Loading...
HomeMy WebLinkAboutC2020-286 - 7/28/2020 - Approved ENGINEERING SERVICES CHANGE ORDER ,7.5440: 6232020 E11066 CHANGE ORDER NO: 19(COUNCIL) CHANGE ORDER DATE: PROJECT: ONSWTP High Service Bldg.#3 PROJECT NUMBER: CONTRACTOR: PLW Cadagua Partners ORIGINAL CONTRACT TIME: 1065 CD's Total 24,389.59 ENGINEER: LNV,Inc. CITY OF CORPUS CHRISTI Make the following additions,modifications or deletions to the wort:described in the('untract Documents: ADDITIONS Quantity Unit Unit Price Additional Scope RFP.22 Rev.4(062320) Retrofit of Electrical Parts on Pumps&Motors 1 LS $ 24,389.59 $ DAYS $ Additional Days:Scope Change 18 - $ LS DAYS LS DAYS LS DAYS $ IS DAYS S LS - RFP.28 Rev.4(062320) Addition of conduit&conductors for generator per Cummins 1 $ 34,102.63 $ 34,102.63 Additional Days:Scope Change 0 $ - $ RFP.31 Rev.2(062620) HS#3 Punch List Request 1 $ 27,668.98 $ - $ 27,668.98 52,562.32 Additional Days:Scope Change 18 $ - RFP.32 Rev.2(062620) Chemical Injection&Sample Station Improvements 1 $ 52,562.32 S - $ Additional Days:Scope Change 30 - RFP.33 Rev.3(06/23/20) Additional-Chemical Injection&Sample Station Improvements 1 $ 357,011.84 $ - $ 357,011.84 53,868.10 549,603.44 Additional Days:Scope Change 60 - RFP.34 Rev.3(06/1820) Clearwell#1 Repairs DELETIONS none 1 S 53,868.10 S - $ Additional Days:Scope Change 60 DAYS S - Additions Total: S 1 n/a 0 LS $ - S - Deletions Total: S - Additional Calendar Days requested 186 NET TOTAL OF THIS CHANGE ORDER: S 549,603.44 Why was this Change necessary: RFP 22) During construction it was determined that the design required the incorrect conduit bodies.This scope includes the replacement of conduit bodies installed on the pumps to match in-kind throughout. RFP 28) After construction started it was identified that the design for the generator control wiring was incomplete.Additional conduit and conductors were necessary to provide a complete system.This scope includes installation of additional conduit and conductors necessary to complete the generator installation. RFP 31) After construction it was determined that some additional scope items were needed.This scope of work includes repairs to existing pavement,painting the pumps to match the piping system, and modifications to the cage ladder penetration through the ceiling that leads to the mezzanine. RFP 32) After construction it was determined that some additional scope items were needed to keep the plant operating during construction.This scope of work includes installation of two(2) foundations and associated drain lines to accommodate future sample stations and relocating the post injection LAS and chlorine points for Plant 1 treatment train.The relocation of LAS and chlorine injection points were requested to allow operations to divert Plant 1 flow to nearby junction box that feeds to Clearwell 2 which will bypass Clearwell I while providing adequate post injection whilst ensuring optimum water quality. RFP 33) After construction it was determined that some additional scope items were needed to keep the plant operating during construction.This scope of work is related to Cost Proposal No.32 and includes the installation of two(2)sample stations,which includes pumps,analyzers,and all electrical work required to provide a functioning system.The new sample stations will assist the plant operations with maintaining adequate injection ratios and ensuring optimum water quality during CW 1 rehabilitation and after the decommissioning of HS#1. RFP 34) This scope of work accounts for the project delay resulting from the Clearwell 1 rehabilitation work being postponed,allowing for the High Service#2 pumps to be rehabilitated and put back in operation prior to the High Service#1 pumps being decommissioned.By doing this it ensured the plant was running at full pumping capacity throughout construction. The compensation agreed upon in this Change Order is full,complete and final payment for all costs the Contractor may incur as a result of or relating to this change whether said costs are known, unknown,foreseen or unforseen at this time,including without limitation,any cost for delay,extended overhead,ripple or impact cost,or any other effect on changed or unchanged work as a result of this Change Order. • Original Contract Amount S 21,650,000.00 Total Change Order Contingency Amount(25%) $ 5,412,500.00 Remaining Available Contingency Amount(including this CO) S 3,726,092.47 Previously Approved Change Order Amount $ 1,136,804.09 Proposed Change Order Amount S 549,603.44 Revised Contract Amount S 23,336,407.53 Percent of Total Change Orders(including this CO) 7.79% Original Contract Time for Substantial Completion 1065 CD's Notice to Proceed Date 10/3/2016 Original Substantial Completion Date 9/3/2019 Previously Approved Change Order Time 376 CD's Additional Time on This Change Order 186 CD's Revised Contract Time for Substantial Completion 1627 CD's Revised Substantial Completion Date 3/18/2021 SCANNED Page 1 of 2 DocuSign Envelope ID:OB8C2DA7-8A84-497E-971 E-DD9205C89151 CITY OF CORPUS CHRISTI X-{ ENGINEERING SERVICES �' CHANGE ORDER •+ CHANGE ORDER DATE: 623/2020 CHANGE ORDER NO: 19(COUNCIL) : El 1066 PROJECT: ONSWTP High Service Bldg.#3 ORIGINAL CONTRACT PROJECT NUMBER : 1065 CD's CONTRACTOR: PLW Cadagua Partners ENGINEER: LNV,Inc. REVIEWED BY: LNV,Inc. REQUESTED BY: PLW Cadagua Partners u319n.e by: 6/26/2020 I tea -,-Ln2usann-gx-.410 Date motto Lopez taacetti Date EngineerDate President Digitally signed 1 III lt®8crORPUS CHRISTI Brett Van Hazel Hazel Date:2020.06.30 10:24:45 FUND: 4098-062 n/a RECOMMENDED BY: 05'00' ACCOUNT: 550910 n/a Brett Van Hazel Date ACTIVITY: E11066-01-0098-EXP n/a Digitally ed by Jeff AMOUNT: $549,603.44 n/a Construction Engineer , eff Edmond ' /rorp.s 1wiW..-Engi'Cnol CorpusCMiul,ou-Engnaedng / Service, ` 1202001 20200116 09,158 c•US 7-' 7— 2' Oats 2020.011604Q58 06'00 APPROVED BY:?87 II?, RECOMMENDED BY: Jeffrey Edmonds,P.E. Date Michael Rodriguez Date Director of Engineering Services Chief of Staff ,1J�.. ' o, 2020.07.01 10:46:04-05'00 RECOMMENDED BY: Electronic Approval 7/1/2020 APPROVED AS TO /" Date' Eddie Houlihan,Director Date FORM:Kent Mctlyar Management and Budget Assistant City Attorney I ' i - i-, • . . f-4, ATTEST REB Y GA H xf rLiwaa.,:„Tic.....), ARY va.......+�r.) BAR `) • Page 2 of 2