AN ORDINANCE
AUTHORIZING THE CITY MANAGER TO EXECUTE CHANGE ORDER
NOS. 1 AND 2 TO THE CONTRACT WITH APCCO FOR THE RE-
ALIGNMENT OF SHELY STREET (BEING DONE IN CONJUNCTION
WITH THE N.E.B. TENNIS COURT IMPROVEMENTS' PROJECT),
TO PROVIDE FOR THE REHABILITATION OF FIG STREET FROM
TARLTON STREET TO SHELY STREET AND THE COSTS INCURRED
IN THE REDESIGN OF THE LARGE PARKING LOT; APPROPRIAT-
ING $30,093.66 OUT OF THE NO. 220 STREET BOND FUND
($25,995.30 FOR CHANGE ORDER NO. 1 FOR FIG STREET AND
$4,098.36 FOR CHANGE ORDER NO. 2 FOR THE PARKING LOT)
APPLICABLE TO PROJECT NO. 220-77-23, SHELY STREET
REALIGNMENT; AND DECLARING AN EMERGENCY.
BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, •
TEXAS:
SECTION 1. That the City Manager be authorized to execute Change
Order Nos. 1 and 2 to the contract with APCCO for the realignment of Shely
Street (being done in conjunction with the H.E.B. Tennis Court Improvements
Project), to provide for the rehabilitation of Fig Street from Tarlton Street
to Shely Street and the costs incurred in the redesign of the large parking
lot, all as more fully set forth in the Change Order Nos. 1 and 2, a sub-
stantial copy of each being attached hereto as Exhibits "A" and "B".
SECTION 2. That there is hereby appropriated out of the No. 220
Street Bond Fund the sum of $30,093.66, $25,995.30 being for Change Order
No. 1 for Fig Street and $4,098.36 for Change Order No. 2 for the parking
lot, applicable to Project No. 220-77-23, Shely Street Realignment.
SECTION 3. The necessity to authorize execution of the aforesaid
change orders at the earliest practicable date and to appropriate the sums
necessary to accomplish the work proposed by the said change orders creates
a public emergency and an imperative public necessity requiring the suspension
of the Charter rule that no ordinance or resolution shall be passed finally
on the date of its introduction but that such ordinance or resolution shall
he read at three several meetings of the City Council, and the Mayor having
declared that such emergency and necessity exist, having requested the sus-
pension of the Charter rule and that this ordinance be passed finally on the
date of its introduction and take effect and be in full force and effect from
15252
and after its passage, IT IS ACCORDINGLY SO ORDAINED, this the 5 day
of December, 1979.
ATTEST:
APPROVED:
DAY OF DECEMBER, 1979:
J. BRUCE AYCOCK, CITY ATTORNEY
MAYOR
THE CIT 1F CORPUS CHRISTI, TEXAS
CHANCE ORDER
_Engineering and Physical Development
City of Corpus Christi, '.!7e: -as
Change Order No. 1 Project No. 220-77-23
Dperating Department Community Enrichment Date November 21, 1979
Name of Project HEB Tennis Center Expansion
Contractor APCCO
CHANGE
ADD DEDUCT
Add rehabilation of Fig Street from Shely Street to Tarleton Street to
contract per the following quantities at established contract unit prices.
1. Excavation 784 SY @ 4.25 = $ 3,332.00
2.' Caliche 784 SY @ 5.30 = 4,155.20
3. 11" Type "D" Hot -Mix 576 SY @ 3.65 = 2,102.40
4. Prime Coat - 87 Gal @ 1.50 130.50
5. Pavement Repair 15 SY @ 10.00 = 150.00
6. 6" Curb & Gutter 1005 LF @ 5.20 = 5,226.00
7. 4' Concrete Sidewalk 5008 SF @ 1.65 = 8,263.20
8. Concrete Driveway - 460 SF @ 3.65 = 1,679.00
9. Standard 5' Inlet 1 EA @ 725.00 = 725.00
0. 15" R.C.P. 16 LF @ 14.50 = 232.00
TOTAL $25,995.30
Remove existing head -in parking area @ Sta. 2+00 Lt. to Sta. 4+00 Lt. and backfill
and grade area as subsidiary to this change order. Add 12 working d,ys.
Why was this change necessary? (If left off the plans and specifications, explain why_)
Beyond scope of original project.
How can similar changes be avoided in the future? N/A
Contract Price
$428,200.20
This Change Order: $ 25,995.30
New Contract Price $454,195.50
Funds Available
CITY OF CORPUS CHRISTI, TEXAS
By
Director of Engineering & Physical Development
aPPROVEr
City Manager
City Attorney
Construction Engineer
CONTRACTOR
City of C rpus
Chi= _ Order iu.:,ber 2 Project !lumber 22G-77-23
Operat:.ng Dea_tment En,ineerins and TY!vsical n>vA1oT"rt
Name o: Project H.E.E. Park and Tennis Center Expansion
Contractor APCCO
Date 11-21-79
CHANGE
1. Add payment for backfill of previous excavation
at $2.12 per S.Y. 1,200 S.Y.
2. Add payment for 131 L.F. of curb and gutter removal @ $2.60
per L.F.
3. Add payment for removing 550 S.F. of existing 10' concrete
sidewalk @ $o.82 per S.F.
4. Add payment for removing 168 S.F. of existing 4' concrete
sidewalk @ $0.82 per S.F. -
5. Add 75 L.F. of gravity curb around existing trees @ $4.00/L.F.
6. Add $125.00 for the modification of an existing inlet at the
west end of proposed parking lot.
7. Adjust east fence of 5 court battery and west fence of 3 court
battery as per the attached sketches for luno sum price of
$200.00. The adjustment would be deleting 145 L.F. of a 10'.
"_,T. high windscreen fence and adding 145 L.F. of 5' tennis mesh
fabric fence.
---Continued Page 2 ---
ADD
$ 2,544.00
$ 340.60
$ 451.00
$ 137.76
$ 300.00
$ 125.00
$ 200.00
DEDUCT
Why vas this change necessary? (If left off the plans and specifications,
Because the neighborhood around the tennis courts objected to the proposed
locations after construction had started. Item #7 is a reouest of park and
explain why.)
parkin¢ lot
recreation.
How can similar changes be avoided in the future?
Contract Price $454,195.50
This Change Order $ 1+,098.36
New Contract Price
Funds Available
$458,293.86
CITY OF CORPUS CHRISTI, TEXAS
By
Unavoidable
Construction Engineer
CONTRACTOR
By
Director of Engineering and Physical Development
City Manager
City Attorney
6PFDVED
Director of Finance
Title
x/ .4i,
va _ 2 .,r 3
CHANGE ORDER
(continued)
CHANGE
8. Five (5) day time extension authorized for this work.
9. Contractor agrees that this change order will satisfy existing
claims made as a result of possible parking lot delays and no
further claims as a result of perking lot delays wi]1 be made.
11-21-79
ADD DEDUCT
Total $ 4,098.30
Page 3 of 3
L •
/0'
•
Z
•
e E
'
L
Aave
r • r",
1
10
Go
74,5 61-C2 /-274ve
<>.
6c '
Zc
CITY OF CORPUS CHRISTI, TEXAS
CERTIFICATION OF FUNDS
(City Charter Article IV Section 21)
November 29, 1979
I certify to the City Council that $ 30,093.66 , the amount required
for the contract, agreement, obligation or expenditures contemplated in the
above and foregoing ordinance is in the Treasury of the City of Corpus Christi
to the credit of:
Fund No. and Name
Project No,
Project Name
220 Street Bond Fund
S20 -x£--59 v Vo _ 71- L3
Shely Street Realignment
from which it is proposed to be drawn, and such money is not appropriated for
any other purpose. •
FIN 2-55
Revised 7/31/69
f
�_.
FIIIAN^r 11-
hi/ �3g PpHr,
I9
Corpus Christi, Te.x
day of
TO THE MEMBERS OF THE CITY COUNCIL
Corpus Christi, Texas
19
For the reasons set forth in the emergency clause of the foregoing ordinance, a
public emergency and imperative necessity exist for the suspension of the Charter
rule or requirement that no ordinance or resolution shall be passed finally on
the date it is introduced, and that such ordinance or resolution shall be read
at three meetings of the City Council; I, therefore, request that you suspend
said Charter rule or requirement and pass this ordinance finally on the date it
is introduced, or at the present meeting of the City Council.
Respectfully,
MAYOR" /
E CITY QF CORPUS CHRISTI, TEXAS
The Charter rule was suspended by the following vote:
Luther Jones
Edward L. Sample
Dr. Jack Best
David Diaz
Jack K. Dumphy
Betty N. Turner
Cliff Zarsky
The above ordinance was passed
Luther Jones
Edward L. Sample
Dr. Jack Best
David Diaz
Jack K. Dumphy
Betty N. Turner
Cliff Zarsky
by the
following vote:
1522