HomeMy WebLinkAbout14970 ORD - 06/27/1979•ikh:6_26_79;lst
•
AN ORDINANCE
AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER
NOS. 1 AND 2 TO THE CONTRACT WITH ASPHALT PAVING &
CONSTRUCTION COMPANY FOR THE WASHINGTON-COLES AREA
STREET IMPROVEMENTS PROVIDING FOR CHANGES IN WATERLINE
FITTINGS, GATE VALVES AND ADDITIONAL HOT -MIX ASPHALT
LEVEL -UP TO SAM RANKIN STREET, ALL AS MORE FULLY SET
FORTH IN THE SAID CHANGE ORDERS, A SUBSTANTIAL COPY
OF EACH BEING ATTACHED HERETO AND MARKED EXHIBITS
"A" AND "B", AND MADE A PART HEREOF; APPROPRIATING
$8,400 OUT OF THE NO. 220 STREET BOND FUND FOR FUNDING
OF THE AFORESAID CHANGE ORDERS, APPLICABLE TO PROJECT
NO. 220-77-2.4, WASHINGTON-COLES AREA STREET IMPROVE-
MENTS; AND DECLARING AN EMERGENCY.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS:
SECTION 1. That the City Manager be and he is hereby authorized
to execute Change Order Nos. 1 and 2 to the contract with Asphalt Paving &
Construction Company for the Washington -Coles Area Street Improvements
providing for changes in waterline fittings, gate valves, and additional
hot -mix asphalt level -up to Sam Rankin Street, a substantial copy of said
Change Orders being attached hereto and made a part hereof, marked Exhibits
"A" and "B".
SECTION 2. There is hereby appropriated the sum of $8,400 out of
the No. 220 Street Bond Fund for funding of the aforesaid Change Orders,
applicable to Project No. 220-77-2.4, Washington -Coles Area Street Improve-
ments.
SECTION 3. The necessity to authorize execution of the said
Change Orders and appropriation of the sums aforesaid in order that the
Washington -Coles Area Street Improvements may continue without delay creates
a public emergency and an imperative public necessity requiring the suspen-
sion of the Charter rule that no ordinance or resolution shall be passed
finally on the date of its introduction but that such ordinance or resolution
shall be read at three several meetings of the City Council, and the Mayor
having declared such emergency and necessity to exist, having requested the
suspension of the Charter rule and that this ordinance be passed finally on
the date of its intrqduction and take effect and be in full force and effect
MICROFILMED
i497 ) 1UL 0 8198?
a •
from and after its passage, IT IS ACCORDINGLY SO ORDAINED, this the ( day
of � �4 , 1979.
ATTEST:
it 4411111(
Secretaritet�
APPROVED:
_21 7 DAY OF JUNE, 1979:
J. BRUCE AYCOCK, CITY ATTORNEY
By
stant City Attor
y
MAYO
T E CITY
F CORPUS CHRISTI, TEXAS
•
Charge Order Number
Operating Department
CHA:7G7 ORDER.
Engineering and Physical Development
City of Cornus Christi, Texas
1
Engineering and Physical Development
Project Number 162-4734-502
Date 5-29-79
Name of Project Washington -Coles Area Street Dnprovemente, Phase I
Contractor APCCO
CHANGE
ADD
DEDUCT
Add 12"x6" cast iron mechanical joint tee - 1 ea. @ $380.00/ea.
Add 8" gate valve with box - 1 ea. @ 550.00/ea.
Add 6" gate valve with box - 8 ea. @ $460.00/ea.
Add fire hydrant connection - 1 ea. @ $500.00Jea.
Add 12" service connection - 1 ea. @ S250.00 ea.
Add 1" service connection - 17 ea. @ $200.00/ea.
Add 6" cast iron mechanical joint 222 bend - 1 ea. @ $115.00
Add 12"x8" cast iron mechanical joint tee - 1 ea. @ $450.00
Add 350 L.F. of 4" perforated PITC pipe with 5/8" gravel around
pipe (for French Drain) @ $5.50/L.F.
Deduct 12" ACP, Class 150, 20 L.P. @ $17.40/L.F.
Deduct 10" ACP, Class 150, 5 L.F. @ $15.65/L.F.
Deduct 8" ACP, Class 150, 130 L.F. @ $14.10/L.F.
Deduct 6" ACP, Class 200, 114 L.F. @ 12.95/L.F.
Deduct 6" cast iron mechanical joint 90° bend - 1 ea. @ 110.00
Deduct 6" cast iron mechanical joint 45 bend - 1 ea. @ 105.00
Deduct 8" cast iron mechanical joint 22t bend - 2 ea. @ $140.00
Deduct 8" cast iron mechanical joint 11,7 bend - 1 ea. @ $135.00
Deduct 3/4" service connection - 17 ea. @ $185.00
TOTAL: $3.739.
Why was this change necessary? (If left off the plans and specifications,
380.00
550.00
3,680.00
500.00
250.00
3,400.00
115.00
450.00
$1,925.o0
348.00
78.25
1,833.00
1,476.30
110.00
105.00
280.00
135.00
$3,145.00
5
explain why.)
To cover field changes necessitated by lackof knowledge about the old water lines in the
project.
How can similar changes be avoided in the future? More research should be done prior to
construction.
tntract ?rice
7: is Charge Order
:ew Contract ?rice
lads Available
$504,235.15
$ 3739.45
$507,974.6o
Constrictin 3rgine_^
ngand Physical Development
City Attorney
Director of Finance
Kw, "A'
• CHANGE ORDER •
• Engineering and Physical Development'
City of Corpus Christi, Texas
Change Order Number 2 Project Number 162-4734-502
Operating Department Engineering and Physical Development
Date June 15, 1979
Name of Project Washington -Coles Area Street Improvements "Phase 1"
Contractor AFCCO
CHANGE ADD DEDUCT
1. Delete 5,492 S.Y. of 2" Type "D" Hot Mix @ $4.25/S.Y. $23,341.00
2. Delete 1,500 L.F. of Crack Sealing Type -I @ $1.75/L.F. $ 2,625.00
3. Delete 1,000 L.F. of Crack Sealing Type II @ $3.75/L.F. $ 3,750.00
4. Add 5,055 S.Y. of 12" Type "D" Hot Mix @ $3.20/S.Y. $16,176.00
5. Add 400 tone of Type "D" Hot Mix Level Up @ $45.50/Ton $18,200.00
TOTAL $ 4,660.00
Why was this change necessary? (If left off the plans and specifications, explain why.)
To prepare a smooth, level surface for the new protective membrane to be installed below
the type "D" overlay on Sam Rankin St.
How can similar changes be avoided in the future? Unavoidable due to the condition of
the street and attempts to utilize as much of the existing concrete street as possible.
Contract Price $507,974.60
This Change Order $ 4,660.00
New Contract Price $512,634.60
Funds Available
Construction Engineer
CON RAG�OR ,
By 6f�//�
Physical Development
Title zaa,. _
City Manager
City Attorney
Director of Finance
CITY OF CORPUS CHRISTI, TEXAS
CERTIFICATION OF FONTS
(City Charter Article 1V Section 21)
June 22, 1979
I certify to the City Council that $ 8,400 , the amount required
for the contract, agreement, obligation or expenditures contemplated in the
above and foregoing ordinance is in the Treasury of the City of Corpus Christi
to the credit of:
Fund No. and Name 220 Street Bond Fund
Project No. 220-77-2.4
Project Name
Washington -Coles Area Street Improvements
from which it is proposed to be drawn, and such money is not appropriated for
any other purpose.
/' FIN 2-55
Revised 7/31/69
Corpus Christi, Texas
day of 19-7S
TO THE MEMBERS OF THE CITY COUNCIL
Corpus Christi, Texas
For the reasons set forth in the emergency clause of the foregoing ordinance, a
public emergency and imperative necessity exist for the suspension of the Charter
rule or requirement that no ordinance or resolution shall be passed finally on
the date it is introduced, and that such ordinance or resolution shall be read
at three meetings of the City Council; I, therefore, request that you suspend
said Charter rule or requirement and pass this ordinance finally on the date it
is introduced, or at the present meeting of the City Council.
Respectfully,
G'
C
MAYO
OF CORPUS
THE CHRISTI, TEXAS
The Charter rule was suspended by the following vote:
Luther Jones ,
Edward L. Sample
Dr. Jack Best
David Diaz ae.
,
Jack K. Dumphy Ur(
Betty N. Turner
Cliff Zarsky
The above ordinance was passed by the following vote: