HomeMy WebLinkAboutC2005-062 - 2/22/2005 - ApprovedCHANGE ORDER NO:
OperaUng Deflarlment:
Name of Project: Comus Christi Baseball Stadium - Whataburoer Field
Contractor: Fulto~ -CoastCol'VHunt JV
CHANGE
1. Owner PCO's ~fl,2,3,4,
*Note: Please ref. attached Page 2 of 2 For PCO de~alls.
Tol~l Add- Lump Sum
CHANGE ORDER
Department of Engineering Services
City of Corpus Chris., Texas
PROJECT NO: 4285 CONTRACT TIME: Coml;)tete 4-5-05
Enaineedm3 Serv~es DATE: Februar~ 16, 2005
~M:)D DEDUCT
$393,150
$393.150
Why was this change necessary? (Ii' left oil the plans and speci~aUons, explain why)
Many of the user or vendor reauirements were not avallabfa and had to be Incomomtad as the Drefact Droqreseed.
How can similar changes be avoided in the Mtum?
1. Due to the fast track nature of the Baseball ~'tadturn, the deslan conc~t was not fully developed until after
cons~ruc~on had beoun, Thus, this ~hanDe could not b~ maso~aJ:~v avoided.
A. CONTRACT PRICE .............................................................. $ 21.460.5P6.00
B. TOTAL CHANGE ORDERS (Inc. current) .......................... $ 1.085.928.00
C. NEW CONTRACT PRICE .................................................... $ 22.546.454.00
D. THIS CHANGE ORDER ....................................................... $ 393350,00
E. PERCENT TOTAL CHANGE (B/A) ...................................... 5-0~%
F. PREVIOUS ADDN'L TIME AUTHORIZED ........................... n/~ c d
G. ADDNI. CONTRACT TIME THIS CHANGE ORDER ......... n/a c d
H. TOTAL ADDmONAL TIME ................................................ n/a c d
/
CITY* OF COR PUS//CH_RIS'n, TEXAS
CO ..RA~nCetc~n~ n t~/
02/22/05 ;5 ~
M2005-063
Fulton-Coastcon/Hunt JV Page 1 oF 2
CHANGE ORDER No, 3 - Whataburger Field
Department of Engineering Services
City of Corpus Christi, Texas
a.)
b.)
d.)
Owner PCO #1 - HKS Issued modifications which included additional fire extinguisher cabinets,
added bathroom accessories, additional CMU, stained concrete flooring, ballpark netting, hot water
piping to the suites, and power and lighting to outfield structures.
Add = $37,805.00
Owner PCO #2- Mud slab provided under pre-cast seating area.
Add = $38,847_00
Owner PCO ~3 - HKS issued modii=ications which included structural steel and cover for open grill
area, flag pole additions, picnic storage expansion, addition of backlit signage (electrical panels
and conduit), additional electrical and plumbing [or outdoor concession areas.
Add = $158,954.00
Owner PCO #4- HKS issued modifications which included Concrete walls, stairs, and ramp for
the swimming pool area. HKS also issued structural modifications to Picnic Storage room, added
roof flamed opening [or mechanical, hot/cold hydrant. The largest port. ion of this PCO were in HKS
issued MEP and AmhitecttJral changes to the Whataburger Concession. This PCO also includes
Addendum #1 and Addendum #2 which pdce additional MEP changes to Whataburger.
Add = $157,544.00
TOTAL $393,150.00
Page 2 ol~ 2