HomeMy WebLinkAboutC2020-258 - 7/21/2020 - Approved CITY OF CORPUS CIIRIS'fI 41/ .,.,"^v,, ENGINEERING SERVICES CHANGE ORDER CHANGE ORDER NO: 8-COUNCIL CHANGE ORDER DATE: 6/15;2020 PROJECT: Rodd Field Rd.-Yorktown Blvd.to Saratoga}3:sd.(Bond 2014) PROJECT NUMBER: 015112 CONTRACTOR: Haas Anderson Construction,I.Id, ORIGINAL CONTRACT TIME: 810 CIYs ENGINEER: UA Engineering Make the following additions,modifications or deletions to the work described In the Contract Documents: ADDITIONS Quantity Unit Unit Price Total Master Channel 31 Changes 0-New 8 Master Channel 31 Changes-Culvert Rehab&Replacement I FPP S 1.436,822.00 S 1,436.822.00 HI Gas Line Trench Excavation,Redding.&Backfill 200 LI' S 19.00 $ 3,800.00 H2 Pipe Trench Safety 200 LF S 1.10 $ 220.00 Additions Total: $ 1,440,842.00 DELETIONS Reconciliation E53 Concrete Headwall -1 EA S 18,800.00 S (18,800.00) 054 Concrete Wingwall -2 EA S 10,300.00 S (20,600.00) E56 42"RCP Outfall Penetration Repair -0.25 EA S 3,020.00 S. (755.00) E58 54"RCP Outfall Penetration Repair -0.25 EA S 3,020.00 5 (755.00) Deletions Total: S (40,910.00) Additional Calendar Days rcyucsled 122 NET TOTAL OF THIS CHANGE ORDER: $ 1,399,932.00 Why was this Change necessary: During construction Master Channel 31(.MC31)was inspected by the Engineer of Record,UA, to determine the condition of the structure and what repairs.if any,would be required. It was determined dust the MC3I required numerous repairs,was undersized and near the end of its useful lite. UA recommended that MC3I be removed and enlarged to accommodate future development. The Engineering and Utility Departments have reviewed the recommendation and agree. The compensation agreed upon in this Change Order is full,complete and final payment for all costs the Contractor may incur as a resuh of or relating to this change whether said costs are known, unknown.foreseen or unforseen at this time,including without limitation,any cost for delay,extended overhead,ripple or impact cost,or any other effect on changed or unchanged work as a remit of this Change Order. Original Contract Amount S 15,236,240.05 Total Change Order Contingency Amount(25%) S 3,809,060.01 Remaining Available Contingency Amount(including this CO) S 1,767,946.30 Previously Approved Change Order Amount 5 641,181.71 Proposed Change Order Amount S s. 1,399,932.00 Revised Contract Amount S 17277,353.76 Percent of Total Change Orders(including this CO) 13.40% Original Contract Time for Substantial Completion 810 CD's Notice to Proceed Date 1126+2018 Original Substantial Completion Date 2/132021 Previously Approved Change Order Time 0 CD's Additional Time on This Change Order 122 CD's Revised Contract Time fur Substantial Completion 932 CD's Revised Substantial Completion Date 6/152021 REVIEWED BY: LJA Engineering REQUESTED BY:Haas-Anderson Construction,Ltd. n/a4/4/?° Engineer Date Scott Kelles y Date Project Manager C'fl'OF CORPUS CHRIS'T'I Digitally signed by Brett Van Brett Van Hazel Hazel Date:2020.06.18 14:53:40-05'00' FUND: 4532-043 It/a RECOMMENDED BY: .\CCOUNT: 550910 1i/a Brett Van Hazel Digitally signed by Jeff r>.1?ale :ACTIVITY: E15112-01-4532-EXP n/a Construction Engineer at:m-rNrrmnonds.'c'ih.:r AMOUNT: $1,400,000.00 n/t( Corpus Owlsti.mrtngineenng SeMaes. enall.MketeKaenssan RECOMMENDED BY: Ma:]020.07.16aPArs9 05'00' APPROVED BY: 7 er- Jeff H.Edmonds Date Michael Rodriguez Date Director of Engineering Services Chief of Staff 2020.06.3015:53:23-05'00'0 RECOMMENDED BY: Electronic Approval 6/29/2020 APPROVED AS TO ��/�, Eddie Houlihan,Director Date � FORM:Kent Mcilvar Date Management and Budg J1(�\.41 �'d' AU(thailii4Mty Attorney ATTEST: - 1— a`' lc REBECCA HUERTA .,,,�.-- �Y RC���.- SCAN NED CITY SECRETARY — .C32 I, srr.RFTARV JU