HomeMy WebLinkAboutC2008-350 - 9/18/2008 - NAAMENDMENT N0.4
TO CONTRACT FOR
PROFESSIONAL SERVICES
The City of Corpus Christi, Texas hereinafter called "CITY", and HDR ENGINEERING INC., hereinafter called
"Consultant," agree to the following amendment to the Contract for Professional Services for Garcia Arts
Center Area Street Improvements IProiect Nos. 6133 & 61341. as authorized and administratively amended
by:
Ori final Contract Se tember 18, 2001 Motion No. 2001-359 $59 892.00
Amendment No. 1 Se tember 24, 2002 Administrative A royal $3,989.00
Amendment No. 2 Janua 13, 2003 Administrative A royal $7 760.00
Amendment No. 3 Au ust 15, 2007 Administrative A royal $24,785.00
In the original contract, Section 1. SCOPE OF SERVICES, A. Basic Services, 3. Bid Phase and 4.
Construction Phase shall be modified as shown on the attached Exhibit "A" due to increases in project
scope.
• In the original contract, Section IV. FEES shall be modified as shown on the attached Exhibit "A" for a
revised fee not to exceed $13.779.00 (Thirteen Thousand Seven Hundred Seventy-Nine Dollars and Zero
Cents , for a total restated fee not to exceed $110.205.00 (One Hundred Ten Thousand Two Hundred
Five Dollars and Zero Centsl.
All other terms and conditions of the September 18, 2001 contract and amendments between the City and
Consultant will remain in full force and effect.
CITY OF CORPUS CHRISTI
07( Yho ~/~'u8
Oscar Martinez Date
Assistant City Manager
RECOMMENDED
1 ~D~~ ~
Ke in R. Stowers ate
Interim Director of Engineering Services
ATTEST
Arm ndo Chapa, City etary
APPROVED AS T FORM-
i7 '
Assi t n ity Attorney Date
2008-350
09/18/08
ircia MsVVnA. No. 4VVnE. No. 4.GOc
HDR ENGINEERING INC.
~~~ ~ iii
Carl E. Crull, P.E. Date
Vice President
555 N. Carancahua, Suite 1650
Corpus Christi, Texas 78478
Phone: 361-857-2211: Fax: 361-857-7234
Project Number: 6133,~5-~/ /7D(o/S
Funding Source:'~@@E)-159-00000-858-3
Encumbrance Number: /
AMD. N0.4
Pa e1of1
HDR Engineering
SHINER MOSEI.EY
~.- ~ AND ASSOCIATE$r INC.
July 28, 2008
Mc Kevin Stowers,
Department of Engineering Services
City of Corpus Christi
PO Box 9277
Corpus Christi, Texas 78469-9277
,, JU1- 2 9 ZOOS
1NEEAING SERVICES
ENG~
RE: AMENDMENT NO. 4 FOR GARCIA ARTS AREA STREET IMPROVEMENTS
(CITY PROJ # 6133!6134)
Dear Mr. Stowers:
This letter is to outline the scope of work changes and additional work in the above referenced
project and request approval of Amendment No. 4 to our original contract for professional
services.. Additionally, this letter is to communicate the fact that our original contract for
engineering services was signed in 2001, labor rates and expenses have increased significantly,
and those contract fees For professional servicesateed to be amended due to project delays.
During the bid phase of the above referenced project, HDR, at the request of City staff, made
significant efforts beyond normal reference checks to contact entities that the apparent low
bidder, Salinas Construction Technologies, Ltd. had performed work for. The original contract
for professional services states that HDR will "attend bid opening, analyze bids, evaluate,
prepare bid tabulation, and make recommendation concerning award of the contract". Since
Salinas was the only bidder on the project and they had a negative history with the City of
Corpus Christi, HDR was able to receive comments from nine entities that Salinas had worked
for in order to determine if Salinas was a qualified contractor for the proposed work. The work
performed to make contact with the submitted references was above and beyond the expected
scope in the original contract and warrants a review of the scope and fee for the project bid
phase services.
Since the start of construction HDR. has absorbed many of the construction phase project
management responsibilities of this project. The original contract states "HDR is responsible
for making site visits to observe general progress and quality of work and this will not be
confused with the project representative observation or continuous monitoring of the progress
of construction". There has been numerous 'contractor related issues that HDR has had to
resolve on site that have warranted multiple site visits outside the definition of "observe general
progress".
NDREnpineodnp,lnc. 1555NCarencahua Phone106g857~2111i AMD.NOi4
$uiio 1650 Fax X3511051-R34 EXHIBIT A
Corpus CNisli, TX 7&1780010 swxehdrinaeom pa e 1 of 3
Mr. Kevin Stowers
~nsnoos
Page 2 of 3'
The issues that have resulted in additional site visits include:
• Storm water inlets constructed at the incorrect grade and incorrebt location (Reference
Attachment 1).
• Sanitary sewer manhole constructed at the incorrect location (Reference Attachment 2):
' • Driveway conflicts with homeowners and the contractors (Reference Attachment 3).
• Location of site utilities and driveways for the proposed child development center
(Reference Attachment 4)..
• Several survey-related grade and alignment issues with the layout ofthe streets, curb.8c
gutter, and utilities.
• Incorrect placement of reinforcing within the curb 8c gutter (Reference Attachment 5).
• ~ Conflicf with AEP utility poles. and. the tjmely removal of the poles within the project
limits (Reference Attachment 6).
• Proposed sidewalk ramps, conflicted. with. the actual locations that AEP installed their
new poles (Reference Attachment 7): ~. .
• An alternative sidewalk' drain was requested to be designed (Reference Attachmertt 8).
The original contract also states that "HDR will provide interpretations and clarifications of the
contract documents for the contractor and authorize minor changes, .which do not affect the
contractor's price-and are not contrary to. the .general interest of the. City under the contract".
During construction HDR has received seventeen requests for clarifications to the contract
documents, six. of which would authorize maJor changes. All, of the requests have been
confirmed and communicated with-the `City personnel however all of them have resulted in
significant additional time and expenses. .
Bidding and construction of this project was delayed between 2002 and 2007 due to final."
design changes in the alignment of Marguerite Street,. issues .with the removal of acquired
houses and the Marguerite Child Development Center, and availability. of funds to begin
construction. Construction began in August 2007. During the intervening five years, salaries
and benefits have increased approximately.21% (4%/ year compounded) leading us to request
an adjustment in the' original fees for bid and construction plisse services.'. Applying the 21•%
increase to'the original fees for these services results in an increase'of $785.00 for bid phase
services and $1,623.00 for construction phase services.
The'above related bid phase services, additional site visits, interpretations and clarifications,
and the fact that the original contract is approximately six years old, warrant a review of the
scope and fee for the project.. We request that the contract be amended to increase the fee for
these changes (Attachment 9). The changes in fee are shown on the below table end includes
' the current fee antathe amended fee. We have also attached a statistical summary of the man-
., hours and expenses applied to making the scope changes.
AMD. N0.4
EXHIBIT °A"
Pa e2of3
Mr. Kevin Stowers
728/2008
Page 3 of 3
Summary of Fees
Permit Pre aration 0.00 0.00 0.00 0.00 0.00 0.00
OW Ac uisition 3,900.00 0.00 0.00 0.00 0.00 3,900.00
To o ra hie Surve 6,990.00
Environmental Assess 0.00 0.00
0:00 0.00
0.00 0.00
0.00 O.DO 6,990.00
0.00 $0.00
Construction Obs 0.00 0.00 0.00 0.00 0.00 $0.1)0
Start-u Services 0.00 0.00 0.00 0.00 0.00 $0.00
Warrant Services 0.00 0.00 0.00 0.00 0.00 $0.00
SCADA 0:00 0.00 0.00 0.00 0.00 $0.00
Citizen Meetin s 0.00 1 657.00 0.00 0.00 0.00 1 657.00
Alignment Impacts 0.00 0.00 7,760,00 0.00 0.00 7,760.00
Subtottil Additional 10,890.00
TOTAL AUTH FEE 59 892:00 1,657.00
3 989.00 7,760.00
7,760.00 0.00
24,785.00 0.00 20,307.00
13,779.00 110,205._00
Your favorable review of this amendment to the contract is appreciated. Should you have any
questions, please call.
Sincerely;
HDR ENGINES G, INC.
Scott .Harris, .E.
Project Engineer
SMH/cc
Carl E. Crull, P.E.
Vice President
Attachments: 1. Summary of Additional Work related to storm water inlets /manholes
2. Summary of Additional Work related to sanitary sewer manhole
3. Summary of Additional Work related to additional driveway
4. Summary of Additional Work related to Neighborhood Center Building
5. Summary of Additional Work related to reinforcing steel in curb & gutters
G. Summary of Additional Work relnicd to AEP pole interference with construction
7. Summary of Additional Work related to sidewalk ramps, extension, and ADA
compliance.
8. Summary of Additional Work related to alternative sidewalk drain
9. AMENDMENT 4-Garcia Arts Area Street Improvements (City Proj# 6133/6134)
10. Statistical Summary of Amended Pecs
AMD. N0.4
EXHIBIT "A"
pa e3of3
Attachment 1:
Summary of Additional Work related to storm water inlets /manholes:
1. Storm water inlet placed at incorrect location at Proposed CI B-6, Marguerite
Street STA 1+87.
2. Additional work:
a. 2-site visits
b. Submittal approval
c. Design of proposed catch basin conversion
Timeline for CI B-6:
a. Unknown: Contractor installed curb inlet (CI) B-6 directly across
Marguerite Street from B-5. Plans show 18" STRM at an angle across
Marguerite Street to accommodate for small lots and proposed driveways
along south side of street.
b. Week of March 18`h: Construction Services requested HDR to meet at
project site to look at possible courses of action.
c. March 18th: Marty Schmitt sent sketch of proposal to move driveways due
to the contractors' error (Exhibit A). HDR concurred with course of action
to move driveways and adjust driveway flazes to accommodate incorrect
storm inlet.
d. Unknown date during March: Property owner contacted City to request a
larger than proposed driveway be constructed in front of his property.
Larger driveway would again conflict with March 18`h plan to modify
driveways around the incorrectly placed storm inlet.
e. City Construction Services requested HDR to provide a design to modify
the proposed storm inlet into a catch basin that would located within the
concrete driveway. After second site visit to take photographs and
measurements, HDR provided design on April 17t (Exhibit B).
4. Storm water manhole placed at incorrect grade at Mazguerite Street STA 3+40.
5. Additional work:
a. 1-site visit
b. Submittal approval
6. Timeline for STRM MH at STA 3+40:
a. April 6`h made a site visit to project to look at subject manhole. Manhole
was place at correct flow line however rim of manhole was constructed
approximately 18" above grade shown on plans. HDR requested that the
Contractor provide a sketch showing their method to repair the manhole.
b. July 1 S` HDR received sketch (Exhibit C) and approved the submittal on
July 7`h with "no exception taken".
Attachment 1
ROJE(~TION
ERTY LINE
• 5~1
-,
__.. - . .
_ _.
_: --.-
-- -
~cr .. ._.
...
.~--,
>~ E- Move ~' ............. S
4'
/~1~,
``_+_ l ~
1~ 4 f
r~~
1 '~ i
~~ ~:~
TAN f-IQUSE
r ; ..,
`~.1 ';
i•-: f~
'' I ~g~o~
I` _,•i
~~ ~~,
GREEIJ AND
WHITE: I-(OUSE:
~ •• ~ ,
~'
i
~;
--
~ / :I
~•~~ I /
i
Two.-sTORY
HOU~EII
i _...~•1
!~6 c.-e. S~vI~G aJivcf~~ ~/<st~'e t w~ wi ll nc~ vKa~,~L' ~"S-~E dcr«~t ~v,l~~-
b~ wi ll ~~.u,..k_ -!'~^~ ~ct.~e~,x....~ t-i- o-~ ~x.i5•{i.hc1 c~c~so .~ dnvet„~u...(~,
'r~~ will btt c. c~.,~t.G4.4 i,.:~~~-t •r4t `ccv~w r.~.~ ~lcte5 c~,..cl ~~i(e.~ •
We. ca,.,R. ~C- a-yr~~ -1L~~ coo, ~ra~~~uC k,-tl wioJi~ ~'lu~eg kt,rr bn,,:~
-{'~x~ tc,.~y~-c
C~rGu~(Qv~ O~~ ncc.~rv•~iC1c~a-'~~
y~ SgC¢~t, 1.~;`~
J -K-e- ~cn,~w Ott\.w~ W~~le keN~~.u~ to
~G y~
2~~ ~' Y3'1o(•{V~ v+n~.-tc~-' l~lOtQ
Altachmen[1
F.xhibitA
I SHEET ~,-ol Z .
SHINER MOSELEY
~
~ CLIENT/PROD.
~~^' CG PROJ.NO. REF.
i3~
I
...
1 iJ~ ~ AND ASSOCIATES INC. susJ.
~~ s~ .~- ~ ev DATE /~ ~
~
Ltp t
555 N. Ca2nCahua, Sui[e 1650 • Corpus Christi, Texas 7tl478
2111 • Pax
1361) 857-77
34
l
361
857 COMM. )p '~.,7. ~{' -
~ rJ'~j/
f-
a ~~~~$/^'l CHECK DATE
:
.
Te
: (
)
- ~,
~
(C
~7p{oS-~A (o RATE-/~'(2 /{-M~.
1- GO-
tuE ~ ~ ` ' ? ~ /B'
~E i /t ~ L : ~ 71. ~ I 5~~~'
N.T. S . /~
1 .G.(L~~
o pq,4'TcH ~f+oP
g,6~tu. a~ G~~z ~ ~rGC'r
~ lv
GA-r~~+ r~~t sl/v r~c.4~1
Attachment 1
Exhibit B
f
SHEET _~ of
SHINER MOSELEY CLIENT/PROJ. f _7' ~ ~
lV~ ~~•~~~117 PROD. NO. ~ I ~J REF.
AND ASSOCIATES, INC. susJ. ~1,
~..~.~,~
~
~ 1~,y~
/~Y~7
~ ar / _I oarE l~" ,.1 0~
555 N. Carancahua, Suilc 1650 • Coypus Clu'isti, Tezas 78478
Tel: (361) 857-LYI I • Fax: (36q 857-723h /
^
`'
COMM. aa,.~~. ~ yr, /
~
I,y
Ic / ` ~ ~ l., ~ CHECK DATE
.~
~~,~,t(7)~"~~~f.
-- -. _ ~ _ _
- -_.
-~ .- _
~12oPn ~~
/ ~
j~yfvE. w.~Y ~~
~b~ r
j -r ~ ~ ~ i c_r_ c %~~_c_~ , ~r
!,~ ~~IZ
~ /~'
/ _ .; ___... .R.
I;.~R.T'1 1(„S
-~o~/ A~~__~._.
~r~,~, ,~~~srz.x,•.•r~ ~.iN7T
rte` n~,r>~s.colC+~„~)
(°IZb Y'95.ED fdi~Qi (NG'G..°/'
Attachment l
Exhibit B
Jul O1 OB 11:31e
finished
.._.~-..
2" clearance to bottom bar
# 4 amootlt
eP.~~rp{
Existing
_I ..._ .. .. ..
' ~ ~ CROSS SECTION
~IDEXCEPTIONTAXEN O Otff~pRECT10NS
^ REJECTED ^ REV16E AND RESUBMIT
Checking Is for general cordmmanre with the design
concept of the pro~act and general compliance with the
comract documents. Contractor shah h2 responsl6le for
dimensions antl quanUlies, tochnlques or construction,
coonlmatlon of his work with That of other trades, and the
satislaclory porlormance of the work,
HDR ENGIN~ElEAR~ING~,/INC
., _._ 7/'9/8 a.,/ \ /
-r-
~:~ ~
PLAN VIEW
Raised Ring and Cover
STORM WATER MANHOLE
STA. 3+40
P-~
MChor t0 concrete vrith anchor Dogs
.'p: A~
-10" {min) concrete slab
etp ° ~ ~ class "A"concrete
U ft x 8 ft concrete slab
* 4 rebar (top and bottom)
B ft x e ft concrete slab
Attachment l
Exhibit C
Attachment 2:
Summary of Additional Work related to sanitary sewer manhole at STA 4+00 in
Marguerite Street:
1. Additional work:
a. 3-site visits
b. Submittal approval
2. Timeline for CI B-6:
a. Unknown: Contractor installed sanitary sewer manhole in incorrect
location at intersection of Marguerite and 18a' Street. Contractor installed
the manhole along the curb line of the street within the extents of the
gutter. Plans show on Sheet 26 that the proposed manhole is to be
constructed 8' west of the centerline of the street.
b. March: Construction Services requested HDR to meet at project site to
look at possible courses of action. HDR requested that the contractor
provide a sketch of how he was going to fix/ remove/ or relocate the
manhole.
c. April: Numerous adjustment methods were discussed over the phone.
Additional site visits were made to look at courses of action.
d. Apri124`h: HDR received letter and sketch (Exhibit A) from Salinas
Construction on a method of adjusting the manhole. HDR concurred with
course of action to move the upper portion of the manhole in order to
move the top away from the gutter line.
Attachment 2
May 22 08 09:1Sa
•.ti ~^' .~
~.• ~: i~ ~~ \ .~..:.~.r:S ':..~CYS~r"::...:' :.. .. eC~+.?:1CLC:5.LJ, ....
April 24, 2008
HDR/Shiner and Mos ey and Associates, lnc. ! ,
Attn: Mr. Scott M. arris, P.E. r, ~a ~ -1-7 SG r r? ~ ;''
555 N. Caren Ste 1650
Corpus Chri ', Texas 78469
Re: Garcia Arts Education Center
Area Street Lnprovements
Project No.6133/6134
Dear Mr. Hams:
P.t
Attached for your review is a revised method of adjusting the sanitary sewer manhole at
centerline station 4 + 00 on 18e1 Street on the above referenced project. We propose to
excavate the manhole and move the bottom towards the center of the street. 11re sewer
line would then enter the manhole off-center but still be accessible through the manhole.
This would allow us to move the top away from the area where the present slope ptobiem
is occurring.
Attached is a sketch of the proposed modification. Please call me at 210-265-7606 or
Mr. Bart Stevens at 210-334-7399 if additional information is nceded.
Smcer~l , l/~/~`
Robert Rodriguez, P.E.
Office Engineer
Attachment 2
Exhibit A
May 22 08 09:i5a
GARCIA ARTS CENTER AREA
STREET IMPROVEMENTS
p.2
gxisting location of u-anhole
~ ^" ~ I`
~ \
10° rawer line ~ 6 \`
Proposed relocation of manhole
~, _
PROPOSED MODIFICATION
MANHOLE STA. 4+00
Attachment 2
Exhibit A
Attachment 3:
Summary of Work related to an additional driveway along 17`h Street:
1. Additional work:
a. 1-site visit
Z. Timeline for additional driveway:
a. June 6, 2008: Construction Services sent email to HDR about complaint
regarding driveways along 17a' Street for Mattress Firm (Exhibit A).
b. June 9, 2008: Construction Services sent email to HDR requesting to
verify location of additional driveway with Omar Garza. Made a site visit
to verify location (Exhibit B).
Attachment 3
Harris, Scott
From: Marty Schmitt [MartyS@cctexas.com]
Sent: Friday, June 06, 2008 3:24 PM
To: Harris, Scott
Cc: Kenneth Kaper; Omar Garza
Subject: Garcia Arts Project
Attachments: 17th Driveways.pdf
17th Drlveways.pdf
(480 KB)
Scott,
We have a complaint regarding driveways:
Please see the attached photos - The back parking lot of the mattress firm had two
existing access driveways, one for truck deliveries and second for trash dumpsters.
Is there a reason why two were not installed?
Thanks
Thanks,
Marty Schmitt
361-850-0823
Attachment 3
Exhibit A
Exhibit A
Harris, Scott
From: Marty Schmitt [MartyS@cctexas.comj
Sent: Monday, June 09, 2008 3:06 PM
To: barts77@yahoo.com
Cc: Kenneth Kaper; Omar Garza; Harris, Scott
Subject: Garcia Arts Center
This E-mail is for notifiacation to add an additional 15 foot driveway at the Mattress
Mark dumpster driveway.
Verify location with Omar Garza.
Thanks,
Marty Schmitt
361-850-0823
1
Attachment 3
Exhibit B
Attachment 4:
Summary of Additional Work related to Marguerite Neighborhood Center Building:
1. Additional work:
a. 2-site visits
b. Exhibit development for Change Order 4.
2. Timeline for neighborhood center issues:
a. February 28, 2008: HDR met with Jesus Leija, Architect for the proposed
Marguerite Neighborhood Center to discuss utility locations and driveway
locations for the proposed building. These locations were required and
requested multiple times for the street improvement project prior to
construction (Exhibit A).
b. March 2008: HDR made a site visit to ensure proposed locations of
driveways and utilities would fit within the proposed plan for street
improvements.
c. March 2008: HDR developed exhibit (Exhibit B) to be included in Change
Order 4 that included driveway and utility locations for the proposed
building.
d. May 2008: HDR made a site visit to verify that the Contractor constructed
the driveways in the correct locations.
Attachment 4
~.3~
~~
Neighboz)-ood Cenbe~ of Ccapus c~ri, hoc.
614 Home Road
Capus Christi, Taxes 78416
Rei: IYfAR(iUBRl1E NBI~IIBORHOOD CII~IIERBIIII.DIN(3
Naighbo~ood Cmtas of Cow
~ Clgisti, Tales
Dabs: February 28, 2008
Dear Mr: l~u;
- ~?~:
This morning I mdwiW Cad E. Cmell who iswith HDRF~maariog, Ina.. HDR
Engureaing is the eagioearog firm admimstoelog the sti+aet impr+ovamemts around the
t3arcia C~ whiff is the same oomplag of the rafm~eoced 1b building.
Three streets nmttely, Margaeribel8m and 17a' 3hects are presently being impreved
and scLadaled bo be provided with new searca and wader lines as wdl as new cmb, gutter
and saphah paving. The refirrmcod bo projoct is bo be hx~od at the comer of 18'~ and
Marguerite 3heetii and shall needtwo wh~absll beinrdadedeapaRafthe
presort sheet ia~rov.
A. Front aotiaoce to the site ofthe refxamoed ~l be a lrwmty Foot (20')
appmeah Five £oet (5') from naaW property Iine on 18° Steaot
B. Rear eaheaix to the site shall be a Tweedy Foot (?A') approach stinting
Thirty Bight Fact (38'~ fmm west pmpeaty lino on Marguerite sfroat
The antimoes are oamishaR with Bye p~Y site phm puovIded to your offioo.Note
that itmay 6e netr to appesr beliore the City Bm'ldmg Board of AdjostnxmR for the
purpose ofregoeating avadsnce.
Please call me at anytime, should you have questia~non this matter prior m our next
,.
A.
Xc: Mr Carl Q CmII, P.E.
Mr. Damal Gallegos
-1 South Tancahuo
Mpus Christi, Texoa 78AO1-3429
81) 883 4348
Iew uwlwiLMr.t __~_~ ~ . _a
8723 Botts 1.6na
Sae Mtonio, Texas
(ato) 4os 2067
Attachment
ExhibitA
78217-6334
/
/ '
~~ j ~ ,,.,,..\,,\ 11! ~
„
/ / _
~ ~~
%
~ f~ j ~
` ~ / /
//
/
`
r ~[ ~: _ -_-
/~i~* . `.~
-
,~
f
J/ i PRO
/ DEVELO
/ / {//
` ~ m
'µ~ . o
y o
/
1~/
/B~{
/ ll
/ ~ O~ nn ~
M m
~
~
/
i /
/ j '~ ~ ~
S
d
/1
/
f f
~ ~{
~ ~
~ $ Z
~ "~
/ J
% / ~ / ~ Ir~
1~1 2
/ ~ ,f
J
~ N
~ U
~
%
~
2
~
J
~
/ ~
c
U ~
j m
i /
~
/
'j ~
~ ~ / 1
/ I~ III aQ a
~Ih~ p W w`
V ~ o
//
5• ;
f 4.
o
~' Y
~
20' PAD o
v m°
0
~
F'
3~ ~
W
~ ~~_,
~ .+
5D
2 UW
w WW
.
I z
~~ W
~Utu
BTH ST Q ~ W !'
Z
E Q~ O~~
g
tl W~ ~~~
W
~ W
~
Q~ U~3
Q~ ~~
U UF
~
Q O
TlE 1 " WTR SERVICE ~ ~
INTO PROPOSED 6° WTR
SHEET 01 0l 02
CHANGE ORD~ = STR 782
Attachment 4 ~ em veaECr / 6133 4
Exhibit B
Attachment 5:
Summary of Additional Work related to incorrect placing of reinforcing steel in the curb
and gutter construction:
1. Additional work:
a. 3-site visits
b. Review/ clarification of plans and specifications
2. Timeline for Curb & Gutter issue:
a. Unknown: Contractor began using acurb-laying machine to install curb &
gutter along proposed street improvements.
b. April: Construction Services contacted HDR (Reference Exhibit A) to
make a site visit for the purposes of inspecting the steel within the several
sections of curb & gutter.
c. April: HDR reviewed plan curb & gutter details and made three separate
site visits to verify and inspect the incorrect placement of reinforcing steel
in curbs along 17~h Street, 18u' Street, and Marguerite Street.
Attachment 5
Harris, Scott
From: Marty Schmitt [Marlys@cctexas.com]
Sent: Tuesday, Apri108, 2008 2:35 PM
To: Harris, Scott
Cc: Kenneth Kaper; Omar Garza
Subject: RE: Garcia Arts Project
Thank you Sir
Thanks,
Marty Schmitt
361-850-0823
»> "Harris, Scott" <Scott.Harris@hdrinc.com> 4/8/2008 2:11 PM »>
Marty,
Several sections of curb & gutter do not meet the plans' standard details. I recommend
that the contractor remove and replace any curb and gutter that does not meet the spacing
requirements as shown in the 6" Curb & Gutter Detail on Sheet 19 of 97 (City of CC
Standard Street Details). Basically, the detail shows three inches of cover. This can
vary +/- 1" but still cannot be within 1" of the surface.
Scott
-----Original Message-----
From: Marty Schmitt [mailto:MartyS@cctexas.com]
Sent: Tuesday, April O8, 2008 2:00 PM
To: Harris, Scott
Cc: Kenneth Kaper; Omar Garza
Subject: Garcia Arts Project
Scott,
Please provide City with your recommendation regarding the Curb and Gutter design and/or
relieve that would be allowed fo the curb and gutter in place.
Thanks,
Marty Schmitt
361-850-0823
i Attachments
Exhibit A
Attachment 6:
Summary of Additional Work related to the AEP poles interfering with construction:
1. Additional work:
a. 2-site visits
b. Formal letter to City Construction Services addressing issue
c. Meeting with Construction Services to address approach/response
2. Timeline for AEP poles issue:
a. October 30, 2007: AEP poles were addressed at pre-construction meeting.
b. November: HDR provided AEP with set of plans with proposed locations
of utility poles.
c. January 3, 2008: Salinas Construction writes a letter to HDR addressing
that AEP poles have not been removed. HDR makes initial site visit.
d. January 3, 2008: HDR forwarded letter to Construction Services to
address.
e. January 11, 2008: Construction Services denied time extension for the
AEP poles conflict.
£ March 7, 2008: Salinas Construction sends letter to HDR (Exhibit A)
stating that they are still experiencing delays due to the AEP poles
interfering with construction. HDR makes a second site visit and sends
email to Construction services stating that some time should be authorized
to the contractor. 30 additional days are authorized on Change Order.
g. March-May: Salinas Construction requests additional time (above 30
days) and compensation for AEP poles delay.
h. May 9, 2008: Ken Kaper asks HDR (Exhibit B) to meet to discuss all of
Salinas' claims, primarily the AEP poles delay.
i. May 15a' HDR meets with Construction Services to develop approach and
response to Salinas' claims.
j. May: HDR sends letter to Construction Services addressing time delays
due to AEP poles and recommends 30 days additional, as first stated in
Change Order.
Attachment 6
SALINAS CONSTRUCTION TECHNOLOGIES, LTD.
3734 F.M. 3008 • PLEASANTON, TEXAS 78084
PHONE (830) 281.3500
FAX (830)281-3502
~•~°`~~~
c... .. .._ _ :~i~
HDR/Shiner and Moseley and Associates, Inc.
Attn: Mr. Scott M. Harris, P.E.
555 N. Cazancahua
Corpus Christi, Texas 78469
Re: Gazcia Arts Education Center
Area Street Improvements
Project No. 6133/6134
Dear Mr. Harris:
This project continues to experience delays due to the AEP poles interfering with our
proposed construction. This matter was addressed during the pre-construction meeting
on ~e and in our letter of 0!~ To date, the poles remain and
the project is at a standstill.
The City's response by Mr. Kent Power o denied a time extension based on
contract drawings Sheet 03 of 47, notes # 1 and #4. A careful review of these notes, the
contract documents and the construction plans, does not indicate that relocation of these
poles is in anyway the responsibility of the contractor. The City, by issuing the order to
proceed, and as owner of the street right of way and of the construction project, has the
responsibility to adjust or cause to be adjusted by the utility owners, any utilities or other
obstructions which may.interfere with the proposed construction contract. This is a
governmental responsibility which the City controls thru its permit policy, right of way
rules and related ordinances and cannot be delegated to the contractor.
As soon as the poles are removed and we can continue with meaningful progress on the
project, we will submit a revised construction schedule detailing the project delays.
Any assistance you can provide to have these poles relocated will be appreciated. Please
call me at 210-265-7606 if additional information is needed.
Sincerely,
~~ t
Robert Rodriguez, P.E.
Manager
Attachment 6
Exhibit A
Harris, Scott
From: Kenneth Kaper [KennethK@cctexas.com]
Sent: tAled yQ&E~ 5:08 PM
To: Harris, Scott
Subject: RE: Garcia Arts
Scott:
Sorry - I have been busy and couldn't meet today - how about tomorrow.
Let me know at what time - my schedule is wide open.
Thanks,
Ken
»> "Harris, Scott" <Scott.Harris@hdrinc.com> 5/13/2008 8:10 AM »>
Ken,
I can meet you tomorrow afternoon to discuss this. Please send me the time that
best suits you. I will have our response to the AEP poles issues ready at that time.
SCOtt
-----Original Message-----
From: Kenneth Kaper [mailto:KennethK@cctexas.com]
Sent: Friday, 9:90 PM
To: Harris, Scott
Cc: Jerry Shoemaker; Marty Schmitt; Crull, Carl; Fudge, Natasha
Subject: Garcia Arts
Scott:
Jerry Shoemaker has suggested we (Construction Services and HDR) develop a response to the
AEP pole issues that incorporates Salinas'
inefficiencies, defective work, lack of supervision, lack of production etc. as the method
to deny the monetary damage issue. Ultimately we will need to come to some agreement on
the time extension.
Marty, Omar and I are available to meet and discuss this response.
Please contact me to set up a meeting next week.
Thanks,
Ken
t Attachment 6
Exhibit B
Attachment 7:
Summary of Additional Work related to the conflicts with sidewalk ramps, sidewalk
extensions, and ADA compliance:
1. Additional work:
a. 2-site visits
b. Additional design/ sketches of ramp modifications and sidewalk extension
2. Timeline for sidewalk ramps:
a. May 12, 2008: HDR received email (Exhibit A) from Construction
Services requestin~to look at proposed sidewalk ramps at 17"' Street and
Marguerite and 18` Street and Marguerite.
b. May 13, 2008: HDR made a site visit to look at the intersections. AEP
poles, both existing and new, were installed in areas that conflict with
placement of ADA ramps.
c. June 5, 2008: HDR received email from Marty Schmitt (Exhibit B) stating
that sidewalks and curb ramps at 18"' Street and Agnes Street needed to be
addressed as well. HDR made a second site visit to look at subject
intersection.
d. June 6, 2008: HDR submitted sketches (Exhibit C) for "modified' curb
ramps at the locations referenced in "a" above.
e. July 7, 2008: HDR submitted sketch (Exhibit D) of sidewalk extension
and curb ramp at 18`h Street and Agnes.
Attachment 7
Harris, Scott
From: Mark Guerra [markjg@cctexas.comj
Sent: Monday, May 12, 2008 4:52 PM
To: Harris, Scott
Cc: Marty Schmitt; Omar Garza
Subject: Garcia Arts
Scott,
I filled in for Omar 5-12-08, the contractor needs some clarification on ramps on sheet 6
of 97 at the intersection on 17 th and Marguerite there are 3 type 22 ramps and 1 type 7
at the same intersection on sheet 10 of 47 it shows 2 type 22 and 2 type 7, when you come
up with a solution can you please inform Omar Garza so he can let the contractor know how
to proceed.
Thank's Mark Guerra
1
Attachment 7
Exhibit A
Harris, Scott
From: Marty Schmitt [Marlys@cctexas.comj
Sent: Thursday, June 05, 2008 9:23 AM
To: Harris, Scott
Cc: Gerald Tyler; Kenneth Kaper; Omar Garza
Subject: Garcia Arts Project ADA ramps
Scott,
Please also see sheet 6 of the construction drawings, 18th and Agnes has some ADA issues
as well.
1. The east side shows the sidewalk stopping and going into the street with no ramp.
2. The west side shows the sidewalk stopping with it not continuing to the corner.
Our suggestion is to continue the sidewalks to the corner of Agnes with appropriate curb
ramps.
Please see if you can accommodate into your release o£ the other sketches.
Thanks,
Marty Schmitt
361-850-0823
t Attachment 7
Exhibit B
SHEET (~ oi~
L~ SHINER CLIENT/PROD. PROJ. NO. e , ~ Y REF
r1J.~ MOSELEY 5~~,.. Vt ( ~ t' ~ ,
•"-'r. ~ d.Y ~ IBC YY!%•"'r, aY s t~ DATE ~j Lj O
555 N. Carancahua, Sul[e 1650 • Coryus ChdaN, Texa9 78478
Tel: (361J 857-2211 • Fax: (361) 857-7234 COMM. CHECK DATE .P
~~ ~ ~ ~ V
i.
i~+
63
g
.y4 i °~
~ -. ~~ (d ~ ICJ rY.~n
'1:
.5 .-- GEVEI. 4h.IDINU /h'IJt./'.
5-~.~ MhX Z~ lLpl'~. ~.v i9aa- 171'R-6.[-TK~a/4-S•
I r
~` 5 a ,1
(
.I.'j g -,
~~~ -,.
;; ~p~-~
u
,~ o
i ~ ~''
_ 0!''~~ N'~ ~ I 8.39' ~ { ,
a•
Qjltrsfil/C,GD4AE, Mwu n
[,ELF-L ati I~,~uvG .... 4- ! s~ _a
14,-uA , M.}X Z~ ~
/.v ALL /7iRCC+fia+-•S.
11~ ~~
~~t'3-'! 4' I~ L+~ Cc* i!'G. 51~ 1,_ R~TM ~..k ~~w 1 ~ I~
No~~ Gibs SGo+~ icu~~rJ e~Ge~•+`-
~~ o.v.~„y ~D~°'~Fc~l eF rrt~ ~,.I:fu..,,~r
~-.M ~/ a 2 'TnrnSlTi ~ to S~Ta.-cy
Attachment 7
Exhibit C
SHEET ~ of
SHINER CLIEM/PPOJ. ~.~ ~~~,A ~1.~,.~~ PHOJ.NO. 'rt .~ ,i~ HEF
PlJ
~~ MOSELEY gpg,l„ ~° 1~~ DATE / /y
BY
555 N. Caran[ahua, SW[e 1650 • Corpus Christl, Texas 78478 COMM. CHECK ~~J,y DATE ~ ~ v~
Tel: (35t) 857-2211 • Fax: (361) 857-7234
~-~~E• o F-~~
fc ~-r`r~..k-
`({ Nb
l
n I
`
r
~~
i ~
/
.~ Cc!HC--t~'r 1:'e..l~
( ~a~-fo~~Ir
~o~ -- -
I ~ (%7eore. of tpe4e t'o 4' ~•4 - ..
i
,, "° G-OIJ~a wrblt rJ
- w^r_K1_ ~
~ ntJ
~,
_ _
~ °~
s~--
~
IV~ARGVBfeFr~f~.
-sT~~^ ~n7ce
~
~ T
~.r r•~.e.-r
11 ~a
Md~ 1 ~ a~~ (.~.-~. ~_~~~srttl u.
No 7E: GPasc- s~o'E tio'r ro F.><c.e~a Zl
pNA~ne'y ~'!2-°Rw+ dF'Pt#~.."~tS;'~"MB>.•VL.
Attachment 7
Exhibit C
~T~~ SHINER CLIENT,
l iJ.~ MOSELEY suet..
555 N. Carancahua, SuI[e 1650 • Corpus Chris[i, Texas 78978 COMM.
Tel: (361) 857-2211 • Fax: (361) 857-7239
1
N
1~
~1~
.~ ~~
o ~~
a
~~r~e
~~~`~
~~
~~~~ ~~~
G~-
6
~~~~
~~1+~O~Ou
SNEEf
PRQI. NO. / /33 ~ REF
eY ~ 1( DATE /
CHECK A Jrrr'm - DATE (~o~
~`~ I
~.. __. _- Tire. i N?v f-. %r:.'l'.A1(a \A1/It_L! .
tr- lD r--e-.! i.L
-~~~
t _.__..._. _-_ __.__.._-..__
_ _~ _ _
'L-~y~r.~..~ ~1~.
~If-,~.~ ~~:,~ T~~~ ~~,.:-~~.t 11...G~
Attachment 7
Exhibit C
~ CURVE
~-
rr^^
v2
PROPOSED UNTIED
SIDEWALK
STA. 0+85
BEGIN CONSTRUCTION
MATCH EXISTING PAVEMENT
NORTHING = 17032567.29
FASTING = 2521558.91
-T.O:C.-36.47
~~ h a
~ T O.C.-36.59 i ~
4' p•
-~- ~
~~ ~
~~ ° - -~
O ~
~O I
Q' N O
J ~
O
3 0+50
0 5~
tY
J N +.
~ ~~~ TOC G° ~~
s
~~' p --~~O--=EXIS NG ROW --
~s c ,~ --
d- ~-T
s sy
C1
PI STATIC
DELTA
DEGREE
TANGENT
LENGTH
RADIUS
PC STATI
PT STATI
P
8 13
PROPOSED
ROW
T
O
5' 16' c a~ ~ ~ .
'--~~~- '~O t0
TO - _ _-- ~-{'
e ..
~~J ~
'9R C
STA 1 +50 t
~ 37.00
_~- 1+50
1+00
~ STA i+oo 0 33'
36.84 ~.~
o 5' ,
} ; .CONS. SIDEWPIK o .
~ 1.
~v
a .. ~~.
~ ~ -- -_
---___~~~--- -- 10, --------~
~~ ~-T.O.C. ~ 36.53 / ,,+~ }'~'L.~1
Attachment?
Exhibit D
Attachment 8:
Summary of Additional Work related to alternative sidewalk drain:
1. Additional work:
a. Additional design/ sketches of alternative sidewalk drain
2. Timeline for sidewalk ramps:
a. June 2, 2008: HDR received email (Exhibit A) from Construction Services
requesting to provide a sketch of an alternative sidewalk drain stating that
the City did not want the Contractor to install the standard drain as
detailed in the approved plans and specifications.
b. June 2, 2008: HDR submitted sketches for an alternative sidewalk drain
(Exhibit B).
Attachment 8
Harris, Scott
From: Kenneth Kaper [KennethK@cctexas.com]
Sent: Monday, June 02, 2008 5:28 PM
To: Harris, Scott
Cc: Marty Schmitt
Subject: RE: Garcia Arts Alternative Sidewalk Drain Sketch
Scott - We need this ASAP - first thing in the morning - copy Marty as I have early
meetings.
Thanks,
Ken
»> "Harris, Scott" <Scott.Harris@hdrinc.com> 6/2/2008 3:12 PM »>
From: Harris, Scott
Sent: Monday, June 02, 2008 3:12 PM
To: 'Kenneth Kaper'
Subject: Garcia Arts Alternative Sidewalk Drain Sketch
Ken,
Attached is a sketch of an alternative sidewalk drain. I
scratched
out some dimensions and changed them to apply to the planned
sidewalks.
Please have the contractor submit cut sheets/vendor data on the steel
grating. The sketch shows 3/8" thick grating but this is not critical
for non-traffic sidewalks.
Scott
t Attachment 8
Exhibit A
SHEET~oI Z
`~ SHINER
~
~ CLIENT/PflQI. G`' .A 1 S
C PflQI. NO. i3~ ~ 3 EF
..
,
1 L. ~ MOSELEY g~g~ /
/ L 17,E/ltAJ BV DATE
b 2 ~~
555 N. Carancahua, Sultc 1650 • Coryus Chdsli, Texas 78478 COMM. CHECK DATE 6
N ~
Tel: (361) 857-2211 • Fax: (361) 857-7234 •
m
~_r__.
_.--
N
~~
.~ V1
r> " y/0 G~l~Grc~n..~~ F}dT f~(P
T, Z
~ • 1 iE 17 ~r~,r,.ihr.K
/~ N.r.S.
.,~_ ~ ~_
~- 3g"GHF~Y-ERF..~ NdT~tP
~hW. Sv'FkG Zh"~E.
(2)
„ G$ ~
.lip l/F_ n ~~,Dr we-Ll~-
~? 1. j
Attachment 8
Exhibit B
SHEET Z 01~
LL~~ SHINER CLIENT/PROJ. ~. f 4 ~a= FFOJ. NO_ 3 (S AEF
i l_!-~ MOSELEY SDe,I.. ~ ~ aY ~.n DATE ,h z o4f
555 N. CaraeCahua, Sulte 1650 • COfPuS Ch[Istl, Texas 76978 COMM. CHECK ~~. DATE 6 G O,Q
vv
Tel: (361) 857-2211 • Fax: (361) 857-7239
~~
O
Fy
(,J
_ ~V ~~ N
/ 6 ~G~R~ 7a ~~ GUT
I l ~~ ,STi~.'~'L^7~ ~ .
~,~
Fu^>v --~
YoATtwiN 'I'
v ~-I
~P eF ~ 12 0. o.
b.~,r. e ,"~d . d~P+~+
mil!== _____--
v!~ ~ ~ _ pl
:P;P ,~
/ <`~, \ ..
i
/ ~ FIC~,e 3~sre.~-r~fr~
A/T.S.
$~~e~ 5 i EEL PLATE To
Go N ~ ~ 6 ~sw.cv ~5PncED taQATm~
„v~~k'~eP Z~ ~+tLaV(~ Gub/TTGp.+~ihK
n ( ~. _..- __.. __'-r -_...A
6 ~{t
s" ~-
~(9R ~~/T~ /Oi.~
`T~~ A/.'r S .
S~SX>1/nl 1~
p~G~ORtitla_G
To vWtT~rl
GoA/5 f'f~~/v~^
t~f~Ft~ 5.
Attachment 8
Exhibit B
City of
COI'pUS CITY OF CORPUS CHRISTI
CilriStl DISCLOSURE OF INTERESTS
~~~
City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City
to provide the following information. Every question must be answered. If the question is not applicable, answer with
"N/A".
FIRM NAME:- HDR-Shiner Moseley & Associates Inc
STREET: 555 N. Carancahua. Suite 1650 CITY: Corous Christi ZIP: 78478-0010
FIRM is: 1. Corporation X 2. Partnership- 3. Sole Owner- 4. Association-
s. Other
DISCLOSURE QUESTIONS
If additional space is necessary, please use the reverse side of this page or attach separate sheet.
1. State the names of each employee of the City of Corpus Christi having an ownership interest constituting
3% or more of the ownership in the above named firm.
Name Job Title and City Department (if known)
N/A
2. State the names of each official of the City of Corpus Christi having an ownership interest constituting 3%
or more of the ownership in the above named firm.
Name Title
N/A
3. State the names of each board member of the City of Corpus Christi having an ownership interest
constituting 3% or more of the ownership in the above named firm.
Name Board, Commission or Committee
N/A
4. State the names of each employee or officer of a consultant for the City of Corpus Christi who worked on
any matter related to the subject of this contract and has an ownership interest constituting 3% or more of
the ownership in the above named firm.
Name Consultant
N/A
CERTIFICATE
I certify that all information provided is true and correct as of the date of this statement, that I have not knowingly
withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the
City of Corpus Christi, Texas as changes occur.
Certifying Person: Carl E. Crull. P.E. _ Title: Vice President
Signature of Certifying Person: -~~+~1 %i~~'r' % Date: ~~wFf
EXHIBIT "B"
Page 1 of 2
DEFINITIONS
a. Board Member. A member of any board, commission or committee appointed by the City Council of the City of
Corpus Christi, Texas.
b. Employee. Any person employed by the City of Corpus Christi, Texas, either on a full or part time basis, but not as
an independent contractor.
c. Firm. Any entity operated for economic gain, whether professional, industrial or commercial and whether
established to produce or deal with a product or service, including but not limited to, entities operated, in the form
of sole proprietorship, as self-employed person, partnership corporation, joint stock company, joint venture,
receivership or trust and entities which, for purposes of taxation, are treated as non-profit organizations.
d. Official. The Mayor, members of the City Council, City Manager Depu~City Manager, Assistant City Managers,
Department and Division Heads and Municipal Court Judges of the Ci of Corpus Christi, Texas.
e. Ownership Interest. Legal or equitable interest, whether actually or constructively held, in a firm, including when
such interest is held through an agent, trust, estate or holding entity. Constructively held refers to holding or
control established through voting trusts, proxies or special terms of venture or partnership agreements.
f. Consultant. Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the
purpose of professional consultation and recommendation.
EXHIBIT "B"
Page 2 of 2