Loading...
HomeMy WebLinkAboutC2006-076 - 2/28/2006 - Approved 2006-076 02/28/06 M2006-067 S.J. Louis Construction S PEe I A L PRO V I S I S PEe I FIe A T ION S AND FOR M S o F CON T RAe T S AND BON 0 S FOR SOUTHS IDE WATER TRANSMISSION MAIN PHASE 5 RODD FIELD RD. TO WHITELEY DR. December, 2005 PREPARED FOR: Water Department City of Corpus Christi P. O. Box 9277 Corpus Christi, TX 78469-9277 (361) 857-1881 ..,......'''' '\." -- t: OF T. ~"" ,:F~'\t:.'\......... r.~4,,'J~ r ,. l ..A-,. \"" '1. it... JA1 ';*'" 1-...:.... .-....... ....... ..... ~..... ~ I.~~~~.~~.~~BQ~~Y..~ t-o \ 1201$ ~ .,tp~..~tflltl" . ~ ~~_~~Ic./.~ - I9n . '. IE....:../.... '<. ':j . URIIAII ENGINEERING P. O. Box 6355 CORPUS CHRISTI, TX 78466-6355 Phone No. 361/854-3101 FAX 361/854-6001 U.E. Job No. 33760.A2.05 FAX TRANSMISSION Department of Engineering Services Major Projects Division City of Corpus Christi P.O. Box 9277 Corpus Christi, Texas 78469-9277 Phone: 880-3527 Fax: 880-3501 To: i\LL PLAN HOLDERS Date: January 31, 2006 From: , /d Pages: Angel R. Escobar, P.E. ~ ~~ Director of Engineering ces 4 (including cover sheet) Subject: Southside Water Transmission Main Phase 5 Project No. 8391 Addendum No.4 Comments: This fax transmission contains the signed, sealed addendum from Urban Engineering, Inc. The addendum modifies the Technical Specifications and Drawings. Prospective bidders are hereby notified of the following modifications to the contract documents. These modifications shall become a part of the contract documents. All provisions of the contract documents not specifically affected by the Addenda shall remain unchanged. -- City of Corpus == ChrIsti ~~ ADDENDUM NO.4 TO: ALL PROSPECTIVE BIDDERS January 31 . 2006 SUBJECT: Souths ide Water Transmission Main Phase 5 Rodd Field Road to Whiteley Drive Project No. 8391 Prospective bidders are hereby notified of the following modifications to the contract documents. These modifications shall become a part of the contract documents. The provisions of the contract documents not specifically affected by the Addendum will remain unchanged. I. PART T - TECHNICAL SPECIFICATIONS A. SECTION 02518 STEEL PIPE AND FITTINGS FOR LARGE DIAMETER WATER LINES 1. See page 16, Item 2.04 EXTERNAL COATING SYSTEMS FOR BURIED STEEL PIPE, A.2 DELETE: ADD: 2. Cement-mortar Coating: AWWA C205; shop- applied, cement-mortar coating except as modified in this Section; 1-inch minimum thickness; cut back coating from joint ends no more than 2 inches to facilitate joining and welding of pipe. Cement shall be Type II maximum 5% tricalcium aluminate or use Tvpe V. 2. Cement-mortar Coating: AWWA C205; shop- applied, cement-mortar coating except as modified in this Section; 1-inch minimum thickness; cut back coating from joint ends no more than 2 inches to facilitate joining and welding of pipe. Cement shall be Type II maximum 5% tricalcium aluminate. Type V or ASTM C 150 Type 1/11 with a minimum of 6% and a maximum of 8% tricalcium aluminate. Mortar mix shall be 10.5 baas/yard with a water-cement ratio of less than 0.36. Provide one type of cement for the entire proiect. t-_llgll1eentlg ,~~crv!\-'L'S F i K1X' 'T" . (,rpu.. Cimsu, Texas 7li46l)-92T7 . lito!) 880-3500 ~ ~ -- - Addendum NO.4 Page 1 of 3 2. See page 17, Item 2.06 GROUT FOR JOINTS AND SPECIAL APPLICATIONS, A.1 DELETE ADD: 1 , Portland Cement: ASTM C 150, Type II with a maximum of 5% tricalcium aluminate or use Type V Provide one type of cement for entire project. 1. Portland Cement: ASTM C 150, Type II with a maximum of 5% tricalcium aluminate, Type V, or ASTM C 150 Tyee 111I with a minimum of 6% and a maximum of 8% tricalcium aluminate. Mortar mix shall be 10.5 baas/yard and the water-cement ratio shall not exceed 0.36. Provide one type of cement for entire project. B. SECTION 02613 BAR WRAPPED STEEL CYLINDER PIPE 1. See page 8, Item 2.01 BAR WRAPPED STEEL CYLINDER PIPE, G.1.b DELETE ADD: b. Coating: Provide Portland Cement ASTM C 150, Type II with maximum of 5% tricalcium aluminate or use Type V. b. Coating: Provide Portland Cement ASTM C 150, Type II with maximum of 5% tricalcium aluminate, Type V or ASTM C 150 Tyee 1/11 with a minimum of 6% and a maximum of 8% tricalcium aluminate. The mortar mix shall be 10.5 baas/yard and the water-cement ratio shall not exceed 0.36. Provide one tyee of cement for the entire eroiect. 2. See Page 12, Item 2.03 GROUT FOR JOINTS AND SPECIAL APPLICATION, A.3 DELETE: ADD: :3 Portland Cement: ASTM C 150, Type II with a maximum of 5% tricalcium aluminate or use Type V. Provide one type of cement for entire project. 3. Portland Cement: ASTM C 150, Type II with a maximum of 5% tricalcium aluminate, Type V..9!.. ASTM C 150 Type 111I with a minimum of 6% and a maximum of 8% tricalcium aluminate. Mortar mix shall be 10.5 baas/yard and the water cement ratio shall not exceed 0.36. Provide one type of cement for entire project. Addendum NO.4 Page 2 of 3 II. DRAWINGS A. SHEET 32 of41 ISOLATION AND BLOW-OFF VALVE DETAILS See Section 2-32-32 ADD: Note: Provide 16" blind flanae at base of 16x16x12" tee. Please acknowledge receipt of this Addendum at the appropriate place in your REVISED proposal form. END OF ADDENDUM NO.4 ~""""'" --- Eo OF T. -\\ .:- ~~...."....€.~.A '. ",. c".... * .~cP I, ,.. . .. 'j ,... ...11'1 ,*: ~. ,....:...1...........1...1.. :.... ~ I. J. DOUGLAS MCMULLAN ~ ~... ':... .....1...... ...... ': ....iI f.~... 91068 ... ~ , ~.. . , ff o~...!!CEN~~."~ . ~8.t ......... ~ 1 J. Douglas McMullan, P.E. Addendum No.4 Page 3 of 3 ~ City of IJIlW Corpu~ :=r = ChrIstl ADDENDUM NO. 3 ~......~ January 26 2006 ALL PROSPECTIVE BIDDERS TO: SUBJECT: Southside Water Transmission Main Phase 5 Project No, 8391 Prospective bidders are hereby notified of the following modifications to the contract documents. These modifications shall become a part of the contract documents. The provisions of the contract documents not specifically affected by the Addendum will remain unchanged. I. PART A - SPECIAL PROVISIONS A, A-4 METHOD OF AWARD DELETE: n 1. See Page 2 of 32, Item 1 ADD: n. Loading, hauling and unloading suitable excess material removed from the trench excavation to the City's property at the J. C. Elliot Landfill site (suitable excess material becomes the City's property. The Owner shall decide what is suitable excess material). Providino final oradino of stockpiled material to provide smooth orades and with maximum side slopes of 1 foot vertical to 4 foot horizontal. Unsuitable and unwanted material. as determined by the Owner, shall be removed per Special Provision A-16. DELETE: J 2. See Page 4 of 32. Item 8 ADD: Loading, hauling and unloading suitable excess material removed from the trench excavation to the City's property at the J. C. Elliot Landfill site (suitabie excess material becomes the City's property. The Owner shall decide what is suitable excess material). ProvidinQ final orad;no of stockpiled material to provide smooth ~rades and with maximum side slopes of 1 foot vertica to 4 foot horizontal. Unsuitable and unwanted material. as determined by the Owner, shall be removed per Special Provision A-16. j. Loading, hauling and unloading excess material removed from the trench excavation to an approved disposal site. The City landfill may ~t excess excavated material provided it is sutta Ie for their needs. For further information. Addendum NO.3 Page 1 of 4 Lngmeerlflg SerVice" f' n Hox '/277 · ('orpw. ( 'hristi, Tex.as 78469-9277 . 11(1) l'\80-3500 ~~ B A-37 AMENDED "ARRANGEMENT AND CHARGE FOR WATER FURNISHED BY THE CITY" See page 24 of 32 ADD New Paragraph: The cost of water for hydrostatic testing and disinfection of the completed water line and ana other water needed for construction will be pai for bv the Contractor. II. PART T - TECHNICAL SPECIFICATIONS A. SECTION 02040 GEOTECHNICAL INVESTIGATION 1. "Geotechnical Investigation Southside Main Transmission Line Phases 4, 4A and 5 City Project No. 8390, 8425 and 8391 Corpus Christi, Texas" See Appendix following Page 16 of 16. DELETE ADD: Current Appendix in its entirety. Revised Appendix as per Attachment No.1. 2. "Geotechnical Investigation Southside Main Transmission Line Phase 5 Reroute Corpus Christi, Texas" See Appendix following Page 13 of 13. DELETE ADD: Current Appendix in its entirety. Revised Appendix as per Attachment No.2. B. SECTION 02518 STEEL PIPE AND FITTINGS FOR LARGE DIAMETER WATER LINES See page 13, item 2.02, INTERNAL LINING SYSTEMS FOR STEEL PIPE, ALL INSTALLATIONS, C (1) DELETE C (1) AWWA C205; except as specified herein: 2-inch minimum thickness for pipe diameters 42 inches and larger; 3/8-inch minimum thickness for pipe diameters 36 inches and smaller. Cut back lining from I'oint ends no more than 2 inches to facilitate joining and we ding of pipe. AWWA C205; except as specified herein: 1/2-inch minimum thickness for pipe diameters 42 inches and larger; 3/8-inch minimum thickness for pipe diameters 36 inches and smaller. Cut back lining from joint ends no more than 2 inches to facilitate joining and welding of pipe. ADD C (1) Addendum NO.3 Page 2 of 4 C SECTION 02613 BAR WRAPPED STEEL CYLINDER PIPE See page 10, Item 201 BAR WRAPPED STEEL CYLINDER PIPE, I. 2. DELE Tf: ADD: 2. 2 Rubber-Gasketed Joints: Double weld bell and spioot rino onto steel cylinder. In thrust areas, double weld bell and spigot ontQ~steel cylinder o SECTION 15101 BUTTERFLY VALVES: See page 3 Item 3.02 BELOW GROUND INSTALLATION DELETE ADD: 3.02 The butterfly valves shall have mechanical joint ends and shall have a geared actuator suitable for buried service with necessary stem seals and gaskets to prevent entry of water into the housing. Valves shall be equipped with a valve box and stem extension. The stem extension shall have a 2" operating nut extended to within 6" of finished grade. Exterior of valves and accessories shall be coated by the manufacturer with a material suitable for underground service to protect against corrosion 3.02 The butterfly valves shall have flanged joint ends and shall have a geared actuator suitable for buried service with necessary stem seals and gaskets to prevent entry of water into the housing. Valves shall be equipped with a valve box and stem extension. The stem extension shall have a 2" operating nut extended to within 6" of finished grade. Exterior of valves and accessories shall be coated by the manufacturer with a material suitable for underground service to protect against corrosion. E. SECTION 15104 GATE VALVES: See page 1 and 2, Item 202 VALVES 4 INCHES THROUGH 16 INCHES 1. DELETE: VALVES 4 INCHES THROUGH 16 INCHES. 2. ADD: VALVES 4 INCHES THROUGH 24 INCHES. ADD: New Item: G. Valves 16" and larger shall be furnished for horizontal installation and shall be equipped with bevel gears. III. DRAWINGS: A. SHEET 18 OF 41. WATER MAIN PLAN AND PROFilE, BASE LINE STATION 167+50 THROUGH 179+50 1. DELETE: Between Station 1 78+55 to Station 179+80 50' TEMPORARY CONSTRUCTION EASEMENT ADD: NO TEMPORARY CONSTRUCTION EASEMENT Addendum NO.3 Page 3 of 4 2. ADD: New Note: Grade and shape existina around adiacent to north edae of pond to match existina contours. 3 Clarificatlun The existing 10' TeE between Station 178+55 and Station 179+80 is not affected by the above deletion and remains in effect. B SHEET 34 OF 41, AIR RELEASE VALVES AND DETAILS 1 See Detail F -34-34 DELETE ADD' See Piping Schematic Detail E See Piping Schematic Detail !! 2, See Detail D-34-34 ADD: New Note: See Pipina Schematic Detail B IV. CLARIFICATIONS The Contractor has two goals to meet, an individual Phase goal and the overall contract goal. If Contractor elects to work in two (2) phases concurrently, he will be assessed one (1) day in each phase and one day in the overall contract time, For example, if he starts Phase II and'" at the same time, at the end of 60 Calendar Days, he will have 15 days left in Phase II and Phase III will be complete. The total time remaining in the contract will be 240 Calendar Days. Please acknowledge receipt of this Addendum at the appropriate place in your REVISED PROPOSAL FORM. END OF ADDENDUM NO.3 ""-""', .:-~~.9E.[f~~\, ~ e:,'\..... '* ...~d' " , 1ft ..' '. * 'j , . ~ , ~*i ~*"I ,... ....................... ......"1. '- J. DOUGLAS MCMULLAN "'I ~...........................~...." J. Douglas McMullan, P. E. t. ~" 91 068 ..~1 'tt~...~!CEN~~.""~f\ f\ ~ /~, ~8fi"""'" ~ ~ \ \ // d ,~,- \ \ I r, - "C- \ I ,2.(P\ ~ , ATTACHMENTS: Attachment 1: Geotech Report Appendix for Phases 4, 4A and 5 Attachment 2: Geotech Report Appendix for Phase 5 Addendum NO.3 Page 4 of 4 ?6927/CCH4R001 Jpyright 20()4 Klel:1felder k~ KLEINFELDEI~ APPENDIX Addendum No.3 Attachment No. 1 Page 1 of 44 Jarluary 7, 2004 k~ KlEINFElDER Site Vicinity Map. Southside Main Transmission Line Phases 4, 4a, & 5 Corpus Christi, Texas PLATE 1 Addendum NO.3 Attachment No. 1 Page 2 of 44 J I J , ,"\\"'f ~~ . """,it ~ ..... . ..,. Xf:' '!';f: : _ '; 'j t'::; .~,': '; ;.~'" _,' l\. ~ .. "" ',:~i."', ~ " t, )~i~~~...~ tLr~n &-11;' ' ;;,il .. .~,::.::::::~::_,.~ A .::~,~'_:: , ';;"11 . ct" 1 f ii "t"~ii :;-.:.:; ., ,'f "I , " \\ .~~ \. .. . . . . . ~,~ . .; ~; c. ~ \.-" '''''''II..... B N "I::' .. """ ~ s i~r0st(jN c<.~ 9" t~OSSING ~;, Addendurr Nc- -"I Attachrner I Nc Page 3 of 44 SOUTHSIDE TRANSMISSION Mf t PHASES 4 AND 4A Boring Location Plan Southside Main Transmission Line Phases 4, 4a & 5 Corpus Chnsti, Texas PLATE 2A ~ f : i i! -. '1 ,;T,,';;;< . -' ",_JI;,,-'" "- k~ KlfINFf:lDEI< Southside Transmission Main - Phases 4, 4a, and 5 Corpus Christi, Texas Summary of Laboratory Tests Results Boring Sample Me -200.0 LL PI UDW Qu No. Depth (ft) 0' % G/o % (pet) (tst) Other /0 9-1 4-6 :'9 66 50 93 1.4 6-ts Sulfide=90 Chloride= 1 030 ,.9 Sulfate 3350 (Units mg/kg) 10-12 ,.8 95 1.0 '3-15 ;;3 54 39 104 f3-2 2-4 :14 85 0.9 4-6 34 60 38 pH=809 SBR=144 ohms-em B-10 31 65 47 94 1.0 8-3 4-6 ~H) 46 30 98 0.7 13-15 2 97 0.6 0-2 Sulfide= 120 Chorlide=910 E:;-4 2 j 52 37 Sulfate=503 (Units mg/kg) 2-4 2 100 4.0 6-8 2 96 pH=828 SBR=230 ohms-em 10-1.) 2ii 67 44 96 1.6 R r: 3-4 :J 2;; 42 24 . . :J 7 5-S! 3 45 2.3 105-12 3 :.~ .,., , 1 S 5-20 2h 80 53 )3-25 2 101 29 53-35 2( 33 20 111 0.7 435-45 2: 14 2-4 Sulfide= 11 0 Chloride= 1640 ~~ 7 2:, 52 36 100 Sulfate 909 (Units mg/kg) 4-6 26 93 1.6 S-10 25 53 37 102 1.1 B-8 2-4 26 93 2.0 6-8 38 46 26 88 0-12 36 85 0.6 B-9 0-2 20 103 2.4 4-6 28 58 37 90 1(J12 56 39 pH=B 44 SBR=220 ohms-cm [3 10 5-3 30 14 4.5 Sulfide=240 Chloride=1290 32 Sulfate=713 (Units mg/kg) 4 5-6 29 54 33 13 15 21 114 1.2 811 4-6 19 39 25 103 1.3 1 0-12 23 58 8.12 24 19 pH=928 SBR=556 ohms-em 1-6 19 41 25 109 2.0 Addendum No.3 Attachment No. 1 Me moisture content; (- )200 percent passing #200 sieve; LL liquid limit; PI plasticity Index; Page 5 of 44 UOVV unit dry weight; Qu ullconfined compressive strength; SBR. soil box reSistivity Page 1 ot 3 PLATE 3 ..~ KLEINFflDER Southside Transmission Main - Phases 4, 4a, and 5 Corpus Christi, Texas Summary of Laboratory Tests Results Boring Sample Me -200.0 LL PI UDW Qu No. Depth (ft) c t % % 0/0 (pef) (tsf) Other /0 -.-------. 8-12 8-10 :4 42 8-13 4-b 6 Sulfide=160 Chloride=770 Sulfate=760 (Units mg/kg) 8-1 0 q 37 24 112 1.4 P14 2 A :0 69 44 107 7.9 -~ 6-8 29 98 1.9 8-15 4-6 14 113 6-8 2) pH=859 SBR=268 ohms-em R 16 0-2 33 18 113 1.8 Sulf!de= 180 Chloride= 150 Sulfate=77 (Units mg/kg) 6-8 1 J 112 1.0 , 0-12 2) 37 f3 17 2-4 h 113 4.5 4-6 1.1 32 19 110 17 6-8 1'i pH=912 SBR=239 ohms-em 2-13 5 2" t) Ij 18 2-4 2, 42 ')7 102 ,-6 2 105 1.4 ti-8 Sulfide=260 Chlonde=160 2 Sulfate=627 (Units mg/kg) -3..10 E' 35 22 111 1.3 F3-19 2-4 1 t pH=829 SBR=1340 ohms-em 4-6 1 ( 108 07 f)-8 1r 31 17 111 1.3 , 0-12 2C 105 F3-20 5-3 22 58 4.5-6 23 44 S! 105 22 35 20 821 4 5-6 36 59 31 10 5-12 Sulfide=230 Chloride=6700 35 Sulfate= 1270 (Units mg/kg) 13 5-15 28 l:? 18 5-20 21 pH=878 SBR=86 ohms-em 213-30 37 63 40 86 1.1 38-40 27 99 1.6 8 -,- S? 20 110 1.0 ' -L.!. ()-1 1 19 35 24 114 13-15 20 107 0.4 23 5-25 22 30 33 5-35 37 18 58 823 ;7-4 19 107 Addendum No. 3 Attachment No. 1 Page 6 of 44 Me moisture content; ()200 percent passing #200 sieve; LL liquid limit; PI plasticity index; UDW unit dry '-'''eight; Ou unconfined compressive strflngth; SBR soil box resistivity Page 2 of :3 PLATE 3 ..~ KLEINFELDER Southside Transmission Main - Phases 4, 4a, and 5 Corpus Christi, Texas Summary of Laboratory Tests Results Boring Sample Me -200.0 LL PI UDW Qu No. Depth (ft) % 0/0 0/0 % (pet) ( tst) Other 8-23 4-5.5 '8 pH=813 SBR=1916 ohms em 6-7 5 '2 5 9-1 0 t 3 25 12 B-24 3-4 5 ,2 6 4.5-6 Sulfide=210 Chloride~ 11 /0 Sulfate= 1 0 (Units mg/kg) 9-10.5 ; 3 2 [:3-25 4.56 ~ 0 4 B-25 13.51 ~ ,] l 8-26 1.5-] ~6 4 /.5-9 ~q 19 5 15-1 t pH=863 SBR=3544 ohms-em B-27 3-4 5 22 b 6-7 5 19 16 !328 53 1 ) c, 7 5-q Sulfide=270 Chlonde= 16 21 Sulfate= 12 (Units mg/kg) J10 5 21 1 f329 4 5-h 2 4 :3 5-15 1 fi 8-30 0-1 5 2!i 8 1 5-] 2~ pH=933 SBR=480 ohms-em 'J-7.5 2~ SJ 3 5-15 3 32 18 Me moisture content; (-)200 percent passing #200 sieve; LL liquid limit; Plplasticily Index; UDW unit dry weight; Qu unconfine'l compressive strength; SBR soil box reSistivity Page 3 oj :l Addendum NO.3 Attachment No. 1 Page 7 of 44 PLATE 3 - //#11-- 1/#/;--- I-- p--i --~ O.25H -+ I I I ! O.75H where: P = Apparent Earth Pressure, psf 75 H H = Height of Excavation, ft. Apparent Earth Pressure - Clays Southside Main Transmission Line Phases 4, 4a, & 5 Corpus Christi, Texas PLATE 4 k"lKlEINFElDER /11=7/1 Addendum NO.3 Attachment No. 1 Page 8 of 44 ~T-- //I=1/r- k.~ I<LEINFElDER -t IIF/II ~p~1 H where: P = Apparent Earth Pressure, psf = 40 H H = HeIght of Excavation, ft. Apparent Earth Pressure - Sands Southside Main Transmission Line Phases 4, 4a, & 5 Corpus Christi, Texas PLATE 5 Addendum NO.3 Attachment No. 1 Page 9 of 44 !),'pth )/ r~; t)~)J r:eet " 10 k~ KLEINFfLDER EXPLANATION OF SYMBOLS AND TERMS USED ON LOGS OF BORING SalT'; 'Ie I ':)1) ~,j (bonl ' _ 1 ~Ist, I ~ U"dtsfur'),;'(j ,'\hi tube sample Me .200 % \1." DESCF'IPTI()~,. UDW (pst) Qu (tsf) ~/a LL PI -, p eket Pentrur1wk' Jest 35 disfurbcn samplf~ Split Spoon sample and Standard Penetration' est Blow Count 'f' water surface .. see symbols herO'"v TYPICAL SOIL SYMBOLS - LJ - [~~J [Z2] l,'ar Clay (C L i L_.J LD CJ :,~'~i~ ~-'!.. .-~~ Well-Graded Gravel (GW) Poorly-Graded Sand (SP) Fit lay (Cf-<) Well-Graded Sand (SW) Soil 1M!.) Poorly-Graded Gravel (GP) Elastic Silt (MH Sdty-oand (SM) ~ c, ~>-. :.>' .> < /" '.;~ '''-,- -. '. [[J Silty Gravel (GM) Clayey Gravel (GC) ClilY"Y Sand (St. (,Icareous SOIL STRUCTURE N Blows per foot Slickensided F";slJrf~d L,; nrnated Inferh,ldded Relative Density of Cohesionless Soils Containing calcium, arbonate Relative Density 1 he presence of plares at weaKness hewing a slick and glossy appe;lranu Very loose 0-4 4 - 10 loose Breaks along defrnite planes of fractun, With little reSistance "Jlth fracturing Medium Dense 1 0 - 30 J"I.lternating thin I"yer', or lense~ of varying matenal 'lr c! >!or Dense 30 - 50 Very Dense Over 50 ,c. !ternatinq layer~ otarymg matenal Relative Consistency of Cohesive Soils Descriptive Term Uncon, Compr. Test (tsf) Very Soft Soft Less than 025 0.25 - 050 0,50 - 100 1,00 - 2 00 2.00 - 400 Medium Stiff Stiff Addendum NO.3 Attachment No. 1 Page 10 of 44 'J,~ry Slift Hard More than 4.00 rr/(" of Bonng 1.':0 3 u-'presentaton or N-',:. sub' :Jrface ,.1J3fe'/,j!s ,jt PIt, ;oeClfic bonng locatIOn within the depth explored. The transition between slrata may be (]faUIl,_)1 J(}d vanatio;; matel/ai YPt_~S c'Y'e dephs bet~Yeen)ur'n:;~' he expected J,;\.'at:!r icvel observations represent those conditions at the lime of '_'x; anCi rna\ a Nit/; IIml --3."(: the -- Projcd' LOC3t ion: Lat , ,ong: r.-- !'~ De Ih " , P" ." s.Ymb 01 .' "3mple ,PCI " : ;..:~.-~ '. t 4.,,' or ~ ..... '" ... , ,,4 ,. -- [:f_:;?:~<~ ~ III 2(; ).()(; OF BORIN(; SC1utt-,SI,Je iVatcr r c1nsrniSsion Main t:-'hases 4.4A, & 5 C, Jrpus Ch stl NUI',:es ,i Junty, Texas h,J/.'; N (bpT! pp Isf) MATERIAL DESCRIPTION B(1St~ ~1./11ter (:rushed L :mestone) - - Dark f,r LAY Wll'l !rOl: oXide stains CI dill/", ! tan dnd gray Wlttl qYOSLJ jepc';rt! drid Ii lite cI)/stals .\/I!f-~(-l ~,]ff ) j, l~odLJlf:~:~ coi,); ChHlg<:,! :an al1(j redrjlsh tali <H --...,- '------.-. - ;;1' ,}EPTfi !5 ') Feet , ,e<ght iDC ",!j,. ~----..i...-.__.__._. '_' -50nnq Wi.'S d't!!,?Ci ciry to the termination J9pth Gr JUri!\'/d!er was not cncountereif IUnr)~l dr: //:7g1')j samplinq ...~ KlElNHLDfR Boring Number Date: October 29,2003 B-1 Type: 3" Push Tube Me L! -200 o/~ _ 0/0 PI UDW Qu (pet) (Isf) LL 29 66 50 93 1.4 29 28 95 1.0 23 54 39 104 J Addendum NO.3 Attachment No. 1 Page 11 of 44 -- L()(; OF BORING Projt'('f Si)uthside Nater TranSI1lISsion Ma/n Phases 44A, & 5 Location: CXpJS err/sf;, NU2Cf~S County, Jexas Lat Long: '\Jif\ Depth Feel ~--_._--- Symbol i '5ample i'l (bpI) I j I 10 'i I 1-; :I, "; PP lISt) MA TERrAL DESCRIPTION Dark f'1 r-:LAY with C11Care()IIS Ilorjules 1 ,Y' ; I ,color Clang!", 10 tan al'ld gray with calcite crysta's ilrld "(l'1 oXide c,talr,,; ,c 'J color CI1,jnge:, reddll;t1tar 31ld tan with JYPSlJirI j',poslic i CH 7074iDEPTH 150fceei donng WdS Oflllee! dry to the teml/natlOtJ fepth Groundwater was not encountered funny dnlilnu cJlie! sampilnC] fight ,'00 jt --..-'______n_.---.. "__~_ __,___ -...-,, h.~ I(L[I,~rrlf)I:_R Boring Number Date: October 29, 2003 B-2 Type: 3" Push Tube Me 85 0.9 O/~ PI UDW Qu (pet) (1st) 34 34 60 38 31 65 47 94 10 Addendum No. 3 Attachment No. 1 Page 12 of 44 III L()(; OF BORING PI-ojecl Suuthslde ,vater T ral'srT1!SSIOn r.,,1aln Phases 4,4A, & 5 Loc<lfion: Clrpus Chnstl, ~~U'jCt's County, Texas Lat I Long: N? 1 38 23 3" V (.7 )4' 45 ,1" Depth: 5 b' I Feet ! ym (J "'---r"--"-'---,--,"~---- Sample : N (bpf) ,~:r) MATERIAL DESCRIPTION o a i k C:;. d y F JI '~LA Y --~ ~. I . ~.~~-;;;; "~ '//~r~ -0., :/. I "I Ta! .)ll(j GliJ., .,"an CLAY with ,rOf' oxide stC1ns~r:J dreous f10dules w'tl! r;V')Sli "qJOSits J far fwd ,_ t f I ! .- - LC2J 'Oilty CU)Y w.th sand lenses I 25 ,c, ---+-..~ ._----,-~--- CL I Tori;! DEPTff 150reef fJonnq was or ,jJ,.(} dry to r'le terrmnaf/on Jepth Gr,:;undv,aler was 'wi encountered funnq (frl/fino Ci(i(! sampllfH] 2. .~ .__..~-_.- '," ~lgh~ c~oC' I,; ~j; k"{J J( LEI N J rID f I~ Boring Number B-3 Date: October 29, 2003 Type: 3" Push Tube UOW (pef) Qu (tsf) I '/, I I I I PI 25 46 30 98 O! 97 0.6 Addendum No.3 Attachment No. 1 Page 13 of 44 RI Project Locat iOIl: La! / I,ong: I-J()(; OF B()RING Suuthslije ,Vater T'anSnlISSIOn MaIn Phases 4 4A, Jrpus Ch'!stl. NUHces County fex,ls \J 7 38' 156", W ~:/ ;'4' 30 7" r--- ------ Oe) h _ pp pI Symbc'l "amp'" N IbpTI f I pet IS ) ~I " 101 MA TERIAL DESCRIPTION O,lI,". (;'oIY C,,( CLAY ivln, [;alcarE:Ous nodules 1 " ?: -CollY CI,dllyeS Tu tall drld ~;rdy with 11(1) 0<: de stall:S "'Kj ( aerie crystals ') CO'UI chwf)e'. 'il Ian ,"lid IID!ll reddish-tan ':::olor Chdfl~~t~S, 1(--, tan and qrc]':~ ~) : IS CH ~{I r';;;ht )00 !.d\Jt', I ,--_--1---1___" _ >;; 'O:'410EPFI 150Feet lonnr; was dnl/eef dry to tile terrmnatlOn fepth Gr,)unciv'v'dter was not encountered funfir; dnJllnr; <'){i(! c;amp/ing &5 k~ I( L !: I i'J f f L i) f h: Boring Number Date: November 11, 2003 8-4 Type: 3" Push Tube Me -200 VOW Qu % :: t:T'" (Isf) 100 40 .'. 23 21 ~ 27 96 28 67 44 96 16 Addendum NO.3 Attachment No. 1 Page 14 of 44 RI L()(; OF HORINC; Project Scuthsloe \Vater II ansrnlSSlon Main Phases 4 4A. & 5 Location. Ccrpus ~h[istl, Nucces County fexas Lat / Long: N?, 38' 15 T VV 97 ~)3' 48 :" Deptl. Symbol . cpt op ,(sf) Sample N (bpI! MATERIAL DESCRIPTION Gray Slit'l ,[ j. '{ i~ 3'w!th sand ienses Tan Sandy C! t\ Y Tan L ea~! Cl '( )5 '3ray Claley :))';ND 3~ 3reenlsr .(:;1 ay f' 3t CU\ Y with silt lenses 2 j ,;olor chdngcs tD tan and reddish-tan With aleareoLs nilduks and Iron OXide stains " l' , ,l)yngh! 70(' "'I! .,;'I'~ld~" I Me ! 0/. -, yl (c'126 ,c,j I I I 33 28 27 k.1J Kl [f ~'H H D f I,: Boring Number 8-5 Date: December 16,2003 Type: 3" Push Tube 2" 00 SPT -200 % UDW Qu PI (pet) (Isf) 42 241 ~.. 45 28 32 37 80 53 Addendum No, 3 Attachment No. 1 Page 15 of 44 10 L()(; OF BORIN(; Project Scuthslcie \ VaterT I anSnllSSIOn Main Phases 4,44 & 5 I ,oeatioll: CCirpL;s '::hr is!I. Nuecesounty Texas Lat II.ong: N ~P' 38' 157' VV 97 23' 48 (" Depth; Symbol Sample ,., I bpfl eel i ,,,1...._1 -___c . ! } I I 1 l ~ h C i HI /< ~j ~, i i ~ I l I '::'0 , pp dsf) MA TERIAL DESCRIPTION Greenlsr(ircJ\ i at CL !IY 'Nllh silt lenses (Conlin lecJ 28 -- - Lt Reddish Tan and T an Lean CLAY with calcarecius'lociiles 5 3 Tar' San,]; Cl {'.'i 'J'jith cdlcarpOlis n0dules fan Fine Slit, SAND With calcareous nodules :olor changes Ie eddlshtan becoming nore coarse I I I lCri) I I lCI~ k~ KIl::iNFrt.DI::I,; Boring B -5 Number Date: December 1El, 2003 Type: 3" Push Tube 2" OD SPT Me VOW Qu (pet) (tsf) "' " 20 33 20 111 07 23 14 Addendum No. 3 Attachment No. 1 Page 16 of 44 RI L()(; OF B()RINC; Project SCuH1Slde Vater Tansrnlsslon Main Phases 4,4.A., & 5 Location: '_:urpus Cr istl Nu,;ces)unty rexas Lat II AlJIg: N:T 38 15 7' \V ~!I' 3' 48 Depth r-ept Sample N ibpt) Pp Isf) Symbol MA T ERIAL DESCRIPTION "I I TcHl Fife Sit, (AND veith calcareous nodi:les (C(::(.itir; /~J(f ~5 '). '5]' Reddlsl . T;3rl .Hcj Tan F:Jt CI ;\'{ (,0 ,)cP: (5iJ (] FIH'r BOllnq l\ as <fri'!,;:J dry to a depth of 12 0 feet ~round~\ ate: V;,lS encoun1f?red at a clepth (,' .? 0 feel C'Uf/IJCj ,fn/llng dnO sampling )wllc/7ec to n Jr J rotary atl 2 0 feet 1J5 I, .~ I I I ;Sr.1~ ! I 24 I Cf~j lfll<Ll.INFEi DH: Boring Number Date: December 16,2003 B-5 Type: 3" Push Tube 2" 0 0 SPT UOW Qu I (pet) (tsf). 43 I 104 1 3 Addendum NO.3 Attachment No. 1 Page 17 of 44 ,.'/fight 20C ~: I. "'Ir:ldo( '1' -- L()(; OF BORIN(; Project SOUP!SI,,8 \\/ater lran:;nliSSlon ~J1aln Phas(~s 4,4/\, & 5 Location; Cc rpus ~hl stl, ~~uE'Ce:; ~()unty 1 foXdS Lat / Long: rJ:' -. \8'.i7 7" V 9/ ]' 09 ( Depth ' f'eet : Symbol Sample'~, (bpI! ,>p ,(sf! MA TERIAL DESCRIPTION D(Jrk (;13'1 cl'lCj '1Odulec'di1rj an Fa! eLA v with ('drearer,us OXlrj(, ','",Ifl', (' -cole!'" (r ':j("1:)1-7 i LJ/l ;:-:rlr1 qr';1V \/v'ith calcite coler cl iil~Jt", ! tdf1 dl! j IHJlq !PcJdl"Iltdil Niti' ,P' 'lSlts I" Tn:!,! JEPTfI /iJOfeel 'ionng VIi IS (tni/( 'cf etry to tin: terrmnatfOn feplh GI)lIl1cJ,v,Jler w,]s nol encollntere,j lurrnq (ir:!/mc ulf,f sampllnq ~ I j --=-- k~ K l [ !'J F [ l D F U Boring Number Date: November 11, 2003 8-7 Type: 3" Push Tube PI .200 I' ':_ LL _n -t-- 2] 52 36 100 26 I-J 161 93 25 I r 53 37 102 CH Addendum NO.3 Attachment No. 1 Page 18 of 44 -:;~",'ngr,t 20f "\ '~'idi RI Projed Local iOI1_ Lat / long: Depth S b I F('Pl yrn 0 Ii! -j ~.: - -~-2{,.,.., ; ~-.- .; C,:,,/,_, i. ;~~ :~~% ~-/:. ~II -. M I l~~. ~ I , L()(; ()F BORING .3c uthslc!e Vater ilnS/nhSlon Main Phases 4,44, & 5 ':crpl~s :h 1sti i'JUl:CCS (:)unty, ex,1S fJ;' ~8' 217", \-'v e,l' :'2' ~)1 ." pp 1:'drnpie ~,'hpj, Isf! ! ~ I ~,--~._-,-_._. l.;flghl )OC c t(::J MATERIAL DESCRIPTION Brown JI!eJ C;ldl Lean e:LA\ Wllh calcarecus n()cule> IIel , OXldp >,talliS 'J' .',' CClI'lf :',,111<)' 'u t31' c"I,,' (I ;Jf'Cj" tall .lI d CJl,1Y '.\,,'1, ';ilt , Ii' I d lell " eC) 01,1/ UEPTh 1, 0 Feet Janny W JS (ju/lelf dry to ttle ternllnati:Jn feptl) GrCUlI(j,\utcr.vas encountered at a lepth JI J 0 feel Juring aI/fling and <ampllnq k.~ KLEIi'.ffLDiR Boring Number B-8 Date: November 11,2003 Type: 3" Push Tube Me -200 ~/o %. LL UDW Qu PI (pet) (Isf) 26 93 20 38 46 26 88 36 85 OC Addendum NO.3 Attachment No. 1 Page 19 of 44 m Projecl Location: Lat Long: I_()(; OF BORING S'JutrlSlie Nater T-,m~;fHssiorl ~vlaln Phases 4,4A, & 5 CJrp,J~; ernstl, NLHCfS C,Junty rexds N ? 7)8 30 4' \V (, 7 .'2' 2t~ )" Dppl h Fe'et Symbul ~.,----.._...---......,--~.__.._--"-_._-- MATERIAL DESCRIPTION 5dmpf,' 'J (hr,l) I j 2; ! i[l/right 10' pp .lsf, Dark CoilY ell 11(J(Jule', drld Tan Fat CLAY wilh caicareous OXldf:: stcllrlS COlor C 'l'JIlCj"" to brownlsh-qray arId gray With sa 11: 1t~1' COier CLlIl, JI d,'pe,s.! , tan 11(J elrdY Witt. CJYPSUl'l '/.1:1') c,_-~:cdf ,la:s dr;(j<", rflc1iJ'st I;j,' ,Hid t.!!l ( ,:I!iii', t J few cllJU i!<jilt reddish lal- 3' Reej(j,st', 1 dr' .:1:1: Tan Lhill CLAY With calcdrec .is I j n,s and lion "xldl' stair'S lC". .. 1,,{ ()EPTH lSOFeet 80llng ,VlS (fn!/,'i dry to tlie terrTJInalJol1 ieptll G:UU!lCilhJler was not encountered fUllne; clr!/!in..J i!'I( s3mp/i{!(] J...... '.:01" k~ Klfll",JEIDER Boring Number Date: November 11, 2003 8-9 Type: 3" Push Tube 28 58 37 90 56 39 tel Addendum NO.3 Attadlment No. 1 Page 20 of 44 -. Deptt Fe'ct Symbol c.- I"",mp,o N ,0,'" I I III~' %' / j c:@>;?: /~'0' - - (~ i,n~~ III Project: Locat iOIl' I . . .at / 10110" ...,. .jli y ", "ghl .'oe k~ KI . LI N r E L. . D i I~ , LOG OF BORIN('~ ,0 JUl' II' \ ' , "t';, ater 1 J I c'rp f lll"[' . / u~':h ~ . .,1~,SIO ~ 'I ' ,II, Nu(' , " n "lain Ph ; -;- ~8' ')2 4" Ir./ce,. c'..Jntv 11.'X' asps 4,41\ & 5 ,\ (j 7 .' . . dS ' . / ,)' 12 Date: Type: Boring Number B-10 October 2, 2003 3" Push Tub 2" 0 e .0. SPT pp I'sf) MATERIAL DE --- Gray &) . . SCRIPTION all'.. (, j" F IrO'l CiXI('(' , ' ,dt! A. 'y . .,.cJ ' rnottled)'wIU' 30 , 74 I I 32 I CCJ'(H ct .. clrl(J') t, 'I t~~r~ 0 c ,I Lx '.; i ;1 l' 54 I 3~ I I .J I i 2~J COlor cr :a!c!l ' .cH1C;(i', ;, i liil1 &. . (. ysl jl' i llhl 'Pc'!j . ....Isr' tan \vtn v\//!h ;,I!L )(:!'lU t ses ~~ (, ,. ~cl-q an. L (c'I' C :'LI'V' ,J " -""'0 ^ L . \, ('J ,.tt,;19hl h:c.'Cl(-"C"l.... , I ,'0 i I~ cj , ' '- ~ ' ~) .\'itll IIi' "" I "II L e']', II :lXJcJe sL::-1IrlS - ,c! c; .2 ,.oiur:;t:,J'IC'I' ,1, t' Idll -;--- + TU'/,I lEPTf1 15 (i F-ept jonnq w' '. .' ~. Ie th~ (/,c, Unlit~(1 'J I ; p Gnunci' " ' ry to tile lor ,I' ,epth of ; ') ~hl,er W3' , '. nnnatJon , 0 fel".-J C '.' ,neaunt ampling C.. ,uurinq (in!! ereci at 'J o mlll/..llf . JII)UrlOwatpl'-r' '. ".19 and ' . ~ ~ . ( <e I" 9 .'.' . 0 feet after "'id, III Project Local ion; Lat / I,ong: Symbol ~ ~ , 1 {~' ---~~ ~~~ f~~~~ c. '>/::{>:0 i.'~: .."..../.%./;:-, :~0 ;;:::>//: >/@0~ ://~. ~ :" :/: /,0, ----->/ %;~ ;.':/./.;W~.' /::%% . [',,:,'/~,/'~I/ c/ /.;....' 7/~ :':~g: ..J....%:, /:- ~ ~H .~ ~ Lf)f; OF BORING uH1SIIle Vater T ,HlSITlI';SIOn Main Phases 4AA, & 5 C:mpus Ch 'stl j\Ju,~ces (;')Unty ! CXdS ~,~ )9 10 \Vell /2' 2 T pp ')ample N (bp') tsf) MATERIAL DESCRIPTION , I D3rk Glays. [an Fat CL,A.Y [FILL] (nlottied) -T with Cd<dr"ClI nodule', & ,In oXide stal:)s I Fat eLA Y (mottled) with (CH~ I (CHi 119 I I 10 l Y'I Gray &'JarK :ror nx',ie sia l' r d r~ 8. iJ',in CLAY (mottled) with C(l!CJrCr 'liS "l()( Jh:s I -Wft!' :. "Llls & :-:.tc' .llie stains With ;Id Sdf\,: -'rises 2' -12,0 Tan & L fJilt hl..rjd:sh-T:Jil Srit~) Sandy CLAY nl(Wle<i l' Tan", F:!cJcJiSI r dn Silty SAM) (mottled) SM ro'L.! )EPTii feef 'lonng WlIS (jn/le(! dry 10 tile If:[ minai/on feplh GI JunciwJlor was enco)/fIlered at a Jept/; JI ';) C f('C'! dunng (inll/liq iJnd amp11n9 (;r:)1.1 'fwa/or riSE? II 100 fuel afL'r . 0 rnir~ uft.- S :7 flghi ,")l' ".',j(. ""--'"-"---. _. ..---.---.--.....---..--..-...------...... k"l Kl[lr'JfEI D!lt Boring Number Date: July 21, 2003 Type: 3" Push Tube 8-11 Me -200 LLf" UDW ()u ~ 0/0 % (pef) ~ts~ I I I I 39 25 103 1 3 23 58 Addendum No.3 Attachment No. 1 Page 22 of 44 RI Proje('( . Locat ion: I.at! l.lIng: Depth Fp\;>l L()C; ()F BORING Scutnslde \Vater T clnsrnlssion Main Phases 4,4A. & 5 ~(!fpUS~hi!stl, NLWCCS C)unty. I CXdS r~ )9'30 l' VV C)! l' 48 c!' PP ;tsf! Symbol Sample t'.. Ibpfl ~~/;~~:;;;./;~.. . '/////~/. ..,I/.@.%%/;........, >~~. :. .si..~.I........ .,>@i;~...., : '/.///0 .>.%% -.4;~~ ' ~~~'.'" ;.' :..:,:,/.'.-.~..,: '/~~' ."./@;,~ ,.';;~~,. ',.,L 7";7 / ,///./, //-.//,' //,~/; '~'// , /,;;~/ / I!J/~":~ ----:- . //:></ ://-.<<> ' '/;/ ' i~~~ . ;..','...I~'.. ,..~;~ 1"~'~~0 :1' MA TERIAl DESCRIPTION ~ ,- Gray (x Tar ~,[!tl Sandy '':;LAY WILL] (mottled) Wit!, ~al';'j"'oh llOdulec; 8" Irun o>:lde stall1S 2:, Dark (;ray ,:s, (;rdY Lean CLAY (mottled) with caicare,)liS 'Iodides S I )11 o>ide stCllns ) ~~\ ct:lIl.jC", I) tan 8, :jlav Win! gViJ:;ur[ if'POSlts Tall Cia e1 c;/l,f'>JD with CYPS: rll depOSits & :al';dIC'" ,s ' 'es :-i vVllti rOOf in j,'~)tdlflS Tan Silt\' ~L_A Y WllIl 'JVpSIJm depo~~Ss .T 130 \7 color chlllge~, Ie light tar & light reddish.tan " mottled) w!th r(1I1 oXide 'itams & silty sane ,jnseo. . , ._.~---+ iCL ! () Ai iEPTfi 1 [) 0 feet "3ar/ng WciS cjnliecf dry to tile terr7Jlnat/on iepth GlJundvriater was ,'ncountered at a feplh of ':1 0 f('cl during cfn/lmg and ,ampilng C;" j(jr)('!water rc'so to 1? 5 feet afler '0 mmutt S ..qgtv?OC ."ilj,> , . -----'--_____.L.. _"'\ k.~ KUINFlI DER Boring Number Date: July 24, 2003 Type: 3" Push Tube 2" 0,0, SPT 8-12 PI UOW Qu (pet) (tst) 19 1CJ 41 25 109 2.0 24 4;'> Addendum No.3 Attadwnent No. 1 Page 23 of 44 10 Pro.je d Local ion: Lal / I.llng: I~()(; OF BORING 30uthslde ''later clnSrTllssion Mam Phases 4,4A, & 5 Curpl,S .~h:stl. NUi'ces Cuunty r eXdS ~.~ ? 7 39'54 G': Vv q? ,1' 33 f:" Depth Ff'(~! ..,.---'---;---'-'-----_.~.- MATERIAL DESCRIPTION SymbOl Sample iN 'bpn PP (sf) :::m~'. r :;%~! ~.~.~-~....-.j '% /, ;/./ %....: V'l//:: . lt~/i A' -: :~~; .;.........:.: ~~; .<~~' />~~ ;.:i~~~/..' -~~;j7 7;" ////%-' '. ,,,/,///;: Z'// '/~: 'T_; ;<>/~: ,jr~~ IS .. ..~~.... \1'9h :!01 v, 'c,j - . L~ Silty S~ln(ly CLAY <mottled) I lCL~ I 1G I I I T:m 8. (;'Jy l cail CLAY ['= ill.] (tnottlec) with !fOfiJx:de .,talli'), gYPS.iI)' depositsS. Cilicare')iJS ri,)(jules Tan .'\. [>~lrk I' 5 Tel" 8. L.~df1 CLAY (:l1ottledi with gypsum (~epo:A';> iCOt >.",de stew'S 8. caICarf'( >LS 'ceilries .color ci (;,11(~L~'-J to) tan Tall 8. l:.jht f~.~ddISh.T,Hl Slity C,ay",! SAND mottled Nith 'Jypsurn jc~)oslts I SC) ~ Ie no fal' and light Rpddish1 ,lIl l i~;lIl CI. A Y mottled \VI ;,:' lense,; witn QypSUlll rjf'pOSlts ! r) tli/ !)EPhl Il, 0 fuet 'lonng ,... J:, uulleri dry te tile lermmatiun iepth Gloundv\/ater was encuuntered al a lepth of 'O' 0 feDt during cin//ing and amp/lnq'JI<)ul<c/water 'ose Ie! 11 0 leet after o mmut, T \;' :CL k~ l(lU~-JrU DU{ Boring Number 8-13 Date: July 22, 2003 Type: 3" Push Tube 2" O,D. SPT i r::2 I ':J.o L ! PI VOW Qu (pet) (tsf) LL -r I I I 19 37 24 112 1.4 Addendum NO.3 Attachment No. 1 Page 24 of 44 10 L()C; OF BORIN(; Projt'~:t '3Ciuttlslde Vater T'clrlsfllIssion Main Phases 4.4;\, & 5 Loca. ion.: c:> HPLiS Ch Istl, Nueces County. r eXC1S Lat/Long: \j?7 40'121".l/v~)7 :)1'228" Depth Symbol Sample N .bpl) ~~) Fpet ~ I ~. I .._..__.__.~ ",(1~ro1 MATERIAL DESCRIPTION Dark (3 ay ,;;" ray Fat CLAY (mottled l WItT Jr()n Ji',j,? <taliI'. & silty ScHI(l seams ~-) -color C'~dngcs '0 gray & del'". CYilY Nlth calCarCl)IiS 'Ii)(jules '). coil)' ,;! 'i'Jrlqes If) light qray .>;. cd'] w,th gYPSJI1' Cepo,,!; -colv Cldrl'HcS 10 tan & qr av With cilclte ccyst;]]s coler 1.1 ;,fji,C, t ) light rcdck;'l ,;,,'1 ? II:Jht olive / :J WI:h ~,ltl!I;',t;'.. /~ colOl chlllgeOc ;and len',es reddrsr).t,c;Ci 8. 011'1'; With Silly CH Ie CL I ;JEP71i 'Ii () h;e: i30nng w, IS On/let! dry to the tem7J! ration fepth Gr JUlidwater was not enccuntered funng (jr1Ifn(1 dm! sarnp/mc) k.~ I< I f 1:'- rr! IH;~ Boring Number Date: July 22, 2003 Type: 3" Push Tube 2" 00. SPT B-14 Me -~J.O I 1 LL UDW Qu (pet) (tsf) " /, PI 20 69 44 107 79 29 98 19 Addendum No.3 Attachment No. 1 Page 25 of 44 RI I.()(; OF BORINf; Projed Scuthslce "later) r3nSfll!SSlon Malrl Phases 4,41\, & 5 Lo{'al ion: C:c rpLs:hr Istl, Nueccs uunty. Texas Lat / I.ong: iJ" w'n 4" VJ q7 /1' 8 1" Depth: , '.1 pp fee! Symbol S31llpi0 r-, ,bpI; ,Isf) MATERIAL DESCRIPTION 1~~~~ )~ ~.: '.8%:0: '//~<% ' ~.. ;~~ 'c:~Wffiffi ' ,~;~ - --':;~~~ '/m~:0 m0 ~/~' '/~% ;'/~0 :~ >-:'r~- -.". :S,//~~.'~,,'.." ;..~~, "%/// ~<~%:>/ ..; ;')"/'%~ _."-j~~;~ " '/%/,0 :,/'",.~~~,h,h,'.,'.';' ,;~:~, - ;;'j~m 1 .~/ 1 .. Gray Lean i~1 !\'( with gypsum depOSits !Un ox.de sLJ'rl' ,J:,;areOdS Iloejules & Silty salld ler'ses .celo: ci dnqec, i:l gray & 1<111 imottled) ,. )-'- COior ') ~Jrcl'y ',,,,U' cuarse ",md ierisC's >' .~ SilT! colol CI1J:1g'-". dark CJI,;y & tan (mottled I .vith gyp"lIlll d'~:Juslts 15' fan Fat t;IAYwlth Iron oXide starns & lYPSIFTl r,Jepos.t; I::; " ' 'AI iiEPTH 150 Feet '3onng IV.!,'; Jnl/eej (fry tu tile lerll1lnatlofl Jeprh GIJur)(j~l;ater was encountered at a iepth of ,() () fed during (InNing and ,amplll7Q :')w(,{cfwater ruse to 90 feet after o mil/ute.' 'II 9 ,. '(i ( ICH I I I I (CL~ ! k~ KlEIi\,HLlHR Boring Number 8-15 Date: July 24, 2003 Type: 3" Push Tube 2" 0 D. SPT Me -200 i % LL PI UDW Qu (pef) (1st) ~/~ 14 113 20 Addendum NO.3 Attachment No. 1 Page 26 of 44 Ilg~-" 20{ ..; ,j.~ 10- III I _()(; 0 F BORIN (; f)rojed SOUU1Slcie \Vater TransnJlssion Main Phases 4.4r~, & 5 Local iOIl: (~urpus~hl Isti, Nueces County, T eXdS Lat / long: !~~) +0' 47 7" W 97 )()' 59 3" Dept ~] Feel Symbol C ' . 'b f' PP .,ample ,,( P I ftsf) MATERIAL DESCRIPTION f'~~, ;~. ~'~~, ,~,>. ~~..i f~.~....:.. /.%%.... . ::0;//// ~~~/: " ///.~/W//0. ---4>:/;/ / // :'.:.W~~'" /W/'h' ;/.~'.: c;~~ ':............. .W~. :.,m:~.'... . .' /:;;;;//, /;%,% . :~::~ .../.......~~W. ill ,<<<:% // ~,..; >>.//// .//// .//// / ..//../ /::./:> :;:.:;' ,,/////. ../////.' ///.'/^ . ::;5;>;>;;' /~//:> ./L';Z', Dark Gr ay & ,. ilf1 Lean C U\ 'y (mottieo) Wlti gYPSUrT' depos'ts, calcareous IlOcJUIE'S, lro' 70 OXidE' sL1;n~ &;,md lens(~s -col<1" dranCjes tu gray. Ln, & txow' ) ~-, -colcH clance; tan & ilqtlt qrav o ') Tan Cla'yey SAND with IrCJll oXlele stains & qypslIm JP.poSfh 15 fan F!fle Slit'l S/I.ND i., :0 iAr OEPTH 15 0 feer '30nng WdS dnl/eel (fry to {tIe terrmnat;on 1epth Gri)undwater was encountereci at a 1epth of "1 5 feet during drilling and amp/mg Groundwater rose tCi 9 0 feet after '0 rmnutes L "'J 'T; n ., ~2 '~ -,~ ~},,'fI9rll 20C -(k ;r,>i(j{-r iq T 11 ;i "u~ ! I :;0 - ; , iSM k~ l<1.11!'JFtlf)El{ Boring Number B-16 Date: July 21, 2003 Type: 3" Push Tube 2" 00 SPT Me i -200 0, I DI .'0 ! 10 PI UDW Qu (pef) (ts f) LL lG 33 18 113 1.8 ! L I 19 112 10 37 Addendum No.3 Attachment No. 1 Page 27 of 44 III L()(; OF BORING Projed. SOuU1SICle \Vater Transmission Malrl F)hases 4,4A. & 5 Location: CClrpus ',~hr!sti, NUE'ces County Texas I,at II ong: ~J?!' t l' 1 6" \IV q7 . )!T 50 E)" De[Jth S b" I Feet' ym 01 ,"<lmp e Pp I'Sf) N (bpi MATERIAL DESCRIPTION r~': ."..:~;0.. :.... ' t-;g~ ' II i.~...._.'....';. ':m: '~.~/ .">. / /// .,' 0' ---4;.:.100,W; ~~;'.". :~/. ;/ /_> ...f.';.~~,.~.~..... '%~~-/" ./.' ';0:;///, ,':/.(LLL/L-:' : Dark GI 311", 17..1Y Learl CLAY (mottled) 'A 1,1 ifon ClX!(je st;1:r~:. {~ CaICcH"f;OUS nodilles 75 color ctanc)es t,) gray & tdn vVlth Sdlld ier-.c,es CO'Gr cr'cH1Cj(' !,) tan w,t!i CJYPSlJi1I clq)()SI" rem & DclIk !-=>: ay Silty S;Hldy CUl, Y (rnottlwj) vVlth CJYP'lJl1l cJr-"pOSlts & lion oXlrJp stllns .,'~) fal' Silty SAND with gyps!lnl depOSits ___.J.~ .'1 r Tarl SAND wrn;.!! JJ ~; " 5' . )Iive & Tan l ea'l CLAY (mottled) Wltr, I Jypsurn oeposlts, iron oXide slams & sand j,enses " '01..-1 IJEPTff 150Feet ;J) l' .'11 c " .~ , ~ , T. 2;:" donng wa s dnlle.j cfry to the termination 'epth Gruunefwater was encountered at a i .'epth of 9 5 feet ouring dnlling and sampling r;roundwater ro,p to 75 ft'et after 10 'Inutes :.~r,:(:qht >1)0' ,.i'lp, i Y ~CJ ICL k~ i\L11''Jr[LDII~ Boring Number B-17 Date: July 24, 2003 Type: 3" Push Tube 2" 0.0. SPT Me ,200 % UD~ I Qu (PC~~~sf) a/a LL PI Hi 113 4:) 1(3 32 19 110 I 17 I 14 6 Addendum No.3 Attachment No. 1 Page 28 of 44 III L()(; ()F B()RIN(; Projcl'c '3C!uttlslde Vater T iHlsrnlSSlon Main Phases 4AA., & 5 Location: Corpus (=:h Istl. ~juf'ces County. exClS tal I Long: r\J )8' 58 f)", Vv ell l' 44 C' Depth Ff'et Symbol Sample ~j (bpI) PP Isf) ,~~1 .i .~; f~~ ---4B : , ;.i - /R~; ,)~;r~W ~+- / 4- ../// '/ k,~,// ;'..~.%//; ; '~///.' ::;:W~//," '~% -~.~..~.~.....'.: ./~fi> vl."._ :~.~.~~:.." ::}~~~ 15// >>~~' --f------+ 2i I ,yrigr~t 20i K ,"Ipi(k: .n MA TERIAL DESCRIPTION Ok C;:I" 8. T i1 Fat Cl/IY [Fll Li (nloWed! 7: Gray Lean '::1 IIY with Irllr1 oXide stew's & caicarCrlIJS'10<1:J1es (C~ 7' , -colcy C"llnf1C', ;) gray & 1,][1 'Nlth gypsum depOSit: () colo (', "Or:-,'. I ) tan & Idll qrdv DiJrk Ll 1 S 'i i ' lAY Wltll C1VPSIWI depOSits 1i" calCite c with ~~aj :,lft ()!', 1i)(julC'~, 75; J fan Sand; ,q eLA Y WI tli Iron oXide stains 14:] Y 14.:5 r7 lei: 'I" iJEPTif 150 Feel F30nng WdS Of/flU} efry to Ii Ie tenTlinat:on iepth Groundwater was encountered at a feplh of '4 S feel during irilling and -,amp/lng ,'JIlIl1l;clwater rose to 14.0 teet afte o mmufi k.IIfJ K L Ie I ~J f [ t D [ R Boring Number 8-18 Date: September 25, 2003 Type: 3" Push Tube I Me -200 : . % ~~~_f'1 , I "In I UDW Qu (pet) (Isf) " '0 102/ 22 21 105 14 21 Fl J. c ,) 22 111 1 J Addendum No.3 Attachment No. 1 Page 29 of 44 III L()(; OFB()RIN(; Project: SO~U1Slce \v'ater T!dn~;rllsslon Main Phases 4 41\, & 5 Loration: Ccrpus :hr:stl, NUEces:ounty Texas Lat / Long: N ~'1 j8' 53 1". IN 971' 32 3" Depth,s b I Feel ym 0 I . I pp Sample' N (bpf' (tsf) '~;;:? . .1 II 51 il " . 1(J..,.'.......'...~......: -v.; ~. IS 1/ I) S -L ~u 1:=:; ;j,'cight ;:'00 t; -dl.jdf MArERIAL DESCRIPTION Dark GrJY .'; :Hi Lean CLAY [FilL] (mottlccn with ')hr'lI Ir ,Jcrl" ,nts & riCH' o'.:lde stall1S !;:", Brownlsl1G'd' (x Tan. lean dndy CLAY with she! j colol cr 111,"':' ) tan & 'II ,n ,vdr, sane! lellS;:') T;:m ':[ ;oY with !I(F' oXide stains color clul1<je: tan & (if aYNfttl UY:'SIJ'Tl Jeooslts ..... (lie;:, i~OUS 'locule:; .~ colOr :;1) I'1U'? tan & IJ! OWl 14 () 14 ~ y '.7 I ct' '/1 /JEPPI 150 Fec! joring was c1n/Jeo dry tu tile termrnallon iepth. GrJumfwater was encountered at a iepth of 14 5 feet during drilling and amp/ing. GmlF)rjwater ruse to 14.0 feet afftr o mllJute s k~ KLf:II\iFfLDIR Boring Number 8-19 Date: September 25, 2003 Type: 3" Push Tube Me LL I PI --~---'----n I I I [ l I 01' L I .200 % UDW Qu (pef) (Isf) ~IO 1:) 1 e' _! 108 H3 31 17 111 13 20 105 Addendum No.3 Attachment No. 1 Page 30 of 44 10 L()(; OF BORIN(; NI KUINlfLDII;: Project. ~"O'Jtrl~)I(]e \ ater TrjnSrTllSsion r\klln Phases 4,4/\, & 5 Local lOll: Curpus (~hl stl. Nuc:ce~, County. Texas Lat / long: ~J? 7 ),8't9 l)" 97 l' 23 7 Depth Feet ,Symbol Sample N (bpf; .~r.f%~/%..~..'.....':." v~~~//. '. ' .+~ v ~/: ,~%i .:)... fM; ,// / v' . v I. ;;; i/ . ',///_'<' -;< 0~/;. ~.:.~.~0~,~ '.&;~ ....~~/~,.. '/: :~"'~//: :; %{ 'B: ~..: JIJ'.~...I ' ~ - </.-.-.~ .z:_ j' ! J ~ " .--------r--,._ :(1 '~ I "~---,~ '.:r'gt'.r ~O( -:J,r'~pldl Pp (1st] MATERIAL DESCRIPTION D3r~ Cr 1 f ,HI, 1 '.Hl I_edl C:l i\ Y [FIL l i Gra'y' Le,~'-1 C;r-r, 5 Tari and C:;i;j'y' ;" ;taln S/\I'JD 'tilth Iror: oXide 'NIt:' ,;al'drl:U, 1'.IOdld,;:, :, fail with (!J' OX,;(je slaws anc aiCdreOJ':; j\jies ,J :) df I L:cl! t.'\ 5' fan Srlty3AJH )7A UEPT/i 15:}Feet iOT/f)'j was OI///tJeJ clry to trlC tern1lnatlOn Jepth Groundwater was encountered iJt a iepth of 72 0 feet eluTIng dn//IIIl] and .amp/mg, Urc :Jf)7\Vater fcse '0 9 0 feet afte' . J rTllnule s 9 i) , ) I.';M/ Boring Number 8-20 Date: September 30, 2003 Type: 2" 0.0. SPT Me . -200 I ~ _~G_ ~_G/~_L LL . PI_ , ! I i i 22 58 23 44 S'c' " j ~ T UOW Qu (pet) (Is t] -t-- 22 35 ! 20 . .~~ Addendum NO.3 Attachment No. 1 Page 31 of 44 III 1,0(; OF BORINf; Projet I: So JttNeJe Vi atel T r3n~,mISSlon f'v1alfl Phas(;s 4,4/\, & 5 Location: Corpus Chr stl, Nuece2; l~uunty,T eX;.lS I.at II ong: N 27 \8' )99" IN 97 45 r r~~~!,::~- Symbol ~unPle N IbPf)~~~---- ~~~~RIAL DESCRIPTION r 1/ " Caek C;,:/ ""em Fat FAV [fiLii wIth "ltell Gri!'; F,j' eu", '1/ I :;~~;:>0 >~~ ! .t........~.~_~.II.. ~ :;~~ Y f/ , r~;;: ~ r/ I ( r-4..~_ , '. L. ~......../~~{ J ,,//~ f':~' r;;~ l.....)~ ,:;: ,/ Yo v.;dh)!it. '-)(: ')i ~ f'nses :ol(ll :hi'11rw:, ".\ ']ray iWI j It (iri1'/ with Iran Hide Stid"::; ii; 1'1(j 1(;, 'icJrlcJy ,.: l !~ Y WI!f1 sili '~vlrh >;;:j fl _i it'" , , 5 t T;:1'1 ;Hid Cr,), Silty CL j\Y " 'j 0' yo f ,c' , CJ <ecJdlsh 'illl 3':<1 Tan Fill CU\Y with 119110 -'::idc st(]1 l>i ':;.i 'jlth calcideuu 'udules P/flght 20(" "-1. i;_!d,-' 1III<,l.fINrEID[i~ Boring Number- 8-21 Date: October 2, 2003 Type: 3" Push Tube 2" 00, SPT Me i -200 I UDWJ Qu % %~-I~I.:.~I _PI' I' (,pcf)_ ~~sf) " I , I i I 3G 59 31 35 28 72 21 Addendum NO.3 Attachment No. 1 Page 32 of 44 III Projcd Local ion: Lat / I,ong: L()(; OF BORIN(; )(iuthslde VaterdnSflW;Slon f'v1ain Phases 4,4/\, & 5 C' l;'PUS ;~h stl Nu(cesounty excls '\j 58 29 9" VI q / 45 T' Feel '.'---..------...-----. _._,-,._- ---.- MA TERIAL DESCRIPTION . " "pp Symbo' ""mpll' IJ (hp'l .Isf) Depth I , l:.:. , I --....L.... ~o ';:rigt1( "?O( Rcc~dls: T jn ,jrcJ Tan Fat Cl lAY WltI' ,ran ClXiC!!,l!f', 'ntinue(! 'lJnqe:l tan di"ir; it t:~ddlst-'I :an -j(:(;I' it 011\1 ;HH': rc(id:,~~!--tcHI ,CH T() 4!lEPTfI 400 Feet .'300n9 was cin/ice! dry 10 Ine teo7Jinalion Jepth G(.)und~valer was encountereo at a leplh of '9 0 feci cJuring (jrilting and . ampi/llq GrouwJwater rose I" 15,0 feet after o h"':l1 AI KLfl,~FrtD[R Boring 1 B-2 Number' Date: October 2, 2003 Type: 3" Push Tube 2" 0.0. SPT Me -200 % VOW Qu (pet) (tsf) LLtfL i I I I 63/40 I I I I 86 1 1 O' /0 J! 27 99 16 Addendum NO.3 Attachment No. 1 Page 33 of 44 III IJ()(; OF BORINf; Projec.'[:'~,o'Jthsl(j~; I,/Jater TransmiSSion Main Phases 4.4i'\. I.ocat iOIl: CCFPU S l ~hrsti. Nueces l:uunty Texas I.at / I Oll~: 1'\ L I '$' 8 ~)" I/I.! g 7 )()' 20 c; Dep,I' _~lp I'sf) Symbol S,Hnpl.. N (bpI: MATERIAL DESCRIPTION ,- er~i "~W;;:?: / :'l'/?: ,,;::. .; ;0>,,/'/ .,,%././ ~~j~ ;.~~ .%%~ /~ / '7 ',"~" 'l' /,:%//; :/ /'....-:/:/. r ""~:;;: " "W/;/;, "~/// " ;;%~~ --"---;/.'%//,. '/ '/0:/;" :-:::/--0~>0 /////0- :/'~/:/ ,,;~~~~%' /.c, -/ . <;'l'/~: ",/,m:,1: /~/:-; : ::~ ';;;. /~? /%/;: ~/0;':;:;:/ I" /:~<;;-. - -- W; // ~~; ,.,;:c.~P1 ..,.,':'."-;" ,-:@";;0J, .'..'.~~ II ...~.;W~~ ":- :~;0 ./;~~ .,'":~,/,,,.:';,%:i. /~;/j ,:.'.,../,;,~'~,'~,',~I".;:a :~f ':m::/ -- Oar!" Gr JI 'Tier "( ~alldy ( AY fFIU wltl1 ';1>,11 Gray all:! O,lre .' iray LeiHl (;1 A Y vVilt'i 1I0r' OXide st; llf)S , :) 1 ;.,:1 lit '1 Cl .'\/ With gyo~c,um deposils CDlol dLlrlge~. '0 tan aile it ljrily \VI:'l IrOil lXlcle Stc:!flS ;J!'(j calcareous J1l)riulc', an Sarli!\ SI!t, ('LAY 5' an S/\N ,:0 5 an and l t F~(,ddlSh-Tarl Silty CiClyey SAND 2. '"___ __._ ,._ __'___ [,qgh ?O(. ,.( 14 ri Y 20 14 ') 'J ,;M\ k.q KLEINfELDI!!. Boring B-22 Numher &5 Date: October 3, 2003 Type: 3" Push Tube 2" 0.0. SPT Me -200 I I UOW Qu . I I .. 0/0 I Ll: i .E'I (pet) (tsf) I u-r 2C 110 10 1 S} 35 24 114 .:L J 107 OA 22 Addendum No. 3 Attachment No. 1 Page 34 of 44 30 AI Projed. Locat iOIl: I,at / long: Depth feel ';cut'i r ~us I J : IJ)(; OF B()RIN(; :8 "\later 11cHbP1 ssion Main Phases 4.4i\. 'hr !S!I. ~'.uE'ces uunty exas i8' 185" v; 97 !)er 20 r,.' I "p Sarnple '" ibufl ,'sf) \ ;;'cdrlISh-T;'jf' Symbol i ! (;~;~';~. ' ;;~~~.. -_'S.);...... :. ;W)~; ,"m<~ /X//////. 'W~ {...~ ,~ :~. ,,,I J..:- .....{i MA fERIAL DESCRIPTION T;~J:1 )fi(' Clayey S-ANO '/ I I (C~MI "<I'y c"" ;<" CI ^ Y w'th "'cO 1 B :J j (J:l (lrjC OX!( j t~: ::-.; r ~,r'l j: Tarl a~1(~ L t ;-\! :~riish--T--l,'i :'If (:L,AY './.I~t Ir,~)ll , sL i-l~, ',: ,,~----_., COlD! Cl11Q'< olive & ',lI! >; hecomes L .c;licf'i'flS', If~d ,CH l/riqt'! }Ol .__...~.._-,-~._-. TO Li JEPTH 40UFeef IV h Uniit'lI (iry /0 Tile tcrmmailon leptl) G{~U!i(iI,Jter was ,}ncoun!ered al a Jept!1 of .1:; feel dunnq :inlling and arnplJl)i] Gr')1 ,r '1water m s'e lu 14 0 fpI:! after o fnlfJUfl" Ik.~ K 11- I !\; FE L D f R Boring Number &5 Date: October 3, 2003 Type: 3" Push Tube 2" 0 D. SPT , Me I 0/0 -200 UDW I Qu PI (per) J~~<;f) 0/0 :,7 18 58 Addendum NO.3 Attachment No. 1 Page 35 of 44 8-22 ~ ~ --...,. I AI Il)(; OF B()RIN(; Projed: Southslcje \/iater Tunsf1llssion Main ~Jhases 4,4A, & 5 LocatIOn: Corpus (,hrsti, Nueces (~ounty, Texas I,at I on~: N~' /' ~8' 0 0" \H 97 :)i)' 5 1" Depth pp Fr>e! Symbol S:lmple N (bpI) {1st) MATERIAL DESCRIPTION GrdV an j Tiw ';,11'1 SA~~[) with clay with srlO,I, I;Y'"'Jt surtal:c ] Y 19 _/~~J -.:...; );,;X:; : //0";; :",~,/~ ~ b Tar ,md Redck,tTan ')xlde SI"',lS 4 ',-' 18 ,S~jj ,;ycy SAND Nlth !Inn ! -. fClr' ,:~nd C;rdY ~:i\NO \^/ltt'l slit SC1 ?~h~ ,~~ /~{// //B :/~~%;~O "/ :/, 111 ,./~///" --~" .../.W;// I iI I-.,.>D :; ~SPl ral ;JfHl ~'e,'r1"r Tall ~;;lf'd/ /L il,Y f~ t C;rec:r i:.;h- (;,-;~ anc1 r :H: Lf~:Ht C~LAl \Vitl. .arld f';:'",es ,~olor dldllgf'S L) tan Witt: Iror' OXide stains md sllte'lses ,~~-+ ,CL ':)!AL LlEPTH 15 () Feet '3orir)(] was (inllea dry to the terrmnatlOn leplh Gruunr]wdler was encounlerecf at a iepth of 4 () feel (Juring dolling and sampling ;round'l/dI9r rese to J 0 feet [dler 10 '!inutec; ,'1.1 "ghl'OO N~J ~,11INrEIDfH Boring Number Date: September 30, 2003 B-23 Type: 2" 0,0, SPT Me I -200 I .. I %~+_!'I. UDW Qu 'Pi'''" 0;0 107 22 ,- :J ?3 2" ,) 12 Addendum NO.3 Attachment No. 1 Page 36 of 44 10 Projecl Local ion: Lat I -lIng: r[;~;)l.h Fpp. Syrnbu I ",ample ~ ", lO I _. I ! ) ' L()(; OF BORIN(; s< 'utrSlde Vater frJrlSWISSlon MaIn Phases 4 4A., & 5 )rpliS Ch Istl, ~'JlJ';ces (;lunty Tex:Js \1)7 591' \\C,( 1~-l'44/" I~ (Opi) PP 1st) MATERIAL DESCRIPTION f' .]',j Cd, ~;dt)1 Sf\ND I>J':)f :() tan II y 'r:1II /::'Ye', Sf\i'JD with : 011 oXlcje st<lIns tSf:'i I T;],-) j S C;rdY SII', Si\r~I' , ( iSM -..-....->------.-..------ ~._.~._-~-_.,_. (Ji,l, DEPTh 15 0 Feet 2fi .!';';: . "'ngr ' '-J Bonne; ,',3<'; ,-fnlle;f dry to the terrmnatfon feptlJ C;';lUllov,ater was encountered at a "fepth:;/? 5 leet ejuring dnlling and sampli[H) ::;rc'ur,(j.\ Cite' 'h'> to 3 0 feet i3fter 10 TII II uti' k.~ K i [ I N f[ IfH l~ Boring Number Date: October 1, 2003 8-24 Type: 2" 0.0. SPT Me ' -200 01", I " /0 + 10 I UDW 11 Qu p, (pdJ-,',n LL 22 G 20 ~~ :~ 2 , I Addendum No.3 Attachment No. 1 Page 37 of 44 RI Projed Local iOIL Lal / I ,illig: Dep!'l Fee' Symbo, -_.._-~ L~ L(lf; OF BORING ";CuH1Slde Vater 'an'.;rm.;sion Main Phases 4,4.1'\, & 5 C()rpus~hstl NlJ(~ces C Junty, T eXdS N?' ~7'+9 4": W 91 19' 24 B" Sample N (bptl PP !sf! 'tq~ dU' , , ...1.....-.. ____.______..__ ___. '- MA TERrAL DESCRIPTION Grd' -):l' SAND ~) T:1fl e'l"? SAN 'sp ! (I r ":1 DEPTH 150 Feet BaTing was c1r Ii/eef cfry 10 tile termrnal/of) lepth Graur!(lwater was encc:untered at a lepth at j 0 fo(:,1 during drilling and sampling ;roundvnler ;" 10 2 " feet after 10 !1Inul" s k.~ KL!:iNFI.! DII: Boring Number Date: September 29, 2003 B-25 Type: 2" ODe SPT -200 % I UDW Qu PI I (pef) (Isf) ---+----- 4 23 3 I Addendum NO.3 Attachment No. 1 38 of 44 HI Pn>,jcd Locat io II. Lat II.ong: L()(~ OF BORIN(; '~CUI'1";1( e \jalEc,f i I ansr'WiSlon Main PhdS8S 4,4;.\, & 5 ':( rpLS ~hr sll. NUEce~ ,ounty r exas I J ," ~7'l1 'vV S1/ F)' 5 sr' Depth Pp Feet SymbOl Sample N (bpI! Isf) ~-. L . I' ,'Ii ;:,-lgI11 . '" l,j, I; :1 MATERIAL DESCRIPTION Gr d" arc T,r SL\ND wI'll shel! [F ILL 1 T;:1 n ~~)\: J y T d["1 rid lyey SI! T T ClI lif> j (;r. 'J\~,J D COiO' C '1-1 r ~(l (? <. . ( \ ra n ;~ .'-ld C.lf"(] '." colof C~-l lflqt?; tdn 'il! fJEPTH 150 Feet 'lOI/lJl] "'idS :illl/l'U dry to the terlnlnatlOn !epth G/Jundwater was encountered at a lepthJf. 5 10"/ dunng dnlling and sampllnCJ fnd die! n)1 :/')! liter 10 minutes Me " ,. I (~j 26 4 I I i (Mq SP I I I I 19 NIKLLINffl DII( Boring Number 8-26 Date: September 2!j, 2003 Type: 2" 00. SPT 19 5 I i I I I I I L Addendum NO.3 Attachment No. 1 Page 39 of 44 r[~:;)th ~.. f' f't i RI L()(; OF BORING Projl'd. 3cutflsltle '.Vater Ti ansrn!,;Slon 1\:1a1f1 Phases 4 Local ion' 'd:( lrpus ,~h! ist!. Nueces C1lunty, T E,xas Lat / Long: ;~.)' 37' 32 C", I;V 97 18' 48 ()" SymbOl Sample ~,(bpt) ') T ~ I I 1 :0 pp tsf) MATERIAL DESCRIPTION Tar '3nd O;lrk Cray Flrll' SAND With slit -COier cunq( to tan ane 11 reddlsil,tan COlD! LJnq(~) tall ; 5' T ;lC Sll'i SI\N II -colc)r ci'clrHJc,> to tan dl1(llt feddlst' yello\'. 5' Tar'rallc'llt CJ SANO ,1, col( Jf cJ -3nqp) tu Uln 1~ COI()r {' I it ~Ird\ colol Cndn~je:'( tan 3[1(j ,t qcay -~~~--~,- , .::.'..f i['yflght 20i :elli" 'I TOTA! DEPTH 1') () Feet f30nng ,vas (im/OIf dry to tlw temJlflatlOn fepth GfOuflcJwater was t:?ncountered at a Jepth 01 J 5 Ie!?! dUring cin/ling and sampfmq . ;roundwater {J 'ji: to 3 () feet nfter 1 () ninutes i _u_~ ______._____ Lfl hLll.'-JfllDER Boring Number B-27 AA, & 5 Date: September 30, 2003 Type: 2" 00, SPT Me -200 UDW Qu " % (pet) (Isf) " II PI -! ~122 (SF' ~ I I 1B {sry~J 16 f3 (SP Addendum No.3 Attachment No.1 Page 40 of 44 III L()(; OF BORIN(; Project: Suuthsli:e Vater T I ,mSnlISSIOn Main Phases 4 4A, & 5 Location: (~crpLS :hrlstl, NUt'Ct?S Dunty Tex;ls Laf! long: N ;'. ;7' ,)0 8", VI q7 1R' 26 Depth: Symbol rcp! , ,i pp ~;,Hnple N (bpI>, I!sf) :11 I ~, 211 r"irlgh' 20i K "-I(j, ~ " .--+---..,- MATERIAL DESCRIPTION -. T2 Fir'" SiVJI) with SDrj'(, rlav w'lh sere",!' cola' e'l n(w~ tan and ;t qrecnlstl-gray TOT/II OEPTi-l 1 0 Fee! f30nng Wd:; Olllled dry to tile termination fepth G!Ju[icNvater was encountereci at a fepth of J 0 lel?l during dnl/ing and sampilm} 'Jrol1ncfwlte! ! .1';-! to 3 5 feet after 10 nrnut,:s 'f SP k.~ K L f i ~" f [ l D l:: I~ Boring Number B-28 Date: September 30, 2003 Type: 2" 0 D, SPT Me -200 I UDW Qu % J.:l:_t-r>I- (pef) (tsf) I 'f, 12 5 20 2', ,+ Addendum NO.3 Attachment No. 1 Page 41 of 44 III Projed Local iOIl. Lat / I,ong: L()(; OF B()RIN(; ':)Cu!tlSlde Vater -; dn ~r"lssion ~1ClIIl Ph;lses 44A.. & 5 C( lrpus (~h Istl, NUf'(;e~; unty f E~XdS r~ ~ T 1 2 ()", VV CJ 7 1 El' 8 Cj" r;):~:rl' rpo:;1 I Symboi Sample N (bpI) " ~ __!J!... i"i '/0j;zr ' ,>~~<;:; ?y: ~ "'" / "'>/7h//'/. /;. L) V/g~'" " ;5~/ - -.-.... -~_.--r" --~~ )iJ',nghi 2c. pp tst) MA TERrAL DESCRIPTION Oell ~ c; f;Jn F"If' SAi'-JD J ~' Tan ane! C~rc(' " sh-GI'av SAND 01 OEP7H 7;JOh'el Bonn~J \V]) lin'/u;j dry t,) Ow tClnllnatlon .iepth GTulicJwaler was encountered at cl :ieptll 0' -4 0 feet ;luTlng drilling and samp/m{) 3round,\ ,,:ter to 3 5 f,?et after 1 () "ninu!e,5: :SPl SC "f k.~ h l f i '"J F F I D ! R Boring Number Date: October 1, 2003 B-29 Type: 2" 00, SPT Me I -200 OiQ i Q/o LL 21 4 16 Addendum NO.3 Attachment No. 1 Page 42 of 44 III Projecl Location: Lat 1,lIng: I ,()(; OF BORINC; S()U'[iSlie VCttt, T 'W~, ilSSlon Main Ph(]~;es 4"lA, & 5 C)rpus Crlstl. i~u;C:tS :':iJunty Tf?:X::<1S \j ,'7 3 7 3 1;\; " 5 1 Depttl ! S b I . S' I PP Feet . yrn () i . amp e "(tJpf)tsfi P--Z~"~~' f V/'// J ~j .it _....r I... ~ ~II.~~/...r. If f~;\. ;~:;8~ ' . 0>:;/' :;~~/ ,II [~~//// -----..~/ // (;a;';~ . ;~.'/'.' (~iifj ~~~: / /://> , '.~/@'$.}.'".. ~ffi': 15~;______ ~~!- ~> ;y n , < pvrrgt,r 2!l' ~. -...del;_" MA TERrAL DESCRIPTION C;r;;'/ lIt j if'\! SAND .1 ~J rJ,3lk l'l Sandv ('[ /l.,'" 'N'tn ',;In(j le:-~:~)~'; ('. Dra> c:'-ic1 Lif 1,-1)1,;, Di:'k, (;"1', '; ;Iaye,/sr.ND Cl) ,)r (em dfid it lid'! wit' shei's J ~ 11 J :, Greerlis'IC;r d ind Tail Silty etA Y '1 f)EPTH '" 0 F'eel Sonng \\;)s ,in/Ie"j dry tu the "'fIlI/ndtlOn jepr/] Groundwdter was encountcrec1 at a jeptfJ of 4 0 feel during cinlling and sCJmplinq i?roundvva/er f /0 3 q feel '/f!er 1 () ninutl},' lS9 y I I (Sd I I 31 CL k~ KlUNHII)[E. Boring Number B-30 Date: October 1, 2003 Type: 2" 0.0, SPT Me i 0/0 20 25 I i i I I ! i I I ! I I 25 19 32 18 Addendum No.3 Attachment No. 1 Page 43 of 44 k.-.=J KLEINFfLDER \PPLlC:\TION FOR AlTHORIZATION TO USE ",utih d,' l\1alJ1 IranSIllISS!O!1 LlIle '!lases 4, 4a, and" I I JrpllS ('hflSIL rcxas ('I' ot ('H!,US t hi!'!l Project NIl x:l9(). 842" and 8391 <cport ollgmall\ prepared lor: City of Corpus Christi Flie Numhcr 26927/CCH4001 Report Date: January 7, 2004 Kleinfelder '>002 Ambassador Ro\\ C'orpus Chnstt, Texas -'''14 (, '61.85447'4 (voIce) ~6L854H,'4 (fa\) i'o Whom II Ma\ Concnn \pphcan! understands and aglles thet: the cll,o\ " refcrellu:d report ftH the subject site IS a copynghted document, Ihat Klelllfelder, inc is the .op,Tlght O\\lTr dt1-) that unauthorl/cd use or copYing of the report for the subject site is ,tnetly proJllhltcd A IthdLlI th, expl:" Wi! tk:] penms,.;tOll of K krnfcldcl Inc. Applicant understands that KleinfeJdt'L Inc may \\lthho], sllch P,'llllh,llIlI ,It Its..;olc discretIon, or gIant permission upon sllch terms and 'HldltlOl1, d. It deems ,Il' "Tlah By signing tJeloVl, the Relying Parties agree to the same terms and conditions as KJeinfelder's original client, including any limitations of liability or indemnity obligations. The original services agreement may be obtained from the original client identified ahoH or from Kleinfelder. upon request. To be Completed by Applicant By (Print Name) (company name) (address) (Signature) Title: (cirl', state ZZP! Date: C~ (teleeh~')!}. ~~" (FAX; To be Completed by KIeinfelder, Inc. ____Approved for reUSe with applicant aglt':cmg to above terms and concurrence by original chent Additional fees are estimated at $, ____DIsapproved, report nerds to be updated By. Date: Klemfelder, Inc .- RETURN COMPlETED FORM TO KLEINFELDER Addendum No, 3 Attachment No. 1 Page 44 of 44 ")927/CCi 14ROO I tl1....ngh! 2(); ~_ "', k!rll '-d~ ~i0992/CCH4R054 'opyright ;004 Kleinfece ...q KLEINFElDLR APPENDIX Addendum No.3 Attachment No. 2 Page 1 of 9 December 8,2004 L____ k~ KlEINFELDER \)' ~- i~ ~" ~' ,(; -' '" "011" ) &c '. "co'I) ":)Ito> L \c. -if.! ~r "0. 6'u. . .. ~...rl ' ~I9L,.' ,1" . <7 ,% c: ~ '0 *" .<.; 3:-0 Q ~ .(2) e (2)~ (!j: o .~ .(; cQ- ~ ,10 -'1Q'6; "'/Q,(, '1(;11: '>~~:.::: !il > ro Z c o U (ij s: <P 0- -S Q.'b ,,0 !1i g- et ~ U'i o q: ~ ~~ ~ Q-- I / ., /.9 :s:- ,:tfj ~I;:' ~0. ...;9 ~/.n . /~ <:T -I1?O~o 7", "'I. o S0/& -/I"~ cr.,y C d L c o If) If) c5 CLlf) OJ X .5 E:: +" QJ :-;-= lfl =s I~ C 0 ->-., d ~ .U ~ OJ - - L 0:-':: c ,-- - - - ,,) ~ In > OJ +-> OJ GJ d If) +> :3 d -~ (/) OJCl. <:) -- If) -C +-> =s 0 (/) +-> ~--~ _~ OJ c+> -.C d U _J Q If) ::3 Q. C o U Addendum No. 3 Attachment No. 2 Page 2 of9 .. i - f J j J J ~ t t .~ ~ J I ;;Q ~ ~ iZ<' ~I $.~. cn- ....:l~ p.,U uO ....:l k;CO t, .-::. - E-< .Q ~ ). ~ ~ ~ ~ ..........'''~ -l I >~" C d L C o C -In 1fI d d cL - lJ) ClJ X E -P ClJ lJ)::::51- CeO :1 _0 d ~.~rl +.> ~ Qj -P l..u ~ f- 0::' 1fI U -- CJ ~ .' O~Lnl~ I -.J CLi ( ,) '--J ~~ +> ClJ C1 :1 en d Ln 1fI _~:3 d ::::5 s.. l Q C) CLi u. ~ ~O 0 lJ) U -.C +> ::::5 o C/) Addendum No 3 Attachment Nu 2 I Page 3 of 9---1 F10ring No. k.~ KUINFELDER Souths ide Water Transmission Main Phase 5 Reroute Corpus Christi, Texas Summary of Laboratory Tests Results Sample Depth (ft) MC -200 0 pH SBR Chloride Sulfate Sulfide '% ohm-em mg/kg mg/kg mg/kg ~._._._.._-~- --_._~~-~ l 14 <10 <50 745 1CJ16 2 0 8 13 262 ") 47C 36 70 o 31 3 ' ) :l ') [) . .1 ()' l')' ~. , c - 10 ",' 1, "i' - 15 0 ~ ) 32 5 " 3 i I' 4" ; ) t; 7 ' ' 9 '0-' j3 '; -) ( d :)' _ i) (' 828 2'78 f ~' :~ i. ' '- q (' 90 107 60 - '5 lJ' ./'1 ~H) Addendum No. 3 Attachment NO.2 Page 4 of 9 ',,1', :noisturc~o"tent (-,200 peru'ilt passlrlq #200 ';i8ve, SBR Soil Box Resistivity PLATE 3 TTF17T '---"~-7:r ~7?l :E-- r--.... ~. iiE~- k-- k---- I ~-_. I' [<-- r=- i<(-.. - Tff.ftT f~- K::"'_" I L.._~__,___ , i--. ' . I " .\j: 'f'" r f . :., I I 1 J -~ j .J I i i I i .; , J i j J -1 I rerd 1 h .____ n~ ///=/// !--1 I .L ure, psf ,1 ' Cjht ()f [x;CcJV,:ltl(Y. ft. Apparent Earth Pressure Southside Water Transmission Main Phase 5 Reroute Corpus Christi, Texas PLATE 4 k.~ KLEINFELDER Addendum NO.3 Attachment No. 2 Page 50f9 "'<.ifh kq KLEINFElDER EXPLANATION OF SYMBOLS AND TERMS USED ON LOGS OF BORING rn) S3fT" e r" ! bp' i (~~, LL .1~ T t:~! DE S<_:~.~IPT!( ''J Me UDW Qu (psf) (tsf) .200 % "; /0 F'I Un,j,sturllpd [H, sl; lube sdll1plF P':ket Penlromet." I esl -i , s 1 35 I i 10 ',ee symbols he lOW disturlJeC samr,J.. Spiit Spoon sample and Standard Pe1etralion 1 est Blo;\l Count 'f water surface TYPICAL SOIL SYMBOLS - ~J [IIIllll]] -~~] ['~-3 L"ar Clay (C L i LJ C~] L.J ~~_:~"i~ --.. -. t__~~- Well-Graded Gravel ',GW) Poorly-Graded Sand (SP) Fit .iayICf~) Well-Graded Sand (SW) Si' (\11 ) Poorly-Graded Gravel (GP) E,astic Silt (MH Silly ';aml (SM) ~j'%;!:J~~ '~'-";"':/'J'r;:. '. r~'"\,/"_ -, >~ p8 1~~.J Silty Gravel (GM) Clayey Gravel (GC) Clay"V Sand (SC C;1!r...dreous SOIL STRUCTURE N Btows per toot Si:ckensided F issdred L Y1H1ated Inlerbedded Relative Density of Cohesion less Soils .ontarning calcium I arbonate Relative Density he presence of planes of weakness Ldvrng a slick and gli)ssy appearanu' Very Loose 0-4 4 - 10 1 0 - 30 30 - 50 loose 8reaks along definitf; planes of fracture ",,'Ih little resistance With fracturing Medium Dense I\:ternating thin Idyer', or lenses of v drying mater!al ur color Dense Very Dense Over 50 Alternating layers of'arylng material Relative Consistency of Cohesive Soils Descriptive Term Uncon. Compr. Test (tst) Very Soft Soft Less than 0.25 0.25 - 0.50 0.50 - 1.00 1.00 - 200 2.00 - 4.00 Medium Stiff Addendum NO.3 Attachment No.2 Page 6 of9 Stiff 'very Stiff Hard More than 4.00 Tt of BOring 3epr-escntatiol' UF" ';ur:<urface rnatenafs ~-it It!,;: specific [)(JrIOQ ioeatlon IIV1thm the death explore:J The transition betv..-'een strata may be ,narena.. type a';') -:ie; Ihs bet~~eer co,.-,: c; be exf.-Y' led_ v'Vaterre.'e' (}b3;.~f"/GJf,':)ns represent those conditions at the time of tne 5tC ano mel :'-./tfh flfT.? an: III Proju.'t Loca r 10 [J (;PS ( 'ponl l('i')!n Syrnb,' '~dmpll,' N (t)pf) L()(~ ()F BORIN(; ~)l ,j't SI je Vate! T ,ms "1:3Slon ) r p \ j:-:- 1.,; r j s tIT e ): d S ) 1 l' "Ni9' H'4' Ii r.1alf Phase 5 Rt~route k.~ KlEINFIIDEI< Boring ;'I;umber BJ1 DP :tsf! MATERIAL DESCRIPTION Date: November 9, 2004 Type: 2" 00 SPT PI UOW (pel) Ll'" F.' ,. c.;A~Jr LL ;>1 3 yl ~ ~,...- U 24 · I I I 1-1 21 I-I i -J I ! I /4 22 2 --~ cole: ChiH'qC" tJ tan ,'j. iCJht qreerllstl'gray NI[il Silt -'yrHJ..,1 (': If r DEP If, 1 0 Feet Bonng VI/JS dclvanced Jr.v to the terrmnatlor depth Crounclwater was encountered dunng dnllmg and sampling at a depth of 3 0 feet Water level VdS at a denth of 25 feAt after 21 'Ie if' 5 23 6 SP Addendum No.3 Attachment No. 2 Page 7 of 9 III KlEI",ffLf)[I{ RI L()(; OF BORINf; ~ ~ . fkring !' ,qnher B 32 Projt:d Location GPS I 'nord )c urt'slile Valel T imSI1'J';Slon Jlf'ijS ,:h Istl fe>as '~~t ~ '5il 'IN /Sl ~-1 HI2 (3 '\/'J M;:lIfl Phase S Peroule Date: Novr:::'lber 9,2004 Type: 2" C D SPT "0 " /0 "I, UOW Qu (P~f)j (tsf) I Syrnb, amp!I' ~-~ t.l)') ,'P l';t; MA TERJAL DESCRIPTION Me ~200 ITS. 'i I lie; S/\N[' ( J cd 111::1,"', ru tar: 22 'f 2] 5 ~ 21 n 2 ., ' '., DEP7 Ii 1:,0' el-'t , I I I (SP~ I i i BOrin] VI as JU, anced dry to the termrnatror depth Crounclwater was encountered dUfll'g dol/mCj arid samplmg at a depth of 4 0 feet Water level wa', at a depth of 3 0 feet after 22 nour' Addendum No.3 Attachment No. 2 Page 8 of9 'I) ,;Jyr"Jhl .;!)({ 10 Pr'oJl" -{ LOfJtlO1l (;PS ( oord r' d!_'" Symbol L()(; ()F B()RIN( ~ ,;,~ litrh I Je)ater ! ZHl ~r"I",Slon Main Ph15t~ 5 F-<'" iJute .llrr>.iS :t, 'stl T exdS " - )14 'NiY7 :3' \V Pp Isf) ~),Hnplp N' hpI) Browr I !1i- (/IhJD Wltll ,~i3" ~- ~ ~ ~:'I~: }I/:~: '/ ,1/ . .///, ///- /<>, ~*<~j .' /~>// .. / / ///~ 1..:/ ////. /'~//1 ':;/:1:~i ". :<<;~.' <:--://0 ////) .' / -- ~ ,",'~;-j>~<'~ /:;:: .~ < ///-//1 'X //~ '.';;/--: / ;;;-;.~ "/~.i'/~ /.f........~.~;:...Z.:./ ./:(@- .:/;~~ .....~.../.%~ j';~~/ ! -----L- .Jh' MATERIAL DESCRIPTION L3r',~r:'c..... brD\~..-,;': 8. ~d ':.1 :2n~_;t~-~ i .fCVl c)x:(~(, :;'dr' OIONr. \jI-'enlc,~ Fax;:' I~,. ra":, ",.''!'I :;raV Ciliey S,c.,NU ~3 r ',; ~ i tan ,,\In -):X,i,jt-.;tc-lir CUiCH ctLVlq~~"-, tan & iiUilt qray i) "arl g Light (~r->;lllsh.G"af') .anrJ 8, 9 .ps! If' if' POSits Cl t Nlth CL~ I lEPTii 7"-. ree' '10rl'79 Wo" cLi, ,,(Iced dry in tIle terrTlilJdtlOI lepth Gr}UIi'jwdter was encountered dun(lcj inlllng anj sdmplmg at a dept/7 of 6 5 feet Vater lev~:! ltCt J' a deoth of 5 0 feet after ?O ours k~ KLEINFFLDER Boring "\Iumher Datt': November 9. 2004 BJ3 I'ype: 2" 0 0 SPT Me -200 I rw Qu " % I PI . (pef) (tsf) LL ' - -+ I 13 12 23 ;; 1 ? 1 H L I I 28 i I 90 i , . I H I i i I I I I I Addendum No, 3 Attachment No, 2 Page 9 of 9 1 ' Ub c:54PMj Page I! 1 Jl I\' .~ Cily of .. Q>ipus ~ = Chnsti I ADDENDUM NO.2 f ~~ January 24, 2006 TO: ALL PROSPECTIVE BIDDERS SUBJECT: SOUTHStDE WATER TRANSMISSION MAIN PHASE 5 PROJECT NO. 8391 Prospective bidders are hereby notified of the following modifications to the contract documents, These modifications shall become a part of the contract documents. All provisions of the contract documents not specifically affected by the Addenda shall remain unchanged. I. PART A - SPECIAL PROVISIONS PARAGRAPH A-i. TIME AND PLACE OF RECEMNG PROPOSALS I PRE-BID MEETING AND NOTICE TO BIDDERS BID DATE CI1ANGE Prospective Bkiders are hereby advised that the scheduled Bid Opening date has been postponed one week. fi:Qm January 25, 2006 at 2:00 p.m., to W8dnasdav. Februarv 1. 2006.12:00 D.m. Location and Time of Bidding shall remain unchanged. NOTE: Addendum No. 3 will follow shortly to provide additional clarifications and Geotechnical Reports. Please acknowledge receIpt of this addendum in the appropriate place in your REVISED PROPOSAL FORM. END OF ADDENDUM #2 I ARE/co Ellgirtteting ServIce:; POBox 9277 · Corpus Christi. Texas 78469-9277 · (361) RS(),3500 ~~ ADDENDUM NO. 2 Page 1 ofl il elt 8:06PM; Page 1 '42 ~ ILe FAX TRANSMISSION Department of Engineering Services M~jor Projects Division City of Corpus Christi P.O. Box 9277 Corpus Christi, Texas 78469-9277 Phone: 880-3527 Fax: 880-3501 To: ALL PLAN HOLDERS Date: January 20, 2006 r '. .. J/I'-P /) 'ag~: 42 (including cover sheet) FrOIO: Angel R. Escobar, P.E. '^ ~,t-/ Director of Engineering Se Subject: Sou.thside Water Transmission Main Phase 5 Project No. 8391 Addendum No.1 Comments; This fax transmission contains the signed. sealed addendwn from Urban Engineering, Inc. The addendum modifies the Special Provisions, Standard Specifications, Tecl:urical Specifications, Appendix C, Drawings, Agreement, provides a REVISED Proposal Form. and provides clarifications. Prospeetive bidders ace bereby notified of the foUowing modifications to the (ootract dOCUDleBts. These modlficatioDs sball become a part of the contract documents. All provisions of the eontcact documents not speclfJeally affected by the Addenda shaD remain uB~banged. >j" ~ d ~~~< 06 8:06PM; Page 2/42 , City of Qtpus _ = Chnsti ~~ l ADDENDUM NO. 1 January 19, 2006 TO: AlL PROSPECTIVE BIDDERS SUBJECT: Souths.. Water TraMmiuion Main Pha.e 5 Project No. 8391 Prospective bidders are hereby notltled of the following modifications to the contrad document8, These ITlO<Ific8tions shal become a part of the contrac:t doCuments. The provisions of the contract documents not speclflcally affected by the Addendum will I'8main unchanged. I. PART A - SPECIAL~SIONS A. A-4I1E~ OF AlJN!O see Page 4 of 32, Item 8 DELETE 8. Provide all equipment and labor nec:essary to install 42" diameter water main by standard marine construction techniques under the Cayo del Oso from Station 75+38 to station 100+15 89 shown on the plans. a. Provide all equipment and labor ......IJ to instill 42" dlemeter WIIter main by standllrd marine construction techniques under the c.yo de. OSO from smtfon 75+38 to Station 101+40 as shown on the p.M. ADO: See Page 5 of 32, Item 8 ADD: New Item s. Dew....na _ ...ded to kMD the excavation drY .. aDDI'OWld IN .. En,..l- 8r............ Include an ~ " grov.... . cIN founcl.tton for the DfODOlld fm~"'" iIlcludina .....inG a~ I~"ina the aeotlextIle .... CIU...... ...... Adclendum No, 1 Page 1 of 13 Engllleering Services POBox n77 · Corpu:s Chri:>ti, TeKas 78469-9277 · (361) ~80-350i) ~ -!S ':Jr' ,rj L. ~"C~ 06 8:06PM; Page 3/4~' B. A-6 TIME Qf COMPLETION/LIQUIDATED DAMAGES See page 7 of 32 1 DELETE: The working time for completion of the entire Project will be 220 Calendar Days. ADb: The working tIme for c;ompletion of the entire project will be 300 Calendar Days. 2. DELETE: Phase I - Station 0+09 to Station 106+80 75 Calendar Days Ph.-se II - Station 106+80 to Station 212+63 75 Calendar Days Ph_se 111- Station 212+63 to Station 295+73 60 Calendar Days Phase IV ~ Contract Closure 10 Calendar Days ADD: The Droie<:~ has ~n ~ivlded Into Dhases, The Contractor Is reauJred to comDtete each Dhaae before DroceedIna to any other gh.... No anv one time. exc:,m as noted above. tIMt contractor will not be allowed to start Of work colJcurrentIY In more th~ two Dhases. TIme duration for construcUon Is allocated for each Dhase. and If the WOf'tlln that Dhase Is ~ comD'. as shown below. liauldat8d dam..s will be iISH&.ed for each day the work i. del~~ PhUe I - StatIon 0+09 to Station 106+80 Ph.5e II. Station 106+80 to Station 212+83 Ph..III- Station 212+63 to Station 295+73 Ph.. IV - ContrBc:t Closure 1U Ca'endar Days 75 Calendar Days 60 Calendar Days 10 Calendar Days n of UE 8 n om I n within the == T~:'. and UE. ::ation of casing Dloe bY borIna. h tes na and disinfection. 3. DEkETE: This project is essentially a construction contract for a period of 220 Calendar Days, as detaHed above in these contrad documents. Damages for exceeding the total time allotted shall be independent of damages assessed for each phase, as described above. ADO: This project is "Mntlafly a construction contract for a period of ~ Calendar Days, as detailed above in these contract documents. Damages for exceeding the total time aUotted shall be Independent of damages auessed for each phase, a. described above. Addendum No. 1 Page 2 of 13 !l!r 'rJ .~. . a0_~ 06 8:06PM; Page 4/4;~ C. A-i8 SCHEbulE AND SEQUENCE OF CONSTRUCTION See page 11 of 32 1 DelETE: Phase I - Station 0+09 to Station 106+80 75 Calendar Days Phase" - Station 106+80 to Station 212+63 75 Calendar Days Ph,se 111- Station 212+63 to Station 295+73 60 Calendar Days Phase IV - Contract Closure 10 Calendar Days ADO; The orolect has been divided Into phases. The Contractor Is 'laulred to c::omDlete each Dhase before proceedlna to any other Dhas.. AI. any one timB. exeeDt 18 noted above. the Contractor will not ~ allowed to start or work concurrentlY fn more thfll two ~s.s. TIme duration for construction is aU~ for each Dhase. and If the ~ork In that Qhase Is not como"i. as shown below. Ikwklated damaaes will be assessed for each day the work Is delaved. Phase I - Station 0+09 to Station 108+80 Ph..n. Station 108+80 to stBtIon 212+63 Phase III - station 212+63 to Station 295+73 Phase IV - Contract Closure .1H Catendar Days 75 Calendar Days 80 Calendar Days 10 Calendar Days Do A-51 HAL TIM INF RElAT 0 ACQUISITION IY THE CITY See page 27 of 32 1 DELETE: As noted in Section A-6, the working time for completion of the project shall be in mCalendar Days. ADO: As noted In Section A-6. the working time for comptetlon of the project shall be in 300 Calendar Days. II. PART S - STAHDARA-8PeCIFICATIONS: A. SeCnOH ~20 WELDING DELETE: Section 05020 in its entirety. Addendum No. 1 Page 3 of 13 )1 h',~~ d " ()(j 8: 06PM; Page 5/4~) III. PART T . TECHNICAL SPECIF.CATlO~ A. SECTION 02317 EXCAVATION AND BACKFILL FOR UTILITIES See page 9, Item 3.05 Excavation, J. DELETE. ADD: J. Coordinate excavation within 15 feet of pipeline with company's representative. Support pipeline with methods agreed to by pipeline company's representative. Use small, rubber-tired excavator, such as backhoe. to do expJoratory excavation Bucket that is used to dig in close proximity to pipelines shall not have teeth or shall have guard installed over teeth to approximate bucket without teeth. Excavate by hand within 1 foot of Pipeline Company's pipeline until pipelines have been uncovered and fully exposed. Do not place large excavation and hauNng equipment directly over pipelines unless approved by Pipeline Company's representative. J. CoordJnata excavation within 15 feet of pipeline with company's representative. Perform exc:avatJJm within 15 '.t of ~Iine In Dl'8Hnce of DIDeUne comoanv*s r~dlatlve. Support pipeline with methods agreed to by pfpellne company's representative. Use small. rubber. tired excavator, such as backhoe, to do exploratory excavation. Bucket that is used to dig in close proximity to pipelines shall not have teeth or shan have guard installed over teeth to approximate bucket without teeth. Excavate by hand within 1 foot of PlpeHne Company's pipeline. Do not 11M laraer excavation ~ufpment than norrgaltv used to dIG tren~ In vicinity of DiDellne until pipelines have been uncovered and fuUy exposed. Do not place large excavation and hauling equipment directly over pipelines unless approved by Pipeline Companyts representative. Addendum No. 1 Page 4 of 13 B. SECTION 02501 DUCTILE .RON PIPE AND FITTINGS See page 7, item 303 RESTRAINED PIPE REQUIREMENTS 1 DELETE: (Table) r From I r Station ~ Station I 0+09 2+60 39+50 41+50 i 52+00 55+45 I 57+50 61 +00 71+~ 107+31 i 111+77 115+09 117+00 121+00 158+50 160+50 198+00 200+00 211+50 213+76 219+00 221+50 237+17 239+53 269+98 274+13 276+83 280+49 I 288+37 295+73 't 8 U7PMj Page 6/42 ADD: (Table) , From To StatIon Station I ~0+09 2+60 I 39+50 41"'50 52+00 55+4S 57+50 61+00 l1.:!:I2 l.t!:H 101+40 107+31 111+77 115+09 117+00 121+00 158+50 160+50 198+00 200+00 211+50 213+78 219+00 221+50 237+17 23&+53 269+98 274+13 276+83 280+49 288+37 29$+73 -..-- Addendum No. 1 Page 5 of 13 Arl1A' ;i', Db 8:07PM; Page 7/42 ,= ,'" 2. DSlETE: Note ABOVE TABLE SHOWS LOCATIONS ONLY WHERE CALCULATED RESTRAINT> 20' ADD: Note:.ll ABOVE TABLE SHOWS LOCATIONS ONLY WHERE CALCULATED RESTRAINT> 20' 2J FROM STATION 75+38 TO STATION 101+40 IS WELDED STEEL PIPE. C. SECTION 02511 WATER LINES See page 10, Item 3.06 Joints and Jointing, C. 3. DELETE: 3. ADD: Joints: AWWA C 206. Full-fillet, single lap-welded slip~ type either inside or outside, or double butt-welded type; use automatic or hand welders; completely penetrate deposited metal with base metal; use filler metal compatible with base metal; keep InsIde of fittings and joints free from globules of weld metal which would restrict flow or become loose. Do not use mitered joints. For interior welded joJnts, complete backfiUing before welding. For exterior field-welded joints, provide eighteen (18) inches working room under and beside pipe Use exterior welds for 30-inch and smaller. 3. AWNA C 206. Full-fillet, slngl. lap-wefded slip-type either Inside or outside, or doubl. butt...,ded type; use hand welders; completely penetrate deposited metal with base metal; use finer metal compatible with base metal; keep inside of fittings and joints free from globules of weld metal which would restrict flow or become loose. Do not use mttered Joints. For Interior welded joints, complete backfilling before welding. For exterior fletd-welded joints, provide eighteen (18) Inches working room under and beside pipe. Use exterior welds for 30- inch and small.r. Addendum No. 1 Page 6 of 13 -1: Ji) 8.07PM; Page 8/42 o SECTION 2813 BAR WRAPPED STEEL CYLINDER PI~ See page 17. Item 3.06 RESTRAINED PIPE REQUIREMENTS DELETE: (Table) -~~i~n- St;~~~ i ~09 1+98 I 39+50 41+50 I I 52+00 55+40 i 57+50 61+00 I I I 74+18 106+00 ~ 111+90 114+98 i I 121+00 117+00 I 158+50 160+20 198+00 200+00 I 211+57 213+69 I 219+00 221+50 237+29 239+41 269+94 274+17 276+95 280+43 293+10 295+73 _._--_._-~ ADO: (Table) From To Station Station 0+09 1+98 39+50 41+50 I 52+00 55+40 I 57+50 61+00 74+1! 75+~8 101+40 108+00 111+90 114+98 117+00 121+00 158+50 160+20 188+00 20G-tOO 211+57 213+89 I 219+00 221+50 237+29 239+41 r 2....94 274+17 276+85 293+10 280+43 295+73 Addendum No. 1 Page 7 of 13 ::~ tH-i ~,j a1~~ 06 8:07PM; Page 9/4~' 2 DElETE: Note: ABOVE TABLE SHOWS LOCATIONS ONLY WHERE CALCULATED RESTRAINT> 20' ADD: Note: 11 ABOVE TABLE SHOWS LOCATIONS ONLY WHERE CALCULATED RESTRAINT> 20' 2) FROM ST~TI()N 75+38 TO STAnON 101+40 Jl WELDED STEEL PIPE. E. NEW SeCTION .20 WELDING: ADD: N.., Technical SDeclflcatlon ~n 05020 1$ Der Attachment No.1 III. APPENDIX C DELETE: Entire 5*81 Provisions and Contractor Obliaations Reoort ADD: REVlSEQI ~aI Provisions and ~ntractor ObliGations ~,~rtn as Der Attachmtnt No.2. IV. DRAWINGS: A.. SHEET 4 OF 41~i \'M.!iR MAIN PLAN & PROFILE BASELINE STA. 1+74 THRU 11 +50 (PLAN AND PROFILE) 1. DELETE: M Release Valve at Station 1 +88. 2. ADD: IV. St.lon 8+75: "Underaround seconda.:y c,"" crotising" B. SHEET 5 OF "1~ WATER MAIN PLAN & PROFILE BAlELlNE STA. 11+50 THRU 23+50 (PLAN VI W) 1. ADD: IV. Station 12+60: "Underaround Drimarv cable crossina" 2. ADD: At Station 12+60: "UnderGroUnd secondary cable croqino" 3. ADD: At Station 14+12: "Underaround secondary YI!I! crossing" C. SHEET 8 OF 41i:tTER MAIN PLAN & PROFILE ~UNE STA. 23+50 IHRU M:!:.& (PLAN VI 1. ADD: At Statton 25+08: "Undelllt"~nd HCOndarv cable crosslna" 2. ADO: At. station 26+93: "Overhead line crossing" Addendum No. 1 Page 8 of 13 d ~.~t1 .lt1U~.: elil ~, 06 8:07PM; Page 10/42 O. SHEET 7 OF 41~ WATER MAIN PLAN & PROFILE BASELINE STA. 35+50 THRU 47+50 (PlAN AND PROFILE VIEW) 1, Delete: Air Release Valve at Station 41+50. E. SHEET 08 OF 41.'fATER MAIN PLAN AND PROFILE BASELINE STA. 47+50 THRU 59+50 (PlAN VIEW) 1 NOTES: ADD: New Note: 6. No construction actMtv allow~ ~..n malion 57+30 Ind 60+30. 2. DELETE Between Station 57+30 to Station 59+50 195 LF ADD: Between Statton 57+30 to Station 59+50 2m LF F. SHEET 10 OF 41.WATERMAlN PLAN AND PROfiLE BASELINE STA. 71+50 THRU 83+50 (PROFILE VIEW) BUTT WELDED STEEL PIPE, PER TECH. SPEC. 02518 (WT. O. 70") COATED W/POL YURETHANE PER TECH. SPEC. 02527. WELDED STEEL PIPE. PER TECH. SPEC. 02518 (WT. 0.70.' COATED W/POLYURETHANE PER TECH. SPEC. 02527. G. SHEET 11 Of 41. W~tER MAIN PLAN AND PROFILE BASELINE STA. 83+50 THRU I.t!:H (PROFILi VIEW) DELETE: Note: ADO: Note: 1. DELETE: Note: ADD: Note: CONTRACTOR TO RESTORE CHANNEL BOTTOM TO EXISTING CONDITION i.BETWEEN STATION 10+00 TO STATION 90+00. THE CONTRACTOR SHALL EXCAV"TE IY OPEN CUT METt1~DS TO TI;IE. DEPTH SHOWN ON THE PU\NS.. ~CE T!fE "PE IN THE ~c;AYATED TRE~CH 9N UND~"ED SOl~ BACKFILL WITHIN srrv ~TE{UAL (18" ~OVE THE EXlS11NG 0RAQEl. C~PACT TW; BACKFILL TO ELIMINATE V9ID~ SURROUNDING THE PlPE. AND SU8SEQyEtm"( REfrORE. THE. <;HANNEL JOTTOM 10. THE ORiGINAl CONOITION AND CRQSS ~ION. P6RGE$ SHALL BE DePLOYED FOR WORK WITHIN 'tHE WATER COURSE TO AVOID UNNECESSARY DISTURBANCE OF THE AQUAnC SITE. Addendum No. 1 Page 9 of 13 2. DELETE Note: ADO: Note: '1'< H1 1 I (~It 8; 08PM; Page 11/42 2. The Contractor sball ,ubmit the mODOsed construction methods at a minimum ~ 30 daYS prior to beGlnnina excavation In the identified area. follow the sD8clal construction notes shown on this drawing and the reauJrements of the USACE permit in ADDendix B of the S~lfications. BUTT WELDED STEEL PIPE, PER TECH. SPEC. 02518 (WT. O.70") COATED W/POL YURETHANE PER TECH. SPEC. 02527. WELDED STEEL PIPE. PER TECH. SPEC. 02S18 (WT. 0.70") COATED WIPOl YURETHANE PER TECH. SPEC. 02527. H. S.-r 12 OF 4~. WATER MAIN PLAN AND PROFI~E BASELtNE STA. 95+50 THRU 107+50 (PROfit! VIEW) Station 100+15 End Cayo Del 050 L.S. Item Begin Water Main Unit Price station 101+40 End Cayo DetOso L.S. Item Begin Water Matn Unit Price I. S~ ~ OF 411. WATER MAIN PLAN & PROFILE BASELINE (IA. 191+50 THRU 203+50 (PLAN AND PROFILE VIEW) 1. DELETE ~ Note: ADO: Note: 2. DELETE: Note: ADD: Note: BUTT WELDED STEEL PIPE, PER TECH. SPEC. 02518 (WT. 0.70~) COATED W/POlYURETHANE PER TECH. SPEC. 02527, WELDED STEEL PIPE, PER TECH. SPEC. 02518 (WT. 0.70") COATED WIPOlYURETHANE PER TECH. SPEC. 02527. DELETE: Air Release Va~ at Station 197+00. J. SHEET 22 OF ,,_ ,,~TER MAtN PlAN & PROFILE gASEUNE STA. 212+63 THRU 224+50 (PLAN \flEW) 1. AOD: At Station 220+75: '"Underaround secondary cable crosslna" 2. ADD: At StatIon 224+12: "'Underaround secondary cable croasina" Addendum No. 1 Page 10 of 13 ,"iSt- '1 8h(ljfj1;J , a -23 06 8:08PM; Page 12/42 K. SHEET 28 OF 'i. WA~R MAIN PLAN & PROFILE BASELINE STA. 279+36.30 TH~U 2~1 +50 (PlAN VIEW) ADD: At. the following stations: 281+80, 283+20. 285+33, 287+40, 288+78 and 290+90 "Overhead line crossing" L SHEET 29 OF 4'. WATER MAIN PLAN & PROFILE BASELINE STA. 291+50 THRU 29,...73 (PLAN VIEW) ADD: At the following stations: 292+30 and 293+68 "Overhead line crossing" M. SHEET 30 OF 4~.MSCellANEOUS DETAIL!' DELETE: Current CONTACT LIST FOR EXISTING UTILITY CROSSINGS in its entirety ::-:: ~=CT LIST F9R EXISTING UTILI!! CROSSINGS as __c _Mo.;. N. SH~~ 34 OF 41. . RELEASE VALVES AND DETAILS ADD: Note 2. PROVIDE STEPS ONLY IF NECESSARY TO MEET OSHA REQUIREMENTS. FOR MANHOLES DEEPER THAN 20 FEET, SAFETY CLtMBING RAIL MUST BE PROVIDED (SAF- T -CLIMB OR APPROVED EQUAL). ADD: Note 2. PROVIDE STEPS AS SHOWN IN DETAIL C..a4-34 TO MEET OSHA REQUIReMENTS. FOR MANHOLES DEEPER THAN 20 FEET, SAFETY CLIMBING RAIL MUST BE PROVIDeD (SAF.T -CLIMB OR APPROVED eQUAL). DELETE: O. SHEET 35 OF 4~. BAR WRAPPED STEEL CYUNDER PIPE DETAI~S 1. See Detail C-35-35 DELETE: NOTE: Backer rod as reQuired ADD: NOTE: Backer rod as required for external we'stino. rod size and matfUi@l shan *"' cornaatlble with the steel of the ~er D'O.. as recommended bY- the Dioe mlnufad~rar. . Addendum No. 1 Page 11 of 13 HH: ~j.i > , " ']6 8: 08PM; Page 13/42 2 See Detail 0-35-35 ADD: NlO~: Weld sl.t.e shall match thickness of butt straD an~ carrier DrDe as recommended bv the Di;;; manufacture!: P. SHEET 36 OF 41~ STEEL PIPE QETAlLS 1. See Detan 0-36-36 DELETE: NOTE: 1/4" X 2" BACKING STRAP ADD: NOTE: 1/4" X 2" BACKING STRAP ONLY REQUIRED AI CLOSURE PIECES. ADD: NOTE: Weld size _hat! miltch thlckn.,s of butt strm and carrier DiDe IS recommended by the DIDO manufac:turer. Q. SHEET 31 OF 41. CATHODIC PROTECTION DETAILS FOR TUNNEL OR CASI;Q CROSSING DELETE: ADD: Cyrrent Corrosion Control Test Stations in their entirety. ~sed Corrosion Control Test Stations IlIr Attachment No. >4~:~:' VI. AGREEMENT A DELETE: The Contractor will commence work within ten (10) calendar days from date they receive written work order and will complete same within ~ Calendar Days for the entire project: ADD: The Contractor will commence work within ten (10) calendar days from date they receive written work order and will complete same within 122 Catendar Days for the entire project: B. DELETE: Phase I - S~tion 0+09 to Station 106+80 Phase 1\ - Station 106+80 to Station 212+63 Phase 11I- station 212+63 to Station 295+73 Phase IV -- Contract Closure 75 Calendar Days 75 Calendar Days 60 Calendar Days 10 Calendar Days ADD: Phase I - station 0+09 to Station 108+80 PhllH II - ~ 108+80 to Station 212+63 Phase '11- station 212+83 to Station 29~73 Phase IV - Oontract Closure 155 Calendar Days 75 Calendar Days 60 Calendar DaY5 10 Calendar Days T", followl. .\5. shall not be a~ bv the DI1asJna: ~I~na 0( TCE ::'~~~i:Di:'~:~-:O==':;;~:n~~~~~ in.ud'atIon Of ftiMlina DtDe by borlna. hYdrostatic te~a:anddl.lnfectlon. dendum No.1 Page 12 of 13 'J~ H il; 06 8:08PM; Page 14/42 VII. fROPOSAL The propoaal rom. .... been I'IMHd by amending IIema as described therein. A com.... new Pro,... form Is attached .. AttIchment No. 5 The attIched REVISED Proposal Fo"" s~1I be used for the bid submittal. DELETE: Current frqposaI Form in its entiretv. ADD: RevJaed PNDoaaI Fonn II Der Attacllmen.f~.1 2. VUI. CLARIFICATIONS 1 The Contrabtor wiU be allowed to clear the TCE and UE, wrvey th.e waterline alignment, Tee', and UE, ooncIuct the pre-expIoratory excavations, offload pipe and store lfwlthin the deeignated TeE's or UE along the plpeJine alignment, install calng ~ ~ boring and complete the hydrOstatic testing and disinfection independenl of the phasing. All work must be cornpfeted within .aoo cafender days. 2 Per the Contr8ct Documents. the 66" casing P'Pe is to be bored at onJy one locatiOn. Station 57+30 to Station 80+30. as shown on Sheet 8 of 41. ThIs wortc.ls located in Phase I. The Contractor wII be aNowed to mobfflze the boring Contractor to complete this work independent of the phase in which he is eurrenUy constructing; the pipeline. Aft work must be compieted wfthin ~ calendar days. P....e acknowledge r8lCeipt of this Addendum at the appropriate place In your REVISED P,roposal Form. HMo OF AQDENDUM "p. 1 ATTACHMENTS: ~~)_'tl ?."....... ...lb. \~,~ J*.. ~ "*~ 1...:.,,,......'1.............f.......Jl! P J.~.~~.~~~~m:.} Mark Maroney, .~. ..10 l '''~4..~ .... ~ l:t,"{({~(&~~I., (Cb Attachment 1: Technical Specification SECTION 05020 Attachment 2: REVISED~Spedal Provisions and Contractor Obligations Report Attachment 3: REVISED:ContBct List for Existing Utility Crossings Attachment 4: REVtSEO'Corroslon ControJ Test Stations Table AlKhment 5: REVISEDPTOpOHI Form I ~~1~ 1 ;:. -1>' 111 ~n L~ 06 8:09PM; Page 15/42 -.....~_f SECTION 05020 Wp.lding 1 . ___~~SCRIPTIaN Th.!.>> specihcation, in conjunct~on with the other 5~cifications listed in Section 2 below, shall govern for all welding required to complete the project. in the event of a c~nflict between this specification and other specifications listed he~ein, the .04e stringent requirements ~hall qovern. 2. RELATED SPtCIFlCATION~ (1) 02340 (2) 02342 (3) 02511 (4) 02~8 (5) 02613 3. Boring and Ca~~ng Roadway~ and Ra~lroad9 Open Cutting and Cas~ng Water Llnes Steel PIpe and fittings for Large I'liamet@r Waterlinea Bar-Wrapped Steel Cylinder Fipe WELDERS CERTIFICATIONS FOR ALL. WATER DEPARTMENT PROJECTS (1) All welders shall have to pass a (6Gl-welding test prior to wo~king on City water pipeline projects. (2) The Water QA department will not accept previou$ certifications from the entities or companies. (3) All welders snall be te~t~d in a recognized testing lab acceptable to the Water QA department. (4) AI] welders ~hall be tested and Bhall qualify fOJ all positions and material thickness requjred for the project. (5) Welders with current credentials filed with the Water department will not have to retest. (Current certifications expire if not working on "ater department projects for more than 6 moa.). (6) The Water department shall not cover welder testing cost~, pass or fail. (7) Watoj!~ QA inspe~tor5 shall witness all welding tests. The attending QA inspector ca.n reject any phase of the welder's test. (8) All tack-welde~s shall be certified according to positions and material thickness r@quire..nts fo~ the proje~t. (9) Scheduling of wtlder's t@sts will require a 24-hour notice to the Water QA inspectors for witnessing. (10) All weldin.; test coupons will be kept per Water QA along with a copy of the welding certLfications. (11) Other t8StS may be required to qualify welders for welding on Water c1epartrtlent projects other than pipelines. 05020 Rev 01/J9/06 Page 1 of4 ADDENDUM NO.1 AttaeluMDt No. ] Pqe' 014 t':c ~ Y:i B : 09Prvl j Page 16/42 1. WELDING PROCEDURE SP~CIFICATION (WPS) FARAMETERS 1 All Water department proJelcts aha j 1 be welded using F3 and F4 class ..lectrodes (2: All Wate;r department project5 shaL. be welded using 1/8" and/or 5/32" electrodes. f 3) All Water department pro)@cts using F4 class electrod""$ shall us~ the v@rtical uphill welding direction of travel. (4) All Water department projects using F3 class @lectrodes shall use ~ertic~l ~phill or downhill direction of travel accordinq to KPS submittals and approval of Water QA department. (5) All Water department proj@cts shall follow manufacturers recommended amperage rangts for electrode type and size. 5. MINI~FIELD WELOING REQUIREMENTS (1) All welders a.Le required to !'lave a rod oven in working condition for storage of low-hydrogen electrodes. (2) All el$ctrode~ of the low-hydrogen type ~hall have Ii ~ximum field life of 96 hours. Thi5 allows two bakes after opening new cans. (3) All electrodes rejected by the Wa.....r QA inspectOJ:'$ will not .be used on the project. (4) All weldin9 ~chlnea will pull sufficient amperage tor the electrode size and type with a minimulll 30% amperage loss. (5) Welding clearance shall be a minimum of law for full circumference. (6) All wel.ding sites or bell holes shall be tree from water <tnd safely accessible to welding inspectors. (7) All OSHA shoeing & safety rules will apply for QA inspectors access. (8) Welding shall not be aJlowed in rainy conditions du@ to safety and weld :ntegrity. (9l All weld lOCations shall be wiee buffed Or ground before welding. (10) All specifications will mention Standards and codes for fi~ld welds. (11) All WPB submittals for field welds shall include detailed schematic of welding procesSes. (12) All WPS Submittal$ for field weIde shall be approv8d by AlE before :;Iendi.ng to Kater QA for review. (13) FIeld documentation shall consist of digital photography, camcorder-VHS and daily inspection records by Water QA inspectors. No exceptions. (14) All welding details and schematics for ea.ch welded component shall be submitted to the Water QlI. inspectors prior to project startup. (15) Any changes tofleld welding prOCedUr8$ will require a new wPS and a PQR fr~ the manuf.ctur@r of the welded product/AWS 01.1. (16) Contractore 5h.-11 provide the project inspector with 24 hrs. notice on startup and 9h~down of welding proceBB6B. 05020 Rev 01/19/06 Page 2 of 4 ADDENDlIM NO.1 AtbdI...t No. J hie 2 014 :..~ :c 8: 09PM; Page 17/42 6. _________ WELD INSPECnON MINIMAL REQUlREM1!:NTS il) ~8rtified Weldinq Inspector (CWIl certification 9hall be required of Bub- ~nntraeted weld in~pectors. (2) Oaily calibration of equipment shall be required fOL MT, UT inspectors as required by AWS D1.1. to b€ witnessed per Water QA. (3l Level II certifications shall be required for MT, DPT, RT and UT inspectors as per AWS Dl.~. (4) SuO-contracted. UT inspectors shall be required to submit sch4!!.ll\aties showing location of anomalies on rejected components according to AWS Jl.l., paragraph 6.27.8.1_ (5) Sub-contracted aNI inspectors shall keep a daily record of welders and their weld location~ as per AWS D1.1. (6) Sub-contracted inspectors shall follow all of thei~ company safety rules and wear safety equipment while workinq on Water d8pa~tment projectB. (7) NDE inspection GQnlpanies will furnish inspection procedures according to AWS 6.27.1. (8) All weld ins~~tionB and w@ld repairs will be conducted usinq designated standard$ as per AWWA, and AHS D1.1 welding code. City Engineers will determine the13e (9) Protocol for inspections shall be as follows: a> ContractQr will call sub-contracted ln$pactor for weld inspection with a m!nimum of 24 hours notice. b Sub-contracted in~pactor (CHI) will perform weld inspection. c Contract~u will leave one wel.der on weld site being inspected 'to make repaira. d) CWI will re-inspect for fOllow-up and acceptance. ei CWI will approve or reject welds and document data. f: CNI will relay results to AlE or engineering proJect inspector and to Water QA. 9 OW! will work directly UfiQer Water QA and A/E. hi Hater QA or Project Inmpe<':tor will approve time sheets for sub- contracted inspectors daily. i; Water QA concerns will be directed to Engineering Project Inspector or AlE representative. Water QA Shall notlfy City ~ngineer if concerns are not addr@ssed by AlE. k Water QA w~ll follow Water Superintendent's directives only. 1 All das~q~ Changes and devia~ions from our 3pecification~ ~i~l haye to be mad. and approY~d by the City Engineering department. Changes will inclbde but not be lind ted to: de~Ji9n, size, proceduree, ma~erials and processes. 05020 Re.... ()l/19106 Page 3 of 4 ADDCNDUM NO. ) AttHII..t No. 1 ~Jol4 .p a "H1Hn2 ; al ~l 06 8:09PM; Page 18/42 m) CW! will I'lotlfy WOlter QA whenev6r leaving the JObBit8, Sub-contracted welding inspection company w~ll have a CWI on the joosite during all welding processes and stages of welding, unl@$~ other arrangements are approved by the Water QA. ~) Contractor shall not lnterfere with inspections, disre$pect or make any demtnds of dny CHI or QA inspector, All concerns shall be directed to the assigned project inspector. p) Contractor slIal... provide calling for inspections regullitions) . safe access to all (accoro~ng to OSHA inspector/'! ,before safety rules' and 0.1) Contractor llhall coordinate welding inspection with water QA Inspector in order to get the maximum number of welds tested during d typical callout. The welding inspection companies typically require a lO-hour minimum callout and will not be scneduled by the City until there are enough welds to make it economical to inspect (i 8. The City will not schedule inspection for 1 or 2 weld$ per day) . 7, HEA.SU~NT AND PAYMENT Unless indicated otherwise in the Proposal, all work and materials required f~r providing welding shall not be measured for pay but will be considered subsidiary to other work. 05020 Rev 01/19106 Page 4 of4 ADDlNDUM NO.. A~eat )1(0.1 PIlce .. 014 . ., j Sc ':Hi' 1':l '2; :1n-;":,06 8:10PM; Page 19/42 flr:~i-T!;~%~I;' u ! --t- I- 0:: o 0. W ax ! ~ m o 0:: e J.....J ...0 u i c( ! II) ~ ar:: ... ~ J i f I ~ ! ~ ~ ~ ~ e ~ t= P I: P I; I: :1 ~I .ei ,.~ .Q~ ,~ $~ 'i.9 is IS IS IS I~ 1) i) 11 11 11 J! jf if if if if fil ,I jl .1 .1 .1 J ...: C'oI .r r.l ..___ ~_ p N ~ N ~ N 11 J J J J 1 J : ~'I; I i I i J ... I <t ~ ! c !:i I ~' I H,II jll 3D. Ii >-Ra ... n ~! ~I II. 1J. t N ~_ J! j J ~J J J -Ii 'II' !JI~ I~J! I;IJ C) on il I' I ~ i j i e ~ I ill I ! Ij ~Ij UI ~iJ Ii! Ii: j-/ii ij 'I- iI 'PC'll iU ~ ,; .fi~ ..1 J Jj ~f h "';N I} I I j J ! ~!ii ill! IA ~, itj ~,"j? 3, ('6 B: 1 OPM; Page 20/42 rT --T---r /.,1;: It if fi f ~..~ r "" ---r-"' I ...~ ~f i8 s.. -.- ...--- If - .. ,... .. :s 1 1; 'I 'i i 'i i wI ~l t J :1 t J ~ ~ ~H'f ~h J f ~ " II 0- Ifl I fit I ,: 'J '~I ,~ '~I. J f !f. J j s~1 a~ s~ ~ I J S ~ ~ ~ R 1&, is Ij RSjw , ! SB, 'J 11 ~I Ij ~ 1 ~ 1) ~ 1 ~ ~~ 1 " , J 1 " J I ~ff ~f ~f ~fr' ~fr 6 lu IJ IJ ilii,iJi Ilii,iJi l ,fl~ z fl~ ~,..-., ""N "';C"Ii ....: '.t .. t6 ...:~. .,;. 1ft .. J )1 ! i J I j ! i J i i , i 1:1 II I I ~ II) ... ... j : '. - ~ to ~l ~ l .: ".\ f ... ~ 9 IjJ ~ JJ : J , : I !JiU !JfU .U~ !jfl _~fl~ f~Jii Jil! JSI' &:ii" JI iJi ;; . ~ ii .... It) It) If,I 1ft J III AI J il G. G. +-.... i:l~ III dt !il] 1>1 c ~n ~ 06 8:10PM; Page 2' 142 ~'r---- --' - ,- I ..1" '......,"... f ~ I' ~, i.1 -J. ~~ ~ - I - ~ i --t-~ _~_u_.. ! w ~ , I: I :.," .. . :;1 ~I II ":N H .. - ~ 'J f~ if II jl J II i ,... j I jj 0 I ~jIUI! w w . I:lflifj I: Ii I: ilifl~fiJf i! i: il .IJ II) 11 il II "ffflif jt if jf~f ,'illli!! " ,I ] ~N~ ~~. ~N ~N ~N 1 1 :t ! I I j I I I I , ;z "" . I I ! I Ii: ~ I. .d I'I 11= ,~lli 'il"i I I hI. uiu Ih ';! Ii ..~ II lJ - f j f , el I '.1.1 ~ ~, I ~I . JlrEl .Ii {.II I .1 JJ)"JJ ~IJfJ iun ~~..; flit ! f j I m . ~ . ! j ~ 9 l jJI ~ IiI j8~1 .111 JIll II!II i~11 Ill. il!i ~Elii .S!i ... ... .... NLIl ..,111 ..J :;;1 iiil :;;i .. IftW in! ll. -IN ii~ IIi ... > ~ t'\ ' '\!-~ ;' _; c' . Ii, Ob 8: 1 aPM; Page 22/42 r---,.. __'~I "--~, I ,'-- I- I ,. ~~ . ~~ H H I ---..--.. -t-. i i I J J If I i .' ' . ~ I 'i I I , ~ ',,'IJ 1..2 'I } ~i ,f!', ~ :1 a~~ ...... B~ lJlj '111i .- i ;JJf5fJIIJh d .., J .dlfJ I' .,HUlId ,I . "':N<"i .. iii . ..:- N ;j j "\",' ":,1",\," I " z j ... I I ,. ~ I .. ! ; ~ Iii! i.l1 iBi I hI.; i i I ,.. l ItlS ,i! ,n Ij ,j ~~fJ ~ a~ill' ~~ 1.8, " 1:$ sIte, 11 ill;!, ~f IJ""lJi J f Jili r ""':Nft ....:N j J 1- ~ !~ S1l!Q HI i~ -ot'- of-_ ~ I. II I: w Jt ,~ -ifi' ,~ '~.i .~ JI~I! 1$1 '1$1)1 :1 :in J jl ,I ,Ui ':f'Ii ~Nft I i 1 j I i i ~~ ~= ~ J~ ,fJ ~ IiI I '~J~ !1t5~ J2111 If@ 'JI'I iii I!' IIJ! 181. 8-8Jdi ~... ~ -IR jj ... VI l(> !I ~f ii ! Q ~ I jj) i ~ f ~ ..,I III H'li ~IJJ I;!iii illi ." 10 i;; !j ~... i;... ili :l ~, tH:f.:H:F: c: , I; ~~ --.-I--~- i ~Ie ~;!, ~! j~ --t- a~ 2~ 06 8:11PM; Page 23/42 ... ~ ...... ~! ..... ij... IIi ii w (J I- : Ii '" .{ ~ u.i ~l l:! ~ ~ :t U I "I '5: ,~ ,! .;j JiI~ a~ JiI~ t.e IS i.8 Iii 11 ..I j) ~f! i1f jf ~f hJ iJ II ,I '" ....:~C"'Ii ~N ~f-..i "';N J J II J j I j I .. J .. , I I J I 'lS Q I , i ! !' "J,liil', UI ',Ui i .. . M . '. ~ liil~. l j I .., ~ ~ j ~ :: I J 1~f5 f " I gIll wJJijl d~ I~ I. )>1., 10 ~.!ilS"ii ~..:. on .... 1ft ai a~ ~I I ,j ~ -~ '~ 1 ' 8;1 ,- ,_~A ': 2' ~ ar-2 06 8:11PM; Page 24/42 -r- ------..---. , I~ f~ ....N ~H~ ii... . ., -~ ~~ ....". ili -,-,~- ~----------_._--- . J ~j ,= i J.j ilf~ j. i II ~i I !!i iillli'! . ~I Ii If i .:i: i,!,I)11 wi . ~J I ' ,~! I If I '..- f;!. .:i Iii'. :11' lelj!til ,: ,;!I i.rJ~ I!~i' :I:rf!i( . .s~ fa .~I,.Jllfl 111!f- Jff"Jil I iJ ~jflf~ljiif tfJfl"fJ'J'lli ~f " sf 1.1, II I Ili.~IIJ i'JI~ .. ..: N~_"'; iri .. ,..: .a ~N i Ii i 1 I J J z: ... I , I i I j ~ J cu I .. ~ J I f' I ,:! I ell J I I J.~ I t ~IUI din III fellii ~~Jii .:.:..~ '^ '" li~ J tll - --'''--'-'--'-- . 'jH ,,:,.,,. ~:lb 8.11 PM; Page 25/42 r--T-~----; ..- I' I --, , r r , I ".......... ~ lJl :g ~ . 'I; +.. + + I. ~F- ~~ PC>I ....'..'Jii , ' ... [ I i I I : .. .10 I f : IH i i B I ,~ : ~Z. J St~ i'! II I IS ihj. .i II ~fJ I" I ~f I ~,'fl. II .. h hi) ... ,...:~ . ~.... . ~N "'I J i J I ! I I ,. ;" I I : ': Z .,"" . I .. I I f I I ! ) i II I I ' , ., to ... .... . is ~ II!: i, ~ II i i I Iii! f~ ': I ~ ~"J ... J~! ill :i!ii u; I' ii Ij) tl~ 11 (/) o t:>z z 0 d?Q (/) z l.o.J (f) LLJ a.. o ~I- a:::1~~ Oi~8 )-'1- 1:=1 J' :.....1 I-- ::Ji I :is Ht1jH '<', d ~ 06 8:11PM; I~ ~ : r i I! ,J I !, ! j ~. 0.. ~ ~ ';,oLo ~I\" ...fzco"a:l'.~o <o1....."<D'~ ~Jo. tOJoof<co ...I".l-g() t"l jg lD... llC 0 W 0 ...,,~ ~ l/') It'l '"" .. "'11+ "'1 N I"'l "'1 ~ N -+ n _ I/) N;. .. I""} to'} "'I 0 ,..., o U 'i .- I' ~ ~ i ~j 8 ~ ~ ! 8 ..I g 8 8 ~ ~ 8 ~ S ~ ~ 8 8 ..! ~ ~ ~~. ij~~~~]i~jll~~j,j~II)li~~~I~I~ l~u4 ~~ii~~~ ~ii~~il!~ ~~~i ~~i li~ 1'~II.~~~~IN~I~9~1~11~!~~NN~~~ ~ ~~ ~ ~ ~ ~~ ~ , 0 1 ~ ~ ~ ~ ~I~ ;: ~ i ~ ; ~ ~ i ~ i ri ~ ; i ~ i ~ rs i i \; ; ; ~ ~ r::::' ~:r:'~:i ~ :]: :x:: i ;J: ~ :x:: :r :l: ~ ~ i! ~ :@:x:: ::J: ~ :l' ;;:&: ~ ~ ~ ~ ~ ~~ ~~:i ~~!5?~~~~~,~~~~*~~ ~ !$!~~~~~~ f- (f) ~ ~ z I.~ ~g~lla~~~~~~al~88~~il~ I - N 5i! ('o,/":.{. N..... ,... ,..., C'l ~I~ N .- N ~ S! '"" .- '" - ..,. S! 9: I I I I I' I I . I I I I I I I I I t f I I~J;1;ld. I I ,.1 ... .... i"'''' ~Ii ili,iH~ ~ re ;';'- -1..- It) ilj~ r- <-,... J:l1. ~ iil: .,1; i'i ii Ii ~ ~ ~ ii ~ ~. ~ ~ i ~ ~ ii ii iij ~ ~ ii iil~ ~ ~ Iii ~~ ~2 j ~! ~i ~~ ~~ ~ I ~~ ~X~II_!~ ~~~M~"'~~ ~~! ~ ~ ~ I~ i' !? ~ " :; ;: .... I' ~ .... F: :2 ........ 0 ~ ~ ~ ~ ~ -' z "'" .. ClP) . . ~ 'lIO ClO .- 'CI) . M..... . ~ "'" .... ..,. ..,. ~ :S 0 gO~~ I ,...~co ~""'t';~ I ~~lIO~.1"'''''!I)..oao Oi7l. ..... .., '" .~ 1"1 ,... ':.t ,.. ,.. ,... r-.. I.IJ .n . " , , ~;:t; ~ d ~ .1(j ~ ~ 0 u ~ u u 'ti I") ~ OJ x" '... a.. ~ X'-';--: lID --: D '" , .Q6 , ..l'C -<:II) o~~......"" 0 cn2 >-0..., ._"". U ;1-(,.), . ~c.>.....(,.)(.)~u..... ;~~ tl In ,- I ~ .... -- 'g :e :! -;; I" .- .- ]I ...... .... ~..,..x ""~..,. ~...~~ ..,.x..~ ..,.",,~ ~~ 1_ 'c: ,... ..... II- ......r ,... ,- 'E ,.. ". ". 8 ..... .... ,... ,.. 05 ~ ..... .oJ:; _ 'J;: 'E - lC> II) .NN U~~~NUU NgN~nN uw~~~n ~~~lljl~~~~!!~I~j~j~~J~6~ii~ ;~ ! i S ~ [;; ~ gl ~~ ~ ~ ~ ~ ~ rn ~n~ S ~ f;; ~ .18 8 ~ ~ S ~ ~ -0 i ii i7l ~ liS ~18 -a 1 ~ ~Il ~ N ~ II'; B r; Ii) (.) .... v5 -d 8 c;: Z 0:: tr: e I ft j A 2 ol"t! ex fEE ~ g ~ e ~t= 5 .0 015 a:: ex] iE _ a.. t 88/f) d! ~ 81cfl~ ~.i.2 ~ 8 as 8lJl~ 8 tD fQ. ~Iil~ Cl. ~S~ ~Z:i; ~!z~~Z~I~;;i~zzl:z~.s:;:~~:~ 9~!i Sf~I~&~~~~~~~ ~~~f~~&~a~I~~~ ~~~ J! .... ..9 I ! ,....cn(:j .'. j~~j i IJ : ~ ...~ ~~~ ,. &;J!i 1:1"" N':' 11) o:s 0!i.91~ I~ ~fi32 1:: i c: 1Il 1Il u 1 ' Ii 1:: e ~ 2l .c: 9; ~ ,. N c! ~ ,~ 8.3 N ',. N N -, :I ~ :i! x en::J (5 -~jl~J~~jl JIJill. ~jl ~j i?~~ - ~ I. ~ 0 ~UJ J1.E - ~ I - ~ II ~ z ~ lu:'~;~;j~i~' j~:uji~~~H~:i :i~ 8 C!: e ~ ,j.. i E -~ ~ E 1 i;- e ~ e i ~ '" II!~. II< 115 Q i en ffi Ij'll~! iilj~u 'j~ rlij~ i~jjj8 ~::J8 ~ ~JJ ~JAj~~ijJ!lijj~]iR~~~~~ -t~~ <Q..Q. ~ +i 0 ~ i3 ~' . 8 liD ~~ IS ~ 81" ~ &\ ~ S ~ ~ ~ ~ li3 :. ~ ~:3 * * ~ 0 * ~;t:.; .:t ~I.t <t,1; c1; ,:t;.i'... ~~;.t ~ c!;<t tt ~ ~ ct rt rt.t ~~ l.~~~ ~~I~~-~.. ~m~~~~~~,~~~~~ ~~ (:' -...---NNNNN~~~N~N l')! ZV'l - lfl t- w Ul ~ Xi~ W a::: w a:: i o 0 l.J... t- z U 0 ~ t5 z 0- o I- U ~ o u , rl ~!r!" 1. ,g..f~ Page 26/42 -. i~.. ili '-Fi! --!':',; '/1 ,11 .'" cJi3 8 _ 1 2PM; Page 27/42 AlMlED i-Corpus Ch;isti SO~hsid; W~-t~;-Tr~nSmissiof1~in I ! Corrosion Control Test Stations -- ------. '--'---~'- ...,,,.--. ---. ----, ~M'_ _ _ . Test ! Station No. I-~- ,__ i 1 ~-j 2'~ ...~2I.Wate'r -~ --- . ~=--:-'3-.=T .. '~2+00 '_ ~:Wa~~~_==~ ._ 4 ! 30+00 : 42 Water , 5 t-- 41+50.t-4~w Water --"-- ,....-.---6 -+--53+00t-" 42~ Water- ...----- t,--;;~, -,t:..~~~..l !fri~!,!' .. .===-'.. '--8 75+~~" Wciter---.--.-- g-'.. - 1==83+34 r- 42w Wotei,7DUke Energy- -~ ,- 84+41" ...........<4-2~ Waterjcrosstell 11 t-- "92+60r42" Water/Duke Energy-- .-~ 92+87 i' 42w Water /6osstex r-"t:~J~- '.._ L'1'r- 1 +00 .. ot;-;---- ---~...... ~;'- ~~~~ I _ -~: :~::;- --- -.-=== i - :::-.t~~: ~~::~;::: ~:{~:~::~~ --....--- 18- 146+08 42-'O...WcterfTexos. CrtJde'! -19-- 153+00 !-"42~ Water ----.- +-- r--'~-~~-' ~~;~~-t 1~: :~::;/Iexas__c~ude___i : -.~ -.--"177+50 I 42" Water-- -----I L:=--zt!. . -...... !. . B I ! tF:!!/DUke' - Energy "..- 25 --+ 208+00 -~ - ~T' Water - r- :. r .,mBo t.;~J.. ==.~._~-==. 27 229+00 ' 42 Water C"-- 28'_ _--.?4{)~o~ri' 42w W?te~_ ___===--~.!,oJe 'Mounted Potential Te~t Station __ L.- 29_~----l49+50 I. 42" !?t,e.r ____+ Pole Mounted Potenti~I,.T~t~~~.~?~.. . 1 ~.~__. 257+87..J 4?: Woter/Crosste!-___+.__~ole Uounted Foreign Pipeline Te.st Sto~l()n ~"~- ~ :~~i~ttmt-:~~~-~~~~-~ 7i~~~i1iEji-- -r-' ADOEHDUM- NO. 1 AItIle.......nt No.. hue 1011 .1 t1'i" ._~b:-2 1 ar~ 06 8:12PM; Page 28/42 PRO P (] S A L FOR M FOR S0U'1'lf8IDB WATBR TRARSNISSION MAIN PHA8B 5 ROOD FIBLD RD. TO 1I8I'.l'I!:LBY DR. DEPARTMENT OF ENGINEERING SERVICES CITY OF CORPlJS CHRISTI, TEXAS ~Y13ed11 i'I\OPOSAL FORM PAGE 1 OF 15 -ADDGa:KllI NO. 1 At:~t Mo.1 Page 1 or 15 ,~ t:~ ;".i!1 Db 8:12PM; Page 29/42 PROPOSAl. PLace: Date: Proposal of a Corporation organized and existing under the laws of the Stat@ of -_.. -_..__..__..~- .~',""--'-'---.,."- OR a. Partnership or Individual doing business as TO: The Ci ty or Coapu Cb&-:l.ati, Tezas Gentlemen: The undersigned hereby proposes to furnish all labor and materials, tools, and necessary equipment, and to perform the work required for: 800'rBSmB IIAIfJDl 'l'aAII'SIIISSJ:CI1IAl:H lI'BASB 5 RODD I'DLD JD. TO lIU~y DR. at the locations set out by the plans and specifications and in strict accordance with the contract documents for the following prices, to-wit: ~8od1 !'ROl105AL roRH PAGE 2 or 15 ADP&NDUM NO. ;J. Aetaclmant:. NQ .1> P*\JlIl :2 of 15 .......-.-, "--i- ---.,.-., alOI> MOll n , ! $ pSI LF -t - -------...-- i 5.0< Pipe n plac@ per $ -- -" 11.25" Pipe place per EA $ -- 0 22.59 Pipe place per EA $ -- -~- 450 hpe plac~ per EA $ -- 67.5" Pipe place per EA $ 90. Pipe place per EA $ -- e, complete - $ complete in i I $ -~'-- T lete in , $ -- e, complete $ - ----.-------..0....-.._._._ --....-e--'-..........",.."'_,__.."""...,..,..~.._~~__.._,....____ =-_._ ~ -- A- i _ b 450 I 4 ",' U.l.d.. r r anSllli.e , ..1' t complet$ in place . :,r-.., ~:~i~~;::;C, 42" dla. 5.10 to Bend, complete in 42" dia. 11.260 c Bend, complete in 42" du. n.6" to Bend, complete in ~~'_._.-- 42" ctia. 45.1" to Bend, cOIllplete in 42" di8.. 67.6. to Bend. complete in 4.2" x 24" Pipe Te in place per EA 42"x16" Pipe Tee, place per EA 42W Pipe Plug, comp place per LS 42ft Butterfly Valv in place per EA ~i$~ Proposal Foro ....g.. 3 of 15 ~NO.+" At;ta~t. No..: ~*9. 3 of 15 ---- .,'" .'1 "1:' '1:''',:" dll, 06 8:12PM; Page 30/42 SOU'mISIDB 1IlLTIIR 'faARSlaSSXOIl NIUR PllASB 5 RODD nBLD ID. '1'0 WBIDLKY DR. BI.SB BID 'A' ua lIRUPD CCI'8fC:DD SlfaL CYLDIDD. PIn OR STBKL PIn I It III IV V IIID an , D&8ClUP'l'ION UNIT PlUCI IDII ZXft118tOlii IBM U1!fU sm d t1 ,1M,; c: . .:1 06 8:13PM; Page 31/42 SOO".I..m. WImIR TRARSNISSJ:CII aIX PIlASB 5 ItODD FmLD aD. '!O _IftLft Dll. BAS. BID I A. I BAR. DAPPQ ~ BRIlL c:nmDD PIn: OR STBBL PIn:: I II III IV V 8m Q'rY " DZSClUP'fIQf UM.U PJU:C3 BID ITllM J:XTQt8:IQiJ tnx uta'! A-12/165 "Insta.ll OnlyH 66" Di.... Casing I 1r Install+d by Open Cl.lt, ~...,...._,~ $ COIlIp!etfll in place f.'er EA i A~13 31S 66" Oiil. Ca.sing Infltalled by 1 .LF L-- boring or tunneling, complete in place per LF .$ I A~14 12 Air fl.elease/Surq4!l Relief EA Chamber, complete in place per EA $ A-IS 4 Blow-oft Valve, coxnplete in EA place pelr lA $ _. ~._. A-l6 2 Blow-Off Valve with 90D Ell, FA cnmplet@ in plac~ per EA : $ - "- -" A-17 Guard P05t, cOlllplete in place FA $ perEA .- - A-le 13 Metal PQst with Sign, "'ompl@te E1\ ln place per EA .$ -" A-19 1 Cayo Del 0$0 Crossing, LS $ compl~te in place per LS 1\-20 .J. 24" Dia. Gate Valve, complete EA , in place per EA $ -- A-21 ] 16" du. Gate Vallie, complete EA .$ -.-- in place per EA _._. A-22 1 24" x 12" Tee, Complete 1n EA $ place per EA ~.. _...~. J{ev1se~ Pro1>Osal FOrm paqe 4 of 15 ~ RO. l_ At~t; 110.' ~4~15 '.:1 h8r,JHU~' ; 211;' 06 8:13PM; Page 32/42 SOtr.L'!UZD& 1fA1'D TRAIIUDaS.IQI IaDl PIIASB 5 IODD I'IIILD ltD. TO -rntiIt DR. M8J: ISm 'A' BAIl 1IRUl'Q ~ S'taL CYLIIIDD PIn OR STDL PIn I II III IV V axo Q'l'Y " UN7'1' PRICI, IBM UNI'1' DIUIClUP'tION BID I'fDI J:nJDf8IOII A-23 1 16Mx12" Reduce.!:' , complete in , EA place EA j $ ~- pOllir , ---.._---- I -, I A-24 1 12" Tee, complete in pl~ce per , EA EA S -_. - ......- A-25 2 12" Solid Slel!lve, complete in EA $ place per EA 1 ~. A-26 2 12" Gate Valve, complete in E;A S place pel:' EA ".-- -., A-27 90 24" dia. Ductile Iron Pipe, LF $ ~--'-20 complete in plac@ per LF .~ 20 .c6" Dia. Ductile Iron Pipe, LF $ '"'Ofllplete in place per LF --.---- A-29 20 , 12" Did. ')\Je-t i 1 e Iron Pipe, U' I $ complete in place per LF 1\.-)0 ~y150 6" Lime Stabil. Subqrade, complete in place per Sy $ ,'~ ._-- ------------ A-Jl 3650 e" Flexible Bas@, complete in Sy $ place per Sy _... _. _.. A-32 ~y890 I 1-1/2" HlllAC Pavem@nt, complete in place per Sy ~ . A-33 420 6" Concrete Pa.vement, cOlllpleto SF' $ in place per SF ~. A-34 460 Concrete Curb ;lnd Gutter, Lr $ cOlllplet@ in place per Lf' -'- .- - 1\-:35 1,840 Concrete Sidewalk, Complete in SF I $ place pe~ SF j ~ 1.-. - ---------... ~ville~ Proposal P'om Page 5 of 15 ~NO.l.., A~~t Mo. i.. Paga 5 of 1.5' ,... ,P a H.[1- ~HfJC', 31, 06 8: 1 3PM j Page 33/42 SotnlUIDB WAT.D. TlWIBllISSlcat laIR PBASK 5 ROOD I'tII:t.D JtD. 'l'O "It'BLI:Y DR. BASI: BXC 'A' au. tlRUnatJ CCIICSUlft S'IDL c:n.DIDD PIn OR STDL PI:PB I II III rv v am Qft " OMlor PRICE DJUIClUP'1'I:CJR BID I~ &xTmISI:CM IBM UHZ'r A-36 13 Reconstruct Sanitary Sewer I EA j Laterals, complete in place $ per EA ..,-..... -- .~.- A-37 1'; Reconnect Sanitary Sewer E:A Lateral. complete in place $ per EA - .._.~ A-38 31,000 Trench $afety, complete in !..F place_p.r LF S --- ~- A-39 19,850 Dewatering, complete in place LF $ per LF __________m_.__... ------.-..- A-40 30, 900 GeotextUel complete in place SlY $ per SY ._,.. A-41 15,450 Crushed Stone, cOJIIplete in SY $ place p. Sy . ~---- A-42 ;: Remohilization, complete in EA place pe'ir EA $ ._.__...~. A-43 500 Disposal of Contaminated Soil, CY $ completo in place per Cy A-44 Utility Allowance (*ndatory LS Allowanoa) , complete in place per LS 50,000 SO,OOO Wa'ba2 'rI:'aaaai...iOQ Na.iln ....t:.eria1. (Circle one): "CoI'lC~i:e Cyl. Pipe" or "Ste.ll :Pipe" TOTAL BAS. Bm ' A I $ NOTE: The above unit price$ must include all labor, materials, bailing, removal, overhead, profit, insurance, etc., to COver the finished work of the several kinds called for and tbe Owner re~erves the right to increas@ or decrease the quantity of any bid item. The abov@ quantities are approximate and may vary from the final quantities. Do not ordEn:- materia} based on th_s@ &PProximat~ quantities. ~eVi5.4 Proposal Form P"<jle 6 of 15 ADDDIDtIIf NO. 1 Atta~t No,' ~6o~15 .-<~ a . ) '<8' JH02, an cJ 06 8:13PM; Page 34/42 SOt,,:,tlbaxoa 1G.Da rRAllISlaSIICIII IiIUJI PBASB 5 Ram I'Im.D RD. !'O -I'l'&:LBY DR. BA8JI BID · B I DOCl'ILB IROIt PIPB I II III IV V am Qft " DB8C1UPl'IOIN tINt'!' PRICII 8m Il'8I: KXUNsICB rm. UlUT B-1 28,450 42" dia. Transmission Main, LF complete in plaoe per LF S ~ .1 11.250 ~- B-2 27 42" dia.. Pipe Bend, EA complete in plac@ per EA $ ---- B-3 10 42" d1a. 22.50 Pipe Bend, EA complete in place per EA $ _. B-4 21 42" diil. 459 Pipe Bend, EA complete in plollce per EA $ .- 8-5 1 42" db. 900 Pip\!! B@nd, EA complete in place per EA $ 8-6 ~ 42" x 24 · Pipe TE!E!, complete $ EA in place per F-A 8-7 42"'x16" dla.. Pipe Tee, EA complete in place per EA $ -- 8-a 42' Pipe Plug, complete in EA placa per EA $ -- --......-- '. 5-9 1 42" dia.Butterfly Valve, S Ell. complete in place per EA B-IO 165 "Install Only" 66" 01a. Casing I";' Installed by Open Cut, t $ -- ~lete in place per LF 8-11 315 66" Oia. Casing Installed by LF boring or tunneling, complete I in place per LF $ _. ----~...- B~12 12 Air Release/Surge Relle f EA Ch&nbe:t" . cOIIlplete in place per $ t~ ItA Blow-off Valve, complete in $ place p~r E:A IlleV:l.M<I Propo~al FOnn Paq8 7 of 15 ADD2NI'.JUM NO. L At:Ca~t: 11<>.", ~ 7 o~ 15 i~' ~r \B02 c j 06 8: 1 4PM; Page 35/42 SOU"JBSIllE 1GU'D TRUsaaSSIoar laD' PIIASB 5 RODD J'I&U) aD. TO waI'l'BLBr DR. 8AS3 BI'D I a I DUC!'ILB I.RC8 PIn I II III IV V aU) on , DBSCR:rP'J'ION UNI'!' PRICI: 8lD :r~ ~ItWII rDN UlfI'l' 8-14 2 Blow-oft Valve with 90" EL, lEA $ -~ complete in place per EA Guard POgt, complete ,l.n place $ , &A ~. per EA - .. --~-- B-16 Metal Post with Sign, cOlI'lplete EA $ ~. in place per EA - '--- ~ I , B-17 .. Cayo Del Qeo Crossing, I L.S complete in place per LS $ ~... 8-18 1 ! 24" Dia. Gate Valve, COlII.plete EA $ in place per tA ..-. --.- 8-19 . 16" did. Qat", Valve, complete EA in place per EA $ B-~O I 24" X 12- Tee, Complete in $ EA I place pet EA --_..,~ 8-21 1 , 16"lC12 " Reducer, complete in I EA place oet FA $ --....- --'.'. ..--.. 8-22 1 12" Tee, complete in place per EA $ EA 1---.- ---------, -.--.--.--...." B-23 2 12" Solid Sleeve, comphte in $ EA per EA ---,... place _. - B-24 2 12" Gate Valve, Complete in $ EA place per E:P. --- 8-25 90 .24" ala. Ductile Iron Pipe, S Lf complete ;In place LF --~. per -.., 16" Dia. Duotile Iron Pipe, S ::lit complate in place per LF B-27 20 12" Di.!L Ductile Iron Pipe, I $ LF cOJI\Plata in place per LF - - ~J.8ec:l l?ropo:!Jal rorm P!lge fl of 1') ADDDDON NO. 1, A~t:ac:hlulnt: No.' Pap 8 or' 15' .... ,:1 _d !'Q1 jHC2. a Ii , i 06 B: 1 4PM j Page 36/42 SOUTII8:IDB 1aT&a 'lItAlISNIS8IC81 JaDI PBASI: 5 ROOD I'IKLD RD. TO _I~ DR. BASI: 8m IB' DOCfl'ILB moll !tIn I :u III IV V 8m gn fo DR8CR.lftla-l' UlfI'I' PlUCK BI.D ,IftM ~];CM II.'IIM UNIf 8-28 ! 1. 150 6" Lime Stabil. Subgrade, I BY cOtllplete in place peL SY J r $ B-29 3650 8ft Flexible Base, Gompl~te in j S Sy phce pw $Y _.___n_ , B-30 ~y890 1-1/2" HMAC Pavement, cottlpletc $ in plac@ Der SY .-. .- I 420 ~ B-3~_ 6" Concrete PI! V@Ill@nt , complete $ SF in place per SF '-. j 8-32 460 Concrete Curb and Gutter, I LF $ r complete in place per LF - A-33 ~;840 Concrete Sidewalk, complete in $ place per SF .- .. B-34 13 Reconstruct Sanitary Sewer SA Laterals, complete in place per EA $ --'- -.. -,-----.- '- 8-35 15 Reconnect Sanitary Sewer I EA Laterals, complete in place S --. per Ell. - .. --..,-.-.,----- B-36 31,QOO Trench Safety, complete in ~ LF place per LF .~._- ~ B-37 19,850 Dewatering, complete in place $ LF per LF .-----.--- B-39 30,900 Geotextil>8, complet8 in place $ Sy per SY B-39 15,450 CrU3hed Stone, compleLe in $ Sy place per SY -~...--. -....-.... 13-40 2 Remobilization, complete in b S Ell L-- ..- place per EA. ~evi8ed1 Proposal FOrm P~ge 9 of 15 ADDJINDUM NO. t_ A~~~ No... Pag. ill of 15' ,i-( ~HJt~~, i "' ()6 B: 14PM; Page 37;42 S~IDB HATD. TlWfSNISIICR ICAIH PBASB 5 ROOD n&LD ttD. TO -na.n DR. MSB BID 'B' DOC'rILa IItOlf PI" I II II! IV V am 0'l'Y " DKSCRlP'l'ION own PJUCB tlSK tDfI'r BID I'IDC IIX'IBNBIClIf B-41 500 Disposal of Contaminated Soil, -:1 ~' cOlltplete in place per CY - I~ :...S Utility Allowance (Mandatoxy SO,OOO I A11~ClIII) . COmplete in place L Der LS $50,000.00 "- lfat:a&- "~an~..ioa JIiL:iln NabN'1aJ. "Duot.i.le Iroa Pipe" 'lO'fAL BA8& em 'B' $ NOTE: The above lmit price!! mUBt: inClude 41l 11lbor, mater..als, b....1in9, removal. overhead. profit, In81.lrane., etc., to cover the finished Work of the se'l7eral kinds c$lled for .nd the Owner reserves the right to inc;r::e4~ or decrease the quantity of $ny bid item. The above quantities are approximate and may vary fram tn@ final quantit185. Do not urder material b&seO on these aPProximate quantities ~13 PropOsal f"orm J:>l!ilge 10 of 15 ~ JIO. 1" At1:ac:haent: Mo.. Pap 10 Qr U d H 1:1 );~ . J'l " 06 8:14PM; Page 38/42 BID SOItMAar BIDDER may bid on any individual and/or combined Base Bid. If t8er. is to be no bi.d OD any part, write in nHC) BID". Base blds listed ~n the following summary shall match those totaled on the following pages If there is a di~crepancy, the totaled bids on the fOllowing pages shall govern over those listed below. .... BID 'A' CoDczoete CyliDder or Steel Pipe $ Circle pipe rnaterlal to be provided: hconcrete cylinder" Or "steel pipe" BAIa BID '8' Duetia Iron $ Jlev1a!!dl PROPOSJU. roM PJi,Gt: 11 OE" 15 ~NO.l,."... At~t Mo...., .... 11 of 1'," '. ".i" . ,p d HH ::~MU2 ; dn-/OB 8:14PM; Page 39/42 The undersigrled hereby declares that he has visited the site and has carefUlly exami:ted the plans, specification5 and contract documents relating to the work covered by his bid or bids, that he agrees to do the work, and that no representations made by the City are in any sense a warranty but are mere estimates for the guidance of the Contractor. Upon notificdt~on of award of contract, we will within ten (10) calendar days execute the formal contract and will deliver a Performance Bond (as required) for the faithful performance of this contract and a Payment Bond (as required) to insure payment for all labor and materials. The bid bond attached to this proposal, in the alnount of 5% of the highest amount bid, l.S to ~come the property of the City of Corpus Christi in the event the contract and bonds are not executed within the time above set forth as liquidated damages for the delay and additional work caused thereby IUaOZity/MinoZ'ity Bu8ine.. _~Z'i... :P~t.iaipaUoD: The apparent low bidder shall, within five days of receipt of bids, submit to the City Engineer, in writing, the names and addresses of MBE firms participating in the contract and a description of the work to be performed and its dollar value for bid evaluation purpose. ~r of SifDed Seta o~ Doa~ta: The cont~act and all bonds will be prepared in not less than four (4) counterpart (original signed) sets. T~ of ~~D: The undersigned agrees to complete the work in 380 Ca1~r Da~. The project has been divided into phases. The Contractor is required to complete each phase before proceeding to any other phase. At anyone time, except as noted above, the Coa~ will not be a1.1ow.cl i:o .t.aa:t or 1fOJ:k aoDCQZ'~1:.ly in ao~ t:hml t:wo pba.... Time duration for construction is allocated for each phase, and if the work in that phase ie not complete a5 shown below, liquidated damages will be assessed for each day the work is delayed. Phue I Pha8e II - PbaM III- Ph.ue IV - Statioa 0+09 to S'tat.ion 101+80 S'ta1:.iolll 106+80 1:0 Sutioza 212+4>>3 StaUoa 212+63 to St.aUOII 2'5+73 Cont;r1LOt CJ.o.~ 155 Cal.-a"'~ Day. 7 5 CaJ.e1lC!laz DaJ'. GO Ca~d... Days 10 ~ Day. The following tasks shall not be affected by the phasing: clearing of TeE and UE, surveying tne water line alignment, TeE's and UE, pre-e~ploratory excavation, offloading pipe and storage within the designated TeE's and UE, installation of casing pipe by boring hydrostatic te5ting and disinfection. The under$J.gned further declares that he will provide all necessary tools and apparatus, do all the work and furnish all materials and do everything required to carry out the above mentioned work covered by this proposal, in.strict accordance with the contract documents and the requirements pertaining thereto, for the sum or sums above set forth. ~.e4 l?ROPOUJ.. ,"OM PACB 12 OF 15 ADl)DUQ( NO. 1.._ Att.~t No.", Pave 12 o~ 1& -jp d j 1 ,,8 i802; ani068:15PM; Page 40/42 number Receipt of the following addenda is acknowledged (addenda .--.-. --".,~._~ .._~_.__..._._--- ~--'"~'~"----"---""'-' (SEAL - If Bidder is a Corporation) NOI8~ 00 not de~ach biQ fram o~.r pspers. Fill in ~itb ink and submit Complete with attach~d papers. Kespectfully submitted: Name; By; Address: Telephone: l!!eltill~ PROPOSAL roM I'M! 13 OF lS (t1:IIiIIlMUQ) O!.O. Box) (Str...t) /City) {State) {61pl (Revlge~ August lOaO) ADDJDI:XaI MO. 1 Attachlaent: No. .., Page 13 of 1! .. ...;p a "i:! ',jH02. d~ ~ 06 8:15PM; Page 41/42 iF = CITY OF CORPUS CHRIST. DISCLOSURE OF INTERESTS City of C~rpu5 Christi Qrd1nance 17112, as amended, requires all per50n$ or firms Seek1ng to do bU~1ne8s wlth the City to provide the fOllowing information. Every question must be answered. If the q\legtion lS not applicable, answer with "NA". "IlK KAMI:. 81'U1T; CI'1"1(: Ell>; Sole Owner 0 4. ~sociation 0 i'tRH i.: 1 cO.t.poration 0 2. Partnership 0 3. OtherO DI8CLOSURI QUKSUOJIS If addit10nal space is necessary, pleaSe use the reverse side of this page Or attach separate sheet. 1. State the n.au Q~ ..ab "-.pl~" of ~ Ci.t:y of Co%pu.e Cbrieti ha'f'1n9 an "OWDCahip iA~.t" OOI'UIti.tutilJf1 3t or .01:'e o~ tM OWDU.a:Lp J.ft t:be ~ n...s "ri%1a"". Nam@ Job Titl@ dod City Oepar~ment (it known) ---- ---------------~_. ----------- ---. ---------- --~- --~._--_._--- 2. ai:at.e tM ..... or MOb "'oUlaid" ~ t:M City t4 Cozp.w Chrut:.1 having an "~ in~.t" CIODIJUtutiJag 3\ or acre o~ t:bI 01IIDeE'm&p 1.n tb. lIbove ~ ..t'1za". Name Title _._-~~--- --~"_.~.. --- ----"""'~- ~ 3. '~b tb8 ..... o~ ......board -.ber" ot tbe Ci~ or Co:z:pu. CbrUt1 having an "ownetahip .i.n~t.. oonatit:ut:.in9 3. or IIOre of t:be ~p in ~ abav. nAMId "r1Dl'" Name Board, Commission or Committ~e ~--,---_.- 4. .t:at- the naa.. ~ eiIlICh .-pl~ or ~.i.CIIU" of . "QQIQ.n1t:ant.. rm; ~ City ~ c:o~ Cb:ri..U wbo worked on -.y _t~ rela1:ed to tM aubjeot; of 'th.1. CClDb:act and. ~ an "cnme:nhip iDt.J;ut" ~tituUnq 3' or -.ore or tM ~Z'1Ihip in the aboY. n-..d "tin". Name Consultant --- - -~.,------------_. - ---~_.~----- -------.-...---.- ------ CERTIFICA 1'E I Certify that all information provided is true and ,-orrect as of the date of this statement, that I have not knowingly withheld disclosure of any inform<lti.on requested; and tl\&t supplemental statements will bE! promptly submitted to the City of Corpus Christi, Texas as change$ occur. Certifying Plil"l;Ion:__~ (Type OJ; Printl Title: Slgnatur~ of Certifying Person: Dat@; kV1~ ~I<<)P05lU. rollH PAGI 14 OF 15 -'DDDDtII NO. 1, Ateaabaent )to.f hge 14 o~ 15 iP d '1,~ FHJ2 3'; 1 06 8:15PM; Page 42/42 DeFIN,TIONS Ill. "eo.ro Member'. A Ill8n1b8r of any board. commission or committee appoinl8d by the City Council of the City of Corpus Chrtstl. Texas. b. ~. Ani person employed by the CIty of Corpus Christl. Texas, either on a fuU or part time basJs, but not.5 81'1 independent contr8c!Dr C. "FImI", My tntity 0f*1lIlId ror 8COIlOmIC tIin. 'Mhether ~, industrial or ~ end Whether ~ 10 produce or_. a product or aeMce, ~ but not IImiI8d to, entIII8s apefa'" In the form of 80Ie ~, 81 ~ P8f'1Cn, P8ttner8hiD. c:orporaIfon, joint sb::k <Dnpeny. Joinr venture, ~ or trust and.".. Whrctl. for purposes of taxaliOn. are tr1Mded .. non-proftt~. d "OnIciar. The Mavor. rnemt.ra cAlhe CItr Coundf, City Mal , n.r...... City MnIaer. AsaildInt City Managers, . oep.tment and ~ H-. and MunicipBl Court Judge$ ~ thiatY~ COtpus CRriSti, T... 0, "OMIenIhIp 1ntef8sr: 1.8&*.. or equitable Int8rat. whether aatuIIIy or ~ held. in 811nnj ~ When suc:h In.... iIJ held ~., agent, trust, .... Of holding tiIntIty; ~ h8Id" ... m hofcIng oroontrol l*bIIIhId through votin(i1rWtl. proxies or spedat terms of \'VI1fure or PIIrtnersh~ &gn!gnenla. 1. "ConIuII8nr, ~ persona firm, SUCh .. engineers and .-d", hm.d by the City QI ~ Christi for the purpoIecA~~ancf~. ~ilJedI ~ I\Ol"OSAL FOM PA(;lo: 15 OF 1 S ADDBNDf.Il( NO. 1 A~taobII_t; No_. Pap! 15 o~ 15. F E I), L PRO V I S ION S S [=-' H: I F CAT ION S AND F (: R M ~) C F CONTRACTS F' 0 R AND BON D S SOUTHS IDE RATER TRANSMISSION MAIN PHASE 5 RODD FIELD RD. TO WHITELEY DR. December, 2005 PREPARED F'OR' ,~- .__._-_..~~~ ~ -- - - - - Water Department City of Corpus Christi P O. Box 9277 Corpus Christi, TX 78469-9277 (361) 857-1881 ~~ _....."','\:\\ --:\t Of T.' l :~"\~.........t~",- ..'tl ,.., ~. * '. ~ ~l "* ..' ". iC h ,: . ~ ~ L*: "*'i. ~...:.. ........ .... ........:.... "- if. MARKA. MARONEY ~ l.-............... ....... .......~ l: .-.)'. .~. .'15 ., 'I ~... _'-' ~ ~, ~...fI'QIt; . ~ /' I.l1tlf~~a!. t~ J./1b/07 V" \, ~~\:N ~,~- \'Z4 r Ian lJc;.,.. 0, Aqdre.vs I: .:. ~"=\'. Jl I,,' II URIIAII ENGINEERING ~. 30x 6j~~ CORPUS CHRISTI, TX 78466-6355 fho"e ['0 hl/H'.,..JIOI FAX 361/854-6001 [I f.:. .Jr.; No. 33760.A2.05 I PRO,jECT NO: H3jl I DR1\W 1 NG NO: WTR-; 4 ~ iRf" : eel SOUTHS IDE WATER TRANSMISSION MAIN PHASE 5 RODD FIELD RD. TO WHITELEY DR. Table of Contents NOTICE TO BIDDERS Rev 1 "'> NOTICE TO CONTRACTORS - A (ReVlseel Sept 2000) fnSlll anc'E' Replirem{'nt 3 NOTICE TO CONTRACTORS - B p, sed '?/S/GO Worker,.; Compeni;at ion Pro J('C! For Goverrmc'Jt CoveragE :~n tit: :i (: s For Building or Construction PART A - SPECIAL PROVISIONS A 1 A 2 A 3 A- 4 A-5 A 6 A 7 A 8 A 9 A 11 A 1 A 1 A 1 A lei A l' A 1,c A 1 A Ii-, A-l'i A 2" A 2 A 2 A 2 A 24 A -2" A- 26 A--~! A 28 A 2t:f A 3., A r A 3 A 3 A 34 A 3 ' A 3L A 3 rimeUld Pac' of Recei '( i I1CI Proposals/Pre Hid Meeting Detu1Lt l()n:~ aJid .I\bbrf'v I,ll ,ns lieser-cpt Oli 0 proj e( t Method ()t (\'Na: d Items to bf Submitted w tL Proposal rime ')f Complc,tion!LJquldated Damages \vorkeI:'s Compeflsation Tn,;uJ dnce Coverage Faxed Proposa s Acknow! edgmen' of Ad(Jendd Wage Rates IRevised '/;5/00 Cooper-allor w th Pub! ic l\:wncies RC'Jised /'J/OO) MaintenancE 01 Services Area AcceSi_' and Traff j c C',)[ltrol Construct iun Equipment ~;pi Ilage and Tracking Excavat:on and RemOVals Dispo~;al/Salviige ()f f'.1atr r }is Field Office Schcdu 1 ,~o and ,:equcncc 01 "ellSt ruet ion ':onstl'uct ion l'r-oject Layout and Control Testing and C~r-tifiC'2tinn Project Siglls Minor] Ly; Mi nOt i t,y HusiIles~' Entcl(pl'i se Part] C Lpation Policy (Revised iU/98) [nspe(tiCHl Recuir-ed '~r-:-~v';~---:(i 7/r_,/OC ,)urety Bonds -Sales- 'h-'-K 8)(Cmpt;oR NO LONGER APPLICABLE {6/11/qa) SupplJ,mental insurance I-ieqdir-ement~t~; ~ibil i-4=--y-f-B-r--Bama+re .: ~a-i-ms (Not Used) ':on,;iderdtioni for ConLld',~ Award Clnd Execution :ontractor's ~leld AdminIstration Staff Amended 'Consi deI'at ien f ':ontract" Requirements !\mended Pol ICi on Ext r d Wor k and Change Or-ders ,"mended 'Execution of COn"rdct" Requirements 'and it ions )f Work :)recedence,}f ,-:ont ra,= DO{~Ulnents "ity Watf't- Far lit:es Spt,,'i':ll Requirements )th",'r SubmittaLs '\mended ")\Llar:'Jement -lnd ,'barge for Water Furnitihed by the City" T\ '8 Pr- ~'f- A. 0 ^ -! 1 ,~ A- ,2 A- .13 A-H A-IS A-46 I\.- 4 7 A-18 A ~9 A- ',Q A-',l A- ~-12 A- ',3 A- ',4 i\ - L; S A- ',6 A-I7 A-,)8 A-',y A-60 A-hi A f2 Worker' ,3 Compensation Coverage for Building or Construction Projects for ';overnme:,t Ent i'- ies Ge-rti-€ H'dte-.)E--~hXftt?y- an4-F'+Ha.l- A~aft€-e (Not Used) Amendment to Section B 8 r,; Part ial Est imates Ozone Adv.LSOtY OSHA Ru le~; & Regula: ions Amended Indemnification & Hold Harmless Chanqe Order; (4/26/99) As Bui I t Ilimpnsions and Drawings (7/S/00) Disposal of Highly Chlorinated Water (7/5/00) Pre Construction Exploratory Excavations ('1/5/00) )verhead Electrical Wires (7/S/001 Amend MaJntFnance C;uar3nty" (B/24/0DI Technical Special Provisions Additional Time of Completion/Liquidated Damages Information Related to Right: of -Way and useE Permit Acquisition by the City Contaminated Soi 1 f:; Pences Protect lOr. at Public and Private Property Securit} Accesf; Roads Parking Noise ContrOl Dust Control Temporary Drainage Provislons Dewatering '::'ul tura I Rese.urces PART B TECHNICAL SPECIAL PROVISIONS GENERAL PROVISIONS PART C PART S 05020 0210'10 02:>0: ;' 025404 PART T FEDERAL WAGE RATES AND REQUIREMENTS STANDARD SPECIFICATIONS welding 1 roj eet Si gW3 Trench Safely for Excavations Aspha 1 t~;, Oi 1 sand Emuls ions TECHNICAL SPECIFICATIONS GBNER~~~EQU~~EMENTS 010 LJ Equipment Duc~umentation 01560 Storm Water Pollution Prevention SITEWORK 0204C 02082 022 ~ 022D4 023 --. 0232C 02321 02340 C~'otechni ca 1 L nvest iga t ion Plecast Concrete Manholes Ur ility Easprnent Clearing and Restoration U teh Cleaning and Shoulder Restoration Excavatiun and Backfil I for Utilities U ility Backfill Materials C'ment StabJlized Sand R ,ring and Cdsing Roadways and Railroads I 2 4 2 2 ,1 2 2 2 2 2 .2 02 ,2 02'.2 02'.2 02 ',4 02 L,4 021,1 021.,11 02,,2 021,4 0262, ()280, 0280" CONCRETE 0310 03)Oi 03 0 0340C FINISHES --...-- - 09<)1 19'J6 (uen ,::'u in,] ,,,nd aSlng 'T mnell1q alld Cas no Roadways., Utility Crossings and F lill.oals llctllt' fI'l!, PipE" j[]ci F'itt:lngs '~~i .:1 tel J j nt s f,,'drust,l! i (' Test inl; of Pipelines eel P_PE lIld Fittings for Lar<::je Diameter Water Lines F~movin'l .3Ild Replacing Pavements, Curb and Gutter, I ci vewa'ls and Sidewal k ] lme Stibil17.ation FLexjbl,~ F3a~3e - Cl11cIle I'll yure' tliJIle Coat ings ')n Steel or Ductile Iron Pipe Folyethylenc Wrap Frime Coat (Asphaltic Material Only) Hot Mix Asphaltic Concrete Pavement (Class AI har Wrapped Steel CylInder Pipe l"Jly-vinyl Chloride Pipp and Fitl ings for Water Lines (,,~otext L Le I 'lsta 11 lti on of Watpy Pipe l'urbidii y Curtain ~eeding r {Jdding l 'oncret.~ For mwork Reinforcing Steel Normal Weight Aggregate Concrete Concret,. Structures painting C'orn:>sion COIlttol Test St ations 1311 SPEC1AL CONSTRUCTION Cathodic Protect.lon for Pipelines MECHANICAl, -_. --- ._~ 1506 L5 0< i510 i5 0/; 15 Or ELECTRICAL __n_ _ 16061 APj.JENDlX 11 /\Pf'ENDIX H APPENDIX C ~lscelldneous Piping ~Lscelldneous Valves r:ltterf y Va j ves ( ~it_e \/a LVPEj r, ,r Rcl(~ase Valves ,';lint B<Hldinq and Electrical Isolation , LO MIS--.ELLANEOUS EA~;EMENT (PIPELINES) ME 20040047 DEPARTMENT C)I. THE ARMY PERMIT NO 23655 SPECIAL PROVISIONS AND CONTRACTOR OBLIGATIONS REPORT NOTICE TO BIDDERS NOTICE TO BIDDERS ~ed h'd 'ropCSdc s aldresSE'd to the Ci ty of Corpus Christi, Texas for: SOU'l'HSIDE WATER TRANSMISSION MAIN PHASE 5 Rodd Field Rd. to Whiteley Drive, ~onsjsts of excavat~n dnd backfilling, installation of approximately 5.57 mile: 4)" dlamet~r, corrOSIon protectIon, cathodic protection, valving, :ayo DE' Use c;::o5sinq LunneU [19 dnd borinq, and miscellaneous items of work requi n tc :omp),~te the project in accordance with the plans, "pee: r at 1 on~, aT,d ont rat t do[:uments, will be recE-lved at the o'Ei,,, ,:;f the CIty Secretary until 2:00 Wednesday, January 25, 2006, and then publicly opened and read. received after closing time wi ) be returned unopened. p.m. on Any bid 1:\ pre bId meeting i scheduled tor Tuesday, January 10, 2006 beginning at 2:00 p.1Il . The pn;-bid meetlng will convene in the Utilities Building Conference Room, 5352 Ayers Street (corner of Holly Road and Service Center Drive) and wi 11 he ,:onducted by the Ci ty of Corpus Christi. The meeting will II ludei rev ewd the project scope followed by a question and 1nswe ;essior A bicj hmd in t h(, amount )f 5% of the highest amount bid must accompany '''ach pToposal ["ailure tJ prcJvide the bid bond will constitute a non- responSive prupo:;al which will not be ':onsidered, Failure to provide r'equi red per formanc, and payment bonds for contracts over $25,000.00 will result n focfeiture of Uw 5% bid bond to the City as liquidated damages. Bidder '.'~ plan depos; t is ';ubject to mandatory forfeiture to the City if t>iddj'lq loc-ument:::; au' not returned to the City within two weeks of receipt f bids Plans, prOpOSd.l forms, spe,'j tlcations and contract documents may be procured from Lhe Cjty I-:ngineer upon a deposit of One Hundred and no/lOO Dollars ($100.001 a~ a gUdcar:tce of their return in good condition within two wee ks of bi d dat e. DCh;ument s can be obtained by mail upon receipt of lD ad,ji' Lonal ($10.00) which L; d non'retundable postage/handling charge. The bid,}"r l~, hereby notified that t.he owner has ascertained the wage rates which pcevdll nth.' localit,y' n which this work IS to be done and that such waqe scale i s;et out 1n the contract documents obtainable at the ff ic;' (,t the Ci ty Engineer and the Contractor shall pay not less than the wage rates so shown for each 'T aft or type of "] aborer," "workman," or "mechan, ," empl')Yf~d ,)n thic; project. The C i. t Y reserVE'S the r 19ht to reject any or all bids, to waive rreguLlcities ind tu accept UHc bid which, in Lhe City's opinion, seems mosl id\'lOt aqeouo' t( the C c t YUld in the best interest of the public. <ITY OF CORPUS CHRISTI, TEXAS is/'AngeI R. Escobar, P_E. Director of Engrg. Services s/ Armando Chapa City Secretary RevlS"-'O S/cO NOTICE TO CONTRACTORS - A NOTICE TO CONTRACTORS - A INSURANCE REQUIREMENTS Revised September, 2000 A Certificate of Insurance indicating proof of coverage in the following amounts IS required: TYPE OF INSURANCE MINIMUM - INSURANCE COVERAGE Property Damage ~--- INED SINGLE LIMIT INED SINGLE LIMIT --_. WITH THE TEXAS WORKERS' ACT AND PARAGRAPH II OF INED SINGLE LIMIT INED SINGLE LIMIT ED -11 and Supplemental Insurance Requirements D -11 and Supplemental Insurance Requirements D 30-Oay Notice of Cancellation required on all certificate s Bodily Injury and Commercial General Liability including: 1 Commercial Form 2 Premises - Operations . 3 Explosion and Collapse Hazard ! 4 Underground Hazard ! 5 Products! Completed Operations Hazard ! 6 Contractual Insurance I 7 Broad Form Property Damage I 8 Independent Contractors 1~.l Personal Injury r- ---------.-...-- ---.--.. -- m [' AUTOMOBILE L1ABILlTY--OWNED NON-OWNED OR RENTED -.......-...----...--.---.. -'.,.-..-..,-.-. -..--, -,,_. ._-_._._---- ; I WORKERS' COMPENSATION j , i I_Erv1PLOYER~.~ LIABILITY EXCESS LIABILITY $2,000,000 COMB $1,000.000 COMB WHICH COMPLIES COMPENSATION THIS EXHIBIT $100,000 $1,000,000 COMB PROFESSIONAL POLLUTION LIABILITY, ENVIRONMENTAL IMPAIRMENT COVERAGE Not limited to sudden & accidental discharge; to include long-term environmental impact for the disposal of contaminants $2.000,000 COMB REQUIRED X NOT REQUIR BUILDERS'RISK See Section B-6 REQUIRED X NOT REQUIRE INSTALLATION FLOATER See Section B-6 REQUIRED X NOT REQUIRE Page 1 of 2 )The City of Corpus Christi must be named as an additional insured on all coverages except worker's compensation liability coverage OThe name of the project must be listed under "description of operations" on each certificate of insurance. -.:; , ~ OFor each insurance coverage, the Contractor shall obtain_an endorsement to the applicable insurance policy, signed by the insurer, providing the City with thirty (30) days prior written notice of cancellation of or matenal change on any coverage The Contractor shall provide to the City the other endorsements to insurance policies or coverages which are specified in section 8-6-11 or Special Provisions section of the contract. A completed "Disclosure of Interest" must be submitted with your proposal Should you have any questions regarding insurance requirements, please contact the Contract Administrator at 880.3500. Page 2 of 2 NOTICE TO CONTRACTORS - B NOTICE TO CONTRACTORS B WORE? 'S CC:.:?E:,SATION COVERAGE ::-OR BUILDING C? C2NSTRUCTION PROJECTS F'OR CCVE?",NMENT ENTITIES ,. ~xas law r equi.::es t.ha:::. ':-.ost contracc.ors, subcc:-:c.~actors f and )the~5 ;~oviding work or serv:ces for a City building or construction prc~ ec ~ust be coverecJ. by worJr.er' s compensation insura~ce. authorized sel~ - :sc.rance. O' en app:':;ved worke~' s compensa~:'c:l coverage agree!":'ec:t:. ~ven ~f Texas law does ~ot require a contractor, subcontractor or others performing project services (including deliveries to the job slte) _~ provide 1 or the 3 ~orms of worker's compensac.ion coverage, che C.t': will require such coverage for all individuals providing work :>r se~': lces on this p,::oJ eo at any time. includi:lg during the :nai,.::C:-.e.nce guarancy ;:>erioc :-:otor carriers .....hich aye required to reg:s e- wlth the Texas Depar=~enc. of Transportation under Texas Civil Stat~ces Article 6675c, and which provide accidental insurance covera~c under Texas Civil Statutes Article 6675c, Section 4(j) need not ;::0"1de 1 ot the 3 forms:f worker's compensation ceverage. ~he Contractor agrees :: comply with all applicable provisions of T'.:xas AdministY.:'atl ve code 7itle 28, Section 110.110, a copy of whict .5 attached and deemeci ~~corporac.ed into the project contract. Please:ote that under sect~cn 110.110: certalil language ~ust be included in the contractor's Contract with the Ci~y and the Contractor's co~tracts with subcontractor~; ana others providing services for the Project. the :::ontr2.ctor __5 r'equired to submit '.::0 the City certificates of c:)verage for its employees and for all subcontractors and others providing services on the project. The Contractor is required to obtain and submit updated certificates showing extension of coverage during the Project. and the Contract.or i..) ::equired to post ehe requ::'.::::-ed notice at: the job site By s' <;~,~ng chis Ccntrc.ct, :he Contractor certlfies that:':' will timely com;:: ..Jith these Not:c:, lJ,':-cntractors "3" requirement.s. NOTICE 70 CONTRACTORS . 8 IRevi~ea 1/13/9BI p~ge 1 of 7 8/7 (98 .. ...~\... ... "-.l....... fitle 28. ~Sll~-\~CE Parr II. TEX..AS \'\.ORKERS' CO\IPE!'lSA TION COMMISSION Chapter 110. REQCIRED NOTICES OF COvcRA.GE Subchapter B. E:\1PLO'icR NOTICES ~ 110.110 Reponin!;! Requirements for Building or Construction Projects for Governmental Entities (a) The follov.ing words and terms, when used in this ruie, shall bve the following meanings, unless the context cie:rrly indicates oth.erwlse T e:ms not defined in this ruie shall have the meaning defined in the Texas Labor Code, :r- so de5nei.. (1) Cer1lii~te oIcoveRge (ce:-:ui<24eJ-":"" copy ofa cei'"..liiC3.te cfs.surance, J. cenmcate cfam..ooriry to seu-insure :ssued by the ccr:uni.ssicG, or a workers' ccmpe:1Saccn coverage agreement ('!WCC-SI, T\VCC-82, TWCC-83, or TWCC-S4), showing statutory workers' compensation insurance coverage for the person's or entirys employees (inciuding those subjecr to a coverage agreement) providing Services on a oroject.. for the duration of the projecr.. (2) Budding or ccnsuucion-nas the m~.i.'1g defined in the Texas L3.bor Code, S 406.096(e)(l). (3) Comnc.or-A person bidding for or awarded a building or construction project by a governmental enoty (4) Coverage--Workers. compensation inS'.ll"aIlce meeting the stannory requirements of the Texas Labor Code, S 401.011 (44) (5) Coverage ~gree::::1e:1t-A wrine~ J.gree~ent on form nVCC-Sl, form TWCC-S2, form nVCC-S3, or form TWCC-S4 filed with the Texas Workers' Comcensatioo Commission which establishes a , . relationship between the parties for purposes of the Texas Workers' Compensation Act, pucsuant to the Texas LWor Code, Chapter 406, Subchapters F and G, as one ofemployerfemployee and establishes who will be responsible for providing workers' compensation coverage for persons providing services 00 the project (6) Duratioo or-the prOJect-Includes L~e time from the beginning cfwork 00 the project until the work on the project has bee:1 compieced ;o...;d accepted by the governmental entity.. (7) Persons rroVlciing services on Lf-Je proJe~ C'subccmraClor~ :..-: ~ 406.096 of the Act)-With the exceptlon of oersons ex:!uded under suosections (h) and (i) of this section, indudes all persons o~ entIties pe:ionmng all or part of the services the contractor has undertaken to perform on the projec<..... regardless 0'- wheLfJer lr:2.t pe:son conuac.:ed directly with the contractor and regardless of whether that person has employees. TIjs lOciudes but is not limited to inde;Je~dent contractors, subcontractors. leasmg companies. motor carriers, owner-operators, employees of my such entity, or employe~s ~f anv e:1t1ty fi.:rr.ishing persons to perform se:vices on the projecr. "Services" includes but is not li......~ted hltp v.,.vw sc,.SIJ.te:".c:Jtac!23!LIJI }O/B/lIO 1;0 html ~IOTICE TO CONTRACTORS - - Revi.sed 1/13/98) paqe 2 at 1 817/98 :::'S T Page 2 c:-:) ,(J [' .~ ~'Jlm; 0; Je:,,:',e:-1ng e~UlOrr.e:J:: or -:::::c:-::tis, cr ~r:::\lding labor, ~,;L.SpC;:~::cn. or athe; ::;:',::::.:: ~)'OIC-__ :':~;vJces c,es not l;',~;:":::e actl".-;:::e~ c;:-.:-eiated to the proJe:::. o:lcnas e, '::~ ':::>:100!5, :.z.c:e su['piy cc:.:'.'enes, "-__..: c~!iverv c~r- ::or:aole toue::s, ,e:--~, !OC (8) Prclc-:;:--",-,ciudes we cr::"1sion of:ill se[YIces r'::~:ed [0 a ct.:~ci..'1g or construcTion c;:;:::;-act for a gove~.,~e:::~ ~:1rJt)' (b) Pre'v1oir.:; or causlIlg to ~e proVlded a cerufica:e O! coverage t:'ursuant to this rule is a represc:::2.:';,:::: DV the insure~ :hat all employees cf :l.e insured who are providing services en the proJcc: ~e C::', ered by worKers' compensation coverage, that the coverage is based on orODer reporun~ of c;J..Ssmcation coces and payroll amour.::s, and that ail coverage agreements'ta~e been filed with the a~::rcDriate lIl5urance carrier or, in the case of a self-insured, with the conunission:s Division of Se!.f. Lr:.s:...r2.:':ce ReQUiauo!'~ ?rovlding false or misi~ding cerLilicates of coverage, or railing to provldc or calmam reqUlre:i coverage, or failing te re?ort any c::.ange that materially aiIe~..s the proVlsion of coverage may subject the contractor or other person providing services on the project to adminisL-a:::'.'e 8enaIties, :rirninaI penalties, civil pe::ziues, or othe: c;'v-il actions, (c) A govei.'.:::e:JtaI e:1titv 11-.2L enters into a buildi.~g or consuuc-...:on contract on a projec:: shall: (I) mc:ude U1 tJe bid SpeCllC3.Uons, all the prOVlSlons of paragnpn (7) of this subsecricl1, l:sing the language re:::uired by paragraph (7) of this subseC:l::U: (2) as pan o( L'1e conrrac-.., l:sing the language required by parag:rc.ph (7) of this subsection, require the conL-ac::or to perform as required in subsection (d) of this section; (3) obum zc;n the contr3.c:or a certificate of coverage for each person providing services on the project, ;;rior to that person beginning work on the project; (4) obtam ITem we con~acror a new certificate ofwverage showing extension of coverage: (A) before tr.e end of the ct:.r:'ent coverage period, iF Lie contrac":or's current certificate of coverage shows that tb.e coverage per:od ends dwing the duration of the project; and (B) no rater:!-...m seven days a.4:er the expiration of De coverage for each other person providing SefV1ces on the project whose current certificate shows that the coverage period ends during the duration of the project; (5) re~ ce:micates of coverage on file for the duration of the project and for three years thereafter, (6) provide 2 copy of the ce:-ificates of coverage to the commission upon request and to any person entitle~ ':; them oy law; arld (7) use [:Ie ]2I.~-u2ge ccnt.lli1e:i lil the followmg Figure i for bid specmcations and contrzC:S, ';.ithom any additional words or cnanges, except those required to accOInmodate the specific document in which thev ere ::omained or ,0 impose stricter standards of dOCll::1emation: T28Sl10110(c)(7) tbl http://\<"'^'\'\'5()SS~2:e[xuSI.,1c'2S/Il; ] ] 0113111 0 110 htlTJ NOTICE TO CONTRACTCRS - 3 Revi5ed 1/13/981 paqe J at' 1 8/7/98 _ I.' 10 II 0 Page j of 6 :) i\ contractor snziL ;) proV1de coverage for its empicyees providing services on a project, f:;;- t.~e duration of the projec~ ::2Sed on propei re?oning of class~c:::'::Qn codes and P;?jTCU amounts a..-:c E::g of any coverage ::greemems; ,2) provide a certificate of coverage snowing workers' corn~ensation coverage to the govenunemal ~:lory prior to beginni:lg work on :he ;:roject; (j) provide the gove:nmentaI enti~.., ~~or to the end of the coverage pericd, a new certificate.of :;Jverage showing extension of ccvenge, if the coverage period shown on the contractor's current :errificate of coverage ends during the duration of the project; (4) obtain from each person proviciing services on a project, and provide to t."le governmental entity: (A.) a certificate of coverage, prior to that person beginning work on the project. so the governmental e:loty v.ill have on file certificates or coverage showing coverage for all pe:sons providing services on :,-.e prOlect~ and (3) no later than seven days after :-ecei;n by the contractor, a new certificate of coverage showing elCtension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the project; (5) retam all required certificates of coverage On file for the duration of the project and for one year thereafter, (6) notlly the governmental entity in Vlriting by certified mail or personal delivery, within ten days after the contractor knew or should have y..nown, of any change that materially affects the provision of coverage of any person providing se..-yj~ on the project; (7) post a notice on each project site informing all persons providing services on the project that they are required to be covered., and stating how a person may verify current ccve.--age and report failure to provide coverage. This notice does not satisfy other posting requirements imposed by the Act or other commission rules. This notice must be printed with a title in at least 30 point bold type and text in at least 19 point normal type, and shall be in both Fnglish and Spanish and any other language common to the worker popularion. The text for the notices shall be the following text provided by the commission 00 the sample notice, without any additional words or changes: REQUIRED WORKERS COMPENSATION COVERAGE "The law requires that each person working on this site or providing services rdated to this construction project must be covered by workers' compensation insurance. 1":-js includes persons providing, hauling, or delivering equipment or materials, or providing labor or transportation or o~er service related to the project. regardless of the identity of their employer or statuS as an employee. "Call the Texas Workers' Comper..sation Conunission at 512-440-3789 to re~eive information on the legal requiremen[ for coverage, te verify whether your employer has provided the required coverage, Of to report an employer's failure 10 provide coverage" ~ttp:IJwv,."WsOS_$tate_tx uS/tad28IIIJIIO/BIlIO.IIOhtml NOTIC$ 7~ CONTRACTORS - B Rev1~ed 1/13/981 l'a.qe .( 0' 7 snl98 ::'S T r. 1 C page 4 or b (8) c. ::: ~~c::.;2il\' :e8~:::; '2::::: ::;e:-sC~ \\nlll \,'rocr.. :: comrac::; :: ::~c\.;cie services c:-: .1 ;:roject to: (A) prO\10e coverage :)2..Sd on prv~er re::'o~g o{ dassificauon caces 2.!1d payroii a.-::oums and filin'! of am coverzge agree~e-::s for 2i d its eXFieyees provicii..'1g se""1Ces en the projec:. far the duratio; cfthe ~[oJec:; (B) prc'.1de a ceru5c.:.;:e .,' :overage to tne CO;J.:.~ctor prior to that oe:-son begirull..~g ',^..ark on the pro] c:;: (C) L:1ClUCe ill all con:.r-acs:o oro"loe se"nces or. we proJec: ;:je ianguage in sUDse::-..:cn (e)(3) oftrus section (D) previde the cont.r-ac::::, prior:o the end of ::he coverage pe:-ioa, a new certiiicz:e of coverage showing extension or' coverage, u the coverage period shown on the current certifica:e of coverage ends during the duration of the project; (E) obtam from each 0&':;:- ::erson with whom i: comrae:s, and provide to the con:r2.c:or: (i) a ce:Uficate of coverage, prior to the orner ~e:;;on beginrling worK on the proje<::; :!--rd (u) poor to the end of the coverage period, a new certificate of coverage showing exte::sion of the coverage period, if the c.overage period shown oa the curre:1~ ce:-tmcate of coverage ends during the dw-ation or the projeCt; (F) ret2ffi all required c~:-.ificates or coverage en file for the duration ofille prajee: a:~d for one year there:!...1. er; (G) notify the governmental entiey in writing by certified mail or personal delivery, v.ithin ten days after the person knew or should have known, of any change that materially affeas the provision of coverage of any person providing services on the project; and (H) coorracrually requir e ~ch other person w1t.U whom it cantrac:s, to perform as required by subparagraphs (A)-{H) of this paragraph. with the certificate of coverage to be provided to the person for whom they are providing services. (e) A person providing services 00 a project, other than a contractor, shall: (1) proviae coverage for its employees providing services on a project, for the duration of the project based on proper reporung of c1assmcation coaes and payroil amounts and filing of any coverage agree:::ems; (2) provide a certificate o{ cove:-age a.s requird by its contract to ?rovide services en the projec, prior :0 beginning work on the projet:;L (3) h2.ve the foilowmg language in its contract to provide services on the project: "3y signing this contraCt or providing or causing to be provided a certificate of coverage. the person signing this contrac:. is representing to the governmental entity that all employees of the person signing this conn .:c: who v.:ill pro'vloe services on the project vtiU be covered by workers' compensation coverage httpi/"'-"VVv' SOS.state txlsltad2SlilJ Il O/BIl1 0.110 hun! NOTICE TO CONTRACTORS - B Revi.sed 1/~J/9BI Page 5 c f 7 8n/98 ~O .I.:'" .,) . ~.,.; rdgeJOIO tor t. ~ ,.::.:.;-atlon of;1:e pro.iect, that the c~':erage Mll be ~~ed on proper reporting of classification codes aIle payroU 2...::0UnIS. and that all coverage agreer:1e:::s '.viiI be filed with the appropriate insur~ce czrrier or, :.:: the case of a self-ir..screci. 'Nith the commission's Division or Self-Insurance Regt;1aoon. Proviciing false or misleading i.-.:ormation may subject the contractor to administrative peD2..ities. criminal Fe::alties. civil penalties. or other civil ac-..:ons." (4) prO'l1oe the person for whom it is providing services on the project. prior to the end of the coverage period shown on its current ceruncate of coverage, a new certificate showing extension of coverage.. if the coverage period shown on tile certificate of coverage ends during the duration of the proJe~; (5) QOtalll from eacn person providing se:-vices on a proje~ t:nder contract to it, and provide as reqUJ.reC by its contract: (A) 2. certificate of coverage, prior to the other person beginning work on the project; and (B) prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period. if the coverage period shown on the current certificate of coverage ends during the duraeon of me proj~; (6) retaUl all required cer"...iiicates of coverage on file for the duration of the project and for one year theremer; (7) nowy the goverr1;Ilental entity in writing by certified mail or personal delivery, of any change that materially affects the provision of coverage of any person providing services on the project and send the notice within ten days after the person knew or should have known of the change; and (8) contractually require each other person with whom it contracts to: (A) provide coverage based on proper reporting of classification codes and payroll amounts and filing of any CDverage agreements for all of its e."':lployees providing services on the project. for the duration of the project; (B) provide a certificate of coverage to it prior to that other person beginning work on the project; (C) include in all contracts to provide services on the project the language in paragraph (3) of this subsection; (D) provide, prior to the end of the coverage period, a new certificate of coverage showing extension of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration cr the project; (E) obtain from each other person under c:::ntract to it to provide services on the project, and provide as reouired by its contract. (i) a cemncate of coverage, prior to the other person beginning work on the projec~ and (ii) pnor to the end of the coverage period. a new certificate of coverage showing extension of the coverage period, if the coverage period shoVlll on the current cenificate of coverage ends during the http://v.rv.rwsos.state:xusltacl28/II1110/B1l10110.htm1 NOTICE TO CONTRACTORS - B Revi$ed 1/13/981 Page 6 of 1 817/98 Page 6 of6 ) t:\ :J dUrai.lOC C{ ::1e GontraG: (F) relam ail ;'ec:Ulrea 'e;-:::::~:es coverage on file for the duration cf ~he project and for one year ther~,-itc; (G) noufv the govemme:::ai e::~ry :.n wnring by ce....tified mail or pe....sonai delivery, within ten days after the person knew or should have known., of any change that Inate:-:ally affects the provision of coverage of any person provicing services on the project; and (H) conrrac:uaily requu-e ~c:: pe:-son with whom it contracts, to perform as required by this subparagrapn and subparagrapns CA)-{G) of this paragraph. with the ce:Uficate of coverage to be proV1ded to the person for wham they are providing services. (f) If any provision of this rule or its application to any person or circ.l:nStaIlce is held invalid, the invalidity does not affect other provisions or applications of this rule that can be given effect without the invalid proVlsion or aoplication., and to this end the provisions of this rule are declared to be severable (g) This ruie is applicable for building or consuuction contractS adver-jsed for bid by a governmental entity on or after Septemoer l, 1994. This rule is also applicable for those building or construction contracts entered into on or after September 1, 1994, which are not required by law to be advertised for bid (h) The coverage requirement h"1 this rule does not apply to motor carriers who are required pursuant to Texas Civil Statutes, Article 6675c, to register with the Texas Department of Trans po nation and who provide accidental ir.surance coverage pursuant to Texas Civil SUtutes, Article 6675c, 940). (i) The coverage requirement in this rule does not apply to sole proprietors, partners, and corporate officers who meet the requirementS of the Act.. ~ 406.097(c), and who are explicitly excluded from coverage in accordance 'Nith the Act, S 406.097(a) (as added by House Bill I 089, 74th Legislature, 1995, S 1.20). TIlls subsecrjon applies only to sole proprietors, partners, and corporate executive officers who are e.,xduded from coverage in an insurance policy or certificate of authority to self-insure that IS delivered., issued for delivery, or renewed on or after January 1, 1996. Source: The provisions of this S 110.110 adopted to be effective September 1, 1994, 19 TexReg 5715; amended to be effective November 6, 1995,20 TexReg 8609. Return to Section Index http://www sosstate. tx.U :;itaci2SIlIl II O/B111 0 llOhtml NOTIC~ "0 CONTRACTORS - B Revi~ed 1/13/981 paqe 7 of 1 gn /98 SECTION A SPECIAL PROVISIONS SOUTHS IDE WATER TRANSMISSION MAIN PHASE 5 RODD FIELD RD. TO WHITELEY DR. SECTION A - SPECIAL PROVISIONS A-l~~e and~~~~~_o! Receiving Proposals/Pre-Bid Meeting Sealeo proposals wIll be received in conformity with the official advertisement inviting bids for the project Proposals will be received in the office of the City Secretary, located on the first floor of city Hall, 1201 Leopard Street, until 2:00 p.m., Wednesday, January 25, 2006 Proposa]:3 mailed should be addressed in the follovJ; nq mannCl- ~ity ot Corpus Christi ~ity SecretalY's Office i201 j,eopard Street Corpus Chrlsti, Texas 18401 ATTN: BID PROPOSAL - SOUTHS IDE WATER TRANSMISSION MAIN PHASE 5 RODD FIELD RD. TO WHITELEY DR. l\ pre hi j meet in9 1; s'hedulecl for Tuesday, January 10, 2006 beginning at 2:00 p.m. The pIC bid meeting Wi 11 convene in the Utilities Building Conference Room, 5352 Ayers Street (corner of Holly Road and Service Center Drive) and will be conducted by the ci ty of Corpus Christi, The meeting will include a review of the project Co cope ! lowed by a question 'lnd answer session. No addil ,o~dl or !:.',::'parate_:'Jisit:...at ions wi I] be conducted bX the City. A-2 Definitions and Abbreviations - - Section 8 1 Df t he:;eneral Pc)vi s 1 ons wi I I govern. A-3 Description~~-.!'roject This project consists of excavation and backfilling, installation of approximately 5.57 mdes of 42" diameter, corrosion protection, cathodic protection, valving, Cayo Del Osu ,:rossing tunneling and boring, and miscellaneous items of work required to complete the proje"t in acce,rdancc with the plans, specifications and contract document A-4 Method of Award The bJ ls wi I I be '''Jiluated ba:;cd OJ! the availability of funds and in the following priority order: Base Bid 'A' OF Base Bid 'B', INDIVIDUALLY, It 1': the B 1 dde r " optlon te .; ubrn i t d bi d package for Base Bid 'A' or Base Bid Indicate "No Bid" on the proposal form if not submitting a bid for Base Bid 'A' or Base Bid 'B'_ Award wlll be bailed on th( lowest TQt<o!J of Rase Bid '/I.' or Base Bid 'B' INDIVIDUALLY The Ci Y reserJes the '0 accppl the [,id wLict In the t}l '.:-:,t :. n e rF~r~! n ight tel reject any or all bids, tu waive irregularities and HI th..: eil j ,.' opinion. is most advantageous to the City and tll,' puhl ; r Section A SP (Revised 9/18/00) Page 1 of 32 ~.l~rJat ion 01 Measuremeni. ~nd~paym~nt Water MaiL Pl~-,- Wate] Pipe we 11 bf> mea;;ured by the linear foot of pipe for each type Jnstalled, regardless of the depth. Measurement will horizontally along the centerline of pipe from center to center of rhis item includes but i;.; not limited to the following work: a. Trench E:xcavatip!l, including removing and disposing of existing unslutable soil, pavement, etc. b. Furnisbin'l and installing pipe (bar wrapped concrete steel cylinder plpe, due ile irJn pipe or ;;tee1 pi pe), concrete thrust blocking as specIfied in the plans and specifications and any other items required to complet-e the water system improvements in accordance with the C'ontract Documents that are not measured and paid for under another bid item Making an. connectiullc: to eXIstIng lines as required to complete the watel fc:ystem imp! ovements ready fOT use. d. Placing dnd compacting embedment and trench backfill furni shinq the select bedding material) . e. Grading and cleaning up of pipe trench and affected area. f. HydrostatIc testing, sterilizing, dechlorinating and flushing of completed Line. AU blow-off valves (in addition to those shown on the Bid Propo,;al) and taps required t:o test, sterilize and flush the transmissIon main g. Restraining joints Specifications. h. Furnish restoration of property of all disturbed areas as specified in t:he Contract Documents. Furnlsh corros iOD and ,:athodic pr otect ion of water I ine as per Contract Documents J. Furnish Storm Water Pollution Control as Documents k. Furnish traffic control 1. Pre construction exploratory construction per Special provision A-47. m. Demol it ior! and removal of above ground and below ground improvements wJ.thin pf.rmanent ea3ement according to Local, State and Federal ReguJat iOlls. n. Loading, hauling and unloading suitable excess material removed from the trench excavation to the City's property at the J. C. Elliot Landfill site (suitable excess materidl becomes the city'S property. The Owner shall decide what is :;u i table excess material). Providing final grading oj "toc kp led mater Lal to provide smooth grades and with maximum side slopes of L foot v-erllcal to 4 foot hori.zontal. Unsuitable and unwanted material, as determined by the Owner, shall be removed per Special Prov s on "-.-16 size and be made fitting. { including as called for In the plans and Technical specified in the Contract 2 Water P12e Fi ttings (including.e..lugs and blind flanges): Th{s-item" wi! Ibemeasu"r<,~d by each Indi-vldu-ci"l fitting-for each size and type listed (n the Propo:3al. This item includes but is not limited to the fo1.10wLng WOlK: a. Trench Eycavati on, I Deluding removi ng and disposing of existing unsuitable soil, pavement, etc. b. Furnishincj and installing the fitting (16" and smaller fittings to be wrapped i!1 pol yet hy 1 ene) . .>. Furnishinq and installing restraining Joints on all fittings as called for :n the plans and specifications. i. IncludE t:l," cost)f furnishing and instal i iny any adapter, tap, blow off valve eer special fitting required to complete the installation ready for use in t_he appropriate bid item ~. P acing aId eornpactinq backfil I ( ncluding furnishing the select bedding ITldt,Pl. i I) Section A - SP (Revised 9/18/00) Page 2 of 32 f Gradinq aid c~leal1inq up at pipe trench and affected area. ~utte~t iy rh s item and t.',TIK NC'k. Va ves and Vaults or Boxes: ^ ____n_____ ______n____ WI 1 be measured by each individual butterfly valve of the size nstllled_ Thi,; item includes but is not limited to the following b Fitrl1j~;hinCl and in::~t<J- a:ld spcci ied her eill, F'lrn lshinq and lnstalllllg valve 'faults or for on thE Drawings and specified herein, b')X'ct; "ha 1 match the finished grade_ Fdrnishinu and installing a concrete pad under each valve not enclosed in a vault Flrn lshinu and i nst ell i i ng gaskets and restraining joints on all MJ butterfly valves Pli'l lnq ard compilctinq hackfiil md t c i d 1 ) Gradlnq ar'd cLearnnq up of pipe trench and affected area. ing butterf '! valves a~ called for on the Drawings boxes with covers as called Top for the valve vaults or cL (,ncluding furnishing the select bedding f 4 S_Leel CaslIlg U!nstalL--'~I1Jy" Installed by Tunneling, Boring or Open Cut: This item wi 1 be measured by the linear foot steel casing installed by tunnel ing biring or open cut, The City has 170 LF of 66" dia. steel casing pipe;tockpi ed at the Staples Street Pumping Station. This item includes but is not limited to the following work: a Con! ractol wi 11 load, transport and unload 66" steel casing pi pe stockpi Ie" at the Staples Street Pumping Station (See location map, Sheet No 1) b Tunnel pits and tunneling or bore pits and boring. c. Instal ing (including welding and bolting and, when required, grouting) . . plpe casJ.lig. d, Inst a] lnq carrier p~pe where shown (carrier pipe is to be paid for under the water pipe line item) e. Sealing the ends of the casing. f, Furnishing and install ing carrier pipe spacers as described in the plans and Contract Documents. g. FurnLshinq and instal ling marker signs, vents, and test leaders at each end of ca"ing as specified in Technical Specifications or on Plans. 5 ~ee Lc:~~ll!9. ~Ils_ta}:J ed tly . 'I'unne,~_~~g,_~~r.l~~ .QEen Cut: This item will be measured by the linear foot steel casing installed by tunneling buring or open cut. This item includes but is not limited to the followinq work: a. Tunnel pits and tunneling or bore pits and boring. b. Furnishinq and insLalling (including welding and bolting and, when required, grouting) pipe casing. c Instal I inq carrier pipe where shown (carrier pipe is to be paid for under the water pipe line item) d. Sealln'] tIe ends of the casing. e. Furnishing and installing carrier pipe spacers as described in the plans and Cant rdet IlOCllment r; t Furnlshinq and instal ling marker signs, vents, and test leaders at each end of ca~ing as specified in Technical Specifications or on Plans. 6 Ai~ReJea,~('hamber, Surge Relief Chamber, Blow-Off Valve: This item wi 11 be mea~3Ured by'-'::;;;~h' indi;"idual installation_ This item include,;, bu' is not 1 ~mlted to, the following work: d. Furn shinu and installing transmission main Laps, valves, miscellaneous plp!m; v nt~;, nunhoiec;, elmJ LJuelrd posts (other than the guard posts 1 i st',d in the Bid Prnposal) required to complete the installation in a'~ccrdanc'" with the Contract Documents that are not measured and paid f,)r under anothel b "d : tem. Section A - SP (Revised 9/18/00) Page 3 0 f 32 b. Top of ch,nnbers and valve boxes shall match the finished grade, unless shown nthprwise on the plans .. Grading and cleaning up of installation and affected area. GuaJ::.d~ost~d_nd Met~_al_P~E>!- with_~~~: This item wi 11 be measured by each individual installation. This item include~', but it not limited to, the following work: .L Furni shinq and instal LLng post, concrete, sign and paint required to compJete the 1nstalJation in accordance to the Contract documents that are not measured and paid for under another bid item. Note that guard posts and signs required for air release and surge relief chambers and blow off alves are paid for under those bid items. o. Top of concrete footing shall match the finished grade, unless shown otherWlse ~n the plans Grading and cleaning up of installation and affected area. 1. Cuncrete F"mred inside .]uard post shall be domed for drainage and shall have- a .3mooth :ir:iscl ,j Cay~ Del (:Jso Water Main Crossing; This item will be measured by Lump Sum tor the Cayo Del Oso crossing by marine construction techniques. This item includes, but is not limited to, the following work: 'i. Provide all equipment and labor necessary to install 42" diameter water ma in by ,;tandard and marine construction techniques under the Cayo del Oso fn)m Station 75+38 to Station 100+15 as shown on the plans. D. Site preparation and access for Trench excavation, including unsuitable soil, pavement, etc. d. Furnishing and installing pipe, valves and fittings (all pipe, fittings and surface appurtenances, including carrier pipe, between Sta. 75+38 to Sta 100+]5 shall be subsidiary to this bid item). F'. Furnishing and installing pipe and fittings necessary to connect each end of crussing pipe to transmission main. Furnishinq and installing any wyes, reducers, isolation valves, air release and sample chambers, blow-off val ves, access manways, pipe anchors, guard posts, special fitt.ings and backfill required to complete the Contract Documentl; that are not measured and paid for under another bid item. j. Placing and compacting backfill (including furnishing the select bedding material) to the finish grade shown on the Plans. h. Grading and cleaning up of Cayo Del Oso crossing and affected area (Station -5+38 to Station 100+151 i. Providing water for construction. J. Loading, hauling and unloading suitable excess material removed from the t.rench excavation to the City'S property at the J. C. Elliot Landfill site (suitable excess material becomes the city'S property. The Owner shall decide what is suitable excess material). Providing final grading or stockp; led matenal to provide smooth grades and with maximum side slopes Df ) foot 'Jerti cal to 4 foot horizontal. Unsuitable and unwanted material, as determined by the Owner', shall be removed per Special Provision /\-16 1<:. Furnish corrosion dnd cathodic protection of water line as per Contract Documents Pre constr~ction exploratory survey per Special provision A-47. ~. Restraining joints as called for in the plans and Technical Specifications II. Furnish sl ann water pollution control as specified in the Contract Dccuments o. Furnish traffic control [l. Hydrostatj,; testing, ,;teri 1 iziog, dechlorinating and flushing of completed line 1\1] blowuoff valves (in addition to those shown on the Bid Propo',al) rtnd cap'; required to test, st.erilize and flush the t r an:_Jml ss i )n rna ir const.ruction and ancillary equipment. removing and disposing of existing Section A SP (Revised 9/18/00) Page 4 of 32 q Demol i' io!, and t"'mOV.l I of above ground and below ground improvements with n prTmanent CcL;ement according to Local, State and Federal R'~gu iat iOLs. F'lrn st!, nstal! and maintain turbidity curtain required to prevent migration ,[ sedirner:t from di,;turhed ar-eas ldjacent to, or within, the CJV D,'l '>0 9 Repa iong Lime Stabdized Subgrade: hi-;TIestabi lL.atTon -(;r exTst-.Cng sllbgrdde to convert to a sub-base will be measured by f rIe square yard of complpted base of the thickness indicated on the drawi ngs The I! me will not be measured and will be considered SUbsidIary t, this hid tem. This item Includes, but is not limited to, the followino work: fur-nishing and placing the lime, mixing and compacting the '3ubyr,ide a:; 3hown on the drdwi;lgs and specified herein. 1" Repairing Flexible Base: Flexible bas" (ca-Uche)- shall be measured by the square yard of finished base course c,f t.he thickness indicated on the drawings or specified herein. This iLem im Ludes, but i,; not limited to, the following work: Furnishing, placing and ~ompactinq the flexible base as shown on the drawings and specified herein 1 Repairing Hot Mix Asphal tic Concrete Pavement: Hot M"lxHotU L:aid -A,lpha -j t ; c Concret e Pavement shall be measured by the square yardlf finished pavement of the required thickness. This item includes, but is not limited to, the following work: a Furnishin<.) and 'lpplying prime coat as shown on the drawings and speclf ed herein b. FurnLShiIl'l, placJng and compacting <J.sphaltic concrete as shown on the dLawings "nd specified herein L Repairing Concrete Pavement: Concrete pavement shal1be-;TIeasured by the square foot of finished pavement ot the requir ed thicknef3li and will include placing formwork, furnishing and plac ng concrete and #4 steel reinforcing bars at 12" on center to match up to the exi st ng concrete pavement:. ~_~lring C~ncr~.t~_.'::llrb and9ll.tte.r:.: This item wi I i be measured by the linear foot and will include, but is not limited tc constructing formwork, placing dowels and furnishing and placing the concrete and re i.nfon: ing steel to match up to the existing curb and gut t(, r Re~l.r illg Concret.e Sidewalk.. and Dr iveways: Concrete sidewalkshal1' be measured by-the the followincJ. a. Furnishing and b. Furnlshing and ~. Fil III j sh im! and square foot and shall include placing placing placing formwork. concrete 6x6 #6 wire mesh to match existing. 1 '. Rec::onstruct Saui tary Se~":..:t"_. Laterals: This item will be measured per each and includes, but is not limited to, the fol.lowing work: a. Fllr'nlshincJ the PVC l;p'NP[" pipe and cleanout b COllllcctinq the latetal to the sanitary sewer main. ~ Construct ng cleanout and connecting new lateral to the existing sewer lateral at the property line. d. lncludlng 111 other materials tu complete the work. e. Cnn+-ractol to provide all equipment to maintain the sewer flow during construct1 )n. II ~c'2nnectln9 3anitalL_S_~wer~...!-_e.r__~L::: This item IS meaf;ur,.d pet each dnd includes, but is not limited to, the foll,)winq Section A SP (Revised 9/18/00) Page 5 of 32 a, DLsconnectlng and reconnecting the sani tar y ,:ewer main b, Including .,111 materIals to complete Conn'acto to providE all equipment construct. '::>n existing sewer lateral to the the work. to maintain the sewer flow during T.!encJ1. Sa f ~ ',' _ Trench Safet' sha lL i nc ud,,, Specificatior. shall be measured by the linear foot for all trenches and the cost to provide trench safety as set out in Standard Secti C'll 022022 Trench Safety for Excavations. 18 Dewat:ectng: This -item"shall be measured by the ) inear foot of trench where dewatering is needed to keep the excavation dry, as approved by the Engineer, and '3hal includ, all costs to provide a dry foundation for the proposed Impr()v,..nprds including supplying and installing the geotextile and crushed ,;tone as sho....n on Details em Sheet 31 (Geotextile and crushed stone will be paid fDr ,mder the appropr iate bid items). See Special provision A-61 Dewatering, 19 Geotextlle: Geotext:jI'f sl,all be measured by the square yard of furnished and placed qeotext Ie at the type indicated on the drawings or specified herein. 20.Crushed Stone: Crus-hed-stonE shall be measured by the square yard of furnished, placed and compacted crushed stone of the th i ckness indicated on the drawings or spec fied herein 21 ,Remobiln~ation: -_.._~--_._._.._--- -~._~ This item will be measured and paid (if needed) per each individual remobilizaticn resulting from delays due to permitting or land acquisition and as outlined in Sect ion A-51 of the Special Provisions. This item includes, but is not limited to, the following work: a. Moving in equipment and moving out equipment. b. Storage charges for equipment for 30 days. ~. Stockpiling charges for stored materials for 30 days. d.. Loss of pr ,')fi t due to stoppage of work for 30 days. 22 Disposal oUontaminated Soil: This item will be measured by the cubic yard where contaminated soils, as defined by A52, arE' found within the project limits. !' Dt iU'!y !'llo.....anc:.l': ; Contractor shall insert the figure noted in each Base Bid in his bid proposal, This item shall be used for unforeseen circumstances. Payment "hall bE' negotiated for each circumstance. 24 [terns Not Listed on the Proposal: Items -of-work not-Tisted~~on the' Proposal form necessary to complete the proj eet a~; shown on t he drawings and as specified are considered as subsidlary t" the establ ished bid items and there will be no separate payment Thf ,r cost should be included in the appropriate bid item. A-5 Items to be Submitted with Proposal The fulluwing items ~le ,r~qu~~ed to be submitted with the proposal: 5% Bid Bond (Must reference Project Name as identified in the Proposal) (A Cashier's Check, certified check, money order or bank draft from any State or National Bank will also be acceptable.) Disclosure of Inlerests Stacement Section A SP (Revised 9(18(00) Page 6 DE 32 A-6 !ime of~letion/Liquidated Damages To mi nirn! ze inconvenic':nce to the 'lenera I public and to minimize their exposure to dange,olJ" cOn(1it~lons, 'he -,'ontrdct,,, will be required to follow tight scheduling for const,w t ionH1d wIll be required to meet dead lines for completion of each phase i~hown bc-low.'he P]OjE-ct has been di.vided into phases. The contractor is required to complet~ each ph.'Is.... b,-fore p'oceed .1g to dny other phase. At anyone time, except as noted above, the contractor will not be allowed to start or work concurrently in more than two phases. rime durat LOll for construction is allocated for each phase and [f th. ','Jork i.n that phase is not <umpletels ,;hown below, liquidated damages will be .'Issessed for ,"ach tiay the work is delayed A penalty in the amount of $ 1,000.00 per calendar day wi 11 lle ssessed aqaj nst the contractor as liquidated damages. '~~omplet ,n ~;h.)l to'. plan, SflCc}fi':::at Ions, lsed on S'lt and contr'let tactorv work. completed, in accordance with the documents and accepted by the City. Start o! Project is initiated by the Notice to Proceed. The worklng time for 'ompletlon of the entire Project will be 220 Calendar Days. Each phase at r.he Pr';ject shal] be completed within t,he number of calendar days allocated as describe in the following; Phase I Station HO" to Stati':Jll 106+80 Phase II Stat iun 10\-t-80 to r;tat ion 21:2t63 Phase III -- Stat.ion :2 12+63 t) StatIon 29',+'; 3 Phase IV - Contra!:' Closure 75 Calendar Days 75 Calendar Days 60 Calendar Days 10 Calendar Days Days Allocation for Rain The Cun! (acL-or sha Illnticip,lte the followimj number of work days lost due to rain i.n determining the cO.jtract schedule and for each phase of the contract. A rain day is de fined as any day in whi.:h the amount of ra i n measured by the National Weather Servi ce at the Power Street Stolmwater Pump Station i~; 0.50 inch or greater. No extensiun of t:ime wil be considered until the expected number of rain days has been exceeded and the Engineer has agreed that the status of construction was such that t.here WdS an impact detrimental to the construction schedule. January .3 Days May 4 DaY~3 September 7 Days Februdr Days ,JlJTlf' '\ Days October 4 Days Mal ell :; DaYf; Ju ; ~ Days November 3 Days Apr il Days August 4 Days December 3 Days rhJs pr eet 15 essel rial!1' a ()uflf-ltruction ,'ontract for a period of 220 Calendar Days, a~ det.ai led above in thesl' .:ontract documents. Damages for exceeding the total time dllotted shal b0 independent of damages assessed for each phase, as described above After Contract Award and pF~ construction meeting is held, the Contractor shall commence work within ten (10) calendar days after receipt of written notice from the Directo, of Engineering Senrlces () designee ("City Engi.neer") to proceed. For each calendar >lay that a,]y work remains incomplete after the time specified in the Contract for completion of the work FOR EACH PHASE or after such time period as ext.ended pursuant. to other provi~;ion;3 of t'his Contract, $1,000 per Calendar Day will be asses~3ed aga insr the Cont '.-actor as 1 i qu i.da ted damages. Said liquidated damages 'Ire not Lmposed as a penalty but 1S an estimate of the damages that the City will sustain from delay in completion c( the work, whi.ch damages by their nature are not capable (If precise prlof. Th" D i I ,,,,Lor of Enyineering Services (city Engineer) may wiLhhol,j and deduct from monies otherwise due the Contractor the amount of liquidated damages du, the eLLy from the monthly pay estimate. Section A SP (Revised 9/18/00) Page 7 of 32 A-7 Workers Compensation Insurance Coverage [f the 'ont ract or's '"orkers compensation Insurance coverage for its employees 'NorkiJ'9 Dn the Pro lec' is termi nated or canee led for any reason, and replacement Norkers :':ompensation Insurance coverage meeting the requirements of this Contract ;s nol ,Ii effect: on tbe etfec~ivr:: date of cancellation of the workers' compensation Insurance coverage to De replaced, then any Contractor employee not covered by the "equi Pel 'Nor ker,;' compensat ien i llsurance coverage must not perform any work on the Proje('t Furthermore, fOl cacl calendar day including and after the effective date of terminat Lon or cancell ation of the Contractor's workers' compensation insurance ':overClgf" for its employees working on the Project until the date replacement worker s' compensatFm 1 nsurance coverage, meet ing the requirements of this Contract, s in ei feet fOJ those Contrlctor employees, liquidated damages will be assessed .1galnL;L ud pdlii by tl' Contrlct:)J -:it the bighest daily rate elsewhere specified in Lhi s ('on! ract f;uch 1] quidated damages will accumulate Wl thout notice from the City Engineer to the C'ontrac:tor and wi I I be assessed and paid even if the permitted time to complete the prcjec has not expired, in accordance with other requirements of this Contract, the Contractor shall not permit subcont,ractors ,)r others to work on the Project unless all such individuals working m the Project are covered by workers' compensation insurance and unless the required documentation of SUC'] c:Jverage has been provided to the Contractor and the "ity F:n9ineer A-a Faxed Proposals Proposals faxed diIect ly to the City will be considered non-responsive. Proposals must contain original ;ignatureF and guaranty and be submitted in accordance with Section B 2 of the General Provisions. A-9 Acknowledgment of Addenda The Contractor shall acknowledge receipt of all addenda received in the appropriate space provided in the proposal _ Failure to do so will be interpreted as non-receipt. since addenda can have significant impact on the proposal, failure to acknowledge receipt, and a subsequent interpretation of non-receipt, could have an adverse effect when det,crmi ninq the lowest responsib I e bidder_ A-IO Wage Rates (Revj';ed 7/5/00) Labor pr eference and wage rates for Heavy Construction. CgRtr~ctor ~b~ll U~~ bi3ber ~~~v r~te. In COl,"e of ronnf'lirt- Minimum Pr~vaili!!:.9._ \'l9ge~<:,~I~s The Corpus Christi eit; CO\lnc11 has determined the general prevailing minimum hourly wage rates for Nueces County, Texas as set out in Part C, The Contractor and any subcontractor must no' pay ] ess than the specified wage rates to all laborers, workmen, and mechanic,,; employed by them in the execution of the Contract. The Contractor or subcontractor shall forfeit sixty dollars ($60.00) per calendar day, or portion thereof, for each ,abarer, workman, or mechanic employed, if such person IS paid less than the specified rates for the classification of work performed. The Cont.ractor and each subcontract::or must keep an accurate record showing the names and classj fj cations of all 1abocers, workmen, and mechanics employed by them in connection with the Project and showing the actual wages paid to each worker. The Cont ractor will make bi weekly certified payroll submittals to the City Engineer The COlli, rdct ,r wi 11 also obtain cop ies of such certified payrolls from all subcontLlctors dnd others workinq on the Project, These documents will also be ~;ubmitted to thE' "it Engineer Oi weekly (See section for Minority/Minority Business EnterprLse Pa ticipal ion Policy for additional requirements concerning the f.Toper t't~m and ,'onler: of !h.~ ["1'/ l1l submittals,) Section A - SP (Revised 9/18/00) Page 8 of 32 )ne and ";De hal f .vor ked il exceSf~ r;oJ iddlc (~;ee HOllrs ( I X) times of 4( hours Sect em B- 1 the specified hourly wage must be paid for all hours in anyone week and for all hours worked on Sundays or 1, flefinition of Terms, and Section B-7-6, Working A-11 Cooperation_with Pub1ic~ncies (ReVlsed 7/5/00) rhe Cunt racto,' shall (,)operate wtth all publ L~ and private agencies with facilities Clpera'irg within the imits ut the Project. The Contractor shall provide a forty- pight (48) hour not iCf to any appl icable agency when work is anticipated to proceed in the \ ,:inity of any facility by using the Texas Dig-Tess 1-800-344-8377, the Lone <ita r Not l ficatioI\ Company at 1 80') 669- 8341, md the Sout hwestern Bell Locate Group it jQ, 828 '>1.C FOJ t '1'~ 'ont rdct ur s :)nverllenCf', t he follow i ng telephone numbers are listed: ity Engineer Pruject Engineer l\/E Project Engineer Urban Engineering Mark Maroney Po11ce Department WaLer Department Eduardo Garana, Water Supt. Danny Ybarra Water Distribution Supt, Fred Posada, Maintenance Mechanic Foreman Wastewater Services Department 857 1818 Ga,; Department 885.6900 Storm Water 857 1881 Parks & Recreation 880-3461 St reets & Sol id Waste Services 85'/ 1970 .;EP 299 4833 ~B( 881 2511 880 3500 880 3500 854 3501 882 -1911 857 1880 (880 3140 after hours) (880-3140 after hours) (885-6900 after hours) (880-3140 after hours) (693-9444 after hours) (l-800-824-4424, after hours) Ci'y Street D1v for Traffic Signal/Fiber Optic Locate :~abJevision Acsr (Fiber Opti, ) !<Me (Fiber Optic Cbo,ceCom (Piber Optic) "APROCK (Fiber Optic) 8ruuks Fiber )pt c (MAN f 8'::>7 1946 85'1-5000 887-9200 8U 112.4 881 5767 512/935-0958 972-753-4355 857 1960 (857-5060 after hours) (Pager 800-724-3624) (Pager 888-204-1679) (Pager 850-2981) (Mobile) A-12 Maintenance of Services The Contractor shall cake all precautions in protecting existing utilities, both above and below ground. The Drawings show as much information as can be reasonably obtained from existinll as-built drawings, base maps, utility records, etc. and from as much rield work as normally deemed necessary for the construction of this type of project with regard 10 the location and nature of underground utilities, etc. Howeve r, t::Ee accuEi'i<::L ,~~_ <?2m121eteness of_ _",uch infs>rmat iO[1 is not guaranteed, It is the Cont ractor's >301 and camp ete responsibility to locate such underground reatu:ef Juffjcient Ly n advance of his operations to preclude damaging the existing f ae i], ", f f hi' C .ntract"r encounters ut i 1 i ty serv ices along the line of this .Nork, it is h LS !e~;poLsibi lit y lC maintain the services in continuous operation at rlis o'/,}n ~....~xpen;;e In Lh, '~'/eIlt 'J7 darag' to underground utilities, whether shown in the drawings, the "ontr,let L shd!: make the necessary repairs to place the utilities back in service to const rUef '.he work as intended at no 1ncrease in the Contract price, All such repairs 'Hust ~!onfo,'m '0 the r-equirements of tbe rompany or agency that owns the uti 1 i ii, Sect; ion A SP (Revised 9/18/00) Page 9 of 32 Where existlng sewers are encountered and are interfered with (i.e. broken, cut, ete.) f low must be maintained. Sewage or other' 1 iquid must be handled by the Contract or either by connection nto other sewers or by temporary pumping to a satista<tory ,)utIPI, 11] witt) thp approval of the City Engineer. Sewage or other iqui nust not be pumped, belLled or flumed over the streets or ground surface and :ontract r must pay fer all fines dnd remediation that may result if sewage or other ! iquLi ')nta::ts t lIe streets Ol ground surface. It is also the Contractor's respons i hi] i tI t 'J 'nak.. al] r,ccessary rcpai rs, relocations and adjustments to the satisfartion ,)f the City Englneel at no increase in the Contract price. Materials for repd i rs adi ustmer-.ts or -elocat ions of sewer servicel ines must be provided by the Cml r actoc. A-13 Area Access and Traffic Control :C;uffi i,. L t rift Ie coritrol medsun's must be ilsed to assure a safe condition and to provide 1 minImum f inconvenience to motorlsts. ALL weather access must be provided to all res idents and businesses at. all t. imes dur ing construction. The Contractor must. pruvide tempora [y driveways and/or roads of approved material during wet: weather The C:ontrdct.r must ma i ntain a stockpi 1 e on the Project site to meet the demands ,f ,nclement ,.,'eather I'he Cuntractorwlll be required to schedule his operatlons so as to cause minimum adverse impact on the accessibilJty of adjoining properties. This may include, but s no' ~imitf,d 0 ,^'Jrking dr,vev/ays in half widths. construction of temporary "amps . c The emt r'actor shall comply...,ith the Standards and Practices as adopLed available through the City's Traffic seCUl'" 'he neces,~a)'y ,'ermit from the Cily of Corpus Christi's Uniform Barricading by t:be City. Copies of this document are Engineering Department. The Contractor shall city's Traffic Engineering Department. The e'mtraetor shall 'omply .."ith TxDOT requirement:s, No work will be allowed on the project unt i.l all applicable traffic control is in plaee aw1 approved by the Enginee1 All costs for traffic control ,He considered subsidiary; therefore, no direct payment will be made '0 Contraelt'l A-14 Co~truction ~ipment Spillage and Tracking The Contractor shall keep the adjoining streets free of tracked and/or spilled mate:rJa f) going to or from the construction area, Hand labor and/or mechanical equipment must be used where necessary to keep these roadways clear of job..related mater 1 a Is. Such wor'k mus t be comp 1 eted wi thou t any increase in the Contract price. StreeLs and curb line must be cleaned at the end of the work day or more frequently, if necessary, to prevent material from washing into the storm sewer system. No visible material that could be washed into storm sewer is allowed to remain on the Project site or adjoining streets A-15 Excavation and Removals The excavated areas behind curtn~ d.nd adjacent to sidewalks and driveways must be lil led w1th 'clean" Jirt "Clean" dirt is defined af) dirt that is capable of providinq a good growth of grass when applied with seed/sod and fertilizer. The dirt must be free of deb! 1 s, cal iche. asphalt, concrete and any other material that detract" from it:; dpP,'arancp or lrdrnpers the qrowth of grass. All ex i, [inq i~onCr('te and aspha 1 t within the 1 imits of the Project must be removed un] es herwlsP n"te Section A - SP (Revised 9/18/00) Page 10 of 32 A-lcl-neH's-9-a+y remov-a-:is--ifH?,1-tHiHt<t. but noto.-limi ted~:i pc, ~ .'i ai-~ -Be- -l::fHl-'.3 taered- ,;uw.3-;1.ii---a--Fy-- to the bid item. for F-fte Fe' Of ";- -nod t I'ect--rayment 1+i-t-+be.-ffIafie---4:-B- E-efft~~ ~ dri vc.,ayo, aidc.;allca, "Ctrcct Excavation", A-16 I)isposal/Salv~.of Materials Excess 'xcavated n'atc- ria I_ br oken aspha It, concrete, broken culverts and other unwanl ed mat.eri.aL bec<1mes th( property of the Contractor and must be removed from the Sit" by the Cont:actor The cost of all hauling is considered subsidiary; there' en no dire,.t rayment vii I I be made to Contractor A-17 Field Office ['he Contractor- must furnish t:he City Engineer or his representative with a field office at the construction SJte The field office must contain at least 120 square teet .)f useable space The field office must be air-conditioned and heated and must be furnished with an nclined table that measures at least 30" x 60" and two (2) chairs, The Contracto shall move the field office on the site as required by the city Engineer or his representative. The field office must be furnished with a telephone (with :,4 hour per clay answering service) and FAX machine paid for by the ContLK'C!r, Then, s 1<) separat'. pay item for the field office. A-18 Schedule and Sequence of Construction To miilin,ize inccH!v"ni',nce to the qeneral public and to minimize their exposure to dangerous conditions, ,he con':ractol will be required to follow tight scheduling for construction ~nd \",11 be requited to meet dead lines for completion of each item shown below. The project has Decn d i.v ided into phases. Time duration for construct.ion is allocated ICd each phase and if the work in that phase is not compl,",U as shown hel,.-.,;, 1l.q1iidi-ltcd damages will be assessed for each day the work is de aved, A penalty :.n the amount of $1,000.00 per calendar day will be assessed against rhe con~ractol as liquidated damages Comp]",t Iln shall b,. b.ised -)n EatJsfactory work, completed, in accordance with the plan, specifi-:at 1011S, Cind contract documents and accepted by the City, Start of Project is initiated by the Notice to Proceed. The Cont ,'actor sha; 1 ,;ubmi t to the City Engineer a work plan based on calendar days for construction of the entire project and broken down into construction of each phase This plan must detail Lhe schedule of work for each phase of construction and shall be structured to meet all the requirements of Section A-6 uTime of Completion" and must be subrllltt ed LO the '::it y Engineer at least three (3} working days prior to the pre constiuction meeting The Contractor to funlish Construction Schedule for the following Items SCHEDULE OF COMPLETION Phase Phase Phase Phase I II III IV Stat: ion 0+0" to f;tat iun ] 06+80 Station 101+80 to Station 212+6J - Stat Ion 2 2+63 t( Stat ion 295+73 . Contract C osure 75 75 60 10 Calendar Calendar Calendar Calendar Days Days Days Days The pi al must also i nd lcat p the ,;"hedul f' of t he following work items: !.!1ltial_"-~hedule Submit tu 'he City Engineer three (3) days prior to the Pre- COllstruction ~eet ing an tnit ial Construction Progress Schedule for review. Section A - SP (Revised 9/18/00) Page 11 of 32 "'. items to __~nclud.':.: Show complete sequence of construction by activity, Identifying Work of separate stages and other logically grouped activities. . denti fy the f ic~t work day of each week, Ulimittal [;at"s' --- - -._"-- entire project, TrdIct e ~3Llt"mittal dates required for all submittals for the Re ~.;ubm i .ss 1,)[1 'ev 1 '3C 1110 I f ~;ubmi t as requi !.ed by the City Engineer. j. Once a Month Update: Submit Updated Construction Progress Schedule to show actual progress of each stage by percentage against initial Schedule. it is ;::he meaninCl,nd Lntent uf t hi'; Cont ract that the Contractor shall be allowed to prusecutt' hi:; 'JJ('r k 1t such t imp:; and seasons in such order or precedence, and in C3uch InanneJ a; "'lCl 1 p' 'H" 1GS' "Hlducive to economy "f construction, subject to the f"l ,',wi ng cond t i ,ns A.. ['he schedule e)f :onstructioll ~,hall be structured to meet all requirements of Sec:t'ion A 6 "Time of Complet ion" and as noted above. B. the schedule of canst r\lct i on shal] not conflict with any provision of the Contract Documerts and also that when the Owner is having other work done, it her by (')ntra't or by thej l' own force, the Engineer may direct the time and na'mer of c'Jn3trjcting the work done under this Contract so that conflict will DC dvoi.deduld t ee cons' nwtlon of various works being done for the Owner will bt. narmoni 7ed A-19 Construction Project Layout and Control The drawLngs may depict but not necessarily sections, measurement:;, bench marks, baselines, construct a pI"Oject 0' this nature include: lines, slopes, grades, etc. that are normally required to Major controls and tW( (2) bench marks required for project layout will be provided by '~he ('i ty or Con::u l' ant Pre i eet Engineer The Contractor wil iI<!ork. f Irnish ~11 lines, slopes and measurements for control of the ff, durl[]g constnl<,ti,)n, It s :>ecessary to disturb or destroy a control point or bench mark, the Contri'.::tor stall provide the City or Consultant Project Engineer 48 hours not ice so that alternate control points can be established by the City or Consul tant proj ect Engineer as necessary, at no cost to the Contractor _ Control points or bench marks damaged as d result of the Contractor's negligence will be restored by the '"it, 01 Consu I rant Project Engineer at the expense of the Contractor. ff, for whatever reas"n, it ;s necessary to deviate from proposed line and grade to proper l} execute t h,e work, the Contractor shall obtain approval of the City or Consultant Project Enyineer prior to deviation If, in the opinion of the City or ::onsul tant Pruject En'j i neer, thE" n"quired dev iation would necessitate a revision to the dIawings, the ConI ractor shall provide supporting measurements as required for he Ci ::\. or Consul tan' Proje( t Engi neer to r,,",vise the drawings. rhe ContractoI sha! I t Ie If] (J refyrence all valves and manholes, both existing and proposed, for the pll.r['ose of 3.djust lng valves and manholes at the completion of the paving process ./\10;0, r.he City or Consultant Project Engineer may require that the Contract ()L fUl'nish a "laximum of twu (2) persunne 1 for the purpose of assisting the meaSUJ lJ.g oj t hf' Ctmp eted w< 1 k The Contractor shall provide the following certification for documentation and .fer i.f I cat ion ,)f (:ompl anc.. w th t lie Contract Documents, Plans and Specifications. 3aid "ompllance cErt' ficaticn;hd!] be provided and prepared by a third party indepenClent Regl,;t,'!.'e'l Pr()fe~,,;j')ndl [,and ~;ur'Jeyor (R.P.!~,S.) licensed in the State ,f Te':!1 retained md paid f;( Ill-" C'ontIZlctOt The third party R.P.L.S. shall be Section A SP (Revised 9/18/00) Page 12 of 32 lPJ.:,r-O 'e" by tne :1'y hl rd p", ty surJECY"f prior t dny work. Any discrepancies shall be noted by the irld cerl 1 f '(,;mpliance 10 dny regulatory permits. FoJ lo\.!j I ]: 'he m,[llE;Um c,ch,'du '" f documen tat ion Lequ i~~c! : frto-Fe~ -- .AH"etiffl rcturnG-at ~~ o!..tangcnC)7poTfl~--o!. ci rcumfc~ -----~b d~ ~to~H{.w- :!-i_ne. -b'2l::.ll-~ 3ideo-Bf-<Jtreet on .J. 200' intcrv.J.l ..-.Street -crBWHS--BR--a-20Q' interva1----an4--;:lt .J.11 intcrocctiono. Wastewater': · -- M ic-+~~f!lf.l n~c:. f'!'= c I CV~5 .af'--ffiafll1Bles- ..--,M-l-in€€f'occting linco in ~- ..-- ~~ _I:C 1 c -,J~t i() ns.::- \~o!p ~f7€-ang_!l ew--H-Re-t- (T1LO_OT -aficl.BR_ pc rm i t G) Water. · All toE.. at Vd Ive boxes · Vatve-vaults rim-- · caslng€levafiOns ,top of J2iRe and flow line)__lTxDOT and RR permits). . CP Test Stations and anodes. &HH=m-.WttEei"-7 .-M I t 1 fill ,invert Clcl.J.tiono .J.t fII.J.nholcs ---M4-=intcrDccting lineD'ill'm;-nholeD --C.:w~n9~.1E~ionD_ (~p_~pipc .md flm,--l-ifl€-}_LT~'l' ~d---RR-pcrlflit::J) A-20 Testing and Certification All tests required under this item must be done by a recognized testing laboratory selected by the Engineer Consultant. The cost of the laboratory testing will be borne by the City In the event that any test fails, that test must be done over after correctLve measures have been taken, and the cost of retesting will be borne by the Contractor and deducted from the payment Lo the Contractor. SCHEDULE OF TESTIN(; B' THE C TY J. f.~be?ment, Fill ,md Backfill Lanoratory festiLg: [1 Gradat ion 12 Moisture-Density Relationship i 3 In-Place Densi ty Test s 45 Ea. 25 Ea. 850 Ea. /. Concrete Lat)oratory festi ng: (1 Concrete ('ylindel (l set is 3 cylinders) . 20 sets ',. f<e,;t,EaintTl9 JoLnt._~elds [Jaboratory resting il Dye Penetrant Te~;t.ing 2 Rad i ocpaph Testing 500 Ea. 500 Ea. 'T. ::;ubg!:ade Preparat~I1' Embankment and Backfill Laboratory restIng: 11 Moisture-Density Relationship (Proet.or ('urve) 2 In, PLace Pensi ty Te~;t ,; 5 Ea. 15 Ea. Section A SP (Revised 9/18/00) Page 13 of 32 ~.:.) . Fl,~x.iblc Base Cc,urse (See Subsection 025221 JiHloratory Test I ng: 1 Moisture- lensity Rel;,t lonship t:r-o(':~(jr C rve) In ['idle .lensity Test". Ho' tiix Hot L~io A~Jl.Ilal t ic C:oI!cret~~.Clvement 5 Ea. 15 Ea. (See Subsection 02542) uduurdtor} Testlng: Extraction Test 3tability and Labollt"ry Density Fie 1 d ')e n ..' it y 2 Ea. 2 Ea. None Required Testllg including sampling, will be performed by Engineer or the testing firm's labor it "y personnel in the general manner indicated in the Specifications. Engin e shelll Ilet rm ne the eXi;r-! time, location, and number of tests, including sampl~.'s Arrangements for ,iell very of samples and test specimens to the testing firm's laboratory will be made by Owner. The testing firm's laboratory shall perform all laborat,ry tests within a reasonable time consistent with the specified standards and sha furnish. WI ittcn eport of each test. ':'ontriC' or sha 1 L fur nish all sample materials and cooperate in the testing dctiv t,es, including sampling. Contractor shall interrupt the Work when necessary to al Low testing, including sampling, to be performed. Contractor shall have no r.::laim fe'L an ine rh-lse in Cont ract Price or Contract Times due to such interruption. When te;;ting dct iV ti,'s, including sampling, are performed in the field by Engineer or the t cst ing f inn's laborat.ory personnel, Contractor shall furnish personnel and faeL] itles to assic;t n the activities. When Lhe specificatiens require inspection of materials or equipment during the production, manllfactul ing, or [abn.cating process, or before shipment, such services will b( performed b Engineer' ur an independent test ing firm or inspection organ z;Jt ion accr~pi ab e to EHgi Ileer Owner c'.r-,al I al range for and pay an independent organization to perform the inspect on "ecv 1 i:C'; speci f ied for t he concrete pipe. Contractor shall gAve appropliate written notice to Engineer not less than 10 days before offs] te inspect ion servicer; are required, and shall provide for the producer, manufact urer, or f abl i cator to furnish safe access and proper facilities and to coopelat c wi t h iw;pec.ting personnel in the performance of their duties. The cnsper.t ()n orqanizati)Q wil I SUbml! a wri tten report to Engineer. with a copy to Contract :'1', at: lea,;t nce each \"ee~ The Contractor must provide all applicable certifications and testing documentation for all material verifying compliance with specifications to the Engineer Consul tant. Contrdct or shall obta 1 n Engi net'r' ,; accept.ance of the testing firm before having servi('e~ performed alid sha I i pay a 11 costs for these testing services. A-21 Project Signs The OlD'; actor mu~;t urnish and install two (2) Project signs as indicated in -HH--!.-ewHl3---{-}raw-.i-H<j{3 !At-~ Ic.~. Standard Specification Section 021010 Project Signs 'I'h, s qnfi mwt be installed before construction begins and will be rnai nta ined throughout the Pr)jec1 period by the Contractor. The location of the "i9ns" 1 he dctplmi,ed in the f:ield by the Engineer Consultant. Section A - SP (Revised 9/18/00) Page 14 of 32 ~~2__ M~ll()ri ty /Minority Business Enterprise Participation Policy (Revised 10/98) '0 JC}' t s the ::)oJ ic\ of th., ('it y of Corpu,; Chri st,j that maximum opportunity is ,t urded minol it '2S, women dnd Minority Business Enterprises to participate in 'fl' pc r f)nnarwe f cant '-act s awarded by the city of Corpus Christi in support ,t Equal Emp]oymHlt Oppe,rtunity goals and objectives of the Affirmative Action Po lCY Statempnt of the City dated October, 1989, and any amendments thereto. In'iccorclance Wl t,h such pol LCY, the Cl ty has established goals, as stated 'ie'pin, both or minori-'f "tIle! female participation by trade and for Minority Su~ ness Enterp} se '-Ie t } nit i )nE Prim~ '~ont ,acto} !-UlY pelson, fl1m, partnership, corporation, assoclation or oint venture as herein provided which has been awarded a City contract. :) . Subcontractur: associatIon-or labor, serfi ces, foregoing under Any named person, firm, partnership, corporation, joint venture as herein identified as providing work, supplies, equipment, materials or any combination of the contract with d prime contractor on a City contract. MiJ:lOrlty _~lJ';i_ne~~Ent~J:2rise: A business enterprise that is owned and controlled by one or more minority person(s). Minority persons include Blacks, Mexlcan-Americans and other persons of Hispanic origin, American Indians, Alaskan Natives, and Asians or Pacific Islanders. For the purposes 01 this sect ion, women are also considered as minorities. Minority person(s) must collectively own, operate and/or actively manage, and share i;" payments from such an enterprise in the manner hereinafter set fort h : WTIf'i a) For a so Ie propr ietorship to be deemed a minori ty business enterprise, it must be owned by a minority person. ,b) For all enterprise doing bus,iness as a partnership, at least 51 0% of the assets or interest in the partnership property must be ,)WYled by one or more minority person(s) . Ie) For an enterprise doing business as a corporation, at least 51,0% of the assets or interest in the corporate shares must be owned by one or more minority person(s) . Cont "0 I ] ed The primary power, direct or indirect, to manage a business enl< rprise rests with a minority person(s). ShaI" in Payment,; Minct'ity partnen;, proprietor or stockholders, of the enterprise, as the case may be, must be entitled to receive 51.0% or more of t he total pr-of its, bonuses, dividends, interest payments, commissions, con~;ulting fees, rents, procurement, and subcontract r:'ayments, and any other monetary distribut.ion paid by the business cntE" rpr ise , L MinoIlty ;ee de' lnit Or! under Minority Business Enterprise. Fef11a~e _Owned Business Er~terpri_~e, A so le proprietorship that is owned and controlled by 1 woman, a partnership at least 51.0% of whose assets (Jr pat l:I1tcrs ip intyre,;t,; dre owned by one or more women, or a corporation ell I ea"l 51 0% of !/hclf1fOlssetc; or interests j n the corporate shares are nwned bv on or moce women Section A SP (Revised 9/18/00) Page 15 of 32 ,JOJ.nt Venture: J. joint venture means an association of two or more persons, pc,rtnersnips corporations, or any combination thereof, founded to Cdrr; 0 a siLgle business activity which is limited in scope and direct ion. The degree to which a joint. venture may satisfy the stated MBE gOd i Cdmot: exceed the proport ionate interest of the MBE as a member ,:,f thE:' oiut venture 1 I. the work to be performed by the joint venture. For examplf. a jOint venture which is La perform 50.0% of the contract .."ork, U.ell and i.:1 wh I [:h a mi non. LY joint venture partner has a 50.0% in! crest:, ,hall be dee:ned equivalent to having minority participation in /5 0% of t tle worl< 1>1 inority members of the joint venture must have Fit he r in,me La 1. mana',Jerial, or technicaL skills in the work to be per for med t,/ the oint .entu1.p ;0;' ~ s lhe '3oaLs Ent.erpriset work for-ce fa i lows Minority Participation (Percent) 45 '", for participation by minorities and Minority Business expreEsed in percentage terms for the Contractor's aggregate on a! i construct.ion 'Nork for the Contract award are as Minority Business Enterprise Participation (Percent) 15 % These goals are applicable to all t.he construct.ion work (regardless of federal participat.ion) performed in the Contract, including approved change ord('cs. The hours of minority employment must. be substantially uniform throughout the length of the Contract and in each trade. The transfe1. 0' minori.ty employees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's percentage is prohibited. 4 . ~olrtf:ll ~i:l..!1ce 3. Upon completion ot the Project, a substantiated by copies of paid Contractor to the City Engineer. final breakdown of MBE participation, invoices, shall be submitted by the The Contractor shall make bi-weekly payroll submittals to the City Engineer. rhe Contractor is to indicate the percent of minority and female part icipatian, by trade, which has been utilized on the Project. Along with the request for final payment on the Project, the Contractor wi]] indicate, in writing, the overall participation in these areas which have been .ichieved. l'he City Engineer may wi thhold monthly or final paymeotf. t( the Contr actor for fai lure t.o submit bi -weekly payrolls in a t imel, fal'hion or to submit overall participation information as r ecru I r cr A-23 Inspection Required (Revised 7/5/00) 'fhe-~.ffiLrae{ceF---s-ba+.l- afrS-lir-e--t.fi-e---appropriutoe .bui lding inopectiona by the Building InopceBon Di ....10ion dt. the v.:lrious intervdlo of '..rork for 'Nhich a permit io required aREi----Ee---aooure ;1 ~1 inopecE-iEffi-~..--Ehe---building j 0 completed and ready for oCCUp;:lllc~Contract-Bf fllH-5-t,-e&E-aiH-tBenC~icate of Occupancy, when applicable. Section R-6 2 ot the (~enera] Provisions is hereby amended in that the Contractor must paj al1 :ees and chargeL levied by the City's Building Inspection Department, and all 'Jthel C1t:. f'es. in'::ludi.ng water/wastewater meter fees and tap fees as "equi r eel by C, t A-24 Surety Bonds Paragraph two (2 "f :;ection H f01 I O\N~::; 4 of thf. Genera 1 provisions is changed to read as Section A - SP (Revised 9/18/00) Page 16 of 32 N. sureLy .,,; 11 ,e accepted b'r' the ("ity from any Surety Company who is in defall1' (>/ del.inquent on any bonds or who has an interest in any gati~n 3g~in;t the City All bonds must be issued by an approved II .ty (ompan'( uthor iLed l (, do business Ul the State of Texas. If "e: 1 Ot manc" dnd ,ayment (Jonde; are in an amount in excess of ten percent ] ") 'yf the SU1"ty r'or;pany's capital and surplus, the Surety Company h,']l prJvide ce,tification ,;atisfactory to the city Attorney that the 'Ul ('ty C':>mpdfl/ hiS rein~;llred the portion of the bond amount that exceeds e pep'en! 10) of he :C;urety Company's capital and surplus with e ilsurer ('3 lutl ()ri zed to do business in the State of Texas. The amount t :he bood r"iT: ured b'/ any reinsurer may not exceed ten percent (10%) 'f the reinsurer s capLtal HId surplus For purposes of this section, h, amount r a owe(j apit ,1 and ';llrplll,3 will be verified through the t ,: e Bcar(j f nSUrdtl[e ,})f the date of the last annual statutory t i 'lane ial 'itatemcnt of the Surety Company or reinsurer authorized and ,dm i tted to jo business I n the State of Texas The Surety shall de~; tgnate an dgefit who s d 1 esident of Nueces County. Texas. Each bond must be executed by the Conl factor and the Surety. For contracts in '~x,:ess of $100,0 0 the bond must be executed by a Surety company that is ~ettified by 'he United States Secretary of the Treasury or must obtain tC nsurance f ,r dlY liability in excess of $100,000 from a reinsurer that s :ertl fied by the Un tcd States Secretary of the Treasury and that neets aj 1 '_he ailOve requ i remenLs . The insurer or reinsurer must be : i red in the Fe:ieral Register as holding certificates of authority on h,' daL_c the bani was issueo " A-25 Sales Tax Exemption (NOT USED) &eeHOfl.-B-6-;';!-, - -Cfd*- t>xemptieft provioion;- -is- deleted - in ita entirety and the EB-l ffiwing -0 ubo tit. u t-ee Ht --l-i€u {che reeh Contrae{-s-4e-r- cHllpl"O'lfeitceffi:&-ro -Fea} prBf*7rty--awa-F4efr-By--Ehe-Eity of Corpuo Chrioti do l"t&E-~u-a; i fyfOE e){empt-iBRs--of--8a-lesi-B~---an4- Uoe Taxe::; unleoo the Contractor clCcto---E-o operate BfldEr a Deparated -contract ao defined by Cection 3.291 of Chapter " Tax ^dminiGtr;:JtiBH- of Title }4-, Public Finance of the Texa::; l\dminiotrative Code, El-F--sttefr-~- rules-Ifr regulcatiofls ;:10 may be promulgated by the Comptroller Bf- Public ,~.ccounto of 'Fexa"~- [-f-. tJle--C,**,-FiH~tor ele, t-&--tB-+~at€- under a -eep.:lrated -eBflEr.:let, he shall: +-=-. ---B&tca-Ht--t:he oece8~~ary &ales tax permitcs-- from the St.:lte Comptroller. Ceo identify in +he- apfH'O!H-+a-tcespa€eeft--E-he "StatemCH-E- of Materialo and Other Ch,H~&lL-ifi-+-he r}roposal --FBFffi .mEh€-~~teri.:llo phyoic;:Jlly incorporated ,Fit o--t' ~ --P-F&t."€-t '-om PrOVWe-Fesa-le C'~Ftit--i€<~-to-~~ 4~ P+CHv+ae Ehe C IEcy ~-€opies of --mat~. invoiccD to subDt3.ntiate the proposal +a f He- ef . mat~~ r-ia lit_ -f~-t;he--Fontr.:lctor doc:, --Bet elea-+-Hoperate -lfFlee-F ;:J sep.:lr;:1tcd contract, he muot pay f.er.-all 8-al-e&-, E](c j GcaHd-Use--'+'iH<es app-l i-e-ab+e---tco..-to-lH-s- r>roj ect_ 8ubconB~3- alOe --e-+-~-e- for ""lcG tu)( cJ(cmptiono if thc oubcontractor uloo cORlplies~- {c~ :1bovc -requirements. -..-'!'he--- Contr.:lctor muat isouc a rco.:lle eerBf-ieat=e---te--ffie.-fiH~Fa-<~8'+F--d-HEl----tofle. -subeeHt:r.Jctor-;m in turn,--isffiteS---a reoJle ee'FB f f-f'.tE-e LO-4t-H; SUI'tl1 ier- /\.~~plementa1__1nsurance Requirements POI edC ContLlct po] ic.,/ ( 1 flsuriH,c,' C ,veL3ge provided tn the Contractor shall obtain an igned h" ! he insure), c:tat i ng: accordance endorsement with Section B-6-11 of the to the applicable insurance Section A SP (Rpvised 9/18/00) Page 17 of 32 n ,he eventc.lf :ancellatioll or mated a I change that reduces or restricts the i n,;urance afh)rdcd by LlL is coverage part, each insurer covenants to mail prior written notice cf cancellatton or mat:eri~l_ cl?:an~e to: Name: City af C~rpus Christi Engineering Services Department i'\t t" : Cc)nt ract Admini stra tor i,dd,ess: P O. Box 9277 ('oruus ChI' sti, Texas 78469-9277 Number of days advance notlce: 30 fhe Contractor shall pcovide to the City Engineer the signed endorsements, or copies thereof certified by he insurer within thirty (3D) calendar days after the date t. he C! t\ Engineer 'eg!lests that t he Contractor sign the Contract documents. Within t.~irty (30) calendar days after the date the City Engineer requests that the Contractor sign the Contract documents, the Contractor shall provide the City Engineel with a certificate of insurance certifying that the Contractor provides '.vorker';:: compensat ion insurance coverage for all employees of the Contractor employeo on the Project described in the ConCract. For E>3C:1 insurance coverage provided in accordance with Section 8-6-11 of the Contract, the Contractor shall obtain an endorsement to the applicable insurance policy, signed by t he insurer, ~;t;lt ing that the City is an additional insured under the insurance po icy. The City need not be named as additional insured on Worker's C:ompens;c,t ion coverage For contractual iiabi tty insurance coverage obtained in accordance with Section B- 6-11 : a of thE" ('onl' ract, the Contractor shall obtain an endorsement to this coverdg'- stat.cny Contractor agrees to indenmify, save harmless and defend the City, its agents, servants and employees, and each of them against and hold it and them harmless from any and all lawsuits, claims, demands, liabilities, !o,:ses and expenses, including court costs and attorneys' fees, for or on 'lc'ount of any' injury to any person, or any death at any time resulting rum such injury or any damage to any property, which may arise or which 'TIay be alleged Lo have arisen out of or in connection with the work 'overed by th i s "ontract:. The foregoing indemnity shall apply except if ,.;uch j njury, death or damage is caused directly by the negligence or other fault of the City its agents, servants, or employees or any person n. lemn i f ied hereunder A-27 Responsibility for Damage Claims (Not Used) Para~raph -+a+-GeBer-a-l . Li:lbi.l.:i-t-y-. -oESe€t:ion- B 6 11~ the Ceneral Pro'.rioiono io ClmendcG' -leBo iTH",l-llil€--- 8efTt~---ffll:lS-t provide - ProfcDflional . Pollution Liability/En-.-iroBBlcntal Impairmcnt.-HtfHff.aR€e cover;:\ge ~ the teFffi--*-~ontr~:lCt up to ~:md including IOcfie 6aff --t;;fle- ('-it-y- f ina}l y ;:\cceptG ~-er---wer~ Contractor IfIUDt pay all e-est-s--neceoo;:\ry t-e-procure. ouch inouranee-eoveragc, including .:my deductible. !'he..ei~-be-.-named -cH.kl.-icE-ieHa-l-. inD~lred on .:mypolicieD providing ouch t -H 8+t-Fa-fl-€-e... f~-n"\I4::>' r a.;~- A-28 Considerations for Contract Award and Execution To al O'w the C'ty Enqineer >:0 determine that the bidder is able to perform its obli.gatllms under the proposed contract, then prior to <lward, the City Engineer may requite 1 bldder t, plovide clocllmentation concerning: Section A SP (Revised 9/18/00) Page 18 of 32 i . Whether any 11 ens have been filed against bidder for either failure to pay for se:vices or materials supplied against any of its projects begun within the pIf.ceding IIVO (2' years. The bidder shall specify the name and address of the i'a y !1cldirl9 trk lien, r:h" "lTlount of Lhe lien, the bilsis for the lien claim, d1; the d"t e i)f the nlpdsc of the I ien. If any such lien has not been 'f' ,.ased, rt1e bi ider Shdl] ,tate why the claim has not been paid; and ,~ht t het ther E' cUt' any outstanding unpaid cia ims against bidder for services or 'na prials ~;upplJpd which relate to any of its projects begun within the pn cedinq two (2 years The bidder shall specify the name and address of the 'ldlmant, the amount of the claim, the basis for the claim, and an explanation tih. the::-laim ha not b,~en I.did. A bidde may also be ~equired to supply construction references and a financial statement, prepar:-ed n later than ninety (90) days prior to the City Engineer's request signed and dated by the bidder's owner, president or other authorized party specifying all current assets and liabilities A-Z9 Contractor's Field Administration Staff The Contractor shall pmploy tor this Project, as its field administration staff, super i nl endent s and foremen who ,ue careful and competent and acceptable to the City Enginpe> The criteria upon '""hidi the City Engineer makes this determination shall include the following: rhe superintendent must have at least five (5) years recent experience in the field management and oversight of projects of a similar size and complexity to t..hlS Project. This experience must include, but not necessarily limited to, flcheduling of manpower dnd materials, safety, coordination of subcontractors, ann fami 1 iacit"y" with the submittal process. federal and state wage rate requir:-ements and City contract close-out procedures. The superintendent shall be present, on the job site, at all t~es that work is being performed. 2. Foremen, if uti I i zed, shall have at least five (5) years recent experience in similar work and be subordinate to the superintendent. Foremen can not act as superintendents 'Nithout prior wri tLen approval from the City. Documentation concern ng these requirements will be reviewed by the City Engineer. The Contractor's fie]j administration staff, and any subsequent substitutions or replacements thereto, must be approved by the City Engineer in writing prior to such superintendent or lorpman assuming responsibilities on the Project. Such written approval of field administration staff is a prerequisite to the City Engineer'S obligation to execute a contract for this Project. If such approval is not obtained, the dwa~d may be rescinded. Further, such written approval is also necessary prior to a 'hange in field administration staff during the term of this Contract If the COlltractor fails to obtaln prior written approval of the City Engineet concerninq any substitutIcms or replacements in its field administration staff fur thi:; PloJect dur ing the teem of the Contract, such a failure constitutes a basis to annul the Cor,tract pursuant to section B-7-13 The Contractor shall employ for this Project, as its field administration staff, superlntendent.s and fccemen who arl' careful and competent and acceptable to the City EnCjln'c~e! A-3D Amended "Consideration of Contract" Requirements Under "General ProviSions and Requirements ror Municipal Construction Contracts" Section B 3 1 Cons ide' at ion of Contract add the following text: Section A SP (Revised 9/18/00) Page 19 of 32 Within five (':,I.NorKing days toJ lowing the public opening and reading of the propcsa Is, the three (3) apparent lowest bidders (based on the Base Bid only) must submJC: to the Cit~ EI!gineer the following information: L !I, is' )f' h,' m, j or ':ornporwnts of t he work; !I, i ist )f t h< P OdLlC:~,; to be incorporated illt:o the Project; J. A schedu Ie of I'alues which speci f i es estimates of the cost for each major component at th,> work; 4. A schedule or atiLiclpat ed monthly payments tor the Project duration. 'J. niP ndmes dnd aJdresses of MBE finns that will participate in the Contract, a]'mg wLth a description of the work and dollar amount for each firm; and sLbstant iat ie,n, ~iLher through appropriate certifications by federal agencies .)] slgned dlfi,iavits from the I-IBE firms, that such MBE firms meet the '3u1del ines contd ined herei n Similar substantiation will be required if the ::(,nt:rdctor 1 sm MBE. ] t the responses do not clearly show that MBE participation will meet. t he requirements above, the bidder must clearly jemonstrate, to :he satisfaction of the City Engineer, that a good faith effort nas. in tact, leen made to meet said requirements but that meeting such requirements is not reasonably possible '\ 1st of sutcoritractors that will be working on the Project. This list may :ontain more thelO one ~;ubcontractor for major components of the work if the 'o'lr-:ractol hac; n ..t comp1 pted his eva 1 uat ion of which subcontractor will perform ".hr. worK The City EngJneer retalns the right to approve all subcontractors that will perform work on Lhe Project The Contractor shall obtain written approval by t.he City Enginee,' of all of Lts subcontractors prior to beginning work on the Pruject. If the City Engineer does not approve all proposed subcontractors, it 'na resc i nd t he ~ont ract awar"d in the event Chal a subcontractor previously listed and approved is sought to be substituted for or replaced during the term of the Contract, then the City Enq! neer retain" the right. to approve any substitute or replacement '1ubcontractor pI lor to its participation in the Project. Such approval will not be given j f 1 tle replacement of the subcontractor will result in an increase n the Contract price Failure of the Contractor to comply with this provision 'onstj tutec I has is upon which to annul the Contract pursuant to ~e<t ion g.7 ];; A prel iminary plogress GcheduJ e indicating relationships between the major '-omponents uf th., work The final progress schedule must be submitted to the 'i'y Engineer at the pn' cunstruction conference; 8" Documentat ion required pursuant to the Special Provisions A-28 and A-29 "oncerning Considerations f01 Contract Award and Execut.ion and the Contractor' s ie I d Admin.l.s! ra' ion Staff q Documentat ion as requin'd by Special provision A-3S-K, if applicable. 10. Within five (5) days following bid opening, submit in letter form, information identifying type of entity and state, i.e., Texas (or other state) Corporation or Partnership. and name(s) and Title{s) of individual(s) authorized to execute contracts on behalf of said entity A-31 Amended Policy on Extra Work and Change Orders Under 'GeneraL Provlsiuns and Requirements for Municipal Construction Contracts" B- J ~....R2lic:/. on ~){t~a !'!.Ot k__~nd_ (,h~nge Orders the preEcnt text is deleted and replaced with the t01 o~inq Section A - SP (Revised 9/18/00) Page 20 of 32 ~lllractor acknowledges that the City has no obligation to pay for any extra >i011<: tor: which a change order has not been signed by the Director of Enq I neer ing Serv ices or hi~; designee _ The Contractor also acknowledges that h,> City Engineer may authorIze change orders which do not exceed $25,000.00. The Contractor a'knowledges that any change orders in an amount in excess of c>" 000,00 'llU:5t dso be appr U"v'ed by the City Counc L A-32 Amended "Execution of Contracth Requirements Under "(;eoelal Provisions and Requirements for Municipal Construction Contracts" B- 3-5 Execution of Contract add the following' rhe award of -he Contra~t may be rescinded at any time prior to the date the Oily Engineer de ivers a contract to the Contractor which bears the signatures of the City Manager, City Secretary, and City Attorney, or their authorized de~;ignees, Contractor has no cause of action of any kind, including for breach ;)f contract, against the City, nor is the City obligated to perform under the Contract, unt 1 t he date the City Engineer delivers the signed Contracts to the Cant ractor A-33 Conditions of Work Each nillder must tamJ Liarize hImself fully with the conditions relating to the completion of t:he Pruject. Failure to do so wi 11 not excuse a bidder of his obligation to carry out the provisions of this Contract. Contractor is reminded to 3ttend the Pre-Bid Meeting referred to in Special Provision A-I. A-34 Precedence of Contract Documents [0 case of conflict in the Contract documents, first precedence will be given to addenda issued during the bidding phase of the Project, second precedence will be given tu the Special Provisions, third precedence will be given to the construction plans, fourth precedence will be given to the Standard Specifications and the General Provisions will be given last precedence. In the event of a conflict between any of the Standard Specificat,ions with any other referenced specifications, such as the Texas Department of Public Transportation Standard Specifications for Highways, Streets dnd Bridges, ASTM specifications, etc., the precedence will be given to addenda, Special Prov! sions and Supplemental Special Provisions (if applicable), construction plans, referenced specifications Standard Specifications, and General Provisions, in that order, A-35 City Water Facilities Special Requirements /l, . V is i torjC~I1t!:actor Oric!lLat:joll (Not Used) PC-l"-i-Br to perrof'ming \Joele .a-E- ,:lD)' City 'h'(lter -E(lcility, the Contractor, hiD aubcontro.ctG-FS--, o.nd e(lch of their employecD must have on their peraOR a ~.. ear'6- eeFtifyj ng +fie..i..F prior (lttendance o.t 0. Visitor/Contractor E.1fety - Orirnt.1tion -Progr.J.m conducted by the---~ W.J.ter Department Personnel,- A-. Vi-6-itEH'/t~ractor Latety Orient;1tion I'rograffi ,.'ill be e-J'..F.ered by- ,]trtho~-t'ity W(lter Departmcnt perGonncl for thoGe perGonG ~,tle-~-have :..;uefl.-a -co.rd, .:lnd ',.ho desire to perform any \.'or]t ....ithin iHT'f---8Hy-,.jatcrfa€ili~----F'eF- addi t--iBnal. - -information refer to Attachment l~ " Opera~io~f CitY-~_E!~_ Equipment The Contractor shall not start, operate, or stop any pump, motor, valve, equipment, switch, breaker, control, or any other item related to City water facility at any time. All such items must be operated by an operator or other authori.zed maintenance employee of the City Water Department, Section A SP (Revised 9/18/00) Page 21 of 32 Protection of Water Quality rhe Clty must deliver water of drinking qualLty to its customers at all times The Contractur shall protect the quality of the water in the job siLe dnd shall coordinate its work with the City Water Department to protect the quality of the water Conformity with ANSI/NSF Standard 61 i\li Inater als and equipment used in the repair, reassembly, t ransportat ion, reinstallation, and inspect ion of pumps, or any other items, which could come into contact with potable water, must conform to American National Standards lnst i tute/National Sanitation Foundation (ANST!NSF) Standard El as described in the Standard Specifications. Such materials include all solvents, cleaners, lubricants, gaskets, thread compounds, coatings, or hydraulic equipment. These items must not be used unless they conform with ANSI/NSF Standard 61 and unless such items are inspected on the site by authorized City personnel inunediately prior to use. the Contractor "haLl provide the Engineer with copies of written proof of AN5I/NSF Standard 61 approval for all materials which could come into 'ontact with potable water. Handling and Disposal of Trash All trash ':Jenerated by subcontractors, must be site. Blowing trash wi 1] areas clean at all times the Contractor or his employees, agents, or contained at all times at the water facility not be allowed. The Contractor shall keep work and remove all trash daily. CONTRACTOR'S ON-SITE PREPARATION (Not Used) F~ -C~-aeB7F'a peroonnel muot ',.'Car colored uniform overallo other than ~, bluc, or ,(hitc. - Each employee Wliform DnJ!]t pro...ide eSBIIlany DaJllC aDd indi7idual cmployccidcDtification. .' -t;eH-toT~sha-l~----frrBv-i4e -Eele~es----Eor Contra.ctor peraonnel_ Plant telephonea arene-t ::l.yo.ilable for Contractor UDe. r+~ ----wBIk-lnq hem &---w-i+-l- -ge--7--{)0 A. M. -E&~~cT--Mond::!y thru Friday. !~ -BeHE~OF-muDt no-E~ Ufre-iH'tY--~y -f-ae-i li-t-y-dFcDtroomo. Contractor muat provide own o::!n i t.J.ryf-ae-i-~fh ,+-,---,lld-l--8entraeteF---Vehi-e-les-muot be parked at deoignated Gite, ::!D deoignated by-G-i-Ey- Watcr Department- Gtatt. }'.ll---80fiE-Faetoor vchiclco must be clcarly -l~ company name. N~va-E-e- cmployec '.fehicleD arc allowed at O. N, Bte'Jeno Water 'I'Featomento- Plant _ A-l--l-- perDonnel mUDt be in comp::!n)' vehicIcD.~I~-~in-g hour::;, contr:lCtor employecD mUGt not leave the des--Htfhl-€-ed--'--'BftS-E-~eH--- arca no!' ~.':mdc r t-iH-eugft----aRY--bui ldingo other th:m f'BF +e-E!uiR"--d--W&f'k-eF--asffi-r€-(~tc-ed -by ci-€-y- -~ Departmcnt pcroonnel ffiH iR€f -€-'fle-Mjefle-Y-eva-eua t i O-Ft-o- Kc~- ~H~ ~i.f~c.:.atio~__ AC~-m1-GN -~ .__...__n________ _.__ _~_ 8-8illA-------f-SUPERvrs0Wi -CONTROL roID D.",T.", Any--wei'-k<<'-E-fle-.--eomp~-9ase-d FIloni tor in9 ::!nd - control GyoE-em 1lffiS--E-- be peFf-En-med 'rH-y by- q-ua-+-t--f-iee- teeflHl-eal-- aOO-Erttpe-FVi-seFy- pe-r-se-nnel, :1.0 Section A SP (Revised 9/18/00) Page 22 of 32 IJet,e-HfI+fH>-G ey-mePt-iHg t he qU'A l-+--fi-ea4:.-i--efts--'! . thru 9 be 10'.... Thio '...ork iTt€~i--totff--ic&-~+imited to ,---fII()dif icatiano, additiono, changeo, Ge] ect ians-, .f-H.Htp..~.fnstall ing; . connecting, programming, cuotomizing, ~ifr3T eal.ibr"t+-iH~, ... or plaei~4cft-~aE4on .:lll h.:lrd'....:lrc-aH€lfer ,'of t Wd no E"7" 'e.+ j. i ef'i &r ~'P{lU.i red by tfiese spec i f. lc€a-Eiens _ Tfie COHt j"-ac t-BF-BE -His -5~~r propos ing to perform the SC.W.". ',mrk ffitIBE Be abl",'E-e demonotrJte ffie.-f-Bllm..ing. he-- tfr--~+-a-l-ly cng.:lged 1. n the-€€lHlf'utcr b.:lDcd monitoring Jnd ~ R7l-<Jyotem bw:Jincso, prefer:lbly ao .:lpplied to the municip.:ll W-frEeF :lnd ....aste,{:lter induotFY~ ;J.~- -- - -He-has--per-f-erITIed ..'orh: onsyoteffio of .€omp.:lr:lble Gize, type,-afl€l ('8mf.l-exitY.:15- FeqB-H€d-in this .{'unt-raeE--Ofl--at,--lc:lGt three prior fl-f'B-. eet-& ~. He-has--beeH--iletivcly eng.:lged in the type of \lOrlc Gpecified herein ter-- ato--le-a-st 5 yearo ,- 4,- .He employs a Regio~-~€Ss-ieaa-1-- Engineer, .:l Control Systemo Rfig} neer-; of-an-Eleetric.:ll Engineer to ouperviae or perform the work requir~by thio opecificationo. .".~- --. -f+e.- employs -personnel on thio proj ect '...ho have oucccoofully eomp~~+ f1hJ.nufacturcr I s trJining. coun:;c in configuring and +mfTl cmenti*'t4.fle speeH+e cumputcrs,--RTU&1 0, .::md software propooed reF Ehe-~.rdc t _ 6~- lie fHaint.::lin3 - a permanent ,-- fully staffed ::md equipped oer,'ice -t.::lcllity ....ithin 100 miles-Bf-tAe Project oite to I!\ilintain, repair, ~brate,.:lnd progruffi thcoyotemo opecified herein. '1 ~- -He-~- furn ioh equipment--- ....hich io the product of onc md-ftufa.etclHer"----EB--the maJ(+mum praet--i€al -€*~ Where thio io not p-rart--iea-l-; till equipment of.-a-- givcn ~-]'l7e \..ill be the product of one- llIunufacturer. 8. PFi,oF--p€flOHftanCC at the G-;-N-o-Steveno. Water Treatment PL:mt ,...ill he-useG- iH.. eva-ltlating ,...hich Coffi.rat'-lc-e-r or oubcontractor ~ t fie HeW- WEH k--f-BF--t-b-i-s-P TO j c ct. 9. "The- Contractor -shaH producc all filled out progruffilRing blocko required to aha... the progr:lmming aG needed and required, to add tb€;se--E-wEr..s)'stemo to the-€*-i-s-t-ing City SCl\Dl\ oyotem. Attached io aft- '"*all'lp-le --e-F--+he required- pr€l9Fammilli:}- blocJm ....hich the City requi.r€8 toee--fillcd in and given to the City Engineer ....ith .::Ill (,~maBe-OOFing the programming phaGe. Thc .:ltt.::lched oheet io dB- t-'~le. aflEi-- l~l not intendcd to-shew--all of the required ahceta. Tne Contractc-er-wi l-l- provide .:1..1_1_.E!:..~.:lmming blocko uoed. Trench iIl(L!<e~uir~lI1eQ! s (Not Used) All --t: Fenchi ng foF---l_hi:J proj ectat'-"tfle--G.- - N. Gteveno Water Treatment Plunt sw}Jee-pe-4BFmed- uoing a buckhoe-er h:lnd digging due to the number of e*isting ~J~gr~~)bstructions_ Ne-t~enching machines shall ~bewed ()fi the -fjr-ojf'ctc_ A-36 Other Submittals See also Technical Special Provisions (TS-4) ~;h()p Drawing ,';;ubmittal: The Contractor shall fol] ow the procedure outlined beYowwhen.-ln,;ce,;STng-shop Drawing submittals: f)uantlty Contractor shall submit number required by the City to the rity Enq'n",'r or hie] d('~;ignaterl representative. L. PeproduclbJes: also submit one In addJtion to the required copies, the Contractor shall (1 reptoducible transparency for all shop drawings. Subm i n'"d I rransmi '::ta.1 Forms: Contractor shall use the Submittal Transmittal Form attached at the end of this Section; and sequentially Section A SP (Revised 9/18/00) Page 23 of 32 number eae 11 transmi ttal form. Resubmittals must have the original submi.ttal. IlUmber with an alphabetic suffix. Contractor must identify the Contractor. the Subcontractor or supplier; pertinent Drawing sheet and detai'l number(~;}, and specification Section number, as appropriate, on .,ach ';ubmi' tal form. C:onLrdct or s Stamp ~ontractor must apply Contractor's dppropr j atr'ly s iqned ~)r tni tialed, which certifies that \.'ecif cati.n of Products required, field dimensions, constructiun work, and coordi.nation of i.nformation, is all in wiLh th", n'quiremcnts uf the Project and Contract documents. stamp, review, adjacent accordance Schedul.J ng Contractur must schedule the submittals to Project, and deliver to the City Engineer for approval, the ,'ubfnis. on nf reiated items expedite the and coordinate Marklng Contractor must mark each copy to i.dentify applicable products, models, opt ions, and other data, Supplement manufacturers' standard data to provide information unique to this Project. .~ Variat ions Contractor must identify any proposed variations from the Cont ract d()cuments and any Product or system limitations which may be rletrimenta to successful performance of the completed work. " Space Requi rements: ContTactor must provide adequate space for Contractor dna Engine"r revi"w stamps on all submittal forms. Resubmittals: Contractor must revise and resubmit submittals as required by City Enqineer 3nd clearly identify all changes made since previous submi tta!. DistrIbution: Contractor must distribute copies of reviewed submittals to subcontractors and suppJ iers and instruct subcontractors and suppliers to promptly leport, thru Contractor, any inability to comply with provisions .2 . Samples.: The Contractor must submit samples of fin.i shes from the full range of manufacturers standard colors, textures, and patterns for City Engineer's ;election. Test _and _gepalE R~or~ When specified in the Technical Specifications Section, Contractor must submit three (3) copies of all shop test data, and repair report, and all on-site test data within the;pecif.ied time to the City Engineer for approval. Otherwise, ,he r::ela_t=--~d equiPflIen!,: will notb~_ap2r:-oved for use on the project. ~- A-37 Amended WArrangement and Charge for Water Furnished by the City" Under "General Provlsions and Requirements for Municipal Construction Contracts", B- 6-15 Jlnar1gement ancLCh~~e fCl_r Water ~urn~.!:,-hed_~ ~h"C ('1_9:, add the following: The Contractor must comply with the City of Corpus Christi's Water 'onservation dnd Drouqht Contingency Plan as amended (the "Plan") This DC 1 udes implementing water conservation measures established for changing condit ions The ::ity Engineel will provide a copy of the Plan to Contractor at the pre constluct ion meeting_ The Contractor will keep a copy of the Plan on t he Proj~'ct site throughout construct ion, " A-38 Worker' s Compensation Coverage for Building or Construction Projects for Government Entities r he rfqu lTements .:)f "Notice to ':Ul.' rach,r,; - B'" are incorporated by reference in his SDe(']aJ Pro'. s on Section A SP (Revised 9/18/00) Page 24 of 32 A- 3 ~ c:~r1:;if ic~!~ _~f~ccupancy and Final _ Acceptance (Not Used) F-Re-..j,;s.!afl{~e ef a e-el t:+H-eate--'H-E DCCUp;:1ncY€BF improvements does not constitute f---ifla-l a+Tef*'-a+t-e€" e4~1€--~evementG undeI.-Ccncr;:1} provision B 8 9, A-40 Amendment to Section B-8-6: Partial Estimates General ~rovisions and Requirements for Municipal Construction Contracts Section B- 8-6: Parlial EstImates is amended to provide that approximate estimates from which parti.i' payments wi}] be calculated will not include the net invoice value of 3cceptable, non perishable materials delivered to the Project worksite unless the Contr.ict r provide:; the City Engineer with documents, satisfactory to the City Enginee, rt1at "oh,y^, 'lat th," mat ,'f ial suppl ler has been paid for the materials 'jeliv".-p""; t<J lv, PH)] :L W()f~,',il'~ A-4l Ozone Advisory Priming dnd hot-mix pdving operations must not be conducted on days for which an ozone advisory has been issued, except for repairs, The City Engineer will notify Contractor about ozone alert If a delay such as this is experienced, the day will not be:ounted dS a work day ana the--Ge~or wi-l-l-b-e compeno;:1tcd ;::It the unit ~if\dic;:1tcd ..+B- ~'~a-l- A-42 OSHA Rules & ~ulations it is the responsibility of the Contractor(s) to adhere to all applicable OSHA rules and regulations whlle performinq any and all City-related projects and or jobs. A-43 Amended Indemnification & Hold Harmless Under "General ProvisJons and Requirements for Municipal Construction Contracts" B- 6-21 Indemnification & Hold Harml.ess, text is deleted in its entirety and the foITowing-} s:3ub~:ti-tu t eel inl i eu thereof: Th~; Contractor shall hold the City, its officials, employees, attorneys, and agents harmless and sha 11 i.ndemni fy the City, its officials, employees, attorneys, and aqents from any and all damages, injury or liability whatsoever trum an act "r ,mission of Lhe contractor, or any subcontractor, supplier, na: cria lman, ur heir offield I ~;, employees, agents, or consultants, or any work done under the contract or in connection therewith by the contractor, or any subcontractor supplier, mat.erialman, or their officials, employees, agents, or '~onsultant s. rlh' contractor shall hoLd tilt, City, lU; officials, employees, attorneys, and 19c'nts harmless and shal L lndemnify the City, its officials, employees, attorneys, and aqents from any and all damages, injury, or liability whatsoever from a negligent act ()r omission of the city, its officials, employees, it'orneys, and aqents that directly or indirectly causes injury to an employee ,f "he contr'dete , or d'IY :3Ilbcontractor, supplier or materialman. A-44 Change Orders Should.l chdnge order 5) be If'qllired by the engineer, Contractor shall furnish the (>nginpe1 a compleU bleakdown as !o all prices charged for work of the change order (uni t pr.l ces, hour 1 y r cites, s,~b eontxactor' s costs and breakdowns, cost of materials and equIpment ',vage rdtes, et c, This breakdown information shall be submitted by :ont.I.tC~ .r ,is "l ').1:' i": for ttH' p' i ('i.' of the ('hange order A-45 As-Built Dimensions and Drawings (7/5/00) [a Contractor shall constructed and vert i ;' a I) (, f a 11 makf Jppropridte daily keep accurate records of f3cilitLes, measurements of facilities location (horizontal and Section A - SP (Revised 9/18/00) Page 2S of 32 it Upon compLetion of each facility, the Contractor shall un" spt of dlrect prints, marked wi Lh red pencil, dimensions dnd locations of all work constructed, As a drawJngs slall Include the following: furnish Owner with to show as-built minimum, the final Hor ::ontal and ,'ert lca di mens ions due to substitutions/field ,'haIiges ;'.&+ .,'lTaH"Jes--in +'-€ftt4pmenE-and G+mCnOiOllO' due to oubotitutionn, 0-1- ,u"~lat-{..~IL 'W-E-a on all inoto.lled equipment, (4) Deletions, additions~nd changes to scope of work. (5) i\ny other changec; made. (6) Hor zontal dnd vertical dimensions of existing utilities affected, , ro~sed or found during construction. A-46 Disposal of H~l~__Chl~rinated water (7/5/00) rhe Contldct:or 5.;l1a11 be responsible fOI the disposal of water used for testing, disinteclion dnd lIne flushing in an approved manner. Contaminants in the water, parti,'ul a rl y high 1 ev('ls of chlor LDe, wi 11 be used for disinfection, and may exceed the permissible limits [or discharge into wetlands or environmentally sensitive areas These are regulated by numerous agencies such as TCEQ, EPA, etc. It will be the Contractor's responsibility to comply with the requirements of all regulatory agencies in the dispm:al of all water used in the project. The methods of disposal shall bf' submitted tc the City fUI approval. There shall be no separate pay for disposal of highly chl,)rinated water. Contractor shall not use the City'S sanitary sewer ;ystem lor dispnsal of contaminated water, A-47 Pre-Construction Kxploratory Excavations (7/5/00) Prior tc any ,=on,;t,uc' ion whatever on the project, Contractor shall excavate and expose ail existing pipelines of the project that cross within 20-feet of proposed pipellnes of the project and Contractor shall survey the exact vertical and horizontal location of each crossing and potentially conflicting pipeline. For existing pipellne,~ which paraLlel and are within ten feet (10') of proposed pipeli ne;; of the proj ect, Contractor shall excavate and expose said existing pipelines at a maximum of 300-feet O.C, and Contractor shall survey the accurate horizontal and verticdl locations uf said parallel pipelines at 300-feet maximum o.c Contractor shall then prepare a report and submit it to the City for approval indicating the Owner at pipelinec; excavated and surveyed, as well as the approximate station thereof, distance to tIlE' pavement centerline and elevations of the top of existing pipelines Contractor shall perform no construction work on the project until all exploratory excavations have been made in their entirety, the results thereof reported to the Engineer and until Contractor receives Engineer'S approval of report. Exploratury excavations shal j be considered subsidiary to the unit cost of the transmjs~;ion main pipe Any pavement repair associated with exploratory excavations shall be paid for1cc)rding to the established unit price of pavement patching. Contract;;) shall prOVide all hJS own survey work effort (no separate pay) for PxploTdt,.tyexCaV3.t,lon, A-48 Overhead Electrical Wires .7/'1/00) ','ontr-a! t,,! shaLl :ompl, with dl] U:-:HA safety requirements with regard to proximity )f construction equipmult beneatli ')'J(~rhead electrical wires. There are many overhead "ires u'E;sing tht: 'on,:;tructi'lT] mite and along the const.ruetion route. Contractor shall Ise all due diligence, precautions, ete , to enSUle that adequate safety is orovidl'd for all of h s employee~ dnd operators of equipment and with regard to '>!)Sllrjl'g ~hat '10 damag. to exi~3tin'l)Verhead f'lectrical '_lires or facilities occurs. Section A - SP (Revised 9/IB/aO} Page 26 of 32 Project, and deliver tn t-hp l'i hr J;'nn, n==~ +~_ ________, C-^.p'C:u~ Lt::' Lne '.~ontrdC! it' shall cooroinate ris work with CP&L and inform CP&L of his construction schedule with regard to said overhead lines ;omc ".Jtlhead ]l[lC'F a'e shown III the construction plans, while others are not. It shall Q,' the Contractur' s 501 e responsibi 1 ity to provide for adequate safety with regard t over'head lilies whether shown in thl plans or not. A-49 Amended "Maintenance Guaranty" (8/24/00 ,Jnder >'Ceneral Provisl,ms and Requirements fOI Municipal Construction Contracts", B- 8::..ll_r'!ain~na.llC:e GlJara_~, add the following T'1f' Cont.ract or' 0 guarantee I s a separate, addi t ional remedy avai lable to ueHetlt che C~ty of Corpus Christi. Neither the guarantee nor expiration of the jUdrantee period will oper'ate to reduce, release, or relinquish any rights or remedies avail.able to the City of Corpus Christi for any claims or causes of Ie. ion against tne ContractoT or any other individual or entity." A-50Tec_~ica~cial Provision~ The requirements of "Technical special Provisions" are lncorporated by reference in these Speclal Prov sions A-51 Additional Time of Completion/Liquidated Damages Information Re1ated to ~ight-of-way and USCE per.mit Acquisition by the City The Con! lacLor is herf,by notified that time is of the essence on this project. Currently, the City is in the process of acquiring utility easements and Cayo Del 050 crossing Corp of Engineers permit for this project (status will be provided at the Pre Bid Meeting). Within ten (10) calendar days after receipt of the written Notice To Proceed, th,J Contractor shall commence construct.ion within the areas of the project ~'hat Ire within exi,;ting right of way, existing or newly acquired f"'>asement A.5 noLed in Section A 6, the working time [or completion of the project shall be in 220 Calendar Days In the event that the Cayo Del Oso crossing Corp Per.mit and/or easements for the remaining segments of the work area have not been acquired prior to the Contractor completing all other portions of the work, then the Contractor shall place construction operations on hold until said acquisition has been accomplished. Calendar days will not be counted against the completion date while construction is on hold due to right-of-way acquisition. Once the Contractor has been notified that right of way ,ind/or Ccrp penni t has been acquired for the remaining work areas, and that "on,;tructiOIl "hall commence again, the Contractor shall re-mobilize within 5 working :iays (not counted against the complet.ion date j,mit) at no additional cost to trw :ty ~xcep' f, r the Jemobilization unit price. The Coot t actor shall t hen proceed to complete the remainder of the utility work in a timel ~anncr, within the remaining allotted calendar days. A-52 Contaminated Soils if, dilr ng the nmstn;ction, an area is suspected of a high level ot contamination, then t h, Ci 1 Y 'wi Jl ha\:t; the a rea uosted. It t:he area proves to have a high level of contamination. the!: tLe Contractor shall comply with the regulations of the TCEQ who !Jas JUt Ji,d,ction cOIH:erning pol icies as to the reuse of this material, the Contrdct r ';hall foll,w the following procedures: Section A - SP (Revised 9/18/00) Page 27 of 32 1 M.iLe~ial Reuse Excavated material that contains indications of elevated Jic'vels of contaminatiOIl may be utilized as backfill for excavations, up to 24" f rom the surf.lce of the finished grade. It will be the Contractor 's 1 '"spons ib! 1 i'~y '0 incorporate as much as possible of the contaminated material 1 -,::0 the backf 1 n. Clean material with no indicat ion of contamination shall b..: used with tLe top 24" o. the trench. All materials used for the backfill (,t excavations :hall a: so conform to the trench embedment section shown on the )[\s t II. ('1 j or dl lwi ngs 2 \ 'n -Si te Stockpj .es: Excess material [rom excavatj on, whether non-contaminated ;j contamuldte;] WIth dny detectable concentration of contaminants, shall be handled in such a way as '.0 prevent. run-on, runoff" and infiltration of c:ontam i.nat ion r rom precipi t at ion. Contaminated stockpiles shall be underlain hy plastic, with a rlean StHl berm covered with plastic around the perimeter. The contaminat"d stockpiles shall be covered with plastic and secured to prevent LOS!'. oi the ccvel ciue to wind or storms. Maintenance and cleanup of any storkpile ~reas shall De the responsibility of the Contractor. ! . sposal c,f Excess Non Contaminated SOIl: The balance of any non-contaminated soil not used j n backfill. shall become the property of the Contractor and shall oe hClnled of f dnd ,[ Lsposed of by the Contractor at the designated Glsposdl site. ... r I sposal of Cmtaminated ~>oil: All costs associated with excavating c)ntaminated soil, transport_ing contaminated soil, landfill disposal fees, constructing and maintaining a stockpile in the required manner, and cleaning L.p the project site after the contaminated soil is removed shall be paid for by the cubic yard as measured by the City Inspector. Excess contaminated soil will be transported by the Contractor to a safe disposal area to be designated be the Ci ty 5. OSHA TraIning: Contractor sha 11 be responsible for providing proper OSHA hazardous waste trainirlg that is required for construction personnel working i, contaminated areas A- 53 Fences All existing fences dffected by the work shall be maintained by Contractor until cornpletlon of the Nork. Fences which interfere with construction operations shall not be relocated or dismantled until written permission is obtained from the owner of the fence, and the period the fence may be left relocated or dismantled has been agreed upon. Where fences must be maintained across the construction easement, adequate gates shall be installed Gates shall be kept closed and locked at all times when not in u:'e. On completion of the work across any tract of land, Contractor shall restore all fences to their original or to a better condition and to thei r original locations. There shall be no separate payment for removal, replacement or repair to eXLsti.ng fences A-54 Protection of Public and Private Property Contractor shall pIOt{ct, shore, brace, support, and maintain all underground pipes, condui tf~, dra Lns, and other underground construction uncovered or otherwise affected by his onstr1lctron operations. All pavement, surfacincj, driveways, curbs, walks, buildlnCjs, uti.lity poles, gu}c wirE's. fences, and other surface structures affected by construction operat Ions, t)gether with all sod and shrubs in yards, parkways, and medians, shall be res ored to their original condition, whether within or outside the easement. All replacements shall be made with new materials. No t.reel shal i be removed out,; ide t he permanent easement, except where authorized by Eng inpel \'lhenever pldct icable, Contractor shall tunnel beneath trees in yards and parki ng!' when Oil or n"ar the ] i ne c)f trench. Hand excavation shall be employed as rteCessalY t,) prevent injury to t lees. Trees left standing shall be adequately prote,t,d aga nst eJamaqe frUIT c(t];rruction operations. Section A . SP (Revised 9/18/00) Page 28 of 32 ContrCicl ur shall be responf;i bie for a 11 damage to streets, roads, highways, .,houlder;;, ditches embankments culverts, bridges, and other public or private propC'> t'> regardless, f locat ion or character, which may be caused by transporting ;"quiprnenL, malerlals, Jr workers to or from Lhe Work or any part or site thereof, ..:heth,!!: by hlTH U1 h Sub""ntrdc tuu;, Contractor shall make satisfactory and iccep aL1e 3.rrdJlqemen s 'witl t h,; owner of, or the agency or authority having ur isd i ct ion .we r', thc' damaged peopert y concerning its repair or replacement or payment of costs incuJ red In connecl:ion with the damage. All flre hydrants and dater cont rul valve,; ",hall be kept free from obstruction and ~vaildblp for use at 1 tImes, A - 5 5 Securi t)' Contract ''Cquipmen t persons shall bo re;;ponsibLc t01 protection of the site, and all Work, materials, and cyistinq facilities thereon, against vandals and other unauthorized No claim shall be made aga I nst Owner by reason of any act of an employee or trespasser, and Contractor shall make good all damage to Owner's property resulting from his failure tc provide security measures as specified, -Secur 1 ty measures sha jIbe at j eas t equa I to those usua lly provided by Owner to protect his existing facilities during normal operation, but shall also include such additional security fencing, harricades, lighting, and other measures as required to protect the site A-56 Access Roads Contractor shall establish and maintain temporary access roads to various parts of the site as required tu complete the Project. Such roads shall be available for the use of all others performing work or furnishing services in connection with the Project, A-57 Parking Contractur shall provide and maintain suitable parking areas for the use of all construction workers and others performing work or furnishing services in connection with the Project, as required to avoid any need for parking personal vehicles where ('hey may interferf' with public traffic, Owner's operations, or construction activitic,s. A-58 Noise Control Contractor shall take reasonable measures to avoid unnecessary noise. Such measures shall be appropriate fur the normal ambient sound levels in the area during working hours. All construct j on machinery and vehic Les shall be equipped with practical sound,muffling devices. and operated in a manner to cause the least noise consistent '.vith efficient performdnce of the Work, During construction a"tivities on or adjacent to occupied buildings, and when appropri"te, Contracto shall erect screens or barriers effective in reducing noise in the building and shall conduct ~is operations to avoid unnecessary noise which 'night nr crfere \'" it h t ,e act i.J i l i "~, of bu i I d i "9 occupant s , A-59 Dust: Control Contract'>l shall tdke reasonable measures to prevent unnecessary dust. Earth surfaces subject La dusting shall be kept moist with water or by application of a chemical dust suppressant, When practicable, dusty materials in piles or in transit shall be covered Lo prpvent blowing dust, Section A SP (Revised 9/16/00i Page 29 of 32 Bui ld i nqs or operaLinq iaei I l tiel; adequately plotect~d from dust panel:;, fJr' similar equipment shall venti la' ion shall be ;ncluded with which may he affected adversely by dust shall be Existing or new machinery, motors, instrument be protected by suitable dust screens. Proper dust screens. A-60 Temporary Drainage Provisions Contractor shall provide for the drainage of storm water and such water as may be applied or discharyed on the ~ite in performance of the Work. Drainage facilities shall be adequate 0 t'revent damage to the Work, the site, and adjacent property. Exist i.nq drai nage .:hannels Jnd conduits shal j be c I caned, enlarged, or supplemented 'is nec'essary to cat ry all incredsed runoff attributable to Contractor's operations. Dikes shall be constt IlcLed as n(:'cessary to di vert increased runoff from entering adjact'n' proper!)! (exI'ept in natural channels), to protect Owner's facilities and the W"rk and to dire..t water to drainage channels or conduits. ponding shall be provided as necessary to pre'Jent downstream floadi ng. See a 1 S., SteeL: OJ' 0 560 of the 1'echnical '3pec if icat ions, Storm Water Pollution Prevent on A-61. Dewatering This ,tem shall be measured by the linear feeL of trench as described in Section A-4 where dewatering is needed to keep the excavation dry, as approved by the Engineer, and ~~hJll include all costs to provide a dry foundation for the proposed impro'Jernents. Storm water that enters an excavation can be pumped out as long as care is taken to min lmize solids and mud entering the pump suction and flow is pumped to a location that a lows for sheet flow prior to entering a storm water drainage ditch or f;torm water inlet. An alternative to sheet flow is to pump storm water t<, an area where ponding occurs naturally without leaving the designated work area or by a manmade berm(s) prior to entering the storm water system. Sheet flow and ponding is to allow solids screening and or settling prior to entering a storm water conduit or i.nlet. Storm water or groundwat.er shall not be discharged to private property without permission. It is the intent that Contractor discharge groundwater primal ily into the existing storm water system, provided that the quality of groundwate is equal tu or better than the receiving stream, Oso Creek. Testing "fgroundwater quality is to be performed by the City at the City's cost prior tc. commencing discharge and shall be retested by the City, at the City's expense, a minimum of once a week, Contractor shall coordinate with the City on all testing Test will also be perfol~ed as each new area of construction is started. Options for disposal uf groundwater by the Contractor would include pumping to the nearest sanitary sewer system or discharging to temporary holding tanks then truCkl nq to a san I talY sewer or wastewater plant If discharging to temporary holding tanks and ru:'king t.,) a c3anitary sewer or wastewater plant, the costs for these oI,crations shall be negotiated. Other groundwater disposal alternatives or ,;01 ut or:: may be approved by t:he Engineel on a case by case basis. Prior j) Pumping qro,lndwater from the trench to the sanitary sewer system the Contractor shall contact Mark Shell 857-1817 to obtain a "no cost" permit from the Wastewater Dept. City wi]] pay for any water quality testing or water analysis cost requited The pelmit will require an estimate of groundwater flow. Groundwater flow an be estimatec by batIng a hole or excavating a short trench then record water level short1y after compleLlon, allow to sit over night, record water level again pump ho] e or :' rench dry to a holding Lank or vacuum truck then record how long it takes to f 11 to or1gina] level dnd overnight level. A-62 CUltural Resources The r,ul E' of the pipeline at apptoximately Station 76tOO is adjacent to a known drcheojoqical site The proposed pipeline route has been selected in consultation with ;,n Archeoloqist to avoid this site, but the possibility still exists that the Contractur may encounter cultural resources during construction. In the event that the C..>nt [aetoe encuun! ers cul tural materials during construction, the Engineer must De not i j ied ~nd w"rk mw;! ;"]se fl the immed iate area, work can continue in the Section A - SP (Revised 9/18/00) Page 30 of 32 proJel area(sl;.il1er cultural resources are not present. The Engineer will be respon"ib]e fer ('nnl'. ::tinS t'lP cttdte Ilistorical Preservation Officer. A-63 Tasks Associated with Easement Acquisition The C; Y uf corpuc; CLristi 11,IS ,,,leeted t.o ins: all the new water line in a separate, cant lnuclUs util itv easement ,donq 'he route, as shown in the drawings. This utility easpmFnt and piHcllll'1 temporary construction easements are being acquired from landowners along the water line alignment As part of the easement acquisition, ~;pecific requircrrent' and notifi::ations have been negotiated with each of the ]andowflers. These rcquireme'lts and notifications are listed in an Appendix C table ent iti ed Special Provisions .md Contractor Obligations Report. This report will be updated and provided 3gain to the plan holders in a later Addendum prior to the bid date. These requ.lrenents include. but are not limited to, notification of the landowners 24 hours in advance of construcLion activity, construction activity limited to ROW, DE and TeE, relocate existing fences and maintain and restore to original location restore exist.lng driveways relocate existing aerobic sprinkler system (2 tracts) dc.uble dit:ch top soil. limit removal of trees, do not leave gates open, remov~' existiny wat.er well and sprinkler syst.em (1 tract), clear easement of all t.tllsh and debri ''', dispose of all garbage, and maintain fencing to prevent I ivesi: ock from escap 1.ng. As of December 22, 200:', 33 of the 37 total easement dcquis:ition tracts ft,y this project had been completed. See the table in Appendix C which lists the easemenL acquJsit1.on status and the contractor obligations by tract The easements already acquired cover over 68% of the total project transmission main length For each of the presently remaining tracts, by the end ..:,f January 2006 the easement: acquisition will have been completed or the ::'ondermat i or. proceed i ngs \~i] 1 be underway A-64 pe:rmits The C,ty of Corpus Christi has a fully executed Miscellaneous Easement ME 20040047 from t he General Land Office (GU)) This state agency regulates the use of state- owned land. r, copy of t.hat ea[;ement is included as Appendix A of the Contract Documents. The miscellaneous easement is issued by the G. L.a. and indicates procedures and allows work on state owned land. The miscellaneous easement allows the Ccty to maintain the waterline across state o'#ned land for the term of the easement (usually 50 (ear tel~) Key requirements of the GLO Easement are listed in the notes on sheet 1 The Ci'Y of Corpus Christi ha[; ;;igned and returned to the U.S. Army Corps of Enginu,rs (USACE)Perrit No. 2165S A copy of that Permit is included as Appendix B of the Contract Documents rhe IJ S. Army Corps of Engineer'S regulates wetland and water crossings dnd ssues permits that indicate Lhe procedures for working in waters (wetlacds and water rossings) of the United States. Key requirements noted in the USACE Permit have bef'r} added to t.ne appropriate drawing sheets (See Sheets 8, 10 thru 13 qnd 22 thru 2':>1 The Contractor is limited to a 50 foot wide work corridor as ~lot !-:id n ~;ht'et s B thru r ~ {Hid )2 thr u ?,ll It is the Contractor s responsibility to review the entire USACE permit along with the ME issued by the GLO. Prior to construction the Contractor is required to obtain a Notice of Intent from TCEQ as noted in Section 01560 Storm Water Po~lution Prevention. Section A - SP (Revised 9/18/00) Page 31 of 32 PROJECT OWNER ENGINEER CONTRACTOR: SUBMITTAL DATE: APPLICABLE SPECIFICATION OR DRAWING SlfBMITTAL TRANSMITTAL FORM SUBMITTAL NUMBER: SUBMITTAL Section A SP (Revised 2/19/99) Page 32 of 32 PART C FEDERAL WAGE RATES AND REQUIREMENTS Page I of2 Gene! 1] Deci~.'l():- \/uml:er TX0300"J 06!J3/2003 TX39 Supe' ;eded C;, TlP r a j D( . i s i c'n \10 ['X. () 20039 Stat. l'EXAS Cons! 'I' 't i ,'f] ~YJ:e HEAV' Count J' les NUECE,; SPN PATRIC'TO HEAVY CONSTRUCTION PROJECTS (including Sewer and Water Line Construction and Drainage pr0jectsl Modi f l( dtion Nurnbe, Publication Date 06/13(2003 COUNTY J ,'s) NUECE~ :;.1\1' PATH I 10 SUTX: 'IS A U /0 11,8 CARPENTERS (F.xcllldLng ;"orm SettIn,! Rate,; $ 9 05 56 11 37 ') 64 I 68 9 2 1 8 72 Fringes CONCRETE FINISHER ELECTF C AN 2 58 LABOREkS Commun Ut il t POWER EQU l PMENT OPERAT' JRS : Backhoe. Mote . ;r'ader WELDERS Receive Ii) e pn.,s',ribed for craft performing operat ,on to wh i ch 'Nel ling is ineJ denta.l Unlisted JassitJ."ilT iOiCS needed ((.( work not Included within the scup" ot the LlsSlficatioIls li,;ted may be added after award miy as provided in the labuI standards contract clauses :2 9 CFP ') (a I (1 : I.! }) ln the ] ~;ting at,wf', he "c,U def_!l'lnation means t,hat rat.es listed under that ielen iLier ell Ilot t'E'flect collectively bargai!:cd wage and fri'lge benefit ldtes. Other designations indicate uniun3 ,dlo!;e ate!! helv.... he"Tl determined to be ,Jrevai ! i "0. /lA,:E DETERM [Nl\Tlc'N APPE!\!,S FP( iCESS ) Ha 'her ,y'P'\ ,n nitial dec'i"j()n in the matt.er':' ThLS can be' . an e>.i,:ting pubiishec wd'je (jetcrmlIlatioTl . a su ,-vry und"r I 'fillg d wagp det,- ([wi nation http://ww\\ _ wdol. gov/wdollc>cafi Icsidavjc>bacon/TX39 .dvb 1 2/1912005 Page 2 of 2 .. ~ ~"';1ge and HOL poP i t Jon on ,3 ,. a f:",>rmanc( l'iv sian lel:Le, setl::ing forth a ""Jeje JetermindLiun matter (;J~idi 1 iona 1 (' lS<-:;1 f i CClt.10n (-Inri rat.c; rt.: ;\q On" c'''~:y tf>l'-'t,,'d c.atters. initial ':on~act, including requests for oummarlee of surveys, ShOldd be with the Wage and Hour Regional Office tOl the area in WhlCh the gurvey was conducted beca'j8C those Regiona Of f ices hav.: responsibility for the Davie, fji<con survey program, rf t~he response frorn this initial cont;;cr is not Aat "fdet,ory, ,-hen the process described in 2,J and '<hould b'" 'oJ owed With r"<lard to cny other matt"r net yet ripe tor the formal process descrlbed here, initial contact should be with the Branch of CunGtruct.icn Wrlqe !Jeter~in3tion8 Wri~e to: Branch of C'oriHt.ruction W,..ge D~tr:'rminationB Wilge and Hour D::i,vision lJ S, Department of I.abo r 200 COilatit\1t'on Avenue, N, IV Washington D C 20210 2 I (Ute dIlS\..re t' to 1 he ques Lion I II 1,) is yea. then an interest:ed party (thoE'c affected by the action) can request: revi,~.w and ,r€congi deration from the Wage and Hour Administrator (See 2', CFR P,nt 8 Clud 29 CPR Part 7) Wr5 te to: Wage and Hour Administrator U, S Dep,u:'t.ment of Labol 20e COIl8t itlition AV.~nue, [Il 'itj, Wasbington. ). C. ,W21D The request should be "ccompanied hy a full stat:ement of the inter'esLed party's po.;tion and by any information (wage payment data project de"cr ipt ion, area practice material. etc,) that the requF:6t or cODsideTf' rr levant ~o r-he issue, J,) t the Jeci~LlOL ot the Admin,l,atrator is not favorable. an inl::eu2Bt.ed pact y m<>y appeal directly to the Administrative Review Board ! former:ly r-hf' Wrlge Appeals Board}. Write t.o; 7\dmin'i~c;traL i ve Rev-lp'..... Hoard U 3, Department of Labor 200 COll,;t llution Avenue, IV W. Wag~inglcn. 0, C J021D 4,) 11 decislOnR by the Administrative Review Board are final, END OF GENERAL DECISrON ::J I1ttp:J I WW w wdoL go v /wdo Ii sea fiJcs/d aVlsbacon/TX39 ,dvb 12/19/2005 A _G_ R E E M .~-1L1' THE STATE OF TEXAS COUNTY OF NUECES .;; TH . -~ l_"\.;,"':; s;::[,,: erl-< r f'~ l~ t :h 28TH (:1 of FEBRUARY, 2006, by r::le t v CITY OF CORPUS CHRISTI t t! CC Inty of Nueces, State of .3 , n t i ]0 tl t 1 J ty r'1anager, termed in the ca t ". r-. i S.J. Louis Construction of Texas. Ltd. " i"0 ~ 3 ' y- " '-.. , upon these terms, )rm2 a I 1, $8.476,046.00 by City and other '::ja ] ( .> n i~~ I , 'It 1 cl t c VIi 11 construct and et c. v " 2: SOUTHS IDE WATER TRANSMISSION MAIN PHASE 5 RODD FIELD RD. TO WHITELEY DR. PROJECT NO. 8391 (TOTAL BASE BID "A": $8,476,046.00) :'d~n 'j f j c,tions 1n a good and \ ""~ maLl k 'e.':' j l' ns set out in their ,j 'hed d tiS ~ j '-',,) p>',ense such materials, ces 1, e attached C::ontract !: ,:':eI't I ' ,,\ h Contract Documents Ilde r' C1 d Is~ructions, plans and S) he n " d 1'1 >nd~ ~l , ng3, h. ,. 'll ",a:) \ ,-, - ~-d ci ~ ueprints, and other nl )11 C' addenda, and related ,) r t r ~--:1 F this project and are - j iT1ent t h ~l a Dc n rec:ITlent ge 1 i" ' . 51 AM; F',iQf:tJ /40 Sotrl'asIDJ: WATER TRANSMISSION NAIR PlIASE 5 ROOD rl:ELD RD. '1'0 1IBI'l'KL&Y DR, BASE :arD lA' BAR lmAPPKD CONCRETE SREL CYLDlDER PIPE OR STEEL PIPE I II III rv V BID QTY " UNIt' PRICE I'l'DII lINI'!' DESCRIPTION BID 1: 'l'&K EJCrUBION A~l 28,450 42" dia. fransmis3ion Main, /32, ,~ 3: 7-'>:;: t/a? ~ Lf complete in place per LF $ ~.~ '- - ~ ,-.~ --_.~. ._~_...__._-_._---- A-2 67 42" did, 0.10 to 5.00 Pipe Eli Beve 1, cCmplete in place psr 32., ~~ ~ Ii/'/. ~ EA $ - - ~ -'~-~-'--- ~- ~- '-~ A '" .. 42" dies. ~ .10 to 11.25" Pipe ~ .:a. 7; (; 0:/. .~ EA Bend, cOrllplete in place per EA 9CXJ. $ . ... --- - '. ~-- '-"-_..__.~- .- A-4 10 4Z" dia. 11 .260 to 22.50 Pips Eli. Bend, cOJ'Aplete in place per EA ~ 9~ (\: $ /9. 000. C.E. -..- - r---- - - "-'- - -'- ~. -..---.----.......- -....'"--~,- A-5 21 42" dia. 22.60 to 450 Pl.pe ~ (p 3.. <:100 EA .3 ex<? .<Jt. Bend, r;oltplete in place per EA $ ---- .. ~ -' -.-..- ------.. -"1-- ~--'------ A~6 1 42" dia. .45.1. to 67.5" Pipe EA 2 qw, 'E- " ~ 900. ~ Bend, cOnlplete in place per EA " -"-- "- -- ~ - ~- ~-------~---~ --,.-- A-7 1 61.6. 90~ ! FA 42" dia to Pipe 5" OW. $. 5oOt? .~ Bend, cOlllpJete in place per EA - '. $ . . l------ '-. t---~-",. -+--. --'-"'~- A-R 1 4"" x 24 " Pipe Tele, compl@te EA /, tOJ. :'L ;; 8'(10, ii in plac@ pf'r LA $ ---- ..--- r--- _. -- -~- .._,~ '---. A-9 1 42"x16" Pipe Tee, complete in EA Lta? ~ ~ fa? ~ place per- EA ~ - ---- ._- r----- -.. --_..--~ ..- -~-- .~ A-10 1 42" ripe Plug, complet.., in 'i2aJ,~ ctZCP lie EA place per L3 $ -.- - ~- ---.- - ------.._----..- --- -,.--- -- -~ '--_.. .__ l.... A-ll 1 42" Butte;,rfly Valve, complete EA ~ place P8.t:' EA 2Jao, (j;' $ .2~oro. ~ ~-- --------------4-- ..-.,_~_.____ lR<<visl!l~ Proposal rorrn Page 3 of 1 ~ ADDENDUM NO. ~ '__ Att.ac:luaent. No_' Page :3 of 1S '01_ , ,1 () b 1: 51 AM; FJage 29/40 SOOTllsmB 'llATBR ~SMl:SSION HAIlIt PHASE 5 ROOD FI&LD 1m. TO lIBlftI.JtY DR. SASB BID 'A' BAR WRAPPED CONaETB STDL CTLINPG PIn: OR STEEL PIPE I II III XV V BID O'I'Y " UNIT PRIO DESCRIPTION BID ITEM EX'rBN9J:ON ITEM '(]N]: T l\ - 12 165 "Install.Only" 66" Dia_ Casing 20 ~ 13cJq S!! LF Installed by Opsn Cut, $ complet~~ace per EA ._,-~..-_.-- --.-- - .- "---.--- A 13 315 66" Dia. Casing Installed by LF boring ot" tunneling, complete ~0.;' ;ZOi, 7 SO, ~ in place per LF $ t-----.---..- i----- -'-'-' '-- '-"'---'-"-~. ......-.-.. ~--- -- ,- -- 1\-14 12 Air Release/Surge Rf'llief i:1\ Chambe r I complete in place pex. __ t '1m c~ IILjW. e!Z EA $ -~- c-__. --.--- -- --'-',- -._---- ---- ----.-.--~.. .~ -.-----_.- n~_ --._----~ A 15 " Blow-off:Valve, c:llnplete in KOa7. ~ 3Z,oCO ~ EA Eac~ ..E!L EA $ r-- - -- -- ....-.--.......--..- ---- A-16 2 Blow-off Valve with 90" Ell, EA complet~ in place per FA K 700. CcS- I~ lfc10, (,'<C $ f--- - .-'- f---- -- f--- -- - .----...--.----..-...- .-.----- A 17 5 Guard PO$t, complete jn place L 5'00, JU- EA ~, ~ $ per EA - ----_..- -~._.. A-lB 13 Metal Post with S_ign, complete /OO."'!.- &3~ ~.;.~ EA in .E.~_ac_e...E.e. r EA $ '----- _..~ -_._.~ ft-19 1 Cayo Del Oso Crossing, ~ ~'1O;O(X], S5- $_Z.t7~ 000. 0? LS complete2Il place per LS - ..--.,., e-__ A 70 1 24 " Dia. Gate V"lv8, complete ;&;,kv. ,~ / ~ ta:J. .'1: EA in place per EA $ ~._- - - - ---- -- " -~~---- .-.---- A-21 1 16" dia. Gate Valve, complet.e ;; 7Q7 ~" EA ~ 7m ~ $ in phc8xer~__ < . -..--- 1--- - ----'-'---. A-22 1 24" x 12- Tee, compl,-,te in Zav, ~ EA 2Q2), - $ place pet EA , ~ . -- -------- ---~.............---,.- -.... -- ~9V1s@~ proposal FODll Paq8 4 of 15 ADDENDUM NO. L At:t:aohman 1; No.S: ~ . o~ 15 JtJe, 2106 1:51AM; Page 30/40 SOOTllSIDE WA!'D TlUUfSHISSION NAI.:R PRASE 5 ROOD FIELD RD. TO WRYTBLBY DR.. BAS!: BID 'A' BAR lfRApPED CONCRB'l'B SDKL CYLINDU PIPB OR STEEL PIn Concrete Curb and Gutter. cc:mP~l:l~=__ ~n place per LF ~~e4o i Concrete Sidewalk. ;omplete in ___~e P~'SF..__ I II BID QTY '" ITJ:N UNrT A-23 1 EA A 24 1 RA A-25 2 EA -'-',-".."..-- 1\26 2 EA A~27 90 LF ----_.~.,-_.._-- A-28 7.0 LF A-29 20 LF A-30 ~y150 A-:i1 3650 Sy - - -~--3~2' 89-; BY - - A -13 . 420 ! SF A.34 460 LF A 3S III D2SClU:M':tON 15Hx1~n ~educer, complete in place pex! EA 12" Tee, complete in place per EA -...--.- .-... '--...-.. 12" Solid sleeve, complete in place per EA 24" dia. Ductile Iron Pipe, cOmplete lin place per LF 16" Dia. Ductile lron Pipe, oomplet:=El place per LIi 12" Dia. Ductile Iron Pipe, cornpl_ete ;in place per__r,F _ 6" Lime Stabil. SUb9rade, complete in place par SY 8" Flexib1.e a~li"', ~ompJ et e in plaoe per,SY 1--1/2" HMAC Pavement, complete in place pel BY I .--.0.....- _,.__~ 6" Concrete t?lIVement, complete in place per SF ~Vi"e~ Proposal Iform Pay'" 5 of 15 IV UN!:'! ParOl 310 ~ $ -~-._~.~---- '1;x; ~ $ -------- 2/$. E!.. $ /, 30:? ?$ $ /7$-. #~ .$ ---~.- 70.':;" .$ /90. co.: $ //.~'::! .$ :;>. 20CS $ ZOo i\:- S -7- ,t' .- --~.._-._-_.__..",.~ ~_3J <T~__ .$ ....- ,;:;,: L .- ..::J. --~--"'-'~"---,-~ v BID l~ &xTI:NSION ,3/Cl. 9!i: Lf3o, ~ If Zt:-1O. !\: 2/A/)-c\z' ":/ (,p(..{...l. 1'5; 75"0. 0;:. /, '-I txJ. 9!- ~ 8'cZ2 -~;: 17Z;-0 ..;:. ... . 73cvo ~ ~ . ~7 '" ~ ... fa?- $ 2: q</~ ~ 12 ~a? ~J2- $ Cj'2a::J. .~ AOOI:NDUM NO. +.. At.t:.aoha.nt. NQ ... Page 5 01: 15 (; ,j 1b ()~: ~ },1 ;)1 -06 1 :51AM; PdgE ;31/40 SOUTKSJQE WATER TlUWSM1SS:IOH NADI pBASE 5 ROOD FIELD RD. TO lIBITELBY DR. BASK BID 'A' BAR WRAPPED c:t<>>tC~'t& STEEL cnnmD PIPE OR S'l'UL PIn ~ 1I sm on " I'fEM UNIT }\-36 13 EA III DIISCRIP'l'I.ON -- ------ ,- ...-37 15 EJl. Reconstrtict sanitary Sewer Lateralsf complete in place per EA _ _~ __ ____ Reconnect Sanitary SBwer Laterals, cOlDPlete1n place _____ ~r ~ .~__- __- ---~--- A- 38 31,000 Trenct1 Safety, complet_e in LF place pe;r LF -----~- ._-- }1,-39 tf'SSO Dewatering, complete In place 1--__ __ per L!.~___._ -. - ----- A-40 ~~, 900 Geot.e~t;l;lef complete in place per s~_____ _ _ I---- ",41 15,450 SY f---- - - .- ~_.._-- A-42 2 El< Crushed Stone, complet,e in pl~ce p~r Sy -'--,-- ~~ rv v UNI'l' ~ICE BID t'.rBH &X'tENS:ION 3zm.~ $~ /, (p.c:V, o~ I /V'>'''J ,"3- / l./l,;V; ~- $_I5:ax? e 01 ,- 3 /0. ~ /9~ s:::. $ 01 -~----- $ 01 , :c-- 301. ~ 11;;'1 ?2- $ ,0.- $ 1-- A-43 R8mobtl~2:ation, ~ornplete in 5A/Y'1 2!:- place ~r EJ\ ~, --'-~~~--'- - - --~- ----- ~ $ /aooo, ""'- 500 CY Djsp03~1 of contamina~ed Soil. __~_omple~in p1-ac~Y~E_~-- ----- 1\-44 '-- w.t:.r Utility Allowance (Mandatory All0wa4oe), complete in place 1 per LL- ~ransmi..ibn Main Matertal (Circle 1 LS L-... '-::;: ~, 2. 5"'cV .~ " " $ an nnn 50,000 one) : ~oftc:r.tAt Cy1. lJipe" ) or "steel Piperl TOTAL BASE 810 'A' $ 8:'17&"fJ'IG. _S- NOTE: The abvve unit pI~ces must Jnclude all labor, rnaterial~, baiting, removal, overhead, profit, in~l1rance, etc., tO~over the fini.'!hed work of the several k.inds called for a.nd the Owner rellSrV89 the right to increase or decrease the quantity of any bid item. The above quantities <ire approximate and may vary from the final quantitie5. 00 not order- ~r1al based on these approximate quantitiel!l. ~eVi$'3 ?lojJ<>eal Form Page 6 of 1." ADDJ:ND~ NO. 1" Attagb,Jllent No ... Paqa 6 of 15 .-Hi; ~HU~-, Jei ,1 06 1 :51AM; P d 9 e ;j 2 ! 40 SOUTBSIDB II'M'BR TRANSMISSION MAD PRASE S RODD FIELD RD. 'TO WBIDLBY DR. BASlI! B.ID 'B' DUCTILE Iaon PIPS 1 II III IV V am Q'I'Y " UNIT PRICS r!l'ZM J:XDN8Iaf D&SCRXP'1':Ic:.Ii BID I TJ:M UNIT 8-1 28,450 42" dia. Transmission Main, No 6f/) NO 13r!) LF comPlet~n place per LF ~ - 82 27 42" dia. 11. 25. Pipe Bend, ~ Z7 ~~ EA complete in place per EA /. ~ '--- - -- --.-+-, ~-,- -- /,l-3 10 42" dia. 22.5. Pip"" Bl:lllU, ~ '/00 <'2 i 3'iooo pt EA complet" iT! pl~ce per EA $ 1--- -- ~ --.---- -----.--. B-~ 21 42" d~a. 4:,0 Pipe Bend, 3, 'icv. <~ rill 9a? ~-..: EA complete .in place per EA $ ~- 8- 5 1 42" dia 9()~ Pipe Bend, i EA ...-- .:V S;-CW ~~ complete in place pel' EA .> c?a? - :;; ---~: -- --'--- --.'------- - -- B-6 1 42'" x 24 " f'ipe Tee, complete 7&<:vi.\. -; (,aJ ~ EA $ ~~_~c€per eA / ----- --- ---~. B-7 1 42"/1;16.' Jia. Pipe Tee, ~ lot? ~ EA b I 100, .'S.. complett: in place per EA $ f---..-_ --. --._- -- - -'--'--. -----. --- -- -- B-8 1 42' Pipe 'PL19, complete in :z: r;cv. ~ EA ;S &aI. ~~ pl<lce per EA $ - .---.- - B.9 1 42" dill.. aUtterf~y Val Vtl, 25;a::v c;Q. EA .2 :>:' C-QJ~ 0, S cOltlplete in pl&.ce per EA _. -....- "-1(' 1'65 "Install Only" 66" Dia. CaBing LF 'not.,1.d by Op<n Cut. 1 3;3CV l,.~ complete _ in place per Lf'_H_____ 2C'. .;: $ ,----.-- , B- 11 315 66" Die. Casing InstallAd by , Ll'" ~. ---- - -~ boring OL tunneling, complete ~t< .~ 21'{200, ~ in place pel LE' $ ^~--'-"-- - f----- ----.- 8-12 /12 Air Relea~e/Surge Relief EA , in /14 fCO. <2e.- I ~amb'c, campl.t. place per ~ 'ICXJ :;. ... .;> - -- --.- B 1 'f h . . B10~-:ff Val v.. complete lTl J: aJO. c~ 32 cA:??' qz. _ _ _ Lplace per EA $ L-..__ --..-..------ .~.--- ADDZNOtJH NO. "'_ At:taclmant NO.:. Page 7 of 1.5 1-- -. 8-15 5 tA - B-1 6 13 EA 3-17 8-1B E-19 k-20 -- 8-21 f.--... 8 22 B23 8'-24 2 EA --- B-25 90 LF 10---- -_ '-__ 8.26 20 Lf -.,,, - 8-27 20 LF 1 II BID 0'1'Y ~ ITEM UNIT S'14 "jt 1 U: . :52AM; FJage j;1! 40 IV UNI'l' PRICZ h I ~low-off vahe wJ,.th ~O Q EL, ~ 7OJ. ~ .. _~omplete in place pet' gA ---f------- SOUTIISIDB: MATER TRAHSMISSIOfi MAD1 PIlABE 5 RODD FIBLD RD. TO WBIDLZY DR.. 8ASB BID 'B' DUCTILE IRON PIPE 111 DESCRIPTION r Guard PO!lt r complete 1 n place per ~ .~. _ _ __._ Metal PO&t with Sign, complete in place per EA --4- 1 LS Cayo Del Oso Crossing, complete in place per LS 1 FJ\ 24" D1a. Gate Valve, ~omplete in place per EA -- ~ -.... --- , -. -_._-~.. 16" dia. Gate Va1v-e, complete in place peL El\___. 1 Ell '- 1 FJ\ 24" :j{ 12" Tee, complete in ._~ac_~..2~~.. '___~_ '___ 16"x12" ~educer, complete in __ ~ace per EA .. 1 EA 1 Ell 12" "'138, cDmplete EA in place per 2 Ell 12" Solid Sleeve, place per EA - --~---- .-'---~.. complete in 12" G~te Vdlvs, complete in place p~F~____ 24" dl& ~~ctilA Iron Pipe, Comp~_B..!~ in place per LF~___ 16" Dla. Ductile Iron Plpe, complete in "plii~E~_LF 12~ Dla. Ductile Iron Pipe, complete in pla~~_per LF ~evise~ Propo5al Form Page 6 of 15 ... .. _. 300. 'i- /<X1 f'~ .-----.----. Nd t3tO --" ~? I~/CO, - (1' G,OOO, .:! 2 000. .;;; > 31o~ L{~Q!1.. ;?,/aJ. ~~ ." 1/~9Z 175~ ~ l~ ~ /90 ~ v BID I'I'I:K EX'BN8ION $ /~ L/oo, ;l:Z $ i ~/"V7 (Xl :>vv, ..- $ ~ 3c:r;, e2 $ Nfl 15ID $ '7 /00 ~ /, . $ ~, oa7. CJZ $ <C 2.oa? .- $ .3"10, ~ $ if 3c;i ~ $ .. 'i 2cti, ~ ADDENDUM NO.1, At:.t.aahaent No. . Pag. 8 Dr 15 .. I BID ITEM 8-28 t-~ --- - B-29 1----- A-33 ~ - H-~34 1-- -- - P.-35 f-_. 8-36 !' 1tH_I,r::. .1 ;;1 [)c 1 :52AM; FJdge :34/40 SOUTBSIDl& ~ TRANSMISSION MAIN PRASB 5 ROOD rIBLD 1m. TO nr'l'BLBY DR. BASE BID IB' OUCTILJ: laoN PIPE II. UI 8-30 2,89Q SY ~-- ~--- '-'- _.- B 31 420 6" Conct8te Pavement, SF in place per SF ~- -- '- ----_. - ---' --.....:----~ ft, 32 Q"1'Y . m:lIT DJscaIP'l' ION 1,150 6" L.l.JlleStabil. Subg:cade, SY complete in place per _~_. _.-1----- - 3650 8~ Flexi~le Base, complete in Sy pbce p~r Sy ___ 1-1/2" HHAC Pavement, complete in plac~_per S~, ._~ complete 460 Concretl! Curb and GutteJ:, LF complett ~n place per LF ___ _. ~- --"--~-'-f-- h840 Concrete Sidewalk, complete in place per SF - _, ____, ___ _~_. -. ----.---1---. 13 EJ', Reconstruct Sanitary Sewer Lat.eral13, oomplete in plaoe per M ~ _____ ---~- _ .------t-'. Reconnept Sanitary Sewer Laterals, complete in place ___ .J:er E!'__ _- _ _ .._ 1~ EP. .31,000 LF Trench .Safety, complete in place p~ LY __ .._ __ B-37 19,850 Dewaterin'j, compJet~ tfl place LF' er LF ~ _ '_ _ '_ L_ __._ ___'- --- ~_. -----. B 38 ~~r900 Geotextile. complete lfj place '_ _.-Ee~E__~_-_ _____ B- 39 1::;,450 CrusheCl Stone, complete in Sy plac_e~. Sy ___. __ _ j - -;~ ~-;~A Remob1.1iz:t'1tion, campI et e in -' _ ..__~lace_~'p'erEA _. .__ __ _~_ (Revis!tdj Propol'lal Form Pag8 9 of 15 IV v UNIT Plu:a BID ITBH ~SION /~r.:-; $ IZ zs-a S ZO..:;!. $ ?~~.~ - 20. ,~ $ ~Z 900, CS- ? ~;. $ ~ 9i.fO ~ . 30 ~; :$ ---13- .fa? ~ 5'~ % zoo. ~ $ at 3- 2a?, - q~ (Pa?~ s /000. Pc;. .J!;,oo~ ~ :; .0- $ 01 $ ql .$ ..~-~ 01 $ .- " S:OOO, - $ 3/0, qf. -- Jqt',flL 309. €? /5'-1 'iE- :/eJ. 0(70, ~ ADDENDUM NO. 1._ AttachJHnt No.f Faqe ~ of 15 .. ':1' , ,1 L 1 :5~AM; Pag!? 3~,i40 SOOTBS:tDB WATJU\ TRANSKISS:IOH MAIR PRASE 5 ItODD FI&LD 1m. 1'0 WBJ:TB:LET DR.. BASE BID '8' DUC'l'ILB IRON PI:PE I II III IV V B~D QTY & UNIT R'lU~ DE8CRIPTION am ITEM EXftNSlOO ITIlM lJlfIT B-41 500 Disposal Qr Contaminated Soil, 2- 5cJO, .';:" CY s-.~ .$ complete in pIa Cl"=--Ee r Cy - ----- I-- ------ -- -- 842 1 Utility Allowance (Mandat;o~ LS A11o.~) , complete in place ______ ___ ....E~r LS 50,000 $50,000.00 '-- . --- Wat8r ~ranaai..1on Main Material TOTAL BASi: BID 'S' "Duotil. Iron Pipe" NO 6fb $ NOTE; Tha above unit prices must include &11 labor, matQrial~. bailinQ. removal, overhead, profit, Inl!lurance, etc., to Qovar the finitlheci work of the several kind$ called for and the OWner reservsB thQ right to'incre4~8 or de~redBe the quantity ot any bid item. The aboye quantities 4re approxl~tQ ~pd ~y vary from the final quantities. Do not o~der roaterial ba30d on those app~(J><l'l1lata lJ1!ant.iti~-! - ~evi~g~ Propo8al fotlfl Pug'" 10 of 15 IIDDau>tJH NO. 1, A-t t-.ahA.nt No. is, Page 10 of 15 'HirlU, ,I 21,Ob 1 :52AM; Page 3U/40 BID StJMtGRy BIDDER rna} bid cn any individual and/or combined Base Bid. If th~e i.s to be no btd on any part, write in "NO BID". Base bids listed in the following swnmary shall match those totaled on the following pages. If there is a discrepancy, the totaled bids on the following pages shall 'A"~;-~ Cyli~~or ...--.-1' govern over those listed below. BASK IUD steel Pipe $ ~ '17 (p,< {pi (p. ~ ._~ Circle pipe matexial to be provided: 6~lir~~ or "steel pipe" BASE BID 'B' Ductile Iron $ No 131l> ~evi.~ PROPO:lAL FOro.! fAGE 11 Qf' lS ADJ)~UM NO. 1 AttaabJDant NO..' PaAie 11 of 15 T _ rYii_ I t- ~ CALENDAR DAYS ~ a , ~ e s S r< ~ ':! ATTEST: 1:. m a t ~ APPR~D .~S TO LEGAL FORM: , ,. " I . (, \ i ~ 2f?VV\ .~. ( ~ ' I -..Fl'.,.. :.t-.. '.-'-,CO' ! . ....":,11 --1. .I,J~ 'j :." . .', .. -' I,. 1[,:/, I 1/(,,1C' ATTEST: ~ ~ ~ - a T L, lj ~ /In .' -.=--.--... Sec - 11 13e ~.J. ~ ~~-r'-- (Note. If Person signlng for corporation ~s not President, attach copy of authorlzat~on to sign I/,] :: ,-;...,.. t"', (10) calendar days from mD~ete same within 300 "- ~h ,lei Cortractor default, (:; ~l t- ~.- J r;!3(j S as set forth in the ~~ds :or performance of the ~c~men~s as the work .Lt- r 1 st., : ?xas on the date shown CITY OF CORPUS CHRISTI ., . l~~,l~1v ,~ ad? . E' ; 1: 1. i' 'de r k ;~ n-~ el ;..,/ t ~ 3/.111/16 rf. Ff~ co L'H, P. E . ,'" ~cr -~ EnJlneerlog SerVlces CONTRACTOR S.J. Louis Construction of Texas, Ltd. /f4, i/ L(I.Lt;#k- Le~ V. Whitman, General M~nager 9862 LORENE ST., #104 ress SAN ANTONIO, TX 78216 State) (Zip) * 210/340-9997 fa>: 'J ,::,.~ '-:~IP ~l~~-=-~~ 1,0lli<w. ~I\f ~U --l/-ujvJ -",..".,,,.... -- ..-........... ~ _._....... r 1(, . ..... '..-- SU:t~ &] ( 11- 3.0e :c~c :-::::..:: p, 03 ~002 -----::, 9~,( :: c, S 1 F~ ~ 3'!E?::: . Fn;SJ, In fheOffica of tt\e Sec:etarY.ct Stated ~ ~- C.(Jrpcrations ~., 1'1":1" CE.'!'IFIc.~:-:E:s :;:.~.:z;:. Gll I ';vi:h r~~ \C ~ ~t of The S, J. Lcuis. C:;n..~tiCtl. ofT~ L~ I-..~ p~~hip (:he ll~H). 1":." -...,so '0_--.-._"""1,, -.,.....,..:s' "'. J T "n~" C .~.,.. r to' " . . '13m.e. 1....... ....___..........~ ~ .-"- -., ~u..5 CT...."....:.cncn or ~ ~ - . 2. 'Partn~''3 Buain.c::s. Tne P~..hip's ~~s is ow-ning~ ci.evelapbg, lea.sing, mffi'lR~;"i7 and sc1li:ng r=~ -:..ct2......, ~ a. owe-: !'dated r~. TIle Pa..'"'tnel'=F ~y :ili:.odo all '~in~ ~ cth~.!~ ille~ 'Jr!:~ tt~ :~-S of::.: Stz:.e of T-::J.S. - ~ 3. Re-.ri~c-"..ri~ T~e =n:: ~;cst oi:fi~ aC.ci:res:i cfilit::pz:m=::ihipregi~~ age::.! is: :.~ Wbj M";m :401 Ayer..ue : Suite ZO: :::. O.lkx, 102384- -\rli:ngtor.:, T~ i&.'I06 ~. J. wms. LLC 1 I).eia.-;.~ .:-l!!'..i~ :':.:lCll::.!y Cun:.;:m:.:; i:; ti:.e sole Ge::.-=:J.l '?2:.~e:J". S~ r. L;;Juis., L:..C :-esiees arul has :t's O'.lS:r.ess ~~.-T-r~ ":II ~L:" '"':1 =--= S tare ofDel.:.v.~. The C~e!"".J P..OJ. ~~s ::r:;Z:s:! is TJf: Cocporc.ricn T:'Jst C.e:l~- ::.09 O!2.::~ Str~-, -W"':i,.,.,111!'.c::.. DE tS80L 4. ~r":;e.rlIJffic.::, ':"'he ::CSl:~ffi.c: :J~ci~ cfthe c:6c::: J.! Il,..:b.i6 its ~dS ~ :key!::..s: f 4 .... no i- ---....- __\..l_ '-'raI:.~ ~u.~ ';V;;.....-~:.:...u.. DE 1'780: .:: - r........-mers.... lU ::arr.~ 'l,"r'" ~~~ "X5~ o:5c~ :..::..--:. ..~ cr l~ Ce::.~..l Ea..."'.:1::: :s: s: Lu~ I.lC l2C5 ,~S= 'N:-~...,gt.cr:., Df:9gC: ::::.O'tl:!~~:;;=.= ~J"'I-" ,..'oc' ... r .t. ~'..... r-- " .,.,.... p, ~4 ., '" r'::ci:t \ 6. Dissolution. T~e ?a:r:::lC"Srn:p snail commence on ,x; ,.. . 1998, and shall have pc::: et'.::.al e:C.ste:lCe unless dissc ~ 'led. by act c f:he P a..r-:x::s, by ap era:::.on of 1zw 7 or as othe:"wise pI'CVlded in this Ag!'e~e:lt.. IN W G~"'ESS w1IE...~IJF, the 1.I:J.de'sismee. sole C~e:-al. P:::...rwe: has s12!1e:i and ~clerl - - tilli: Certi:fic:rte on the day a:nd ye:rr frs.. above wrirr.c. S. I. LOli1S CO~-STRUCTION OPP=.....x.:\S LTD. ,~ P .A_Q..D""ERSEIP " ~~/4 /}/J _~~ ~---f/~~ '5. !/LJuis, :lC:- G~e:al F-arme~ ' -- S-:-A1'E OF TEX.~ ss. COu"'NlY GF I {(Yll', L", f'J.rrr (.~ ,/ f /'1 Or:. till:; ~ d:ay of 0--'1.Il L. \.fav( , 19 '[ '& before me, ~ Nota.ry Public, ~~thin ;md. for said Cctmt'y, persoruillY app~m6 s..~'\'e---~ ..0 me k:aown. who, bemgduly 5'VOm, did say that S. J. Lcuis. LLC IS the C~ ?'JT'Jle" ofS. T. LOl;1SCONSTRlJ"CTION OF ~x.-'\.S j TI) a limite:::. .....;J:!'t:I:::.e'Smp 3e -ca.r:n.ershiD ~e:i in the :ore.-,.('\i!la ...,-.-".,.,..,eDt-a:od cbat - ~_ _.., ::' _".a. _ .. ~.....:;, ~4.l.~,~ .... ~d ins'rr,.1IDe:lt was si::",e:. as the free ac::>:::Q d~ on ~ and v..i.tb: the authority of said PartD.~..hiD. r /l " Ii,! ~ ' ' i / ' .' , ~)~~ ~ f) . ,'-"- ~o~/?ub1ic U [~'t;.r~~~l , .,.. :=2413~r~C6C88..~ _, -l. . . -~- ;:.. -- 9 C TUE l' ~i" :> ~~:t ~!a1"2 of ij1tta~ ~ tn"rla~ of ~ 1a!-r . ,- ,.. .: " j . 1., l...,S c ';'(:1',-, .:->'= S 1" .... _',10 ;;; .. A .. - -.. :. "t u K ~:. .:; :: Ci, _~. .~ : ~, S ~ '; ,- - .,. ,~ . - \.JI'i J.,j -= -. ooe , "'," ';0:;;)1. : n i. r ......-v_~_ ~"4 S"7:: J ~'"" T l ::' ~ ~ 1" ':'": X .1. .5 - I U . ~'J:~2::'= iJ(J!.1.2'''-;1~-lO .:i~8 ,;.;.. ':2iJ2: ~ 2523 P ''-' ,J,: ~ ::J':''::: ~ 'J," :-"_=.1. .:.JX' u;..? p:{;j '/:; "...jc ? '_AC '= C'N RE CQRD '1'.aUR = l_.~:T~D J~~7~E:S~:~. =:'::;.- ;~:.. _??~.~~,:~T~ =v::~~4C: )~ ~L ~ ~ :.: ':;;::.: -. F T L~:< ! S ~-'T !-t':~cD ::.r-'~ r~ "Tr-IS ,jr=FIC::. ....::JuR FIU:S AND Tr:E 'r j ~-i7 G C "..J r - = i~<~G~L~JG~~ 6Y T~:S LET7~R. LET us KN'Gio!. ., -- ~.- '\ '... -0 f: ....., :.:d: C::: .. """ ~ l"~ "7" 1 ~f:. ~ /< ,;, - --- -::---:-- ,,<",-"'~~~ . .r-' ~~~ ~ '(:"~~\'~"_ ..,?i.' ,. --;... .... / ...:......-::.-:.:....:. '.-'::::- ..... .._-~, -' ... ' :;<> .' , . - ~. .. . - -::::.~" ~ ~~~A5~ , Il~~ l . AICc~~ ~. ~cnza!es, Ser:~~tary of SLa":C :': 1\1 CJ (' , ,J- 21 Ob 1: 50AM; Paqe 2[:,/40 PRO P 0 S A L FOR M FOR SOUTasrDE WATBR TRANSHl:SSION NAIN PHASE 5 RODb FIELD JU). TO WHI-rELEY DR. DEPARTMENT or ENGINEERING SERVICES CITY OF CORPuS CHRISTI, TEXAS ~evis.<i PROPOSAL FORM PAGE 1 OF 15 ADDENOGif NO. 1 Attaomumt No.' Pap 1 of lS UG 1 :50AM; P,lqe 27 40 PROPOSAL Proposal of Place: c.~1I< S CH$U $11 / TGY'!\s Date: JAi-J~\A(b'1 z.r; ( Z.Oo~ {)At? ~1 \ I 2-00 c.. [)4v s.T LOlAl~ Wi-JST/l-LAcno/-J CF Te:X~, t..:rD, a Corp~ion organized and existing under the la\fs of the Stat.e of Nt\- OR a (fart~~ or Ind~al doing business as J,Afl-T!::ff(LS~tP - LES \^IHlft-"AI-J AJf) TAKES Sd-Pl..lG~ TO: The Ci.ty o~ Co~a Chri.sti, Texa. Gentlemen: The undersigned hereby propose.9 to furnish all labor and materials, tools, and necessary equipment, and to perform the work J:equired for: SOO'rBSIDB JOlTER TlU\NaDaSSION MAIN PHASE 5 RODD Jn1U.D lID. TO WJUTBLBY DR. at the locations set out by the plans and specifications and in strict accordance with the contract documents tor the following prices, to-wit~ ~evi 8.4 PROPO~L ,-ORH PAGE 2 Ot' 15 ADDJ:NDlJH NO. L Atuc:shaene No .'i, Pag. 2 of 15 !It:, 1: 51AM; F\lge ,'e!40 SOOT'-SID& WATZR TRANSMISSl:C>>I NIU:R PBASE 5 ROOD 1'l:1!:LD RD. TO n:tlfE...KY DR. BASE IUD 'A' BAR lmAPPBD CONCRETE STBEL Cn.DIDU PIn OR STEEL pxe 1 II III IV V SII> an " UNIt' .Pil:Ia: DESCRIPTION BID :In:K EXDlHBION r'l'i:M UNIT A~l .28,450 42" dia. Transmis5ion Main, /32. '.lo: ~ 7-S-:;: Lfa? ~;: LF complete in place per LF $ _. .....-- _..~-- ~- , - ~._- -_.~-~-_..~-'" A-2 6i 42" dia. 0.10 to 5.00 Pipe Eli Beve 1, cC)mpleta in place per 32.. ~~ 2/ It/'/. ::t- EA $ -- - --.----- .-.---.--- - 1\ 3 4 4:2" dla. 5.10 to 11. 250 Pipe ~ 9tXJ. -l2- /; (, tZ? :';.. EA Bend, coctplete in place per EA $ - ._~-~-- _. - .-- f---- --. -.-- --1---. _________...___._ A-4 10 42" di a .11 . 26 Q to 22.50 Pipe /9. 000. EA Bend, c~plete in place EA ~ 9~ ('Z $ ".E. per - 1---- . ..-- ~_.~._.- -~ .~ ~~-...- _...~.....,.,..... A-S 21 42" dia. .22.6" to 45" Plpe ~ (p ~ 1100. EA 3:~ ."lL- Bend, >..::o.plete in place per EA $ ---....-.- ..~- ---------. _..------..-. .-- ._~_.- A"6 1 42" dia. .45.1" to 67.5. P1pe EA ~ CjCO. ~ ~ 900. "s. Bend, cOnlplete in place per EA $ -.-..- ..- _._-......-~~~-----_.._- -_..._~- .-.--. .. A. 7 1 42" 0.18.6),6" to 90. Pipe EA 5( '" S-O~ .'l: Bend, cnuiplete in place per EA - -- ,OW.- :;: --'- t-- ~""-"-"-"-- ..--p---- ._~._------~-_.~..._- -_.._~ 1\-8 1 4?" x ;>4" Pipe Telf", complete /, EA I, t{}J. ~;. f(J(), # in place per U - $ -...-- ---~._-_._--- -~_.-._.- ---. A-9 1 42"x16" Pipe Tee, complete in EA t lev, ~ I, ~ place per EA $ /o.? '-- ._- 1--- .- -_....~_._-. -.----. - .._.,,_._------~-- .- -- t---= -- A-1O 1 42" l?ipePlug, complete in Lf2a:J,~ ~2CYJ. € EA S place per LS -..-...-- ----.-.--. -- --------.. ..'----.-....----_. --- --- ~.. A-ll 1 42" euttarfly Valve. complete EA ,2Jav. <,J;- ~ 00;}. .~ in pldce pe,{ EA -$ --------.. .--- _____________n .-+--- _.~--------- -- . -- ~evi:s.~ Proposal ronn Page 3 of IS ADDENDUM NO. ~. Att.acbaent No '.' p&g_ 3 of is' ,Iut 1 :51AM; Pclge 29/40 SOOTll$IDB WATER TRUfSMl:SSION HADI PHASE 5 ROOD FIELD RD. TO WBI~Y DR. BASE BID 'A' BAa WRAPPED CONClWTE STUL Cl'LnmBR PIn OR STEEL PIPE I II Bll) 0'1'Y" ITEM UNIT A.- 12 165 LF -----. -- -- f\ 13 315 LF A 1 4 12 U. III D&SCRIP'l'ION "Install.only" 6b~ Didl. Casing Inatalled by Open Cut, complet~ln place per EA 66" Dia. ~as1nq Installed by boring ot tunneling, compl@te in place per LF -~- ---. Air Release/Surge Relief Chamber, complete in place per EA --- -- ~ ----- -~ -- ----. --~ A-1S k Blo~-offValve, complete in _____ _~~~.::_~..E~EA ___ A-16 2 Ell ~ ~-- ---- A. 17 5 Ell. f-- A-IS 13 EA - --1------ ^-1 9 1 LS A-?O 1 F.J\ 1--- -. A-21 1 EA -- ---.- A-22 1 EA Blow-off Valve with 90" Ell, complete in place per F~ - - -- - - Guard PO$t, complete pe:-_ EA__ __ in place Metal Post with Sign, complete in place2er EA _ _ _ _ __ _~_ IV v UN7T PRXCIl: BID t'l'Dl J:X'l'BNS:ION 20~ $ 3.3a:? ~ -- - ----- ~0.; $ ZO~7S0. ~ , t '1aJ ~~ $ 1/4W. e. Koa? ~ $ 3Z,oa? !22.. .. g"700.~ $ J Z 'fClO, ~ ;W. ~ L S- 0rJ. U- S IOQ-;" $ t3Q? yJ.. Cayo Del Oso Crossing, "2.. f10 () ~ complete in place per LS ~.;; W. --- ------~ 24~ Dia Gate V~lve, complete _ _~n .E~a~_e ~ per EA._ 16~ dia. Gate Valve, complete in plac8J:<'t0~_~ _~ 24~ x 12- Tee, coroplAte in place pet I'~__ __ .__--_ lEtev1se~ Proposal Fo:r:m Page 4 of 15 2. ~ $_~(7o. 000, /~~ ~~ I ~ t.a;) fl': $ ~7m~ :i 7c.t7 ~ ~ . s f-- 2. az;>. .rs. ri . ZO%J. ~ $ ADDDIDUM NO. L Att:.a~t No.1 ~ .. o~ 15 ot 1: 51 AM; P,Jge ;J(j;40 SOOTRSIDE NATU ~SlaSSIOH lGUR Ji'HASE 5 ROOD FIELD RD. TO WHITELEY DR.. BASE BID 'A' BAR WRAPPED CONCl\B'rB S'1'BEL CYLINDD PIn OR STEBL p.tn :;:90 ~I-,::'::::::::' ::::~::: :::::~:: j_ln place pel SF t~o -1.... ~.;;~ :~.. _= ). ~1 ~ l:~~ ~~; t ~~' ~F84f) Concrtete ~id@walk, complete in __ plac~_E:~1:' ~ . 1 II BID QTY" ITJ:N UNI:T 1\-23 1 EA A 24 1 Ell A-25 2 EA A 26 2 EA A~.27 90 LF "-"-~--.-'-- 1\-28 7.0 LF A-29 20 LF ----.--.-.----- A-30 ~t150 A-]l 3650 Sy A--32 A 'Ll A--14 A-3S III IV DIUIC1unION UMJ:'I' PRI:C& 16"x12" ~educer, complete in place pet EA 3/0 "S 12" Tee, complete in place per EA '/;;0 ~~ 12" Solid sleeve, complete in Plac~ pez: EA 2.1$. PL l2R Gate Valve, complete in place pe~~ ~ 3cXJ ~ 24 n dia. buctile I.rOIl Pipe, complete In place per LF --.'-- I ___ _...____._.___~ 17~ ";' 16" Dia. Ductile Iron Pipe, complete.l:.n pla~per LF 70. '... 12" Dia. Ductile Iron Pipe, compl~te ,In place per LF 6" Lime Stab1l. SUbgrade, complete in place pOI' SY /90. ex /.?:' ''3- :/. I '-____, ___ ___ .____...___------.....-__ B" Flex.ibie aas~, '~ompl et tl in place perSi 20C~ 2ZJ, !\:. -7 "t' .;..- ---'-'~'---~ z,... <v ~"~ ---~-- r"-' :/. .- "_u._._ ~V1"e~ Proposl!Il form Page 5 of 15 v BID 1rBM: BXTKNS.ION $ 3/0. ~ .$ Lj3o, e $ If ~. ~\: $ 2 /. A-'l .x ;" lPvu. $ /5; 75"0. ~ $ l L/ CXJ. q$. $ ~ cfCCZ -~ $ 177 --0 ~ /?-!:> . $ 73 aJo ~ ~ . $ ~7 ~ ?...?~- $ z CJC;~ ~ $ I ~ fa:? ~1<- $ Cj'2a::J. <e AJ:lO&NDUM NO. +._ Att:acha.nt:. No.f: Pap 5 of 15 ~1~' ld C' c: 1 J c' , 1 (J 6 1: 51 AM; Page 31/40 1 II HI IV V SID QTY " UNIT PRICE. I'1!EH ONI'!' DKSCRIP'1'ION Bro tftM &X'tENSION 1'\-36 13 Reconstruct. Sanitary Sewer I Ell. Laterals, complete in place 3ZGV ~:- s.-!f /, &ct1. ~ per EA ' . ,-.---~ .-.-- I----~ -- "-----..~- -.. - A,-37 15 Reconnect Sanitary Sewer EA Laterals, complete in place I ()(>> .?3- $ I:;~ e. per EA J ' _..._~-~ -. ~. -_.._---"-~ A. 38 31,000 Trendl Safety, comp)@t~ in 0- .3 /0. ~ LF place per LF . $ ~- - - }I.- 39 19,850 Dewateri'ng, complete in place /q~ ~o LF .~ $ .;.~ I-- -.. .- pe~____~___- A-40 30,900 Geot.extile, complete in place .<2J- 3cq~ sy $ per SY I-- .- ------------._~ Po. 41 15,450 Crushed. Stone, complete in ,~ ! {;'1 ~ BY pl~ce p~r Sy $ I--~'-' - .- --~-----~- -_."- A 42 2 Rernobtl;lzation, ,;ompl ete in / a, 000, ~ EA place p~r E1\ ;;;C1CtJ, <N $ 1--- -- I--- -. I--"----~.~._-- -~-~--.~. 1\-43 500 D.isposa;l of contamj.na~ed SoD, 5. 2 5"cV ~:::.. Cy '--~ $ ~:omple.~.~~er Cy -" . >.---- -- 1'\-44 1 Utility Allowance 1l4andator;f IJr~ Al.101frioe) . complete in place an "'1'111\ per LS 50,000 ,--.<- Tnconeret:At l'i " W.t.:t' '1'ransai..i.on ~n Material. (Circle one) : 1. " SOUTHSJ.DB WATER 'l'MNSH1SSIOH MlUN PHASE 5 ROOD !'IKLO RD. TO WBITBLBY DR. BASK BID 'A' BAR WRAPPED eaccnn S'fdL CYLINDD PIPB OR STDL PIPE Cy or 11 steel Pipe II TOTAL BASE BID · A' $ g; ,/7&" I)'IG. .r;;.. NOTE; The abuve unit prtces must )Delude all labor. material~, bailing, remo'lal, overhead, prof Lt. In::lllrance, etc., to ~over the flni~hed work of the several kinds called for and the Dwner reserves, the right to lncI:ease or decrease tbe quantity of any bid item. The above quantities &re appro~~ate and may vary from the final quantitle5. Do not orde~ ~\al based onthe$e appro7>lmate quantiti~. ~ ~~ ~evj..S~ Proposal Form l?age 6 of 15 ADt)DU)~ NO. ], At.tagbaent NO..:.: pap 6 of 15 St II iMU,; ,h1r' 21.06 1: 51 AM; Page 32/40 SOt.JT8SXDB 1rA.fta\ TMNSNISSIOR HADf PRASE 5 RODO FIELD 1m. TO WBInLBY DR. BASJ: aID 'B' DUCTILE IRON PIn I II III IV v sm (r.l'Y 4i UNI1' PJiUCB BID rTJ:M &xDN8ICti I>J:SCJl.rP1'rON ITJ:K UNIT 8-1 28,450 42" dia. Transmission Main, NtJ ~//) NO '0d) Lf- cOJl\Dlet~in place per LF ~ - .. ~ "-~- ... B-2 27 I 42" dia. 11 . 254 Pipe Bend, /. ~ Z7. ~ EA 1 complete in place per EA ~ >--. .- -l-. .- ~._.._- .- 8-3 10 42" dia. 22.50 Pipe B",nd, ~ <I (j() ':E 3t(ooa ~ EA complete in pl~ce per EA $ .. I-- .. -- _. -- --_.. .---<--. ---_._._.._.~...~ ~---_._,. B-4 21 42" dia. 450 Pipe Bend, 3. fa:;, '!: fl, 1cv. ~ EA comolet!;! in place ~~ $ 1--- I 8-5 1 42" dia. 9D" Pipe Bend, ~ .a.:-~ S;cw ~ EA .~~- :;; complete in place per EA .. _. -- ~.~-_.~- .- --. B-6 1 42" x 24" Pipe Tee, complete 7&a?~ 2(,~ ..<::e EA S 1 n...e~_a~.e ,pBr BA _.. / -- '----- --...-.- B-] 1 4 '''1\;16'' dia. Pip@ Tee, ~ fO{J. ~ EA . I ::t' '" complete ,in place per EA b, aJ,'- 'i' -..... . _.- '..-.-'.----.- - -.,.---- B-8 1 42' Pipe ;Plug, complete in ~ 2~~~~ EA place per EA ;; &a?, ~ - _.---.-_-- 13-9 1 42~ dia. ~utterfly Valve, .2;:C a:v, ""- ZS;CQ? ~ EA. S complete 1!:1.. place per EA -~- B-I0 165 "Install Pnly" 66" Di~L Casing LF rn5ta1l8d by Open Cut, ;3 co. .~ 2"- tJ2 $ complete in plac~.Ear Lf'__ ... - Jj-.L 1 315 66" Dia. Caging Installed by 1.1" borinq Qr:- tunnelin.g, complete ~ ~. 21t.{ 2 00, !l:. in place per LF ~.- $ I--_n__ -- - ~.__..---. -- ----~- ~...r_~._ B-L2 12 Air Release/Surge Relief EA Chamber I complete in place ~ LfOJ :;. /12, fa:>, <.2!L. 3k_ per $ EA '-~- .. --~. ------.- .~- . ._ ..___n_..... __ ---_.~ B BlOw-off Val ve, complete in g ct?O (~ 32oot::' ce place per EP. $ '----~ I -_._-----_. ~'---~ lRa\'i$ecl Proposal Form Page 7 of 15 ADDENOON NO. ~....... Aetachaant NO. ::. Fag. 7 of 15: (ll 1:52AM; Pdge :3Cl/40 SOUTIISIDJ: MATER TRAHSMISSIOM' MAD PRASE 5 ROOD FlBW aD. ro 1IBIDLl:Y DR. BASK BID 'B' DUCTILE IRON PIn III :IV V I II. BJ:D Q'l'Y " DJ:SCRIP'UON UNIT PRICE BID ITEM ZX'1'P81:ON ITEM UNJ:T B-14 h i B1ow~"off valve wlth 90' EL, ~ 7a? ~ l~ '/00, ~ Ii! _----+-.iomplete J.n place per EA -- -- B.IS 5 ! complete in place / 5""0C7, ~ itA Guard POlllt, 300. '?i- $ per EA ---~. ~-- ----- .- -+- B-16 13 M@tal Popt with Sign, complete /00 n. $ t3CV, e: EA in place per EA - f--- ~-- ---- -~ - -.------t- -- ----- B-17 1 Cava Del Oso Crossing, Nd 13/0 Nfl 1~/l> LS complete in place per LS .$ - f-- - - -----.,. --- -..- -- I-- B-IB 1 241" Dip, Gate Valve, t::omplete "',. $ J7. /00, q,2 EA in place-per EA I~ ICO, - -- _h ~- - -- ~----- . 8-19 1 16" dia. Gate Va 1 ve, complete (.,,00(7- "-E $ ~, oa7. ~ EA in p18C'=-P~ EA__ I-- - -- --, ---.- 8-20 1 2-4" x 12" Tee, complet.e in 2 000, co.; 2. OQ/, '.'L EA $ .place pet' EA .------ - ~. ~ _. ----.--- -. ~~ --- --- _..- 1:-,21 1 l6"x12" ~educer , complete in 3/0 ~ $ 3/0.. ~ EA place p~r EA - - - - 8-22 1 12" Tee, complete in !Jlace per t/ 3t:) c& $ Lf~~ EA EA '------ .-.. "1------___"__.-..___ -..- - B. 23 2 12. Solid Sleeve, complete in :2 let? ~~ $ if 2ctJ, ~ Ell. pI a.c~~EeL~..___ .. --- -- --- - 8.24 2 12" Gate Valve, r:umplet", in /3oCJ~ $ ~(Pm~ EA place p~ E?\~_ r.~ ~ / - - ...-- - ----.- 8-25 90 24. dl/l Ductil!?! :ron Pipe, 175. e $ /5; 750- ~ LF comp~.e.!e .in pla_~ per Lf' - . ----'- ~- ~ 8-26 2D 16" Dla_ Ductile ] ron Pipe, 7 X' $ I. '100: L~ LF complete in place pe!"~_ LF ~- -.,--- B-27 20 12"' DJ.a. Ductile lron Pipe, /qO~ $ ~ l?Q? ~ LF complete in place per LF -.--- .-. '---- ~evise.:IJ Pcopo5Cil Form Page 6 of 15 1d>DENOUM NO. 1 Att.aahaent No.j Pac;. 8 o~ 15 -0 f~ "~ ~ 1 j tJ U;, ; clcit ;>1-06 1:52AM; Page 34/40 SOU'l'IISIDlC 1GDR ~SMISS:ICDI MAIN PBASB 5 ROOD J'IBLD n>. TO lfRX'l'BLBY DR. BASE BID IB' DUCTILE IPDU PIPE II III IV V 1 BID Q"1'Y AO ~scalP'1'ION UNI'.t PRJ:CK BID IDH. SJt'D.NSION ITnI UNIT B-28 1,150 6" Lime Stabil. SubgLade, /5"- ':s 17- 2:>0- ~ S'f $ comple~in place per Sy t-. B29 3650 8" Flexible Base, complete in 20. -~ $ 7~~.~ Sy place p~ S'i - -.---- ~-- --.----- 13-)0 2,89() 1-1/2" uw.C Pavement, complete 2(J'~ ~2 f/{J(}, qg.... Sy $ in placlil per 8Y -. -. I --.----..- _U". B-31 420 6" Conc*8te Pavement, complete 7<$- $ ~ cjLIO, ~ SF in place per SF . , --- -- _____~,. 'M.~_'____________ -- B 32 <460 Concretlt Curb and Gutter, (,.';. ~ --1.3- g~ ~ LF complet' in place per LF 30 - - ---- ----------- 11.-33 hB40 Concrete Sidewalk, compLete in 5..~ $ ~zoo. ~ place per SF _._--~ --- ___.. --0--- -~ --... ----.-- -- B-34 13 Reconstruct Sanitary Sewer EA Lat.eralf;!. oomplete in place ~ 2(J(), ~ Lj~ tP~ .~ $ per EA -.--.- ~ -.--- ---.-"..---- :8-35 15 Reconne~t Sanitary Sewer EA Lateral's, complete in place /,000. .- J~ 000. ~ $ per EA f---- -- -- ------ --...-"- B-36 3LOOO Trench ,Safety, complete in 0- $ 3/0, <?~ LF . place per LF ------- 1--- -_._,~ ~,. --~_. -~--- B-31 19.B50 DewateL'ing, complet~ in place 0\ /9t. f't' s --- LF per LF ---------_.~ --- -,--~ ---.'''''.--- -. .-.-- 8-36 30,900 Geote;K~ila, complet\:l In place .~ ~ 309. €. Sy --- per SY --- -- ~- -"---~ ...-~-~~ B-3~ 15,450 Crushed stone, complete in .0- $ /5'1 ~ Sy ..E.lac~;r .E-_- _ - -- --...- . .- -'-"'- 13-40 2 Remobl1iz:ation, complete in 5000, $ :/cJ oX', ~ F-A. - -. - place F>..!T__ EA_ _~_ -~- ~vbe~ Proposal form Page 9 of 15 ADDENDUM NO. 1_ AttaehJlLent No 0' l"&qe ~ of" 15" ~. .~HO>., ),- ,1 00 1 :52AM; Page 35/40 S0UTH5XDB 1fATB1\ TRAMSMXSS:ION NAIR PRASE 5 ~ FIELD RD. TO WBXTBLEY DR. BASE BXD 'B' OUC1'ILJ: IRON Pl:PE I II III IV V BXD Qfi & UNIT l'RI~ DR 8CRIP'l' ION BID X'RM EXTINSIotf ITEM tnnT B-41 500 Disposal ot contarninLlted Soil, 2, S-ClO, .It;.. Cy ~~ $ complete in place per Cy -..---- - .-0_.- --" 0-42 1 Otility~lowance (Mandatory LS A11o.~) , complete in place ,--. ._- per LS 50,000 '50,000.00 ,---. . , - ---- .- ---~ "---~._-- TO'lAL BASI> 8ID "Duatil. IrOD Pipe" NO Bib $ ..tar ~ranami...ioD Maj,n Nat8J:i.l '8' NOTE: T~e abovti unit prices'must include 011 labor, matQri~l~. bailln~, removal, overhead, profit, 1n"urance, etc.. to dovli!fr the finitlhed work of the seversl kind& called for and the owner reservea the ri9ht to'incJ::ell.:!lft or decrease the quantity of any bid it.eIn. The above qu.U1tlt1es 4re approxl~t9 ~pd ~y vary from the final quantit.les. Do not o~der material based on th9~e app;T:Q~lZll.ate quanti .!ie~ ~ViS9~ Propo.'ilsl E'Q:t1l\ Page 10 of 15 ADDmu>tJH NO. ~.. Att:aaluD..nt No .,~: Page 10 o~ lS },!? i Y 't-;')L l ,d: ,1 06 1: 52AM; F'8ge 36/40 BID StlMMARy BIDDER may bid OIl any individual and/or combined Base Bid. If theZ'e is to be no bi..d on any part, write in "NO BID". Base bids listed in the following summary shall match those totaled on the following pages. If there is a discrepancy, the totaled bids on the following pages shall govern over those listed below. BAA BrD 'A'F1" "rl.iDda90r S_1 Pi.pe $ ~ t./7C/,cJ'/C,. "'- Circle pipe material to be provided: ~oncrete Cyli.. nde?\ or "steel pipe" '-------:::::r- ~ BAS& BID 'B' Duct~l. Zron $ No f3lt> feVb~ PROPO~AL FOlUd ptlGE 11 or 1" AODZNOUM NO. 1 AttaabJD.ent No .... . Pa/i8 11 of 15 . ~') tJ ~~'~ ~HLI~'; ,1 06 1 :52AM; Page :37 40 ~he undersigned hereby declares that he has visited the site and has '_ dreful. y examined the plans, specifications and contract documents 'elating to the work covered by his bid or bids, ~hat he agrees to do the wurk, and that no ~epresentations made by the City are in any sense a warranty but are mere estimates for the guidance of the Contractor. Up(m Dotl! ieat ion at award of contract, we will within ten (10) calendar- days execute the fOrmal contt'act and will deliver a Performance Bond (as required for the faithful performance of thiB contract and a Payment Bond (as required) to insure payment for all labor and materials. The bid bond attached to this proposaL in the amount of 5% of the highest amount bid, is to become the ploperty of the City of Corpus Christi in the event the contract and bonds are not executed within the time above set forth 85 Uquidatelti damages for the delay and additional work caused thereby, ~ority~ftority Susin.ss &n~r1.. Partic~p.t1oD: The apparent low bidder shall, within five days of receipt of bids, submit to the City Engineer, in writing, the names and addresses of MBE firms participating in ~he contract and a description of the work to be performed and its dollar value for bid evaluation purpose. ~r o~ Signed Seta o~ Docu.ent.: The contract and all bonds wil.l be prepared in not less than four (4) counterpart (original signed) :'jets. T~ of QQmpletion: The undersigned agrees to complete the ~ork in JOO Ca~eDdar o.~. The ploject has been divided into phases. The Contractor is required to complete each phase before proceeding to any othe~ phase. At anyone time, except as noted above, theCoD~aator will not be al.lowed to .taJ:t. or work. concurrently in aore than 't~ phase.. Time duration for construction is allocated for each phase, and if the work in that phase is not complete as shown below, liqutdated damages will be assessed for each day the work is delayed. Pha.. I Ph.._ :u: - Pba._ III- Ph... :rv - Statipn O+Og to Station lOti+80 Stat.itm 106+BO to Sta'tiOD 212+63 sta~9n 212+63 to Sta.tLon 2gS+73 Contract Cl.oaure 155 Cal..nc:lax' Day. 7S Calenda:r: Daya 60 c.1.endar Days 10 Ca1endazo nay. The following tasks shall not be affected by the phasing; clearing of TCE and VEt surveying the water line alignment, TeE's and UE, pre-exploratory excavation, offloading pipe and storage within the designated TCEts and DE, installation of casing pipe by boring hydrostatic testing and di sinfect,ion. The undersigned fUrther declares that he will provide all necessary tools and apparatus, do all the work and furnish all materials and do everything required to carry out the above mentioned work covered by this proposal, in strict accordance with the contract documents and the requirements pertalning thereto, for the sum or sums above set forth. lRov$.lIedJI PROPOSAL f'ORM Pll.GE 12 OF 15 ADD&NDUK NO. 1 Attaehla8nt: No. .. PaQ$ 12 of 15 ~f:' ,j \! ~ i' 1!' C ~ ; ,Je'" 21 06 1 :53AM; Page 38'40 Receipt ot the following addenda is acknowledged (addenda numbe r!: ~~OlA t1. fJQ i ( II ']...6/0" )} ADVb'NOIAI1 tJD. 1.- ( 1/v-t (cJ., ) ) Al1aJ11~M NO.1 ( 1/2.1 /Dh J) AOO[;NPl/\ M l-JCPt ( If '11 (Db) I , Respectfully submitted: sr;AL '1 Bidder i~ d Corporation) Name: ~r\ l,-Q\)(f ~~~aJ~ a: 1&)0\5, L..-TD, By: ~/'.{A, y~ ..- (8XGea'1'UllllJ DIWID A. OI~SuJ Address: . 4~l.. ["C:t.ENG: sr. 11tIO~ (P.O. Bo,,' (Strf!tttl ~~AJTC+lIO I T~~A) lBUlp (City) (State) (Zip) Telephone: (Z-{o) 34D - '1';"18 (oFfiCE) (~o) 34-C-1'fn (Fi6-X) NO'l"IO' Dc nut detach bid trOlll other p~pers. Fill in with ink 4~d ~ubmit complete with attaohed papet$ (Revised August lOOOI lR:evisl!ItC PIlOPOSAL PORM PAGll 13 OF 15 ~DKNDUM NO. J, At.taahaent No.' pag. 13 of. 1S ~_B~ F ) p~_ M A_JL_C~_____ JLQ.1LQ BOND NO. 190-015-846 STATE OF TEXAS 5 KNOW ALL BY THESE PRESENTS: COUNTY OF NUECES ,:; ~l:--"a THAT S.J.Lou~s Constructlon T' _y of Texas, Ltd. : BEXAR County, Texas, ar-JJ_ LIBERTY MUTUAL FIRE tNSURAliCE COMPANY, a ~.?\"C r~ St2, E of MASSACHUSETTS s co co - _ ~ .~ 0 f T e x as, her e i n aft e r "' ~ en Lhe Ci ty of Corpus c--.~(C..c - ::y, Texas, herei.nafter ~ EIGHT MILLION, FOUR HUNDRED SEVENTY- ($~476,046.00)JOLLARS, lawful money E - Texas, far the payment t'E!,,,,: ,--~ c>urselves, Ot:r heirs, :CES .. and severally, fi.rmly ,=::: 2. a j;~l ec S t .~ , t i' F. .- y .L ~~ : r -30 ~ ~ I=- '::::- ,'-1 ~~X THOUSAND, FORTY-SIX AND :J (" c .. '. . - [. n ~.l '. ::> Jt 3 Ii .- ''"I E:S ~. ~_ t:'. THE ~ =-- ~OC .3t ::hec NOW :c 1 d -' r. E 'v rna.-; s e- i :) a + i CONDITION OF THIS OBLIGATION IS SUCH THAT: Whereas, the ~l~"_ ~--J='" \\:__.~~l the Ci"":jl of Corpus FEBRUARY 20~ ,::opy of which is hereto . ref , = ,j s t r , :: t i on 0 f : r . i__ - . 2 _ 28TH ,] '1 j'~ l_:l r-: SOUTHSIDE WATER TRANSMISSION MAIN PHASE 5 RODD FIELD RD. TO WHITELEY DR. PROJECT NO. 8391 iTOTAL BASE BID "A": $8,476,046.00) THEREFORE, f +~c: . i pc J s pee _:_ ::.; 11 ~ai~ fully perform said work nei contract documents, and if the principal aulty materials and/or jear from the date of ~he City, then this full force and effect. ,~ + -1(: v.,' '-', c .. ~ G._ .i .:.... ~", ,- ,. + .;; l~, ( ; (?;. ::. I -jefF'." ;:. y;::; ,- t i ~ v"e c; v .3. -;._, r ~ L . ~ ~ L 1 .- ;:::... L.:er e, 2 c n~' ~" 'e _ 0' ..' r:' \ .s .:::' :::-. ~:h PROVIDED FURTHER ~:_; Ay"'; - c: j '.', ~,e filed on this bond, ~ Ec t e'- .~~ ~c'Eby stipulates that no ~l::_ ~ to the terms of the ere y:-,der, or the plans, - j~ the same shall in anywise - es nereby waive notice of ~3~1 addition to the terms ue ...f~c ~ y ::J e ,. > .:~ r - a t l'rne -t l U ,-, e - J l' ,,\' 1 ~ ..::.:. Y'- 'v~J r,' c: ::J '- f ,'I r;~ L :3 > ,t '-,el, .-If -:-:-.1 I- =-,_~ " ~Ti E:: ! '-;:. .,.... +- ~ r Fl e-:J ~;ereuncier . tF '_ ._ ;;1(-'::;. '-- 'H:: r "~rt.s r-F ;:~rt~:::~e 516 , 'Or:: ~ .:::atle statutes of the T-:t: ].c '....I~ V'~ -=~C: ~ ~he Surety herei~ as .equislte notlces may be ~ad 1n matters arising . -:. 9- =-, '-jernon I s Texas cg'ccr eVE II-. r- Cc t}~ :...- ) ..- a r IN WITNESS WHEREOF, I v.. p~rri'::' c. 7th ~ copies, each day of "" .:::::. ~~, e-:1 >'lCLTCh Ot PRINCIPAL S.J. Louis Construction of Texas. Ltd. ,1; ll{lj.tua~ v. .Les v. Whi~~an. General Manager ~TJ~: t;arlO & .I-lel ATT::T.,~~: ~ . P (" t p r, J. S t a h 1 !~ 1 "'1 +- >.J ,:::;TI/:- SURETY UBERTY MUTUAL FIRE INSURANCE COMPANY -:i- " .~ ~'_ i L: . ,.+ -----..- 7"" 'Ii:- J.~J A~ -'" "~r"'c {"C'. Laurent R. Laventure ~- rr, (:_ The Resident Agent of the Surety in Nueces County, Texas, for delivery of notice and service of process is: Agency Contact Person Keetcl & Ass,)ciates Ke\'in Keetch Address _-.l71h Santa Fe,'~orpus Christi, TX '8404 Phone Number =, 61-883- 380 3 h'" ['a t pd "). . r-ac-:= 2:"TT\C:L,_ ;'-<, :.:: LIMITED PARTNERSHIP ACKNOWLEDGMENT STATE OF TEXAS COUNTY OF fARRAN'[ On this 7th day of March, 2006 before me personally appeared Les V. Whi tman to me known, who being by me duly sworn, that he/she is the General Manager of the S. J. LOUIS CONSTRUCTION OF TEXAS LTD. the Limited Partnership described in and which executed the foregoing instrument; that he/she signed his/her name thereto by order of the Board of Governors of said Limited Partnership. Notary Public /V l~"';;':"':'" - ""*'" '~c'. - . . . :: " ,-.:. < :. ,:. . ,,~ .~~----~ iE-C" JOt IES ,.','''. "'1(': ',XP'Ht' " "'OOfJ' R.S--,,':.er ~ . -. ,..--::=- ACKNOWLEDGMENT OF CORPORATE SURETY STATE OF MINNESOTA COUNTY OF HENNEPIN On this 7th day of March, 2006 before me appeared Laurent R. Laventure to be known, who being by me duly sworn, did say that he is the aforesaid Attorney-in-Fact of the L1aERTY MUTUAL FIRE INSURANCE COMPANY, a corporation; that the seal affixed to the foregoing instrument is the corporate seal of said corporation, and that said instrument was signed and sealed on behalf of said corporation by the aforesaid officer, by authority of its Board of directors, and the aforesaid officer acknowledged said instrument to be the free act and deed of said corporation. Notary Public, ... (/A-.l: i-l~1/L_/ i /. <.~' i~Li> fCft:.I.-{;. / \........ (Notary Seal) -1 ... Ii ;) o i Q. I !. .llCtII I~ ...~ -co ~~ UGl 0-= ..co Ii ~'t:I C'- ~~ ... to g~ ~... ti ~$ ~.5~ ...! 2~ 2>- ;g >Gl ...... 0'" z~ i ! ---' THIS POWER OF ATTORNEY IS NOT VALID UNLESS iT IS PRINTED ON RED BACKGROUND. 1730431 ThiS Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. LIBERTY MUTUAL FIRE INSURANCE COMPANY BOSTON,MASSACHUSETTS POWER OF ATTORNEY KNOW AlL PERSONS BY THESE PRESENTS: That Liberty Mutual Fire Insurance Company (the "Company"), a Massachusetts stock insurance company, pursuant to and by authOrity of the By-law and Authorization hereinafter set forth, does hereby name, constitute and appoint, TONY D. BECKER, NATHAN P. HUGHES, STEVEN C. ARONSON, JANET D. BUERG, TERESA HAMMERS, LAURENT R. LAVENTURE, KATHLEEN SORENSON, JOHN D. MOORE, JAMES R. PERKINS, STANLEY L. PEARSON, TODD A. KELSEY, AMY M. BURNS, ALL OF THE CITY OF BLOOMINGTON, STATE OF MINNESOTA..... "..,.. .... ... ".. ............ "".. ......"..."....... ........"..""". .".................................................., each individually if there be more than one named, its true and lawful attorney-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as Its act and deed, any and all undertakings, bonds, recognizances and other surety obligations in the penal sum not exceeding FIFTY MILLION********DOLLARS ($50,000,000.00********) each, and the execution of such undertakings, bonds. recognizances and other surety obligations, in pursuance of these presents, shall be as binding upon the Company as if they had been duly Signed by the president and attested by the secretary of the Company in their own proper persons. >. CO 't:I tn tn Gl C 'w :;, ,g >- c as _c -0 B.... >-UJ Q)w EE 00. ~~ -" o~ ...'t:I Q)C :=as oE D..as .!!! 0 :59- _0) Oc ~i ~.8 GlO .c~ _(\,I E'? ...(\,1 ;:~ 50 u..... oCf 1-..... That thiS power is made and executed pursuant to and by authority of the following By-law and Authorization: ARTICLE '><111 - Execution of Contracts: Section 5 Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Company to fTlake, execute, seal, aCknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company When so executed such instruments shall be as binding as if signed by the president and attested by the secretary By the following Instrument the chairman or the president has authorized the officer or other official named therein to appoint attorneys- i n- fact Pursuant to Article XIII, Section 5 of the By-laws, Garnet W. Elliott, Assistant Secretary of Liberty Mutual Fire Insurance Company IS hereby authorized to appoint such attorneys-in-fact as may be necessary to act in behalf of the Company to make, execute. seal. acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations That the By-law and the AuthOrization set forth above are true copies thereof and are now in full force and effect. IN WITNESS WHEREOF, this Power of Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of Liberty Mutual Fire Insurance Company has been affixed thereto in Plymouth Meeting, Pennsylvania this 27th of April . 20Q~.. LIBERTY MUTUAL FIRE INSURANCE COMPANY By ~ - .4-if~J?1s--- Garnet W, Elliott, Assi tant Secretary COMMONWE.'\L Trl OF PENNSYL VANIA 5S COUNTY OF MONTGOMERY On this 27th day of April ,2005 , before me, a Notary Public, personally came Garnet W. Elliott, to me known, and acknowledged that he is an Assistant Secretary of Liberty Mutual Fire Insurance Company; that he knows the seal of said corporation; and that he executed the above Power of Attorney and affixed the corporate seal of Liberty Mutual Fire Insurance Company thereto with the authority and at the direction of said corporation. IN TESTIMONY WHEREOF. I have her.eunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written ,/. . BY~~ NOTARIAL SEAL CAR?L O'BRiEN, Not.'uy Pubric LanSda,e Bo~o. Montgomery County ~ Cc:2::'~~~ E::ri:es UecemtoN" 31.2000 ~-'-~----- 1843140 THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. LIBERTY MUTUAL FIRE INSURANCE COMPANY BOSTON,MASSACHUSETTS POWER OF ATTORNEY KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Fire Insurance Company (the "Company"), a Massachusetts stock insurance company, pursuant to and by authority of the Bylaw and Authorization hereinafter set forth, does hereby name, constitute and appoint TONY D. BECKER, NATHAN P. HUGHES, STEVEN C. ARONSON, JANET D. BUERG, TERESA HAMMERS, LAURENT R. LAVENTURE, KATHLEEN SORENSON, JOHN D. MOORE, JAMES R. PERKINS, STANLEY L. PEARSON, TODD A. KELSEY, AMY M. BURNS, ALL OF THE CITY OF BLOOMINGTON, STATE OF MINNESOTA......................................... each individually if there be more than one named, its true and lawful attorney-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings. bonds, recognizances and other surety obligations in the penal sum not exceeding FIFTY MILLION AND 001100..................... DOLLARS ($ 50,000,000.00..... ) each, and the execution of such undertakings, bonds, recognizances and other surety obligations, in pursuance of these presents, shall be as binding upon the Company CIS If they had been duly signed bv the president and attested by the secretary of the Company in their own proper persons. That thiS power is made and executed pursuant to and by authority of the following By-law and Authonzation: Q. Q) iii Q) Q) - ,gC ..d! ;::;~ c:n Q) '0.2 ..as .....> "i ::s ^"O lij'ij) .of .. '0 .....! Cas ~.. .4>.-; 'Q) 'Q1 ..- 0.5 .sa)' ... as .. oJ>- ::U asc .",Q) .. .. ::I U ARTICLE XIII - Execution of Contracts Section 5 Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescnbe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact. subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as if signed by the president and attested by the secretary LIBERTY MUTUAL FIRE INSURANCE COMPANY :>. as "0 11l 11l Q) C 'ij) ::s .Q >- C as _C -0 ~I- >-00 Q)W Ee 00. =0 <CCW) - .. oo::!" .."0 Q)C ::as Oe c..as .!!!o .co - .. _0) Oc >-Q) :!::Q) "0:: .-- -Q) ~.Q Q)O .co::!" _C"II e<9 ..C"II .- CW) -00 c, 00 U,... 0<0 1-":' By the folklwlng instrument the chairman or the i!resident has authonzed the officer or other official named therein to appoint attorneys-in-fact: ;:>ursuant to Article XIII, Section S of tile By-Laws, Garnet W Elliott, ASSistant Secretary of Liberty Mutual Fire Insurance Company, is hereby authorized to appoint such attorneys-In-fact as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and ieliver as surety any and all undertakings, bonds recognizances and other surety obligations. That the By-law and the Authonzatlon set Ic;rth above are true copies thereof and are now in full force and effect. IN WITNESS WHEREOF this Power of Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of Liberty Mutual Fire Insurance Company has been affixed thereto in Plymouth Meeting, Pennsylvania this 8th day of November , 2005 BYC--..Jff- tW- .ca'-5tA;- Garnet W Elliott, Assistant Secretary COMMONWEALTH OF PENNSYL VANIA ss COUNTY OF MONTGOMERY On this ~ day ot November ,2005 before me, a Notary Public, personally came Gamet W. Elliott, to me known, and acknowledged that he is an Assistant Secretary of Liberty Mutual Fire Insurance Company; that he knows the seal of said corporation; and that he executed the above Power of Attorney and affixed the corporate seal of Liberty Mutual Fire Insurance Company thereto with the authority and at the direction of said corporation_ IN TESTIMONY WHS;'~ first above written. I v/':'ioO JL.t , 1),!i~unto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year I I -l CERTIFICATE BY~~ Teresa Pastella, Notary Public the undersigned, Assist~nrsec'r;tary of Liberty Mutual Fire Insurance Company, do hereby certify that the original power of attorney of which the foregOing IS a full, true and correct copy, IS in lull force and effect on the date of this certificate; and I do further certify that the officer or official who executed the said power of attorney is an Assistant Secretary specially authorized by the chairman or the president to appoint attorneys-in-fact as provided In Article XIII Section 5 of the By-laws of liberty Mutual Fire Insurance Company. This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the following vote of the board of directors of liberty Mutual Fire Insurance Company at a meeting duly called and held on the 12th day of March, 1980. VOTED thai the facsimile or mechanically reproduced signature of any assistant secretary of the company, wherever appearing upon a certified copy of any power of attorney issued by the company in connection with surety bonds, shall be valid and binding upon the company With the same force and effect as though manually affixea IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said company, this March 2006_ 7th day of PAY MEN T ..--- -",- ~,- - ~--.-.. BON D BOND NO. 190-015-846 STATE OF TEXAS KNOW ALL BY THESE PRESENTS: COtJNTY OF NUECES THAT S.J~ouis Construction of Texas, Ltd. f BEXAR Cou~ty, Texas, ~ nc f t: " . " . a ~::i LIBERTY MUTUAL FIRE INSURANCE COMPANY, a r , . "',' - ~'t a- .c MASSACHUSETTS :c ':-cd L ~n - --'- heJ SEVENTY-SIX 1 '] nE- hE :a l :T1 , ,c:~ f Texas, hereinafter ,~ t::e Ci ty of Corpus ~' " 1.1: - y , T e x as, her e in a :: t e r -TS and = rporations supplying , 'JoN C ~ k ref err e d to in the EIGHT MILLION. FOUR HUNDRED ($8,476,046.00) DOLLARS, _ Nueces County, Texas, be ~ade we blnd ourselves, ~'_ 'cessors, jci~tly and " 3T lC .:... ~~_. n' : :3 ..< THOUSAND FORTY-SIX AND e ~.,. Oi t.5-' : THE CONDITION OF THIS OBLIGATION IS SUCH "1;:-2 t- '- , ht.d :l NOW me k; r-+- LC~ (-~ c ~~. :~ r ~ a t IT h ed, .:c ::~ ~ 't! :1 + P J:= THAT: vJhereas, the t~e City of Corpus ~Opj of which is hereto tion of: J.. ;-1 r2C"- V.i'.:i_~ ., . e ,.28TlL ~C . FEBRUARY 20~, d r- f ( 1 c:-~.tr SOUTHS IDE WATER TRANSMISSION MAIN PHASE 5 HODD FIELD RD. TO WHITELEY DR. PROJECT NO, 8391 (TOTAL BASE BID "A"' $8,476,046.00) THEREFORE. ::'l;T' ; 'rn.::::::. .- v' ~, :Cj.;thf~Jly perform its dULies oersc~s, lrms, subcontractors, . .aGcr and material in the ." 3.1 '; ',t ract and any and all c ~at may hereinafter be He~ '" ~~ hereby expressly tnE:w'se to remain in full !-- .t--- -~~ -Fe , ~. c.::.::. ,r-' c ~ -, = _--< ,--,-t- .Je.-:_ " __. J, PROVIDED FURTHER l\r: j '0 ~'-' 2: act., ::;.. ~ficc t .L a Den ''2 --. t ~ filed upon this bond, 3 ~_ ~~ sh ,...-, ~" . T - +-:-...:: ,^" ,-. i L.~ t- ~ ..;::~ te: "CL'/ stipulates that no aD _ t: .. to the :.erms of the , r i?reL ".der I or the plans, :.::e same shall in anywise eE ~ereby waive notice of ~r~ 1 n addition to the terms t:T ,. _:::~ :r 1. ~T' ~ " ::: v -+= r >'"""C.--. r; , ';15, .L ==: C'jTl L 3 r .e- . ",(] , n e I~ , , ;::-,: ~. "'.:: n,E') eretlnoer. ~rl '= ;-; +- ,3 :1; T .:::. r';~ (~jIJr~ " "s 0: A~ticle 5160, =at~e statutes of ~he :::l "fIJater2-al", as used _,j J..rt2-c~e. [, ~ ~l ~ -~ ~.rerr:~ ,.- , ,c-1 :::;.::' r: ~hE Sure~y herein as -is te nctices may be oG ~n matters arising ~ 9- 0' -Je~non' s Texas ~e : eree ~JE "" 5 "j r; ",. J>~ . IN WITNESS WHEREOF, ',; r . ~ _ j e e ::' ':: :- ;,.:r:, C E>:e=.-A ::::;'-'1 L; copies, each day of t- ,- 7 th Na ;~;:h ~"---"---'-- - --,----...-- Ob PRINCIPAL (' 1 .... . ,j . Louis Construction of Texas, Ltd. ,/~ lJ4laftu<- Les V. Whi!manl General Manager 2;:-::-=--, '-,P,' ATTEST .~{-~ ret.~ Peter J. Stahl :::: >, ,::'; n~;:': SURETY lBERTY Hl'TlJAL FIRE INSURANCE COMPANY >" :', ~-}, ~_..~ - -~ ~. ------,.--- / ~/ r- . . j 'oJ f /' ~--......, - / ,f /'-':/I(!L c/~__' r -.-~: lcurent R. Laventure The Residen t Agen t of the Sure ty in Nueces Coun tv, Texas I for deli very of notice and service of process lS. Agency Contact Person Address Kee.li.,-~Sso~~t::~__ Ke\'in KeeterJ .7H Santa Fe Phone Number ~_-.i.or\lUs Christi, IX 78404 __;:.21.:: 8 8 3 - 3 8 \2L___~_.._ :..j Cat ed e;.! P <'117:-~ ;.Tile:--_ ~, k :- LIMITED PARTNERSHIP ACKNOWLEDGMENT STATE OF TEXAS COUNTY OF TARRANT On this 7th day of March, 2006 before me personally appeared Les V. Whi tman to me known, who being by me duly sworn, that he/she is the General Manager of the S. J. LOUIS CONSTRUCTION OF TEXAS LTD. the Limited Partnership described In and which executed the foregoing instrument; that he/she signed his/her name thereto by order of the Board of Governors of said Limited Partnership. /---, ~ '. .-' Jy Notary Public pr: filA.. (Nota I S ~--, i f """';'j;;; \ ' c~*~~. (~ iEV.Y J. NES M~'/ '~;.s: ';_ E X I'> ;t._. , -J,.C8nOer 2006 ._________1 ACKNOWLEDGMENT OF CORPORATE SURETY STATE OF MINNESOTA COUNTY OF HENNEPIN On this 7th day of March, 2006 before me appeared Laurent R. Laventure to be known, who being by me duly sworn, did say that he is the aforesaid Attorney-in-Fact of the LIBERTY MUTUAL FIRE INSURANCE COMPANY, a corporation; that the seal affixed to the foregoing instrument is the corporate seal of said corporation, and that said instrument was signed and sealed on behalf of said corporation by the aforesaid officer, by authority of Its Board of directors: and the aforesaid officer acknowledged said instrument to be the free act and deed of said corporation /. Notary Public, / {A!J-'e~7'-/ /\ _, ria / .,if / (Notary Seal) , .- }'::;'i(;f;:;.^^'^~^'-'^^-~^-^^V'vV\^^,"""',^ t .,~(~~~~\ ~L\THL~Et\JSORENSON ~ ? \~~~j;J . ~ot8(V !-"ubllc-Mlnnesota " ~__~/ C 5 . '_ ".....~~./ \";v -,OT':"'lSS'()~i ExpIres Jan 31,2010,2- v ~V\.sv...>l f J'>c'-"-.,"\t'V,\i'y'\/\f'.<> ."",/'V'V'V"V",^^,v\ ," 1:' THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. 1730431 This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. LIBERTY MUTUAL FIRE INSURANCE COMPANY BOSTON,MASSACHUSETTS POWER OF ATTORNEY --1 KNOW ALL PERSONS BY THESE PRESENTS That liberty Mutual Fire Insurance Company (the "Company"), a Massachusetts stock insurance company, pursuant to and by authority of the By-law and Authorization hereinafter set forth, does hereby name, constitute and appoint, TONY D. BECKER, NATHAN P. HUGHES, STEVEN C, ARONSON, JANET D. BUERG, TERESA HAMMERS, LAURENT R. LAVENTURE, KATHLEEN SORENSON, JOHN D. MOORE, JAMES R. PERKINS, STANLEY L. PEARSON, TODD A. KELSEY, AMY M. BURNS, ALL OF THE CITY OF BLOOMINGTON, STATE OF MINNESOTA... ................. .. ...... . ....... ...................................................., each individually if there be more than one named, its true and lawful attorney-in-fact to make. execute, seal, acknowledge and deliver, for and on its behalf as surety and as its act and deed, any and all undertakings, bonds, recognizances and other surety obligations in the penal sum not exceeding FIFTY MILLlON********DOLLARS ($50,000,000.00********) each, and the execution of such undertakings, bonds. recognizances and other surety obligations. in pursuance of these presents, shall be as binding upon the Company as if they had been duly signed by the president and attested by the secretary of the Company in their own proper persons. LIBERTY MUTUAL FIRE INSURANCE COMPANY >. C'Cl ~ 1/1 1/1 (I) C "0 :I ,Q >- C C'Cl =s B... >-U> Q)UJ EE 00. =0 <tC") - .. o'=" ~~ Q)C ;:C'Cl oE D..ca .!!! 0 .co - .. _0> Oc ~(I) :21 -(I) ~,Q (1)0 .c'=" -<" E~ ....<" :;:::~ C, 00 u.... 0<9 ....... oJ ;; ~ !. ~I/I j~ toTe -C'Cl i:l ...0) U(I) ":I 0- ...C'Cl !.:: .C'Cl -:I ~~ C'- :!~ -... .0 0(1) Cm ~... Ji 0.5 E ~ ...oS 0C'Cl ..... 2>- _U alC >Gl ...... 0'" z~ T'hat thiS power ,s made and executed pursuant to and by authority of the following By-law and Authorization: ARTICLE ><111 - Execution of Contracts: Section 5. Surety Bonds and Undertakings. Any officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact, subject to the limitations set forth in their respective powers of attorney shall have full power to bind the Company by their signature and execution of any such instruments and to attach thereto the seal of the Company When so executed such instruments shall be as binding as if signed by the president and attested by the secretary. By the following Instrument the chalrmarl or the president nas authorized the officer or other official named therein to appoint attorneys- in-fact Pursuant to Article XIII. Section 5 of the By-laws, Garnet W. Elliott, Assistant Secretary of Liberty Mutual Fire Insurance Company IS hereby authorized to appoint such attorneys-in-fact as may be necessary to act in behalf of the Company to make, execute. seal, acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations That the By-law and the AuthOrization set forth above are true copies thereof and are now In full force and effect. IN WITNESS WHEREOF, this Power uf Attorney has been subscribed by an authorized officer or official of the Company and the corporate seal of Liberty Mutual Fire Insurance Company has been affixed thereto in Plymouth Meeting, Pennsylvania this 27th of 6miL . 2005 . By r;:: - 4-i(&-1,~ Garnet W. Elliott, Assi ant Secretary COM~~ONWE.~,..T'H OF PENNSYLVANiA, S5 COUNTY OF MONTGOMERY On thiS 27th day of April ,2005 , before me, a Notary Public, personally came Garnet W. Elliott, to me known, and acknowledged that he is an Assistant Secretary of Liberty Mutual Fire Insurance Company; that he knows the seal of said corporation; and that he executed the above Power of Attorney and affixed the corporate seal of Liberty Mutual Fire Insurance Company thereto with the authority and at the direction of said corporation. IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year first above written /' ~ By ary Public NOTARIAL SEAL CAROL O'BRIEN, Notary Public .' Lansdale Bc~o, Mon:q;;n::;ry County !::!Y CW;'rT,:sslon E::r:>i:'es f ),C~",.,.,~,,>r -)'1 '''"'''It r " "v'""~:::~~:.~::::?_ THIS POWER OF ATTORNEY IS NOT VALID UNLESS IT IS PRINTED ON RED BACKGROUND. This Power of Attorney limits the acts of those named herein, and they have no authority to bind the Company except in the manner and to the extent herein stated. 1843134 LIBERTY MUTUAL FIRE INSURANCE COMPANY BOSTON,MASSACHUSETTS POWER OF ATTORNEY KNOW ALL PERSONS BY THESE PRESENTS: That Liberty Mutual Fire Insurance Company (the "Company"), a Massachusetts stock insurance company. pursuant to and by authonty of the By-law and Authorization hereinafter set forth, does hereby name, constitute and appoint TONY D. BECKER, NATHAN P. HUGHES, STEVEN C. ARONSON, JANET D. BUERG, TERESA HAMMERS, LAURENT R. LAVENTURE, KATHLEEN SORENSON, JOHN D. MOORE, JAMES R. PERKINS, STANLEY L. PEARSON, TODD A. KELSEY, AMY M. BURNS, ALL OF THE CITY OF BLOOMINGTON, STATE OF MINNESOTA......................................... each individually if there be more than one named, its true and lawful attorney-in-fact to make, execute, seal, acknowledge and deliver, for and on its behalf as surety and as Its acf and deed, any and all undertakings bonds. recognizances and other surety obliBations in the penal sum not exceeding FIFTY MILLION AND 00/100**"'*""*"**"*** DOLLARS ($ 50,000,000. 0""* ) each, and the execution of such undertakings, bonds. .ecoqnizances and other surety obligations. in pursuance of these presents, shall be as binding upon the r;ompanv as if they had been dulv signed "Jy tre president and attested by the secretary of the Company in their own proper persons. That tb,s power is made and executed pursuart to and by authority of the following By-law and Authorization: ... Q. G.l ,%1 en G.l G.l - .oc: .:-e ::l'll ~ Cl G> '0-= ,.: ~ (6 ~ ~'C C:'- l'll~ .0... ARTICLE Xiii Execution ot Contracts: Section S. Surety Bonds and Undertakings. i\ny officer of the Company authorized for that purpose in writing by the chairman or the president, and subject to such limitations as the chairman or the president may prescribe, shall appoint such attorneys-in-fact, as may be necessary to act in behalf of the Company to make, execute, seal acknowledge and deliver as surety any and all undertakings, bonds, recognizances and other surety obligations. Such attorneys-in-fact, subject to the limitations set forth in their respective powers of attorney, shall have full power to bind the Company by their signature and execution of any such Instruments and to attach thereto the seal of the Company. When so executed such instruments shall be as binding as .1 signed by the presidpnt and attested by the secretary LIBERTY MUTUAL FIRE INSURANCE COMPANY :>. l'll '0 I/) I/) G> c: "in ~ .0 >0 c: l'll _c: -0 ~... >oC/) G>W EE OQ. :1::0 <(M - .. O~ ...'0 G>C: 3:l'll OE l:l.l'll .!!!o .co - .. _0> Oc: >oG> ;t::G> :2! -G> ~.o G>O .c~ _C\t E~ ...N '-M -CO C, 00 0..- 0(0 ...~ By the follOWing instrument the chairman cr thE president has authOrized the officer or other official named therein to appoint attorneys-in-fact: Pursuant to Article XIII, Section 5 of the BY-Laws Garnet W. Elliott, Assistant Secretary of Liberty Mutual Fire Insurance Company, is hereby authOrized to appoint such attorneys-in-fact as may be necessary to act in behalf of the Company to make, execute, seal, acknowledge and deliver as surety any and all undertakings, bonds. recognizances and other surety obligations. That the By-law and the i\uthorization set 'orth above are true copies thereof and are now in full force and effect. IN WITNESS WHEREOF, this Power of Attorney has been subscnbed by an authorized officer or official of the Company and the corporate seal of Liberty Mutual Fire Insurance Company has been affixed thereto ,n Plymouth Meeting. Pennsylvania this 8th day of November , 2005_ "" '01 ... .!! . C:l'll ,..; .:: COMMONWEAlTH OF PENNSY'._VANIA ):l COUNTY OF MONTGOMERY 1Q) ~- 0.= Ea) - l'll ... ;g ~ IN TESTIMONY .: 5i first above written. ... ... ~ CJ BYC--~ tV - ~~ Garnet W Elliott, Assistant Secretary s~ On thiS --ill!L- day of November . 2005 before me, a Notary Public, personally came Garnet W. Elliott, to me known, and acknowledged that he is an Assistant Secretary of Liberty Mutual Fire Insurance Company; that he knows the seal of said corporation; and that he executed the above Power of Attorney and affixed the corporate seal of Liberty Mutual Fire Insurance Company thereto with the authority and at the direction of said corporation. CERTIFICATE subscribed my name and affixed my notarial seal at Plymouth Meeting, Pennsylvania, on the day and year BY~~ Teresa Pastella, Notary Public the undersigned, Assistant Secretary of Liberty Mutual Fire Insurance Company, do hereby certify that the original power of attorney of which the foregOing is a full, true and correct copy. 's in full force and effect on the date of this certificate; and I do further certify that the officer or official who executed the said power of attorney is an Assistant Secretary specially authorized by the chairman or the president to appoint attomeys-in-fact as provided In Article XIII. Section 5 of the By-laws. of Liberty Mutual Fire Insurance Company. This certificate and the above power of attorney may be signed by facsimile or mechanically reproduced signatures under and by authority of the following vote of the board of directors of Uberty Mutual Fire Insurance Company at a meeting duly called and held on the 12th day of March, 1980. VOTED that the facsimile or mechanically reproduced signature of any assistant secretary of the company, wherever appearing upon a certified copy of any power of attorney issued by the company in connection with surety bonds, shall be valid and binding upon the company with the same force and effect as though manually affixed IN TESTIMONY WHEREOF, I have hereunto subscribed my name and affixed the corporate seal of the said company, this March 2006 7th day of 'r1 , , !)E 1: 53AM; Pdge ,38/40 ~ == CITY OF CORPUS CHRISTI DISCLOSURE OF INTERESTS ::c t Y of c:orpu3 Chr 1St, O"'dinance 17112, as amended, requi :res all persons or finns seeking tl do business ].lith the City to provide the following information. Every quest.ion must :)E' answerpd. It the qu~stlon is not applicable, answer with "NA". FIRM N>>fE' S:J. l-9\AI$ ~S1l2-lA.~C;J..J of ~~~. B'l'REBT:_'1S(P2. lC(l.El-JE ST. I itlct__ ..~ CIT'{: SAtJ A-lTD!-JI() FIRH is C;orpc.rat tun 0 LPartnershg )Q 3. Sole Cwn@r 0 4. Association 0 ZIP: 182-t I.. at her 0 01 BCLOstJR.I Qtn S'nON'S i.t additior)/i,l apace is neces:3a:ty, pleaae usa the reverse "ide of this pagB or attach separate sheet. 1. lute trna ~. of "oh ".-ployee" of ~ Ci ty o~ Coxpua Chrieti having ~ n~ahip inter.at" ooneUtutihg 3\ or aore of the owner.hip in the above naa-.:l "fix."". Name Job Title and City Department (if known) N.A- l-JDf-Jr; :2. Sbt:AI the naaes oE -.ch "'of'f'icial" of' th. City ~ Coxpa Chri..ti having en "'owner1Jh.ip iDt:.eJ:..t"" oon.tituting 3\ or aor. of th. owner.hip i.n ~ abo1nI Ila.1DGCi "'~ira". N411ne Tit 1 e ~. t-jDt-JE 3. St:at.8 t.h4I ~ of....oh "board -..ber" of the Ci ty oE Coq=. Chri.ti ha.-i.nq an "'own.r.hip intAr..t- coneUtuting 3\ or aore of' t:lw owner.hip .in the above naaed ".1.~.., Name . t-JA.'- t-J~tS Board, commission Q~ Committee 4. Bt:ate the naaee of .;aah erIIpl~ or ot'l'icer o~ . "oonaul~t" for t:ha Ci.ty ot' Corpua Cbl:'i.U who worked qn IIDY _tt:er related to the .ubjeot of thi. coner.at and baa an "'()tfIWrehi.p in~.t" oocuatituting 3' or ..ore of' the owner_hip in ~ ~e naaecl ..fLra.... Name t--! Cf-J E N.A.~-_~_ _. r:UJ1sul tant CERTIFICATE I certify that all i,nfo:rmat1on provided is true and co.rLtect as of the date of this statement, that I have not knowingly withheld discloBure of any information request@di and that $upplemental statements wi 11 be promptly nubrni tted to the City of Corpus Chr1s~1, Texas as chanqe~ occur C~rtifying person:_ p~V'O A. D\ ISr-6"Dt--J ..~_Title: VILE fre;l~lJr /c;,OJT~TY-IViA~f-. (Type r rintl A' pA;, CIIle' SIgnature of Certifying P",rson: _~,.;.J. , n__._ Date: 1(2.5/010 ?--(l (of&, IR4>v!se4 PROPOSAL FORlol vAGI': 14 OF 15 ADDENDUM NO - 1,. At;t:aohaMmt No.' paqe 14 of 15 ..... ... , ; ~ Jb 1: 53AM; Page 40/40 .wi .J.llIli!W'" .". DEFINITIONS a "Board Member". A member of any board. commission or committee appointed by the City Council of the City Of Corpus Christi, Texas. b "employee". Any person employed by the City of Corpus Chrtsti, Te)(85, either on a full or part time basis, but not as an independent contractor. c. "Firm" Any enuty operated for economic gain, Whether profe88ionaI.' - I IodustJia\ Of commoroial end whether eItabIi~ec:1 to produce or d.eal with a produc;t or service, InCluding but not 1Im~ to, en~ operated In the form of ... pmprletofahlp. as "f-employed pEnOn, portnership. ci:lrpor8tion, joint stock company, Joint venture, receivership or trust and erttlties wtlich. for purposes of taxBtion. ete treated as non-proflt organixatiOns. d. "OftIciar. The Mayor, m~ of the City Council, City Man~. Oep,uty City Man8Q8r, ~stant City Managers, Oepertment and Oivlsion Heads and MunIcipal Court Judges of the City Of Corpus Chrtsti, Texas. e "OWnership Intefest". Leg.1 01 equitable Interest whether IlICtualty or 00flI~ held, In a nrm. including when 8UCh \r1ter'nt ishekllh~ an agent. trust, estate or holding entity. .ConatrudivelY hekr referstD holding or control Mt8bIished through voting!trusts. proxies Of speciat terms of venture or pertnef8hlp agreemenf:$. "Contutta"r. Any penson; or finn. such as engIneerS and an::hitects. hired by the City of Corpus Christl for the purpose of profesSiOnal odnsuItatIon end mcommendatlon. !Revi:Jodl PROPOSlU. roftM PIUiE 15 OF' l~ ADDZNDUM NO. 1 Attachllent No. :i1 Pap 15 o~ 15' r--- I ACORQM i : .::qCy::; CERTIFICATE OF LIABILITY INSURANCE 15? no lCU DA TE (MMJDDIYY) 3/08/06 THIS CERTIFICATE is ISSUED AS A MATTER OF INFORMATION ONL Y A ND CONFERS NO RIGHTS UPON THE CERTIFICATE I-iOLDER THIS CERTiFICATE DOES NOT AMEND, EXTEND OR A,L TER THE COVERAGE AFFORDED BY THE POLICIES BELOW ;;OMPAHIES AFFORDING COVERAGE Acord! 4300 \1a!ketPOInte Ur:r60 Bloomi'lc:on, MN J)4 5 )Mp:,N"y A. ZUrich! ns Co (MN Construction) 'iSlRf- S.J LJUI') Constructlor of Texas T:) 520 Sow h Sixth A venue Mansfiel(j TX 76063 :\JMPt";\JY B American Guarantee{c/o McLeanO) .OMPf\NY Flremans Fund Ins Co (Chicago) ~OMPANY o COVERAGES: '"HIS is TO CERTifY THAT THE POLICIES OF ,NSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDiCATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFiCATE MAY BE ISSUED OR MAy PERTAIN THE NSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSiONS AND CONDITIONS OF SUCH PCLlCIES L1MI"S SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, '.YPE OF .,~L;f..-ANCE ;:>Que -. "\lU-ABER ~)LiCY =.FFECT'VE >:;l(,::CCY EXPIRA TiQN J~ TE ,MM,OO/YY', JA TE IMM,oOfYY) .A 3B'>.iERAL UABIUT- X -'OMMERCIAL ,ENt:RAL L:ABIL fji CLAIMS MADE X )U liR (;,D9:'0720C , 1/01/05 11/0106 LIMITS GENERAL AGGREGATE I $ 2000000 PRODUCTS. COMP/OP AGG $ 2000000 PERSONAL & ADV INJ URY 1000000 EACH OCCURRENCE 1000000 FIRE DAMAGE (Anyone fire) 3:10000 MEO EXP (Anyone person) lCOGO COMBINED SINGLE LIMIT 1000000 BODILY INJURY (Per person) : BODILY INJURY I (Per accident) e~--~~~ PROPERTY DAMAGE AUTO ONLY. EA ACCIDENT ! OTHER THAN AUTO ONLY: EACH ACCIDENT $ AGGREGATE $ (;WNER'S & C-'NT"" .L\C TOR PI~() T '_l: ~ Per P!?J Aqqreqate t-"---.----..-- A :;M O~LE ,-lABI :x:: 'IN'l .l\UTO B~,P9:3 ;7199 1:01,05 11/01'06 OWNED ;.\ O,C HEDULED ;. :{ "IRED AUTO~ :{ ~ON~OWNED .',: Tee. $1000 ';ornp X $1000 Coli i ~ , )~~A:;E UABIUT'v .\NY AUTO , rB-'~,:.;-;~~~~ -_lABIliTY' '< ,MBRELLA H,"M j OTHER THAN ;.JMBRELLA :ORfV: r7'~'ORKERS COMPENS~' eN AN' ':~v1Pl_::::YERS' UABIL AliC4: 75280 1 1/01/05 11/01,06 EACH OCCURRENCE , AGGREGATE $ $ $ OTH-I ER ' BOOOOOO BOOOOOO WC9311720102 '1101-05 11/0106 1000000 Hel , is I , EL DISEASE. POLICY LIMIT I $ EL DISEASE. EA EMPLOYEE I $ 1000000 r- de PROPRIETOR! lA..RTIIJERSJEXECU 1 )F'ICERS ARE :{ !NC 1000000 "'T<-_EO Ml197.J07463 , 1 f01 05 11/01.06 p"tallation Fit $7,500,000 limit. $250,000 in transit, $250,000 at temporary location ~ ,.-.-,--.--.-..-....---...-. lJESCRlp-rlCN OF OPERA~,r)NSiL:)CA c:ONSNE~I')LESiSPE': AL ITEMS , Proj. #8391 SOlJthside Water Transmission Main Phase 5e,ty CJt Corpus ;hnstl IS nameo additional insured With r"spects to Genel al L:ability ..>S. A,uto Uab ofr above referenced pr(~ect 3S reqUired by contract. ,: Cancella~n. notice as required by contract. CERTfFICA TtfHi)LDER Corpus Christi Engln Services Attn: ,ontract AdmlnstratCl POBox 9277 CANCELLA TION )rlCuLD ~,~y )F 'HE ~BOVE JESCRIBED POLICIES BE CANCELLED BEFORE THE Corpu~, Clristl T X'8469 -=-_<;:'!P./oT'OI\ :),:IT= THE~=OF, ~HE iSSUING COMPANY 'NILL ENDEAVOR TO MAIL l~cA yS NRITTE~ '<mCE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, -J'iT ~':ucwRE -j "'AIL. ~JCH ~OTICE SHALL iMPOSE ~o OBLIGATION OR LIABILITY jF "",Y ~IND PON ~HE COM PANY <THOP!ZED R ENTAT"JE c:li .~ a:t/'V~-<-r ACORD 25-5(1/95\ 70- 56 DA TE (M MIDDIYY) 3/08/06 THIS CERTIFICATE IS ISSUED AS A MA TIER OF INFORMATION JNL Y AND CONFERS NO RIGHTS UPON THE CERTIFICATE i10LDER THIS CERTIFICATE DOES NOT AMEND, EXTEND OR At TER THE COVERAGE AFFORDED BY THE POLICIES BELOW _._~_.'..-- u.~Qrv1PANIES AFFORDING COVERAGE ~_ Ipp~__~ORD. ! CERTIFICAtE OF LIABILITY INSURANCE ]5 '.831;-WOO Acorrj", 430p [\/arketPolntE' [) #!- ;0 BIOOI'lIf1qton MN S 5B 5 " ;~,1(.:.^d~'. ZUriCh Ins Co (MN Construction) ~'JE: , -l)~J;J/l.,N-( S J ",.OUIS Construction 0' y Texas L TO 520 South Sixth Avenue Mansfie!d TX 76063 American Guarantee(c/o McLeanO) i'UfI.WANV Firemans Fund Ins Co (Chicago) rHIS is TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD iNDICATED, NOTWITHSTANDING ANY REQUIREMENT TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS :ERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, E"eLUSIONS AND CONDITIONS OF SuCH POLICIES LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, --- . .-. ,___u_ -- '. .u ---, , --~~~i~~~;FECTIVE : "OLlCY S<PlRA TlON ! T\/PEC~ ;N,':'.;~A,NCf 0tJI ':Y', JM6EQ D:.TE{MM/DOIYY) OA"7"E(MMJODIYY) I i~OMPANY o COVERAGI;S _L ~ -:'"0 --'-----. _._----" I A :;8JERAL L!ABlli~ :i COMMERCIAL GE r...lERAL L;AB,UT< I CLAIMS MA_Of X OCCL--q i ')WNERS" :O~ 'P~CTORS PRe I ".., Per PrOJ, r~ AQQreqate________ ----- ----- A _-.J,T. ClM08ILIE lIASllIT '/' 8Apc '07199 :l, ""-NY AU fO /-' ! -, ALL OWNED 'UI i I I i ! i I / I ! k lB. ECESS UABILlT' ! -~--JMBRELLA F JRM ,LOC'l07200 11/01i05 11/01/06 I .- /' 11/0' iDS 11/01/06 ( '3CHEDUlED ,1Ul ~IREO AUTC' ~ON-OWNEl. ;U' x $1000_Comp ., $1000 Call x, ,:;,.l,RAGE UABIUT A.NY AUTO --i- ;l,UC4n52BO/ .f , 1/01/05 11/01/06 L- OTHER THAN UMBRELLA FORM 1,' A WORKERS COMPENSA -'eN AND (' EMPUJYER$' UABiL.!T -{ WC9:10720102 , l/Ql/OS 11/01106 I I(' 1 HE PROPRIETOR; :< NC. P"RTNERSlEXECIJTiVE OFFICERS ARE u-L~.!:..__ C C""''"-<E"R MZI9 '907463 11/01/05 11/01/06 "Istallatlon F't" , I DESCRIPTION a= OPERA T10NSlLOCA TIONS/vErICLES/SPE::IAL ITEMS ------..,- ---.--.---- , PI'OJ #8391 Sauthside Water TransmiSSion Main Phase ~),Clty of Corpus . Christi is named additional Insured with respects to General liability / & ,4uto Liab ofr above referenced proJec as required by contract, Cancellllion notice as re ulred b contract. GOOIFICA ~LDER LIMITS GENERAL AGGREGATE PRODUCTS. COMPIOP AGG PERSONAL & ADV INJURY EACH OCCURRENCE 2000000 2000000 1000000 1000000 300000 10000 FIRE DAMAGE (Anyone fire) MED EXP (Anyone person) $ , COMBINED SINGLE LIMIT V 1000000 BODILY INJURY (Per person) BODILY INJURY (Per accident) : PROPERTY DAMAGE AUTO ONLY. EA ACCIDENT OTHER THAN AUTO ONLY: EACH ACCIOENT AGGREGATE $ EACH OCCURRENCE AGGREGA TE 8000000 BOOOO 00 x OTH. ER 1000000 1000000 1000000 EL DISEASE. POLICY LIMIT EL DISEASE. EA EMPLOYEE , I $7,500,000 limit. $250,000 in transit, $250,000 at temporary location Corpus Christi Engin, Services Attn: Contract Admmstrator POBox 9277 Corpus Christi TX 78469 / / V CANCELLATION I SHOULD "NY OF THE ,BOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE I /'EXPIRA TION JATE THEREOF. THE ISSUING COMPANY WILL ENDEAVOR TO MAIL '{ --.l2... DA YS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, I BU' "AlLURE TO MAIL oUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY I ACORD 25~' (1195) 70- 56 ::=+11-13RC=_'I.L GENERP.L LLZl.BIL'::TY TT-:~ :; ~)i'"'JC'ESE:.:El:J': '=:-~::"":'JG~ ~ sr,'r ~ '~",' - -"~--- ::::E:..=GE ?s';\.D r: ':''illEFl'LLY v '.DDmO'l.-\.L ;)ISTJRED - OW'iERS, LESSEES,OR C)NTR.'\.CT:JRS~FiJR-\{ B) ef1dc:rse;p.e~.t: -lod.:.::..:=s 2..::.3-~:-3.nce ;::-:;-.~ided ur:.der ::'be foll:l:wing: y =Crf>1E?~C=A'=.3EXER..~ LI~~IL~T~'" L:CJ"';.I~R...~G2 P_t;RT SC!-!EC:JLE Name ~= ~er3on ~r Or?~~iza~icn: :.:.tv ;~i ':oroL.:.S Ch.=i~t~ vlDep~rtme~t ;t Engineering Servlces ATTN Cont=act Admlnlstrator ?,O 30)'. 9271 :orpus Christi, 7exas "8469-927~ (If 1"1::> em:ry appears ~bove, Lr:formatL::r: requlred to c:lmplete ~his endorsement will be shoW!'. In the Decla,rat con as appl icable to th.:.s endorsement,) WHO ~s .W INSLlED (SC!ction I.I) lS dmended :0 L:lclude as an insured the person or organization shown in =he SchedUl=, but only wlth respect to ~iability arising out of "you.1: 'J/ork" for that _nsured by c::- E::;r you. Named ensured: S. J, Louis Construction of Texas, Ltd. v Pol.l.C\' Number: GLO 9307200 v Sf::eC-=-'fe ::::'ace :r -~h:;:, Sndcrse':1ent 3/8/06 Author 2. zed 'R.eDreseritac:. ~J'e : ~c?~ U. ~~ ~4' Name "rintedi Beverly A. Sprelgl, CPCU Tit_e ?::-lntec) Sr. Account Manager v ,::r:; ::; Q :-:5 TE 99 OlB v ADDITIONAL Il'iSLllED ~'.1:S endcrse::nent: ','cc.i::.e,' L::--,Si.::-:nce D:-:;';:::ied 'mder '::l::e fol':'owi:lg: I ./ BUSINESS .;UTO COVERAGE FORM GARAGE COVERAGE FORM TRUCKERS COVElL~GE ?OR.'f :-his e:l.d.orseme!1t. ~~hanges c!"'...e :Jolic~/ ef=~c::::..~.re or:.. the incepr.icn da:e ::)f the Qol.:.cy 1.U1less anoc:ner dace ':'5 ir.di::a:ed :::el::w: Er...dorsement: Sffec::i~,,"e / :?ol:.:;y Number V' 3/8/06 SAP 9307199 Named Insured j ~~ct. ~ Countersi~d by (Authorized Representative) S. J, Louis Construction of Texas, Ltd, / The provis~ons and exclusions t~AC applv ~~ LL~ILITY COVE~\GE also apply co this endorsemer.c. c_:y of:orpus Christl Cept. of Engineering Se=v:.ces Attn; Contract Adminlstrator P O. Box 9277 Corpus Christi, TX 78469 9277 (Snter Name and Address sf Additional !nsured.) is an insured, omis s iens or a policy. but only wit:, respect :0 legal responsibility Eor acts or pe:'son Eor .....hom Liabil~:y :overage is afforded under this The additional insured 15 not re~Jired to pay for any premiums stated in the policy or earned from the polie/. Any return premium and any dividend, if applicable, declared by us shall be paid :0 you. You are authorized t:J ace: f:Jr the addit.ional insured i:1 all matters pertaining ~o this LnSUrance. We ',viII mail ::::le .idditional ~r.sured pol~::y. If :he car:.cellaci::n _.:1 by us additional insured. nOC1.:e :Jf any cancellation of this ~e ~ill give :e~ days nocice to the The a.dditional ::..nsu=:ed >/111 'ret.ain any :::-:.qhc .JE recovery as a claimant: under c.h.::..s policy ?OEM '!'E 99 01':] ADD~TICN~ L~SURED Texas Standard Automobile Endorsement Prescribed March 18, 1992 =J~~ERC=?~ GENE~~ ~I.~r~ITY f"H:S S)TL<JR3EI~t?l.rT '=r--=,~':G;~~ ~S2: :';:'L:=~.:' - :?~E-;SE ::{R::W T.,., C~?ill3FT_)"LL~{ ITX.~S C:c{.:...NGES - :1.....\iENDrviENT OF 'o/ :ANCELL.-',. TIiJN PROVISIONS OR COVERAGE CHA.NGE ~~. endcr3emec~ ~od~fles .~3Urance provlded under the following: / COMHER'::::.=ili}ENEF_;:'.L :"':.;Z::L::T'::: CCVEEAGE P.'\..RT LIQUOR LIAB ILlY! C::J'JER..lI..GE P.ZillT OWNERS o~ ':::ONTR..~CTORS PROTECTI~JE LI?BILITY COVERP.GE Pp..RT POLLUTION LIABILITY CSVEEAGE PART PRODUCTS/CC~'IPLETEJ: OPE-:U\.TlONS LIABIL':TY COVERAGE PART RAILROAD PEJTECTIVE LIABILITY CO\lERAGE P1<..RT 1:1 t:he ever_t 0: carlcella::i::;n or material change that reduces or restricts the insuranc~\affcrded by this Coverage Part, we agree to mai ~ prier ;.Jrl :.ti~n noti ::eaf cancellation or material change to: Schedule , Name. SEE BELO\'l 2 Address; SEE BELOW 3 Number of daiS ad-/"'ince nocice: THIRTY (30) v City of Corpus Chrlsti Dept. cf Engineerir:g SerJ"ices Attn: Contract Administrator P.O. Box 9277 Corpus Chris:.i, TX 78469-9277 y Named Insured; S. J. Louis Construction of Texas, Ltd. v I?o 1 i::.y Number:_ GLO 9307200 ~ EfEec~ive Date of This Endorsement; 3/8/06 Au:.h::>rized Represe::tatlo;-,,;: ~~ << -/~ L/Cy V" / Name print:ed); Beverly A. Spreigl, CPCU Ti -:.12 (?rinted) Sr. Account Manager eGO 2 Q 5 (11- 85) TE 02 02A ~ C\...'1CELLATION" PROnSIOl'i OR COV"ERAGE CH..-\J.'iGE ENDORSElYlENT ....,.~ -::nc.crJr2i'"1~n: :tC_l':' ':'~5 . :~Sl..:::2r::.:e pr:c-r/::..c.ed ~der the : "J:"lGwing : " 1-~JSTIiESS A.UTO COVERAGE FORM I GAP~GE COVERAGE FORM I 7RUCKERS COVERAGE FORM '-- T~_lS "nc.c;r:-serr.errc ::ha.:-"ges ::::e ::;oli:::', eEfecci'Te sn tl::.e lncepclon dal:e oE che policy un:ess anot~er date lS lrrd::::ated below: ~~d~~semenc ~ff~ct~'le / ~ poli.::'f :i'umber 38/06 BAP 9307199 v S. J Louis Construction of Texas, Ltd ..; ~ /<~~ c::f. ~ c6un cers igned' by (Authorized Representative) ~ ./ Named I:lsnrec THIRTY (3 oj 1 changed to reduce or or change to: days before this ?oli~/ is cancelled or materially restrl';C cO'Terage we will mai:o not.ice of the cancellation v SEE BELOW SEE BELOW Snter Name and Address) Cicy of Corpus Christi De"t - of Engineering Sero.rices Atcn: Contract Administrat.or i?, :, Box 9277 Corpus Christi, TX 78469-9277 Autnor.:.zed Representative: ~~~ 4~~ N'ame ?r'iuce:J.): Beverly A. Sprelgl, CPCU T~t_e Pr':':J.t~d. _?r,AccountManager C/cc:;r FOR~ T~ 02 02A - 2ANCELLATION PROVISION OR COVERAGB CHANGE ENDORSEMENT Texaa Standard Automobile Endors~ent Prescribed ~ovember 1, 1987 ~JRKERS C::.L?EN'S.:';.TION AlE SM?:OY"RS ::::ABI:'IT'[ ::::;S!JR.~"l'CE ::OL::::':-;: v we 42 a 6 01 (Ed. '7-84) TE:<~..~ ::-:-':::C2 "1..'\ ':'ER:.;:':'==~.l'lGE ;cIDO R.3 E:MENT ~'~:.:.s '=Y1.:::: 3err,f::'..._ ';:own :. ':':'n 3 .. -:.r~c___e_ :Jn~,- ':) :':e ....::sura.nce 8: t~~ =~:C~2t::~ ?age. ;,-,:':Yt:J.2':: policy because T~xas is ~:. tL2: -I~: .'. :'r :::a:-:.::e_=l.: 'r> ,~, =::::e.=- :~:ac.er:.a_ _:ha..:-~ce ~:: :te ;.:Jlicy, fiJe will mail adv3.nce ::garnza::C2 ::amed :::1 'Z;.,e ScheiuJ.~. 'I'he nt:m.ber cf days 3d'laIlce ~Gtice -~ ~~e =e=so~ ::;cice s .:nc:,...n _:-~ :::2 ..: - he_::i~__=-= -~~S 2nc~~~eme~: ;~d~ ~~e S.:hed1_::-=. : ::::pe:::-3.-:: j.:.::"':cr:l:-I 81"" :.:::i.:..:t"e::::::'~~ _'....J 'Jenefit anyone nat: :lamed in Sc.hed\.l':"~ Number' :;f days ].d~lar::. "e nct:.i:~. } V Nct:=e will be ma_le :0 :::ity 0:: CCrpL:3 Chr:sti Deoartment o~ Engineering Services ~ttn Concra,:t Admi~istr~tor P.O. Box 927~ ,::c=pus :hr i s t TX ,~ 9 4 6 J - :1 2 7 7 v T~~s endorsement changes tne policy to which lt is attached and is effective on the date ~5sued unless other....::.se stated. (T:.e information below is required only when this '~n.dorsement is issued sub.~equent to preparation of the policy.) V' Endorsement Effecti'/",: 3/8/06 ?-Jli.=y No_ WC 930720102 Endorsement No_ ::;~sured s. Louis Construction of Texas. Ltd. / Premi urn $ V c,""~er'igned ,!.~~?l ~C/t:4' Name : ?::-inted): Beverly A. Spreig. CPCU '-:::mranc," C:mpany Zurich Insurance Co ,I'" ~ 2 6 :;.,:} - 3 :' 1:'" c:: - ?rint ed) Sr. Account Manager