C2016-606 - 12/20/2016 - Approved
2016-606 12/20/16 • M2016-168 • American Process Group,Inc. 00 52 23 AGREEMENT This Agreement,for the Project awarded on December 20, 2016, is between the City of Corpus Christi (Owner)and American Process Group, Inc. (Contractor). Owner and Contractor agree as follows: ARTICLE 1—WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as: O.N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 City Project No. E16246 ARTICLE 2—DESIGNER AND OWNER'S AUTHORIZED REPRESENTATIVE 2.01 The Project has been designed by: LNV, Inc. 801 Navigation Blvd.,Suite 300 Corpus Christi,Texas,78408 2.02 The Owner's Authorized Representative for this Project is: Wayne Otto, P.E.—Acting Construction Engineer City of Corpus Christi—Engineering Services 4917 Holly Rd.,#5 Corpus Christi,TX 78411 ARTICLE 3—CONTRACT TIMES 3.01 Contract Times A. The Work is required to be substantially completed within 365 days after the date when the Contract Times commence to run as provided in the Notice to Proceed and is to be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 395 days after the date when the Contract Times commence to run. B. Milestones,and the dates for completion of each,are as defined in SECTION 01 35 00 SPECIAL PROCEDUBES. 3.02 Liquidated Damages A. Owner and Contractor recognize that time limits for specified Milestones,Substantial Completion, and completion and readiness for Final Payment as stated in the Contract Documents are of the essence of the Contract. Owner and Contractor recognize that the Owner will suffer financial loss if the Work is not completed within the times specified in Agreement 00 52 23-1 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1(Project No. E16246) Rev 06-22-2016 INDEXED 00 91 01 ADDENDUM NUMBER 3 Project: D.N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 Project Number: E16246 Owner: City of Corpus Christi City Engineer: J.H. Edmonds, P.E. r! Dvt Designer: LNV, Inc. Addendum No. 3 Specification Section: 009101 Issue Date: 11/23/2016 Acknowledge receipt of this Addendum in the Bid Acknowledgement form submitted for this Project. Failure to acknowledge receipt of this addendum in the Bid Acknowledgement Form may render the Bid as non-responsive and serve as the basis for rejecting the Bid. Make the additions, modifications or deletions to the Contract Documents described in this Addendum. Approved by: LNV, Inc. Marcus J. Naiser, P.E. 11/23/2016 Name Dote Addendum Items: 1. Revised Sections 00 2113 INVITATION TO BID AND INSTRUCTIONS TO BIDDERS to reflect proper day of the week for Bid date. Wednesday, November 30, 2016 (Attachment#1). 2. Revised 00 30 00 BID ACKNOWLEDGMENT FORM toOF �1 reflect proper day of the week for Bid date. Wednesday. �:•¢491 November 30, 2016(Attachment#2). �� i *�� 3. Revised 00 30 01 BID FORM to reflect revised maximum Mobilization percentage(Attachment 93). MARCUS J.NAISER i....:...........................� 4. Revised Section 00 72 01 INSURANCE REQUIREMENTS to 9281 • r remove the requirement for Builders Risk Insurance � � (Attachment#4). �I',SS!(j...•- f��-� S. Revised Section 00 73 00 SUPPLEMENTARY CONDITIONS \� to replace working days and working hours stated in 00 72 00 GENERAL CONDITIONS(Attachment#5). 6. Revised Section 0129 01 MEASUREMENT AND BASIS FOR PAYMENT for maximum Mobilization percentage (Attachment#6). 7. Revised Section 0135 00 SPECIAL PROCEDURES to replace duplicate sections (Attachment#7). 8. Revised Section 46 76 11 Dredging, Dewatering and Hauling to modify requirements for project experience with Alum residuals(Attachment#8). 9. Clarifications to CivCast Questions(Attachment#9). ELN11, Inc. TBPE Frim No. F-366 Addendum No. 3 00 91 01-1 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1(Project No. E16246) Rev 01-13-2016 ARTICLE 1—BIDDING REQUIREMENTS 1.01 ACKNOWLEDGE ADDENDA A. Acknowledge receipt of this Addendum in the Bid Acknowledgement Form submitted for this Project. Failure to acknowledge receipt of this addendum in the Bid Acknowledgement Form may render the Bid as non-responsive and serve as the basis for rejecting the Bid. ARTICLE 2—MODIFICATIONS TO THE SPECIFICATIONS OR TECHNICAL SPECIFICATIONS. 2.01 ADD, DELETE OR REPLACE SPECIFICATION SECTIONS(OR TECHNICAL SPECIFICATIONS) A. REPLACE the following Specification Sections or Technical Specifications: Division Title Section Division 00 Procurement and Contracting Requirements 00 21 13 INVITATION TO BID AND INSTRUCTIONS TO BIDDERS(Attachment#1) 00 30 00 BID ACKNOWLEDGMENT FORM (Attachment#2) 00 30 01 BID FORM (Attachment#3) 00 72 01 INSURANCE REQUIREMENTS(Attachment#4). 00 73 00 SUPPLEMENTARY CONDITIONS(Attachment#S) 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT(Attachment#6) 013500 SPECIAL PROCEDURES(Attachment#7) Part T Technical Specifications 46 76 11 Dredging, Dewatering and Hauling(Attachment#8) ARTICLE 3—MODIFICATIONS TO THE DRAWINGS 3.01 ADD, REPLACE OR DELETE DRAWINGS A. NONE ARTICLE 4—CLARIFICATIONS 4.01 QUESTIONS A. Please see Attachment#9"E 15246 Intermediate Sludge Removal Phase 1 Q and A" REVISION 4 dated 11/23/2016. All questions and answers submitted since Addendum#2 was issued are shown in bold font. 4.02 CLARIFICATIONS A. NONE END OF ADDENDUM NO. 3 Addendum No. 3 009101-2 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 00 21 13 INVITATION TO BID AND INSTRUCTIONS TO BIDDERS ARTICLE 1—DEFINED TERMS 1.01 Terms used in this Invitation to Bid and Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. ARTICLE 2—GENERAL NOTICE 2.01 The City of Corpus Christi,Texas(Owner) is requesting Bids for the construction of the following Project: O.N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 Proiect No. E16246 A. The project generally consists of dredging, dewatering(as necessary), hauling and delivering to disposal site,water treatment plant residuals(sludge)from an existing storage lagoon. The residuals will be dredged from Lagoon No. 7(Washwater Return Basin) located on-site at O.N. Stevens Water Treatment Plant, 13101 Leopard Street, Corpus Christi,Texas(ONSWTP). The initial contract will be for a one (1)year(12- calendar months) and approximately$4M base contract with one(1) optional one(1) year(12-calendar months) renewal for an additional$4M based on Contractor's successful performance,approval by the City/Engineer and concurrence from the Contractor. 2.02 The Engineer's Opinion of Probable Construction Cost for the Project is$4.000.000 for the base contract and an additional$4,000,000 for the optional renewal. The Project (base contract) is to be substantially complete within 365 days. The optional renewal contract will be for an additional 365 days for substantial completion. The Project(s)(base contract and renewal)are to be complete and eligible for Final Payment 30 days after their respective dates for Substantial Completion. 2.03 Advertisement and bidding information for the Project can be found at the following website: www.CivCastUSA.com 2.04 Contract Documents may be downloaded or viewed free of charge at this website. This website will be updated periodically with Addenda, lists of interested parties, reports,or other information relevant to submitting a Bid for the Project. ARTICLE 3— DELIVERY AND OPENING OF BIDS 3.01 Bids must be received no later than Wednesday, November 30,2016 at 2:00 P.M.to be accepted. Bids received after this time will not be accepted. It is the sole responsibility of the Bidder to deliver the Bid,electronic or hard copy, by the specified deadline. Invitation to Bid and Instructions to Bidders ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#1 Phase 1(Project No. E16246) PAGE 1 OF 10 3.02 Complete and submit the Bid Form,the Bid Bond and the Bid Acknowledgement Form along with all required documents identified in the Bid Acknowledgement Form. 3.03 Electronic Bids may be submitted to the CivCast website at www.civcastusa.com. 3.04 If submitting a hard copy bid or bid security by cashier's check or money order, please address envelopes or packages: City of Corpus Christi City Secretary's Office City Hall Building, 1st Floor 1201 Leopard Street Corpus Christi,Texas 78401 Attention: City Secretary Bid-O.N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 Project No. E16246 All envelopes and packages(including FIE DEX envelopes) must clearly identify, on the OUTSIDE of the package,the project name and number and that bid documents are enclosed. 3.05 Bids will be publicly opened and read aloud at Wednesday, November 30, 2016 at 2:00 P.M,at the following location: City Hall Building— City of Corpus Christi First Floor City Council Staff Room or Council Chambers 1201 Leopard Street Corpus Christi,Texas 78401 3.05 The Owner will read aloud the names of the Bidders and the apparent Bid amounts shown on the Bid Summary for all Bids received in time to be considered. ARTICLE 4—PRE-BID CONFERENCE 4.01 A non-mandatory pre-bid conference for the Project was held on Wednesday November 2, 2016 at 10:00 A.M.at the following location: O.N.Stevens Water Treatment Plant Filter Building Second Floor 13101 Leopard Street Corpus Christi,Texas 78401 Invitation to Bid and Instructions to Bidders ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#1 Phase 1(Project No. E16246) PAGE 2 OF 10 ARTICLE 5—COPIES OF CONTRACT DOCUMENTS 5.01 Obtain a complete set of the Contract Documents as indicated in SECTION 00 52 23 AGREEMENT. 5.02 Use complete sets of Contract Documents in preparing Bids; Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete sets of Contract Documents. 5.013 OPT makes copies of Contract Documents available for the sole purpose of obtaining Bids for completion of the Project and does not confer a license or grant permission or authorization for any other use. ARTICLE 6—EXAMINATION OF CONTRACT DOCUMENTS 6.01 Before submitting a Bid: A. Examine and carefully study the Contract Documents, including any Addenda and related supplemental data. B. Become familiar with all federal, state, and local Laws and Regulations that may affect cost, progress,or the completion of Work. C. Carefully study and correlate the information available to the Bidder with the Contract Documents,Addenda,and the related supplemental data. D. Notify the OAR of all conflicts,errors, ambiguities,or discrepancies that the Bidder discovers in the Contract Documents,Addenda,and the related supplemental data. E. Determine that the Contract Documents,Addenda,and the related supplemental data are generally sufficient to indicate and convey understanding of all terms and conditions for completion of Work. 6.02 The submission of a Bid will constitute an incontrovertible representation by the Bidder that the Bidder has complied with every requirement of this Article 5,that without exception the Bid is premised upon completion of Work required by the Contract Documents,Addenda, and the related supplemental data,that the Bidder has given the OAR written notice of all conflicts, errors, ambiguities, and discrepancies that the Bidder has discovered in the Contract Documents,Addenda,and the related supplemental data and the written resolutions provided by the OAR are acceptable to the Bidder,and that the Contract Documents,Addenda, and the related supplemental data are generally sufficient to indicate and convey understanding of all terms and conditions for completion of Work. ARTICLE 7—INTERPRETATIONS AND ALTERNATE BIDS 7.01 Submit all questions about the meaning or intent of the Contract Documents,Addenda, and the related supplemental data using the Owner's Bidding Website at www.civcastusa.com. Responses to questions submitted will be posted on the website by the Owner for the benefit of all Bidders. Responses will be posted for questions submitted by 5:00 p.m.seven (7)days prior to the date of the bid opening. Inquiries made after this period may not be addressed. Invitation to Bid and Instructions to Bidders ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#1 Phase 1(Project No. E16246) PAGE 3 OF 10 7.02 Submit any offer of alternate terms and conditions,or offer of Work not in strict compliance with the Contract Documents to the OAR no later than 14 days prior to the date for opening of Bids. OAR and Designer will issue Addenda as appropriate if any of the proposed changes to the Contract Documents are accepted. A Bid submitted with clarifications or taking exceptions to the Contract Documents,except as modified by Addenda, may be considered non-responsive. 7.03 Addenda may be issued to clarify, correct,or change the Contract Documents,Addenda or the related supplemental data as deemed advisable by the Owner or Designer. Modifications to the Contract Documents prior to the award of contract can only be made by Addenda. Only answers in Addenda authorized by the Owner will be binding. Oral and other interpretations or clarifications will be without legal effect. ARTICLE 8—BID SECURITY 8.01 Bidders must submit an acceptable Bid Security with their Bid as a guarantee that the Bidder will enter into a contract for the Project with the Owner within 10 days of Notice of Award of the Contract. The security must be payable to the City of Corpus Christi,Texas in the amount of 5 percent(5%)of the greatest amount bid. 8.02 Bid Security may be in the form of a Bid Bond or a cashier's check, certified check, money order, or bank draft from a chartered financial institution authorized to operate in the State of Texas. Bidders submitting bids electronically through the CivCast System at www.CivCastUSA.com shall scan and upload a copy of Bid Bond as an attachment to their bid. Cashier's check,certified check, money order or bank draft must be enclosed in a sealed envelope, plainly identified on the outside as containing bid documents,the bidder's name and the job name and number and delivered as required in Article 7 below. 8.03 Bid Bond Requirements: 1. A Bid Bond must guarantee,without qualification or condition,that the Owner will be paid a sum equal to 5 percent(5%)of the greatest amount bid if, within 10 calendar days of Notice of Award of the Contract,the Bidder/Principal: a. fails to enter into a contract for the Project with the Owner; or b. fails to provide the required Performance and Payment Bonds. 2. A Bid Bond may not limit the sum payable to the Owner to be the difference between the Bidder/Principal's bid and the next highest bidder. 3. The Bid Bond must reference the Project by name as identified in Article 1. 4. Bidders may provide their surety's standard bid bond form if revised to meet these Bid Bond Requirements. 8.04 Failure to provide an acceptable Bid Security will constitute a non-responsive Bid which will not be considered. 8.05 Failure to provide the required Performance and Payment Bonds will result in forfeiture of the Bid Security to the City as liquidated damages. 8.05 Owner may annul the Notice of Award and the Bid Security of the Bidder will be forfeited if the apparent Selected Bidder fails to execute and deliver the Agreement or Amendments to the Invitation to Bid and Instructions to Bidders ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#1 Phase 1(Project No. E16246) PAGE 4 OF 10 Agreement. The Bid Security of other Bidders whom the Owner believes to have a reasonable chance of receiving the award may be retained by the Owner until the earlier of 7 days after the Effective Date of the Contract or 90 days after the date Bids are opened. 8.07 Bid Securities are to remain in effect until the Contract is executed. The Bid Securities of all but the three lowest responsible Bidders will be returned within 14 days of the opening of Bids. Bid Securities become void and will be released by the Owner when the Contract is awarded or all Bids are rejected. ARTICLE 9—PREPARATION OF BID 9.01 The Bid Form is included with the Contract Documents and has been made available at the Owner's Bidding Website. Complete all blanks on the Bid Form by typing or printing in ink. Indicate Bid prices for each Bid item or alternate shown. 9.02 Execute the Bid Acknowledgement Form as indicated in the document and include evidence of authority to sign. 9.03 Acknowledge receipt of all Addenda by filling in the number and date of each Addendum. Provide a signature as indicated to verify that the Addenda were received. A Bid that does not acknowledge the receipt of all Addenda may be considered non-responsive. 9.04 Provide the name,address,email, and telephone number of the individual to be contacted for any communications regarding the Bid in the Bid Acknowledgement Form. 9.05 Provide evidence of the Bidder's authority and qualification to do business in the State of Texas or covenant to obtain such qualification prior to award of the Contract. ARTICLE 10—CONFIDENTIALITY OF BID INFORMATION 10.01 In accordance with Texas Government Code 552.110,trade secrets and confidential information in Bids are not open for public inspection. Bids will be opened in a manner that avoids disclosure of confidential information to competing Bidders and keeps the Bids from the public during considerations. All Bids are open for public inspection after the Contract is awarded, but trade secrets and confidential information in Bids are not typically open for public inspection. The Owner will protect this information to the extent allowed by Laws and Regulations. Clearly indicate which specific documents are considered to be trade secrets or confidential information by stamping or watermarking all such documents with the word "confidential" prominently on each page or sheet or on the cover of bound documents. Place"confidential" stamps or watermarks so that they do not obscure any of the required information on the document, either in the original or in a way that would obscure any of the required information in a photocopy of the document. Photocopies of"confidential"documents will be made only for the convenience of the selection committee and will be destroyed after the Effective Date of the Contract. Original confidential documents will be returned to the Bidder after the Effective Date of the Contract if the Bidder indicates that the information is to be returned with the Bid, and arrangements for its return are provided by the Bidder. Invitation to Bid and Instructions to Bidders ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#1 Phase 1(Project No. E16246) PAGE 5 OF 10 ARTICLE 11—MODIFICATION OR WITHDRAWAL OF BID 11.01 A Bid may be withdrawn by a Bidder, provided an authorized individual of the Bidder submits a written request to withdraw the Bid prior to the time set for opening the Bids. 11.02 A Bidder may withdraw its Bid within 24 hours after Bids are opened if the Bidder files a signed written notice with the Owner and promptly, but no later than 3 days,thereafter demonstrates to the reasonable satisfaction of the Owner that there was a material and substantial mistake in the preparation of its Bid. The Bid Security will be returned if it is clearly demonstrated to the Owner that there was a material and substantial mistake in its Bid. A Bidder that requests to withdraw its Bid under these conditions may be disqualified from responding to a reissued invitation to Bid for the Work to be furnished under these Contract Documents. ARTICLE 12—BIDS REMAIN SUBJECT TO ACCEPTANCE 12.01 All Bids will remain subject to acceptance for 90 days, but the Owner may, at its sole discretion, release any Bid and return the Bid Security prior to the end of this period. ARTICLE 13—STATEMENT OF EXPERIENCE 13.01 Bidders must submit the information required in SECTION 00 4516 STATEMENT OF EXPERIENCE with the Bids to demonstrate that the Bidder meets the minimum requirements to complete the Work. Failure of Bidder to demonstrate,through submission of the Statement of Experience,the experience required as specified in Section 00 45 15 STATEMENT OF EXPERIENCE will be cause to refect a Bid. 13.02 ARTICLE 14—EVALUATION OF BIDS 14.01 The Owner will consider the amount bid,the Bidder's responsibilities,the Bidder's safety record, the Bidder's indebtedness to Owner,the Bidder's capacity to perform the work and/or whether the Bidder has met the minimum specific project experience requirements. 14.02 Owner may conduct such investigations as it deems necessary to establish the responsibility of the Bidder and any Subcontractors, individuals,or entities proposed to furnish parts of the Work in accordance with the Contract Documents. 14.03 Submission of a Bid indicates the Bidder's acceptance of the evaluation technique and methodology as well as the Bidder's recognition that some subjective judgments must be made by the Owner during the evaluation. Each Bidder agrees to waive any claim it has or may have against the OPT and their respective employees, arising out of or in connection with the administration, evaluation,or recommendation of any Bid. ARTICLE 15—AWARD OF CONTRACT 15.01 The Bidder selected for award of the Contract will be the lowest responsible Bidder that submits a responsive bid. Owner reserves the right to reject any and all Bids, including without limitation, non-conforming, non-responsive or conditional Bids. The Owner reserves the right to Invitation to Bid and Instructions to Bidders ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#1 Phase 1(Project No. E16246) PAGE 6 OF 10 adopt the most advantageous interpretation of the Bids submitted in the case of ambiguity or lack of clearness in stating Bid prices and/or waive any or all formalities. 15.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work shall be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest. ARTICLE 16—MINORITY/ MBE/DBE PARTICIPATION POLICY 16.01 Selected Contractor is required to comply with the Owner's Minority/MBE/DBE Participation Policy as indicated in SECTION 00 72 03 MINORITY/MBE/DBE PARTICIPATION POLICY. 16.02 Minority participation goal for this Project has been established to be 451yo. 16.03 Minority Business Enterprise participation goal for this Project has been established to be 15%. X46. ARTICLE 17—BONDS AND INSURANCE 17.01 Article 6 of the General Conditions and SECTION 00 72 01 INSURANCE REQUIREMENTS sets forth the Owner's requirements as to Bonds and insurance. When the Selected Bidder delivers the executed Agreement to the Owner, it must be accompanied by the required Bonds and evidence of insurance. 17.02 Provide Performance and Payment Bonds for this Project that fully comply with the provisions of Texas Government Code Chapter 2253. Administration of Bonds will conform to Texas Government.Code Chapter 2253 and the provisions of these Contract Documents. ARTICLE 18—SIGNING OF AGREEMENT 18.01 The City Engineer or Director of Capital Programs will submit recommendation for award to the City Council for those project awards requiring City Council action. The Selected Bidder will be required to deliver the required Bonds and insurance certificates and endorsements along with the required number of counterparts(1)of the Agreement and attached documents to the Owner within 14 days.The Contract will be signed by the City Manager or his/her designee after award and the Bidder's submission of required documentation and signed counterparts. The Contract will not be binding upon Owner until it has been executed by both parties. Owner will process the Contract expeditiously. However,Owner will not be liable for any delays prior to the award or execution of Contract. ARTICLE 19—SALES AND USE TAXES 19.01 The Owner generally qualifies as a tax exempt agency as defined by the statutes of the State of Texas and is usually not subject to any City or State sales or use taxes, however certain items such as rented equipment may be taxable even though Owner is a tax-exempt agency. Assume responsibility for including any applicable sales taxes in the Contract Price and assume Invitation to Bid and Instructions to Bidders ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#1 Phase 1(Project No. E16246) PAGE 7 OF 10 responsibility for complying with all applicable statutes and rulings of the State of Texas Comptroller. 19.02 It is the Owner's intent to have this Contract qualify as a "separated contract." ARTICLE 20—WAGE RATES 20.01 This Contract is subject to Texas Government Code Chapter 2258 concerning payment of prevailing wage rates. Requirements for paying the prevailing wage rates are discussed in SECTION 00 72 02 WAGE RATE REQUIREMENTS. Bidders must pay not less than the minimum wage shown on this list and comply with all statutes and rulings of the State of Texas Comptroller. ARTICLE 21—BIDDER'S CERTIFICATION OF NO LOBBYING 21.01 In submitting its Bid, Bidder certifies that it has not lobbied the City or its officials, managers, employees,consultants, or contractors in such a manner as to influence or to attempt to influence the bidding process. In the event it reasonably appears that the Bidder influenced or attempted to influence the bidding process,the City may, in its discretion, reject the Bid. ARTICLE 22—CONFLICT OF INTEREST 22.01 Bidder agrees to comply with Chapter 176 of the Texas Local Government Code and file Form CIQ with the City of Corpus Christi City Secretary's Office, if required. For more information on Form CIQ and to determine if you need to file a Form CIO, please review the information on the City Secretary's website at http://www.cctexas.com/government/city-secretary/conflict- disclosure/index. ARTICLE 23—CERTIFICATE OF INTERESTED PARTIES 23.01 Bidder agrees to comply with Texas Government Code section 2252.908 and complete Form 1295 Certificate of Interested Parties as part of this contract, if required. For more information, please review the information on the Texas Ethics Commission website at https://www.ethics.state.tx.us. ARTICLE 24- REJECTION OF BID 24.01 The following will be cause to reject a Bid: A. Bids which are not signed by an individual empowered to bind the Bidder. B. Bids which do not have an acceptable Bid Security,with Power of Attorney,submitted as required by Article 7. C. Mare than one Bid for same Work from an individual,firm, partnership or corporation. D. Evidence of collusion among Bidders. E. Sworn testimony or discovery in pending litigation with Owner which discloses misconduct or willful refusal by bidder to comply with subject contract or instructions of Owner. Invitation to Bid and Instructions to Bidders ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#1 Phase 1(Project No. E16246) PAGE 8 OF 10 G. Bids received from a Bidder who has been debarred or suspended by Owner. H. Bids received from a Bidder when Bidder or principals are currently debarred or suspended by Federal,State or City governmental agencies. I. Failure of Bidder to demonstrate,through submission of the Statement of Experience,the experience required as specified in Section 00 45 16 STATEMENT OF EXPERIENCE. J. Failure to submit Bid information specified in Section 00 45 16 STATEMENT OF EXPERIENCE with the bid. 24.02 The following may be cause to reject a Bid or cause to deem a Bid non-responsive or irregular. The City reserves the right to waive any irregularities and any or all formalities: A. Poor performance in execution of work under a previous City of Corpus Christi contract. B. Failure to achieve reasonable progress on an existing City of Corpus Christi contract. Evidence of Bidder's recurring failure to complete an item of work within a timeframe acceptable to the City or in accordance with a City-accepted schedule is evidence of Bidder's failure to achieve reasonable progress under this subsection. C. Default on previous contracts or failure to execute Contract after award. D. Evidence of failure to pay Subcontractors,Suppliers or employees in accordance with Contract requirements. E. Bids containing omissions, alterations of form, additions, qualifications or conditions not called for by Owner, or incomplete Bids may be rejected. In any case of ambiguity or lack of clarity in the Bid,OWNER reserves right to determine most advantageous Bid or to reject the Bid. F. Failure to acknowledge receipt of Addenda. G. Fail-Wo-%@ submit la@st_Rid iAfQFA;ati.,., s rified i.,Co +:..,(1fl A� 1G CTA TC AACAIT f1C EXPER ICAIf E i..i+hi..ths- 2I1o_%ta 1 H. Failure to timely execute Contract after award. I. Previous environmental violations resulting in fines or citations by a governmental entity (i.e. U.S. Environmental Protection Agency,Texas Commission on Environmental Quality, etc.). J. Bidder's Safety Experience. +h® hi.d.diRg.19G U.. PRk L. Evidence of Bidder's lack of sufficient resources,workforce, equipment or supervision, if required by inclusion of appropriate requirements in Section 00 45 16 STATEMENT OF EXPERIENCE. M. Evidence of poor performance on previous Projects as documented in Owner's project performance evaluations. N. Unbalanced Unit Price Bid: "Unbalanced Bid" means a Bid, which includes a Bid that is based on unit prices which are significantly less than cost for some Bid items and significantly more than cost for others. This may be evidenced by submission of unit price Invitation to Bid and Instructions to Bidders ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#1 Phase 1(Project No. E16246) PAGE 9 OF 10 Bid items where the cost are significantly higher/lower than the cost of the same Bid items submitted by other Bidders on the project. O. Evidence of Bidder's lack of capacity to perform the Work. Evidence of Bidder's lack of capacity. Evidence of capacity to perform the Work will include a factual review of{i}all remaining work or incomplete work items under any existing city or non-city contract; (ii) ability to perform the Work with remaining sufficient resources,workforce,equipment and supervision/supervisory staff; (iii) ability in the past to timely complete the same or similar work in a good and workmanlike manner utilizing same or similar remaining resources or under the same or similar conditions. Evidence of incomplete work items under any existing City-awarded IDIQ or other contract for similar work may constitute a lack of capacity to perform the Work. END OF SECTION Invitation to Bid and Instructions to Bidders ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#1 Phase 1(Project No. E16246) PAGE 10 OF 10 00 30 00 BID ACKNOWLEDGEMENT FORM ARTICLE 1—BID RECIPIENT In accordance with the Drawings, Specifications,and Contract Documents,this Bid Proposal is submitted by (type or print name of company) on: Wednesday, November 30, 2016 at 2:00 P.M for O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246). 1.01 Submit Bids, Bid Security and all attachments to the Bid (See Section 7.01 below)to the City's electronic bidding website at www.CivCastUSA.com. If submitting hard copy bids or bid security in the form of a cashier's or certified check, please send to: The City of Corpus Christi,Texas City Secretary's Office 1201 Leopard Street Corpus Christi,Texas 78401 Attention: City Secretary Bid-O.N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 Project No. E16246 All envelopes and packages(including FEDEX envelopes) must clearly identify,on the OUTSIDE of the package,the project name and number and that bid documents are enclosed. ARTICLE 2—BIDDERS'S ACKNOWLEDGMENTS 2.01 Bidder proposes and agrees, if this Bid is accepted,to enter into an Agreement with Owner on the form included in the Contract Documents,to perform all Work specified or indicated in Contract Documents for the Contract Price indicated in this Bid or as modified by Contract Amendment. Bidder agrees to complete the Work within the Contract Times established in the Agreement or as modified by Contract Amendment and comply with the all other terms and conditions of the Contract Documents. 2.02 Bidder accepts all of the terms and conditions of SECTION 00 2113 INVITATION AND INSTRUCTIONS TO BIDDERS, including those dealing with required Bonds. The Bid will remain subject to acceptance for 90 days after the opening of Bids. 2.03 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of its failure to complete Work in accordance with the schedule set forth in the Agreement. 2.04 Bidder acknowledges receipt of the following Addenda: Addendum No. Addendum Date Signature Acknowledging Receipt 1 11/11/16 2 11/18/16 Bid Acknowledgement Form ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#2 Phase 1(Project No. E16246) PAGE 1 OF 6 Addendum No. Addendum Date Signature Acknowledging Receipt 3 11/23/16 ARTICLE 3—BIDDER'S REPRESENTATIONS 3.01 The Bidder has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. 3.02 The Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. 3.03 The Bidder is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work. 3.04 The Bidder has carefully studied the following Site-related reports and drawings as identified in the Supplementary Conditions: A. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; B. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; C. Underground Facilities referenced in reports and drawings; D. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and E. Technical Data related to each of these reports and drawings. 3.05 The Bidder has considered the: A. Information known to Bidder; B. Information commonly known to contractors doing business in the locality of the Site; C. Information and observations obtained from visits to the Site;and D. The Contract Documents. 3.05 The Bidder has considered the items identified in Paragraphs 3.04 and 3.05 with respect to the effect of such information,observations,and documents on: A. The cost, progress,and performance of the Work; B. The means, methods,techniques,sequences,and procedures of construction to be employed by Bidder;and C. Bidder's safety precautions and programs. 3.07 Based on the information and observations referred to in the preceding paragraphs, Bidder agrees that no further examinations, investigations,explorations,tests, studies, or data are necessary for the performance of the Work at the Contract Price,within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. Bid Acknowledgement Form ADDENDUM#3 0.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#2 Phase 1(Project No. E16246) PAGE 2 OF 6 3.08 The Bidder is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. 3.09 The Bidder has correlated the information known to the Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents,and all additional examinations, investigations, explorations,tests,studies, and data with the Contract Documents. 3.10 The Bidder has given the OAR written notice of all conflicts,errors,ambiguities,or discrepancies that the Bidder has discovered in the Contract Documents, and the written resolution provided by the OAR is acceptable to the Bidder. 3.11 The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 3.12 Bidder's entry into this Contract constitutes an incontrovertible representation by Bidder that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. ARTICLE 4—BASIS OF BID 4.01 Bidder will complete the Work in accordance with the Contract Documents at the unit prices shown in the BID FORM. A. Extended amounts have been computed in accordance with Paragraph 13.03 of the General Conditions. B. Bidder acknowledges that the estimated quantities are not guaranteed, and final payment for all Unit Price items will be based on actual quantities provided, measured as provided in the Contract Documents. C. Unit Price and figures column will be used to compute the actual Bid price. ARTICLE 5—EVALUATION OF BIDDERS 5.01 The contract may be awarded either to the lowest responsible bidder or to the bidder who provides the best value for the Owner. The Owner will consider the amount bid,the Bidder's responsibility,the Bidder's safety record,the Bidder's indebtedness to Owner and whether the Bidder has met the minimum specific project experience requirements to determine the lowest responsible Bidder.The Owner reserves the right to waive any and all irregularities in determining the Bidders' responsibility or value, and whether the Bidder has met the minimum specific project experience requirements,and reserves the right to require the submission of additional information. 5.02 The Owner has the right to accept a Bid, reject any and all Bids,to waive any and all irregularities in the Bids, or to reject non-conforming, non-responsive or conditional Bids. In addition,the Owner reserves the right to reject any Bid where circumstances and developments have, in the opinion of the Owner, changed the responsibility of the Bidder. 5.03 Material misstatements in the documentation submitted to determine the Bidder's responsibility, including information submitted per SECTION 00 45 16 STATEMENT OF Bid Acknowledgement Form ADDENDUM#3 0.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#2 Phase 1(Project No. E16246) PAGE 3 OF 6 EXPERIENCE, may be grounds for rejection of the Bidder's Bid on this Project. Any such misstatement, if discovered after award of the Contract to such Bidder, may be grounds for immediate termination of the Contract. Additionally,the Bidder will be liable to the Owner for any additional costs or damages to the Owner resulting from such misstatements, including costs and attorney's fees for collecting such costs and damages. ARTICLE 6—TIME OF COMPLETION 6.01 Bidder will complete the Work required to be substantially completed within 365 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions. Bidder will complete the Work required for final payment in accordance with Paragraph 15.05 of the General Conditions within 395 days after the date when the Contract Times commence to run. 6.02 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within the number of days indicated. ARTICLE 7—ATTACHMENTS TO THIS BID In compliance with the Bid Requirements in SECTION 00 2113 INVITATION TO BID AND INSTRUCTIONS TO BIDDERS,the following are made a condition of this Bid: A. Bid Security. B. SECTION 00 30 00 BID ACKNOWLEDGEMENT FORM and documentation of signatory authority. C. SECTION 00 30 01 BID FORM. D. SECTION 00 30 02 COMPLIANCE TO STATE LAW ON NONRESIDENT BIDDERS. E. SECTION 00 30 05 DISCLOSURE OF INTEREST. F. SECTION 00 30 06 NON-COLLUSION CERTIFICATION. G. SECTION 00 45 16 STATEMENT OF EXPERIENCE ARTICLE 8—DEFINED TERMS 8.01 The terms used in this Bid have the meanings indicated in the General Conditions and the Supplementary Conditions. The significance of terms with initial capital letters is described in the General Conditions. ARTICLE 9—VENUE 9.01 Bidder agrees that venue shall lie exclusively in Nueces County,Texas for any legal action. ARTICLE 10—SIGNATORY REQUIREMENTS FOR BIDDERS 10.01 Bidders must include their correct legal name,state of residency, and federal tax identification number in the Bid Form. Bid Acknowledgement Form ADDENDUM#3 0.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#2 Phase 1(Project No. E16246) PAGE 4 OF 6 10.02 The Bidder,or the Bidder's authorized representative, shall sign and date the Bid Form to accompany all materials included in the submitted Bid. Bids which are not signed and dated in this manner, or which do not contain the required documentation of signatory authority may be rejected as non-responsive. The individual(s) signing the Bid must have the authority to bind the Bidder to a contract,and if required,shall attach documentation of signatory authority to the Bid Form. 10.03 Bidders who are individuals ("natural persons"as defined by the Texas Business Organizations Code§1.002), but who will not be signing the Bid Form personally,shall include in their bid a notarized power of attorney authorizing the individual designated as their authorized representative to submit the Bid and to sign on behalf of the Bidder. 10.04 Bidders that are entities who are not individuals shall identify in their Bid their charter or Certificate of Authority number issued by the Texas Secretary of State and shall submit with their Bid a copy of a resolution or other documentation approved by the Bidder's governing body authorizing the submission of the Bid and designating the individual(s) authorized to execute documents on behalf of the Bidder. Bidders using an assumed name(an"alias")shall submit a copy of the Certificate of Assumed Name or similar document. 10.05 Bidders that are not residents of the State of Texas must document their legal authority to conduct business in Texas. Nonresident Bidders that have previously registered with the Texas Secretary of State may submit a copy of their Certificate of Authority. Nonresident Bidders that have not previously registered with the Texas Secretary of State shall submit a copy of the Bidder's enabling documents as filed with the state of residency,or as otherwise existing. Bid Acknowledgement Form ADDENDUM#3 0.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#2 Phase 1(Project No. E16246) PAGE 5 OF 6 ARTICLE 11—BID SUBMITTAL 11.01 This Bid is submitted by: Bidder: (typed or printed full legal name of Bidder) By: (individual's signature) Name: (typed or printed) Title: (typed or printed) Attest: (individual's signature) State of Residency: Federal Tax Id. No. Address for giving notices: Phone: Email: (Attach evidence of authority to sign if the authorized individual is not the Bidder, but an individual signing on behalf of another individual Bidder, or if the authorized individual is a representative of a corporation, partnership,orjoint venture.) END OF SECTION Bid Acknowledgement Form ADDENDUM#3 0.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#2 Phase 1(Project No. E16246) PAGE 6 OF 6 00 30 01 BID FORM Project O N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 Name: Project E15246 Number: Owner: City of Corpus Christi Bidder: OAR: TBD Designer: LNV, Inc. Basis of Bid QUANTITY(Bid Item DESCRIPTION UNIT Evaluation UNIT PRICE EXTENDED ONLY-NOT AMOUNT FOR AWARD) Base Bid PART A-GENERAL(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) Al Mobilization, Not to Exceed 7.5%of total Bid. LS 1 Complete in Place per Lump Sum. Dredge, Dewater and Haul residuals from Lagoon#7 including all work and materials considered subsidiary to this bid item (subsidiary items include but are not limited to;furnishing dredge equipment,furnish and install turbidity protection for washwater return pump station,furnish and install dewatering equipment, A2 polymer injection equipment, residual and polymer DT 10,000 containment areas as required,filtrate return provisions,trucks,fuel,truck maintenance, maintenance of access, electrical feed for dewatering equipment, permits, licenses and certifications as required,and residual analytical testing) as per specification, Complete in Place per Dry Ton. Remove cattails and other aquatic vegetation from A3 Lagoon#7,as necessary to perform the required LS 1 dredging,Complete in Place per Lump Sum. SUBTOTAL PART A-GENERAL(Items Al thru A3) TOTAL EXTENDED AMOUNT FOR ITEM A2 IS FOR BID EVALUATION PURPOSES ONLY ADDENDUM#3 Bid Form ATTACHMENT#3 0.N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1(E16246) Page 1 of 2 00 30 01 BID FORM BID SUMMARY SUBTOTAL PART A-GENERAL(Items Al thru A3) TOTAL PROJECT BASE BID(PART A) Contract Times Bidder agrees to reach Substantial Completion in 1 365 Idays Bidder agrees to reach Final Completion in 1 395 Idays ADDENDUM#3 Bid Form ATTACHMENT#3 0.N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1(E16246) Page 2 of 2 00 72 01 INSURANCE REQUIREMENTS ARTICLE 1—INSURANCE REQUIREMENTS 1.01 CONTRACTOR'S INSURANCE AMOUNTS A. Provide the insurance coverage for at least the following amounts unless greater amounts are required by Laws and Regulations: Type of Insurance Minimum Insurance Coverage Commercial General Liability including 1. Commercial Form 2. Premises—Completed Operations 3. Explosions and Collapse Hazard 4. Underground Hazard 5. Products/Completed Operations $1,000,000 Per Occurrence Hazard $2,000,000 Aggregate 6. Contractual Liability 7. Broad Form Property Damage 8. Independent Contractors 9. Personal &Advertising Injury Business Automobile Liability-Owned, $1,000,000 Combined Single Limit Non-Owned, Rented and Leased Workers'Compensation Statutory Employer's Liability $500,000/500,000/500,000 Excess Liability/Umbrella Liability $1,000,000 Per Occurrence Required if Contract Price>$5,000,000 Contractor's Pollution Liability/ $1,000,000 Per Claim Environmental Impairment Coverage Not limited to sudden and accidental ® Required ❑ Not Required discharge. To include long-term environmental impact for the disposal of pollutants/contaminants. Required if excavation>3 ft Builder's Risk(All Perils including Collapse) Equal to Full Replacement Cost of Structure and Contents Required for vertical structures and bridges ❑ Required ® Not Required Installation Floater Equal to Contract Price Required if installing city-owned equipment ® Required ❑ Not Required Insurance Requirements ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#4 Phase 1(Project No. E16246) PAGE 1 OF 10 1.02 GENERAL PROVISIONS A. Provide insurance coverages and limits meeting the requirements for insurance in accordance with Article 6 of the General Conditions and this Section. B. Provide endorsements to the policies as outlined in this Section. C. Obtain insurance from companies that are duly licensed or authorized in the State of Texas to issue insurance policies for the required limits and coverages. Provide insurance from companies that have an A.M. Best rating of A-VIII or better. D. Furnish copies of endorsements and documentation of applicable self-insured retentions and deductibles upon request by OPT or any named insured or additional insured. Contractor may block out(redact)any confidential premium or pricing information contained in any endorsement furnished under this Contract. E. The name and number of the Project must be referenced on the certificate of insurance. F. OPT's failure to demand such certificates or other evidence of the Contractor's full compliance with the insurance requirements or failure to identify a deficiency in compliance from the evidence provided is not a waiver of the Contractor's obligation to obtain and maintain the insurance required by the Contract Documents. G. Notify the Owner if the Contractor fails to purchase or maintain the insurance required by the Contract.Documents. Contractor shall not be allowed to perform any Work on the Project until the required insurance policies are in effect. A Certificate of Liability Insurance shall be submitted to the OPT. H. Owner may exclude the Contractor from the Site and exercise Owner's termination rights under Article 16 of the General Conditions if Contractor fails to obtain or maintain the required insurance. I. Owner does not represent that the insurance coverage and limits established in this Contract are adequate to protect Contractor or Contractor's interests. J. The required insurance and insurance limits do not limit the Contractor's liability under the indemnities granted to Owner's Indemnitees in the Contract Documents. K. Provide for an endorsement that the"other insurance"clause shall not apply to the OPT where the OPT is an additional insured shown on the policy. Contractor's insurance is primary and non-contributory with respect to any insurance or self-insurance carried by the OPT for liability arising out of operations under this Contract. L. Include the Owner and list the other members of the OPT and any other individuals or entities identified in the Supplementary Conditions as additional insureds on all policies with the exception of the workers'compensation policy and Contractor's professional liability policy. 1.03 CONTRACTOR'S INSURANCE A. Purchase and maintain workers'compensation and employer's liability insurance for: 1. Claims under workers'compensation, disability benefits,and other similar employee benefit acts. Obtain workers' compensation coverage through a licensed insurance company in accordance with Texas law and written on a policy and endorsements Insurance Requirements ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#4 Phase 1(Project No. E16246) PAGE 2 OF 10 approved by the Texas Department of Insurance. Provide insurance in amounts to meet all workers' compensation obligations. Provide an "All Other States" endorsement if Contractor is not domiciled in Texas and policy is not written in accordance with Texas Department of Insurance rules. 2. Claims for damages because of bodily injury,occupational sickness or disease, or death of Contractor's employees. 3. United States Longshoreman and Harbor Workers'Compensation Act and Jones Act coverage(if applicable). 4. Foreign voluntary worker compensation (if applicable). B. Purchase and maintain commercial general liability insurance covering all operations by or on behalf of Contractor. The expected coverage is that which would be included in a commercially available ISO Commercial General Liability policy and should provide coverage on an occurrence basis, against: 1. Claims for damages because of bodily injury, sickness or disease,or death of any person other than Contractor's employees; 2. Claims for damages insured by reasonably available personal injury liability coverage which are sustained; 3. By any person as a result of an offense directly or indirectly related to the employment of such person by Contractor;and 4. Claims for damages, other than to the Work itself, because of injury to or destruction of tangible property wherever located, including any resulting loss of use. C. Provide Contractor's commercial general liability policy that is written on a 1996(or later) ISO commercial general liability form(occurrence form) and include the following coverages and endorsements: 1. Products and completed operations coverage as required in this Section. Insurance is to remain in effective for 3 years after final payment. Furnish evidence of the continuation of this insurance at final payment and again each year for 3 years after final payment to Owner and each named insured or additional insured. a. If required by Paragraph 1.01, provide and maintain Installation Floater insurance for property under the care,custody,or control of Contractor. Provide Installation Floater insurance that is a broad form or"AII Peril" policy providing coverage for all materials, supplies, machinery,fixtures, and equipment which will be incorporated into the Work. 1) Provide coverage under the Contractor's Installation Floater that includes: a) Faulty or Defective workmanship, materials, maintenance, or construction; b) Cost to remove Defective or damaged Work from the Site or to protect it from loss or damage; c) Cost to cleanup and remove pollutants; d) Coverage for testing and startup; Insurance Requirements ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#4 Phase 1(Project No. E16246) PAGE 3 OF 10 ej Any loss to property while in transit; f) Any loss at the Site; gj Any loss while in storage, both on and off the Site; and h) Any loss to temporary Project Works if their value is included in the Contract Price. 2) Coverage cannot be contingent on an external cause or risk or limited to property for which the Contractor is legally liable. Provide limits of insurance adequate to cover the value of the installation. Pay any deductible carried under this coverage and assume responsibility for claims on materials, supplies, machinery,fixture,and equipment which will be incorporated into the Work while in transit or in storage. 2. Blanket contractual liability coverage for Contractor's contractual indemnity obligations in Paragraph 7.14 of the General Conditions,and all other contractual indemnity obligations of Contractor in the Contract Documents. Industry standard ISO Contractual Liability coverage will meet this obligation. 3. Broad form property damage coverage. 4. Severability of interest. 5. Underground explosion and collapse coverage. 6. Personal injury coverage. 7. Endorsement CG 2032, "Additional Insured - Engineers,Architects or Surveyors Not Engaged by the Named Insured"or its equivalent. D. Purchase and maintain automobile liability insurance against claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, maintenance or use of any motor vehicle. E. For Projects with a Contract Value that exceeds$5,000,000, purchase and maintain umbrella or excess liability insurance written over the underlying employer's liability, commercial general liability, and automobile liability insurance described in the paragraphs above. Provide coverage that is at least as broad as all underlying policies. Provide a policy that provides first-dollar liability coverage as needed. F. Provide Contractor's commercial general liability and automobile liability policies that: 1. Are written on an occurrence basis; 2. Include the individuals or entities identified in the Supplementary Conditions as additional insureds; 3. Include coverage for Owners Indemnitees as defined in Article 1 of the General Conditions;and 4. Provide primary coverage for all claims covered by the policies, including those arising from both ongoing and completed operations. G. Purchase and maintain insurance coverage for third-party injury and property damage claims, including clean-up costs that result from Hazardous Environmental Conditions Insurance Requirements ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#4 Phase 1(Project No. E16246) PAGE 4 OF 10 which result from Contractor's operations and completed operations. Provide Contractor's pollution liability insurance that includes long-term environmental impacts for the disposal of pollutants/contaminants and is not limited to sudden and accidental discharge. The completed operations coverage is to remain in effect for 3 years after final payment. The policy must name OPT and any other individuals and entities identified in the Supplementary Conditions as additional insureds. H. Purchase and maintain applicable professional liability insurance,or have Subcontractors and Suppliers do so, if Contractor or any Subcontractor or Supplier will provide or furnish professional services under this Contract. I. The policies of insurance required by this Section must: 1. Include at least the specific coverages and be written far not less than the limits of liability provided in this Section or required by Laws or Regulations, whichever is greater. 2. Contain a provision that coverage afforded will not be canceled or materially changed until at least 30 days prior written notice has been given to Contractor, Owner, and all named insureds and additional insureds. 3. Remain in effect at all times when Contractor is performing Work or is at the Site to conduct tasks arising from the Contract Documents. 4. Be appropriate for the Work being performed and provide protection from claims resulting from the Contractor's performance of the Work and Contractor's other obligations under the Contract Documents,whether performed by Contractor, Subcontractor,Supplier,anyone directly or indirectly employed or retained by any of them, or by anyone for whose acts they may be liable. J. The coverage requirements for specific policies of insurance must be met directly by those policies and may not rely on excess or umbrella insurance provided in other policies to meet the coverage requirement. 1.04 PROPERTY INSURANCE A. Purchase and maintain builder's risk insurance in the amount of the full replacement cost of the Project. This policy is subject to the deductible amounts requirements in this Section or those required by Laws and Regulations and must comply with the requirements of Paragraph 1.06. This insurance shall: 1. Include the OPT,Contractor,and all Subcontractors, and any other individuals or entities identified in the Supplementary Conditions,as named insureds. 2. Be written on a builder's risk"all risk" policy form that includes insurance for physical loss or damage to the Work,temporary buildings,falsework, and materials and equipment in transit, and insures against at least the following perils or causes of loss: fire; lightning;windstorm; riot; civil commotion;terrorism;vehicle impact; aircraft; smoke;theft;vandalism and malicious mischief; mechanical breakdown, boiler explosion,and artificially generated electric current;earthquake;volcanic activity,and other earth movement;flood; collapse; explosion; debris removal; demolition occasioned by enforcement of Laws and Regulations;water damage(other than that caused by flood); and such other perils or causes of loss as may be specifically required Insurance Requirements ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#4 Phase 1(Project No. E16246) PAGE 5 OF 10 by this Section. If insurance against mechanical breakdown, boiler explosion,and artificially generated electric current; earthquake; volcanic activity,and other earth movement; or flood, are not commercially available under builder's risk, by endorsement or otherwise,this insurance may be provided through other insurance policies acceptable to Owner and Contractor. 3. Cover expenses incurred in the repair or replacement of any insured property. 4. Cover materials and equipment in transit or stored prior to being incorporated in the Work. 5. Cover Owner-furnished or assigned property. 6. Allow for partial utilization of the Work by Owner. 7. Allow for the waiver of the insurer's subrogation rights as set forth below. 8. Provide primary coverage for all losses and damages caused by the perils or causes of loss covered. 9. Not include a co-insurance clause. 10. Include a broad exception for ensuing losses from physical damage or loss with respect to any Defective workmanship, design, or materials exclusions. 11. Include testing and startup. 12. Be maintained in effect until the Work as a whole is complete, unless otherwise agreed to in writing by Owner and Contractor. B. Evidence of insurance provided must contain a provision or endorsement that the coverage afforded will not be canceled or materially changed or renewal refused until at least 30 days prior written notice has been given to Owner and Contractor and to each named insured. C. Pay for costs not covered by the policy deductible. D. Notify builder's risk insurance provider if Owner will occupy or use a portion or portions of the Work prior to Substantial Completion of all the Work as provided in Paragraph 15.04 of the General Conditions. Maintain the builder's risk insurance in effect during this Partial Occupancy or Use. E. Contractor may purchase other special insurance to be included in or to supplement the builder's risk or property insurance policies provided under this Section. F. Contractor,Subcontractors, or employees of the Contractor or a Subcontractor owning property items, such as tools, construction equipment,or other personal property not expressly covered in the insurance required by the Contract Documents are responsible for providing their own insurance. 1.05 WAIVER OF RIGHTS A. Insurance shall include a waiver of subrogation in favor of the additional insureds identified in SECTION 00 73 00 SUPPLEMENTARY CONDITIONS. B. All policies purchased in accordance with this Section are to contain provisions to the effect that the insurers have no rights of recovery against OPT, named insureds or additional Insurance Requirements ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#4 Phase 1(Project No. E16246) PAGE 6 OF 10 insureds in the event of a payment for loss or damage. Contractor and insurers waive all rights against the Owner's Indemnities for losses and damages created by or resulting from any of the perils or causes of loss covered by these policies and any other applicable property insurance. None of these waivers extend to the rights Contractor has to the proceeds of insurance as trustee. C. Contractor is responsible for assuring that agreements with Subcontractors contains provisions that the Subcontractor waive all rights against Owner's Indemnitees,Contractor, named insureds and additional insureds, and the officers,directors, members, partners, employees,agents,consultants, and subcontractors of each and any of them,for all losses and damages created by or resulting from any of the perils or causes of loss covered by builder's risk insurance and other property insurance. 1.05 OWNER'S INSURANCE FOR THE PROJECT A. Owner is not responsible for purchasing and maintaining any insurance to protect the interest of the Contractor,Subcontractors,or others in the Work. The stated limits of insurance required are minimum only. Determine the limits that are adequate. These limits may be basic policy limits or any combination of basic limits and umbrella limits. In any event, Contractor is fully responsible for all losses arising out of, resulting from,or connected with operations under this Contract whether or not these losses are covered by insurance. The acceptance of evidence of insurance by the OPT, named insureds, or additional insureds does not release the Contractor from compliance with the insurance requirements of the Contract Documents. ARTICLE 2—EVIDENCE OF INSURANCE 2.01 ACCEPTABLE EVIDENCE OF INSURANCE A. Provide evidence of insurance acceptable to the Owner with the executed Contract Documents. Provide the following as evidence of insurance: 1. Certificates of Insurance on an acceptable form; 2. Riders or endorsements to policies; and 3. Policy limits and deductibles. B. Provide a list of"Additional Insureds"for each policy. C. Provide evidence that waivers of subrogation are provided on all applicable policies. D. Provide evidence of requirements for 30 days' notice before cancellation or any material change in the policy's terms and conditions, limits of coverage,or change in deductible amount. 2.02 CERTIFICATES OF INSURANCE A. Submit Certificates of Insurance meeting the following requirements: 1. Farm has been filed with and approved by the Texas Department of Insurance under Texas Insurance Code§1811.101; or Insurance Requirements ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#4 Phase 1(Project No. E16246) PAGE 7 OF 10 2. Form is a standard form deemed approved by the Department under Texas Insurance Code§1811.101. 3. No requirements of this Contract may be interpreted as requiring the issuance of a certificate of insurance on a certificate of insurance form that has not first been filed with and approved by the Texas Department of Insurance. B. Include the name of the Project in the description of operations box on the certificate of insurance. 2.03 INSURANCE POLICIES A. If requested by the Owner, provide a copy of insurance policies, declaration pages and endorsements, and documentation of applicable self-insured retentions and deductibles. B. Contractor may block out(redact)any proprietary information or confidential premium pricing information contained in any policy or endorsement furnished under this Contract. 2.04 CONTINUING EVIDENCE OF COVERAGE A. Provide updated, revised, or new evidence of insurance in accordance this Section prior to the expiration of existing policies. B. Provide evidence of continuation of insurance coverage at final payment and for the following 3 years. 2.05 NOTICES REGARDING INSURANCE A. Notices regarding insurance are to be sent to the Owner at the following address: City of Corpus Christi—Engineering Attn:Construction Contract Admin. P.O. Box 9277 Corpus Christi,TX 78459-9277 B. Submit questions regarding insurance requirements to the Construction Contract Administrator by calling 361-826-3530. ARTICLE 3—TE]tAS WORKERS' COMPENSATION INSURANCE REQUIRED NOTICE 3.01 WORKERS'COMPENSATION INSURANCE COVERAGE A. Definitions: 1. Certificate of coverage("certificate")-A copy of a certificate of insurance,a certificate of authority to self-insure issued by the commission,or a coverage agreement(TWCC- 81,TWCC-82,TWCC-83,or TWCC-84),showing statutory workers'compensation insurance coverage for the person's or entity's employees providing services on a project,for the duration of the Project. 2. Duration of the Project-includes the time from the beginning of the Work on the Project until the Contractor's person's Work on the Project has been completed and accepted by the governmental entity. Insurance Requirements ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#4 Phase 1(Project No. E16246) PAGE 8 OF 10 3. Persons providing services on the Project("Subcontractor" in§406.096)-includes all persons or entities performing all or part of the services the Contractor has undertaken to perform on the Project, regardless of whether that person contracted directly with the Contractor and regardless of whether that person has employees. This includes,without limitation, independent contractors, subcontractors, leasing companies, motor carriers,owner-operators,employees of any such entity, or employees of any entity which furnishes persons to provide services on the Project. "Services" include,without limitation, providing, hauling, or delivering equipment or materials, or providing labor,transportation, or other service related to a project. "Services"does not include activities unrelated to the Project, such as food beverage vendors, office supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements,which meets the statutory requirements of Texas Labor Code,Section 4O1.O11(44)for all employees of the Contractor providing services on the Project,for the duration of the Project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the Contract. D. If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the Project,the Contractor must, prior to the end of the coverage period,file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project,and provide to the governmental entity: 1. A certificate of coverage, prior to that person beginning Work on the Project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the Project;and 2. No later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. F. The Contractor shall retain all required certificates of coverage for the duration of the Project and for one year thereafter. G. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery,within 10 days after the Contractor knew or should have known,of any change that materially affects the provision of coverage of any person providing services on the Project. H. The Contractor shall post on each Project Site a notice, in the text,form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the Project that they are required to be covered,and stating how a person may verify coverage and report lack of coverage. Insurance Requirements ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#4 Phase 1(Project No. E16246) PAGE 9 OF 10 I. The Contractor shall contractually require each person with whom it contracts to provide services on a project,to: 1. Provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code,Section 401.011(44)far all of its employees providing services on the Project,for the duration of the Project; 2. Provide to the Contractor, prior to that person beginning Work on the Project,a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the Project,for the duration of the Project; 3. Provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; 4. Obtain from each other person with whom it contracts, and provide to the Contractor: a. A certificate of coverage, prior to the other person beginning Work on the Project; and b. A new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; 5. Retain all required certificates of coverage on file for the duration of the Project and for one year thereafter; 5. Notify the governmental entity in writing by certified mail or personal delivery,within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the Project;and 7. Contractually require each person with whom it contracts,to perform as required by paragraphs (1)-(7),with the certificates of coverage to be provided to the person for whom they are providing services. J. By signing this Contract or providing or causing to be provided a certificate of coverage,the Contractor is representing to the governmental entity that all employees of the Contractor who will provide services on the Project will be covered by workers' compensation coverage for the duration of the Project,that the coverage will be based on proper reporting of classification codes and payroll amounts,and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured,with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties,or other civil actions. K. The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the governmental entity to declare the Contract void if the Contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. END OF SECTION Insurance Requirements ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#4 Phase 1(Project No. E16246) PAGE 10 OF 10 00 73 00 SUPPLEMENTARY CONDITIONS These Supplementary Conditions amend or supplement SECTION 00 72 00 GENERAL CONDITIONS and other provisions of the Contract Documents. All provisions not amended or supplemented in these Supplementary Conditions remain in effect. The terms used in these Supplementary Conditions have the meanings stated in the General Conditions. Additional terms used in these Supplementary Conditions have the meanings stated below. ARTICLE1—DEFINITIONS AND TERMINOLOGY SC-1.01 DEFINED TERMS A. Delete the last sentence in Paragraph 1.01.A.26 and replace with the following: "Designers are Licensed Professional Engineers, Registered Architects,or Registered Landscape Architects qualified to practice their profession in the State of Texas." B. The members of the OPT as defined in Paragraph 1.01.A.41 consists of the following organizations: City of Corpus Christi,Texas LNV, Inc. Paragraph 1.01.A.54"Substantial Completion"is more specifically defined for this Project as: 1. The following items are complete in accordance with the Contract Documents: a. 95%of the Contract Total Quantity of Dry Tons has been removed from the Project Site 2. Only the following items not yet complete in accordance with the Contract Documents: a. Remaining 5%of the Contract Total Quantity of Dry Tons,Site cleanup, demobilization, record drawings,as applicable, Final punchlist, Final Pay Request and Final Closeout documentation. ARTICLE 4—COMMENCEMENT AND PROGRESS OF THE WORK SC-4.04 DELAYS IN CONTRACTOR'S PROGRESS A. The allocation for delays in the Contractor's progress for rain days as set forth in General Conditions Paragraph 4.04.D are to be determined as follows: 1. Include rain days in developing the schedule for construction. Schedule construction so that the Work will be completed within the Contract Times assuming that these rain days will occur. Incorporate residual impacts following rain days such as limited access to and within the Site, inability to work due to wet or muddy Site conditions,delays in delivery of equipment and materials,and other impacts related to rain days when developing the schedule for construction. Include all costs associated with these rain days and residual impacts in the Contract Price. Supplementary Conditions ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#5 Phase 1(Project No. E16246) PAGE 1 OF 3 2. A rain day is defined as any day in which the amount of rain measured by the National Weather Services at the Power Street Stormwater Pump Station is 0.50 inch or greater. Records indicate the following average number of rain days for each month: Month Days Month Days January 3 July 3 February 3 August 4 March 2 September 7 April 3 October 4 May 4 November 3 June 4 December 3 3. A total of 43 rain days have been set for this Project. An extension of time due to rain days will be considered only after 43 rain days have been exceeded during the execution of this project and the DAR has determined that a detrimental impact to the construction schedule resulted from the excessive rainfall. Rain days are to be incorporated into the schedule and unused rain days will be considered float time which may be consumed by the Owner or Contractor in delay claims. ARTICLE 5—AVAILABILITY OF LANDS;SUBSURFACE CONDITIONS AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS SC-5,03 SUBSURFACE AND PHYSICAL CONDITIONS 1. None 2. None A. No reports of explorations or tests of subsurface conditions at or contiguous to the Site, or drawings of physical conditions relating to existing surface or subsurface structures at the Site,are known to Owner." "5.06 Hazardous Environmental Conditions at Site A. No reports of explorations or tests for Hazardous Environmental Conditions at or contiguous to the Site are known to Owner." ARTICLE 7—CONTRACTOR'S RESPONSIBILITIES SC-7.02 Replace Paragraph 7.02 in its entirety with the following: SC-7.02 Labor; Working Hours A. Provide competent, suitably qualified personnel to survey and lay out the Work and perform Work to complete the Project. Maintain good discipline and order at the Site. B. Perform Work at the Site during regular working hours except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent to the Site and except as otherwise stated in the Contract Documents. C. Coordinate work on legal holidays with the OAR, Plant, and the Landfill a minimum of 4 calendar days before the observed holiday. Do not perform work on a SaWF:day,96IR Jam" Supplementary Conditions ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#5 Phase 1(Project No. E16246) PAGE 2 OF 3 a-r legal holiday without OAR's and Plant's consent. The following legal holidays are observed by the Owner: Holiday Date Observed New Year's Day January 1 Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Thanksgiving Day Fourth Thursday in November Friday after Thanksgiving Friday after Thanksgiving Christmas Day December 25 D. If a legal holiday falls on a Saturday, it will be observed the preceding Friday. If a legal holiday falls on a Sunday, it will be observed the following Monday. F. Dredizing and dewatering operations shall be permitted to occur 24 hours per day and 7 days per week iziven that the eauioment and operations comply with the Code of Ordinances, City of Corpus Christi,Texas, Part III,Chapter 31 (Ord. No.027440. § 1. 10-9- 2007 . G. Hauliniz operations shall be limited to arriving at Cefe Valeniuela landfill between the hours of 7:00 a.m. and 5:00 p.m. Monday through Friday and between 11:00 a.m. and 5:00 p.m. on Saturday. No hauling will be permitted on Sunday. Hauliniz during leizal holidays shall be coordinated with Cefe Valenxuela Landfill a minimum of 4 calendar days before the observed holiday. SC-7.04 CONCERNING SUBCONTRACTORS, SUPPLIERS,AND OTHERS A. Add the following sentence to the end of Paragraph 7.04.A: "The Contractor must perform at least[50] percent of the Work, measured as a percentage of the Contract Price, using its own employees." END OF SECTION Supplementary Conditions ADDENDUM#3 0.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#5 Phase 1(Project No. E16246) PAGE 3 OF 3 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT 1.00 GENERAL 1.01 MEASUREMENT AND BASIS FOR PAYMENTS ON LUMP SUM ITEMS A. Include all cost for completing the Work in accordance with the Contract Documents for lump sum payment items. Include all direct cost for the Work associated with that lump sum item and a proportionate amount for the indirect costs as described in SECTION 0129 00 APPLICATION FOR PAYMENT PROCEDURES for each lump sum item. Include cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the lump sum price. B. Measurement for progress payments will be made on the basis of the earned value for each item shown as a percentage of the cost for the lump sum item as described in SECTION 0129 00 APPLICATION FOR PAYMENT PROCEDURES. Payment at Final Completion will be equal to the total lump sum amount for that item. 1.02 MEASUREMENT AND BASIS FOR PAYMENTS ON UNIT PRICE ITEMS A. Include all cost for completing the Work in accordance with the Contract Documents in unit price payment items. Include all direct cost for the Work associated with that unit price item and a proportionate amount for the indirect costs as described in SECTION 0129 00 APPLICATION FOR PAYMENT PROCEDURES for each unit price item. Include cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the unit price. B. Measurement for payments will be made only for the actual measured and/or computed length,area,solid contents, number,and weight, unless other provisions are made in the Contract Documents. Payment on a unit price basis will not be made for Work outside finished dimensions shown in the Contract Documents. Include cost for waste, overages, and tolerances in the unit price for that line item. Measurement will be as indicated for each unit price item. 1.03 MEASUREMENT AND BASIS FOR PAYMENT FOR BASE BID ITEMS A. Bid Item A-1-Mobilization: This Bid Item will include all costs associated with mobilizing in order to perform the Scope or Work. 1. Include the following costs in this Bid item: a. Bonds and insurance; b. Transportation and setup for equipment; c. Transportation and/or erection of all field offices,sheds, and storage facilities; d. Salaries for preparation of documents required before the first Application for Payment; e. Salaries for field personnel assigned to the Project related to the mobilization of the Project; Measurement and Basis for Payment ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#6 Phase 1(Project No. E16246) PAGE 1 OF 2 f. Installation of any permanent or temporary utilities or access improvements required to perform the Scope of Work. g. Demobilization;and h. Mobilization may not exceed seven and one half percent(7.5%)of the total Contract Price. 2. Measuring for payment is on a lump sum basis. Payment for mobilization will be based on the earned Value of Work completed. B. Bid Item A-2—Dredge, Dewater,and Haul Residuals: 1. This item shall include but not be limited to all work and materials to;furnish dredge equipment,furnish and install turbidity protection for washwater return pump station, furnish and install dewatering equipment, polymer injection equipment, residual and polymer containment areas as required,filtrate return provisions,trucks,fuel,truck maintenance, maintenance of access, electrical feed for dewatering equipment, permits, licenses and certifications as required,and residual analytical testing)as per specification,Complete in Place per Dry Ton. 2. Measuring for payment is on a dry ton (DT) basis. Payment for this bid item will be based on the earned Value of Work completed as described and calculated in specification section 46 76 11-Dredging Dewatering and Hauling. C. Bid Item A-3—Aquatic Vegetation Removal: 1. Included in this Bid Item will be all costs for materials, labor, and equipment required to remove and dispose of the aquatic vegetation existing in Lagoon#7. 2. Measuring for payment is on a lump sum basis. 1.04 MEASUREMENT AND BASIS FOR PAYMENT FOR ALTERNATES AND ALLOWANCES(NOT USED) 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Measurement and Basis for Payment ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#6 Phase 1(Project No. E16246) PAGE 2 OF 2 01 35 00 SPECIAL PROCEDURES 1.00 GENERAL Work shall be completed within the specified time for these items: Description Time Milestone#1=3,000 Dry Tons(DT) Removed 130 Days Milestone#2==6,000 DT Removed 230 Days Milestone#3=Substantial Completion =9,500 DT Removed 365 Days Milestone#4=Final Completion= 10,000 DT Removed 395 Days A. Consider the sequences,duration limitations, and governing factors outlined in this Section to prepare the schedule for the Work. B. Perform the Work not specifically described in this Section as required to complete the entire Project within the Contract.Times. 1.02 PLAN OF ACTION A. Submit a written plan of action for approval shuttinesseRtial sepgiees. T��se 4. GQ-R;-M-'61RiGatiGRS equipment, and -5. n+hs-r da&0gRat6d fWWA404 B. Describe the following in the plan of action: 1. Scheduled dates for construction; 2. Work to be performed; 3. Utilities, piping, or services affected; 4. Length of time the service or utility will be disturbed; 5. Procedures to be used to carry out the Work; 6. Plan of Action to handle emergencies; 7. List of manpower,equipment,and ancillary supplies; 8. Backups for key pieces of equipment and key personnel; 9. Contingency plan that will be used if the original schedule cannot be met; and C. Submit plan 1 month prior to beginning the Work. Special Procedures ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#7 Phase 1(Project No. E16246) PAGE 1 OF 3 1.03 CRITICAL OPERATIONS A. The Owner has identified critical operations that must not be out of service longer than the designated maximum time out of service and/or must be performed only during the designated times. These have been identified below: Lagoon#7 (Washwater Return Basin)may not be taken out of service for any period of time. B. Submit a written plan of action per Paragraph 1,02 for approval for critical operations. C. Work affecting critical operations is to be performed on a 24-hour a day basis until Owner's normal operations have been restored. D. Provide additional manpower and equipment as required to complete the Work affecting critical operations within the allotted time. E. Liquidated damages will be assessed if Work on critical operations is not completed within the time indicated. 1. These items are critical to the operation of the O.N.Stevens Water Treatment Plant. 2. Loss of operation of the O.N. Stevens Water Treatment Plant can subject the Owner to loss of revenue, additional operations cost,and fines from regulatory agencies. 3. Liquidated damages have been established for each critical operation. 4. In lieu of liquidated damages,the Owner may terminate the Agreement in accordance with Article 16 of section 00 72 00 General Conditions if the milestone dates are not met. F. Designated Critical Operations are described in more detail as follows: 1. Critical Operation 1-Milestone#1=Remove 3,000 Dry Tons: a. It is critical for plant operations that the residuals existing in Lagoon#7 be removed as quickly as possible. Failure of Contractor to remove 3,000 DT or more in the Contract Time established for Milestone#1 will result in proceedings by the Owner to terminate the Agreement. The Contractor will have 7 days, as provided under section 00 72 00 General Conditions Article 16.02,to cure the cause for termination at which point the Owner may elect not to proceed with the termination, if the cause has been sufficiently cured in the opinion of the Owner. 2. Critical Operation 2-Milestone#2=6,000 Dry Tons Removed: a. It is critical for plant operations that the residuals existing in Lagoon#7 be removed as quickly as possible. Failure of Contractor to remove 6,000 DT or more in the Contract Time established for Milestone#2 will result in proceedings by the Owner to terminate the Agreement. The Contractor will have 7 days, as provided under section 00 72 00 General Conditions Article 16.02,to cure the cause for termination at which point the Owner may elect not to proceed with the termination, if the cause has been sufficiently cured in the opinion of the Owner. Additionally,failure by the contractor to meet Milestone #1 does not change the calendar day requirement to meet Milestone#2. Special Procedures ADDENDUM#3 O.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#7 Phase 1(Project No. E16246) PAGE 2 OF 3 3. Critical Operation 3 -Milestone#3= Substantial Completion: a. It is critical for plant operations that the residuals existing in Lagoon#7 be removed as quickly as possible. Failure of Contractor to remove the final awarded amount of dry tons in the Contract Time established for Milestone#3 will result in proceedings by the Owner to terminate the Agreement. The Contractor will have 7 days,as provided under section 00 72 00 General Conditions Article 16.02,to cure the cause for termination at which point the Owner may elect not to proceed with the termination, if the cause has been sufficiently cured in the opinion of the Owner. Additionally,failure by the contractor to meet Milestone#1 or Milestone#2 does not change the calendar day requirement to meet Milestone#3. 4. Critical Operation 4- Milestone#4= Final Completion: a. It is critical for plant operations that the residuals existing in Lagoon#7 be removed as quickly as possible. Failure of Contractor to remove the final awarded amount of dry tons in the Contract Time established for Milestone#3 will result in proceedings by the Owner to terminate the Agreement. The Contractor will have 7 days,as provided under section 00 72 00 General Conditions Article 16.02,to cure the cause for termination at which point the Owner may elect not to proceed with the termination, if the cause has been sufficiently cured in the opinion of the Owner. Additionally,failure by the contractor to meet Milestone#1, Milestone#2,or Milestone#3 does not change the calendar day requirement to meet Milestone#3. J,84 Q4.I i-R=.l��I�T�IPI;€ A. leakage past ele-sed- valves, gates 9F adjageept st-R-iet-'Fe.-r'. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Special Procedures ADDENDUM#3 0.N.Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#7 Phase 1(Project No. E16246) PAGE 3 OF 3 SECTION 46 76 11 DREDGING, DEWATERING AND HAULING PART1GENERAL 1.01 DESCRIPTION This specification shall govern the furnishing of all labor, material, equipment, and all work to remove residuals material from Lagoon No. 7, dewater the material as necessary, and haul the material to the landfill, as specified on the drawings. All residuals handling, transporting, and disposal shall comply with TCEQ chapters 315 and 305. All temporary or permanent improvements made to the plant site for the purpose of this contract shall be in compliance with all applicable Federal,State,and local regulations. The Contractor shall provide the appropriate documentation of compliance upon request from the City or Engineer. The initial base contract will be for a one (1) year (12-calendar months) and approximately $4M with one (1) optional one (1) year (12-calendar months) renewal for an additional $4M based on Contractor's successful performance, approval by the City/Engineer and concurrence from the Contractor. The total estimated quantity of residuals to be removed during the base contract is 10,000 dry tons (DT). A dry ton (DT) for the purpose of this contract is defined as 2.000 U.S. pounds of material at 100% total solids content(0% moisture content). 1.02 SUBMITTALS A. Minimum requirements for projects to be considered equal to or greater are as follows: 1. Five (5) projects in the past five (5) years in which the Contractor dewatered and hauled and/or dredged 30 dry tons (DT) per day or 10,000 DT per year of water treatment plant residuals. 2. One (1) project must be submitted that demonstrates project experience dewaterina aluminum sulfate(Alum)residuals. The one(1)alum project required may be included in the five (5) projects required above or may be submitted in addition to the five (5) projects required above for the sole purpose of demonstrating experience with Alum residuals. B. Include the following, per Section 00 45 16 STATEMENT OF EXPERIENCE §§5.01., with the Bid. All documents listed below should be submitted in a format in accordance with Article 4 of the STATEMENT OF EXPERIENCE. 11x17 sheets should be used for the Site Exhibit and Proposed Schedule 1. Site Exhibit The Site Exhibit should convey as much information about the strategy to complete the Scope of Work as graphically possible. The Work Plan Narrative and Site Exhibit are complimentary to each other and information shown in one does not need to be repeated in the other but discrepancies between the two should be avoided. 2. Work Plan Narrative The Work Plan Narrative should describe the methods, equipment, materials, personnel and schedule proposed by the Contractor to achieve the Project's Scope of Work. The purpose of the Work Plan Narrative is to add operational and process 46 76 11-1 0_N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 ADDENDUM#3 ATTACHMENT#S PAGE 1 OF 35 detail to the Site Exhibit that cannot be conveyed graphically. The Work Plan Narrative should be limited to no more four(4) pages. 3. The following information should be included in either the Site Exhibit or the Work Plan Narrative: a. Mobilization and Placement of Dredging, Dewatering, and Hauling Equipment including: 1) Types, capacity, and quantity of dredges 2) Method for removing aquatic vegetation (cattails). 3) Plan for deployment of dredge into pond (crane required)? 4) Mobilization schedule 5) Proposed site footprint 6) Proposed method, equipment, and duration for removing cattails b. Dredging Operation Plan 1) Provisions for protecting Liner 2) Anticipated dredge rate and working hours 3) Redundancy or provisions for equipment failure 4) General pattern of progression of residual removal inside Lagoon#7 C. Dewatering Operation 1) Types, capacity, and quantity of dewatering equipment 2) Deployment and footprint of dewatering equipment 3) Configuration of dewatering equipment, piping,tanks, etc. 4) Footprint of polymer feed equipment 5) Flow control/buffer between dredge and dewatering equipment including type, capacity, and quantity of attenuation basins/tanks (if required). 6) Configuration of dewatering equipment discharge (i.e. pipes, conveyors, cake receiving containers, cake stockpile area, etc.) 7) Containment details for dewatering and stockpile area. 8) Configuration of filtrate return equipment including attenuation tanks, pumps, hose routing, discharge location, etc. (as applicable). d. Hauling Operation 1) Capacity, quantity, and type of truck. 2) Capacity, quantity and staging footprint of roll-off containers or other hauling containers,trailers or trucks. 3) Proposed site ingress and egress. Ingress and egress from Hearn Road is available. Describe improvements to access points or staging area, if needed(subsidiary to unit price per dry ton). 46 76 11-2 ❑_N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 ADDENDUM#3 ATTACHMENT#S PAGE 2 OF 35 4) Proposed load sampling location 5) Proposed route to and from final disposal site (Cefe Valenzuela Landfill or other). 6) Estimate of anticipated total number of loads required and number of loads per day. e. Any unique or significant equipment, processes, or procedures that are not listed above. THE SUBMITTALS DESCRIBED IN THE REMAINDER OF SECTION 1.02 ARE CONSTRUCTION SUBMITTALS AND ARE NOT DUE TO BE SUBMITTED WITH THE BID. CONSTRUCTION SUBMITTALS ARE DUE AFTER CONTRACT AWARD AND BEFORE EXECUTION OR IMPLEMENTATION OF ANY OF THE WORK ASSOCIATED WITH EACH RESPECTIVE SUBMITTAL. C. Dredge Equipment: Contractor shall provide specific information on equipment to be used to perform dredging. Include equipment manufacturer, model number, type of dredge head, positioning system, and performance characteristics. Also include recent photographs of equipment. The dredge equipment submittal shall be delivered to the Engineer for review no later than fourteen (14) calendar days after the issuance of the Notice of Award Letter. Engineer shall notify contractors of equipment approval in accordance with the General Conditions. The City reserves the right to disallow, at any time, the operation or use of any equipment component that it deems inadequate to perform the work within the specified contract time, or that could potentially compromise the public water supply in any way, or that does not meet the noise ordinance criteria stipulated in 3.05 F. 'A"i*th the-d-ata Sf�cIAIR Q-121thedra`A''iRgs.Refer to p ph n 04 A. E. Dewaterina Eauipment: Contractor shall provide specific information on equipment to be used to perform dewatering. Include equipment manufacturer, model number, and performance characteristics. Also include recent photographs of equipment. F. Polymer: Contractor shall provide specific information on polymer to be used. Include manufacturer,trade name, MSDS, and proof of NSF certification. G. Polymer Feed Station: Contractor shall provide specific information on equipment to be used in the polymer feed station. Include list of major components (tanks, metering pumps, mixers with manufacturer, model number, and performance characteristics. Also include recent photographs of equipment. H. Trucks and Containers: Contractor shall provide specific information on equipment to be used for hauling. Include equipment manufacturer, model number, gross vehicle weight rating (GVWR),and current registrations, inspections,and certifications. Include recent photographs of equipment. Also include the Unique Truck/Container ID key in accordance with section 3.08C.1.I. I. Turbidity Curtain: Contractor shall submit product information for the proposed turbidity curtain meeting the requirements of section 3.07. C. 46 76 11-3 0_N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 ADDENDUM#3 ATTACHMENT#S PAGE 3 OF 35 J. Percent Solids Sampling Plan: Contractor shall submit a percent solids sampling plan describing method of obtaining representative samples for each load, making daily composite sample, preserving sample(s) for testing and schedule of delivery of samples and receipt of laboratory testing results. K. Testin❑ Laboratory: Contractor shall submit the name, physical address, and contact information of their proposed testing laboratory,for approval. If separate labs are proposed to be used for the percent solids testing and TCLP/TPH testing Contractor shall submit the required information for both laboratories. L. Pipeline Map: Prior to commencing dredging operation, provide a site map showing all pipelines, including pipeline routing and crossings, and location of dredge/residual discharge point. Contractor to provide piping protection at all road crossings. Include any existing utilities and protection. M. Notification: The Contractor shall notify the City Water Department or Plant Staff in writing, at least ten (10)days prior to setup of any dredge equipment directly in the lagoons, or to request water level adjustments in the lagoons. N. Daily Activity Reports: During the dredging operation, provide a daily record of activities occurring at the lagoon(s), and disposal site. Submit daily reports to the Engineer on a weekly basis. Refer to paragraph 3.09.A. O. Spill Continctencv Plan: Prior to commencing dredging operation, provide a Spill Contingency Plan. Refer to paragraph 3.08.13. P. Monthly Operations Report: Upon submittal of the monthly invoice the Contractor shall submit a Monthly Operations Report that shall be in accordance with section 3.09.13: 1.03 {QUALITY ASSURANCE A. Permits: The Contractor shall comply with all conditions and requirements of Federal, State, and local regulations and specifically with TCEQ Chapters 312 and 305. There shall be no discharge of dredged material or water from City property or outside of the drainage area of the lagoon. B. Environmental Protection Requirements: Provide and maintain environmental protection measures during the entire construction period. Comply with all Federal, State, and local regulations pertaining to water, air, and noise pollution. C. Public Water Supply Protection Requirements: Protection of the public water supply is essential. Prevent fuels, hydraulic fluid, lubricating oils, and any other contaminants from entering the lagoons. Provision to protect the public water supply should be prominent in the Spill Contingency Plan provided by the Contractor. PART2PRODUCTS 2.01 DREDGEIRESIDUALS MATERIAL A. Lagoon Material: Any and all material (unclassified)that currently exists within the lagoons. B. Objectionable Material: Material such as rocks, cable, trees, tires, concrete, debris, etc. shall not be deposited or temporarily stored anywhere within the site. This material shall become property of the Contractor and be removed from the project site and disposed of in accordance with all applicable laws and ordinances. C. Aquatic Vegetation: Any aquatic vegetation existing near the surface of the lagoon and specifically cattails. 46 76 11-4 ❑_N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 ADDENDUM#3 ATTACHMENT#S PAGE 4 OF 35 PART 3EXECUTION 3.01 LAGOON PREPARATION A. Verification of Conditions: Prior to setup of dredge equipment within the lagoons, verify that existing conditions are consistent with the drawings. Immediately notify the Engineer should there be any discrepancies. B. Removal of Aquatic Veaetation: Removal of all aquatic vegetation (cattails, etc.) will be required. All aquatic vegetation shall be removed to facilitate dredging and in a way that prevents damage to the embankment of the lagoons). The aquatic vegetation removed from the lagoon may be disposed of at the Pollywog Ponds disposal site. Method of vegetation removal is to be determined by the Contractor and submitted to the Engineer for approval. 3.02 DREDGE EQUIPMENTISETUP A. Dredge Equipment: Equipment utilized to remove residuals material from the lagoons shall have the following minimum features and characteristics: 1. Dredge positioning system (cable drive or self-propulsion)without spuds. 2. Skids or other protection device at dredgehead to prevent damage to clay liner and slopes of lagoons. 3. Electric or hydraulically powered. All hydraulic fluid shall be biodegradable. No combustion engines shall be permitted within the lagoons unless specifically equipped with satisfactory spill containment to ensure that fuel does not leak into the public water supply. 6. Emergency Spill Response Equipment: Prior to commencing dredging operation,sufficient spill response equipment, i.e. boom, etc. shall be on-site and ready for deployment in the event of an emergency or accident. C. Water Level Adjustments: At the Contractor's request and at the City's discretion, the water level in the lagoons may be adjusted to support the dredging operation. The City has limited ability to add or remove water at the lagoons therefore arrangements must be made 72-hours in advance of the starting of removal/dredging operations if adjustments are required. The City and plant operators have full discretion as to whether the water level adjustments can be facilitated or not. D. Setup:The dredge, pipelines,and associated equipment shall be of a size sufficient to perform the work and shall be kept in condition for efficient production. E. Turbidity Curtain:A turbidity curtain shall be installed by the contractor around the lagoon pump intake to prevent turbid water from entering the decant water pumping system. 3.03 DREDGING OPERATION A. General: Dredging shall be performed by mechanical or hydraulic methods or other method authorized by the Engineer. B. Dredge Cut Tolerance: Plus or minus 0.50 feet. C. Protection of Existing Embankment and Lagoon Appurtenances: Use care in prosecuting the work to assure the side slopes of embankments,clay liner, bottom, and other structures within the lagoons are not jeopardized by dredging. Repair any damage resulting from the dredging operation to the satisfaction of the City and at the expense of the Contractor. 46 76 11-5 ❑_N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 ADDENDUM#3 ATTACHMENT#S PAGE 5 OF 35 3.04 DREDGEIRESIDUALS DISCHARGE A. General: Dredge/residuals material shall be pumped or otherwise conveyed to the staging/dewatering area identified by the Contractor. Material shall not be deposited or allowed to flow into any stream tributary, existing drainage outlet ditch, canal, water intake, or outlet facility; nor shall materials be allowed to flow onto any improved areas in or adjacent to the disposal site. The Contractor shall promptly remove any spilled material and shall place it in the disposal site. B. Pipelines: The use of pontooned or submerged sections of the dredge pipeline shall not interfere with the normal operation of the lagoons). C. Unauthorized Disposal of Material: Dredged/residuals material may not be deposited anywhere on site other than being temporarily held and contained in a designated stockpile area or tank. During the progress of the work,the Contractor shall not deposit worn out discharge pipe, wire, rope, scrap metal, timbers, or any other such type of rubbish or obstructive material on site. Such material,together with any scrap, rope, wire cable, piles, pipe, or any other obstructive material which may be encountered during the dredging operations, shall be properly disposed of by the Contractor in accordance with state and federal regulations. 3.05 RESIDUALS DEWATERING A. Dewatering of residuals is required,as necessary to pass the paint filter test, before hauling to a permitted municipal solid waste landfill. B. Contractor will be responsible to select the means of dewatering and submit the proposed equipment to the Engineer for approval. C. The use of a NSF approved polymer is allowed as necessary to facilitate dewatering. D. Other than polymer, addition of any other material that would change the chemical or physical properties of the dewatered residuals is prohibited unless otherwise approved by the Engineer. E. Any dewatering operation and equipment shall be sufficiently contained to prevent a spill or discharge of wet or dewatered material into any stream tributary,existing drainage outlet ditch, canal, water intake, or outlet facility; or any improved areas in or adjacent to the site. The Contractor shall promptly remove any spilled material and return it to the removal process for ultimate disposal at the disposal site. F. Dredging and dewatering operations shall be permitted to occur 24 hours per day and 7 days per week aiven that the eauipment and operations comply with the Code of Ordinances, City of Corpus Christi, Texas, Part III, Chapter 31 (Ord. No. 027440, 4 1, 10- 9-2047). A portion of the applicable ordinance is provided below for reference. "It shall be unlawful for any person to conduct, permit,allow,or produce a sound that is discernable beyond the property lines of the property on which the sound is being produced that,when measured with a sound level meter using the standardized frequency weighting as specified by the American National Standards Institute, exceeds the applicable dB(A) level listed below for the property on which the sound is received: (1) Seventy (70) dB(A) between the hours of 8:01 a.m. and 11:00 p.m. Sunday through Thursday and between the hours of 7:01 a.m. and 12:00 midnight on Friday and Saturday. (2)Sixty(60)dB(A) between the hours of 11:01 p.m.and 8:00 a.m.Sunday through Thursday and between the hours of 12:01 a.m. and 7:00 a.m. on Friday and Saturday and between the hours of 12:01 a.m. and 8:00 a.m.on Sunday. 46 76 11-6 ❑_N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 ADDENDUM#3 ATTACHMENT#8 PAGE 6 OF 35 (3) Eighty-five (85) dB(A) for sound that both originates from and is received on property within the Entertainment District, at all times." G. If the dredging or dewater equipment does not comply with the City's noise ordinance as referenced herein, the dredging and dewatering operation will be limited to normal plant business hours (between the hours of 7 a.m. and 6:00 p.m. Monday through Friday). 3.06 HAULING A. Regulatory Compliance: All vehicles and hauling containers must comply with Federal, State, and local regulatory requirements. Specifically,TCEQ chapters 312 and 305 shall be complied with at all times, as applicable. B. All hauling vehicles shall comply with the weight limits established by the Texas Department of Motor Vehicles for each vehicles respective axle combination. C. Trip Tickets complying with TCEQ Chapter 312 shall be submitted to the Engineer for each load hauled from the project site. Trip Tickets shall be submitted on a weekly basis. An example Trip Ticket is provided herein as Attachment A for Contractor's reference and use. Trip Tickets must be retained for a period of five (5) years and be made available to TCEQ upon request. D. All Haulers and their vehicles must be registered with the City of Corpus Christi. All requirements and necessary forms and fees are detailed in Attachment B to this specification. No tipping fee will be imposed on any Hauler in association with the work of this contract. Hauler and Vehicle registration fees specified in Attachment B are applicable and required. E. Haulinq operations shall be limited to arriving at Cefe Valenxuela landfill between the hours of 7:00 a.m. and 5:00 p.m. Monday through Friday and between 11:00 a.m. and 5:00 p.m. on Saturday. No hauling will be permitted on Sunday. F. Upon departure from the project site, each truck must be sampled for percent solids and paint filter test by the Contractor in accordance with section 3.08.C. Paint filter test at the project site will be conducted by the Contractor for the Contractors reference and to ensure the load will be accepted at the landfill. G. Upon arrival at the disposal site, each truck will be sampled for paint filter test by landfill staff. This will be the official paint filter test and will determine whether the load is acceptable to the landfill or not. H. The Contractor will use the scales provided at the landfill for Gross Weight and Tare Weight measurements. The loads net weight will be calculated as Gross Weight minus Tare Weight. I. Upon the landfills acceptance of the load based on the paint filter test, the landfill will provide direction as to the area for the load to be deposited. J. Contractor shall be responsible to prevent spillage and tracking and will be responsible for remediating,cleaning and restoring any areas on which spillage or tracking occurs. K. Contractor shall be responsible for any site improvements required to accommodate the hauling operation such as entrances, driveways, etc. Contractor shall also be responsible to maintain site access surfaces in a condition acceptable to their hauling operation. All access improvements or maintenance are considered subsidiary to the unit cost per dry ton. 46 76 11-7 0_N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 ADDENDUM#3 ATTACHMENT#8 PAGE 7 OF 35 3.07 SITE MANAGEMENT A. Monitoring: The Contractor shall have constant monitoring of the pipelines and designated dewatering site during dredging operations. The personnel monitoring shall be in radio contact with the dredge at all times. The Contractor shall expand radio contact to include a designated City representative for emergency response purposes. B. Laaoon Embankments/Levees: The Contractor shall prevent damage to any existing embankment/levee. Any damage shall be repaired at the Contractor's expense. C. Washwater Return Pump Station Protection/Turbidity Curtain: Contractor shall provide a turbidity curtain or other form of protection from turbidity and sedimentation as approved by the Engineer,for the Washwater Return Pump Station and as indicated on the plans. 1. Lines,tie-downs and anchors shall be installed per manufacturer's recommendations. {Generally, a Type II permeable turbidity curtain (for currents up to 1 knot or 1.69 feet per second) is sufficient for this application. Turbidity curtains that have been previously used in other water bodies must be properly cleaned to prevent the spread of invasive exotic species from other sites. If any materials (including turbidity curtains, bouys and chains) have been previously used,they shall be disinfected with vinegar or cleaned with hot water greater than 104 deg. F then allowed to completely dry for a minimum period of five days. If there are any questions about the occurrence of zebra mussels (Dreissena polymorpha), Giant salvinia (Salvinia molests), or other aquatic invasive species in a waterbody that you have worked in, are working in, or intend to work in, contact the Texas Parks and Wildlife Department. The remainder of section 3.07.0 is adapted from TxDCT Special Specification 5538 (2004). 2. Materials: The floating turbidity barrier supplied shall be a standard manufactured product. All materials shall be corrosion resistant. Materials at the water surface shall not degenerate when exposed to sunlight, oils, and petroleum products. The manufacturer shall supply a certification that the product supplied meets the requirements of this specification. The floating turbidity barrier consists of a PVC coated nylon section and a geosynthetic barrier/curtain section, load line, mooring lines, adjustment lines and tie-downs, floatation, ballast, anchors, mooring buoys, and lighted buoy. a. Turbidity Barrier/Curtain: The Turbidity Barrier/curtain geosynthetics shall have the following properties: • The top section shall consist of an 18-22 oz. per square yard PVC coated nylon fabric. It shall be a bright yellow or orange color to be easily seen. • The curtain material shall consist of a tightlywoven monofilament yarn filter fabric as specified below: Property ASTM Test Method Value Weight ASTM D-4632 6.2 oz/sq. yd Tensile Strength ASTM D-4632 390 x 280 lbs 46 76 11-8 0_N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 ADDENDUM#3 ATTACHMENT#8 PAGE 8 OF 35 Trapezoidal Tear Strength ASTM D-4533 100 x 60 lbs Burst Strength ASTM D-3786 530 psi Puncture Strength ASTM D-3787 140 lbs Elongation ASTM D-4632 25% UV Resistance ASTM D-4355 90% Retained E.D.S. *CW-02215 70 US Standard Sieve *US Army Corps of Engineers Civil Works Construction Guide Specification CW-02215,"Plastic Filter Fabric.' • Be a woven material such that the equivalent opening size, E.O.S., cannot be enlarged under pressure or by being snagged. b. Floatation: Turbidity barrier/curtain floatation material shall be a closed cell solid foam material which has sufficient buoyancy to provide the curtain with continuous support, and a minimum of 6 inches freeboard. The sections of floatation shall be installed such that they cannot move along inside the sleeve and the space between sections shall not be more than twice the thickness of the floatation material. C. Load Lines: Load lines shall be minimum 114 in to 5116 in. vinyl coated galvanized aircraft cable with 9800 Ib. breaking strength. The load line shall have galvanized connectors with tool free disconnect. d. Mooring Lines: Adjustment lines shall be minimum 112 in. nylon rope. e. Adjustment Line Tie-Downs: Adjustment lines and tie down lines shall be minimum 112 in. nylon rope. f. Ballast: Ballast shall be minimum 114 in to 5116 in. galvanized steel chain. g. Anchors: Turbidity barrier/curtain anchors shall have a sufficient mass and spaced to secure the barrier as recommended by the manufacturer depending on the current velocities. Expected current velocity is less than 0.5 feet per second. h. Mooring Buoys: Mooring buoys shall have provisions for the mooring line to be securely attached and be sufficiently buoyant to remain afloat under normal load conditions. i Lighted B oy; Lighted B gys shall he mane ifart,-red salf_ mtainarl b,-GY6 with ai itam stir flashing lights (nn at dusk, nff at dawn)installed at 1 DO ft nn ranter algAg the G iter navigable rhannal 3. Construction: Construction methods,workmanship,equipment and materials used hall conform to the various items of the standard specifications which govern the items of work to be performed under this contract and as specified on the plans. Place the barrier prior to commencement of any work that could impact the area of concern. Ensure that the type of barrier used and the deployment and maintenance of the barrier will minimize dispersion of turbid water from the excavation and dredging area. Operate the turbidity barrier in such a manner to avoid or minimize the degradation of the water quality of surrounding waters. 46 76 11-9 0_N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 ADDENDUM#3 ATTACHMENT#S PAGE 9 OF 35 The barrier shall have sufficient ballast to anchor the barrier along the channel bottom. The Contractor will immediately repair or replace defective or damaged portions of the turbidity curtain. The turbidity curtain will remain in place until such time that water contained within is free from turbidity. The curtain shall be removed within 72 hours after this determination has been made. If required,the area behind the turbidity curtain will be cleaned prior to removal. D. Spill control, SWPPP, and storm water permits and regulations are to be complied with by Contractor and costs are subsidiary to the unit price per dry ton. 3.08 QUALITY CONTROL A. General: The Contractor shall establish and maintain a quality control system for dredging operations to assure compliance with the contract requirements and record the inspections and tests under this system, including but not limited, discharge effluent and spillage from the dredging equipment into the lagoons. B. Spill Contingency Plan: The Contractor shall provide and maintain an effective dredge spill contingency plan that includes the following as a minimum. 1. The Contractor shall identify and have available the names and phone numbers of companies having portable hydraulic dredges or vacuum pumps ready to clean up any dredge/residuals material discharged from the site. 2. The Contractor's Dredge Spill Contingency Plan shall include the following procedures to be followed in the event of an emergency or accident: a. The dredge shall cease operations immediately. b. The Contractor shall immediately notify the City, Water Division, or the designated City representative via radio contact or cell phone. C. Contractor shall submit a specific clean-up plan to the City for approval. No clean-up actions will commence until the plan has been approved. All clean- up of misplaced or spilled material shall be at the Contractor's expense. C. Dewatered Residuals Samolin❑ and Testina: Contractor shall sample and test the residuals removed from the lagoons and hauled to the disposal site according to the schedule below. Description Sampling Test Method Testing Frequency Frequency Percent Every Load Standard Method 2540G (or EPA Daily Composite Solids Method 1684 or 0160.3 if 254OG is not available from lab). Paint Filter Every Load EPA Method 90956 Every Load (once by Test Contractor and once by landfill TCLP Every EPA Method 1311 Every 25,000 CY 25,000 CY TPH Every TCEQ Method 1005 Every 25,000 CY 25,000 CY 467611-10 0_N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 ADDENDUM#3 ATTACHMENT#8 PAGE 10 OF 35 1. Percent Solids: CONTRACTOR shall make a daily composite sample of residuals transported from the facility which is comprised of individual representative samples taken from each truck leaving the site on a given day. Percent solids test results shall be reported to the Engineer daily. a. The sample(s) shall be stored throughout the day in airtight containers and in a manner that will preserve the integrity of the samples). b. The daily composite sample shall be tested by an independent laboratory, contracted by and paid for by the CONTRACTOR, to determine percent total solids (%TS)of the dewatered residuals. C. Percent total solids content shall be determined following established laboratory procedures as specified in Test 254OG of the most recent edition of "Standard Methods". If the selected laboratory does not perform Standard Method 2540G another method may be requested for Engineer's approval. d. The samples taken to make the composite sample shall be taken directly from the container used for hauling. e. No material is to be added to the container atter the sample has been taken. f. The sample shall be taken from at least four (4) inches below the top surface of the residuals in the load and shall not be taken from within four (4) inches of any perimeter of the load (i.e. sides, bottom, top, front, or back of the container). g. All samples taken in a single day shall be of a uniform volume. All samples on any day shall be a minimum volume of 100 mL and no more than 250 mL, or as otherwise directed by the testing laboratory. h. Samples shall not be compressed into containers. Containers shall be overfilled and the lid secured to the overfilled container so as to shed any excess material in the process of securing the lid. i. Samples may be collected using a plastic or metal scoop, plastic or metal coring device, or other tool to facilitate proper sampling. j. Contractor may make the composite sample in one of the following ways: 1) Directly atter each individual truck sample is taken, or 2) Atter the last load of the day has been accepted at the landfill, or 3) May have the lab make the composite sample. In all cases, the composite sample must contain equal volumes of each individual sample and be kept in an air tight container until the time of testing. k. All individual load samples will have a unique sample ID number as detailed below or an alternate unique numbering system as submitted to,and approved by,the Engineer. Sequential Sample Number Starting at 1 for the first load Date(YYYYIMMIDD) Unique TrucklContainer ID# each day. 46 76 11-11 ❑_N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 ADDENDUM#3 ATTACHMENT#S PAGE 11 OF 35 xx- xxxx/xxrxx- xxxx I. The Unique Truck/Container ID is determined by the Contractor for each hauling container. A key showing the Unique ID corresponding the TCEQ registration number shall be submitted to the Engineer for approval and reference. M. Each sample shall also be marked with the time that the sample was taken. n. Each daily composite sample will be labeled with the date corresponding to the date of all samples incorporated into the composite sample. o. The City and Engineer reserve the right to make a split sample of any percent solids samples taken by the Contractor and have them tested to validate results. In the event that the results vary by 5% Total Solids or more the average of the two results will be used for payment of that days load. If deviations of 5% or more occur repeatedly or frequently sampling and testing procedures will be reviewed and adjusted to eliminate the unnecessary introduction of error. 3.09 RECORD OF ACTIVITIES A. Daily Operations Report The Contractor will be required to prepare and maintain a daily summary report of all operations and furnish legible copies thereof to the Engineer. The daily summary report should include information including: 1. Total hours work was performed 2. Total number of each trade on site and approximate hours worked 3. Equipment on-site and in use 4. Weather(beginning temp, ending temp, rain recorded, general description) 5. Total number of loads removed from ONSWTP. 6. Trip Tickets for each load shall be submitted to the Engineer on a weekly basis. B. Monthly Operations Report Upon submittal of the monthly invoice the Contractor shall submit a Monthly Operations Report that shall The Contractor will be required to prepare and maintain a daily summary report of all operations and furnish legible copies thereof to the Engineer. The daily summary report should include information including: 1. All data required for federal, state and local reports, 2. Amount(cost and percentage of total invoice)of work applicable for MWBE goals, 3. Summary of costs including transportation, disposal, equipment maintenance, system operation 4. Total monthly polymer usage in applicable units as purchased from manufacturer. 5. Record of each load hauled for each day in the reporting period, including: a. Gross Weight 467611-12 ❑_N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 ADDENDUM#3 ATTACHMENT#S PAGE 12 OF 35 b. Tare Weight C. Net load weight d. Daily percent solids test results e. Total Dry Tons 6. Any operational issues encountered during the reporting period 7. Reports of analytical testing conducted during the reporting period (including percent solids,TCLP, and TPH) S. All disposal Manifests and Trip Tickets meeting the requirements of TCEQ Chapter 312. 3.10 EQUIPMENT REMOVALIDISPOSAL SITE CLOSURE A. General: Upon completion of the work, promptly remove equipment,including pipelines, buoys, and other markers or obstructions placed by or for the Contractor. PART 4MEASUREMENT AND PAYMENT 4.01 MEASUREMENT C. Measurement of water treatment residuals dredging, dewatering and hauling will be made based on the unit price bid of dry tons of solids removed. Dry tons of solids removed will be measured by multiplying the °/QTS of each days composite sample by the total weight of all loads delivered to the landfill for the corresponding day as reported on the TCEQ Chapter 312 compliant trip tickets. The formula for measurement and payment is provided below. %TS (Daily Composite) x[Gross Weight—Tare Weight (in tons)] = Dry Tons/truck Dry Tons/truck x bid unit price per dry ton = payment to Contractor per truck The monthly invoice amount will be the sum of all payments to Contractor per truck during the respective pay period plus any mobilization or percent complete on any other bid item. D. Mobilization will be measured as specified in section 01 29 01 Measurement and Basis for Payment. E. Aquatic Vegetation Removal will be measure as specified in section 01 29 01 Measurement and Basis for Payment. 4.02 PAYMENT Payment for dredging, dewatering, and hauling shall be on a unit price basis per dry ton (DT)and must be fully substantiated with official measurements(See Section 4.01 Measurement above). All other work, materials, permits,fuel costs,water service, electrical service,turbidity curtain and any 467611-13 0_N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 ADDENDUM#3 ATTACHMENT#S PAGE 13 OF 35 temporary or permanent improvements installed necessary to complete the Scope of Work are considered subsidiary to this pay item. Only Mobilization and Aquatic Vegetation Removal will be paid separately. END OF SECTION 467611-14 ❑_N.Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 ADDENDUM#3 ATTACHMENT#S PAGE 14 OF 35 Attachment A to Technical Specification 46 76 11 Dredging, Dewatering and Hauling Requirements Sample Trip Ticket ADDENDUM#3 ATTACHMENT#S PAGE 15 OF 35 Trip Ticket Number: Name: 0.N.Stevens Water Treatment Plant Address: 13101 Leopard Dr City: Corpus Christi State: TX zip: 78401 Phone: (361)826 1200 Indicate the Waste Type(must check one)and,if applicable,the interceptor(or trap)capacity: o ❑Wastewater Treatment Plant Sludge ❑ Food Service Grease Trap Capacity= (gal-) =� ❑Chemical Toilet Septic/Sewage Holding Tank Capacity Y= (gal.) 0 ❑Wastwater from Sanitary Sewer System ❑ Grit/Mud/Lint/Oil Trap Capacity= (gal.) W ❑� tither(Specify Source and Type of Waste Water Treatment Plant Residuals os DryTons Removed: Date Removed: As the representative for the generator of this waste,I certify that the information provided is true and correct;and that this waste is to be transported to a facility authorized by the Texas Commission of Environmental Quality(TCEQ)to receive these wastes. Printed Name: Signature: Business Name: Address: 0 City: State: zip: Phone: = TCEQ Registration Number: Vehicle License Number:. Tare Weight: Gross Weight: 1%Total Solids Lab Result: G CL DryTons Transported: Date Relinquished: @ As the representative for the transporter of this waste,I certify that the information provided is true and correct;and that this waste was collected H in accordance with Title 30 of the Texas Administrative Code,Chapter 312,Subchapter G. Printed Name: Signature: Note: This section is for documenting transfers of wastes between vehicle operation under the same TCEQ Registration Number. The transfer of waste to any secondary transporter must be at a Type V facility that is either permitted by or registered with the TCEQ. 1.Was this waste transferred to the vehicle identified above from a previous transporter vehicle? G If YES,indicate the previous Manifest/Trip Ticket No.here: 4- = 2. Is his waste being transferred from the vehicle identified above to a different(new)tra nsporter veh icle? IF YES,complete the section below for the vehicle accepting this waste and initiate a new Manifest/Trip Ticket including the new"Transporter @ Info"and the original"Generator Info"(duplication of the generator's signature would not be required). New Manifest/Trip Ticket Number: New Vehicle License Number: Dry Tons Transferred: Transfer Date: As the representative for the transporter receiving this transferred waste,I certify that the information provided is true and correct. Printed Name: Signature: Facility Name: Cefe Valen zuela Landfill Address: 2397 Co Rd 20 City: Robstown State: TX zip: 78380 Phone: (351)826-8035 Check One: Q Disposal Site TCEQ Type I or Type V Permit No.: ❑ Permitted Transfer Station or 0 ❑ Registered Transfer Station TCEQ Registration No.: C W Tare Weight: Gross Weight: 1%Total Solids Lab Result: 7 WDryTons Received: Date Received: Time Received: As the representative for the facility receiving this waste,I certlfy that: The TCEQ has authorized this facility to accept the waste specified under"Generator Info"above,- Th e bove;The water was received by this facility on the date and time indicated;and The waste has been transferred,recycled,or disposed of as required by the TCEQ authorization for this facility. Printed Name: Signature: ADDENDUM#3 ATTACHMENT#8 PAGE 16 OF 35 Attachment B to Technical Specification 46 76 11 Dredging, Dewatering and Hauling Requirements City of Corpus Christi Hauler Permit Requirements REVISION #1 for ADDENDUM #2 ADDENDUM#3 ATTACHMENT#S PAGE 17 OF 35 HAULER PERMITS General Instructions and Information All haulers of solid waste are required to have permits. Permits are valid from October 1st through September 30th of each year. There are two classifications of solid waste haulers affected by the permitting process and they are as follows: ■ Permitted Solid Waste Self-Hauler & Landscaper: Any person, business, commercial establishment, or industrial facility, other than a residential customer that collects, transports, or disposes of solid waste generated by the person, business, commercial establishment, or industrial facility, who has a solid waste hauler permit issued under Article VIII of the ordinance. Permit fee is $50/year. ■ Permitted Solid Waste Hauler for Hire: Any person that collects, transports, or disposes of solid waste of another person and who has a solid waste hauler permit issued under Article VIII of the ordinance. Permit fee is $1001year. Reporting Requirements: Each permitted solid waste hauler for hire shall submit a monthly certified statement on a form (provided by the City) to the Director showing the total Municipal Solid Waste System Service Charges (MSWSSC)* collected from solid waste customers who are located within the city, and the total MSWSSC fees that were billed to solid waste customers, but uncollected by the permitted solid waste hauler. (See Exhibit 6) *Municipal Solid Waste System Service Charge (MSWSSC): The purpose of the Municipal Solid Waste System Service Charge(MSWSSC) is to fairly assess solid waste system costs to the generators of waste in our city. Each statement must be accompanied by an affidavit signed by an officer of the permitted solid waste hauler for hire before a notary public that certifies that the information is true and accurate. On the 15t' day of each month, the solid waste hauler for hire must submit the form outlined above for the previous month. The solid waste hauler must fill out the form with yardage and/or tonnage collected by category, total the MSWSSC owed for the previous month, and submit with a check to the City. Penalty for late MSWSSC Payment: If payment in full is not made on or before the due date (15th day of each month), the hauler shall pay an administrative late fee of $155 and any amount remaining unpaid shall bear interest at the rate of one and one half (1 1/2) percent per month or the highest rate that may be lawfully charged, whichever is less, from the due date to the actual date of payment. Distribution of Permits & Stickers: Permits and stickers will be issued following receipt of a completed application, payment of required fees, and review of insurance by Risk Management and final approval by the Director of Solid Waste Operations or his designated representative. In addition to the permit fee, there is a yearly sticker fee of $1 per vehicle, trailer, or container. The yellow permit number sticker fee for new haulers or lost stickers will be JE:.n The stickers will be placed on the driver's side fender of the vehicle, trailer, or container in an unobstructed location that is cleanly visible. Please ensure: f Application is fully completed and notarized includes copies of required insurances you have a copy of your current driver's license a copy of sales tax permit payment of the required fees in the form of a check or money order to avoid delays in processing the application. Liability Insurance Requirements: Please note that the City MUST be named as an additional insured with a waiver of subrogation on all certificates. ADDENDUM#3 ATTACHMENT#8 PAGE 18 OF 35 City of Corpus Christi FOR OFFICE USE Solid Waste Operations Permit#: 2416 - 2417 Commercial Hauling Permit Application Approval Date: Date of application: 1.) Applicant Name: , (Last) (First) 2.) Applicant Business Name: 3.) Business Physical Address: (Street Name &#) (City) (State) (Zip) 4.) Business Mailing Address: (P.O. Box or Street Name &#) (City) (State) (Zip) 5.) Business Phone Number: _{ ] 6.) Business Fax Number: _{ ] 7.) E-mail Address (if any): 8.) Number of vehicles the applicant desires to operate: 9.) Location where vehicles will be stored when not in use: 10.) List vehicles 1 containers I dumpsters to be operated on Attachment I (MUST include year 1 make 1 model,vehicle identification number, and license plate number). 11.) Provide description of the nature and character of service rendered to customers: 12.) Provide a description of the areas of the City in which the applicant proposes to provide service: ADDENDUM#3 ATTACHMENT#8 Hauling Permit i 4�C age 1 ❑f 2 13.) Will service be provided to customers or premises located outside the City of Corpus Christi city limits? (Please circle) Yes No 14.) If applicant is a Self Hauler, please identify the types of waste generated and the type of activity from which the waste is generated: 15.) A copy of the applicant's sales tax permit issued by the Texas Comptroller of Public Accounts must be attached to this application (when applicable). I, (Owner/Designee) DO HEREBY ATTEST THAT ANY SOLID WASTE COLLECTED OR TRANSPORTED WITHIN THE CITY WILL BE DISPOSED OF AT A FACILITY THAT IS AUTHORIZED BY THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY TO ACCEPT THE TYPE OF SOLID WASTE THAT (Business Name) HAS COLLECTED OR TRANSPORTED AND THAT ALL FEDERAL, STATE OF TEXAS, AND LOCAL LAWS WILL BE COMPLIED WITH WHEN PERFORMING PURSUANT TO THE CITY PERMIT. (Owner/Designee Signature) (Date) I certify that I have applied to the Department of Solid Waste Operations of the City of Corpus Christi, Texas for a solid waste hauling permit, and that the information provided by me in this application is true and correct. (Owner/Designee Signature) (Date) THIS SECTION FOR NOTARIZATION PURPOSES: State of Texas County of Before me,a notary public, on this day personally appeared known to me(or proved to me on the oath of or through (description of identity card or other document))to be the person whose name is subscribed to the foregoing document and, being by me first duly sworn, declared that the statements therein contained are true and correct. Notary Public's Signature Hauling Permit Application Form,Page 2 of 2 ADDENDUM#3 ATTACHMENT#S PAGE 20 OF 35 Application for Solid Waste Vehicle Registration Sticker* Applicant Name: *Registration fee: $11 vehicle. Registration is for each vehicle used to transport solid waste within the City or to a City owned solid waste facility. Year:. Make&Model: Vehicle Identification #(VIN): License Plate#: Ii i i i i i i i i i i i i i Li i i i . 1 Tare Weight: Gross Weight: Total Cubic Capacity of Body: Year: Make&Model: Vehicle Identification #(VIN): I License Plate#: Z 771 11111111111 11111111111 Tare Weight: Gross Weight: Total Cubic Capacity of Body: Year: Make&Model: Vehicle Identification #(VIN): License Plate#: L 3 Tare Weight: Gross Weight: Total Cubic Capacity of Body: Year: Make&Model: Vehicle Identification #(VIN): License Plate#: 4 Tare Weight: Gross Weight: Total Cubic Capacity of Body: Year: Make&Model: Vehicle Identification #(VIN): License Plate#: 5 Tare Weight: Gross Weight: Total Cubic Capacity of Body: Hauling Permit Attachment I,Page 1 of 4 ADDENDUM#3 ATTACHMENT#S PAGE 21 OF 35 Application for Solid Waste Vehicle Container Registration Sticker'" Applicant Name: *Registration fee: $11 container(only if the container is a roll-off that transports debris to the landfill). Name of Container Manufacturer: Container Model: Total Number of Set Containers in 1 Total Cubic Capacity of Container: Tare Weight: Set 1: Name of Container Manufacturer: Container Model: Total Number of Set Containers in 2 Total Cubic Capacity of Container: Tare Weight: Set 2: Name of Container Manufacturer: Container Model: Total Number of Set Containers in 3 Total Cubic Capacity of Container: Tare Weight: Set 3: Name of Container Manufacturer: Container Model: Total Number of Set Containers in 4 Total Cubic Capacity of Container: Tare Weight: Set 4: Name of Container Manufacturer: Container Model: Total Number of Set Containers in 5 Total Cubic Capacity of Container: Tare Weight: Set 5: Hauling Permit Attachment I,Page 2 of 4 ADDENDUM#3 ATTACHMENT#S PAGE 22 OF 35 Application for Solid Waste Dumpster Registration Sticker* Applicant Name: Location where dumpsters will be stored when not in use: Nature and character of the service the applicant proposes to render within the City: Statement of whether or not the service will be provided to any premises not located in the City: *Registration fee: $1 f dumpster(no sticker required if the dumpster is not transported to the landfill). Name of Dumpster Manufacturer: Dumpster Model: Total Number of 5�t Dumpsters in Total Cubic Capacity of Set 1: 1 Gross Weight of Dumpster: Dumpster: Tare Weight of Dumpster: Name of Dumpster Manufacturer: Dumpster Model: Total Number of 5�t Dumpsters in Total Cubic Capacity of Set 2: 2 Gross Weight of Dumpster: Dumpster: Tare Weight of Dumpster: Name of Dumpster Manufacturer: Dumpster Model: Total Number of Set Dumpsters in Total Cubic Capacity of Set 3: 3 Gross Weight of Dumpster: Dumpster: Tare Weight of Dumpster: Hauling Permit Attachment I,Page 3 of 4 ADDENDUM#3 ATTACHMENT#S PAGE 23 OF 35 Application for Solid Waste Can Account* The definition for"can account" per Chapter 21, Article I, section 21-1, of the Code of ordinances is as follows: "Can account:A commercial or residential account who sets out its solid waste in conventional refuse receptacles of 100 gallons or less capacity for collection by a permitted solid waste hauler." Applicant Name: 'Each solid waste hauler's permit holder shall register each service stop where it collects solid waste from a can account located within the City. Frequency of Service Number of Address of Can Account: Provided to Can Receptacles: Account: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hauling Permit Attachment I,Page 4 of 4 ADDENDUM#3 ATTACHMENT#S PAGE 24 OF 35 EXHIBIT INSURANCE REQUIREMENTS I. HAULERS FOR HIRE-LIABILITY INSURANCE A. Haulers for Hire must not commence work under this contract until all insurance required has been obtained and such insurance has been approved by the City. Haulers for Hire must not allow any subcontractor to commence work until all similar insurance required of any subcontractor has been obtained. B. Haulers for Hire must furnish to the City's Risk Manager and Director of Solid Waste, one (1) copy of Certificates of Insurance with applicable policy endorsements showing the following minimum coverage by an insurance company(s) acceptable to the City's Risk Manager. The City must be listed as an additional insured on the General liability and Auto Liability policies, and a waiver of subrogation is required on all applicable policies.Endorsements must be provided with Certificate of Insurance. Project name and/or number must be listed in Description Bog of Certificate of Insurance. TYPE OF INSURANCE MINL%I[TM INSURANCE COVERAGE 30-day advance written notice of Bodily Injury and Property Damage cancellation, non-renewal, material change Per occurrence - aggregate or termination required on all certificates and policies. Commercial General Liability including: S 100.000 Per Occurrence 1. Commercial Broad Form 2. Premises—Operations 3. Products/Completed Operations 4. Contractual Liability 5. Independent Haulers for Hires 6. Personal Injury-Advertising Injury AUTO LIABILITY(including) $250,000 Combined Single Limit 1. Owned 2. Hired and Non-Owned 3. Rented/Leased C. In the event of accidents of any kind related to this contract, Haulers for Hire must furnish the Risk Manager with copies of all reports of any accidents within 10 days of the accident. II. ADDITIONAL REQUIREMENTS A. Haulers for Hire shall obtain and maintain in full force and effect for the duration of this Contract, and any extension hereof, at Haulers for Hire's sole expense, insurance coverage written on an occurrence basis by companies authorized and admitted to do business in the State of Texas and with an A.M. Best's rating of no less than A-VII. B. Haulers for Hire shall be required to submit a copy of the replacement Certificate of Insurance to City at the address provided below within 10 days of any change made by the Haulers for Hire or as requested by the City. Haulers for Hire shall pay any costs incurred resulting from said changes.)A&qfly %der this ATTACHMENT#8 PAGE 25 OF 35 Exhibit shall be given to City at the following address: City of Corpus Christi Attn: Risk Manager P.O. Box 9277 Corpus Christi, TX 78169-9277 C. Haulers for Hire agrees that, with respect to the above required insurance, all insurance policies are to contain or be endorsed to contain the following required provisions: • List the City and its officers, officials, employees, and volunteers, as additional insureds by endorsement with regard to operations, completed operations, and activities of or on behalf of the named insured performed under contract with the City,with the exception of the workers' compensation policy; • Provide for an endorsement that the "other insurance" clause shall not apply to the City of Corpus Christi where the City is an additional insured shown on the policy; • Provide thirty (30) calendar days advance written notice directly to City of any, cancellation, non- renewal, material change or termination in coverage and not less than ten (10) calendar days advance written notice for nonpayment of premium. D. Within five (5) calendar days of a cancellation, non-renewal, material change or termination of coverage, Haulers for Hire shall provide a replacement Certificate of Insurance and applicable endorsements to City. City shall have the option to suspend Haulers for Hire's performance should there be a lapse in coverage at any time during this contract. Failure to provide and to maintain the required insurance shall constitute a material breach of this contract. E. In addition to any other remedies the City may have upon Haulers for Hire's failure to provide and maintain any insurance or policy endorsements to the extent and within the time herein required, the City shall have the right to order Haulers for Hire to stop work hereunder, and/or withhold any payment(s) which become due to Haulers for Hire hereunder until Haulers for Hire demonstrates compliance with the requirements hereof. F. Nothing herein contained shall be construed as limiting in any way the extent to which Haulers for Hire may be held responsible for payments of damages to persons or property resulting from Haulers for Hire's or its subcontractor's performance of the work covered under this contract. G. It is agreed that Haulers for Hire's insurance shall be deemed primary and non-contributory with respect to any insurance or self insurance carried by the City of Corpus Christi for liability arising out of operations under this contract. H. It is understood and agreed that the insurance required is in addition to and separate from any other obligation contained in this contract. 2016 Insurance Requirements Solid Waste Department. Haulers for Hire ADDENDUM#3 ATTACHMENT#8 PAGE 26 OF 35 EXHIBIT INSURANCE REQUIREMENTS I. SELF-HAULERS -LIABILITY INSURANCE A. Self-Haulers must not commence work under this contract until all insurance required has been obtained and such insurance has been approved by the City. Self-Haulers must not allow any subcontractor to commence work until all similar insurance required of any subcontractor has been obtained. B. Self-Haulers must furnish to the City's Risk Manager and Director of Solid Waste, one (1) copy of Certificates of Insurance with applicable policy endorsements showing the following minimum coverage by an insurance company(s) acceptable to the City's Risk Manager. The City must be listed as an additional insured on the General liability and Auto Liability policies, and a waiver of subrogation is required on all applicable policies. Endorsements must be provided with Certificate of Insurance. Project name and/or number must be listed in Description Box of Certificate of Insurance. TYPE OF INSURANCE MINIMUM INSURANCE COVERAGE 30-day advance written notice of Bodily Injury and Property Damage cancellation, non-renewal, material change Per occurrence - aggregate or termination required on all certificates and policies. Commercial General Liability including: $100,000 Per Occtnrence 1. Commercial Broad Form 2. Premises—Operations 3. Products/Completed Operations 4. Contractual Liability 5. Independent Self-Haulerss 6. Personal Injury-Advertising Injury AUTO LIABILITY(including) $250,000 Combined Single Limit 1. Owned 2. Hired and Non-Owned 3. Rented/Leased C. In the event of accidents of any kind related to this contract, Self-Haulers must furnish the Risk Manager with copies of all reports of any accidents within 10 days of the accident. II. ADDITIONAL REQUIREMENTS A. Self-Haulers shall obtain and maintain in full force and effect for the duration of this Contract, and any extension hereof, at Self-Haulers's sole expense, insurance coverage written on an occurrence basis by companies authorized and admitted to do business in the State of Texas and with an A.M. Best's rating of no less than A-VII. B. Self-Haulers shall be required to submit a copy of the replacement Certificate of Insurance to City at the address provided below within 10 days of any change made by the Self-Haulers or as requested by the City. Self-Haulers shall pay any costs incurred resulting from said changes. AlJ rhe ler this ATTACHMENT#8 PAGE 27 OF 35 Exhibit shall be given to City at the following address: City of Corpus Christi Attn: Risk Manager P.O. Box 9277 Corpus Christi, TX 78169-9277 C. Self-Haulers agrees that,with respect to the above required insurance, all insurance policies are to contain or be endorsed to contain the following required provisions: • List the City and its officers, officials, employees, and volunteers, as additional insureds by endorsement with regard to operations, completed operations, and activities of or on behalf of the named insured performed under contract with the City,with the exception of the workers' compensation policy, • Provide for an endorsement that the "other insurance" clause shall not apply to the City of Corpus Christi where the City is an additional insured shown on the policy; • Provide thirty (30) calendar days advance written notice directly to City of any, cancellation, non- renewal, material change or termination in coverage and not less than ten (10) calendar days advance written notice for nonpayment of premium. D. Within five (5) calendar days of a cancellation, non-renewal, material change or termination of coverage, Self-Haulers shall provide a replacement Certificate of Insurance and applicable endorsements to City. City shall have the option to suspend Self-Haulers's performance should there be a lapse in coverage at any tune during this contract. Failure to provide and to maintain the required insurance shall constitute a material breach of this contract. E. In addition to any other remedies the City may have upon Self-Haulers's failure to provide and maintain any insurance or policy endorsements to the extent and within the time herein required, the City shall have the right to order Self-Haulers to stop work hereunder, and/or withhold any payment(s) which become due to Self-Haulers hereunder until Self-Haulers demonstrates compliance with the requirements hereof. F. Nothing herein contained shall be construed as limiting in any way the extent to which Self-Haulers may be held responsible for payments of damages to persons or property resulting from Self-Haulers's or its subcontractor's performance of the work covered under this contract. G. It is agreed that Self-Haulers's insurance shall be deemed primary and non-contributory with respect to any insurance or self insurance carried by the City of Corpus Christi for liability arising out of operations under this contract. H. It is understood and agreed that the insurance required is in addition to and separate from any other obligation contained in this contract. 2015 Insurance Requirements Solid Waste Department. Self-Haulers 7/28/2015 ds Risk Management ADDENDUM#3 ATTACHMENT#8 PAGE 28 OF 35 EXHIBIT B Fees for Payment of MSWSSC for Permitted Haulers WSSC is only paid on solid waste collected inside the city limits (ICL) WASTE COLLECTED IN THE CITY TYP ❑F BASE TIP FEE STATE FEE MSWSSC T AL CUSTo R Cash by Weigh $35.61/Ton $1.251Ton $10.24/Ton /$47.1 O/Ton Cash by Loose CY $9.941CY $.051CY $0.311CY $10.301CY Not Weighed Cash- Compacted $12.9 CY $.251CY $0 11CY $13.521CY Load Not Wei hed/CY Cash- Construction & $12.961CY $.251CY Demolition $0.31CY $13.521CY Debris/CY Cash-Heavy Brush R Yard $12.9161CY 251 $0.311CY $13.521CY WastelCY *Cash w1Put or $15.141Ton $43.10 Pay Contract $26.71FTon .251T or ($15.14/Ton or $0.911CY $0.911CY) **Account w/PutOor $15,141Ton $43.10 or Pay Contract $26.71/Ton $1.251Ton or ($15.14/Ton or $0.911CY $0.91 CY) **Account w/o \24ITCon $47.10 Put or Pay $35.6 on $1.251Ton ($10.241Ton or Contract Y $0.311CY) Hauler $34,57 $34.571Ton Disposing at -0- -0- or or Non-City Site $1.401CY $1.401CY *Any mixed loads will be assessed the MSWSSC. **All MSWSSC fees ust be remitted by the 151h day of the month following collection by th ermitted hauler. MSWSSC Collection Fees,Page f2 ADDENDUM#3 ATTACHMENT#8 PAGE 29 of 35 WASTE COLLECTED OUTSIDE THE CITY N BASE TIP FEE STATE FEE MSWSSC TOTAL ht $35.611Ton $1.251Ton NONE $36.861Tr ne $9.94CY $.051CY NONE $ 91CY Cash Compacted $12.961CY $.251CY NONE $13.211CY Load Not Weighed/CY Cash Construction & \$161CY $.251CY N $13.211CY Demolition DebrisICY Cash Heavy Brush & $12.961CY $.251CY NONE $13.211CY Yard Waste/CY L 10/ Cash w1Put or $26.711Ton \$,. T/ 251NONE $27.961Ton Pay Contract Account w1Put $26.711Ton $1. ToNONE $27.961Ton or Pay Contract Account w/o Put $35.611Ton $1.251Ton NONE $36.861Ton or Pay Contract Hauler Disposing NIA NIA NIA NIA At Non-City Site MSWSSC Colk6t6pNbesage a 2 of 2 ATTACHMENT#8 PAGE 30 OF 35 MSWSSC Remittance Form Report ■ Period: From To Permit Hal r Name: Solid to collected from inside the City limits (ICL) and disposed at a City -owned Ian mount Charge per Ton / Cubic Yard Total $ Collecte or can account pickups PERMIT #: Tons X = *Cubic Yards X = $ Can Accounts = $ Roll -off Containers = $ Corpus Christi Municipal Code, Sec. 21-4 (3) 0.5% credit = $< * Size of containers multiplied by the frequency o Tota $ service totaled for all accounts serviced. Solid Waste collected from inside the City limits (I • ) d disposed at other than City -owned landfill: Tons Amount Charge per To / Cu • Yard Total $ Collected or can ac unt pick s *Cubic Yards Can Accounts Roll -off Containers Corpus Christi Municipal Code, - -c. 21-47(c)(3) 8.5% credit * Size of containers multiplie y the frequency of service totaled for all . counts serviced. Total: 1. Fees collected current month 2. less: 0.5% • count (line 1 x .005) $ 3. Amount r itted (enclose payment) $ 4. Prior f- . balance due from customers (prior month line 8) $ 5. Add. ee billed in current month $ 6. L=.s: Fees collected in current month (line 1 above) $ 7. ess: Over 60 days past due (attach separate list with copies of invoices) $ Ending balance / next month beginning balance $ MSWSSC R mAage 1 ❑ ATTACHMENT #8 PAGE 31 OF 35 MSWSSC. charges for solid waste disposed At a City -owned landfill: 1. Account • stomers with Put or Pay contract: $15. / ton $0.91 / cubic yard 2. Account cusers w/out Put or Pay contract: $10.241 t. $0.31 / cubic yard 3. Can Accounts: $4.17 per 1110 4. Roll -off Containers: (with Put or Pay) $2.40 / • bic yard capacity per collection (w/out Put or Pay) $0.821 c. is yard capacity per collection MSWSSC. charges for solid waste disposed at other than City -owned landfill: 1. All Permitted Haulers: $34.57 / ton 2. Can Accounts: $4.17 per mouth 3. Roll -off Containers: $3.69 / cubic yard capacity per colle $1.40 / cubic yar THE INFORMATION REPRESENTED ON THI YARDS COLLECTED IN THE CITY OF CORFU (Signature) (Aut ized Officer) DO HEREBY CERTIFY THAT LY REFLECTS THE TONNAGE OR CUBIC E PAST MONTH. TATEMENT ACCU HRISTI DURING THIS SECTION FOR NOTARIZATION PURPOSES: STATE OF COUNTY OF BEFORE ME, the undersigned authority, on th. known to me to be the person whose name i he/she executed the same for the purpose ate) day personally appeare• ubscribed to the foregoing i trument and acknowledged to me that d consideration therein express GIVEN UNDER MY HAND AND SEAL i F OFFICE, this the day of (Notary Signature) This form may be d • icated or additional copies obtained by contacting: Leticia Varela at • 1) 826-1965 or Norma Salinas at (361) 826-1977. Submit C • pleted Form & Payment before the 15th of the month to: ity of Corpus Christi Solid Waste Operations 2525 Hygeia Street Corpus Christi, TX 78415 ADDENDUM #3 ATTACHMENT #8 MSWSSC Remit O n9FoR 2 of 2 Required Records for Haulers for Hire (a) Each permitted solid waste hauler for hire shall maintain the following information in a format that can be readily examined by the Director or an independent auditor that is acceptable to both the Director and the permitted solid waste hauler for hire: (1) A list of all customers located within the City or an industrial district created by the City including: (A) The customer's name; (B) The physical address of each location that is serviced; (C) The size and service level of any container(s) provided at each service location; (D) Whether the container is a roll-on/roll-off container, e.g., a container that is picked up and transported on a vehicle chassis to a disposal site; (E) The classification of the solid waste collected, e.g., commercial hazardous, household waste, special waste; (F) Whether or not the solid waste is compacted before disposal; and (G) The frequency of collection. (2) A list of all customers located outside the City whose solid waste is taken to a facility owned by the City for disposal, including: (A) The customer's name; (B) The physical address of each location that is serviced; and (C) The type of solid waste collected from the customer. (3) The routes taken on a daily basis by any vehicle used to collect solid waste within the City or any vehicle that disposes of solid waste at a City owned facility that is collected from outside the City. (4) Copies of all reports filed with the Texas Comptroller of Public Accounts that relate to any services provided or activities conducted within the City. (b) The permitted solid waste hauler for hire shall make all records required to be maintained under subsection (a) of this section available to the Director or auditor at the permitted solid waste hauler for hire's place of business at any time during normal business hours for inspection. The Director or auditor will provide reasonable advance notice that the hauler's records will be inspected. (c) If the Director or auditor has reason to believe that the Municipal Solid Waste System Service Charge being remitted to the City by the solid waste hauler does not accurately reflect the tonnage and yardage of waste collected, size of container provided, level of service, or disposal site for a specific customer, the hauler shall provide copies of any specific records relating to that customer or transactions involving that customer that are requested by the Director or auditor. (d) Any records relating to individual customers provided to the Director or auditor under this section, except specific records considered by the Director in resolving inconsistencies between a solid waste hauler's statements submitted under section 21-47 and the records maintained under this section, will be treated by the City as privileged commercial information under Section 552.110 of the Texas Public Information Act, Chapter 552, Texas Government Code, if each page of information that is provided to the Director is clearly marked and identified as proprietary information that should not be made available to the public. If a request is received for the information, the request and information will be forwarded to the Texas Attorney General for a determination under Section 552.301 of the Act. The City will withhold the information from the requester under Section 552.305 of the Act until after the Attorney General's decision is received. The City will only release the information if directed to do so by the Attorney General. ADDENDUM #3 ATTACHMENT #8 PAGE 33 OF 35 FREQUENTLY ASKED QUESTIONS: 1. I haul trash from my business maybe once a month to keep the area clean. Do I need a permit to do this? Answer: Yes. 2. I haul yard waste and tree trimmings. I am usually charged by the cubic yard because I only use a pickup truck. Can I be charged by the ton, or am I restricted to cubic yards? Answer: We prefer to charge your Toad by the ton. 3. It seems to me that I am being penalized by being charged for cubic yards instead of tons. Answer: Tonnage is the most accurate form of measurement; using cubic yards is only an estimate. We will weigh all loads when applicable. 4. I am a permitted hauler and have to remit the $10.24 charge per ton to the City each month. When the City bills me, they give me a total due, no tonnage figure. I don't keep track of tonnage at my business. So on what do I base my payment? Answer: Tonnage is the most accurate form of measurement. For haulers who remit MSWSSC fees monthly or use a non -City owned landfill, you will now be required to track tonnages, cubic yards, or both, and remit the appropriate amount of MSWSSC to the City by the 15th of the month following the billing period. As a reminder, the City reserves the right, in accordance with City Ordinance, Chapter 21, to perform annual audits of haulers to ensure compliance of this requirement. 5. How can I find out more information about entering into a Put or Pay Agreement with the City? Answer: Contact Solid Waste Operations at (361) 826-1965. Information Contacts: Leticia Varela -- (361) 826-1965 Norma Salinas — (361) 826-1977 Fax -- (361) 826-1971 For Questions, Comments, or Complaints: Customer Call Center — (361) 826 -CITY (2489) Physical Address: City of Corpus Christi Solid Waste Operations 2525 Hygeia Street Corpus Christi, Texas 78415 ADDENDUM #3 ATTACHMENT #8 PAGE 34 OF 35 "Cover Your Load" tips: • Use a TARP big enough to completely cover your trailer or truck bed — a minimum of four inches should overlap the sides, front and back of your load. • Tightly secure the tarp with ropes, bungee cords, netting or straps. • Put lighter items at the bottom of the load. • When transporting large items, make sure they are tied down and secured to the trailer or truck so they don't move. • A tarp is not required if the debris is completely enclosed by a Toad -carrying compartment. • Make sure your trailer or truck bed does not have holes, cracks or other openings where debris can escape. • Don't overload — keep material level with the trailer or truck bed. • Before leaving the landfill, remove any loose material that may remain in the trailer or truck bed. In Texas, failing to cover your Toad to prevent materials from escaping by blowing or spilling out of your trailers or trucks is against the law and carries a fine of up to $500 for the first offense. Trailers or trucks not appropriately secured are subject to additional fees/charges at the City of Corpus Christi landfill or collection center. Don't Correct ADDENDUM #3 ATTACHMENT #8 PAGE 35 OF 35 E16246 Intermediate Sludge Removal Phase 1 Q and A 11/23/2016 REVISION 4 Item Question/Comment Resolution4 Resolution Date Resolution Distributed 1 What hours will the contractor be allowed to work, 24/7? Weekends? Hours TBD (approx. 7-6 Mon. - Sun. for dredging and dewatering). Subject to noise ordinance 11/3/2016 Y 2 Is there a daily limit that can be delivered to landfill (ton or CY)? No limit. 11/3/2016 Y 3 Any days the landfill will not be open to accept residuals? Holidays, Weekends? Landfill will accept residuals 7 a.m. - 5 p.m. Mon. - Sat. but Sat. Hauling schedule is still TBD. 11/2/2016 Y 4 What's the coagulant and polymer currently used at ONS WFP? Alum coagulant and cationic polymer 11/2/2016 Y 5 Can the pond (Lagoon No. 7) be taken out of service? No, the pond must remain in service and the decant pump station protected from excessive solids. 11/2/2016 Y 6 Can the material be beneficially reused via land application? It's riot a desirable material but some area WTP's do land apply. Not allowed in this contract. 11/2/2016 Y 7 If land application is allowed, can the material be transported in liquid form (in lieu of dewatering)? Land application is not allowable in this contract due to lack of permitted recipients in the area. 11/2/2016 Y S When is the project considered complete? Amount of DT moved or residuals blanket elevation? Quantity of DT removed, as mutually agreed upon during contract award (dependent on unit price). 11/2/2016 Y 9 Does the dewatering polymer need to be NSF approved? Yes, all filtrate will be returned to treatment process. 11/2/2016 Y 10 Is the power at the site provided (paid for) by the customer? Preliminarily, elect. cost is subsidiary to DT bid item. Bid pkg. to ID power source and cost responsibility. 11/2/2016 Y 11 Can the dewatering filtrate be discharged back to the pond? Yes, using NSF approved polymer. 11/2/2016 Y 12 Are the stated milestones achievable? Yes 11/3/2016 Y 13 Is there a preferred route to Cefe Valenzuela? Hearn Rd. 11/3/2016 Y 14 What are the existing conditions in the pond? residuals depth, pond limits, flows? Exhibit provided at workshop and will be updated in bid package along with min and max WSE. 11/2/2016 Y 15 Is there a set residuals sampling date for contractors? Yes, see Item 30 below 11/11/106 Y ADDENDUM #3 ATTACHMENT #9 PAGE 1 OF 10 11/23/2016 Item Question/Comment Resolution Resolution Date Resolution Distributed 16 Is there a preferred residuals laydown area at Cefe? TBD 17 Who is responsible for removing cattails? Contractor. This will likely be a separate bid item. 11/3/2016 Y 18 Will there be opportunity for questions after the bid package is published? Yes, a deadline will be included in the advertisement. 11/3/2016 Y 19 Who will conduct paint filter tests @ each location (plant and landfill)? City staff will at the landfill and contractor will at the plant. 11/3/2016 Y 20 Will the official scale reading be at the landfill or plant? Landfill's scale will be used. 11/3/2016 Y 21 Will there be pre -approved testing labs listed? Yes, bid package will include pre -approved labs. 11/3/2016 Y 22 Will renewal option be mutual or sole discretion of the City? Can contractor decline the renewal offer? Contractors will have option to decline. 11/3/2016 Y 23 Does the lagoon have a liner that needs to be protected. Yes, clay liner. 11/3/2016 Y 24 What is min. and max. WSE in lagoon #7? TBD 25 Are there additional background checks required? No, only as required in contract documents. 11/18/2016 Y 26 Are prevailing wage rates applicable? Yes, TX31 and TX75 11/3/2016 Y 27 Will there be provisions to allow for contract time extensions (incl. milestones) for bad weather, etc. Yes, details will be included in bid package 11/3/2016 Y 28 Does schedule consider variation in percent solids with depth, particularly first milestone? Not directly, first milestone has additional 30 days for mobilization and optimization of operations. 11/3/2016 Y ADDENDUM #3 ATTACHMENT #9 PAGE 2 OF 10 11/23/2016 Item Question/Comment Resolution Resolution Date Resolution Distributed 29 Will the city allow for the residuals to be beneficially reused via land application? No, due to the compressed schedule of this project being a priority and risk of missing scheduled milestones due to prolonged land permitting efforts. Please see meeting minute Q and A document on CivCast for further explanation. 11/11/2016 Y 30 Since it is already November 11th and the plans are not out yet, and no sample date has been scheduled, I would like to request an extension of the bid date since that allows only 10 business days between now and November 30 to take samples, analyze samples and produce a bid. I would like to request a bid extension to Wednesday, December 7. Bid date will remain as 11/30/2016. The plans will be posted to CivCast no later than Monday, 11-14-16. Scheduled sample times are included in the in Addendum bid package and are as follows: Tuesday (11-15-16] & Wednesday (11-16-16); at 8:00 a.m. and 5:00 p.m. & Thursday (11-17-16) at 8:00 a.m. and 12:00 p.m. Contact the Engineer, Ian Clements, iclements@Invinc.com or at 361-548-9915 to coordinate your visit. 11/11/2016 Y 31 The pre project workshop was listed as mandatory, but the plans and specifications issued 11/14/16 state the the pre project workshop was non mandatory. Since the pre-bid workshop was advertised as mandatory, it should remain mandatory. Could you please clarify? Although the pre-bid workshop was advertised on CivCast as "mandatory", it has since been determined that the meeting did not meet the requirements necessary to qualify as a "mandatory" meeting. Specifically, the meeting was not published at least once a week for two consecutive weeks in a newspaper of general circulation with the first day of publication occurring at least 14 days before the date of the workshop. 11/17/2016 Y 32 It is noted that all questions are to be asked through CivCast. However, what is the deadline for questions prior to the closing BID date? The deadline to submit questions on Civcast will be Wednesday, November 23, 2016 at 5:00 p.m. 11/15/2016 Y ADDENDUM #3 ATTACHMENT #9 PAGE 3 OF 10 11/23/2016 Item Question/Comment Resolution4 Resolution Date Resolution Distributed 33 With the deadline to submit questions being right before the Thanksgiving holiday, that doesn't allow much time for Bidders to evaluate the City's responses and how that might effect their bids. Given that timeframe, would the City consider an extension to the bid due date of at least a week? The Bid Date will remain as November 30, 2016. 11/17/2016 Y 34 There are a couple references in the bid specifications to on-line bid submissions as well as hard copy bid submissions. Will the City accept an electronic bid for this project through the CivCast website? If so, when will the on-line Bid button be enabled so that Bidders can upload their bids? Electronic submissions are acceptable. The Bidding feature will be activated the Monday prior to the Bid Opening. On this case the bid opening is November 30th so Online Bidding will be available November 28th) 11/17/2016 Y 35 Will the contractor be able to draw water out of the pre settlement basin at no charge? Water may be taken out of the pre -sedimentation basin at no charge, however NO damage may be done to the existing berms. 11/17/2016 Y 36 What is the price of electric per kwh? This will be addressed in an addendum. 11/17/2016 Y 37 Where is the dB(A) level measured in regards to the noise ordinance in the specifications? Per the City's Ordinance, the dB{A} levels set forth in the ordinance apply to the property where the sound is being received. 11/17/2016 Y 38 Would a privacy fence screen be allowed to prevent from disturbing the privacy of the residents across Hearn Rd.? A privacy fence screen is not required as part of this project, and no payment for such will be authorized as part of this contract. If the Contractor chooses to install a privacy fence screen all costs associated with the screen shall be borne by the Contractor including, but not limited to installation, removal, and any permits required. 11/17/2016 Y 39 Are there any restrictions on starting to dredge in the thicker areas of sludge near the cattails? There are no restrictions on where the dredging operations start, as long as the dredging operations do not impede flow into the lagoon. 11/17/2016 Y ADDENDUM #3 ATTACHMENT #9 PAGE4OF 10 11/23/2016 Item Question/Comment Resolution Resolution Date Resolution Distributed 40 Article 7 of the General Conditions indicates at Paragraph 7.02(c) that Work is not to be performed on Saturday & without OAR's consent. Question: To be as efficient as possible and submit a lower bid to the City we would like to work on most Saturdays. When preparing our bid price can the Contractor assume that they will be allowed to consistently haul far at least one-half of a day on Saturday (as long as the landfill is open) with the other half used for routine maintenance? The City has agreed to allow the Contractor to work at the plant site on Saturdays. If the Contractor wants to perform hauling operations he/she is responsible for all coordination with the Landfill and testing labs 11/17{2{116 Y ADDENDUM #3 ATTACHMENT #9 PAGE 5 OF 10 11/23/2016 Item Question/Comment Resolution Resolution Date Resolution Distributed 41 Section U1 11 uU, varagrapn 1.UL, stares, in pan, me contractor will NOT be responsible for tipping fees at the Cefe Valenzuela Landfill. Later in Section 46 76 11, Paragraph 3.06(D) states, No tipping fee will be imposed on any Hauler in association with the work of this contract. Haulier and Vehicle registration fees specified in Attachment B are applicable and required. It appears from Attachment B that the vehicle registration fee is $1.00/year/vehicle and the Hauler registration (permit) fee is $100.00/year/entity. However, clarification is needed as to the Table, incorporated as Exhibit B to Attachment B, entitled Fees for Payment of MSWSSC for Permitted Haulers, for waste collected in the city and its column labeled, ®ase Tip Fee.at appears there are 3 different types of fees in question. 1. Tipping Fees -our interpretation is that there is no charge to the contractor or the hauler for this fee. 2. Registration Fees -It is our interpretation that this fee is $1.00/year/vehicle. 3. Hauler Fee -It is our interpretation that this fee is $ 100/year/entity. The basis of this question relates to the table listed in Exhibit B which has a variety of fees listed that will greatly affect the bid price. If these fees do not apply we are confused as to why they are in the specifications. If they do apply then we need clarification on exactly what fees on this exhibit apply. Question: Have we interpreted the fees correctly that we would owe in items 1-3 listed above or are there any other —1 foo., +1,..t ,.,,...1.4 h., L,,,.,,E,.,a7 The interpretation of the fees is correct. Tipping fee will not be required. The tipping fee table will be crossed out/stricken from the specification. The $100 permitted solid waste hauler and $1.00 annual and $5.00 initial or lost permit per vehicle or container fees will be required. 11/17/2016 y 42 ,.,.i.iiri. Can additional dates be set for samples to be taken (11/21-11/23)? Additional samples may be obtained November 21, 22, or 23. Any sampling must be scheduled and coordinated with the Engineer a minimum of 1 hour prior to arriving at the site. 11/21/2016 y ADDENDUM #3 ATTACHMENT #9 PAGE 60F 10 11/23/2016 Item Question/Comment Resolution4 Resolution Date Resolution Distributed 43 Does the City have a list of certified MBE firms that could be used for this project? The City does not have a list of certified MBE firms. 11/18/2016 Y 44 In the Addendum 41 there was no listing of approved certified labs for testing the solids daily. Can that be provided. Approved Certified Labs for the TCLP & TPH are: Test America Laboratories Inc. and AnalySys Laboratories Approved Certified Labs for moisture content are: Tolunay Wong Engineers Incorporated and Rock Engineering 11/18/2016 Y 45 Are there any road restrictions on Hearn Road that will affect trucks transporting sludge to the landfill? No project specific restrictions other than the restricted hours for hauling operations. 11/22/2016 Y 46 Can you provide the instantaneous flow rate into Lagoon 7? Absolute Maximum instantaneous inflow rate is approximately 53,500 gpm. Typical maximum is approximately 36,500 gpm. Both max flow rates are for short durations (between 5 and 15 minutes). Average inflow throughout the day is estimated to be between 2,000 gpm and 3,000 gpm. 11/22/2016 Y 47 In many areas of the documents, it references the bid closing date being Tuesday, November 30, 2016. Just to confirm, this bid closes on Wednesday, November 30, 2016 is this correct? Correct, bids will be opened Wednesday 11/30/16. 11/22/2016 Y Addendum 43 will include revised sections reflecting corrected day of the week. 48 In Section 00 21 13, Article 16, it references a Minority participation goal (45%) and a Minority Business Enterprise participation goal (15%). Further clarification is provided in Section 00 72 03. We understand the MBE goal, but we do not understand how the Minority participation goal differs from the MBE goal in its definition. Is this a measure of Minority persons (as defined in 00 72 03) participating on the project, but while in the employ of a business that is not MBE? Can some additional clarification be provided? Essentially, the Minority Business Enterprise Participation is the sub -contractors subcontracted by the Prime Contractor and the Minority Participation is the labor force of the Prime Contractor. 11/22/2016 Y ADDENDUM #3 ATTACHMENT #9 PAGE 7 OF 10 11/23/2016 Item # Question/Comment Resolution Resolution Date Resolution Distributed 49 In Section 00 72 00, Article 7, 7.02 it states Work at the Site can be performed during regular working hours and not on Saturday, Sunday or legal holiday. In Section 46 76 11, Article 3, 3.05 F. it states that operations shall be permitted 24 hours per day and 7 days per week. Please confirm that dredging and dewatering operations can run 24/7/365 uninterrupted provided they comply with the applicable City's noise ordinance. Also please confirm that no additional cost will be required to be paid to Owner for running outside regular working hours as per 00 72 00 7.02 E. Revised Section 00 73 00 SUPPLEMENTARY CONDITIONS is provided in Addendum #3 to replace the existing 00 73 00. The revised 00 73 00 replaces 00 72 00 GENERAL CONDITIONS Article 7.02 in it's entirity to clarify working hours. 11/22/2016 Y 50 In Section 00 72 01 Insurance Requirements, 1.01 A. it appears from the table as though the City is indicating that Builder's Risk insurance is required. Given this is a service oriented project, we would ask for clarification as to why Builder's Risk insurance would be required, and respectfully request that this requirement be removed. Revised Section 00 72 01 INSURANCE REQUIREMENTS provided in Addendum #3 that changes Builder Risk Insurance Coverage to "Not Required°'. Y 51 5. In Section 00 52 23 3.02 A., it refers to Liquidated Damages, but with a zero dollar value, in section 01 35 00 it indicates that the Owner may terminate the Agreement in lieu of liquidated damages. Is our interpretation correct that there is no set dollar amount for liquidated damages, and the Owner's recourse should milestone dates not be met would be to terminate the agreement? Should this termination be exercised please confirm that the provisions of 00 72 00 16.03 would apply, or if not, what termination provision would be followed? Interpretation is correct. City's recourse for missed milestones is contract termination. Termination would follow "00 72 00 ARTICLE 16.02 Owner May Terminate for Cause". 11/22/2016 Y ADDENDUM #3 ATTACHMENT #9 PAGE8OF 10 11/23/2016 Item Question/Comment Resolution4 Resolution Date Resolution ❑istributed 52 There appear to be two 01 35 00 Special Procedure section, which differ slightly in content. Please confirm which is the correct one to incorporate. Addendum 43 will be issued with a revised 0135 00 SPECIAL CONDITIONS to replace both duplicate sections. 11/22/2016 Y 53 Section 01 50 00 2.01 A. states that the Contractor must provide a field office for OPT use, but the specified details are removed. Please provide information on the expectations for this office and if it is to be supplied by Contractor. This section wll remain as is. Contractor should provide a field office only of "adequate size for Contractor's use." 11/22/2016 Y 54 Section 46 76 113.01 B. states that the vegetation may be disposed of at the Pollywog Ponds site, and drawing 3 shows that it can be disposed in West Lagoon 1 and East Lagoon 4 at the Pollywog site. Can the vegetation also be disposed of at the Valenzuela Landfill? Lagoons 1 and 4 are within the Pollyowg Pond site. Disposal of aquatic vegetation at Cefe Valenzuela will be allowed and will be subject to hauling operation restrictions. No tipping fees will be assessed for aquatic vegetation. 11/22/2016 Y 55 Regarding disposal of the vegetation at the Pollywog site, who will be responsible for managing the material once it is dumped in Lagoon 1 or 4? Once dumped in the lagoon, to the satisfaction of the owner (i.e. completely within the berm of the lagoon), the Owner would be responsible for the material. 11/22/2016 Y 56 Section 46 76 11, Sub Section 1.02, Item A2 reads, At least three (3) of the five (5) projects meeting the requirements in 1 above must have consisted of aluminum sulfate (Alum) residuals." Is this an absolute requirement to be considered for this project? If bidders have not completed three (3) projects of greater than or equal to 10,000 DT with aluminum sulfate residuals, will they be automatically disqualified? Section 46 76 11 has been revised to loosen requirements for project experience with Alum residuals. Bidder must submit at least one project that demonstrates experience dewatering alum residuals. This project may be included in the 5 required projects or may be in addition to the 5 required projects. 11/22/2016 Y ADDENDUM #3 ATTACHMENT #9 PAGE9OF 10 11/23/2016 Item # Question/Comment Resolution Resolution Date Resolution Distributed 57 Section 01 29 01 1.03 A. 1. h. limits the Mobilization line to be no more that 5% of the total Contract Price. Due to some of the large expenditures required on this project regardless of quantity of Dry Ton removed, we would request the City to relax this limit to be a bit higher, and we would suggest 7.5-109'0. This still prevents front price loading and the benefit to the City is that if a Contractor must blend fixed cost items into the Dry Ton unit rate, there is going to be a slight premium on this (and therefore higher cost to the City) due to contingency to hedge a situation where quantities end up less than 10,000 dry ton. Section 00 30 01 BID FORM and Section 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT will be revised and issued with Addendum #3 increasing maximum allowable mobilization to an amount not to exceed 7.5% of the total bid price. 11/23/2016 Y 58 In the originally released Project Description document, it referenced the existing access road being available for Contractor access, that Contractor would be responsible for maintaining the road in a condition that is suitable for their own use, but not expected that the Contractor would be responsible for restoring the road to existing condition. It is assumed this reference is to the road shown on drawing 4, that runs parallel to Hearn Rd. but inside the plant fence. Is it acceptable for the Contractor to make use of this access road to the staging area (for hauling trucks etc.), and if so, under what requirement for road condition at the end of the project? The access road referenced in the original project advertisement was not the access road parallel to Hearn Rd. but the road that runs from southwest to northeast into the plant (perpendicular to Hearn Rd.). The staging area has since been moved to the paved area on sheet 4 adjacent to Hearn Rd. with the intention of keeping the hauling operation traffic off of plant access roads. Sheet 4 designates the bull rock driveway as the entrance and exit point for hauling operation traffic. The access road parallel to Hearn Rd. may be used for Mobilization and any other traffic but may not be used by hauling operation traffic. There are no requirements for restoration of the staging area or bull rock driveway. 11/23/2016 Y 59 ADDENDUM #3 ATTACHMENT #9 PAGE 10 OF 10 00 91 01 ADDENDUM NUMBER 2 Project o.N. Stevens Water Treatment Plant Intermediate sk,dge Owner: City of Corpus Christi City Engineer: 1.H. Edmonds, P.E. Designer: LNV, Inc. Phase l reject Number: E16246 Addendum No. 2 Specification Section: 00 9101 Issue Date: 11/18/2016 Acknowledge receipt of this Addendum in the Bid Acknowledgement Form submitted for this Project. Failure to acknowledge receipt of this addendum in the Bid Acknowledgement Form may render the Bid as non-responsive and serve as the basis for rejecting the Bid. Make the additions, modifications or deletions to the Contract Documents described in this Addendum. Approved by: LNV, Inc. Marcus J. Naiser, P.E. 11/18/2016 Name Date Addendum items: 1. Apparent three low Bidder's must submit Form 1295 due 24 hours after bid opening. Clarification is provided in Article 4 of this addendum. 2. Revised Bid Form (Attachment #1). 3. Revised Specification Section 46 7611 Dredging, Dewatering, and Hauling (Attachment #1). a. Tipping fee tables have been removed. Tipping fees will not be required. b. Added definition of dry tons (DT). 4. Revised Plan sheets (Attachment #2). a. Sheet 1— New Sheet Index b. Sheet 2 — No Change c. Sheet 3 — Revised Project General Notes 7, 9,10 and added note 11. d. Sheet 4 — Revised power supply location and notes. e. Sheet 5 -- Removed power supply note f. Sheet 6 — Deleted g. Sheet 7 — Deleted 5. Clarifications to CivCast Questions (Attachment 113). sr. is i ' d` i, MARCUS J. NAISER. 0 . 92814 LNV, Inc. TBPE Frim No. F-366 Addendum No. a_ 00 9101-1 D.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 ARTICLE 1— BIDDING REQUIREMENTS 1.01 ACKNOWLEDGE ADDENDA A. Acknowledge receipt of this Addendum in the Bid Acknowledgement Form submitted for this Project. Failure to acknowledge receipt of this addendum in the Bid Acknowledgement Form may render the Bid as non-responsive and serve as the basis for rejecting the Bid. ARTICLE 2 — MODIFICATIONS TO THE SPECIFICATIONS OR TECHNICAL SPECIFICATIONS. 2.01 ADD, DELETE OR REPLACE SPECIFICATION SECTIONS (OR TECHNICAL SPECIFICATIONS) A. REPLACE the following Specification Sections or Technical Specifications (all included as Attachment #1): Division / Section Title Division 00 Procurement and Contracting Requirements 00 30 01 Bid Form (Revel -13-2016) (Attachment #1) GENERAL NOTES AND ESTIMATED QUATITIES (Attachment #2) 4 OVERALL SITE PLAN (Attachment #2) Part T PROPOSED DREDGING PLAN (Attachment #2) Technical Specifications 46 76 11 Dredging, Dewatering and Hauling (Attachment #1) ARTICLE 3 — MODIFICATIONS TO THE DRAWINGS 3.01 ADD, REPLACE OR DELETE DRAWINGS A. ADD the following Drawings: NONE B. REPLACE the following Drawings (all included as Attachment #2): Sheet No. Drawing Title 1 COVER SHEET (Attachment #2) 2 TYPICAL LEGEND AND TESTING SCHEDULE (Attachment #2) 3 GENERAL NOTES AND ESTIMATED QUATITIES (Attachment #2) 4 OVERALL SITE PLAN (Attachment #2) 5 PROPOSED DREDGING PLAN (Attachment #2) C. DELETE the following Drawings: Sheet No. Drawing Title 6 OVERALL ONE -LINE DIAGRAM FOR EXISTING SLUDGE HANDLING MCC 7 EXISTING SLUDGE HANDLING MCC ONE -LINE DIAGRAM Addendum No. 2 00 9101 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 ARTICLE 4 — CLARIFICATIONS 4.01 QUESTIONS A. Please see Attachment #3 "E16246 Intermediate Sludge Removal Phase 1 Q and A" REVISION 3 dated 11/18/2016. All questions and answers submitted since Addendum #1 was issued are shown in bold font. 4.02 CLARIFICATIONS A. Bidders are hereby notified that Texas Ethics Commission Form 1295 must be submitted by the three apparent lowest bidders within 24 hours of bid opening. The form must be filed electronically. Bidders may create a login and password and submit the form at the URL below. Once the form is submitted electronically it must be printed, signed, notarized and submitted to the City or Engineer. https://www.ethics.state.tx.us/whatsnew/elf info form1295.htm B. Bidding will be open to all prospective bidders, regardless of whether or not the Bidder had a representative in attendance at the Pre -Bid Workshop held on Wednesday November 2, 2016. Although the pre -solicitation workshop was advertised on CivCast as "mandatory", it has since been determined that the meeting did not meet the requirements necessary to qualify as a "mandatory" meeting. Specifically, the meeting was not published at least once a week for two consecutive weeks in a newspaper of general circulation with the first day of publication occurring at least 14 days before the date of the workshop. C. A transformer of the capacity and location shown in the drawings will be provided l others for the Contractor's use during this contract. The Contractor will still be responsible for all secondary power improvements (from transformer to Contractor's Equipment, temporary or permanent) required to perform the Scope of Work. All improvements must meet applicable codes. The electrical power consumed through the provided transformer will be paid for by the City. END OF ADDENDUM NO. 2 Addendum No. 2 00 9101 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 Addendum #2 Attachment #1 Replacement Specification Sections and Technical Specifications Project Name: O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 Project Number: E16246 Owner: City of Corpus Christi Bidder: PART A - GENERAL (per SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) OAR: TBD Designer: LNV, Inc. Basis of Bid Item DESCRIPTION UNIT QUANTITY (Bid Evaluation ONLY - NOT FOR AWARD) UNIT PRICE EXTENDED AMOUNT Base Bid PART A - GENERAL (per SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) Al Mobilization/Demobilization, Complete in Place per Lump Sum. LS 1 A2 Dredge, Dewater and Haul residuals from Lagoon #7 including all work and materials considered subsidiary to this bid item (subsidiary items include but are not limited to; furnishing dredge equipment, furnish and install turbidity protection for washwater return pump station, furnish and install dewatering equipment, polymer injection equipment, residual and polymer containment areas as required, filtrate return provisions, trucks, fuel, truck maintenance, maintenance of access, electrical feed for dewatering equipment, permits, licenses and certifications as required, and residual analytical testing) as per specification, Complete in Place per Dry Ton. DT 10,000 A3 Remove cattails and other aquatic vegetation from Lagoon #7, as necessary to perform the required dredging, Complete in Place per Lump Sum. LS 1 SUBTOTAL PART A - GENERAL (Items Al thru A3) TOTAL EXTENDED AMOUNT FOR ITEM A2 IS FOR BID EVALUATION PURPOSES ONLY ADDENDUM #2 ATTACHMENT #1 PAGE 1 OF 37 BID SUMMARY SUBTOTAL PART A - GENERAL (Items Al thru A3) TOTAL PROJECT BASE BID (PART A) Contract Times Bidder agrees to reach Substantial Completion in 365 days Bidder agrees to reach Final Completion in 395 days ADDENDUM #2 ATTACHMENT #1 PAGE 2 OF 37 SECTION 46 76 11 DREDGING, DEWATERING AND HAULING PART IGENERAL 1.01 DESCRIPTION This specification shall govern the furnishing of all labor, material, equipment, and all work to remove residuals material from Lagoon No. 7, dewater the material as necessary, and haul the material to the landfill, as specified on the drawings. All residuals handling, transporting, and disposal shall comply with TCEQ chapters 315 and 305. All temporary or permanent improvements made to the plant site for the purpose of this contract shall be in compliance with all applicable Federal, State, and local regulations. The Contractor shall provide the appropriate documentation of compliance upon request from the City or Engineer. The initial base contract will be for a one (1) year (12 -calendar months) and approximately $4M with one (1) optional one (1) year (12 -calendar months) renewal for an additional $4M based on Contractor's successful performance, approval by the City/Engineer and concurrence from the Contractor. The total estimated quantity of residuals to be removed during the base contract is 10,000 dry tons (DT). A dry ton (DT) for the purpose of this contract is defined as 2.000 U.S. pounds of material at 100% total solids content (0% moisture content). 1.02 SUBMITTALS A. Minimum requirements for projects to be considered equal to or greater are as follows: 1. Five (5) projects in the past five (5) years in which the Contractor dewatered and hauled and/or dredged 30 dry tons (DT) per day or 10,000 DT per year of water treatment plant residuals. 2. At least three (3) of the five (5) projects meeting the requirements in 1 above must have consisted of aluminum sulfate (Alum) residuals. B. Include the following, per Section 00 45 16 STATEMENT OF EXPERIENCE §§5.01., with the Bid. All documents listed below should be submitted in a format in accordance with Article 4 of the STATEMENT OF EXPERIENCE. 11x17 sheets should be used for the Site Exhibit and Proposed Schedule 1. Site Exhibit The Site Exhibit should convey as much information about the strategy to complete the Scope of Work as graphically possible. The Work Plan Narrative and Site Exhibit are complimentary to each other and information shown in one does not need to be repeated in the other but discrepancies between the two should be avoided. 2. Work Plan Narrative The Work Plan Narrative should describe the methods, equipment, materials, personnel and schedule proposed by the Contractor to achieve the Project's Scope of Work. The purpose of the Work Plan Narrative is to add operational and process detail to the Site Exhibit that cannot be conveyed graphically. The Work Plan Narrative should be limited to no more four (4) pages. ADDENDUM #2 ATTACHMENT #1 PAGE 3 QF 37 3. The following information should be included in either the Site Exhibit or the Work Plan Narrative: a. Mobilization and Placement of Dredging, Dewatering, and Hauling Equipment including: 1) Types, capacity, and quantity of dredges 2) Method for removing aquatic vegetation (cattails). 3) Plan for deployment of dredge into pond (crane required)? 4) Mobilization schedule 5) Proposed site footprint 6) Proposed method, equipment, and duration for removing cattails Dredging Operation Plan 1) Provisions for protecting Liner 2) Anticipated dredge rate and working hours 3) Redundancy or provisions for equipment failure 4) General pattern of progression of residual removal inside Lagoon #7 c. Dewatering Operation 1) Types, capacity, and quantity of dewatering equipment 2) Deployment and footprint of dewatering equipment 3) Configuration of dewatering equipment, piping, tanks, etc. 4) Footprint of polymer feed equipment 5) Flow control/buffer between dredge and dewatering equipment including type, capacity, and quantity of attenuation basins/tanks (if required). 6) Configuration of dewatering equipment discharge (i.e. pipes, conveyors, cake receiving containers, cake stockpile area, etc.) b. 7) Containment details for dewatering and stockpile area. 8) Configuration of filtrate return equipment including attenuation tanks, pumps, hose routing, discharge location, etc. (as applicable). d. Hauling Operation 1) Capacity, quantity, and type of truck. 2) Capacity, quantity and staging footprint of roll -off containers or other hauling containers, trailers or trucks. 3) Proposed site ingress and egress. Ingress and egress from Hearn Road is available. Describe improvements to access points or staging area, if needed (subsidiary to unit price per dry ton). 4) Proposed load sampling location ADDENDUM #2 ATTACHMENT #1 PAGE 4 OF 37 5) Proposed route to and from final disposal site (Cefe Valenzuela Landfill or other). 6) Estimate of anticipated total number of loads required and number of loads per day. e. Any unique or significant equipment, processes, or procedures that are not listed above. THE SUBMITTALS DESCRIBED IN THE REMAINDER OF SECTION 1.02 ARE CONSTRUCTION SUBMITTALS AND ARE NOT DUE TO BE SUBMITTED WITH THE BID. CONSTRUCTION SUBMITTALS ARE DUE AFTER CONTRACT AWARD AND BEFORE EXECUTION OR IMPLEMENTATION OF ANY OF THE WORK ASSOCIATED WITH EACH RESPECTIVE SUBMITTAL. C. Dredge Equipment: Contractor shall provide specific information on equipment to be used to perform dredging. Include equipment manufacturer, model number, type of dredge head, positioning system, and performance characteristics. Also include recent photographs of equipment. The dredge equipment submittal shall be delivered to the Engineer for review no later than fourteen (14) calendar days after the issuance of the Notice of Award Letter. Engineer shall notify contractors of equipment approval in accordance with the General Conditions. The City reserves the right to disallow, at any time, the operation or use of any equipment component that it deems inadequate to perform the work within the specified contract time, or that could potentially compromise the public water supply in any way, or that does not meet the noise ordinance criteria stipulated in 3.05 .F. D. Pre Dred e Surve /Statement of Concurrence: Prior to commencing dredging operation, verify E. Dewaterinq Equipment: Contractor shall provide specific information on equipment to be used to perform dewatering. Include equipment manufacturer, model number, and performance characteristics. Also include recent photographs of equipment. F. Polymer: Contractor shall provide specific information on polymer to be used. Include manufacturer, trade name, MSDS, and proof of NSF certification. G. Polymer Feed Station: Contractor shall provide specific information on equipment to be used in the polymer feed station. Include list of major components (tanks, metering pumps, mixers with manufacturer, model number, and performance characteristics. Also include recent photographs of equipment. H. Trucks and Containers: Contractor shall provide specific information on equipment to be used for hauling. Include equipment manufacturer, model number, gross vehicle weight rating (GVWR), and current registrations, inspections, and certifications. Include recent photographs of equipment. Also include the Unique Truck/Container ID key in accordance with section 3.08C.1.I. I. Turbidity Curtain: Contractor shall submit product information for the proposed turbidity curtain meeting the requirements of section 3.07. C. J. Percent Solids Sampling Plan: Contractor shall submit a percent solids sampling plan describing method of obtaining representative samples for each load, making daily composite ADDENDUM #2 ATTACHMENT #1 PAGE 5 OF 37 sample, preserving sample(s) for testing and schedule of delivery of samples and receipt of laboratory testing results. K. Testina Laboratory: Contractor shall submit the name, physical address, and contact information of their proposed testing laboratory, for approval. If separate labs are proposed to be used for the percent solids testing and TCLP/TPH testing Contractor shall submit the required information for both laboratories. L. Pipeline Map: Prior to commencing dredging operation, provide a site map showing all pipelines, including pipeline routing and crossings, and location of dredge/residual discharge point. Contractor to provide piping protection at all road crossings. Include any existing utilities and protection. M. Notification: The Contractor shall notify the City Water Department or Plant Staff in writing, at least ten (10) days prior to setup of any dredge equipment directly in the lagoons, or to request water level adjustments in the lagoons. N. Daily Activity Reports: During the dredging operation, provide a daily record of activities occurring at the lagoon(s), and disposal site. Submit daily reports to the Engineer on a weekly basis. Refer to paragraph 3.09.A. O. Spill Contingency Plan: Prior to commencing dredging operation, provide a Spill Contingency Plan. Refer to paragraph 3.08.B. P. Monthly Operations Report: Upon submittal of the monthly invoice the Contractor shall submit a Monthly Operations Report that shall be in accordance with section 3.09.B: 1.03 QUALITY ASSURANCE A. Permits: The Contractor shall comply with all conditions and requirements of Federal, State, and local regulations and specifically with TCEQ Chapters 312 and 305. There shall be no discharge of dredged material or water from City property or outside of the drainage area of the lagoon. B. Environmental Protection Requirements: Provide and maintain environmental protection measures during the entire construction period. Comply with all Federal, State, and local regulations pertaining to water, air, and noise pollution. C. Public Water Supply Protection Requirements: Protection of the public water supply is essential. Prevent fuels, hydraulic fluid, lubricating oils, and any other contaminants from entering the lagoons. Provision to protect the public water supply should be prominent in the Spill Contingency Plan provided by the Contractor. PART 2PRODUCTS 2.01 DREDGE/RESIDUALS MATERIAL A. Lagoon Material: Any and all material (unclassified) that currently exists within the lagoons. B. Objectionable Material: Material such as rocks, cable, trees, tires, concrete, debris, etc. shall not be deposited or temporarily stored anywhere within the site. This material shall become property of the Contractor and be removed from the project site and disposed of in accordance with all applicable laws and ordinances. C. Aquatic Vegetation: Any aquatic vegetation existing near the surface of the lagoon and specifically cattails. ADDENDUM #2 ATTACHMENT #1 PAGE 6 OF 37 PART 3EXECUTION 3.01 LAGOON PREPARATION A. Verification of Conditions: Prior to setup of dredge equipment within the lagoons, verify that existing conditions are consistent with the drawings. Immediately notify the Engineer should there be any discrepancies. B. Removal of Aquatic Vegetation: Removal of all aquatic vegetation (cattails, etc.) will be required. All aquatic vegetation shall be removed to facilitate dredging and in a way that prevents damage to the embankment of the lagoon(s). The aquatic vegetation removed from the lagoon may be disposed of at the Pollywog Ponds disposal site. Method of vegetation removal is to be determined by the Contractor and submitted to the Engineer for approval. 3.02 DREDGE EQUIPMENT/SETUP A. Dredge Equipment: Equipment utilized to remove residuals material from the lagoons shall have the following minimum features and characteristics: 1. Dredge positioning system (cable drive or self -propulsion) without spuds. 2. Skids or other protection device at dredgehead to prevent damage to clay liner and slopes of lagoons. 3. Electric or hydraulically powered. All hydraulic fluid shall be biodegradable. No combustion engines shall be permitted within the lagoons unless specifically equipped with satisfactory spill containment to ensure that fuel does not leak into the public water supply. B. Emergency Spill Response Equipment: Prior to commencing dredging operation, sufficient spill response equipment, i.e. boom, etc. shall be on-site and ready for deployment in the event of an emergency or accident. C. Water Level Adjustments: At the Contractor's request and at the City's discretion, the water level in the lagoons may be adjusted to support the dredging operation. The City has limited ability to add or remove water at the lagoons therefore arrangements must be made 72 -hours in advance of the starting of removal/dredging operations if adjustments are required. The City and plant operators have full discretion as to whether the water level adjustments can be facilitated or not. D. Setup: The dredge, pipelines, and associated equipment shall be of a size sufficient to perform the work and shall be kept in condition for efficient production. E. Turbidity Curtain: A turbidity curtain shall be installed by the contractor around the lagoon pump intake to prevent turbid water from entering the decant water pumping system. 3.03 DREDGING OPERATION A. General: Dredging shall be performed by mechanical or hydraulic methods or other method authorized by the Engineer. B. Dredge Cut Tolerance: Plus or minus 0.50 feet. C. Protection of Existing Embankment and Lagoon Appurtenances: Use care in prosecuting the work to assure the side slopes of embankments, clay liner, bottom, and other structures within the lagoons are not jeopardized by dredging. Repair any damage resulting from the dredging operation to the satisfaction of the City and at the expense of the Contractor. ADDENDUM #2 ATTACHMENT #1 PAGE 7 QF 37 3.04 DREDGE/RESIDUALS DISCHARGE A. General: Dredge/residuals material shall be pumped or otherwise conveyed to the stagingldewatering area identified by the Contractor. Material shall not be deposited or allowed to flow into any stream tributary, existing drainage outlet ditch, canal, water intake, or outlet facility; nor shall materials be allowed to flow onto any improved areas in or adjacent to the disposal site. The Contractor shall promptly remove any spilled material and shall place it in the disposal site. B. Pipelines: The use of pontooned or submerged sections of the dredge pipeline shall not interfere with the normal operation of the lagoon(s). C. Unauthorized Disposal of Material: Dredged/residuals material may not be deposited anywhere on site other than being temporarily held and contained in a designated stockpile area or tank. During the progress of the work, the Contractor shall not deposit worn out discharge pipe, wire, rope, scrap metal, timbers, or any other such type of rubbish or obstructive material on site. Such material, together with any scrap, rope, wire cable, piles, pipe, or any other obstructive material which may be encountered during the dredging operations, shall be properly disposed of by the Contractor in accordance with state and federal regulations. 3.05 RESIDUALS DEWATERING A. Dewatering of residuals is required, as necessary to pass the paint filter test, before hauling to a permitted municipal solid waste landfill. B. Contractor will be responsible to select the means of dewatering and submit the proposed equipment to the Engineer for approval. C. The use of a NSF approved polymer is allowed as necessary to facilitate dewatering. D. Other than polymer, addition of any other material that would change the chemical or physical properties of the dewatered residuals is prohibited unless otherwise approved by the Engineer. E. Any dewatering operation and equipment shall be sufficiently contained to prevent a spill or discharge of wet or dewatered material into any stream tributary, existing drainage outlet ditch, canal, water intake, or outlet facility; or any improved areas in or adjacent to the site. The Contractor shall promptly remove any spilled material and return it to the removal process for ultimate disposal at the disposal site. F. Dredging and dewatering operations shall be permitted to occur 24 hours per day and 7 days per week with no exceptions given that the equipment and operations comply with the Code of Ordinances. City of Corpus Christi. Texas. Part III. Chapter 31 (Ord. No. 027440, § 1, 10-9-2047). A portion of the applicable ordinance is provided below for reference. "It shall be unlawful for any person to conduct, permit, allow, or produce a sound that is discernable beyond the property lines of the property on which the sound is being produced that, when measured with a sound level meter using the standardized frequency weighting as specified by the American National Standards Institute, exceeds the applicable dB(A) level listed below for the property on which the sound is received: (1) Seventy (70) dB(A) between the hours of 8:01 a.m. and 11:00 p.m. Sunday through Thursday and between the hours of 7:01 a.m. and 12:00 midnight on Friday and Saturday. (2) Sixty (60) dB(A) between the hours of 11:01 p.m. and 8:00 a.m. Sunday through Thursday and between the hours of 12:01 a.m. and 7:00 a.m. on Friday and Saturday and between the hours of 12:01 a.m. and 8:00 a.m. on Sunday. ADDENDUM #2 ATTACHMENT #1 PAGE 8 OF 37 (3) Eighty-five (85) dB(A) for sound that both originates from and is received on property within the Entertainment District, at all times." G. If the dredging or dewater equipment does not comply with the City's noise ordinance as referenced herein, the dredging and dewatering operation will be limited to normal plant business hours (between the hours of 7 a.m. and 6:00 p.m. Monday through Friday). 3.06 HAULING A. Regulatory Compliance: All vehicles and hauling containers must comply with Federal, State, and local regulatory requirements. Specifically, TCEQ chapters 312 and 305 shall be complied with at all times, as applicable. B. All hauling vehicles shall comply with the weight limits established by the Texas Department of Motor Vehicles for each vehicles respective axle combination. C. Trip Tickets complying with TCEQ Chapter 312 shall be submitted to the Engineer for each load hauled from the project site. Trip Tickets shall be submitted on a weekly basis. An example Trip Ticket is provided herein as Attachment A for Contractor's reference and use. Trip Tickets must be retained for a period of five (5) years and be made available to TCEQ upon request. D. All Haulers and their vehicles must be registered with the City of Corpus Christi. All requirements and necessary forms and fees are detailed in Attachment B to this specification. No tipping fee will be imposed on any Hauler in association with the work of this contract. Hauler and Vehicle registration fees specified in Attachment B are applicable and required. E. Hauling operations shall be limited to arriving at Cefe Valenzuela landfill between the hours of 7:00 a.m. and 5:00 p.m. Monday through Friday and between 11:00 a.m. and 5:00 p.m. on Saturday. No hauling will be permitted on Sunday. F. Upon departure from the project site, each truck must be sampled for percent solids and paint filter test by the Contractor in accordance with section 3.08.C. Paint filter test at the project site will be conducted by the Contractor for the Contractors reference and to ensure the load will be accepted at the landfill. G. Upon arrival at the disposal site, each truck will be sampled for paint filter test by landfill staff. This will be the official paint filter test and will determine whether the load is acceptable to the landfill or not. H. The Contractor will use the scales provided at the landfill for Gross Weight and Tare Weight measurements. The loads net weight will be calculated as Gross Weight minus Tare Weight. Upon the landfills acceptance of the load based on the paint filter test, the landfill will provide direction as to the area for the load to be deposited. J. Contractor shall be responsible to prevent spillage and tracking and will be responsible for remediating, cleaning and restoring any areas on which spillage or tracking occurs. K. Contractor shall be responsible for any site improvements required to accommodate the hauling operation such as entrances, driveways, etc. Contractor shall also be responsible to maintain site access surfaces in a condition acceptable to their hauling operation. All access improvements or maintenance are considered subsidiary to the unit cost per dry ton. ADDENDUM #2 ATTACHMENT #1 PAGE 9 QF 37 3.07 SITE MANAGEMENT A. Monitoring: The Contractor shall have constant monitoring of the pipelines and designated dewatering site during dredging operations. The personnel monitoring shall be in radio contact with the dredge at all times. The Contractor shall expand radio contact to include a designated City representative for emergency response purposes. B. Lagoon Embankments/Levees: The Contractor shall prevent damage to any existing embankment/levee. Any damage shall be repaired at the Contractor's expense. C. Washwater Return Pump Station Protection/Turbidity Curtain: Contractor shall provide a turbidity curtain or other form of protection from turbidity and sedimentation as approved by the Engineer, for the Washwater Return Pump Station and as indicated on the plans. 1. Lines, tie -downs and anchors shall be installed per manufacturer's recommendations. Generally, a Type II permeable turbidity curtain (for currents up to 1 knot or 1.69 feet per second) is sufficient for this application. Turbidity curtains that have been previously used in other water bodies must be properly cleaned to prevent the spread of invasive exotic species from other sites. If any materials (including turbidity curtains, bouys and chains) have been previously used, they shall be disinfected with vinegar or cleaned with hot water greater than 104 deg. F then allowed to completely dry for a minimum period of five days. If there are any questions about the occurrence of zebra mussels (Dreissena polymorpha), Giant salvinia (Salvinia molests), or other aquatic invasive species in a waterbody that you have worked in, are working in, or intend to work in, contact the Texas Parks and Wildlife Department. The remainder of section 3.07.0 is adapted from TxDOT Special Specification 5538 (2004). 2. Materials: The floating turbidity barrier supplied shall be a standard manufactured product. All materials shall be corrosion resistant. Materials at the water surface shall not degenerate when exposed to sunlight, oils, and petroleum products. The manufacturer shall supply a certification that the product supplied meets the requirements of this specification. The floating turbidity barrier consists of a PVC coated nylon section and a geosynthetic barrier/curtain section, load line, mooring lines, adjustment lines and tie -downs, floatation, ballast, anchors, mooring buoys, and lighted buoy. a. Turbidity Barrier/Curtain: The Turbidity Barrier/curtain geosynthetics shall have the following properties: • The top section shall consist of an 18-22 oz. per square yard PVC coated nylon fabric. It shall be a bright yellow or orange color to be easily seen. • The curtain material shall consist of a tightly woven monofilament yarn filter fabric as specified below: Property ASTM Test Method Value Weight ASTM D-4632 6.2 oz/sq. yd Tensile Strength ASTM D-4632 390 x 280 lbs ADDENDUM #2 ATTACHMENT #1 PAGE 10 OF 37 Trapezoidal Tear Strength ASTM D-4533 100 x 60 lbs Burst Strength ASTM D-3786 530 psi Puncture Strength ASTM D-3787 140 lbs Elongation ASTM D-4632 25 % UV Resistance ASTM D-4355 90 % Retained E.D.S. *CW -02215 70 US Standard Sieve *US Army Corps of Engineers Civil Works Construction Guide Specification CW -02215, "Plastic Filter Fabric • Be a woven material such that the equivalent opening size, E.O.S., cannot be enlarged under pressure or by being snagged. b. Floatation: Turbidity barrier/curtain floatation material shall be a closed cell solid foam material which has sufficient buoyancy to provide the curtain with continuous support, and a minimum of 6 inches freeboard. The sections of floatation shall be installed such that they cannot move along inside the sleeve and the space between sections shall not be more than twice the thickness of the floatation material. c. Load Lines: Load lines shall be minimum 1/4 in to 5/16 in. vinyl coated galvanized aircraft cable with 9800 Ib. breaking strength. The load line shall have galvanized connectors with tool free disconnect. d. Mooring Lines: Adjustment lines shall be minimum 1/2 in. nylon rope. e. Adjustment Line Tie -Downs: Adjustment lines and tie down lines shall be minimum 1/2 in. nylon rope. f. Ballast: Ballast shall be minimum 1/4 in to 5/16 in. galvanized steel chain. g. Anchors: Turbidity barrier/curtain anchors shall have a sufficient mass and spaced to secure the barrier as recommended by the manufacturer depending on the current velocities. Expected current velocity is less than 0.5 feet per second. h. Mooring Buoys: Mooring buoys shall have provisions for the mooring line to be securely attached and be sufficiently buoyant to remain afloat under normal load conditions. along tho outer navigable channel 3. Construction: Construction methods, workmanship, equipment and materials used hall conform to the various items of the standard specifications which govern the items of work to be performed under this contract and as specified on the plans. Place the barrier prior to commencement of any work that could impact the area of concern. Ensure that the type of barrier used and the deployment and maintenance of the barrier will minimize dispersion of turbid water from the excavation and dredging area. Operate the turbidity barrier in such a manner to avoid or minimize the degradation of the water quality of surrounding waters. ADDENDUM #2 ATTACHMENT #1 PAGE 11 OF 37 The barrier shall have sufficient ballast to anchor the barrier along the channel bottom. The Contractor will immediately repair or replace defective or damaged portions of the turbidity curtain. The turbidity curtain will remain in place until such time that water contained within is free from turbidity. The curtain shall be removed within 72 hours after this determination has been made. If required, the area behind the turbidity curtain will be cleaned prior to removal. D. Spill control, SWPPP, and storm water permits and regulations are to be complied with by Contractor and costs are subsidiary to the unit price per dry ton. 3.08 QUALITY CONTROL A. General: The Contractor shall establish and maintain a quality control system for dredging operations to assure compliance with the contract requirements and record the inspections and tests under this system, including but not limited, discharge effluent and spillage from the dredging equipment into the lagoons. B. Spill Contingency Plan: The Contractor shall provide and maintain an effective dredge spill contingency plan that includes the following as a minimum. 1. The Contractor shall identify and have available the names and phone numbers of companies having portable hydraulic dredges or vacuum pumps ready to clean up any dredge/residuals material discharged from the site. 2. The Contractor's Dredge Spill Contingency Plan shall include the following procedures to be followed in the event of an emergency or accident: a. The dredge shall cease operations immediately. b. The Contractor shall immediately notify the City, Water Division, or the designated City representative via radio contact or cell phone. c. Contractor shall submit a specific clean-up plan to the City for approval. No clean-up actions will commence until the plan has been approved. All clean- up of misplaced or spilled material shall be at the Contractor's expense. C. Dewatered Residuals Samplina and Testina: Contractor shall sample and test the residuals removed from the lagoons and hauled to the disposal site according to the schedule below. Description Sampling Frequency Test Method Testing Frequency Percent Solids Every Load Standard Method 2540G (or EPA Method 1684 or 0160.3 if 2540G is not available from lab). Daily Composite Paint Test Filter Every Load EPA Method 90956 Every Load (once Contractor and once landfill by by TCLP Every 25,000 CY EPA Method 1311 Every 25,000 CY TPH Every 25,000 CY TCEQ Method 1005 Every 25,000 CY ADDENDUM #2 ATTACHMENT #1 PAGE 12 QF 37 Percent Solids: CONTRACTOR shall make a daily composite sample of residuals transported from the facility which is comprised of individual representative samples taken from each truck leaving the site on a given day. Percent solids test results shall be reported to the Engineer daily. a. The sample(s) shall be stored throughout the day in airtight containers and in a manner that will preserve the integrity of the sample(s). b. The daily composite sample shall be tested by an independent laboratory, contracted by and paid for by the CONTRACTOR, to determine percent total solids (%TS) of the dewatered residuals. c. Percent total solids content shall be determined following established laboratory procedures as specified in Test 2540G of the most recent edition of "Standard Methods". If the selected laboratory does not perform Standard Method 2540G another method may be requested for Engineer's approval. d. The samples taken to make the composite sample shall be taken directly from the container used for hauling. e. No material is to be added to the container after the sample has been taken. f. The sample shall be taken from at least four (4) inches below the top surface of the residuals in the load and shall not be taken from within four (4) inches of any perimeter of the load (i.e. sides, bottom, top, front, or back of the container). All samples taken in a single day shall be of a uniform volume. All samples on any day shall be a minimum volume of 100 mL and no more than 250 mL, or as otherwise directed by the testing laboratory. h. Samples shall not be compressed into containers. Containers shall be overfilled and the lid secured to the overfilled container so as to shed any excess material in the process of securing the lid. Samples may be collected using a plastic or metal scoop, plastic or metal coring device, or other tool to facilitate proper sampling. Contractor may make the composite sample in one of the following ways: 1) Directly after each individual truck sample is taken, or 2) After the last load of the day has been accepted at the landfill, or 3) May have the lab make the composite sample. In all cases, the composite sample must contain equal volumes of each individual sample and be kept in an air tight container until the time of testing. k. All individual load samples will have a unique sample ID number as detailed below or an alternate unique numbering system as submitted to, and approved by, the Engineer. g. 1 - Sequential Sample Number Starting at 1 for the first load each day. Date (YYYYIMM/DD) Unique Truck/Container ID # ADDENDUM #2 ATTACHMENT #1 PAGE 13 OF 37 xx- xxxx/xx/xx- The Unique Truck/Container ID is determined by the Contractor for each hauling container. A key showing the Unique ID corresponding the TCEQ registration number shall be submitted to the Engineer for approval and reference. m. Each sample shall also be marked with the time that the sample was taken. n. Each daily composite sample will be labeled with the date corresponding to the date of all samples incorporated into the composite sample. o. The City and Engineer reserve the right to make a split sample of any percent solids samples taken by the Contractor and have them tested to validate results. In the event that the results vary by 5% Total Solids or more the average of the two results will be used for payment of that days load. If deviations of 5% or more occur repeatedly or frequently sampling and testing procedures will be reviewed and adjusted to eliminate the unnecessary introduction of error. 3.09 RECORD OF ACTIVITIES A. Daily Operations Report The Contractor will be required to prepare and maintain a daily summary report of all operations and furnish legible copies thereof to the Engineer. The daily summary report should include information including: 1. Total hours work was performed 2. Total number of each trade on site and approximate hours worked 3. Equipment on-site and in use 4. Weather (beginning temp, ending temp, rain recorded, general description) 5. Total number of loads removed from ONSWTP. 6. Trip Tickets for each load shall be submitted to the Engineer on a weekly basis. B. Monthly Operations Report Upon submittal of the monthly invoice the Contractor shall submit a Monthly Operations Report that shall The Contractor will be required to prepare and maintain a daily summary report of all operations and furnish legible copies thereof to the Engineer. The daily summary report should include information including: 1. All data required for federal, state and local reports, 2. Amount (cost and percentage of total invoice) of work applicable for MWBE goals, 3. Summary of costs including transportation, disposal, equipment maintenance, system operation 4. Total monthly polymer usage in applicable units as purchased from manufacturer. 5. Record of each load hauled for each day in the reporting period, including: a. Gross Weight ADDENDUM #2 ATTACHMENT #1 PAGE 14 OF 37 b. Tare Weight c. Net load weight d. Daily percent solids test results e. Total Dry Tons 6. Any operational issues encountered during the reporting period 7. Reports of analytical testing conducted during the reporting period solids, TCLP, and TPH) 8. All disposal Manifests and Trip Tickets meeting the requirements 312. 3.10 EQUIPMENT REMOVAL/DISPOSAL SITE CLOSURE (including percent of TCEQ Chapter A. General: Upon completion of the work, promptly remove equipment, including pipelines, buoys, and other markers or obstructions placed by or for the Contractor. PART 4MEASUREMENT AND PAYMENT 4.01 MEASUREMENT A. Pre Dredge Survey: Refer to the drawings for recent pre dredge survey of the North/South Lagoons. Should the Contractor take exception, he may perform his own survey at his own cxpcncc for consideration by the Enginccr. However, the Enginccr shall be given the Registered Professional Land Surveyor in the State of Texas. C. Measurement of water treatment residuals dredging, dewatering and hauling will be made based on the unit price bid of dry tons of solids removed. Dry tons of solids removed will be measured by multiplying the %TS of each days composite sample by the total weight of all loads delivered to the landfill for the corresponding day as reported on the TCEQ Chapter 312 compliant trip tickets. The formula for measurement and payment is provided below. %TS (Daily Composite) x [Gross Weight — Tare Weight (in tons)] = Dry Tons/truck Dry Tons/truck x bid unit price per dry ton = payment to Contractor per truck The monthly invoice amount will be the sum of all payments to Contractor per truck during the respective pay period plus any mobilization or percent complete on any other bid item. D. Mobilization will be measured as specified in section 01 29 01 Measurement and Basis for Payment. E. Aquatic Vegetation Removal will be measure as specified in section 01 29 01 Measurement and Basis for Payment. 4.02 PAYMENT Payment for dredging, dewatering, and hauling shall be on a unit price basis per dry ton (DT) and must be fully substantiated with official measurements (See Section 4.01 Measurement above). All other work, materials, permits, fuel costs, water service, electrical service, turbidity curtain and any ADDENDUM #2 ATTACHMENT #1 PAGE 15 QF 37 temporary or permanent improvements installed necessary to complete the Scope of Work are considered subsidiary to this pay item. Only Mobilization and Aquatic Vegetation Removal will be paid separately. END OF SECTION ADDENDUM #2 ATTACHMENT #1 PAGE 16 OF 37 Attachment A to Technical Specification 46 76 11 Dredging, Dewatering and Hauling Requirements Sample Trip Ticket ADDENDUM #2 ATTACHMENT #1 PAGE 17 OF 37 Trip Ticket Number : Generator Info Name: O.N. Stevens Water Treatment Plant (Address: 13101 Leopard Dr City: Corpus Christi 'State: TX 'zip: 78401 'Phone: (361) 826 1200 Indicate the Waste Type (must check one) and, ❑ Wastewater Treatment Plant Sludge ❑ Chemical Toilet ❑ Wastwater from Sanitary Sewer System ❑� Other (Specify Source and Type of Waste if applicable, the interceptor ❑ Food Service ❑ Septic/Sewage ❑ Grit/Mud/Lint/Oil Water Treatment (or trap) capacity: Grease Trap Holding Tank Trap Plant Residuals Capacity = (gal.) Capacity= (gal.) Capacity = (gal.) Dry Tons Removed: 'Date Removed: As the representative for the generator of this transported to a facility authorized by the Texas Printed Name: waste, I certify that the information Commission of Environmental provided is true Quality (TCEQ) to Signature: and correct; and that this waste is to be receive these wastes. Transporter Info Business Name: 'Address: City: 'State: Zip: 'Phone: TCEQ Registration Number: Vehicle License Number: Tare Weight: 'Gross Weight: 196 Total Solids Lab Result: Dry Tons Transported: 'Date Relinquished: As the representative for the transporter of this in accordance with Title 30 of the Texas Administrative Printed Name: waste, I certify that the information Code, Chapter 312, provided is true Subchapter G. Signature: and correct and that this waste was collected Transfer Info Note: This section is for documenting transfers of wastes between vehicle a Type V facility that is either operation under the same permitted by or registered TCEQ Registration Number. The transfer of with the TCEQ. waste to any secondary transporter must be at 1. Was this waste transferred to the vehicle identified If YES, indicate the previous Manifest/Trip Ticket 2. Is his waste being transferred from the vehicle IF YES, complete the section below for the vehicle Info" and the original "Generator Info" (duplication above from a previous No. here: identified above to a different accepting this waste and of the generator's signature transporter vehicle? (new) transporter initiate a new Manifest/Trip would not be required). vehicle? Ticket including the new "Transporter New Manifest/Trip Ticket Number: New Vehicle License Number: Dry Tons Transferred: Transfer Date: As the representative for the transporter receiving Printed Name: this transferred waste, I certify that the information Signature: provided is true and correct. 1 Receiver Info Facility Name: Cefe Valenzuela Landfill 'Address: 2397 Co Rd 20 City: Robstown 'State: TX Zip: 78380'Phone: (361) 826-8035 Check One: 1 Disposal ❑ Permitted ❑ Registered Site Transfer Station Transfer Station TCEQ Type I or Type or TCEQ Registration V Permit No.: No.: Tare Weight: Gross Weight: 96 Total Solids Lab Result: Dry Tons Received: Date Received: Time Received: As the representative for the facility receiving this - The TCEQ has authorized this facility to accept - The water was received by this facility on the - The waste has been transferred , recycled, or Printed Name: waste, I certify that : the waste specified under date and time indicated; and disposed of as required by "Generator Info" above; the TCEQ authorization Signature: for this facility. ADDENDUM #2 ATTACHMENT #1 PAGE 18 OF 37 Attachment B to Technical Specification 46 76 11 Dredging, Dewatering and Hauling Requirements City of Corpus Christi Hauler Permit Requirements REVISION #1 for ADDENDUM #2 ADDENDUM #2 ATTACHMENT #1 PAGE 19 OF 37 HAULER PERMITS General Instructions and Information All haulers of solid waste are required to have permits. Permits are valid from October 1st through September 30th of each year. There are two classifications of solid waste haulers affected by the permitting process and they are as follows: • Permitted Solid Waste Self -Hauler & Landscaper: Any person, business, commercial establishment, or industrial facility, other than a residential customer that collects, transports, or disposes of solid waste generated by the person, business, commercial establishment, or industrial facility, who has a solid waste hauler permit issued under Article VIII of the ordinance. Permit fee is $5Olyear. • Permitted Solid Waste Hauler for Hire: Any person that collects, transports, or disposes of solid waste of another person and who has a solid waste hauler permit issued under Article VIII of the ordinance. Permit fee is $1 DOlyear. Reporting Requirements: Each permitted solid waste hauler for hire shall submit a monthly certified statement on a form (provided by the City) to the Director showing the total Municipal Solid Waste System Service Charges (MSWSSC)* collected from solid waste customers who are located within the city, and the total MSWSSC fees that were billed to solid waste customers, but uncollected by the permitted solid waste hauler. (See Exhibit 6) *Municipal Solid Waste System Service Charge (MSWSSC): The purpose of the Municipal Solid Waste System Service Charge (MSWSSC) is to fairly assess solid waste system costs to the generators of waste in our city. Each statement must be accompanied by an affidavit signed by an officer of the permitted solid waste hauler for hire before a notary public that certifies that the information is true and accurate. On the 15th day of each month, the solid waste hauler for hire must submit the form outlined above for the previous month. The solid waste hauler must fill out the form with yardage and/or tonnage collected by category, total the MSWSSC owed for the previous month, and submit with a check to the City. Penalty for late MSWSSC Payment: If payment in full is not made on or before the due date (15th day of each month), the hauler shall pay an administrative late fee of $100 and any amount remaining unpaid shall bear interest at the rate of one and one half (1%) percent per month or the highest rate that may be lawfully charged, whichever is less, from the due date to the actual date of payment. Distribution of Permits & Stickers: Permits and stickers will be issued following receipt of a completed application, payment of required fees, and review of insurance by Risk Management and final approval by the Director of Solid Waste Operations or his designated representative. In addition to the permit fee, there is a yearly sticker fee of $1 per vehicle, trailer, or container. The yellow permit number sticker fee for new haulers or lost stickers will be $5.00. The stickers will be placed on the driver's side fender of the vehicle, trailer, or container in an unobstructed location that is clearly visible. Please ensure: V Application is fully completed and notarized ✓ includes copies of required insurances ✓ you have a copy of your current driver's license ✓ a copy of sales tax permit payment of the required fees in the form of a check or money order to avoid delays in processing the application. Liability Insurance Requirements: Please note that the City MUST be named as an additional insured with a waiver of subrogation on all certificates. ADDENDUM #2 ATTACHMENT #1 PAGE 20 QF 37 City of Corpus Christi Solid Waste Operations 2016 - 2017 Commercial Hauling Permit Application Date of application: 1.) Applicant Name: FOR OFFICE USE Permit #: Approval Date: (Last) (First) 2.) Applicant Business Name: 3.) Business Physical Address: (Street Name & #) (City) 4.) Business Mailing Address: (State) (Zip) (P.O. Box or Street Name & #) (City) (State) (Zip) 5.) Business Phone Number: ( ) 6.) Business Fax Number: ( ) 7.) E-mail Address (if any): 8.) Number of vehicles the applicant desires to operate: 9.) Location where vehicles will be stored when not in use: 10.) List vehicles / containers / dumpsters to be operated on Attachment I (MUST include year 1 make / model, vehicle identification number, and license plate number). 11.) Provide description of the nature and character of service rendered to customers: 12.) Provide a description of the areas of the City in which the applicant proposes to provide service: ADDENDUM #2 ATTACHMENT #1 Hauling PermEter9fediclage 1 of 2 13.) Will service be provided to customers or premises located outside the City of Corpus Christi city limits? (Please circle) Yes No 14.) If applicant is a Self Hauler, please identify the types of waste generated and the type of activity from which the waste is generated: 15.) A copy of the applicant's sales tax permit issued by the Texas Comptroller of Public Accounts must be attached to this application (when applicable). I, (Owner/Designee) DO HEREBY ATTEST THAT ANY SOLID WASTE COLLECTED OR TRANSPORTED WITHIN THE CITY WILL BE DISPOSED OF AT A FACILITY THAT IS AUTHORIZED BY THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY TO ACCEPT THE TYPE OF SOLID WASTE THAT (Business Name) HAS COLLECTED OR TRANSPORTED AND THAT ALL FEDERAL, STATE OF TEXAS, AND LOCAL LAWS WILL BE COMPLIED WITH WHEN PERFORMING PURSUANT TO THE CITY PERMIT. (Owner/Designee Signature) (Date) , certify that I have applied to the Department of Solid Waste Operations of the City of Corpus Christi, Texas for a solid waste hauling permit, and that the information provided by me in this application is true and correct. (Owner/Designee Signature) (Date) THIS SECTION FOR NOTARIZATION PURPOSES: State of Texas County of Before me, a notary public, on this day personally appeared , known to me (or proved to me on the oath of or through (description of identity card or other document)) to be the person whose name is subscribed to the foregoing document and, being by me first duly sworn, declared that the statements therein contained are true and correct. Notary Public's Signature Hauling Permit Application Form, Page 2 of 2 ADDENDUM #2 ATTACHMENT #1 PAGE 22 OF 37 Application for Solid Waste Vehicle Registration Sticker* Applicant Name: *Registration fee: $1 1 vehicle. Registration is for each vehicle used to transport solid waste within the City or to a City owned solid waste facility. 1 2 Year:. Make & Model: Vehicle Identification # (VIN): License Plate #: Tare Weight: Gross Weight: Total Cubic Capacity of Body: Year: Make & Model: Vehicle Identification # (VIN): License Plate #: IHHIIIWIILHIHI Tare Weight: Gross Weight: Total Cubic Capacity of Body: 3 Year: Make & Model: Vehicle Identification # (VIN): License Plate #: Tare Weight: Gross Weight: Total Cubic Capacity of Body: 4 Year: Make & Model: Vehicle Identification # (VIN): License Plate #: Tare Weight: Gross Weight: Total Cubic Capacity of Body: 5 Year: Make & Model: Vehicle Identification # (VIN): License Plate #:. Tare Weight: Gross Weight: Total Cubic Capacity of Body: Hauling Permit Attachment I, Page 1 of 4 ADDENDUM #2 ATTACHMENT #1 PAGE 23 OF 37 Application for Solid Waste Vehicle Container Registration Sticker* Applicant Name: *Registration fee: $1 1 container (only if the container is a roll -off that transports debris to the landfill). Set 1 Name of Container Manufacturer: Container Model: Total Number of Containers in Set 1: Total Cubic Capacity of Container: Tare Weight: Set 2 Name of Container Manufacturer: Container Model: Total Number of Containers in Set 2: Total Cubic Capacity of Container: Tare Weight: Set 3 Name of Container Manufacturer: Container Model: Total Number of Containers in Set 3: Total Cubic Capacity of Container: Tare Weight: Set 4 Name of Container Manufacturer: Container Model: Total Number of Containers in Set 4: Total Cubic Capacity of Container: Tare Weight: Set 5 Name of Container Manufacturer: Container Model: Total Number of Containers in Set 5: Total Cubic Capacity of Container: Tare Weight: Hauling Permit Attachment I, Page 2 of 4 ADDENDUM #2 ATTACHMENT #1 PAGE 24 OF 37 Application for Solid Waste Dumpster Registration Sticker* Applicant Name: Location where dumpsters will be stored when not in use: Nature and character of the service the applicant proposes to render within the City: Statement of whether or not the service will be provided to any premises not located in the City: `Registration fee: $1 1 dumpster (no sticker required if the dumpster is not transported to the landfill). Set 1 Name of Dumpster Manufacturer: Dumpster Model: Total Number of Dumpsters in Set 1: Gross Weight of Dumpster: Total Cubic Capacity of Dumpster: Tare Weight of Dumpster: Set 2 Name of Dumpster Manufacturer: Dumpster Model: Total Number of Dumpsters in Set 2: Gross Weight of Dumpster: Total Cubic Capacity of Dumpster: Tare Weight of Dumpster: Set 3 Name of Dumpster Manufacturer: Dumpster Model: Total Number of Dumpsters in Set 3: Gross Weight of Dumpster: Total Cubic Capacity of Dumpster: Tare Weight of Dumpster: Hauling Permit Attachment I, Page 3 of 4 ADDENDUM #2 ATTACHMENT #1 PAGE 25 OF 37 Application for Solid Waste Can Account* The definition for "can account" per Chapter 21, Article I, Section 21-1, of the Code of ordinances is as follows: "Can account: A commercial or residential account who sets out its solid waste in conventional refuse receptacles of 100 gallons or less capacity for collection by a permitted solid waste hauler." Applicant Name: *Each solid waste hauler's permit holder shall register each service stop where it collects solid waste from a can account located within the City. Hauling Permit Attachment I, Page 4 of 4 ADDENDUM #2 ATTACHMENT #1 PAGE 26 OF 37 Address of Can Account: Frequency of Service Provided to Can Account: Number of Receptacles: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hauling Permit Attachment I, Page 4 of 4 ADDENDUM #2 ATTACHMENT #1 PAGE 26 OF 37 EXHIBIT INSURANCE REQUIREMENTS I. HAULERS FOR HIRE - LIABILITY INSURANCE A. Haulers for Hire must not commence work under this contract until all insurance required has been obtained and such insurance has been approved by the City. Haulers for Hire must not allow any subcontractor to commence work until all similar insurance required of any subcontractor has been obtained. B. Haulers for Hire must furnish to the City's Risk Manager and Director of Solid Waste, one (1) copy of Certificates of Insurance with applicable policy endorsements showing the following minimum coverage by an insurance company(s) acceptable to the City's Risk Manager. The City must be listed as an additional insured on the General liability and Auto Liability policies, and a waiver of subrogation is required on all applicable policies. Endorsements must be provided with Certificate of Insurance. Project name and/or number must be listed in Description Box of Certificate of Insurance. TYPE OF INSURANCE MINIMUM INSURANCE COVERAGE 30 -day advance written notice of cancellation, non -renewal, material change or termination required on all certificates and policies. Bodily Injury and Property Damage Per occurrence - aggregate Commercial General Liability including: 1. Commercial Broad Form 2. Premises — Operations 3. Products/ Completed Operations 4. Contractual Liability 5. Independent Haulers for Hires 6. Personal Injury- Advertising Injury $100.000 Per Occul ence AUTO LIABILITY (including) 1. Owned 2. Hired and Non -Owned 3. Rented/Leased $250,000 Combined Single Limit C. In the event of accidents of any kind related to this contract, Haulers for Hire must furnish the Risk Manager with copies of all reports of any accidents within 10 days of the accident. II. ADDITIONAL REQUIREMENTS A. Haulers for Hire shall obtain and maintain in full force and effect for the duration of this Contract, and any extension hereof, at Haulers for Hire's sole expense, insurance coverage written on an occurrence basis by companies authorized and admitted to do business in the State of Texas and with an A.M. Best's rating of no less than A- VII. B. Haulers for Hire shall be required to submit a copy of the replacement Certificate of Insurance to City at the address provided below within 10 days of any change made by the Haulers for Hire or as requested by the City. Haulers for Hire shall pay any costs incurred resulting from said changes AKIDEbIthdifider this ATTACHMENT #1 PAGE 27 OF 37 Exhibit shall be given to City at the following address: City of Corpus Christi Attn: Risk Manager P.O. Box 9277 Corpus Christi, TX 78469-9277 C. Haulers for Hire agrees that, with respect to the above required insurance, all insurance policies are to contain or be endorsed to contain the following required provisions: • List the City and its officers, officials, employees, and volunteers, as additional insureds by endorsement with regard to operations, completed operations, and activities of or on behalf of the named insured performed under contract with the City, with the exception of the workers' compensation policy; • Provide for an endorsement that the "other insurance" clause shall not apply to the City of Corpus Christi where the City is an additional insured shown on the policy; • Provide thirty (30) calendar days advance written notice directly to City of any, cancellation, non- renewal, material change or termination in coverage and not less than ten (10) calendar days advance written notice for nonpayment of premium. D. Within five (5) calendar days of a cancellation, non -renewal, material change or termination of coverage, Haulers for Hire shall provide a replacement Certificate of Insurance and applicable endorsements to City. City shall have the option to suspend Haulers for Hire's performance should there be a lapse in coverage at any time during this contract. Failure to provide and to maintain the required insurance shall constitute a material breach of this contract. E. In addition to any other remedies the City may have upon Haulers for Hire's failure to provide and maintain any insurance or policy endorsements to the extent and within the time herein required, the City shall have the right to order Haulers for Hire to stop work hereunder, and/or withhold any payment(s) which become due to Haulers for Hire hereunder until Haulers for Hire demonstrates compliance with the requirements hereof Nothing herein contained shall be construed as limiting in any way the extent to which Haulers for Hire may be held responsible for payments of damages to persons or property resulting from Haulers for Hire's or its subcontractor's performance of the work covered under this contract. It is agreed that Haulers for Hire's insurance shall be deemed primary and non-contributory with respect to any insurance or self insurance carried by the City of Corpus Christi for liability arising out of operations under this contract. H. It is understood and agreed that the insurance required is in addition to and separate from any other obligation contained in this contract. 2016 Insurance Requirements Solid Waste Department. Haulers for Hire ADDENDUM #2 ATTACHMENT #1 PAGE 28 OF 37 EXHIBIT INSURANCE REQUIREMENTS I. SELF -HAULERS - LIABILITY INSURANCE A. Self -Haulers must not commence work under this contract until all insurance required has been obtained and such insurance has been approved by the City. Self -Haulers must not allow any subcontractor to commence work until all similar insurance required of any subcontractor has been obtained. B. Self -Haulers must furnish to the City's Risk Manager and Director of Solid Waste, one (1) copy of Certificates of Insurance with applicable policy endorsements showing the following minimum coverage by an insurance company(s) acceptable to the City's Risk Manager. The City must be listed as an additional insured on the General liability and Auto Liability policies, and a waiver of subrogation is required on all applicable policies. Endorsements must be provided with Certificate of Insurance. Project name and/or number must be listed in Description Box of Certificate of Insurance. TYPE OF INSURANCE MINIMUM INSURANCE COVERAGE 30 -day advance written notice of cancellation, non -renewal, material change or termination required on all certificates and policies. Bodily Injury and Property Damage Per occurrence - aggregate Commercial General Liability including: 1. Commercial Broad Form 2. Premises — Operations 3. Products/ Completed Operations 4. Contractual Liability 5. Independent Self-Haulerss 6. Personal Injury- Advertising Injury $100.000 Per Occturence AUTO LIABILITY (including) 1. Owned 2. Hired and Non -Owned 3. Rented/Leased $250,000 Combined Single Limit C. hi the event of accidents of any kind related to this contract, Self -Haulers must furnish the Risk Manager with copies of all reports of any accidents within 10 days of the accident. II. ADDITIONAL REQUIREMENTS A. Self -Haulers shall obtain and maintain in full force and effect for the duration of this Contract, and any extension hereof, at Self-Haulers's sole expense, insurance coverage written on an occurrence basis by companies authorized and admitted to do business in the State of Texas and with an A.M. Best's rating of no less than A- VII. B. Self -Haulers shall be required to submit a copy of the replacement Certificate of Insurance to City at the address provided below within 10 days of any change made by the Self -Haulers or as requested by the City. Self -Haulers shall pay any costs incurred resulting from said changes A AIMENOVIAttaler this ATTACHMENT #1 PAGE 29 OF 37 Exhibit shall be given to City at the following address: City of Corpus Christi Attn: Risk Manager P.O. Box 9277 Corpus Christi, TX 78469-9277 C. Self -Haulers agrees that, with respect to the above required insurance, all insurance policies are to contain or be endorsed to contain the following required provisions: • List the City and its officers, officials, employees, and volunteers, as additional insureds by endorsement with regard to operations, completed operations, and activities of or on behalf of the named insured performed under contract with the City, with the exception of the workers' compensation policy; • Provide for an endorsement that the "other insurance" clause shall not apply to the City of Corpus Christi where the City is an additional insured shown on the policy; • Provide thirty (30) calendar days advance written notice directly to City of any, cancellation, non- renewal, material change or termination in coverage and not less than ten (10) calendar days advance written notice for nonpayment of premium. D. Within five (5) calendar days of a cancellation, non -renewal, material change or termination of coverage, Self -Haulers shall provide a replacement Certificate of Insurance and applicable endorsements to City. City shall have the option to suspend Self-Haulers's performance should there be a lapse in coverage at any time during this contract. Failure to provide and to maintain the required insurance shall constitute a material breach of this contract. E. In addition to any other remedies the City may have upon Self-Haulers's failure to provide and maintain any insurance or policy endorsements to the extent and within the time herein required, the City shall have the right to order Self -Haulers to stop work hereunder, and/or withhold any payment(s) which become due to Self -Haulers hereunder until Self -Haulers demonstrates compliance with the requirements hereof. Nothing herein contained shall be construed as limiting in any way the extent to which Self -Haulers may be held responsible for payments of damages to persons or property resulting from Self-Haulers's or its subcontractor's performance of the work covered under this contract. G. It is agreed that Self-Haulers's insurance shall be deemed primary and non-contributory with respect to any insurance or self insurance carried by the City of Corpus Christi for liability arising out of operations under this contract. H. It is understood and agreed that the insurance required is in addition to and separate from any other obligation contained in this contract. 2015 Insurance Requirements Solid Waste Department. Self -Haulers 7/28/2015 ds Risk Management ADDENDUM #2 ATTACHMENT #1 PAGE 30 QF 37 EXHIBIT B Fees for Payment of MSWSSC for Permitted Haulers WSSC is only paid on solid waste collected inside the city limits (ICL) WASTE COLLECTED IN THE CITY TYP • OF CUSTO R BASE TIP FEE STATE FEE MSWSSC T• AL Cash by Weigh $35.61/Ton $1.25/Ton $10.24ITon $47.101Ton Cash by Loose CY Not Weighed $9.94/CY $.051CY $0.311CY $10.301CY Cash - Compacted Load Not Weighed/CY $12.9. CY $.251CY $0 1/CY $13.521CY Cash - Construction & Demolition Debris/CY $12.9161CY $.25/CY $0.31CY $13.521CY Cash -Heavy Brush & Yard Waste/CY $12.9161CY 251 $0.311CY $13.521CY *Cash wlPut or Pay Contract $26.71/Ton .251T• $15.14/Ton or $0.911CY $43.10 ($15.14/Ton or $0.911CY) **Account w!Put or Pay Contract $25.711Ton $1.25/Ton $15.14/Ton or $0.911CY $43.10 ($15.14/Ton or $0.91 CY) **Account w/o Put or Pay Contract $35.6 on $1.25/Ton ', 1.24ITon or $0. CY $47.10 ($10.24ITon or $0.311CY) Hauler Disposing at Non -City Site -0- -0- $34.57 or $1.401CY $34.57/Ton or $1.40ICY *Any mixed loads will be assessed the MSWSSC. **All MSWSSC fees ust be remitted by the 15th day of the month following collection by th- •ermitted hauler. MSWSSC Collection Fees, Page .f 2 ADDENDUM #2 ATTACHMENT #1 PAGE 31 OF 37 WASTE COLLECTED OUTSIDE THE CITY TYPE OF CUSTOMER BASE TIP FEE STATE FEE MSWSSC TOTAL Cas by Weight $35.61/Ton $1.25/Ton NONE $36.861T' Cash b oose CY Not Weigh - $9.94CY $.051CY NONE $' ' 9/CY Cash Compacted Load Not Weighed/CY $12.961CY $.25/CY NONE $13.211CY Cash Construction & Demolition Debris/CY $1 '• 6/CY $.251CY N s. $13.21/CY Cash Heavy Brush & Yard Waste/CY $12.961CY $.251CY NONE $13.211CY Cash w/Put or Pay Contract $26.71/Ton $1.25/To NONE $27.96/Ton Account wfPut or Pay Contract $26.71/Ton $1. '. Ton NONE $27.961Ton Account w/o Put or Pay Contract $35.61/Ton $1.25/Ton NONE $36.861Ton Hauler Disposing At Non -City Site N/A N/A N/A N/A h1SWSsC OJEQIi isIE NVb 2 of 2 ATTACHMENT #1 PAGE 32 OF 37 MSWSSC Remittance Form Report ■ Period: From To Permit Hal r Name: Solid to collected from inside the City limits (ICL) and disposed at a City -owned Ian mount Charge per Ton / Cubic Yard Total $ Collecte or can account pickups PERMIT #: Tons X = *Cubic Yards X = $ Can Accounts = $ Roll -off Containers = $ Corpus Christi Municipal Code, Sec. 21-4 (3) 0.5% credit = $< * Size of containers multiplied by the frequency o Tota $ service totaled for all accounts serviced. Solid Waste collected from inside the City limits (I • ) d disposed at other than City -owned landfill: Tons Amount Charge per To / Cu • Yard Total $ Collected or can ac unt pick s *Cubic Yards Can Accounts Roll -off Containers Corpus Christi Municipal Code, - -c. 21-47(c)(3) 8.5% credit * Size of containers multiplie y the frequency of service totaled for all . counts serviced. Total: 1. Fees collected current month 2. less: 0.5% • count (line 1 x .005) $ 3. Amount r itted (enclose payment) $ 4. Prior f- . balance due from customers (prior month line 8) $ 5. Add. ee billed in current month $ 6. L=.s: Fees collected in current month (line 1 above) $ 7. ess: Over 60 days past due (attach separate list with copies of invoices) $ Ending balance / next month beginning balance $ MSWSSCiik6CCAPIABage 1 ❑ ATTACHMENT #1 PAGE 33 OF 37 MSWSSC. charges for solid waste disposed At a City -owned landfill: 1. Account • stomers with Put or Pay contract: $15. / ton $0.91 / cubic yard 2. Account cusers w/out Put or Pay contract: $10.241 t. $0.31 / cubic yard 3. Can Accounts: $4.17 per 1110 4. Roll -off Containers: (with Put or Pay) $2.40 / • bic yard capacity per collection (w/out Put or Pay) $0.821 c. is yard capacity per collection MSWSSC. charges for solid waste disposed at other than City -owned landfill: 1. All Permitted Haulers: $34.57 / ton 2. Can Accounts: $4.17 per mouth 3. Roll -off Containers: $3.69 / cubic yard capacity per colle $1.40 / cubic yar THE INFORMATION REPRESENTED ON THI YARDS COLLECTED IN THE CITY OF CORFU (Signature) (Aut ized Officer) DO HEREBY CERTIFY THAT LY REFLECTS THE TONNAGE OR CUBIC E PAST MONTH. TATEMENT ACCU HRISTI DURING THIS SECTION FOR NOTARIZATION PURPOSES: STATE OF COUNTY OF BEFORE ME, the undersigned authority, on th. known to me to be the person whose name i he/she executed the same for the purpose ate) day personally appeare• ubscribed to the foregoing i d consideration therein express GIVEN UNDER MY HAND AND SEAL i F OFFICE, this the day of (Notary Signature) trument and acknowledged to me that This form may be d • icated or additional copies obtained by contacting: Leticia Varela at • 1) 826-1965 or Norma Salinas at (361) 826-1977. Submit C • pleted Form & Payment before the 15th of the month to: ity of Corpus Christi Solid Waste Operations 2525 Hygeia Street Corpus Christi, TX 78415 ADDENDUM #2 ATTACHMENT #1 PAGE 34 OF 37 MSWSSC Remittance Form, Page 2 of 2 Required Records for Haulers for Hire (a) Each permitted solid waste hauler for hire shall maintain the following information in a format that can be readily examined by the Director or an independent auditor that is acceptable to both the Director and the permitted solid waste hauler for hire: (1) A list of all customers located within the City or an industrial district created by the City including: (A) The customer's name; (B) The physical address of each location that is serviced; (C) The size and service level of any container(s) provided at each service location; (D) Whether the container is a roll-on/roll-off container, e.g., a container that is picked up and transported on a vehicle chassis to a disposal site; (E) The classification of the solid waste collected, e.g., commercial hazardous, household waste, special waste; (F) Whether or not the solid waste is compacted before disposal; and (G) The frequency of collection. (2) A list of all customers located outside the City whose solid waste is taken to a facility owned by the City for disposal, including: (A) The customer's name; (B) The physical address of each location that is serviced; and (C) The type of solid waste collected from the customer. (3) The routes taken on a daily basis by any vehicle used to collect solid waste within the City or any vehicle that disposes of solid waste at a City owned facility that is collected from outside the City. (4) Copies of all reports filed with the Texas Comptroller of Public Accounts that relate to any services provided or activities conducted within the City. (b) The permitted solid waste hauler for hire shall make all records required to be maintained under subsection (a) of this section available to the Director or auditor at the permitted solid waste hauler for hire's place of business at any time during normal business hours for inspection. The Director or auditor will provide reasonable advance notice that the hauler's records will be inspected. (c) If the Director or auditor has reason to believe that the Municipal Solid Waste System Service Charge being remitted to the City by the solid waste hauler does not accurately reflect the tonnage and yardage of waste collected, size of container provided, level of service, or disposal site for a specific customer, the hauler shall provide copies of any specific records relating to that customer or transactions involving that customer that are requested by the Director or auditor. (d) Any records relating to individual customers provided to the Director or auditor under this section, except specific records considered by the Director in resolving inconsistencies between a solid waste hauler's statements submitted under section 21-47 and the records maintained under this section, will be treated by the City as privileged commercial information under Section 552.110 of the Texas Public Information Act, Chapter 552, Texas Government Code, if each page of information that is provided to the Director is clearly marked and identified as proprietary information that should not be made available to the public. If a request is received for the information, the request and information will be forwarded to the Texas Attorney General for a determination under Section 552.301 of the Act. The City will withhold the information from the requester under Section 552.305 of the Act until after the Attorney General's decision is received. The City will only release the information if directed to do so by the Attorney General. ADDENDUM #2 ATTACHMENT #1 PAGE 35 OF 37 FREQUENTLY ASKED QUESTIONS: 1. I haul trash from my business maybe once a month to keep the area clean. Do I need a permit to do this? Answer: Yes. 2. I haul yard waste and tree trimmings. I am usually charged by the cubic yard because I only use a pickup truck. Can I be charged by the ton, or am I restricted to cubic yards? Answer: We prefer to charge your load by the ton. 3. It seems to me that I am being penalized by being charged for cubic yards instead of tons. Answer: Tonnage is the most accurate form of measurement; using cubic yards is only an estimate. We will weigh all loads when applicable. 4. I am a permitted hauler and have to remit the $10.24 charge per ton to the City each month. When the City bills me, they give me a total due, no tonnage figure. I don't keep track of tonnage at my business. So on what do I base my payment? Answer: Tonnage is the most accurate form of measurement. For haulers who remit MSWSSC fees monthly or use a non -City owned landfill, you will now be required to track tonnages, cubic yards, or both, and remit the appropriate amount of MSWSSC to the City by the 15th of the month following the billing period. As a reminder, the City reserves the right, in accordance with City Ordinance, Chapter 21, to perform annual audits of haulers to ensure compliance of this requirement. 5. How can I find out more information about entering into a Put or Pay Agreement with the City? Answer: Contact Solid Waste Operations at (361) 826-1965. Information Contacts: Leticia Varela -- (361) 826-1965 Norma Salinas — (361) 826-1977 Fax -- (361) 826-1971 For Questions, Comments, or Complaints: Customer Call Center — (361) 826 -CITY (2489) Physical Address: City of Corpus Christi Solid Waste Operations 2525 Hygeia Street Corpus Christi, Texas 78415 ADDENDUM #2 ATTACHMENT #1 PAGE 36 OF 37 "Cover Your Load" tips: • Use a TARP big enough to completely cover your trailer or truck bed — a minimum of four inches should overlap the sides, front and back of your load. • Tightly secure the tarp with ropes, bungee cords, netting or straps. • Put lighter items at the bottom of the load. • When transporting large items, make sure they are tied down and secured to the trailer or truck so they don't move. • A tarp is not required if the debris is completely enclosed by a Toad -carrying compartment. • Make sure your trailer or truck bed does not have holes, cracks or other openings where debris can escape. • Don't overload — keep material level with the trailer or truck bed. • Before leaving the landfill, remove any loose material that may remain in the trailer or truck bed. In Texas, failing to cover your Toad to prevent materials from escaping by blowing or spilling out of your trailers or trucks is against the law and carries a fine of up to $500 for the first offense. Trailers or trucks not appropriately secured are subject to additional fees/charges at the City of Corpus Christi landfill or collection center. Don't Correct ADDENDUM #2 ATTACHMENT #1 PAGE 37 OF 37 Addendum #2 Attachment #2 Replacement Drawings r Igi g = 44- 17100 MOUPIALI IINtrsaSDAT' CITY OF CORPUS CHRISTI. TEXAS 0.11. STEVENS WATER TIIlAT WNT PLANT INTERMEDIATE SLUDOE REMOVAL PHASE 1 COVER SHEET ar ar A CORPUS CHRfSTJ TEXAS UT1LiiTES _ DEPARTMENT D.porfm.nf of Enyfn.rinp 5errrres { k IDOOM P V` umR ii TYPICAL LEGENDISYM SOLS 11 X11 311.= 52 x RN 7-, rig a0,„ 9 dug R 8 HH 22 � y E 0 n:II= u . xe:' p �� a F97 ns prvIR p... Rs z ;;;9,R5S:. -_ �- cr, _k 1i y ��R PR_R Rn_ 6 6-•.:aai., _ Ew a c 8 g. P A f ��z 4 i 8 gi $ ^ L9 5 GENERAL ABBREVIATIONS A 4 A 9 i q 5 d E. p . 13. a t� ., _ � v � g I v y A A ' 9 8 $ F ,By SY O C g i 1!j I # 4 N 4i zs ti z .�. g 5 F w 1i'Vt4 ID SYSTEM ADDENDUM #2 ATTACHMENT 2 SHEET 2 OF 5 ;d 3'98 $ic 9 Yom' c tri r. M S b AIR` m CITY OF CORPUS CHRISTI, TEXAS 0.N INSTEVENSR DIATE RTREATlE NT MOVAPLANT INT ER.N EDUITE SLUDGE RENOYAL PHASE 1 CITY OF OS CIINV - il CORPUS CHRISTI � •w a�a engineers I alcfilla 1a aurveWia _ ..unw�.wr ��g� .:: �j g! 4 r. 2 ggg A TYPICAL LEGEND AHD TESTING SC HE QULE _ _ UTILITIES .:. DEPARTMENT,.. Jeparfinenf e0 Fngf�erinp 5arvlces 1 " '_ 1 }g i•a yg @ EE 9 EEy� 9yf "-@ � I i ,j" gy p qqipp f go d{ a Y _ �� 7 '�„ [' Flpgy p YgC ^P @ � yy i g'}9�� @ 9 20 PPa , g! eg � R, 7R i € 1 ig$ g3 5 'yp� � r p 3 $ 3g g Gy g3 3 g t € ' �fp5�a 8 $$pp4 q] g a_� �ysg 3 �R` '� '�E P EE g1 gg}? yB . 7 € 8 pR i 5. fi 9q A} R 0� 1q g} r@ 1 @ gp ill k� } � A a4� �di �� � 3 ap � SN S ^" $$+�3 � q '� �7 04 4�4 a8� 5; [I e c F a 1.3p C 7@@Eqq$ it a1 � g2 y ayq $ F � F 'J 8 1, agg^ R r F�$ ,� a R a �' a T� F P a SS aRa 5�5 m ; fi� „ppp5 G 2 " Q 9 ' d m P: p m�ii 4 6' F - 0 ,1 3 a O i A 8 as P ti 0 � � S �� s � 10, raqa I c pa^ R Y R . . o " .. ,. s a a� pa {jogg 5. g9, q ga111 i 1 r ^ IN a hi " 1.999 R 9 'ppp� 3� �y g 6 �R 3 ^p '� �i f�ID R R �n 2 $ a 4`` , 9 A @ 2 9d .gig m �$ yiPfi "� a F i ggq �f � yy R! Ns! Y q E'J [[ 4 ' i+ $G ^1 it { j5( ^$$$Fg p 2 S A� R S Rd ' N 1 it 771 8889 99 ffl p 5'g� 7 5 py i r B �g @ Eek 8 9 E �@ g m gFaQ 9 R @ pi 8 �Y Y� 'a yJ t vi ygyg [ �p $ R Y2 O b f I @A 9 fi g@ 4 ^ k 77 � � '� hisg•g� `Q{A tt � r �nn 8r. va 9 '€ �i9 FFFF�gg�j 9 9 g, 3 0 b 4 jE g3 ¢�i. e. ..9 - $ II;11 qqpp s111 IN i 1 1���!!!tltl 777 g% 55€i pp� R2 Q3 €R 1. ' a ®� "RRR" k' T G1 & .F i'1 gi ajg€o 9 COMPLIANCE REQUIREMENTS FOR STORMWATER DISCHARGES FROM CONSTRUCTION SITES (TPDES GENERAL PERMIT T%R150000) Rpx tl 01 Y 9- 4E 1 A € if �s a i a :@ ' �A i IP' g` qi A Ri 3s ; �Jq is � i@83I� 5y �` F �� a np$s$ @ - "�A1 'J } yig @g�jE @i "'I� �E 3 a n_ i T3 S p® m $ yp i x GGG m S{ rg � � d R [ p� � Q i ii RY iy ¢ Y . . R Ili S € v� I�I "� g S p�p 1 i s O aO �' 9 � � 'A ii i 3 IN '2 3 3R sL'� ? ' 11 '� :�] qp a �i@ yyi ym G 1 g "N 0 R ig a R p ]G 2 0 !!1.333 4449R � R� S PPPP q ..ii o 6�g Sy" ill .a �a ^'9i R� a i3 '' F Q IVi p R @ :il € �R °✓ 1/1/1,4 { ( !� rYjB 0a 111;ltili!ig' I i^ $ 1 AO.gi 1 Iz÷ 4� a isdg IF, gig ;#3# 3 C3C3 9i11 11 R m II 995 8 DD g { @ g pa 2 ❑ %i Sim tl $k 1,1 8 Sp C iJ 555 s�� �P T g R N 7 33 i 11 pppy�€� R R'� a 1� ,g i r R9 4 R r tl F Y @ O 1 3 rte_ t = ` -- —'�/APIP7� � _ 44• F1'x J g i G 9 F 9a w• it - M a ;r • it x ER.M b INC ' CITY OF CORPUS CHRISTI, TEXAS INT EOOETE SWORE RE MOYAL Q.N. STEVENS WATER TREATMENT PUNTig CITY OF CORPUS CF}RISTI.w TEXAS UTtLiNES EZD DEPARTMENT �eparfinenf e/ Fnglrteering Sarvlces a�a�t women 1 6 au: : y I ..,f .,.:1 p n,€ glF `� 1 p GENERAL NOTES AND ESTIMATED QUANTITIES .a = s. 1 2 2 e. + I W e .0 aygo�pw n iC9 0 res CITY OF CORPUS CHRISTI, TEXAS C.N. STEVENS WATER TREATMENT PLANT INTERMEDIATE SLUDGE REMOVAL PHASE 1 OVERALL SITE PLAN CITY OF CORPUS CF}RISR TEXAS UTILIUES DEPARTMENT Jeparfinenf 0 EngfneeAng 5aM0a engineers 1 aunrewre mw:ow ? SI h Q 3 YE P,0 load a sirs +worms w iC9 ■ b 0 CITY OF CORPUS CHRISTI, TEXAS O.N. STEVENS WATER TREATMENT PLANT INTERMEDIATE SLUDGE REMOVAL PHASE 1 PROPOSED DREDGING PLANTriaNrWrir On CITY OF CORPUS CHRISR TEXAS VTI LI RES 7.05 DEPARTMENT • .,.lent 0 FnglneeMnp SaMces. Lief ern= engineers 1 aurvewre Addendum #2 Attachment #3 [16246 Intermediate Sludge Removal Phase 1 Q and A E16246 Intermediate Sludge Removal Phase 1 Q and A 11/18/2016 REVISION 3 Item Question/Comment Resolution4 Resolution Date Resolution Distributed 1 What hours will the contractor be allowed to work, 24/7? Weekends? Hours TBD (approx. 7-6 Mon. - Sun. for dredging and dewatering). Subject to noise ordinance 11/3/2016 Y 2 Is there a daily limit that can be delivered to landfill (ton or CY)? No limit. 11/3/2016 Y 3 Any days the landfill will not be open to accept residuals? Holidays, Weekends? Landfill will accept residuals 7 a.m. - 5 p.m. Mon. - Sat. but Sat. Hauling schedule is still TBD. 11/2/2016 Y 4 What's the coagulant and polymer currently used at ONS WFP? Alum coagulant and cationic polymer 11/2/2016 Y 5 Can the pond (Lagoon No. 7) be taken out of service? No, the pond must remain in service and the decant pump station protected from excessive solids. 11/2/2016 Y 6 Can the material be beneficially reused via land application? It's riot a desirable material but some area WTP's do land apply. Not allowed in this contract. 11/2/2016 Y 7 If land application is allowed, can the material be transported in liquid form (in lieu of dewatering)? Land application is not allowable in this contract due to lack of permitted recipients in the area. 11/2/2016 Y S When is the project considered complete? Amount of DT moved or residuals blanket elevation? Quantity of DT removed, as mutually agreed upon during contract award (dependent on unit price). 11/2/2016 Y 9 Does the dewatering polymer need to be NSF approved? Yes, all filtrate will be returned to treatment process. 11/2/2016 Y 10 Is the power at the site provided (paid for) by the customer? Preliminarily, elect. cost is subsidiary to DT bid item. Bid pkg. to ID power source and cost responsibility. 11/2/2016 Y 11 Can the dewatering filtrate be discharged back to the pond? Yes, using NSF approved polymer. 11/2/2016 Y 12 Are the stated milestones achievable? Yes 11/3/2016 Y 13 Is there a preferred route to Cefe Valenzuela? Hearn Rd. 11/3/2016 Y 14 What are the existing conditions in the pond? residuals depth, pond limits, flows? Exhibit provided at workshop and will be updated in bid package along with min and max WSE. 11/2/2016 Y 15 Is there a set residuals sampling date for contractors? Yes, see Item 30 below 11/11/106 Y ADDENDUM #2 ATTACHM ENT #3 PAGE 1 OF 7 11/18/2016 Item # Question/Comment Resolution Resolution Date Resolution Distributed 16 Is there a preferred residuals laydown area at Cefe? TBD 17 Who is responsible for removing cattails? Contractor. This will likely be a separate bid item. 11/3/2016 Y 18 Will there be opportunity for questions after the bid package is published? Yes, a deadline will be included in the advertisement. 11/3/2016 Y 19 Who will conduct paint filter tests @ each location (plant and landfill)? City staff will at the landfill and contractor will at the plant. 11/3/2016 Y 20 Will the official scale reading be at the landfill or plant? Landfill's scale will be used. 11/3/2016 Y 21 Will there be pre -approved testing labs listed? Yes, bid package will include pre -approved labs. 11/3/2016 Y 22 Will renewal option be mutual or sole discretion of the City? Can contractor decline the renewal offer? Contractors will have option to decline. 11/3/2016 Y 23 Does the lagoon have a liner that needs to be protected. Yes, clay liner. 11/3/2016 Y 24 What is min. and max. WSE in lagoon #7? TBD 25 Are there additional background checks required? No, only as required in contract documents. 11/18/2016 Y 26 Are prevailing wage rates applicable? Yes, TX31 and TX75 11/3/2016 Y 27 Will there be provisions to allow for contract time extensions (incl. milestones) for bad weather, etc. Yes, details will be included in bid package 11/3/2016 Y 28 Does schedule consider variation in percent solids with depth, particularly first milestone? Not directly, first milestone has additional 30 days for mobilization and optimization of operations. 11/3/2016 Y ADDENDUM #2 ATTACHMENT #3 PAGE 2 OF 7 11/18/2016 Item Question/Comment Resolution Resolution Date Resolution Distributed 29 Will the city allow for the residuals to be beneficially reused via land application? No, due to the compressed schedule of this project being a priority and risk of missing scheduled milestones due to prolonged land permitting efforts. Please see meeting minute Q and A document on CivCast for further explanation. 11/11/2016 Y 30 Since it is already November 11th and the plans are not out yet, and no sample date has been scheduled, I would like to request an extension of the bid date since that allows only 10 business days between now and November 30 to take samples, analyze samples and produce a bid. I would like to request a bid extension to Wednesday, December 7. Bid date will remain as 11/30/2016. The plans will be posted to CivCast no later than Monday, 11-14-16. Scheduled sample times are included in the in Addendum bid package and are as follows: Tuesday (11-15-16] & Wednesday (11-16-16); at 8:00 a.m. and 5:00 p.m. & Thursday (11-17-16) at 8:00 a.m. and 12:00 p.m. Contact the Engineer, Ian Clements, iclements@Invinc.com or at 361-548-9915 to coordinate your visit. 11/11/2016 Y 31 The pre project workshop was listed as mandatory, but the plans and specifications issued 11/14/16 state the the pre project workshop was non mandatory. Since the pre-bid workshop was advertised as mandatory, it should remain mandatory. Could you please clarify? Although the pre-bid workshop was advertised on CivCast as "mandatory", it has since been determined that the meeting did not meet the requirements necessary to qualify as a "mandatory" meeting. Specifically, the meeting was not published at least once a week for two consecutive weeks in a newspaper of general circulation with the first day of publication occurring at least 14 days before the date of the workshop. 11/17/2016 Y 32 It is noted that all questions are to be asked through CivCast. However, what is the deadline for questions prior to the closing BID date? The deadline to submit questions on Civcast will be Wednesday, November 23, 2016 at 5:00 p.m. 11/15/2016 Y ADDENDUM #2 ATTACHMENT #3 PAGE 3 OF 7 11/18/2016 Item # Question/Comment Resolution Resolution Date Resolution Distributed 33 With the deadline to submit questions being right before the Thanksgiving holiday, that doesn't allow much time for Bidders to evaluate the City's responses and how that might effect their bids. Given that timeframe, would the City consider an extension to the bid due date of at least a week? The Bid Date will remain as November 30, 2016. 11/17/2016 Y 34 There are a couple references in the bid specifications to on-line bid submissions as well as hard copy bid submissions. Will the City accept an electronic bid for this project through the CivCast website? If so, when will the on-line Bid button be enabled so that Bidders can upload their bids? Electronic submissions are acceptable. The Bidding feature will be activated the Monday prior to the Bid Opening. (In this case the bid opening is November 30th so Online Bidding will be available November 28th) 11/17/2016 Y 35 Will the contractor be able to draw water out of the pre settlement basin at no charge? Water may be taken out of the pre -sedimentation basin at no charge, however NO damage may be done to the existing berms. 11/17/2016 Y 36 What is the price of electric per kwh? This will be addressed in an addendum. 11/17/2016 Y 37 Where is the dB(A) level measured in regards to the noise ordinance in the specifications? Per the City's Ordinance, the dB(A) levels set forth in the ordinance apply to the property where the sound is being received. 11/17/2016 Y 38 Would a privacy fence screen be allowed to prevent from disturbing the privacy of the residents across Hearn Rd.? A privacy fence screen is not required as part of this project, and no payment for such will be authorized as part of this contract. If the Contractor chooses to install a privacy fence screen all costs associated with the screen shall be borne by the Contractor including, but not limited to installation, removal, and any permits required. 11/17/2016 Y 39 Are there any restrictions on starting to dredge in the thicker areas of sludge near the cattails? There are no restrictions on where the dredging operations start, as long as the dredging operations do not impede flow into the lagoon. 11/17/2016 Y ADDENDUM #2 ATTACHMENT #3 PAGE 4 OF 7 11/18/2016 Item Question/Comment Resolution Resolution Date Resolution Distributed 40 Article 7 of the General Conditions indicates at Paragraph 7.02(c) that Work is not to be performed on Saturday & without OAR17s consent. Question: To be as efficient as possible and submit a lower bid to the City we would like to work on most Saturdays. When preparing our bid price can the Contractor assume that they will be allowed to consistently haul for at least one- half of a day on Saturday (as long as the landfill is open) with the other half used for routine maintenance? The City has agreed to allow the Contractor to work at the plant site on Saturdays. If the Contractor wants to perform hauling operations he/she is responsible for all coordination with the Landfill and testing labs 11/17/2016 Y ADDENDUM #2 ATTACHMENT #3 PAGE 5 OF 7 11/18/2016 Item Question/Comment Resolution Resolution Date Resolution Distributed 41 section ui ii uu, raragrapn i.uz, states, in part, the contractor will NOT be responsible for tipping fees at the Cefe Valenzuela Landfill Later in Section 46 76 11, Paragraph 3.06(D) states, No tipping fee will be imposed on any Hauler in association with the work of this contract. Hauler and Vehicle registration fees specified in Attachment B are applicable and required. It appears from Attachment B that the vehicle registration fee is $1.00/year/vehicle and the Hauler registration (permit) fee is $100.00/year/entity. However, clarification is needed as to the Table, incorporated as Exhibit B to Attachment 6, entitled Fees for Payment of MSWSSC for Permitted Haulers, for waste collected in the city and its column labeled, Base Tip Fee.ilt appears there are 3 different types of fees in question. 1. Tipping Fees E our interpretation is that there is no charge to the contractor or the hauler for this fee. 2. Registration Fees 0 It is our interpretation that this fee is $1.00/year/vehicle. 3. Hauler Fee E It is our interpretation that this fee is $ 100/year/entity. The basis of this question relates to the table listed in Exhibit B which has a variety of fees listed that will greatly affect the bid price. If these fees do not apply we are confused as to why they are in the specifications. If they do apply then we need clarification on exactly what fees on this exhibit apply. Question: Have we interpreted the fees correctly that The interpretation of the fees is correct. Tipping fee will not be required. The tipping fee table will be crossed out/stricken from the specification. The $100 permitted solid waste hauler and $1.00 annual and $5.00 initial or lost permit per vehicle or container fees will be required. 11/17/2016 y 42 Can additional dates be set for samples to be taken (11/21-11/23)? 43 Does the City have a list of certified MBE firms that could be used for this project? ADDENDUM #2 ATTACHMENT #3 PAGE 6 OF 7 11/18/2016 Item Question/Comment Resolution4 Resolution Date Resolution ❑istributed 44 In the Addendum 41 there was no listing of approved certified labs for testing the solids daily. Can that be provided. 45 46 47 ADDENDUM #2 ATTACHMENT #3 PAGE 7 OF 7 CO 9101 ADDENDUM NUMBER 1 Project: D.N. Stevens Water Treatment Plant intermediate Sludge Removal • hose 1 Project Number: E16246 Owner: City of Corpus Christi city ........410111" Engineer. J.H. Edmonds, P.E. _'!r' r Designer. LNV, Inc. Addendum No. 1 Specification Section: 00 9101 Issue Date: 11/11/2016 Acknowledge receipt of this Addendum in the Bid Acknowledgement Form submitted for this Project. Failure to acknowledge receipt of this addendum in the Bid Acknowledgement Form may render the Bid as non-responsive and serve as the basis for rejecting the Bid. Make the additions, modifications or deletions to the Contract Documents described in this Addendum. Approved by: LNV, Inc. Marcus J. Naiser, P.E. 11/11/2016 ..'"• i0 ►� i'�- `�-• �i1}f . i� /•••• ••--••-•••••«-•••«•• ••• r MARCUS J. NAISER p f••K••••q•►-M••-••••NH.# ,92814 Name Date Addendum Items:f*� Addition of Contract Documents, Plans, and Specifications LNV, Inc. TBPE Frim Na. F-366 Addendum No. 1 00 9101-1 O.N. Stevens Water Treatnment Plant Intermediate Sludge Removal Phase 1 {Protect No. E16246) Rev 01-13-2016 ARTICLE 1— BIDDING REQUIREMENTS 1.01 ACKNOWLEDGE ADDENDA A. Acknowledge receipt of this Addendum in the Bid Acknowledgement Form submitted for this Project. Failure to acknowledge receipt of this addendum in the Bid Acknowledgement Form may render the Bid as non-responsive and serve as the basis for rejecting the Bid. ARTICLE 2 — MODIFICATIONS TO THE SPECIFICATIONS OR TECHNICAL SPECIFICATIONS. 2.01 ADD, DELETE OR REPLACE SPECIFICATION SECTIONS (OR TECHNICAL SPECIFICATIONS) A. Add the following Specification Sections or Technical Specifications (all included as Attachment 1): Addendum No. 1 00 9101 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 Division / Section Title Division 00 Procurement and Contracting Requirements 00 21 13 Invitation to Bid and Instructions to Bidders (Rev01-13-2016) 00 30 00 Bid Acknowledgment Form (Rev01-13-2016) 00 30 01 Bid Form (Rev01-13-2016) 00 30 02 Compliance to State Law on Nonresident Bidders 00 30 05 Disclosure of Interest (Rev 01-13-2016) 00 30 06 Non -Collusion Certification 00 45 16 Statement of Experience (Rev 06-22-2016) 00 52 23 Agreement (Rev06-22-2016) 00 61 13 Performance Bond (Rev 01-13-2016) 00 61 16 Payment Bond (Rev01-13-2016) 00 72 00 General Conditions (Rev 3-23-2015) 00 72 01 Insurance Requirements (Rev06-22-2016) 00 72 02 Wage Rate Requirements (Rev06-12-2015) 00 72 03 Minority / MBE / DBE Participation Policy (Rev01-13-2016) 00 73 00 Supplementary Conditions Division 01 General Requirements 01 1100 Summary of Work (Rev 0l -13-2o16) 01 23 10 Alternates and Allowances 01 29 00 Application for Payment Procedures (Rev 03-11-2015) 01 29 01 Measurement and Basis for Payment (Rev01-13-2016) 01 31 00 Project Management and Coordination (Rev01-13-2016) Addendum No. 1 00 9101 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 Division / Section Title 0131 13 Project Coordination 0131 14 Change Management 0133 00 Document Management 0133 01 Submittal Register (Rev 7/3/2014) 0133 02 Shop Drawings 01 33 03 Record Data 0133 04 Construction Progress Schedule 0133 05 Video and Photographic Documentation 0135 00 Special Procedures 0140 00 Quality Management 0150 00 Temporary Facilities and Controls 0157 00 Temporary Controls 0170 00 Execution and Closeout Requirements Part T Technical Specifications 46 75 11 Dredging, Dewatering and Hauling ARTICLE 3 — MODIFICATIONS TO THE DRAWINGS 3.01 ADD OR DELETE DRAWINGS A. ADD the following Drawings: Sheet No. Drawing Title 1 COVER SHEET 2 TYPICAL LEGEND AND TESTING SCHEDULE 3 GENERAL NOTES AND ESTIMATED QUATITIES 4 OVERALL SITE PLAN 5 PROPOSED DREDGING PLAN 6 OVERALL ONE -LINE DIAGRAM FOR EXISTING SLUDGE HANDLING MCC 7 EXISTING SLUDGE HANDLING MCC ONE -LINE DIAGRAM Addendum No. 1 00 9101 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 ARTICLE 4 — CLARIFICATIONS 4.01 QUESTIONS A. Please see Attachment 2 "E16246 Intermediate Sludge Removal Phase 1 Mandatory Pre -Bid Workshop Q and A" REVISION 2 dated 11/11/2016 The Q and A document is also available for download from the web address below. http://www.civcastusa.coraprolectdoclist.aspx?proiectld=9604. 4.02 CLARIFICATIONS A. Any Bidder interested in doing so may obtain residual samples or other site specific data during the dates and times listed below. Bidders must coordinate all site visits with the Engineer. The Engineer will provide personnel to escort Contractors into the site and facilitate data gathering. Please contact the Engineer at the contact information below to coordinate your site visit a minimum of 30 minutes in advance. Ian Clements Cell Phone: (361) 548 9915 Email Address: iclements@Invinc.com Business Phone: (361) 8831984 1. Tuesday November 15, 2016 8:00 a.m. and 5:00 p.m. 2. Wednesday November 16, 2016 8:00 a.m. and 5:00 p.m. 3. Thursday November 17 2016 8:00 a.m. and 12:00 p.m. B. Bidding will be open to all prospective bidders, regardless of whether or not the Bidder had a representative in attendance at the Pre -Bid Workshop held on Wednesday November 2, 2016. Due to the unconventional advertisement process for this project, regulations prohibit the November 2, 2016 Pre -Bid Workshop from being mandatory for prospective bidders. END OF ADDENDUM NO. 1 Addendum No. 1 00 9101 - 4 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 Attachment 1 Specification Sections and Technical Specifications CONTRACT DOCUMENTS FOR CONSTRUCTION OF O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 E16246 Addendum Number 1 City of Corpus Christi LNV, Inc. luI loom %w.rir* MARCUS J. NAISER f� Ii 92814' t1a r EICEtisr- f MAZON PE. ,l--rt-/6 801 Navigation, Suite 300 / Corpus Christi, TX / 361-883-1984 November 11, 2016 Record Drawing Number WTR 460 00 01 00 TABLE OF CONTENTS Division / Section Title Division 00 Procurement and Contracting Requirements 00 21 13 Invitation to Bid and Instructions to Bidders (Rev01-13-2016) 00 30 00 Bid Acknowledgment Form (Rev01-13-2016) 00 30 01 Bid Form (Rev01-13-2016) 00 30 02 Compliance to State Law on Nonresident Bidders 00 30 05 Disclosure of Interest (Rev01-13-2016) 00 30 06 Non -Collusion Certification 00 45 16 Statement of Experience (Rev06-22-2016) 00 52 23 Agreement (Rev06-22-2016) 00 51 13 Performance Bond (Rev01-13-2016) 00 51 16 Payment Bond (Rev 01-13-2016) 00 72 00 General Conditions (Rev 3-23-2015) 00 72 01 Insurance Requirements (Rev06-22-2016) 00 72 02 Wage Rate Requirements (Rev06-12-2015) 00 72 03 Minority / MBE / DBE Participation Policy (Rev01-13-2016) 00 73 00 Supplementary Conditions Division 01 General Requirements 01 1100 Summary of Work (Rev01-13-2016) 01 23 10 Alternates and Allowances 01 29 00 Application for Payment Procedures (Rev 03-11-2015) 01 29 01 Measurement and Basis for Payment (Rev01-13-2016) 01 31 00 Project Management and Coordination (Rev01-13-2016) 0131 13 Project Coordination 0131 14 Change Management 0133 00 Document Management 0133 01 Submittal Register (Rev 7/3/2014) 0133 02 Shop Drawings 0133 03 Record Data 0133 04 Construction Progress Schedule 0133 05 Video and Photographic Documentation 0135 00 Special Procedures Table of Contents O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 000100-1 Rev 06-22-2016 Division / Section Title 0140 00 Quality Management 0150 00 Temporary Facilities and Controls 0157 00 Temporary Controls 0170 00 Execution and Closeout Requirements Part T Technical Specifications 46 76 11 Dredging, Dewatering and Hauling END OF SECTION Table of Contents O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 000100-2 Rev 06-22-2016 00 21 13 INVITATION TO BID AND INSTRUCTIONS TO BIDDERS ARTICLE 1—DEFINED TERMS 1.01 Terms used in this Invitation to Bid and Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. ARTICLE 2 — GENERAL NOTICE 2.01 The City of Corpus Christi, Texas (Owner) is requesting Bids for the construction of the following Project: O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 Project No. E16246 A. The project generally consists of dredging, dewatering (as necessary), hauling and delivering to disposal site, water treatment plant residuals (sludge) from an existing storage lagoon. The residuals will be dredged from Lagoon No. 7 (Washwater Return Basin) located on-site at O.N. Stevens Water Treatment Plant, 13101 Leopard Street, Corpus Christi, Texas (ONSWTP). The initial contract will be for a one (1) year (12 - calendar months) and approximately $4M base contract with one (1) optional one (1) year (12 -calendar months) renewal for an additional $4M based on Contractor's successful performance, approval by the City/Engineer and concurrence from the Contractor. 2.02 The Engineer's Opinion of Probable Construction Cost for the Project is $4.000.000 for the base contract and an additional $4,000,000 for the optional renewal. The Project (base contract) is to be substantially complete within 365 days. The optional renewal contract will be for an additional 365 days for substantial completion. The Project(s) (base contract and renewal) are to be complete and eligible for Final Payment 30 days after their respective dates for Substantial Completion. 2.03 Advertisement and bidding information for the Project can be found at the following website: www.CivCastUSA.com 2.04 Contract Documents may be downloaded or viewed free of charge at this website. This website will be updated periodically with Addenda, lists of interested parties, reports, or other information relevant to submitting a Bid for the Project. ARTICLE 3 — DELIVERY AND OPENING OF BIDS 3.01 Bids must be received no later than Tuesday, November 30, 2016 at 2:00 P.M. to be accepted. Bids received after this time will not be accepted. It is the sole responsibility of the Bidder to deliver the Bid, electronic or hard copy, by the specified deadline. Invitation to Bid and Instructions to Bidders O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 002113-1 Rev 01-13-2016 3.02 Complete and submit the Bid Form, the Bid Bond and the Bid Acknowledgement Form along with all required documents identified in the Bid Acknowledgement Form. 3.03 Electronic Bids may be submitted to the CivCast website at www.civcastusa.com. 3.04 If submitting a hard copy bid or bid security by cashier's check or money order, please address envelopes or packages: City of Corpus Christi City Secretary's Office City Hall Building, 1st Floor 1201 Leopard Street Corpus Christi, Texas 78401 Attention: City Secretary Bid - O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 Project No. E16246 All envelopes and packages (including FEDEX envelopes) must clearly identify, on the OUTSIDE of the package, the project name and number and that bid documents are enclosed. 3.05 Bids will be publicly opened and read aloud at Tuesday, November 30, 2016 at 2:00 P.M, at the following location: City Hall Building— City of Corpus Christi First Floor City Council Staff Room or Council Chambers 1201 Leopard Street Corpus Christi, Texas 78401 3.06 The Owner will read aloud the names of the Bidders and the apparent Bid amounts shown on the Bid Summary for all Bids received in time to be considered. ARTICLE 4 —PRE-BID CONFERENCE 4.01 A non -mandatory pre-bid conference for the Project was held on Wednesday November 2, 2016 at 10:00 A.M. at the following location: O.N. Stevens Water Treatment Plant Filter Building Second Floor 13101 Leopard Street Corpus Christi, Texas 78401 Invitation to Bid and Instructions to Bidders O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 002113-2 Rev 01-13-2016 ARTICLE 5 — COPIES OF CONTRACT DOCUMENTS 5.01 Obtain a complete set of the Contract Documents as indicated in SECTION 00 52 23 AGREEMENT. 5.02 Use complete sets of Contract Documents in preparing Bids; Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete sets of Contract Documents. 5.03 OPT makes copies of Contract Documents available for the sole purpose of obtaining Bids for completion of the Project and does not confer a license or grant permission or authorization for any other use. ARTICLE 6—EXAMINATION OF CONTRACT DOCUMENTS 6.01 Before submitting a Bid: A. Examine and carefully study the Contract Documents, including any Addenda and related supplemental data. B. Become familiar with all federal, state, and local Laws and Regulations that may affect cost, progress, or the completion of Work. C. Carefully study and correlate the information available to the Bidder with the Contract Documents, Addenda, and the related supplemental data. D. Notify the OAR of all conflicts, errors, ambiguities, or discrepancies that the Bidder discovers in the Contract Documents, Addenda, and the related supplemental data. E. Determine that the Contract Documents, Addenda, and the related supplemental data are generally sufficient to indicate and convey understanding of all terms and conditions for completion of Work. 6.02 The submission of a Bid will constitute an incontrovertible representation by the Bidder that the Bidder has complied with every requirement of this Article 5, that without exception the Bid is premised upon completion of Work required by the Contract Documents, Addenda, and the related supplemental data, that the Bidder has given the OAR written notice of all conflicts, errors, ambiguities, and discrepancies that the Bidder has discovered in the Contract Documents, Addenda, and the related supplemental data and the written resolutions provided by the OAR are acceptable to the Bidder, and that the Contract Documents, Addenda, and the related supplemental data are generally sufficient to indicate and convey understanding of all terms and conditions for completion of Work. ARTICLE 7 — INTERPRETATIONS AND ALTERNATE BIDS 7.01 Submit all questions about the meaning or intent of the Contract Documents, Addenda, and the related supplemental data using the Owner's Bidding Website at www.civcastusa.com. Responses to questions submitted will be posted on the website by the Owner for the benefit of all Bidders. Responses will be posted for questions submitted by 5:00 p.m. seven (7) days prior to the date of the bid opening. Inquiries made after this period may not be addressed. Invitation to Bid and Instructions to Bidders O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 002113-3 Rev 01-13-2016 7.02 Submit any offer of alternate terms and conditions, or offer of Work not in strict compliance with the Contract Documents to the OAR no later than 14 days prior to the date for opening of Bids. OAR and Designer will issue Addenda as appropriate if any of the proposed changes to the Contract Documents are accepted. A Bid submitted with clarifications or taking exceptions to the Contract Documents, except as modified by Addenda, may be considered non-responsive. 7.03 Addenda may be issued to clarify, correct, or change the Contract Documents, Addenda or the related supplemental data as deemed advisable by the Owner or Designer. Modifications to the Contract Documents prior to the award of contract can only be made by Addenda. Only answers in Addenda authorized by the Owner will be binding. Oral and other interpretations or clarifications will be without legal effect. ARTICLE 8 — BID SECURITY 8.01 Bidders must submit an acceptable Bid Security with their Bid as a guarantee that the Bidder will enter into a contract for the Project with the Owner within 10 days of Notice of Award of the Contract. The security must be payable to the City of Corpus Christi, Texas in the amount of 5 percent (5%) of the greatest amount bid. 8.02 Bid Security may be in the form of a Bid Bond or a cashier's check, certified check, money order, or bank draft from a chartered financial institution authorized to operate in the State of Texas. Bidders submitting bids electronically through the CivCast System at www.CivCastUSA.com shall scan and upload a copy of Bid Bond as an attachment to their bid. Cashier's check, certified check, money order or bank draft must be enclosed in a sealed envelope, plainly identified on the outside as containing bid documents, the bidder's name and the job name and number and delivered as required in Article 7 below. 8.03 Bid Bond Requirements: 1. A Bid Bond must guarantee, without qualification or condition, that the Owner will be paid a sum equal to 5 percent (5%) of the greatest amount bid if, within 10 calendar days of Notice of Award of the Contract, the Bidder/Principal: a. fails to enter into a contract for the Project with the Owner, or b. fails to provide the required Performance and Payment Bonds. 2. A Bid Bond may not limit the sum payable to the Owner to be the difference between the Bidder/Principal's bid and the next highest bidder. 3. The Bid Bond must reference the Project by name as identified in Article 1. 4. Bidders may provide their surety's standard bid bond form if revised to meet these Bid Bond Requirements. 8.04 Failure to provide an acceptable Bid Security will constitute a non-responsive Bid which will not be considered. 8.05 Failure to provide the required Performance and Payment Bonds will result in forfeiture of the Bid Security to the City as liquidated damages. 8.06 Owner may annul the Notice of Award and the Bid Security of the Bidder will be forfeited if the apparent Selected Bidder fails to execute and deliver the Agreement or Amendments to the Invitation to Bid and Instructions to Bidders O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 002113-4 Rev 01-13-2016 Agreement. The Bid Security of other Bidders whom the Owner believes to have a reasonable chance of receiving the award may be retained by the Owner until the earlier of 7 days after the Effective Date of the Contract or 90 days after the date Bids are opened. 8.07 Bid Securities are to remain in effect until the Contract is executed. The Bid Securities of all but the three lowest responsible Bidders will be returned within 14 days of the opening of Bids. Bid Securities become void and will be released by the Owner when the Contract is awarded or all Bids are rejected. ARTICLE 9 — PREPARATION OF BID 9.01 The Bid Form is included with the Contract Documents and has been made available at the Owner's Bidding Website. Complete all blanks on the Bid Form by typing or printing in ink. Indicate Bid prices for each Bid item or alternate shown. 9.02 Execute the Bid Acknowledgement Form as indicated in the document and include evidence of authority to sign. 9.03 Acknowledge receipt of all Addenda by filling in the number and date of each Addendum. Provide a signature as indicated to verify that the Addenda were received. A Bid that does not acknowledge the receipt of all Addenda may be considered non-responsive. 9.04 Provide the name, address, email, and telephone number of the individual to be contacted for any communications regarding the Bid in the Bid Acknowledgement Form. 9.05 Provide evidence of the Bidder's authority and qualification to do business in the State of Texas or covenant to obtain such qualification prior to award of the Contract. ARTICLE 10—CONFIDENTIALITY OF BID INFORMATION 10.01 In accordance with Texas Government Code 552.110, trade secrets and confidential information in Bids are not open for public inspection. Bids will be opened in a manner that avoids disclosure of confidential information to competing Bidders and keeps the Bids from the public during considerations. All Bids are open for public inspection after the Contract is awarded, but trade secrets and confidential information in Bids are not typically open for public inspection. The Owner will protect this information to the extent allowed by Laws and Regulations. Clearly indicate which specific documents are considered to be trade secrets or confidential information by stamping or watermarking all such documents with the word "confidential" prominently on each page or sheet or on the cover of bound documents. Place "confidential" stamps or watermarks so that they do not obscure any of the required information on the document, either in the original or in a way that would obscure any of the required information in a photocopy of the document. Photocopies of "confidential" documents will be made only for the convenience of the selection committee and will be destroyed after the Effective Date of the Contract. Original confidential documents will be returned to the Bidder after the Effective Date of the Contract if the Bidder indicates that the information is to be returned with the Bid, and arrangements for its return are provided by the Bidder. Invitation to Bid and Instructions to Bidders O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 002113-5 Rev 01-13-2016 ARTICLE 11— MODIFICATION OR WITHDRAWAL OF BID 11.01 A Bid may be withdrawn by a Bidder, provided an authorized individual of the Bidder submits a written request to withdraw the Bid prior to the time set for opening the Bids. 11.02 A Bidder may withdraw its Bid within 24 hours after Bids are opened if the Bidder files a signed written notice with the Owner and promptly, but no later than 3 days, thereafter demonstrates to the reasonable satisfaction of the Owner that there was a material and substantial mistake in the preparation of its Bid. The Bid Security will be returned if it is clearly demonstrated to the Owner that there was a material and substantial mistake in its Bid. A Bidder that requests to withdraw its Bid under these conditions may be disqualified from responding to a reissued invitation to Bid for the Work to be furnished under these Contract Documents. ARTICLE 12 — BIDS REMAIN SUBJECT TO ACCEPTANCE 12.01 All Bids will remain subject to acceptance for 90 days, but the Owner may, at its sole discretion, release any Bid and return the Bid Security prior to the end of this period. ARTICLE 13 — STATEMENT OF EXPERIENCE 13.01 Bidders must submit the information required in SECTION 00 4516 STATEMENT OF EXPERIENCE with the Bids to demonstrate that the Bidder meets the minimum requirements to complete the Work. Failure of Bidder to demonstrate, through submission of the Statement of Experience, the experience required as specified in Section 00 45 16 STATEMENT OF EXPERIENCE will be cause to reiect a Bid. 13.02 ARTICLE 14 — EVALUATION OF BIDS 14.01 The Owner will consider the amount bid, the Bidder's responsibilities, the Bidder's safety record, the Bidder's indebtedness to Owner, the Bidder's capacity to perform the work and/or whether the Bidder has met the minimum specific project experience requirements. 14.02 Owner may conduct such investigations as it deems necessary to establish the responsibility of the Bidder and any Subcontractors, individuals, or entities proposed to furnish parts of the Work in accordance with the Contract Documents. 14.03 Submission of a Bid indicates the Bidder's acceptance of the evaluation technique and methodology as well as the Bidder's recognition that some subjective judgments must be made by the Owner during the evaluation. Each Bidder agrees to waive any claim it has or may have against the OPT and their respective employees, arising out of or in connection with the administration, evaluation, or recommendation of any Bid. ARTICLE 15 — AWARD OF CONTRACT 15.01 The Bidder selected for award of the Contract will be the lowest responsible Bidder that submits a responsive bid. Owner reserves the right to reject any and all Bids, including without limitation, non -conforming, non-responsive or conditional Bids. The Owner reserves the right to Invitation to Bid and Instructions to Bidders O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 002113-6 Rev 01-13-2016 adopt the most advantageous interpretation of the Bids submitted in the case of ambiguity or lack of clearness in stating Bid prices and/or waive any or all formalities. 15.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work shall be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest. ARTICLE 16 — MINORITY / MBE / DBE PARTICIPATION POLICY 16.01 Selected Contractor is required to comply with the Owner's Minority / MBE / DBE Participation Policy as indicated in SECTION 00 72 03 MINORITY / MBE / DBE PARTICIPATION POLICY. 16.02 Minority participation goal for this Project has been established to be 45%. 16.03 Minority Business Enterprise participation goal for this Project has been established to be 15%. 16.01 Disadvantaged Business Enterprise participation goal for this Project has been established to be sYe. ARTICLE 17 — BONDS AND INSURANCE 17.01 Article 6 of the General Conditions and SECTION 00 72 01 INSURANCE REQUIREMENTS sets forth the Owner's requirements as to Bonds and insurance. When the Selected Bidder delivers the executed Agreement to the Owner, it must be accompanied by the required Bonds and evidence of insurance. 17.02 Provide Performance and Payment Bonds for this Project that fully comply with the provisions of Texas Government Code Chapter 2253. Administration of Bonds will conform to Texas Government. Code Chapter 2253 and the provisions of these Contract Documents. ARTICLE 18 — SIGNING OF AGREEMENT 18.01 The City Engineer or Director of Capital Programs will submit recommendation for award to the City Council for those project awards requiring City Council action. The Selected Bidder will be required to deliver the required Bonds and insurance certificates and endorsements along with the required number of counterparts (1) of the Agreement and attached documents to the Owner within 14 days. The Contract will be signed by the City Manager or his/her designee after award and the Bidder's submission of required documentation and signed counterparts. The Contract will not be binding upon Owner until it has been executed by both parties. Owner will process the Contract expeditiously. However, Owner will not be liable for any delays prior to the award or execution of Contract. ARTICLE 19 — SALES AND USE TAXES 19.01 The Owner generally qualifies as a tax exempt agency as defined by the statutes of the State of Texas and is usually not subject to any City or State sales or use taxes, however certain items such as rented equipment may be taxable even though Owner is a tax-exempt agency. Assume responsibility for including any applicable sales taxes in the Contract Price and assume Invitation to Bid and Instructions to Bidders O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 002113-7 Rev 01-13-2016 responsibility for complying with all applicable statutes and rulings of the State of Texas Comptroller. 19.02 It is the Owner's intent to have this Contract qualify as a "separated contract." ARTICLE 20 — WAGE RATES 20.01 This Contract is subject to Texas Government Code Chapter 2258 concerning payment of prevailing wage rates. Requirements for paying the prevailing wage rates are discussed in SECTION 00 72 02 WAGE RATE REQUIREMENTS. Bidders must pay not less than the minimum wage shown on this list and comply with all statutes and rulings of the State of Texas Comptroller. ARTICLE 21— BIDDER'S CERTIFICATION OF NO LOBBYING 21.01 In submitting its Bid, Bidder certifies that it has not lobbied the City or its officials, managers, employees, consultants, or contractors in such a manner as to influence or to attempt to influence the bidding process. In the event it reasonably appears that the Bidder influenced or attempted to influence the bidding process, the City may, in its discretion, reject the Bid. ARTICLE 22 —CONFLICT OF INTEREST 22.01 Bidder agrees to comply with Chapter 176 of the Texas Local Government Code and file Form CIQ with the City of Corpus Christi City Secretary's Office, if required. For more information on Form CIQ and to determine if you need to file a Form CIQ, please review the information on the City Secretary's website at http://www.cctexas.comigovernment/city-secretary/conflict- disclosure/index. ARTICLE 23 —CERTIFICATE OF INTERESTED PARTIES 23.01 Bidder agrees to comply with Texas Government Code section 2252.908 and complete Form 1295 Certificate of Interested Parties as part of this contract, if required. For more information, please review the information on the Texas Ethics Commission website at htt ps: ]1www. et h i cs. sta to . tx. u s . ARTICLE 24 - REJECTION OF BID 24.01 The following will be cause to reject a Bid: A. Bids which are not signed by an individual empowered to bind the Bidder. B. Bids which do not have an acceptable Bid Security, with Power of Attorney, submitted as required by Article 7. C. More than one Bid for same Work from an individual, firm, partnership or corporation. D. Evidence of collusion among Bidders. E. Sworn testimony or discovery in pending litigation with Owner which discloses misconduct or willful refusal by bidder to comply with subject contract or instructions of Owner. Confcrcncc, if applicablc. Invitation to Bid and Instructions to Bidders O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 002113-8 Rev 01-13-2016 G. Bids received from a Bidder who has been debarred or suspended by Owner. H. Bids received from a Bidder when Bidder or principals are currently debarred or suspended by Federal, State or City governmental agencies. I. Failure of Bidder to demonstrate, through submission of the Statement of Experience, the experience required as specified in Section 00 45 16 STATEMENT OF EXPERIENCE. J. Failure to submit Bid information specified in Section 00 45 16 STATEMENT OF EXPERIENCE with the bid. 24.02 The following may be cause to reject a Bid or cause to deem a Bid non-responsive or irregular. The City reserves the right to waive any irregularities and any or all formalities: A. Poor performance in execution of work under a previous City of Corpus Christi contract. B. Failure to achieve reasonable progress on an existing City of Corpus Christi contract. Evidence of Bidder's recurring failure to complete an item of work within a timeframe acceptable to the City or in accordance with a City -accepted schedule is evidence of Bidder's failure to achieve reasonable progress under this subsection. C. Default on previous contracts or failure to execute Contract after award. D. Evidence of failure to pay Subcontractors, Suppliers or employees in accordance with Contract requirements. E. Bids containing omissions, alterations of form, additions, qualifications or conditions not called for by Owner, or incomplete Bids may be rejected. In any case of ambiguity or lack of clarity in the Bid, OWNER reserves right to determine most advantageous Bid or to reject the Bid. F. Failure to acknowledge receipt of Addenda. G. Failure to submit post Bid information specified in Section 00115 16 STATEMENT OF EXPERIENCE within the allotted time(s). H. Failure to timely execute Contract after award. 1. Previous environmental violations resulting in fines or citations by a governmental entity (i.e. U.S. Environmental Protection Agency, Texas Commission on Environmental Quality, etc.). J. Bidder's Safety Experience. K. Failure of Bidder to demonstrate, through submission of thc Statement of Experience, thc experience required as specified in Section 00 45 16 STATEMENT OF EXPERIENCE, if that Section is included in the bidding documents. L. Evidence of Bidder's lack of sufficient resources, workforce, equipment or supervision, if required by inclusion of appropriate requirements in Section 00 45 16 STATEMENT OF EXPERIENCE. M. Evidence of poor performance on previous Projects as documented in Owner's project performance evaluations. N. Unbalanced Unit Price Bid: "Unbalanced Bid" means a Bid, which includes a Bid that is based on unit prices which are significantly less than cost for some Bid items and significantly more than cost for others. This may be evidenced by submission of unit price Invitation to Bid and Instructions to Bidders O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 002113-9 Rev 01-13-2016 Bid items where the cost are significantly higher/lower than the cost of the same Bid items submitted by other Bidders on the project. O. Evidence of Bidder's lack of capacity to perform the Work. Evidence of Bidder's lack of capacity. Evidence of capacity to perform the Work will include a factual review of (i) all remaining work or incomplete work items under any existing city or non -city contract; (ii) ability to perform the Work with remaining sufficient resources, workforce, equipment and supervision/supervisory staff; (iii) ability in the past to timely complete the same or similar work in a good and workmanlike manner utilizing same or similar remaining resources or under the same or similar conditions. Evidence of incomplete work items under any existing City -awarded IDIQ or other contract for similar work may constitute a lack of capacity to perform the Work. END OF SECTION Invitation to Bid and Instructions to Bidders 00 21 13 -10 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 00 30 00 BID ACKNOWLEDGEMENT FORM ARTICLE 1— BID RECIPIENT In accordance with the Drawings, Specifications, and Contract Documents, this Bid Proposal is submitted by (type or print name of company) on: Tuesday, November 30, 2016 at 2:00 P.M for Q.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1(Project No. E16246). 1.01 Submit Bids, Bid Security and all attachments to the Bid (See Section 7.01 below) to the City's electronic bidding website at www.CivCastUSA.com. If submitting hard copy bids or bid security in the form of a cashier's or certified check, please send to: The City of Corpus Christi, Texas City Secretary's Office 1201 Leopard Street Corpus Christi, Texas 78401 Attention: City Secretary Bid - O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 Project No. E16246 All envelopes and packages (including FEDEX envelopes) must clearly identify, on the OUTSIDE of the package, the project name and number and that bid documents are enclosed. ARTICLE 2 — BIDDERS'S ACKNOWLEDGMENTS 2.01 Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner on the form included in the Contract Documents, to perform all Work specified or indicated in Contract Documents for the Contract. Price indicated in this Bid or as modified by Contract Amendment. Bidder agrees to complete the Work within the Contract Times established in the Agreement or as modified by Contract Amendment and comply with the all other terms and conditions of the Contract Documents. 2.02 Bidder accepts all of the terms and conditions of SECTION 00 21 13 INVITATION AND INSTRUCTIONS TO BIDDERS, including those dealing with required Bonds. The Bid will remain subject to acceptance for 90 days after the opening of Bids. 2.03 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of its failure to complete Work in accordance with the schedule set forth in the Agreement. 2.04 Bidder acknowledges receipt of the following Addenda: Addendum No. Addendum Date Signature Acknowledging Receipt Bid Acknowledgement Form O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 003000-1 Rev 01-13-2016 Addendum No. Addendum Date ARTICLE 3 — BIDDER'S REPRESENTATIONS Signature Acknowledging Receipt 3.01 The Bidder has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. 3.02 The Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. 3.03 The Bidder is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work. 3.04 The Bidder has carefully studied the following Site -related reports and drawings as identified in the Supplementary Conditions: A. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; B. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; C. Underground Facilities referenced in reports and drawings; D. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and E. Technical Data related to each of these reports and drawings. 3.05 The Bidder has considered the: A. Information known to Bidder; B. Information commonly known to contractors doing business in the locality of the Site; C. Information and observations obtained from visits to the Site; and D. The Contract Documents. 3.06 The Bidder has considered the items identified in Paragraphs 3.04 and 3.05 with respect to the effect of such information, observations, and documents on: A. The cost, progress, and performance of the Work; B. The means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and C. Bidder's safety precautions and programs. 3.07 Based on the information and observations referred to in the preceding paragraphs, Bidder agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. Bid Acknowledgement Form O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 003000-2 Rev 01-13-2016 3.08 The Bidder is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. 3.09 The Bidder has correlated the information known to the Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. 3.10 The Bidder has given the OAR written notice of all conflicts, errors, ambiguities, or discrepancies that the Bidder has discovered in the Contract Documents, and the written resolution provided by the OAR is acceptable to the Bidder. 3.11 The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 3.12 Bidder's entry into this Contract constitutes an incontrovertible representation by Bidder that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. ARTICLE 4 — BASIS OF BID 4.01 Bidder will complete the Work in accordance with the Contract Documents at the unit prices shown in the BID FORM. A. Extended amounts have been computed in accordance with Paragraph 13.03 of the General Conditions. B. Bidder acknowledges that the estimated quantities are not guaranteed, and final payment for all Unit Price items will be based on actual quantities provided, measured as provided in the Contract Documents. C. Unit Price and figures column will be used to compute the actual Bid price. ARTICLE 5 — EVALUATION OF BIDDERS 5.01 The contract may be awarded either to the lowest responsible bidder or to the bidder who provides the best value for the Owner. The Owner will consider the amount bid, the Bidder's responsibility, the Bidder's safety record, the Bidder's indebtedness to Owner and whether the Bidder has met the minimum specific project experience requirements to determine the lowest responsible Bidder. The Owner reserves the right to waive any and all irregularities in determining the Bidders' responsibility or value, and whether the Bidder has met the minimum specific project experience requirements, and reserves the right to require the submission of additional information. 5.02 The Owner has the right to accept a Bid, reject any and all Bids, to waive any and all irregularities in the Bids, or to reject non -conforming, non-responsive or conditional Bids. In addition, the Owner reserves the right to reject any Bid where circumstances and developments have, in the opinion of the Owner, changed the responsibility of the Bidder. Bid Acknowledgement Form O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 003000-3 Rev 01-13-2016 5.03 Material misstatements in the documentation submitted to determine the Bidder's responsibility, including information submitted per SECTION 00 45 16 STATEMENT OF EXPERIENCE, may be grounds for rejection of the Bidder's Bid on this Project. Any such misstatement, if discovered after award of the Contract to such Bidder, may be grounds for immediate termination of the Contract. Additionally, the Bidder will be liable to the Owner for any additional costs or damages to the Owner resulting from such misstatements, including costs and attorney's fees for collecting such costs and damages. ARTICLE 6 — TIME OF COMPLETION 6.01 Bidder will complete the Work required to be substantially completed within 365 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions. Bidder will complete the Work required for final payment in accordance with Paragraph 15.06 of the General Conditions within 395 days after the date when the Contract Times commence to run. 6.02 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within the number of days indicated. ARTICLE 7 — ATTACHMENTS TO THIS BID In compliance with the Bid Requirements in SECTION 00 21 13 INVITATION TO BID AND INSTRUCTIONS TO BIDDERS, the following are made a condition of this Bid: A. Bid Security. B. SECTION 00 30 00 BID ACKNOWLEDGEMENT FORM and documentation of signatory authority. C. SECTION 00 30 01 BID FORM. D. SECTION 00 30 02 COMPLIANCE TO STATE LAW ON NONRESIDENT BIDDERS. E. SECTION 00 30 05 DISCLOSURE OF INTEREST. F. SECTION 00 30 06 NON -COLLUSION CERTIFICATION. G. SECTION 00 45 16 STATEMENT OF EXPERIENCE ARTICLE 8 — DEFINED TERMS 8.01 The terms used in this Bid have the meanings indicated in the General Conditions and the Supplementary Conditions. The significance of terms with initial capital letters is described in the General Conditions. ARTICLE 9 — VENUE 9.01 Bidder agrees that venue shall lie exclusively in Nueces County, Texas for any legal action. Bid Acknowledgement Form O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 003000-4 Rev 01-13-2016 ARTICLE 10 —SIGNATORY REQUIREMENTS FOR BIDDERS 10.01 Bidders must include their correct legal name, state of residency, and federal tax identification number in the Bid Form. 10.02 The Bidder, or the Bidder's authorized representative, shall sign and date the Bid Form to accompany all materials included in the submitted Bid. Bids which are not signed and dated in this manner, or which do not contain the required documentation of signatory authority may be rejected as non-responsive. The individual(s) signing the Bid must have the authority to bind the Bidder to a contract, and if required, shall attach documentation of signatory authority to the Bid Form. 10.03 Bidders who are individuals ("natural persons" as defined by the Texas Business Organizations Code §1.002), but who will not be signing the Bid Form personally, shall include in their bid a notarized power of attorney authorizing the individual designated as their authorized representative to submit the Bid and to sign on behalf of the Bidder. 10.04 Bidders that are entities who are not individuals shall identify in their Bid their charter or Certificate of Authority number issued by the Texas Secretary of State and shall submit with their Bid a copy of a resolution or other documentation approved by the Bidder's governing body authorizing the submission of the Bid and designating the individual(s) authorized to execute documents on behalf of the Bidder. Bidders using an assumed name (an "alias") shall submit a copy of the Certificate of Assumed Name or similar document. 10.05 Bidders that are not residents of the State of Texas must document their legal authority to conduct business in Texas. Nonresident Bidders that have previously registered with the Texas Secretary of State may submit a copy of their Certificate of Authority. Nonresident Bidders that have not previously registered with the Texas Secretary of State shall submit a copy of the Bidder's enabling documents as filed with the state of residency, or as otherwise existing. Bid Acknowledgement Form O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 003000-5 Rev 01-13-2016 ARTICLE 11— BID SUBMITTAL 11.01 This Bid is submitted by: Bidder: By: Name: Title: Attest: (typed or printed full legal name of Bidder) (individual's signature) (typed or printed) (typed or printed) State of Residency: Federal Tax Id. No. Address for giving notices: (individual's signature) Phone: Email: (Attach evidence of authority to sign if the authorized individual is riot the Bidder, but an individual signing on behalf of another individual Bidder, or if the authorized individual is a representative of a corporation, partnership, or joint venture.) END OF SECTION Bid Acknowledgement Form O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 003000-6 Rev 01-13-2016 00 30 01 BID FORM Project Name: O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 Project Number: E16246 Owner: City of Corpus Christi Bidder: PART A - RENEWABLE (per SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) OAR: LNV, Inc. Designer: LNV, Inc. Basis of Bid Item DESCRIPTION UNIT QUANTITY (Bid Evaluation ONLY - NOT FOR AWARD) UNIT PRICE EXTENDED AMOUNT Base Bid PART A - RENEWABLE (per SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) Al Mobilization/Demobilization, Complete in Place per Lump Sum. LS 1 A2 Dredge, Dewater and Haul residuals from Lagoon #7 including all work and materials considered subsidiary to this bid item (subsidiary items include but are not limited to; furnishing dredge equipment, furnish and install turbidity protection for washwater return pump station, furnish and install dewatering equipment, polymer injection equipment, residual and polymer containment areas as required, filtrate return provisions, trucks, fuel, truck maintenance, maintenance of access, electrical feed for dewatering equipment, permits, licenses and certifications as required, and residual analytical testing) as per specification, Complete in Place per Dry Ton. DT 10,000 A3 Remove cattails and other aquatic vegetation from Lagoon #7, as necessary to perform the required dredging, Complete in Place per Lump Sum. LS 1 SUBTOTAL PART A - RENEWABLE (Items Al thru A2) TOTAL EXTENDED AMOUNT FOR ITEM A2 IS FOR BID EVALUATION PURPOSES ONLY Bid Form O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (E16246) Page 1 of 2 Rev D1-13-2016 00 30 01 BID FORM BID SUMMARY SUBTOTAL PART A - RENEWABLE (Items Al thru A8) SUBTOTAL PART 6 RENEWABLE (Items 61 thru 62) SUBTOTAL PART C RTA IMPROVEMENTS (Items Cl thru C[Y.]) SUBTOTAL PART D ADA IMPROVEMENTS (Items D1 thru D[X]) SUBTOTAL PART E DRAINAGE IMPROVEMENTS (Items El thru E[X]) SUBTOTAL PART F WATER IMPROVEMENTS (Items F1 thru FY) SUBTOTAL PART H ALLOWANCES (Items H1 thru H1) TOTAL PROJECT BASE BID (PARTS A THRU H) SUBTOTAL PART 1 ADDITIVE ALTERNATE NO. 1 (Items 11 thru 12) TOTAL PROJECT ADDITIVE ALTERNATE NO. 1 (PART I) Contract Times $ $ Bidder agrees to reach Substantial Completion in 365 days Bidder agrees to reach Final Completion in 395 days Bid Fort O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (E16246) Page 2 of 2 Rev 01-13-2016 00 30 02 COMPLIANCE TO STATE LAW ON NONRESIDENT BIDDERS Chapter 2252 of the Texas Government Code applies to the award of government contract to nonresident bidders. This law provides that: "a government entity may not award a governmental contract to a nonresident bidder unless the nonresident underbids the lower bid submitted by a responsible resident bidder by an amount that. is not less than the amount by which a resident bidder would be required to underbid the nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located." "Nonresident bidder" refers to a person who is not a resident of Texas. "Resident bidder" refers to a person whose principal place of business is in this state, including a contractor whose ultimate parent company or majority owner has its principal place of business in this state. Check the statement that is correct for Bidder. ❑ Bidder qualifies as a nonresident bidder whose principal place of business or residency is in the State of ❑ Bidder (includes parent company or majority owner) qualifies as a resident bidder whose principal place of business is in the State of Texas. The Owner will use the information provided in the State of Texas Comptroller's annual publication of other states' laws on contracts to evaluate the Bids of nonresident Bidders. Bidder: Company Name: By: Name: Title: Business address: (typed or printed) (signature -- attach evidence of authority to sign) (typed or printed) Phone: Email: END OF SECTION Compliance to State Law on Nonresident Bidders 00 30 02 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 00 30 06 NON -COLLUSION CERTIFICATION STATE OF TEXAS COUNTY OF NUECES OWNER: City of Corpus Christi, Texas 1201 Leopard Street Corpus Christi, Texas 78401 CONTRACT: D.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 Project No. E16246 Bidder certifies that the it has not been a party to any collusion among Bidders in the restraint of freedom of competition by agreement to submit a Bid at a fixed price or to refrain from bidding; or with any official or employee of the Owner as to quantity, quality, or price in the prospective contract, or any other terms of said prospective contract; or in any discussion between Bidders and any official of the Owner concerning exchange of money or other thing of value for special consideration in the letting of a contract. Company Name: By: Name: Title: Business address: (typed or printed) (signature -- attach evidence of authority to sign) (typed or printed) Phone: Email: Non -Collusion Certification END OF SECTION O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 003006-1 11-25-2013 00 45 16 STATEMENT OF EXPERIENCE ARTICLE 1— REQUIREMENT TO PROVIDE A STATEMENT OF EXPERIENCE 1.01 To be considered a responsive Bidder, Bidders must complete and submit the Statement of Experience with the Bids to demonstrate the Bidders' responsibility and ability to meet the minimum requirements to complete the Work. Failure to submit the required information in the Statement of Experience will result in the Owner considering the Bid non-responsive and result in rejection of the Bid by the Owner. The Bid Security of the Bidder will be forfeited if Bidder fails to deliver the Statement of Experience in an attempt to be released from its Bid. Bidders may be required to provide supplemental information if requested by the Owner to clarify, enhance or supplement the information provided in the Statement of Experience. 1.02 Bidders must provide the information requested in this Statement of Experience using the forms attached to this Section. A copy of these forms can be provided in Microsoft Word to assist with the preparation of the Statement of Experience. Information in these forms must be provided completely and in detail. Information that cannot be totally incorporated in the form may be included in an attachment to the form. This attachment must be clearly referenced by attachment number in the form, and the attached material must include the attachment number on every sheet of the attachment. The attachment must include only the information that responds to the question or item number to which the attachment information applies. 1.03 The Bidder may also be required to supply a financial statement, prepared no later than 90 days prior to the City Engineer's request, signed and dated by the Bidder's owner, president or other authorized party, specifying all current assets and liabilities. ARTICLE 2 — EXPERIENCE REQUIREMENTS 2.01 The Bidder agrees that, in addition to determining the apparent low Bid, the Owner will consider the responsiveness of the Bids and the responsibility of the Bidders in awarding a Contract for this Project. Information that indicates the Bidder or a Subcontractor is not responsible or that might negatively impact a Bidder's ability to complete the Work within the Contract Time and for the Contract Price may result in the Owner rejecting the Bid. 2.02 If the apparent low Bidder is not deemed responsible, the Owner may evaluate the next apparent low Bidders in order until a Contract is awarded or all Bids have been rejected. 2.03 The Bidder is responsible for the accuracy and completeness of all of the information provided by the Bidder or a proposed Subcontractor in response to this Statement of Experience. 2.04 Provide general information about the organization as required in Table 1. Describe the organizational structure of the Bidder's organization as it relates to this Project in Table 2. 2.05 Provide resumes for the key personnel that will be actively working on this Project. A. Key personnel include the Project Manager, Project Superintendent, Safety Manager and Quality Control Manager. If key personnel are to fulfill more than one of the roles listed above, provide a written narrative describing how much time will be devoted to each function, their qualifications to fulfill each role, and the percentage of their time that will be devoted to each role. If the individual is not to be devoted solely to this Project, indicate how that individual's time is to be divided between this Project and other assignments. B. The Bidder may provide resumes for an alternate individual if the Bidder is not able to commit to one individual for the Project at the time the Bid is submitted. Qualifications of these individuals will be considered in determining whether the experience of the Bidder meets the minimum requirements. The Bidder must provide the services of the proposed key personnel for the life of the Project as a condition of Statement of Experience 00 45 16 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 06-22-2016 qualification. Failure to provide the proposed Key Personnel may result in the disqualification of the Bidder and may void the award of the Contract. C. Provide information for each primary and alternate candidate that includes: technical experience, managerial experience, education and formal training and a work history which describes project experience, including the roles and responsibilities for each assignment. Additional information demonstrating experience that meets the minimum requirements should also be included. D. The Project Manager and Project Superintendent must have at least 5 years of recent experience in the management and oversight of projects of a similar size and complexity to this Project. This experience must include scheduling of manpower and materials, safety, coordination of Subcontractors, experience with the submittal process, Federal and State wage rate requirements and contract close-out procedures. The Project Superintendent is to be present at the Site at all times that Work is being performed. Foremen must have at least 5 years of recent experience in similar work and be subordinate to the Project Superintendent. Foremen cannot act as a superintendent without prior written approval from the Owner. 2.06 Provide information on the project experience and past performance of the organization. A. Provide information on projects that have been awarded to the Organization in the last five (5) years in Table 3. Attach additional pages if necessary. Experience must include the satisfactory completion of at least five (5) similar projects within the last five (5) years for the Bidder's organization that are equal to or greater in size and magnitude than the current Project. Refer to Specification Section 46 76 11 for the minimum requirements for the projects listed to be consider equal to or greater in size and magnitude. B. In determining the responsibility of the Bidder, the Owner will consider the Bidder's past projects and any substandard quality of workmanship on completed projects. The Owner will consider whether the Bidder's past project experience shows substandard quality of workmanship, issues related to a substandard appearance of the completed work, the amount of warranty or rework required, problems with durability and maintainability of the completed project, and problems with the lack of quality of documentation provided. In addition to the work produced, the Owner may consider issues related to the quality of construction practices, responsiveness to the owner's needs during construction, an inability to work in the spirit of partnering and any non -responsiveness of the Bidder to make warranty corrections. Information to make this determination will come from Owner's interviews with references provided for this project. By listing reference contact information in this Statement of Experience, Bidder indicates its approval for OPT to contact the individuals listed as a reference. ARTICLE 3 — SAFETY EXPERIENCE REQUIREMENTS 3.01 The Bidder agrees that pursuant to Section 252.0435 of the Local Government Code, the Owner will consider the safety record of the Bidder prior to awarding contracts. The Owner has adopted the following written definitions and criteria for determining the Bidder's safety record. 3.02 The Bidder's safety record will be used to determine if the Bidder can be deemed responsible. 3.03 Provide general information about the safety record of the organization as required in Table 4. A. For purposes of providing this information, the following terms shall have the following meanings: 1. "Bidder" includes the firm, corporation, partnership, or other legal entity represented by the Bidder or anyone acting for such firm, corporation, partnership, or other legal entity submitting the bid. 2. "Citations" include notices of violation, notices of enforcement, suspension/revocation of state or federal licenses or registrations, fines assessed pending criminal complaints, indictments, convictions, administrative orders, draft orders, final orders, and judicial final judgments. Notice of Violations and Notice of Enforcement received from the TCEQ shall include those classified as major violations and Statement of Experience 00 45 16 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 06-22-2016 moderate violations under the TCEQ's regulations for documentation of Compliance History, 30 Texas Administrative Code, Chapter 60.2 (c) (1) and (2). 3. "Environmental Protection Agency" includes, but is not limited to the Texas Commission on Environmental Quality (the "TCEQ"), the United States Environmental Protection Agency (the "EPA"), the U.S. Fish and Wildlife Service, the U.S. Army Corps of Engineers, the Texas Department of State Health Services, the Texas Parks and Wildlife Department, the Structural Pest Control Service, agencies of local governments responsible for enforcing environmental protection laws or regulations, and similar regulatory agencies of other states of the United States. B. In determining the responsibility of the Bidder, the Owner will consider the following in regards to Table 4: 1. Whether the Bidder's response reveals more than two (2) cases in which final orders have been entered by the Occupational Safety and Health Review Commission (the "OSHRC") against the Bidder for serious violations of Occupational Safety and Health Administration ("OSHA") regulations within the past five (5) years. 2. Whether the Bidder's response reveals more than one (1) case in which Bidder has received a citation or for which final orders have been entered from an environmental protection agency for violations within the past five (5) years. 3. Whether the Bidder's response reveals that the Bidder has been convicted of a criminal offense or has been subject to a judgment for a negligent act or omission, which resulted in serious bodily injury or death, within the past ten (10) years. C. The Owner may consider the responses to each question in Table 4 separately when determining the responsibility of the Bidder. The Owner may also consider the cumulative impact of the information generated by the Bidder's responses. ARTICLE 4 — PROVIDE INFORMATION TO DEMONSTRATE THE ABILITY OF THE BIDDER TO PROVIDE SUBCONTRACTING OPPORTUNITIES THAT WILL MEET THE OWNER'S ESTABLISHED GOALS FOR MINORITY, MBE, AND DBE PARTICIPATION IN THE PROJECT. LIST ALL WORK TO BE PERFORMED BY QUALIFIED MINORITY, MBE AND DBE -PROPOSED SUBCONTRACTORS OR SUPPLIERS IN TABLE 5. INCLUDE PERCENTAGES OF WORK SUBCONTRACTED TO EACH TO DEMONSTRATE COMPLIANCE WITH OWNER'S STATED GOALS.STATEMENT OF EXPERIENCE REQUIREMENTS 4.01 Provide one printed copy of the Statement of Experience using the referenced tables and narrative descriptions as described in Article 2. Pages are to be 8-1/2 x 11 pages using a minimum font size of 10. A limited number of 11 x 17 sheets may be used, and must be folded to the size of an 8-1/2 x 11 page. 4.02 Provide a digital copy of the Statement of Experience in Portable Document Format (PDF) on a CD, portable drive, or other digital recording device. This digital copy is to include all information required to evaluate the Bid and should match the content of the printed copy of the Bid. When creating the digital copy: A. Create PDF documents from native format files. B. Rotate pages so that the top of the document appears at the top of the file when opened in PDF viewing software. C. Submit PDF documents with adequate resolution to allow documents to be printed in a format equivalent to the original documents. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. D. Submit color PDF documents if color is used in the printed version of the documents. Statement of Experience 00 45 16 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 06-22-2016 ARTICLE 5 — WORK PLAN, PROPOSED SCHEDULE, AND SITE EXHIBIT 5.01 Refer to Specification Section 46 76 11 for submittal requirements and include required documents in the statement of experience documents submitted with the bid Statement of Experience 00 45 16 - 4 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 06-22-2016 Table 1— Organization Information Organization doing business as: Business Address of Principal Office Telephone No. Website Form of Business (check one) • Corporation • Partnership ■ Individual If a Corporation State of Incorporation Date of Incorporation Chief Executive Officer's Name President's Name Vice President's Name(s) Secretary's Name Treasurer's Name If a Partnership Date of Organization 1 Form of Partnership: • General • Limited If an Individual Name Ownership of Organization List of companies, firms, or organizations that own any part of the organization. Names of Companies, Firms, or Organizations Percent Ownership Organization History List of names that this organization currently, has, or anticipates operating under including the names of related companies presently doing business. Names of Organizations From Date To Date Indicators of Organization Size Average number of current full-time employees Average estimate of revenue for the current year Statement of Experience O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 004516-5 Rev 06-22-2016 Table 1— Organization Information Organization doing business as: Previous History with City of Corpus Christi List the 5 most recent projects that have been completed with the City of Corpus Christi. Project Name Year 1 2 3 4 5 Construction Site Safety Experience Provide Bidders Experience Modification Ratio {EMR} History for the last 3 years. Provide documentation of the EMR. Year 1 EMR Year EMR Year EMR Previous Bidding and Construction Experience Has Bidder or a predecessor organization been disqualified as a bidder within the last 10 years? List Projects below and provide full details in a separate attachment if yes. Has Bidder or a predecessor organization been released from a bid or proposal in the past 10 years? List Projects below and provide full details in a separate attachment if yes. Has Bidder or a predecessor organization ever defaulted on a project or failed to complete any work awarded to it? List Projects below and provide full details in a separate attachment if yes. Has Bidder or a predecessor organization been involved in claims or litigation involving project owners within the last 10 years? List Projects below and provide full details in a separate attachment if yes. Have liens or claims for outstanding unpaid invoices been filed against the Bidder for services or materials on any projects begun within the preceding 3 years? Specify the name and address of the party holding the lien or making the claim, the amount and basis for the lien or claim, and an explanation of why the lien has not been released or that the claim has not been paid if yes. Statement of Experience O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 004516-6 Rev 06-22-2016 Table 2 — Project Information Organization doing business as: Proposed Project Organization Provide a brief description of the organizational structure proposed for this project indicating the names and functional roles of proposed key personnel and alternates. Provide resumes for Project Manager, Superintendent, Safety Manager and Quality Control Manager. Position Primary Alternate Project Manager Superintendent Safety Manager Quality Control Manager Division of work between Bidder and Proposed Subcontractor and Suppliers Provide a list of Work to be self -performed by the Bidder and the Work contracted to Subcontractors and Suppliers for more than 10 percent of the Work (based on estimated subcontract or purchase order amounts and the Contract Price). Description of Work Name of Entity Performing the Work Estimated Percentage of Contract Price Subcontractor Construction Site Safety Experience Provide Experience Modification Ratio (EMR) History for the last 3 years for Subcontractors that will provide Work valued at 25% or more of the Contract Price. Provide documentation of the EMR. Subcontractor Year EMR Year EMR Year EMR Subcontractor Year EMR Year EMR Year EMR Statement of Experience O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 004516-7 Rev 06-22-2016 Table 3 — Projects Awarded during the Last 5 Years Organization doing business as: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Contract Price Final Contract Price # Contract Days # Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Contract Price Final Contract Price # Contract Days # Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Contract Price Final Contract Price # Contract Days # Days Late Issues/Claims/ Litigation: Statement of Experience O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 004516-8 Rev 06-22-2016 Table 3 — Projects Awarded during the Last 5 Years — Not including City of Corpus Christi Projects Organization doing business as: Proiect Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Contract Price Final Contract Price # Contract Days # Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Contract Price Final Contract Price # Contract Days # Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Contract Price Final Contract Price # Contract Days # Days Late Issues/Claims/ Litigation: Statement of Experience O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 004516-9 Rev 06-22-2016 Table 3 — Projects Awarded during the Last 5 Years — Not including City of Corpus Christi Projects Organization doing business as: Proiect Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Contract Price Final Contract Price # Contract Days # Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Contract Price Final Contract Price # Contract Days # Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Contract Price Final Contract Price # Contract Days # Days Late Issues/Claims/ Litigation: Statement of Experience O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 00 45 16-10 Rev 06-22-2016 Table 4 — Safety Record Questionnaire and Statement of Bidder's Safety Experience Organization doing business as: Bidder's Safety Record and Experience Has the Bidder received any Citations for violations of OSHA within the past five (5) years? List Citations below (date and location of Citation) and provide full details in a separate attachment if yes. The full details must include the type of violation or offense, the final disposition of the violation or offense, if any, and the penalty assessed. Has the Bidder received any Citations for violations of environmental protection laws or regulations within the past five (5) years? List Citations below (date and location of Citation) and provide full details in a separate attachment if yes. The full details must include the type of violation or offense, the final disposition of the violation or offense, if any, and the penalty assessed. Has the Bidder, within the past ten (10) years, been convicted of a criminal offense or been subject to a judgment for a negligent act or omission, which resulted in serious bodily injury or death? List convictions or judgments below and provide full details in a separate attachment if yes. The Owner will consider the following information as additional support to make a determination as to the responsibility of the Bidder. The Bidder must answer the following questions and provide evidence that it meets minimum OSHA construction safety standards and has a lost time injury rate that does not exceed the limits established below: 1 Does the Bidder have a written construction safety program? ❑ Yes ❑ No 2 Does the Bidder conduct regular construction site safety inspections? ❑ Yes ❑ No 3 Does the Bidder have an active construction safety training program? ❑ Yes ❑ No 4 Does the Bidder, or affected subcontractor, have competent persons in the following areas (as applicable to the scope of the current Project): A. Scaffolding ❑ Yes ❑ No ❑ N/A B. Excavation ❑ Yes ❑ No ❑ N/A C. Cranes & Hoists ❑ Yes ❑ No ❑ N/A D. Electrical ❑ Yes ❑ No ❑ N/A Statement of Experience O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 00 45 16-11 Rev 06-22-2016 Table 4 — Safety Record Questionnaire and Statement of Bidder's Safety Experience Continued Organization doing business as: E. Fall Protection ❑ Yes ❑ No ❑ N/A F. Confined Spaces ❑ Yes ❑ No ❑ N/A G. Material Handling ❑ Yes ❑ No ❑ N/A H. Demolition ❑ Yes ❑ No ❑ N/A I. Steel Erection ❑ Yes ❑ No ❑ N/A J. Underground Construction ❑ Yes ❑ No ❑ N/A 5 Does the Bidder have a lost time injury rate and a total recordable injury rate of less than or equal to the national average for North American Industrial Classification System ("NAICS") Category 23 for each of the past five (5) years? Provide the Bidder's OSHA 300 and 300A logs for the past five (5) years in a separate attachment. ❑ Yes ❑ No 6 Does the Bidder have an experience modifier rate of 1.0 or less? Provide the Bidder's NCCI workers' compensation experience rating sheets for the past five (5) years in a separate attachment. ❑ Yes ❑ No 7 Has the Bidder had any OSHA inspections within the past six (6) months? Provide documentation showing the nature of the inspection, the findings, and the magnitude of the issues in a separate attachment if yes. ❑ Yes ❑ No Statement of Experience 00 45 16 - 12 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 06-22-2016 Table 5 — Demonstrated Minority, MBE, DBE Participation Organization doing business as Project Subcontractors and Suppliers Provide a list of anticipated Minority, MBE, DBE Subcontractors or Suppliers contracts that will be used to demonstrate compliance with the Owner's Minority/ MBE / DBE Participation Policy Name Work to be Provided Estimated % of Contract Price Statement of Experience O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 00 45 16-13 Rev 06-22-2016 ARTICLE 5 — CERTIFICATION 6.01 By submitting this Statement of Experience and related information, Bidder certifies that it has read this Statement of Experience and that Bidder's responses are true and correct and contain no material misrepresentations and that the individual signing below is authorized to make this certification on behalf of the Bidder's organization. The individual signing this certification shall attach evidence of individual's authority to bind the organization to an agreement. Bidder: By: Name: Title: (typed or printed) (individual's signature) (typed or printed) Designated Representative: Name: Title: Address: (typed or printed) Telephone No.: Email: END OF SECTION Statement of Experience 00 45 16 - 14 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 06-22-2016 00 52 23 AGREEMENT This Agreement, for the Project awarded on [insert Award Date], is between the City of Corpus Christi (Owner) and Owner and Contractor agree as follows: ARTICLE 1— WORK (Contractor). 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as: O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 City Project No. E16246 ARTICLE 2 — DESIGNER AND OWNER'S AUTHORIZED REPRESENTATIVE 2.01 The Project has been designed by: LNV, Inc. 801 Navigation Blvd., Suite 300 Corpus Christi, Texas, 78408 2.02 The Owner's Authorized Representative for this Project is: To Be Determined ARTICLE 3 — CONTRACT TIMES 3.01 Contract Times A. The Work is required to be substantially completed within 365 days after the date when the Contract Times commence to run as provided in the Notice to Proceed and is to be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 395 days after the date when the Contract Times commence to run. B. Milestones, and the dates for completion of each, are as defined in SECTION 0135 00 SPECIAL PROCEDURES. 3.02 Liquidated Damages A. Owner and Contractor recognize that time limits for specified Milestones, Substantial Completion, and completion and readiness for Final Payment as stated in the Contract Documents are of the essence of the Contract. Owner and Contractor recognize that the Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.01 and as adjusted in accordance with Paragraph 11.05 of the General Conditions. Owner and Contractor also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if Agreement O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 005223-1 Rev 06-22-2016 the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty): 1. Substantial Completion: Contractor shall pay Owner $0.00 for each day that expires after the time specified in Paragraph 3.01 for Substantial Completion until the Work is substantially complete. 2. Completion of the Remaining Work: Contractor agrees to pay Owner $0.00 for each day that expires after the time specified in Paragraph 3.01 for completion and readiness for final payment until the Work is completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions. 3. Liquidated damages for failing to timely attain Substantial Completion and Final Completion are not additive and will not be imposed concurrently. 4. Milestones: Contractor agrees to pay Owner liquidated damages as stipulated in SECTION 01 35 00 SPECIAL PROCEDURES for failure to meet Milestone completions. 5. The Owner will determine whether the Work has been completed within the Contract Times. B. Owner is not required to only assess liquidated damages, and Owner may elect to pursue its actual damages resulting from the failure of Contractor to complete the Work in accordance with the requirements of the Contract Documents. ARTICLE 4 — CONTRACT PRICE 4.01 Owner will pay Contractor for completion of the Work in accordance with the Contract Documents at the unit prices shown in the attached BID FORM. Unit prices have been computed in accordance with Paragraph 13.03 of the General Conditions. Contractor acknowledges that estimated quantities are not guaranteed, and were solely for the purpose of comparing Bids, and final payment for all unit price items will be based on actual quantities, determined as provided in the Contract Documents. Total Base Bid Price $ ARTICLE 5 — PAYMENT PROCEDURES 5.01 Submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by the OAR as provided in the General Conditions. 5.02 Progress Payments; Retainage: A. The Owner will make progress payments on or about the 25th day of each month during performance of the Work. Payment is based on Work completed in accordance with the Schedule of Values established as provided in the General Conditions. B. Progress payments equal to 95 percent of the total earned value to date for completed Work and properly stored materials will be made prior to Substantial Completion. The balance will be held as retainage. Agreement O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 005223-2 Rev 06-22-2016 C. Payment will be made for the amount determined per Paragraph 5.02.B, less the total of payments previously made and less set -offs determined in accordance with Paragraph 15.01 of the General Conditions. D. At the Owner's option, retainage may be required at a higher percentage rate if progress on the Project is considered to be unsatisfactory. If retainage in excess of the amount described above is held prior to Substantial Completion, the Owner will place the additional amount in an interest bearing account. Interest will be paid in accordance with Paragraph 6.01. E. At the Owner's option, Owner may pay Contractor 100 percent of the Work completed, less amounts withheld in accordance with Paragraph 15.01 of the General Conditions and less 200 percent of OAR's estimate of the value of Work to be completed or corrected to reach Substantial Completion. Owner may, at its sole discretion, elect to hold retainage in the amounts set forth above for progress payments prior to Substantial Completion if Owner has concerns with the ability of the Contractor to complete the remaining Work in accordance with the Contract Documents or within the time frame established by this Agreement. Release or reduction in retainage is contingent upon and consent of surety to the reduction in retainage. 5.03 Owner will pay the remainder of the Contract Price as recommended by OAR in accordance with Paragraph 15.06 of the General Conditions upon Final Completion and acceptance of the Work. ARTICLE 6 — INTEREST ON OVERDUE PAYMENTS AND RETAINAGE 6.01 The Owner is not obligated to pay interest on overdue payments except as required by Texas Government. Code Chapter 2251. 6.02 The Owner is not obligated to pay interest on moneys not paid except as provided in Texas Government Code Chapter 2252. ARTICLE 7 — CONTRACTOR'S REPRESENTATIONS 7.01 The Contractor makes the following representations: A. The Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. The Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. The Contractor is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work. D. The Contractor has carefully studied the following Site -related reports and drawings as identified in the Supplementary Conditions: 1. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; 2. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; Agreement O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 005223-3 Rev 06-22-2016 3. Underground Facilities referenced in reports and drawings; 4. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and 5. Technical Data related to each of these reports and drawings. E. The Contractor has considered the: 1. Information known to Contractor; 2. Information commonly known to contractors doing business in the locality of the Site; 3. Information and observations obtained from visits to the Site; and 4. The Contract Documents. F. The Contractor has considered the items identified in Paragraphs 7.01.D and 7.01.E with respect to the effect of such information, observations, and documents on: 1. The cost, progress, and performance of the Work; 2. The means, methods, techniques, sequences, and procedures of construction to be employed by Contractor; and 3. Contractor's safety precautions and programs. G. Based on the information and observations referred to in the preceding paragraphs, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. H. The Contractor is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. I. The Contractor has correlated the information known to the Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. J. The Contractor has given the OAR written notice of all conflicts, errors, ambiguities, or discrepancies that the Contractor has discovered in the Contract Documents, and the written resolution provided by the OAR is acceptable to the Contractor. K. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. L. Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. ARTICLE 8 — ACCOUNTING RECORDS 8.01 Accounting Record Availability: The Contractor shall keep such full and detailed accounts of materials incorporated and labor and equipment utilized for the Work consistent with the requirements of Paragraph 13.01 of the General Conditions and as may be necessary for proper Agreement O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 005223-4 Rev 06-22-2016 financial management under this Agreement. Subject to prior written notice, the Owner shall be afforded reasonable access during normal business hours to all of the Contractor's records, books, correspondence, instructions, drawings, receipts, vouchers, memoranda, and similar data relating to the Cost of the Work and the Contractor's fee. The Contractor shall preserve all such documents for a period of 3 years after the final payment by the Owner. ARTICLE 9 — CONTRACT DOCUMENTS 9.01 Contents: A. The Contract Documents consist of the following: 1. Specifications, forms, and documents listed in SECTION 00 0100 TABLE OF CONTENTS. 2. Drawings listed in the Sheet Index. 3. Addenda. 4. Exhibits to this Agreement: a. Contractor's Bid Form. 5. Documentation required by the Contract Documents and submitted by Contractor prior to Notice of Award. B. There are no Contract Documents other than those listed above in this Article. C. The Contract Documents may only be amended, modified, or supplemented as provided in Article 11 of the General Conditions. ARTICLE 10 — CONTRACT DOCUMENT SIGNATURES One original of the signed Agreement will be required. The sequence of signatures will be completed in the following order: A. CONTRACTOR — Agreement must be signed by a person authorized to bind the firm or company. If Contractor is a Corporation, agreements must be Attested; B. ASSISTANT CITY ATTORNEY for the City; C. DIRECTOR OF ENGINEERING SERVICES; D. CITY SECRETARY for the City ATTEST CITY OF CORPUS CHRISTI Rebecca Huerta City Secretary J.H. Edmonds, P.E. Director of Engineering Services Agreement O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 005223-5 Rev 06-22-2016 APPROVED AS TO LEGAL FORM: Janet L. Kellogg Assistant City Attorney ATTEST (IF CORPORATION) CONTRACTOR (Seal Below) By: Note: Attach copy of authorization to sign if person signing for CONTRACTOR is not President, Vice President, Chief Executive Officer, or Chief Financial Officer Title: Address City State Zip Phone Fax EMail END OF SECTION Agreement O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 005223-6 Rev 06-22-2016 00 61 13 PERFORMANCE BOND BOND NO. Contractor as Principal Name: Mailing address (principal place of business): Owner Name: City of Corpus Christi, Texas Mailing address (principal place of business): Engineering Services 1201 Leopard Street Corpus Christi, Texas 78401 Contract Project name and number: Award Date of the Contract: Contract Price: Bond Date of Bond: (Date of Bond cannot be earlier than Award Date of the Contract) Said Principal and Surety have signed and sealed this instrument in 4 copies, each one of which shall be deemed an original. Surety Name: Mailing address (principal place of business): Physical address (principal place of business): Surety is a corporation organized and existing under the laws of the state of: By submitting this Bond, Surety affirms its authority to do business in the State of Texas and its license to execute bonds in the State of Texas. Telephone (main number): Telephone (for notice of claim): Local Agent for Surety Name: Address: Telephone: E -Mail Address: The address of the surety company to which any notice of claim should be sent may be obtained from the Texas Dept. of Insurance by calling the following toll-free number: 1-800-252-3439 Performance Bond O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 006113-1 Rev 01-13-2016 Surety and Contractor, intending to be legally bound and obligated to Owner do each cause this Performance Bond to be duly executed on its behalf by its authorized officer, agent or representative. The Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally to this bond. The condition of this obligation is such that if the Contractor as Principal faithfully performs the Work required by the Contract then this obligation shall be null and void; otherwise the obligation is to remain in full force and effect. Provisions of the bond shall be pursuant to the terms and provisions of Chapter 2253 and Chapter 2269 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter to the same extent as if it were copied at length herein. Venue shall lie exclusively in Nueces County, Texas for any legal action. Contractor as Principal Signature: Surety Signature: Name: Name: Title: Title: Email Address: Email Address: (Attach Power of Attorney and place surety seal below) END OF SECTION Performance Bond O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 006113-2 Rev 01-13-2016 00 61 16 PAYMENT BOND BOND NO. Contractor as Principal Name: Mailing address (principal place of business): Owner Name: City of Corpus Christi, Texas Mailing address (principal place of business): Engineering Services 1201 Leopard Street Corpus Christi, Texas 78401 Contract Project name and number: Award Date of the Contract: Contract Price: Bond Date of Bond: (Date of Bond cannot be earlier than Award Date of Contract) Said Principal and Surety have signed and sealed this instrument in 4 copies, each one of which shall be deemed an original. Surety Name: Mailing address (principal place of business): Physical address (principal place of business): Surety is a corporation organized and existing under the laws of the state of: By submitting this Bond, Surety affirms its authority to do business in the State of Texas and its license to execute bonds in the State of Texas. Telephone (main number): Telephone (for notice of claim): Local Agent for Surety Name: Address: Telephone: E -Mail Address: The address of the surety company to which any notice of claim should be sent may be obtained from the Texas Dept. of Insurance by calling the following toll-free number: 1-800-252-3439 Payment Bond Form O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 00 61 16 - 1 Rev. 01-13-2016 Surety and Contractor, intending to be legally bound and obligated to Owner do each cause this Payment Bond to be duly executed on its behalf by its authorized officer, agent or representative. The Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally to this bond. The condition of this obligation is such that if the Contractor as Principal pays all claimants providing labor or materials to him or to a Subcontractor in the prosecution of the Work required by the Contract then this obligation shall be null and void; otherwise the obligation is to remain in full force and effect. Provisions of the bond shall be pursuant to the terms and provisions of Chapter 2253 and Chapter 2269 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter to the same extent as if it were copied at length herein. Venue shall lie exclusively in Nueces County, Texas for any legal action. Contractor as Principal Signature: Surety Signature: Name: Name: Title: Title: Email Address: Email Address: (Attach Power of Attorney and place surety seal below) END OF SECTION Payment Bond Form O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 006116-2 Rev. 01-13-2016 00 72 00 GENERAL CONDITIONS Table of Contents Page Article 1— Definitions and Terminology 6 1.01 Defined Terms 6 1.02 Terminology 11 Article 2 — Preliminary Matters 12 2.01 Delivery of Bonds and Evidence of Insurance 12 2.02 Copies of Documents 13 2.03 Before Starting Construction 13 2.04 Preconstruction Conference; Designation of Authorized Representatives 13 Article 3 — Contract Documents: Intent, Requirements, Reuse 13 3.01 Intent 13 3.02 Reference Standards 15 3.03 Reporting and Resolving Discrepancies 15 3.04 Interpretation of the Contract Documents 16 3.05 Reuse of Documents 16 Article 4 — Commencement and Progress of the Work 16 4.01 Commencement of Contract Times; Notice to Proceed 16 4.02 Starting the Work 16 4.03 Progress Schedule 17 4.04 Delays in Contractor's Progress 17 Article 5 — Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions 18 5.01 Availability of Lands 18 5.02 Use of Site and Other Areas 18 5.03 Subsurface and Physical Conditions 19 5.04 Differing Subsurface or Physical Conditions 19 5.05 Underground Facilities 21 5.06 Hazardous Environmental Conditions at Site 22 Article 6 — Bonds and Insurance 24 6.01 Performance, Payment, and Other Bonds 24 6.02 Licensed Sureties 24 General Conditions Corpus Christi Standards - Regular Projects 007200-1 03-23-2015 6.03 Insurance 25 Article 7 — Contractor's Responsibilities 25 7.01 Supervision and Superintendence 25 7.02 Labor; Working Hours 25 7.03 Services, Materials, and Equipment 26 7.04 Concerning Subcontractors, Suppliers, and Others 26 7.05 Patent Fees and Royalties 27 7.06 Permits 28 7.07 Taxes 28 7.08 Laws and Regulations 28 7.09 Safety and Protection 29 7.10 Safety Representative 30 7.11 Hazard Communication Programs 30 7.12 Emergencies 30 7.13 Contractor's General Warranty and Guarantee 30 7.14 Indemnification ..... 31 7.15 Delegation of Professional Design Services 32 Article 8 — Other Work at the Site 33 8.01 Other Work 33 8.02 Coordination 34 8.03 Legal Relationships 34 Article 9 — Owner's and OPT's Responsibilities 35 9.01 Communications to Contractor 35 9.02 Replacement of Owner's Project Team Members 35 9.03 Furnish Data 35 9.04 Pay When Due... 35 9.05 Lands and Easements; Reports and Tests 35 9.06 Insurance 35 9.07 Modifications 35 9.08 Inspections, Tests, and Approvals 35 9.09 Limitations on OPT's Responsibilities 35 9.10 Undisclosed Hazardous Environmental Condition 36 9.11 Compliance with Safety Program 36 General Conditions Corpus Christi Standards - Regular Projects 007200-2 03-23-2015 Article 10 — OAR's and Designer's Status During Construction 36 10.01 Owner's Representative 36 10.02 Visits to Site 36 10.03 Resident Project Representatives 36 10.04 Rejecting Defective Work 36 10.05 Shop Drawings, Modifications and Payments 36 10.06 Decisions on Requirements of Contract Documents and Acceptability of Work 37 10.07 Limitations on OAR's and Designer's Authority and Responsibilities ..37 Article 11— Amending the Contract Documents; Changes in the Work .. 37 11.01 Amending and Supplementing the Contract Documents 37 11.02 Owner -Authorized Changes in the Work ..38 11.03 Unauthorized Changes in the Work 38 11.04 Change of Contract Price 39 11.05 Change of Contract Times 40 11.06 Change Proposals 40 11.07 Execution of Change Orders 40 11.08 Notice to Surety .41 Article 12 — Claims 42 12.01 Claims 42 12.02 Claims Process 42 Article 13 — Cost of the Work; Allowances; Unit Price Work 43 13.01 Cost of the Work 43 13.02 Allowances 46 13.03 Unit Price Work 46 13.04 Contingencies 47 Article 14 — Tests and Inspections; Correction, Removal, or Acceptance of Defective Work 47 14.01 Access to Work 47 14.02 Tests, Inspections, and Approvals 47 14.03 Defective Work 48 14.04 Acceptance of Defective Work 49 14.05 Uncovering Work 49 14.06 Owner May Stop the Work 49 14.07 Owner May Correct Defective Work ..50 General Conditions Corpus Christi Standards - Regular Projects 007200-3 03-23-2015 Article 15 — Payments to Contractor; Set -Offs; Completion; Correction Period 50 15.01 Progress Payments 50 15.02 Contractor's Warranty of Title 52 15.03 Substantial Completion 52 15.04 Partial Utilization 53 15.05 Final Inspection 53 15.06 Final Payment 53 15.07 Waiver of Claims 54 15.08 Correction Period 54 Article 16 — Suspension of Work and Termination 55 16.01 Owner May Suspend Work 55 16.02 Owner May Terminate for Cause 55 16.03 Owner May Terminate For Convenience 56 Article 17 — Final Resolution of Disputes 57 17.01 Methods and Procedures 57 Article 18 — Miscellaneous 57 18.01 Computation of Times 57 18.02 Owner's Right to Audit Contractor's Records 57 18.03 Independent Contractor 58 18.04 Cumulative Remedies 58 18.05 Limitation of Damages 58 18.06 No Waiver 58 18.07 Severability 58 18.08 Survival of Obligations 59 18.09 No Third Party Beneficiaries 59 18.10 Assignment of Contract 59 18.11 No Waiver of Sovereign Immunity 59 18.12 Controlling Law 59 18.13 Conditions Precedent to Right to Sue 59 18.14 Waiver of Trial by Jury 59 18.15 Attorney Fees 59 18.16 Compliance with Laws 59 18.17 Enforcement 60 General Conditions Corpus Christi Standards - Regular Projects 007200-4 03-23-2015 18.18 Subject to Appropriation 60 18.19 Contract Sum 60 18.20 Contractor's Guarantee as Additional Remedy 60 General Conditions Corpus Christi Standards - Regular Projects QO7lO0 5 03-23-2015 ARTICLE 1— DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. A term with initial capital letters, including the term's singular and plural forms, has the meaning indicated in this paragraph wherever used in the Bidding Requirements or Contract Documents. In addition to the terms specifically defined, terms with initial capital letters in the Contract Documents may include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda - Documents issued prior to the receipt of Bids which clarify or modify the Bidding Requirements or the proposed Contract Documents. 2. Agreement - The document executed between Owner and Contractor covering the Work. 3. Alternative Dispute Resolution - The process by which a disputed Claim may be settled as an alternative to litigation, if Owner and Contractor cannot reach an agreement between themselves. 4. Application for Payment - The forms used by Contractor to request payments from Owner and the supporting documentation required by the Contract Documents. 5. Award Date — The date the City Council of the City of Corpus Christi (City) authorizes the City Manager or designee to execute the Contract on behalf of the City. 6. Bid - The documents submitted by a Bidder to establish the proposed Contract Price and Contract Times and provide other information and certifications as required by the Bidding Requirements. 7. Bidding Documents - The Bidding Requirements, the proposed Contract Documents, and Addenda. 8. Bidder - An individual or entity that submits a Bid to Owner. 9. Bidding Requirements - The Invitation for Bids, Instructions to Bidders, Bid Security, Bid Form and attachments, and required certifications. 10. Bid Security - The financial security in the form of a bid bond provided by Bidder at the time the Bid is submitted and held by Owner until the Agreement is executed and the evidence of insurance and Bonds required by the Contract Documents are provided. A cashier's check, certified check, money order or bank draft from any State or National Bank will also be acceptable. 11. Bonds - Performance Bond, Payment Bond, Maintenance Bond, and other Surety instruments executed by Surety. When in singular form, refers to individual instrument. 12. Change Order - A document issued on or after the Effective Date of the Contract and signed by Owner and Contractor which modifies the Work, Contract. Price, Contract Times, or terms and conditions of the Contract. General Conditions Corpus Christi Standards - Regular Projects 007200-6 03-23-2015 13. Change Proposal - A document submitted by Contractor in accordance with the requirements of the Contract Documents: a. Requesting an adjustment in Contract Price or Contract Times; b. Contesting an initial decision concerning the requirements of the Contract Documents or the acceptability of Work under the Contract Documents; c. Challenging a set-off against payment due; or d. Seeking a Modification with respect to the terms of the Contract. 14. City Engineer - The Corpus Christi City Engineer and/or his designated representative as identified at the preconstruction conference or in the Notice to Proceed. 15. Claim - A demand or assertion by Owner or Contractor submitted in accordance with the requirements of the Contract Documents. A demand for money or services by an entity other than the Owner or Contractor is not a Claim. 16. Constituent of Concern - Asbestos, petroleum, radioactive materials, polychlorinated biphenyls (PCBs), hazardous wastes, and substances, products, wastes, or other materials that are or become listed, regulated, or addressed pursuant to: a. The Comprehensive Environmental Response, Compensation and Liability Act, 42 U.S.C. §§9601 et seq. ("CERCLA"); b. The Hazardous Materials Transportation Act, 49 U.S.C. §§5501 et seq.; c. The Resource Conservation and Recovery Act, 42 U.S.C. §§6901 et seq. ("RCRA"); d. The Toxic Substances Control Act, 15 U.S.C. §§2601 et seq.; e. The Clean Water Act, 33 U.S.C. §§1251 et seq.; f. The Clean Air Act, 42 U.S.C. §§7401 et seq.; or g. Any other Laws or Regulations regulating, relating to, or imposing liability or standards of conduct concerning hazardous, toxic, or dangerous waste, substance, or material. 17. Contract - The entire integrated set of documents concerning the Work and describing the relationship between the Owner and Contractor. 18. Contract Amendment - A document issued on or after the Effective Date of the Contract and signed by Owner and Contractor which: a. Authorizes new phases of the Work and establishes the Contract Price, Contract Times, or terms and conditions of the Contract for the new phase of Work; or b. Modifies the terms and conditions of the Contract, but does not make changes in the Work. 19. Contract Documents - Those items designated as Contract Documents in the Agreement. 20. Contract Price - The monetary amount stated in the Agreement and as adjusted by Modifications, and increases or decreases in unit price quantities, if any, that Owner has agreed to pay Contractor for completion of the Work in accordance with the Contract Documents. General Conditions Corpus Christi Standards - Regular Projects 007200-7 03-23-2015 21. Contract Times - The number of days or the dates by which Contractor must: a. Achieve specified Milestones; b. Achieve Substantial Completion; and c. Complete the Work. 22. Contractor - The individual or entity with which Owner has contracted for performance of the Work. 23. Contractor's Team - Contractor and Subcontractors, Suppliers, individuals, or entities directly or indirectly employed or retained by them to perform part of the Work or anyone for whose acts they may be liable. 24. Cost of the Work - The sum of costs incurred for the proper performance of the Work as allowed by Article 13. 25. Defective - When applied to Work, refers to Work that is unsatisfactory, faulty, or deficient in that it: a. Does riot conform to the Contract. Documents; b. Does not meet the requirements of applicable inspections, reference standards, tests, or approvals referred to in the Contract Documents; or c. Has been damaged or stolen prior to OAR's recommendation of final payment unless responsibility for the protection of the Work has been assumed by Owner at Substantial Completion in accordance with Paragraphs 15.03 or 15.04. 26. Designer - The individuals or entity named as Designer in the Agreement and the subconsultants, individuals, or entities directly or indirectly employed or retained by Designer to provide design or other technical services to the Owner. Designer has responsibility for engineering or architectural design and technical issues related to the Contract Documents. Designers are Licensed Professional Engineers or Registered Architects qualified to practice their profession in the State of Texas. 27. Drawings - The part of the Contract that graphically shows the scope, extent, and character of the Work. Shop Drawings and other Contractor documents are not Drawings. 28. Effective Date of the Contract - The date indicated in the Agreement on which the City Manager or designee has signed the Contract. 29. Field Order - A document issued by OAR or Designer requiring changes in the Work that do not change the Contract Price or the Contract Times. 30. Hazardous Environmental Condition - The presence of Constituents of Concern at the Site in quantities or circumstances that may present a danger to persons or property exposed to Constituents of Concern. The presence of Constituents of Concern at the Site necessary for the execution of the Work or to be incorporated in the Work is not a Hazardous Environmental Condition provided these Constituents of Concern are controlled and contained pursuant to industry practices, Laws and Regulations, and the requirements of the Contract. General Conditions Corpus Christi Standards - Regular Projects 007200-8 03-23-2015 31. Indemnified Costs - All costs, losses, damages, and legal or other dispute resolution costs resulting from claims or demands against Owner's Indemnitees. These costs include fees for engineers, architects, attorneys, and other professionals. 32. Laws and Regulations; Laws or Regulations - Applicable laws, statutes, rules, regulations, ordinances, codes, and orders of governmental bodies, agencies, authorities, and courts having jurisdiction over the Project. 33. Liens - Charges, security interests, or encumbrances upon Contract related funds, real property, or personal property. 34. Milestone - A principal event in the performance of the Work that Contractor is required by Contract to complete by a specified date or within a specified period of time. 35. Modification - Change made to the Contract Documents by one of the following methods: a. Contract Amendment; b. Change Order; c. Field Order; or d. Work Change Directive. 36. Notice of Award - The notice of Owner's intent to enter into a contract with the Selected Bidder. 37. Notice to Proceed - A notice to Contractor of the Contract Times and the date Work is to begin. 38. Owner - The City of Corpus Christi (City), a Texas home -rule municipal corporation and political subdivision organized under the laws of the State of Texas, acting by and through its duly authorized City Manager and his designee, the City Engineer (the Director of Engineering Services), and the City's officers, employees, agents, or representatives, authorized to administer design and construction of the Project. 39. Owner's Authorized Representative or OAR - The individual or entity named as OAR in the Agreement and the consultants, subconsultants, individuals, or entities directly or indirectly employed or retained by them to provide construction management services to the Owner. The OAR may be an employee of the Owner. 40. Owner's Indemnitees - Each member of the OPT and their officers, directors, members, partners, employees, agents, consultants, and subcontractors. 41. Owner's Project Team or OPT - The Owner, Owner's Authorized Representative, Resident Project Representative, Designer, and the consultants, subconsultants, individuals, or entities directly or indirectly employed or retained by them to provide services to the Owner. 42. Partial Occupancy or Use - Use by Owner of a substantially completed part of the Work for the purpose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work. General Conditions Corpus Christi Standards - Regular Projects 007200-9 03-23-2015 43. Progress Schedule - A schedule prepared and maintained by Contractor, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Times. 44. Project - The total undertaking to be accomplished for Owner under the Contract Documents. 45. Resident Project Representative or RPR - The authorized representative of OPT assigned to assist OAR at the Site. As used herein, the term Resident Project Representative includes assistants and field staff of the OAR. 46. Samples - Physical examples of materials, equipment, or workmanship representing some portion of the Work that are used to establish the standards for that portion of the Work. 47. Schedule of Documents - A schedule of required documents, prepared, and maintained by Contractor. 48. Schedule of Values - A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for Contractor's Applications for Payment. 49. Selected Bidder - The Bidder to which Owner intends to award the Contract. 50. Shop Drawings - All drawings, diagrams, illustrations, schedules, and other data or information that are specifically prepared or assembled and submitted by Contractor to illustrate some portion of the Work. Shop Drawings, whether approved or not, are not Drawings and are not Contract Documents. 51. Site - Lands or areas indicated in the Contract Documents as being furnished by Owner upon which the Work is to be performed. The Site includes rights-of-way, easements, and other lands furnished by Owner which are designated for use by the Contractor. 52. Specifications - The part of the Contract that describes the requirements for materials, equipment, systems, standards, and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable to the Work. 53. Subcontractor - An individual or entity having a direct contract with Contractor or with other Subcontractors or Suppliers for the performance of a part of the Work. 54. Substantial Completion - The point where the Work or a specified part of the Work is sufficiently complete to be used for its intended purpose in accordance with the Contract Documents. 55. Supplementary Conditions - The part of the Contract that amends or supplements the General Conditions. 56. Supplier - A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with Subcontractors or other Suppliers to furnish materials or equipment to be incorporated in the Work. 57. Technical Data - Those items expressly identified as Technical Data in the Supplementary Conditions with respect to either: a. Subsurface conditions at the Site; General Conditions Corpus Christi Standards - Regular Projects 00 72 00-10 03-23-2015 b. Physical conditions relating to existing surface or subsurface structures at the Site, except Underground Facilities; or c. Hazardous Environmental Conditions at the Site. 58. Underground Facilities - All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, other similar facilities or appurtenances, and encasements containing these facilities which are used to convey electricity, gases, steam, liquid petroleum products, telephone or other communications, fiber optic transmissions, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 59. Unit Price Work - Work to be paid for on the basis of unit prices. 60. Work - The construction of the Project or its component parts as required by the Contract Documents. 61. Work Change Directive - A directive issued to Contractor on or after the Effective Date of the Contract ordering an addition, deletion, or revision in the Work. The Work Change Directive serves as a memorandum of understanding regarding the directive until a Change Order can be issued. 1.02 Terminology A. The words and terms discussed in this Paragraph 1.02 are not defined, but when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. It is understood that the cost for performing Work is included in the Contract Price and no additional compensation is to be paid by Owner unless specifically stated otherwise in the Contract Documents. Expressions including or similar to "at no additional cost to Owner," "at Contractor's expense," or similar words mean that the Contractor is to perform or provide specified operation of Work without an increase in the Contract Price. C. The terms "day" or "calendar day" mean a calendar day of 24 hours measured from midnight to the next midnight. D. The meaning and intent of certain terms or adjectives are described as follows: 1. The terms "as allowed," "as approved," "as ordered," "as directed," or similar terms in the Contract Documents indicate an exercise of professional judgment by the OPT. 2. Adjectives including or similar to "reasonable," "suitable," "acceptable," "proper," "satisfactory," or similar adjectives are used to describe a determination of OPT regarding the Work. 3. Any exercise of professional judgment by the OPT will be made solely to evaluate the Work for general compliance with the Contract Documents unless there is a specific statement in the Contract Documents indicating otherwise. 4. The use of these or similar terms or adjectives does not assign a duty or give OPT authority to supervise or direct the performance of the Work, or assign a duty or give authority to the OPT to undertake responsibilities contrary to the provisions of Articles 9 or 10 or other provisions of the Contract Documents. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-11 03-23-2015 E. The use of the words "furnish," "install," "perform," and "provide" have the following meanings when used in connection with services, materials, or equipment: 1. Furnish means to supply and deliver the specified services, materials, or equipment to the Site or other specified location ready for use or installation. 2. Install means to complete construction or assembly of the specified services, materials, or equipment so they are ready for their intended use. 3. Perform or provide means to furnish and install specified services, materials, or equipment, complete and ready for their intended use. 4. Perform or provide the specified services, materials, or equipment complete and ready for intended use if the Contract Documents require specific services, materials, or equipment, but do not expressly use the words "furnish," "install," "perform," or "provide." F. Contract Documents are written in modified brief style: 1. Requirements apply to all Work of the same kind, class, and type even though the word "all" is not stated. 2. Simple imperative sentence structure is used which places a verb as the first word in the sentence. It is understood that the words "furnish," "install," "perform," "provide," or similar words include the meaning of the phrase "The Contractor shall..." before these words. 3. Unless specifically stated that action is to be taken by the OPT or others, it is understood that the action described is a requirement of the Contractor. G. Words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with this recognized meaning unless stated otherwise in the Contract Documents. H. Written documents are required where reference is made to notices, reports, approvals, consents, documents, statements, instructions, opinions or other types of communications required by the Contract Documents. Approval and consent documents must be received by Contractor prior to the action or decision for which approval or consent is given. These may be made in printed or electronic format through the OPT's project management information system or other electronic media as required by the Contract Documents or approved by the OAR. I. Giving notice as required by the Contract Documents may be by printed or electronic media using a method that requires acknowledgment of the receipt of that notice. ARTICLE 2 — PRELIMINARY MATTERS 2.01 Delivery of Bonds and Evidence of Insurance A. Provide required Bonds with the executed Agreement. B. Provide evidence of insurance required by the Contract Documents with the executed Agreement. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-12 03-23-2015 2.02 Copies of Documents A. OPT is to furnish one fully executed Agreement and one copy of the executed Contract Documents in electronic portable document format (PDF). This document is the Project Record Copy of the Contract Documents. 2.03 Before Starting Construction A. Provide the following preliminary documents in accordance with the Contract Documents within 10 days after the Effective Date of the Contract: 1. Progress Schedule; 2. Schedule of Documents; and 3. Schedule of Values and projected cash flow information. 2.04 Preconstruction Conference; Designation of Authorized Representatives A. Attend the preconstruction conference as required by the Contract Documents. B. Designate the specific individuals authorized to act as representatives of the Contractor. These individuals must have the authority to transmit and receive information, render decisions relative to the Contract, and otherwise act on behalf of the Contractor. C. Owner is to designate the specific individuals authorized to act as representatives of the Owner and the limits of their authority with regard to acting on behalf of the Owner. ARTICLE 3 — CONTRACT DOCUMENTS: INTENT, REQUIREMENTS, REUSE 3.01 Intent A. Requirements of components of the Contract Documents are as binding as if required by all Contract Documents. It is the intent of the Contract Documents to describe a functionally complete Project. The Contract Documents do not indicate or describe all of the Work required to complete the Project. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the OPT. 1. The Contract requirements described in the General Conditions, Supplementary Conditions, and General Requirements (Division 01 Sections of the Specifications) apply to Work regardless of where it is described in the Contract Documents, unless specifically noted otherwise. 2. In offering a Bid for this Project and in entering into this Contract, Contractor represents: a. Contractor has studied the Contract Documents, the Work, the Site, local conditions, Laws and Regulations, and other conditions that may affect the Work; b. Contractor has studied the Technical Data and other information referred to in the Contract Documents and has or will make additional surveys and investigations as deemed necessary for the performance of the Work; c. Contractor has correlated these studies and observations with the requirements of the Contract Documents; and General Conditions Corpus Christi Standards - Regular Projects 00 72 00-13 03-23-2015 d. Contractor has taken all of this information into consideration in developing the Contract Price offered and that the Contract Price offered provides full compensation for providing the Work in accordance with the Contract Documents. 3. Organization of the Contract Documents is not intended to control or lessen the responsibility of the Contractor when dividing Work among Subcontractors or Suppliers, or to establish the extent of Work to be performed by trades, Subcontractors, or Suppliers. Specifications or details do not need to be indicated or specified in each Specification or Drawing. Items shown in the Contract Documents are applicable regardless of their location in the Contract Documents. 4. Standard paragraph titles and other identifications of subject matter in the Specifications are intended to aid in locating and recognizing various requirements of the Specifications. Titles do not define, limit, or otherwise restrict Specification text. 5. Provide the labor, documentation, services, materials, or equipment that may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result, whether specifically called for in the Contract Documents or not. Include these related costs in the offered Contract Price. B. Provide equipment that is functionally complete as described in the Contract Documents. The Drawings and Specifications do not indicate or describe all of the Work required to complete the installation of products purchased by the Owner or Contractor. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the Designer through the OAR. C. Comply with the most stringent requirements where compliance with two or more standards is specified and they establish different or conflicting requirements for the Work, unless the Contract Documents indicate otherwise. D. Provide materials and equipment comparable in quality to similar materials and equipment incorporated in the Project or as required to meet the minimum requirements of the application if the materials and equipment are shown in the Drawings but are not included in the Specifications. E. The Project Record Copy of the Contract Documents governs if there is a discrepancy between the Project Record Copy of the Contract Documents and subsequent electronic or digital versions of the Contract Documents, including printed copies derived from these electronic or digital versions. F. The Contract supersedes all prior written or oral negotiations, representations, and agreements. The Contract Documents comprise the entire Agreement between Owner and Contractor. The Contract Documents may be modified only by a Modification. G. Request clarification from OAR for a decision before proceeding if Contractor is riot clear on the meaning of the Contract Documents. OAR is to issue clarifications and interpretations of the Contract Documents in accordance with the Contract Documents. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-14 03-23-2015 3.02 Reference Standards A. Standard Specifications, Codes, Laws and Regulations: 1. Reference in the Contract Documents to standard specifications, manuals, reference standards, or codes of technical societies, organizations, or associations, or to Laws or Regulations, whether specific or implied, are those in effect at the time Contractor's Bid is submitted or when Contractor negotiates the Contract Price unless specifically stated otherwise in the Contract Documents. 2. No provision of referenced standard specifications, manuals, reference standards, codes, or instructions of a Supplier changes the duties or responsibilities of OPT or Contractor from those described in the Contract Documents or assigns a duty to or gives authority to the OPT to supervise or direct the performance of the Work or undertake responsibilities inconsistent with the Contract Documents. 3. The provisions of the Contract Documents take precedence over standard specifications, manuals, reference standards, codes, or instructions of a Supplier unless specifically stated otherwise in the Contract Documents. B. Comply with applicable construction industry standards, whether referenced or not. 1. Standards referenced in the Contract Documents govern over standards not referenced but recognized as applicable in the construction industry. 2. Comply with the requirements of the Contract Documents if they produce a higher quality of Work than the applicable construction industry standards. 3. Designer determines whether a code or standard is applicable, which of several are applicable, or if the Contract Documents produce a higher quality of Work. C. Make copies of reference standards available if requested by OAR. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: 1. Carefully study the Drawings and verify pertinent figures and dimensions with respect to actual field measurements before undertaking the Work. Immediately report conflicts, errors, ambiguities, or discrepancies that Contractor discovers or has actual knowledge of to the OAR. Do not proceed with affected Work until the conflict, error, ambiguity, or discrepancy is resolved by a clarification or interpretation from the OAR or by a Modification to the Contract Documents issued pursuant to Paragraph 11.01. 2. Immediately notify the OAR of conflicts, errors, ambiguities, or discrepancies in the Contract Documents or discrepancies between the Contract Documents and: a. Applicable Laws or Regulations; b. Actual field conditions; c. Standard specifications, manuals, reference standards, or codes; or d. Instructions of Suppliers. 3. Do not proceed with affected Work until the conflict, error, ambiguity, or discrepancy is resolved by a clarification or interpretation from the OAR or by a Modification to the General Conditions Corpus Christi Standards - Regular Projects 00 72 00-15 03-23-2015 Contract Documents issued pursuant to Paragraph 11.01, except in an emergency as required by Paragraph 7.12. 4. Contractor is liable to the OPT for failure to report conflicts, errors, ambiguities, or discrepancies in the Contract Documents of which Contractor has actual knowledge. 5. Contractor is deemed to have included the most expensive item, system, procedure, etc. in the Contract Price if a conflict, error, ambiguity, or discrepancy in components of the Contract Documents was known, but not reported prior to submitting the Bid or when Contractor negotiates the Contract Price. 3.04 Interpretation of the Contract Documents A. Submit questions concerning the non-technical or contractual / administrative requirements of the Contract Documents to the OAR immediately after those questions arise. OAR is to provide an interpretation of the Contract Documents regarding these questions and will coordinate the response of the OPT to Contractor. B. Submit questions regarding the design of the Project described in the Contract Documents to the OAR immediately after those questions arise. OAR is to request an interpretation of the Contract Documents from the Designer. Designer is to respond to these questions by providing an interpretation of the Contract Documents. OAR will coordinate the response of the OPT to Contractor. C. OPT may initiate a Modification to the Contract Documents through the OAR if a response to the question indicates that a change in the Contract Documents is required. Contractor may appeal Designer's or OAR's interpretation by submitting a Change Proposal. 3.05 Reuse of Documents A. Contractor's Team has no rights to the Contract Documents and may not use the Contract Documents, or copies or electronic media editions of the Contract Documents, other than for the construction of this Project. This provision survives final payment or termination of the Contract. B. Contractor is allowed to retain a copy of the Contract Documents for record purposes, unless specifically prohibited by the Owner for security reasons. Surrender paper and digital copies of the Contract Documents and other related documents and remove these documents from computer equipment or storage devices as a condition of final payment if the Owner so directs. ARTICLE 4 — COMMENCEMENT AND PROGRESS OF THE WORK 4.01 Commencement of Contract Times; Notice to Proceed A. The Contract Times commence to run on the date indicated in the Notice to Proceed. 4.02 Starting the Work A. Begin performing the Work on the date indicated in the Notice to Proceed. Do not begin Work prior to having the insurance required in Article 6 in force or before the date indicated in the Notice to Proceed. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-16 03-23-2015 4.03 Progress Schedule A. Construct the Work in accordance with the Progress Schedule established in accordance with the Contract Documents. 1. Adjust the Progress Schedule as required to accurately reflect actual progress on the Work. 2. Submit proposed adjustments in the Progress Schedule that change the Contract Times in accordance with the requirements of Article 11. B. Continue performing Work and adhere to the Progress Schedule during disputes or disagreements with Owner. Do not delay or postpone Work pending resolution of disputes or disagreements, or during an appeal process, except as permitted by Paragraph 16.04, or as Owner and Contractor may otherwise agree. 4.04 Delays in Contractor's Progress A. Contractor is entitled to an equitable adjustment in the Contract Times if OPT directly delays, disrupts, or interferes with the performance or progress of the Work. The Contractor agrees to make no Claim for damages for delay in the performance of the Contract occasioned by an act or omission to act of the OPT and agrees that the extension of time provides an equitable adjustment. B. Contractor is not entitled to an adjustment in Contract Price or Contract Times for delays, disruptions, or interference caused by or within the control of Contractor's Team. C. No time extensions are allowed for weather conditions, other than those listed in Paragraph 4.04.D.1, for Projects using calendar days or a fixed date to establish the Contract Time. Contractor is to include the cost associated with weather related delays in the Contract Price and assumes the risks associated with delays related to weather conditions. D. Contractor is entitled to an equitable adjustment in the Contract Times if Contractor's performance or progress is delayed, disrupted, or interfered with by unanticipated causes not the fault of and beyond the control of OPT or Contractor. These unanticipated causes may include: 1. Severe and unavoidable natural catastrophes e.g. fires, floods, hurricanes, epidemics, and earthquakes; 2. Acts or failures to act of utility owners other than those performing other work at or adjacent to the Site by arrangement with the Owner, as contemplated in Article 8; and 3. Acts of war or terrorism. 4. Rain days in excess of the number of days allocated for rain as described in the Supplementary Conditions. E. Delays, disruption, and interference to the performance or progress of the Work resulting from the following are governed by Article 5: 1. The existence of a differing subsurface or physical condition; 2. An Underground Facility not shown or not indicated with reasonable accuracy by the Contract Documents; and General Conditions Corpus Christi Standards - Regular Projects 00 72 00-17 03-23-2015 3. Hazardous Environmental Conditions. These adjustments in Contract Times are the Contractor's sole and exclusive remedy for the delays, disruption, and interference described in this paragraph. F. Article 8 governs delays, disruption, and interference to the performance or progress of the Work resulting from the performance of certain other work at or adjacent to the Site. G. Notify the OAR immediately of a potential delaying, disrupting, or interfering event. Submit a Change Proposal seeking an adjustment in Contract Price or Contract Times within 30 days of the commencement of the delaying, disrupting, or interfering event. H. Contractor is only entitled to an adjustment of the Contract Times for specific delays, disruptions, and interference to the performance or progress of the Work that can be demonstrated to directly impact the ability of the Contractor to complete the Work within the Contract Times. No adjustments in Contract Times are allowed for delays on components of the Work which were or could have been completed without impacting the Contract Times. I. Contractor is not entitled to an adjustment in Contract Price or Contract Times for delay, disruption, or interference caused by or within the control of the Owner if this delay is concurrent with a delay, disruption, or interference attributable to or within the control of the Contractor's Team. ARTICLE 5 —AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS 5.01 Availability of Lands A. Owner is to furnish the Site and inform the Contractor of encumbrances or restrictions known to Owner related to use of the Site with which Contractor must comply in performing the Work. B. Provide for additional lands and access Contractor requires for temporary construction facilities or storage of materials and equipment, other than those identified in the Contract Documents. Provide documentation of authority to use these additional lands to OAR before using them. 5.02 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Confine construction equipment, temporary construction facilities, the storage of materials and equipment, and the operations of workers to the Site, adjacent areas that Owner or Contractor has arranged to use through construction easements or agreements, and other adjacent areas as permitted by Laws and Regulations. Assume full responsibility for damage or injuries which result from the performance of the Work or from other actions or conduct of the Contractor's Team, including: a. Damage to the Site; b. Damage to adjacent areas used for Contractor's Team's operations; c. Damage to other adjacent land or areas; and General Conditions Corpus Christi Standards - Regular Projects 00 72 00-18 03-23-2015 d. Injuries and losses sustained by the owners or occupants of these lands or areas. 2. Take the following action if a damage or injury claim is made by the owner or occupant of adjacent land or area because of the performance of the Work, or because of other actions or conduct of the Contractor's Team: a. Take immediate corrective or remedial action as required by Paragraph 7.09; and b. Attempt to settle the claim through negotiations with the owner or occupant, or otherwise resolve the claim by mediation or other dispute resolution proceeding or at law. 5.03 Subsurface and Physical Conditions A. The Supplementary Conditions identify: 1. Those reports known to OPT of explorations and tests of subsurface conditions at or adjacent to the Site; 2. Those drawings known to OPT of physical conditions related to existing surface or subsurface structures at the Site, except Underground Facilities; and 3. Technical Data contained in these reports and drawings. B. Data contained in boring logs, recorded measurements of subsurface water levels, and the results of tests performed on materials described in geotechnical data reports specifically prepared for the Project and made available to Contractor are defined as Technical Data, unless Technical Data has been defined more specifically in the Supplementary Conditions. C. Contractor may rely upon the accuracy of the Technical Data contained in these reports and drawings, but these reports and drawings are not Contract Documents. Except for this reliance on Technical Data, Contractor may not rely upon or make claims against Owner's Indemnitees with respect to: 1. The completeness of reports and drawings for Contractor's purposes, including aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, or Contractor's safety precautions and programs; 2. Other data, interpretations, opinions, and information contained in these reports or shown or indicated in the drawings; or 3. Contractor's interpretation of or conclusions drawn from Technical Data or other data, interpretations, opinions, or information. 5.04 Differing Subsurface or Physical Conditions A. Notify OAR immediately, but in no event later than 3 days, after becoming aware of a subsurface or physical condition that is uncovered or revealed at the Site, and before further disturbing the subsurface or physical conditions or performing any related Work that: 1. Establishes that the Technical Data on which Contractor is entitled to rely as provided in Paragraph 5.03 is materially inaccurate; 2. Requires a change in the Drawings or Specifications; 3. Differs materially from that shown or indicated in the Contract Documents; or General Conditions Corpus Christi Standards - Regular Projects 00 72 00-19 03-23-2015 4. Is of an unusual nature and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents. Do not further disturb or perform Work related to this subsurface or physical condition, except in an emergency as required by Paragraph 7.12, until permission to do so is issued by OAR. B. OAR is to notify the OPT after receiving notice of a differing subsurface or physical condition from the Contractor. Designer is to: 1. Promptly review the subsurface or physical condition; 2. Determine the necessity of OPT's obtaining additional exploration or tests with respect the subsurface or physical condition; 3. Determine if the subsurface or physical condition falls within one or more of the differing Site condition categories in Paragraph 5.04.A; 4. Prepare recommendations to OPT regarding the Contractor's resumption of Work in connection with the subsurface or physical condition in question; 5. Determine the need for changes in the Drawings or Specifications; and 6. Advise OPT of Designer's findings, conclusions, and recommendations. C. OAR is to issue a statement to Contractor regarding the subsurface or physical condition in question and recommend action as appropriate after review of Designer's findings, conclusions, and recommendations. D. Possible Contract Price and Contract Times Adjustments: 1. Contractor is entitled to an equitable adjustment in Contract Price or Contract Times to the extent that a differing subsurface or physical condition causes a change in Contractor's cost or time to perform the Work provided the condition falls within one or more of the categories described in Paragraph 5.04.A. Any adjustment in Contract Price for Work that is paid for on a unit price basis is subject to the provisions of Paragraph 13.03. 2. Contractor is not entitled to an adjustment in the Contract Price or Contract Times with respect to a subsurface or physical condition if: a. Contractor knew of the existence of the subsurface or physical condition at the time Contractor made an offer to Owner with respect to Contract Price and Contract Times; b. The existence of the subsurface or physical condition could have been discovered or revealed as a result of examinations, investigations, explorations, tests, or studies of the Site and contiguous areas expressly required by the Bidding Requirements or Contract Documents prior to when Contractor's Bid is submitted or when Contractor negotiates the Contract Price; or c. Contractor failed to give notice as required by Paragraph 5.04.A. 3. Contractor may submit a Change Proposal no later than 30 days after OAR's issuance of the OPT's statement to Contractor regarding the subsurface or physical condition in question. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-20 03-23-2015 4. A Change Order is to be issued by the OAR if Owner and Contractor agree that Contractor is entitled to an adjustment in the Contract Price or Contract Times and agree to the amount or extent of adjustments in the Contract. Price or Contract Times. 5.05 Underground Facilities A. The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or adjacent to the Site is based on information and data furnished to OPT by the owners of these Underground Facilities or by others. OPT is not responsible for the accuracy or completeness of information or data provided by others that OPT makes available to Contractor. The Contractor is responsible for: 1. Reviewing and checking available information and data regarding existing Underground Facilities at the Site; 2. Complying with Laws and Regulations related to locating Underground Facilities before beginning Work; 3. Locating Underground Facilities shown or indicated in the Contract Documents; 4. Coordinating the Work with the owners, including Owner, of Underground Facilities during construction; and 5. The safety and protection of existing Underground Facilities at or adjacent to the Site and repairing damage resulting from the Work. B. Notify the OAR and the owner of the Underground Facility immediately if an Underground Facility is uncovered or revealed at the Site that was not shown in the Contract Documents, or was not shown with reasonable accuracy in the Contract Documents. Do not further disturb conditions or perform Work affected by this discovery, except in the event of an emergency as required by Paragraph 7.12. C. The Designer is to take the following action after receiving notice from the OAR: 1. Promptly review the Underground Facility and conclude whether the Underground Facility was not shown or indicated in the Contract Documents, or was not shown or indicated with reasonable accuracy; 2. Prepare recommendations to OPT regarding the Contractor's resumption of Work in connection with this Underground Facility; 3. Determine the extent to which a change is required in the Drawings or Specifications to document the consequences of the existence or location of the Underground Facility; and 4. Advise OAR of Designer's findings, conclusions, and recommendations and provide revised Drawings and Specifications if required. D. OAR is to issue a statement to Contractor regarding the Underground Facility in question and recommend action as appropriate after review of Designer's findings, conclusions, and recommendations. E. Contractor is entitled to an equitable adjustment in the Contract Price or Contract Times as provided in Paragraphs 11.04 and 11.05 to the extent that the existing Underground Facility at the Site that was not shown or indicated in the Contract. Documents, or was not shown General Conditions Corpus Christi Standards - Regular Projects 00 72 00-21 03-23-2015 or indicated with reasonable accuracy. Any adjustment in Contract Price for Work that is paid for on a unit price basis is subject to the provisions of Paragraph 13.03. F. Contractor is not entitled an adjustment in the Contract Price or Contract Times with respect to an existing Underground Facility at the Site if: 1. Contractor knew of the existence of the existing Underground Facility at the Site at the time Contractor made an offer to Owner with respect to Contract Price and Contract Times; 2. The existence of the existing Underground Facility at the Site could have been discovered or revealed as a result of examinations, investigations, explorations, tests, or studies of the Site and contiguous areas expressly required by the Bidding Requirements or Contract Documents prior to when Contractor's Bid is submitted or when Contractor negotiates the Contract Price; or 3. Contractor failed to give notice as required by Paragraph 5.05.B. G. Contractor may submit a Change Proposal regarding its entitlement to or the amount or extent of adjustments in the Contract Price or Contract Times no later than 30 days after OAR's issuance of OPT's statement to Contractor regarding the Underground Facility. 5.06 Hazardous Environmental Conditions at Site A. The Supplementary Conditions identify: 1. Those reports and drawings known to OPT relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site; and 2. Technical Data contained in these reports and drawings. B. Contractor may rely upon the accuracy of the Technical Data contained in reports and drawings relating to Hazardous Environmental Conditions identified in the Supplementary Conditions, but these reports and drawings are not Contract Documents. Except for the reliance on expressly identified Technical Data, Contractor may not rely upon or make claims against Owner's Indemnitees with respect to: 1. The completeness of these reports and drawings for Contractor's purposes, including aspects of the means, methods, techniques, sequences and procedures of construction to be employed by Contractor or Contractor's safety precautions and programs related to Hazardous Environmental Conditions; 2. Other data, interpretations, opinions, and information contained in these reports or shown or indicated in the drawings; or 3. Any Contractor interpretation of or conclusion drawn from Technical Data or other data, interpretations, opinions, or information. C. The results of tests performed on materials described in environmental reports specifically prepared for the Project and made available to Contractor are defined as Technical Data unless Technical Data has been defined more specifically in the Supplementary Conditions. D. Contractor is not responsible for removing or remediating Hazardous Environmental Conditions encountered, uncovered, or revealed at the Site unless this removal or General Conditions Corpus Christi Standards - Regular Projects 00 72 00-22 03-23-2015 remediation is expressly identified in the Contract Documents to be within the scope of the Work. E. Contractor is responsible for controlling, containing, and duly removing and remediating Constituents of Concern brought to the Site by Contractor's Team and paying associated costs. 1. Owner may remove and remediate the Hazardous Environmental Condition and impose a set-off against payments to Contractor for associated costs if Contractor's Team creates a Hazardous Environmental Condition and Contractor does not take acceptable action to remove and remediate the Hazardous Environmental Condition. 2. Contractor's obligation to indemnify Owner's Indemnitees for claims arising out of or related to Hazardous Environmental Conditions are as set forth in Paragraph 7.14. F. Immediately notify the OAR and take the following action if Contractor uncovers or reveals a Hazardous Environmental Condition at the Site or adjacent areas used by the Contractor's Team that was not created by the Contractor's Team: 1. Secure or otherwise isolate this condition; 2. Stop Work in affected areas or connected with the condition, except in an emergency as required by Paragraph 7.12; and 3. Do not resume Work in connection with the Hazardous Environmental Condition or in affected areas until after OPT has obtained required permits and OAR sends notice to the Contractor: a. Specifying that this condition and affected areas are or have been rendered safe for the resumption of Work; or b. Specifying special conditions under which Work may be resumed safely. 4. Owner may order the portion of the Work that is in the area affected by the Hazardous Environmental Condition to be deleted from the Work following the procedures in Article 11 if Contractor does not agree to: a. Resume the Work based on a reasonable belief it is unsafe; or b. Resume the Work under the special conditions provided by the OAR. 5. Owner may have this deleted portion of the Work performed by Owner's own forces or others in accordance with Article 8. G. Contractor may submit a Change Proposal or Owner may impose a set-off if an agreement is not reached within 10 days of OAR's notice regarding the resumption of Work as to whether Contractor is entitled to an adjustment in Contract Price or Contract Times or on the amount or extent of adjustments resulting from this Work stoppage or special conditions under which Contractor agrees to resume Work. H. The provisions of Paragraphs 5.03, 5.04, and 5.05 do not apply to the presence of Constituents of Concern or a Hazardous Environmental Condition uncovered or revealed at the Site. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-23 03-23-2015 ARTICLE 6 — BONDS AND INSURANCE 6.01 Performance, Payment, and Other Bonds A. Furnish Performance and Payment Bonds, each in an amount equal to the Contract Price, as security for the faithful performance and payment of Contractor's obligations under the Contract Documents. These Bonds are to remain in effect until 1 year after the date of final payment. Furnish other Bonds as required by the Contract Documents. B. Bonds furnished by the Contractor must meet the requirements of Texas Insurance Code Chapter 3503, Texas Government Code Chapter 2253, and all other applicable Laws and Regulations. C. Notify OAR immediately if the surety on Bonds furnished by Contractor: 1. Is declared bankrupt, or becomes insolvent; 2. Has its right to do business in Texas terminated; or 3. Ceases to meet the requirements of Paragraph 6.02. Provide a Bond and surety which comply with the requirements of Paragraph 6.02 within 20 days after the event giving rise to this notification. D. Contractor is to use amounts paid by Owner to Contractor under the Contract for the performance of the Contract and to satisfy claims against the Payment Bond. E. Notify the OAR of claims filed against the Payment Bond. Notify the claimant and OAR of undisputed amounts and the basis for challenging disputed amounts when a claimant has satisfied the conditions prescribed by Texas Government Code Chapter 2253. Promptly pay undisputed amount. F. Owner is not liable for payment of costs or expenses of claimants under the Payment Bond. Owner has no obligations to pay, give notice, or take other action to claimants under the Payment Bond. G. Owner may exclude the Contractor from the Site and exercise Owner's termination rights under Article 16 if Contractor fails to obtain or maintain required Bonds. H. OPT will provide a copy of the Payment Bond to Subcontractors, Suppliers, or other persons or entities claiming to have furnished labor or materials used in the performance of the Work that request this information in accordance with Texas Government Code Chapter 2253. 6.02 Licensed Sureties A. Provide Bonds in the form prescribed by the Contract Documents from sureties named in the list of "Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. B. Provide Bonds required by the Contract Documents from surety companies that are duly licensed or authorized to provide bonds in the State of Texas. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-24 03-23-2015 6.03 Insurance A. Obtain and maintain insurance as required in this Article and in SECTION 00 72 01 INSURANCE REQUIREMENTS. B. Deliver evidence of insurance in accordance with SECTION 00 72 01 INSURANCE REQUIREMENTS to the Owner to demonstrate that Contractor has obtained and is maintaining the policies, coverages, and endorsements required by the Contract. Provide copies of these certificates to each named insured and additional insured as identified in the Supplementary Conditions or otherwise. ARTICLE 7 — CONTRACTOR'S RESPONSIBILITIES 7.01 Supervision and Superintendence A. Supervise, inspect, and direct the performance of the Work in accordance with the Contract Documents. Contractor is solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. Provide a competent resident superintendent acceptable to the OPT. The resident superintendent or acceptable qualified assistant is to be present at all times when Work is being done. Do not replace this resident superintendent except under extraordinary circumstances. Provide a replacement resident superintendent equally competent to the previous resident superintendent if replacement is required. Notify the Owner prior to replacing the resident superintendent and obtain Owner's consent to the change in superintendent. 7.02 Labor; Working Hours A. Provide competent, suitably qualified personnel to survey and lay out the Work and perform Work to complete the Project. Maintain good discipline and order at the Site. B. Perform Work at the Site during regular working hours except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent to the Site and except as otherwise stated in the Contract Documents. C. Do not perform Work on a Saturday, Sunday, or legal holiday without OAR's consent. The following legal holidays are observed by the Owner: Holiday Date Observed New Year's Day January 1 Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Thanksgiving Day Fourth Thursday in November Friday after Thanksgiving Friday after Thanksgiving Christmas Day December 25 General Conditions Corpus Christi Standards - Regular Projects 00 72 00-25 03-23-2015 D. If a legal holiday falls on a Saturday, it will be observed the preceding Friday. If a legal holiday falls on a Sunday, it will be observed the following Monday. E. Pay additional cost incurred by Owner for services of the OAR or RPR to observe Work constructed outside of regular working hours. OAR will issue a Set-off in the Application for Payment for this cost per Paragraph 15.01.8 7.03 Services, Materials, and Equipment A. Provide services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and other facilities and incidentals necessary for the performance, testing, start-up, and completion of the Work, whether or not these items are specifically called for in the Contract Documents. B. Provide new materials and equipment to be incorporated into the Work. Provide special warranties and guarantees required by the Contract Document. Provide satisfactory evidence, including reports of required tests, as to the source, kind, and quality of materials and equipment as required by the Contract Documents or as requested by the OAR. C. Store, apply, install, connect, erect, protect, use, clean, and condition materials and equipment in accordance with instructions of the applicable Supplier, unless otherwise required by the Contract Documents. 7.04 Concerning Subcontractors, Suppliers, and Others A. Contractor may retain Subcontractors and Suppliers for the performance of parts of the Work. All Subcontractors and Suppliers must be acceptable to Owner. B. Contractor must retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of designated parts of the Work if required to do so by the Contract Documents. C. Submit a list of proposed Subcontractors and Suppliers to OAR prior to entering into binding subcontracts or purchase orders. These proposed Subcontractors or Suppliers are deemed acceptable to Owner unless Owner raises a substantive, reasonable objection within 30 days after receiving this list. D. Contractor is not required to retain Subcontractors, Suppliers, or other individuals or entities to furnish or perform part of the Work after the Effective Date of the Contract if Contractor has reasonable objection. E. Owner may require the replacement of Subcontractors, Suppliers, or other individuals or entities retained by the Contractor. Provide an acceptable replacement for the rejected Subcontractor, Supplier, or other individual or entity. Owner also may require Contractor to retain specific replacements, subject to Contractor's reasonable objections. F. Contractor may be entitled to an adjustment in Contract Price or Contract Times with respect to a replacement of Subcontractors, Suppliers, or other entities required by Owner. The Contractor is not entitled to an adjustment in Contract Price or Contract Time with respect to replacement of any individual deemed unsuitable by the OPT. Notify OAR immediately if a replacement of Subcontractors, Suppliers, or other entity increases the Contract Price or Contract Times. Initiate a Change Proposal for the adjustment within 10 General Conditions Corpus Christi Standards - Regular Projects 00 72 00-26 03-23-2015 days of Owner's notice to replace a Subcontractor, Supplier, or other entity retained by Contractor to perform part of the Work. Do not make the replacement until the change in Contract Price or Contract Times has been accepted by the Owner if Change Proposal is to be submitted. G. Owner's initial acceptance of Subcontractors, Suppliers, or other individuals or entities, or their replacements, does not constitute a waiver of the obligation of the Contractor to complete the Work in accordance with the Contract Documents. H. Maintain a current and complete list of Subcontractors and Suppliers that are to perform or furnish part of the Work. I. Contractor is fully responsible for the acts and omissions of Subcontractors, Suppliers, and other individuals or entities performing or furnishing Work. J. Contractor is solely responsible for scheduling and coordinating the work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing Work. K. Require Subcontractors, Suppliers, and other individuals or entities performing or furnishing Work to communicate with OPT through Contractor. L. Contracts between the Contractor and their Subcontractors or Suppliers may specifically bind the Subcontractors or Suppliers to the applicable terms and conditions of the Contract Documents. Contractor is responsible for meeting the requirements of the Contract Documents if they choose to not bind the Subcontractors or Suppliers to applicable terms or conditions of the Contract Documents. 1. All Subcontractors employed on this Project must be required to obtain Workers' Compensation Insurance. 2. Proof of this insurance will be required prior to the start of any Work. M. OPT may furnish information about amounts paid to Contractor for Work provided by Subcontractors or Suppliers to the entity providing the Work. N. Nothing in the Contract Documents: 1. Creates a contractual relationship between members of the OPT and members of the Contractor's Team. 2. Creates an obligation on the part of the Owner to pay or to see to the payment of money due members of the Contractor's Team, except as may be required by Laws and Regulations. 7.05 Patent Fees and Royalties A. Pay license fees, royalties, and costs incident to the use of inventions, designs, processes, products, or devices which are patented or copyrighted by others in the performance of the Work, or to incorporate these inventions, designs, processes, products, or devices which are patented or copyrighted by others in the Work. The Contract Documents identify inventions, designs, processes, products, or devices OPT knows are patented or copyrighted by others or that its use is subject to patent rights or copyrights calling for the payment of a license fee or royalty to others. Contractor is to include the cost associated with the use of patented or copyrighted products or processes, whether specified or selected by the Contractor, in the Contract Price. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-27 03-23-2015 B. Contractor's obligation to indemnify Owner's Indemnitees for claims arising out of or related to infringement of patent rights and copyrights are as set forth in Paragraph 7.14. 7.06 Permits A. Obtain and pay for construction permits and licenses. OPT is to assist Contractor in obtaining permits and licenses when required to do so by applicable Laws and Regulations. Pay governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time the Contractor's Bid is submitted or when Contractor negotiates the Contract Price. 7.07 Taxes A. Contractor is responsible for all taxes and duties arising out of the Work. The Owner generally qualifies as a tax exempt agency as defined by the statutes of the State of Texas and is usually not subject to any city or state sales or use taxes, however certain items such as rented equipment may be taxable even though Owner is a tax-exempt agency. Contractor is responsible for including in the Contract Price any applicable sales and use taxes and is responsible for complying with all applicable statutes and rulings of the State Comptroller. Pay sales, consumer, use, and other similar taxes required to be paid by Contractor in accordance with the Laws and Regulations. B. The Owner is exempt from the Federal Transportation and Excise Tax. Contractor must comply with all federal regulations governing the exemptions. C. Products incorporated into the Work are exempt from state sales tax according to the provisions of Subchapter H, Chapter 151, of the Texas Tax Code. D. Contractor may not include any amounts for sales, use, or similar taxes for which the Owner is exempt in the Contract Price or any proposed Change Order or Application for Payment. E. Obtain tax exemption certificates or other documentation necessary to establish Owner's exemption from such taxes. 7.08 Laws and Regulations A. Give required notices and comply with Laws and Regulations applicable to the performance of the Work. OPT is not responsible for monitoring Contractor's compliance with Laws or Regulations except where expressly required by applicable Laws and Regulations. B. Pay costs resulting from actions taken by Contractor that are contrary to Laws or Regulations. Contractor is not responsible for determining that the design aspects of the Work described in the Contract Documents is in accordance with Laws and Regulations. This does not relieve Contractor of its obligations under Paragraph 3.03. C. Owner or Contractor may give notice to the other party of changes in Laws or Regulations that may affect the cost or time of performance of the Work, including: 1. Changes in Laws or Regulations affecting procurement of permits; and 2. Sales, use, value-added, consumption, and other similar taxes which come into effect after Contractor's Bid is submitted or when Contractor negotiates the Contract Price. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-28 03-23-2015 D. Contractor may submit a Change Proposal or Owner may initiate a Claim within 30 days of this notice if Owner and Contractor are unable to agree on entitlement to or on the amount or extent of adjustments in Contract Price or Contract. Times resulting from these changes. 7.09 Safety and Protection A. Contractor is solely responsible for initiating, maintaining, and supervising safety precautions and programs in connection with the Work. This responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. B. Take necessary precautions for the safety of persons on the Site or who may be affected by the Work, and provide the necessary protection to prevent damage, injury, or loss to: 1. Work and materials and equipment to be incorporated in the Work, whether stored on or off Site; and 2. Other property at or adjacent to the Site, including trees, shrubs, lawns, walks, pavements, roadways, structures, other work in progress, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. C. Comply with applicable Laws and Regulations relating to the safety and protection of persons or property. Erect and maintain necessary safeguards for safety and protection. Notify Owner; the owners of adjacent property, Underground Facilities, and other utilities; and other contractors and utility owners performing work at or adjacent to the Site when prosecution of the Work may affect them. Cooperate with them in the protection, removal, relocation, and replacement of their property or work in progress. 1. Comply with requirements of Underground Facility Damage Prevention and Safety Act, Texas Utilities Code Chapter 251. 2. Comply with all applicable safety rules and regulations of the Federal Occupational Health and Safety Act of 1970 and subsequent amendments (OSHA). D. Remedy damage, injury, or loss to property referred to in Paragraph 7.09.6 caused by Contractor's Team. Pay remediation costs unless the damage or loss is: 1. Attributable to the fault of the Contract Documents; 2. Attributable to acts or omissions of OPT; or 3. Not attributable to the actions or failure to act of the Contractor's Team. E. Contractor's duties and responsibilities for safety and protection of persons or the Work or property at or adjacent to the Site continues until Work is completed and resumes whenever Contractor's Team returns to the Site to fulfill warranty or correction obligations or to conduct other tasks. F. Comply with the applicable requirements of the Owner's safety program if required to do so in the Supplementary Conditions. A copy of the Owner's safety program will be provided in the Bidding Documents. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-29 03-23-2015 7.10 Safety Representative A. Provide a qualified and experienced safety representative at the Site whose duties and responsibilities are the prevention of accidents and maintaining and supervising safety programs. 7.11 Hazard Communication Programs A. Coordinate the exchange of material safety data sheets or other hazard communication information required to be made available or exchanged between or among employers at the Site in accordance with Laws or Regulations. 7.12 Emergencies A. Act to prevent threatened damage, injury, or loss in emergencies affecting the safety or protection of persons or the Work or property at or adjacent to the Site. Notify OAR immediately if Contractor believes that significant changes in the Work or variations from the Contract. Documents have been caused or are required as a result of this need to act. A Modification is to be issued by OAR if OPT determines that the incident giving rise to the emergency action was not the responsibility of the Contractor and that a change in the Contract Documents is required because of the action taken by Contractor in response to this emergency. 7.13 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to Owner that Work is in accordance with the Contract Documents and is not Defective. Owner is entitled to rely on Contractor's warranty and guarantee. Assume and bear responsibility for costs and time delays associated with variations from the requirements of the Contract Documents. B. This Contractor's warranty and guarantee excludes defects or damage caused by improper maintenance or operation, abuse, or modification by OPT; or normal wear and tear under normal usage. C. Contractor's obligation to perform and complete Work in accordance with the Contract Documents is absolute. None of the following constitute an acceptance of Defective Work or a release of Contractor's obligation to perform Work in accordance with the Contract Documents: 1. Observations by OPT; 2. Recommendation by OAR or payment by Owner of progress or final payments; 3. The issuance of a Certificate of Substantial Completion; 4. Use or occupancy of part of the Work by Owner; 5. Review and approval of a Shop Drawing or Sample; 6. Inspections, tests, or approvals by others; or 7. Correction of Defective Work by Owner. D. The Contract Documents may require the Contractor to accept the assignment of a contract between the Owner and a contractor or supplier. The specific warranties, guarantees, and General Conditions Corpus Christi Standards - Regular Projects 00 72 00-30 03-23-2015 correction obligations contained in an assigned contract govern with respect to Contractor's performance obligations to Owner for the Work described in an assigned contract. 7.14 Indemnification A. To THE FULLEST EXTENT PERMITTED BY LAW, THE CONTRACTOR SHALL INDEMNIFY, DEFEND, AND HOLD HARMLESS THE OWNER'S INDEMNITEES FROM AND AGAINST CLAIMS, DAMAGES, LOSSES AND EXPENSES, INCLUDING BUT NOT LIMITED TO ATTORNEY'S FEES OR DISPUTE RESOLUTION COSTS, ARISING OUT OF OR RESULTING FROM PERFORMANCE OF THE WORK, VIOLATIONS OF LAWS OR REGULATIONS, OR BODILY INJURY, DEATH, OR DESTRUCTION OF TANGIBLE PROPERTY CAUSED BY THE ACTS OR OMISSIONS OF THE CONTRACTOR'S TEAM, REGARDLESS OF WHETHER SUCH CLAIM, DAMAGE, LOSS OR EXPENSE IS ALLEGED TO BE CAUSED IN PART BY AN OWNER'S INDEMNITEE HEREUNDER, SUBJECT TO THE OWNER'S DEFENSES AND LIABILITY LIMITS UNDER THE TEXAS TORT CLAIMS ACT. HOWEVER, NOTHING HEREIN SHALL BE CONSTRUED TO REQUIRE CONTRACTOR TO INDEMNIFY AN OWNER'S INDEMNITEE AGAINST A CLAIM, LOSS, DAMAGE OR EXPENSE CAUSED BY THE (I) NEGLIGENCE OR FAULT, (II) BREACH OR VIOLATION OF A STATUTE, ORDINANCE, GOVERNMENTAL REGULATION, STANDARD OR RULE, OR (III) THE BREACH OF CONTRACT BY AN OWNER'S INDEMNITEE. PROVIDED FURTHER HOWEVER, AND IN ADDITION TO THE ABOVE, CONTRACTOR INDEMNIFIES EACH OF OWNER'S INDEMNITEES AGAINST CLAIMS FOR THE BODILY INJURY OR DEATH OF AN EMPLOYEE OF THE CONTRACTOR'S TEAM OF ANY TIER EVEN IF CAUSED BY THE SOLE OR CONCURRENT NEGLIGENCE OF AN OWNER'S INDEMNITEE. B. TO THE FULLEST EXTENT PERMITTED BY LAW, CONTRACTOR SHALL INDEMNIFY, DEFEND, AND HOLD HARMLESS THE OWNER'S INDEMNITEES FROM AND AGAINST INDEMNIFIED COSTS, ARISING OUT OF OR RELATING TO: (I) THE FAILURE TO CONTROL, CONTAIN, OR REMOVE A CONSTITUENT OF CONCERN BROUGHT TO THE SITE BY CONTRACTOR'S TEAM OR A HAZARDOUS ENVIRONMENTAL CONDITION CREATED BY CONTRACTOR'S TEAM, (II) CONTRACTOR'S TEAM'S ACTION OR INACTION RELATED TO DAMAGES, DELAYS, DISRUPTIONS, OR INTERFERENCE WITH THE WORK OF OWNER'S EMPLOYEES, OTHER CONTRACTORS, OR UTILITY OWNERS PERFORMING OTHER WORK AT OR ADJACENT TO THE SITE, OR (III) THE CORRECTION OF DEFECTIVE WORK. NOTHING IN THIS PARAGRAPH OBLIGATES THE CONTRACTOR TO INDEMNIFY THE OWNER'S INDEMNITEES FROM THE CONSEQUENCES OF THE OWNER'S AND OWNER'S INDEMNITEES OWN NEGLIGENCE. PROVIDED FURTHER HOWEVER, AND IN ADDITION TO THE ABOVE, CONTRACTOR INDEMNIFIES THE OWNER'S INDEMNITEES AGAINST CLAIMS FOR THE BODILY INJURY OR DEATH OF AN EMPLOYEE OF THE CONTRACTOR'S TEAM OF ANY TIER EVEN IF CAUSED BY THE SOLE OR CONCURRENT NEGLIGENCE OF OWNER'S INDEMNITEES. C. TO THE FULLEST EXTENT PERMITTED BY LAW, CONTRACTOR SHALL INDEMNIFY, DEFEND, AND HOLD HARMLESS THE OWNER'S INDEMNITEES FROM AND AGAINST INDEMNIFIED COSTS RESULTING FROM INFRINGEMENT ON PATENT RIGHTS OR COPYRIGHTS BY CONTRACTOR'S TEAM TO THE FULLEST EXTENT PERMITTED BY LAW. D. The indemnification obligations under this paragraph are not limited by the amount or type of damages, compensation, or benefits payable by or for members of the Contractor's Team or other individuals or entities under workers' compensation acts, disability benefit acts, or other employee benefit acts in claims against Owner's Indemnitees by an employee or the survivor or personal representative of employee of Contractor's Team. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-31 03-23-2015 E. The indemnification obligations of this Paragraph 7.14 do not extend to the liability of Designer arising out of the preparation of the Contract Documents or giving directions or instructions, or failing to give them, to the extent they are obligated to do so if that is the primary cause of the injury or damage. F. Notify the other party within 10 days if Owner or Contractor receives notice of any claim or circumstances that could give rise to an indemnified loss. The notice must include the following: 1. A description of the indemnification event in reasonable detail; 2. The basis on which indemnification may be due; and 3. The anticipated amount of the indemnified loss. This notice does not stop or prevent Owner's Indemnitees from later asserting a different basis for indemnification or a different amount of indemnified loss than that indicated in the initial notice. Owner's Indemnitees do not waive any rights to indemnification except to the extent that Contractor is prejudiced, suffers loss, or incurs expense because of the delay if Owner does not provide this notice within the 10 -day period. G. Defense of Indemnification Claims: 1. Assume the defense of the claim with counsel chosen by the Contractor and pay related costs, unless Owner decides otherwise. Contractor's counsel must be acceptable to Owner. Control the defense and any negotiations to settle the claim. Advise Owner's Indemnitees as to its defense of the claim within 10 days after being notified of the indemnification request. Owner's Indemnitees may assume and control the defense If Contractor does not assume the defense. Pay all defense expenses of the Owner's Indemnitees as an indemnified loss. 2. Owner's Indemnitees may retain separate counsel to participate in, but not control, the defense and any settlement negotiations if Contractor defends the claim. Contractor may not settle the claim without the consent or agreement of Owner. Contractor may settle the claim with Owner's consent and agreement unless it: a. Would result in injunctive relief or other equitable remedies or otherwise require Owner's Indemnitees to comply with restrictions or limitations that adversely affect Owner's Indemnitees; b. Would require Owner's Indemnitees to pay amounts that Contractor does not fund in full; or c. Would not result in Owner and Owner's Indemnitees' full and complete release from all liability to the plaintiffs or claimants who are parties to or otherwise bound by the settlement. 7.15 Delegation of Professional Design Services A. Contractor is not required to provide professional design services unless these services are specifically required by the Contract Documents for a portion of the Work or unless these services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences, and procedures. Contractor is not required to provide professional services in violation of applicable Laws and Regulations. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-32 03-23-2015 B. The Contract Documents specify performance and design criteria related to systems, materials, or equipment if professional design services or certifications by a design professional related to systems, materials, or equipment are specifically required of Contractor. These services or certifications must be provided by the licensed Texas Professional Engineer or Registered Architect who prepares, signs, and seals drawings, calculations, specifications, certifications, Shop Drawings, and other documents. C. OPT is entitled to rely upon the adequacy, accuracy, and completeness of the services, certifications, or approvals performed by Contractor's design professionals, provided OPT has specified to Contractor the performance and design criteria that these services must satisfy. D. Pursuant to this Paragraph 7.15, Designer's review and approval of design calculations and design drawings is only for the limited purpose of checking for conformance with the performance and design criteria given and the design concepts expressed in the Contract Documents. Designer's review and approval of Shop Drawings and other documents is only for the purpose stated in the Contract Documents. E. Contractor is not responsible for the adequacy of the performance or design criteria specified by OPT. Advise OPT if the performance or design criteria are known or considered likely to be inadequate or otherwise deficient. ARTICLE 8 — OTHER WORK AT THE SITE 8.01 Other Work A. Owner may arrange for other work at or adjacent to the Site which is not part of the Contractor's Work. This other work may be performed by Owner's employees or through other contractors. Utility owners may perform work on their utilities and facilities at or adjacent to the Site. Include costs associated with coordinating with entities performing other work or associated with connecting to this other work in the Contract Price if this other work is shown in the Contract Documents. B. OPT is to notify Contractor of other work prior to starting the work and provide any knowledge they have regarding the start of utility work at or adjacent to the Site to Contractor. C. Provide other contractors: 1. Proper and safe access to the Site; 2. Reasonable opportunity for the introduction and storage of materials and equipment; and 3. Reasonable opportunity to execute their work. D. Provide cutting, fitting, and patching of the Work required to properly connect or integrate with other work. Do not endanger the work of others by cutting, excavating, or otherwise altering the work of others without the consent of OAR and the others whose work will be affected. E. Inspect the work of others and immediately notify OAR if the proper execution of part of Contractor's Work depends upon work performed by others and this work has not been performed or is unsuitable for the proper execution of Contractor's Work. Contractor's General Conditions Corpus Christi Standards - Regular Projects 00 72 00-33 03-23-2015 failure to notify the OAR constitutes an acceptance of this other work as acceptable for integration with Contractor's Work. This acceptance does not apply to latent defects or deficiencies in the work of others. F. Take adequate measures to prevent damages, delays, disruptions, or interference with the work of Owner, other contractors, or utility owners performing other work at or adjacent to the Site. 8.02 Coordination A. Owner has sole authority and responsibility for coordination of this other work unless otherwise provided in the Contract Documents. The Owner is to identify the entity with authority and responsibility for coordination of the activities of the various contractors, the limitations of their authority, and the work to be coordinated prior to the start of other work at or adjacent to the Site. 8.03 Legal Relationships A. Contractor may be entitled to a change in Contract Price or Contract Times if, while performing other work at or adjacent to the Site for Owner, the OPT, other contractor, or utility owner: 1. Damages the Work or property of Contractor's Team; 2. Delays, disrupts, or interferes with the execution of the Work; or 3. Increases the scope or cost of performing the Work through their actions or inaction. B. Notify the OAR immediately of the event leading to a potential Change Proposal so corrective action can be taken. Submit the Change Proposal within 30 days of the event if corrective action has not adequately mitigated the impact of the actions or inactions of others. Information regarding this other work in the Contract Documents is used to determine if the Contractor is entitled to a change in Contract Price or Contract Times. Changes in Contract Price require that Contractor assign rights against the other contractor or utility owner to Owner with respect to the damage, delay, disruption, or interference that is the subject of the adjustment. Changes in Contract Times require that the time extension is essential to Contractor's ability to complete the Work within the Contract Times. C. Take prompt corrective action if Contractor's Team damages, delays, disrupts, or interferes with the work of Owner's employees, other contractors, or utility owners performing other work at or adjacent to the Site or agree to compensate other contractors or utility owners for correcting the damage. Promptly attempt to settle claims with other contractors or utility owners if Contractor damages, delays, disrupts, or interferes with the work of other contractors or utility owners performing other work at or adjacent to the Site. D. Owner may impose a set-off against payments due to Contractor and assign the Owner's contractual rights against Contractor with respect to the breach of the obligations described in this Paragraph 8.03 to other contractors or utility owners if damages, delays, disruptions, or interference occur. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-34 03-23-2015 E. Contractor's obligation to indemnify Owner's Indemnitees for claims arising out of or related damages, delays, disruptions, and interference with other work at the Site are as set forth in Paragraph 7.14. ARTICLE 9 — OWNER'S AND OPT'S RESPONSIBILITIES 9.01 Communications to Contractor A. OPT issues communications to Contractor through OAR except as otherwise provided in the Contract Documents. 9.02 Replacement of Owner's Project Team Members A. Owner may replace members of the OPT at its discretion. 9.03 Furnish Data A. OPT is to furnish the data required of OPT under the Contract Documents. 9.04 Pay When Due A. Owner is to make payments to Contractor when due as described in Paragraphs 15.01.0 and 15.05.0. 9.05 Lands and Easements; Reports and Tests A. Owner's duties with respect to providing lands and easements are described in Paragraph 5.01. OPT will make copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at the Site available to Contractor in accordance with Paragraph 5.03. 9.06 Insurance A. Owner's responsibilities with respect to purchasing and maintaining insurance are described in Article 6. 9.07 Modifications A. Owner's responsibilities with respect to Modifications are described in Article 11. 9.08 Inspections, Tests, and Approvals A. OPT's responsibility with respect to certain inspections, tests, and approvals are described in Paragraph 14.02. 9.09 Limitations on OPT's Responsibilities A. The OPT does not supervise, direct, or have control or authority over, and is not responsible for Contractor's means, methods, techniques, sequences, or procedures of construction, or related safety precautions and programs, or for failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. OPT is not responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-35 03-23-2015 9.10 Undisclosed Hazardous Environmental Condition A. OPT's responsibility for undisclosed Hazardous Environmental Conditions is described in Paragraph 5.06. 9.11 Compliance with Safety Program A. Contractor is to inform the OPT of its safety programs and OPT is to comply with the specific applicable requirements of this program. ARTICLE 10 — OAR'S AND DESIGNER'S STATUS DURING CONSTRUCTION 10.01 Owner's Representative A. OAR is Owner's representative. The duties and responsibilities and the limitations of authority of OAR as Owner's representative are described in the Contract Documents. 10.02 Visits to Site A. Designer is to make periodic visits to the Site to observe the progress and quality of the Work. Designer is to determine, in general, if the Work is proceeding in accordance with the Contract Documents based on observations made during these visits. Designer is not required to make exhaustive or continuous inspections to check the quality or quantity of the Work. Designer is to inform the OPT of issues or concerns and OAR is to work with Contractor to address these issues or concerns. Designer's visits and observations are subject to the limitations on Designer's authority and responsibility described in Paragraphs 9.09 and 10.07. B. OAR is to observe the Work to check the quality and quantity of Work, implement Owner's quality assurance program, and administer the Contract as Owner's representative as described in the Contract Documents. OAR's visits and observations are subject to the limitations on OAR's authority and responsibility described in Paragraphs 9.09 and 10.07. 10.03 Resident Project Representatives A. Resident Project Representatives assist OAR in observing the progress and quality of the Work at the Site. The limitations on Resident Project Representatives' authority and responsibility are described in Paragraphs 9.09 and 10.07. 10.04 Rejecting Defective Work A. OPT has the authority to reject Work in accordance with Article 14. OAR is to issue a Defective Work Notice to Contractor and document when Defective Work has been corrected or accepted in accordance with Article 14. 10.05 Shop Drawings, Modifications and Payments A. Designer's authority related to Shop Drawings and Samples are described in the Contract Documents. B. Designer's authority related to design calculations and design drawings submitted in response to a delegation of professional design services are described in Paragraph 7.15. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-36 03-23-2015 C. OAR and Designer's authority related to Modifications is described in Articles 11. D. OAR's authority related to Applications for Payment is described in Articles 13 and 15. 10.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. OAR is to render decisions regarding non-technical or contractual / administrative requirements of the Contract Documents and will coordinate the response of the OPT to Contractor. B. Designer is to render decisions regarding the conformance of the Work to the requirements of the Contract Documents. Designer will render a decision to either correct the Defective Work, or accept the Work under the provisions of Paragraph 14.04, if Work does not conform to the Contract Documents. OAR will coordinate the response of the OPT to Contractor. C. OAR will issue a Request for a Change Proposal if a Modification is required. OAR will provide documentation for changes related to the non-technical or contractual / administrative requirements of the Contract Documents. Designer will provide documentation if design related changes are required. D. Contractor may appeal Designer's decision by submitting a Change Proposal if Contractor does not agree with the Designer's decision. 10.07 Limitations on OAR's and Designer's Authority and Responsibilities A. OPT is not responsible for the acts or omissions of Contractor's Team. No actions or failure to act, or decisions made in good faith to exercise or not exercise the authority or responsibility available under the Contract Documents creates a duty in contract, tort, or otherwise of the OPT to the Contractor or members of the Contractor's Team. ARTICLE 11— AMENDING THE CONTRACT DOCUMENTS; CHANGES IN THE WORK 11.01 Amending and Supplementing the Contract Documents A. The Contract Documents may be modified by a Contract Amendment, Change Order, Work Change Directive, or Field Order. 1. Contract Amendment: Owner and Contractor may modify the terms and conditions of the Contract Documents without the recommendation of the Designer using a Contract Amendment. A Contract Amendment may be used for: a. Changes that do not involve: 1) The performance or acceptability of the Work; 2) The design as described in the Drawings, Specifications, or otherwise; or 3) Other engineering, architectural or technical matters. b. Authorizing new phases of the Work and establishing the Contract Price, Contract Times, or terms and conditions of the Contract for the new phase of Work when using phased construction or purchasing Goods and Special Services to be incorporated into the Project. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-37 03-23-2015 2. Change Order: All changes to the Contract Documents that include a change in the Contract Price or the Contract Times for previously authorized Work, or changes to the Work requiring Designer's approval must be made by a Change Order. A Change Order may also be used to establish modifications of the Contract Documents that do not affect the Contract Price or Contract Times. 3. Work Change Directive: A Work Change Directive does not change the Contract Price or the Contract Times, but is evidence that the parties expect that the modifications ordered or documented by a Work Change Directive are to be incorporated in a subsequently issued Change Order following negotiations on the Contract Price and Contract Times. Contractor must submit a Change Proposal seeking an adjustment of the Contract Price or the Contract Times no later than 30 days after the completion of the Work set out in the Work Change Directive if negotiations are unsuccessful under the terms of the Contract Documents governing adjustments, expressly including Paragraphs 11.04 and 11.05. 4. Field Order: Designer may require minor changes in the Work that do not change the Contract Price or Contract Times using a Field Order. OAR may issue a Field Order for non-technical, administrative issues. Submit a Change Proposal if Contractor believes that a Field Order justifies an adjustment in the Contract Price or Contract Times before proceeding with the Work described in the Field Order. B. Perform added or revised Work under the applicable provisions of the Contract Documents for the same or similar Work unless different Drawings, Specifications, or directions are provided in the Modification. 11.02 Owner -Authorized Changes in the Work A. Owner may order additions, deletions, or revisions in the Work at any time as recommended by the Designer to the extent the change: 1. Involves the design as described in the Contract Documents; 2. Involves acceptance of the Work; or 3. Involves other engineering, architectural or technical matters. B. These changes may be authorized by a Modification. Proceed with the Work involved or, in the case of a deletion in the Work, immediately cease construction activities with respect to the deleted Work upon receipt of the Modification. Nothing in this paragraph obligates the Contractor to undertake Work that Contractor reasonably concludes cannot be performed in a manner consistent with Contractor's safety obligations under the Contract Documents or Laws and Regulations. 11.03 Unauthorized Changes in the Work A. Contractor is not entitled to an increase in the Contract Price or an extension of the Contract Times with respect to Work performed that is not required by the Contract Documents, except in the case of an emergency as provided in Paragraph 7.12, or in the case of uncovering Work as provided in Paragraph 14.05. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-38 03-23-2015 B. Contractor is responsible for costs and time delays associated with variations from the requirements of the Contract Documents unless the variations are specifically approved by Change Order. 11.04 Change of Contract Price A. The Contract Price can only be changed by a Change Order. Any Change Proposal for an adjustment in the Contract Price must comply with the provisions of Paragraph 11.06. Any Claim for an adjustment of Contract Price must comply with the provisions of Article 12. B. An adjustment in the Contract Price is to be determined as follows: 1. By applying unit prices to the quantities of the items involved, subject to the provisions of Paragraph 13.03, where the Work involved is covered by unit prices in the Contract Documents; 2. By a mutually agreed lump sum where the Work involved is not covered by unit prices in the Contract Documents; or 3. Payment on the basis of the Cost of the Work determined as provided in Paragraph 13.01 plus a Contractor's fee for overhead and profit determined as provided in Paragraph 11.04.D when the Work involved is not covered by unit prices in the Contract Documents or the parties do not reach a mutual agreement to a lump sum. C. The original Contract Price may not be increased by more than 25 percent or the limit set out in Texas Local Government Code 252.048 or its successor statute. Owner may decrease the Work by up to 25 percent of the Contract. Price without adjusting Contractor's fee. D. Contractor's Fee: Determine the Contractor's fee for overhead and profit as follows: 1. A mutually acceptable fixed fee; or 2. A fee based on the following percentages of the various portions of the Cost of the Work: a. The Contractor's fee is 15 percent for costs incurred under Paragraphs 13.01.C.1 and 13.01.C.2; b. The Contractor's fee is 5 percent for costs incurred under Paragraph 13.01.C.3; c. Fees are to be determined as follows where one or more tiers of subcontracts are used: 1) The Subcontractor's fee is 15 percent for costs incurred under Paragraphs 13.01.C.1 and 13.01.C.2 for the Subcontractor that actually performs the Work at whatever tier; and 2) The Contractor and Subcontractors of a tier higher than that of the Subcontractor that actually performs the Work are to be allowed a fee of 5 percent of the fee plus underlying costs incurred by the next lower tier Subcontractor; d. No fee is payable on the basis of costs itemized under Paragraphs 13.01.C.4, and 13.01.D; e. Five percent of the net decrease in the cost is to be deducted for changes which result in a net decrease in Contract Price; and General Conditions Corpus Christi Standards - Regular Projects 00 72 00-39 03-23-2015 3. The adjustment in Contractor's fee is based on the net change in accordance with Paragraphs 11.04.D.2.a through 11.04.D.2.e, inclusive when both additions and credits are involved in any one change. 11.05 Change of Contract Times A. The Contract Times can only be changed by Change Order. Any Change Proposal for an adjustment in the Contract Times must comply with the provisions of Paragraph 11.06. Any Claim for an adjustment in the Contract Times must comply with the provisions of Article 12. B. An adjustment of the Contract Times is subject to the limitations described in Paragraph 4.04. 11.06 Change Proposals A. Submit a Change Proposal to the OAR to: 1. Request an adjustment in the Contract Price or Contract Times; 2. Appeal an initial decision by OPT concerning the requirements of the Contract Documents or relating to the acceptability of the Work under the Contract Documents; 3. Contest a set-off against payment due; or 4. Seek other relief under the Contract Documents. B. Notify the OAR immediately if a Change Proposal is to be submitted. Submit each Change Proposal to OAR no later than 30 days after the event initiating the Change Proposal. Submit the following as part of the Change Proposal: 1. Any proposed change in Contract Price, Contract Times, or other relief, accompanied by a statement that the requested Change Order is the entire adjustment to which Contractor believes it is entitled; 2. The reason for the proposed change; and 3. Supporting data, accompanied by a statement that the supporting data is accurate and complete. C. OAR is to advise OPT regarding the Change Proposal. OPT is to review each Change Proposal and Contractor's supporting data, and within 30 days after receipt of the documents, direct the OAR to either approve or deny the Change Proposal in whole or in part. OAR is to issue a Change Order for an approved Change Proposal. The Contractor may deem the Change Proposal to be denied if OAR does not take action on the Change Proposal within 30 days and start the time for appeal of the denial under Article 12. 11.07 Execution of Change Orders A. Owner and Contractor are to execute Change Orders covering: 1. Changes in the Contract Price or Contract Times which are agreed to by Owner and Contractor, including undisputed sums or amount of time for Work actually performed in accordance with a Work Change Directive; General Conditions Corpus Christi Standards - Regular Projects 00 72 00 - 40 03-23-2015 2. Changes in Contract Price resulting from Owner set -offs unless the set-off has been successfully challenged by Contractor; 3. Changes in the Work which are: a. Ordered by Owner pursuant to Paragraph 11.02.A, b. Required because Defective Work was accepted under Paragraph 14.04 or Owner's correction of Defective Work under Paragraph 14.07, or c. Agreed to by the Owner and Contractor; and 4. Changes in the Contract Price or Contract Times, or other changes under Paragraph 11.06 or Article 12. B. Acceptance of a Change Order by Contractor constitutes a full accord and satisfaction for any and all claims and costs of any kind, whether director indirect, including but not limited to impact, delay, or acceleration damages arising from the subject matter of the Change Order. Each Change Order must be specific and final as to prices and extensions of time, with no reservations or other provisions allowing for future additional money or time as a result of the particular changes identified and fully compensated in the Change Order. The execution of a Change Order by Contractor constitutes conclusive evidence of Contractor's agreement to the ordered changes in the Work. This Contract, as amended, forever releases any claim against Owner for additional time or compensation for matters relating to or arising out of or resulting from the Work included within or affected by the executed Change Order. This release applies to claims related to the cumulative impact of all Change Orders and to any claim related to the effect of a change on unchanged Work. C. All Change Orders require approval by either the City Council or Owner by administrative action. The approval process requires a minimum of 45 days after submission in final form with all supporting data. Receipt of Contractor's submission by Owner constitutes neither acceptance nor approval of a Bid, nor a warranty that the Bid will be authorized by City Council or administrative action. The time required for the approval process may not be considered a delay and no extensions to the Contract Times or increase in the Contract Price will be considered or granted as a result of the process. Contractor may proceed with Work if a Work Change Directive is issued. D. A Change Order is deemed to be in full force as if executed by Contractor if the Contractor refuses to execute a Change Order that is required to be executed under the terms of this Paragraph 11.07. 11.08 Notice to Surety A. Notify the surety of Modifications affecting the general scope of the Work, changes in the provisions of the Contract Documents, or changes in Contract Price or Contract Times. Adjust the amount of each Bond when Modifications change the Contract Price. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-41 03-23-2015 ARTICLE 12 — CLAIMS 12.01 Claims A. Follow the Claims process described in this Article for the following disputes between Owner and Contractor: 1. A demand or assertion by Owner to Contractor, submitted in accordance with the requirements of the Contract Documents: a. Seeking an adjustment of Contract Price or Contract Times; b. Contesting an initial decision by Designer concerning the requirements of the Contract Documents or the acceptability of Work under the Contract Documents; c. Contesting Designer's decision regarding a Change Proposal; d. Seeking resolution of a contractual issue that OAR has declined to address; or e. Seeking other relief with respect to the terms of the Contract. 2. A demand or assertion by Contractor to Owner, submitted in accordance with the requirements of the Contract Documents: a. Contesting OPT's decision regarding a Change Proposal; or b. Seeking resolution of a contractual issue that OPT has declined to address. 12.02 Claims Process A. Claims must be initiated by written notice. B. Claims by Contractor must be in writing and delivered to the Owner, Designer, and the OAR within 7 days: 1. After the start of the event giving rise to the Claim; or 2. After a final decision on a Change Proposal has been made. C. Claims by Owner must be submitted by written notice to Contractor. D. The responsibility to substantiate a Claim rests with the entity making the Claim. E. In the case of a Claim by Contractor seeking an increase in the Contract Price or Contract Times, Contractor must certify that the Claim is made in good faith, that the supporting data is accurate and complete, and that to the best of Contractor's knowledge and belief, the amount of time or money requested accurately reflects the full amount to which Contractor is entitled. F. The entity receiving a Claim is to review the Claim giving full consideration to its merits. The Owner and Contractor are to seek to resolve the Claim through the exchange of information and direct negotiations. The Owner and Contractor may extend the time for resolving the Claim by mutual agreement. Notify OAR of actions taken on a Claim. G. Owner and Contractor may mutually agree to mediate the underlying dispute at any time after initiation of a Claim. 1. The agreement to mediate suspends the Claim submittal and response process. General Conditions Corpus Christi Standards - Regular Projects 00 72 00 - 42 03-23-2015 2. Owner or Contractor may unilaterally terminate the mediation process after 50 days from the agreement to mediate and resume the Claim submittal and decision process as of the date of the termination. The Claim process resumes as of the date of the conclusion of the mediation, as determined by the mediator, if the mediation is unsuccessful in resolving the dispute. 3. Owner and Contractor are to each pay one-half of the mediator's fees and costs. H. If the entity receiving a Claim approves the Claim in part or denies it in part, this action is final and binding unless the other entity invokes the procedure described in Article 17 for final resolution of disputes within 30 days of this action. I. Notify the OAR if efforts to resolve the Claim are not successful, and the Claim is denied. A denial of the Claim is final and binding unless the other entity invokes the procedure described in Article 17 for the final resolution of disputes within 30 days of the denial. J. The results of the agreement or action on the Claim is to be incorporated in a Change Order by the OAR to the extent they affect the Contract Documents, the Contract Price, or the Contract Times if the Owner and Contractor reach a mutual agreement regarding a Claim. ARTICLE 13 — COST OF THE WORK; ALLOWANCES; UNIT PRICE WORK 13.01 Cost of the Work A. The Cost of the Work is the sum of costs described in this Paragraph 13.01, except those excluded in Paragraph 13.01.D, necessary for the proper performance of the Work. The provisions of this Paragraph 13.01 are used for two distinct purposes: 1. To determine Cost of the Work when Cost of the Work is a component of the Contract Price under cost-plus, time -and -materials, or other cost -based terms; or 2. To determine the value of a Change Order, Change Proposal, Claim, set-off, or other adjustment in Contract Price. B. Contractor is entitled only to those additional or incremental costs required because of the change in the Work or because of the event giving rise to the adjustment when the value of the adjustment is determined on the basis of the Cost of the Work. C. Costs included in the Cost of the Work may not exceed the prevailing costs in the proximate area of the Site for similar work unless agreed to by the Owner. Cost of the Work includes only the following items: 1. Payroll costs for Contractor's employees performing the Work, including one foreman per crew, and other required and agreed upon personnel for the time they are employed on the Work. Employees are to be paid according to wage rates for job classifications as agreed to by Owner. Where the Cost of the Work is being used under provisions of Paragraph 13.01.A.2, rates paid for this Work are to be the same as paid for Contract Work as established by certified payroll. Payroll costs may include: a. Actual costs paid for salaries and wages; b. Actual cost paid for fringe benefits, which may include: 1) Social security contributions, General Conditions Corpus Christi Standards - Regular Projects 00 72 00 - 43 03-23-2015 2) Unemployment, 3) Excise and payroll taxes, 4) Workers' compensation, 5) Health and retirement benefits, 6) Bonuses, and 7) Paid time off for sick leave, vacations, and holidays; and c. Actual cost of additional compensation paid for performing Work outside of regular working hours, on Saturday, Sunday, or legal holidays, to the extent authorized by Owner. 2. Cost of materials and equipment furnished and incorporated in the Work, including transportation and storage costs and required Suppliers' field services. Contractor may retain cash discounts unless Owner provided funds to the Contractor for early payment of these materials and equipment. Cash discounts are to be credited to Owner if the Owner provides funds for early payment. Make provisions for trade discounts, rebates, refunds, and returns from sale of surplus materials and equipment and reduce the Cost of the Work by these amounts. 3. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. Obtain competitive bids from Subcontractors acceptable to Owner unless Owner agrees to use Subcontractors proposed by the Contractor. Bids are to be opened in the presence of the OAR and other designated members for the OPT. Provide copies of bids to the OAR to use in determining, with the OPT, which bids are acceptable. The Subcontractor's Cost of the Work and fee are determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 13.01 if the subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee. 4. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work; b. Costs of materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site including transportation and maintenance costs; c. Costs of hand tools not owned by the workers consumed in the performance of the Work. Costs of hand tools not owned by the workers which are used but not consumed in the performance of the Work and which remain the property of Contractor, less their market value when Work is completed; d. Rental of construction equipment, including the costs of transporting, loading, unloading, assembling, dismantling, and removing construction equipment, whether rented from Contractor or others, in accordance with rental agreements approved by Owner. Costs for rental of equipment will not be paid when the equipment is no longer necessary for the Work. Justify idle time for equipment by demonstrating that it was necessary to keep equipment on Site for related future Work; General Conditions Corpus Christi Standards - Regular Projects 00 72 00 - 44 03-23-2015 e. Applicable sales, consumer, use, and other similar taxes related to the Work for which the Owner is not exempt, and which Contractor pays consistent with Laws and Regulations; f. Deposits lost for causes other than negligence of Contractor's Team; g. Royalty payments and fees for permits and licenses; h. Cost of additional utilities, fuel, and sanitary facilities at the Site; i. Minor expense items directly required by the Work; and j. Premiums for Bonds and insurance required by the Contract Documents. D. The Cost of the Work does not include the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals of partnerships and sole proprietorships, general managers, safety managers, superintendents, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office, for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 13.01.0.1 or specifically covered by Paragraph 13.01.C.4. These administrative costs are covered by the Contractor's fee. 2. Office expenses other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the actions of Contractor's Team for the correction of Defective Work, disposal of materials or equipment that do not comply with Specifications, and correcting damage to property. 5. Losses, damages, and related expenses caused by damage to the Work or sustained by Contractor in connection with the performance of the Work. Contractor is entitled to recover costs if covered by insurance provided in accordance with Article 6. Such losses may include settlements made with the approval of Owner. Do not include these losses, damages, and expenses in the Cost of the Work when determining Contractor's fee. 6. Any Indemnified Cost paid with regard to Contractor's indemnification of Owner's Indemnitees. 7. Other overhead or general expense costs and the costs of items not described in Paragraphs 13.01.C. E. The Contractor's fee is determined as follows: 1. In accordance with the Agreement when the Work is performed on a cost-plus basis. 2. In accordance with Paragraph 11.04.0 for Work covered by a Modification determined on the basis of Cost of the Work. F. Establish and maintain records in accordance with generally accepted accounting practices and submit these records, including an itemized cost breakdown together with supporting General Conditions Corpus Christi Standards - Regular Projects 00 72 00 - 45 03-23-2015 data, in a form and at intervals acceptable to OAR whenever the Cost of the Work is to be determined pursuant to this Paragraph 13.01. 13.02 Allowances A. Include allowances specified in the Contract Documents in the Contract Price and provide Work covered by the allowance as authorized by the Owner through the OAR. B. Contractor agrees that: 1. The cash allowance is used to compensate the Contractor for the cost of furnishing materials and equipment for the Work covered by the allowance item in the Contract Documents. Cost may include applicable taxes. Make provisions for trade discounts, rebates, and refunds and reduce the allowance costs by these amounts. 2. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the cash allowances have been included in the Contract Price and not in the allowances; and 3. Costs for cash allowances and installation costs as described in Paragraphs 13.02.6.1 and 13.02.6.2 above are included in the Contract Price. C. OAR will issue a Change Order to adjust the Contract Price by the difference between the allowance amount and the actual amount paid by Contractor for Work covered by the allowance. The Change Order will be issued at the time costs are incurred by Contractor for Work covered by the allowance and this Work is included on the Application for Payment. 13.03 Unit Price Work A. The initial Contract Price for Unit Price Work is equal to the sum of the unit price line items in the Agreement. Each unit price line item amount is equal to the product of the unit price for each line item times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparing Bids and determining an initial Contract Price. Payments to Contractor for Unit Price Work are to be based on actual quantities measured for Work in place. C. Each unit price is deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. D. OAR is to determine the actual quantities and classifications of Unit Price Work performed by Contractor to be incorporated into each Application for Payment. OAR's decision on actual quantities is final and binding, subject to the provisions of Paragraph 13.03.E. E. Contractor may submit a Change Proposal, or Owner may file a Claim, seeking an adjustment in the Contract Price within 30 days of OAR's decision under Paragraph 13.03.D, if: 1. The total cost of a particular item of Unit Price Work amounts to 20 percent or more of the total Contract Price and the variation in the quantity of that particular item of Unit Price Work performed by the Contractor differs by more than 20 percent from the estimated quantity of an item indicated in the Agreement; 2. There is no corresponding adjustment with respect to other items of Work; and General Conditions Corpus Christi Standards - Regular Projects 00 72 00 - 46 03-23-2015 3. Contractor believes it has incurred additional expense as a result of this condition or if Owner believes that the quantity variation entitles Owner to an adjustment in the Contract Price. 13.04 Contingencies A. Contingency funds may be included in the Contract Price to pay for Work not defined specifically by the Contract Documents that is essential to the completion of the Project. Contingency funds will be as described in the Agreement. B. The contingency funds may be used for costs incurred by the Contractor provided these costs are approved by the Owner. Costs are to be determined and documented in accordance with Paragraph 13.01. The contingency funds are not to be used for the following items: 1. Cost overruns due to changes in material costs after the Contract Price is established, unless specific price escalation provisions are made in the Agreement. 2. Rework required to correct Defective Work. 3. Inefficiencies in completing the Work due to the Contractor's selected means, methods, sequences, or procedures of construction. 4. Work Contractor failed to include in the Contract. Price. 5. Changes required by changes in Laws and Regulations enacted after the Contract Price is established. 6. Any Work that does not constitute a change in Scope in the Work included in the Contract Price. C. OAR is to issue a Change Order for approved expenditures from contingency funds. When the Change Order is issued, the costs are to be added to the Application for Payment. Contractor is to maintain a tabulation showing the contingency amount, adjustments to the contingency amount, and amounts remaining as the Project progresses. D. Any contingency amounts that are not included in a Change Order are retained by the Owner. A Change Order will be issued to deduct unused contingency amounts from the Contract Price prior to Final Payment. ARTICLE 14 — TESTS AND INSPECTIONS; CORRECTION, REMOVAL, OR ACCEPTANCE OF DEFECTIVE WORK 14.01 Access to Work A. Provide safe access to the Site and the Work for the observation, inspection, and testing of the Work in progress. Contractor can require compliance with Contractor's safety procedures and programs as part of providing safe access. 14.02 Tests, Inspections, and Approvals A. OPT may retain and pay for the services of an independent inspector, testing laboratory, or other qualified individual or entity to perform inspections. Notify OAR when the Work is ready for required inspections and tests. Provide adequate notice to allow for coordination General Conditions Corpus Christi Standards - Regular Projects 00 72 00 - 47 03-23-2015 with entities providing inspection or testing as determined by the OAR. Cooperate with inspection and testing personnel and assist with providing access for required inspections, tests, and handling test specimens or Samples. B. Arrange for and facilitate inspections, tests, and approvals required by Laws or Regulations of governmental entities having jurisdiction that require Work to be inspected, tested, or approved by an employee or other representative of that entity. Pay associated costs and furnish OAR with the required certificates of inspection or approval. C. Arrange, obtain, and pay for inspections and tests required: 1. By the Contract Documents, unless the Contract Documents expressly allocate responsibility for a specific inspection or test to OPT; 2. To attain OPT's acceptance of materials or equipment to be incorporated in the Work; 3. By manufacturers of equipment furnished under the Contract Documents; 4. For testing, adjusting, and balancing of mechanical, electrical, and other equipment to be incorporated into the Work; 5, For acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work; 6. For re -inspecting or retesting Defective Work, including any associated costs incurred by the testing laboratory for cancelled tests or standby time; and 7. For retesting due to failed tests. D. Provide independent inspectors, testing laboratories, or other qualified individuals or entities acceptable to OPT to provide these inspections and tests. 14.03 Defective Work A. It is Contractor's obligation to assure that the Work is not Defective. B. OPT has the authority to determine whether Work is Defective and to reject Defective Work. C. OAR is to notify Contractor of Defective Work of which OPT has actual knowledge. D. Promptly correct Defective Work. E. Take no action that would void or otherwise impair Owner's special warranties or guarantees when correcting Defective Work. F. Pay claims, costs, losses, and damages arising out of or relating to Defective Work, including: 1. Costs for correction, removal, and replacement of Defective Work; 2. Cost of the inspection and testing related to correction of Defective Work; 3. Fines levied against Owner by governmental authorities because of Defective Work; and 4. Costs of repair or replacement of work of others resulting from Defective Work. General Conditions Corpus Christi Standards - Regular Projects 00 72 00 - 48 03-23-2015 14.04 Acceptance of Defective Work A. Owner may elect to accept Defective Work instead of requiring correction or removal and replacement of Defective Work provided: 1. This acceptance occurs prior to final payment; 2. Designer confirms that the Defective Work is in general accordance with the design intent and applicable engineering or architectural principles; and 3. Designer confirms that acceptance of the Defective Work does not endanger public health or safety. B. Owner may impose a reasonable set-off against payments due under Article 15 for costs associated with OPT's evaluation of Defective Work to determine if it can be accepted and to determine the diminished value of the Work. Owner may impose a reasonable set-off against payments due under Article 15 if the parties are unable to agree as to the decrease in the Contract Price to compensate Owner for the diminished value of Defective Work accepted. OAR is to issue a Modification for acceptance of the Defective Work prior to final payment. Pay an appropriate amount to Owner if the acceptance of Defective Work occurs after final payment. 14.05 Uncovering Work A. OPT has the authority to require inspection or testing of the Work, whether or not the Work is fabricated, installed, or completed. B. Work that is covered prior to approval of the OAR must be uncovered for OPT's observation if requested by OAR. Pay for uncovering Work and its subsequent restoration unless Contractor has given OAR timely notice of Contractor's intention to cover the Work and OAR fails to act with reasonable promptness in response to this notice. C. Provide necessary labor, material, and equipment and uncover, expose, or otherwise make available the portion of the Work suspected of being Defective for observation, inspection, or testing if OPT considers it necessary or advisable that covered Work be observed by Designer or inspected or tested by others as directed by the OAR. 1. Pay for claims, costs, losses, and damages associated with uncovering, exposing, observing, inspecting, and testing if it is found that the uncovered Work is Defective. Pay costs for correction of Defective Work. Pay for reconstruction, repair, or replacement of work of others if it is found that the uncovered Work is Defective. 2. Submit a Change Proposal for an increase in the Contract Price or an extension of the Contract Times directly attributable to this uncovering, exposure, observation, inspection, testing, and reconstruction if the uncovered Work is found to be not Defective. 14.06 Owner May Stop the Work A. Owner may order Contractor to stop the Work if: 1. The Work is Defective; 2. Contractor fails to supply sufficient skilled workers or suitable materials or equipment; or General Conditions Corpus Christi Standards - Regular Projects 00 72 00 - 49 03-23-2015 3. Contractor performs Work that may fail to conform to the Contract Documents when completed. This stop work order is to remain in effect until the reason for the stop work order has been eliminated. Owner's right to stop the Work does not create a duty to exercise this right for the benefit of Contractor's Team or surety. 14.07 Owner May Correct Defective Work A. Owner may remedy the following deficiencies after 7 days' notice to Contractor if: 1. Contractor fails to correct Defective Work, or to remove and replace rejected Work as required by OPT; 2. Contractor fails to perform the Work in accordance with the Contract Documents; or 3. Contractor fails to comply with other provisions of the Contract Documents. B. Owner may: 1. Exclude Contractor from the Site; 2. Take possession of the Work and suspend Contractor's services related to the Work; and 3. Incorporate stored materials and equipment in the Work. C. Allow OPT access to the Site and off Site storage areas to enable Owner to exercise the rights and remedies under this Paragraph 14.07. D. All claims, costs, losses, and damages incurred or sustained by Owner in exercising the rights and remedies under this Paragraph 14.07 are to be charged against Contractor as a set-off against payments due under Article 15. These claims, costs, losses, and damages include costs of repair and the cost of replacement of work of others destroyed or damaged by correction, removal, or replacement of Contractor's Defective Work. E. Contractor is not allowed an extension of the Contract Times because of delays in the performance of the Work attributable to the exercise of the Owner's rights and remedies under this Paragraph 14.07. ARTICLE 15 — PAYMENTS TO CONTRACTOR; SET -OFFS; COMPLETION; CORRECTION PERIOD 15.01 Progress Payments A. Progress payments are to be submitted to the OAR on the Application for Payment form provided by the OAR following procedures in the Contract Documents. 1. Progress payments for lump sum Work are to be paid on the basis of the earned value to date at the amounts shown in the Schedule of Values submitted as required by Paragraph 2.03. Final payment will be for the total lump sum amount. 2. Progress payments for Unit Price Work are based on the number of units completed as determined under the provisions of Paragraph 13.03. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-50 03-23-2015 3, Progress payments for Work to be paid on the basis of the Cost of the Work per Paragraphs 13.01, 13.02 and 13.04 are to be paid for Work completed by Contractor during the pay period. B. Reduction in Payment by Owner: 1. Owner is entitled to impose a set-off against payment based on the following: a. Claims made against Owner or costs, losses, or damages incurred by Owner related to: 1) Contractor's conduct in the performance of the Work, including, but not limited to, workplace injuries, non-compliance with Laws and Regulations, or patent infringement; or 2) Contractor's failure to take reasonable and customary measures to avoid damage, delay, disruption, and interference with other work at or adjacent to the Site, including but not limited to, workplace injuries, property damage, and non-compliance with Laws and Regulations. b. Owner has been required to remove or remediate a Hazardous Environmental Condition for which Contractor is responsible; c. Work is Defective, or completed Work has been damaged by Contractor's Team, requiring correction or replacement; d. Owner has been required to correct Defective Work or complete Work in accordance with Paragraph 14.07; e. The Contract Price has been reduced by Change Orders; f. Events have occurred that would constitute a default by Contractor justifying a termination for cause; Liquidated damages have accrued as a result of Contractor's failure to achieve Milestones, Substantial Completion, or completion of the Work; h. Liens have been filed in connection with the Work, except where Contractor has delivered a specific Bond satisfactory to Owner to secure the satisfaction and discharge of these Liens; g. i. Owner has been notified of failure to make payments to Subcontractors, Suppliers, or Employees; Failure to submit up-to-date record documents as required by the Contract Documents; k. Failure to submit monthly Progress Schedule updates or revised schedules as requested by the OAR; I. Failure to provide Project photographs required by the Contract Documents; m. Failure to provide Certified Payroll required by the Contract Documents; n. Compensation for OPT for overtime charges of OAR or RPR, third review of documents, review of substitutions, re -inspection fees, inspections or designs related to correction of Defective Work, or other services identified as requiring payment by the Contractor; j. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-51 03-23-2015 o. Costs for tests performed by the Owner to verify that Work previously tested and found to be Defective has been corrected; OPT has actual knowledge of the occurrence of events that would constitute a default by Contractor and therefore justify termination for cause under the Contract Documents with associated cost impacts; P. q. Other items entitling Owner to a set-off against the amount recommended; or r. Payment would result in an over -payment of the Contract Price. 2. Compensation for services of OPT staff is to be at the rates established by negotiations between OPT and Contractor. 3. OAR is to notify Contractor stating the amount and the reasons for an imposed set-off. The Owner is to pay the Contractor amounts remaining after deduction of the set-off. Owner is to pay the set-off amount agreed to by Owner and Contractor if Contractor remedies the reasons for the set-off. Contractor may submit a Change Proposal contesting the set-off. C. Delayed Payments: 1. No money shall be paid by Owner upon any claim, debt, demand, or account whatsoever, to any person, firm, or corporation who is in arrears to Owner for taxes; and Owner shall be entitled to counterclaim and automatically offset against any such debt, claim, demand, or account in the amount of taxes so in arrears and no assignment or transfer of such debt, claim, demand, or account after said taxes are due, shall affect the right of Owner to offset said taxes, and associated penalties and interest if applicable, against the same. 2. No payment will be made for Work authorized by a Work Change Directive until the Work Change Directive is incorporated into a Change Order. Payment can be included in an Application for payment when the Change Order is approved. D. The Owner is to pay the amount of payment recommended by the OAR within 30 days after receipt of the Application for Payment and accompanying documentation from the OAR. 15.02 Contractor's Warranty of Title A. Contractor warrants and guarantees that title to the Work, materials, and equipment furnished under the Contract is to pass to Owner free and clear of Liens, title defects, and patent, licensing, copyright, or royalty obligations no later than 7 days after the time of payment by Owner of the Application for Payment which includes these items. 15.03 Substantial Completion A. Notify OAR when Contractor considers the entire Work substantially complete and request a Certificate of Substantial Completion. B. OPT is to inspect the Work after Contractor's notification to determine if the Work is substantially complete. OAR is to either issue the Certificate of Substantial Completion which sets the date of Substantial Completion or notify Contractor of the reasons the Project is not considered to be substantially complete. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-52 03-23-2015 C. The OPT and Contractor are to meet to discuss Owner's use or occupancy of the Work following Substantial Completion. Items to be discussed at this meeting include: 1. Review of insurance policies with respect to the end of the Contractor's coverage, and confirm the transition to coverage of the Work under a permanent property insurance policy held by Owner; 2. Owner's assumption of responsibility for security, operation, protection of the Work, maintenance, and utilities upon Owner's use or occupancy of the Work; 3. Contractor's obligations for operations and maintenance during performance and acceptance testing; 4. Contractor's access to the Site to complete punch list items; and 5. Procedures for correction of Defective Work during the 1 -year correction period. 15.04 Partial Utilization A. Owner may use or occupy substantially completed parts of the Work which are specifically identified in the Contract Documents, or which OPT and Contractor agree constitutes a separately functioning and usable part of the Work prior to Substantial Completion of the Work. Owner must be able to use that part of the Work for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. Contractor and OPT are to follow the procedures of Paragraph 15.03 for this part of the Work. B. No use or occupancy or separate operation of part of the Work may occur prior to compliance with the requirements of Article 6. 15.05 Final Inspection A. OPT is to make a final inspection upon notice from Contractor that the entire Work or portion to be accepted under Paragraph 15.04 is complete. OAR is to notify Contractor of Work determined to be incomplete or Defective. Immediately take corrective measures to complete the Work and correct Defective Work. 15.06 Final Payment A. Make Application for Final Payment after completing required corrections identified during the final inspection and delivering items and documents required by the Contract. Documents. Provide the following with the final Application for Payment: 1. Consent of Surety to Final Payment acknowledging unsettled disputes; and 2. Certification of Payment of Debts and Claims or Certification of Release of Liens or furnish receipts or releases in full from Subcontractors and Suppliers. B. OAR is to either recommend payment of the final Application for Payment to Owner if OPT is satisfied that the Work has been completed and Contractor's other obligations under the Contract Documents have been fulfilled or notify the Contractor of the OPT's reasons for not recommending final payment. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-53 03-23-2015 C. The Work is complete, subject to surviving obligations, when it is ready for final payment as established by the OAR's recommendation of payment of the final Application for Payment to Owner and the issuance of a Certificate of Final Completion. D. The Owner is to pay the amount of final payment recommended by the OAR within 30 days after receipt of the final Application for Payment and accompanying documentation from the OAR. 15.07 Waiver of Claims A. The making of final payment does not constitute a waiver by Owner of claims or rights against Contractor. Owner expressly reserves claims and rights arising from: 1. Unsettled Liens or claims for non-payment; 2. Defective Work appearing after final inspection pursuant to Paragraph 15.05; 3. Contractor's failure to comply with the Contract Documents or the terms of specified special guarantees; or 4. Contractor's continuing obligations under the Contract Documents. B. Contractor waives claims and rights against Owner by accepting final payment with the exception of those Claims made in accordance with the provisions of Article 17 and specifically noted in the Certificate of Final Completion. 15.08 Correction Period A. Promptly correct Defective Work without cost to Owner for 1 year after the date of Substantial Completion or longer periods of time prescribed by the terms of the Contract Documents. B. Promptly correct damages to the Site or adjacent areas that Contractor has arranged to use through construction easements or other agreements. Promptly correct damages to Work or the work of others. Make corrections without cost to Owner. C. Owner may have the Defective Work and damages described in Paragraphs 15.08.A and 15.08.6 corrected if Contractor does not comply with the terms of OAR's instructions, or in an emergency where delay would cause serious risk of loss or damage. D. Contractor's obligation to indemnify Owner's Indemnitees for claims arising out of or related to the correction of Defective Work are as set forth in Paragraph 7.14. E. The correction period starts to run from the date when a specific item of equipment or systems are placed in continuous beneficial use by Owner before Substantial Completion of Work if so provided in the Specifications or if accepted for beneficial use by the Owner. F. The correction period is extended for an additional period of 1 year for Defective Work corrected after the date of Substantial Completion or after the accepted date the correction period starts to run as described in Paragraph 15.08.E. This extended correction period starts to run when Defective Work has been satisfactorily corrected under this Paragraph 15.08. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-54 03-23-2015 G. Contractor's obligations under this Paragraph 15.08 are in addition to other obligations or warranties. The provisions of this Paragraph 15.08 are not a substitute for, or a waiver of, the provisions of applicable statutes of limitation or repose. ARTICLE 16 —SUSPENSION OF WORK AND TERMINATION 16.01 Owner May Suspend Work A. Owner may suspend the Work or a portion of the Work for a period of not more than 90 consecutive days, at any time and without cause, by notice to Contractor. This notice fixes the date on which Contractor is to resume Work. Contractor is entitled to adjustments in the Contract Price and Contract Times directly attributable to this suspension only if efforts are made to mitigate the cost impacts of the suspension. Meet with the Owner within 10 days of the notice of suspension to discuss specific strategies to reduce or eliminate the cost of delays. Submit a Change Proposal seeking an adjustment no later than 30 days after the date fixed for resumption of Work. 16.02 Owner May Terminate for Cause A. The occurrence of one or more of the following events constitutes a default by Contractor and justifies termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents, including failure to supply sufficient skilled workers or suitable materials or equipment; 2. Failure to adhere to the Progress Schedule; 3. Failure of the Contractor to provide a satisfactory replacement Bond or insurance in the event either is lost or canceled; 4. Failure of Contractor to maintain financial solvency to adequately complete the Project as indicated by one or more of the following: a. A petition of bankruptcy is filed by or against Contractor, b. Contractor is adjudged as bankrupt or insolvent, c. Contractor or surety makes a general assignment for the benefit of creditors, d. A receiver is appointed for the benefit of Contractor's creditors, or e. A receiver is appointed on account of Contractor's insolvency; 5. Contractor's disregard of Laws or Regulations of public bodies having jurisdiction; or 6. Contractor's repeated disregard of the authority of OPT. B. Contractor and surety must provide adequate assurance of future performance in accordance with the Contract Documents that is satisfactory to Owner if Contractor is believed to be in financial distress due to the existence of one or more of the indicators listed in Paragraph 16.02.A.4. Owner may terminate this Contract if Contractor and surety fail to provide adequate documentation satisfactory to Owner within 10 days of OAR's request for this information. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-55 03-23-2015 C. Owner may declare Contractor to be in default, give notice to Contractor and surety that. the Contract is terminated, and enforce the rights available to Owner under the Performance Bond after giving Contractor and surety 10 days' notice that one or more of the events identified in Paragraph 16.02.A has occurred. D. Owner may exclude Contractor from the Site, take possession of the Work, incorporate the materials and equipment stored and complete the Work as Owner may deem expedient if Owner has terminated the Contract for cause. E. Owner may elect not to proceed with termination of the Contract under this Paragraph 16.02 if Contractor begins to cure the cause for termination within 7 days of receipt of notice of intent to terminate. F. Contractor is not entitled to receive further payments until the Work is completed if Owner proceeds as provided in this Paragraph 16.02. The amount of the Contract Price remaining is to be paid to the Contractor if the unpaid balance exceeds the cost to complete the Work. This cost to complete the Work may include related claims, costs, losses, damages, and the fees and charges of engineers, architects, attorneys, and other professionals retained by Owner. Pay the difference to Owner if the cost to complete the Work including related claims, costs, losses, and damages exceeds the unpaid balance of the Contract Price. Claims, costs, losses, and damages incurred by Owner are to be reviewed as to their reasonableness and incorporated in a Change Order by OAR. Owner is not required to obtain the lowest price for the Work performed when exercising its rights or remedies under this paragraph. G. Termination does not affect the rights or remedies of Owner against Contractor or against surety under the Payment Bond or Performance Bond. Owner does not release Contractor from liability by paying or retaining money due Contractor. 16.03 Owner May Terminate For Convenience A. Owner may terminate the Contract without cause after giving 7 days' notice to Contractor of the effective date of termination. Contractor is to be paid for the following if Owner terminates for convenience: 1. Work completed in accordance with the Contract Documents prior to the effective date of termination; 2. Actual costs sustained prior to the effective date of termination for Work in progress, plus a fee calculated in accordance with Paragraph 11.04.D.; and 3. Reasonable expenses directly attributable to termination, including costs incurred to prepare a termination for convenience cost proposal. B. No payment is payable to Contractor for loss of anticipated overhead, profits or revenue, or other economic loss arising out of or resulting from this termination. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-56 03-23-2015 ARTICLE 17 — FINAL RESOLUTION OF DISPUTES 17.01 Methods and Procedures A. The Owner or Contractor may appeal a Claim, approved or denied in part or in full, by: 1. Electing to invoke the dispute resolution process if one is provided for in the Supplementary Conditions; 2. Agreeing with the other party to submit the dispute to a dispute resolution process; or 3. Notifying the other party of the intent to submit the dispute to a court of competent jurisdiction if no dispute resolution process is provided for in the Supplementary Conditions or mutually agreed to. ARTICLE 18 — MISCELLANEOUS 18.01 Computation of Times A. Exclude the first day and include the last day when determining dates fora period of time referred to in the Contract Documents by days. The last day of this period is to be omitted from the determination if it falls on a Saturday, Sunday, or a legal holiday. B. All references and conditions for a Calendar Day Contract in the Contract Documents apply for a Fixed Date Contract. A Fixed Date Contract is one in which the calendar dates for reaching Substantial Completion and/or final completion are specified in lieu of identifying the number of days involved. 18.02 Owner's Right to Audit Contractor's Records A. By execution of the Contract, Contractor grants Owner the right to audit, examine, inspect and/or copy, at Owner's election at all reasonable times during the term of this Contract and for a period of four (4) years following the completion or termination of the Work, all of Contractor's written and electronically stored records and billings relating to the performance of the Work under the Contract Documents. The audit, examination or inspection may be performed by an Owner designee, which may include its internal auditors or an outside representative engaged by Owner. Contractor agrees to retain its records fora minimum of four (4) years following termination of the Contract, unless there is an ongoing dispute under the Contract, then, such retention period must extend until final resolution of the dispute. As used in these General Conditions, "Contractor written and electronically stored records" include any and all information, materials and data of every kind and character generated as a result of the work under this Contract. Example of Contractor written and electronically stores records include, but are not limited to: accounting data and reports, billings, books, general ledgers, cost ledgers, invoices, production sheets, documents, correspondences, meeting notes, subscriptions, agreements, purchase orders, leases, contracts, commitments, arrangements, notes, daily diaries, reports, drawings, receipts, vouchers, memoranda, time sheets, payroll records, policies, procedures, Subcontractor agreements, Supplier agreements, rental equipment proposals, federal and state tax filings for any issue in question, along with any and all other agreements, sources of information and matters that may, in Owner's sole judgment, General Conditions Corpus Christi Standards - Regular Projects 00 72 00-57 03-23-2015 have any bearing on or pertain to any matters, rights, duties or obligations under or covered by any Agreement Documents. B. Owner agrees to exercise the right to audit, examine or inspect Contractor's records only during regular business hours. Contractor agrees to allow Owner and/or Owner's designee access to all of the Contractor's Records, Contractor's facilities and current or former employees of Contractor, deemed necessary by Owner or its designee(s), to perform such audit, inspection or examination. Contractor also agrees to provide adequate and appropriate work space necessary for Owner or its designees to conduct such audits, inspections or examinations. C. Contractor must include this Section in any Subcontractor, supplier or vendor contract. 18.03 Independent Contractor A. Contractor is to perform its duties under this Contract as an independent contractor. The Contractor's Team and their personnel are not considered to be employees or agents of the Owner. Nothing in this Contract is to be interpreted as granting Contractor's Team the right or authority to make commitments for the Owner. This Contract does not constitute or create a joint venture, partnership, or formal business organization of any kind. 18.04 Cumulative Remedies A. The duties and obligations imposed by these General Conditions and the rights and remedies available to the Owner or Contractor by these General Conditions are in addition to, and are not a limitation of, the rights and remedies which are otherwise imposed or available by: 1. Laws or Regulations; 2. Special warranties or guarantees; or 3. Other provisions of the Contract Documents. B. The provisions of this Paragraph 18.03 are as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. 18.05 Limitation of Damages A. Owner's Indemnitees are not liable to Contractor for claims, costs, losses, or damages sustained by Contractor's Team associated with other projects or anticipated projects. 18.06 No Waiver A. The failure of Owner or Contractor to enforce any provision of this Contract does not constitute a waiver of that provision, affect the enforceability of that provision, or the enforceability of the remainder of this Contract. 18.07 Severability A. If a court of competent jurisdiction renders a part of this Contract invalid or unenforceable, that part is to be severed and the remainder of this Contract continues in full force. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-58 03-23-2015 18.08 Survival of Obligations A. Representations, indemnifications, warranties, guarantees, and continuing obligations required by the Contract Documents survive completion and acceptance of the Work or termination of the Contract. 18.09 No Third Party Beneficiaries A. Nothing in this Contract can be construed to create rights in any entity other than the Owner and Contractor. Neither the Owner nor Contractor intends to create third party beneficiaries by entering into this Contract. 18.10 Assignment of Contract A. This Contract may not be assigned in whole or in part by the Contractor without the consent of the Owner. 18.11 No Waiver of Sovereign Immunity A. The Owner has not waived its sovereign immunity by entering into and performing its obligations under this Contract. 18.12 Controlling Law A. This Contract is governed by the laws of the State of Texas without regard to its conflicts of laws. Venue for legal proceedings lies exclusively in Nueces County, Texas. 18.13 Conditions Precedent to Right to Sue A. Notwithstanding anything herein to the contrary, Contractor will have at least 90 days to give notice of a claim for damages as a condition precedent to the right to sue on the Contract, subject to the contractual Claims and Alternative Dispute Resolution processes set forth herein. 18.14 Waiver of Trial by Jury A. Owner and Contractor agree that they have knowingly waived and do hereby waive the right to trial by jury and have instead agreed, in the event of any litigation arising out of or connected to this Contract, to proceed with a trial before the court, unless both parties subsequently agree otherwise in writing. 18.15 Attorney Fees A. The Parties expressly agree that, in the event of litigation, all parties waive rights to payment of attorneys' fees that otherwise might be recoverable, pursuant to the Texas Civil Practice and Remedies Code Chapter 38, Texas Local Government Code §271.153, the Prompt Payment Act, common law or any other provision for payment of attorney's fees. 18.16 Compliance with Laws A. Comply with the Americans with Disabilities Act of 1990 as amended (ADA) and Texas Architectural Barriers Act and all regulations relating to either statute. General Conditions Corpus Christi Standards - Regular Projects 00 72 00-59 03-23-2015 B. Comply with all applicable federal, state, and city laws, rules and regulations. 18.17 Enforcement A. The City Manager or designee and the City Attorney or designee, are fully authorized and will have the right to enforce all legal rights and obligations under the Contract without further authorization from City Council. 18.18 Subject to Appropriation A. Funds are appropriated by the Owner on a yearly basis. If for any reason funds are not appropriated in any given year, the Owner may direct immediate suspension or termination of the Contract, with no additional liability to the Owner. If the Contractor is terminated or suspended and the Owner requests remobilization at a later date, the Contractor may request payment for reasonable demobilization/remobilization costs. Such costs shall be addressed through a Change Order to the Contract. Under no circumstances may a provision or obligation under this Contract be interpreted as contrary to this paragraph. 18.19 Contract Sum A. The Contract Sum is stated in the Contract and, including authorized adjustments, is the total maximum not -to -exceed amount payable by Owner to Contractor for performance of the Work under the Contract Documents. Contractor accepts and agrees that all payments pursuant to this Contract are subject to the availability and appropriation of funds by the Corpus Christi City Council. If funds are not available and/or appropriated, this Contract shall immediately be terminated with no liability to any party to this Contract. 18.20 Contractor's Guarantee as Additional Remedy A. The Contractor's guarantee is a separate and additional remedy available to benefit the Owner. Neither the guarantee nor the expiration of the guarantee period will operate to reduce, release, or relinquish any rights or remedies available to the Owner for any claims or causes of action against the Contractor or any other individual or entity. END OF SECTION General Conditions Corpus Christi Standards - Regular Projects 00 72 00-60 03-23-2015 00 72 01 INSURANCE REQUIREMENTS ARTICLE 1— INSURANCE REQUIREMENTS 1.01 CONTRACTOR'S INSURANCE AMOUNTS A. Provide the insurance coverage for at least the following amounts unless greater amounts are required by Laws and Regulations: Type of Insurance Minimum Insurance Coverage Commercial General Liability including 1. Commercial Form 2. Premises — Completed Operations 3. Explosions and Collapse Hazard 4. Underground Hazard 5. Products / Completed Operations Hazard 6. Contractual Liability 7. Broad Form Property Damage 8. Independent Contractors 9. Personal & Advertising Injury $1,000,000 Per Occurrence $2,000,000 Aggregate Business Automobile Liability - Owned, Non -Owned, Rented and Leased $1,000,000 Combined Single Limit Workers' Compensation Statutory Employer's Liability $500,000/ 500,000/ 500,000 Excess Liability/Umbrella Liability Required if Contract Price > $5,000,000 $1,000,000 Per Occurrence Contractor's Pollution Liability / Environmental Impairment Coverage Not limited to sudden and accidental discharge. To include long-term environmental impact for the disposal of pollutants/contaminants. Required if excavation > 3 ft $1,000,000 Per Claim X Required • Not Required Builder's Risk (All Perils including Collapse) Required for vertical structures and bridges Equal to Full Replacement Cost of Structure and Contents X Required ■ Not Required Installation Floater Required if installing city -owned equipment Equal to Contract Price ■ Required X Not Required Insurance Requirements O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 007201-1 Rev 06-22-2016 1.02 GENERAL PROVISIONS A. Provide insurance coverages and limits meeting the requirements for insurance in accordance with Article 6 of the General Conditions and this Section. B. Provide endorsements to the policies as outlined in this Section. C. Obtain insurance from companies that are duly licensed or authorized in the State of Texas to issue insurance policies for the required limits and coverages. Provide insurance from companies that have an A.M. Best rating of A -VIII or better. D. Furnish copies of endorsements and documentation of applicable self-insured retentions and deductibles upon request by OPT or any named insured or additional insured. Contractor may block out (redact) any confidential premium or pricing information contained in any endorsement furnished under this Contract. E. The name and number of the Project must be referenced on the certificate of insurance. F. OPT's failure to demand such certificates or other evidence of the Contractor's full compliance with the insurance requirements or failure to identify a deficiency in compliance from the evidence provided is not a waiver of the Contractor's obligation to obtain and maintain the insurance required by the Contract Documents. G. Notify the Owner if the Contractor fails to purchase or maintain the insurance required by the Contract. Documents. Contractor shall not be allowed to perform any Work on the Project until the required insurance policies are in effect. A Certificate of Liability Insurance shall be submitted to the OPT. H. Owner may exclude the Contractor from the Site and exercise Owner's termination rights under Article 16 of the General Conditions if Contractor fails to obtain or maintain the required insurance. I. Owner does not represent that the insurance coverage and limits established in this Contract are adequate to protect Contractor or Contractor's interests. J. The required insurance and insurance limits do not limit the Contractor's liability under the indemnities granted to Owner's Indemnitees in the Contract Documents. K. Provide for an endorsement that the "other insurance" clause shall not apply to the OPT where the OPT is an additional insured shown on the policy. Contractor's insurance is primary and non-contributory with respect to any insurance or self-insurance carried by the OPT for liability arising out of operations under this Contract. L. Include the Owner and list the other members of the OPT and any other individuals or entities identified in the Supplementary Conditions as additional insureds on all policies with the exception of the workers' compensation policy and Contractor's professional liability policy. 1.03 CONTRACTOR'S INSURANCE A. Purchase and maintain workers' compensation and employer's liability insurance for: 1. Claims under workers' compensation, disability benefits, and other similar employee benefit acts. Obtain workers' compensation coverage through a licensed insurance company in accordance with Texas law and written on a policy and endorsements Insurance Requirements O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 007201-2 Rev 06-22-2016 approved by the Texas Department of Insurance. Provide insurance in amounts to meet all workers' compensation obligations. Provide an "All Other States" endorsement if Contractor is not domiciled in Texas and policy is not written in accordance with Texas Department of Insurance rules. 2. Claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. United States Longshoreman and Harbor Workers' Compensation Act and Jones Act coverage (if applicable). 4. Foreign voluntary worker compensation (if applicable). B. Purchase and maintain commercial general liability insurance covering all operations by or on behalf of Contractor. The expected coverage is that which would be included in a commercially available ISO Commercial General Liability policy and should provide coverage on an occurrence basis, against: 1. Claims for damages because of bodily injury, sickness or disease, or death of any person other than Contractor's employees; 2. Claims for damages insured by reasonably available personal injury liability coverage which are sustained; 3. By any person as a result of an offense directly or indirectly related to the employment of such person by Contractor; and 4. Claims for damages, other than to the Work itself, because of injury to or destruction of tangible property wherever located, including any resulting loss of use. C. Provide Contractor's commercial general liability policy that is written on a 1996 (or later) ISO commercial general liability form (occurrence form) and include the following coverages and endorsements: 1. Products and completed operations coverage as required in this Section. Insurance is to remain in effective for 3 years after final payment. Furnish evidence of the continuation of this insurance at final payment and again each year for 3 years after final payment to Owner and each named insured or additional insured. a. If required by Paragraph 1.01, provide and maintain Installation Floater insurance for property under the care, custody, or control of Contractor. Provide Installation Floater insurance that is a broad form or "All Peril" policy providing coverage for all materials, supplies, machinery, fixtures, and equipment which will be incorporated into the Work. 1) Provide coverage under the Contractor's Installation Floater that includes: a) Faulty or Defective workmanship, materials, maintenance, or construction; b) Cost to remove Defective or damaged Work from the Site or to protect it from loss or damage; c) Cost to cleanup and remove pollutants; d) Coverage for testing and startup; Insurance Requirements O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 007201-3 Rev 06-22-2016 e) Any loss to property while in transit; f) Any loss at the Site; g) Any loss while in storage, both on and off the Site; and h) Any loss to temporary Project Works if their value is included in the Contract Price. 2) Coverage cannot be contingent on an external cause or risk or limited to property for which the Contractor is legally liable. Provide limits of insurance adequate to cover the value of the installation. Pay any deductible carried under this coverage and assume responsibility for claims on materials, supplies, machinery, fixture, and equipment which will be incorporated into the Work while in transit or in storage. 2. Blanket contractual liability coverage for Contractor's contractual indemnity obligations in Paragraph 7.14 of the General Conditions, and all other contractual indemnity obligations of Contractor in the Contract Documents. Industry standard ISO Contractual Liability coverage will meet this obligation. 3. Broad form property damage coverage. 4. Severability of interest. 5. Underground explosion and collapse coverage. 6. Personal injury coverage. 7. Endorsement CG 2032, "Additional Insured - Engineers, Architects or Surveyors Not Engaged by the Named Insured" or its equivalent. D. Purchase and maintain automobile liability insurance against claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, maintenance or use of any motor vehicle. E. For Projects with a Contract Value that exceeds $5,000,000, purchase and maintain umbrella or excess liability insurance written over the underlying employer's liability, commercial general liability, and automobile liability insurance described in the paragraphs above. Provide coverage that is at least as broad as all underlying policies. Provide a policy that provides first -dollar liability coverage as needed. F. Provide Contractor's commercial general liability and automobile liability policies that: 1. Are written on an occurrence basis; 2. Include the individuals or entities identified in the Supplementary Conditions as additional insureds; 3. Include coverage for Owners Indemnitees as defined in Article 1 of the General Conditions; and 4. Provide primary coverage for all claims covered by the policies, including those arising from both ongoing and completed operations. G. Purchase and maintain insurance coverage for third -party injury and property damage claims, including clean-up costs that result from Hazardous Environmental Conditions which result from Contractor's operations and completed operations. Provide Contractor's Insurance Requirements O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 007201-4 Rev 06-22-2016 pollution liability insurance that includes long-term environmental impacts for the disposal of pollutants/contaminants and is not limited to sudden and accidental discharge. The completed operations coverage is to remain in effect for 3 years after final payment. The policy must name OPT and any other individuals and entities identified in the Supplementary Conditions as additional insureds. H. Purchase and maintain applicable professional liability insurance, or have Subcontractors and Suppliers do so, if Contractor or any Subcontractor or Supplier will provide or furnish professional services under this Contract. I. The policies of insurance required by this Section must: 1. Include at least the specific coverages and be written for not less than the limits of liability provided in this Section or required by Laws or Regulations, whichever is greater. 2. Contain a provision that coverage afforded will not be canceled or materially changed until at least 30 days prior written notice has been given to Contractor, Owner, and all named insureds and additional insureds. 3. Remain in effect at all times when Contractor is performing Work or is at the Site to conduct tasks arising from the Contract Documents. 4. Be appropriate for the Work being performed and provide protection from claims resulting from the Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether performed by Contractor, Subcontractor, Supplier, anyone directly or indirectly employed or retained by any of them, or by anyone for whose acts they may be liable. J. The coverage requirements for specific policies of insurance must be met directly by those policies and may not rely on excess or umbrella insurance provided in other policies to meet the coverage requirement. 1.04 PROPERTY INSURANCE A. Purchase and maintain builder's risk insurance in the amount of the full replacement cost of the Project. This policy is subject to the deductible amounts requirements in this Section or those required by Laws and Regulations and must comply with the requirements of Paragraph 1.06. This insurance shall: 1. Include the OPT, Contractor, and all Subcontractors, and any other individuals or entities identified in the Supplementary Conditions, as named insureds. 2. Be written on a builder's risk "all risk" policy form that includes insurance for physical loss or damage to the Work, temporary buildings, falsework, and materials and equipment in transit, and insures against at least the following perils or causes of loss: fire; lightning; windstorm; riot; civil commotion; terrorism; vehicle impact; aircraft; smoke; theft; vandalism and malicious mischief; mechanical breakdown, boiler explosion, and artificially generated electric current; earthquake; volcanic activity, and other earth movement; flood; collapse; explosion; debris removal; demolition occasioned by enforcement of Laws and Regulations; water damage (other than that caused by flood); and such other perils or causes of loss as may be specifically required by this Section. If insurance against mechanical breakdown, boiler explosion, and Insurance Requirements O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 007201-5 Rev 06-22-2016 artificially generated electric current; earthquake; volcanic activity, and other earth movement; or flood, are not commercially available under builder's risk, by endorsement or otherwise, this insurance may be provided through other insurance policies acceptable to Owner and Contractor. 3. Cover expenses incurred in the repair or replacement of any insured property. 4. Cover materials and equipment in transit or stored prior to being incorporated in the Work. 5. Cover Owner -furnished or assigned property. 6. Allow for partial utilization of the Work by Owner. 7. Allow for the waiver of the insurer's subrogation rights as set forth below. S. Provide primary coverage for all losses and damages caused by the perils or causes of loss covered. 9. Not include a co-insurance clause. 10. Include a broad exception for ensuing losses from physical damage or loss with respect to any Defective workmanship, design, or materials exclusions. 11. Include testing and startup. 12. Be maintained in effect until the Work as a whole is complete, unless otherwise agreed to in writing by Owner and Contractor. B. Evidence of insurance provided must contain a provision or endorsement that the coverage afforded will not be canceled or materially changed or renewal refused until at least 30 days prior written notice has been given to Owner and Contractor and to each named insured. C. Pay for costs not covered by the policy deductible. D. Notify builder's risk insurance provider if Owner will occupy or use a portion or portions of the Work prior to Substantial Completion of all the Work as provided in Paragraph 15.04 of the General Conditions. Maintain the builder's risk insurance in effect during this Partial Occupancy or Use. E. Contractor may purchase other special insurance to be included in or to supplement the builder's risk or property insurance policies provided under this Section. F. Contractor, Subcontractors, or employees of the Contractor or a Subcontractor owning property items, such as tools, construction equipment, or other personal property not expressly covered in the insurance required by the Contract Documents are responsible for providing their own insurance. 1.05 WAIVER OF RIGHTS A. Insurance shall include a waiver of subrogation in favor of the additional insureds identified in SECTION 00 73 00 SUPPLEMENTARY CONDITIONS. B. All policies purchased in accordance with this Section are to contain provisions to the effect that the insurers have no rights of recovery against OPT, named insureds or additional insureds in the event of a payment for loss or damage. Contractor and insurers waive all Insurance Requirements 00 72 01 - 6 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev06-22-2016 rights against the Owner's Indemnities for losses and damages created by or resulting from any of the perils or causes of loss covered by these policies and any other applicable property insurance. None of these waivers extend to the rights Contractor has to the proceeds of insurance as trustee. C. Contractor is responsible for assuring that agreements with Subcontractors contains provisions that the Subcontractor waive all rights against Owner's Indemnitees, Contractor, named insureds and additional insureds, and the officers, directors, members, partners, employees, agents, consultants, and subcontractors of each and any of them, for all losses and damages created by or resulting from any of the perils or causes of loss covered by builder's risk insurance and other property insurance. 1.06 OWNER'S INSURANCE FOR THE PROJECT A. Owner is not responsible for purchasing and maintaining any insurance to protect the interest of the Contractor, Subcontractors, or others in the Work. The stated limits of insurance required are minimum only. Determine the limits that are adequate. These limits may be basic policy limits or any combination of basic limits and umbrella limits. In any event, Contractor is fully responsible for all losses arising out of, resulting from, or connected with operations under this Contract whether or not these losses are covered by insurance. The acceptance of evidence of insurance by the OPT, named insureds, or additional insureds does not release the Contractor from compliance with the insurance requirements of the Contract Documents. ARTICLE 2 — EVIDENCE OF INSURANCE 2.01 ACCEPTABLE EVIDENCE OF INSURANCE A. Provide evidence of insurance acceptable to the Owner with the executed Contract Documents. Provide the following as evidence of insurance: 1. Certificates of Insurance on an acceptable form; 2. Riders or endorsements to policies; and 3. Policy limits and deductibles. B. Provide a list of "Additional Insureds" for each policy. C. Provide evidence that waivers of subrogation are provided on all applicable policies. D. Provide evidence of requirements for 30 days' notice before cancellation or any material change in the policy's terms and conditions, limits of coverage, or change in deductible amount. 2.02 CERTIFICATES OF INSURANCE A. Submit Certificates of Insurance meeting the following requirements: 1. Form has been filed with and approved by the Texas Department of Insurance under Texas Insurance Code §1811.101; or 2. Form is a standard form deemed approved by the Department under Texas Insurance Code §1811.101. Insurance Requirements 00 72 01 - 7 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) RevO5-22-2016 3, No requirements of this Contract may be interpreted as requiring the issuance of a certificate of insurance on a certificate of insurance form that has not first been filed with and approved by the Texas Department of Insurance. B. Include the name of the Project in the description of operations box on the certificate of insurance. 2.03 INSURANCE POLICIES A. If requested by the Owner, provide a copy of insurance policies, declaration pages and endorsements, and documentation of applicable self-insured retentions and deductibles. B. Contractor may block out (redact) any proprietary information or confidential premium pricing information contained in any policy or endorsement furnished under this Contract. 2.04 CONTINUING EVIDENCE OF COVERAGE A. Provide updated, revised, or new evidence of insurance in accordance this Section prior to the expiration of existing policies. B. Provide evidence of continuation of insurance coverage at final payment and for the following 3 years. 2.05 NOTICES REGARDING INSURANCE A. Notices regarding insurance are to be sent to the Owner at the following address: City of Corpus Christi — Engineering Attn: Construction Contract Admin. P.O. Box 9277 Corpus Christi, TX 78469-9277 B. Submit questions regarding insurance requirements to the Construction Contract Administrator by calling 361-826-3530. ARTICLE 3 — TEXAS WORKERS' COMPENSATION INSURANCE REQUIRED NOTICE 3.01 WORKERS' COMPENSATION INSURANCE COVERAGE A. Definitions: 1. Certificate of coverage ("certificate") - A copy of a certificate of insurance, a certificate of authority to self -insure issued by the commission, ora coverage agreement (TWCC- 81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the Project. 2. Duration of the Project - includes the time from the beginning of the Work on the Project until the Contractor's/person's Work on the Project has been completed and accepted by the governmental entity. 3. Persons providing services on the Project ("Subcontractor" in §406.096) - includes all persons or entities performing all or part of the services the Contractor has undertaken to perform on the Project, regardless of whether that person contracted Insurance Requirements O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 007201-8 Rev 06-22-2016 directly with the Contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner -operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the Project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the Project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the Contractor providing services on the Project, for the duration of the Project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the Contract. D. If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the Project, the Contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project, and provide to the governmental entity: 1. A certificate of coverage, prior to that person beginning Work on the Project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the Project; and 2. No later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. F. The Contractor shall retain all required certificates of coverage for the duration of the Project and for one year thereafter. G. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the Project. H. The Contractor shall post on each Project Site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the Project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. I. The Contractor shall contractually require each person with whom it contracts to provide services on a project, to: 1. Provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the Project, for the duration of the Project; Insurance Requirements O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 007201-9 Rev 06-22-2016 2. Provide to the Contractor, prior to that person beginning Work on the Project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the Project, for the duration of the Project; 3. Provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; 4. Obtain from each other person with whom it contracts, and provide to the Contractor: a. A certificate of coverage, prior to the other person beginning Work on the Project; and b. A new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; 5. Retain all required certificates of coverage on file for the duration of the Project and for one year thereafter; 6. Notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the Project; and 7. Contractually require each person with whom it contracts, to perform as required by paragraphs (1) - (7), with the certificates of coverage to be provided to the person for whom they are providing services. J. By signing this Contract or providing or causing to be provided a certificate of coverage, the Contractor is representing to the governmental entity that all employees of the Contractor who will provide services on the Project will be covered by workers' compensation coverage for the duration of the Project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self -Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. K. The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the governmental entity to declare the Contract void if the Contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. END OF SECTION Insurance Requirements 00 72 01-10 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev06-22-2016 00 72 02 WAGE RATE REQUIREMENTS ARTICLE 1— PREVAILING WAGE RATE REQUIREMENTS 1.01 PAYMENT OF PREVAILING WAGE RATES A. Contractor and any Subcontractors employed on this Project shall pay not less than the rates established by the Owner as required by Texas Government Code Chapter 2258. B. Contractor is required to pay Davis -Bacon Wage Rates. 1.02 RECORDS A. In accordance with Tex. Gov't Code §2258.024, the Contractor and its Subcontractors, if any, shall keep a record showing: 1. The name and occupation of each worker employed by the Contractor or Subcontractor in the construction of the Work; and 2. The actual per diem wages paid to each worker. B. The record shall be open at all reasonable hours to inspection by the officers and agents of the Owner. 1.03 LIABILITY; PENALTY; CRIMINAL OFFENSE A. Tex. Gov't Code §2258.003 — Liability: An officer, agent, or employee of the Owner is not liable in a civil action for any act or omission implementing or enforcing Chapter 2258 unless the action was made in bad faith. B. Tex. Gov't Code §2258.053(b) — Penalty: Any Contractor or Subcontractor who violates the requirements of Chapter 2258, shall pay to the Owner, on whose behalf the Contract is made, $60 for each worker employed or each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the Contract. C. Tex. Gov't Code §2258.058 — Criminal Offense: 1. An officer, agent, or representative of the Owner commits an offense if the person willfully violates or does not comply with a provision of Chapter 2258. 2. Any Contractor or Subcontractor, or an agent or representative of the Contractor or Subcontractor, commits an offense if the person violates Tex. Gov't Code §2258.024. 3. An offense is punishable by: a. A fine not to exceed $500; b. Confinement in jail for a term not to exceed 6 months; or c. Both a fine and confinement. 1.04 PREVAILING WAGE RATES A. The minimum rates for various labor classifications as established by the Owner are shown below: Wage Rate Requirements 00 72 02 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) REV 06-12-2015 Wage Determination Construction Type Project Type (WD) No TX -31 Heavy Heavy Construction Projects (including Sewer and Water Line Construction and Drainage Projects) TX -75 Heavy Dredging projects along the Texas gulf coast area including all public channels, harbors, rivers, tributaries and the Gulf Intracoastal Waterways. Wage Rate Requirements 00 72 02 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) REV 06-12-2015 General Decision Number: TX160031 01/08/2016 TX31 Superseded General Decision Number: TX20150031 State: Texas Construction Type: Heavy Counties: Nueces and San Patricia Counties in Texas. HEAVY CONSTRUCTION PROJECTS (including Sewer and Water Line Construction and Drainage Projects) Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.15 for calendar year 2016 applies to all contracts subject to the Davis -Bacon Act for which the solicitation was issued on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/08/2016 * 5UTH1987-001 12/01/1987 Rates Fringes CARPENTER (Excluding Form Setting) $ 9.05 Concrete Finisher $ 7.56 ELECTRICIAN $ 13.37 Laborers: Common $ 7.25 Utility $ 7.68 Power equipment operators: Backhoe $ 9.21 Motor Grader $ 8.72 2.58 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii)). http.fiwww.wdd.gw wdol/scaflesklavlsbecanMC31.dvb?v=0 1/4 Wage Rate Requirements 00 72 02 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) REV 06-12-2015 The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-00S 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union MOAMrcow.%WolywhnloVscallesklavislxxo M 31.1Wv=0 214 Wage Rate Requirements 00 72 02 - 4 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) REV 06-12-2015 average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in 7anuary of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests Tor summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis -Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: MlpAhvww.wdol.gwlwdollsca111esldavisbacavTX31.dvb?v=0 3Y4 Wage Rate Requirements 00 72 02 - 5 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) REV 06-12-2015 11/8/2016 www.wdd.gwhvdd/ cafles/devisbacan/TX31.dvb7v=0 Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. END OF GENERAL DECISION Mtp-/Arww.wdd.godwdal/scafiiashlavisbacaVTX31.d+&t7v=0 414 Wage Rate Requirements 00 72 02 - 6 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) REV 06-12-2015 11/802016 www.wdd.gwhvdd/ cafles/devisbaca TX75.dvb7v=0 General Decision Number: TH160075 01/08/2016 TH75 Superseded General Decision Number: TH20150075 State: Texas Construction Type: Heavy Dredging Counties: Texas Statewide. DREDGING PROTECTS ALONG THE TEXAS GULF COAST AREA INCLUDING ALL PUBLIC CHANNELS, HARBORS, RIVERS, TRIBUTARIES AND THE GULF INTRACOASTAL WATERWAYS Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.1S for calendar year 2016 applies to all contracts subject to the Davis -Bacon Act for which the solicitation was issued on or after 7anuary 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.15 (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2016. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/08/2016 * 5UTX1994-001 01/18/1994 Rates Derrick Operator $ 7.25 Dozer Operator $ 7.25 Dredge 16" and Over DECKHAND $ 7.25 DREDGE TENDER OPERATOR $ 7.25 FIREMAN $ 7.25 FIRST ASSISTANT ENGINEER$ 7.25 LEVERMAN $ 7.25 OILER $ 7.25 SECOND ASSISTANT ENGINEER$ 7.25 SHOREMAN $ 7.25 THIRD ASSISTANT ENGINEER$ 7.25 TRUCK DRIVER $ 7.25 WELDER $ 7.25 Dredge Under 16" DECKHAND $ 7.25 DREDGE TENDER OPERATOR $ 7.25 LEVERMAN $ 7.25 OILER $ 7.25 WELDER $ 7.25 Hydraulic Dredging Fringes MVAWww.wdd.godwdzilheAiiesldarisbecataX75.d,Wv=0 114 Wage Rate Requirements 00 72 02 - 7 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) REV 06-12-2015 11/802016 www.wdd.govtvdd/ caMes/daMsbacai/TX75.dvb?v=0 FIRST COOK $ 7.25 HANDYMAN $ 7.25 JANITOR - CABIN PERSON $ 7.25 MESS PERSON $ 7.25 SECOND COCK $ 7.25 Marsh Buggy Dragline OILER $ 7.25 OPERATOR $ 7.25 WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR S. (a) (1) (ii)). The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate). Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "5U" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM8148-805 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that My lhrww.wdd.godwdol/scatiesklavisbacat/TX75.Wv=0 2/4 Wage Rate Requirements 00 72 02 - 8 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) REV 06-12-2015 11/82016 www.wdd.gorrwddlscafoles/davishacdVfX75.dvh?v=0 classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 S/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-04-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: an existing published wage determination * a survey underlying a wage determination • a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis -Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor Mr/Amyx wdd goviwdllscafleslevishacenf X75.dut?v=0 314 Wage Rate Requirements 00 72 02 - 9 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) REV 06-12-2015 11/802016 www.wdoLgaitaddtscafilesideMsbaccri/TX75.d/b7v=0 200 Constitution Avenue, N.W. Washington, DC 2.0219 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) A11 decisions by the Administrative Review Board are final. END OF GENERAL DECISION MtpJArww.wdd.godwdal/scelevtiovisbacuVTX75.ctut?v=0 4/4 END OF SECTION Wage Rate Requirements 00 72 02 -10 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) REV 06-12-2015 00 72 03 MINORITY / MBE / DBE PARTICIPATION POLICY ARTICLE 1— PARTICIPATION POLICY 1.01 POLICY A. It is the policy of the City of Corpus Christi that maximum opportunity is afforded minorities, women, and Minority Business Enterprises (MBE) to participate in the performance of contracts awarded by the City of Corpus Christi in support of Equal Employment Opportunity goals and objectives of the Affirmative Action Policy Statement of the City dated October 1989, and any amendments thereto. In accordance with such policy, the City has established goals, as stated herein, both for minority and female participation by trade and for Minority Business Enterprise. 1.02 DEFINITIONS A. Prime Contractor: Any person, firm, partnership, corporation, association, or joint venture as herein provided which has been awarded a City contract. B. Subcontractor: Any named person, firm, partnership, corporation, association, or joint venture as herein identified as providing work, labor, services, supplies, equipment, materials, or any combination of the foregoing under contract with a prime contractor on a City contract. C. Minority Business Enterprise: A business enterprise that is owned and controlled by one or more minority person(s). Minority person(s) must collectively own, operate and/or actively manage, and share in payments from such an enterprise in the manner hereinafter set forth: 1. Owned: a. For a sole proprietorship to be deemed a minority business enterprise, it must be owned by a minority person. b. For an enterprise doing business as a partnership, at least 51 percent of the assets or interest in the partnership property must be owned by one or more minority person(s). c. For an enterprise doing business as a corporation, at least 51 percent of the assets or interest in the corporate shares must be owned by one or more minority person(s). 2. Controlled: a. The primary power, direct or indirect, to manage a business enterprise rests with a minority person(s). 3. Share in Payments: a. Minority partners, proprietors, or stockholders of the business enterprise, must be entitled to receive 51 percent or more of the total profits, bonuses, dividends, interest payments, commissions, consulting fees, rents, procurement, and subcontract payments, and any other monetary distribution paid by the business enterprise. Minority / MBE / DBE Participation Policy 00 72 03 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 D. Minority: Minority persons include Blacks, Mexican -Americans and other persons of Hispanic origin, American Indians, Alaskan Natives, and Asians or Pacific Islanders. For the purposes of this policy, women are also considered as minorities. E. Female Owned Business Enterprise: A sole proprietorship that is owned and controlled by a woman, a partnership at least 51 percent of whose assets or partnership interests are owned by one or more women, or a corporation at least 51 percent of whose assets or interests in the corporate shares are owned by one or more women. F. Joint Venture: A joint venture means an association of two or more persons, partnerships, corporations, or any combination thereof, founded to carry on a single business activity which is limited in scope and direction. The degree to which a joint venture may satisfy the stated MBE goal cannot exceed the proportionate interest of the MBE as a member of the joint venture in the Work to be performed by the joint venture. For example, a joint venture which is to perform 50 percent of the Work itself and in which a minority joint venture partner has a 50 percent interest, shall be deemed equivalent to having minority participation in 25 percent of the Work. Minority members of the joint venture must have financial, managerial, or technical skills in the Work to be performed by the joint venture. 1.03 GOALS A. The goals for participation by minorities and Minority Business Enterprises expressed in percentage terms for the Contractor's aggregate work force on all construction Work for the Contract award shall be as specified in SECTION 00 21 13 INVITATION TO BID AND INSTRUCTIONS TO BIDDERS. B. These goals are applicable to all the construction work (regardless of federal participation) performed in the Contract, including approved Change Orders. The hours of minority employment must be substantially uniform throughout the length of the Contract and in each trade. The transfer of minority employees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's percentage is prohibited. 1.04 COMPLIANCE A. Upon completion of the Project, a final breakdown of MBE participation, substantiated by copies of paid invoices, shall be submitted by the Contractor to the City Engineer. B. Make bi-weekly payroll submittals to the City Engineer. The Contractor is to indicate the percent of minority and female participation, by trade, which has been utilized on the Project. Along with the request for final payment on the Project, the Contractor will indicate, in writing, the overall participation in these areas which have been achieved. The City Engineer may withhold monthly or final payments to the Contractor for failure to submit bi-weekly payrolls in a timely fashion or to submit overall participation information as required. END OF SECTION Minority / MBE / DBE Participation Policy 00 72 03 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 00 73 00 SUPPLEMENTARY CONDITIONS These Supplementary Conditions amend or supplement SECTION 00 72 00 GENERAL CONDITIONS and other provisions of the Contract Documents. All provisions not amended or supplemented in these Supplementary Conditions remain in effect. The terms used in these Supplementary Conditions have the meanings stated in the General Conditions. Additional terms used in these Supplementary Conditions have the meanings stated below. ARTICLE 1— DEFINITIONS AND TERMINOLOGY SC -1.01 DEFINED TERMS A. Delete the last sentence in Paragraph 1.01.A.26 and replace with the following: "Designers are Licensed Professional Engineers, Registered Architects, or Registered Landscape Architects qualified to practice their profession in the State of Texas." B. The members of the OPT as defined in Paragraph 1.01.A.41 consists of the following organizations: City of Corpus Christi, Texas C. The following entities, along with the members of the OPT, are to be named as an additional insured on all insurance policies, except workers compensation insurance and the Contractor's professional liability insurance. Paragraph 1.01.A.54 "Substantial Completion" is more specifically defined for this Project as: 1. The following items are fully functional and suitable for operation in accordance with the Contract Documents: a. 95% of the Contract Total Quantity of Dry Tons has been removed from the Project Site 2, Only the following items not yet complete in accordance with the Contract Documents: a. Remaining 5% of the Contract Total Quantity of Dry Tons, Site cleanup, demobilization, record drawings, as applicable, Final punchlist, Final Pay Request and Final Closeout documentation. Supplementary Conditions 00 73 00 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 ARTICLE 4 — COMMENCEMENT AND PROGRESS OF THE WORK SC -4.04 DELAYS IN CONTRACTOR'S PROGRESS A. The allocation for delays in the Contractor's progress for rain days as set forth in General Conditions Paragraph 4.04.D are to be determined as follows: 1. Include rain days in developing the schedule for construction. Schedule construction so that the Work will be completed within the Contract Times assuming that these rain days will occur. Incorporate residual impacts following rain days such as limited access to and within the Site, inability to work due to wet or muddy Site conditions, delays in delivery of equipment and materials, and other impacts related to rain days when developing the schedule for construction. Include all costs associated with these rain days and residual impacts in the Contract Price. 2. A rain day is defined as any day in which the amount of rain measured by the National Weather Services at the Power Street Stormwater Pump Station is 0.50 inch or greater. Records indicate the following average number of rain days for each month: Month Days Month Days January 3 July 3 February 3 August 4 March 2 September 7 April 3 October 4 May 4 November 3 June 4 December 3 3. A total of 43 rain days have been set for this Project. An extension of time due to rain days will be considered only after 43 rain days have been exceeded during the execution of this project and the OAR has determined that a detrimental impact to the construction schedule resulted from the excessive rainfall. Rain days are to be incorporated into the schedule and unused rain days will be considered float time which may be consumed by the Owner or Contractor in delay claims. ARTICLE 5 — AVAILABILITY OF LANDS; SUBSURFACE CONDITIONS AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS SC -5.03 SUBSURFACE AND PHYSICAL CONDITIONS 1. None 2. None A. No reports of explorations or tests of subsurface conditions at or contiguous to the Site, or drawings of physical conditions relating to existing surface or subsurface structures at the Site, are known to Owner." "5.06 Hazardous Environmental Conditions at Site A. No reports of explorations or tests for Hazardous Environmental Conditions at or contiguous to the Site are known to Owner." Supplementary Conditions 00 73 00 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 ARTICLE 7 — CONTRACTOR'S RESPONSIBILITIES SC -7.04 CONCERNING SUBCONTRACTORS, SUPPLIERS, AND OTHERS A. Add the following sentence to the end of Paragraph 7.04.A: "The Contractor must perform at least [50] percent of the Work, measured as a percentage of the Contract Price, using its own employees." END OF SECTION Supplementary Conditions 00 73 00 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 01 11 00 SUMMARY OF WORK 1.00 GENERAL 1.01 WORK INCLUDED A. Construct Work as described in the Contract Documents. 1. Provide the materials, equipment, and incidentals required to make the Project completely and fully useable. 2. Provide the labor, equipment, tools, and consumable supplies required for a complete Project. 3. The Contract Documents do not indicate or describe all of the Work required to complete the Project. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the OAR. 1.02 DESCRIPTION OF WORK A. Work is described in general, non-inclusive terms as: The project generally consists of dredging, dewatering (as necessary), hauling and delivering to disposal site, water treatment plant residuals (sludge) from an existing storage lagoon. The residuals will be dredged from Lagoon No. 7 (Washwater Return Basin) located on-site at O.N. Stevens Water Treatment Plant, 13101 Leopard Street, Corpus Christi, Texas (ONSWTP). The residuals will be hauled to and disposed of at Cefe Valenzuela Landfill, 2397 Co. Rd. 20, Robstown, TX. 78380, owned by the City of Corpus Christi (approximately 20 miles from ONSWTP). The Contractor will be responsible for conducting and providing documentation of trip tickets, manifests, and paint filter tests for each load at the point of generation, moisture content tests for each load, and TCLP and TPH tests for every 25,000 CY disposed of at the landfill. The contractor will NOT be responsible for tipping fees at the Cefe Valenzuela Landfill. Existing site access and paved staging area will be available for Contractor use. Contractor will be responsible for maintaining access in a condition that is suitable for their own use. The Contractor will not be responsible for restoring the access or staging area to its existing condition. The access points and staging areas are indicated on the plans. The initial base contract will be for a one (1) year (12 -calendar months) and approximately $4M with one (1) optional one (1) year (12 -calendar months) renewal for an additional $4M based on Contractor's successful performance, approval by the City/Engineer and concurrence from the Contractor. The total estimated quantity of residuals to be removed during the base contract is 10,000 dry tons (DT). 1.03 WORK UNDER OTHER CONTRACTS A. The following items of work are not included in this Contract, but may impact construction scheduling and completion: 1. D.N. Stevens Water Treatment Plant High Service Pump Building No. 3 Summary of Work 01 1100 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 City Project No. E11066 2. Q.N. Stevens Water Treatment Plant Raw Water Influent Improvements and Facilities Feed Optimization City Project No. 8643 and 8605 3. ONSWTP Facilities Feed Optimization Improvements - Fluoride City Project No. E15233 4. D.N. Stevens Water Treatment Plant Maintenance Building City Project No. 8643 B. In the case of a disagreement between the above list and those specified elsewhere in the Contract Documents, the Contractor is to base his Proposal on the most expensive listing. C. Completion of the Work described in this Contract may impact the construction and testing of the items listed above. 1. Coordinate construction activities through the OAR. 2. Pay claims for damages which result from the late completion of the Project or any specified Milestones. 1.04 WORK BY OWNER A. The Owner plans to perform the following items of work which are not included in this Contract, but may impact the construction scheduling and completion: 1. None B. Completion of the Work described in this Contract may impact the construction of the items listed above. 1. Coordinate construction activities through the OAR. 2. Pay claims for damages which result from the late completion of the Project or any specified Milestones. C. Owner will provide normal operation and maintenance of the existing facilities during construction, unless otherwise stated. 1.05 CONSTRUCTION OF UTILITIES A. Pay for temporary power, including but not limited to construction cost, meter connection fees, and permits. 1.06 USE PRIOR TO FINAL COMPLETION A. Owner has the right to use or operate any portion of the Project that is ready for use after notifying the Contractor of its intent to do so. B. The execution of Bonds is understood to indicate the consent of the surety to these provisions for use of the Project. C. Provide an endorsement from the insurance carrier permitting use of Project during the remaining period of construction. Summary of Work 01 1100 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 D. Conduct operations to insure the least inconvenience to the Owner and general public. 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Summary of Work 01 1100 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 01 23 10 ALTERNATES AND ALLOWANCES 1.00 GENERAL 1.01 REQUIREMENTS A. Alternates: 1. This Section describes each alternate by number and describes the basic changes to be incorporated into the Work when this alternate is made a part of the Work in the Agreement. 2. Drawings and Specifications will outline the extent of Work to be included in the alternate Contract Price. 3. Coordinate related Work and modify surrounding Work as required to properly integrate the Work under each alternate, and provide a complete and functional Project as required by the Contract Documents. 4. Bids for alternates may be accepted or rejected at the option of the Owner. 5. Owner may incorporate these alternates in the Contract when executed, or may issue a Change Order to incorporate these alternates within 120 days at the prices offered in the Bid, unless noted otherwise. A Request for a Change Proposal may be issued after 120 days or other designated time period to negotiate a new price for incorporating the Work into the Project. B. Allowances: 1. Include specified allowance amount in the Contract Price. 2. The amount of each allowance includes: a. The cost of the product to the Contractor less any applicable trade discounts. b. Delivery to the Site. c. Applicable taxes. 3. Include in the Contract Price all costs for: a. Handling at the Site, including unloading, uncrating, and storage per SECTION 01 3100 PROJECT MANAGEMENT AND COORDINATION. b. Cost for labor and equipment for installation and finishing. c. Cost for related products not specifically listed in the allowance required for installation, including consumable supplies and materials. d. All overhead, profit, and related costs. 4. Assist Owner in the selection of products. a. Identify qualified Suppliers. b. Obtain bids from qualified Suppliers. c. Present available alternates to the Owner through the OAR. Notify OAR of: 1) Any objections to a particular Supplier or product. Alternates and Allowances 0123 10 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 2) Effect on the Construction Schedule anticipated by the selection of each option. 3) Cost of each option. 5. Upon selection of the product: a. Purchase and install the product. b. Contractor's responsibilities for products shall be the same as for products selected by the Contractor. 6. Submit a Change Proposal per SECTION 01 31 14 CHANGE MANAGEMENT to adjust Contract Price if the net cost of the product is more or less than the specified amount. a. Adjust the unit cost applied to the quantities installed per the method of payment described in SECTION 0129 00 APPLICATION FOR PAYMENT PROCEDURES for products specified as Unit Price Work. b. Do not perform Work until selection of alternate has been approved by the Owner. c. Provide actual invoices for the materials. 1.02 DOCUMENT SUBMITTALS A. Provide documents for materials furnished as part of the alternate in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT. 1.03 DESCRIPTION OF ALTERNATES (NOT USED) 1.04 DESCRIPTION OF ALLOWANCES (NOT USED) 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Alternates and Allowances O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 012310-2 11-25-2013 01 29 00 APPLICATION FOR PAYMENT PROCEDURES 1.00 GENERAL 1.01 WORK INCLUDED A. Submit Applications for Payment for completed Work and for materials and equipment in accordance with the General Conditions, the Supplementary Conditions, the Agreement, and this Section. The Contract Price is to include costs for: 1. Providing the Work in accordance with the Contract Documents; 2. Installing Owner furnished equipment and materials; 3. Providing Work for Alternates and Allowances; 4. Commissioning, start-up, training and initial maintenance and operation; 5. Acceptance testing in manufacturer's facilities or on Site; 6. All home office overhead costs and expenses, including profit made directly or indirectly for the Project; 7. Project management, Contract administration, field office, and field operations staff, including supervision, clerical support, and technology system support; 8. Professional services including design fees, legal fees, and other professional services; 9. Bonds and insurance; 10. Permits, licenses, patent fees, and royalties; 11. Taxes; 12. Providing all documents and Samples required by the Contract Documents; 13. Facilities and equipment at the Site including: a. Field offices, office furnishings, and all related office supplies, software, and equipment, b. Storage facilities for Contractor's use, storage facilities for stored materials and equipment, including spare parts storage, c. Shops, physical plant, construction equipment, small tools, vehicles, technology and telecommunications equipment, d. Safety equipment and facilities to provide safe access and working conditions for workers and for others working at the Site, e. Temporary facilities for power and communications, f. Potable water and sanitation facilities, and g. Mobilization and demobilization for all of these facilities and equipment; 14. Products, materials, and equipment stored at the Site or other suitable location; 15. Products, materials, and equipment permanently incorporated into the Project; Application for Payment Procedures 01 29 00 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 03-11-2015 16. Temporary facilities for managing water, including facilities for pumping, storage, and treatment as required for construction and protection of the environment; 17. Temporary facilities for managing environment conditions and Constituents of Concern; 18. Temporary facilities such as sheeting, shoring, bracing, formwork, embankments, storage facilities, working areas, and other facilities required for construction of the Project; 19. Temporary and permanent facilities for protection of all overhead, surface, or underground structures or features; 20. Temporary and permanent facilities for removal, relocation, or replacement of any overhead, surface, or underground structures or features; 21. Products, materials, and equipment consumed during the construction of the Project; 22. Contractor labor and supervision to complete the Project, including that provided through Subcontractors or Suppliers; 23. Correcting Defective Work during the Contract Times, during the Correction Period, or as required to meet any warranty provision of the Contract Documents; 24. Risk associated with weather and environmental conditions, start-up, and initial operation of facilities including equipment, processes, and systems; 25. Contractor's safety programs, including management, administration, and training; 26. Maintenance of facilities, including equipment, processes, and systems until operation is transferred to Owner; 27. Providing warranties, extended or special warranties, or extended service agreements; 28. Cleanup and disposal of any and all surplus materials; and 29. Demobilization of all physical, temporary facilities not incorporated into the Project. B. Include the cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the Contract Price. C. Provide written approval of the surety company providing Bonds for the Schedule of Values, Application for Payment form, and method of payment prior to submitting the first Application for Payment. Submit approval using the Consent of Surety Company to Payment Procedures form provided. Payment will not be made without this approval. D. OAR may withhold processing Applications for Payment if any of the following processes or documentation are not up to date: 1. Progress Schedule per SECTION 0133 04 CONSTRUCTION PROGRESS SCHEDULE. 2. Project photographs per SECTION 0133 05 VIDEO AND PHOTOGRAPHIC DOCUMENTATION. 3. Record Documents per SECTION 0131 13 PROJECT COORDINATION. 4. Documentation required to comply with Owner's Minority / MBE / DBE Participation Policy. Application for Payment Procedures 01 29 00 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 03-11-2015 1.02 SCHEDULE OF VALUES A. Submit a detailed Schedule of Values for the Work at least 10 days prior to submitting the first Application for Payment. B. Submit the Schedule of Values in the form for Attachment A - Tabulation of Earned Value of Original Contract Performed. C. Do not submit an Application for Payment until the Schedule of Values has been approved by the OAR. D. Use each unit price line item in the Agreement as a unit price line item in the Schedule of Values. E. Divide lump sum line items, including Subcontractor and Supplier amounts in the Schedule of Values into smaller components to allow more accurate determination of the earned value for each item. 1. Provide adequate detail to allow a more accurate determination of the earned value expressed as a percentage of Work completed for each item. 2. Line items may not exceed $50,000.00, unless they are for products, materials, or equipment permanently incorporated into the Project that cannot be subdivided into units or subassemblies. 3. Lump sum items may be divided into an estimated number of units to determine earned value. a. The estimated number of units times the cost per unit must equal the lump sum amount for that line item. b. Contractor will receive payment for the lump sum for the line item, regardless of the number of units installed, unless an adjustment is made by Change Order. 4. Include Contractor's overhead and profit in each line item in proportion to the value of the line item to the Contract Price. 5. Include the cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the Contract Price for each item. 6. These line items may be used to establish the value of Work to be added or deleted from the Project. 7. The sum of all values listed in the schedule must equal the total Contract Price. F. Subdivide each line item in the Schedule of Values into two payment components. The first component is the direct cost for products, materials, and equipment permanently incorporated into the Project. The second component is all other cost associated with the item in the Agreement. The sum of the two components must equal the value of the line item in the Schedule of Values. G. Where a percentage of the line value is allowed for a specified stage of completion, show the value for each stage of completion as a component of that line item cost. Application for Payment Procedures 01 29 00 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 03-11-2015 1.03 SCHEDULE OF ANTICIPATED PAYMENTS AND EARNED VALUE A. Submit a schedule of the anticipated Application for Payments showing the application numbers, submission dates, and the anticipated amount to be requested. Incorporate retainage into the development of this schedule of anticipated payments. B. Submit a tabulation of the anticipated Total Earned Value of Fees, Work, and Materials to create a graphic (curve) representation of the anticipated progress on the Project each month. Adjust this table and curve to incorporate Modifications. Use this curve to compare actual progress on the Project each month by comparing the anticipated cumulative Total Earned Value of Fees, Work, and Materials to the actual Total Earned Value of Fees, Work, and Materials each month. Use the comparison of values to determine performance on budget and schedule. C. Update the Schedule of Payments as necessary to provide a reasonably accurate indication of the funds required to make payments each month to the Contractor for Work performed. 1.04 BASIS FOR PAYMENTS A. Lump Sum Contracts: 1. Payment will be made for the earned value of Work completed during the payment period expressed as a percentage of Work completed for each line item during the payment period per the Contract Documents. 2. Payment amount is the value of Work completed per the Contract Documents multiplied by the percentage of Work completed. 3. Payment for lump sum items divided into an estimated number of units to determine earned value per Paragraph 1.02.E.3 will be made for the measured number of units. 4. Payment for stored materials and equipment will be made per Paragraph 1.05. B. Unit Price Contracts: 1. Payment will be made for the actual quantity of Work completed during the payment period and for materials and equipment stored during the payment period per the Contract Documents. a. Payment amount is the Work quantity measured per the Contract Documents multiplied by the unit prices for that line item in the Agreement. b. Payment for stored materials and equipment will be made per Paragraph 1.05. 2. Measure the Work described in the Agreement for payment. Payment will be made only for the actual measured and/or computed length, area, solid contents, number, and weight, unless other provisions are made in the Contract Documents. Payment on a unit price basis will not be made for Work outside finished dimensions shown in the Contract Documents. Include cost for waste, overages, and tolerances in the unit price for that line item. 1.05 PAYMENT FOR STORED MATERIALS AND EQUIPMENT. A. Store materials and equipment properly at the Site. Application for Payment Procedures 01 29 00 - 4 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 03-11-2015 1. Payment will be made for the invoice amount less the specified retainage. 2. Payment for materials and equipment show in the Application for Payment on Attachment A or Attachment B - Tabulation of Work on Approved Contract Modifications will be made for the invoice amount, up to the value show in the Schedule of Values for that line item. Costs for material and equipment in excess of the value shown in the Schedule of Values may not be added to other line items. 3. Payment will be made in full for the value shown in the line item for products and materials if invoices for materials and equipment are less than the amount shown in the line item and it can be demonstrated that no additional materials or equipment are required to complete Work described in that item. 4. Provide invoices at the time materials are included on Attachment D - Tabulation of Values for Materials and Equipment. Include invoice numbers on Attachment D so that a comparison can be made between invoices and amounts included on Attachment D. B. Provide a bill of sale, invoice, or other documentation warranting that Owner has received the materials and equipment free and clear of Liens. Provide documentation of payment for materials and equipment with the next Application for Payment. Adjust payment to the amount actually paid if this differs from the invoice amount. Remove items from the tabulation of materials and equipment if this documentation is not provided. Payment will not be made for material and equipment without documentation of payment. C. Contractors can be paid for non-perishable materials on hand stored at the site, provided that invoices are furnished to the City for verification of the material value; and provide documents, satisfactory to the City, that show that the material supplier has been paid for the materials delivered to the work site. D. Provide evidence that the materials and equipment are covered by appropriate property insurance or other arrangements to protect Owner's interest. E. The Work covered by progress payments becomes the property of the Owner at the time of payment. The Contractor's obligations with regard to proper care and maintenance, insurance, and other requirements are not changed by this transfer of ownership until accepted in accordance with the General Conditions. F. Payment for materials and equipment does not constitute acceptance of the product. 1.06 ALTERNATES AND ALLOWANCES A. Include amounts for specified Alternate Work in the Agreement in accordance with SECTION 01 23 10 ALTERNATES AND ALLOWANCES. B. Include amounts for specified Allowances for Work in the Agreement in accordance with SECTION 01 23 10 ALTERNATES AND ALLOWANCES. 1.07 RETAINAGE AND SET -OFFS A. Retainage will be withheld from each Application for Payment per the Agreement. Retainage will be released per the General Conditions. Application for Payment Procedures 01 29 00 - 5 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 03-11-2015 B. Reduce payments for set -offs per the General Conditions. Include Attachment C — Tabulation of Set -Offs in the Application for Payment. 1.08 PROCEDURES FOR SUBMITTING AN APPLICATION FOR PAYMENT A. Submit a draft Application for Payment to the OAR each month at least 20 days before the date established in the Agreement for Owner to make progress payments. Do not submit Applications for Payment more often than monthly. Review the draft Application for Payment with the OAR to determine concurrence with: 1. The earned value for each lump sum item including the value of properly stored and documented materials and equipment for each item in the original Contract. 2. The quantity of Work completed for each unit price item. 3. Set -offs included in the Application for Payment. 4. Values requested for materials and equipment consistent with invoices for materials and equipment. B. Submit Applications for Payment monthly through the OAR after agreement has been reached on the draft Application for Payment. 1. Number each application sequentially and include the dates for the application period. 2. Show the total amounts for earned value of original Contract performed, earned value for Work on approved Contract Amendments and Change Orders, retainage, and set- offs. Show total amounts that correspond to totals indicated on the attached tabulation for each. 3. Include Attachment A to show the earned value on each line item in the Schedule of Values for Work shown in the original Contract. 4. Include Attachment B to show the earned value on line item for approved Change Orders. Add items to Attachment B as Change Orders are approved. Change Orders must be approved before payment can be made on Change Order items. 5. Include Attachment C to document set -offs required per the Contract Documents. Show each set-off as it is applied. Show a corresponding line item to reduce the Set off amount if a payment held by a set-off is released for payment. 6. Include Attachment D to allow tracking of invoices used to support amounts requested as materials in Attachments A and B. Enter materials to show the amount of the invoice assigned to each item in Attachment A or B if an invoice includes materials used on several line items. 7. Complete the certification stating that all Work, including materials and equipment, covered by this Application for Payment have been completed or delivered and stored in accordance with the Contract Documents, that all amounts have been paid for Work, materials, and equipment for which previous payments have been made by the Owner, and that the current payment amount shown in this Application for Payment is now due. Application for Payment Procedures 01 29 00 - 6 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 03-11-2015 C. Submit attachments in Portable Document Format (PDF): 1. Generate attachments to the Application for Payment using the Excel spreadsheet provided. 2. Submit PDF documents with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. 1.09 RESPONSIBILITY OF OWNER'S AUTHORIZED REPRESENTATIVE A. OAR will review draft Application for Payment with Contractor to reach an agreement on the values that will be recommended for payment by the OAR. B. OAR will review Application for Payment submitted by Contractor to determine that the Application for Payment has been properly submitted and is in accordance with the agreed to draft Application for Payment. C. OAR is to either recommend payment of the Application for Payment to Owner or notify the Contractor of the OPT's reasons for not recommending payment. Contractor may make necessary corrections and resubmit the Application for Payment if it is not recommended within 10 days after receipt of the notice. OAR will review resubmitted Application for Payment and reject or recommend payment of the Application for Payment to Owner as appropriate. D. OAR's recommendation of the Application for Payment constitutes a representation by OPT that based on their experience and the information available: 1. The Work has progressed to the point indicated; 2. The quality of the Work is generally in accordance with the Contract Documents; and 3. Requirements prerequisite to payment have been met. E. This representation is subject to: 1. Further evaluation of the Work as a functioning whole; 2. The results of subsequent tests called for in the Contract Documents; or 3. Any other qualifications stated in the recommendation. F. OPT does not represent by recommending payment: 1. Inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work; or 2. Other matters or issues between the parties that might entitle Contractor to additional compensation or entitle Owner to withhold payment to Contractor may or may not exist. G. Neither OPT's review of Contractor's Work for the purposes of recommending payments nor OAR's recommendation of payment imposes responsibility on OPT: 1. To supervise, direct, or control the Work; Application for Payment Procedures 01 29 00 - 7 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 03-11-2015 2. For the means, methods, techniques, sequences, or procedures of construction, or safety precautions and programs; 3. For Contractor's failure to comply with Laws and Regulations applicable to Contractor's performance of the Work; 4. To make examinations to ascertain how or for what purposes Contractor has used the monies paid on account of the Contract Price; or 5. To determine that title to the Work, materials, or equipment has passed to Owner free and clear of Liens. 1.10 FINAL APPLICATION FOR PAYMENT A. Include adjustments to the Contract Price in the final Application for Payment for: 1. Approved Change Orders and Contract Amendments, 2. Allowances not previously adjusted by Change Order, 3. Deductions for Defective Work that has been accepted by the Owner, 4. Penalties and bonuses, 5. Deductions for liquidated damages, 6. Deduction for all final set -offs, and 7. Other adjustments if needed. B. OAR will prepare a final Change Order reflecting the approved adjustments to the Contract Price which have not been covered by previously approved Change Orders and if necessary reconcile estimate unit price quantities with actual quantities. C. Submit the final Application for Payment per the General Conditions, including the final Change Order. Provide the following with the Final Application for Payment: 1. Evidence of payment or release of liens on the forms provided and as required by the General Conditions. 2. Consent from Surety to Final Payment. 1.11 PAYMENT BY OWNER A. Owner is to pay the amount recommended for monthly payments within 30 days after receipt of the OAR's recommended Application for Payment. 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Application for Payment Procedures 01 29 00 - 8 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 03-11-2015 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT 1.00 GENERAL 1.01 MEASUREMENT AND BASIS FOR PAYMENTS ON LUMP SUM ITEMS A. Include all cost for completing the Work in accordance with the Contract Documents for lump sum payment items. Include all direct cost for the Work associated with that lump sum item and a proportionate amount for the indirect costs as described in SECTION 01 29 00 APPLICATION FOR PAYMENT PROCEDURES for each lump sum item. Include cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the lump sum price. B. Measurement for progress payments will be made on the basis of the earned value for each item shown as a percentage of the cost for the lump sum item as described in SECTION 01 29 00 APPLICATION FOR PAYMENT PROCEDURES. Payment at Final Completion will be equal to the total lump sum amount for that item. 1.02 MEASUREMENT AND BASIS FOR PAYMENTS ON UNIT PRICE ITEMS A. Include all cost for completing the Work in accordance with the Contract Documents in unit price payment items. Include all direct cost for the Work associated with that unit price item and a proportionate amount for the indirect costs as described in SECTION 0129 00 APPLICATION FOR PAYMENT PROCEDURES for each unit price item. Include cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the unit price. B. Measurement for payments will be made only for the actual measured and/or computed length, area, solid contents, number, and weight, unless other provisions are made in the Contract Documents. Payment on a unit price basis will not be made for Work outside finished dimensions shown in the Contract Documents. Include cost for waste, overages, and tolerances in the unit price for that line item. Measurement will be as indicated for each unit price item. 1.03 MEASUREMENT AND BASIS FOR PAYMENT FOR BASE BID ITEMS A. Bid Item A-1 - Mobilization: This Bid Item will include all costs associated with mobilizing in order to perform the Scope or Work. 1. Include the following costs in this Bid item: a. Bonds and insurance; b. Transportation and setup for equipment; c. Transportation and/or erection of all field offices, sheds, and storage facilities; d. Salaries for preparation of documents required before the first Application for Payment; e. Salaries for field personnel assigned to the Project related to the mobilization of the Project; Measurement and Basis for Payment 01 29 01 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 f. Installation of any permanent or temporary utilities or access improvements required to perform the Scope of Work. g. Demobilization; and h. Mobilization may not exceed 5 percent of the total Contract Price. 2. Measuring for payment is on a lump sum basis. Payment for mobilization will be based on the earned value of Work completed. B. Bid Item A-2 — Dredge, Dewater, and Haul Residuals: 1. This item shall include but not be limited to all work and materials to; furnish dredge equipment, furnish and install turbidity protection for washwater return pump station, furnish and install dewatering equipment, polymer injection equipment, residual and polymer containment areas as required, filtrate return provisions, trucks, fuel, truck maintenance, maintenance of access, electrical feed for dewatering equipment, permits, licenses and certifications as required, and residual analytical testing) as per specification, Complete in Place per Dry Ton. Percentage complete will be measured by CY of berm constructed and by SF of dewatering area graded. 2. Measuring for payment is on a dry ton (DT) basis. Payment for this bid item will be based on the earned value of Work completed as described and calculated in specification section 46 76 11- Dredging Dewatering and Hauling. C. Bid Item A-3 — Aquatic Vegetation Removal: 1. Included in this Bid Item will be all costs for materials, labor, and equipment required to remove and dispose of the aquatic vegetation existing in Lagoon #7. 2. Measuring for payment is on a lump sum basis. 1.04 MEASUREMENT AND BASIS FOR PAYMENT FOR ALTERNATES AND ALLOWANCES (NOT USED) 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Measurement and Basis for Payment 01 29 01 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 01 31 00 PROJECT MANAGEMENT AND COORDINATION 1.00 GENERAL 1.01 WORK INCLUDED A. Furnish resources required to complete the Project with an acceptable standard of quality within the Contract Times. B. Construct Project in accordance with current safety practices. C. Manage Site to allow access to Site and control construction operations. D. Construct temporary facilities to provide and maintain control over environmental conditions at the Site. Remove temporary facilities when no longer needed. E. Provide temporary controls for pollutions, management of water and management of excess earth as required in SECTION 0157 00 TEMPORARY CONTROLS. 1.02 QUALITY ASSURANCE A. Employ competent workmen, skilled in the occupation for which they are employed. Provide Work meeting quality requirements of the Contract Documents. B. Remove Defective Work from the Site immediately unless provisions have been made and approved by the OPT to allow repair of the product at the Site. Clearly mark Work as Defective until it is removed or allowable repairs have been completed. 1.03 DOCUMENT SUBMITTAL A. Provide documents in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT. 1. Provide copies of Supplier's printed storage instructions prior to furnishing materials or products and installation instructions prior to beginning the installation. 2. Incorporate field notes, sketches, recordings, and computations made by the Contractor in Record Drawings. 1.04 PERMITS A. Obtain building permits for the Project from the local authorities having jurisdiction. Pay building permit fees and include this cost in the Contract Price. B. Obtain environmental permits required for construction at the Site. C. Provide required permits for transporting heavy or oversized loads. D. Provide other permits required to conduct any part of the Work. E. Arrange for inspections and certification by agencies having jurisdiction over the Work. F. Make arrangements with private utility companies and pay for fees associated with obtaining services, or for inspection fees. G. Retain copies of permits and licenses at the Site and observe and comply with all regulations and conditions of the permit or license. Project Management and Coordination 01 3100 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 1.05 SAFETY REQUIREMENTS A. Manage safety to protect the safety and welfare of persons at the Site. B. Provide safe access to move through the Site. Provide protective devices to warn and protect from hazards at the Site. C. Provide safe access for those performing tests and inspections. D. Comply with latest provisions of the Occupational Health and Safety Administration and other Laws and Regulation. E. Cooperate with accident investigations. Provide two copies of all reports, including insurance company reports, prepared concerning accidents, injury, or death related to the Project to the OAR as Record Data per SECTION 0133 03 RECORD DATA. 1.06 ACCESS TO THE SITE A. Maintain access to the facilities at all times. Do not obstruct roads, pedestrian walks, or access to the various buildings, structures, stairways, or entrances. Provide safe access for normal operations during construction. B. Provide adequate and safe access for inspections. Leave ladders, bridges, scaffolding, and protective equipment in place until inspections have been completed. Construct additional safe access if required for inspections. C. Use roadways for construction traffic only with written approval of the appropriate representatives of each entity. Roadways may not be approved for construction traffic. Obtain written approval to use roads to deliver heavy or oversized loads to the Site. Furnish copies of the written approvals to the Owner as Record Data per SECTION 0133 03 RECORD DATA. 1.07 CONTRACTOR'S USE OF SITE A. Limit the use of Site for Work and storage to those areas designated on the Drawings or approved by the OAR. Coordinate the use of the premises with the OAR. B. Provide security at the Site as necessary to protect against vandalism and loss by theft. C. Do not permit alcoholic beverages or illegal substances on the Site. Do not allow persons under the influence of alcoholic beverages or illegal substances to enter or remain on the Site at any time. Persons on Site under the influence of alcoholic beverages or illegal substances will be permanently prohibited from returning to the Site. Criminal or civil penalties may also apply. D. Park construction equipment in designated areas only and provide spill control measures as discussed in SECTION 0157 00 TEMPORARY CONTROLS. E. Park employees' vehicles in designated areas only. F. Obtain written permission of the Owner before entering privately -owned land outside of the Owner's property, rights-of-way, or easements. G. Do not allow the use of audio devices, obnoxious, vulgar or abusive language, or sexual harassment in any form. These actions will cause immediate and permanent removal of the offender from the premises. Criminal or civil penalties may apply. Project Management and Coordination 01 3100 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 H. Require Workers to wear clothing that is inoffensive and meets safety requirements. Do not allow sleeveless shirts, shorts, exceedingly torn, ripped, or soiled clothing to be worn on the Project. I. Do not allow firearms or weapons of any sort to be brought on to the Site under any conditions. No exception is to be made for persons with concealed handgun permits. Remove any firearms or weapons and the person possessing these firearms or weapons immediately from the Site. 1.08 PROTECTION OF EXISTING STRUCTURES AND UTILITIES A. Examine the Site and review the available information concerning the Site. Locate utilities, streets, driveways, fences, drainage structures, sidewalks, curbs, and gutters. Verify the elevations of the structures adjacent to excavations. Report any discrepancies from information in the Contract Documents to the OAR before beginning construction. B. Determine if existing structures, poles, piping, or other utilities at excavations will require relocation or replacement. Prepare a Plan of Action per SECTION 0135 00 SPECIAL PROCEDURES. Coordinate Work with local utility company and others for the relocation or replacement. C. Protect buildings, utilities, street surfaces, driveways, sidewalks, curb and gutter, fences, wells, drainage structures, piping, valves, manholes, electrical conduits, and other systems or structures unless they are shown to be replaced or relocated on the Drawings. Restore damaged items to the satisfaction of the OPT and utility owner. D. Carefully support and protect all structures and/or utilities so that there will be no failure or settlement where excavation or demolition endangers adjacent structures and utilities. Do not take existing utilities out of service unless required by the Contract Documents or approved by the OAR. Notify and cooperate with the utility owner if it is necessary to move services, poles, guy wires, pipelines, or other obstructions. E. Protect existing trees and landscaping at the Site. 1. Identify trees that may be removed during construction with OPT. 2. Mark trees to be removed with paint. 3. Protect trees to remain from damage by wrapping trunks with 2 x 4 timbers around the perimeter, securely wired in place, where machinery must operate around existing trees. Protect branches and limbs from damage by equipment. 4. Protect root zone from compaction. 1.09 DISRUPTION TO SERVICES / CONTINUED OPERATIONS A. Existing facilities are to continue in service as usual during the construction unless noted otherwise. Owner of utilities must be able to operate and maintain the facilities. Keep disruptions to existing utilities, piping, process piping, or electrical services to a minimum. 1. Do not restrict access to critical valves or operators. 2. Limit operations to the minimum amount of space needed to complete the specified Work. Project Management and Coordination 01 3100 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 3, Maintain storm sewers and sanitary sewers in service at all times. Provide temporary service around the construction or otherwise construct the structure in a manner that the flow is not restricted. B. Provide a Plan of Action in accordance with SECTION 0135 00 SPECIAL PROCEDURES if facilities must be taken out of operation. 1.10 FIELD MEASUREMENTS A. Perform complete field measurements prior to purchasing products or beginning construction for products required to fit existing conditions. B. Verify property lines, control lines, grades, and levels indicated on the Drawings. C. Check Shop Drawings and indicate the actual dimensions available where products are to be installed. D. Include field measurements in Record Drawings as required in SECTION 0131 13 PROJECT COORDINATION. 1.11 REFERENCE DATA AND CONTROL POINTS A. The OPT will provide the following control points: 1. Base line or grid reference points for horizontal control. 2. Benchmarks for vertical control. B. Locate and protect control points prior to starting the Work and preserve permanent reference points during construction. Designated control points may be on an existing structure or monument. Do not change or relocate points without prior approval of the OAR. Notify OAR when the reference point is lost, destroyed, or requires relocation. Replace Project control points on the basis of the original survey. C. Provide complete engineering layout of the Work needed for construction. 1. Provide competent personnel. Provide equipment including accurate surveying instruments, stakes, platforms, tools, and materials. 2. Provide surveying with accuracy meeting the requirements established for Category 5 Construction Surveying as established in the Manual of Practice of Land Surveying in Texas published by the Texas Society of Professional Surveyors, latest revision. 3. Record Data and measurements per standards. 1.12 DELIVERY AND STORAGE A. Deliver products and materials to the Site in time to prevent delays in construction. B. Deliver packaged products to Site in original undamaged containers with identifying labels attached. Open cartons as necessary to check for damage and to verify invoices. Reseal cartons and store properly until used. Leave products in packages or other containers until installed. C. Assume full responsibility for the protection and safekeeping of products stored at the Site. Project Management and Coordination 01 3100 - 4 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 D. Store products at locations acceptable to the OAR and to allow Owner access to maintain and operate existing facilities. E. Store products in accordance with the Supplier's storage instructions immediately upon delivery. Leave seals and labels intact. F. Provide additional storage areas as needed for construction. Store products subject to damage by elements in substantial weather -tight enclosures or storage sheds. Provide and maintain storage sheds as required for the protection of products. Provide temperature, humidity control, and ventilation within the ranges stated in the Supplier's instructions. Remove storage facilities at the completion of the Project. G. Protect the pipe interior. Keep all foreign materials such as dirt, debris, animals, or other objects out of the pipe during the Work. Cap or plug ends of installed pipe in an approved manner when pipe is not being installed. Clean or wash out pipe sections that become contaminated before continuing with installation. Take precautions to prevent the pipe from floating or moving out of the proper position during or after laying operations. Immediately correct any pipe that moves from its correct position. H. Provide adequate exterior storage for products that may be stored out-of-doors. 1. Provide substantial platforms, blocking, or skids to support materials and products above ground which has been sloped to provide drainage. Protect products from soiling or staining. 2. Cover products subject to discoloration or deterioration from exposure to the elements, with impervious sheet materials. Provide ventilation to prevent condensation below covering. 3. Store loose, granular materials on clean, solid surfaces, or on rigid sheet materials, to prevent mixing with foreign matter. 4. Provide surface drainage to prevent erosion and ponding of water. 5. Prevent mixing of refuse or chemically injurious materials or liquids with stored materials. 6. Pipes and conduits stored outdoors are to have open ends sealed to prevent the entrance of dirt, moisture, and other injurious materials. Protect PVC pipe from ultraviolet light exposure. 7. Store light weight products to prevent wind damage. I. Maintain storage facilities. Inspect stored products on a weekly basis and after periods of severe weather to verify that: 1. Storage facilities continue to meet specified requirements; 2. Supplier's required environmental conditions are continually maintained; and 3. Products that can be damaged by exposure to the elements are not adversely affected. J. Replace any stored item damaged by inadequate protection or environmental controls. K. Payment may be withheld for any products not properly stored. Project Management and Coordination 01 3100 - 5 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 1.13 CLEANING DURING CONSTRUCTION A. Provide positive methods to minimize raising dust from construction operations and provide positive means to prevent air -borne dust from disbursing into the atmosphere. Control dust and dirt from demolition, cutting, and patching operations. B. Clean the Project as Work progresses and dispose of waste materials, keeping the Site free from accumulations of waste or rubbish. Provide containers on Site for waste collection. Do not allow waste materials or debris to blow around or off of the Site. Control dust from waste materials. Transport waste materials with as few handlings as possible. C. Comply with Laws and Regulations. Do not burn or bury waste materials. Remove waste materials, rubbish and debris from the Site and legally dispose of these at public or private disposal facilities. D. Provide a final cleaning to thoroughly clean the entire Site and make ready for acceptance. 1. Remove construction debris, boxes, and trash from the Site. 2. Remove construction storage sheds and field offices. 3. Restore grade to match surrounding condition and remove excess dirt. 4. Sweep all drives and parking lots clean of dirt and debris. Use water trucks or hose down paved site to like new appearance. 1.14 MAINTENANCE OF ROADS, DRIVEWAYS, AND ACCESS A. Maintain roads and streets in a manner that is suitable for safe operations of public vehicles during all phases of construction unless the Owner approves a street closing. Do not close public roads overnight. B. Submit a Notification by Contractor for Owner's approval of a street closing. The request shall state: 1. The reason for closing the street. 2. How long the street will remain closed. 3. Procedures to be taken to maintain the flow of traffic. C. Construct temporary detours, including by-pass roads around construction, with adequately clear width to maintain the free flow of traffic at all times. Maintain barricades, signs, and safety features around the detour and excavations. Maintain barricades, signs, and safety features around the Work in accordance with all provisions of the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD). D. Assume responsibility for any damage resulting from construction along roads or drives. 1.15 AREA ACCESS AND TRAFFIC CONTROL A. Provide traffic control measures to assure a safe condition and to provide a minimum of inconvenience to motorists and the public. Provide all-weather access to all residents and businesses at all times during construction. Provide temporary driveways and/or roads of approved material during wet weather. Maintain a stockpile of suitable material on the Site to meet the demands of inclement weather. Project Management and Coordination 01 3100 - 6 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 B. Schedule operations to minimize adverse impact on the accessibility of adjoining properties. Sequence construction to build driveways in half widths, construct temporary ramps, or any other measure required to maintain access to adjoining properties. C. Comply with the Owner's Uniform Barricading Standards and Practices. Copies of this document are available through the Owner's Traffic Engineering Department. Secure required permits from the Owner's Traffic Engineering Department. 1.16 OVERHEAD ELECTRICAL WIRES A. Comply with OSHA safety requirements regarding construction equipment working beneath overhead electrical wires. Prevent and pay for repairs for damage to existing overhead electrical wires or facilities. B. Provide for adequate safety with regard to overhead lines whether overhead lines are or are not shown in the Contract Documents. 1.17 BLASTING A. Blasting is not allowed for any purpose. 1.18 ARCHAEOLOGICAL REQUIREMENTS A. Cease operations immediately and contact the Owner for instructions if historical or archaeological artifacts are found during construction. B. Conduct all construction activities to avoid adverse impact on the Sites where significant historical or archaeological artifacts are found or identified as an area where other artifacts could be found. 1. Obtain details for Working in these areas. 2. Maintain confidentiality regarding the Site. 3. Adhere to the requirements of the Texas Historical Commission. 4. Notify the OAR and the Texas Historical Commission. C. Do not disturb archaeological sites. 1. Obtain the services of a qualified archaeological specialist to instruct construction personnel on how to identify and protect archaeological finds on an emergency basis. 2. Coordinate activities to permit archaeological work to take place within the area. a. Attempt to archaeologically clear areas needed for construction as soon as possible. b. Provide a determination of priority for such areas. D. Assume responsibility for any unauthorized destruction that might result to such Sites by construction personnel, and pay all penalties assessed by the State or Federal agencies for non-compliance with these requirements. E. Contract Times will be modified to compensate for delays caused by such archaeological finds. No additional compensation will be paid for delays. Project Management and Coordination 01 3100 - 7 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 1.19 ENDANGERED SPECIES RESOURCES A. Do not perform any activity that is likely to jeopardize the continued existence of a threatened or endangered species as listed or proposed for listing under the Federal Endangered Species Act (ESA), and/or the State of Texas Parks and Wildlife Code on Endangered Species, or to destroy or adversely modify the habitat of such species. B. Cease Work immediately in the area of the encounter and notify the OAR if a threatened or endangered species is encountered during construction. OPT will implement actions in accordance with the ESA and applicable State statutes. Resume construction in the area of the encounter when authorized to do so by the OAR. 1.20 COOPERATION WITH PUBLIC AGENCIES A. Cooperate with all public and private agencies with facilities operating within the limits of the Project. B. Provide a 48-hour notice to any applicable agency when work is anticipated to proceed in the vicinity of any facility by using Texas 811 at 811 and the Lone Star Notification Company at 1-800-669-8344. Note to Specifier: The information in the table below should be reviewed and updated as necessary for each project. C. For the Contractor's convenience, the following telephone numbers are listed: Public Agencies/Contacts Phone Number City Engineer 361-826-3500 Project Engineer 361-826-1929 LNV, Inc. 361-883-1984 Traffic Engineering 361-826-3547 Police Department 361-882-2600 361-826-1800 (361-826-1818 after Water/ Wastewater/ Stormwater hours) 361-885-6900 (361-885-6942 after Gas Department hours) 361-885-5999 (Dispatch after hours) Parks & Recreation Department 361-826-3461 Street Department 361-826-1875 City Street Div. for Traffic Signals 361-826-1610 Solid Waste & Brush 361-826-1973 MIS Department (City Fiber) 361-826-3740 AEP 1-877-373-4858 AT&T 361-881-2511 (1-800-824-4424 after hours) Project Management and Coordination O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 013104-8 Rev 01-13-2016 Public Agencies/Contacts Phone Number Grande Communications 254-379-4400 Time Warner Communications Crown Castle Communications 1-888-632-0931 Century Tel 361-883-3000 Windstream Regional Transportation Authority 361-289-2712 Port of Corpus Christi Authority Engr. 361-882-5633 TxDOT Area Office 361-808-2500 Corpus Christi ISD 361-886-9005 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Project Management and Coordination 01 3100 - 9 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 01-13-2016 01 31 13 PROJECT COORDINATION 1.00 GENERAL 1.01 WORK INCLUDED A. Administer Contract requirements to construct the Project. Provide documentation per the requirements of this Section. Provide information as requested by the OPT. 1.02 DOCUMENT SUBMITTAL A. Provide documents in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT. B. Use the forms provided for Contract administration, applications for payment, document submittals, documentation of test results, equipment installation and documentation, and Project closeout. A digital copy of the required forms will be provided to the Contractor before or at the pre -construction conference. 1.03 COMMUNICATION DURING THE PROJECT A. The OAR is to be the first point of contact for all parties on matters concerning this Project. B. The Designer will coordinate correspondence concerning: 1. Documents, including Applications for Payment. 2. Clarification and interpretation of the Contract Documents. 3. Contract Modifications. 4. Observation of Work and testing. 5. Claims. C. The OAR will normally communicate only with the Contractor. Any required communication with Subcontractors or Suppliers will only be with the direct involvement of the Contractor. D. Direct written communications to the OAR at the address indicated at the pre -construction conference. Include the following with communications as a minimum: 1. Name of the Owner. 2. Project name. 3. Contract title. 4. Project number. 5. Date. 6. A reference statement. E. Submit communications on the forms referenced in this Section or in SECTION 0133 00 DOCUMENT MANAGEMENT. Project Coordination 01 31 13 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 1.04 PROJECT MEETINGS A. Pre -Construction Conference: 1. Attend a pre -construction conference. 2. The location of the conference will be determined by the OAR. 3. The time of the meeting will be determined by the OAR but will be after the Notice of Award is issued and not later than 15 days after the Notice to Proceed is issued. 4. The OPT, Contractor's project manager and superintendent, representatives of utility companies, and representatives from major Subcontractors and Suppliers may attend the conference. 5. Provide and be prepared to discuss: a. Preliminary construction schedule per SECTION 01 33 04 CONSTRUCTION PROGRESS SCHEDULE. b. Schedule of Values and anticipated Schedule of Payments per SECTION 0129 00 APPLICATION FOR PAYMENT PROCEDURES. c. List of Subcontractors and Suppliers. d. Contractor's organizational chart as it relates to this Project. e. Letter indicating the agents of authority for the Contractor and the limit of that authority with respect to the execution of legal documents, Contract Modifications, and payment requests. B. Progress Meetings: 1. Attend meetings with the OAR and Owner. a. Meet on a monthly basis or as requested by the OAR to discuss the Project. b. Meet at the Site or other location as designated by the OAR. c. Contractor's superintendent and other key personnel are to attend the meeting. Other individuals may be requested to attend to discuss specific matters. d. Notify the OAR of any specific items to be discussed a minimum of 1 week prior to the meeting. 2. Provide information as requested by the OAR or Owner concerning this Project. Prepare to discuss: a. Status of overall Project schedule. b. Contractor's detailed schedule for the next month. c. Anticipated delivery dates for equipment. d. Coordination with the Owner. e. Status of documents. f. Information or clarification of the Contract Documents. g. Claims and proposed Modifications to the Contract. Project Coordination 01 31 13 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 h. Field observations, problems, or conflicts. i. Maintenance of quality standards. 3. OAR will prepare minutes of meetings. Review the minutes of the meeting and notify the OAR of any discrepancies within 10 days of the date of the meeting memorandum. The minutes will not be corrected after the 10 days have expired. Corrections will be reflected in the minutes of the following meeting or as an attachment to the minutes. C. Pre- Submittal and Pre -Installation Meetings: 1. Conduct pre -submittal and pre -installation meetings as required in the individual technical Specifications or as determined necessary by the OAR (for example, instrumentation, roofing, concrete mix design, etc.). 2. Set the time and location of the meetings when ready to proceed with the associated Work. Submit a Notification by Contractor in accordance with Paragraph 1.07 for the meeting 2 weeks before the meeting. OPT must approve of the proposed time and location. 3. Attend the meeting and require the participation of appropriate Subcontractors and Suppliers in the meeting. 4. Prepare minutes of the meeting and submit to the OPT for review. OPT will review the minutes of the meeting and notify the Contractor of any discrepancies within 10 days of the date of the meeting memorandum. The minutes will not be corrected after the 10 days have expired. Corrections will be reflected in a revised set of meeting minutes. 1.05 REQUESTS FOR INFORMATION A. Submit Request for Information (RFI) to the Designer to obtain additional information or clarification of the Contract Documents. 1. Submit a separate RFI for each item on the form provided. 2. Attach adequate information to permit a written response without further clarification. Designer will return requests that do not have adequate information to the Contractor for additional information. Contractor is responsible for all delays resulting from multiple document submittals due to inadequate information. 3. A response will be made when adequate information is provided. Response will be made on the RFI form or in attached information. B. Response to an RFI is given to provide additional information, interpretation, or clarification of the requirements of the Contract Documents, and does not modify the Contract Documents. C. Designer will initiate a Request for a Change Proposal (RCP) per SECTION 0131 14 CHANGE MANAGEMENT if the RFI indicates that a Contract Modification is required. D. Use the Project Issues Log to document decisions made at meetings and actions to be taken in accordance with Paragraph 1.06. E. Use the Action Item Log to document assignments for actions to be taken in accordance with Paragraph 1.06. Project Coordination 01 31 13 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 1.06 DECISION AND ACTION ITEM LOG A. OAR will maintain a Project Decision Log to document key decisions made at meetings, telephone conversation or Site visits using the format provided: 1. Review the log prior to each regular meeting. 2. Report any discrepancies to the OAR for correction or discussion at the next monthly meeting. B. OAR will maintain an Action Item log in conjunction with the Project Decision Log to track assignments made at meetings, telephone conversation, or Site visits using the format provided: 1. Review the Action Item Log prior to each regular meeting. 2. Report actions taken subsequent to the previous progress meeting on items in the log assigned to the Contractor or through the Contractor to a Subcontractor or Supplier to the OAR, Report on status of progress 1 week prior to each progress meeting established in Paragraph 1.04 to allow OAR to update the log prior to the Progress meetings. 3, Be prepared to discuss the status at each meeting. C. Decisions or action items in the log that require a change in the Contract Documents will have the preparation of a Modification as an action items if appropriate. The Contract Documents can only be changed by a Modification. 1.07 NOTIFICATION BY CONTRACTOR A. Notify the OAR of: 1. Need for testing. 2. Intent to work outside regular working hours. 3. Request to shut down facilities or utilities. 4. Proposed utility connections. 5. Required observation by OAR, Designer, or inspection agencies prior to covering Work. 6. Training. B. Provide notification a minimum of 2 weeks in advance in order to allow OPT time to respond appropriately to the notification. C. Use "Notification by Contractor" form provided. 1.08 RECORD DOCUMENTS A. Maintain at the Site one complete set of printed Record Documents including: 1. Drawings. 2. Specifications. 3. Addenda. 4. Modifications. Project Coordination 01 31 13 - 4 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 5. Record Data and approved Shop Drawings. 6. Construction photographs. 7. Test Reports. 8. Clarifications and other information provided in Request for Information responses. 9. Reference standards. B. Store printed Record Documents and Samples in the Contractor's field office. 1. Record Documents are to remain separate from documents used for construction. 2. Provide files and racks for the storage of Record Documents. 3. Provide a secure storage space for the storage of Samples. 4. Maintain Record Documents in clean, dry, legible conditions, and in good order. 5. Make Record Documents and Samples available at all times for inspection by the OPT. C. Maintain a digital record of Specifications and Addenda to identify products provided in PDF format. 1. Reference the Record Data number, Shop Drawings number, and O&M manual number for each product and item of equipment furnished or installed. 2. Reference Modifications by type and number for all changes. D. Maintain a digital record of Drawings in PDF format. 1. Reference the Record Data number, Shop Drawings number, and O&M manual number for each product and item of equipment furnished or installed. 2. Reference Modifications by type and number for all changes. 3. Record information as construction is being performed. Do not conceal any Work until the required information is recorded. 4. Mark Drawings to record actual construction, including the following: a. Depths of various elements of the foundation in relation to finished first floor datum or the top of walls. b. Horizontal and vertical locations of underground utilities and appurtenances constructed and existing utilities encountered during construction. c. Location of utilities and appurtenances concealed in the Work. Refer measurements to permanent structures on the surface. Include the following equipment: 1) Piping. 2) Ductwork. 3) Equipment and control devices requiring periodic maintenance or repair. 4) Valves, unions, traps, and tanks. 5) Services entrance. 6) Feeders. Project Coordination 01 31 13 - 5 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 7) Outlets. d. Changes of dimension and detail. e. Changes by Modifications. f. Information in Request for Information or included in the Project Issues Log. g. Details not on the original Drawings. Include field verified dimensions and clarifications, interpretations, and additional information issued in response to RFIs. 5. Mark Drawings with the following colors: a. Highlight references to other documents, including Modifications in blue; b. Highlight mark ups for new or revised Work (lines added) in yellow; c. Highlight items deleted or not installed (lines to be removed) in red; and d. Highlight items constructed per the Contract Documents in green. 6. Submit Record Documents to Designer for review and acceptance 30 days prior to Final Completion of the Project. E. Applications for Payment will not be recommended for payment if Record Documents are found to be incomplete or not in order. Final payment will not be recommended without complete Record Documents. 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Project Coordination 01 31 13 - 6 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 01 31 14 CHANGE MANAGEMENT 1.00 GENERAL 1.01 REQUESTS FOR CHANGE PROPOSAL A. Designer will initiate Modifications by issuing a Request for a Change Proposal (RCP). 1. Designer will prepare a description of proposed Modifications. 2. Designer will issue the Request for a Change Proposal form to Contractor. A number will be assigned to the Request for a Change Proposal when issued. 3. Return a Change Proposal in accordance with Paragraph 1.02 to the Designer for evaluation by the OPT. 1.02 CHANGE PROPOSALS A. Submit a Change Proposal (CP) to the Designer for Contractor initiated changes in the Contract Documents or in response to a Request for Change Proposal. 1. Use the Change Proposal form provided. 2. Assign a number to the Change Proposal when issued. 3. Include with the Change Proposal: a. A complete description of the proposed Modification if Contractor initiated or proposed changes to the OPT's description of the proposed Modification. b. The reason the Modification is requested, if riot in response to a Request for a Change Proposal. c. A detailed breakdown of the cost of the change if the Modification requires a change in Contract Price. The itemized breakdown is to include: 1) List of materials and equipment to be installed; 2) Mari hours for labor by classification; 3) Equipment used in construction; 4) Consumable supplies, fuels, and materials; 5) Royalties and patent fees; 6) Bonds and insurance; 7) Overhead and profit; 8) Field office costs; 9) Home office cost; and 10) Other items of cost. d. Provide the level of detail outline in the paragraph above for each Subcontractor or Supplier actually performing the Work if Work is to be provided by a Subcontractor or Supplier. Indicate appropriate Contractor mark-ups for Work Change Management 01 31 14 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 provided through Subcontractors and Suppliers. Provide the level of detail outline in the paragraph above for self -performed Work. e. Submit Change Proposals that comply with Article 13 of the General Conditions for Cost of Work. f. Provide a revised schedule. Show the effect of the change on the Project Schedule and the Contract Times. B. Submit a Change Proposal to the Designer to request a Field Order. C. A Change Proposal is required for all substitutions or deviations from the Contract Documents. D. Request changes to products in accordance with SECTION 0133 02 SHOP DRAWINGS. 1.03 DESIGNER WILL EVALUATE THE REQUEST FOR A MODIFICATION. A. Designer will issue a Modification per the General Conditions if the Change Proposal is acceptable to the Owner. Designer will issue a Change Order or Contract Amendment for any changes in Contract Price or Contract. Times. 1. Change Orders and Contract Amendments will be sent to the Contractor for execution with a copy to the Owner recommending approval. A Work Change Directive may be issued if Work needs to progress before the Change Order or Contract Amendment can be authorized by the Owner. 2. Work Change Directives, Change Orders, and Contract Amendments can only be approved by the Owner. a. Work performed on the Change Proposal prior to receiving a Work Change Directive or approval of the Change Order or Contract Amendment is performed at the Contractor's risk. b. No payment will be made for Work on Change Orders or Contract Amendments until approved by the Owner. B. The Contractor may be informed that the Request for a Change Proposal is not approved and construction is to proceed in accordance with the Contract Documents. 1.04 EQUAL NON SPECIFIED PRODUCTS A. The products of the listed Suppliers are to be furnished where Specifications list several manufacturers but do not specifically list "or equal" or "or approved equal" products. Use of any products other than those specifically listed is a substitution. Follow the procedures in Paragraph 1.05 for a substitution. B. Contractor may submit other manufacturers' products that are in full compliance with the Specification where Specifications list one or more manufacturers followed by the phase "or equal" or "or approved equal." 1. Submit a Shop Drawing as required by SECTION 01 33 02 SHOP DRAWINGS to document that the proposed product is equal or superior to the specified product. 2. Prove that the product is equal. It is not the OPT's responsibility to prove the product is not equal. Change Management 01 31 14 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 a. Indicate on a point by point basis for each specified feature that the product is equal to the Contract Document requirements. b. Make a direct comparison with the specified manufacturer's published data sheets and available information. Provide this printed material with the Shop Drawing. c. The decision of the Designer regarding the acceptability of the proposed product is final. 3. Provide a typewritten certification that, in furnishing the proposed product as an equal, the Contractor: a. Has thoroughly examined the proposed product and has determined that it is equal or superior in all respects to the product specified. b. Has determined that the product will perform in the same manner and result in the same process as the specified product. c. Will provide the same warranties and/or bonds as for the product specified. d. Will assume all responsibility to coordinate any modifications that may be necessary to incorporate the product into the construction and will waive all claims for additional Work which may be necessary to incorporate the product into the Project which may subsequently become apparent. e. Will maintain the same time schedule as for the specified product. 4. A Change Proposal is not required for any product that is in full compliance with the Contract Documents. If the product is not in full compliance, it may be offered as a Substitution. 1.05 SUBSTITUTIONS A. Substitutions are defined as any product that the Contractor proposes to provide for the Project in lieu of the specified product. Submit a Change Proposal per Paragraph 1.02 along with a Shop Drawing as required by SECTION 0133 02 SHOP DRAWINGS to request approval of a substitution. B. Prove that the product is acceptable as a substitute. It is not the Designer's responsibility to prove the product is not acceptable as a substitute. 1. Indicate on a point by point basis for each specified feature that the product is acceptable to meet the intent of the Contract Documents requirements. 2. Make a direct comparison with the specified Suppliers published data sheets and available information. Provide this printed material with the documents submitted. 3. The decision of the Designer regarding the acceptability of the proposed substitute product is final. C. Provide a written certification that, in making the substitution request, the Contractor: 1. Has determined that the substituted product will perform in substantially the same manner and result in the same ability to meet the specified performance as the specified product. Change Management 01 31 14 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 2. Will provide the same warranties and/or bonds for the substituted product as specified or as would be provided by the manufacturer of the specified product. 3. Will assume all responsibility to coordinate any modifications that may be necessary to incorporate the substituted product into the Project and will waive all claims for additional Work which may be necessary to incorporate the substituted product into the Project which may subsequently become apparent. 4. Will maintain the same time schedule as for the specified product. D. Pay for review of substitutions in accordance with SECTION 0133 02 SHOP DRAWINGS. 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Change Management 01 31 14 - 4 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 01 33 00 DOCUMENT MANAGEMENT 1.00 GENERAL 1.01 WORK INCLUDED A. Submit documentation as required by the Contract Documents and as reasonably requested by the OPT. 1.02 QUALITY ASSURANCE A. Submit legible, accurate, complete documents presented in a clear, easily understood manner. Documents not meeting these criteria will be returned without review. 1.03 CONTRACTOR'S RESPONSIBILITIES A. Review documents prior to submitting. Make certifications as required by the Contract Documents and as indicated on forms provided. B. Provide a Schedule of Documents to list the documents that are to be submitted, the dates on which documents are to be sent to the Designer for review, and proposed dates that documents must be returned to comply with the Project schedule. Use the form provided for this list. C. Incorporate the dates for processing documents into the Progress Schedule required by SECTION 01 33 04 CONSTRUCTION PROGRESS SCHEDULE. 1. Provide documents in accordance with the schedule so construction of the Project is not delayed. 2. Allow a reasonable time for the review of documents when preparing the Progress Schedule. Assume a 14 day review cycle for each document unless a longer period of time is indicated in the Contract Documents or agreed to by Designer and Contractor. 3. Schedule submittal of documents to provide all information for interrelated Work at one time. 4. Allow adequate time for processing documents so construction of the Project is not delayed. 1.04 DOCUMENT SUBMITTAL PROCEDURES A. Submit documents through the Designer. Send all documents in digital format for processing. 1. Provide all information requested with a completed Document Transmittal form. Do not leave any blanks incomplete. If information is not applicable, enter NA in the space provided. 2. The Document Transmittal form is to be the first page in the document submitted. 3. Submit all documents in Portable Document Format (PDF). Document Management 01 33 00 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 a. Create PDF document using Bluebeam Revu software or other compatible software that will create files that can be opened and annotated using Bluebeam Revu software. b. Create PDF documents from native format files unless files are only available from scanned documents. c. Rotate pages so that the top of each document appears at the top of the monitor screen when opened in PDF viewing software. d. Submit PDF document with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. e. Submit color PDF documents where color is required to interpret the document. f. Create or convert documents to allow text to be selected for comments or searched using text search features. Run scanned documents through Optical Character Recognition (OCR) software if necessary. Flatten markups in documents to prevent markups made by Contractor from being moved or deleted. Flatten documents to allow markup recovery. h. Use Bluebeam Revu software to reduce file size using default settings except the option for "Drop Metadata." Uncheck the "Drop Metadata" box when reducing file size g. i. Add footers to each document with the Project name. 1.05 DOCUMENT NUMBERING A. Assign a number to the documents originated to allow tracking of the documents during the review process. 1. Assign the number consisting of a prefix, a sequence number, and a letter suffix. Prefixes shall be as follows: Prefix Description Originator AP Application for Payment Contractor CO Change Order OAR CP Change Proposal Contractor CTR Certified Test Report Contractor FO Field Order OAR NBC Notification by Contractor Contractor PD Photographic Documentation Contractor RCP Request for a Change Proposal OAR RD Record Data Contractor RFI Request for Information Contractor SD Shop Drawing Contractor Document Management 01 33 00 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 Prefix Description Originator SCH Schedule of Progress Contractor 2. Issue sequence numbers in chronological order for each type of document. 3. Issue numbers for resubmittals that have the same number as the original document followed by an alphabetical suffix indicating the number of times the same document has been sent to the Designer for processing. For example: SD 025 A represents Shop Drawing number 25 and the letter "A" designates that this is the second time this document has been sent for review. 4. Clearly note the document number on each page or sheet of the document. 5. Correct assignment of numbers is essential since different document types are processed in different ways. B. Include reference the Drawing number and/or Specification Section, detail designation, schedule, or location that corresponds with the data on the document transmittal forms. Other identification may also be required, such as layout drawings or schedules to allow the reviewer to determine where a particular product is to be used. 1.06 DOCUMENT REQUIREMENTS A. Furnish documents as indicated below or in individual Specification Sections. Submit documents per the procedures described in the Contract Documents. B. Submit documents per the Specification Section shown in the following table: Document Type Specification Section Application for Payment 01 29 00 Change Proposal 0131 14 Certified Test Report 0133 02 for approval of product 0140 00 to demonstrate compliance Notification by Contractor 0131 13 Photographic Documentation 0133 05 Progress Schedules 0133 04 Record Data 0133 03 Request for Information 0131 13 Shop Drawing 0133 02 Schedule of Values 01 29 00 Substitutions 0131 14 Suppliers and Subcontractors 0131 13 and 0133 03 Document Management 01 33 00 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Document Management 01 33 00 - 4 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 01 33 01 Submittal Register Specification Section Specification Description Paragraph No. Types of Submittals Required Product Information Sample or Mockup Operations Data 46 76 11 Dredge Equipment 1.02.0 V '7 46 76 11 dewatering Equipment 1.02.E V ✓ 46 76 11 Polymer 1.02.F ✓ 46 76 11 Polymer Feed Station 1.02.6 v v 46 76 11 Trucks and Containers 1.02.H 46 76 11 Turbidity Curtain 1.02.1 V 46 76 11 Percent Solids Sampling Plan 1.02.J '7 46 76 11 Testing Laboratory 1.02.K V 46 76 11 Pipeline Map 1.02.L ✓ 46 76 11 Daily Activity Reports 1.02.N '7 46 76 11 Spill Contingency Plan 1.02.0 46 76 11 Monthly Operations Report 1.02.P ✓ 01 35 00 Plan of Action 1.02 '7 Submittal Register O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 0133 01-1 07-03-2014 01 33 02 SHOP DRAWINGS 1.00 GENERAL 1.01 WORK INCLUDED A. Shop Drawings are required for those products that cannot adequately be described in the Contract Documents to allow fabrication, erection, or installation of the product without additional detailed information from the Supplier. B. Submit Shop Drawings as required by the Contract Documents and as reasonably requested by the OPT to: 1. Record the products incorporated into the Project for the Owner; 2. Provide detailed information for the products proposed for the Project regarding their fabrication, installation, commissioning, and testing; and 3. Allow the Designer to advise the Owner if products proposed for the Project by the Contractor conform, in general, to the design concepts of the Contract Documents. C. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the review of Shop Drawings, Samples, or mockups. Contract modifications can only be approved by Change Order or Field Order. 1.02 QUALITY ASSURANCE A. Submit legible, accurate, and complete documents presented in a clear, easily understood manner. Shop Drawings not meeting these criteria will be rejected. B. Demonstrate that the proposed products are in full and complete compliance with the design criteria and requirements of the Contract Documents, or will be if deviations requested per Paragraph 1.10 are approved. C. Furnish and install products that fully comply with the information included in the document submittal. 1.03 CONTRACTOR'S RESPONSIBILITIES A. Provide Shop Drawings for the following items: Specification Section Shop Drawing Description B. Include Shop Drawings in the Schedule of Documents required by SECTION 0133 00 DOCUMENT MANAGEMENT to indicate the Shop Drawings to be submitted, the dates on which documents are to be sent to the Designer for review and proposed dates that the product will be incorporated into the Project. C. Incorporate the dates for processing Shop Drawings into the Progress Schedule required by SECTION 0133 04 CONSTRUCTION PROGRESS SCHEDULE. Shop drawings O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 013302-1 11-25-2013 1. Submit Shop Drawings in accordance with the schedule so construction of the Project is not delayed. 2. Allow a reasonable time for the review of Shop Drawings when preparing the Progress Schedule. Include time for making revisions to the Shop Drawings and resubmitting the Shop Drawing for a least a second review. Assume a 14 day review cycle for each time a Shop Drawing is submitted for review unless a longer period of time is indicated in the Contract Documents. 3. Schedule document submittals to provide all information for interrelated Work at one time. 4. Allow adequate time for ordering, fabricating, delivering, and installing product so construction of the Project is not delayed. D. Complete the following before submitting a Shop Drawing or Sample: 1. Prepare Shop Drawing Review and coordinate the Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents; 2. Determine and verify specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information with respect to Shop Drawings and Samples; 3. Determine and verify the suitability of materials and equipment offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and 4. Determine and verify information relative to Contractor's responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto. E. Determine and verify: 1. Accurate field measurements, quantities, and dimensions are shown on the Shop Drawing; 2. Location of existing structures, utilities, and equipment related to the Shop Drawing have been shown and conflicts between the products existing structures, utilities, and equipment have been identified; 3. Conflicts that impact the installation of the products have been brought to the attention of the OPT through the Designer; 4. Shop Drawing are complete for their intended purpose; and 5. Conflicts between the Shop Drawing related to the various Subcontractors and Suppliers have been resolved. F. Review Shop Drawings prior to submitting to the Designer. Certify that all Shop Drawings have been reviewed by the Contractor and are in strict conformance with the Contract Documents as modified by Addenda, Change Order, Field Order, or Contract Amendment when submitting Shop Drawings except for deviations specifically brought to the Designer's attention on an attached Shop Drawing Deviation Request form in accordance with Paragraph 1.10. Shop drawings 01 33 02 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 G. Fabrication or installation of any products prior to the approval of Shop Drawings is done at the Contractor's risk. Defective products may be rejected at the Owner's option. H. Payment will not be made for products for which Shop Drawings or Samples are required until these are approved by the Designer. 1.04 SHOP DRAWING REQUIREMENTS A. Provide adequate information in Shop Drawings and Samples so Designer can: 1. Assist the Owner in selecting colors, textures, or other aesthetic features. 2. Compare the proposed features of the product with the specified features and advise Owner that the product does, in general, conform to the Contract Documents. 3, Compare the performance features of the proposed product with those specified and advise the Owner that the product does, in general, conform to the performance criteria specified in the Contract Documents. 4. Review required certifications, guarantees, warranties, and service agreements for compliance with the Contract Documents. B. Include a complete description of the product to be furnished, including: 1. Type, dimensions, size, arrangement, and operational characteristics of the product; 2. Weights, gauges, materials of construction, external connections, anchors, and supports required; 3. All applicable standards such as ASTM or Federal specification numbers; 4. Fabrication and installation drawings, setting diagrams, manufacturing instructions, templates, patterns, and coordination drawings; 5. Mix designs for concrete, asphalt, or other materials proportioned for the Project; and 6. Complete and accurate field measurements for products which must fit existing conditions. Indicate on the document submittal that the measurements represent actual dimensions obtained at the Site. C. Submit Shop Drawings that require coordination with other Shop Drawings at the same time. Shop Drawings requiring coordination with other Shop Drawings will be rejected until a complete package is submitted. 1.05 SPECIAL CERTIFICATIONS AND REPORTS A. Provide all required certifications with the Shop Drawings as specified in the individual Specification Sections: 1. Certified Test Reports (CTR): A report prepared by an approved testing agency giving results of tests performed on products to indicate their compliance with the Specifications. This report is to demonstrate that the product when installed will meet the requirements and is part of the Shop Drawing. Field tests may be performed by the Owner to determine that in place materials or products meet the same quality as indicated in the CTR submitted as part of the Shop Drawing. Shop drawings 01 33 02 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 2. Certification of Local Field Service (CLS): A certified letter stating that field service is available from a factory or supplier approved service organization located within a 300 mile radius of the Site. List names, addresses, and telephone numbers of approved service organizations on or attach it to the certificate. 3. Certification of Adequacy of Design (CAD): A certified letter from the manufacturer of the equipment stating that they have designed the equipment to be structurally stable and to withstand all imposed loads without deformation, failure, or adverse effects to the performance and operational requirements of the unit. The letter shall state that mechanical and electrical equipment is adequately sized to be fully operational for the conditions specified or normally encountered by the product's intended use. 1.06 WARRANTIES AND GUARANTEES A. Provide all required warranties, guarantees, and related documents with the Shop Drawing. The effective date of warranties and guarantees will be the date of acceptance of the Work by the Owner. B. Identify all Extended Warranties, defined as any guarantee of performance for the product or system beyond the 1 year correction period described in the General Conditions. Issue the warranty certificate in the name of the Owner. Provide a Warranty Bond for Extended Warranties if required by Specification Sections. C. Provide a copy of all warranties in a separate document in accordance with SECTION 01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS. 1.07 SHOP DRAWING SUBMITTAL PROCEDURES A. Submit Shop Drawings through the Designer. Send all documents in digital format for processing. 1. Provide all information requested in the Shop Drawing submittal form. Do not leave any blanks incomplete. If information is not applicable, enter NA in the space provided. The Shop Drawing submittal form is to be the first document in the file submitted. 2. Submit all documents in Portable Document Format (PDF). a. Create PDF document using Bluebeam Revu software or other compatible software that will create files that can be opened and annotated using Bluebeam Revu software. b. Create PDF documents from native format files unless files are only available from scanned documents. c. Rotate pages so that the top of each document appears at the top of the monitor screen when opened in PDF viewing software. d. Submit PDF document with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. e. Submit color PDF documents where color is required to interpret the Shop Drawing. Submit Samples and color charts per Paragraph 1.08.A. Shop drawings 01 33 02 - 4 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 f. Create or convert documents to allow text to be selected for comments or searched using text search features. Run scanned documents through Optical Character Recognition (OCR) software if necessary. Flatten markups in documents to prevent markups made by Contractor from being moved or deleted. Flatten documents to allow markup recovery. h. Use Bluebeam Revu software to reduce file size using default settings except the option for "Drop Metadata." Uncheck the "Drop Metadata" box when reducing file size. g. i. Add footers to each document with the Project name. 3. Submit each specific product or class of material separately so these can be tracked and processed independently. Do not submit Shop Drawings for more than one product in the same Shop Drawing. 4. Submit items specified in different Specification Sections separately unless they are part of an integrated system. 5. Define abbreviations and symbols used in Shop Drawings. a. Use terms and symbols in Shop Drawings consistent with the Contract Drawings. b. Provide a list of abbreviations and their meaning as used in the Shop Drawings. c. Provide a legend for symbols used on Shop Drawings. 6. Mark Shop Drawings to reference: a. Related Specification Sections, b. Drawing number and detail designation, c. Product designation or name, d. Schedule references, e. System into which the product is incorporated, and f. Location where the product is incorporated into the Project. B. Use the following conventions to markup Shop Drawings for review: 1. Make comments and corrections in the color blue. Add explanatory comments to the markup. 2. Highlight items in black that are not being furnished when the Supplier's standard drawings or information sheets are provided so that only the products to be provided are in their original color. 3. Make comments in the color yellow where selections or decisions by the Designer are required, but such selections do not constitute a deviation from the Contract Documents. Add explanatory comments to the markup to indicate the action to be taken by the Designer. 4. Make comments in the color orange that are deviation requests. Include the deviation request number on the Shop Drawing that corresponds to the deviation request on Shop drawings 01 33 02 - 5 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 the Shop Drawing Deviation Request form. Include explanatory comments in the Shop Drawing Deviation Request form. 5. Mark dimensions with the prefix FD to indicate field verified dimensions on the Shop Drawings. C. Submit a Change Proposal per SECTION 01 31 14 CHANGE MANAGEMENT to request modifications to the Contract Documents, including those for approval of "or equal" products when specifically allowed by the Contract Documents or as a substitution for specified products or procedures. D. Designate a Shop Drawing as requiring priority treatment in the comment section of the Shop Drawing submittal form to place the review of the Shop Drawing ahead of other Shop Drawings previously delivered. Shop Drawings are typically reviewed in the order received, unless Contractor requests that a different priority be assigned. Priority Shop Drawings will be reviewed before other Shop Drawings for this Project already received but not yet reviewed. Use of this priority designation for Shop Drawings may delay the review of Shop Drawings previously submitted, pushing the processing of Shop Drawings beyond the 14 day target. Contractor is responsible for delays resulting from the use of the priority designation status on Shop Drawings. E. Complete the certification required by Paragraph 1.03. 1.08 SAMPLE AND MOCKUP SUBMITTAL PROCEDURES A. Submit color charts and Samples for every product requiring color, texture, or finish selection. 1. Submit color charts and Samples only after Shop Drawings for the products have been approved. 2. Deliver all color charts and Samples at one time. 3. Provide Samples of adequate size to clearly illustrate the functional characteristics of the product, with integrally related parts and attachment devices. 4. Indicate the full range of color, texture, and patterns. 5. Deliver color charts and Samples to the field office and store for the duration of the Project 6. Notify the Designer that color charts and Samples have been delivered for approval using the Notification by Contractor form. 7. Submit color charts and Samples not less than 30 days prior to when these products are to be ordered or released for fabrication to comply with the Project schedule. 8. Remove Samples that have been rejected. Submit new Samples following the same process as for the initial Sample until Samples are approved. 9. Dispose of Samples when related Work has been completed and approved and disposal is approved by the Designer. At Owner's option, Samples will become the property of the Owner. B. Construct mockups for comparison with the Work being performed. Shop drawings 01 33 02 - 6 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 1. Construct mockups from the actual products to be used in construction per detailed Specification Sections. 2. Construct mockups of the size and in the area indicated in the Contract Documents. 3. Construct mockups complete with texture and finish to represent the finished product. 4. Notify the Designer that mockups have been constructed and are ready for approval using the Notification by Contractor form. Allow 2 weeks for OPT to approve of the mockup before beginning the Work represented by the mockup. 5. Remove mockups that have been rejected. Construct new mockups following the same process as for the initial mockup until mockup is approved. 6. Protect mockups until Work has been completed and accepted by the OPT. 7. Dispose of mockups when related Work has been completed and disposal is approved by the Designer. 1.09 REQUESTS FOR DEVIATION A. Submit requests for deviation from the Contract Documents for any product that does not fully comply with the Contract Documents. B. Submit requests for deviation using the Shop Drawing Deviation Request form provided. Identify each deviation request as a separate item. Include all requested deviations that must be approved as a group together and identify them as a single item. C. Include a description of why the deviation is required and the impact on Contract Price or Contract Times. Include the amount of any cost savings to the Owner for deviations that result in a reduction in cost. D. Submit as a Change Proposal prior to submitting the Shop Drawing if the deviation will result in a change in Contract Price or Contract Times. E. A Modification must be issued by the Designer for approval of a deviation. Approval of a requested Shop Drawing deviation by the Designer on the Shop Drawings Deviation Request form indicates approval of the requested deviation only on its technical merits as generally conforming to the Contract Documents. Deviations from the Contract Documents can only be approved by a Modification. 1.10 DESIGNER RESPONSIBILITIES A. Shop Drawings will be received by the Designer. Designer will log the documents and review per this Section for general conformance with the Contract Documents. 1. Designer's review and approval will be only to determine if the products described in the Shop Drawing or Sample will, after installation or incorporation into the Work, conform to the information given in the Contract. Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. Designer's review and approval will not extend to means, methods, techniques, sequences, or procedures of construction or to safety precautions or programs incident thereto. Shop drawings 01 33 02 - 7 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 3. Designer's review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. B. Comments will be made on items called to the attention of the Designer for review and comment. Any marks made by the Designer do not constitute a blanket review of the document submittal or relieve the Contractor from responsibility for errors or deviations from the Contract requirements. 1. Designer will respond to Contractor's markups by either making markups directly in the Shop Drawings file using the color green or by attaching a Document Review Comments form with review comments. 2. Shop Drawings that are reviewed will be returned with one or more of the following status designations: a. Approved: Shop Drawing is found to be acceptable as submitted. b. Approved as Noted: Shop Drawing is Approved so long as corrections or notations made by Designer are incorporated into the Show Drawing. c. Not Approved: Shop Drawing or products described are not acceptable. 3. Shop Drawing will also be designated for one of the following actions: a. Final distribution: Shop Drawing is acceptable without further action and has been filed as a record document. b. Shop Drawing not required: A Shop Drawing was not required by the Contract Documents. Resubmit the document per SECTION 0133 03 RECORD DATA. c. Cancelled: This action indicates that for some reason, the Shop Drawing is to be removed from consideration and all efforts regarding the processing of that document are to cease. d. Revise and resubmit: Shop Drawing has deviations from the Contract Documents, significant errors, or is inadequate and must be revised and resubmitted for subsequent review. e. Resubmit with corrections made: Shop Drawing is "Approved as Noted," but has significant markups. Make correction and notations to provide a revised document with markup incorporated into the original document so that no markups are required. f. Returned without review due to excessive deficiencies: Document does not meet the requirement of the Specifications for presentation or content to the point where continuing to review the document would be counterproductive to the review process or clearly does not meet the requirements of the Contract Documents. Revise the Shop Drawing to comply with the requirements of this Section and resubmit. g. Actions a through c will close out the Shop Drawing review process and no further action is required as a Shop Drawing. Actions d through f require follow up action to close out the review process. 4. Drawings with a significant or substantial number of markings by the Contractor may be marked "Approved as Noted" and "Resubmit with corrections made." These Shop drawings 01 33 02 - 8 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 drawings are to be revised to provide a clean record of the Shop Drawing. Proceed with ordering products as the documents are revised. 5. Dimensions or other data that does not appear to conform to the Contract Documents will be marked as "At Variance With" (AVW) the Contract Documents or other information provided. The Contractor is to make revisions as appropriate to comply with the Contract Documents. C. Bring deviations to the Shop Drawings to the attention of the Designer for approval by using the Shop Drawing Deviation Request form. Use a single line for each requested deviation so the Status and Action for each deviation can be determined for that requested deviation. If approval or rejection of a requested deviation will impact other requested deviations, then all related deviations should be included in that requested deviation line so the status and action can be determined on the requested deviation as a whole. D. Requested deviations will be reviewed as possible Modification to the Contract Documents. 1. A Requested deviation will be rejected as "Not Approved" if the requested deviation is unacceptable. Contractor is to revise and resubmit the Shop Drawing with corrections for approval. 2. A Field Order will be issued by the Designer for deviations approved by the Designer if the requested deviation is acceptable and if the requested deviation will not result in a change in Contract Price or Contract Times. Requested deviations from the Contract Documents may only be approved by Field Order. 3. A requested deviation will be rejected if the requested deviation is acceptable but the requested deviation will or should result in a change in Contract Price or Contract Times. Submit any requested deviation that requires as change in Contract Price or Contract Times as a Change Proposal for approval prior to resubmitting the Shop Drawing. E. Contractor is to resubmit the Shop Drawing until it is acceptable and marked Approved or Approved as Noted and is assigned an action per Paragraph 1.10.8 that indicates that the Shop Drawing process is closed. F. Information that is submitted as a Shop Drawings that should be submitted as Record Data or other type of document, or is not required may be returned without review, or may be deleted. No further action is required and the Shop Drawing process for this document will be closed. 1.11 RESUBMISSION REQUIREMENTS A. Make all corrections or changes in the documents required by the Designer and resubmit to the Designer until approved. 1. Revise initial drawings or data and resubmit as specified for the original document. 2. Highlight or cloud in green those revisions which have been made in response to the previous reviews by the Designer. This will include changes previously highlighted or clouded in yellow to direct attention to Designer to items requiring selections or decisions by the Designer or highlighted or clouded in orange for a requested deviation from the Contract Documents. Shop drawings 01 33 02 - 9 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 3. Highlight and cloud new items in yellow where selections or decisions by the Designer are required, but such selections do not constitute a deviation from the Contract Documents. Add explanatory comments to the markup to indicate the action to be taken by the Designer. 4. Highlight and cloud new items in orange that are deviation requests. Include the deviation request number on the Shop Drawing that corresponds to the deviation request on the Shop Drawing Deviation Request form. Numbering for these new items is to start with the next number following the last Shop Drawing deviation requested. Include explanatory comments in the Shop Drawing Deviation Request form. B. Pay for excessive review of Shop Drawings. 1. Excessive review of Shop Drawings is defined as any review required after the original review has been made and the first resubmittal has been checked to see that corrections have been made. 2. Review of Shop Drawings or Samples will be an additional service requiring payment by the Contractor if the Contractor submits a substitution for a product for which a Shop Drawing or Sample has previously been approved, unless the need for such change is beyond the control of Contractor. 3. Cost for additional review time will be billed to the Owner by the Designer for the actual hours required for the review of Shop Drawings by Designer and in accordance with the rates listed in SECTION 00 73 00 SUPPLEMENTARY CONDITIONS. 4. A Set-off will be included in each Application for Payment to pay cost for the additional review to the Owner on a monthly basis. The Set-off will be based on invoices submitted to Owner for these services. 5. Need for more than one resubmission or any other delay of obtaining Designer's review of Shop Drawings will not entitle the Contractor to an adjustment in Contract Price or an extension of Contract Times. 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Shop drawings 01 33 02 -10 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 01 33 03 RECORD DATA 1.00 GENERAL 1.01 WORK INCLUDED A. Submit Record Data as required by the Contract Documents and as reasonably requested by the OPT. Provide Record Data for all products unless a Shop Drawing is required for the same item. B. Submit Record Data to provide documents that allow the Owner to: 1. Record the products incorporated into the Project for the Owner; 2. Review detailed information about the products regarding their fabrication, installation, commissioning, and testing; and 3. Provide replacement or repair of the products at some future date. C. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the receipt or cursory review of Record Data. Contract modifications can only be approved by Change Order or Field Order. D. Provide various reports or other documents that Contract Documents required be submitted for record purposes. 1.02 QUALITY ASSURANCE A. Submit legible, accurate, and complete documents presented in a clear, easily understood manner. Record Data not meeting these criteria will be rejected. 1.03 CONTRACTOR'S RESPONSIBILITIES A. Submit Record Data for the following items: As required by specification section 46 7611 B. Include Record Data in the Schedule of Documents required by SECTION 0133 00 DOCUMENT MANAGEMENT to indicate the Record Data to be submitted, the dates on which documents are to be sent to the Designer for review, and proposed dates that the product will be incorporated into the Project. C. Complete the following before submitting Record Data: 1. Prepare Record Data and coordinate with Shop Drawings or Samples, other Record Data, and with the requirements of the Work and the Contract Documents; 2. Determine and verify specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information; 3. Determine and verify the suitability of materials and equipment offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and Record Data O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 013303-1 11-25-2013 4. Determine and verify information relative to Contractor's responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto. D. Determine and verify: 1. Accurate field measurements, quantities, and dimensions are shown on the Record Data; 2. Location of existing structures, utilities, and equipment related to the Record Data have been shown and conflicts between the products existing structures, utilities, and equipment have been identified; 3. Conflicts that impact the installation of the products have been brought to the attention of the OPT through the Designer; 4. Record Data are complete for their intended purpose; and 5. Conflicts between the Record Data related to the various Subcontractors and Suppliers have been resolved. E. Review Record Data prior to submitting to the Designer. Certify that all Record Data has been reviewed by the Contractor and is in strict conformance with the Contract Documents as modified by Addenda, Change Order, Field Order, or Contract Amendment when submitting Record Data. 1.04 RECORD DATA REQUIREMENTS A. Include a complete description of the material or equipment to be furnished, including: 1. Type, dimensions, size, arrangement, model number, and operational parameters of the components; 2. Weights, gauges, materials of construction, external connections, anchors, and supports required; 3. All applicable standards such as ASTM or Federal specification numbers; 4. Fabrication and installation drawings, setting diagrams, manufacturing instructions, templates, patterns, and coordination drawings; 5. Mix designs for concrete, asphalt, or other materials proportioned for the Project; and 6. Complete and accurate field measurements for products which must fit existing conditions. Indicate on the document submittal that the measurements represent. actual dimensions obtained at the Site. 1.05 SPECIAL CERTIFICATIONS AND REPORTS A. Provide all required certifications with the Record Data as specified in the individual Specification Sections: 1. Certified Test Reports (CTR): A report prepared by an approved testing agency giving results of tests performed on products to indicate their compliance with the Specifications. This report is to demonstrate that the product when installed will meet the requirements and is part of the Record Data. Field tests may be performed by the Record Data O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 013303-2 11-25-2013 Owner to determine that in place materials or products meet the same quality as indicated in the CTR submitted as part of the Record Data. 1.06 WARRANTIES AND GUARANTEES A. Provide all required warranties, guarantees, and related documents with the Record Data. The effective date of warranties and guarantees will be the date of acceptance of the Work by the Owner. B. Identify all Extended Warranties, defined as any guarantee of performance for the product or system beyond the 1 year correction period described in the General Conditions. Issue the warranty certificate in the name of the Owner. Provide a Warranty Bond for Extended Warranties if required by Specification Sections. C. Provide a copy of all warranties in a separate document in accordance with SECTION 0170 00 EXECUTION AND CLOSEOUT REQUIREMENTS. 1.07 RECORD DATA SUBMITTAL PROCEDURES A. Submit Record Data through the Designer. Send all documents in digital format for processing. 1. Provide all information requested in the Record Data submittal form. Do not leave any blanks incomplete. If information is not applicable, enter NA in the space provided. The Record Data submittal form is to be the first document in the file. 2. Submit all documents in Portable Document Format (PDF). a. Create PDF document using Bluebeam Revu software or other compatible software that will create files that can be opened and annotated using Bluebeam Revu software. b. Create PDF documents from native format files unless files are only available from scanned documents. c. Rotate pages so that the top of each document appears at the top of the monitor screen when opened in PDF viewing software. d. Submit PDF document with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. e. Submit color PDF documents where color is required to interpret the Record Data. f. Create or convert documents to allow text to be selected for comments or searched using text search features. Run scanned documents through Optical Character Recognition (OCR) software if necessary. Flatten markups in documents to prevent markups made by Contractor from being moved or deleted. Flatten documents to allow markup recovery. h. Use Bluebeam Revu software to reduce file size using default settings except the option for "Drop Metadata." Uncheck the "Drop Metadata" box when reducing file size. g. Record Data O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 013303-3 11-25-2013 i. Add footers to each document with the Project name. 3. Submit each specific product, class of material, or product separately so these can be tracked and processed independently. Do not submit Record Data for more than one system in the same Record Data. 4. Submit items specified in different Specification Sections separately unless they are part of an integrated system. 5. Define abbreviations and symbols used in Record Data. a. Use terms and symbols in Record Data consistent with the Contract Drawings. b. Provide a list of abbreviations and their meaning as used in the Record Data. c. Provide a legend for symbols used on Record Data. 6. Mark Record Data to reference: a. Related Specification Sections, b. Drawing number and detail designation, c. Product designation or name, d. Schedule references, e. System into which the product is incorporated, and f. Location where the product is incorporated into the Project. B. Submit a Change Proposal per SECTION 01 31 14 CHANGE MANAGEMENT to request modifications to the Contract Documents, including those for approval of "or equal" products when specifically allowed by the Contract Documents or as a substitution for specified products or procedures. Deviations from the Contract Documents can only be approved by a Modification. C. Complete the certification required by Paragraph 1.03. 1.08 DESIGNER'S RESPONSIBILITIES A. Record Data will be received by the Designer, logged, and provided to Owner as the Project record. 1. Record Data may be reviewed to see that the information provided is adequate for the purpose intended. Record Data not meeting the requirements of Paragraph 1.02 may be rejected as unacceptable. 2. Record Data is not reviewed for compliance with the Contract Documents. Comments may be returned if deviations from the Contract Documents are noted during the cursory review performed to see that the information is adequate. 3. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the review of Record Data. Contract modifications can only be approved by a Modification. B. Designer may take the following action in processing Record Data: Record Data O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 013303-4 11-25-2013 1. File Record Data as received if the cursory review indicates that the document meets the requirements of Paragraph 1.02. Document will be given the status of "Filed as Received" and not further action is required on that Record Data. 2. Reject the Record Data for one of the following reasons: a. The document submittal requirements of the Contract Documents indicate that the document submitted as Record Data should have been submitted as a Shop Drawing. The Record Data will be marked "Rejected" and "Submit Shop Drawing." No further action is required on this document as Record Data and the Record Data process will be closed. Resubmit the document as a Shop Drawing per SECTION 0133 02 SHOP DRAWINGS. b. The cursory review indicates that the document does not meet the requirements of Paragraph 1.02. The Record Data will be marked "Rejected" and "Revise and Resubmit." Contractor is to resubmit the Record Data until it is acceptable and marked "Filed as Received." When Record Data is filed, no further action is required and the Record Data process will be closed. The Record Data is not required by the Contract Documents nor is applicable to the Project. The Record Data will be marked "Rejected" and "Cancel - Not Required." No further action is required and the Record Data process will be closed. c. C. Contractor is to resubmit the Record Data until it is acceptable and marked "Filed as Received." 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Record Data 01 33 03 - 5 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 01 33 04 CONSTRUCTION PROGRESS SCHEDULE 1.00 GENERAL 1.01 REQUIREMENTS A. Prepare and submit a Progress Schedule for the Work and update the schedule on a monthly basis for the duration of the Project. B. Provide schedule in adequate detail to allow Owner to monitor progress and to relate document processing to sequential activities of the Work. C. Incorporate and specifically designate the dates of anticipated submission of documents and the dates when documents must be returned to the Contractor into the schedule. D. Assume complete responsibility for maintaining the progress of the Work per the schedule submitted. E. Take the requirements of SECTION 0135 00 SPECIAL PROCEDURES into consideration when preparing schedule. 1.02 DOCUMENT SUBMITTAL A. Submit Progress Schedules in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT. B. Submit a preliminary schedule within 10 days after the Notice of Award. The schedule is to be available at the pre -construction conference. C. Submit a detailed schedule at least 10 days prior to the first payment request. D. Submit Progress Schedules updates monthly with Applications for Payment to indicate the progress made on the Project to that date. Failure to submit the schedule may cause delay in the review and approval of Applications for Payment. 1.03 SCHEDULE REQUIREMENTS A. Schedule is to be in adequate detail to: 1. Assure adequate planning, scheduling, and reporting during the execution of the Work; 2. Assure the coordination of the Work of the Contractor and the various Subcontractors and Suppliers; 3. Assist in monitoring the progress of the Work; and 4. Assist in evaluating proposed changes to the Contract Times and Project schedule. B. Provide personnel with 5 years' minimum experience in scheduling construction work comparable to this Project. Prepare the schedule using acceptable scheduling software. C. Provide the schedule in the form of a computer generated critical path schedule which includes Work to be performed on the Project. It is intended that the schedule accomplish the following: 1. Give early warning of delays in time for correction. Construction Progress Schedule 01 33 04 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 2. Provide detailed plans for the execution of the Work in the form of future activities and events in sequential relationships. 3. Establish relationships of significant planned Work activities and provide a logical sequence for planned Work activities. 4. Provide continuous current status information. 5. Allow analysis of the Contractor's program for the completion of the Project. 6. Permit schedules to be revise when the existing schedule is not achievable. 7. Log the progress of the Work as it actually occurs. D. Prepare a time scaled CPM arrow or precedence diagram to indicate each activity and its start and stop dates. 1. Develop Milestone dates and Project completion dates to conform to time constraints, sequencing requirements and Contract completion date. 2. Use calendar day durations while accounting for holidays and weather conditions in the projection of the duration of each activity. 3. Clearly indicate the critical path for Work to complete the Project. E. Provide a time scaled horizontal bar chart which indicates graphically the Work scheduled at any time during the Project. The chart is to indicate: 1. Complete sequence of construction by activity; 2. Identification of the activity by structure, location, and type of Work; 3. Chronological order of the start of each item of Work; 4. The activity start and stop dates; 5. The activity duration; 6. Successor and predecessor relationships for each activity; 7. A clearly indicated single critical path; and 8. Projected percentage of completion, based on dollar value of the Work included in each activity as of the first day of each month. F. Provide a schedule incorporating the Schedule of Documents provided in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT indicating: 1. Specific dates each document is to be delivered to the Designer. 2. Specific dates each document must be received in order to meet the proposed schedule. 3. Allow a reasonable time to review documents, taking into consideration the size and complexity of the document, other documents being processed, and other factors that may affect review time. 4. Allow time for re -submission of the each document. Contractor is responsible for delays associated with additional time required to review incomplete or erroneous Construction Progress Schedule 01 33 04 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 documents and for time lost when documents are submitted for products that do not. meet Specification requirements. 1.04 SCHEDULE REVISIONS A. Revise the schedule if it appears that the schedule no longer represents the actual progress of the Work. 1. Submit a written report if the schedule indicates that the Project is more than 30 days behind schedule. The report is to include: a. Number of days behind schedule; b. Narrative description of the steps to be taken to bring the Project back on schedule; and c. Anticipated time required to bring the Project back on schedule. 2. Submit a revised schedule indicating the action that the Contractor proposes to take to bring the Project back on schedule. B. Revise the schedule to indicate any adjustments in Contract Times approved by Modification. 1. Include a revised schedule with Change Proposals if a change in Contract Times is requested. 2. OPT will deem any Change Proposal that does not have a revised schedule and request for a change in Contract Times as having no impact on the ability of the Contractor to complete the Project within the Contract Times. C. Updating the Project schedule to reflect actual progress is not considered a revision to the Project schedule. D. Applications for Payment may not be recommended for payment without a revised schedule and if required, the report indicating the Contractor's plan for bringing the Project back on schedule. 1.05 FLOAT TIME A. Define float time as the amount of time between the earliest start date and the latest start date of a chain of activities on the construction schedule. B. Float time is not for the exclusive use or benefit of either the Contractor or Owner. C. Where several subsystems each have a critical path, the subsystem with the longest time of completion is the critical path and float time is to be assigned to other subsystems. D. Contract Times cannot be changed by the submission of a schedule. Contract Times can only be modified by a Change Order or Contract Amendment. E. Schedule completion date must be the same as the Contract completion date. Time between the end of construction and the Contract completion date is float time. Construction Progress Schedule 01 33 04 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Construction Progress Schedule 01 33 04 - 4 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 01 33 05 VIDEO AND PHOTOGRAPHIC DOCUMENTATION 1.00 GENERAL 1.01 WORK INCLUDED A. Provide a video recording of the Site prior to the beginning of construction. 1. Record the condition of all existing facilities in or abutting the construction area (right- of-way) including but not limited to streets, curb and gutter, utilities, driveways, fencing, landscaping, etc. 2. Record after construction staking is complete but prior to any clearing. 3. Provide one copy of the recording, dated and labeled to the OAR before the start of construction. Provide additional recording as directed by the OAR if the recording provided is not considered suitable for the purpose of recording pre-existing conditions. B. Furnish an adequate number of photographs of the Site to clearly depict the completed Project. 1. Provide a minimum of ten different views. 2. Photograph a panoramic view of the entire Site. 3. Photograph all significant areas of completed construction. 4. Completion photographs are not to be taken until all construction trailers, excess materials, trash, and debris have been removed. 5. Employ a professional photographer approved by the OAR to photograph the Project. 6. Provide one aerial photograph of the Site from an angle and height to include the entire Site while providing adequate detail. C. All photographs, video recordings, and a digital copy of this media are to become the property of the Owner. Photographs or recordings may not be used for publication, or public or private display without the written consent of the Owner. 1.02 QUALITY ASSURANCE A. Provide clear photographs and recordings taken with proper exposure. View photographs and recordings in the field and take new photographs or recordings immediately if photos of an adequate print quality cannot be produced or video quality is not adequate. Provide photographs with adequate quality and resolution to permit enlargements. 1.03 DOCUMENT SUBMITTAL A. Submit photographic documentation as Record Data in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT. B. Submit two DVDs of the video recording as Record Data in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT. Video and Photographic documentation 01 33 05 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 2.00 PRODUCTS 2.01 PHOTOGRAPHS A. Provide photographs in digital format with a minimum resolution of 1280 x 960, accomplished without a digital zoom. B. Take photographs at locations acceptable to the OAR. C. Provide two color prints of each photograph and a digital copy on a DVD of each photograph taken. D. Identify each print on back with: 1. Project name. 2. Date, time, location, and orientation of the exposure. 3. Description of the subject of photograph. E. Submit photograph in clear plastic sheets designed for photographs. Place only one photograph in each sheet to allow the description on the back to be read without removing the photograph. F. Final photographs are to include two 8 -by -10 -inch glossy color prints for each of ten photographs selected by the OAR. These photographs are in addition to normal prints. 2.02 VIDEO RECORDING A. Provide digital format on DVD that can be played with Windows Media Player in common format in full screen mode. B. Identify Project on video by audio or visual means. C. Video file size should not exceed 400 MB. D. Video resolution shall be 1080p. E. The quality of the video must be sufficient to determine the existing conditions of the construction area. Camera panning must be performed while at rest, do not pan the camera while walking or driving. Camera pans should be performed at intervals sufficient to clearly view the entire construction area. F. DVD shall be labeled with construction stationing and stationing should be called out, voice recorded, in the video. G. The entire construction area recording shall be submitted at once. Sections submitted separately will not be accepted. H. Pipeline projects should be recorded linearly from beginning to end. 3.00 EXECUTION (NOT USED) END OF SECTION Video and Photographic documentation 01 33 05 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 01 35 00 SPECIAL PROCEDURES 1.00 GENERAL Work shall be completed within the specified time for these items: Description Time Milestone #1 = 3,000 Dry Tons (DT) Removed 130 Days Milestone #2 = 6,000 DT Removed 230 Days Milestone #3 = Substantial Completion = 10,000 DT Removed 365 Days A. Consider the sequences, duration limitations, and governing factors outlined in this Section to prepare the schedule for the Work. B. Perform the Work not specifically described in this Section as required to complete the entire Project within the Contract Times. 1.02 PLAN OF ACTION A. Submit a written plan of action for approval for shutting down cxcntial services. These include: 1. Electrical power, =—Control power, 3. Pipelines or wastewater systems, 1. Communications equipment, and 5. Other designated functions. B. Describe the following in the plan of action: 1. Scheduled dates for construction; 2. Work to be performed; 3. Utilities, piping, or services affected; 4. Length of time the service or utility will be disturbed; 5. Procedures to be used to carry out the Work; 6. Plan of Action to handle emergencies; 7. List of manpower, equipment, and ancillary supplies; 8. Backups for key pieces of equipment and key personnel; 9. Contingency plan that will be used if the original schedule cannot be met; and C. Submit plan 1 month prior to beginning the Work. Special Procedures 01 35 00 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 1.03 CRITICAL OPERATIONS A. The Owner has identified critical operations that must not be out of service longer than the designated maximum time out of service and/or must be performed only during the designated times. These have been identified below: Lagoon #7 (Washwater Return Basin) may not be taken out of service for any period of time. B. Submit a written plan of action per Paragraph 1.02 for approval for critical operations. C. Work affecting critical operations is to be performed on a 24-hour a day basis until Owner's normal operations have been restored. D. Provide additional manpower and equipment as required to complete the Work affecting critical operations within the allotted time. E. Liquidated damages will be assessed if Work on critical operations is not completed within the time indicated. 1. These items are critical to the operation of the O.N. Stevens Water Treatment Plant. 2. Loss of operation of the O.N. Stevens Water Treatment Plant can subject the Owner to loss of revenue, additional operations cost, and fines from regulatory agencies. 3. Liquidated damages have been established for each critical operation. 4. In lieu of liquidated damages. the Owner may terminate the Agreement in accordance with Article 16 of section 00 72 00 General Conditions if the milestone dates are not met. F. Designated Critical Operations are described in more detail as follows: 1. Critical Operation 1- Milestone #1 = Remove 3,000 Dry Tons: a. It is critical for plant operations that the residuals existing in Lagoon #7 be removed as quickly as possible. Failure of Contractor to remove 3,000 DT or more in the Contract Time established for Milestone #1 will result in proceedings by the Owner to terminate the Agreement. The Contractor will have 7 days, as provided under section 00 72 00 General Conditions Article 16.02, to cure the cause for termination at which point the Owner may elect not to proceed with the termination, if the cause has been sufficiently cured in the opinion of the Owner. 2. Critical Operation 2 - Milestone #2 = 6,000 Dry Tons Removed: a. It is critical for plant operations that the residuals existing in Lagoon #7 be removed as quickly as possible. Failure of Contractor to remove 6,000 DT or more in the Contract Time established for Milestone #2 will result in proceedings by the Owner to terminate the Agreement. The Contractor will have 7 days, as provided under section 00 72 00 General Conditions Article 16.02, to cure the cause for termination at which point the Owner may elect not to proceed with the termination, if the cause has been sufficiently cured in the opinion of the Owner. Additionally, failure by the contractor to meet Milestone #1 does not change the calendar day requirement to rneet Milestone #2. Special Procedures 01 35 00 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 3, Critical Operation 3 - Milestone #3 = Substantial Completion: a. It is critical for plant operations that the residuals existing in Lagoon #7 be removed as quickly as possible. Failure of Contractor to remove the final awarded amount of dry tons in the Contract Time established for Milestone #3 will result in proceedings by the Owner to terminate the Agreement. The Contractor will have 7 days, as provided under section 00 72 00 General Conditions Article 16.02, to cure the cause for termination at which point the Owner may elect not to proceed with the termination, if the cause has been sufficiently cured in the opinion of the Owner. Additionally, failure by the contractor to meet Milestone #1 or Milestone #2 does not change the calendar day requirement to meet Milestone #3. 1,04 OWNER ASSISTANCE A. The Owner will assist the Contractor in draining the existing pipelines as much as possible through existing blow off valves. The Contractor will be responsible for providing dewatering pumps, etc, required to completely dewater the facilities and handle any leakage past closed valves, gates or adjacent structures. 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Special Procedures 01 35 00 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 01 35 00 SPECIAL PROCEDURES 1.00 GENERAL Work shall be completed within the specified time for these items: Description Time Milestone #1 = 3,000 Dry Tons (DT) Removed 130 Days Milestone #2 = 6,000 DT Removed 230 Days Milestone #3 = Substantial Completion = 10,000 DT Removed 365 Days A. Consider the sequences, duration limitations, and governing factors outlined in this Section to prepare the schedule for the Work. B. Perform the Work not specifically described in this Section as required to complete the entire Project within the Contract Times. 1.02 PLAN OF ACTION A. Submit a written plan of action for approval for shutting down cxcntial services. These include: 1. Electrical power, =—Control power, 3. Pipelines or wastewater systems, 1. Communications equipment, and 5. Other designated functions. B. Describe the following in the plan of action: 1. Scheduled dates for construction; 2. Work to be performed; 3. Utilities, piping, or services affected; 4. Length of time the service or utility will be disturbed; 5. Procedures to be used to carry out the Work; 6. Plan of Action to handle emergencies; 7. List of manpower, equipment, and ancillary supplies; 8. Backups for key pieces of equipment and key personnel; 9. Contingency plan that will be used if the original schedule cannot be met; and C. Submit plan 1 month prior to beginning the Work. Special Procedures 01 35 00 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 1.03 CRITICAL OPERATIONS A. The Owner has identified critical operations that must not be out of service longer than the designated maximum time out of service and/or must be performed only during the designated times. These have been identified below: Lagoon #7 (Washwater Return Basin) may not be taken out of service for any period of time. B. Submit a written plan of action per Paragraph 1.02 for approval for critical operations. C. Work affecting critical operations is to be performed on a 24-hour a day basis until Owner's normal operations have been restored. D. Provide additional manpower and equipment as required to complete the Work affecting critical operations within the allotted time. E. Liquidated damages will be assessed if Work on critical operations is not completed within the time indicated. 1. These items are critical to the operation of the O.N. Stevens Water Treatment Plant. 2. Loss of operation of the O.N. Stevens Water Treatment Plant can subject the Owner to loss of revenue, additional operations cost, and fines from regulatory agencies. 3. Liquidated damages have been established for each critical operation. 4. In lieu of liquidated damages. the Owner may terminate the Agreement in accordance with Article 16 of section 00 72 00 General Conditions if the milestone dates are not met. F. Designated Critical Operations are described in more detail as follows: 1. Critical Operation 1- Milestone #1 = Remove 3,000 Dry Tons: a. It is critical for plant operations that the residuals existing in Lagoon #7 be removed as quickly as possible. Failure of Contractor to remove 3,000 DT or more in the Contract Time established for Milestone #1 will result in proceedings by the Owner to terminate the Agreement. The Contractor will have 7 days, as provided under section 00 72 00 General Conditions Article 16.02, to cure the cause for termination at which point the Owner may elect not to proceed with the termination, if the cause has been sufficiently cured in the opinion of the Owner. 2. Critical Operation 2 - Milestone #2 = 6,000 Dry Tons Removed: a. It is critical for plant operations that the residuals existing in Lagoon #7 be removed as quickly as possible. Failure of Contractor to remove 6,000 DT or more in the Contract Time established for Milestone #2 will result in proceedings by the Owner to terminate the Agreement. The Contractor will have 7 days, as provided under section 00 72 00 General Conditions Article 16.02, to cure the cause for termination at which point the Owner may elect not to proceed with the termination, if the cause has been sufficiently cured in the opinion of the Owner. Additionally, failure by the contractor to meet Milestone #1 does not change the calendar day requirement to rneet Milestone #2. Special Procedures 01 35 00 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 3. Critical Operation 3 - Milestone #3 = Substantial Completion: a. It is critical for plant operations that the residuals existing in Lagoon #7 be removed as quickly as possible. Failure of Contractor to remove the final awarded amount of dry tons in the Contract Time established for Milestone #3 will result in proceedings by the Owner to terminate the Agreement. The Contractor will have 7 days, as provided under section 00 72 00 General Conditions Article 16.02, to cure the cause for termination at which point the Owner may elect not to proceed with the termination, if the cause has been sufficiently cured in the opinion of the Owner. Additionally, failure by the contractor to meet Milestone #1 or Milestone #2 does not change the calendar day requirement to meet Milestone #3. 1.04 OWNER ASSISTANCE A. The Owner will assist the Contractor in draining the existing pipelines as much as possible through existing blow off valves. The Contractor will be responsible for providing dewatering pumps, etc. required to completely dewater the facilities and handle any leakage past closed valves, gates or adjacent structures. 1.05 OPTIONAL RENEWAL BY CONTRACT AMENDMENT A. Upon satisfactory Substantial Completion of the Project by the Contractor, in the opinion of the Owner, the Owner may offer to the Contractor the optional contract renewal by proposing a Contract Amendment in accordance with section 00 72 00 General Conditions Articale 11.01 A.1. B. The Contract Amendment will include the following items: 1. Unit price per dry ton as submitted in the Bid Form (Bid Item A-21 in the base contract 2. Revised quantity of dry tons to be removed in the renewal period 3. Revised Contract Time for the renewal period C. Contractor will have the option to: 1. Accept the Contract Amendment 2. Decline the Contract Amendment 3. Counter offer with revised Unit Price, Qauntity, Contract Time or any combination of thereof. D. Unit price per dry ton may only be modified from that of the base contract only by an amount of inflation or other material, labor, or supplies cost increase as negotiated and agreed upon by both Contractor and Owner. E. Contract Price for the Contract Amendment will be the revised quantity of dry tons removed multiplied by the revised unit price per dry tons removed. F. Quantity and Contract Time included in the Contract Amendment may also be negotiated and must be agreed upon by Owner and Contractor. Special Procedures 01 35 00 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 G. Upon agreement between Owner and Contractor to the terms and conditions of the Contract Amendment a new section 00 52 23 Agreement will be issued stating any and all Contract terms and conditions revised from the base contract. H. Any terms and conditions not modified in the Contract Amendment will remain in full force and effect. 1. The Contract Amendment will take effect upon execution of the new Agreement by Owner and Contractor. 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Special Procedures 01 35 00 - 4 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 01 40 00 QUALITY MANAGEMENT 1.00 GENERAL 1.01 CONTRACTOR'S RESPONSIBILITIES A. Review the OPT's Quality Management Program and prepare and submit the Contractor's Quality Control Plan. B. Implement the Contractor's Quality Control Plan to control the quality of the Work and verify that the Work meets the standards of quality established in the Contract Documents. 1. Inspect products to be incorporated into the Project. Ensure that Suppliers have adequate quality control systems to ensure that products that comply with the Contract Documents are provided. 2. Integrate quality control measures into construction activities to produce Work which meets quality expectations of the Contract Documents. Inspect the Work of the Contractor, Subcontractors, and Suppliers. Correct Defective Work. 3. Provide and pay for the services of an approved professional materials testing laboratory acceptable to the OPT to provide testing that demonstrates that products proposed in Shop Drawings and Record Data for the Project fully comply with the Contract Documents. 4. Provide facilities, equipment, and Samples required for quality control inspections and tests: a. Give the OAR adequate notice before proceeding with Work that would interfere with inspections or testing; b. Notify the OAR and testing laboratories prior to the time that testing is required, providing adequate lead time to allow arrangements for inspections or testing to be made; c. Do not proceed with any Work that would impact the ability to correct defects or Work that would require subsequent removal to correct defects until testing services have been performed and results of tests indicate that the Work is acceptable; d. Cooperate fully with the performance of sampling, inspection, and testing; e. Provide personnel to assist with sampling or to assist in making inspections and field tests; f. Obtain and handle Samples for testing at the Site or at the production source of the product to be tested; g. Provide adequate quantities of representative products to be tested to the laboratory at the designated locations; h. Provide facilities required to store and cure test Samples; i. Provide calibrated scales and measuring devices for the OPT's use in performing inspections and testing; Quality Management 0140 00 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 j. Provide adequate lighting to allow OPT observations; and k. Make Contract Documents available to testing agencies when requested. 5. Provide safe access for all inspection and testing activities, including those to be conducted as part of the OPT's Quality Management Program. 6. Document Defective Work though Certified Test Reports and Defective Work Notices. Document that corrective actions have been taken to correct any defects and that corrected Work is in compliance with the Contract Documents. 7. Apply quality control measures to documentation provided for the Project. 8. Implement countermeasures to prevent future Defective Work. C. Perform tests as indicated in this and other Sections of the Specifications. Technical Specifications govern if any testing and inspection requirements of this Section conflict with the testing and inspection requirements of the technical Specifications. D. All verification testing is to be observed by the OAR or designated representative. E. Send test reports to the Designer. F. Provide an update on quality control activities at monthly progress meetings required by SECTION 01 31 13 PROJECT COORDINATION. G. Owner will withhold payment for Defective Work, or Work that has not been tested or inspected in accordance with the Contractor's Quality Control Plan, the OPT's Quality Control Program, or the Contract Documents. H. Work performed that is connected or adjacent to Defective Work or Work that would have to be removed to correct Defective Work is also considered to be Defective. Contractor is responsible for all cost with replacing any acceptable Work that must be removed, or might be damaged by corrective actions. 1.02 QUALITY MANAGEMENT ACTIVITIES BY THE OPT A. OPT will perform its own quality assurance tests independent of the Contractor's Quality Control Program. Assist the OPT and testing organizations in performing quality assurance activities per Paragraph 1.01. B. Quality assurance testing performed by the OPT will be paid for by the Owner, except for verification testing required per Paragraph 1.07. C. Quality assurance activities of the OPT, through their own forces or through contracts with consultants and materials testing laboratories are for the purpose of monitoring the results of the Contractor's Work to see that it is in compliance with the requirements of the Contract Documents. Quality assurance activities or non-performance of quality assurance activities by the OPT do not; 1. Relieve the Contractor of its responsibility to provide Work or furnish products that conform with the requirements of the Contract Documents; 2. Relieve the Contractor of its responsibility for providing adequate quality control measures; Quality Management 0140 00 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 3. Relieve the Contractor of its responsibility for damage to or loss of Work or products before OPT's acceptance; 4. Constitute or imply OPT's acceptance; and 5. Affect the continuing rights of the Owner after OPT's acceptance of the completed Work. D. Work is subject to OPT's quality assurance observations or testing at any time. Products which have been tested or inspected and approved by OPT at a supply source or staging area may be inspected or tested again by the OPT before, during or after incorporation into the Work and rejected if products do not comply with the Contract Documents. 1.03 CONTRACTOR'S USE OF OPT'S TEST REPORTS A. OPT has prepared a Quality Management Plan that describes, in general, the OPT's anticipated quality assurance testing program for this Project. This testing program will be made available to Bidders during the bidding phase. This plan outlines only the testing in general terms and may not reflect actual testing. Actual testing will depend on the Contractors means, methods and procedures of construction which will not be known until the Contractor begins Work and submits their own Quality Control Plan for review. There is no guarantee that all testing will be performed. B. Contractor will receive copies of all test reports documenting OPT's quality assurance activities. Contractor is entitled to rely on the accuracy of these tests results and use these as part of their quality control efforts. C. Contractor is to determine additional testing or inspections that may be required to implement the Contractor's Quality Control Plan. Include cost for additional testing and inspections required to meet Contractors quality control obligations, including the cost for correcting Defective Work in the Contract Price. D. Contractor may submit a Change Proposal if OPT's quality assurance testing program deviates significantly from the OPT's Quality Management Plan, and Contractor can demonstrate that additional cost was incurred to implementing the Contractor's Quality Control Plan resulting from these deviations. 1.04 DOCUMENTATION A. Provide documentation which includes: 1. Contractor's Quality Management Plan that establishes the methods of assuring compliance with the Contract Documents. Submit this plan as a Shop Drawings per SECTION 01 33 02 SHOP DRAWINGS. 2. A Statement of Qualification for any proposed testing laboratories that includes a list of the engineers and technical staff that will provide testing services on the Project, descriptions of the qualifications of these individuals, list of tests that can be performed, equipment used with date of last certification, and a list of recent projects for which testing has been performed with references for those projects. 3. Provide Certified Test Reports for products to be incorporated into the Project. Provide reports to indicate that proposed products comply with the Contract Documents or indicate that proposed products do not comply with the Contract Quality Management 0140 00 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 Documents and why it does not comply. Submit these test reports as part of a Shop Drawings submitted per SECTION 0133 02 SHOP DRAWINGS. 4. Provide Certified Test Reports for inspection and testing required in this Section and in other Specification Sections. Provide reports to indicate that Work complies with the Contract Documents or indicate that Work does not comply with the Contract Documents they are not in compliance and why it does not comply. Submit these test reports on forms provided per SECTION 0133 00 DOCUMENT MANAGEMENT. 1.05 STANDARDS A. Provide testing laboratories that comply with the American Council of Independent Laboratories (ACIL) "Recommended Requirements for Independent Laboratory Qualifications." B. Perform testing per recognized test procedures as listed in the various Sections of the Specifications, standards of the State Department of Highways and Public Transportation, American Society of Testing Materials (ASTM), or other testing associations. Perform tests in accordance with published procedures for testing issued by these organizations. 1.06 DELIVERY AND STORAGE A. Handle and protect test specimens of products and construction materials at the Site in accordance with recognized test procedures. Provide facilities for storing, curing, processing test specimens as required by test standard to maintain the integrity of Samples. 1.07 VERIFICATION TESTING FOR CORRECTED DEFECTS A. Provide verification testing on Work performed to correct Defective Work to demonstrate that the Work is now in compliance with the Contract Documents. Document that Defective Work has been corrected and verify that the OAR closes the item in the Defective Work Register. B. Pay for verification testing. OPT may perform verification testing as part of their Quality Management Program and impose a Set-off to recover the cost for this testing. C. Conduct the same tests or inspections used to determine that the original Work was Defective. Different tests or methods may be used if approved by the OPT. 1.08 TEST REPORTS A. Certified Test Reports are to be prepared for all tests. 1. Tests performed by testing laboratories may be submitted on their standard test report forms if acceptable to the OPT. These reports must include the following: a. Name of the Owner, Project title and number and Contractor; b. Name of the laboratory, address, and telephone number; c. Name and signature of the laboratory personnel performing the test; d. Description of the product being sampled or tested; Quality Management 0140 00 - 4 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 e. Date and time of sampling, inspection, and testing; f. Date the report was issued; g. Description of the test performed; h. Weather conditions and temperature at time of test or sampling; i. Location at the Site or structure where the test was taken; j. Standard or test procedure used in making the test; k. A description of the results of the test; I. Statement of compliance or non-compliance with the Contract. Documents; and m. Interpretations of test results, if appropriate. 2. Submit reports on tests performed by Contractor, Subcontractors or Suppliers on the forms provided by the OAR. 3. OPT will prepare test reports on test performed by the OPT. B. Send test report to Designer within 24 hours of completing the test. Flag tests reports with results that do not comply with Contract Documents for immediate attention. C. Payment for Work may be withheld until test reports indicate that the Work is not Defective. 1.09 DEFECTIVE WORK A. Immediately correct any Defective Work or notify the OAR why the Work is not to be corrected immediately and when corrective action will be completed. B. No payment will be made for Defective Work. Remove Work from the Application for Payment if Work paid for on a previous Application for Payment is found to be Defective. 1.10 LIMITATION OF AUTHORITY OF THE TESTING LABORATORY A. The testing laboratory representatives are limited to providing testing services and interpreting the results of the test performed. B. The testing laboratory is not authorized to: 1. Alter the requirements of the Contract Documents; 2. Accept or reject any portion of the Work; 3. Perform any of the duties of the Contractor; or 4. Direct or stop the Work. 1.11 QUALITY CONTROL PLAN A. Submit the Contractor's Quality Control Plan for approval as a Shop Drawing per SECTION 01 33 02 SHOP DRAWINGS. Use Contractor's Quality Control Plan Checklist provided to review the document before submitting and include a copy of the completed checklist with the Contractor's Quality Control Plan. Do not begin Work until the Contractor's Quality Control Plan is approved. Submit an interim plan covering only the portion of Work to be Quality Management 0140 00 - 5 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 performed if the Contractor plans to begin Work prior to submitting the Contractor's Quality Control Plan for the Project. Do not begin Work on other parts of the Project until the Contractor's Quality Control Plan is approved or another interim plan covering the additional Work to be started is approved. B. Provide a Contractor's Quality Control Plan that incorporates construction operations at both the Site and production Work at remote locations and includes Work by Subcontractors and Suppliers. The Contractor's Quality Control Plan is to include: 1. A description of the quality control organization, including an organization chart showing lines of authority to control the quality of Work; 2. Documentation describing name, qualifications (in resume format), duties, responsibilities, and level of authority of the Quality Control Manager; 3. The name, qualifications (in resume format), duties, responsibilities, and authorities of other persons assigned a quality control function; 4. Procedures for scheduling, reviewing, certifying, and managing documentation, including documentation provided by Subcontractors and Suppliers; 5. Control, verification, and acceptance testing procedures for each specific test. Include: a. Name of tests to be performed, b. Specification paragraph requiring test, c. Parameters of Work to be tested, d. Test frequency, e. Persons responsible for each test, and f. Applicable industry testing standards and laboratory facilities to be used for the test; 6. Integrate the OPT quality assurance testing into the Contractor's Quality Control Plan, specifically identifying the tests or inspections in Paragraph 1.11.B.5 that will be provided by the OPT as part of their Quality Management Program; 7. Procedures for tracking and documenting quality management efforts. 8. Procedures for tracking Defective Work from initial identification through acceptable corrective action. Indicate how documentation of the verification process for deficiencies will be made. 9. Reporting procedures which incorporate the use of forms provided by the OAR. 10. The name of the proposed testing laboratories along with documentation of qualifications per Paragraph 1.04. C. The Quality Control Manager must have authority to reject Defective Work and redirect the efforts of the Contractor's Team to prevent or correct Defective Work. D. Notify the Designer of any changes to the Contractor's Quality Control Plan or quality control personnel. Quality Management 0140 00 - 6 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 E. Meet with the OPT 7 days after Contractor's Quality Control Plan is submitted and before start of construction to discuss the Contractor's Quality Control Plan and expedite its approval. 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION 3.01 IMPLEMENT CONTRACTOR'S QUALITY CONTROL PLAN A. Perform quality control observations and testing as required in each Section of the Specifications and where indicated on the Drawings. B. Includes the following phases for each definable Work task. A definable Work task is one which is separate and distinct from other tasks, has separate control requirements, may be provided by different trades or disciplines, or may be Work by the same trade in a different environment. 1. Planning Phase: Perform the following before beginning each definable Work task: a. Review the Contract Drawings. b. Review documents and determine that they are complete in accordance with the Contract Documents. c. Check to assure that all materials and/or equipment have been tested, submitted, and approved. d. Examine the work area to assure that all required preliminary Work has been completed and complies with the Contract Documents. e. Examine required materials, equipment, and Sample Work to assure that they are on hand, conform to Shop Drawings and Record Data, and are properly stored. f. Review requirements for quality control inspection and testing. g. Discuss procedures for controlling quality of the Work. Document construction tolerances and workmanship standards for the Work task. h. Check that the portion of the plan for the Work to be performed incorporates document review comments. i. Discuss results of planning phase with the OAR. Conduct a meeting attended by the Quality Control Manager, the OAR, superintendent, other quality control personnel as applicable, and the foreman responsible for the Work task. Instruct applicable workers as to the acceptable level of workmanship required in order to meet the requirements of the Contract Documents. Document the results of the preparatory phase actions by separate meeting minutes prepared by the Quality Control Manager and attached to the quality control report. Do not move to the next phase unless results of investigations required for the planning phase indicate that requirements have been met. J. Quality Management 0140 00 - 7 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 2. Work Phase: Complete this phase after the Planning Phase: a. Notify the OAR at least 24 hours in advance of beginning the Work and discuss the review of the planning effort to indicate that requirements have been met. b. Check the Work to ensure that it is in full compliance with the Contract Documents. c. Verify adequacy of controls to ensure full compliance with Contract Documents. Verify required control inspection and testing is performed. d. Verify that established levels of workmanship meet acceptable workmanship standards. Compare with required Sample panels as appropriate. e. Repeat the Work phase for each new crew to work on-site, or any time acceptable specified quality standards are not being met. 3. Follow-up Phase: Perform daily checks to assure control activities, including control testing, are providing continued compliance with contract requirements: a. b. Make checks daily and record observations in the quality control documentation. Conduct follow-up checks and correct all deficiencies prior to the start of additional Work tasks that may be affected by the Defective Work. Do not build upon nor conceal Defective Work. c. Conduct a review of the Work one month prior to the expiration of the correction period prescribed in the General Conditions with the OPT. Correct defects as noted during the review. C. Conduct additional planning and Work phases if: 1. The quality of on-going Work is unacceptable; 2. Changes are made in applicable quality control staff, on-site production supervision or crews; 3. Work on a task is resumed after a substantial period of inactivity; or 4. Other quality problems develop. END OF SECTION Quality Management 0140 00 - 8 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 01 50 00 TEMPORARY FACILITIES AND CONTROLS 1.00 GENERAL 1.01 WORK INCLUDED A. Provide temporary facilities, including OPT's field office and the Contractor's field offices, storage sheds, and temporary utilities needed to complete the Work. B. Install and maintain temporary Project identification signs. Provide temporary on-site informational signs to identify key elements of the construction facilities. Do not allow other signs to be displayed. 1.02 QUALITY ASSURANCE A. Provide a total electrical heating and cooling system for the OPT's field office capable of maintaining the following conditions: 1. Heating: Minimum 75 degrees ID temp at 10 degrees ambient. 2. Cooling: Minimum 75 degrees ID temp at 105 degrees ambient. 3. Relative humidity: 48 to 54 percent. B. Inspect and test each service before placing temporary utilities in use. Arrange for all required inspections and tests by regulatory agencies, and obtain required certifications and permits for use. 1.03 DELIVERY AND STORAGE A. Arrange transportation, loading, and handling of temporary buildings and sheds. 1.04 JOB CONDITIONS A. Locate buildings and sheds at the Site as indicated or as approved by the OPT. B. Prepare the Site by removing trees, brush, or debris and performing demolition or grubbing needed to clear a space adequate for the structures. C. Pay for the utilities used by temporary facilities during construction. D. Provide each temporary service and facility ready for use at each location when the service or facility is first needed to avoid delay in the performance of the Work. Provide OPT's field office complete and ready for occupancy and use within 7 days of the Notice to Proceed. E. Maintain, expand as required, and modify temporary services and facilities as needed throughout the progress of the Work. F. Remove services and facilities when approved by the OAR. G. Operate temporary facilities in a safe and efficient manner. 1. Restrict loads on temporary services or facilities to within their designed or designated capacities. 2. Provide sanitary conditions. Prevent public nuisance or hazardous conditions from developing or existing at the Site. Temporary Facilities and Controls 01 50 00 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 3, Prevent freezing of pipes, flooding, or the contamination of water. 4. Maintain Site security and protection of the facilities. 1.05 OPTIONS A. Construction offices may be prefabricated buildings on skids or mobile trailers. B. Storage sheds may be prefabricated buildings on skids or truck trailers. 2.00 PRODUCTS 2.01 TEMPORARY FIELD OFFICES A. The Contractor must furnish the OPT with a field office at the Site. The field officc must contain at IcNast 120 square fcct of usc`ablc spacc. Thc field office must bc air conditioned and hctiated and must bc furnishcd with an inclined table that mctiasures at least 30 inches, by 60 inches and two chairs. Thc Contractor shall move the field office on the Site a:, required by the OAR. The field office must be furnishcd with a telephone (with 24 hour per day answering service) and fax machine paid for by the Contractor. There is no separate pay item for the field office. B. Furnish a field office of adequate size for Contractor's use. Provide conference room space for a minimum of 15 people. C. Other trades may provide their own offices only when space is available at the Site, and the OPT agrees to its size, condition, and location. D. No monthly partial payments will be processed until OPT's field office facilities are completed and approved. 2.02 TEMPORARY STORAGE BUILDINGS A. Furnish storage buildings of adequate size to store any materials or equipment delivered to the Site that might be affected by weather. 2.03 TEMPORARY SANITARY FACILITIES A. Provide sanitary facilities at the Site from the commencement of the Project until Project conclusion. Maintain these facilities in a clean and sanitary condition at all times, and comply with the requirements of the local health authority. On large sites, provide portable toilets at such locations that no point in the Site shall be more than 600 feet from a toilet. B. Use these sanitary facilities. Do not use restrooms within existing or Owner -occupied buildings. 2.04 TEMPORARY HEAT A. Provide heating devices needed to protect buildings during construction. Provide fuel needed to operate the heating devices and attend the heating devices at all times they are in operation, including overnight operations. Temporary Facilities and Controls 01 50 00 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 2.05 TEMPORARY UTILITIES A. Provide the temporary utilities for administration, construction, testing, disinfection, and start-up of the Work, including electrical power, water, and telephone. Pay all costs associated with furnishing temporary utilities. 1. Provide a source of temporary electrical power of adequate size for construction procedures. a. Use existing power systems where spare capacity is available. Provide temporary power connections that do not adversely affect the existing power supply. Submit connections to the OAR for approval prior to installation. b. Provide electrical pole and service connections that comply with Laws and Regulations and the requirements of the power company. 2. Provide telephone service to the Site and install telephones inside the Contractor's and the OPT's field office. 2.06 WATER FOR CONSTRUCTION A. Provide temporary water. Potable water may be purchased from the Owner by obtaining a water meter from the Owner and transporting water from a water hydrant. Non -potable water may be used for hydraulic testing of non -potable basins or pipelines. Include the cost of water in the Contract Price. B. Contractor must comply with the City of Corpus Christi's Water Conservation and Drought Contingency Plan as amended (the "Plan"). This includes implementing water conservation measures established for changing conditions. The City Engineer will provide a copy of the Plan to Contractor at the pre -construction meeting. The Contractor will keep a copy of the Plan on the Site throughout construction. 3.00 EXECUTION 3.01 LOCATION OF TEMPORARY FACILITIES A. Locate temporary facilities in areas approved by the OAR. Construct and install signs at locations approved by the OAR. Install informational signs so they are clearly visible. 3.02 PROJECT IDENTIFICATION AND SIGNS A. The Owner will furnish two Project signs to be installed by the Contractor. The signs must be installed before construction begins and will be maintained throughout the Project period by the Contractor. The locations of the signs will be determined in the field by the OAR. 3.03 TEMPORARY LIGHTING A. Provide temporary lighting inside buildings once buildings are weatherproof. B. Provide lighting that is adequate to perform Work within any space. Temporary lights may be removed once the permanent lighting is in service. Temporary Facilities and Controls 01 50 00 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 C. Provide portable flood lights at any time that Work will be performed outside the structure at night. Provide adequate lighting at any location Work is being performed. 3.04 DRINKING WATER A. Provide all field offices with potable water. Provide a dispenser and cooling apparatus if bottled drinking water is provided. B. Pay for water services and maintain daily. 3.05 CONSTRUCTION FENCE A. Install and maintain a construction fence around the Site and off-site storage yards. Fence must be a minimum 6 feet high chain link construction unless shown otherwise. Provide gates with padlocks. 3.06 REMOVAL OF TEMPORARY FACILITIES A. Remove temporary buildings, sheds, and utilities at the conclusion of the Project and restore the Site to original condition or finished in accordance with the Drawings. B. Remove informational signs upon completion of construction. C. Remove Project identification signs, framing, supports, and foundations upon completion of the Project. 3.07 MAINTENANCE AND JANITORIAL SERVICE A. Provide janitorial service (sweeping/mopping) for the OPT's field office on a weekly basis or as requested. Empty trash receptacles daily or as needed. B. Maintain signs and supports in a neat, clean condition. Repair damage to structures, framings, or signs. C. Repair any damage to Work caused by placement or removal of temporary signage. D. Service, maintain, and replace, if necessary, the OPT's field office computer equipment throughout the Project as required by the OPT including replacement cartridges for all office equipment. END OF SECTION Temporary Facilities and Controls 01 50 00 - 4 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 01 57 00 TEMPORARY CONTROLS 1.00 GENERAL 1.01 WORK INCLUDED A. Provide labor, materials, equipment, and incidentals necessary to construct temporary facilities to provide and maintain control over environmental conditions at the Site. Remove temporary facilities when no longer needed. B. Construct temporary impounding works, channels, diversions, furnishing and operation of pumps, installing piping and fittings, and other construction for control of conditions at the Site. Remove temporary controls at the end of the Project. C. Provide a Storm Water Pollution Prevention Plan (SWPPP) as required by Texas Pollutant Discharge Elimination System (TPDES) General Permit No. TXR150000 for stormwater discharges from construction activities. Comply with all requirements of the Texas Commission on Environmental Quality (TCEQ) and Laws and Regulations. File required legal notices and obtain required permits prior to beginning any construction activity. D. Provide labor, materials, equipment, and incidentals necessary to prevent stormwater pollution for the duration of the Project. Provide and maintain erosion and sediment control structures as required to preventive sediment and other pollutants from the Site from entering any stormwater system including open channels. Remove pollution control structures when no longer required to prevent stormwater pollution. 1.02 QUALITY ASSURANCE A. Construct and maintain temporary controls with adequate workmanship using durable materials to provide effective environmental management systems meeting the requirements of the Contract Documents and Laws and Regulations. Use materials that require minimal maintenance to prevent disruption of construction activities while providing adequate protection of the environment. B. Periodically inspect systems to determine that they are meeting the requirements of the Contract Documents. 1.03 DOCUMENT SUBMITTAL A. Provide documents requiring approval by the OPT as Shop Drawings in accordance with SECTION 01 33 02 SHOP DRAWINGS. B. Provide copies of notices, records, and reports required by the Contract Documents or Laws and Regulations as Record Data in accordance with SECTION 0133 03 RECORD DATA. 1.04 STANDARDS A. Provide a SWPPP that complies with all requirements of TPDES General Permit No. TXR150000 and any other applicable Laws and Regulations. B. Perform Work to comply with the City of Corpus Christi Code of Ordinances, Part III, Chapter 14, Article X - titled "STORM WATER QUALITY MANAGEMENT PLANS" and any other applicable Laws and Regulations. Temporary Controls 01 57 00 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 1.05 PERMITS A. Submit the following to the TCEQ and the Operator of any Municipal Separate Storm Sewer System (MS4) receiving stormwater discharges from the Site: 1. Notice of Intent (NOI) at least 48 hours prior to beginning construction activity. Construction activity may commence 24 hours after the submittal of an electronic NOI. 2. Notice of Change (NOC) letter when relevant facts or incorrect information was submitted in the NOI, or if relevant information in the NOI changes during the course of construction activity. 3. Notice of Termination (NOT) when the construction Project has been completed and stabilized. B. Post a copy of the NOI at the Site in a location where it is readily available for viewing by the general public and as required by Laws and Regulations prior to starting construction activities and maintain the posting until completion of the construction activities. C. Maintain copies of a schedule of major construction activities, inspection reports, and revision documentation with the SWPPP. 1.06 STORMWATER POLLUTION CONTROL A. Comply with the current requirements of TPDES General Permit No. TXR150000 as set forth by the TCEQ for the duration of the Project: 1. Develop a SWPPP meeting all requirements of the TPDES General Permit. 2. Submit of a Notice of Intent to the TCEQ. 3. Develop and implement appropriate Best Management Practices as established by local agencies of jurisdiction. 4. Provide all monitoring and/or sampling required for reporting to the TCEQ. 5. Submit reports to the TCEQ as required as a condition of the TPDES General Permit. 6. Submit copies of the reports to the Designer as Record Data in accordance with SECTION 01 33 03 RECORD DATA. 7. Retain copies of these documents at the Site at all times for review and inspection by the OPT or regulatory agencies. Post a copy of the permit as required by Laws and Regulations. 8. Assume sole responsibility for implementing, updating, and modifying the TPDES General Permit per Laws and Regulations for the SWPPP and Best Management Practices. B. Use forms required by the TCEQ to file the Notice of Intent. Submit the Notice of Intent at least 2 days prior to the start of construction. Develop the SWPPP prior to submitting the Notice of Intent. Provide draft copies of the Notice of Intent, SWPPP, and any other pertinent TCEQ submittal documents to Owner for review prior to submittal to the TCEQ. C. Return any property disturbed by construction activities to either specified conditions or pre -construction conditions as set forth in the Contract Documents. Provide an overall erosion and sedimentation control system that will protect all undisturbed areas and soil Temporary Controls 01 57 00 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 stockpiles/spoil areas. Implement appropriate Best Management Practices and techniques to control erosion and sedimentation and maintain these practices and techniques in effective operating condition during construction. Permanently stabilize exposed soil and fill as soon as practical during the Work. D. Assume sole responsibility for the means, methods, techniques, sequences, and procedures for furnishing, installing, and maintaining erosion and sedimentation control structures and procedures and overall compliance with the TPDES General Permit. Modify the system as required to effectively control erosion and sediment. E. Retain copies of reports required by the TPDES General Permit for 3 years from date of Final Completion. 1.07 POLLUTION CONTROL A. Prevent the contamination of soil, water, or atmosphere by the discharge of noxious substances from construction operations. Provide adequate measures to prevent the creation of noxious air -borne pollutants. Prevent dispersal of pollutants into the atmosphere. Do not dump or otherwise discharge noxious or harmful fluids into drains or sewers, nor allow noxious liquids to contaminate public waterways in any manner. B. Provide equipment and personnel and perform emergency measures necessary to contain any spillage. 1. Contain chemicals in protective areas and do not dump on soil. Dispose of such materials at off-site locations in an acceptable manner. 2. Excavate contaminated soil and dispose at an off-site location if contamination of the soil does occur. Fill resulting excavations with suitable backfill and compact to the density of the surrounding undisturbed soil. 3. Provide documentation to the Owner which states the nature and strength of the contaminant, method of disposal, and the location of the disposal site. 4. Comply with Laws and Regulations regarding the disposal of pollutants. C. Groundwater or run-off water which has come into contact with noxious chemicals, sludge, or sludge -contaminated soil is considered contaminated. Contaminated water must not be allowed to enter streams or water courses, leave the Site in a non -contained form, or enter non -contaminated areas of the Site. 1. Pump contaminated water to holding ponds constructed by the Contractor for this purpose, or discharge to areas on the interior of the Site, as designated by the OAR. 2. Construct temporary earthen dikes or take other precautions and measures as required to contain the contaminated water and pump to a designated storage area. 3. Wash any equipment used for handling contaminated water or soil within contaminated areas three times with uncontaminated water prior to using such equipment in an uncontaminated area. Dispose of wash water used to wash such equipment as contaminated water. Temporary Controls 01 57 00 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 1.08 EARTH CONTROL A. Remove excess soil, spoil materials, and other earth not required for backfill at the time of generation. Control stockpiled materials to eliminate interference with Contractor and Owner's operations. B. Dispose of excess earth off the Site. Provide written approval from the property owner for soils deposited on private property. Obtain approval of the Owner if this disposal impacts the use of Site or other easements. 1.09 MANAGEMENT OF WATER A. Manage water resulting from rains or ground water at the Site. Maintain trenches and excavations free of water at all times. B. Lower the water table in the construction area by acceptable means if necessary to maintain a dry and workable condition at al[ times. Provide drains, sumps, casings, well points, and other water control devices as necessary to remove excess water. C. Provide continuous operation of water management actions. Maintain standby equipment to provide proper and continuous operation for water management. D. Ensure that water drainage does not damage adjacent property. Divert water into the same natural watercourse in which its headwaters are located, or other natural stream or waterway as approved by the Owner. Assume responsibility for the discharge of water from the Site. E. Remove the temporary construction and restore the Site in a manner acceptable to the OAR and to match surrounding material at the conclusion of the Work. 1.10 DEWATERING A. This item is considered subsidiary for all dewatering methods other than "well p inting" to the appr priate bid items as described in the Bid Form where dewatering is needed to keep the excavation dry, as approved by the Designer, and shall include all c sts to provide a dry foundation for the proposed improvements. B. Storm water that enters an excavation can be pumped out as long as care is taken to minimize solids and mud entering the pump suction and flow is pumped to a location that allows for sheet flow prior to entering a storm water drainage ditch or storm water inlet. C. An alternative t sheet flow is to pump storm water to an area where ponding occur& naturally without leaving the designated work area or by a manmade berm(s) prior to entering the storm water system. Sheet flow and ponding is to allow solids screening and/or settling prior to entering a storm water conduit or inlet. D. Storm water or groundwatcr shall not be discharged to private property without permission. It is thc intcnt that Contractor discharges groundwater primarily into thc existing storm water system, provided that thc quality of groundwater is equal to or better than the receiving stream, thc Nucccs Rivcr. E. Testing of groundwater quality is to be performed by the Owner, at the Owner's expense, prior to commencing discharge and shall be retested by the Owner, at the Owner'& Temporary Controls 01 57 00 - 4 Q.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 ixpens , a minimum of one a w k. Contractor shall coordinate with the Owner on all testing. Tests will also be perf rmed as each new area of construction is started. nearest sanitary sewer system. If discharging to temporary holding tanks and trucking to a sanitary sewer or wastewater plant, the costs for these operations shall be negotiated. Other groundwater disposal alternatives or solutions may be approved by the Designer on a case by case basis. G. Prior to Pumping groundwater from a trench to the sanitary sewer system the Contractor a "no cost" permit from the Owner's Waste Water Department. Owner will pay for any water quality testing or water analysis cost required. The permit will require an estimate of groundwater flow. Groundwater flow can be estimated by boring a hole or excavating a short trench then record water level shortly after completion, allow to sit overnight, record water level again, pump hole or trench dry to a holding tank or vacuum truck then record how long it takes to fill to original level and overnight level. 1.11 DISPOSAL OF CONTAMINATED GROUNDWATER A. An allowance will be included in thc Rid for the unanticipated disposal of contaminated groundwater. This allowance may not be needed but is provided in case contaminated groundwater is encountered during thc course of thc Project and docs not meet the water quality requirements for discharge into thc storm water or wastewater systems. allowance includes all materials, tools, equipment, labor, transportation, hauling, coordination, and proper disposal of the contaminated water at an approved landfill, deep water injection well, or other site as agreed to by the Designer. Suggested disposal facilities would be [US Ecology (USET) in Robstown, Texas. B. The payment for this Work will be based on the Contractor's actual costs and will be negotiated. Payment will not include costs associated with dewatering which is paid for under g+d'Item -1242,—, oar 471. 1.12 DISPOSAL OF HIGHLY CHLORINATED WATER A. Dispose of water used for testing, disinfection, and line flushing. Comply with Owner's requirements and Laws and Regulation regarding the disposal of contaminated water, including water with levels of chlorine, which exceed the permissible limits for discharge into wetlands or environmentally sensitive areas. Comply with the requirements of all regulatory agencies in the disposal of all water used in the Project. Include a description and details for disposal of this water in a Plan of Action per SECTION 01 35 00 SPECIAL PROCEDURES. Do not use the Owner's sanitary sewer system for disposal of contaminated water. 1.13 WINDSTORM CERTIFICATION A. All affected materials and installation shall comply with Texas Department of Insurance Requirements for windstorm resistant construction for design wind speed as required by IBC 2009. Owner shall be responsible for contracting with a licensed structural engineer in the State of Texas to perform all inspections and provide documentation for windstorm certification to the Texas Board of Insurance. The Contractor shall be responsible for Temporary Controls 01 57 00 - 5 Q.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 providing all necessary design/assembly documentation for all new windows, doors, louvers, etc. to the windstorm engineer/inspectors required to conform with the requirements of the Texas Department of Insurance. 2.00 PRODUCTS 2.01 MATERIALS A. Provide materials that comply with Laws and Regulations. 3.00 EXECUTION 3.01 CONSTRUCTING, MAINTAINING AND REMOVING TEMPORARY CONTROLS A. Construct temporary controls in accordance with Laws and Regulations. B. Maintain controls in accordance with regulatory requirements where applicable, or in accordance with the requirements of the Contract Documents. C. Remove temporary controls when no longer required, but before the Project is complete. Correct any damage or pollution that occurs as the result of removing controls while they are still required. END OF SECTION Temporary Controls 01 57 00 - 6 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS 1.00 GENERAL 1.01 WORK INCLUDED A. Comply with requirements of the General Conditions and specified administrative procedures in closing out the Contract. 1.02 DOCUMENT SUBMITTAL A. Submit certifications and releases on forms provided. 1.03 SUBSTANTIAL COMPLETION A. Notify the Designer that the Work or a designated portion of the Work is substantially complete per the General Conditions. Include a list of the items remaining to be completed or corrected before the Project will be considered to be complete. B. OPT will visit the Site to observe the Work within a reasonable time after notification is received to determine the status of the Project. C. Designer will notify the Contractor that the Work is either substantially complete or that additional Work must be performed before the Project will be considered substantially complete. 1. Designer will notify the Contractor of items that must be completed before the Project will be considered substantially complete. 2. Correct the noted deficiencies in the Work. 3. Notify the Designer when the items of Work in the Designer's notice have been completed. 4. OPT will revisit the Site and repeat the process. 5. Designer will issue a Certificate of Substantial Completion to the Contractor when the OPT considers the Project to be substantially complete. The Certificate will include a tentative list of items to be corrected before Final Payment will be recommended. 6. Review the list and notify the Designer of any objections to items on the list within 10 days after receiving the Certificate of Substantial Completion. 1.04 FINAL INSPECTION A. Notify the Designer when: 1. Work has been completed in compliance with the Contract Documents; 2. Equipment and systems have been tested per Contract Documents and are fully operational; 3. Final Operations and Maintenance Manuals have been provided to the Owner and all operator training has been completed; 4. Specified spare parts and special tools have been provided; and Execution and Closeout Requirements 01 70 00 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 5. Work is complete and ready for final inspection. B. OPT will visit the Site to determine if the Project is complete and ready for Final Payment within a reasonable time after the notice is received. C. Designer will notify the Contractor that the Project is complete or will notify the Contractor that Work is Defective. D. Take immediate steps to correct Defective Work. Notify the Designer when Defective Work has corrected. OPT will visit the Site to determine if the Project is complete and the Work is acceptable. Designer will notify the Contractor that the Project is complete or will notify the Contractor that Work is Defective. E. Submit the Request for Final Payment with the closeout documents described in Paragraph 1.06 if notified that the Project is complete and the Work is acceptable. 1.05 REINSPECTION FEES A. Owner may impose a Set-off against the Application for Payment in accordance with the General Conditions to compensate the OPT for additional visits to the Project if additional Work is required. 1.06 CLOSEOUT DOCUMENTS SUBMITTAL A. Record Documents per SECTION 0131 13 PROJECT COORDINATION. B. Warranties and bonds. C. Equipment installation reports on equipment. D. Shop Drawings, Record Data, and other documents as required by the Contract Documents. E. Evidence of continuing insurance and bond coverage as required by the Contract Documents. F. Final Photographs per SECTION 0133 05 VIDEO AND PHOTOGRAPHIC DOCUMENTATION. 1.07 TRANSFER OF UTILITIES A. Transfer utilities to the Owner when the Certificate of Substantial Completion has been issued and the Work has been occupied by the Owner. B. Submit final meter readings for utilities and similar data as of the date the Owner occupied the Work. 1.08 WARRANTIES, BONDS, AND SERVICES AGREEMENTS A. Provide warranties, bonds, and service agreements required by SECTION 0133 02 SHOP DRAWINGS or by the individual Specification Sections. B. The date for the start of warranties, bonds, and service agreements is established per the General Conditions. C. Compile warranties, bonds, and service agreements and review these documents for compliance with the Contract Documents. Execution and Closeout Requirements 01 70 00 - 2 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 1. Provide a log of all equipment covered under the 1 year correction period specified in the General Conditions and all products for which special or extended warranties or guarantees are provided. Index the log by Specification Section number on forms provided. Include items 2.e through 2.g below in the tabulation. 2. Provide a copy of specific warranties or guarantees under a tab indexed to the log. Each document is to include: a. A description of the product or Work item; b. The firm name, with the name of the principal, address, and telephone number; c. Signature of the respective Supplier or Subcontractor to acknowledge existence of the warranty obligation for extended warranties and service agreements; d. Scope of warranty, bond, or services agreement; e. Indicate the start date for the correction period specified in the General Conditions for each product and the date on which the specified correction period expires. f. Indicate the start date for extended warranties for each product and the date on which the specified extended warranties period expires. g. Start date, warranty or guarantee period, and expiration date for each warranty bond and service agreement; h. Procedures to be followed in the event of a failure; and i. Specific instances that might invalidate the warranty or bond. D. Submit digital copies of the documents to the Designer for review. E. Submit warranties, bonds and services agreements within 10 days after equipment or components placed in service. 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Execution and Closeout Requirements 01 70 00 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 Technical Specifications SECTION 46 76 11 DREDGING, DEWATERING AND HAULING PART 1GENERAL 1.01 DESCRIPTION This specification shall govern the furnishing of all labor, material, equipment, and all work to remove residuals material from Lagoon No. 7, dewater the material as necessary, and haul the material to the landfill, as specified on the drawings. All residuals handling, transporting, and disposal shall comply with TCEQ chapters 315 and 305. All temporary or permanent improvements made to the plant site for the purpose of this contract shall be in compliance with all applicable Federal, State, and local regulations. The Contractor shall provide the appropriate documentation of compliance upon request from the City or Engineer. The initial base contract will be for a one (1) year (12 -calendar months) and approximately $4M with one (1) optional one (1) year (12 -calendar months) renewal for an additional $4M based on Contractor's successful performance, approval by the City/Engineer and concurrence from the Contractor. The total estimated quantity of residuals to be removed during the base contract is 10,000 dry tons (DT). 1.02 SUBMITTALS A. Minimum requirements for projects to be considered equal to or greater are as follows: 1. Five (5) projects in the past five (5) years in which the Contractor dewatered and hauled and/or dredged 30 dry tons (DT) per day or 10,000 DT per year of water treatment plant residuals. 2. At least three (3) of the five (5) projects meeting the requirements in 1 above must have consisted of aluminum sulfate (Alum) residuals. B. Include the following, per Section 00 45 16 STATEMENT OF EXPERIENCE §§5.01., with the Bid. All documents listed below should be submitted in a format in accordance with Article 4 of the STATEMENT OF EXPERIENCE. 11x17 sheets should be used for the Site Exhibit and Proposed Schedule 1. Site Exhibit The Site Exhibit should convey as much information about the strategy to complete the Scope of Work as graphically possible. The Work Plan Narrative and Site Exhibit are complimentary to each other and information shown in one does not need to be repeated in the other but discrepancies between the two should be avoided. 2. Work Plan Narrative The Work Plan Narrative should describe the methods, equipment, materials, personnel and schedule proposed by the Contractor to achieve the Project's Scope of Work. The purpose of the Work Plan Narrative is to add operational and process detail to the Site Exhibit that cannot be conveyed graphically. The Work Plan Narrative should be limited to no more four (4) pages. 3. The following information should be included in either the Site Exhibit or the Work Plan Narrative: ONSWTP Intermediate Sludge Removal Phase I 46 76 11-1 a. Mobilization and Placement of Dredging, Dewatering, and Hauling Equipment including: 1) Types, capacity, and quantity of dredges 2) Method for removing aquatic vegetation (cattails). 3) Plan for deployment of dredge into pond (crane required)? 4) Mobilization schedule 5) Proposed site footprint 6) Proposed method, equipment, and duration for removing cattails b. Dredging Operation Plan 1) Provisions for protecting Liner 2) Anticipated dredge rate and working hours 3) Redundancy or provisions for equipment failure 4) General pattern of progression of residual removal inside Lagoon #7 c. Dewatering Operation 1) Types, capacity, and quantity of dewatering equipment 2) Deployment and footprint of dewatering equipment 3) Configuration of dewatering equipment, piping, tanks, etc. 4) Footprint of polymer feed equipment 5) Flow control/buffer between dredge and dewatering equipment including type, capacity, and quantity of attenuation basins/tanks (if required). 6) Configuration of dewatering equipment discharge (i.e. pipes, conveyors, cake receiving containers, cake stockpile area, etc.) 7) Containment details for dewatering and stockpile area. 8) Configuration of filtrate return equipment including attenuation tanks, pumps, hose routing, discharge location, etc. (as applicable). d. Hauling Operation 1) Capacity, quantity, and type of truck. 2) Capacity, quantity and staging footprint of roll -off containers or other hauling containers, trailers or trucks. 3) Proposed site ingress and egress. Ingress and egress from Hearn Road is available. Describe improvements to access points or staging area, if needed (subsidiary to unit price per dry ton). 4) Proposed load sampling location 5) Proposed route to and from final disposal site (Cefe Valenzuela Landfill or other). ONSWTP Intermediate Sludge Removal Phase I 46 76 11-2 6) Estimate of anticipated total number of loads required and number of loads per day. e. Any unique or significant equipment, processes, or procedures that are not listed above. THE SUBMITTALS DESCRIBED IN THE REMAINDER OF SECTION 1.02 ARE CONSTRUCTION SUBMITTALS AND ARE NOT DUE TO BE SUBMITTED WITH THE BID. CONSTRUCTION SUBMITTALS ARE DUE AFTER CONTRACT AWARD AND BEFORE EXECUTION OR IMPLEMENTATION OF ANY OF THE WORK ASSOCIATED WITH EACH RESPECTIVE SUBMITTAL. C. Dredge Equipment: Contractor shall provide specific information on equipment to be used to perform dredging. Include equipment manufacturer, model number, type of dredge head, positioning system, and performance characteristics. Also include recent photographs of equipment. The dredge equipment submittal shall be delivered to the Engineer for review no later than fourteen (14) calendar days after the issuance of the Notice of Award Letter. Engineer shall notify contractors of equipment approval in accordance with the General Conditions. The City reserves the right to disallow, at any time, the operation or use of any equipment component that it deems inadequate to perform the work within the specified contract time, or that could potentially compromise the public water supply in any way, or that does not meet the noise ordinance criteria stipulated in 3.05 .F. D. Pre Dredge Survey/Statement of Concurrence: Prior to commencing dredging operation, verify that the residuals deposit grades within thc lagoons arc consistent with the data shown on the drawings. Provide either a new Pre dredge Survey performed and sealed by a Registered Profen ional Land Surveyor (R.P.L.S.) in thc State of Tcxas, or a Statement of Concurrence with the data shown on the drawings. Refer to paragraph '1.01, A. E. Dewatering Equipment: Contractor shall provide specific information on equipment to be used to perform dewatering. Include equipment manufacturer, model number, and performance characteristics. Also include recent photographs of equipment. F. Polymer: Contractor shall provide specific information on polymer to be used. Include manufacturer, trade name, MSDS, and proof of NSF certification. G. Polymer Feed Station: Contractor shall provide specific information on equipment to be used in the polymer feed station. Include list of major components (tanks, metering pumps, mixers with manufacturer, model number, and performance characteristics. Also include recent photographs of equipment. H. Trucks and Containers: Contractor shall provide specific information on equipment to be used for hauling. Include equipment manufacturer, model number, gross vehicle weight rating (GVWR), and current registrations, inspections, and certifications. Include recent photographs of equipment. Also include the Unique Truck/Container ID key in accordance with section 3.08C.1.I. I. Turbidity Curtain: Contractor shall submit product information for the proposed turbidity curtain meeting the requirements of section 3.07. C. J. Percent Solids Sampling Plan: Contractor shall submit a percent solids sampling plan describing method of obtaining representative samples for each load, making daily composite sample, preserving sample(s) for testing and schedule of delivery of samples and receipt of laboratory testing results. ONSWTP Intermediate Sludge Removal Phase I 46 76 11-3 K. Testing Laboratory: Contractor shall submit the name, physical address, and contact information of their proposed testing laboratory, for approval. If separate labs are proposed to be used for the percent solids testing and TCLP/TPH testing Contractor shall submit the required information for both laboratories. L. Pipeline Map: Prior to commencing dredging operation, provide a site map showing all pipelines, including pipeline routing and crossings, and location of dredge/residual discharge point. Contractor to provide piping protection at all road crossings. Include any existing utilities and protection. M. Notification: The Contractor shall notify the City Water Department or Plant Staff in writing, at least ten (10) days prior to setup of any dredge equipment directly in the lagoons, or to request water level adjustments in the lagoons. N. Daily Activity Reports: During the dredging operation, provide a daily record of activities occurring at the lagoon(s), and disposal site. Submit daily reports to the Engineer on a weekly basis. Refer to paragraph 3.09.A. O. Spill Contingency Plan: Prior to commencing dredging operation, provide a Spill Contingency Plan. Refer to paragraph 3.08.B. P. Monthly Operations Report: Upon submittal of the monthly invoice the Contractor shall submit a Monthly Operations Report that shall be in accordance with section 3.09.B: 1.03 QUALITY ASSURANCE A. Permits: The Contractor shall comply with all conditions and requirements of Federal, State, and local regulations and specifically with TCEQ Chapters 312 and 305. There shall be no discharge of dredged material or water from City property or outside of the drainage area of the lagoon. B. Environmental Protection Requirements: Provide and maintain environmental protection measures during the entire construction period. Comply with all Federal, State, and local regulations pertaining to water, air, and noise pollution. C. Public Water Supply Protection Requirements: Protection of the public water supply is essential. Prevent fuels, hydraulic fluid, lubricating oils, and any other contaminants from entering the lagoons. Provision to protect the public water supply should be prominent in the Spill Contingency Plan provided by the Contractor. PART 2PRODUCTS 2.01 DREDGE/RESIDUALS MATERIAL A. Lagoon Material: Any and all material (unclassified) that currently exists within the lagoons. B. Objectionable Material: Material such as rocks, cable, trees, tires, concrete, debris, etc. shall not be deposited or temporarily stored anywhere within the site. This material shall become property of the Contractor and be removed from the project site and disposed of in accordance with all applicable laws and ordinances. C. Aquatic Vegetation: Any aquatic vegetation existing near the surface of the lagoon and specifically cattails. ONSWTP Intermediate Sludge Removal Phase I 46 76 11-4 PART 3EXECUTION 3.01 LAGOON PREPARATION A. Verification of Conditions: Prior to setup of dredge equipment within the lagoons, verify that existing conditions are consistent with the drawings. Immediately notify the Engineer should there be any discrepancies. B. Removal of Aquatic Vegetation: Removal of all aquatic vegetation (cattails, etc.) will be required. All aquatic vegetation shall be removed to facilitate dredging and in a way that prevents damage to the embankment of the lagoon(s). The aquatic vegetation removed from the lagoon may be disposed of at the Pollywog Ponds disposal site. Method of vegetation removal is to be determined by the Contractor and submitted to the Engineer for approval. 3.02 DREDGE EQUIPMENT/SETUP A. Dredge Equipment: Equipment utilized to remove residuals material from the lagoons shall have the following minimum features and characteristics: 1. Dredge positioning system (cable drive or self -propulsion) without spuds. 2. Skids or other protection device at dredgehead to prevent damage to clay liner and slopes of lagoons. 3. Electric or hydraulically powered. All hydraulic fluid shall be biodegradable. No combustion engines shall be permitted within the lagoons unless specifically equipped with satisfactory spill containment to ensure that fuel does not leak into the public water supply. B. Emergency Spill Response Equipment: Prior to commencing dredging operation, sufficient spill response equipment, i.e. boom, etc. shall be on-site and ready for deployment in the event of an emergency or accident. C. Water Level Adjustments: At the Contractor's request and at the City's discretion, the water level in the lagoons may be adjusted to support the dredging operation. The City has limited ability to add or remove water at the lagoons therefore arrangements must be made 72 -hours in advance of the starting of removal/dredging operations if adjustments are required. The City and plant operators have full discretion as to whether the water level adjustments can be facilitated or not. D. Setup: The dredge, pipelines, and associated equipment shall be of a size sufficient to perform the work and shall be kept in condition for efficient production. E. Turbidity Curtain: A turbidity curtain shall be installed by the contractor around the lagoon pump intake to prevent turbid water from entering the decant water pumping system. 3.03 DREDGING OPERATION A. General: Dredging shall be performed by mechanical or hydraulic methods or other method authorized by the Engineer. B. Dredge Cut Tolerance: Plus or minus 0.50 feet. C. Protection of Existing Embankment and Lagoon Appurtenances: Use care in prosecuting the work to assure the side slopes of embankments, clay liner, bottom, and other structures within the lagoons are not jeopardized by dredging. Repair any damage resulting from the dredging operation to the satisfaction of the City and at the expense of the Contractor. ONSWTP Intermediate Sludge Removal Phase I 46 76 11-5 3.04 DREDGE/RESIDUALS DISCHARGE A. General: Dredge/residuals material shall be pumped or otherwise conveyed to the stagingldewatering area identified by the Contractor. Material shall not be deposited or allowed to flow into any stream tributary, existing drainage outlet ditch, canal, water intake, or outlet facility; nor shall materials be allowed to flow onto any improved areas in or adjacent to the disposal site. The Contractor shall promptly remove any spilled material and shall place it in the disposal site. B. Pipelines: The use of pontooned or submerged sections of the dredge pipeline shall not interfere with the normal operation of the lagoon(s). C. Unauthorized Disposal of Material: Dredged/residuals material may not be deposited anywhere on site other than being temporarily held and contained in a designated stockpile area or tank. During the progress of the work, the Contractor shall not deposit worn out discharge pipe, wire, rope, scrap metal, timbers, or any other such type of rubbish or obstructive material on site. Such material, together with any scrap, rope, wire cable, piles, pipe, or any other obstructive material which may be encountered during the dredging operations, shall be properly disposed of by the Contractor in accordance with state and federal regulations. 3.05 RESIDUALS DEWATERING A. Dewatering of residuals is required, as necessary to pass the paint filter test, before hauling to a permitted municipal solid waste landfill. B. Contractor will be responsible to select the means of dewatering and submit the proposed equipment to the Engineer for approval. C. The use of a NSF approved polymer is allowed as necessary to facilitate dewatering. D. Other than polymer, addition of any other material that would change the chemical or physical properties of the dewatered residuals is prohibited unless otherwise approved by the Engineer. E. Any dewatering operation and equipment shall be sufficiently contained to prevent a spill or discharge of wet or dewatered material into any stream tributary, existing drainage outlet ditch, canal, water intake, or outlet facility; or any improved areas in or adjacent to the site. The Contractor shall promptly remove any spilled material and return it to the removal process for ultimate disposal at the disposal site. F. Dredging and dewatering operations shall be permitted to occur 24 hours per day and 7 days per week with no exceptions given that the equipment and operations comply with the Code of Ordinances. City of Corpus Christi. Texas. Part III. Chapter 31 [Ord. No. 027440, § 1, 10-9-2047]. A portion of the applicable ordinance is provided below for reference. "It shall be unlawful for any person to conduct, permit, allow, or produce a sound that is discernable beyond the property lines of the property on which the sound is being produced that, when measured with a sound level meter using the standardized frequency weighting as specified by the American National Standards Institute, exceeds the applicable dB(A) level listed below for the property on which the sound is received: (1) Seventy (70) dB(A) between the hours of 8:01 a.m. and 11:00 p.m. Sunday through Thursday and between the hours of 7:01 a.m. and 12:00 midnight on Friday and Saturday. (2) Sixty (60) dB(A) between the hours of 11:01 p.m. and 8:00 a.m. Sunday through Thursday and between the hours of 12:01 a.m. and 7:00 a.m. on Friday and Saturday and between the hours of 12:01 a.m. and 8:00 a.m. on Sunday. ONSWTP Intermediate Sludge Removal Phase I 46 76 11-6 (3) Eighty-five (85) dB(A) for sound that both originates from and is received on property within the Entertainment District, at all times." G. If the dredging or dewater equipment does not comply with the City's noise ordinance as referenced herein, the dredging and dewatering operation will be limited to normal plant business hours (between the hours of 7 a.m. and 6:00 p.m. Monday through Friday). 3.06 HAULING A. Regulatory Compliance: All vehicles and hauling containers must comply with Federal, State, and local regulatory requirements. Specifically, TCEQ chapters 312 and 305 shall be complied with at all times, as applicable. B. All hauling vehicles shall comply with the weight limits established by the Texas Department of Motor Vehicles for each vehicles respective axle combination. C. Trip Tickets complying with TCEQ Chapter 312 shall be submitted to the Engineer for each load hauled from the project site. Trip Tickets shall be submitted on a weekly basis. An example Trip Ticket is provided herein as Attachment A for Contractor's reference and use. Trip Tickets must be retained for a period of five (5) years and be made available to TCEQ upon request. D. All Haulers and their vehicles must be registered with the City of Corpus Christi. All requirements and necessary forms and fees are detailed in Attachment B to this specification. No tipping fee will be imposed on any Hauler in association with the work of this contract. Hauler and Vehicle registration fees specified in Attachment B are applicable and required. E. Hauling operations shall be limited to arriving at Cefe Valenzuela landfill between the hours of 7:00 a.m. and 5:00 p.m. Monday through Friday and between 11:00 a.m. and 5:00 p.m. on Saturday. No hauling will be permitted on Sunday. F. Upon departure from the project site, each truck must be sampled for percent solids and paint filter test by the Contractor in accordance with section 3.08.C. Paint filter test at the project site will be conducted by the Contractor for the Contractors reference and to ensure the load will be accepted at the landfill. G. Upon arrival at the disposal site, each truck will be sampled for paint filter test by landfill staff. This will be the official paint filter test and will determine whether the load is acceptable to the landfill or not. H. The Contractor will use the scales provided at the landfill for Gross Weight and Tare Weight measurements. The loads net weight will be calculated as Gross Weight minus Tare Weight. I. Upon the landfills acceptance of the load based on the paint filter test, the landfill will provide direction as to the area for the load to be deposited. J. Contractor shall be responsible to prevent spillage and tracking and will be responsible for remediating, cleaning and restoring any areas on which spillage or tracking occurs. K. Contractor shall be responsible for any site improvements required to accommodate the hauling operation such as entrances, driveways, etc. Contractor shall also be responsible to maintain site access surfaces in a condition acceptable to their hauling operation. All access improvements or maintenance are considered subsidiary to the unit cost per dry ton. ONSWTP Intermediate Sludge Removal Phase I 46 76 11-7 3.07 SITE MANAGEMENT A. Monitoring: The Contractor shall have constant monitoring of the pipelines and designated dewatering site during dredging operations. The personnel monitoring shall be in radio contact with the dredge at all times. The Contractor shall expand radio contact to include a designated City representative for emergency response purposes. B. Lagoon Embankments/Levees: The Contractor shall prevent damage to any existing embankment/levee. Any damage shall be repaired at the Contractor's expense. C. Washwater Return Pump Station Protection/Turbidity Curtain: Contractor shall provide a turbidity curtain or other form of protection from turbidity and sedimentation as approved by the Engineer, for the Washwater Return Pump Station and as indicated on the plans. 1. Lines, tie -downs and anchors shall be installed per manufacturer's recommendations. Generally, a Type II permeable turbidity curtain (for currents up to 1 knot or 1.69 feet per second) is sufficient for this application. Turbidity curtains that have been previously used in other water bodies must be properly cleaned to prevent the spread of invasive exotic species from other sites. If any materials (including turbidity curtains, bouys and chains) have been previously used, they shall be disinfected with vinegar or cleaned with hot water greater than 104 deg. F then allowed to completely dry for a minimum period of five days. If there are any questions about the occurrence of zebra mussels (Dreissena polymorpha), Giant salvinia (Salvinia molests), or other aquatic invasive species in a waterbody that you have worked in, are working in, or intend to work in, contact the Texas Parks and Wildlife Department. The remainder of section 3.07.0 is adapted from TxDOT Special Specification 5538 (2004). 2. Materials: The floating turbidity barrier supplied shall be a standard manufactured product. All materials shall be corrosion resistant. Materials at the water surface shall not degenerate when exposed to sunlight, oils, and petroleum products. The manufacturer shall supply a certification that the product supplied meets the requirements of this specification. The floating turbidity barrier consists of a PVC coated nylon section and a geosynthetic barrier/curtain section, load line, mooring lines, adjustment lines and tie -downs, floatation, ballast, anchors, mooring buoys, and lighted buoy. a. Turbidity Barrier/Curtain: The Turbidity Barrier/curtain geosynthetics shall have the following properties: • The top section shall consist of an 18-22 oz. per square yard PVC coated nylon fabric. It shall be a bright yellow or orange color to be easily seen. • The curtain material shall consist of a tightly woven monofilament yarn filter fabric as specified below: Property ASTM Test Method Value Weight ASTM D-4632 6.2 oz/sq. yd Tensile Strength ASTM D-4632 390 x 280 lbs ONSWTP Intermediate Sludge Removal Phase I 46 76 11-8 Trapezoidal Tear Strength ASTM D-4533 100 x 60 lbs Burst Strength ASTM D-3786 530 psi Puncture Strength ASTM D-3787 140 lbs Elongation ASTM D-4632 25 % UV Resistance ASTM D-4355 90 % Retained E.D.S. *CW -02215 70 US Standard Sieve *US Army Corps of Engineers Civil Works Construction Guide Specification CW -02215, "Plastic Filter Fabric.' • Be a woven material such that the equivalent opening size, E.O.S., cannot be enlarged under pressure or by being snagged. b. Floatation: Turbidity barrier/curtain floatation material shall be a closed cell solid foam material which has sufficient buoyancy to provide the curtain with continuous support, and a minimum of 6 inches freeboard. The sections of floatation shall be installed such that they cannot move along inside the sleeve and the space between sections shall not be more than twice the thickness of the floatation material. c. Load Lines: Load lines shall be minimum 1/4 in to 5/16 in. vinyl coated galvanized aircraft cable with 9800 Ib. breaking strength. The load line shall have galvanized connectors with tool free disconnect. d. Mooring Lines: Adjustment lines shall be minimum 1/2 in. nylon rope. e. Adjustment Line Tie -Downs: Adjustment lines and tie down lines shall be minimum 1/2 in. nylon rope. f. Ballast: Ballast shall be minimum 1/4 in to 5/16 in. galvanized steel chain. g. Anchors: Turbidity barrier/curtain anchors shall have a sufficient mass and spaced to secure the barrier as recommended by the manufacturer depending on the current velocities. Expected current velocity is less than 0.5 feet per second. h. Mooring Buoys: Mooring buoys shall have provisions for the mooring line to be securely attached and be sufficiently buoyant to remain afloat under normal load conditions. along tho outer navigable channel 3. Construction: Construction methods, workmanship, equipment and materials used hall conform to the various items of the standard specifications which govern the items of work to be performed under this contract and as specified on the plans. Place the barrier prior to commencement of any work that could impact the area of concern. Ensure that the type of barrier used and the deployment and maintenance of the barrier will minimize dispersion of turbid water from the excavation and dredging area. Operate the turbidity barrier in such a manner to avoid or minimize the degradation of the water quality of surrounding waters. ONSWTP Intermediate Sludge Removal Phase I 46 76 11-9 The barrier shall have sufficient ballast to anchor the barrier along the channel bottom. The Contractor will immediately repair or replace defective or damaged portions of the turbidity curtain. The turbidity curtain will remain in place until such time that water contained within is free from turbidity. The curtain shall be removed within 72 hours after this determination has been made. If required, the area behind the turbidity curtain will be cleaned prior to removal. D. Spill control, SWPPP, and storm water permits and regulations are to be complied with by Contractor and costs are subsidiary to the unit price per dry ton. 3.08 QUALITY CONTROL A. General: The Contractor shall establish and maintain a quality control system for dredging operations to assure compliance with the contract requirements and record the inspections and tests under this system, including but not limited, discharge effluent and spillage from the dredging equipment into the lagoons. B. Spill Contingency Plan: The Contractor shall provide and maintain an effective dredge spill contingency plan that includes the following as a minimum. 1. The Contractor shall identify and have available the names and phone numbers of companies having portable hydraulic dredges or vacuum pumps ready to clean up any dredge/residuals material discharged from the site. 2. The Contractor's Dredge Spill Contingency Plan shall include the following procedures to be followed in the event of an emergency or accident: a. The dredge shall cease operations immediately. b. The Contractor shall immediately notify the City, Water Division, or the designated City representative via radio contact or cell phone. c. Contractor shall submit a specific clean-up plan to the City for approval. No clean-up actions will commence until the plan has been approved. All clean- up of misplaced or spilled material shall be at the Contractor's expense. C. Dewatered Residuals Samplina and Testina: Contractor shall sample and test the residuals removed from the lagoons and hauled to the disposal site according to the schedule below. Description Sampling Frequency Test Method Testing Frequency Percent Solids Every Load Standard Method 2540G (or EPA Method 1684 or 0160.3 if 2540G is not available from lab). Daily Composite Paint Test Filter Every Load EPA Method 90956 Every Load (once Contractor and once landfill by by TCLP Every 25,000 CY EPA Method 1311 Every 25,000 CY TPH Every 25,000 CY TCEQ Method 1005 Every 25,000 CY ONSWTP Intermediate Sludge Removal Phase I 46 76 11-10 Percent Solids: CONTRACTOR shall make a daily composite sample of residuals transported from the facility which is comprised of individual representative samples taken from each truck leaving the site on a given day. Percent solids test results shall be reported to the Engineer daily. a. The sample(s) shall be stored throughout the day in airtight containers and in a manner that will preserve the integrity of the sample(s). b. The daily composite sample shall be tested by an independent laboratory, contracted by and paid for by the CONTRACTOR, to determine percent total solids (%TS) of the dewatered residuals. c. Percent total solids content shall be determined following established laboratory procedures as specified in Test 2540G of the most recent edition of "Standard Methods". If the selected laboratory does not perform Standard Method 2540G another method may be requested for Engineer's approval. d. The samples taken to make the composite sample shall be taken directly from the container used for hauling. e. No material is to be added to the container after the sample has been taken. f. The sample shall be taken from at least four (4) inches below the top surface of the residuals in the load and shall not be taken from within four (4) inches of any perimeter of the load (i.e. sides, bottom, top, front, or back of the container). All samples taken in a single day shall be of a uniform volume. All samples on any day shall be a minimum volume of 100 mL and no more than 250 mL, or as otherwise directed by the testing laboratory. h. Samples shall not be compressed into containers. Containers shall be overfilled and the lid secured to the overfilled container so as to shed any excess material in the process of securing the lid. Samples may be collected using a plastic or metal scoop, plastic or metal coring device, or other tool to facilitate proper sampling. Contractor may make the composite sample in one of the following ways: 1) Directly after each individual truck sample is taken, or 2) After the last load of the day has been accepted at the landfill, or 3) May have the lab make the composite sample. In all cases, the composite sample must contain equal volumes of each individual sample and be kept in an air tight container until the time of testing. k. All individual load samples will have a unique sample ID number as detailed below or an alternate unique numbering system as submitted to, and approved by, the Engineer. g. 1 - Sequential Sample Number Starting at 1 for the first load each day. Date (YYYYIMM/DD) Unique Truck/Container ID # XX- XXXX/XX/XX- XXXX ONSWTP Intermediate Sludge Removal Phase I 46 76 11-11 The Unique Truck/Container ID is determined by the Contractor for each hauling container. A key showing the Unique ID corresponding the TCEQ registration number shall be submitted to the Engineer for approval and reference. m. Each sample shall also be marked with the time that the sample was taken. n. Each daily composite sample will be labeled with the date corresponding to the date of all samples incorporated into the composite sample. o. The City and Engineer reserve the right to make a split sample of any percent solids samples taken by the Contractor and have them tested to validate results. In the event that the results vary by 5% Total Solids or more the average of the two results will be used for payment of that days load. If deviations of 5% or more occur repeatedly or frequently sampling and testing procedures will be reviewed and adjusted to eliminate the unnecessary introduction of error. 3.09 RECORD OF ACTIVITIES A. Daily Operations Report The Contractor will be required to prepare and maintain a daily summary report of all operations and furnish legible copies thereof to the Engineer. The daily summary report should include information including: 1. Total hours work was performed 2. Total number of each trade on site and approximate hours worked 3. Equipment on-site and in use 4. Weather (beginning temp, ending temp, rain recorded, general description) 5. Total number of loads removed from ONSWTP. 6. Trip Tickets for each load shall be submitted to the Engineer on a weekly basis. B. Monthly Operations Report Upon submittal of the monthly invoice the Contractor shall submit a Monthly Operations Report that shall The Contractor will be required to prepare and maintain a daily summary report of all operations and furnish legible copies thereof to the Engineer. The daily summary report should include information including: 1. All data required for federal, state and local reports, 2. Amount (cost and percentage of total invoice) of work applicable for MWBE goals, 3. Summary of costs including transportation, disposal, equipment maintenance, system operation 4. Total monthly polymer usage in applicable units as purchased from manufacturer. 5. Record of each load hauled for each day in the reporting period, including: a. Gross Weight b. Tare Weight ONSWTP Intermediate Sludge Removal Phase I 46 76 11-12 c. Net load weight d. Daily percent solids test results e. Total Dry Tons 6. Any operational issues encountered during the reporting period 7. Reports of analytical testing conducted during the reporting period (including percent solids, TCLP, and TPH) 8. All disposal Manifests and Trip Tickets meeting the requirements of TCEQ Chapter 312. 3.10 EQUIPMENT REMOVAL/DISPOSAL SITE CLOSURE A. General: Upon completion of the work, promptly remove equipment, including pipelines, buoys, and other markers or obstructions placed by or for the Contractor. PART 4MEASUREMENT AND PAYMENT 4.01 MEASUREMENT A. Pre Dredge Survey: Refer to the drawings for recent pre dredge survey of the North/South Lagoons. Should the Contractor take exception, he may perform his own survey at his own expense for consideration by thc Engineer. However. the Engineer shall be given thc opportunity to observe this survey work. and all work must be performed and sealed by a Registered Professional Land Surveyor in the State of Texas. B. 0 d pth: No quantity adjustment will be made for the dredge/residuals material removed within the specified tolerance range or overdepth outside this range. C. Measurement of water treatment residuals dredging, dewatering and hauling will be made based on the unit price bid of dry tons of solids removed. Dry tons of solids removed will be measured by multiplying the %TS of each days composite sample by the total weight of all loads delivered to the landfill for the corresponding day as reported on the TCEQ Chapter 312 compliant trip tickets. The formula for measurement and payment is provided below. %TS (Daily Composite) x [Gross Weight — Tare Weight (in tons)] = Dry Tons/truck Dry Tons/truck x bid unit price per dry ton = payment to Contractor per truck The monthly invoice amount will be the sum of all payments to Contractor per truck during the respective pay period plus any mobilization or percent complete on any other bid item. D. Mobilization will be measured as specified in section 01 29 01 Measurement and Basis for Payment. E. Aquatic Vegetation Removal will be measure as specified in section 01 29 01 Measurement and Basis for Payment. 4.02 PAYMENT Payment for dredging, dewatering, and hauling shall be on a unit price basis per dry ton (DT) and must be fully substantiated with official measurements (See Section 4.01 Measurement above). All other work, materials, permits, fuel costs, water service, electrical service, turbidity curtain and any temporary or permanent improvements installed necessary to complete the Scope of Work are ONSWTP Intermediate Sludge Removal Phase I 46 76 11-13 considered subsidiary to this pay item. Only Mobilization and Aquatic Vegetation Removal will be paid separately. END OF SECTION ONSWTP Intermediate Sludge Removal Phase I 46 76 11-14 Attachment A to Technical Specification 46 76 11 Dredging, Dewatering and Hauling Requirements Sample Trip Ticket Manifest/Trip Ticket for Hauled Waste Trip Ticket Number : Generator Info Name: O.N. Stevens Water Treatment Plant (Address: 13101 Leopard Dr City: Corpus Christi 'State: TX 'zip: 78401 'Phone: (361) 826 1200 Indicate the Waste Type (must check one) and, ❑ Wastewater Treatment Plant Sludge ❑ Chemical Toilet ❑ Wastwater from Sanitary Sewer System ❑� Other (Specify Source and Type of Waste if applicable, the interceptor ❑ Food Service ❑ Septic/Sewage ❑ Grit/Mud/Lint/Oil Water Treatment (or trap) capacity: Grease Trap Holding Tank Trap Plant Residuals Capacity = (gal.) Capacity= (gal.) Capacity = (gal.) Dry Tons Removed: 'Date Removed: As the representative for the generator of this transported to a facility authorized by the Texas Printed Name: waste, I certify that the information Commission of Environmental provided is true Quality (TCEQ) to Signature: and correct; and that this waste is to be receive these wastes. Transporter Info Business Name: 'Address: City: 'State: Zip: 'Phone: TCEQ Registration Number: Vehicle License Number: Tare Weight: 'Gross Weight: 196 Total Solids Lab Result: Dry Tons Transported: 'Date Relinquished: As the representative for the transporter of this in accordance with Title 30 of the Texas Administrative Printed Name: waste, I certify that the information Code, Chapter 312, provided is true Subchapter G. Signature: and correct and that this waste was collected Transfer Info Note: This section is for documenting transfers of wastes between vehicle a Type V facility that is either operation under the same permitted by or registered TCEQ Registration Number. The transfer of with the TCEQ. waste to any secondary transporter must be at 1. Was this waste transferred to the vehicle identified If YES, indicate the previous Manifest/Trip Ticket 2. Is his waste being transferred from the vehicle IF YES, complete the section below for the vehicle Info" and the original "Generator Info" (duplication above from a previous No. here: identified above to a different accepting this waste and of the generator's signature transporter vehicle? (new) transporter initiate a new Manifest/Trip would not be required). vehicle? Ticket including the new "Transporter New Manifest/Trip Ticket Number: New Vehicle License Number: Dry Tons Transferred: Transfer Date: As the representative for the transporter receiving Printed Name: this transferred waste, I certify that the information Signature: provided is true and correct. 1 Receiver Info Facility Name: Cefe Valenzuela Landfill 'Address: 2397 Co Rd 20 City: Robstown 'State: TX Zip: 78380'Phone: (361) 826-8035 Check One: 1 Disposal ❑ Permitted ❑ Registered Site Transfer Station Transfer Station TCEQ Type I or Type or TCEQ Registration V Permit No.: No.: Tare Weight: Gross Weight: 96 Total Solids Lab Result: Dry Tons Received: Date Received: Time Received: As the representative for the facility receiving this - The TCEQ has authorized this facility to accept - The water was received by this facility on the - The waste has been transferred , recycled, or Printed Name: waste, I certify that : the waste specified under date and time indicated; and disposed of as required by "Generator Info" above; the TCEQ authorization Signature: for this facility. Attachment B to Technical Specification 46 76 11 Dredging, Dewatering and Hauling Requirements City of Corpus Christi Hauler Permit Requirements HAULER PERMITS General Instructions and Information All haulers of solid waste are required to have permits. Permits are valid from October 1st through September 30th of each year. There are two classifications of solid waste haulers affected by the permitting process and they are as follows: • Permitted Solid Waste Self -Hauler & Landscaper: Any person, business, commercial establishment, or industrial facility, other than a residential customer that collects, transports, or disposes of solid waste generated by the person, business, commercial establishment, or industrial facility, who has a solid waste hauler permit issued under Article VIII of the ordinance. Permit fee is $5Olyear. • Permitted Solid Waste Hauler for Hire: Any person that collects, transports, or disposes of solid waste of another person and who has a solid waste hauler permit issued under Article VIII of the ordinance. Permit fee is $1 DOlyear. Reporting Requirements: Each permitted solid waste hauler for hire shall submit a monthly certified statement on a form (provided by the City) to the Director showing the total Municipal Solid Waste System Service Charges (MSWSSC)* collected from solid waste customers who are located within the city, and the total MSWSSC fees that were billed to solid waste customers, but uncollected by the permitted solid waste hauler. (See Exhibit 6) *Municipal Solid Waste System Service Charge (MSWSSC): The purpose of the Municipal Solid Waste System Service Charge (MSWSSC) is to fairly assess solid waste system costs to the generators of waste in our city. Each statement must be accompanied by an affidavit signed by an officer of the permitted solid waste hauler for hire before a notary public that certifies that the information is true and accurate. On the 15th day of each month, the solid waste hauler for hire must submit the form outlined above for the previous month. The solid waste hauler must fill out the form with yardage and/or tonnage collected by category, total the MSWSSC owed for the previous month, and submit with a check to the City. Penalty for late MSWSSC Payment: If payment in full is not made on or before the due date (15th day of each month), the hauler shall pay an administrative late fee of $100 and any amount remaining unpaid shall bear interest at the rate of one and one half (1%) percent per month or the highest rate that may be lawfully charged, whichever is less, from the due date to the actual date of payment. Distribution of Permits & Stickers: Permits and stickers will be issued following receipt of a completed application, payment of required fees, and review of insurance by Risk Management and final approval by the Director of Solid Waste Operations or his designated representative. In addition to the permit fee, there is a yearly sticker fee of $1 per vehicle, trailer, or container. The yellow permit number sticker fee for new haulers or lost stickers will be $5.00. The stickers will be placed on the driver's side fender of the vehicle, trailer, or container in an unobstructed location that is clearly visible. Please ensure: V Application is fully completed and notarized ✓ includes copies of required insurances ✓ you have a copy of your current driver's license ✓ a copy of sales tax permit payment of the required fees in the form of a check or money order to avoid delays in processing the application. Liability Insurance Requirements: Please note that the City MUST be named as an additional insured with a waiver of subrogation on all certificates. City of Corpus Christi Solid Waste Operations 2016 - 2017 Commercial Hauling Permit Application Date of application: 1.) Applicant Name: FOR OFFICE USE Permit #: Approval Date: (Last) (First) 2.) Applicant Business Name: 3.) Business Physical Address: (Street Name & #) (City) 4.) Business Mailing Address: (State) (Zip) (P.O. Box or Street Name & #) (City) (State) (Zip) 5.) Business Phone Number: ( ) 6.) Business Fax Number: ( ) 7.) E-mail Address (if any): 8.) Number of vehicles the applicant desires to operate: 9.) Location where vehicles will be stored when not in use: 10.) List vehicles / containers / dumpsters to be operated on Attachment I (MUST include year 1 make / model, vehicle identification number, and license plate number). 11.) Provide description of the nature and character of service rendered to customers: 12.) Provide a description of the areas of the City in which the applicant proposes to provide service: Hauling Permit Application Form, Page 1 of 2 13.) Will service be provided to customers or premises located outside the City of Corpus Christi city limits? (Please circle) Yes No 14.) If applicant is a Self Hauler, please identify the types of waste generated and the type of activity from which the waste is generated: 15.) A copy of the applicant's sales tax permit issued by the Texas Comptroller of Public Accounts must be attached to this application (when applicable). I, (Owner/Designee) DO HEREBY ATTEST THAT ANY SOLID WASTE COLLECTED OR TRANSPORTED WITHIN THE CITY WILL BE DISPOSED OF AT A FACILITY THAT IS AUTHORIZED BY THE TEXAS COMMISSION ON ENVIRONMENTAL QUALITY TO ACCEPT THE TYPE OF SOLID WASTE THAT (Business Name) HAS COLLECTED OR TRANSPORTED AND THAT ALL FEDERAL, STATE OF TEXAS, AND LOCAL LAWS WILL BE COMPLIED WITH WHEN PERFORMING PURSUANT TO THE CITY PERMIT. (Owner/Designee Signature) (Date) , certify that I have applied to the Department of Solid Waste Operations of the City of Corpus Christi, Texas for a solid waste hauling permit, and that the information provided by me in this application is true and correct. (Owner/Designee Signature) (Date) THIS SECTION FOR NOTARIZATION PURPOSES: State of Texas County of Before me, a notary public, on this day personally appeared , known to me (or proved to me on the oath of or through (description of identity card or other document)) to be the person whose name is subscribed to the foregoing document and, being by me first duly sworn, declared that the statements therein contained are true and correct. Notary Public's Signature Hauling Permit Application Form, Page 2 of 2 Application for Solid Waste Vehicle Registration Sticker* Applicant Name: *Registration fee: $1 /vehicle. Registration is for each vehicle used to transport solid waste within the City or to a City owned solid waste facility. 1 2 Year:. Make & Model: Vehicle Identification # (VIN): License Plate #: Tare Weight: Gross Weight: Total Cubic Capacity of Body: Year: Make & Model: Vehicle Identification # (VIN): License Plate #: IHHIIIWIILHIHI Tare Weight: Gross Weight: Total Cubic Capacity of Body: 3 Year: Make & Model: Vehicle Identification # (VIN): License Plate #: Tare Weight: Gross Weight: Total Cubic Capacity of Body: 4 Year: Make & Model: Vehicle Identification # (VIN): License Plate #: Tare Weight: Gross Weight: Total Cubic Capacity of Body: 5 Year: Make & Model: Vehicle Identification # (VIN): License Plate #:. Tare Weight: Gross Weight: Total Cubic Capacity of Body: Hauling Permit Attachment I, Page 1 of 4 Application for Solid Waste Vehicle Container Registration Sticker* Applicant Name: *Registration fee: $1 1 container (only if the container is a roll -off that transports debris to the landfill). Set 1 Name of Container Manufacturer: Container Model: Total Number of Containers in Set 1: Total Cubic Capacity of Container: Tare Weight: Set 2 Name of Container Manufacturer: Container Model: Total Number of Containers in Set 2: Total Cubic Capacity of Container: Tare Weight: Set 3 Name of Container Manufacturer: Container Model: Total Number of Containers in Set 3: Total Cubic Capacity of Container: Tare Weight: Set 4 Name of Container Manufacturer: Container Model: Total Number of Containers in Set 4: Total Cubic Capacity of Container: Tare Weight: Set 5 Name of Container Manufacturer: Container Model: Total Number of Containers in Set 5: Total Cubic Capacity of Container: Tare Weight: Hauling Permit Attachment I, Page 2 of 4 Application for Solid Waste Dumpster Registration Sticker* Applicant Name: Location where dumpsters will be stored when not in use: Nature and character of the service the applicant proposes to render within the City: Statement of whether or not the service will be provided to any premises not located in the City: `Registration fee: $1 1 dumpster (no sticker required if the dumpster is not transported to the landfill). Set 1 Name of Dumpster Manufacturer: Dumpster Model: Total Number of Dumpsters in Set 1: Gross Weight of Dumpster: Total Cubic Capacity of Dumpster: Tare Weight of Dumpster: Set 2 Name of Dumpster Manufacturer: Dumpster Model: Total Number of Dumpsters in Set 2: Gross Weight of Dumpster: Total Cubic Capacity of Dumpster: Tare Weight of Dumpster: Set 3 Name of Dumpster Manufacturer: Dumpster Model: Total Number of Dumpsters in Set 3: Gross Weight of Dumpster: Total Cubic Capacity of Dumpster: Tare Weight of Dumpster: Hauling Permit Attachment I, Page 3 of 4 Application for Solid Waste Can Account* The definition for "can account" per Chapter 21, Article I, Section 21-1, of the Code of ordinances is as follows: "Can account: A commercial or residential account who sets out its solid waste in conventional refuse receptacles of 100 gallons or less capacity for collection by a permitted solid waste hauler." Applicant Name: *Each solid waste hauler's permit holder shall register each service stop where it collects solid waste from a can account located within the City. Hauling Permit Attachment I, Page 4 of 4 Address of Can Account: Frequency of Service Provided to Can Account: Number of Receptacles: 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Hauling Permit Attachment I, Page 4 of 4 EXHIBIT INSURANCE REQUIREMENTS I. HAULERS FOR HIRE - LIABILITY INSURANCE A. Haulers for Hire must not commence work under this contract until all insurance required has been obtained and such insurance has been approved by the City. Haulers for Hire must not allow any subcontractor to commence work until all similar insurance required of any subcontractor has been obtained. B. Haulers for Hire must furnish to the City's Risk Manager and Director of Solid Waste, one (1) copy of Certificates of Insurance with applicable policy endorsements showing the following minimum coverage by an insurance company(s) acceptable to the City's Risk Manager. The City must be listed as an additional insured on the General liability and Auto Liability policies, and a waiver of subrogation is required on all applicable policies. Endorsements must be provided with Certificate of Insurance. Project name and/or number must be listed in Description Box of Certificate of Insurance. TYPE OF INSURANCE MINIMUM INSURANCE COVERAGE 30 -day advance written notice of cancellation, non -renewal, material change or termination required on all certificates and policies. Bodily Injury and Property Damage Per occurrence - aggregate Commercial General Liability including: 1. Commercial Broad Form 2. Premises — Operations 3. Products/ Completed Operations 4. Contractual Liability 5. Independent Haulers for Hires 6. Personal Injury- Advertising Injury $100.000 Per Occul ence AUTO LIABILITY (including) 1. Owned 2. Hired and Non -Owned 3. Rented/Leased $250,000 Combined Single Limit C. In the event of accidents of any kind related to this contract, Haulers for Hire must furnish the Risk Manager with copies of all reports of any accidents within 10 days of the accident. II. ADDITIONAL REQUIREMENTS A. Haulers for Hire shall obtain and maintain in full force and effect for the duration of this Contract, and any extension hereof, at Haulers for Hire's sole expense, insurance coverage written on an occurrence basis by companies authorized and admitted to do business in the State of Texas and with an A.M. Best's rating of no less than A- VII. B. Haulers for Hire shall be required to submit a copy of the replacement Certificate of Insurance to City at the address provided below within 10 days of any change made by the Haulers for Hire or as requested by the City. Haulers for Hire shall pay any costs incurred resulting from said changes. All notices under this Exhibit shall be given to City at the following address: City of Corpus Christi Attn: Risk Manager P.O. Box 9277 Corpus Christi, TX 78469-9277 C. Haulers for Hire agrees that, with respect to the above required insurance, all insurance policies are to contain or be endorsed to contain the following required provisions: • List the City and its officers, officials, employees, and volunteers, as additional insureds by endorsement with regard to operations, completed operations, and activities of or on behalf of the named insured performed under contract with the City, with the exception of the workers' compensation policy; • Provide for an endorsement that the "other insurance" clause shall not apply to the City of Corpus Christi where the City is an additional insured shown on the policy; • Provide thirty (30) calendar days advance written notice directly to City of any, cancellation, non- renewal, material change or termination in coverage and not less than ten (10) calendar days advance written notice for nonpayment of premium. D. Within five (5) calendar days of a cancellation, non -renewal, material change or termination of coverage, Haulers for Hire shall provide a replacement Certificate of Insurance and applicable endorsements to City. City shall have the option to suspend Haulers for Hire's performance should there be a lapse in coverage at any time during this contract. Failure to provide and to maintain the required insurance shall constitute a material breach of this contract. E. In addition to any other remedies the City may have upon Haulers for Hire's failure to provide and maintain any insurance or policy endorsements to the extent and within the time herein required, the City shall have the right to order Haulers for Hire to stop work hereunder, and/or withhold any payment(s) which become due to Haulers for Hire hereunder until Haulers for Hire demonstrates compliance with the requirements hereof Nothing herein contained shall be construed as limiting in any way the extent to which Haulers for Hire may be held responsible for payments of damages to persons or property resulting from Haulers for Hire's or its subcontractor's performance of the work covered under this contract. It is agreed that Haulers for Hire's insurance shall be deemed primary and non-contributory with respect to any insurance or self insurance carried by the City of Corpus Christi for liability arising out of operations under this contract. H. It is understood and agreed that the insurance required is in addition to and separate from any other obligation contained in this contract. 2016 Insurance Requirements Solid Waste Department. Haulers for Hire EXHIBIT INSURANCE REQUIREMENTS I. SELF -HAULERS - LIABILITY INSURANCE A. Self -Haulers must not commence work under this contract until all insurance required has been obtained and such insurance has been approved by the City. Self -Haulers must not allow any subcontractor to commence work until all similar insurance required of any subcontractor has been obtained. B. Self -Haulers must furnish to the City's Risk Manager and Director of Solid Waste, one (1) copy of Certificates of Insurance with applicable policy endorsements showing the following minimum coverage by an insurance company(s) acceptable to the City's Risk Manager. The City must be listed as an additional insured on the General liability and Auto Liability policies, and a waiver of subrogation is required on all applicable policies. Endorsements must be provided with Certificate of Insurance. Project name and/or number must be listed in Description Box of Certificate of Insurance. TYPE OF INSURANCE MINIMUM INSURANCE COVERAGE 30 -day advance written notice of cancellation, non -renewal, material change or termination required on all certificates and policies. Bodily Injury and Property Damage Per occurrence - aggregate Commercial General Liability including: 1. Commercial Broad Form 2. Premises — Operations 3. Products/ Completed Operations 4. Contractual Liability 5. Independent Self-Haulerss 6. Personal Injury- Advertising Injury $100.000 Per Occturence AUTO LIABILITY (including) 1. Owned 2. Hired and Non -Owned 3. Rented/Leased $250,000 Combined Single Limit C. hi the event of accidents of any kind related to this contract, Self -Haulers must furnish the Risk Manager with copies of all reports of any accidents within 10 days of the accident. II. ADDITIONAL REQUIREMENTS A. Self -Haulers shall obtain and maintain in full force and effect for the duration of this Contract, and any extension hereof, at Self-Haulers's sole expense, insurance coverage written on an occurrence basis by companies authorized and admitted to do business in the State of Texas and with an A.M. Best's rating of no less than A- VII. B. Self -Haulers shall be required to submit a copy of the replacement Certificate of Insurance to City at the address provided below within 10 days of any change made by the Self -Haulers or as requested by the City. Self -Haulers shall pay any costs incurred resulting from said changes. All notices under this Exhibit shall be given to City at the following address: City of Corpus Christi Attn: Risk Manager P.O. Box 9277 Corpus Christi, TX 78469-9277 C. Self -Haulers agrees that, with respect to the above required insurance, all insurance policies are to contain or be endorsed to contain the following required provisions: • List the City and its officers, officials, employees, and volunteers, as additional insureds by endorsement with regard to operations, completed operations, and activities of or on behalf of the named insured performed under contract with the City, with the exception of the workers' compensation policy; • Provide for an endorsement that the "other insurance" clause shall not apply to the City of Corpus Christi where the City is an additional insured shown on the policy; • Provide thirty (30) calendar days advance written notice directly to City of any, cancellation, non- renewal, material change or termination in coverage and not less than ten (10) calendar days advance written notice for nonpayment of premium. D. Within five (5) calendar days of a cancellation, non -renewal, material change or termination of coverage, Self -Haulers shall provide a replacement Certificate of Insurance and applicable endorsements to City. City shall have the option to suspend Self-Haulers's performance should there be a lapse in coverage at any time during this contract. Failure to provide and to maintain the required insurance shall constitute a material breach of this contract. E. In addition to any other remedies the City may have upon Self-Haulers's failure to provide and maintain any insurance or policy endorsements to the extent and within the time herein required, the City shall have the right to order Self -Haulers to stop work hereunder, and/or withhold any payment(s) which become due to Self -Haulers hereunder until Self -Haulers demonstrates compliance with the requirements hereof. Nothing herein contained shall be construed as limiting in any way the extent to which Self -Haulers may be held responsible for payments of damages to persons or property resulting from Self-Haulers's or its subcontractor's performance of the work covered under this contract. G. It is agreed that Self-Haulers's insurance shall be deemed primary and non-contributory with respect to any insurance or self insurance carried by the City of Corpus Christi for liability arising out of operations under this contract. H. It is understood and agreed that the insurance required is in addition to and separate from any other obligation contained in this contract. 2015 Insurance Requirements Solid Waste Department. Self -Haulers 7/28/2015 ds Risk Management EXHIBIT B Fees for Payment of MSWSSC for Permitted Haulers MSWSSC is only paid on solid waste collected inside the city limits (ICL) WASTE COLLECTED IN THE CITY TYPE OF CUSTOMER BASE TIP FEE STATE FEE MSWSSC TOTAL Cash by Weight $35.61/Ton $1.25)Ton $10.24/Ton $47.10/Ton Cash by Loose CY Not Weighed $9.941CY $.05/CY $0.311CY $10.301CY Cash - Compacted Load Not Weighed/CY $12.96/CY $.251CY $0.31/CY $13.521CY Cash - Construction & Demolition Debris/CY $12.96{CY $.251CY $0.31CY $13.521CY Cash -Heavy Brush & Yard Waste/CY $12.96/CY $.25/CY $0.31/CY $13.521CY *Cash w{Put or Pay Contract $26.71/Ton $1.25)Ton $15.14/Ton or $0.91/CY $43.10 ($15.14/Ton or $0.91/CY) **Account w/Put or Pay Contract $26.71/Ton $1.25/Ton $15.14rron or $0.91/CY $43.10 ($15.14/Ton or $0.91 CY) **Account w/o Put or Pay Contract $35.61)Ton $1.25/Ton $10.24/Ton or $0.31/CY $47.10 ($10.24/Ton or $0.311CY) Hauler Disposing at Non -City Site -0- -0- $34.571Ton or $1.40/CY $34.57/Ton or $1.40/CY *Any mixed Toads will not be assessed the MSWSSC. **ATI MSWSSC fees must be remitted by the 15th day of the month following collection by the permitted hauler. MSWSSC Collection Fees, Page 1 of 2 WASTE COLLECTED OUTSIDE THE CITY TYPE OF CUSTOMER BASE TIP FEE STATE FEE MSWSSC TOTAL Cash by Weight $35.61/Ton $1.25ITon NONE $36.86ITon Cash by Loose CY Not Weighed $9.94CY $.05ICY NONE $9.991CY Cash Compacted Load Not Weighed/CY $12.96/CY $.251CY NONE $13.21/CY Cash Construction & Demolition Debris/CY $12.96/CY $.251CY NONE $13.21/CY Cash Heavy Brush & Yard Waste/CY $12.96/CY $.251CY NONE $13.21/CY Cash wlPut or Pay Contract $26.71/Ton $1.25/Ton NONE $27.96ITon Account w/Put or Pay Contract $26.71/Ton $1.25ITon NONE $27.96/Ton Account w/o Put or Pay Contract $35.61/Ton $1.25ITon NONE $36.86/Ton Hauler Disposing At Non -City Site NIA NIA N/A N/A MSWSSC Collection Fees, Page 2 of 2 MSWSSC Remittance Form Reporting Period: From To Permit Holder Name: PERMIT #: Solid Waste collected from inside the City limits (ICL) and disposed at a City -owned landfill: Amount Charge per Ton / Cubic Yard Total $ Collected or can account pickups Tons X = $ *Cubic Yards X = $ Can Accounts X = $ Roll -off Containers X = $ Corpus Christi Municipal Code, Sec. 21-47(c)(3) 0.5% credit = $< * Size of containers multiplied by the frequency of Total: $ service totaled for all accounts serviced. Solid Waste collected from inside the City limits (ICL) and disposed at other than City -owned landfill: Amount Charge per Ton / Cubic Yard Total $ Collected or can account pickups Tons X = $ *Cubic Yards X = $ Can Accounts X = $ Roll -off Containers X = $ Corpus Christi Municipal Code, Sec. 21-47(c)(3) 0.5% credit = $‹ * Size of containers multiplied by the frequency of service totaled for all accounts serviced. Total: $ 1. Fees collected in current month 2. less: 0.5% discount (line 1 x .005) 3. Amount remitted (enclose payment) 4. Prior fee balance due from customers (prior month line 8) $ 5. Add: Fee billed in current month $ 6. Less: Fees collected in current month (line 1 above) $ 7. Less: Over 60 days past due (attach separate list with copies of invoices) 8. Ending balance / next month beginning balance MSWSSC Remittance Form, Page 1 of 2 MSWSSC charges for solid waste disposed At a City -owned landfill: 1. Account customers with Put or Pay contract: $15.141 ton $0.91 1 cubic yard 2. Account customers wlout Put or Pay contract: $10.241 ton $0.31 1 cubic yard 3. Can Accounts: $4.17 per month 4. Roll -off Containers: (with Put or Pay) $2.40 / cubic yard capacity per collection (w/out Put or Pay) $0.82 / cubic yard capacity per collection MSWSSC charges for solid waste disposed at other than City -owned landfill: 1. All Permitted Haulers: $34.571 ton 2. Can Accounts: $4.17 per mouth 3. Roll -off Containers: $3.691 cubic yard capacity per collection $1.401 cubic yard (Authorized Officer) DO HEREBY CERTIFY THAT THE INFORMATION REPRESENTED ON THIS STATEMENT ACCURATELY REFLECTS THE TONNAGE OR CUBIC YARDS COLLECTED IN THE CITY OF CORPUS CHRISTI DURING THE PAST MONTH. (Signature) (Date) THIS SECTION FOR NOTARIZATION PURPOSES: STATE OF COUNTY OF BEFORE ME, the undersigned authority, on this day personally appeared known to me to be the person whose name is subscribed to the foregoing instrument and acknowledged to me that he/she executed the same for the purpose and consideration therein expressed. GIVEN UNDER MY HAND AND SEAL OF OFFICE, this the day of (Notary Signature) This form may be duplicated or additional copies obtained by contacting: Leticia Varela at (361) 826-1965 or Norma Salinas at (361) 826-1977. Submit Completed Form & Payment before the 15th of the month to: City of Corpus Christi Solid Waste Operations 2525 Hygeia Street Corpus Christi, TX 78415 MSWSSC Remittance Form, Page 2 of 2 Required Records for Haulers for Hire (a) Each permitted solid waste hauler for hire shall maintain the following information in a format that can be readily examined by the Director or an independent auditor that is acceptable to both the Director and the permitted solid waste hauler for hire: (1) A list of all customers located within the City or an industrial district created by the City including: (A) The customer's name; (B) The physical address of each location that is serviced; (C) The size and service level of any container(s) provided at each service location; (D) Whether the container is a roll-on/roll-off container, e.g., a container that is picked up and transported on a vehicle chassis to a disposal site; (E) The classification of the solid waste collected, e.g., commercial hazardous, household waste, special waste; (F) Whether or not the solid waste is compacted before disposal; and (G) The frequency of collection. (2) A list of all customers located outside the City whose solid waste is taken to a facility owned by the City for disposal, including: (A) The customer's name; (B) The physical address of each location that is serviced; and (C) The type of solid waste collected from the customer. (3) The routes taken on a daily basis by any vehicle used to collect solid waste within the City or any vehicle that disposes of solid waste at a City owned facility that is collected from outside the City. (4) Copies of all reports filed with the Texas Comptroller of Public Accounts that relate to any services provided or activities conducted within the City. (b) The permitted solid waste hauler for hire shall make all records required to be maintained under subsection (a) of this section available to the Director or auditor at the permitted solid waste hauler for hire's place of business at any time during normal business hours for inspection. The Director or auditor will provide reasonable advance notice that the hauler's records will be inspected. (c) If the Director or auditor has reason to believe that the Municipal Solid Waste System Service Charge being remitted to the City by the solid waste hauler does not accurately reflect the tonnage and yardage of waste collected, size of container provided, level of service, or disposal site for a specific customer, the hauler shall provide copies of any specific records relating to that customer or transactions involving that customer that are requested by the Director or auditor. (d) Any records relating to individual customers provided to the Director or auditor under this section, except specific records considered by the Director in resolving inconsistencies between a solid waste hauler's statements submitted under section 21-47 and the records maintained under this section, will be treated by the City as privileged commercial information under Section 552.110 of the Texas Public Information Act, Chapter 552, Texas Government Code, if each page of information that is provided to the Director is clearly marked and identified as proprietary information that should not be made available to the public. If a request is received for the information, the request and information will be forwarded to the Texas Attorney General for a determination under Section 552.301 of the Act. The City will withhold the information from the requester under Section 552.305 of the Act until after the Attorney General's decision is received. The City will only release the information if directed to do so by the Attorney General. FREQUENTLY ASKED QUESTIONS: 1. I haul trash from my business maybe once a month to keep the area clean. Do I need a permit to do this? Answer: Yes. 2. I haul yard waste and tree trimmings. I am usually charged by the cubic yard because I only use a pickup truck. Can I be charged by the ton, or am I restricted to cubic yards? Answer: We prefer to charge your Toad by the ton. 3. It seems to me that I am being penalized by being charged for cubic yards instead of tons. Answer: Tonnage is the most accurate form of measurement; using cubic yards is only an estimate. We will weigh all loads when applicable. 4. I am a permitted hauler and have to remit the $10.24 charge per ton to the City each month. When the City bills me, they give me a total due, no tonnage figure. I don't keep track of tonnage at my business. So on what do I base my payment? Answer: Tonnage is the most accurate form of measurement. For haulers who remit MSWSSC fees monthly or use a non -City owned landfill, you will now be required to track tonnages, cubic yards, or both, and remit the appropriate amount of MSWSSC to the City by the 15th of the month following the billing period. As a reminder, the City reserves the right, in accordance with City Ordinance, Chapter 21, to perform annual audits of haulers to ensure compliance of this requirement. 5. How can I find out more information about entering into a Put or Pay Agreement with the City? Answer: Contact Solid Waste Operations at (361) 826-1965. Information Contacts: Leticia Varela -- (361) 826-1965 Norma Salinas — (361) 826-1977 Fax -- (361) 826-1971 For Questions, Comments, or Complaints: Customer Call Center — (361) 826 -CITY (2489) Physical Address: City of Corpus Christi Solid Waste Operations 2525 Hygeia Street Corpus Christi, Texas 78415 "Cover Your Load" tips: • Use a TARP big enough to completely cover your trailer or truck bed — a minimum of four inches should overlap the sides, front and back of your load. • Tightly secure the tarp with ropes, bungee cords, netting or straps. • Put lighter items at the bottom of the load. • When transporting large items, make sure they are tied down and secured to the trailer or truck so they don't move. • A tarp is not required if the debris is completely enclosed by a Toad -carrying compartment. • Make sure your trailer or truck bed does not have holes, cracks or other openings where debris can escape. • Don't overload — keep material level with the trailer or truck bed. • Before leaving the landfill, remove any loose material that may remain in the trailer or truck bed. In Texas, failing to cover your Toad to prevent materials from escaping by blowing or spilling out of your trailers or trucks is against the law and carries a fine of up to $500 for the first offense. Trailers or trucks not appropriately secured are subject to additional fees/charges at the City of Corpus Christi landfill or collection center. Don't Correct Attachment 2 Drawings dVW NOI1VDO1 z4 111 pg11 Ej 1 i 2 11 - DM OF CORPvS CHRISTI, TEXAS MN, STEVENS WATER TREATMENT PLANT INTERMEDIATE SLUDGE REMOVAL PHASE 1 COVER SHEET CITY OF prey CORP T cHfils7+ 11111111E%A S UTILITIES ,—r...E DEPARTMENT O.Prrrn+.nr cr Engfn..rin® Services LW ...._,. 1 PMPOI m 1 taputyart R i C -z- .-_ ,� §. •I 11iii1 111111' iii111H Ali ii 11: i1 12 Ii 1 I I H 5' j!!i!, 111 I I I 11111 iii "I _iii O29 H 2 TYPICAL LEGENDISYM SOLS il _II 3 :•; �.e. R 444 8 € Orgi gg R iiia gggg RA�3y�5g53 99 . qq- ;qs 00 y Ax LJ I E9" 2 91Ir x �� :i.W. ns � r=8 .;FsRs Kip 8., c949.., - "; �.. •cr,F_. �r, _ y� �� P_ Rn_ 6 6•:as-., A _ Ew a c P A 88 g1g $ ., L9 5 GENERAL ABBREVIATIONS & 5 4 A 0 4,$ A% Ira ! s d i ®m.,¢ p . [3. a t� ., _ � v g i v y A A' 9 '� 8 $ ,By SY O I A DETARJSECTION ID SYSTEM $m 1s TESTING SCHEDULE w .. g y} 57 4 M' M mz NCPTY M b M % RIS' `j CITY OF CORPUS CHRISTI, TEXAS O.N. STEVENS WATER TREATMENT PLANT INT ER.N EDUkTE ASE RENUYALail PHASE 1 OF CORPUS CF}RIST! TEXASIMF ....'.".'w =I-r� In NI Y Wlmde aumeyn: F ppI Ri ti TYPICAL LEGEND AHD TESTING SCHEDULE .UTtLi NES :. DEPARTMENT Jeparrmenf e0 FngfneerMg SaMces au pa i€k m ;pm Edi m rga OP aRa$ Pg Pa A$$ 9 a i aa 3 7pR2 30 {& � m 3 3.3 A� F F! �� ! ,g^ �gggg R 1pp22 ggg Y FFF $gFpp 4 '� p 11 ig5 g ' p@ 4 � YA 21; g 55 d •g 9€5 9 9 g II 3A g, € y# ApR i 5 Rr IN9 a Ile} :yy !@ ga ,x ap P a.6 F i o - o^ .. .. !3" C m i a s �55 �� gg' m rad & i g ^^ $g 3AB ^ R m 11 i �'pe a 0€ gtyg Bin 1 :�� it yq A E ; R 0 F r ,' 4" i 4 l' ii �p fae E p 1 R r 9 1 R �n h 2 g~ �R S ^4 , axa£ `C$ ,� F C p 9 #1 1% 1 m I i' , 9^ IN 6.AF R a a R' 3 # e a IN g F 9 g 1 $@$@g gY EJ [�[€ 4 n € 5 @ ^ # s 1 fi .' N a R 2e N ^a CCCC 9� F 1a ,3 3 h rrAA� � q pa Y t 9 6 d 4 N 1 i8 liE a Y 6 Rl € R r!$ � O g{ p Gp p 11 g vA 9q El P $ a 11 1 gl qqpp s 1�!!!tltl�4�s !i 1 1 $3£eP El 9I 3� Ql i 5! �I 55€i pp� 7A p2 A €R l R,il �y a]ag a€1 ®y „RRR^ k' T G� & �F EA 3i R & q- �R —Pi COMPLIANCE REQUIREMENTS FOR STORMWATER DISCHARGES FROM CONSTRUCTION SITES (TPDES GENERAL PERMIT T%R150000) Rpx tl a @ i # A € 1 iA iP' i` g� A AA s # ;Jq is 1 _ § 5y R` 8 ii F C , A y F AY g g C 1 p gii R1 M R lig! 4 A , 1 i n_ i T3 I S pp® m $ yp i x GGG m SR d p2� Q i ii RYiy ¢ F� RA S € v�E g p�p 1 ifs OaO �' 9� p� R R € 7g! # mRf 3a0 yxyi Ag # }� G 5 g Ai Na 0 3a R ig a R p ]R I m { A !!1.333 444gR � 'm'� i. S y� i 3 $ �2 3 3R sL'� ? Fid jyA Iyt� 8 RR M q R 3 ¢ 1i gi 1. $ 1 Ai i i �$3A a e oo PPPP ..ii b o f . g d r R i . 1191 Iii V /319 NU aff VI 4 VAN I/ itt I$3 i$ 1 AO 1 I 1 IP ql 2- g e' / gigi 10 I@ g pat A O € Sig .tl $k 1 8 Sp a CCe 3x IJ#P 555 1t R 11 1 t i is a r R9 m I 8 g fi p • .we. � t ._ API �� ' \ wiirir G9G i1�� r MI N iC 9 M 1 2. Iigti b % R.1 ' CITY OT CORPUS CHRISTI, TEXAS O.N. STEVENS WATER TREATMENT PIANT INTERMEDIATE SLUDGE REMOVAL PHASE 1 CITY OF CORPIJ,S CF}RIS TJ TEXAS UT fLi NES . DEPARTMENT ,...1=1:= ergIn N� Y lmae aurreyn:EZti -r �t ppI Ri 3 p GENERAL NOTES AND ESTIMATED QUANTITIES s. 2 0) CITY OF CORPUS CHRISTI, TEXAS 0.11-STEVENS WATER TREATMENT PLANT INTERMEDIATE SLUDGE REMOVAL PHASE 1 OVERALL SITE PLAN CITY OF CORPUS CF}RISR TEXAS UTILIUES DEPARTMENT Jeparfmanf 0 EngfneeAng 5aM0a LIWIr engineers aurveynis • er_ SI h YE IA I On b 0) CITY OF CORPUS CHRISTI, TEXAS O.N. STEP ENS WATER TREATMENT PLANT INT ERA. EDIATE SLUDGE REMOVAL PHASE PROPOSED DREDGING PLAN CITY OF CORPUS CHRISR TEXAS VTI LI RES 7.05 DEPARTMENT •.,.ipnf a0 SaMces. LIWIr engineers aurveynis aal I3yY I i _ 47L TiRRRM3 A S' M. HI wT p MGRMO P? T 2i2WA E 2 GM qxa*, 'MT r �wr; ranV xr a PAP 0 =PAD. CAi CIWRAI.I CITY of CORPUS CHRISTI TEXAS Departmeni of E4nering Semite On b Ids, o E R CITY OF CORPUS CHRISTI, TEXAS O.N. STEVENS WATER TREATMENT PLANT INT ERN EDIATE SLUDGE RE MORAL PHASE 1 OVERALL ONE.LINE DIAGRAM FOR EXISTING SLUDGE HANDLING MCC CITY OF CORPUS CF}RISR TEXAS UTILIUES WS DEPARTMENT Jeparfmanf 0 FnglneeAng SaMcea laMirr englneoni 1 erohlteols 1 surveyors FLEW= 1 PA T RSR -1 WYIRI ELM TM Y NM IIIgR. DM FRN[. ELM 10 WRIT PROPSSEj ENWT ItINALIRO M"" CNE-!. E CMGRM CITY of CORPUS CHRISTI TEXAS Osparinvent of Ergesserhig Swims On 1 Ili m EIS O y CITY OT CORPUS CHRISTI, TEXAS C.N. STEVENS WATER TREATMENT PLANT INT ERN EDIATE SLUDGE RE MORAL PHASE 1 EX 1ST! NG SLUDGE HANDLING MCC ONE.L!NE DIAGRAM CITY OF CORPUS CF}RISR TEXAS UTILIUES = DEPARTMENT Jeparfinenf 0 FnglneeAng SIMcee laMirr englneoni 1 erohlteols 1 wren `eieLl=.s ...w. mei... Attachment 3 [16246 Intermediate Sludge Removal Phase 1 Mandatory Pre -Bid Workshop Q and A E16246 Intermediate Sludge Removal Phase 1 Mandatory Pre -Bid Workshop Q and A 11/11/2016 REVISION 2 Item Question/Comment Resolution4 Resolution Date Resolution Distributed 1 What hours will the contractor be allowed to work, 24/7? Weekends? Hours TBD (approx. 7-6 Mon. - Sun. for dredging and dewatering). Subject to noise ordinance 11/3/2016 Y 2 Is there a daily limit that can be delivered to landfill (ton or CY)? No limit. 11/3/2016 Y 3 Any days the landfill will not be open to accept residuals? Holidays, Weekends? Landfill will accept residuals 7 a.m. - 5 p.m. Mon. - Sat. but Sat. Hauling schedule is still TBD. 11/2/2016 Y 4 What's the coagulant and polymer currently used at ONSWTP? Alum coagulant and cationic polymer 11/2/2016 Y 5 Can the pond {Lagoon No. 7) be taken out of service? No, the pond must remain in service and the decant pump station protected from excessive solids. 11/2/2016 Y 6 Can the material be beneficially reused via land application? It's not a desirable material but some area WTP's do land apply. Not allowed in this contract. 11/2/2016 Y 7 If land application is allowed, can the material be transported in liquid form (in lieu of dewatering)? Land application is not allowable in this contract due to lack of permitted recipients in the area. 11/2/2016 Y 8 When is the project considered complete? Amount of DT moved or residuals blanket elevation? Quantity of DT removed, as mutually agreed upon during contract award (dependent on unit price). 11/2/2016 Y 9 Does the dewatering polymer need to be NSF approved? Yes, all filtrate will be returned to treatment process. 11/2/2016 Y 10 Is the power at the site provided (paid for) by the customer? Preliminarily, elect. cost is subsidiary to DT bid item. Bid pkg. to ID power source and cost responsibility. 11/2/2016 Y 11 Can the dewatering filtrate be discharged back to the pond? Yes, using NSF approved polymer. 11/2/2016 Y 12 Are the stated milestones achievable? Yes 11/3/2016 Y 13 Is there a preferred route to Cefe Valenzuela? Hearn Rd. 11/3/2016 Y 14 What are the existing conditions in the pond? residuals depth, pond limits, flows? Exhibit provided at workshop and will be updated in bid package along with min and max WSE. 11/2/2016 Y 15 Is there a set residuals sampling date for contractors? Yes, date is TBD 16 Is there a preferred residuals laydown area at Cefe? TBD Page 1 of 3 11/11/2016 Item # Question/Comment Resolution Resolution Date Resolution Distributed 17 Who is responsible for removing cattails? Contractor. This will likely be a separate bid item. 11/3/2016 Y 18 Will there be opportunity for questions after the bid package is published? Yes, a deadline will be included in the advertisement. 11/3/2016 Y 19 Who will conduct paint filter tests @ each location (plant and landfill)? City staff will at the landfill and contractor will at the plant. 11/3/2016 Y 20 Will the official scale reading be at the landfill or plant? Landfill's scale will be used. 11/3/2016 Y 21 Will there be pre -approved testing labs listed? Yes, bid package will include pre -approved labs. 11/3/2016 Y 22 Will renewal option be mutual or sole discretion of the City? Can contractor decline the renewal offer? Contractors will have option to decline. 11/3/2016 Y 23 Does the lagoon have a liner that needs to be protected. Yes, clay liner. 11/3/2016 Y 24 What is min. and max. WSE in lagoon #7? TBD, this will be provided in bid package. 25 Are there additional background checks required? TBD, ONSWTP specific criteria will be investigated and provided in bid documents. 26 Are prevailing wage rates applicable? Yes, TX31 and TX75 11/3/2016 Y 27 Will there be provisions to allow for contract time extensions {incl. milestones) for bad weather, etc. Yes, details will be included in bid package 11/3/2016 Y 28 Does schedule consider variation in percent solids with depth, particularly first milestone? Not directly, first milestone has additional 30 days for mobilization and optimization of operations. 11/3/2016 Y 29 Will the city allow for the residuals to be beneficially reused via land application? No, due to the compressed schedule of this project being a priority and risk of missing scheduled milestones due to prolonged land permitting efforts. Please see meeting minute Q and A document on CivCast for further explanation. 11/11/2016 Y ALL FUTURE QUESTIONS AND RESPONSES MUST BE SUBMITTED THROUGH CIVCAST Page 2 of 3 11/11/2016 Item Question/Comment Resolution Resolution Date Resolution Distributed 30 Since it is already November 11th and the plans are not out yet, and no sample date has been scheduled, I would like to request an extension of the bid date since that allows only 10 business days between now and November 30 to take samples, analyze samples and produce a bid. I would like to request a bid extension to Wednesday, December T Bid date will remain as 11/30/2016. The plans will be posted to CivCast no later than Monday, 11-14-16. Scheduled sample times are included in the in Addendum bid package and are as follows: Tuesday (11-15-16) & Wednesday (11-16-16); at 8:00 a.m. and 5:00 p.m. & Thursday (11-17-16) at 8:00 a.m. and 12:00 p.m. Contact the Engineer, Ian Clements, iclements@Invinc.com or at 361-548-9915 to coordinate your visit. 11/11/2016 Y 31 32 ALL FUTURE QUESTIONS AND RESPONSES MUST BE SUBMITTED THROUGH CIVCAST Page 3 of 3 E16246 ONSWTP Intermediate Sludge Removal CivCast Project Description Notice to Contractors: Please be advised that this document is intended as a Pre -Solicitation notice. This is not a request for bids at this time. A project workshop is scheduled on November 2, 2016 at the O.N. Stevens Water Treatment Plant (ONSWTP) on 13101 Leopard St. The intent of the workshop is to solicit contractor feedback on the project outlined below. Additional information will be issued subsequent to the workshop an Addendum to this Pre -Solicitation notice for the bids. PART 1 PROJECT DESCRIPTION The project generally consists of dredging, dewatering, hauling and delivering to disposal site, water treatment plant residuals (sludge) from an existing storage lagoon. The residuals will be dredged from Lagoon No. 7 (Washwater Return Basin) located on-site at O.N. Stevens Water Treatment Plant, 13101 Leopard Street, Corpus Christi, Texas (ONSWTP). • The contractor will be responsible for providing all equipment, materials, labor, permits, testing, and supervision required to dredge, dewater (must pass paint filter test), haul and deliver the residuals to the disposal site. • The residuals will be disposed of at the Cefe Valenzuela Landfill, 2397 Co. Rd. 20, Robstown, TX 78380, owned by the City of Corpus Christi (approximately 20 miles from ONSWTP). • The Contractor will be responsible for conducting and providing documentation of trip tickets, manifests, paint filter tests for each load at the point of generation, moisture content tests for each load, and TCLP and TPH tests for every 25,000 CY disposed of at the landfill. • The contractor will NOT be responsible for tipping fees at the Cefe Valenzuela Landfill. • Existing access road will be available for Contractor access. Contractor will be responsible for maintaining the road in a condition that is suitable for their own use, and it is not expected that the Contractor will be responsible for restoring the road to its existing condition. PART 2 CONTRACT AWARD • Contractor award will be based on lowest, responsive and responsible bidder based on the depictive quantities provided in the Bid Form. The quantities and pricing will be for evaluation purposes only. The bid documents will include hypothetical quantities that help to establish unit costs for the required work. • Contract Price, measurement, and payment will be based on the price per dry ton (100% solids) removed from the lagoon within an estimated total expenditure of approximately $4M within 12 months. • This is a multi-year agreement; base year plus one optional year. The second year is budgeted at $4M. Renewal will be based on Contractor's successful performance, approval by the City/Engineer and concurrence from the Contractor. The renewal will allow for an economic adjustment, based upon published and acceptable indices. • The original contract and renewal will include milestones for dry tons (DT) removed during each period. • Milestones will be approximately 3,000 DT @ 130 days and 6,000 DT @ 230 days from NTP. Liquidated damages currently remain under consideration. • The total estimated quantity of sludge to be removed is approximately 20,000 DT or 10,000 DT per year. Page 1 of 2 E16246 ONSWTP Intermediate Sludge Removal CivCast Project Description PART 3 REQUIRED EXPERIENCE Bidder must demonstrate, or provide documentation of, the following; • Experience with dredging, dewatering, and hauling approximately 10,000 DT of sludge per year or 30 DT per day at a single site. • Successful completion of at least 5 projects of similar scope, scale, and complexity in the last 5 years, including project contact/references. • Capacity and ability to mobilize sufficient equipment, materials, and personnel to dredge, dewater and haul approximately 10,000 DT within one calendar year from contract Notice to Proceed (NTP) including a list of equipment and personnel proposed to be used for this project. • Detailed schedule, organizational chart, and work plan for approval before contract award. The schedule must show anticipated NTP date, begin and end of mobilization, all stated project milestones, and substantial completion date to dewater 10,000 DT. • Disclosure of regulatory or contract violations assessed to the Bidder within the past 5 years. • Tentative schedule of events is outlined below. Sludge samples for dewaterability, analytical, and polymer testing will be made available to bidders upon request. *A MANDATORY PROJECT WORKSHOP AND SITE VISIT WILL BE HELD ON NOVEMBER 2, 2016 from 10:00 AM to 12:00 PM @ ONSWTP, 13101 LEOPARD, CORPUS CHRISTI, TX 78410. TENTATIVE SCHEDULE OF EVENTS • Mandatory Project Workshop Location: ON Stevens Water Treatment Plant (ONSWTP) Date: November 2, 2016 Time: 10:00 AM -12:00 PM • Invitation for Bids Location: City Hall, City of Corpus Christi Date: November 30, 2016 Time: 2:00 PM • Anticipated NTP for Construction Date: February 2017 • Construction Start Date: February/March 2017 Page 2 of 2 00 30 00 BID ACKNOWLEDGEMENT FORM ARTICLE 1— BID RECIPIENT In accordance with the Drawings, Specifications, and Contract Documents, this Bid Proposal is submitted by American Process Group Inc. (type or print name of company) on: Wednesday, November 30, 2016 at 2:00 P.M for Q.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246). 1.01 Submit Bids, Bid Security and all attachments to the Bid (See Section 7.01 below) to the City's electronic bidding website at www.CivCastUSA.com. If submitting hard copy bids or bid security in the form of a cashier's or certified check, please send to: The City of Corpus Christi, Texas City Secretary's Office 1201 Leopard Street Corpus Christi, Texas 78401 Attention: City Secretary Bid - O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 Project No. E16246 All envelopes and packages (including FEDEX envelopes) must clearly identify, on the OUTSIDE of the package, the project name and number and that bid documents are enclosed. ARTICLE 2 — BIDDERS'S ACKNOWLEDGMENTS 2.01 Bidder proposes and agrees, if this Bid is accepted, to enter into an Agreement with Owner on the form included in the Contract Documents, to perform all Work specified or indicated in Contract Documents for the Contract Price indicated in this Bid oras modified by Contract Amendment. Bidder agrees to complete the Work within the Contract Times established in the Agreement or as modified by Contract Amendment and comply with the all other terms and conditions of the Contract Documents. 2.02 Bidder accepts all of the terms and conditions of SECTION 00 21 13 INVITATION AND INSTRUCTIONS TO BIDDERS, including those dealing with required Bonds. The Bid will remain subject to acceptance for 90 days after the opening of Bids. 2.03 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of its failure to complete Work in accordance with the schedule set forth in the Agreement. 2.04 Bidder acknowledges receipt of the following Addenda: Addendum No. Addendum Date Signature Acknowledging Receipt 1 11/11/16 eff 2 11/18/16 ' ._.7 Bid Acknowledgement Form D.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) ADDENDUM #3 ATTACHMENT #2 PAGE 1OF6 Addendum No. Addendum Date Signature Acknowledging Receipt 3 11/23/16 711,---7/4.--- ARTICLE 3 — BIDDER'S REPRESENTATIONS 3.01 The Bidder has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. 3.02 The Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. 3.03 The Bidder is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work. 3.04 The Bidder has carefully studied the following Site -related reports and drawings as identified in the Supplementary Conditions: A. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; B. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; C. Underground Facilities referenced in reports and drawings; D. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and E. Technical Data related to each of these reports and drawings. 3.05 The Bidder has considered the: A. Information known to Bidder; B. Information commonly known to contractors doing business in the locality of the Site; C. Information and observations obtained from visits to the Site; and D. The Contract Documents. 3.06 The Bidder has considered the items identified in Paragraphs 3.04 and 3.05 with respect to the effect of such information, observations, and documents on: A. The cost, progress, and performance of the Work; B. The means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and C. Bidder's safety precautions and programs. 3.07 Based on the information and observations referred to in the preceding paragraphs, Bidder agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. Bid Acknowledgement Form ADDENDUM #3 Q.N. Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT #2 Phase 1(Project No. E16246) PAGE 2 OF 6 3.08 The Bidder is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. 3.09 The Bidder has correlated the information known to the Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. 3.10 The Bidder has given the OAR written notice of all conflicts, errors, ambiguities, or discrepancies that the Bidder has discovered in the Contract Documents, and the written resolution provided by the OAR is acceptable to the Bidder. 3.11 The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 3.12 Bidder's entry into this Contract constitutes an incontrovertible representation by Bidder that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. ARTICLE 4 — BASIS OF BID 4.01 Bidder will complete the Work in accordance with the Contract Documents at the unit prices shown in the BID FORM. A. Extended amounts have been computed in accordance with Paragraph 13.03 of the General Conditions. B. Bidder acknowledges that the estimated quantities are not guaranteed, and final payment for all Unit Price items will be based on actual quantities provided, measured as provided in the Contract Documents. C. Unit Price and figures column will be used to compute the actual Bid price. ARTICLE 5 — EVALUATION OF BIDDERS 5.01 The contract may be awarded either to the lowest responsible bidder or to the bidder who provides the best value for the Owner. The Owner will consider the amount bid, the Bidder's responsibility, the Bidder's safety record, the Bidder's indebtedness to Owner and whether the Bidder has rnet the minimum specific project experience requirements to determine the lowest responsible Bidder. The Owner reserves the right to waive any and all irregularities in determining the Bidders' responsibility or value, and whether the Bidder has met the minimum specific project experience requirements, and reserves the right to require the submission of additional information. 5.02 The Owner has the right to accept a Bid, reject any and all Bids, to waive any and all irregularities in the Bids, or to reject non -conforming, non-responsive or conditional Bids. In addition, the Owner reserves the right to reject any Bid where circumstances and developments have, in the opinion of the Owner, changed the responsibility of the Bidder. 5.03 Material misstatements in the documentation submitted to determine the Bidder's responsibility, including information submitted per SECTION 00 45 16 STATEMENT OF Bid Acknowledgement Form O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1(Project No. E15246) ADDENDUM #3 ATTACHMENT #2 PAGE 3 OF 6 EXPERIENCE, may be grounds for rejection of the Bidder's Bid on this Project. Any such misstatement, if discovered after award of the Contract to such Bidder, may be grounds for immediate termination of the Contract, Additionally, the Bidder will be liable to the Owner for any additional costs or damages to the Owner resulting from such misstatements, including costs and attorney's fees for collecting such costs and damages. ARTICLE 6—TIME OF COMPLETION 6.01 Bidder will complete the Work required to be substantially completed within 365 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions. Bidder will complete the Work required for final payment in accordance with Paragraph 15.06 of the General Conditions within 395 days after the date when the Contract Times commence to run. 6.02 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within the number of days indicated. ARTICLE 7 —ATTACHMENTS TO THIS BID In compliance with the Bid Requirements in SECTION 00 21 13 INVITATION TO BID AND INSTRUCTIONS TO BIDDERS, the following are made a condition of this Bid: A. Bid Security. B. SECTION 00 30 00 BID ACKNOWLEDGEMENT FORM and documentation of signatory authority. C. SECTION 00 30 01 BID FORM. D. SECTION 00 30 02 COMPLIANCE TO STATE LAW ON NONRESIDENT BIDDERS. E. SECTION 00 30 05 DISCLOSURE OF INTEREST. F. SECTION 00 30 06 NON -COLLUSION CERTIFICATION. G. SECTION 00 45 16 STATEMENT OF EXPERIENCE ARTICLE 8 — DEFINED TERMS 8.01 The terms used in this Bid have the meanings indicated in the General Conditions and the Supplementary Conditions. The significance of terms with initial capital letters is described in the General Conditions. ARTICLE 9 — VENUE 9.01 Bidder agrees that venue shall lie exclusively in Nueces County, Texas for any legal action. ARTICLE 10 — SIGNATORY REQUIREMENTS FOR BIDDERS 10.01 Bidders must include their correct legal name, state of residency, and federal tax identification number in the Bid Form. Bid Acknowledgement Form O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1(Project No. E16246) ADDENDUM #3 ATTACHMENT #2 PAGE 4 OF 6 10.02 The Bidder, or the Bidder's authorized representative, shall sign and date the Bid Form to accompany all materials included in the submitted Bid. Bids which are not signed and dated in this manner, or which do not contain the required documentation of signatory authority may be rejected as non-responsive. The individual(s) signing the Bid must have the authority to bind the Bidder to a contract, and if required, shall attach documentation of signatory authority to the Bid Form. 10.03 Bidders who are individuals ("natural persons" as defined by the Texas Business Organizations Code §1.002), but who will not be signing the Bid Form personally, shall include in their bid a notarized power of attorney authorizing the individual designated as their authorized representative to submit the Bid and to sign on behalf of the Bidder. 10.04 Bidders that are entities who are not individuals shall identify in their Bid their charter or Certificate of Authority number issued by the Texas Secretary of State and shall submit with their Bid a copy of a resolution or other documentation approved by the Bidder's governing body authorizing the submission of the Bid and designating the individual(s) authorized to execute documents on behalf of the Bidder. Bidders using an assumed name (an "alias") shall submit a copy of the Certificate of Assumed Name or similar document. 10.05 Bidders that are not residents of the State of Texas must document their legal authority to conduct business in Texas. Nonresident Bidders that have previously registered with the Texas Secretary of State may submit a copy of their Certificate of Authority. Nonresident Bidders that have not previously registered with the Texas Secretary of State shall submit a copy of the Bidder's enabling documents as filed with the state of residency, or as otherwise existing. Bid Acknowledgement Form O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) ADDENDUM #3 ATTACHMENT #2 PAGE 5 OF 6 ARTICLE 11— BID SUBMITTAL 11.01 This Bid is submitted by: Bidder: American Process Group Inc. By: (typed or printed full legal name of Bidder) (individuar s signature) Name: John Prince Title: President Attest: (typed ar printed) (typed ar printed) (individual's signature) State of Residency: Washington Federal Tax Id. No. 98-0445155 Address for giving notices: 1201 Pacific Ave., Suite 600 Tacoma, WA 98402 Phone: (780) 963-1484 Email: jprince@amprocessgroup.com (Attach evidence of authority to sign if the authorized individual is not the Bidder, but an individual signing on behalf of another individual Bidder, or if the authorized individual is a representative of a corporation, partnership, or joint venture.) END OF SECTION Bid Acknowledgement Form ADDENDUM #3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal ATTACHMENT#2 Phase 1 (Project No. E16246) PAGE 6 OF 6 00 30 02 COMPLIANCE TO STATE LAW ON NONRESIDENT BIDDERS Chapter 2252 of the Texas Government Code applies to the award of government contract to nonresident bidders. This law provides that: "a government entity may not award a governmental contract to a nonresident bidder unless the nonresident underbids the lower bid submitted by a responsible resident bidder by an amount that is not less than the amount by which a resident bidder would be required to underbid the nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located." "Nonresident bidder" refers to a person who is not a resident of Texas. "Resident bidder" refers to a person whose principal place of business is in this state, including a contractor whose ultimate parent company or majority owner has its principal place of business in this state. Check the statement that is correct for Bidder. ▪ Bidder qualifies as a nonresident bidder whose principal place of business or residency is in the State of Washington D Bidder (includes parent company or majority owner) qualifies as a resident bidder whose principal place of business is in the State of Texas. The Owner will use the information provided in the State of Texas Comptroller's annual publication of other states' laws on contracts to evaluate the Bids of nonresident Bidders. Bidder: Company Name: American Process Group Inc. By: (signature -- attach evidence of authority to sign) Name: John Prince Title: Business address: Phone: (typed or printed) (typed or printed) President 1201 Pacific Ave., Suite 600 Tacoma, WA 98402 (780) 963-1484 Email: jprince@amprocessgroup.com END OF SECTION Compliance to State Law on Nonresident Bidders 00 30 02 -1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E15246) 11-25-2013 00 30 06 NON -COLLUSION CERTIFICATION STATE OF TEXAS COUNTY OF NUECES OWNER: City of Corpus Christi, Texas 1201 Leopard Street Corpus Christi, Texas 78401 CONTRACT: O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 Project No. E16246 Bidder certifies that the it has not been a party to any collusion among Bidders in the restraint of freedom of competition by agreement to submit a Bid ata fixed price or to refrain from bidding; or with any official or employee of the Owner as to quantity, quality, or price in the prospective contract, or any other terms of said prospective contract; or in any discussion between Bidders and any official of the Owner concerning exchange of money or other thing of value for special consideration in the letting of a contract. Company Name: American Process Group Inc. By: Name: John Prince (typed or printed) (signature -- attach evidence of authority to sign) (typed or printed) Title: President Business address: 1201 Pacific Ave., Suite 600 Phone: Tacoma, WA 98402 (780) 963-1484 Email: jprince@amprocessgroup.com END OF SECTION Non -Collusion Certification 00 30 06 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 11-25-2013 CIVCAST Report Created On: 11/30/2016 2:39:17 PM PROJECT: E16246 ONSWTF Intermediate Sludge Removal Fhasel BIDDER: American Process Group TOTAL BID: $2,310,756.49 COMPLETION TIME: Not Required BIDDER INFO: 1201 Pacific Ave. 4500 Tacoma,WA 98402 P: 866-960-1480 F: 780-963-1482 CIVCAST Report Created On: 11/30/2016 2:39:17 PM BID FORM BASE BID Total PART A - RENEWABLE (per SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) $2,310,756.49 Total $2,310,756.49 Base Bid PART A - RENEWABLE (par SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) No. Description Unit Qty Unit Price Ext Price Al Mobilization, Not to Exceed 7.5% of total Bid, Complete in Place per Lump Sum. LS 1 $173,897.93 $173,897.93 A2 Dredge, Dewater and Haul residuals from Lagoon #7 including all work and materials considered subsidiary to this bid item (subsidiary items include but are not limited to; fumishing dredge equipment, furnish and install turbidity protection for washwater return pump station, furnish and install dewatering equipment, polymer injection equipment, residual and polymer containment areas as required, filtrate retum provisions, trucks, fuel. truck maintenance, maintenance of access, electrical feed for dewatering equipment, permits, licenses and certifications as required, and residual analytical testing) as per specification, Complete in Place per Dry Ton. DT 10000 $178.78 $1,787,800.00 A3 Remove cattails and other aquatic vegetation from Lagoon #7. as necessary to perform the required dredging, Complete in Place per Lump Sum. LS 1 $349,058.56 $349,058.56 Sub Total: $2,310,756.49 Table 1— Organization Information Organization doing business as: American Process Group Inc. Business Address of Principal Office 1201 Pacific Ave., Suite 600 Tacoma, WA 98402 Telephone No. (780) 963-1484 Website www.amprocessgroup.com Form of Business (check one) K Corporation ❑ Partnership ❑ Individual If a Corporation State of Incorporation Deleware Date of Incorporation October 26, 2004 Chief Executive Officer's Name N/A President's Name John Prince Vice President's Names) Colleen Prince Secretary's Name Colleen Prince Treasurer's Name Colleen Prince If a Partnership Date of Organization Form of Partnership: ■ General • Limited If an Individual Name Ownership of Organization List of companies, firms, or organizations that own any part of the organization. Names of Companies, Firms, or Organizations Percent Ownership American Process Holdings Ltd. 100% Organization History List of names that this organizatio currently, has, or anticipates operating under including the names of related companies presently doing business. Names of Organizations From Date To Date N/A Indicators of Organization Size Average number of current full-time employees 8 Average estimate of revenue for the current year $8,000,000.00 Statement of Experience 0.N. Stevens Water Treatment Plant intermediate Sludge Removal Phase 1 (Project No. E16246) 004516-5 Rev 06-22-2016 Table 1— Organization Information Organization doing business as: American Process Group Inc. Previous History with City of Corpus Christi List the 5 most recent projects that have been completed with the City of Corpus Christi. Project Name Year 1 None 2 3 4 5 Construction Site Safety Experience Provide Bidders Experience Modification Ratio (EMR) History for the last 3 years. Provide documentation of the EMR. *** Please refer to our proposal for previous year EMR information. Year 2016 EMR 1.0 Year EMR Year EMR Previous Bidding and Construction Experience Has Bidder or a predecessor organization been disqualified as a bidder within the last 10 years? List Projects below and provide full details in a separate attachment if yes. No Has Bidder or a predecessor organization been released from a bid or proposal in the past 10 years? List Projects below and provide full details in a separate attachment if yes. No Has Bidder or a predecessor organization ever defaulted on a project or failed to complete any work awarded to it? List Projects below and provide full details in a separate attachment if yes. No Has Bidder or a predecessor organization been involved in claims or litigation involving project owners within the last 10 years? List Projects below and provide full details in a separate attachment if yes. No Have liens or claims for outstanding unpaid invoices been filed against the Bidder for services or materials on any projects begun within the preceding 3 years? Specify the name and address of the party holding the lien or making the claim, the amount and basis for the lien orclaim, and an explanation of why the hen has not been released or that the claim has not been paid if yes. No Statement of Experience O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1(Project No. E16246) 004516-6 Rev 06-22-2016 Table 2 — Project Information Organization doing business as: American Process Group Inc. Proposed Project Organization Provide a brief description of the organizational structure proposed for this project indicating the names and functional roles of proposed key personnel and alternates. Provide resumes for Project Manager, Superintendent, Safety Manager and Quality Control Manager. Position Primary Alternate Project Manager Warren Prince Kurt Ranger Superintendent Mark Siegfried Gregg Pruitt Safety Manager Warren Prince Kurt Ranger Quality Control Manager Mark Siegfried Gregg Pruitt Division of work between Bidder and Proposed Subcontractor and Suppliers Provide a list of Work to be self -performed by the Bidder and the Work contracted to Subcontractors and Suppliers for more than 10 percent of the Work (based on estimated subcontract or purchase order amounts and the Contract Price). Description of Work Name of Entity Performing the Work Estimated Percentage of Contract Price Lagoon dredging & dewatering American Process Group Inc. 57% Sludge hauling Rafter P Transportation 20% Polymer (supplier) Solenis 11% Cat tail removal R & R Petro Services Inc 12% Subcontractor Construction Site Safety Experience Provide Experience Modification Ratio (EMR) History for the last 3 years for Subcontractors that will provide Work valued at 25% or more of the Contract Price. Provide documentation of the EMR. Subcontractor Rafter P Transportation Year 2016 EMR 1.62 Year 2015 EMR 1.37 Year 2014 EMR 1.38 Subcontractor R & R Petro Services Inc Year 2016 EMR 0.94 Year 2015 EMR 0.93 Year 2014 EMR 0.95 Statement of Experience D.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1(Project No. E16246) 004516-7 Rev 06-22-2016 Table 3 — Projects Awarded during the Last 5 Years Organization doing business as: American Process Group Inc. Project Information Project Name Lowville WWTP lagoon biosolids dredge, dewater and hauling to landfill Description Removal of 3500 DT with an increase to remove an additional 300 DT daily production average of 109 DT Reference Contact Information Project Owner Village of Lowville, NY Name/Title Tom Campo / Superintendent of Public Works Telephone (315) 376-2834 Email tcompo@centralny.twcbc.com Project Designer GYMO Engineering Project Budget and Performance Original Contract Price $1,147,181.00 Final Contract Price $1,334,136.00 # Contract Days 35 # Days Late 0 Issues/Claims/ Litigation: None Project Information Project Name Marysville WWF lagoon biosolids dredge,dewater, haul and land application Description Contract was to remove up to 8183 DT, total removal of 8166 DT, with a daily production average of 131 DT Reference Contact Information Project Owner City of Marysville, WA Name/Title Adam Benton / Project Manager Telephone 360-636-8283 Email abenton@marysvillewa.gov Project Designer N/A Project Budget and Performance Original Contract Price $4,016,910.00 Final Contract Price $4,005,904.00 # Contract Days 62 # Days Late 0 Issues/Claims/ Litigation: None Project Information Project Name Ward WWTP lagoon alum sludge dredge ,dewater, hauling at compost site Description Contract was to remove up to 2400 DT, total removal of 2315 DT, with a daily production average of 75 DT Reference Contact Information Project Owner City of High Point, NC Name/Title Geoff Beane/ Chief Operator Ward Plant Telephone (336) 883-3430 Email Project Designer N/A Project Budget and Performance Original Contract Price $1,086,486.00 Final Contract Price $1,116,120.00 # Contract Days 30 # Days Late 0 Issues/Claims/ Litigation: Statement of Experience O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 004516-8 Rev 06-22-2016 Table 3 — Projects Awarded during the Last 5 Years — Not including City of Corpus Christi Projects Organization doing business as: American Process Group Inc. Project Information Project Name Hefner WTP lagoon lime sludge dredge, dewater and hauling for beneficialreuse Description Removal of 16,000DT with an increase to remove an additional 300 DT daily production average of 187 DT Reference Contact Information Project Owner Oklahoma City Name/Title Steve Krausnick Telephone (405) 297-2746 Email Project Designer N/A Project Budget and Performance Original Contract Price $1,468,191.00 Final Contract Price $1,485,525.00 # Contract Days 87 # Days Late 0 Issues/Claims/ Litigation: Proiect Information Project Name Draper WTP & Hefner WTP lagoons lime sludge excavate, dredge, dewater and haul Description Contract was to remove 46,000 DT between both WTP. Tonnage was increased. A total of 61,371 DT was removed. Reference Contact Information Project Owner Oklahoma City Name/Title Steve Krausnick Telephone (405) 297.2746 Email 1 Project Designer N/A Project Budget and Performance Original Contract Price Final Contract Price # Contract Days # Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Contract Price Final Contract Price # Contract Days # Days Late Issues/Claims/ Litigation: Statement of Experience O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 004516-9 Rev 06-22-2016 Table 3 — Projects Awarded during the Last 5 Years -- Not including City of Corpus Christi Projects Organization doing business as: American Process Group Inc. Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Contract Price Final Contract Price # Contract Days # Days Late Issues/Claims/ Litigation: Proiect Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Contract Price Final Contract Price # Contract Days # Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Contract Price Final Contract Price # Contract Days # Days Late Issues/Claims/ Litigation: Statement of Experience O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 00 45 16 - 10 Rev 06-22-2016 Table 4 -- Safety Record Questionnaire and Statement of Bidder's Safety Experience Organization doing business as: American Process Group Inc. Bidder's Safety Record and Experience Has the Bidder received any Citations for violations of OSHA within the past five (5) years? List Citations below (date and location of Citation) and provide full details in a separate attachment if yes. The full details must include the type of violation or offense, the final disposition of the violation or offense, if any, and the penalty assessed. No Has the Bidder received any Citations for violations of environmental protection laws or regulations within the past five (5) years? List Citations below (date and location of Citation) and provide full details in a separate attachment if yes. The full details must include the type of violation or offense, the final disposition of the violation or offense, if any, and the penalty assessed. No Has the Bidder, within the past ten (10) years, been convicted of a criminal offense or been subject to a judgment for a negligent act or omission, which resulted in serious bodily injury or death? List convictions or judgments below and provide full details in a separate attachment if yes. No The Owner will consider the following information as additional support to make a determination as to the responsibility of the Bidder. The Bidder must answer the following questions and provide evidence that it meets minimum OSHA construction safety standards and has a lost time injury rate that does not exceed the limits established below: 1 Does the Bidder have a written construction safety program? a Yes ❑ No 2 Does the Bidder conduct regular construction site safety inspections? )3 Yes ❑ No 3 Does the Bidder have an active construction safety training program? Ex Yes o No 4 Does the Bidder, or affected subcontractor, have competent persons in the following areas (as applicable to the scope of the current Project): A. Scaffolding ❑ Yes ❑ No m N/A B. Excavation ❑ Yes ❑ No m N/A C. Cranes & Hoists Ex Yes ❑ No ❑ N/A D. Electrical % Yes ❑ No ❑ N/A Statement of Experience 0.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 00 45 16-11 Rev 06-22-2016 Table 4 — Safety Record Questionnaire and Statement of Bidder's Safety Experience Continued Organization doing business as: American Process Group inc. E. Fall Protection 0 Yes ❑ No ai N/A F. Confined Spaces o Yes o No IN N/A G. Material Hand ling x Yes ❑ No o N/A H. Demolition ❑ Yes ❑ No 0( N/A I. Steel Erection ❑ Yes ❑ No cx N/A J. Underground Construction ❑ Yes ❑ No m N/A 5 Does the Bidder have a lost time injury rate and a total recordable injury rate of less than or equal to the national average for North American Industrial Classification System ("NAICS") Category 23 for each of the past five (5) years? Provide the Bidder's OSHA 300 and 300A logs for the past five (5) years in a separate attachment. i Yes ❑ No 6 Does the Bidder have an experience modifier rate of 1.0 or less? Provide the Bidder's NCCI workers' compensation experience rating sheets for the past five (5) years in a separate attachment. IN Yes ❑ No 7 Has the Bidder had any OSHA inspections within the past six (6) months? Provide documentation showing the nature of the inspection, the findings, and the magnitude of the issues in a separate attachment if yes. m Yes ❑ No Statement of Experience 00 45 16 - 12 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1(Project No. E16246) Rev 06-22-2016 Table 5 — Demonstrated Minority, MBE, DBE Participation Organization doing business as American Process Group Inc. Project Subcontractors and Suppliers Provide a list of anticipated Minority, MBE, DBE Subcontractors or Suppliers contracts that will be used to demonstrate compliance with the Owner's Minority / MBE / DBE Participation Policy Name Work to be Provided Estimated % of Contract Price None Statement of Experience 00 45 16 - 13 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev 06-22-2016 ARTICLE 5 — CERTIFICATION 6.01 By submitting this Statement of Experience and related information, Bidder certifies that it has read this Statement of Experience and that Bidder's responses are true and correct and contain no material misrepresentations and that the individual signing below is authorized to make this certification on behalf of the Bidder's organization. The individual signing this certification shall attach evidence of individual's authority to bind the organization to an agreement. Bidder: By: Name: Title: American Process Group Inc. John Prince (typed or printed) (individual's signature) (typed or printed) President {typed or printed) Designated Representative: Name: Title: Address: John Prince President 1201 Pacific Ave., Suite 600 Tacoma, WA 98402 Telephone No.: (780) 963-1484 Email: jprince@amprocessgroup.com END OF SECTION Statement of Experience 00 45 16 - 14 0.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1(Project No. E16246) Rev 06-22-2016 00 30 01 BID FORM Project Name: O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 Project Number: E16246 Owner: City of Corpus Christi Bidder: American Process Group Inc. OAR: TBD Designer: LNV, Inc. Basis of Bid Item DESCRIPTION UNIT QUANTITY (Bid Evaluation ONLY - NOT FOR AWARD) UNIT PRICE EXTENDED AMOUNT Base Bid PART A - GENERAL (per SECTION 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT) Al Mobilization, Not to Exceed 7.5% of total Bid, LS 1 $173,897.93 $173,897.93 Complete in Place per Lump Sum. A2 Dredge, Dewater and Haul residuals from Lagoon #7 including all work and materials considered subsidiary to this bid item (subsidiary items include but are not limited to; furnishing dredge equipment, furnish and install turbidity protection for washwater return pump station, furnish and install dewatering equipment, polymer injection equipment, residual and polymer containment areas as required, filtrate return provisions, trucks, fuel, truck maintenance, maintenance of access, electrical feed for dewatering equipment, permits, licenses and certifications as required, and residual analytical testing) as per specification, Complete in Place per Dry Ton. DT 10,000 $178.78 $1,787,800.00 A3 Remove cattails and other aquatic vegetation from Lagoon #7, as necessary to perform the required dredging, Complete in Place per Lump Sum. LS 1 $349,058.56 $349,058.56 SUBTOTAL PART A - GENERAL (Items Al thru A3) TOTAL EXTENDED AMOUNT FOR ITEM A2 IS FOR BID EVALUATION PURPOSES ONLY $2,310,755.49 Bid Form O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (E16246) ADDENDUM #3 ATTACHMENT #3 Page 1 of 2 00 30 01 BID FORM BID SUMMARY SUBTOTAL PART A - GENERAL (Items Al thru A3) TOTAL PROJECT BASE BID (PART A) Contract Times 1 2,310,756.49 1 2,310,756.49 Bidder agrees to reach Substantial Completion in 365 days Bidder agrees to reach Final Completion in 395 days Bid Form O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (E16246) ADDENDUM #3 ATTACHMENT #3 Page 2 of 2 ittiE GUARANTEE CONTRACTOR: (Name, legal status and address) American Process Group Inc. THE GUARANTEE COMPANY OF NORTH AMERICA USA One Towne Square, Suite 1470 Southfield, Michigan 48076 Phone: 248-281-0281 Fax: 248-750-0431 www.gena.cam 1201 Pacific Ave Suite 600 Tacoma, WA 98402 OWNER: (Name, legal status and address) City of Corpus Christi Texas 1201 Leopard Street Corpus Christi, TX 78401 BOND AMOUNT: .5% of Tender Price PROJECT: (Name, location or address and Project number, if any) O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Bid Bond Bid Bond ES8021938-905 SURETY: (Name, legal status and principal place of business) The Guarantee Company of North America USA One Towne Square, Suite 1470 Southfield, Michigan 48076 This document has important legal consequences. Consultation with an attorney is encouraged with respect to its completion or modification. Any singular reference to Contractor, Surety, Owner or other party shall be considered plural where applicable. The Contractor and Surety are bound to the Owner in the amount set forth above, for the payment of which the Contractor and Surety bind themselves, their heirs, executors, administrators, successors and assigns, jointly and severally, as provided herein. The conditions of this Bond are such that if the Owner accepts the bid of the Contractor within the time specified in the bid documents, or within such time period as may be agreed to by the Owner and Contractor, and the Contractor either (1) enters into a contract with the Owner in accordance with the terms of such bid, and gives such bond or bonds as may be specified in the bidding or Contract Documents, with a surety admitted In the jurisdiction of the Project and otherwise acceptable to the Owner, for the faithful performance of such Contract and for the prompt payment of labor and material furnished in the prosecution thereof; or (2) pays to the Owner the difference, not to exceed the amount of this Bond, between the amount specified in said bid and such larger amount for which the Owner may in good faith contract with another party to perform the work covered by said bid, then this obligation shall be null and void, otherwise to remain in full force and effect. The Surety hereby waives any notice of an agreement between the Owner and Contractor to extend the time in which the Owner may accept the bid. Waiver of notice by the Surety shall not appiy to any extension exceeding sixty (60) days in the aggregate beyond the time for acceptance of bids specified in the bid documents, and the Owner and Contractor shall obtain the Surety's consent for an extension beyond sixty (60) days. if this Bond is issued in connection with a subcontractor's bid to a Contractor, the term Contractor in this Bond shall be deemed to be Subcontractor and the term Owner shall be deemed to be Contractor. When this Bond has been furnished to comply with a statutory or other legal requirement in the location of the Project, any provision in this Bond conflicting with said statutory or legal requirement shall be deemed deleted herefrom and provisions conforming to such statutory or other legal requirement shall be deemed incorporated herein_ When so furnished, the intent is that this Bond shall be construed as a statutory bond and not as a common law bond. Signed and sealed this 23rd Kim Wiggins day of November 2016 (Witness) (Witness) American Process Group Inc. [Principal (Seal) C.PLikA,k—tjkVAC. T{L� r (Title) The Guarantee Company of North America USA (Surety) Theresa Hedberg, Attorney -in -Fact (Title), (Seal) The language in thls document conforms exactly to the language used in AIR Document A310 — Bid Bond 2010 edition. GUARANTEE® The Guarantee Company of North America USA Southfield, Michigan POWER OF ATTORNEY NOW ALL BY THESE PRESENTS: That THE GUARANTEE COMPANY OF NORTH AMERICA USA, a corporation organized and existing under the laws of the State of Michigan, having its principal office in Southfield, Michigan, does hereby constitute and appoint Alex Campbell, Graham McIntosh, Irene LeBlanc, Theresa Hedberg, Dina Amaro -Elias, Richard Longiand, Paul Hollingworth, Yves Boilard, Benoit Phenix, Nathalie Sanscartier, Cheryl Best -Pope, Oiga lankine, Dan Fletcher, Michel Bourque, Max Fratarcangeli, Francois Forget, Steve Rees, Nelson de Quintal, Pamela Martin, Sean Deakin, Dana Hammond, Chelsea Fish, Richard Gray, Greg Forsythe, Jody Maillet, Korey Pettit, Stephen Jensen, Maryse Bertrand, Kim Roberts The Guarantee Company of North America its true and lawful attorney(s)-in-fact to execute, seal and deliver for and on its behalf as surety, any and al] bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof, which are ormay be allowed, required or permitted by law, statute, rule, regulation, contract or otherwise, The execution of such instruments) in pursuance of these presents, shall be as binding upon THE GUARANTEE COMPANY OF NORTH AMERICA USA as fully and amply, to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at the principal office. The Power of Attorney is executed and may be certified so, and may be revoked, pursuant to and by authority of Article IX, Section 9.03 of the By -Laws adopted by the Board of Directors of THE GUARANTEE COMPANY OF NORTH AMERICA USA at a meeting held on the 31a day of December, 2003. The President, or any Vice President, acting with any Secretary or Assistant Secretary, shall have power and authority: 1. To appoint Attorney(s)-in-fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the Company thereto, bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof; and 2. To revoke, at anytime, any such Attomey-in-fact and revoke the authority given, except as provided below 3. In connection with obligations in favor of the Florida Department of Transportation only, It is agreed that the power and authority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages andlorfinal estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. 4. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner — Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. Further, this Power of Attorney is signed and sealed by facsimile pursuant to resolution of the Board of Directors of the Company adopted at a meeting duly called and held on the 6th day of December 2011, of which the following is a true excerpt: RESOLVED that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any Power of Attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, contracts of indemnity and other writings obligatory in the nature thereof, and such signature and seal when so used shall have the same force and effect as though manually affixed. IN WITNESS WHEREOF, THE GUARANTEE COMPANY OF NORTH AMERICA USA has caused this instrument to be signed and its corporate seal to be affixed by its authorized officer, this 2"d day of October, 2015, STATE OF MICHIGAN County of Oakland THE GUARANTEE COMPANY OF NORTH AMERICA USA Stephen C. Ruschak, President & Chief Operating Officer Randall Musselman, Secretary On this 2nd day of October, 2015 before me came the individuals who executed the preceding instrument, to me personally known, and being by me duly sworn, said that each is the herein described and authorized officer of The Guarantee Company of North America USA; that the seal affixed to said instrument is the Corporate Seal of said Company; that the Corporate Seal and each signature were duly affixed by order of the Board of Directors of said Cynthia A. Takef Notary Public, State of Michigan County of Oakland My Commission Expires February 27 2018 Acting in Oakland County IN WITNESS WHEREOF, I have hereunto set my hand at The Guarantee Company of North America USA offices the day and year above written. ,tAftt.a, a. Tom; 1, Randall Musselman, Secretary of THE GUARANTEE COMPANY OF NORTH AMERICA USA, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney executed by THE GUARANTEE COMPANY OF NORTH AMERICA USA, which is still in full force and effect. IN WITNESS WHEREOF, I have thereunto set my hand and attached the seal of said Company this 23 day of November, 2016 Randall Musselman, Secretary RESPONSIBILITIES KURT RANGER Operations Manager CURRICULUM VITAE Kurt joined American Process Group (APG) in April of 2010 and is one of APG's Operations Managers. In this position, he is responsible for overseeing all operational aspects on the projects he is assigned to. He has experience in following through with projects from initial bid development, contract execution, and post project client relations. His role includes assisting in the development of project estimates and budgets for customers on public and private tenders for dredging and dewatering opportunities using centrifuge technology; developing technical scope of work criteria with customers and clients and building project estimates and proposals tailored to their specific challenges; overseeing the project managers running of projects, to ensure budgetary and production targets are met, managing clients concerns and expectations, and reporting progress to upper management and acting as customer liaison. Kurt also holds a 4th Class Power Engineer ticket. Kurt's equipment prowess is very strong and his ability to communicate and direct APG's field Project Managers is exemplary. Prior to taking on the role as Operations Manager, Kurt worked with APG part time on various projects throughout 2009. EDUCATION • 4th Class Power Engineer ticket & TRAINING • H2S Alive • WHMIS/TDG • Fall Protection / Fall Arrest • Leadership for Safety Excellence • CSTS PROJECT American Process Group (2010 — Present) EXPERIENCE Operations Manager r Review of project daily field operations project reporting, productivity and costs Management of Project Managers i.e.: daily reports, training, human resources, etc. r Coordinate timely equipment preventative maintenance with personnel r Effective coordination of equipment mobilization/demobilization, and personnel scheduling for multiple projects Provide leadership and direction to field project managers r Provide project manager relief or assistance in the field when required r Administration of APG safety program in consultation with executive management r Ensure operations are following defined safety policies Ensure proper safety documentation is being completed and filed according to policy Maintain currency of knowledge of relevant safety legislation, through courses and training. www.a m processgrou p.com KURT RANGER Operations Manager • Operations Management experience includes: o PCL-EPCOR Channel 3 & Grit Tank 7 Cleaning - Edmonton AB 2016 o Shepard Lagoon Facility Lagoon Cleaning - Calgary AB 2016 o Shepard Lagoon Facility Lagoon Cleaning - Calgary AB 2015 o Grande Cache Lagoon Cleaning - Grande Cache AB 2014 o Sherritt Metals Lime Pond Cleaning - Ft. Saskatchewan AB 2014 o Shepard Lagoon Facility Lagoon Cleaning - Calgary AB 2014 o Weyerhaeuser Pulp Mill Lagoon Cleaning - Grande Prairie AB 2014 o Suncor Lime Pond Sludge Removal - Edmonton AB 2014 o Glacial Snow Melt Ponds Cleaning - Edmonton AB 2014 o Sand Recycling Online Dewatering Services - Edmonton AB 2014 o Nova Chemical Pond Lime & Phosphate Removal - Joffre AB 2014 o Vernonia Lagoon Cleaning - Vernonia OR 2014 o James WWTP Digester Cleaning - Abbotsford BC 2014 o EPCOR Goldbar Grit Tanks Cleaning - Edmonton AB 2014 o EPCOR Goldbar Digester Cleaning - Edmonton AB 2014 o Point Loma Digesters Cleaning - San Diego CA 2013-2014 o Hefner WTP Lagoon Sludge Removal - Oklahoma OK 2014 o Waterloo WWTP Interim Dewatering - Waterloo, ON 2009-2012 o Trinity River Authority Digester cleaning - Dallas TX 2013-2014 o Sherritt Metals Lime Pond Cleaning - Ft. Saskatchewan AB 2013 o Husky Lime Pond Cleaning - Lloydminister AB 2013 o Weyerhaeuser Pulp Mill Lagoon Cleaning - Grande Prairie AB 2013 o Teck Metals Lagoon Dredging - Trail BC 2013 o MBC Digester Clenaing - San Diego CA 2013 o Cloverbar Lagoon Cleaning - Edmonton AB 2013 o Shepard Lagoon Facility Lagoon Cleaning - Calgary AB 2013 o Port Madison Const. Lagoon Cleaning - Indian Island WA 2013 o Glacial Snow Melt Ponds Cleaning - Edmonton AB 2013 o Everett WPCF Lagoon Biosolids Removal - Everett, WA 2013 o Nova Chemical Pond Lime & Phosphate Removal - Joffre AB 2013 o Sand Recycling Online Dewatering Services - Edmonton AB 2013 o EPCOR Goldbar Grit Tank Cleaning - Edmonton AB 2013 o Longview Fibre Pulp Mill Lagoon Cleaning - Longview WA 2013 o Regina WWTP Lagoons Sludge Removal - Regina SK 2012-1013 o Synagro / Passaic VAC Emergency Dewatering - Newark, NJ 2012 o Completion Ind. Interim Lagoon Dewatering - Marshfield, WI 2012 o Boise Paper Inc Basin Cleaning - Wallula, WA 2012 o Encina WWA Digester Cleaning - Carlsbad, CA 2012 o Hefner WTP and Draper WTP Lagoons Sludge Removal - Oklahoma City, OK 2012 o James WWTP Digester Cleaning - Abbotsford BC 2012 o Glacial Snow Melt Ponds Cleaning - Edmonton AB 2012 o METTKO Waterloo WWTP Digester Cleaning - Waterloo ON 2012 o EPCOR Goldbar Digester Cleaning - Edmonton AB 2012 o Shepard Lagoon Facility Lagoon Cleaning - Calgary AB 2012 • Sand Recycling Online Dewatering Services - Edmonton AB 2012 KURT RANGER - CURRICULUM VITAE Page 2 KURT RANGER Operations Manager o Resolute Paper Lagoon Sludge Removal - Ft. Frances ON 2012 o Iona Island Digester Cleaning - Richmond BC 2012 o Conoco Phillips SAGD Lime Pond Cleaning - Ft. MacMurray AB 2011 o Weyerhaeuser Pulp Mill Lagoon Cleaning - Grande Prairie AB 2011 o Regina WWTP Lagoons Cleaning - Regina SK - 2011 o Louisville MSD Digester Cleaning - Louisville, KY 2011 o Shepard Lagoon Facility Lagoon Cleaning - Calgary AB 2011 o Lions Gate WWTP Digester Cleaning - Vancouver BC 2011 o Glacial Snow Melt Ponds Cleaning - Edmonton AB 2011 o Sherritt Metals Lime Pond Cleaning - Ft. Saskatchewan AB 2011 o Boise Paper Inc Basin Cleaning - Wallula, WA 2011 o Cranbrook WWTP Lagoon Cleaning - Cranbrook BC 2011 o Abitibi -Bowater Pulp Lagoon Sludge Removal - Ft.Frances ON 2011 o Monmouth Lagoons Cleaning - Monmouth, OR 2011 o Iona Island Digester Cleaning - Richmond BC 2011 o Palo Verde Nuclear Generating Station Lagoon Cleaning - Tonopah, AZ 2011 o Burnaby Lake Rejuvenation Project - Burnaby BC 2010 - 2011 o Shepard Lagoon Facility Lagoon Cleaning - Calgary AB 2010 o Glenmore WTP Basin Pumping - Calgary AB 2010 o Louisville MSD Digester Cleaning - Louisville, KY 2010 o Ward WWTP Alum Lagoon Sludge Removal - High Point NC 2010 o Sherritt Metals Lime Pond Cleaning - Ft. Saskatchewan AB 2010 o ConAgra Foods Lagoon Cleaning - Quincy MI 2010 o Georgia Pacific Toledo LLC WWTP Cell Cleaning- Toledo, OR 2010 o Abitibi -Bowater Pulp Lagoon Sludge Removal - Ft.Frances ON 2010 o Portsmouth/ Lake Kilby WTF Lagoon Cleaning - Suffolk, VA 2010 o Point Loma Digesters Cleaning - San Diego CA 2013-2010 o Iona Island Digesters Cleaning - Richmond BC 2010 o Everett WPCF Lagoon Biosolids Removal - Everett, WA 2010 KURT RANGER - CURRICULUM VITAE Page 3 RESPONSIBILITIES WARREN PRINCE Operations Manager CURRICULUM VITAE Warren is one of American Process Group's (APG) Operations Managers. He has been a member of the American Process Group team since early in 2006. In this position, he is responsible for overseeing all operational aspects on the projects he is assigned to. He has experience in following through with projects from initial bid development, contract execution, and post project client relations. His role includes assisting in the development of project estimates and budgets for customers on public and private tenders for dredging and dewatering opportunities using centrifuge technology; developing technical scope of work criteria with customers and clients and building project estimates and proposals tailored to their specific challenges; overseeing the project managers running of projects, to ensure budgetary and production targets are met, managing clients concerns and expectations, and reporting progress to upper management and acting as customer liaison. From 2013 through 2015, Warren's main role shifted to shop foreman where he oversaw the repairs and maintenance of APG's extensive fleet of residuals management equipment, provided on-site equipment repair and troubleshooting support, in addition to his role as Operations Manager. Prior to taking on the role as Operations Manager in late 2014, Warren was one of APG's Project Managers from 2010 through 2012 where he managed a multitude of projects in all scopes of work that APG has to offer; mechanical dewatering, dredging, pumping, lagoon cleaning and digester cleaning. EDUCATION • Millwright Red Seal Journeyman Certificate 2013-2016 & TRAINING • Confined Space Entry • Standard First Aid/ CPR • H25 Alive • WHMIS/TDG • Fall Protection / Fall Arrest • CSTS PROJECT American Process Group (2014 — Present) EXPERIENCE Operations Manager r Review of project daily field operations project reporting, productivity and costs r Management of Project Managers i.e.: daily reports, training, human resources, etc. r Coordinate timely equipment preventative maintenance with personnel r Effective coordination of equipment mobilization/demobilization, and personnel scheduling for multiple projects r Provide leadership and direction to field project managers Provide project manager relief or assistance in the field when required r Administration of APG safety program in consultation with executive management www.a m processgrou p.com WARREN PRINCE Operations Manager Ensure operations are following defined safety policies Ensure proper safety documentation is being completed and filed according to policy Maintain currency of knowledge of relevant safety legislation, through courses and training. • Operations Management experience includes: o Lowville WWTP Lagoon Sludge Removal - Lowville NY 2016 o Sherritt Metals Lime Pond Cleaning - Ft. Saskatchewan AB 2016 o Everett WPCF Lagoon Biosolids Removal - Everett, WA 2016 o Weyerhaeuser Pulp Mill Lagoon Cleaning - Grande Prairie AB 2016 o Marysville WWF Lagoon Cleaning - Marysville, WA 2016 o Sherritt Metals Lime Pond Cleaning - Ft. Saskatchewan AB 2015 o Townsend WWTP Lagoon Sludge Removal - Greensboro NC 2015 o Glacial Snow Melt Ponds Cleaning - Edmonton AB 2015 o Sand Recycling Online Dewatering Services - Edmonton AB 2015 o Ward WWTP Lagoon Alum Sludge Removal - High Point NC 2015 o West Fraser Pulp Mill Lagoon Cleaning - Hinton AB 2015 o Port Townsend Pulp Basin Cleaning - Port Townsend WA 2015 o SAWS Digester Enhancement Project - Dos Rios TX 2014-2015 o Catalyst Paper Clarifier Dredging - Crofton BC 2014 o Boise Paper Inc Basin Cleaning - Wallula, WA 2014 American Process Group Inc. (2010 - 2012) Project Manager Responsible for safety on site including ensuring all APG safety policies and procedures are followed, adhering to any site specific safety requirements, planning and partaking in all safety related meetings and coordinating and communicating with the safety department. Responsible for coordinating and overseeing all site crew including contractors and any third party vendors. Responsible for cost and production data tracking. Responsible for ensuring all site checks are completed including safety and security check, pre -operational equipment checks and completion of equipment logs. Responsible for liaising with the Operations Manager to ensure work is being carried out according to the scope of work. • Project Management experience includes: o Sand Recycling Online Dewatering Services - Edmonton AB 2012 o Lions Gate WWTP Digester Cleaning - Vancouver BC 2011 o Glacial Snow Melt Ponds Cleaning - Edmonton AB 2011 o Cranbrook WWTP Lagoon Cleaning - Cranbrook BC 2011 o Burnaby Lake Rejuvenation Project - Burnaby BC 2010 - 2011 WARREN PRINCE - CURRICULUM VITAE Page 2 RESPONSIBILITIES MARK SIEGFRIED Project Manager CURRICULUM VITAE Mark is one of American Process Group's (APG) Project Managers. He has been a member of the American Process Group operation's team since early in 2005. He has over 13 years' experience in residuals management in project operations and management. From 2013 through 2015 Mark's main role was APG's Field Safety Advisory to ensure compliance with company, OSHA, and OH&S safety rules and regulations. Prepare site safety plans and emergency response plans. Conduct investigations and file reports for incidents; develop corrective action plans and follow up on implementation of plans. In 2016 Mark returned to his former role as a project manager and now possesses a strong knowledge in safety management. His expertise in the residuals management industry includes overseeing projects in all scopes of work that APG has to offer; mechanical dewatering, dredging, pumping, lagoon cleaning and digester cleaning. He has extensive experience in field work overseeing the mobilization / demobilization and operation of projects, facilitating on-site safety, ensure budgetary and production targets are met, managing clients concerns and expectations, and reporting progress to upper management and acting as customer liaison. EDUCATION • BS Mechanical Engineering - University of Wyoming - May, 1983 & TRAINING • MS Applied Physics University of Washington - March, 1990 • ACSA NCSO training - completion May, 2013 • Standard First Aid/CPR • Confined Space Entry • WHMIS/TDG • Fall Protection / Fall Protection • Telehandler & Rough Terrain Forklift PROJECT American Process Group Inc. (2007 — Present) EXPERIENCE Project Manager Responsible for safety on site including ensuring all APG safety policies and procedures are followed, adhering to any site specific safety requirements, planning and partaking in all safety related meetings and coordinating and communicating with the safety department. r Responsible for coordinating and overseeing all site crew including contractors and any third party vendors. Responsible for cost and production data tracking. r Responsible for ensuring all site checks are completed including safety and security check, pre -operational equipment checks and completion of equipment logs. r Responsible for liaising with the Operations Manager to ensure work is being carried out according to the scope of work. www.a m processgrou p.com MARK SIEGFRIED Project Manager • Project Management experience includes: • Marysville WWF Lagoon Cleaning - Marysville, WA 2016 o Everett WPCF Lagoon Biosolids Removal - Everett, WA 2016 o Hefner WTP and Draper WTP lagoons sludge removal - Oklahoma City, OK 2012 (Draper WTP portion of project) o Encina WWA Digester Cleaning - Carlsbad, CA 2012 o Louisville MSD Digester Cleaning - Louisville, KY 2011 o Palo Verde Nuclear Generating Station Lagoon Cleaning - Tonopah, AZ 2011 o Louisville MSD Digester Cleaning - Louisville, KY 2010 o Portsmouth/ Lake Kilby WTF Lagoon Cleaning - Suffolk, VA 2010 o Everett WPCF Lagoon Biosolids Removal - Everett, WA 2010 o Louisville MSD Digester Cleaning - Louisville, KY 2009 o Gouverneur WWTP Ponds Cleaning - Gouverneur, NY 2009 o Pigeon Forge WWTP Digester Cleaning - Pigeon Forge, TN 2009 o Louisville MSD Digester Cleaning- Louisville, KY 2009 o Longview Fibre Paper Interim Dewatering - Longview WA 2008 o Everett WPCF Lagoon Biosolids Removal - Everett, WA 2008 o Lihue WWTP Digester Cleaning - Lihue, HI 2008 o Northeast APCF digester Cleaning - Clearwater, FL 2008 o Willow Lake WWTP Digester Pumping - Salem, OR 2008 o Santa Paula WWTP Digester Cleaning - Santa Paula, CA 2007 o Hale Ave RRF digester Cleaning - Escondido, CA 2007 o Lake Stevens Sewer District Pond Cleaning - Lake Stevens 2006 MARK SIEGFRIE❑ - CURRICULUM VITAE Page 2 RESPONSIBILITIES GREGG PRUITT Project Manager CURRICULUM VITAE Gregg Pruitt has been with American Process Group Inc. (APG) since its inception in 2004. From 2004 to 2009 Gregg was a one of APG's main centrifuge technicians and shift supervisors. By 2010 he became one of APG's project managers and is an integral part of the team. His expertise in the residuals management industry includes overseeing projects in all scopes of work that APG has to offer; mechanical dewatering, dredging, pumping, lagoon cleaning and digester cleaning. He has extensive experience in field work overseeing the mobilization / demobilization and operation of projects, facilitating on-site safety, ensure budgetary and production targets are met, managing clients concerns and expectations, and reporting progress to upper management and acting as customer liaison. EDUCATION • WHMIS & TRAINING PROJECT American Process Group Inc. (2010 - Present) EXPERIENCE Project Manager • Responsible for safety on site including ensuring all APG safety policies and procedures are followed, adhering to any site specific safety requirements, planning and partaking in all safety related meetings and coordinating and communicating with the safety department. Responsible for coordinating and overseeing all site crew including contractors and any third party vendors. Responsible for cost and production data tracking. Responsible for ensuring all site checks are completed including safety and security check, pre -operational equipment checks and completion of equipment logs. Responsible for liaising with the Operations Manager to ensure work is being carried out according to the scope of work. • Project Management experience includes: o Lowville WWTP Lagoon Sludge Removal - Lowville NY 2016 o Hefner WTP Lagoon Sludge Removal - Oklahoma OK 2014 o Port Madison Const. Lagoon Cleaning - Indian Island WA 2013 o Everett WPCF Lagoon Biosolids Removal - Everett WA 2013 o Boise Paper Inc Basin Cleaning - Wallula, WA 2012 o Completion Ind. Interim Lagoon Dewatering - Marshfield, WI 2012 o Synagro / Passaic VAC Emergency dewatering - Newark, N] 2012 o Hefner WTP and Draper WTP lagoons sludge removal - Oklahoma City, OK 2012 (Hefner WTP portion of project) o Georgia Pacific Toledo LLC WWTP Cell Cleaning- Toledo, OR 2010 www.a m processgrou p.com Liberty Mutual. INSURANCE American Process Group Inc. 946 Boulder Blvd Stony Plain AB T7Z 0E6 Re: NCCI Experience Rating Modifier To Whom It May Concern: 181 Bay Street Brookfield Place Suite 1000 Toronto, Ontario M5J 2T3 Tel: 416-365-7587 Fax: 416-307-4372 November 23, 2016 Please be advised that America Process Group does not yet qualify for experience rating, and have not since 2013, due to their annual premium being below the minimum requirement the past few years. Based on this, their rating is 1.00. Should you have any questions, please do not hesitate to ask. Thank you and Regards, Amy Mehta, ARM, CPCU AVP Workers' Compensation Liberty Mutual Insurance Company Liberty International Underwriters, a Division of the Liberty Mutual Insurance Company. OSHA's Form 300A (Rev. 01,2004) Summary of Work -Related Injuries and Illnesses .40 estetdkhments =wee by Pert 0904 must complete 9101 Surramarypage. even «0o en. 01 iiirrssses occurred dc,Ang dye year Ieamemberlo renew Me Leg M v01Ny that Ilse enrdea are 00094ere Using the tog. CONril Me Individual metes you made /to Sean category. Then mn99 010 mfaa 110 making sure ycwlm added yea earns e-a,r every page of Ma rig. 040200900009016,"" E_mpUyaesrom9N empoyees, and their rsµ fabves hem Me right M reeky, the 00144 F 30010 9001110049. They also neve *need access do Me OSHA 11901 or es aquoolent. See 2.1YR 7094.34 A 0911,111 Iteeordbrmmparg rule. Wr 910149+940400 CO flea aroess4'ovisans 0r then ,Mels. umberotCases Total number of Total number of Total number of cases Total number of deaths cases with days with fab transfer or other recordable away from work restriction oases 0 0 0 (©) (H) (1) (J) iNlanber d1 Days Total number of days away from wn11. 941 Total number of days of Job transfer or rest4cllon 0 d njury and Illness Types Total number of. (M} (1) Irijury 9 (4) Poisoning (2) Skin Disorder 0 (9) Hearing Loss (3) Respiratory Condition 0 (6) All Other Illnesses Post this Summary page from February 1 to April 30 of the year following the year covered by Ma form Punto rep:ring burl n Sat coleclha rn rlumeaon b aelmared m swage 59 000090990094010009900109994929990912009,9119601110 gam lee 099 needed. mei:DRUM and team, the WWI:0 Or ntonalian.rem:neve ettRQue99 k reapor6 tc en aeon 0f9t0011n unless die earandya06d 0913 acid number. If youhoa any ccnura& stout Ibaoa renal &any agedsd&la dataCeletlloq .001194110 Dopenmagof 1267 .0.44. Once dandle. rmmr13e44,2a0 Casn4nn Me.NIY,Nrahmolsa oC 2021a Do 01eename caramel roma toms Oe09. Year 2013 <4, U.S. Department of Labor 00.5.4.1.0.41 11104.2W Henn Admlrearanon vrcn 9Pp'u.e1 CUB so. 12124170 Establishment Information Your establishment name American Process Group Inc. &heel 1201 Pec'dickve 7600 01ey 'Dome 01990 6VA Zip 96402 Indualryda0Yglon (0.9.. Manufacture of motor 1rtdt 91010re) Reedu111 Management Services • OYad9919, pumping, deue4aring digester cleaning. lagoon cleaning Standard mdU6lrial 090009neesn p10.09ncem (a.g.. &1C 9715) 1 7 a 9 OR Watt American Induediel Ciaesticettm (901051, If known 10.91, 326212) 6 6 2 9 9 1 Employment information Annual average number of employees Tohnl eaparre aarked by ell enplpyees teal year 22450.25 Sign 90re CA Knowingly falsifying lhls document may result Ila One, l Dalby Na11 hams examined 1010 MS04011119 and Matte the best of my knowledge ge awe enmea 0191rue, swage, and complete. (-Men' 09099mal0 01099UHre --rincie 14,14 PhoneDate NiP 71110 OSHA's Form 300 (Rev. 0112004) Log of Work -Related Injuries and Illnesses Attention: This form contains information relelirg lo employee heats and must he used in a manner Thai protects the canfrlengalily of employees to the erdern possible 1.01110 the Informatics K being used for ooxupa0onel safety and health purposes. You must record Irferm0on about every 00rk relazed nJury or lines Nat Involves loss of ce12C10Jsnes2, rag edad ora) acerily or job transl21. 0.42 away tram neck n medial treatment tsyond nrsl aid. You mug also rooadaglacrant work-related Injuries and Illnessestlret are diagnosed by aphysician or Ikensed hedlli careendass(13nel. You net also record we k-1012101 inju6t and nimososiha[meat amya/9e spadfic recalling coterie listed In 29 CFR 1906.6 through 1904.12. Feel iraa b] use too liner fora single case lfyou need to. You met on Injury and 4lness ncldee1 report (OSHA Form 901) or equivalent torn toe each njury er Arrest reporded on 162. form. rd you're not sure shelhar a ease is recadalla cal your local OSHA othce for help. 1 Identify the person Describe the case Classify the case Establishment name City Tacoma Year 2013 U.S. Department of Labor Occupational Safety and eleaIU1 Admfnistretion Form approved OMB no 1218-0176 American Process Group Inc. State WA Rubio reporting burden Wilds cdletUon of nitor/m[1m Is estimated to overage 14 minutes per response, including (me to review the InshuUan, leach and 66nerfhe data needed, and cunplete and review the collegian of hlamnnta. Forum as not required to rerpond to DeoalleWan of Infame6m unless l d'sPlaya a anrrenfiy raid NB control nectar. it you hare any comments abet these ethane [r any meads of this data Colander, [Sh1bah US Decagram of Lobar, Ci0HA Office of Statstics, Roca 143644, 200 Comlbaalen Ave, H4V, Washington, DC 20210. De not send the cernpbted fans MOM Bice. Be sure to transfer these totals to the Summary page (Form SOON before you post it, 0' so 01 5 z Page 1 of f (1) (2) (3) (4) (5) (8) CHECK ONLY ONE box for each case based oh the mos! serious eotrome forlhal case: -- -- - Enter the number of days the injured or ill works! was: Check lho'4njury" (D) (1) A E 3 S eA (2) column Illness: •ays( .= 1 4§ (3) or choose o '2 4 (4) one . so S = (5) two of —. 3 (e) (A) Case No. (0) Employee's Name (C) Job Title (e.g., Weider) (D) Date of injury or onset of illness (mo.rday) (E) Where the event occurred (e.g. Loading dock north end) (F) Describe Injury of lines, parts of body 21)011ed, and object/substance that dlrectty injured or made pennon ill (e.g. Second degree burns on Ohl forearm from acetylene torch} Death (GI, Days awe y y from work (H( Rernained doe eanafer Of fosbIctIon (11 ai work Other -record able cases (J1 A From Mork (days( (K) On fob transfer m restriction (d (L) Page totals 0 0 0 0 a 0 o d 01 0 a 0 Rubio reporting burden Wilds cdletUon of nitor/m[1m Is estimated to overage 14 minutes per response, including (me to review the InshuUan, leach and 66nerfhe data needed, and cunplete and review the collegian of hlamnnta. Forum as not required to rerpond to DeoalleWan of Infame6m unless l d'sPlaya a anrrenfiy raid NB control nectar. it you hare any comments abet these ethane [r any meads of this data Colander, [Sh1bah US Decagram of Lobar, Ci0HA Office of Statstics, Roca 143644, 200 Comlbaalen Ave, H4V, Washington, DC 20210. De not send the cernpbted fans MOM Bice. Be sure to transfer these totals to the Summary page (Form SOON before you post it, 0' so 01 5 z Page 1 of f (1) (2) (3) (4) (5) (8) OSHA's Form 300A (Rev. 01/20041 Summary of Work -Related Injuries and Illnesses AA' estecrishmenl8 owed pp Part 1904 near template Ibis Summary papa, oven tineMimeos or ernesses occurreddurfnp the year. Remembefla review de. Loy re verify lice¢ 880 entries are car047ere flserfir dha Loy, & M the 88778885' 8,3185 you made kr each calateary. Than o88lo the 8rrats Were making sere yoole added rhe sneers from every peps ci 91e icy. H you had no oases emI8 Emproyea9 Fttancl empr0yeee,, end' reeVrepressolatPena Me Y+3lr, 70reYiewIha 0511A Fenn 900 in Hs entirely They arso have ,Fended access ea the GSNA Foes 301 or ds agedvabnf. See 29 CFR 105435, N OSHA'Reconikeeppng rule far further datads on iha access provisions k Th000 fomes. INumbor of Cases Total number of Tota/ number of Total number of cases Total number of deaths cases with days with job transferor other recordable away from work restriction cases 0 ❑ ❑ IG (R) (I) (J) Number of Days Total number of days away from umrk 0 i1<l `Injury and Illness Types Total number of days of job transfer or restriction Total Member Of... (M) (1) injury D (4) Poisoning (2) Skin Disorder D (5) Hearing Loos (3) Respiratory Condition ❑ (5) All Other illnesses Post this Summary ,page From February 1 to April SO of the year following the year covered by the form Pudic repslhy burden ter Mk ootectlm ofirMmelbn is __,__led Is omega 58 minutes per resumes, nduding thie n aevaW the klaucion, march mid We- Ps dale reared,and esectsm and Were the Median dIn0mdhn. Persons are noir }ked is respond toIremhlblorinCrr9lon unless 11 dispkrysa wnsrtly valid 05E redid number. If pm hese anywmnane abutt Inens ssli scr are aspects offis dale odi ton. oo'led: US Need -mentor L oo. 09-14. Chiaof OWIoSo CmomN3641.232Crestonm A.m. n'A. Washinnmr.C1C 272' B. Lb nuaEnoescrrckkd hmo to INS Otte. Year 2014 LLS. Department of Labor 0er7pcapnal 5nfety and Health AdrokArArallOn . num 5,300.8,0 008rw. 1211.0176 Establishment inf0ml0 809 3d. establishment name Am8SWn Process G ... Inc Street 1251 P901140889#800 City Tacoma Slate WA 7Jp 884Cv Indent/3, dwcrlpaon (e.g.. Manufacture el motor buck trallerS5 Redder& Menagsment SerOCee • Pfed01185, 5018741d dewatering digester cloning. bocondeanIntr Standard Industnml Cresslrecaecn (sic), If MINIM (a.p., SIC 1715) 1 7 e 9 OR NOMI 7nkerkl12 Indus0ial Chasihcation INAICS), if known te.g., 859213) 5 9 2 9 9 1 Employment information Annualmem, number of employees Total Mors worked by at employees last year 22585 Sign here LC X Knowingly 'falsifying this document may result Ina One. I certify Bat I have examined the OPAmaer1 and Met tache beat of my knowledge rhe entries are Dae, accurate, and complete ft j\eee. Q- nye• Compenyexecullie G4 tL 4 71241158 \JP nee [Teta OSHA's Form 300 (Rev.01/2004) Log of Work -Related Injuries and Illnesses Attention: This form contains information relating to employee health and muni be used in a mercer that protects the con0dentiallly of employees to the extent posse% while the information its being used for occupational safety and health purposes. You nknetneeard Iafa naton aboli every 4ofeidatel 0(ary or Illness1hatirooloes Vonno.' COIG3100111000. 10Sl1L:ed aril aliuity orjob0ansler, days exaylrem wok, oefascial Iraatrnent beyond Hat eke You must H90 record signlicoNocreacialed injures andllnesses Sal are dltalrcsed by a physician oricensed heallh care professional. You must also raced M19aelaed ejuries aid illnesses that meet anyot3re ¢pectic remrrirg crileis listed in 20 CFR 1904.5 tleougb 1954.12 Feel Fee to metwolries fora single case If yen need m. You must complete an eijury and Phase imideM repertfOSHA Dame 301) equiValant fcem lar ouch ifiury or Ohms recorded mites form Oyalanot sure eluelherepose lerecordable, mil your local OSHA office for help. dentify She person Describe the case Classify the case Establishment name City Tacoma Year 2014 • U.S. Department of Labor Occupational Safety and Health Administration Form approved OMB no. 1210-0576 American Process Group Inc. State WA Pubic reporting burden fm min col ¢ton of irforma5on is estimated to average t4 minuets per response. Including tine Ie review 60Irsba(aol6 search and gather Ihedata needed, and complete and resits IhecalecPon of idoesedm. Penes ore nal repaired 5 respond to the collection of InPomnalbn unless It dealers acurreMy mild CMB conbd mimed. gym hammy ocmmenls Atloid hre00 Estimates cc arig aspects of this d0a oel03501. melted: U5 Department of Labor. OSHA Caccia of Slalkllcs. PNom 53644, 200 Cmsaulkn Ave, MV, Washington. DC20210. Do rotund he completed forms to this office. Be sure to transfer these totals to the Summary page (Form 300A) before you post it. z Page 1cif (1) A (2) (3), (4) (5) (5) CHECK ONLY ONE box for sacro case based on the mo..t serous outcome for that case: __. Enter the number of days the injured or dl worker was: _ . Check the FA) T ,g (f) "injury' .2 D t (2) cofrmn illness: - g Cul or choose _ - {4) one .p (5) type of ffi o (5) (A( Case No. (U) Employee's Name (C) Job Tide (e.g., Weider) {D) Date of injury or onset of illness melds f yl (E( Where the event occurred (e.g. Loading dock no end) {F( Describe Injury or illness, parts of body affected, and objecUsubsla nicethat directly Injured or mads person El Ong- Second degree burro on right forearm from acetylene torch) Death ((3) pays away from work (H) Remained Job transfer or restriction {1) at Work Ther record-. able caves IJ) A, y From Work {01050) ))) Om job hamster or restriction (days( {L) _ Page totals 0 0 0 0 o 0 0 0 11 0 0 0 Pubic reporting burden fm min col ¢ton of irforma5on is estimated to average t4 minuets per response. Including tine Ie review 60Irsba(aol6 search and gather Ihedata needed, and complete and resits IhecalecPon of idoesedm. Penes ore nal repaired 5 respond to the collection of InPomnalbn unless It dealers acurreMy mild CMB conbd mimed. gym hammy ocmmenls Atloid hre00 Estimates cc arig aspects of this d0a oel03501. melted: U5 Department of Labor. OSHA Caccia of Slalkllcs. PNom 53644, 200 Cmsaulkn Ave, MV, Washington. DC20210. Do rotund he completed forms to this office. Be sure to transfer these totals to the Summary page (Form 300A) before you post it. z Page 1cif (1) A (2) (3), (4) (5) (5) OSHA's Form 300A (Rev. 011200,4 Summary of Work -Related Injuries and Illnesses Ak esfabashmeats co.redby Part 7804 must comp)olo this Summary papa, avert if no rrlj'urss dlheases occurred during the year Remember1s re,0s the Logs vertythat the enrrtes are comprete Lasing to Log sand the individual onhasayou made for each category. Than mks the totes below, maklrg sura you'. 9±90meesIriee .+1 every page or the tog If you hadno cases nage •o, Emptoysas formeramployaeo and Man- representafNas hays the right M resew the OSHA Form 3001n 8a entirely. They eta have Meted eaeas lathe OSHA Faun 301. tts epivere. See 25 CFR 7944.35, 0•51450 Re0045kaalltag res.. rw further death Pn ala a cca9gprow17riChe /05113. *umber of Cases Total number of Total number of Total number of cases Tolls[ number of deaths cases with days with job transferor other recordable away from work restriotIan cases 0 0 0 0 (0) (H) (1) IJ) Number of Days Total number of days away from work Total number of days of Job Transfer or restriGlon 0 f51 LLI Injury and Illness Types Total number of... (M) (1) Injury 0 (4) Poisoning (2) Skin Disorder 0 (5) Hearing Loss (3) Respiratory Condition 0 (6)ATI Other Illnesses Post this Summary page from February 1 to April 30 of the year following the year covered by the Farm Pegg 2pnring Wren le NC WIech:oil Ingrate le sensed to mega 6Snlnit p01105 s8hce leg MS m redee•Mielnslnclu, sau5.av gather the dad Mode, and wmphk ted renew NemietCCn higton110. Pelee ere not returad b 9 0110M to lheedleelin d inkehrieun0ss l dephase:aro*lad 0M0 mndanhar. Ifyou NISI sly ounnanle seel9m®Whales a anymparis4MJa sea m!%dim.cruet 11S 0epatnent Lam Osf91 ithprafSOWS. Rein N4644. 200Conab4Un Me.lf1. We4Mpm. OC 20210, banataand Pe oongya' fee IS tae. Year 2015 U.S. Department of Labor Oocupawnai g0 01 end Mediu Adianlsrr�llon Form 0511&sd OMB no. 121ao97d Establishment information Your est elehmesl name American Proops Group Inc. Sbaet 1201 Pacific Avek 900 Cloy Tacoma State WA Zip 96402 Industry (*Satetkn (e.g., Manldathrre sf molar truck trailers) Reedua19 Managemerd Services- Dredging renew. dewaledng. digester cleaning, Wgoon damning standard Industrial Pasairition (5IC). If known (e.g., $IC 37151 1 7 @ 9 OR North American Industrial Glassine lion (NAIOS), @Mown (e.g., 986212) 5 8 2 9 9 1 Employment Information (Venal average numter 00 employees 7091 home worked by el emptoyeea las( year 17660.5 Sign here Knowingly falsifying this document may r9sOft Ina fine. 1 really Mail hake eamined Nis document and the to the heel env knowstdne 11w series are hue, accurate, end templet. Or -Ater. PciC\Cf. NIP Company executive Title Plrtrie bale OSHA`s Form 300 (Rev. 01/2004) Log of Work -Related Injuries and Illnesses Attention: This form wntaine information relating to employee health and must be used in a manner that protects the confidentiality of employees to the extent possible while the information is being used ler occupational safety and health purposes. You most retard ialnmadon about every work-releted'njeryw Moats Kai in rem kiss pt conseicinneto, restricted Nark acgvltyorjtblfanslbr, days army From mark, or madiroltrealmenl beyond first old. You must also retard signtinavtwork-reltlod Iepdes and finesses mal ere riagnesed by a ebysidan a rcensed heath sereppofessional. You mustobe record amk-rrrdad Infuries and Illnesses that meet airy of the spedfcrecadbe orderlaksted In 29 CFR 1999.8 'notch 1 nOt.12. Feelkeel° use Moinesfer a single case if you need to You most complete on Injury and ileeee Melding report (OSHA Form tol) or equiralnt form for each injury or Illness recordation this farm. If yams not sem whether e ease is rewrdabie. tea your local OSHA alike forhelp. Identify the person Describe the case Classify the case Establishment name City Tacoma Year 2015 U.S. Department of Labor Occupational Safety and Health Airmi il:Ann knn Form approved OMB no. 1218-0176 American Process Group Inc. Stale WA Putipracert r0burden kr this yolaclim of Infw nation is eafrneted to average 11 minutes perranpcne, Incbdng tiros N radix ate Instruction, ssoreh and pato the data needed, and template end reulee Ore ro ello r of mfwmahon. Persons are not required to respond lathe Wtedlon of Information unlesstdlsploys e carrendryalid Cid9 onalrel number. If yno haw any wormer%shout these estimates or any aspects of this catectim, contact OAS Department of Leber, OSHA Ofiw ofstalis4Ds, Room 0-3044, 200 Constitution Ave. HW, Waehn(lon, (7020210. Do not send the oanrleled farms m Nis a Be sure to Irensfer these totals to the Summary page (Form 300A) before you post iL Page 1of1 5 z (1Y (2) (3) (4) (0) (B) CHECK ONLY ONE box for each ceee based on the most serious outcome for that case: ------ - -- - - - Enter the number of days 0,e injured er ill worker was: - Check the (M) 4. _ (1) "injury- Y ga o N (2) columna Illness: - ---- t. E ,S v. a (3) choose ---- ry` a (4) one - J 1 (0) type of 1 (6) (A( Casa No, (ah Employee's Name (C) Job Title (e.g. Welder) (P) dale of Injury er onset of illness Ono/day) (E) Where the event occurred (e.g. Loading dock north end) )F) Describe !Rimy or illness, parts of body effected, and objechaubetance that directly injured or made person III (04 Seoord degree burns en right forearm from acetylene torch) Death ) ) Days away from . (H) Remained Job transfer or restriction (I) at work OOoer record- able cases IJ1 Awkis From wok {days) (K) On job transfer or r9afrittion (days) (L) Page totals o a 0 0 a 0 0 0 0 0 a 0 Putipracert r0burden kr this yolaclim of Infw nation is eafrneted to average 11 minutes perranpcne, Incbdng tiros N radix ate Instruction, ssoreh and pato the data needed, and template end reulee Ore ro ello r of mfwmahon. Persons are not required to respond lathe Wtedlon of Information unlesstdlsploys e carrendryalid Cid9 onalrel number. If yno haw any wormer%shout these estimates or any aspects of this catectim, contact OAS Department of Leber, OSHA Ofiw ofstalis4Ds, Room 0-3044, 200 Constitution Ave. HW, Waehn(lon, (7020210. Do not send the oanrleled farms m Nis a Be sure to Irensfer these totals to the Summary page (Form 300A) before you post iL Page 1of1 5 z (1Y (2) (3) (4) (0) (B) 0TERVITA Via Email: cmprince@amprocessgroup.com September 14, 2016 Cayla Prince American Process Group (Canada) Ltd. 946 Boulder Blvd. Stony Plain, AB T7X 0E6 Steve Smyth Direct: 587.233.3462 Fax: 403.231.8445 ssmyth@tervita.com Dear Cayla: Re: APG OSHA log 300 American Process Group was formerly owned by Tervita Corporation. In accordance with your request, this letter will confirm that Tervita's compliance team has reviewed Tervita's OSHA logs for the past three years. Our review of these records has confirmed that there were no Togs within the last three years for the US American Process Group division of Tervita. Please let me know if you require any further information. Yours truly, Tervita Cor ' oration Steve Smyth Senior Legal Counsel CC: Megan Delarey — Contractors & Compliance Advisor Tervita Corporation 500, 140 - 10t'' Avenue SE Calgary, AB T2G OR1 T: (403) 233.7565 F: (403) 231.8445 tervita.corn AMERICAN PROCESS GROUP INC. RESOLUTION OF DIRECTORS WHEREAS the undermentioned persons are all of the Directors of AMERICAN PROCESS GROUP INC.: - COLLEEN PRINCE DOUG VAN DER VEEN TERRY JOHNSON AND WHEREAS the Business Corporations Act provides that a Resolution in writing signed by all of the Directors of a Corporation is as valid as if it had been passed at a Meeting of the Directors. NOW THEREFORE BE IT RESOLVED: - 1. THAT John Prince or Colleen Prince are entitled to and have the authority to execute Bids, Proposals, or Contracts and any other documents ancillary to the Bids, Proposals, or Contracts, on behalf of American Process Group Inc. 2. THAT John Prince or Colleen Prince are hereby authorized to execute and deliver all documents necessary to give effect thereto in the name and on behalf of the Corporation under its corporate seal or otherwise, with such amendments or variations as the they may approve, their approval to be conclusively proved by their signatures thereto. WE, being all of the Directors of the Corporation, do hereby pass, adopt and approve the foregoing Resolutions of the Directors, effective this 1 s` day of May, 2016. COLLE PRINCE DOUGLAS VAN DER VEEN TERRY JOHNSON TRAVERSE CABLE DREDGE HEARN ROAD STAGING LAREA ACCESS AREA THIS DRAWING IS OF A CONFIDENTIAL NATURE AND SHALL NOT BE REPRODUCED IN AMY MANNER, EXCEPT —BYWRITTEN PERMISSION OF AMERICAN PROCESS GROUP. 11/29/16 D 11/29/16 DAV DAV ISSUED FOR BID ISSUED FOR REVIEW DESIGN DAV CHECKED City of Corpus Christi O.N. Stevens WTP Intermediate Sludge Removal Site Layout Diagram A NO. DATE BY REVISION CHKD DRAWN DAV APPROVED SCALE 1 "=400' SHEET 1 of 1 DATE 29 Nov 16 DRAWING Ho. 16 -036 -SL -001-0 i SLUDGE PUMPS -SLUDGE TANK POLYMER STORAGE POLYMER DRAW TANK IPOLYMERI TOOL PORT -A- POTTI E MAKEDOWN TRAILER PIPELINE WHEEL LOADER TRANSPORT TRUCK HEARN ROAD ■.:IIIIIIIIIIII THIS DRAWING IS OF A CONFIDENTIAL NATURE AND SHALL NOT BE REPRODUCED IN ANY MANNER, EXCEPT -BY WRITTEN PERMISSION OF AMERICAN PROCESS GROUP. 1/29/16 0 1/29/16 DAV DAV ISSUED FOR BID ISSUED FOR REVIE DESIGN DAV CHECKED City of Corpus Christi O.N. Stevens WTP Intermediate Sludge Removal Site Layout Diagram A DATE BY REVISION CHKD DRAWN DAV APPROVED SCALE 1/64"=1'-0" SHEET 1 of 1 DATE 29 Nov 16 DRAWING No. 16 -036 -SL -002-1 Q Risk Name: RAFTER P TRANSPORT CORP WORKERS COMPENSATION EXPERIENCE RATING Risk ID: 4210581/3 Rating Effective Date: 07/19/2015 Production Date: 02/20/2015 State: TEXAS State VA Exp Excess I Expected 4 Exp Prim II Losses 1 Losses 1 Losses Tx 09 25,2761 42,1211 16.845 (A) (i3) (C) Exp Excess (D) Expected (f (E) Exp Prim (F) Act Exc (0) Ballast Wt; Lases (0 - E) Losses I Losses Losses (R - I) 09 25,276 42,121 16,8451 22,328 Act Exc Losses] Ballast Act lac Losses T Act Prue Losses 22,328: 23,000 65,021 42,693 (H) Act Inc uses (I) Act Prim Losses 23,000 54.466 42:138 (1) Actual Pr Mary Losses Stabilizing Value Ratable Excess Totals 42,138 (E) Expected 16,845 C•(1 -A)+G 46,001 C (1 -A)+G 46,001 (A) * (F) 2,010 (J) 90,149 (A) (C): 2,275 (K) 65,121 ARAP FLARAP SARAP Factors 1 MAARAP Exp Mod 1.38 RATING REFLECTS A DECREASE OF 70% MEDICAL ONLY PRIMARY AND EXCESS LOSS DOLLARS WHERE ERA IS APPLIED. Carrier: 29939 - 000 Policy: 0001170688 Eff-Date: 07/19/2014 Exp -Date: 07/19/2015 ID Copyright 1993.2015, Al rights reserved. This product Is comprised of cerriplatIons and information which are the proprietary and exclusive property of the National Council an Compensal ii Insurance, Inc. (NCCI). No further use,. dissemination,. sale, Iranster, assignment Or disposition atilt product. in whole or In part. may he made without the prior written consent of NCCI. This product is furnished 'As is" 'As available' 'With all defects- and includes information aysifelAa at the lime of publication only. NCCI makes no rearesentO1iOns or warranties of any kind re9ating to the product and hereby expressly disclaims any and ell express. statutory, or implied warranties, including the implied warranty of merchantability, fitness for a particular purpose, accuracy, completeness, currentness. or correctness of any information or product furnished hereunder. All responsibdily kir the use of and for any and an results derived ce obtained through the useof the product ars the end user's and NCCI sha[I not have any liability Thereto. V - Page 1 oft WORKERS COMPENSATION EXPERIENCE RATING 17 Risk Name: RAFTER P TRANSPORT CORP Rating Effective Date: 07/19/2015 Risk ID: 421058113 Production Date: 02/2012015 State: TEXAS 42 -TEXAS Carrier: 29939 Firm! ID: Firm Name: RAFTER P TRANSPORT CORP Policy No. 0001170688 Eff Date: 07/19/2011 Exp Date: 07/19/2012 Code ` ELR 0- 1 Ratio! Payroll 1 Expected Losses Exp Prim Losses Claim Data Ll OF Act Inc Losses Act Inc Act Prim Losses i Losses 7219. 2:76 .40i 383,082 10,203 1.0,573 4,229 99P0678692 104 F 15,500 33,965 15,500 8234 1.61 .40i 70,187 518 1,130 452 99P0699293 06 F 8809 365 j 365 8809: .07 .351 25,650 Subject Premium: 87,830 18 . 6 Policy Total: 473,84 1 Total Act Inc Losses: 19,771 Policy Total: 478,919 Subject Premium: 49,550 Total Act Inc Losses: 34,350 42 -TEXAS Carrier: 29939 Firm ID: Firm Name: RAFTER P TRANSPORT CORP Policy No. 0001170688 Eff Date: 07/19/2012 Exp Date: 07/19/2013 Code ELR 0- Ratio . Payroll Expected Losses Exp Prim Losses Claim Data id OF Act Inc Losses Act Prim Losses 1 7219. 2.76 40 369,684 10,203 4,081 99P0702834 04 F 19,343 15,500 8234 1.61 .40 80,413 1,295 518 99P0710023 06 F 428 428 8809 :07 ::.35 23,750 17 6 Subject Premium: 87,830 Total Act Inc Losses: 10,900 Policy Total: 473,84 Subject Premium: 48,843 Total Act Inc Losses: 19,771 42 -TEXAS Carrier: 29939 Firm ID: Firm Name: RAFTER P TRANSPORT CORP Policy No. 0001170688 Eff Date: 07/19/2013 Exp Date: 07/19/2014 DOdG . ELR ' t7- tfrt? Payroll Expected Losses Exp Prim . Losses } Claim Data '. LI OF . Act trlc. Losses Act Prim Loses:: 5,354 7219. 2.76: .40:: 608,437 16,793 6,717 99R0761471 ,05 F . . 5,354 8234 1.61 .40 128.808 �.. 2,074 18 830 8000900683 105 F 5,546 5,546 8809 . 35 25,175:.: 6 Policy Total: 762,420 Subject Premium: 87,830 Total Act Inc Losses: 10,900 113 Copyright 1993-2015, Aft rights reserved. This product is comprised of Compilations and eifomsa'Gon wAtiCh are the proprietary and err;lusive property of the National Council On Compensation insurance, Inc, (NCCI). No further use, dissemination, safe, transfer, assignment or disposition of ibis prodtxl, in whole or to pert, way be made without lice prior written consent of NCCI. This product is furnished As is- "As available' "With all defects' and includes information available at the Erne of publication only. NCCI makes no representations or warranties of any kind relating to Me product and hereby expressly disclaims any and ail express, statutory, or implied warranties, including the Implied warranty of merchen[ebiety, eines Rt a parboular purpose, accuracy, completeness, currenlr ass, or correctness of any, information ar product furnished hereunder. All responsibility for the use of and for any and al results derived cr obtained through the use of the product ata the and users and NCCI shat not have any lability thereto. . Total by Policy Year or all cases $2000 or leas. D Disease Lova C Cafast Orris Loss E Employers Liability Loss X Ex -Medical Coverage iE Limited Loss U USL&HW V - Page 2 of 2 WORKERS COMPENSATION EXPERIENCE RATING NLC►, Risk Name: RAFTER P TRANSPORT CORP Risk ID: 421058113 Rating Effective Date: 07/19/2014 Production Date: 02119/2014 State: TEXAS Stats Wt 1SRP. I Exp Excess Losses Expected i Exp Prim Losses Losses Act Exc Lasses Ballast Act Inc Losses Act Prim Losses x 091 0 2.?,567 29,8561 62091 '591![ 8,463 . rJ1, 110 157931 (A) Wt ( }1 (c1 Exp Excess Losses (1) - E) (D) Expected Losses (E) Exp Prim 1 (F) Act Exc Losses Losses (i4 - I) (G] Ballast (H) Act Inc 1 (I) Act Prim 1 Losses 1 Losses 091 1 23.587 29.856 6,2691 75,91i 8,463j 91,710115,79! Pr many Losses Stabilizing Value Ratable Excess Totals J Actual (1) 15,793 C * (1 -A)+G 29,927 (A)"(F) 6.833 (J) 52,553 Expected (E) 6,269 C•(1-A)+O . 29,927 (A)"(C) .(K) 2.123 38,319 ARAP Ft,ARAP 1 SARAP •MAARAP• Exp Mod Factors 1.3j 'Carrier: 29939 - 000 Policy: 0001170688 Eff-Date: 07/19/2013 Exp -Date: 07/19/2014 Co pynghr 199.3-2014, Au rights reserved. This experience modiricahon factor is = mpriaed or compilations and information which are -1111a proprietary and exc€uBve p e of the of t Cauncil on Carnpensawn ingur ence, Inc. [NCCif. Na further use, disseminalian, at�fr:i tran*Fer, asragnment or disposition Gf this e;<perience rating mod€rrWtiun fa4Hpr Ora RttlePeoF may ba mad without the written consent of NCO. NCCI makes no representation or warranty, expressed or implied, as to any natter whatsoever including but not limited io the accuracy of any information, product or smite furnished hereunder and, as ;o NCC', recipient of this experience rating rrlvdr o adon factor subscribes to and utGlites the information servtx "as is". ` WORKERS COMPENSATION EXPERIENCE RATING IVV/F.) Risk Name: RAFTER P TRANSPORT CORP Risk ID: 421058113 Raking Effective Date: 07/19/2014 Production Date: 02/19/2! 014 State: TEXAS 42 -TEXAS Carrier: 29939 Firm ID: Firm Name: RAFTER P TRANSPORT CORP Policy No. 0001170688 Eff Date: 07/19/2010 Exp Date: 07/19/2011 Code ELR 0- Ratio Payroll Expected Losses Exp Prim Losses Clain Data lJ OF Act Inc Losses Act Prim Losses 7219 2.53.21 303,491 7,678 1,512 99L0620575 4 r 37,589 5.000' 8234 1.54{ .21 49,396 761 160 1,081 227 99P0699293 11111111.111 6 F 8809 07 20 25,051. ... 18 _ 4 25,650 18 4 Policy Total: 478,919 Subject Premium: 49,550 Total Act Inc Losses: 34,350 Subject Total Act Inc Policy Total: 377,938 Premium: 41,309 Losses: 37,509 42 -TEXAS Carrier: 29939 Firm ID: Firm Name: RAFTER P TRANSPORT CORP Policy No. 0001170888 Efi Date: 07/19/2011 Exp Date: 07119/2012 Code ELR D- . Ratio Payroll Expected Losses Exp Prim Losses Ciaim Data Iy OF Act Inc Losses Act Prim Losses 721.9 2.53 .21 383,082 9,892 2,035 99P0678692 4 F 33,985 5,000 8234 1.54 .21 70,187 1,081 227 99P0699293 11111111.111 6 F 365 1111111111111111111111111 428 8809 -.07 ..20 25,650 18 4 Policy Total: 478,919 Subject Premium: 49,550 Total Act Inc Losses: 34,350 42 -TEXAS Carrier: 29939 Firm ID: Firm Name: RAFTER P TRANSPORT CORP Policy No. 0001 170688 Eff Date: 07/19/2012 Exp Data: 017/19,70'3 Code ELR D- Ratio Payroll Expected Losses Exp Prim Losses Claim Data LI OF Act Inc Losses Act Prim Losses 7219 2.53 .21 369,584 9,353 1,954 99F0702834 4 F 19,343 5,000 5234 1.54 .21 80,413 1,238 260 99P0710023 6 F 428 428 8809 .07 .20 . - . 23,750 17 3 Policy Total: 473,847 Subject Premium: 48,843 Total Act Inc Losses: 19,771 Copyright 1901-2014, Ail rghs reserved. This e,peraenee modification factor is comprised of compilations and information which ars the proprietary and exclusive nrairserpgAellesrlmai Council on Gorrvan5ation Insurance, Inc. (NCC1I. No runner use, dissemination, sale, transfer, assignment or disposition of this expenence rating modrf cation Factor or anyff.:emai- l-nay be used without the written consent of NCCI. NCC1 makes no representation or vmrranty, expressed or implied, as to any matter whatsoever including but not limited to the accuracy of any information, product Or cervico furnished hereunder and, as to NCCE, recipient of this experience rating modification factor subscribes to and ttlizes the information service "as is". • Total by Poli y Year of all cases 52000 or less. D Disease Loss C Catastrophic Loss E Empbynrs Llabllrty Loss X En,Medxal Coverage g Limited Loss U USL&14W WORKERS COMPENSATION EXPERIENCE RATING NCR Risk Name: RAFTER P TRANSPORT CORP Risk ID: 421056113 Rating Effective Date: 07/19/2016 Production Date: 02/12/2016 State: TEXAS State Wt Exp Excess I . Expected Losses Losses TX 09 (A) (B) (C) Exp Excess Wt Losses (D - E) L.Oti 23,161 23,161 Exp Prim Losses Act Exc Losses Ballast Act ins Losses Act Prim Losses 38,527 15,366 (D) Expected L (E) Exp Prim Losses Losses 38,527 15.366 Actual 28,044 (F) Act Exc Losses (Ff =1) 28.044 23,750 0) Ballast 23;750 82.7391 54,695i (1i) Act Inc Losses (t) Act Prim Losses 81,8001 53.756 Pr many Losses (I) Stabilizing Value Ratable Excess 53,756 (E) Expected 15,366 C (1 - A) + G 44,827 C*(1 - A) + G 44,827 (A) * (F) 2,524 (A) " (C) 2,084 AAP Factors FLAAAP SA AP Totals (J) 101,107 (K) 62.277 MAARAP Exp Niod (.1) ! (K) 1.62 RATING REFLECTS A DECREASE OF 70% ED ICAL ONLY PRIMARY AND EXCESS LOSS DOLLARS WHERE ERA 1S APPLIED, Carrier: 29939 - 000 Policy: 009 1 1 70688 EtI-Date: 07/19/2015 Exp -Date: 07/19/2016 Gt 7yright 1993-2416. All rights reserved. This product is comprised of eampilatiofs and information which are the proprietary and exclusive properly of the Nalional Council on Compensation Insurance. Inc. (NCCI). No funnel use, dissemination, sale, transfer. assignment or d-lsposIlion of this product, in whole or in parr, may he made without the prior written consent of NCCI. This product is furrfished "As is" 'As avail ante- -With all defects" and inrli isles information available at the time of publication only. NCGl makes no representations or warranties of any kind relating to the product end hereby expressly disclaims away and all express, statutory, or implied warranties, including the implied warranty of merchantabilly, trtness for a particular purpose, accuracy, completeness. currentness, or correctness of any information nr product furnished hereunder. All responstbilily for the use of and for any and all results derived or obtained through the use of the product are the end user's and NGCt shall not have any liability thereto. V - Page 1 oft code ELR D - Ratio 7219_1 2.45 .40 8234 1.61 .39 061: .35 WORKERS COMPENSATION EXPERIENCE RATING YV Risk Name: RAFTER P TRANSPORT CORP Risk ID: 421058113 Rating Effective Date: 07/19/2016 Production Date: 02/1212016 State: TEXAS qd- I txa5 Firm ID: Firm Name: RAFTER P TRANSPORT CORP Carrier: 29939 Policy No. 0001170688 Eff Date: 07/19/2012 Exp Date: 07/19/2013 ode ELR 7219 8234 8809.. D - Ratio 2.45 .40 1.61 .39 Payroll Expected Exp Prim I n Claim/ Data Losses Losses 369,684' 9,0571 3,623 ,06 .35 Policy Total: 80,413 1,295 505 23,7501 • 14 .: 5 IJ OF, Act Inc Act Prim Lasses Losses 99P0702834 04 F 19.343 16,000 99P0710023 06 F 428 426j Subject Total Act Inc 473,64 Premium: 48,843 Losses: 19,771 42 -TEXAS Carrier: 29939 Firm ID: Firm Name: RAFTER P TRANSPORT CORP Policy No. 0001170688 Eff Date: 07/19/2013 Exp Date: 07/19/2014 8809 Policy Total: Payroll Expected Losses 608,437 128,808 25,175. Exp Prim Losses Claim Data IJ OF 14,907 L 2,074 15 5,963 99R0761471 05 F 809 8000900683 05 5 Subject 762,420Premium: 87,830 Total Act Inc Losses: Act Inc Act Prim Losses Losses 5;3541 5,354 40.482 16,000 45,836, 42 -TEXAS Firm ID: Firm Name: RAFTER P TRANSPORT CORP Carrier: 29939 Policy No. 0001170688 Eff Date: 07/19/2014 Exp Date: 07/19/2015 Cotte f ELR D- . - Ratio! 7219 8234 2.45; .401 1.61 ,06 .351 ,06 8809 8810 .391 .39 Payroll Expected Lasses 419,641 Policy Total: 53,549 12,000 24,868 Subject 510,0 Premium: 10.281 862 Exp Prim Claim Data IJ OF Act Inc Act Prim Losses j_ Lasses Losses 4,112 1 7000939499 105 F 16,219 16,000] 336 NO.2 06 ` 913 913 7 15 6 57,847 Total Act Inc Losses: 17,132 0 Copyright 1993-20/6, All rights reserved. This product is comprised of compilations and inlormat on whsch are the proprietary and exclusive property of the National Council on Compensation Insurance. Inc. (NCCI). No further use. dissemination, sale, transfer, assignment or disposition of this product, in whole or in part. may be made without the prior written corsenl of NCCI. This product is Iurnished'As is" "As available- 'With all defects' and includes information available at the lime of publication only- NCCI makes ne representations or warranties or any kind relating to the product and hereby expressly disclaims any and all express, statutory, or impied warranties, incruding the implied warranty of merchantability, fitness for a particular purpose, accuracy, completeness, currentness, or correctness of any inlorrnation or product furnished hereunder- All responsibility for the use of and for any and all results derived or obtained through the use of the product are the end users end NGGI shall not have any liability thereto. Total by Poiey Year as all cases $2OOI3 or leas. 0 Disease Loss X Ex -Medical Coverage G Catastrophic Loss E Employers Lability Loss Limited Loss LI USL&HW V - Page 2 of 2 Texas Mutual 6/6/2014 3:28:12 PM PAGE 2/004 Fax Server WORKERS COMPENSATION EXPERIENCE RATING 191EE"P. Risk Name: R & R PETRO SERVICE INC Risk ID: 420772130 Rating Effective Date: 09120/2014 Production Date: 0E402'2014 State: TEXAS =]Cate . .. ).^: - :-. Lx17 LXCF- Loss s (:4"1E_CFCd :Losse.5.:. '. L.:[p Prim ' �y ...- LU<S %Ai'f Lk:c t_75SP,F ... :, .. L. ' r�. .. . : Act Inc),:.esses: Act Frttll .... ; _ 5es .. Lo __ _... 1-7 .... 5E 4,844 533 n -`_ .rr 6.2 63—, 'A) i1 (:IP.) 1 fc) Exf� E tces5 {p1: E-Lrectecl .osacS 0 • El L0'55Ls Ey Exh Pr. n. (F)kct Exc i„GatiiS Losses tHf.t . IG 0: €l:t 1 /LHi'Act !nc ,. sscS d] Acf 171 i n . LOsst-s 11: ` ..r -1 •:.1 .7 9861 0 Col i:3% r3;' :2 tirnar]' Loss . St�bi132TIr`.0 .s/allie : : Ratak: e Excess.. ... .`Dials ....::. it Actual (331 G,(1.. A)+G 11,088 (A)1(F) 0 (J) ' 1,±2r5 :-1 'Lti. riPc.=d `,,., G.• (1 -'A) +G";:::::„ '':.:,:::'.: 1,088 (A) • (C)....:.:: -'L [Ki r�R .:: f-..., 5P : _ :. SARAP .: NI CRAP• EAR Nltud : Factors I' .95 Carrier: 29939.. 000 Policy: 0001228740 Eff-Date: 09/20/2013 Exp -Date: 09/20/2014 Copyright 19932014, All rights reaerved. Thls experience isodlricalion tactor N comprised o1 co lnplla bona and Inrar na ion which are the proprietary and exclusive pro party otthe National Council on Compensation Insurance, Inc. (NCCI). No -further use dissemination: ease. traisfer assign rert or is costia n attars experience ruing modeicadon-factor or any part Merest may lie used vitro Ut Me Witten COnaentef Net. NGI makes re represeAlA An Or'.varrs y, expressed o- implied, as to any matter wIataeever including but not Iimitee to the accuracy Of any int0fmafo n, ddL t or service }unlisted hereu rdaf and, as to NCCI. raCipiert of this excels—ice rat rg modihc a:on factor subscribes to and utifzes the information serf ice 'Xis Is'. V - Page 1 of 3 Texas Mutual 6/6/2014 3:28:12 PM PAGE 3/004 Fax Server WORKERS COMPENSATION EXPERIENCE RATING Risk Name: R & R PETRO SERVICE INC Rating Effective Date: 09/20/2014 Risk ID: 420772130 Production Date: 05'02)2014 State: TEXAS 42 -TEXAS Carrier. 29939 Firm ID: Firm Name: R & R PETRO SERVICE INC Policy No. 0001153268 Cr,ife' ELS. P.ayr6l1 Exirrt:ted. Eff Date: 02/1272012 3724. 6219 1:15 1.49 ................................ .20 .::...... .::::.::..:.;148,937 .21 19552 8810 06 .22 20,576 Exp Date: 0211212011 � [7ati3 . IJ itF ActJnc. !.tort Fri rI Lcss?s :. _asses.' 61 PoIlcy Total: 188,225 Subject Premium: 8,938 Total Act Inc Los 42 -TEXAS Firm ID: Firm Name: R€:?PE-HO 5ET,VCE '10 Carrier: 29939 Policy No. 0001153268 Corte 3724. 5191 26 2L .22 1 2002 14,378 .............. I :rri.F's 37 Eff Date: (1)11:70(71 op Furl 8 Exp Date: 0;017:'017 8809 :07 20 ..................... . 9,978 8810 .06 22 3,836 Policy Total: Subject 46,992 Premium: 1.146 Total Act Inc Losses: 01 42 -TEXAS Firm ID: Firm Name: R & R PETRO SERVICE INC Carrier: 29939 Policy No. 00012207 Code ELS f : 5-.. patio 3724 1.15 .20 3724 1.15 .20 P3yzoll 21.;7.42 Expected .. Les 250 Eft Date: 09120/2011 Exp Date: 09(20/2012 k.p Pitm Losse 50 C airl:Da.ta IJ :OF Act ln,. Act Fri•n .. .. :'• Losses.. • :_osses• 33,1 .5191 26 5191 6219 .26 1:49 1.49 .06 06 6219 8810;. 8810 .22 22 21_ .21 .22 22 35;821 60,693 511 780 15,349 23,394 1 76 1;,1.:2.o:=:23 158 12 9 14 2 3 Policy Total: 196,428 Subject Premium: Total Act Inc 4,009 (Losses: Copyright 1993-2014, All rights reserved This experience modiflcadon factor Is comprised of compllatons end IMdnnertion Which are the proprietary and eXGrL31ve property' ro'the stational Cannon on Compensation Insurance, Inc. (NCCI). No further use, dissemination, sale, transfeer_ assgnment or disposition of less (experience ralirg modfezt or motor u• any gaff hicmof Tay to used wtno LS taewer ten consented NCCI. NCCI makes cm representation or warranty, expressed or Implied, de to any matterwhatsoever Including Die not limiter: n: ma arzuracy of a -yr' information, product or service furnished hereunder and, este NCCI, recipient of this experience nein InddUlcetion factor satrecribes to and Wises the informs:don service "as ire. • InGI t, Valicy Yeal cl all Gases $2tTnTor less. ID I), -,ase Inns C Caast Ophlo Loss C Employers Debi ty Loss X Er -Yeo Ica l Coverage 0 Llmlted Lolo U U&LEHey V- Page 2of3 Texas Mutual 6/6/2014 3:28:12 PM PAGE 4/004 Fax Server WORKERS COMPENSATION EXPERIENCE RATING 7NCCJI Risk Name: R & R PETRO SERVICE INC Risk ID: 420772130 Rating Effective Date: 09120/2014 Production Date: 05,'02t2014 State: TEXAS 42 -TEXAS Carrier. 29939 Firm IU: Firm Names R & R PETRO SERVICE INC Policy No. 0001228740 Eff Date: 09/20/2012 Exp Date: 09(20/2013 3724 5191 0 pyx Rauf},., 1:15 .20 .25 .22 £xlrlez<i'. Losse 6 319 9}� PrPrim 245 99H0734919 08 70 16 6 .. 6219 1.49 .21 5.155 77 8810 .05 .22 45,705 27 Cr:I Datb .:€J !OF Actin F AptFrin Losses _nsses 837 Policy Total: 280,0811 Subject Premium: 8,243 Total Act Inc Losses: 6371 Copyright 19932014, Ar rights reserved Tnls experience mod Morton tactor Is comprised of compilations end IMdnmertlon which are the proprietary and excittive property' rot the nations! Council on Compensation Insurance, Inc. (NCCI). No further use, dissemination: sale, transfeer_ ass.gnment or disposition of des experience ming modfican on actor u• any paint hicieiof ray ea used wtnout toex'rAten consent& NCCI. NCO makes no representation or warranty, expressed or Implied as to any matterwhatsoever Including pit not amps:: tr. ma accuracy of a Information, product or service furnished hereunder and, este NCCI, recipient of this experience nein InddUlcation factor guhscrtoee to and vises the informs:don service "as ie•. • l nG l by Va liry Year d' all W yes $2060 or less. I/ 1)..=.._. a se Inns C Caast•ophlo Loss E Employers Lobi L Loss X Er -Yeo Ica I Coverage *Limited L010 U U&L&Hry V - Page 3 of 3 Texas Mutual 5/26/2015 7:14:08 AM PAGE 2/004 Fax Server Mats; WORKERS COMPENSATION EXPERIENCE RATING Risk Name: R & R PETRO SERVICE INC Rating Effective Date: 09/20/2015 Risk ID: 420772130 Production Date: 04/21/2015 State: TEXAS ri 05 .05 2,995 2,9961 4,894: 4,8941 1,8991 1,899 23.000 •637]• 537 23,000 191 191 Actual 191 25,845 0 (J) 26,036 Expected 7,8 . p P Factors (J) I (K) .93 RATING REFLECTS A DECREASE OF 70% MEDICAL ONLY PRIMARY AND EXCESS LOSS DOLLARS WHERE ERA IS APPLIED. Carrier: 29939 - 000 Policy: 0001228740 Eff-Date: 09/20/2014 Exp -Date: 09/20/2015 +3 Cupyriuhl 198&2015. AIl righty reserved. This prcducl is corirnr.sed of cooripila5oils arid information which are die proprietary and exclusive propedy of the National Courcii on CormensatOn Insurance. Ina (NCCI). No further use• dissennnatton, sale, Pander. a_ssigrunenf or disposition of this product, in whole or in part, may be sande wifhout tree prier written consent of NCCI. This product Is furnished `Arias' "As avat4abla' With all defals" and includes iriformiaon available at the time of public -eon only. NCC rnakea no representations or wiyrentiiea of any kind relating to the irodxt and hereby expressly disdain's any and ail express, statutory, or implied warranties, including the implied warranty of in°rchentabily, fitness Sy a particular purpose, accuracy. completeness. currentness, or csgrou less of any infor.^Tatlon or product furnished hereunder. All responsibility for the use of and for any and ail reaults derived or obtained through the use of the produa< are the end user S and NCCI shall not have any liabilay {hereto. V - Page 1 of 3 Texas Mutual 5126/2015 7:14:08 AM PAGE 3/004 Fax Server WORKERS COMPENSATION EXPERIENCE RATING Risk Name: R & R PETRO SERVICE INC Risk ID: 420772130 Rating Effective Date: 09/2012015 Production Date: 04/21/2015 State: TEXAS 42 -TEXAS Firm ID: Firm Name: R &R PETRO SERVICE INC Carrier: 29939 Ccs R 0Y - Ratio 372« 1.27 .38 5191 .30.40 8309 Policy No. 0001153268 PaYi6lf Expe616d 14,378 43 7 .35 9,978: 8810 .08 .41 3,636 Policy Total: 45,992 Subject Premium: Cif Date: 02/12/2011 Exp Date: 1151 5t20 " p f rtr €F.... Chi rn Data: Lxxs.:e.:: :. 1,148 Total Act Inc Losses: 3 E5P Ast Irie-Att'PrirrA 42 -TEXAS Carrier: 29939 Firm ID: Firm Name: R & R PETRO SERVICE INC Policy No. 0001275740 Eft Date: 09/2012011 Exp Date: 09/20/2012 3724 1.27 .38 21,742. ...:: "': ;2276. 105 3724 1.27 36] 33,1361 421 150 5191 30: 40 39,821 :: 119 48 5191 .30 .40 60,6931 182 73 6219 1.80 .40 511 9 4 8810 06 41 15,348....: :.....: 6219 1.80 .40 780 14 8810 ] .06 L.._ 411..._..._..._....,.....23.394 L........__.._........_.._..._14 Sublect 195,428 Premium Policy Total: Total Act Inc Losses: 42 -TEXAS Firm ID: Firm Name: R & R PETRO SERVICE INC Carrier: 29939 Policy No. 0001228740 Eff Date: 09/20/2012 Cc d ELR " D pop -oil Expeetedl :::.... .....:::::::::. .......................... 3724 1.271i 389 106 ,846 :: 1,354 5191 .301 .40 122,560 368 6219 1.601 .40 5,155 . 93 3810 .061 .411 45,7051 27 [Subject Policy Total: 280,066 Premium: Claim Exp Date: 09120/2013 Copyright 1%3-2015: NI ruts reserved. This product Is contprbe1 of compllaycns arid informa5en which are the proprietary and exduaNe property of the National.. Counei[ an Caaey]ensatan Insurance. Inc. (NCCI). No runner use. disseinnetfon: save: t•ansfer, assignment or disposition of this product, in ernPe or in pit, may be made with hit Etre prior written consent of NCCI. This produdc is furnished 'As re `As avatable' With all defects" and Includes information avallabie at the lime of publicaton only. NCO rrraKes no representations or wemerities of tarty lend rg4fingto tlhe prpdVCf and hereby expressly ri9deirrs env end ati express: sta'utcry. or Implied uerrentlea, incluang the implied %temerity of rnerchenietriRy, fitness fa' a iradir.ular purpose, accurauy, rumple[rrners, currerrfne:u,, or mrredness of any into „,,,fief, or profua furnisher! hereunder.. All responsibility her Ihe une of and for any :md ail Pa sult6 derived Cr obtained through the use of the predict aro the end uses and NCCI shall nil have any liability chafers. • Total by Policy Year of at case3 S200C orless. 0 Disease Loss C Gatos lmpfrx: E Empinyars Liability 1.m'i KEx-*&clic! Coverage At Limited Loss ti litSL&FIW V- Page 2of3 Texas Mutual 5126/2015 7:14:08 AM PAGE 4/004 Fax Server WORKERS COMPENSATION EXPERIENCE RATING Risk Name: R & R PETRO SERVICE INC Risk ID: 420772130 Rating Effective Date: 09/2012015 Production Date: 04/21/2015 State: TEXAS 42 -TEXAS Carrier: 29939 cele.....®.11, Ratio 37<« 1.27 5191 .30 6219 Firm ID: Firm Name: R &R PETRO SERVICE INC Policy No. 0001223740 Eff Date: 09/20/2013 Exp Date: 09!23 •4 P y+r l Expected $ fp f r Claim 1 Loses Losse 38 .941 :::660 .40 149,916 450 1.60 .40 30,965.. 557 8809 ] .07 .35 45,7931 32 88-1Q 46: 41 47,3371 28 :Subject POIICy Total: 325.952Premium: 2€1 180 223 11 E5 Ast Irie Losses • Ai I Priv Losses 11 $,527 Total Act Inc Losses: Copyright 103-2015: NI ruts reserved. This product Is contprbe1 of con pIIatlons arid haformaficn which are the proprietary and exdus Fre property of the National.. Crwru9[ an Caaey]ensatan Insurance. inc. (NCCI). No turtner use. dieseinnatfpn: save: t•ansfer, assignment or disposition of this product, in erriPe or in pit, may be marls velth hit the prior written consent of NCCI. This prod Is furnished 'As is' `As avarable With all defects" and Includes information available at the time of publicaton only. NCO mattes no represenfalions or Wa?ranbes of arty bred re4lingto the prodVGt and hereby expressly dsdairrs arty and ail express: stalutcry. or implied warrantless, incluang the implied warranty of rnerchantabiRy, finless fa' a trdrlina61r purpose, atturauy, rumple [emus, curremne:u,, or mrredness of any into,,,,lion nr prafua furnished hereunder.. All resprrnsi Lilt- for the tine of and for any :md iii rr: sult6 derived or obtained through the use of the predict are the and time's and NCCI shall not have any li lity thereto. • Total by Poll cy Year of atl cases S200C orless. 0 Disease Loss C catoslmpfax: i.lm E Employers Liability 1.cm'i KEx-*& diCxl COo3 rage At Limited toss ti 115E&FIW V- Page 301.3 Texas Mutual 5124/2016 7:39:15 AM PAGE 2/003 Fax Server WORKERS COMPENSATION EXPERIENCE RATING LW Risk Name: R & R PETRO SERVICE INC Rating Effective Date: 09/20/2016 B jx'ExCPss, El3 PI E.rscQs Tx:::-:.. ,.._._05 2;6511 Eltpectekf Losses Production Date: 04/1112016 Ex ?I fm • L:ncses 1ct t arc f; Cr s •1,685 ......_ ..... 1,834 A . CS7 1 Ex i'Rzcess (0)::Exp C1 ,hFt Lrisses (g E Lasses .05i 2.851 };Exp Prirn 1.ksses 4.65 1:834 i! I Act Exc Lnss 's {H:='Ij Risk ID: 420772130 State: TEXAS BalJas# tel ] E1cctsses .,::, ,110t2Pr1f1: l nc�ps "3 • . 1,336 Ballast: iH) Act Inc (.1) Act Prim LOSSPS L654PS:• 0 410 Primary 1_011e Actual 410 E p°cted Factors Stabilizing ")/ C' (1 -A+G 6,458 f3 atallc. (A) " (F) C'(1 A)+C (A)"(C) 0 S. 1,6 .4 26,458 143 K) Thtaia:. 26,868 28,435 RATING REFLECTS A DECREASE OF 70% MEDICAL ONLY PRIMARY AND EXCESS LOSS DOLLARS WHERE ERA 1S APPLIED, Carrier: 29939 - 000 Policy: 0001228740 Eft -Date: 09/20/2015 Exp -Date: 09/20/2016 *Copyright 19e3 -201r, 011 igiro rese•ved. This product :s cionipri1Gti9 or compilations and ininrrnation which rare the praprfelary and exclusive properly of the National Council on Compensation 3nsurar oe.:s•c. fNCCIj. Nc turiner use, dissemination, sae, transfer. sso primer:E or disposition o1 this product, in whole or in part, may be made without the prior written consent of NCC1. This produc- i; f.rrnishec'As .,s' 'As available.""lAfilh al defects • and Incudes information available at tt•e time of publication on:y NCC! makes no representations or war aniies o` any hind re atnp to the pioduct araC hereby expressly d:ee aims any and all express. sbaatury, o• inrp ied warranties, inciu:inp the i.rptied war rarity of merthanlabiky, fitness loot a particular ouroose, accuracy completeness, c,Jrreniness, cr earectness of any information er p. educt Euriiehed Hereunder. A® responsibihy for the use of and For any and all reertfts derived or obtained IIreugh he use of the product are the end users and NCC/ shall Hol have erry liability thereto. V - Pagel oft Texas Mutual 5/24/2016 7:39:15 AM PAGE 3/003 Fax Server 42 -TEXAS WORKERS COMPENSATION EXPERIENCE RATING Risk Name: A & R PETRO SERVICE INC Rating Effective Dale: 09/20/2016 Risk ID: 420772130 Production Date: 04/11/2016 Stale: TEXAS Firm ID: Firm Name: R & R PETRO SERVICE INC Carrier: 29939 Policy tJo. 0001226740 Eff Date: 09202112 Gild1""'EL "D"" P6f1yldit E3pPr9n: [WM Udia" Ratioi iii]Ls 3724 177 391 losmg• s; ,.301 7 --------------- 5191 I 77 40 122.560 1 6219 1 •:1) .39 5,155 8810 I .06 .39 45,705 27 11 331 132 36 Policy Total: 280,0661Prentlura: Subject 8,243 Exp Date: 1710.712712 ..... : ::..... ........ ........ Total Act Inc Losses: 887 42 -TEXAS Carrier: 29939 3724 1.22 5191 6219 .39 .27 .40 :1.80 .89 Firm ID: Firm Name: IR & R PETRO SERVICE INC Policy No. 0001228740 51,941' 1. .634 149,9161 Eft Date: 09/20/2013 405 162 557 8809 .06 .35 45.„793 27 9 8810 06 39 47,337 28 11 Subject Policy Total: 325,9521Premium: 8,527 Exp Date: 09/202014 Total Act Inc Losses: 42 -TEXAS Firm ID: Firm Name: R & R PETRO SERVICE INC Carrier: 29939 iicE0RiG GD- PoliryNo. 0001228740 Eff Dote: 09/20/2014 Exp Date: 09/20.2015 EAp 3724 1.22 .39 H : :772.:301 519 .27 .40 138.122 373 149 6219 1.80 .39 3,463. 62 24 1000943903 06 13. 7 729 8809 .06 .35 62,400 37 13 8810 63,720 15 : Subject Total Act Inc Policy Total: 330,996 Premium : 6,213 Losses: 729 Copyho 6„ All fights reserved. This product ,s comprised of compilations arid in FCAntaticit NvnicP..p.ra e pFOp(:E.1r 4e.qclusive riedpertv Natiposi ecur.si Campo risadn :Insurance. Inc. 1:hiccg. No. f unhcif uise, dissemination, said iransfol, assonrherit. or disposition cf this product. •nsholg O i par. mai be made 1I]CL[J prior tn consent of NC Cl. This product Is ftwitisheo 'As is" 'As available" "WM all detests- and lac iudes infoonation avahans at the time of publat-on on:NCC! maims no representations or vrai''anties df any kind raintan h tie product and hereby expressly 6a -claims any end ell ei,ipriase steli,t0ri. 0, imciied ',warranties, E,141.1ing the in -piled Ara r Rut/ c,f raerchantegiln*.y ttnaas for a pialit1.1 curt:use: actil:acy, coripEetopoes, our ValifiElkti. Jr oor(iIrlrleka; t)( tiny irilo trod p-tydu:;3 bv•listed lb! i'es otn la* for fire rise of anti far artymid ee suite cleaved or ohtstnedtbreugh Me, used the preanct are 1N end users and N.001 shall not have any ieiJiI.J..triatit. ty Poli:y Year of MI cases ti2Ot30 of less. D Dense Loss C cai&;troptlit: E Emplutycurt Liability LCkes xfx-h.deoic...ei Govag LJ USL&HW *Lfroilecf 0S4; V - Page 2 of 2 Form 301 (Revised 05/11) Submit in duplicate to: Secretary of State P.O. Box 13697 Austin, TX 78711-3597 512 463-5555 FAX: 512/463-5709 Filing Fee: $750 Application for Registration of a Foreign For -Profit Corporation This space reserved for office use. FILED In the Office of the Secretary of Sti?te of Texas NOV 0 6 2013 Corporations Section 1. The entity is a foreign for-profit corporation. The name of the entity is: American Process Group Inc Provide theft!! legal name of the entity as stated in rhe amity `s formation document in itsjaarisdiction of formation. 2A. The name of the corporation in its jurisdiction of formation does not contain the word "corporation," "company, "incorporated," Dr "limited" (or an abbreviation thereof). The name of the corporation with the word or abbreviation that it elects to add for use in Texas is: 2B. The corporation name is not available in Texas. The assumed name under which the corporation will qualify and transact business in Texas is: The assumed name must include an acceptable organisational identifier or ern accepted abbreviation of one of these terms. 3. Its federal employer identification number is: 98-0445155 ❑ Federal employer identification number information is not available at this time. 4_ It is incorporated under the laws of: (set forth state or foreign eomary) DE and the date of its formation in that jurisdiction is: 10/26/2004 mm/ddlyvyv 5. As of the date of filing, the undersigned certifies that the foreign corporation currently exists as a valid corporation under the laws of the jurisdiction of its formation. 6_ The purpose or purposes of the corporation that it proposes to pursue in the transaction of business in Texas are set forth below. Environmental Services The corporation also certifies that it is authorized to pursue such stated purpose or purposes in the state or country under which it is incorporated_ 7. The date on which the foreign entity intends to transact business in Texas, or the date on which the foreign entity first transacted business in Texas is: 11/0412013 rramiddl'yy;y Late fees may apply (see instructions). 8. The principal office address ofthc corporation is: 10613 W. Sam Houston Pkwy: N., Ste. 300 Houston, TX 77064 Address City Farm 301 5 Sate Country ZipCode jI Ij[j ifrf t ['art �' f .. 1` li I E S;I � t f� � = Ear lh1[f1 " ,.1.l :tl [7a'. 1` �•s _ •t i' h Complete item 9A or 913, but not bg11 Complo:n item 9C. u 9A. The initial registered agent is an organization (cannot be entity named above) by the name of: Corporation Service Company dlbla CSC -Lawyers Incorporating Service Company OR El 913. The initial registered agent is an individual resident of the state whose name is: First Name M.I. Last Name 9C. The business address of the registered agent and the registered office address is: 211 E. 7th Street, Suite 620, Austin Street Address City Suffix TX 78741-3218 State Zip Cade 10. The corporation hereby appoints the Secretary of State of Texas as its agent for service of process under the circumstances set forth in section 5.251 of the Texas Business Organizations Code_ 11. The name and address of each person on the board of directors is: Director 1 • . Mery Swan First Nana 10613 W. Sam Houston Pkwy. N. , Ste. 300 M.1. Last Name Houston, TX 77064 Suffer Street or Mailing Address City State Country Zip Code ' Director 2 • . John W. Gibson Jr. First Name M.I. 500, 140 10th Avenue S.E. Calgary, Canada AE T2G 0R1 Last Name $uf .i Street or Mailing Address City Stare Court try Zip Code Director 3 Timothy Sturm First Name M.1. 10613 W. Sam Houston Pkwy. N., Ste. 300 Houston, TX last Name 77064 Suffix Smeet or Mailing Address City State Country Z p Code Supplemental Provisions/Information Text Area: ff1 a attached addendum, if any, is incorporated herein by reference_] Form 30i 6 Effectiveness of Filing (select either A, 8, or C.) A. ® This document becomes effective when the document is filed by the secretary of state. B. ❑ This document becomes effective at a later date, which is not more than ninety (90) days from the date of signing. The delayed effective date is: c. ❑ This document Lakes effect upon the occurrence of a future event or fact, other than the passage of time. The ge day after the date of signing is: The following event or fact will cause the document to take effect in the manner described below: Execution The undersigned affirms that the person designated as registered agent has consented to the appointment. The undersigned signs this document subject to the penalties imposed by law for the submission of a materially false or fraudulent instrument and certifies under penalty of perjury that the undersigned is authorized under the provisions of law governing the entity to execute the filing instrument. Date: 11/4/13 Signature of authorized person (see insetuctions) biAiam P_ tflobe.,\ Printed or typed name ofauthor/m=1 person. Form 3O] 7 Form 401-A (Revised 12/09) Acceptance of Appointment and Consent to Serve as Registered Agent §5.201(b) Business Organizations Code The following form may be used when the person designated as registered agent in a registered agent filing is an individual. Acceptance of Appointment and Consent to Serve as Registered Agent I acknowledge, accept and consent to my designation or appointment as registered agent in Texas for Name of represented entity 1 am a resident of the state and understand that it will be my responsibility to receive any process, notice, or demand that is served on me as the registered agent of the represented entity; to forward such to the represented entity; and to immediately notify the represented entity and submit a statement of resignation to the Secretary of State if 1 resign. X: Signapfre of registered eget Printed name G./registered agent Date (mmlddlyyyy) The following form may be used when the person designated as registered agent in a registered agent filing is an organization. Acceptance of Appointment and Consent to Serve as Registered Agent 1 am authorized to act on behalf of Corporation Service Company d/b/a CSC -Lawyers Incorporating Service Company Name of organization designated as registered agent The organization is registered or otherwise authorized to do business in Texas. The organization acknowledges, accepts and consents to its appointment or designation as registered agent in Texas for: AMERICAN PROCESS GROUP INC. Name ofrepresemed enrity The organization takes responsibility to receive any process, notice, or demand that is served on the organization as the registered agent of the represented entity; to forward such to the represented entity; and to immediately notify the r,: seek ed entity and submit a statement of resignation to the Secretary of State if the or anization r igns Form 401-A Brian Courtney, Asst. Vice President 11-5-2013 ho i d 1u act on behalf of organization Printed name of authorized person Dare (mmlddhyyry ) y d/b/a CSC -Lawyers Incorporating Service Company 3 Scope of Work American Process Group (APG) plans to provide all labor, materials, supplies, and equipment to remove 10,000 dry tons of alum backwash solids from lagoon 7 at the O.N. Stevens Water Treatment Plant in Corpus Christi, Texas. Mobilization and Placement of Dredge and Dewatering Equipment APG plans to utilize one VMI 615 dredge capable of pumping 1,200 gallons per minute (gpm) to remove solids from Lagoon 7. The dredge will be delivered to lagoon site on a flat-bed semi -truck and trailer, unloaded and placed in the lagoon with a 75 ton or greater crane. Off-loading and placement of the dredge in Lagoon 7 will be at the West corner of the lagoon near the Sludge Handling MCC. A truck and trailer load of 8" dredge pipe will also be delivered to Lagoon 7 area and unloaded. At the contractor staging area, APG will be mobilizing and setting up 3 large bowl Sharples centrifuges. capable of processing 200 - 250 gpm each, and ancillary equipment for the dewatering of the solids. This will be occurring at the same time as the dredge is being placed in Lagoon 7. APG will be coordinating approximately 13 semi -truck & trailer loads delivering all the necessary equipment to complete this project. The mobilization of all the equipment will require approximately 3 days to unload, setup and test run. The equipment at the dewatering area will require a 75' by 125' area with an additional 80' x 80' area that will have ecology blocks on three sides to temporarily stockpile the dewatered solids before being hauled to the landfill. Cattail Removal APG plans to use an amphibious and standard long reach excavator to remove the cattails from Lagoon 7. The amphibious excavator will operate on the cattails and solids in the lagoon to remove the vegetation and place it close to the bank. Another excavator on shore will then reach with a claw and thumb to remove the vegetation, place it on the shore to drain. Once allowed to drain, the cattails will be loaded into trucks for transportation across IH37 to the Polywog Ponds for final disposal. Dredging Operation Plan APG plans to remove the slurry from the ASB with a VMI high volume cutter head style auger dredge. The dredge has an 8' cutter head that is mounted on the Q.N. Stevens Water Treatment Plant Intermediate Sludge Removal November 30, 2016 - Page 1 end of a hinged boom that can be lowered to the depth of the solids. The cutter head augers the material to the dredge pump which transports the slurry through an 8 -inch pipe and then discharges into a screening tank at the processing setup area. The dredge will be controlled using a main cable driveline that will cross Lagoon 7. The main dredge cable will be attached to a looped or Wrier cable that is anchored to 2 sets of ecology blocks on two sides of the lagoon. With this configuration, APG will be able to move the dredge over in 6' increments allowing for a 2' overlap in removing the solids. Protection of the liner will be of the utmost importance to APG. With the current levels of solids being over 14 feet above the sunken center dike, APG does not anticipate encountering the bottom of Lagoon 7. When dredging, operations begin to get close to the banks, wheels will be placed on both ends of the auger head to prevent it from encountering the liner. APG plans dredge directionally from the Southwest side to the Northeast side of lagoon 7 to remove the solids. The focus will be on the Northeastern side originally where the solids have been exposed on the surface and the cattails are present. All of APG's equipment is maintained on a regular scheduled basis and reviewed prior to each project. Should anything brake or get damaged APG will repair immediately to minimize any downtime of the dredge that would affect the project completion. APG has 2 VMI 615 dredges in our fleet, so should a catastrophic event occur to the dredge on this project the second dredge will be mobilized and begin production as soon as possible. Dewatering Operation Plan The dredge pipe transporting the solids to the dewatering equipment at the contractor staging area will run southwest up the existing non-paved/non-gravel road near the wash water return pump station. The slurry will be pumped directly into an 18,000 gallon sludge screening tank. The screening tank will remove debris and will serve as a process buffer between the dredging or pumping and the dewatering to allow for optimization of both. The screening tank is agitated to keep the slurry consistent. The slurry will be drawn from the screening tank and pumped to the centrifuges via Variable Frequency Drive (VFD) driven feed pumps. The VFD allows for regulated speed control of the feed pumps and therefore variable pumping rate to the centrifuges. Each centrifuge has its own feed pump to allow for process optimization of each centrifuge individually. Q.N. Stevens Water Treatment Plant Intermediate Sludge Removal November 30, 2016 - Page 2 A polymer make down system allows for the mixing and hydration of polymer flocculent that will be used to aid the separation process. The hydrated and aged polymer is metered using a VFD driven positive displacement pump. The VFD permits the precise flow and regulation of the polymer so that the correct dose is added for optimal separation while minimizing waste. The slurry and polymer flow will both be measured using magnetic flow meters and the polymer will be added to the slurry with a static in-line mixer to blend the two. The polymerized slurry will then be injected into the centrifuge where the separation will take place. The centrifuge has two main elements, a bowl that provides the mechanical separation and a scroll conveyor inside the bowl that augers the solids portion to the solids discharge end of the machine. The scroll conveyor is coupled through a planetary gearbox to the back drive motor. The bowl motor and back drive motor are both VFD driven. For the bowl this means that the amount of separation force, or "G" force is controllable by varying the bowl speed. Varying the back drive speed controls how quickly the material is augured out of the bowl, which is used to achieve a balance of optimum cake dryness and polymer dosage. All of APG's centrifuges are controlled with an industry leading, in-house developed control system. This system incorporates all functions of the centrifuge and intelligently controls pumping rates of slurry and polymer, back drive motor speed and other process elements based on operator input. With this system, APG can maximize centrifuge throughput, cake dryness, and a capture rate of 95% or greater while minimizing polymer dosage. The cake or solids portion will drop onto a horizontal belt conveyor and be conveyed to the stockpile area adjacent to the dewatering pad for temporary staging before being loaded into trucks for transportation to the Cefe Valenzuela landfill for disposal. The centrate or liquid portion will exit out the opposite end of the centrifuges and will drain by gravity into a tank. The centrate then be pumped back down the existing non paved/non gravel road to Lagoon 7. The exact discharge point will be determined once the project starts and the hydraulics of Lagoon 7 are understood better to minimize disturbance of the lagoon solids. Schedule & Personnel On -Site APG plans to operate 24 hours per day, 7 days per week for the dredging & Dewatering operations. There will be two shifts consisting of a dredge operator, two centrifuge technicians, and a polymer technician/shore watch. The site superintendent will be the on-site representative to the plant. He will be on-site during the day and available by phone 24 hours per day. APG will produce an Q.N. Stevens Water Treatment Plant Intermediate Sludge Removal November 30, 2016 - Page 3 average of 150 dry tons (500 - 600 wet tons) to be transported to the landfill each operating day. Hauling APG subcontractor plans to use End Dump trailer configurations hauling 24 -tons to transport the dewatered sludge to the landfill Monday thru Saturday each week. The trucks will enter and leave the through the existing gates at the midpoint of the staging area off Hearn Road. The trucks will be loaded with a front-end loader as they arrive and immediately go to the landfill. 4 to 5 individual trucks transporting a total of 22 - 26 loads each day. All samples for paint filter and composite solids testing will be collected at the staging area as the trucks are loaded. The trucks will transport the sludge on one of two routes to the Cefe Valenzuela Landfill. 1) Hearn Rd, South on Callicoatte Rd/FM 1694, East on FM 665, South on County Rd 61 and West on County Road 20. 2) Hearn Rd, West on Leopard ST, South on I-69E/L1S77, East on TX -44, South on FM 1694, East on FM 665, South on County Rd 61 and West on County Road 20. APG E M R APG's current EMR rating is 1.0. We cannot provide previous year's EMR ratings because APG was part of a larger corporation that did not track the EMR for individual divisions. We would gladly discuss our safety programs and procedures with the City of Corpus Christi should we be the apparent low bidder as our personnel have been performing this work for the last 10 years. O.N. Stevens Water Treatment Plant Intermediate Sludge Removal November 30, 2016 - Page 4 00 30 05 City of Corpus Christi Disclosure of Interest SUPPLIER NUMBER TO BE ASSIGNED BY Cl fY = PURCHASING DIVISION City of CITY OF CORPUS CHRISTI C CUs DISCLOSURE OF INTEREST Chnsti City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the City to provide the following information. Every question must be answered. If the question is not applicable, answer with "NA". See reverse side for Filing Requirements, Certifications and definitions. COMPANY NAME: American Process Group Inc. P. O. BOX: STREET ADDRESS: 1201 Pacific Ave., Suite 600 FIRM IS: 1. Corporation 4. Association a CITY: Tacoma, WA ZIP: 98402 - 2. Partnership 5.Other 3. Sole Owner 0 DISCLOSURE QUESTIONS If additional space is necessary, please use the reverse side of this page or attach separate sheet. 1. State the names of each `employee" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Job Title and City Department (if known) NIA 2. State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name N/A Title 3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Board, Commission or Committee N/A 4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an "ownership interest" constituting 3% or more of the ownership in the above named "firm." Name Consultant N/A City of Corpus Christi Disclosure of interest 003005-1 Rev 01-13-2016 FILING REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof, you shall disclose that fact in a signed writing to the City official, employee or body that has been requested to act in the matter, unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2-349 (d)] CERTIFICATION I certify that all information provided is true and correct as of the date of this statement, that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi, Texas as changes occur. Certifying Person: Colleen Prince (Type or Print) Signature of Certifying Person: CPU', Title: Vice President DEFINITIONS Date: November 30, 2016 a. "Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi, Texas. b. "Economic benefit". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantiae segment thereof. c. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part- time basis, but not as an independent contractor. d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self-employed person, partnership, corporation, joint stock company, joint venture, receivership or trust, and entities which for purposes of taxation are treated as non-profit organizations. e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of Corpus Christi, Texas. f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies, or special terms of venture or partnership agreements." g. "Consultant." Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation. City of Corpus Christi Disclosure of Interest 003005-2 Rev 01-13-2016 00 52 23 AGREEMENT This Agreement, for the Project awarded on December 20, 2016, is between the City of Corpus Christi (Owner) and American Process Group, Inc. (Contractor). Owner and Contractor agree as follows: ARTICLE 1— WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as: O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 City Project No. E16246 ARTICLE 2 — DESIGNER AND OWNER'S AUTHORIZED REPRESENTATIVE 2.01 The Project has been designed by: LNV, Inc. 801 Navigation Blvd., Suite 300 Corpus Christi, Texas, 78408 2.02 The Owner's Authorized Representative for this Project is: Wayne Otto, P.E. — Acting Construction Engineer City of Corpus Christi — Engineering Services 4917 Holly Rd., #5 Corpus Christi, TX 78411 ARTICLE 3 — CONTRACT TIMES 3.01 Contract Times A. The Work is required to be substantially completed within 365 days after the date when the Contract Times commence to run as provided in the Notice to Proceed and is to be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 395 days after the date when the Contract Times commence to run. B. Milestones, and the dates for completion of each, are as defined in SECTION 0135 00 SPECIAL PROCEDURES. 3.02 Liquidated Damages A. Owner and Contractor recognize that time limits for specified Milestones, Substantial Completion, and completion and readiness for Final Payment as stated in the Contract Documents are of the essence of the Contract. Owner and Contractor recognize that the Owner will suffer financial loss if the Work is not completed within the times specified in Agreement 00 52 23 - 1 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev06-22-2016 Paragraph 3.01 and as adjusted in accordance with Paragraph 11.05 of the General Conditions. Owner and Contractor also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty): 1. Substantial Completion: Contractor shall pay Owner $0.00 for each day that expires after the time specified in Paragraph 3.01 for Substantial Completion until the Work is substantially complete. 2. Completion of the Remaining Work: Contractor agrees to pay Owner $0.00 for each day that expires after the time specified in Paragraph 3.01 for completion and readiness for final payment until the Work is completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions. 3. Liquidated damages for failing to timely attain Substantial Completion and Final Completion are not additive and will not be imposed concurrently. 4. Milestones: Contractor agrees to pay Owner liquidated damages as stipulated in SECTION 01 35 00 SPECIAL PROCEDURES for failure to meet Milestone completions. 5. The Owner will determine whether the Work has been completed within the Contract Times. B. Owner is not required to only assess liquidated damages, and Owner may elect to pursue its actual damages resulting from the failure of Contractor to complete the Work in accordance with the requirements of the Contract Documents. ARTICLE 4 — CONTRACT PRICE 4.01 Owner will pay Contractor for completion of the Work in accordance with the Contract Documents at the unit prices shown in the attached BID FORM. Unit prices have been computed in accordance with Paragraph 13.03 of the General Conditions. Contractor acknowledges that estimated quantities are not guaranteed, and were solely for the purpose of comparing Bids, and final payment for all unit price items will be based on actual quantities, determined as provided in the Contract Documents. Total Base Bid Price $ 3,750,000.00 ARTICLE 5 — PAYMENT PROCEDURES 5.01 Submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by the OAR as provided in the General Conditions. 5.02 Progress Payments; Retainage: A. The Owner will make progress payments on or about the 25th day of each month during performance of the Work. Payment is based on Work completed in accordance with the Schedule of Values established as provided in the General Conditions. Agreement O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 005223-2 Rev 06-22-2016 B. Progress payments equal to 95 percent of the total earned value to date for completed Work and properly stored materials will be made prior to Substantial Completion. The balance will be held as retainage. C. Payment will be made for the amount determined per Paragraph 5.02.B, less the total of payments previously made and less set -offs determined in accordance with Paragraph 15.01 of the General Conditions. D. At the Owner's option, retainage may be required at a higher percentage rate if progress on the Project is considered to be unsatisfactory. If retainage in excess of the amount described above is held prior to Substantial Completion, the Owner will place the additional amount in an interest bearing account. Interest will be paid in accordance with Paragraph 6.01. E. At the Owner's option, Owner may pay Contractor 100 percent of the Work completed, less amounts withheld in accordance with Paragraph 15.01 of the General Conditions and less 200 percent of OAR's estimate of the value of Work to be completed or corrected to reach Substantial Completion. Owner may, at its sole discretion, elect to hold retainage in the amounts set forth above for progress payments prior to Substantial Completion if Owner has concerns with the ability of the Contractor to complete the remaining Work in accordance with the Contract Documents or within the time frame established by this Agreement. Release or reduction in retainage is contingent upon and consent of surety to the reduction in retainage. 5.03 Owner will pay the remainder of the Contract Price as recommended by OAR in accordance with Paragraph 15.06 of the General Conditions upon Final Completion and acceptance of the Work. ARTICLE 6 — INTEREST ON OVERDUE PAYMENTS AND RETAINAGE 6.01 The Owner is not obligated to pay interest on overdue payments except as required by Texas Government. Code Chapter 2251. 6.02 The Owner is not obligated to pay interest on moneys not paid except as provided in Texas Government Code Chapter 2252. ARTICLE 7 — CONTRACTOR'S REPRESENTATIONS 7.01 The Contractor makes the following representations: A. The Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. The Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. The Contractor is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work. D. The Contractor has carefully studied the following Site -related reports and drawings as identified in the Supplementary Conditions: 1. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; Agreement 00 52 23 - 3 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) Rev06-22-2016 2. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; 3. Underground Facilities referenced in reports and drawings; 4. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and 5. Technical Data related to each of these reports and drawings. E. The Contractor has considered the: 1. Information known to Contractor; 2. Information commonly known to contractors doing business in the locality of the Site; 3. Information and observations obtained from visits to the Site; and 4. The Contract Documents. F. The Contractor has considered the items identified in Paragraphs 7.01.D and 7.01.E with respect to the effect of such information, observations, and documents on: 1. The cost, progress, and performance of the Work; 2. The means, methods, techniques, sequences, and procedures of construction to be employed by Contractor; and 3. Contractor's safety precautions and programs. G. Based on the information and observations referred to in the preceding paragraphs, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. H. The Contractor is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. I. The Contractor has correlated the information known to the Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. J. The Contractor has given the OAR written notice of all conflicts, errors, ambiguities, or discrepancies that the Contractor has discovered in the Contract Documents, and the written resolution provided by the OAR is acceptable to the Contractor. K. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. L. Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. Agreement O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 005223-4 Rev 06-22-2016 ARTICLE 8 — ACCOUNTING RECORDS 8.01 Accounting Record Availability: The Contractor shall keep such full and detailed accounts of materials incorporated and labor and equipment utilized for the Work consistent with the requirements of Paragraph 13.01 of the General Conditions and as may be necessary for proper financial management under this Agreement. Subject to prior written notice, the Owner shall be afforded reasonable access during normal business hours to all of the Contractor's records, books, correspondence, instructions, drawings, receipts, vouchers, memoranda, and similar data relating to the Cost of the Work and the Contractor's fee. The Contractor shall preserve all such documents for a period of 3 years after the final payment by the Owner. ARTICLE 9 — CONTRACT DOCUMENTS 9.01 Contents: A. The Contract Documents consist of the following: 1. Specifications, forms, and documents listed in SECTION 00 0100 TABLE OF CONTENTS. 2. Drawings listed in the Sheet Index. 3. Addenda. 4. Exhibits to this Agreement: a. Contractor's Bid Form. 5. Documentation required by the Contract Documents and submitted by Contractor prior to Notice of Award. B. There are no Contract Documents other than those listed above in this Article. C. The Contract Documents may only be amended, modified, or supplemented as provided in Article 11 of the General Conditions. ARTICLE 10 — CONTRACT DOCUMENT SIGNATURES One original of the signed Agreement will be required. The sequence of signatures will be completed in the following order: A. CONTRACTOR — Agreement must be signed by a person authorized to bind the firm or company. If Contractor is a Corporation, agreements must be Attested; B. ASSISTANT CITY ATTORNEY for the City; C. DIRECTOR OF ENGINEERING SERVICES; D. CITY SECRETARY for the City Agreement O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 005223-5 Rev 06-22-2016 ATTEST DigItay signed by A,euecce Huerta ON: rn42ebeoos Hasan, o, ou, emelt=renes uxeree.mn, c=US Late: 2017.01 .17 12:57:51 -06'00. Rebecca Huerta City Secretary APPROVED AS TO LEGAL FORM: Aimee Alcom-Reed ' 2017.01.09 16:56:05 -06'00' Janet L. Kellogg Assistant City Attorney ATTEST (IF CORPORATION) Si d n i e Smith Date:1201i T01tl05 13131 38 07 00' (Seal Below) Note: Attach copy of authorization to sign if person signing for CONTRACTOR is not President, Vice President, Chief Executive Officer, or Chief Financial Officer CITY OF CORPUS CHRISTI Digdally signed by .ieft Edmonds DN: on=Jett Edmonds, o, ou=Enge,eering, ametlyeffreye eaes.00m, c=LIS Date: 2017:01.11 11:42:50 J.H. Edmonds, P.E. Director of Engineering Services M2016-168 BY COUNCIL 12/20/16 RH/ML AUTHORIZED Digitally signed by RH/ML Date: 2017.01.17 11:37:07 -06'00' CONTRACTOR American Process Group, Inc. By: Title: John Prince Digitally signed by John Prince Date: 2017.01.05 08:42:53 -07'00' President 1201 Pacific Ave., #600 Address Tacoma, Washington 98402 City State 780/963-1484 Zip Phone Fax j prince@a mprocessgrou p.com EMail END OF SECTION Agreement O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 (Project No. E16246) 005223-6 Rev 06-22-2016 Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.277 CERTIFICATE OF INTERESTED PARTIES FORM 1295 1 of 1 Complete Nos. 1- 4 and 6 if there are interested parties. Complete Nos. 1, 2, 3, 5, and 6 if there are no interested parties. OFFICE USE ONLY CERTIFICATION OF FILING Certificate Number: 2016-141575 Date Filed: 11/30/2016 Date Acknowledged: ,A &1 Aimee AlcornReed (Y 01J010916:53:03-Ofi00' 1 Name of business entity filing form, and the city, state and country of the business entity's place of business. American Process Group Inc. Tacoma, WA United States 2 Name of governmental entity or state agency that is a party to the contract for which the form is being filed. City of Corpus Christi 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract, and provide a description of the services, goods, or other property to be provided under the contract. Project No. E16246 ON Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 4 Name of Interested Party City, State, Country (place of business) Nature of interest (check applicable) Controlling Intermediary 5 Check if there is NO Interested Party. only X 6 AFFIDAVIT I swear, or affirm, under penalty of perjury, that the above disclosure is true L/PA t n/ n1 PIiCc V i'u 4_ 1 and correct. 2X, R = A Signature of authorized agent of contracting business entity AFFIX NOTARY STAMP / SEAL ABOVE Sworn to and subscribed before me, by the said '_'%.L--e�-i�'� JL i_ this the / day of ee e✓"r her 20 1 L , to certify which, witness my hand and seal of office. 7€1.- -t-he .0mu..tce- ,.;f Fl-tbe, tel -4Jed- -*- —lama -_—_____„________ \JItA b-wzo Signature o'officer ari'inistering oath Printed name of officer administering oath Title of officer administering oath Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.277 Sylvia Arriaga From: Sent: To: Cc: Subject: Attachments: Hi Sylvia, p (-d15 5f,f4 4d/boo( Kristina Kulak <KKulak@mhkinsurance.com> Wednesday, January 04, 2017 3:11 PM Sylvia Arriaga Lisa Berg; Dean Marchon; 'ssmith@amprocessgroup.com'; Melanie Gavlik; Jeffrey Edmonds; 'cprince@amprocessgroup.com'; Melanie Gavlik; Jerry Shoemaker RE: Proj E16246 O.N.Stevens Sludge Removal Corpus Christi TX - Stevens Water Treatment Plant.pdf -4i/111/1 ik)t A'4 '60 (64%j° As the Installation Floater is no longer required, please find attached the certificate you had requested. Policy documents that you had required have already been requested from the insurance company and are expected shortly. They will be forwarded upon receipt. Please find attached the certificate evidencing coverage in the interim. Ire E- b0(.4 Thanks, a1R- �,�/,/�f 9 f d ..0.1141101 /t.'moi '4 a[.�� Kristina Kulak "`"_( Account Manager, Commercial Client Services MHK Insurance — Brokers & Risk Advisors 12316 -107 Avenue, Edmonton, AB T5M 1Z1 www.mhkinsurance.com Follow us on Facebook, Twitter and Linkedln D 587.525.6038 T 780.454.9363 TF 877.454.9363 F 780.452.6095 E kkulak@mhkinsurance.com We believe in Alberta and the power of those entrepreneurs, innovators, and families that make it what it is. Contact us today about your personal and commercial insurance needs. If you receive this communication in error, please notify us by return e-mail or, alternatively, destroy this message. MHK Insurance complies with Canada's Anti -Spam Legislation and Alberta's Personal Information Protection Act. If you no longer wish to receive emails from MHK, please reply with Unsubscribe in the subject line. Thank you. From: Dean Marchon Sent: Wednesday, January 4, 2017 1:38 PM To: Kristina Kulak <KKulak@mhkinsurance.com> Cc: Lisa Berg <LBerg@mhkinsurance.com>; Tammy Hubbel <THubbel@mhkinsurance.com> Subject: FW: Proj E16246 O.N.Stevens Sludge Removal Hi Kristina. Please see email below from Sylvia at the City of Corpus Christi. No need for the installation floater. Please send the cert and add in a note that the required endorsements have been requested from the insurer and will be sent as soon as we are in receipt of them. Thanks for your help, Dean Dean Marchon, CRM Director, Commercial Markets & Senior Client Executive, Commercial Lines MHK Insurance — Brokers & Risk Advisors 1 MHK INSURANCE CERTIFICATE OF INSURANCE This is to certify that policies of insurance as herein described have been issued to the insured named below and are in force at this date. The insurance afforded is subject to the terms, conditions, and exclusions of the applicable policy. CERTIFICATE HOLDER: City of Corpus Christi, Texas Project E16246 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Ph 2 PO Box 9277 Corpus Christi, TX 78469-9277 INSURED: American Process Group, Inc. 946 Boulder Blvd Stony Plain, AB T7Z 0E6 TYPE INSURER & POLICY EXPIRY DATE COVERAGE LIMIT OF LIABILITY Workers Compensation & Employer's Liability Liberty Mutual Insurance Company/ Policy No. WC2-B71-170529-011 April 19, 2017 f Texas Workers Compensation Bodily Injury by Accident Bodily Injury by Disease Statutory USD $1,000,000 Each Accident USD $1,000,000 Each Employee USD $1,000,000 Policy Limit Commercial General Liability Liberty Mutual Insurance Company Policy No. TB1-B71-171138-016 April 19, 2017 / V Bodily Injury and Property Damage Products and Completed Operations USD $2,000,000 Each Occurrence USD $5,000,000 Aggregate USD $2,000,000 Each Occurrence USD $2,000,000 Aggregate Non -Owned Automobile Including SEF96 Contractual Liability and SEF99 Long Term Leased Vehicle Exclusion Liberty Mutual Insurance Company Policy No. 1000211723-01 April 19, 2017 V Bodily Injury and Property Damage SEF94 Legal Liability for Damage to Hired Automobiles CAD $2,000,000 Each Occurrence CAD $75,000 Limit Contractor's Pollution Liability Liberty Mutual Insurance Company Policy No. UB1T01ABATH7116 April 19, 2017 `1 Limit of Liability CAD $2,000,000 Each Occurrence CAD $4,000,000 Aggregate EDMONTON 12316 -107 Avenue, Edmonton, Alberta TSM 1Z1 T 780.454.9363 • TF 877.454.9363 • F 780.452.6095 edmonton@mhkinsurance.com CALGARY 320, 295 Midpark Way SE, Calgary, Alberta T2X 2A8 T 403.255.3050 • TF 866.249.7940 • F 403.259.2394 calgary©mhkinsurance.com BONNYVILLE 4816 - 50 Avenue, PO Box 7116. Bonnydee, Alberta T9N 2114 T 780.826.6963 • TF 877.454.9363 • F 780.452.6095 bonnyville@mhkinsurance.com MHK INSURANCE Brokers & Risk Advisors Workers Compensation & Employer's Liability Policy# WC2-B71-170529-01, Commercial General Liability Policy# TB1-B71- 171138-016. Contractors Pollution Liability and Hired/Non-Owned Automobile Policy #1000211723-01: Additional Insured: City of Corpus Christi, but only with respect to liability arising out of the named insured's operations. It is further understood and agreed that the Insurer will endeavour to mail to the certificate holder 30 (thirty) days written notice of cancellation of this policy, but assumes no responsibility for failure to do so. It is hereby understood and agreed that the insurer waives its right of subrogation in favor of the City of Corpus Christi, but only with respect to liability arising out of the operations of the Named Insured Date: December 23, 2016 EDMONTON 12316 -107 Avenue, Edmonton, Alberta T5M 1Z1 T 780.454.9363 • TF 877.454.9363 • F 780.452.6095 ectrnonton@rnhkinsurance.com MHK Insurance Inc. Per: CALGARY 320, 295 Midpark Way SE, Calgary, Alberta T2X 2A8 T 403.255.3050 • TF 866.249.7940 • F 403.259.2394 calgary@rnhkinsurance.com BONNYVILLE 4816 - 50 Avenue, PO Box 7116, Bonnyde, Alberta T9N 2114 T 780.826.6963 • TF 877.454.9363 • F 780.452.6095 bonnyvileerance.com POLICY NUMBER: TB1-B71-171138-016 COMMERCIAL GENERAL LIABILITY CG 2010 0413 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Or Organization(s) Location(s) Of Covered Operations City of Corpus Christi, Texas Project E16246 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Ph 2 PO Box 9277 Corpus Christi, TX 78469-9277 "As required by written contract or written agreement". Information required to complete this Schedule, if not shown above, will be shown in the Declarations. A. Section II — Who Is An Insured is amended to include as an additional insured the person(s) or organization(s) shown in the Schedule, but only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf; in the performance of your ongoing operations for the additional insured(s) at the location(s) designated above. However: 1. The insurance afforded to such additional insured only applies to the extent permitted by law; and 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. B. With respect to the insurance afforded to these additional insureds, the following additional exclusions apply: This insurance does not apply to "bodily injury" or "property damage" occurring after: 1. All work, including materials, parts or equipment furnished in connection with such work, on the project (other than service, maintenance or repairs) to be performed by or on behalf of the additional insured(s) at the location of the covered operations has been completed; or 2. That portion of "your work" out of which the injury or damage arises has been put to its intended use by any person or organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. CG 2010 0413 © Insurance Services Office, Inc., 2012 Page 1 of 2 C. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits Of Insurance: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement; or 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. Page 2 of 2 © ISO Properties, Inc., 2012 CG 2010 0413 Policy Number TB1-671-171138-016 Issued by Liberty Mutual Insurance Company THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. Change Endorsement Named Insured Endorsement number American Process Group Inc. 002 The following changes are effective as of the effective dates shown below and will terminate with the policy. All other provisions of the policy remain unchanged. Change Description 01/01/2017 General Liability Additional Insured — Owners, Lessees Or Contractors — Scheduled Person or Organization, Form CG 20 10 04 13, is being added to Inventory Coverage Forms/Parts, Endorsements, Enclosures, and this policy. In addition the following forms are added to your policy Form Number/Edition Date Title IC 99 99 07 09 Change Endorsement Issued: 12/30/2016 IC 99 99 07 09 © 2008, Liberty Mutual Group of Companies. All rights reserved. Page 1 of 1 00 72 01 INSURANCE REQUIREMENTS ARTICLE 1— INSURANCE REQUIREMENTS 1.01 CONTRACTOR'S INSURANCE AMOUNTS A. Provide the insurance coverage for at least the following amounts unless greater amounts are required by Laws and Regulations: Insurance Requirements O.N. Stevens Water Treatment Plant Intermediate Sludge Re` Phase 1(Project No. E16246) Type of Insurance Minimum Insurance Coverage Commercial General Liability including 1. Commercial Form 2. Premises — Completed Operations 3. Explosions and Collapse Hazard 4. Underground Hazard 5. Products / Completed Operations Hazard 6. Contractual Liability 7. Broad Form Property Damage 8. Independent Contractors 9. Personal & Advertising Injury $1,000,000 Per Occurrence $2,000,000 Aggregate Business Automobile Liability - Owned, Non Owned, Rented and Leased $1,000,000 Combined Single Limit Workers' Compensation Statutory Employer's Liability $500,000/ 500,000/ 500,000 Excess Liability/Umbrella Liability Required if Contract Price > $5,000,000 $1,000,000 Per Occurrence Contractor's Pollution Liability / Environmental Impairment Coverage Not limited to sudden and accidental discharge. To include long-term environmental impact for the disposal of pollutants/contaminants. Required if excavation > 3 ft $1,000,000 Per Claim // Required ❑ Not Required Builder's Risk (All Perils including Collapse) Required for vertical structures and bridges Equal to Full Replacement Cost of Structure and Contents ❑ Required ►ZI Not Required Installation FI•_ ___ `Required if installing city -owned equipme'4 Equal to Contract Price •v• 111 Not Required ADDENDUM #3 ATTACHM ENT #4 PAGE 1 OF 10 GUARANTEE' 00 6116 PAYMENT BOND BOND NO. ES1199779 Contractor as Principal Name: American Process Group, Inc. Mailing address (principal place of business): 1201 Pacific Ave., #600 Tacoma, Washington 98402 Owner Name: City of Corpus Christi, Texas Mailing address (principal place of business): Engineering Services 1201 Leopard Street Corpus Christi, Texas 78469 Contract Project name and number: E16246 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 Award Date of the Contract: December 20, 2016 Contract Price: $3,750,000.00 Bond Date of Bond: January 3, 2017 (Date of Bond cannot be earlier than Award Date of Contract) Surety Name:The Guarantee Company of North America USA Mailing address (principal place of business): Suite 1402, 10025 - 102A Avenue Edmonton, AB T5J 2Z2 Physical address (principal place of business): One Towne Square, Suite 1470 Southfield, MI 48076 Surety is a corporation organized and existing under the laws of the state of: Michigan By submitting this Bond, Surety affirms its authority to do business in the State of Texas and its license to execute bonds in the State of Texas. Telephone (main number): 780-424-2266 Telephone (for notice of claim): 780-424-2266 Local Agent for Surety Name:Gordon Selman Address: 2nd Flr, 12316-107 Ave NW Edmonton, AB T5M 1Z1 Telephone: 587-525-6075 Email Address: GSelman@mhkinsurance.com The address of the surety company to which any notice of claim should be sent maybe obtained from the Texas Dept. of Insurance by calling the following toll-free number: 1-800-252-3439 Excellence, Expertise, Experience ... Every time The Guarantee Company of North America USA One Towne Square, Suite 1470 Southfield, Michigan 48076 Tel 248-281-0281 • Fax 248-750-0431 • 1-866-328-0567 theguaranteeus.com Surety and Contractor, intending to be legally bound and obligated to Owner do each cause this Performance Bond to be duly executed on Its behalf by its authorized officer, agent or representative. The Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally to this bond. The condition of this obligation is such that if the Contractor as Principal faithfully performs the Work required by the Contract then this obligation shall be null and void; otherwise the obligation is to remain in full force and effect. Provisions of the bond shall be pursuant to the terms and provisions of Chapter 2253 and Chapter 2269 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter to the same extent as if it were copied at length herein. Venue shall lie exclusively in Nueces County, Texas for any legal action. Contractor as Principal American ocess Group, Inc. Signature: AA Surety The Guarantee Com. -ny of : orth America USA // Signature: k_/ Name: CP(j..JcL Name: Theresa Hedberg / Title: ti L Pe.f.--7 ) i],EJ r Title: Attorney -in -Fact Email Address: Cpr, v.C.ed3awl pro.cxSS5r- Email Address: (Attach Power of Theresa.Hedberg@theguarantee.com cow, _. _ Attorney and place surety seal below) JQ'wdTEE 0 z 0 _ Jco +CRTH A1�Rti`G END OF SECTION Performance Bond E16246 O.N.Stevens Wtr Treatment Plt Intermediate Sludge Removal Ph 1 006113-2 7-8-2014 GUARANTEE® The Guarantee Company of North America USA Southfield, Michigan POWER OF ATTORNEY NOW ALL BY THESE PRESENTS: That THE GUARANTEE COMPANY OF NORTH AMERICA USA, a corporation organized and existing under the laws of the State of Michigan, having its principal office in Southfield, Michigan, does hereby constitute and appoint Alex Campbell, Graham McIntosh, Irene LeBlanc, Theresa Hedberg, Dina Amaro -Elias, Richard Longland, Paul Hollingworth, Yves Boilard, Benoit Phenix, Nathalie Sanscartier, Cheryl Best -Pope, Olga lankine, Dan Fletcher, Michel Bourque, Max Fratarcangeli, Francois Forget, Steve Rees, Nelson de Quintal, Pamela Martin, Sean Deakin, Dana Hammond, Chelsea Fish, Richard Gray, Greg Forsythe, Jody Maillet, Korey Pettit, Stephen Jensen, Maryse Bertrand, Kim Roberts The Guarantee Company of North America its true and lawful attomey(s)-in-fact to execute, seal and deliver for and on its behalf as surety, any and all bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof, which are or may be allowed, required or permitted by law, statute, rule, regulation, contract or otherwise. The execution of such instrument(s) in pursuance of these presents, shall be as binding upon THE GUARANTEE COMPANY OF NORTH AMERICA USA as fully and amply, to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at the principal office. The Power of Attomey is executed and may be certified so, and may be revoked, pursuant to and by authority of Article IX, Section 9.03 of the By -Laws adopted by the Board of Directors of THE GUARANTEE COMPANY OF NORTH AMERICA USA at a meeting held on the 315' day of December, 2003. The President, or any Vice President, acting with any Secretary or Assistant Secretary, shall have power and authority: 1. To appoint Attomey(s)-in-fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the Company thereto, bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof; and 2. To revoke, at any time, any such Attomey-in-fact and revoke the authority given, except as provided below 3. In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and authority hereby given to the Attomey-in-Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. 4. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attomey-in-Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner — Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. Further, this Power of Attorney is signed and sealed by facsimile pursuant to resolution of the Board of Directors of the Company adopted at a meeting duly called and held on the 6th day of December 2011, of which the following is a true excerpt: RESOLVED that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any Power of Attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, contracts of indemnity and other writings obligatory in the nature thereof, and such signature and seal when so used shall have the same force and effect as though manually affixed. c EF IN WITNESS WHEREOF, THE GUARANTEE COMPANY OF NORTH AMERICA USA has caused this instrument to be signed and its corporate seal to be affixed by its authorized officer, this 2"° day of October, 2015. STATE OF MICHIGAN County of Oakland THE GUARANTEE COMPANY OF NORTH AMERICA USA M//L✓hei„/ Stephen C. Ruschak, President & Chief Operating Officer Randall Musselman, Secretary On this 2nd day of October, 2015 before me came the individuals who executed the preceding instrument, to me personally known, and being by me duly sworn, said that each is the herein described and authorized officer of The Guarantee Company of North America USA; that the seal affixed to said instrument is the Corporate Seal of said Company; that the Corporate Seal and each signature were duly affixed by order of the Board of Directors of said 4: Cynthia A. Takai Notary Public, State of Michigan County of Oakland My Commission Expires February 27, 2018 Acting in Oakland County IN WITNESS WHEREOF, I have hereunto set my hand at The Guarantee Company of North America USA offices the day and year above written. 4.,, a.-r�, I, Randall Musselman, Secretary of THE GUARANTEE COMPANY OF NORTH AMERICA USA, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney executed by THE GUARANTEE COMPANY OF NORTH AMERICA USA, which is still in full force and effect. IN WITNESS WHEREOF, I have thereunto set my hand and attached the seal of said Company this 3rd day of January, ?O17 Randall Musselman, Secretary THE GUARANTEE' 00 61 13 PERFORMANCE BOND BOND NO. ES1199779 Contractor as Principal Name: American Process Group, Inc. Mailing address (principal place of business): 1201 Pacific Ave., #600 Tacoma, Washington 98402 Owner Name: City of Corpus Christi, Texas Mailing address (principal place of business): Engineering Services 1201 Leopard Street Corpus Christi, Texas 78469 Contract Project name and number: E16246 O.N. Stevens Water Treatment Plant Intermediate Sludge Removal Phase 1 Award Date of the Contract: December 20, 2016 Contract Price: $3,750,000.00 Bond Date of Bond: January 3, 2017 (Date of Bond cannot be earlier than Award Date of the Contract) Surety Name: The Guarantee Company of North America USA Mailing address (principal place of business): Suite 1402,10025-102A Avenue Edmonton, AB T5J 2Z2 Physical address (principal place of business): One Town Square, Suite 1470 Southfield, MI 48076 Surety is a corporation organized and existing under the laws of the state of: Michigan By submitting this Bond, Surety affirms its authority to do business in the State of Texas, and its license to execute bonds in the State of Texas. Telephone (main number): 780-424-2266 Telephone (for notice of claim): 780-424-2266 Local Agent for Surety Name: Gordon Selman Address: 2nd Fir, 12316-107 Ave NW Edmonton, AB T5M1Z1 Telephone: 587-525-6075 Email Address: GSelman@mhkinsurance.com The address of the surety company to which any notice of claim should be sent may be obtained from the Texas Dept. of Insurance by calling the following toll-free number: 1-800-252-3439 ance Bond Excellence, Expertise, Experience ... Every tim Judge Removal PI The Guarantee Company of North America USA One Towne Square, Suite 1470 Southfield, Michigan 48076 Tel 248-281-0281 • Fax 248-750-0431 • 1-866-328-0567 theguaranteeus.com Surety and Contractor, intending to be legally bound and obligated to Owner do each cause this Payment Bond to be duly executed on its behalf by its authorized officer, agent or representative. The Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally to this bond. The condition of this obligation is such that if the Contractor as Principal pays all claimants providing labor or materials to him or to a Subcontractor in the prosecution of the Work required by the Contract then this obligation shall be null and void; otherwise the obligation is to remain in full force and effect. Provisions of the bond shall be pursuant to the terms and provisions of Chapter 2253 and Chapter 2269 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter to the same extent as if it were copied at length herein. Venue shall lie exclusively In Nueces County, Texas for any legal action. Contractor Signature: Name: Title: Email Address: as Principal Americ��33I� Qpcess Group, Inc. I -'Jut A JC_12 Surety the Guarantee Compan f No ) - rica USA Signature: CpC.-Lf-f� Pi? 4Cf— Name: Theresa Hedberg V iC_kt'( Sit) Title: Attorney -in -Fact L' pi1'Y cefolc tyr0ce sjrC:��f,, Email Address: (Attach Power Theresa.Hedberg@theguarantee.com `1 (11-'1' of Attorney and place surety seal below) Ji* C�'tt V 9 RTH AAE�ici 1. lis - \CJ A END OF SECTION Payment Bond Form E16246 O.N.Stevens Wtr Treatment Plt Intermediate Sludge Removal Ph 1 00 6116 - 2 7-8-2014 GUARANTEE® The Guarantee Company of North America USA Southfield, Michigan POWER OF ATTORNEY NOW ALL BY THESE PRESENTS: That THE GUARANTEE COMPANY OF NORTH AMERICA USA, a corporation organized and existing under the laws of the State of Michigan, having its principal office in Southfield, Michigan, does hereby constitute and appoint Alex Campbell, Graham McIntosh, Irene LeBlanc, Theresa Hedberg, Dina Amaro -Elias, Richard Longland, Paul Hollingworth, Yves Boilard, Benoit Phenix, Nathalie Sanscartier, Cheryl Best -Pope, Olga lankine, Dan Fletcher, Michel Bourque, Max Fratarcangeli, Francois Forget, Steve Rees, Nelson de Quintal, Pamela Martin, Sean Deakin, Dana Hammond, Chelsea Fish, Richard Gray, Greg Forsythe, Jody Maillet, Korey Pettit, Stephen Jensen, Maryse Bertrand, Kim Roberts The Guarantee Company of North America its true and lawful attomey(s)-in-fact to execute, seal and deliver for and on its behalf as surety, any and all bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof, which are or may be allowed, required or permitted by law, statute, rule, regulation, contract or otherwise. The execution of such instrument(s) in pursuance of these presents, shall be as binding upon THE GUARANTEE COMPANY OF NORTH AMERICA USA as fully and amply, to all intents and purposes, as if the same had been duly executed and acknowledged by its regularly elected officers at the principal office. The Power of Attorney is executed and may be certified so, and may be revoked, pursuant to and by authority of Article IX, Section 9.03 of the By -Laws adopted by the Board of Directors of THE GUARANTEE COMPANY OF NORTH AMERICA USA at a meeting held on the 3151 day of December, 2003. The President, or any Vice President, acting with any Secretary or Assistant Secretary, shall have power and authority: 1. To appoint Attorney(s)-in-fact, and to authorize them to execute on behalf of the Company, and attach the Seal of the Company thereto, bonds and undertakings, contracts of indemnity and other writings obligatory in the nature thereof; and 2. To revoke, at any time, any such Attorney-in-fact and revoke the authority given, except as provided below 3. In connection with obligations in favor of the Florida Department of Transportation only, it is agreed that the power and authority hereby given to the Attorney -in -Fact includes any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts required by the State of Florida Department of Transportation. It is fully understood that consenting to the State of Florida Department of Transportation making payment of the final estimate to the Contractor and/or its assignee, shall not relieve this surety company of any of its obligations under its bond. 4. In connection with obligations in favor of the Kentucky Department of Highways only, it is agreed that the power and authority hereby given to the Attorney -in -Fact cannot be modified or revoked unless prior written personal notice of such intent has been given to the Commissioner — Department of Highways of the Commonwealth of Kentucky at least thirty (30) days prior to the modification or revocation. Further, this Power of Attorney is signed and sealed by facsimile pursuant to resolution of the Board of Directors of the Company adopted at a meeting duly called and held on the 6th day of December 2011, of which the following is a true excerpt: RESOLVED that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any Power of Attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, contracts of indemnity and other writings obligatory in the nature thereof, and such signature and seal when so used shall have the same force and effect as though manually affixed. IN WITNESS WHEREOF, THE GUARANTEE COMPANY OF NORTH AMERICA USA has caused this instrument to be signed and its corporate seal to be affixed by its authorized officer, this 2'd day of October, 2015. STATE OF MICHIGAN County of Oakland THE GUARANTEE COMPANY OF NORTH AMERICA USA Stephen C. Ruschak, President & Chief Operating Officer Randall Musselman, Secretary On this 2nd day of October, 2015 before me came the individuals who executed the preceding instrument, to me personally known, and being by me duly swom, said that each is the herein described and authorized officer of The Guarantee Company of North America USA; that the seal affixed to said instrument is the Corporate Seal of said Company; that the Corporate Seal and each signature were duly affixed by order of the Board of Directors of said Cynthia A. Takai Notary Public, State of Michigan County of Oakland My Commission Expires February 27, 2018 Acting in Oakland County IN WITNESS WHEREOF, I have hereunto set my hand at The Guarantee Company of North America USA offices the day and year above written. ci` • 1-c I, Randall Musselman, Secretary of THE GUARANTEE COMPANY OF NORTH AMERICA USA, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney executed by THE GUARANTEE COMPANY OF NORTH AMERICA USA, which is still in full force and effect. IN WITNESS WHEREOF, I have thereunto set my hand and attached the seal of said Company this 3rd day of January, 2017 Randall Musselman, Secretary