HomeMy WebLinkAboutC2020-028 - 1/14/2020 - NA CITY OF CORPUS CHRISTI
AMENDMENT NO. 3
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi,Texas, a Texas home-rule municipal corporation("City")and Freese and Nichols,Inc.
("Consultant"),agree to the following amendments to the Contract for Professional Services for Downtown Street
Traffic Signals and Area Improvements BOND 2014 (Project No. El 51081:
Original Contract October 18, 2016 Motion No. M2016-137 $334,275.00
Amendment No. 1 December 28, 2016 Administrative Approval $35,236.00
Amendment No. 2 January 7, 2019 Administrative Approval $10,010.00
In the Original Contract, Exhibit"A", Section I. Scope of Services shall be amended as set forth in the attached
Amendment No. 3, Exhibit"A".
In the Original Contract, Section III shall be amended based on the modified scope of services in the attached
Amendment No. 3, Exhibit "A" for a fee not to exceed $47,561.00, for a total restated fee not to exceed
$427,082.00.
All other terms and conditions of the October 18, 2016 Contract for Professional Services between the City and
Consultant, and of any amendments to that contract,which are not specifically addressed herein shall remain in full
force and effect.
CITY OF CORPUS CHRISTI F- E A NICHOLS, INC.
P
_iy __ � January 6, 2020
Michael Rodriguez Date R. Guz an, P.E. Date
Chief of Staff PrincipalNice President
800 N. Shoreline Blvd., Suite 1600N
Corpus Christi, TX 78401
APPROVED AS TO LEGAL FORM (361) 561-6500
Aimee Alcorn-Reed rg@freese.com
2020.01.08 13:03:57-06'00'
Assistant City Attorney Date
A ST -
tf-tAZask 6-3 /aziou
City ecretary Date
Project No. E15108
Accounting Unit 3551-051
Account 550950
Activity El 5108-01-3551-EXP
Fund Name ST 2015 GO Bond 2014
SCANNED
r7FREESE
NICHOLS
800 N.Shoreline Blvd.,Suite 1600N • Corpus Christi,Texas 78401 • 361-561-6500 • fax 361-561-6501 www.freese.com
October 25, 2019
Mr.Jeff Edmonds, P.E.
Director of Engineering Services
City of Corpus Christi
P.O. Box 9277
Corpus Christi,TX 78469
RE: Downtown Streets Traffic Signal and Area Improvements (Bond 2014)-Amendment No. 3
City Project No. E15108
Design of Downtown Streets 2-Way Conversion project(City PN: 19004A)
Dear Mr. Edmonds,
Freese and Nichols, Inc. (FNI) is pleased to submit an amendment to our professional services contract to
provide additional design phase services for the Downtown Streets Traffic Signal and Area Improvements
(Bond 2014)for your consideration. This amendment includes additional design effort to prepare plans for
the downtown two-way conversions of Starr Street, Peoples Street,Schatzell Street,William Street,and
John Sartain Street between Water Street and Shoreline Boulevard. The project limits are shown on the
attached Exhibit A. This amendment will include the following services:
Design Phase
1. Review available reports, record drawings, utility maps and other information provided by the
City pertaining to the project area.
2. Provide site investigation,data collection for Starr Street, Peoples Street, Schatzell Street,William
Street,and John Sartain Street between Water Street and Shoreline Boulevard.
3. Coordinate improvements with the City's Project Manager, Traffic Engineering and the Streets
Department. Identify operating departments potential project needs.
4. Prepare preliminary sequencing and traffic control drawings
5. Anticipated Drawing Register for the Downtown Two-Way Street Conversions are as follows:
• Title Sheet/Drawing Index
• General Notes Sheet
• Project Location Map
• Starr- Removal/Demo Plan
• Starr-Fog Seal/Pavement Plan
• Starr-Striping Plan
• Starr-Signage Plan
• Peoples-Removal/Demo Plan
• Peoples- Fog Seal/Pavement Plan
• Peoples-Striping Plan
• Peoples-Signage Plan AMEND. NO. 3
EXHIBIT "A"
Page 1 of 3
•
• Schatzell - Removal/Demo Plan
• Schatzell - Fog Seal/Pavement Plan
• Schatzell -Striping Plan
• Schatzell -Signage Plan
• William - Removal/Demo Plan
• William - Fog Seal/Pavement Plan
• William -Striping Plan
• William -Signage Plan
• John Sartain - Removal/Demo Plan
• John Sartain -Fog Seal/Pavement Plan
• John Sartain -Striping Plan
• John Sartain-Signage Plan
• Traffic Control Advanced Warning Signage 01
• Traffic Control Advanced Warning Signage 02
• Construction Sequencing Layout
• Sequence of Construction and General Notes
• Traffic Control—Starr Street
• Traffic Control—Peoples Street
• Traffic Control—Schatzell Street
• Traffic Control—William Street
• Traffic Control—John Sartain Street
• Barricade and Construction Sheets
6. FNI will prepare an updated quantity summary and opinion of probable construction cost based on
the contractor's unit prices.
7. FNI will submit the draft delivery order to the City Project Manager for review.
8. FNI will attend one(1) site visit with City staff and contractor for the review of the draft delivery
order.
9. FNI will submit the final delivery order to the City Project Manager based on City's and contractor's
feedback.
10. FNI will attend one (1) meeting with the City and contractor for the review of the delivery order.
11. FNI will respond to requests for information (RFI's)that arise during the construction process.
Project Assumptions:
a. The project will be constructed through the City's Minor Streets IDIQ project as a delivery order.
Drawings and applicable City specifications will be provided. All required contract documents will
be prepared by City.
b. Traffic signalization design and coordination is not included in this amendment. Recommended
modifications to existing signage on the traffic signals will be included as part of this design.
c. The traffic control plan is assumed to include temporary closures for each street to through traffic
for the fog seal and striping work. If detailed traffic control is needed for partial access,this effort
can be included as an additional service.
d. Traffic analysis for the two-way conversions is not included in this amendment.
e. Topographic Survey and ROW Acquisition is not included in this amendment.
f. Construction Phase Services included in this amendment are limited to RFI support.
g. Public meetings, permitting, and warranty phase services are not included in this amendment.
h. Coordination for parking meter bagging and/or removal is not included in this amendment.
AMEND. NO. 3
EXHIBIT "A"
Page 2 of 3
•
Schedule
Date Activity
Within 10 weeks of receipt of
NTP Submit draft delivery order
Within 2 weeks of receipt of City
comments on draft delivery order Submit final delivery order
Freese and Nichols, Inc. respectfully requests a lump sum fee in the amount of$47,561.00 to perform
these services.
Please feel free to contact me at 361.561.6500 should you have any questions regarding this matter.
Sincerely
Ron Guzman, P.E.
Vice President/Principal
AMEND. NO. 3
EXHIBIT"A"
Page 3 of 3
Downtown Street Traffic Signals and Area Improvements (Bond 2014)
Project No. E15108
Freese and Nichols
1 Original Amend. No. 1 Amend. No. 2 Amend. No. 3 Total
Basic Services
1 Preliminary Phase $0.00 $0.00 $0.00 $0.00 $0.00
2 Design Phase 214,794.00 0.00 10,010.00 44,353.00 269,157.00
3 Bid Phase 9,438.00 0.00 0.00 0.00 9,438.00
4 Construction Phase 43,794.00 0.00 0.00 3,208.00 47,002.00
Subtotal Basic Services 268,026.00 0.00 10,010.00 47,561.00 325,597.00
Additional Services
1 Permit Preparation 4,335.00 0.00 0.00 0.00 4,335.00
2 Topographic Survey 5,442.00 35,236.00 0.00 0.00 40,678.00
and Parcel Descriptions
3 ROW Acquisition 6,192.00 0.00 0.00 0.00 6,192.00
Survey
4 Geotechnical 3,232.00 0.00 0.00 0.00 3,232.00
Investigation
5 Subsurace Utility 6,509.00 0.00 0.00 0.00 6,509.00
Investigation
6 Traffic Control Planning 17,673.00 0.00 0.00 0.00 17,673.00
and Design
7 Public Involvement 16,726.00 0.00 0.00 0.00 16,726.00
8 Warranty Phase 6,140.00 0.00 0.00 0.00 6,140.00
9 Construction 0.00 0.00 0.00 0.00 0.00
Observation Services
Subtotal Additional Services 66,249.00 35,236.00 0.00 0.00 101,485.00
Total $334,275.00 $35,236.00 $10,010.00 $47,561.00 $427,082.00