Loading...
HomeMy WebLinkAbout14509 ORD - 09/20/1978jkh:9- 20 -78; 2nd AN ORDINANCE AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER NO. 2 TO THE CONTRACT WITH MAVERICK CONSTRUCTION COMPANY FOR IMPROVEMENTS TO THE HEARN ROAD DRAINAGE DITCH, A SUBSTANTIAL COPY OF WHICH IS ATTACHED HERETO AND MADE A PART HEREOF, MARKED EXHIBIT "A "; APPROPRI- ATING $4,300 OUT OF THE NO. 295 STORM SEWER BOND FUND, FOR PROJECT NO. 295- 70 -70, HEARN ROAD DITCH; AND DECLARING AN EMERGENCY. e e BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. That the City Manager be and he is hereby authorized to execute Change Order No. 2 to the contract with Maverick Construction Company for improvements to the Hearn Road Drainage Ditch, a substantial copy of which is attached hereto, marked Exhibit "A", and made a part hereof. SECTION 2. That there is hereby appropriated the sum of $4,300 out of the No. 295 Storm Sewer Bond Fund for Project No. 295- 70 -70, for improvements to the Hearn Road Drainage Ditch. SECTION 3. That the necessity to execute Change Order No. 2 to the contract with Maverick Construction Company for Hearn Road drainage ditch improvements and to appropriate the sums necessary to construct the improvements at the earliest practicable date creates a public emer- gency and an imperative public necessity requiring the suspension of the Charter rule that no ordinance or resolution shall be passed finally -on the date of its introduction but that such ordinance or resolution shall be read at three several meetings of the City Council, and the Mayor having declared such emergency and necessity to exist, and having requested the suspension of the Charter rule and that this ordinance be passed finally -on the date of its introduction and take effect and be in full force and effect from and after its passage, IT IS ACCORDINGLY SO ORDAINED, this the c20 day of September, 1978. ATTEST: "o, My Secretary MAYM APPROVED: 20 DAY OF SEPTEMBER, 1978: J. BR E AYCOCK, CITY ATTORNEY By A i tant City Attorney 14509 U CHANGE ORDER Engineering and Physical Development City of Corpus Christi, Te-•as Change Order No. 2 Project No. 295 -70 -70 Operating Department Engineering and Physical Developmeritate 8 -30 -78 Name of Project Hearn Road Ditch Drainage & Sanitary Sewer Improvements Contractor Maverick Construction Co. CHANGE ADD DEDUCT 1. Enlarge the proposed concrete retard structure that sits over the existing 48" waterline Sta. 10 +10± and add a small grate inlet to be tied to the retard structure. Also extend the re- taining wall from 1.5' to 7.51. All additional work, material 'and labor for lump sum price of $4,300.00 - see attached -sketch for further details. .$4,300.00 2. .;Delete 200 L.F. of 10" high channel wall with an 18" base and add 200 L.P. of 15" R.C.P. between the two concrete retard structures at no extra charge. Total: $4,300.00 Why was this change necessary? (If left off the plans and specifications, explain why.) The change was necessary in order to protect the existing 48" waterline which has been undermined by the continuous water flow from the C.P. & L. power plant. How can similar changes be avoided in the future? More thorough investigation during the planning and design stages. Contract Price $11,0.00 430 This Change Order, $ 4 300.00 New Contract Price $114,550.00 - Construction Engineer Funds Available CITY OF USiGHRIS I, "TEXA CONTRA OR By n BY l/O D' ec or of Engineering` P ysical Development Title City Manager City Attorney Director of Finance Rev. 3/74 ZK/,/ ,�?11 64e12 "0C :ach Way. rGrate To Be A.LW '#B7 /04 - I Or „ Approved Equ, t�-E /ev 1900 Through Retard Structure '°/ � A V V N 1y Grout Bottum OR.0 P J /n /el Toward /5 °R.0 P. - City Water Divislon To Wrap And Clean Exist, 46 Wo /er Llne NOTE: As Required And ro Remove A// Si /l, Muck, And Other Objectionable Material From Under rho Water Line. The Place l/2 °Thick- 4'Wide SlyrolaamPad Water Dtvis /on To Place And Compact Essenl /ally A// Dlrect /y 0n Extst. 48" Water L/ne Prior Fill Material Around Pipe Per Detail Above. To Pouring concrete HEARN ROAD DITCH DRAINAGE IMPROVEMENTS CHANGE ORDER No. 2 SHEET / o! 2 ' � � �•!.__ -'�:n 1 =�: Tap of Slope TV (T•S.4e 48 -W L.- 24.30) x Exist. 48" Water Line 1R.Px HEARN ROAD DITCH DRAINAGE IMPROVEMENTS CHANGE ORDER No. 2. ' SHEET Z oft E /ev 20. �if jI E /ev /7. I II SECTION A —A —60 Top of Slope E/ev. 1E 48 "iWL.= 25.20) CITY OF CORPUS CHRISTI, TEXAS CERTIFICATION OF FUNDS (City Charter Article IV Section 21) September 7, 1978 I certify to the City Council that $ 4.300 - , the amount required for the contract, agreement, obligation or expenditures contemplated in the above and foregoing ordinance is in the Treasury of the City of Corpus Christi to the credit of: Fund No. and Name 295 Storm Sewer Bond Fund Project No. 295 -70 -70 Project Name Hearn Road Ditch from which it is proposed to be drawn, and such money is not appropriated for any other purpose. FIN 2-55 �/ Revised 7/31/69 Corpus Christi, Texa 0 iay of , lg %f TO THE MEMBERS OF THE CITY COUNCIL Corpus Christi, Texas For the reasons set forth in the emergency clause of the foregoing ordinance, a public emergency and imperative necessity exist for the suspension of the Charter rule or requirement that no ordinance or resolution shall be passed finally on the date it is introduced, and that such ordinance or resolution shall be read at three meetings of the City Council; I, therefore, request that you suspend said Charter rule or requirement and pass this ordinance finally on the date it is introduced, or at the present meeting of the City Council. Respectfully, The Charter rule was suspended Gabe Lozano, Sr. Bob Gulley David Diaz Ruth Gill Joe Holt Tony Juarez, Jr. Edward L. Sample The above ordinance was passed Gabe Lozano, Sr. Bob Gulley David Diaz Ruth Gill Joe Holt Tony Juarez, Jr. Edward L. Sample 14509 THE CITY OF COPUS —.0 STI, TEXAS