HomeMy WebLinkAbout12796 RES - 09/10/1975jkh:9- 10 -75; lst A RESOLUTION ADOPTING A PRELIMINARY PROJECT SCHEDULE IN CONNECTION WITH EACH OF THE FOUR SANITARY SEWER PROJECTS AS FOLLOWS: 1. Oso Treatment Plant System, WPC -TEX =1214, 2. Flour Bluff System, WPC -TEX -1215, 3., Broadway Treatment Plant System., WPC - :TEX -1216, and 4. Westside Treatment Plant System, WPC- TEX -1217, A COPY OF EACH SCHEDULE BEING ATTACHED HERETO, MARKED EXHIBITS "A", "B ", "C ", AND "D ", RESPECTIVELY, AND MADE A PART HEREOF, SAID PROJECT SCHEDULES BEING REQUIRED IN CONNECTION WITH THE SUBMISSION OF GRANT APPLICATIONS FOR FINANCIAL ASSISTANCE UNDER THE FEDERAL WATER POLLU- TION CONTROL ACT AMENDMENT OF 1972, PUBLIC LAW NO. 92 -500; AND DECLARING AN EMERGENCY. BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. There is hereby adopted a preliminary project schedule in connection with each of the four sanitary sewer projects as follows: 1. Oso Treatment Plant System, WPC -TEX -1214, 2. Flour Bluff System, WPC -TEX -1215, 3. Broadway Treatment Plant System, WPC- TEX - 121.6, and 4. Westside Treatment Plant System, WPC -TEX -1217, a copy of each schedule being attached hereto, marked Exhibits "A ", "B ", "C ", and "D ", respectively, and made a part hereof, said project schedules being required in connection with the submission of grant applications for financial assistance under the Federal Water Pollution Control Act Amendment of 1972, Public Law No. 92 -500. SECTION 2. The necessity to adopt the preliminary project schedule in connection with the aforesaid sanitary sewer projects, as required in connection with the submission of grant applications as aforesaid, creates a public emergency and an imperative public necessity requiring the suspen- sion of the Charter rule that no ordinance or resolution shall be passed finally on the date of its introduction but that such ordinance or resolu- tion shall be read at three several meetings of the City Council, and the Mayor having declared such emergency and necessity -to exist, and having /a7 q( requested the suspension of the Charter rule and that this ordinance be passed finally on the date of its introduction and take effect and be in full force and effect from and after its passage, IT IS ACCORDINGLY SO RESOLVED, this the &1�day of September, 1975. ATTEST: �ys t MAYOR THE CITY OF CORPUS CHRISTI, TEXAS MDAP VED: DAY OF SEPTEMBER, 1975: City Attorney i OSo SYSTEM 4I11C -TEX -1214 General Information Date Availability of applicant's Step 1- Sept. 1974 share of project costs Step 2 Sept. Step 3 FThen needed Availability of ,site (s) for July 1976 project facilities Project Schedule Item Calendar nays step 1 A. Infiltration /Inflow Analysis (with Evaluation Survey Plan of Study if required). Report completed & submitted to State 300 days after. stop 1 grant award. B.� Infiltration /Inflow Evaluation Survey (if required) Report completed & submitted to State 300 days after grant amendment for Survey - C.' Environmental Assessment (including time for draft report, advertisement, & hearing) Final report completed & submitted to State_ 54o days after Step 1 grant alloard_ D. Facility Plan Report completed & submitted to State -24o days after EPA approval of S/i Analysis & I/I Survey (if , required). Step 2 Final Flans and Specifications completed and submitted to State 210 days. after Step 2 grant" aL ard. X/-(, "/� Step 3 Advertise for Construction Bids within the days indicated after authorization to advertise for bids has been issued Submit Bid Opening Documents i•:ithin the days indicated after the bid opening date Award of Construction Contract within the days indicated after authorization to award the contract has been issued Initiation of construction within the days indicated after the award of the contract Complete Construction - within'the days indicated after initiation of construction 30 days 14 days 14 days 30' days 730 days IFLDUR BLUFF SYSTMI WPC -TEX -1215 General Information Date Availability of applicant's Step I. Sept. 1974 share of project costs Step 2 When needed Step 3 When needed Availability of,site(s) for project facilities Immediately Project Schedule Item. Calendar Days Step 1 A. Infiltration /Inflow Analysis (with Evaluation Survey Plan of Study if required). Report completed & submitted to State 21D clays after Step I grant award. (Actually submitted 8/18/75) 13 -� Infiltration /Inflow Evaluation -- - Survey (if required) Report completed & submitted to State go days after grant amendment for Survey. C_' Environmental Assessment lincluding time for draft report, advertisement, & hearing) Final report completed & submitted to State 16o days after Step 1 grant award_ D. Facility Plan Report completed & submitted to State 150 days after EPA approval of I/I Analysis & I/I Survey (if required). Step 2 Final Plans and Specifications completed and submitted to State i8o days after Step 2 grant' award. Step 3 Advertise for Construction Bids _within the days indicated after authorization to advertise for bids has been issued Submit Bid Opening Documents within the days indicated after the bid opening date Award of Construction Contract within the days indicated after authorization to award the contract has been issued Initiation of Construction within the days indicated after the award of the contract Complete Construction within'the days indicated after initiation of construction 9 30 days 14 days 14 days 30- days 450 days BROADWAY SYSTEM WPC -TEX -1216 General Information Date Availability of applicant's step 1 Sept. 1974 share of project costs Step 2 Sept. 197 Step 3 Sept. 197+ Availability of,site(s) for project facilities July 1976 Project Schedule Item Calendar Days Step 1 A. Infi-.ltration /Inflow Analysis (with Evaluation Survey Plan of Study if required). Report completed & submitted to State 240 clays after Step I. grant award. • (Actually submitted 8/7/75) B. Infiltration /Inflow Evaluation Survey (if required) Report completed & submitted to State 365 days after grant amendment for Survey. C. Environmental Assessment (including time for draft report, advertisement, & hearing) -Final report completed & submitted to State 45o days after Step 1 grant award. D. Facility Plan - Report completed & submitted to State 210 days after EPA approval of I/I Analysis '& I/I Survey (if , required)_ Step 2 Final Flans and Specifications completed and submitted to State 330 days. after Step 2 grant' award. hx /j �„ Step 3 Advertise for Construction Bids within the days indicated after authorization to advertise for bids has been issued Submit Bid Opening Documents within the clays indicated after the bid opening date Award of Construction Contract within the days indicated after authorization to award the contract has been issued initiation of Construction within the,days indicated after the award of the contract Complete Construction within *the days indicated after initiation of construction 30 days 14 days 14 days 30 • days 550 days WESTSIDE SYSTEM WPC-TEX -1217 General Information Date Availability of applicant's Step 1 Sept, 1974 share of project costs Step 2 When needed Step,3 When needed -}availability of .site (s) for Immediate (Existing site) project facilities Project Schedule Item Calendar nays Step 1 A. Infiltration /Inflow Analysis (with Evaluation Survey Plan of Study if required). Report completed & submitted to State 240 days after. Step 3. grant award. (Actually submitted 8/7/75) T3.~ Infiltration /Inflow Evaluation Survey (if required) Report completed & submitted to State 365 days after grant amendment for Survey. C.', Environmental Assessment (including time for draft report, advertisement, & hearing) Final report completed & submitted to State 450 days after Step 1 grant award. • D. _ Facility Plan Report completed & submitted to State 210 days after EPA approval of I/I Analysis & I/I Survey (if , required)_ Step 2 Final Plans and Specifications completed and submitted to State 300 days after Step 2 grant' award. Step 3. Advertise for Construction Bids within the days indicated after authorization to advertise for bids has been issued Submit Bid Opening Documents within the days indicated after the bid opening date Award of Construction Contract within the days indicated after authorization to award the contract has been issued initiation of construction within the days indicated after the award of the contract Complete Construction within the days indicated after initiation of construction 30 days 14 days 14 days 30- days 450 days CORPUS CHRISTI TEXAS ILL- OF �9L TO THE MIEM3ERS OF THE CITY COUNCIL CORPUS CHRISTI TEXAS FOR THE REASONS SET FORTH IN THE EMERGENCY CLAUSE OF THE FOREGOING ORDINANCES A PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST FOR THE SUSPEN- SION OF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE IT IS INTRODUCED, AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY COUNCILS I, THEREFORE, REQUEST THAT YOU SUSPEND SAID CHARTER RULE OR REQUIREMENT AND PASS THIS ORDI- NANCE FINALLY ON THE DATE IT IS INTRODUCED, OR AT THE PRESENT MEETING OF THE CITY COUNCIL. RESPECTFULLY ` I MAYOR CITY OF CORPUS CHRISTI, TEX S THE CHARTER RULE WAS SUSPENDED BY THE FOLLOWING VOTE: JASON LUBY OR. BILL TIPTON EDUARDO DE ASES aL RUTH GILL BOB GULLEY GABE LOZANO, SR. EDWARD L. SAMPLE THE ABOVE ORDINANCE WAS PASSED BY THE 9LLOWING VOTE: ` JASON LUBY - - - -t�� - DR. BILL TIPTON - EDUARDO DE ASES RUTH GILL - BOB `GULLEY __- - -5�_'f GABE LOZAN O, SR. EDWARD L. SAMPLE