n • CITY OF CORPUS CHRISTI
I - AMENDMENT NO. 2 to the
CONTRACT FOR PROFESSIONAL SERVICES
.
The City of Corpus Christi, Texas, hereinafter called "CITY," and LJA Engineering, hereinafter called
"CONSULTANT," agree to the following amendment to the Contract for Professional Services for
Morgan Avenue from Ocean Drive to Staples Street BOND 2014(Project No. El 3090).
Original Contract February 11, 2014 Ordinance No. 030086 $568,425.00
Amendment No. 1 November 15, 2019 Administrative Approval $49,765.00
IN THE ORIGINAL CONTRACT, EXHIBIT A, SCOPE OF SERVICES, shall be amended as set forth in
the attached Amendment No. 2, Exhibit A_
Inthe Original Contract, Article Ill Compensation shall be amended based on the modified scope of
services in the attached Amendment No. 2, Exhibit A for a fee not to exceed $41,020.00 for a total
restated fee not to exceed $659,210.00.
All other terms and conditions of the February 11, 2014 Contract for Professional Services between the
City and Consultant, and of any amendments to that contract, which are not specifically addressed
herein shall remain in full force and effect.
CITY OF CORPUS CHRISTI LJA N RING
. . Ilio/Zola
Michael Rodriguez Date 7 oym, P. E. Date
Chief of Staff ice President
5350 South Staples Street, Suite 425
Corpus Christi, TX 78411
APPROVED AS TO LEGAL FORM (361) 991-8550 Office
Aimee Alcorn-Reed jcoym@lja.com
2020.01.15 16:25:16-06'00'
Assistant City Attorney Date
Fund Name Accounting Account Activity No. Amount
Unit No.
WW Capital Resv 4510-042 550950 E13090-01-4510-EXP $41,020.00
Total $41_020.00
SCANNED
114
5350 South Staples Street,Suite 425,Corpus Christi,Texas 78411
LJA ENGINEERING t 361.991.8550 LJA.com TBPE F-1386 TBPLS 10016600
April 8, 2019
City of Corpus Christi
Engineering Services AMENDMENT NO. 2
Po Box 9277
Corpus Christi, Texas 78469-9277
Attn: Ms. Sarah West, PE
Project Manager
RE: Engineering Services Agreement Between
City of Corpus Christi and LJA Engineering, Inc.
Morgan Avenue (Ocean to Staples)— Project No. E13090
Contract Amendment No. 2— Design Phase
LJA Proposal No. 19-01130-CO2 / LJA Project No. C007-20765c
Dear Ms. West,
I. SCOPE OF WORK
We have prepared Contract Amendment No. 2 (CA1) to our Morgan Avenue (Ocean to Staples)
A/E Contract to cover additionally requested Design Phase engineering efforts to:
Basic Services (2. Design Phase)
A. Design wastewater gravity line replacement and manholes for the lines running
perpendicular to Morgan Avenue at the following intersections (121h 7th 6th 5th 3rd Spohn
Hospital Alley)
II. CONTRACT CONDITIONS
LJA will perform the above-described work for the fees established below and shown in the
attached manhour analysis. Any engineering efforts requested outside of the stated scope of
work will require another amendment to the contract and additional fees.
III. BASIS OF COMPENSATION
LJA proposes to perform the above-described scope of work for a Lump Sum fee of $41,020.00
as shown on the attached "Summary of Fees" and described herein.
R:\BP'S-OPPORTUNITIES(ENGINEERING)\2019\19-01130-0O2-City of CC Morgan Avenue(C0-2 Ocean to Staples)
E13090\19-01130-0O2(E13090)Amendment No.2.docx AMD NO.2
EXHIBIT'A'
Page 1 of 2
Ms. Sarah West, PE
City of Corpus Christi
April 8, 2019
TASK FEE
BASIC SERVICES (2. Design Phase)
A. Design WW Gravity Line Replacement& Manholes for Perpendicular
Lines to Morgan at Intersections(12th 7th, 6t'', 51h 3rd& Spohn Hospital $41,020.00
Alley)
TOTAL DESIGN PHASE AND AMENDMENT NO. 2 $41,020.00
IV. SCHEDULE OF PAYMENT
Invoices shall be prepared, submitted and paid on a monthly basis in accordance with the Original
Contract. Invoices will be based upon engineering efforts spent at the time of invoicing.
Contract Amendment No. 2 documents are attached. We appreciate the opportunity to provide
these engineering services to you. If you have any questions regarding this Contract Amendment,
or need any additional information, please do not hesitate to contact me at 361.991.8550.
Sincerely,
LJA Engineering, Inc.
/, 4/g//,
,"• �� ` oym, PE Date
Vice President
JCC/pjk
Attachments
R:\BP'S-OPPORTUNITIES(ENGINEERING)\2019119-01130-0O2-City of CC Morgan Avenue(CO-2 Ocean to Staples)
E13090\19-01130-CO2(El 3090)Amendment No.2.docx AMD NO.2
EXHIBIT'A'
Page 2 of 2
Morgan Avenue from Staples Street to Ocean Drive BOND 2014
Project No. E13090
Summary of Fees
Original Contract Amendment No. 1 Amendment No.2 Total
Basic Services
1 Preliminary Phase $126,740.00 $0.00 $0.00 $126,740.00
2 Design Phase 208,480.00 49,765.00 41,020.00 299,265.00
3 Bid Phase 12,530.00 0.00 0.00 12,530.00
4 Construction Administration Phase 68,975.00 0.00 0.00 68,975.00
Subtotal Basic Services 416,725.00 49,765.00 41,020.00 507,510.00
Additional Services
1 Permit Preparation 2,540.00 0.00 0.00 2,540.00
2 ROW Acquisition Survey 25,090.00 0.00 0.00 25,090.00
3 Topographic Survey and Parcel 50,130.00 0.00 0.00 50,130.00
Descriptions
4 Environmental Issues 4,100.00 0.00 0.00 4,100.00
5 Public Involvement 8,820.00 0.00 0.00 8,820.00
6 Subsurface Utility Investigation 51,075.00 0.00 0.00 51,075.00
7 Construction Observation Services TBD 0.00 0.00 0.00
8 Warranty Phase 9,945.00 0.00 0.00 9,945.00
Subtotal Additional Services 151,700.00 0.00 0.00 151,700.00
Total Authorized Fee $568,425.00 $49,765.00 $41,020.00 $659,210.00
02/11/14 11/15/19
Ord. 030086 Admin. Appproval
D
K
m
z
0
mxm
co 2 z
CD m H
-, = z
o _ O
BOJ N