HomeMy WebLinkAbout028756 ORD - 08/31/20101
ORDINANCE
AMENDING CHAPTER 14 "DEVELOPMENT SERVICES," ARTICLE XIII, "DEVELOPMENT
SERVICES FEES", DIVISION 1, "TECHNICAL CONSTRUCTION CODE FEES", SECTION
14-1302, "STANDARDIZED BUILDING VALUATION"; SECTION 14-1304, "PROCESSING
AND PLAN REVIEW FEE"; SECTION 14-1306, "SPECIAL FEES"; SECTION 14-1307,
"REDUCED FEES"; SECTION 14-1312, "ACCOUNTING"; AND SECTION 14-1313,
"TECHNICAL CONSTRUCTION CODE FEE SCHEDULES", OF THE CODE OF
ORDINANCES, CITY OF CORPUS CHRISTI, TO PROVIDE FOR MINIMUM PERMIT FEES,
SIMPLIFIED METHODS TO CALCULATE BUILDING PERMIT FEES AND PLAN REVIEW
FEES; TO PROVIDE FOR EXPEDITED PLAN REVIEW BY INTERNAL STAFF; TO PROVIDE
FOR CUSTOMIZED PLAN REVIEW; TO PROVIDE DISCOUNTS OF FEES TO PERMIT
HOLDERS MEETING CERTAIN REQUIREMENTS; TO PROVIDE FOR SPECIAL
INSPECTIONS ON NON-STANDARD DAYS AND HOURS; TO PROVIDE FOR
CERTIFICATES OF COMPLETION TO SHELL BUILDINGS; TO PROVIDE FOR FEES FOR
CONSTRUCTION SITE OFFICES, FEES FOR BOTH STANDARD AND DUPLICATE
CERTIFICATES OF OCCUPANCY, FEES FOR TEMPORARY EVENTS, PENALTY FEES,
INSPECTIONS OUTSIDE OF THE CITY LIMITS, ELECTRICAL PERMIT FEES, PLUMBING
PERMIT FEES, MECHANICAL PERMIT FEES, FUEL GAS PERMIT FEES, SWIMMING POOL
FEES; AND PROVIDING FOR FEES FOR EXISTING APPLICATIONS MADE PRIOR TO THE
EFFECTIVE DATE; PROVIDING FOR SEVERANCE; PROVIDING A REPEALER CLAUSE;
AND PROVIDING AN EFFECTIVE DATE OF OCTOBER 1, 2010.
SECTION 1. Code of Ordinances, Chapter 14, Development Services, Article XIII, Development
Services Fees, is amended by revising the Article to read as follows:
"Division 1. Technical Construction Code Fees.
Sec. 14-1301. General requirements.
(a) Fees required. A fee must be paid for any installation, alteration, addition, change, or repair that
requires a permit under the technical construction codes.
(1) A permit may not be issued until the prescribed fees have been paid.
(2) An amendment to a permit may not be released until any additional fees, due to an increase in the
estimated cost of the building, structure, electrical, plumbing, mechanical, gas, or energy conservation
systems, have been paid.
(Ord. No. 25467, § 1, 9-9-2003)
Sec. 14-1302. Standardized building valuation.
(a) The standardized building valuation system to be used to compute construction permit fees will
consider the total value of all construction work, including plumbing, electrical, paving, parking,
driveway approach, energy conservation, fuel gas, mechanical equipment, and other systems, including
appurtenances and site improvements, materials, labor, contractor's profit and overhead.
(1) The valuation of building, alteration, or structure used in computing building permit fees will be
based on, and at least equivalent to, the latest standardized building valuation data as published by the
H:\LEG-DIR\Lisa12010 OrdinanceWFee Table -legislative version8.16.2010.doc
028756
INDEXED
2
International Code Council Building Safety Journal, as adjusted by the latest regional construction cost
adjustment factors published annually by Engineering News Record. The building official may
alternatively accept a comparable valuation submitted by the applicant. The applicant's valuation shall be
verified against the Elimination of Architectural Barriers Report, if one is required, and the higher of the
two (2) valuations shall be used. In the event the Elimination of Architectural Barriers Report valuation is
not available prior to issuance of the permit, the Elimination of Architectural Barriers Report valuation
shall be confirmed prior to conducting the final inspection. If additional permit fees are required, the final
inspection shall not be passed until all fees are paid. If no Elimination of Architectural Barriers Report is
available, the building official may refer to the latest standardized building valuation data as published by
the International Code Council Building Safety Journal, as adjusted by the latest regional construction
cost adjustment factors published annually by Engineering News Record.
(2) The applicant for a construction permit may appeal any determination of the Building Official to the
building code board of appeals.
(3) Standardized building valuations required pursuant to paragraph (1) will be used as the basis for
pai permitting of a project, such as for the foundation, shell, and interior finish phases.
(4) Standardized building valuations required pursuant to paragraph (1) for pre-engineered metal
building warehouses must be values derived pursuant to paragraph (1).
(5) Standardized building valuations required pursuant to paragraph (1) will be derived from the latest
data published by International Code Council Building Safety Journal and Engineering News Record and
adjusted based on the regional multiplier published by the International Code Council.
(6) The standardized building valuations referred to in paragraph (1) are adopted by reference and
declared to be a part of this section.
(7) If, in the opinion of the Building Official, or the Building Official's authorized representative, the
valuation of a commercial building, alteration, structure, electrical, energy conservation, fuel gas,
mechanical, or plumbing systems appears to be underestimated on the application, the permit may be
denied, unless the applicant can show detailed estimates or appraisals that meet the approval of the
Building Official. Alternatively, the Building Official may set the permit valuation pursuant to the
standardized building valuation data adopted in paragraph (1), and issue the permit with a fee based on
that valuation. Permit valuations must be based upon total construction cost, such as electrical, energy
conservation, fuel gas, mechanical, plumbing equipment and other systems, including materials and labor,
site improvements, contractor's profit and overhead.
(b) When determining the value that is applied to the fee schedule, values are rounded up to the next
higher one thousand dollar -valuation category.
Sec. 14-1303. Calculation of building area for residential construction.
(a) Except as provided in subsection (b) of this section, building area includes all rooms and spaces
within the main structure, except for attached (1) covered patios open to the environment and (2) front
and rear porches open to the environment.
(b) The building area for residential roofing/re-roofing includes attached garages, covered patios open to
the environment, and front porches and rear open to the environment.
(c) Accessory residential construction includes room additions, storage rooms, utility rooms, garages,
carports, patio covers, raised decks, skate board ramps, greenhouses, portable buildings, gazebos, and
other similar uses.
Sec. 14-1304. Processing and plan review fee.
(a) A processing and plan review fee must be paid in addition to the regular permit fee as in the fee
schedule published in Table 13-1.
H:1LEG-DIR\Lisa12010 OrdinancelFee Table -legislative version8.16.2010.doc
3
(b) The plan review fees must be paid at the time application is filed for each application processed and
reviewed for the purposes of obtaining a permit as required by the technical construction codes, including
except:
(1) New construction (both commercial and residential).
(23 Additions.
(3) New interior commercial tenant spaces.
(5) Detached accessory buildings greater than or equal to four hundred (100) square feet in area.
(7) Rehabilitation of moved wings -(genera repairs). The fcc for the rehabilitation of moved buildings
1. Permits categorized over the counter as deemed by the Building Official. An official list will be
published each calendar year.
(d) (c) Plan review fee is non-refundable.
(e) � A third party plan review or inspection may be requested by the applicant at the time the
application is filed. The fee for a third party plan review or inspection requested by the applicant pays the
costs of services of an approved third party consultant and the applicable overhead rate. The fee for a
third party plan review requested by the applicant must be paid at the time the application is filed. The fee
for a third party inspection requested by the applicant must be paid prior to the inspection. The fees for
third party plan review and inspection requested by the applicant are listed in the fee schedule in section
14-1313. Third party consultant contracts are available through the development services department.
(e) Expedited plan review by internal staff may be requested by the applicant at the time the application
is filed. The expedited fee is payable at the time of application submittal according to the fee schedule
published in Section 14-1313. Expedited Plan Review does not constitute an approval of submitted plans.
(f) Customized Plan Review.
1. Customers who desire expedited approval may schedule a meeting with the Plan Review
Coordinator and staff in order to obtain the necessary permits for the submitted project.
Customers must be accompanied by their design professional(s), (engineers, contractors, owners,
or any else) who may make on the spot corrections, changes or decisions necessary to address all
of the deficiencies on the plans.
2. Submitted plans must be ready for permit issuance.
3. If all plan deficiencies can be addressed, a site/foundation permit has or can be issued, a
Contractor has been hired and is present, and all fees paid, then a Building Permit will be issued
at the end of the customized plan review meeting.
4. If some issues cannot be resolved at the Customized Plan Review meeting, but can be
addressed at a later date, another Customized Plan Review meeting will not be required. Once
the issues addressed, a Building Permit will be issued to the contractor.
Sec. 14-1305. Minimum fee.
In the event the total fees, under the applicable fee are less than designated minimum fee, the minimum
permit fee applies.
Sec. 14-1306. Special fees.
(a) Re -out inspection. A re -out inspection fee is required for the purposes of obtaining a temporary
and/or permanent electrical release.
H:1LHG-DIRILisa12010 Ordinance\Fee Table -legislative version8.16.2010.doc
4
(1) A separate re -out inspection fee will not be charged when a certificate of occupancy fee has been
paid.
(2) If the re -out inspection is performed concurrently with the electrical permit inspection, and the
electrical permit fee has been paid, a separate re -out inspection fee will not be charged.
(b) Failure to obtain permit.
(1) The applicable surcharge and investigation fee must be paid to help defray the additional cost of
inspection for work that has already been done, before the required permit is issued.
(2) The surcharge is not a penalty, and does not precludes any other remedies available to the city to
enforce the technical construction codes. The collection of the surcharge and investigation fee made is to
help defray the cost of additional inspections and administrative time to research and issue the required
permits.
(3) The surcharge and investigation fee is not required for emergency work commenced under section
14-215(f). However, if the required permit is not obtained within twenty-four (24) hours, excepting
weekends and holidays, the permit fee must be doubled or the surcharge paid, whichever is greater.
(c) Re -inspection fee . When a re -inspection fee has been assessed under section 14-222(g)(1), re-
inspection fee must be paid.
(d) Survey fee . A survey fee will be collected for fire surveys, code compliance surveys, construction
status surveys, building evaluations, repossession surveys, etc.
(e) Relocation surveys . A relocation survey fee will be collected for performing relocation surveys to
determine the minimum code compliance requirements for structures proposed to be relocated (moved)
and placed back in operation.
(f) Permit research . A permit research fee will be collected for research to provide verification of legal
descriptions, property dimensions, ownerships and/or other construction related data from permit files,
etc. The cost of duplication of documents will be charged as allowed under the Texas Public Information
Act.
(g) Inspections outside the city . Additional fees will be charged for inspections made outside the city
limits.
(h) Administrative fee for permit extension . When an extension of a permit is required, an
administrative fee must be paid before the extension is granted.
(i) Renewal of expired permit . The holder of an expired permit, who desires to reactivate the permit and
has performed work under the permit, must pay the administrative fee for a permit extension and an
the minimum re inspection fee in accordance with the permit fee schedule.
(j) Re -inspections . The permit holder or his agent must pay a re -inspection fee in accordance with the
permit fee schedule, prior to a re -inspection. A re -inspection is required when:
(1) It has been found that the portion of the construction for which an inspection was requested is not
ready for the inspection.
(2) Corrections that were called for have not been made.
(3) The premises are not made readily available for inspection.
(4) The work, construction, installation of wiring, piping, or other equipment or systems is found to be
faulty or incorrectly or defectively installed.
(k) Certificate of occupancy for existing buildings. When an application for a new certificate of
occupancy for an existing building or space is made, a processing and compliance investigation fee must
paid at the time of application.
(1) Duplicate certificate of occupancy . In the event that a certificate of occupancy is lost or destroyed, a
duplicate certificate of occupancy may be issued provided that a fee is paid in accordance with the permit
fee schedule.
(m) Technology fee. The technology fee- is used to fund computer equipment and other technologies for
inspectors.
H;1LEG-DIR\Lisa12010 OrdinancelFee Table -legislative version8.16.2010.doc
5
En (m) Multiple plan review fee. After the second plan review of corrections submitted in response to
plan review comments, an escalating fee will be assessed for each subsequent submission up to the total
amount of the plan review fee. Partial responses shall be treated as additional responses following the first
partial response in resubmission. Applicant may appeal the fee to the building official or assistant city
manager for development services to review and determine if comments to applicant were legible,
accurate, and reasonably understandable. If the building official or assistant city manager for development
services determines the comments to be faulty no fee will be assessed.
Sec. 14-1307. Reduced fees.
(a) Permit and survey fees for public schools, federal state, county and municipal government and other
political subdivisions having ad valorem tax exempt status, and for churches and all other state
constitutionally exempted ad valorem tax entities is fifty (50) per cent of the regular permit fee; if the
building and land on which the building is situated is owned and used by the tax exempt entity. However,
a reduced permit fee may not be less than the minimum fee regularly charged. A reduced fee may not be
paid when work has been commenced without proper permits.
(b) Permit and sum+ fees for buildings within renewal community aro fifty (50) per cent of the regular
permit fee. However, a reduced permit fee may not be less than the minimum fee regularly charged.
(b) Discounts of stated fees of 2% will be made for both residential and commercial permits for the
following:
1. Adherence to all permit holder responsibilities as listed in Chapter 14.
2. Electronic submittals of plans and related documents.
3. Submittal of master plans.
Sec. 14-1308. Refunds.
(a) Canceled permit. A permit may be canceled upon written application by the applicant at any time
within two (2) months of the date of the issuance of a building permit or within two (2) months of the date
of issuance of any electrical, mechanical, or plumbing permit. If no work has been done under such
permit, the permit fee may be refunded when formally requested in writing by the applicant, provided that
the city must retain a cancellation fee to cover the cost of auditing the fee and preparing the request for
refund. In all other instances regarding any fees for which a refund is requested due to contract default,
lease cancellation, or other similar circumstances, the city must retain the minimum permit fee to cover
the cost of auditing the fees and preparing the request for refund. Plan review fees are non-refundable.
(b) Multiple plan review fee appeal. A refund may be requested upon written application by the
applicant after an appeal has been made to the building official or assistant city manager for development
services and approved by either one.
(Ord. No. 25467, § 1, 9-9-2003; Ord. No. 027645, § 4, 4-8-2008)
Sec. 14-1309. Reserved.
Editor's note: Ord. Ne. 027 45, § 8, adopted Apr. -8, 200 , repealed § 14 1309, which pertained to fees
rounded off and derived from Ord. No. 25467, § 1, adopted Sept. 9, 2003.
payment is made.
Sec. 14-1310. Fees for examinations and licenses.
H:ILFG-DIRILisa12010 OrdinancelFee Table -legislative version8.16.2010.doc
6
(a) The required examination fee for a license to qualify electricians of all classes must accompany the
application for a license.
(b) Any required license fee must be paid before the issuance of a license.
(c) The license fee must be paid annually. Licenses are valid for only in the calendar year in which the
fee is paid. A license is not valid unless and until the license fee has been paid for the calendar year.
(d) Duplicate licenses may be issued to replace a lost or destroyed license, if the license holder presents
provided satisfactory evidence that the license was loss or destroyed, and the licensee pays the fee for the
duplicate license.
Sec. 14-1311. Contractor registration fees.
An electrical, mechanical, plumbing contractor and a lawn irrigator or backflow prevention assembly
tester must pay an annual registration fee to maintain a current status as a registered contractor. Individual
who holds multiple registrations must pay separate fee for each registration.
Sec. 14-1312. Accounting.
(a) The building official must keep a permanent accounting of all permit fees and other monies
collected, the names of all persons upon whose account the fees were paid, along with the date paid and
amount of the fees.
(b) A periodic financial audit of fee revenues and expenditures shall be conducted. The audit shall occur
not less than once every three (3) years, but annually in the 2008 2009 and 2009 2010 Fiscal Years. The
audit shall include a report of fees that are authorized to be collected, the amount of each authorized fee
that was actually collected, and the amount of fees that should have been collected. The audit shall also
provide a detailed accounting of the uses of the fees. The audit shall make any recommendations for
improvements or corrections. The audit shall include a report on the amount of fees that need to be
collected in order to make the development services special fund independent of subsidies from the
general revenue fund.
Sec. 14-1313. Technical construction codes fee schedules.
The following fee schedules apply to activities under article II of this chapter:
TABLE INSET:
PLAN REVIEW
FEES
AMOUNT OF FEE
R sidtnt al -I; la}
i.i4:e tei,4 {.`
$19.25pr 24S0.021
;1313}} of 1r` l- l }]
G'reate:f -a :.
.'' of building pei- .e Y.' ' :','
building fee Si
t��
review
ef perrnit .tb nex.0 ol} . e .. .i!
pe - i -t -fee -for at:y \'aluauicm - ;OO M4(4)
Plan Review Fees
(leased as a percentage of the Building. P'rnzrt Fee)
RESIDENTIAL
25% of the Building Permit Fee
H:ILEG-DIRILisa12010 Ordinance\Fee Table -legislative version8.16.2010.doc
7
COMMERCIAL
40% of the Building Permit Fee
RESIDENTIAL
0.52% of
Multiple plan
review fee
15% of original plan review fee for third review submittal; 30% of original
plan review fee for fourth review submittal; 45% of original plan review fee
for fifth review submittal; 60% of original plan review fee for sixth review
submittal; 75% of original plan review fee for seventh review submittal;
90% of original plan review fee for eighth review submittal; 100% of
original plan review fee for ninth and above review submittals
Third party plan
review when
requested by
applicant
Contract rate + 32% overhead rate
.Expedited Plan
150% of the Hal Review Rate
.Review (Internal
Staff)
Customized. Plan
150% of the Flaw. Review Rate . lits $1.50.110 er hour with a two-hour
Review ew
m.iu i IT1t:i1Ti.
TABLE INSET:
BUILDING PERMIT FEES - S80,00 Min., Permit..,;ee
AMOUNT
OF FEE
RESIDENTIAL
0.52% of
Valuation
COMMERCIAL
4_ om ertia l-batil in4,..,. itl.ta#-1....-:.-.:.. .-. 8-_00G----
$75,00—
7:5 -.00........$:7
Commercial building >-$7k000 . s $2%1,000---
-'-
S-3-7,80+
-l4)
$6,07 -5 -pct°
$6,
$1: {)
valwition
valuation
evef
$2,00()
='.-. ., . ; .. :.,.-.. ,.: 34) ti -;1 10,004
$4.474-5
.7'1,45 --per
$1-,11(141
valuation
ation
11:ILEG-DIR\Lisa12010 OrdinancelFee Table -legislative version8.16.2010.doc
8
HALEG-DIR\Lisal2010 OrdinancelFee Table-legislativc version8.16.2010.doc
$20.5000---
Commereial-building-valuati-on-->=4-1-4-4;000--
$.-5-034
$2,025 -per
' Con
f,t.i-t
evef
$110,-000
SO to $5 Million
70% of
Valuation
$5.001 to $10 Mil.lion
Vaittati On
S 1 0.00 1 to $2() Million
60% of
'Valuatio .1
$20.001 to $50 Million
.58% pf
Valuation
Construction site offices
$45.90
-$80.00
L
4! S
Sign
$108.00
HIM -deal Permit for Signs, per transformer
$6.75 Min
Fee S8().00
Residential construction building permits
New one- and two-family dwellings, apartments,
Accessory buildings. Remodel, and :Repail
townhouses, condominiums,
stieare-feet
(yir
14,144 -Pit
0.52% of
Valuation
for
(- ential construction
Accessory-N.sidtntial-eon&truetion-for-structures>,=-104-square--Poct- ..... .
per
cy-Kteval--residelitial-ealIS.tftletif311--afid-re,pairs---
HALEG-DIR\Lisal2010 OrdinancelFee Table-legislativc version8.16.2010.doc
9
Residential — Other
House moving permit
$467.00
Swinrrniug Pool
'0 { 5
Relocation survey
Roofing. and SidingS.0
S,044--s-q7-ft
Sc_lt.z..,
rivewav.
disci.pli:c
$80.00
Re -out inspection to establishelectric rrl_service in lit home wherc_nc service hers.
c tr'5t€din thy'previous 90 days
;P -y.:- 4._..-
$80.00
.. .. -
r75.00
jj E )y^( }
S�3.-Y�+)�4l.'..1...5{13e{'.�.�(�
TABLE INSET:
Fees for Moving structures — Both Residential and Commercial
House moving permit
$467.00
Traffic engineering moving route sheet
$61.00
Relocation survey
$110.25
Survey fee (14-306(d))
$0.10 per
disci.pli:c
o
-x1.40.00
Mobile home/HUD-code manufactured housing installation permit
$106.50
TABLE INSET:
MISCELLANEOUS CONSTRUCTION FEES
Certificate 2 . a c i
Qcc
Certificate of occupancy for change of use of existing building or structure
X21. 00
Duplicate certificate of occupancy/Certificate of Completion
$0.10 per
page
125,00
H:1LEG-DIRILisa12010 Ordinance\Fee Table -legislative version8.16.2010,doc
10
Temporary events
Temporary event permit w/o food service
$64.80
-$89310
Temporary event permit w/ food service
$199.80
Miscellaneous Fees
-AMOUNT-OF-FEE-..-...-
MQ1-JNT--OF-..,T..E-.-..Greater
Permit extension
Greaterof:
$80.00 or
33.75% of
permit fee
Renewal of expired permit
Greater of
$7-54)0 •
$80.00 or
33.75% of
permit fee +
permit
extension
fee
Request for refund on canceled permit if no work done
$37.80
$=11),00
Permit research
$15.00 per
hour
Demotr tz .Pet snits
Demolition permit
Greater of:
$7-5,00er
$0,023 -
f€ i)t :$80,00
or $0.027
per square
foot
• frit
Q4-;25
. , € -iew -commercial projects<$50,000---
-1
.Aeces-sibil.ilk{--insl et t:•i n-&.;...ectlifieat ori..-..-
S.141,25--....
€ e# :; ; ' ing
5816.75 ..i.,
S1440 -per
ae ...-....
.. site pia a review
H:1LEG-DIRILisa12010 OrdinancelFee Table -legislative version8.16.2010.doc
11
w
ffl ^. ,i
f 1 '�Z
pemises—
* WIIg.1n,ee , ._
�-ore- - - . tzlty gees
Work commenced but not finished
Greater of
2X Qerrlmjt
fees or
investigative
fee
Work completed
Greater of
2X permit
fees or
investigative
fee
Miscellaneous Fees
—
Investigative feet
$450.0£3
Re -inspection fee (Per Inspection)'
580.00
S°,eciJ Ln, ectio,Fees
Inspections outside City, but within ETJ
Inspection
fee + $7,5700
5100.00+
$1.83 per
mile
Inspections outside City and ETJ
Inspection
fee + $1.83
per mile +
$7'5,0
$1.30.00 for
each 200
miles
Thirdparty inspections when requested by applicant
Contract
rate + 32%
overhead
rate
Reduced.Fees
Reduced fee for public schools, Federal, State, county, municipal
Greater of:
H:1LEG-DIR\Lisa12010 Ordinance\Fee Table -legislative version8.16.2010.doc
12
governments and other political subdivisions with ad valorem tax status
50% of
regular
permit fee
or minimum
fee
ircchilolo.,),' '
2.5%.X
building
Pes
I
prinit
Minimum fee
7O0
8a,00
.70% of
Valuation
TABLE INSET:
ELECTRICAL PERMIT FEES
P7or Stand Alone Permits NoL4ssoei ed wit a Win . emit -Based
.,.
PW/uation
AMOUNT OF
FEE
R.csiden ti al
0,52% of
Valuation
Commercial
$0 to $5 Million
.70% of
Valuation
$5.001 to $ M
I 0 illn
. of
65%io
Valuation
$ 10.001 to $20 Million
,60% of
Valuation
S20.001 Milliont.o $50 Million.
.58% of
Valuation
44- .., A.,: • • ,: . Kir .i.4., .• ° '' . - .,- --.
A -if -een{litioner
--
Apptianees-(tnish- vt-nlipacto vs.Fdi.sistwasherolisposerrgafbage-.di.sposti4
etc.)
Cirettits•••(iiiellidiiig-eHten-siolaFratid-miairs) [The-tel,m2leifetiits1141efein:
1T}eans-ead+-main4edef, sti4--tpain-of4wan-oli-eifouil4er-eleardefil
.: • , , • - .:
S6,75
1-1:\LEG-DIRILisa\2010 Ordinance\Fee Table -legislative version8.16.2010.doc
13
t+ d.00nric er :€l: as--a-septicae--C -e it -r ithit ..41e -t rens-o:# lhis--;gec#-iona...-....
//
✓675
.. .r ft�—
:Equipment ..tno it -ptE`-tu'e.. 3il3j{`'etk : i:-ia's'-t:' ictf=:i ine-or lovat r. -
S-30,04---
. �(' -�_ �... -
�O 1
"
,[, a f ♦t [, �y. y.,y }
l •'-tin equipu e -4 (electric) -- fti-rnae 3 .. ia,•
unitsTa- id- e -- irk ler- eater s-.....-per-:3--k"4 of`..fraction t lt:fe(} ......-
i:l,vrltfni; Lt}till'nier :. .'r
and hot \vat( i eat s---
$13.50
...
$I..{
n. ..♦
.50
7ef ``iees.-1-0-1-to-2.0ti.ryis -
-975.8 _--
Y
4e (change
a
pat :;i out)
Get r—epi3its-;--addit:ional-le -for..wofk-not`ii chided }I ,. li-i f-the-ahav -
%y'7-1:Ot1...
:N.eW--I E eritl&l--(:ofStf'f E-tit:i.:,.....-.
Eke etf
square foot of
lei riecil--p nnit S(ar aec,essef -r sidential..e o struction-.---
' 0 064.5 --fir
• o
building
ark_a
Re inspection$
-7,54.}l}---.-
out
Replacement license
$-4441-----. 25.00
..l-� -; if n 01ooy-fce-- .....
Minimum fee
$75,00 ...... -$ t).09.
`l'A.i3l..l: INS}
H:ILRG-DIR\Lisa12010 OrdinancelFee Table -legislative version8.16.2010.doc
14
-ENER-GY--€XASERVATION-FEES- -
Fuel Gig lees for Stared StarulAlone Permits .NOTAssociated withWino Pert 't
Residential
0.52% of Valuation
Commercial
A:M(1)1.1'NT ()F-1,"-.Efi- --
.70% of Valuation
6 II! ' ' 4•11•46
4
•
4
•60% of Vilulti on
4 .
......' . ...V
l'.14.61,....G-AS FEES -
,
,
L., DC 11 -gas-serviee..---1.-Frst 1-eter-loop3-pef- meter ..... .
S.6-..--7-5----
E-a€4i
:.•11
a€1dk. r--1-e-ei..).----
•• ,. ,, V I
$6,7-5.---
Fuel Gas Fees
Fuel Gig lees for Stared StarulAlone Permits .NOTAssociated withWino Pert 't
Residential
0.52% of Valuation
Commercial
SO to $S Million
.70% of Valuation
S5.001 to $1.0 Million
.65% tYr Vaivation
$10 001 to $20 Million
•60% of Vilulti on
$20.001 to $5() Million
• 584 0 r Yg 1 llAtigt:1
l'.14.61,....G-AS FEES -
AMOUNT OF -FRE
L., DC 11 -gas-serviee..---1.-Frst 1-eter-loop3-pef- meter ..... .
S.6-..--7-5----
E-a€4i
a€1dk. r--1-e-ei..).----
Each -gas -Iirw.---1-.1e-w-distrit)uti on--
$6,7-5.---
'ine distribution
$6.75
replace
Each -gas -line• --replace service—
S6,75
Each OM: -.. •
.•;6-..=-,1,5---
gas
-14aeli- gas- fireplace-igniter/log -sot--
$677-5 ---
$6.75
Each-gas-Coraaee --
$6,7,5--.
Each gas heater -
$.6,75 -
&let • ' •
$6.75
gn,;14 • .
Eacli-ga&-pool heater—
$6,76 ---
Each gas-wall-farnaec -unit--
$4,7-5---
Gaspermilj6r-new-reNidential -eorairiff-tion. -
$0,0675..per-softife-jboi.ofelmiltiliT
HALEG-DIRTisa12010 OrdinancelFee Table -legislative version8.16.2010.doc
15
TABLE INSET:
Me anicat Permit Fees
;1. echanical. Permits ees :' or° Sti nd .Alone Permits NOT Associated witli a Buiidin4 Pl'.rrnit
Residential
4524 o... Valuation
Gek
:x
S() lco 5 Million
-re.sidcnlial
A iniJnwn.li'e%=
$10.001.._to,._$2() Million
.6O% of Valuation
4)-(k
$S.0...()Q
TABLE INSET:
Me anicat Permit Fees
;1. echanical. Permits ees :' or° Sti nd .Alone Permits NOT Associated witli a Buiidin4 Pl'.rrnit
Residential
4524 o... Valuation
Commercial
S() lco 5 Million
.i()% of Valuation.
$5.001 to $14) Millionl
,65% of Valu tion
$10.001.._to,._$2() Million
.6O% of Valuation
$20.0()1 to $y() Million
.58% of Valuation
..,..,.rt`R.,k CCA -YA'i:. FEES
..
:1 stz Elation 4 t- lit)w- `>;-i icing- lea iilg. 't:t7ti rtin ,,.9..,t.. ,..t _..air -co idition
aid....ef=riger #:ic x}-sys£ ii s--...
.$'.:3:( ).,.,,i::..$' :-0. per
$.1 -1(i--i.t-valtxat tf-._....
`
e • � 43.c.�„
i r'igera'tie -sy t i:s......
�. .. ..
`61-;-000--n- luatio ---
33,0()0 B`I'l.i (1 :RI3).>-334 tali BSI:[')
,
,00t {.i()
>w 3.0.000_l 'l:l ....{-1.t3-BlE. *- -
$9045----
.
f ot-C"{3ni lin-any-. i£ztAng..!e tilati ni is tet,...E:fdt"-.Gonditi(3i'71Yfs4x- n,
refilr;#(lpalion-:ysiCsin5,,a e' -eve; ?: de it -----
imiL- f 4mil-dii -area-
inrt,for accessory residential iii <:, :..-
ix3 -.f - lE i ,x -,✓wee -
Temporary operation inspection
$ ti.00 S80.00
H:1LEG-D1R1Lisa12010 Ordinance\Fee Table -legislative version8.16.2010.doc
16
,fee
.ffrpriiitAes---
Minimum fee
$75.00 $80.00
Commercial
Plumbing Code Fees
Plumbh ;: PermztsF"e s or Stand '1/one Per ' iis V ' 'Ass do et tili a Bui dino Permit
Residential
0.52% of jaluation
Commercial
$0 to $5 Million
.70% of Valuation
$5.001. to $10 :Million
.65% of \initiation
$10.001 to $20 Million
„60% of Valuation
20.001 to $50 Million
.58%of Valuation
--44,44-M-RING-GOD-1—
AMOUNT OF
-FEE
---14tinabiiag. perinit-fe.e-teept-for-ne-w-residential
censtatotierE---
Fiaa-water.-Elistri4tition.--new.-(ifiside)---
,
$6.75
new (out„..;ide)
Eac-li-water-se-Mee--repla-ee-(etitside). --.
$6,75-
• -,: - .•. -
b6.75
•
P '. 7?"'
$6.75
Lacisi-lavatofy---.
.,
Eash-sifik—
$6,7-5
Eaell-slop-sink—
$6,7-5---
6.75
Eaell-titina1—
.$6,75--
H:ILEG-DIR\Lisa12010 OrdinaneeTee Table -legislative version8.16.2010.doc
17
Each-water-eleset.---
$6775
Each boiler
$6,75
gte, °
$6.75
Each..-ee . ',#lig-t{?:yf::er-.,..,..,
-.--
$20,-2.5---
i_ ae }..4is1lwa Chef-......
7-...-,...
$6,7-5--....
t -linking fo
unI din
:,acj,1,
;[-6(
jc
Eac
'J?--
$6,7-5
1 e€ trig- et-wiitei'.- eatf' --...
$6..75,._..
Gas hoot heater
$6.75
water.
@a4il1- oo -heath'- --
$.6,7 -5 ---
Each
$6.75
pump
-wh
$6:7.5----
w'ashl`'� , ti 3ii3E
i ll-' m'at't- €:"E ii.. .--i3ilking-mae liiiti
`'s.(}:75........
.tuner
$6.75
_;a 11 3i=inkli.r..,ilnd--.}i'ligatio-R-s stern!,s,- er.-..4�000..-
uare
.73
,r
.4ch catch. basin
.75
$31.73
H:1LEG-D1121Lisa12010 Ordinance\Fee Table -legislative version8.16.2010.doc
18
l aeli-grease-intefeept ti•.......
$3-1,7-3—
$3-1-.-7-3 -..Each.
Classification
Eachhut~ drain.
75
House mover
None
$133.00
Each lin station—
7
$135.00
Master electrician -sign
$75.00
$135.00
1 h 4
''::.,
-Fe -drain
t' u{. i- i -an ..t a 3..........
$34 3 Z...,...-.
IF:irst tunnel---
$':-9.44
1- a . additiem tunnel ..,.....
$4.&20-....--
s'.e- -F si 4: e t:i i ....e. }iT4 i etie i.,--.,..
• Iurnhin y, permli; -l.£.f io1Xr:_yesiddontFa no i};ii:ictioi:}.,..,..,..
S
f
sktua
43E3t E
Plumbing.-eisi}Z1{..:fer..aecessnl-..re'siC ential—e 3n stFuction....
.
.-
Minimum Fee
$75.00 $80.00
.Backflow Prevention
Backflow prevention device test filing fee
$4-5-.44—$20 00
Minimum fee
$75.00 $80.00
TABLE INSET:
LICENSE
FEES
Classification
Examination Fee
License Fee
House mover
None
$133.00
Master electrician
$75.00
$135.00
Master electrician -sign
$75.00
$135.00
H:1LEG-DIR\Lisa12010 OrdinancelFee Table-Iegisiative version8.16.2010.doc
19
Master electrician -elevator
$75.00
$135.00
Journeyman electrician
$75.00
$30.00
Maintenance electrician
$35.00
$30.00
Limited journeyman electrician
$75.00
$30.00
Apprentice
None
$25.00
Certified electrical maintenance person
$30.00
None
TABLE INSET:
CONTRACTOR REGISTRATION FEES
AMOUNT
Mechanical contractor
$135.00
Plumber
$135.00
Lawn irrigator
$135.00
Backflow prevention assembly tester
$135.00
SECTION 2. If for any reason any section, paragraph, subdivision, clause, phrase,
word or provision of this ordinance shall be held invalid or unconstitutional by final
judgment of a court of competent jurisdiction, it shall not affect any other section,
paragraph, subdivision, clause, phrase, word, or provision of this ordinance, for it is the
definite intent of this City Council that every section, paragraph, subdivision, clause,
phrase, word or provision of this ordinance be given full force and effect for its purpose.
SECTION 3. Publication shall be made in the official publication of the City of Corpus
Christi as required by the City Charter of the City of Corpus Christi.
SECTION 4. That all ordinances or parts of ordinances in conflict with this ordinance
are repealed.
SECTION 5. This Ordinance takes effect October 1, 2010.
H:1LEG-DIR\Lisa1201D OrdinancelFee Table -legislative version8.16.2010.doc
That the foregoing ordinance was read for the first time and passed to its second
reading on this the 0,1:66- day of , 2010, by the following vote:
Joe Adame
Chris N. Adler
Brent Chesney
Larry Elizondo, Sr.
Kevin Kieschnick
Priscilla G. Leal
John E. Marez
Nelda Martinez Ascev/-
Mark Scott
That the foregoing ordin nce was read for the second time and passed finally on this
the 31- day of „Gat" , 2010, by the following vote:
Joe Adame
Chris N. Adler
Brent Chesney
Larry Elizondo, Sr.
Kevin Kieschnick
PASSED AND APPROVED this the
egday of , 2010.
ATTEST:
Priscilla G. Leal
John E. Marez
Nelda Martinez
Mark Scott
Armando Chapa
City Secretary
APPROVED as to form:
By:
Lisa Aguilar, Assistant City Attorney
for the City Attorney
Joe A. me
Mayor
0287,6
EFFECTIVE DATE
fotivicrA.1),,,101D
State of Texas
County of Nueces
}
}
PUBLISHER'S AFFIDAVIT
CITY OF CORPUS CHRISTI
Ad # 5949508
PO #
Before me, the undersigned, a Notary Public, this day personally came
GEORGIA LAWSON, who being first duly sworn, according to law, says that she
is LEGAL SALES REPRESENTITIVE AND EMPLOYEE OF THE PUBLISHER,
namely, the Corpus Christi Caller -Times, a daily newspaper published at
Corpus Christi in said City and State, generally circulated in Aransas, Bee,
Brooks, Duval, Jim Hogg, Jim Wells, Karnes, Kenedy, Kleberg, Live Oak,
Nueces, Refugio, San Patricio, Victoria and Webb Counties, and that the
publication of, NOTICE OF PASSAGE OF ORDINANCE NO. 02875 which the
annexed is a true copy, was inserted in the Corpus Christi Caller -Times on the
9/6/2010, 9/6./2010.
$ 242.25
1Time(s)
On this day of
is a true and an exact cosy made by publis1 er.
LEGAL SALES EPRESENTIVE
t-201° I certify that the attached document
GWENN J. MEDINA
MY COMMISSION EXPIRES
August2,2012
Not Lry Public, State of Texas
:113 G -t.7 fi CL 5-5ti95Og
September:6.2010,» CALLER -TIMES
`NO110E OF
PASSAGE;OF
ORDINANCE
:1,19421.375.4,:,",
Amending Cfr "1
Deve[oprnent Ser
vices," Art,Xil:f_
pevelopmeti Ser+-
vices',Pees, f iy 1
"Technical Gonstruc.;y
tlon Code 0ess'
Seat :1,4iSt72 "Star) <
psi/ar�iizej dpBuiIdrng`
1 Ya :t1oti, ipso i
14 1lb4 Processrn ti.
And, Pian Revleti
Fee"; Sect 14=130ff
"Speclal Fees ;.Sect"
i4 '
13p7, "Aeduoe
Fees , Sect 1413121,
Accounting', &'SSec
141313 Technice�
Cbnstruot;ohl Cod
Fes S,chedulce" o;
the Code of.Ord
City of<Qor}1us'Chrls
ti, to provide top
minimum perrriit fees
simplified methods te;
calculate Suiidrrt•!
Permit Fede,'&.: ple,
Review Fees, to 15ro
vide .for expedfle.s
Plan eview by'irite
nal 8t ff, to prod...
for. customized:Pia `E
Revlew to ,provrd'w
disaoirt►t$ of 'l=ees- t�E
Permit. Molders :.mao
+nr4t?5cert.ai
regt�rr mems, to pro'i'
vide ,_for Speci.a.t
inspections an 0-00r
standard Iays;.ar,
j�ogrsk t¢ provide fo
ert
C0(60es Af corn:
ppihtI' tt to. Sh'el
Buildings' tc provlds
for Fetes for Con
struction Site Offices
Foee`fgr both stars
lord duplicat
Certificates -of Accu
'Ran cy Faes•fa.'
TerrrPOI: ar�r Event,s'
Penalty Fess; In'=
spectiohs Outelde of
the Cityy t.imlts;>Eiec:
trlcarpe:imit Fees',
Piumi +rtg Perni.R
Fees, .,Machan co -i
Permit:Fees, :Fuel
Gas. Per.rfiit,,fees'
SwlmY muig ;,Pad'I.
Fees, &:` providing for
Fees fo.r existing ap-
plications made;prlor.
to pthe effeotive date;
Xoviding a repealer
p clause;: andprovidingg
an effective date o'#
Octoberl, 2010. :
/slArrnandq Chap
e rete