOR THE REASONS SET FORTH IN THE EMERGENCY CLAUSE OF THE FOREGOING
ORDINANCE, A PUBLIC EMERGENCY AND, IMPERATIVE NECESSITY EXIST FOR THE SUSPEN-
SION OF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE OR RESOLUTION SHALL
BE PASSED FINALLY ON THE DATE IT IS INTRODUCED, AND THAT SUCH ORDINANCE OR
RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY COUNCIL; I, THEREFORE,
REQUEST THAT YOU SUSPEND SAID CHARTER RULE OR REQUIREMENT AND PASS THIS ORDI-
NANCE FINALLY ON THE DATE IT IS INTRODUCED, OR AT THE PRESENT MEETING OF THE
CITY COUNCIL.
' RESPECT LLY, -
MAYOR
THE CITY OF COR S RISTI,. TEXAS
THE CHARTER RULE WAS SUSPENDED 8Y Ti1E.FgLLOWING VOTE:
RONNIE SIZEMORE
_.CHARLES A. BONNIWELL/ / / / / / /�'
ROBERTO BQSQUEZ) M.D.
REV. HAROLD T. BRANCH
THOMAS V. GONZALES
- - GABE LOZANO, SR. (f- lyyeyw .
.. - J. HOWARD STARK
THE ABOVE ORDINANCE WAS PASSED BY THE FOLLOWING VOTE:'
RONNIE SIZEMORE
CHARLES A. BONNIWELL ✓/. QI��i
ky ^ _ R08ERT0 BOSQUEZ, M.D.
( 'REV. HAROLD T. BRANCH
' THOMAS V. GONZALES
GABE LOZANO, SR.
J: HOWARD STARK