HomeMy WebLinkAbout14253 ORD - 04/05/1978JKH:hb:4 /4/78
AN ORDINANCE
AUTHORIZING THE CITY MANAGER TO EXECUTE AN AGREEMENT
WITH TRINITY ENGINEERING TESTING CORPORATION TO PRO-
VIDE LABORATORY TESTING AND SOIL INVESTIGATION ON THE
OSO WASTEWATER TREATMENT PLANT PROJECT, A SUBSTANTIAL
COPY OF WHICH IS ATTACHED HERETO AND MADE A PART HERE-
OF, MARKED EXHIBIT "A "; APPROPRIATING $7,078 FROM THE
NO. 250 SANITARY SEWER BOND FUND FOR SAID SERVICES
APPLICABLE TO PROJECT NO. 250 -77 -4, OSO PLANT IMPROVE-
MENTS; AND DECLARING AN EMERGENCY. `
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS:
SECTION 1. That the City Manager be and he is hereby authorized
to execute an agreement with Trinity Engineering Testing Corporation to
provide laboratory testing and soil investigation on the Oso Wastewater
Plant, a substantial copy of which is attached hereto and made a part hereof,
Marked Exhibit "A ", said services applicable to Project No. 250 -77 -4, Oso
Plant Improvements.
SECTION 2. That there is hereby appropriated the sum of $7,078
from the No. 250 Sanitary Sewer Bond Fund to provide laboratory testing and
soil investigation on the Oso Wastewater Treatment Plant project, applicable
to Project No. 250 -77 -4, Oso Plant Improvements.
SECTION 3. The necessity to execute the aforesaid agreement and
tb appropriate the sums hereinabove set out at the earliest possible date so
that testing may be commenced without delay, creates a public emergency
and an imperative public necessity requiring the suspension of the Charter
rule that no ordinance or resolution shall be passed finally on the date of
its introduction but that such ordinance or resolution shall be read at three
several meetings of the City Council, and the Mayor having declared such
emergency and necessity to exist, and having requested the suspension of
the Charter rule and that this ordinance be passed finally on the date of
its introduction and take effect and be in full force and effect from and e
after its passage, IT IS ACCORDINGLY SO ORDAINED, this the .5- day of April,
1978.
ATTEST:
C' y Secretary MAYOR
THE CITY 0 RPUS CHRISTI, TEXAS
APPROVED:_DAY OF APRIL, 1978:
J. RUC AYCOC CITY ATTORNEY MICROFILMED
By ssis ant torte ney 34253 3Ut 01 19BO
TRINITY ENGINEERING TESTING CORPORATION
3601 MANOR ROAD P. 0. BOX 572 AUSTIN. TEXAS 78767 512/926.6650
March 14, 1978
Mr. Chuck Urban
Urban Engineering
P. 0. Box 6355
Corpus Christi, Texas
Reference: Subsurface Investigations - Contract Nos. 3 and 5
Oso Wastewater Treatment Plant Improvements
Corpus Christi, Texas
Dear Mr. Urban:
This letter and attachments reflects the scope of services and estimated cost
for providing a subsurface investigation for the above referenced projects.
I have reviewed all the information provided concerning the various improve-
ments including the plant effluent lines, lift stations, and the major plant
structures. I essentially agree with your recommended boring locations and
depths with only minor changes in the boring depths in the plant area as con-
firmed with Mike Carrell of your office. For convenience, the specific bor-
ings and proposed depths are summarized below:
Contract No. 3
B19
Airline Rd. 0 Wooldridge
35.0'
B20
Wooldridge Dr. @ Co. Rd. & 13
35.0'
B21
Manhole B -5 - '
35.0'
B22
Co. Rd. #13 @ "Saratoga Rd.
30.0'
B23
Saratoga Rd. •
12.0'
B24
Saratoga Rd. @'S. Staples
12.0'
B25
Lift Station #5
50.0'
B26
Saratoga Rd. @•Long Meadow
12.0'
B27
Saratoga Rd. @•Everhart
25.0'
B28
Everhart
25.0'
Core Drilling Sub -Total = 271.0 l.f.
Contract No. 5
B29
Emergency Pump Station
45.0'
B30
6+00 Effluent Line
16.0'
B31
14 +00 Effluent Line
16.0'
B32
West Plant Structure
30.0'
B33
West Plant Structure
30.0'
B34
Control House
30.0'
B35
East'Plant Structure
30.0'
B36
East-Plant Structure
30.0'
Core Drilling Sub -Total = 227.0 l.f.
e NATIONAL SOCIETY OF PROFESSIONAL ENGINEERS AMERICAN SOCIETY FOR TESTING AND MATERIALS AMERICAN WELDING SOCIETY AMERICAN CONCRETE INSTITUTE
Mr. Chuck Urban
March 14, 1978
Page 2
Groundwater observations will be made in all the borings prior to the use
of drilling fluid to aid in the drilling operation. To provide additional
long -term groundwater observations, we propose to install perforated P.V.C.
pipe in three of the core borings, one at lift station 05 and two at the
major plant structures. This information could prove to be valuable to
your designs.
The subsurface materials will be visually classified and described. Atter-
berg Limits tests and minus 200 mesh sieve tests will also be conducted on
a limited basis to aid in these classifications. Strength evaluations will
be made through'either unconfined compression tests of cohesive soils or
standard penetration tests in granular soils. For proposal purposes, one
strength test for each five feet of core drilling has been included. The
only other laboratory tests which could be required are consolidation tests
for evaluation of compressibility characteristics of cohesive soils.
The results of the field and laboratory investigations will be used by our
geotechnical engineer to provide soil characteristics and properties required
for the final design of the various plant structures. We will coordinate
these studies with your personnel to provide specific recommendations that
you may require in your design.
All the information obtained, including our foundation recommendations, will
be presented in a formal report. The estimated cost of this scope of ser-
vices is $7,078.00 as itemized on the attached Professional Services Estimate
sheets. These estimates were made for contract no. 3 and no. 5 separately for
your benefit.
We look forward to working with you. If you have any questions concerning this
proposal, please feel free to call me.
Sincerely,
TRINITY ENGIINEERING TESTING CORPORATION
QrP/1k / l..'6mtZ4
Robert C. Davis, Ph.D.,P.E.
Geotechnical Engineering Division
xc: Robert C. White
TETCO- Corpus Christi
RCD /ft
March 14_19 7P
. ,
FESSIONAL SERVICES ESTIMATE FOR: ' SUBSURFACE INVES'CTGA'1'ION
CONTRACT NO. 3 - OSO 14ASTEI4ATER TREATMENT PLANT
SERVICE
QUANTITY
UNIT PRICE
TOTAL
Mobilization
200 miles
$ 1.50
$ 300.00
Core Drilling and Sampling (Boring Nos.
19 through 28)
271.0 l.f.
7.50
2,032.50
Observation Pipe Installation
0 Lift Station #5 '
L.S.
L.S.
50.00
Atterberg Limits Tests
4
25.00
100.00
Minus 200 blesh Sieve Tests
8
12.00
96.00
Unconfined Compression Tests and /or
Field Penetration Tests
55
13.50
742.50
Consolidation Test
1
100.00
100.00
Engineering Studies 1 -1/2 days 250.00 375.00
We estimate that these services will cost approximately $-! 796-01 . This cost includes
our regular fees for the basic services listed above. Variations from the outlined program,
including additions or deletions, will be adjusied at our regular fees.
In the case of core borings, the client is to provide right -of -entry on property and truck
Access to boring locations.
Respectfully submitted,
Accepted by: Trinity Engineering Testing Corporation
Robert C. Davis, Pli.D., P.E.
Geotechnicat Engineering Division
F— )FESSIONAL SERVICES ESTIMATE FOR:
CONTRACT NO. 5 - OSO WASTEWATER TREATMENT
March 14
SUBSURFACE INVESTIGATION -
PLANT
lg 7
SERVICE
QUANTITY
UNIT PRICE
TOTAL
Mobilization (included on Contract No. 3)
- - - -
- - - _
_ _
Core Drilling and Sampling (Boring Nos.
_
29 through 36)
227.0 l.f.
$ 7.50
$1,702.50
Observation Pipe Installation @ Major
Plant Structures
2
50.00
100.00
Atterberg Limits Tests
3
25.00
75.00
Minus 200 Mesh Sieve Tests
6
12.00
72.00
Unconfined Compression Tests and /or
Field Penetration Tests
45
13.50
607.50
Consolidation Tests
2
100.00
200.00
Engineering Studies
1 -1/2 days
250.00
375.00
Report Preparation (Drafting, Typing
and Reproduction)
10 hours
15.00
150.00
We estimate that these services will cost approximately $ 32 282.00 . This cost includes
our regular fees for the basic services listed above. Variations from the outlined program,
including additions or deletions, will be adjusted at our regular fees.
In the case of core borings, the client is to provide right -of -entry on property and truck
access to boring locations.
Accepted by:
Respectfully submitted,
Trinity Engineering Testing Corporation
BY-240 _6
Robert C. Davis, Ph.D.,P.E.
Geotechnical I ?ngineering Division
Corpus Christi, Texas
S day of 4a6-� 19 -71P
TO THE MEMBERS OF THE CITY COUNCIL
Corpus Christi, Texas
For the reasons set forth in the emergency clause of the foregoing ordinance,
a public emergency and imperative necessity exist for the suspension of the
Charter rule or requirement that no ordinance or resolution shall be passed
finally on the date it is introduced, and that such ordinance or resolution
shall be read at three meetings of the City Council; I, therefore, request
that you suspend said Charter rule or requirement and pass this ordinance
finally on the date it is introduced, or at the present meeting of the City
Council.
Respectfully,
OR
THE CI Y OF UUS CHRISTI, TEXAS
The Charter Rule was suspended
Gabe Lozano, Sr.
Bob Gulley
David Diaz
Ruth Gill
Joe Holt
Tony Juarez, Jr.
Edward L. Sample
The above ordinance was passed
Gabe Lozano, Sr.
Bob Gulley
David Diaz
Ruth Gill
Joe Holt
Tony Juarez, Jr.
Edward L. Sample
:e:
14253
:e:
CITY OF CORPUS CHRISTI TEXAS
` CERTIFICATION OF FUNDS
(City Charter Article IV Section 21)
April 5, 1978
I certify to the City Council that $ 7,078 , the amount required
for the contract, agreement, obligation or expenditures contemplated in the
above and foregoing ordinance is in the Treasury of the City of Corpus Christi
to the credit of:
Fund No. and Name 250 Sanitary Sewer Bond Fund
Project No. - 250 -77 -4
Project Name Oso Plant Improvements
from which it is proposed to be drawn, and such money is not appropriated for
any other purpose.
5;1977'
Director of Finance
/1 FIN 2 -55
Revised 7/31/69