HomeMy WebLinkAboutC2020-124 - 2/26/2020 - NA f• Q
• FEBRUARY 25,2020
PRIVILEGED&CONFIDENTIAL
STATE OF TEXAS §
COUNTY OF TRAVIS §
FIRST AMENDMENT TO THE AGREEMENT FOR THE ADJUSTMENT OF CITY OF
CORPUS CHRISTI MUNICIPAL UTILITIES IN CONNECTION WITH THE US 181
HARBOR BRIDGE REPLACEMENT PROJECT
THIS FIRST AMENDMENT (the"First Amendment")to the Agreement for the Adjustment of
City of Corpus Christi Municipal Utilities in Connection with the US 181 Harbor Bridge
Replacement Project is made by and between the State of Texas("State"),acting through the Texas
Department of Transportation("TxDOT")and the City of Corpus Christi,Texas("City"), in order
to facilitate the adjustment of municipal utility facilities associated with the US 181 Harbor Bridge
Replacement Project.
WITNESSETH
WHEREAS, TxDOT and the City are parties to the Agreement for the Adjustment of City of
Corpus Christi Municipal Utilities in Connection with the US 181 Harbor Bridge Replacement
Project, effective as of February 16, 2016 (the"Agreement");
WHEREAS, in the Agreement, as part of its local contribution to the Project, the City agreed to
pay all of the City Adjustment Costs, notwithstanding that some of the City Adjustment Costs
might normally be reimbursable by the State pursuant to § 203.092 of the Texas Transportation
Code;
WHEREAS,in the Agreement,the parties agreed to a"preliminary agreed sum"of$8,966,450.00,
which was the parties'preliminary estimate of the City Adjustment Costs,based on the preliminary
scope and costs available at that time;
WHEREAS, Section 3.A.(3) of the Agreement provided that once the scope and costs were
finalized, the Agreement would be amended to include the "final agreed sum," which would be
the agreed final lump sum for the City Adjustment Costs that the City would pay;
WHEREAS, once the scope and costs were finalized, the "final agreed sum" was determined to
be substantially in excess of what either party anticipated when the Agreement was executed;
WHEREAS, the parties desire to amend the Agreement to provide for a sharing of the City
Adjustment Costs, and further desire that this amendment shall constitute the amendment for the
final agreed sum contemplated in Section 3.A.(3) of the Agreement;
NOW THEREFORE, in consideration of the premises and of the mutual covenants and
agreements of the parties hereto,to be by them kept and performed as hereafter set forth, TxDOT
and City do agree as follows:
1 SCANNED
• FEBRUARY 25,2020
PRIVILEGED&CONFIDENTIAL
FIRST AMENDMENT TO THE AGREEMENT
1. Definitions
The following definitions shall apply to this amendment and all subsequent amendments.
Capitalized terms not defined herein shall have the definitions given to them in the Agreement.
a. Amendment Effective Date means the date on which this First Amendment is
effective, which is the date on which the First Amendment is executed by both
TxDOT and the City.
b. Final Plans means the plans for the work shown on Exhibit A.
2. Allocation of City Adjustment Costs
The parties agree that the final agreed sum for the City Adjustment Costs is $21,000,000.00. The
City will pay to TxDOT the amount of$19,924,026, which is the $21,000,000.00 less the amount
of$1,075,974.00, which has already been paid by the City to TxDOT, and which will be applied
by TxDOT to the City Adjustment Costs. The parties agree that regardless of the final cost to
relocate and adjust the City Utilities,the cost to the City will not exceed$21,000,000.00.
The City will pay to TxDOT the City Adjustment Costs as follows:(i) $13,282,684.00 will be paid
by no later than December 1,2019, and(ii) $6,641,342.00 will be paid by no later than October 1,
2021.
3. Betterments
The parties agree that as of the Amendment Effective Date, there are no Betterments either
constructed, under construction, or within the scope of the Final Plans. Whether any future
requested relocation or adjustment constitutes a Betterment shall be determined in TxDOT's
reasonable discretion. TxDOT may, in its sole and unfettered discretion, refuse to perform a
Betterment for the reasons stated in the Agreement.
In the event Betterments are performed, TxDOT will separately invoice the City periodically for
the costs of any Betterments, as the work on the Betterments is performed. The City shall pay
such invoices within forty-five(45) days of receipt from TxDOT.
4. Ratification of Agreement
Other than as expressly modified or amended in this First Amendment,the Agreement shall remain
in full force and effect in accordance with its terms. Additionally, the parties ratify and confirm
the Agreement, as such is amended by this First Amendment.
5. Signatory Warranty
Each signatory warrants that the signatory has necessary authority to execute this Agreement on
behalf of the entity represented.
2
FEBRUARY 25,2020
PRIVILEGED&CONFIDENTIAL
THIS AGREEMENT IS EXECUTED by TxDOT and City in duplicate.
TEXAS DEPARTMENT OF CITY OF CORPUS CHRISTI
TRANSPORTATION
By: Valente Olivarez,Jr., P.E. By: Jeffrey H. Edmonds, P.E.
[Printed ame] [Printed Name]
App
,�
By: �'/ � By:
Authorized Signature Duly Authorized Representative Signature
District Engineer Director of Engineering Services
Date: 3/5/20240 Date: 2/2.10 2ve0
Approved as to form:Z'21-1-1`3
ssistant City Attorney
For City Attorney
3
FEBRUARY 25,2020
PRIVILEGED&CONFIDENTIAL
EXHIBIT A
Final Plans
Original Separated Final
Utility Package Package IDs Revised RFC Date Location
GI G1 3/14/2018 Burleson
G3-1 G3-1 3/14/2018 Mestina
G3-2 G3-2 3/14/2018 SH 286 NBFR at Lipan
G3-3 G3-3 3/14/2018 Caldwell to Comanche
G3-4 G3-4 3/14/2018 SH 286
G3-5 G3-5 3/14/2018 Howard
G4 G4 3/14/2018 Breakwater
G5 _ G5 3/14/2018 Nueces Bay Blvd
Gas G6 G6 3/14/2018 Lexington to Noakes
G8 G8 3/14/2018 Artesian
G9 G9 3/14/2018 Winnebago
ii G10 G10-1 3/14/2018 E Port Ave
71 G11 Gil G11.1 10/16/2018 N Port Ave
_ G11 Gil G11.2 10/16/2018 Brewster
Gil Gil G11.3 12/27/2018 Doss St from Leopard to Mestina
St
SIGil G11 G11.4 US 181 at Navigation Blvd
W1 W1 2/27/2018 US 181 Beach Ave to Elm St
W2 W 2-1,2-2 W2-1 12/9/2018 Prop US 181 Avenue F to E
Causeway Blvd
W3 W-3 W-3 4/5/2018 SH 286 SBFR Mestina to
Caldwell St
W4 W-4 W-4 4/5/2018 SH 286 SBFR Mestina St to
Howard St
W5, W6 W-6 W-6 12/9/2018 IH 37 EBFR Van Loan Ave to
Nueces Bay Blvd
Water W8 W-8 W-8 12/9/2018 IH 37 Lexington Ave to Peabody
Ave
W9 W-9 W-9 8/12/2019 IH 37 Sam Rankin to Staples St
W10 W-10 W-10 12/9/2018 IH 37 at Artesian St Crossing
W11 W11 2/27/2018 IH 37 Lexington Ave to Sam
Rankin St
W12 W-12 W-12 12/9/2018 US 181 W Broadway St to E Port
Ave
W15 W-15 W-15 12/9/2018 IH 37 Peabody Ave to Nueces
Bay Blvd
4
FEBRUARY 25,2020
PRIVILEGED&CONFIDENTIAL
WW1, WW2 WW1-1, 1-2 WW3 6/4/2019 Burleson St to Walnut St
WW7.1 WW7 US 181 at W. Broadway to SH
North North 4/5/2018 286 at Mestina
WW7.2 North WW-7 W 1 /27/2018 Wastewater1W Package WW7-
est
WW7.2 R WW-7 WW-7.1E 2/27/2019 Wastewater Package WW7-East
WW8 WW 8 WW g IH 37 Crossing at Nueces Bay
Waste Blvd
Water WW10 WW-10 WW-10 12/9/2018 IH 37 Alameda St to Staples St
WWI 1 WW-11 WW-11 IH 37 Crossing at Artesian St
WW13 WW-13 WW-13 12/9/2018 US 181 E Port Ave to W
Broadway St
4 WW15 WW-15WW-15 IH 37 EBFR Stillman Ave to
* Kennedy Ave
W W 16 WW-16, 18 WW-16
1/18/18 IH 37 EBFR N Port Ave to Doss
0 St
Fl F-1 F1-1 5/10/2019 IH 37 Lipan St
NOTES:
5