HomeMy WebLinkAboutMinutes Island Strategic Action Committee - 03/06/2012Island Strategic Action Committee
Meeting Minutes
March 6, 2012
1. Call to order
➢ Chair called the regular meeting of the Island Strategic Action Committee to order at 5:35 pm
on March 6, 2012
2. Roll call
Chair conducted a roll call.
Committee members present
John A. White Sr.
Gabriel Hilpold
Charles Mader
Bryan Gulley
Ronald A. Voss
Paul Schexnailder
Gregory Smith
Jyoti Rakesh Patel
Colleen McIntyre
John Trice
James Needham
Alex Harris
Committee members not present
Ronald Voss
J.J. Hart
Colleen McIntyre
Jay Gardner, Watershore & Beach Advisory (Ex- Officio)
Keith Arnold, C Convention & Visitors Bureau (Ex- Officio)
Staff members present
Bill Green, Interim Assistant Director of Engineering
Derek Herzog, Gulf Beach Manager
Natasha Fudge, Engineering Services
Mark Dekoch, City Attorney
Martha Quiroz, Engineering Services
3. Approval of Minutes for February, 2012
February 7 2012 minutes approved motion by Gregory Smith second by Charles Mader.
4. Public Comment
NONE
Presentation and Discussions
Gabriel Hilpold: Engineering Project Status Report from Natasha Fudge.
1of4
Natasha Fudge: Engineering Project Status Report:
• Billings and Clems Boat Rama Improvements: (TPWD, SEA, TGLO and City funded)
o Held stakeholder meeting on February 27. Construction schedule and bidding schedule
discussed. Additional coordination with TxDOT will be required. Currently anticipate
advertising project for bidding in May 2012 and start of construction in September /October
2012 to accommodate facility users and busy summer months. Working with consultant to
provide a project design within available funds, considering both an asphalt and concrete
pavement section.
• Packery Channel Dredging and Beach Re- Nourishment:
o TxDOT completed repairs to SH361bridge. Dredging Contractor is demobilizing. Dredge pipe
has been removed from the beach. Contractor in process of surveying channel area to
determine final project quantities and acceptance of work as completed. Channel depth at
mouth of channel being assessed for project acceptance. Approximately 215,000 cubic yards
of material has been dredged, pending confirmation via surveys.
PR 22 Bridge:
• Ongoing coordination with consultant regarding submittal of Design Summary Report.
Awaiting revised submittal from consultant prior to scheduling a meeting with TXDOT.
Anticipate receipt of draft report to City by 03/09/12.
• Ongoing coordination with consultant regarding submittal of draft categorical exclusion
environmental document. Awaiting submittal from consultant, anticipated by 03/09/12.
Consultant provided traffic data request to TxDOT and anticipate receipt of information in
April.
Aauarius Street Dasmarinas to Commodores IBond'081
o Progress to date includes
1. Installed 16" and 8" water line on proposed Aquarius St.
2. Installed storm inlets on proposed Aquarius St.
3. Installing 30" RCP on proposed Aquarius St.
4. Cut sand subgrade to grade on proposed Aquarius St.
o Work underway during this reporting period
1. Installed 16" and 8" water line on proposed Aquarius St.
2. Install storm inlets on proposed Aquarius St.
3. Installing 30" RCP on Aquarius St.
4. Installing 8" force main
5. Installing curb and gutter on Commodores Blvd.
0 4 Week Look Ahead (Key Project Milestones)
• Milestone
• Complete RCP installation.
• Complete water and force main tie ins
• Complete storm structures
• Grade subgrade on proposed Aquarius St.
• Place geo grid and base on proposed Aquarius St
• Prepare paving grades.
Due Date Status
March 2012
Scheduled
March 2012
scheduled
March 2012
scheduled
March 2012
Scheduled
March 2012
scheduled
March 2012
Scheduled
2 of 4
• HK Infrastructure Study:
o Awaiting report submittal from consultant.
Alternative Water Supply to the Island
• Permitting assessment underway. Surveying and field alignment completed in January 2012.
Consultant developed alignment cross - sections for TxDOT permit review in February 2012.
Consultant to schedule 2nd permit coordination meeting with TxDOT CC Area Office in March
2012
• TxDOT will require State approval for longitudinal occupancy of JFK Causeway (PR 22) state
ROW. Failure to secure PR 22 ROW will greatly increase the construction cost of the project
and delay ability to provide redundant water supply to Padre Island. Additional cross - section
and centerline profile information to be prepared for follow up permit meeting.
• Packery Channel Phase 2 and 4 — Overlooks and Parkine Lot:
o No update
• Packery Channel Phase 3 — Restroom Facilities:
o No update
• Maintenance to Packery Channel aids to navigation
o Complete
• Gypsy Bridge Assessment
o No change from last report
• Padre Island Sector 4 Waste Water lift Station Improvement
o Project bidding phase underway, bid opening date to be scheduled.
Gabriele Hilpold: No comments or questions for Engineering project updates. Moving on to Parks & Rec
updates.
Derek Herzog: Spring Breaks start in 3 days; Whitecap, Seawall, and Access Road 3 and Access Road 2
going to North of Port Aransas city limits are ready. Zahn Road will require more work need to add the
lanes. About 300 trashcans will be all over the beach. Police department and code enforcement will be
out there writing tickets. No dogs allowed along the beach of Access Road 3 and the main spring break
area. No pallets allowed at the beach.
Committee: Suggested to write a letter of thank you to the Coastal Bend Bays &Estuaries program for
funding the dumpsters.
Derek Herzog: Beach to Bay will be May 19`" and will start from Briscoe run North Parallel to the beach
of the Access Road, on the beach to the front of the Seawall and turn around to Access Road 6.
Gregory Smith: We have five street lights along the beach at Whitecap, what is the status on that?
Derek Herzog: I offered to pull them out but as long as the lines are energized AEP needs to do
something about it. I talked to AEP but it looks like they don't want to remove or fixing them, so need to
look for someone who is responsible for them and check if something can be done. Will work with traffic
engineering and see if we can come up with a plan.
Gabriele Hilpold: Zip code analysis through tracking parking Permits will be skipped to the next
meeting, when Scott Cross is present. Will go ahead and go with Charlie for the summary of Briscoe King.
3of4
Charlie: The Nueces County Board of commissioners has a project to improve Briscoe King Pavilion to
make it an all event center. Project is out for bids at this time will be advertisement today and next week.
One problem with this project is that it requires additional utilities, it requires we have a new line up to
Briscoe King. Have met with Oscar Martinez regarding this project, and we think we have a deal at this
time. The City of Corpus Christi has provided me with an inter -local agreement between Nueces County
and the City of Corpus Christi; once we get the agreement approve by the City attorneys we are going to
add it on the commissioners agenda for approval. Will have a new updates around Mid -June to the end
of June before the project is complete.
John White: We will have a regular update on our agenda for the Briscoe King project.
Gabriele Hilpold: Possible increase for windstorm insurance, possible up to 30 % increase. If that's true
we need to look at this more careful and what can be done. Please add Foster to be present at the next
meeting for the Windstorm Insurance. Next item will be duck hunting update.
Mark DeKoch: A meeting was held back in February 10'' between the City Attorney, CCPD and the TX
Park & Wildlife. City Ordinance allows hunting within the City but it has to be 1000 ft from a building,
however there is a Local Government Code that reads: Municipality may not apply regulation then it
stops and continues if you annex a land prior to September I of 1991 you can regulate. If the City cannot
do a regulation because of the Local Government Code, then you will not be able to enforce it that is why
the date of annexation is so important.
Gabriele Hiloold: We are looking at this for next year's duck hunting and that people would be aware,
we want to have a solution for this problem and how it can be enforce for those who break the law.
Alex Harris: They just released preliminary FEMA maps, and would like to get copies of them for next
meeting.
S. Committee Reports
No Reports
6. Schedule Next Meetine
April 3 rd at 5:30pm Padre Island Country Club
7. Adioumment
➢ Motion to adjourn the meeting by James Needham, second by John White
4 of 4