C2017-227 - 8/8/2017 - Approved
2017-227 8/08/17 Ord. 031204 JE Construction Services 00 52 23 AGREEMENT This Agreement,for the Project awarded on August 8,2017 is between the City of Corpus Christi (Owner)and JE Construction Services (Contractor). Owner and Contractor agree as follows: ARTICLE 1—WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as: Ralston Avenue Improvements-Staples to Alameda Project No. E16271 ARTICLE 2—DESIGNER AND OWNER'S AUTHORIZED REPRESENTATIVE 2.01 The Project has been designed by: Urban Engineering 2725 Swantner Street Corpus Christi,TX 78404 2.02 The Owner's Authorized Representative for this Project is: Ernesto De La Garza, PE—Construction Management Engineer City of Corpus Christi—Engineering Services 4917 Holly Road,85 Corpus Christi,TX 78411 ARTICLE 3—CONTRACT TIMES 3.01 Contract Times A. The Work is required to be substantially completed within 150 days after the date when the Contract Times commence to run as provided in the Notice to Proceed and is to be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 180 days after the date when the Contract Times commence to run. B. Milestones, and the dates for completion of each,are as defined in SECTION 01 35 00 SPECIAL PROCEDURES. 3.02 Liquidated Damages A. Owner and Contractor recognize that time limits for specified Milestones,Substantial Completion,and completion and readiness for Final Payment as stated in the Contract Documents are of the essence of the Contract. Owner and Contractor recognize that the Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.01 and as adjusted in accordance with Paragraph 11.05 of the General Agreement 00 52 23-1 • Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev os-22-2m6 INDEXED CONTRACT DOCUMENTS FOR CONSTRUCTION OF RALSTON AVENUE IMPROVEMENTS STAPLES TO ALAMEDA PROJECT NUMBER E16271 MEOW City of J 3aeiacr uraarree«m,ra«m«aaraaaraaasiaea �� �C��u.16��t�lY F4��Il.1pSaNaar Corpus Christ�l E E EEEAN NGINEIERING 2725 Swantner Carpus Christi, TX 78404 (361) 854-3101 TBPE FIRM Na.: 145 TBPLS FIRM Na.: 10032400 JUNE 2017 Record Drawing Number -- STR 942 UE Jab Na.: 43125.00.00 000100 TABLE OF CONTENTS Division/ Title Section Division 00 Procurement and Contracting Requirements 00 21 13 Invitation to Bid and Instructions to Bidders (Rev O1-13-2016) 00 30 00 Bid Acknowledgment Form (Rev o1-13-2016) 00 30 01 Bid Form (Revo1-13-2016) 00 30 02 Compliance to State Law on Nonresident Bidders 00 30 05 Disclosure of Interest(Rev o1-13-2016) 00 30 06 Non-Collusion Certification 004516 Statement of Experience (Rev 06-22-2016) 00 52 23 Agreement(Rev 06-22-2016) 006113 Performance Bond (Revo1-13-2016) 00 61 16 Payment Bond (Revo1-13-2016) 00 72 00 General Conditions (Rev 3-23-2015) 00 72 01 Insurance Requirements (Rev06-22-2016) 00 72 02 Wage Rate Requirements(Rev06-12-2015) 00 72 03 Minority/ MBE/ DBE Participation Policy(Rev 01-13-2016) 007300 Supplementary Conditions Division 01 General Requirements 01 11 00 Summary of Work(Revo1-13-2016) 01 23 10 Alternates and Allowances 01 29 00 Application for Payment Procedures (Rev03-11-2015) 01 29 01 Measurement and Basis for Payment (Revo1-13-2016) 01 31 00 Project Management and Coordination (Revo1-13-2016) 01 31 13 Project Coordination 01 31 14 Change Management 013300 Document Management 013301 Submittal Register(Rev 7/3/2014) 013302 Shop Drawings 013303 Record Data 013304 Construction Progress Schedule 013305 Video and Photographic Documentation 013500 Special Procedures 014000 Quality Management Table of Contents 000100- 1 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 Division/ Title Section 01 50 00 Temporary Facilities and Controls 015700 Temporary Controls 01 70 00 Execution and Closeout Requirements Part S Standard Specifications 021020 Site Clearing and Stripping 021040 Site Grading 021080 Removing Abandoned Structures 022020 Excavation and Backfill for Utilities 022021 Control of Groundwater 022022 Trench Safety for Excavations 022040 Street Excavation 022100 Select Material 022420 Silt Fence 025205 Pavement Repair, Curb, Gutter, Sidewalk and Driveway Replacement 025223 Crushed Limestone Flexible Base 025404 Asphalts, Oils, and Emulsions 025412 Prime Coat 025424 Hot Mix Asphalt Concrete Pavement (Class A) 025608 Inlets 025610 Concrete Curb and Gutter 025612 Concrete Sidewalk and Driveways 025612 Concrete Curb Ramp 025620 Portland Cement Concrete Pavement 025802 Temporary Traffic Control During Construction 025818 Reference Specification -TxDOT DMS-4200 Pavement Markers (Reflectorized) 025828 Reference Specification—TxDOT DMS-6130 Bituminous Adhesive for Pavement Marker 026202 Hydrostatic Testing of Pressure Systems 026206 Ductile Iron Pipe and Fittings 026210 PVC Pipe—AWWA C900/C905 Pressure Pipe for Municipal Water Mains and Wastewater Force Main 026214 Grouting Abandoned Utility Lines 026402 Waterlines 026404 Water Service Lines 026409 Tapping Sleeves and Tapping Valves Table of Contents 000100-2 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 Division/ Title Section 026411 Gate Vales for Waterlines 026416 Fire Hydrants 027202 Manholes 027402 Reinforced Concrete Pipes Culverts 027604 Disposal of Waste from Wastewater Cleaning Operations 027611 Cleaning and Televised Inspection of Conduits 028040 Sodding 030020 Portland Cement Concrete 032020 Reinforcing Steel 03800 Concrete Structures 055420 Frames, Gates, Rings and Covers Appendix Title 1 Geotechnical Report END OF SECTION Table of Contents 000100-3 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 00 21 13 INVITATION TO BID AND INSTRUCTIONS TO BIDDERS ARTICLE 1—DEFINED TERMS 1.01 Terms used in this Invitation to Bid and Instructions to Bidders have the meanings indicated in the General Conditions and Supplementary Conditions. ARTICLE 2—GENERAL NOTICE 2.01 The City of Corpus Christi,Texas (Owner) is requesting Bids for the construction of the following Project: Ralston Avenue Improvements -Staples to Alameda Project No. E16271 A. Remove and replace 2600 LF of existing residential road, pavement, and curb and gutter section. B. Construct new storm facilities. C. Provide minor improvements to water system within project. D. Construct new sidewalks and driveways. E. The project includes base bids for two pavements alternatives: Base Bid 1—(A) "Concrete" and Base Bid 2—(B) "Asphalt." Bidders have the option of submitting a bid for either Base Bid 1 or Base Bid 2 or may submit bids for both Base Bids 1 and 2. 2.02 The Engineer's Opinion of Probable Construction Cost for the Project is$2,138,000 for Base Bid 1-A'Concrete" and $1,748,000 for Base Bid 2-13 "Asphalt" . The Project is to be substantially complete and ready for operation within 210 days. The Project is to be complete and eligible for Final Payment 30 days after the date for Substantial Completion. 2.03 Advertisement and bidding information for the Project can be found at the following website: www.CivCastUSA.com 2.04 Contract Documents may be downloaded or viewed free of charge at this website. This website will be updated periodically with Addenda, lists of interested parties, reports, or other information relevant to submitting a Bid for the Project. ARTICLE 3— DELIVERY AND OPENING OF BIDS 3.01 Bids must be received no later than Wednesday,June 28, 2017, at 2:00 pm, to be accepted. Bids received after this time will not be accepted. It is the sole responsibility of the Bidder to deliver the Bid, electronic or hard copy, by the specified deadline. 3.02 Complete and submit the Bid Form, the Bid Bond and the Bid Acknowledgement Form along with all required documents identified in the Bid Acknowledgement Form. Invitation to Bid and Instructions to Bidders 002113- 1 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 01-13-2016 3.03 Electronic Bids may be submitted to the CivCast website at www.civcastusa.com. 3.04 If submitting a hard copy bid or bid security by cashier's check or money order, please address envelopes or packages: City of Corpus Christi City Secretary's Office City Hall Building, 1st Floor 1201 Leopard Street Corpus Christi,Texas 78401 Attention: City Secretary Bid—Ralston Avenue Improvements -Staples to Alameda - Project No. E16271 All envelopes and packages (including FEDEX envelopes) must clearly identify, on the OUTSIDE of the package, the project name and number and that bid documents are enclosed. 3.05 Bids will be publicly opened and read aloud at Wednesday,June 28, 2017, at 2:00 pm, at the following location: City Hall Building— City of Corpus Christi Third Floor, Engineering Services Engineering Services Smart Board Conference Room (Park& Recreation Department) 1201 Leopard Street Corpus Christi,Texas 78401 3.06 The Owner will read aloud the names of the Bidders and the apparent Bid amounts shown on the Bid Summary for all Bids received in time to be considered. ARTICLE 4—PRE-BID CONFERENCE 4.01 A non-mandatory pre-bid conference for the Project will be held on Tuesday,June 20, 2017 at 9:30 am, at the following location: City Hall Building—Engineering Services Conference Room 1 or 2 V floor, Engineering Services 1201 Leopard Street, Corpus Christi,Texas 78401 ARTICLE S—COPIES OF CONTRACT DOCUMENTS 5.01 Obtain a complete set of the Contract Documents as indicated in SECTION 00 52 23 AGREEMENT. 5.02 Use complete sets of Contract Documents in preparing Bids; Bidder assumes sole responsibility for errors or misinterpretations resulting from the use of incomplete sets of Contract Documents. Invitation to Bid and Instructions to Bidders 002113-2 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 01-13-2016 5.03 OPT makes copies of Contract Documents available for the sole purpose of obtaining Bids for completion of the Project and does not confer a license or grant permission or authorization for any other use. ARTICLE 6--EXAMINATION OF CONTRACT DOCUMENTS 6.01 Before submitting a Bid: A. Examine and carefully study the Contract Documents, including any Addenda and related supplemental data. B. Become familiar with all federal, state, and local Laws and Regulations that may affect cost, progress, or the completion of Work. C. Carefully study and correlate the information available to the Bidder with the Contract Documents, Addenda, and the related supplemental data. D. Notify the OAR of all conflicts, errors, ambiguities, or discrepancies that the Bidder discovers in the Contract Documents,Addenda, and the related supplemental data. E. Determine that the Contract Documents, Addenda, and the related supplemental data are generally sufficient to indicate and convey understanding of all terms and conditions for completion of Work. 6.02 The submission of a Bid will constitute an incontrovertible representation by the Bidder that the Bidder has complied with every requirement of this Article 5, that without exception the Bid is premised upon completion of Work required by the Contract Documents, Addenda, and the related supplemental data, that the Bidder has given the OAR written notice of all conflicts, errors, ambiguities, and discrepancies that the Bidder has discovered in the Contract Documents, Addenda, and the related supplemental data and the written resolutions provided by the OAR are acceptable to the Bidder, and that the Contract Documents, Addenda, and the related supplemental data are generally sufficient to indicate and convey understanding of all terms and conditions for completion of Work. ARTICLE 7—INTERPRETATIONS AND ALTERNATE BIDS 7.01 Submit all questions about the meaning or intent of the Contract Documents,Addenda, and the related supplemental data using the Owner's Bidding Website at www.civcastusa.com. Responses to questions submitted will be posted on the website by the Owner for the benefit of all Bidders. Responses will be posted for questions submitted by 5:00 p.m. seven (7) days prior to the date of the bid opening. Inquiries made after this period may not be addressed. 7.02 Submit any offer of alternate terms and conditions, or offer of Work not in strict compliance with the Contract Documents to the OAR no later than 14 days prior to the date for opening of Bids. OAR and Designer will issue Addenda as appropriate if any of the proposed changes to the Contract Documents are accepted. A Bid submitted with clarifications or taking exceptions to the Contract Documents, except as modified by Addenda, may be considered non-responsive. 7.03 Addenda may be issued to clarify, correct, or change the Contract Documents, Addenda or the related supplemental data as deemed advisable by the Owner or Designer. Modifications to the Contract Documents prior to the award of contract can only be made by Addenda. Only Invitation to Bid and Instructions to Bidders 002113-3 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 01-13-2016 answers in Addenda authorized by the Owner will be binding. Oral and other interpretations or clarifications will be without legal effect. ARTICLE 8--BID SECURITY 8.01 Bidders must submit an acceptable Bid Security with their Bid as a guarantee that the Bidder will enter into a contract for the Project with the Owner within 10 days of Notice of Award of the Contract. The security must be payable to the City of Corpus Christi,Texas in the amount of 5 percent(5%) of the greatest amount bid. 8.02 Bid Security may be in the form of a Bid Bond or a cashier's check, certified check, money order, or bank draft from a chartered financial institution authorized to operate in the State of Texas. Bidders submitting bids electronically through the CivCast System at www.CivCastUSA.com shall scan and upload a copy of Bid Bond as an attachment to their bid. Cashier's check, certified check, money order or bank draft must be enclosed in a sealed envelope, plainly identified on the outside as containing bid documents, the bidder's name and the job name and number and delivered as required in Article 3 below. 8.03 Bid Bond Requirements: 1. A Bid Bond must guarantee, without qualification or condition,that the Owner will be paid a sum equal to 5 percent (5%) of the greatest amount bid if, within 10 calendar days of Notice of Award of the Contract, the Bidder/Principal: a. fails to enter into a contract for the Project with the Owner; or b. fails to provide the required Performance and Payment Bonds. 2. A Bid Bond may not limit the sum payable to the Owner to be the difference between the Bidder/Principal's bid and the next highest bidder. 3. The Bid Bond must reference the Project by name as identified in Article 1. 4. Bidders may provide their surety's standard bid bond form if revised to meet these Bid Bond Requirements. 8.04 Failure to provide an acceptable Bid Security will constitute a non-responsive Bid which will not be considered. 8.05 Failure to provide the required Performance and Payment Bonds will result in forfeiture of the Bid Security to the City as liquidated damages. 8.06 Owner may annul the Notice of Award and the Bid Security of the Bidder will be forfeited if the apparent Selected Bidder fails to execute and deliver the Agreement or Amendments to the Agreement. The Bid Security of other Bidders whom the Owner believes to have a reasonable chance of receiving the award may be retained by the Owner until the earlier of 7 days after the Effective Date of the Contract or 90 days after the date Bids are opened. 8.07 Bid Securities are to remain in effect until the Contract is executed. The Bid Securities of all but the three lowest responsible Bidders will be returned within 14 days of the opening of Bids. Bid Securities become void and will be released by the Owner when the Contract is awarded or all Bids are rejected. Invitation to Bid and Instructions to Bidders 002113-4 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 01-13-2016 ARTICLE 9--PREPARATION OF BID 9.01 The Bid Form is included with the Contract Documents and has been made available at the Owner's Bidding Website. Complete all blanks on the Bid Form by typing or printing in ink. Indicate Bid prices for each Bid item or alternate shown. 9.02 Execute the Bid Acknowledgement Form as indicated in the document and include evidence of authority to sign. 9.03 Acknowledge receipt of all Addenda by filling in the number and date of each Addendum. Provide a signature as indicated to verify that the Addenda were received. A Bid that does not acknowledge the receipt of all Addenda may be considered non-responsive. 9.04 Provide the name, address, email, and telephone number of the individual to be contacted for any communications regarding the Bid in the Bid Acknowledgement Form. 9.05 Provide evidence of the Bidder's authority and qualification to do business in the State of Texas or covenant to obtain such qualification prior to award of the Contract. ARTICLE 10--CONFIDENTIALITY OF BID INFORMATION 10.01 In accordance with Texas Government Code 552.110, trade secrets and confidential information in Bids are not open for public inspection. Bids will be opened in a manner that avoids disclosure of confidential information to competing Bidders and keeps the Bids from the public during considerations. All Bids are open for public inspection after the Contract is awarded, but trade secrets and confidential information in Bids are not typically open for public inspection. The Owner will protect this information to the extent allowed by Laws and Regulations. Clearly indicate which specific documents are considered to be trade secrets or confidential information by stamping or watermarking all such documents with the word "confidential" prominently on each page or sheet or on the cover of bound documents. Place "confidential" stamps or watermarks so that they do not obscure any of the required information on the document, either in the original or in a way that would obscure any of the required information in a photocopy of the document. Photocopies of"confidential" documents will be made only for the convenience of the selection committee and will be destroyed after the Effective Date of the Contract. Original confidential documents will be returned to the Bidder after the Effective Date of the Contract if the Bidder indicates that the information is to be returned with the Bid, and arrangements for its return are provided by the Bidder. ARTICLE 11_MODIFICATION OR WITHDRAWAL OF BID 11.01 A Bid may be withdrawn by a Bidder, provided an authorized individual of the Bidder submits a written request to withdraw the Bid prior to the time set for opening the Bids. 11.02 A Bidder may withdraw its Bid within 24 hours after Bids are opened if the Bidder files a signed written notice with the Owner and promptly, but no later than 3 days, thereafter demonstrates to the reasonable satisfaction of the Owner that there was a material and substantial mistake in the preparation of its Bid. The Bid Security will be returned if it is clearly demonstrated to the Owner that there was a material and substantial mistake in its Bid. A Bidder that requests to withdraw its Bid under these conditions may be disqualified from responding to a reissued invitation to Bid for the Work to be furnished under these Contract Documents. Invitation to Bid and Instructions to Bidders 002113-5 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 01-13-2016 ARTICLE 12—BIDS REMAIN SUBJECT TO ACCEPTANCE 12.01 All Bids will remain subject to acceptance for 90 days, but the Owner may, at its sole discretion, release any Bid and return the Bid Security prior to the end of this period. ARTICLE 13--STATEMENT OF EXPERIENCE 13.01 The three lowest Bidders must submit the information required in SECTION 0045 16 STATEMENT OF EXPERIENCE within 5 days of the date Bids are due to demonstrate that the Bidder meets the minimum requirements to complete the Work. ARTICLE 14—EVALUATION OF BIDS 14.01 The Owner will consider the amount bid,the Bidder's responsibilities, the Bidder's safety record, the Bidder's indebtedness to Owner, the Bidder's capacity to perform the work and/or whether the Bidder has met the minimum specific project experience requirements. 14.02 Owner may conduct such investigations as it deems necessary to establish the responsibility of the Bidder and any Subcontractors, individuals, or entities proposed to furnish parts of the Work in accordance with the Contract Documents. 14.03 Submission of a Bid indicates the Bidder's acceptance of the evaluation technique and methodology as well as the Bidder's recognition that some subjective judgments must be made by the Owner during the evaluation. Each Bidder agrees to waive any claim it has or may have against the OPT and their respective employees, arising out of or in connection with the administration, evaluation, or recommendation of any Bid. ARTICLE 15—AWARD OF CONTRACT 15.01 The Bidder selected for award of the Contract will be the lowest responsible Bidder that submits a responsive bid. Owner reserves the right to reject any and all Bids, including without limitation, non-conforming, non-responsive or conditional Bids. The Owner reserves the right to adopt the most advantageous interpretation of the Bids submitted in the case of ambiguity or lack of clearness in stating Bid prices and/or waive any or all formalities. 15.02 More than one Bid for the same Work from an individual or entity under the same or different names will not be considered. Reasonable grounds for believing that any Bidder has an interest in more than one Bid for the Work shall be cause for disqualification of that Bidder and the rejection of all Bids in which that Bidder has an interest. ARTICLE 16_MINORITY/ MBE/ DBE PARTICIPATION POLICY 16.01 Selected Contractor is required to comply with the Owner's Minority/ MBE/ DBE Participation Policy as indicated in SECTION 00 72 03 MINORITY/ MBE/ DBE PARTICIPATION POLICY. 16.02 Minority participation goal for this Project has been established to be 45%. 16.03 Minority Business Enterprise participation goal for this Project has been established to be 15%. Invitation to Bid and Instructions to Bidders 002113-6 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 01-13-2016 ARTICLE 17--BONDS AND INSURANCE 17.01 Article 6 of the General Conditions and SECTION 00 72 01 INSURANCE REQUIREMENTS sets forth the Owner's requirements as to Bonds and insurance. When the Selected Bidder delivers the executed Agreement to the Owner, it must be accompanied by the required Bonds and evidence of insurance. 17.02 Provide Performance and Payment Bonds for this Project that fully comply with the provisions of Texas Government Code Chapter 2253. Administration of Bonds will conform to Texas Government Code Chapter 2253 and the provisions of these Contract Documents. ARTICLE 18—SIGNING OF AGREEMENT 18.01 The City Engineer or Director of Capital Programs will submit recommendation for award to the City Council for those project awards requiring City Council action. The Selected Bidder will be required to deliver the required Bonds and insurance certificates and endorsements along with the required number of counterparts (1) of the Agreement and attached documents to the Owner within 14 days.The Contract will be signed by the City Manager or his/her designee after award and the Bidder's submission of required documentation and signed counterparts. The Contract will not be binding upon Owner until it has been executed by both parties. Owner will process the Contract expeditiously. However, Owner will not be liable for any delays prior to the award or execution of Contract. ARTICLE 19--SALES AND USE TAXES 19.01 The Owner generally qualifies as a tax exempt agency as defined by the statutes of the State of Texas and is usually not subject to any City or State sales or use taxes, however certain items such as rented equipment may be taxable even though Owner is a tax-exempt agency. Assume responsibility for including any applicable sales taxes in the Contract Price and assume responsibility for complying with all applicable statutes and rulings of the State of Texas Comptroller. 19.02 It is the Owner's intent to have this Contract qualify as a "separated contract." ARTICLE 20--WAGE RATES 20.01 This Contract is subject to Texas Government Code Chapter 2258 concerning payment of prevailing wage rates. Requirements for paying the prevailing wage rates are discussed in SECTION 00 72 02 WAGE RATE REQUIREMENTS. Bidders must pay not less than the minimum wage shown on this list and comply with all statutes and rulings of the State of Texas Comptroller. ARTICLE 21—BIDDER'S CERTIFICATION OF NO LOBBYING 21.01 In submitting its Bid, Bidder certifies that it has not lobbied the City or its officials, managers, employees, consultants, or contractors in such a manner as to influence or to attempt to influence the bidding process. In the event it reasonably appears that the Bidder influenced or attempted to influence the bidding process,the City may, in its discretion, reject the Bid. Invitation to Bid and Instructions to Bidders 002113-7 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 01-13-2016 ARTICLE 22--CONFLICT OF INTEREST 22.01 Bidder agrees to comply with Chapter 176 of the Texas Local Government Code and file Form CIQ with the City of Corpus Christi City Secretary's Office, if required. For more information on Form CIQ and to determine if you need to file a Form CIQ, please review the information on the City Secretary's website at http://www.cctexas.com/government/city-secretary/conflict- disclosure/index. ARTICLE 23—CERTIFICATE OF INTERESTED PARTIES 23.01 Bidder agrees to comply with Texas Government Code section 2252.908 and complete Form 1295 Certificate of Interested Parties as part of this contract, if required. For more information, please review the information on the Texas Ethics Commission website at https://www.ethics.state.tx.us. ARTICLE 24-REJECTION OF BID 24.01 The following will be cause to reject a Bid: A. Bids which are not signed by an individual empowered to bind the Bidder. B. Bids which do not have an acceptable Bid Security,with Power of Attorney, submitted as required by Article 8. C. More than one Bid for same Work from an individual, firm, partnership or corporation. D. Evidence of collusion among Bidders. E. Sworn testimony or discovery in pending litigation with Owner which discloses misconduct or willful refusal by bidder to comply with subject contract or instructions of Owner. F. Failure to have an authorized agent of the Bidder attend the mandatory Pre-Bid Conference, if applicable. G. Bids received from a Bidder who has been debarred or suspended by Owner. H. Bids received from a Bidder when Bidder or principals are currently debarred or suspended by Federal, State or City governmental agencies. 24.02 The following may be cause to reject a Bid or cause to deem a Bid non-responsive or irregular. The City reserves the right to waive any irregularities and any or all formalities: A. Poor performance in execution of work under a previous City of Corpus Christi contract. B. Failure to achieve reasonable progress on an existing City of Corpus Christi contract. Evidence of Bidder's recurring failure to complete an item of work within a timeframe acceptable to the City or in accordance with a City-accepted schedule is evidence of Bidder's failure to achieve reasonable progress under this subsection. C. Default on previous contracts or failure to execute Contract after award. D. Evidence of failure to pay Subcontractors, Suppliers or employees in accordance with Contract requirements. E. Bids containing omissions, alterations of form, additions, qualifications or conditions not called for by Owner, or incomplete Bids may be rejected. In any case of ambiguity or lack of clarity in the Bid, OWNER reserves right to determine most advantageous Bid or to reject the Bid. Invitation to Bid and Instructions to Bidders 002113-8 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 01-13-2016 F. Failure to acknowledge receipt of Addenda. G. Failure to submit post-Bid information specified in Section 00 45 16 STATEMENT OF EXPERIENCE within the allotted time(s). H. Failure to timely execute Contract after award. I. Previous environmental violations resulting in fines or citations by a governmental entity (i.e. U.S. Environmental Protection Agency,Texas Commission on Environmental Quality, etc.). J. Bidder's Safety Experience. K. Failure of Bidder to demonstrate,through submission of the Statement of Experience, the experience required as specified in Section 00 45 16 STATEMENT OF EXPERIENCE, if that Section is included in the bidding documents. L. Evidence of Bidder's lack of sufficient resources,workforce, equipment or supervision, if required by inclusion of appropriate requirements in Section 00 45 16 STATEMENT OF EXPERIENCE. M. Evidence of poor performance on previous Projects as documented in Owner's project performance evaluations. N. Unbalanced Unit Price Bid: "Unbalanced Bid" means a Bid, which includes a Bid that is based on unit prices which are significantly less than cost for some Bid items and significantly more than cost for others. This may be evidenced by submission of unit price Bid items where the cost are significantly higher/lower than the cost of the same Bid items submitted by other Bidders on the project. O. Evidence of Bidder's lack of capacity to perform the Work. Evidence of Bidder's lack of capacity. Evidence of capacity to perform the Work will include a factual review of(i) all remaining work or incomplete work items under any existing city or non-city contract; (ii) ability to perform the Work with remaining sufficient resources,workforce, equipment and supervision/supervisory staff; (iii) ability in the past to timely complete the same or similar work in a good and workmanlike manner utilizing same or similar remaining resources or under the same or similar conditions. Evidence of incomplete work items under any existing City-awarded IDIQ or other contract for similar work may constitute a lack of capacity to perform the Work. END OF SECTION Invitation to Bid and Instructions to Bidders 002113-9 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 01-13-2016 00 30 00 BID ACKNOWLEDGEMENT FORM ARTICLE 1—BID RECIPIENT 1.01 In accordance with the Drawings, Specifications, and Contract Documents, this Bid Proposal is submitted by (type or print name of company) on:Wednesday,June 28, 2017 at 2:00pm,for Ralston Avenue Improvements-Staples to Alameda—Project No. E16271. 1.02 Submit Bids, Bid Security and all attachments to the Bid (See Section 7.01 below)to the City's electronic bidding website at www.CivCastUSA.com. If submitting hard copy bids or bid security in the form of a cashier's or certified check, please send to: The City of Corpus Christi,Texas City Secretary's Office 1201 Leopard Street Corpus Christi,Texas 78401 Attention: City Secretary Bid - Ralston Avenue Improvements-Staples to Alameda— Project No. E16271. All envelopes and packages (including FEDEX envelopes) must clearly identify, on the OUTSIDE of the package, the project name and number and that bid documents are enclosed. ARTICLE 2—BIDDERS'S ACKNOWLEDGMENTS 2.01 Bidder proposes and agrees, if this Bid is accepted,to enter into an Agreement with Owner on the form included in the Contract Documents, to perform all Work specified or indicated in Contract Documents for the Contract Price indicated in this Bid or as modified by Contract Amendment. Bidder agrees to complete the Work within the Contract Times established in the Agreement or as modified by Contract Amendment and comply with the all other terms and conditions of the Contract Documents. 2.02 Bidder accepts all of the terms and conditions of SECTION 00 2113 INVITATION AND INSTRUCTIONS TO BIDDERS, including those dealing with required Bonds. The Bid will remain subject to acceptance for 90 days after the opening of Bids. 2.03 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of its failure to complete Work in accordance with the schedule set forth in the Agreement. 2.04 Bidder acknowledges receipt of the following Addenda: Addendum No. Addendum Date Signature Acknowledging Receipt Bid Acknowledgement Form 003000- 1 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271. Rev 01-13-2016 ARTICLE 3—BIDDER'S REPRESENTATIONS 3.01 The Bidder has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. 3.02 The Bidder has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. 3.03 The Bidder is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work. 3.04 The Bidder has carefully studied the following Site-related reports and drawings as identified in the Supplementary Conditions: A. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; B. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; C. Underground Facilities referenced in reports and drawings; D. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and E. Technical Data related to each of these reports and drawings. 3.05 The Bidder has considered the: A. Information known to Bidder; B. Information commonly known to contractors doing business in the locality of the Site; C. Information and observations obtained from visits to the Site; and D. The Contract Documents. 3.06 The Bidder has considered the items identified in Paragraphs 3.04 and 3.05 with respect to the effect of such information, observations, and documents on: A. The cost, progress, and performance of the Work; B. The means, methods, techniques, sequences, and procedures of construction to be employed by Bidder; and C. Bidder's safety precautions and programs. 3.07 Based on the information and observations referred to in the preceding paragraphs, Bidder agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. 3.08 The Bidder is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. Bid Acknowledgement Form 003000-2 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271. Rev 01-13-2016 3.09 The Bidder has correlated the information known to the Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. 3.10 The Bidder has given the OAR written notice of all conflicts, errors, ambiguities, or discrepancies that the Bidder has discovered in the Contract Documents, and the written resolution provided by the OAR is acceptable to the Bidder. 3.11 The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 3.12 Bidder's entry into this Contract constitutes an incontrovertible representation by Bidder that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. ARTICLE 4—BASIS OF BID 4.01 Bidder will complete the Work in accordance with the Contract Documents at the unit prices shown in the BID FORM. A. Extended amounts have been computed in accordance with Paragraph 13.03 of the General Conditions. B. Bidder acknowledges that the estimated quantities are not guaranteed, and final payment for all Unit Price items will be based on actual quantities provided, measured as provided in the Contract Documents. C. Unit Price and figures column will be used to compute the actual Bid price. ARTICLE 5—EVALUATION OF BIDDERS 5.01 The contract may be awarded either to the lowest responsible bidder or to the bidder who provides the best value for the Owner. The Owner will consider the amount bid, the Bidder's responsibility, the Bidder's safety record,the Bidder's indebtedness to Owner and whether the Bidder has met the minimum specific project experience requirements to determine the lowest responsible Bidder.The Owner reserves the right to waive any and all irregularities in determining the Bidders' responsibility or value, and whether the Bidder has met the minimum specific project experience requirements, and reserves the right to require the submission of additional information. 5.02 The Owner has the right to accept a Bid, reject any and all Bids, to waive any and all irregularities in the Bids, or to reject non-conforming, non-responsive or conditional Bids. In addition, the Owner reserves the right to reject any Bid where circumstances and developments have, in the opinion of the Owner, changed the responsibility of the Bidder. 5.03 Material misstatements in the documentation submitted to determine the Bidder's responsibility, including information submitted per SECTION 00 45 16 STATEMENT OF EXPERIENCE, may be grounds for rejection of the Bidder's Bid on this Project. Any such misstatement, if discovered after award of the Contract to such Bidder, may be grounds for immediate termination of the Contract. Additionally, the Bidder will be liable to the Owner for Bid Acknowledgement Form 003000-3 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271. Rev 01-13-2016 any additional costs or damages to the Owner resulting from such misstatements, including costs and attorney's fees for collecting such costs and damages. ARTICLE 6—TIME OF COMPLETION 6.01 Bidder will complete the Work required to be substantially completed within 150 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions. Bidder will complete the Work required for final payment in accordance with Paragraph 15.06 of the General Conditions within 180 days after the date when the Contract Times commence to run. 6.02 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within the number of days indicated. ARTICLE 7—ATTACHMENTS TO THIS BID 7.01 In compliance with the Bid Requirements in SECTION 00 2113 INVITATION TO BID AND INSTRUCTIONS TO BIDDERS, the following are made a condition of this Bid: A. Bid Security. B. SECTION 00 30 00 BID ACKNOWLEDGEMENT FORM and documentation of signatory authority. C. SECTION 00 30 01 BID FORM. D. SECTION 00 30 02 COMPLIANCE TO STATE LAW ON NONRESIDENT BIDDERS. E. SECTION 00 30 05 DISCLOSURE OF INTEREST. F. SECTION 00 30 06 NON-COLLUSION CERTIFICATION. ARTICLE 8—DEFINED TERMS 8.01 The terms used in this Bid have the meanings indicated in the General Conditions and the Supplementary Conditions. The significance of terms with initial capital letters is described in the General Conditions. ARTICLE 9—VENUE 9.01 Bidder agrees that venue shall lie exclusively in Nueces County,Texas for any legal action. ARTICLE 10—SIGNATORY REQUIREMENTS FOR BIDDERS 10.01 Bidders must include their correct legal name, state of residency, and federal tax identification number in the Bid Form. 10.02 The Bidder, or the Bidder's authorized representative, shall sign and date the Bid Form to accompany all materials included in the submitted Bid. Bids which are not signed and dated in this manner, or which do not contain the required documentation of signatory authority may be rejected as non-responsive. The individual(s) signing the Bid must have the authority to bind the Bid Acknowledgement Form 003000-4 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271. Rev 01-13-2016 Bidder to a contract, and if required, shall attach documentation of signatory authority to the Bid Form. 10.03 Bidders who are individuals ("natural persons" as defined by the Texas Business Organizations Code §1.002), but who will not be signing the Bid Form personally, shall include in their bid a notarized power of attorney authorizing the individual designated as their authorized representative to submit the Bid and to sign on behalf of the Bidder. 10.04 Bidders that are entities who are not individuals shall identify in their Bid their charter or Certificate of Authority number issued by the Texas Secretary of State and shall submit with their Bid a copy of a resolution or other documentation approved by the Bidder's governing body authorizing the submission of the Bid and designating the individual(s) authorized to execute documents on behalf of the Bidder. Bidders using an assumed name (an "alias") shall submit a copy of the Certificate of Assumed Name or similar document. 10.05 Bidders that are not residents of the State of Texas must document their legal authority to conduct business in Texas. Nonresident Bidders that have previously registered with the Texas Secretary of State may submit a copy of their Certificate of Authority. Nonresident Bidders that have not previously registered with the Texas Secretary of State shall submit a copy of the Bidder's enabling documents as filed with the state of residency, or as otherwise existing. Bid Acknowledgement Form 003000-5 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271. Rev 01-13-2016 ARTICLE 11—BID SUBMITTAL 11.01 This Bid is submitted by: Bidder: (typed or printed full legal name of Bidder) By: (individual's signature) Name: (typed or printed) Title: (typed or printed) Attest: (individual's signature) State of Residency: Federal Tax Id. No. Address for giving notices: Phone: Email: (Attach evidence of authority to sign if the authorized individual is not the Bidder, but an individual signing on behalf of another individual Bidder, or if the authorized individual is a representative of a corporation, partnership, or joint venture.) END OF SECTION Bid Acknowledgement Form 003000-6 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271. Rev 01-13-2016 00 30 01 BID FORM Project Name: Ralston Avenue Improvements -Staples to Alameda Project Number: E16271 Owner: City of Corpus Christi Bidder: OAR: Designer: Urban Engineering Basis of Bid Item DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDED QUANTITY AMOUNT Base Bid - (A) CONCRETE Part A-A-General(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-A1 Mobilization LS 1 A-A2 Bonds & Insurance LS 1 A-A3 Ozone Action Days DAY 3 A-A4 Traffic Control Plan Mobilization/Adjustments LS 1 A-A5 Traffic Conro) BMPs (Barrels, Cones, Etc) MO 7 A-A6 Utility Coordination LS 1 A-A7 Clear R.O.W. AC 3.25 A-A8 SWPPP LS 1 A-A9 Silt Fence LF 500 A-A10 Inlet Protection EA 14 A-A11 Sod SY 2900 SUBTOTAL PART A-A-GENERAL(Items A-A1 thru A-A11) Part A-B-STREET IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-BI 6"Jointed Reinforced Concrete Pavement SY 8160 A-132 Lime Stabilized Subgrade (7.5% by Weight) SY 9170 A-133 12" Compacted Subgrade SY 9170 A-134 HMAC Pavement Transitions SY 90 A-135 Salvage and Remove Existing Pavement SY 7289 A-136 Concrete Driveway SF 14870 A-137 Roadway Excavation SY 7289 A-138 Curb and Gutter Removal LF 5210 A-139 Sidewalk Removal SF 18550 A-1310 Driveway Removal SF 14870 A-B11 Street Sign Assembly 9" Blades and Stop Sign EA 6 A-1312 Other Regulatory Signs EA 1 A-1313 lAllowance for Unanticipated Street Improvements LS 1 $ 20,000.00 SUBTOTAL PART A-B-STREET IMPROVEMENTS(Items A-B1 thru A-1313) Bid Form Page 1 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 Rev 01-13-2016 00 30 01 BID FORM 7AMOUN X Item DESCRIPTION UNIT ESTIMATED UNIT PRICETENDED QUANTITY I Part A-C-ADA IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-C1 Concrete Sidewalk SF 23185 A-C2 RAP Under Sidewalk/Driveway SY 6950 A-C3 Sidewalk Retaining Curb LF 100 A-C4 Accessible Ramps SF 1475 A-05 JAIlowance for Unanticipated ADA Improvements LS 1 $ 5,000:00 SUBTOTAL PART A-C-RTA IMPROVEMENTS(Items A-C1 thru A-05) Part A-D-DRAINAGE IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-DI 6" Standard Curb LF 5210 A-D2 5' Curb Inlet EA 13 A-D3 Remove Existing Inlet EA 8 A-D4 Remove Existing Pipe (Up to 24") LF 132 A-D5 Manhole Ring and Cover Adjustment EA 3 A-D6 Storm Manhole (Type 'A') EA 4 A-D7 Tie to Existing Manhole EA 2 A-D8 18" RCP LF 579 A-D9 24" RCP LF 357 A-D10 Trench Safety for Storm Water Pipe LF 936 A-D11 Safety Plan for Manholes and Inlets EA 17 A-D12 Allowance for Unanticipated Drainage Improvements LS 1 $ 10,000.00 SUBTOTAL PART A-D-DRAINAGE IMPROVEMENTS(A-D1 THRU A-D12) Part A-E-WATER IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-E1 Fire Hydrant, Pipe and Fittings (Type 1) EA 3 A-E2 Extend Fire Hydrant Lead, Replace FH EA 2 A-E3 6" D.I. Water Main LF 90 A-E4 6" D.I. 45° Bend EA 16 A-E5 Valve Box Adjustment EA 10 A-E6 Service Connection Replacement EA 35 A-E7 Trench Safety for Water Main LF 100 A-E8 Allowance for Unanticipated Water Improvements LS 1 $ 5,000.00 SUBTOTAL PART A-E-WATER IMPROVEMENTS(A-E1 THRU A-E8) Bid Form Page 2 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 Rev 01-13-2016 00 30 01 BID FORM Item DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDED QUANTITYAMOUNT BID SUMMARY SUBTOTAL PART A-A-GENERAL(Items A-A1 thru A-A11) SUBTOTAL PART A-B -STREET IMPROVEMENTS(Items A-131 thru A-1313) SUBTOTAL PART A-C-ADA IMPROVEMENTS(Items A-C1 thru A-05) SUBTOTAL PART A-D - DRAINAGE IMPROVEMENTS (Items A-DI thru A-D12) SUBTOTAL PART A-E -WATER IMPROVEMENTS(Items A-E1 thru A-E8) TOTAL PROJECT BASE BID(A) CONCRETE-(PARTS A-A THRU A-E) Contract Times Bidder agrees to reach Substantial Completion in 1 150 Idays Bidder agrees to reach Final Completion in 1 180 Idays Bid Form Page 3 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 Rev 01-13-2016 00 30 01 BID FORM Project Name: Ralston Avenue Improvements -Staples to Alameda Project Number: E16271 Owner: City of Corpus Christi Bidder: OAR: Designer: Urban Engineering Basis of Bid Item DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDED QUANTITY AMOUNT Base Bid - (B) ASPHALT Part B-A-General(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-A1 Mobilization LS 1 B-A2 Bonds & Insurance LS 1 B-A3 Ozone Action Days DAY 3 B-A4 Traffic Control Plan Mobilization/Adjustments LS 1 B-A5 Traffic Control BMPs (Barrels, Cones, Etc) MO 7 B-A6 Utility Coordination LS 1 B-A7 Clear R.O.W. AC 3.25 B-A8 SWPPP LS 1 B-A9 Silt Fence LF 500 B-A10 Inlet Protection EA 14 B-A11 Sod SY 2900 SUBTOTAL PART B-1-GENERAL(Items B-B1 thru B-1311) Part B-B-STREET IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-BI 2" HMAC (Type 'D') SY 7289 B-B2 Prime Coat (0.15 Gal/SY) GAL 1100 B-B3 Limestone Base (Type A, Grade 1-2)(6" Min) SY 9170 B-B4 Geogrid (TX-5) SY 9170 B-B5 12" Compacted Subgrade SY 9170 B-B6 HMAC Pavement Transitions SY 90 B-B7 Salvage and Remove Existing Pavement SY 7289 B-B8 Concrete Driveway SF 14870 B-B9 Roadway Excavation SY 7289 B-1310 Curb and Gutter Removal LF 5210 B-1311 Sidewalk Removal SF 18550 B-B12 Driveway Removal SF 14870 B-B13 Street Sign Assembly 9" Blades and Stop Sign EA 6 B-B14 Other Regulatory Signs EA 1 B-B15 Allowance for Unanticipated Street Improvements LS 1 $ .;20,000.00 SUBTOTAL PART B-B-STREET IMPROVEMENTS(Items B-B1 thru B-1315) Bid Form Page 1 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 Rev 01-13-2016 00 30 01 BID FORM ItemDESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDED QUANTITY AMOUNT Part B-C-ADA IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-C1 Concrete Sidewalk SF 23185 B-C2 RAP Under Sidewalk SY 6950 B-C3 Sidewalk Retaining Curb LF 100 B-C4 Accessible Ramps SF 1475 B-05 JAIlowance for Unanticipated ADA Improvements LS 1 $ 5,000.00 SUBTOTAL PART B-C-ADA IMPROVEMENTS(B-C1 THRU B-05) Part B-D-DRAINAGE IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-D1 6" Standard Curb and gutter LF 5210 B-D2 5' Curb Inlet EA 13 B-D3 Remove Existing Inlet EA 8 B-D4 Remove Existing Pipe (Up to 24") LF 132 B-D5 Manhole Ring and Cover Adjustment EA 3 B-D6 Storm Manhole (Type 'A') EA 4 B-D7 Tie to Existing Manhole EA 2 B-D8 18" RCP LF 579 B-D9 24" RCP LF 357 B-D10 Trench Safety for Stom Water Pipe LF 936 B-D11 Safety Plan for Manholes and Inlets EA 17 B-D12 Allowance for Unanticipated Drainage Improvements LS 1 $ 10,000.00 SUBTOTAL PART B-D-DRAINAGE IMPROVEMENTS(B-D1 THRU B-D12) Part B-E-WATER IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-E1 Fire Hydrant, Pipe and Fittings (Type 2) EA 3 B-E2 Extend Fire Hydrant Lead, Replace FH EA 2 B-E3 6" D.I. Water Main LF 90 B-E4 6" D.I. 45° Bend EA 16 B-E5 Valve Box Adjustment EA 10 B-E6 Service Connection Replacement EA 35 B-E7 Trench Safety for Water Main LF 100 B-E8 Allowance for Unanticipated Water Improvements LS 1 $ 5,000.00 SUBTOTAL PART B-E-WATER IMPROVEMENTS(B-E1 THRU B-E8) Bid Form Page 2 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 Rev 01-13-2016 00 30 01 BID FORM Item DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDED QUANTITY AMOUNT BID SUMMARY SUBTOTAL PART B-A-GENERAL(Items B-A1 thru B-A11) SUBTOTAL PART B-B-STREET IMPROVEMENTS (Items B-131 thru B-1317) SUBTOTAL PART B-C-ADA IMPROVEMENTS (Items B-C1 thru B-05) SUBTOTAL PART B-D - DRAINAGE IMPROVEMENTS(Items B-D1 thru B-D12) SUBTOTAL PART B-E -WATER IMPROVEMENTS (Items B-E1 thru B-E8) TOTAL PROJECT BASE BID(B)ASPHALT(PARTS B-A THRU B-E) Contract Times Bidder agrees to reach Substantial Completion in 1 150 Idays Bidder agrees to reach Final Completion in 1 180 Idays Bid Form Page 3 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 Rev 01-13-2016 00 30 02 COMPLIANCE TO STATE LAW ON NONRESIDENT BIDDERS Chapter 2252 of the Texas Government Code applies to the award of government contract to nonresident bidders. This law provides that: "a government entity may not award a governmental contract to a nonresident bidder unless the nonresident underbids the lower bid submitted by a responsible resident bidder by an amount that is not less than the amount by which a resident bidder would be required to underbid the nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located." "Nonresident bidder" refers to a person who is not a resident of Texas. "Resident bidder" refers to a person whose principal place of business is in this state, including a contractor whose ultimate parent company or majority owner has its principal place of business in this state. Check the statement that is correct for Bidder. ❑ Bidder qualifies as a nonresident bidder whose principal place of business or residency is in the State of ❑ Bidder (includes parent company or majority owner) qualifies as a resident bidder whose principal place of business is in the State of Texas. The Owner will use the information provided in the State of Texas Comptroller's annual publication of other states' laws on contracts to evaluate the Bids of nonresident Bidders. Bidder: Company Name: (typed or printed) By: (signature--attach evidence of authority to sign) Name: (typed or printed) Title: Business address: Phone: Email: END OF SECTION Compliance to State Law on Nonresident Bidders 003002- 1 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 11-25-2013 00 30 05 City of Corpus Christi Disclosure of Interest SUPPLIER NUMBER TO BE ASSIGNED BY CITY PURCHASING DIVISION City cel' CITY OF CORPUS CHRISTI Corpus DISCLOSURE OF INTEREST Christi City of Corpus Christi Ordinance 17112, as amended, requires all persons or firms seeking to do business with the Cit to to provide the following information. Every question must be answered. If the question is not applicable, answer with "NA". See reverse side for Filing Requirements, Certifications and definitions. COMPANY NAME: P.O.BOX: STREET ADDRESS: CITY: ZIP: - FIRM IS: I. Corporation ❑ 2. Partnership ❑ 3. Sole Owner E]4. Association 5. Other DISCLOSURE QUESTIONS If additional space is necessary please use the reverse side of this page or attach separate sheet. 1. State the names of each `employee" of the City of Corpus Christi having an "ownership interest" constituting 3%or more of the ownership in the above named"firm." Name Job Title and City Department(if known) 2. State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 3% or more of the ownership in the above named"firm." Name Title 3. State the names of each"board member" of the City of Corpus Christi having an"ownership interest" constituting 3%or more of the ownership in the above named"firm." Name Board, Commission or Committee 4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an "ownership interest" constituting 3%or more of the ownership in the above named"firm." Name Consultant City of Corpus Christi 00 30 05- 1 Disclosure of Interest Rev 01-13-2016 FILING REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof,you shall disclose that fact in a signed writing to the City official, employee or body that has been requested to act in the matter, unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2-349 (d)] CERTIFICATION I certify that all information provided is true and correct as of the date of this statement, that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi, Texas as changes occur. Certifying Person: Title: (Type or Print) Signature of Certifying Date: Person: DEFINITIONS a. "Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi, Texas. b. "Economic benefit". An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. c. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part- time basis,but not as an independent contractor. d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and whether established to produce or deal with a product or service, including but not limited to, entities operated in the form of sole proprietorship, as self-employed person, partnership, corporation, joint stock company, joint venture, receivership or trust, and entities which for purposes of taxation are treated as non-profit organizations. e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of Corpus Christi, Texas. f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies, or special terms of venture or partnership agreements." g. "Consultant."Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation. City of Corpus Christi 003005-2 Disclosure of Interest Rev 01-13-2016 00 30 06 NON-COLLUSION CERTIFICATION STATE OF TEXAS COUNTY OF NUECES OWNER: City of Corpus Christi,Texas 1201 Leopard Street Corpus Christi,Texas 78401 CONTRACT: Ralston Avenue Improvements -Staples to Alameda Project No. E16271 Bidder certifies that the it has not been a party to any collusion among Bidders in the restraint of freedom of competition by agreement to submit a Bid at a fixed price or to refrain from bidding; or with any official or employee of the Owner as to quantity, quality, or price in the prospective contract, or any other terms of said prospective contract; or in any discussion between Bidders and any official of the Owner concerning exchange of money or other thing of value for special consideration in the letting of a contract. Company Name: (typed or printed) By: (signature--attach evidence of authority to sign) Name: (typed or printed) Title: Business address: Phone: Email: END OF SECTION Non-Collusion Certification 003006- 1 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 11-25-2013 00 45 16 STATEMENT OF EXPERIENCE ARTICLE 1—REQUIREMENT TO PROVIDE A STATEMENT OF EXPERIENCE 1.01 To be considered a responsive Bidder, the three lowest Bidders must complete and submit the Statement of Experience within 5 days after the date Bids are due to demonstrate the Bidders' responsibility and ability to meet the minimum requirements to complete the Work. Failure to submit the required information in the Statement of Experience may result in the Owner considering the Bid non-responsive and result in rejection of the Bid by the Owner. The Bid Security of the Bidder will be forfeited if Bidder fails to deliver the Statement of Experience in an attempt to be released from its Bid. Bidders may be required to provide supplemental information if requested by the Owner to clarify, enhance or supplement the information provided in the Statement of Experience. 1.02 Bidders must provide the information requested in this Statement of Experience using the forms attached to this Section. A copy of these forms can be provided in Microsoft Word to assist with the preparation of the Statement of Experience. Information in these forms must be provided completely and in detail. Information that cannot be totally incorporated in the form may be included in an attachment to the form. This attachment must be clearly referenced by attachment number in the form, and the attached material must include the attachment number on every sheet of the attachment. The attachment must include only the information that responds to the question or item number to which the attachment information applies. 1.03 The Bidder may also be required to supply a financial statement, prepared no later than 90 days prior to the City Engineer's request, signed and dated by the Bidder's owner, president or other authorized party, specifying all current assets and liabilities. ARTICLE 2—EXPERIENCE REQUIREMENTS 2.01 The Bidder agrees that, in addition to determining the apparent low Bid, the Owner will consider the responsiveness of the Bids and the responsibility of the Bidders in awarding a Contract for this Project. Information that indicates the Bidder or a Subcontractor is not responsible or that might negatively impact a Bidder's ability to complete the Work within the Contract Time and for the Contract Price may result in the Owner rejecting the Bid. 2.02 If none of the three apparent low Bidders are deemed responsible, the Owner may notify the next apparent low Bidders in order, who will then be required to submit the Statement of Experience for review, until a Contract is awarded or all Bids have been rejected. 2.03 The Bidder is responsible for the accuracy and completeness of all of the information provided by the Bidder or a proposed Subcontractor in response to this Statement of Experience. 2.04 Provide general information about the organization as required in Table 1. Describe the organizational structure of the Bidder's organization as it relates to this Project in Table 2. 2.05 Provide resumes for the key personnel that will be actively working on this Project. A. Key personnel include the Project Manager, Project Superintendent, Safety Manager and Quality Control Manager. If key personnel are to fulfill more than one of the roles listed above, provide a written narrative describing how much time will be devoted to each function, their qualifications to fulfill each role, and the percentage of their time that will be devoted to each role. If the individual is not to be devoted solely to this Project, indicate how that individual's time is to be divided between this Project and other assignments. B. The Bidder may provide resumes for an alternate individual if the Bidder is not able to commit to one individual for the Project at the time the Bid is submitted. Qualifications of these individuals will be considered in determining whether the experience of the Bidder meets the minimum requirements. The Bidder must provide the services of the proposed key personnel for the life of the Project as a condition of Statement of Experience 004516-1 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 qualification. Failure to provide the proposed Key Personnel may result in the disqualification of the Bidder and may void the award of the Contract. C. Provide information for each primary and alternate candidate that includes: technical experience, managerial experience,education and formal training and a work history which describes project experience, including the roles and responsibilities for each assignment. Additional information demonstrating experience that meets the minimum requirements should also be included. D. The Project Manager and Project Superintendent must have at least 5 years of recent experience in the management and oversight of projects of a similar size and complexity to this Project. This experience must include scheduling of manpower and materials, safety, coordination of Subcontractors, experience with the submittal process, Federal and State wage rate requirements and contract close-out procedures. The Project Superintendent is to be present at the Site at all times that Work is being performed. Foremen must have at least 5 years of recent experience in similar work and be subordinate to the Project Superintendent. Foremen cannot act as a superintendent without prior written approval from the Owner. 2.06 Provide information on the project experience and past performance of the organization. A. Provide information on projects that have been awarded to the Organization in the last 5 years in Table 3. Attach additional pages if necessary. Experience must include the satisfactory completion of at least five similar projects within the last 5 years for the Bidder's organization that are equal to or greater in size and magnitude than the current Project. B. In determining the responsibility of the Bidder, the Owner will consider the Bidder's past projects and any substandard quality of workmanship on completed projects. The Owner will consider whether the Bidder's past project experience shows substandard quality of workmanship, issues related to a substandard appearance of the completed work,the amount of warranty or rework required, problems with durability and maintainability of the completed project, and problems with the lack of quality of documentation provided. In addition to the work produced, the Owner may consider issues related to the quality of construction practices, responsiveness to the owner's needs during construction, an inability to work in the spirit of partnering and any non-responsiveness of the Bidder to make warranty corrections. Information to make this determination will come from Owner's interviews with references provided for this project. By listing reference contact information in this Statement of Experience, Bidder indicates its approval for OPT to contact the individuals listed as a reference. ARTICLE 3—SAFETY EXPERIENCE REQUIREMENTS 3.01 The Bidder agrees that pursuant to Section 252.0435 of the Local Government Code, the Owner will consider the safety record of the Bidder prior to awarding contracts. The Owner has adopted the following written definitions and criteria for determining the Bidder's safety record. 3.02 The Bidder's safety record will be used to determine if the Bidder can be deemed responsible. 3.03 Provide general information about the safety record of the organization as required in Table 4. A. For purposes of providing this information, the following terms shall have the following meanings: 1. "Bidder" includes the firm, corporation, partnership, or other legal entity represented by the Bidder or anyone acting for such firm, corporation, partnership, or other legal entity submitting the bid. 2. "Citations" include notices of violation, notices of enforcement, suspension/revocation of state or federal licenses or registrations, fines assessed pending criminal complaints, indictments, convictions, administrative orders, draft orders, final orders, and judicial final judgments. Notice of Violations and Notice of Enforcement received from the TCEQ shall include those classified as major violations and moderate violations under the TCEQ's regulations for documentation of Compliance History, 30 Texas Administrative Code, Chapter 60.2 (c) (1) and (2). Statement of Experience 004516-2 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 3. "Environmental Protection Agency" includes, but is not limited to the Texas Commission on Environmental Quality(the "TCEQ"), the United States Environmental Protection Agency (the "EPA"), the U.S. Fish and Wildlife Service, the U.S. Army Corps of Engineers,the Texas Department of State Health Services,the Texas Parks and Wildlife Department, the Structural Pest Control Service, agencies of local governments responsible for enforcing environmental protection laws or regulations, and similar regulatory agencies of other states of the United States. B. In determining the responsibility of the Bidder, the Owner will consider the following in regards to Table 4: 1. Whether the Bidder's response in reveals more than two (2) cases in which final orders have been entered by the Occupational Safety and Health Review Commission (the "OSHRC") against the Bidder for serious violations of Occupational Safety and Health Administration ("OSHA") regulations within the past five (5)years. 2. Whether the Bidder's response reveals more than one (1) case in which Bidder has received a citation or for which final orders have been entered from an environmental protection agency for violations within the past five (5)years. 3. Whether the Bidder's response reveals that the Bidder has been convicted of a criminal offense or has been subject to a judgment for a negligent act or omission, which resulted in serious bodily injury or death, within the past ten (10)years. C. The Owner may consider the responses to each question in Table 4 separately when determining the responsibility of the Bidder.The Owner may also consider the cumulative impact of the information generated by the Bidder's responses. ARTICLE 4—PROVIDE INFORMATION TO DEMONSTRATE THE ABILITY OF THE BIDDER TO PROVIDE SUBCONTRACTING OPPORTUNITIES THAT WILL MEET THE OWNER'S ESTABLISHED GOALS FOR MINORITY, MBE,AND DBE PARTICIPATION IN THE PROJECT. LIST ALL WORK TO BE PERFORMED BY QUALIFIED MINORITY, MBE AND DBE-PROPOSED SUBCONTRACTORS OR SUPPLIERS IN TABLE S. INCLUDE PERCENTAGES OF WORK SUBCONTRACTED TO EACH TO DEMONSTRATE COMPLIANCE WITH OWNER'S STATED GOALS.STATEMENT OF EXPERIENCE REQUIREMENTS 4.01 Provide one printed copy of the Statement of Experience using the referenced tables and narrative descriptions as described in Article 2. Pages are to be 8-1/2 x 11 pages using a minimum font size of 10. A limited number of 11 x 17 sheets may be used, and must be folded to the size of an 8-1/2 x 11 page. 4.02 Provide a digital copy of the Statement of Experience in Portable Document Format(PDF) on a CD, portable drive, or other digital recording device. This digital copy is to include all information required to evaluate the Bid and should match the content of the printed copy of the Bid. When creating the digital copy: A. Create PDF documents from native format files. B. Rotate pages so that the top of the document appears at the top of the file when opened in PDF viewing software. C. Submit PDF documents with adequate resolution to allow documents to be printed in a format equivalent to the original documents. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. D. Submit color PDF documents if color is used in the printed version of the documents. Statement of Experience 004516-3 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 Table 1—Organization Information Organization doing business as: Business Address of Principal Office Telephone No. I Website Form of Business (check one) ❑ Corporation ❑ Partnership ❑ Individual If a Corporation State of Incorporation Date of Incorporation Chief Executive Officer's Name President's Name Vice President's Name(s) Secretary's Name Treasurer's Name If a Partnership Date of Organization Form of Partnership: ❑ General ❑ Limited If an Individual Name Ownership of Organization List of companies, firms, or organizations that own any part of the organization. Names of Companies, Firms, or Organizations Percent Ownership Organization History List of names that this organization currently, has, or anticipates operating under including the names of related companies presently doing business. Names of Organizations From Date To Date Indicators of Organization Size Average number of current full-time employees Average estimate of revenue for the current year Statement of Experience 004516-4 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 Table 1—Organization Information Organization doing business as: Previous History with City of Corpus Christi List the 5 most recent projects that have been completed with the City of Corpus Christi. Project Name Year 1 2 3 4 5 Construction Site Safety Experience Provide Bidders Experience Modification Ratio (EMR) History for the last 3 years. Provide documentation of the EMR. Year EMR Year EMR Year EMR Previous Bidding and Construction Experience Has Bidder or a predecessor organization been disqualified as a bidder within the last 10 years? List Projects below and provide full details in a separate attachment if yes. Has Bidder or a predecessor organization been released from a bid or proposal in the past 10 years? List Projects below and provide full details in a separate attachment if yes. Has Bidder or a predecessor organization ever defaulted on a project or failed to complete any work awarded to it? List Projects below and provide full details in a separate attachment if yes. Has Bidder or a predecessor organization been involved in claims or litigation involving project owners within the last 10 years? List Projects below and provide full details in a separate attachment if yes. Have liens or claims for outstanding unpaid invoices been filed against the Bidder for services or materials on any projects begun within the preceding 3 years? Specify the name and address of the party holding the lien or making the claim, the amount and basis for the lien or claim, and an explanation of why the lien has not been released or that the claim has not been paid if yes. Statement of Experience 004516-5 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 Table 2—Project Information Organization doing business as: Proposed Project Organization Provide a brief description of the organizational structure proposed for this project indicating the names and functional roles of proposed key personnel and alternates. Provide resumes for Project Manager,Superintendent, Safety Manager and Quality Control Manager. Position Primary Alternate Project Manager Superintendent Safety Manager Quality Control Manager Division of work between Bidder and Proposed Subcontractor and Suppliers Provide a list of Work to be self-performed by the Bidder and the Work contracted to Subcontractors and Suppliers for more than 10 percent of the Work(based on estimated subcontract or purchase order amounts and the Contract Price). Description of Work Name of Entity Performing the Estimated Percentage Work of Contract Price Subcontractor Construction Site Safety Experience Provide Experience Modification Ratio (EMR) History for the last 3 years for Subcontractors that will provide Work valued at 25%or more of the Contract Price. Provide documentation of the EMR. Subcontractor Year EMR Year EMR Year EMR Subcontractor Year EMR Year EMR Year EMR Statement of Experience 004516-6 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 Table 3—Projects Awarded during the Last 5 Years Organization doing business as: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Statement of Experience 004516-7 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 Table 3—Projects Awarded during the Last 5 Years—Not including City of Corpus Christi Projects Organization doing business as: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Statement of Experience 004516-8 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 Table 3—Projects Awarded during the Last 5 Years—Not including City of Corpus Christi Projects Organization doing business as: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Project Information Project Name Description Reference Contact Information Project Owner Name/Title Telephone Email Project Designer Project Budget and Performance Original Final Contract #Contract # Days Contract Price Price Days Late Issues/Claims/ Litigation: Statement of Experience 004516-9 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 Table 4—Safety Record Questionnaire and Statement of Bidder's Safety Experience Organization doing business Bidder's Safety Record and Experience Has the Bidder received any Citations for violations of OSHA within the past five (5)years? List Citations below (date and location of Citation) and provide full details in a separate attachment if yes.The full details must include the type of violation or offense, the final disposition of the violation or offense, if any, and the penalty assessed. Has the Bidder received any Citations for violations of environmental protection laws or regulations within the past five (5)years? List Citations below(date and location of Citation) and provide full details in a separate attachment if yes.The full details must include the type of violation or offense,the final disposition of the violation or offense, if any, and the penalty assessed. Has the Bidder, within the past ten (10)years, been convicted of a criminal offense or been subject to a judgment for a negligent act or omission, which resulted in serious bodily injury or death? List convictions or judgments below and provide full details in a separate attachment if yes. The Owner will consider the following information as additional support to make a determination as to the responsibility of the Bidder.The Bidder must answer the following questions and provide evidence that it meets minimum OSHA construction safety standards and has a lost time injury rate that does not exceed the limits established below: 1 Does the Bidder have a written construction safety program? ❑ Yes ❑ No 2 Does the Bidder conduct regular construction site safety inspections? ❑ Yes ❑ No 3 Does the Bidder have an active construction safety training program? ❑ Yes ❑ No 4 Does the Bidder, or affected subcontractor, have competent persons in the following areas (as applicable to the scope of the current Project): A. Scaffolding ❑ Yes ❑ No ❑ N/A LB. Excavation ❑ Yes ❑ No ❑ N/A C. Cranes & Hoists ❑ Yes ❑ No ❑ N/A D. Electrical ❑ Yes ❑ No ❑ N/A Statement of Experience 004516- 10 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 Table 4—Safety Record Questionnaire and Statement of Bidder's Safety Experience Organization doing business as: E. Fall Protection ❑ Yes ❑ No ❑ N/A F. Confined Spaces ❑ Yes ❑ No ❑ N/A G. Material Handling ❑ Yes ❑ No ❑ N/A H. Demolition ❑ Yes ❑ No ❑ N/A I. Steel Erection ❑ Yes ❑ No ❑ N/A J. Underground Construction ❑ Yes ❑ No ❑ N/A Does the Bidder have a lost time injury rate and a total recordable injury rate of less than or equal to the national average for North American Industrial Classification 5 System ("NAICS") Category 23 for each of the past five (5)years? Provide the ❑ Yes ❑ No Bidder's OSHA 300 and 300A logs for the past five (5)years in a separate attachment. Does the Bidder have an experience modifier rate of 1.0 or less? Provide the 6 Bidder's NCCI workers' compensation experience rating sheets for the past five (5) ❑ Yes ❑ No years in a separate attachment. Has the Bidder had any OSHA inspections within the past six(6) months? Provide 7 documentation showing the nature of the inspection,the findings, and the ❑Yes ❑ No magnitude of the issues in a separate attachment if yes. Statement of Experience 004516- 11 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 Table 5—Demonstrated Minority, MBE, DBE Participation Organization doing business as Project Subcontractors and Suppliers Provide a list of anticipated Minority, MBE, DBE Subcontractors or Suppliers contracts that will be used to demonstrate compliance with the Owner's Minority/ MBE/ DBE Participation Policy Name Work to be Provided Estimated%of Contract Price Statement of Experience 004516- 12 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 ARTICLE 5—CERTIFICATION 5.01 By submitting this Statement of Experience and related information, Bidder certifies that it has read this Statement of Experience and that Bidder's responses are true and correct and contain no material misrepresentations and that the individual signing below is authorized to make this certification on behalf of the Bidder's organization. The individual signing this certification shall attach evidence of individual's authority to bind the organization to an agreement. Bidder: (typed or printed) By: (individual's signature) Name: (typed or printed) Title: (typed or printed) Designated Representative: Name: Title: Address: Telephone No.: Email: END OF SECTION Statement of Experience 004516- 13 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 00 52 23 AGREEMENT This Agreement, for the Project awarded on is between the City of Corpus Christi (Owner) and (Contractor). Owner and Contractor agree as follows: ARTICLE 1—WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as: Ralston Avenue Improvements -Staples to Alameda Project No. E16271 ARTICLE 2—DESIGNER AND OWNER'S AUTHORIZED REPRESENTATIVE 2.01 The Project has been designed by: Urban Engineering 2725 Swantner Street Corpus Christi,TX 78404 2.02 The Owner's Authorized Representative for this Project is: TO BE DETERMINED ARTICLE 3—CONTRACT TIMES 3.01 Contract Times A. The Work is required to be substantially completed within 150 days after the date when the Contract Times commence to run as provided in the Notice to Proceed and is to be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 180 days after the date when the Contract Times commence to run. B. Milestones, and the dates for completion of each, are as defined in SECTION 0135 00 SPECIAL PROCEDURES. 3.02 Liquidated Damages A. Owner and Contractor recognize that time limits for specified Milestones, Substantial Completion, and completion and readiness for Final Payment as stated in the Contract Documents are of the essence of the Contract. Owner and Contractor recognize that the Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.01 and as adjusted in accordance with Paragraph 11.05 of the General Conditions. Owner and Contractor also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if Agreement 005223- 1 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty): 1. Substantial Completion: Contractor shall pay Owner$1000 for each day that expires after the time specified in Paragraph 3.01 for Substantial Completion until the Work is substantially complete. 2. Completion of the Remaining Work: Contractor agrees to pay Owner$400 for each day that expires after the time specified in Paragraph 3.01 for completion and readiness for final payment until the Work is completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions. 3. Liquidated damages for failing to timely attain Substantial Completion and Final Completion are not additive and will not be imposed concurrently. 4. Milestones: Contractor agrees to pay Owner liquidated damages as stipulated in SECTION 0135 00 SPECIAL PROCEDURES for failure to meet Milestone completions. 5. The Owner will determine whether the Work has been completed within the Contract Times. B. Owner is not required to only assess liquidated damages, and Owner may elect to pursue its actual damages resulting from the failure of Contractor to complete the Work in accordance with the requirements of the Contract Documents. ARTICLE 4—CONTRACT PRICE 4.01 Owner will pay Contractor for completion of the Work in accordance with the Contract Documents at the unit prices shown in the attached BID FORM. Unit prices have been computed in accordance with Paragraph 13.03 of the General Conditions. Contractor acknowledges that estimated quantities are not guaranteed, and were solely for the purpose of comparing Bids, and final payment for all unit price items will be based on actual quantities, determined as provided in the Contract Documents. Total Base Bid Price $ ARTICLE 5—PAYMENT PROCEDURES 5.01 Submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by the OAR as provided in the General Conditions. 5.02 Progress Payments; Retainage: A. The Owner will make progress payments on or about the 25th day of each month during performance of the Work. Payment is based on Work completed in accordance with the Schedule of Values established as provided in the General Conditions. B. Progress payments equal to 95 percent of the total earned value to date for completed Work and properly stored materials will be made prior to Substantial Completion. The balance will be held as retainage. Agreement 005223-2 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 C. Payment will be made for the amount determined per Paragraph 5.02.13, less the total of payments previously made and less set-offs determined in accordance with Paragraph 15.01 of the General Conditions. D. At the Owner's option, retainage may be required at a higher percentage rate if progress on the Project is considered to be unsatisfactory. If retainage in excess of the amount described above is held prior to Substantial Completion, the Owner will place the additional amount in an interest bearing account. Interest will be paid in accordance with Paragraph 6.01. E. At the Owner's option, Owner may pay Contractor 100 percent of the Work completed, less amounts withheld in accordance with Paragraph 15.01 of the General Conditions and less 200 percent of OAR's estimate of the value of Work to be completed or corrected to reach Substantial Completion. Owner may, at its sole discretion, elect to hold retainage in the amounts set forth above for progress payments prior to Substantial Completion if Owner has concerns with the ability of the Contractor to complete the remaining Work in accordance with the Contract Documents or within the time frame established by this Agreement. Release or reduction in retainage is contingent upon and consent of surety to the reduction in retainage. 5.03 Owner will pay the remainder of the Contract Price as recommended by OAR in accordance with Paragraph 15.06 of the General Conditions upon Final Completion and acceptance of the Work. ARTICLE 6—INTEREST ON OVERDUE PAYMENTS AND RETAINAGE 6.01 The Owner is not obligated to pay interest on overdue payments except as required by Texas Government Code Chapter 2251. 6.02 The Owner is not obligated to pay interest on moneys not paid except as provided in Texas Government Code Chapter 2252. ARTICLE 7—CONTRACTOR'S REPRESENTATIONS 7.01 The Contractor makes the following representations: A. The Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. The Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. The Contractor is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work. D. The Contractor has carefully studied the following Site-related reports and drawings as identified in the Supplementary Conditions: 1. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; 2. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; Agreement 005223-3 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 3. Underground Facilities referenced in reports and drawings; 4. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and 5. Technical Data related to each of these reports and drawings. E. The Contractor has considered the: 1. Information known to Contractor; 2. Information commonly known to contractors doing business in the locality of the Site; 3. Information and observations obtained from visits to the Site; and 4. The Contract Documents. F. The Contractor has considered the items identified in Paragraphs 7.01.D and 7.01.E with respect to the effect of such information, observations, and documents on: 1. The cost, progress, and performance of the Work; 2. The means, methods,techniques, sequences, and procedures of construction to be employed by Contractor; and 3. Contractor's safety precautions and programs. G. Based on the information and observations referred to in the preceding paragraphs, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. H. The Contractor is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. I. The Contractor has correlated the information known to the Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations,tests, studies, and data with the Contract Documents. J. The Contractor has given the OAR written notice of all conflicts, errors, ambiguities, or discrepancies that the Contractor has discovered in the Contract Documents, and the written resolution provided by the OAR is acceptable to the Contractor. K. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. L. Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. ARTICLE 8—ACCOUNTING RECORDS 8.01 Accounting Record Availability: The Contractor shall keep such full and detailed accounts of materials incorporated and labor and equipment utilized for the Work consistent with the requirements of Paragraph 13.01 of the General Conditions and as may be necessary for proper Agreement 005223-4 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 financial management under this Agreement. Subject to prior written notice, the Owner shall be afforded reasonable access during normal business hours to all of the Contractor's records, books, correspondence, instructions, drawings, receipts, vouchers, memoranda, and similar data relating to the Cost of the Work and the Contractor's fee. The Contractor shall preserve all such documents for a period of 3 years after the final payment by the Owner. ARTICLE 9—CONTRACT DOCUMENTS 9.01 Contents: A. The Contract Documents consist of the following: 1. Specifications, forms, and documents listed in SECTION 00 0100 TABLE OF CONTENTS. 2. Drawings listed in the Sheet Index. 3. Addenda. 4. Exhibits to this Agreement: a. Contractor's Bid Form. b. NONE. 5. Documentation required by the Contract Documents and submitted by Contractor prior to Notice of Award. B. There are no Contract Documents other than those listed above in this Article. C. The Contract Documents may only be amended, modified, or supplemented as provided in Article 11 of the General Conditions. ARTICLE 10—CONTRACT DOCUMENT SIGNATURES One original of the signed Agreement will be required. The sequence of signatures will be completed in the following order: A. CONTRACTOR—Agreement must be signed by a person authorized to bind the firm or company. If Contractor is a Corporation, agreements must be Attested; B. ASSISTANT CITY ATTORNEY for the City; C. DIRECTOR OF ENGINEERING SERVICES; D. CITY SECRETARY for the City. Agreement 005223-5 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 ATTEST CITY OF CORPUS CHRISTI Rebecca Huerta J. H. Edmonds, P.E. City Secretary Director of Engineering Services APPROVED AS TO LEGAL FORM: Janet L. Kellogg Assistant City Attorney ATTEST(IF CORPORATION) CONTRACTOR (Seal Below) By: Note: Attach copy of authorization to sign if Title: person signing for CONTRACTOR is not President, Vice President, Chief Executive Officer, or Chief Financial Officer Address City State Zip Phone Fax EMail END OF SECTION Agreement 005223-6 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 00 61 13 PERFORMANCE BOND BOND NO. Contractor as Principal Surety Name: Name: Mailing address (principal place of business): Mailing address (principal place of business): Physical address(principal place of business): Owner Name: City of Corpus Christi,Texas Mailing address (principal place of business): Engineering Services Surety is a corporation organized and existing 1201 Leopard Street under the laws of the state of: Corpus Christi,Texas 78401 By submitting this Bond,Surety affirms its authority to do business in the State of Texas and Contract its license to execute bonds in the State of Texas. Project name and number: Telephone (main number): Telephone (for notice of claim): Local Agent for Surety Name: Award Date of the Contract: Address: Contract Price: Bond Telephone: E-Mail Address: Date of Bond: (Date of Bond cannot be earlier than Award Date The address of the surety company to which any of the Contract) notice of claim should be sent may be obtained Said Principal and Surety have signed and sealed from the Texas Dept. of Insurance by calling the this instrument in 4 copies, each one of which shall following toll-free number.1-800-252-3439 be deemed an original. Performance Bond 006113- 1 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 01-13-2016 Surety and Contractor, intending to be legally bound and obligated to Owner do each cause this Performance Bond to be duly executed on its behalf by its authorized officer, agent or representative. The Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns,jointly and severally to this bond. The condition of this obligation is such that if the Contractor as Principal faithfully performs the Work required by the Contract then this obligation shall be null and void;otherwise the obligation is to remain in full force and effect. Provisions of the bond shall be pursuant to the terms and provisions of Chapter 2253 and Chapter 2269 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter to the some extent as if it were copied at length herein. Venue shall lie exclusively in Nueces County, Texas for any legal action. Contractor as Principal Surety Signature: Signature: Name: Name: Title: Title: Email Address: Email Address: (Attach Power of Attorney and place surety seal below) END OF SECTION Performance Bond 006113-2 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 01-13-2016 00 61 16 PAYMENT BOND BOND NO. Contractor as Principal Surety Name: Name: Mailing address (principal place of business): Mailing address (principal place of business): Physical address(principal place of business): Owner Name: City of Corpus Christi,Texas Mailing address (principal place of business): Engineering Services Surety is a corporation organized and existing 1201 Leopard Street under the laws of the state of: Corpus Christi,Texas 78401 By submitting this Bond,Surety affirms its authority to do business in the State of Texas and Contract its license to execute bonds in the State of Texas. Project name and number: Telephone (main number): Telephone (for notice of claim): Local Agent for Surety Name: Award Date of the Contract: Address: Contract Price: Bond Telephone: E-Mail Address: Date of Bond: (Date of Bond cannot be earlier than Award Date The address of the surety company to which any of Contract) notice of claim should be sent may be obtained Said Principal and Surety have signed and sealed from the Texas Dept. of Insurance by calling the this instrument in 4 copies, each one of which shall following toll-free number.1-800-252-3439 be deemed an original. Payment Bond Form 006116-1 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev.01-13-2016 Surety and Contractor, intending to be legally bound and obligated to Owner do each cause this Payment Bond to be duly executed on its behalf by its authorized officer, agent or representative. The Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns,jointly and severally to this bond. The condition of this obligation is such that if the Contractor as Principal pays all claimants providing labor or materials to him or to a Subcontractor in the prosecution of the Work required by the Contract then this obligation shall be null and void;otherwise the obligation is to remain in full force and effect. Provisions of the bond shall be pursuant to the terms and provisions of Chapter 2253 and Chapter 2269 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter to the some extent as if it were copied at length herein. Venue shall lie exclusively in Nueces County, Texas for any legal action. Contractor as Principal Surety Signature: Signature: Name: Name: Title: Title: Email Address: Email Address: (Attach Power of Attorney and place surety seal below) END OF SECTION Payment Bond Form 006116-2 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev.01-13-2016 00 72 00 GENERAL CONDITIONS Table of Contents Page Article 1—Definitions and Terminology.......................................................................................................6 1.01 Defined Terms...............................................................................................................................6 1.02 Terminology................................................................................................................................11 Article 2—Preliminary Matters...................................................................................................................12 2.01 Delivery of Bonds and Evidence of Insurance.............................................................................12 2.02 Copies of Documents..................................................................................................................13 2.03 Before Starting Construction ......................................................................................................13 2.04 Preconstruction Conference; Designation of Authorized Representatives................................13 Article 3—Contract Documents: Intent, Requirements, Reuse.................................................................13 3.01 Intent...........................................................................................................................................13 3.02 Reference Standards...................................................................................................................15 3.03 Reporting and Resolving Discrepancies......................................................................................15 3.04 Interpretation of the Contract Documents.................................................................................16 3.05 Reuse of Documents...................................................................................................................16 Article 4—Commencement and Progress of the Work..............................................................................16 4.01 Commencement of Contract Times; Notice to Proceed.............................................................16 4.02 Starting the Work........................................................................................................................16 4.03 Progress Schedule.......................................................................................................................17 4.04 Delays in Contractor's Progress..................................................................................................17 Article 5—Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions...................................................................................................................................................18 5.01 Availability of Lands....................................................................................................................18 5.02 Use of Site and Other Areas........................................................................................................18 5.03 Subsurface and Physical Conditions............................................................................................19 5.04 Differing Subsurface or Physical Conditions...............................................................................19 5.05 Underground Facilities................................................................................................................21 5.06 Hazardous Environmental Conditions at Site.............................................................................22 Article 6—Bonds and Insurance .................................................................................................................24 6.01 Performance, Payment, and Other Bonds..................................................................................24 6.02 Licensed Sureties ........................................................................................................................24 General Conditions 007200- 1 Corpus Christi Standards-Regular Projects 03-23-2015 6.03 Insurance.....................................................................................................................................25 Article 7—Contractor's Responsibilities.....................................................................................................25 7.01 Supervision and Superintendence..............................................................................................25 7.02 Labor; Working Hours.................................................................................................................25 7.03 Services, Materials, and Equipment ...........................................................................................26 7.04 Concerning Subcontractors, Suppliers, and Others....................................................................26 7.05 Patent Fees and Royalties...........................................................................................................27 7.06 Permits........................................................................................................................................28 7.07 Taxes...........................................................................................................................................28 7.08 Laws and Regulations..................................................................................................................28 7.09 Safety and Protection .................................................................................................................29 7.10 Safety Representative.................................................................................................................30 7.11 Hazard Communication Programs..............................................................................................30 7.12 Emergencies................................................................................................................................30 7.13 Contractor's General Warranty and Guarantee.........................................................................30 7.14 Indemnification...........................................................................................................................31 7.15 Delegation of Professional Design Services................................................................................32 Article 8—Other Work at the Site...............................................................................................................33 8.01 Other Work.................................................................................................................................33 8.02 Coordination...............................................................................................................................34 8.03 Legal Relationships......................................................................................................................34 Article 9—Owner's and OPT's Responsibilities...........................................................................................35 9.01 Communications to Contractor ..................................................................................................35 9.02 Replacement of Owner's Project Team Members......................................................................35 9.03 Furnish Data................................................................................................................................35 9.04 Pay When Due.............................................................................................................................35 9.05 Lands and Easements; Reports and Tests...................................................................................35 9.06 Insurance.....................................................................................................................................35 9.07 Modifications..............................................................................................................................35 9.08 Inspections,Tests, and Approvals...............................................................................................35 9.09 Limitations on OPT's Responsibilities .........................................................................................35 9.10 Undisclosed Hazardous Environmental Condition......................................................................36 9.11 Compliance with Safety Program................................................................................................36 General Conditions 007200-2 Corpus Christi Standards-Regular Projects 03-23-2015 Article 10—OAR's and Designer's Status During Construction ..................................................................36 10.01 Owner's Representative..........................................................................................................36 10.02 Visits to Site.............................................................................................................................36 10.03 Resident Project Representatives...........................................................................................36 10.04 Rejecting Defective Work........................................................................................................36 10.05 Shop Drawings, Modifications and Payments.........................................................................36 10.06 Decisions on Requirements of Contract Documents and Acceptability of Work...................37 10.07 Limitations on OAR's and Designer's Authority and Responsibilities.....................................37 Article 11—Amending the Contract Documents; Changes in the Work ....................................................37 11.01 Amending and Supplementing the Contract Documents.......................................................37 11.02 Owner-Authorized Changes in the Work................................................................................38 11.03 Unauthorized Changes in the Work........................................................................................38 11.04 Change of Contract Price........................................................................................................39 11.05 Change of Contract Times.......................................................................................................40 11.06 Change Proposals....................................................................................................................40 11.07 Execution of Change Orders ...................................................................................................40 11.08 Notice to Surety......................................................................................................................41 Article12—Claims.......................................................................................................................................42 12.01 Claims......................................................................................................................................42 12.02 Claims Process.........................................................................................................................42 Article 13—Cost of the Work; Allowances; Unit Price Work......................................................................43 13.01 Cost of the Work.....................................................................................................................43 13.02 Allowances..............................................................................................................................46 13.03 Unit Price Work.......................................................................................................................46 13.04 Contingencies..........................................................................................................................47 Article 14—Tests and Inspections; Correction, Removal, or Acceptance of Defective Work....................47 14.01 Access to Work........................................................................................................................47 14.02 Tests, Inspections, and Approvals...........................................................................................47 14.03 Defective Work.......................................................................................................................48 14.04 Acceptance of Defective Work................................................................................................49 14.05 Uncovering Work....................................................................................................................49 14.06 Owner May Stop the Work.....................................................................................................49 14.07 Owner May Correct Defective Work.......................................................................................50 General Conditions 007200-3 Corpus Christi Standards-Regular Projects 03-23-2015 Article 15—Payments to Contractor; Set-Offs; Completion; Correction Period........................................50 15.01 Progress Payments..................................................................................................................50 15.02 Contractor's Warranty of Title................................................................................................52 15.03 Substantial Completion...........................................................................................................52 15.04 Partial Utilization.....................................................................................................................53 15.05 Final Inspection.......................................................................................................................53 15.06 Final Payment..........................................................................................................................53 15.07 Waiver of Claims.....................................................................................................................54 15.08 Correction Period....................................................................................................................54 Article 16—Suspension of Work and Termination.....................................................................................55 16.01 Owner May Suspend Work.....................................................................................................55 16.02 Owner May Terminate for Cause............................................................................................55 16.03 Owner May Terminate For Convenience................................................................................56 Article 17— Final Resolution of Disputes....................................................................................................57 17.01 Methods and Procedures........................................................................................................57 Article18—Miscellaneous..........................................................................................................................57 18.01 Computation of Times.............................................................................................................57 18.02 Owner's Right to Audit Contractor's Records.........................................................................57 18.03 Independent Contractor.........................................................................................................58 18.04 Cumulative Remedies .............................................................................................................58 18.05 Limitation of Damages............................................................................................................58 18.06 No Waiver...............................................................................................................................58 18.07 Severability..............................................................................................................................58 18.08 Survival of Obligations............................................................................................................59 18.09 No Third Party Beneficiaries ...................................................................................................59 18.10 Assignment of Contract...........................................................................................................59 18.11 No Waiver of Sovereign Immunity..........................................................................................59 18.12 Controlling Law.......................................................................................................................59 18.13 Conditions Precedent to Right to Sue.....................................................................................59 18.14 Waiver of Trial by Jury.............................................................................................................59 18.15 Attorney Fees..........................................................................................................................59 18.16 Compliance with Laws.............................................................................................................59 18.17 Enforcement............................................................................................................................60 General Conditions 007200-4 Corpus Christi Standards-Regular Projects 03-23-2015 18.18 Subject to Appropriation.........................................................................................................60 18.19 Contract Sum...........................................................................................................................60 18.20 Contractor's Guarantee as Additional Remedy......................................................................60 General Conditions 007200-5 Corpus Christi Standards-Regular Projects 03-23-2015 ARTICLE 1—DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. A term with initial capital letters, including the term's singular and plural forms, has the meaning indicated in this paragraph wherever used in the Bidding Requirements or Contract Documents. In addition to the terms specifically defined,terms with initial capital letters in the Contract Documents may include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda - Documents issued prior to the receipt of Bids which clarify or modify the Bidding Requirements or the proposed Contract Documents. 2. Agreement-The document executed between Owner and Contractor covering the Work. 3. Alternative Dispute Resolution -The process by which a disputed Claim may be settled as an alternative to litigation, if Owner and Contractor cannot reach an agreement between themselves. 4. Application for Payment-The forms used by Contractor to request payments from Owner and the supporting documentation required by the Contract Documents. 5. Award Date—The date the City Council of the City of Corpus Christi (City) authorizes the City Manager or designee to execute the Contract on behalf of the City. 6. Bid -The documents submitted by a Bidder to establish the proposed Contract Price and Contract Times and provide other information and certifications as required by the Bidding Requirements. 7. Bidding Documents-The Bidding Requirements, the proposed Contract Documents, and Addenda. 8. Bidder-An individual or entity that submits a Bid to Owner. 9. Bidding Requirements-The Invitation for Bids, Instructions to Bidders, Bid Security, Bid Form and attachments, and required certifications. 10. Bid Security-The financial security in the form of a bid bond provided by Bidder at the time the Bid is submitted and held by Owner until the Agreement is executed and the evidence of insurance and Bonds required by the Contract Documents are provided. A cashier's check, certified check, money order or bank draft from any State or National Bank will also be acceptable. 11. Bonds - Performance Bond, Payment Bond, Maintenance Bond, and other Surety instruments executed by Surety. When in singular form, refers to individual instrument. 12. Change Order-A document issued on or after the Effective Date of the Contract and signed by Owner and Contractor which modifies the Work, Contract Price, Contract Times, or terms and conditions of the Contract. General Conditions 007200-6 Corpus Christi Standards-Regular Projects 03-23-2015 13. Change Proposal -A document submitted by Contractor in accordance with the requirements of the Contract Documents: a. Requesting an adjustment in Contract Price or Contract Times; b. Contesting an initial decision concerning the requirements of the Contract Documents or the acceptability of Work under the Contract Documents; C. Challenging a set-off against payment due; or d. Seeking a Modification with respect to the terms of the Contract. 14. City Engineer-The Corpus Christi City Engineer and/or his designated representative as identified at the preconstruction conference or in the Notice to Proceed. 15. Claim -A demand or assertion by Owner or Contractor submitted in accordance with the requirements of the Contract Documents. A demand for money or services by an entity other than the Owner or Contractor is not a Claim. 16. Constituent of Concern -Asbestos, petroleum, radioactive materials, polychlorinated biphenyls (PCBs), hazardous wastes, and substances, products,wastes, or other materials that are or become listed, regulated, or addressed pursuant to: a. The Comprehensive Environmental Response, Compensation and Liability Act,42 U.S.C. §§9601 et seq. ("CERCLA"); b. The Hazardous Materials Transportation Act, 49 U.S.C. §§5501 et seq.; C. The Resource Conservation and Recovery Act, 42 U.S.C. §§6901 et seq. ("RCRA"); d. The Toxic Substances Control Act, 15 U.S.C. §§2601 et seq.; e. The Clean Water Act, 33 U.S.C. §§1251 et seq.; f. The Clean Air Act,42 U.S.C. §§7401 et seq.; or g. Any other Laws or Regulations regulating, relating to, or imposing liability or standards of conduct concerning hazardous, toxic, or dangerous waste, substance, or material. 17. Contract-The entire integrated set of documents concerning the Work and describing the relationship between the Owner and Contractor. 18. Contract Amendment-A document issued on or after the Effective Date of the Contract and signed by Owner and Contractor which: a. Authorizes new phases of the Work and establishes the Contract Price, Contract Times, or terms and conditions of the Contract for the new phase of Work; or b. Modifies the terms and conditions of the Contract, but does not make changes in the Work. 19. Contract Documents -Those items designated as Contract Documents in the Agreement. 20. Contract Price -The monetary amount stated in the Agreement and as adjusted by Modifications, and increases or decreases in unit price quantities, if any, that Owner has agreed to pay Contractor for completion of the Work in accordance with the Contract Documents. General Conditions 007200-7 Corpus Christi Standards-Regular Projects 03-23-2015 21. Contract Times-The number of days or the dates by which Contractor must: a. Achieve specified Milestones; b. Achieve Substantial Completion; and C. Complete the Work. 22. Contractor-The individual or entity with which Owner has contracted for performance of the Work. 23. Contractor's Team -Contractor and Subcontractors, Suppliers, individuals, or entities directly or indirectly employed or retained by them to perform part of the Work or anyone for whose acts they may be liable. 24. Cost of the Work-The sum of costs incurred for the proper performance of the Work as allowed by Article 13. 25. Defective -When applied to Work, refers to Work that is unsatisfactory,faulty, or deficient in that it: a. Does not conform to the Contract Documents; b. Does not meet the requirements of applicable inspections, reference standards, tests, or approvals referred to in the Contract Documents; or C. Has been damaged or stolen prior to OAR's recommendation of final payment unless responsibility for the protection of the Work has been assumed by Owner at Substantial Completion in accordance with Paragraphs 15.03 or 15.04. 26. Designer-The individuals or entity named as Designer in the Agreement and the subconsultants, individuals, or entities directly or indirectly employed or retained by Designer to provide design or other technical services to the Owner. Designer has responsibility for engineering or architectural design and technical issues related to the Contract Documents. Designers are Licensed Professional Engineers or Registered Architects qualified to practice their profession in the State of Texas. 27. Drawings -The part of the Contract that graphically shows the scope, extent, and character of the Work. Shop Drawings and other Contractor documents are not Drawings. 28. Effective Date of the Contract-The date indicated in the Agreement on which the City Manager or designee has signed the Contract. 29. Field Order-A document issued by OAR or Designer requiring changes in the Work that do not change the Contract Price or the Contract Times. 30. Hazardous Environmental Condition -The presence of Constituents of Concern at the Site in quantities or circumstances that may present a danger to persons or property exposed to Constituents of Concern. The presence of Constituents of Concern at the Site necessary for the execution of the Work or to be incorporated in the Work is not a Hazardous Environmental Condition provided these Constituents of Concern are controlled and contained pursuant to industry practices, Laws and Regulations, and the requirements of the Contract. General Conditions 007200-8 Corpus Christi Standards-Regular Projects 03-23-2015 31. Indemnified Costs-All costs, losses, damages, and legal or other dispute resolution costs resulting from claims or demands against Owner's Indemnitees. These costs include fees for engineers, architects, attorneys, and other professionals. 32. Laws and Regulations; Laws or Regulations -Applicable laws, statutes, rules, regulations, ordinances, codes, and orders of governmental bodies, agencies, authorities, and courts having jurisdiction over the Project. 33. Liens -Charges, security interests, or encumbrances upon Contract related funds, real property, or personal property. 34. Milestone-A principal event in the performance of the Work that Contractor is required by Contract to complete by a specified date or within a specified period of time. 35. Modification -Change made to the Contract Documents by one of the following methods: a. Contract Amendment; b. Change Order; C. Field Order; or d. Work Change Directive. 36. Notice of Award -The notice of Owner's intent to enter into a contract with the Selected Bidder. 37. Notice to Proceed -A notice to Contractor of the Contract Times and the date Work is to begin. 38. Owner-The City of Corpus Christi (City), a Texas home-rule municipal corporation and political subdivision organized under the laws of the State of Texas, acting by and through its duly authorized City Manager and his designee, the City Engineer(the Director of Engineering Services), and the City's officers, employees, agents, or representatives, authorized to administer design and construction of the Project. 39. Owner's Authorized Representative or OAR -The individual or entity named as OAR in the Agreement and the consultants, subconsultants, individuals, or entities directly or indirectly employed or retained by them to provide construction management services to the Owner. The OAR may be an employee of the Owner. 40. Owner's Indemnitees- Each member of the OPT and their officers, directors, members, partners, employees, agents, consultants, and subcontractors. 41. Owner's Project Team or OPT-The Owner, Owner's Authorized Representative, Resident Project Representative, Designer, and the consultants, subconsultants, individuals, or entities directly or indirectly employed or retained by them to provide services to the Owner. 42. Partial Occupancy or Use- Use by Owner of a substantially completed part of the Work for the purpose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work. General Conditions 007200-9 Corpus Christi Standards-Regular Projects 03-23-2015 43. Progress Schedule-A schedule prepared and maintained by Contractor, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Times. 44. Project-The total undertaking to be accomplished for Owner under the Contract Documents. 45. Resident Project Representative or RPR -The authorized representative of OPT assigned to assist OAR at the Site. As used herein, the term Resident Project Representative includes assistants and field staff of the OAR. 46. Samples- Physical examples of materials, equipment, or workmanship representing some portion of the Work that are used to establish the standards for that portion of the Work. 47. Schedule of Documents-A schedule of required documents, prepared, and maintained by Contractor. 48. Schedule of Values -A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for Contractor's Applications for Payment. 49. Selected Bidder-The Bidder to which Owner intends to award the Contract. 50. Shop Drawings-All drawings, diagrams, illustrations, schedules, and other data or information that are specifically prepared or assembled and submitted by Contractor to illustrate some portion of the Work. Shop Drawings, whether approved or not, are not Drawings and are not Contract Documents. 51. Site- Lands or areas indicated in the Contract Documents as being furnished by Owner upon which the Work is to be performed. The Site includes rights-of-way, easements, and other lands furnished by Owner which are designated for use by the Contractor. 52. Specifications-The part of the Contract that describes the requirements for materials, equipment, systems, standards, and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable to the Work. 53. Subcontractor-An individual or entity having a direct contract with Contractor or with other Subcontractors or Suppliers for the performance of a part of the Work. 54. Substantial Completion -The point where the Work or a specified part of the Work is sufficiently complete to be used for its intended purpose in accordance with the Contract Documents. 55. Supplementary Conditions-The part of the Contract that amends or supplements the General Conditions. 56. Supplier-A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with Subcontractors or other Suppliers to furnish materials or equipment to be incorporated in the Work. 57. Technical Data -Those items expressly identified as Technical Data in the Supplementary Conditions with respect to either: a. Subsurface conditions at the Site; General Conditions 007200- 10 Corpus Christi Standards-Regular Projects 03-23-2015 b. Physical conditions relating to existing surface or subsurface structures at the Site, except Underground Facilities; or C. Hazardous Environmental Conditions at the Site. 58. Underground Facilities-All underground pipelines, conduits, ducts, cables,wires, manholes,vaults, tanks, tunnels, other similar facilities or appurtenances, and encasements containing these facilities which are used to convey electricity, gases, steam, liquid petroleum products, telephone or other communications, fiber optic transmissions, cable television, water,wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 59. Unit Price Work-Work to be paid for on the basis of unit prices. 60. Work-The construction of the Project or its component parts as required by the Contract Documents. 61. Work Change Directive -A directive issued to Contractor on or after the Effective Date of the Contract ordering an addition, deletion, or revision in the Work. The Work Change Directive serves as a memorandum of understanding regarding the directive until a Change Order can be issued. 1.02 Terminology A. The words and terms discussed in this Paragraph 1.02 are not defined, but when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. It is understood that the cost for performing Work is included in the Contract Price and no additional compensation is to be paid by Owner unless specifically stated otherwise in the Contract Documents. Expressions including or similar to "at no additional cost to Owner," "at Contractor's expense," or similar words mean that the Contractor is to perform or provide specified operation of Work without an increase in the Contract Price. C. The terms "day" or"calendar day" mean a calendar day of 24 hours measured from midnight to the next midnight. D. The meaning and intent of certain terms or adjectives are described as follows: 1. The terms "as allowed," "as approved," "as ordered," "as directed," or similar terms in the Contract Documents indicate an exercise of professional judgment by the OPT. 2. Adjectives including or similar to "reasonable," "suitable," "acceptable," "proper," "satisfactory," or similar adjectives are used to describe a determination of OPT regarding the Work. 3. Any exercise of professional judgment by the OPT will be made solely to evaluate the Work for general compliance with the Contract Documents unless there is a specific statement in the Contract Documents indicating otherwise. 4. The use of these or similar terms or adjectives does not assign a duty or give OPT authority to supervise or direct the performance of the Work, or assign a duty or give authority to the OPT to undertake responsibilities contrary to the provisions of Articles 9 or 10 or other provisions of the Contract Documents. General Conditions 007200- 11 Corpus Christi Standards-Regular Projects 03-23-2015 E. The use of the words "furnish," "install," "perform," and "provide" have the following meanings when used in connection with services, materials, or equipment: 1. Furnish means to supply and deliver the specified services, materials, or equipment to the Site or other specified location ready for use or installation. 2. Install means to complete construction or assembly of the specified services, materials, or equipment so they are ready for their intended use. 3. Perform or provide means to furnish and install specified services, materials, or equipment, complete and ready for their intended use. 4. Perform or provide the specified services, materials, or equipment complete and ready for intended use if the Contract Documents require specific services, materials, or equipment, but do not expressly use the words "furnish," "install," "perform," or "provide." F. Contract Documents are written in modified brief style: 1. Requirements apply to all Work of the same kind, class, and type even though the word "all" is not stated. 2. Simple imperative sentence structure is used which places a verb as the first word in the sentence. It is understood that the words "furnish," "install," "perform," "provide," or similar words include the meaning of the phrase "The Contractor shall..." before these words. 3. Unless specifically stated that action is to be taken by the OPT or others, it is understood that the action described is a requirement of the Contractor. G. Words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with this recognized meaning unless stated otherwise in the Contract Documents. H. Written documents are required where reference is made to notices, reports, approvals, consents, documents, statements, instructions, opinions or other types of communications required by the Contract Documents. Approval and consent documents must be received by Contractor prior to the action or decision for which approval or consent is given. These may be made in printed or electronic format through the OPT's project management information system or other electronic media as required by the Contract Documents or approved by the OAR. I. Giving notice as required by the Contract Documents may be by printed or electronic media using a method that requires acknowledgment of the receipt of that notice. ARTICLE 2—PRELIMINARY MATTERS 2.01 Delivery of Bonds and Evidence of Insurance A. Provide required Bonds with the executed Agreement. B. Provide evidence of insurance required by the Contract Documents with the executed Agreement. General Conditions 007200- 12 Corpus Christi Standards-Regular Projects 03-23-2015 2.02 Copies of Documents A. OPT is to furnish one fully executed Agreement and one copy of the executed Contract Documents in electronic portable document format (PDF). This document is the Project Record Copy of the Contract Documents. 2.03 Before Starting Construction A. Provide the following preliminary documents in accordance with the Contract Documents within 10 days after the Effective Date of the Contract: 1. Progress Schedule; 2. Schedule of Documents; and 3. Schedule of Values and projected cash flow information. 2.04 Preconstruction Conference; Designation of Authorized Representatives A. Attend the preconstruction conference as required by the Contract Documents. B. Designate the specific individuals authorized to act as representatives of the Contractor. These individuals must have the authority to transmit and receive information, render decisions relative to the Contract, and otherwise act on behalf of the Contractor. C. Owner is to designate the specific individuals authorized to act as representatives of the Owner and the limits of their authority with regard to acting on behalf of the Owner. ARTICLE 3—CONTRACT DOCUMENTS: INTENT, REQUIREMENTS, REUSE 3.01 Intent A. Requirements of components of the Contract Documents are as binding as if required by all Contract Documents. It is the intent of the Contract Documents to describe a functionally complete Project. The Contract Documents do not indicate or describe all of the Work required to complete the Project. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the OPT. 1. The Contract requirements described in the General Conditions, Supplementary Conditions, and General Requirements (Division 01 Sections of the Specifications) apply to Work regardless of where it is described in the Contract Documents, unless specifically noted otherwise. 2. In offering a Bid for this Project and in entering into this Contract, Contractor represents: a. Contractor has studied the Contract Documents, the Work, the Site, local conditions, Laws and Regulations, and other conditions that may affect the Work; b. Contractor has studied the Technical Data and other information referred to in the Contract Documents and has or will make additional surveys and investigations as deemed necessary for the performance of the Work; C. Contractor has correlated these studies and observations with the requirements of the Contract Documents; and General Conditions 007200- 13 Corpus Christi Standards-Regular Projects 03-23-2015 d. Contractor has taken all of this information into consideration in developing the Contract Price offered and that the Contract Price offered provides full compensation for providing the Work in accordance with the Contract Documents. 3. Organization of the Contract Documents is not intended to control or lessen the responsibility of the Contractor when dividing Work among Subcontractors or Suppliers, or to establish the extent of Work to be performed by trades, Subcontractors, or Suppliers. Specifications or details do not need to be indicated or specified in each Specification or Drawing. Items shown in the Contract Documents are applicable regardless of their location in the Contract Documents. 4. Standard paragraph titles and other identifications of subject matter in the Specifications are intended to aid in locating and recognizing various requirements of the Specifications. Titles do not define, limit, or otherwise restrict Specification text. 5. Provide the labor, documentation, services, materials, or equipment that may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result, whether specifically called for in the Contract Documents or not. Include these related costs in the offered Contract Price. B. Provide equipment that is functionally complete as described in the Contract Documents. The Drawings and Specifications do not indicate or describe all of the Work required to complete the installation of products purchased by the Owner or Contractor. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the Designer through the OAR. C. Comply with the most stringent requirements where compliance with two or more standards is specified and they establish different or conflicting requirements for the Work, unless the Contract Documents indicate otherwise. D. Provide materials and equipment comparable in quality to similar materials and equipment incorporated in the Project or as required to meet the minimum requirements of the application if the materials and equipment are shown in the Drawings but are not included in the Specifications. E. The Project Record Copy of the Contract Documents governs if there is a discrepancy between the Project Record Copy of the Contract Documents and subsequent electronic or digital versions of the Contract Documents, including printed copies derived from these electronic or digital versions. F. The Contract supersedes all prior written or oral negotiations, representations, and agreements. The Contract Documents comprise the entire Agreement between Owner and Contractor. The Contract Documents may be modified only by a Modification. G. Request clarification from OAR for a decision before proceeding if Contractor is not clear on the meaning of the Contract Documents. OAR is to issue clarifications and interpretations of the Contract Documents in accordance with the Contract Documents. General Conditions 007200- 14 Corpus Christi Standards-Regular Projects 03-23-2015 3.02 Reference Standards A. Standard Specifications, Codes, Laws and Regulations: 1. Reference in the Contract Documents to standard specifications, manuals, reference standards, or codes of technical societies, organizations, or associations, or to Laws or Regulations,whether specific or implied, are those in effect at the time Contractor's Bid is submitted or when Contractor negotiates the Contract Price unless specifically stated otherwise in the Contract Documents. 2. No provision of referenced standard specifications, manuals, reference standards, codes, or instructions of a Supplier changes the duties or responsibilities of OPT or Contractor from those described in the Contract Documents or assigns a duty to or gives authority to the OPT to supervise or direct the performance of the Work or undertake responsibilities inconsistent with the Contract Documents. 3. The provisions of the Contract Documents take precedence over standard specifications, manuals, reference standards, codes, or instructions of a Supplier unless specifically stated otherwise in the Contract Documents. B. Comply with applicable construction industry standards, whether referenced or not. 1. Standards referenced in the Contract Documents govern over standards not referenced but recognized as applicable in the construction industry. 2. Comply with the requirements of the Contract Documents if they produce a higher quality of Work than the applicable construction industry standards. 3. Designer determines whether a code or standard is applicable, which of several are applicable, or if the Contract Documents produce a higher quality of Work. C. Make copies of reference standards available if requested by OAR. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: 1. Carefully study the Drawings and verify pertinent figures and dimensions with respect to actual field measurements before undertaking the Work. Immediately report conflicts, errors, ambiguities, or discrepancies that Contractor discovers or has actual knowledge of to the OAR. Do not proceed with affected Work until the conflict, error, ambiguity, or discrepancy is resolved by a clarification or interpretation from the OAR or by a Modification to the Contract Documents issued pursuant to Paragraph 11.01. 2. Immediately notify the OAR of conflicts, errors, ambiguities, or discrepancies in the Contract Documents or discrepancies between the Contract Documents and: a. Applicable Laws or Regulations; b. Actual field conditions; C. Standard specifications, manuals, reference standards, or codes; or d. Instructions of Suppliers. 3. Do not proceed with affected Work until the conflict, error, ambiguity, or discrepancy is resolved by a clarification or interpretation from the OAR or by a Modification to the General Conditions 007200- 15 Corpus Christi Standards-Regular Projects 03-23-2015 Contract Documents issued pursuant to Paragraph 11.01, except in an emergency as required by Paragraph 7.12. 4. Contractor is liable to the OPT for failure to report conflicts, errors, ambiguities, or discrepancies in the Contract Documents of which Contractor has actual knowledge. 5. Contractor is deemed to have included the most expensive item, system, procedure, etc. in the Contract Price if a conflict, error, ambiguity, or discrepancy in components of the Contract Documents was known, but not reported prior to submitting the Bid or when Contractor negotiates the Contract Price. 3.04 Interpretation of the Contract Documents A. Submit questions concerning the non-technical or contractual/administrative requirements of the Contract Documents to the OAR immediately after those questions arise. OAR is to provide an interpretation of the Contract Documents regarding these questions and will coordinate the response of the OPT to Contractor. B. Submit questions regarding the design of the Project described in the Contract Documents to the OAR immediately after those questions arise. OAR is to request an interpretation of the Contract Documents from the Designer. Designer is to respond to these questions by providing an interpretation of the Contract Documents. OAR will coordinate the response of the OPT to Contractor. C. OPT may initiate a Modification to the Contract Documents through the OAR if a response to the question indicates that a change in the Contract Documents is required. Contractor may appeal Designer's or OAR's interpretation by submitting a Change Proposal. 3.05 Reuse of Documents A. Contractor's Team has no rights to the Contract Documents and may not use the Contract Documents, or copies or electronic media editions of the Contract Documents, other than for the construction of this Project. This provision survives final payment or termination of the Contract. B. Contractor is allowed to retain a copy of the Contract Documents for record purposes, unless specifically prohibited by the Owner for security reasons. Surrender paper and digital copies of the Contract Documents and other related documents and remove these documents from computer equipment or storage devices as a condition of final payment if the Owner so directs. ARTICLE 4—COMMENCEMENT AND PROGRESS OF THE WORK 4.01 Commencement of Contract Times; Notice to Proceed A. The Contract Times commence to run on the date indicated in the Notice to Proceed. 4.02 Starting the Work A. Begin performing the Work on the date indicated in the Notice to Proceed. Do not begin Work prior to having the insurance required in Article 6 in force or before the date indicated in the Notice to Proceed. General Conditions 007200- 16 Corpus Christi Standards-Regular Projects 03-23-2015 4.03 Progress Schedule A. Construct the Work in accordance with the Progress Schedule established in accordance with the Contract Documents. 1. Adjust the Progress Schedule as required to accurately reflect actual progress on the Work. 2. Submit proposed adjustments in the Progress Schedule that change the Contract Times in accordance with the requirements of Article 11. B. Continue performing Work and adhere to the Progress Schedule during disputes or disagreements with Owner. Do not delay or postpone Work pending resolution of disputes or disagreements, or during an appeal process, except as permitted by Paragraph 16.04, or as Owner and Contractor may otherwise agree. 4.04 Delays in Contractor's Progress A. Contractor is entitled to an equitable adjustment in the Contract Times if OPT directly delays, disrupts, or interferes with the performance or progress of the Work. The Contractor agrees to make no Claim for damages for delay in the performance of the Contract occasioned by an act or omission to act of the OPT and agrees that the extension of time provides an equitable adjustment. B. Contractor is not entitled to an adjustment in Contract Price or Contract Times for delays, disruptions, or interference caused by or within the control of Contractor's Team. C. No time extensions are allowed for weather conditions, other than those listed in Paragraph 4.04.D.1, for Projects using calendar days or a fixed date to establish the Contract Time. Contractor is to include the cost associated with weather related delays in the Contract Price and assumes the risks associated with delays related to weather conditions. D. Contractor is entitled to an equitable adjustment in the Contract Times if Contractor's performance or progress is delayed, disrupted, or interfered with by unanticipated causes not the fault of and beyond the control of OPT or Contractor. These unanticipated causes may include: 1. Severe and unavoidable natural catastrophes e.g. fires, floods, hurricanes, epidemics, and earthquakes; 2. Acts or failures to act of utility owners other than those performing other work at or adjacent to the Site by arrangement with the Owner, as contemplated in Article 8; and 3. Acts of war or terrorism. 4. Rain days in excess of the number of days allocated for rain as described in the Supplementary Conditions. E. Delays, disruption, and interference to the performance or progress of the Work resulting from the following are governed by Article 5: 1. The existence of a differing subsurface or physical condition; 2. An Underground Facility not shown or not indicated with reasonable accuracy by the Contract Documents; and General Conditions 007200- 17 Corpus Christi Standards-Regular Projects 03-23-2015 3. Hazardous Environmental Conditions. These adjustments in Contract Times are the Contractor's sole and exclusive remedy for the delays, disruption, and interference described in this paragraph. F. Article 8 governs delays, disruption, and interference to the performance or progress of the Work resulting from the performance of certain other work at or adjacent to the Site. G. Notify the OAR immediately of a potential delaying, disrupting, or interfering event. Submit a Change Proposal seeking an adjustment in Contract Price or Contract Times within 30 days of the commencement of the delaying, disrupting, or interfering event. H. Contractor is only entitled to an adjustment of the Contract Times for specific delays, disruptions, and interference to the performance or progress of the Work that can be demonstrated to directly impact the ability of the Contractor to complete the Work within the Contract Times. No adjustments in Contract Times are allowed for delays on components of the Work which were or could have been completed without impacting the Contract Times. I. Contractor is not entitled to an adjustment in Contract Price or Contract Times for delay, disruption, or interference caused by or within the control of the Owner if this delay is concurrent with a delay, disruption, or interference attributable to or within the control of the Contractor's Team. ARTICLE 5—AVAILABILITY OF LANDS;SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS 5.01 Availability of Lands A. Owner is to furnish the Site and inform the Contractor of encumbrances or restrictions known to Owner related to use of the Site with which Contractor must comply in performing the Work. B. Provide for additional lands and access Contractor requires for temporary construction facilities or storage of materials and equipment, other than those identified in the Contract Documents. Provide documentation of authority to use these additional lands to OAR before using them. 5.02 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Confine construction equipment,temporary construction facilities, the storage of materials and equipment, and the operations of workers to the Site, adjacent areas that Owner or Contractor has arranged to use through construction easements or agreements, and other adjacent areas as permitted by Laws and Regulations. Assume full responsibility for damage or injuries which result from the performance of the Work or from other actions or conduct of the Contractor's Team, including: a. Damage to the Site; b. Damage to adjacent areas used for Contractor's Team's operations; C. Damage to other adjacent land or areas; and General Conditions 007200- 18 Corpus Christi Standards-Regular Projects 03-23-2015 d. Injuries and losses sustained by the owners or occupants of these lands or areas. 2. Take the following action if a damage or injury claim is made by the owner or occupant of adjacent land or area because of the performance of the Work, or because of other actions or conduct of the Contractor's Team: a. Take immediate corrective or remedial action as required by Paragraph 7.09; and b. Attempt to settle the claim through negotiations with the owner or occupant, or otherwise resolve the claim by mediation or other dispute resolution proceeding or at law. 5.03 Subsurface and Physical Conditions A. The Supplementary Conditions identify: 1. Those reports known to OPT of explorations and tests of subsurface conditions at or adjacent to the Site; 2. Those drawings known to OPT of physical conditions related to existing surface or subsurface structures at the Site, except Underground Facilities; and 3. Technical Data contained in these reports and drawings. B. Data contained in boring logs, recorded measurements of subsurface water levels, and the results of tests performed on materials described in geotechnical data reports specifically prepared for the Project and made available to Contractor are defined as Technical Data, unless Technical Data has been defined more specifically in the Supplementary Conditions. C. Contractor may rely upon the accuracy of the Technical Data contained in these reports and drawings, but these reports and drawings are not Contract Documents. Except for this reliance on Technical Data, Contractor may not rely upon or make claims against Owner's Indemnitees with respect to: 1. The completeness of reports and drawings for Contractor's purposes, including aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, or Contractor's safety precautions and programs; 2. Other data, interpretations, opinions, and information contained in these reports or shown or indicated in the drawings; or 3. Contractor's interpretation of or conclusions drawn from Technical Data or other data, interpretations, opinions, or information. 5.04 Differing Subsurface or Physical Conditions A. Notify OAR immediately, but in no event later than 3 days, after becoming aware of a subsurface or physical condition that is uncovered or revealed at the Site, and before further disturbing the subsurface or physical conditions or performing any related Work that: 1. Establishes that the Technical Data on which Contractor is entitled to rely as provided in Paragraph 5.03 is materially inaccurate; 2. Requires a change in the Drawings or Specifications; 3. Differs materially from that shown or indicated in the Contract Documents; or General Conditions 007200- 19 Corpus Christi Standards-Regular Projects 03-23-2015 4. Is of an unusual nature and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents. Do not further disturb or perform Work related to this subsurface or physical condition, except in an emergency as required by Paragraph 7.12, until permission to do so is issued by OAR. B. OAR is to notify the OPT after receiving notice of a differing subsurface or physical condition from the Contractor. Designer is to: 1. Promptly review the subsurface or physical condition; 2. Determine the necessity of OPT's obtaining additional exploration or tests with respect the subsurface or physical condition; 3. Determine if the subsurface or physical condition falls within one or more of the differing Site condition categories in Paragraph 5.04.A; 4. Prepare recommendations to OPT regarding the Contractor's resumption of Work in connection with the subsurface or physical condition in question; 5. Determine the need for changes in the Drawings or Specifications; and 6. Advise OPT of Designer's findings, conclusions, and recommendations. C. OAR is to issue a statement to Contractor regarding the subsurface or physical condition in question and recommend action as appropriate after review of Designer's findings, conclusions, and recommendations. D. Possible Contract Price and Contract Times Adjustments: 1. Contractor is entitled to an equitable adjustment in Contract Price or Contract Times to the extent that a differing subsurface or physical condition causes a change in Contractor's cost or time to perform the Work provided the condition falls within one or more of the categories described in Paragraph 5.04.A. Any adjustment in Contract Price for Work that is paid for on a unit price basis is subject to the provisions of Paragraph 13.03. 2. Contractor is not entitled to an adjustment in the Contract Price or Contract Times with respect to a subsurface or physical condition if: a. Contractor knew of the existence of the subsurface or physical condition at the time Contractor made an offer to Owner with respect to Contract Price and Contract Times; b. The existence of the subsurface or physical condition could have been discovered or revealed as a result of examinations, investigations, explorations, tests, or studies of the Site and contiguous areas expressly required by the Bidding Requirements or Contract Documents prior to when Contractor's Bid is submitted or when Contractor negotiates the Contract Price; or C. Contractor failed to give notice as required by Paragraph 5.04.A. 3. Contractor may submit a Change Proposal no later than 30 days after OAR's issuance of the OPT's statement to Contractor regarding the subsurface or physical condition in question. General Conditions 007200-20 Corpus Christi Standards-Regular Projects 03-23-2015 4. A Change Order is to be issued by the OAR if Owner and Contractor agree that Contractor is entitled to an adjustment in the Contract Price or Contract Times and agree to the amount or extent of adjustments in the Contract Price or Contract Times. 5.05 Underground Facilities A. The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or adjacent to the Site is based on information and data furnished to OPT by the owners of these Underground Facilities or by others. OPT is not responsible for the accuracy or completeness of information or data provided by others that OPT makes available to Contractor. The Contractor is responsible for: 1. Reviewing and checking available information and data regarding existing Underground Facilities at the Site; 2. Complying with Laws and Regulations related to locating Underground Facilities before beginning Work; 3. Locating Underground Facilities shown or indicated in the Contract Documents; 4. Coordinating the Work with the owners, including Owner, of Underground Facilities during construction; and 5. The safety and protection of existing Underground Facilities at or adjacent to the Site and repairing damage resulting from the Work. B. Notify the OAR and the owner of the Underground Facility immediately if an Underground Facility is uncovered or revealed at the Site that was not shown in the Contract Documents, or was not shown with reasonable accuracy in the Contract Documents. Do not further disturb conditions or perform Work affected by this discovery, except in the event of an emergency as required by Paragraph 7.12. C. The Designer is to take the following action after receiving notice from the OAR: 1. Promptly review the Underground Facility and conclude whether the Underground Facility was not shown or indicated in the Contract Documents, or was not shown or indicated with reasonable accuracy; 2. Prepare recommendations to OPT regarding the Contractor's resumption of Work in connection with this Underground Facility; 3. Determine the extent to which a change is required in the Drawings or Specifications to document the consequences of the existence or location of the Underground Facility; and 4. Advise OAR of Designer's findings, conclusions, and recommendations and provide revised Drawings and Specifications if required. D. OAR is to issue a statement to Contractor regarding the Underground Facility in question and recommend action as appropriate after review of Designer's findings, conclusions, and recommendations. E. Contractor is entitled to an equitable adjustment in the Contract Price or Contract Times as provided in Paragraphs 11.04 and 11.05 to the extent that the existing Underground Facility at the Site that was not shown or indicated in the Contract Documents, or was not shown General Conditions 007200-21 Corpus Christi Standards-Regular Projects 03-23-2015 or indicated with reasonable accuracy. Any adjustment in Contract Price for Work that is paid for on a unit price basis is subject to the provisions of Paragraph 13.03. F. Contractor is not entitled an adjustment in the Contract Price or Contract Times with respect to an existing Underground Facility at the Site if: 1. Contractor knew of the existence of the existing Underground Facility at the Site at the time Contractor made an offer to Owner with respect to Contract Price and Contract Times; 2. The existence of the existing Underground Facility at the Site could have been discovered or revealed as a result of examinations, investigations, explorations, tests, or studies of the Site and contiguous areas expressly required by the Bidding Requirements or Contract Documents prior to when Contractor's Bid is submitted or when Contractor negotiates the Contract Price; or 3. Contractor failed to give notice as required by Paragraph 5.05.B. G. Contractor may submit a Change Proposal regarding its entitlement to or the amount or extent of adjustments in the Contract Price or Contract Times no later than 30 days after OAR's issuance of OPT's statement to Contractor regarding the Underground Facility. 5.06 Hazardous Environmental Conditions at Site A. The Supplementary Conditions identify: 1. Those reports and drawings known to OPT relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site; and 2. Technical Data contained in these reports and drawings. B. Contractor may rely upon the accuracy of the Technical Data contained in reports and drawings relating to Hazardous Environmental Conditions identified in the Supplementary Conditions, but these reports and drawings are not Contract Documents. Except for the reliance on expressly identified Technical Data, Contractor may not rely upon or make claims against Owner's Indemnitees with respect to: 1. The completeness of these reports and drawings for Contractor's purposes, including aspects of the means, methods, techniques, sequences and procedures of construction to be employed by Contractor or Contractor's safety precautions and programs related to Hazardous Environmental Conditions; 2. Other data, interpretations, opinions, and information contained in these reports or shown or indicated in the drawings; or 3. Any Contractor interpretation of or conclusion drawn from Technical Data or other data, interpretations, opinions, or information. C. The results of tests performed on materials described in environmental reports specifically prepared for the Project and made available to Contractor are defined as Technical Data unless Technical Data has been defined more specifically in the Supplementary Conditions. D. Contractor is not responsible for removing or remediating Hazardous Environmental Conditions encountered, uncovered, or revealed at the Site unless this removal or General Conditions 007200-22 Corpus Christi Standards-Regular Projects 03-23-2015 remediation is expressly identified in the Contract Documents to be within the scope of the Work. E. Contractor is responsible for controlling, containing, and duly removing and remediating Constituents of Concern brought to the Site by Contractor's Team and paying associated costs. 1. Owner may remove and remediate the Hazardous Environmental Condition and impose a set-off against payments to Contractor for associated costs if Contractor's Team creates a Hazardous Environmental Condition and Contractor does not take acceptable action to remove and remediate the Hazardous Environmental Condition. 2. Contractor's obligation to indemnify Owner's Indemnitees for claims arising out of or related to Hazardous Environmental Conditions are as set forth in Paragraph 7.14. F. Immediately notify the OAR and take the following action if Contractor uncovers or reveals a Hazardous Environmental Condition at the Site or adjacent areas used by the Contractor's Team that was not created by the Contractor's Team: 1. Secure or otherwise isolate this condition; 2. Stop Work in affected areas or connected with the condition, except in an emergency as required by Paragraph 7.12; and 3. Do not resume Work in connection with the Hazardous Environmental Condition or in affected areas until after OPT has obtained required permits and OAR sends notice to the Contractor: a. Specifying that this condition and affected areas are or have been rendered safe for the resumption of Work; or b. Specifying special conditions under which Work may be resumed safely. 4. Owner may order the portion of the Work that is in the area affected by the Hazardous Environmental Condition to be deleted from the Work following the procedures in Article 11 if Contractor does not agree to: a. Resume the Work based on a reasonable belief it is unsafe; or b. Resume the Work under the special conditions provided by the OAR. 5. Owner may have this deleted portion of the Work performed by Owner's own forces or others in accordance with Article 8. G. Contractor may submit a Change Proposal or Owner may impose a set-off if an agreement is not reached within 10 days of OAR's notice regarding the resumption of Work as to whether Contractor is entitled to an adjustment in Contract Price or Contract Times or on the amount or extent of adjustments resulting from this Work stoppage or special conditions under which Contractor agrees to resume Work. H. The provisions of Paragraphs 5.03, 5.04, and 5.05 do not apply to the presence of Constituents of Concern or a Hazardous Environmental Condition uncovered or revealed at the Site. General Conditions 007200-23 Corpus Christi Standards-Regular Projects 03-23-2015 ARTICLE 6—BONDS AND INSURANCE 6.01 Performance, Payment, and Other Bonds A. Furnish Performance and Payment Bonds, each in an amount equal to the Contract Price, as security for the faithful performance and payment of Contractor's obligations under the Contract Documents. These Bonds are to remain in effect until 1 year after the date of final payment. Furnish other Bonds as required by the Contract Documents. B. Bonds furnished by the Contractor must meet the requirements of Texas Insurance Code Chapter 3503,Texas Government Code Chapter 2253, and all other applicable Laws and Regulations. C. Notify OAR immediately if the surety on Bonds furnished by Contractor: 1. Is declared bankrupt, or becomes insolvent; 2. Has its right to do business in Texas terminated; or 3. Ceases to meet the requirements of Paragraph 6.02. Provide a Bond and surety which comply with the requirements of Paragraph 6.02 within 20 days after the event giving rise to this notification. D. Contractor is to use amounts paid by Owner to Contractor under the Contract for the performance of the Contract and to satisfy claims against the Payment Bond. E. Notify the OAR of claims filed against the Payment Bond. Notify the claimant and OAR of undisputed amounts and the basis for challenging disputed amounts when a claimant has satisfied the conditions prescribed by Texas Government Code Chapter 2253. Promptly pay undisputed amount. F. Owner is not liable for payment of costs or expenses of claimants under the Payment Bond. Owner has no obligations to pay,give notice, or take other action to claimants under the Payment Bond. G. Owner may exclude the Contractor from the Site and exercise Owner's termination rights under Article 16 if Contractor fails to obtain or maintain required Bonds. H. OPT will provide a copy of the Payment Bond to Subcontractors, Suppliers, or other persons or entities claiming to have furnished labor or materials used in the performance of the Work that request this information in accordance with Texas Government Code Chapter 2253. 6.02 Licensed Sureties A. Provide Bonds in the form prescribed by the Contract Documents from sureties named in the list of"Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. B. Provide Bonds required by the Contract Documents from surety companies that are duly licensed or authorized to provide bonds in the State of Texas. General Conditions 007200-24 Corpus Christi Standards-Regular Projects 03-23-2015 6.03 Insurance A. Obtain and maintain insurance as required in this Article and in SECTION 00 72 01 INSURANCE REQUIREMENTS. B. Deliver evidence of insurance in accordance with SECTION 00 72 01 INSURANCE REQUIREMENTS to the Owner to demonstrate that Contractor has obtained and is maintaining the policies, coverages, and endorsements required by the Contract. Provide copies of these certificates to each named insured and additional insured as identified in the Supplementary Conditions or otherwise. ARTICLE 7—CONTRACTOR'S RESPONSIBILITIES 7.01 Supervision and Superintendence A. Supervise, inspect, and direct the performance of the Work in accordance with the Contract Documents. Contractor is solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. Provide a competent resident superintendent acceptable to the OPT. The resident superintendent or acceptable qualified assistant is to be present at all times when Work is being done. Do not replace this resident superintendent except under extraordinary circumstances. Provide a replacement resident superintendent equally competent to the previous resident superintendent if replacement is required. Notify the Owner prior to replacing the resident superintendent and obtain Owner's consent to the change in superintendent. 7.02 Labor; Working Hours A. Provide competent, suitably qualified personnel to survey and lay out the Work and perform Work to complete the Project. Maintain good discipline and order at the Site. B. Perform Work at the Site during regular working hours except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent to the Site and except as otherwise stated in the Contract Documents. C. Do not perform Work on a Saturday, Sunday, or legal holiday without OAR's consent. The following legal holidays are observed by the Owner: Holiday Date Observed New Year's Day January 1 Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Thanksgiving Day Fourth Thursday in November Friday after Thanksgiving Friday after Thanksgiving Christmas Day December 25 General Conditions 007200-25 Corpus Christi Standards-Regular Projects 03-23-2015 D. If a legal holiday falls on a Saturday, it will be observed the preceding Friday. If a legal holiday falls on a Sunday, it will be observed the following Monday. E. Pay additional cost incurred by Owner for services of the OAR or RPR to observe Work constructed outside of regular working hours. OAR will issue a Set-off in the Application for Payment for this cost per Paragraph 15.01.13 7.03 Services, Materials, and Equipment A. Provide services, materials, equipment, labor, transportation, construction equipment and machinery,tools, appliances, fuel, power, light, heat, telephone,water, sanitary facilities, temporary facilities, and other facilities and incidentals necessary for the performance, testing, start-up, and completion of the Work, whether or not these items are specifically called for in the Contract Documents. B. Provide new materials and equipment to be incorporated into the Work. Provide special warranties and guarantees required by the Contract Document. Provide satisfactory evidence, including reports of required tests, as to the source, kind, and quality of materials and equipment as required by the Contract Documents or as requested by the OAR. C. Store, apply, install, connect, erect, protect, use, clean, and condition materials and equipment in accordance with instructions of the applicable Supplier, unless otherwise required by the Contract Documents. 7.04 Concerning Subcontractors, Suppliers, and Others A. Contractor may retain Subcontractors and Suppliers for the performance of parts of the Work. All Subcontractors and Suppliers must be acceptable to Owner. B. Contractor must retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of designated parts of the Work if required to do so by the Contract Documents. C. Submit a list of proposed Subcontractors and Suppliers to OAR prior to entering into binding subcontracts or purchase orders. These proposed Subcontractors or Suppliers are deemed acceptable to Owner unless Owner raises a substantive, reasonable objection within 30 days after receiving this list. D. Contractor is not required to retain Subcontractors, Suppliers, or other individuals or entities to furnish or perform part of the Work after the Effective Date of the Contract if Contractor has reasonable objection. E. Owner may require the replacement of Subcontractors, Suppliers, or other individuals or entities retained by the Contractor. Provide an acceptable replacement for the rejected Subcontractor, Supplier, or other individual or entity. Owner also may require Contractor to retain specific replacements, subject to Contractor's reasonable objections. F. Contractor may be entitled to an adjustment in Contract Price or Contract Times with respect to a replacement of Subcontractors, Suppliers, or other entities required by Owner. The Contractor is not entitled to an adjustment in Contract Price or Contract Time with respect to replacement of any individual deemed unsuitable by the OPT. Notify OAR immediately if a replacement of Subcontractors, Suppliers, or other entity increases the Contract Price or Contract Times. Initiate a Change Proposal for the adjustment within 10 General Conditions 007200-26 Corpus Christi Standards-Regular Projects 03-23-2015 days of Owner's notice to replace a Subcontractor, Supplier, or other entity retained by Contractor to perform part of the Work. Do not make the replacement until the change in Contract Price or Contract Times has been accepted by the Owner if Change Proposal is to be submitted. G. Owner's initial acceptance of Subcontractors, Suppliers, or other individuals or entities, or their replacements, does not constitute a waiver of the obligation of the Contractor to complete the Work in accordance with the Contract Documents. H. Maintain a current and complete list of Subcontractors and Suppliers that are to perform or furnish part of the Work. I. Contractor is fully responsible for the acts and omissions of Subcontractors, Suppliers, and other individuals or entities performing or furnishing Work. J. Contractor is solely responsible for scheduling and coordinating the work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing Work. K. Require Subcontractors, Suppliers, and other individuals or entities performing or furnishing Work to communicate with OPT through Contractor. L. Contracts between the Contractor and their Subcontractors or Suppliers may specifically bind the Subcontractors or Suppliers to the applicable terms and conditions of the Contract Documents. Contractor is responsible for meeting the requirements of the Contract Documents if they choose to not bind the Subcontractors or Suppliers to applicable terms or conditions of the Contract Documents. 1. All Subcontractors employed on this Project must be required to obtain Workers' Compensation Insurance. 2. Proof of this insurance will be required prior to the start of any Work. M. OPT may furnish information about amounts paid to Contractor for Work provided by Subcontractors or Suppliers to the entity providing the Work. N. Nothing in the Contract Documents: 1. Creates a contractual relationship between members of the OPT and members of the Contractor's Team. 2. Creates an obligation on the part of the Owner to pay or to see to the payment of money due members of the Contractor's Team, except as may be required by Laws and Regulations. 7.05 Patent Fees and Royalties A. Pay license fees, royalties, and costs incident to the use of inventions, designs, processes, products, or devices which are patented or copyrighted by others in the performance of the Work, or to incorporate these inventions, designs, processes, products, or devices which are patented or copyrighted by others in the Work. The Contract Documents identify inventions, designs, processes, products, or devices OPT knows are patented or copyrighted by others or that its use is subject to patent rights or copyrights calling for the payment of a license fee or royalty to others. Contractor is to include the cost associated with the use of patented or copyrighted products or processes,whether specified or selected by the Contractor, in the Contract Price. General Conditions 007200-27 Corpus Christi Standards-Regular Projects 03-23-2015 B. Contractor's obligation to indemnify Owner's Indemnitees for claims arising out of or related to infringement of patent rights and copyrights are as set forth in Paragraph 7.14. 7.06 Permits A. Obtain and pay for construction permits and licenses. OPT is to assist Contractor in obtaining permits and licenses when required to do so by applicable Laws and Regulations. Pay governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time the Contractor's Bid is submitted or when Contractor negotiates the Contract Price. 7.07 Taxes A. Contractor is responsible for all taxes and duties arising out of the Work. The Owner generally qualifies as a tax exempt agency as defined by the statutes of the State of Texas and is usually not subject to any city or state sales or use taxes, however certain items such as rented equipment may be taxable even though Owner is a tax-exempt agency. Contractor is responsible for including in the Contract Price any applicable sales and use taxes and is responsible for complying with all applicable statutes and rulings of the State Comptroller. Pay sales, consumer, use, and other similar taxes required to be paid by Contractor in accordance with the Laws and Regulations. B. The Owner is exempt from the Federal Transportation and Excise Tax. Contractor must comply with all federal regulations governing the exemptions. C. Products incorporated into the Work are exempt from state sales tax according to the provisions of Subchapter H, Chapter 151, of the Texas Tax Code. D. Contractor may not include any amounts for sales, use, or similar taxes for which the Owner is exempt in the Contract Price or any proposed Change Order or Application for Payment. E. Obtain tax exemption certificates or other documentation necessary to establish Owner's exemption from such taxes. 7.08 Laws and Regulations A. Give required notices and comply with Laws and Regulations applicable to the performance of the Work. OPT is not responsible for monitoring Contractor's compliance with Laws or Regulations except where expressly required by applicable Laws and Regulations. B. Pay costs resulting from actions taken by Contractor that are contrary to Laws or Regulations. Contractor is not responsible for determining that the design aspects of the Work described in the Contract Documents is in accordance with Laws and Regulations. This does not relieve Contractor of its obligations under Paragraph 3.03. C. Owner or Contractor may give notice to the other party of changes in Laws or Regulations that may affect the cost or time of performance of the Work, including: 1. Changes in Laws or Regulations affecting procurement of permits; and 2. Sales, use, value-added, consumption, and other similar taxes which come into effect after Contractor's Bid is submitted or when Contractor negotiates the Contract Price. General Conditions 007200-28 Corpus Christi Standards-Regular Projects 03-23-2015 D. Contractor may submit a Change Proposal or Owner may initiate a Claim within 30 days of this notice if Owner and Contractor are unable to agree on entitlement to or on the amount or extent of adjustments in Contract Price or Contract Times resulting from these changes. 7.09 Safety and Protection A. Contractor is solely responsible for initiating, maintaining, and supervising safety precautions and programs in connection with the Work. This responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. B. Take necessary precautions for the safety of persons on the Site or who may be affected by the Work, and provide the necessary protection to prevent damage, injury, or loss to: 1. Work and materials and equipment to be incorporated in the Work, whether stored on or off Site; and 2. Other property at or adjacent to the Site, including trees, shrubs, lawns,walks, pavements, roadways, structures, other work in progress, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. C. Comply with applicable Laws and Regulations relating to the safety and protection of persons or property. Erect and maintain necessary safeguards for safety and protection. Notify Owner; the owners of adjacent property, Underground Facilities, and other utilities; and other contractors and utility owners performing work at or adjacent to the Site when prosecution of the Work may affect them. Cooperate with them in the protection, removal, relocation, and replacement of their property or work in progress. 1. Comply with requirements of Underground Facility Damage Prevention and Safety Act, Texas Utilities Code Chapter 251. 2. Comply with all applicable safety rules and regulations of the Federal Occupational Health and Safety Act of 1970 and subsequent amendments (OSHA). D. Remedy damage, injury, or loss to property referred to in Paragraph 7.09.B caused by Contractor's Team. Pay remediation costs unless the damage or loss is: 1. Attributable to the fault of the Contract Documents; 2. Attributable to acts or omissions of OPT; or 3. Not attributable to the actions or failure to act of the Contractor's Team. E. Contractor's duties and responsibilities for safety and protection of persons or the Work or property at or adjacent to the Site continues until Work is completed and resumes whenever Contractor's Team returns to the Site to fulfill warranty or correction obligations or to conduct other tasks. F. Comply with the applicable requirements of the Owner's safety program if required to do so in the Supplementary Conditions. A copy of the Owner's safety program will be provided in the Bidding Documents. General Conditions 007200-29 Corpus Christi Standards-Regular Projects 03-23-2015 7.10 Safety Representative A. Provide a qualified and experienced safety representative at the Site whose duties and responsibilities are the prevention of accidents and maintaining and supervising safety programs. 7.11 Hazard Communication Programs A. Coordinate the exchange of material safety data sheets or other hazard communication information required to be made available or exchanged between or among employers at the Site in accordance with Laws or Regulations. 7.12 Emergencies A. Act to prevent threatened damage, injury, or loss in emergencies affecting the safety or protection of persons or the Work or property at or adjacent to the Site. Notify OAR immediately if Contractor believes that significant changes in the Work or variations from the Contract Documents have been caused or are required as a result of this need to act. A Modification is to be issued by OAR if OPT determines that the incident giving rise to the emergency action was not the responsibility of the Contractor and that a change in the Contract Documents is required because of the action taken by Contractor in response to this emergency. 7.13 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to Owner that Work is in accordance with the Contract Documents and is not Defective. Owner is entitled to rely on Contractor's warranty and guarantee. Assume and bear responsibility for costs and time delays associated with variations from the requirements of the Contract Documents. B. This Contractor's warranty and guarantee excludes defects or damage caused by improper maintenance or operation, abuse, or modification by OPT; or normal wear and tear under normal usage. C. Contractor's obligation to perform and complete Work in accordance with the Contract Documents is absolute. None of the following constitute an acceptance of Defective Work or a release of Contractor's obligation to perform Work in accordance with the Contract Documents: 1. Observations by OPT; 2. Recommendation by OAR or payment by Owner of progress or final payments; 3. The issuance of a Certificate of Substantial Completion; 4. Use or occupancy of part of the Work by Owner; 5. Review and approval of a Shop Drawing or Sample; 6. Inspections,tests, or approvals by others; or 7. Correction of Defective Work by Owner. D. The Contract Documents may require the Contractor to accept the assignment of a contract between the Owner and a contractor or supplier. The specific warranties, guarantees, and General Conditions 007200-30 Corpus Christi Standards-Regular Projects 03-23-2015 correction obligations contained in an assigned contract govern with respect to Contractor's performance obligations to Owner for the Work described in an assigned contract. 7.14 Indemnification A. TO THE FULLEST EXTENT PERMITTED BY LAW,THE CONTRACTOR SHALL INDEMNIFY, DEFEND,AND HOLD HARMLESS THE OWNER'S INDEMNITEES FROM AND AGAINST CLAIMS, DAMAGES, LOSSES AND EXPENSES, INCLUDING BUT NOT LIMITED TO ATTORNEY'S FEES OR DISPUTE RESOLUTION COSTS, ARISING OUT OF OR RESULTING FROM PERFORMANCE OF THE WORK,VIOLATIONS OF LAWS OR REGULATIONS,OR BODILY INJURY, DEATH,OR DESTRUCTION OF TANGIBLE PROPERTY CAUSED BY THE ACTS OR OMISSIONS OF THE CONTRACTOR'S TEAM, REGARDLESS OF WHETHER SUCH CLAIM, DAMAGE, LOSS OR EXPENSE IS ALLEGED TO BE CAUSED IN PART BY AN OWNER'S INDEMNITEE HEREUNDER,SUBJECT TO THE OWNER'S DEFENSES AND LIABILITY LIMITS UNDER THE TEXAS TORT CLAIMS ACT. HOWEVER, NOTHING HEREIN SHALL BE CONSTRUED TO REQUIRE CONTRACTOR TO INDEMNIFY AN OWNER'S INDEMNITEE AGAINST A CLAIM, LOSS, DAMAGE OR EXPENSE CAUSED BY THE(I) NEGLIGENCE OR FAULT, (II) BREACH OR VIOLATION OF A STATUTE,ORDINANCE, GOVERNMENTAL REGULATION,STANDARD OR RULE,OR(III)THE BREACH OF CONTRACT BY AN OWNER'S INDEMNITEE. PROVIDED FURTHER HOWEVER,AND IN ADDITION TO THE ABOVE, CONTRACTOR INDEMNIFIES EACH OF OWNER'S INDEMNITEES AGAINST CLAIMS FOR THE BODILY INJURY OR DEATH OF AN EMPLOYEE OF THE CONTRACTOR'S TEAM OF ANY TIER EVEN IF CAUSED BY THE SOLE OR CONCURRENT NEGLIGENCE OF AN OWNER'S INDEMNITEE. B. TO THE FULLEST EXTENT PERMITTED BY LAW,CONTRACTOR SHALL INDEMNIFY, DEFEND,AND HOLD HARMLESS THE OWNER'S INDEMNITEES FROM AND AGAINST INDEMNIFIED COSTS,ARISING OUT OF OR RELATING TO:(I)THE FAILURE TO CONTROL,CONTAIN,OR REMOVE A CONSTITUENT OF CONCERN BROUGHT TO THE SITE BY CONTRACTOR'S TEAM OR A HAZARDOUS ENVIRONMENTAL CONDITION CREATED BY CONTRACTOR'S TEAM, (II)CONTRACTOR'S TEAM'S ACTION OR INACTION RELATED TO DAMAGES, DELAYS, DISRUPTIONS,OR INTERFERENCE WITH THE WORK OF OWNER'S EMPLOYEES, OTHER CONTRACTORS,OR UTILITY OWNERS PERFORMING OTHER WORK AT OR ADJACENT TO THE SITE,OR(III)THE CORRECTION OF DEFECTIVE WORK. NOTHING IN THIS PARAGRAPH OBLIGATES THE CONTRACTOR TO INDEMNIFY THE OWNER'S INDEMNITEES FROM THE CONSEQUENCES OF THE OWNER'S AND OWNER'S INDEMNITEES OWN NEGLIGENCE. PROVIDED FURTHER HOWEVER,AND IN ADDITION TO THE ABOVE,CONTRACTOR INDEMNIFIES THE OWNER'S INDEMNITEES AGAINST CLAIMS FOR THE BODILY INJURY OR DEATH OF AN EMPLOYEE OF THE CONTRACTOR'S TEAM OF ANY TIER EVEN IF CAUSED BY THE SOLE OR CONCURRENT NEGLIGENCE OF OWNER'S INDEMNITEES. C. TO THE FULLEST EXTENT PERMITTED BY LAW,CONTRACTOR SHALL INDEMNIFY, DEFEND,AND HOLD HARMLESS THE OWNER'S INDEMNITEES FROM AND AGAINST INDEMNIFIED COSTS RESULTING FROM INFRINGEMENT ON PATENT RIGHTS OR COPYRIGHTS BY CONTRACTOR'S TEAM TO THE FULLEST EXTENT PERMITTED BY LAW. D. The indemnification obligations under this paragraph are not limited by the amount or type of damages, compensation, or benefits payable by or for members of the Contractor's Team or other individuals or entities under workers' compensation acts, disability benefit acts, or other employee benefit acts in claims against Owner's Indemnitees by an employee or the survivor or personal representative of employee of Contractor's Team. General Conditions 007200-31 Corpus Christi Standards-Regular Projects 03-23-2015 E. The indemnification obligations of this Paragraph 7.14 do not extend to the liability of Designer arising out of the preparation of the Contract Documents or giving directions or instructions, or failing to give them, to the extent they are obligated to do so if that is the primary cause of the injury or damage. F. Notify the other party within 10 days if Owner or Contractor receives notice of any claim or circumstances that could give rise to an indemnified loss. The notice must include the following: 1. A description of the indemnification event in reasonable detail; 2. The basis on which indemnification may be due; and 3. The anticipated amount of the indemnified loss. This notice does not stop or prevent Owner's Indemnitees from later asserting a different basis for indemnification or a different amount of indemnified loss than that indicated in the initial notice. Owner's Indemnitees do not waive any rights to indemnification except to the extent that Contractor is prejudiced, suffers loss, or incurs expense because of the delay if Owner does not provide this notice within the 10-day period. G. Defense of Indemnification Claims: 1. Assume the defense of the claim with counsel chosen by the Contractor and pay related costs, unless Owner decides otherwise. Contractor's counsel must be acceptable to Owner. Control the defense and any negotiations to settle the claim. Advise Owner's Indemnitees as to its defense of the claim within 10 days after being notified of the indemnification request. Owner's Indemnitees may assume and control the defense If Contractor does not assume the defense. Pay all defense expenses of the Owner's Indemnitees as an indemnified loss. 2. Owner's Indemnitees may retain separate counsel to participate in, but not control, the defense and any settlement negotiations if Contractor defends the claim. Contractor may not settle the claim without the consent or agreement of Owner. Contractor may settle the claim with Owner's consent and agreement unless it: a. Would result in injunctive relief or other equitable remedies or otherwise require Owner's Indemnitees to comply with restrictions or limitations that adversely affect Owner's Indemnitees; b. Would require Owner's Indemnitees to pay amounts that Contractor does not fund in full; or C. Would not result in Owner and Owner's Indemnitees'full and complete release from all liability to the plaintiffs or claimants who are parties to or otherwise bound by the settlement. 7.15 Delegation of Professional Design Services A. Contractor is not required to provide professional design services unless these services are specifically required by the Contract Documents for a portion of the Work or unless these services are required to carry out Contractor's responsibilities for construction means, methods,techniques, sequences, and procedures. Contractor is not required to provide professional services in violation of applicable Laws and Regulations. General Conditions 007200-32 Corpus Christi Standards-Regular Projects 03-23-2015 B. The Contract Documents specify performance and design criteria related to systems, materials, or equipment if professional design services or certifications by a design professional related to systems, materials, or equipment are specifically required of Contractor. These services or certifications must be provided by the licensed Texas Professional Engineer or Registered Architect who prepares, signs, and seals drawings, calculations, specifications, certifications, Shop Drawings, and other documents. C. OPT is entitled to rely upon the adequacy, accuracy, and completeness of the services, certifications, or approvals performed by Contractor's design professionals, provided OPT has specified to Contractor the performance and design criteria that these services must satisfy. D. Pursuant to this Paragraph 7.15, Designer's review and approval of design calculations and design drawings is only for the limited purpose of checking for conformance with the performance and design criteria given and the design concepts expressed in the Contract Documents. Designer's review and approval of Shop Drawings and other documents is only for the purpose stated in the Contract Documents. E. Contractor is not responsible for the adequacy of the performance or design criteria specified by OPT. Advise OPT if the performance or design criteria are known or considered likely to be inadequate or otherwise deficient. ARTICLE 8—OTHER WORK AT THE SITE 8.01 Other Work A. Owner may arrange for other work at or adjacent to the Site which is not part of the Contractor's Work. This other work may be performed by Owner's employees or through other contractors. Utility owners may perform work on their utilities and facilities at or adjacent to the Site. Include costs associated with coordinating with entities performing other work or associated with connecting to this other work in the Contract Price if this other work is shown in the Contract Documents. B. OPT is to notify Contractor of other work prior to starting the work and provide any knowledge they have regarding the start of utility work at or adjacent to the Site to Contractor. C. Provide other contractors: 1. Proper and safe access to the Site; 2. Reasonable opportunity for the introduction and storage of materials and equipment; and 3. Reasonable opportunity to execute their work. D. Provide cutting, fitting, and patching of the Work required to properly connect or integrate with other work. Do not endanger the work of others by cutting, excavating, or otherwise altering the work of others without the consent of OAR and the others whose work will be affected. E. Inspect the work of others and immediately notify OAR if the proper execution of part of Contractor's Work depends upon work performed by others and this work has not been performed or is unsuitable for the proper execution of Contractor's Work. Contractor's General Conditions 007200-33 Corpus Christi Standards-Regular Projects 03-23-2015 failure to notify the OAR constitutes an acceptance of this other work as acceptable for integration with Contractor's Work. This acceptance does not apply to latent defects or deficiencies in the work of others. F. Take adequate measures to prevent damages, delays, disruptions, or interference with the work of Owner, other contractors, or utility owners performing other work at or adjacent to the Site. 8.02 Coordination A. Owner has sole authority and responsibility for coordination of this other work unless otherwise provided in the Contract Documents. The Owner is to identify the entity with authority and responsibility for coordination of the activities of the various contractors, the limitations of their authority, and the work to be coordinated prior to the start of other work at or adjacent to the Site. 8.03 Legal Relationships A. Contractor may be entitled to a change in Contract Price or Contract Times if, while performing other work at or adjacent to the Site for Owner, the OPT, other contractor, or utility owner: 1. Damages the Work or property of Contractor's Team; 2. Delays, disrupts, or interferes with the execution of the Work; or 3. Increases the scope or cost of performing the Work through their actions or inaction. B. Notify the OAR immediately of the event leading to a potential Change Proposal so corrective action can be taken. Submit the Change Proposal within 30 days of the event if corrective action has not adequately mitigated the impact of the actions or inactions of others. Information regarding this other work in the Contract Documents is used to determine if the Contractor is entitled to a change in Contract Price or Contract Times. Changes in Contract Price require that Contractor assign rights against the other contractor or utility owner to Owner with respect to the damage, delay, disruption, or interference that is the subject of the adjustment. Changes in Contract Times require that the time extension is essential to Contractor's ability to complete the Work within the Contract Times. C. Take prompt corrective action if Contractor's Team damages, delays, disrupts, or interferes with the work of Owner's employees, other contractors, or utility owners performing other work at or adjacent to the Site or agree to compensate other contractors or utility owners for correcting the damage. Promptly attempt to settle claims with other contractors or utility owners if Contractor damages, delays, disrupts, or interferes with the work of other contractors or utility owners performing other work at or adjacent to the Site. D. Owner may impose a set-off against payments due to Contractor and assign the Owner's contractual rights against Contractor with respect to the breach of the obligations described in this Paragraph 8.03 to other contractors or utility owners if damages, delays, disruptions, or interference occur. General Conditions 007200-34 Corpus Christi Standards-Regular Projects 03-23-2015 E. Contractor's obligation to indemnify Owner's Indemnitees for claims arising out of or related damages, delays, disruptions, and interference with other work at the Site are as set forth in Paragraph 7.14. ARTICLE 9—OWNER'S AND OPT'S RESPONSIBILITIES 9.01 Communications to Contractor A. OPT issues communications to Contractor through OAR except as otherwise provided in the Contract Documents. 9.02 Replacement of Owner's Project Team Members A. Owner may replace members of the OPT at its discretion. 9.03 Furnish Data A. OPT is to furnish the data required of OPT under the Contract Documents. 9.04 Pay When Due A. Owner is to make payments to Contractor when due as described in Paragraphs 15.01.D and 15.06.D. 9.05 Lands and Easements; Reports and Tests A. Owner's duties with respect to providing lands and easements are described in Paragraph 5.01. OPT will make copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at the Site available to Contractor in accordance with Paragraph 5.03. 9.06 Insurance A. Owner's responsibilities with respect to purchasing and maintaining insurance are described in Article 6. 9.07 Modifications A. Owner's responsibilities with respect to Modifications are described in Article 11. 9.08 Inspections,Tests, and Approvals A. OPT's responsibility with respect to certain inspections, tests, and approvals are described in Paragraph 14.02. 9.09 Limitations on OPT's Responsibilities A. The OPT does not supervise, direct, or have control or authority over, and is not responsible for Contractor's means, methods, techniques, sequences, or procedures of construction, or related safety precautions and programs, or for failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. OPT is not responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. General Conditions 007200-35 Corpus Christi Standards-Regular Projects 03-23-2015 9.10 Undisclosed Hazardous Environmental Condition A. OPT's responsibility for undisclosed Hazardous Environmental Conditions is described in Paragraph 5.06. 9.11 Compliance with Safety Program A. Contractor is to inform the OPT of its safety programs and OPT is to comply with the specific applicable requirements of this program. ARTICLE 10—OAR'S AND DESIGNER'S STATUS DURING CONSTRUCTION 10.01 Owner's Representative A. OAR is Owner's representative. The duties and responsibilities and the limitations of authority of OAR as Owner's representative are described in the Contract Documents. 10.02 Visits to Site A. Designer is to make periodic visits to the Site to observe the progress and quality of the Work. Designer is to determine, in general, if the Work is proceeding in accordance with the Contract Documents based on observations made during these visits. Designer is not required to make exhaustive or continuous inspections to check the quality or quantity of the Work. Designer is to inform the OPT of issues or concerns and OAR is to work with Contractor to address these issues or concerns. Designer's visits and observations are subject to the limitations on Designer's authority and responsibility described in Paragraphs 9.09 and 10.07. B. OAR is to observe the Work to check the quality and quantity of Work, implement Owner's quality assurance program, and administer the Contract as Owner's representative as described in the Contract Documents. OAR's visits and observations are subject to the limitations on OAR's authority and responsibility described in Paragraphs 9.09 and 10.07. 10.03 Resident Project Representatives A. Resident Project Representatives assist OAR in observing the progress and quality of the Work at the Site. The limitations on Resident Project Representatives' authority and responsibility are described in Paragraphs 9.09 and 10.07. 10.04 Rejecting Defective Work A. OPT has the authority to reject Work in accordance with Article 14. OAR is to issue a Defective Work Notice to Contractor and document when Defective Work has been corrected or accepted in accordance with Article 14. 10.05 Shop Drawings, Modifications and Payments A. Designer's authority related to Shop Drawings and Samples are described in the Contract Documents. B. Designer's authority related to design calculations and design drawings submitted in response to a delegation of professional design services are described in Paragraph 7.15. General Conditions 007200-36 Corpus Christi Standards-Regular Projects 03-23-2015 C. OAR and Designer's authority related to Modifications is described in Articles 11. D. OAR's authority related to Applications for Payment is described in Articles 13 and 15. 10.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. OAR is to render decisions regarding non-technical or contractual/administrative requirements of the Contract Documents and will coordinate the response of the OPT to Contractor. B. Designer is to render decisions regarding the conformance of the Work to the requirements of the Contract Documents. Designer will render a decision to either correct the Defective Work, or accept the Work under the provisions of Paragraph 14.04, if Work does not conform to the Contract Documents. OAR will coordinate the response of the OPT to Contractor. C. OAR will issue a Request for a Change Proposal if a Modification is required. OAR will provide documentation for changes related to the non-technical or contractual/ administrative requirements of the Contract Documents. Designer will provide documentation if design related changes are required. D. Contractor may appeal Designer's decision by submitting a Change Proposal if Contractor does not agree with the Designer's decision. 10.07 Limitations on OAR's and Designer's Authority and Responsibilities A. OPT is not responsible for the acts or omissions of Contractor's Team. No actions or failure to act, or decisions made in good faith to exercise or not exercise the authority or responsibility available under the Contract Documents creates a duty in contract, tort, or otherwise of the OPT to the Contractor or members of the Contractor's Team. ARTICLE 11—AMENDING THE CONTRACT DOCUMENTS; CHANGES IN THE WORK 11.01 Amending and Supplementing the Contract Documents A. The Contract Documents may be modified by a Contract Amendment, Change Order, Work Change Directive, or Field Order. 1. Contract Amendment: Owner and Contractor may modify the terms and conditions of the Contract Documents without the recommendation of the Designer using a Contract Amendment. A Contract Amendment may be used for: a. Changes that do not involve: 1) The performance or acceptability of the Work; 2) The design as described in the Drawings, Specifications, or otherwise; or 3) Other engineering, architectural or technical matters. b. Authorizing new phases of the Work and establishing the Contract Price, Contract Times, or terms and conditions of the Contract for the new phase of Work when using phased construction or purchasing Goods and Special Services to be incorporated into the Project. General Conditions 007200-37 Corpus Christi Standards-Regular Projects 03-23-2015 2. Change Order: All changes to the Contract Documents that include a change in the Contract Price or the Contract Times for previously authorized Work, or changes to the Work requiring Designer's approval must be made by a Change Order. A Change Order may also be used to establish modifications of the Contract Documents that do not affect the Contract Price or Contract Times. 3. Work Change Directive: A Work Change Directive does not change the Contract Price or the Contract Times, but is evidence that the parties expect that the modifications ordered or documented by a Work Change Directive are to be incorporated in a subsequently issued Change Order following negotiations on the Contract Price and Contract Times. Contractor must submit a Change Proposal seeking an adjustment of the Contract Price or the Contract Times no later than 30 days after the completion of the Work set out in the Work Change Directive if negotiations are unsuccessful under the terms of the Contract Documents governing adjustments, expressly including Paragraphs 11.04 and 11.05. 4. Field Order: Designer may require minor changes in the Work that do not change the Contract Price or Contract Times using a Field Order. OAR may issue a Field Order for non-technical, administrative issues. Submit a Change Proposal if Contractor believes that a Field Order justifies an adjustment in the Contract Price or Contract Times before proceeding with the Work described in the Field Order. B. Perform added or revised Work under the applicable provisions of the Contract Documents for the same or similar Work unless different Drawings, Specifications, or directions are provided in the Modification. 11.02 Owner-Authorized Changes in the Work A. Owner may order additions, deletions, or revisions in the Work at any time as recommended by the Designer to the extent the change: 1. Involves the design as described in the Contract Documents; 2. Involves acceptance of the Work; or 3. Involves other engineering, architectural or technical matters. B. These changes may be authorized by a Modification. Proceed with the Work involved or, in the case of a deletion in the Work, immediately cease construction activities with respect to the deleted Work upon receipt of the Modification. Nothing in this paragraph obligates the Contractor to undertake Work that Contractor reasonably concludes cannot be performed in a manner consistent with Contractor's safety obligations under the Contract Documents or Laws and Regulations. 11.03 Unauthorized Changes in the Work A. Contractor is not entitled to an increase in the Contract Price or an extension of the Contract Times with respect to Work performed that is not required by the Contract Documents, except in the case of an emergency as provided in Paragraph 7.12, or in the case of uncovering Work as provided in Paragraph 14.05. General Conditions 007200-38 Corpus Christi Standards-Regular Projects 03-23-2015 B. Contractor is responsible for costs and time delays associated with variations from the requirements of the Contract Documents unless the variations are specifically approved by Change Order. 11.04 Change of Contract Price A. The Contract Price can only be changed by a Change Order. Any Change Proposal for an adjustment in the Contract Price must comply with the provisions of Paragraph 11.06. Any Claim for an adjustment of Contract Price must comply with the provisions of Article 12. B. An adjustment in the Contract Price is to be determined as follows: 1. By applying unit prices to the quantities of the items involved, subject to the provisions of Paragraph 13.03,where the Work involved is covered by unit prices in the Contract Documents; 2. By a mutually agreed lump sum where the Work involved is not covered by unit prices in the Contract Documents; or 3. Payment on the basis of the Cost of the Work determined as provided in Paragraph 13.01 plus a Contractor's fee for overhead and profit determined as provided in Paragraph 11.04.D when the Work involved is not covered by unit prices in the Contract Documents or the parties do not reach a mutual agreement to a lump sum. C. The original Contract Price may not be increased by more than 25 percent or the limit set out in Texas Local Government Code 252.048 or its successor statute. Owner may decrease the Work by up to 25 percent of the Contract Price without adjusting Contractor's fee. D. Contractor's Fee: Determine the Contractor's fee for overhead and profit as follows: 1. A mutually acceptable fixed fee; or 2. A fee based on the following percentages of the various portions of the Cost of the Work: a. The Contractor's fee is 15 percent for costs incurred under Paragraphs 13.01.C.1 and 13.01.C.2; b. The Contractor's fee is 5 percent for costs incurred under Paragraph 13.01.C.3; C. Fees are to be determined as follows where one or more tiers of subcontracts are used: 1) The Subcontractor's fee is 15 percent for costs incurred under Paragraphs 13.01.C.1 and 13.01.C.2 for the Subcontractor that actually performs the Work at whatever tier; and 2) The Contractor and Subcontractors of a tier higher than that of the Subcontractor that actually performs the Work are to be allowed a fee of 5 percent of the fee plus underlying costs incurred by the next lower tier Subcontractor; d. No fee is payable on the basis of costs itemized under Paragraphs 13.01.C.4, and 13.01.D; e. Five percent of the net decrease in the cost is to be deducted for changes which result in a net decrease in Contract Price; and General Conditions 007200-39 Corpus Christi Standards-Regular Projects 03-23-2015 3. The adjustment in Contractor's fee is based on the net change in accordance with Paragraphs 11.04.D.2.a through 11.04.D.2.e, inclusive when both additions and credits are involved in any one change. 11.05 Change of Contract Times A. The Contract Times can only be changed by Change Order. Any Change Proposal for an adjustment in the Contract Times must comply with the provisions of Paragraph 11.06. Any Claim for an adjustment in the Contract Times must comply with the provisions of Article 12. B. An adjustment of the Contract Times is subject to the limitations described in Paragraph 4.04. 11.06 Change Proposals A. Submit a Change Proposal to the OAR to: 1. Request an adjustment in the Contract Price or Contract Times; 2. Appeal an initial decision by OPT concerning the requirements of the Contract Documents or relating to the acceptability of the Work under the Contract Documents; 3. Contest a set-off against payment due; or 4. Seek other relief under the Contract Documents. B. Notify the OAR immediately if a Change Proposal is to be submitted. Submit each Change Proposal to OAR no later than 30 days after the event initiating the Change Proposal. Submit the following as part of the Change Proposal: 1. Any proposed change in Contract Price, Contract Times, or other relief, accompanied by a statement that the requested Change Order is the entire adjustment to which Contractor believes it is entitled; 2. The reason for the proposed change; and 3. Supporting data, accompanied by a statement that the supporting data is accurate and complete. C. OAR is to advise OPT regarding the Change Proposal. OPT is to review each Change Proposal and Contractor's supporting data, and within 30 days after receipt of the documents, direct the OAR to either approve or deny the Change Proposal in whole or in part. OAR is to issue a Change Order for an approved Change Proposal. The Contractor may deem the Change Proposal to be denied if OAR does not take action on the Change Proposal within 30 days and start the time for appeal of the denial under Article 12. 11.07 Execution of Change Orders A. Owner and Contractor are to execute Change Orders covering: 1. Changes in the Contract Price or Contract Times which are agreed to by Owner and Contractor, including undisputed sums or amount of time for Work actually performed in accordance with a Work Change Directive; General Conditions 007200-40 Corpus Christi Standards-Regular Projects 03-23-2015 2. Changes in Contract Price resulting from Owner set-offs unless the set-off has been successfully challenged by Contractor; 3. Changes in the Work which are: a. Ordered by Owner pursuant to Paragraph 11.02.A, b. Required because Defective Work was accepted under Paragraph 14.04 or Owner's correction of Defective Work under Paragraph 14.07, or C. Agreed to by the Owner and Contractor; and 4. Changes in the Contract Price or Contract Times, or other changes under Paragraph 11.06 or Article 12. B. Acceptance of a Change Order by Contractor constitutes a full accord and satisfaction for any and all claims and costs of any kind, whether direct or indirect, including but not limited to impact, delay, or acceleration damages arising from the subject matter of the Change Order. Each Change Order must be specific and final as to prices and extensions of time, with no reservations or other provisions allowing for future additional money or time as a result of the particular changes identified and fully compensated in the Change Order. The execution of a Change Order by Contractor constitutes conclusive evidence of Contractor's agreement to the ordered changes in the Work. This Contract, as amended, forever releases any claim against Owner for additional time or compensation for matters relating to or arising out of or resulting from the Work included within or affected by the executed Change Order. This release applies to claims related to the cumulative impact of all Change Orders and to any claim related to the effect of a change on unchanged Work. C. All Change Orders require approval by either the City Council or Owner by administrative action. The approval process requires a minimum of 45 days after submission in final form with all supporting data. Receipt of Contractor's submission by Owner constitutes neither acceptance nor approval of a Bid, nor a warranty that the Bid will be authorized by City Council or administrative action. The time required for the approval process may not be considered a delay and no extensions to the Contract Times or increase in the Contract Price will be considered or granted as a result of the process. Contractor may proceed with Work if a Work Change Directive is issued. D. A Change Order is deemed to be in full force as if executed by Contractor if the Contractor refuses to execute a Change Order that is required to be executed under the terms of this Paragraph 11.07. 11.08 Notice to Surety A. Notify the surety of Modifications affecting the general scope of the Work, changes in the provisions of the Contract Documents, or changes in Contract Price or Contract Times. Adjust the amount of each Bond when Modifications change the Contract Price. General Conditions 007200-41 Corpus Christi Standards-Regular Projects 03-23-2015 ARTICLE 12—CLAIMS 12.01 Claims A. Follow the Claims process described in this Article for the following disputes between Owner and Contractor: 1. A demand or assertion by Owner to Contractor, submitted in accordance with the requirements of the Contract Documents: a. Seeking an adjustment of Contract Price or Contract Times; b. Contesting an initial decision by Designer concerning the requirements of the Contract Documents or the acceptability of Work under the Contract Documents; C. Contesting Designer's decision regarding a Change Proposal; d. Seeking resolution of a contractual issue that OAR has declined to address; or e. Seeking other relief with respect to the terms of the Contract. 2. A demand or assertion by Contractor to Owner, submitted in accordance with the requirements of the Contract Documents: a. Contesting OPT's decision regarding a Change Proposal; or b. Seeking resolution of a contractual issue that OPT has declined to address. 12.02 Claims Process A. Claims must be initiated by written notice. B. Claims by Contractor must be in writing and delivered to the Owner, Designer, and the OAR within 7 days: 1. After the start of the event giving rise to the Claim; or 2. After a final decision on a Change Proposal has been made. C. Claims by Owner must be submitted by written notice to Contractor. D. The responsibility to substantiate a Claim rests with the entity making the Claim. E. In the case of a Claim by Contractor seeking an increase in the Contract Price or Contract Times, Contractor must certify that the Claim is made in good faith, that the supporting data is accurate and complete, and that to the best of Contractor's knowledge and belief, the amount of time or money requested accurately reflects the full amount to which Contractor is entitled. F. The entity receiving a Claim is to review the Claim giving full consideration to its merits. The Owner and Contractor are to seek to resolve the Claim through the exchange of information and direct negotiations. The Owner and Contractor may extend the time for resolving the Claim by mutual agreement. Notify OAR of actions taken on a Claim. G. Owner and Contractor may mutually agree to mediate the underlying dispute at any time after initiation of a Claim. 1. The agreement to mediate suspends the Claim submittal and response process. General Conditions 007200-42 Corpus Christi Standards-Regular Projects 03-23-2015 2. Owner or Contractor may unilaterally terminate the mediation process after 60 days from the agreement to mediate and resume the Claim submittal and decision process as of the date of the termination. The Claim process resumes as of the date of the conclusion of the mediation, as determined by the mediator, if the mediation is unsuccessful in resolving the dispute. 3. Owner and Contractor are to each pay one-half of the mediator's fees and costs. H. If the entity receiving a Claim approves the Claim in part or denies it in part,this action is final and binding unless the other entity invokes the procedure described in Article 17 for final resolution of disputes within 30 days of this action. I. Notify the OAR if efforts to resolve the Claim are not successful, and the Claim is denied. A denial of the Claim is final and binding unless the other entity invokes the procedure described in Article 17 for the final resolution of disputes within 30 days of the denial. J. The results of the agreement or action on the Claim is to be incorporated in a Change Order by the OAR to the extent they affect the Contract Documents,the Contract Price, or the Contract Times if the Owner and Contractor reach a mutual agreement regarding a Claim. ARTICLE 13—COST OF THE WORK;ALLOWANCES; UNIT PRICE WORK 13.01 Cost of the Work A. The Cost of the Work is the sum of costs described in this Paragraph 13.01, except those excluded in Paragraph 13.01.D, necessary for the proper performance of the Work. The provisions of this Paragraph 13.01 are used for two distinct purposes: 1. To determine Cost of the Work when Cost of the Work is a component of the Contract Price under cost-plus, time-and-materials, or other cost-based terms; or 2. To determine the value of a Change Order, Change Proposal, Claim, set-off, or other adjustment in Contract Price. B. Contractor is entitled only to those additional or incremental costs required because of the change in the Work or because of the event giving rise to the adjustment when the value of the adjustment is determined on the basis of the Cost of the Work. C. Costs included in the Cost of the Work may not exceed the prevailing costs in the proximate area of the Site for similar work unless agreed to by the Owner. Cost of the Work includes only the following items: 1. Payroll costs for Contractor's employees performing the Work, including one foreman per crew, and other required and agreed upon personnel for the time they are employed on the Work. Employees are to be paid according to wage rates for job classifications as agreed to by Owner. Where the Cost of the Work is being used under provisions of Paragraph 13.01.A.2, rates paid for this Work are to be the same as paid for Contract Work as established by certified payroll. Payroll costs may include: a. Actual costs paid for salaries and wages; b. Actual cost paid for fringe benefits, which may include: 1) Social security contributions, General Conditions 007200-43 Corpus Christi Standards-Regular Projects 03-23-2015 2) Unemployment, 3) Excise and payroll taxes, 4) Workers' compensation, 5) Health and retirement benefits, 6) Bonuses, and 7) Paid time off for sick leave, vacations, and holidays; and C. Actual cost of additional compensation paid for performing Work outside of regular working hours, on Saturday, Sunday, or legal holidays,to the extent authorized by Owner. 2. Cost of materials and equipment furnished and incorporated in the Work, including transportation and storage costs and required Suppliers' field services. Contractor may retain cash discounts unless Owner provided funds to the Contractor for early payment of these materials and equipment. Cash discounts are to be credited to Owner if the Owner provides funds for early payment. Make provisions for trade discounts, rebates, refunds, and returns from sale of surplus materials and equipment and reduce the Cost of the Work by these amounts. 3. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. Obtain competitive bids from Subcontractors acceptable to Owner unless Owner agrees to use Subcontractors proposed by the Contractor. Bids are to be opened in the presence of the OAR and other designated members for the OPT. Provide copies of bids to the OAR to use in determining, with the OPT, which bids are acceptable. The Subcontractor's Cost of the Work and fee are determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 13.01 if the subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee. 4. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work; b. Costs of materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site including transportation and maintenance costs; C. Costs of hand tools not owned by the workers consumed in the performance of the Work. Costs of hand tools not owned by the workers which are used but not consumed in the performance of the Work and which remain the property of Contractor, less their market value when Work is completed; d. Rental of construction equipment, including the costs of transporting, loading, unloading, assembling, dismantling, and removing construction equipment, whether rented from Contractor or others, in accordance with rental agreements approved by Owner. Costs for rental of equipment will not be paid when the equipment is no longer necessary for the Work. Justify idle time for equipment by demonstrating that it was necessary to keep equipment on Site for related future Work; General Conditions 007200-44 Corpus Christi Standards-Regular Projects 03-23-2015 e. Applicable sales, consumer, use, and other similar taxes related to the Work for which the Owner is not exempt, and which Contractor pays consistent with Laws and Regulations; f. Deposits lost for causes other than negligence of Contractor's Team; g. Royalty payments and fees for permits and licenses; h. Cost of additional utilities, fuel, and sanitary facilities at the Site; i. Minor expense items directly required by the Work; and j. Premiums for Bonds and insurance required by the Contract Documents. D. The Cost of the Work does not include the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals of partnerships and sole proprietorships, general managers, safety managers, superintendents, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, clerks, and other personnel employed by Contractor, whether at the Site or in Contractor's principal or branch office, for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 13.01.C.1 or specifically covered by Paragraph 13.01.C.4. These administrative costs are covered by the Contractor's fee. 2. Office expenses other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the actions of Contractor's Team for the correction of Defective Work, disposal of materials or equipment that do not comply with Specifications, and correcting damage to property. 5. Losses, damages, and related expenses caused by damage to the Work or sustained by Contractor in connection with the performance of the Work. Contractor is entitled to recover costs if covered by insurance provided in accordance with Article 6. Such losses may include settlements made with the approval of Owner. Do not include these losses, damages, and expenses in the Cost of the Work when determining Contractor's fee. 6. Any Indemnified Cost paid with regard to Contractor's indemnification of Owner's Indemnitees. 7. Other overhead or general expense costs and the costs of items not described in Paragraphs 13.01.C. E. The Contractor's fee is determined as follows: 1. In accordance with the Agreement when the Work is performed on a cost-plus basis. 2. In accordance with Paragraph 11.04.0 for Work covered by a Modification determined on the basis of Cost of the Work. F. Establish and maintain records in accordance with generally accepted accounting practices and submit these records, including an itemized cost breakdown together with supporting General Conditions 007200-45 Corpus Christi Standards-Regular Projects 03-23-2015 data, in a form and at intervals acceptable to OAR whenever the Cost of the Work is to be determined pursuant to this Paragraph 13.01. 13.02 Allowances A. Include allowances specified in the Contract Documents in the Contract Price and provide Work covered by the allowance as authorized by the Owner through the OAR. B. Contractor agrees that: 1. The cash allowance is used to compensate the Contractor for the cost of furnishing materials and equipment for the Work covered by the allowance item in the Contract Documents. Cost may include applicable taxes. Make provisions for trade discounts, rebates, and refunds and reduce the allowance costs by these amounts. 2. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the cash allowances have been included in the Contract Price and not in the allowances; and 3. Costs for cash allowances and installation costs as described in Paragraphs 13.02.13.1 and 13.02.13.2 above are included in the Contract Price. C. OAR will issue a Change Order to adjust the Contract Price by the difference between the allowance amount and the actual amount paid by Contractor for Work covered by the allowance. The Change Order will be issued at the time costs are incurred by Contractor for Work covered by the allowance and this Work is included on the Application for Payment. 13.03 Unit Price Work A. The initial Contract Price for Unit Price Work is equal to the sum of the unit price line items in the Agreement. Each unit price line item amount is equal to the product of the unit price for each line item times the estimated quantity of each item as indicated in the Agreement. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparing Bids and determining an initial Contract Price. Payments to Contractor for Unit Price Work are to be based on actual quantities measured for Work in place. C. Each unit price is deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. D. OAR is to determine the actual quantities and classifications of Unit Price Work performed by Contractor to be incorporated into each Application for Payment. OAR's decision on actual quantities is final and binding, subject to the provisions of Paragraph 13.03.E. E. Contractor may submit a Change Proposal, or Owner may file a Claim, seeking an adjustment in the Contract Price within 30 days of OAR's decision under Paragraph 13.03.D, if: 1. The total cost of a particular item of Unit Price Work amounts to 20 percent or more of the total Contract Price and the variation in the quantity of that particular item of Unit Price Work performed by the Contractor differs by more than 20 percent from the estimated quantity of an item indicated in the Agreement; 2. There is no corresponding adjustment with respect to other items of Work; and General Conditions 007200-46 Corpus Christi Standards-Regular Projects 03-23-2015 3. Contractor believes it has incurred additional expense as a result of this condition or if Owner believes that the quantity variation entitles Owner to an adjustment in the Contract Price. 13.04 Contingencies A. Contingency funds may be included in the Contract Price to pay for Work not defined specifically by the Contract Documents that is essential to the completion of the Project. Contingency funds will be as described in the Agreement. B. The contingency funds may be used for costs incurred by the Contractor provided these costs are approved by the Owner. Costs are to be determined and documented in accordance with Paragraph 13.01. The contingency funds are not to be used for the following items: 1. Cost overruns due to changes in material costs after the Contract Price is established, unless specific price escalation provisions are made in the Agreement. 2. Rework required to correct Defective Work. 3. Inefficiencies in completing the Work due to the Contractor's selected means, methods, sequences, or procedures of construction. 4. Work Contractor failed to include in the Contract Price. 5. Changes required by changes in Laws and Regulations enacted after the Contract Price is established. 6. Any Work that does not constitute a change in Scope in the Work included in the Contract Price. C. OAR is to issue a Change Order for approved expenditures from contingency funds. When the Change Order is issued, the costs are to be added to the Application for Payment. Contractor is to maintain a tabulation showing the contingency amount, adjustments to the contingency amount, and amounts remaining as the Project progresses. D. Any contingency amounts that are not included in a Change Order are retained by the Owner. A Change Order will be issued to deduct unused contingency amounts from the Contract Price prior to Final Payment. ARTICLE 14—TESTS AND INSPECTIONS; CORRECTION, REMOVAL,OR ACCEPTANCE OF DEFECTIVE WORK 14.01 Access to Work A. Provide safe access to the Site and the Work for the observation, inspection, and testing of the Work in progress. Contractor can require compliance with Contractor's safety procedures and programs as part of providing safe access. 14.02 Tests, Inspections, and Approvals A. OPT may retain and pay for the services of an independent inspector,testing laboratory, or other qualified individual or entity to perform inspections. Notify OAR when the Work is ready for required inspections and tests. Provide adequate notice to allow for coordination General Conditions 007200-47 Corpus Christi Standards-Regular Projects 03-23-2015 with entities providing inspection or testing as determined by the OAR. Cooperate with inspection and testing personnel and assist with providing access for required inspections, tests, and handling test specimens or Samples. B. Arrange for and facilitate inspections, tests, and approvals required by Laws or Regulations of governmental entities having jurisdiction that require Work to be inspected,tested, or approved by an employee or other representative of that entity. Pay associated costs and furnish OAR with the required certificates of inspection or approval. C. Arrange, obtain, and pay for inspections and tests required: 1. By the Contract Documents, unless the Contract Documents expressly allocate responsibility for a specific inspection or test to OPT; 2. To attain OPT's acceptance of materials or equipment to be incorporated in the Work; 3. By manufacturers of equipment furnished under the Contract Documents; 4. For testing, adjusting, and balancing of mechanical, electrical, and other equipment to be incorporated into the Work; 5. For acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work; 6. For re-inspecting or retesting Defective Work, including any associated costs incurred by the testing laboratory for cancelled tests or standby time; and 7. For retesting due to failed tests. D. Provide independent inspectors,testing laboratories, or other qualified individuals or entities acceptable to OPT to provide these inspections and tests. 14.03 Defective Work A. It is Contractor's obligation to assure that the Work is not Defective. B. OPT has the authority to determine whether Work is Defective and to reject Defective Work. C. OAR is to notify Contractor of Defective Work of which OPT has actual knowledge. D. Promptly correct Defective Work. E. Take no action that would void or otherwise impair Owner's special warranties or guarantees when correcting Defective Work. F. Pay claims, costs, losses, and damages arising out of or relating to Defective Work, including: 1. Costs for correction, removal, and replacement of Defective Work; 2. Cost of the inspection and testing related to correction of Defective Work; 3. Fines levied against Owner by governmental authorities because of Defective Work; and 4. Costs of repair or replacement of work of others resulting from Defective Work. General Conditions 007200-48 Corpus Christi Standards-Regular Projects 03-23-2015 14.04 Acceptance of Defective Work A. Owner may elect to accept Defective Work instead of requiring correction or removal and replacement of Defective Work provided: 1. This acceptance occurs prior to final payment; 2. Designer confirms that the Defective Work is in general accordance with the design intent and applicable engineering or architectural principles; and 3. Designer confirms that acceptance of the Defective Work does not endanger public health or safety. B. Owner may impose a reasonable set-off against payments due under Article 15 for costs associated with OPT's evaluation of Defective Work to determine if it can be accepted and to determine the diminished value of the Work. Owner may impose a reasonable set-off against payments due under Article 15 if the parties are unable to agree as to the decrease in the Contract Price to compensate Owner for the diminished value of Defective Work accepted. OAR is to issue a Modification for acceptance of the Defective Work prior to final payment. Pay an appropriate amount to Owner if the acceptance of Defective Work occurs after final payment. 14.05 Uncovering Work A. OPT has the authority to require inspection or testing of the Work,whether or not the Work is fabricated, installed, or completed. B. Work that is covered prior to approval of the OAR must be uncovered for OPT's observation if requested by OAR. Pay for uncovering Work and its subsequent restoration unless Contractor has given OAR timely notice of Contractor's intention to cover the Work and OAR fails to act with reasonable promptness in response to this notice. C. Provide necessary labor, material, and equipment and uncover, expose, or otherwise make available the portion of the Work suspected of being Defective for observation, inspection, or testing if OPT considers it necessary or advisable that covered Work be observed by Designer or inspected or tested by others as directed by the OAR. 1. Pay for claims, costs, losses, and damages associated with uncovering, exposing, observing, inspecting, and testing if it is found that the uncovered Work is Defective. Pay costs for correction of Defective Work. Pay for reconstruction, repair, or replacement of work of others if it is found that the uncovered Work is Defective. 2. Submit a Change Proposal for an increase in the Contract Price or an extension of the Contract Times directly attributable to this uncovering, exposure, observation, inspection,testing, and reconstruction if the uncovered Work is found to be not Defective. 14.06 Owner May Stop the Work A. Owner may order Contractor to stop the Work if: 1. The Work is Defective; 2. Contractor fails to supply sufficient skilled workers or suitable materials or equipment; or General Conditions 007200-49 Corpus Christi Standards-Regular Projects 03-23-2015 3. Contractor performs Work that may fail to conform to the Contract Documents when completed. This stop work order is to remain in effect until the reason for the stop work order has been eliminated. Owner's right to stop the Work does not create a duty to exercise this right for the benefit of Contractor's Team or surety. 14.07 Owner May Correct Defective Work A. Owner may remedy the following deficiencies after 7 days' notice to Contractor if: 1. Contractor fails to correct Defective Work, or to remove and replace rejected Work as required by OPT; 2. Contractor fails to perform the Work in accordance with the Contract Documents; or 3. Contractor fails to comply with other provisions of the Contract Documents. B. Owner may: 1. Exclude Contractor from the Site; 2. Take possession of the Work and suspend Contractor's services related to the Work; and 3. Incorporate stored materials and equipment in the Work. C. Allow OPT access to the Site and off Site storage areas to enable Owner to exercise the rights and remedies under this Paragraph 14.07. D. All claims, costs, losses, and damages incurred or sustained by Owner in exercising the rights and remedies under this Paragraph 14.07 are to be charged against Contractor as a set-off against payments due under Article 15. These claims, costs, losses, and damages include costs of repair and the cost of replacement of work of others destroyed or damaged by correction, removal, or replacement of Contractor's Defective Work. E. Contractor is not allowed an extension of the Contract Times because of delays in the performance of the Work attributable to the exercise of the Owner's rights and remedies under this Paragraph 14.07. ARTICLE 15—PAYMENTS TO CONTRACTOR;SET-OFFS; COMPLETION; CORRECTION PERIOD 15.01 Progress Payments A. Progress payments are to be submitted to the OAR on the Application for Payment form provided by the OAR following procedures in the Contract Documents. 1. Progress payments for lump sum Work are to be paid on the basis of the earned value to date at the amounts shown in the Schedule of Values submitted as required by Paragraph 2.03. Final payment will be for the total lump sum amount. 2. Progress payments for Unit Price Work are based on the number of units completed as determined under the provisions of Paragraph 13.03. General Conditions 007200-50 Corpus Christi Standards-Regular Projects 03-23-2015 3. Progress payments for Work to be paid on the basis of the Cost of the Work per Paragraphs 13.01, 13.02 and 13.04 are to be paid for Work completed by Contractor during the pay period. B. Reduction in Payment by Owner: 1. Owner is entitled to impose a set-off against payment based on the following: a. Claims made against Owner or costs, losses, or damages incurred by Owner related to: 1) Contractor's conduct in the performance of the Work, including, but not limited to, workplace injuries, non-compliance with Laws and Regulations, or patent infringement; or 2) Contractor's failure to take reasonable and customary measures to avoid damage, delay, disruption, and interference with other work at or adjacent to the Site, including but not limited to, workplace injuries, property damage, and non-compliance with Laws and Regulations. b. Owner has been required to remove or remediate a Hazardous Environmental Condition for which Contractor is responsible; C. Work is Defective, or completed Work has been damaged by Contractor's Team, requiring correction or replacement; d. Owner has been required to correct Defective Work or complete Work in accordance with Paragraph 14.07; e. The Contract Price has been reduced by Change Orders; f. Events have occurred that would constitute a default by Contractor justifying a termination for cause; g. Liquidated damages have accrued as a result of Contractor's failure to achieve Milestones, Substantial Completion, or completion of the Work; h. Liens have been filed in connection with the Work, except where Contractor has delivered a specific Bond satisfactory to Owner to secure the satisfaction and discharge of these Liens; i. Owner has been notified of failure to make payments to Subcontractors, Suppliers, or Employees; j. Failure to submit up-to-date record documents as required by the Contract Documents; k. Failure to submit monthly Progress Schedule updates or revised schedules as requested by the OAR; I. Failure to provide Project photographs required by the Contract Documents; m. Failure to provide Certified Payroll required by the Contract Documents; n. Compensation for OPT for overtime charges of OAR or RPR, third review of documents, review of substitutions, re-inspection fees, inspections or designs related to correction of Defective Work, or other services identified as requiring payment by the Contractor; General Conditions 007200-51 Corpus Christi Standards-Regular Projects 03-23-2015 o. Costs for tests performed by the Owner to verify that Work previously tested and found to be Defective has been corrected; p. OPT has actual knowledge of the occurrence of events that would constitute a default by Contractor and therefore justify termination for cause under the Contract Documents with associated cost impacts; q. Other items entitling Owner to a set-off against the amount recommended; or r. Payment would result in an over-payment of the Contract Price. 2. Compensation for services of OPT staff is to be at the rates established by negotiations between OPT and Contractor. 3. OAR is to notify Contractor stating the amount and the reasons for an imposed set-off. The Owner is to pay the Contractor amounts remaining after deduction of the set-off. Owner is to pay the set-off amount agreed to by Owner and Contractor if Contractor remedies the reasons for the set-off. Contractor may submit a Change Proposal contesting the set-off. C. Delayed Payments: 1. No money shall be paid by Owner upon any claim, debt, demand, or account whatsoever, to any person, firm, or corporation who is in arrears to Owner for taxes; and Owner shall be entitled to counterclaim and automatically offset against any such debt, claim, demand, or account in the amount of taxes so in arrears and no assignment or transfer of such debt, claim, demand, or account after said taxes are due, shall affect the right of Owner to offset said taxes, and associated penalties and interest if applicable, against the same. 2. No payment will be made for Work authorized by a Work Change Directive until the Work Change Directive is incorporated into a Change Order. Payment can be included in an Application for payment when the Change Order is approved. D. The Owner is to pay the amount of payment recommended by the OAR within 30 days after receipt of the Application for Payment and accompanying documentation from the OAR. 15.02 Contractor's Warranty of Title A. Contractor warrants and guarantees that title to the Work, materials, and equipment furnished under the Contract is to pass to Owner free and clear of Liens, title defects, and patent, licensing, copyright, or royalty obligations no later than 7 days after the time of payment by Owner of the Application for Payment which includes these items. 15.03 Substantial Completion A. Notify OAR when Contractor considers the entire Work substantially complete and request a Certificate of Substantial Completion. B. OPT is to inspect the Work after Contractor's notification to determine if the Work is substantially complete. OAR is to either issue the Certificate of Substantial Completion which sets the date of Substantial Completion or notify Contractor of the reasons the Project is not considered to be substantially complete. General Conditions 007200-52 Corpus Christi Standards-Regular Projects 03-23-2015 C. The OPT and Contractor are to meet to discuss Owner's use or occupancy of the Work following Substantial Completion. Items to be discussed at this meeting include: 1. Review of insurance policies with respect to the end of the Contractor's coverage, and confirm the transition to coverage of the Work under a permanent property insurance policy held by Owner; 2. Owner's assumption of responsibility for security, operation, protection of the Work, maintenance, and utilities upon Owner's use or occupancy of the Work; 3. Contractor's obligations for operations and maintenance during performance and acceptance testing; 4. Contractor's access to the Site to complete punch list items; and 5. Procedures for correction of Defective Work during the 1-year correction period. 15.04 Partial Utilization A. Owner may use or occupy substantially completed parts of the Work which are specifically identified in the Contract Documents, or which OPT and Contractor agree constitutes a separately functioning and usable part of the Work prior to Substantial Completion of the Work. Owner must be able to use that part of the Work for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. Contractor and OPT are to follow the procedures of Paragraph 15.03 for this part of the Work. B. No use or occupancy or separate operation of part of the Work may occur prior to compliance with the requirements of Article 6. 15.05 Final Inspection A. OPT is to make a final inspection upon notice from Contractor that the entire Work or portion to be accepted under Paragraph 15.04 is complete. OAR is to notify Contractor of Work determined to be incomplete or Defective. Immediately take corrective measures to complete the Work and correct Defective Work. 15.06 Final Payment A. Make Application for Final Payment after completing required corrections identified during the final inspection and delivering items and documents required by the Contract Documents. Provide the following with the final Application for Payment: 1. Consent of Surety to Final Payment acknowledging unsettled disputes; and 2. Certification of Payment of Debts and Claims or Certification of Release of Liens or furnish receipts or releases in full from Subcontractors and Suppliers. B. OAR is to either recommend payment of the final Application for Payment to Owner if OPT is satisfied that the Work has been completed and Contractor's other obligations under the Contract Documents have been fulfilled or notify the Contractor of the OPT's reasons for not recommending final payment. General Conditions 007200-53 Corpus Christi Standards-Regular Projects 03-23-2015 C. The Work is complete, subject to surviving obligations, when it is ready for final payment as established by the OAR's recommendation of payment of the final Application for Payment to Owner and the issuance of a Certificate of Final Completion. D. The Owner is to pay the amount of final payment recommended by the OAR within 30 days after receipt of the final Application for Payment and accompanying documentation from the OAR. 15.07 Waiver of Claims A. The making of final payment does not constitute a waiver by Owner of claims or rights against Contractor. Owner expressly reserves claims and rights arising from: 1. Unsettled Liens or claims for non-payment; 2. Defective Work appearing after final inspection pursuant to Paragraph 15.05; 3. Contractor's failure to comply with the Contract Documents or the terms of specified special guarantees; or 4. Contractor's continuing obligations under the Contract Documents. B. Contractor waives claims and rights against Owner by accepting final payment with the exception of those Claims made in accordance with the provisions of Article 17 and specifically noted in the Certificate of Final Completion. 15.08 Correction Period A. Promptly correct Defective Work without cost to Owner for 1 year after the date of Substantial Completion or longer periods of time prescribed by the terms of the Contract Documents. B. Promptly correct damages to the Site or adjacent areas that Contractor has arranged to use through construction easements or other agreements. Promptly correct damages to Work or the work of others. Make corrections without cost to Owner. C. Owner may have the Defective Work and damages described in Paragraphs 15.08.A and 15.08.13 corrected if Contractor does not comply with the terms of OAR's instructions, or in an emergency where delay would cause serious risk of loss or damage. D. Contractor's obligation to indemnify Owner's Indemnitees for claims arising out of or related to the correction of Defective Work are as set forth in Paragraph 7.14. E. The correction period starts to run from the date when a specific item of equipment or systems are placed in continuous beneficial use by Owner before Substantial Completion of Work if so provided in the Specifications or if accepted for beneficial use by the Owner. F. The correction period is extended for an additional period of 1 year for Defective Work corrected after the date of Substantial Completion or after the accepted date the correction period starts to run as described in Paragraph 15.08.E. This extended correction period starts to run when Defective Work has been satisfactorily corrected under this Paragraph 15.08. General Conditions 007200-54 Corpus Christi Standards-Regular Projects 03-23-2015 G. Contractor's obligations under this Paragraph 15.08 are in addition to other obligations or warranties. The provisions of this Paragraph 15.08 are not a substitute for, or a waiver of, the provisions of applicable statutes of limitation or repose. ARTICLE 16—SUSPENSION OF WORK AND TERMINATION 16.01 Owner May Suspend Work A. Owner may suspend the Work or a portion of the Work for a period of not more than 90 consecutive days, at any time and without cause, by notice to Contractor. This notice fixes the date on which Contractor is to resume Work. Contractor is entitled to adjustments in the Contract Price and Contract Times directly attributable to this suspension only if efforts are made to mitigate the cost impacts of the suspension. Meet with the Owner within 10 days of the notice of suspension to discuss specific strategies to reduce or eliminate the cost of delays. Submit a Change Proposal seeking an adjustment no later than 30 days after the date fixed for resumption of Work. 16.02 Owner May Terminate for Cause A. The occurrence of one or more of the following events constitutes a default by Contractor and justifies termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents, including failure to supply sufficient skilled workers or suitable materials or equipment; 2. Failure to adhere to the Progress Schedule; 3. Failure of the Contractor to provide a satisfactory replacement Bond or insurance in the event either is lost or canceled; 4. Failure of Contractor to maintain financial solvency to adequately complete the Project as indicated by one or more of the following: a. A petition of bankruptcy is filed by or against Contractor, b. Contractor is adjudged as bankrupt or insolvent, C. Contractor or surety makes a general assignment for the benefit of creditors, d. A receiver is appointed for the benefit of Contractor's creditors, or e. A receiver is appointed on account of Contractor's insolvency; 5. Contractor's disregard of Laws or Regulations of public bodies having jurisdiction; or 6. Contractor's repeated disregard of the authority of OPT. B. Contractor and surety must provide adequate assurance of future performance in accordance with the Contract Documents that is satisfactory to Owner if Contractor is believed to be in financial distress due to the existence of one or more of the indicators listed in Paragraph 16.02.A.4. Owner may terminate this Contract if Contractor and surety fail to provide adequate documentation satisfactory to Owner within 10 days of OAR's request for this information. General Conditions 007200-55 Corpus Christi Standards-Regular Projects 03-23-2015 C. Owner may declare Contractor to be in default, give notice to Contractor and surety that the Contract is terminated, and enforce the rights available to Owner under the Performance Bond after giving Contractor and surety 10 days' notice that one or more of the events identified in Paragraph 16.02.A has occurred. D. Owner may exclude Contractor from the Site, take possession of the Work, incorporate the materials and equipment stored and complete the Work as Owner may deem expedient if Owner has terminated the Contract for cause. E. Owner may elect not to proceed with termination of the Contract under this Paragraph 16.02 if Contractor begins to cure the cause for termination within 7 days of receipt of notice of intent to terminate. F. Contractor is not entitled to receive further payments until the Work is completed if Owner proceeds as provided in this Paragraph 16.02. The amount of the Contract Price remaining is to be paid to the Contractor if the unpaid balance exceeds the cost to complete the Work. This cost to complete the Work may include related claims, costs, losses, damages, and the fees and charges of engineers, architects, attorneys, and other professionals retained by Owner. Pay the difference to Owner if the cost to complete the Work including related claims, costs, losses, and damages exceeds the unpaid balance of the Contract Price. Claims, costs, losses, and damages incurred by Owner are to be reviewed as to their reasonableness and incorporated in a Change Order by OAR. Owner is not required to obtain the lowest price for the Work performed when exercising its rights or remedies under this paragraph. G. Termination does not affect the rights or remedies of Owner against Contractor or against surety under the Payment Bond or Performance Bond. Owner does not release Contractor from liability by paying or retaining money due Contractor. 16.03 Owner May Terminate For Convenience A. Owner may terminate the Contract without cause after giving 7 days' notice to Contractor of the effective date of termination. Contractor is to be paid for the following if Owner terminates for convenience: 1. Work completed in accordance with the Contract Documents prior to the effective date of termination; 2. Actual costs sustained prior to the effective date of termination for Work in progress, plus a fee calculated in accordance with Paragraph 11.04.D.; and 3. Reasonable expenses directly attributable to termination, including costs incurred to prepare a termination for convenience cost proposal. B. No payment is payable to Contractor for loss of anticipated overhead, profits or revenue, or other economic loss arising out of or resulting from this termination. General Conditions 007200-56 Corpus Christi Standards-Regular Projects 03-23-2015 ARTICLE 17—FINAL RESOLUTION OF DISPUTES 17.01 Methods and Procedures A. The Owner or Contractor may appeal a Claim, approved or denied in part or in full, by: 1. Electing to invoke the dispute resolution process if one is provided for in the Supplementary Conditions; 2. Agreeing with the other party to submit the dispute to a dispute resolution process; or 3. Notifying the other party of the intent to submit the dispute to a court of competent jurisdiction if no dispute resolution process is provided for in the Supplementary Conditions or mutually agreed to. ARTICLE 18—MISCELLANEOUS 18.01 Computation of Times A. Exclude the first day and include the last day when determining dates for a period of time referred to in the Contract Documents by days. The last day of this period is to be omitted from the determination if it falls on a Saturday, Sunday, or a legal holiday. B. All references and conditions for a Calendar Day Contract in the Contract Documents apply for a Fixed Date Contract. A Fixed Date Contract is one in which the calendar dates for reaching Substantial Completion and/or final completion are specified in lieu of identifying the number of days involved. 18.02 Owner's Right to Audit Contractor's Records A. By execution of the Contract, Contractor grants Owner the right to audit, examine, inspect and/or copy, at Owner's election at all reasonable times during the term of this Contract and for a period of four (4) years following the completion or termination of the Work, all of Contractor's written and electronically stored records and billings relating to the performance of the Work under the Contract Documents.The audit, examination or inspection may be performed by an Owner designee,which may include its internal auditors or an outside representative engaged by Owner. Contractor agrees to retain its records for a minimum of four(4)years following termination of the Contract, unless there is an ongoing dispute under the Contract, then, such retention period must extend until final resolution of the dispute. As used in these General Conditions, "Contractor written and electronically stored records" include any and all information, materials and data of every kind and character generated as a result of the work under this Contract. Example of Contractor written and electronically stores records include, but are not limited to: accounting data and reports, billings, books, general ledgers, cost ledgers, invoices, production sheets, documents, correspondences, meeting notes, subscriptions, agreements, purchase orders, leases, contracts, commitments, arrangements, notes, daily diaries, reports, drawings, receipts,vouchers, memoranda, time sheets, payroll records, policies, procedures, Subcontractor agreements, Supplier agreements, rental equipment proposals, federal and state tax filings for any issue in question, along with any and all other agreements, sources of information and matters that may, in Owner's sole judgment, General Conditions 007200-57 Corpus Christi Standards-Regular Projects 03-23-2015 have any bearing on or pertain to any matters, rights, duties or obligations under or covered by any Agreement Documents. B. Owner agrees to exercise the right to audit, examine or inspect Contractor's records only during regular business hours. Contractor agrees to allow Owner and/or Owner's designee access to all of the Contractor's Records, Contractor's facilities and current or former employees of Contractor, deemed necessary by Owner or its designee(s), to perform such audit, inspection or examination. Contractor also agrees to provide adequate and appropriate work space necessary for Owner or its designees to conduct such audits, inspections or examinations. C. Contractor must include this Section in any Subcontractor, supplier or vendor contract. 18.03 Independent Contractor A. Contractor is to perform its duties under this Contract as an independent contractor. The Contractor's Team and their personnel are not considered to be employees or agents of the Owner. Nothing in this Contract is to be interpreted as granting Contractor's Team the right or authority to make commitments for the Owner. This Contract does not constitute or create a joint venture, partnership, or formal business organization of any kind. 18.04 Cumulative Remedies A. The duties and obligations imposed by these General Conditions and the rights and remedies available to the Owner or Contractor by these General Conditions are in addition to, and are not a limitation of, the rights and remedies which are otherwise imposed or available by: 1. Laws or Regulations; 2. Special warranties or guarantees; or 3. Other provisions of the Contract Documents. B. The provisions of this Paragraph 18.03 are as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right, and remedy to which they apply. 18.05 Limitation of Damages A. Owner's Indemnitees are not liable to Contractor for claims, costs, losses, or damages sustained by Contractor's Team associated with other projects or anticipated projects. 18.06 No Waiver A. The failure of Owner or Contractor to enforce any provision of this Contract does not constitute a waiver of that provision, affect the enforceability of that provision, or the enforceability of the remainder of this Contract. 18.07 Severability A. If a court of competent jurisdiction renders a part of this Contract invalid or unenforceable, that part is to be severed and the remainder of this Contract continues in full force. General Conditions 007200-58 Corpus Christi Standards-Regular Projects 03-23-2015 18.08 Survival of Obligations A. Representations, indemnifications,warranties, guarantees, and continuing obligations required by the Contract Documents survive completion and acceptance of the Work or termination of the Contract. 18.09 No Third Party Beneficiaries A. Nothing in this Contract can be construed to create rights in any entity other than the Owner and Contractor. Neither the Owner nor Contractor intends to create third party beneficiaries by entering into this Contract. 18.10 Assignment of Contract A. This Contract may not be assigned in whole or in part by the Contractor without the consent of the Owner. 18.11 No Waiver of Sovereign Immunity A. The Owner has not waived its sovereign immunity by entering into and performing its obligations under this Contract. 18.12 Controlling Law A. This Contract is governed by the laws of the State of Texas without regard to its conflicts of laws. Venue for legal proceedings lies exclusively in Nueces County,Texas. 18.13 Conditions Precedent to Right to Sue A. Notwithstanding anything herein to the contrary, Contractor will have at least 90 days to give notice of a claim for damages as a condition precedent to the right to sue on the Contract, subject to the contractual Claims and Alternative Dispute Resolution processes set forth herein. 18.14 Waiver of Trial by Jury A. Owner and Contractor agree that they have knowingly waived and do hereby waive the right to trial by jury and have instead agreed, in the event of any litigation arising out of or connected to this Contract, to proceed with a trial before the court, unless both parties subsequently agree otherwise in writing. 18.15 Attorney Fees A. The Parties expressly agree that, in the event of litigation, all parties waive rights to payment of attorneys'fees that otherwise might be recoverable, pursuant to the Texas Civil Practice and Remedies Code Chapter 38,Texas Local Government Code §271.153, the Prompt Payment Act, common law or any other provision for payment of attorney's fees. 18.16 Compliance with Laws A. Comply with the Americans with Disabilities Act of 1990 as amended (ADA) and Texas Architectural Barriers Act and all regulations relating to either statute. General Conditions 007200-59 Corpus Christi Standards-Regular Projects 03-23-2015 B. Comply with all applicable federal, state, and city laws, rules and regulations. 18.17 Enforcement A. The City Manager or designee and the City Attorney or designee, are fully authorized and will have the right to enforce all legal rights and obligations under the Contract without further authorization from City Council. 18.18 Subject to Appropriation A. Funds are appropriated by the Owner on a yearly basis. If for any reason funds are not appropriated in any given year, the Owner may direct immediate suspension or termination of the Contract, with no additional liability to the Owner. If the Contractor is terminated or suspended and the Owner requests remobilization at a later date, the Contractor may request payment for reasonable demobilization/remobilization costs. Such costs shall be addressed through a Change Order to the Contract. Under no circumstances may a provision or obligation under this Contract be interpreted as contrary to this paragraph. 18.19 Contract Sum A. The Contract Sum is stated in the Contract and, including authorized adjustments, is the total maximum not-to-exceed amount payable by Owner to Contractor for performance of the Work under the Contract Documents. Contractor accepts and agrees that all payments pursuant to this Contract are subject to the availability and appropriation of funds by the Corpus Christi City Council. If funds are not available and/or appropriated,this Contract shall immediately be terminated with no liability to any party to this Contract. 18.20 Contractor's Guarantee as Additional Remedy A. The Contractor's guarantee is a separate and additional remedy available to benefit the Owner. Neither the guarantee nor the expiration of the guarantee period will operate to reduce, release, or relinquish any rights or remedies available to the Owner for any claims or causes of action against the Contractor or any other individual or entity. END OF SECTION General Conditions 007200-60 Corpus Christi Standards-Regular Projects 03-23-2015 00 72 01 INSURANCE REQUIREMENTS ARTICLE 1—INSURANCE REQUIREMENTS 1.01 CONTRACTOR'S INSURANCE AMOUNTS A. Provide the insurance coverage for at least the following amounts unless greater amounts are required by Laws and Regulations: Type of Insurance Minimum Insurance Coverage Commercial General Liability including 1. Commercial Form 2. Premises—Completed Operations 3. Explosions and Collapse Hazard 4. Underground Hazard 5. Products/Completed Operations $1,000,000 Per Occurrence Hazard $2,000,000 Aggregate 6. Contractual Liability 7. Broad Form Property Damage 8. Independent Contractors 9. Personal &Advertising Injury Business Automobile Liability-Owned, $1,000,000 Combined Single Limit Non-Owned, Rented and Leased Workers' Compensation Statutory Employer's Liability $500,000/500,000/500,000 Excess Liability/Umbrella Liability $1,000,000 Per Occurrence Required if Contract Price>$5,000,000 Contractor's Pollution Liability/ $1,000,000 Per Claim Environmental Impairment Coverage Not limited to sudden and accidental Required ❑ Not Required discharge. To include long-term environmental impact for the disposal of pollutants/contaminants. Required if excavation>3 ft. Builder's Risk(All Perils including Collapse) Equal to Full Replacement Cost of Structure and Contents Required for vertical structures and bridges ❑ Required X Not Required Installation Floater Equal to Contract Price Required if installing city-owned equipment ❑ Required Not Required Insurance Requirements 00 72 01- 1 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 1.02 GENERAL PROVISIONS A. Provide insurance coverages and limits meeting the requirements for insurance in accordance with Article 6 of the General Conditions and this Section. B. Provide endorsements to the policies as outlined in this Section. C. Obtain insurance from companies that are duly licensed or authorized in the State of Texas to issue insurance policies for the required limits and coverages. Provide insurance from companies that have an A.M. Best rating of A-VIII or better. D. Furnish copies of endorsements and documentation of applicable self-insured retentions and deductibles upon request by OPT or any named insured or additional insured. Contractor may block out (redact) any confidential premium or pricing information contained in any endorsement furnished under this Contract. E. The name and number of the Project must be referenced on the certificate of insurance. F. OPT's failure to demand such certificates or other evidence of the Contractor's full compliance with the insurance requirements or failure to identify a deficiency in compliance from the evidence provided is not a waiver of the Contractor's obligation to obtain and maintain the insurance required by the Contract Documents. G. Notify the Owner if the Contractor fails to purchase or maintain the insurance required by the Contract Documents. Contractor shall not be allowed to perform any Work on the Project until the required insurance policies are in effect. A Certificate of Liability Insurance shall be submitted to the OPT. H. Owner may exclude the Contractor from the Site and exercise Owner's termination rights under Article 16 of the General Conditions if Contractor fails to obtain or maintain the required insurance. I. Owner does not represent that the insurance coverage and limits established in this Contract are adequate to protect Contractor or Contractor's interests. J. The required insurance and insurance limits do not limit the Contractor's liability under the indemnities granted to Owner's Indemnitees in the Contract Documents. K. Provide for an endorsement that the "other insurance" clause shall not apply to the OPT where the OPT is an additional insured shown on the policy. Contractor's insurance is primary and non-contributory with respect to any insurance or self-insurance carried by the OPT for liability arising out of operations under this Contract. L. Include the Owner and list the other members of the OPT and any other individuals or entities identified in the Supplementary Conditions as additional insureds on all policies with the exception of the workers' compensation policy and Contractor's professional liability policy. 1.03 CONTRACTOR'S INSURANCE A. Purchase and maintain workers' compensation and employer's liability insurance for: 1. Claims under workers' compensation, disability benefits, and other similar employee benefit acts. Obtain workers' compensation coverage through a licensed insurance company in accordance with Texas law and written on a policy and endorsements approved by the Texas Department of Insurance. Provide insurance in amounts to Insurance Requirements 00 72 01-2 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 meet all workers' compensation obligations. Provide an "All Other States" endorsement if Contractor is not domiciled in Texas and policy is not written in accordance with Texas Department of Insurance rules. 2. Claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. United States Longshoreman and Harbor Workers' Compensation Act and Jones Act coverage (if applicable). 4. Foreign voluntary worker compensation (if applicable). B. Purchase and maintain commercial general liability insurance covering all operations by or on behalf of Contractor. The expected coverage is that which would be included in a commercially available ISO Commercial General Liability policy and should provide coverage on an occurrence basis, against: 1. Claims for damages because of bodily injury, sickness or disease, or death of any person other than Contractor's employees; 2. Claims for damages insured by reasonably available personal injury liability coverage which are sustained; 3. By any person as a result of an offense directly or indirectly related to the employment of such person by Contractor; and 4. Claims for damages, other than to the Work itself, because of injury to or destruction of tangible property wherever located, including any resulting loss of use. C. Provide Contractor's commercial general liability policy that is written on a 1996 (or later) ISO commercial general liability form (occurrence form) and include the following coverages and endorsements: 1. Products and completed operations coverage as required in this Section. Insurance is to remain in effective for 3 years after final payment. Furnish evidence of the continuation of this insurance at final payment and again each year for 3 years after final payment to Owner and each named insured or additional insured. a. If required by Paragraph 1.01, provide and maintain Installation Floater insurance for property under the care, custody, or control of Contractor. Provide Installation Floater insurance that is a broad form or"All Peril" policy providing coverage for all materials, supplies, machinery, fixtures, and equipment which will be incorporated into the Work. 1) Provide coverage under the Contractor's Installation Floater that includes: a) Faulty or Defective workmanship, materials, maintenance, or construction; b) Cost to remove Defective or damaged Work from the Site or to protect it from loss or damage; c) Cost to cleanup and remove pollutants; d) Coverage for testing and startup; e) Any loss to property while in transit; Insurance Requirements 00 72 01-3 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 f) Any loss at the Site; g) Any loss while in storage, both on and off the Site; and h) Any loss to temporary Project Works if their value is included in the Contract Price. 2) Coverage cannot be contingent on an external cause or risk or limited to property for which the Contractor is legally liable. Provide limits of insurance adequate to cover the value of the installation. Pay any deductible carried under this coverage and assume responsibility for claims on materials, supplies, machinery, fixture, and equipment which will be incorporated into the Work while in transit or in storage. 2. Blanket contractual liability coverage for Contractor's contractual indemnity obligations in Paragraph 7.14 of the General Conditions, and all other contractual indemnity obligations of Contractor in the Contract Documents. Industry standard ISO Contractual Liability coverage will meet this obligation. 3. Broad form property damage coverage. 4. Severability of interest. 5. Underground explosion and collapse coverage. 6. Personal injury coverage. 7. Endorsement CG 2032, "Additional Insured - Engineers, Architects or Surveyors Not Engaged by the Named Insured" or its equivalent. D. Purchase and maintain automobile liability insurance against claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, maintenance or use of any motor vehicle. E. For Projects with a Contract Value that exceeds$5,000,000, purchase and maintain umbrella or excess liability insurance written over the underlying employer's liability, commercial general liability, and automobile liability insurance described in the paragraphs above. Provide coverage that is at least as broad as all underlying policies. Provide a policy that provides first-dollar liability coverage as needed. F. Provide Contractor's commercial general liability and automobile liability policies that: 1. Are written on an occurrence basis; 2. Include the individuals or entities identified in the Supplementary Conditions as additional insureds; 3. Include coverage for Owners Indemnitees as defined in Article 1 of the General Conditions; and 4. Provide primary coverage for all claims covered by the policies, including those arising from both ongoing and completed operations. G. Purchase and maintain insurance coverage for third-party injury and property damage claims, including clean-up costs that result from Hazardous Environmental Conditions which result from Contractor's operations and completed operations. Provide Contractor's pollution liability insurance that includes long-term environmental impacts for the disposal of pollutants/contaminants and is not limited to sudden and accidental discharge. The Insurance Requirements 00 72 01-4 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 completed operations coverage is to remain in effect for 3 years after final payment. The policy must name OPT and any other individuals and entities identified in the Supplementary Conditions as additional insureds. H. Purchase and maintain applicable professional liability insurance, or have Subcontractors and Suppliers do so, if Contractor or any Subcontractor or Supplier will provide or furnish professional services under this Contract. I. The policies of insurance required by this Section must: 1. Include at least the specific coverages and be written for not less than the limits of liability provided in this Section or required by Laws or Regulations, whichever is greater. 2. Contain a provision that coverage afforded will not be canceled or materially changed until at least 30 days prior written notice has been given to Contractor, Owner, and all named insureds and additional insureds. 3. Remain in effect at all times when Contractor is performing Work or is at the Site to conduct tasks arising from the Contract Documents. 4. Be appropriate for the Work being performed and provide protection from claims resulting from the Contractor's performance of the Work and Contractor's other obligations under the Contract Documents,whether performed by Contractor, Subcontractor, Supplier, anyone directly or indirectly employed or retained by any of them, or by anyone for whose acts they may be liable. J. The coverage requirements for specific policies of insurance must be met directly by those policies and may not rely on excess or umbrella insurance provided in other policies to meet the coverage requirement. 1.04 PROPERTY INSURANCE A. Purchase and maintain builder's risk insurance in the amount of the full replacement cost of the Project. This policy is subject to the deductible amounts requirements in this Section or those required by Laws and Regulations and must comply with the requirements of Paragraph 1.06. This insurance shall: 1. Include the OPT, Contractor, and all Subcontractors, and any other individuals or entities identified in the Supplementary Conditions, as named insureds. 2. Be written on a builder's risk"all risk" policy form that includes insurance for physical loss or damage to the Work, temporary buildings, falsework, and materials and equipment in transit, and insures against at least the following perils or causes of loss: fire; lightning;windstorm; riot; civil commotion; terrorism; vehicle impact; aircraft; smoke; theft; vandalism and malicious mischief; mechanical breakdown, boiler explosion, and artificially generated electric current; earthquake;volcanic activity, and other earth movement; flood; collapse; explosion; debris removal; demolition occasioned by enforcement of Laws and Regulations; water damage (other than that caused by flood); and such other perils or causes of loss as may be specifically required by this Section. If insurance against mechanical breakdown, boiler explosion, and artificially generated electric current; earthquake; volcanic activity, and other earth movement; or flood, are not commercially available under builder's risk, by Insurance Requirements 00 72 01-5 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 endorsement or otherwise, this insurance may be provided through other insurance policies acceptable to Owner and Contractor. 3. Cover expenses incurred in the repair or replacement of any insured property. 4. Cover materials and equipment in transit or stored prior to being incorporated in the Work. 5. Cover Owner-furnished or assigned property. 6. Allow for partial utilization of the Work by Owner. 7. Allow for the waiver of the insurer's subrogation rights as set forth below. 8. Provide primary coverage for all losses and damages caused by the perils or causes of loss covered. 9. Not include a co-insurance clause. 10. Include a broad exception for ensuing losses from physical damage or loss with respect to any Defective workmanship, design, or materials exclusions. 11. Include testing and startup. 12. Be maintained in effect until the Work as a whole is complete, unless otherwise agreed to in writing by Owner and Contractor. B. Evidence of insurance provided must contain a provision or endorsement that the coverage afforded will not be canceled or materially changed or renewal refused until at least 30 days prior written notice has been given to Owner and Contractor and to each named insured. C. Pay for costs not covered by the policy deductible. D. Notify builder's risk insurance provider if Owner will occupy or use a portion or portions of the Work prior to Substantial Completion of all the Work as provided in Paragraph 15.04 of the General Conditions. Maintain the builder's risk insurance in effect during this Partial Occupancy or Use. E. Contractor may purchase other special insurance to be included in or to supplement the builder's risk or property insurance policies provided under this Section. F. Contractor, Subcontractors, or employees of the Contractor or a Subcontractor owning property items, such as tools, construction equipment, or other personal property not expressly covered in the insurance required by the Contract Documents are responsible for providing their own insurance. 1.05 WAIVER OF RIGHTS A. Insurance shall include a waiver of subrogation in favor of the additional insureds identified in SECTION 00 73 00 SUPPLEMENTARY CONDITIONS. B. All policies purchased in accordance with this Section are to contain provisions to the effect that the insurers have no rights of recovery against OPT, named insureds or additional insureds in the event of a payment for loss or damage. Contractor and insurers waive all rights against the Owner's Indemnities for losses and damages created by or resulting from any of the perils or causes of loss covered by these policies and any other applicable Insurance Requirements 00 72 01-6 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 property insurance. None of these waivers extend to the rights Contractor has to the proceeds of insurance as trustee. C. Contractor is responsible for assuring that agreements with Subcontractors contains provisions that the Subcontractor waive all rights against Owner's Indemnitees, Contractor, named insureds and additional insureds, and the officers, directors, members, partners, employees, agents, consultants, and subcontractors of each and any of them, for all losses and damages created by or resulting from any of the perils or causes of loss covered by builder's risk insurance and other property insurance. 1.06 OWNER'S INSURANCE FOR THE PROJECT A. Owner is not responsible for purchasing and maintaining any insurance to protect the interest of the Contractor, Subcontractors, or others in the Work. The stated limits of insurance required are minimum only. Determine the limits that are adequate. These limits may be basic policy limits or any combination of basic limits and umbrella limits. In any event, Contractor is fully responsible for all losses arising out of, resulting from, or connected with operations under this Contract whether or not these losses are covered by insurance. The acceptance of evidence of insurance by the OPT, named insureds, or additional insureds does not release the Contractor from compliance with the insurance requirements of the Contract Documents. ARTICLE 2—EVIDENCE OF INSURANCE 2.01 ACCEPTABLE EVIDENCE OF INSURANCE A. Provide evidence of insurance acceptable to the Owner with the executed Contract Documents. Provide the following as evidence of insurance: 1. Certificates of Insurance on an acceptable form; 2. Riders or endorsements to policies; and 3. Policy limits and deductibles. B. Provide a list of"Additional Insureds" for each policy. C. Provide evidence that waivers of subrogation are provided on all applicable policies. D. Provide evidence of requirements for 30 days' notice before cancellation or any material change in the policy's terms and conditions, limits of coverage, or change in deductible amount. 2.02 CERTIFICATES OF INSURANCE A. Submit Certificates of Insurance meeting the following requirements: 1. Form has been filed with and approved by the Texas Department of Insurance under Texas Insurance Code §1811.101; or 2. Form is a standard form deemed approved by the Department under Texas Insurance Code §1811.101. Insurance Requirements 00 72 01-7 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 3. No requirements of this Contract may be interpreted as requiring the issuance of a certificate of insurance on a certificate of insurance form that has not first been filed with and approved by the Texas Department of Insurance. B. Include the name of the Project in the description of operations box on the certificate of insurance. 2.03 INSURANCE POLICIES A. If requested by the Owner, provide a copy of insurance policies, declaration pages and endorsements, and documentation of applicable self-insured retentions and deductibles. B. Contractor may block out (redact) any proprietary information or confidential premium pricing information contained in any policy or endorsement furnished under this Contract. 2.04 CONTINUING EVIDENCE OF COVERAGE A. Provide updated, revised, or new evidence of insurance in accordance this Section prior to the expiration of existing policies. B. Provide evidence of continuation of insurance coverage at final payment and for the following 3 years. 2.05 NOTICES REGARDING INSURANCE A. Notices regarding insurance are to be sent to the Owner at the following address: City of Corpus Christi— Engineering Attn: Construction Contract Admin. P.O. Box 9277 Corpus Christi,TX 78469-9277 B. Submit questions regarding insurance requirements to the Construction Contract Administrator by calling 361-826-3530. ARTICLE 3—TEXAS WORKERS'COMPENSATION INSURANCE REQUIRED NOTICE 3.01 WORKERS' COMPENSATION INSURANCE COVERAGE A. Definitions: 1. Certificate of coverage ("certificate") -A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC- 81,TWCC-82,TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the Project. 2. Duration of the Project-includes the time from the beginning of the Work on the Project until the Contractor's/person's Work on the Project has been completed and accepted by the governmental entity. 3. Persons providing services on the Project ("Subcontractor" in §406.096) -includes all persons or entities performing all or part of the services the Contractor has undertaken to perform on the Project, regardless of whether that person contracted Insurance Requirements 00 72 01-8 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 directly with the Contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the Project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the Project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the Contractor providing services on the Project, for the duration of the Project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the Contract. D. If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the Project, the Contractor must, prior to the end of the coverage period, file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project, and provide to the governmental entity: 1. A certificate of coverage, prior to that person beginning Work on the Project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the Project; and 2. No later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. F. The Contractor shall retain all required certificates of coverage for the duration of the Project and for one year thereafter. G. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery,within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the Project. H. The Contractor shall post on each Project Site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the Project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. I. The Contractor shall contractually require each person with whom it contracts to provide services on a project,to: 1. Provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44)for all of its employees providing services on the Project, for the duration of the Project; Insurance Requirements 00 72 01-9 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 2. Provide to the Contractor, prior to that person beginning Work on the Project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the Project, for the duration of the Project; 3. Provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; 4. Obtain from each other person with whom it contracts, and provide to the Contractor: a. A certificate of coverage, prior to the other person beginning Work on the Project; and b. A new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; 5. Retain all required certificates of coverage on file for the duration of the Project and for one year thereafter; 6. Notify the governmental entity in writing by certified mail or personal delivery,within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the Project; and 7. Contractually require each person with whom it contracts, to perform as required by paragraphs (1) -(7), with the certificates of coverage to be provided to the person for whom they are providing services. J. By signing this Contract or providing or causing to be provided a certificate of coverage, the Contractor is representing to the governmental entity that all employees of the Contractor who will provide services on the Project will be covered by workers' compensation coverage for the duration of the Project, that the coverage will be based on proper reporting of classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. K. The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the governmental entity to declare the Contract void if the Contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. END OF SECTION Insurance Requirements 00 72 01- 10 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 00 72 02 WAGE RATE REQUIREMENTS ARTICLE 1—PREVAILING WAGE RATE REQUIREMENTS 1.01 PAYMENT OF PREVAILING WAGE RATES A. Contractor and any Subcontractors employed on this Project shall pay not less than the rates established by the Owner as required by Texas Government Code Chapter 2258. B. Contractor is required to pay Davis-Bacon Wage Rates. 1.02 RECORDS A. In accordance with Tex. Gov't Code §2258.024, the Contractor and its Subcontractors, if any, shall keep a record showing: 1. The name and occupation of each worker employed by the Contractor or Subcontractor in the construction of the Work; and 2. The actual per diem wages paid to each worker. B. The record shall be open at all reasonable hours to inspection by the officers and agents of the Owner. 1.03 LIABILITY; PENALTY; CRIMINAL OFFENSE A. Tex. Gov't Code §2258.003— Liability: An officer, agent, or employee of the Owner is not liable in a civil action for any act or omission implementing or enforcing Chapter 2258 unless the action was made in bad faith. B. Tex. Gov't Code §2258.053(b)— Penalty: Any Contractor or Subcontractor who violates the requirements of Chapter 2258, shall pay to the Owner, on whose behalf the Contract is made, $60 for each worker employed or each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the Contract. C. Tex. Gov't Code §2258.058—Criminal Offense: 1. An officer, agent, or representative of the Owner commits an offense if the person willfully violates or does not comply with a provision of Chapter 2258. 2. Any Contractor or Subcontractor, or an agent or representative of the Contractor or Subcontractor, commits an offense if the person violates Tex. Gov't Code §2258.024. 3. An offense is punishable by: a. A fine not to exceed $500; b. Confinement in jail for a term not to exceed 6 months; or C. Both a fine and confinement. Wage Rate Requirements 007202- 1 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 REV 06-12-2015 1.04 PREVAILING WAGE RATES A. The minimum rates for various labor classifications as established by the Owner are shown below: Wage Determination Construction Type Project Type (WD) No TX-31 Heavy Heavy Construction Projects (including Sewer and Water Line Construction and Drainage Projects) TX-40 Highway Highway Construction Projects (excluding tunnels, building structures in rest area projects &railroad construction; bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction; and other major bridges). END OF SECTION Wage Rate Requirements 007202-2 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 REV 06-12-2015 General Decision Number: TX170031 01/06/2017 TX31 Superseded General Decision Number: TX20160031 State: Texas Construction Type: Heavy Counties: Nueces and San Patricio Counties in Texas. HEAVY CONSTRUCTION PROJECTS (including Sewer and Water Line Construction and Drainage Projects) Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/06/2017 * SUTX1987-001 12/01/1987 Rates Fringes CARPENTER (Excluding Form Setting) . . . . . . . . . . . . . . . . . . . . . . . . .$ 9.05 Concrete Finisher. . . . . . . . . . . . . . . .$ 7.56 ELECTRICIAN. . . . . . . . . . . . . . . . . . . . . .$ 13.37 2.58 Laborers: Common. . . . . . . . . . . . . . . . . . . . . .$ 7.25 Utility. . . . . . . . . . . . . . . . . . . . .$ 7.68 Power equipment operators: Backhoe. . . . . . . . . . . . . . . . . . . . .$ 9.21 Motor Grader. . . . . . . . . . . . . . . .$ 8.72 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ---------------------------------------------------------------- Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii) ) . https://www.wdol.gov/wdol/scafiles/davisbacon/TX31.dvb?v=0[1/10/2017 12:01:32 PM] ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local) , a survey rate (weighted average rate) or a union average rate (weighted union average rate) . Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 1000 of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on https://www.wdol.gov/wdol/scafiles/davisbacon/TX31.dvb?v=0[1/10/2017 12:01:32 PM] a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2. ) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7) . Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board) . Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ---------------------------------------------------------------- END OF GENERAL DECISION https://www.wdol.gov/wdol/scafiles/davisbacon/TX31.dvb?v=0[1/10/2017 12:01:32 PM] General Decision Number: TX170040 01/06/2017 TX40 Superseded General Decision Number: TX20160040 State: Texas Construction Type: Highway Counties: Aransas, Calhoun, Goliad, Nueces and San Patricio Counties in Texas. HIGHWAY CONSTRUCTION PROJECTS (excluding tunnels, building structures in rest area projects & railroad construction; bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction; and other major bridges) . Note: Under Executive Order (EO) 13658, an hourly minimum wage of $10.20 for calendar year 2017 applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2015. If this contract is covered by the EO, the contractor must pay all workers in any classification listed on this wage determination at least $10.20 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in calendar year 2017. The EO minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Modification Number Publication Date 0 01/06/2017 * SUTX2011-010 08/08/2011 Rates Fringes CEMENT MASON/CONCRETE FINISHER (Paving & Structures) . . .$ 12.64 FORM BUILDER/FORM SETTER Paving & Curb. . . . . . . . . . . . . . .$ 10.69 Structures. . . . . . . . . . . . . . . . . .$ 13.61 LABORER Asphalt Raker. . . . . . . . . . . . . . .$ 11.67 Flagger. . . . . . . . . . . . . . . . . . . . .$ 8.81 Laborer, Common. . . . . . . . . . . . .$ 10.25 Laborer, Utility. . . . . . . . . . . .$ 11.23 Pipelayer. . . . . . . . . . . . . . . . . . .$ 11.17 Work Zone Barricade Servicer. . . . . . . . . . . . . . . . . . . .$ 11.51 PAINTER (Structures) . . . . . . . . . . . . .$ 21.29 POWER EQUIPMENT OPERATOR: Asphalt Distributor. . . . . . . . .$ 14.25 Asphalt Paving Machine. . . . . .$ 13.44 Mechanic. . . . . . . . . . . . . . . . . . . .$ 17.00 Motor Grader, Fine Grade. . . .$ 17.74 Motor Grader, Rough. . . . . . . . .$ 16.85 TRUCK DRIVER Lowboy-Float. . . . . . . . . . . . . . . .$ 16.62 Single Axle. . . . . . . . . . . . . . . . .$ 11.61 ---------------------------------------------------------------- WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental. ---------------------------------------------------------------- Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide https://www.wdol.gov/wdol/scafiles/davisbacon/TX40.dvb?v=0[1/10/2017 12:02:44 PM] employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at www.dol.gov/whd/govcontracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (ii) ) . ---------------------------------------------------------------- The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of "identifiers" that indicate whether the particular rate is a union rate (current union negotiated rate for local) , a survey rate (weighted average rate) or a union average rate (weighted union average rate) . Union Rate Identifiers A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than "SU" or "UAVG" denotes that the union classification and rate were prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014. Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate. Survey Rate Identifiers Classifications listed under the "SU" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier. Survey wage rates are not updated and remain in effect until a new survey is conducted. Union Average Rate Identifiers Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 1000 of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date https://www.wdol.gov/wdol/scafiles/davisbacon/TX40.dvb?v=0[1/10/2017 12:02:44 PM] for the classifications and rates under that identifier. A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) Has there been an initial decision in the matter? This can be: * an existing published wage determination * a survey underlying a wage determination * a Wage and Hour Division letter setting forth a position on a wage determination matter * a conformance (additional classification and rate) ruling On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour Regional Office for the area in which the survey was conducted because those Regional Offices have responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2. ) and 3.) should be followed. With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7) . Write to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue. 3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board) . Write to: Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 4.) All decisions by the Administrative Review Board are final. ---------------------------------------------------------------- END OF GENERAL DECISION https://www.wdol.gov/wdol/scafiles/davisbacon/TX40.dvb?v=0[1/10/2017 12:02:44 PM] 00 72 03 MINORITY/MBE/ DBE PARTICIPATION POLICY ARTICLE 1—PARTICIPATION POLICY 1.01 POLICY A. It is the policy of the City of Corpus Christi that maximum opportunity is afforded minorities,women, and Minority Business Enterprises (MBE)to participate in the performance of contracts awarded by the City of Corpus Christi in support of Equal Employment Opportunity goals and objectives of the Affirmative Action Policy Statement of the City dated October 1989, and any amendments thereto. In accordance with such policy,the City has established goals, as stated herein, both for minority and female participation by trade and for Minority Business Enterprise. 1.02 DEFINITIONS A. Prime Contractor: Any person, firm, partnership, corporation, association, or joint venture as herein provided which has been awarded a City contract. B. Subcontractor: Any named person, firm, partnership, corporation, association, or joint venture as herein identified as providing work, labor, services, supplies, equipment, materials, or any combination of the foregoing under contract with a prime contractor on a City contract. C. Minority Business Enterprise: A business enterprise that is owned and controlled by one or more minority person(s). Minority person(s) must collectively own, operate and/or actively manage, and share in payments from such an enterprise in the manner hereinafter set forth: 1. Owned: a. For a sole proprietorship to be deemed a minority business enterprise, it must be owned by a minority person. b. For an enterprise doing business as a partnership, at least 51 percent of the assets or interest in the partnership property must be owned by one or more minority person(s). C. For an enterprise doing business as a corporation, at least 51 percent of the assets or interest in the corporate shares must be owned by one or more minority person(s). 2. Controlled: a. The primary power, direct or indirect, to manage a business enterprise rests with a minority person(s). 3. Share in Payments: a. Minority partners, proprietors, or stockholders of the business enterprise, must be entitled to receive 51 percent or more of the total profits, bonuses, dividends, interest payments, commissions, consulting fees, rents, procurement, and subcontract payments, and any other monetary distribution paid by the business enterprise. Minority/MBE/DBE Participation Policy 007203- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 D. Minority: Minority persons include Blacks, Mexican-Americans and other persons of Hispanic origin, American Indians, Alaskan Natives, and Asians or Pacific Islanders. For the purposes of this policy,women are also considered as minorities. E. Female Owned Business Enterprise: A sole proprietorship that is owned and controlled by a woman, a partnership at least 51 percent of whose assets or partnership interests are owned by one or more women, or a corporation at least 51 percent of whose assets or interests in the corporate shares are owned by one or more women. F. Joint Venture: A joint venture means an association of two or more persons, partnerships, corporations, or any combination thereof, founded to carry on a single business activity which is limited in scope and direction. The degree to which a joint venture may satisfy the stated MBE goal cannot exceed the proportionate interest of the MBE as a member of the joint venture in the Work to be performed by the joint venture. For example, a joint venture which is to perform 50 percent of the Work itself and in which a minority joint venture partner has a 50 percent interest, shall be deemed equivalent to having minority participation in 25 percent of the Work. Minority members of the joint venture must have financial, managerial, or technical skills in the Work to be performed by the joint venture. 1.03 GOALS A. The goals for participation by minorities and Minority Business Enterprises expressed in percentage terms for the Contractor's aggregate work force on all construction Work for the Contract award shall be as specified in SECTION 00 2113 INVITATION TO BID AND INSTRUCTIONS TO BIDDERS. B. These goals are applicable to all the construction work (regardless of federal participation) performed in the Contract, including approved Change Orders. The hours of minority employment must be substantially uniform throughout the length of the Contract and in each trade. The transfer of minority employees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's percentage is prohibited. 1.04 COMPLIANCE A. Upon completion of the Project, a final breakdown of MBE participation, substantiated by copies of paid invoices, shall be submitted by the Contractor to the City Engineer. B. Make bi-weekly payroll submittals to the City Engineer. The Contractor is to indicate the percent of minority and female participation, by trade, which has been utilized on the Project. Along with the request for final payment on the Project,the Contractor will indicate, in writing, the overall participation in these areas which have been achieved. The City Engineer may withhold monthly or final payments to the Contractor for failure to submit bi-weekly payrolls in a timely fashion or to submit overall participation information as required. END OF SECTION Minority/MBE/DBE Participation Policy 007203-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 00 73 00 SUPPLEMENTARY CONDITIONS These Supplementary Conditions amend or supplement SECTION 00 72 00 GENERAL CONDITIONS and other provisions of the Contract Documents. All provisions not amended or supplemented in these Supplementary Conditions remain in effect. The terms used in these Supplementary Conditions have the meanings stated in the General Conditions. Additional terms used in these Supplementary Conditions have the meanings stated below. ARTICLE 1—DEFINITIONS AND TERMINOLOGY SC-1.01 DEFINED TERMS A. The members of the OPT as defined in Paragraph 1.01.A.41 consists of the following organizations: City of Corpus Christi,Texas Urban Engineering Rock Engineering&Testing Laboratory B. Paragraph 1.01.A.54"Substantial Completion" is more specifically defined for this Project as: 1. The following items are fully functional and suitable for operation in accordance with the Contract Documents: a. All street improvements are open to traffic. b. Pedestrian and Driveway facilities are open. C. All utilities are operational. 2. Only the following items not yet complete in accordance with the Contract Documents: a. Final site cleanup. b. Sod. ARTICLE 4—COMMENCEMENT AND PROGRESS OF THE WORK SC-4.04 DELAYS IN CONTRACTOR'S PROGRESS A. The allocation for delays in the Contractor's progress for rain days as set forth in General Conditions Paragraph 4.04.D are to be determined as follows: 1. Include rain days in developing the schedule for construction. Schedule construction so that the Work will be completed within the Contract Times assuming that these rain days will occur. Incorporate residual impacts following rain days such as limited access to and within the Site, inability to work due to wet or muddy Site conditions, delays in delivery of equipment and materials, and other impacts related to rain days when developing the schedule for construction. Include all costs associated with these rain days and residual impacts in the Contract Price. Supplementary Conditions 007300- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 2. A rain day is defined as any day in which the amount of rain measured by the National Weather Services at the Power Street Stormwater Pump Station is 0.50 inch or greater. Records indicate the following average number of rain days for each month: Month Day Month Days January 3 July 3 February 3 August 4 March 2 September 7 April 3 October 4 May 4 November 3 June 4 December 3 3. A total of 29 rain days have been set for this Project. An extension of time due to rain days will be considered only after 29 rain days have been exceeded in a calendar year and the OAR has determined that a detrimental impact to the construction schedule resulted from the excessive rainfall. Rain days are to be incorporated into the schedule and unused rain days will be considered float time which may be consumed by the Owner or Contractor in delay claims. SC-5.03 SUBSURFACE AND PHYSICAL CONDITIONS A. This Supplementary Condition identifies documents referenced in General Conditions Paragraph 5.03.A which describe subsurface and physical conditions. 1. Geotechnical Reports include the following: 1) Supplement No. 1, subsurface exploration, laboratory testing program, and pavement recommendations for the proposed, by Rock Engineering& Testing Laboratory, Inc. dated April 21, 2017. 2) Subsurface exploration, laboratory testing program, and pavement recommendations for the proposed Ralston Avenue improvements, by Rock Engineering&Testing Laboratory, Inc. dated January 30, 2017. 2. Drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) include the following: None. SC-5.06 HAZARDOUS ENVIRONMENTAL CONDITIONS AT SITE A. No reports of explorations or tests for Hazardous Environmental Conditions at or contiguous to the Site are known to Owner. ARTICLE 7—CONTRACTOR'S RESPONSIBILITIES SC-7.04 CONCERNING SUBCONTRACTORS, SUPPLIERS,AND OTHERS A. Add the following sentence to the end of Paragraph 7.04.A: "The Contractor must perform at least 50 percent of the Work, measured as a percentage of the Contract Price, using its own employees." Supplementary Conditions 007300-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 END OF SECTION Supplementary Conditions 007300-3 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 011100 SUMMARY OF WORK 1.00 GENERAL 1.01 WORK INCLUDED A. Construct Work as described in the Contract Documents. 1. Provide the materials, equipment, and incidentals required to make the Project completely and fully useable. 2. Provide the labor, equipment, tools, and consumable supplies required for a complete Project. 3. The Contract Documents do not indicate or describe all of the Work required to complete the Project. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the OAR. 1.02 DESCRIPTION OF WORK A. Work is described in general, non-inclusive terms as: 1. Remove and replace 2600 LF of existing residential road, pavement, and curb and gutter section. 2. Construct new storm facilities. 3. Provide minor improvements to water system within project. 4. Construct new sidewalks and driveways. 5. The project includes base bids for two pavements alternatives: Base Bid 1—(A) "Concrete" and Base Bid 2—(B) "Asphalt." Bidders have the option of submitting a bid for either Base Bid 1 or Base Bid 2 or may submit bids for both Base Bids 1 and 2. 1.03 WORK UNDER OTHER CONTRACTS A. The following items of work are not included in this Contract, but may impact construction scheduling and completion: 1. None. B. In the case of a disagreement between the above list and those specified elsewhere in the Contract Documents, the Contractor is to base his Proposal on the most expensive listing. C. Completion of the Work described in this Contract may impact the construction and testing of the items listed above. 1. Coordinate construction activities through the OAR. 2. Pay claims for damages which result from the late completion of the Project or any specified Milestones. Summary of Work 011100- 1 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 01-13-2016 1.04 WORK BY OWNER A. The Owner plans to perform the following items of work which are not included in this Contract, but may impact the construction scheduling and completion: 1. None. B. Completion of the Work described in this Contract may impact the construction of the items listed above. 1. Coordinate construction activities through the OAR. 2. Pay claims for damages which result from the late completion of the Project or any specified Milestones. C. Owner will provide normal operation and maintenance of the existing facilities during construction, unless otherwise stated. 1.05 CONSTRUCTION OF UTILITIES A. Pay for temporary power, including but not limited to construction cost, meter connection fees, and permits. 1.06 USE PRIOR TO FINAL COMPLETION A. Owner has the right to use or operate any portion of the Project that is ready for use after notifying the Contractor of its intent to do so. B. The execution of Bonds is understood to indicate the consent of the surety to these provisions for use of the Project. C. Provide an endorsement from the insurance carrier permitting use of Project during the remaining period of construction. D. Conduct operations to insure the least inconvenience to the Owner and general public. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Summary of Work 011100-2 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 01-13-2016 01 23 10 ALTERNATES AND ALLOWANCES 1.00 GENERAL 1.01 REQUIREMENTS A. Alternates: 1. This Section describes each alternate by number and describes the basic changes to be incorporated into the Work when this alternate is made a part of the Work in the Agreement. 2. Drawings and Specifications will outline the extent of Work to be included in the alternate Contract Price. 3. Coordinate related Work and modify surrounding Work as required to properly integrate the Work under each alternate, and provide a complete and functional Project as required by the Contract Documents. 4. Bids for alternates may be accepted or rejected at the option of the Owner. 5. Owner may incorporate these alternates in the Contract when executed, or may issue a Change Order to incorporate these alternates within 120 days at the prices offered in the Bid, unless noted otherwise. A Request for a Change Proposal may be issued after 120 days or other designated time period to negotiate a new price for incorporating the Work into the Project. B. Allowances: 1. Include specified allowance amount in the Contract Price. 2. The amount of each allowance includes: a. The cost of the product to the Contractor less any applicable trade discounts. b. Delivery to the Site. C. Applicable taxes. 3. Include in the Contract Price all costs for: a. Handling at the Site, including unloading, uncrating, and storage per SECTION 01 3100 PROJECT MANAGEMENT AND COORDINATION. b. Cost for labor and equipment for installation and finishing. C. Cost for related products not specifically listed in the allowance required for installation, including consumable supplies and materials. d. All overhead, profit, and related costs. 4. Assist Owner in the selection of products. a. Identify qualified Suppliers. b. Obtain bids from qualified Suppliers. C. Present available alternates to the Owner through the OAR. Notify OAR of: 1) Any objections to a particular Supplier or product. Alternates and Allowances 012310-1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 2) Effect on the Construction Schedule anticipated by the selection of each option. 3) Cost of each option. 5. Upon selection of the product: a. Purchase and install the product. b. Contractor's responsibilities for products shall be the same as for products selected by the Contractor. 6. Submit a Change Proposal per SECTION 01 31 14 CHANGE MANAGEMENT to adjust Contract Price if the net cost of the product is more or less than the specified amount. a. Adjust the unit cost applied to the quantities installed per the method of payment described in SECTION 0129 00 APPLICATION FOR PAYMENT PROCEDURES for products specified as Unit Price Work. b. Do not perform Work until selection of alternate has been approved by the Owner. C. Provide actual invoices for the materials. 1.02 DOCUMENT SUBMITTALS A. Provide documents for materials furnished as part of the alternate in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT. 1.03 DESCRIPTION OF ALTERNATES (NOT USED) 1.04 DESCRIPTION OF ALLOWANCES A. The Lump Sum Bid Items described as 'Allowances' have been set as noted and shall be included in the Total Base Bid of the Bid Form for each Bidder. These Allowances may be used at the Owner's discretion in the event that unforeseen conditions or conflicts are encountered during construction which warrant the use of the Allowance funds. Should the use of Allowance funds become necessary, the OAR will provide written authorization at a unit cost as provided for a similar bid item, or at a negotiated cost between the OAR and the Contractor if a similar bid item does not exist. No work is to be performed under the Allowance items without written authorization from the OAR. There is no guarantee that any of these funds will need to be used during the course of the work. B. Allowance B—Street Improvements. 1. The sum of$20,000.00 to be used for the purchase of Unanticipated Street Improvements. C. Allowance C—ADA Improvements. 1. The sum of$5,000.00 to be used for the purchase of Unanticipated ADA Improvements. D. Allowance D—Drainage Improvements. 1. The sum of$10,000.00 to be used for the purchase of Unanticipated Drainage Improvements. Alternates and Allowances 012310-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 E. Allowance E—Water Improvements. 1. The sum of$5,000.00 to be used for the purchase of Unanticipated Water Improvements. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Alternates and Allowances 012310-3 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 01 29 00 APPLICATION FOR PAYMENT PROCEDURES 1.00 GENERAL 1.01 WORK INCLUDED A. Submit Applications for Payment for completed Work and for materials and equipment in accordance with the General Conditions, the Supplementary Conditions, the Agreement, and this Section. The Contract Price is to include costs for: 1. Providing the Work in accordance with the Contract Documents; 2. Installing Owner furnished equipment and materials; 3. Providing Work for Alternates and Allowances; 4. Commissioning, start-up, training and initial maintenance and operation; 5. Acceptance testing in manufacturer's facilities or on Site; 6. All home office overhead costs and expenses, including profit made directly or indirectly for the Project; 7. Project management, Contract administration, field office, and field operations staff, including supervision, clerical support, and technology system support; 8. Professional services including design fees, legal fees, and other professional services; 9. Bonds and insurance; 10. Permits, licenses, patent fees, and royalties; 11. Taxes; 12. Providing all documents and Samples required by the Contract Documents; 13. Facilities and equipment at the Site including: a. Field offices, office furnishings, and all related office supplies, software, and equipment, b. Storage facilities for Contractor's use, storage facilities for stored materials and equipment, including spare parts storage, C. Shops, physical plant, construction equipment, small tools, vehicles, technology and telecommunications equipment, d. Safety equipment and facilities to provide safe access and working conditions for workers and for others working at the Site, e. Temporary facilities for power and communications, f. Potable water and sanitation facilities, and g. Mobilization and demobilization for all of these facilities and equipment; 14. Products, materials, and equipment stored at the Site or other suitable location; 15. Products, materials, and equipment permanently incorporated into the Project; Application for Payment Procedures 012900- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 03-11-2015 16. Temporary facilities for managing water, including facilities for pumping, storage, and treatment as required for construction and protection of the environment; 17. Temporary facilities for managing environment conditions and Constituents of Concern; 18. Temporary facilities such as sheeting, shoring, bracing, formwork, embankments, storage facilities,working areas, and other facilities required for construction of the Project; 19. Temporary and permanent facilities for protection of all overhead, surface, or underground structures or features; 20. Temporary and permanent facilities for removal, relocation, or replacement of any overhead, surface, or underground structures or features; 21. Products, materials, and equipment consumed during the construction of the Project; 22. Contractor labor and supervision to complete the Project, including that provided through Subcontractors or Suppliers; 23. Correcting Defective Work during the Contract Times, during the Correction Period, or as required to meet any warranty provision of the Contract Documents; 24. Risk associated with weather and environmental conditions, start-up, and initial operation of facilities including equipment, processes, and systems; 25. Contractor's safety programs, including management, administration, and training; 26. Maintenance of facilities, including equipment, processes, and systems until operation is transferred to Owner; 27. Providing warranties, extended or special warranties, or extended service agreements; 28. Cleanup and disposal of any and all surplus materials; and 29. Demobilization of all physical, temporary facilities not incorporated into the Project. B. Include the cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the Contract Price. C. Provide written approval of the surety company providing Bonds for the Schedule of Values, Application for Payment form, and method of payment prior to submitting the first Application for Payment. Submit approval using the Consent of Surety Company to Payment Procedures form provided. Payment will not be made without this approval. D. OAR may withhold processing Applications for Payment if any of the following processes or documentation are not up to date: 1. Progress Schedule per SECTION 0133 04 CONSTRUCTION PROGRESS SCHEDULE. 2. Project photographs per SECTION 0133 05 VIDEO AND PHOTOGRAPHIC DOCUMENTATION. 3. Record Documents per SECTION 01 31 13 PROJECT COORDINATION. 4. Documentation required to comply with Owner's Minority/ MBE/ DBE Participation Policy. Application for Payment Procedures 012900-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 03-11-2015 1.02 SCHEDULE OF VALUES A. Submit a detailed Schedule of Values for the Work at least 10 days prior to submitting the first Application for Payment. B. Submit the Schedule of Values in the form for Attachment A-Tabulation of Earned Value of Original Contract Performed. C. Do not submit an Application for Payment until the Schedule of Values has been approved by the OAR. D. Use each unit price line item in the Agreement as a unit price line item in the Schedule of Values. E. Divide lump sum line items, including Subcontractor and Supplier amounts in the Schedule of Values into smaller components to allow more accurate determination of the earned value for each item. 1. Provide adequate detail to allow a more accurate determination of the earned value expressed as a percentage of Work completed for each item. 2. Line items may not exceed $50,000.00, unless they are for products, materials, or equipment permanently incorporated into the Project that cannot be subdivided into units or subassemblies. 3. Lump sum items may be divided into an estimated number of units to determine earned value. a. The estimated number of units times the cost per unit must equal the lump sum amount for that line item. b. Contractor will receive payment for the lump sum for the line item, regardless of the number of units installed, unless an adjustment is made by Change Order. 4. Include Contractor's overhead and profit in each line item in proportion to the value of the line item to the Contract Price. 5. Include the cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the Contract Price for each item. 6. These line items may be used to establish the value of Work to be added or deleted from the Project. 7. The sum of all values listed in the schedule must equal the total Contract Price. F. Subdivide each line item in the Schedule of Values into two payment components. The first component is the direct cost for products, materials, and equipment permanently incorporated into the Project. The second component is all other cost associated with the item in the Agreement. The sum of the two components must equal the value of the line item in the Schedule of Values. G. Where a percentage of the line value is allowed for a specified stage of completion, show the value for each stage of completion as a component of that line item cost. Application for Payment Procedures 012900-3 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 03-11-2015 1.03 SCHEDULE OF ANTICIPATED PAYMENTS AND EARNED VALUE A. Submit a schedule of the anticipated Application for Payments showing the application numbers, submission dates, and the anticipated amount to be requested. Incorporate retainage into the development of this schedule of anticipated payments. B. Submit a tabulation of the anticipated Total Earned Value of Fees, Work, and Materials to create a graphic (curve) representation of the anticipated progress on the Project each month. Adjust this table and curve to incorporate Modifications. Use this curve to compare actual progress on the Project each month by comparing the anticipated cumulative Total Earned Value of Fees,Work, and Materials to the actual Total Earned Value of Fees,Work, and Materials each month. Use the comparison of values to determine performance on budget and schedule. C. Update the Schedule of Payments as necessary to provide a reasonably accurate indication of the funds required to make payments each month to the Contractor for Work performed. 1.04 BASIS FOR PAYMENTS A. Lump Sum Contracts: 1. Payment will be made for the earned value of Work completed during the payment period expressed as a percentage of Work completed for each line item during the payment period per the Contract Documents. 2. Payment amount is the value of Work completed per the Contract Documents multiplied by the percentage of Work completed. 3. Payment for lump sum items divided into an estimated number of units to determine earned value per Paragraph 1.02.E.3 will be made for the measured number of units. 4. Payment for stored materials and equipment will be made per Paragraph 1.05. B. Unit Price Contracts: 1. Payment will be made for the actual quantity of Work completed during the payment period and for materials and equipment stored during the payment period per the Contract Documents. a. Payment amount is the Work quantity measured per the Contract Documents multiplied by the unit prices for that line item in the Agreement. b. Payment for stored materials and equipment will be made per Paragraph 1.05. 2. Measure the Work described in the Agreement for payment. Payment will be made only for the actual measured and/or computed length, area, solid contents, number, and weight, unless other provisions are made in the Contract Documents. Payment on a unit price basis will not be made for Work outside finished dimensions shown in the Contract Documents. Include cost for waste, overages, and tolerances in the unit price for that line item. 1.05 PAYMENT FOR STORED MATERIALS AND EQUIPMENT. A. Store materials and equipment properly at the Site. Application for Payment Procedures 012900-4 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 03-11-2015 1. Payment will be made for the invoice amount less the specified retainage. 2. Payment for materials and equipment show in the Application for Payment on Attachment A or Attachment B-Tabulation of Work on Approved Contract Modifications will be made for the invoice amount, up to the value show in the Schedule of Values for that line item. Costs for material and equipment in excess of the value shown in the Schedule of Values may not be added to other line items. 3. Payment will be made in full for the value shown in the line item for products and materials if invoices for materials and equipment are less than the amount shown in the line item and it can be demonstrated that no additional materials or equipment are required to complete Work described in that item. 4. Provide invoices at the time materials are included on Attachment D -Tabulation of Values for Materials and Equipment. Include invoice numbers on Attachment D so that a comparison can be made between invoices and amounts included on Attachment D. B. Provide a bill of sale, invoice, or other documentation warranting that Owner has received the materials and equipment free and clear of Liens. Provide documentation of payment for materials and equipment with the next Application for Payment. Adjust payment to the amount actually paid if this differs from the invoice amount. Remove items from the tabulation of materials and equipment if this documentation is not provided. Payment will not be made for material and equipment without documentation of payment. C. Contractors can be paid for non-perishable materials on hand stored at the site, provided that invoices are furnished to the City for verification of the material value; and provide documents, satisfactory to the City, that show that the material supplier has been paid for the materials delivered to the work site. D. Provide evidence that the materials and equipment are covered by appropriate property insurance or other arrangements to protect Owner's interest. E. The Work covered by progress payments becomes the property of the Owner at the time of payment. The Contractor's obligations with regard to proper care and maintenance, insurance, and other requirements are not changed by this transfer of ownership until accepted in accordance with the General Conditions. F. Payment for materials and equipment does not constitute acceptance of the product. 1.06 ALTERNATES AND ALLOWANCES A. Include amounts for specified Alternate Work in the Agreement in accordance with SECTION 0123 10 ALTERNATES AND ALLOWANCES. B. Include amounts for specified Allowances for Work in the Agreement in accordance with SECTION 0123 10 ALTERNATES AND ALLOWANCES. 1.07 RETAINAGE AND SET-OFFS A. Retainage will be withheld from each Application for Payment per the Agreement. Retainage will be released per the General Conditions. Application for Payment Procedures 012900-5 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 03-11-2015 B. Reduce payments for set-offs per the General Conditions. Include Attachment C— Tabulation of Set-Offs in the Application for Payment. 1.08 PROCEDURES FOR SUBMITTING AN APPLICATION FOR PAYMENT A. Submit a draft Application for Payment to the OAR each month at least 20 days before the date established in the Agreement for Owner to make progress payments. Do not submit Applications for Payment more often than monthly. Review the draft Application for Payment with the OAR to determine concurrence with: 1. The earned value for each lump sum item including the value of properly stored and documented materials and equipment for each item in the original Contract. 2. The quantity of Work completed for each unit price item. 3. Set-offs included in the Application for Payment. 4. Values requested for materials and equipment consistent with invoices for materials and equipment. B. Submit Applications for Payment monthly through the OAR after agreement has been reached on the draft Application for Payment. 1. Number each application sequentially and include the dates for the application period. 2. Show the total amounts for earned value of original Contract performed, earned value for Work on approved Contract Amendments and Change Orders, retainage, and set- offs. Show total amounts that correspond to totals indicated on the attached tabulation for each. 3. Include Attachment A to show the earned value on each line item in the Schedule of Values for Work shown in the original Contract. 4. Include Attachment B to show the earned value on line item for approved Change Orders. Add items to Attachment B as Change Orders are approved. Change Orders must be approved before payment can be made on Change Order items. 5. Include Attachment C to document set-offs required per the Contract Documents. Show each set-off as it is applied. Show a corresponding line item to reduce the Set off amount if a payment held by a set-off is released for payment. 6. Include Attachment D to allow tracking of invoices used to support amounts requested as materials in Attachments A and B. Enter materials to show the amount of the invoice assigned to each item in Attachment A or B if an invoice includes materials used on several line items. 7. Complete the certification stating that all Work, including materials and equipment, covered by this Application for Payment have been completed or delivered and stored in accordance with the Contract Documents, that all amounts have been paid for Work, materials, and equipment for which previous payments have been made by the Owner, and that the current payment amount shown in this Application for Payment is now due. Application for Payment Procedures 012900-6 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 03-11-2015 C. Submit attachments in Portable Document Format (PDF): 1. Generate attachments to the Application for Payment using the Excel spreadsheet provided. 2. Submit PDF documents with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. 1.09 RESPONSIBILITY OF OWNER'S AUTHORIZED REPRESENTATIVE A. OAR will review draft Application for Payment with Contractor to reach an agreement on the values that will be recommended for payment by the OAR. B. OAR will review Application for Payment submitted by Contractor to determine that the Application for Payment has been properly submitted and is in accordance with the agreed to draft Application for Payment. C. OAR is to either recommend payment of the Application for Payment to Owner or notify the Contractor of the OPT's reasons for not recommending payment. Contractor may make necessary corrections and resubmit the Application for Payment if it is not recommended within 10 days after receipt of the notice. OAR will review resubmitted Application for Payment and reject or recommend payment of the Application for Payment to Owner as appropriate. D. OAR's recommendation of the Application for Payment constitutes a representation by OPT that based on their experience and the information available: 1. The Work has progressed to the point indicated; 2. The quality of the Work is generally in accordance with the Contract Documents; and 3. Requirements prerequisite to payment have been met. E. This representation is subject to: 1. Further evaluation of the Work as a functioning whole; 2. The results of subsequent tests called for in the Contract Documents; or 3. Any other qualifications stated in the recommendation. F. OPT does not represent by recommending payment: 1. Inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work; or 2. Other matters or issues between the parties that might entitle Contractor to additional compensation or entitle Owner to withhold payment to Contractor may or may not exist. G. Neither OPT's review of Contractor's Work for the purposes of recommending payments nor OAR's recommendation of payment imposes responsibility on OPT: 1. To supervise, direct, or control the Work; Application for Payment Procedures 012900-7 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 03-11-2015 2. For the means, methods,techniques, sequences, or procedures of construction, or safety precautions and programs; 3. For Contractor's failure to comply with Laws and Regulations applicable to Contractor's performance of the Work; 4. To make examinations to ascertain how or for what purposes Contractor has used the monies paid on account of the Contract Price; or 5. To determine that title to the Work, materials, or equipment has passed to Owner free and clear of Liens. 1.10 FINAL APPLICATION FOR PAYMENT A. Include adjustments to the Contract Price in the final Application for Payment for: 1. Approved Change Orders and Contract Amendments, 2. Allowances not previously adjusted by Change Order, 3. Deductions for Defective Work that has been accepted by the Owner, 4. Penalties and bonuses, 5. Deductions for liquidated damages, 6. Deduction for all final set-offs, and 7. Other adjustments if needed. B. OAR will prepare a final Change Order reflecting the approved adjustments to the Contract Price which have not been covered by previously approved Change Orders and if necessary reconcile estimate unit price quantities with actual quantities. C. Submit the final Application for Payment per the General Conditions, including the final Change Order. Provide the following with the Final Application for Payment: 1. Evidence of payment or release of liens on the forms provided and as required by the General Conditions. 2. Consent from Surety to Final Payment. 1.11 PAYMENT BY OWNER A. Owner is to pay the amount recommended for monthly payments within 30 days after receipt of the OAR's recommended Application for Payment. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Application for Payment Procedures 012900-8 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 03-11-2015 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT 1.00 GENERAL 1.01 MEASUREMENT AND BASIS FOR PAYMENTS ON LUMP SUM ITEMS A. Include all cost for completing the Work in accordance with the Contract Documents for lump sum payment items. Include all direct cost for the Work associated with that lump sum item and a proportionate amount for the indirect costs as described in SECTION 0129 00 APPLICATION FOR PAYMENT PROCEDURES for each lump sum item. Include cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the lump sum price. B. Measurement for progress payments will be made on the basis of the earned value for each item shown as a percentage of the cost for the lump sum item as described in SECTION 0129 00 APPLICATION FOR PAYMENT PROCEDURES. Payment at Final Completion will be equal to the total lump sum amount for that item. 1.02 MEASUREMENT AND BASIS FOR PAYMENTS ON UNIT PRICE ITEMS A. Include all cost for completing the Work in accordance with the Contract Documents in unit price payment items. Include all direct cost for the Work associated with that unit price item and a proportionate amount for the indirect costs as described in SECTION 0129 00 APPLICATION FOR PAYMENT PROCEDURES for each unit price item. Include cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the unit price. B. Measurement for payments will be made only for the actual measured and/or computed length, area, solid contents, number, and weight, unless other provisions are made in the Contract Documents. Payment on a unit price basis will not be made for Work outside finished dimensions shown in the Contract Documents. Include cost for waste, overages, and tolerances in the unit price for that line item. Measurement will be as indicated for each unit price item. 1.03 MEASUREMENT AND BASIS FOR PAYMENT FOR BASE BID ITEMS A. Bid Item A-A1, B-A1 - Mobilization: 1. Include the following costs in this Bid item: a. Transportation and setup for equipment; b. Transportation and/or erection of all field offices, sheds, and storage facilities; C. Salaries for preparation of documents required before the first Application for Payment; d. Salaries for field personnel assigned to the Project related to the mobilization of the Project; e. Demobilization; and f. Mobilization may not exceed 5 percent of the total Contract Price. Measurement and Basis for Payment 0129 01- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 2. Measuring for payment is on a lump sum basis. Payment for mobilization will be based on the earned value of Work completed. B. Bid Item A-A2, B-A2 - Bonds and Insurance: 1. This item shall be measured by Lump Sum. 2. This Item shall include the following costs: a. Bonding and Insurance C. Bid Item A-A3, B-A3—Ozone Action Days: 1. This item shall be measured by Day. 2. This item shall include Monetary loss caused by inability to work on officially announced Ozone Action Days. D. Bid Item A-A4, B-A4—Traffic Control Plan Mobilization/Adjustments: 1. This item shall be measured by Lump Sum. 2. This item shall include but is not limited to the following work: a. Preparation and original placement of a traffic control plan. b. Any other items required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. E. Bid Item A-A5, B-A5—Traffic Control BMPs (Barrels, Cons, Etc): 1. This item shall be measured by Month. 2. This item shall include but is not limited to the following work: a. Placement and maintenance of Bid Item. b. Any other items required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. F. Bid Item A-A6, B-A6—Utility Coordination: 1. This item shall be measured by Lump Sum. 2. This item shall include but is not limited to the following work: 3. Within the contract, plans and specifications there are numerous requirements for coordination with owner, and utilities (City, AT&T, AEP, etc.).This pay item is to pay the contractor for meeting all these requirements within the contract.The bidding of this item is acknowledgement that the contractor understands and will provide all coordination of utilities, as necessary, to construct the project as shown.This includes all costs of meetings, extra research, labor, equipment, and subcontracts. All time constraints and delays as the result of utility coordination and other associated costs related to these requirements are included. Payment for Utility Coordination will be bases on percentage of the lump sum amount prorated over the course of the project duration. Measurement and Basis for Payment 0129 01-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 G. Bid Item A-A7, B-A7—Clear ROW: 1. This item shall be measured by Acre. 2. Item shall include but is not limited to: a. Excavation of roots, stumps, grasses, and other items far enough below ground to not effect construction of proposed improvements. b. Backfill of excavations. C. Removal of cleared material. d. Any other items required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. H. Bid Item A-A8, B-A8-SWPPP: 1. This item shall be measured by Lump Sum. 2. This item shall include but is not limited to the following work: a. Maintaining paperwork and permitting as required by state regulation. b. Any other items required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. I. Bid Item A-A9, B-A9—Silt Fence: 1. This item shall be measured by Linear Foot. 2. This item shall include but is not limited to the following work: a. Furnish, Install, Maintain, then remove Silt Fence. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. J. Bid Item A-A10, B-A10— Inlet Protection: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Furnish, Install, Maintain, then remove Inlet Protection. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. K. Bid Item A-A11, B-A11—Sod: 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Finish grading. b. Placement of Sod, including all practices to insure growth. C. Proper establishment of growth. d. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. Measurement and Basis for Payment 0129 01-3 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 L. Bid Item A-131—6"Jointed Reinforced Concrete Pavement: 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Final subgrade a preparation, concrete, reinforcement, and jointing. b. Any other items required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. M. Bid Item B-131—2" HMAC (Type 'D'): 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Furnish and install tack coat as necessary. b. Furnish and install Hot Mix Asphaltic Concrete. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. N. Bid Item A-132—Lime Stabilized Subgrade (7.5% by weight): 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Application of lime to subgrade. b. Compaction and finish grading as required. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. O. Bid Item 13-132—Prime Coat (0.15 Gal/SY): 1. This item shall be measured by Gallon. 2. This item shall include but is not limited to the following work: a. Application and maintenance of seal coat. b. Any other items required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. P. Bid Item B-133—Limestone Base (Type A, Grade 1-2) (6" Min): 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Furnish and install all base material. b. Grading and compaction of Base. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. Measurement and Basis for Payment 0129 01-4 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 Q. Bid Item A-133, B-135—12" Compacted Subgrade: 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Grading and compaction of Subgrade. b. Where subgrade is lime stabilized this item shall include payment for compaction of the top 12" of subgrade including the lime stabilized portion. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. R. Bid Item B-134—Geogrid (TX-5): 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Furnish and Install Geogrid. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. S. Bid Item A-134, B-136—HMAC Pavement Transitions: 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Demolition, saw-cutting, removal and disposal of existing material. b. 8" Compacted subgrade. C. Geogrid (Tx-5) d. Furnish and install 8" limestone (Type A, Grade 1) base material. e. Furnish and install prime coat. f. Furnish and install 2" Hot Mix Asphaltic Concrete. (Type D) g. Re-striping. h. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. T. Bid Item A-135, B-137—Salvage and Remove Existing Pavement: 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Removing existing asphalt b. Re-stratifying material to meet particle size requirements. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. Measurement and Basis for Payment 0129 01-5 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 U. Bid Item A-136, B-138—Concrete Driveway: 1. This item shall be measured by Square Foot. 2. This item shall include but is not limited to the following work: a. Furnish and install subgrade preparation, concrete, reinforcement, and jointing. b. Pavement shall begin and end at the point where the sidewalk joints to the thicker section required for the Driveway. C. This item shall pay for driveways as required to meet the slope requirements detailed in the plans. d. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. V. Bid Item A-137, B-139—Roadway Excavation: 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Reshaping existing material for proposed grade changes b. Removal, haul off, and placement of material as necessary. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. W. Bid Item A-138, B-1310—Curb and Gutter Removal: 1. This item shall be measured by Linear Foot. 2. This item shall include but is not limited to the following work: a. Deconstruction, removal, haul off, and disposal of existing curb and gutter material. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. X. Bid Item A-139, B-1311—Sidewalk Removal: 1. This item shall be measured by Square Foot. 2. This item shall include but is not limited to the following work: a. Deconstruction, Removal, haul off, and disposal of existing sidewalk. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. Y. Bid Item A-1310, B-1312—Driveway Removal: 1. This item shall be measured by Square Foot. 2. This item shall include but is not limited to the following work: a. Deconstruction, Removal, haul off, and disposal of existing driveway. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. Measurement and Basis for Payment 0129 01-6 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 Z. Bid Item A-1311, B-1313—Street Sign Assembly w/9" blades and Stop Sign: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Furnish and Install Stop Sign, Blades, and sign assemblies. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. AA. Bid Item A-1312, B-1314—Other Regulatory Signs: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Furnish and install sign, pole, and assemblies. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. BB. Bid Item A-1313, B-1315—Allowance for Unanticipated Street Improvements: 1. This item shall be measured by Lump Sum. 2. This item shall include but is not limited to the following work: a. Any street improvements not covered by a bid item. b. Any quantity over run of other bid items. C. Prices must be negotiated for each new bid item. CC. Bid Item A-C1, B-C1—Concrete Sidewalk: 1. This item shall be measured by Square Foot. 2. This item shall include but is not limited to the following work: a. Furnish and install base preparation, concrete, reinforcement, and jointing. b. Pavement shall begin and end at the point where the sidewalk joints to the thicker section required for the Driveway. C. This item shall pay for sidewalks as required to meet the slope requirements detailed in the plans. d. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. DD. Bid Item A-C2, B-C2—RAP Under Sidewalk/Driveway: 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Finish Grading of Subgrade. b. Furnish and Install RAP Material. C. Grading and compaction of Base. d. Maintenance of base prior to place of sidewalk. Measurement and Basis for Payment 0129 01-7 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 e. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. EE. Bid Item A-C3, B-C3—Sidewalk Retaining Curb: 1. This item shall be measured by Linear Foot, regardless of height. 2. This item shall include but is not limited to the following work: a. Furnish and install all concrete, expansion joints, reinforcement, and ties to existing or proposed concrete sidewalk. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. FF. Bid Item A-C4, B-C4—Accessible Ramps: 1. This item shall be measured by Square Foot. 2. This item shall include but is not limited to the following work: a. Furnish and install concrete, reinforcement,jointing, truncated domes, and curb surrounding ramps. b. Payment and include all ramps, landing and additional retaining curb relative to Accessible Ramps. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. GG. Bid Item A-05, B-05—Allowance for Unanticipated ADA Improvements: 1. This item is an Allowance for Unanticipated items. Payment and Measurement shall be negotiated per item. HH. Bid Item A-DI, B-D1—6" Standard Curb and Gutter: 1. This item shall be measured by Linear Foot. 2. This item shall include but is not limited to the following work: a. Removal of existing curb. b. Providing, placing, and compacting subgrade. C. Furnish and install all concrete, expansion joints, reinforcement, and ties to existing or proposed concrete pavement. d. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. II. Bid Item A-D2, B-D2—5' Curb Inlet: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Reinforced Concrete installed by open cut excavation; including removing all material encountered and disposing of all unsuitable and/or excess material. Grading and cleaning up of pipe trench and affected area. b. Excavation required to perform work. Measurement and Basis for Payment 0129 01-8 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 C. Furnishing and installing concrete, reinforcement, and jointing materials. d. Furnishing and installing bedding and backfill. e. Furnishing and installing protective measures for utilities with minimal clearance. f. OSHA trench protection as required. g. Dewatering as required. h. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. JJ. Bid Item A-D3, B-D3—Remove Existing Inlet: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Demolition of all abandoned inlets. b. Removal of material from site. C. Backfill and compaction as necessary. d. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. KK. Bid Item A-D4, B-D4—Remove Existing Pipe (Up to 24"): 1. This item shall be measured by Linear Foot. 2. This item shall include but is not limited to the following work: a. Demolition of all abandoned storm pipe. b. Removal of material from site. C. Backfill and compaction as necessary. d. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. LL. Bid Item A-D5, B-D5—Manhole Ring and Cover Adjustment: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Minor reworking of existing manhole, corbel, ring and cover as necessary to change finished elevation of manhole cover to match new pavement. b. May include replacement of the ring and cover as necessary. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. MM.Bid Item A-D6, B-D6—Storm Manhole (Type 'A'): 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: Measurement and Basis for Payment 0129 01-9 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 a. Manhole installed by open cut excavation; including removing all material encountered and disposing of all unsuitable and/or excess material. Grading and clearing up of pipe trench and affected area. b. Excavation required to perform work. C. Furnishing and installing concrete, reinforcement, and jointing materials. d. Furnishing and installing backfill. e. OSHA trench protection as required. f. Dewatering as required. g. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. NN. Bid Item A-D7, B-D7—Tie to Existing Manhole: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Any Cost of tie-in between proposed storm main and existing manholes or inlets.. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. 00. Bid Item A-D8, B-D8—18" RCP: 1. This item shall be measured by Linear Foot. 2. This item shall include but is not limited to the following work: a. Reinforced Concrete Pipe installed by open cut trench excavation; including removing all material encountered and disposing of all unsuitable and/or excess material. Grading and cleaning up of pipe trench and affected area. b. Trenching required to perform work. C. Furnishing and installing concrete, reinforcement, and jointing materials. d. Furnishing and installing bedding and backfill. e. Furnishing and installing protective measures for utilities with minimal clearance. f. OSHA trench protection as required. g. Dewatering as required. h. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. PP. Bid Item A-D9, B-D9—24" RCP: 1. This item shall be measured by Linear Foot. 2. This item shall include but is not limited to the following work: a. Reinforced Concrete Pipe installed by open cut trench excavation; including removing all material encountered and disposing of all unsuitable and/or excess material. Grading and cleaning up of pipe trench and affected area. Measurement and Basis for Payment 01 29 01- 10 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 b. Trenching required to perform work. C. Furnishing and installing concrete, reinforcement, and jointing materials. d. Furnishing and installing bedding and backfill. e. Furnishing and installing protective measures for utilities with minimal clearance. f. OSHA trench protection as required. g. Dewatering as required. h. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. QQ. Bid Item A-D10, B-D10—Trench Safety for Storm Water Pipe: 1. This item shall be measured by Linear Foot of trench regardless of depth. 2. This item shall include but is not limited to the following work: a. Trench Safety shall be provided for any excavation or any part of a trench regardless of depth and shall include the cost to provide trench safety as set out in Specification. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. RR. Bid Item A-D11, B-D11—Safety Plan for Manholes and Inlets: 1. This item shall be measured by Each regardless of depth. 2. This item shall include but is not limited to the following work: a. Safety shall be provided for any excavation over 18". b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. SS. Bid Item A-D12, B-D12—Allowance for Unanticipated Drainage Improvements: 1. This item shall be measured by Lump Sum. 2. This item shall include but is not limited to the following work: a. Any Stormwater items not covered by a bid item. b. Any quantity over run of other bids items. C. Project must be negotiated for each new bid item. TT. Bid Item A-E1, B-E1—Fire Hydrant, Pipe and Fittings (Type 2): 1. This item shall be measured by Each fire hydrant listed in the proposal and illustrated on the plans. 2. This item shall include but is not limited to the following work: a. Supplying and installing all fittings, tees, bends, adapters, and pipe required on plans, including excavation and backfilling. b. Supply and installing the fire hydrant, gate valve, and box. Measurement and Basis for Payment 01 29 01- 11 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 C. Grading and cleaning up the affected area. d. All tapping saddles, valves, pipe, and fittings required to tie-in to the main. e. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. UU. Bid Item A-E2, B-E2—Extend Fire Hydrant Lead, Replace FH: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Cost associated with relocating hydrant. b. Furnish and installing pipe, and fittings. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. VV. Bid Item A-E3, B-E3—6" D. I. Water Main: 1. This item shall be measured by Linear Foot. 2. This item shall include but is not limited to the following work: a. Pipe installed by open cut trench excavation; including removing all material encountered and disposing of all unsuitable and/or excess material. Grading and cleaning up of pipe trench and affected area. b. Furnishing and installing pipe with a#12 copper coated W.P. detector wire. C. Hydrostatic testing and flushing of completed lines. d. Sterilizing of compacting water lines. e. Placing and compacting backfill. f. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. WW. Bid Item A-E4, B-E4—6" D. I. 45° Bend: 1. This item shall be measured by Each ductile iron fitting. 2. This item shall include but is not limited to the following work: a. Furnish and install ductile iron fitting. b. Embedment. C. Furnish and install Polyethylene Wrap. d. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. XX. Bid Item A-E5, B-E5—Valve Box Adjustment: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Reworking of Existing Valve Box to match proposed grade. Measurement and Basis for Payment 01 29 01- 12 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. YY. Bid Item A-E6, B-E6—Service Connection Replacement: 1. This item shall be measured by Each individual service of each type installed and shall include all pipe, fillings, etc., as required to complete the service from the new water line to the meter. 2. This item shall include but is not limited to the following work: a. Installation of new Corp Stop. b. All other parts and pieces required. C. Replacement of waterline. d. Tie in to existing service. e. Removal of all existing materials abandoned by this activity. f. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. ZZ. Bid Item A-E7, B-E7—Trench Safety for Water Main: 1. This item shall be measured by Linear Foot of trench regardless of depth. 2. This item shall include but is not limited to the following work: a. Trench safety shall be provided for any excavation or any part of a trench regardless of depth and shall include the cost to provide trench safety as set out in in the specifications. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. AAA. Bid Item A-E8, B-E8—Allowance for Unanticipated Water Improvements: 1. This item shall be measured by Lump Sum. 2. This item shall include, but is not limited to the following work: a. Any water improvements not covered by a bid item. b. Any quantity over run of other bid items. C. Prices must be negotiated for each new bid item. 1.04 MEASUREMENT AND BASIS FOR PAYMENT FOR ALTERNATES AND ALLOWANCES(NOT USED) 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Measurement and Basis for Payment 01 29 01- 13 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 013100 PROJECT MANAGEMENT AND COORDINATION 1.00 GENERAL 1.01 WORK INCLUDED A. Furnish resources required to complete the Project with an acceptable standard of quality within the Contract Times. B. Construct Project in accordance with current safety practices. C. Manage Site to allow access to Site and control construction operations. D. Construct temporary facilities to provide and maintain control over environmental conditions at the Site. Remove temporary facilities when no longer needed. E. Provide temporary controls for pollutions, management of water and management of excess earth as required in SECTION 0157 00 TEMPORARY CONTROLS. 1.02 QUALITY ASSURANCE A. Employ competent workmen, skilled in the occupation for which they are employed. Provide Work meeting quality requirements of the Contract Documents. B. Remove Defective Work from the Site immediately unless provisions have been made and approved by the OPT to allow repair of the product at the Site. Clearly mark Work as Defective until it is removed or allowable repairs have been completed. 1.03 DOCUMENT SUBMITTAL A. Provide documents in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT. 1. Provide copies of Supplier's printed storage instructions prior to furnishing materials or products and installation instructions prior to beginning the installation. 2. Incorporate field notes, sketches, recordings, and computations made by the Contractor in Record Drawings. 1.04 PERMITS A. Obtain building permits for the Project from the local authorities having jurisdiction. Pay building permit fees and include this cost in the Contract Price. B. Obtain environmental permits required for construction at the Site. C. Provide required permits for transporting heavy or oversized loads. D. Provide other permits required to conduct any part of the Work. E. Arrange for inspections and certification by agencies having jurisdiction over the Work. F. Make arrangements with private utility companies and pay for fees associated with obtaining services, or for inspection fees. G. Retain copies of permits and licenses at the Site and observe and comply with all regulations and conditions of the permit or license. Project Management and Coordination 013100- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 1.05 SAFETY REQUIREMENTS A. Manage safety to protect the safety and welfare of persons at the Site. B. Provide safe access to move through the Site. Provide protective devices to warn and protect from hazards at the Site. C. Provide safe access for those performing tests and inspections. D. Comply with latest provisions of the Occupational Health and Safety Administration and other Laws and Regulation. E. Cooperate with accident investigations. Provide two copies of all reports, including insurance company reports, prepared concerning accidents, injury, or death related to the Project to the OAR as Record Data per SECTION 0133 03 RECORD DATA. 1.06 ACCESS TO THE SITE A. Maintain access to the facilities at all times. Do not obstruct roads, pedestrian walks, or access to the various buildings, structures, stairways, or entrances. Provide safe access for normal operations during construction. B. Provide adequate and safe access for inspections. Leave ladders, bridges, scaffolding, and protective equipment in place until inspections have been completed. Construct additional safe access if required for inspections. C. Use roadways for construction traffic only with written approval of the appropriate representatives of each entity. Roadways may not be approved for construction traffic. Obtain written approval to use roads to deliver heavy or oversized loads to the Site. Furnish copies of the written approvals to the Owner as Record Data per SECTION 0133 03 RECORD DATA. 1.07 CONTRACTOR'S USE OF SITE A. Limit the use of Site for Work and storage to those areas designated on the Drawings or approved by the OAR. Coordinate the use of the premises with the OAR. B. Provide security at the Site as necessary to protect against vandalism and loss by theft. C. Do not permit alcoholic beverages or illegal substances on the Site. Do not allow persons under the influence of alcoholic beverages or illegal substances to enter or remain on the Site at any time. Persons on Site under the influence of alcoholic beverages or illegal substances will be permanently prohibited from returning to the Site. Criminal or civil penalties may also apply. D. Park construction equipment in designated areas only and provide spill control measures as discussed in SECTION 0157 00 TEMPORARY CONTROLS. E. Park employees' vehicles in designated areas only. F. Obtain written permission of the Owner before entering privately-owned land outside of the Owner's property, rights-of-way, or easements. G. Do not allow the use of audio devices, obnoxious,vulgar or abusive language, or sexual harassment in any form. These actions will cause immediate and permanent removal of the offender from the premises. Criminal or civil penalties may apply. Project Management and Coordination 013100-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 H. Require Workers to wear clothing that is inoffensive and meets safety requirements. Do not allow sleeveless shirts, shorts, exceedingly torn, ripped, or soiled clothing to be worn on the Project. I. Do not allow firearms or weapons of any sort to be brought on to the Site under any conditions. No exception is to be made for persons with concealed handgun permits. Remove any firearms or weapons and the person possessing these firearms or weapons immediately from the Site. 1.08 PROTECTION OF EXISTING STRUCTURES AND UTILITIES A. Examine the Site and review the available information concerning the Site. Locate utilities, streets, driveways, fences, drainage structures, sidewalks, curbs, and gutters. Verify the elevations of the structures adjacent to excavations. Report any discrepancies from information in the Contract Documents to the OAR before beginning construction. B. Determine if existing structures, poles, piping, or other utilities at excavations will require relocation or replacement. Prepare a Plan of Action per SECTION 0135 00 SPECIAL PROCEDURES. Coordinate Work with local utility company and others for the relocation or replacement. C. Protect buildings, utilities, street surfaces, driveways, sidewalks, curb and gutter,fences, wells, drainage structures, piping, valves, manholes, electrical conduits, and other systems or structures unless they are shown to be replaced or relocated on the Drawings. Restore damaged items to the satisfaction of the OPT and utility owner. D. Carefully support and protect all structures and/or utilities so that there will be no failure or settlement where excavation or demolition endangers adjacent structures and utilities. Do not take existing utilities out of service unless required by the Contract Documents or approved by the OAR. Notify and cooperate with the utility owner if it is necessary to move services, poles, guy wires, pipelines, or other obstructions. E. Protect existing trees and landscaping at the Site. 1. Identify trees that may be removed during construction with OPT. 2. Mark trees to be removed with paint. 3. Protect trees to remain from damage by wrapping trunks with 2 x 4 timbers around the perimeter, securely wired in place,where machinery must operate around existing trees. Protect branches and limbs from damage by equipment. 4. Protect root zone from compaction. 1.09 PRE-CONSTRUCTION EXPLORATORY EXCAVATIONS A. Excavate and expose existing pipelines that cross within 20 feet of Project pipelines prior to any Work. Survey the line to determine its exact vertical and horizontal location at each point the existing pipeline may potentially conflict with the Work. B. Excavate and expose existing parallel pipelines at 300 feet intervals (maximum)for existing pipelines which are within 10 feet of Project pipelines. Survey the line to determine its exact vertical and horizontal location at each point where the line is excavated and exposed. Project Management and Coordination 013100-3 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 C. Prepare a Plan of Action per SECTION 0135 00 SPECIAL PROCEDURES indicating the owner of pipelines excavated and surveyed and all pertinent survey data, including the station where lines cross or conflicts may exist and the distance to the pavement centerline and elevations of the top of existing pipelines. D. Do not perform Work on the Project until all exploratory excavations have been completed and the Plan of Action has been approved by the Designer. E. Unless indicated otherwise in the Bid Form, no separate payment will be made for pre- construction exploratory excavation. Include the cost for the pre-construction exploratory excavations in the unit price for the pipe construction or other applicable feature. F. Pavement repairs associated with exploratory excavations will be paid for at the unit prices for pavement repair when an item is included in the Bid Form. When an item for pavement repair is not included in the Bid Form the cost should be included in the unit price for the pipe construction or other applicable feature. 1.10 DISRUPTION TO SERVICES/CONTINUED OPERATIONS A. Existing facilities are to continue in service as usual during the construction unless noted otherwise. Owner or utilities must be able to operate and maintain the facilities. Keep disruptions to existing utilities, piping, process piping, or electrical services to a minimum. 1. Do not restrict access to critical valves or operators. 2. Limit operations to the minimum amount of space needed to complete the specified Work. 3. Maintain storm sewers and sanitary sewers in service at all times. Provide temporary service around the construction or otherwise construct the structure in a manner that the flow is not restricted. B. Provide a Plan of Action in accordance with SECTION 0135 00 SPECIAL PROCEDURES if facilities must be taken out of operation. 1.11 FIELD MEASUREMENTS A. Perform complete field measurements prior to purchasing products or beginning construction for products required to fit existing conditions. B. Verify property lines, control lines,grades, and levels indicated on the Drawings. C. Check Shop Drawings and indicate the actual dimensions available where products are to be installed. D. Include field measurements in Record Drawings as required in SECTION 01 31 13 PROJECT COORDINATION. 1.12 REFERENCE DATA AND CONTROL POINTS A. The OPT will provide the following control points: 1. Base line or grid reference points for horizontal control. 2. Benchmarks for vertical control. Project Management and Coordination 013100-4 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 B. Locate and protect control points prior to starting the Work and preserve permanent reference points during construction. Designated control points may be on an existing structure or monument. Do not change or relocate points without prior approval of the OAR. Notify OAR when the reference point is lost, destroyed, or requires relocation. Replace Project control points on the basis of the original survey. C. Provide complete engineering layout of the Work needed for construction. 1. Provide competent personnel. Provide equipment including accurate surveying instruments, stakes, platforms,tools, and materials. 2. Provide surveying with accuracy meeting the requirements established for Category 5 Construction Surveying as established in the Manual of Practice of Land Surveying in Texas published by the Texas Society of Professional Surveyors, latest revision. 3. Record Data and measurements per standards. 1.13 DELIVERY AND STORAGE A. Deliver products and materials to the Site in time to prevent delays in construction. B. Deliver packaged products to Site in original undamaged containers with identifying labels attached. Open cartons as necessary to check for damage and to verify invoices. Reseal cartons and store properly until used. Leave products in packages or other containers until installed. C. Assume full responsibility for the protection and safekeeping of products stored at the Site. D. Store products at locations acceptable to the OAR and to allow Owner access to maintain and operate existing facilities. E. Store products in accordance with the Supplier's storage instructions immediately upon delivery. Leave seals and labels intact. F. Provide additional storage areas as needed for construction. Store products subject to damage by elements in substantial weather-tight enclosures or storage sheds. Provide and maintain storage sheds as required for the protection of products. Provide temperature, humidity control, and ventilation within the ranges stated in the Supplier's instructions. Remove storage facilities at the completion of the Project. G. Protect the pipe interior. Keep all foreign materials such as dirt, debris, animals, or other objects out of the pipe during the Work. Cap or plug ends of installed pipe in an approved manner when pipe is not being installed. Clean or wash out pipe sections that become contaminated before continuing with installation. Take precautions to prevent the pipe from floating or moving out of the proper position during or after laying operations. Immediately correct any pipe that moves from its correct position. H. Provide adequate exterior storage for products that may be stored out-of-doors. 1. Provide substantial platforms, blocking, or skids to support materials and products above ground which has been sloped to provide drainage. Protect products from soiling or staining. Project Management and Coordination 013100-5 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 2. Cover products subject to discoloration or deterioration from exposure to the elements,with impervious sheet materials. Provide ventilation to prevent condensation below covering. 3. Store loose,granular materials on clean, solid surfaces, or on rigid sheet materials, to prevent mixing with foreign matter. 4. Provide surface drainage to prevent erosion and ponding of water. 5. Prevent mixing of refuse or chemically injurious materials or liquids with stored materials. 6. Pipes and conduits stored outdoors are to have open ends sealed to prevent the entrance of dirt, moisture, and other injurious materials. Protect PVC pipe from ultraviolet light exposure. 7. Store light weight products to prevent wind damage. I. Maintain storage facilities. Inspect stored products on a weekly basis and after periods of severe weather to verify that: 1. Storage facilities continue to meet specified requirements; 2. Supplier's required environmental conditions are continually maintained; and 3. Products that can be damaged by exposure to the elements are not adversely affected. J. Replace any stored item damaged by inadequate protection or environmental controls. K. Payment may be withheld for any products not properly stored. 1.14 CLEANING DURING CONSTRUCTION A. Provide positive methods to minimize raising dust from construction operations and provide positive means to prevent air-borne dust from disbursing into the atmosphere. Control dust and dirt from demolition, cutting, and patching operations. B. Clean the Project as Work progresses and dispose of waste materials, keeping the Site free from accumulations of waste or rubbish. Provide containers on Site for waste collection. Do not allow waste materials or debris to blow around or off of the Site. Control dust from waste materials. Transport waste materials with as few handlings as possible. C. Comply with Laws and Regulations. Do not burn or bury waste materials. Remove waste materials, rubbish and debris from the Site and legally dispose of these at public or private disposal facilities. D. Provide a final cleaning to thoroughly clean the entire Site and make ready for acceptance. 1. Remove construction debris, boxes, and trash from the Site. 2. Remove construction storage sheds and field offices. 3. Restore grade to match surrounding condition and remove excess dirt. 4. Sweep all drives and parking lots clean of dirt and debris. Use water trucks or hose down paved site to like new appearance. Project Management and Coordination 013100-6 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 1.15 MAINTENANCE OF ROADS, DRIVEWAYS, AND ACCESS A. Maintain roads and streets in a manner that is suitable for safe operations of public vehicles during all phases of construction unless the Owner approves a street closing. Do not close public roads overnight. B. Submit a Notification by Contractor for Owner's approval of a street closing. The request shall state: 1. The reason for closing the street. 2. How long the street will remain closed. 3. Procedures to be taken to maintain the flow of traffic. C. Construct temporary detours, including by-pass roads around construction, with adequately clear width to maintain the free flow of traffic at all times. Maintain barricades, signs, and safety features around the detour and excavations. Maintain barricades, signs, and safety features around the Work in accordance with all provisions of the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD). D. Assume responsibility for any damage resulting from construction along roads or drives. 1.16 AREA ACCESS AND TRAFFIC CONTROL A. Provide traffic control measures to assure a safe condition and to provide a minimum of inconvenience to motorists and the public. Provide all-weather access to all residents and businesses at all times during construction. Provide temporary driveways and/or roads of approved material during wet weather. Maintain a stockpile of suitable material on the Site to meet the demands of inclement weather. B. Schedule operations to minimize adverse impact on the accessibility of adjoining properties. Sequence construction to build driveways in half widths, construct temporary ramps, or any other measure required to maintain access to adjoining properties. C. Comply with the Owner's Uniform Barricading Standards and Practices. Copies of this document are available through the Owner's Traffic Engineering Department. Secure required permits from the Owner's Traffic Engineering Department. 1.17 OVERHEAD ELECTRICAL WIRES A. Comply with OSHA safety requirements regarding construction equipment working beneath overhead electrical wires. Prevent and pay for repairs for damage to existing overhead electrical wires or facilities. B. Provide for adequate safety with regard to overhead lines whether overhead lines are or are not shown in the Contract Documents. 1.18 BLASTING A. Blasting is not allowed for any purpose. Project Management and Coordination 013100-7 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 1.19 ARCHAEOLOGICAL REQUIREMENTS A. Cease operations immediately and contact the Owner for instructions if historical or archaeological artifacts are found during construction. B. Conduct all construction activities to avoid adverse impact on the Sites where significant historical or archaeological artifacts are found or identified as an area where other artifacts could be found. 1. Obtain details for Working in these areas. 2. Maintain confidentiality regarding the Site. 3. Adhere to the requirements of the Texas Historical Commission. 4. Notify the OAR and the Texas Historical Commission. C. Do not disturb archaeological sites. 1. Obtain the services of a qualified archaeological specialist to instruct construction personnel on how to identify and protect archaeological finds on an emergency basis. 2. Coordinate activities to permit archaeological work to take place within the area. a. Attempt to archaeologically clear areas needed for construction as soon as possible. b. Provide a determination of priority for such areas. D. Assume responsibility for any unauthorized destruction that might result to such Sites by construction personnel, and pay all penalties assessed by the State or Federal agencies for non-compliance with these requirements. E. Contract Times will be modified to compensate for delays caused by such archaeological finds. No additional compensation will be paid for delays. 1.20 ENDANGERED SPECIES RESOURCES A. Do not perform any activity that is likely to jeopardize the continued existence of a threatened or endangered species as listed or proposed for listing under the Federal Endangered Species Act(ESA), and/or the State of Texas Parks and Wildlife Code on Endangered Species, or to destroy or adversely modify the habitat of such species. B. Cease Work immediately in the area of the encounter and notify the OAR if a threatened or endangered species is encountered during construction. OPT will implement actions in accordance with the ESA and applicable State statutes. Resume construction in the area of the encounter when authorized to do so by the OAR. 1.21 COOPERATION WITH PUBLIC AGENCIES A. Cooperate with all public and private agencies with facilities operating within the limits of the Project. B. Provide a 48-hour notice to any applicable agency when work is anticipated to proceed in the vicinity of any facility by using Texas 811 at 811 and the Lone Star Notification Company at 1-800-669-8344. Project Management and Coordination 013100-8 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 C. For the Contractor's convenience, the following telephone numbers are listed: Public Agencies/Contacts Phone Number City Engineer 361-826-3500 Murray F. Hudson, P. E. 361-854-3101 (Urban Engineering) Traffic Engineering 361-826-3547 Police Department 361-882-2600 Water/Wastewater/Stormwater 361-826-1800(361-826-1818 after hours) 361-885-6900(361-885-6942 after Gas Department hours) 361-885-5999 (Dispatch after hours) Parks& Recreation Department 361-826-3461 Street Department 361-826-1875 City Street Div. for Traffic Signals 361-826-1610 Solid Waste& Brush 361-826-1973 MIS Department(City Fiber) 361-826-3740 AEP 1-877-373-4858 AT&T 361-881-2511 (1-800-824-4424 after hours) Grande Communications 254-379-4400 Time Warner Communications Crown Castle Communications 1-888-632-0931 Century Tel 361-883-3000 Windstream Regional Transportation Authority 361-289-2712 Port of Corpus Christi Authority Engr. 361-882-5633 TxDOT Area Office 361-808-2500 Corpus Christi ISD 361-886-9005 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Project Management and Coordination 013100-9 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 01 31 13 PROJECT COORDINATION 1.00 GENERAL 1.01 WORK INCLUDED A. Administer Contract requirements to construct the Project. Provide documentation per the requirements of this Section. Provide information as requested by the OPT. 1.02 DOCUMENT SUBMITTAL A. Provide documents in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT. B. Use the forms provided for Contract administration, applications for payment, document submittals, documentation of test results, equipment installation and documentation, and Project closeout. A digital copy of the required forms will be provided to the Contractor before or at the pre-construction conference. 1.03 COMMUNICATION DURING THE PROJECT A. The OAR is to be the first point of contact for all parties on matters concerning this Project. B. The Designer will coordinate correspondence concerning: 1. Documents, including Applications for Payment. 2. Clarification and interpretation of the Contract Documents. 3. Contract Modifications. 4. Observation of Work and testing. 5. Claims. C. The OAR will normally communicate only with the Contractor. Any required communication with Subcontractors or Suppliers will only be with the direct involvement of the Contractor. D. Direct written communications to the OAR at the address indicated at the pre-construction conference. Include the following with communications as a minimum: 1. Name of the Owner. 2. Project name. 3. Contract title. 4. Project number. 5. Date. 6. A reference statement. E. Submit communications on the forms referenced in this Section or in SECTION 0133 00 DOCUMENT MANAGEMENT. Project Coordination 013113- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 1.04 PROJECT MEETINGS A. Pre-Construction Conference: 1. Attend a pre-construction conference. 2. The location of the conference will be determined by the OAR. 3. The time of the meeting will be determined by the OAR but will be after the Notice of Award is issued and not later than 15 days after the Notice to Proceed is issued. 4. The OPT, Contractor's project manager and superintendent, representatives of utility companies, and representatives from major Subcontractors and Suppliers may attend the conference. 5. Provide and be prepared to discuss: a. Preliminary construction schedule per SECTION 0133 04 CONSTRUCTION PROGRESS SCHEDULE. b. Schedule of Values and anticipated Schedule of Payments per SECTION 0129 00 APPLICATION FOR PAYMENT PROCEDURES. C. List of Subcontractors and Suppliers. d. Contractor's organizational chart as it relates to this Project. e. Letter indicating the agents of authority for the Contractor and the limit of that authority with respect to the execution of legal documents, Contract Modifications, and payment requests. B. Progress Meetings: 1. Attend meetings with the OAR and Owner. a. Meet on a monthly basis or as requested by the OAR to discuss the Project. b. Meet at the Site or other location as designated by the OAR. C. Contractor's superintendent and other key personnel are to attend the meeting. Other individuals may be requested to attend to discuss specific matters. d. Notify the OAR of any specific items to be discussed a minimum of 1 week prior to the meeting. 2. Provide information as requested by the OAR or Owner concerning this Project. Prepare to discuss: a. Status of overall Project schedule. b. Contractor's detailed schedule for the next month. C. Anticipated delivery dates for equipment. d. Coordination with the Owner. e. Status of documents. f. Information or clarification of the Contract Documents. g. Claims and proposed Modifications to the Contract. Project Coordination 013113-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 h. Field observations, problems, or conflicts. i. Maintenance of quality standards. 3. OAR will prepare minutes of meetings. Review the minutes of the meeting and notify the OAR of any discrepancies within 10 days of the date of the meeting memorandum. The minutes will not be corrected after the 10 days have expired. Corrections will be reflected in the minutes of the following meeting or as an attachment to the minutes. C. Pre-Submittal and Pre-Installation Meetings: 1. Conduct pre-submittal and pre-installation meetings as required in the individual technical Specifications or as determined necessary by the OAR (for example, instrumentation, roofing, concrete mix design, etc.). 2. Set the time and location of the meetings when ready to proceed with the associated Work. Submit a Notification by Contractor in accordance with Paragraph 1.07 for the meeting 2 weeks before the meeting. OPT must approve of the proposed time and location. 3. Attend the meeting and require the participation of appropriate Subcontractors and Suppliers in the meeting. 4. Prepare minutes of the meeting and submit to the OPT for review. OPT will review the minutes of the meeting and notify the Contractor of any discrepancies within 10 days of the date of the meeting memorandum. The minutes will not be corrected after the 10 days have expired. Corrections will be reflected in a revised set of meeting minutes. 1.05 REQUESTS FOR INFORMATION A. Submit Request for Information (RFI) to the Designer to obtain additional information or clarification of the Contract Documents. 1. Submit a separate RFI for each item on the form provided. 2. Attach adequate information to permit a written response without further clarification. Designer will return requests that do not have adequate information to the Contractor for additional information. Contractor is responsible for all delays resulting from multiple document submittals due to inadequate information. 3. A response will be made when adequate information is provided. Response will be made on the RFI form or in attached information. B. Response to an RFI is given to provide additional information, interpretation, or clarification of the requirements of the Contract Documents, and does not modify the Contract Documents. C. Designer will initiate a Request for a Change Proposal (RCP) per SECTION 01 31 14 CHANGE MANAGEMENT if the RFI indicates that a Contract Modification is required. D. Use the Project Issues Log to document decisions made at meetings and actions to be taken in accordance with Paragraph 1.06. E. Use the Action Item Log to document assignments for actions to be taken in accordance with Paragraph 1.06. Project Coordination 013113-3 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 1.06 DECISION AND ACTION ITEM LOG A. OAR will maintain a Project Decision Log to document key decisions made at meetings, telephone conversation or Site visits using the format provided: 1. Review the log prior to each regular meeting. 2. Report any discrepancies to the OAR for correction or discussion at the next monthly meeting. B. OAR will maintain an Action Item log in conjunction with the Project Decision Log to track assignments made at meetings, telephone conversation, or Site visits using the format provided: 1. Review the Action Item Log prior to each regular meeting. 2. Report actions taken subsequent to the previous progress meeting on items in the log assigned to the Contractor or through the Contractor to a Subcontractor or Supplier to the OAR. Report on status of progress 1 week prior to each progress meeting established in Paragraph 1.04 to allow OAR to update the log prior to the Progress meetings. 3. Be prepared to discuss the status at each meeting. C. Decisions or action items in the log that require a change in the Contract Documents will have the preparation of a Modification as an action items if appropriate. The Contract Documents can only be changed by a Modification. 1.07 NOTIFICATION BY CONTRACTOR A. Notify the OAR of: 1. Need for testing. 2. Intent to work outside regular working hours. 3. Request to shut down facilities or utilities. 4. Proposed utility connections. 5. Required observation by OAR, Designer, or inspection agencies prior to covering Work. 6. Training. B. Provide notification a minimum of 2 weeks in advance in order to allow OPT time to respond appropriately to the notification. C. Use "Notification by Contractor" form provided. 1.08 RECORD DOCUMENTS A. Maintain at the Site one complete set of printed Record Documents including: 1. Drawings. 2. Specifications. 3. Addenda. 4. Modifications. Project Coordination 013113-4 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 5. Record Data and approved Shop Drawings. 6. Construction photographs. 7. Test Reports. 8. Clarifications and other information provided in Request for Information responses. 9. Reference standards. B. Store printed Record Documents and Samples in the Contractor's field office. 1. Record Documents are to remain separate from documents used for construction. 2. Provide files and racks for the storage of Record Documents. 3. Provide a secure storage space for the storage of Samples. 4. Maintain Record Documents in clean, dry, legible conditions, and in good order. 5. Make Record Documents and Samples available at all times for inspection by the OPT. C. Maintain a digital record of Specifications and Addenda to identify products provided in PDF format. 1. Reference the Record Data number, Shop Drawings number, and O&M manual number for each product and item of equipment furnished or installed. 2. Reference Modifications by type and number for all changes. D. Maintain a digital record of Drawings in PDF format. 1. Reference the Record Data number, Shop Drawings number, and O&M manual number for each product and item of equipment furnished or installed. 2. Reference Modifications by type and number for all changes. 3. Record information as construction is being performed. Do not conceal any Work until the required information is recorded. 4. Mark Drawings to record actual construction, including the following: a. Depths of various elements of the foundation in relation to finished first floor datum or the top of walls. b. Horizontal and vertical locations of underground utilities and appurtenances constructed and existing utilities encountered during construction. C. Location of utilities and appurtenances concealed in the Work. Refer measurements to permanent structures on the surface. Include the following equipment: 1) Piping. 2) Ductwork. 3) Equipment and control devices requiring periodic maintenance or repair. 4) Valves, unions, traps, and tanks. 5) Services entrance. 6) Feeders. Project Coordination 013113-5 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 7) Outlets. d. Changes of dimension and detail. e. Changes by Modifications. f. Information in Request for Information or included in the Project Issues Log. g. Details not on the original Drawings. Include field verified dimensions and clarifications, interpretations, and additional information issued in response to RFIs. 5. Mark Drawings with the following colors: a. Highlight references to other documents, including Modifications in blue; b. Highlight mark ups for new or revised Work(lines added) in yellow; C. Highlight items deleted or not installed (lines to be removed) in red; and d. Highlight items constructed per the Contract Documents in green. 6. Submit Record Documents to Designer for review and acceptance 30 days prior to Final Completion of the Project. E. Applications for Payment will not be recommended for payment if Record Documents are found to be incomplete or not in order. Final payment will not be recommended without complete Record Documents. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Project Coordination 013113-6 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 01 31 14 CHANGE MANAGEMENT 1.00 GENERAL 1.01 REQUESTS FOR CHANGE PROPOSAL A. Designer will initiate Modifications by issuing a Request for a Change Proposal (RCP). 1. Designer will prepare a description of proposed Modifications. 2. Designer will issue the Request for a Change Proposal form to Contractor. A number will be assigned to the Request for a Change Proposal when issued. 3. Return a Change Proposal in accordance with Paragraph 1.02 to the Designer for evaluation by the OPT. 1.02 CHANGE PROPOSALS A. Submit a Change Proposal (CP)to the Designer for Contractor initiated changes in the Contract Documents or in response to a Request for Change Proposal. 1. Use the Change Proposal form provided. 2. Assign a number to the Change Proposal when issued. 3. Include with the Change Proposal: a. A complete description of the proposed Modification if Contractor initiated or proposed changes to the OPT's description of the proposed Modification. b. The reason the Modification is requested, if not in response to a Request for a Change Proposal. C. A detailed breakdown of the cost of the change if the Modification requires a change in Contract Price. The itemized breakdown is to include: 1) List of materials and equipment to be installed; 2) Man hours for labor by classification; 3) Equipment used in construction; 4) Consumable supplies, fuels, and materials; 5) Royalties and patent fees; 6) Bonds and insurance; 7) Overhead and profit; 8) Field office costs; 9) Home office cost; and 10) Other items of cost. d. Provide the level of detail outline in the paragraph above for each Subcontractor or Supplier actually performing the Work if Work is to be provided by a Subcontractor or Supplier. Indicate appropriate Contractor mark-ups for Work Change Management 013114- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 provided through Subcontractors and Suppliers. Provide the level of detail outline in the paragraph above for self-performed Work. e. Submit Change Proposals that comply with Article 13 of the General Conditions for Cost of Work. f. Provide a revised schedule. Show the effect of the change on the Project Schedule and the Contract Times. B. Submit a Change Proposal to the Designer to request a Field Order. C. A Change Proposal is required for all substitutions or deviations from the Contract Documents. D. Request changes to products in accordance with SECTION 0133 02 SHOP DRAWINGS. 1.03 DESIGNER WILL EVALUATE THE REQUEST FOR A MODIFICATION. A. Designer will issue a Modification per the General Conditions if the Change Proposal is acceptable to the Owner. Designer will issue a Change Order or Contract Amendment for any changes in Contract Price or Contract Times. 1. Change Orders and Contract Amendments will be sent to the Contractor for execution with a copy to the Owner recommending approval. A Work Change Directive may be issued if Work needs to progress before the Change Order or Contract Amendment can be authorized by the Owner. 2. Work Change Directives, Change Orders, and Contract Amendments can only be approved by the Owner. a. Work performed on the Change Proposal prior to receiving a Work Change Directive or approval of the Change Order or Contract Amendment is performed at the Contractor's risk. b. No payment will be made for Work on Change Orders or Contract Amendments until approved by the Owner. B. The Contractor may be informed that the Request for a Change Proposal is not approved and construction is to proceed in accordance with the Contract Documents. 1.04 EQUAL NON SPECIFIED PRODUCTS A. The products of the listed Suppliers are to be furnished where Specifications list several manufacturers but do not specifically list "or equal" or"or approved equal" products. Use of any products other than those specifically listed is a substitution. Follow the procedures in Paragraph 1.05 for a substitution. B. Contractor may submit other manufacturers' products that are in full compliance with the Specification where Specifications list one or more manufacturers followed by the phase "or equal" or"or approved equal." 1. Submit a Shop Drawing as required by SECTION 0133 02 SHOP DRAWINGS to document that the proposed product is equal or superior to the specified product. 2. Prove that the product is equal. It is not the OPT's responsibility to prove the product is not equal. Change Management 013114-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 a. Indicate on a point by point basis for each specified feature that the product is equal to the Contract Document requirements. b. Make a direct comparison with the specified manufacturer's published data sheets and available information. Provide this printed material with the Shop Drawing. C. The decision of the Designer regarding the acceptability of the proposed product is final. 3. Provide a typewritten certification that, in furnishing the proposed product as an equal, the Contractor: a. Has thoroughly examined the proposed product and has determined that it is equal or superior in all respects to the product specified. b. Has determined that the product will perform in the same manner and result in the same process as the specified product. C. Will provide the same warranties and/or bonds as for the product specified. d. Will assume all responsibility to coordinate any modifications that may be necessary to incorporate the product into the construction and will waive all claims for additional Work which may be necessary to incorporate the product into the Project which may subsequently become apparent. e. Will maintain the same time schedule as for the specified product. 4. A Change Proposal is not required for any product that is in full compliance with the Contract Documents. If the product is not in full compliance, it may be offered as a Substitution. 1.05 SUBSTITUTIONS A. Substitutions are defined as any product that the Contractor proposes to provide for the Project in lieu of the specified product. Submit a Change Proposal per Paragraph 1.02 along with a Shop Drawing as required by SECTION 0133 02 SHOP DRAWINGS to request approval of a substitution. B. Prove that the product is acceptable as a substitute. It is not the Designer's responsibility to prove the product is not acceptable as a substitute. 1. Indicate on a point by point basis for each specified feature that the product is acceptable to meet the intent of the Contract Documents requirements. 2. Make a direct comparison with the specified Suppliers published data sheets and available information. Provide this printed material with the documents submitted. 3. The decision of the Designer regarding the acceptability of the proposed substitute product is final. C. Provide a written certification that, in making the substitution request, the Contractor: 1. Has determined that the substituted product will perform in substantially the same manner and result in the same ability to meet the specified performance as the specified product. Change Management 013114-3 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 2. Will provide the same warranties and/or bonds for the substituted product as specified or as would be provided by the manufacturer of the specified product. 3. Will assume all responsibility to coordinate any modifications that may be necessary to incorporate the substituted product into the Project and will waive all claims for additional Work which may be necessary to incorporate the substituted product into the Project which may subsequently become apparent. 4. Will maintain the same time schedule as for the specified product. D. Pay for review of substitutions in accordance with SECTION 0133 02 SHOP DRAWINGS. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Change Management 013114-4 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 01 33 00 DOCUMENT MANAGEMENT 1.00 GENERAL 1.01 WORK INCLUDED A. Submit documentation as required by the Contract Documents and as reasonably requested by the OPT. 1.02 QUALITY ASSURANCE A. Submit legible, accurate, complete documents presented in a clear, easily understood manner. Documents not meeting these criteria will be returned without review. 1.03 CONTRACTOR'S RESPONSIBILITIES A. Review documents prior to submitting. Make certifications as required by the Contract Documents and as indicated on forms provided. B. Provide a Schedule of Documents to list the documents that are to be submitted,the dates on which documents are to be sent to the Designer for review, and proposed dates that documents must be returned to comply with the Project schedule. Use the form provided for this list. C. Incorporate the dates for processing documents into the Progress Schedule required by SECTION 0133 04 CONSTRUCTION PROGRESS SCHEDULE. 1. Provide documents in accordance with the schedule so construction of the Project is not delayed. 2. Allow a reasonable time for the review of documents when preparing the Progress Schedule. Assume a 14 day review cycle for each document unless a longer period of time is indicated in the Contract Documents or agreed to by Designer and Contractor. 3. Schedule submittal of documents to provide all information for interrelated Work at one time. 4. Allow adequate time for processing documents so construction of the Project is not delayed. 1.04 DOCUMENT SUBMITTAL PROCEDURES A. Submit documents through the Designer. Send all documents in digital format for processing. 1. Provide all information requested with a completed Document Transmittal form. Do not leave any blanks incomplete. If information is not applicable, enter NA in the space provided. 2. The Document Transmittal form is to be the first page in the document submitted. 3. Submit all documents in Portable Document Format(PDF). Document Management 013300- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 a. Create PDF document using Bluebeam Revu software or other compatible software that will create files that can be opened and annotated using Bluebeam Revu software. b. Create PDF documents from native format files unless files are only available from scanned documents. C. Rotate pages so that the top of each document appears at the top of the monitor screen when opened in PDF viewing software. d. Submit PDF document with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. e. Submit color PDF documents where color is required to interpret the document. f. Create or convert documents to allow text to be selected for comments or searched using text search features. Run scanned documents through Optical Character Recognition (OCR) software if necessary. g. Flatten markups in documents to prevent markups made by Contractor from being moved or deleted. Flatten documents to allow markup recovery. h. Use Bluebeam Revu software to reduce file size using default settings except the option for"Drop Metadata." Uncheck the "Drop Metadata" box when reducing file size i. Add footers to each document with the Project name. 1.05 DOCUMENT NUMBERING A. Assign a number to the documents originated to allow tracking of the documents during the review process. 1. Assign the number consisting of a prefix, a sequence number, and a letter suffix. Prefixes shall be as follows: Prefix Description Originator AP Application for Payment Contractor CO Change Order OAR CP Change Proposal Contractor CTR Certified Test Report Contractor FO Field Order OAR NBC Notification by Contractor Contractor PD Photographic Documentation Contractor RCP Request for a Change Proposal OAR RD Record Data Contractor RFI Request for Information Contractor SD Shop Drawing Contractor Document Management 013300-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 Prefix Description Originator SCH Schedule of Progress Contractor 2. Issue sequence numbers in chronological order for each type of document. 3. Issue numbers for resubmittals that have the same number as the original document followed by an alphabetical suffix indicating the number of times the same document has been sent to the Designer for processing. For example: SD 025 A represents Shop Drawing number 25 and the letter"A" designates that this is the second time this document has been sent for review. 4. Clearly note the document number on each page or sheet of the document. 5. Correct assignment of numbers is essential since different document types are processed in different ways. B. Include reference the Drawing number and/or Specification Section, detail designation, schedule, or location that corresponds with the data on the document transmittal forms. Other identification may also be required, such as layout drawings or schedules to allow the reviewer to determine where a particular product is to be used. 1.06 DOCUMENT REQUIREMENTS A. Furnish documents as indicated below or in individual Specification Sections. Submit documents per the procedures described in the Contract Documents. B. Submit documents per the Specification Section shown in the following table: Document Type Specification Section Application for Payment 01 29 00 Change Proposal 01 31 14 0133 02 for approval of product Certified Test Report 0140 00 to demonstrate compliance Notification by Contractor 01 31 13 Photographic Documentation 01 33 05 Progress Schedules 01 33 04 Record Data 01 33 03 Request for Information 01 31 13 Shop Drawing 01 33 02 Schedule of Values 01 29 00 Substitutions 01 31 14 Suppliers and Subcontractors 01 31 13 and 0133 03 Document Management 013300-3 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Document Management 013300-4 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 0133 01 Submittal Register 026210 Polyvinyl Chloride Pipe and Fittings for Water VARIOUS ✓ 026206 Ductile Iron Pipe and Fittings(Water Lines) VARIOUS ✓ 026411 Gate Valves for Waterlines VARIOUS ✓ 026416 Fire Hydrant VARIOUS ✓ 025412 Prime Coat VARIOUS ✓ 025424 Hot Mix Asphalt Concrete Pavement VARIOUS ✓ 025620 Concrete Pavement VARIOUS ✓ 025807 Pavement Marking VARIOUS ✓ 320020 Normal Weight Concrete VARIOUS ✓ 320020 High Early Strength Concrete VARIOUS ✓ 321216.27 Fiber Reinforced Asphalt Paving VARIOUS ✓ 032020 Reinforcing Steel VARIOUS ✓ 027202 Storm Sewer Manholes VARIOUS ✓ 028020 Hydromulch Seeding VARIOUS ✓ 25424 Flexible Base VARIOUS ✓ Submittal Register 01 33 01-1 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 07-03-2014 01 33 02 SHOP DRAWINGS 1.00 GENERAL 1.01 WORK INCLUDED A. Shop Drawings are required for those products that cannot adequately be described in the Contract Documents to allow fabrication, erection, or installation of the product without additional detailed information from the Supplier. B. Submit Shop Drawings as required by the Contract Documents and as reasonably requested by the OPT to: 1. Record the products incorporated into the Project for the Owner; 2. Provide detailed information for the products proposed for the Project regarding their fabrication, installation, commissioning, and testing; and 3. Allow the Designer to advise the Owner if products proposed for the Project by the Contractor conform, in general, to the design concepts of the Contract Documents. C. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the review of Shop Drawings, Samples, or mockups. Contract modifications can only be approved by Change Order or Field Order. 1.02 QUALITY ASSURANCE A. Submit legible, accurate, and complete documents presented in a clear, easily understood manner. Shop Drawings not meeting these criteria will be rejected. B. Demonstrate that the proposed products are in full and complete compliance with the design criteria and requirements of the Contract Documents, or will be if deviations requested per Paragraph 1.10 are approved. C. Furnish and install products that fully comply with the information included in the document submittal. 1.03 CONTRACTOR'S RESPONSIBILITIES A. Provide Shop Drawings for the following items: Specification Section Shop Drawing Description B. Include Shop Drawings in the Schedule of Documents required by SECTION 0133 00 DOCUMENT MANAGEMENT to indicate the Shop Drawings to be submitted, the dates on which documents are to be sent to the Designer for review and proposed dates that the product will be incorporated into the Project. C. Incorporate the dates for processing Shop Drawings into the Progress Schedule required by SECTION 0133 04 CONSTRUCTION PROGRESS SCHEDULE. Shop Drawings 013302- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 1. Submit Shop Drawings in accordance with the schedule so construction of the Project is not delayed. 2. Allow a reasonable time for the review of Shop Drawings when preparing the Progress Schedule. Include time for making revisions to the Shop Drawings and resubmitting the Shop Drawing for a least a second review. Assume a 14 day review cycle for each time a Shop Drawing is submitted for review unless a longer period of time is indicated in the Contract Documents. 3. Schedule document submittals to provide all information for interrelated Work at one time. 4. Allow adequate time for ordering, fabricating, delivering, and installing product so construction of the Project is not delayed. D. Complete the following before submitting a Shop Drawing or Sample: 1. Prepare Shop Drawing Review and coordinate the Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents; 2. Determine and verify specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information with respect to Shop Drawings and Samples; 3. Determine and verify the suitability of materials and equipment offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and 4. Determine and verify information relative to Contractor's responsibilities for means, methods,techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto. E. Determine and verify: 1. Accurate field measurements, quantities, and dimensions are shown on the Shop Drawing; 2. Location of existing structures, utilities, and equipment related to the Shop Drawing have been shown and conflicts between the products existing structures, utilities, and equipment have been identified; 3. Conflicts that impact the installation of the products have been brought to the attention of the OPT through the Designer; 4. Shop Drawing are complete for their intended purpose; and 5. Conflicts between the Shop Drawing related to the various Subcontractors and Suppliers have been resolved. F. Review Shop Drawings prior to submitting to the Designer. Certify that all Shop Drawings have been reviewed by the Contractor and are in strict conformance with the Contract Documents as modified by Addenda, Change Order, Field Order, or Contract Amendment when submitting Shop Drawings except for deviations specifically brought to the Designer's attention on an attached Shop Drawing Deviation Request form in accordance with Paragraph 1.10. Shop Drawings 013302-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 G. Fabrication or installation of any products prior to the approval of Shop Drawings is done at the Contractor's risk. Defective products may be rejected at the Owner's option. H. Payment will not be made for products for which Shop Drawings or Samples are required until these are approved by the Designer. 1.04 SHOP DRAWING REQUIREMENTS A. Provide adequate information in Shop Drawings and Samples so Designer can: 1. Assist the Owner in selecting colors, textures, or other aesthetic features. 2. Compare the proposed features of the product with the specified features and advise Owner that the product does, in general, conform to the Contract Documents. 3. Compare the performance features of the proposed product with those specified and advise the Owner that the product does, in general, conform to the performance criteria specified in the Contract Documents. 4. Review required certifications, guarantees,warranties, and service agreements for compliance with the Contract Documents. B. Include a complete description of the product to be furnished, including: 1. Type, dimensions, size, arrangement, and operational characteristics of the product; 2. Weights, gauges, materials of construction, external connections, anchors, and supports required; 3. All applicable standards such as ASTM or Federal specification numbers; 4. Fabrication and installation drawings, setting diagrams, manufacturing instructions, templates, patterns, and coordination drawings; 5. Mix designs for concrete, asphalt, or other materials proportioned for the Project; and 6. Complete and accurate field measurements for products which must fit existing conditions. Indicate on the document submittal that the measurements represent actual dimensions obtained at the Site. C. Submit Shop Drawings that require coordination with other Shop Drawings at the same time. Shop Drawings requiring coordination with other Shop Drawings will be rejected until a complete package is submitted. 1.05 SPECIAL CERTIFICATIONS AND REPORTS A. Provide all required certifications with the Shop Drawings as specified in the individual Specification Sections: 1. Certified Test Reports (CTR): A report prepared by an approved testing agency giving results of tests performed on products to indicate their compliance with the Specifications. This report is to demonstrate that the product when installed will meet the requirements and is part of the Shop Drawing. Field tests may be performed by the Owner to determine that in place materials or products meet the same quality as indicated in the CTR submitted as part of the Shop Drawing. Shop Drawings 013302-3 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 2. Certification of Local Field Service (CLS): A certified letter stating that field service is available from a factory or supplier approved service organization located within a 300 mile radius of the Site. List names, addresses, and telephone numbers of approved service organizations on or attach it to the certificate. 3. Certification of Adequacy of Design (CAD): A certified letter from the manufacturer of the equipment stating that they have designed the equipment to be structurally stable and to withstand all imposed loads without deformation, failure, or adverse effects to the performance and operational requirements of the unit. The letter shall state that mechanical and electrical equipment is adequately sized to be fully operational for the conditions specified or normally encountered by the product's intended use. 1.06 WARRANTIES AND GUARANTEES A. Provide all required warranties, guarantees, and related documents with the Shop Drawing. The effective date of warranties and guarantees will be the date of acceptance of the Work by the Owner. B. Identify all Extended Warranties, defined as any guarantee of performance for the product or system beyond the 1 year correction period described in the General Conditions. Issue the warranty certificate in the name of the Owner. Provide a Warranty Bond for Extended Warranties if required by Specification Sections. C. Provide a copy of all warranties in a separate document in accordance with SECTION 0170 00 EXECUTION AND CLOSEOUT REQUIREMENTS. 1.07 SHOP DRAWING SUBMITTAL PROCEDURES A. Submit Shop Drawings through the Designer. Send all documents in digital format for processing. 1. Provide all information requested in the Shop Drawing submittal form. Do not leave any blanks incomplete. If information is not applicable, enter NA in the space provided. The Shop Drawing submittal form is to be the first document in the file submitted. 2. Submit all documents in Portable Document Format (PDF). a. Create PDF document using Bluebeam Revu software or other compatible software that will create files that can be opened and annotated using Bluebeam Revu software. b. Create PDF documents from native format files unless files are only available from scanned documents. C. Rotate pages so that the top of each document appears at the top of the monitor screen when opened in PDF viewing software. d. Submit PDF document with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. e. Submit color PDF documents where color is required to interpret the Shop Drawing. Submit Samples and color charts per Paragraph 1.08.A. Shop Drawings 013302-4 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 f. Create or convert documents to allow text to be selected for comments or searched using text search features. Run scanned documents through Optical Character Recognition (OCR) software if necessary. g. Flatten markups in documents to prevent markups made by Contractor from being moved or deleted. Flatten documents to allow markup recovery. h. Use Bluebeam Revu software to reduce file size using default settings except the option for"Drop Metadata." Uncheck the "Drop Metadata" box when reducing file size. i. Add footers to each document with the Project name. 3. Submit each specific product or class of material separately so these can be tracked and processed independently. Do not submit Shop Drawings for more than one product in the same Shop Drawing. 4. Submit items specified in different Specification Sections separately unless they are part of an integrated system. 5. Define abbreviations and symbols used in Shop Drawings. a. Use terms and symbols in Shop Drawings consistent with the Contract Drawings. b. Provide a list of abbreviations and their meaning as used in the Shop Drawings. C. Provide a legend for symbols used on Shop Drawings. 6. Mark Shop Drawings to reference: a. Related Specification Sections, b. Drawing number and detail designation, C. Product designation or name, d. Schedule references, e. System into which the product is incorporated, and f. Location where the product is incorporated into the Project. B. Use the following conventions to markup Shop Drawings for review: 1. Make comments and corrections in the color blue. Add explanatory comments to the markup. 2. Highlight items in black that are not being furnished when the Supplier's standard drawings or information sheets are provided so that only the products to be provided are in their original color. 3. Make comments in the color yellow where selections or decisions by the Designer are required, but such selections do not constitute a deviation from the Contract Documents. Add explanatory comments to the markup to indicate the action to be taken by the Designer. 4. Make comments in the color orange that are deviation requests. Include the deviation request number on the Shop Drawing that corresponds to the deviation request on Shop Drawings 013302-5 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 the Shop Drawing Deviation Request form. Include explanatory comments in the Shop Drawing Deviation Request form. 5. Mark dimensions with the prefix FD to indicate field verified dimensions on the Shop Drawings. C. Submit a Change Proposal per SECTION 01 31 14 CHANGE MANAGEMENT to request modifications to the Contract Documents, including those for approval of"or equal" products when specifically allowed by the Contract Documents or as a substitution for specified products or procedures. D. Designate a Shop Drawing as requiring priority treatment in the comment section of the Shop Drawing submittal form to place the review of the Shop Drawing ahead of other Shop Drawings previously delivered. Shop Drawings are typically reviewed in the order received, unless Contractor requests that a different priority be assigned. Priority Shop Drawings will be reviewed before other Shop Drawings for this Project already received but not yet reviewed. Use of this priority designation for Shop Drawings may delay the review of Shop Drawings previously submitted, pushing the processing of Shop Drawings beyond the 14 day target. Contractor is responsible for delays resulting from the use of the priority designation status on Shop Drawings. E. Complete the certification required by Paragraph 1.03. 1.08 SAMPLE AND MOCKUP SUBMITTAL PROCEDURES A. Submit color charts and Samples for every product requiring color, texture, or finish selection. 1. Submit color charts and Samples only after Shop Drawings for the products have been approved. 2. Deliver all color charts and Samples at one time. 3. Provide Samples of adequate size to clearly illustrate the functional characteristics of the product, with integrally related parts and attachment devices. 4. Indicate the full range of color, texture, and patterns. 5. Deliver color charts and Samples to the field office and store for the duration of the Project 6. Notify the Designer that color charts and Samples have been delivered for approval using the Notification by Contractor form. 7. Submit color charts and Samples not less than 30 days prior to when these products are to be ordered or released for fabrication to comply with the Project schedule. 8. Remove Samples that have been rejected. Submit new Samples following the same process as for the initial Sample until Samples are approved. 9. Dispose of Samples when related Work has been completed and approved and disposal is approved by the Designer. At Owner's option, Samples will become the property of the Owner. B. Construct mockups for comparison with the Work being performed. Shop Drawings 013302-6 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 1. Construct mockups from the actual products to be used in construction per detailed Specification Sections. 2. Construct mockups of the size and in the area indicated in the Contract Documents. 3. Construct mockups complete with texture and finish to represent the finished product. 4. Notify the Designer that mockups have been constructed and are ready for approval using the Notification by Contractor form. Allow 2 weeks for OPT to approve of the mockup before beginning the Work represented by the mockup. 5. Remove mockups that have been rejected. Construct new mockups following the same process as for the initial mockup until mockup is approved. 6. Protect mockups until Work has been completed and accepted by the OPT. 7. Dispose of mockups when related Work has been completed and disposal is approved by the Designer. 1.09 REQUESTS FOR DEVIATION A. Submit requests for deviation from the Contract Documents for any product that does not fully comply with the Contract Documents. B. Submit requests for deviation using the Shop Drawing Deviation Request form provided. Identify each deviation request as a separate item. Include all requested deviations that must be approved as a group together and identify them as a single item. C. Include a description of why the deviation is required and the impact on Contract Price or Contract Times. Include the amount of any cost savings to the Owner for deviations that result in a reduction in cost. D. Submit as a Change Proposal prior to submitting the Shop Drawing if the deviation will result in a change in Contract Price or Contract Times. E. A Modification must be issued by the Designer for approval of a deviation. Approval of a requested Shop Drawing deviation by the Designer on the Shop Drawings Deviation Request form indicates approval of the requested deviation only on its technical merits as generally conforming to the Contract Documents. Deviations from the Contract Documents can only be approved by a Modification. 1.10 DESIGNER RESPONSIBILITIES A. Shop Drawings will be received by the Designer. Designer will log the documents and review per this Section for general conformance with the Contract Documents. 1. Designer's review and approval will be only to determine if the products described in the Shop Drawing or Sample will, after installation or incorporation into the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. Designer's review and approval will not extend to means, methods,techniques, sequences, or procedures of construction or to safety precautions or programs incident thereto. Shop Drawings 013302-7 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 3. Designer's review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. B. Comments will be made on items called to the attention of the Designer for review and comment. Any marks made by the Designer do not constitute a blanket review of the document submittal or relieve the Contractor from responsibility for errors or deviations from the Contract requirements. 1. Designer will respond to Contractor's markups by either making markups directly in the Shop Drawings file using the color green or by attaching a Document Review Comments form with review comments. 2. Shop Drawings that are reviewed will be returned with one or more of the following status designations: a. Approved: Shop Drawing is found to be acceptable as submitted. b. Approved as Noted: Shop Drawing is Approved so long as corrections or notations made by Designer are incorporated into the Show Drawing. C. Not Approved: Shop Drawing or products described are not acceptable. 3. Shop Drawing will also be designated for one of the following actions: a. Final distribution: Shop Drawing is acceptable without further action and has been filed as a record document. b. Shop Drawing not required: A Shop Drawing was not required by the Contract Documents. Resubmit the document per SECTION 0133 03 RECORD DATA. C. Cancelled: This action indicates that for some reason, the Shop Drawing is to be removed from consideration and all efforts regarding the processing of that document are to cease. d. Revise and resubmit: Shop Drawing has deviations from the Contract Documents, significant errors, or is inadequate and must be revised and resubmitted for subsequent review. e. Resubmit with corrections made: Shop Drawing is "Approved as Noted," but has significant markups. Make correction and notations to provide a revised document with markup incorporated into the original document so that no markups are required. f. Returned without review due to excessive deficiencies: Document does not meet the requirement of the Specifications for presentation or content to the point where continuing to review the document would be counterproductive to the review process or clearly does not meet the requirements of the Contract Documents. Revise the Shop Drawing to comply with the requirements of this Section and resubmit. g. Actions a through c will close out the Shop Drawing review process and no further action is required as a Shop Drawing. Actions d through f require follow up action to close out the review process. 4. Drawings with a significant or substantial number of markings by the Contractor may be marked "Approved as Noted" and "Resubmit with corrections made." These Shop Drawings 013302-8 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 drawings are to be revised to provide a clean record of the Shop Drawing. Proceed with ordering products as the documents are revised. 5. Dimensions or other data that does not appear to conform to the Contract Documents will be marked as "At Variance With" (AVW)the Contract Documents or other information provided. The Contractor is to make revisions as appropriate to comply with the Contract Documents. C. Bring deviations to the Shop Drawings to the attention of the Designer for approval by using the Shop Drawing Deviation Request form. Use a single line for each requested deviation so the Status and Action for each deviation can be determined for that requested deviation. If approval or rejection of a requested deviation will impact other requested deviations, then all related deviations should be included in that requested deviation line so the status and action can be determined on the requested deviation as a whole. D. Requested deviations will be reviewed as possible Modification to the Contract Documents. 1. A Requested deviation will be rejected as "Not Approved" if the requested deviation is unacceptable. Contractor is to revise and resubmit the Shop Drawing with corrections for approval. 2. A Field Order will be issued by the Designer for deviations approved by the Designer if the requested deviation is acceptable and if the requested deviation will not result in a change in Contract Price or Contract Times. Requested deviations from the Contract Documents may only be approved by Field Order. 3. A requested deviation will be rejected if the requested deviation is acceptable but the requested deviation will or should result in a change in Contract Price or Contract Times. Submit any requested deviation that requires as change in Contract Price or Contract Times as a Change Proposal for approval prior to resubmitting the Shop Drawing. E. Contractor is to resubmit the Shop Drawing until it is acceptable and marked Approved or Approved as Noted and is assigned an action per Paragraph 1.10.13 that indicates that the Shop Drawing process is closed. F. Information that is submitted as a Shop Drawings that should be submitted as Record Data or other type of document, or is not required may be returned without review, or may be deleted. No further action is required and the Shop Drawing process for this document will be closed. 1.11 RESUBMISSION REQUIREMENTS A. Make all corrections or changes in the documents required by the Designer and resubmit to the Designer until approved. 1. Revise initial drawings or data and resubmit as specified for the original document. 2. Highlight or cloud in green those revisions which have been made in response to the previous reviews by the Designer. This will include changes previously highlighted or clouded in yellow to direct attention to Designer to items requiring selections or decisions by the Designer or highlighted or clouded in orange for a requested deviation from the Contract Documents. Shop Drawings 013302-9 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 3. Highlight and cloud new items in yellow where selections or decisions by the Designer are required, but such selections do not constitute a deviation from the Contract Documents. Add explanatory comments to the markup to indicate the action to be taken by the Designer. 4. Highlight and cloud new items in orange that are deviation requests. Include the deviation request number on the Shop Drawing that corresponds to the deviation request on the Shop Drawing Deviation Request form. Numbering for these new items is to start with the next number following the last Shop Drawing deviation requested. Include explanatory comments in the Shop Drawing Deviation Request form. B. Pay for excessive review of Shop Drawings. 1. Excessive review of Shop Drawings is defined as any review required after the original review has been made and the first resubmittal has been checked to see that corrections have been made. 2. Review of Shop Drawings or Samples will be an additional service requiring payment by the Contractor if the Contractor submits a substitution for a product for which a Shop Drawing or Sample has previously been approved, unless the need for such change is beyond the control of Contractor. 3. Cost for additional review time will be billed to the Owner by the Designer for the actual hours required for the review of Shop Drawings by Designer and in accordance with the rates listed in SECTION 00 73 00 SUPPLEMENTARY CONDITIONS. 4. A Set-off will be included in each Application for Payment to pay cost for the additional review to the Owner on a monthly basis. The Set-off will be based on invoices submitted to Owner for these services. 5. Need for more than one resubmission or any other delay of obtaining Designer's review of Shop Drawings will not entitle the Contractor to an adjustment in Contract Price or an extension of Contract Times. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Shop Drawings 013302- 10 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 01 33 03 RECORD DATA 1.00 GENERAL 1.01 WORK INCLUDED A. Submit Record Data as required by the Contract Documents and as reasonably requested by the OPT. Provide Record Data for all products unless a Shop Drawing is required for the same item. B. Submit Record Data to provide documents that allow the Owner to: 1. Record the products incorporated into the Project for the Owner; 2. Review detailed information about the products regarding their fabrication, installation, commissioning, and testing; and 3. Provide replacement or repair of the products at some future date. C. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the receipt or cursory review of Record Data. Contract modifications can only be approved by Change Order or Field Order. D. Provide various reports or other documents that Contract Documents required be submitted for record purposes. 1.02 QUALITY ASSURANCE A. Submit legible, accurate, and complete documents presented in a clear, easily understood manner. Record Data not meeting these criteria will be rejected. 1.03 CONTRACTOR'S RESPONSIBILITIES A. Submit Record Data for the following items: Specification Section Record Data Description 01 31 13 CONTRACTOR'S RECORD DOCUMENTS. B. Include Record Data in the Schedule of Documents required by SECTION 0133 00 DOCUMENT MANAGEMENT to indicate the Record Data to be submitted, the dates on which documents are to be sent to the Designer for review, and proposed dates that the product will be incorporated into the Project. C. Complete the following before submitting Record Data: 1. Prepare Record Data and coordinate with Shop Drawings or Samples, other Record Data, and with the requirements of the Work and the Contract Documents; 2. Determine and verify specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information; 3. Determine and verify the suitability of materials and equipment offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and Record Data 013303- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 4. Determine and verify information relative to Contractor's responsibilities for means, methods,techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto. D. Determine and verify: 1. Accurate field measurements, quantities, and dimensions are shown on the Record Data; 2. Location of existing structures, utilities, and equipment related to the Record Data have been shown and conflicts between the products existing structures, utilities, and equipment have been identified; 3. Conflicts that impact the installation of the products have been brought to the attention of the OPT through the Designer; 4. Record Data are complete for their intended purpose; and 5. Conflicts between the Record Data related to the various Subcontractors and Suppliers have been resolved. E. Review Record Data prior to submitting to the Designer. Certify that all Record Data has been reviewed by the Contractor and is in strict conformance with the Contract Documents as modified by Addenda, Change Order, Field Order, or Contract Amendment when submitting Record Data. 1.04 RECORD DATA REQUIREMENTS A. Include a complete description of the material or equipment to be furnished, including: 1. Type, dimensions, size, arrangement, model number, and operational parameters of the components; 2. Weights, gauges, materials of construction, external connections, anchors, and supports required; 3. All applicable standards such as ASTM or Federal specification numbers; 4. Fabrication and installation drawings, setting diagrams, manufacturing instructions, templates, patterns, and coordination drawings; 5. Mix designs for concrete, asphalt, or other materials proportioned for the Project; and 6. Complete and accurate field measurements for products which must fit existing conditions. Indicate on the document submittal that the measurements represent actual dimensions obtained at the Site. 1.05 SPECIAL CERTIFICATIONS AND REPORTS A. Provide all required certifications with the Record Data as specified in the individual Specification Sections: 1. Certified Test Reports (CTR): A report prepared by an approved testing agency giving results of tests performed on products to indicate their compliance with the Specifications. This report is to demonstrate that the product when installed will meet the requirements and is part of the Record Data. Field tests may be performed by the Record Data 013303-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 Owner to determine that in place materials or products meet the same quality as indicated in the CTR submitted as part of the Record Data. 1.06 WARRANTIES AND GUARANTEES A. Provide all required warranties, guarantees, and related documents with the Record Data. The effective date of warranties and guarantees will be the date of acceptance of the Work by the Owner. B. Identify all Extended Warranties, defined as any guarantee of performance for the product or system beyond the 1 year correction period described in the General Conditions. Issue the warranty certificate in the name of the Owner. Provide a Warranty Bond for Extended Warranties if required by Specification Sections. C. Provide a copy of all warranties in a separate document in accordance with SECTION 0170 00 EXECUTION AND CLOSEOUT REQUIREMENTS. 1.07 RECORD DATA SUBMITTAL PROCEDURES A. Submit Record Data through the Designer. Send all documents in digital format for processing. 1. Provide all information requested in the Record Data submittal form. Do not leave any blanks incomplete. If information is not applicable, enter NA in the space provided. The Record Data submittal form is to be the first document in the file. 2. Submit all documents in Portable Document Format(PDF). a. Create PDF document using Bluebeam Revu software or other compatible software that will create files that can be opened and annotated using Bluebeam Revu software. b. Create PDF documents from native format files unless files are only available from scanned documents. C. Rotate pages so that the top of each document appears at the top of the monitor screen when opened in PDF viewing software. d. Submit PDF document with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. e. Submit color PDF documents where color is required to interpret the Record Data. f. Create or convert documents to allow text to be selected for comments or searched using text search features. Run scanned documents through Optical Character Recognition (OCR) software if necessary. g. Flatten markups in documents to prevent markups made by Contractor from being moved or deleted. Flatten documents to allow markup recovery. h. Use Bluebeam Revu software to reduce file size using default settings except the option for"Drop Metadata." Uncheck the "Drop Metadata" box when reducing file size. Record Data 013303-3 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 i. Add footers to each document with the Project name. 3. Submit each specific product, class of material, or product separately so these can be tracked and processed independently. Do not submit Record Data for more than one system in the same Record Data. 4. Submit items specified in different Specification Sections separately unless they are part of an integrated system. 5. Define abbreviations and symbols used in Record Data. a. Use terms and symbols in Record Data consistent with the Contract Drawings. b. Provide a list of abbreviations and their meaning as used in the Record Data. C. Provide a legend for symbols used on Record Data. 6. Mark Record Data to reference: a. Related Specification Sections, b. Drawing number and detail designation, C. Product designation or name, d. Schedule references, e. System into which the product is incorporated, and f. Location where the product is incorporated into the Project. B. Submit a Change Proposal per SECTION 01 31 14 CHANGE MANAGEMENT to request modifications to the Contract Documents, including those for approval of"or equal" products when specifically allowed by the Contract Documents or as a substitution for specified products or procedures. Deviations from the Contract Documents can only be approved by a Modification. C. Complete the certification required by Paragraph 1.03. 1.08 DESIGNER'S RESPONSIBILITIES A. Record Data will be received by the Designer, logged, and provided to Owner as the Project record. 1. Record Data may be reviewed to see that the information provided is adequate for the purpose intended. Record Data not meeting the requirements of Paragraph 1.02 may be rejected as unacceptable. 2. Record Data is not reviewed for compliance with the Contract Documents. Comments may be returned if deviations from the Contract Documents are noted during the cursory review performed to see that the information is adequate. 3. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the review of Record Data. Contract modifications can only be approved by a Modification. B. Designer may take the following action in processing Record Data: Record Data 013303-4 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 1. File Record Data as received if the cursory review indicates that the document meets the requirements of Paragraph 1.02. Document will be given the status of"Filed as Received" and not further action is required on that Record Data. 2. Reject the Record Data for one of the following reasons: a. The document submittal requirements of the Contract Documents indicate that the document submitted as Record Data should have been submitted as a Shop Drawing. The Record Data will be marked "Rejected" and "Submit Shop Drawing." No further action is required on this document as Record Data and the Record Data process will be closed. Resubmit the document as a Shop Drawing per SECTION 0133 02 SHOP DRAWINGS. b. The cursory review indicates that the document does not meet the requirements of Paragraph 1.02. The Record Data will be marked "Rejected" and "Revise and Resubmit." Contractor is to resubmit the Record Data until it is acceptable and marked "Filed as Received." When Record Data is filed, no further action is required and the Record Data process will be closed. C. The Record Data is not required by the Contract Documents nor is applicable to the Project. The Record Data will be marked "Rejected" and "Cancel - Not Required." No further action is required and the Record Data process will be closed. C. Contractor is to resubmit the Record Data until it is acceptable and marked "Filed as Received." 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Record Data 013303-5 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 01 33 04 CONSTRUCTION PROGRESS SCHEDULE 1.00 GENERAL 1.01 REQUIREMENTS A. Prepare and submit a Progress Schedule for the Work and update the schedule on a monthly basis for the duration of the Project. B. Provide schedule in adequate detail to allow Owner to monitor progress and to relate document processing to sequential activities of the Work. C. Incorporate and specifically designate the dates of anticipated submission of documents and the dates when documents must be returned to the Contractor into the schedule. D. Assume complete responsibility for maintaining the progress of the Work per the schedule submitted. E. Take the requirements of SECTION 0135 00 SPECIAL PROCEDURES into consideration when preparing schedule. 1.02 DOCUMENT SUBMITTAL A. Submit Progress Schedules in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT. B. Submit a preliminary schedule within 10 days after the Notice of Award. The schedule is to be available at the pre-construction conference. C. Submit a detailed schedule at least 10 days prior to the first payment request. D. Submit Progress Schedules updates monthly with Applications for Payment to indicate the progress made on the Project to that date. Failure to submit the schedule may cause delay in the review and approval of Applications for Payment. 1.03 SCHEDULE REQUIREMENTS A. Schedule is to be in adequate detail to: 1. Assure adequate planning, scheduling, and reporting during the execution of the Work; 2. Assure the coordination of the Work of the Contractor and the various Subcontractors and Suppliers; 3. Assist in monitoring the progress of the Work; and 4. Assist in evaluating proposed changes to the Contract Times and Project schedule. B. Provide personnel with 5 years' minimum experience in scheduling construction work comparable to this Project. Prepare the schedule using acceptable scheduling software. C. Provide the schedule in the form of a computer generated critical path schedule which includes Work to be performed on the Project. It is intended that the schedule accomplish the following: 1. Give early warning of delays in time for correction. Construction Progress Schedule 013304- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 2. Provide detailed plans for the execution of the Work in the form of future activities and events in sequential relationships. 3. Establish relationships of significant planned Work activities and provide a logical sequence for planned Work activities. 4. Provide continuous current status information. 5. Allow analysis of the Contractor's program for the completion of the Project. 6. Permit schedules to be revise when the existing schedule is not achievable. 7. Log the progress of the Work as it actually occurs. D. Prepare a time scaled CPM arrow or precedence diagram to indicate each activity and its start and stop dates. 1. Develop Milestone dates and Project completion dates to conform to time constraints, sequencing requirements and Contract completion date. 2. Use calendar day durations while accounting for holidays and weather conditions in the projection of the duration of each activity. 3. Clearly indicate the critical path for Work to complete the Project. E. Provide a time scaled horizontal bar chart which indicates graphically the Work scheduled at any time during the Project. The chart is to indicate: 1. Complete sequence of construction by activity; 2. Identification of the activity by structure, location, and type of Work; 3. Chronological order of the start of each item of Work; 4. The activity start and stop dates; 5. The activity duration; 6. Successor and predecessor relationships for each activity; 7. A clearly indicated single critical path; and 8. Projected percentage of completion, based on dollar value of the Work included in each activity as of the first day of each month. F. Provide a schedule incorporating the Schedule of Documents provided in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT indicating: 1. Specific dates each document is to be delivered to the Designer. 2. Specific dates each document must be received in order to meet the proposed schedule. 3. Allow a reasonable time to review documents,taking into consideration the size and complexity of the document, other documents being processed, and other factors that may affect review time. 4. Allow time for re-submission of the each document. Contractor is responsible for delays associated with additional time required to review incomplete or erroneous Construction Progress Schedule 013304-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 documents and for time lost when documents are submitted for products that do not meet Specification requirements. 1.04 SCHEDULE REVISIONS A. Revise the schedule if it appears that the schedule no longer represents the actual progress of the Work. 1. Submit a written report if the schedule indicates that the Project is more than 30 days behind schedule. The report is to include: a. Number of days behind schedule; b. Narrative description of the steps to be taken to bring the Project back on schedule; and C. Anticipated time required to bring the Project back on schedule. 2. Submit a revised schedule indicating the action that the Contractor proposes to take to bring the Project back on schedule. B. Revise the schedule to indicate any adjustments in Contract Times approved by Modification. 1. Include a revised schedule with Change Proposals if a change in Contract Times is requested. 2. OPT will deem any Change Proposal that does not have a revised schedule and request for a change in Contract Times as having no impact on the ability of the Contractor to complete the Project within the Contract Times. C. Updating the Project schedule to reflect actual progress is not considered a revision to the Project schedule. D. Applications for Payment may not be recommended for payment without a revised schedule and if required, the report indicating the Contractor's plan for bringing the Project back on schedule. 1.05 FLOATTIME A. Define float time as the amount of time between the earliest start date and the latest start date of a chain of activities on the construction schedule. B. Float time is not for the exclusive use or benefit of either the Contractor or Owner. C. Where several subsystems each have a critical path, the subsystem with the longest time of completion is the critical path and float time is to be assigned to other subsystems. D. Contract Times cannot be changed by the submission of a schedule. Contract Times can only be modified by a Change Order or Contract Amendment. E. Schedule completion date must be the same as the Contract completion date. Time between the end of construction and the Contract completion date is float time. Construction Progress Schedule 013304-3 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Construction Progress Schedule 013304-4 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 01 33 05 VIDEO AND PHOTOGRAPHIC DOCUMENTATION 1.00 GENERAL 1.01 WORK INCLUDED A. Provide a video recording of the Site prior to the beginning of construction. 1. Record the condition of all existing facilities in or abutting the construction area (right- of-way) including but not limited to streets, curb and gutter, utilities, driveways, fencing, landscaping, etc. 2. Record after construction staking is complete but prior to any clearing. 3. Provide one copy of the recording, dated and labeled to the OAR before the start of construction. Provide additional recording as directed by the OAR if the recording provided is not considered suitable for the purpose of recording pre-existing conditions. B. Furnish an adequate number of photographs of the Site to clearly depict the completed Project. 1. Provide a minimum of ten different views. 2. Photograph a panoramic view of the entire Site. 3. Photograph all significant areas of completed construction. 4. Completion photographs are not to be taken until all construction trailers, excess materials, trash, and debris have been removed. 5. Employ a professional photographer approved by the OAR to photograph the Project. 6. Provide one aerial photograph of the Site from an angle and height to include the entire Site while providing adequate detail. C. All photographs, video recordings, and a digital copy of this media are to become the property of the Owner. Photographs or recordings may not be used for publication, or public or private display without the written consent of the Owner. 1.02 QUALITY ASSURANCE A. Provide clear photographs and recordings taken with proper exposure. View photographs and recordings in the field and take new photographs or recordings immediately if photos of an adequate print quality cannot be produced or video quality is not adequate. Provide photographs with adequate quality and resolution to permit enlargements. 1.03 DOCUMENT SUBMITTAL A. Submit photographic documentation as Record Data in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT. B. Submit two DVDs of the video recording as Record Data in accordance with SECTION 0133 00 DOCUMENT MANAGEMENT. Video and Photographic Documentation 013305- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 2.00 PRODUCTS 2.01 PHOTOGRAPHS A. Provide photographs in digital format with a minimum resolution of 1280 x 960, accomplished without a digital zoom. B. Take photographs at locations acceptable to the OAR. C. Provide two color prints of each photograph and a digital copy on a DVD of each photograph taken. D. Identify each print on back with: 1. Project name. 2. Date, time, location, and orientation of the exposure. 3. Description of the subject of photograph. E. Submit photograph in clear plastic sheets designed for photographs. Place only one photograph in each sheet to allow the description on the back to be read without removing the photograph. F. Final photographs are to include two 8-by-10-inch glossy color prints for each of ten photographs selected by the OAR. These photographs are in addition to normal prints. 2.02 VIDEO RECORDING A. Provide digital format on DVD that can be played with Windows Media Player in common format in full screen mode. B. Identify Project on video by audio or visual means. C. Video file size should not exceed 400 MB. D. Video resolution shall be 1080p. E. The quality of the video must be sufficient to determine the existing conditions of the construction area. Camera panning must be performed while at rest, do not pan the camera while walking or driving. Camera pans should be performed at intervals sufficient to clearly view the entire construction area. F. DVD shall be labeled with construction stationing and stationing should be called out, voice recorded, in the video. G. The entire construction area recording shall be submitted at once. Sections submitted separately will not be accepted. 3.00 EXECUTION (NOT USED) END OF SECTION Video and Photographic Documentation 013305-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 01 35 00 SPECIAL PROCEDURES 1.00 GENERAL 1.01 CONSTRUCTION SEQUENCE A. Perform the Work as required to complete the entire Project within the Contract Times and in the sequence stipulated below: 1. Phasing and Construction sequence shall be as required in the plans. B. Work shall be completed within the specified time for these items: Description Time N/A N/A C. Consider the sequences, duration limitations, and governing factors outlined in this Section to prepare the schedule for the Work. D. Perform the Work not specifically described in this Section as required to complete the entire Project within the Contract Times. 1.02 PLAN OF ACTION A. Submit a written plan of action for approval for shutting down essential services. These include: 1. Electrical power, 2. Control power, 3. Pipelines or wastewater systems, 4. Communications equipment, and 5. Other designated functions. B. Describe the following in the plan of action: 1. Scheduled dates for construction; 2. Work to be performed; 3. Utilities, piping, or services affected; 4. Length of time the service or utility will be disturbed; 5. Procedures to be used to carry out the Work; 6. Plan of Action to handle emergencies; 7. List of manpower, equipment, and ancillary supplies; 8. Backups for key pieces of equipment and key personnel; 9. Contingency plan that will be used if the original schedule cannot be met; and Special Procedures 013500- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 C. Submit plan 2 weeks prior to beginning the Work. 1.03 CRITICAL OPERATIONS A. The Owner has identified critical operations that must not be out of service longer than the designated maximum time out of service and/or must be performed only during the designated times. These have been identified in the table below. Max.Time Hours Operation Liquidated Critical Operation Damages Out of Operation can be Shut Down ($ per hour) Water Services 4 hours 4 hours $400 B. Submit a written plan of action per Paragraph 1.02 for approval for critical operations. C. Work affecting critical operations is to be performed on a 24-hour a day basis until Owner's normal operations have been restored. D. Provide additional manpower and equipment as required to complete the Work affecting critical operations within the allotted time. E. Liquidated damages will be assessed if Work on critical operations is not completed within the time indicated. F. Designated Critical Operations are described in more detail as follows: 1. Critical Operation 1—Water Service a. No critical operations have been identified for this project. b. Contractor shall restore water service to affected properties immediately upon completing the water line construction and testing. 1.04 OWNER ASSISTANCE NOT APPLICABLE A. The Owner will assist the Contractor in draining the existing pipelines as much as possible through existing blow-off valves. The Contractor will be responsible for providing dewatering pumps, etc. required to completely dewater the facilities and handle any leakage past closed valves,gates, or adjacent structures. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Special Procedures 013500-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 014000 QUALITY MANAGEMENT 1.00 GENERAL 1.01 CONTRACTOR'S RESPONSIBILITIES A. Review the OPT's Quality Management Program and prepare and submit the Contractor's Quality Control Plan. B. Implement the Contractor's Quality Control Plan to control the quality of the Work and verify that the Work meets the standards of quality established in the Contract Documents. 1. Inspect products to be incorporated into the Project. Ensure that Suppliers have adequate quality control systems to ensure that products that comply with the Contract Documents are provided. 2. Integrate quality control measures into construction activities to produce Work which meets quality expectations of the Contract Documents. Inspect the Work of the Contractor, Subcontractors, and Suppliers. Correct Defective Work. 3. Provide and pay for the services of an approved professional materials testing laboratory acceptable to the OPT to provide testing that demonstrates that products proposed in Shop Drawings and Record Data for the Project fully comply with the Contract Documents. 4. Provide facilities, equipment, and Samples required for quality control inspections and tests: a. Give the OAR adequate notice before proceeding with Work that would interfere with inspections or testing; b. Notify the OAR and testing laboratories prior to the time that testing is required, providing adequate lead time to allow arrangements for inspections or testing to be made; C. Do not proceed with any Work that would impact the ability to correct defects or Work that would require subsequent removal to correct defects until testing services have been performed and results of tests indicate that the Work is acceptable; d. Cooperate fully with the performance of sampling, inspection, and testing; e. Provide personnel to assist with sampling or to assist in making inspections and field tests; f. Obtain and handle Samples for testing at the Site or at the production source of the product to be tested; g. Provide adequate quantities of representative products to be tested to the laboratory at the designated locations; h. Provide facilities required to store and cure test Samples; i. Provide calibrated scales and measuring devices for the OPT's use in performing inspections and testing; Quality Management 014000- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 j. Provide adequate lighting to allow OPT observations; and k. Make Contract Documents available to testing agencies when requested. 5. Provide safe access for all inspection and testing activities, including those to be conducted as part of the OPT's Quality Management Program. 6. Document Defective Work though Certified Test Reports and Defective Work Notices. Document that corrective actions have been taken to correct any defects and that corrected Work is in compliance with the Contract Documents. 7. Apply quality control measures to documentation provided for the Project. 8. Implement countermeasures to prevent future Defective Work. C. Perform tests as indicated in this and other Sections of the Specifications. Technical Specifications govern if any testing and inspection requirements of this Section conflict with the testing and inspection requirements of the technical Specifications. D. All verification testing is to be observed by the OAR or designated representative. E. Send test reports to the Designer. F. Provide an update on quality control activities at monthly progress meetings required by SECTION 01 31 13 PROJECT COORDINATION. G. Owner will withhold payment for Defective Work, or Work that has not been tested or inspected in accordance with the Contractor's Quality Control Plan, the OPT's Quality Control Program, or the Contract Documents. H. Work performed that is connected or adjacent to Defective Work or Work that would have to be removed to correct Defective Work is also considered to be Defective. Contractor is responsible for all cost with replacing any acceptable Work that must be removed, or might be damaged by corrective actions. 1.02 QUALITY MANAGEMENT ACTIVITIES BY THE OPT A. OPT will perform its own quality assurance tests independent of the Contractor's Quality Control Program. Assist the OPT and testing organizations in performing quality assurance activities per Paragraph 1.01. B. Quality assurance testing performed by the OPT will be paid for by the Owner, except for verification testing required per Paragraph 1.07. C. Quality assurance activities of the OPT,through their own forces or through contracts with consultants and materials testing laboratories are for the purpose of monitoring the results of the Contractor's Work to see that it is in compliance with the requirements of the Contract Documents. Quality assurance activities or non-performance of quality assurance activities by the OPT do not: 1. Relieve the Contractor of its responsibility to provide Work or furnish products that conform with the requirements of the Contract Documents; 2. Relieve the Contractor of its responsibility for providing adequate quality control measures; Quality Management 014000-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 3. Relieve the Contractor of its responsibility for damage to or loss of Work or products before OPT's acceptance; 4. Constitute or imply OPT's acceptance; and 5. Affect the continuing rights of the Owner after OPT's acceptance of the completed Work. D. Work is subject to OPT's quality assurance observations or testing at any time. Products which have been tested or inspected and approved by OPT at a supply source or staging area may be inspected or tested again by the OPT before, during or after incorporation into the Work and rejected if products do not comply with the Contract Documents. 1.03 CONTRACTOR'S USE OF OPT'S TEST REPORTS A. OPT has prepared a Quality Management Plan that describes, in general, the OPT's anticipated quality assurance testing program for this Project. This testing program will be made available to Bidders during the bidding phase. This plan outlines only the testing in general terms and may not reflect actual testing. Actual testing will depend on the Contractors means, methods and procedures of construction which will not be known until the Contractor begins Work and submits their own Quality Control Plan for review. There is no guarantee that all testing will be performed. B. Contractor will receive copies of all test reports documenting OPT's quality assurance activities. Contractor is entitled to rely on the accuracy of these tests results and use these as part of their quality control efforts. C. Contractor is to determine additional testing or inspections that may be required to implement the Contractor's Quality Control Plan. Include cost for additional testing and inspections required to meet Contractors quality control obligations, including the cost for correcting Defective Work in the Contract Price. D. Contractor may submit a Change Proposal if OPT's quality assurance testing program deviates significantly from the OPT's Quality Management Plan, and Contractor can demonstrate that additional cost was incurred to implementing the Contractor's Quality Control Plan resulting from these deviations. 1.04 DOCUMENTATION A. Provide documentation which includes: 1. Contractor's Quality Management Plan that establishes the methods of assuring compliance with the Contract Documents. Submit this plan as a Shop Drawings per SECTION 0133 02 SHOP DRAWINGS. 2. A Statement of Qualification for any proposed testing laboratories that includes a list of the engineers and technical staff that will provide testing services on the Project, descriptions of the qualifications of these individuals, list of tests that can be performed, equipment used with date of last certification, and a list of recent projects for which testing has been performed with references for those projects. 3. Provide Certified Test Reports for products to be incorporated into the Project. Provide reports to indicate that proposed products comply with the Contract Documents or indicate that proposed products do not comply with the Contract Quality Management 014000-3 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 Documents and why it does not comply. Submit these test reports as part of a Shop Drawings submitted per SECTION 0133 02 SHOP DRAWINGS. 4. Provide Certified Test Reports for inspection and testing required in this Section and in other Specification Sections. Provide reports to indicate that Work complies with the Contract Documents or indicate that Work does not comply with the Contract Documents they are not in compliance and why it does not comply. Submit these test reports on forms provided per SECTION 0133 00 DOCUMENT MANAGEMENT. 1.05 STANDARDS A. Provide testing laboratories that comply with the American Council of Independent Laboratories (ACIL) "Recommended Requirements for Independent Laboratory Qualifications." B. Perform testing per recognized test procedures as listed in the various Sections of the Specifications, standards of the State Department of Highways and Public Transportation, American Society of Testing Materials (ASTM), or other testing associations. Perform tests in accordance with published procedures for testing issued by these organizations. 1.06 DELIVERY AND STORAGE A. Handle and protect test specimens of products and construction materials at the Site in accordance with recognized test procedures. Provide facilities for storing, curing, processing test specimens as required by test standard to maintain the integrity of Samples. 1.07 VERIFICATION TESTING FOR CORRECTED DEFECTS A. Provide verification testing on Work performed to correct Defective Work to demonstrate that the Work is now in compliance with the Contract Documents. Document that Defective Work has been corrected and verify that the OAR closes the item in the Defective Work Register. B. Pay for verification testing. OPT may perform verification testing as part of their Quality Management Program and impose a Set-off to recover the cost for this testing. C. Conduct the same tests or inspections used to determine that the original Work was Defective. Different tests or methods may be used if approved by the OPT. 1.08 TEST REPORTS A. Certified Test Reports are to be prepared for all tests. 1. Tests performed by testing laboratories may be submitted on their standard test report forms if acceptable to the OPT. These reports must include the following: a. Name of the Owner, Project title and number and Contractor; b. Name of the laboratory, address, and telephone number; C. Name and signature of the laboratory personnel performing the test; d. Description of the product being sampled or tested; Quality Management 014000-4 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 e. Date and time of sampling, inspection, and testing; f. Date the report was issued; g. Description of the test performed; h. Weather conditions and temperature at time of test or sampling; i. Location at the Site or structure where the test was taken; j. Standard or test procedure used in making the test; k. A description of the results of the test; I. Statement of compliance or non-compliance with the Contract Documents; and m. Interpretations of test results, if appropriate. 2. Submit reports on tests performed by Contractor, Subcontractors or Suppliers on the forms provided by the OAR. 3. OPT will prepare test reports on test performed by the OPT. B. Send test report to Designer within 24 hours of completing the test. Flag tests reports with results that do not comply with Contract Documents for immediate attention. C. Payment for Work may be withheld until test reports indicate that the Work is not Defective. 1.09 DEFECTIVE WORK A. Immediately correct any Defective Work or notify the OAR why the Work is not to be corrected immediately and when corrective action will be completed. B. No payment will be made for Defective Work. Remove Work from the Application for Payment if Work paid for on a previous Application for Payment is found to be Defective. 1.10 LIMITATION OF AUTHORITY OF THE TESTING LABORATORY A. The testing laboratory representatives are limited to providing testing services and interpreting the results of the test performed. B. The testing laboratory is not authorized to: 1. Alter the requirements of the Contract Documents; 2. Accept or reject any portion of the Work; 3. Perform any of the duties of the Contractor; or 4. Direct or stop the Work. 1.11 QUALITY CONTROL PLAN A. Submit the Contractor's Quality Control Plan for approval as a Shop Drawing per SECTION 0133 02 SHOP DRAWINGS. Use Contractor's Quality Control Plan Checklist provided to review the document before submitting and include a copy of the completed checklist with the Contractor's Quality Control Plan. Do not begin Work until the Contractor's Quality Control Plan is approved. Submit an interim plan covering only the portion of Work to be Quality Management 014000-5 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 performed if the Contractor plans to begin Work prior to submitting the Contractor's Quality Control Plan for the Project. Do not begin Work on other parts of the Project until the Contractor's Quality Control Plan is approved or another interim plan covering the additional Work to be started is approved. B. Provide a Contractor's Quality Control Plan that incorporates construction operations at both the Site and production Work at remote locations and includes Work by Subcontractors and Suppliers. The Contractor's Quality Control Plan is to include: 1. A description of the quality control organization, including an organization chart showing lines of authority to control the quality of Work; 2. Documentation describing name, qualifications (in resume format), duties, responsibilities, and level of authority of the Quality Control Manager; 3. The name, qualifications (in resume format), duties, responsibilities, and authorities of other persons assigned a quality control function; 4. Procedures for scheduling, reviewing, certifying, and managing documentation, including documentation provided by Subcontractors and Suppliers; 5. Control, verification, and acceptance testing procedures for each specific test. Include: a. Name of tests to be performed, b. Specification paragraph requiring test, C. Parameters of Work to be tested, d. Test frequency, e. Persons responsible for each test, and f. Applicable industry testing standards and laboratory facilities to be used for the test; 6. Integrate the OPT quality assurance testing into the Contractor's Quality Control Plan, specifically identifying the tests or inspections in Paragraph 1.11.13.5 that will be provided by the OPT as part of their Quality Management Program; 7. Procedures for tracking and documenting quality management efforts. 8. Procedures for tracking Defective Work from initial identification through acceptable corrective action. Indicate how documentation of the verification process for deficiencies will be made. 9. Reporting procedures which incorporate the use of forms provided by the OAR. 10. The name of the proposed testing laboratories along with documentation of qualifications per Paragraph 1.04. C. The Quality Control Manager must have authority to reject Defective Work and redirect the efforts of the Contractor's Team to prevent or correct Defective Work. D. Notify the Designer of any changes to the Contractor's Quality Control Plan or quality control personnel. Quality Management 014000-6 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 E. Meet with the OPT 7 days after Contractor's Quality Control Plan is submitted and before start of construction to discuss the Contractor's Quality Control Plan and expedite its approval. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION 3.01 IMPLEMENT CONTRACTOR'S QUALITY CONTROL PLAN A. Perform quality control observations and testing as required in each Section of the Specifications and where indicated on the Drawings. B. Includes the following phases for each definable Work task. A definable Work task is one which is separate and distinct from other tasks, has separate control requirements, may be provided by different trades or disciplines, or may be Work by the same trade in a different environment. 1. Planning Phase: Perform the following before beginning each definable Work task: a. Review the Contract Drawings. b. Review documents and determine that they are complete in accordance with the Contract Documents. C. Check to assure that all materials and/or equipment have been tested, submitted, and approved. d. Examine the work area to assure that all required preliminary Work has been completed and complies with the Contract Documents. e. Examine required materials, equipment, and Sample Work to assure that they are on hand, conform to Shop Drawings and Record Data, and are properly stored. f. Review requirements for quality control inspection and testing. g. Discuss procedures for controlling quality of the Work. Document construction tolerances and workmanship standards for the Work task. h. Check that the portion of the plan for the Work to be performed incorporates document review comments. i. Discuss results of planning phase with the OAR. Conduct a meeting attended by the Quality Control Manager, the OAR, superintendent, other quality control personnel as applicable, and the foreman responsible for the Work task. Instruct applicable workers as to the acceptable level of workmanship required in order to meet the requirements of the Contract Documents. Document the results of the preparatory phase actions by separate meeting minutes prepared by the Quality Control Manager and attached to the quality control report. j. Do not move to the next phase unless results of investigations required for the planning phase indicate that requirements have been met. Quality Management 014000-7 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 2. Work Phase: Complete this phase after the Planning Phase: a. Notify the OAR at least 24 hours in advance of beginning the Work and discuss the review of the planning effort to indicate that requirements have been met. b. Check the Work to ensure that it is in full compliance with the Contract Documents. C. Verify adequacy of controls to ensure full compliance with Contract Documents. Verify required control inspection and testing is performed. d. Verify that established levels of workmanship meet acceptable workmanship standards. Compare with required Sample panels as appropriate. e. Repeat the Work phase for each new crew to work on-site, or any time acceptable specified quality standards are not being met. 3. Follow-up Phase: Perform daily checks to assure control activities, including control testing, are providing continued compliance with contract requirements: a. Make checks daily and record observations in the quality control documentation. b. Conduct follow-up checks and correct all deficiencies prior to the start of additional Work tasks that may be affected by the Defective Work. Do not build upon nor conceal Defective Work. C. Conduct a review of the Work one month prior to the expiration of the correction period prescribed in the General Conditions with the OPT. Correct defects as noted during the review. C. Conduct additional planning and Work phases if: 1. The quality of on-going Work is unacceptable; 2. Changes are made in applicable quality control staff, on-site production supervision or crews; 3. Work on a task is resumed after a substantial period of inactivity; or 4. Other quality problems develop. END OF SECTION Quality Management 014000-8 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 01 50 00 TEMPORARY FACILITIES AND CONTROLS 1.00 GENERAL 1.01 WORK INCLUDED A. Provide temporary facilities, including OPT's field office and the Contractor's field offices, storage sheds, and temporary utilities needed to complete the Work. B. Install and maintain temporary Project identification signs. Provide temporary on-site informational signs to identify key elements of the construction facilities. Do not allow other signs to be displayed. 1.02 QUALITY ASSURANCE A. Provide a total electrical heating and cooling system for the OPT's field office capable of maintaining the following conditions: 1. Heating: Minimum 75 degrees ID temp at 10 degrees ambient. 2. Cooling: Minimum 75 degrees ID temp at 105 degrees ambient. 3. Relative humidity: 48 to 54 percent. B. Inspect and test each service before placing temporary utilities in use. Arrange for all required inspections and tests by regulatory agencies, and obtain required certifications and permits for use. 1.03 DELIVERY AND STORAGE A. Arrange transportation, loading, and handling of temporary buildings and sheds. 1.04 JOB CONDITIONS A. Locate buildings and sheds at the Site as indicated or as approved by the OPT. B. Prepare the Site by removing trees, brush, or debris and performing demolition or grubbing needed to clear a space adequate for the structures. C. Pay for the utilities used by temporary facilities during construction. D. Provide each temporary service and facility ready for use at each location when the service or facility is first needed to avoid delay in the performance of the Work. Provide OPT's field office complete and ready for occupancy and use within 7 days of the Notice to Proceed. E. Maintain, expand as required, and modify temporary services and facilities as needed throughout the progress of the Work. F. Remove services and facilities when approved by the OAR. G. Operate temporary facilities in a safe and efficient manner. 1. Restrict loads on temporary services or facilities to within their designed or designated capacities. 2. Provide sanitary conditions. Prevent public nuisance or hazardous conditions from developing or existing at the Site. Temporary Facilities and Controls 015000- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 3. Prevent freezing of pipes, flooding, or the contamination of water. 4. Maintain Site security and protection of the facilities. 1.05 OPTIONS A. Construction offices may be prefabricated buildings on skids or mobile trailers. B. Storage sheds may be prefabricated buildings on skids or truck trailers. 2.00 PRODUCTS 2.01 TEMPORARY FIELD OFFICES(FIELD OFFICE NOT REQUIRED) A. The Contractor must furnish the OPT with a field office at the Site. The field office must contain at least 120 square feet of useable space. The field office must be air-conditioned and heated and must be furnished with an inclined table that measures at least 30 inches by 60 inches and two chairs. The Contractor shall move the field office on the Site as required by the OAR. The field office must be furnished with a telephone (with 24-hour per day answering service) and fax machine paid for by the Contractor. There is no separate pay item for the field office. B. Furnish a field office of adequate size for Contractor's use. Provide conference room space for a minimum of 15 people. C. Other trades may provide their own offices only when space is available at the Site, and the OPT agrees to its size, condition, and location. D. No monthly partial payments will be processed until OPT's field office facilities are completed and approved. 2.02 TEMPORARY STORAGE BUILDINGS A. Furnish storage buildings of adequate size to store any materials or equipment delivered to the Site that might be affected by weather. 2.03 TEMPORARY SANITARY FACILITIES A. Provide sanitary facilities at the Site from the commencement of the Project until Project conclusion. Maintain these facilities in a clean and sanitary condition at all times, and comply with the requirements of the local health authority. On large sites, provide portable toilets at such locations that no point in the Site shall be more than 600 feet from a toilet. B. Use these sanitary facilities. Do not use restrooms within existing or Owner-occupied buildings. 2.04 TEMPORARY HEAT A. Provide heating devices needed to protect buildings during construction. Provide fuel needed to operate the heating devices and attend the heating devices at all times they are in operation, including overnight operations. Temporary Facilities and Controls 015000-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 2.05 TEMPORARY UTILITIES A. Provide the temporary utilities for administration, construction, testing, disinfection, and start-up of the Work, including electrical power,water, and telephone. Pay all costs associated with furnishing temporary utilities. 1. Provide a source of temporary electrical power of adequate size for construction procedures. a. Use existing power systems where spare capacity is available. Provide temporary power connections that do not adversely affect the existing power supply. Submit connections to the OAR for approval prior to installation. b. Provide electrical pole and service connections that comply with Laws and Regulations and the requirements of the power company. 2. Provide telephone service to the Site and install telephones inside the Contractor's and the OPT's field office. 2.06 WATER FOR CONSTRUCTION A. Provide temporary water. Potable water may be purchased from the Owner by obtaining a water meter from the Owner and transporting water from a water hydrant. Non-potable water may be used for hydraulic testing of non-potable basins or pipelines. Include the cost of water in the Contract Price. B. Contractor must comply with the City of Corpus Christi's Water Conservation and Drought Contingency Plan as amended (the "Plan"). This includes implementing water conservation measures established for changing conditions. The City Engineer will provide a copy of the Plan to Contractor at the pre-construction meeting. The Contractor will keep a copy of the Plan on the Site throughout construction. 3.00 EXECUTION 3.01 LOCATION OF TEMPORARY FACILITIES A. Locate temporary facilities in areas approved by the OAR. Construct and install signs at locations approved by the OAR. Install informational signs so they are clearly visible. 3.02 PROJECT IDENTIFICATION AND SIGNS A. The Owner will furnish two Project signs to be installed by the Contractor.The signs must be installed before construction begins and will be maintained throughout the Project period by the Contractor. The locations of the signs will be determined in the field by the OAR. 3.03 TEMPORARY LIGHTING A. Provide temporary lighting inside buildings once buildings are weatherproof. B. Provide lighting that is adequate to perform Work within any space. Temporary lights may be removed once the permanent lighting is in service. Temporary Facilities and Controls 015000-3 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 C. Provide portable flood lights at any time that Work will be performed outside the structure at night. Provide adequate lighting at any location Work is being performed. 3.04 DRINKING WATER A. Provide all field offices with potable water. Provide a dispenser and cooling apparatus if bottled drinking water is provided. B. Pay for water services and maintain daily. 3.05 CONSTRUCTION FENCE A. Install and maintain a construction fence around the Site and off-site storage yards. Fence must be a minimum 6 feet high chain link construction unless shown otherwise. Provide gates with padlocks. 3.06 REMOVAL OF TEMPORARY FACILITIES A. Remove temporary buildings, sheds, and utilities at the conclusion of the Project and restore the Site to original condition or finished in accordance with the Drawings. B. Remove informational signs upon completion of construction. C. Remove Project identification signs, framing, supports, and foundations upon completion of the Project. 3.07 MAINTENANCE AND JANITORIAL SERVICE A. Provide janitorial service (sweeping/mopping)for the OPT's field office on a weekly basis or as requested. Empty trash receptacles daily or as needed. B. Maintain signs and supports in a neat, clean condition. Repair damage to structures, framings, or signs. C. Repair any damage to Work caused by placement or removal of temporary signage. D. Service, maintain, and replace, if necessary, the OPT's field office computer equipment throughout the Project as required by the OPT including replacement cartridges for all office equipment. END OF SECTION Temporary Facilities and Controls 015000-4 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 01 57 00 TEMPORARY CONTROLS 1.00 GENERAL 1.01 WORK INCLUDED A. Provide labor, materials, equipment, and incidentals necessary to construct temporary facilities to provide and maintain control over environmental conditions at the Site. Remove temporary facilities when no longer needed. B. Construct temporary impounding works, channels, diversions, furnishing and operation of pumps, installing piping and fittings, and other construction for control of conditions at the Site. Remove temporary controls at the end of the Project. C. Provide a Storm Water Pollution Prevention Plan (SWPPP) as required by Texas Pollutant Discharge Elimination System (TPDES) General Permit No.TXR150000 for stormwater discharges from construction activities. Comply with all requirements of the Texas Commission on Environmental Quality(TCEQ) and Laws and Regulations. File required legal notices and obtain required permits prior to beginning any construction activity. D. Provide labor, materials, equipment, and incidentals necessary to prevent stormwater pollution for the duration of the Project. Provide and maintain erosion and sediment control structures as required to preventive sediment and other pollutants from the Site from entering any stormwater system including open channels. Remove pollution control structures when no longer required to prevent stormwater pollution. 1.02 QUALITY ASSURANCE A. Construct and maintain temporary controls with adequate workmanship using durable materials to provide effective environmental management systems meeting the requirements of the Contract Documents and Laws and Regulations. Use materials that require minimal maintenance to prevent disruption of construction activities while providing adequate protection of the environment. B. Periodically inspect systems to determine that they are meeting the requirements of the Contract Documents. 1.03 DOCUMENT SUBMITTAL A. Provide documents requiring approval by the OPT as Shop Drawings in accordance with SECTION 0133 02 SHOP DRAWINGS. B. Provide copies of notices, records, and reports required by the Contract Documents or Laws and Regulations as Record Data in accordance with SECTION 0133 03 RECORD DATA. 1.04 STANDARDS A. Provide a SWPPP that complies with all requirements of TPDES General Permit No. TXR150000 and any other applicable Laws and Regulations. B. Perform Work to comply with the City of Corpus Christi Code of Ordinances, Part III, Chapter 14, Article X-titled "STORM WATER QUALITY MANAGEMENT PLANS" and any other applicable Laws and Regulations. Temporary Controls 015700- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 1.05 PERMITS A. Submit the following to the TCEQ and the Operator of any Municipal Separate Storm Sewer System (MS4) receiving stormwater discharges from the Site: 1. Notice of Intent (NOI) at least 48 hours prior to beginning construction activity. Construction activity may commence 24 hours after the submittal of an electronic NOI. 2. Notice of Change (NOC) letter when relevant facts or incorrect information was submitted in the NOI, or if relevant information in the NOI changes during the course of construction activity. 3. Notice of Termination (NOT)when the construction Project has been completed and stabilized. B. Post a copy of the NOI at the Site in a location where it is readily available for viewing by the general public and as required by Laws and Regulations prior to starting construction activities and maintain the posting until completion of the construction activities. C. Maintain copies of a schedule of major construction activities, inspection reports, and revision documentation with the SWPPP. 1.06 STORMWATER POLLUTION CONTROL A. Comply with the current requirements of TPDES General Permit No.TXR150000 as set forth by the TCEQ for the duration of the Project: 1. Develop a SWPPP meeting all requirements of the TPDES General Permit. 2. Submit of a Notice of Intent to the TCEQ. 3. Develop and implement appropriate Best Management Practices as established by local agencies of jurisdiction. 4. Provide all monitoring and/or sampling required for reporting to the TCEQ. 5. Submit reports to the TCEQ as required as a condition of the TPDES General Permit. 6. Submit copies of the reports to the Designer as Record Data in accordance with SECTION 0133 03 RECORD DATA. 7. Retain copies of these documents at the Site at all times for review and inspection by the OPT or regulatory agencies. Post a copy of the permit as required by Laws and Regulations. 8. Assume sole responsibility for implementing, updating, and modifying the TPDES General Permit per Laws and Regulations for the SWPPP and Best Management Practices. B. Use forms required by the TCEQ to file the Notice of Intent. Submit the Notice of Intent at least 2 days prior to the start of construction. Develop the SWPPP prior to submitting the Notice of Intent. Provide draft copies of the Notice of Intent, SWPPP, and any other pertinent TCEQ submittal documents to Owner for review prior to submittal to the TCEQ. C. Return any property disturbed by construction activities to either specified conditions or pre-construction conditions as set forth in the Contract Documents. Provide an overall erosion and sedimentation control system that will protect all undisturbed areas and soil Temporary Controls 015700-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 stockpiles/spoil areas. Implement appropriate Best Management Practices and techniques to control erosion and sedimentation and maintain these practices and techniques in effective operating condition during construction. Permanently stabilize exposed soil and fill as soon as practical during the Work. D. Assume sole responsibility for the means, methods, techniques, sequences, and procedures for furnishing, installing, and maintaining erosion and sedimentation control structures and procedures and overall compliance with the TPDES General Permit. Modify the system as required to effectively control erosion and sediment. E. Retain copies of reports required by the TPDES General Permit for 3 years from date of Final Completion. 1.07 POLLUTION CONTROL A. Prevent the contamination of soil,water, or atmosphere by the discharge of noxious substances from construction operations. Provide adequate measures to prevent the creation of noxious air-borne pollutants. Prevent dispersal of pollutants into the atmosphere. Do not dump or otherwise discharge noxious or harmful fluids into drains or sewers, nor allow noxious liquids to contaminate public waterways in any manner. B. Provide equipment and personnel and perform emergency measures necessary to contain any spillage. 1. Contain chemicals in protective areas and do not dump on soil. Dispose of such materials at off-site locations in an acceptable manner. 2. Excavate contaminated soil and dispose at an off-site location if contamination of the soil does occur. Fill resulting excavations with suitable backfill and compact to the density of the surrounding undisturbed soil. 3. Provide documentation to the Owner which states the nature and strength of the contaminant, method of disposal, and the location of the disposal site. 4. Comply with Laws and Regulations regarding the disposal of pollutants. C. Groundwater or run-off water which has come into contact with noxious chemicals, sludge, or sludge-contaminated soil is considered contaminated. Contaminated water must not be allowed to enter streams or water courses, leave the Site in a non-contained form, or enter non-contaminated areas of the Site. 1. Pump contaminated water to holding ponds constructed by the Contractor for this purpose, or discharge to areas on the interior of the Site, as designated by the OAR. 2. Construct temporary earthen dikes or take other precautions and measures as required to contain the contaminated water and pump to a designated storage area. 3. Wash any equipment used for handling contaminated water or soil within contaminated areas three times with uncontaminated water prior to using such equipment in an uncontaminated area. Dispose of wash water used to wash such equipment as contaminated water. Temporary Controls 015700-3 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 1.08 EARTH CONTROL A. Remove excess soil, spoil materials, and other earth not required for backfill at the time of generation. Control stockpiled materials to eliminate interference with Contractor and Owner's operations. B. Dispose of excess earth off the Site. Provide written approval from the property owner for soils deposited on private property. Obtain approval of the Owner if this disposal impacts the use of Site or other easements. 1.09 OZONE ADVISORY DAYS A. Do not conduct roofing, priming, or hot-mix paving operations, except for repairs, on days the City Engineer has notified Contractor that an ozone advisory is in effect. An extension of time will be allowed for each day for which priming or hot mix paving was scheduled, crews were prepared to perform this Work and the City Engineer issued ozone alert prevents this Work. Contractor will be compensated at the unit price indicated in the Bid for each day for which an extension of time was granted due to an ozone alert. 1.10 MANAGEMENT OF WATER A. Manage water resulting from rains or ground water at the Site. Maintain trenches and excavations free of water at all times. B. Lower the water table in the construction area by acceptable means if necessary to maintain a dry and workable condition at all times. Provide drains, sumps, casings, well points, and other water control devices as necessary to remove excess water. C. Provide continuous operation of water management actions. Maintain standby equipment to provide proper and continuous operation for water management. D. Ensure that water drainage does not damage adjacent property. Divert water into the same natural watercourse in which its headwaters are located, or other natural stream or waterway as approved by the Owner. Assume responsibility for the discharge of water from the Site. E. Remove the temporary construction and restore the Site in a manner acceptable to the OAR and to match surrounding material at the conclusion of the Work. 1.11 DEWATERING A. This item is considered subsidiary for all dewatering methods other than "well pointing" to the appropriate bid items as described in the Bid Form where dewatering is needed to keep the excavation dry, as approved by the Designer, and shall include all costs to provide a dry foundation for the proposed improvements. B. Storm water that enters an excavation can be pumped out as long as care is taken to minimize solids and mud entering the pump suction and flow is pumped to a location that allows for sheet flow prior to entering a storm water drainage ditch or storm water inlet. C. An alternative to sheet flow is to pump storm water to an area where ponding occurs naturally without leaving the designated work area or by a manmade berm(s) prior to Temporary Controls 015700-4 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 entering the storm water system. Sheet flow and ponding is to allow solids screening and/or settling prior to entering a storm water conduit or inlet. D. Storm water or groundwater shall not be discharged to private property without permission. It is the intent that Contractor discharges groundwater primarily into the existing storm water system, provided that the quality of groundwater is equal to or better than the receiving stream,the Corpus Christi Bay. E. Testing of groundwater quality is to be performed by the Contractor, at the Contractor's expense, prior to commencing discharge and shall be retested by the Contractor, at the Contractor's expense, a minimum of once a week. Contractor shall coordinate with the Owner on all testing. Tests will also be performed as each new area of construction is started. F. Another option for disposal of groundwater by Contractor would include pumping to the nearest sanitary sewer system. If discharging to temporary holding tanks and trucking to a sanitary sewer or wastewater plant, the costs for these operations shall be negotiated. Other groundwater disposal alternatives or solutions may be approved by the Designer on a case by case basis. G. Prior to Pumping groundwater from a trench to the sanitary sewer system the Contractor shall contact Wastewater Pre-treatment Coordinator at 826-1817 to obtain a "no cost" permit from the Owner's Waste Water Department. Contractor will pay for any water quality testing or water analysis cost required. The permit will require an estimate of groundwater flow. Groundwater flow can be estimated by boring a hole or excavating a short trench then record water level shortly after completion, allow to sit overnight, record water level again, pump hole or trench dry to a holding tank or vacuum truck then record how long it takes to fill to original level and overnight level. 1.12 DISPOSAL OF CONTAMINATED GROUNDWATER(NOT APPLICABLE) A. An allowance will be included in the Bid for the unanticipated disposal of contaminated groundwater. This allowance may not be needed but is provided in case contaminated groundwater is encountered during the course of the Project and does not meet the water quality requirements for discharge into the storm water or wastewater systems. This allowance includes all materials, tools, equipment, labor, transportation, hauling, coordination, and proper disposal of the contaminated water at an approved landfill, deep water injection well, or other site as agreed to by the Designer. Suggested disposal facilities would be US Ecology(USET) in Robstown,Texas or Texas Molecular in Corpus Christi,Texas. B. The payment for this Work will be based on the Contractor's actual costs and will be negotiated. 1.13 DISPOSAL OF HIGHLY CHLORINATED WATER A. Dispose of water used for testing, disinfection, and line flushing. Comply with Owner's requirements and Laws and Regulation regarding the disposal of contaminated water, including water with levels of chlorine, which exceed the permissible limits for discharge into wetlands or environmentally sensitive areas. Comply with the requirements of all regulatory agencies in the disposal of all water used in the Project. Include a description and details for disposal of this water in a Plan of Action per SECTION 0135 00 SPECIAL Temporary Controls 015700-5 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 PROCEDURES. Do not use the Owner's sanitary sewer system for disposal of contaminated water. 1.14 WINDSTORM CERTIFICATION A. All affected materials and installation shall comply with Texas Department of Insurance Requirements for windstorm resistant construction for design wind speed as required by IBC 2015. Contractor shall be responsible for contracting with a licensed structural engineer in the State of Texas to perform all inspections and provide documentation for windstorm certification to the Texas Board of Insurance. The Contractor shall be responsible for providing all necessary design/assembly documentation for all new windows, doors, louvers, etc. to the windstorm engineer/inspectors required to conform with the requirements of the Texas Department of Insurance. 2.00 PRODUCTS 2.01 MATERIALS A. Provide materials that comply with Laws and Regulations. 3.00 EXECUTION 3.01 CONSTRUCTING, MAINTAINING AND REMOVING TEMPORARY CONTROLS A. Construct temporary controls in accordance with Laws and Regulations. B. Maintain controls in accordance with regulatory requirements where applicable, or in accordance with the requirements of the Contract Documents. C. Remove temporary controls when no longer required, but before the Project is complete. Correct any damage or pollution that occurs as the result of removing controls while they are still required. END OF SECTION Temporary Controls 015700-6 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 01 70 00 EXECUTION AND CLOSEOUT REQUIREMENTS 1.00 GENERAL 1.01 WORK INCLUDED A. Comply with requirements of the General Conditions and specified administrative procedures in closing out the Contract. 1.02 DOCUMENT SUBMITTAL A. Submit certifications and releases on forms provided. 1.03 SUBSTANTIAL COMPLETION A. Notify the Designer that the Work or a designated portion of the Work is substantially complete per the General Conditions. Include a list of the items remaining to be completed or corrected before the Project will be considered to be complete. B. OPT will visit the Site to observe the Work within a reasonable time after notification is received to determine the status of the Project. C. Designer will notify the Contractor that the Work is either substantially complete or that additional Work must be performed before the Project will be considered substantially complete. 1. Designer will notify the Contractor of items that must be completed before the Project will be considered substantially complete. 2. Correct the noted deficiencies in the Work. 3. Notify the Designer when the items of Work in the Designer's notice have been completed. 4. OPT will revisit the Site and repeat the process. 5. Designer will issue a Certificate of Substantial Completion to the Contractor when the OPT considers the Project to be substantially complete. The Certificate will include a tentative list of items to be corrected before Final Payment will be recommended. 6. Review the list and notify the Designer of any objections to items on the list within 10 days after receiving the Certificate of Substantial Completion. 1.04 FINAL INSPECTION A. Notify the Designer when: 1. Work has been completed in compliance with the Contract Documents; 2. Equipment and systems have been tested per Contract Documents and are fully operational; 3. Final Operations and Maintenance Manuals have been provided to the Owner and all operator training has been completed; 4. Specified spare parts and special tools have been provided; and Execution and Closeout Requirements 017000- 1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 5. Work is complete and ready for final inspection. B. OPT will visit the Site to determine if the Project is complete and ready for Final Payment within a reasonable time after the notice is received. C. Designer will notify the Contractor that the Project is complete or will notify the Contractor that Work is Defective. D. Take immediate steps to correct Defective Work. Notify the Designer when Defective Work has corrected. OPT will visit the Site to determine if the Project is complete and the Work is acceptable. Designer will notify the Contractor that the Project is complete or will notify the Contractor that Work is Defective. E. Submit the Request for Final Payment with the closeout documents described in Paragraph 1.06 if notified that the Project is complete and the Work is acceptable. 1.05 REINSPECTION FEES A. Owner may impose a Set-off against the Application for Payment in accordance with the General Conditions to compensate the OPT for additional visits to the Project if additional Work is required. 1.06 CLOSEOUT DOCUMENTS SUBMITTAL A. Record Documents per SECTION 01 31 13 PROJECT COORDINATION. B. Warranties and bonds. C. Equipment installation reports on equipment. D. Shop Drawings, Record Data, and other documents as required by the Contract Documents. E. Evidence of continuing insurance and bond coverage as required by the Contract Documents. F. Final Photographs per SECTION 0133 05 VIDEO AND PHOTOGRAPHIC DOCUMENTATION. 1.07 TRANSFER OF UTILITIES A. Transfer utilities to the Owner when the Certificate of Substantial Completion has been issued and the Work has been occupied by the Owner. B. Submit final meter readings for utilities and similar data as of the date the Owner occupied the Work. 1.08 WARRANTIES, BONDS,AND SERVICES AGREEMENTS A. Provide warranties, bonds, and service agreements required by SECTION 0133 02 SHOP DRAWINGS or by the individual Specification Sections. B. The date for the start of warranties, bonds, and service agreements is established per the General Conditions. C. Compile warranties, bonds, and service agreements and review these documents for compliance with the Contract Documents. Execution and Closeout Requirements 017000-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 1. Provide a log of all equipment covered under the 1 year correction period specified in the General Conditions and all products for which special or extended warranties or guarantees are provided. Index the log by Specification Section number on forms provided. Include items 2.e through 2.g below in the tabulation. 2. Provide a copy of specific warranties or guarantees under a tab indexed to the log. Each document is to include: a. A description of the product or Work item; b. The firm name, with the name of the principal, address, and telephone number; C. Signature of the respective Supplier or Subcontractor to acknowledge existence of the warranty obligation for extended warranties and service agreements; d. Scope of warranty, bond, or services agreement; e. Indicate the start date for the correction period specified in the General Conditions for each product and the date on which the specified correction period expires. f. Indicate the start date for extended warranties for each product and the date on which the specified extended warranties period expires. g. Start date, warranty or guarantee period, and expiration date for each warranty bond and service agreement; h. Procedures to be followed in the event of a failure; and i. Specific instances that might invalidate the warranty or bond. D. Submit digital copies of the documents to the Designer for review. E. Submit warranties, bonds and services agreements within 10 days after equipment or components placed in service. 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Execution and Closeout Requirements 017000-3 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 11-25-2013 STANDARD SPECIFICATIONS SECTION 021020 SITE CLEARING AND STRIPPING 1. DESCRIPTION This specification shall govern all work necessary for clearing, grubbing and stripping of objectionable matter as required to complete the project, and shall include removing and disposing of trees, stumps, brush, roots, vegetation, rubbish and other objectionable matter from the project site. 2. CONSTRUCTION METHODS The site shall be cleared of all trees, stumps, brush, roots, vegetation, rubbish and other objectionable matter as indicated on the drawings and/or as directed by the Engineer or his designated representative. Tree stumps and roots shall be grubbed to a minimum depth of 2 feet below natural ground or 2 feet below base of subgrade, whichever is lower. Areas that underlie compacted backfill shall be stripped of all vegetation, humus and other objectionable matter encountered within the top six (6) inches of the soil. All material removed from the site under this operation shall become the Contractor's responsibility. The material shall be disposed of either at a disposal site indicated on the drawings or at a disposal site obtained by the Contractor. 3. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, site clearing and stripping or clear right-of-way shall be measured by the acre. Payment shall be full compensation for all labor, equipment, tools and incidentals necessary for removing,handling, and disposing of objectionable matter from the site as indicated above. 021020 Page 1 of 1 Rev.10-30-2014 SECTION 021040 SITE GRADING 1. DESCRIPTION This specification shall govern all work necessary for backfill and grading of the site to complete the project. 2. CONSTRUCTION METHODS Prior to site grading, the site shall be cleared in accordance with City Standard Specification Section 021020 "Site Clearing and Stripping". Unless specified otherwise on the drawings, the existing surface shall be loosened by scarifying or plowing to a depth of not less than six(6)inches. The loosened material shall be recompacted with fill required to bring the site to the required grades and elevations indicated on the plans. Fill shall be uniform as to material, density and moisture content. Fill shall be free of large clods, large rocks, organic matter, and other objectionable material. No fill that is placed by dumping in a pile or windrow shall be incorporated into a layer in that position; all such piles and windrows shall be moved by blading or similar method. All fill shall be placed in layers approximately parallel to the finish grade in layers not to exceed six (6) inches of uncompacted depth, unless indicated otherwise on drawings. The fill shall be compacted to a density which approximates that of natural ground unless indicated otherwise on drawings. The Engineer may order proof rolling to test the uniformity of compaction. All irregularities, depressions and soft spots that develop shall be corrected by the Contractor. Excess material from excavation, which is not incorporated into the site as fill, shall be become property of the Contractor and disposed of away from the job site, unless indicated otherwise on the drawings. 3. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, site grading shall not be measured for pay,but shall be considered subsidiary to other work. 021040 Page 1 of 1 Rev.10-30-2014 SECTION 021080 REMOVING ABANDONED STRUCTURES 1. DESCRIPTION This specification shall provide for the demolition,removal and disposal of abandoned structures or portions of abandoned structures, as noted on the drawings, and shall include all excavation and backfilling necessary to complete the removal. The work shall be done in accordance with the provisions of these specifications. 2. METHOD OF REMOVAL Culverts or Sewers. Pipe shall be removed by careful excavation of all dirt on top and the sides in such manner that the pipe will not be damaged. Removal of sewer appurtenances shall be included for removal with the pipe. Those pipes which are deemed unsatisfactory for reuse by the Engineer may be removed in any manner the Contractor may select. Concrete Structures. Unwanted concrete structures or concrete portions of structures shall be removed to the lines and dimensions shown on the drawings, and these materials shall be disposed of as shown on the drawings or as directed by the Engineer. Any portion of the existing structure outside of the limits designated for removal which is damaged by the Contractor's operations shall be restored to its original condition at the Contractor's entire expense. Explosives shall not be used in the removal of portions of the existing structure unless approved by the Engineer, in writing. Portions of the abandoned structure shall be removed to the lines and dimensions shown on the plans, and these materials shall be disposed of as shown on the drawings or as directed by the Engineer. Any portion of the existing structure, outside of the limits designated for removal, damaged during the operations of the Contractor, shall be restored to its original condition entirely at the Contractor's expense. Explosives shall not be used in the removal of portions of the existing structure unless approved by the Engineer, in writing. Concrete portions of structures below the permanent ground line, which will not interfere in any manner with the proposed construction, may be left in place, but removal shall be carried at least five (5) feet below the permanent ground line and neatly squared off. Reinforcement shall be cut off close to the concrete. Steel Structures. Steel structures or steel portions of structures shall be dismantled in sections as determined by the Engineer. The sections shall be stored if the members are to be salvaged and reused. Rivets and bolts connecting steel railing members, steel beams of beam spans and steel stringers of truss spans, shall be removed by butting the heads with a "cold cut" and punching or drilling from the hole, or by such other method that will not injure the members for re-use and will meet the approval of the Engineer. The removal of rivets and bolts from connections of truss 021080 Page 1 of 3 Rev.10-30-2014 members, bracing members, and other similar members in the structure will not be required unless specifically called for on the plans or special provisions, and the Contractor shall have the option of dismantling these members by flame-cutting the members immediately adjacent to the connections. Flame-cutting will not be permitted, however, when the plans or special provisions call for the structure unit to be salvaged in such manner as to permit re-erection. In such case, all members shall be carefully matchmarked with paint in accordance with diagrams furnished by the Engineer prior to dismantling, and all rivets and bolts shall be removed from the connections in the manner specified in the first portion of this paragraph. Timber Structures. Timber structures or timber portions of structures to be reused shall be removed in such manner as to damage the timber for further use as little as possible. All bolts and nails shall be removed from such lumber as deemed salvable by the Engineer. Unless otherwise specified on the drawings, timber piles shall be either pulled or cut off at the point not less than five (5) feet below ground line, with the choice between these two methods resting with the Contractor,unless otherwise specified. Brick or Stone Structures. Unwanted brick or stone structures or stone portions of structures shall be removed. Portions of such structures below the permanent ground line, which will not in any manner interfere with the proposed construction, may be left in place, but removal shall be carried at least five(5)feet below the permanent ground line and neatly squared off. Salvage. All material such as pipe, timbers,railings, etc.,which the Engineer deems as salvable for reuse, and all salvaged structural steel, shall be delivered to a designated storage area. Materials, other than structural steel, which are not deemed salvable by the Engineer, shall become the property of the Contractor and shall be removed to suitable disposal sites off of the right-of-way arranged for by the Contractor, or otherwise disposed of in a manner satisfactory to the Engineer. Where temporary structures are necessary for a detour adjacent to the present structure, the Contractor will be permitted to use the material in the old structure for the detour structure, but he shall dismantle and stack or dispose of the material as required above as soon as the new structure is opened for traffic. Backfill. All excavations made in connection with this specification and all openings below the natural ground line caused by the removal of abandoned structures or portions thereof shall be backfilled to the level of the original ground line, unless otherwise provided on the drawings. Backfill in accordance with applicable requirements of Sections 022020 "Excavation and Backfill for Utilities" and 022080 "Embankment". All open ends of abandoned pipe or other structures shall be filled or plugged as specified. That portion of the backfill which will support any portion of the roadbed, embankment, levee, or other structural feature shall be placed in layers of the same depth as those required for placing 021080 Page 2 of 3 Rev.10-30-2014 embankment, maximum 10" loose lifts unless otherwise specified. Material in each layer shall be wetted uniformly, if required, and shall be compacted to a minimum of 95% Standard Proctor density, unless otherwise specified. In places inaccessible to blading and rolling equipment, mechanical or hand tamps or rammers shall be used to obtain the required compaction. That portion of the backfill which will not support any portion of the roadbed, embankment, or other structural feature shall be placed as directed by the Engineer in such manner and to such state of compaction as will preclude objectionable amount of settlement, maximum 10" loose lifts to minimum 95% Standard Proctor density unless otherwise specified. 3. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, the work governed by this specification shall not be measured for pay,but shall be subsidiary to the project. 021080 Page 3of3 Rev.10-30-2014 SECTION 022020 EXCAVATION AND BACKFILL FOR UTILITIES 1. DESCRIPTION This specification shall govern all work for excavation and backfill for utilities required to complete the project. 2. CONSTRUCTION (1) Unless otherwise specified on the drawings or permitted by the Engineer, all pipe and conduit shall be constructed in open cut trenches with vertical sides. Trenches shall be sheathed and braced as necessary throughout the construction period. Sheathing and bracing shall be the responsibility of the Contractor (refer to Section 022022 "Trench Safety for Excavations" of the City Standard Specifications). Trenches shall have a maximum width of one foot beyond the horizontal projection of the outside surfaces of the pipe and parallel thereto on each side unless otherwise specified. The Contractor shall not have more than 200 feet of open trench left behind the trenching operation and no more than 500 feet of ditch behind the ditching machine that is not compacted as required by the plans and specifications. No trench or excavation shall remain open after working hours. For all utility conduit and sewer pipe to be constructed in fill above natural ground, the embankment shall first be constructed to an elevation not less than one foot above the top of the pipe or conduit, after which excavation for the pipe or conduit shall be made. If quicksand, muck, or similar unstable material is encountered during the excavation, the following procedure shall be used unless other methods are called for on the drawings. If the unstable condition is a result of ground water,the Contractor,prior to additional excavation, shall control it. After stable conditions have been achieved,unstable soil shall be removed or stabilized to a depth of 2 feet below the bottom of pipe for pipes 2 feet or more in height;and to a depth equal to the height of pipe, 6 inches minimum,for pipes less then 2 feet in height. Such excavation shall be carried at least one foot beyond the horizontal limits of the structure on all sides. All unstable soil so removed shall be replaced with suitable stable material, placed in uniform layers of suitable depth as directed by the Engineer,and each layer shall be wetted, if necessary, and compacted by mechanical tamping as required to provide a stable condition. For unstable trench conditions requiring outside forms, seals, sheathing and bracing, any additional excavation and backfill required shall be done at the Contractor's expense. (2) Shaping of Trench Bottom. The trench bottom shall be undercut a minimum depth sufficient to accommodate the class of bedding indicated on the plans and specifications. 022020 Page 1 of 4 Rev.3-25-2015 (3) Dewatering Trench. Pipe or conduit shall not be constructed or laid in a trench in the presence of water. All water shall be removed from the trench sufficiently prior to the pipe or conduit planing operation to insure a relatively dry (no standing water), firm bed. The trench shall be maintained in such dewatered condition until the trench has been backfilled to a height at lease one foot above the top of pipe. Removal of water may be accomplished by bailing,pumping, or by installation of well-points, as conditions warrant. Removal of well- points shall be at rate of 1/3 per 24 hours (every third well-point). The Contractor shall prevent groundwater from trench or excavation dewatering operations from discharging directly into the storm water system. Groundwater from dewatering operations shall be sampled and tested, if applicable, and disposed of, in accordance with City Standard Specification Section 022021 "Control of Ground Water". (4) Excavation in Streets. Excavation in streets,together with the maintenance of traffic where specified, and the restoration of the pavement riding surface, shall be in accordance with drawing detail or as required by other applicable specifications. (5) Removing Abandoned Structures. When abandoned masonry structures or foundations are encountered in the excavation, such obstructions shall be removed for the full width of the trench and to a depth one foot below the bottom of the trench. When abandoned inlets or manholes are encountered and no plan provision is made for adjustment or connection to the new utility,such manholes and inlets shall be removed completely to a depth one foot below the bottom of the trench. In each instance,the bottom to the trench shall be restored to grade by backfilling and compacting by the methods provided hereinafter for backfill. Where the trench cuts through utility lines which are known to be abandoned, these lines shall be cut flush with the sides of the trench and blocked with a concrete plug in a manner satisfactory to the Engineer. (6) Protection of Utilities. The Contractor shall conduct his work such that a reasonable minimum of disturbance to existing utilities will result. Particular care shall be exercised to avoid the cutting or breakage of water and gas lines. Such lines,if broken, shall be restored promptly by the Contractor. When active wastewater lines are cut in the trenching operations, temporary flumes shall be provided across the trench while open, and the lines shall be restored when the backfilling has progressed to the original bedding line of the sewer so cut. The Contractor shall inform utility owners sufficiently in advance of the Contractor's operations to enable such utility owners to reroute, provide temporary detours, or to make other adjustments to utility lines in order that the Contractor may proceed with his work with a minimum of delay. The Contractor shall not hold the City liable for any expense due to delay or additional work because of utility adjustments or conflicts. (7) Excess Excavated Material. All materials from excavation not required for backfilling the trench shall be removed by the Contractor from the job site promptly following the completion of work involved. 022020 Page 2 of 4 Rev.3-25-2015 (8) Backfill A. Backfill Procedure Around Pipe (Initial Backfill) All trenches and excavation shall be backfilled as soon as is practical after the pipes or conduits are properly laid. In addition to the specified pipe bedding material, the backfill around the pipe as applicable shall be granular material as shown on the standard details or as described in the applicable specification section, and shall be free of large hard lumps or other debris. If indicated on the plans, pipe shall be encased with cement-stabilized sand backfill as described below. The backfill shall be deposited in the trench simultaneously on both sides of the pipe for the full width of the trench,in layers not to exceed ten(10)inches (loose measurement), wetted if required to obtain proper compaction, and thoroughly compacted by use of mechanical tampers to a density comparable to the adjacent undisturbed soil or as otherwise specified on the plans,but not less than 95%Standard Proctor density. A thoroughly compacted material shall be in place between the external wall of the pipe and the undisturbed sides of the trench and to a level twelve (12) inches above the top of the pipe. B. Backfill Over One Foot Above Pipe (Final Backfill) UNPAVED AREAS: The backfill for that portion of trench over one(1)foot above the pipe or conduit not located under pavements (including waterlines, gravity wastewater lines, wastewater force mains and reinforced concrete storm water pipe) shall be imported select material or clean, excess material from the excavation meeting the following requirements: Free of hard lumps, rock fragments, or other debris, No clay lumps greater than 2" diameter Moisture Content: +/-3% Backfill material shall be placed in layers not more than ten (10) inches in depth (loose measurement),wetted if required to obtain proper compaction,and thoroughly compacted by use of mechanical tampers to the natural bank density but not less than 95%Standard Proctor density,unless otherwise indicated. Flooding of backfill is not allowed. Jetting of backfill may only be allowed in sandy soils and in soils otherwise approved by the Engineer. Regardless of backfill method, no lift shall exceed 10 inches and density shall not be less than 95% Standard Proctor density. A period of not less than twenty-four(24)hours shall elapse between the time of jetting and the placing of the top four (4) feet of backfill. If jetting is used, the top four (4) feet of backfill shall be placed in layers not more than 10 inches in depth (loose measurement), wetted if required to obtain proper compaction, and thoroughly compacted by use of mechanical tampers to the natural bank density but not less than 95% Standard Proctor density(ASTM D698). PAVED AREAS: At utility line crossings under pavements (including waterlines, gravity wastewater lines, wastewater force mains, and reinforced concrete storm water pipe), and where otherwise indicated on the drawings, trenches shall be backfilled as shown below: From top of initial backfill(typically twelve (12) inches above top of the pipe) to three (3) feet below bottom of road base course, backfill shall be select material meeting the requirements of 022100 "Select Material". 022020 Page 3 of 4 Rev.3-25-2015 Asphalt Roadways The upper three (3) feet of trench below the road base course shall be backfilled to the bottom of the road base course with cement-stabilized sand containing a minimum of 2 sacks of Standard Type I Portland cement per cubic yard of sand and compacted to not less than 95% Standard Proctor density. Concrete Roadways The Contractor may elect to backfill the upper three (3) feet of trench below the road base course with cement stabilized sand as noted above, or in the case of storm water pipe or box installation the Contractor may backfill and compact select material to 98% Standard Proctor density(ASTM D698)following City Standard Specification Section 022100. 3. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, excavation and backfill for utilities, including select material or cement-stabilized sand backfill,shall not be measured and paid for separately. It shall be considered subsidiary to the items for which the excavation and backfill is required. 022020 Page 4 of 4 Rev.3-25-2015 SECTION 022021 CONTROL OF GROUND WATER 1. GENERAL 1.1 SECTION INCLUDES A. Dewatering, depressurizing, draining, and maintaining trenches, shaft excavations, structural excavations, and foundation beds in a stable condition, and controlling ground water conditions for tunnel excavations. B. Protection of excavations and trenches from surface runoff. C. Disposing of removed ground water by approved methods. 1.2 REFERENCES A. ASTM D 698 - Test Methods for Moisture-Density Relations of Soils and Soil-Aggregate Mixtures, Using 5.5-1b (2.49 kg) Rammer and 12-inch (304.8 mm) Drop. B. Federal Regulations, 29 CFR Part 1926, Standards-Excavation, Occupational Safety and Health Administration(OSHA). C. Federal Register 40 CFR (Vol. 55,No. 222)Part 122, EPA Administered Permit Programs (NPDES), Para.122.26(b)(14) Storm Water Discharge. 1.3 DEFINITIONS A. Ground water control includes both dewatering and depressurization of water-bearing soil layers. 1. Dewatering includes lowering the water table and intercepting seepage which would otherwise emerge from slopes or bottoms of excavations, or into tunnels and shafts, and disposing of removed ground water by approved methods. The intent of dewatering is to increase the stability of tunnel excavations and excavated slopes;prevent dislocation of material from slopes or bottoms of excavations; reduce lateral loads on sheeting and bracing; improve excavating and hauling characteristics of excavated material;prevent failure or heaving of the bottom of excavations; and to provide suitable conditions for placement of backfill materials and construction of structures,piping and other installations. 2. Depressurization includes reduction in piezometric pressure within strata not controlled by dewatering alone, as required to prevent failure or heaving of excavation bottom or instability of tunnel excavations. B. Excavation drainage includes keeping excavations free of surface and seepage water. 022021 Page 1 of 10 Rev.10-30-2014 C. Surface drainage includes the use of temporary drainage ditches and dikes and installation of temporary culverts and sump pumps with discharge lines as required to protect the Work from any source of surface water. D. Equipment and instrumentation for monitoring and control of the ground water control system includes piezometers and monitoring wells, and devices, such as flow meters, for observing and recording flow rates. 1.4 PERFORMANCE REQUIREMENTS A. Conduct subsurface investigations as needed to identify ground water conditions and to provide parameters for design, installation, and operation of ground water control systems. B. Design a ground water control system, compatible with requirements of Federal Regulations 29 CFR Part 1926 and City Standard Specification Section 022022 - Trench Safety for Excavations, to produce the following results: 1. Effectively reduce the hydrostatic pressure affecting: a) Excavations (including utility trenches); b) Tunnel excavation, face stability or seepage into tunnels. 2. Develop a substantially dry and stable subgrade for subsequent construction operations. 3. Preclude damage to adjacent properties, buildings, structures, utilities, installed facilities, and other work. 4. Prevent the loss of fines, seepage, boils, quick condition, or softening of the foundation strata. 5. Maintain stability of sides and bottom of excavations. C. Provide ground water control systems which may include single-stage or multiple-stage well point systems, eductor and ejector-type systems, deep wells, or combinations of these equipment types. D. Provide drainage of seepage water and surface water, as well as water from any other source entering the excavation. Excavation drainage may include placement of drainage materials, such as crushed stone and filter fabric, together with sump pumping. E. Provide ditches, berms,pumps and other methods necessary to divert and drain surface water away from excavations. F. Locate ground water control and drainage systems so as not to interfere with utilities, construction operations, adjacent properties, or adjacent water wells. 022021 Page 2 of 10 Rev.10-30-2014 G. Assume sole responsibility for ground water control systems and for any loss or damage resulting from partial or complete failure of protective measures, and any settlement or resultant damage caused by the ground water control operations. Modify ground water control systems or operations if they cause or threaten to cause damage to new construction, existing site improvements, adjacent property, or adjacent water wells, or affect potentially contaminated areas. Repair damage caused by ground water control systems or resulting from failure of the system to protect property as required. H. Provide an adequate number of piezometers installed at the proper locations and depths as required to provide meaningful observations of the conditions affecting the excavation, adjacent structures, and water wells. L Provide environmental monitoring wells installed at the proper locations and depths as required to provide adequate observations of hydrostatic conditions and possible contaminant transport from contamination sources into the work area or into the ground water control system. J. Decommission piezometers and monitoring wells installed during design phase studies and left for Contractors monitoring and use, if applicable. 1.5 ENVIRONMENTAL REQUIREMENTS A. Comply with requirements of agencies having jurisdiction. B. Comply with Texas Commission on Environmental Quality(TCEQ)regulations and Texas Water Well Drillers Association for development, drilling, and abandonment of wells used in dewatering system. C. Prior to beginning construction activities, file Notice of Intent(NOI) for Storm Water Discharges Associated with Construction Activity under the Texas Pollutant Elimination System (TPDES) General Permit No. TXR150000, administered by the Texas Commission on Environmental Quality(TCEQ). The general permit falls under the provisions of Section 402 of the Clean Water Act and Chapter 26 of the Texas Water Code. D. Prepare submittal form and submit to TCEQ along with application fee. E. Upon completion of construction, file Notice of Termination (NOT) for Storm Water Discharges Associated with Construction Activity under the TPDES General Permit with the TCEQ. F. Obtain all necessary permits from agencies with control over the use of ground water and matters affecting well installation, water discharge, and use of existing storm drains and natural water sources. Because the review and permitting process may be lengthy, take early action to pursue and submit for the required approvals. G. Monitor ground water discharge for contamination while performing pumping in the vicinity of potentially contaminated sites. 022021 Page 3 of 10 Rev.10-30-2014 H. Conduct sampling and testing of ground water and receiving waters as outlined in Article 3 below. 2. PRODUCTS 2.1 EQUIPMENT AND MATERIALS A. Equipment and materials are at the option of Contractor as necessary to achieve desired results for dewatering. B. Eductors, well points, or deep wells, where used, shall be furnished, installed and operated by an experienced contractor regularly engaged in ground water control system design, installation, and operation. C. All equipment must be in good repair and operating order. D. Sufficient standby equipment and materials shall be kept available to ensure continuous operation, where required. 3. EXECUTION 3.1 GROUND WATER CONTROL A. Perform a subsurface investigation by borings as necessary to identify water bearing layers, piezometric pressures, and soil parameters for design and installation of ground water control systems. Perform pump tests, if necessary to determine the drawdown characteristics of the water bearing layers. B. Provide labor, material, equipment, techniques and methods to lower, control and handle ground water in a manner compatible with construction methods and site conditions. Monitor effectiveness of the installed system and its effect on adjacent property. C. Install, operate, and maintain ground water control systems in accordance with the ground water control system design. Notify the City's Construction Inspector in writing of any changes made to accommodate field conditions and changes to the Work. Revise the ground water control system design to reflect field changes. D. Provide for continuous system operation, including nights, weekends, and holidays. Arrange for appropriate backup if electrical power is primary energy source for dewatering system. E. Monitor operations to verify that the system lowers ground water piezometric levels at a rate required to maintain a dry excavation resulting in a stable subgrade for prosecution of subsequent operations. F. Where hydrostatic pressures in confined water bearing layers exist below excavation, depressurize those zones to eliminate risk of uplift or other instability of excavation or installed 022021 Page 4 of 10 Rev.10-30-2014 works. Allowable piezometric elevations shall be defined in the ground water control system design. G. Remove ground water control installations. 1. Remove pumping system components and piping when ground water control is no longer required. 2. Remove piezometers and monitoring wells when directed by the City Engineer. 3. Grout abandoned well and piezometer holes. Fill piping that is not removed with cement- bentonite grout or cement-sand grout. H. During backfilling, dewatering may be reduced to maintain water level a minimum of 5 feet below prevailing level of backfill. However, do not allow that water level to result in uplift pressures in excess of 80 percent of downward pressure produced by weight of structure or backfill in place. Do not allow water levels to rise into cement stabilized sand until at least 48 hour after placement. L Provide a uniform diameter for each pipe drain run constructed for dewatering. Remove pipe drain when it has served its purpose. If removal of pipe is impractical,provide grout connections at 50-foot intervals and fill pipe with cement-bentonite grout or cement-sand grout when pipe is removed from service. J. Extent of construction ground water control for structures with a permanent perforated underground drainage system may be reduced, such as for units designed to withstand hydrostatic uplift pressure. Provide a means for draining the affected portion of underground system, including standby equipment. Maintain drainage system during operations and remove it when no longer required. K. Remove system upon completion of construction or when dewatering and control of surface or ground water is no longer required. L. In unpaved areas, compact backfill to not less than 95 percent of Standard Proctor maximum dry density in accordance with ASTM D 698. In paved areas (or areas to receive paving), compact backfill to not less than 98 percent of Standard Proctor maximum dry density in accordance with ASTM D 698. 3.2 REQUIREMENTS FOR EDUCTOR, WELL POINTS, OR DEEP WELLS A. For above ground piping in ground water control system, include a 12-inch minimum length of clear, transparent piping between every eductor well or well point and discharge header so that discharge from each installation can be visually monitored. B. Install sufficient piezometers or monitoring wells to show that all trench or shaft excavations in water bearing materials are pre-drained prior to excavation. Provide separate piezometers for 022021 Page 5 of 10 Rev.10-30-2014 monitoring of dewatering and for monitoring of depressurization. Install piezometers and monitoring wells for tunneling as appropriate for Contractor's selected method of work. C. Install piezometers or monitoring wells not less than one week in advance of beginning the associated excavation (including trenching). D. Dewatering may be omitted for portions of underdrains or other excavations, but only where auger borings and piezometers or monitoring wells show that soil is pre-drained by an existing system such that the criteria of the ground water control system design are satisfied. E. Replace installations that produce noticeable amounts of sediments after development. F. Provide additional ground water control installations, or change the methods, in the event that the installations according to the ground water control system design do not provide satisfactory results based on the performance criteria defined by the ground water control system design and by these specifications. 3.3 EXCAVATION DRAINAGE A. Contractor may use excavation drainage methods if necessary to achieve well drained conditions. The excavation drainage may consist of a layer of crushed stone and filter fabric, and sump pumping in combination with sufficient wells for ground water control to maintain stable excavation and backfill conditions. 3.4 MAINTENANCE AND OBSERVATION A. Conduct daily maintenance and observation of piezometers or monitoring wells while the ground water control installations or excavation drainage are operating in an area or seepage into tunnel is occurring. Keep system in good condition. B. Replace damaged and destroyed piezometers or monitoring wells with new piezometers or wells as necessary to meet observation schedule. C. Cut off piezometers or monitoring wells in excavation areas where piping is exposed, only as necessary to perform observation as excavation proceeds. Continue to maintain and make observations, as specified. D. Remove and grout piezometers inside or outside the excavation area when ground water control operations are complete. Remove and grout monitoring wells when directed by the City Engineer. 3.5 MONITORING AND RECORDING A. Monitor and record average flow rate of operation for each deep well, or for each wellpoint or eductor header used in dewatering system. Also monitor and record water level and ground water recovery. These records shall be obtained daily until steady conditions are achieved, and twice weekly thereafter. 022021 Page 6 of 10 Rev.10-30-2014 B. Observe and record elevation of water level daily as long as ground water control system is in operation, and weekly thereafter until the Work is completed or piezometers or wells are removed, except when City Engineer determines that more frequent monitoring and recording are required. Comply with Construction Inspector's direction for increased monitoring and recording and take measures as necessary to ensure effective dewatering for intended purpose. 3.6 SAMPLING, TESTING AND DISPOSAL OF GROUND WATER A. It is the intent that the Contractor discharge groundwater primarily into the existing storm water system in accordance with City Ordinance, Article XVI, Section 55-203, only if the groundwater is uncontaminated and the quality of the ground water is equal to or better than the quality of the receiving stream. B. The Contractor shall prevent ground water from trench or excavation dewatering operations from discharging directly into the storm water system prior to testing and authorization. Ground water from dewatering operations shall be sampled and tested, and disposed of by approved methods. C. Laboratory analysis of groundwater and receiving water quality is to be performed by the Contractor at the Contractor's expense,prior to commencing discharge, and groundwater analysis shall be performed by the Contractor at a minimum of once per week. Contractor shall coordinate with the City Storm Water Department on all laboratory analysis. Laboratory analysis of groundwater shall also be performed at each new area of construction prior to discharge from that location. D. Sample containers, holding times,preservation methods, and analytical methods, shall either follow the requirements in 40 CFR Part 136 (as amended), or the latest edition of"Standard Methods for the Examination of Water and Wastewater." Any laboratory providing analysis must be accredited or certified by the Texas Commission on Environmental Quality according to Title 30 Texas Administrative Code (30 TAC) Chapters 25 for the matrices, methods, and parameters of analysis, if available, or be exempt according to 30 TAC §25.6. E. Analysis of the ground water discharge shall show it to be equal to or better than the quality of the first natural body of receiving water. This requires testing of both the receiving water and a sample of the ground water. All parts of this procedure shall be complete prior to any discharge of ground water to the storm water system. F. Steps to Determine Legitimate Discharge: 1. Identify the First Receiving Water. a) When the first body of water is a fresh water system(Nueces River or Oso Creek), the analysis typically fails because the local ground water will likely be too high in Total Dissolved Solids (TDS). In the case of a perched aquifer, the ground water may turn out fairly fresh, but local experience shows this to be unlikely. b) If the receiving water is a marine environment,proceed with Step 2 below to compare the ground water quality to receiving water quality. 022021 Page 7 of 10 Rev.10-30-2014 2. Compare Ground Water Discharge Quality to Receiving Water Quality. The following table, Ground Water Discharge Limits, indicates that the parameters to compare to the receiving water are Total Dissolved Solids (TDS) and Total Suspended Solids (TSS). If the ground water results are equal to or better than the receiving water, then the discharge may be authorized as long as the discharge does not exceed the other parameters which would indicate hydrocarbon contamination. Note that the receiving water only needs to be tested initially as a baseline and the ground water shall be tested weekly to ensure compliance. GROUND WATER DISCHARGE LIMITS Ground Receiving Water Water Monitoring Monitoring Maximum Parameter Frequency Frequency Limitation Total Dissolved Once Prior to Solids (TDS) Initial+Weekly Discharge < Receiving Water Total Suspended Once Prior to Solids (TSS) Initial+Weekly Discharge < Receiving Water Total Petroleum Hydrocarbons Initial +Weekly 15 mg/L Total Lead Initial+Weekly 0.1 mg/L Benzene Initial+Weekly 0.005 mg/L Total BTEX Initial+Weekly 0.1 mg/L Polynuclear Aromatic Hydrocarbons Initial +Monthly 0.01 m /L 3. Analyze Ground Water for Hydrocarbon Contamination. All other parameters listed on the Ground Water Discharge Limits table must be analyzed prior to ground water discharge to the storm water system. If no limits are exceeded, ground water discharge to the storm water system may be authorized following notification to the MS4 operator(City of Corpus Christi) and all Pollution Prevention Measures for the project are in place. Analytical results shall be on-site or readily available for review by local, state or federal inspectors. Note that this step is frequently done simultaneously with Step 2 above to shorten analytical processing time. 4. Pollution Prevention Measures. A storm water pollution prevention plan or pollution control plan shall be developed and implemented prior to any ground water discharges to the storm water system. The plan's objectives are to limit erosion and scour of the storm water system, and minimize Total Suspended Solids (TSS) and other forms of contamination, and prevent any damage to the storm water system. Note that ground water discharges must cease immediately upon the first recognition of contamination, either by sensory or analytical methods. If the discharge of groundwater results in any damages to the storm water system, the responsible party 022021 Page 8 of 10 Rev.10-30-2014 shall remediate any damage to the storm water system and the environment to the satisfaction of the Storm Water Department and/or any State or Federal Regulatory Agency. 5. MS4 Operator Notification. The MS4 operator shall be notified prior to ground water discharge to the storm water system. Contractor shall contact the designated City MS4 representative to request authorization to discharge ground water to the storm water system. Notification shall include: Project Name: Responsible Party: Discharge Location: Receiving Water: Estimated Time of Discharge: Linear Project: Yes/No Pollution Prevention Measures Implemented: Statement indicating all sampling and testing has been conducted and meets the requirements of a legitimate discharge. G. Discharges to Wastewater System In the event that the groundwater does not equal or exceed the receiving water quality, an alternative disposal option would include pumping to the nearest sanitary sewer system. Discharge to the sanitary sewer system requires a permit from the Wastewater Department. If discharging to temporary holding tanks and trucking to a sanitary sewer or wastewater treatment plant, the costs for these operations shall be negotiated. Contractor shall contact the Pretreatment Group for City Utility Operations to obtain a Wastewater Discharge Permit Application for authorization to discharge to the wastewater system. Authorization approval will include review of laboratory analysis of the ground water and estimated flow data. Note that groundwater discharges must cease immediately upon the first recognition of contamination, either by sensory or analytical methods. If the discharge of groundwater results in any damages to the wastewater collection system or wastewater overflows, the responsible party shall remediate any damage to the wastewater collection system and the environment to the satisfaction of the Wastewater Department and/or any State or Federal Regulatory Agency. H. Other groundwater disposal alternatives or solutions may be approved by the Engineer on a case by case basis. 3.7 SURFACE WATER CONTROL A. Intercept surface water and divert it away from excavations through the use of dikes, ditches, curb walls,pipes, sumps or other approved means. B. Divert surface water into sumps and pump into drainage channels or storm drains, when 022021 Page 9 of 10 Rev.10-30-2014 approved by the City Engineer. Provide settling basins when required by the City Engineer. C. Storm water that enters the excavation can be pumped out as long as care is taken to minimize solids and mud entering the pump suction and flow is pumped to a location that allows for sheet flow prior to entering a storm water drainage ditch or storm water inlet. An alternative to sheet flow is to pump storm water to an area where ponding occurs naturally without leaving the designated work area or by manmade berm(s)prior to entering the storm water system. Sheet flow and ponding is required to allow solids screening and/or settling prior to entering the storm water system. Storm water or groundwater shall not be discharged to private property. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, control of ground water will not be measured and paid for separately, but shall be considered subsidiary to other bid items. 022021 Page 10 of 10 Rev.10-30-2014 SECTION 022022 TRENCH SAFETY FOR EXCAVATIONS 1. DESCRIPTION This specification shall govern all work for providing for worker safety in excavations and trenching operations required to complete the project. 2. REQUIREMENTS Worker Safety in excavations and trenches shall be provided by the Contractor in accordance with Occupational Safety and Health Administration (OSHA) Standards, 29 CFR Part 1926 Subpart P - Excavations. It is the sole responsibility of the Contractor, and not the City or Engineer or Consultant, to determine and monitor the specific applicability of a safety system to the field conditions to be encountered on the job site during the project. The Contractor shall indemnify and hold harmless the City and Engineer and Consultant from all damages and costs that may result from failure of methods or equipment used by the Contractor to provide for worker safety. Trenches, as used herein, shall apply to any excavation into which structures, utilities, or sewers are placed regardless of depth. Trench Safety Plan, as used herein, shall apply to all methods and materials used to provide for worker safety in excavation and trenching operations required during the project. 3. MEASUREMENT AND PAYMENT Measurement of Trench Safety shall be by the linear foot of trench, regardless of depth. Measurement shall be taken along the centerline of the trench. Measurement for Excavation Safety for Utility Structures shall be per each excavation. Excavations include, but are not limited to, those for manholes, vaults, pits and other such structures that are incidental to utility work. Measurement for Excavation Safety for Special Structures shall be per each excavation or by the lump sum for each special structure identified in the Proposal. Payment shall be at the unit price bid and shall fully compensate the Contractor for all work, equipment, materials,personnel, and incidentals as required to provide for worker safety in trenches and excavations for the project. Revision current for Texas Code Chapter 756 Subchapter C. Trench Safety. 022022 Page 1 of 1 Rev.10-30-2014 SECTION 022040 STREET EXCAVATION 1. DESCRIPTION This specification shall govern all work for Street Excavation required to complete the project. 2. CONSTRUCTION METHODS (A) Stripping and Excavation Strip the top 6 inches in all areas to underlay compacted fill, curbs, base or pavement, by removing all humus, vegetation and other unsuitable materials. Unless otherwise noted, remove existing trees, shrubs, fences, curb, gutter, sidewalk, drives, paving, pipe and structures and other items within the graded area which interfere with new construction of finished grading. All suitable excavated materials shall be utilized, insofar as practicable, in constructing the required roadway sections or in uniformly widening embankments, flattening slopes, etc., as directed by the Engineer, provided that the material meets the requirements for roadway embankment as specified in Article 3 below. Unwanted or unsuitable roadway excavation and roadway excavation in excess of that needed for construction shall become the property of the Contractor to be disposed of by him outside the limits of the right-of-way at a location suitable to the Engineer. "Unsuitable" material encountered below subgrade elevation in roadway cuts, when declared unwanted by the Engineer, shall be replaced as directed by the Engineer with suitable material from the roadway excavation or with other suitable material. Maintain moisture and density until covered and protected by the subbase or base course. Remove soft or wet areas found at any time, replace with suitable material, and recompact(especially utility trenches). (B) Subgrade Preparation That area shown on the drawings for street construction shall be cut to grade, scarified to a depth not less than 6 inches, or as otherwise indicated on the drawings, and compacted to 95% Standard Proctor density (ASTM D698) to within 0 to +3% of optimum moisture. The section may be accepted if no more than 1 in 5 of the most recent moisture or density tests is beyond±1%deviation from the required moisture or density requirement. Irregularities exceeding 1/2 inch in 16 feet shall be corrected. Soft areas found at anytime shall be removed, replaced with suitable material and compacted (especially at utility trenches). The correct moisture density relationship shall be maintained until the subgrade is protected. Excessive loss of moisture shall be prevented by sprinkling, sealing, or covering with a subsequent layer. Should the subgrade, due to any reason or cause, lose the required stability, density, or moisture before it is protected by placement of the next layer, it shall be re-compacted and refinished and retested at the expense of the Contractor until acceptable to the City. 022040 Page 1 of 3 Rev.10-30-2014 (C) Curb Backfill and Topsoil(Sidewalks,Parkways, Islands, etc.) Fill and compact areas behind curbs and adjacent to sidewalks and driveways within 48 hours after completion of concrete work. The top 6 inches (where disturbed by construction or where unsatisfactory material is exposed by excavation) of finish earth grade shall be clean excavated material or topsoil capable of supporting a good growth of grass when fertilized and seeded or sodded. It shall be free of concrete, asphalt, shell, caliche, debris and any other material that detracts from its appearance or hampers the growth of grass. Topsoil shall meet the requirements specified in City Standard Specification Section 028020 "Seeding". (D) Matching Grades at Right-of-Way Line Finish grade at the property line shall be as shown on the drawings. The Engineer may require a reasonable amount of filling on private property where the sidewalk grade is above the property elevation. Use suitable material from the excavation. Unless otherwise directed, cuts at right-of- way lines shall be made at a slope of three horizontal to one vertical(3:1) or flatter. (E) Drainage During construction, the roadbed and ditches shall be maintained in such condition as to insure proper drainage at all times, and ditches and channels shall be so constructed and maintained as to avoid damage to the roadway section. All slopes which, in the judgment of the Engineer,require variation, shall be accurately shaped, and care shall be taken that no material is loosened below the required slopes. All breakage and slides shall be removed and disposed of as directed. 3. SELECTION OF ROADBED MATERIALS Where shown on the plans, Select Material shall be utilized to improve the roadbed, in which case the work shall be performed in such manner and sequence that suitable materials may be selected, removed separately, and deposited in the roadway within limits and at elevations required. Material used for roadway embankment shall meet the requirements of City Standard Specification Section 022100 Select Material. 4. GEOGRID If indicated on the drawings, geogrid shall be placed in the base layer according to the pavement details to provide a mechanically-stabilized aggregate base layer within the pavement structure. Geogrid shall be "Tensar TX5 Triaxial Geogrid", or pre-approved equivalent. Use (and approval) of a different product must be supported by documentation showing that the alternate pavement section will meet or exceed the required number of 18-kip equivalent single axle loads (ESAL) and structural number (SN) over the stated pavement design life, and the pavement design must be sealed and signed by a Texas professional engineer. Documentation must also include the structural design value used for the geogrid structural contribution, based on and supported by 022040 Page 2 of 3 Rev.10-30-2014 validated test data. Alternate pavement designs shall utilize the same structural design values for other pavement structural components (HMAC, base, sub-base) as used in the original pavement design, and the pavement designs must be approved by the Engineer and the geotechnical consultant. Contractor shall take care to protect geogrid from damage. Overlap edges of geogrid in accordance with the manufacturer's recommendations, but not less than 12 inches. Do not drive tracked equipment directly on the geogrid. Provide at least 6 inches of compacted aggregate base material over the geogrid before driving any tracked equipment over the geogrid area. Standard highway- legal rubber-tired trucks may drive over the geogrid at very slow speeds (less than 5 mph). Avoid turns and sudden starts and stops when driving on the geogrid. Any damaged geogrid shall be replaced by the Contractor at no additional cost to the City. Proper replacement shall consist of replacing the affected area adding 3 feet of geogrid in each direction beyond the limits of the affected area. 5. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, street excavation shall be measured and paid for by the square yard to the limits shown on the drawings including excavation for street transitions. Payment shall be full compensation for furnishing all labor, materials, tools, equipment, borrow material and incidentals necessary to complete the work. Unless otherwise specified on the Bid Form, compacted subgrade shall be measured and paid for by the square yard to the limits shown on the drawings. Payment shall be full compensation for furnishing all labor, materials, tools, equipment, borrow material and incidentals necessary to complete the work. Unless otherwise specified on the Bid Form, geogrid shall be measured and paid for by the square yard to the limits shown on the drawings, excluding overlaps. Payment shall be full compensation for furnishing all labor, materials, tools, equipment, and incidentals necessary to complete the work. All work required for disposing of waste, including hauling will not be paid for directly but shall be considered subsidiary to the various contract items. 022040 Page 3of3 Rev.10-30-2014 SECTION 022100 SELECT MATERIAL 1. DESCRIPTION This specification shall govern the use of Select Material to be used to treat designated sections of roadways, embankments, trenches, etc. Select material shall be non-expansive sandy clay (CL) or clayey sand (SC), in accordance with the Unified Soil Classification System (ASTM D2487). Select Material shall meet the following requirements: Free of vegetation,hard lumps,rock fragments, or other debris No clay lumps greater than 2" diameter Liquid Limit(L.L.): <35 Plasticity Index(P.I.)Range: 8 to 20 Moisture Content: as specified in the drawings 2. CONSTRUCTION METHODS Select material shall be mixed uniformly and placed in layers as indicated, not to exceed 10 inches loose depth (or 12 inches maximum for sanitary sewer trench backfill per City Standard Details for Sanitary Sewers). Unless otherwise specified, the material shall be compacted to a minimum of 95% Standard Proctor density. Each layer shall be complete before the succeeding layer is placed. The finished surface of the select material shall conform to the grade and section shown on the drawings. 3. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, select material shall not be measured for pay, but shall be subsidiary to the appropriate bid item. 022100 Page 1 of 1 Rev.10-30-2014 SECTION 022420 SILT FENCE 1. DESCRIPTION This specification shall govern all work necessary for providing and installing silt fencing required to control sedimentation and erosion during construction of the project. 2. MATERIAL REQUIREMENTS A. Geotextile shall meet the requirements for temporary silt fence per AASHTO M288. B. Fence Reinforcement Materials: Silt fence reinforcement shall be one of the following systems. Type l: Self-Supported Fence - This system consists of fence posts, spaced no more than 8- 1/2 feet apart, and geotextile without net reinforcement. Fence posts shall be a minimum of 42 inches long, embedded at least one (1) foot into the ground, and constructed of either wood or steel. Soft wood posts shall be at least 3 inches in diameter or nominal 2 x 4 inches in cross section and essentially straight. Hardwood posts shall be a minimum of 1.5 x 1.5 inches in cross section. Fabric attachment may be by staples or locking plastic ties at least every 6 inches, or by sewn vertical pockets. Steel posts shall be T or L shaped with a minimum weight of 1.3 pounds per foot. Attachment shall be by pockets or by plastic ties if the posts have suitable projections. Type 2: Net-Reinforced Fence - This system consists of fence posts, spaced no more than 8-1/2 feet apart, and geotextile with an attached reinforcing net. Fence posts shall meet the requirements of Self-Supported Fence. Net reinforcement shall be galvanized welded wire mesh of at least 12.5-gauge wire with maximum opening size of 4 x 2 inches. The fabric shall be attached to the top of the net by crimping or cord at least every 2 feet, or as otherwise specified. Type 3: Triangular Filter Dike - This system consists of a rigid wire mesh, at least 6-gauge, formed into an equilateral triangle cross-sectional shape with sides measuring 18 inches, wrapped with geotextile silt fence fabric. The fabric shall be continuously wrapped around the dike,with a skirt extending at least 12 inches from its upslope corner. C. Packaging Requirements: Prior to installation, the fabric shall be protected from damage due to ultraviolet light and moisture by either wrappers or inside storage. 022420 Page 1 of 2 Rev.10-30-2014 D. Certification and Identification: Each lot or shipment shall be accompanied by a certification of conformance to this specification. The shipment must be identified by a ticket or by labels securely affixed to the fabric rolls. This ticket or label must list the following information: a. Name of manufacturer or supplier b. Brand name and style C. Manufacturer's lot number or control number d. Roll size (length and width) e. Chemical composition 3. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, silt fence shall be measured by the linear foot. Payment shall be at the bid price for the unit of measurement specified and shall be full compensation for furnishing all labor, materials, tools, equipment and incidentals necessary to complete the work. Payment shall include, but not be limited to, placing, maintaining and removing the silt fence. 022420 Page 2 of 2 Rev.10-30-2014 SECTION 025205 PAVEMENT REPAIR, CURB, GUTTER, SIDEWALK AND DRIVEWAY REPLACEMENT 1. DESCRIPTION This specification shall govern the removal and replacing of all types of pavements and surfacing required to complete the project. 2. MATERIALS Unless otherwise specified on the drawings, materials and proportions used along with this specification shall conform to the respective following specifications: City Standard Specifications Section 022020 "Excavation and Backfill for Utilities" Section 022100 "Select Material" Section 025223 "Crushed Limestone Flexible Base" Section 025424 "Hot Mix Asphaltic Concrete Pavement" Section 025610 "Concrete Curb and Gutter" Section 025612 "Concrete Sidewalks and Driveways" Section 025620 "Portland Cement Concrete Pavement" Section 030020 "Portland Cement Concrete", Class "A" Concrete Section 032020 "Reinforcing Steel" Section 038000 "Concrete Structures". 3. METHOD OF CUTTING The outline of the trench shall be marked upon the surface of the pavement to be cut,and all cuts into the pavement shall be saw-cut as nearly vertical as it is possible to make them. All unwanted materials removed shall be disposed of by the Contractor and shall not be used as backfill material. 4. BACKFILL OF TRENCH Excavation and backfilling of trench shall be in accordance with City Standard Specification Section 022020 "Excavation and Backfill for Utilities." 025205 Page 1 of 4 Rev.11-9-2016 5. REPLACING STREET AND OTHER PAVEMENT All pavements, driveways, sidewalks, and curbs and gutters which are cut shall be replaced in a workmanlike manner,with like or better materials or per pavement repair details to be provided on the drawings. Pavement cuts in a street for any utility requires a permit from the Director of Development Services in accordance with City Ordinance 030040, Article III Cuts and Excavations (12-17-2013). The installation of a utility that crosses the ROW at a perpendicular or near perpendicular angle and has an OD of 6" or less will not be permitted to be installed by cutting the road section. Street excavation/cut for a utility in an asphalt roadway shall include a full lane overlay or pavement repair for parallel cuts, or a 12' wide pavement repair for perpendicular cuts. Street excavation/cut for a utility in a concrete roadway shall include full panel replacement. The drawings and/or permit application should include a site specific pavement cut and restoration plan that indicates the general nature of the pavement and roadway(for examples, concrete arterial, asphalt residential) to be cut and restored, the existing pavement section (if known), the location and approximate area of the excavation/pavement repair, including the approximate length and width of the pavement repair in relation to the roadway travel lane(s). 6. REPLACING DRIVEWAY PAVEMENT On all concrete driveway pavements,the replacement shall consist of a reinforced Class"A"concrete slab with a minimum thickness of six(6)inches. The type of finish for the replaced section shall be the same as that appearing on the old pavement. Reinforcement shall be 44 bars at 12 inches each way with additional diagonal bars as indicated on the drawings. Any other type shall be replaced with like or better replacement. Replacement shall, in general, be to original joint or score mark. 7. REPLACING SIDEWALKS On all sidewalk pavements,the replacement shall consist of a reinforced Class"A"concrete slab four (4)inches thick. The type of finish for the replaced section shall be the same as that appearing on the old sidewalk. Replacement shall,in general,be to original joint or score marks. Reinforcement shall be 4" x 4" - W2.9 x W2.9 welded wire fabric located at mid-depth in the slab. 8. REPLACING CURB AND GUTTER On all curb and gutter, the replacement shall consist of a section conforming in all details to the original section or to City of Corpus Christi Standard curb and gutter section, if required by the Engineer. Cuts through the curb shall be replaced with Class "A" concrete. Preserve the original steel reinforcing and reinforce all new curbs with three 44 bars. Adjust grades for positive drainage. Replacement shall,in general,be to original j oint or score mark. For j ointed concrete roadways,the joints in curb or in curb and gutter should match the concrete roadway joints. 025205 Page 2 of 4 Rev.11-9-2016 9. REPAIRING STREET SHOULDERS AND UNIMPROVED STREETS On streets or roads without curb and gutter where a shoulder is disturbed,it shall be restored to like or better condition. The shoulder surface shall be rolled to an acceptably stable condition. The requirements of City Ordinance 030040 as stated above apply also to unimproved streets unless a specific variance is granted by the Director of Development Services. 10. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form,pavement repair shall be measured by the square yard of the type of repair specified; curb and gutter replacement shall be measured by the linear foot; and sidewalk and driveway replacement shall each be measured by the square foot. Payment will be made at the unit price bid for the completed work and shall be full compensation for all labor, materials,equipment,tools,and incidentals required to complete the work. No separate measurement or payment will be made for subgrade compaction, sand leveling course, geogrid, ordinary backfill, cement-stabilized sand backfill, flexible base,prime coat,hot-mix asphaltic concrete, etc. 025205 Page 3 of 4 Rev.11-9-2016 THIS PAGE INTENTIONALLY LEFT BLANK 025205 Page 4 of 4 Rev.11-9-2016 SECTION 025223 CRUSHED LIMESTONE FLEXIBLE BASE 1. DESCRIPTION This Specification shall govern all work for furnishing and placing Crushed Limestone Flexible Base required to complete the project. 2. MATERIAL Crushed Limestone Flexible Base shall consist of crushed limestone produced from oversize quarried aggregate, sized by crushing and produced from a naturally occurring single source, meeting the requirements for Type `A' material as specified in Texas Department of Transportation (TxDOT) Specification Item 247 "Flexible Base". Crushed gravel or uncrushed gravel shall not be acceptable. No blending of sources and/or additive materials will be allowed. The material shall be free of vegetation and shall be approved by the Engineer. All acceptable material shall be screened and the oversize shall be crushed and returned to the screened material in such a manner that a uniform product will be produced which meets all of the physical requirements for Grade 1-2 as specified in TxDOT Specification Item 247 "Flexible Base". 3. TESTING The City will engage a laboratory and pay for one test each gradation, liquid limit,plasticity index, modified proctor, moisture-density relation, CBR, and necessary field densities. The Engineer may call for additional tests at any time. The cost of all retests, in case of failure to meet specifications, will be deducted from the Contractor's payment. The City will pay for proctor and soil constants and abrasion tests at the rate described in the materials testing schedule. If material changes, the Contractor shall pay the cost of additional tests required by the Engineer. The Engineer may waive testing and/or lime admix for small amounts for unimportant uses. 4. CONSTRUCTION METHODS Prior to placement of flexible base, the surface of the previous underlying course shall be finished true to line and grade as established, and in conformity with the typical section shown on the drawings. Grade tolerance shall be generally 1/2 inch, and highs and lows must approximately balance. If called for in the drawings or elsewhere in the contract documents, geogrid, as specified in City Standard Specification Section 022040 "Street Excavation", shall be placed as indicated. Flexible base shall be delivered and spread the same day if possible(no later than the next day). Base shall be mixed as required to produce a uniform mixture with water. Base shall be placed in uniform lifts not to exceed 10 inch loose lifts or 8 inch compacted lifts. Moisture and density requirements shall be as indicated on the drawings, typical minimum 98% Modified Proctor 025223 Page 1 of 2 Rev.3-25-2015 (ASTM D1557) under flexible pavements or typical minimum 98% Standard Proctor (ASTM D698) under concrete pavement and to within + 2% of optimum moisture. The section may be accepted if no more than 1 of the 5 most recent moisture or density tests is outside of the specified limits, and the failed test is within+I% deviation from specified moisture or density requirements. The surface of the compacted base, after meeting moisture and density requirements, shall be primed in accordance with City Standard Specification Section 025412 "Prime Coat". On completion of compaction and priming, the surface shall be smooth and conform to lines, grades, and sections shown on the drawings. Areas with any deviation in excess of 1/4 inch in cross-section and in lengths of 16 feet measured longitudinally shall be corrected by loosening, adding or removing material,reshaping, and recompacting by repriming and rolling. Moisture and density shall be maintained until the paving is complete. Excessive loss of moisture shall be prevented by sprinkling, sealing, or covering with a subsequent layer. Should the base, due to any reason or cause, lose the required stability, density, or moisture before it is protected by placement of the next layer, it shall be re-compacted, refinished, and retested at the expense of the Contractor until acceptable to the City. 5. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, crushed limestone flexible base shall be measured by the square yard complete in place. Payment shall be full compensation for all materials, royalty, hauling, placing, compacting, labor, equipment, tools, and incidentals necessary for the completion of work. Prime shall be measured and paid under separate bid item if specified on the Bid Form. Geogrid shall be measured and paid under separate bid item if specified on the Bid Form. 025223 Page 2 of 2 Rev.3-25-2015 SECTION 025404 ASPHALTS, OILS AND EMULSIONS 1. DESCRIPTION This specification shall govern all work for asphalt cement, cut-back and emulsified asphalts, performance-graded asphalt binders, and other miscellaneous asphaltic materials required to complete the project. 2. MATERIALS When tested according to Texas Department of Transportation Test Methods,the various materials shall meet the applicable requirements of TxDOT Specification Item 300, "Asphalts, Oils, and Emulsions" (Latest Edition). 3. STORAGE, HEATING AND APPLICATION TEMPERATURES Store and apply asphaltic materials in accordance with TxDOT Item 300 (Latest Edition) at the lowest temperature yielding satisfactory results. Follow the manufacturer's instructions for any agitation requirements in storage and in application and storage temperatures. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, asphalts,oils and emulsions shall not be measured and paid for separately, but shall be considered subsidiary to the appropriate bid item. 025404 Page 1 of 1 Rev.10-30-2014 SECTION 025412 PRIME COAT 1. DESCRIPTION This specification shall consist of an application of asphalt material on the completed base course and/or other approved area in accordance with this specification. Prime Coat shall not be applied when the air temperature is below 60° F and falling, but it may be applied when the air temperature is above 50°F and is rising; the air temperature being taken in the shade and away from artificial heat. Asphalt material shall not be placed when general weather conditions, in the opinion of the Engineer, are not suitable. 2. MATERIALS The asphalt material used for the prime coat shall be MC-30 medium-curing cutback asphalt or AE- P asphalt emulsion prime, unless otherwise specified, and when tested by approved laboratory methods shall meet the requirements of City Standard Specification Section 025404 "Asphalts, Oils and Emulsions". Blotter material shall be native sand. 3. CONSTRUCTION METHODS When, in the opinion of the Engineer, the area and/or base is satisfactory to receive the prime coat, the surface shall be cleaned of dirt, dust, and other deleterious matter by sweeping or other approved methods. If found necessary by the Engineer, the surface shall be lightly sprinkled with water just prior to application of the asphalt material. The asphalt material shall be applied on the clean surface by an approved type of self-propelled pressure distributor so operated as to distribute the material in the quantity specified, evenly and smoothly under a pressure necessary for proper distribution. The Contractor shall provide all necessary facilities for determining the temperature of the asphalt material in all of the heating equipment and in the distributor, for determining the rate at which it is applied, and for securing uniformity at the junction of two distributor loads. All storage tanks, piping, retorts, booster tanks and distributors used in storing or handling asphalt material shall be kept clean and in good operating condition at all times, and they shall be operated in such manner that there will be no contamination of the asphalt material with foreign material. It shall be the responsibility of the Contractor to provide and maintain in good working order a recording thermometer at the storage-heating unit at all times. The distributor shall have been recently calibrated and the Engineer shall be furnished an accurate and satisfactory record of such calibration. After beginning of the work, should the yield on the asphalt material applied appear to be in error, the distributor shall be calibrated in a manner satisfactory to the Engineer before proceeding with the work. Prime shall be applied at a temperature within the recommended range per City Standard 025412 Page 1 of 2 Rev.10-30-2014 Specification Section 025404 "Asphalts, Oils and Emulsions", with that range being 70 to 150 degrees F. Application rate shall be not less than 0.15 gallon per square yard, unless otherwise specified. The Contractor shall be responsible for the maintenance of the surface until the Engineer accepts the work. No traffic hauling or placement of any subsequent courses shall be permitted over the freshly applied prime coat until authorized by the Engineer. Spread blotter material before allowing traffic to use a primed surface. Allow sufficient time for the prime coat to cure properly before applying surface treatment or asphaltic concrete pavement. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, prime coat shall be measured by the gallon of asphalt material applied. Payment shall include furnishing, heating, hauling and distributing the asphalt material as specified; for furnishing, spreading and removing sand blotter material; for all freight involved; and for all manipulation, labor, materials, tools, equipment and incidentals necessary to complete the work. 025412 Page 2 of 2 Rev.10-30-2014 SECTION 025424 HOT MIX ASPHALTIC CONCRETE PAVEMENT (Class A) 1. DESCRIPTION This specification shall govern all work required for furnishing and laying Hot Mix Asphalt Concrete (HMAC) surface, binder and base courses required to complete the project. All subsurface utilities must be inspected, tested, and accepted prior to any paving. 2. MATERIALS 2.1. Aggregate. The aggregate shall consist of a blend of course aggregate, fine aggregate and, if required, a mineral filler. 2.1.1. Coarse Aggregate shall consist of that fraction of aggregate retained on a No. 10 sieve and shall consist of crushed furnace slag, crushed stone, or crushed gravel. Deleterious material in course aggregate shall not exceed 2% per TxDOT Test Method TEX-217-F. Course aggregate shall be crushed such that a minimum of 85%of the particles have more than one crushed face, unless noted otherwise on the plans. Los Angeles abrasion losses for course aggregate shall not exceed 40%by weight for the surface course and 45%for the binder and base courses per TxDOT Test Method TEX-410-A. Polish Value not less than 30 for aggregate used in the surface course per TxDOT Test Method TEX-438-A. 2.1.2. Fine Aggregate is defined as the fraction passing a No. 10 sieve and shall be of uniform quality. Fine aggregate shall consist of screenings of material that pass the Los Angeles abrasion requirements in paragraph 2.1.1 above. Screenings shall be blended with a maximum of 15% uncrushed aggregate or field sand for Type D mixes, or a maximum of 10%uncrushed aggregate or field sand for Type A, B, and C mixes. Grading of fine aggregate shall be as follows: Sieve Size Percent Passing by Weight No. 10 100 No. 200 0-15 025424 Page 1 of 8 Rev.3-25-2015 2.1.3 Filler shall consist of dry stone dust,Portland cement,hydrated lime, or other mineral dust approved by the Engineer. Grading of filler shall be as follows: Sieve Size Minimum Percent Passing by Weight No. 30 95 No. 80 75 No. 200 55 2.2. Reclaimed Asphalt Pavement(RAP). Reclaimed asphalt pavement maybe incorporated into the hot mix asphalt concrete furnished for the project, provided that the mixture is designed per the TxDOT Methods and meets the applicable provisions of said TxDOT Item 340 and this specification. 2.3. Asphalt. Asphalt Material shall be in accordance with Standard Specification Section 025404 "Asphalt, Oils and Emulsions" and AASHTO. 2.3.1. Paving Mixture: APPLICATION ASPHALT GRADE Residential or low volume PG 64-22 Collector Surface Course PG 70-22 Binder Course PG 64-22 Arterial Surface Course PG 76-22 Binder Course PG 64-22 Base Courses PG 64-22 2.3.2. Tack Coat shall consist of an emulsion, SS-1 diluted with equal volume of water and applied at a rate ranging from 0.05 to 0.15 gallon per square yard. 3. PAVING MIXTURE 3.1. Mix Design. The mixture shall be designed in accordance with TxDOT Bulletin C-14 and TxDOT Test Method TEX-204-F to conform to the requirements of this specification. The Contractor shall furnish the mix design for the job-mix to be used for the project,unless shown otherwise on the drawings. The mix design shall be submitted prior to placement of the mixture. The design procedures are actually intended to result at a job-mix with properties in compliance with these specifications,and when properly placed the j ob-mix will be durable 025424 Page 2 of 8 Rev.3-25-2015 and stable. The sieve analysis of the job-mix shall be within the range of the Master Gradation and Tolerances specified herein. The job-mix shall meet the density and stability requirements as specified and shall be included with the mix design as submitted per above. If the specific gravity of any of the types of aggregates differs by more than 0.3,use volume method. Plot sieve analysis of job-mix; percent passing versus size on four-cycle semi-log paper or other appropriate type paper. Show tolerance limits and Limits of Master Gradation. 3.2. Master Gradation of Aggregate. The aggregate for the type of mix specified shall be within the following tabulated limits per TxDOT Test Method TEX-200-F (Dry Sieve Analysis): Type Sieve A B C D Size Course Fine Course Fine Base Base Surface Surface 1-1/2" 100 1-1/4" 95-100 1" 100 7/8" 70-90 95-100 100 5/8" 75-95 95-100 1/2" 50-70 100 3/8" 60-80 70-85 85-100 1/4" No. 4 30-50 40-60 43-63 50-70 No. 10 20-34 27-40 30-40 32-42 No. 40 5-20 10-25 10-25 11-26 No. 80 2-12 3-13 3-13 4-14 No. 200 1-6* 1-6* 1-6* 1-6* VMA minimum 11 12 13 14 025424 Page 3 of 8 Rev.3-25-2015 *2-8 when TxDOT Test Method Tex-200-F,Part H(Washed Sieve Analysis)is used. 3.3. Tolerances. The mixture delivered to the job site shall not vary from the job-mix by more than the tolerances specified below. The gradation of the produced mix shall not fall outside the Master Grading Limits, with the following exceptions: for Type B material coarser than 3/8" and for Type D material coarser than 44. Variations from job-mix shall not exceed the following limits, except as noted above: Item: Tolerances Percent by Weight or Volume 1" to No. 10 Plus or Minus 5.0 No. 40 to No. 200 Plus or Minus 3.0 Asphalt Weight Plus or Minus 0.5 Asphalt Volume Plus or Minus 1.2 3.4. Mix Properties. The mixture shall have a minimum Hveem stability of 40 for Type A, B, and C mixes, and 35 for Type D mixes per TxDOT Test Method TEX-208-F at an optimum density of 96% (plus or minus 1.5) of theoretical maximum density per TxDOT Test Methods TEX-227-F and TEX-207-F. 3.5. Sampling and Testing of Raw Materials. The Contractor shall sample materials as necessary to produce a mix in compliance with these specifications. 4. EQUIPMENT 4.1. Mixing Plants. Mixing plants shall be either the weigh batching type or the drum mix type. Both types shall be equipped with satisfactory conveyors, power units, aggregate handling equipment, aggregate screens and bins (weigh batch only), and pollution control devices as required. 4.2. Truck Scales. A set of truck scales, if needed for measurement, shall be placed at a location approved by the Engineer. 4.3. Asphalt Material Heating Equipment. Asphalt material heating equipment shall be adequate to heat the required amount of material to the desired temperature. Agitation with steam or air will not be permitted. The heating apparatus shall be equipped with a recording thermometer with a 24-hour continuous chart that will record the temperature of the asphalt at the highest temperature. 4.4. Surge-Stora _ge SySystem. A surge-storage system may be used provided that the mixture coming out of the bins is of equal quality to that coming out of the mixer. The system shall be equipped with a gob hopper, rotating chute or other devices designed to minimize segregation of the asphalt mixture. 4.5. Laydown Machine. The laydown machine shall be capable of producing a surface that will meet the requirements of the typical cross section, of adequate power to propel the 025424 Page 4 of 8 Rev.3-25-2015 delivery vehicles,and produce the surface tolerances herein required. It shall be wide enough to lay a 28-foot street(back-to-back of curbs) in a maximum of two passes. 4.6. Rollers. All rollers shall be self-propelled and of any type capable of obtaining the required density. Rollers shall be in satisfactory operating condition and free from fuel, hydraulic fluid, or any other fluid leaks. 5. STORAGE, PROPORTIONING AND MIXING 5.1. Storage and Heating of f Asphalt Materials. Asphalt cement shall not be heated to a temperature in excess of that recommended by the producer. Asphalt storage equipment shall be maintained in a clean condition and operated in such a manner that there will be no contamination with foreign matter. 5.2. Feeding and Dryin _g of Aggregates. The feeding of various sizes of aggregate to the dryer shall be done in such a manner that a uniform and constant flow of materials in the required proportions will be maintained. In no case shall the aggregate be introduced into the mixing unit at a temperature in excess of 350 degrees F. 5.3. Proportioning. All materials shall be handled and proportioned in a manner that yield an acceptable mixture as herein specified and as defined by the job-mix. 5.4. Mixing. 5.4.1. Weigh Batch Plant. In charging the weigh box and in charging the pugmill from the weigh box,such methods or devices shall be used as necessary to minimize segregation of the mixture. 5.4.2. Drum Mix Plant. The amount of aggregate and asphalt cement entering the mixer and the rate of travel through the mixer shall be coordinated so that a uniform mixture of the desired gradation and asphalt content will be produced. 5.4.3. The mixture produced from each type of plant shall not vary from the 'o) b-mix by more than the tolerances and restrictions herein specified. The mixture when discharged from the plant shall have a moisture content not greater than one percent by weight of total mix when determined by TxDOT Test Method TEX-212-F. 5.4.4. The mixture produced from each type of plant shall be at a temperature between 250 and 325 degrees F. After a target mixing temperature has been established, the mixture when discharged from the mixer shall not vary from this temperature by more than 25 degrees F. 6. CONSTRUCTION METHODS 6.1. Construction Conditions. For mat thicknesses greater than 1.5 inches, the asphalt material may be placed with a laydown machine when the air temperature is 40 degrees F and 025424 Page 5 of 8 Rev.3-25-2015 rising but not when the air temperature is 50 degrees F and falling. In addition,mat thickness less than and including 1.5 inches shall not be placed when the temperature of the surface on which the mat is placed is below 50 degrees F. All subsurface utilities shall be inspected, tested, and accepted prior to paving. 6.2. Prime Coat. If a prime coat is required, it shall be applied and paid for as a separate item conforming to the requirements of City Standard Specification Section 025412 "Prime Coat", except the application temperature shall be as provided above. The tack coat or asphaltic concrete shall not be applied on a previously primed flexible base until the primed base has completely cured to the satisfaction of the Engineer. 6.3. Tack Coat. Before the asphalt mixture is laid,the surface upon which the tack coat is to be placed shall be thoroughly cleaned to the satisfaction of the Engineer. The surface shall be given a uniform application of tack coat using materials and rates herein specified and/or as shown on the plans. The tack coat shall be rolled with a pneumatic tire roller as necessary. Tack coat is required before any pavement course not placed immediately following the previous course placement. 6.4. Transporting Asphalt Concrete. The asphalt mixture shall be hauled to the job site in tight vehicles previously cleaned of all foreign matter. In cool weather or for long hauls, canvas covers and insulated truck beds may be necessary. The inside of the bed may be given a light coating of lime water or other suitable release agent necessary to prevent from adhering. Diesel oil is not allowed. 6.5. Placing. The asphalt mixture shall be spread on the approved prepared surface with a laydown machine or other approved equipment in such a manner that when properly compacted, the finished surface will be smooth and of uniform density, and meet the requirements of the typical cross section as shown on the plans. 6.5.L Flush Structures. Adjacent to flush curbs, gutters, liners and structures, the surface shall be finished uniformly high so that when compacted, it will be slightly above the edge of the curb and flush structure. 6.5.2. Construction joints of successive courses of asphaltic material shall be offset at least six inches. Construction joints on surface courses shall coincide with lane lines, or as directed by the Engineer,but shall not be in the anticipated wheel path of the roadway. 6.6. Compacting. The asphalt mixture shall be compacted thoroughly and uniformly with the necessary rollers to obtain the required density and surface tolerances herein described and any requirements as shown on the plans. Regardless of the method of compaction control followed, all rolling shall be completed before the mixture temperature drops below 175 degrees F. 025424 Page 6 of 8 Rev.3-25-2015 6.7. In-Place Density. In-place density control is required for all mixtures except for thin, irregular level-up courses. Material should be compacted to between 96% and 92% of maximum theoretical density or between 4% and 8% air voids. Average density shall be greater than 92%and no individual determination shall be lower than 90%. Testing shall be in accordance with TxDOT Test Methods TEX-207-F and TEX-227-F. Pavement specimens,which shall be either cores or sections of the compacted mixture,will be tested as required to determine the percent air voids. Other methods, such as nuclear determination of in-place density,which correlate satisfactorily with actual project specimens may be used when approved by the Engineer. 6.8. Thickness. The total compacted average thickness of the combined HMAC courses shall not be less than the amount specified on the drawings. No more than 10% of the measured thickness(es)shall be more than 1/4 inch less than the plan thickness(es). If so,the quantity for pay shall be decreased as deemed appropriate by the Engineer. 6.9. Surface Smoothness Criteria and Tests. The pavement surface after compaction, shall be smooth and true to the established lines, grade and cross-section. The surface shall be tested by the City with the Mays Roughness Meter. The Mays Roughness Value for each 600-foot section shall not exceed ninety inches per mile per traffic lane. For each 600-foot section not meeting this criteria, the Engineer shall have the option of requiring that section to be reworked to meet the criteria,or paying an adjusted unit price for the surface course. The unit price adjustment shall be made on the following basis: Adjusted Unit Price= (Adjustment Factor) X Surface Course Unit Bid Price The adjustment factor shall be: For Residential Streets: Adjustment Factor= 1.999 - 0.0111 M For All Other Class Streets (Non Residential) Adjustment Factor= 1.287 - 0.0143 M Where M =Mays Roughness Value In no case shall the Contractor be paid more than the unit bid price. If the surface course is an inverted penetration (surface treatment) the Mays Roughness Value observed will be reduced by ten inches per mile,prior to applying the above criteria. Localized defects (obvious settlements, humps, ridges, etc.) shall be tested with a ten-foot straightedge placed parallel to the roadway centerline. The maximum deviation shall not 025424 Page 7 of 8 Rev.3-25-2015 exceed 1/8 inch in ten feet. Areas not meeting this criteria shall be corrected to the satisfaction of the Engineer. Pavement areas having surface irregularities, segregation, raveling or otherwise deemed unacceptable by the Engineer shall be removed and replaced by the Contractor in a manner approved by the Engineer, at no additional cost to the City. 6.10. Opening to Traffic. The pavement shall be opened to traffic when directed by the Engineer. The Contractor's attention is directed to the fact that all construction traffic allowed on pavement open to the public will be subject to the State laws governing traffic on highways. If the surface ravels, it will be the Contractor's responsibility to correct this condition at his expense. 7. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, hot mix asphaltic concrete pavement shall be measured by the square yard of the type and thickness of"Hot Mix Asphaltic Concrete" as shown on the drawings. The Contractor shall provide the Engineer with copies of the "pay ticket" identifying the truck and showing the gross empty weight of the truck with driver as it arrives at the plant and the gross loaded weight of the truck with driver as it leaves the plant. The measured amount will be the difference of the loaded and empty trucks converted to tons. Payment shall be full compensation for quarrying,furnishing all materials,freight involved; for all heating, mixing, hauling, cleaning the existing base course or pavement, tack coat, placing asphaltic concrete mixture, rolling and finishing; and for all manipulations, labor, tools, equipment, and incidentals necessary to complete the work except prime coat when required. Prime coat,performed where required,will be measured and paid for in accordance with the provisions governing City Standard Specification Section 025412 "Prime Coat". All templates, straightedges, scales, and other weight and measuring devices necessary for the proper construction, measuring and checking of the work shall be furnished, operated and maintained by the Contractor at his expense. Any paving placed prior to inspection, testing, and acceptance of underground utilities may be rejected by the City and will be replaced at the Contractor's expense after correcting any subsurface utility defects. Pavement that fails to meet the in place density criteria may be rejected by the City and will be replaced at the Contractor's expense,or such pavement may, at the City's discretion, be accepted by the City and the unit price for payment shall be reduced as deemed appropriate by the Engineer. 025424 Page 8 of 8 Rev.3-25-2015 SECTION 025608 INLETS 1. DESCRIPTION This specification shall govern for the construction of inlets complete in place and the materials used therein, including the installation, and the furnishing of frames, grates,rings and covers. 2. TYPES The various types of inlets are designated on the drawings by letters or by numbers indicating the particular design of each. Each type shall be constructed in accordance with the details shown on the drawings and to the depth required by the profiles and schedules given. 3. MATERIALS (1) Concrete. Concrete for curb inlets shall be Class "A" concrete conforming to the requirements of City Standard Specification Section 038000 "Concrete Structures", and City Standard Specification Section 030020 "Portland Cement Concrete", except as otherwise provided on the drawings. Concrete for grate inlets, drop inlets and post inlets shall be Class "C" concrete in accordance with City Standard Specification Section 030020 "Portland Cement Concrete". (2) Mortar. Mortar shall be composed of one part Portland cement and two parts clean, sharp mortar sand suitably graded for the purpose by conforming in other respects to the provisions of City Standard Specification Section 030020 "Portland Cement Concrete" for fine aggregate. Hydrated lime or lime putty may be added to the mix but in no case shall it exceed 10 percent by weight of the total dry mix. (3) Reinforcing Steel. Reinforcing Steel shall conform to the requirements of City Standard Specification Section 032020 "Reinforcing Steel". (4) Concrete Blocks. Concrete blocks, when shown on the drawings, shall conform to the requirements of ASTM C 139. (5) Frames, Grates, Rings and Covers. Frames, grates, rings and covers shall conform to the requirements of City Standard Specification Section 055420 "Frames, Grates, Rings and Covers". (6) Cast Iron. Cast iron for supports and inlet units shall conform to the shape and dimensions shown on the plans. The castings shall be clean and perfect, free from sand or blow holes or other defects. Cast iron castings shall conform to the requirements of"Gray Iron Castings" ASTM A 48, Class 30. 025608 Page 1 of 2 Rev.3-25-2015 4. CONSTRUCTION METHODS (1) General. All concrete work shall be performed in accordance with the requirements of City Standard Specification Section 038000 "Concrete Structures", unless otherwise specified. Forms will be required for all concrete walls, except where the nature of the surrounding material is such that it can be trimmed to a smooth vertical face. (2) Inlets for Precast Concrete Pipe Sewers. The construction of inlets for precast concrete pipe sewers shall be done as soon as is practicable after sewer lines into or through inlet locations are completed. All sewers shall be cut neatly at the inside face of the walls of inlet and pointed up with mortar. Subgrade under cast-in-place and precast inlets shall be compacted to not less than 95% Standard Proctor density. (3) Inverts. The inverts passing out or through the inlet shall be shaped and routed across the floor of inlet as shown on the plans. This shaping may be accomplished by adding and shaping mortar or concrete after the base is cast or by placing the required additional material with the base. (4) Finishing _Complete Inlets. Inlets Inlets. Inlets shall be completed in accordance with the drawings. Backfilling to finish grade elevation with native material, free of debris and compacted to over 95% Standard Proctor density. Backfilling shall be in accordance with the provisions of City Standard Specification Section 022020 "Excavation and Backfill for Utilities". 5. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, inlets shall be measured as individual units by each inlet, complete in place. Extension to inlets will be measured by each extension separately from the inlet. Excavation, backfill, frames, grates, rings and covers will be considered subsidiary to the construction of the inlets. Payments shall be full compensation for furnishing all concrete, reinforcing steel, mortar, castings, frames, grates, rings and covers, and for all other materials, labor, tools, equipment and incidentals required to perform the work prescribed above. 025608 Page 2 of 2 Rev.3-25-2015 SECTION 025610 CONCRETE CURB AND GUTTER 1. DESCRIPTION This specification shall consist of Portland cement concrete combined concrete curb and gutter or separate concrete curb with or without reinforcing steel as required, constructed on an approved subgrade or foundation material in accordance with these specifications, in conformity with the lines and grades established by the Engineer and details shown on the drawings. 2. MATERIALS Unless otherwise specified on the drawings, materials and proportions for concrete used in construction under this specification shall conform to the requirements as specified for Class "A" Concrete under City Standard Specification Section 030020 "Portland Cement Concrete". Reinforcing steel shall conform to the requirements as specified in City Standard Specification Section 032020 "Reinforcing Steel". Expansion joint filler shall be redwood material meeting the requirements specified in City Standard Specification Section 038000 "Concrete Structures". 3. CONSTRUCTION METHODS The foundation shall be excavated and shaped to line, grade and cross-section, and hand tamped and sprinkled. If dry, the subgrade or foundation material shall be sprinkled lightly with water and compacted to not less than 98% Standard Proctor density, or as required on the drawings. Flexible base shall be compacted to specified density and moisture immediately before concrete is deposited thereon. Outside forms shall be of wood or metal, of a section satisfactory to the Engineer, straight, free of warp, and of a depth equal to the depth of the curb and gutter. They shall be securely staked to line and grade, and maintained in a true position during the depositing of concrete. Inside forms for the curb shall be approved material, shall be of such design as to provide the curb required, and shall be rigidly attached to the outside forms. For reinforced concrete roadways, all jointing must be reflected through the curb, including redwood expansion joints and construction joints. Driveway gutter shall be placed integrally with the driveway as shown on the City Standard Details. The reinforcing steel shall be placed in position as shown on the typical details. Care shall be exercised to keep all reinforcing steel in its proper location. Concrete for curb and gutter shall be mixed in a manner satisfactory to the Engineer. The curb and gutter shall be placed in sections of the length indicated on the plans, and each section shall be separated by a premolded insert or board joint of cross-section specified for the curb and gutter, and of the thickness indicated on the drawings. 025610 Page 1 of 2 Rev.3-25-2015 After the concrete has been struck off and after it has become sufficiently set, the exposed surfaces shall be thoroughly worked with a wooden float. The exposed edges shall be rounded by the use of an edging tool to the radius indicated on the drawings. All exposed surfaces of curb and gutter, or curb, shall be brushed to a smooth and uniform surface. The completed curb and gutter shall be cured with Type 2, white pigmented curing compound unless shown otherwise on the drawings. Other methods of curing as outlined in City Standard Specification Section 038000 "Concrete Structures" will be acceptable with a required curing period of 72 hours. The area behind the curb shall be backfilled, tamped, and sloped as directed as soon as possible and no later than 48 hours after the removal of forms. Backfill shall be placed to the full height of the curb, or as otherwise specified. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, concrete curb and gutter or concrete curb will be measured by the linear foot for each type of curb, complete in place. Payment shall be full compensation for preparing the subgrade; for furnishing and placing all materials including reinforcing steel and expansion joint material; for furnishing,placing, shaping and tamping backfill; and for all manipulation, labor, tools, equipment and incidentals necessary to complete the work. 025610 Page 2 of 2 Rev.3-25-2015 SECTION 025612 CONCRETE SIDEWALKS AND DRIVEWAYS 1. DESCRIPTION This specification shall consist of sidewalks and driveways, with or without reinforcing steel, composed of Portland cement concrete,constructed as herein specified on an approved subgrade,in conformity with the lines and grades established by the Engineer and the details shown on the drawings. 2. MATERIALS Materials and proportions used in construction under this item shall conform to the requirements as specified for Class"A" concrete under City Standard Specification Section 030020"Portland Cement Concrete". Reinforcing steel shall conform to the requirements as specified in City Standard Specification Section 032020 "Reinforcing Steel". Expansion joint filler shall be redwood meeting the requirements specified in City Standard Specification Section 038000"Concrete Structures". Cap seal shall be "Greenstreak" or approved equal. 3. CONSTRUCTION METHODS The subgrade shall be excavated, compacted and shaped to line, grade and cross-section and hand tamped and sprinkled with water. Subgrade under concrete sidewalks and driveways shall be compacted to not less than 95% Standard Proctor density. The subgrade shall be within 0-3% of optimum moisture content at the time the concrete is placed. Forms shall be of wood or metal, of a section satisfactory to the Engineer, straight, free from warp, and of a depth equal to the thickness of the finished work. They shall be securely staked to line and grade and maintained in a true position during the depositing of concrete. The reinforcing steel shall be placed in position as shown on the drawings. Care shall be exercised to keep all reinforcing steel in its proper location. Driveways shall incorporate the gutter in a unified concrete placement as shown in the City Standard Detail for driveways. Sidewalks shall be constructed in sections of the lengths shown on drawings. Unless otherwise provided by the drawings,no section shall be of a length less than 8 feet, and any section less than 8 feet shall be removed by the Contractor at his own expense. 025612 Page 1 of 2 Rev.3-25-2015 The different sections shall be separated by a premolded insert or board j oint of the thickness shown on the drawings, placed vertically and at right angles to the longitudinal axis of the sidewalks. Where the sidewalk or driveways abut a curb or retaining wall, approved expansion joint material shall be placed along their entire length. Similar expansion joint material shall be placed around all obstructions protruding through sidewalks or driveways. Concrete shall be mixed in a manner satisfactory to the Engineer,placed in the forms to the depth specified and spaded and tamped until thoroughly compacted and mortar entirely covers the surface. The top surface shall be floated with a wooden float to a gritty texture. The outer edges and joints shall then be rounded with approved tools to the radii shown on drawings. 5-foot wide sidewalks shall be marked into separate sections, each 5 feet in length, by the use of approved jointing tools. For other widths of sidewalk,joints to be spaced longitudinally to match the transverse width. When completed, the sidewalks and driveways shall be cured with Type 2,white pigmented curing compound. Other methods of curing as outlined in City Standard Specification Section 038000 "Concrete Structures" will be acceptable with a required curing period of 72 hours. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form,concrete sidewalks and driveways shall be measured by the square foot of surface area of completed sidewalks, driveways, or sidewalks and driveways, as indicated on the drawings. Payment shall be full compensation for preparing and compacting the subgrade; for furnishing and placing all materials including concrete, reinforcing steel and expansion joint material; and for all manipulation, labor, tools, equipment and incidentals necessary to complete the work. 025612 Page 2 of 2 Rev.3-25-2015 SECTION 025614 CONCRETE CURB RAMPS 1. DESCRIPTION This specification shall govern all work necessary for constructing Concrete Curb Ramps required to complete the project. 2. MATERIALS Concrete shall be Class"A"in accordance with Section 030020"Portland Cement Concrete"of the City Standard Specifications. Reinforcement shall be 4x4 -W2.9xW2.9 welded wire fabric or 44 steel reinforcing bars spaced at 12 inches each way in accordance with Section 032020 "Reinforcing Steel" of the City Standard Specifications. 3. CONSTRUCTION METHODS The subgrade shall be shaped to line, grade and cross-section, and shall be of uniform density and moisture when concrete is placed. The subgrade shall be hand tamped and sprinkled with water to achieve the desired consistency and uniform support. Subgrade compaction shall not be less than 95% Standard Proctor density. Ramps shall be constructed of Class"A" concrete to line and section as shown on the plans. Unless shown otherwise on the drawings, ramps shall have a minimum concrete thickness in excess of 5 inches,prior to application of the detectable warning surfacing. Slopes, S, shall be as follows, unless shown otherwise on the drawings: RAMPS Ramp in direction of travel . . . . . S < 1:12 Side slope of ramp (flare) . . . . . S < 1:10 Cross slope . . . . . . . . . . . . . 1:100 < S < 1:50 ADJOINING AREAS Landings adjacent to ramp . . . . . . S < 1:20 Driveways abutting tied sidewalks . . S < 1:10 Width of ramp shall be 60 inches(minimum),exclusive of flare,unless specifically shown otherwise on the drawings. No ramp shall be less than 36 inches wide under any circumstances. Obstructions 025614 Page 1 of 2 Rev.3-25-2015 shall be removed or relocated, as appropriate, or the location of the ramp may be shifted, if authorized. Detectable warning surface shall be polymer composite material detectable warning panels as shown on the drawings. Surfacing shall be flush with abutting areas and placed using a template as required to achieve an esthetic well-defined edge. Surfacing shall be subsidiary work and will not be measured for separate pay. Pavement markings for street crossings shall be placed such that the crosswalk is properly aligned with respect to the curb ramp. See striping details for proper alignment of pavement markings with respect to intersection and curb ramp. Properly constructed curb ramp shall be true to line, section and grade, and shall be free of loose material and irregularities. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form,concrete curb ramps shall be measured by the horizontal square foot of ramp surface area, including side flares when used. Adjoining curbs, gutters, sidewalks, and driveways will be excluded from said measurement. Payment shall include, but not be limited to, subgrade preparation, formwork, concrete, rebar, detectable warning surfaces, borders, molding and curing required to complete the curb ramp, and shall be full compensation for all labor,materials, equipment and incidentals required to complete the work. 025614 Page 2 of 2 Rev.3-25-2015 SECTION 025620 PORTLAND CEMENT CONCRETE PAVEMENT 1. DESCRIPTION This specification shall govern for the construction of Portland cement concrete pavement on a prepared subgrade or base course, in accordance with the typical sections shown on the drawings. The concrete shall be composed of Portland cement, aggregates (fine and coarse), admixtures if desired or required, and water,proportioned and mixed as hereinafter provided. All subsurface utilities must be inspected, tested, and accepted prior to any paving. 2. MATERIALS (1) Cement The cement shall be either Type I, Type II or Type III Portland cement conforming to ASTM Designation: C150,modified as follows: Unless otherwise specified by the Engineer, the specific surface area of Type I and II cements shall not exceed 2000 square centimeters per gram(Wagner Turbidimeter— TxDOT Test Method Tex-310-D). The Contractor shall furnish the Engineer with a statement as to the specific surface area of the cement, expressed in square centimeters per gram,for each shipment. For concrete pavements, strength requirements shall be demonstrated using flexural (beam) or compressive(cylinder)tests as required in the drawings. Either Type I or II cement shall be used unless Type II is specified on the plans. Except when Type II is specified on the plans, Type III cement may be used when the anticipated air temperature for the succeeding 12 hours will not exceed 60°F. Type III cement shall be used when high early strength concrete pavement is specified on the drawings. Different types of cement may be used in the same project, but all cement used in any one monolithic placement of concrete pavement shall be of the same type and brand. Only one brand of each type of cement will be permitted in any one project unless otherwise authorized by the Engineer. Cement may be delivered in bulk where adequate bin storage is provided. All other cement shall be delivered in bags marked plainly with the name of the manufacturer and the type of cement. Similar information shall be provided in the bills of lading accompanying each shipment of packaged or bulk cement. Bags shall contain 94 pounds net. All bags shall be in good condition at time of delivery. All cement shall be properly protected against dampness. No caked cement will be accepted. 025620 Page 1 of 5 Rev.3-25-2015 Cement remaining in storage for a prolonged period of time may be retested and rejected if it fails to conform to any of the requirements of these specifications. (2) Mixing Water Water for use in concrete and for curing shall be in accordance with City Standard Specification Section 030020 "Portland Cement Concrete". (3) Coarse Aggregate Coarse aggregate for use in concrete mixture shall be in accordance with City Standard Specification Section 030020 "Portland Cement Concrete", Grade No. 2. (4) Fine Aggregate Fine aggregate for use in concrete mixture shall be in accordance with City Standard Specification Section 030020 "Portland Cement Concrete", Grade No. 1. (5) Mineral Filler Mineral filler shall consist of stone dust, clean crushed sand, or other approved inert material. (6) Mortar(Grout) Mortar for repair of concrete pavements shall consist of 1 part cement, 2 parts finely graded sand, and enough water to make the mixture plastic. When required to prevent color difference, white cement shall be added to produce the color required. When required by the Engineer, latex adhesive shall be added to the mortar. (7) Admixtures Calcium chloride will not be permitted. Unless otherwise noted, air-entraining, retarding and water-reducing admixtures may be used in all concrete and shall conform to the requirements of City Standard Specification Section 030020 "Portland Cement Concrete". (8) Reinforcing Steel Unless otherwise designated on the plans, all steel reinforcement shall be deformed bars, and shall conform to ASTM Designation: A615, Grade 60, and shall be open hearth, basic oxygen or electric furnace new billet steel in accordance with City Standard Specification Section 032020 "Reinforcing Steel". Dowels shall be plain billet steel smooth bars conforming to ASTM Designation: A615, Grade 60, and shall have hot-dip galvanized finish. 3. STORAGE OF MATERIALS All cement and aggregate shall be stored and handled in accordance with City Standard Specification Section 030020 "Portland Cement Concrete". 025620 Page 2 of 5 Rev.3-25-2015 4. MEASUREMENT OF MATERIALS Measurement of the materials, except water, used in batches of concrete, shall be in accordance with City Standard Specification Section 030020 "Portland Cement Concrete". 5. CLASSIFICATION AND MIX DESIGN It shall be the responsibility of the Contractor to furnish the mix design to comply with the requirements herein and in accordance with THD Bulletin C-11. The Contractor shall perform, at his own expense, the work required to substantiate the design, except the testing of strength specimens, which will be done by the Engineer. Complete concrete design data shall be submitted to the Engineer for approval. It shall also be the responsibility of the Contractor to determine and measure the batch quantity of each ingredient, including all water, so that the mix conforms to these specifications and any other requirements shown on the plans. In lieu of the above mix design responsibility, the Contractor may accept a design furnished by the Engineer; however, this will not relieve the Contractor of providing concrete meeting the requirements of these specifications. Trial batches will be made and tested using all of the proposed ingredients prior to placing the concrete, and when the aggregate and/or brand of cement or admixture is changed. Trial batches shall be made in the mixer to be used on the job. When transit mix concrete is to be used, the trial designs will be made in a transit mixer representative of the mixers to be used. Batch size shall not be less than 50 percent of the rated mixing capacity of the truck. Mix designs from previous or concurrent jobs may be used without trial batches if it is shown that no substantial change in any of the proposed ingredients has been made. This specification section incorporates the requirements of City Standard Specification Section 030020 "Portland Cement Concrete". 6. CONSISTENCY In cases where the consistency requirements cannot be satisfied without exceeding the maximum allowable amount of water, the Contractor may use, or the Engineer may require, an approved water-reducing or retarding agent, or the Contractor shall furnish additional aggregates or aggregates with different characteristics, which will produce the required results. Additional cement may be required or permitted as a temporary measure until aggregates are changed and designs checked with the different aggregates or admixture. The consistency of the concrete as placed should allow the completion of all finishing operations without the addition of water to the surface. When field conditions are such that additional moisture is needed for the final concrete surface finishing operation, the required water shall be applied to the surface by fog spray only, and shall be held to a minimum. The concrete shall be 025620 Page 3 of 5 Rev.3-25-2015 workable, cohesive, possess satisfactory finishing qualities, and of the stiffest consistency that can be placed and vibrated into a homogenous mass. Excessive bleeding shall be avoided. Slump requirements shall be as specified in Table 1. TABLE 1 Slump Requirements Construction Method Desired Slump Minimum Slump Maximum Slump Concrete Pavement(slipformed) 1.5 inches 1 inch 3 inches Concrete Pavement(formed) 4 inches 2.5 inches 6.5 inches NOTE: No concrete will be permitted with slump in excess of the maximum shown. 7. QUALITY OF CONCRETE The concrete shall be uniform and workable. The cement content, maximum allowable water- cement ratio, desired slump, minimum slump, maximum slump, and the strength requirements of the class of concrete for concrete pavement shall conform to the requirements of Table 1 and Table 2 and as required herein. During the process of the work, the Engineer will cast test beams or cylinders as a check on the flexural or compressive strength of the concrete actually placed. Testing shall be in accordance with City Standard Specification Section 030020 "Portland Cement Concrete". If the required flexural or compressive strength is not secured with the cement specified in Table 2, changes in the batch design will be made. The concrete shall meet either the minimum flexural (beam) strength (7-day or 28-day) or minimum compressive strength(7-day or 28-day) shown in Table 2. TABLE 2 Class of Concrete for Concrete Pavement Class Minimum Minimum Maximum of Flexural(Beam) Compressive Water-Cement Coarse Concrete Strength Strength Ratio Aggregate P* 450 psi(7 days) 3200 psi(7 days) 5.6 gal./sack No. 2 (1�/z") 570 psi(28 days) 4000 psi(28 days) 0.50 * 5% entrained air 8. MIXING CONDITIONS The concrete shall be mixed in quantities required for immediate use. Any concrete which is not in place within the limits outlined in City Standard Specification Section 038000 "Concrete Structures", Article "Placing Concrete-General", shall not be used. Re-tamping of concrete will not be permitted. 025620 Page 4 of 5 Rev.3-25-2015 Mixing conditions shall conform to the requirements of City Standard Specification Section 030020 "Portland Cement Concrete". 9. MIXING AND MIXING EQUIPMENT Mixing and mixing equipment shall conform to the requirements of City Standard Specification Section 030020 "Portland Cement Concrete". 10. READY-MIX PLANTS The requirements for ready-mix plants shall be as specified in City Standard Specification Section 030020 "Portland Cement Concrete". 11. PLACING, CURING AND FINISHING All subsurface utilities must be inspected, tested, and accepted prior to any paving. Subgrade preparation shall be as specified on the plans. The placing of concrete, including construction of forms and falsework, curing and finishing shall be in accordance with City Standard Specification Section 038000 "Concrete Structures". For membrane curing, curing material shall conform to Type 2, Class A curing compound, or as otherwise shown on the drawings. 12. JOINTS IN CONCRETE PAVEMENT The placing of joints in concrete pavement shall be in accordance with City Standard Specification Section 038000 "Concrete Structures" and as detailed on the drawings. 13. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, the quantities of concrete for concrete pavement(s), which will constitute the completed and accepted pavement(s) in-place, will be measured by the square yard or square foot for the indicated thickness and type of cement. Payment shall be full compensation for furnishing, hauling, mixing, placing, curing and finishing all concrete; all grouting and pointing; furnishing and placing reinforcing steel and steel dowels as shown on the plans; furnishing and placing drains; furnishing and placing metal flashing strips; furnishing and placing expansion joint material,joint filler and sealants, and contraction (control) joints required by this specification or shown on the plans; and for all forms and falsework, labor, tools, equipment and incidentals necessary to complete the work. Any paving placed prior to inspection, testing, and acceptance of underground utilities may be rejected by the City and will be replaced at the Contractor's expense after correcting any subsurface utility defects. 025620 Page 5 of 5 Rev.3-25-2015 SECTION 025802 TEMPORARY TRAFFIC CONTROLS DURING CONSTRUCTION 1. DESCRIPTION This specification shall govern all work required for Temporary Traffic Controls during construction. The work shall include furnishing, installing, moving, replacing, and maintaining all temporary traffic controls including, but not limited to, barricades, signs, barriers, cones, lights, signals, temporary detours, temporary striping and markers, flagger, temporary drainage pipes and structures, blue business signs, and such temporary devices as necessary to safely complete the project. 2. MATERIALS Traffic control devices shall conform to the latest edition of the "Texas Manual on Uniform Traffic Control Devices",unless indicated otherwise on the Traffic Control Plan. 3. METHODS Sufficient traffic control measures shall be used to assure a safe condition and to provide a minimum of inconvenience to motorists and pedestrians. If the Traffic Control Plan (TCP) is included in the drawings, any changes to the TCP by the Contractor shall be prepared by a Texas licensed professional engineer and submitted to the City Traffic Engineer for approval, prior to construction. If the TCP is not included in the drawings, the Contractor shall provide the TCP prepared by a Texas licensed professional engineer and submit the TCP to the City Traffic Engineer for approval,prior to construction. The Contractor is responsible for implementing and maintaining the traffic control plan and will be responsible for furnishing all traffic control devices, temporary signage and ATSSA certified flaggers. The construction methods shall be conducted to provide the least possible interference to traffic so as to permit the continuous movement of traffic in all allowable directions at all times. The Contractor shall cleanup and remove from the work area all loose material resulting from construction operations at the end of each workday. All signs, barricades, and pavement markings shall conform to the BC standard sheets, TCP sheets and the latest version of the "Texas Manual on Uniform Traffic Control Devices". The Contractor may be required to furnish additional barricades, signs, and warning lights to maintain traffic and promote motorists safety. Any such additional signs and barricades will be considered subsidiary to the pay item for traffic control. All signs, barricades, and posts will be either new or freshly painted. The contractor and any traffic control subcontractor must be ATSSA certified for Traffic Control. 025802 Page 1 of 3 Rev.10-30-2014 A competent person, responsible for implementation of the TCP and for traffic safety, shall be designated by the Contractor. The name and off-hours phone number of the competent person shall be provided in writing at the Pre-Construction Conference. The competent person shall be on site, during working hours and on call at all times in the event of off-hour emergency. The contractor must provide temporary blue sign boards that direct traffic to businesses and driveways during each phase of construction— see example below. The sign boards may be either skid mounted or barrel mounted. The City will assist the contractor in determining which businesses and driveways will receive signage during various construction phases. The provision, installation, and removal of signage will be considered to be subsidiary to the contract items provided for"Traffic Control." Example Blue Sign 40 MANDARIN GARD [ ....... 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, temporary traffic controls during construction shall be measured as a lump sum. Payment shall include, but not be limited to, furnishing, installing, moving, replacing and maintaining all temporary traffic controls including, but not limited to, barricades, signs, barriers, cones, lights, signals, temporary striping and markers, flaggers, removable and non-removable work zone pavements markings and signage, channelizing devices, temporary detours, temporary flexible-reflective roadway marker tabs, temporary traffic markers, temporary drainage pipes and structures, blue business signs, and such temporary devices and relocation of existing signs and devices. Payment shall be full compensation for all labor, equipment, materials, personnel, and incidentals necessary to provide a safe condition during 025802 Page 2 of 3 Rev.10-30-2014 construction of all phases and elements of the project and to complete the work. Payment will be made on the following basis: The initial monthly estimate will include 50% of the lump sum bid amount minus retention (typically 5%). The balance will be paid with the final estimate,upon completion of the project. 025802 Page 3 of 3 Rev.10-30-2014 DEPARTMENTAL MATERIALS SPECIFICATION PAVEMENT MARKERS(REFLECTORIZED) DMS - 4200 PAVEMENT MARKERS (REFLECTORIZED) EFFECTIVE DATE: JANUARY 2010 4200.1. Description. This Specification governs for the pre-qualification, testing, and field evaluation requirements for reflectorized pavement markers (RPMs). 4200.2. Units of Measurements. The values given in parentheses (if provided) are not standard and may not be exact mathematical conversions. Use each system of units separately. Combining values from the two systems may result in nonconformance with the standard. 4200.3. Material Producer List. The Materials and Pavements Section of the Construction Division(CST/M&P) maintains the Material Producer List(MPL) of all materials conforming to the requirements of this specification. Materials appearing on the MPL, entitled "Jiggle Bar Tiles, Pavement Markers, and Traffic Buttons,"require no further testing, unless deemed necessary by the Project Engineer or CST/M&P. 4200.4. Bidders' and Suppliers' Requirements. Before any material is allowed for use on Department projects, it must be of manufacture and product code or designation shown on the MPL. 4200.5. Pre-Qualification Procedure. The pre-qualification procedure consists of several steps, listed below, which are described in more detail in the following subsections: • Pre-qualification request, • Laboratory testing, • Field testing, • Provisional qualification, • Project evaluations, • Full qualification, • Periodic evaluation, • Disqualification, and • Re-Qualification. CST/M&P will provide notification at the completion of each step and will require confirmation from the supplier's contact person before proceeding to the next step. Costs of sampling and testing are normally borne by the Department; however, the costs to sample, test, and conduct field evaluations for materials failing to conform to the requirements of this specification are borne by the supplier. This cost will be assessed at the rate established by the Director of CST/M&P and in effect at the time of testing and will be billed directly to the Contractor or supplier. TEXAS DEPARTMENT OF TRANSPORTATION 1 —7 EFFECTIVE DATE:JANUARY 2010 DEPARTMENTAL MATERIALS SPECIFICATION PAVEMENT MARKERS(REFLECTORIZED) A. Pre-Qualification Request. Prospective suppliers interested in submitting their product for evaluation must submit a written request to the Texas Department of Transportation, Construction Division, Materials &Pavements Section(CP51), 125 East 11th Street, Austin, TX 78701-2483. Include the following items with the request: • Name and contact information, including email address for the person who will be the primary contact during the qualification process; • Laboratory test results, from the manufacturer's lab or an independent test laboratory, showing actual test results that meet the requirements of ASTM D 4280; • Product data sheets; • List of locations and applications dates where the product is being evaluated or is in current use; and • Test results from the National Transportation Product Evaluation Program(NTPEP), if available. B. Laboratory Testing. Provide CST/M&P with 350 RPMs of each color and type for laboratory and field testing. Submit materials for laboratory testing and field evaluations at no cost to the Department. CST/M&P will acknowledge receipt of materials and specify a tentative completion date for laboratory testing. CST/M&P will test RPMs in accordance with Article 4200.6 and will send notification of results once laboratory testing is complete. If laboratory testing conducted by TxDOT or by NTPEP shows RPMs do not meet the requirements of this specification, evaluation will cease, and RPMs will not be qualified. Suppliers may resubmit materials for qualification after providing documentation identifying the cause and corrective action taken. C. Field Testing. Upon satisfactory completion of laboratory testing, CST/M&P will specify the location of one or more roadways selected for the 12-month field test and suggested application dates. The roadways will include: • a concrete surface, • a hot-mix asphalt surface, and • a Grade 3 sealcoat. The concrete and asphalt roadways will be full-access controlled freeways with a minimum average daily traffic (ADT) count of 35,000 vehicles, a minimum of 20% average daily truck traffic volume, and a minimum posted speed limit of 65 mph. The Grade 3 road test will be conducted on a four-lane divided highway with a minimum ADT count of 4,000 vehicles per lane, a minimum of 20% average daily truck traffic volume, and a minimum posted speed limit of 50 mph. Providing NTPEP test results meeting the requirements of this specification may replace the concrete and hot-mix asphalt field tests on a deck for deck basis. If TxDOT or NTPEP field testing shows RPMs do not meet the requirements of this specification, evaluation will cease, and RPMs will not be qualified. Suppliers may TEXAS DEPARTMENT OF TRANSPORTATION 2-7 EFFECTIVE DATE:JANUARY 2010 DEPARTMENTAL MATERIALS SPECIFICATION PAVEMENT MARKERS(REFLECTORIZED) resubmit materials for qualification after providing documentation identifying the cause and corrective action taken. 1. NTPEP Testing. Submit NTPEP test data to CST/M&P for review if available. CST/M&P will acknowledge receipt of NTPEP data and will provide results of review within one month of receipt. The 12-month NTPEP test results for the pre-qualification of RPMs must meet the following: • all the requirements specified in ASTM D 4280 for the tests performed by NTPEP; • a retention rate equal or greater than 90 % of the placed RPMs (excluding the RPMs removed for testing); • a visual evaluation of 3 or greater, as defined by the most recent NTPEP Project Work Plan for Field Evaluations of Raised Pavement Markers and Marker Adhesives, for the marker case and marker lens for a minimum of 90 % of the placed RPMs (excluding the RPMs removed for testing); and • the minimum retroreflectivity values required after 12 months on the roadway listed in Table 1. 2. Application. Provide the name of the contractor, the traffic control plan, and the manufacturer and product code for the adhesive at least two weeks prior to the application for CST/M&P review and approval. CST/M&P will confirm the date and location of the field evaluation installation and resolve any problems as necessary. CST/M&P will provide between fifty and one hundred RPMs of each submitted type for application from the samples submitted for laboratory testing. Testing of submitted markers occurs concurrently with a set of control RPMs, for compliance with the requirements of this specification. Control markers are those RPMs currently listed on the MPL; if the MPL is reorganized and no marker exists to act as a control, an RPM that has undergone the most recent NTPEP testing on both asphalt and concrete will be used. Supplier is responsible for application of the RPMs in the presence of CST/M&P. Application must meet all Department specifications for RPM application and traffic control as well as the manufacturer's recommendations. Notify CST/M&P of any problems or concerns with the installation within one week of application and request a re-installation, if necessary. 3. Evaluation. CST/M&P will notify supplier of a suggested date for field testing evaluation at least one month prior to completion of the 12-month field trial. Provide the name of the contractor and traffic control plan for the evaluation at least 2 weeks prior to the scheduled evaluation date. Materials must meet the following requirements: a. Retention Rate. The retention rate of the test RPMs must be no less than 5%below that of the control RPMs. TEXAS DEPARTMENT OF TRANSPORTATION 3-7 EFFECTIVE DATE:JANUARY 2010 DEPARTMENTAL MATERIALS SPECIFICATION PAVEMENT MARKERS(REFLECTORIZED) b. Body Damage. The test RPMs must not exhibit discoloration or body damage exceeding that of the control RPMs. They must not exhibit a repetitive form of damage or mode of failure (indicative of a design flaw) in a large percentage of the test RPMs. Body damage will be visually assessed according to NTPEP criteria. c. Functionality. Four RPMs placed at 80 foot spacing or eight RPMs placed at 40 foot spacing must be functional when viewed at night from a vehicle using the low beam headlight setting. They must be functional when viewed at a minimum distance of approximately 400 ft. in the daytime. A functional marker is both visible and conspicuous. d. Retroreflectivity. CST/M&P will remove twenty test RPMs from the pavement to undergo laboratory testing for retroreflectivity in accordance with Tex-842-B. Fifteen of the twenty RPMs pulled must pass the minimum reflective values shown in Table 1 (measured at 0.2° observation angle and 0° horizontal entrance angle). Table 1 Minimum Retroreflectivity(cd/fc)After 12 Months on the Roadway Face 12 Mo. Crystal 1.0 Amber 0.7 Red 0.2 D. Provisional Qualification. CST/M&P will grant provisional qualification after successful completion of the laboratory and field evaluations including NTPEP testing, when applicable. CST/M&P will send notification of provisional qualification, including the date of placement on the MPL, within one month after completion of the field evaluations. Failure to complete all project evaluation requirements successfully is grounds for cancellation of provisional qualification. E. Project Evaluation. Once the material is provisionally qualified and listed on the MPL, provide CST/M&P with project information for the first three jobs supplied with the RPMs and additional projects if requested. RPMs must meet the same performance criteria as for the field evaluation to receive full qualification. CST/M&P will return the project evaluation results after the 12-month evaluation of each project. 1. Full Qualification. CST/M&P will grant full pre-qualification and continue to list materials meeting all requirements of this specification on the MPL. Pre-qualification requires extensive field evaluations. It is critical that no significant changes are made to the RPMs' composition,manufacturing process, or design during or after pre-qualification without notifying CST/M&P. It is also critical that the RPMs provided be uniform, with minimum variations from marker to marker. Significant changes not reported by the manufacturer or variations in product, as determined by the Director of CST/M&P, may be cause for removal from the MPL. TEXAS DEPARTMENT OF TRANSPORTATION 4-7 EFFECTIVE DATE:JANUARY 2010 DEPARTMENTAL MATERIALS SPECIFICATION PAVEMENT MARKERS(REFLECTORIZED) 2. Failure. CST/M&P will revoke provisional qualification for RPMs that do not meet the performance criteria and will remove the RPMs from the MPL. Producers not qualified under this Specification may not furnish materials for Department projects and must show evidence of correction of all deficiencies before reconsideration for qualification. F. Periodic Evaluation. Periodic evaluation consists of random department-initiated laboratory testing, audits, and periodic required submittals or field testing. 1. Department-Initiated Laboratory Testing and Audits. The Department may conduct random sampling (per Tex-729-I) and testing on pre-qualified RPMs to identify changes in the material or nonconformity in production and to perform random audits of test reports. 2. Required Submittals or Field Testing. Every 5 years,provide NTPEP data showing continued compliance with the requirements of this specification. G. Disqualification. Causes for disqualification and removal from the MPL include, but are not limited to, the following: • material fails to meet the requirements stated in this specification; the producer fails to report changes in the composition, manufacturing process, or design to CST/M&P; the producer has unpaid charges for failing samples; or qualified RPMs demonstrate repeated and large-scale performance problems in the field. H. Re-Qualification. Suppliers disqualified and removed from the MPL may submit materials for requalification after submitting documentation identifying the cause of the problem and corrective action taken. 4200.6. Material Requirements. All RPMs must meet all requirements, except for requirements specified for a specific type. A. Reflectorized Types. • Type I-A must contain one face that reflects amber light. The body, other than the reflective face, must be yellow. • Type I-C must contain one face that reflects white light. The body, other than the reflective face, must be white or silver-white. • Type I-R must contain one face that reflects red light. The body, other than the reflective face, must be white or silver-white. • Type II-A-A must contain two reflective faces oriented 180° to each other, each of which must reflect amber light. The body, other than the reflective faces, must be yellow. TEXAS DEPARTMENT OF TRANSPORTATION 5-7 EFFECTIVE DATE:JANUARY 2010 DEPARTMENTAL MATERIALS SPECIFICATION PAVEMENT MARKERS(REFLECTORIZED) • Type II-C-R must contain two reflective faces oriented 180° to each other, one of which must reflect white light and one of which must reflect red light. The body, other than the reflective faces, must be white or silver-white. B. Appearance Requirements. The outer surface of the RPMs must be smooth except for the molding or stamping of the manufacturer's unique imprint. All corners and edges exposed to traffic must be rounded. C. Optical Requirements. The RPMs must be capable of providing amber, red, or white light reflection as required by the requisition or plans. The reflected light of each reflective face must conform to the minimum reflective specific intensity(SI)requirements listed in Table 2, measured in candelas per foot-candle (cd/fc). Table 2 Minimum SI per Reflective Face at 0.21 Observation Angle(cd/fc) Horizontal Entrance Angle Crystal Amber Red 00 3.00 2.00 0.75 200 1.50 1.00 0.30 D. Physical Requirements. When tested in accordance with Tex-434-A, the minimum strength of five markers must be 2,000 lb. with none exhibiting a deformation of more than 0.125 in. before achieving the minimum strength. A random sample of five markers will be tested in accordance with Tex-434-A. The average compression results must have a quality index value equal to or greater than 1.23. The quality index value will be calculated from the lower specification limit of 2,000 lb. load. The following equation is used to determine the quality index value: QL = (X — LSL) / s Where: QL= quality index value X = average result from test LSL = lower specification limit s = standard deviation from test. E. Heat Resistance. The RPMs must show no change in physical or optical properties when subjected to the requirements of Tex-846-B. The temperature will be 140°F with the marker in a vertical position. The SI of the pavement marker must not be less than 80% of its initial value after being subjected to the heat test. TEXAS DEPARTMENT OF TRANSPORTATION 6-7 EFFECTIVE DATE:JANUARY 2010 DEPARTMENTAL MATERIALS SPECIFICATION PAVEMENT MARKERS(REFLECTORIZED) F. Impact Test. The RPMs will be impact tested during the pre-qualification process. They will be impacted with a 20-1b. weight in the form of a 2-in. solid right-circular cylinder with a flat impact face having rounded edges falling freely through a vertical guide. The RPMs will be impacted while resting on a solid, flat, steel plate that is at least 1/2 in. thick. The RPMs will be tested at increasing heights until failure occurs. Failure will occur when the lens or body cracks. The height at which failure occurs -6 in. will be the acceptance threshold for RPMs supplied after pre-qualification. 4200.7. Archived Versions. Archived versions are available. TEXAS DEPARTMENT OF TRANSPORTATION 7-7 EFFECTIVE DATE:JANUARY 2010 DEPARTMENTAL MATERIALS SPECIFICATION BTTVMINOVSADHESIVE FOR PAVEMENT MARKERS DMS - 6130 BITUMINOUS ADHESIVE FOR PAVEMENT MARKERS EFFECTIVE DATE: JANUARY 2008 6130.1. Description. This Specification establishes the requirements for bituminous type hot- melt adhesive used for the placement of pavement markers. Two types are addressed: standard bituminous marker adhesive consisting of an asphalt base with homogeneously mixed mineral filler; and flexible bituminous marker adhesive consisting of a highly polymer modified asphalt. Either adhesive must be suitable for bonding ceramic and plastic markers to hydraulic cement concrete, asphaltic concrete, and chip-sealed road surfaces and be applicable when road surface and marker temperatures are in the approximate range of 4-71°C (40-160°F). The composition of the adhesive must be such that its properties will not deteriorate when heated to and applied at temperatures up to 218°C (425°F)using either air or oil jacketed melters. 6130.2. Units of Measurements. The values given in parentheses (if provided) are not standard and may not be exact mathematical conversions. Use each system of units separately. Combining values from the two systems may result in nonconformance with the standard. 6130.3. Material Requirements. A. Adhesive Properties. The adhesive must be smooth and homogeneous, containing no visible particles, and must comply with the requirements in Table 1. Table 1 Adhesive Properties Material Standard Adhesive Flexible Adhesive Property Test Method min max min max Softening Point, °F ASTM D 36 200 200 Penetration, 100 g, 5 s,25°C(77F),0.1 mm ASTM D 5 10 20 15 254 Flow, 5 hr., 70°C(158°F),mm 5 54 Heat Stability Flow, 5 hr.,70°C(158°F),mm 5 5 Viscosity, 10 rpm,204°C(400°F),Pa-s 7.5 7.5 Flash Point,C.O.C., °F ASTM D 92 550 550 Ductility, 5 cm/min, 77°F,cm AASHTO T 51 - 15 - Flexibility, 1 in.mandrel, 90°bend, 10 s ASTM D 3111 pass 1.Exception to ASTM D 5329;heat the sample as described in ASTM D 5, Section 7.1. 2.Exception to ASTM D 5329;condition the sample as described in"Test Methods." 3.As modified in"Test Methods" 4.Maximum penetration of 30 is allowed provided the result of the flow test is less than 1 mm. TEXAS DEPARTMENT OF TRANSPORTATION 1 —3 LAST REVIEWED:SEPTEMBER 2014 DEPARTMENTAL MATERIALS SPECIFICATION BTTUMINOUSADHESIVE FOR PAVEMENT MARKERS B. Asphalt Properties. This applies to standard bituminous adhesive only. The filler-free asphalt, obtained from the Extraction and Abson recovery process, as explained in Section 6130.4, must have the properties in Table 2. Table 2 Filler-Free Asphalt Properties Property Minimum Maximum Test Method Penetration, 100 g,5 s,25°C(77°F), 25 ASTM D 5 0.1 mm(in.) Viscosity, 135°C(275°F)Pa-s 1.2(12) ASTM D 2171 (Poises) Viscosity Ratio, 135°C(275°F) 2.2 ASTM D 1754 and ASTM D 2171 C. Filler Properties. This applies to standard bituminous adhesive only. The filler material, obtained using the filler separation technique described in Section 6130.4, must have the properties in Table 3. Table 3 Filler Properties Property Minimum Maximum Test Method Filler Content,wt. % 50 75 As in Section 6130.4. Filler Fineness, %passing: ASTM C 430,as modified in 45 µm o. 325) 75 -- Section 6130.4. 75 µm(No.200) 95 100 -- 150µm(No. 100) 6130.4. Test Methods. A. Heat Stability Flow. To determine the heat stability flow,place 1000 g of adhesive in a loosely-covered quart can, heat to 218°C (425°F) and maintain at this temperature 4 hours before performing the flow test. B. Extraction and Abson Recovery. Use this procedure to separate and recover the base asphalt from the adhesive. Heat the adhesive just to the point where it will easily flow. Transfer between 125 and 150 g into a 1000-mL (1-qt.) Erlenmeyer flask containing 400 mL (13.5 fl. oz.) of trichloroethylene with a temperature of 52-66°C (125-150°F). Stir this mixture thoroughly to dissolve the asphalt. Decant the solvent-asphalt mixture. Recover the base asphalt from solvent according to Tex-211-F,but begin with the centrifuge step; the primary distillation is not necessary. Repeat the above extraction- recovery method as necessary to obtain the desired quantity of asphalt. C. Filler Separation Technique. Use this procedure to separate the filler material from the asphalt and determine the filler content of the adhesive. Weigh 10.00± 0.01 g of solid adhesive, broken into small pieces, into a centrifuge flask with approximately 100 mL (3.5 fl. oz.)volume such as that specified in ASTM D 1796. Add 50 mL (1.7 fl. oz.) of trichloroethylene to the adhesive. Swirl or stir the mixture with a fine rod, taking care not TEXAS DEPARTMENT OF TRANSPORTATION 2-3 LAST REVIEWED:SEPTEMBER 2014 DEPARTMENTAL MATERIALS SPECIFICATION BTTUMINOUSADHESIVE FOR PAVEMENT MARKERS to lose any solids. Place the sample flask in a balanced centrifuge and spin using a minimum relative centrifugal force of 150 (as determined in ASTM D 1796, Section 6.) Remove the sample flask and decant the solvent, taking care not to lose any solids. Repeatedly add more solvent, centrifuge, and decant until the solvent becomes clear and the filler appears free of asphalt. Dry the recovered filler at 71 ± 3°C (160 ± 5°F) to remove solvent. Weigh the dried filler. Filter the decanted solvent through a filter paper with a 20-25 gm retention factor to verify there is no loss of filler. Calculate the filler content as a percentage of the original sample weight. D. Filler Fineness. Use this procedure to determine the filler fineness. Use the same apparatus as described in ASTM C 430, except also use 75µm(No. 200) and 150 gm (No. 100) sieves. Prepare a water solution containing 1 wt. percent of a nonionic, water- soluble surfactant, such as Triton X-100, beforehand. Thoroughly wet the 1 g dry sample in the surfactant solution and allow it to soak for 30 min. Transfer the filler completely into the 45 gm (No. 325) sieve cup. Wash the sample with the water spray, as described in ASTM C 430, Section 5, for 2 min., adding surfactant solution as needed to disperse any clumped particles. Dry and weigh the sample and perform calculations as directed in ASTM C 430. Repeat the procedure using the other two sieve sizes. 6130.5. Acceptance. Bituminous adhesives are pre-qualified in accordance with Tex-538-C. Consult`Bituminous Marker Adhesive" for a list of materials currently pre-qualified under this procedure. 6130.6. Packaging and Labeling. Package the adhesive in self-releasing cardboard containers with essentially flat and parallel top and bottom surfaces such that the packages will stack properly. Each package must have a net weight of either 23 or 27 kg (50 or 60 lb.) and must weigh within 1 kg (2 lb.) of the stated quantity. Self-releasing cardboard dividers, which will separate each package into sections weighing no more than 7 kg (15 lb.) each, must be part of the packaging. Each package must display: • the manufacturer's name, • net weight, • lot or batch number, and • a product name that clearly identifies the material as either standard or flexible bituminous marker adhesive. 6130.7. Archived Versions. Archived versions are available. TEXAS DEPARTMENT OF TRANSPORTATION 3-3 LAST REVIEWED:SEPTEMBER 2014 SECTION 026202 HYDROSTATIC TESTING OF PRESSURE SYSTEMS 1. DESCRIPTION This specification shall govern all work necessary for hydrostatic testing the completed pressure system. The Contractor shall provide all tools, equipment, materials, labor, etc., as necessary, except as noted, and accomplish all testing under this specification. 2. MATERIALS Water for filling the line and making tests will be furnished by the Contractor through a standard meter connection. A meter and gauges for testing shall be supplied by the Contractor. A test pump with appropriate connector points as approved by the Water Superintendent for the installation of meter and gauge shall be furnished by the Contractor. The meter shall be directly connected to the main or pipe being tested by the use of copper tubing or an approved reinforced hose. The meter shall be protected against extreme pressures by the use of a one-inch (1") safety relief valve set at the test pressure plus ten pounds per square inch(psi) and furnished by the Contractor. 3. TEST PROCEDURE Tests shall be made only after completion of backfill as specified, and not until at least thirty-six (36)hours after the last concrete thrust block has been cast. Contractor shall coordinate hydrostatic testing with the proposed construction sequencing and phasing. Each section of pipeline shall be slowly filled with water and the specified test pressure, measured at the point of lowest elevation, shall be applied. During the filling of the pipe and before applying the specified test pressure, all air shall be expelled from the pipeline. During the test, all exposed pipe, fittings,valves,hydrants and joints shall be carefully examined. If found to be leaking, they shall be corrected immediately by the Contractor. If the leaking is due to cracked or defective material, the defective material shall be removed and replaced by the Contractor with sound material. All pipes shall be subjected to two hydrostatic tests. The first hydrostatic test shall be a two-hour test at a pressure of 150 psi. The second test shall be no less than 48 hours after successful completion of the first hydrostatic test. The second hydrostatic test shall be for a 24-hour period at City operating pressure for waterlines or at 50 psi for wastewater force mains and effluent lines. 026202 Page 1 of 2 Rev.10-30-2014 The maximum allowable leakage shall be as follows: Ductile Iron Pipe, AWWA C600 L= SD P iI- o�^ L=ND P 'Z 133,200 7,400 Asbestos- Cement Pipe, AWWA C603 L=ND P 'Z 4,000 PVC Pipe-Uni-bell equation 99 L=ND P 'Z 7,400 WHERE: L=Maximum Allowable Leakage(gallons/hour) S =Length of Pipe Tested(feet) N=Number of Joints in Tested Line (pipe and fittings) D =Nominal Diameter of Pipe(inches) P=Average Test Pressure (psi) If the pressure system fails to meet the leakage requirements, the Contractor shall make the required repairs to the system and the system shall be retested. This procedure shall be repeated until the system complies with leakage requirements. The cost of each retest shall be $100. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, hydrostatic testing of pressure systems will not be measured for pay,but shall be subsidiary to the installation of the pressure system component. 026202 Page 2 of 2 Rev.10-30-2014 SECTION 026206 DUCTILE IRON PIPE AND FITTINGS 1. DESCRIPTION This specification shall govern all work necessary for furnishing all ductile iron pipe and fittings required to complete the project. 2. GENERAL All ductile iron pipe shall conform to AWWA C151. The interior of pipe and fittings (excluding fittings for wastewater force mains)shall have a shop-applied cement-mortar lining(40 mils thick)in accordance with AWWA C104. The exterior of pipe and fittings shall have a coating of coal tar enamel of approximately 1 mil thick or as specified in AWWA C105. Ductile iron pipe shall be wrapped in two plys of 8-mil polyethylene in accordance with Section 026402 "Waterlines" of the City Standard Specifications. 3. FITTINGS All fittings shall be ductile iron and in accordance with AWWA C153. Fittings shall have apressure rating of 250 psi for sizes through 12" and 150 psi for 14" and larger sizes,unless shown differently on the drawings. Unless noted otherwise on the drawings, Mechanical Joints shall be used. 4. JOINTS Joints for pipe shall be mechanical type or push-on type such as "Tyton Joint", or approved equal; joints for fittings shall be mechanical joints, unless shown otherwise on the drawings. Mechanical joints shall conform to AWWA C153. Mechanical joints shall be furnished complete with joint material, Cor-ten nuts, Cor-ten bolts, glands and gaskets. When restrained joints are indicated on the drawings, restrained joints for pipe and fittings of 12" diameter and less shall be mechanical joint with retainer gland Series 1100 by EBAA Iron or approved equal,with a minimum of 250 psi rated working pressure. Restrained joints for pipe and fittings over 12"in diameter shall be push on type with a retainer ring as LOK-RING or FLEX-RING by American Ductile Iron Pipe, or TR FLEX by U.S. Pipe, or approved equal. Gaskets shall be of synthetic rubber. An analysis of the material used in each size gasket showing the type of synthetic rubber and that no natural rubber is present shall be supplied. 026206 Page 1 of 3 Rev.10-30-2014 5. PIPE Pressure class ductile iron pipe requirements: Pressure Wall Range of Maximum Diameter Class Thickness Allowable Depth Cover (inches) (psi) (inches) (feet) - (feet) A - B* 44 350 0.25 60+ 6 350 0.25 30 - 65 8 350 0.25 20 - 50 104 350 0.26 15 - 45 12 350 0.28 15 - 44 144 300 0.30 13 - 42 16 300 0.32 13 - 39 18 300 0.34 13 - 36 20 300 0.36 13 - 35 24 250 0.37 11 - 29 24+ x x x * Range of maximum allowable depth of pipe where: A = Ground water, or unstable bottom, or quick condition. B = Ideal trench conditions, and sand encasement is at an average density in excess of 90% Standard Proctor density. 4 Pipe sizes not typically specified on City projects, but shown for reference. x Requires special evaluation. The face of bells shall be plainly marked by color coding for classes so as to be readily identified in the field. 6. CERTIFICATIONS A certification shall accompany each order of pipe and fittings furnished to job site. Certification shall include the following items: indicate that pipe complies with Part 3 of this specification; indicate that fittings and joints comply with Part 4 of this specification(it should be noted that the supplier shall furnish sufficient technical material for the Engineer to determine whether or not push- on j oints can comply with the "or equal" clause); and a copy of a laboratory analysis of the material used in each size gasket showing the type of synthetic rubber and that no natural rubber is present. 026206 Page 2of3 Rev.10-30-2014 7. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, ductile iron pipe shall be measured by the linear foot along the centerline for each size of pipe installed. Measurement of pipe shall be up to, but not include, the fittings. Ductile iron fittings shall be measured per each by the type and size, as indicated in the Bid Form. Payment shall include all labor, materials, tools and equipment for the completed installation and testing of the waterline,together with all incidentals necessary to install the pipe and fittings complete in place. 026206 Page 3 of 3 Rev.10-30-2014 SECTION 026210 POLYVINYL CHLORIDE PIPE (AWWA C900 and C905 Pressure Pipe for Municipal Water Mains and Wastewater Force Mains) 1. DESCRIPTION This specification shall govern all work necessary for furnishing all PVC pipe (AWWA C900 and C905)required to complete the project. 2. MATERIAL PVC pipe shall be made of Class 12454-A or Class 12454-B virgin compounds, as defined in ASTM D 1784 with an established hydrostatic-design-basis of 4000 psi for water at 73.4 degrees F. 3. DIMENSIONS Pipe shall be manufactured to ductile iron pipe equivalent outside diameters. 4. JOINT Pipe shall have a gasket bell end with a thickened wall section integral with the pipe barrel. The use of solvent weld pipe shall not be allowed. 5. GASKETS Gaskets for jointing pipe shall be in accordance with ASTM F477 (High Head). 6. PIPE PRESSURE CLASS AND DIMENSION RATIO Unless indicated otherwise on the drawings, pipe shall have a dimension ratio (DR) of 18 and in accordance with: Pipe Size Designation 4" to 12" AWWA C900 Over 12" AWWA C905 7. CAUSE FOR REJECTION Pipe shall be clearly marked in accordance with AWWA Requirements. Unmarked or scratched pipe shall be rejected. 026210 Page 1 of 2 Rev.3-25-2015 8. CERTIFICATION The contractor shall furnish in duplicate to the Engineer a copy of the manufacturer's affidavit of compliance with this specification, to include gaskets. Certification shall accompany each delivery of materials. 9. MEASUREMENT AND PAYMENT Unless otherwise specified in the Bid Form, PVC pipe (AWWA C900 or C905) will be measured by the linear foot along the centerline for each size of pipe installed. Measurement of pipe shall be up to,but not include, the fittings. Payment shall include all labor, materials, tools and equipment for the completed installation, backfilling and testing of the PVC pipe, together with all incidentals necessary to install the pipe complete in place,per linear foot. 026210 Page 2 of 2 Rev.3-25-2015 SECTION 026214 GROUTING ABANDONED UTILITY LINES 1. DESCRIPTION This specification shall govern all work and materials required for grouting abandoned utility lines in place. 2. MATERIALS A. Flowable Grout: Flowable grout (or flowable fill) shall consist of a mixture containing Portland cement, fly ash, sand, water, and "Darafill" admixture (or approved equivalent), in the amounts shown below (or otherwise proportioned to provide 100 psi compressive strength at 28 days), to achieve a paste-like consistency immediately prior to placing the flowable grout. The flowable grout mixture shall be supplied by an approved ready-mix supplier. The manufacturer's representative shall be consulted for any final adjustments to improve the flowability of the mixture. Commercially produced flowable grout may be used with approval of the Engineer. 100 lbs/ CY Portland Cement 300 lbs/ CY Fly Ash 2100 lbs/ CY Sand 250 lbs/ CY Water 6 oz/CY "Darafill" admixture, as manufactured by Grace Construction Products, or approved equivalent. B. Raw Soil: Soil shall be typical clayey soil of the area. It shall be from the project site or other approved source not suspected of being contaminated. The soil shall have a Plasticity Index over 15 and a Liquid Limit not to exceed 65. C. Lime: Lime shall be hydrated lime, calcium hydroxide, in accordance with AASHTO M 216. D. Water: Water shall be potable. 3. CONSTRUCTION METHODS A. Flowable Grout: Mix Portland cement, sand, fly ash, "Darafill" and water in the amounts shown above to achieve a paste-like consistency immediately prior to placing flowable grout. B. Soil-Lime Mix Design: The following is given as a typical mix design for soil-lime mixture for trial mix. The mix design is based on damp soil with an initial water content of about 15%. The proportions of soil and lime shall not be altered. The Contractor shall determine the amount of water to be added as required to produce a mix at its liquid limit. 026214 Page 1 of 2 Rev.10-30-2014 Trial Mix Design: Damp Soil 1000 lb. Lime 50 lb. Water(approximate) 48 gal. Consistency shall be checked with liquid limit apparatus. C. Placement: The Contractor shall grout abandoned lines as indicated on the drawings. Temporary pumping and venting ports shall be placed as required to provide complete filling of the abandoned line and proper placement of the grout. If segregation or "sand packing" is experienced during pumping, the Contractor shall reduce the water content of the mix or obtain other soil source (for soil-lime mixture), as required. Any damage resulting from pumping operation shall be repaired at the Contractor's expense. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, grouting abandoned utility lines shall be measured by the linear foot of abandoned-in-place pipe. Payment shall be full compensation for all labor, equipment, materials and incidentals required to mix, transport, and place the grout and restore surface at pump ports. 026214 Page 2 of 2 Rev.10-30-2014 SECTION 026402 WATERLINES 1. DESCRIPTION This specification, in conjunction with the City of Corpus Christi's Water Distribution System Standards, shall govern all work necessary for the installation of all waterline facilities required to complete the project. 2. MATERIALS Concrete: Concrete shall have a minimum compressive strength of 3000 psi at 28 days. Bedding Sand for Encasement: Bedding sand and initial backfill around the pipe shall be granular material of low plasticity as indicated on the drawings. Ductile Iron Pipe and Fittings: See City Standard Specification Section 026206. Polyvinyl Chloride Pipe: See City Standard Specification Section 026210. Tapping Sleeves and Valves: See City Standard Specification Section 026409. Gate Valves for Waterlines: See City Standard Specification Section 026411. Fire Hydrants: See City Standard Specification Section 026416. 3. CONSTRUCTION METHODS (1) HANDLING MATERIALS a) General: The Contractor shall be responsible for the safe storage of all materials furnished to, or by him, and accepted by him, until it has been incorporated into the completed project. All material found during the progress of the work to have cracks, flaws or other defects will be rejected, and the Contractor shall remove such defective material from the site of the work. b) Unloading and Distribution of Materials at Work Site: Pipe and other materials shall be unloaded at point of delivery, hauled to and distributed at the job site by the Contractor. Materials shall at all times be handled with care and in accordance with manufacturer's recommendations. Care shall be taken not to scratch PVC pipe. Excessive scratching shall be considered cause for rejection of PVC pipe. Materials may be unloaded opposite or near the place where it is to be installed provided that it is to be incorporated into the work within 10 days. The Contractor shall not distribute material in such a manner as to cause undue inconvenience to the public. 026402 Page 1 of 5 Rev.3-25-2015 c) Storing Materials: Materials that are not to be incorporated into the work within 10 days shall be stored on platforms. The interior of pipes and accessories shall be kept free from dirt and foreign matter. (2) ALIGNMENT AND GRADE a) General: All pipes shall be laid and maintained to the required lines and grades. Fittings, valves and hydrants shall be at the required locations with joints centered, spigots home and all valve and hydrant stems plumb. Temporary support and adequate protection of all underground and surface utility structures encountered in the progress of the work shall be furnished by the Contractor. Where the grade or alignment of the pipe is obstructed by existing utility structures such as conduits, ducts,pipes, connections to sewers or drains, the obstruction shall be permanently supported, relocated, removed, or reconstructed by the Contractor at the Contractor's expense, in cooperation with the owners of such utility structures. One (1) 20-ft. section of waterline pipe shall be centered over/under gravity wastewater line at all gravity wastewater line crossings. Waterline shall be ductile iron pipe with mechanical joint fittings, in accordance with City Standard Specification Section 026206,wherever new waterline crosses under new gravity wastewater line. Maintain a minimum of six inches (2 feet usual)vertical clearance between outsides of pipes where a new waterline crosses over a new wastewater line. Maintain a minimum of twelve inches vertical clearance between outsides of pipes where a new waterline crosses under a new wastewater line. Alternatively, at gravity wastewater line crossings, the proposed PVC waterline may be encased in a 20-ft.joint of ductile iron pipe with a minimum pressure rating of 150 psi that is at least two nominal sizes larger than the carrier pipe. The carrier pipe shall be supported in the casing at five foot (5') intervals with spacers, or shall be filled to the spring line with clean washed sand, graded as shown in the City Standard Water Details. The casing pipe shall be centered under the gravity wastewater line as indicated on the drawings, and both ends of the casing shall be sealed with cement grout or manufactured seal. b) Deviation from Drawings: No deviation from the line and grade shown on the plans may be made without the written consent of the Engineer. c) Depth of Cover: Depth of cover will be measured from the established street grade or the surface of the permanent improvement, or from finished grade to the top of the pipe barrel. Unless otherwise shown on drawings, the minimum depth of cover shall be 36 inches. Waterlines 12" and larger located under streets shall have 48 inches of cover at all points. 026402 Page 2 of 5 Rev.3-25-2015 (3) TRENCH EXCAVATION AND BACKFILL See City Standard Specification Section 022020, "Excavation and Backfill for Utilities"and applicable City Standard Details for Water. (4) POLYETHYLENE WRAPPING All ductile iron pipe, valves and fittings, except pipe or valves which are laid in encasement pipe or in concrete valve boxes, shall be wrapped in polyethylene. The polyethylene material shall have a thickness of 8 mils and may be either clear or black. The wrapping shall be lapped in such manner that all surfaces of pipe, valves and fittings, including joints, shall have a double thickness of polyethylene. If a single longitudinal lap is made using a double thickness of polyethylene, it shall be lapped a minimum of 18 inches and the lap shall be placed in the lower quadrant of the pipe and in such a manner that backfill material cannot fall into the lap. The polyethylene shall be secured in place with binder twine at not more than 6-foot intervals. If wrapping is applied before the pipe is placed in the trench, then special care shall be taken in handling the pipe so that the wrapping will not be damaged. Care shall also be exercised in backfilling around the pipe and fittings and in blocking fittings so as not to damage the wrapping. Any wrapping that may be damaged shall be repaired in a manner satisfactory to the Engineer and so as to form the best protection to the pipes. (5) SAND ENCASEMENT All pipe and fittings that are not enclosed in concrete valve boxes or laid in encasement pipe, shall be completely encased with a minimum of eight inches (8") of sand on the bottom and sides of waterlines smaller than 16 inches in diameter, and twelve inches (12") over the top of the waterline, unless otherwise indicated on the drawings. This encasement includes the bottom, sides and top of pipe and fittings including bells, so that all portions will be encased with sand to insulate the pipe from the natural ground and from the backfill. The sand shall be compacted to a minimum of 90% Standard Proctor density. Provide twelve inches (12") of sand encasement all around the pipe for 16-inch diameter and larger waterlines. Sand shall be placed in a manner that will not injure the polyethylene wrapping and shall be compacted under, around the side, and over the pipe in a manner that will reduce settlement to a minimum and as approved by the Engineer. In order to reduce the amount of sand required, the trench bottom may be excavated in a rounded manner so as to maintain at least a minimum of eight inches of sand between the excavation and the pipe (twelve inches for 16-inch diameter and larger waterlines), unless otherwise indicated on the drawings. (6) LOWERING PIPE AND ACCESSORIES IN THE TRENCH a) General: The trench shall be excavated true and parallel to the pipe center line with a minimum clearance of eight inches below the pipe bottom and with a like clearance 026402 Page 3 of 5 Rev.3-25-2015 from the bottom of the bell to the bottom of the bell hole. The trench shall then be refilled to the proper grade with sand as specified. The placing of the encasing material shall be done in such a manner so as to be free of all natural soil rock or other foreign matter. After final grading in the trench of the encasing material, bell holes shall be excavated at each joint. Proper implements, tools and facilities satisfactory to the Engineer shall be provided and used by the Contractor for the safe and efficient execution of the work. All pipe, fittings, valves, hydrants and accessories shall be carefully lowered into the trench by means of a derrick, ropes or other suitable equipment, in such a manner as to prevent damage to pipe and fittings. Under no circumstances shall pipe or accessories be dropped or dumped into the trench. b) Inspection of Pipe and Accessories: The pipe and accessories shall be inspected for defects prior to lowering in the trench. Any defective, damaged or unsound pipe shall be replaced. c) Clean Pipe: All foreign matter or dirt shall be removed from the interior of the pipe prior to lowering into the trench. Pipe shall be kept clean both in and out of the trench at all times during the laying. (7) JOINTING PIPES All pipes shall be made up in accordance with manufacturer's recommendation. Pipe deflection shall not exceed 75% of the maximum amount recommended by the manufacturer. (8) CONCRETE THRUST BLOCKS Temporary thrust blocks or other means of carrying thrust loads generated by hydrostatic testing shall be provided at all ends of lines to be tested. Details of the end connections and method of temporary blocking shall be submitted to the Engineer for approval. After satisfactory completion of the hydrostatic testing, this temporary blocking shall be removed so that connections may be made with existing lines. This work is subsidiary to waterline installation and no separate payment will be made for it. Temporary thrust blocks are not allowed for long term use. (9) METAL HARNESS Metal harness, tie rods and clamps, or swivel fittings shall be used to prevent pipe movement. Steel rods and clamps shall be galvanized or otherwise rust proofed, or coated with hot coal tar enamel, then wrapped with two layers of polyethylene wrapping. 026402 Page 4 of 5 Rev.3-25-2015 (10) STERILIZATION a) Fittings: Valves, hydrants and fittings shall be stored on timbers and kept clean. Where soil or other substance has come in contact with the water surfaces of the fittings, the interior shall be washed and sterilized with 2% solution of calcium hypochlorite. b) Pipe: As each joint of pipe is laid, the Contractor, unless otherwise directed by the Engineer, shall throw powdered calcium hypochlorite (70%) through the length of the joint(one pound for each 1,680 gallons of water to give 50 ppm). When the waterline is complete, and before testing, the waterline shall be slowly filled with water between valves and allowed to stand for 48 hours. After the sterilization period is completed, lines shall be flushed by the Contractor under the direct supervision of a representative of the City Water Department. The Engineer will take sample for testing two hours after refilling. If the sample does not pass State Health Department purification standards, the procedure shall be repeated. The entire procedure shall be coordinated under the supervision of the Water Division Superintendent/Engineer. During the sterilization process, valves shall be operated only under the supervision of the Water Division Superintendent/Engineer. There shall be a base fee of$100 paid by the Contractor to the City for each retest that is required. (11) HYDROSTATIC TESTING WATER SYSTEM See City Standard Specification Section 026202, "Hydrostatic Testing of Pressure Systems". (12) WATER SERVICE CONNECTIONS See Standard Specification Section 026404, "Water Service Lines". 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, waterlines will be measured by the linear foot for each size installed. Payment for waterlines will be made under the appropriate pipe material item and shall include, but not be limited to, trenching, dewatering, bedding, pipe (except for fittings), restraints, temporary thrust blocking, backfill, sterilization, and hydrostatic testing. Payment shall be full compensation for all labor, materials, tools, equipment and incidentals required to complete the work. 026402 Page 5 of 5 Rev.3-25-2015 SECTION 026404 WATER SERVICE LINES 1. DESCRIPTION This specification shall govern all work necessary for furnishing and installing water service lines required to complete the project. Water service lines are those lines from the City main to the meter at the property line. 2. MATERIALS GENERAL Service fittings shall have a minimum of 150 psi working pressure rating,unless indicated otherwise. Fittings and materials shall be in accordance with the applicable provisions of AWWA C800. All service connections shall require service clamps. SERVICE CLAMP Service clamps shall be brass saddle with two silicone bronze straps with I.P. thread and have a minimum working pressure rating of 200 psi. The saddle and nuts shall be of 85-5-5-5 brass alloy per ASTM B-62 and AWWA C800. The nuts shall have unitized washers. Straps shall be 5/8 inch high-quality silicone bronze, flattened and contoured to provide a wider bearing surface against the pipe. Clamps shall be comparable to: Ford 202B, Smith Blair 323, Rockwell 323 CORPORATION STOP Corporation stop shall be of brass with I.P. thread inlet and Mueller 110 compression connection outlet designed for Type K copper pipe and be comparable in design to the following: Mueller H-15028 for 1" size Mueller H-15023 for 1-1/2" & 2" sizes 026404 Page 1 of 2 Rev.3-25-2015 ANGLE METER STOP Angle meter stop shall have a Teflon coated bronze ball which rotates within two Buna-N rubber seats. Inlet shall be packed joint for Type K copper and be comparable in design to the following: Ford BA43-342 for V service line with 5/8" x 3/4" or 3/4" meter size Brass gate valve required for 1-1/2" and 2" sizes SERVICE LINE Service line shall be of Type K copper tube or approved one piece SDR9 polyethylene with restrained compression brass fittings and stainless steel inserts. Other products of comparable features and equal quality may be substituted for the above items with approval of the Engineer. 3. CONSTRUCTION METHODS See City Standard Specification Section 022020, "Excavation and Backfill for Utilities ". Service lines shall be placed by the Contractor as indicated on the drawings and as directed by the Engineer. Relocation of existing meters and changeovers to the new system shall be done only under the direct supervision of the City Water Department. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, water service lines shall be measured with the units indicated in the Bid Form for each size of service line. Payment for service lines shall include,but not be limited to, the following: copper tubing, corporation stop, service clamp, angle meter stop, trenching, trench safety, backfilling including pavement repair, testing, flushing, clean-up and site restoration; and shall be full compensation for all labor,equipment,tools and incidentals required for proper installation of the water service lines. 026404 Page 2 of 2 Rev.3-25-2015 SECTION 026409 TAPPING SLEEVES AND TAPPING VALVES 1. DESCRIPTION This specification shall govern all work and materials required for furnishing and installing tapping sleeves, sleeves and valves required to complete the project. 2. MATERIALS Tapping sleeves shall have a Class 125 ANSI B16.1 outlet flange of cast iron, ductile iron or stainless steel. Sleeves shall be of ductile iron or 304 or 316 stainless steel. Lugs, bolts, washers and nuts shall be of 304 or 316 stainless steel. Iron sleeves shall be of the mechanical joint or caulked joint type as manufactured by Mueller, Clow, or approved equal. Stainless steel sleeves shall be of the compression gasket type capable of providing full support of the tapped pipe, as manufactured by Ford, Smith Blair, Romac, or approved equal. Gasket materials shall be of material suitable for potable water systems. Tapping sleeves shall be sized for the type and size of pipe to be tapped. The class of asbestos cement pipe that will most likely be encountered in the water will be Class 200 for pipes 6 inches in diameter and smaller, and Class 150 for larger pipes. It should be understood that existing pipes to be tapped may not be of the type of material and/or size that is shown on the drawings. The proper size and type of tapping sleeve shall be provided and installed regardless of what is encountered. Tapping valves shall conform to AWWA Standards and City Standard Specification Section 026411, "Gate Valves for Waterlines". Valve boxes shall be as described in City Standard Specification Section 026411, "Gate Valves for Waterlines". 3. CONSTRUCTION METHODS Construction methods shall adhere to those set out in City Standard Specification Section 026402 "Waterlines", and City Standard Specification Section 022020 "Excavation and Backfill for Utilities". 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, tapping sleeves and tapping valves shall be measured on a per each basis for each size installed. Payment for tapping sleeves and tapping valves shall include, but not be limited to, furnishing and installing the valves complete in-place including joint materials, cast iron valve box,box extension, cover, concrete collar, and all other related items such as bolting,wrapping, cement-stabilized sand encasing, backfilling and compacting; and shall be full compensation for all labor, material, tools, equipment and incidentals required to properly install the valves as indicated and specified. 026409 Page 1 of 1 Rev.3-25-2015 SECTION 026411 GATE VALVES FOR WATERLINES 1. DESCRIPTION This specification shall govern all work necessary to provide and install all gate valves and valve boxes required to complete the project. 2. MATERIALS Gate Valves All valves shall meet the following requirements. Gate valves shall conform to AWWA Standard C515. 1) The gate valves shall be ductile iron resilient wedge (C515)with non-rising stems. 2) Valve ends shall be flanged or mechanical joint type or a combination of these as indicated or specified. A complete set of joint materials shall be furnished with each valve, except for bell ends and flanges. 3) Valves 16 inches and larger shall be furnished for horizontal installation—lay over. 4) Stem seals shall be the O-ring type on valves through 12-inch size. Valves 16 inches and larger may be equipped with stuffing boxes. 5) Valves shall open left(counter clockwise). Valves over 18 inches shall have the main valve stem furnished with a combination hand wheel and operating nut. 6) Tapping valves to be used with tapping saddles shall have one end mechanical joint. 7) No position indicator will be required. 8) Within 30 days after award of contract, the Contractor shall submit in triplicate, for approval, the following: a) Certified drawings of each size and type of valve 16 inches and larger showing principal dimensions, construction details, and materials used. b) On all size valves, the composition of bronze to be offered for various parts of the valve, complete with minimum tensile strength in psi, the minimum yield strength in psi, and the minimum elongation in 2"per cent. 026411 Page 1 of 2 Rev.3-25-2015 3. CONSTRUCTION METHODS Gate Valves Gate valves shall be installed as indicated on the drawings. Cast Iron Valve Boxes Valve boxes shall be installed as indicated on the drawings. When valves are in the street right-of- way, the top of box shall be set flush with the pavement or surrounding ground. In cultivated areas, the top of box shall be set twelve inches (12")below natural ground and long enough to be raised to natural ground at a future date. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, gate valves for waterlines will be measured as a unit for each gate valve and valve box installed. Payment shall include, but not be limited to, furnishing and installing the valves complete in-place including joint materials, cast iron valve box, box extension, cover, concrete collar, and all other related items such as bolting, wrapping, cement- stabilized sand encasing, backfilling and compacting; and shall be full compensation for all labor, material, tools, equipment and incidentals required to properly install the valves as indicated and specified. 026411 Page 2 of 2 Rev.3-25-2015 SECTION 026416 FIRE HYDRANTS 1. DESCRIPTION This specification shall govern all work necessary to provide all fire hydrants required to complete this project. 2. MATERIALS Concrete: Concrete shall be Class "A" in accordance with Section 030020 "Portland Cement Concrete" of the City Standard Specifications, with a minimum compressive strength of 3000 psi at 28 days. Fire Hydrants: The fire hydrants shall conform to AWWA C502 (or latest edition) standard specifications for fire hydrants for ordinary water works service, except for changes, additions and supplementary details specifically outlined herein: a) Hydrants - Hydrants shall be of the traffic model type equipped with a safety flange or collar on both the hydrant barrel and stem. b) Type of Shutoff- The shutoff shall be of the compression type only. C) Inlet Connection - The inlet shall be ASA A-21.11 1964 mechanical joint for six-inch (6"), Class 150 ductile iron pipe. A complete set of joint material shall be furnished with each hydrant. d) Delivery Classifications -Each hydrant shall have two hose nozzles and one pumper nozzle. e) Bury Len_ h- The hydrants shall be furnished in the bury length as indicated on drawings. f) Diameter (Nominal Inside) of Hose and Pumper Nozzles - The hose nozzles shall be two and one-half inches (2-1/2") inside diameter and the pumper nozzle shall be four inches (4") inside diameter. g) Hose and Pumper Nozzle Threads - The hose nozzles shall have two and one-half-inch (2-1/2")National Standard thread (7-1/2 threads per inch). The pumper nozzle shall have size (6) threads per inch with an outside diameter of 4.658 inches, pitch diameter of 4.543 inches, and a root diameter of 4.406 inches. h) Harnessing Lugs -None required. i) Nozzle Cap Gaskets -Required. j) Drain Openings -Required. 026416 Page 1 of 3 Rev.3-25-15 k) Tapping of Drain Opening- Tapping of the drain opening for pipe threads is not required. 1) Nozzle Chain-Not required. m) Direction to Open- The hydrants shall open left(counter clockwise). n) Color of Finish Above Ground Line - That portion of the hydrant above the ground line shall be painted chrome yellow. o) Shape and Size of Operating and Cap Nuts - The operating and cap nuts shall be tapered pentagon one and one-fourth inches (1-1/4") point to face at base and one and one-eighth inches (1-1/8")point to face at top of nut. p) Nozzle Cap Chains -Hydrants shall be furnished without nozzle cap chains. q) Size of Fire Hydrant - The main valve opening shall not be less than five and one-quarter inches (5-1/4")inside diameter. r) Valve Facing - The main valve facing of the hydrant shall be rubber with 90± Durometer hardness. When the main valve lower washer and stem nut are not an integral casting then the bottom stem threads shall be protected with a bronze cap nut and a bronze lock nut. S) Barrel Sections - The hydrant shall be made in two or more barrel sections with flanges connecting the barrel to the elbow and to the packing plate. t) Breakable Coupling - Hydrants shall be equipped with a breakable coupling on both the barrel section and the stem. The couplings shall be so designed that in case of traffic collision the barrel and stem collar will break before any other part of the hydrant breaks. u) Hydrant Adjustment - The hydrant shall be designed as to permit its extension without excavating after the hydrant is completely installed. v) Breakable Collars, Barrel and Stem - Weakened steel or weakened cast iron bolts that are used in the breakable barrel couplings will not be acceptable. w) Operating Stem- Stems that have operating thread located in the waterway shall be made of manganese bronze, Everdure, or other high quality non-corrodible metal. Stems that do not have operating threads located in the waterway must be sealed by a packing gland or "O"-ring seal located between the stem threads and waterway. Iron or steel stems shall be constructed with a bronze sleeve extending through the packing or "O"-ring seal area. The sleeve shall be of sufficient length to be in the packing gland "O"-ring seal in the both open and closed positions of the main valve. The sleeve shall be secured to the steel stem so as to prevent water leakage between the two when subjected to 300 pounds hydrostatic test pressure. 026416 Page 2 of 3 Rev.3-25-15 x) Drain Valve Mechanism - Drain valves operating through springs or gravity are not acceptable. y) Operating Stem Nut - The operating stem nut shall be designed to prevent seepage or rain, sleet, and the accumulation of dust between the operating nut and the hydrant top. Z) Packing Gland or "O"-Ring g Seal - Fire hydrants having the threaded part of the stem at the hydrant top shall be equipped with a packing gland or an "O"-ring seal immediately below the threaded section of the stem. 3. CONSTRUCTION METHODS Fire hydrants shall be installed as shown on drawings. Minimum burial length shall be 3 feet. Breakable couplings shall be located at least 2 inches and less than 6 inches above finish grade. Hydrants and fittings shall be stored on timber and kept clean. The interior surfaces of hydrants and fittings shall be washed and sterilized with approved sterilizing agent, if requested by the Engineer at the time of installation. 4. CERTIFICATION The manufacturer shall furnish to the Engineer two (2) certified sets of prints showing complete details and dimensions of the hydrant. The manufacturer shall furnish to the Engineer one (1) certified copy of the physical tests of all metals used in the manufacture of the fire hydrant that is normally manufactured and that will meet these specifications. 5. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, fire hydrants will be measured as a unit per each. Payment shall include, but not be limited to, furnishing and installing the complete fire hydrant assembly with valve, 6-inch line and fitting on the main; and shall be full compensation for all labor,materials, tools, equipment and incidentals required to properly complete the work. 026416 Page 3 of 3 Rev.3-25-15 SECTION 027202 MANHOLES 1. DESCRIPTION This specification shall govern the furnishing of all materials and construction of manholes composed of a concrete base and concrete walls as shown on the drawings, to the lines, grades and dimensions shown on drawings or established by the Engineer. 2. MATERIALS Concrete for cast-in-place storm water manholes and storm water junction boxes shall be Class C (3,600 psi at 28 days). Manholes for wastewater shall be made from fiberglass only,in accordance with City Standard Specification Section 027205 "Fiberglass Manholes". Mortar for plastering shall be one (1)part Portland cement to three (3) parts clean hard and sharp mortar sand, free of all foreign substances or injurious alkalis. Reinforcing steel, where used, shall conform to the requirements of Section 032020 "Reinforcing Steel". All wastewater manhole rings and covers for streets shall be East Jordan Iron Works, Inc. product V1430 CV or V1420/1480 Z 1, or pre-approved equal, and shall have the seating surface of ring and cover machined to secure a snug fit per the City Standard Wastewater Details. All storm water manholes shall be East Jordan Iron Works,Inc.product VI 168 assembly,and for school zones shall be a bolted assembly per the City Standard Storm Water Details. Steps are not required for wastewater and storm water manholes. Joint material for precast concrete manholes shall be Ram-Nek Flexible Plastic Gaskets as manufactured by K. T. Snyder Company, Houston, Texas, or an approved equal. 3. EXCAVATION The Contractor shall do all necessary excavation for the various manholes, conforming to size and dimensions shown on plans plus a maximum of four(4)feet working room. Excavation shall not be carried to greater depth than required. Subgrade under manhole footings shall be compacted to not less than 95% Standard Proctor density. Shoring shall be the responsibility of the Contractor and shall be installed as necessary. Shoring shall not be removed or backfilled around until entire manhole is completed, unless authorized by the Engineer. Shoring shall remain in place at least twenty-four(24)hours after concrete work has been completed. 027202 Page 1 of 3 Rev.3-25-2015 4. CONCRETE MANHOLES (STORM WATER ONLY) (1) Formed-in-Place Manholes: Where formed concrete is used, forms shall be built to dimensions shown on the standard details. Inserts and openings shall be formed so concrete will not be injured during process of stripping forms. Forms shall be braced and tied to prevent spreading or bulging, and shall meet approval of the Engineer prior to placing concrete. Forms shall remain in place for minimum of twenty-four(24)hours, and shall be removed within a maximum time of seven (7) days after completion of concrete work. Reinforcing steel, if required, shall be as shown on the plans. The bottom of manholes shall be carefully formed and inverted smoothly when finished, with pipes cut to fit inside surface of walls. (2) Precast Manholes Precast manholes shall allow unobstructed view of all pipes connected to the manhole. Precast manholes shall be designed to support HS-20 traffic loading and designed by a Texas licensed professional engineer. The upper 18 inches of the corbel shall be brick to facilitate subsequent grade adjustment. Either concentric or eccentric cones may be required. Where not specified,eccentric cones shall be used. Manhole designs shall be submitted for approval by the Engineer. 5. GENERAL CONSTRUCTION METHODS All items shall be installed as the work progresses and as shown on the standard details. Work shall be completed and finished in a careful workmanlike manner,with special care being given to sealing joints around all pipe extending through walls of the manholes. After finishing walls,the bottom of the manhole shall be completed by adding sufficient concrete to shape the bottom in conformity with requirements on the plans. Where old manholes are adjusted to meet new lines and grades, all old masonry or concrete shall be thoroughly cleaned and wetted before joining new masonry or concrete to it. HDPE adjustment rings are to be used to match roadway grade. A maximum of 18" of adjustment rings may be utilized. 6. BACKFILLING/LEAKAGE TESTING Backfilling around the manholes shall commence as soon as concrete or masonry has been allowed to cure the required time and forms and shoring have been removed. Backfill shall be placed in layers of not more than six inches (6") and compacted to a minimum of 95% Standard Proctor density before next layer is installed. Wastewater manholes shall withstand a leakage test not to exceed the values stated in City Standard Specification Section 027205 "Fiberglass Manholes", except that an additional 10 percent of loss will be permitted for each additional two feet head over a basic two-foot internal head. 027202 Page 2 of 3 Rev.3-25-2015 7. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, manholes shall be measured by each individual structure built, and paid for at the unit price bid per each, of the size, type and depth specified, complete in-place, and meeting the approval of the Engineer. "Complete in-place" shall mean all labor, materials, tools, equipment and incidentals necessary to furnish and install the manholes, excavation,compaction,backfilling,dewatering,concrete foundation,connections,adjustment rings, ring and cover, concrete work, leakage testing,video inspection, and adjust the manholes to finish grade. Extra depth for wastewater manholes over six feet in depth shall be measured by the vertical foot and shall be paid for at the price bid per vertical foot for "Extra Depth for Manholes". Rehabilitation of existing manholes with fiberglass inserts shall be measured by each individual structure rehabilitated, and paid for at the unit price bid per each, of the size, type and depth specified, complete in-place, and meeting the approval of the Engineer. "Complete in-place" shall mean all labor,materials,tools, equipment and incidentals necessary to furnish and install the rigid fiberglass manhole inserts,make connections,grout the annular space,backfilling,adjustment rings, ring and cover, concrete work, leakage testing, and adjust the manholes to finish grade. 027202 Page 3 of 3 Rev.3-25-2015 SECTION 027402 REINFORCED CONCRETE PIPE CULVERTS 1. DESCRIPTION This specification shall govern the furnishing and placing of reinforced concrete pipe culverts and the material and incidental construction requirements for reinforced concrete pipe sewers. The culvert pipe shall be installed in accordance with the requirements of these specifications to the lines and grades shown on the plans, and shall be of the classes, sizes and dimensions shown thereon. The installation of pipe shall include all joints or connections to new or existing pipe, headwalls, etc., as may be required to complete the work. 2. MATERIALS 1. General. Except as modified herein, materials, manufacture and design of pipe shall conform to ASTM C-76 for Circular Pipe. All pipe shall be machine made or cast by a process which will provide for uniform placement of the concrete in the form and compaction by mechanical devices which will assure a dense concrete. Concrete shall be mixed in a central batch plant or other approved batching facility from which the quality and uniformity of the concrete can be assured. Transit mixed concrete will not be acceptable for use in precast concrete pipe. 2. Design. All pipe shall be Class III (Wall "B") unless otherwise specified on the plans. The shell thickness, the amount of circumferential reinforcement and the strength of the pipe shall conform to the specified class as summarized in ASTM C-76 for Circular Pipe. 3. Sizes and Permissible Variations. a. Variations in diameter, size, shape, wall thickness, reinforcement, placement of reinforcement, laying length and the permissible underrun of length shall be in accordance with the applicable ASTM Specification for each type of pipe as referred to previously. b. Where rubber gasket pipe joints are to be used, the design of the Joints and Permissible Variations in Dimensions shall be in accordance with ASTM C-443. 4. Workmanship and Finish. Pipe shall be substantially free from fractures, large or deep cracks and surface roughness. The ends of the pipe shall be normal to the walls and centerline of the pipe within the limits of variations allowed under the applicable ASTM specification. 5. Com. Pipe shall be cured in accordance with the applicable ASTM Specification for each type of pipe as referred to above. 6. Mme. The following information shall be clearly marked on each section of pipe: 027402 Page 1 of 7 Rev.3-25-2015 a. The class of pipe. b. The date of manufacture. c. The name or trademark of the manufacturer. d. Marking shall be indented on the pipe section or painted thereon with waterproof paint. 7. Minimum Age for Shipment. Pipe shall be considered ready for shipment when it conforms to the requirements of the tests specified herein. 8. Inspection. The quality of materials, the process of manufacture, and the finished pipe shall be subject to inspection and approval by the Engineer at the pipe manufacturing plant. In addition, the finished pipe shall be subject to further inspection by the Engineer at the project site prior to and during installation. 9. Causes for Rejection. Pipe shall be subject to rejection on account of failure to conform to any of the specification requirements. Individual sections of pipe may be rejected because of any of the following: a. Fractures or cracks passing through the shell, except for a single end crack that does not exceed the depth of the joint. b. Defects that indicate imperfect proportioning,mixing and molding. c. Surface defects indicating honeycombed or open texture. d. Damaged ends,where such damage would prevent making a satisfactory joint. 10. Repairs. Pipe may be repaired if necessary, because of occasional imperfections in manufacture or accidental injury during the handling, and will be acceptable if, in the opinion of the Engineer, the repairs are sound and properly finished and cured and the repaired pipe conforms to the requirements of the specifications. 11. Rejections. All rejected pipe shall be plainly marked by the Engineer and shall be replaced by the Contractor with pipe that meets the requirements of these specifications. Such rejected pipe shall be removed immediately from the worksite. 12. Jointing Materials. Unless otherwise specified on the plans, the Contractor shall have the option of making the joints by any of the following methods: a. Ram-Nek, a pre-formed plastic base joint material manufactured by K. T. Knyder Company, Houston, Texas, or an approved equal. Use of Talcote as joint material will not be not permitted. Ram-Nek joint material and primer shall be supplied for 027402 Page 2 of 7 Rev.3-25-2015 use on pipe in the following sizes, which is the minimum that will be required. Additional Ram-Nek may be required if, in the opinion of the Engineer, a proper joint is not secured. Pipe Size Primer Per 100 As. Cut Lengths Per Joint 12" 1.5 gals. 11/2 pcs 1" x 2'-5" 15" 1.9 gals. 2 pcs 1" x 2'-5" 18" 2.7 gals. 11/2 pcs 11/2 " x 3'-5" 21" 3.8 gals. 2 pcs 11/2 " x 3'-5" 24" 6.2 gals. 2 pcs 11/2 " x 3'-5" 30" 8.5 gals. 21/2 pcs 11/2 " x 3'-5" 36" 9.5 gals. 3 pcs 13/4" x 3'-5" 42" 12.0 gals. 31/2 pcs 13/4" x 3'-5" 48" 15.0 gals. 4 pcs 13/4" x 3'-5" 54" 20.0 gals. 41/2 pcs 13/4" x 3'-5" 60" 25.0 gals. 5 pcs 13/4" x 3'-5" 66" 30.0 gals. 51/2 pcs 13/4" x 3'-5" 72" 32.0 gals. 6 pcs 2" x 3'-5" 84" 35.0 gals. 7 pcs 2" x 3'-5" b. TYLOX Types "C", "C-P" or "CR" rubber gaskets, as applicable, as manufactured by Hamilton Kent Manufacturing Company, Kent, Ohio, or approved equal. All gaskets, lubricants, adhesives, etc., shall be manufactured, constructed, installed, etc., as recommended by the manufacturer of the rubber gasket material and conform to ASTM Designation: C-443. In addition, the Contractor shall furnish to the City, for approval, manufacturer's brochures detailing the complete use, installation, and specifications of concrete pipe and rubber gaskets before any rubber gasket material is used on the project. All rubber gaskets shall be fabricated from synthetic rubber. c. Cement Mortar is prohibited from jointing pipe except at manholes, pipe junctions, etc., or where specifically approved by the Engineer. d. Geotextile for wrapping pipe joints shall be Class "A" subsurface drainage type in accordance with AASHTO M288. 027402 Page 3of7 Rev.3-25-2015 3. CONSTRUCTION METHODS Reinforced concrete pipe culverts shall be constructed from the specified materials in accordance with the following methods and procedures: 1. Excavation. All excavation shall be in accordance with the requirements of City Standard Specification Section 022020 "Excavation and Backfill for Utilities," except where tunneling or jacking methods are shown on the plans or permitted by the Engineer. When pipe is laid in a trench, the trench, when completed and shaped to receive the pipe, shall be of sufficient width to provide free working space for satisfactory bedding and jointing and thorough tamping of the backfill and bedding material under and around the pipe. The Contractor shall make such temporary provisions as may be necessary to insure adequate drainage of the trench and bedding during the construction operation. Pipe shall be placed such that the identification markings are visible at the top prior to backfill. 2. Bedding. The pipe shall be bedded in accordance with the bedding details shown on the drawings. Bedding shall not be measured for pay,but shall be subsidiary to other work. If the subgrade of the trench is unstable, even if this condition occurs at relatively shallow depths, full encasement of the pipe with crushed stone shall be required. 3. Laying Pipe. Unless otherwise authorized by the Engineer, the laying of pipe on the prepared foundation shall be started at the outlet (downstream) end with the spigot or tongue end pointing downstream, and shall proceed toward the inlet(upstream) end with the abutting sections properly matched, true to the established lines and grades. Where bell and spigot pipe are used, cross trenches shall be cut in the foundation to allow the barrel of the pipe to rest firmly upon the prepared bed. These cross trenches shall be not more than two inches larger than the bell ends of the pipe. Proper facilities shall be provided for hoisting and lowering the sections of pipe into the trench without disturbing the prepared foundation and the sides of the trench. The ends of the pipe shall be carefully cleaned before the pipe is placed. As each length of pipe is laid, the mouth of the pipe shall be protected to prevent the entrance of earth or bedding material. The pipe shall be fitted and matched so that when laid in the bed, it shall form a smooth, uniform conduit. When elliptical pipe with circular reinforcing or circular pipe with elliptical reinforcing is used, the pipe shall be laid in the trench in such position that the markings "TOP" or "BOTTOM" shall not be more than 5 degrees from the vertical plane through the longitudinal axis of the pipe. For pipe over 42 inches in diameter, the Contractor may drill two holes not larger than 2 inches in diameter, in the top of each section of the pipe, to aid in lifting and placing. The holes shall be neatly drilled, without spalling of the concrete, and shall be done without the cutting of any reinforcement. After the pipe is laid, the holes shall be filled with mortar and properly cured, and placed such that they are visible from the top for inspection prior to backfill. Multiple installations of reinforced concrete pipe shall be laid with the center lines of 027402 Page 4 of 7 Rev.3-25-2015 individual barrels parallel. When not otherwise indicated on plans, the following clear distances between outer surfaces of adjacent pipe shall be used. Diameter of Pipe 18" 24" 30" 36" 42" 48" 54" 60" to 84" Clear Distance Between Pipes 0'-9" 0'-11" 1'-1" 1'-3" 1'-5" 1'-7" 1'-1l" 2'-0" 4. Jointing. a. If the use of Portland cement mortar joints is allowed, all pipe shall be jointed tight and sealed with stiff mortar, composed of one part Portland cement and two parts sand, so placed as to form a durable water-tight joint. The installation shall be as required by the Engineer. b. Joints using Rubber Gaskets: Where rubber gasket pipe joints are required by the plans, the joint assembly shall be made according to the recommendations of the gasket manufacturer. Water-tight joints will be required when using rubber gaskets. c. Joints using Cold-Applied Preformed Plastic Gaskets shall be made as follows: A suitable prime of the type recommended by the manufacturer of the gasket joint sealer shall be brush-applied to the tongue and groove joint surfaces and the end surfaces and allowed to dry and harden. No primer shall be applied over mud, sand or dirt or sharp cement protrusions. The surface to be primed must be clean and dry when primer is applied. Before laying the pipe in the trench, the plastic gasket sealer shall be attached around the tapered tongue or tapered groove near the shoulder or hub of each pipe joint. The paper wrapper shall be removed from one side only of the two-piece wrapper on the gasket and pressed firmly to the clean, dry pipe joint surface. The outside wrapper shall not be removed until immediately before pushing the pipe into its final position. When the tongue is correctly aligned with the flare of the groove, the outside wrapper on the gasket shall be removed and the pipe shall be pulled or pushed home with sufficient force and power(backhoe shovel, chain hoist,ratchet hoist or winch) to cause the evidence of squeeze-out of the gasket material on the inside or outside around the complete pipe joint circumference. The extruded gasket material shall be smoothed out over the joint on the exterior and interior of the pipe. Any joint material pushed out into the interior of the pipe that would tend to obstruct the flow shall be removed. (Pipe shall be pulled home in a straight line with all parts of the pipe on line and grade at all times.) Backfilling of pipe laid with plastic gasket joints may proceed as soon as the joint has been inspected and approved by the Engineer. Special precautions shall be taken in placing and compacting backfill to 027402 Page 5of7 Rev.3-25-2015 avoid damage to the joints. When the atmospheric temperature is below 60 degrees F, plastic joint seal gaskets shall either be stored in an area warmed to above 70 degrees F, or artificially warmed to this temperature in a manner satisfactory to the Engineer. Gaskets shall then be applied to pipe joints immediately prior to placing pipe in the trench, followed by connection to previously laid pipe. d. Pipe Joints for storm sewers shall be wrapped with geotextile material. The geotextile wrap shall be at least 2 feet wide and shall be centered on each joint. 5. After the pipe has been placed, bedded and jointed as specified, filling and/or backfilling shall be done in accordance with the applicable requirements of City Standard Specification Section 022020 "Excavation and Backfill for Utilities." If unstable conditions are encountered, fully encase the pipe with crushed stone as described above. When mortar joints are allowed, no fill or backfill shall be placed until the jointing material has been cured for at least six(6)hours. Special precautions shall be taken in placing and compacting the backfill to avoid any movement of the pipe or damage to the joints. For side drain culverts and all other culverts where joints consist of materials other than mortar, immediate backfilling will be permitted. 6. Unless otherwise shown on the plans or permitted in writing by the Engineer, no heavy earth moving equipment will be permitted to haul over the structure until a minimum of 4 feet of permanent or temporary compacted fill has been placed thereon. Pipe damaged by the Contractor's equipment shall be removed and replaced by the Contractor at no additional cost. 7. Cleaning and Television Inspection. All enclosed reinforced concrete pipe and manholes installed on this project shall be cleaned and televised in accordance with City Standard Specification Section 027611 "Cleaning and Televised Inspection of Conduits." 4. MEASUREMENT Unless otherwise specified on the Bid Form, reinforced concrete pipe will be measured by the linear foot. Such measurement will be made between the ends of the pipe barrel along its central axis. Where spurs or branches, or connections to existing pipe lines are involved, measurement of the spur or new connecting pipe will be made from the intersection of its center axis with the outside surfaces of the pipe into which it connects. Where inlets, headwalls, catch basins, manholes,junction chambers, or other structures are included in lines of pipe, that length of pipe tying into the structure wall will be included for measurement but no other portion of the structure length or width will be so included. For multiple pipes, the measured length will be the sum of the lengths of the barrels measured as prescribed above. 027402 Page 6of7 Rev.3-25-2015 5. PAYMENT Payment for reinforced concrete pipe measured as prescribed above will be made at the contract unit price bid per linear foot for the various sizes of 'Reinforced Concrete Pipe" of the class specified. Payment shall be full compensation for furnishing and transporting the pipe; hauling and placing of earth cushion material where required for bedding pipe; for the preparation and shaping of beds; for hauling, placing and jointing of pipes; for furnishing and installing geotextile pipe joint wrapping; for end finish; for all connections to existing and new structures; for cleaning and television inspection; and for all other items of materials, labor, equipment, tools, excavation, backfill and incidentals necessary to complete the culvert or storm sewer in accordance with the plans and these specifications. 027402 Page 7of7 Rev.3-25-2015 SECTION 027604 DISPOSAL OF WASTE FROM WASTEWATER CLEANING OPERATIONS 1. SCOPE: This specification governs all work required for disposal of waste from wastewater cleaning operations required to complete the project. 2. METHODS: Grit,rubble,dislodged bricks and other such inorganic waste that is removed during cleaning shall not be allowed to continue down stream of the operation. Organic solids that remain in suspension would be allowed to continue downstream through the wastewater system. A weir or other suitable trap shall be installed and maintained by the Contractor for the collection of such waste. This material shall be de-watered and delivered by the Contractor to a facility that is authorized to receive it. If this material is free of organic sludge and is sufficiently de-watered to pass the paint filter test,it would be acceptable for disposal at the Elliott Sanitary Landfill subject to prior approval of the facility and the associated disposal fees. The Contractor has the option of using the City's de-watering facilities. The City has six drying beds, each with a 1-foot high containment wall each with an area of about 2,300 square feet. These drying beds are at the Greenwood Wastewater Treatment Plant, 1541 Saratoga. The Contractor would be required to haul and handle the material to, at and from the facility as well as the restoration of drying beds. Restoration of the drying beds includes the removal of all the de- watered material and the replacement of the existing sand bed with new sand. All work required within the treatment plant, including the replacement of sand shall be in accordance with the requirements set forth by the Plant Supervisor. The use of the drying beds would be subject to prior approval of the facility and the associated de-watering fees. If the City's facilities are used for de-watering or disposal of waste, the Contractor shall be responsible for making contact with the appropriate Solid Waste or Wastewater Officials or both, making all arrangements for the use of City facilities, scheduling of delivery and pickup, etc. Materials and handling operations shall meet the requirements set forth by said Officials. Failure to meet these requirements shall be cause for rejection of the materials by either the landfill or the treatment plant operations. Proper disposal of this waste shall be responsibility of the Contractor. The Contractor shall provide the Engineer with written documentation of the proper disposal of this waste. 3. MEASUREMENT & PAYMENT: Unless otherwise specified on the Bid Form,this work shall be considered subsidiary to the project. 027604 Page 1 of 1 Rev.10-30-2014 SECTION 027611 CLEANING AND TELEVISED INSPECTION OF CONDUITS 1. SCOPE This specification shall govern for all work, equipment, supervision and materials required to provide for cleaning and remote CCTV inspection and documentation of wastewater or other lines and manholes as required. 2. TECHNICAL REQUIREMENTS 2.1 General Closed circuit television inspection will typically be done under one or more of the conditions listed below. Requirements for on-screen labeling during each line segment set up, televising, video file labeling and hard copy inspection reports will be specifically addressed. The Contractor shall neither request nor receive assistance from the City, in the performance of work described in this specification. Unless otherwise specified and at Contractors expense, the Contractor shall provide for the control of wastewater flows and monitoring of the collection system for back-ups and surcharges, while flow control devices are in place. It shall be the responsibility of the Contractor(s) to adhere to all applicable OSHA rules and regulations while performing any and all City-related projects or jobs (to include, but not necessarily limited to "Confined Space Entry". 2.2 Inspection Equipment and Methods Electronic media shall be used to record the condition of all the segments of the mains and the manholes, tap locations and unusual situations during inspection. The inspection imaging shall be made on color professional grade DVD format for each line segment. All observations will require both audio and on-screen display. The camera shall transit through the wastewater line in either direction at a speed not greater than 30 feet per minute, stopping as necessary to permit proper documentation of the wastewater line's condition. Lighting for the camera shall be suitable to allow a clear picture of the entire periphery of the pipe. A television camera with pan and tilt capability will be required. The camera, television monitor, and other components of the video systems shall be capable of producing picture quality to the satisfaction of the City. The capture system shall have the capability of recording, digitizing and storing single frames of video images and "real time" live video, as well as collecting, storing and printing wastewater line inspection data for graphic display and report generation. The imaging capture system shall store digitized picture images, have the ability to export picture files to industry standard formats Opg, bmp, and tif), be transferable to DVD and be printed at no cost to the City. Use of proprietary software is discouraged; however, if the Contractor provides the software and 027611 Page 1 of 8 Rev.3-25-2015 three licenses to the City, proprietary software COMPATIBLE with the City's GIS and existing database systems in use may be approved. However, in every case all observations will be recorded using the City approved PACP codes. 2.3 Flow Control/By-Passim This procedure will be used on all previously accepted (City owned) line segments. Except for new wastewater line acceptance inspections, the line shall be dewatered during inspection. A water jet cleaning unit will normally be running in the line in advance of the television camera to allow the highest quality picture available. Dewatering shall remove standing water and fog from the line segment to provide 360 degree view of the pipe being televised. Too high water level or the camera being submerged will be grounds for rejection of the inspection. All wastewater flows from intersecting lines shall typically be controlled through the use of in-line plugs for vacuum trucks and are considered subsidiary to the inspection for all line sizes. Plugs in intersecting lines shall be installed by the Contractor with no assistance from the City. The Contractor shall also monitor the upstream system for back-ups and surcharges, which may lead to Sanitary Sewer Overflows (SSOs). The Contractor shall immediately report to the City Call Center (361) 826-2489 all sanitary sewer overflows. Flow Control devices shall be installed in accordance with all applicable OSHA requirements, including, but not necessarily limited to confined space protocol. 2.4 Evaluation of Existing Lines for Potential Repairs/Rehabilitation—Pre CCTV: Cleaning and televising using a CCTV camera may be needed to traverse each line segment from manhole to manhole as specified in the work order. When an obstruction prevents the camera from proceeding, the obstruction will be recorded on the initial setup and a reverse setup will be attempted to view the pipe and obstruction from the other side. If the camera fails to pass through the entire section, the inspection shall be considered complete and no additional inspection will be required. However, the line segment evaluation form, as well as the graphic report, shall note full line length and the length traveled from each manhole set-up. All inspection efforts on the line segment will be recorded on the same tape / disk. The Contractor must exert all reasonable effort to televise the entire length of a segment of wastewater line, or to assist the repair crews with usable information for point repair. Prior to transiting the line the video display initially is to include upstream and downstream manhole numbers, pipe size / material, adjacent street names and the date. During the transit the display must show the continuous distance from the insertion manhole with an accuracy of +1% of the actual length to help mark observations on the report form. The video must have narrative documentation of notable observations. The Inspection Report shall consist of condition observations recorded using City-approved computer software generated formats, generally conforming to NASSCO and PACP codes. Specifically, items considered notable include: deviations in alignment and grade; abnormal conditions of the pipe barrel and joints; locations 027611 Page 2 of 8 Rev.3-25-2015 and quantities of any sources of infiltration or inflow; dropped, broken, properly/ improperly installed service taps; debris, roots or other impediments to flow and any other condition that may prevent either the proper completion of the inspection, or affect any proposed rehabilitation process. Evaluation of existing lines includes associated manhole inspection. 2.5 Evaluation After Repairs /Rehabilitation Post CCTV: Following repairs or rehabilitation to existing lines (by Contractor), a CCTV camera shall travel through required line segment to televise. The intent of this process is to inspect the interior of the line to determine the location of repairs, and extent of any unacceptable work. Prior to transiting the line the video display initially is to include upstream and downstream manhole numbers, pipe size / material, adjacent street names and the date. During the transit the display must show the continuous distance from the insertion manhole with an accuracy of+/- 1% of the actual length to help mark observations on the report form. Specifically, items such as detailed inspection of the repaired area using pan-and- tilt equipment will be shown in the Inspection Report, including digital photographs of acceptable or inadequate and/or questionable work. The video must include narrative documentation of notable observations, and be cross referenced to the Inspection Report. The Inspection Report shall consist of condition observations recorded using City-approved computer-software generated formats conforming to NASSCO and PACP codes. 2.6 New Pipeline Inspection: Upon completion of the installation of new lines, including any appurtenances such as manholes, service connections, etc., a CCTV camera shall traverse through each completed line segment. The intent of this process is to inspect the interior of the completed line to determine the location of service taps and extent of omissions and/or any unacceptable work on the pipeline or manholes, such as sags, infiltration, gapped joints, protruding gaskets, etc. Prior to transiting the line, the initial video shall initially include the upstream and downstream manhole designations, pipe size, project name and other pertinent information. When inspecting / documenting new wastewater line conditions, the Contractor must conduct a specific inspection for the presence of sags in the newly installed line. The approved method involves the use of an inclinometer on the camera. The belly tolerance is 5% or less for acceptable pipe installation. Any deviation from the 5% belly tolerance limit must be approved by the applicable Utility Operating Department. The graphic report will note the start and stop of sags and approximate maximum depth. During the transit the display must show the continuous distance from the insertion manhole with an accuracy of +1% of the actual length to help mark observations on the Inspection Report form. The video must include narrative documentation of notable observations, and be cross referenced to the Inspection 027611 Page 3of8 Rev.3-25-2015 Report. The Inspection Report shall consist of condition observations recorded using approved computer-software generated formats. Specifically, items such as deviations in alignment and grade causing bellies / sags; abnormal conditions of the pipe barrel and joints; locations and quantities of any sources of infiltration or inflow; dropped, broken, properly/ improperly installed service taps or any other condition that may assist the Utilities Department in determining the quality of the pipeline installation. 2.7 Manhole Inspection: A CCTV camera shall traverse the manhole from top to bottom to record the condition of the manhole and invert for structural condition and sources of infiltration on the manhole and invert. The initial video display must show the entry manhole number, location/street address, date and depth. a. The requirement is to commence capturing video at ground level. The video must be steady while panning and lowering to clearly record condition of the ring, corbel, the walls, and pipeline penetrations. The camera is to rotate during descent to inspect typical conditions and all penetrations. At the bottom of the manhole the complete invert will be inspected / viewed for infiltration and general condition. A washed out picture due to sunlight or shaking will be rejected for payment b. This manhole information may be retained on the same DVD if the line segment is also being investigated, or, if inspection is issued as a separate work order, a separate DVD and report will be required. As with pipeline inspection, digital photographs of key points of note must accompany the report and DVD. These would include seals on pipeline penetration, infiltration locations and other anomalies. c. The format of the Manhole Inspection Report will be as proposed by the Contractor and, following discussion, mutually approved by the Utilities Department and the Contractor. A sample form is included at the end of this specification. It will contain as a minimum: location & LD.number manhole diameter manhole material depth of manhole condition of ring/cover evidence of infiltration condition of walls presence of inflow inhibitor condition of pipe mouths presence of coatings condition of invert location: street/ easement above invert penetrations 2.8 CCTV Set-U: a. A CCTV set-up includes all of the work, equipment, supervision,personnel, and materials needed to traverse a line segment. 027611 Page 4 of 8 Rev.3-25-2015 2.9 CCTV Reverse Set-up: A CCTV reverse set-up is an attempt to view the line segment from the other side due to an obstruction encountered during the initial set-up. 3. CLEANING REQUIREMENTS 3.1 Clean ALL debris such as dirt, gravel, rocks, grease, roots and other organic/inorganic debris from existing lines and manholes to allow for inspection to proceed. The Contractor will be required to clean the line segment using hydraulic equipment. The debris being removed from the pipeline shall be removed from the collection system at the receiving manhole, and not be allowed to be merely moved to the next line segment. Debris shall be properly disposed of in accordance with local, state and federal regulations. The Contractor shall have the option of dewatering debris removed from cleaning operations on this project at the Greenwood WWTP, located at 1541 Saratoga Blvd., Corpus Christi, Texas 78415. The Contractor shall coordinate with the City Utilities Department at all times (see also City Standard Specification Section 027604 Disposal of Waste from Wastewater Cleaning Operations. The City has six drying beds, each with a 1-foot high containment wall each with an area of about 2,300 square feet. The Contractor would be required to haul and handle the material to, at and from the facility as well as the restoration of drying beds. Restoration of the drying beds includes the removal of all the de-watered material and the replacement of the existing sand bed with new sand. All work required within the treatment plant, including the replacement of sand shall be in accordance with the requirements set forth by the Plant Supervisor. The use of the drying beds would be subject to prior approval of the facility and the associated de-watering fees. If the City's facilities are used for de-watering or disposal of waste, the Contractor shall be responsible for making contact with the appropriate Solid Waste or Wastewater Officials or both, making all arrangements for the use of City facilities, scheduling of delivery and pickup, etc. Materials and handling operations shall meet the requirements set forth by said Officials. Contractor shall coordinate with the Wastewater Pre-Treatment Coordinator to acquire the appropriate manifest documentation and shall also provide a copy of the landfill disposal weight ticket/receipt to the Engineer. Failure to meet these requirements shall be cause for rejection of the materials by either the landfill or the treatment plant operations. Proper disposal of this waste shall be responsibility of the Contractor. The Contractor shall provide the Engineer with written documentation 027611 Page 5of8 Rev.3-25-2015 of the proper disposal of this waste. The Contractor shall not be paid until this documentation is provided. 4. DELIVERABLES 4.1 The Contractor is required to provide the Engineer both narrated CCTV DVD and computer software-generated Inspection Report products, as a result of each inspection. Acceptable submissions become the property of the City. a. Quality Control: camera distortion, inadequate lighting, dirty or submerged lens and blurry or hazy pictures determined to be the fault of the Contractor will be cause for rejection of the inspection effort. If the quality of the deliverables does not meet with City approval, the Contractor shall repeat the documenting process at no cost to the City. b. DVD: for each inspection, one properly labeled color, professional grade, DVD, recorded in standard play (SP) mode, will be required. The DVD will display continuous distance from the insertion manhole, and include narrative observations at notable points, with correlating information shown in the Inspection Report. Labeling of the DVD(s)will include, either typed or neatly printed the following information on the dust cover: Project Name Street Name Tape Number Contractor Upstream MH 4 Downstream MH 4 Date Survey/Post/New Work Order 4 Pipe Size Material Project 4 c. Inspection Reports: inspection reports are to be from City-approved and software-generated formats on 81/2" x 11"paper, in color to improve definition of problem areas, and delivered with the DVD. Each report shall include the same information as noted for the DVD labels, plus the following additional information: pipe diameter, pipe material, manhole diameters & depths, whether this is a "reverse" set-up, direction of flow arrow, and total length of the pipeline. Notable observations are to be shown in the report as digital color photos, with up to four images per page. One report is required for each line segment. Note that the final approval for the use of the Contractor's proposed software will be needed before the first inspection. The Contractor shall submit to the City a sample of the proposed report for review and approval by the City. 5. MEASUREMENT AND PAYMENT Unless otherwise specified on the Proposal, Pre-CCTV (Cleaning and Televised Inspection of existing lines to potentially be rehabilitated) and Post CCTV (Televised Inspection for acceptance of new lines or rehabbed lines) of Wastewater Lines shall not be measured for pay, but will be considered subsidiary to the appropriate bid item. 027611 Page 6of8 Rev.3-25-2015 Cleaning and Televised Inspection of Wastewater Lines includes an inspection of all manholes entered, crossed, or associated with the line being inspected. Reverse CCTV Set-Up shall not be allowed for acceptance televising as obstructions should not be encountered in new pipe that would require the Contractor to relocate to another manhole (upstream or downstream) of the original manhole. 027611 Page 7of8 Rev.3-25-2015 SAMPLE TELEVISED INSPECTION REPORT FORM CITY OF CORPUS CHRISTI TELEVISED INSPECTION REPORT DATA REQUIREMENTS [On screen at start of each set-up and on Inspection Report] City's Project Name City's Project Number Contractor/Operator Date/Time Televised DVD Number Upstream MH Location Downstream MH Location Upstream ME Number Downstream ME Number Upstream MH Depth Downstream ME Depth Pipe Size Pre-Rehab TV Y N Evaluation TV Y N Post-Rehab TV Y N Reverse Set-up Y N Pipe Material DISTANCE FROM ENTRY PONT OBSERVATIONS/COMMENTS c. DVD LABELING REQUIREMENTS JOn each DVD] City Project Name Upstream Manhole No. City Project No. Downstream Manhole No. Street Name Pre Post Other DVD No. Date/Time Made Contractor 027611 Page 8 of 8 Rev.3-25-2015 SECTION 028040 SODDING 1. DESCRIPTION This specification shall govern all work necessary for furnishing and placing sod as required to complete the project. 2. MATERIALS Fertilizer: All fertilizer used shall be delivered in bags or containers with clearly marked analysis. A granulated fertilizer shall be used with an analysis of 10-20-10. These figures represent the percent of nitrogen, phosphoric acid and potash nutrients, respectively, as determined by the methods of the Association of Official Agricultural Chemists. The rate of application shall be not less than 350 pounds per acre (7.23 lb. per 100 SY). In the event that it is necessary to substitute a fertilizer with a different analysis, it shall be granulated fertilizer with a lower concentration. The total nutrients applied per unit area shall not be less that the specified amount of each nutrient. Sod: Sod shall consist of live Bermuda grass with thickly matted roots throughout the soil and with a minimum thickness of 3 inches or 0.25 foot, or live St. Augustine with thickly matted roots throughout the soil with a minimum thickness of 1 inch or 0.08 foot. The Contractor shall not use sod where grass is thinned out. Grass shall be mowed and raked to remove all weeds and long stems prior to extraction at the source. Sod and soil shall be kept moist at all times during the sodding process. Care must be taken at all times to retain native soil on the root system. Water: Water shall be free from oils, acids, alkalis, and salts that may inhibit grass growth. Unless indicated otherwise on the drawings, water shall be provided by the City and shall be transported and applied by the Contractor. 3. CONSTRUCTION METHODS Spot Sodding Prior to planting, the area to be sodded shall be graded and shaped. Squares of sod with a minimum width of 3 inches shall be planted in rows on 15-inch centers in both directions. Sod shall be placed so that it is firmly against the bottom of the hole, and the top of the sod shall not be more than 1/2 inch below finished grade. Soil shall be firmly packed against all sides of the sod. Soil shall not be allowed to cover the sod except for soil incidental to raking, provided that the quantity of soil is not enough to hinder the growth. Areas to be spot sodded shall be indicated on the drawing or as directed by the Engineer in field. After sod has been planted, the area shall be fertilized and watered. 028040 Page 1 of 2 Rev.3-25-2015 Block Sodding: Prior to planting, the area to be sodded shall be graded and shaped. Sod blocks shall be uniformly placed over the prepared area. The sodded area shall then be fertilized and watered. After the area is sufficiently dry, the area shall be rolled or tamped to form a thoroughly compacted mat. Any voids in the mats shall be filled with additional sod and tamped. If, in the opinion of the Engineer, slopes may cause displacement, areas to be block sodded shall be indicated on the drawings or as directed by the Engineer in the field. Mulch Sodding: The sod source shall be disked in two directions cutting the sod thoroughly to a depth of not less than 4 inches or more than 10 inches, being careful to avoid having soil containing no grass roots. The disked sod may be windrowed or otherwise handled in a manner satisfactory to the Engineer. The material shall be rejected if not kept in a moist condition. Prior to placing mulch sod, the cut slopes shall be scarified by plowing furrows 4 inches to 6 inches deep along horizontal slope lines at 2-foot vertical intervals. Excavated material from the furrows shall not protrude more than 3 inches above the original surface of the cut. Fertilizer shall be distributed uniformly over the area. The sod shall then be dumped upon the prepared area and spread uniformly to the required approximate thickness shown on the plans. Any section not true to lines and cross section shall be remedied by the addition of sod material. After the sod material has been spread and shaped, it shall be compacted with a corrugated roller of the "Cultipacker" type. All rolling of slope areas shall be on the contour. The area to be mulch sodded shall be indicated on the drawings or as directed by the Engineer in the field. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, spot sodding and block sodding shall be measured by the square yard taken in a horizontal plane. Payment shall include, but not be limited to, excavation, transporting, storing and placing of sod, and application of fertilizer and water. 028040 Page 2 of 2 Rev.3-25-2015 SECTION 030020 PORTLAND CEMENT CONCRETE 1. DESCRIPTION This specification shall govern for the materials used; for the storing and handling of materials; and for the proportioning and mixing of concrete for culverts, manholes, inlets, curb and gutter, sidewalks, driveways, curb ramps, headwalls and wingwalls, riprap, and incidental concrete construction. The concrete shall be composed of Portland cement, aggregates (fine and coarse), admixtures if desired or required, and water,proportioned and mixed as hereinafter provided. 2. MATERIALS (1) Cement The cement shall be either Type I, II or III Portland cement conforming to ASTM Designation: C150,modified as follows: Unless otherwise specified by the Engineer, the specific surface area of Type I and II cements shall not exceed 2000 square centimeters per gram(Wagner Turbidimeter— TxDOT Test Method Tex-310-D). For concrete piling, the above limit on specific surface area is waived for Type II cement only. The Contractor shall furnish the Engineer, with each shipment, a statement as to the specific surface area of the cement expressed in square centimeters per gram. For cement strength requirements, either the flexural or compressive test may be used. Either Type I or II cement shall be used unless Type II is specified on the plans. Except when Type II is specified on the plans, Type III cement may be used when the anticipated air temperature for the succeeding 12 hours will not exceed 60°F. Type III cement may be used in all precast prestressed concrete, except in piling when Type II cement is required for substructure concrete. Different types of cement may be used in the same structure, but all cement used in any one monolithic placement shall be of the same type and brand. Only one brand of each type will be permitted in any one structure unless otherwise authorized by the Engineer. Cement may be delivered in bulk where adequate bin storage is provided. All other cement shall be delivered in bags marked plainly with the name of the manufacturer and the type of cement. Similar information shall be provided in the bills of lading accompanying each shipment of packaged or bulk cement. Bags shall contain 94 pounds net. All bags shall be in good condition at time of delivery. All cement shall be properly protected against dampness. No caked cement will be accepted. Cement remaining in storage for a prolonged period of time may be retested and rejected if it fails to conform to any of the requirements of these specifications. 030020 Page 1 of 13 Rev.10-30-2014 (2) Mixing Water Water for use in concrete and for curing shall be free from oils, acids, organic matter or other deleterious substances and shall not contain more than 1000 parts per million of chlorides as CL nor more than 1000 parts per million of sulfates as SO4. Water from municipal supplies approved by the State Health Department will not require testing, but water from other sources will be sampled and tested before use in structural concrete. Tests shall be made in accordance with the "Method of Test for Quality of Water to be Used in Concrete" (AASHTO Method T26), except where such methods are in conflict with provisions of this specification. (3) Coarse Aggregate Coarse aggregate shall consist of durable particles of gravel, crushed blast furnace slag, crushed stone, or combinations thereof, free from frozen material or injurious amount of salt, alkali, vegetable matter, or other objectionable material either free or as an adherent coating; and its quality shall be reasonably uniform throughout. It shall not contain more than 0.25 percent by weight of clay lumps, nor more than 1.0 percent by weight of shale, nor more than 5 percent by weight of laminated and/or friable particles when tested in accordance with TxDOT Test Method Tex-413-A. It shall have a wear of not more than 40 percent when tested in accordance with TxDOT Test Method Tex-410-A. Unless otherwise specified on the plans, coarse aggregate will be subjected to five cycles of the soundness test in accordance with TxDOT Test Method Tex-411-A. The loss shall not be greater than 12 percent when sodium sulfate is used, or 18 percent when magnesium sulfate is used. Permissible sizes of aggregate shall be governed by Table 4 and Table 1, except that when exposed aggregate surfaces are required, coarse aggregate gradation will be as specified on the plans. When tested by approved methods, the coarse aggregate, including combinations of aggregates when used, shall conform to the grading requirements shown in Table 1. 030020 Page 2 of 13 Rev.10-30-2014 TABLE I Coarse Aggregate Gradation Chart Percent Retained on Each Sieve Aggregate Nominal 21/2 2 1-�/z 1 3/4 1/2 3/8 Grade No. Size In. In. In. In. In. In. In. No. 4 No. 8 1 2 in. 0 0 to 15 60 to 95 to 20 to 80 100 50 2 (467)* 1-/z in. 0 0 30 to 70 95 to to 65 to 100 5 90 4(57)* 1 in. 0 0 40 90 to 95 to to to 100 100 5 75 8 3/8 in. 0 0 to 35 to 90 to 5 80 100 *Numbers in parenthesis indicate conformance with ASTM C33. The aggregate shall be washed. The Loss by Decantation (TxDOT Test Method Tex-406-A)plus the allowable weight of clay lumps, shall not exceed one percent, or the value shown on the plans, whichever is smaller. (4) Fine Aggregate Fine aggregate shall consist of clean, hard, durable and uncoated particles of natural or manufactured sand or a combination thereof, with or without a mineral filler. It shall be free from frozen material or injurious amounts of salt, alkali, vegetable matter or other objectionable material and it shall not contain more than 0.5 percent by weight of clay lumps. When subjected to the color test for organic impurities (TxDOT Test Method Tex-408-A), it shall not show a color darker than standard. The fine aggregate shall produce a mortar having a tensile strength equal to or greater than that of Ottawa sand mortar when tested in accordance with TxDOT Test Method Tex-317-1). Where manufactured sand is used in lieu of natural sand for slab concrete subject to direct traffic, the acid insoluble residue of the fine aggregate shall be not less than 28 percent by weight when tested in accordance with TxDOT Test Method Tex-612-J. When tested by approved methods, the fine aggregate or combination of aggregates, including mineral filler, shall conform to the grading requirements shown in Table 2. 030020 Page 3 of 13 Rev.10-30-2014 TABLE 2 Fine Aggregate Gradation Chart Percent Retained on Each Sieve Aggregate Grade No. 3/8 In. No. 4 No. 8 No. 16 No. 30 No. 50 No. 100 No. 200 1 0 0 to 5 0 to 20 15 to 50 35 to 75 70 to 90 90 to 100 97 to 100 NOTE 1: Where manufactured sand is used in lieu of natural sand, the percent retained on the No. 200 sieve shall be 94 to 100. NOTE 2: Where the sand equivalent value is greater than 85, the retainage on the No. 50 sieve may be 70 to 94 percent. Fine aggregate will be subjected to the Sand Equivalent Test (TxDOT Test Method Tex-203-F). The sand equivalent shall not be less than 80 nor less than the value shown on the plans, whichever is greater. For concrete Classes `A' and `C', the fineness modulus as defined below for fine aggregates shall be between 2.30 and 3.10. The fineness modulus will be determined by adding the percentages by weight retained on the following sieves, and dividing by 100; Nos. 4, 8, 16, 30, 50 and 100. (5) Mineral Filler Mineral filler shall consist of stone dust, clean crushed sand, or other approved inert material. (6) Mortar(Grout) Mortar for repair of concrete shall consist of 1 part cement, 2 parts finely graded sand, and enough water to make the mixture plastic. When required to prevent color difference, white cement shall be added to produce the color required. When required by the Engineer, latex adhesive shall be added to the mortar. (7) Admixtures Calcium Chloride will not be permitted. Unless otherwise noted, air-entraining, retarding and water-reducing admixtures may be used in all concrete and shall conform to the following requirements: A "water-reducing, retarding admixture" is defined as a material which, when added to a concrete mixture in the correct quantity, will reduce the quantity of mixing water required to produce concrete of a given consistency and will retard the initial set of the concrete. A "water-reducing admixture" is defined as a material which, when added to a concrete mixture in the correct quantity, will reduce the quantity of mixing water required to produce concrete of a 030020 Page 4 of 13 Rev.10-30-2014 given consistency. (a) Retarding and Water-Reducing Admixtures. The admixture shall meet the requirements for Type A and Type D admixture as specified in ASTM Designation: C494,modified as follows: (1) The water-reducing retarder shall retard the initial set of the concrete a minimum of 2 hours and a maximum of 4 hours, at a specified dosage rate, at a temperature of 90°F. (2) The cement used in any series of tests shall be either the cement proposed for specific work or a "reference" Type I cement from one mill. (3) Unless otherwise noted on the plans, the minimum relative durability factor shall be 80. The air-entraining admixture used in the referenced and test concrete shall be neutralized Vinsol resin. (b) Air-Entraining Admixture. The admixture shall meet the requirements of ASTM Designation: C260,modified as follows: (1) The cement used in any series of tests shall be either the cement proposed for specific work or a "reference" Type I cement from one mill. (2) Unless otherwise noted on the plans, the minimum relative durability factor shall be 80. The air-entraining admixture used in the referenced concrete shall be neutralized Vinsol resin. 3. STORAGE OF CEMENT All cement shall be stored in well-ventilated weatherproof buildings or approved bins, which will protect it from dampness or absorption of moisture. Storage facilities shall be ample, and each shipment of packaged cement shall be kept separated to provide easy access for identification and inspection. The Engineer may permit small quantities of sacked cement to be stored in the open for a maximum of 48 hours on a raised platform and under waterproof covering. 4. STORAGE OF AGGREGATE The method of handling and storing concrete aggregate shall prevent contamination with foreign materials. If the aggregates are stored on the ground, the sites for the stockpiles shall be clear of all vegetation and level. The bottom layer of aggregate shall not be disturbed or used without recleaning. 030020 Page 5 of 13 Rev.10-30-2014 When conditions require the use of two or more sizes of aggregates, they shall be separated to prevent intermixing. Where space is limited, stockpiles shall be separated by physical barriers. Methods of handling aggregates during stockpiling and subsequent use shall be such that segregation will be minimized. Unless otherwise authorized by the Engineer, all aggregate shall be stockpiled at least 24 hours to reduce the free moisture content. 5. MEASUREMENT OF MATERIALS The measurement of the materials, except water, used in batches of concrete, shall be by weight. The fine aggregate, coarse aggregate and mineral filler shall be weighed separately. Where bulk cement is used, it shall be weighed separately, but batch weighing of sacked cement will not be required. Where sacked cement is used, the quantities of material per batch shall be based upon using full bags of cement. Batches involving the use of fractional bags will not be permitted. Allowance shall be made for the water content in the aggregates. Bags of cement varying more than 3 percent from the specified weight of 94 pounds may be rejected, and when the average weight per bag in any shipment, as determined by weighing 50 bags taken at random, is less than the net weight specified, the entire shipment may be rejected. If the shipment is accepted, the Engineer will adjust the concrete mix to a net weight per bag fixed by an average of all individual weights which are less than the average weight determined from the total number weighed. 6. CLASSIFICATION AND MIX DESIGN It shall be the responsibility of the Contractor to furnish the mix design, using a coarse aggregate factor acceptable to the Engineer, for the class(es) of concrete specified. The mix shall be designed by a qualified concrete technician to conform with the requirements contained herein and in accordance with the THD Bulletin C-11. The Contractor shall perform, at his own expense, the work required to substantiate the design, except the testing of strength specimens, which will be done by the Engineer. Complete concrete design data shall be submitted to the Engineer for approval. It shall also be the responsibility of the Contractor to determine and measure the batch quantity of each ingredient, including all water, so that the mix conforms to these specifications and any other requirements shown on the plans. Trial batches will be made and tested using all of the proposed ingredients prior to placing the concrete, and when the aggregate and/or brand of cement or admixture is changed. Trial batches shall be made in the mixer to be used on the job. When transit mix concrete is to be used, the trial designs will be made in a transit mixer representative of the mixers to be used. Batch size shall not be less than 50 percent of the rated mixing capacity of the truck. Mix designs from previous or concurrent jobs may be used without trial batches if it is shown that 030020 Page 6 of 13 Rev.10-30-2014 no substantial change in any of the proposed ingredients has been made. The coarse aggregate factor shall not be more than 0.82, except that when the voids in the coarse aggregate exceed 48 percent of the total dry loose volume, the coarse aggregate factor shall not exceed 0.85. The coarse aggregate factor shall not be less than 0.70 for Grades 1, 2 and 3 aggregates. If the strength required for the class of concrete being produced is not secured with the cement specified in Table 4, the Contractor may use an approved water-reducing or retarding admixture, or he shall furnish aggregates with different characteristics which will produce the required results. Additional cement may be required or permitted as a temporary measure until the redesign is checked. Water-reducing or retarding agents may be used with all classes of concrete at the option of the Contractor. When water-reducing or retarding agents are used at the option of the Contractor,reduced dosage of the admixture will be permitted. Entrained air will be required in accordance with Table 4. The concrete shall be designed to entrain 5 percent air when Grade 2 coarse aggregate is used and 6 percent when Grade 3 coarse aggregate is used. Concrete as placed in the structure shall contain the proper amount as required above with a tolerance of plus or minus 1.5 percentage points. Occasional variations beyond this tolerance will not be cause for rejection. When the quantity of entrained air is found to be above 7 percent with Grade 2 coarse aggregate or above 8 percent for Grade 3 coarse aggregate, additional test beams or cylinders will be made. If these beams or cylinders pass the minimum flexural or compressive requirements, the concrete will not be rejected because of the variation in air content. 7. CONSISTENCY In cases where the consistency requirements cannot be satisfied without exceeding the maximum allowable amount of water, the Contractor may use, or the Engineer may require, an approved water-reducing or retarding agent, or the Contractor shall furnish additional aggregates or aggregates with different characteristics, which will produce the required results. Additional cement may be required or permitted as a temporary measure until aggregates are changed and designs checked with the different aggregates or admixture. The consistency of the concrete as placed should allow the completion of all finishing operations without the addition of water to the surface. When field conditions are such that additional moisture is needed for the final concrete surface finishing operation, the required water shall be applied to the surface by fog spray only, and shall be held to a minimum. The concrete shall be workable, cohesive, possess satisfactory finishing qualities, and of the stiffest consistency that can be placed and vibrated into a homogenous mass. Excessive bleeding shall be avoided. Slump requirements will be as specified in Table 3. 030020 Page 7 of 13 Rev.10-30-2014 TABLE 3 Slump Requirements Concrete Desi _gnation Desired Slump Max. SlumpDesired Slump Max. Slump Structural Concrete: (1) Thin-Walled Sections (9" or less) 4 inches 5 inches (2) Slabs, Caps, Columns,Piers, Wall Sections over 9", etc. 3 inches 4 inches Underwater or Seal Concrete 5 inches 6 inches Riprap, Curb, Gutter and Other Miscellaneous Concrete 2.5 inches 4 inches NOTE: No concrete will be permitted with slump in excess of the maximums shown. 8. QUALITY OF CONCRETE General The concrete shall be uniform and workable. The cement content, maximum allowable water- cement ratio, the desired and maximum slump and the strength requirements of the various classes of concrete shall conform to the requirements of Table 3 and Table 4 and as required herein. During the process of the work, the Engineer or his designated representative will cast test cylinders or beams as a check on the compressive or flexural strength of the concrete actually placed. Test cylinders must be picked up by the testing lab within 24 hours. A test shall be defined as the average of the breaking strength of two cylinders or two beams, as the case may be. Specimens will be tested in accordance with TxDOT Test Methods Tex-418-A or Tex-420-A. Test beams or cylinders will be required as specified in the contract documents. For small placements on structures such as manholes, inlets, culverts, wingwalls, etc., the Engineer may vary the number of tests to a minimum of one for each 25 cubic yards placed over a several day period. All test specimens, beams or cylinders, representing tests for removal of forms and/or falsework shall be cured using the same methods, and under the same conditions as the concrete represented. "Design Strength" beams and cylinders shall be cured in accordance with THD Bulletin C-11. The Contractor shall provide and maintain curing facilities as described in THD Bulletin C-11 for the purpose of curing test specimens. Provision shall be made to maintain the water in the curing tank at temperatures between 70°F and 90°F. When control of concrete quality is by twenty-eight-day compressive tests, job control will be by seven-day compressive tests which are shown to provide the required twenty-eight-day strength, based on results from trial batches. If the required seven-day strength is not secured with the 030020 Page 8 of 13 Rev.10-30-2014 cement specified in Table 4, changes in the batch design will be made. TABLE 4 Classes of Concrete Minimum Class Compressive Min. Beam Maximum Coarse of Sacks Cement Strength(f c) Strength Water-Cement Aggregate Concrete per C.Y. (min.) 28-Day(psi) 7-Day(psi) Ratio (gal/sack) No. A* 5.0 3000 500*** 6.5 2-4-8**** B* 4.5 2500 417 8.0 2-4-8**** C* 6.0 3600 600*** 6.0 1-2-4** D 6.0 3000 500 7.0 2-4 S 6.5 4000 570 5.0 2-4 *Entrained Air(slabs,piers and bent concrete). **Grade 1 Coarse Aggregate may be used in foundation only(except cased drilled shafts). ***When Type H Cement is used with Class C Concrete, the 7-day beam break requirement will be 550 psi; with Class A Concrete, the minimum 7-day beam break requirement will be 460 psi. ****Permission to use Grade 8 Aggregate must have prior approval of the Engineer. 9. MIXING CONDITIONS The concrete shall be mixed in quantities required for immediate use. Any concrete which is not in place within the limits outlined in City Standard Specification Section 038000 "Concrete Structures", Article "Placing Concrete-General", shall not be used. Retamping of concrete will not be permitted. In threatening weather, which may result in conditions that will adversely affect the quality of the concrete to be placed, the Engineer may order postponement of the work. Where work has been started and changes in weather conditions require protective measures, the Contractor shall furnish adequate shelter to protect the concrete against damage from rainfall, or from freezing temperatures. If necessary to continue operations during rainfall, the Contractor shall also provide protective coverings for the material stockpiles. Aggregate stockpiles need be covered only to the extent necessary to control the moisture conditions in the aggregates to adequately control the consistency of the concrete. 10. MIXING AND MIXING EQUIPMENT All equipment, tools, and machinery used for hauling materials and performing any part of the work shall be maintained in such condition to insure completion of the work underway without excessive delays for repairs or replacements. The mixing shall be done in a batch mixer of approved type and size that will produce uniform 030020 Page 9 of 13 Rev.10-30-2014 distribution of the material throughout the mass. Mixers may be either the revolving drum type or the revolving blade type, and shall be capable of producing concrete meeting the requirements of these specifications. After all the ingredients are assembled in the drum, the mixing shall continue not less than 1 minute for mixers of one cubic yard or less capacity plus 15 seconds for each additional cubic yard or portion thereof. The mixer shall operate at the speed and capacity designated by the Mixer Manufacturers Bureau of the Associated General Contractors of America. The mixer shall have a plate affixed showing the manufacturer's recommended operating data. The absolute volume of the concrete batch shall not exceed the rated capacity of the mixer. The entire contents of the drum shall be discharged before any materials are placed therein for the succeeding batch. The first batch of concrete materials placed in the mixer for each placement shall contain an extra quantity of sand, cement and water sufficient to coat the inside surface of the drum. Upon the cessation of mixing for any considerable length of time, the mixer shall be thoroughly cleaned. The concrete mixer shall be equipped with an automatic timing device which is put into operation when the skip is raised to its full height and dumping. This device shall lock the discharging mechanism and prevent emptying of the mixer until all the materials have been mixed together for the minimum time required, and it shall ring a bell after the specified time of mixing has elapsed. The water tank shall be arranged so that the amount of water can be measured accurately, and when the tank starts to discharge, the inlet supply shall cut off automatically. Whenever a concrete mixer is not adequate or suitable for the work, it shall be removed from the site upon a written order from the Engineer and a suitable mixer provided by the Contractor. Pick-up and thro-over blades in the drum of the mixer which are worn down more than 10 percent in depth shall be repaired or replaced with new blades. Improperly mixed concrete shall not be placed in the structure. Job mix concrete shall be concrete mixed in an approved batch mixer in accordance with the requirements stated above, adjacent to the structure for which the concrete is being mixed, and moved to the placement site in non-agitating equipment. 11. READY-MIX PLANTS A. General. It shall be the Contractor's responsibility to furnish concrete meeting all requirement of the governing specification sections, and concrete not meeting the slump, workability and consistency requirements of the governing specification sections shall not 030020 Page 10 of 13 Rev.10-30-2014 be placed in the structure or pavement. Ready-Mixed Concrete shall be mixed and delivered by means of one of the following approved methods. (1) Mixed completely in a stationary mixer and transported to the point of delivery in a truck agitator or a truck mixer operating at truck agitator or truck mixer agitation speed. (Central-Mix Concrete) (2) Mixed complete in a truck mixer and transported to the placement site at mixing and/or agitating speed (Transit-Mix Concrete), subject to the following provisions: (a) Truck mixers will be permitted to transport concrete to the job site at mixing speed if equipped with double actuated counters which will separate revolutions at mixing speed from total revolutions. (b) Truck mixers equipped with a single actuated counter counting total revolutions of the drum shall mix the concrete at the plant not less than 50 nor more than 70 revolutions at mixing speed, transport it to the job site at agitating speed and complete the required mixing before placing the concrete. (3) Mixed completely in a stationery mixer and transported to the job site in approved non-agitating trucks with special bodies. This method of transporting will be permitted for concrete pavement only. B. Equipment. (1) Batching Plant. The batching plant shall be provided with adequate bins for batching all aggregates and materials required by the specifications. Bulk cement shall be weighed on a scale separate from those used for other materials and in a hopper entirely free and independent of that used for weighing the aggregates. (2) Mixers and Agitators. _ (a) General: Mixers shall be of an approved stationary or truck-type capable of combining the ingredients into a thoroughly mixed and uniform mass. Facilities shall be provided to permit ready access to the inside of the drum for inspection, cleaning and repair of blades. Mixers and agitators shall be subject to daily examination for changes in condition due to accumulation of hardened concrete and/or wear of blades, and any hardened concrete shall be removed before the mixer will be permitted to be used. Worn blades shall be repaired or replaced with new in 030020 Page 11 of 13 Rev.10-30-2014 accordance with the manufacturer's design and arrangement for that particular unit when any part or section is worn as much as 10 percent below the original height of the manufacturer's design. (b) Stationary Mixers: These shall conform to the requirements of Article "Mixing and Mixing Equipment". Truck mixers mounted on a stationary base will not be considered as a stationary mixer. (c) Truck Mixers: In addition, truck mixers shall comply with the following requirements: An engine in satisfactory working condition and capable of accurately gauging the desired speed of rotation shall be mounted as an integral part of the mixing unit for the purpose of rotating the drum. Truck mixers equipped with a transmission that will govern the speed of the drum within the specified revolutions per minute (rpm)will not require a separate engine. All truck mixers shall be equipped with actuated counters by which the proper number of revolutions of the drum, as specified in Article 11. A. above, may be readily verified. The counters shall be read and recorded at the start of mixing at mixing speeds. Each until shall have adequate water supply and accurate metering or gauging devices for measuring the amount used. (d) Agitators: Concrete agitators shall be of the truck type, capable of maintaining a thoroughly mixed and uniform concrete mass and discharging it within the same degree of uniformity specified for mixers. Agitators shall comply with all of the requirements for truck mixers, except for the actual mixing requirements. C. Operation of Plant and Equipment. Delivery of ready-mixed concrete shall equal or exceed the rate approved by the Engineer for continuous placement. In all cases, the delivery of concrete to the placement site shall assure compliance with the time limits in the applicable specification for depositing successive batches in any monolithic unit. The Contractor shall satisfy the Engineer that adequate standby trucks are available. A standard ticket system will be used for recording concrete batching,mixing and delivery date. Tickets will be delivered to the job inspector. Loads arriving without ticket and/or in unsatisfactory condition shall not be used. When a stationary mixer is used for the entire mixing operation, the mixing time for one cubic yard of concrete shall be one minute plus 15 seconds for each additional cubic yard or portion thereof. This mixing time shall start when all cement, aggregates and initial water have entered the drum. 030020 Page 12 of 13 Rev.10-30-2014 The mixer shall be charged so that some of the mixing water will enter the drum in advance of the cement and aggregate. All of the mixing water shall be in the drum by the end of the first one- fourth of the specified mixing time. Water used to flush down the blades after charging shall be accurately measured and included in the quantity of mixing water. The introduction of the initial mixing water, except blade wash down water and that permitted in this Article, shall be prior to or simultaneous with the charging of the aggregates and cement. The loading of truck mixers shall not exceed 63 percent of the total volume of the drum. When used as an agitator only, the loading shall not exceed 80 percent of the drum volume. When Ready-Mix Concrete is used, additional mortar (one sack cement, three parts sand and sufficient water) shall be added to the batch to coat the drum of the mixer or agitator truck, and this shall be required for every load of Class C concrete only and for the first batch from central mix plants. A portion of the mixing water, required by the batch design to produce the desired slump, may be withheld and added at the job site, but only with permission of the Engineer and under his supervision. When water is added under the above conditions, it shall be thoroughly mixed as specified below for water added at the job site. Mixing speed shall be attained as soon as all ingredients are in the mixer, and each complete batch (containing all the required ingredients) shall be mixed not less than 70 nor more than 100 revolutions of the drum at mixing speed except that when water is added at the job site, 25 revolutions (minimum) at mixing speed will be required to uniformly disperse the additional water throughout the mix. Mixing speed shall be as designated by the manufacturer. All revolutions after the prescribed mixing time shall be at agitating speed. The agitating speed shall be not less than one (1) nor more than five (5) rpm. The drum shall be kept in continuous motion from the time mixing is started until the discharge is completed. 12. PLACING, CURING AND FINISHING The placing of concrete, including construction of forms and falsework, curing and finishing, shall be in accordance with City Standard Specification Section 038000 "Concrete Structures". 13. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, the quantities of concrete of the various classifications which will constitute the completed and accepted structure(s) in-place will be measured by the cubic yard, per each, square foot, square yard or linear foot, as the case may be. Measurement will be as shown on the drawings and/or in the Bid Form. Payment shall be full compensation for furnishing, hauling, mixing, placing, curing and finishing all concrete; all grouting and pointing; furnishing and placing drains; furnishing and placing metal flashing strips; furnishing and placing expansion joint material required by this specification or shown on the plans; and for all forms and falsework, labor, tools, equipment and incidentals necessary to complete the work. 030020 Page 13 of 13 Rev.10-30-2014 SECTION 032020 REINFORCING STEEL 1. DESCRIPTION This specification shall govern the furnishing and placing of reinforcing steel, deformed and smooth, of the size and quantity designated on the plans and in accordance with these specifications. 2. MATERIALS Unless otherwise designated on the plans, all bar reinforcement shall be deformed, and shall conform to ASTM Designation: A 615, Grades 60 or 75, and shall be open hearth, basic oxygen, or electric furnace new billet steel. Large diameter new billet steel(Nos. 14 and 18), Grade 75,will be permitted for straight bars only. Where bending of bar sizes No. 14 or No. 18 of Grade 60 is required, bend testing shall be performed on representative specimens as described for smaller bars in the applicable ASTM Specification. The required bend shall be 90 degrees around a pin having a diameter of 10 times the nominal diameter of the bar. Spiral reinforcement shall be smooth (not deformed) bars or wire of the minimum diameter shown on the plans, and shall be made by one or more of the following processes: open hearth, basic oxygen, or electric furnace. Bars shall be rolled from billets reduced from ingots and shall comply with ASTM Designation: A 306, Grade 65 minimum (references to ASTM Designation: A 29 is voided). Dimensional tolerances shall be in accordance with ASTM Designation: A 615, or ASTM Designation: A 615, Grade 60, except for deformations. Wire shall be cold-drawn from rods that have been hot-rolled from billets and shall comply with ASTM Designation: A 185. In cases where the provisions of this specification are in conflict with the provisions of the ASTM Designation to which reference is made, the provisions of this specification shall govern. Report of chemical analysis showing the percentages of carbon, manganese, phosphorus and sulphur will be required for all reinforcing steel when it is to be welded. 032020 Page 1 of 6 Rev.10-30-2014 The nominal size and area and the theoretical weight of reinforcing steel bars covered by this specification are as follows: Nominal Weight per Bar Size Diameter, Nominal Area, Linear Foot, Number In. Sq. In. Pounds 2 0.250 0.05 0.167 3 0.375 0.11 0.376 4 0.500 0.20 0.668 5 0.625 0.31 1.043 6 0.750 0.44 1.502 7 0.875 0.60 2.044 8 1.000 0.79 2.670 9 1.128 1.00 3.400 10 1.270 1.27 4.303 11 1.410 1.56 5.313 14 1.693 2.25 7.6 18 2.257 4.00 13.60 Smooth round bars shall be designated by size number through No. 4. Smooth bars larger than No. 4 shall be designated by diameter in inches. When wire is ordered by gauge numbers, the following relation between gauge number and diameter, in inches, shall apply unless otherwise specified: Equivalent Equivalent Gauge Diameter, Gauge Diameter, Number Inches Number Inches 0 0.3065 8 0.1620 1 0.2830 9 0.1483 2 0.2625 10 0.1350 3 0.2437 11 0.1205 4 0.2253 12 0.1055 5 0.2070 13 0.0915 6 0.1920 14 0.0800 7 0.1770 032020 Page 2 of 6 Rev.10-30-2014 3. BENDING The reinforcement shall be bent cold, true to the shapes indicated on the plans. Bending shall preferably be done in the shop. Irregularities in bending shall be cause for rejection. Unless otherwise shown on the plans, the inside diameter of bar bends, in terms of the nominal bar diameter(d), shall be as follows: Bends of 90 degrees and greater in stirrups, ties and other secondary bars that enclose another bar in the bend: Grade 60 43, #4, 45 4d 46, 47, 48 5d All bends in main bars and in secondary bars not covered above: Grade 60 Grade 75 43 thru 48 6d 49, 410 8d -- 411 8d 8d 414, 418 10d -- 032020 Page 3of6 Rev.10-30-2014 4. TOLERANCES Fabricating tolerances for bars shall be within 3 percent of specified or as follows: Plan Dimon. a 3/4" T/$" Bar or Smaller--Flan. Dimon. 1`* Bar or Larger --P+an_ D+men. ; F� s 3/ t-!= over 6"--Domen-- zero or li = 5 odd Iris-{}iensn. • Zero or -#/4`i M 7/8- Bar or Smaller--Pian Dimon. = 1/2' _ 1" Bar or Larger-Plan Dimon. * 1• piral or Circular Tie Tie or Stirrup gPIanOirmwWm,]n.*I Plan cm-n-a 1/2 5. STORING Steel reinforcement shall be stored above the surface of the ground upon platforms, skids or other supports, and shall be protected as far as practicable from mechanical injury and surface deterioration caused by exposure to conditions producing rust. When placed in the work, reinforcement shall be free from dirt, paint, grease, oil, or other foreign materials. Reinforcement shall be free from injurious defects such as cracks and laminations. Rust, surface seams, surface irregularities or mill scale will not be cause for rejection,provided the minimum dimensions, cross- sectional area and tensile properties of a hand wire crushed specimen meets the physical requirements for size and grade of steel specified. 6. SPLICES No splicing of bars, except when provided on the plans or specified herein, will be permitted without written approval of the Engineer. Splices will not be permitted in main reinforcement at points of maximum stress. When permitted in main bars, splices in adjacent bars shall be staggered a minimum of two splice lengths. 032020 Page 4 of 6 Rev.10-30-2014 TABLE 1 Minimum Lap Requirements Lap Uncoated Coated Lap in inches > 40d 60d Where: d=bar diameter in inches Welding of reinforcing bars may be used only where shown on the plans or as permitted herein. All welding operations, processes, equipment, materials, workmanship and inspection shall conform to the requirements of the drawings and industry standards. All splices shall be of such dimension and character as to develop the full strength of bar being spliced. End preparation for butt welding reinforcing bars shall be done in the field. Delivered bars shall be of sufficient length to permit this practice. For box culvert extensions with less than one foot of fill, the existing longitudinal bars shall have a 20-diameter lap with the new bars. For box culvert extensions with more than one foot of fill, a minimum of 6 inches lap will be required. Unless otherwise shown on the plans, dowel bars transferring tensile stresses shall have a minimum embedment equal to the minimum lap requirements shown in Table 1. Shear transfer dowels shall have a minimum embedment of 12 inches. 7. PLACING Reinforcement shall be placed as near as possible in the position shown on the plans. Unless otherwise shown on the plans, dimensions shown for reinforcement are to the centers of the bars. In the plane of the steel parallel to the nearest surface of concrete, bars shall not vary from plan placement by more than one-twelfth of the spacing between bars. In the plane of the steel perpendicular to the nearest surface of concrete, bars shall not vary from plan placement by more than one-quarter inch. Cover of concrete to the nearest surface of steel shall meet the above requirements but shall never be less than one inch or as otherwise shown on the plans. Vertical stirrups shall always pass around the main tension members and be attached securely thereto. The reinforcing steel shall be spaced its required distance from the form surface by means of approved galvanized metal spacers, metal spacers with plastic coated tips, stainless steel spacers, plastic spacers, or approved pre-cast mortar or concrete blocks. For approval of plastic spacers on the project, representative samples of the plastic shall show no visible indications of deterioration after immersion in a 5 percent solution of sodium hydroxide for 120 hours. All reinforcing steel shall be tied at all intersections, except that where spacing is less than one foot in each direction, alternate intersections only need be tied. Before any concrete is placed, all mortar shall be cleaned from the reinforcement. Precast mortar or concrete blocks to be used for holding steel in position adjacent to formed surfaces shall be cast in molds meeting the approval of the Engineer and shall be cured by covering with wet burlap or 032020 Page 5of6 Rev.10-30-2014 cotton mats for a period of 72 hours. The blocks shall be cast in the form of a frustum of a cone or pyramid with the smaller face placed against the forms. A suitable tie wire shall be provided in each block, to be used for anchoring to the steel. Except in unusual cases, and when specifically otherwise authorized by the Engineer, the size of the surface to be placed adjacent to the forms shall not exceed two and one-half inches square or the equivalent thereof in cases where circular or rectangular areas are provided. Blocks shall be cast accurately to the thickness required, and the surface to be placed adjacent to the forms shall be a true plane free of surface imperfections. Reinforcement shall be supported and tied in such manner that a sufficiently rigid case of steel is provided. If the cage is not adequately supported to resist settlement or floating upward of the steel, overturning of truss bars or movement in any direction during concrete placement, permission to continue concrete placement will be withheld until corrective measures are taken. Sufficient measurements shall be made during concrete placement to insure compliance with the first paragraph of Article 7 of this specification. Mats of wire fabric shall overlap each other sufficiently to maintain a uniform strength and shall be fastened securely at the ends and edges. No concrete shall be deposited until the Engineer has inspected the placement of the reinforcing steel and given permission to proceed. 8. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, reinforcing steel is considered subsidiary to the various items shown in the Bid Form and shall not be measured and paid for as a separate item. 032020 Page 6of6 Rev.10-30-2014 SECTION 038000 CONCRETE STRUCTURES 1. DESCRIPTION This specification shall govern for construction of all types of structures involving the use of structural concrete, except where the requirements are waived or revised by other governing specifications. All concrete structures shall be constructed in accordance with the design requirements and details shown on the plans; in conformity with the pertinent provisions of the items contracted for; the incidental specifications referred to; and in conformity with the requirements herein. 2. MATERIALS (1) Concrete. All concrete shall conform to the provisions of City Standard Specification Section 030020 "Portland Cement Concrete". The class of concrete for each type of structure or unit shall be as specified on the plans or by pertinent governing specifications. (2) Expansion Joint Material. (a) Preformed Fiber Material. Preformed fiber expansion joint material shall be of the dimensions shown on the plans. The material shall be one of the following types, unless otherwise noted on the plans: 1. Preformed Bituminous Fiber Materials shall meet the requirements of ASTM Designation: D1751 "Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Non-extruding and Resilient Bituminous Types)". 2. Preformed Non-Bituminous Fiber Material shall meet the requirements of ASTM Designation: D1751 "Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Non-extruding and Resilient Bituminous Types)",except that the requirements pertaining to bitumen content, density and water absorption shall be voided. 3. Redwood. (b) Joint Sealing Materials. Unless otherwise shown on the drawings, joint sealing material shall conform to the following requirements. The material shall adhere to the sides of the concrete joint or crack and shall form an effective seal against infiltration of water and incompressibles. The material shall not crack or break when exposed to low temperatures. 038000 Page 1 of 19 Rev.3-25-2015 1. Class 1-a. (Two-Component, Synthetic Polymer,Cold-Extruded Type). Curing is to be by polymerization and not by evaporation of solvent or fluxing of harder particles. This type is specifically designed for vertical or sloping joints and hence not self-leveling. It shall cure sufficiently at an average temperature of 77 degrees F ± 3 degrees F in a maximum of 24 hours. For performance requirements see under 2.(2)(b)2. below. 2. Class 1-b. (Two-Component, Synthetic Polymer, Cold-Pourable, Self-Leveling Type). Curing is to be by polymerization and not by evaporation of solvent or fluxing of harder particles. It shall cure sufficiently at an average temperature of 77 degrees F±3 degrees F in a maximum of 3 hours. Performance Requirements: Class 1-a and Class 1-b joint materials,when tested in accordance with TxDOT Test Method Tex-525-C,shall meet the above curing times and the following requirements: It shall be of such consistency that it can be mixed and poured, or mixed and extruded into joints at temperatures above 60 degrees F. Penetration, 77°F.: 150 gm. cone, 5 sec., max., cm.................. 0.90 Bond and Extension 75%, O°F, 5 cycles: Dry Concrete Blocks............................ Pass Wet Concrete Blocks............................ Pass Steel Blocks...(Primed if specified by manuf). Pass Flow at 200°F................................. None Water Content%by weight, max................. 5.0 Resilience: Original sample min. % (cured)................. 50 Oven aged at 158°F min. % .................... 50 For Class 1-a Material Only: Cold Flow(10 min.)............................ None (c) Asphalt Board. Asphalt Board shall consist of two liners of 0.016-inch asphalt impregnated paper,filled with a mastic mixture of asphalt and vegetable fiber and/or mineral filler. Boards shall be smooth,flat and sufficiently rigid to permit installation. When tested in accordance with TxDOT Test Method Tex-524-C,the asphalt board shall not deflect from the horizontal more than one inch in three and one-half inches (1" in 31/2"). (d) Rebonded Neoprene Filler. Rebonded neoprene filler shall consist of ground closed- cell neoprene particles, rebonded and molded into sheets of uniform thickness, of the dimensions shown on plans. Filler material shall have the following physical properties and shall meet the requirements of ASTM Designation: D 1752"Standard Specification for Preformed Sponge Rubber and Cork Expansion Joint Fillers for Concrete Paving and Structural Construction", Type 1, where applicable: 038000 Page 2 of 19 Rev.3-25-2015 PROPERTY METHOD REQUIREMENT Color ASTM D1752, Type 1 Black Density ASTM D1752, Type 1 40 lb./ft' Min. Recovery ASTM D1752, Type 1 90% Min. Compression ASTM D1752, Type 1 50 to 500 psi Extrusion ASTM D1752, Type 1 0.25 inch Max. Tensile Strength ASTM D1752, Type 1 20 psi Min. Elongation 75% Min. The manufacturers shall furnish the Engineer with certified test results as to compliance with the above requirements and a 12 inch x 12 inch x 1 inch sample from the shipment for approval. (3) Curing Materials. (a) Membrane curing materials shall comply with ASTM Designation: C 309 "Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete",Type 1 clear or translucent, or Type 2 white-pigmented. The material shall have a minimum flash-point of 80 degrees F when tested by the "Pensky-Martin Closed Cup Method". It shall be of such consistency that it can be satisfactorily applied as a fine mist through an atomizing nozzle by means of approved pressure spraying equipment at atmospheric temperatures above 40 degrees F. It shall be of such nature that it will not produce permanent discoloration of concrete surfaces nor react deleteriously with the concrete or its components. Type 1 compound shall contain a fugitive dye that will be distinctly visible not less than 4 hours nor more than 7 days after application. The compound shall produce a firm,continuous,uniform moisture impermeable film free from pinholes and shall adhere satisfactorily to the surfaces of damp concrete. It shall,when applied to the damp concrete surface at the rate of coverage specified herein,be dry to the touch in not more than 4 hours, and shall adhere in a tenacious film without running off or appreciable sagging. It shall not disintegrate, check, peel or crack during the required curing period. The compound shall not peel or pick up under traffic and shall disappear from the surface of the concrete by gradual disintegration. The compound shall be delivered to the job only in the manufacturer's original containers, which shall be clearly labeled with the manufacturer's name, the trade name of the material, and a batch number or symbol with which test samples may be correlated. The water retention test shall be in accordance with TxDOT Test Method Tex-219-F. Percentage loss shall be defined as the water lost after the application of the curing material was applied. The permissible percentage moisture loss (at the rate of coverage specified herein) shall not exceed the 038000 Page 3 of 19 Rev.3-25-2015 following: 24 hours after application............2 percent 72 hours after application............4 percent Type 1 (Resin Base Only)curing compound will be permitted for slab concrete in bridge decks and top slabs of direct traffic culverts. (b) Mat curing of concrete is allowed where permitted by Table 1 in this specification or where otherwise approved by the Engineer. 3. EXPANSION JOINTS Joints and devices to provide for expansion and contraction shall be constructed where and as indicated herein or on the plans. All open j oints and j oints to be filled with expansion j oint material,shall be constructed using forms adaptable to loosening or early removal. To avoid expansion or contraction damage to the adjacent concrete, these forms shall be loosened as soon as possible after final concrete set to permit free movement without requiring full form removal. Prior to placing the sealing material, the vertical facing the joint shall be cleaned of all laitance by sandblasting or by mechanical routing. Cracked or spalled edges shall be repaired. The j oint shall be blown clean of all foreign material and sealed. Where preformed fiber joint material is used,it shall be anchored to the concrete on one side of the joint by light wire or nails, to prevent the material from falling out. The top one inch (1") of the joint shall be filled with joint sealing material. Finished joints shall conform to the indicated outline with the concrete sections completely separated by the specified opening or joint material. Soon after form removal and again where necessary after surface finishing, all projecting concrete shall be removed along exposed edges to secure full effectiveness of the expansion joints. 4. CONSTRUCTION JOINTS The j oint formed by placing plastic concrete in direct contact with concrete that has attained its initial set shall be deemed a construction joint. The term "monolithic placement" shall be interpreted to mean at the manner and sequence of concrete placing shall not create construction joints. Construction joints shall be of the type and at the locations shown on the plans. Additional joints will not be permitted without written authorization from the Engineer, and when authorized, shall have details equivalent to those shown on the plans for joints in similar locations. Unless otherwise provided, construction joints shall be square and normal to the forms. Bulkheads shall be provided in the forms for all joints, except when horizontal. Construction joints requiring the use of joint sealing material shall be as detailed on the plans. The 038000 Page 4 of 19 Rev.3-25-2015 material will be specified on the plans without referenced to joint type. A concrete placement terminating at a horizontal construction joint shall have the top surface roughened thoroughly as soon as practicable after initial set is attained. The surfaces at bulkheads shall be roughened as soon as the forms are removed. The hardened concrete surface shall be thoroughly cleaned of all loose material, laitance, dirt or foreign material, and saturated with water so it is moist when placing fresh concrete against it. Forms shall be drawn tight against the placing of the fresh concrete. 5. FORMS (1) General. Except where otherwise specified, forms may be of either timber or metal. Forms for round columns exposed to view shall be of steel, except that other materials will be allowed with written permission of the Engineer. Forming plans shall be submitted to the Engineer for approval as specified. Forms shall be designed for the pressure exerted by a liquid weighing 150 pounds per cubic foot. The rate of placing the concrete shall be taken into consideration in determining the depth of the equivalent liquid. For j ob fabricated forms,an additional live load of 50 pounds per square foot shall be allowed on horizontal surfaces. The maximum unit stresses shall not exceed 125 percent of the allowable stresses used by the Texas Department of Transportation for the design of structures. Commercially produced structural units used in formwork shall not exceed the manufacturer's maximum allowable working load for moment,shear or end reaction. The maximum working load shall include a live load of 35 pounds per square foot of horizontal form surface, and sufficient details and data shall be submitted for use in checking formwork details for approval. Forms shall be practically mortar-tight,rigidly braced and strong enough to prevent bulging between supports, and maintained to the proper line and grade during concrete placement. Forms shall be maintained in a manner that will prevent warping and shrinkage. Offset at form joints shall not exceed one-sixteenth of an inch(1/16"). Deflections due to cast-in-place slab concrete and railing shown in the dead load deflection diagram shall be taken into account in the setting of slab forms. All forms and footing areas shall be cleaned of any extraneous matter before placing concrete. Permission to place concrete will not be given until all such work is completed to the satisfaction of the Engineer. If, at any stage of the work, the forms show signs of bulging or sagging, the portion of the concrete causing such condition shall be removed immediately,if necessary, and the forms shall be reset and securely braced against further movement. 038000 Page 5 of 19 Rev.3-25-2015 (2) Timber Forms. Lumber for forms shall be properly seasoned, of good quality, and free from imperfections which would affect its strength or impair the finished surface of the concrete. The lumber used for facing or sheathing shall be finished on at least one side and two edges and shall be sized to uniform thickness. Form lining will be required for all formed surfaces, except for the inside of culvert barrels, inlets and manholes; surfaces that are subsequently covered by backfill material or are completely enclosed; and, any surface formed by a single finished board. Lining will not be required when plywood forms are used. Form lining shall be of an approved type such as Masonite or plywood. Thin membrane sheeting, such as polyethylene sheets, shall not be used for form lining. Forms may be constructed of plywood not less than one-half inch in thickness,with no form lining required. The grain of the face plies on plywood forms shall be placed parallel to the span between the supporting studs or joists. Plywood used for forming surfaces that remain exposed shall be equal to that specified as B-B Plyform Class I or Class II Exterior, of the U. S. Department of Commerce, National Bureau of Standards and Technology, latest edition. Forms or form lumber to be reused shall be maintained clean and in good condition. Any lumber which is split, warped, bulged, marred, or has defects that will produce inferior work, shall not be used and, if condemned, shall be promptly removed from the work. Studs and joists shall be spaced so that the facing form material remains in true alignment under the imposed loads. Wales shall be spaced close enough to hold forms securely to the designated lines and scabbed at least 4 feet on each side of joints to provide continuity. A row of wales shall be placed near the bottom of each placement. Facing material shall be placed with parallel and square joints and securely fastened to supporting studs. Forms for surfaces receiving only an ordinary finish and exposed to view shall be placed with the form panels symmetrical,i.e., long dimensions set in the same direction. Horizontal joints shall be continuous. Molding specified for chamfer strips or other uses shall be made of materials of a grade that will not split when nailed and which can be maintained to a true line without warping. Wood molding shall be mill cut and dressed on all faces. Unless otherwise provided, forms shall be filleted at all sharp corners and edges with triangular chamfer strips measuring three-quarter inch (3/4") on the sides. Forms for railing and ornamental work shall be constructed to standards equivalent to first-class millwork. All moldings,panel work and bevel strips shall be straight and true with nearly mitered joints designed so the finished work is true, sharp and clean cut. 038000 Page 6 of 19 Rev.3-25-2015 All forms shall be constructed to permit their removal without marring or damaging the concrete. The forms may be given a slight draft to permit ease of removal. Metal form ties of an approved type or a satisfactory substitute shall be used to hold forms in place and shall be of a type that permits ease of removal of the metal as hereinafter specified. All metal appliances used inside of forms for alignment purposes shall be removed to a depth of at least one-half inch (1/2") from the concrete surface. They shall be made so the metal may be removed without undue chipping or spalling,and when removed,shall leave a smooth opening in the concrete surface. Burning off of rods, bolts or ties will not be permitted. Any wire ties used shall be cut back at least one-half inch (1/2") from the face of the concrete. Devices holding metal ties in place shall be capable of developing the strength of the tie and adjustable to allow for proper alignment. Metal and wooden spreaders which are separate from the forms shall be removed entirely as the concrete is being placed. Adequate clean-out openings shall be proved for narrow walls and other locations where access to the bottom of the forms is not readily attainable. Prior to placing concrete, the facing of all forms shall be treated with oil or other bond breaking coating of such composition that it will not discolor or otherwise injuriously affect the concrete surface. Care shall be exercised to prevent coating of the reinforcing steel. (3) Metal Forms. The foregoing requirements for timber forms regarding design,mortar-tightness, filleted corners,beveled projections,bracing,alignment,removal,reuse and wetting shall also apply to metal forms, except that these will not require lining, unless specifically noted on the plans. The thickness of form metal shall be as required to maintain the true shape without warping or bulging. All bolt and rivet heads on the facing sides shall be countersunk. Clamps, pins or other connecting devices shall be designed to hold the forms rigidly together and to allow removal without injury to the concrete. Metal forms which do not present a smooth surface or line up properly shall not be used. Metal shall be kept free from rust, grease or other foreign materials. 6. PLACING REINFORCEMENT Reinforcement in concrete structures shall be placed carefully and accurately and rigidly supported as provided in the City Standard Specification Section 032020 "Reinforcing Steel". Reinforcing steel supports shall not be welded to I-beams or girders. 7. PLACING CONCRETE-GENERAL The minimum temperature of all concrete at the time of placement shall be not less than 50 degrees F. 038000 Page 7 of 19 Rev.3-25-2015 The consistency of the concrete as placed should allow the completion of all finishing operations without the addition of water to the surface. When conditions are such that additional moisture is needed for finishing,the required water shall be applied to the surface by fog spray only,and shall be held to a minimum amount. Fog spray for this purpose may be applied with hand operated fogging equipment. The maximum time interval between the addition of cement to the batch and the placing of concrete in the forms shall not exceed the following: Air or Concrete Temperature Maximum Time Non-Agitated Concrete: Above 80 degrees F 15 minutes Up to 80 degrees F 30 minutes Agitated Concrete: Above 90 degrees F 45 minutes 75 degrees F to 90 degrees F 60 minutes 35 degrees F to 74 degrees F 90 minutes The use of an approved retarding agent in the concrete will permit the extension of each of the above temperature-time maximums by 30 minutes for direct traffic culverts, and one hour for all other concrete except that the maximum time shall not exceed 30 minutes for non-agitated concrete. Before starting work,the Contractor shall inform the Engineer fully of the construction methods he proposes to use, the adequacy of which shall be subject to the approval of the Engineer. The Contractor shall give the Engineer sufficient advance notice before placing concrete in any unit of the structure to permit the inspection of forms,reinforcing steel placement,and other preparations. Concrete shall not be placed in any unit prior to the completion of formwork and placement of reinforcement therein. Concrete mixing, placing and finishing shall be done during daylight hours, unless adequate provisions are made to light the entire site of all operations. Concrete placement will not be permitted when impending weather conditions will impair the quality of the finished work. If rainfall should occur after placing operations are started,the Contractor shall provide ample covering to protect the work. In case of drop in temperature,the provisions set forth in Article "Placing Concrete in Cold Weather" of this specification shall be applied. The placing of concrete shall be regulated so the pressures caused by the plastic concrete shall not exceed the loads used in form design. 038000 Page 8 of 19 Rev.3-25-2015 The method of handling, placing and consolidation of concrete shall minimize segregation and displacement of the reinforcement, and produce a uniformly dense and compact mass. Concrete shall not have a free fall of more than 5 feet,except in the case of thin walls such as in culverts. Any hardened concrete spatter ahead of the plastic concrete shall be removed. The method and equipment used to transport concrete to the forms shall be capable of maintaining the rate of placement approved by the Engineer. Concrete may be transported by buckets, chutes, buggies, belt conveyors,pumps or other acceptable methods. When belt conveyors or pumps are used, sampling for testing will be done at the discharge end. Concrete transported by conveyors shall be protected from sun and wind,if necessary,to prevent loss of slump and workability. Pipes through which concrete is pumped shall be shaded and/or wrapped with wet burlap, if necessary, to prevent loss of slump and workability. Concrete shall not be transported through aluminum pipes, tubes or other aluminum equipment. Chutes, troughs, conveyors or pipes shall be arranged and used so that the concrete ingredients will not be separated. When steep slopes are necessary, the chutes shall be equipped with baffle boards or made in short lengths that reverse the direction of movement, or the chute ends shall terminate in vertical downspouts. Open troughs and chutes shall extend, if necessary, down inside the forms or through holes left in them. All transporting equipment shall be kept clean and free from hardened concrete coatings. Water used for cleaning shall be discharged clear of the concrete. Each part of the forms shall be filled by depositing concrete as near its final position as possible. The coarse aggregate shall be worked back from the face and the concrete forced under and around the reinforcement bars without displacing them. Depositing large quantities at one point and running or working it along the forms will not be allowed. Concrete shall be deposited in the forms in layers of suitable depth but not more than 36 inches in thickness, unless otherwise directed by the Engineer. The sequence of successive layers or adjacent portions of concrete shall be such that they can be vibrated into a homogenous mass with the previously placed concrete without a cold j oint. Not more than one hour shall elapse between adjacent or successive placements of concrete. Unauthorized construction joints shall be avoided by placing all concrete between the authorized joints in one continuous operation. An approved retarding agent shall be used to control stress cracks and/or unauthorized cold j oints in mass placements where differential settlement and/or setting time may induce stress cracking. Openings in forms shall be provided, if needed, for the removal of laitance of foreign matter of any kind. All forms shall be wetted thoroughly before the concrete is placed therein. All concrete shall be well consolidated and the mortar flushed to the form surfaces by continuous working with immersion type vibrators. Vibrators which operate by attachment to forms or reinforcement will not be permitted, except on steel forms. At least one stand-by vibrator shall be 038000 Page 9 of 19 Rev.3-25-2015 provided for emergency use in addition to those required for placement. The concrete shall be vibrated immediately after deposit. Prior to the beginning of work, a systematic spacing of the points of vibration shall be established to insure complete consolidation and thorough working of the concrete around the reinforcement, embedded fixtures, and into the corners and angles of the forms. Immersion type vibrators shall be inserted vertically,at points 18 to 30 inches apart, and slowly withdrawn. The vibrator may be inserted in a sloping or horizontal position in shallow slabs. The entire depth of each lift shall be vibrated, allowing the vibrator to penetrate several inches into the preceding lift. Concrete along construction joints shall be thoroughly consolidated by operating the vibrator along and close to but not against the j oint surface. The vibration shall continue until thorough consolidation,and complete embedment of reinforcement and fixtures is produced,but not long enough to cause segregation. Vibration may be supplemented by hand spading or rodding,if necessary,to insure the flushing of mortar to the surface of all forms. Slab concrete shall be mixed in a plant located off the structure. Carting or wheeling concrete batches over completed slabs will not be permitted until they have aged at least four(4)full curing days. If carts are used,timber planking will be required for the remainder of the curing period. Carts shall be equipped with pneumatic tires. Curing operations shall not be interrupted for the purpose of wheeling concrete over finished slabs. After concrete has attained its initial set,at least one(1)curing day shall elapse before placing strain on projecting reinforcement to prevent damage to the concrete. The storing of reinforcing or structural steel on completed roadway slabs generally shall be avoided and, when permitted, shall be limited to quantities and distribution that will not induce excessive stresses. 8. PLACING CONCRETE IN COLD WEATHER (1) Cast-in-Place Concrete. Concrete may be placed when the atmospheric temperature is not less than 35 degrees F. Concrete shall not be placed in contact with any material coated with frost or having a temperature less than 32 degrees F. Aggregates shall be free from ice, frost and frozen lumps. When required, in order to produce the minimum specified concrete temperature,the aggregate and/or the water shall be heated uniformly, in accordance with the following: The water temperature shall not exceed 180 degrees F,and/or the aggregate temperature shall not exceed 150 degrees F. The heating apparatus shall heat the mass of aggregate uniformly. The temperature of the mixture of aggregates and water shall be between 50 degrees F and 85 degrees F before introduction of the cement. All concrete shall be effectively protected as follows: (a) The temperature of slab concrete of all unformed surfaces shall be maintained at 50 degrees F or above for a period of 72 hours from time of placement and above 40 degrees F for an additional 72 hours. 038000 Page 10 of 19 Rev.3-25-2015 (b) The temperature at the surface of all concrete in piers, culverts walls,retaining walls,parapets,wingwalls,bottoms of slabs,and other similar formed concrete shall be maintained at 40 degrees F or above for a period of 72 hours from time of placement. (c) The temperature of all concrete, including the bottom slabs of culverts placed on or in the ground, shall be maintained above 32 degrees F for a period of 72 hours from time of placement. Protection shall consist of providing additional covering, insulated forms or other means, and if necessary, supplementing such covering with artificial heating. Curing as specified under Article "Curing Concrete" of this specification shall be provided during this period until all requirements for curing have been satisfied. When impending weather conditions indicate the possibility of the need for such temperature protection, all necessary heating and covering material shall be on hand ready for use before permission is granted to begin placement. Sufficient extra test specimens will be made and cured with the placement to ascertain the condition of the concrete as placed,prior to form removal and acceptance. (2) Precast Concrete. A fabricating plant for precast products which has adequate protection from cold weather in the form of permanent or portable framework and covering, which protects the concrete when placed in the forms,and is equipped with approved steam curing facilities,may place concrete under any low temperature conditions provided: (a) The framework and covering are placed and heat is provided for the concrete and the forms within one hour after the concrete is placed. This shall not be construed to be one hour after the last concrete is placed,but that no concrete shall remain unprotected longer than one hour. (b) Steam heat shall keep the air surrounding the concrete between 50 degrees F and 85 degrees F for a minimum of three hours prior to beginning the temperature rise which is required for steam curing. (c) For fabricating plants without the above facilities and for j ob site precast products,the requirements of the Article "Curing Concrete" of this specification shall apply. The Contractor is responsible for the protection of concrete placed under any and all weather conditions. Permission given by the Engineer for placing concrete during freezing weather will in no way relieve the Contractor of the responsibility for producing concrete equal in quality to that placed under normal conditions. Should concrete placed under such conditions prove unsatisfactory,it shall be removed and replaced at no additional cost. 038000 Page 11 of 19 Rev.3-25-2015 9. PLACING CONCRETE IN WATER Concrete shall be deposited in water only when specified on the plans or with written permission by the Engineer. The forms or cofferdams shall be sufficiently tight to prevent any water current passing through the space in which the concrete is being deposited. Pumping will not be permitted during the concrete placing, nor until it has set for at least 36 hours. The concrete shall be placed with a tremie, closed bottom-dump bucket, or other approved method, and shall not be permitted to fall freely through the water nor shall it be disturbed after it has been placed. The concrete surface shall be kept approximately level during placement. The tremie shall consist of a water-tight tube 14 inches or less in diameter. It shall be constructed so that the bottom can be sealed and opened after it is in place and fully charged with concrete. It shall be supported so that it can be easily moved horizontally to cover all the work area and vertically to control the concrete flow. Bottom-dump buckets used for underwater placing shall have a capacity of not less than one-half cubic yard. It shall be lowered gradually and carefully until it rests upon the concrete already placed and raised very slowly during the upward travel; the intent being to maintain still water at the point of discharge and to avoid agitating the mixture. The placing operations shall be continuous until the work is complete. 10. PLACING CONCRETE IN BOX CULVERTS In general, construction joints will be permitted only where shown on the plans. Where the top slab and walls are placed monolithically in culverts more than 4 feet in clear height, an interval of not less than one (1)nor more than two (2)hours shall elapse before placing the top slab to allow for shrinkage in the wall concrete. The base slab shall be finished accurately at the proper time to provide a smooth uniform surface. Top slabs which carry direct traffic shall be finished as specified for roadway slabs in Article"Finish of Roadway Slabs". Top slabs of fill type culverts shall be given a reasonably smooth float finish. 11. PLACING CONCRETE IN FOUNDATIONS AND SUBSTRUCTURE Concrete shall not be placed in footings until the depth and character of the foundation has been inspected by the Engineer and permission has been given to proceed. Placing of concrete footings upon seal concrete courses will be permitted after the caissons or cofferdams are free from water and the seal concrete course cleaned. Any necessary pumping or bailing during the concreting operation shall be done from a suitable sump located outside the forms. All temporary wales or braces inside cofferdams or caissons shall be constructed or adjusted as the work proceeds to prevent unauthorized construction joints in footings or shafts. 038000 Page 12 of 19 Rev.3-25-2015 When footings can be placed in a dry excavation without the use of cofferdams or caissons, forms may be omitted,if desired by the Contractor and approved by the Engineer,and the entire excavation filled with concrete to the elevation of the top of footing; in which case,measurement for payment will be based on the footing dimensions shown on the plans. 12. TREATMENT AND FINISHING OF HORIZONTAL SURFACES EXCEPT ROADWAY SLABS All unformed upper surfaces shall be struck off to grade and finished. The use of mortar topping for surfaces under this classification will not be permitted. After the concrete has been struck off, the surface shall be floated with a suitable float. Sidewalks shall be given a wood float or broom finish, or may be striped with a brush, as specified by the Engineer. Other surfaces shall be wood float finished and striped with a fine brush leaving a fine- grained texture. 13. FINISH OF ROADWAY SLABS As soon as the concrete has been placed and vibrated in a section of sufficient width to permit working,the surface shall be approximately leveled,struck off and screeded,carrying a slight excess of concrete ahead of the screed to insure filling of all low spots. The screed shall be designed rigid enough to hold true to shape and shall have sufficient adjustments to provide for the required camber. A vibrating screed may be used if heavy enough to prevent undue distortion. The screeds shall be provided with a metal edge. Longitudinal screeds shall be moved across the concrete with a saw-like motion while their ends rest on headers or templates set true to the roadway grade or on the adjacent finished slab. The surface of the concrete shall be screeded a sufficient number of times and at such intervals to produce a uniform surface, true to grade and free of voids. If necessary, the screeded surface shall be worked to smooth finish with a long handled wood or metal float of the proper size, or hand floated from bridges over the slab. When required by the Engineer, the Contractor shall perform sufficient checks with a long handled 10-foot straightedge on the plastic concrete to insure that the final surface will be within the tolerances specified below. The check shall be made with the straightedge parallel to the centerline. Each pass thereof shall lap half of the preceding pass. All high spots shall be removed and all depressions over one-sixteenth inch(1/16")in depth shall be filled with fresh concrete and floated. The checking and floating shall be continued until the surface is true to grade and free of depressions, high spots, voids or rough spots. Rail support holes shall be filled with concrete and finished to match the top of the slab. Surface Texturing. Perform surface texturing using a either carpet drag or metal tieing as indicated on the drawings. Complete final texturing before the concrete has attained its initial set. Draw the carpet drag 038000 Page 13 of 19 Rev.3-25-2015 longitudinally along the pavement surface with the carpet contact surface area adjusted to provide a satisfactory coarsely textured surface. A metal-tine texture finish is required using a tieing machine unless otherwise shown on the plans. Provide the metal-tine finish immediately after the concrete surface has set enough for consistent tieing. Operate the metal-tine device to obtain grooves spaced at 1 in., approximately 3/16 in. deep,with a minimum depth of 1/8 in., and approximately 1/12 in. wide. Do not overlap a previously tined area. Use manual methods for achieving similar results on ramps and other irregular sections of pavements. Repair damage to the edge of the slab and joints immediately after texturing. Do not tine pavement that will be overlaid. Upon completion of the floating and/or straight edging and before the disappearance of the moisture sheen, the surface shall be given a broom or burlap drag finish. The grooves of these finishes shall be parallel to the structure centerline. It is the intent that the average texture depth resulting from the number of tests directed by the Engineer be not less than 0.035 inch with a minimum texture depth of 0.030 inch for anyone test when tested in accordance with TxDOT Test Method Tex-436-A. Should the texture depth fall below that intended, the finishing procedures shall be revised to produce the desired texture. After the concrete has attained its final set, the roadway surface shall be tested with a standard 10- foot straightedge. The straightedge shall be placed parallel to the centerline ofroadway to bridge any depressions and touch high spots. Ordinates of irregularities measured from the face of the straightedge to the surface of the slab shall not exceed one-eighth of an inch(1/8"),making proper allowances for camber,vertical curvature and surface texture. Occasional variations,not exceeding three-sixteenth of an inch (3/16") will be acceptable, if in the opinion of the Engineer it will not affect the riding qualities. When directed by the Engineer, irregularities exceeding the above requirements shall be corrected. In all roadway slab finishing operations,camber for specified vertical curvature and transverse slopes shall be provided. 14. CURING CONCRETE The Contractor shall inform the Engineer fully of the methods and procedures proposed for curing; shall provide the proper equipment and material in adequate amounts; and shall have the proposed methods, equipment and material approved prior to placing concrete. Inadequate curing and/or facilities,therefore,shall be cause for the Engineer to stop all construction on the job until remedial action is taken. All concrete shall be cured for a period of four(4) curing days except as noted herein. 038000 Page 14 of 19 Rev.3-25-2015 EXCEPTIONS TO 4-DAY CURING Description Required Curing Upper Surfaces of Bridge Slabs and 8 curing days (Type I or III) cement Top Slabs of Direct Traffic Culverts 10 curing days (Type II cement) Concrete Piling (non-prestressed) 6 curing days When the air temperature is expected to drop below 35 degrees F,the water curing mats shall be covered with polyethylene sheeting, burlap-polyethylene blankets or other material to provide the protection required by Article "Placing Concrete in Cold Weather" of these specifications. A curing day is defined as a calendar day when the temperature, taken in the shade away from artificial heat, is above 50 degrees F for at least 19 hours (colder days if satisfactory provisions are made to maintain the temperature of all surfaces of the concrete above 40 degrees F for the entire 24 hours). The required curing period shall begin when all concrete therein has attained its initial set. The following methods are permitted for curing concrete subject to the restrictions of Table 1 and the following requirements for each method of curing. (1) Form Curing. When forms are left in contact with the concrete, other curing methods will not be required except for cold weather protection. (2) Water Curing. All exposed surfaces of the concrete shall be kept wet continuously for the required curing time. The water used for curing shall meet the requirements for concrete mixing water as specified in the specification Section 030020 "Portland Cement Concrete". Seawater will not be permitted. Water which stains or leaves an unsightly residue shall not be used. (a) Wet Mat. Cotton mats shall be used for this curing method. They shall be placed as soon as possible after the surface has sufficiently hardened to prevent damage to the concrete. (See Article, "Placing Concrete" of this specification.) Damp burlap blankets made from nine-ounce stock may be placed on the damp concrete surface for temporary protection prior to the application of the cotton mats which may be placed dry and wetted down after placement. The mats shall be weighted down adequately to provide continuous contact with all concrete surfaces where possible. The surfaces of the concrete shall be kept wet for the required curing time. Surfaces which cannot be cured by contact shall be enclosed with mats and anchored positively to the forms or to the ground so that outside air cannot enter the enclosure. Sufficient moisture shall be provided inside the enclosure to keep all surfaces of the concrete wet. (b) Water Spray. This curing method shall consist of overlapping sprays or sprinklers that keep all unformed surfaces continuously wet. (c) Ponding. This curing method requires the covering of the surfaces with a minimum of two inches (2") of clean granular material,kept wet at all times, or a minimum of one-inch 038000 Page 15 of 19 Rev.3-25-2015 (1") depth of water. Satisfactory provisions shall be made to provide a dam to retain the water or saturated granular material. (3) Membrane Curing. This consists of curing concrete pavement,concrete pavement(base),curbs, gutters, retards, sidewalks, driveways, medians, islands, concrete riprap, cement-stabilized riprap, concrete structures and other concrete as indicated on the plans by impervious membrane method. Unless otherwise provided herein or shown on the plans, either Type I-D or Type 2 membrane curing compound may be used where permitted except that Type 1-D (Resin Base Only) will be required for slab concrete in bridge decks and top slabs of direct traffic culverts. TABLE 1 REQUIRED PERMITTED MEMBRANE MEMBRANE STRUCTURE UNIT WATER FOR WATER FOR DESCRIPTION FOR INTERIM FOR INTERIM CURING CURING CURING CURING 1 Top slabs of direct traffic culverts X X 2 Top surface of any concrete unit upon which concrete is to be placed and bonded at a later interval (Stub walls, risers, etc.). X Other superstructure concrete (wing walls, parapet walls, etc.) 3 Concrete pavement (base), curbs, gutters, retards, sidewalks, driveways, medians, X* X* islands, concrete structures, concrete riprap, etc. 4 All substructure concrete, culverts, box sewers, inlets, X* X* manholes, retaining walls *Polyethylene sheeting, burlap-polyethylene mats or laminated mats to prevent outside air from entering will be considered equivalent to water or membrane curing for items 3 and 4. 038000 Page 16 of 19 Rev.3-25-2015 Membrane curing shall not be applied to dry surfaces,but shall be applied just after free moisture has disappeared. Formed surfaces and surfaces which have been given a first rub shall be dampened and shall be moist at the time of application of the membrane. When membrane is used for complete curing, the film shall remain unbroken for the minimum curing period specified. Membrane which is damaged shall be corrected immediately by reapplication of membrane. Unless otherwise noted herein or on the plans,the choice of membrane type shall be at the option of the Contractor. Only one type of curing compound will be permitted on any one structure. The membrane curing compound shall be applied after the surface finishing has been completed,and immediately after the free surface moisture has disappeared. The surface shall be sealed with a single uniform coating of curing compound applied at the rate of coverage recommended by the manufacturer and directed by the Engineer, but not less than 1 gallon per 180 square feet of area. The Contractor shall provide satisfactory means and facilities to properly control and check the rate of application of the compound. The compound shall be thoroughly agitated during its use and shall be applied by means of approved mechanical power pressure sprayers. The sprayers used to apply the membrane to concrete pavement or concrete pavement (base) shall travel at uniform speed along the forms and be mechanically driven. The equipment shall be of such design that it will insure uniform and even application of the membrane material. The sprayers shall be equipped with satisfactory atomizing nozzles. Only on small miscellaneous items will the Contractor be permitted to use hand-powered spray equipment. For all spraying equipment, the Contractor shall provide facilities to prevent the loss of the compound between the nozzle and the concrete surface during the spraying operations. The compounds shall not be applied to a dry surface. If the surface of the concrete has become dry, it shall be moistened prior to application of membrane by fogging or mist application. Sprinkling or coarse spraying will not be allowed. At locations where the coating shows discontinuities,pinholes or other defects,or if rain falls on the newly-coated surface before the film has dried sufficiently to resist damage,an additional coat of the compound shall be applied immediately at the same rate of coverage specified herein. To insure proper coverage, the Engineer shall inspect all treated areas after application of the compound for the period of time designated in the governing specification for curing, either for membrane curing or for other methods. Should the foregoing indicate that any area during the curing period is not protected, an additional coat or coats of the compound shall be applied immediately, and the rate of application of the membrane compound shall be increased until all areas are uniformly covered. When temperatures are such as to warrant protection against freezing,curing by this method shall be supplemented with an approved insulating material capable of protecting the concrete for the specified curing period. If at any time there is reason to believe that this method of curing is unsatisfactory or is detrimental 038000 Page 17 of 19 Rev.3-25-2015 to the work,the Contractor,when notified, shall immediately cease the use of this method and shall change to curing by one of the other methods specified under this contract. 15. REMOVAL OF FORMS Except as herein provided, forms for vertical surfaces may be removed when the concrete has aged not less than one day(24 hours)when Type I and Type II cement is used, and not less than one-half day (12 hours) when Type III cement is used, provided it can be done without damage to the concrete. Forms for inside curb faces may be removed in approximately three hours provided it can be done without damage to the curb. 16. FINISHING EXPOSED SURFACES Concrete shall be finished as required in the specification Section for the respective item or as otherwise specified on the plans. An ordinary surface finish shall be applied to all concrete surfaces either as a final finish or preparatory to a higher finish. Ordinary Surface Finish shall be as follows: After form removal,all porous or honey-combed areas and spalled areas shall be corrected by chipping away all loose or broken material to sound concrete. Feather edges shall be eliminated by cutting a face perpendicular to the surface. Shallow cavities shall be repaired using adhesive grout or epoxy grout. If judged repairable by the Engineer, large defective areas shall be corrected using concrete or other material approved by the Engineer. Holes and spalls caused by removal of metal ties, etc., shall be cleaned and filled with adhesive grout or epoxy grout. Exposed parts of metal chairs on surfaces to be finished by rubbing, shall be chipped out to a depth of one-half inch (1/2") and the surface repaired. All fins,runs, drips or mortar shall be removed from surfaces which remain exposed. Form marks and chamfer edges shall be smoothed by grinding and/or dry rubbing. Grease, oil, dirt, curing compound, etc., shall be removed from surfaces requiring a higher grade of finish. Discolorations resulting from spillage or splashing of asphalt,paint or other similar material shall be removed. Repairs shall be dense,well bonded and properly cured, and when made on surfaces which remain exposed and do not require a higher finish, shall be finished to blend with the surrounding concrete. 038000 Page 18 of 19 Rev.3-25-2015 17. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form,no direct measurement or payment will be made for the work to be done or the equipment to be furnished under this specification,but it shall be considered subsidiary to the particular items required by the plans and the contract documents. 038000 Page 19 of 19 Rev.3-25-2015 SECTION 055420 FRAMES, GRATES, RINGS AND COVERS 1. DESCRIPTION This specification shall govern for the furnishing and installation of frames, grates,rings and covers for inlets, manholes and other structures in accordance with those details. Steel shall conform to the requirements of ASTM Designation: A36 "Standard Specification for Carbon Structural Steel". 2. MATERIALS Welded steel grates and frames shall conform to the member size, dimensions and details shown on the plans and shall be welded into an assembly in accordance with those details. Steel shall conform to the requirements of ASTM Designation: A36. Castings, whether Carbon-Steel, Gray Cast Iron or Ductile Iron, shall conform to the shape and dimensions shown on the plans and shall be clean substantial castings, free from burnt-on sand or blow holes, and shall be reasonable smooth. Runners, risers, fins, and other cast-on pieces shall be removed from the castings and such areas ground smooth. Bearing surfaces between manhole rings and covers or grates and frames shall be cast or machined with such precision that uniform bearing shall be provided throughout the perimeter contact area. Pairs of machined castings shall be matchmarked to facilitate subsequent identification at installation. Steel castings shall conform to the requirements of ASTM Designation: A27 "Standard Specification for Steel Castings, Carbon, for General Application". Grade 70-36 shall be furnished unless otherwise specified. Cast Iron castings shall conform to the requirements of ASTM Designation: A48 "Standard Specification for Gray Iron Castings", Class 30. Ductile iron castings shall conform to the requirements of ASTM Designation: A536 "Standard Specification for Ductile Iron Castings". Grade 60-40-18 shall be used otherwise specified. 3. CONSTRUCTION METHODS Frames, grates, rings and covers shall be constructed of the materials as specified and in accordance with the details shown on the plans, and shall be placed carefully to the lines and grades indicated on the plans or as directed by the Engineer. All welding shall conform to the requirements of the latest American Welding Society Specifications. Frames, grates, rings and covers shall be given one coat of a commercial grade red lead and oil paint and two coats of commercial grade aluminum paint. 055420 Page 1 of 2 Rev.3-25-2015 Painting on gray iron castings will not be required, except when used in conjunction with structural steel shapes. Commercial grade galvanized bolts and nuts shall be used. The zinc coating shall be uniform in thickness, smooth and continuous. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, frames, grates, rings and covers will not be measured for payment,but shall be considered subsidiary to other bid items. 055420 Page 2 of 2 Rev.3-25-2015 APPENDIX GEOTECHNICAL REPORT GEOTECHWAL, ENGNEERNG 0 COMTRUCTION MAIERIALS ENGMEERING &TESTMG Sm,s - ASPHALT - CONCRETE January 30, 2017 City of Corpus Christi Engineering Services PO Box 9277 Corpus Christi, Texas 78469-9277 Attention- Mr. J.H. Edmonds, Director of Engineering Services SUBJECT- SUBSURFACE EXPLORATION, LABORATORY TESTING PROGRAM, AND PAVEMENT RECOMMENDATIONS FOR THE PROPOSED RALSTON AVENUE IMPROVEMENTS City of Corpus Christi Project No. E16271 Ralston Avenue (Staples Street to Alameda Street) Corpus Christi, Texas RETL Job No. — G116595 Dear Mr. Edmonds, In accordance with our agreement, we have conducted a subsurface investigation, laboratory testing program, and pavement evaluation for the above referenced project. The results of this investigation, together with our recommendations, are to be found in the accompanying report, one electronic copy of which is being transmitted herewith for your records and distribution to the design team. Often, because of design and construction details that occur on a project, questions arise concerning soil conditions, and Rock Engineering and Testing Laboratory, Inc. (RETL), Texas Professional Engineering Firm No. — 2101, would be pleased to continue its role as Geotechnical Engineer during the project implementation. RETL also has great interest in providing materials testing and observation services during the construction phase of this project. If you will advise us of the appropriate time to discuss these engineering services, we will be pleased to meet with you at your convenience. If you have any questions, or if we can be of further assistance, please contact us at (361) 883-4555. Sincerely, Mark C. Rock, P.E. Vice President of Operations ROCK ENoINEERM & TESTiw LABORATORY, INC., www„rocktestiing.com 6817 LEOPARD STREET-CORPt,GS CHMSTN,TexAs 78409-1703 10856VANDAL E ST,SM AwomoJEXAS78216-3625 OMC (361)8,83-4555FAQ, (361)883-4711 OFFCE:(210)495-8000 FAX: (21 0)495-8015 No.1 ROUNDVILLE LANE - ROUND RocK,TExAs 78664 OFRCE�(512)284-8022 - FAX:(512)284-7764 SUBSURFACE EXPLORATION, LABORATORY TESTING PROGRAM, AND PAVEMENT RECOMMENDATIONS FOR THE PROPOSED RALSTON AVENUE IMPROVEMENTS CITY OF CORPUS CHRISTI PROJECT NO. E16271 RALSTON AVENUE (STAPLES STREET TO ALAMEDA STREET) CORPUS CHRISTI, TEXAS RETL REPORT NUMBER: G116595 PREPARED FOR CITY OF CORPUS CHRISTI ENGINEERING SERVICES PO BOX 9277 CORPUS CHRISTI, TEXAS 78469-9277 JANUARY 30, 2017 PREPARED BY: ROCK ENGINEERING AND TESTING LABORATORY, INC. 6817 LEOPARD STREET CORPUS CHRISTI, TEXAS 78409 PHONE: (361) 883-4555; FAX: (361) 883-4711 OF TEXAS PROFESSIONAL ENGINEERING FIRM NO. 2101ti f 1 AN 71131"),15 �� Brian J. Geiger, P.E. Mark C. Rock, P.E. Geotechnical Engineer Vice President of Operations Cell: 906 370 5196 Cell: 361 438 8755 TABLE OF CONTENTS Page INTRODUCTION.................................................................................................................1 Authorization .........................................................................................................1 Purposeand Scope................................................................................................1 General .................................................................................................................1 FIELD EXPLORATION .......................................................................................................2 Scope.....................................................................................................................2 Drilling and Sampling Procedures...........................................................................3 Field Tests and Measurements ..............................................................................3 LABORATORY TESTING PROGRAM................................................................................4 SUBSURFACE CONDITIONS.............................................................................................4 General .................................................................................................................4 SoilConditions........................................................................................................5 Groundwater Observations.....................................................................................7 PAVEMENT RECOMMENDATIONS...................................................................................7 Routine Maintenance of Rigid and Flexible Pavement Systems ...........................11 Roadway Construction and Design Considerations..............................................11 Earthwork and Foundation Acceptance................................................................12 GENERAL COMMENTS ...................................................................................................12 APPENDIX Boring Location Plan Boring Logs B-1 through B-10 Key to Soil Classifications and Symbols January 30, 2017 RALSTON AVENUE (E16271) City of Corpus Christi Staples St. to Alameda St.; Corpus Christi, Texas Attn: Mr. J. H. Edmonds, P.E. RETL Job No.: G116595 INTRODUCTION This report presents the results of a soils exploration for the proposed Ralston Avenue Improvements (City of Corpus Christi Project No. E16271) located on Ralston Avenue between Staples Street and Alameda Street in Corpus Christi, Texas. This study was conducted for the City of Corpus Christi. Authorization The work for this project was performed in accordance with Rock Engineering and Testing Laboratory, Inc. (RETL) proposal number P101116A dated October 24, 2016. The scope of work and fee was approved and incorporated into a City of Corpus Christi's Agreement for "Geotechnical Testing and Engineering Services" executed by the City of Corpus Christi and returned to RETL via email transmission with a cover letter dated December 22, 2016. Purpose and Scope The purpose of this exploration was to evaluate the roadway, soil, and groundwater conditions and to provide flexible and rigid pavement sections suitable for a 30-year pavement design. The Geotechnical Engineer states that the findings, recommendations, specifications or professional advice contained herein have been presented after being prepared in a manner consistent with that level of care and skill ordinarily exercised by reputable members of the Geotechnical Engineer's profession practicing contemporaneously under similar conditions in the locality of the project. No other representations are expressed or implied, and no warranty or guarantee is included or intended. The scope of services did not include an environmental assessment. Any statements in this report, or on the boring logs, regarding odors, colors, unusual or suspicious items or conditions are strictly for the information of the client. General The exploration and analysis of the subsurface conditions reported herein are considered sufficient in detail and scope for providing pavement recommendations for the subject project. The information submitted for the proposed project is based on project details provided by City of Corpus Christi and the soil information obtained at the sample locations. If the designers require additional soil parameters to complete the design of the proposed pavement systems and this information can be obtained from the soil data and laboratory tests performed within the scope of work included in our proposal for this project, RETL will provide the additional information requested as a supplement to this report. 1of12 January 30, 2017 RALSTON AVENUE (E16271) City of Corpus Christi Staples St. to Alameda St.; Corpus Christi, Texas Attn: Mr. J. H. Edmonds, P.E. RETL Job No.: G116595 The Geotechnical Engineer warrants that the findings, recommendations, specifications, or professional advice contained herein, have been presented after being prepared in accordance with generally accepted professional engineering practice in the fields of foundation engineering, soil mechanics and engineering geology. No warranties are implied or expressed. This report has been prepared for the exclusive use of the City of Corpus Christi for the specific application to the proposed Ralston Avenue Improvements (City of Corpus Christi Project No. E16271) located on Ralston Avenue between Staples Street and Alameda Street in Corpus Christi, Texas. FIELD EXPLORATION Scope The field exploration, to evaluate the engineering characteristics of the subsurface materials, included performing the soil borings and determining strength and classification of the subgrade soils samples obtained. The summary of boring, boring depth, location, thickness of pavement constituents encountered are provided in the table below: SUMMARY OF BORINGS RALSTON AVENUE; S. Staples St.to S.Alameda St. Boring/Core Boring Location Depth of Depth of Number Depth (ft) HMAC (in) Base(in) B-1 CoreN 27.760070 W 97.401400 2.75" 5.5" 40' E. of Staples St., EBL, 5'from EOP B-2 5' N 27.760390 W 97.400930 2.5" 7.5" 230' E. of Staples St., WBL, 5'/'from EOP B-3 CoreN 27.760900 W 97.40021° 2.75" 7.25" 260' W. of Swantner Dr., EBL, 6'from EOP B-4 5' N 27.761250 W 97.399790 4" 5.25" 50'W. of Swantner Dr., WBL, 5'from EOP B-5 5' N 27.761530 W 97.399220 2.5" 10" 75' E. of Swantner Dr., EBL, 5'from EOP B-6 CoreN 27.761950 W 97.398490 5" 2.75" 390' E. of Swantner Dr., EBL, 6'/'from EOP B-7 5' N 27.762320 W 97.397720 5.5" 7" 400'W. of Reid Dr., EBL, 5'from EOP B-8 CoreN 27.762770 W 97.396940 3.75" 7.75" 100'W. of Reid Dr., WBL, 5'/'from EOP B-9 CoreN 27.763220 W 97.396100 4.5" 3.5" 150' E. of Reid Dr., WBL, 7'/'from EOP B-105' N 27.763640 W 97.395220 5.5" 6.5" 130'W. of S. Alameda St., EBL, 4'from EOP Average Thickness of Existing Pavement Constituents (in) 3.9" 6.3" 2of12 January 30, 2017 RALSTON AVENUE (E16271) City of Corpus Christi Staples St. to Alameda St.; Corpus Christi, Texas Attn: Mr. J. H. Edmonds, P.E. RETL Job No.: G116595 Where: EBL = East Bound Lane WBL = West Bound Lane EOP = Edge of Pavement The borings performed for this project were used to determine the classification and strengths of the in-situ soils and thickness of existing pavement constituents. The information obtained on the boring logs includes boring location, boring depth, thickness of pavement constituents, soil classification, soil strengths, laboratory test results and GPS coordinates obtained using a commercially available GPS at the boring locations. The boring logs are included in the Appendix. Drilling and Sampling Procedures At each boring location, pavement cores were performed to provide access to the subsurface soils. The pavement cores were obtained using a coring machine equipped with a diamond bit to penetrate the existing pavement constituents to a depth at which the subgrade soils were encountered. Once the pavement constituents were penetrated and the existing pavement constituents removed, a drilling rig equipped with a rotary head turning solid stem augers was used to advance the boreholes to the desired boring termination depth. Disturbed soil samples were obtained employing split-barrel sampling procedures in general accordance with the procedures for, "Penetration Test and Split-Barrel Sampling of Soils, (ASTM D1586)." Undisturbed soil samples were obtained using thin- wall tube sampling procedures in accordance with, "Thin Walled Tube Sampling of Soils, (ASTM D1587)." The samples obtained by this procedure were extruded by a hydraulic ram and classified in the field. The samples were placed in plastic bags, marked according to boring number, depth and any other pertinent field data, stored in special containers and delivered to the laboratory for testing. Field Tests and Measurements Penetration Tests — During the sampling procedures, standard penetration tests (SPT) were performed to obtain the standard penetration value of the soil at selected intervals. The standard penetration value (N) is defined as the number of blows of a 140-pound hammer, falling 30-inches, required to advance the split-barrel sampler 1- foot into the soil. The sampler is lowered to the bottom of the previously cleaned drill hole and advanced by blows from the hammer. The number of blows is recorded for each of three successive 6-inch penetrations. The "N" value is obtained by adding the second and third 6-inch increment number of blows. The results of standard penetration tests indicate the relative density of cohesionless soils and comparative consistency of cohesive soils, thereby providing a basis for estimating the relative strength and compressibility of the soil profile components. 3of12 January 30, 2017 RALSTON AVENUE (E16271) City of Corpus Christi Staples St. to Alameda St.; Corpus Christi, Texas Attn: Mr. J. H. Edmonds, P.E. RETL Job No.: G116595 Water Level Observations - Water level observations were obtained during the test boring operations and are noted on the boring logs provided in the Appendix. In relatively pervious soils, such as sandy soils, the indicated depths are usually reliable groundwater levels. In relatively impervious soils, a suitable estimate of the groundwater depth may not be possible, even after several days of observation. Seasonal variations, temperature, land-use, proximity to a creek, river or lake and recent rainfall conditions may influence the depth to the groundwater. The amount of water in open boreholes largely depends on the permeability of the soils encountered at the boring locations. Ground Surface Elevations - The ground surface elevations at the boring locations were not provided. Therefore, the depths referred to in this report are from the actual ground surface elevations at the boring locations during the time of our field investigation. LABORATORY TESTING PROGRAM In addition to the field investigation, a laboratory testing program was conducted to determine additional pertinent engineering characteristics of the subsurface materials necessary in analyzing the behavior of the pavement systems for the proposed project. The laboratory testing program included supplementary visual classification (ASTM D2487) and water content tests (ASTM D2216) on the samples. In addition, selected samples were subjected to Atterberg limits tests (ASTM D4318) and percent material finer than the #200 sieve tests (ASTM D1140). The estimated soil strengths were obtained using a hand penetrometer. The laboratory testing program was conducted in general accordance with applicable ASTM Specifications. The results of these tests are to be found on the accompanying boring logs provided in the Appendix. SUBSURFACE CONDITIONS General The types of soils encountered in the test borings have been visually classified and are described in detail on the boring logs. The results of the strength tests, water level observations and other laboratory tests are presented on the boring logs in numerical form. Representative samples of the soils were placed in polyethylene bags and are now stored in the laboratory for further analysis, if desired. Unless notified to the contrary, the samples will be disposed of 3-months after issuance of this report. The stratification of the soil, as shown on the boring logs, represents the soil conditions at the actual boring locations. Variations may occur between, or beyond, the actual boring locations. Lines of demarcation represent the approximate boundary between different soil types, but the transition may be gradual, or not clearly defined. 4of12 January 30, 2017 RALSTON AVENUE (E16271) City of Corpus Christi Staples St. to Alameda St.; Corpus Christi, Texas Attn: Mr. J. H. Edmonds, P.E. RETL Job No.: G116595 It should be noted that, whereas the test borings were drilled and sampled by experienced drillers, it is sometimes difficult to record changes in stratification within narrow limits. In the absence of foreign substances, it is also difficult to distinguish between discolored soils and clean soil fill. Soil Conditions The generalized soil conditions encountered have been summarized and soil properties including soil classification, strength, angle of internal friction and effective unit weight are provided in the following tables: Soil Profile Table; Borings B-2 D Description LL PI I C 7, 0-0.8 Ex. HMAC Pavement Not Applicable 0.8-5 Silty SAND NP NP 0 28 110 Soil Profile Table; Boring B-7 D Description LL PI I C Ye 0-1.0 Ex. HMAC Pavement Not Applicable 1.0-3 Silty SAND NP NP 0 28 110 3-5 Fat CLAY --- --- 350 0 115 Soil Profile Table; Boring B-4, B-5 and B-10 D Description LL PI I C I 7e 0-1.0 Ex. HMAC Pavement Not Applicable 1.0-2 Fat CLAY and CLAYEY 41-86 20-62 3,300 0 120 Sand 2-5 Fat CLAY 86-93 61-66 2,500 0 120 It should be noted that, based on experience in the vicinity of this project it is RETL's opinion that the Silty Sand soils encountered at this project location are fill soils and not the natural in-situ soils. Where: D = Depth in feet below existing grade LL = Liquid limit(%) PI = Plasticity index C = Soil Cohesion, psf(undrained) �=Angle of Internal Friction, deg. (undrained) ye= Effective soil unit weight, pcf 5of12 January 30, 2017 RALSTON AVENUE (E16271) City of Corpus Christi Staples St. to Alameda St.; Corpus Christi, Texas Attn: Mr. J. H. Edmonds, P.E. RETL Job No.: G116595 Three base samples were subjected to Atterberg limits tests to determine the plasticity index of the existing base materials. Three composite samples of the base material were manufactured. One sample was made up of the base material obtained from borings B-1 through B-4, the second sample from borings B-5 through B-8 and the third sample from borings B-9 and B-10. The results are as follows: Composite Plasticity Index (PI) Borings B-1 and B-4 Liquid limit (LL) — 38 Plastic Limit (PL) — 20 Plasticity Index (PI) — 18* Composite Plasticity Index (PI) Borings B-5 and B-8 Liquid limit (LL) — 31 Plastic Limit (PL) — 15 Plasticity Index (PI) — 16 Composite Plasticity Index (PI) Borings B-9 through B-10 Liquid limit (LL) — 35 Plastic Limit (PL) — 15 Plasticity Index (PI) — 20* *The plasticity index (PI) of the composite base materials sampled do not meet the requirements for the City of Corpus Christi S-24 Base Material maximum allowed plasticity index for raw base material of 16 max. Considering the base material obtained from approximately two-thirds of the project length does not meet the old City of Corpus Christi base material specification for S-24 Base Material the roadway may be considered for in-situ cement stabilization provided that: • The upper 4-inches of pavement is removed (ie: 3.9" of HMAC and 0.1" of base material). • After the upper 4-inches of pavement is removed, the exposed base material shall be proof rolled in accordance with 2014 TxDOT Item 216. Any soft areas encountered shall be removed to lateral limits extending at least 2-feet outside the identified soft area and down to firm soils. Subgrade materials that are removed shall be replaced with 2014 TxDOT Item 247, Type A or D, Grade 1-2. The material used for subgrade replacement shall be compacted to a minimum density of 98% of the maximum dry unit weight of the material as determined by a standard Proctor test (ASTM D698) and at, or above, the optimum moisture content. • After proof rolling and replacement operations are complete, add a sufficient amount of new base material (2014 TxDOT Item Type A or D, Grade 1-2) to replace the removed 2-inches of the removed existing roadway constituents. 6of12 January 30, 2017 RALSTON AVENUE (E16271) City of Corpus Christi Staples St. to Alameda St.; Corpus Christi, Texas Attn: Mr. J. H. Edmonds, P.E. RETL Job No.: G116595 • Cement Stabilize with a minimum of 4-percent cement. (Actual amount of cement required to achieve a minimum compressive strength of 300 psi shall be determined prior to actual cement stabilization operations in the field) • Compact cement stabilized mixture to a minimum density of 98-percent of the maximum dry unit weight of the material as determined by a standard Proctor test (ASTM D698) and within 3-percent of the optimum moisture content. • Place a minimum of 2-inches of properly placed Type D HMAC. Groundwater Observations Groundwater was not observed at the boring locations during drilling operations and was not observed in the boreholes upon completion of the drilling operations. Therefore, based on the observations made in the field during the drilling operations it is RETL's opinion that the groundwater at this site is at depths greater than 5-feet, the deepest boring termination depth. It should be emphasized that water levels in open boreholes may require several hours to several days to stabilize depending on the permeability of the soils and that groundwater levels at this site will be subject to seasonal conditions, recent rainfall, drought or temperature effects. PAVEMENT RECOMMENDATIONS The proposed roadway rehabilitation may include modifications, improvements and possible full roadway rehabilitation. The roadway is expected to follow the same horizontal alignment. The vertical alignment may warrant some minor changes to improve drainage. The capacity of the roadway and roadway classification will remain the same. In designing the proposed roadway, the existing subgrade conditions must be considered together with the expected traffic use and loading conditions. The conditions that influence pavement design can be summarized as follows: • Bearing values of the subgrade. These can be represented by a California Bearing Ratio (CBR) for the design of flexible pavements, or a Modulus of Subgrade Reaction (K) for rigid pavements. • Vehicular traffic, in terms of the number and frequency of vehicles and their range of axle loads. • Probable increase in vehicular use over the life of the pavement. • The availability of suitable materials to be used in the construction of the pavement and their relative costs. 7of12 January 30, 2017 RALSTON AVENUE (E16271) City of Corpus Christi Staples St. to Alameda St.; Corpus Christi, Texas Attn: Mr. J. H. Edmonds, P.E. RETL Job No.: G116595 Specific laboratory testing to define the subgrade strength (i.e. CBR/K values) have not been performed for this analysis. Based upon local experience and soil classification, the estimated CBR and K values for the predominate in-situ fat clay soils encountered at this site are, 3 and 75 pci, respectively. Full reconstruction to current city standards will require the following flexible and rigid pavement sections: Recommended Pavement Sections— Ralston Avenue (S. Staples St. to S. Alameda St.) Pavement Constituent Flex. Pvmt. Flex. Pvmt. Rigid Pvmt. Rigid Pvmt. No. 1 No. 2 No. 1 No. 2 Rigid Concrete Pavement N/A N/A 6" 6" HMAC Type D 2" 2" --- --- HMAC Type B --- --- 4" --- Limestone (Type A Gr. 1) 6" 6" --- --- Tensar BX 1100 --- Yes --- --- Lime Stabilized Subgrade (7'/%) 8" --- --- 8" Compacted Subgrade Yes Yes Yes Yes After all surface organics, deleterious materials and existing roadway materials have been removed to the desired subgrade elevation, the upper 12-inches of exposed raw subgrade shall be compacted to a minimum density of 98-percent of the maximum dry density as determined by the standard Proctor test (ASTM D698) and at, or above, the optimum moisture content. Any soft areas identified shall be removed and properly recompacted in place. Where specified in the table above, a single layer of TENSAR BX1100 geogrid placed in accordance with the manufacturer's recommendations on top of 12-inches of raw subgrade compacted to a minimum density of 98-percent of the maximum dry unit weight of the raw subgrade soils as determined by a standard Proctor test (ASTM D698) and at, or above, the optimum moisture content shall be placed in accordance with the manufacturer's recommendations. Where specified in the tables above, lime placement and mixing operations should be performed in accordance with 2014 TxDOT Item 260, "LIME TREATMENT FOR MATERIALS USED AS SUBGRADE (ROAD MIXED)." Lime shall be mixed with the natural in-situ soils at a rate of 7'/2-percent based on the maximum dry unit weight of the raw subgrade soils as determined by the standard Proctor test (ASTM D698). After proper curing time, usually 48 to 72 hours, the lime stabilized soils should be remixed and compacted to a minimum density of 98-percent of the maximum dry unit weight of the lime stabilized subgrade soils as determined by a standard Proctor test (ASTM D698) and at, or above, the optimum moisture content. 8of12 January 30, 2017 RALSTON AVENUE (E16271) City of Corpus Christi Staples St. to Alameda St.; Corpus Christi, Texas Attn: Mr. J. H. Edmonds, P.E. RETL Job No.: G116595 The flexible base materials utilized shall meet the minimum physical requirements for 2014 TxDOT Item 247, Type A, Grade 1-2. Base materials in flexible pavement areas should be placed in maximum 8-inch thick loose lifts and compacted to a minimum density of 98-percent of the maximum dry density as determined by the modified Proctor test (ASTM D1557) and within 1'/2-percent of the optimum moisture content. RETL recommends placing a single course seal coat or a prime coat (MC-30 or AE-P) on the finished base material prior to placing the HMAC surface courses. A single course surface treatment shall be applied after the base material has been primed. Hot mix asphaltic concrete should meet the requirements set forth in 2014 TxDOT Item 340; Type D and Type B surface and base courses, respectively. Minimum and maximum thickness of HMAC placement for the types of HMAC recommended are provided in the following table- Minimum/Maximum Recommended HMAC Compacted Lift Thickness HMAC Mixture Type Minimum Compacted Maximum Compacted Lift Lift Thickness Thickness Type B HMAC 2.5" 5" Type D HMAC 1.5" 3" The use of concrete for paving has become more prevalent in recent years due to a decrease in the material cost of concrete and to the long term maintenance cost benefits of concrete pavement compared to asphaltic pavements. The concrete pavement should be properly reinforced and jointed, as per ACI, and should have a mean concrete modulus of rupture of 620 psi (4,000 psi compressive strength concrete). Appropriate design details shall be applied when using jointed plain concrete pavement (JPCP) or roller compacted concrete pavement (RCC). Expansion joints should be sealed with an appropriate sealant so that moisture infiltration into the subgrade soils and resultant concrete deterioration at the joints is minimized. The joints should be thoroughly cleaned and sealant should be installed without overfilling before the pavement is opened to traffic. As previously stated, in-situ cement stabilization of the existing pavement constituents between the limits of S. Staples St. to S. Alameda St. may be considered for in-situ cement stabilization. All cement stabilization shall be performed in accordance with 2014 TxDOT Specification; Item 275; Cement Treatment (Road Mixed) with a minimum of 4-percent cement based on the maximum dry unit weight of the raw salvaged pavement as determined by the standard Proctor test (ASTM D698) and then compacted in place to a minimum density of 98-percent of the standard Proctor test (ASTM D698) and within 3-percent of the optimum moisture content. Given the plasticity index of the existing base materials encountered on Ralston Avenue between S. Staples St. to S. Alameda St. RETL recommends that cement stabilization be performed in accordance with the general sequence of construction- 9 of 12 onstruction:9of12 January 30, 2017 RALSTON AVENUE (E16271) City of Corpus Christi Staples St. to Alameda St.; Corpus Christi, Texas Attn: Mr. J. H. Edmonds, P.E. RETL Job No.: G116595 • The upper 4-inches of pavement is removed and discarded (ie: 3.9" of HMAC and 0.1" of base material). • After the upper 4-inches of pavement is removed, the exposed base material shall be proof rolled in accordance with 2014 TxDOT Item 216. Any soft areas encountered shall be removed to lateral limits extending at least 2-feet outside the identified soft area and down to firm soils. Subgrade materials that are removed shall be replaced with 2014 TxDOT Item 247, Type A or D, Grade 1-2. The material used for subgrade replacement shall be compacted to a minimum density of 98% of the maximum dry unit weight of the material as determined by a standard Proctor test (ASTM D698) and at, or above, the optimum moisture content. • After proof rolling and replacement operations are complete, add a minimum of 2-inches of new base material (2014 TxDOT Item Type A or D, Grade 1-2) in order to achieve blue top base elevation. • Cement Stabilize the upper 6-inches of existing and new base material with a minimum of 4-percent cement. (The estimated amount of cement required to achieve a minimum compressive strength of 300 psi from field mixed laboratory compacted and cured compressive strength specimen shall be determined prior to actual cement stabilization operations in the field.) • Compact cement stabilized mixture to a minimum density of 98-percent of the maximum dry unit weight of the material as determined by a standard Proctor test (ASTM D698) and within 3-percent of the optimum moisture content. • Place a minimum of 2-inches of properly placed Type D HMAC. It should be noted that the cement stabilized roadway does not meet the latest City of Corpus Christi minimum requirements for new residential streets, but it is RETL's opinion that if the construction operations are performed in accordance with plans and specifications then the cement stabilized roadway will meet or exceed the City of Corpus Christi requirements when the roadway was originally constructed. Any other pay items not specifically referenced shall be either City of Corpus Christi specifications or TxDOT specifications. All TxDOT specifications are referenced from the 2014 Texas Department of Transportation, "STANDARD SPECIFICATIONS FOR CONSTRUCTION OF HIGHWAYS, STREETS AND BRIDGES." Allowances for proper drainage and proper material selection of base materials are most important for performance of asphaltic pavements. Ruts and areas that hold water in asphalt pavements allow for quick deterioration of the pavement primarily due to saturation of the underlying base and subgrade. 10 of 12 January 30, 2017 RALSTON AVENUE (E16271) City of Corpus Christi Staples St. to Alameda St.; Corpus Christi, Texas Attn: Mr. J. H. Edmonds, P.E. RETL Job No.: G116595 Routine Maintenance of Rigid and Flexible Pavement Systems The pavement sections provided in this report are designed to provide adequate serviceability over the design life of the pavement. During the design life, the roadway will require routine maintenance such as crack sealing and seal coats for flexible pavements and joint maintenance for rigid pavement sections. Without proper maintenance moisture infiltration into the base material and subgrade will result in rapid deterioration of the pavement system. RETL recommends that the City of Corpus Christi protect their investment by incorporating an aggressive maintenance program. Roadway Construction and Design Considerations Roadways will be subject to movements when constructed over moderate to highly plastic soils. Changes in moisture content of the supporting moderate to highly plastic soils causes volumetric changes resulting in differential movements. Provisions in the site development and design should be made in order to maintain relatively uniform moisture contents of the supporting soils. A number of measures may be used to attain a reduction in subsoil moisture content variations, thus reducing the soil's shrink/swell volume change potential. Some of these measures are outlined below: • During construction, a positive drainage scheme should be implemented to prevent ponding of water on the subgrade. • We recommend that an effective site drainage plan be devised by others prior to commencement of construction to provide positive drainage away from the site improvements and off the site, both during, and after construction. • The top 2-feet of utility trenches should be backfilled with low plasticity clays to assure the trenches do not serve as aqueducts that could transport water beneath the pavement due to excessive surface water infiltration. • Vegetation placed in landscape beds that are adjacent to the pavement should be limited to plants and shrubs that will not exceed a mature height of 3-feet. Large bushes and trees should be planted away from the pavement and flatwork at a distance that will exceed their full mature height and canopy width. • Individual concrete panels of concrete sitework should be dowelled together to minimize trip hazards as a result of differential movements within the flatwork. • Pavements should be designed to drain quickly with a minimum positive slope of 1 percent. Behind the curb and gutter it is recommended to incorporate a properly compacted clay cap at the surface to prevent moisture from entering the pavement base materials. 11 of 12 January 30, 2017 RALSTON AVENUE (E16271) City of Corpus Christi Staples St. to Alameda St.; Corpus Christi, Texas Attn: Mr. J. H. Edmonds, P.E. RETL Job No.: G116595 All project features beyond the scope of those discussed above should be planned and designed similarly to attain a region of relatively uniform moisture content within the pavement areas. Poor drainage schemes are generally the primary cause of foundation and flatwork problems on clay soils. Earthwork and Foundation Acceptance Exposure to the environment may weaken the soils if excavations remain open for long periods of time. Therefore, it is recommended that all excavations be extended to final grade and the utilities, boxes, and manholes be installed as soon as possible to minimize potential damage to the bearing soils. The bearing level should be free of loose soil, ponded water or debris and should be observed by the Geotechnical Engineer, or his designated representative. Concrete, pavement constituents, bedding materials and backfill materials should not be placed on soils that have been disturbed by rainfall or seepage. If the bearing soils are softened by surface water intrusion, or by desiccation, the unsuitable soils must be removed from the excavation and replaced with properly compacted fill. Backfill materials should be placed in maximum 8-inch thick loose lifts and compacted to a minimum density of 95-percent of the maximum dry density as determined by the standard Proctor test (ASTM D698) and the moisture content should be maintained within —1 to +3-percent of the optimum moisture content. The Geotechnical Engineer or his designated representative should monitor the placement of roadway constituents, bedding material, backfill and backfill behind the curb. Any areas not meeting the required compaction should be recompacted and retested until compliance is met. GENERAL COMMENTS If there are any revisions to the plans for the proposed project, or if deviations from the subsurface conditions noted in this report are encountered during construction, RETL should be retained to determine if changes in the recommendations are required. If RETL is not retained to perform these functions, RETL will not be responsible for the impact of those conditions on the performance of the project. It is recommended that RETL be retained to provide observation and testing during the construction of the proposed project. RETL cannot accept any responsibility for any conditions which deviate from those described in this report, nor for the performance of the project if not engaged to also provide construction observation and testing. If it is required for RETL to accept any liability, then RETL must agree with the plans and perform such observation during construction as we recommend. All sheeting, shoring, and bracing of trenches, pits and excavations should be made the responsibility of the contractor and should comply with all current and applicable local, state and federal safety codes, regulations and practices, including the Occupational Safety and Health Administration. 12 of 12 APPENDIX GsC7r4.lEWSMV ENGeNrE N ENONEEMNG &TESTMG So .s - ASPHALT '* CONCRETE BORING LOCATION PLAN „ I . I7 W y u x u I r u, it kq n i a January 30, 2017 RALSTON AVENUE (E16271) City of Corpus Christi Staples St. to Alameda St.; Corpus Christi, Texas Attn: Mr. J. H. Edmonds, P.E. RETL Job No.: G116595 ROCKENGINEEMG & TEsnNG LABORATORY, INC. wwwrocktesting,com 6617 LEOPARD STREET.COAPUS CHRU Tt,TEXAs 78409-1703 10356` ANDALE ST"SM4 vcmao.°t"EXAs 762`16.3625 OMM(361)683-4555- FAX: (36'1)363-4711 0MCE(210)495-800 - FW (210)495-60115 No,I ROUNDOLLE LME - Rowc wr TEXAS 76664 OFFICE(612)264.8022 a Ax:(512)284-7764 LOG OF BORING B-'I SHEET 1 of 1 G CLIENT: City of Corpus Christi Rock Engineering&Testing Laboratory PROJECT: Ralston Avenue Improvements q, 6817 Leopard Street Corpus Christi,TX 78409-1703 LOCATION: Ralston Ave.: S. Staples St. to S. Alameda St. </O ' gp•O Telephone: 361-883-4555 NUMBER: G116595 (City Job No. E16271) 9gTo�� `�Go�Qo Fax: 361-883-4711 DATE(S) DRILLED: 1/10/17- 1/10/17 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Electric Core Rig o LIMITS z x w GROUNDWATER INFORMATION: W O z p > Groundwater was not encountered during coring operations. WW H H z Ljj J HFOU} O �_ J I- } LL j p O Z) -W W W J U J (� (� � (� LL N M �- g LL z U)U)��� � z w t- O O } � J 3:66 > > Q Q W D K W z a � 2 m o o a a ED z z SURFACE ELEVATION: N/A ° o U) cQn z a a° LL PL PI o 0- OU U) ° DESCRIPTION OF STRATUM C ORE ASPHALT, approximately 2%-inches. BASE MATERIAL, approximately 5'h-inches. 15 1 0 M h ui W U O a rn z z O of N - STANDARD PENETRATION TEST RESISTANCE REMARKS: m P - POCKET PENETROMETER RESISTANCE Core location was determined by RETL.Coring operations were performed by RETL at p GPS Coordinates N 27.76007°W 97.40140°. c� T- POCKET TORVANE SHEAR STRENGTH Core Location:40'E.of S.Staples St.,EBL,5'from EOP. 01 1 EBL-East Bound Lane;EOP-Edge of Pavement LOG OF BORING B-2 SHEET 1 of 1 G CLIENT: City of Corpus Christi Rock Engineering&Testing Laboratory PROJECT: Ralston Avenue Improvements q, 6817 Leopard Street Corpus Christi,TX 78409-1703 LOCATION: Ralston Ave.: S. Staples St. to S. Alameda St. </0 ' gp•O Telephone: 361-883-4555 NUMBER: G116595 (City Job No. E16271) 9gTo�A `�Go�Qo Fax: 361-883-4711 DATE(S) DRILLED: 1/9/17 - 1/9/17 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Electric Core Rig/Solid Stem Auger o LIMITS z x w GROUNDWATER INFORMATION: O Z p > Groundwater was not encourntered during drilling operations. w >o z F- ? &5 Dry and Open upon completion. F OU} O �_ J I— } LL > p O Z) -W W W J U J (� (� � (� LL N 0] �- g LL Z U)���� U) U z � w t- O O } J n nzC) > > Q Q W D 0 Z a m o o a a z z SURFACE ELEVATION: N/A ° o U) cQn z a a° 2 LL PL PI o 0- °° U) ° DESCRIPTION OF STRATUM F E A PHALT, approximately 2'h-inches. BASE MATERIAL, approximately 7'h-inches. B 8 1 SILTY SAND, dry, brown. SH 5 S-1 2 3 Same as above. (SM) 4 SH 4 NP NP NP 18 S-2 U : W.'.. O 5 Boring was terminated at a depth of 5-feet. 5 z Z Z of N - STANDARD PENETRATION TEST RESISTANCE REMARKS: m P - POCKET PENETROMETER RESISTANCE Boring depth and location were determined by RETL.Drilling operations were performed p by RETL at GPS Coordinates N 27.76039°W 97.40093°. T- POCKET TORVANE SHEAR STRENGTH Boring Location:230'E.of S.Staples St.,WBL,5'/z from EOP. 01 1 WBL-West Bound Lane;EOP-Edge of Pavement;NP-Non Plastic LOG OF BORING B-3 SHEET 1 of 1 G CLIENT: City of Corpus Christi Rock Engineering&Testing Laboratory PROJECT: Ralston Avenue Improvements q, 6817 Leopard Street Corpus Christi,TX 78409-1703 LOCATION: Ralston Ave.: S. Staples St. to S. Alameda St. </O ' gp•O Telephone: 361-883-4555 NUMBER: G116595 (City Job No. E16271) 9gTo�� `�Go�Qo Fax: 361-883-4711 DATE(S) DRILLED: 1/10/17- 1/10/17 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Electric Core Rig o LIMITS z x w GROUNDWATER INFORMATION: W O z p > Groundwater was not encountered during coring operations. WW H H z Ljj J HFOU} O �_ J I- } LL j p O Z) -W W W J U J (� (� � (� LL N M �- g LL z U)U)��� � z w t- O O } � J 3:66 > > Q Q W D K W z a � 2 m o o a a ED z z SURFACE ELEVATION: N/A ° o U) cQn z a a° LL PL PI o 0- OU U) ° DESCRIPTION OF STRATUM C ORE ASPHALT, approximately 2%-inches. BASE MATERIAL, approximately 7'/-inches. 13 1 0 M h ui W U O a rn z z O of N - STANDARD PENETRATION TEST RESISTANCE REMARKS: m P - POCKET PENETROMETER RESISTANCE Core location was determined by RETL.Coring operations were performed by RETL at p GPS Coordinates N 27.76090°W 97.40021'. c� T- POCKET TORVANE SHEAR STRENGTH Core Location:260'W.of Swantner Dr.,EBL,6'from EOP. oI EBL-East Bound Lane;EOP-Edge of Pavement LOG OF BORING B-4 SHEET 1 of 1 G CLIENT: City of Corpus Christi Rock Engineering&Testing Laboratory PROJECT: Ralston Avenue Improvements q, 6817 Leopard Street Corpus Christi,TX 78409-1703 LOCATION: Ralston Ave.: S. Staples St. to S. Alameda St. </O ' gp•O Telephone: 361-883-4555 NUMBER: G116595 (City Job No. E16271) 9gTo�A `�Go�Qo Fax: 361-883-4711 DATE(S) DRILLED: 1/9/17 - 1/9/17 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Electric Core Rig/Solid Stem Auger o LIMITS z x w GROUNDWATER INFORMATION: O Z p > Groundwater was not encourntered during drilling operations. w >o z F- ? &5 Dry and Open upon completion. F OU} O �_ J I- } LL > p O Z) -W W W J U J (� (� � (� LL N 0] �- g LL Z U)���� U) U z � w t- O O } J n n z C) > > Q Q W D O Z a m o o a a z z SURFACE ELEVATION: N/A ° o U) cQn z a a° 2 LL PL PI o a° ° c~n ° DESCRIPTION OF STRATUM ASPHALT, approximately 4-inches. ORE BASE MATERIAL, approximately 5'/-inches. GRAB 11 1 FAT CLAY, dry, dark brown,firm. (CH) S S-11 N=8 23 86 24 62 86 2 3 Same as above,very stiff. 0 4 M SH S-2 P=4.5+ 24 � J W YI U O a O S Boring was terminated at a depth of 5-feet. 5 Z z of N - STANDARD PENETRATION TEST RESISTANCE REMARKS: m P - POCKET PENETROMETER RESISTANCE Boring depth and location were determined by RETL.Drilling operations were performed p by RETL at GPS Coordinates N 27.76125°W 97.39979°. c� T- POCKET TORVANE SHEAR STRENGTH Boring Location:50'W.of Swantner Dr.,WBL,5'from EOP. o WBL-West Bound Lane;EOP-Edge of Pavement LOG OF BORING B-5 SHEET 1 of 1 G CLIENT: City of Corpus Christi Rock Engineering&Testing Laboratory PROJECT: Ralston Avenue Improvements q, 6817 Leopard Street Corpus Christi,TX 78409-1703 LOCATION: Ralston Ave.: S. Staples St. to S. Alameda St. </O ' gp•O Telephone: 361-883-4555 NUMBER: G116595 (City Job No. E16271) 9gTo�A `�Go�Qo Fax: 361-883-4711 DATE(S) DRILLED: 1/9/17 - 1/9/17 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Electric Core Rig/Solid Stem Auger o LIMITS z x w GROUNDWATER INFORMATION: O Z 0 > Groundwater was not encourntered during drilling operations. w >o z F- ? &5 Dry and Open upon completion. F OU} O �_ J I- } LL > p 0 Z) H LL LL W J () J (� (� � (� LL N 0] �- g LL Z U)���� U) U z � w t- O O } J n n z C) > > Q Q W D Z a m o o a a z z SURFACE ELEVATION: N/A ° o U) cQn z a a° 2 LL PL PI 0 0- °U U) ° DESCRIPTION OF STRATUM CORE ASPHALT, approximately 2'h-inches. • BASE MATERIAL, approximately 10-inches. • GRAB 15 • • 1 FAT CLAY, moist, dark brown, very stiff. SH S-11 P=4.5+ 25 2 3 Same as above. (CH) 0 4 M SH S-2 p=4.0 25 86 25 61 92 � J W YI U O a O S Boring was terminated at a depth of 5-feet. 5 Z z of N - STANDARD PENETRATION TEST RESISTANCE REMARKS: m P - POCKET PENETROMETER RESISTANCE Boring depth and location were determined by RETL.Drilling operations were performed p by RETL at GPS Coordinates N 27.76153°W 97.39922°. T- POCKET TORVANE SHEAR STRENGTH Boring Location:75'E.of Swantner Dr.,EBL,5'from EOP. o EBL-East Bound Lane;EOP-Edge of Pavement LOG OF BORING B-6 SHEET 1 of 1 G CLIENT: City of Corpus Christi Rock Engineering&Testing Laboratory PROJECT: Ralston Avenue Improvements q, 6817 Leopard Street Corpus Christi,TX 78409-1703 LOCATION: Ralston Ave.: S. Staples St. to S. Alameda St. </O ' gp•O Telephone: 361-883-4555 NUMBER: G116595 (City Job No. E16271) 9gTo�� `�Go�Qo Fax: 361-883-4711 DATE(S) DRILLED: 1/10/17- 1/10/17 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Electric Core Rig o LIMITS z x w GROUNDWATER INFORMATION: W O z p > Groundwater was not encountered during coring operations. WW H H z Ljj J HFOU} O �_ J I- } LL j p O Z) -W W W J U J (� (� � (� LL N M �- g LL z U)U)��� � z w t- O O } � J 3:66 > > Q Q W D K W z a � 2 m o o a a ED z z SURFACE ELEVATION: N/A ° o U) cQn z a a° 2 LL PL PI o 0- OU U) ° DESCRIPTION OF STRATUM ASPHALT, approximately 5-inches. r. GORAB! E 16BASE MATERIAL, approximately 2%-inches. 1 0 M h ui W U O a rn z z O of N - STANDARD PENETRATION TEST RESISTANCE REMARKS: m P - POCKET PENETROMETER RESISTANCE Core location was determined by RETL.Coring operations were performed by RETL at p GPS Coordinates N 27.76195°W 97.39849°. T- POCKET TORVANE SHEAR STRENGTH Core Location:390'E.of Swantner Dr.,WBL,6'/z from EOP. o WBL-West Bound Lane;EOP-Edge of Pavement LOG OF BORING B-7 SHEET 1 of 1 G CLIENT: City of Corpus Christi Rock Engineering&Testing Laboratory PROJECT: Ralston Avenue Improvements q, 6817 Leopard Street Corpus Christi,TX 78409-1703 LOCATION: Ralston Ave.: S. Staples St. to S. Alameda St. </O ' gp•O Telephone: 361-883-4555 NUMBER: G116595 (City Job No. E16271) 9gTo�A `�Go�Qo Fax: 361-883-4711 DATE(S) DRILLED: 1/10/17- 1/10/17 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Electric Core Rig/Solid Stem Auger o LIMITS z x w GROUNDWATER INFORMATION: O Z p > Groundwater was not encourntered during drilling operations. w >o z F- ? &5 Dry and Open upon completion. OU} O �_ J I— } LL > p O Z) -W W W J U J (� (� � (� LL N M �- g LL Z U)U)U)�D W 0 � Z w t- O O } � J �cncnzC) > > Q Q W D 0 O W Z a m o o(If a a z z SURFACE ELEVATION: N/A ° o U) U) z a a° 2 LL PL PI o a° OU U) ° DESCRIPTION OF STRATUM ASPHALT, approximately 5'h-inches. ORE BASE MATERIAL, approximately 7-inches. GRAB 12 � 1 SILTY SAND, moist, brown, loose. SS N=7 11 NP NP NP 24 S-1 2 3 FAT CLAY, moist, brown, soft. 0 4 M SS S-2 N=3 37 � J W YI U O a O S Boring was terminated at a depth of 5-feet. 5 z Z Z of N - STANDARD PENETRATION TEST RESISTANCE REMARKS: m P - POCKET PENETROMETER RESISTANCE Boring depth and location were determined by RETL.Drilling operations were performed p by RETL at GPS Coordinates N 27.76232°W 97.39772°. T- POCKET TORVANE SHEAR STRENGTH Boring Location:400'W.of Reid Dr.,EBL,5'from EOP. o EBL-East Bound Lane;EOP-Edge of Pavement;NP-Non Plastic LOG OF BORING B-8 SHEET 1 of 1 G CLIENT: City of Corpus Christi Rock Engineering&Testing Laboratory PROJECT: Ralston Avenue Improvements q, 6817 Leopard Street Corpus Christi,TX 78409-1703 LOCATION: Ralston Ave.: S. Staples St. to S. Alameda St. </O ' gp•O Telephone: 361-883-4555 NUMBER: G116595 (City Job No. E16271) 9gTo�� `�Go�Qo Fax: 361-883-4711 DATE(S) DRILLED: 1/10/17- 1/10/17 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Electric Core Rig o LIMITS z x w GROUNDWATER INFORMATION: W O z p > Groundwater was not encountered during coring operations. WW H H z Ljj J HFOU} O �_ J I- } LL j p O Z) -W W W J U J (� (� � (� LL N M �- g LL z U)U)��� � z w t- O O } � J 3:66 > > Q Q W D W z a � 2 m o o a a ED z z SURFACE ELEVATION: N/A ° o U) cQn z a a° 2 LL PL PI o 0- UU U) ° DESCRIPTION OF STRATUM ASPHALT, approximately 3%-inches. 1 ORE -. BASE MATERIAL, approximately 7%-inches. GRAB 13 • 1 0 M h ui W U O a rn z z O of N - STANDARD PENETRATION TEST RESISTANCE REMARKS: m P - POCKET PENETROMETER RESISTANCE Core location was determined by RETL.Coring operations were performed by RETL at p GPS Coordinates N 27.76277°W 97.39694°. c� T- POCKET TORVANE SHEAR STRENGTH Core Location:100'W.of Reid Dr.,WBL,5'/z'from EOP. o WBL-West Bound Lane;EOP-Edge of Pavement LOG OF BORING B-9 SHEET 1 of 1 G CLIENT: City of Corpus Christi Rock Engineering&Testing Laboratory PROJECT: Ralston Avenue Improvements q, 6817 Leopard Street Corpus Christi,TX 78409-1703 LOCATION: Ralston Ave.: S. Staples St. to S. Alameda St. </O ' gp•O Telephone: 361-883-4555 NUMBER: G116595 (City Job No. E16271) 9gTo�� `�Go�Qo Fax: 361-883-4711 DATE(S) DRILLED: 1/10/17- 1/10/17 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Electric Core Rig o LIMITS z x w GROUNDWATER INFORMATION: W O z p > Groundwater was not encountered during coring operations. WW H H z Ljj J HFOU} O �_ J I- } LL j p O Z) -W W W J U J (� (� � (� LL N M �- g LL z U)U)��� � z w t- O O } � J 3:66 > > Q Q W D K W z a � 2 m o o a a ED z z SURFACE ELEVATION: N/A ° o U) cQn z a a° 2 LL PL PI o 0- UU U) ° DESCRIPTION OF STRATUM ASPHALT, approximately 4'h-inches. ORB 17 E BASE MATERIAL, approximately 3'h-inches. • GRA 1 0 M h ui W U O a rn z z O of N - STANDARD PENETRATION TEST RESISTANCE REMARKS: m P - POCKET PENETROMETER RESISTANCE Core location was determined by RETL.Coring operations were performed by RETL at p GPS Coordinates N 27.76322°W 97.39610°. c� T- POCKET TORVANE SHEAR STRENGTH Core Location:150'E.of Reid Dr.,WBL,7%'from EOP. o WBL-West Bound Lane;EOP-Edge of Pavement LOG OF BORING B-10 SHEET 1 of 1 G CLIENT: City of Corpus Christi Rock Engineering&Testing Laboratory PROJECT: Ralston Avenue Improvements q, 6817 Leopard Street Corpus Christi,TX 78409-1703 LOCATION: Ralston Ave.: S. Staples St. to S. Alameda St. </O ' gp•O Telephone: 361-883-4555 NUMBER: G116595 (City Job No. E16271) 9gTo�A `�Go�Qo Fax: 361-883-4711 DATE(S) DRILLED: 1/10/17- 1/10/17 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Electric Core Rig/Solid Stem Auger o LIMITS z x w GROUNDWATER INFORMATION: O Z p > Groundwater was not encourntered during drilling operations. w >o z F- ? &5 Dry and Open upon completion. OU} O �_ J I— } LL > p O Z) -W W W J U J (� (� � (� LL N M �- g LL Z U)U)U)�D W 0 � Z w t- O O } � J �cncnzC) > > Q Q W D 0 O W Z a m o o(If a a z z SURFACE ELEVATION: N/A ° o U) U) z a a° 2 LL PL PI o a° OU U) ° DESCRIPTION OF STRATUM ASPHALT, approximately 5'h-inches. ORE BASE MATERIAL, approximately 6'h-inches. GRAB 17 • 1 POSSIBLE FILL: CLAYEY SAND, dry, brown, very stiff. (SC) SH S-11 p=4.25 14 41 21 20 24 2 FAT CLAY, moist, brown, very stiff. (CH) SH S-2 p=4.0 30 93 27 66 66 3 Same as above. 0 4 M SH S-3 P=20 34 � J W YI U O a O S Boring was terminated at a depth of 5-feet. 5 z Z Z of N - STANDARD PENETRATION TEST RESISTANCE REMARKS: m P - POCKET PENETROMETER RESISTANCE Boring depth and location were determined by RETL.Drilling operations were performed p by RETL at GPS Coordinates N 27.76364°W 97.39522°. T- POCKET TORVANE SHEAR STRENGTH Boring Location:130'W.of S.Alameda St.,EBL,4'from EOP. o EBL-East Bound Lane;EOP-Edge of Pavement Rock Engineering&Testing Laboratory FS 6817 Leopard Street Corpus Christi,TX 78409-1703 c Engineering&Testing Telephone: 361-883-4555 t1 0 �arc9r P�o Laboratory, Inc. Fax: 361-883-4711 � KEY TO SOIL CLASSIFICATION AND SYMBOLS UNIFIED SOIL CLASSIFICATION SYSTEM TERMS CHARACTERIZING SOIL MAJOR DIVISIONS SYMBOL NAME STRUCTURE GW ,'. Well Graded Gravels or Gravel-Sand mixtures, SLICKENSIDED-having inclined planes of little or no fines weakness that are slick and glossy in appearance GRAVEL GP ° Poorly Graded Gravels or Gravel-Sand mixtures, AND o 0 little or no fines FISSURED-containing shrinkage cracks, GRAVELLY frequently filled with fine sand or silt;usually SOILS GM ° Silty Gravels,Gravel-Sand-Silt mixtures more or less vertical o LAMINATED(VARVED)-composed of thin layers of varying color and texture,usually grading from COARSE GC Clayey Gravels,Gravel-Sand-Clay Mixtures sand or silt at the bottom to clay at the top GRAINED CRUMBLY-cohesive soils which break into small SOILS SW Well Graded Sands or Gravelly Sands,little or no blocks or crumbs on drying fines Poorly Graded Sands or Gravelly Sands,little or CALCAREOUS-containing appreciable quantities of calcium carbonate,generally nodular SAND SP no fines AND SANDY WELL GRADED-having wide range in grain sizes SOILS SM Silty Sands,Sand-Silt Mixtures and substantial amounts of all intermediate particle sizes SC Clayey Sands,Sand-Clay mixtures POORLY GRADED-predominantly of one grain size uniformly graded)or having a range of sizes with some intermediate size missing(gap or skip ML Inorganic Silts and very fine Sands, Rock Flour, graded) Silty or Clayey fine Sands or Clayey Silts SILTS Inorganic Clays of low to medium plasticity, SYMBOLS FOR TEST DATA AND CLAYS CL Gravelly Clays,Sandy Clays,Silty Clays, Lean LL<50 Clays_ _V — GroundwaterLevel Organic Silts and Organic Silt-Clays of low - (Initial Reading) FINE OL plasticity GRAINED 1 — Groundwater Level SOILS JH Inorganic Silts,Micaceous or Diatomaceous fine - (Final Reading) SILTS Sandy or Silty soils, Elastic Silts ' — Shelby Tube Sample AND CLAYS Inorganic Clays of high plasticity, Fat Clays LL>50 ® — SPT Samples Organic Clays of medium to high plasticity, Organic Silts m — Auger Sample 011 01, HIGHLY ORGANIC SOILS PT „ Peat and other Highly Organic soils — Rock Core TERMS DESCRIBING CONSISTENCY OF SOIL COARSE GRAINED SOILS FINE GRAINED SOILS DESCRIPTIVE NO. BLOWS/FT. DESCRIPTIVE NO. BLOWS/FT. UNCONFINED TERM STANDARD PEN. TERM STANDARD PEN. COMPRESSION TEST TEST TONS PER SQ. FT. Very Loose 0-4 Very Soft <2 <0.25 Loose 4- 10 Soft 2-4 0.25-0.50 Medium 10-30 Firm 4-8 0.50- 1.00 Dense 30-50 Stiff 8- 15 1.00-2.00 Very Dense over 50 Very Stiff 15-30 2.00-4.00 Hard over 30 over 4.00 Field Classification for"Consistency"is determined with a 0.25'diameter penetrometer GEol'ECHNKAL ENGRIEERIW5 0 CONSTIRUCMN MATEWALS ENGINEERIIN,G &TIESTNG Sms - ASPHALT - CONCRETE April 21, 2017 City of Corpus Christi Engineering Services PO Box 9277 Corpus Christi, Texas 78469-9277 Attention- Mr. J.H. Edmonds, Director of Engineering Services SUBJECT- SUPPLEMENT NO. 1 SUBSURFACE EXPLORATION, LABORATORY TESTING PROGRAM, AND PAVEMENT RECOMMENDATIONS FOR THE PROPOSED RALSTON AVENUE IMPROVEMENTS City of Corpus Christi Project No. E16271 Ralston Avenue (Staples Street to Alameda Street) Corpus Christi, Texas RETL Job No. — G116595 Dear Mr. Edmonds, In accordance with a request from the project design professional, Urban Engineering, RETL is providing this Supplement No. 1 to the original report for this project dated January 30, 2017. The recommendations included herein supersede any conflicting recommendations provided in the original report. One electronic copy of this Supplement No. 1 is being transmitted herewith for your records and distribution to the design team. Clean salvaged recycled flexible pavement (RAP), scarified and mixed to produce a mixture meeting the City of Corpus Christi Specification Section 025202 SCARIFYING AND RESHAPING BASE COURSE may be utilized as City of Corpus Christi Specification Section 022080 EMBANKMENT to the grades as shown on the plans and extending a minimum of 6-inches outside the limits of the proposed sidewalk. City of Corpus Christi Specification Section 022040 STREET EXCAVATION limits shall extend a minimum of 1- foot outside the limits of the sidewalk and the exposed subgrade soils shall be compacted to a minimum of 95-percent of the maximum dry density of the raw subgrade soils as determined by the standard Proctor test (ASTM D698) and at optimum moisture content, to plus 3-percent. The embankment material shall be compacted to a minimum density of 95- percent of the maximum dry density of the raw subgrade soils as determined by the standard Proctor test (ASTM D698) and at, or above, the optimum moisture content. Rocx ENGPNeE:Rwc & 'TEsTmG LABORMORY,IINC. WWW.rDC*1eStjng,C0M 6817 LEOPARD STREET-COAPtl$CHFOSTu.TiEus 78,409-1703 10866 VANDA u-S7,Sm ANTC,WC TEXAS 782716-3625, Of F)cf,(361) 883-4555- F,Ax: (361)883-47'11 OfFci,:(21 0)495-,8000- Foa,'� (21 0)495-8015 No,I ROUN,VOLLE Lme - RouNri Rccx, T EXAS 78664 OF'F:im(512)284,43022 - FAX (512v�284-7764 April 21, 2017 Supplement No. 1 Attn: Mr. J. H. Edmonds, P.E. RALSTON AVENUE (E16271) RETL Job No.: G116595 Staples St. to Alameda St.; Corpus Christi, Texas Often, because of design and construction details that occur on a project, questions arise concerning soil conditions, and Rock Engineering and Testing Laboratory, Inc. (RETL), Texas Professional Engineering Firm No. — 2101, would be pleased to continue its role as Geotechnical Engineer during the project implementation. RETL also has great interest in providing materials testing and observation services during the construction phase of this project. If you will advise us of the appropriate time to discuss these engineering services, we will be pleased to meet with you at your convenience. If you have any questions, or if we can be of further assistance, please contact us at (361) 883- 4555. Sincerely, Mark C. Rock, P.E. Vice President of Operations 2 of 2 sa:)la.ra5 Bwlaouibug Ao ;uawpodoo s VX3l g eae E)N18a3N1E)N3 11SfHHJ sndd0o {Q Am va3mviv m 831dVIS MMMOMM MMAV JLs NOV.stlOs30 As 31VO 'ON NOMM NO W0 w 31W 'ON ms.3s 353y aaa 9 9 a� x i5 gal 11111111.80 ,dWm„r_V„.;mammaiix ___ � r�mm�mm2mmam�a���mm saa1 7 MHHHHHHH99999999.96.9 � ��u�IE ®n �aroxPoro�nns nnxnn�nsss.as::».:s� �xss �ss����s��ss�n �*�n e Li lMC:.t ; ' eN LLJ UO a "0 O ... O o LQ w 9gLU (7 cr P In wg w9 O Ll Z 1'.E Z.CL =' Cf) 1QC lilt to w'i\ rvgk g iXYIS'JOB ���N', � IE Vti OOM1m�13 �� b�yny,^r” �'. IN'JM.11 0pd w� mY dlKgg uj CL a W UCL y„w S'� v a FP Ffy/ c f ct iursa�inaaS 6uuaaui6u3 }o }uaw;aodaQ m im �°°�m.1121"„ SVX31 S310N lVFf3N3E) � ,xW IlSIaHO S(�dp20S So lls" NNisan V3Wtlltl Ol S3ldV1SON1833NION3 z W o ou S1N3W3AOHcMl 3nN3AV NOlSIVEI H w �o zm LL p awz o oz o5z sa - - 5 "ir n o - g v�iox=o a haw a zio - - - - � " _ � �ayN� > - vo - zs Qv �mK>O -o - 3owZ Q ago SRI'] U'm;N w m3o�aavoi�vi�zU z��� -m? oGr _ -? l.V 2rc NUm GOttw _ - - - _ - - � 0o3 _ _ "3 - � om� obi - wUz - - �¢- u> oag3zOo-,Og¢ 3azo"��a O OO°jj Q ��ZN� rc3Qoo� x�m¢ _ - oopo�o m tib... W U�Qtt ��o _o mai mgp- - oa - - zF� J e z� Q ¢�w ��g �3zax m�-aaom O Xwg�aFg�¢O <zd3r_ - -Zam - - � � � Sp _ o53 C"�� - - - - = zWo o aN OJ mwr3>c'�o Q ogm o�u�<o >�� �km - am - - O - ¢ � � o �� O 3 �_ ~ ���3Ua��o3U a�aomaama�a�m aamw " a z5 o¢- mQ N U oaUxmUm JO Qowa0o o -�\ O -- N vi _ ¢3zQ o you "oo u� _ _ a¢ _ _ _ ?T.i Q� W - `mo _ - oWUa op �� w - Ng x o - o �'> € oma a€ O oo Q Vn _ - - wQN�r�w>�oa pgpa _ _ mow oipo� 03 J _ _ z�F3wa mom aka w a3 ¢� `a"� p - LLQ ` aaa oaw r ;zpo z�Q z w N o aw "w - a mw _ _ sQo owm�� _w _ -�a wo k� mo�mw iso `� oo`N8m oi�w��o mom oo T _ a=o o=zx=atYQo - Saw o"o3a a - - Oa _ _zao - r >E ' zG_rc omaa� W I�� - va-- g -=ax�a���awa - - aGQ _ z�i J _ J - O aGa W " - - - o - ��m _ - cn `2 - - N �� - _ zKw - pkaog�� - p3oaaaU oza�y'=�mp >�W~a U N g 3 te 8<mp<agam-tea �� m�a �¢ ���mG�,,>�m<oo��<�<�°�� o_«�om�h��a�� a0 o - - - - - o " o U a >� a��m --go _ _ - - - �a pyo 5o z3 LL 'o< _ 00 Qui - - �a Yn� 3o _ o � m Ga Wm o�E nlE - ov�m - �3 -3WWOUo "wa _ w��UaoFa,z _ o3�a�m _ - ¢ oz o< 3n"�rc�xaomo z�mao�a _ 3 - o�o�m - - go Z o3EEo 3 m w3¢ 258 z - - Ckf o= _ - - = mo -oF �z - _ Ok _ Q " - 0"3 0 = - "o m3w� - a�cmia�doa�ow aai Orn o�Jy' a - - �[gio - - oho- _ az mom n?¢a _ _ _3o�w¢m�mocgizi�o>3 VAN_ 03 _ o - z o wm3zi _o - xao X30 - - (~ w3�3�ogzamaz _ LL 28: �m _ " o amz�_ - - Z - zmo �Ciz G Wo - - - V7 _-¢K¢a¢¢_ ?�o - o3�iJ �o .tr N _ ig ;aolna�>a - ----_ - 000m3�3aw - a3m- W -o3i¢3o¢ ao"go oda- 3�0 oo p�oxuxrms�i� ?�ozw=��a owEmo 3 3 r w _ Fa;owmw�?z"r z�U a5 W o �;wwo}zwmzUoww3mz"woa�F - o�m�3 2. ���¢" - _ - EG: wpm -- a m BG�w - - O �oa�&�om� � LL�wa > w�'� opaaooa��p�� - z4a�w� �9�=�=z� who zo p~m �a>oa�wo¢aaJ�aa¢ �z ¢vio v+aazvl¢�o�3¢v�ia�ora craxa? Fwma�¢maa3¢m»mavi¢�3w���rpm�ia�o¢a�rm S' 3ra>��a¢rm3oa v�io 3ua?r¢oavi¢�avio�¢� n n a m m n m m <O ap ¢ �Fm �266� -z 81.� 3>F�3wwmoo z'^3 - - J - a a - a v ozdvo �o ¢ omNv�i�viwo¢amarcz o pQozy maoQ _ 2Q9, _ �ozo3z9wa�z��000pz»� -zoo - mt�iwoinG4a omoopyJmor-maz coi?r�zzxyo"¢ o = N nz~ma�ow - _ a >� mz n " 5 _ w—P k W _ Y oNom��isoa�-�mosw;my""W o 3oQ��or3zFxNN�LL3"o��moo "� - a€ �mos�¢zoo _ _ _ z �o¢a o-� Qo_ o� aaa - pdm - U' m3�z�ocxi w'6�oo� aaaxi�gzo? - apo oriovii N o'�ozoi�x¢oo�a on w�mo3 pmo _a Z _ _ W; N w zp�uz3a'UzoUmo o ori gpo¢ atom? U Q g= zg�g5a _ _ woomjaYm3m�=m o. - -5 _�o�zoa6 wwooUz O - vaaav<�v�amm�w�Uon N mooawm_O�a��ma'm¢a��Uro�m� 8— ? mx xo"xmrU U wamo �3o m a3vla ar�a¢> 0 0 vim �?acmi¢� m3�cxiw¢� sa�in,aaS 6uiaaai.ri6u� }o }ua w;,aoda� SdX31 31nO3HOS DNIMi aNb h ""'"` S1O8WAS llV13a aN3031 N ww ��pd 1pyp ail IISI8HS sndvoi !o .ITIS tla3Wbltl Ol S31dVIS ro a '25ryrivann Ift R S1N3lN3AOHdW1 3nN3AV NOlSIVIJ N r z g g x � w w w � w o w d a dr m r LL LL LL m a a s s v I, J n F.o No - o 7. J z w o p p '< 8 0 N a - ®® �E loo . a 0 4 ❑o® �'� o o "�a I � � e - c c w w w �< w �� � 3..� z �e t w F e as - ;wLL w w ww www ww ww w wwp � �aaam° ° aam a._a oma ° aaa aa° ; _ w w ,w u ai c. _ zg - a o rr we5a�J^ _ to ej w Orifi _ 2 ii aaiv9i SaginaaS 6uuaaui6u3 )o }uaw;aodao 3n�w,�vw',xvxxm�e mionlwx sm Sb'X31 n ,.. S31111Ntlf1O 431tlWIlS3 ONIIA33NION3 I1SI21HS S(1d210S do ,llli z z - Crean �Ilp� V03WVltl Ol S3ldV1S ''o p S1N3W3AOHdWI 3nN3AV NOlSltld N NOI1dIE1J530 19 31tlO 'ON NOISIA3b NOI1 NOS3O AB 31tlO 'ON NOISI- iu tL m^e yQ a E a to s E w to to i5 ZO tL a m 75 a �Y :t ,7 S;JI {oAh& NY; .� I1N wl z aaaaaaa eaaaaue aae. aaeae aaeaaaauaoa ezeaaaz n3I t vl cc ,3 U w t a � W a. e w oQ mm Q :li O LLI (%J m o co Z w Q wi zo O z�� aw=� �Wm 3eivs�� sa�inaas 6uuaauibu� �o }uaua;aodaQ n o SVX31 SdVW3SV8 a31VM GNV H31VMWbIois z N a' ONIH33NION3 I1S121HO S()d210i !o llo z Nin tl43Wtlltl Ol S3Idtl1SIft & S1N3MAOUdWl 3nN3AV NOlSIVE1 S.ALAMEDA STREE S.ALAMEDA STREE � o a, � J w p _ w w wJ � a m w { LU > > a _ w QI s Q' x (n m g U) w _ s p U) Q LL U) wX _ p �x a a_. w m � C/) C/) irx x Z Z p m 4 5 5 m x J w RE R W g . z W LL CL o U LU g w , m LU 0 o ao F w w o fn �a � w Q o w w , c~n Q O O O Z ( Z a w � N � h W SWANTNER DRIVE s SWANTNER DRIVE W W Z Z i Qn X � (f) p � WF- WW w p w CC LL Of I U) C/) W W ¢ A a az zw I a P_ 8= N - .STAPLES STREET S.STAPLES STREET a 3eivs�� sa�lnaas 6uuaauibu� �o }uaua;aodaQ n o SVX31 SdVW3SV8 SYD GNV a31VM 31SVM w a' ONIH33NION3 I1S121HO S()d210i !o llo z Nin tl43Wtlltl Ol S3Idtl1SIft & SlN3W3A0HdWl 3nN3AV NOlSIVE1 S.ALAMEDA STREETS•ALAMEDA STREE _ a w w LLJ LLJ Q LY_. U)55 _ Z Z Fw w 0ul, w a m � m s Qa z 3: I RE R w w zz w w J Q CL LU ~ ~ < �o m I � o o = �. W 1— w w w Q� cn o � a Q w U) d w o z F U) o U) Q Q o 3 Of , , w SWANTNER DRIVE SWANTNER DRIVE I } I 3 w a UA I - Lu / w w w w _ w Ir Of F 1 rc cr N n O All' P o 8 S.STAPLES STREET S.STAPLES STREET o saoinaaS buuaau.6u3 }o ;uaw;aodao SVX31 dVW IOd1NOO ONIU33NION3 I1SI8HS sndaon So Am ° ^^ mvuun VV V03wVIV Ol S3IdV1SIft n o 3 Ion S1N3W3AOHdW1 3nN3AV NOlSIVH i ea p � Alameda Street •- o w � N♦ � a ♦� z zzz u a aug � ° _<Ezzz aEEE a' o _ - E cE`oEEEa EE`o`o`o nX i -- o froEm o ❑ -- 2-1m an JO P ab o f L= P CEa • °tiz �: z � z�*�> ��MNJQ ♦a 2 v v a Q o p ✓aN U O _ O !E - y�z lei Gary 1'..�M rui� G y r oFJaVER P USM Z v3dybgAN 65 s a�n raj G by A o N O c h N _ O�To byd ? � SW anter Street W y O♦ LL i f Su e � we p 151 �N 0 0 0 .(1 ss StiDQ o w dtl S �` �E ,c,PUM S3]dY25 �m NbLW 0 E � 3W31tl gA� 0 � m N 0 bb lUt S ` < eo 9 � s o�v Ne° ,f ra 2 l N J, ° w o O::m o D1ssD 0 N m c7 COCO¢ U z BONA 3 n aroa .e s° Hs T 2 as 8 s Qu eb P. n o zoy °° ° nie M3bj oj.U(: om, �LSZ a O c c Od 8 n. y � laa�IS ealdolS �) O B 1 9 H y i 6 V' o piss aan d4 �'Uz NS3 3eivsl� sa�inaas 6uuaauibu� �o }uaua;aodaQ n o SVX31 NOUVINHOMI 3NI138VI3 w a' I1S12HO S(d20i !o lo Nin tl43Wtlltl Ol S3ldtl1S 0!DNIU33NION3 z & S1N3W3AOHdWl 3nN3AV NOlSIVEI NO-1- 77 -SIAIN AB DN NDISIAIN � I s Aa AMEDA STREET R\L 6' - ZD I I I to N Cn I m Il.0 < P I,G w e r of -. < _ o 0 z co fu a � I• z w 0 oma a' I w w e � oeNm I . _ m RE4 i p o 0 0 -- z I - m ._ a L i I _ I Q° --... Grew I. .A ,-y f . y I G SWAN r Veli".R VaMV. I I.G.t �I z �as t31 0 a c2 r� G ^ r� a X - 0 raw ca v P- I - w .7 8 `'� STAPLES S S FR�M�R��r' o /� A, 6 nlsa�InaaS 6uuaaui6u� �o }uaw;aodaQ m im °�m°���� SVX31 d1/W A3>1 133HS � a' �W E)NI»33NION3 I1S121HO S()d210j !o llo Nin z z tl43Wtlltl Ol S3ldtl1S S1N3W3A0Hc 41 3nN3AV NOlSIVEI / / Alit r 1 / / / k, , No d i /O/ I I �'Q3YM4'1b IV, %1' � r ' �io r i/r/ir//i/ 1 i/% �i/lir %//, % Jl r� IMIA11 r p , /lr 1�,/ r /iii/ r / it o /W', / r///////, /,rr r� /� / %i r ✓ /�<it %�// // ��; O r / / I r / ri /N/ :"//, %///,r,i r %i�/f%/ r %/i dor j / / 11 Tr / j I i/ 0/l / I r/y / / / r�O w'a /r<r, ' I / f � ' r/� 1 / % o r /" / �' // !o F J // o /�/ r I � i % I �/ ' 0/1'% / // '� J r//rii' /p r o f , aro/ /// ii%r r- O��l ��� / j ✓r ///// r F �i�//// 0/// % �/ / r 1/ , F SEE i' =z a � X11/i, r1 J/ /ii/i� /� Alx r a a a w / s� irl �� / /i r r 3 / 1 1 / // ///% o r % r r% ! r/)l o o % / r O R J �i%/ a �' / / f /, ll 41 r / G fO /ir//r r / o %// /�„„ r r L , 1 1 / rj/� i // /i// /'//' r r z %/ r/ kk` rrr 'r aaaa �iir �j1 I rr/ I„ f %i �r / % ,If // k' t r/ // a //� / z r a aj J 1� rj O/ /i/ iii / SHE/ %, / j/ ff a / / ///// / a 3 ,,, I;/ Irl /ii/ I "i %j f /� rr r ri /j/ I�, .I r r /�% ir/ // ,,,,% r y/ I /, / r J �u I /„( % Dir ' I / NSM //i / � �� AP",:,", /%r Oi/ J / i , i M //i ✓r r rl / / ,lr� r r / r J kle w ',,;; oil" /" '/ ✓r ,, ,I'�li % j 'ii RR/, r „f ii r% /ii / /% " l// rii /�zo ' /i ri r / z 'ir / rG % /O /' } F % // 1 IJ/l// ', 1 / //r p ii %/,, ' r/ri ri 00/ ill O /r % i i j // /ia O/, o o D 1 11 ,I �/i/I I f r(/i / 'O/ i/ p^ 'I j ° "1 "", 1 p { // mil "/% iii/� % I J r! r j %//// 1/ //1 r rai a / � /5 r z (Il/ r % �l% J r/ / r r 3 �1/'i r%i w�'/ /i l ' mom NmM �; �' / ii%�r %r r ri /' /,rr J; j r / r r �r �% ILI i%/ O % //ii / Add WE rr i �/� rk /iii r /l r "N,,",A �, f C r % r 'g U/ % i rr / po / / 00 r r G ,is S314V.Lsi � /r ��� sa�inaa5 6uuaaui6u� �o }uaw;aodaQ m SVX31 (L) SNO1103S 133d1S WOIdAl w a' �W LONIH33NIcON3 I1S121HO S()d210i !o lll� z Nin Iu tl43Wtlltl Ol S31dtl1S Ift S1N3W3AOHcW41 3nN3AV NO1SlVEi NO-1- 1. ON NDISIAIN Wlidl-- DN NDISIAIN Wo.' J 0 'MIMJ 0 3 0 1^ LO ! T V Z Z a O U� m w 0 w O o � o o z n . O + 3 W + O M'0'2J MO'21 a X a �N o3w�z - off+ 0 3 0 NG O # T O T ¢3roxo�w tz O CaJ ' X Z Z J O a � a F— U 0 m Wa m �Wo o o = m o I m o 0 O N J U O N o �J Q O O a , J o - _ O 3_ � I.L V w /w + Z V! O A O ? ^ O �// IL + W + Er IL 8- :mom « m mz , e_z !—.1 1- sVX31 < >zsD10a 22IS IVod� kl & ^ e%�\m`~= ese� � gAOJ2o \\ % \ Nin ~_ ! j ` m��¥ 0 2��5 , \ \ \y \ \Ift &mmn8cW41 pmA NOISIVEI ° ; > NO-1— 1. ON NDISIAIN Wlidl-- DN NDISIAIN 0 \ \ \ + CMCO y �� ~ \ U) \ \ \ \ a ® - R ° ® - Q S\ $\ « , R UT � < ^ 2- } \ : \ : : z z z,a �\ \ < «»»» / \ \ \ / \ \ 0 / ; E : ��� sa�inaa5 6uuaaui6u� �o }uaw;aodaQ m SVX31 SNOII03S 1N3W3AVd w I1S12H� S(du 20� !o l� NNin tl43Wtlltl Ol S3Idtl1S S1N3W3AOHdWl 3nN3AV NOlSIVEIONIH33NION3 zo NO-1— 1. ON NDISIAIN Wlidl-- DN NDISIAIN pp 61aG 3 $ MM � Q W 3 rc o w M M m W. Cl) a ��w i 8 i3 $o - i3 ���� sa�inaaS 6uuaaui6u� �o }uaw;aodaQ m °°m ° SVX31 (L) OW30 ONV A3/uns OIHdVIiEE)NYA'19'WNwbYNOY ttff 3xy IlSIaH� S(du20S !o l� aNin tl43Wtlltl Ol S3Idtl1SM z WH N ONIH33NION3 S1N3W3AOHdWl 3nN3AV NOlSIVEI NO-1— ON NDISIAIN Wlidl-- 1. 1.. DN NDISIAIN e t 1 6, a14voi.Iv� — + Vl ,�.,�... " •--- _ "... ... .,OO+QL b'!S 3NhIH�1VVY 0 5 .. �r o � x � P _ m Vi' Paso`z =Pq N. r s < Ns r 0 fffllll � o� _ P < .a �o PaLL u a o� h N ow a LLP 6 Pw Po oaasww Pz � w ui I y k ,y ` mYsoo N3a�LL� 1�17!r1 h F N r w a , 1 r=. yr 3� ' LU ul F 4 , h z �y A w cc o F ✓" LL d P = w _a x yv,, - w o _ w s _ J oH H0 �ao - �oeo �e F 00+0 V, �-...... A,WV1S 3NI�3SV8 ���, 00+9 V1S 4W✓s�l sa�inaaS 6uuaaui6u� �o }uaw;aodaQ m °°m°^d° SVX31 (3) OW30 ONV A3 uns OIHd`dliEE) N NYA19 WbYNOY ttff 3N1 a''Nw ONIH33NION3 IlSIaHO S()d210S !o lll�WH z NinIft Iu tl43Wtlltl Ol S3Idtl1S S1N3W3AOHdWl 3nN3AV NOlSIVEI 00+9L Y.L 3NIIHJIvw oo+oa vis a _ k k 1 w w ��w o�= w w� 5E W�aw ma � z o a� .,e'V 00 W O ,y (. a co_ e r r, w ui w CO) O w y, > cr oLL w x p u y _ o , 3 X, m a Qo �pNz 0 �w w wo ✓G�` I b a my ., r.r +n+>•+w+GaMli+ r+�j� � � � � � �rr� � OO+OL VIS, �NnHolpW �OO+SL.d NI-HOIVW s ���� sa�inaaS 6uuaaui6u� �o }uaw;aodaQ m °°m ° SVX31 (E) OW30 ONV A3/uns OIHdVFfDOd01 N NYA19 WbYNOY ttff 3N1 a''Nw ONIH33NION3 IlSIaHO S()d210S !o lll� z WH Nin toIu tl43Wtlltl Ol S3Idtl1S S1N3W3AOHdWl 3nN3AV NOlSIVEI `"i 00+9Z V3MrlHO1VW. x o € m ox m �z a3o a � tom onA AV €oo €M o s41 t✓3 Sgo c w LV �zw a maw€ o a allo= z�o wo�� oaa tu ��-� <� gem=>= Nz m is oo` �a a z� p a ww��wow 0 rr 4— o z o €a o ¢a , =Noy oa e ro�a ��a", �„aaFw �m < o Q p N<oz ahao oy �� N' z” m € �w €�o< oaf 4�w < x�z ° u 133a1S Va3NVlV ,4 OV b� H W — — qq9Z VIS 3M—IH01VW nVsa�inaaS 6uuaaui6u� �o }uaw;aodaQ m im °°tm°����� SVX31 d`dW V3li`d 3E)`dNIVFid ^ N I1S12H� S(dVuary20� !o l� Nin tl43Wtlltl Ol S3ldtl1S m z ONI»33NION3 W p SlN3W3A0HcW13nN3AV NOlSIVE1 N r/ % i �% V, r' i W11 of %r,„ / 1 /Gi/ //iii/! f&y,' r mon" j J rri / // r "�% plj//�,//r/r/ jii,,n r % r %i/ % ///rope I M"Af ggg q/10, % j r �� / i;; '//i / �/ r / % !i' IV, rir ,/a r//ii l/ / ��ri l ' l //'," / / ' �' rg ri/ / :J is / /' irr r// % 0 ,,,, , /✓' - ari J/; r/ / r ////� %; A ii / OfMe ,,, r i, r r it /; r/r a"�� I !/rr� MUNI, r i a r / rii ! v r /riii / r %/%// r �, J �!_. r,;,rr / ' ra / !: r// / i p/ / / i ,/r i /3, / /% / �,,,;;, il, / f/ %// mg i/ // // ?rii! /, / �, �" //ri�/ r/r //i g� / vfW / r r /,,, ' / r // //// /MR, // / iA/ i%i %a "if a % r / M rr / ' /; //„ / 1// rOr /vii/rilo'' % Ak / rj / dJG .VR�8 lA� irrniv it 12 .1., lu / 400 r a; 9R 3"J j f � �rl��lw gr �I //f fro i$ gni /' / r O% r1 i %/i Of, iii/ .i�/r/ %/ '; e r J r pia t a rrio ;l1S �13N1NNM /p/ yv / rir /�,/ / / j %/ 1� r /l��r n / / "Al rr%%%J jjl „ i /r /M/ „ , i / r� J �i al a � I �/r'o, / MR,� s�fill r J r ! rr �� rii ,„ r IV I r i o / ip r 1%w' / IjJi // arrr r/� �� rl, j /p '� �aeaa�daaaeeaabe�eeae�e� / / a r 4111r //' / iOp�/i � � aarw x r / �a �V a r of /, r d R a a a // / r r �/i /l✓ t a v %/ opii/ j i/ a r r z z / /' / /r / g � r // �// rryrr rruriri��rti ryrurr rrr�� iffill / / "//' / E 4 i 5 4'i 4 i"f 4 1 5'M1 4 M1 4 % �!�` t ' / j % pp r a pi s Wlgv .1S S3 %„ a / .,,�..._. / it rio dt 1S %' i„ W.h/las saglnaaS 6uuaaui6u� �o }uaw;aodaQ m �i svx3i (L) 3lld0ad , 919 WbYNOY ttff 3N1 IlSIaHO sndaon s� lll� 4NV NVId tIMMNdO1S dNV 133a1S w ar j a s !DNIU33NION3 Nin tl43Wtlltl Ol S3Idtl1S �'°' Ift S1N3W3AOHdWl 3nN3AV NOlSIVEI a I I i hrvo I 1 05 VI 3 3NI-Hoi VY I 0 —� - I 0 _ I I II 11 - Ii - I I t, W oow Ow IN tt wwr v , +j c I3�o A { I I i J l Y iJ e a M" q4 � •�'` w"'Y� �:r � 75 �i�J � l� d 140 e d o o � w J� s _ � P -n P 00+0'b1S WVIS 3NI-13SVS 1 1 b S N l3 d sa�inaaS 6uuaaui6u� �o }uaw;aodaQ T u� �= svx3i (a) 3I1=10ad , IlSIaH� sndaon !o lll� 4NV NVId a31VMWa01S dNV 133a1S21HP 'm - ONI»33NION3Ift z Nvuun �IIV43WVIV Ol S3IdV1S o SlN3W3AOHdWl 3nN3AV NOlSIVEJ N w NO-1- 7777 ON NDISIAIN Wlidl—G M . a � r- H v ,: ail s -ego _00 nHO1VW �� 0L V S 3 Il V «e � N. ps (. III n� F3 " a w ' w� a s ` o . SW AFt SO ,I II ,s i m W 2�w Z g E bkv 0" Iii� ,rm W dDO v mm a. oo, w=w Ivo o� RON Kub T7- 7 F7 m o w w ------ 8 00+5 yl 3 �1VW 05 1 31� � V o ll1 sagin,aa5 6igaaei{i6q }o qua w;,aoda� U7NIal�NI JNl 31 Oy SdX (INV NV�d a3IV1VMMWaOTS (INV 133a1S I1SIbHS S�d210S !o Ills s °mm rv. rivoun0 Va3V4VIV Ol S3ldV1S .....� S1N3W3AOHdVT 3nN3AV NOlSIVfi r_ m m ` V I „ NOISI— n �1S NIIHDIVIN 0 + 1 NIH 1 W so INIn _ S W u rc w v w x O q r _ al '� IL >' All j I r fi l Jo" i r i w U w --------------- Q U T A d � °_ z O °� r cc � � I I = v 2 m� 00 - a d ' ,:�+✓' fir- / µ. 14, '+011 z oap�, i r 00+0 1NIIHOIVW 11VIN sa�lnaa5 6uuaaui6u� �o }uaw;aodaQ m nrw B otmu " SVX31 (b) 3I130Hd 4Ntl NVId a31VMM101S dNV 133a1S — a' ONI»33NION3 IlSIaH� S(1d210� !� lll� z z mvuun N VI� tl43Wtlltl Ol S3Idtl1S Ift S1N3W3AOHdWl 3nN3AV NOlSIVEJ NO-1—i 1. N.LAIN Wlidl-- AB DN NDISIAIN Ass e , a� 'Yu...� v, I � m� a� 00+03 d1S 1VW t s'� 3) Lil NLu 'o - ii � a I h _w + A 6 U o'o)to+e vx 49 G� r & l S6 w a aao''lau 1 a � D 1 1 o � I / I rc ) of Ifs / e n F w a ox '"6 m� w �. Y.s / =m / .r i ) 0 i 8 m n 94 c e A ar a_ it s a 1� P) Vad €a .a A. �I M` 3 m m I ) r v 8- - - — - -IlHJ1VW 54 V S 3N lH 1�N -7j d� Ma saginaaS 6uuaeSVX31 }uaw;aodaQ (5) 311JOHd n, 3xs �w;nsrxp xx sxr ONI»33NION3 I1S121HO sndaoi !o .11li dNV NVId a31VMWaOlS 4NV 133a1S o z jg Nvuan II WAHVIV Ol S31dV1SIft N' tt S1N3W3AOddW1 3nN3nV NOlSIVEI �2 v11 00+5 1 3NIlHJ1VW:' 0+ Z vis 3 41140 LVI Of LL s , LL CL e o v11 n II� V 3 a w e n n l I6 v$ 1 s1 I Y r,e i 1 � II a I 'z, ° ir ddo w 'Il N rc � I F rlf ra d 3 ' s� s ... � r i � e I , - .. £ " ' ¢ e i1r � a i a q m ® Mvrnz vZ aaa.e r W44, �i \ % 5'm % 5 3v�.rn vclasco iorcan %- n I e x I " ' pOt07 �Vll 0+ Z VIG314111OLV14 ' r x xe F1 i saonaaS 6uuaaui6u3 )o }uaw;aodao m (9) 331dOad n . SVX31 IlSIaH� sn�dIlp aon'jsa 1S " � V43WVV Ol S3dV1S "dNV NVId bJ31VMWaOiS 4NV 13a ONIH33NION3 s� Ills �o �o SIN3W3AOHcW41 3nN3AV NOlSIVd N w w a� 'arc - �'��ww boa <wo `wp e���a o2N g€ W�U vim SG'p _ row--- - g w W W > w Z W Q J LL 0 Il , w w , _a y a a r 133a1S Va3WVlV «p a rL om= g _ o � ;4 C J W G tB)� g Z V F MJ nF 1� 0+ Z V S �n ���� sao,inaag 6uiaeau,i6u.� }o }uawaaode� � SVX31 w inoAVi 1NIOP AIAHONOO n NV��111 loos jo uis w a w ONiaaaNiONa ilsiaHs sn 0 Vd3WVlV Ol S31dV1S N i S1N3W3AOUN41 3nN3AV NOlS1VH r_ ° tL # d1 'IHOIVW 00+ � 3 I HOlVW -- - IN A, x , T., W r r yq i W -�� � _ w Dy d , r 1 _ uwq 1 s s / � w w � . 133�11S S31pYlp w Z I __ ° --- 00+0 00+0 V1S IHV1S 3NI13SVS 00+5 VIS I, DIVIN ll1 sagin,aa5 6igaaei{i6q }o Cua wC,aoda� SVX31 (Z) inoAVl 1NIOf 313HONOO h z N s Pow ONIH3DNIONl v 3 I1SIbHS S(7d21U� !o Ills a mmrv. mviann V03NVlV Ol S3ldV1S a a S1N3W3AOddWl 3nN3AV NO1SlVIJ ME M �j +g 18 NI-1HOIVIN j + iv l`dW W I 7` I � f ?Y 1 ou+d� C IPA I - -i ° o y pf Q .a ti r � w 0 I-IHOIVIN o ll1 sagin,aa5 6igaaei{i6q }o qua w;,aoda� SVX31 (E) inoAV1 1NIOP 313MONOO n z N US !o Aiij s ONIH33NIONl ai " mm ry ...................... N _ 0 Va3WVlV Ol S3ldV1S a 2 t S1N343AOHdWI 3nN3AV NO1SlVli r_ 00+5„ 3NI-MIM I l y z CC oo— � „y - - - � 7 r � a � F imuis ba3wd-ib I A u ^do r� . +0����°a�1 app a oo i � s�' N s re ���� sa�inaaS 6uuaaui6u� �o }uaw;aodaQ m im Tm°����a SVX31 (L) Sl`dli31Vl a31`dMWIiO1S � N a''Nw ONIH33NION3 IlSIaHO S()d210S !o lll� z mvuun N Iu tl43Wtlltl Ol S3ldtl1S Ift S1N3W3AOHdW1 3nN3AV NOISIVEJ NO-- 777771 —SIAIN --N—. AB DN NDISIAIN R U LL ma Z Z e N a sotz.au 0 0 � t w3aAnaa YLU ) `s co .., se ez ne sz wx 11 cc cc d9 VJ VJ M^ m W � 8 Uo Uo ag l = Wo Wo co O O H H C co R ) C,a°ii�j s°c sJ - Z % Z O sb O e< z a�a ry ry o U F— W.a W to e O ;tits /VI sagin,aa5 6uiaaei{i6q }o qua w;,aoda� SVX31S31dV1S 1V NO1S1Va n rJNIa33NIJN3 ry v IISI8HS S�dvoo !o .1115 - S11V13a dWVa sHnO NVId1S303d a °mxds: i N... ' �IV Vd3WV1V Ol S31dV1S a S1N3W3AOHdWl 3nN3AV NO1S1Vfi r_ o w � r g — — w w u a K w _ a go — Z 0 1— �a J y LL p I d®3wd,a _ 0 Q s. 4 n rr a 0 0 uj CL c� w Q J - -► Q U) 0 U S3,ddIS a sa�in,aaS 6i,i,uaau 6u }o }ua w;,aoda� rug 3x �rv�v�, �v�3wa. SVX31013H 1V NOISIVU w ONIa33NIONA IISI8HS Snd21 o }o Aiij - S,IV13® dWtlli 8ljf1J NVId1S303d `w i mviann o V03WVIV Oi S37dV1S 'xnry S1N3W3AOHdW1 3nN3AV NOlSIVfi r_ NO-1— M N.I:j N.1— DN N-1— � r _ � a o z Q 0 -- .. d \X 1 r ¢ S 5 �s ,a T ' z en / Yl// J;o ` U / w s o s i� f �'' 4 W✓ul sa�inaaS 6uuaaui6u� �o }uaw;aodaQ m im �tmu���° SVX31 (L) NVId Fi31VM IlSIaHS S(�dp2OS �o 115 Nin tl43Wtlltl Ol S3Idtl1SONIH33NION3 N z S1N3W3AOHcW41 3nN3AV NOlSIVEI o _ - OO+Ot v1S 3MIH�(yYy o„ ww — 9 w a 3 � r Pa s , m M . = w w —.... > > W , — zQ � _ Q — — — a � IL W � ® Q s� 41 ziI a t _ _ r -- <s w' Sal b'1S 00+0 br1S ltldlS 3Ml3Sb'8 �...-�'• " " '�� 009 l 4m✓ul sa�InaaS 6uuaaui6u� �o }uaw;aodaQ m im °�mu���° SVX31 (Z) NVId d31VM IlSIaH� S(du20S !o l� M z Nin tl43Wtlltl Ol S3ldtl1SONIH33NION3 S1N3W3AOHcW41 3nN3AV NO1SlVEi 0 +5L01-MCUM 00+02 VIS, (1. o Q � I I o d m w , I ` I h I r I I I o r w _ > Z ZQ - 2 — - Q © a l 3 IL p x a I zI — I �w QIv I � i m Ih � I O - t � I J I f r, � I ' I VVVV I „ t m 13 >w — I OO+OL HOIVW — �6+ 1 — M111—mm a �ra 4/ulsa�inaa5 6uuaaui6u� �o }uaw;aodao imrvuw rvo�s.i�un�M t0 SVX31 (£) NVId a31VM rJNI»33NIrJN3 IIS18HO sndaoo !o uo Ift my�n V43WVIV Ol S31dV1S MI S1N3W3AOHdWl 3nN3AV NOlSIVd NO-1- 7777 ON NDISIAIN NDI-N—G DN NDISIAIN i a cry �. 00+91S- ` NIIHOIVW , IF W � a ' d Z�. 39: w J Q ' z z J CL r. t ` z kt I i n x Nn g� 133d Va3WV w� � T I � w <w w �o LL a w a w r ' 0 . r 00 � W w iv r � a :vim « m mz » ; SV 3 s d 3NII a k: & ^ ^ e��vim, ~^ ese� � qAo J 20 \j \ _+ > N � m��¥ 0 2��5 \/ K ) ; Ift &mmn8cW41 pmA NOISIVEI = \ � - ) � W\\ ®d w « 2 � 9 w R, ; ®Z\ \ } \ w e _ « _ \ � � m §! ^ w . _ W\ _ iL-. « : - 2 ) } \ 9 w\� \ � , y � \ Wl « � lVI sagin,aa5 6igaaei{i6q }o Yua w;,aoda� n IIS18HO SVX31 !o Aiij 1 (4) 3!DVNJIS ^z "w ONIU33NIOND ssnd21 N as g ...................... CO _ rivoun0 V03WVIV Ol S3ldV1S MI S1N31N3AOHdW1 3nN3AV NOlSIVIi i FROM u.7y C `dl ' �o +dG t15 3NIlH�lb'W v 4 k� n ` .. aaw b ooin � � owe-. - -_ z a - . � 1 1 wo F i 1 a ac I, % I o I — Y 1�Y Y 3ldV1S - �� 00+0 d15d1S 3NI�3Sb'8 1S +5 lVI sagin,aa5 6igaaei{i6q }oSVXqua w;,aoda� N a� 31 (Z) DE VNOIS n w Pow9 ONIa3EINIONA ilsiaHs soda0o !o Aiij s °mm rv.yrivoun0 V03WVlV Ol S31dVIS S1N31N3AOHdWI 3nN3AV NOlS1VIJ r_ vat� 00+91 e IS NI-lHOIVW 00+03 VIS 3 IVW h ,y oll - - - oo.v L oo- W �;vt� W L_.... w LLI ui cow Z - cr- e OR w r � u 191 —00+01,! IS NIIHOIdW — j 00+5G� HOIVW _ lVIsagin,aaS 6uiaaei{i6q }o qua w;,aoda� 1.�« SdX31 (E) 3rJVNrJ15 r`z Pow ONIa33NIONl IISI8HS Sndvoo !o .ITIS s V V03NVIV Ol S3ldV1S co g `4 Nf/NNI1 co a ' nry S1N3W3AOHdWI 3nN3AV NOlSIVIJ M z 00+5 , l �`�3NI�H�IVW', ' gni:on n � 0 „ ._. J Ell Q o pti r � 31 71, ON 1 3d1S ` a3WV,V IT a q , M � f � L ,. .. - I r 1 = l\Ir9 Am"ILl , - - _ Will s, o_ a- OO+OZ dl 3NI-1 NI sogin�aag 6uua�i{i6u,� }o }uouq,md�� � SVX31 NOIlN3A3ad NOIlf1110d a31VMWdO1S � w 8 & ONIaD3NIONDIft IlSIHHS SI1dN0.j !o ,Ills i4voun ....E131.....INH ��� �I, WANVlV Ol S3ldV1S m� ' S1N3lN3AOadVll 3nN3AV NOlS1Vfi NO-1— N �j NDlidl-- Vl �p�1VW 00+ 1WOlVW w , w I SW g'CFIE'� , IF O w cc �., n 1 w _ _ W {p = --- -..- .--. .. A I L33lj1S S3-IdV1S j _ 1s-- m 00+0 1S 1dV1S 3NI13SVS .� 0+9 Vie NI 1VW lV1 sa�in,aaS 6i,i,uaau 6u }o /ua w/,aoda� SVX31 V) n w NI'1%s�il °s }° �iis NoilN3A3ad Noilm,od a3ldMwaols S3N` IIS18Hs snd21 7r a Va3wVIV Ol S3ldV1S M 2 r S1N3w3A0adwl 3nN3AV NOlSIVfi r_ e 00+9is ' NI�HOIVw 7 00+03 VI 1`�W 77, 4` TDow w w > o.� x oo- 1 F IF�' 1 I i w W L_.... W �2Y z ui6 �s Q Z Q � o cr- 5. a. da �� i r � u r" r r r - w y. , 0 + 1S NI�H�IVW 0s� I'IH�1VW lV1 sa�in,aaS 6i,i,uaau 6u }o /ua w/,aoda� wy 7NIal�NI JNl Ol h 3N` IIS18Hs Sddd s !o .ills N01IN3A3ad NounllOd a31VMWaOlS a s °mmdrv'Srivoun ...................... M 0 Va3NVIV Ol S3ldV1S a 2 S1N3w3A0adwl3nN3AV NOlSIVIi r_ I 00+5" 1 �MIIHa1Vw , �. .. .I w 33 w f ' k a z j s 'd Ef CC x �. oo+Ez I I i o a I l 133a1S ba3wV-iv Mul x i — i — 0 - o— a_ 00,+OZ VIS laV1S 8 >. 00+ Vl 1 3'`3NR3SV8 Sao�InJGS 5uuaaui6u3 ;o ;UGW;Jod4 c JO L S310N NV-Id ice/F986(8(m�L o ry Asx _= tl°w e ry S7X31 N011N3Ad21d fl- N011nod ?EiVM Wa01S 2 %� JN1F�33N1"JN3o rv� IlS18HO snciao0 jo ,1110 uslaHO sndaoD eo ulO a a Nvann S1N3VGAOHdINI3nN3AV NOlSIVH �w a 003 Now `= a TI��� oNN owoww� U aw. o� �zc�i S. �Q'—IZ z �¢ W o z m o G OF Z?w e Om D o w a z z a o 0 dF Nwz ��nr D oJo ¢oo�n� jz mz - oz �sw o o r ZQ O z o wxz ¢ C W JJ zooz -< z W' m0� w4za dQNo3 wdz' -tea UUIr06N O iw 3! ¢ vgw �aKZ� z �JZ g w o ¢ '�w� Oo ww 6N�UFQO W a ¢r o � OEF x x a s< �=�I�� W cn o Di — Q G o _ o - u - mho 3 0 3 J *.0 Y¢ 3 W w ¢ U o � U w 30 v F N oS ~g ao wa a ¢ da w m r QO z of W N _ _ N¢ waw o — > W w < �m a m w ¢m z V QUI Q my w a3 � in ¢ zm �,.�,� JY¢(o r ¢0000rcoOn v. a �x w'o �w wzd Q Hw� d � V�SttowoddyFxwwHF >m I N � Kw o¢o O lo W Un Z N w - d ¢ � Z U 6 Cl) � C] a W z o ogg a1, x a = o �go e o 3 SGO�IAJaS buuaaui6u3 ;O ;UGW;Joda4 c JO Z (OId3) S1N3AAOO UNV 03f1SSl n SVX31 S11A2J d 3V1N3ANOMAN3 2-OIVM A2JO1S IIS18HO S(1da00 JO .1110 US16HO sndbOD JO uio a �ON1833NI•ON3 a m an..' ..tlgry S1N3W3AOddW1 3nN3A`d NOISIVd of E 'E a v o y a o ° � ° E ° - ❑ ❑ T _ N E ° « E a v o E TEo — E c ° .c z - a O u S S a o'n E E a „E Ec= E r E W� ❑ ❑ ❑ .. � NE,E E FL 1. SS S $ E E _ - aE000❑Eoo❑E - "s 6 3 _ - - 2 a v ° m € « E oE a � EEEEEEEEEEE a � w ° an o r as v « Y d° A a « ° B EiA E E 0 0 E E LL ° e o x u F _ ° E m as ❑ a �' ° <° 3. z ❑❑❑❑❑ rm _ a m w ❑EEOEEE®o g sao�InJag buuaaui6u3 ;o ;UGW;Joda4 c JO c S-IIVl3Q Q21VONViS n n�i mea �xi � =°da.���" S7X31 N011N3A321d N011fl-nod ?J31VM Wa01S _ g A W xi U-11aHO 5ndaoi jo Am USINHO sndNOD eo uiOmvuun a `""' `JNI>:333NIrJN3 {... S1N3W3AOHdW1 3nN3AV NO1SIVU N.I.— Sip �@�s e �s °JAI B ooW "� V !mP� €o��� 30 R- '.9.- Z-6 EN. www B=�w3 s F =_ gra as VR z ROO El g o m J Boa°K W smg3 ssB� $�W €oQ,B I " 8- O 8 W 88g w W m -V w z 8 _ fib= ��o '11 ap6w_0. w. m semi foo oa GQ _ C. z H. w �6 �¢_ w -w gg $ i owNw w w. zo z� Ain z&°w zw 8 J d �- z�_ NA EEK ¢i =g W f o -s r 5'5'a F R NQ S w' g Z � §N 8 'gm�.QN U PH A 03 - a ���� °�o mo pyo jw Qo Q O� Qe�go=- N. Wo ° �yvj i�2 = vWiwp�m�me��s �� m€ s V ®=w� 9 xieaa¢ 3 4'0 b �x r 9'� N6'o `oGl 3z Vis' e°� 9F � ° W o€"���-..85a "ox X r� 5 r Z ENAN mmaou.a J <m Wa W° �� B Yo WPM w w- z. F. mHE— _ a o a � �_-gy m w.p M s W �w 66 0 � O N°wp. was Oe 3°�'-w o i, -z r< F; "� �§ ° I. lansn w 3� 4w Z \F e�w� ��:m"A�z.w e w a ° °o £ m F gg z O� a , 0 t o a Wig rJ � _ � N1. 6 "o5Jo�Hew�p Q V w �kw°= �°'068 0 �J° m = Z 9� ��`� �Cw "__� ��a °° _ oNm<€ €W w w Y� �¢ 8"� "3 loot/t/sl eclat s3dn soo!nlaS 6Uuaau!8u3 ;o ;uawyodap 4 d0 I SIIV130 1N3W03BW3 OW 0 3a'rowdu'�tvadrnwmluroium rM TUNOV8 v SMO N IVd3N30 W31Sls NOI1nei&s10 N31VM P °.... "�a"s°e'"� Sk/X31 SIJV'130 Oa'dONViS N31VM _ d r;sn Il SINHO sndaoi to Am uslaHO sndaODeO uIa •nas�a�'•.:c `ONIaz3DNIONB �o H;, x NVumn _ V03WVIV 01 S3IdV1S I ...:.......:.......: g m 3nN3AV NO1SIV8 N00dItYJ530 AS 31x0 'ON NwsV.3a NOadIa0530 AS 31x0 '0N NOISIA,a e �l rxN�N,a x 1 x o $ a aN la, �z IN - Os w �ea � eW � e 41 h ,birare nNv .zt X 3 ; 8 �� o $� eeffia@ W.r,zsxa da3 ratr.o-,e-o 'V q Cd 'wa.a>s3ew aai wm.e-,r=a �W tsio Z 454 k Z Aa ,~ ra z Z fix:W c� t44 2 g^sWCl X30 I ` �1�+ g�5 O R m flo�2�2� �� � �•� d`i �i k W m e m a�� SWy oy RO ���k�4�4 �; Vi U m22i�ttWuWS= °C mS Oc6io = 2 W�=V 2 �O Wcx U C i. RR4 UtTJp SRW i C W � GW � z Y� moa J m �1 �u m SSVV y�yy a W NO W 2W � � N Wm�girl R�aJ �0 m ga �o WW s Fjj yy,�WW WeW� w& a y� QWW 2 i� ~W 4�4 WWs i 0 �2 °W ,N E _ y Qi yW� 11��++ y� g�g q�m�� oa m �'� �kn�Wb' ��CSWS� g❑g❑Bo$ 4�o m ��� Wo W°� ue '� W `� 6 aU 2 02U2 §W, yr Cw 2aUU 3 O��a ~ a' SS UOOU R WW In y Q Z�Z FWO W SSSf CZ �2O ACU WY. j� �~ �5 Z mW 7yy �0 � ¢ WmUm ,,Z_ cW� y� �22QY --- Z 1110 �6 mw. $2 i a; Wo Q p �U Yy NWe°�� NI° W gWU � a2O m�,> oz'k s� 9 W W ��26` p VmWi (OSS WWJ 2b� y2zs4� OgWy� � ¢2 �C 2fi� YpS3`2pLW W ° m U 2 wV CJQ V �Oti vQo o n Gmt/i/s)esiet�n'u Saa!Nas 6uuaau!6u3 ;o avawpoda(7 >d0 t pal ONV xoe 3AIVA'1NVUa),H 38IJ 40 3LLano §ILL XOs'a'NYiddY T3S lHl o�i[ao on'°µride.s.°�d S'VX31n SiIV130 awaW1S N31VM $ a m Fds -' `�•4'� rva�,3,� I1S121HO S(1da0i to AimusiaH3 sndNOD eo Alli a ,.•_ 6..e�c,' `JNIa33NI`JN3 NV8211i Iftv43WV3V Ol S33dV1S � $m �a.� 3nN3AV NOIS3VU woudla a xe aiw 'ox uaswu Noudl— ,.e aiw 'm+NO— n — V (dU)u3uro v awo ` 8 SSS Oe �� r S �� , Ip g dd, 4 12 j .WM QAMONS S p a � s �w � Nis _ h b o 9 ffi 14 �� N s n I fi # ai saa!njaS 5uuaau!6u3 ;o auawyodap a d0[ 1nOAVl wvA'.va W o M. SWE0 H3SIH'S11V130°JNISVO'S1N3Pl15nfOV ^ N v'e'x�oH i rcawpi ae a�raowrx� �N �n" r IM�swxr3l ooczt�, °d,s;�s„° SV'X31 S1IV13O OaVONV1S N31VM JNIti33NIJN3°Nwd„"e1 IIS18H3 snd2103 to Alla 11SINHO sndHOO eO A110 �I eax;. NV82111 —— tl43Wtl3tl Ol S33dV1S $ 3nN3AV NOlSIVU NOadItYJ530 As 31x0 'ON NwsV.3a NgIdIVJ530 As 31x0 'ON N®s . II �II 0 IN " 114 � $ �g all 14 i2 d! �iv M lei 91 9 > � r i >RISS 99 %In N : s@ � Y o R Ea ill.-If 3 4111 V� I on 0 g ft 91 k � m � ° , Z s Nk W all lm 48 saa!njaS 5uuaau,bu3 ;o auawyodap a d0 a (O WN/Us)asia<��n SUMO OW S1M130 33IM3S 01 NNW ^ N 3d�'x�na iswwm ae auxsavx still SVX31 S]IV13O ONVONV1S N31VM mss susNxudxav ms ax< bBta�°o$:'°w���r�e.°,°�" g N m w" IISINHO SndUO�!O A110 �> �"',•"°, '-JNIki��Nl'-JN3 ilsiaH� sndao� �� .11l3 �� a Ift ° d NV8Z111 -— V43WVlV Ol 833dV1S $ Y 3nN3AV NO1SlVU NOadItYJ530 As 31x0 'ON NwsV.3a NgIdIVJ530 As 31x0 'ON N®s . tl� IN ly s V We �a ..s-.r ea-.r• x �St V ;� r qXB � `y gg R SY� U � Zo Za o yy b a b 6 14 _ Sj IN 6NII Z-3 ¢ios/ds)esiei xxxi sao!njag 6uuaau!6u3 ;o auow»odap E 30 s x„ ems" STV134 4aVONV1S ?J31VM W801S SVX31 n $ m uenoxa sw no ausnsm ms 3� Eo�«�o N^a^ s;= *�g �h usiaHO sndao0 e0 un N d; Ilsl8HJ sndao0 JO .11lo ONIa33NION3 Nvaun V03WVlV Ol S33dVIS 3nN3AV NOIS3VU xoudiax3a xe 3iw 'ox xasuae NOU-53G ae aim 'ox xaswa 3o d s � a 30 0 o „ so , sn m =o a sr RY is t ,6 8B �3a e 8 e g s x� iSlStl lIE� m a Fl n vi � y € mann r Z 0, "� g�mvis� � W W SR W � j J di I, P � C i'pFYF p� exno so cars \ ta e \ 0 } �g J exna I . � . tiiaz/tlsl solei s3au soo!A,aS 6uuaau!6u3 ;o )vaw»oda(7 E i0 Z SlIVl34 4aVdNV1S a31VM vlaols n n SVX31 g m W.«oo '3Nrva3„d.s. rvtlu3Jtl1 I1S121HO S(1da0i to Alla usiaH�sndNOD AO uit) ONIa33NION3 ' oD _ n mvuun Va3wVIV 01 833dV1S 3nN3AV NO1SIVU NOOd19o930 A9 3109 'DN N0191n39 NOMI... AD 3— 'ON N0191A3M L 4 a SA a a .9 WIN.0-.1 .9 o o ho d g p= Ag .9 .9 Npn u n pa atl ¢fid G ° ^¢ ` l �¢ -� n° `gyp' MF ^ ^ n w o p”N n a - m �'� 5i er W (1 U p � o 1. W d y w L° T T 01. T 4€ aGY a - g 9 NX < sa sg I,d335) g 131— Ol 53i9Yn ,D.D L C�hiyopo &pornWg �Jy MoIRE HO _ `de o; 83ooi I^=fig N IX, ON,Pill `� 6� :p hogi�gig �W oG 2 fan = _; 2 V � �$tj. z / VwwaE > " n I a p a=W 4 d' _ t ^oo —� 1-- F eEFn o o p i w C 70 3 � i� C �� 1 / ¢ �9 -o-.t -oa s3iarn s , a a �¢ NIP.9 pN o=ep � $ o Ww=' � N o m WV" F Wei al - g 3 J ml o $G m�2i p E REp a p ���. isGm� 3 w`o jla f opW - m w g gS � � .: � " 121 1 640- 40 IS ^ 4) =gym " p ^ W 8 m� �a " �- _ d ^o e i = N �� Wp m j2 vl tl n gWHyp�i B pI Sp u £ =oMg- .5�+ �� 53iNYn .9 xwG -x$ NIP.9 �sggg Ld th LIZ o --if E s w > m " o 6N<W e a (p is , Ln IZL o ma!AjaS buuaau,bu3 ;o auawpodag c 30 c rp Itlaz/Usl Nlat�" n N SV'X31 S�IV134 4aVdNV1S 2i31VM W2101S m .n"re'xi"`isiauo s �no'd (LSINHJ S(1dmoo AO Ula g N �a "3 n< z., I1s18HO sndao0 to Am a Nvimn —— 1143WH3f/ Ol S33dV1S 8� ' 3nN3nV NOISIVE1 NOadIEYJ530 A9 Lw 'ON Na99aa N°1d 530 A9 31N0 'ON N.- IS dill Q € � �a $$ s VFW � ws �5 s V -Ds bo! W� W- T 2 8 5 a $Ta p Ale xg s w t4 P WrYo4ts Nig s Ph lk �§ •e xm §K li 8n. gi o� Mv 91; Was o� a o Z b � m�'NIA � \ �SNVId NO tl° 0313Q SN ��a CL 4 — —� En c 4 0—d X p \ Z. Nhra A I I A 3W�S s� RAW foo e# a� p I .z 0 § /\\ SVoi Bang lO 9JV9°� I S pppp� go r gig y V o SaalAIag buuaaulfiug jo )uowpoda4 c 30 S7X31 SlIVECI daV4N`diS ),VM3AR34 n o I121H� Sl1da0� !o Aim 'Z sndNOD AID U13S1g ONI833NION3oNWtlu3d01 0lg __ 15 Nf/821n � M.. V43WVIV Ol S3ldV1S 3nN3AV NOISIVa Xoadlao630 AB 3109 'oN NgSLVa woaeNYe530 AB 3— "A w 2"A E& Vo"Aw2"Am& arc;.IM p .a 6a .r,itNa sl: s.r� o a x x x a d.ry - . _ 3 � �Lp e w n ax•"i mm-•...... ..nm..lm mmmm -)..mem..m..m.ti.. �m.. .... ^{..�. m.� x � � LL me} w <� n — - — - — - - — — o< 4 oQ w o� a31NMA 531aVA (B) NiIM3J15 n311 N8a (e) NlVM3al5 53BIVA oli3 (mmsU F (a) r w _ al3NLSnN3I 3— u "' \. a (03amow") _ _ (03alflo3a -NIX rc NV3aB 3mo 'NF &NI 6 om S3WA �� a (V) 1 o f /' J suw 91WA (V) I FFFF I m 4� m m w � a 0 a 0 ^ = n a w N � m � . ^ � m , m ® � m I o� Zb S�1 m am (r) N1a ^o �� a3N1VA miN \ —��z • pz� 1 0,"� r m MI \\ m (a3alno3 I) I .o-,c \ ` 3" (a3alnow dp � •o-_¢ o 5 •L \ z m �w 6 �� n 6 U Y o A m 8�0 J Saa!nIag buuaau!fiug jo )uawpoda4 c eo z S7X31 SlIVECI daV4NV1S ),VM3AR34 n $ r uSINHO sndaoa AO U13e° IlS18HO Sndaoi do Allo a a �. ONI833NION3 ...... � Nvuun V43WVIV Ol S3ldVIS g m BnN3AV NOlSIVH woudiao93a xe 3— 'ow wasu3w woulw ua •e 3iw 'ow waswa II�g A,Q 3wn f J 14 '4 1 g Q g a%a 2 $ 9 Q ° cdw � 4 �Rx €o gagRX y x 14 w m w QQ i& �o 3N3—3— I tlt,Q �WC I I TO uwaaowa 4 o 3a ®a 5, o q gni w ^I a s� W IN ;€ 0 7 e G i5 rc §;6 mB $o Sao�n�aS 5uuaau!fiug jo 7uawpoda4 ¢do¢ S7X31 SllVl34 CRJVGNV1S "M3AI2i4 n N M of€o Ssa�}:xdo dll�Ift IlSINHO S(1da0� IIS�aHO snd800 do U10 _ m rJNIi�33NIrJN3a z NV92111 --- V43WVlV Ol 83ldVIS I g \T' 3nN3AV NO1Sltld woudiaos3a Ae 3iw 'ox NOI— NO.I.3a •e 3— 'ox xosu3o Z o w O �w> W ! , - -o .; gm ' s o v " - a � �"gym b I o C s� e TXQ (sv3ne 3aYL9>' 3�NM t.4 g �R d 3 ms ' wt x I � 3 e� o (� a IN ' M (s) I a I yMG 30Ytl �gg a ik 00 3 ea 7 0 L V 5 cool 3dO15 3— 1x.13 l'AI � 8 sn � 16 V , (5) 3d0E I I (s) Tlllll 11-1 to ................ was aaei S,VX-71 i- ONIU33NION3 C-4 V03AVIV 01 S31dVIS Jo Alli 3n3AV NOISIVU 2A I , av, � xl, is w-amh n C4 I 630w."MZS VX31 17 ja 17 55CLE 0 JW 1 C4 X ONM99MM9 a98HJ VGBV4V-IV 01 SBIdVIS s,n cj�j c,,j ............................. . ......... 3nN3AV NOISIVU pop VAR, not, 1 KEY A Son is! ho ST PUT-- WAII lip ON' How SH WJ list? j"! j nip', Qj� WIT W it's 041 11077 -list 0 VIA n n 0 j W, Or wlo VIP Ali v. Ar it 1112 "1 j j CIO I �J H J, Sr Nvumn 11111103 vagiNviv 01 SBIdVIS S'VX.31 ONIH99NION9 IftQc J 0 Al J 3nN3AV NOISIVU 71 MWS V x s r/xjl ONIH33NION3oN LO Nvumn va3V4VIV 01 S31dV13 Ift -10 3nN3AV NOISIVU "IV is saowaS 5uuaauibu3}o ;uawpodap S�IV13a ab'd4Nb'1S �N o:z?oi"o°rya s; s SV'X31 >rVM341S CINV 21311np '82ino w JNI833NIrJN3IISINHO S(1daoo }o ,1113 lLS18HO sndNO0 3o ALIO , 0 ° = mvuu 1 —— V03WVIV 01 S33dV1S 3nN3AV NOIS3VU y o°mow oo� g�E`s�°x � o� w o�N� ;� C �y y a�wi n p z'�°-F'x z'UN °€o €� ='e w > € w goo z G ��_ _ _ .�Vz-tmNaa jg<< �aF= v �o=a pwam a tiau„ vow g€;��>4w 08 w r a -� = w g §� a °�3 2.6 " ALL=ywa� � � mo o s �o .<. Q 5 �` �8 f =aom zaoz mwzR -o ® m oEl ._��b= mai §x„ 000 _ w � � _ N �nBe m„ - Sao°= 0. 11 F � in ° �mm .1 Bs g '"=5=�_0 ° .v y ass . � _ dem°` iso « € a "__$ « IM m° m� r (?.N 339) z i I it r .z > mmsn w Q W I _ ,7 y MIN"-�M m g w e$ z 6o I I.E J ° 1-1 o ��gFQ � I T I�� ra _?.m .�� — �<t _ z W °m Twp ° L m ��w I .} m a° T I a= No3 'z � � sf I O rl ad m 0 F?� J:.N= r.... g m j. o e� 8�4 O] 6W �� t 81 Y C06 .. O W woe p 1�z °so YI NWp�by o GS �faw F tlFJ g 9z g 'w z pz. j •. a �Qi ° M V = _ O —C Z a YK lz 1 .e J_ .z ■vw .._>taw Q NI w I (wsn) 'Nw w ¢.' ..p.: W v �p Ct N xalas.s 6 5 J _ a 0 _ a=o W O E. 8z L z • V � OO z o� \ Z � � � III �3 z cc R. z/1 _ S. _ z FIE =iNa 8p 9 O 0 9 = _ p ERu° 2LL ny � Ho W - v W H8x9 ego a O _ _ n wm :::::: J7 //\ �d4 Z z 3sea... G N8 13 Q m = M F w I ci r O C �° �� =yw O g" ° a v N�¢ FF a w= a ° Z.z >. k B` �I c J .z d m F s wryw � � 4g N2 i0 mw z� 1 a�aPjw V � W8 0aaf , aw . s .° �_' I 7 7 .9 (l0 50 9loz) o (�ma!ds)esleivexi saalnjas 6uuaau!6u3 ;o avaw;iodap STV130 MMINV1S SV'X31 1N3W3AVd 31380N00 ^$ n m IIS18HO snd2{00 }o Am usiaHa sndapa Jo uia V NVUHn ONIa33NION3 �I V031NVIV Ol 831dV1S Ift$m � 3nN3AV NOIS3VU No11dIMJ530 AB 31tl0 'oN-ET N—I... AB 31tl0 'oN NOISIA3M 653NNoa�1 1N3W3�tld�1 ,Y/1-,B/l a SS3NNOIHL 1N3W3ntld�1°. S.Z „n °Q�w -j - I O I s waw ;rl ea - y° _ UH HA M.DINL 3N3W3ntld 1 ti a z ;�4 mtSgi 55 N"K A3W3nYd 1 ti e P € aQ a Ng Yn-sn 2 Yn-.an 412 2 & � o: O 30 =o€l ss > > ^o :' H: 9WHs� ffi O ES -n Rk .N/r 1 U g$g MH �_ � - -'€ W dSIN ;51 W Mo x. g ci § & a3 vo. x.. W S31MM u 'ONW m :SLS j � ^ LL s3I"nn x a € .oX Q s NiW X .9 to a g ti x€W, R ZIZ v WOR mg iii �W � o f. v J ry� S31NYn ` ,A as a UWn g Moo iuv�assaoinaaS 6uuaaui6ud )o }uaw;aoda(j m °tm°"�"��° SVX31 SNV-ld 1081N00 OlddVlil � !DNIU33NION3 Il SINHO sndaon So .Ills . mvuun �iip 'd' V03wVIV Ol S3IdV1S o �'°' Ift S1N3W3AOHdWl 3nN3AV NOlSIVd N w NO-1— 77 -ISIAIN Wlidl-- AE DN NDISIAIN 771 - 3a o 03 pVo�z ¢ O� N r Jw3�0 ¢zvii�vi¢p¢ \l ww¢Xoom�¢V= win Q w x o� - - ow �o Q oZ �j .o co r7 M m n S 4 ® W w w Li 0] W B 3 _ LJ w �O � � W v LL W � Li U �E �. W U � •• � - Q m N 5 0 _ W y � � G , w o w W w 0 � - a m O M w m 4W✓ul rvo,.°x38310N QNB/ ip SVX31 S31EIV1 IVNOISN3WIO ONIH33NION3 IISI8HO sndaoi So 1115 NVId l UNOO 133Va1_ a Nin jg �Ilp tl43Wtlltl Ol S31dtl1SI o & Ift S1N3W3AOHdWl 3nN3AV NO1SltlE! H w o a Vl o a�F��ry=� n � _ - II � �• •� � _ g0 30 _ ogrcL � + R s — I a Aa 0 0 o' o' ¢w Wl H \I H I all _ Fo Ba x � zp Be Z p - o 30 InB 15 go w N z o boa 04 - z o0 oLL ®< w a a «a _ o wo€ oa « o o a<= a w saglnaas 6uu0001603 }o }oaw;,odaQ t0 Z�- n zL/mw No 40L 4N Wtl�y I1S121HO Snd210i )o lll� (4-0 dOl lOki1NOO O LIVdl (US lOOX o z I NoSanH 1 Rvaanw JNI»33NION3 i A9 03L0313S SVM ONV -■ � � �..o ti _,.Ho SIHl al 3 v,V,vd ■- u� WAHVIV Ol S3-IdV.LS j SI 133HS OifV.N SIHl R o I�`7-089dR6iS S1N3W3AOddWl 3nN3AV NOlSIVEI N w NO-1— 1. ON NDISIAIN NDlidl z N g z-i. a �. as ° `�� € �€ '28' apes °CCL 0 m 0 tA P� o • ag & o M'" EEv€"8W�`fi �°� - - $p .5. � LL4> o2 ti p z a Ai W ' We° €p gotta H - a�agm a ° �I,oFi �V:A zaN n Mbou F� F€`.£•`sw °�.`.'_=$&a��,'-'�.- be 7!y c ua u H ,211 aPods yuoM m ,21l y , x x % % ......................................... ® .�.............................................. UeJ •sr.. .....r..I zQ c5oJ apt-1 O h ¢aw wap26 K36 JJU � v .°{pr. ua Np-o= a aPotlS xuOM 9 , % % •xtl z. ry i i /1. la01 noU5 { Y. �aP Irvo45 II.IJ 0 ILLJ G ' a u LdlaalpPNs I.Pl—s z uow os O axo ssel am os i ocz67 .17 � ZS ua�m $ ao ua ! i 8tlulty� eab�o aP� biryaso�p�a 'n �uio a P�npuoys s� uaps �31tl0' Fun b°Fiuo»oMFory ,a°tl»laoo.+tlaa+Lu»u 6tl3yxo el.>Yy�Rp o>u atl�uo�J yWoaxs Rtl BPdo>SnP>uYl j u sl p c,ux �tl3NItllJ51a saglnaa5 6uuaaui6u� �o }uaw;11411 m SVX31 80 - (N30) dWS - NEJIS OIS IOOX1 ^ w 'cl/ol/a No IISINHS sndaoo !o .uo ad'11/01 3Rvaanw JNIf�33NIJN3 i 4 aMoM3S S M ONV -■ � �.o w h 103108d SIH O1 3l9YD1— ■- u�' V431NV1V Ol $31dV1$ o o Ift SI 133HS OWO.V SIHlW h z IRn7 mvmwr S1N3W3AOHcW41 3nN3AV NOlS1VEI h w NO-1— 1. 1— ON NDISIAIN NDIU-3— A. NDISIAIN N -iQ ri s wN 4 - a ..N ` "jag z owi o Its ~ d wd°� a� m mSffi a px. ` o b _ a h J of.26 Z j ow q C w LLI Fli o rho 3 r m �p o €v =w �~ 4 8tx € UZOv ., ffie x E t ��$ O uok r - `va o E m c p1Eroo - � " � a��R gdk�d do+8 ms + ao j '�_� •-� _ �� a 111.4 -�.k.r-`n° .o a o F R V1 m yE W ¢ r° •v o �rr G °'t m Y r a _pp c mQ C kffi 4 ti w¢ z w o w� + z + wok N IW/1 �E aj- O Of C) 0 a d a ),l/ a ms :V:)) Iit r; Pso u ryo' N d a o Li $ o YLLJ __ o m ° LU - - op - �S w f - � = a o s tY x +k o Li Li O x _ 1IpII �`I U ° 8 x � > CL t N r x_+ Asa- o N F 96 2 _ << :a Low _ `5m 65 F°3Eovv m� V)" ag'v - ffiAffio d yaw �No - vl _ ,, €=•._ Ni>" Q g� oa`m Z cr a2. za._ mmg� '8 +6.F w oLO � o �asvi a«-�.•`. ma 3 N �u�G� 's�ncpa w_ ink 8- :3113 a}l wo�b pul}Inse� ---P s4Io1p1 sppw slly{bo 1111 31U ° ay;fob F;I Ilql auoase�o so 100x1 aos;pyx a dol 1001 Fq:,111 pules pRupu;1 R;up;�pa pry '„;pp all}plbda0u l�alulBu3 aq[el„ay;Rq OaulanpBua!Plppup;e aly}dp can ey1 �tl3WIYl35I0 saglnaa5 6uuaaui6u� �o }uaw;aodao t0 SVX31 80 - (4-d13S) dWS - NLJIS a1S 104X1 ^ w cl/ol/a No IISINHO sndaoo Jo .uo ad'110nH 3Fvaanw JNI»33 NI`J N3 i 4 031O313S S M ONV -■ � II h 103fO8d SIH 01 3l0VDn— ■- Ru�� WAHVIV Ol S31dV1S o Ift SI 133HS OH C.N SIHlW R z lRn7 mvmwr S1N3W3A0HdWl 3nN3AV NO1SIVEI h w NO-- 1. 1— ON NDISIAIN NOlid-SK DN NDISIAIN w .0 In N N Oj g a Q cn = .. 1 o ~In w n €xt= FEW o�� �� o N 3 o d �a ° 6a mom N g 6 g x -t g;m m� ;v Y CL 0 . a m m =g _ d'� 8a mm8 - ' 8 °oLnPa a$ 6 x�� J E m d o mE�" x�>R8 �0 6'o ti Z - �z In to a - 2ri 2- rh an _ m `er'ee It vat -m�` ek,ug frS�ogamtm�E o#s" 6 a�sa�e���m �g��°- os�au��e�oa$a T$flEa�aaoe no fiL aovs�E» $�=€d��� s�6Wm�§`maa5 Ras f+% aa- ^ooE amF_e000N.oednm =�s mmtm=o_ a mvV s�wb.... mm dro`sb� F B"F°ifBF Affi - In L L �� g �gQ�'aa�ase�� ^ LLJ w >+L+Ln as{- �aa�.er°�m_s.. �d+33EE° O b a b 6 n o o mb v o}f v•—t v w W O O C b N •�_LL�D_�pp L q m o o cg'w � E�a ar mmo—Lo E + Lli Z O®®o}Nig a+ O �IP`a [' b o t x w >L�v I mL•ra-� z 1 a x L~L L -1+0 0 q ° x v? O\> y o z + O W Lb i--4 h 4 VN m+ O L O—•—tG qq G L a U N S @ SZV x m -eem �d�ed�z� s`k 3113 a}I wl&But}mall ae owop 11 1411111 1p1411 p�opuo}s sly1 to 11 1 31U ° ay;hod F;I llglauoase�o so 100x1 aos;oyx a dol 100 1 Fq apo.sI puIH p Ruou;o R;up;�pa oN %111--1—lda 8111111013 aq[el„ay;Rq paulanoBua{plppuo;e ajq;dp can ey1 �tl3WIYl33I0 sagln�as 6uuaaui6u� �o }uaw;�odaQ m SVX31 80 - (Z-dllS) ONS - NEMS 018 104X1 w "Ll/OL/4 NO Il SIaHO sndaon !o .11l� z as N1/01 .�Fvaanw JNIf�33NIJN3 z 4 0MoM S SVM ONV -■ � �...o w h ID31O8d SIH1 O1 3leVD— ■- µ�Ift , tl43Wtlltl 01 S3ldtl1S o f 51 133N5SI O nom. S1N3W3AOlidW1 3f1N3Atl NOlSltlfi � LA or ' C.D Ln N _ In W °' g�a@'« �o V• CO N l Nyd o€oo t9 oy� +. a at`c o ao °:" a m Z Q N N - o.e a a to Q �33mm �w � 65ob= os = ego-6�s $waaa $ — — am �� $ 10+p InBaN SBU Iu.nM — � m lZ l � o= +°s°gm x � a°. II r : — o� � � 6 -- ®9 61 Ix+ $pHs a tis z Ld I. IL ° Q o _ d > a r x � W aax oto= go sg 6 r 1 � me _ a � ( I 1--------------- --- ------- Z ---- bg 9m x 1 i r o ¢ � F e z .n x x + l 8- i i J 3113 a}l I—", —"pul}Inaa1 ea pwpp�o s{loap1}oe�1ooul�o}�o a}ow�ob fey{o o}p�ppup}e slyl bo 11 1 �31V0 ° ay;fob F;I Ilgl auoase�o ap 100x1 aoa;pyx a �ql 100x1 Fq app.sI pujH pRupu lq R;up;�pa pry '„;pp aq�}ppbda0u l�aeu iBu3 aq[el„ay+Rq paulangB°a{plpp ,ajq+dp can ey1 :N3WIVIDSIO saglnaa5 6uuaaui6u� �o }uaw;aodat] SVX31 80 - (E-dllS) aWS - NEMS 018 S1OOX1 ^ w oSanHa No IISINHS sndaon !� .11l� z ad NosOnH3 Flaanw JNIf�33NIJN3 i A9 O3LO3135 StlM ON1 -■ � �...o w h 103108d SIH O1 31-1dd1 ■- u�' V43WVlV Ol S3ldVlS o SI 133HS ONION SIHlW h z lRn7 mvmwr SlN3W3AOHcW41 3nN3AV NO1SlVFi h w NO-1— 77 777 ON NDISIAIN NDlidl-- DN NDISIAIN Ld so a v «v s - -� o a �O Kd'a J N N l w w WtoW 1 � �o s N e loot q m}oma N €maeg _ ti o w< J °m 6a moam N Nyd o€�o t PEW ° ne-gN V) o ' ao".. .... os=€aw a a a cn N z m�a�=n§°�agS� g�+`t - S — _ .1!o aB gF o a Fz _ - ti z � raEo-�:s� as $asaox.as�m "a _ a z 7 - 7 & Rip}pinBaa BUIu.oM x o , I I - lal _ �.A 5 e« Az a: o � J"ta"k nssaa - a l F lcNg., a goT_ �y Ea os am za„ a i LV s €w °€ T, N _ < m 1 a = w Q Lm 3 to .t2 = o E� i o W :3113 III-"l p"b pulIll sp1 e°pwpp'o s{Ioap1{oe�1ooul s1-4 fey{o o{p�ppup{e sly1 bo vola :3110 ° ay;fob F;I Ilgl auo0ae�o so 100x1 —Ipyx a fob 100 1 Fq ap1.sl pules p Rupu bo R;u°;Rpa IN '„}pp apt-11a Iu11 !M ap[el„ay}Rq pau;anpBuaj p.opu°;e aly}dp can ey1 �tl3W11135I0 sagln�as 6uuaaui6u� �o }uaw;aodaQ m SVX31 £L-(L)OS 34VOIdUVB 018 104X1 a "Ll/OL/4 NOIISI8HO sndaoo So .u/j z ad NosanH.�>,vaanw JNIi�33NI`JN3 - z l MHS G3 5 SVM SIH h 10—d SIHI Ol 31avonddV ■- �u W tl43Wtlltl Ol $31dtl1$ 5 1 J33H5o 0 nom. Ift S1N3W3AOlidW1 3f1N3Atl NOlS1Vfi � NDlidl—G AG DN NDISI— N 5 La a . <�La to c+ y taiLa Z CC GO L a m w Q Z Enwd com tJ 6 Gva-mom _m a O OL YD N - II- j r 00•�U� 3w.a U g `7 m - F J b L -D +N U D n J O U U DGpa 0. n 0_00- N+ a 0 1.c an > O z 2 } v W 0 U N +y 00n aD•- W 2 [L W DD O] Y H O a Y I O.Y a 1.0 Q O U g w V Vo +°mov ai -3co N ryN G E_ J d d Z Z OA-CE -I vim: oP� �Jo ow N r H ¢ H O In lo Q L�000-N voallo °cn pu x z W p�ENap O+�U +Ov W I- Z a i Z w Q `aLb�Y Io mni� N or• oo w mcmawa Ao-+# i-a s a 6 u o F x a•-t E T O � O vt 0: Y OV-C Q Sl C a L W O O + L O '- O111.10 + '~mC a oanLaLb L - - G Ua•_ D EU O a C y O v_a O_ p .__ a -P -a d ai- ND OOw E C O wn�. O OL +L Y+JC a U Z N-c D O - �+atL am D+a 000+- Oc N O Q C O N•�� } Yah «ar a.yFUO� D Lh Om D OV CN OC aU�AyjL Ma U a 03 W LUG O m w U O N N J t c O O 2 P N pp W O U N L U 6 G C GPC- d t a a $C tO m m VI D U •-w a`�- O N Cp m 0 P O X C N caJ O U Llu3 V-Y+ �P C>�� mL LSC+-h.� E'�- +° +L +D G L YJ m o>m -- •-oo c"- a u v� o c•--o�0 0 0 o•- N mooan oEL am0+ O•�E oi- mo 'Ubt E +n c OL L L OL COO LU' amaX m -.- z0 t0 O 1 1 0 W m h O a L 6 W L+L+X CD h-D C _# U C Y Y tl C C Y D n ti p+ B I. + I O L a 0 C a L a w o—N O aml O O-O S ULU + + N m 0...L c O E O L O N O N L;O O t. U O - 3 G ^•60,00 O L- Dl+ J 66 aw-+UNZ m ++A•- +a aN#$U L + oD +O [+ ONc+ L•- O+ C+ •- +A+vo c c.o °oma L®°iv' a� mu P•E 3:u�am c•Eo maw cc�° o °o cPw= mp•- ._ +La •-Pa anJbaa wa o 4a L a O O PUO b+O +G O G L O C a 0+L � •-O - a N m h m ce -n+o:v P omn a+e w �m L mcpc Poom�o m o- z . r. c+ # -Op n Lc a -L Q VI�+- m o U a014 -L•- 7E L �m aCs N C o. ...a baa V10L]tZ +_ L Ut-O -F# p om +vma•_ Vf +GAT. PGL acv ~ 0 C C_L E a Q w O N N U -c 3 C E-V+ D m L C c•- D OL N G Z G # otiNn L 6 k m CUY O i- ._ Y L+C'-' +O C a0 p a ZUOw t ++ O a0 L m m p a C C+a O §N m O N a+ U M1_ m C a C- pb4- a aaD LAO O•- - L w O.- SO. atnU • tlni-C OU .- U-L In O E a c L P C a O 0 4 3 L A•-C.. •- Z A•-�O P Z® N •- O - - o s U D a> w E L- OA o P o L G +cob a b o o a o D -O p v L w T m o a s +c c II L c o v+p o-o cF G c 9LL# -c am-t -vD +I,o- .. ...L co as oao ... •-o Tcc ..a>ommra Ap O E•- C n GV- OPi•- - U P.G G LO L- Y#�OLx Y D Y I - U'+-a - C•_ a-6 •-.-tl U#-L cDNom + 9�0 J•-mp 2 D - _ t0 O O+ P > >0 0 CFP mp p m L m a W O L-O O N W-+J COC* 0°CP a m i # C } pm C +m a Ot C �W atl6 QO n O+xhOC L LY tic W O i-EBS Cm O.]L °v]O am+0�6 Q0 V- O ClW Vi c A c'm "m L m o m N+ -_ U P +L 6 U P C O O L O C c+ U o U ¢ -m tt a- �O+ A a v•- O -- pry UPO ppE L•- a O ._G I NL U U+LN .O#mmPA aL O� -Eb L + O+ V O O G T'�-+ O O O+ •_ G a v+a 4I E•_ m C OZ 3 O D N O U x O I O O C m 4- C+ �D a P w p •- n O P 4- N•- U C#a T L -a O E O •- cQ�tl{ L+C TmG -- x No3+aw T m �p CO - 2 O- C ti O U a P•- O 0 0+ - 3 P -.O L- t-9)O V O In C ._- O�O- C h v+p a- .16 0 E O+- Q V Ey +ON +O-E "c +w O•-L+N Lm CST++O ha+ mNZ m-c0 N - D G G J O°3 N P a Z O O N N O L O O - U U E E O•- O C O N a OO G Nm O D O a•-.0 m2 O^^N U00:v! (} a a 03t - C] V-•- O + T CL+ GO O+O �+- NO+_ Op C A Q - Q LOO+OVg OOQ+OND Dh m90N �A 3U E+ E 6 } 00 H IINc NC O-O OOA U.-,_L O DUN+N waw -6 NO Oma•- m U C4.- La O -U-P N C N D- m D m- +N O La l..-a-¢- ':S w '.2 "_p - 3 O 00- Gw O - - a•- U+LO 4: a ryry am apo aGa OAmp.m LLaZ�•�aUa��L1 a> -O+ppO a O '�O-Z'+ aaa>�� OmP I +O9rN EE Da O+ caaOQQ 34.aDO CDE D aUlcd m0 a+U 0E ODU w N =to GELD O - un�I Bugilnsa.r saewop.. ossa god� .+op� 01 slug do 13314 8- uo{m4anuo5Nau {auWsa4 a 1LOOa1� ��00�1 F a{ u{N 131 VO Fuo do.(yuB»D.x�ory F„4>V SR,t 4d Bu;88ugBu3 So a1..aVi!.p 6au+aOB9,OmpuoFa ,4F) a' a3rviviasra - saainaas 6uuaauibud {o }uaua;aoda� m SVX31 SL-(Z)08 34VOIUHVB 01S 104X1 cl/ol/a No 0 IISINHO sndaon !o .11lj Ift as NosanN.A RVaanw rJNIi�33NIrJN3 A6 oaoM S S.oNtl ���� 1D'I A3 SMO o0 3l SIHddtl V43WVlV Ol S31dV1S o 51 133N5 oiltloNV15 SIHl a ad Nv S1N3W3A0HdW1 3nN3AV NO1Sltld H w Z Q W V ur m a EI GWi °�x a M Leh Pi �c 4 €» 9 x IN 4= p o� 42! "' —u g—Fc = §�... e [�T3ao uo ♦ � �m — ,la 5 4u x5N � �d, 4°g a« &Sv�h �N� Ehfs c �X vo 5aa �z'� o R .g V,... _ ,.c � 4� ' axoua 5 a X* g E O8 4: ° 4 sX gy xi- xil e * a d 05 X- E �w hP u W Q -' of 2-- i * 4 o a 5b._,z b E - 8 $ w �o 1,38 o €as5 �g ?. g< SNE o & oma - $g a u�Pcdanwao mar o RiAll®i'auotlsax e s ppxl r�a�aoarrnW asa'1 rW Rub mi4i1tlOx4 pulx R ba Ryupa.adx'yaN " .i +d[ruluou,,i6u3 a al.ahy ba Raurana&ra!GdoGwis i J _ atl3Nis'I�510 Sa?InaaS buuaaur6u3 }o }uaw}aodao m SVX31 £L-(£)08 30VOIHHVB OIS lOOXl usanH No I1SIaH� sndbon !o N3 .11l� .Nr rJ 3'd NOS4f1H'J A—.n. rJNIi�33NI �-- i A3 a3SIHI 0 SM on Haman 1J31'Otld S O O1 3l SIHddtl ■- µiV� V43WV1V Ol S31dd1S o 51 133NS Qi1tlQNYLS SIHl V a a11VI30 (18WINVIS S1N3W3AOHdW1 3nN3AV NOIS1VH H w�0 Cr � W W m G r fi N ry p88 �. p� -'Q0 ` < I y '!Z 0 `s' E - ~+ - 2 E V) p m + L L 6a �€ Dov C WU s 9 ' a EE w Zt N =iVL x,o °Lo �` ee °a o0 0 r.4 o..cthe c F E E ° orv� aL 135 fi e ❑ /� v ♦W V d a O an Q O °° .. 'rJ c o O c 0.- g w�"�j.., W �� c �.Y o� ) D x.V z vh "� w w o '11,6 v_o <muow n; Q cgg U -ty., L Q) �— L 9 �a U U o U � —� O — Q ° tll JL 60 o U L - ,r ® cfE a c w =0 :;°, o y o w vYo M "` a deo ode "s_ ^E rot 4 � w w EKY+ ga ii z- m - e 8x - 6 Wac� p8_° gam°' °,n1O a ud y 6u!;las3,a ss6bmP✓P s rasa, aa;�n s }ds4ib n+a PP�Y+Fs siu +a rKNj •'a""�u:'�of z+�¢svrauoasa��,xavrexo i�xa+`�N'"rbso yaw aeau���w.,oa xaaxy Ra a��i mb�x *aaYa Kuobs+a+K4ubasbM aN .+ rd�'l+ssW'•ibb3 bxsl..sed+Kd Psudana®s�P+abub+s s,i E,. a rtl3WIY IJ51tl saainaas 6uuaauibud {o }uaud;aoda� m SVX31 £L-(IF)08 30VOIdUVB 018 lOOXl No 0 IISINHO sndaon !o .11lj Ift as NosanN.A Avaanw rJNIi�33NIrJN3 A6 oaoM3S S.ONtl ���� 1D'I A3 SMO 00 39 SIHddtl V43WVlV Ol S31dV1S o 51 133N5 QiltlaNrlS SIHl a ad Nv S1N3W3AOHdW1 3nN3AV NOlSltld H w a, it 0t AR E a" " ry a yl M n s $nf k e .k s s $ s ,s"_W =o� ) is =$ e N sig ss a A; a � � e t � � - 's �> oa 91 - 8E 'Ra a otr Q e Mt° fro6. 2 oa ° s m x :-fr s .s $ a "s ox s' sx }a x fie g- xs s - a-- t s s e W =sg s " s ( s t€ k g'a fr es ss xa�5 s sss s x p" xo g gad x x ' 0g �x"® ek €o � �a $ € x t x .k���x goo U fr Axa x ga° 2 $Ef 9"° g jtg� a s g?5t xx a s frfr de g frhx fr g- - g g°k n k: ass x g e A ave a -'g ,sm s aao o Ag E.g: axxx k ° � a g° 5 8 6- @m" gg w �q� S x $k g, 5 � frs � 5 a.- �a o':.& a _ €sEx gfrxa� ° s�J$g s x €ovxg ° '�o og wa g'" a frx fr s ) g. x agAx s " " a " 4 �' ssg � vm g a c.�F b d'xEo g'oti sd"s s�k 9 s� It .6 : .�s."x.�°kagWa`oe= 6s �"kk� 'mdfras?_ ag�=eN.��� 2,W - u a sg8 =fra gat° °hh � €°�y W .2s 'a ssasx s shk ° ar dry' P�€xg€jPik figb'•'•{E va E As �e. w g a Ar" xx k x x" 5f d!oil o Af. fag & p o vagaao - g °gfrP gg sx!and a4si°em saeowoo a a,!,oil- .ted� .,004°+s a +do ,sera pit w,aa"41 i°d Ai!I!p!auWw d §1°4W as end Su°�ad+ltltlkl Rq a6ow v ,N Ruoad°Aft4u°44on°N ,our a.+_.a°4d Duai�ua�0-I u3 s-ad.��4�b�O—1 a a0+s.-u°!e .41 d°a e4LWY - tN3W!r9J5Id - Sa?InaaS buuaau!5u3 }o }uaw}aodao m SVX31 €4-(5)08 30VOlU VB 018 lOOXl ^ �_ 'usanH No I1SIaH� sndbon !o N3 .11l� .Nr rJ 3'd NOSof1H'J A—.n. rJNIi�33NI �-- i A3 a3SIHI 0$tlM on Haman 1o31'Otld S O O1 3l SIHddtl ■- µiV� V43WV1V Ol S31dd1S o 51 133N5 tliltltlNYLS SIHl V a a11VI30 (18WINVIS S1N3W3AOHdW1 3nN3AV NOIS1VH H azo', a � _ € ya mea sg €a a 3' zgx O•^ hgx to .'g -��, 5'� 4uJ 5. � aaax xx i mx s m mC app x t x €- A i �F w F � � 9tA _ ry kg- � ..€N s Ne" e.& W - is 0 P� 9 ... ................ $ xa � m - w a - n� z " . o x a n- 0. � F o n x b9 V) �ry .Z/l oZ ..Ib y x s z I 1..2/t 1 �_ xs Maxx m M LU LU b o PIZ uj it c7 F w mf E x. Q K a D CLs o L1 S w �v 5� F W F Z ry = — tj 'gH - b oxo �xBbYS. & Y m cda e rc+a.+.uo�eui':�ba x�.i i3a!auaaa�a+a,<kw,.ca'yo of ,w'T.o!,osas°m+:m x'vu aas'yagxu xc ai°m a *ayYa Rx+b i Xe'ub+aWx oN .4 Y .m +d au!+aauYau3 bl.aaa R4 Pau+bnba s!p+bpWpk s) kn eyy p' a' a�u3Wl YytlSltl saainaas 6uuaaulbud {o }uaua;aoda� m SVX31 E4-MOG 3(3V0IHHVG d1S MM N 'Gl/Ot/4 NO 11318HO sndaoo !o .111j No as sanH3 Kvaanw rJNIi�33NIrJN3 A6 3L3135tlM ONtl Mal � V - o w 13fOed0SIH1� SUS3.,ov,lddtl µ°� "' 43WVlV Ol S3ldV1S o 'I A3HS OWG.LS SIHI a 08V(INV.LS S1N3W3AOHdW1 3nN3AV NOlSltld H w w a x W p �.'.fg x x X xaG J~KM aAa wFu �aq h cn P � e uxv W W O Q 3 0 oo x k m A x x w Z R5 $ ffi a Q- > E g gg' g p tgj c g a a x w g s}k�°' P5 0 D " (yj j O LLQ 4Jo dJ ag ogs6§5 022 �0 P p F g"kls--2 W�mfi' W N x o r a 6.� LL % A 4�s Jnu Qp $ g Vi 3gw k S b m a — C:1� � a pt6g v LL s $ > 6 GS p a N 6 k ea CL o w €7 `�< - �d w _ P xS2ll.-I]L IIS a a P-"-; # i - a s a klzase�ha -.l k s a aPn `, ak$ a $' Qas �g is aka w�lg �� 91i R ko uEQ 2� s $� xo k yl "sad �koskk $ss= »€$ �a� '•d m >s-�a= $ Wwxx�.- s� s § axe & eesd >e$ sJ o �o £� p g $ ~ $suss s m s W6 m o� s sF sksek xssa�s � �� sE�m § a ss$ $g' qs ��e€ee$. s o " �y, .s M"t—M x� n. $k a v��s wig l�__ w •..n s,..P+b 6P:8 n. Pu:an,rn®,.� PPPPA.9:�,,. - �x+.woo W1.nod Rye,qY's� l0e 1 FrnM o§�.anm K �y gar 4 s:P +31 qd Run bo Keuo++ox.oN .ioq ,x tl Cu;+oPu;6u3 o ml..aL A9 Pa++ano&s,P P y i J q _ sn WL _ a PB3%Igl3Sid saglnaa5 6uuaaur6u3 }o ;uaw}aodao m SVX31 n zl�mw No0 IIS18H� snddoo !o Alii 34VO1lid`d8 (US 104X1 0 rJNIa33NIrJN3 c 3'1 NosaaH'J AtlLNaW XS 03L ,,,.,,.,..,,.., i MM 1JS O al 3laS Sl n3 Nvuun V43WVIV Ol S3ldV1S 3 13HS Oif01NV1nIHI n. allVJ30 (18VONVIS S1N3W3AOHdW1 3nN3AV NOlSIVII H NO-1 3— ON NDISIAIN NOlid-SIG 1. z u mg H 5 • ra E 'mac - E y!J~µ„ M ui _ w_ m °& Hsi G�3cc Cjz F �- - x s._ _ • • A a P cc •�•o• 011; z Bo° g�aeN xe 70 x9# x =E s 9 x sa#" xV. 8F s�z =mo -J g #E jet x s xo baa o • . a ha mom x •° h axsxx x sex a # a't"- r Y r • Y z st XF FS - rn its a s sg Kong i s h r m � 1.� : "x # <t €h ami 1 i#Y gs 'EJ LLJ -10 he V SEF aw mP E_ B � &.LL m g LLJ a � h�� h�sfr �fr x � ��- •- � VEEP-: $x s §$u# n theg a$ A ' o - 2 # xxh h z a4 x - s k®#2sg9P b a h a h o '` x x �: :� xx# ss-V x x m x e x x" as s s° # h a six# h e a h yr ab x #x vt; � h xxm ti 1-N 6--61 stt Q a y Fk K UilAg }x # xsQn �xttz h a4 F 4 $ xhax ohx d g ui a awxoo�°aoox sg c>h�...• oa€w^$.. Hca° `~"�=bEf ssl w+o i sola l�ca+saaaoP+ owl+P auw oa P+o.P+Pas slag x axva XUP da XiuP++P».aN X1oY aPlia d b 1 96u3�x d aui X9 pmu.+a a6 sl PmPuoxeas luiXbo - $ti3WIMlJ51$ _ saglnaa5 6uuaaui6u� �o }uaw;aodao m SVX31 £4-(8)OS 34VOIdUV9 018 104X1 w c1/o1/a No IISINHS aNV sndaoo !o .uo ad NosaaH3 ava JNIf�33NIJN3 i 4 aMoM S S M -■ � �..o w h 1a3108d SIH a 31-1— ■- u�' V43WVIV Ol $3ldVl$ o Ift SI n3HS OWO.L SIHlW h z lRn7 mvmwr S1N3W3AOHcW41 3nN3AV NOlSIVEJ h w "Ila E—%A o Cdr !aa x N m w M g " s�a9 Q x:osgm xis € w o XZ N ; m OX s smo �� m fax q� vz I g x xx $ o j-esx A ` =g-§Llu �m $vm 8 f r- EFa L � o0 8 T In A�,g ��c Fi-ail idea a$ $ = s € ?m 8 Y H as € 8 xa �$888pg H`Iffin�.�8�� 8�.9�h MboY o � _ d F o $ 9« 8 8S' ma mt , 8a� 8$�hF fr � hh�fr&&a'xg8&ms �� $ E5 .gib E "a8 oP8 S$ "gym8N s oa s x":I g� a s - x-w@a ;Nsg"x8 s sgMs€ $; frac sa 8 SEE x 5f xg 884 s a 2$n8o =928 67z-fr$ €8 F m. Nmtl "dg� €d BP�b`z. 26 Egi 88 o��h lead a : s $x a �xoa x"g a $s 8, m xm x mdse s � 8x a _a n px m s" s�s5 gfr i ass � � =» da %six a B--is x m s " m� xa gx_ sbax » gxasmss x �$ da abed s m - 5� a m b_gis "� e m s 1$ x89 HIS = gsx x 8o7—Tv axe s v m m9- sad$ $ - "$g s H �$e � a s & s s Bag " x �m" s piea,m€ $s Ell mg �8)$s$ ��� g $ sm€�-x m � €y sxx oM ��� �g-"g $a" E$a�8s 8 ass Baa ssxx$ g a _nl i H 3 .:..e, ' ,3lld 8- �vsanwavaoa.+o. vaur+avai�av�xl i e as auwaa%�ox Wo .tiw�adc aN�„taa ,a ogtl Ou;�aau;Du3 m4..aua x4 mauaano6�apsB mauais t S Y _- a'b3RItll55�a = saainaas 6uuaauibud {o }uaub;aoda� SVX31 E4-(6)J8 30VOI UVEI d18 104X1 'c4/o4/a No 0 IISINHO sndaon !o .11lj as NosanN.A Avaanw rJNIi�33NIrJN3 A6 OaLoa13S StlM ONtl mvuunIft 1D'I A3 SMO 00 3l SIHddtl µ°� "' V43WVlV Ol S3ldV1S o 51 133N8�atlaNV15 SIHl a (18VONVIS S1N3W3AOUdWl 3nN3AV NO1Sltld H w E F E xkgfi wx YS�Eg xg �5g �g-� ugag Argk x .fox E " g=gk alloWt y S°�SLa 8 xE x es9'E ffi IN g,18° " d �ypQ, N� M^g w TagE 8eE gg ffixgE " " " a E xg ° g gaW 'x a s ►arc w e CIO s 4uw gg filo € g xhx EgEga" ° gffiafixs fifi gEg6 g" N g� v z u LL 0" k a Me -nsk .m gi €xSE�� xgsxex$kga gfix gx x � s. xxss gg. e g ° � x s E •� a4 Egk.* P_ t ° k air Ex x gg Wg gg WIN= U._ g� ffi ,- x� sa �•E g ? i lz Fw 241 a s En px `€ v°x5E 5'-'ffi x 88@ w a x xggs s ,k a gg ' s a � »g '-3ffi g �^ a" $ gxk s gs s E° Efi,gs�E� ' ffix " fifi " gE�� ffix��'° W gxfix�o�§fi§a �I �z s k as Eg E E tnt . x .g g fi 6 s " m wNg S'Sx J xffixg xm_g` ° g s g "se o Et d € 8kv E-li4a 7; ja'4f, �iSs F- bv' "•- m s g fi $8� gg ffigx $ eft i °' z " ,k " a m.. xffi�« ffiggffi ffi ffi g8. I' u a FO J _ x €a ��oE � gg $•c x �. � � � fig$ #e � �$��� t Pa �s j fig .A E €� i, fixs a . fi v hg ffi € k.°� g fi gE �x82 1Eg1Bi 8 "'g €$ E P� k v gS24 g Ek $ m e x x ySw$k fix Ek ffi ... yikkx SEms e Ag �r;t& E � EE w jjjE °E E �€ gk x a Ex Sk€fi , gW J glfi.8 n ! " - s x ) vv[7 _ W � ffi�x a — v Y :axle s`= sFl so b aulFl°sad vamouov.+ n 2u Foa.4.+�!ao)g og a F o uo a slt1Y Jo e�ltld u�lsFanropnsaua o .filia4;suoosai o sunBsxFYpbx1 Fop es sM Xuo uau1ro��x�wXop�'nu s!pulY X gro Xavoa�oro'oi ..a a a..opa av;,aav;a,i o aa.a°u Xro ,.a�os'Fa,Fsopvoyv F g - ° aawiriasla = Sa?InaaS buuaaur6u3 }o }uaw}aodao SVX31 8L-(OL)08 30V011 HVB OIS lOOXl 'u/ot/a No rJNIH33NIrJN3 IISI8HO sndboo !o .uo "a 3'd NOStif1H'J AtlLJliW -- i A3 03SoHI0 SM on Haman SIn3 S O 0y 3l SIHddtl ■- µiV� V43WV1V Ol S31dd1S o 51 133NS Ni1tlNNV1S SIHl V a aIIV13G (18WINVIS S1N3W3AOHdW1 3nN3AV NOIS1VH44 H NO-1 3— N— NDlidl—C DN NOISIAIN « s g s €�-o ak k 3k>m o uW La P•. LIs s sg � sa aad "lbs- z ®cg8'�8 _B_«_S E do a -5'"_ a " "a«aN W h,-t s 13 4 S a. $ - fib$ p—s = E Ek a g�9 f o _ " L (D> . I G E aL gg « z Al 0 = gs9x c m a t its 9sm n m syn J8 'sq w x spga " a d T2V§4 aga s u r-y � � 14 ! PIN?, r_ - ks�»�"e�i - a w - v 2 8 H 81- Op mpg $ w AHS 1 KA, :3i B ma++e Bugleuotlsa$aou9wnx n a, +°a r,a wo xau o +P, sol o+YOQxl+ poi+30Nx1 xuo to/u,+uo®pox oN .,+oY .+°o�d bul.iaaul Bu3 soxal,,a4x R9o0au1anod+ap O�opuo+e s,4+)o asn aWy - ey3WIY'1]SIQ -- saainaas 6uuaauibud {o }uaua;aoda� m SVX31 SL-(LL)09 30VOIdU` EI 01S 104X1 No 0 IISINHO sndaon !o .11lj as NosanN.3 Avaanw rJNIi�33NIrJN3 A6 Oa1�a13S StlM ONtl mvuunIft Ln 1D'I A3 SMO 00 31 SIHddtl µ°� "' V43WVlV Ol S3ldV1S o 51 133N5 Qi1tlaNV15 SIHl a (18VONVIS SlN3W3A0HdW1 3nN3AV NO1Sltld H w Z az v n so ° ..r a _ ua w a v a m &,fix$ -g- -Z gx�x � ' m>� s € € _ s gj1 x,g 68 € x se as JCA s xsx xg� ga F W I $<� yr x�ma has �gg�sao •� a a � �� m ��� s awabv ke x s a rvw s wS Ma an m M = a yea $a �x god a °» a gig- ago xwg t2 , '?z it xx tl8 ., a aw a m xa yx gg 8 °� . .� t Y m a x a=5 pax ffi w" w a aME L'.=a a= - o � p -fr _9 Oa: Asko »s ak gfr W u m) e=v a v g_ s ins -95 a q,t 5 as = ' .p � m� �` a w x'das <fi asp w ass <xo sgz Vis:a gag �31p.3 8- )Buai�sa�sabouoo� a .31V0 uoauanuoosa ia)F;14Vlanodsau o oy100x1 i asotluM Kuo.+odJY00u1 K sI�WIY Kw)n Kyubauaox.oN .xaq a,y y bus eeu98u3 sm 1.auy Ky peu�anab 8,O�BOunyk ,ay) _ ��lY3YYIv1�510 sagln�as 6uuaaui6u� �o }uaw;�odaQ SVX31 34VOIHHV9 a1S 104X1 w "Ll/OL/4 NO IISI8HO sndaoo !o .uo ad NosanH3-- JNIf�33NIJN3 z 4 aMoM SVM ONV -■ � �..o w h IIl3road SIH l Ol 319v-- ■- WENVlV Ol S3ldVl$ o Ift SI n3HS OHW.N SIHlW nom. z lRn7 mvmwr S1N3W3AOHcW41 3nN3AV NO1SlVFi NO-1— 1. ON NDISIAIN NDlidl-- AG DN NDISIA] a .'.. ro F °°ui kc o v ° ,—, o a a a a o m UJ `o W fooar . Wui he z "J z w m = — m — 08 Z a w�z� J m� wW ywggq'g � d O J [[ J a A vi ` ,"C' 1 0 1 o x w In ul 04 °n4 � a ° ° VCO W W I I I IW I lol I ; dg 8 o ix g _ diS to u J �31p.3 8- e ea,ai°ea.,saeaaoo ro o. o°naa sa io o�aeyyam ;I'lC:auodsa�° e aosjw�wlasotl�nd at00Y1 Aa°apdu sj°gryy 31V0 of a°,a...............sro. s.ua a oaW,aaoc sa o�o'w°ndas e�w a o a°y - +tl3Wlbl],510 009101 ADDENDUM NUMBER 1 Project: Ralston Avenue Improvements Staples to Alameda Project Number: E16271 Owner: City of Corpus Christi — "? City Designer: Urban Engineering Addendum No. 1 Specification Section: 00 9101 Issue Date: 06/23/2017 Acknowledge receipt of this Addendum in the Bid Acknowledgement Form submitted for this Project. Failure to acknowledge receipt of this addendum in the Bid Acknowledgement Form may render the Bid as non-responsive and serve as the basis for rejecting the Bid. Make the additions, modifications,or deletions to the Contract Documents described in this Approved by: Urban Engineering Murray F. Hudson, P. E. 06/23/2017 Name Date Addendum Items: — ARTICLE 1—BIDDING REQUIREMENTS ARTICLE 1 SECTION 00 2113 INVITATION TO BID )I- MURRAY F INSTRUCTIONS TO BIDDERS—Delete and Add SECTION 00 30 01 BID FORM—Attachment ARTICLE2— MODIFICATIONS TO THE SPECIFICATIONS OR TECHNICAL SPECIFICATIONS.-SECTION 0129 01 Measurement and Basis for Payment— Attachment No.3 ARTICLE 3— MODIFICATIONS TO THE DRAWINGS— Attachment No. 2 ARTICLE 4— CLARIFICATIONS URBAN ENGINEERING � ARTICLE 1—BIDDING REQUIREMENTS 1.01 ACKNOWLEDGE ADDENDA A. Acknowledge receipt of this Addendum in the Bid Acknowledgement Form submitted for this Project. Failure to acknowledge receipt of this addendum in the Bid Acknowledgement � Form may render the Bid as non-responsive and serve as the basis for rejecting the Bid. � AddendumNo. 1 009101-1 Ralston Avenue Improvements IS.Staples ioAlameda Street)—Project No, El6371 Rev 01-13-2016 B. SECTION 00 2113 INVITATION TO BID INSTRUCTIONS TO BIDDERS: DELETE: PARAGRAPH 2.02 IN ITS ENTIRETY The Engineer's Opinion of Probable Construction Cost for the Project is $2,138,000 for Base Bid 1-A'Concrete" and $1,748,000 for Base Bid 2-13 "Asphalt". The Project is to be substantially complete and ready for operation within 210 days. The Project is to be complete and eligible for Final Payment 30 days after the date for Substantial Completion. ADD: PARAGRAPH 2.02 IN ITS ENTIRETY The Engineer's Opinion of Probable Construction Cost for the Project is $2,0108000 for Base Bid 1-A'Concrete" and $1,6198000 for Base Bid 2-13 "Asphalt". The Project is to be substantially complete and ready for operation within 150 days. The Project is to be complete and eligible for Final Payment 30 days after the date for Substantial Completion. C. SECTION 00 30 01 BID FORM: DELETE: SECTION 00 30 01 BID FORM IN IT'S ENTIRETY. ADD: SECTION 00 30 01 BID FORM IN IT'S ENTIRETY-Attachment 1. ARTICLE 2—MODIFICATIONS TO THE SPECIFICATIONS OR TECHNICAL SPECIFICATIONS. 2.01 ADD, DELETE OR REPLACE SPECIFICATION SECTIONS (OR TECHNICAL SPECIFICATIONS) A. Delete the following Specification Sections (or Technical Specifications): DELETE: SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT IN IT'S ENTIRETY. ADD: SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT IN IT'S ENTIRETY—Attachment No.3 ARTICLE 3-MODIFICATIONS TO THE DRAWINGS 3.01 ADD OR DELETE DRAWINGS B. DELETE the following Drawings: Deleted Drawings Sheet 1 of 77 Title Sheet and Plan Index Sheet 2 of 77 General Notes Sheet 4 of 77 Estimated Quantities Sheet 7 of 77 Control Map Sheet 8 of 77 Baseline Information Sheet 12 of 77 Pavement Sections Sheet 13 of 77 Topographic Survey and Demo (1) Sheet 14 of 77 Topographic Survey and Demo (2) Sheet 15 of 77 Topographic Survey and Demo (3) Addendum No. 1 00 9101-2 Ralston Avenue Improvements(S.Staples to Alameda Street)—Project No. E16271 Rev 01-13-2016 Sheet 16 of 77 Drainage Area Map Sheet 17 of 77 Street and Stormwater Plan and Profile (1) Sheet 18 of 77 Street and Stormwater Plan and Profile (2) Sheet 19 of 77 Street and Stormwater Plan and Profile (3) Sheet 20 of 77 Street and Stormwater Plan and Profile (4) Sheet 21 of 77 Street and Stormwater Plan and Profile (5) Sheet 22 of 77 Street and Stormwater Plan and Profile (6) Sheet 26 of 77 Stormwater Laterals (1) Sheet 30 of 77 Water Plan (1) Sheet 31 of 77 Water Plan (2) Sheet 32 of 77 Water Plan (3) Sheet 33 of 77 Water Line Laterals C. ADD the following Drawings: Added Drawings(ATTACHMENT 2) Sheet 1 of 77 Title Sheet and Plan Index Sheet 2 of 77 General Notes Sheet 4 of 77 Estimated Quantities Sheet 7 of 77 Control Map Sheet 8 of 77 Baseline Information Sheet 12 of 77 Pavement Sections Sheet 13 of 77 Topographic Survey and Demo(1) Sheet 14 of 77 Topographic Survey and Demo(2) Sheet 15 of 77 Topographic Survey and Demo(3) Sheet 16 of 77 Drainage Area Map Sheet 17 of 77 Street and Stormwater Plan and Profile (1) Sheet 18 of 77 Street and Stormwater Plan and Profile (2) Sheet 19 of 77 Street and Stormwater Plan and Profile (3) Sheet 20 of 77 Street and Stormwater Plan and Profile (4) Sheet 21 of 77 Street and Stormwater Plan and Profile (5) Sheet 22 of 77 Street and Stormwater Plan and Profile (6) Sheet 26 of 77 Stormwater Laterals(1) Sheet 28 of 77 Pedestrian Curb Ramp Details—Ralston at Swantner Sheet 30 of 77 Water Plan (1) Sheet 31 of 77 Water Plan (2) Sheet 32 of 77 Water Plan (3) Addendum No. 1 00 9101-3 Ralston Avenue Improvements(S.Staples to Alameda Street)—Project No. E16271 Rev 01-13-2016 Sheet 33 of 77 Water Line Laterals ARTICLE 4—CLARIFICATIONS 4.01 CLARIFICATIONS A. Question: Bid Item#A-E6 calls for 35 service connection replacements.There are 54 services shown upon the plans, but only 9 are marked as "Replace Service." Which quantity should we go by for this bid item? Clarification: The quantities for Bid Item A-E6 and B-E6 have been revised as part of this addendum. See included, updated Bid Forms. B. Question: The contract time is the same for both pavement structures in the contract. Concrete will require additional time. Will additional contract days be included with the concrete option? Clarification: No additional construction days will be allowed for the concrete pavement option. C. Question: The bid date is 8 days after the pre-bid meeting.This is not enough time to get back the clarifications from this meeting. Can the bid date be moved ?Or can the meeting be held earlier? Clarification: This project has a critical timeline, so the pre-bid and bid dates cannot be moved. Required clarifications, based on the pre-bid meeting,will be promptly provided through CivCast. D. Question: Can a bidders worksheet be provided for this project? Clarification: A bidders worksheet was posted to CivCast on 6/14/17. E. Question: Item A-11, Utility Coordination has been removed on other City projects. Please clarify what is involved on this item. Clarification: The item for Utility Coordination has been deleted. F. Question: Will the City consider a substitute material for the 8" Recycled Asphalt Pavement (RAP) item? Clarification: An option has been provided to use either RAP material or select backfill material. See revised Bid Form, Section 0129 01 Measurement and Basis for Payment, and Plan Sheets in this addendum (Attachments No. 1,2, & 3). G. Question: The street grades shown on the plan sheets do not meet minimum City criteria.Will the project be built to the grades shown on the P&P sheets? Clarification: The grades shown on the P&P sheets are the grades to be constructed for this project. Addendum No. 1 00 9101-4 Ralston Avenue Improvements(S.Staples to Alameda Street)—Project No. E16271 Rev 01-13-2016 H. Question: Clarify if the storm water manholes should be Type A(as shown on the quantities sheet), or Type C (as shown on the P&P sheets). Clarification: The plan sheets (attachment 2) have been revised to show type A manholes. I. Question: When will the right-of-entry be taken care of? Clarification: If required, acquisition of Right of Entry agreements will coordinated during construction. J. Question: For the waterline deflections, will an additional section of DI pipe on either side of the deflection be required as shown on the City details? If so,this will change the quantities. Clarification: See addendum, no additional DI pipe is required. K. Question: Will the contractor be required to keep the waterline in service when tapping into it for the fire hydrants, or can it be shut down for a while to make the connections? Clarification: Contractor's option,will be addressed in the field at the time of installation, in coordination with city inspector. L. Question: Are new valves and boxes required for the waterline, or only adjusting the boxes to grade? Clarification: Only adjusting boxes to grade new valves/boxes should not be required. M. Question: On sheet 2, Miscellaneous Note 12—clarify what is meant by a "magnetic pipeline survey". Is a specification available? Clarification: See addendum, note has been removed. END OF ADDENDUM NO. 1 Addendum No. 1 00 9101-5 Ralston Avenue Improvements(S.Staples to Alameda Street)—Project No. E16271 Rev 01-13-2016 00 30 01 BID FORM Project Name: Ralston Avenue Improvements-Staples to Alameda Project Number: E16271 Owner: City of Corpus Christi Bidder: OAR: Designer:I Urban Engineering Basis of Bid ItemDESCRIPTION ' UNIT ESTIMATED UNIT PRICE EXTENDED QUANTITY AMOUNT Base Bid -(A) CONCRETE Part A-A-General(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-A1 Mobilization LS 1 A-A2 Bonds& Insurance LS 1 A-A3 Ozone Action Days DAY 3 A-A4 Traffic Control Plan Mobilization/Adjustments LS 1 A-A5 ITraffic Conrol BMPs (Barrels, Cones, Etc) MO 7 A-AClear R.O.W. AC 3 A-A7 SWPPP LS 1 A-A8 Silt Fence LF 500 A-A9 Inlet Protection EA 14 A-A10 ISod SY 2900 A-A11 IDoor Hangers, Printed and Delivered (2 Ea) LS 1 SUBTOTAL PART A-A-GENERAL(Items A-A1 thru A-A11) Part A-B-STREET IMPROVEMENTS (per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-B1 6"Jointed Reinforced Concrete Pavement SY 8160 A-132 Lime Stabilized Subgrade (7.5% by Weight) SY 9170 A-133 12" Compacted Subgrade SY 9170 A-134 HMAC Pavement Transitions SY 90 A-135 Salvage and Remove Existing Pavement SY 7289 A-136 Concrete Driveway SF 14870 A-137 Roadway Excavation SY 7289 A-138 Curb and Gutter Removal LF 5210 A-139 Sidewalk Removal SF 18550 A-1310 Driveway Removal SF 14870 A-B11 Street Sign Assembly 9" Blades and Stop Sign EA 6 A-1312 Other Regulatory Signs EA 1 A-1313 lAllowance for Unanticipated Street Improvements LS 1 $ 20,000..00 SUBTOTAL PART A-B-STREET IMPROVEMENTS(Items A-B1 thru A-1313) ADDENDUM#1 Bid Form ATTACHMENT#1 page 1 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 Page 1 °f 6 Rev 01-13-2016 00 30 01 BID FORM ItemDESCRIPTION ' UNIT ESTIMATED I UNIT PRICE EXTENDED QUANTITY AMOUNT Part A-C-ADA IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-C1 Concrete Sidewalk SF 22706 A-C2 RAP or Select Backfill Under Sidewalk/Driveway SY 3210 A-C3 Sidewalk Retaining Curb LF 100 A-C4 Accessible Ramps SF 1475 A-05 JAIlowance for Unanticipated ADA Improvements LS 1 $ 5,0002 0 SUBTOTAL PART A-C-RTA IMPROVEMENTS(Items A-C1 thru A-05) Part A-D-DRAINAGE IMPROVEMENTS (per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-DI 6" Standard Curb LF 5356 A-D2 5' Curb Inlet EA 13 A-D3 Remove Existing Inlet EA 7 A-D4 Remove Existing Pipe (Up to 24") LF 85 A-D5 Manhole Ring and Cover Adjustment EA 3 A-D6 Storm Manhole (Type 'A') EA 4 A-D7 Tie to Existing Manhole EA 2 A-D8 18" RCP LF 494 A-D9 24" RCP LF 357 A-D10 Trench Safety for Storm Water Pipe LF 851 A-D11 Safety Plan for Manholes and Inlets EA 17 A-D12 Allowance for Unanticipated Drainage Improvements LS 1 $ 10,000..00 SUBTOTAL PART A-D-DRAINAGE IMPROVEMENTS(A-D1 THRU A-D12) Part A-E-WATER IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-E1 Fire Hydrant, Pipe and Fittings (Type 1) EA 3 A-E2 Extend Fire Hydrant Lead, Replace FH EA 2 A-E3 6" D.I.Water Main LF 125 A-E4 6" D.1.450 Bend EA 16 A-E5 Valve Box Adjustment EA 10 A-E6 Service Connection Replacement EA 9 A-E7 Trench Safety for Water Main LF 135 A-E8 Allowance for Unanticipated Water Improvements LS 1 $ 5,000..00 SUBTOTAL PART A-E-WATER IMPROVEMENTS(A-E1 THRU A-E8) ADDENDUM#1 Bid Form ATTACHMENT#1 page 2 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 Page 2°f 6 Rev 01-13-2016 00 30 01 BID FORM ItemDESCRIPTION ' UNIT ESTIMATED UNIT PRICE EXTENDED QUANTITY AMOUNT BID SUMMARY SUBTOTAL PART A-A-GENERAL(Items A-A1 thru A-A11) SUBTOTAL PART A-B-STREET IMPROVEMENTS (Items A-131 thru A-1313) SUBTOTAL PART A-C-ADA IMPROVEMENTS (Items A-C1 thru A-05) SUBTOTAL PART A-D- DRAINAGE IMPROVEMENTS(Items A-D1 thru A-D12) SUBTOTAL PART A-E -WATER IMPROVEMENTS (Items A-E1 thru A-E8) TOTAL PROJECT BASE BID(A)CONCRETE-(PARTS A-A THRU A-E) Contract Times Bidder agrees to reach Substantial Completion in 150 days Bidder agrees to reach Final Completion in 180 days ADDENDUM#1 Bid Form ATTACHMENT#1 page 3 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 Page 3°f 6 Rev 01-13-2016 00 30 01 BID FORM Project Name: Ralston Avenue Improvements -Staples to Alameda Project Number: E16271 Owner: City of Corpus Christi Bidder: OAR: Designer: Urban Engineering Basis of Bid Item DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDED QUANTITY AMOUNT Base Bid - (B) ASPHALT Part B-A-General(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-A1 Mobilization LS 1 B-A2 Bonds& Insurance LS 1 B-A3 Ozone Action Days DAY 3 B-A4 Traffic Control Plan Mobilization/Adjustments LS 1 B-A5 Traffic Control BMPs (Barrels, Cones, Etc) MO 7 B®A6 Clear R.O.W. AC 3 B-A7 SWPPP LS 1 B-A8 Silt Fence LF 500 B-A9 Inlet Protection EA 14 B-A10 Sod SY 2900 B-A11 Door Mangers, Printed and Delivered (2 Ea) LS 1 SUBTOTAL PART B-1-GENERAL(Items B-B1 thru B-B11) Part B-B-STREET IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-131 2" HMAC (Type 'D') SY 7289 B-132 Prime Coat (0.15 Gal/SY) GAL 1100 B-133 Limestone Base (Type A, Grade 1-2)(6" Min) SY 9170 B-134 Geogrid (TX-5) SY 9170 B-135 12" Compacted Subgrade SY 9170 B-136 HMAC Pavement Transitions SY 90 B-137 Salvage and Remove Existing Pavement SY 7289 B-138 Concrete Driveway SF 14870 B-139 Roadway Excavation SY 7289 B-1310 Curb and Gutter Removal LF 5210 B-1311 Sidewalk Removal SF 18550 B-1312 Driveway Removal SF 14870 B-1313 Street Sign Assembly 9" Blades and Stop Sign EA 6 B-1314 Other Regulatory Signs EA 1 B-1315 Allowance for Unanticipated Street Improvements LS 1 $ 20,000.00 SUBTOTAL PART B-B-STREET IMPROVEMENTS(Items B-B1 thru B-B15) ADDENDUM#1 Bid Form ATTACHMENT#1 page 1 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 Page 4°f 6 Rev 01-13-2016 00 30 01 BID FORM Item DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDED QUANTITY AMOUNT Part B-C-ADA IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B® 1 Concrete Sidewalk SF 22706 B-C2 RAP or Select Backfill Under Sidewalk SY 3210 B-C3 Sidewalk Retaining Curb LF 100 B-C4 Accessible Ramps SF 1475 B-05 JAIlowance for Unanticipated ADA Improvements LS 1 $ . 5,000.00 SUBTOTAL PART B-C-ADA IMPROVEMENTS(B-C1 THRU B-05) Part B-D-DRAINAGE IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B®D1 6" Standard Curb and gutter LF 5356 B-D2 5' Curb Inlet EA 13 B®D3 Remove Existing Inlet EA 7 B®D4 Remove Existing Pipe (Up to 24") LF 85 B-D5 Manhole Ring and Cover Adjustment EA 3 B-D6 Storm Manhole (Type 'A') EA 4 B-D7 Tie to Existing Manhole EA 2 B®D8 18" RCP LF 494 B-D9 24" RCP LF 357 B-D10 Trench Safety for Stom Water Pipe LF 851 B-D11 Safety Plan for Manholes and Inlets EA 17 B-D12 Allowance for Unanticipated Drainage Improvements LS 1 $ ;10,000.00 SUBTOTAL PART B-D-DRAINAGE IMPROVEMENTS(B-D1 THRU B-D12) Part B-E-WATER IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-E1 Fire Hydrant, Pipe and Fittings (Type 2) EA 3 B-E2 Extend Fire Hydrant Lead, Replace FH EA 2 IB-E3 6" D.I. Water Main LF 125 B-E4 6" D.I. 45° Bend EA 16 B-E5 Valve Box Adjustment EA 10 IB-E6 Service Connection Replacement EA 9 IB-E7 Trench Safety for Water Main LF 135 B-E8 Allowance for Unanticipated Water Improvements LS 1 $ 5,000.00 SUBTOTAL PART B-E-WATER IMPROVEMENTS(B-E1 THRU B-E8) ADDENDUM#1 Bid Form ATTACHMENT#1 page 2 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 Page 5°f 6 Rev 01-13-2016 00 30 01 BID FORM Item DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDED QUANTITY AMOUNT BID SUMMARY SUBTOTAL PART B-A-GENERAL(Items B-A1 thru B-A11) SUBTOTAL PART B-B-STREET IMPROVEMENTS (Items B-131 thru B-1317) SUBTOTAL PART B-C-ADA IMPROVEMENTS (Items B-C1 thru B-05) SUBTOTAL PART B-D- DRAINAGE IMPROVEMENTS (Items B-D1 thru B-D12) SUBTOTAL PART B-E-WATER IMPROVEMENTS (Items B-E1 thru B-E8) TOTAL PROJECT BASE BID (B)ASPHALT(PARTS B-A THRU B-E) Contract Times Bidder agrees to reach Substantial Completion in 1 150 Idays Bidder agrees to reach Final Completion in 1 180 Idays ADDENDUM#1 Bid Form ATTACHMENT#1 page 3 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 Page 6°f 6 Rev 01-13-2016 ���„�� �M saginaaS 6uuaaui6u� �o }uaw;aodaQ �z wawadms3„, SVX31 X34NI Ntlld 4Ntl 133HS 31111 � N JNIE133NION3 Il SIGHS S()d210S fo .11lj in z N^. �Ilp tl43Wtlltl Ol S3ldtl1S tt S1N3W3AOHdV4l 3nN3AV NO1S1VYi N --d— 1. dDlidl—G DN NDISIAIN w - sa Sooa`^ a apaoo oa 333oo0 - � Ix F _ adFQ___E w � Z N a gggggg'•(.� ooa �Zi Zig __ mo g T- N �g a00000000000000a0004- - �wv�3�m���u��� �v�vi�v�vi c�uc��nua3333v��v�vi�v�cr . .. ....... dam~ d'aaaaaaaa�n�n in.n�n in.n.n �Iz' O rE_�„<�mnm _`_______��n�N��N���.,.,�,MM.,Mn.. ....... .. .. ........ . .. ....... ....... N E - cq e m fyy _'Y Qj Gun;ao 22gg � �...'LLV LL �.. - °� LLV LIJ _ ”'v co m bN�� C�Fes-Q bI <cQ E1. ovo cn I,' 2 = O � 4 (W( J `� OJaw o o "9pv W W z ui NO o W z pE It w ;� Ld �e W nouvsinvry r^ R Z v, o — cn = � an3airy am o nouaooe �n`pM4°”��'o" �/�I�iIIj rr ✓� d�" p 000ma.o as nmol aoomxa no flj f/hr, as aarv3rary r<i r CL 0� 3 '��,• � spa �l t, ��k"m. _ C e e p� mf CL W P mr a u�e�� M saginaaS 6uuaaui6u� �o }uaw;aodaQ m' eS SVX31 S31ON 3Va3N3E) 914 W�IPNd M53N� IlSIbH� S(d20i fo llj NNin V43WVlV Ol SONIf�33NION3 tt S1N3W3n0idV4l 3fN3AV NOlSIVFi W ' --1— 777771 ON NDISIAIN 11 NDlidl-- DN NDISIAIN L� —N—0— SSS Ll'fZ'9 Il ym aw O _ zpo Lcco) (Cll) W G - ?a - - - - 3=wz o'a� �o-o �a c�mow 2Im Y=wmmooUFw - - _ , a < - � % �'xp>og� « Ig p— e zZ aI oaa3zo ogm 3ajomm�m VJf UOZNp _ - - - _ -- - ma ~_ W Q�a� ona ego- - lw - - - -'P-M-0 ..we 2Q z� Q ' oK� Wig- 'gamyztipU �oxaQFS = oq�> a - - w o O mwaaom O zwg� mQa p <_ m�Q3€_ - -zo& _ wma� - - _ -8�E!ooaz Z m ¢zo O �s�'wo as,< �k_a - m No�aYUUU� ¢ ogm a�� ado - i - ��&_ - O _ ¢ ¢�o> - -m - - m O ivy _ -W of O - g �owx, > aama�a�a¢aaw m a z5 ma- aa(n sau�w�'w"a'w`a_um�» N oauimwa JO QawaQo o x wn LL z mono 3 tea¢ zQaa w 0 o ao LLJ 0zQ'p�>muw� am 1. m¢mj oQK am Q~ typ�� vi rno v�G o mr' 030 _ m3aJ xoom z�— mwm 4O aovio om¢m o mem ap;�ww w NmJ LLg azar o�o oaw oaw - - ;zoo 00_ - � mowW - r rc wWE Y - - - w - -oJmSrc o3=¢vmripo - 33o moa = ¢ za .zap�z3p3 _ - l Sag SY5 owi - _ _ w'_a a��mmomo� s� (n i�> Z Z� - Z - - z'�m mea_ dam - W - U �o - g _pax"a�zoawa - - - - fmza w�a m r3 _ ���wae'r - J - -w w - - - _ mo�mmoo�z gm - ao-N o _ _zKa� w �, o6.a ,m�"LLo aagKm�o oozSaG��A�RH � � o a0 z o - - - g` a3Z. o - _ - - _ LL -- - - - z0y - Z. oz - 0 3 ago _ zw�~ w - - - wma aa= -X� - - �'� o�> _� - - _ � z pWmaw3�N��w - _ 5ow<�� _ X rw�zaw��az_ o3oa ZQmaQo¢ - - a3vi� 3 -�CiwW�i a¢;¢ �Uom - - - _ - - - m6 Z, � -o" md? _ _ Nkm - ok z� - mo o3wN - ��¢a3do�J>¢ai - �' -o3o�oaFV�mz - - 'o a3=vai�nmEm�>z 03? -_otr - - xao U3a - ffi - O � s _�'> - _ _ - - a5� _ _ _ Nzw 00zW. i`Tzw-,.-}S -o O _ Quo _- 03ama0xa a ?mm0 �� - --mio0 zl0 - Zz� do ¢Ciz - - N _ mkaatta_ ?�� - r3r�w U - ¢ LU tiw- w� xu g� o�a o�JOa3x o`F mmN¢mo 0;E a3�o0 R_ - FWw�o- - v'gz - - - - zrco z - - x�orwa"ozaw_rc� ��3rw - ani _ z-w a'3 w �gwwomw"z�owwww���om�F - aGm - - _ � ��Ga �-- m -- a mg8ti�w _ wmmx�3 �3� ¢ ov�aazm¢�o�3¢oa�ooa vaa?aFwma�¢�aa3om»mavi¢�3w�vi�ro aw oN� 3c0is?�¢oavi¢�avio PAuil ¢ - �v € �ow vii �azg as oz wym -1. - a z - �m a >€>w��n or> € omniG.Gmo¢a0arczooz� mQOQ po w ¢18 ¢ opzNzr Ja.anw3�NmQ'-r0UwN0�ivJ¢xr Z- 8. a - �o % w zm t pzo?f?r z~mz I€ - OW6 co�o3�azWo }Ci 3oom� wi n ura viim0ymom i�0o w W Q € i� zoN aha aaao Jai Q z3�¢oao 0�om�wza o�o3ti§>2,40 - -z - fr<� '�5< K'U¢ Z agpap�N o wga- -Qao ¢ o'�o3iomor a¢s g - - s v,°ao - N h = off - - mK ¢ Wim - w _m�_arcm m mmzm�Jxp LL, o - - - - aa¢m zg3wYm3m�p goNGNow 55 - -� ���mao�mx� U wam3a €adz€<a€zd zwrr zd€c. o €aaa€a-'g uF�� o3vwia ar�a¢> moo¢wm_r r¢wuowm a. wr 0movi30o3 mo vwiomr��� a�¢� m3�c0iw tt� rvo,.,,,,sdan. M sa�inaas 6uuaauibu3 �o }uaua;aodaQ SVX31 S31111Nvno 031VMI1S3 N ]]19 WMY4 MS 3NS _ 2 0 rON1833NIrON3 IlSIbHO Sndaon So Ills ° z Nv �nIft {g, V43Wtlltl Ol S31dV1S tl � o I S1N3W3AOHdW1 3nN3AV NO1SIVEI w N01- L#Wn4N30V 803 S31111NVno 431tl4dn SSS Ll'£Z'9 l kk kk Z N ? LULL N z ' 0 C] z LJ <Lij C] F < d d 3 '� titi tiz,ti Heti ti' � y Q � a [D LU Z s„ Asa i rF n IN �� wm° F O q w J gz CL O � ms osaae a;;a a as a a a e. eaa'eeaa . a eaa.aaea 9Pfl R"'P LLI �''! $ 9 IPPS 'P �'Y �P8A 7M RAS AP89RA^' a LLI cc � U E F E m E LU z 9 F ZO - a5� F a n {Ft a '� - Oa2 ad<sa<xea 1 <<< P �'.v= 1a«a k e w - O� Q 07 0] Q 0 O f!7 mLLI - O Er OUO Z Q W cnUZ W z O s- O C - z w aw= �=moo wm rvo,.,,,,�da�.,u„M saarnaas buuaaui6u3 }o ;uaw;aodaQ SVX31 d` VY 10HIN00 ON1833NION3 IlSIaHO sndaon !o lllj misan p Va3wVIV Ol S3IdV1S n o °. ou SlN3W3A0HdWI 3nN3AV NOlSIVE!Ift H g o a� p p Alameda Street a § ��� zcz:� r E FT zzz NZN Nzzz 4 og Ezzz aEEE Qa E $ -- �E`o E EEaEEo p froE Em �oo�e uJ o w LU Z ay o'E d E_ �z �_ prop U�Mra _ a 91 a q� e ad� o p e V ✓wN o c_ Off o ✓�Z W Vs o z GrtH oate°e .oEl F�rn�> G ii oFNVEH p2 A �a fb V�N�Z v3 .div, ftPN55d5 S� �� MAVIS A 0 v p o 0 X 5 — pc doti ��'ti d to E A Swa,ter Street— ti"lCwZ w 9 UZ 2 m� 5u� tt a r o ♦ �a EE - rogo bw�Wo�y 32 409 NAb� d 0>3 ,.00 S�dyy5 C rip W W6W x HWI oz v v 02 8 Sn� F p�Q oovW Q 4 O Z�C po r a r a o d n m a iyt�mN_ �r czi �% ,,33Q Off+ a l kq { a{ss4j0 m ro a sy y ++c7 z v sN r :v z r ao�.ive,x r zo a n His" p y? z e o� O c > ♦ lsZz �� o t„ laod o o S 3aa�IS saldols > z 0 ps wn. e-yy U z w s��e' o F ° d v Q VSON S3 NBbS.x 2.� yl �p�2M P .h�Q �wwsaginaaS 6uuaaui6u3 jo }uaw;coda[] a SVX31 NOUVINHOMI 3NI138VI3 w NYA19 W`AbYNOY ttff 3N1 I1SIaH� S(du 20S !o l� Nin tl43Wtlltl Ol S3ldtl1S0 z ONIH33NION3 +1 SIN3W3AOHdWl 3nN3AV NOlSIVEI NO-1— 777771 —SIAIN AB DN NDISIAIN I J STREETZ - - LL a��0 N IZD I0<0 Il.0 Cn Ua ^ Y I 0 G �f I -r of 0 co w e f• � Pe � z fu a PP I wN � � o Nm I amm - - � o m a o a w d P e z - RHI)R R,RVI' w 0 0 0 -- z I I � m e I x N m --. r. w LLJ s m Q° Grew I. .A ,-y f . ;y I G SWAN r Veli".R VaMV. I I.G.t �I z t31 0 a c2 G ^ I u a r.I w X 0 raw ca v P- I - w .7 8 S STAPLES S S FREET o avvsl��a�xi Sa!AaaS 6uuaaui6u3 )o }uaw;aodao SVX31 SNO1103S 1N3W3AVd .... d N Ilxq 9w lq:xEYkN ttE 3w ooizmo'orvweus ONIIA33NION3 I1SI21HO S(1d210i Jo llli z a z - Nv�n �IIpO V43WV-IV Ol S3ldV1S p IR N S1N3W3AOHdW1 3nN3AV NO1SlVEI N NOI1dIE1JS30 10 31tlO 'ON NOISIA3H NOI1 NOS30 AB 31tlO 'ON NOISI1321 pi am zg�G= io a aw oo�p P. o <- n-m-T mp pw e e ��po amaoc,�s�a N N N o N Yk LL�N LL C7 LV.I <LI.I C] F < 3 d <f1 � Q m 3 W w p W e ��w i 3 0 8 m 3 IT r g w 3 0 o 3 i3 �o i3 �ww rvo,.,,,,sda°. M sa�inaaS 6uuaauibu� {o }uaua;aodaQ SVX31 (L) OW30 ONV A3/uns OIHdVUE)Od01 w NYA19 W�bYNOY ttff 3N1 IlSIaH� S(du20S !o l� Nin tl43Wtlltl Ol S3Idtl1SM z I WH ONIH33NION3 S1N3W3AOHdWl 3nN3AV NOlSIVEI NO-1— ON NDISIAIN Wlidl-- 1. 1.. DN NDISIAIN —S S,210A—ns—3 V SSS 1l'CZ'9 l 2 " 6, 2� Lij Ly_ at*VOIV OO+S X11 -*00+--,�,...,, lH�1bW Lu <Lu << B e rt ` A r 1 ° i U 2 � W r1" i �I v Q �C 5i J n m ry ry m r ) t LU e t 4 , > — ZO AY 0 0 w LL ei LL — oo o� F a° F � w. g,; 0 n „ mLLa oza= �o,_o powwo < o awe s3-�dejs _ o z�oamo a o i k i s=e 4 00+0WVIS V 1� 3NI�3SV8 ` _��, 0p+9 ylS a �ww rvo,.,,,,sda°. M sa�inaaS 6uuaauibu� {o }uaua;aodaQ SVX31 (3) OW30 ONV A3 uns OIHdVHE)Od01 w NYA19 W�bYNOY ttff 3N1 ONIH33NION3 IlSIaHO S()d210S !o llo z WH NinIft Iu tl43Wtlltl Ol S3Idtl1S S1N3W3AOHdWl 3nN3AV NOlSIVEI —S S,210—ns—3 V SSS Ll'fZ'9 l t s Z � LL 0 OO+SL Y.L 3NIIHJIVw 00+02 V1Sw --u ��-, — ,�� r 0 L� 4 r <<0- p i o �I > �,. "'k 1t, 4 �ri At 1. LU � r t � o uv` r orr c A Itu ' OO o w o < LL �z 0 x n w za O ��� j' w w ro��< w =� m o=W cc �� oo a A <�o hlx �m � R M r Yeti Y�4g• dq e7(a{� nQ a my A s, — •�� Pgjr.I— — OO+OL VIS,. �NnHOIVH 'OO+SL oldW s �ww rvo,.,,,,sda°. M sa�inaaS 6uuaauibu� {o }uaua;aodaQ SVX31 (E) OW30 ONV A3/uns OIHdVUDOd01 Iw NYA19 W�bYNOY ttff 3N1 IlSIaH� S(du20S !o l� WH Nin tl43Wtlltl Ol S3ldtl1S toONIH33NION3 z S1N3W3AOHdWl 3nN3AV NO1SlVEi NO-1— 1. 1.. ON NDISIAIN NDI-N—G AB DN NDISIAIN —S S,210A—ns—3 V SSS Ll'fZ'9 l 7., I LU W 0 _ 0 qG Z oO+9Z V"J'""�"� 3NIlF1O1VW LU F<LU 0 0 e a� „n. J;v `` w m o 41 W oz m � =w wo z o 0 < w 4- . Ir s.- €ao oda .� z Lim omo�a oEo NXrcz�o��z� ry F >>a¢m gwo. =off ooaa�o � w a ti a� w ti�LLw ----. --. -_ ----. ------ wz<y�wwaa ss LLaswp _a� w�'s��� sa a�zswG= ° u ,�. 133a1S Va3NVlV ,4 OV ref°, b� +(Z;V1S <<,, Y � 1H VW — — �Z VIS 3NI-IH01VW ���� � rvo,.,,,,sda�.,�M sa�inaas 6uuaauibu� �o }uaua;aodaQ .N SVX31 dVW V3HV 3EJVNIVH4 w NYA19 W`AbYNOY ttff 3N1 LJNI»33NION3 IIS18HO snd210S !o Aiij z Nin m �iVul�ry tl43Wtlltl Ol S3ldtl1S W p SlN3W3A0HcW1 3nN3AV NOlSIVE1 N NOIN—O 1. -G ON NDINIAIN NDlidINDSIC IN I— -N ai %i$ �jri' 3/H HQ3WHlH ' / „ / u 1r lmT al % two, sa�lnaa5 6uaaui6u3 jo }uaw;aodao 11 1 �iu� u�= svx31 (y 3I1dOHd , IIS18HO sn�daoo (Ili 1S Nvuun WAHVIV Ol S3IdV1SJNI»33NIJN3 � 3 - z bl Ift S1N3W3AOHdW1 3nN3nV NOISIVEJ N w NO-1- 1. DISIAIN NOILL&NDSIG A8 DN NDISIAIN S—31OHNVN—S 03SI— SSS —Z'9 l Y.• - n n ry n 'n LU o r. 1 VW DO 5 V1 3 3NI-110J VY I w LU n < '9 <C d a ^ I ILL- — I s - II r t �= s€ II s j > � y I 0. € MH coo J P p o i i q / �.5.,; --• au" - _ - III % s .i, "a 8 I I I i i ,';^ ! i SII u II r ,� I R s ILL Ru a € €� d , -- ILL ff w - w W as 133 w _ - n a n = n _ 00+0'b1S WVIS 3NI-13SVS7-tt 0 1 1 V S N l3 V two, saginaa5 6uuaaui6u� �o }uaw;aodaQ Tu� SVX31 (Z) 3I130Hd {� IIS18HO sndaoo Nvuun 4NV NVId d31VMINHOIS dNV 133a1S - rJNI»33NIrJN3 !O (Ili z �Il��p� V43WVIV Ol S3IdV1S o Ift S1N3W3AOHcW41 3nN3AV NOlSIVEJ N w NO-1- 7777 ON NDISIAIN NDI-N—G AB DN NDISIAIN S—31OH——S 03SI— SlS —Z'9 l LL s UJ o o _00 S nHO1dW 0L Via 314111401M a LU " < << CL n� It w� a � F a I I ,I = II lV I _. 'ltl A n Y i9 Cia'vl o' Yl 09 �il u e. m y Y q W 7 _ Z g I E I "1 311 �I p € 'rm W d Pr - �p °a�xa m i 0 �w N w ----- , wBzBd 'a12 '�w € F 8 er a,u 00+5 yi 05via 311H3V o f✓/) xi sagin,aa5 6igaaei{i6q }o qua w;,aoda(f U wy 7NIaI�NI JNl 31 �£) 3IIdOad "' s NdB�� OS �� IlIS (INV NV�d a31VMWaO1S (INV 133a1S SVX IISI8HS sada s rn -�ygc a Va3WVIV Ol S3ldV1S .....� 2 Yom' S1N3W3AOHdWl 3nN3AV NOlSIVfi r_ s3du 31OHNVN NHOis a3s1n3 sus iuulwlviw16iw�iii!��muuumw 1 (� LU z -T: �1S � NI�6��1dW 00+% 1 NIH 1 W C) o-" .� .� I� <mi W F� J V w x , O q r _ al '� IL ` I >' I� ------------ All r, r 111113 11 i n w > I� �k J' + QIRS 14, T„ d °_ z O 41 NU � � I ¢� I i 2 mm 00 m � i M - a d na ' ,:�+✓' fir- / µ. °! _ z p �n �y 00+01 18 ;.,NIIHOIVW awo)es saglnaaS 6uuaaui6u� �o }uaw;aodaQ B��t SVX31 (b) 31IdOHd 4NV NVId EMMNUO1S dNV 133bi - '"s rJNI»33NIrJN3 IIS18HO sndaoi !� .11l� z Nvuun N z VI� tl43Wtlltl Ol S3Idtl1S Ift S1N3W3AOHcW41 3nN3AV NOlSIVEJ NO-1—i 1. N.LAIN Wlid-- AB DN NDISIAIN yS—31OH——S 03SI— SlS —Z'9 l n LL $R m mp 9 uj0 00+03 VIS �LVW -� et — LUW n �`�< w <Q F h n Lij ® - m <_ �gnaLu Gap.LLLL N� $ l S6 w a aao''lau 1 m M ND I'.tl 6B bZ'. a � D 1 1 o � I / I rc n F w a ox m� a m / .r w 3-4 8 . RR Yee ' + { o o € y tlo=`F: s ae 8 w i o CC t � Irl € 6e 14, € M` 3 m N irt4'� m I i r v 8- - - — - - - - _ c�, +m 1S IlHJ1VW 77 4 54 V S 3N lH 1 W a awae�� saginaa5 6uuaaui6u� �o }uaw;coda M SVX31 (3) 3113Oad cit _ 919 WVSWY�M53lu i IlSIaH� sndaon my s0 .11l0 4NV NVId b131VMWdOlS 4NV 133Ift d1S o w WH �n �Ilp V43WVIV Ol S3IdV1S rJNIi�33NIrJN3 NI S1N3W3AOHdWl 3nN3AV NOlSIVEI w S—31OHNVN WNO15 03S1— SlS 1t'CZ'9 l ,r. n n ry r T ".z LL LLJ o 00+9 " US C0+ Z VIS 3 41140.LVILU <uJ ca - - � — r < o II ti <� a I � ire o rcr n II II II 14 a w e n n l 16 rN � 5 Y r,e i 1 � II a a Z" CO �cc w IIS N rc 5- I nry �. ww e 5L Z1310 ltl Y l I I sla Xtl f'3 ao)sea i v LL kR y� C j k p C _ s w ', W� Ili i i in r � ' M / e rf E" s p0+07 3NI 0+ Gry n / awo,asp saginaa5 6uuaaui6u� �o }uaw;aodaQ SVx31 (s) 3IIdOad {� IlSIaH� sndaon !O (Ili dNV NVId a31VMWaOiS 4NV 133a1S w rJNI»33NIcJN3 Nin N tl43Wtlltl Ol S3Idtl1S a o S1N3W3AOHdW1 3nN3AV NO1SIVd N w S—iNVW—iS—1— SSS ZLiZ'9 L z LL 2 � u 0 W< LU d << C — G�= a� s�rc - € s � W W > > LLJ Z -i a J LLo CL w w , aF w 8 r , 133HIS Va3Nb1`d <<p a 31 1111 1. oma g ` - p + M, n' Z V MJ nA 1� 1 0+ Z b S 3 17 � d o �ww rvo,.,,,,sNa°. M sa�inaaS 6uuaauibu� {o }uaua;aodaQ SVX31 (L) SIVU31VI a31VMV4HOlS � w NYA19 W�WYW ttff 3N1 ONIH33NION3 IlSIaHO S()d210S !o llo tl43Wtlltl Ol S3ldtl1Sz mvuun cV Iu I S1N3W3AOHcW41 3nN3AV NO1SlVLi Ift S—31OH—WNO15 03SIn3i1 SlS Lt'CZ'9 l w u_ 0 r�rYY W UJ R <`[ U LL Tb Z Z m O O Wa , W COa i 11 111 Y CO 28 e1JCC" C" Z Z � 8 Uo Uo al O O _ H H C 0) R 31 �Cia°ii�l s°c Z sb O e< z _ a�N ry 07 r ssne 0 f✓/) xi sagin,aaS 6igaaei{i6q }o qua w;,aoda� o Ol HMIN`dMS IV NOlSIV Pow3 rJNIa39NIJNA IISI8HS Snd21 o }o .11l� - S�IVl34 dWtla 8df1O NtlId1S343d s ti rivoun �0 V(33NVIV Ol S3ldV1S .__.. N 2 — �,.� � S1N3W3AOtidWl 3f1N3AV NOlSIt/fi � r_ 133H5 13a(IY SlS !l'CZ'9 l IIuIIuIIuluiv o a " ww 4th w 4k: LL o � x r �� " � m Ga o� K a 2 o � w a g xw� o a � y orco rc"o ow a w luuluuluuluuluuluuluuluuluuluul ..,�" a .." N r a zw r IV41 G' I z ... . J n z M z rvo,.,,,,sda�.,M sa�inaas 6uuaauibud {o }uaua;aodaQ SVX31 W NVId U31VM IlSIaHO S(�dp20S jo 115 MNin tl43Wtlltl Ol S3ldtl1SONIH33NION3 z WH S1N3W3AOHdWl 3nN3AV NO1SIVEi NO-1— ON NDISIAIN Wlidl-- 1. 1.. DN NDISIAIN ---- OO+OI d1S IlH�1dW - �u Iz� LL I w w< w ---- _ n (D w I << a 3 � I= w 3 s �.� V m w w z _ z J Q - W - - - IL � w� — LL w„ r s A o — --- _ J s J i I ry ' _-- - I 3 I _ 1331i1S - - `- S3l b'1S s � - - ....... _ _ _ _ OO+ visltlVIS 3WI-I3SVS ..... " " O0*9 avvsi��nn Sa!A1OS 6uuaaui6u3 )o }uaw;aodao I-, M'�'.N„ '��'� MSVX31 (Z) NVId U31VM � �........ d N 919N<Iq:xEYkN T33w ooizmo'orv�weu s ONIIA33NION3 I1S121HO S(1d210i do Aili z M,o z - Nv{ean �Ilp V43WV-IV 01 S3ldV1S p SIMMAOUN41 3nN3AV NO1SlVF1 N NONd1-1 A9 III IN 11I1IA3H NOI1 NOS34 A. 31tlO 'ON NOS— ED I � C? I tl+ 00+54 N R 301-1HOIM 00+OZ VIS am `' hl � - - - � � LLJ�0 - - - - �— m 0 I I I` I m , a I _ I w>n Ir n I o. .• � Y — 3 ' ��� — - ' Q Q W al K` a� I r 1 M I LL o I v � 4 N ._ w — — Z W_A Z m Al n u , i y I I Id r I " II I P I g a I x I 0 It I k I Q x I t I N µ y 0 0 — - - OO+OL '. _. 21HOlVIN - - - - -+ I 1VW I two) rvo,.,,,,sda�.,M sa�inaaS 6uuaauibu� �o }uaua;aodao 9� 3 cwt SVX31 (£) NVId d31VM w rJNI»33NIrJN3 I1S18H,9 sndaoo !o .Alii iii z N �n V43WVIV Ol S31dV1S M S1N3W3AOHdWl 3nN3AV NOlSIVd Ift NO-1— 1. ON NDISIAIN NDI-N—G DN NDISIAIN Yk� a '. 2 o - - 00+5 1S�- NIlHO1VV4 , LU <u W � a ' o�. w J az J CL r. t > w3 © z 0 xm 133d� Va3WV� T ww 3 A w� LL w z z � r 00+OZ VI \\ 0+ Vlj3 0 two) rvo,.,,,,sda°. M sa�lnaas 6uuaauibu� �o }uaua;aodao NYA19 W°AbYNM ttff 3x SVX31 SWH31VI 3NI3 831VM rJNI»33NIrJN3 IIS18HO sndaoo !o .111j ° z Nvuun V43WVlV Ol S31dV1S c Ift S1N3W3AOHdWl 3nN3AV NO1SlVd ZLL 2' LLJ(o zr�a LU <uJ C] < d < o� m � J g z s f W- W W N' I I o 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT 1.00 GENERAL 1.01 MEASUREMENT AND BASIS FOR PAYMENTS ON LUMP SUM ITEMS A. Include all cost for completing the Work in accordance with the Contract Documents for lump sum payment items. Include all direct cost for the Work associated with that lump sum item and a proportionate amount for the indirect costs as described in SECTION 0129 00 APPLICATION FOR PAYMENT PROCEDURES for each lump sum item. Include cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the lump sum price. B. Measurement for progress payments will be made on the basis of the earned value for each item shown as a percentage of the cost for the lump sum item as described in SECTION 0129 00 APPLICATION FOR PAYMENT PROCEDURES. Payment at Final Completion will be equal to the total lump sum amount for that item. 1.02 MEASUREMENT AND BASIS FOR PAYMENTS ON UNIT PRICE ITEMS A. Include all cost for completing the Work in accordance with the Contract Documents in unit price payment items. Include all direct cost for the Work associated with that unit price item and a proportionate amount for the indirect costs as described in SECTION 0129 00 APPLICATION FOR PAYMENT PROCEDURES for each unit price item. Include cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the unit price. B. Measurement for payments will be made only for the actual measured and/or computed length, area, solid contents, number, and weight, unless other provisions are made in the Contract Documents. Payment on a unit price basis will not be made for Work outside finished dimensions shown in the Contract Documents. Include cost for waste, overages, and tolerances in the unit price for that line item. Measurement will be as indicated for each unit price item. 1.03 MEASUREMENT AND BASIS FOR PAYMENT FOR BASE BID ITEMS A. Bid Item A-A1, B-A1 - Mobilization: 1. Include the following costs in this Bid item: a. Transportation and setup for equipment; b. Transportation and/or erection of all field offices, sheds, and storage facilities; C. Salaries for preparation of documents required before the first Application for Payment; d. Salaries for field personnel assigned to the Project related to the mobilization of the Project; e. Demobilization; and f. Mobilization may not exceed 5 percent of the total Contract Price. ADDENDUIIVI##1 ATTACHMENT#R3 PAGE 1 of 14 Measurement and Basis for Payment 0129 01-1 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 2. Measuring for payment is on a lump sum basis. Payment for mobilization will be based on the earned value of Work completed. B. Bid Item A-A2, B-A2 - Bonds and Insurance: 1. This item shall be measured by Lump Sum. 2. This Item shall include the following costs: a. Bonding and Insurance C. Bid Item A-A3, B-A3-Ozone Action Days: 1. This item shall be measured by Day. 2. This item shall include Monetary loss caused by inability to work on officially announced Ozone Action Days. D. Bid Item A-A4, B-A4-Traffic Control Plan Mobilization/Adjustments: 1. This item shall be measured by Lump Sum. 2. This item shall include but is not limited to the following work: a. Preparation and original placement of a traffic control plan. b. Any other items required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. E. Bid Item A-A5, B-A5-Traffic Control BM Ps (Barrels, Cons, Etc): 1. This item shall be measured by Month. 2. This item shall include but is not limited to the following work: a. Placement and maintenance of Bid Item. b. Any other items required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. . -1-. This ite-R; shall be Measured by Lump Supp'. -2-. This ite—R; shall iRe-1--ide but is Ret limited-te the felle;.viRg WqFk� .,.....-.J L...-.+L..... %vii.. ...........- and utilities (City,AT&T, ACD etc.).This pay item is to pay i as i i eXtFa i iequipment, and subee-Mracts. All time related to these FeqUiFeFnents aFe included. Payment fR-.r Utility COWdination will be .J. tiR ADDEIVC�UIM##1 ATTACHMENT#R3 PAGE 2 of 14 Measurement and Basis for Payment 0129 01-2 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 G. Bid Item A-A6, B-A6—Clear ROW: 1. This item shall be measured by Acre. 2. Item shall include but is not limited to: a. Excavation of roots, stumps,grasses, and other items far enough below ground to not effect construction of proposed improvements. b. Backfill of excavations. C. Removal of cleared material. d. Any other items required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. H. Bid Item A-A7, B-A7 -SWPPP: 1. This item shall be measured by Lump Sum. 2. This item shall include but is not limited to the following work: a. Maintaining paperwork and permitting as required by state regulation. b. Any other items required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. I. Bid Item A-A8, B-A8—Silt Fence: 1. This item shall be measured by Linear Foot. 2. This item shall include but is not limited to the following work: a. Furnish, Install, Maintain, then remove Silt Fence. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. J. Bid Item A-A9, B-A9—Inlet Protection: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Furnish, Install, Maintain, then remove Inlet Protection. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. K. Bid Item A-A10, B-A10—Sod: 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Finish grading. b. Placement of Sod, including all practices to insure growth. C. Proper establishment of growth. d. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this b' ADDENDUM##1 ATTACHMENT#R3 PAGE 3 of 14 Measurement and Basis for Payment 0129 01-3 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 L. Bid Item A-A11, B-A11—Door Bangers, Printed, and Delivered (2 Ea): 1. This item shall be measured by Lump Sum. 2. This item shall include but is not limited to the following work: a. Printing and Installing the two required door hangers to all residents with property abutting the limits of construction.The door hangers shall measure 4.25"x 11" and be printed on 65 lb card stock paper. One set of door hangers will be printed on a white background and the second set will be printed on neon green background.The city will provide all information to include on each door hanger for the contractor to print and deliver.The city will inform the contactor when each set of door hangers are to be delivered. b. Any other items required to complete this bid item in accordance with these contact documents that are not measured and paid under this bid item. M. Bid Item A-B1—6"Jointed Reinforced Concrete Pavement: 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Final subgrade a preparation, concrete, reinforcement, and jointing. b. Any other items required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. N. Bid Item B-B1—2" HMAC (Type 'D'): 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Furnish and install tack coat as necessary. b. Furnish and install Hot Mix Asphaltic Concrete. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. O. Bid Item A-132—Lime Stabilized Subgrade (7.5%by weight): 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Application of lime to subgrade. b. Compaction and finish grading as required. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. P. Bid Item B-132—Prime Coat(0.15 Gal/SY): 1. This item shall be measured by Gallon. 2. This item shall include but is not limited to the following work: a. Application and maintenance of seal coat. ADDEIVC�UIM##1 I TTAd;HMENT#R3 PAGE 4 of 14 Measurement and Basis for Payment 0129 01-4 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 b. Any other items required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. Q. Bid Item B-133—Limestone Base (Type A, Grade 1-2) (6" Min): 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Furnish and install all base material. b. Grading and compaction of Base. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. R. Bid Item A-133, B-135—12" Compacted Subgrade: 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Grading and compaction of Subgrade. b. Where subgrade is lime stabilized this item shall include payment for compaction of the top 12" of subgrade including the lime stabilized portion. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. S. Bid Item B-134—Geogrid (TX-5): 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Furnish and Install Geogrid. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. T. Bid Item A-134, B-136—HMAC Pavement Transitions: 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Demolition, saw-cutting, removal and disposal of existing material. b. 8" Compacted subgrade. C. Geogrid (Tx-5) d. Furnish and install 8" limestone (Type A, Grade 1) base material. e. Furnish and install prime coat. f. Furnish and install 2" Hot Mix Asphaltic Concrete. (Type D) g. Re-striping. ADDENDUM##1 ATTACHMENT#R3 PAGE 5 of 14 Measurement and Basis for Payment 0129 01-5 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 h. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. U. Bid Item A-135, B-137—Salvage and Remove Existing Pavement: 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Removing existing asphalt b. Re-stratifying material to meet particle size requirements. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. V. Bid Item A-136, B-138—Concrete Driveway: 1. This item shall be measured by Square Foot. 2. This item shall include but is not limited to the following work: a. Furnish and install subgrade preparation, concrete, reinforcement, and jointing. b. Pavement shall begin and end at the point where the sidewalk joints to the thicker section required for the Driveway. C. This item shall pay for driveways as required to meet the slope requirements detailed in the plans. d. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. W. Bid Item A-137, B-139—Roadway Excavation: 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Reshaping existing material for proposed grade changes b. Removal, haul off, and placement of material as necessary. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. X. Bid Item A-138, B-1310—Curb and Gutter Removal: 1. This item shall be measured by Linear Foot. 2. This item shall include but is not limited to the following work: a. Deconstruction, removal, haul off, and disposal of existing curb and gutter material. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. Y. Bid Item A-139, B-1311—Sidewalk Removal: 1. This item shall be measured by Square Foot. ADDENDUM##1 ATTACHMENT#R3 PAGE 6 of 14 Measurement and Basis for Payment 0129 01-6 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 2. This item shall include but is not limited to the following work: a. Deconstruction, Removal, haul off, and disposal of existing sidewalk. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. Z. Bid Item A-1310, B-1312—Driveway Removal: 1. This item shall be measured by Square Foot. 2. This item shall include but is not limited to the following work: a. Deconstruction, Removal, haul off, and disposal of existing driveway. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. AA. Bid Item A-1311, B-1313—Street Sign Assembly w/9" blades and Stop Sign: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Furnish and Install Stop Sign, Blades, and sign assemblies. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. BB. Bid Item A-1312, B-1314—Other Regulatory Signs: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Furnish and install sign, pole, and assemblies. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. CC. Bid Item A-1313, B-1315—Allowance for Unanticipated Street Improvements: 1. This item shall be measured by Lump Sum. 2. This item shall include but is not limited to the following work: a. Any street improvements not covered by a bid item. b. Any quantity over run of other bid items. C. Prices must be negotiated for each new bid item. DD. Bid Item A-C1, B-C1—Concrete Sidewalk: 1. This item shall be measured by Square Foot. 2. This item shall include but is not limited to the following work: a. Furnish and install base preparation, concrete, reinforcement, and jointing. b. Pavement shall begin and end at the point where the sidewalk joints to the thicker section required for the Driveway. ADDENDUIIVI##1 ATTACHMENT#R3 PAGE 7 of 14 Measurement and Basis for Payment 0129 01-7 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 C. This item shall pay for sidewalks as required to meet the slope requirements detailed in the plans. d. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. EE. Bid Iters A®C2, B®C2—RAP or Select Backfill Under Sidewalk/Driveway: 1. This item shall be measured by Square Yard. 2. This item shall include but is not limited to the following work: a. Finish Grading of Subgrade. b. Furnish and Install RAP or Select Backfill Material. C. Grading and compaction of Base. d. Maintenance of base prior to place of sidewalk. e. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. FF. Bid Item A-C3, B-C3—Sidewalk Retaining Curb: 1. This item shall be measured by Linear Foot, regardless of height. 2. This item shall include but is not limited to the following work: a. Furnish and install all concrete, expansion joints, reinforcement, and ties to existing or proposed concrete sidewalk. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. GG. Bid Item A-C4, B-C4—Accessible Ramps: 1. This item shall be measured by Square Foot. 2. This item shall include but is not limited to the following work: a. Furnish and install concrete, reinforcement,jointing, truncated domes, and curb surrounding ramps. b. Payment and include all ramps, landing and additional retaining curb relative to Accessible Ramps. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. HH. Bid Item A-05, B-05—Allowance for Unanticipated ADA Improvements: 1. This item is an Allowance for Unanticipated items. Payment and Measurement shall be negotiated per item. II. Bid Item A-DI, B-D1—6" Standard Curb and Gutter: 1. This item shall be measured by Linear Foot. 2. This item shall include but is not limited to the following work: a. Removal of existing curb. ADDENDUM##1 ATTACHMENT#R3 PAGE 3 of 14 Measurement and Basis for Payment 0129 01-8 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 b. Providing, placing, and compacting subgrade. C. Furnish and install all concrete, expansion joints, reinforcement, and ties to existing or proposed concrete pavement. d. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. JJ. Bid Item A-D2, B-D2—5' Curb Inlet: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Reinforced Concrete installed by open cut excavation; including removing all material encountered and disposing of all unsuitable and/or excess material. Grading and cleaning up of pipe trench and affected area. b. Excavation required to perform work. C. Furnishing and installing concrete, reinforcement, and jointing materials. d. Furnishing and installing bedding and backfill. e. Furnishing and installing protective measures for utilities with minimal clearance. f. OSHA trench protection as required. g. Dewatering as required. h. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. KK. Bid Item A-D3, B-D3—Remove Existing Inlet: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Demolition of all abandoned inlets. b. Removal of material from site. C. Backfill and compaction as necessary. d. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. LL. Bid Item A-D4, B-D4— Remove Existing Pipe (Up to 24"): 1. This item shall be measured by Linear Foot. 2. This item shall include but is not limited to the following work: a. Demolition of all abandoned storm pipe. b. Removal of material from site. C. Backfill and compaction as necessary. d. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. ADDENDUIIVI##1 ATTACHMENT#R3 PAGE 9 of 14 Measurement and Basis for Payment 0129 01-9 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 MM.Bid Item A-D5, B-D5—Manhole Ring and Cover Adjustment: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Minor reworking of existing manhole, corbel, ring and cover as necessary to change finished elevation of manhole cover to match new pavement. b. May include replacement of the ring and cover as necessary. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. NN. Bid Item A-D6, B-D6—Storm Manhole (Type 'A'): 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Manhole installed by open cut excavation; including removing all material encountered and disposing of all unsuitable and/or excess material. Grading and clearing up of pipe trench and affected area. b. Excavation required to perform work. C. Furnishing and installing concrete, reinforcement, and jointing materials. d. Furnishing and installing backfill. e. OSHA trench protection as required. f. Dewatering as required. g. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. 00. Bid Item A-D7, B-D7—Tie to Existing Manhole: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Any Cost of tie-in between proposed storm main and existing manholes or inlets.. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. PP. Bid Item A-D8, B-D8—18" RCP: 1. This item shall be measured by Linear Foot. 2. This item shall include but is not limited to the following work: a. Reinforced Concrete Pipe installed by open cut trench excavation; including removing all material encountered and disposing of all unsuitable and/or excess material. Grading and cleaning up of pipe trench and affected area. b. Trenching required to perform work. C. Furnishing and installing concrete, reinforcement, and jointing materials. d. Furnishing and installing bedding and backfill. ADDENDUM##1 ATTACHMENT#R3 PAGE 10 of 14 Measurement and Basis for Payment 01 29 01-10 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 e. Furnishing and installing protective measures for utilities with minimal clearance. f. OSHA trench protection as required. g. Dewatering as required. h. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. QQ. Bid Item A-D9, B-D9—24" RCP: 1. This item shall be measured by Linear Foot. 2. This item shall include but is not limited to the following work: a. Reinforced Concrete Pipe installed by open cut trench excavation; including removing all material encountered and disposing of all unsuitable and/or excess material. Grading and cleaning up of pipe trench and affected area. b. Trenching required to perform work. C. Furnishing and installing concrete, reinforcement, and jointing materials. d. Furnishing and installing bedding and backfill. e. Furnishing and installing protective measures for utilities with minimal clearance. f. OSHA trench protection as required. g. Dewatering as required. h. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. RR. Bid Item A-D10, B-D10—Trench Safety for Storm Water Pipe: 1. This item shall be measured by Linear Foot of trench regardless of depth. 2. This item shall include but is not limited to the following work: a. Trench Safety shall be provided for any excavation or any part of a trench regardless of depth and shall include the cost to provide trench safety as set out in Specification. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. SS. Bid Item A-D11, B-D11—Safety Plan for Manholes and Inlets: 1. This item shall be measured by Each regardless of depth. 2. This item shall include but is not limited to the following work: a. Safety shall be provided for any excavation over 18". b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. TT. Bid Item A-D12, B-D12—Allowance for Unanticipated Drainage Improvements: 1. This item shall be measured by Lump Sum. 2. This item shall include but is not limited to the following work: ADDENDUM##1 ATTACHMENT#R3 PAGE 11 of 14 Measurement and Basis for Payment 01 29 01-11 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 a. Any Stormwater items not covered by a bid item. b. Any quantity over run of other bids items. C. Project must be negotiated for each new bid item. UU. Bid Item A-E1, B-E1— Fire Hydrant, Pipe and Fittings (Type 2): 1. This item shall be measured by Each fire hydrant listed in the proposal and illustrated on the plans. 2. This item shall include but is not limited to the following work: a. Supplying and installing all fittings,tees, bends, adapters, and pipe required on plans, including excavation and backfilling. b. Supply and installing the fire hydrant, gate valve, and box. C. Grading and cleaning up the affected area. d. All tapping saddles, valves, pipe, and fittings required to tie-in to the main. e. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. VV. Bid Item A-E2, B-E2— Extend Fire Hydrant Lead, Replace FH: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Cost associated with relocating hydrant. b. Furnish and installing pipe, and fittings. C. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. WW. Bid Item A-E3, B-E3—6" D. I. Water Main: 1. This item shall be measured by Linear Foot. 2. This item shall include but is not limited to the following work: a. Pipe installed by open cut trench excavation; including removing all material encountered and disposing of all unsuitable and/or excess material. Grading and cleaning up of pipe trench and affected area. b. Furnishing and installing pipe with a#12 copper coated W.P. detector wire. C. Hydrostatic testing and flushing of completed lines. d. Sterilizing of compacting water lines. e. Placing and compacting backfill. f. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. XX. Bid Item A-E4, B-E4—6" D. I. 45° Bend: 1. This item shall be measured by Each ductile iron fitting. ADDENDUIIVI##1 ATTACHMENT#R3 PAGE 12 of 14 Measurement and Basis for Payment 01 29 01-12 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 2. This item shall include but is not limited to the following work: a. Furnish and install ductile iron fitting. b. Embedment. C. Furnish and install Polyethylene Wrap. d. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. YY. Bid Item A-E5, B-E5—Valve Box Adjustment: 1. This item shall be measured by Each. 2. This item shall include but is not limited to the following work: a. Reworking of Existing Valve Box to match proposed grade. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. ZZ. Bid Item A-E6, B-E6—Service Connection Replacement: 1. This item shall be measured by Each individual service of each type installed and shall include all pipe,fillings, etc., as required to complete the service from the new water line to the meter. 2. This item shall include but is not limited to the following work: a. Installation of new Corp Stop. b. All other parts and pieces required. C. Replacement of waterline. d. Tie in to existing service. e. Removal of all existing materials abandoned by this activity. f. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. AAA. Bid Item A-E7, B-E7—Trench Safety for Water Main: 1. This item shall be measured by Linear Foot of trench regardless of depth. 2. This item shall include but is not limited to the following work: a. Trench safety shall be provided for any excavation or any part of a trench regardless of depth and shall include the cost to provide trench safety as set out in in the specifications. b. Any other item required to complete this bid item in accordance with these contract documents that are not measured and paid under this bid item. BBB.Bid Item A-E8, B-E8—Allowance for Unanticipated Water Improvements: 1. This item shall be measured by Lump Sum. 2. This item shall include, but is not limited to the following work: a. Any water improvements not covered by a bid item. ADDENDUM##1 ATTACHMENT#R3 PAGE 13 of 14 Measurement and Basis for Payment 01 29 01-13 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 b. Any quantity over run of other bid items. C. Prices must be negotiated for each new bid item. 1.04 MEASUREMENT AND BASIS FOR PAYMENT FOR ALTERNATES AND ALLOWANCES (NOT USED) 2.00 PRODUCTS(NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION ADDENDUIIVI##1 ATTACHMENT#R3 PAGE 14 of 14 Measurement and Basis for Payment 01 29 01-14 Ralston Avenue Improvement-Staples to Alameda—Project No. E16271 Rev 01-13-2016 009101 ADDENDUM NUMBER 2 ..................... ............ ------ Project: Ralston Avenue Improvements Staples to Alame Project Number: E16271 Owner: City of Corpus Christi .......... --------------- ------- city Engineer: J� H, Edmonds, P.E.(",,,,, Designer: Urban En ineering ......................__-------------........................... ......... .......... ........ Addendum No. Specification Section: 009101 Issue Date: 06/26/2017 Acknowledge receipt of this Addendum in the Bid Acknowledgement Form submitted for this Project. Failure to acknowledge receipt of this addendum in the Bid Acknowledgement Form may render the Bid as non-responsive and serve as the basis for rejecting the Bid. Make the additions, modifications,or deletions to the Contract Documents described in this Addendum. Approved by: Urban Engineering Murray F. Hudson, P. E. 06/26/2017 Name oat e S�: "e Addendum items: N 4 "o I Note to Deslaner:Fill this in. '0, MORRAY F HUMS0 ARTICLE 1—Bidding Requirements 0 % 78198 00 30 01 BID FORM—Attachment No. 1 URBAN ENGINEERING ................. ................. ............ ............. TBPE FIRM No, 145 ........... ARTICLE 1—BIDDING REQUIREMENTS 1-D1 ACKNOWLEDGE ADDENDA A. Acknowledge receipt of this Addendum in the Bid Acknowledgement Form submitted for this Project. Failure to acknowledge receipt of this addendum in the Bid Acknowledgement Form may render the Bid as non-responsive and serve as the basis for rejecting the Bid. B. SECTION 00 30 01 BID FORM -(A)CONCRETE and (B)ASPHALT: DELETE: SECTION 00 30 01 BID FORM (A)CONCRETE and (B)ASPHALT in their entirety. ADD: SIECTIQN 00 30 01 BID FORM (A)CONCRETE and(B)ASPHALT in their entirety (Attachment No. 1). END OF ADDENDUM NO.2 Addendum No.2 009101-1 Ralston Avenue Improvements—Staples to Alameda—Project No. E16271 Rev 01-13-2016 00 30 01 BID FORM Project Name: Ralston Avenue Improvements-Staples to Alameda Project Number: E16271 Owner: City of Corpus Christi Bidder: OAR: Designer: Urban Engineering Basis of Bid Item DESCRIPTION UNIT ESTIMATEDUNIT PRICE EXTENDED QUANTITY: AMOUNT Base Bid -(A) CONCRETE Part A-A-General(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-A1 Mobilization LS 1 A-A2 Bonds& Insurance LS 1 A-A3 Ozone Action Days DAY 3 A-A4 Traffic Control Plan Mobilization/Adjustments LS 1 A AS Traffic Conrol BM Ps (Barrels, Cones, Etc) MO 5 A-A6 Clear R.O.W. AC 3 A-A7 SWPPP LS 1 A-A8 Silt Fence LF 500 A-A9 Inlet Protection EA 14 A-A10 Sod SY 2900 A-A11 Door Hangers, Printed and Delivered (2 Ea) LS 1 SUBTOTAL PART A-A-GENERAL(Items A-A1 thru A-A11) Part A-B-STREET IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-B1 6"Jointed Reinforced Concrete Pavement SY 8160 A-132 Lime Stabilized Subgrade (7.5% by Weight) SY 9170 A-133 12" Compacted Subgrade SY 9170 A-134 HMAC Pavement Transitions SY 90 A-135 Salvage and Remove Existing Pavement SY 7289 A-136 Concrete Driveway SF 14870 A-137 Roadway Excavation SY 7289 A-138 Curb and Gutter Removal LF 5210 A-139 Sidewalk Removal SF 18550 A-1310 Driveway Removal SF 14870 A-B11 Street Sign Assembly 9" Blades and Stop Sign EA 6 A-1312 Other Regulatory Signs EA 1 A-1313 lAllowance for Unanticipated Street Improvements LS 1 $ 20,000.00 SUBTOTAL PART A-B-STREET IMPROVEMENTS(Items A-B1 thru A-1313) .......................u. AIDDENDLIM No, 2 Bid Form ATTA'CHII TENT Now 1' Page 1 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 PAGE 1 of 6 Rev 01-13-2016 00 30 01 BID FORM Item DESCRIPTION UNIT ESTIMATED I UNIT PRICE EXTENDED QUANTITY: AMOUNT Part A-C-ADA IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-C1 Concrete Sidewalk SF 22706 A-C2 RAP or Select Backfill Under Sidewalk/Driveway SY 3210 A-0 Sidewalk Retaining Curb LF 100 A-C4 Accessible Ramps SF 1475 A-05 JAIlowance for Unanticipated ADA Improvements LS 1 $ 5,000.00 SUBTOTAL PART A-C-RTA IMPROVEMENTS(Items A-C1 thru A-05) Part A-D-DRAINAGE IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-D1 6"Standard Curb LF 5356 A-D2 5' Curb Inlet EA 13 A-D3 Remove Existing Inlet EA 7 A-D4 Remove Existing Pipe (Up to 24") LF 85 A-D5 Manhole Ring and Cover Adjustment EA 3 A-D6 Storm Manhole (Type 'A') EA 4 A-D7 Tie to Existing Manhole EA 2 A-D8 18" RCP LF 494 A-D9 24" RCP LF 357 A-D10 Trench Safety for Storm Water Pipe LF 851 A-D11 Safety Plan for Manholes and Inlets EA 17 A-D12 Allowance for Unanticipated Drainage Improvements LS 1 $ 10,000:00 SUBTOTAL PART A-D-DRAINAGE IMPROVEMENTS(A-D1 THRU A-D12) Part A-E-WATER IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-E1 Fire Hydrant, Pipe and Fittings(Type 1) EA 3 A-E2 Extend Fire Hydrant Lead, Replace FH EA 2 A-E3 6" D.I. Water Main LF 125 A-E4 6" D.I. 450 Bend EA 16 A-E5 Valve Box Adjustment EA 10 A-E6 Service Connection Replacement EA 9 A-E7 Trench Safety for Water Main LF 135 A-E8 Allowance for Unanticipated Water Improvements LS 1 $ 5,000`00 SUBTOTAL PART A-E-WATER IMPROVEMENTS(A-E1 THRU A-E8) ADDENDUM 1N o. 2 ATTA.C1fll' EW No "t. Bid Form PAGE'2 f 6 Page 2 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 Rev 01-13-2016 00 30 01 BID FORM Item DESCRIPTION UNIT ESTIMATEDUNIT PRICE EXTENDED QUANTITY: AMOUNT BID SUMMARY SUBTOTAL PART A-A-GENERAL(Items A-A1 thru A-A11) SUBTOTAL PART A-B-STREET IMPROVEMENTS (Items A-131 thru A-1313) SUBTOTAL PART A-C-ADA IMPROVEMENTS (Items A-C1 thru A-05) SUBTOTAL PART A-D- DRAINAGE IMPROVEMENTS (Items A-D1 thru A-D12) SUBTOTAL PART A-E-WATER IMPROVEMENTS (Items A-E1 thru A-E8) TOTAL PROJECT BASE BID(A)CONCRETE-(PARTS A-A THRU A-E) Contract Times Bidder agrees to reach Substantial Completion in 1 150 Idays Bidder agrees to reach Final Completion in 1 180 Idays ADDENDLIhA N , 2 Bid Form A1"TA.CN'IG' EN'S No.1, PACE 3 of 6 Page 3 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 Rev 01-13-2016 00 30 01 BID FORM Project Name: Ralston Avenue Improvements-Staples to Alameda Project Number: E16271 Owner: City of Corpus Christi Bidder: OAR: Designer: Urban Engineering Basis of Bid Item DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDED QUANTITY AMOUNT Base Bid - (B) ASPHALT Part B-A-General(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-A1 Mobilization LS 1 B-A2 Bonds & Insurance LS 1 B-A3 Ozone Action Days DAY 3 B-A4 Traffic Control Plan Mobilization/Adjustments LS 1 B AS Traffic Control BMPs (Barrels, Cones, Etc) MO S B-A6 Clear R.O.W. AC 3 B-A7 SWPPP LS 1 B-A8 Silt Fence LF 500 B-A9 Inlet Protection EA 14 B-A10 Sod SY 2900 B-A11 Door Hangers, Printed and Delivered (2 Ea) LS 1 SUBTOTAL PART B-1-GENERAL(Items B-B1 thru B-B11) Part B-B-STREET IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-BI 2" HMAC (Type 'D') SY 7289 B-132 Prime Coat (0.15 Gal/SY) GAL 1100 B-133 Limestone Base (Type A, Grade 1-2)(6" Min) SY 9170 B-134 Geogrid (TX-5) SY 9170 B-135 12" Compacted Subgrade SY 9170 B-136 HMAC Pavement Transitions SY 90 B-137 Salvage and Remove Existing Pavement SY 7289 B-138 Concrete Driveway SF 14870 B-139 Roadway Excavation SY 7289 B-1310 Curb and Gutter Removal LF 5210 B-1311 Sidewalk Removal SF 18550 B-1312 Driveway Removal SF 14870 B-1313 Street Sign Assembly 9" Blades and Stop Sign EA 6 B-1314 Other Regulatory Signs EA 1 B-1315 Allowance for Unanticipated Street Improvements LS 1 $ 20,000.00 SUBTOTAL PART B-B-STREET IMPROVEMENTS(Items B-B1 thru B-B15) ADDENDIUM No. 2 Bid Form AT°f"ACftl ErTr lo.J. Page 1 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 PAGE 4of 6 Rev 01-13-2016 00 30 01 BID FORM Item DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDED QUANTITY AMOUNT Part B-C-ADA IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-C1 Concrete Sidewalk SF 22706 B-C2 RAP or Select Backfill Under Sidewalk SY 3210 B-C3 Sidewalk Retaining Curb LF 100 B-C4 Accessible Ramps SF 1475 B-05 JAIlowance for Unanticipated ADA Improvements LS 1 $ 5,000.00 SUBTOTAL PART B-C-ADA IMPROVEMENTS(B-C1 THRU B-05) Part B-D-DRAINAGE IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-D1 6" Standard Curb and gutter LF 5356 B-D2 5' Curb Inlet EA 13 B-D3 Remove Existing Inlet EA 7 B-D4 Remove Existing Pipe (Up to 24") LF 85 B-D5 Manhole Ring and Cover Adjustment EA 3 B-D6 Storm Manhole (Type 'A') EA 4 B-D7 Tie to Existing Manhole EA 2 B-D8 18" RCP LF 494 B-D9 24" RCP LF 357 B-D10 Trench Safety for Stom Water Pipe LF 851 B-D11 Safety Plan for Manholes and Inlets EA 17 B-D12 Allowance for Unanticipated Drainage Improvements LS 1 $ ;10,000.00 SUBTOTAL PART B-D-DRAINAGE IMPROVEMENTS(B-D1 THRU B-D12) Part B-E-WATER IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-E1 Fire Hydrant, Pipe and Fittings (Type 2) EA 3 B-E2 Extend Fire Hydrant Lead, Replace FH EA 2 B-E3 6" D.I. Water Main LF 125 B-E4 6" D.I. 45° Bend EA 16 B-E5 Valve Box Adjustment EA 10 B-E6 Service Connection Replacement EA 9 B-E7 Trench Safety for Water Main LF 135 B-E8 Allowance for Unanticipated Water Improvements LS 1 $ 5,000.00 SUBTOTAL PART B-E-WATER IMPROVEMENTS(B-E1 THRU B-E8) ADDENDUM INo.2 Bid Form AllACIHIMEN"1'INo.1 PAGE 5 of t1 Page 2 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 Rev 01-13-2016 00 30 01 BID FORM Item DESCRIPTION UNIT ESTIMATED UNIT PRICE EXTENDED QUANTITY AMOUNT BID SUMMARY SUBTOTAL PART B-A-GENERAL(Items B-A1 thru B-A11) SUBTOTAL PART B-B-STREET IMPROVEMENTS (Items B-BI thru B-1317) SUBTOTAL PART B-C-ADA IMPROVEMENTS (Items B-C1 thru B-05) SUBTOTAL PART B-D- DRAINAGE IMPROVEMENTS (Items B-D1 thru B-D12) SUBTOTAL PART B-E-WATER IMPROVEMENTS (Items B-E1 thru B-E8) TOTAL PROJECT BASE BID(B)ASPHALT(PARTS B-A THRU B-E) Contract Times Bidder agrees to reach Substantial Completion in 1 150 Idays Bidder agrees to reach Final Completion in 1 180 Idays ADDENDUM No. 2 Bid Form AIfTA H1 11Lw No,. 1 Page 3 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 PAGE 6 of 6 Rev 01-13-2016 00 30 00 BID ACKNOWLEDGEMENT FORM ARTICLE 1—BID RECIPIENT 1.01 In accordance with the Drawings,Specifications,and Contract Documents,this Bid Proposal is submitted by SE <-oNs mNcn dna SAN i c e-S (type or print name of company)on:Wednesday,lune 28,2017 at 2:00pm,for Ralston Avenue Improvements-Staples to Alameda—Project No. E16271. 1.02 Submit Bids, Bid Security and all attachments to the Bid (See Section 7.01 below)to the City's electronic bidding website at www.CivCastUSA.com. If submitting hard copy bids or bid security in the form of a cashier's or certified check, please send to: The City of Corpus Christi,Texas City Secretary's Office 1201 Leopard Street Corpus Christi,Texas 78401 Attention: City Secretary Bid-Ralston Avenue Improvements-Staples to Alameda—Project No. E16271. All envelopes and packages(including FEDEX envelopes)must clearly identify,on the OUTSIDE of the package,the project name and number and that bid documents are enclosed. ARTICLE 2—BIDDERS'S ACKNOWLEDGMENTS 2.01 Bidder proposes and agrees,if this Bid is accepted,to enter into an Agreement with Owner on the form included in the Contract Documents,to perform all Work specified or indicated in Contract Documents for the Contract Price indicated in this Bid or as modified by Contract Amendment. Bidder agrees to complete the Work within the Contract Times established in the Agreement or as modified by Contract Amendment and comply with the all other terms and conditions of the Contract Documents. 2.02 Bidder accepts all of the terms and conditions of SECTION 00 2113 INVITATION AND INSTRUCTIONS TO BIDDERS, including those dealing with required Bonds. The Bid will remain subject to acceptance for 90 days after the opening of Bids. 2.03 Bidder accepts the provisions of the Agreement as to liquidated damages in the event of its failure to complete Work in accordance with the schedule set forth in the Agreement. 2.04 Bidder acknowledges receipt of the following Addenda: Addendum No. Addendum Date. ,Signature Acknowledging Receipt Bid Acknowledgement Form 00 30 00-1 Ralston Avenue Improvements-Staples to Alameda—Project No.E16271. Rev 01-13-2016 T r ARTICLE 3—BIDDER'S REPRESENTATIONS 3.01 The Bidder has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. 3.02 The Bidder has visited the Site and become familiar with and is satisfied as to the general,local, and Site conditions that may affect cost, progress,and performance of the Work. 3.03 The Bidder is familiar with Laws and Regulations that may affect cost,progress,and performance of the Work. 3.04 The Bidder has carefully studied the following Site-related reports and drawings as identified in the Supplementary Conditions: A. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; B. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; C. Underground Facilities referenced in reports and drawings; D. Reports and drawings relating to Hazardous Environmental Conditions,if any,at or adjacent to the Site;and E. Technical Data related to each of these reports and drawings. 3.05 The Bidder has considered the: A. Information known to Bidder; B. Information commonly known to contractors doing business in the locality of the Site; C. Information and observations obtained from visits to the Site;and D. The Contract Documents. 3.06 The Bidder has considered the items identified in Paragraphs 3.04 and 3.05 with respect to the effect of such information,observations,and documents on: A. The cost,progress,and performance of the Work; B. The means,methods,techniques,sequences,and procedures of construction to be employed by Bidder;and C. Bidder's safety precautions and programs. 3.07 Based on the information and observations referred to in the preceding paragraphs,Bidder agrees that no further examinations,investigations,explorations,tests,studies,or data are necessary for the performance of the Work at the Contract Price,within the Contract Times,and in accordance with the other terms and conditions of the Contract Documents. 3.08 The Bidder is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. Bid Acknowledgement Form 003000-2 Ralston Avenue Improvements-Staples to Alameda—Project No.E16271. Remi-13.2016 3.09 The Bidder has correlated the information known to the Bidder, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents,and all additional examinations,investigations,explorations,tests,studies,and data with the Contract Documents. 3.10 The Bidder has given the OAR written notice of all conflicts,errors,ambiguities,or discrepancies that the Bidder has discovered in the Contract Documents,and the written resolution provided by the OAR is acceptable to the Bidder. 3.11 The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. 3.12 Bidder's entry into this Contract constitutes an incontrovertible representation by Bidder that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. ARTICLE 4—BASIS OF BID 4.01 Bidder will complete the Work in accordance with the Contract Documents at the unit prices shown in the BID FORM. A. Extended amounts have been computed in accordance with Paragraph 13.03 of the General Conditions. B. Bidder acknowledges that the estimated quantities are not guaranteed,and final payment for all Unit Price items will be based on actual quantities provided, measured as provided in the Contract Documents. C. Unit Price and figures column will be used to compute the actual Bid price. ARTICLE 5—EVALUATION OF BIDDERS 5.01 The contract may be awarded either to the lowest responsible bidder or to the bidder who provides the best value for the Owner. The Owner will consider the amount bid,the Bidder's responsibility,the Bidder's safety record,the Bidder's indebtedness to Owner and whether the Bidder has met the minimum specific project experience requirements to determine the lowest responsible Bidder.The Owner reserves the right to waive any and all irregularities in determining the Bidders' responsibility or value,and whether the Bidder has met the minimum specific project experience requirements,and reserves the right to require the submission of additional information. 5.02 The Owner has the right to accept a Bid, reject any and all Bids,to waive any and all irregularities in the Bids,or to reject non-conforming,non-responsive or conditional Bids. in addition,the Owner reserves the right to reject any Bid where circumstances and developments have, in the opinion of the Owner,changed the responsibility of the Bidder. 5.03 Material misstatements in the documentation submitted to determine the Bidder's responsibility,including information submitted per SECTION 00 4516 STATEMENT OF EXPERIENCE,may be grounds for rejection of the Bidder's Bid on this Project. Any such misstatement,if discovered after award of the Contract to such Bidder,may be grounds for immediate termination of the Contract. Additionally,the Bidder will be liable to the Owner for Bid Acknowledgement Form 003000-3 Ralston Avenue Improvements-Staples to Alameda—Project No.E16271. Rev 01-13-2016 any additional costs or damages to the Owner resulting from such misstatements,including costs and attorney's fees for collecting such costs and damages. ARTICLE 6—TIME OF COMPLETION 6.01 Bidder will complete the Work required to be substantially completed within 150 days after the date when the Contract Times commence to run as provided in Paragraph 4.01 of the General Conditions. Bidder will complete the Work required for final payment in accordance with Paragraph 15.06 of the General Conditions within 180 days after the date when the Contract Times commence to run. 6.02 Bidder agrees that the Work will be substantially complete and will be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within the number of days indicated. ARTICLE 7—ATTACHMENTS TO THIS BID 7.01 In compliance with the Bid Requirements in SECTION 00 2113 INVITATION TO BID AND INSTRUCTIONS TO BIDDERS,the following are made a condition of this Bid: A. Bid Security. B. SECTION 00 30 00 BID ACKNOWLEDGEMENT FORM and documentation of signatory authority. C. SECTION 00 30 01 BID FORM. D. SECTION 00 30 02 COMPLIANCE TO STATE LAW ON NONRESIDENT BIDDERS. E. SECTION 00 30 05 DISCLOSURE OF INTEREST. F. SECTION 00 30 06 NON-COLLUSION CERTIFICATION. ARTICLE 8—DEFINED TERMS 8.01 The terms used in this Bid have the meanings indicated in the General Conditions and the Supplementary Conditions. The significance of terms with initial capital letters is described in the General Conditions. ARTICLE 9—VENUE 9.01 Bidder agrees that venue shall lie exclusively in Nueces County,Texas for any legal action. ARTICLE 10—SIGNATORY REQUIREMENTS FOR BIDDERS 10.01 Bidders must include their correct legal name,state of residency,and federal tax identification number in the Bid Form. 10.02 The Bidder,or the Bidder's authorized representative,shall sign and date the Bid Form to accompany all materials included in the submitted Bid. Bids which are not signed and dated in this manner,or which do not contain the required documentation of signatory authority may be rejected as non-responsive. The individual(s)signing the Bid must have the authority to bind the Bid Acknowledgement Form 003000-4 Ralston Avenue Improvements-Staples to Alameda—Project No.E16271. Rev 01-13-2016 r ' 1� Bidder to a contract,and if required,shall attach documentation of signatory authority to the Bid Form. 10.03 Bidders who are individuals("natural persons"as defined by the Texas Business Organizations Code§1.002), but who will not be signing the Bid Form personally,shall include in their bid a notarized power of attorney authorizing the individual designated as their authorized representative to submit the Bid and to sign on behalf of the Bidder. 10.04 Bidders that are entities who are not individuals shall identify in their Bid their charter or Certificate of Authority number issued by the Texas Secretary of State and shall submit with their Bid a copy of a resolution or other documentation approved by the Bidder's governing body authorizing the submission of the Bid and designating the individual(s)authorized to execute documents on behalf of the Bidder. Bidders using an assumed name(an"alias")shall submit a copy of the Certificate of Assumed Name or similar document. 10.05 Bidders that are not residents of the State of Texas must document their legal authority to conduct business in Texas. Nonresident Bidders that have previously registered with the Texas Secretary of State may submit a copy of their Certificate of Authority. Nonresident Bidders that have not previously registered with the Texas Secretary of State shall submit a copy of the Bidder's enabling documents as filed with the state of residency,or as otherwise existing. Bid Acknowledgement Form 003000-5 Ralston Avenue Improvements-Staples to Alameda—Project No.E16271. Rev 01-13-2016 ARTICLE 11-BID SUBMITTAL 11.01 This Bid is submitted by: Bidder: -5-6 C 0„J S TYa.%, C—'+A" (typed or printed full legal name of Bidder) (individual's signature) Name: 6r,.,,r,�,T brc�-sem (typed or printed) Title: >>M (typed or printed) Attest: `�"�� (individual's signature) State of Residency: Federal Tax Id.No. 32- to 316.8 o5 9 Address for giving notices: 113n!2 c,Foe tgo sr. u.A,/T Er Phone: &SO39r33 -050 f Email: grm�-&O-jpe5 .e c (Attach evidence of authority to sign if the authorized individual is not the Bidder,but an individual signing on behalf of another individual Bidder,or if the authorized individual is a representative of a corporation,partnership,or joint venture.) END OF SECTION Bid Acknowledgement Form 003000-6 Ralston Avenue Improvements-Staples to Alameda-Project No.E16271. Rev 01-13-2016 Y 00 30 01 BID FORM Project Name: Ralston Avenue Improvements-Staples to Alameda Project Number: E16271 Owner: City of Corpus Christi Bidder: N OAR: Designer:I Urban Engineering Basis of Bid ESTIMATED EXTENDED DESCRIPTION UNIT UN(TPRKE` QUANTITY 3 AMOUNt Base Bid-(A)CONCRETE Part A-A-General(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-Al Mobilization LS 1 A-A2 Bonds&Insurance LS 1 ; A-A3 Ozone Action Days DAY 3 A-A4 Traffic Control Plan Mobilization/Adjustments LS 1 A-AS ITraffic Conrol BMPs(Barrels,Cones,Etc) MO 5 A-A6 Clear R.O.W. AC 3 A-A7 SWPPP LS 1 A-A8 Silt Fence LF 500 A-A9 Inlet Protection EA 14 OC / A-A10 Sod SY 2900 piy A-All I Door Hangers, Printed and Delivered (2 Ea) LS SUBTOTAL PART A-A-GENERAL(Items A-Al thru A-Ail) Part A-B-STREET IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-B1 6"Jointed Reinforced Concrete Pavement SY 8160 5 , x/. 7096y A-132 Lime Stabilized Subgrade(7.5%by Weight) SY 9170 �g A-83 12"Compacted Subgrade SY 9170 A-134 HMAC Pavement Transitions SY 90 A-65 Salvage and Remove Existing Pavement SY 7289 V Z A-66 Concrete Driveway SF 14870 A-B7 Roadway Excavation SY 7289 eJ A-B8 Curb and Gutter Removal LF 5210 , . A-B9 Sidewalk Removal SF 18550 Al , t A-B10 Driveway Removal SF 14870 04 A-Bll Street Sign Assembly 9" Blades and Stop Sign EA 6 A-612 Other Regulatory Signs EA 1 'jc/Q " gyp A-B13 Allowance for Unanticipated Street Improvements LS 1 $ :20s00000 SUBTOTAL PART A-B-STREET IMPROVEMENTS(Items A-Bl thru A-613) ADDENDUM No.2 Bid Form ATTACHMENT No.1 Page 1 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No.E16271 PAGE 1 of 6 Rev 01-13-2016 r 00 30 01 BID FORM ESTIMATED EXTENDED (tem DESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT Part A-C-ADA IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-C1 Concrete Sidewalk SF 22706 &,;)";L A-C2 RAP or Select Backfill Under Sidewalk/Driveway SY 3210 .3 D A-C3 Sidewalk Retaining Curb LF 100 pO A-C4 Accessible Ramps SF 1475 A-05 Allowance for Unanticipated ADA Improvements LS 1 $ 5,000.00 1a60 SUBTOTAL PART A-C-RTA IMPROVEMENTS(Items A-C1 thru A-CS) Part A-D-DRAINAGE IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-Di 6"Standard Curb LF 5356 7 '441 A-D2 S'Curb Inlet EA 13 A-D3 Remove Existing Inlet EA 7 A-D4 Remove Existing Pipe(Up to 24") LF 85 1` A-D5 Manhole Ring and Cover Adjustment EA 3 9`, A-D6 Storm Manhole(Type'A') EA 4 G r. A-D7 Tie to Existing Manhole EA 2 Z 3 A-D8 18"RCP LF 494 A-D9 24"RCP LF 357 A-D10 Trench Safety for Storm Water Pipe LF 851 A-D11 Safety Plan for Manholes and Inlets EA 17 (; Q A-D12 Allowance for Unanticipated Drainage Improvements LS 1 $ 10,000.00 O O. -7idSUBTOTAL PART A-D-DRAINAGE IMPROVEMENTS(A-D1 THRU A-D12) Part A-E-WATER IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) A-El Fire Hydrant,Pipe and Fittings(Type 1) EA 3 Q$ A-E2 Extend Fire Hydrant Lead,Replace FH EA 2 A-E3 6"D.I.Water Main LF 125 .` A-E4 6"D.I.45°Bend EA 16 ;•2 A-E5 Valve Box Adjustment EA 101/2 A-E6 Service Connection Replacement EA 9 ' A-E7 Trench Safety for Water Main LF 135 A-E8 Allowance for Unanticipated Water Improvements LS 1 is $,000.00 SUBTOTAL PART A-E-WATER IMPROVEMENTS(A-El THRU A-E8) '' ADDENDUM No.2 ATTACHMENT No.l Bid Form PAGE 2 of 6 Page 2 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No.E16271 Rev01-13-2016 r ` 00 30 01 BID FORM }IteMDESCR[PTtON ' UNIT UIiT PRICE QUANTITY 4M0UNT BID SUMMARY SUBTOTAL PART A-A-GENERAL(Items A-Al thru A-All) SUBTOTAL PART A-B-STREET IMPROVEMENTS(Items A-B1 thru A-B13) SUBTOTAL PART A-C-ADA IMPROVEMENTS(Items A-C1 thru A-05) xry SUBTOTAL PART A-D-DRAINAGE IMPROVEMENTS(Items A-D1 thru A-D12) t r r SUBTOTAL PART A-E-WATER IMPROVEMENTS(Items A-E1 thru A-E8) TOTAL PROJECT BASE BID(A)CONCRETE-(PARTS A-A THRU A-E) Contract Times Bidder agrees to reach Substantial Completion in 1 150 Idays Bidder agrees to reach Final Completion in 1 180 Idays ADDENDUM No.2 Bid Form ATTACHMENT No.l PAGE 3 of 6 Page 3 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No. E16271 Rev 01-13-2016 '00 30 01 BID FORM Project Name: Ralston Avenue Improvements-Staples to Alameda Project Number: E16271 Owner: City of Corpus Christi Bidder OAR: Designer: Urban Engineering Basis of Bid ESTIMATED EXTENDED 1tE111 DESCRIPTION UNIT QUANTITY PRICE AIHIO.UNT Base Bid-(B)ASPHALT Part B-A-General(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-A1 Mobilization LS B-A2 Bonds&Insurance LS B-A3 Ozone Action Days DAY 3 �pq B-A4 Traffic Control Plan Mobilization/Adjustments LS 1 B-AS Traffic Control BMPs(Barrels,Cones, Etc) MO 5 ' B-A6 Clear R.O.W. AC 3 B-A7 5WPPP LS 1 82 . ' B-A8 Silt Fence LF 500 ppm B-A9 llnlet Protection EA 14 p , B-A10 ISod SY 2900 B-All IDoor Hangers,Printed and Delivered(2 Ea) LS 1 SUBTOTAL PART B-1-GENERAL(Items B-Bl thru B-B11) IZ4 t Part B-B-STREET IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-B1 2" HMAC(Type'D') SY 7289 (, , B-B2 Prime Coat(0.15 Gal/SY) GAL 1100 B-B3 Limestone Base(Type A, Grade 1-2)(6" Min) SY 9170 B-134 Geogrid(TX-5) SY 9170 Q B-BS 12"Compacted Subgrade 5Y 9170 B-B6 HMAC Pavement Transitions SY 90 B-B7 Salvage and Remove Existing Pavement SY 7289 , B-B8 Concrete Driveway SF 14870 Jo B-B9 Roadway Excavation SY 7289 *41 �r y r8 B-1310 Curb and Gutter Removal LF 5210 B-B11 Sidewalk Removal SF 18550 B-B12 Driveway Removal SF 14870 Gp: ► B-B13 Street Sign Assembly 9" Blades and Stop Sign EA 6 B-1314 Other Regulatory Signs EA 1 B-B15 Allowance for Unanticipated Street Improvements LS 1 $ ;20,OOO.00 SUBTOTAL PART B-B-STREET IMPROVEMENTS(Items B-BI thru B-B15) ADDENDUM No.2 Bid Form ATTACHMENT No.l Page 1 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No.E16271 PAGE 4 of 6 Rev 01-13-2016 00 30 01 BID FORM ESTIMATED r ;EXTENBED Itenrt BESCRIPTION UNIT QUANTITY UNIT PRICE AMOUNT Part B-C-ADA IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-C1 Concrete Sidewalk SF 22706 2 t f..'a00, ;; B-C2 RAP or Select Backfill Under Sidewalk SY 3210 B-0 Sidewalk Retaining Curb LF 100 B-C4 Accessible Ramps SF 1475 K Rqo S -f B-05 Allowance for Unanticipated ADA Improvements LS 1 $ ;,5,000.00 SUBTOTAL PART B-C-ADA IMPROVEMENTS(B-Cl THRU B-CS) �at3 9 Part B-D-DRAINAGE IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-D1 6"Standard Curb and gutter LF 5356 B-D2 5'Curb Inlet EA 13 B-D3 Remove Existing Inlet EA 7 pti: B-D4 Remove Existing Pipe(Up to 24") LF 85 , B-D5 Manhole Ring and Cover Adjustment EA 3 B-D6 Storm Manhole(Type'A') EA 4 B-D7 Tie to Existing Manhole EA 2 B-D8 18" RCP LF 494 B-D9 24" RCP LF 357 !fit. 66 B-D10 Trench Safety for Stom Water Pipe LF 851 B-D11 Safety Plan for Manholes and Inlets EA 17je ; B-D12 Allowance for Unanticipated Drainage Improvements LS 1 $ 10;000.00 /d'O SUBTOTAL PART B-D-DRAINAGE IMPROVEMENTS(B-Dl THRU B-D12) _ Part B-E-WATER IMPROVEMENTS(per SECTION 0129 01 MEASUREMENT AND BASIS FOR PAYMENT) B-El Fire Hydrant, Pipe and Fittings(Type 2) EA 3 ... B-E2 Extend Fire Hydrant Lead,Replace FH EA 2 B-E3 6" D.I.Water Main LF 125 B-E4 6" D.I.45°Bend EA 16 r 's B-E5 Valve Box Adjustment EA 10 B-E6 Service Connection Replacement EA 9 B-E7 Trench Safety for Water Main LF 135 B-E8 lAllowance for Unanticipated Water Improvements LS 1 $ 5;000.00 EJ40 SUBTOTAL PART B-E-WATER IMPROVEMENTS(B-El THRU B-ES) ADDENDUM No.2 Bid Form ATTACHMENT No.i PAGE 5 of 6 Page 2 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No.E16271 Rev 01-13-2016 O r "00 30 01 BID FORM 1t81�1 ! ESTIMATED-DESCRIPTION, UNIT.` UNIT PRICE ESTIMATED EXPENDED gUANI ITY AMOUNT BID SUMMARY SUBTOTAL PART B-A-GENERAL(Items B-A1 thru B-A11) SUBTOTAL PART B-B-STREET IMPROVEMENTS(Items B-B1 thru B-B17) 5= SUBTOTAL PART B-C-ADA IMPROVEMENTS(Items B-Cl thru B-05) Z :^ fa SUBTOTAL PART B-D-DRAINAGE IMPROVEMENTS(Items B-D1 thru B-D12) SUBTOTAL PART B-E-WATER IMPROVEMENTS Items B-E1 thru B-E8 TOTAL PROJECT BASE BID(B)ASPHALT(PARTS B-A THRU B-E) j'- _ � Contract Times Bidder agrees to reach Substantial Completion in 150 Idays Bidder agrees to reach Final Completion in 1 180 Idays ADDENDUM No.2 Bid Form ATTACHMENT No.l Page 3 of 3 Ralston Avenue Improvements-Staples to Alameda-Project No.E16271 PAGE 6 of 6 Rev 01.13-2016 tl � O \ Y 00 30 02 COMPLIANCE TO STATE LAW ON NONRESIDENT BIDDERS Chapter 2252 of the Texas Government Code applies to the award of government contract to nonresident bidders. This law provides that: "a government entity may not award a governmental contract to a nonresident bidder unless the nonresident underbids the lower bid submitted by a responsible resident bidder by an amount that is not less than the amount by which a resident bidder would be required to underbid the nonresident bidder to obtain a comparable contract in the state in which the nonresident's principal place of business is located." "Nonresident bidder"refers to a person who is not a resident of Texas. "Resident bidder" refers to a person whose principal place of business is in this state,including a contractor whose ultimate parent company or majority owner has its principal place of business in this state. Check the statement that is correct for Bidder. O Bidder qualifies as a nonresident bidder whose principal place of business or residency is in the State of M,O�Bidder(includes parent company or majority owner)qualifies as a resident bidder whose principal place of business is in the State of Texas. The Owner will use the information provided in the State of Texas Comptroller's annual publication of other states' laws on contracts to evaluate the Bids of nonresident Bidders. Bidder: Company Name: (typed or printed) By: ...............-- -�� (signature—attac evidence of authority to sign) Name: (typed or printed) Title: Business address: 77 48WO Phone: � t��433^ rfl Email: Q,r.mn -ca i ec s •c [ END OF SECTION Compliance to State Law on Nonresident Bidders 00 30 02-1 Ralston Avenue Improvements-Staples to Alameda—Project No.E16271 11-25-2013 A 1 O ► t 00 30 05 City of Corpus Christi Disclosure of Interest SUPPLIER NUMBER TO BE ASSIGNED BYCTrY— PURCHASING DIVISION ww City of CITY OF CORPUS CHRISTI Corpus DISCLOSURE OF INTEREST Christi City of Corpus Christi Ordinance 17112,as amended,requires all persons or firms seeking to do business with the City to provide the following information. Every question must be answered. If the question is not applicable, answer with "NA". See reverse side for Filing Requirements, Certifications and definitions. COMPANY NAME: P.O.BOX: STREET ADDRESS: J13©a EbP m-w S!`. CITY: Gca"y5 Cit US,,7 ZIP: -#6W4D UW T FIRM IS: I. Corporation 82. Partnership 3. Sole Owner F-14. Association 5. Other ff If additional space is necessarDISCLOSURE QUESTIONS y,please use the reverse side of this page or attach separate sheet. 1. State the names of each `employee" of the City of Corpus Christi having an "ownership interest" constituting 3%or more of the ownership in the above named"firm." Name Job Title and City Department(if known) 2. State the names of each "official" of the City of Corpus Christi having an "ownership interest" constituting 3%or more of the ownership in the above named"firm." Name Title 3. State the names of each"board member"of the City of Corpus Christi having an "ownership interest" constituting 3%or more of the ownership in the above named"firm." Name Board,Commission or Committee 4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who worked on any matter related to the subject of this contract and has an "ownership interest" constituting 3%or more of the ownership in the above named"firm." Name Consultant City of Corpus Christi 003005-1 Disclosure of Interest Rev 01-13-2016 o FILING REQUIREMENTS If a person who requests official action on a matter knows that the requested action will confer an economic benefit on any City official or employee that is distinguishable from the effect that the action will have on members of the public in general or a substantial segment thereof,you shall disclose that fact in a signed writing to the City official,employee or body that has been requested to act in the matter, unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2-349(d)] CERTIFICATION I certify that all information provided is true and correct as of the date of this statement,that I have not knowingly withheld disclosure of any information requested; and that supplemental statements will be promptly submitted to the City of Corpus Christi,Texas as changes occur. Certifying Person: G,L"ftjT 1 tk-rzE Title: AJ (Type or Print) Signature of Certifying ,�'.�, ��;� Date: P . Z , DEFINITIONS a. "Board member." A member of any board, commission, or committee appointed by the City Council of the City of Corpus Christi,Texas. b. "Economic benefit'. An action that is likely to affect an economic interest if it is likely to have an effect on that interest that is distinguishable from its effect on members of the public in general or a substantial segment thereof. c. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part- time basis,but not as an independent contractor. d. "Firm." Any entity operated for economic gain,whether professional,industrial or commercial,and whether established to produce or deal with a product or service,including but not limited to,entities operated in the form of sole proprietorship, as self-employed person, partnership, corporation,joint stock company,joint venture, receivership or trust, and entities which for purposes of taxation are treated as non-profit organizations. e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager, Assistant City Managers,Department and Division Heads,and Municipal Court Judges of the City of Corpus Christi,Texas. f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a firm, including when such interest is held through an agent, trust, estate, or holding entity. "Constructively held" refers to holdings or control established through voting trusts, proxies, or special terms of venture or partnership agreements." g. "Consultant."Any person or firm, such as engineers and architects, hired by the City of Corpus Christi for the purpose of professional consultation and recommendation. City of Corpus Christi 003005-2 Disclosure of Interest Rev 01-13-2016 0 s 4 T 00 30 06 NON-COLLUSION CERTIFICATION STATE OF TEXAS COUNTY OF NUECES OWNER: City of Corpus Christi,Texas 1201 Leopard Street Corpus Christi,Texas 78401 CONTRACT: Ralston Avenue Improvements-Staples to Alameda Project No.E16271 Bidder certifies that the it has not been a party to any collusion among Bidders in the restraint of freedom of competition by agreement to submit a Bid at a fixed price or to refrain from bidding;or with any official or employee of the Owner as to quantity,quality,or price in the prospective contract,or any other terms of said prospective contract;or in any discussion between Bidders and any official of the Owner concerning exchange of money or other thing of value for special consideration in the letting of a contract. Company Name: -3E coN s'rrLv c.Ti onN 5ezv ice< (typed or printed) By: (signature—attach evidence of authority to sign) Name: (typed or printed) Title: p�1 Business address: P38troll 7— Phone: Phone: 660/ Email: Q,.�, j-u� r P e-S .r c END OF SECTION Non-Collusion Certification 00 30 06-1 Ralston Avenue Improvements-Staples to Alameda—Project No.E16271 11-25-2013 B'id Bond SURETY DEPARTMENT Conforms with the American Institute of Architects, A.I.A Documents No. A-310 KNOW ALL MEN BYTHESE M'SENTS, That we, JE Construction Set-vices, LLC as Principal hereinafter called the Principal, and U.S. Specialty Insurance Company a corporation created and existing under the laws of the State of TX whose principal office is in— Houston.TX —as Surety, hereinafter called the Surety, are held and firmly bound unto City of Corpus Christi as Obligee, hereinafter called the Obli-ce, in the surn of five Percent of the Greatest Amount Bid Dollars (S5(Yo GAB) for the payment of which surn, well and truly to be made, the said Principal and the said Surety, bind Ourselves, Our heirs, executors, administrators, successors an(] assigns,jointly and severally, firmly by these presents Whereas, the Principal has submitted a bid lm- Ralston Aventic Irriprovirients NOW,TITEREF'ORE, ifthe Obligee shall accept the bid ofthe Principal and the Principal shall enter into a contract with the Obligee in accordance with the terms of such bid, and give such bond oi-bonds as may be specified in the bidding Or contract documents with ood and sufficient suret l 9 y for the I'aithful pertOrmance Of Such contract and for the prompt payment of labor and material fitirnished in the prosecution thereof, or in the event ofthe failure ofthe Principal to euter SLIC11 contract and give Such bond or bonds, ifthe Principal shall pay to the Obligee the difference not to exceed the penalty hereof between the amount specified in said bid and such larger aniount for which the Obligec may in good Iaith contract with another party to perform the work covered by said bid,then this obligation sliall be null and void,otherwise to rernain in full force and efTect Signed and scale([this 28th (lay of june, 2017 JE Construction Services, LLC (Principal) By _(SEAL) .U.S. Specialtv Insurance Companv (Surety) By (-Vo" (SEAL) Robert G. Kanuth Attorney-in-fact POWER OF ATTORNEY AhlEitlCAlw CON'I'IIhC:'t'ORS Itil)1^"tM,Nl'1`YCOMI'AN, TEXAS BONDING COMPANY UNI't'El)S'rA,rLs SInRE'l-Y C:OMI'ANY U.S.SPECIALTY INSURANCE COMPANY KNOW ALL NlliN BY THESE PRESENTS: That American Contractors Indemnity Company, a California corporation, Texas Bonding Company, an assumed name of American Contractors Indemnity Company, United. States Surety Company, a Maryland corporation and U.S. Specialty Insurance Company, a'f'cxas corporations (collectively, the'*Companies"),do by these presents Boake, constitute and appoint: Johnny Moss,Jay Jordan,'['ony Herro,Jeremy Barnett,.lade['orter,Mistic Beek, Robert G.'Kanuth or Jarrett Willson of Rockwall,'1'exas its true and lawful Attorney(s)-in-fact,each in their separate capacity if'more than one is named,above, with full power and,authority hereby conferred in its name,place and stead.,to execute,acknowledge and deliver any and all bonds,recognizances,undertakings or other instruments or contracts of suretyship-to include riders, amendments, and consents of surety, providing the bund penalty does not exceed * * * **"1'c,n Million* * * ** * * Dollars ($ **10,000,000.00* j. This Power of Attorney shall expire without further action on November 3,2019, '['Isis Power of Attorney is granted under and by authority of the following resolutions adopted by the Boards of Directors of the Companies: Be it Resolved, that the President,airy%w icc-Presidcrit,airy Assistant 'Vice-president,any Secretary or any Assistant Secretary shall be and is hereby vested with gull power and authority to appoint tiny one or mare suitable,persons as Auorne.y(s)-in-iaact to represent and act for and on behalf cat"the Company subject to the following provisions; lttorrrt.yr-ire-t'ritt may be given full power and authority for and in the nansc of and on behalf of the,Company,to execute,acknowledge and deliver,any and all bonds, recognizrances, contracts, agreements or indemnity and other conditional or obligatory undertakings, including any and all consents for the release ofretained percentages and/or final estimates can engineering and construction contracts, and any and all notices and documents canceling or terminating the Company's liability thereunder,and any such instruments so executed by any such Attorrie;y-in-Fact shall be,binding upon the.Company as if signed by the President and scaled and effected by the:Corporate,Secretary, Be,itflesolved,that the,signature of any authorizedofficer and scial of the Company heretofore or hereafter affixed to any power ofattorney or any certificate relating.. thereto by fracsitaile,and any power of attorney or certificate hearing;facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached, IN WITNESS WFIE REOF,The Companies have caused this instrument to be signed and their corporate seals to be hereto affixed;this I st day of November,2016. Ai'4mk RICAN CONTRACT ORS IN1)EMNI'I'Y CC)MPANY TEXAS BONDING COMPANY Corporate Seats UNI I I D S rA'I`ES SUIT I V CONII'ANY U.S.SPEC:IAI,ry INSI)RANC E COMPANY By: _ gr W sad ,ltcrrutrwu 1 �� 42 xaaaen . nllt r*5enttDa1CAl a � .•..seax ay M ,cis. v A notary public or other officer coinplef]ng this certificate verifies only tlae identify orthe individual who signed the document which this certificate is attached,and not the truthfulness,accuracy,or validity of that docutncnt, State.of California County of Los Angeles SS: On this Ist clay of November,2016, before me,,Sabina Morgenste:in,a notary public, personally appeared Daniel I',Aguilar,trice President of` American ContractorsIndemnity C:ornpansy,"texas Bonding Company,United States Surety Company and U.S.Specialty Insurance Company who proved to me ora the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to ire that lie executed the same in his authorized capacity,and that by his signature on the instrument tete person,or the entity upon behalf of tfrhich the person acted,executed the:instrument, I certify under PENAun,OF PERJURY tinder the laws of the State of California that the foregoing paragraph is title and correct. WITNESS my]laud and official seal. SABINA M0[IGENSTEIN Commission# 2129258 Signature + ` � Notary Public California Los Angeles County My Comm.Expires Nov 3,2010 I,Kici I.ci Assistant Secretary of Atne°ricans Cciritrat,fcars indemnity C"t>nnlsany Cr:xas Bonding Company,United States Surety Company and U3, Specialty Indiunance Company,do hereby certify that the;above and foregoing is a trate and correct copy ol'a Power of"Anorney,executed by said Companies,which is still in frill force and ef'feet; forthennore,the resolutions ofthe Boards of Directors,set out in the Power ofAttonsey are in fill] 1 , force and e�seffect, heraf;1 have h -eta o set my hand and affixed the nerals of`staid Companies at Less Angeles,C;alifortsia this_ dray of . • Coil rate Seals ���irxoar�r ph�s's�R�x �ozaiio co ��wt�waa,» � wn^w xra�No. ^&*7,,„. `rte "�. q.A. -.,...,... k,io Lo,A,ssistant ✓eeiY"G"r-aI”Bon „ Agency C), � a w � � _ Is —AL'� " ' y �,�;r �,%%% "]t142 r s. � r or c �o 1 � e Mo- � m Yo° too ioaS a c I o Ob mW = U �cnti i � ! � m T°gmim i E a.Eii� �p- cm t 3n a � oa aci� 9 U i i i tet. .... U.S. Specialty Insurance Company TEXAS COMPLAINT NOTICE IMPORTANT NOTICE AVISO IMPORTANTE 1. To obtain information or make a complaint: Para obtener informacion o para someter una queja: 2. You may contact your agent. Puede comunicarse con su agente. 3. You may call the company's toll free telephone Usted puede hamar al numero de telefono gratis number for information or to make a complaint at: de la compania's para informacion o para someter una queja al: 1-800-486-6695 1-800-486-6695 4. You may also write to the company at: Usted tambien puede escribir a la compania: 801 South Figueroa Street, Ste 700 801 South Figueroa Street, Ste 700 Los Angeles, CA 90017 Los Angeles,CA 90017 5. You may contact the Texas Department of Puede comunicarse con el Departamento de Insurance to obtain information on companies, Seguros de Texas para obtener informacion acerca coverages,rights,or complaints at: de companias,coberturas,derechos,o quejas al: 1-800-252-3439 1-800-252-3439 6. You may write to the Texas Department of Puede escribir al Departamento de Seguros de Insurance at: Texas al: Consumer Protection(1 I I-1 A) Consumer Protection(111-1A) P.O. Box 149091 P.O. Box 149091 Austin,TX 78714-9091 Austin,TX 78714-9091 Fax No. (512)490-1007 Fax No. (512)490-1007 Web:http://www.tdi.texas.gov Web: http://www.tdi.state.tx.us E-mail:ConsumerProtectionatdi.texas gov E-mail: ConsumerProtection(a,tdi.texas.gov 7. PREMIUM OR CLAIM DISPUTES: DISPUTAS SOBRE PRIMAS O RECLAMOS: Should you have a dispute concerning your Si tiene una disputa concerniente a su prima o a premium or about a claim you should contact the un reclamo,debe comunicarse con el agente o la agent or the company first. If the dispute is not compania primero. Si no se resuelve la disputa, resolved,you may contact the Texas Department puede entonces comunicarse con el departamento of Insurance. (TDI). 8. ATTACH THIS NOTICE TO YOUR POLICY UNA ESTE AVISO A SU POLIZA This notice is for information only and does not Esta aviso es solo para proposito de informacion y become a part or condition of the attached no se convierte en parte o condicion del document. documento adjunto. HCCSTWO008n0 00 52 23 AGREEMENT This Agreement, for the Project awarded on August 8,2017 is between the City of Corpus Christi (Owner) and JE Construction Services (Contractor). Owner and Contractor agree as follows: ARTICLE 1—WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as: Ralston Avenue Improvements -Staples to Alameda Project No. E16271 ARTICLE 2—DESIGNER AND OWNER'S AUTHORIZED REPRESENTATIVE 2.01 The Project has been designed by: Urban Engineering 2725 Swantner Street Corpus Christi,TX 78404 2.02 The Owner's Authorized Representative for this Project is: Ernesto De La Garza, PE—Construction Management Engineer City of Corpus Christi—Engineering Services 4917 Holly Road,#5 Corpus Christi,TX 78411 ARTICLE 3—CONTRACT TIMES 3.01 Contract Times A. The Work is required to be substantially completed within 150 days after the date when the Contract Times commence to run as provided in the Notice to Proceed and is to be completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions within 180 days after the date when the Contract Times commence to run. B. Milestones, and the dates for completion of each, are as defined in SECTION 0135 00 SPECIAL PROCEDURES. 3.02 Liquidated Damages A. Owner and Contractor recognize that time limits for specified Milestones, Substantial Completion, and completion and readiness for Final Payment as stated in the Contract Documents are of the essence of the Contract. Owner and Contractor recognize that the Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.01 and as adjusted in accordance with Paragraph 11.05 of the General Agreement 005223- 1 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 Conditions. Owner and Contractor also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty): 1. Substantial Completion: Contractor shall pay Owner$1000 for each day that expires after the time specified in Paragraph 3.01 for Substantial Completion until the Work is substantially complete. 2. Completion of the Remaining Work: Contractor agrees to pay Owner$400 for each day that expires after the time specified in Paragraph 3.01 for completion and readiness for final payment until the Work is completed and ready for final payment in accordance with Paragraph 15.06 of the General Conditions. 3. Liquidated damages for failing to timely attain Substantial Completion and Final Completion are not additive and will not be imposed concurrently. 4. Milestones: Contractor agrees to pay Owner liquidated damages as stipulated in SECTION 0135 00 SPECIAL PROCEDURES for failure to meet Milestone completions. 5. The Owner will determine whether the Work has been completed within the Contract Times. B. Owner is not required to only assess liquidated damages, and Owner may elect to pursue its actual damages resulting from the failure of Contractor to complete the Work in accordance with the requirements of the Contract Documents. ARTICLE 4—CONTRACT PRICE 4.01 Owner will pay Contractor for completion of the Work in accordance with the Contract Documents at the unit prices shown in the attached BID FORM. Unit prices have been computed in accordance with Paragraph 13.03 of the General Conditions. Contractor acknowledges that estimated quantities are not guaranteed, and were solely for the purpose of comparing Bids, and final payment for all unit price items will be based on actual quantities, determined as provided in the Contract Documents. Total Base Bid B Price $ 1,453,476.33 ARTICLE 5—PAYMENT PROCEDURES 5.01 Submit Applications for Payment in accordance with Article 15 of the General Conditions. Applications for Payment will be processed by the OAR as provided in the General Conditions. 5.02 Progress Payments; Retainage: A. The Owner will make progress payments on or about the 25th day of each month during performance of the Work. Payment is based on Work completed in accordance with the Schedule of Values established as provided in the General Conditions. B. Progress payments equal to 95 percent of the total earned value to date for completed Work and properly stored materials will be made prior to Substantial Completion. The balance will be held as retainage. Agreement 005223-2 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 C. Payment will be made for the amount determined per Paragraph 5.02.13, less the total of payments previously made and less set-offs determined in accordance with Paragraph 15.01 of the General Conditions. D. At the Owner's option, retainage may be required at a higher percentage rate if progress on the Project is considered to be unsatisfactory. If retainage in excess of the amount described above is held prior to Substantial Completion, the Owner will place the additional amount in an interest bearing account. Interest will be paid in accordance with Paragraph 6.01. E. At the Owner's option, Owner may pay Contractor 100 percent of the Work completed, less amounts withheld in accordance with Paragraph 15.01 of the General Conditions and less 200 percent of OAR's estimate of the value of Work to be completed or corrected to reach Substantial Completion. Owner may, at its sole discretion, elect to hold retainage in the amounts set forth above for progress payments prior to Substantial Completion if Owner has concerns with the ability of the Contractor to complete the remaining Work in accordance with the Contract Documents or within the time frame established by this Agreement. Release or reduction in retainage is contingent upon and consent of surety to the reduction in retainage. 5.03 Owner will pay the remainder of the Contract Price as recommended by OAR in accordance with Paragraph 15.06 of the General Conditions upon Final Completion and acceptance of the Work. ARTICLE 6—INTEREST ON OVERDUE PAYMENTS AND RETAINAGE 6.01 The Owner is not obligated to pay interest on overdue payments except as required by Texas Government Code Chapter 2251. 6.02 The Owner is not obligated to pay interest on moneys not paid except as provided in Texas Government Code Chapter 2252. ARTICLE 7—CONTRACTOR'S REPRESENTATIONS 7.01 The Contractor makes the following representations: A. The Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. The Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. C. The Contractor is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work. D. The Contractor has carefully studied the following Site-related reports and drawings as identified in the Supplementary Conditions: 1. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; 2. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; Agreement 005223-3 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 3. Underground Facilities referenced in reports and drawings; 4. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and 5. Technical Data related to each of these reports and drawings. E. The Contractor has considered the: 1. Information known to Contractor; 2. Information commonly known to contractors doing business in the locality of the Site; 3. Information and observations obtained from visits to the Site; and 4. The Contract Documents. F. The Contractor has considered the items identified in Paragraphs 7.01.D and 7.01.E with respect to the effect of such information, observations, and documents on: 1. The cost, progress, and performance of the Work; 2. The means, methods,techniques, sequences, and procedures of construction to be employed by Contractor; and 3. Contractor's safety precautions and programs. G. Based on the information and observations referred to in the preceding paragraphs, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. H. The Contractor is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. I. The Contractor has correlated the information known to the Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations,tests, studies, and data with the Contract Documents. J. The Contractor has given the OAR written notice of all conflicts, errors, ambiguities, or discrepancies that the Contractor has discovered in the Contract Documents, and the written resolution provided by the OAR is acceptable to the Contractor. K. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. L. Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. ARTICLE 8—ACCOUNTING RECORDS 8.01 Accounting Record Availability: The Contractor shall keep such full and detailed accounts of materials incorporated and labor and equipment utilized for the Work consistent with the requirements of Paragraph 13.01 of the General Conditions and as may be necessary for proper Agreement 005223-4 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 financial management under this Agreement. Subject to prior written notice, the Owner shall be afforded reasonable access during normal business hours to all of the Contractor's records, books, correspondence, instructions, drawings, receipts, vouchers, memoranda, and similar data relating to the Cost of the Work and the Contractor's fee. The Contractor shall preserve all such documents for a period of 3 years after the final payment by the Owner. ARTICLE 9—CONTRACT DOCUMENTS 9.01 Contents: A. The Contract Documents consist of the following: 1. Specifications, forms, and documents listed in SECTION 00 0100 TABLE OF CONTENTS. 2. Drawings listed in the Sheet Index. 3. Addenda. 4. Exhibits to this Agreement: a. Contractor's Bid Form. b. NONE. 5. Documentation required by the Contract Documents and submitted by Contractor prior to Notice of Award. B. There are no Contract Documents other than those listed above in this Article. C. The Contract Documents may only be amended, modified, or supplemented as provided in Article 11 of the General Conditions. ARTICLE 10—CONTRACT DOCUMENT SIGNATURES One original of the signed Agreement will be required. The sequence of signatures will be completed in the following order: A. CONTRACTOR—Agreement must be signed by a person authorized to bind the firm or company. If Contractor is a Corporation, agreements must be Attested; B. ASSISTANT CITY ATTORNEY for the City; C. DIRECTOR OF ENGINEERING SERVICES; D. CITY SECRETARY for the City. Agreement 005223-5 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 ATTEST CITY OF CORPUS CHRISTI oUranNs9nee br yen Eamonas o1an,o.,om,,-s DN. men Ed—a o..-EN,....f bemea=pftye@ene.. s �r '_r. Date-2017 08 24 131121 ns09 Rebecca Huerta J. H. Edmonds, P.E. City Secretary Director of Engineering Services Ord. 031204 AUTHORIZED APPROVED AS TO LEGAL FORM: BY COUNCIL 8/08/17 . Aimee Alcorn-ReedDigitally signed by RH/ML Wed 2017.08.23 17:26:19-05'00' RH/M L Date:2017.08.28 09:49:31 -05'00' Assistant City Attorney ATTEST(IF CORPORATION) CONTRACTOR JE Construction Services (Seal Below) By: Grant �IetZeDN G °=a 2017 08 11 =s��"°""$e"" Note: Attach copy of authorization to sign if Title: VP person signing for CONTRACTOR is not President, Vice President, Chief Executive Officer, or Chief 11309 Leopard St. Unit E Financial Officer Address Corpus Christi, Texas 78410 City State Zip 361/933-0501 Phone Fax grant@jecs.cc EMail END OF SECTION Agreement 005223-6 Ralston Avenue Improvements-Staples to Alameda—Project No. E16271 Rev 06-22-2016 CERTIFICATE OF INTERESTED PARTIES FORM 1295 1011 Complete Nos.I-4 and 6 it there are interested parties, OFFICE USE ONLY Complete Nos.1,2,3,5,and 6 if there are no interested parties. CERTIFICATION OF FILING 1 Name of business entity filing form,and the city,state and country of the business entity's place Certificate Number: of business. 2017-233333 JE Construction Services Corpus Christi,TX United States Date Filed. 2 Name of gov;r;m—en—Q e-nitli-y'or state agency tligt19Tpanty to the contract for Which the form Is 07/0712017 being filed. City of Corpus Christi Date Acknowledged- Ai—Al,--Reed 2017.08.2317:24:55-05'00' 3 Provide the identification number used by the governmental entity or state agency to track or identify the contract,and provide a description of the services,goods,or other property to be provided under the contract E16271 Ralston Avenue Improvements Nature of interest 4 Name of Interested Party City,State,Country(place of business) (check applicable) Controlling Intermedia . 5 Check only If there Is NO Interested Party, LI 6 AFFIDAVITI swear,or affirm,under penalty of perjury,that the above disclosure is true and correct. K KAREN JUST Stolle Of Texas °°:"t NOIOTYP011C, If I-excl, -z A; I MY Commiss Ion ExPlfes in nni 7n October Signature of authorized agent of contrd"RoxzTness entity AFFIX NOTARY STAMP I SEAL ABOVE Sworn�td subscribed before me,by the said this the n, day of 20 10 c hich,witness my hand and seal of office. Signature of . & oath h t Pr aAe@-oNceradministering oath of officer administering Oath g Forms provided by Texas Ethics Commission www.ethics.state.tx.us Version V1.0.883 The ACORD name and logo are registered marks of ACORD CERTIFICATE HOLDER ©1988-2014 ACORD CORPORATION.All rights reserved. ACORD 25 (2014/01) AUTHORIZED REPRESENTATIVE CANCELLATION DATE (MM/DD/YYYY)CERTIFICATE OF LIABILITY INSURANCE LOCJECT PRO-POLICY GEN'L AGGREGATE LIMIT APPLIES PER: OCCURCLAIMS-MADE COMMERCIAL GENERAL LIABILITY PREMISES (Ea occurrence)$DAMAGE TO RENTED EACH OCCURRENCE $ MED EXP (Any one person)$ PERSONAL &ADV INJURY $ GENERAL AGGREGATE $ PRODUCTS - COMP/OP AGG $ $RETENTIONDED CLAIMS-MADE OCCUR $ AGGREGATE $ EACH OCCURRENCE $UMBRELLA LIAB EXCESS LIAB DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required) INSR LTR TYPE OF INSURANCE POLICY NUMBER POLICY EFF (MM/DD/YYYY) POLICY EXP (MM/DD/YYYY)LIMITS PER STATUTE OTH- ER E.L.EACH ACCIDENT E.L. DISEASE - EA EMPLOYEE E.L. DISEASE - POLICY LIMIT $ $ $ ANY PROPRIETOR/PARTNER/EXECUTIVE If yes,describe under DESCRIPTION OF OPERATIONS below (Mandatory in NH) OFFICER/MEMBER EXCLUDED? WORKERS COMPENSATION AND EMPLOYERS' LIABILITY Y / N AUTOMOBILE LIABILITY ANY AUTO ALL OWNED SCHEDULED HIRED AUTOS NON-OWNED AUTOS AUTOS AUTOS COMBINED SINGLE LIMIT BODILY INJURY (Per person) BODILY INJURY (Per accident) PROPERTY DAMAGE $ $ $ $ THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSD ADDL WVD SUBR N / A $ $ (Ea accident) (Per accident) OTHER: THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). COVERAGES CERTIFICATE NUMBER:REVISION NUMBER: INSURED PHONE (A/C, No, Ext): PRODUCER ADDRESS: E-MAIL FAX (A/C, No): CONTACT NAME: NAIC # INSURER A : INSURER B : INSURER C : INSURER D : INSURER E : INSURER F : INSURER(S)AFFORDING COVERAGE SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. INS025 (201401) 8/21/2017 K&S Insurance Agency 2255 Ridge Road, Ste. 333 P. O. Box 277 Rockwall TX 75087 Honey Counts (972)772-7262 (972)771-4695 hcounts@kandsins.com JE Construction Services LLC 11309 Leopard Suite E Corpus Christi TX 78410 FCCI Insurance Group 10178 National Trust Insurance Co.20141 Texas Mutual Insurance Co.22945 Hanover Insurance Co.22292 A X X X GL0018400 11/2/2016 11/2/2017 1,000,000 100,000 10,000 1,000,000 2,000,000 2,000,000 A X X X CA100007275 11/2/2016 11/2/2017 1,000,000 B X X X 10,000 UMB0022190 11/2/2016 11/2/2017 5,000,000 5,000,000 C Y 0001306815 5/17/2017 5/17/2018 X 1,000,000 1,000,000 1,000,000 D Contractors Equipment IHDA75524900 11/2/2016 11/2/2017 Leased/Rented - Max per item 650,000 Leased/Rented-MaxOccurrence 2,000,000 RE: Project E16271 Ralston Avenue Improvements - Staples to Alameda *SEE ATTACHED PAGE* Gary Thompson/COUNTS City of Corpsu Christi Texas Construction Contracts Administrator 1201 Leopard St City Hall Third Floor Corpus Christi, TX 78469-9277 sylviaa@cctexas.com COMMENTS/REMARKS COPYRIGHT 2000, AMS SERVICES INC.OFREMARK *Additional Insured, Waiver of Subrogation & Primary & Non-Contributory forms #CGL088 1013, CGL 084 1013, CGL 025 1108 applies to the General Liability policy. *Additional Insured, Waiver of Subrogation & Primary & Non-Contributory forms CAU 058 0115 and CAU 042 0115 apply to the Auto Liability policy. *Waiver of Subrogation form #WC 420304B 06/14 applies to the Workers Compensation policy. GENERAL LIABLITY Automatic Additional Insured - Any person or organization whom your required to add as such by reason of a written contract or agreement Primary & Non-Contributory where required by a written contract between the named insured and any person or organization that requires such status. Blanket Waiver of Subrogation as required by written contract between the named insured and any person or organization that requires such status. AUTOMOBILE LIABILITY Additional Insured by Contract - Any person or organization that you are required by a written contract to name as additional insured. Blanket Waiver of Subrogation - We waive any right of recovery we may have against any person or organization because of payments we make for "bodily injury" or "property damage" arising out of the operation of a covered "auto" when you have assumed liability for such "bodily injury" or "property damage" under an "insured contract", provided the "bodily injury" or "property damage" occurs subsequent to the execution of the "insured contract". Primary & Non-Contributory where required by a written contract between the named insured and any person or organization that requires such status. WORKERS COMPENSATION Blanket Waiver of Subrogation as required by written contract between the named insured and any person or organization that requires such status. UMBRELLA LIABILITY Umbrella policy follows form per attached policy form UMB024 1108. *ALWAYS REFER TO POLICY FORMS FOR SPECIFIC WORDING OF SUCH COVERAGE, LIMITS, CONDITIONS AND EXCLUSIONS. ACoRD® CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DQIYYYY) 8/22/2017 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(les) must be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER R&S Insurance Agency 2255 Ridge Road, Ste. 333 P . 0. Box 277 Rockwall TX 75087 INSURED JE Construction Services LLC 11309 Leopard Suite E Corpus Christi TX 78410 NAME CT Honey Counts (AICNNo,Ext); HOE (972)771-4071 AX (A/C,No):(972)771-4695 E -MIL ADDRESS: Ahcounts@kandsins.com POLICY EXPM/LIMITS (MM/DDIYYYY) ACCORDANCE WITH THE POLICY PROVISIONS. INSURER(S) AFFORDING COVERAGE NAIC # INSURER A :Navigators Specialty Ins. Co. INSURER B : INSURER C: INSURER D : INSURER E : INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN ISSUED TO CONTRACT THE POLICIES REDUCED BY POLICY EFF (MDDIYYYY) THE INSURED NAMED ABOVE FOR THE OR OTHER DOCUMENT WITH RESPECT DESCRIBED HEREIN IS SUBJECT TO PAID CLAIMS. POLICY PERIOD TO WHICH ALL THE TERMS, THIS INSR TYPE OF INSURANCE ADDL SUBR- LTR INSD WVD POLICY NUMBER POLICY EXPM/LIMITS (MM/DDIYYYY) ACCORDANCE WITH THE POLICY PROVISIONS. COMMERCIAL GENERAL UABIUTY A _ CLAIMS -MADE OCCUR X Pollution Liability CH16ECP305121IC 11/2/2016 EACH OCCURRENCE DAMAGE TO - PREMISES EaEoccu occurrence) . 11/2/2018 MED EXP (Any one person) S 5,000,000 $ 5, $ S S S S 000, 000 - PERSONAL & ADV INJURY GENERAL AGGREGATE PRODUCTS - COMP/OP AGG GE__N'L AGGREGATE LIMIT APPLIES PER: POLICY PRO LOC _ JECT OTHER: - --- - 10,000 Deductible AUTOMOBILE LIABILITY ANY AUTO ALL OWNED SCHEDULED AUTOS AUTOS NON -OWNED HIRED AUTOS AUTOS COMBINED SINGLE LIMIT (Ea accident) BODILY INJURY (Per person) BODILY INJURY (Per accident) PROPERTY DAMAGE (Per accident) $ $ $ $ S UMBRELLA UAB OCCUR EACH OCCURRENCE S S $ EXCESS UAB CLAIMS -MADE AGGREGATE DED RETENTIONS WORKERS COMPENSATION AND EMPLOYERS' LIABILITY Y I N ANY PROPRIETOR/PARTNER/EXECUTIVE N 1 A OFFICER/MEMBER EXCLUDED? (Mandatory in NH) If es. describe under DESCRIPTION OF OPERATIONS below PER TH- STATUTE _ _ER E.L. EACH ACCIDENT S E.L. DISEASE - EA EMPLOYEE S - E.L. DISEASE - POLICY UMIT S DESCRIPTION OF OPERATIONS ! LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached It more space Is required) RE: Project E16271 Ralston Avenue - Staples to Alameda CERTIFICATE HOLDER CANCELLATION sylviaa@cctexas.com SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE City of Corpus Christi Texas THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Construction Contracts Administrator ACCORDANCE WITH THE POLICY PROVISIONS. 1201 Leopard St City Hall, Third Floor AUTHORIZED REPRESENTATIVE Corpus Christi, TX 78469 Gary Thompson/COUNTS ACORD 25 (2014101) INS025 (201401) @ 1988-2014 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD FIRST CHOICE CONTRACTORS LIABILITY ENDORSEMENT TABLE OF CONTENTS DESCRIPTION PAGE Additional Insured Coverage 10 Bail Bonds 9 Blanket Waiver of Subrogation 16 Bodily Injury and Property Damage 1 Care, Custody or Control 3 Contractors Errors and Omissions 7 Contractual Liability (Personal & Advertising Injury) 2 Electronic Data Liability 1 General Liability Conditions 14 Incidental Malpractice 10 Insured 10 Limited Product Withdrawal Expense 4 Limits of Insurance 12 Loss of Earnings 10 Newly Formed or Acquired Organizations 12 Non -Owned Watercraft 1 Property Damage Liability — Borrowed Equipment 1 Tenant's Property and Premises Rented To You 9 Voluntary Property Damage 2 COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. FIRST CHOICE CONTRACTORS LIABILITY ENDORSEMENT This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE FORM NOTE: The following are additions, replacements and amendments to the Commercial General Liability Coverage Form, and will apply unless excluded by separate endorsement(s) to the Commercial General Liability Coverage Form. The COMMERCIAL GENERAL LIABILITY COVERAGE FORM is amended as follows: SECTION I - COVERAGES, COVERAGE A. BODILY INJURY AND PROPERTY DAMAGE is amended as follows: 1. Extended "Property Damage" Exclusion 2.a., Expected or Intended Injury, is replaced with the following: a. "Bodily injury" or "property damage" expected or intended from the standpoint of the insured. This exclusion does not apply to "bodily injury" or "property damage" resulting from the use of reasonable force to protect persons or property. 2. Non -owned Watercraft Exclusion 2.g. (2) (a) is replaced with the following: (a) Less than 51 feet long; and 3. Property Damage Liability — Borrowed Equipment The following is added to Exclusion 2.j. (4): Paragraph (4) of this exclusion does not apply to "property damage" to borrowed equipment while at a jobsite and not being used to perform operations. The most we will pay for "property damage" to any one borrowed equipment item under this coverage is $25,000 per "occurrence". The insurance afforded under this provision is excess over any other valid and collectible property insurance (including deductible) available to the insured, whether primary, excess, contingent or on any other basis. 4. Limited Electronic Data Liability Exclusion 2.p. is replaced with the following: P. Electronic Data Damages arising out of the loss of, loss of use of, damage to, corruption of, inability to access, or inability to manipulate "electronic data" that does not result from physical injury to tangible property. The most we will pay under Coverage A for "property damage" because of all loss of "electronic data" arising out of any one "occurrence" is $10,000. CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 1 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) We have no duty to investigate or defend claims or "suits" covered by this Limited Electronic Data Liability coverage. The following definition is added to SECTION V — DEFINITIONS of the Coverage Form: "Electronic data" means information, facts or programs stored as or on, created or used on, or transmitted to or from computer software (including systems and applications software), hard or floppy disks, CD- ROMS, tapes, drives, cells, data processing devices or any other media which are used with electronically controlled equipment. For purposes of this Limited Electronic Data Liability coverage, the definition of "Property Damage" in SECTION V — DEFINITIONS of the Coverage Form is replaced by the following: 17. "Property damage" means: a. Physical injury to tangible property, including all resulting loss of use of that property. All such loss of use shall be deemed to occur at the time of the physical injury that caused it; b. Loss of use of tangible property that is not physically injured. All such loss of use shall be deemed to occur at the time of the "occurrence" that caused it; c. Loss of, loss of use of, damage to, corruption of, inability to access, or inability to properly manipulate "electronic data", resulting from physical injury to tangible property. All such loss of "electronic data" shall be deemed to occur at the time of the "occurrence" that caused it. For purposes of this insurance, "electronic data" is not tangible property. SECTION I — COVERAGES, COVERAGE B. PERSONAL AND ADVERTISING INJURY LIABILITY is amended as follows: Paragraph 2.e. Exclusions — the Contractual Liability Exclusion is deleted. SECTION I — COVERAGES, the following coverages are added: COVERAGE D. VOLUNTARY PROPERTY DAMAGE 1. Insuring Agreement We will pay, at your request, for "property damage" caused by an "occurrence", to property of others caused by you, or while in your possession, arising out of your business operations. The amount we will pay for damages is described in SECTION III LIMITS OF INSURANCE. 2. Exclusions This insurance does not apply to: "Property Damage" to: a. Property at premises owned, rented, leased or occupied by you; b. Property while in transit; c. Property owned by, rented to, leased to, loaned to, borrowed by, or used by you; CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 2 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) d. Premises you sell, give away, or abandon, if the "property damage" arises out of any part of those premises; e. Property caused by or arising out of the "products -completed operations hazard"; f. Motor vehicles; g. "Your product" arising out of it or any part of it; or h. "Your work" arising out of it or any part of it. 3. Deductible We will not pay for loss in any one "occurrence" until the amount of loss exceeds $250. We will then pay the amount of loss in excess of $250 up to the applicable limit of insurance. 4. Cost Factor In the event of a covered loss, you shall, if requested by us, replace the damaged property or furnish the labor and materials necessary for repairs thereto at your actual cost, excluding profit or overhead charges. The insurance afforded under COVERAGE D is excess over any other valid and collectible property or inland marine insurance (including the deductible applicable to the property or inland marine coverage) available to you whether primary, excess, contingent or any other basis. Coverage D covers unintentional damage or destruction, but does not cover disappearance, theft, or loss of use. The insurance under COVERAGE D does not apply if a loss is paid under COVERAGE E. COVERAGE E. CARE, CUSTODY OR CONTROL 1. Insuring Agreement We will pay those sums that the insured becomes legally obligated to pay as damages because of "property damage" caused by an "occurrence", to property of others while in your care, custody, or control or property of others as to which you are exercising physical control if the "property damage" arises out of your business operations. The amount we will pay for damages is described in SECTION III LIMITS OF INSURANCE. 2. Exclusions This insurance does not apply to: "Property Damage" to: a. Property at premises owned, rented, leased or occupied by you; b. Property while in transit; c. Premises you sell, give away, or abandon, if the "property damage" arises out of any part of those premises; d. Property caused by or arising out of the "products -completed operations hazard"; CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 3 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) e. Motor vehicles; f. "Your product" arising out of it or any part of it; or g. "Your work" arising out of it or any part of it. 3. Deductible We will not pay for loss in any one "occurrence" until the amount of loss exceeds $250. We will then pay the amount of loss in excess of $250 up to the applicable limit of insurance. 4. Cost Factor In the event of a covered loss, you shall, if requested by us, replace the damaged property or furnish the labor and materials necessary for repairs thereto at your actual cost, excluding profit or overhead charges. The insurance afforded under COVERAGE E is excess over any other valid and collectible property or inland marine insurance (including the deductible applicable to the property or inland marine coverage) available to you whether primary, excess, contingent or any other basis. The insurance under COVERAGE E does not apply if a loss is paid under COVERAGE D. COVERAGE F. LIMITED PRODUCT WITHDRAWAL EXPENSE 1. Insuring Agreement a. If you are a "seller", we will reimburse you for "product withdrawal expenses" associated with "your product" incurred because of a "product withdrawal" to which this insurance applies. The amount of such reimbursement is limited as described in SECTION III - LIMITS OF INSURANCE. No other obligation or liability to pay sums or perform acts or services is covered. a. This insurance applies to a "product withdrawal" only if the "product withdrawal" is initiated in the "coverage territory" during the policy period because: (1) You determine that the "product withdrawal" is necessary; or (2) An authorized government entity has ordered you to conduct a "product withdrawal". c. We will reimburse only those "product withdrawal expenses" which are incurred and reported to us within one year of the date the "product withdrawal" was initiated. d. The initiation of a "product withdrawal" will be deemed to have been made only at the earliest of the following times: (1) When you have announced, in any manner, to the general public, your vendors or to your employees (other than those employees directly involved in making the determination) your decision to conduct a "product withdrawal" This applies regardless of whether the determination to conduct a "product withdrawal" is made by you or is requested by a third party; (2) When you received, either orally or in writing, notification of an order from an authorized government entity to conduct a "product withdrawal; or CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 4 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) (3) When a third party has initiated a "product withdrawal" and you communicate agreement with the "product withdrawal", or you announce to the general public, your vendors or to your employees (other than those employees directly involved in making the determination) your decision to participate in the "product withdrawal", whichever comes first. e. "Product withdrawal expenses" incurred to withdraw "your products" which contain: (1) The same "defect" will be deemed to have arisen out of the same "product withdrawal"; or (2) A different "defect" will be deemed to have arisen out of a separate "product withdrawal" if newly determined or ordered in accordance with paragraph 1.b of this coverage. 2. Exclusions This insurance does not apply to "product withdrawal" expenses" arising out of: a. Any "product withdrawal" initiated due to: (1) The failure of "your products" to accomplish their intended purpose, including any breach of warranty of fitness, whether written or implied. This exclusion does not apply if such failure has caused or is reasonably expected to cause "bodily injury" or physical damage to tangible property. (2) Copyright, patent, trade secret or trademark infringements; (3) Transformation of a chemical nature, deterioration or decomposition of "your product", except if it is caused by: (a) An error in manufacturing, design, processing or transportation of "your product"; or (b) "Product tampering". (4) Expiration of the designated shelf life of "your product". b. A "product withdrawal", initiated because of a "defect" in "your product" known to exist by the Named Insured or the Named Insured's "executive officers", prior to the inception date of this Coverage Part or prior to the time "your product" leaves your control or possession. c. Recall of any specific products for which "bodily injury" or "property damage" is excluded under Coverage A - Bodily Injury And Property Damage Liability by endorsement. d. Recall of "your products" which have been banned from the market by an authorized government entity prior to the policy period. e. The defense of a claim or "suit" against you for "product withdrawal expenses". 3. For the purposes of the insurance afforded under COVERAGE F, the following is added to 2. Duties In The Event Of Occurrence, Offense, Claim Or Suit Condition under SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS: e. Duties In The Event Of A "Defect" Or A "Product Withdrawal" (1) You must see to it that we are notified as soon as practicable of any actual, suspected or threatened "defect" in "your products", or any governmental investigation, that may result in a "product withdrawal". To the extent possible, notice should include: CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 5 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) (a) How, when and where the "defect" was discovered; (b) The names and addresses of any injured persons and witnesses; and (c) The nature, location and circumstances of any injury or damage arising out of use or consumption of "your product". (2) If a "product withdrawal" is initiated, you must: (a) Immediately record the specifics of the "product withdrawal" and the date it was initiated; (b) Send us written notice of the "product withdrawal" as soon as practicable; and (c) Not release, consign, ship or distribute by any other method, any product, or like or similar products, with an actual, suspected or threatened defect. (3) You and any other involved insured must: (a) Immediately send us copies of pertinent correspondence received in connection with the "product withdrawal"; (b) Authorize us to obtain records and other information; and (c) Cooperate with us in our investigation of the "product withdrawal". 4. For the purposes of this Coverage F, the following definitions are added to the Definitions Section: a. "Defect" means a defect, deficiency or inadequacy that creates a dangerous condition. b. "Product tampering" is an act of intentional alteration of "your product" which may cause or has caused "bodily injury" or physical injury to tangible property. When "product tampering" is known, suspected or threatened, a "product withdrawal" will not be limited to those batches of "your product" which are known or suspected to have been tampered with. c. "Product withdrawal" means the recall or withdrawal of "your products", or products which contain "your products", from the market or from use, by any other person or organization, because of a known or suspected "defect" in "your product", or a known or suspected "product tampering", which has caused or is reasonably expected to cause "bodily injury" or physical injury to tangible property. d. "Product withdrawal expenses" means those reasonable and necessary extra expenses, listed below paid and directly related to a "product withdrawal": (1) Costs of notification; (2) Costs of stationery, envelopes, production of announcements and postage or facsimiles; (3) Costs of overtime paid to your regular non -salaried employees and costs incurred by your employees, including costs of transportation and accommodations; (4) Costs of computer time; (5) Costs of hiring independent contractors and other temporary employees; (6) Costs of transportation, shipping or packaging; CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 6 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) (7) Costs of warehouse or storage space; or (8) Costs of proper disposal of "your products", or products that contain "your products", that cannot be reused, not exceeding your purchase price or your cost to produce the products; but "product withdrawal expenses" does not include costs of the replacement, repair or redesign of "your product", or the costs of regaining your market share, goodwill, revenue or profit. e. "Seller" means a person or organization that manufactures, sells or distributes goods or products. "Seller" does not include a "contractor" as defined elsewhere in this endorsement. The insurance under COVERAGE F does not apply if a loss is paid under COVERAGE G. COVERAGE G. CONTRACTORS ERRORS AND OMISSIONS 1. Insuring Agreement If you are a "contractor", we will pay those sums that you become legally obligated to pay as damages because of "property damage" to "your product", "your work" or "impaired property", due to faulty workmanship, material or design, or products including consequential loss, to which this insurance applies. The damages must have resulted from your negligent act, error or omission while acting in your business capacity as a contractor or subcontractor or from a defect in material or a product sold or installed by you while acting in this capacity. The amount we will pay for damages is described in SECTION III LIMITS OF INSURANCE. We have no duty to investigate or defend claims or "suits" covered by this Contractors Errors or Omissions coverage. This coverage applies only if the "property damage" occurs in the "coverage territory" during the policy period. This coverage does not apply to additional insureds, if any. Supplementary Payments — Coverage A and B do not apply to Coverage G. Contractors Errors and Omissions. 2. Exclusions This insurance does not apply to: a. "Bodily injury" or "personal and advertising injury". b. Liability or penalties arising from a delay or failure to complete a contract or project, or to complete a contract or project on time. c. Liability because of an error or omission: (1) In the preparation of estimates or job costs; (2) Where cost estimates are exceeded; (3) In the preparation of estimates of profit or return on capital; (4) In advising or failure to advise on financing of the work or project; or (5) In advising or failing to advise on any legal work, title checks, form of insurance or suretyship. CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 7 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) d. Any liability which arises out of any actual or alleged infringement of copyright or trademark or trade dress or patent, unfair competition or piracy, or theft or wrongful taking of concepts or intellectual property. e. Any liability for damages: (1) From the intentional dishonest, fraudulent, malicious or criminal acts of the Named Insured, or by any partner, member of a limited liability company, or executive officer, or at the direction of any of them; or (2) Which is in fact expected or intended by the insured, even if the injury or damage is of a different degree or type than actually expected or intended. f. Any liability arising out of manufacturer's warranties or guarantees whether express or implied. g. Any liability arising from "property damage" to property owned by, rented or leased to the insured. h. Any liability incurred or "property damage" which occurs, in whole or in part, before you have completed "your work." "Your work" will be deemed completed at the earliest of the following times: (1) When all of the work called for in your contract or work order has been completed; (2) When all the work to be done at the job site has been completed if your contract calls for work at more than one job site; or (3) When that part of the work done at a job site has been put to its intended use by any person or organization other than another contractor or subcontractor working on the same project. Work that may need service or maintenance, correction, repair or replacement, but which is otherwise complete, will be treated as complete. Any liability arising from "property damage" to products that are still in your physical possession. Any liability arising out of the rendering of or failure to render any professional services by you or on your behalf, but only with respect to either or both of the following operations: (1) Providing engineering, architectural or surveying services to others; and (2) Providing or hiring independent professionals to provide engineering, architectural or surveying services in connection with construction work you perform. Professional services include the preparing, approving or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders, or drawings and specifications. Professional services also include supervisory or inspection activities performed as part of any related architectural or engineering activities. But, professional services do not include services within construction means, methods, techniques, sequences and procedures employed by you in connection with construction work you perform. k. Your loss of profit or expected profit and any liability arising therefrom. I. "Property damage" to property other than "your product," "your work" or "impaired property." m. Any liability arising from claims or "suits" where the right of action against the insured has been relinquished or waived. CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 8 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) n. Any liability for "property damage" to "your work" if the damaged work or the work out of which the damage arises was performed on your behalf by a subcontractor. o. Any liability arising from the substitution of a material or product for one specified on blueprints, work orders, contracts or engineering specifications unless there has been written authorization, or unless the blueprints, work orders, contracts or engineering specifications were written by you, and you have authorized the changes. p. Liability of others assumed by the insured under any contract or agreement, whether oral or in writing. This exclusion does not apply to liability for damages that the insured would have in the absence of the contract or agreement. 3. For the purposes of Coverage G, the following definition is added to the Definitions section: a. "Contractor" means a person or organization engaged in activities of building, clearing, filing, excavating or improvement in the size, use or appearance of any structure or land. "Contractor" does not include a "seller" as defined elsewhere in this endorsement. 4. Deductible We will not pay for loss in any one "occurrence" until the amount of loss exceeds $250. The limits of insurance will not be reduced by the application of the deductible amount. We may pay any part or all of the deductible amount to effect settlement of any claim or "suit", and upon notification of the action taken, you shall promptly reimburse us for such part of the deductible amount as has been paid by us. 5. Cost Factor In the event of a covered loss, you shall, if requested by us, replace the damaged property or furnish the labor and materials necessary for repairs thereto at your actual cost, excluding profit or overhead charges. The insurance under COVERAGE G does not apply if a loss is paid under COVERAGE F. EXPANDED COVERAGE FOR TENANT'S PROPERTY AND PREMISES RENTED TO YOU The first paragraph after subparagraph (6) in Exclusion j., Damage to Property is amended to read as follows: Paragraphs (1), (3) and (4) of this exclusion do not apply to "property damage" (other than damage by fire) to premises, including the contents of such premises, rented to you. A separate limit of insurance applies to Damage To Premises Rented To You as described in Section III — Limits Of Insurance. SECTION I - COVERAGES, SUPPLEMENTARY PAYMENTS — COVERAGE A and B is amended as follows: All references to SUPPLEMENTARY PAYMENTS — COVERAGES A and B are amended to SUPPLEMENTARY PAYMENTS — COVERAGES A, B, D, E, and G. 1. Cost of Bail Bonds Paragraph 1.b. is replaced with the following: b. Up to $2,500 for cost of bail bonds required because of accidents or traffic law violations arising out of the use of any vehicle to which the Bodily Injury Liability Coverage applies. We do not have to furnish these bonds. CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 9 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) 2. Loss of Earnings Paragraph 1.d. is replaced with the following: d. All reasonable expenses incurred by the insured at our request to assist us in the investigation or defense of the claim or "suit", including actual loss of earnings up to $500 a day because of time off from work. SECTION II — WHO IS AN INSURED is amended as follows: 1. Incidental Malpractice Paragraph 2.a.(1)(d) is replaced with the following: (d) Arising out of his or her providing or failing to provide professional health care services. However, this exclusion does not apply to a nurse, emergency medical technician or paramedic employed by you to provide medical services, unless: (i) You are engaged in the occupation or business of providing or offering medical, surgical, dental, x-ray or nursing services, treatment, advice or instruction; or (ii) The "employee" has another insurance that would also cover claims arising under this provision, whether the other insurance is primary, excess, contingent or on any other basis. 2. Broadened Who Is An Insured The following are added to Paragraph 2.: Subsidiaries e. Your subsidiaries if: (1) They are legally incorporated entities; and (2) You own more than 50% of the voting stock in such subsidiaries as of the effective date of this policy. If such subsidiaries are not shown in the Declarations, you must report them to us within 180 days of the inception of your original policy. Additional Insureds f. Any person or organization described in paragraphs g. through k. below whom you are required to add as an additional insured on this policy under a written contract or agreement in effect during the term of this policy, provided the written contract or agreement was executed prior to the "bodily injury", "property damage" or "personal and advertising injury" for which the additional insured seeks coverage. However, the insurance afforded to such additional insured(s): (1) Only applies to the extent permitted by law; (2) Will not be broader than that which you are required by the contract or agreement to provide for such additional insured; (3) Will not be broader than that which is afforded to you under this policy; (4) Is subject to the conditions described in paragraphs g. through k. below; and CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 10 of 16 Copyright 2013 FCCI Insurance Group g. COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) (5) Nothing herein shall extend the term of this policy. Owner, Lessor or Manager of Premises If the additional insured is an owner, lessor or manager of premises, such person or organization shall be covered only with respect to liability arising out of the ownership, maintenance or use of that part of any premises leased to you and subject to the following additional exclusions: (1) Any "occurrence" that takes place after you cease to occupy those premises; or (2) Structural alterations, new construction or demolition operations performed by or on behalf of such person or organization. h. State or Governmental Agency or Subdivision or Political Subdivision — Permits or Authorizations If the additional insured is the state or any political subdivision, the state or political subdivision shall be covered only with respect to operations performed by you or on your behalf for which the state or political subdivision has issued a permit or authorization. This insurance does not apply to: (1) "Bodily injury", "property damage", or "personal and advertising injury" arising out of operations performed for the federal government, state or municipality; or (2) "Bodily injury" or "property damage" included within the "products -completed operations hazard". i. Lessor of Leased Equipment j• If the additional insured is a lessor of leased equipment, such lessor shall be covered only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" caused, in whole or in part, by your maintenance, operation or use of equipment leased to you by such person(s) or organization(s). With respect to the insurance afforded to these additional insureds, this insurance does not apply to any "occurrence" which takes place after the equipment lease expires. Mortgagee, Assignee, or Receiver If the additional Insured is a mortgagee, assignee, or receiver of premises, such mortgagee, assignee or receiver of premises is an additional insured only with respect to their liability as mortgagee, assignee, or receiver and arising out of the ownership, maintenance, or use of the premises by you. This insurance does not apply to structural alterations, new construction and demolition operations performed by or for that person or organization. k. Vendor If the additional insured is a vendor, such vendor is an additional insured only with respect to "bodily injury" or "property damage" caused by "your products" which are distributed or sold in the regular course of the vendor's business, subject to the following additional exclusions: (1) The insurance afforded to the vendor does not apply to: (a) "Bodily injury" or "property damage" for which the vendor is obligated to pay damages by reason of the assumption of liability in a contract or agreement. This exclusion does not apply to liability for damages that the vendor would have in absence of the contract or agreement. (b) Any express warranty unauthorized by you; CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 11 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) (c) Any physical or chemical change in "your product" made intentionally by the vendor; (d) Repackaging, unless unpacked solely for the purpose of inspection, demonstration, testing, or the substitution of parts under instructions from the manufacturer, and then repackaged in the original container; (e) Any failure to make such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products; (f) Demonstration, installation, servicing or repair operations, except such operations performed at the vendor's premises in connection with the sale of the product; (g) Products which, after distribution or sale by you, have been labeled or relabeled or used as a container, part or ingredient of any other thing or substance by or for the vendor; or (h) "Bodily injury" or "property damage" arising out of the sole negligence of the vendor for its own acts or omissions or those of its own acts or omissions or those of its employees or anyone else acting on its behalf. However, this exclusion does not apply to: i. The exceptions contained in Subparagraphs d. or f.; or ii. Such inspections, adjustments, tests or servicing as the vendor has agreed to make or normally undertakes to make in the usual course of business, in connection with the distribution or sale of the products. (2) This insurance does not apply to any insured person or organization, from whom you have acquired such products, or any ingredient, part or container, entering into, accompanying or containing such products. 3. Newly Formed or Acquired Organizations Paragraph 3. is amended as follows: a. Coverage under this provision is afforded until the end of the policy period. d. Coverage A does not apply to product recall expense arising out of any withdrawal or recall that occurred before you acquired or formed the organization. SECTION III — LIMITS OF INSURANCE is amended as follows: 1. Paragraph 2. is replaced with the following: 2. The General Aggregate Limit is the most we will pay for the sum of: a. Medical expenses under Coverage C; b. Damages under Coverage A, except damages because of "bodily injury" or "property damage" included in the "products -completed operations hazard"; c. Damages under Coverage B; d. Voluntary "property damage" payments under Coverage D; and e. Care, Custody or Control damages under Coverage E. CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 12 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) 2. Paragraph 5. is replaced with the following: 5. Subject to Paragraph 2. or 3. above, whichever applies, the Each Occurrence Limit is the most we will pay for the sum of: a. Damages under Coverage A; b. Medical expenses under Coverage C; c. Voluntary "property damage" payments under Coverage D; d. Care, Custody or Control damages under Coverage E; e. Limited Product Withdrawal Expense under Coverage F; and f. Contractors Errors and Omissions under Coverage G. because of all "bodily injury" and "property damage" arising out of any one "occurrence". 3. Paragraph 6. is replaced with the following: 6. Subject to Paragraph 5. above the Damage To Premises Rented To You Limit is the most we will pay under Coverage A for damages because of "property damage" to any one premises, while rented to you, or in the case of damage by fire or explosion, while rented to you or temporarily occupied by you with permission of the owner. The Damage to Premises Rented to You Limit is the higher of the Each Occurrence Limit shown in the Declarations or the amount shown in the Declarations as Damage To Premises Rented To You Limit. 4. Paragraph 7. is replaced with the following: 7. Subject to Paragraph 5. above, the higher of $10,000 or the Medical Expense Limit shown in the Declarations is the most we will pay under Coverage C for all medical expenses because of "bodily injury" sustained by any one person. 5. Paragraph 8. is added as follows: 8. Subject to Paragraph 5. above, the most we will pay under Coverage D. Voluntary Property Damage for loss arising out of any one "occurrence" is $1,500. The most we will pay in any one -policy period, regardless of the number of claims made or suits brought, is $3,000. 6. Paragraph 9. is added as follows: 9. Subject to Paragraph 5. above, the most we will pay under Coverage E. Care, Custody or Control for "property damage" arising out of any one "occurrence" is $1,000. The most we will pay in any one -policy period, regardless of the number of claims made or suits brought, is $5,000. 7. Paragraph 10. is added as follows: 10. Subject to Paragraph 5. above, the most we will pay under Coverage F. Limited Product Withdrawal Expense for "product withdrawal expenses" in any one -policy period, regardless of the number of insureds, "product withdrawals" initiated or number of "your products" withdrawn is $10,000. CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 13 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) 8. Paragraph 11. is added as follows: 11. Subject to Paragraph 5. above, the most we will pay under Coverage G. Contractors Errors and Omissions for damage in any one -policy period, regardless of the number of insureds, claims or "suits" brought, or persons or organizations making claim or bringing "suits" is $10,000. For errors in contract or job specifications or in recommendations of products or materials to be used, this policy will not pay for additional costs of products and materials to be used that would not have been incurred had the correct recommendations or specifications been made. 9. Paragraph 12. is added as follows: 12. The General Aggregate Limit applies separately to: a. Each of your projects away from premises owned by or rented to you; or b. Each "location" owned by or rented to you. "Location" as used in this paragraph means premises involving the same or connecting lots, or premises whose connection is interrupted only by a street, roadway, waterway or right-of-way of a railroad. 10. Paragraph 13. is added as follows: 13. With respect to the insurance afforded to any additional insured provided coverage under this endorsement: If coverage provided to the additional insured is required by a contract or agreement, the most we will pay on behalf of the additional insured is the amount of insurance: a. Required by the contract or agreement; or b. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. SECTION IV — COMMERCIAL GENERAL LIABILITY CONDITIONS is amended as follows: 1. Subparagraph 2.a. of Duties In The Event Of Occurrence, Offense, Claim, or Suit is replaced with the following: a. You must see to it that we are notified as soon as practicable of an "occurrence" or an offense which may result in a claim. This requirement applies only when the "occurrence" or offense is known to the following: (1) An individual who is the sole owner; (2) A partner, if you are a partnership or joint venture; (3) An "executive officer" or insurance manager, if you are a corporation; (4) A manager, if you are a limited liability company; CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 14 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) (5) A person or organization having proper temporary custody of your property if you die; (6) The legal representative of you if you die; or (7) A person (other than an "employee") or an organization while acting as your real estate manager. To the extent possible, notice should include: (1) How, when and where the "occurrence" or offense took place; (2) The names and addresses of any injured persons and witnesses; and (3) The nature and location of any injury or damage arising out of the `occurrence" or offense. 2. The following is added to Subparagraph 2.b. of Duties In The Event Of Occurrence, Offense, Claim, or Suit: The requirement in 2.b.applies only when the `occurrence" or offense is known to the following: (1) An individual who is the sole owner; (2) A partner or insurance manager, if you are a partnership or joint venture; (3) An "executive officer" or insurance manager, if you are a corporation; (4) A manager or insurance manager, if you are a limited liability company; (5) Your officials, trustees, board members or insurance manager, if you are a not-for-profit organization; (6) A person or organization having proper temporary custody of your property if you die; (7) The legal representative of you if you die; or (8) A person (other than an "employee") or an organization while acting as your real estate manager. 3. The following is added to paragraph 2. of Duties in the Event of Occurrence, Offense, Claim or Suit: e. If you report an "occurrence" to your workers compensation carrier that develops into a liability claim for which coverage is provided by the Coverage Form, failure to report such an `occurrence" to us at the time of the "occurrence" shall not be deemed a violation of paragraphs a., b., and c. above. However, you shall give written notice of this "occurrence" to us as soon as you become aware that this "occurrence" may be a liability claim rather than a workers compensation claim. 4. Paragraph 6. is replaced with the following: 6. Representations By accepting this policy, you agree: a. The statements in the Declarations are accurate and complete; b. Those statements are based upon representations you made to us; and c. We have issued this policy in reliance upon your representations. CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 15 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 088 (10 13) Any error or omission in the description of, or failure to completely describe or disclose any premises, operations or products intended to be covered by the Coverage Form will not invalidate or affect coverage for those premises, operations or products, provided such error or omission or failure to completely describe or disclose premises, operations or products was not intentional. You must report such error or omission to us as soon as practicable after its discovery. However, this provision does not affect our right to collect additional premium charges or exercise our right of cancellation or nonrenewal. 5. The following is added to paragraph 8. Transfer Of Rights Of Recovery Against Others To Us: However, we waive any right of recovery we may have because of payments we make for injury or damage arising out of your ongoing operations or "your work" included in the "products -completed operations hazard" under the following conditions: a) Only when you have agreed in writing to waive such rights of recovery in a contract or agreement; b) Only as to the person/entity as to whom you are required by the contract to waive rights of recovery; and c) Only if the contract or agreement is in effect during the term of this policy, and was executed by you prior to the loss. 6. Paragraph 10. is added as follows: 10. Liberalization If we revise this Coverage Form to provide more coverage without additional premium charge, your policy will automatically provide the additional coverage as of the day the revision is effective in the applicable state(s). CGL 088 (10 13) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 16 of 16 Copyright 2013 FCCI Insurance Group COMMERCIAL GENERAL LIABILITY CGL 084 (10 13) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - AUTOMATIC STATUS WHEN REQUIRED IN CONSTRUCTION AGREEMENT WITH YOU - ONGOING OPERATIONS AND PRODUCTS -COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE FORM SCHEDULE (OPTIONAL) Name of Additional Insured Persons or Organizations (As required by written contract or agreement per Paragraph A. below.) Locations of Covered Operations (As per the written contract or agreement, provided the location is within the "coverage territory") (Information required to complete this Schedule, if not shown above, will be shown in the Declarations.) A. Section II — Who Is An Insured is amended to include as an additional insured: 1. Any person or organization for whom you are performing operations when you and such person or organization have agreed in writing in a contract or agreement in effect during the term of this policy that such person or organization be added as an additional insured on your policy; and 2. Any other person or organization you are required to add as an additional insured under the contract or agreement described in Paragraph 1. above; and 3. The particular person or organization, if any, scheduled above. Such person(s) or organization(s) is an additional insured only with respect to liability for "bodily injury", "property damage" or "personal and advertising injury" occurring after the execution of the contract or agreement described in Paragraph 1. above and caused, in whole or in part, by: 1. Your acts or omissions; or 2. The acts or omissions of those acting on your behalf in the performance of your ongoing operations for the additional insured; or 3. Your work" performed for the additional insured and included in the "products -completed operations hazard" if such coverage is specifically required in the written contract or agreement. CGL 084 (10 13) Includes copyrighted material of the Insurance Services Offices, Inc. with its permission. Page 1 of 3 Copyright 2013 FCCI Insurance Group. COMMERCIAL GENERAL LIABILITY CGL 084 (10 13) However, the insurance afforded to such additional insured(s) described above: 1. Only applies to the extent permitted by law; 2. Will not be broader than that which you are required by the contract or agreement to provide for such additional insured; 3. Will not be broader than that which is afforded to you under this policy; and 4. Nothing herein shall extend the term of this policy. B. The insurance provided to the additional insured does not apply to "bodily injury", "property damage" or "personal and advertising injury" arising out of the rendering of, or the failure to render, any professional architectural, engineering or surveying services, including: 1. The preparing, approving, or failing to prepare or approve, maps, shop drawings, opinions, reports, surveys, field orders, change orders or drawings and specifications; or 2. Supervisory, inspection, architectural or engineering activities. C. This insurance is excess over any other valid and collectible insurance available to the additional insured whether on a primary, excess, contingent or any other basis; unless the written contract or agreement requires that this insurance be primary and non-contributory, in which case this insurance will be primary and non-contributory relative to insurance on which the additional insured is a Named Insured. D. With respect to the insurance afforded to these additional insureds, the following is added to Section III — Limits of Insurance: The most we will pay on behalf of the additional insured is the amount of insurance: 1. Required by the contract or agreement described in Paragraph A.1.; or 2. Available under the applicable Limits of Insurance shown in the Declarations; whichever is less. This endorsement shall not increase the applicable Limits of Insurance shown in the Declarations. E. Section IV — Commercial General Liability Conditions is amended as follows: The Duties In The Event of Occurrence, Offense, Claim or Suit condition is amended to add the following additional conditions applicable to the additional insured: An additional insured under this endorsement must as soon as practicable: 1. Give us written notice of an "occurrence" or an offense which may result in a claim or "suit" under this insurance, and of any claim or "suit" that does result; 2. Send us copies of all legal papers received in connection with the claim or "suit", cooperate with us in the investigation or settlement of the claim or defense against the "suit", and otherwise comply with all policy conditions; and 3. Tender the defense and indemnity of any claim or "suit" to any provider of other insurance which would cover the additional insured for a loss we cover under this endorsement and agree to make available all such other insurance. However, this condition does not affect Paragraph C. above. CGL 084 (10 13) Includes copyrighted material of the Insurance Services Offices, Inc. with its permission. Page 2 of 3 Copyright 2013 FCCI Insurance Group. COMMERCIAL GENERAL LIABILITY CGL 084 (10 13) We have no duty to defend or indemnify an additional insured under this endorsement until we receive from the additional insured written notice of a claim or "suit". F. This endorsement does not apply to any additional insured or project that is specifically identified in any other additional insured endorsement attached to the Commercial General Liability Coverage Form. CGL 084 (10 13) Includes copyrighted material of the Insurance Services Offices, Inc. with its permission. Page 3 of 3 Copyright 2013 FCCI Insurance Group. POLICY NUMBER: CA100007275-01 COMMERCIAL AUTOMOBILE CAU 042 (01 15) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED DESIGNATED PERSON OR ORGANIZATION PRIMARY/NON-CONTRIBUTORY COVERAGE This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM This endorsement is subject to the terms, conditions, exclusions and any other provisions of the BUSINESS AUTO COVERAGE FORM or any endorsement attached thereto unless changes or additions are indicated below. For the purpose of this endorsement, Section II. A. 1. Who Is An Insured is amended by adding the following: 1. Any person or organization designated in the schedule below is an "insured" for Liability Coverage but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured Provision contained in Section II of the Coverage Form. 2. This insurance is primary and non-contributory to other coverages of the person or organization shown in the Schedule when so required in a written contract or agreement that is executed prior to the loss for which coverage is sought. SCHEDULE Name of Person or Organization: Any person or organization who is required under a written contract or agreement between you and that person or organization, that is signed and executed by you before the ?bodily injury? or ?property damage? occurs and that is in effect during the policy period. CAU042 (01 15) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Copyright 2013 FOCI Insurance Group. Ins,'gd Copy Page 1 of 1 AUTO FIRST CHOICE COVERAGE ENDORSEMENT TABLE OF CONTENTS DESCRIPTION PAGE Airbag Coverage 3 Auto Loan/Lease Gap Coverage 3 Broad Form Insured 1 Concealment, Misrepresentation or Fraud 4 Deductible 3 Duties in the Event of Accident, Claim, Suit or Loss. 4 Fellow Employee 2 Fire Department Service Charge 2 Other Insurance for Hired Auto Physical Damage Coverage 4 Loss of Earnings 2 Loss of Use Expenses 2 Supplementary Payments .2 Transfer of Rights of Recovery against Others to Us 4 Transportation Expenses 2 Insured Copy THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. AUTO FIRST CHOICE COVERAGE ENDORSEMENT This endorsement modifies insurance provided under the following. BUSINESS AUTO COVERAGE FORM NOTE: The following are additions, replacements and amendments to the Business Auto Coverage Form, and will apply unless excluded by separate endorsement(s) to the Business Auto Coverage Form. With respect to coverages provided by this endorsement, the provisions of the Business Auto Coverage Form apply unless modified by this endorsement. The Business Auto Coverage Form is amended as follows: SECTION II -- COVERED AUTOS LIABILITY COVERAGE is amended as follows: A. Paragraph 1. Who Is An Insured in section A. Coverage is amended by the addition of the following: d. Any legally incorporated subsidiary of yours in which you own more than 50% of the voting stock on the effective date of this coverage form. However, "insured" does not include any subsidiary that is an "insured" under any other liability policy or would be an "insured" under such a policy but for its termination or the exhaustion of its limits of insurance. In order for such subsidiaries to be considered insured under this policy, you must notify us of such subsidiaries within 60 days of policy effective date. e. Any organization you newly acquire or form during the policy period, other than a partnership or joint venture, and over which you maintain sole ownership or a majority interest. However, coverage under this provision: (1) Does not apply if the organization you acquire or form is an ''insured" under another liability policy or would be an "insured" under such a policy but for its termination or the exhaustion of its limits of insurance; (2) Does not apply to "bodily injury" or "property damage" that occurred before you acquired or formed the organization; and (3) Is afforded only for the first 90 days after you acquire or form the organization or until the end of the policy period, whichever comes first. f. Any person or organization who is required under a written contract or agreement between you and that person or organization, that is signed and executed by you before the "bodily injury" or "property damage" occurs and that is in effect during the policy period, to be named as an additional insured is an "insured" for Liability Coverage, but only for damages to which this insurance applies and only to the extent that person or organization qualifies as an -insured" under the Who Is An Insured provision contained in Section Il. 9. Any "employee" of yours using: (1) a covered "auto" you do not own, hire or borrow, or a covered "auto" not owned by an "employee" or a member of his or her household, while performing duties related to the conduct of your business or your personal affairs; or (2) an "auto" hired or rented under a contract or agreement in that "employee's" name, with your permission, while performing duties related to the conduct of your business. However, your "employee" does not qualify as an insured under this paragraph (2) while using a covered "auto" rented from you or from any member of the 'employee's" household h. Your members, if you are a limited liability company, while using a covered "auto" you do not own, hire or borrow, while performing duties related to the conduct of your business or your personal affairs. B. Paragraphs (2) and (4) under section 2. Coverage Extensions, a. Supplementary Payments are deleted and replaced by the following: CAU 058 (01 15) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 1 of 4 Copyright 2015 FOCI Insurance Group. Insured Copy COMMERCIAL AUTO CAU 058 01 15) (2) Up to $3,000 for cost of bail bonds (including bonds for related traffic violations) required because of an "accident" we cover. We do not have to furnish these bonds. (4) All reasonable expenses incurred by the "insured" solely at our request, including actual loss of earnings up to $500 a day because of time off from work. C. Paragraph 5. under section B. Exclusions is deleted and replaced by the following: 5. Fellow Employee "Bodily injury" to: a. Any fellow "employee" of the `insured" arising out of and in the course of a fellow 'employee's" employment or while performing duties related to the conduct of your business. However, this exclusion does not apply to your 'employees" that are officers or managers if the "bodily injury" results from the use of a covered "auto" you own, hire or borrow. Coverage is excess over any other collectible insurance; or b. The spouse, child, parent, brother or sister of that fellow "employee" as a consequence of Paragraph a. above. SECTION III — PHYSICAL DAMAGE COVERAGE is amended as follows: A. Paragraph 4. Coverage Extensions under section A. Coverage is deleted and replaced by the following: 4. Coverage Extensions a. Transportation Expenses We will pay up to $75 per day to a total maximum of $2,000 for temporary transportation expense incurred by you due to covered loss to any covered auto. We will pay only for those covered "autos" for which you carry either Comprehensive or Specified Causes Of Loss Coverage. We will pay for temporary transportation expenses incurred during the period beginning 24 hours after a loss and ending, regardless of the policy's expiration, when the covered "auto" is returned to use or we pay for its "loss". b. Loss of Use Expenses For Hired Auto Physical Damage, we will pay expenses for which an "insured" becomes legally responsible to pay for loss of use of a vehicle rented or hired without a driver under a written rental contract or agreement. We will pay for loss of use expenses if caused by: (1) Other than collision only if the Declarations indicate that Comprehensive Coverage is provided for hired "autos"; (2) Specified Causes of Loss only if the Declarations indicate that Specified Causes of Loss Coverage is provided for hired "autos"; or (3) Collision only if the Declarations indicate that Collision Coverage is provided for hired "autos" However, the most we will pay for any expenses for loss of use to any one vehicle is $75 per day, to a total maximum of $2,000. B. The following is added to paragraph 4. Coverage Extensions under section A. Coverage: c. Fire Department Service Charge When a fire department is called to save or protect a covered "auto", its equipment, its contents, or occupants from a covered cause of loss, we will pay up to $1,000 for your liability for fire department service charges assumed by contractor or agreement prior to loss. No deductible applies to this additional coverage. d. Auto Loan/Lease Gap Coverage The following provisions apply: (1) If a long term leased "auto", under an original lease agreement, is a covered "auto" under this coverage form and the lessor of the covered "auto" is named as an additional insured under this policy, in the event of a total loss to the leased covered 'auto", we will pay any unpaid amount due on the lease, less the amount paid under the Physical Damage Coverage Section of the policy; and less any: (a) Overdue lease or loan payments including penalties, interest. or other charges resulting from CAU 058 (01 15) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 2 of 4 Copyright 2015 FCCI Insurance Group. Insured Copy COMMERCIAL AUTO CAU 058 (01 15) overdue payments at the time of the "loss"; (b) Financial penalties imposed under a lease for excessive use, abnormal wear and tear or high mileage; (c) Security deposits not refunded by the lessor; (d) Costs for extended warranties, Credit Life Insurance, Health Accident or Disability Insurance purchased with the loan or lease; and (e) Carry-over balances from previous loans or leases. (2) If an owned "auto" is a covered "auto" under this coverage form and the loss payee of the covered "auto" is named a loss payee under this policy, in the event of a total loss to the covered "auto", we will pay any unpaid amount due on the loan, less the amount paid under the Physical Damage Coverage Section of the policy; and less any; (a) Overdue loan payments at the time of the "loss"; (b) Costs for extended warranties, Credit Life Insurance, Health Accident or Disability Insurance purchased with the loan; and (c) Carry-over balances from previous loans. C. Paragraph 3. under section B. Exclusions is deleted and replaced by the following: 3. We will not pay for "loss" due and confirmed to: a. Wear and tear, freezing, mechanical or electrical breakdown b. Blowouts, punctures or other road damage to tires This exclusion does not apply to such "loss" resulting from the total theft of a covered "auto". However, this exclusion does not include the discharge of an airbag in a covered "auto" you own that inflates due to a cause other than a cause of "loss" set forth in Paragraphs A.1.b and A.1.c.but only: a. If that "auto" is a covered "auto" for Comprehensive Coverage under this policy; b. The airbags are not covered under any warranty; and c. The airbags were not intentionally inflated We will pay up to a maximum of $1,000 for any one "loss". D. Section D. Deductible is deleted and replaced by the following: D. Deductible For each covered "auto", our obligation to pay for, repair, return or replace damaged or stolen property will be reduced by the applicable deductible shown in the Declarations subject to the following: Any Comprehensive Coverage deductible shown in the Declarations does not apply to: (1) "Loss" caused by fire or lightning; and (2) "Loss" arising out of theft of your vehicle if your vehicle is equipped with an active GPS tracking system. (3) Glass damage to the side or rear windows if the glass is repaired rather than replaced. However, no deductible shall apply to damage to the windshield of any covered "auto" or to safety glass.. SECTION IV — BUSINESS AUTO CONDITIONS is amended as follows: A. The following is added to paragraph a. under section A. Loss Conditions, 2. Duties in the Event of Accident, Claim, Suit or Loss: This duty applies when the "accident", claim, "suit" or "loss" is first known to: (a) You, if you are an individual; (b) A partner, if you are a partnership; (c) An executive officer or insurance manager, if you are a corporation; or CAU 058 (01 15) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 3 of 4 Copyright 2015 FCCI Insurance Group. Insured Copy COMMERCIAL AUTO CAU 058 (01 15) (d) A member or manager, if you are a limited liability company. B. Condition 5. Transfer of Rights of Recovery against Others to Us under section A. Loss Conditions is deleted and replaced by the following: 5. Transfer of Rights of Recovery against Others to Us If a person or organization to or for whom we make payment under this coverage form has rights to recover damages from another, those rights are transferred to us. That person or organization must do everything necessary to secure our rights and must do nothing after "accident" or "loss" to impair them. However, if the insured has waived rights to recover through a written contract, or if your work was commenced under a letter of intent or work order, subject to a subsequent reduction in writing of such a waiver with customers whose customary contracts require a waiver, we waive any right of recovery we may have under this coverage form. C. The following is added to Condition 2. Concealment, Misrepresentation or Fraud under section B. General Conditions: However, if you unintentionally fail to disclose any hazards at the inception of your policy, we will not deny coverage under this coverage form because of such failure. This provision does not affect our right to collect additional premium or exercise our right of cancellation or non -renewal. D. Paragraph b. of Condition 5. Other Insurance under section B. General Conditions is deleted and replaced by the following: b. For Hired Auto Physical Damage Coverage, the following are deemed to be covered "autos" you own; (1) Any covered "auto" you lease, hire, rent or borrow; and (2) Any covered "auto" hired or rented by your "employee" under a contract in that individual "employee's" name, with your permission, while performing duties related to the conduct of your business. However, any "auto" that is leased, hired, rented or borrowed with a driver is not a covered "auto", nor is any "auto" you hire from any of your "employees", partners (if you are a partnership), members (if you are a limited liability company), or members of their households. CAU 058 (01 15) Includes copyrighted material of the Insurance Services Office, Inc., with its permission. Page 4 of 4 Copyright 2015 FCCI Insurance Group. Ensured Capy TexasMutuar" WORKERS' COMPENSATION INSURANCE WORKERS' COMPENSATION AND EMPLOYERS LIABILITY POLICY WC420304B Insured Copy TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the Schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. ( ) Specific Waiver Name of person or organization ( X ) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. Operations: ALL TEXAS OPERATIONS 3. Premium The premium charge for this endorsement shall be 2.00 percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. Advance Premium: INCLUDED, SEE INFORMATION PAGE. This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different date is indicated below. (The following "attaching clause" need be completed only when this endorsement is issued subsequent to preparation of the policy.) This endorsement. effective on 05117/2017 at 12:01 a.m. standard time, forms a part of: Policy No. 0001306815 of Texas Mutual Insurance Company effective on 05/17/2017 issued to: JE CONSTRUCTION SERVICES LLC NCCI Carrier Code: 29939 PC Box 12058, Austin, TX 78711-2058 1 of 1 (800) 859-5995 I Fax (800) 359-0650 I texasmutual.com 4/Le. Authorized Representative 05ftt12417 WC 42 03 04 B INTERLINE IL 014 (04 04) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. COVERAGE CHANGES POLICY NUMBER GL 0018400 2 POLICY CHANGES EFFECTIVE 11/02/2016 COMPANY FCCI INSURANCE COMPANY NAMED INSURED J E Construction Services LLC 11309 Leopard St Ste E Corpus Christi, TX 78410-2635 AUTHORIZED REPRESENTATIVE 07062-001 K&S Insurance Agency PO Box 277 COVERAGE PARTS AFFECTED This endorsement modifies insurance provided under the following: GENERAL LIABILITY CHANGES PREMIUM: $0 This endorsement modifies insurance provided under the following: Blanket 3rd Party Notice of Cancellation IL 011 (07/09) If we cancel this policy for any statutorily permitted reason other than nonpayment of premium we will mail notice of cancellation to any person or organization to whom you have agreed in a written contract that notice of cancellation of this policy will be given, but only if: 1. You send us a written request to provide such notice, including the name and address of such person or organization, after the first Named Insured shown in the Declarations receives notice from us of the cancellation of this policy; and 2. We receive such written request at least 45 days before the effective date of cancellation. We will mail such notice at least 30 days before the effective date of the cancellation. All other terms and conditions remain unchanged. Authorized Representative Signature IL 014 (04 04) Contains copyrighted material of Insurance Services Page 1 of 1 Office, Inc., with its permission. IL 060 (07 13) THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET NOTIFICATION TO OTHERS OF CANCELLATION This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM BUSINESS AUTO PHYSICAL DAMAGE COVERAGE FORM BUSINESSOWNERS COVERAGE FORM COMMERCIAL CRIME COVERAGE FORM COMMERCIAL GENERAL LIABILITY COVERAGE PART COMMERCIAL INLAND MARINE COVERAGE PART COMMERCIAL LIABILITY UMBRELLA COVERAGE FORM COMMERCIAL OUTPUT POLICY COMMERCIAL PROPERTY COVERAGE PART FARM COVERAGE PART FARM UMBRELLA COVERAGE FORM GARAGE COVERAGE FORM LIQUOR LIABILITY COVERAGE PART PRODUCT WITHDRAWAL COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART If we cancel this policy for any statutorily permitted reason other than nonpayment of premium we will mail notice of cancellation to any person or organization to whom you have agreed in a written contract that notice of cancellation of this policy will be given, but only if: 1. You send us a written request to provide such notice, including the name and address of such person or organization, after the first Named Insured shown in the Declarations receives notice from us of the cancellation of this policy; and, 2. We receive such written request at least 45 days before the effective date of cancellation. We will mail such notice at least 30 days before the effective date of the cancellation. Irrespective of any of the provisions above, nothing herein is intended to vest any right in the person or organization to be given notice, and said person or organization shall have no rights under this policy if he/it does not receive notice per this endorsement. IL 060 (07 13) Copyright 2013 FCCI Insurance Group. Insured Copy Page 1 of 1 TexasMutuar" WORKERS' COMPENSATION INSURANCE WORKERS' COMPENSATION AND EMPLOYERS LIABILITY POLICY TEXAS NOTICE OF MATERIAL CHANGE ENDORSEMENT WC 42 06 01 Insured Copy This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. In the event of cancellation or other material change of the policy, we will mail advance notice to the person or organization named in the Schedule. The number of days advance notice is shown in the Schedule. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule.. Schedule 1 Number of days advance notice: 30 2. Notice will be mailed to: PER LIST ON FILE This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different date is indicated below. (The following "attaching clause" need be completed only when this endorsement is issued subsequent to preparation of the policy.) This endorsement. effective on 05117/2017 at 12:01 a.m. standard time, forms a part of: Policy No. 0001306815 of Texas Mutual Insurance Company effective on 05/17/2017 issued to: JE CONSTRUCTION SERVICES LLC NCCI Carrier Code: 29939 PC Box 12058, Austin, TX 78711-2058 1 of 1 (800) 859-5995 I Fax (800) 359-0650 I texasmutual.com 4/Le. Authorized Representative 05ftt12417 WC 42 06 01 00 61 16 PAYMENT BOND BOND NO. 1001087220 Contractor as Principal Name: JE Construction Services Mailing address (principal place of business): 11309 Leopard St., Unit E Corpus Christi, TX 78410 Owner Name: City of Corpus Christi, Texas Mailing address (principal place of business): Engineering Services 1201 Leopard Street Corpus Christi, Texas 78469 Contract Project name and number: E16271 Ralston Avenue Improvements — Staples to Alameda Award Date of the Contract: August 8, 2017 Contract Price: $1,453,476.33 Bond Date of Bond: August 14, 2017 (Date of Bond cannot be earlier than Award Date of Contract) Surety Name: U.S. Specialty Insurance Company Mailing address (principal place of business): 5601 Granite Parkway, Ste. 1100 Plano, TX 75024 Physical address (principal place of business): 5601 Granite Parkway, Ste. 1100 Plano, TX 75024 Surety is a corporation organized and existing under the laws of the state of: Texas By submitting this Bond, Surety affirms its authority to do business in the State of Texas and its license to execute bonds in the State of Texas. Telephone (main number): 972-930-0641 Telephone (for notice of claim): 1-800-486-6695 Local Agent for Surety Name: Cam Fletcher Address: 5601 Granite Parkway, Ste. 1100 Plano, TX 75024 Telephone: 972/ 930-0641 Email Address: CFLETCHER@hcc.com The address of the surety company to which any notice of claim should be sent may be obtained from the Texas Dept. of Insurance by calling the following toll-free number: 1-800-252-3439 Payment Bond Form E16271 Ralston Ave Impr — Staples to Alameda 006116-1 7-8-2014 Surety and Contractor, intending to be legally bound and obligated to Owner do each cause this Payment Bond to be duly executed on its behalf by its authorized officer, agent or representative. The Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally to this bond. The condition of this obligation is such that if the Contractor as Principal pays all claimants providing labor or materials to him or to a Subcontractor in the prosecution of the Work required by the Contract then this obligation shall be null and void; otherwise the obligation is to remain in full force and effect. Provisions of the bond shall be pursuant to the terms and provisions of Chapter 2253 and Chapter 2269 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter to the same extent as if it were copied at length herein. Venue shall lie exclusively in Nueces County, Texas for any legal action. Contractor as Principal JE Construction Services, LLC Signature: Name: C.�"t, T' 46 /6-7Z,E Title: vF Email Address: qrm. .01 f-ca)oic c S. C..c Surety U.S. Specialty Insurance Company Signatur Name: Title: Robert G. Kanuth Attorney -in -Fact Email Address: RKanuth@kandsins.com (Attach Power of Attorney and place surety seal below) END OF SECTION Payment Bond Form E16271 Ralston Ave Impr — Staples to Alameda 006116-2 7-8-2014 U.S. Specialty Insurance Company TEXAS COMPLAINT NOTICE AVISO IMPORTANTE Para obtener informacion o para someter una queja: Puede comunicarse con su agente. IMPORTANT NOTICE 1. To obtain information or make a complaint: 2. You may contact your agent. 3. You may call the company's toll free telephone number for information or to make a complaint at: 1-800-486-6695 4. You may also write to the company at: 801 S. Figueroa Street, Suite 700 Los Angeles, CA 90017 5. You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights, or complaints at: 1-800-252-3439 6. You may write to the Texas Department of Insurance at: Consumer Protection (111-1A) P.O. Box 149091 Austin, TX 78714-9091 Fax No. (512) 490-1007 Web: http://www.tdi.texas.gov E-mail: ConsumerProtection,tdi.texas.gov 7. PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent or the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. 8. ATTACH THIS NOTICE TO YOUR POLICY This notice is for information only and does not become a part or condition of the attached document. Usted puede llamar al numero de telefono gratis de la compania's para informacion o para someter una queja al: 1-800-486-6695 Usted tambien puede escribir a la compania: 801 S. Figueroa Street, Suite 700 Los Angeles, CA 90017 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companias, coberturas, derechos, o quejas al: 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas al: Consumer Protection (111-1A) P.O. Box 149091 Austin, TX 78714-9091 Fax No. (512) 490-1007 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection@tdi.texas.gov DISPUTAS SOBRE PRIMAS 0 RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente o la compania primero. Si no se resuelve la disputa, puede entonces comunicarse con el departamento (TDI). UNA ESTE AVISO A SU POLIZA Esta aviso es solo para proposito de informacion y no se convierte en parte o condicion del documento adjunto. POWER OF ATTORNEY AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY KNOW ALL MEN BY THESE PRESENTS: That American Contractors Indemnity Company, a California corporation, Texas Bonding Company, an assumed name of American Contractors Indemnity Company, United States Surety Company, a M aryland corporation and U.S. Specialty Insurance Company, a Texas corporation (collectively, the "Companies"), do by these presents make, constitute and appoint: Johnny Moss, Jay Jordan, Tony Fierro, Jeremy Barnett, Jade Porter, Mistie Beck, Robert G. Kanuth or Jarrett Willson of Rockwall, Texas its true and lawful Attorney(s)-in-fact, each in their separate capacity if more than one is named above, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include riders, amendments, and consents of surety, providing the bond penalty does not exceed *********************Ten Million********************* Dollars (S **10,000,000.00**. This Power of Attorney shall expire without further action on November 3,2019. This Power of Attorney is granted under and by authority of the following resolutions adopted by the Boards of Directors of the Companies: Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attomey(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney -in -Fact may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings, including any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts, and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney -in -Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. IN WITNESS WHEREOF, The Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this 1st day of November, 2016. AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY Corporate Seals ,puicTo In,44 -oo. µ'o4 =ui nwL,owto - OS Sui ELI; cr. mnnua` °'eaD1ING' J'r9Te OF S�+Pg`�: Imuwrr,a`°�, By: Daniel P. Aguilar, Vice President A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Los Angeles SS: On this 1st day of November, 2016, before me, Sabina Morgenstein, a notary public, personally appeared Daniel P. Aguilar, Vice President of American Contractors Indemnity Company, Texas Bonding Company, United States Surety Company and U.S. Specialty Insurance Company who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature (Seal) SABINA MORGENSTEIN Commission # 2129258 Notary Public - California Los Angeles County My Comm. Exolrea Nov 3. 2019 I, Kio Lo, Assistant Secretary of American Contractors Indemnity -Company, Texas Bonding Company, United States Surety Company and U.S.= Specialty Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies, which is still in full force and effect; furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are in full force and effect. In Witn s Whereof, I have hereunto set my hand and affixed the seals of said Companies at Los Angeles, California this day of 4us .��. Corporate Seals Bond No. 1001 o%:a.o `,,,ululllnrl„r”�„ul rp.,l T µI.CT... `SS SUR�c4 aB "� 3Vse".rcarouisE-- W'_ �f. riw,ls Agency 17042 No. Kio Lo, Assistant Secretary 1 Kan't Kopy K1 Security Paper • Hidden Pantograph • Color Match • Artificial Watermark • Anti -Copy Coin Rub • Erasure Protection • Security Features Box • Microprint Protection • Acid Free Kan't Kopy K1 Security Paper • Hidden Pantograph • Color Match • Artificial Watermark • Anti -Copy Coin Rub • Erasure Protection • Security Features Box • Microprint Protection • Acid Free Kan't Kopy" K1 Security Paper • Hidden Pantograph • Color Match • Artificial Watermark • Anti -Copy Coin Rub • Erasure Protection • Security Features Box • Microprint Protection • Acid Free Kan't Kopy K1 Security Paper • Hidden Pantograph • Color Match • • Artificial Watermark • Anti -Copy Coin Rub • Erasure Protection • Security Features Box • Microprint Protection • Acid Free 00 6113 PERFORMANCE BOND BOND NO. 1001087220 Contractor as Principal Name: JE Construction Services Mailing address (principal place of business): 11309 Leopard St., Unit E Corpus Christi, TX 78410 Owner Name: City of Corpus Christi, Texas Mailing address (principal place of business): Engineering Services 1201 Leopard Street Corpus Christi, Texas 78469 Contract Project name and number: E16271 Ralston Avenue Improvements — Staples to Alameda Award Date of the Contract: August 8, 2017 Contract Price: $1,453,476.33 Bond Date of Bond: August 14, 2017 (Date of Bond cannot be earlier than Award Date of the Contract) Surety Name: U.S. Specialty Insurance Company Mailing address (principal place of business): 5601 Granite Parkway, Ste. 1100 Plano, TX 75024 Physical address (principal place of business): 5601 Granite Parkway, Ste. 1100 Plano, TX 75024 Surety is a corporation organized and existing under the laws of the state of: Texas By submitting this Bond, Surety affirms its authority to do business in the State of Texas and its license to execute bonds in the State of Texas. Telephone (main number): 972-930-0641 Telephone (for notice of claim): 1-800-486-6695 Local Agent for Surety Name: Cam Fletcher Address: 5601 Granite Parkway, Ste. 1100 Plano, TX 75024 Telephone: 972/ 930-0641 Email Address: CFLETCHER@hcc.com The address of the surety company to which any notice of claim should be sent may be obtained from the Texas Dept. of Insurance by calling the following toll-free number: 1-800-252-3439 Performance Bond E16274 Ralston Ave Impr — Staples to Alameda 006113-1 7-8-2014 Surety and Contractor, intending to be legally bound and obligated to Owner do each cause this Performance Bond to be duly executed on its behalf by its authorized officer, agent or representative. The Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns, jointly and severally to this bond. The condition of this obligation is such that if the Contractor as Principal faithfully performs the Work required by the Contract then this obligation shall be null and void; otherwise the obligation is to remain in full force and effect. Provisions of the bond shall be pursuant to the terms and provisions of Chapter 2253 and Chapter 2269 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter to the same extent as if it were copied at length herein. Venue shall lie exclusively in Nueces County, Texas for any legal action. Contractor as PrincipalJE Construction Services, LLC Surety U.S. Specialty Insurance Company t Signature: Signature. Name: C; r / iffier Name: Robert G. Kanuth Title: yr Title: Attorney-in-Fact Email Address:• ,i e,,, 4-cDde c s. [ c. Email Address: RKanuth@kandsins.com (Attach Power of Attorney and place surety seal below) END OF SECTION Performance Bond E16274 Ralston Ave Impr — Staples to Alameda 006113-2 7-8-2014 U.S. Specialty Insurance Company TEXAS COMPLAINT NOTICE AVISO IMPORTANTE Para obtener informacion o para someter una queja: Puede comunicarse con su agente. IMPORTANT NOTICE 1. To obtain information or make a complaint: 2. You may contact your agent. 3. You may call the company's toll free telephone number for information or to make a complaint at: 1-800-486-6695 4. You may also write to the company at: 801 S. Figueroa Street, Suite 700 Los Angeles, CA 90017 5. You may contact the Texas Department of Insurance to obtain information on companies, coverages, rights, or complaints at: 1-800-252-3439 6. You may write to the Texas Department of Insurance at: Consumer Protection (111-1A) P.O. Box 149091 Austin, TX 78714-9091 Fax No. (512) 490-1007 Web: http://www.tdi.texas.gov E-mail: ConsumerProtection@tdi.texas.gov 7. PREMIUM OR CLAIM DISPUTES: Should you have a dispute concerning your premium or about a claim you should contact the agent or the company first. If the dispute is not resolved, you may contact the Texas Department of Insurance. 8. ATTACH THIS NOTICE TO YOUR POLICY This notice is for information only and does not become a part or condition of the attached document. Usted puede llamar al numero de telefono gratis de la compania's para informacion o para someter una queja al: 1-800-486-6695 Usted tambien puede escribir a la compania: 801 S. Figueroa Street, Suite 700 Los Angeles, CA 90017 Puede comunicarse con el Departamento de Seguros de Texas para obtener informacion acerca de companias, coberturas, derechos, o quejas al: 1-800-252-3439 Puede escribir al Departamento de Seguros de Texas al: Consumer Protection (111-1A) P.O. Box 149091 Austin, TX 78714-9091 Fax No. (512) 490-1007 Web: http://www.tdi.state.tx.us E-mail: ConsumerProtection(u7tdi.texas.gov DISPUTAS SOBRE PRIMAS 0 RECLAMOS: Si tiene una disputa concerniente a su prima o a un reclamo, debe comunicarse con el agente o la compania primero. Si no se resuelve la disputa, puede entonces comunicarse con el departamento (TDI). UNA ESTE AVISO A SU POLIZA Esta aviso es solo para proposito de informacion y no se convierte en parte o condicion del documento adjunto. POWER OF ATTORNEY AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY KNOW ALL MEN BY THESE PRESENTS: That American Contractors Indemnity Company, a California corporation, Texas Bonding Company, an assumed name of American Contractors Indemnity Company, United States Surety Company, a M aryland corporation and U.S. Specialty Insurance Company, a Texas corporation (collectively, the "Companies"), do by these presents make, constitute and appoint: Johnny Moss, Jay Jordan, Tony Fierro, Jeremy Barnett, Jade Porter, Mistie Beck, Robert G. Kanuth or Jarrett Willson of Rockwall, Texas its true and lawful Attorney(s)-in-fact, each in their separate capacity if more than one is named above, with full power and authority hereby conferred in its name, place and stead, to execute, acknowledge and deliver any and all bonds, recognizances, undertakings or other instruments or contracts of suretyship to include riders, amendments, and consents of surety, providing the bond penalty does not exceed *********************Ten Million********************* Dollars ($ **10,000,000.00**). This Power of Attorney shall expire without further action on November 3,2019. This Power of Attorney is granted under and by authority of the following resolutions adopted by the Boards of Directors of the Companies: Be it Resolved, that the President, any Vice -President, any Assistant Vice -President, any Secretary or any Assistant Secretary shall be and is hereby vested with full power and authority to appoint any one or more suitable persons as Attorney(s)-in-Fact to represent and act for and on behalf of the Company subject to the following provisions: Attorney -in -Fact may be given full power and authority for and in the name of and on behalf of the Company, to execute, acknowledge and deliver, any and all bonds, recognizances, contracts, agreements or indemnity and other conditional or obligatory undertakings, including any and all consents for the release of retained percentages and/or final estimates on engineering and construction contracts, and any and all notices and documents canceling or terminating the Company's liability thereunder, and any such instruments so executed by any such Attorney -in -Fact shall be binding upon the Company as if signed by the President and sealed and effected by the Corporate Secretary. Be it Resolved, that the signature of any authorized officer and seal of the Company heretofore or hereafter affixed to any power of attorney or any certificate relating thereto by facsimile, and any power of attorney or certificate bearing facsimile signature or facsimile seal shall be valid and binding upon the Company with respect to any bond or undertaking to which it is attached. IN WITNESS WHEREOF, The Companies have caused this instrument to be signed and their corporate seals to be hereto affixed, this 1st day of November, 2016. AMERICAN CONTRACTORS INDEMNITY COMPANY TEXAS BONDING COMPANY UNITED STATES SURETY COMPANY U.S. SPECIALTY INSURANCE COMPANY Corporate Seals w.,.,,.,..o By: Daniel P. Aguilar, Vice President A notary public or other officer completing this certificate verifies only the identity of the individual who signed the document to which this certificate is attached, and not the truthfulness, accuracy, or validity of that document. State of California County of Los Angeles SS: On this 1st day of November, 2016, before me, Sabina Morgenstein, a notary public, personally appeared Daniel P. Aguilar, Vice President of American Contractors Indemnity Company, Texas Bonding Company, United States Surety Company and U.S. Specialty Insurance Company who proved to me on the basis of satisfactory evidence to be the person whose name is subscribed to the within instrument and acknowledged to me that he executed the same in his authorized capacity, and that by his signature on the instrument the person, or the entity upon behalf of which the person acted, executed the instrument. I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph is true and correct. WITNESS my hand and official seal. Signature (Seal) SABINA MORGENSTEIN Commission # 2129256 Notary Public - California Los Angeles County My Comm. ExDIres Nov 3, 2019 I, Kio Lo, Assistant Secretary of American Contractors Indemnity Company, Texas Bonding Company, United States Surety Company and U.S. Specialty Insurance Company, do hereby certify that the above and foregoing is a true and correct copy of a Power of Attorney, executed by said Companies, which is still in full force and effect; furthermore, the resolutions of the Boards of Directors, set out in the Power of Attorney are in full force and effect. In Witn s Wher of, I have hereunto set my hand and affixed the seals of said Companies at Los Angeles, California this of U �vs Corporate Seals Bond No. to610%10.a.O Agency No. 17042 OCCRPOMIED WT. Ol. MO noa day Kio Lo, Assistant Secretary Kan't Kopy` K1 ,\\ sjiI Security Paper • Hidden Pantograph • Color Match • Artificial Watermark • Anti -Copy Coin Rub • Erasure Protection • Security Features Box • Microprint Protection • Acid Free 1 I i Kan't Kopy• K1 j Security Paper Kan't Kopy K1 Security Paper • Hidden Pantograph • Color Match • Artificial Watermark • Anti -Copy Coin Rub • Erasure Protection • Security Features Box • Microprint Protection • Acid Free • Hidden Pantograph • Color Match • Artificial Watermark • Anti -Copy Coin Rub • Erasure Protection • Security Features Box • Microprint Protection • Acid Free Kan't Kopy K1 Security Paper • Hidden Pantograph • Color Match • Artificial Watermark • Anti -Copy Coin Rub • Erasure Protection • Security Features Box • Microprint Protection • Acid Free