HomeMy WebLinkAbout15154 ORD - 10/03/1979jkh:9-28-79;1st • AN ORDINANCE AUTHORIZING THE CITY MANAGER TO EXECUTE A CHANGE ORDER TO THE CONTRACT WITH PERMIAN CONSTRUCTION COMPANY AND REPUBLIC MECHANICAL CORPORATION, A JOINT VENTURE, FOR IMPROVEMENTS TO AND EXPANSION OF THE OSO WASTEWATER TREATMENT PLANT, PROVIDING FOR A DESIGN CHANGE OF CERTAIN FOUNDATION PIERS; APPROPRIATING $13,450 FOR THE CHANGE ORDER OUT OF THE N0. 250 SANITARY SEWER BOND FUND APPLICABLE TO PROJECT N0. 250-77-4, OSO PLANT IMPROVEMENTS, BOTH THE APPROVAL OF THE CHANGE ORDER AND THE APPROPRIATION OF FUNDS BEING SUBJECT TO THE CONCURRENCE IN AND APPROVAL OF THE ENVIRON- MENTAL PROTECTION AGENCY (C-48-1214-03); AND DECLARING AN EMERGENCY. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. That the City Manager be authorized to execute a Change Order to the contract with Permian Construction Company and Republic Mechanical Corporation, a joint venture, for improvements to and expansion of the Oso Wastewater Treatment Plant, providing for a design change of certain foundation piers, as more particularly described in the Change Order, a substantial copy of which is attached hereto and made a part hereof, marked Exhibit "A". SECTION 2. That there is hereby appropriated the sum of $13,450 out of the No. 250 Sanitary Sewer Bond Fund for the aforesaid Change Order applicable to Project No. 250-77-4, Oso Plant Improvements. Both the approval of the aforesaid Change Order and the appropriation herein and hereby provided are subject to the concurrence in and approval of the Environmental Protection Agency (C-48-1214-03). SECTION 3. The necessity to authorize execution of the said Change Order and appropriation of the sums described, subject to approval of and concurrence by the Environmental Protection Agency, creates a public emergency and an imperative public necessity requiring the suspen- sion of the Charter rule that no ordinance or resolution shall be passed finally on the date of its introduction but that such ordinance or resolu- tion shall be read at three several meetings of the City Council, and the Mayor having declared that such emergency and necessity exist, and having requested the suspension of the Charter rule and that this ordinance be 15154 MICRuilL1V1to AUG 281980 passed finally on the date of its introduction and take effect and be in full force and effect from and after its passage, IT IS ACCORDINGLY SO ORDAINED, this the day of October, 1979. ATTEST: �i 471 Ci y Secretary APPRQVED: DAY OF OCTOBER, 1979: J. BRUCE AYCOCK, CITY ATTORNEY MAY HE CI OF CORPUS CHRISTI, TEXAS Po, �uti on dr,_ Control Project No.-W.P.C.-TEX-I214 E.P.A. Step 2 Grant No, C -4g`1214 Improvements to t Corpus Christi the Oso Wastewater Treatment p Contract No. Texas lent 4 Treatment Plant Ex ansion First Phase of Plant Construction Job No. 9254.30 CHANGE ORDER NO. 2 Part A. Necessity of Change Order: The soil conditions encountered while attempting of the drilled shafts for the plant office and were 9 construction unacceptable because groundwater enteringcontrol building low casing caused caving in excess of antic from from soil borin what was r m be- ef the g. This caving would threaten the tintegrit underreamed pier, thus jeopardizing the of shaft. Therefore gri ty of tate , a change in design correctness construction and to is required of the shafts are maintained. insure that the integrity of the Part B. Description of Work: Item 1. plant Office and Control Buildin : a. Change 16 inch diameter shafts with 48 inch dia- meter underreamed piers et a bottom elevation of -2.1 feet to 30 inch diameter straight shafts (no underreamed piers) with a bottom elevation of -6.0 feet. b. Change 20 inch diameter shafts with 60 inch dia- meter underreamed piers at a bottom elevation of -2.1 feet to 30 inch diameter straight shafts (no underreamed piers) with a bottom elevation of -11.0 feet. c. The reinforcing steel for the drilled shafts are to remain, as shown on contract drawings. Item 2. Blower Houses No. 2 and 4: a. If necessary, change 14 inch diameter shafts with 42 inch diameter underreamed piers at a bottom elevation of -2.1 feet to 18 inch diameter straight shafts (no underreamed piers) with a bottom ele- vation of -11.0 feet. b. The reinforcing steel for the drilled shafts are to remain as shown on contract drawings. Part C. Construction Method: Item 1. Plant Office and Control Buildin : The shafts are to be drilled and then inspected by engineer. If the soil conditions encountered threaten integrity of shaft, casing shall be required. Item 2. Blower,Rous s No, 2 and 4; The contractor shall attempt to drill the shafts as shown in the contract drawings. If shafts acceptable, the contractor shall ori- ginallyare specified. If shafts proceed taso the contractor shall re rYunacceptable, from engineer Croce written ngwh design out in this ch an 2e to proceeding with desi this g order. The shafts out change order, are to be ' as set out inspected by engineer. drilled and then en- countered threaten If the soil conditionsal be required, integrity of shaft, casing shall Each blower house shall be considered separately, and if possible, all drilled shafts der a blower house shall be of the same un- IPo tem 3 +ne design, urin of Concrete; When encpouri cgeconcrete, a hopper shall be used to downward. wnward. The concrete shall fall y, unobstructed.. Part D. Cost Breakdown; Item Description hb. Quantity Unit of Unit Total Cost 1. Change in drilled shafts for plant office & con- trol building. (Deduct $25.00 per shaft (36 shafts total) if cas- ing is not required. Maxi- mum possible deduction is $900.00.) 1 LS $9,122.00 2. Change in drilled shafts $ 9,112.00 for Blower House No. 2* (Deduct $25.00 per shaft (22 shafts total) if cas- ing is not required. Maxi- mum possible deduction is $300.00.) 1 LS $2,169.00 3. Change in drilled shafts $ 2,269.00 for Blower House No.4* (Deduct $25.00 per shaft (12 shafts total) if cas- ing is not required. Maxi- mum possible deduction is $300.00) Measure Price Tn Place Maximum Allowable Cost for Change Order No. 2.** 1 LS $2,169.00 $ 2,169.00 $13,450.00 *The change in drilled shafts for blower houses No. 2 and 4 may not bo required (see Item 2 of Part C'"Construction Method"). **The contractor shall only .be reimbursed for extra work done. The original contract sum was The net change by previous change orders The contract sum prior to this change order The contract sum will be increased by this change order a maximum of The new contract sum including this change order will be a maximum of The original completion time was The completion time will be increased by The completion time will be En Urb By: r J. Partner Date: , P.E. 79 Contractor: Permian/Republic A Joint Ventur By: Ma Vi was A. Lammon -President Date: $7,411,000.00 -0- $7.411,000.00 $ 13,450.00 $7,424,450.00 500 working days -0- S00 working days Owner: City of Corpus Christi By: James K. Lon to ,P .E „ Director of En gr. & Physical Dev. Date: CITY OF CORPUS CHRISTI, TEXAS CERTIFICATION OF FUNS (City Charter Article IV Section 21) September 26, 1979 I certify to the City Council that $ 13,450 , the amount required for the contract, agreement, obligation or expenditures contemplated in the above and foregoing ordinance is in the Treasury of the City of Corpus Christi to the credit of: Fund No, and game 250 Sanitary Sewer Bond Fund Project No. 250-77-4 Project Name Oso Plant Improvements from which it is proposed to be drawn, and such money is not appropriated for any other purpose. • iYe o1. lg-rte Director of Finance ry � ,C/ tl/4 FIN 2-55 V Revised 7/31/69 - • FtNANCE SEP 0 I 57 PM '19 ) Corpus Christi, exas .3 day of �, 19 IP TO THE MEMBERS OF THE CITY COUNCIL Corpus Christi, Texas For the reasons set forth in the emergency clause of the foregoing ordinance, a public emergency and imperative necessity exist for the suspension of the Charter rule or requirement that no ordinance or resolution shall be passed finally on the date it is introduced, and that such ordinance or resolution shall be read at three meetings of the City Council; I, therefore, request that you suspend said Charter rule or requirement and pass this ordinance finally on the date it is introduced, or at the present meeting of the City Council. Respectfully, MAYOR, 'THE FY OF CORPUS CHRISTI, TEXAS The Charter rule was suspended Luther Jones Edward L. Sample Dr. Jack Best David Diaz Jack K. Dumphy Betty N. Turner Cliff Zarsky by the following The above ordinance was passed Luther Jones Edward L. Sample Dr. Jack Best David Diaz Jack K. Dumphy Betty N. Turner Cliff Zarsky by the vote: following vote: 15151