Loading...
HomeMy WebLinkAbout028756 ORD - 08/31/20101 ORDINANCE AMENDING CHAPTER 14 "DEVELOPMENT SERVICES," ARTICLE XIII, "DEVELOPMENT SERVICES FEES", DIVISION 1, "TECHNICAL CONSTRUCTION CODE FEES", SECTION 14-1302, "STANDARDIZED BUILDING VALUATION"; SECTION 14-1304, "PROCESSING AND PLAN REVIEW FEE"; SECTION 14-1306, "SPECIAL FEES"; SECTION 14-1307, "REDUCED FEES"; SECTION 14-1312, "ACCOUNTING"; AND SECTION 14-1313, "TECHNICAL CONSTRUCTION CODE FEE SCHEDULES", OF THE CODE OF ORDINANCES, CITY OF CORPUS CHRISTI, TO PROVIDE FOR MINIMUM PERMIT FEES, SIMPLIFIED METHODS TO CALCULATE BUILDING PERMIT FEES AND PLAN REVIEW FEES; TO PROVIDE FOR EXPEDITED PLAN REVIEW BY INTERNAL STAFF; TO PROVIDE FOR CUSTOMIZED PLAN REVIEW; TO PROVIDE DISCOUNTS OF FEES TO PERMIT HOLDERS MEETING CERTAIN REQUIREMENTS; TO PROVIDE FOR SPECIAL INSPECTIONS ON NON-STANDARD DAYS AND HOURS; TO PROVIDE FOR CERTIFICATES OF COMPLETION TO SHELL BUILDINGS; TO PROVIDE FOR FEES FOR CONSTRUCTION SITE OFFICES, FEES FOR BOTH STANDARD AND DUPLICATE CERTIFICATES OF OCCUPANCY, FEES FOR TEMPORARY EVENTS, PENALTY FEES, INSPECTIONS OUTSIDE OF THE CITY LIMITS, ELECTRICAL PERMIT FEES, PLUMBING PERMIT FEES, MECHANICAL PERMIT FEES, FUEL GAS PERMIT FEES, SWIMMING POOL FEES; AND PROVIDING FOR FEES FOR EXISTING APPLICATIONS MADE PRIOR TO THE EFFECTIVE DATE; PROVIDING FOR SEVERANCE; PROVIDING A REPEALER CLAUSE; AND PROVIDING AN EFFECTIVE DATE OF OCTOBER 1, 2010. SECTION 1. Code of Ordinances, Chapter 14, Development Services, Article XIII, Development Services Fees, is amended by revising the Article to read as follows: "Division 1. Technical Construction Code Fees. Sec. 14-1301. General requirements. (a) Fees required. A fee must be paid for any installation, alteration, addition, change, or repair that requires a permit under the technical construction codes. (1) A permit may not be issued until the prescribed fees have been paid. (2) An amendment to a permit may not be released until any additional fees, due to an increase in the estimated cost of the building, structure, electrical, plumbing, mechanical, gas, or energy conservation systems, have been paid. (Ord. No. 25467, § 1, 9-9-2003) Sec. 14-1302. Standardized building valuation. (a) The standardized building valuation system to be used to compute construction permit fees will consider the total value of all construction work, including plumbing, electrical, paving, parking, driveway approach, energy conservation, fuel gas, mechanical equipment, and other systems, including appurtenances and site improvements, materials, labor, contractor's profit and overhead. (1) The valuation of building, alteration, or structure used in computing building permit fees will be based on, and at least equivalent to, the latest standardized building valuation data as published by the H:\LEG-DIR\Lisa12010 OrdinanceWFee Table -legislative version8.16.2010.doc 028756 INDEXED 2 International Code Council Building Safety Journal, as adjusted by the latest regional construction cost adjustment factors published annually by Engineering News Record. The building official may alternatively accept a comparable valuation submitted by the applicant. The applicant's valuation shall be verified against the Elimination of Architectural Barriers Report, if one is required, and the higher of the two (2) valuations shall be used. In the event the Elimination of Architectural Barriers Report valuation is not available prior to issuance of the permit, the Elimination of Architectural Barriers Report valuation shall be confirmed prior to conducting the final inspection. If additional permit fees are required, the final inspection shall not be passed until all fees are paid. If no Elimination of Architectural Barriers Report is available, the building official may refer to the latest standardized building valuation data as published by the International Code Council Building Safety Journal, as adjusted by the latest regional construction cost adjustment factors published annually by Engineering News Record. (2) The applicant for a construction permit may appeal any determination of the Building Official to the building code board of appeals. (3) Standardized building valuations required pursuant to paragraph (1) will be used as the basis for pai permitting of a project, such as for the foundation, shell, and interior finish phases. (4) Standardized building valuations required pursuant to paragraph (1) for pre-engineered metal building warehouses must be values derived pursuant to paragraph (1). (5) Standardized building valuations required pursuant to paragraph (1) will be derived from the latest data published by International Code Council Building Safety Journal and Engineering News Record and adjusted based on the regional multiplier published by the International Code Council. (6) The standardized building valuations referred to in paragraph (1) are adopted by reference and declared to be a part of this section. (7) If, in the opinion of the Building Official, or the Building Official's authorized representative, the valuation of a commercial building, alteration, structure, electrical, energy conservation, fuel gas, mechanical, or plumbing systems appears to be underestimated on the application, the permit may be denied, unless the applicant can show detailed estimates or appraisals that meet the approval of the Building Official. Alternatively, the Building Official may set the permit valuation pursuant to the standardized building valuation data adopted in paragraph (1), and issue the permit with a fee based on that valuation. Permit valuations must be based upon total construction cost, such as electrical, energy conservation, fuel gas, mechanical, plumbing equipment and other systems, including materials and labor, site improvements, contractor's profit and overhead. (b) When determining the value that is applied to the fee schedule, values are rounded up to the next higher one thousand dollar -valuation category. Sec. 14-1303. Calculation of building area for residential construction. (a) Except as provided in subsection (b) of this section, building area includes all rooms and spaces within the main structure, except for attached (1) covered patios open to the environment and (2) front and rear porches open to the environment. (b) The building area for residential roofing/re-roofing includes attached garages, covered patios open to the environment, and front porches and rear open to the environment. (c) Accessory residential construction includes room additions, storage rooms, utility rooms, garages, carports, patio covers, raised decks, skate board ramps, greenhouses, portable buildings, gazebos, and other similar uses. Sec. 14-1304. Processing and plan review fee. (a) A processing and plan review fee must be paid in addition to the regular permit fee as in the fee schedule published in Table 13-1. H:1LEG-DIR\Lisa12010 OrdinancelFee Table -legislative version8.16.2010.doc 3 (b) The plan review fees must be paid at the time application is filed for each application processed and reviewed for the purposes of obtaining a permit as required by the technical construction codes, including except: (1) New construction (both commercial and residential). (23 Additions. (3) New interior commercial tenant spaces. (5) Detached accessory buildings greater than or equal to four hundred (100) square feet in area. (7) Rehabilitation of moved wings -(genera repairs). The fcc for the rehabilitation of moved buildings 1. Permits categorized over the counter as deemed by the Building Official. An official list will be published each calendar year. (d) (c) Plan review fee is non-refundable. (e) � A third party plan review or inspection may be requested by the applicant at the time the application is filed. The fee for a third party plan review or inspection requested by the applicant pays the costs of services of an approved third party consultant and the applicable overhead rate. The fee for a third party plan review requested by the applicant must be paid at the time the application is filed. The fee for a third party inspection requested by the applicant must be paid prior to the inspection. The fees for third party plan review and inspection requested by the applicant are listed in the fee schedule in section 14-1313. Third party consultant contracts are available through the development services department. (e) Expedited plan review by internal staff may be requested by the applicant at the time the application is filed. The expedited fee is payable at the time of application submittal according to the fee schedule published in Section 14-1313. Expedited Plan Review does not constitute an approval of submitted plans. (f) Customized Plan Review. 1. Customers who desire expedited approval may schedule a meeting with the Plan Review Coordinator and staff in order to obtain the necessary permits for the submitted project. Customers must be accompanied by their design professional(s), (engineers, contractors, owners, or any else) who may make on the spot corrections, changes or decisions necessary to address all of the deficiencies on the plans. 2. Submitted plans must be ready for permit issuance. 3. If all plan deficiencies can be addressed, a site/foundation permit has or can be issued, a Contractor has been hired and is present, and all fees paid, then a Building Permit will be issued at the end of the customized plan review meeting. 4. If some issues cannot be resolved at the Customized Plan Review meeting, but can be addressed at a later date, another Customized Plan Review meeting will not be required. Once the issues addressed, a Building Permit will be issued to the contractor. Sec. 14-1305. Minimum fee. In the event the total fees, under the applicable fee are less than designated minimum fee, the minimum permit fee applies. Sec. 14-1306. Special fees. (a) Re -out inspection. A re -out inspection fee is required for the purposes of obtaining a temporary and/or permanent electrical release. H:1LHG-DIRILisa12010 Ordinance\Fee Table -legislative version8.16.2010.doc 4 (1) A separate re -out inspection fee will not be charged when a certificate of occupancy fee has been paid. (2) If the re -out inspection is performed concurrently with the electrical permit inspection, and the electrical permit fee has been paid, a separate re -out inspection fee will not be charged. (b) Failure to obtain permit. (1) The applicable surcharge and investigation fee must be paid to help defray the additional cost of inspection for work that has already been done, before the required permit is issued. (2) The surcharge is not a penalty, and does not precludes any other remedies available to the city to enforce the technical construction codes. The collection of the surcharge and investigation fee made is to help defray the cost of additional inspections and administrative time to research and issue the required permits. (3) The surcharge and investigation fee is not required for emergency work commenced under section 14-215(f). However, if the required permit is not obtained within twenty-four (24) hours, excepting weekends and holidays, the permit fee must be doubled or the surcharge paid, whichever is greater. (c) Re -inspection fee . When a re -inspection fee has been assessed under section 14-222(g)(1), re- inspection fee must be paid. (d) Survey fee . A survey fee will be collected for fire surveys, code compliance surveys, construction status surveys, building evaluations, repossession surveys, etc. (e) Relocation surveys . A relocation survey fee will be collected for performing relocation surveys to determine the minimum code compliance requirements for structures proposed to be relocated (moved) and placed back in operation. (f) Permit research . A permit research fee will be collected for research to provide verification of legal descriptions, property dimensions, ownerships and/or other construction related data from permit files, etc. The cost of duplication of documents will be charged as allowed under the Texas Public Information Act. (g) Inspections outside the city . Additional fees will be charged for inspections made outside the city limits. (h) Administrative fee for permit extension . When an extension of a permit is required, an administrative fee must be paid before the extension is granted. (i) Renewal of expired permit . The holder of an expired permit, who desires to reactivate the permit and has performed work under the permit, must pay the administrative fee for a permit extension and an the minimum re inspection fee in accordance with the permit fee schedule. (j) Re -inspections . The permit holder or his agent must pay a re -inspection fee in accordance with the permit fee schedule, prior to a re -inspection. A re -inspection is required when: (1) It has been found that the portion of the construction for which an inspection was requested is not ready for the inspection. (2) Corrections that were called for have not been made. (3) The premises are not made readily available for inspection. (4) The work, construction, installation of wiring, piping, or other equipment or systems is found to be faulty or incorrectly or defectively installed. (k) Certificate of occupancy for existing buildings. When an application for a new certificate of occupancy for an existing building or space is made, a processing and compliance investigation fee must paid at the time of application. (1) Duplicate certificate of occupancy . In the event that a certificate of occupancy is lost or destroyed, a duplicate certificate of occupancy may be issued provided that a fee is paid in accordance with the permit fee schedule. (m) Technology fee. The technology fee- is used to fund computer equipment and other technologies for inspectors. H;1LEG-DIR\Lisa12010 OrdinancelFee Table -legislative version8.16.2010.doc 5 En (m) Multiple plan review fee. After the second plan review of corrections submitted in response to plan review comments, an escalating fee will be assessed for each subsequent submission up to the total amount of the plan review fee. Partial responses shall be treated as additional responses following the first partial response in resubmission. Applicant may appeal the fee to the building official or assistant city manager for development services to review and determine if comments to applicant were legible, accurate, and reasonably understandable. If the building official or assistant city manager for development services determines the comments to be faulty no fee will be assessed. Sec. 14-1307. Reduced fees. (a) Permit and survey fees for public schools, federal state, county and municipal government and other political subdivisions having ad valorem tax exempt status, and for churches and all other state constitutionally exempted ad valorem tax entities is fifty (50) per cent of the regular permit fee; if the building and land on which the building is situated is owned and used by the tax exempt entity. However, a reduced permit fee may not be less than the minimum fee regularly charged. A reduced fee may not be paid when work has been commenced without proper permits. (b) Permit and sum+ fees for buildings within renewal community aro fifty (50) per cent of the regular permit fee. However, a reduced permit fee may not be less than the minimum fee regularly charged. (b) Discounts of stated fees of 2% will be made for both residential and commercial permits for the following: 1. Adherence to all permit holder responsibilities as listed in Chapter 14. 2. Electronic submittals of plans and related documents. 3. Submittal of master plans. Sec. 14-1308. Refunds. (a) Canceled permit. A permit may be canceled upon written application by the applicant at any time within two (2) months of the date of the issuance of a building permit or within two (2) months of the date of issuance of any electrical, mechanical, or plumbing permit. If no work has been done under such permit, the permit fee may be refunded when formally requested in writing by the applicant, provided that the city must retain a cancellation fee to cover the cost of auditing the fee and preparing the request for refund. In all other instances regarding any fees for which a refund is requested due to contract default, lease cancellation, or other similar circumstances, the city must retain the minimum permit fee to cover the cost of auditing the fees and preparing the request for refund. Plan review fees are non-refundable. (b) Multiple plan review fee appeal. A refund may be requested upon written application by the applicant after an appeal has been made to the building official or assistant city manager for development services and approved by either one. (Ord. No. 25467, § 1, 9-9-2003; Ord. No. 027645, § 4, 4-8-2008) Sec. 14-1309. Reserved. Editor's note: Ord. Ne. 027 45, § 8, adopted Apr. -8, 200 , repealed § 14 1309, which pertained to fees rounded off and derived from Ord. No. 25467, § 1, adopted Sept. 9, 2003. payment is made. Sec. 14-1310. Fees for examinations and licenses. H:ILFG-DIRILisa12010 OrdinancelFee Table -legislative version8.16.2010.doc 6 (a) The required examination fee for a license to qualify electricians of all classes must accompany the application for a license. (b) Any required license fee must be paid before the issuance of a license. (c) The license fee must be paid annually. Licenses are valid for only in the calendar year in which the fee is paid. A license is not valid unless and until the license fee has been paid for the calendar year. (d) Duplicate licenses may be issued to replace a lost or destroyed license, if the license holder presents provided satisfactory evidence that the license was loss or destroyed, and the licensee pays the fee for the duplicate license. Sec. 14-1311. Contractor registration fees. An electrical, mechanical, plumbing contractor and a lawn irrigator or backflow prevention assembly tester must pay an annual registration fee to maintain a current status as a registered contractor. Individual who holds multiple registrations must pay separate fee for each registration. Sec. 14-1312. Accounting. (a) The building official must keep a permanent accounting of all permit fees and other monies collected, the names of all persons upon whose account the fees were paid, along with the date paid and amount of the fees. (b) A periodic financial audit of fee revenues and expenditures shall be conducted. The audit shall occur not less than once every three (3) years, but annually in the 2008 2009 and 2009 2010 Fiscal Years. The audit shall include a report of fees that are authorized to be collected, the amount of each authorized fee that was actually collected, and the amount of fees that should have been collected. The audit shall also provide a detailed accounting of the uses of the fees. The audit shall make any recommendations for improvements or corrections. The audit shall include a report on the amount of fees that need to be collected in order to make the development services special fund independent of subsidies from the general revenue fund. Sec. 14-1313. Technical construction codes fee schedules. The following fee schedules apply to activities under article II of this chapter: TABLE INSET: PLAN REVIEW FEES AMOUNT OF FEE R sidtnt al -I; la} i.i4:e tei,4 {.` $19.25pr 24S0.021 ;1313}} of 1r` l- l }] G'reate:f -a :. .'' of building pei- .e Y.' ' :',' building fee Si t�� review ef perrnit .tb nex.0 ol} . e .. .i! pe - i -t -fee -for at:y \'aluauicm - ;OO M4(4) Plan Review Fees (leased as a percentage of the Building. P'rnzrt Fee) RESIDENTIAL 25% of the Building Permit Fee H:ILEG-DIRILisa12010 Ordinance\Fee Table -legislative version8.16.2010.doc 7 COMMERCIAL 40% of the Building Permit Fee RESIDENTIAL 0.52% of Multiple plan review fee 15% of original plan review fee for third review submittal; 30% of original plan review fee for fourth review submittal; 45% of original plan review fee for fifth review submittal; 60% of original plan review fee for sixth review submittal; 75% of original plan review fee for seventh review submittal; 90% of original plan review fee for eighth review submittal; 100% of original plan review fee for ninth and above review submittals Third party plan review when requested by applicant Contract rate + 32% overhead rate .Expedited Plan 150% of the Hal Review Rate .Review (Internal Staff) Customized. Plan 150% of the Flaw. Review Rate . lits $1.50.110 er hour with a two-hour Review ew m.iu i IT1t:i1Ti. TABLE INSET: BUILDING PERMIT FEES - S80,00 Min., Permit..,;ee AMOUNT OF FEE RESIDENTIAL 0.52% of Valuation COMMERCIAL 4_ om ertia l-batil in4,..,. itl.ta#-1....-:.-.:.. .-. 8-_00G---- $75,00— 7:5 -.00........$:7 Commercial building >-$7k000 . s $2%1,000--- -'- S-3-7,80+ -l4) $6,07 -5 -pct° $6, $1: {) valwition valuation evef $2,00() ='.-. ., . ; .. :.,.-.. ,.: 34) ti -;1 10,004 $4.474-5 .7'1,45 --per $1-,11(141 valuation ation 11:ILEG-DIR\Lisa12010 OrdinancelFee Table -legislative version8.16.2010.doc 8 HALEG-DIR\Lisal2010 OrdinancelFee Table-legislativc version8.16.2010.doc $20.5000--- Commereial-building-valuati-on-->=4-1-4-4;000-- $.-5-034 $2,025 -per ' Con f,t.i-t evef $110,-000 SO to $5 Million 70% of Valuation $5.001 to $10 Mil.lion Vaittati On S 1 0.00 1 to $2() Million 60% of 'Valuatio .1 $20.001 to $50 Million .58% pf Valuation Construction site offices $45.90 -$80.00 L 4! S Sign $108.00 HIM -deal Permit for Signs, per transformer $6.75 Min Fee S8().00 Residential construction building permits New one- and two-family dwellings, apartments, Accessory buildings. Remodel, and :Repail townhouses, condominiums, stieare-feet (yir 14,144 -Pit 0.52% of Valuation for (- ential construction Accessory-N.sidtntial-eon&truetion-for-structures>,=-104-square--Poct- ..... . per cy-Kteval--residelitial-ealIS.tftletif311--afid-re,pairs--- HALEG-DIR\Lisal2010 OrdinancelFee Table-legislativc version8.16.2010.doc 9 Residential — Other House moving permit $467.00 Swinrrniug Pool '0 { 5 Relocation survey Roofing. and SidingS.0 S,044--s-q7-ft Sc_lt.z.., rivewav. disci.pli:c $80.00 Re -out inspection to establishelectric rrl_service in lit home wherc_nc service hers. c tr'5t€din thy'previous 90 days ;P -y.:- 4._..- $80.00 .. .. - r75.00 jj E )y^( } S�3.-Y�+)�4l.'..1...5{13e{'.�.�(� TABLE INSET: Fees for Moving structures — Both Residential and Commercial House moving permit $467.00 Traffic engineering moving route sheet $61.00 Relocation survey $110.25 Survey fee (14-306(d)) $0.10 per disci.pli:c o -x1.40.00 Mobile home/HUD-code manufactured housing installation permit $106.50 TABLE INSET: MISCELLANEOUS CONSTRUCTION FEES Certificate 2 . a c i Qcc Certificate of occupancy for change of use of existing building or structure X21. 00 Duplicate certificate of occupancy/Certificate of Completion $0.10 per page 125,00 H:1LEG-DIRILisa12010 Ordinance\Fee Table -legislative version8.16.2010,doc 10 Temporary events Temporary event permit w/o food service $64.80 -$89310 Temporary event permit w/ food service $199.80 Miscellaneous Fees -AMOUNT-OF-FEE-..-...- MQ1-JNT--OF-..,T..E-.-..Greater Permit extension Greaterof: $80.00 or 33.75% of permit fee Renewal of expired permit Greater of $7-54)0 • $80.00 or 33.75% of permit fee + permit extension fee Request for refund on canceled permit if no work done $37.80 $=11),00 Permit research $15.00 per hour Demotr tz .Pet snits Demolition permit Greater of: $7-5,00er $0,023 - f€ i)t :$80,00 or $0.027 per square foot • frit Q4-;25 . , € -iew -commercial projects<$50,000--- -1 .Aeces-sibil.ilk{--insl et t:•i n-&.;...ectlifieat ori..-..- S.141,25--.... € e# :; ; ' ing 5816.75 ..i., S1440 -per ae ...-.... .. site pia a review H:1LEG-DIRILisa12010 OrdinancelFee Table -legislative version8.16.2010.doc 11 w ffl ^. ,i f 1 '�Z pemises— * WIIg.1n,ee , ._ �-ore- - - . tzlty gees Work commenced but not finished Greater of 2X Qerrlmjt fees or investigative fee Work completed Greater of 2X permit fees or investigative fee Miscellaneous Fees — Investigative feet $450.0£3 Re -inspection fee (Per Inspection)' 580.00 S°,eciJ Ln, ectio,Fees Inspections outside City, but within ETJ Inspection fee + $7,5700 5100.00+ $1.83 per mile Inspections outside City and ETJ Inspection fee + $1.83 per mile + $7'5,0 $1.30.00 for each 200 miles Thirdparty inspections when requested by applicant Contract rate + 32% overhead rate Reduced.Fees Reduced fee for public schools, Federal, State, county, municipal Greater of: H:1LEG-DIR\Lisa12010 Ordinance\Fee Table -legislative version8.16.2010.doc 12 governments and other political subdivisions with ad valorem tax status 50% of regular permit fee or minimum fee ircchilolo.,),' ' 2.5%.X building Pes I prinit Minimum fee 7O0 8a,00 .70% of Valuation TABLE INSET: ELECTRICAL PERMIT FEES P7or Stand Alone Permits NoL4ssoei ed wit a Win . emit -Based .,. PW/uation AMOUNT OF FEE R.csiden ti al 0,52% of Valuation Commercial $0 to $5 Million .70% of Valuation $5.001 to $ M I 0 illn . of 65%io Valuation $ 10.001 to $20 Million ,60% of Valuation S20.001 Milliont.o $50 Million. .58% of Valuation 44- .., A.,: • • ,: . Kir .i.4., .• ° '' . - .,- --. A -if -een{litioner -- Apptianees-(tnish- vt-nlipacto vs.Fdi.sistwasherolisposerrgafbage-.di.sposti4 etc.) Cirettits•••(iiiellidiiig-eHten-siolaFratid-miairs) [The-tel,m2leifetiits1141efein: 1T}eans-ead+-main4edef, sti4--tpain-of4wan-oli-eifouil4er-eleardefil .: • , , • - .: S6,75 1-1:\LEG-DIRILisa\2010 Ordinance\Fee Table -legislative version8.16.2010.doc 13 t+ d.00nric er :€l: as--a-septicae--C -e it -r ithit ..41e -t rens-o:# lhis--;gec#-iona...-.... // ✓675 .. .r ft�— :Equipment ..tno it -ptE`-tu'e.. 3il3j{`'etk : i:-ia's'-t:' ictf=:i ine-or lovat r. - S-30,04--- . �(' -�_ �... - �O 1 " ,[, a f ♦t [, �y. y.,y } l •'-tin equipu e -4 (electric) -- fti-rnae 3 .. ia,• unitsTa- id- e -- irk ler- eater s-.....-per-:3--k"4 of`..fraction t lt:fe(} ......- i:l,vrltfni; Lt}till'nier :. .'r and hot \vat( i eat s--- $13.50 ... $I..{ n. ..♦ .50 7ef ``iees.-1-0-1-to-2.0ti.ryis - -975.8 _-- Y 4e (change a pat :;i out) Get r—epi3its-;--addit:ional-le -for..wofk-not`ii chided }I ,. li-i f-the-ahav - %y'7-1:Ot1... :N.eW--I E eritl&l--(:ofStf'f E-tit:i.:,.....-. Eke etf square foot of lei riecil--p nnit S(ar aec,essef -r sidential..e o struction-.--- ' 0 064.5 --fir • o building ark_a Re inspection$ -7,54.}l}---.- out Replacement license $-4441-----. 25.00 ..l-� -; if n 01ooy-fce-- ..... Minimum fee $75,00 ...... -$ t).09. `l'A.i3l..l: INS} H:ILRG-DIR\Lisa12010 OrdinancelFee Table -legislative version8.16.2010.doc 14 -ENER-GY--€XASERVATION-FEES- - Fuel Gig lees for Stared StarulAlone Permits .NOTAssociated withWino Pert 't Residential 0.52% of Valuation Commercial A:M(1)1.1'NT ()F-1,"-.Efi- -- .70% of Valuation 6 II! ' ' 4•11•46 4 • 4 •60% of Vilulti on 4 . ......' . ...V l'.14.61,....G-AS FEES - , , L., DC 11 -gas-serviee..---1.-Frst 1-eter-loop3-pef- meter ..... . S.6-..--7-5---- E-a€4i :.•11 a€1dk. r--1-e-ei..).---- •• ,. ,, V I $6,7-5.--- Fuel Gas Fees Fuel Gig lees for Stared StarulAlone Permits .NOTAssociated withWino Pert 't Residential 0.52% of Valuation Commercial SO to $S Million .70% of Valuation S5.001 to $1.0 Million .65% tYr Vaivation $10 001 to $20 Million •60% of Vilulti on $20.001 to $5() Million • 584 0 r Yg 1 llAtigt:1 l'.14.61,....G-AS FEES - AMOUNT OF -FRE L., DC 11 -gas-serviee..---1.-Frst 1-eter-loop3-pef- meter ..... . S.6-..--7-5---- E-a€4i a€1dk. r--1-e-ei..).---- Each -gas -Iirw.---1-.1e-w-distrit)uti on-- $6,7-5.--- 'ine distribution $6.75 replace Each -gas -line• --replace service— S6,75 Each OM: -.. • .•;6-..=-,1,5--- gas -14aeli- gas- fireplace-igniter/log -sot-- $677-5 --- $6.75 Each-gas-Coraaee -- $6,7,5--. Each gas heater - $.6,75 - &let • ' • $6.75 gn,;14 • . Eacli-ga&-pool heater— $6,76 --- Each gas-wall-farnaec -unit-- $4,7-5--- Gaspermilj6r-new-reNidential -eorairiff-tion. - $0,0675..per-softife-jboi.ofelmiltiliT HALEG-DIRTisa12010 OrdinancelFee Table -legislative version8.16.2010.doc 15 TABLE INSET: Me anicat Permit Fees ;1. echanical. Permits ees :' or° Sti nd .Alone Permits NOT Associated witli a Buiidin4 Pl'.rrnit Residential 4524 o... Valuation Gek :x S() lco 5 Million -re.sidcnlial A iniJnwn.li'e%= $10.001.._to,._$2() Million .6O% of Valuation 4)-(k $S.0...()Q TABLE INSET: Me anicat Permit Fees ;1. echanical. Permits ees :' or° Sti nd .Alone Permits NOT Associated witli a Buiidin4 Pl'.rrnit Residential 4524 o... Valuation Commercial S() lco 5 Million .i()% of Valuation. $5.001 to $14) Millionl ,65% of Valu tion $10.001.._to,._$2() Million .6O% of Valuation $20.0()1 to $y() Million .58% of Valuation ..,..,.rt`R.,k CCA -YA'i:. FEES .. :1 stz Elation 4 t- lit)w- `>;-i icing- lea iilg. 't:t7ti rtin ,,.9..,t.. ,..t _..air -co idition aid....ef=riger #:ic x}-sys£ ii s--... .$'.:3:( ).,.,,i::..$' :-0. per $.1 -1(i--i.t-valtxat tf-._.... ` e • � 43.c.�„ i r'igera'tie -sy t i:s...... �. .. .. `61-;-000--n- luatio --- 33,0()0 B`I'l.i (1 :RI3).>-334 tali BSI:[') , ,00t {.i() >w 3.0.000_l 'l:l ....{-1.t3-BlE. *- - $9045---- . f ot-C"{3ni lin-any-. i£ztAng..!e tilati ni is tet,...E:fdt"-.Gonditi(3i'71Yfs4x- n, refilr;#(lpalion-:ysiCsin5,,a e' -eve; ?: de it ----- imiL- f 4mil-dii -area- inrt,for accessory residential iii <:, :..- ix3 -.f - lE i ,x -,✓wee - Temporary operation inspection $ ti.00 S80.00 H:1LEG-D1R1Lisa12010 Ordinance\Fee Table -legislative version8.16.2010.doc 16 ,fee .ffrpriiitAes--- Minimum fee $75.00 $80.00 Commercial Plumbing Code Fees Plumbh ;: PermztsF"e s or Stand '1/one Per ' iis V ' 'Ass do et tili a Bui dino Permit Residential 0.52% of jaluation Commercial $0 to $5 Million .70% of Valuation $5.001. to $10 :Million .65% of \initiation $10.001 to $20 Million „60% of Valuation 20.001 to $50 Million .58%of Valuation --44,44-M-RING-GOD-1— AMOUNT OF -FEE ---14tinabiiag. perinit-fe.e-teept-for-ne-w-residential censtatotierE--- Fiaa-water.-Elistri4tition.--new.-(ifiside)--- , $6.75 new (out„..;ide) Eac-li-water-se-Mee--repla-ee-(etitside). --. $6,75- • -,: - .•. - b6.75 • P '. 7?"' $6.75 Lacisi-lavatofy---. ., Eash-sifik— $6,7-5 Eaell-slop-sink— $6,7-5--- 6.75 Eaell-titina1— .$6,75-- H:ILEG-DIR\Lisa12010 OrdinaneeTee Table -legislative version8.16.2010.doc 17 Each-water-eleset.--- $6775 Each boiler $6,75 gte, ° $6.75 Each..-ee . ',#lig-t{?:yf::er-.,..,.., -.-- $20,-2.5--- i_ ae }..4is1lwa Chef-...... 7-...-,... $6,7-5--.... t -linking fo unI din :,acj,1, ;[-6( jc Eac 'J?-- $6,7-5 1 e€ trig- et-wiitei'.- eatf' --... $6..75,._.. Gas hoot heater $6.75 water. @a4il1- oo -heath'- -- $.6,7 -5 --- Each $6.75 pump -wh $6:7.5---- w'ashl`'� , ti 3ii3E i ll-' m'at't- €:"E ii.. .--i3ilking-mae liiiti `'s.(}:75........ .tuner $6.75 _;a 11 3i=inkli.r..,ilnd--.}i'ligatio-R-s stern!,s,- er.-..4�000..- uare .73 ,r .4ch catch. basin .75 $31.73 H:1LEG-D1121Lisa12010 Ordinance\Fee Table -legislative version8.16.2010.doc 18 l aeli-grease-intefeept ti•....... $3-1,7-3— $3-1-.-7-3 -..Each. Classification Eachhut~ drain. 75 House mover None $133.00 Each lin station— 7 $135.00 Master electrician -sign $75.00 $135.00 1 h 4 ''::., -Fe -drain t' u{. i- i -an ..t a 3.......... $34 3 Z...,...-. IF:irst tunnel--- $':-9.44 1- a . additiem tunnel ..,..... $4.&20-....-- s'.e- -F si 4: e t:i i ....e. }iT4 i etie i.,--.,.. • Iurnhin y, permli; -l.£.f io1Xr:_yesiddontFa no i};ii:ictioi:}.,..,..,.. S f sktua 43E3t E Plumbing.-eisi}Z1{..:fer..aecessnl-..re'siC ential—e 3n stFuction.... . .- Minimum Fee $75.00 $80.00 .Backflow Prevention Backflow prevention device test filing fee $4-5-.44—$20 00 Minimum fee $75.00 $80.00 TABLE INSET: LICENSE FEES Classification Examination Fee License Fee House mover None $133.00 Master electrician $75.00 $135.00 Master electrician -sign $75.00 $135.00 H:1LEG-DIR\Lisa12010 OrdinancelFee Table-Iegisiative version8.16.2010.doc 19 Master electrician -elevator $75.00 $135.00 Journeyman electrician $75.00 $30.00 Maintenance electrician $35.00 $30.00 Limited journeyman electrician $75.00 $30.00 Apprentice None $25.00 Certified electrical maintenance person $30.00 None TABLE INSET: CONTRACTOR REGISTRATION FEES AMOUNT Mechanical contractor $135.00 Plumber $135.00 Lawn irrigator $135.00 Backflow prevention assembly tester $135.00 SECTION 2. If for any reason any section, paragraph, subdivision, clause, phrase, word or provision of this ordinance shall be held invalid or unconstitutional by final judgment of a court of competent jurisdiction, it shall not affect any other section, paragraph, subdivision, clause, phrase, word, or provision of this ordinance, for it is the definite intent of this City Council that every section, paragraph, subdivision, clause, phrase, word or provision of this ordinance be given full force and effect for its purpose. SECTION 3. Publication shall be made in the official publication of the City of Corpus Christi as required by the City Charter of the City of Corpus Christi. SECTION 4. That all ordinances or parts of ordinances in conflict with this ordinance are repealed. SECTION 5. This Ordinance takes effect October 1, 2010. H:1LEG-DIR\Lisa1201D OrdinancelFee Table -legislative version8.16.2010.doc That the foregoing ordinance was read for the first time and passed to its second reading on this the 0,1:66- day of , 2010, by the following vote: Joe Adame Chris N. Adler Brent Chesney Larry Elizondo, Sr. Kevin Kieschnick Priscilla G. Leal John E. Marez Nelda Martinez Ascev/- Mark Scott That the foregoing ordin nce was read for the second time and passed finally on this the 31- day of „Gat" , 2010, by the following vote: Joe Adame Chris N. Adler Brent Chesney Larry Elizondo, Sr. Kevin Kieschnick PASSED AND APPROVED this the egday of , 2010. ATTEST: Priscilla G. Leal John E. Marez Nelda Martinez Mark Scott Armando Chapa City Secretary APPROVED as to form: By: Lisa Aguilar, Assistant City Attorney for the City Attorney Joe A. me Mayor 0287,6 EFFECTIVE DATE fotivicrA.1),,,101D State of Texas County of Nueces } } PUBLISHER'S AFFIDAVIT CITY OF CORPUS CHRISTI Ad # 5949508 PO # Before me, the undersigned, a Notary Public, this day personally came GEORGIA LAWSON, who being first duly sworn, according to law, says that she is LEGAL SALES REPRESENTITIVE AND EMPLOYEE OF THE PUBLISHER, namely, the Corpus Christi Caller -Times, a daily newspaper published at Corpus Christi in said City and State, generally circulated in Aransas, Bee, Brooks, Duval, Jim Hogg, Jim Wells, Karnes, Kenedy, Kleberg, Live Oak, Nueces, Refugio, San Patricio, Victoria and Webb Counties, and that the publication of, NOTICE OF PASSAGE OF ORDINANCE NO. 02875 which the annexed is a true copy, was inserted in the Corpus Christi Caller -Times on the 9/6/2010, 9/6./2010. $ 242.25 1Time(s) On this day of is a true and an exact cosy made by publis1 er. LEGAL SALES EPRESENTIVE t-201° I certify that the attached document GWENN J. MEDINA MY COMMISSION EXPIRES August2,2012 Not Lry Public, State of Texas :113 G -t.7 fi CL 5-5ti95Og September:6.2010,» CALLER -TIMES `NO110E OF PASSAGE;OF ORDINANCE :1,19421.375.4,:,", Amending Cfr "1 Deve[oprnent Ser vices," Art,Xil:f_ pevelopmeti Ser+- vices',Pees, f iy 1 "Technical Gonstruc.;y tlon Code 0ess' Seat :1,4iSt72 "Star) < psi/ar�iizej dpBuiIdrng` 1 Ya :t1oti, ipso i 14 1lb4 Processrn ti. And, Pian Revleti Fee"; Sect 14=130ff "Speclal Fees ;.Sect" i4 ' 13p7, "Aeduoe Fees , Sect 1413121, Accounting', &'SSec 141313 Technice� Cbnstruot;ohl Cod Fes S,chedulce" o; the Code of.Ord City of<Qor}1us'Chrls ti, to provide top minimum perrriit fees simplified methods te; calculate Suiidrrt•! Permit Fede,'&.: ple, Review Fees, to 15ro vide .for expedfle.s Plan eview by'irite nal 8t ff, to prod... for. customized:Pia `E Revlew to ,provrd'w disaoirt►t$ of 'l=ees- t�E Permit. Molders :.mao +nr4t?5cert.ai regt�rr mems, to pro'i' vide ,_for Speci.a.t inspections an 0-00r standard Iays;.ar, j�ogrsk t¢ provide fo ert C0(60es Af corn: ppihtI' tt to. Sh'el Buildings' tc provlds for Fetes for Con struction Site Offices Foee`fgr both stars lord duplicat Certificates -of Accu 'Ran cy Faes•fa.' TerrrPOI: ar�r Event,s' Penalty Fess; In'= spectiohs Outelde of the Cityy t.imlts;>Eiec: trlcarpe:imit Fees', Piumi +rtg Perni.R Fees, .,Machan co -i Permit:Fees, :Fuel Gas. Per.rfiit,,fees' SwlmY muig ;,Pad'I. Fees, &:` providing for Fees fo.r existing ap- plications made;prlor. to pthe effeotive date; Xoviding a repealer p clause;: andprovidingg an effective date o'# Octoberl, 2010. : /slArrnandq Chap e rete