Loading...
HomeMy WebLinkAbout14410 ORD - 08/02/1978KH:vp:8 /l /78.:lst AN ORDINANCE AUTHORIZING SUBMISSION OF A GRANT APPLICATION FOR A PAVEMENT MARKING DEMONSTRATION PROJECT TO THE STATE DEPARTMENT OF HIGHWAYS AND PUBLIC TRANSPORTATION FOR THE INSTALLATION OF SEMI PERMANENT ROADWAY MARKING MATERIALS ON FIFTEEN CITY STREETS, ALL AS MORE FULLY SET FORTH IN THE GRANT APPLICATION, A SUBSTANTIAL COPY OF WHICH IS ATTACHED HERETO AND MADE A PART HERE- OF, MARKED EXHIBIT "A "; AUTHORIZING THE CITY MANAGER TO EXECUTE ALL NECESSARY AGREEMENTS WITH THE STATE DEPARTMENT OF HIGHWAYS AND PUBLIC TRANSPORTATION PRO - VIDING FOR THE DEVELOPMENT AND COMPLETION OF SAID s PROJECT; AND DECLARING AN EMERGENCY. WHEREAS, the State Department of Highways and Public Transportation has determined that there is a need to develop a demonstration program in the State in the area of pavement marking for traffic safety and control; and WHEREAS, the City of Corpus Christi agrees with the State Department of Highways and Public Transportation that development and implementation of a Pavement Marking Demonstration Program in Corpus Christi would be an improve- ment to traffic safety; and WHEREAS, the Federal Government has made funds available through the Federal Highway Administration to finance 100% of the costs for developing and implementing pavement marking projects; and WHEREAS, the State Department of Highways and Public Transportation agrees to undertake a Pavement Marking Demonstration Program for Corpus Christi using Federal Highway funds; NOW, THEREFORE, BE IT RESOLVED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. That the City of Corpus Christi submit a grant applica- tion to the State Department of Highways and Public Transportation for assist- ance in developing and implementing a Pavement Marking Demonstration Program involving fifteen city streets. SECTION 2. That the City Manager be and he is hereby authorized to execute agreements with the State Department of Highways and Public Trans- portation providing for development and completion of the aforesaid project. SECTION 3. The necessity to develop and implement a pavement marking demonstration program in Corpus Christi to improve traffic control and safety on fifteen city streets creates a public emergency and an imperative U 0EN ED,. -inI. O 8 X910 34410 public necessity requiring the suspension of the Charter rule that no ordinance or resolution shall be passed finally on the date of its introduction but that such ordinance or resolution shall be read at three several meetings of the City Council, and the Mayor having declared such emergency and necessity to exist, and having requested the suspension of the Charter rule and that this ordinance be passed finally on the date of its introduction and take effect and be in full force and effect from and after its passage, IT IS ACCORDINGLY SO ORDAINED, this the day of August, 1978. ATTEST: 42 City- secretary THEOCITY OVC CHRISTI, TEXAS APPROVED: I DAY OF AUGUST, 1978: J. BRUCE AYCOCK, CITY ATTORNEY BY: Assistant Ci ttorney e'z• :i�r � �+k i'.i 'X :' R.: :: ��.: ,���:5. ?'.. .. v1F'.'. '' �•5_� Rj•X''S�::i4i.' - -_ .s �M.Y.y -�" • .aL�ti.: -' - 1�:. erg ..2] '.fin. �, y� _ F - -�r:� da;R».�.,^ �.o .tri p., -;.i ._ - _ T,i ,k _ _ _, _ s- PROJECT PROPOSAL PAVEMENT MARKING DEMONSTRATION TO DEMONSTRATE THE VALUE OF PAVEMENT MARKINGS IN PROVIDING GREATER VEHICLE AND PEDESTRIAN SAFETY, THE CITY OF CORPUS CHRISTI, TEXAS, REQUESTS APPLICATION. AND ASSISTANCE TO IMPLEMENT A PAVEMENT MARKING DEMONSTRATION PROGRAM ON ITS CITY STREETS UNDER THE GUIDE- LINES OF TITLE 23, CODE OF FEDERAL REGULATIONS, SUBCHAPTER V, PART 920. THE PROJECT PROPOSAL INCLUDES FIFTEEN OF'CORPUS CHRISTI'S ARTERIAL STREETS. AS A CRITERIA FOR SELECTING THE PROPOSED ROADWAY SECTIONS, CALCULATIONS WERE PERFORMED TO DETERMINE A ROADWAYS ROUTE SECTION ACCIDENT RATE PER HUNDRED MILLION VEHICLE MILES (HMVM). THOSE ROUTE SECTIONS HAVING AN ACCIDENT RATE WHICH EXCEEDED (DURING THE 1977 CALENDAR YEAR) NATIONAL AVERAGE ROUTE SECTION ACCIDENT RATES ON SPECIFIC TYPE CLASSIFICATION OF HIGHWAYS WERE CHOSEN AS APPLICANTS FOR IMPROVED ROADWAY MARKINGS. EMPHASIS WAS PLACED ON THOSE ARTERIALS WHICH HAD A HIGH INCIDENCE OF ACCIDENTS EXHIBITING TRENDS OF SIDE -SWIPE COLLISIONS OF MOVING AND PARKED VEHICLES AND INCORRECT LANE USAGE FOR TURNING MANEUVERS. THE FIFTEEN ROUTE SECTIONS CHOSEN CURRENTLY HAVE GLASS-BEAD REFLECTORIZED PAINTED ROADWAY MARKINGS WHICH MUST BE RENEWED ON A SEMI- ANNUAL TO ANNUAL TIME BASIS. AT EACH ROUTE SECTION, IT IS PROPOSED THAT HEAT- APPLIED REFLECTIVE THERMOPLASTIC BE USED TO REPLACE EXISTING PAINTED LANE MARKINGS, CENTERLINE MARKINGS, AND CENTER DOUBLE LEFT TURN LANE MARKINGS. IN CERTAIN APPLICABLE CASES, THERMOPLASTIC MATERIAL IS ALSO PROPOSED FOR USE TO EDGELINE THE ROADWAY SECTIONS AT LOCATIONS WHERE NO EDGELINING CURRENTLY EXISTS, AND WOULD ALSO BE USED TO OUTLINE CURRENTLY UNMARKED PARKING LANES. IN EACH OF THE ABOVE CASES, RAISED, -Al REFLECTIVE LANE MARKERS WOULD BE USED TO SUPPLEMENT THE THERMOPLASTIC MATERIAL FOR IMPROVED NIGHTTIME VISION. FINALLY, PREFORMED THERMO- PLASTIC IS PROPOSED TO MARK STOP BARS AND CROSSWALKS AT INTERSECTIONS AND MIDBLOCK LOCATIONS WHERE NO SUCH MARKINGS CURRENTLY EXIST, BUT WHERE NEED OF SUCH HAS DEFINITELY BEEN DETERMINED, AND TO MARK PAVEMENT MESSAGES TO DtNOTE'PERMISSIBLE TURNING MANEUVERS IN ADVANCE OF INTER- SECTIONS. TYPICAL ILLUSTRATIONS ARE PROVIDED AT THE END OF THIS NARRATI SHOWING EACH TYPE MARKED PROPOSED FOR USE AND IN WHAT TYPE APPLICATION. IN NO CASE, ARE PAVEMENT MARKINGS PROPOSED TO RENEW EXISTING SAME TYPE MARKINGS. ALL EXISTING AND NEW PROPOSED MARKINGS CONFORM TO THE STANDARDS SET FORTH IN THE M.U.T.C.D. THE INTENDED PURPOSE OF PROVIDING THE HIGHER TYPE OF PAVEMENT MARKING IS TO PROVIDE A HIGHER DEGREE OF SAFETY TO MOTORISTS AND PEDESTRIAN TRAFFIC. DUE TO THE LONGER LIFETIME -OF THE PROPOSED IMPROVEMENTS, SAFETY BENEFITS WILL BE DERIVED THROUGH IMPROVED PRO- LONGED VISIBILITY, BOTH DURING THE DAYTIME AND NIGHTTIME.- IN ADDITION, THE ELEVATED CHARACTERISTIC OBTAINED THROUGH THE USE 'OF RAISED REFLEC- TIVE MARKERS WILL INCREASE THE VISIBILITY OF THE TRAVELED LANES DURING DARKENED WET WEATHER CONDITIONS. INCREASED SAFETY TO MAINTENANCE CREWS AND CONVENIENCE TO THE DRIVING PUBLIC WILL ALSO BE DERIVED SINCE THE CREWS WILL.NOT HAVE TO MAINTAIN THE MARKINGS ON A FREQUENT BASIS AS IS NOW ENCOUNTERED 'IN RESTRIPING PAINTED MARKINGS. LOCATIONS NOT . CURRENTLY HAVING EDGELINING, WHERE SUCH MARKINGS WILL BE IMPLEMENTED, WILL ALSO OBTAIN SAFER DRIVING CONDITIONS BY CLEARLY OUTLINING THE TRAVEABLE PATHS AND DELINEATING SHARP DROPOFFS. FOLLOWING IMPLEMENTA- TION OF THE PROPOSED IMPROVEMENTS, DATA COLLECTION, ANALYSIS AND EVALUATION ACTIVITIES WILL BE MADE TO DOCUMENT THE ANTICIPATED REDUCTION IN ACCIDENTS. - 2 - 43- t'7, 'V 4, FOLLOWING THIS DISCUSSION, THE FOLLOWING INFORMATION WILL BE PROVIDED: A.) CODED CITY METROPOLITAN MAP TO DENOTE THE ROUTE SECTIONS PROPOSED FOR IMPLEMENTATION OF THE IMPROVEMENTS PREVIOUSLY DISCUSSED. B.) TYPICAL PLANS ILLUSTRATING EACH TYPE OF MARKING TO BE USED. C. COST ESTIMATE BY TYPE OF MARKING. D.) LIST OF ROUTE SECTION BY NAME WITH QUANTITY OF EACH TYPE OF MARKING. 4 '• iET NAME: Avers Si. , LIMITS: Ocean Dr. to Padre TS1and Dr. (7301 -502) 4" Yellow 42164 Lengtn (Mi.): .3.7 1977 Property Damage Only Accidents: 153• A.D.T. (vpd): 13671 1977 Injury Accidents: 39 1977 Daytime Accidents: 109 Number of Injuries: 50 1977'Nighttime Accidents: 83 1977 Fatality Accidents: 0 (7302 -507) Double Turn No. of Fatalities:' 0 Accident Rate: 1040.0 HMVM Injury Accident Rate: 211.2 HM Fatality Accident Rate: 0 HMVM (752 -508) 4" Amber Single Severity Accident Rate: 1462.3 HMVM (Based on No_ of Accidents) ea x 1.80195/ea = Severity Accident Rate: 1641.1 HHVM (Based on No. of Injuries) 2,142 Material Estimate Heat•.Applied Thermoplastic (Reflective (7301 -501) 4" White 15221 ft. x $ 0.36609/ft = $ 5.572 (7301 -502) 4" Yellow 42164 ft. x 0.42885/ft - 18.082 (7301 -507) 6" White 420 ft. x 0.83185/ft = 349 Pre - Formed Cold Thermoplastic (Reflective) (7302 -501) 12" White 3564 ft. x 4.15872/ft = 14:822 (7302 -502) Turn Arrows 10 ea. x 120.09709/ea = �:20i ' (7302 -503) Word - "ONLY" 10 ea x 206.66667/ea = 2.067 (7302 -507) Double Turn ' Arrow ea x 227.87879/ea = .Raised Reflective Markers (752 -506) 4" Clear Single ' Reflective 1,194 ea x 1.90383/ea - 2,273 (752 -508) 4" Amber Single .Reflective ea x 1.80195/ea = (752 -507) 4" Amber Double 1,129 ea x 1.89756/ea - 2,142 Reflective • Total - Material _ Estimate $ 46,508 Cost Estimate -Type Marking Length (Mi) -Cost Per Mi Total . Broken White Stripe 7.22 $ 839.49 $ 6,061 ...Solid Double Yellow Centerline 1.64 ..5.196.63 8,522 Yellow Dash Centerline 933.09 Center Double Left Turn Lane 1.83 • 6,395.09 11,703 Yellow Solid Median Edgeline 2,581.43 White Solid Shoulder Edgeline 59 2,268.08 1,338 White Solid Parking Lane - -1 32.94 445 - -Solid White Lane Marking 1,933.33 Turn Bay Lane Channelization Marking �— 49.91/ea + 349 Stop Bars 149.72/ea 8,833 Crosswalks 12 499:05 ea 5,989 Thermoplastic Pavement Arrow Markings �0— 32 83 ea 3,268 Total - Type Marking Estimate $ 46,90R STREET NAME: Baldwin Blvd LIMITS: Agnes St. to Staples St Lt,-_a (Mi.): 2.85 1977 Property Damage Only Accidents: 55 A.D.T. (vpd): 12899 Injury Accidents: 1977 Daytime Accidents: 22 1977 Nighttime Accidents: Number of Injuries: 30 1977 Fatality Accidents: 0 No- of Fatalities: 0 A ccident Rate: 574.2 Injury Accident Rate: - -i64� —'� Fatality Accident Rate: — 0--"FK Severity Accident Rate: 902,4 Severity Accident Rate: 108— 1.4 HH� (Based on No. of Accidents) HMVM (Based on No. of Injuries) Material Estimate Heat Applied Thermoplastic (Reflective) (7301 -501) 4" White 23044 ft. x $ 0.36609/ft = $ _9,436 (7301 -502) 4" Yellow 295568 ft, x 0.42885/ft 12,680 (7301 -507) 6" White 42_0 _ft, x 0,83185/ft Pre - Formed Cold Thermoplastic (Reflective) 349 �T' (7302 -501) 12" White 1728 ft. x- 4.15872/ft (7302 -502) Turn Arrows 8 ea. x 120.09709/ea a 7 186 (7302 -503) Word - "ONLY" ` 961 (7302 -507) Double Turn 8-- -� x 206.66667/ea Arrow ea x 227.87879/ea = Raised Reflective Markers (752 -506) 4" Clear Single Reflective 842 ea x 1.90383/ea = (752 -508) 4" Amber Single Reflective ea x 1.80195/ea = (752 -507) 4" Amber Double 986 ea x 1.89756/ea Reflective' Tot-al-- ,ater stimate 1,871 Cost Estimate ;;,_e Ma U9 Broken White Stripe rking $ _14 ,7 Length (Mi) Cost Per Mi Total 5.58 Solid Double Yellow Centerline $ 839.49 $ ., Yellow Dash Centerline 2.80 5,196.63 1451 Center Double Left Turn Lane 933'09 Yellow Solid Median Edgeline 6.395.09 White Solid Shoulder Edgeline ?.581,43 White Solid Parking Lane• 2 268.08 Solid White Lane Marking 2'77 1,932.94 x,354 Turn Bay Lane Channelization Marking. 1 933.33 Stop Bars 7 49,91/ea Crosswalks 28 149,72/ea 4,192 Thermoplastic Pavement Arrow Markings $ 499.05/ea 2.994 326,83/ea 2,614 Total - Type Marking Estimate $ _REET NAME: '. Doddridge LIMITS: Ocean Dr. to Staples St Length (Mi..): 1.02 1977 Property Damage Only Accidents: 15 A.D.T. (vpd): 11290 1977 Injury Accidents: 7 1977 Daytime Accidents: 17 Number of Injuries: 9 1977 Nighttime Accidents: 5, 1977 Fatality Accidents: 0 No. of Fatalities: 0 Accident Rate:. 498.9 HMVM Injury Accident Rate: 158.8 HMVM Fatality Accident Rate: 0 HMVM Severity Accident Rate: 816.5 HMVM (Based on No. of Accidents) Severity Accident Rate: 952.5 HMVM (Based on No. of- Injuries) Material Estimate Heat Applied Thermoplastic (Reflective) ` (7301 -501) 4" White 4933 ft. x $ 0.36609/ft - $ 1,806 (7301 -502) 4" Yellow 10032 ft. x 0.42885/ft = 4,302 (7301 -507) 6" White 300 ft. x 0.83185/ft = 250 Pre - Formed Cold Thermoplastic (Reflective) (7302 -501) 12" White 336 ft. x 4.158721£t = 1,397 (7302 -502) Turn Arrows 8 ea. x 120.09709/ea = 961 (7302 -503) Word - "ONLY" 8 ea x 206.66667/ea = 1,653 (7302 -507) Double Turn Arrow ea x 227.87879/ea - Raised Reflective Markers (7.52 -506) 4" Clear Single • Reflective 272 ea x 1.90383/ea - 518 (752 -508) 4" Amber Single Reflective ea x 1.80195 /ea = (752 -507) 4" Amber Double 334 ea x 1.89756/ea = 634 Reflective .Total - Material Estimate $ 11,521 Cost Estimate - Type Marking Length (Mi) Cost Per Mi Total Broken White Stripe 1.8 $ 839.49 $ 1,511 Solid Double Yellow Centerline .95 5.196.63 4,937 Yellow Dash Centerline 933.09 Center Double Left Turn Lane 6.395.09 Yellow Solid Median Edgelin e 2,581.43 White Solid Shoulder Edgeline 2,268.08 White-Solid Parking Lane .42 1,932.94 812 Solid White Lane Marking 1,933.33 Turn Bay Lane Channelization Marking 5 49.91/ea 250 Stop Bars 6 149.72/ea 898 Crosswalks 1 499.05/ea 499 Thermoplastic Pavement Arrow Markings 8 326.83/ea 2,614 Total - Type Marking Estimate 11,521 :ET NAME: Ennis Joslia Rd. LIMITS: Carson St. to Padre Island Dr. . Length (Hi.): 2.04 1977 Property Damage Only Accidents: 11 A.D.T. (vpd): 6180 1977 Injury Accidents: 10 1977 Daytime Accidents: 12 Number of Injuries: 12 1977 Nighttime Accidents: 9 1977 Fatality Accidents: 0 (7302 -503) Word - "ONLY" No, of Fatalities: 0 Accident Rate: 456.4 HMVM Injury Accident Rate: 260.9 HMVM Fatality Accident Rate: HMVM Severity Accident Rate: — 891-0 —HMVM (Based on No. of Accidents) Severity Accident Rate: 1021.4 HMVM (Based on No. o£ Injuries) Material Estimate Heat Applied Thermoplastic (Reflective (7301 -501) 4" White 20486 ft. x $ 0.36609/ft $ 7,500 (7301 -502) 4" Yellow 2987 ft. x 0.42885/ft m 1, (7301 -507) 6" White ft. x 0.83185/ft = Pre - Formed Cold Thermoplastic (Reflective) (7302 -501) 12" White 108 ft. x 4.15872/ft 449' (7302 -502) Turn Arrows ea. x 120.09709/ea a (7302 -503) Word - "ONLY" ea x 206.66667/ea a (7302 -507) Double Turn . Arrow ea x 227.87879/ea a Raised Reflective Markers '(752 -506) 4" Clear Single Reflective 683 ea x - 1.90383/ea - 1,300 (752 -508) 4" Amber Single Reflective ea x 1.801951ea = - (752 -507•) 4" Amber Double 299 ea x 1.89756/ea - 567. Reflective • Total - Material Estimate $ 11.097 Cost Estimate - Type Marking Length (iii) Cost Per Mi Total Broken White Stripe $ 839.49 $ Solid Double Yellow Centerline -- 5,196.63 Yellow Dash Centerline 1.98 933.09 1,848 Center Double Left Turn Lane 6,395.09 Yellow Solid Median Edgeline 2,581.43 White Solid Shoulder Edgeline 3.88 2,268.08 White Solid Parking Lane- 1,932.94 _8,800 Solid White Lane Marking 1,933.33 Turn Bay Lane Channelization Marking 49.91/ea' Stop Bars 3 149.72/ea 449 Crosswalks 499.05/ea Thermoplastic Pavement Arrow Markings Total - Type Marking Estimate $ 11 nn7 1EET NAME: 'Everhart LIMITS: Center'St. to Saratoga Blvd. Length (Mi.): 3.46 1977 Property Damage Only Accidents: 118 A.D.T. (vpd): 15215 1977 Injury Accidents: 15 1977 Daytime Accidents: 107 Number of Injuries: 21 •1977 Nighttime Accidents: 26 1977 Fatality Accidents: 0 No. of Fatalities: 0 -Accident Rate: 696.2 HMVM Injury Accident Rate: 78.5 HMVM Fatality Accident Rate: 0 HMVM Severity Accident Rate: 853.3 HMVM (Based on No_ of Accidents) Severity Accident Rate: 947.5 HMVM (Based on No. of Injuries) Material Estimate Heit.Applied Thermoplastic (Reflective) (7301 -501) 4" White . 9987 ft. x $ 0.36609/ft $ 3,656 (7301 -502) 4" Yellow 38588 ft. x 0.42885/ft _16,549 (7301 -507) 6" White 480 ft. x 0.83185/ft 399 Pre- Formed Cold Thermoplastic (Reflective) (7302 -501) 12" White 2400 ft. x 4.15872/ft = 9,981 .(7302 -502) Turn Arrows 10 ea. x 120.09709/ea -1,201 (7302 -503) Word - 'ONLY" 10 ea x 206.66667/ea = 2,067 (7302 -507) Double Turn Arrow ea x 227.87879/ea = Raised Reflective Markers (752 -506) 4" Clear Single Reflective 914 ea x 1.90383/ea = 1740 (752 -508) 4" Amber Single Reflective ea x 1.80195/ea = (752 -507) 4" Amber - Double 1184 ea x 1.89756/ea - 2247 Reflective • Total - Material Estimate $ _ 37.840 Cost Estimate - Type Marking Length (M-i) Cost Per Mi Total Broken White Stripe 6.06 $ 839.49 $ 5,087 Solid Double Yellow Centerline. 2,78 5,196.63 14,447 Yellow Dash Centerline 933.09 Center Double Left Turn Lane .68 6,395.09 4,349 _Yellow Solid Median Edgeli.ne 2,581.43 White Solid Shoulder Edgeline 2,268.08 White Solid Parking Lane- 1,932.94 Solid White Lane Marking .16 1,933.33 309 Turn Bay Lane Channelization Marking 8 49.91/ea $92 Stop Bars 40 . 149.72/ea 5989 Crosswalks 8 499.05/ea 3992 Thermoplastic Pavement Arrow Markings 10 326.83/ea 3268 Total - Type Marking Estimate $ 37,840 STREET NAME: Holly Rd. LIMITS: Ayers St. to Rodd Field Rd. - 6.14 1977 Property Damage Only Accidents: 18 A.D.T. (vpd): 3,223 1977 Injury Accidents: 1977 Daytime Accidents: 11 Number.of Injuries: 11 1977 Nighttime Accidents: 114 1977 Fatality Accidents: 0 No, of Fatalities: 0 Accident Rate: 332.3 HMVM Injury Accident Rate: 83.1 HMVM Fatality Accident Rate: 0.0 HMVM Severity Accident Rate: 498.4 HMVM (Based on No. of Accidents) Severity Accident Rate: 206.1 HMVM (Based on No: of Injuries) Material Estimate Heat Applied Thermoplastic (Reflective (7301 -501) 4" White 63,096 ft. x.$ 0.36609/ft = $ (7301 -502) 4" Yellow 9,187 ft. x 0.42885/ft - (7301 -507) 6" White ft. x 0.831851ft =. .Pre - Formed Cold Thermoplastic (Reflective) $ 839.49 $ (7302 -501) 12" White 528 ft. x- 4,15872/ft m (7302 -502) Turn Arrows ea. x 120.09709/ea -_ (7302 -503) Word - "ONLY" ea x 206.66667/ea = (7302 -507) Double Turn 2,581.43 Arrow ea x'227-.87879/ea = Raised Reflective Markers (752 -506) 4" Clear Single Reflective 2,103 ea x - 1.90383/ea = (752 -508) 4" Amber Single 23,099 T3,940 2.196 4,003 Reflective ea x 1.80195/ea = (752 -507) 4" Amber Double 919 ea x 1.89756 1,744 Ref lectiverotal - Material Estimate .Cost Estimate - Type Marking Length (Mi) Cost Per Mi Total .Broken White Stripe $ 839.49 $ Solid Double Yellow Centerline 5,196.63 Yellow Dash Centerline 6.09 _ 933.09 5.682 Center Double Left Turn Lane - 6,395.09 Yellow Solid Median Edgeline 2,581.43 White Solid Shoulder Edgeline 11.95 2,268.08 _ 27,104 White Solid Parking Lane 1,932.94 Solid White Lane Marking 1,933.33 Turn Bay Lane Channelization Marking 49*.91/ea Stop Bars .8 ea 149.72/ea 1,198 Crosswalks 2 ea - 499.05/ea 998 Thermoplastic Pavement Arrow Markings Total - Type Marking Estimate $ 34,982 GREET NAME : 'Kostoryz Rd. LIMITS: Staples St. to Padre Island D? .Length (Mi.): 1.97 1977 Property Damage Only Accidents: 48 A.D.T. (vpd): 12,077 1977 Injury Accidents: 13 1977 Daytime Accidents: 43 Number of Injuries: 18 1977 Nighttime Accidents: 18 1977 Fatality Accidents: 0 No. of Fatalities: p Accident Rate: 702.4 HMVM Injury Accident Rate: 149.7 HMVM 'Fatality Accident Rate: 0 HMVM Severity Accident Rate: 1001.8. HMVM (Based on No. of Accidents) Severity Accident Rate: 3.174.6 HMVM (Based on No. of Injuries)- .•Piaterial Estimate Heat Applied Thermoplastic (Reflective) (7301 -501) 4" White 6035 ft. x $ 0.36609/ft - .$ 2,209 (7301 -502) 4" Yellow .20803 ft. x 0.42885/ft - 8,921 (7301 -507) 6" White 120 ft. x 0.83185/ft - 100 Pre - Formed Cold Thermoplastic (Reflective) (7302 -501) 12" White 936 ft. x 4.15872/ft - 3.893 (7302 -502) Turn Arrows 4 ea. x 120.09709/ea - 480 '(7302 -503) Word - 'ONLY" 4 ea x 206.66667/ea - 827 (7302 -507) Double Tura. Arrow ea x 227.87879/ea = Raised Reflective Markers' (752 -506) 4" Clear Single Reflective 5 ea x - 1.90383/ea = 199 (752 -508) 4" Amber Single Reflective ea x 1.80195 /ea = (752 -507) 4" Amber Double 693 ea -x 1.89756/ea - 1,315 Total Material stimate $ 18.874 Cost Estimate - Type Marking Length (Mi) Cost Per Mi •' Total ' Broken White Stripe 3.93 $ 839.49 $ 3.299 -Solid Double Yellow Centerline 1.97 5.196.63 10.237 T Yellow Dash Centerline 933.09 Center Double Left Turn Lane 6,395.09 Yellow Solid Median Edgeline 2,581.43 White Solid Shoulder Edgeline 2.268.08 White Solid Parking Lane • 1.932.94 Solid White Lane Marking .02 1,933.33 39 Turn Bay Lane Channelization Marking 2 49.91/ea 100 Stop Bars 16 149.72/ea 2395 Crosswalks 3 499.05/ea 1497 Thermoplastic Pavement Arrow Markings 4 326.83/ea 1307 Total - Type Marking Estimate $ 18,874 TREET NAME:• Leopard Street Length (Mi.): 15.08 A.D.T. (vpd): 11,290 1977 Daytime Accidents: 110 1977 Nighttime Accidents: 49 LIMITS: Broadway to Up River Road (Ra, _d Crossing; 1977 Property Damage Only Accidents: 120 1977 Injury Accidents: 31 Number of Injuries: 47 1977 Fatality Accidents: 8 No. of Fatalities: 8 Accident Rate: 255.8 HMVM (752 -506) 4" Clear Single 4.03 Injury Accident Rate: 49.8 HMVM 7,734 ea x 1.90383/ea = (752 -508) Fatality Accident Rate: 12.8 HMVM 2,85 Reflective 3,143 Severity Accident Rate:' 497.2 HMVM (Based on No. of Accidents) Crosswalks Severity Accident Rate: 574.4 HMVM (Based on No. of Injuries) Material Estimate - teri stimate Heat Applied Thermoplastic (Reflective) (7301 -501) 4" White 158.920 ft. x $ 0.36609/ft - $ 58,179 (7301 -502) 4" Yellow 148,670 ft. x 0.42885/ft = .63,757 (7301 -507) 6" White 1,260 ft. x 0.83185/£t = 1,048 Pre - Formed Cold Thermoplastic (Reflective) (7302 -501) 12" White 3.696 ft. x 4.15872/ft - 15.371 (7302 -502) Turn Arrows 21 ea. x 120.09709/ea - 2,522 '(7302 -503) Word - "ONLY" 21 ea x 206.66667/ea = —74,340 (7302 -507) Double Turn Arrow' ea x 227.87879/ea = Raised Reflective Markers Length (Mi) -Broken White Stripe (752 -506) 4" Clear Single 4.03 Yellow Dash Centerline Reflective 7,734 ea x 1.90383/ea = (752 -508) 4" Amber Single 20.10 White Solid Parking Lane • 2,85 Reflective 3,143 ea ' x 1.80195/ea = (752 -507) 4" AWbir Double 66 ea Crosswalks 11 ea e ective 2 132 ea x 1.89756/ea = Total - teri stimate Cost Estimate :.Type Marking Length (Mi) -Broken White Stripe 25.02 Solid-Double Yellow Centerline 4.03 Yellow Dash Centerline Center Double Left Turn Lane .87 Yellow Solid Median Edgeline White Solid Shoulder Edgeline 20.10 White Solid Parking Lane • 2,85 Solid White Lane Marking Turn Bay Lane Channelization Marking 21 ea Stop Bars 66 ea Crosswalks 11 ea Thermoplastic Pavement Arrow Markings 21 sets `Leopard St. (Bdwy. to Palm) - Reflective Markers Total - Type Marking,Estimate 14,724 5,664 4,046 Cost *Per Mi Total 839.49 $ 21,004 5,196.63 20,942• 933.09 6,395.09 5,564 2,581.43 46,104 2,268.08 45,588 1,932.94 51509 . 1,933.33 49.91/ea 1,048 149.72/ea 9,881 499.05 ea 5,490 326.83 set 6,862 1,659 . $ 169,651 *This quantity is estimated to cover the cost of supplementing the existing thermoplastic lane markings with raised reflective markers. .:EET NAIM- ' Morgan Ave. LIMITS: Ocean Dr. to Airport' Rd. Length (Mi.): 2.75 1977 Property Damage Only Accidents: 78 A.D.T. (vpd): 8847 1977 Injury Accidents: 14 1977 Daytime Accidents:. 68 Number of Injuries: 24 1977 Nighttime Accidents: 26 1977 Fatality Accidents: 1 No, of Fatalities: 1 Accident Rate: 1,058.5 MWM Injury Accident Rate: 146.T —11.2 HMVM —MVM Fatality Accident Rate:.' Severity Accident Rate:. l,4_-jZ.0 MWM (Based on No. of Accidents) Severity Accident Rate: 1,824.2 HMVM (Based on No. of Injuries) Material Estimate Heat Applied Thermoplastic (Reflective) (7-301-501)'4" White 18933 ft. x $ 0.36609/ft - (7301 -502) 4" Yellow 28195 ft. x 0.42885/ft - 12,091 (7301 -507) 6" White 360 ft. x 0.831851ft = 299 Pre- Formed Cold Thermoplastic (Reflective) (7302 -501) 12" White 2364 ft. x 4.15872/ft = , 9,831 (7302 -502) Turn Arrows 6 ea. x 120.09709/ea = 721 "-(7302 -503) Word - "ONLY" 6 ea x 206.66667/ea = 1,240 (7302 -507) Double Turn Arrow ea x 227.87879/ea = Raised- Reflective Markers (752 -506) 4" Clear Single Reflective 806 ea x 1.90383/ea = (752 -508) 4" Amber Single . Reflective• ea x 1.80195/ea = (752 -507) 4" Amber Double 940 ea x 1.89756/ea = 1,784 Reflective Total - Material Estimate $ _ 34,431 Cost Estimate - Type Marking Length (Mi) Cost Per Mi - Total - Broken White Stripe 5.34 $ 839.49 $ 4.483 Solid Double Yellow Centerline 2.67 5,196.63 .13,875 Yellow Dash Centerline 933.09 Center Double Left Turn Lane 6,395.09 Yellow Solid Median Edgeline - 2,581.43 White Solid Shoulder Edgeline 2,268.08 -- White Solid Parking Lane 2.06 1,932.94 3,982 Solid White Lane Marking 1,933.33 Turn Bay Lane Chanuelization Marking 6 49.91/ea 299 Stop Bars 39 149.72/ea 5,839 -Crosswalks 8 499.05/ea 3.992 Thermoplastic Pavement Arrow Markings 6 326.83 1,961 Total - Type Marking Estimate $ 14 J'31 Ocean Drive LIMITS: Buford St. to Alameda St. 'REET NAME: Length (Mi.): 5.92 Solid Double Yellow Centerline 1977 Property Damage Only Accidents: J8 A.D.T. (vpd): 21,239 1977 Injury Accidents: 41 1977 Daytime Accidents: 73 White Solid Parking Lane Number of Injuries: 54 1977 Nighttime Accidents: _T 266 17 ea 1977 Fatality Accidents: 1 Crosswalks 5 ea Thermoplastic Pavement Arrow Markings No. of Fatalities: 1 Accident Rate: 302.8 HMVM Injury Accident Rate: 87-111MV11 _ Fatality Accident Rate: 2.1 HMVM Severity Accident Rate: 501.1 HMVM (Based on No. of Accidents) Severity Accident Rate:• 592.6 HM. (Based on No. og Injuries) Material Estimate -Heat Applied Thermoplastic (Reflective) (7301 -501) 4" white - 75,293 ft. x $ 0.36609/ft - $ 27,564 (7301 -502) 4" Yellow '� =ft. x 0.42885/ft = 24,477 (7301 -507) 6" White 1,020 ft. x 0.83185/ft - 848 Pre - Formed Cold Thermoplastic (Reflective) (7302 -501) 12" White 1,356 ft. x 4.15872/ft - 5,639 (7302 -502) Turn Arrows- 21 ea. x 120.097091ea = __ per, (7302 -503) word - "ONLY" 21 ea x 206.66667/ea. - 4.340 (7302 -507) Double Turn Arrow ea x 227.87879/ea = .Raised Reflective Markers (752 -506) 4" Clear Single Reflective 1,985 ea x 1.90383/ea '_ 3,779 (752 -508) 4" Amber Single Reflective 1,903 ea x 1.80195/ea 3,429 Total - Material Estimate Cost Estimate - Type Mar�kinA Length (Mi)_ Broken White Stripe 13.16 Solid Double Yellow Centerline Total Yellow'Dash Centerline '11,048 Center Double Left Turn Lane Yellow Solid Median Edgeline 10. White Solid Shoulder Edgeline White Solid Parking Lane 10.50 Solid White Lane Marking Turn Bay Lane Channelization Marking 17 ea Stop Bars 21 ea Crosswalks 5 ea Thermoplastic Pavement Arrow Markings 21 sets Total - Type Marking Estimate $ 72,598 Cost Per Mi Total $ 839.49 $ '11,048 5,196.63 933.09 6,395.09 2,581.43 27,905 2,268.08 1,932.94 20.296 1,933.33 49.91/ea 848 149.72/ea 3,144 499.05/ea 2,495 6,862 326, 83 /set 72,598 STREET NAME: Poyj• &ve. (S) LIMITS: Agnes St • to Ayers Sr _ ath (Mi..): 2,78 1977 Property Damage Only Accidents: 56 A.D.T. (vpd): 11,100 1977 Injury Accidents: ^ 3 1977 Daytime Accidents: 34 Number of Injuries: 77 1977 Nighttime Accidents: 35 1977 Fatality Accidents: 0 No. of Fatalities: �0 Accident Rate: 612.7 HMVM Injury Accident Rate: •115.4 HUM Fatality Accident Rate: 0 HMVM Severity Accident Rate: 843.6 HMVM (Based on No. of Accidents) Severity Accident Rate: 950.2 ERVM (Based on No, of Injuries) Material Estimate Heat Applied Thermoplastic (Reflective (7301 -501) 4" White 17635 ft. x'$ 0.36609/ft (7301 -502) 4" Yellow 29764 ft. x 0.42885/ft (7301 -507) 6" White 480 ft. x 0.83185/ft Pre - Formed Cold Thermoplastic (Reflective) 933.09 (7302 -501) 12" White 888 ft. x 4.15872/ft (7302 -502) Turn Arrows 8 ea. x 120.09709/ea (7302 -503) Word - 'ONLY" - 8 ea x 206.66667/ea (7302 -507) Double Turn White Solid Parking Lane 2.40 1,932.94 ' Arrow 'Solid White Lane Marking ea .x 227.87879/ea Raised Reflective Markers Turn Bay Lane Channelization Marking 8 _1,933.33 49.91/ea ,(752 =506) A" Clear Single Stop Bars - 18 149.72/ea . - Reflective 497 ea x 1- 90383/ea (752 -508) 4" Amber Single Thermoplastic Pavement Arrow Markings 8 326.83/ea Reflective 67 ea x 1.80195/ea (752 -507). 4" Amber Double, 80 ea x 1.89756/ea Reflective •.- Total - Material Estimate Cost Estimate - Type Marking a $ 6.456 12.764 399 946 121 1,526 - $ 28,519 Total - Type Marking Estimate 28,519 Length (Mi.) Cost Per Mi Total Broken White Stripe - 3.29 $ 839.49 $ "29762 Solid Double Yellow Centerline 1.60 5,196.63 8,315 Yellow Dash Centerline- -- 933.09 'Center Double Left Turn Lane �0"—� - 6,395.09 5,116 Yellow Solid Median Edgeline .38 2,581.43 981 'White Solid Shoulder Edgeline 2,268.08 - White Solid Parking Lane 2.40 1,932.94 4,639 'Solid White Lane Marking Turn Bay Lane Channelization Marking 8 _1,933.33 49.91/ea 399 Stop Bars - 18 149.72/ea 2,695 Crosswalks' 2 499.05/ea 998 Thermoplastic Pavement Arrow Markings 8 326.83/ea 2,614 Total - Type Marking Estimate 28,519 .MEET NAME; Sfioreliue Dr. (N & S) LIMITS: Buford St. 'to Hughes Street Length (Mi.): 2.01 Solid Double Yellow Centerline 1977 Property Damage Only Accidents: 48 A.D.T. (vpd): 21,272 Yellow Solid Median Edgeline 1977 Injury Accidents: White Solid Shoulder Edgeline 12 1977 Daytime Accidents: 32 .Solid White Lane Marking Number of Injuries: Turn Bay Lane Channelization Marking 20 1977 Nighttime Accidents: 28 Crosswalks 1977 Fatality Accidents: Thermoplastic Pavement Arrow Markings 0 No. of Fatalities: 0 Accident Rate: 384.46 HMVM Injury'Accident Rate: 76.8 HMVM Fatality Accident Rate: 0.0 HMVM Accident Rate: 538,2 EM (Based on No. of Accidents) .Severity Severity Accident Rate:, 692.3 HMVM (Based on No. of Injuries) -Material_ Estimate Heat Applied Thermoplastic (Reflective) (7301 -501) 4" White 14,059 ft. x $ 0.36609/ft $ 5,147 (7301 -502) 4" Yellow 10,138 ft. x 0.42885/ft = 4,347 (7301 -507) 6" White 60 ft. x 0.83185/ft = 50 Pre- Formed Cold Thermoplastic (Reflective) (7302 -501) 12" White 492 ft. x 4.15872/ft =• 2,046 (7302 -502) Turn Arrows 11 ea. x 120.09709/ea 1,321 (7302 -503) Word - 'ONLY" 11 ea x 206.66667/ea 2,273 (7302 -507) Double Turn , Arrow ea x 227.87879/ea. Raised Reflective Markers = -(752 -506) 4" Clear Single Reflective 572 ea x - 1.90383/ea 1,089 '(752 -508) -4" Amber Single • . Reflective 338 ea x 1.80195/ea = 609 Total - Material Estimate Cost Estimate - Type Mares Length (Mi) Broken.White Stripe 3.79 Solid Double Yellow Centerline Yellow Dash Centerline Center Double Left Turn Lane Yellow Solid Median Edgeline 1.92 ' White Solid Shoulder Edgeline White•Solid Parking Lane 1.58 .Solid White Lane Marking Turn Bay Lane Channelization Marking 1 ea Stop Bars .7 ea Crosswalks 2 ea Thermoplastic Pavement Arrow Markings 11 sets Total - Type Marking Estimat $ - 16,882 . Cost Per Mi Total $ 839.49 $ 33182 5,196.63 933.09 6,395.09 2,581.43 4,956 2,268.08 1,932.94 3,054 1,933.33 49.91/ea 50 149.72/ea 1,048 499.05/e 998 326.83 set 3,594 e $ 16,882 ' STREET•NAME: Staples St. (S) LIMITS: Musset St.' t�o Padre Island Dr, Le..sth (Mi.): 6.49 1977 Property Damage Only Accidents: X63 A.D.T. (vpd): X58-- 1977 Injury Accidents: 46 1977 Daytime Accidents: 174— Number of Injuries: 1977 Nighttime Accidents: ---- 57— 1977 Fatality Accidents: No. of Fatalities: Accident Bate: 643.5 HMVM 'Injury Accident Rate: 126.3 HPNM Fatality Accident Rate: 5.4 HMVM Severity Accident Rate: 947.6 HMVM (Based on No. of Accidents) Severity Accident Rate: 1096.10 HMVM (Based on No. of Injuries) Material Estimate Heat A 1• d Th 1 i pp ie ermop as t c Reflective) 32693 Revlective • Total - Material Estimate (7301 -501) 4" White 31982 ft, x $ 0.36609/ft = (7301 -502) 4" Yellow 77118 ft, x 0.42885/ft _ (7301 -507) 6" White 1560 ft. x 0.83185/ft = Pre - Formed Cold Thermoplastic (Reflective) 10,289 (7302 -501) 12" White 2712 ft. x 4.15872/ft = (7302 -502) Turn Arrows 27 ea. x 120.09709/ea = (7302 -503) Word - "ONLY" 27 ea x 206.66667/ea = (7302 -507) Double Turn 2.46 1,932.94 __4,755 Solid White Lane Marking Arrow 1,933.33 ea x 227- 87879/ea, _ Raised Reflective Markers 49.91/ea 1,298 Stop Bars (752 -506) 4" Clear•Single 149.72/ea 7,785 Crosswalks 7 Reflective 1899 ea x 1.90383/ea = (752 -508) 4" Amber Single 8,823 Reflective $ 11,708 33,072 1.298 11,278 3,243 5,580 3,615 (752 -507) 4" Amber Double. 1946 ea x 1.801951ea = . ea x 1.89756/ea - 32693 Revlective • Total - Material Estimate $ 73,487 Cost Estimate - Type Marking .Per 4 Length (Mi) Cost Mi Total Broken White Stripe 12.59 $ 839.49 $ 10,569 Solid Double Yellow Centerline 1.98 5,196.63 10,289 Yellow Dash Centerline 933.09 Center Double Left Turn Lane 4:14: 6,395.09 26,475 Yellow Solid Median Edgeline 2,581.43 White Solid Shoulder Edgeline 2,268.08 - White Solid Parking Lane - 2.46 1,932.94 __4,755 Solid White Lane Marking 1,933.33 Turn Bay Lane Channelization Marking 26 49.91/ea 1,298 Stop Bars 52. 149.72/ea 7,785 Crosswalks 7 499.05 ea 3,493 Thermoplastic Pavement Arrow Markings 27 326.83 ea 8,823 Total - Type Marking Estimate $ 73,487 STREET NAME:. Third St. Length (Mi.): A.D.T. (-pd): 1977 Daytime Accidents: 1977 Nighttime Accidents: Accident Rate: Injury Accident Rate: Fatality Accident Rate: Severity Accident Rate: Severity Accident Rate: LIMITS: Del Mar Blvd-:- to Hancock St;•• •77 1977 Property Damage Only Accidents: 28 5490 '1977 Injury Accidents: 2 28 Number of Injuries: 2 2 1977 Fatality Accidents: 0 No. of Fatalities: 0 1944.3 HMVM 129.6 - HMVM 0 HMVM 2203.6 HMVM (Based on No. of Accidents) 2203.6 HMVM (Based on No_ of Injuries) Material Estimate Heat Applied Thermoplastic (Reflective) (7301 -501) 4" White 4805 ft. x $ 0.36609/ft $ 1_759 (7301 -502) 4" Yellow ft. x 0.42885/ft = •(7301 -507) 6" White ft. x 0.83I85/ft = Pre- Formed Cold Thermoplastic (Reflective) (7302 -501) 12" White 72 ft. x 4.15872/ft (7302 -502) Turn Arrows 2 ea- x,120.09709/ea = 299 -• 240 (7302 -503) Word - ONLY 6 ea x 206.66667/ea 1 240 (7302 -507) Double Turn .= — Arrow 4 ea x 227.87879/ea 912 Raised Reflective Markers (752 -506) 4" Clear Single , Reflective - (752 -508) 4" Amber Single 292 ea x 1.90383/ea 442 Reflective ea x 1.80195 /ea = Total - Material Estimate Cost Estimate - Tvpe Marking • Length (Mi) Broken White Stripe 1.54 Solid Double Yellow Centerline Yellow Dash Centerline Center Double Left-Turn Lane, Yellow Solid Median Edgeline White Solid Shoulder Edgeline White Solid Parking Lane- Solid White Lane Marking Turn Bay Lane Channelization Marking Stop Bars 2 Crosswalks Thermoplastic Pavement Arrow Markings 6 Total - Type Marking Estimate Cost Per Mi Total $ 839.49 $ ]�g3 5,196.63 933.09 6,395.09 2,581.43 2,268.08 1,932.94 _ 908 _1,933.33 49.91/ea 149.72/ea 299 499.05/ea 398.67 9,392 $ 4,892 IEET NAME: Weber Rd. LIMITS: Staples St. Xo Sa;atoRa Blvd. Length (Mi.): .3.20• 1977 Property-Damage Only Accidents: 103 A.D.T. (vpd): 18,326 1977 Injury Accidents: 20 --- 20 1977 Daytime Accidents: 92 Number of Injuries: 1977 Nighttime Accidents: 31 1977 Fatality Accidents: 0 No. of Fatalities: 0 Accident Rate: 574.6 tQ Injury Accident Rate: 93.4HI Fatality Accident Rate: 0 OMB Severity Accident Rate: 761.5 HMVM (Based on No. of Accidents) severity Accident Rate: 873.6 HMVM (Based on No. of Injuries) Material Estimate Heat Applied Thermoplastic (Reflective) (7301 -501) 4" White 12808 ft. x $ 0.36609/ft - $ 4.689 (7301 -502) 4" Yellow 40264 ft. x 0.42885/ft = 17,267. (7301 -507) 6" White 600, ft. x 0.831851ft = 499 Pre - Formed Cold Thermoplastic (Reflective) (7302 -501) 12" White 1044- ft. x 4.15872/ft = 4,342 (7302 -502) Turn Arrows _ ' 10. ea. x 120.09709/ea - 1,201 (7302 -503) Word - 'ONLY" 10 ea x 206.66667/ea 2,067 (7302 -507) Double Turn Arrow ea x 227.87879/ea = Raised Reflective Markers '(752 -506) 4 1I.Clear Single ,,- Reflective 879 ea x 1.903831ea = -1,673 (752 -508) 4" Amber Single . Reflective ea x 1.80195 /ea = (752 -507) _4" Amber Double 940 ea " x 1.89756/ea = 1,784 Reflective Total - Material Estimate $ 33,522 Cost. Estimate - Type Marking Length (Mi) Cost Per Mi Total Broken White Stripe 5.83 $ 839.49 $ 4,894 Solid Double-Yellow Centerline- -.38 _ 5.196.63 •1,975 Yellow Dash Centerline 933.09 Center Double Left Turn Lane 2.67 6,395_09 17,075 Yellow Solid Median.Edgeline 2,581.43 White Solid Shoulder Edgeline 2,268.08 White Solid Parking Lane .76 1,932.94 1,469 Solid White Lane Marking 1.933.33 Turn Bay Lane Channelization Marking 10 49.91/ea 499 -Stop Bars 19. 149.72/ea 2,845 Crosswalks 3 499.05/ea 1,497 Thermoplastic Pavement Arrow Markings 10 326.83/ea 3,268 Total - Type Marking Estimate $ aa,599 PAVEMENT MARKING DEMONSTRATION PROJECT APPLICANTS AND COSTS NOTE: COSTS SHOWN REFLECT ESTIMATED MATERIAL, LABOR AND INSTALLATION. ROUTE SECTION LENGTH �MI.1 ACCIDENT -RATE TOTAL COST (PER HMVM) COST PER MILE AYERS STREET 3.70 1,040,0 46,508.00 12,570.00 BALDWIN BLVD, 2.85 574.2 34,739.00 12,189.00 DODDRIDGE 1.02 .498.9 11,521.00 11,295.00 ENNIS JOSLIN 2.04 456.4 11,097.00 5,440.00 EVERHART ROAD 3.46 696.2 37,840.00 10,936.00 HOLLY ROAD 6.14 332.3 34,982.00 5,697.00 KOSTORYZ ROAD 1.97 702.4 18,874.00 9,581.00 LEOPARD STREET 15.08 255.8 169,651.00 11,250.00 MORGAN AVENUE 2.75 1,058.5 34,431.00 12,520.00 OCEAN DRIVE 5.92 302.8 72,598.00 12,263.00 PORT AVENUE 2.78 612.7 28,519.00 10,259.00 SHORELINE DR. 2.01 384.4 16,882.00 8,399.00 STAPLES ST. 6.49 643.5 73,487.00 11,323.00 THIRD ST. 0.77 1,944.3 4,892.00 6,353.00 WEBER RD. 3.20 574.6 33,522.00 10,475.00 TOTAL 60.18 $ 629,543.00 AVERAGE 671.8 $ 10,461.00 NOTE: COSTS SHOWN REFLECT ESTIMATED MATERIAL, LABOR AND INSTALLATION. PAVEMENT MARKING DEMONSTRATION COST ESTIMATE - TYPE MATERIAL HEAT APPLIED THERMOPLASTIC (REFLECTIVE): (7301 -501) 4 -INCH (WHITE) - 477,237 FT. x $ 0.36609/FT = $ 174,712 (7301 - 502)•4 -INCH (YELLOW)- 544,556/FT. x 0.42885/FT.= 233,533 (7301 -507) 6-INCH (WHITE) - 7,080.FT. x 0.83185/FT. =' 5,889 SUBTOTAL _ $ 414,134 PREFORMED COLD THERMOPLASTIC (REFLECTIVE); (7302- 501)12-INCH (WHITE) - 22,224 FT. X 4.15872/FT.= 92,422 . (7302 -502) TURN ARROWS - 146 EA. X 120.09709/EA.= 17,534 (7302 -503) WORD (ONLY) - 150 EA. x 206.66667/EA.= 31,000 (7302 -507) DOUBLE TURN ARROWS - 4 EA. X 227.87879/EA.= 912 SUB -TOTAL $ 141,868 RAISED REFLECTIVE PAVEMENT MARKERS: (752-506)-4-;NCH CLEAR - SINGLE REFLECTIVE) - 21,204 EA. X 1.90383/EA.= 40,369 (752 -508) 4-INCH AMBER SINGLE (REFLECTIVE) - 5,450 EA. X 1.80195/EA.= 9,821 (752 -507) 4 -INCH AMBER DOUBLE (REFLECTIVE) - 12,306 EA. X 1.89756/EA.= 23,351 SUB -TOTAL $ 73,541 GRAND TOTAL $ 629,543 FAVLMENT MARKING DEMONSTRATION -TYPICAL" PLANS --- Turn Bay Lane Markings r 10 �I 4" WHITE HEAT APPLIED REFLECTIVE THERMOPLASTIC - B' ❑ D O D. Y 4" AMBER 2/WAY REFLECTIVE MARKERS ❑ c - ❑ 30' i 10' 4° YELLOW HEAT APPLIED REFLECTIVE THERMOPLASTIC ❑ \ 5' f 4 CLEAR 1 /WAY REFLECTIVE MARKERS �' i • r• 6" WHITE HEAT APPLIED REFLECTIVE THERMOPLASTIC 12 WHITE PREFORMED COLD THERMOPLASTIC (REFLECTIVE) _7� PAVEMENT MARKING DEMONSTRATION TYPICAL PLANS- One-way, Three Lanes 2 White Stripe w/I Parking Lane a I Median Edg elin e 4 �- 4 AMBER 1 /WAY REFLECTIVE MARKER 30' �~ "�- 4° YELLOW HEAT APPLIED THERMOPLASTIC (REFLECTIVE) El 35' 4" CLEAR I/WAY REFLECTIVE MARKER 4 WHITE HEAT APPLIED REFLECTIVE THERMOPLASTIC PAVEMENT MARKING DEMONSTRATION. -TYPICAL PLANS-- Two-way, Four Lane Double Solid 'Yellow w/2 Broken White Stripes& 2 Parking Lanes 4" WHITE HEAT APPLIED REFLECTIVE THERMOPLASTIC MARKING i - 35' F_ ❑ ❑ ❑ 30, 4 -" YELLOW HEATAPPLIED REFLECTIVE THERMOPLASTI.0 MARKING a 1:1 0 ri ❑ ri El 0-3 13 10, 0 4!' CLEAR I/WAY REFLECTIVE MARKER t 4 WHITE HEAT APPLIED REFLECTIVE THERMOPLASTIC MARKING 11 PAVEMENT MARKING DEMONSTRATION TYPICAL • PLANS -- Two —way, Four Lane Divided 2 Broken White Stripes w!2 Parking Lane & 2 Median Edgeline B, 4 CLEAR VWAY REFLECTIVE MARKERS 4 WHITE HEAT APPLIED REFLECTIVE THERMOPLASTIC c_-4" AMBER I /WAY REFLECTIVE � �-•4 -- 30' � ❑ ❑ • - � � MARKERS �j MEDIAN p ❑ ❑ 0 o o ti 4 "YELLOW HEAT APPLIED REFLECTIVE. 35 10' I� THERMOPLASTIC Q —�7 0 ❑ O a o ❑ 1=i PAVENkENT MARKING DEMONSTRATION TYPICAL PLANS - Two -way, Four Lane Double Solid Yellow w/2 Broken White Stripes 8( 2 Shoulder Edgelines 4° WHITE HEAT APPLIED THERMOPLASTIC 4° CLEAR I/WAY REFLECTIVE MARKERS (REFLECTIVE) -I ❑ ❑ F - - p ❑ L1.1 n 4° AMBER 2/WAY REFLECTIVE MARKERS "4° YELLOW HEAT APPLIED THERMOPLASTIC (REFLECTIVE) 35, 30, , ❑ al ❑ PAVEMENT. MARKING 'DEMONSTRATION -TYPICAL PLANS- Two way, Two Lane Double Solid Yellow w/2 Shoulder Edgelines. 30, 4!'CLEAR IIWAY REFLECTIVE MARKERS 4" WHITE HEAT APPLIED REFLECTIVE THERMOPLASTIC ❑ ❑� MIN. 30, Cl 4" AMBER 2/WAY REFLECTIVE MARKERS PAVEMENT MARKING DEMONSTRATION TYPICAL PLANS- Two -way, Two Lane 'Single Dash Yellow w/2 Shoulder Edgelines D Q - 30' -� 4° CLEAR I /WAY REFLECTIVE MARKERS 35 4!' AMBER Z/WAY REFLECTIVE MARKERS 4 "YELLOW HEAT APPLIED REFLECTIVE THERMOPLASTIC r 4° WHITE HEAT APPLIED REFLECTIVE THERMOPLASTIC 4 ❑ 0 D PAVEMENT, MARKING DEMONSTRATION -TYPICAL PLANS""It Two-way, Four Lane Divided 2. Broken White w/2 Shoulder Edgelines a 2 Median Edgelines -- - ---------- 50. 0 0 30• T__ 4" WHITE HEAT APPLIED REFLECTIVE THERMOPLASTIC ta-111-MIN. ❑ ❑ ❑ MEDIAN L1 4" YELLOW HEAT APPLIED REFLECTIVE 1324" AMBER IIWAY REFLECTIVE MARKERS THERMOPLASTIC 35' ___9 10• El C4" CLEAR I/WAY REFLECTIVE MARKERS o 0 'El ci 0 0 0 _77-- PAVEMENT MARKING DEMONSTRATION ,--TYPICAL PLANS' Two-way, Five Lane Center Double Left Turn Lane w/2 - Broken White Stripes a 2 -Parking Lanes 8 10' 4 1. CLEAR VWAY REFLECTIVE MARKERS n ❑ L� 4' YELLOW HEAT APPLIED REFLECTIVE THERMOPLASTIC 35, 4" AMBER 2/WAY REFLECTIVE MARKERS 0 13 ------ 1Z 4" WHITE HEAT APPLIED REFLECTIVE THERMOPLASTIC Corpus Christi, Tex s a g day of 19 %P TO THE MEMBERS OF THE CITY COUNCIL Corpus'Christi, Texas For the reasons set forth in the emergency clause of the foregoing ordinance, a public emergency and imperative necessity exist for the suspension of the Charter rule or requirement that no ordinance or resolution shall be passed finally on the date it is introduced, and that such ordinance or resolution shall be read at three meetings of the City Council; I, therefore, request that you suspend said Charter rule or requirement and pass this ordinance finally on the date it is introduced, or at the present meeting of the City Council. Respectfully, MAYOR THE CIT4 OF RP CHRIS71, TEXAS The Charter Rule was suspended Gabe Lozano, Sr. Bob Gulley David Diaz 'Ruth Gill Joe Holt Tony Juarez, Jr. Edward L. Sample The above ordinance -was passed Gabe Lozano, Sr. Bob Gulley David Diaz Ruth Gill Joe Holt Tony Juarez, Jr. Edward L. Sample 144.10 te: :e: