Loading...
HomeMy WebLinkAboutC2020-024 - 1/17/2020 - NA ‘;,,,US10 n • CITY OF CORPUS CHRISTI I - AMENDMENT NO. 2 to the CONTRACT FOR PROFESSIONAL SERVICES . The City of Corpus Christi, Texas, hereinafter called "CITY," and LJA Engineering, hereinafter called "CONSULTANT," agree to the following amendment to the Contract for Professional Services for Morgan Avenue from Ocean Drive to Staples Street BOND 2014(Project No. El 3090). Original Contract February 11, 2014 Ordinance No. 030086 $568,425.00 Amendment No. 1 November 15, 2019 Administrative Approval $49,765.00 IN THE ORIGINAL CONTRACT, EXHIBIT A, SCOPE OF SERVICES, shall be amended as set forth in the attached Amendment No. 2, Exhibit A_ Inthe Original Contract, Article Ill Compensation shall be amended based on the modified scope of services in the attached Amendment No. 2, Exhibit A for a fee not to exceed $41,020.00 for a total restated fee not to exceed $659,210.00. All other terms and conditions of the February 11, 2014 Contract for Professional Services between the City and Consultant, and of any amendments to that contract, which are not specifically addressed herein shall remain in full force and effect. CITY OF CORPUS CHRISTI LJA N RING . . Ilio/Zola Michael Rodriguez Date 7 oym, P. E. Date Chief of Staff ice President 5350 South Staples Street, Suite 425 Corpus Christi, TX 78411 APPROVED AS TO LEGAL FORM (361) 991-8550 Office Aimee Alcorn-Reed jcoym@lja.com 2020.01.15 16:25:16-06'00' Assistant City Attorney Date Fund Name Accounting Account Activity No. Amount Unit No. WW Capital Resv 4510-042 550950 E13090-01-4510-EXP $41,020.00 Total $41_020.00 SCANNED 114 5350 South Staples Street,Suite 425,Corpus Christi,Texas 78411 LJA ENGINEERING t 361.991.8550 LJA.com TBPE F-1386 TBPLS 10016600 April 8, 2019 City of Corpus Christi Engineering Services AMENDMENT NO. 2 Po Box 9277 Corpus Christi, Texas 78469-9277 Attn: Ms. Sarah West, PE Project Manager RE: Engineering Services Agreement Between City of Corpus Christi and LJA Engineering, Inc. Morgan Avenue (Ocean to Staples)— Project No. E13090 Contract Amendment No. 2— Design Phase LJA Proposal No. 19-01130-CO2 / LJA Project No. C007-20765c Dear Ms. West, I. SCOPE OF WORK We have prepared Contract Amendment No. 2 (CA1) to our Morgan Avenue (Ocean to Staples) A/E Contract to cover additionally requested Design Phase engineering efforts to: Basic Services (2. Design Phase) A. Design wastewater gravity line replacement and manholes for the lines running perpendicular to Morgan Avenue at the following intersections (121h 7th 6th 5th 3rd Spohn Hospital Alley) II. CONTRACT CONDITIONS LJA will perform the above-described work for the fees established below and shown in the attached manhour analysis. Any engineering efforts requested outside of the stated scope of work will require another amendment to the contract and additional fees. III. BASIS OF COMPENSATION LJA proposes to perform the above-described scope of work for a Lump Sum fee of $41,020.00 as shown on the attached "Summary of Fees" and described herein. R:\BP'S-OPPORTUNITIES(ENGINEERING)\2019\19-01130-0O2-City of CC Morgan Avenue(C0-2 Ocean to Staples) E13090\19-01130-0O2(E13090)Amendment No.2.docx AMD NO.2 EXHIBIT'A' Page 1 of 2 Ms. Sarah West, PE City of Corpus Christi April 8, 2019 TASK FEE BASIC SERVICES (2. Design Phase) A. Design WW Gravity Line Replacement& Manholes for Perpendicular Lines to Morgan at Intersections(12th 7th, 6t'', 51h 3rd& Spohn Hospital $41,020.00 Alley) TOTAL DESIGN PHASE AND AMENDMENT NO. 2 $41,020.00 IV. SCHEDULE OF PAYMENT Invoices shall be prepared, submitted and paid on a monthly basis in accordance with the Original Contract. Invoices will be based upon engineering efforts spent at the time of invoicing. Contract Amendment No. 2 documents are attached. We appreciate the opportunity to provide these engineering services to you. If you have any questions regarding this Contract Amendment, or need any additional information, please do not hesitate to contact me at 361.991.8550. Sincerely, LJA Engineering, Inc. /, 4/g//, ,"• �� ` oym, PE Date Vice President JCC/pjk Attachments R:\BP'S-OPPORTUNITIES(ENGINEERING)\2019119-01130-0O2-City of CC Morgan Avenue(CO-2 Ocean to Staples) E13090\19-01130-CO2(El 3090)Amendment No.2.docx AMD NO.2 EXHIBIT'A' Page 2 of 2 Morgan Avenue from Staples Street to Ocean Drive BOND 2014 Project No. E13090 Summary of Fees Original Contract Amendment No. 1 Amendment No.2 Total Basic Services 1 Preliminary Phase $126,740.00 $0.00 $0.00 $126,740.00 2 Design Phase 208,480.00 49,765.00 41,020.00 299,265.00 3 Bid Phase 12,530.00 0.00 0.00 12,530.00 4 Construction Administration Phase 68,975.00 0.00 0.00 68,975.00 Subtotal Basic Services 416,725.00 49,765.00 41,020.00 507,510.00 Additional Services 1 Permit Preparation 2,540.00 0.00 0.00 2,540.00 2 ROW Acquisition Survey 25,090.00 0.00 0.00 25,090.00 3 Topographic Survey and Parcel 50,130.00 0.00 0.00 50,130.00 Descriptions 4 Environmental Issues 4,100.00 0.00 0.00 4,100.00 5 Public Involvement 8,820.00 0.00 0.00 8,820.00 6 Subsurface Utility Investigation 51,075.00 0.00 0.00 51,075.00 7 Construction Observation Services TBD 0.00 0.00 0.00 8 Warranty Phase 9,945.00 0.00 0.00 9,945.00 Subtotal Additional Services 151,700.00 0.00 0.00 151,700.00 Total Authorized Fee $568,425.00 $49,765.00 $41,020.00 $659,210.00 02/11/14 11/15/19 Ord. 030086 Admin. Appproval D K m z 0 mxm co 2 z CD m H -, = z o _ O BOJ N