C2021-307 - 10/19/2021 - Approved
Agreement 00 52 23 - 1 Project No. 18010A – Callicoatte Road (Up River to IH37) Rev 7/2020 00 52 23 AGREEMENT This Agreement is between the City of Corpus Christi (Owner) and Reytec Construction Resources, Inc. (Contractor). Owner and Contractor agree as follows: ARTICLE 1 – WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as: Callicoatte Road (Up River to IH-37) Project No. 18010A ARTICLE 2 – DESIGNER AND OWNER’S AUTHORIZED REPRESENTATIVE 2.01 The Project has been designed by: Munoz Engineering, LLC 1608 S. Brownlee Boulevard Corpus Christi, Texas 78404 ttiffin@munozengrg.com 2.02 The Owner’s Authorized Representative for this Project is: Brett Van Hazel, PMP, Asst. Director of Construction Management City of Corpus Christi-Engineering Services 4917 Holly Road, Bldg. #5 Corpus Christi, TX 78411 ARTICLE 3 – CONTRACT TIMES 3.01 Contract Times A. The Work is required to be substantially completed within 180 days after the date when the Contract Times commence to run as provided in the Notice to Proceed and is to be completed and ready for final payment in accordance with Paragraph 17.16 of the General Conditions within 210 days after the date when the Contract Times commence to run. B. Performance of the Work is required as shown in Paragraph 7.02 of the General Conditions. DocuSign Envelope ID: 2E8D7B1D-06D9-4EE9-8D28-5A7317AB6CE0 Agreement 00 52 23 - 2 Project No. 18010A – Callicoatte Road (Up River to IH37) Rev 7/2020 C. Milestones, and the dates for completion of each, are as defined in Section 01 35 00 SPECIAL PROCEDURES. 3.02 Liquidated Damages A. Owner and Contractor recognize that time limits for specified Milestones, Substantial Completion, and completion and readiness for Final Payment as stated in the Contract Documents are of the essence of the Contract. Owner and Contractor recognize that the Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.01 and as adjusted in accordance with Paragraph 11.05 of the General Conditions. Owner and Contractor also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty): 1. Substantial Completion: Contractor shall pay Owner $1,500.00 for each day that expires after the time specified in Paragraph 3.01 for Substantial Completion until the Work is substantially complete. 2. Completion of the Remaining Work: Contractor agrees to pay Owner $800.00 for each day that expires after the time specified in Paragraph 3.01 for completion and readiness for final payment until the Work is completed and ready for final payment in accordance with Paragraph 17.16 of the General Conditions. 3. Liquidated damages for failing to timely attain Substantial Completion and Final Completion are not additive and will not be imposed concurrently. 4. Milestones: Contractor agrees to pay Owner liquidated damages as stipulated in SECTION 01 35 00 SPECIAL PROCEDURES for failure to meet Milestone completions. 5. The Owner will determine whether the Work has been completed within the Contract Times. B. Owner is not required to only assess liquidated damages, and Owner may elect to pursue its actual damages resulting from the failure of Contractor to complete the Work in accordance with the requirements of the Contract Documents. ARTICLE 4 – CONTRACT PRICE 4.01 Owner will pay Contractor for completion of the Work in accordance with the Contract Documents at the unit prices shown in the attached BID FORM. Unit prices have been computed in accordance with Paragraph 15.03 of the General Conditions. Contractor acknowledges that estimated quantities are not guaranteed, and were solely for the purpose of comparing Bids, and final payment for all unit price items will be based on actual quantities, determined as provided in the Contract Documents. Total Base Bid Price $ 1,927,197.50 ARTICLE 5 – PAYMENT PROCEDURES 5.01 Submit Applications for Payment in accordance with Article 17 of the General Conditions. Applications for Payment will be processed by the OAR as provided in the General Conditions. DocuSign Envelope ID: 2E8D7B1D-06D9-4EE9-8D28-5A7317AB6CE0 Agreement 00 52 23 - 3 Project No. 18010A – Callicoatte Road (Up River to IH37) Rev 7/2020 5.02 Progress Payments; Retainage: A. The Owner will make progress payments on or about the 25th day of each month during performance of the Work. Payment is based on Work completed in accordance with the Schedule of Values established as provided in the General Conditions. B. Progress payments equal to the full amount of the total earned value to date for completed Work minus the retainage listed below and properly stored materials will be made prior to Substantial Completion. 1. The standard retainage is 5 percent. C. Payment will be made for the amount determined per Paragraph 5.02.B, less the total of payments previously made and less set-offs determined in accordance with Paragraph 17.01 of the General Conditions. D. At the Owner’s option, retainage may be increased to a higher percentage rate, not to exceed ten percent, if progress on the Project is considered to be unsatisfactory. If retainage in excess of the amount described above is held prior to Substantial Completion, the Owner will place the additional amount in an interest bearing account. Interest will be paid in accordance with Paragraph 6.01. E. At the Owner’s option, Owner may pay Contractor 100 percent of the Work completed, less amounts withheld in accordance with Paragraph 17.01 of the General Conditions and less 200 percent of OAR’s estimate of the value of Work to be completed or corrected to reach Substantial Completion. Owner may, at its sole discretion, elect to hold retainage in the amounts set forth above for progress payments prior to Substantial Completion if Owner has concerns with the ability of the Contractor to complete the remaining Work in accordance with the Contract Documents or within the time frame established by this Agreement. Release or reduction in retainage is contingent upon and consent of surety to the reduction in retainage. 5.03 Owner will pay the remainder of the Contract Price as recommended by OAR in accordance with Paragraph 17.16 of the General Conditions upon Final Completion and acceptance of the Work. ARTICLE 6 – INTEREST ON OVERDUE PAYMENTS AND RETAINAGE 6.01 The Owner is not obligated to pay interest on overdue payments except as required by Texas Government Code Chapter 2251. Invoices must comply with Article 17 of the General Conditions. 6.02 Except as specified in Article 5, the Owner is not obligated to pay interest on moneys not paid except as provided in Texas Government Code Chapter 2252. ARTICLE 7 – CONTRACTOR’S REPRESENTATIONS 7.01 The Contractor makes the following representations: A. The Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. The Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. DocuSign Envelope ID: 2E8D7B1D-06D9-4EE9-8D28-5A7317AB6CE0 Agreement 00 52 23 - 4 Project No. 18010A – Callicoatte Road (Up River to IH37) Rev 7/2020 C. The Contractor is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work. D. The Contractor has carefully studied the following Site-related reports and drawings as identified in the Supplementary Conditions: 1. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; 2. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; 3. Underground Facilities referenced in reports and drawings; 4. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and 5. Technical Data related to each of these reports and drawings. E. The Contractor has considered the: 1. Information known to Contractor; 2. Information commonly known to contractors doing business in the locality of the Site; 3. Information and observations obtained from visits to the Site; and 4. The Contract Documents. F. The Contractor has considered the items identified in Paragraphs 7.01.D and 7.01.E with respect to the effect of such information, observations, and documents on: 1. The cost, progress, and performance of the Work; 2. The means, methods, techniques, sequences, and procedures of construction to be employed by Contractor; and 3. Contractor’s safety precautions and programs. G. Based on the information and observations referred to in the preceding paragraphs, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. H. The Contractor is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. I. The Contractor has correlated the information known to the Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. J. The Contractor has given the OAR written notice of all conflicts, errors, ambiguities, or discrepancies that the Contractor has discovered in the Contract Documents, and the written resolution provided by the OAR is acceptable to the Contractor. K. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. DocuSign Envelope ID: 2E8D7B1D-06D9-4EE9-8D28-5A7317AB6CE0 Agreement 00 52 23 - 5 Project No. 18010A – Callicoatte Road (Up River to IH37) Rev 7/2020 L. Contractor’s entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. M. CONTRACTOR SHALL INDEMNIFY, DEFEND AND HOLD HARMLESS THE OWNER’S INDEMNITEES IN ACCORDANCE WITH PARAGRAPH 7.14 OF THE GENERAL CONDITIONS AND THE SUPPLEMENTARY CONDITIONS. ARTICLE 8 – ACCOUNTING RECORDS 8.01 Accounting Record Availability: The Contractor shall keep such full and detailed accounts of materials incorporated and labor and equipment utilized for the Work consistent with the requirements of Paragraph 15.01 of the General Conditions and as may be necessary for proper financial management under this Agreement. Subject to prior written notice, the Owner shall be afforded reasonable access during normal business hours to all of the Contractor’s records, books, correspondence, instructions, drawings, receipts, vouchers, memoranda, and similar data relating to the Cost of the Work and the Contractor’s fee. The Contractor shall preserve all such documents for a period of 3 years after the final payment by the Owner. ARTICLE 9 – CONTRACT DOCUMENTS 9.01 Contents: A. The Contract Documents consist of the following: 1. Exhibits to this Agreement: a. Contractor’s Bid Form. 2. Specifications, forms, and documents listed in SECTION 00 01 00 TABLE OF CONTENTS. 3. Drawings listed in the Sheet Index. 4. Solicitation documents and Contractor’s response, which are incorporated by reference. 5. Addenda, which are incorporated by reference. 6. Documentation required by the Contract Documents and submitted by Contractor prior to Notice of Award, which is incorporated by reference. B. There are no Contract Documents other than those listed above in this Article. C. The Contract Documents may only be amended, modified, or supplemented as provided in Article 11 of the General Conditions. DocuSign Envelope ID: 2E8D7B1D-06D9-4EE9-8D28-5A7317AB6CE0 Agreement 00 52 23 - 6 Project No. 18010A – Callicoatte Road (Up River to IH37) Rev 7/2020 ARTICLE 10 – CONTRACT DOCUMENT SIGNATURES ATTEST CITY OF CORPUS CHRISTI Rebecca Huerta City Secretary Jeff Edmonds, P.E. Director of Engineering Services __________________________ AUTHORIZED APPROVED AS TO LEGAL FORM: BY COUNCIL ___________________________ Assistant City Attorney ATTEST (IF CORPORATION) CONTRACTOR Reytec Construction Resources, Inc. (Seal Below) By: Note: Attach copy of authorization to sign if person signing for CONTRACTOR is not President, Vice President, Chief Executive Officer, or Chief Financial Officer Title: 1901 Hollister Street Address Houston Texas 77080 City State Zip 346-932-3515 Phone Fax greyes@reytec.net Email END OF SECTION DocuSign Envelope ID: 2E8D7B1D-06D9-4EE9-8D28-5A7317AB6CE0 President 11/15/2021 11/18/2021 11/18/2021 RH/SB Res.032578 10/19/2021 11/18/2021 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 �yUS C� Go H U yea na o n n+e� 1$52 00 52 23 AGREEMENT This Agreement is between the City of Corpus Christi (Owner) and Reytec Construction Resources, Inc. (Contractor). Owner and Contractor agree as follows: ARTICLE 1—WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as: Callicoatte Road (Up River to IH-37) Prosect No. 18010A ARTICLE 2—DESIGNER AND OWNER'S AUTHORIZED REPRESENTATIVE 2.01 The Project has been designed by: Munoz Engineering, LLC 1608 S. Brownlee Boulevard Corpus Christi,Texas 78404 ttiffin@munozengrg.com 2.02 The Owner's Authorized Representative for this Project is: Brett Van Hazel, PMP,Asst. Director of Construction Management City of Corpus Christi-Engineering Services 4917 Holly Road,Holly Road, Bldg.#5#5 Corpus Christi,TX 78411 ARTICLE 3—CONTRACT TIMES 3.01 Contract Times A. The Work is required to be substantially completed within 180 days after the date when the Contract Times commence to run as provided in the Notice to Proceed and is to be completed and ready for final payment in accordance with Paragraph 17.16 of the General Conditions within 210 days after the date when the Contract Times commence to run. B. Performance of the Work is required as shown in Paragraph 7.02 of the General Conditions. Agreement 005223- 1 Project No. 18010A—Callicoatte Road (Up River to IH37) Rev 7/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 C. Milestones, and the dates for completion of each,are as defined in Section 0135 00 SPECIAL PROCEDURES. 3.02 Liquidated Damages A. Owner and Contractor recognize that time limits for specified Milestones, Substantial Completion, and completion and readiness for Final Payment as stated in the Contract Documents are of the essence of the Contract. Owner and Contractor recognize that the Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.01 and as adjusted in accordance with Paragraph 11.05 of the General Conditions. Owner and Contractor also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty): 1. Substantial Completion: Contractor shall pay Owner$1,500.00 for each day that expires after the time specified in Paragraph 3.01 for Substantial Completion until the Work is substantially complete. 2. Completion of the Remaining Work: Contractor agrees to pay Owner$800.00 for each day that expires after the time specified in Paragraph 3.01 for completion and readiness for final payment until the Work is completed and ready for final payment in accordance with Paragraph 17.16 of the General Conditions. 3. Liquidated damages for failing to timely attain Substantial Completion and Final Completion are not additive and will not be imposed concurrently. 4. Milestones: Contractor agrees to pay Owner liquidated damages as stipulated in SECTION 0135 00 SPECIAL PROCEDURES for failure to meet Milestone completions. 5. The Owner will determine whether the Work has been completed within the Contract Times. B. Owner is not required to only assess liquidated damages, and Owner may elect to pursue its actual damages resulting from the failure of Contractor to complete the Work in accordance with the requirements of the Contract Documents. ARTICLE 4—CONTRACT PRICE 4.01 Owner will pay Contractor for completion of the Work in accordance with the Contract Documents at the unit prices shown in the attached BID FORM. Unit prices have been computed in accordance with Paragraph 15.03 of the General Conditions. Contractor acknowledges that estimated quantities are not guaranteed, and were solely for the purpose of comparing Bids, and final payment for all unit price items will be based on actual quantities, determined as provided in the Contract Documents. Total Base Bid Price $ 1,927,197.50 ARTICLE 5—PAYMENT PROCEDURES 5.01 Submit Applications for Payment in accordance with Article 17 of the General Conditions. Applications for Payment will be processed by the OAR as provided in the General Conditions. Agreement 005223- 2 Project No. 18010A—Callicoatte Road (Up River to I1-137) Rev 7/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 5.02 Progress Payments; Retainage: A. The Owner will make progress payments on or about the 25th day of each month during performance of the Work. Payment is based on Work completed in accordance with the Schedule of Values established as provided in the General Conditions. B. Progress payments equal to the full amount of the total earned value to date for completed Work minus the retainage listed below and properly stored materials will be made prior to Substantial Completion. 1. The standard retainage is 5 percent. C. Payment will be made for the amount determined per Paragraph 5.02.13, less the total of payments previously made and less set-offs determined in accordance with Paragraph 17.01 of the General Conditions. D. At the Owner's option, retainage may be increased to a higher percentage rate, not to exceed ten percent, if progress on the Project is considered to be unsatisfactory. If retainage in excess of the amount described above is held prior to Substantial Completion,the Owner will place the additional amount in an interest bearing account. Interest will be paid in accordance with Paragraph 6.01. E. At the Owner's option, Owner may pay Contractor 100 percent of the Work completed, less amounts withheld in accordance with Paragraph 17.01 of the General Conditions and less 200 percent of OAR's estimate of the value of Work to be completed or corrected to reach Substantial Completion. Owner may, at its sole discretion, elect to hold retainage in the amounts set forth above for progress payments prior to Substantial Completion if Owner has concerns with the ability of the Contractor to complete the remaining Work in accordance with the Contract Documents or within the time frame established by this Agreement. Release or reduction in retainage is contingent upon and consent of surety to the reduction in retainage. 5.03 Owner will pay the remainder of the Contract Price as recommended by OAR in accordance with Paragraph 17.16 of the General Conditions upon Final Completion and acceptance of the Work. ARTICLE 6—INTEREST ON OVERDUE PAYMENTS AND RETAINAGE 6.01 The Owner is not obligated to pay interest on overdue payments except as required by Texas Government Code Chapter 2251. Invoices must comply with Article 17 of the General Conditions. 6.02 Except as specified in Article 5, the Owner is not obligated to pay interest on moneys not paid except as provided in Texas Government Code Chapter 2252. ARTICLE 7—CONTRACTOR'S REPRESENTATIONS 7.01 The Contractor makes the following representations: A. The Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. The Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. Agreement 005223-3 Project No. 18010A—Callicoatte Road (Up River to IH37) Rev 7/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 C. The Contractor is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work. D. The Contractor has carefully studied the following Site-related reports and drawings as identified in the Supplementary Conditions: 1. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; 2. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; 3. Underground Facilities referenced in reports and drawings; 4. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and 5. Technical Data related to each of these reports and drawings. E. The Contractor has considered the: 1. Information known to Contractor; 2. Information commonly known to contractors doing business in the locality of the Site; 3. Information and observations obtained from visits to the Site; and 4. The Contract Documents. F. The Contractor has considered the items identified in Paragraphs 7.01.D and 7.01.E with respect to the effect of such information, observations, and documents on: 1. The cost, progress, and performance of the Work; 2. The means, methods, techniques, sequences, and procedures of construction to be employed by Contractor; and 3. Contractor's safety precautions and programs. G. Based on the information and observations referred to in the preceding paragraphs, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. H. The Contractor is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. I. The Contractor has correlated the information known to the Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. J. The Contractor has given the OAR written notice of all conflicts, errors, ambiguities, or discrepancies that the Contractor has discovered in the Contract Documents,and the written resolution provided by the OAR is acceptable to the Contractor. K. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. Agreement 005223-4 Project No. 18010A—Callicoatte Road (Up River to IH37) Rev 7/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 L. Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. M. CONTRACTOR SHALL INDEMNIFY, DEFEND AND HOLD HARMLESS THE OWNER'S INDEMNITEES IN ACCORDANCE WITH PARAGRAPH 7.14 OF THE GENERAL CONDITIONS AND THE SUPPLEMENTARY CONDITIONS. ARTICLE 8—ACCOUNTING RECORDS 8.01 Accounting Record Availability: The Contractor shall keep such full and detailed accounts of materials incorporated and labor and equipment utilized for the Work consistent with the requirements of Paragraph 15.01 of the General Conditions and as may be necessary for proper financial management under this Agreement. Subject to prior written notice,the Owner shall be afforded reasonable access during normal business hours to all of the Contractor's records, books, correspondence, instructions,drawings, receipts,vouchers, memoranda,and similar data relating to the Cost of the Work and the Contractor's fee. The Contractor shall preserve all such documents for a period of 3 years after the final payment by the Owner. ARTICLE 9—CONTRACT DOCUMENTS 9.01 Contents: A. The Contract Documents consist of the following: 1. Exhibits to this Agreement: a. Contractor's Bid Form. 2. Specifications, forms, and documents listed in SECTION 00 0100 TABLE OF CONTENTS. 3. Drawings listed in the Sheet Index. 4. Solicitation documents and Contractor's response,which are incorporated by reference. 5. Addenda, which are incorporated by reference. 6. Documentation required by the Contract Documents and submitted by Contractor prior to Notice of Award,which is incorporated by reference. B. There are no Contract Documents other than those listed above in this Article. C. The Contract Documents may only be amended, modified, or supplemented as provided in Article 11 of the General Conditions. Agreement 005223-5 Project No. 18010A—Callicoatte Road (Up River to I1-137) Rev 7/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 ARTICLE 10—CONTRACT DOCUMENT SIGNATURES ATTEST CITYD��sggVLlS CHRISTI L�� Signed by: qLt/�'' 11/18/2021 C� 11/18/2021 ESEC8FF13CEF4A0_ Rebecca Huerta Jeff Edmonds, P.E. City Secretary Director of Engineering Services Res.032578 AUTHORIZED 10/19/2021 APPROVED AS TO LEGAL FORM: BY COUNCIL E DocuSigned by: f Adlygr 11/18/2021 RH/SB E9.295EGC.IlF�4.F.C. Assistant City Attorney ATTEST(IF CORPORATION) CONTRACTOR Reytec eek,0m �YResources, Inc. (Seal Below) By: 11/15/2021 President Note: Attach copy of authorization to sign if Title: person signing for CONTRACTOR is not President, Vice President, Chief Executive Officer, or Chief 1901 Hollister Street Financial Officer Address Houston Texas 77080 City State Zip 346-932-3515 Phone Fax greyes@reytec.net Email END OF SECTION Agreement 005223-6 Project No. 18010A—Callicoatte Road (Up River to IH37) Rev 7/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 00 30 OIL BID FORM Project Callicoate Road - IH-37 to Upriver Road Name: Project 18010A Number: Owner: ICILy of Corpus Christi OAR: Designer: Munoz -igineering, LLC By its signature below, Bidder accepts all of the terms and conditions of the Bid Acknowledgement,acknowledges receipt of all Addenda to the Bid and agrees, if this Bid is accepted,to enter into a Contract with the Owner and complete the Work in accordance with the Contract Documents for the Bid price. Bidder: Reytec Construction Resources, Inc. (full legal name of Bidder) Signature: y (signature of person with authority to bind the Bidder) Name: Gregg T Renes (printed name of person signing Bid Form) Title. President&CEO (title of person signing Bid Form) Attest: , ��a r ' (signature) f State of Residency: Texas Federal Tx ID No. 76-0516513 Address for Notices: 1901 Hollister Street Houston,TX 7780 Phone: 713-957-4003 Email: grr:yes@reytec.net 0811211 ow loW ..........................� rDAMIR0 MAUN07 I I p% '1 00 X4.6 Q__i 00 Bid Form 00 30 01-Page 1 of 5 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 8/2019 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Report Created On:9/20/21 7:53:29 PM BID TOTALS BASE BID 1 (HMAC) Total GENERAL Not Bidding STREET IMPROVEMENTS Not Bidding STORM WATER IMPROVEMENTS Not Bidding WATER IMPROVEMENTS Not Bidding WATER IMPROVEMENTS- LOOP OF SYSTEM Not Bidding WASTEWATER IMPROVEMENTS Not Bidding GAS IMPROVEMENTS Not Bidding Total Not Bidding BASE BID 2(CONCRETE) Total GENERAL $231,197.00 STREET IMPROVEMENTS $584,350.50 STORM WATER IMPROVEMENTS $285,536.00 WATER IMPROVEMENTS $310,623.50 WATER IMPROVEMENTS- LOOP OF SYSTEM $189,550.00 WASTEWATER IMPROVEMENTS $249,478.00 GAS IMPROVEMENTS $76,462.50 Total $1,927,197.50 GENERAL No. Description Unit Qty Unit Price Ext Price Al MOBILIZATION(5% MAX OF PART A) LS 1 $10,000.00 $10,000.00 A2 BONDS AND INSURANCE AL 1 $35,000.00 $35,000.00 A3 STORM WATER POLLUTION LS 1 $8,500.00 $8,500.00 PREVENTION PLAN A4 REINFORCED FILTER FABRIC FENCE LF 235 $12.00 $2,820.00 A5 INLET/GRATE PROTECTION BARRIER EA 22 $280.00 $6,160.00 A6 REVEGETATION(HYDROMULCH) SF 3920 $1.75 $6,860.00 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Report Created On:9/20/21 7:53:29 PM A7 TRAFFIC CONTROL DESIGN PLAN BY LS 1 $5,000.00 $5,000.00 PROFESSIONAL ENGINEER A8 TRAFFIC CONTROL MOBILIZATION/ LS 1 $3,000.00 $3,000.00 ADJUSTMENTS A9 TRAFFIC CONTROL DEVICES MTH 5 $9,000.00 $45,000.00 A10 TEMPORARY PAVEMENT SY 2633 $29.00 $76,357.00 A11 MESSAGE BOARDS FOR TRAFFIC EA 3 $9,000.00 $27,000.00 CONTROL Al2 ARROW BOARDS FOR TRAFFIC CONTROL EA 1 $3,000.00 $3,000.00 A13 OZONE ACTION DAY EA 5 $500.00 $2,500.00 Subtotal:$231,197.00 STREET IMPROVEMENTS No. Description Unit Qty Unit Price Ext Price B1 MOBILIZATION(5% MAX OF PART B) LS 1 $20,000.00 $20,000.00 B2 SITE CLEARING AND GRUBBING SF 3950 $1.20 $4,740.00 B3 DEMO- EXIST ASPHALT PAVEMENT SF 23700 $0.65 $15,405.00 B4 DEMO- EXIST ASPHALT DRIVEWAY SF 5215 $0.50 $2,607.50 B5 DEMO- EXIST CONCRETE DRIVEWAY SF 800 $0.70 $560.00 B6 DEMO- EXIST CONCRETE SF 30 $3.00 $90.00 B7 DEMO- EXIST OUTFALL EA 1 $1,200.00 $1,200.00 B8 REMOVE-GENERAL SIGN EA 2 $80.00 $160.00 B9 REMOVE-SIGN -SPEED LIMIT 30 EA 1 $80.00 $80.00 B10 REMOVE-SM RD SN SUP&AM EA 1 $80.00 $80.00 B11 REMOVE/RELOCATE- EXISTING EA 13 $160.00 $2,080.00 MAI LBOX B12 REMOVE-CHAINLINK FENCE LF 255 $3.00 $765.00 B13 REMOVE-TREE EA 11 $650.00 $7,150.00 B14 RELOCATE- EXIST PEDESTAL EA 6 $160.00 $960.00 B15 ASPHALT PAVEMENT(REMOVE AND SF 655 $15.00 $9,825.00 REPLACE) B16 RIGID PAVEMENT-CONCRETE SY 3210 $90.00 $288,900.00 PAVEMENT 6 INCHES DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Report Created On:9/20/21 7:53:29 PM B17 RIGID PAVEMENT-CRUSHED SY 3675 $24.00 $88,200.00 LIMESTONE BASE 6 INCHES B18 RIGID PAVEMENT-COMPACTED SY 3675 $5.00 $18,375.00 SUBGRADE 12 INCHES B19 DRIVEWAY-CONCRETE SF 5310 $13.00 $69,030.00 B20 CONCRETE FLUME SF 216 $24.00 $5,184.00 B21 CHAINLINK FENCE LF 85 $33.00 $2,805.00 B22 REFL PAV MRKTY C HEATAPPLIED LF 14 $28.00 $392.00 PREFAB PREFORMED TH ERMOPLATIC (W)24"(SLD)(125MIL)(STOP BAR) B23 REFL PAV MRK TY I(Y)4"(SLD)(090M I L) LF 640 $3.00 $1,920.00 B24 REFL PAV MRK TY I(Y)4"(BRK)(090M I L) LF 160 $3.50 $560.00 B25 REFL PAV MRKR TY II-A-A EA 37 $16.00 $592.00 B26 REFL PAV MRKR TY II-B-B EA 5 $22.00 $110.00 B27 SIGN ASSEMBLY-TYPE 3 OBJECT EA 2 $370.00 $740.00 MARKERS B28 SIGN ASSEMBLY-TWO DIRECTION EA 1 $780.00 $780.00 ARROW(48X24)(CW1-7T) B29 SIGN ASSEMBLY-CROSS ROAD(W2- EA 1 $780.00 $780.00 1)(30X30) B30 SIGN ASSEMBLY-T INTERSECTION EA 1 $780.00 $780.00 (30X30)(W2-4) B31 SIGN ASSEMBLY-STOP(R1-1)WITH EA 1 $1,000.00 $1,000.00 STREET ID PLAQUES B32 SIGN ASSEMBLY-SPEED 30 MPH EA 2 $750.00 $1,500.00 (18X24)(R2-1) B33 ALLOWANCE B1 -STREET LIGHTING AL 1 $10,000.00 $10,000.00 B34 ALLOWANCE B2- UNANTICIPATED AL 1 $27,000.00 $27,000.00 STREET IMPROVEMENTS Subtotal:$584,350.50 STORM WATER IMPROVEMENTS No. Description Unit Qty Unit Price Ext Price C1 MOBILIZATION(5% MAX OF PART C) LS 1 $10,000.00 $10,000.00 C2 REMOVE EXIST GRATE INLET EA 2 $300.00 $600.00 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Report Created On:9/20/21 7:53:29 PM C3 DEMO- EXISTING REINFORCED LF 265 $10.00 $2,650.00 CONCRETE PIPE C4 HIGH-PERFORMANCE POLYPROPYLENE LF 754 $85.00 $64,090.00 (HP)- 18-inch C5 HIGH-PERFORMANCE POLYPROPYLENE LF 67 $115.00 $7,705.00 (HP)-24-inch C6 HIGH-PERFORMANCE POLYPROPYLENE LF 370 $140.00 $51,800.00 (HP)-30-inch C7 REINFORCED CONCRETE PIPE(RCP) LF 420 $100.00 $42,000.00 CLASS III - 18-inch C8 REINFORCED CONCRETE PIPE(RCP) LF 43 $210.00 $9,030.00 CLASS III -30-inch C9 GRATE INLET EA 27 $2,200.00 $59,400.00 C10 SET WITH CROSS HARDWARE EA 3 $1,900.00 $5,700.00 C11 30" PIPE OUTFALL EA 1 $4,000.00 $4,000.00 C12 EXIST 18" RCP TO TIE-INTO PROP EA 1 $750.00 $750.00 OUTFALL C13 CONCRETE RIPRAP SF 40 $40.00 $1,600.00 C14 DITCH GRADING LF 1824 $8.00 $14,592.00 C15 TRENCH SAFETY LF 1619 $1.00 $1,619.00 C16 ALLOWANCE FOR UNANTICIPATED AL 1 $10,000.00 $10,000.00 STORM WATER IMPROVEMENTS Subtotal:$285,536.00 WATER IMPROVEMENTS No. Description Unit Qty Unit Price Ext Price D1 MOBILIZATION(5% MAX OF PART D) LS 1 $15,000.00 $15,000.00 D2 ABANDONED IN PLACE EXIST 2"WATER LF 545 $3.50 $1,907.50 LINE D3 REMOVE EXIST WATERLINE LF 50 $34.00 $1,700.00 D4 GROUT FILL EXIST 8"WATER LINE LF 570 $13.00 $7,410.00 D5 ADJUST 20"WATER LINE LF 435 $205.00 $89,175.00 D6 RELOCATE EXIST WATER METER AND EA 11 $550.00 $6,050.00 BOX DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Report Created On:9/20/21 7:53:29 PM D7 REMOVE EXIST FIRE HYDRANT EA 2 $900.00 $1,800.00 ASSEMBLY D8 2"WATERLINE LF 75 $57.00 $4,275.00 D9 6"WATERLINE LF 51 $120.00 $6,120.00 D10 8"WATERLINE LF 1085 $115.00 $124,775.00 D11 8"45 DEGREE DI BEND EA 1 $800.00 $800.00 D12 8"GATE VALVE WITH BOX AND COVER EA 2 $1,300.00 $2,600.00 D13 1" PE WATER SERVICE CONNECTION EA 8 $1,800.00 $14,400.00 D14 TIE TO EXISTING WATER VAULT EA 1 $1,400.00 $1,400.00 D15 TIE TO EXISTING WATER LINE EA 1 $8,600.00 $8,600.00 D16 TIE TO EXISTING 2"WATER SERVICE EA 1 $1,400.00 $1,400.00 CONNECTION D17 FIRE HYDRANT ASSEMBLY EA 2 $6,000.00 $12,000.00 D18 TRENCH SAFETY LF 1211 $1.00 $1,211.00 D19 ALLOWANCE FOR UNANTICIPATED AL 1 $10,000.00 $10,000.00 WATER IMPROVEMENTS Subtotal:$310,623.50 WATER IMPROVEMENTS-LOOP OF SYSTEM No. Description Unit Qty Unit Price Ext Price E1 MOBILIZATION(5% MAX OF PART E) LS 1 $5,000.00 $5,000.00 E2 8"WATERLINE LF 1200 $87.00 $104,400.00 E3 8"GATE VALVE WITH BOX AND COVER EA 3 $1,900.00 $5,700.00 E4 8"45 DEGREE DI BEND EA 2 $800.00 $1,600.00 E5 8"90 DEGREE DI BEND EA 1 $850.00 $850.00 E6 16"STEEL CASING LF 100 $130.00 $13,000.00 E7 BORE AND INSTALL STEEL CASING LF 100 $280.00 $28,000.00 E8 TIE TO EXIST.WATER LINE EA 1 $5,000.00 $5,000.00 E9 FIRE HYDRANT ASSEMBLY(TYPE 1) EA 3 $6,600.00 $19,800.00 E10 TRENCH SAFETY LF 1200 $1.00 $1,200.00 E11 ALLOWANCE FOR UNANTICIPATED AL 1 $5,000.00 $5,000.00 WATER IMPROVEMENTS DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Report Created On:9/20/21 7:53:29 PM Subtotal:$189,550.00 WASTEWATER IMPROVEMENTS No. Description Unit Qty Unit Price Ext Price F1 MOBILIZATION(5% MAX OF PART F) LS 1 $10,000.00 $10,000.00 F2 GROUT FILL EXIST WASTEWATER EA 2 $1,800.00 $3,600.00 MANHOLE F3 GROUT FILL EXIST WASTEWATER LINE LF 625 $22.00 $13,750.00 F4 WASTEWATER MANHOLE EA 4 $10,000.00 $40,000.00 F5 8" PVC WASTEWATER LINE LF 942 $158.00 $148,836.00 F6 WASTEWATER SERVICE CONNECTION EA 11 $2,100.00 $23,100.00 F7 PAVEMENT REPAIR SF 110 $15.00 $1,650.00 F8 8" LINE TIE-INTO WASTEWATER EA 2 $1,300.00 $2,600.00 MANHOLE F9 TRENCH SAFETY LF 942 $1.00 $942.00 F10 ALLOWANCE FOR UNANTICIPATED AL 1 $5,000.00 $5,000.00 WASTEWATER IMPROVEMENTS Subtotal:$249,478.00 GAS IMPROVEMENTS No. Description Unit Qty Unit Price Ext Price G1 MOBILIZATION(5% MAX OF PART G) LS 1 $2,000.00 $2,000.00 G2 RELOCATE GAS METER EA 4 $1,100.00 $4,400.00 G3 ADJUST- LINE(EXCAVATION, BEDDING, LF 1125 $60.00 $67,500.00 BACKFILL,TESTING, INCIDENTALS) G4 TRENCH SAFETY LF 1125 $0.50 $562.50 G5 ALLOWANCE FOR UNANTICIPATED GAS AL 1 $2,000.00 $2,000.00 IMPROVEMENTS Subtotal: $76,462.50 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 CONTRACT DOCUMENTS FOR CONSTRUCTION OF CALLICOATTE ROAD IMPROVEMENTS INTERSTATE 37 ACCESS ROAD TO UP RIVER ROAD [ Bond 2018] Project# 18010A US C 0 1 812 MUNOZ ENGINEERING, LLC M E 1608 S. Brownlee Boulevard Corpus Christi, Texas 78404 MUNOZ ENGINEERING Office: (361) 946-4848 TBPE Firm No. F-12240 � � �� a 04/01/2021 %. . Y R''AMIRO \/IL)NCZ III 100: 46 Record Drawing Number: STR 976 sA�1- CONFORMED/FINAL CONSTRUCTION DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 00 01 00 TABLE OF CONTENTS Division/ Title Section Division 00 Contracting Requirements 00 52 23 Agreement (Rev8-2019) 00 72 00 General Conditions (Rev 12-2020) 00 73 00 Supplementary Conditions (Rev2-2020) Division 01 General Requirements 01 11 00 Summary of Work(Rev 10-2018) 01 23 10 Alternates and Allowances(Rev5-2020) 01 29 01 Measurement and Basis for Payment (Rev5-2020) 01 3301 Submittal Register(Rev 10-2018) 01 3500 Special Procedures (Rev10-2018) 01 5000 Temporary Facilities and Controls (Rev8-2019) 01 5700 Temporary Controls (Rev8-2019) Part S Standard Specifications 021020 Site Clearing & Stripping 021040 Site Grading 021080 Removing Abandoned Structures 022020 Excavation & Backfill for Utilities 022021 Control of Ground Water 022022 Trench Safety for Excavations 022040 Street Excavation 022060 Channel Excavation 022080 Embankment 022100 Select Material 022420 Silt Fence 025202 Scarifying and Reshaping Base Course 025205 Pavement Repair, Curb, Gutter, Sidewalk & Driveway Replacement 025210 Lime Stabilization 025223 Crushed Limestone Flexible Base Table of Contents 000100- 1 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Division/ Title Section 025404 Asphalts, Oils, & Emulsions 025412 Prime Coat 025424 Hot Mix Asphalt Concrete Pavement 025608 Inlets 025610 Concrete Curb & Gutter 025612 Concrete Sidewalks & Driveways 025620 Portland Cement Concrete Pavement 025807 Pavement Markings (Paint and Thermoplastic) 025813 Preformed Thermoplastic Striping, Words & Emblems 025816 Raised Pavement Markers 025818 Reference Specification - TxDOT DMS-4200 Pavement Markers TxDOT (Reflectorized) 025828 Reference Specification - TxDOT DMS-6130 Bituminous Adhesive TxDOT For Pavement Marker 027202 Manholes 027203 Vacuum Testing of Wastewater Manhole and Structures 027402 Reinforced Concrete Pipe Culverts 027404 Concrete Box Culverts 028020 Seeding 028040 Sodding 028300 Fence Relocation 030020 Portland Cement Concrete 032020 Reinforcing Steel 038000 Concrete Structures 055420 Frames, Grates, Rings, & Covers Part T Technical Specifications T-TxDOT 204 Sprinkling T-TxDOT 210 Rolling T-TxDOT 216 Proof Rolling T-TxDOT 502 Barricades, Signs, and Traffic Pipe and Box T-TxDOT 508 Constructing Detours T-TxDOT 510 One-way Traffic Control T-TxDOT 512 Portable Traffic Barricade Table of Contents 000100- 2 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Division/ Title Section T-TxDOT 636 Signs T-TxDOT 644 Small Roadside Sign Assemblies T-TxDOT 662 Work Zone Pavement Markings T-TxDOT 666 Retro-reflectorized Pavement Markings T-TxDOT 668 Prefabricated Pavement Markings T-TxDOT 672 Raised Pavement Markers T-TxDOT 677 Eliminating Existing Pavement Markings and Markers T-TxDOT 678 Pavement Surface Preparation for Markings Appendix Title Geotechnical Report—18010A CALLICOATTE ROAD—IH 37 TO UP RIVER ROAD, 1 CORPUS CHRISTI,TEXAS—TOLUNAY-WONG ENGINEERS, INC. AUGUST 29, 2019 PROJECT NO. 19.53.041/ REPORT NO. 23371 END OF SECTION Table of Contents 000100-3 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 ,us c� �Q 0 � U y�atiaoRp��� 1852 00 52 23 AGREEMENT This Agreement is between the City of Corpus Christi (Owner) and (Contractor). Owner and Contractor agree as follows: ARTICLE 1—WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as: CALLICOATTE ROAD IMPROVEMENTS — INTERSTATE 37 ACCESS ROAD TO UP RIVER ROAD (BOND 2018) Protect Number 18010A ARTICLE 2—DESIGNER AND OWNER'S AUTHORIZED REPRESENTATIVE 2.01 The Project has been designed by: MUNOZ ENGINEERING, LLC 1608 S. BROWNLEE BOULEVARD CORPUS CHRISTI,TEXAS 78404 ttiffinC@munozenere.com 2.02 The Owner's Authorized Representative for this Project is: Name of Owner's Authorized Representative Office Address City, State,Zip Code Email ARTICLE 3—CONTRACT TIMES 3.01 Contract Times A. The Work is required to be substantially completed within 180 days after the date when the Contract Times commence to run as provided in the Notice to Proceed and is to be completed and ready for final payment in accordance with Paragraph 17.16 of the General Conditions within 210 days after the date when the Contract Times commence to run. B. Performance of the Work is required as shown in Paragraph 7.02 of the General Conditions. Agreement 005223- 1 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 7/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 C. Milestones, and the dates for completion of each,are as defined in Section 0135 00 SPECIAL PROCEDURES. 3.02 Liquidated Damages A. Owner and Contractor recognize that time limits for specified Milestones, Substantial Completion, and completion and readiness for Final Payment as stated in the Contract Documents are of the essence of the Contract. Owner and Contractor recognize that the Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.01 and as adjusted in accordance with Paragraph 11.05 of the General Conditions. Owner and Contractor also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay (but not as a penalty): 1. Substantial Completion: Contractor shall pay Owner$1,500.00 for each day that expires after the time specified in Paragraph 3.01 for Substantial Completion until the Work is substantially complete. 2. Completion of the Remaining Work: Contractor agrees to pay Owner$800.00 for each day that expires after the time specified in Paragraph 3.01 for completion and readiness for final payment until the Work is completed and ready for final payment in accordance with Paragraph 17.16 of the General Conditions. 3. Liquidated damages for failing to timely attain Substantial Completion and Final Completion are not additive and will not be imposed concurrently. 4. Milestones: Contractor agrees to pay Owner liquidated damages as stipulated in SECTION 0135 00 SPECIAL PROCEDURES for failure to meet Milestone completions. 5. The Owner will determine whether the Work has been completed within the Contract Times. B. Owner is not required to only assess liquidated damages, and Owner may elect to pursue its actual damages resulting from the failure of Contractor to complete the Work in accordance with the requirements of the Contract Documents. ARTICLE 4—CONTRACT PRICE 4.01 Owner will pay Contractor for completion of the Work in accordance with the Contract Documents at the unit prices shown in the attached BID FORM. Unit prices have been computed in accordance with Paragraph 15.03 of the General Conditions. Contractor acknowledges that estimated quantities are not guaranteed, and were solely for the purpose of comparing Bids, and final payment for all unit price items will be based on actual quantities, determined as provided in the Contract Documents. Total Base Bid Price $ ARTICLE 5—PAYMENT PROCEDURES 5.01 Submit Applications for Payment in accordance with Article 17 of the General Conditions. Applications for Payment will be processed by the OAR as provided in the General Conditions. Agreement 005223- 2 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 7/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 5.02 Progress Payments; Retainage: A. The Owner will make progress payments on or about the 25th day of each month during performance of the Work. Payment is based on Work completed in accordance with the Schedule of Values established as provided in the General Conditions. B. Progress payments equal to the full amount of the total earned value to date for completed Work minus the retainage listed below and properly stored materials will be made prior to Substantial Completion. 1. The standard retainage is 5 percent. C. Payment will be made for the amount determined per Paragraph 5.02.13, less the total of payments previously made and less set-offs determined in accordance with Paragraph 17.01 of the General Conditions. D. At the Owner's option, retainage may be increased to a higher percentage rate, not to exceed ten percent, if progress on the Project is considered to be unsatisfactory. If retainage in excess of the amount described above is held prior to Substantial Completion,the Owner will place the additional amount in an interest bearing account. Interest will be paid in accordance with Paragraph 6.01. E. At the Owner's option, Owner may pay Contractor 100 percent of the Work completed, less amounts withheld in accordance with Paragraph 17.01 of the General Conditions and less 200 percent of OAR's estimate of the value of Work to be completed or corrected to reach Substantial Completion. Owner may, at its sole discretion, elect to hold retainage in the amounts set forth above for progress payments prior to Substantial Completion if Owner has concerns with the ability of the Contractor to complete the remaining Work in accordance with the Contract Documents or within the time frame established by this Agreement. Release or reduction in retainage is contingent upon and consent of surety to the reduction in retainage. 5.03 Owner will pay the remainder of the Contract Price as recommended by OAR in accordance with Paragraph 17.16 of the General Conditions upon Final Completion and acceptance of the Work. ARTICLE 6—INTEREST ON OVERDUE PAYMENTS AND RETAINAGE 6.01 The Owner is not obligated to pay interest on overdue payments except as required by Texas Government Code Chapter 2251. Invoices must comply with Article 17 of the General Conditions. 6.02 Except as specified in Article 5, the Owner is not obligated to pay interest on moneys not paid except as provided in Texas Government Code Chapter 2252. ARTICLE 7—CONTRACTOR'S REPRESENTATIONS 7.01 The Contractor makes the following representations: A. The Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. The Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. Agreement 005223-3 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 7/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 C. The Contractor is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work. D. The Contractor has carefully studied the following Site-related reports and drawings as identified in the Supplementary Conditions: 1. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; 2. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; 3. Underground Facilities referenced in reports and drawings; 4. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and 5. Technical Data related to each of these reports and drawings. E. The Contractor has considered the: 1. Information known to Contractor; 2. Information commonly known to contractors doing business in the locality of the Site; 3. Information and observations obtained from visits to the Site; and 4. The Contract Documents. F. The Contractor has considered the items identified in Paragraphs 7.01.D and 7.01.E with respect to the effect of such information, observations, and documents on: 1. The cost, progress, and performance of the Work; 2. The means, methods, techniques, sequences, and procedures of construction to be employed by Contractor; and 3. Contractor's safety precautions and programs. G. Based on the information and observations referred to in the preceding paragraphs, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. H. The Contractor is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. I. The Contractor has correlated the information known to the Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. J. The Contractor has given the OAR written notice of all conflicts, errors, ambiguities, or discrepancies that the Contractor has discovered in the Contract Documents,and the written resolution provided by the OAR is acceptable to the Contractor. K. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. Agreement 005223-4 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 7/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 L. Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. M. CONTRACTOR SHALL INDEMNIFY, DEFEND AND HOLD HARMLESS THE OWNER'S INDEMNITEES IN ACCORDANCE WITH PARAGRAPH 7.14 OF THE GENERAL CONDITIONS AND THE SUPPLEMENTARY CONDITIONS. ARTICLE 8—ACCOUNTING RECORDS 8.01 Accounting Record Availability: The Contractor shall keep such full and detailed accounts of materials incorporated and labor and equipment utilized for the Work consistent with the requirements of Paragraph 15.01 of the General Conditions and as may be necessary for proper financial management under this Agreement. Subject to prior written notice,the Owner shall be afforded reasonable access during normal business hours to all of the Contractor's records, books, correspondence, instructions,drawings, receipts,vouchers, memoranda,and similar data relating to the Cost of the Work and the Contractor's fee. The Contractor shall preserve all such documents for a period of 3 years after the final payment by the Owner. ARTICLE 9—CONTRACT DOCUMENTS 9.01 Contents: A. The Contract Documents consist of the following: 1. Exhibits to this Agreement: a. Contractor's Bid Form. 2. Specifications, forms, and documents listed in SECTION 00 0100 TABLE OF CONTENTS. 3. Drawings listed in the Sheet Index. 4. Solicitation documents and Contractor's response,which are incorporated by reference. 5. Addenda, which are incorporated by reference. 6. Documentation required by the Contract Documents and submitted by Contractor prior to Notice of Award,which is incorporated by reference. B. There are no Contract Documents other than those listed above in this Article. C. The Contract Documents may only be amended, modified, or supplemented as provided in Article 11 of the General Conditions. ARTICLE 10—CONTRACT DOCUMENT SIGNATURES ATTEST CITY OF CORPUS CHRISTI Rebecca Huerta Michael Rodriguez City Secretary Chief of Staff Agreement 005223-5 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 7/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 AUTHORIZED APPROVED AS TO LEGAL FORM: BY COUNCIL Assistant City Attorney ATTEST(IF CORPORATION) CONTRACTOR (Seal Below) By: Note: Attach copy of authorization to sign if Title: person signing for CONTRACTOR is not President, Vice President, Chief Executive Officer, or Chief Financial Officer Address City State Zip Phone Fax EMail END OF SECTION Agreement 005223-6 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 7/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 00 72 00 GENERAL CONDITIONS Table of Contents Page Article 1—Definitions and Terminology.....................................................................................................10 1.01 Defined Terms.............................................................................................................................10 1.02 Terminology................................................................................................................................15 Article 2—Preliminary Matters...................................................................................................................16 2.01 Delivery of Bonds and Evidence of Insurance.............................................................................16 2.02 Copies of Documents..................................................................................................................16 2.03 Project Management System......................................................................................................16 2.04 Before Starting Construction ......................................................................................................17 2.05 Preconstruction Conference; Designation of Authorized Representatives................................17 Article 3—Contract Documents: Intent, Requirements, Reuse.................................................................17 3.01 Intent...........................................................................................................................................17 3.02 Reference Standards...................................................................................................................18 3.03 Reporting and Resolving Discrepancies......................................................................................19 3.04 Interpretation of the Contract Documents.................................................................................20 3.05 Reuse of Documents...................................................................................................................20 Article 4—Commencement and Progress of the Work..............................................................................20 4.01 Commencement of Contract Times; Notice to Proceed.............................................................20 4.02 Starting the Work........................................................................................................................20 4.03 Progress Schedule.......................................................................................................................21 4.04 Delays in Contractor's Progress..................................................................................................21 Article 5—Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions...................................................................................................................................................22 5.01 Availability of Lands ....................................................................................................................22 5.02 Use of Site and Other Areas........................................................................................................22 5.03 Subsurface and Physical Conditions............................................................................................23 5.04 Differing Subsurface or Physical Conditions...............................................................................24 5.05 Underground Facilities................................................................................................................25 5.06 Hazardous Environmental Conditions at Site.............................................................................26 Article 6—Bonds and Insurance .................................................................................................................28 6.01 Performance, Payment, and Other Bonds..................................................................................28 General Conditions 007200- 1 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 6.02 Licensed Sureties ........................................................................................................................29 6.03 Required Minimum Insurance Coverage....................................................................................29 6.04 General Insurance Provisions......................................................................................................29 6.05 Contractor's Insurance................................................................................................................30 6.06 Property Insurance......................................................................................................................33 6.07 Waiver of Rights..........................................................................................................................34 6.08 Owner's Insurance for Project....................................................................................................34 6.09 Acceptable Evidence of Insurance..............................................................................................35 6.10 Certificate of Insurance...............................................................................................................35 6.11 Insurance Policies........................................................................................................................35 6.12 Continuing Evidence of Coverage...............................................................................................35 6.13 Notices Regarding Insurance ......................................................................................................35 6.14 Texas Workers' Compensation Insurance Required Notice .......................................................36 Article 7-Contractor's Responsibilities.....................................................................................................38 7.01 Supervision and Superintendence..............................................................................................38 7.02 Labor; Working Hours.................................................................................................................38 7.03 Services, Materials, and Equipment ...........................................................................................39 7.04 Concerning Subcontractors, Suppliers, and Others....................................................................39 7.05 Patent Fees and Royalties...........................................................................................................40 7.06 Permits........................................................................................................................................41 7.07 Taxes ...........................................................................................................................................41 7.08 Laws and Regulations..................................................................................................................41 7.09 Safety and Protection .................................................................................................................42 7.10 Safety Representative.................................................................................................................43 7.11 Hazard Communication Programs..............................................................................................43 7.12 Emergencies................................................................................................................................43 7.13 Contractor's General Warranty and Guarantee .........................................................................43 7.14 INDEMNIFICATION......................................................................................................................44 7.15 Delegation of Professional Design Services................................................................................45 Article 8-Other Work at the Site...............................................................................................................46 8.01 Other Work.................................................................................................................................46 8.02 Coordination ...............................................................................................................................47 8.03 Legal Relationships......................................................................................................................47 General Conditions 007200- 2 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Article 9—Owner's and OPT's Responsibilities...........................................................................................48 9.01 Communications to Contractor ..................................................................................................48 9.02 Replacement of Owner's Project Team Members......................................................................48 9.03 Furnish Data................................................................................................................................48 9.04 Pay When Due.............................................................................................................................48 9.05 Lands and Easements; Reports and Tests...................................................................................48 9.06 Insurance.....................................................................................................................................48 9.07 Modifications..............................................................................................................................48 9.08 Inspections,Tests, and Approvals...............................................................................................48 9.09 Limitations on OPT's Responsibilities .........................................................................................48 9.10 Undisclosed Hazardous Environmental Condition......................................................................49 9.11 Compliance with Safety Program................................................................................................49 Article 10—OAR's and Designer's Status During Construction ..................................................................49 10.01 Owner's Representative..........................................................................................................49 10.02 Visits to Site.............................................................................................................................49 10.03 Resident Project Representatives...........................................................................................49 10.04 Rejecting Defective Work........................................................................................................49 10.05 Shop Drawings, Modifications and Payments.........................................................................50 10.06 Decisions on Requirements of Contract Documents and Acceptability of Work...................50 10.07 Limitations on OAR's and Designer's Authority and Responsibilities.....................................50 Article 11—Amending the Contract Documents; Changes in the Work ....................................................50 11.01 Amending and Supplementing the Contract Documents.......................................................50 11.02 Owner-Authorized Changes in the Work................................................................................51 11.03 Unauthorized Changes in the Work........................................................................................51 11.04 Change of Contract Price ........................................................................................................52 11.05 Change of Contract Times.......................................................................................................52 11.06 Change Proposals....................................................................................................................52 11.07 Execution of Change Orders ...................................................................................................53 11.08 Notice to Surety......................................................................................................................54 Article 12—Change Management ..............................................................................................................54 12.01 Requests for Change Proposal................................................................................................54 12.02 Change Proposals....................................................................................................................54 12.03 Designer Will Evaluate Request for Modification...................................................................55 General Conditions 007200- 3 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 12.04 Substitutions...........................................................................................................................55 Article13—Claims.......................................................................................................................................56 13.01 Claims......................................................................................................................................56 13.02 Claims Process.........................................................................................................................57 Article 14—Prevailing Wage Rate Requirements.......................................................................................58 14.01 Payment of Prevailing Wage Rates.........................................................................................58 14.02 Records....................................................................................................................................58 14.03 Liability; Penalty; Criminal Offense.........................................................................................59 14.04 Prevailing Wage Rates.............................................................................................................59 Article 15—Cost of the Work; Allowances; Unit Price Work......................................................................59 15.01 Cost of the Work.....................................................................................................................59 15.02 Allowances..............................................................................................................................63 15.03 Unit Price Work.......................................................................................................................63 15.04 Contingencies..........................................................................................................................64 Article 16—Tests and Inspections; Correction, Removal, or Acceptance of Defective Work....................65 16.01 Access to Work........................................................................................................................65 16.02 Tests, Inspections and Approvals............................................................................................65 16.03 Defective Work .......................................................................................................................65 16.04 Acceptance of Defective Work................................................................................................66 16.05 Uncovering Work....................................................................................................................66 16.06 Owner May Stop the Work.....................................................................................................67 16.07 Owner May Correct Defective Work.......................................................................................67 Article 17—Payments to Contractor; Set-Offs; Completion; Correction Period........................................67 17.01 Progress Payments..................................................................................................................67 17.02 Application for Payment.........................................................................................................69 17.03 Schedule of Values..................................................................................................................71 17.04 Schedule of Anticipated Payments and Earned Value............................................................72 17.05 Basis for Payments..................................................................................................................73 17.06 Payment for Stored Materials and Equipment.......................................................................73 17.07 Retainage and Set-Offs ...........................................................................................................74 17.08 Procedures for Submitting an Application for Payment.........................................................74 17.09 Responsibility of Owner's Authorized Representative...........................................................75 17.10 Contractor's Warranty of Title................................................................................................76 General Conditions 007200-4 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 17.11 Substantial Completion...........................................................................................................76 17.12 Partial Utilization.....................................................................................................................77 17.13 Final Inspection.......................................................................................................................77 17.14 Final Application for Payment.................................................................................................77 17.15 Final Payment..........................................................................................................................78 17.16 Waiver of Claims.....................................................................................................................78 17.17 Correction Period....................................................................................................................78 Article 18-Suspension of Work and Termination.....................................................................................79 18.01 Owner May Suspend Work.....................................................................................................79 18.02 Owner May Terminate for Cause............................................................................................79 18.03 Owner May Terminate For Convenience................................................................................80 Article 19-Project Management...............................................................................................................81 19.01 Work Included.........................................................................................................................81 19.02 Quality Assurance ...................................................................................................................81 19.03 Document Submittal...............................................................................................................81 19.04 Required Permits ....................................................................................................................81 19.05 Safety Requirements...............................................................................................................82 19.06 Access to the Site....................................................................................................................82 19.07 Contractor's Use of Site..........................................................................................................82 19.08 Protection of Existing Structures and Utilities........................................................................83 19.09 Pre-Construction Exploratory Excavations..............................................................................83 19.10 Disruption of Services/Continued Operations........................................................................84 19.11 Field Measurements ...............................................................................................................84 19.12 Reference Data and Control Points.........................................................................................84 19.13 Delivery and Storage...............................................................................................................85 19.14 Cleaning During Construction.................................................................................................86 19.15 Maintenance of Roads, Driveways, and Access......................................................................86 19.16 Area Access and Traffic Control..............................................................................................87 19.17 Overhead Electrical Wires.......................................................................................................87 19.18 Blasting....................................................................................................................................87 19.19 Archeological Requirements...................................................................................................87 19.20 Endangered Species Resources...............................................................................................88 19.21 Cooperation with Public Agencies..........................................................................................88 General Conditions 007200-5 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Article 20—Project Coordination................................................................................................................88 20.01 Work Included.........................................................................................................................88 20.02 Document Submittal...............................................................................................................88 20.03 Communication During Project...............................................................................................89 20.04 Project Meetings.....................................................................................................................89 20.05 Requests for Information........................................................................................................91 20.06 Decision and Action Item Log..................................................................................................91 20.07 Notification By Contractor......................................................................................................92 20.08 Record Documents..................................................................................................................92 Article 21—Quality Management...............................................................................................................94 21.01 Contractor's Responsibilities ..................................................................................................94 21.02 Quality Management Activities by OPT..................................................................................95 21.03 Contractor's Use of OPT's Test Reports..................................................................................96 21.04 Documentation.......................................................................................................................96 21.05 Standards ................................................................................................................................97 21.06 Delivery and Storage...............................................................................................................97 21.07 Verification Testing for Corrected Defects..............................................................................97 21.08 Test Reports............................................................................................................................97 21.09 Defective Work.......................................................................................................................98 21.10 Limitation of Authority of Testing Laboratory........................................................................98 21.11 Quality Control Plan................................................................................................................98 21.12 Implement Contractor's Quality Control Plan ......................................................................100 Article 22—Final Resolution of Disputes..................................................................................................101 22.01 Senior Level Negotiations .....................................................................................................101 22.02 Mediation..............................................................................................................................101 Article 23—Minority/MBE/DBE Participation Policy................................................................................102 23.01 Policy.....................................................................................................................................102 23.02 Definitions.............................................................................................................................102 23.03 Goals......................................................................................................................................103 23.04 Compliance............................................................................................................................104 Article 24—Document Management........................................................................................................104 24.01 Work Included.......................................................................................................................104 24.02 Quality Assurance .................................................................................................................104 General Conditions 007200-6 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 24.03 Contractor's Responsibilities ................................................................................................104 24.04 Document Submittal.............................................................................................................105 24.05 Document Numbering ..........................................................................................................105 24.06 Document Requirements......................................................................................................106 Article25—Shop Drawings.......................................................................................................................107 25.01 Work Included.......................................................................................................................107 25.02 Quality Assurance .................................................................................................................107 25.03 Contractor's Responsibilities ................................................................................................107 25.04 Shop Drawing Requirements ................................................................................................109 25.05 Special Certifications and Reports........................................................................................109 25.06 Warranties and Guarantees..................................................................................................110 25.07 Shop Drawing Submittal Procedures....................................................................................110 25.08 Sample and Mockup Submittal Procedures..........................................................................112 25.09 Equal Non Specified Products...............................................................................................113 25.10 Requests for Deviation..........................................................................................................113 25.11 Designer Responsibilities ......................................................................................................114 25.12 Resubmission Requirements.................................................................................................116 Article26—Record Data ...........................................................................................................................117 26.01 Work Included.......................................................................................................................117 26.02 Quality Assurance .................................................................................................................117 26.03 Contractor's Responsibilities ................................................................................................117 26.04 Record Data Requirements...................................................................................................118 26.05 Special Certifications and Reports........................................................................................118 26.06 Warranties and Guarantees..................................................................................................119 26.07 Record Data Submittal Procedures.......................................................................................119 26.08 Designer's Responsibilities....................................................................................................120 Article 27—Construction Progress Schedule............................................................................................121 27.01 Requirements........................................................................................................................121 27.02 Document Submittal.............................................................................................................121 27.03 Schedule Requirements........................................................................................................121 27.04 Schedule Revisions................................................................................................................123 27.05 Float Time..............................................................................................................................123 Article 28—Video and Photographic documentation ..............................................................................124 General Conditions 007200-7 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 28.01 Work Included.......................................................................................................................124 28.02 Quality Assurance .................................................................................................................124 28.03 Document Submittal.............................................................................................................124 28.04 Photographs..........................................................................................................................125 28.05 Video Recording....................................................................................................................125 Article 29-Execution and Closeout.........................................................................................................125 29.01 Substantial Completion.........................................................................................................125 29.02 Final Inspections....................................................................................................................126 29.03 Reinspection Fees .................................................................................................................126 29.04 Closeout Documents Submittal ............................................................................................127 29.05 Transfer of Utilities ...............................................................................................................127 29.06 Warranties, Bonds and Service Agreements.........................................................................127 Article30-Miscellaneous........................................................................................................................128 30.01 Computation of Times...........................................................................................................128 30.02 Owner's Right to Audit Contractor's Records.......................................................................128 30.03 Independent Contractor.......................................................................................................129 30.04 Cumulative Remedies ...........................................................................................................129 30.05 Limitation of Damages..........................................................................................................129 30.06 No Waiver .............................................................................................................................129 30.07 Severability............................................................................................................................129 30.08 Survival of Obligations ..........................................................................................................129 30.09 No Third Party Beneficiaries .................................................................................................130 30.10 Assignment of Contract.........................................................................................................130 30.11 No Waiver of Sovereign Immunity........................................................................................130 30.12 Controlling Law.....................................................................................................................130 30.13 Conditions Precedent to Right to Sue...................................................................................130 30.14 Waiver of Trial by Jury...........................................................................................................130 30.15 Attorney Fees........................................................................................................................130 30.16 Compliance with Laws...........................................................................................................130 30.17 Enforcement..........................................................................................................................131 30.18 Subject to Appropriation.......................................................................................................131 30.19 Contract Sum.........................................................................................................................131 30.20 Contractor's Guarantee as Additional Remedy....................................................................131 General Conditions 007200-8 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 30.21 Notices. .................................................................................................................................131 General Conditions 007200-9 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 ARTICLE 1—DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Terms with initial capital letters, including the term's singular and plural forms, have the meanings indicated in this paragraph wherever used in the Bidding Requirements or Contract Documents. In addition to the terms specifically defined, terms with initial capital letters in the Contract Documents may include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda - Documents issued prior to the receipt of Bids which clarify or modify the Bidding Requirements or the proposed Contract Documents. 2. Agreement - The document executed between Owner and Contractor covering the Work. 3. Alternative Dispute Resolution -The process by which a disputed Claim may be settled as an alternative to litigation, if Owner and Contractor cannot reach an agreement between themselves. 4. Application for Payment - The forms used by Contractor to request payments from Owner and the supporting documentation required by the Contract Documents. 5. Award Date—The date the City Council of the City of Corpus Christi (City)authorizes the City Manager or designee to execute the Contract on behalf of the City. 6. Bid — The documents submitted by a Bidder to establish the proposed Contract Price and Contract Times and provide other information and certifications as required by the Bidding Documents. 7. Bidding Documents — The solicitation documents, the proposed Contract Documents and Addenda. 8. Bidder—An individual or entity that submits a Bid to Owner. 9. Bonds - Performance Bond, Payment Bond, Maintenance Bond, and other Surety instruments executed by Surety. When in singular form, refers to individual instrument. 10. Change Order-A document issued on or after the Effective Date of the Contract,which modifies the Work, Contract Price, Contract Times, or terms and conditions of the Contract. 11. Change Proposal - A document submitted by Contractor in accordance with the requirements of the Contract Documents: a. Requesting an adjustment in Contract Price or Contract Times; b. Contesting an initial decision concerning the requirements of the Contract Documents or the acceptability of Work under the Contract Documents; c. Challenging a set-off against payment due; or d. Seeking a Modification with respect to the terms of the Contract. 12. City Engineer - The Corpus Christi City Engineer and/or designee as identified at the preconstruction conference or in the Notice to Proceed. General Conditions 007200- 10 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 13. Claim - A demand or assertion by Owner or Contractor submitted in accordance with the requirements of the Contract Documents. A demand for money or services by an entity other than the Owner or Contractor is not a Claim. Claims must be initiated by written notice, signed and sworn to be an authorized corporate officer, verifying the truth and accuracy of the Claim. 14. Constituent of Concern - Asbestos, petroleum, radioactive materials, polychlorinated biphenyls (PCBs), hazardous wastes, and substances, products, wastes, or other materials that are or become listed, regulated, or addressed pursuant to: a. The Comprehensive Environmental Response, Compensation and Liability Act, 42 U.S.C. §§9601 et seq. ("CERCLA"); b. The Hazardous Materials Transportation Act, 49 U.S.C. §§5101 et seq.; c. The Resource Conservation and Recovery Act, 42 U.S.C. §§6901 et seq. ("RCRA"); d. The Toxic Substances Control Act, 15 U.S.C. §§2601 et seq.; e. The Clean Water Act, 33 U.S.C. §§1251 et seq.; f. The Clean Air Act, 42 U.S.C. §§7401 et seq.; or g. Any other Laws or Regulations regulating, relating to, or imposing liability or standards of conduct concerning hazardous, toxic, or dangerous waste, substance, or material. 15. Contract -The entire integrated set of documents concerning the Work and describing the relationship between the Owner and Contractor. 16. Contract Amendment-A document issued on or after the Effective Date of the Contract and signed by Owner and Contractor which: a. Authorizes new phases of the Work and establishes the Contract Price, Contract Times, or terms and conditions of the Contract for the new phase of Work; or b. Modifies the terms and conditions of the Contract but does not make changes in the Work. 17. Contract Documents - Those items designated as Contract Documents in the Agreement. 18. Contract Price - The monetary amount stated in the Agreement and as adjusted by Modifications,and increases or decreases in unit price quantities, if any,that Owner has agreed to pay Contractor for completion of the Work in accordance with the Contract Documents. 19. Contract Times-The number of days or the dates by which Contractor must: a. Achieve specified Milestones; b. Achieve Substantial Completion; and c. Complete the Work. 20. Contractor-The individual or entity with which Owner has contracted for performance of the Work. General Conditions 007200- 11 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 21. Contractor's Team - Contractor and Subcontractors, Suppliers, individuals, or entities directly or indirectly employed or retained by them to perform part of the Work or anyone for whose acts they may be liable. 22. Cost of the Work - The sum of costs incurred for the proper performance of the Work as allowed by Article 15. 23. Defective - When applied to Work, refers to Work that is unsatisfactory, faulty, or deficient in that it: a. Does not conform to the Contract Documents; b. Does not meet the requirements of applicable inspections, reference standards, tests, or approvals referred to in the Contract Documents; or C. Has been damaged or stolen prior to OAR's recommendation of final payment unless responsibility for the protection of the Work has been assumed by Owner at Substantial Completion 24. Designer - The individuals or entity named as Designer in the Agreement and the subconsultants, individuals, or entities directly or indirectly employed or retained by Designer to provide design or other technical services to the Owner. Designer has responsibility for engineering or architectural design and technical issues related to the Contract Documents. Designers are Licensed Professional Engineers, Registered Architects or Registered Landscape Architects qualified to practice their profession in the State of Texas. 25. Drawings - The part of the Contract that graphically shows the scope, extent, and character of the Work. Shop Drawings and other Contractor documents are not Drawings. 26. Effective Date of the Contract -The date indicated in the Agreement on which the City Manager or designee has signed the Contract. 27. Field Order-A document issued by OAR or Designer requiring changes in the Work that do not change the Contract Price or the Contract Times. 28. Hazardous Environmental Condition - The presence of Constituents of Concern at the Site in quantities or circumstances that may present a danger to persons or property exposed to Constituents of Concern. The presence of Constituents of Concern at the Site necessary for the execution of the Work or to be incorporated in the Work is not a Hazardous Environmental Condition provided these Constituents of Concern are controlled and contained pursuant to industry practices, Laws and Regulations, and the requirements of the Contract. 29. Indemnified Costs-All costs, losses,damages,and legal or other dispute resolution costs resulting from claims or demands against Owner. These costs include fees for engineers, architects, attorneys, and other professionals. 30. Laws and Regulations; Laws or Regulations-Applicable laws,statutes, rules, regulations, ordinances,codes,and orders of governmental bodies,agencies,authorities,and courts having jurisdiction over the Project. 31. Liens - Charges, security interests, or encumbrances upon Contract related funds, real property, or personal property. General Conditions 007200- 12 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 32. Milestone-A principal event in the performance of the Work that Contractor is required by Contract to complete by a specified date or within a specified period of time. 33. Modification - Change made to the Contract Documents by one of the following methods: a. Contract Amendment; b. Change Order; C. Field Order; or d. Work Change Directive. 34. Notice of Award-The notice of Owner's intent to enter into a contract with the Selected Bidder. 35. Notice to Proceed - A notice to Contractor of the Contract Times and the date Work is to begin. 36. Owner -The City of Corpus Christi (City), a Texas home-rule municipal corporation and political subdivision organized under the laws of the State of Texas, acting by and through its duly authorized City Manager and designee, the City Engineer (the Director of Engineering Services), and the City's officers, employees, agents, or representatives, authorized to administer design and construction of the Project. 37. Owner's Authorized Representative or OAR - The individual or entity named as OAR in the Agreement and the consultants, subconsultants, individuals, or entities directly or indirectly employed or retained by them to provide construction management services to the Owner. The OAR may be an employee of the Owner. 38. Owner's Project Team or OPT - The Owner, Owner's Authorized Representative, Resident Project Representative, Designer, and the consultants, subconsultants, individuals or entities directly or indirectly employed or retained by them to provide services to the Owner. 39. Partial Occupancy or Use - Use by Owner of a substantially completed part of the Work for the purpose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work. 40. Progress Schedule -A schedule prepared and maintained by Contractor, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Times. The Progress Schedule must be a Critical Path Method (CPM) Schedule. 41. Project - The total undertaking to be accomplished for Owner under the Contract Documents. 42. Project Manual — That portion of the Contract Documents that may include the following: introductory information,solicitation requirements and responses, proposal, Contract forms and General and Supplementary Conditions, General Requirements, Specification, Drawings, Project Safety Manual and Addenda. 43. Resident Project Representative or RPR-The authorized representative of OPT assigned to assist OAR at the Site. As used herein, the term Resident Project Representative includes assistants and field staff of the OAR. General Conditions 007200- 13 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 44. Samples - Physical examples of materials, equipment, or workmanship representing some portion of the Work that are used to establish the standards for that portion of the Work. 45. Schedule of Documents -A schedule of required documents, prepared and maintained by Contractor. 46. Schedule of Values - A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for Contractor's Applications for Payment. 47. Shop Drawings - All drawings, diagrams, illustrations, schedules, and other data or information that are specifically prepared or assembled and submitted by Contractor to illustrate some portion of the Work. Shop Drawings, whether approved or not, are not Drawings and are not Contract Documents. 48. Site - Lands or areas indicated in the Contract Documents as being furnished by Owner upon which the Work is to be performed. The Site includes rights-of-way, easements, and other lands furnished by Owner which are designated for use by the Contractor. 49. Specifications -The part of the Contract that describes the requirements for materials, equipment, systems, standards, and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable to the Work. 50. Subcontractor -An individual or entity having a direct contract with Contractor or with other Subcontractors or Suppliers for the performance of a part of the Work. 51. Substantial Completion - The point where the Work or a specified part of the Work is sufficiently complete to be used for its intended purpose in accordance with the Contract Documents. 52. Supplementary Conditions - The part of the Contract that amends or supplements the General Conditions. 53. Supplier - A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with Subcontractors or other Suppliers to furnish materials or equipment to be incorporated in the Work. 54. Technical Data-Those items expressly identified as Technical Data in the Supplementary Conditions with respect to either: a. Subsurface conditions at the Site; b. Physical conditions relating to existing surface or subsurface structures at the Site, except Underground Facilities; or C. Hazardous Environmental Conditions at the Site. 55. Underground Facilities - All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, other similar facilities or appurtenances, and encasements containing these facilities which are used to convey electricity, gases, steam, liquid petroleum products, telephone or other communications, fiber optic transmissions, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 56. Unit Price Work- Work to be paid for on the basis of unit prices. General Conditions 007200- 14 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 57. Work - The construction of the Project or its component parts as required by the Contract Documents. 58. Work Change Directive - A directive issued to Contractor on or after the Effective Date of the Contract ordering an addition, deletion, or revision in the Work. The Work Change Directive serves as a memorandum of understanding regarding the directive until a Change Order can be issued. 1.02 Terminology A. The words and terms discussed in this Paragraph 1.02 are not defined, but when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. It is understood that the cost for performing Work is included in the Contract Price and no additional compensation is to be paid by Owner unless specifically stated otherwise in the Contract Documents. Expressions including or similar to "at no additional cost to Owner," "at Contractor's expense,"or similar words mean that the Contractor is to perform or provide specified operation of Work without an increase in the Contract Price. C. The terms"day"or"calendar day" mean a calendar day of 24 hours measured from midnight to the next midnight. D. The meaning and intent of certain terms or adjectives are described as follows: 1. The terms "as allowed," "as approved," "as ordered," "as directed," or similar terms in the Contract Documents indicate an exercise of professional judgment by the OPT. 2. Adjectives including or similar to "reasonable," "suitable," "acceptable," "proper," "satisfactory," or similar adjectives are used to describe a determination of OPT regarding the Work. 3. Any exercise of professional judgment by the OPT will be made solely to evaluate the Work for general compliance with the Contract Documents unless there is a specific statement in the Contract Documents indicating otherwise. 4. The use of these or similar terms or adjectives does not assign a duty or give OPT authority to supervise or direct the performance of the Work, or assign a duty or give authority to the OPT to undertake responsibilities contrary to the provisions of Articles 9 or 10 or other provisions of the Contract Documents. E. The use of the words "furnish," "install," "perform," and "provide" have the following meanings when used in connection with services, materials, or equipment: 1. Furnish means to supply and deliver the specified services, materials, or equipment to the Site or other specified location ready for use or installation. 2. Install means to complete construction or assembly of the specified services, materials, or equipment so they are ready for their intended use. 3. Perform or provide means to furnish and install specified services, materials, or equipment, complete and ready for their intended use. 4. Perform or provide the specified services, materials, or equipment complete and ready for intended use if the Contract Documents require specific services, materials, or General Conditions 007200- 15 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 equipment, but do not expressly use the words "furnish," "install," "perform," or "provide." F. Contract Documents are written in modified brief style: 1. Requirements apply to all Work of the same kind, class, and type even though the word "all" is not stated. 2. Simple imperative sentence structure is used which places a verb as the first word in the sentence. It is understood that the words "furnish," "install," "perform," "provide," or similar words include the meaning of the phrase "The Contractor shall..." before these words. 3. Unless specifically stated that action is to be taken by the OPT or others, it is understood that the action described is a requirement of the Contractor. G. Words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with this recognized meaning unless stated otherwise in the Contract Documents. H. Written documents are required where reference is made to notices, reports, approvals, consents, documents, statements, instructions, opinions or other types of communications required by the Contract Documents. Approval and consent documents must be received by Contractor prior to the action or decision for which approval or consent is given. These may be made in printed or electronic format through the OPT's project management information system or other electronic media as required by the Contract Documents or approved by the OAR. I. Giving notice as required by the Contract Documents may be by printed or electronic media using a method that requires acknowledgment of the receipt of that notice. ARTICLE 2—PRELIMINARY MATTERS 2.01 Delivery of Bonds and Evidence of Insurance A. Provide required Bonds with the executed Agreement. B. Provide evidence of insurance required by the Contract Documents with the executed Agreement. 2.02 Copies of Documents A. OPT is to furnish one fully executed Agreement (either electronic or printed) and one copy of the executed Contract Documents in electronic portable document format (PDF). This document is the Project Record Copy of the Contract Documents. 2.03 Project Management System A. Owner shall administer its design and construction management through an internet-based project management system known as e-Builder. B. Contractor shall conduct all communication through and perform all project-related functions utilizing this project management system. This includes all correspondence, General Conditions 007200- 16 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 submittals, requests for information, payment requests and processing, contract amendments, change orders, delivery orders and other administrative activities. C. Owner shall administer the software and provide training to Contractor's Team. 2.04 Before Starting Construction A. Provide the following preliminary documents in accordance with the Contract Documents within 10 days after the Effective Date of the Contract: 1. Progress Schedule, which must be a Critical Path Method (CPM) Schedule; 2. Schedule of Documents; and 3. Schedule of Values and projected cash flow information. 2.05 Preconstruction Conference; Designation of Authorized Representatives A. Attend the preconstruction conference as required by the Contract Documents. B. Designate the specific individuals authorized to act as representatives of the Contractor. These individuals must have the authority to transmit and receive information, render decisions relative to the Contract, and otherwise act on behalf of the Contractor. C. Owner is to designate the specific individuals authorized to act as representatives of the Owner and the limits of their authority with regard to acting on behalf of the Owner. ARTICLE 3—CONTRACT DOCUMENTS: INTENT, REQUIREMENTS, REUSE 3.01 Intent A. Requirements of components of the Contract Documents are as binding as if required by all Contract Documents. It is the intent of the Contract Documents to describe a functionally complete Project. The Contract Documents do not indicate or describe all of the Work required to complete the Project. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the OPT. 1. The Contract requirements described in the General Conditions and Supplementary Conditions apply to Work regardless of where it is described in the Contract Documents, unless specifically noted otherwise. 2. In offering a Bid for this Project and in entering into this Contract,Contractor represents: a. Contractor has studied the Contract Documents, the Work, the Site, local conditions, Laws and Regulations, and other conditions that may affect the Work; b. Contractor has studied the Technical Data and other information referred to in the Contract Documents and has or will make additional surveys and investigations as deemed necessary for the performance of the Work; c. Contractor has correlated these studies and observations with the requirements of the Contract Documents; and d. Contractor has taken all of this information into consideration in developing the Contract Price offered and that the Contract Price offered provides full compensation for providing the Work in accordance with the Contract Documents. General Conditions 007200- 17 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 3. Organization of the Contract Documents is not intended to control or lessen the responsibility of the Contractor when dividing Work among Subcontractors or Suppliers, or to establish the extent of Work to be performed by trades, Subcontractors, or Suppliers. Specifications or details do not need to be indicated or specified in each Specification or Drawing. Items shown in the Contract Documents are applicable regardless of their location in the Contract Documents. 4. Standard paragraph titles and other identifications of subject matter in the Specifications are intended to aid in locating and recognizing various requirements of the Specifications. Titles do not define, limit, or otherwise restrict Specification text. 5. Provide the labor, documentation, services, materials, or equipment that may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result, whether specifically called for in the Contract Documents or not. Include these related costs in the offered Contract Price. B. Provide equipment that is functionally complete as described in the Contract Documents. The Drawings and Specifications do not indicate or describe all of the Work required to complete the installation of products purchased by the Owner or Contractor. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the Designer through the OAR. C. Comply with the most stringent requirements where compliance with two or more standards is specified and they establish different or conflicting requirements for the Work, unless the Contract Documents indicate otherwise. D. Provide materials and equipment comparable in quality to similar materials and equipment incorporated in the Project or as required to meet the minimum requirements of the application if the materials and equipment are shown in the Drawings but are not included in the Specifications. E. The Project Record Copy of the Contract Documents governs if there is a discrepancy between the Project Record Copy of the Contract Documents and subsequent electronic or digital versions of the Contract Documents, including printed copies derived from these electronic or digital versions. F. The Contract supersedes all prior written or oral negotiations, representations, and agreements. The Contract Documents comprise the entire Agreement between Owner and Contractor. The Contract Documents may be modified only by a Modification. G. Request clarification from OAR for a decision before proceeding if Contractor is not clear on the meaning of the Contract Documents. OAR is to issue clarifications and interpretations of the Contract Documents in accordance with the Contract Documents. 3.02 Reference Standards A. Standard Specifications, Codes, Laws and Regulations: 1. Reference in the Contract Documents to standard specifications, manuals, reference standards, or codes of technical societies, organizations, or associations, or to Laws or Regulations,whether specific or implied, are those in effect at the time Contractor's Bid is submitted or when Contractor negotiates the Contract Price unless specifically stated otherwise in the Contract Documents. General Conditions 007200- 18 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 2. No provision of referenced standard specifications, manuals, reference standards, codes, or instructions of a Supplier changes the duties or responsibilities of OPT or Contractor from those described in the Contract Documents or assigns a duty to or gives authority to the OPT to supervise or direct the performance of the Work or undertake responsibilities inconsistent with the Contract Documents. 3. The provisions of the Contract Documents take precedence over standard specifications, manuals, reference standards, codes, or instructions of a Supplier unless specifically stated otherwise in the Contract Documents. B. Comply with applicable construction industry standards, whether referenced or not. 1. Standards referenced in the Contract Documents govern over standards not referenced but recognized as applicable in the construction industry. 2. Comply with the requirements of the Contract Documents if they produce a higher quality of Work than the applicable construction industry standards. 3. Designer determines whether a code or standard is applicable, which of several are applicable, or if the Contract Documents produce a higher quality of Work. C. Make copies of reference standards available if requested by OAR. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: 1. Carefully study the Drawings and verify pertinent figures and dimensions with respect to actual field measurements before undertaking the Work. Immediately report conflicts, errors, ambiguities, or discrepancies that Contractor discovers or has actual knowledge of to the OAR. Do not proceed with affected Work until the conflict, error, ambiguity, or discrepancy is resolved by a clarification or interpretation from the OAR or by a Modification to the Contract Documents issued pursuant to Paragraph 11.01. 2. The exactness of existing grades, elevations, dimensions or locations given on any Drawings issued by Designer, or the work installed by other contractors, is not guaranteed by Owner. Contractor shall,therefore, satisfy itself as to the accuracy of all grades, elevations, dimensions and locations. Any errors due to Contractor's failure to verify at the site all such grades, elevations, dimensions or locations relating to such existing or other work shall be rectified by Contractor without any additional cost to Owner. 3. Immediately notify the OAR of conflicts, errors, ambiguities, or discrepancies in the Contract Documents or discrepancies between the Contract Documents and: a. Applicable Laws or Regulations; b. Actual field conditions; c. Standard specifications, manuals, reference standards, or codes; or d. Instructions of Suppliers. 4. Do not proceed with affected Work until the conflict,error, ambiguity, or discrepancy is resolved by a clarification or interpretation from the OAR or by a Modification to the General Conditions 007200- 19 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Contract Documents issued pursuant to Paragraph 11.01, except in an emergency as required by Paragraph 7.12. 5. Contractor is liable to the OPT for failure to report conflicts, errors, ambiguities, or discrepancies in the Contract Documents of which Contractor has actual knowledge. 6. Contractor is deemed to have included the most expensive item, system, procedure, etc. in the Contract Price if a conflict, error, ambiguity, or discrepancy in components of the Contract Documents was known, but not reported prior to submitting the Bid or when Contractor negotiates the Contract Price. 3.04 Interpretation of the Contract Documents A. Submit questions concerning the non-technical or contractual/administrative requirements of the Contract Documents to the OAR immediately after those questions arise. OAR is to provide an interpretation of the Contract Documents regarding these questions and will coordinate the response of the OPT to Contractor. B. Submit questions regarding the design of the Project described in the Contract Documents to the OAR immediately after those questions arise. OAR is to request an interpretation of the Contract Documents from the Designer. Designer is to respond to these questions by providing an interpretation of the Contract Documents. OAR will coordinate the response of the OPT to Contractor. C. OPT may initiate a Modification to the Contract Documents through the OAR if a response to the question indicates that a change in the Contract Documents is required. Contractor may appeal Designer's or OAR's interpretation by submitting a Change Proposal. 3.05 Reuse of Documents A. Contractor's Team has no rights to the Contract Documents and may not use the Contract Documents, or copies or electronic media editions of the Contract Documents, other than for the construction of this Project. This provision survives final payment or termination of the Contract. B. Contractor is allowed to retain a copy of the Contract Documents for record purposes, unless specifically prohibited by the Owner for security reasons. Surrender paper and digital copies of the Contract Documents and other related documents and remove these documents from computer equipment or storage devices as a condition of final payment if the Owner so directs. ARTICLE 4—COMMENCEMENT AND PROGRESS OF THE WORK 4.01 Commencement of Contract Times; Notice to Proceed A. The Contract Times commence to run on the date indicated in the Notice to Proceed. 4.02 Starting the Work A. Begin performing the Work on the date indicated in the Notice to Proceed. Do not begin Work prior to having the insurance required in Article 6 in force or before the date indicated in the Notice to Proceed. General Conditions 007200- 20 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 4.03 Progress Schedule A. Construct the Work in accordance with the Progress Schedule established in accordance with the Contract Documents. 1. Adjust the Progress Schedule as required to accurately reflect actual progress on the Work. 2. Submit proposed adjustments in the Progress Schedule that change the Contract Times in accordance with the requirements of Article 11. B. Continue performing Work and adhere to the Progress Schedule during disputes or disagreements with Owner. Do not delay or postpone Work pending resolution of disputes or disagreements, or during an appeal process. 4.04 Delays in Contractor's Progress A. No Damages for Delay: Contractor shall receive no compensation for delays or hindrances to the Work,except in the case of direct interference with means and methods by the Owner. In no event shall the Contractor be entitled to any compensation or recovery of any special damages in connection with any delays, including without limitation: consequential damages, lost opportunity costs, impact damages, or other similar damages. Owner's exercise of any of its rights or remedies under the Contract Documents (including without limitation ordering changes in the Work, or directing suspension, rescheduling, or correction of the Work), regardless of the extent or frequency of Owner's exercise of such rights or remedies, shall not be construed as active interference in the Contractor's performance of the Work. An extension of Contract Time, to the extent permitted, shall be the sole remedy of the Contractor for any acknowledged delays.Contractor agrees that the extension of time provides an equitable adjustment. B. Contractor is not entitled to an adjustment in Contract Price or Contract Times for delays, disruptions, or interference caused by or within the control of Contractor's Team. C. No time extensions are allowed for weather conditions, other than those listed in Paragraph 4.04.D, for Projects using calendar days or a fixed date to establish the Contract Time. Contractor is to include the cost associated with weather related delays in the Contract Price and assumes the risks associated with delays related to weather conditions. D. Contractor is entitled to an equitable adjustment in the Contract Times if Contractor's performance or progress is delayed,disrupted or interfered with by unanticipated causes not the fault of and beyond the control of OPT or Contractor. These adjustments in Contract Times are the Contractor's sole and exclusive remedy for the delays, disruption, and interference described in this paragraph. These unanticipated causes may include: 1. Severe and unavoidable natural catastrophes e.g. fires, floods, hurricanes, epidemics, and earthquakes; 2. Acts or failures to act of utility owners performing other work at or adjacent to the Site; 3. Acts of war or terrorism; and 4. Rain days in excess of the number specified in a calendar year. General Conditions 007200- 21 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 E. Delays, disruption, and interference to the performance or progress of the Work resulting from the following are governed by Article 5: 1. The existence of a differing subsurface or physical condition; 2. An Underground Facility not shown or not indicated with reasonable accuracy by the Contract Documents; and 3. Hazardous Environmental Conditions. F. Article 8 governs delays, disruption, and interference to the performance or progress of the Work resulting from the performance of certain other work at or adjacent to the Site. G. Notify the OAR immediately of a potential delaying, disrupting, or interfering event. Submit a Change Proposal seeking an adjustment in Contract Price or Contract Times within 30 days of the commencement of the delaying, disrupting, or interfering event. Claims for adjustment to the Contract Price or Contract Times that do not comply with Article 13 are waived. H. Contractor is only entitled to an adjustment of the Contract Times for specific delays, disruptions, and interference to the performance or progress of the Work that can be demonstrated to directly impact the ability of the Contractor to complete the Work within the Contract Times. No adjustments in Contract Times are allowed for delays on components of the Work which were or could have been completed without impacting the Contract Times. I. Contractor is not entitled to an adjustment in Contract Price or Contract Times for delay, disruption, or interference caused by or within the control of the Owner if this delay is concurrent with a delay, disruption, or interference attributable to or within the control of the Contractor's Team. ARTICLE 5—AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS 5.01 Availability of Lands A. Owner is to furnish the Site and inform the Contractor of encumbrances or restrictions known to Owner related to use of the Site with which Contractor must comply in performing the Work. B. Provide for additional lands and access Contractor requires for temporary construction facilities or storage of materials and equipment, other than those identified in the Contract Documents. Provide documentation of authority to use these additional lands to OAR before using them. 5.02 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Confine construction equipment, temporary construction facilities, the storage of materials and equipment, and the operations of workers to the Site,adjacent areas that Owner or Contractor has arranged to use through construction easements or agreements, and other adjacent areas as permitted by Laws and Regulations. Assume General Conditions 007200- 22 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 full responsibility for damage or injuries which result from the performance of the Work or from other actions or conduct of the Contractor's Team, including: a. Damage to the Site; b. Damage to adjacent areas used for Contractor's Team's operations; C. Damage to other adjacent land or areas; and d. Injuries and losses sustained by the owners or occupants of these lands or areas. 2. Take the following action if a damage or injury claim is made by the owner or occupant of adjacent land or area because of the performance of the Work, or because of other actions or conduct of the Contractor's Team: a. Take immediate corrective or remedial action as required by Paragraph 7.09; and b. Attempt to settle the claim through negotiations with the owner or occupant, or otherwise resolve the claim by mediation or other dispute resolution proceeding or at law. 5.03 Subsurface and Physical Conditions A. The Supplementary Conditions identify: 1. Those reports known to OPT of explorations and tests of subsurface conditions at or adjacent to the Site; 2. Those drawings known to OPT of physical conditions related to existing surface or subsurface structures at the Site, except Underground Facilities; and 3. Technical Data contained in these reports and drawings. B. Data contained in boring logs, recorded measurements of subsurface water levels, and the results of tests performed on materials described in geotechnical data reports specifically prepared for the Project and made available to Contractor are defined as Technical Data, unless Technical Data has been defined more specifically in the Supplementary Conditions. C. Contractor may rely upon the accuracy of the Technical Data contained in these reports and drawings, but these reports and drawings are not Contract Documents. Except for this reliance on Technical Data,Contractor may not rely upon or make claims against Owner with respect to: 1. The completeness of reports and drawings for Contractor's purposes, including aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, or Contractor's safety precautions and programs; 2. Other data, interpretations, opinions, and information contained in these reports or shown or indicated in the drawings; or 3. Contractor's interpretation of or conclusions drawn from Technical Data or other data, interpretations, opinions, or information. General Conditions 007200- 23 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 5.04 Differing Subsurface or Physical Conditions A. Notify OAR immediately, but in no event later than 3 days, after becoming aware of a subsurface or physical condition that is uncovered or revealed at the Site,and before further disturbing the subsurface or physical conditions or performing any related Work that: 1. Establishes that the Technical Data on which Contractor is entitled to rely as provided in Paragraph 5.03 is materially inaccurate; 2. Requires a change in the Drawings or Specifications; 3. Differs materially from that shown or indicated in the Contract Documents; or 4. Is of an unusual nature and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents. Do not further disturb or perform Work related to this subsurface or physical condition, except in an emergency as required by Paragraph 7.12, until permission to do so is issued by OAR. B. OAR is to notify the OPT after receiving notice of a differing subsurface or physical condition from the Contractor. Designer is to: 1. Promptly review the subsurface or physical condition; 2. Determine the necessity of OPT's obtaining additional exploration or tests with respect to the subsurface or physical condition; 3. Determine if the subsurface or physical condition falls within one or more of the differing Site condition categories in Paragraph 5.04.A; 4. Prepare recommendations to OPT regarding the Contractor's resumption of Work in connection with the subsurface or physical condition in question; 5. Determine the need for changes in the Drawings or Specifications; and 6. Advise OPT of Designer's findings, conclusions, and recommendations. C. OAR is to issue a statement to Contractor regarding the subsurface or physical condition in question and recommend action as appropriate after review of Designer's findings, conclusions, and recommendations. D. Possible Contract Price and Contract Times Adjustments: 1. Contractor is entitled to an equitable adjustment in Contract Price or Contract Times to the extent that a differing subsurface or physical condition causes a change in Contractor's cost or time to perform the Work provided the condition falls within one or more of the categories described in Paragraph 5.04.A. Any adjustment in Contract Price for Work that is paid for on a unit price basis is subject to the provisions of Paragraph 15.03. General Conditions 007200- 24 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 2. Contractor is not entitled to an adjustment in the Contract Price or Contract Times with respect to a subsurface or physical condition if: a. Contractor knew of the existence of the subsurface or physical condition at the time Contractor made an offer to Owner with respect to Contract Price and Contract Times; b. The existence of the subsurface or physical condition could have been discovered or revealed as a result of examinations, investigations, explorations, tests, or studies of the Site and contiguous areas expressly required by the Bidding Requirements or Contract Documents prior to when Contractor's Bid is submitted or when Contractor negotiates the Contract Price; or c. Contractor failed to give notice as required by Paragraph 5.04.A. 3. Contractor may submit a Change Proposal no later than 30 days after OAR's issuance of the OPT's statement to Contractor regarding the subsurface or physical condition in question. 4. A Change Order is to be issued by the OAR if Owner and Contractor agree that Contractor is entitled to an adjustment in the Contract Price or Contract Times and agree to the amount or extent of adjustments in the Contract Price or Contract Times. 5.05 Underground Facilities A. The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or adjacent to the Site is based on information and data furnished to OPT by the owners of these Underground Facilities or by others. OPT is not responsible for the accuracy or completeness of information or data provided by others that OPT makes available to Contractor. The Contractor is responsible for: 1. Investigating and field-verifying the location of underground facilities before beginning Work; 2. Reviewing and checking available information and data regarding existing Underground Facilities at the Site; 3. Complying with Laws and Regulations related to locating Underground Facilities before beginning Work; 4. Locating Underground Facilities shown or indicated in the Contract Documents; 5. Coordinating the Work with the owners, including Owner, of Underground Facilities during construction; and 6. The safety and protection of existing Underground Facilities at or adjacent to the Site and repairing damage resulting from the Work. B. Notify the OAR and the owner of the Underground Facility immediately, but in no event later than 3 days, if an Underground Facility is uncovered or revealed at the Site that was not shown in the Contract Documents or was not shown with reasonable accuracy in the Contract Documents. Do not further disturb conditions or perform Work affected by this discovery, except in the event of an emergency as required by Paragraph 7.12. General Conditions 007200- 25 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 C. The Designer is to take the following action after receiving notice from the OAR: 1. Promptly review the Underground Facility and conclude whether the Underground Facility was not shown or indicated in the Contract Documents, or was not shown or indicated with reasonable accuracy; 2. Prepare recommendations to OPT regarding the Contractor's resumption of Work in connection with this Underground Facility; 3. Determine the extent to which a change is required in the Drawings or Specifications to document the consequences of the existence or location of the Underground Facility; and 4. Advise OAR of Designer's findings, conclusions, and recommendations and provide revised Drawings and Specifications if required. D. OAR is to issue a statement to Contractor regarding the Underground Facility in question and recommend action as appropriate after review of Designer's findings, conclusions, and recommendations. E. Contractor is entitled to an equitable adjustment in the Contract Price or Contract Times as provided in Paragraphs 11.04 and 11.05 to the extent that the existing Underground Facility at the Site that was not shown or indicated in the Contract Documents or was not shown or indicated with reasonable accuracy. Any adjustment in Contract Price for Work that is paid for on a unit price basis is subject to the provisions of Paragraph 15.03. F. Contractor is not entitled an adjustment in the Contract Price or Contract Times with respect to an existing Underground Facility at the Site if: 1. Contractor knew of the existence of the existing Underground Facility at the Site at the time Contractor made an offer to Owner with respect to Contract Price and Contract Times; 2. The existence of the existing Underground Facility at the Site could have been discovered or revealed as a result of examinations, investigations, explorations, tests, or studies of the Site and contiguous areas expressly required by the Bidding Requirements or Contract Documents prior to when Contractor's Bid is submitted or when Contractor negotiates the Contract Price; or 3. Contractor failed to give notice as required by Paragraph 5.05.8. G. Contractor may submit a Change Proposal regarding its entitlement to or the amount or extent of adjustments in the Contract Price or Contract Times no later than 30 days after OAR's issuance of OPT's statement to Contractor regarding the Underground Facility. 5.06 Hazardous Environmental Conditions at Site A. The Supplementary Conditions identify: 1. Those reports and drawings known to OPT relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site; and 2. Technical Data contained in these reports and drawings. B. Contractor may rely upon the accuracy of the Technical Data contained in reports and drawings relating to Hazardous Environmental Conditions identified in the Supplementary General Conditions 007200- 26 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Conditions, but these reports and drawings are not Contract Documents. Except for the reliance on expressly identified Technical Data,Contractor may not rely upon or make claims against Owner's Indemnitees with respect to: 1. The completeness of these reports and drawings for Contractor's purposes, including aspects of the means, methods, techniques, sequences and procedures of construction to be employed by Contractor or Contractor's safety precautions and programs related to Hazardous Environmental Conditions; 2. Other data, interpretations, opinions, and information contained in these reports or shown or indicated in the drawings; or 3. Any Contractor interpretation of or conclusion drawn from Technical Data or other data, interpretations, opinions or information. C. The results of tests performed on materials described in environmental reports specifically prepared for the Project and made available to Contractor are defined as Technical Data unless Technical Data has been defined more specifically in the Supplementary Conditions. D. Contractor is not responsible for removing or remediating Hazardous Environmental Conditions encountered, uncovered or revealed at the Site unless this removal or remediation is expressly identified in the Contract Documents to be within the scope of the Work. E. Contractor is responsible for controlling, containing, and duly removing and remediating Constituents of Concern brought to the Site by Contractor's Team and paying associated costs. 1. Owner may remove and remediate the Hazardous Environmental Condition and impose a set-off against payments to Contractor for associated costs if Contractor's Team creates a Hazardous Environmental Condition, and Contractor does not take acceptable action to remove and remediate the Hazardous Environmental Condition. 2. Contractor's obligation to indemnify Owner for claims arising out of or related to Hazardous Environmental Conditions are as set forth in Paragraph 7.14. F. Immediately notify the OAR and take the following action if Contractor uncovers or reveals a Hazardous Environmental Condition at the Site or adjacent areas used by the Contractor's Team that was not created by the Contractor's Team: 1. Secure or otherwise isolate this condition; 2. Stop Work in affected areas or connected with the condition, except in an emergency as required by Paragraph 7.12; and 3. Do not resume Work in connection with the Hazardous Environmental Condition or in affected areas until after OPT has obtained required permits and OAR sends notice to the Contractor: a. Specifying that this condition and affected areas are or have been rendered safe for the resumption of Work; or b. Specifying special conditions under which Work may be resumed safely. General Conditions 007200- 27 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 4. Owner may order the portion of the Work that is in the area affected by the Hazardous Environmental Condition to be deleted from the Work following the procedures in Article 11 if Contractor does not agree to: a. Resume the Work based on a reasonable belief it is unsafe; or b. Resume the Work under the special conditions provided by the OAR. 5. Owner may have this deleted portion of the Work performed by Owner's own forces or others in accordance with Article 8. G. Contractor may submit a Change Proposal or Owner may impose a set-off if an agreement is not reached within 10 days of OAR's notice regarding the resumption of Work as to whether Contractor is entitled to an adjustment in Contract Price or Contract Times or on the amount or extent of adjustments resulting from this Work stoppage or special conditions under which Contractor agrees to resume Work. H. The provisions of Paragraphs 5.03, 5.04, and 5.05 do not apply to the presence of Constituents of Concern or a Hazardous Environmental Condition uncovered or revealed at the Site. ARTICLE 6—BONDS AND INSURANCE 6.01 Performance, Payment, and Other Bonds A. Furnish Performance and Payment Bonds, each in an amount equal to the Contract Price, as security for the faithful performance and payment of Contractor's obligations under the Contract Documents. These Bonds are to remain in effect until 1 year after the date of final payment. Furnish other Bonds as required by the Contract Documents. B. Bonds furnished by the Contractor must meet the requirements of Texas Insurance Code Chapter 3503, Texas Government Code Chapter 2253, and all other applicable Laws and Regulations. C. Notify OAR immediately if the surety on Bonds furnished by Contractor: 1. Is declared bankrupt, or becomes insolvent; 2. Has its right to do business in Texas terminated; or 3. Ceases to meet the requirements of Paragraph 6.02. Provide a Bond and surety which comply with the requirements of Paragraph 6.02 within 20 days after the event giving rise to this notification. D. Contractor is to use amounts paid by Owner to Contractor under the Contract for the performance of the Contract and to satisfy claims against the Payment Bond. E. Notify the OAR of claims filed against the Payment Bond. Notify the claimant and OAR of undisputed amounts and the basis for challenging disputed amounts when a claimant has satisfied the conditions prescribed by Texas Government Code Chapter 2253. Promptly pay undisputed amount. F. Owner is not liable for payment of costs or expenses of claimants under the Payment Bond. Owner has no obligations to pay, give notice or take other action to claimants under the Payment Bond. General Conditions 007200- 28 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 G. Owner may exclude the Contractor from the Site and exercise Owner's termination rights under Article 18 if Contractor fails to obtain or maintain required Bonds. H. OPT will provide a copy of the Payment Bond to Subcontractors, Suppliers, or other persons or entities claiming to have furnished labor or materials used in the performance of the Work that request this information in accordance with Texas Government Code Chapter 2253. 6.02 Licensed Sureties A. Provide Bonds in the form prescribed by the Contract Documents from sureties named in the list of"Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. B. Provide Bonds required by the Contract Documents from surety companies that are duly licensed or authorized to provide bonds in the State of Texas. 6.03 Required Minimum Insurance Coverage A. Obtain and maintain insurance as required in this Article and in the Supplementary Conditions. B. Deliver evidence of insurance in accordance with the Supplementary Conditions to the Owner to demonstrate that Contractor has obtained and is maintaining the policies, coverages, and endorsements required by the Contract. Provide copies of these certificates to each named insured and additional insured as identified in the Supplementary Conditions or otherwise. 6.04 General Insurance Provisions A. Provide insurance coverages and limits meeting the requirements for insurance in accordance with this Article 6 and the Supplementary Conditions. B. Provide endorsements to the policies as outlined in this Article. C. Obtain insurance from companies that are duly licensed or authorized in the State of Texas to issue insurance policies for the required limits and coverages. Provide insurance from companies that have an A.M. Best rating of A-VIII or better. D. Furnish copies of endorsements and documentation of applicable self-insured retentions and deductibles upon request by OPT or any named insured or additional insured. Contractor may block out (redact) any confidential premium or pricing information contained in any endorsement furnished under this Contract. E. The name and number of the Project must be referenced on the certificate of insurance. F. OPT's failure to demand such certificates or other evidence of the Contractor's full compliance with the insurance requirements or failure to identify a deficiency in compliance from the evidence provided is not a waiver of the Contractor's obligation to obtain and maintain the insurance required by the Contract Documents. G. Notify the Owner if the Contractor fails to purchase or maintain the insurance required by the Contract Documents. Contractor shall not be allowed to perform any Work on the General Conditions 007200- 29 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Project until the required insurance policies are in effect. A Certificate of Liability Insurance shall be submitted to the OPT. H. Owner may exclude the Contractor from the Site and exercise Owner's termination rights under Article 18 if Contractor fails to obtain or maintain the required insurance. I. Owner does not represent that the insurance coverage and limits established in this Contract are adequate to protect Contractor or Contractor's interests. J. The required insurance and insurance limits do not limit the Contractor's liability under the indemnities granted to Owner in the Contract Documents. K. Provide for an endorsement that the "other insurance" clause shall not apply to the OPT where the OPT is an additional insured shown on the policy. Contractor's insurance is primary and non-contributory with respect to any insurance or self-insurance carried by the OPT for liability arising out of operations under this Contract. L. Include the Owner and list the other members of the OPT and any other individuals or entities identified in the Supplementary Conditions as additional insureds on all policies with the exception of the workers' compensation policy and Contractor's professional liability policy. 6.05 Contractor's Insurance A. Purchase and maintain workers' compensation and employer's liability insurance for: 1. Claims under workers' compensation, disability benefits, and other similar employee benefit acts. Obtain workers' compensation coverage through a licensed insurance company in accordance with Texas law and written on a policy and endorsements approved by the Texas Department of Insurance. Provide insurance in amounts to meet all workers' compensation obligations. Provide an "All Other States" endorsement if Contractor is not domiciled in Texas and policy is not written in accordance with Texas Department of Insurance rules. 2. Claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. United States Longshoreman and Harbor Workers' Compensation Act and Jones Act coverage (if applicable). 4. Foreign voluntary worker compensation (if applicable). B. Purchase and maintain commercial general liability insurance covering all operations by or on behalf of Contractor. The expected coverage is that which would be included in a commercially available ISO Commercial General Liability policy and should provide coverage on an occurrence basis, against: 1. Claims for damages because of bodily injury,sickness or disease,or death of any person other than Contractor's employees; 2. Claims for damages insured by reasonably available personal injury liability coverage which are sustained; 3. By any person as a result of an offense directly or indirectly related to the employment of such person by Contractor; and General Conditions 007200-30 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 4. Claims for damages, other than to the Work itself, because of injury to or destruction of tangible property wherever located, including any resulting loss of use. C. Provide Contractor's commercial general liability policy that is written on a 1996 (or later) ISO commercial general liability form (occurrence form) and include the following coverages and endorsements: 1. Products and completed operations coverage as required in this Article and the Supplementary Conditions. Insurance is to remain in effect for 3 years after final payment. Furnish evidence of the continuation of this insurance at final payment and again each year for 3 years after final payment to Owner and each named insured or additional insured. a. If required by the Supplementary Conditions, provide and maintain Installation Floater insurance for property under the care, custody, or control of Contractor. Provide Installation Floater insurance that is a broad form or "All Peril" policy providing coverage for all materials, supplies, machinery, fixtures, and equipment which will be incorporated into the Work. 1) Provide coverage under the Contractor's Installation Floater that includes: a) Faulty or Defective workmanship, materials, maintenance, or construction; b) Cost to remove Defective or damaged Work from the Site or to protect it from loss or damage; c) Cost to cleanup and remove pollutants; d) Coverage for testing and startup; e) Any loss to property while in transit; f) Any loss at the Site; g) Any loss while in storage, both on and off the Site; and h) Any loss to temporary Project Works if their value is included in the Contract Price. 2) Coverage cannot be contingent on an external cause or risk or limited to property for which the Contractor is legally liable. Provide limits of insurance adequate to cover the value of the installation. Pay any deductible carried under this coverage and assume responsibility for claims on materials, supplies, machinery, fixtures, and equipment which will be incorporated into the Work while in transit or in storage. 2. Blanket contractual liability coverage for Contractor's contractual indemnity obligations in Paragraph 7.14, and all other contractual indemnity obligations of Contractor in the Contract Documents. Industry standard ISO Contractual Liability coverage will meet this obligation. 3. Broad form property damage coverage. 4. Severability of interest. 5. Underground explosion and collapse coverage. General Conditions 007200-31 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 6. Personal injury coverage. 7. Endorsement CG 2032, "Additional Insured - Engineers, Architects or Surveyors Not Engaged by the Named Insured" or its equivalent. D. Purchase and maintain automobile liability insurance against claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, maintenance or use of any motor vehicle. E. For Projects with a Contract Value that exceeds$5,000,000, purchase and maintain umbrella or excess liability insurance written over the underlying employer's liability, commercial general liability, and automobile liability insurance described in the paragraphs above. Provide coverage that is at least as broad as all underlying policies. Provide a policy that provides first-dollar liability coverage as needed. F. Provide Contractor's commercial general liability and automobile liability policies that: 1. Are written on an occurrence basis; 2. Include the individuals or entities identified in the Supplementary Conditions as additional insureds; 3. Include coverage for Owner as defined in Article 1; and 4. Provide primary coverage for all claims covered by the policies, including those arising from both ongoing and completed operations. G. Purchase and maintain insurance coverage for third-party injury and property damage claims, including clean-up costs that result from Hazardous Environmental Conditions which result from Contractor's operations and completed operations. Provide Contractor's pollution liability insurance that includes long-term environmental impacts for the disposal of pollutants/contaminants and is not limited to sudden and accidental discharge. The completed operations coverage is to remain in effect for 3 years after final payment. The policy must name OPT and any other individuals and entities identified in the Supplementary Conditions as additional insureds. H. Purchase and maintain applicable professional liability insurance, or have Subcontractors and Suppliers do so, if Contractor or any Subcontractor or Supplier will provide or furnish professional services under this Contract. I. The policies of insurance required by this Article must: 1. Include at least the specific coverages and be written for not less than the limits of liability provided in this Article or the Supplementary Conditions or required by Laws or Regulations, whichever is greater. 2. Contain a provision that coverage afforded will not be canceled or materially changed until at least 30 days prior written notice has been given to Contractor, Owner, and all named insureds and additional insureds. 3. Remain in effect at all times when Contractor is performing Work or is at the Site to conduct tasks arising from the Contract Documents. 4. Be appropriate for the Work being performed and provide protection from claims resulting from the Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether performed by Contractor, General Conditions 007200-32 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Subcontractor, Supplier, anyone directly or indirectly employed or retained by any of them, or by anyone for whose acts they may be liable. J. The coverage requirements for specific policies of insurance must be met directly by those policies and may not rely on excess or umbrella insurance provided in other policies to meet the coverage requirement. 6.06 Property Insurance A. Purchase and maintain builder's risk insurance in the amount of the full replacement cost of the Project. This policy is subject to the deductible amounts requirements in this Article and the Supplementary Conditions or those required by Laws and Regulations and must comply with the requirements of Paragraph 6.09. This insurance shall: 1. Include the OPT,Contractor,and all Subcontractors,and any other individuals or entities identified in the Supplementary Conditions, as named insureds. 2. Be written on a builder's risk "all risk" policy form that includes insurance for physical loss or damage to the Work, temporary buildings, falsework, and materials and equipment in transit, and insures against at least the following perils or causes of loss: fire; lightning; windstorm; riot; civil commotion; terrorism; vehicle impact; aircraft; smoke; theft; vandalism and malicious mischief; mechanical breakdown, boiler explosion, and artificially generated electric current; earthquake; volcanic activity, and other earth movement; flood; collapse; explosion; debris removal; demolition occasioned by enforcement of Laws and Regulations; water damage (other than that caused by flood); and such other perils or causes of loss as may be specifically required by this Section. If insurance against mechanical breakdown, boiler explosion, and artificially generated electric current; earthquake; volcanic activity, and other earth movement; or flood, are not commercially available under builder's risk, by endorsement or otherwise, this insurance may be provided through other insurance policies acceptable to Owner and Contractor. 3. Cover expenses incurred in the repair or replacement of any insured property. 4. Cover materials and equipment in transit or stored prior to being incorporated in the Work. 5. Cover Owner-furnished or assigned property. 6. Allow for partial utilization of the Work by Owner. 7. Allow for the waiver of the insurer's subrogation rights as set forth below. 8. Provide primary coverage for all losses and damages caused by the perils or causes of loss covered. 9. Not include a co-insurance clause. 10. Include a broad exception for ensuing losses from physical damage or loss with respect to any Defective workmanship, design, or materials exclusions. 11. Include testing and startup. 12. Be maintained in effect until the Work as a whole is complete, unless otherwise agreed to in writing by Owner and Contractor. General Conditions 007200-33 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 B. Evidence of insurance provided must contain a provision or endorsement that the coverage afforded will not be canceled or materially changed or renewal refused until at least 30 days' prior written notice has been given to Owner and Contractor and to each named insured. C. Pay for costs not covered by the policy deductible. D. Notify builder's risk insurance provider if Owner will occupy or use a portion or portions of the Work prior to Substantial Completion of all the Work. Maintain the builder's risk insurance in effect during this Partial Occupancy or Use. E. Contractor may purchase other special insurance to be included in or to supplement the builder's risk or property insurance policies provided under this Article and the Supplementary Conditions. F. Contractor, Subcontractors, or employees of the Contractor or a Subcontractor owning property items, such as tools, construction equipment, or other personal property not expressly covered in the insurance required by the Contract Documents are responsible for providing their own insurance. 6.07 Waiver of Rights A. Insurance shall include a waiver of subrogation in favor of the additional insureds identified in the Supplementary Conditions. B. All policies purchased in accordance with this Article are to contain provisions to the effect that the insurers have no rights of recovery against OPT, named insureds or additional insureds in the event of a payment for loss or damage. Contractor and insurers waive all rights against the Owner's Indemnities for losses and damages created by or resulting from any of the perils or causes of loss covered by these policies and any other applicable property insurance. None of these waivers extend to the rights Contractor has to the proceeds of insurance as trustee. C. Contractor is responsible for assuring that agreements with Subcontractors contain provisions that the Subcontractor waive all rights against Owner,Contractor, named insureds and additional insureds, and the officers, directors, members, partners, employees, agents, consultants, and subcontractors of each and any of them,for all losses and damages created by or resulting from any of the perils or causes of loss covered by builder's risk insurance and other property insurance. 6.08 Owner's Insurance for Project A. Owner is not responsible for purchasing and maintaining any insurance to protect the interest of the Contractor, Subcontractors, or others in the Work. The stated limits of insurance required are minimum only. Determine the limits that are adequate. These limits may be basic policy limits or any combination of basic limits and umbrella limits. In any event, Contractor is fully responsible for all losses arising out of, resulting from, or connected with operations under this Contract whether or not these losses are covered by insurance. The acceptance of evidence of insurance by the OPT, named insureds,or additional insureds does not release the Contractor from compliance with the insurance requirements of the Contract Documents. General Conditions 007200-34 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 6.09 Acceptable Evidence of Insurance A. Provide evidence of insurance acceptable to the Owner with the executed Contract Documents. Provide the following as evidence of insurance: 1. Certificates of Insurance on an acceptable form; 2. Riders or endorsements to policies; and 3. Policy limits and deductibles. B. Provide a list of"Additional Insureds"for each policy. C. Provide evidence that waivers of subrogation are provided on all applicable policies. D. Provide evidence of requirements for 30 days' notice before cancellation or any material change in the policy's terms and conditions, limits of coverage, or change in deductible amount. 6.10 Certificate of Insurance A. Submit Certificates of Insurance meeting the following requirements: 1. Form has been filed with and approved by the Texas Department of Insurance under Texas Insurance Code §1811.101; or 2. Form is a standard form deemed approved by the Department under Texas Insurance Code §1811.101. 3. No requirements of this Contract may be interpreted as requiring the issuance of a certificate of insurance on a certificate of insurance form that has not first been filed with and approved by the Texas Department of Insurance. B. Include the name of the Project in the description of operations box on the certificate of insurance. 6.11 Insurance Policies A. If requested by the Owner, make available for viewing a copy of insurance policies, declaration pages and endorsements, and documentation of applicable self-insured retentions and deductibles. B. Contractor may block out (redact) any proprietary information or confidential premium pricing information contained in any policy or endorsement furnished under this Contract. 6.12 Continuing Evidence of Coverage A. Provide updated, revised, or new evidence of insurance in accordance this Article and the Supplementary Conditions prior to the expiration of existing policies. B. Provide evidence of continuation of insurance coverage at final payment and for the following 3 years. 6.13 Notices Regarding Insurance A. Notices regarding insurance are to be sent to the Owner at the following address: General Conditions 007200-35 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 City of Corpus Christi— Engineering Attn: Construction Contract Admin. P.O. Box 9277 Corpus Christi, TX 78469-9277 B. Submit questions regarding insurance requirements to the Construction Contract Administrator by calling 361-826-3530. 6.14 Texas Workers' Compensation Insurance Required Notice A. Definitions: 1. Certificate of coverage ("certificate") -A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC- 81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the Project. 2. Duration of the Project-includes the time from the beginning of the Work on the Project until the Contractor's/person's Work on the Project has been completed and accepted by the governmental entity. 3. Persons providing services on the Project ("Subcontractor" in §406.096) - includes all persons or entities performing all or part of the services the Contractor has undertaken to perform on the Project, regardless of whether that person contracted directly with the Contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the Project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the Project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the Contractor providing services on the Project, for the duration of the Project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the Contract. D. If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the Project,the Contractor must, prior to the end of the coverage period,file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project, and provide to the governmental entity: 1. A certificate of coverage, prior to that person beginning Work on the Project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the Project; and General Conditions 007200-36 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 2. No later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. F. The Contractor shall retain all required certificates of coverage for the duration of the Project and for one year thereafter. G. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery,within 10 days after the Contractor knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the Project. H. The Contractor shall post on each Project Site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the Project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. I. The Contractor shall contractually require each person with whom it contracts to provide services on a project, to: 1. Provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements,which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the Project,for the duration of the Project; 2. Provide to the Contractor, prior to that person beginning Work on the Project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the Project,for the duration of the Project; 3. Provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; 4. Obtain from each other person with whom it contracts, and provide to the Contractor: a. A certificate of coverage, prior to the other person beginning Work on the Project; and b. A new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; 5. Retain all required certificates of coverage on file for the duration of the Project and for one year thereafter; 6. Notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the Project; and 7. Contractually require each person with whom it contracts, to perform as required by this section, with the certificates of coverage to be provided to the person for whom they are providing services. J. By signing this Contract or providing or causing to be provided a certificate of coverage, the Contractor is representing to the governmental entity that all employees of the Contractor who will provide services on the Project will be covered by workers' compensation coverage for the duration of the Project, that the coverage will be based on proper reporting of General Conditions 007200-37 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. K. The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the governmental entity to declare the Contract void if the Contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. ARTICLE 7—CONTRACTOR'S RESPONSIBILITIES 7.01 Supervision and Superintendence A. Supervise, inspect, and direct the performance of the Work in accordance with the Contract Documents. Contractor is solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. Provide a competent resident superintendent acceptable to the OPT. The resident superintendent or acceptable qualified assistant is to be present at all times when Work is being done. Do not replace this resident superintendent except under extraordinary circumstances. Provide a replacement resident superintendent equally competent to the previous resident superintendent if replacement is required. Notify the Owner prior to replacing the resident superintendent and obtain Owner's consent to the change in superintendent. 7.02 Labor; Working Hours A. Provide competent, suitably qualified personnel to survey and lay out the Work and perform Work to complete the Project. Maintain good discipline and order at the Site. B. Perform Work at the Site during regular working hours except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent to the Site and except as otherwise stated in the Contract Documents. Regular working hours are between sunrise and sundown Monday through Saturday unless other times are specifically authorized in writing by OAR. C. Do not perform Work on a Sunday or legal holiday without OAR's consent. The following legal holidays are observed by the Owner: Holiday Date Observed New Year's Day January 1 Martin Luther King Jr Day Third Monday in January Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Thanksgiving Day Fourth Thursday in November General Conditions 007200-38 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Holiday Date Observed Friday after Thanksgiving Friday after Thanksgiving Christmas Day December 25 D. If a legal holiday falls on a Saturday, it will be observed the preceding Friday. If a legal holiday falls on a Sunday, it will be observed the following Monday. E. Pay additional cost incurred by Owner for services of the OAR or RPR to observe Work constructed outside of regular working hours. OAR will issue a Set-off in the Application for Payment for this cost per Paragraph 17.01.13 7.03 Services, Materials, and Equipment A. Provide services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and other facilities and incidentals necessary for the performance, testing, start-up, and completion of the Work, whether or not these items are specifically called for in the Contract Documents. B. Provide new materials and equipment to be incorporated into the Work. Provide special warranties and guarantees required by the Contract Documents. Provide satisfactory evidence, including reports of required tests, as to the source, kind, and quality of materials and equipment as required by the Contract Documents or as requested by the OAR. C. Store, apply, install, connect, erect, protect, use, clean, and condition materials and equipment in accordance with instructions of the applicable Supplier, unless otherwise required by the Contract Documents. 7.04 Concerning Subcontractors, Suppliers, and Others A. Contractor may retain Subcontractors and Suppliers for the performance of parts of the Work. All Subcontractors and Suppliers must be acceptable to Owner. B. Contractor must retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of designated parts of the Work if required to do so by the Contract Documents. C. Submit a list of proposed Subcontractors and Suppliers to OAR prior to entering into binding subcontracts or purchase orders. These proposed Subcontractors or Suppliers are deemed acceptable to Owner unless Owner raises a substantive, reasonable objection within 30 days after receiving this list. Under no circumstances shall any Subcontractor debarred under Chapter 41 of The Code of Ordinances, City of Corpus Christi, be deemed acceptable to Owner. D. Contractor is not required to retain Subcontractors, Suppliers, or other individuals or entities to furnish or perform part of the Work after the Effective Date of the Contract if Contractor has reasonable objection. E. Owner may require the replacement of Subcontractors, Suppliers, or other individuals or entities retained by the Contractor. Provide an acceptable replacement for the rejected Subcontractor, Supplier, or other individual or entity. Owner also may require Contractor to retain specific replacements, subject to Contractor's reasonable objections. General Conditions 007200-39 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 F. Contractor maybe entitled to an adjustment in Contract Price or Contract Times with respect to a replacement of Subcontractors, Suppliers, or other entities required by Owner. The Contractor is not entitled to an adjustment in Contract Price or Contract Time with respect to replacement of any individual deemed unsuitable by the OPT. Notify OAR immediately if a replacement of Subcontractors, Suppliers, or other entity increases the Contract Price or Contract Times. Initiate a Change Proposal for the adjustment within 10 days of Owner's notice to replace a Subcontractor,Supplier,or other entity retained by Contractor to perform part of the Work. Do not make the replacement until the change in Contract Price or Contract Times has been accepted by the Owner if Change Proposal is to be submitted. G. Owner's initial acceptance of Subcontractors, Suppliers, or other individuals or entities, or their replacements, does not constitute a waiver of the obligation of the Contractor to complete the Work in accordance with the Contract Documents. H. Maintain a current and complete list of Subcontractors and Suppliers that are to perform or furnish part of the Work. I. Contractor is fully responsible for the acts and omissions of Subcontractors, Suppliers, and other individuals or entities performing or furnishing Work. J. Contractor is solely responsible for scheduling and coordinating the work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing Work. K. Require Subcontractors, Suppliers, and other individuals or entities performing or furnishing Work to communicate with OPT through Contractor. L. Contracts between the Contractor and their Subcontractors or Suppliers may specifically bind the Subcontractors or Suppliers to the applicable terms and conditions of the Contract Documents. Contractor is responsible for meeting the requirements of the Contract Documents if they choose to not bind the Subcontractors or Suppliers to applicable terms or conditions of the Contract Documents. 1. All Subcontractors employed on this Project must be required to obtain Workers' Compensation Insurance. 2. Proof of this insurance will be required prior to the start of any Work. M. OPT may furnish information about amounts paid to Contractor for Work provided by Subcontractors or Suppliers to the entity providing the Work. N. Nothing in the Contract Documents: 1. Creates a contractual relationship between members of the OPT and members of the Contractor's Team. 2. Creates an obligation on the part of the Owner to pay or to see to the payment of money due members of the Contractor's Team, except as may be required by Laws and Regulations. 7.05 Patent Fees and Royalties A. Pay license fees, royalties, and costs incident to the use of inventions, designs, processes, products, or devices which are patented or copyrighted by others in the performance of the Work, or to incorporate these inventions, designs, processes, products, or devices which are patented or copyrighted by others in the Work. The Contract Documents identify inventions, General Conditions 007200-40 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 designs, processes, products, or devices OPT knows are patented or copyrighted by others or that its use is subject to patent rights or copyrights calling for the payment of a license fee or royalty to others. Contractor is to include the cost associated with the use of patented or copyrighted products or processes, whether specified or selected by the Contractor, in the Contract Price. B. Contractor's obligation to indemnify Owner for claims arising out of or related to infringement of patent rights and copyrights are as set forth in Paragraph 7.14. 7.06 Permits A. Obtain and pay for construction permits and licenses. OPT is to assist Contractor in obtaining permits and licenses when required to do so by applicable Laws and Regulations. Pay governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time the Contractor's Bid is submitted or when Contractor negotiates the Contract Price. This Project is not exempt from City permits and fees unless expressly stated otherwise. 7.07 Taxes A. Contractor is responsible for all taxes and duties arising out of the Work. The Owner generally qualifies as a tax exempt agency as defined by the statutes of the State of Texas and is usually not subject to any city or state sales or use taxes, however certain items such as rented equipment may be taxable even though Owner is a tax-exempt agency. Contractor is responsible for including in the Contract Price any applicable sales and use taxes and is responsible for complying with all applicable statutes and rulings of the State Comptroller. Pay sales, consumer, use, and other similar taxes required to be paid by Contractor in accordance with the Laws and Regulations. B. The Owner is exempt from the Federal Transportation and Excise Tax. Contractor must comply with all federal regulations governing the exemptions. C. Products incorporated into the Work are exempt from state sales tax according to the provisions of Subchapter H, Chapter 151, of the Texas Tax Code. D. Contractor may not include any amounts for sales, use, or similar taxes for which the Owner is exempt in the Contract Price or any proposed Change Order or Application for Payment. E. Obtain tax exemption certificates or other documentation necessary to establish Owner's exemption from such taxes. 7.08 Laws and Regulations A. Give required notices and comply with Laws and Regulations applicable to the performance of the Work. OPT is not responsible for monitoring Contractor's compliance with Laws or Regulations except where expressly required by applicable Laws and Regulations. B. Pay costs resulting from actions taken by Contractor that are contrary to Laws or Regulations. Contractor is not responsible for determining that the design aspects of the Work described in the Contract Documents is in accordance with Laws and Regulations. This does not relieve Contractor of its obligations under Paragraph 3.03. General Conditions 007200-41 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 C. Owner or Contractor may give notice to the other party of changes in Laws or Regulations that may affect the cost or time of performance of the Work, including: 1. Changes in Laws or Regulations affecting procurement of permits; and 2. Sales, use, value-added, consumption, and other similar taxes which come into effect after Contractor's Bid is submitted or when Contractor negotiates the Contract Price. D. Contractor may submit a Change Proposal or Owner may initiate a Claim within 30 days of this notice if Owner and Contractor are unable to agree on entitlement to or on the amount or extent of adjustments in Contract Price or Contract Times resulting from these changes. 7.09 Safety and Protection A. Contractor is solely responsible for initiating, maintaining,and supervising safety precautions and programs in connection with the Work. This responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. B. Take necessary precautions for the safety of persons on the Site or who may be affected by the Work, and provide the necessary protection to prevent damage, injury, or loss to: 1. Work and materials and equipment to be incorporated in the Work, whether stored on or off Site; and 2. Other property at or adjacent to the Site, including trees, shrubs, lawns, walks, pavements, roadways, structures, other work in progress, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. C. Comply with applicable Laws and Regulations relating to the safety and protection of persons or property. Erect and maintain necessary safeguards for safety and protection. Notify Owner; the owners of adjacent property, Underground Facilities, and other utilities; and other contractors and utility owners performing work at or adjacent to the Site when prosecution of the Work may affect them. Cooperate with them in the protection, removal, relocation, and replacement of their property or work in progress. 1. Comply with requirements of Underground Facility Damage Prevention and Safety Act, Texas Utilities Code Chapter 251. 2. Comply with all applicable safety rules and regulations of the Federal Occupational Health and Safety Act of 1970 and subsequent amendments (OSHA). D. Remedy damage, injury, or loss to property referred to in Paragraph 7.09.B caused by Contractor's Team. Pay remediation costs unless the damage or loss is: 1. Attributable to the fault of the Contract Documents; 2. Attributable to acts or omissions of OPT; or 3. Not attributable to the actions or failure to act of the Contractor's Team. E. Contractor's duties and responsibilities for safety and protection of persons or the Work or property at or adjacent to the Site continues until Work is completed and resumes whenever Contractor's Team returns to the Site to fulfill warranty or correction obligations or to conduct other tasks. General Conditions 007200-42 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 F. Comply with the applicable requirements of the Owner's safety program if required to do so in the Supplementary Conditions. A copy of the Owner's safety program will be provided in the Bidding Documents. 7.10 Safety Representative A. Provide a qualified and experienced safety representative at the Site whose duties and responsibilities are the prevention of accidents and maintaining and supervising safety programs. 7.11 Hazard Communication Programs A. Coordinate the exchange of material safety data sheets or other hazard communication information required to be made available or exchanged between or among employers at the Site in accordance with Laws or Regulations. 7.12 Emergencies A. Act to prevent threatened damage, injury or loss in emergencies affecting the safety or protection of persons or the Work or property at or adjacent to the Site. Notify OAR immediately if Contractor believes that significant changes in the Work or variations from the Contract Documents have been caused or are required as a result of this need to act. A Modification is to be issued by OAR if OPT determines that the incident giving rise to the emergency action was not the responsibility of the Contractor and that a change in the Contract Documents is required because of the action taken by Contractor in response to this emergency. 7.13 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to Owner that Work is in accordance with the Contract Documents and is not Defective. Owner is entitled to rely on Contractor's warranty and guarantee. Assume and bear responsibility for costs and time delays associated with variations from the requirements of the Contract Documents. B. This Contractor's warranty and guarantee excludes defects or damage caused by improper maintenance or operation, abuse, or modification by OPT; or normal wear and tear under normal usage. C. Contractor's obligation to perform and complete Work in accordance with the Contract Documents is absolute. None of the following constitute an acceptance of Defective Work or a release of Contractor's obligation to perform Work in accordance with the Contract Documents: 1. Observations by OPT; 2. Recommendation by OAR to pay or payment by Owner of progress or final payments; 3. The issuance of a Certificate of Substantial Completion; 4. Use or occupancy of part of the Work by Owner; 5. Review and approval of a Shop Drawing or Sample; 6. Inspections, tests, or approvals by others; or General Conditions 007200-43 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 7. Correction of Defective Work by Owner. D. The Contract Documents may require the Contractor to accept the assignment of a contract between the Owner and a contractor or supplier. The specific warranties, guarantees, and correction obligations contained in an assigned contract govern with respect to Contractor's performance obligations to Owner for the Work described in an assigned contract. 7.14 INDEMNIFICATION A. To the fullest extent permitted by law, Contractor shall indemnify, defend, and hold harmless the Owner from and against claims, damages, losses and expenses, including but not limited to attorney's fees or dispute resolution costs, arising out of or resulting from performance of the Work and/or failure to comply with the terms and conditions of the contract, violations of Laws or Regulations, or bodily injury, death or destruction of tangible property caused by the acts, omissions or negligence of the Contractor's Team, regardless of whether such claim, damage, loss or expense is alleged to be caused in part by an Owner hereunder, subject to the Owner's defenses and liability limits under the Texas Tort Claims Act. However, nothing herein shall be construed to require Contractor to indemnify an Owner against a claim, loss, damage or expense caused by the sole negligence of an Owner. B. To the fullest extent permitted by law, Contractor shall indemnify, defend, and hold harmless the Owner from and against Indemnified Costs, arising out of or relating to: (i) the failure to control, contain, or remove a Constituent of Concern brought to the Site by Contractor's Team or a Hazardous Environmental Condition created by Contractor's Team, (ii) Contractor's Team's action or inaction related to damages, delays, disruptions or interference with the work of Owner's employees, other contractors, or utility owners performing other work at or adjacent to the Site, or (iii) the correction of Defective Work. Nothing in this paragraph obligates the Contractor to indemnify the Owner from the consequences of the Owner's sole negligence. c. To the fullest extent permitted by law, Contractor shall indemnify, defend, and hold harmless the Owner from and against Indemnified Costs resulting from infringement on patent rights or copyrights by Contractor's Team. General Conditions 007200-44 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 D. The indemnification obligations of this Paragraph 7.14 are not limited by the amount or type of damages, compensation or benefits payable by or for members of the Contractor's Team or other individuals or entities under workers' compensation acts, disability benefit acts, or other employee benefit acts in claims against Owner by an employee or the survivor or personal representative of employee of Contractor's Team. The indemnification obligations of this Paragraph 7.14 shall not be deemed to be released,waived or modified in any respect by reason of any surety or insurance provided by Contractor. E. The indemnification obligations of this Paragraph 7.14 do not extend to the liability of Designer arising out of the preparation of the Contract Documents or giving directions or instructions, or failing to give them, to the extent they are obligated to do so if that is the primary cause of the injury or damage. F. Notify the other party within 10 days if Owner or Contractor receives notice of any claim or circumstances that could give rise to an indemnified loss. The notice must include the following: 1. A description of the indemnification event in reasonable detail; 2. The basis on which indemnification may be due; and 3. The anticipated amount of the indemnified loss. This notice does not stop or prevent Owner from later asserting a different basis for indemnification or a different amount of indemnified loss than that indicated in the initial notice. Owner does not waive any rights to indemnification except to the extent that Contractor is prejudiced, suffers loss, or incurs expense because of the delay if Owner does not provide this notice within the 10-day period. G. Defense of Indemnification Claims: 1. Assume the defense of the claim with counsel chosen by the Contractor and pay related costs, unless Owner decides otherwise. Contractor's counsel must be acceptable to Owner. Control the defense and any negotiations to settle the claim. Advise Owner as to its defense of the claim within 10 days after being notified of the indemnification request. Owner may assume and control the defense if Contractor does not assume the defense. Pay all defense expenses of the Owner as an indemnified loss. 2. Owner may retain separate counsel to participate in, but not control, the defense and any settlement negotiations if Contractor defends the claim. Contractor may not settle the claim without the consent or agreement of Owner. Contractor may settle the claim with Owner's consent and agreement unless it: a. Would result in injunctive relief or other equitable remedies or otherwise require Owner to comply with restrictions or limitations that adversely affect Owner; b. Would require Owner to pay amounts that Contractor does not fund in full; or c. Would not result in Owner's full and complete release from all liability to the plaintiffs or claimants who are parties to or otherwise bound by the settlement. 7.15 Delegation of Professional Design Services A. Contractor is not required to provide professional design services unless these services are specifically required by the Contract Documents for a portion of the Work or unless these General Conditions 007200-45 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences, and procedures. Contractor is not required to provide professional services in violation of applicable Laws and Regulations. B. The Contract Documents specify performance and design criteria related to systems, materials or equipment if professional design services or certifications by a design professional related to systems, materials, or equipment are specifically required of Contractor. These services or certifications must be provided by the licensed Texas Professional Engineer or Registered Architect who prepares, signs, and seals drawings, calculations, specifications, certifications, Shop Drawings, and other documents. C. OPT is entitled to rely upon the adequacy, accuracy, and completeness of the services, certifications, or approvals performed by Contractor's design professionals, provided OPT has specified to Contractor the performance and design criteria that these services must satisfy. D. Pursuant to this Paragraph 7.15, Designer's review and approval of design calculations and design drawings is only for the limited purpose of checking for conformance with the performance and design criteria given and the design concepts expressed in the Contract Documents. Designer's review and approval of Shop Drawings and other documents is only for the purpose stated in the Contract Documents. E. Contractor is not responsible for the adequacy of the performance or design criteria specified by OPT. Advise OPT if the performance or design criteria are known or considered likely to be inadequate or otherwise deficient. ARTICLE 8—OTHER WORK AT THE SITE 8.01 Other Work A. Owner may arrange for other work at or adjacent to the Site which is not part of the Contractor's Work. This other work may be performed by Owner's employees or through other contractors. Utility owners may perform work on their utilities and facilities at or adjacent to the Site. Include costs associated with coordinating with entities performing other work or associated with connecting to this other work in the Contract Price if this other work is shown in the Contract Documents. B. OPT is to notify Contractor of other work prior to starting the work and provide any knowledge they have regarding the start of utility work at or adjacent to the Site to Contractor. C. Provide other contractors: 1. Proper and safe access to the Site; 2. Reasonable opportunity for the introduction and storage of materials and equipment; and 3. Reasonable opportunity to execute their work. D. Provide cutting, fitting, and patching of the Work required to properly connect or integrate with other work. Do not endanger the work of others by cutting, excavating, or otherwise altering the work of others without the consent of OAR and the others whose work will be affected. General Conditions 007200-46 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 E. Inspect the work of others and immediately notify OAR if the proper execution of part of Contractor's Work depends upon work performed by others and this work has not been performed or is unsuitable for the proper execution of Contractor's Work. Contractor's failure to notify the OAR constitutes an acceptance of this other work as acceptable for integration with Contractor's Work. This acceptance does not apply to latent defects or deficiencies in the work of others. F. Take adequate measures to prevent damages, delays, disruptions, or interference with the work of Owner, other contractors, or utility owners performing other work at or adjacent to the Site. 8.02 Coordination A. Owner has sole authority and responsibility for coordination of this other work unless otherwise provided in the Contract Documents. The Owner is to identify the entity with authority and responsibility for coordination of the activities of the various contractors, the limitations of their authority, and the work to be coordinated prior to the start of other work at or adjacent to the Site. 8.03 Legal Relationships A. Contractor may be entitled to a change in Contract Price or Contract Times if, while performing other work at or adjacent to the Site for Owner, the OPT or other contractor retained by the City: 1. Damages the Work or property of Contractor's Team; 2. Delays, disrupts, or interferes with the execution of the Work; or 3. Increases the scope or cost of performing the Work through their actions or inaction. B. Notify the OAR immediately of the event leading to a potential Change Proposal so corrective action can be taken. Submit the Change Proposal within 30 days of the event if corrective action has not adequately mitigated the impact of the actions or inactions of others. Information regarding this other work in the Contract Documents is used to determine if the Contractor is entitled to a change in Contract Price or Contract Times. Changes in Contract Price require that Contractor assign rights against the other contractor to Owner with respect to the damage, delay, disruption, or interference that is the subject of the adjustment. Changes in Contract Times require that the time extension is essential to Contractor's ability to complete the Work within the Contract Times. C. Take prompt corrective action if Contractor's Team damages, delays, disrupts, or interferes with the work of Owner's employees, other contractors, or utility owners performing other work at or adjacent to the Site or agree to compensate other contractors or utility owners for correcting the damage. Promptly attempt to settle claims with other contractors or utility owners if Contractor damages, delays, disrupts, or interferes with the work of other contractors or utility owners performing other work at or adjacent to the Site. D. Owner may impose a set-off against payments due to Contractor and assign the Owner's contractual rights against Contractor with respect to the breach of the obligations described in this Paragraph 8.03 to other contractors if damages, delays, disruptions, or interference occur. General Conditions 007200-47 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 E. Contractor's obligation to indemnify Owner for claims arising out of or related to damages, delays, disruptions, and interference with other work at the Site are as set forth in Paragraph 7.14. ARTICLE 9—OWNER'S AND OPT'S RESPONSIBILITIES 9.01 Communications to Contractor A. OPT issues communications to Contractor through OAR except as otherwise provided in the Contract Documents. 9.02 Replacement of Owner's Project Team Members A. Owner may replace members of the OPT at its discretion. 9.03 Furnish Data A. OPT is to furnish the data required of OPT under the Contract Documents. 9.04 Pay When Due A. Owner is to make payments to Contractor when due as described in Article 17. 9.05 Lands and Easements; Reports and Tests A. Owner's duties with respect to providing lands and easements are described in Paragraph 5.01. OPT will make copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at the Site available to Contractor in accordance with Paragraph 5.03. 9.06 Insurance A. Owner's responsibilities with respect to purchasing and maintaining insurance are described in Article 6. 9.07 Modifications A. Owner's responsibilities with respect to Modifications are described in Article 11. 9.08 Inspections, Tests, and Approvals A. OPT's responsibility with respect to certain inspections,tests, and approvals are described in Paragraph 16.02. 9.09 Limitations on OPT's Responsibilities A. The OPT does not supervise, direct, or have control or authority over, and is not responsible for Contractor's means, methods, techniques, sequences, or procedures of construction, or related safety precautions and programs, or for failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. OPT is not responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. General Conditions 007200-48 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 9.10 Undisclosed Hazardous Environmental Condition A. OPT's responsibility for undisclosed Hazardous Environmental Conditions is described in Paragraph 5.06. 9.11 Compliance with Safety Program A. Contractor is to inform the OPT of its safety programs and OPT is to comply with the specific applicable requirements of this program. 9.12 Plans and Specifications A. Owner does not warrant the plans and specification. ARTICLE 10—OAR'S AND DESIGNER'S STATUS DURING CONSTRUCTION 10.01 Owner's Representative A. OAR is Owner's representative. The duties and responsibilities and the limitations of authority of OAR as Owner's representative are described in the Contract Documents. 10.02 Visits to Site A. Designer is to make periodic visits to the Site to observe the progress and quality of the Work. Designer is to determine, in general, if the Work is proceeding in accordance with the Contract Documents based on observations made during these visits. Designer is not required to make exhaustive or continuous inspections to check the quality or quantity of the Work. Designer is to inform the OPT of issues or concerns and OAR is to work with Contractor to address these issues or concerns. Designer's visits and observations are subject to the limitations on Designer's authority and responsibility described in Paragraphs 9.09 and 10.07. B. OAR is to observe the Work to check the quality and quantity of Work, implement Owner's quality assurance program, and administer the Contract as Owner's representative as described in the Contract Documents. OAR's visits and observations are subject to the limitations on OAR's authority and responsibility described in Paragraphs 9.09 and 10.07. 10.03 Resident Project Representatives A. Resident Project Representatives assist OAR in observing the progress and quality of the Work at the Site. The limitations on Resident Project Representatives' authority and responsibility are described in Paragraphs 9.09 and 10.07. 10.04 Rejecting Defective Work A. OPT has the authority to reject Work in accordance with Article 16. OAR is to issue a Defective Work Notice to Contractor and document when Defective Work has been corrected or accepted in accordance with Article 16. General Conditions 007200-49 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 10.05 Shop Drawings, Modifications and Payments A. Designer's authority related to Shop Drawings and Samples are described in the Contract Documents. B. Designer's authority related to design calculations and design drawings submitted in response to a delegation of professional design services are described in Paragraph 7.15. C. OAR and Designer's authority related to Modifications is described in Article 11. D. OAR's authority related to Applications for Payment is described in Articles 15 and 17. 10.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. OAR is to render decisions regarding non-technical or contractual / administrative requirements of the Contract Documents and will coordinate the response of the OPT to Contractor. B. Designer is to render decisions regarding the conformance of the Work to the requirements of the Contract Documents. Designer will render a decision to either correct the Defective Work or accept the Work under the provisions of Paragraph 16.04 if Work does not conform to the Contract Documents. OAR will coordinate the response of the OPT to Contractor. C. Contractor may appeal Designer's decision by submitting a Change Proposal if Contractor does not agree with the Designer's decision. 10.07 Limitations on OAR's and Designer's Authority and Responsibilities A. OPT is not responsible for the acts or omissions of Contractor's Team. No actions or failure to act, or decisions made in good faith to exercise or not exercise the authority or responsibility available under the Contract Documents creates a duty in contract, tort, or otherwise of the OPT to the Contractor or members of the Contractor's Team. ARTICLE 11—AMENDING THE CONTRACT DOCUMENTS; CHANGES IN THE WORK 11.01 Amending and Supplementing the Contract Documents A. The Contract Documents may be modified by a Contract Amendment, Change Order, Work Change Directive, or Field Order. 1. Contract Amendment: Owner and Contractor may modify the terms and conditions of the Contract Documents without the recommendation of the Designer using a Contract Amendment. A Contract Amendment may be used for: a. Changes that do not involve: 1) The performance or acceptability of the Work; 2) The design as described in the Drawings, Specifications, or otherwise; or 3) Other engineering, architectural or technical matters. b. Authorizing new phases of the Work and establishing the Contract Price, Contract Times, or terms and conditions of the Contract for the new phase of Work when using phased construction or purchasing Goods and Special Services to be incorporated into the Project. General Conditions 007200-50 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 2. Change Order: All changes to the Contract Documents that include a change in the Contract Price or the Contract Times for previously authorized Work, or changes to the Work requiring Designer's approval must be made by a Change Order. A Change Order may also be used to establish modifications of the Contract Documents that do not affect the Contract Price or Contract Times. 3. Work Change Directive: A Work Change Directive does not change the Contract Price or the Contract Times, but is evidence that the parties expect that the modifications ordered or documented by a Work Change Directive will be incorporated in a subsequently issued Change Order following negotiations on the Contract Price and Contract Times. If negotiations under the terms of the Contract Documents governing adjustments, expressly including Paragraphs 11.04 and 11.05 are unsuccessful, Contractor must submit a Change Proposal seeking an adjustment of the Contract Price or the Contract Times no later than 30 days after the completion of the Work set out in the Work Change Directive. 4. Field Order: Designer may require minor changes in the Work that do not change the Contract Price or Contract Times using a Field Order. OAR may issue a Field Order for non-technical, administrative issues. Submit a Change Proposal if Contractor believes that a Field Order justifies an adjustment in the Contract Price or Contract Times before proceeding with the Work described in the Field Order. B. Perform added or revised Work under the applicable provisions of the Contract Documents for the same or similar Work unless different Drawings, Specifications or directions are provided in the Modification. 11.02 Owner-Authorized Changes in the Work A. Owner may order additions, deletions,or revisions in the Work at any time as recommended by the Designer to the extent the change: 1. Involves the design as described in the Contract Documents; 2. Involves acceptance of the Work; or 3. Involves other engineering, architectural or technical matters. B. These changes may be authorized by a Modification. Proceed with the Work involved or, in the case of a deletion in the Work, immediately cease construction activities with respect to the deleted Work upon receipt of the Modification. Nothing in this paragraph obligates the Contractor to undertake Work that Contractor reasonably concludes cannot be performed in a manner consistent with Contractor's safety obligations under the Contract Documents or Laws and Regulations. 11.03 Unauthorized Changes in the Work A. Contractor is not entitled to an increase in the Contract Price or an extension of the Contract Times with respect to Work performed that is not required by the Contract Documents, except in the case of an emergency as provided in Paragraph 7.12, or in the case of uncovering Work as provided in Paragraph 16.05. General Conditions 007200-51 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 B. Contractor is responsible for costs and time delays associated with variations from the requirements of the Contract Documents unless the variations are specifically approved by Change Order. 11.04 Change of Contract Price A. The Contract Price for authorized Work can only be changed by a Change Order. Any Change Proposal for an adjustment in the Contract Price must comply with the provisions of Paragraph 11.06. Any Claim for an adjustment of Contract Price must comply with the provisions of Article 13. B. An adjustment in the Contract Price is to be determined as follows: 1. By applying unit prices to the quantities of the items involved, subject to the provisions of Paragraph 15.03, where the Work involved is covered by unit prices in the Contract Documents; 2. By a mutually agreed lump sum where the Work involved is not covered by unit prices in the Contract Documents; or 3. Payment on the basis of the Cost of the Work determined as provided in Paragraph 15.01 plus a Contractor's fee for overhead and profit determined as provided in Paragraph 15.05 when the Work involved is not covered by unit prices in the Contract Documents and the parties do not reach a mutual agreement to a lump sum. C. The original Contract Price may not be increased by more than 25 percent or the limit set out in Texas Local Government Code 252.048 or its successor statute, whichever is greater. Owner may decrease the Work by up to 25 percent of the Contract Price. 11.05 Change of Contract Times A. The Contract Times for authorized Work can only be changed by Change Order. Any Change Proposal for an adjustment in the Contract Times must comply with the provisions of Paragraph 11.06. Any Claim for an adjustment in the Contract Times must comply with the provisions of Article 13. B. An adjustment of the Contract Times is subject to the limitations described in Paragraph 4.04. 11.06 Change Proposals A. Submit a Change Proposal in accordance with Article 12 to the OAR to: 1. Request an adjustment in the Contract Price or Contract Times; 2. Appeal an initial decision by OPT concerning the requirements of the Contract Documents or relating to the acceptability of the Work under the Contract Documents; 3. Contest a set-off against payment due; or 4. Seek other relief under the Contract Documents. General Conditions 007200-52 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 B. Notify the OAR within 3 days if a Change Proposal is to be submitted. Submit each Change Proposal to OAR no later than 30 days after the event initiating the Change Proposal. 11.07 Execution of Change Orders A. Owner and Contractor are to execute Change Orders covering: 1. Changes in the Contract Price or Contract Times, which are agreed to by Owner and Contractor, including undisputed sums or amount of time for Work actually performed in accordance with a Work Change Directive; 2. Changes in Contract Price resulting from Owner set-offs unless the set-off has been successfully challenged by Contractor; 3. Changes in the Work which are: a. Ordered by Owner pursuant to Paragraph 11.02.A, b. Required because Defective Work was accepted under Paragraph 16.04 or Owner's correction of Defective Work under Paragraph 16.07, or c. Agreed to by the Owner and Contractor; and 4. Changes in the Contract Price or Contract Times, or other changes under Paragraph 11.06 or Article 13. B. Acceptance of a Change Order by Contractor constitutes a full accord and satisfaction for any and all claims and costs of any kind, whether direct or indirect, including but not limited to impact, delay or acceleration damages arising from the subject matter of the Change Order. Each Change Order must be specific and final as to prices and extensions of time, with no reservations or other provisions allowing for future additional money or time as a result of the particular changes identified and fully compensated in the Change Order. The execution of a Change Order by Contractor constitutes conclusive evidence of Contractor's agreement to the ordered changes in the Work. This Contract, as amended, forever releases any claim against Owner for additional time or compensation for matters relating to or arising out of or resulting from the Work included within or affected by the executed Change Order. This release applies to claims related to the cumulative impact of all Change Orders and to any claim related to the effect of a change on unchanged Work. C. All Change Orders require approval by either the City Council or Owner by administrative action. The approval process requires a minimum of 45 days after submission in final form with all supporting data. Receipt of Contractor's submission by Owner constitutes neither acceptance nor approval of a Change Order, nor a warranty that the Change Order will be authorized by City Council or administrative action. The time required for the approval process may not be considered a delay and no extensions to the Contract Times or increase in the Contract Price will be considered or granted as a result of the process. Contractor may proceed with Work if a Work Change Directive is issued. D. If the Contractor refuses to execute a Change Order that is required to be executed under the terms of this Paragraph 11.07, the Change Order is deemed to be in full force as if executed by Contractor. Contractor may file a Claim for payment and/or time, pursuant to Article 13. General Conditions 007200-53 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 11.08 Notice to Surety A. Notify the surety of Modifications affecting the general scope of the Work, changes in the provisions of the Contract Documents,or changes in Contract Price or Contract Times. Adjust the amount of each Bond when Modifications change the Contract Price. ARTICLE 12—CHANGE MANAGEMENT 12.01 Requests for Change Proposal A. Designer will initiate Modifications by issuing a Request for a Change Proposal (RCP). 1. Designer will prepare a description of proposed Modifications. 2. Designer will issue the Request for a Change Proposal form to Contractor. A number will be assigned to the Request for a Change Proposal when issued. 3. Return a Change Proposal in accordance with Paragraph 12.02 to the Designer for evaluation by the OPT. 12.02 Change Proposals A. Submit a Change Proposal (CP) to the Designer for Contractor initiated changes in the Contract Documents or in response to a Request for Change Proposal. A Change Proposal must be submitted to the OAR no later than 30 days after the event initiating the Change Proposal. 1. Use the Change Proposal form provided. 2. Assign a number to the Change Proposal when issued. 3. Include with the Change Proposal: a. A complete description of the proposed Modification if Contractor initiated or proposed changes to the OPT's description of the proposed Modification. b. The reason the Modification is requested, if not in response to a Request for a Change Proposal. c. A detailed breakdown of the cost of the change if the Modification requires a change in Contract Price. The itemized breakdown is to include: 1) List of materials and equipment to be installed; 2) Man hours for classification; 3) Equipment used in construction; 4) Consumable supplies, fuels, and materials; 5) Royalties and patent fees; 6) Bonds and insurance; 7) Overhead and profit; 8) Field office costs; and 9) Other items of cost. General Conditions 007200-54 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 d. Provide the level of detail outlined in the paragraph above for each Subcontractor or Supplier actually performing the Work if Work is to be provided by a Subcontractor or Supplier. Indicate appropriate Contractor mark-ups for Work provided through Subcontractors and Suppliers. Provide the level of detail outline in the paragraph above for self-performed Work. e. Submit Change Proposals that comply with Article 15 for Cost of Work. f. Provide a revised schedule. Show the effect of the change on the Project Schedule and the Contract Times. B. Submit a Change Proposal to the OAR to request a Field Order. C. A Change Proposal is required for all substitutions or deviations from the Contract Documents. D. Request changes to products in accordance with Article 25. 12.03 Designer Will Evaluate Request for Modification A. OAR is to advise OPT regarding the Change Proposal. OPT is to review each Change Proposal and Contractor's supporting data, and within 30 days after receipt of the documents, direct the OAR to either approve or deny the Change Proposal in whole or in part. OAR is to issue a Change Order for an approved Change Proposal. The Contractor may deem the Change Proposal to be denied if OAR does not take action on the Change Proposal within 30 days and start the time for appeal of the denial under Article 13. 1. Change Orders and Contract Amendments will be sent to the Contractor for execution with a copy to the Owner recommending approval. A Work Change Directive may be issued if Work needs to progress before the Change Order or Contract Amendment can be authorized by the Owner. 2. Work Change Directives, Change Orders, and Contract Amendments can only be approved by the Owner. a. Work performed on the Change Proposal prior to receiving a Work Change Directive or approval of the Change Order or Contract Amendment is performed at the Contractor's risk. b. No payment will be made for Work on Change Orders or Contract Amendments until approved by the Owner. B. The Contractor may be informed that the Request for a Change Proposal is not approved and construction is to proceed in accordance with the Contract Documents. 12.04 Substitutions A. The products of the listed Suppliers are to be furnished where Specifications list several manufacturers but do not specifically list "or equal" or "or approved equal" products. Use of any products other than those specifically listed is a substitution. Follow these procedures for a substitution. B. Substitutions are defined as any product that the Contractor proposes to provide for the Project in lieu of the specified product. Submit a Change Proposal per Paragraph 12.02 along with a Shop Drawing as required by Article 25 to request approval of a substitution. General Conditions 007200-55 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 C. Prove that the product is acceptable as a substitute. It is not the Designer's responsibility to prove the product is not acceptable as a substitute. 1. Indicate on a point by point basis for each specified feature that the product is acceptable to meet the intent of the Contract Documents requirements. 2. Make a direct comparison with the specified Suppliers published data sheets and available information. Provide this printed material with the documents submitted. 3. The decision of the Designer regarding the acceptability of the proposed substitute product is final. D. Provide a written certification that, in making the substitution request,the Contractor: 1. Has determined that the substituted product will perform in substantially the same manner and result in the same ability to meet the specified performance as the specified product. 2. Will provide the same warranties and/or bonds for the substituted product as specified or as would be provided by the manufacturer of the specified product. 3. Will assume all responsibility to coordinate any modifications that may be necessary to incorporate the substituted product into the Project and will waive all claims for additional Work which may be necessary to incorporate the substituted product into the Project which may subsequently become apparent. 4. Will maintain the same time schedule as for the specified product. E. Pay for review of substitutions in accordance with Article 25. ARTICLE 13—CLAIMS 13.01 Claims A. Follow the Claims process described in this Article for the following disputes between Owner and Contractor: 1. Seeking an adjustment of Contract Price or Contract Times; 2. Contesting an initial decision by OAR concerning the requirements of the Contract Documents or the acceptability of Work under the Contract Documents; 3. Appealing OAR's decision regarding a Change Proposal; 4. Seeking resolution of a contractual issue that OAR has declined to address; or 5. Seeking other relief with respect to the terms of the Contract. B. Contractor shall be entitled to an extension of Contract Time for delays or disruptions due to unusually severe weather in excess of weather normally experienced at the job site, as determined from climatological data set forth by the National Weather Service and which affects the Project's critical path. Contractor shall bear the entire economic risk of all weather delays and disruptions. Contractor shall not be entitled to any increase in the Contract Price by reason of such delays or disruptions. Upon Contractor reaching Substantial Completion, Owner and Contractor shall look back at the entire duration of the calendar day Project and review the totality of what Contractor claims were unusually severe weather disruptions. If the Project was delayed or disrupted due to unusually severe weather in General Conditions 007200-56 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 excess of weather normally experienced over the entire duration of the Project, Contractor may make a Claim for an extension of the Contract Time for delays or disruptions due to unusually severe weather in excess of weather normally experienced at the job site, as determined from climatological data set forth by the National Weather Service and which affects the Project's critical path. Anytime extension granted shall be non-compensatory. 13.02 Claims Process A. Claims must be initiated by written notice. Notice must conspicuously state that it is a notice of a Claim in the subject line or first sentence. Notice must also list the date of first occurrence of the claimed event. B. Except for Claims resulting from unusually severe weather, notice of a Claim by Contractor must be in writing and delivered to the Owner, Designer and the OAR within 14 days after the start of the event giving rise to the Claim. Failure by Contractor to submit written notice of a Claim within 14 days shall constitute a waiver of such Claim. C. Submit the complete Claim with supporting documentation to Owner no later than 60 days after the start of the event giving rise to the Claim (unless Designer allows additional time for claimant to submit additional or more accurate data in support of such Claim). The Claim must be signed and sworn to by Contractor, certifying that the Claim is made in good faith, that the supporting data is accurate and complete, and that to the best of Contractor's knowledge and belief,the relief requested accurately reflects the full compensation to which Contractor is entitled. Failure by Contractor to submit the Claim within 60 days shall constitute a waiver of such Claim. D. Any Claims by Contractor that are not brought within 90 days following the termination of the Contract are waived and shall be automatically deemed denied. E. Claims by Owner must be submitted by written notice to Contractor. F. The responsibility to substantiate a Claim rests with the entity making the Claim. Claims must contain sufficient detail to allow the other party to fully review the Claim. 1. Claims seeking an adjustment of Contract Price must include the Contractor's job cost report. Provide additional documentation as requested by OAR or Designer. 2. Claims seeking an adjustment of Contract Time must include a Time Impact Analysis and native schedule files in Primavera or MS Project digital format. Provide additional documentation as requested by OAR or Designer. G. Claims by Contractor against Owner and Claims by Owner against Contractor, including those alleging an error or omission by Designer but excluding those arising under Section 7.12,shall be referred initially to Designer for consideration and recommendation. H. Designer will review a Claim by Contractor within 30 days of receipt of the Claim and take one or more of the following actions: 1. Request additional supporting data from the party who made the Claim; 2. Issue a recommendation; 3. Suggest a compromise; or General Conditions 007200-57 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 4. Advise the parties that Designer is not able to make a recommendation due to insufficient information or a conflict of interest. I. If the Designer does not take any action, the Claim shall be deemed denied 30 days after receipt of the Claim. J. Following receipt of Designer's initial recommendation regarding a Claim,the Contractor and the Owner shall seek to resolve the Claim through the exchange of information and direct negotiations. If no agreement is reached within 90 days, the Claim shall be deemed denied. The Owner and Contractor may extend the time for resolving the Claim by mutual agreement. Notify OAR of any actions taken on a Claim. K. If the entity receiving a Claim approves the Claim in whole or in part or denies it in whole or in part, this action is final and binding unless the other entity invokes the procedure described in Article 22 for final resolution of disputes by filing a notice of appeal within 30 days after this action. L. If the Owner and Contractor reach a mutual agreement regarding a Claim, the results of the agreement or action on the Claim will be incorporated in a Change Order by the OAR to the extent they affect the Contract Documents, the Contract Price, or the Contract Times. M. Both parties shall continue to perform all obligations under the Agreement during the pendency of any dispute or disagreement relating to this Agreement, unless performance would be impracticable or impossible under the circumstances. N. Any failure of Contractor to comply with any of the foregoing conditions precedent with regard to any such Claim shall constitute a waiver of any entitlement to submit or pursue such Claim. O. Receipt and review of a Claim by City shall not be construed as a waiver of any defenses to the Claim available to the City under the Contract Documents or at law. ARTICLE 14—PREVAILING WAGE RATE REQUIREMENTS 14.01 Payment of Prevailing Wage Rates A. Contractor and any Subcontractors employed on this Project shall pay not less than the rates established by the Owner as required by Texas Government Code Chapter 2258. B. Contractor and its Subcontractors are required to pay Davis-Bacon Wage Rates. C. Contractor and its Subcontractors are required to pay laborers and mechanics an overtime rate of not less than one and one-half times the basic rate for all hours worked in excess of forty hours in a given workweek. 14.02 Records A. In accordance with Tex. Gov't Code §2258.024,the Contractor and its Subcontractors, if any, shall keep a record showing: 1. The name and occupation of each worker employed by the Contractor or Subcontractor in the construction of the Work; and 2. The actual per diem wages paid to each worker. General Conditions 007200-58 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 B. The record shall be open at all reasonable hours to inspection by the officers and agents of the Owner. 14.03 Liability; Penalty; Criminal Offense A. Tex. Gov't Code §2258.003 — Liability: An officer, agent, or employee of the Owner is not liable in a civil action for any act or omission implementing or enforcing Chapter 2258 unless the action was made in bad faith. B. Tex. Gov't Code §2258.023(b) — Penalty: Any Contractor or Subcontractor who violates the requirements of Chapter 2258,shall pay to the Owner,on whose behalf the Contract is made, $60 for each worker employed on each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the Contract. C. Tex. Gov't Code §2258.058—Criminal Offense: 1. An officer, agent, or representative of the Owner commits an offense if the person willfully violates or does not comply with a provision of Chapter 2258. 2. Any Contractor or Subcontractor, or an agent or representative of the Contractor or Subcontractor, commits an offense if the person violates Tex. Gov't Code §2258.024. 3. An offense is punishable by: a. A fine not to exceed $500; b. Confinement in jail for a term not to exceed 6 months; or C. Both a fine and confinement. 14.04 Prevailing Wage Rates A. Use the Prevailing Wage Rates specified in the Supplementary Conditions. ARTICLE 15—COST OF THE WORK;ALLOWANCES; UNIT PRICE WORK 15.01 Cost of the Work A. The Cost of the Work is the sum of costs described in this Paragraph 15.01, except those excluded in Paragraph 15.01.D, necessary for the proper performance of the Work. The provisions of this Paragraph 15.01 are used for two distinct purposes: 1. To determine Cost of the Work when Cost of the Work is a component of the Contract Price under cost-plus, time-and-materials, or other cost-based terms; or 2. To determine the value of a Change Order, Change Proposal, Claim, set-off, or other adjustment in Contract Price. B. Contractor is entitled only to those additional or incremental costs required because of the change in the Work or because of the event giving rise to the adjustment when the value of the adjustment is determined on the basis of the Cost of the Work. General Conditions 007200-59 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 C. Costs included in the Cost of the Work may not exceed the prevailing costs in the proximate area of the Site for similar work unless agreed to by the Owner. Cost of the Work includes only the following items: 1. Payroll costs for Contractor's employees performing the Work, including one foreman per crew, and other required and agreed upon personnel for the time they are employed on the Work. Employees are to be paid according to wage rates for job classifications as agreed to by Owner. Where the Cost of the Work is being used under provisions of Paragraph 15.01.A.2, rates paid for this Work are to be the same as paid for Contract Work as established by certified payroll. Payroll costs may include: a. Actual costs paid for salaries and wages; b. Actual cost paid for fringe benefits, which may include: 1) Social security contributions, 2) Unemployment, 3) Excise and payroll taxes, 4) Workers' compensation, 5) Health and retirement benefits, 6) Bonuses, and 7) Paid time off for sick leave, vacations, and holidays; and c. Actual cost of additional compensation paid for performing Work outside of regular working hours, on Sunday or legal holidays, to the extent authorized by Owner. 2. Cost of materials and equipment furnished and incorporated in the Work, including transportation and storage costs and required Suppliers'field services. Contractor may retain cash discounts unless Owner provided funds to the Contractor for early payment of these materials and equipment. Cash discounts are to be credited to Owner if the Owner provides funds for early payment. Make provisions for trade discounts, rebates, refunds, and returns from sale of surplus materials and equipment and reduce the Cost of the Work by these amounts. 3. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. Obtain competitive bids from Subcontractors acceptable to Owner unless Owner agrees to use Subcontractors proposed by the Contractor. Bids are to be opened in the presence of the OAR and other designated members for the OPT. Provide copies of bids to the OAR to use in determining,with the OPT,which bids are acceptable. The Subcontractor's Cost of the Work and fee are determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 15.01 if the subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee. 4. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work; b. Costs of materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site including transportation and maintenance costs; General Conditions 007200-60 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 c. Costs of hand tools not owned by the workers consumed in the performance of the Work. Costs of hand tools not owned by the workers which are used but not consumed in the performance of the Work and which remain the property of Contractor, less their market value when Work is completed; d. For Contractor-and Subcontractor-owned machinery,trucks, power tools or other equipment, use the FHWA rental rates found in the Rental Rate Blue Book ("Blue Book") multiplied by the regional adjustment factor and the rate adjustment factor to establish hourly rates. Use the rates in effect for each section of the Blue Book at the time of use. Payment will be made for the actual hours used in the Work. 1) Standby costs will be paid at 50% of the FHWA rental rates found in the Blue Book if Contractor is directed by Owner in writing to standby. Standby costs will not be allowed during periods when the equipment would otherwise have been idle. For a six-day work week, no more than eight hours per a 24-hour day, no more than 48 hours per week and no more than 208 hours per month shall be paid of standby time. Operating costs shall not be charged by Contractor. e. Rental of construction equipment, including the costs of transporting, loading, unloading, assembling, dismantling, and removing construction equipment, whether rented from Contractor or others, in accordance with rental agreements approved by Owner. Costs for rental of equipment will not be paid when the equipment is no longer necessary for the Work. Justify idle time for equipment by demonstrating that it was necessary to keep equipment on Site for related future Work; 1) The hourly rate shall be determined by dividing the actual invoice cost by the actual number of hours the equipment is involved in the Work. Owner reserves the right to limit the hourly rate to comparable Blue Book rates. 2) If Contractor is directed to standby in writing by Owner, standby costs will be paid at the invoice daily rate excluding operating costs, which includes fuel, lubricants, repairs and servicing. f. Applicable sales, consumer, use, and other similar taxes related to the Work for which the Owner is not exempt, and which Contractor pays consistent with Laws and Regulations; g. Deposits lost for causes other than negligence of Contractor's Team; h. Royalty payments and fees for permits and licenses; i. Cost of additional utilities, fuel, and sanitary facilities at the Site; j. Minor expense items directly required by the Work; and k. Premiums for Bonds and insurance required by the Contract Documents. D. The Cost of the Work does not include the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals of partnerships and sole proprietorships, general managers, safety managers, superintendents, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, clerks, and other personnel employed General Conditions 007200-61 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 by Contractor, whether at the Site or in Contractor's principal or branch office, for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 15.01.C.1 or specifically covered by Paragraph 15.01.C.4. These administrative costs are covered by the Contractor's fee. 2. Office expenses other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the actions of Contractor's Team for the correction of Defective Work, disposal of materials or equipment that do not comply with Specifications, and correcting damage to property. 5. Losses, damages, and related expenses caused by damage to the Work or sustained by Contractor in connection with the performance of the Work. Contractor is entitled to recover costs if covered by insurance provided in accordance with Article 6. Such losses may include settlements made with the approval of Owner. Do not include these losses, damages, and expenses in the Cost of the Work when determining Contractor's fee. 6. Any Indemnified Cost paid with regard to Contractor's indemnification of Owner. 7. Other overhead or general expense costs and the costs of items not described in Paragraphs 15.01.C. E. The Contractor's fee for profit and overhead is determined as follows: 1. In accordance with the Agreement when the Work is performed on a cost-plus basis; 2. A mutually acceptable fixed fee; or 3. A fee based on the following percentages of the various portions of the Cost of the Work: a. The Contractor's fee is 15 percent for costs incurred under Paragraphs 15.01.C.1, 15.01.C.2 and 15.01.C.4; b. The Contractor's fee is 5 percent for costs incurred under Paragraph 15.01.C.3; C. Fees are to be determined as follows where one or more tiers of subcontracts are used: 1) The Subcontractor's fee is 15 percent for costs incurred under Paragraphs 15.01.C.1 and 15.01.C.2 for the Subcontractor that actually performs the Work at whatever tier; 2) The Subcontractor's fee is 5 percent for costs incurred under Paragraph 15.01.C.4 for the Subcontractor that actually performs the Work at whatever tier; and 3) The Contractor and Subcontractors of a tier higher than that of the Subcontractor that actually performs the Work are to be allowed a fee of 5 percent of the fee plus underlying costs incurred by the next lower tier Subcontractor. d. No fee is payable on the basis of costs itemized under Paragraph 15.01.D; General Conditions 007200-62 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 e. Five percent of the net decrease in the cost is to be deducted for changes which result in a net decrease in Contract Price; and 4. The adjustment in Contractor's fee is based on the net change in accordance with Paragraphs 15.05.13.1 through 15.05.13.5, inclusive when both additions and credits are involved in any one change. F. Establish and maintain records in accordance with generally accepted accounting practices and submit these records, including an itemized cost breakdown together with supporting data, in a form and at intervals acceptable to OAR whenever the Cost of the Work is to be determined pursuant to this Paragraph 15.01. 15.02 Allowances A. Include allowances specified in the Contract Documents in the Contract Price and provide Work covered by the allowance as authorized by the Owner through the OAR. B. Contractor agrees that: 1. The cash allowance is used to compensate the Contractor for the cost of furnishing materials and equipment for the Work covered by the allowance item in the Contract Documents. Cost may include applicable taxes. Make provisions for trade discounts, rebates, and refunds and reduce the allowance costs by these amounts. 2. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the cash allowances have been included in the Contract Price and not in the allowances; and 3. Costs for cash allowances and installation costs as described in Paragraphs 15.02.13.1 and 15.02.13.2 above are included in the Contract Price. C. OAR will issue a Change Order to adjust the Contract Price by the difference between the allowance amount and the actual amount paid by Contractor for Work covered by the allowance. The Change Order will be issued at the time costs are incurred by Contractor for Work covered by the allowance and this Work is included on the Application for Payment. 15.03 Unit Price Work A. The initial Contract Price for Unit Price Work is equal to the sum of the unit price line items in the Agreement. Each unit price line item amount is equal to the product of the unit price for each line item times the estimated quantity of each item as indicated in the Contract. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparing Bids and determining an initial Contract Price. Payments to Contractor for Unit Price Work are to be based on actual quantities measured for Work in place. C. Each unit price is deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. D. OAR is to determine the actual quantities and classifications of Unit Price Work performed by Contractor to be incorporated into each Application for Payment. OAR's decision on actual quantities is final and binding, subject to the provisions of Paragraph 15.03.E. General Conditions 007200-63 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 E. Contractor may submit a Change Proposal,or Owner may file a Claim,seeking an adjustment in the Contract Price within 30 days of OAR's decision under Paragraph 15.03.D, if: 1. The total cost of a particular item of Unit Price Work amounts to 20 percent or more of the total Contract Price and the variation in the quantity of that particular item of Unit Price Work performed by the Contractor differs by more than 20 percent from the estimated quantity of an item indicated in the Contract; 2. There is no corresponding adjustment with respect to other items of Work; and 3. Contractor believes it has incurred additional expense as a result of this condition or Owner believes that the quantity variation entitles Owner to an adjustment in the Contract Price. 15.04 Contingencies A. Contingency funds may be included in the Contract Price to pay for Work not defined specifically by the Contract Documents that is essential to the completion of the Project. Contingency funds will be as described in the Contract. B. The contingency funds may be used for costs incurred by the Contractor provided these costs are approved by the Owner. Costs are to be determined and documented in accordance with Paragraph 15.01. The contingency funds are not to be used for the following items: 1. Cost overruns due to changes in material costs after the Contract Price is established, unless specific price escalation provisions are made in the Contract. 2. Rework required to correct Defective Work. 3. Inefficiencies in completing the Work due to the Contractor's selected means, methods, sequences, or procedures of construction. 4. Work Contractor failed to include in the Contract Price. 5. Changes required by changes in Laws and Regulations enacted after the Contract Price is established. 6. Any Work that does not constitute a change in Scope in the Work included in the Contract Price. C. OAR is to issue a Change Order for approved expenditures from contingency funds. When the Change Order is issued, the costs are to be added to the Application for Payment. Contractor is to maintain a tabulation showing the contingency amount, adjustments to the contingency amount, and amounts remaining as the Project progresses. D. Any contingency amounts that are not included in a Change Order are retained by the Owner. A Change Order will be issued to deduct unused contingency amounts from the Contract Price prior to Final Payment. General Conditions 007200-64 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 ARTICLE 16—TESTS AND INSPECTIONS;CORRECTION,REMOVAL,OR ACCEPTANCE OF DEFECTIVE WORK 16.01 Access to Work A. Provide safe access to the Site and the Work for the observation, inspection, and testing of the Work in progress. Contractor can require compliance with Contractor's safety procedures and programs as part of providing safe access. 16.02 Tests, Inspections and Approvals A. OPT may retain and pay for the services of an independent inspector, testing laboratory, or other qualified individual or entity to perform inspections. Notify OAR when the Work is ready for required inspections and tests. Provide adequate notice to allow for coordination with entities providing inspection or testing as determined by the OAR. Cooperate with inspection and testing personnel and assist with providing access for required inspections, tests, and handling test specimens or Samples. B. Arrange for and facilitate inspections, tests, and approvals required by Laws or Regulations of governmental entities having jurisdiction that require Work to be inspected, tested, or approved by an employee or other representative of that entity. Pay associated costs and furnish OAR with the required certificates of inspection or approval. C. Arrange, obtain, and pay for inspections and tests required: 1. By the Contract Documents, unless the Contract Documents expressly allocate responsibility for a specific inspection or test to OPT; 2. To attain OPT's acceptance of materials or equipment to be incorporated in the Work; 3. By manufacturers of equipment furnished under the Contract Documents; 4. For testing, adjusting, and balancing of mechanical, electrical, and other equipment to be incorporated into the Work; 5. For acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work,- 6. ork;6. For re-inspecting or retesting Defective Work, including any associated costs incurred by the testing laboratory for cancelled tests or standby time; and 7. For retesting due to failed tests. D. Provide independent inspectors, testing laboratories, or other qualified individuals or entities acceptable to OPT to provide these inspections and tests. 16.03 Defective Work A. It is Contractor's obligation to ensure that the Work is not Defective. B. OPT has the authority to determine whether Work is Defective and to reject Defective Work. C. OAR is to notify Contractor of Defective Work of which OPT has actual knowledge. D. Promptly correct Defective Work. E. Take no action that would void or otherwise impair Owner's special warranties or guarantees when correcting Defective Work. General Conditions 007200-65 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 F. Pay claims, costs, losses, and damages arising out of or relating to Defective Work, including: 1. Costs for correction, removal, and replacement of Defective Work; 2. Cost of the inspection and testing related to correction of Defective Work; 3. Fines levied against Owner by governmental authorities because of Defective Work;and 4. Costs of repair or replacement of work of others resulting from Defective Work. 16.04 Acceptance of Defective Work A. Owner may elect to accept Defective Work instead of requiring correction or removal and replacement of Defective Work provided: 1. This acceptance occurs prior to final payment; 2. Designer confirms that the Defective Work is in general accordance with the design intent and applicable engineering or architectural principles; and 3. Designer confirms that acceptance of the Defective Work does not endanger public health or safety. B. Owner may impose a reasonable set-off against payments due under Article 17 for costs associated with OPT's evaluation of Defective Work to determine if it can be accepted and to determine the diminished value of the Work. Owner may impose a reasonable set-off against payments due under Article 17 if the parties are unable to agree as to the decrease in the Contract Price to compensate Owner for the diminished value of Defective Work accepted. OAR is to issue a Modification for acceptance of the Defective Work prior to final payment. Pay an appropriate amount to Owner if the acceptance of Defective Work occurs after final payment. 16.05 Uncovering Work A. OPT has the authority to require inspection or testing of the Work, whether or not the Work is fabricated, installed or completed. B. Work that is covered prior to approval of the OAR must be uncovered for OPT's observation if requested by OAR. Pay for uncovering Work and its subsequent restoration unless Contractor has given OAR timely notice of Contractor's intention to cover the Work and OAR fails to act with reasonable promptness in response to this notice. C. Provide necessary labor, material, and equipment and uncover, expose, or otherwise make available the portion of the Work suspected of being Defective for observation, inspection, or testing if OPT considers it necessary or advisable that covered Work be observed by Designer or inspected or tested by others as directed by the OAR. 1. Pay for claims, costs, losses, and damages associated with uncovering, exposing, observing, inspecting, and testing if it is found that the uncovered Work is Defective. Pay costs for correction of Defective Work. Pay for reconstruction, repair, or replacement of work of others resulting from the Defective Work if it is found that the uncovered Work is Defective. General Conditions 007200-66 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 16.06 Owner May Stop the Work A. Owner may order Contractor to stop the Work if: 1. The Work is Defective; 2. Contractor fails to supply sufficient skilled workers or suitable materials or equipment; or 3. Contractor performs Work that may fail to conform to the Contract Documents when completed. This stop work order is to remain in effect until the reason for the stop work order has been eliminated. Owner's right to stop the Work does not create a duty to exercise this right for the benefit of Contractor's Team or surety. 16.07 Owner May Correct Defective Work A. Owner may remedy deficiencies in the Work after 7 days' notice to Contractor if: 1. Contractor fails to correct Defective Work, or to remove and replace rejected Work as required by OPT; 2. Contractor fails to perform the Work in accordance with the Contract Documents; or 3. Contractor fails to comply with other provisions of the Contract Documents. B. Owner may: 1. Exclude Contractor from the Site; 2. Take possession of the Work and suspend Contractor's services related to the Work; and 3. Incorporate stored materials and equipment in the Work. C. Allow OPT access to the Site and off-Site storage areas to enable Owner to exercise the rights and remedies under this Paragraph 16.07. D. All claims, costs, losses, and damages incurred or sustained by Owner in exercising the rights and remedies under this Paragraph 16.07 are to be charged against Contractor as a set-off against payments due under Article 17. These claims, costs, losses, and damages include costs of repair and the cost of replacement of work of others destroyed or damaged by correction, removal, or replacement of Contractor's Defective Work. E. Contractor is not allowed an extension of the Contract Times because of delays in the performance of the Work attributable to the exercise of the Owner's rights and remedies under this Paragraph 16.07. ARTICLE 17—PAYMENTS TO CONTRACTOR; SET-OFFS;COMPLETION; CORRECTION PERIOD 17.01 Progress Payments A. Progress payment requests are to be submitted to the OAR on the Application for Payment form provided by the OAR following procedures in this Article 17. General Conditions 007200-67 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 1. Progress payments for lump sum Work are to be paid on the basis of the earned value to date at the amounts shown in the Schedule of Values submitted as required by Paragraph 17.03. Final payment will be for the total lump sum amount. 2. Progress payments for Unit Price Work are based on the number of units completed as determined under the provisions of Paragraph 15.03. 3. Progress payments for Work to be paid on the basis of the Cost of the Work per Paragraphs 15.01, 15.02 and 15.04 are to be paid for Work completed by Contractor during the pay period. B. Reduction in Payment by Owner: 1. Owner is entitled to impose a set-off against payment based on the following: a. Claims made against Owner or costs, losses,or damages incurred by Owner related to: 1) Contractor's conduct in the performance of the Work, including, but not limited to, workplace injuries, non-compliance with Laws and Regulations, or patent infringement; or 2) Contractor's failure to take reasonable and customary measures to avoid damage, delay, disruption, and interference with other work at or adjacent to the Site, including but not limited to, workplace injuries, property damage, and non-compliance with Laws and Regulations. b. Owner has been required to remove or remediate a Hazardous Environmental Condition for which Contractor is responsible; c. Work is Defective, or completed Work has been damaged by Contractor's Team, requiring correction or replacement; d. Owner has been required to correct Defective Work or complete Work in accordance with Paragraph 16.07; e. The Contract Price has been reduced by Change Orders; f. Events have occurred that would constitute a default by Contractor justifying a termination for cause; g. Liquidated damages have accrued as a result of Contractor's failure to achieve Milestones, Substantial Completion, or completion of the Work; h. Liens have been filed in connection with the Work, except where Contractor has delivered a specific Bond satisfactory to Owner to secure the satisfaction and discharge of these Liens; i. Failure to submit up-to-date record documents as required by the Contract Documents; j. Failure to submit monthly Progress Schedule updates or revised schedules as requested by the OAR; k. Failure to provide Project photographs required by the Contract Documents; I. Failure to provide Certified Payroll required by the Contract Documents; General Conditions 007200-68 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 m. Compensation for OPT for overtime charges of OAR or RPR, third review of documents, review of substitutions, re-inspection fees, inspections or designs related to correction of Defective Work, or other services identified as requiring payment by the Contractor; n. Costs for tests performed by the Owner to verify that Work previously tested and found to be Defective has been corrected; o. OPT has actual knowledge of the occurrence of events that would constitute a default by Contractor and therefore justify termination for cause under the Contract Documents with associated cost impacts; p. Other items entitling Owner to a set-off against the amount recommended; or q. Payment would result in an over-payment of the Contract Price. 2. Compensation for services of OPT staff is to be at the rates established by negotiations between OPT and Contractor. 3. OAR is to notify Contractor stating the amount and the reasons for an imposed set-off. The Owner is to pay the Contractor amounts remaining after deduction of the set-off. Owner is to pay the set-off amount agreed to by Owner and Contractor if Contractor remedies the reasons for the set-off. Contractor may submit a Change Proposal contesting the set-off. C. Delayed Payments: 1. No money shall be paid by Owner upon any claim, debt, demand, or account whatsoever, to any person, firm, or corporation who is in arrears to Owner for taxes; and Owner shall be entitled to counterclaim and automatically offset against any such debt, claim, demand, or account in the amount of taxes so in arrears and no assignment or transfer of such debt, claim, demand, or account after said taxes are due, shall affect the right of Owner to offset said taxes, and associated penalties and interest if applicable, against the same. 2. No payment will be made for Work authorized by a Work Change Directive until the Work Change Directive is incorporated into a Change Order. Payment can be included in an Application for payment when the Change Order is approved. D. The Owner is to pay the amount of payment recommended by the OAR within 30 days after receipt of the Application for Payment and accompanying documentation from the OAR. 17.02 Application for Payment A. Submit Applications for Payment for completed Work and for materials and equipment in accordance with the Supplementary Conditions, the Agreement, and this Article 17. The Contract Price is to include costs for: 1. Providing the Work in accordance with the Contract Documents; 2. Installing Owner furnished equipment and materials; 3. Providing Work for Alternates and Allowances; 4. Commissioning, start-up, training and initial maintenance and operation; 5. Acceptance testing in manufacturer's facilities or on Site; General Conditions 007200-69 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 6. All home office overhead costs and expenses, including profit made directly or indirectly for the Project; 7. Project management, Contract administration, field office, and field operations staff, including supervision, clerical support, and technology system support; 8. Professional services including design fees, legal fees, and other professional services; 9. Bonds and insurance; 10. Permits, licenses, patent fees, and royalties; 11. Taxes; 12. Providing all documents and Samples required by the Contract Documents; 13. Facilities and equipment at the Site including: a. Field offices, office furnishings, and all related office supplies, software, and equipment, b. Storage facilities for Contractor's use, storage facilities for stored materials and equipment, including spare parts storage, c. Shops, physical plant, construction equipment, small tools, vehicles, technology and telecommunications equipment, d. Safety equipment and facilities to provide safe access and working conditions for workers and for others working at the Site, e. Temporary facilities for power and communications, f. Potable water and sanitation facilities, and g. Mobilization and demobilization for all of these facilities and equipment; 14. Products, materials, and equipment stored at the Site or other suitable location; 15. Products, materials, and equipment permanently incorporated into the Project; 16. Temporary facilities for managing water, including facilities for pumping, storage, and treatment as required for construction and protection of the environment; 17. Temporary facilities for managing environment conditions and Constituents of Concern; 18. Temporary facilities such as sheeting, shoring, bracing, formwork, embankments, storage facilities, working areas, and other facilities required for construction of the Project; 19. Temporary and permanent facilities for protection of all overhead, surface, or underground structures or features; 20. Temporary and permanent facilities for removal, relocation, or replacement of any overhead, surface, or underground structures or features; 21. Products, materials, and equipment consumed during the construction of the Project; 22. Contractor labor and supervision to complete the Project, including that provided through Subcontractors or Suppliers; General Conditions 007200-70 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 23. Correcting Defective Work during the Contract Times, during the Correction Period, or as required to meet any warranty provision of the Contract Documents; 24. Risk associated with weather and environmental conditions, start-up, and initial operation of facilities including equipment, processes, and systems; 25. Contractor's safety programs, including management, administration, and training; 26. Maintenance of facilities, including equipment, processes, and systems until operation is transferred to Owner; 27. Providing warranties, extended or special warranties, or extended service agreements; 28. Cleanup and disposal of any and all surplus materials; and 29. Demobilization of all physical, temporary facilities not incorporated into the Project. B. Include the cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the Contract Price. C. Provide written approval of the surety company providing Bonds for the Schedule of Values, Application for Payment form, and method of payment prior to submitting the first Application for Payment. Payment will not be made without this approval. D. OAR may withhold processing Applications for Payment if any of the following processes or documentation are not up to date: 1. Record Documents per Article 20. 2. Progress Schedule per Article 27. 3. Project photographs per Article 28. 4. Documentation required to comply with Owner's Minority / MBE / DBE Participation Policy. 5. Documentation required to substantiate any approved Project deviation, including overruns of Designer's estimated quantity. 6. Documentation required by funding agency, if applicable. 17.03 Schedule of Values A. Submit a detailed Schedule of Values for the Work at least 10 days prior to submitting the first Application for Payment. B. Submit the Schedule of Values in the form attached to the Application for Payment - Tabulation of Earned Value of Original Contract Performed. C. Do not submit an Application for Payment until the Schedule of Values has been approved by the OAR. D. If unit prices are included in the Contract, use each unit price line item in the Contract as a unit price line item in the Schedule of Values. E. Divide lump sum line items, including Subcontractor and Supplier amounts in the Schedule of Values into smaller components to allow more accurate determination of the earned value for each item. General Conditions 007200-71 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 1. Provide adequate detail to allow a more accurate determination of the earned value expressed as a percentage of Work completed for each item. 2. Line items may not exceed $50,000.00, unless they are for products, materials or equipment permanently incorporated into the Project that cannot be subdivided into units or subassemblies. 3. Lump sum items may be divided into an estimated number of units to determine earned value. a. The estimated number of units times the cost per unit must equal the lump sum amount for that line item. b. Contractor will receive payment for the lump sum for the line item, regardless of the number of units installed, unless an adjustment is made by Change Order. 4. Include Contractor's overhead and profit in each line item in proportion to the value of the line item to the Contract Price. 5. Include the cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the Contract Price for each item. 6. These line items may be used to establish the value of Work to be added or deleted from the Project. 7. The sum of all values listed in the schedule must equal the total Contract Price. F. Subdivide each line item in the Schedule of Values into two payment components. The first component is the direct cost for products, materials, and equipment permanently incorporated into the Project. The second component is all other costs associated with the item in the Contract. The sum of the two components must equal the value of the line item in the Schedule of Values. G. Where a percentage of the line value is allowed for a specified stage of completion,show the value for each stage of completion as a component of that line item cost. 17.04 Schedule of Anticipated Payments and Earned Value A. Submit a schedule of the anticipated Application for Payments showing the application numbers, submission dates, and the anticipated amount to be requested. Incorporate retainage into the development of this schedule of anticipated payments. B. Submit a tabulation of the anticipated Total Earned Value of Fees, Work, and Materials to create a graphic (curve) representation of the anticipated progress on the Project each month. Adjust this table and curve to incorporate Modifications. Use this curve to compare actual progress on the Project each month by comparing the anticipated cumulative Total Earned Value of Fees, Work, and Materials to the actual Total Earned Value of Fees, Work, and Materials each month. Use the comparison of values to determine performance on budget and schedule. C. Update the Schedule of Payments as necessary to provide a reasonably accurate indication of the funds required to make payments each month to the Contractor for Work performed. General Conditions 007200-72 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 17.05 Basis for Payments A. Lump Sum Contracts: 1. Payment will be made for the earned value of Work completed during the payment period expressed as a percentage of Work completed for each line item during the payment period per the Contract Documents. 2. Payment amount is the value of Work completed per the Contract Documents multiplied by the percentage of Work completed. 3. Payment for lump sum items divided into an estimated number of units to determine earned value per Paragraph 17.03 will be made for the measured number of units. 4. Payment for stored materials and equipment will be made per Paragraph 17.06. B. Unit Price Contracts: 1. Payment will be made for the actual quantity of Work completed during the payment period and for materials and equipment stored during the payment period per the Contract Documents. a. Payment amount is the Work quantity measured per the Contract Documents multiplied by the unit prices for that line item in the Contract. b. Payment for stored materials and equipment will be made per Paragraph 17.06. 2. Measure the Work described in the Contract for payment. Payment will be made only for the actual measured and/or computed length, area, solid contents, number, and weight, unless other provisions are made in the Contract Documents. Payment on a unit price basis will not be made for Work outside finished dimensions shown in the Contract Documents. Include cost for waste, overages, and tolerances in the unit price for that line item. 17.06 Payment for Stored Materials and Equipment A. Store materials and equipment properly at the Site. 1. Payment will be made for the invoice amount less the specified retainage. 2. Payment for materials and equipment shown in the Application for Payment and attachments will be made for the invoice amount, up to the value shown in the Schedule of Values for that line item. Costs for material and equipment in excess of the value shown in the Schedule of Values may not be added to other line items. 3. Payment will be made in full for the value shown in the line item for products and materials if invoices for materials and equipment are less than the amount shown in the line item and it can be demonstrated that no additional materials or equipment are required to complete Work described in that item. 4. Provide invoices at the time materials are included on the Application for Payment and attachments. Include invoice numbers so that a comparison can be made between invoices and amounts included on the Application for Payment and attachments. B. Provide a bill of sale, invoice, or other documentation warranting that Owner has received the materials and equipment free and clear of Liens. Provide documentation of payment for General Conditions 007200-73 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 materials and equipment with the next Application for Payment. Adjust payment to the amount actually paid if this differs from the invoice amount. Remove items from the tabulation of materials and equipment if this documentation is not provided. Payment will not be made for material and equipment without documentation of payment. C. Contractors can be paid for non-perishable materials on hand stored at the site, provided that invoices are furnished to the City for verification of the material value, and that Contractor provides documents, satisfactory to the City,that show that the material supplier has been paid for the materials delivered to the work site. D. Provide evidence that the materials and equipment are covered by appropriate property insurance or other arrangements to protect Owner's interest. E. The Work covered by progress payments becomes the property of the Owner at the time of payment. The Contractor's obligations with regard to proper care and maintenance, insurance, and other requirements are not changed by this transfer of ownership until accepted in accordance with the General Conditions. F. Payment for materials and equipment does not constitute acceptance of the product. 17.07 Retainage and Set-Offs A. Retainage will be withheld from each Application for Payment per the Agreement. Retainage will be released per the General Conditions. B. Reduce payments for set-offs per the General Conditions. Include the appropriate attachment to the Application for Payment. 17.08 Procedures for Submitting an Application for Payment A. Submit a draft Application for Payment to the OAR each month at least 20 days before the date established in the Contract for Owner to make progress payments. Do not submit Applications for Payment more often than monthly. Review the draft Application for Payment with the OAR to determine concurrence with: 1. The earned value for each lump sum item including the value of properly stored and documented materials and equipment for each item in the original Contract. 2. The quantity of Work completed for each unit price item. 3. Set-offs included in the Application for Payment. 4. Values requested for materials and equipment consistent with invoices for materials and equipment. B. Submit Applications for Payment monthly through the OAR after agreement has been reached on the draft Application for Payment. 1. Number each application sequentially and include the dates for the application period. 2. Show the total amounts for earned value of original Contract performed, earned value for Work on approved Contract Amendments and Change Orders, retainage, and set- offs. Show total amounts that correspond to totals indicated on the attached tabulation for each. General Conditions 007200-74 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 3. Include Attachment A to show the earned value on each line item in the Schedule of Values for Work shown in the original Contract. 4. Include Attachment B to show the earned value on line items for approved Change Orders. Add items to Attachment B as Change Orders are approved. Change Orders must be approved before payment can be made on Change Order items. 5. Include Attachment C to document set-offs required per the Contract Documents. Show each set-off as it is applied. Show a corresponding line item to reduce the set-off amount if a payment held by a set-off is released for payment. 6. Include Attachment D to allow tracking of invoices used to support amounts requested as materials in Attachments A and B. Enter materials to show the amount of the invoice assigned to each item in Attachment A or B if an invoice includes materials used on several line items. 7. Complete the certification stating that all Work, including materials and equipment, covered by this Application for Payment have been completed or delivered and stored in accordance with the Contract Documents,that all amounts have been paid for Work, materials, and equipment for which previous payments have been made by the Owner, and that the current payment amount shown in this Application for Payment is now due. C. Submit attachments in Portable Document Format (PDF): 1. Generate attachments to the Application for Payment using the Excel spreadsheet provided. 2. Submit PDF documents with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. 17.09 Responsibility of Owner's Authorized Representative A. OAR will review draft Application for Payment with Contractor to reach an agreement on the values that will be recommended for payment by the OAR. B. OAR will review Application for Payment submitted by Contractor to determine that the Application for Payment has been properly submitted and is in accordance with the agreed to draft Application for Payment. C. OAR is to either recommend payment of the Application for Payment to Owner or notify the Contractor of the OPT's reasons for not recommending payment. Contractor may make necessary corrections and resubmit the Application for Payment if it is not recommended within 10 days after receipt of the notice. OAR will review resubmitted Application for Payment and reject or recommend payment of the Application for Payment to Owner as appropriate. D. OAR's recommendation of the Application for Payment constitutes a representation by OPT that based on their experience and the information available: 1. The Work has progressed to the point indicated; 2. The quality of the Work is generally in accordance with the Contract Documents; and 3. Requirements prerequisite to payment have been met. General Conditions 007200-75 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 E. This representation is subject to: 1. Further evaluation of the Work as a functioning whole; 2. The results of subsequent tests called for in the Contract Documents; or 3. Any other qualifications stated in the recommendation. F. OPT does not represent by recommending payment: 1. Inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work; or 2. Other matters or issues between the parties that might entitle Contractor to additional compensation or entitle Owner to withhold payment to Contractor may or may not exist. G. Neither OPT's review of Contractor's Work for the purposes of recommending payments nor OAR's recommendation of payment imposes responsibility on OPT: 1. To supervise, direct, or control the Work; 2. For the means, methods, techniques, sequences, or procedures of construction, or safety precautions and programs; 3. For Contractor's failure to comply with Laws and Regulations applicable to Contractor's performance of the Work; 4. To make examinations to ascertain how or for what purposes Contractor has used the monies paid on account of the Contract Price; or 5. To determine that title to the Work, materials, or equipment has passed to Owner free and clear of Liens. 17.10 Contractor's Warranty of Title A. Contractor warrants and guarantees that title to the Work, materials, and equipment furnished under the Contract is to pass to Owner free and clear of Liens, title defects, and patent, licensing, copyright, or royalty obligations no later than 7 days after the time of payment by Owner of the Application for Payment which includes these items. 17.11 Substantial Completion A. Notify OAR when Contractor considers the entire Work substantially complete and request a Certificate of Substantial Completion. B. OPT is to inspect the Work within 30 days after Contractor's notification to determine if the Work is substantially complete. OAR, within 120 days after receipt of Contractor's notification, is to either issue the Certificate of Substantial Completion which sets the date of Substantial Completion or notify Contractor of the reasons the Project is not considered to be substantially complete. General Conditions 007200-76 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 C. The OPT and Contractor are to meet to discuss Owner's use or occupancy of the Work following Substantial Completion. Items to be discussed at this meeting include: 1. Review of insurance policies with respect to the end of the Contractor's coverage, and confirm the transition to coverage of the Work under a permanent property insurance policy held by Owner; 2. Owner's assumption of responsibility for security, operation, protection of the Work, maintenance, and utilities upon Owner's use or occupancy of the Work; 3. Contractor's obligations for operations and maintenance during performance and acceptance testing; 4. Contractor's access to the Site to complete punch list items; and 5. Procedures for correction of Defective Work during the 1-year correction period. 17.12 Partial Utilization A. Owner may use or occupy substantially completed parts of the Work which are specifically identified in the Contract Documents, or which OPT and Contractor agree constitutes a separately functioning and usable part of the Work prior to Substantial Completion of the Work. Owner must be able to use that part of the Work for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. Contractor and OPT are to follow the procedures of Paragraph 17.11 forthis part ofthe Work. B. No use or occupancy or separate operation of part of the Work may occur prior to compliance with the requirements of Article 6. 17.13 Final Inspection A. OPT is to make a final inspection upon notice from Contractor that the entire Work or portion to be accepted is complete. OAR is to notify Contractor of Work determined to be incomplete or Defective. Immediately take corrective measures to complete the Work and correct Defective Work. 17.14 Final Application for Payment A. Include adjustments to the Contract Price in the final Application for Payment for: 1. Approved Change Orders and Contract Amendments, 2. Allowances not previously adjusted by Change Order, 3. Deductions for Defective Work that has been accepted by the Owner, 4. Penalties and bonuses, 5. Deductions for liquidated damages, 6. Deduction for all final set-offs, and 7. Other adjustments if needed. B. OAR will prepare a final Change Order reflecting the approved adjustments to the Contract Price which have not been covered by previously approved Change Orders and if necessary reconcile estimate unit price quantities with actual quantities. General Conditions 007200-77 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 17.15 Final Payment A. Make final Application for Payment after completing required corrections identified during the final inspection and delivering items and documents required by the Contract Documents. Provide the following with the final Application for Payment: 1. Consent of Surety to Final Payment acknowledging unsettled disputes; and 2. Certification of Payment of Debts and Claims or Certification of Release of Liens or furnish receipts or releases in full from Subcontractors and Suppliers. B. OAR is to either recommend payment of the final Application for Payment to Owner if OPT is satisfied that the Work has been completed and Contractor's other obligations under the Contract Documents have been fulfilled or notify the Contractor of the OPT's reasons for not recommending final payment. C. The Work is complete, subject to surviving obligations, when it is ready for final payment as established by the OAR's recommendation of payment of the final Application for Payment to Owner and the issuance of a Certificate of Final Completion. D. The Owner is to pay the amount of final payment recommended by the OAR within 30 days after receipt of the final Application for Payment and accompanying documentation from the OAR. 17.16 Waiver of Claims A. The making of final payment does not constitute a waiver by Owner of claims or rights against Contractor. Owner expressly reserves claims and rights arising from: 1. Unsettled Liens or claims for non-payment; 2. Defective Work appearing after final inspection; 3. Contractor's failure to comply with the Contract Documents or the terms of specified special guarantees; or 4. Contractor's continuing obligations under the Contract Documents. B. Contractor waives claims and rights against Owner by accepting final payment with the exception of those Claims made in accordance with the provisions of Article 22 and specifically noted in the Certificate of Final Completion. 17.17 Correction Period A. Promptly correct Defective Work without cost to Owner for 1 year after the date of Substantial Completion or, in the event of a latent defect, within 1 year after discovery thereof by City. B. Promptly correct damages to the Site or adjacent areas that Contractor has arranged to use through construction easements or other agreements. Promptly correct damages to Work or the work of others. Make corrections without cost to Owner. C. Owner may have the Defective Work and damages described in Paragraphs 17.17.A and 17.17.B corrected if Contractor does not comply with the terms of OAR's instructions, or in an emergency where delay would cause serious risk of loss or damage. General Conditions 007200-78 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 D. Contractor's obligation to indemnify Owner for claims arising out of or related to the correction of Defective Work are as set forth in Paragraph 7.14. E. The correction period starts to run from the date when a specific item of equipment or system is placed in continuous beneficial use by Owner before Substantial Completion of Work if so provided in the Specifications or if accepted for beneficial use by the Owner. F. Contractor's obligations under this Paragraph 17.17 are in addition to other obligations or warranties. The provisions of this Paragraph 17.17 are not a substitute for, or a waiver of, the provisions of applicable statutes of limitation or repose. ARTICLE 18—SUSPENSION OF WORK AND TERMINATION 18.01 Owner May Suspend Work A. Owner may suspend the Work or a portion of the Work for a period of not more than 90 consecutive days, at any time and without cause, by notice to Contractor. This notice fixes the date on which Contractor is to resume Work. Contractor is entitled to adjustments in the Contract Price and Contract Times directly attributable to this suspension only if efforts are made to mitigate the cost impacts of the suspension. Meet with the Owner within 10 days of the notice of suspension to discuss specific strategies to reduce or eliminate the cost of delays. Submit a Change Proposal seeking an adjustment no later than 30 days after the date fixed for resumption of Work. 18.02 Owner May Terminate for Cause A. The occurrence of one or more of the following events constitutes a default by Contractor and justifies termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents, including failure to supply sufficient skilled workers or suitable materials or equipment; 2. Failure to adhere to the Progress Schedule; 3. Failure of the Contractor to provide a satisfactory replacement Bond or insurance in the event either is lost or canceled; 4. Failure of Contractor to maintain financial solvency to adequately complete the Project as indicated by one or more of the following: a. A petition of bankruptcy is filed by or against Contractor, b. Contractor is adjudged as bankrupt or insolvent, c. Contractor or surety makes a general assignment for the benefit of creditors, d. A receiver is appointed for the benefit of Contractor's creditors, or e. A receiver is appointed on account of Contractor's insolvency; 5. Contractor's disregard of Laws or Regulations of public bodies having jurisdiction; 6. Contractor's repeated disregard of the authority of OPT; 7. Contractor's failure to prosecute the work with diligence; or General Conditions 007200-79 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 8. Contractor's other material breach of the contract. B. Contractor and surety must provide adequate assurance of future performance in accordance with the Contract Documents that is satisfactory to Owner if Contractor is believed to be in financial distress due to the existence of one or more of the indicators listed in Paragraph 18.02.A.4. Owner may terminate Contractor's performance under this Contract if Contractor and surety fail to provide adequate documentation satisfactory to Owner within 10 days of OAR's request for this information. C. Owner may declare Contractor to be in default, give notice to Contractor and surety that Contractor's performance under the Contract is terminated, and enforce the rights available to Owner under the Performance Bond after giving Contractor and surety 10 days' notice that one or more of the events identified in Paragraph 18.02.A has occurred. D. Owner may exclude Contractor from the Site, take possession of the Work, incorporate the materials and equipment stored and complete the Work as Owner may deem expedient if Owner has terminated Contractor's performance under the Contract for cause. E. Owner may elect not to proceed with termination of Contractor's performance under the Contract under this Paragraph 18.02 if Contractor begins to cure the cause for termination within 7 days of receipt of notice of intent to terminate. F. Contractor is not entitled to receive further payments until the Work is completed if Owner proceeds as provided in this Paragraph 18.02. The amount of the Contract Price remaining is to be paid to the Contractor if the unpaid balance exceeds the cost to complete the Work. The cost to complete the Work may include related claims, costs, losses, damages, and the fees and charges of engineers, architects, attorneys, and other professionals retained by Owner. Pay the difference to Owner if the cost to complete the Work including related claims, costs, losses, and damages exceeds the unpaid balance of the Contract Price. Owner is not required to obtain the lowest price for the Work performed when exercising its rights or remedies under this paragraph. G. Termination of Contractor's performance does not affect the rights or remedies of Owner against Contractor or against surety under the Payment Bond or Performance Bond. Owner does not release Contractor from liability by paying or retaining money due Contractor. H. In the event the Owner terminates the contract for cause, and it is later determined that cause for termination was lacking, the termination will be deemed a termination without cause under Paragraph 18.03. 18.03 Owner May Terminate For Convenience A. Owner may terminate the Contract without cause after giving 7 days' notice to Contractor of the effective date of termination. Contractor is to be paid for the following if Owner terminates for convenience: 1. Work completed in accordance with the Contract Documents prior to the effective date of termination; 2. Actual costs sustained prior to the effective date of termination for Work in progress, plus a fee calculated in accordance with Paragraph 15.05; and 3. Reasonable expenses directly attributable to termination, including costs incurred to prepare a termination for convenience cost proposal. General Conditions 007200-80 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 B. No payment is payable to Contractor for loss of anticipated overhead, profits or revenue, or other economic loss arising out of or resulting from this termination. ARTICLE 19— PROJECT MANAGEMENT 19.01 Work Included A. Furnish resources required to complete the Project with an acceptable standard of quality within the Contract Times. B. Construct Project in accordance with current safety practices. C. Manage Site to allow access to Site and control construction operations. D. Construct temporary facilities to provide and maintain control over environmental conditions at the Site. Remove temporary facilities when no longer needed. E. Provide temporary controls for pollutions, management of water and management of excess earth. 19.02 Quality Assurance A. Employ competent workmen,skilled in the occupation for which they are employed. Provide Work meeting quality requirements of the Contract Documents. B. Remove Defective Work from the Site immediately unless provisions have been made and approved by the OPT to allow repair of the product at the Site. Clearly mark Work as Defective until it is removed or allowable repairs have been completed. 19.03 Document Submittal A. Provide documents in accordance with Article 24. 1. Provide copies of Supplier's printed storage instructions prior to furnishing materials or products and installation instructions prior to beginning the installation. 2. Incorporate field notes,sketches, recordings,and computations made by the Contractor in Record Data. 19.04 Required Permits A. Obtain building permits for the Project from the local authorities having jurisdiction. Pay building permit fees and include this cost in the Contract Price. B. Obtain environmental permits required for construction at the Site. C. Provide required permits for transporting heavy or oversized loads. D. Provide other permits required to conduct any part of the Work. E. Arrange for inspections and certification by agencies having jurisdiction over the Work. F. Make arrangements with private utility companies and pay for fees associated with obtaining services, or for inspection fees. G. Retain copies of permits and licenses at the Site and observe and comply with all regulations and conditions of the permit or license. General Conditions 007200-81 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 19.05 Safety Requirements A. Manage safety to protect the safety and welfare of persons at the Site. B. Provide safe access to move through the Site. Provide protective devices to warn and protect from hazards at the Site. C. Provide safe access for those performing tests and inspections. D. Comply with latest provisions of the Occupational Health and Safety Administration and other Laws and Regulation. E. Cooperate with accident investigations. Provide two copies of all reports, including insurance company reports, prepared concerning accidents, injury, or death related to the Project to the OAR as Record Data per Article 26. 19.06 Access to the Site A. Maintain access to the facilities at all times. Do not obstruct roads, pedestrian walks, or access to the various buildings, structures, stairways, or entrances. Provide safe access for normal operations during construction. B. Provide adequate and safe access for inspections. Leave ladders, bridges, scaffolding, and protective equipment in place until inspections have been completed. Construct additional safe access if required for inspections. C. Use roadways for construction traffic only with written approval of the appropriate representatives of each entity. Obtain written approval to use roads to deliver heavy or oversized loads to the Site. Furnish copies of the written approvals to the Owner as Record Data per Article 26. 19.07 Contractor's Use of Site A. Limit the use of Site for Work and storage to those areas designated on the Drawings or approved by the OAR. Coordinate the use of the premises with the OAR. B. Provide security at the Site as necessary to protect against vandalism and loss by theft. C. Do not permit alcoholic beverages or illegal substances on the Site. Do not allow persons under the influence of alcoholic beverages or illegal substances to enter or remain on the Site at any time. Persons on Site under the influence of alcoholic beverages or illegal substances will be permanently prohibited from returning to the Site. Criminal or civil penalties may also apply. D. Park construction equipment in designated areas only and provide spill control measures. E. Park employees'vehicles in designated areas only. F. Obtain written permission of the Owner before entering privately-owned land outside of the Owner's property, rights-of-way, or easements. G. Do not allow the use of audio devices, obnoxious, vulgar or abusive language, or sexual harassment in any form. These actions will cause immediate and permanent removal of the offender from the premises. Criminal or civil penalties may apply. General Conditions 007200-82 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 H. Require Workers to wear clothing that is inoffensive and meets safety requirements. Do not allow sleeveless shirts, shorts, exceedingly torn, ripped, or soiled clothing to be worn on the Project. I. Do not allow firearms or weapons of any sort to be brought on to the Site under any conditions. No exception is to be made for persons with concealed handgun permits. Remove any firearms or weapons and the person possessing these firearms or weapons immediately from the Site. 19.08 Protection of Existing Structures and Utilities A. Examine the Site and review the available information concerning the Site. Locate utilities, streets, driveways, fences, drainage structures, sidewalks, curbs, and gutters. Verify the elevations of the structures adjacent to excavations. Report any discrepancies from information in the Contract Documents to the OAR before beginning construction. B. Determine if existing structures, poles, piping, or other utilities at excavations will require relocation or replacement. Prepare a Plan of Action and coordinate Work with local utility companies and others for the relocation or replacement. C. Protect buildings, utilities, street surfaces, driveways, sidewalks, curb and gutter, fences, wells, drainage structures, piping, valves, manholes, electrical conduits, and other systems or structures unless they are shown to be replaced or relocated on the Drawings. Restore damaged items to the satisfaction of the OPT and utility owner. D. Carefully support and protect all structures and/or utilities so that there will be no failure or settlement where excavation or demolition endangers adjacent structures and utilities. Do not take existing utilities out of service unless required by the Contract Documents or approved by the OAR. Notify and cooperate with the utility owner if it is necessary to move services, poles,guy wires, pipelines, or other obstructions. E. Protect existing trees and landscaping at the Site. 1. Identify trees that may be removed during construction with OPT. 2. Mark trees to be removed with paint. 3. Protect trees to remain from damage by wrapping trunks with 2 x 4 timbers around the perimeter, securely wired in place, where machinery must operate around existing trees. Protect branches and limbs from damage by equipment. 4. Protect root zone from compaction. 19.09 Pre-Construction Exploratory Excavations A. Excavate and expose existing pipelines that cross within 20 feet of Project pipelines prior to any Work. Survey the line to determine its exact vertical and horizontal location at each point the existing pipeline may potentially conflict with the Work. B. Excavate and expose existing parallel pipelines at 300 feet intervals (maximum) for existing pipelines which are within 10 feet of Project pipelines. Survey the line to determine its exact vertical and horizontal location at each point where the line is excavated and exposed. General Conditions 007200-83 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 C. Prepare a Plan of Action indicating the owner of pipelines excavated and surveyed and all pertinent survey data, including the station where lines cross or conflicts may exist and the distance to the pavement centerline and elevations of the top of existing pipelines. D. Do not perform Work on the Project until all exploratory excavations have been completed and the Plan of Action has been approved by the OAR. E. Unless specifically indicated otherwise in the Bid Form, no separate payment will be made for pre-construction exploratory excavations. Include the cost for pre-construction exploratory excavations in the unit price for the pipe construction or other applicable feature. When necessary, pavement repairs associated with exploratory excavations that are beyond the limits of the new pavement will be paid for at the unit prices for pavement repair when an item is included in the Bid Form. When an item for pavement repair is not included in the Bid Form, the cost should be included in the unit price for the pipe construction or other applicable feature. 19.10 Disruption of Services/Continued Operations A. Existing facilities are to continue in service as usual during the construction unless noted otherwise. Owner of utilities must be able to operate and maintain the facilities. Keep disruptions to existing utilities, piping, process piping, or electrical services to a minimum. 1. Do not restrict access to critical valves or operators. 2. Limit operations to the minimum amount of space needed to complete the specified Work. 3. Maintain storm sewers and sanitary sewers in service at all times. Provide temporary service around the construction or otherwise construct the structure in a manner that the flow is not restricted. B. Provide a Plan of Action if facilities must be taken out of operation. 19.11 Field Measurements A. Perform complete field measurements prior to purchasing products or beginning construction for products required to fit existing conditions. B. Verify property lines, control lines,grades, and levels indicated on the Drawings. C. Check Shop Drawings and indicate the actual dimensions available where products are to be installed. D. Include field measurements in Record Data as required in Article 26. 19.12 Reference Data and Control Points A. The OPT will provide the following control points: 1. Base line or grid reference points for horizontal control. 2. Benchmarks for vertical control. B. Locate and protect control points prior to starting the Work and preserve permanent reference points during construction. Designated control points may be on an existing structure or monument. Do not change or relocate points without prior approval of the OAR. General Conditions 007200-84 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Notify OAR when the reference point is lost, destroyed, or requires relocation. Replace Project control points on the basis of the original survey. C. Provide complete engineering layout of the Work needed for construction. 1. Provide competent personnel. Provide equipment including accurate surveying instruments, stakes, platforms,tools, and materials. 2. Provide surveying with accuracy meeting the requirements established for Category 5 Construction Surveying as established in the Manual of Practice of Land Surveying in Texas published by the Texas Society of Professional Surveyors, latest revision. 3. Record Data and measurements per standards. 19.13 Delivery and Storage A. Deliver products and materials to the Site in time to prevent delays in construction. B. Deliver packaged products to Site in original undamaged containers with identifying labels attached. Open cartons as necessary to check for damage and to verify invoices. Reseal cartons and store properly until used. Leave products in packages or other containers until installed. C. Assume full responsibility for the protection and safekeeping of products stored at the Site. D. Store products at locations acceptable to the OAR and to allow Owner access to maintain and operate existing facilities. E. Store products in accordance with the Supplier's storage instructions immediately upon delivery. Leave seals and labels intact. F. Provide additional storage areas as needed for construction. Store products subject to damage by elements in substantial weather-tight enclosures or storage sheds. Provide and maintain storage sheds as required for the protection of products. Provide temperature, humidity control, and ventilation within the ranges stated in the Supplier's instructions. Remove storage facilities at the completion of the Project. G. Protect the pipe interior. Keep all foreign materials such as dirt, debris, animals, or other objects out of the pipe during the Work. Cap or plug ends of installed pipe in an approved manner when pipe is not being installed. Clean or wash out pipe sections that become contaminated before continuing with installation. Take precautionsto preventthe pipefrom floating or moving out of the proper position during or after laying operations. Immediately correct any pipe that moves from its correct position. H. Provide adequate exterior storage for products that may be stored out-of-doors. 1. Provide substantial platforms, blocking, or skids to support materials and products above ground which has been sloped to provide drainage. Protect products from soiling or staining. 2. Cover products subject to discoloration or deterioration from exposure to the elements, with impervious sheet materials. Provide ventilation to prevent condensation below covering. 3. Store loose, granular materials on clean, solid surfaces, or on rigid sheet materials, to prevent mixing with foreign matter. General Conditions 007200-85 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 4. Provide surface drainage to prevent erosion and ponding of water. 5. Prevent mixing of refuse or chemically injurious materials or liquids with stored materials. 6. Pipes and conduits stored outdoors are to have open ends sealed to prevent the entrance of dirt, moisture, and other injurious materials. Protect PVC pipe from ultraviolet light exposure. 7. Store light weight products to prevent wind damage. I. Maintain storage facilities. Inspect stored products on a weekly basis and after periods of severe weather to verify that: 1. Storage facilities continue to meet specified requirements; 2. Supplier's required environmental conditions are continually maintained; and 3. Products that can be damaged by exposure to the elements are not adversely affected. J. Replace any stored item damaged by inadequate protection or environmental controls. K. Payment may be withheld for any products not properly stored. 19.14 Cleaning During Construction A. Provide positive methods to minimize raising dust from construction operations and provide positive means to prevent air-borne dust from disbursing into the atmosphere. Control dust and dirt from demolition, cutting, and patching operations. B. Clean the Project as Work progresses and dispose of waste materials, keeping the Site free from accumulations of waste or rubbish. Provide containers on Site for waste collection. Do not allow waste materials or debris to blow around or off of the Site. Control dust from waste materials. Transport waste materials with as few handlings as possible. C. Comply with Laws and Regulations. Do not burn or bury waste materials. Remove waste materials, rubbish and debris from the Site and legally dispose of these at public or private disposal facilities. D. Provide a final cleaning to thoroughly clean the entire Site and make ready for acceptance. 1. Remove construction debris, boxes, and trash from the Site. 2. Remove construction storage sheds and field offices. 3. Restore grade to match surrounding condition and remove excess dirt. 4. Sweep all drives and parking lots clean of dirt and debris. Use water trucks or hose down paved site to like new appearance. 19.15 Maintenance of Roads, Driveways, and Access A. Maintain roads and streets in a manner that is suitable for safe operations of public vehicles during all phases of construction unless the Owner approves a street closing. Do not close public roads overnight. B. Submit a Notification by Contractor for Owner's approval of a street closing. The request shall state: General Conditions 007200-86 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 1. The reason for closing the street. 2. How long the street will remain closed. 3. Procedures to be taken to maintain the flow of traffic. C. Construct temporary detours, including by-pass roads around construction,with adequately clear width to maintain the free flow of traffic at all times. Maintain barricades, signs, and safety features around the detour and excavations. Maintain barricades, signs, and safety features around the Work in accordance with all provisions of the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD). D. Assume responsibility for any damage resulting from construction along roads or drives. 19.16 Area Access and Traffic Control A. Provide traffic control measures to assure a safe condition and to provide a minimum of inconvenience to motorists and the public. Provide all-weather access to all residents and businesses at all times during construction. Provide temporary driveways and/or roads of approved material during wet weather. Maintain a stockpile of suitable material on the Site to meet the demands of inclement weather. B. Schedule operations to minimize adverse impact on the accessibility of adjoining properties. Sequence construction to build driveways in half widths, construct temporary ramps, or any other measure required to maintain access to adjoining properties. C. Comply with the Owner's Uniform Barricading Standards and Practices. Copies of this document are available through the Owner's Traffic Engineering Department. Secure required permits from the Owner's Traffic Engineering Department. 19.17 Overhead Electrical Wires A. Comply with OSHA safety requirements regarding construction equipment working beneath overhead electrical wires. Prevent and pay for repairs for damage to existing overhead electrical wires or facilities. B. Provide for adequate safety with regard to overhead lines whether overhead lines are or are not shown in the Contract Documents. 19.18 Blasting A. Blasting is not allowed for any purpose. 19.19 Archeological Requirements A. Cease operations immediately and contact the Owner for instructions if historical or archaeological artifacts are found during construction. B. Conduct all construction activities to avoid adverse impact on the Sites where significant historical or archaeological artifacts are found or identified as an area where other artifacts could be found. 1. Obtain details for Working in these areas. 2. Maintain confidentiality regarding the Site. General Conditions 007200-87 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 3. Adhere to the requirements of the Texas Historical Commission. 4. Notify the OAR and the Texas Historical Commission. C. Do not disturb archaeological sites. 1. Obtain the services of a qualified archaeological specialist to instruct construction personnel on how to identify and protect archaeological finds on an emergency basis. 2. Coordinate activities to permit archaeological work to take place within the area. a. Attempt to archaeologically clear areas needed for construction as soon as possible. b. Provide a determination of priority for such areas. D. Assume responsibility for any unauthorized destruction that might result to such Sites by construction personnel, and pay all penalties assessed by the State or Federal agencies for non-compliance with these requirements. E. Contract Times will be modified to compensate for delays caused by such archaeological finds. No additional compensation will be paid for delays. 19.20 Endangered Species Resources A. Do not perform any activity that is likely to jeopardize the continued existence of a threatened or endangered species as listed or proposed for listing under the Federal Endangered Species Act (ESA), and/or the State of Texas Parks and Wildlife Code on Endangered Species, or to destroy or adversely modify the habitat of such species. B. Cease Work immediately in the area of the encounter and notify the OAR if a threatened or endangered species is encountered during construction. OPT will implement actions in accordance with the ESA and applicable State statutes. Resume construction in the area of the encounter when authorized to do so by the OAR. 19.21 Cooperation with Public Agencies A. Cooperate with all public and private agencies with facilities operating within the limits of the Project. B. Provide a 48-hour notice to any applicable agency when work is anticipated to proceed in the vicinity of any facility by using Texas 811 at 811 and the Lone Star Notification Company at 1-800-669-8344. ARTICLE 20—PROJECT COORDINATION 20.01 Work Included A. Administer Contract requirements to construct the Project. Provide documentation per the requirements of this Section. Provide information as requested by the OPT. 20.02 Document Submittal A. Provide documents in accordance with Article 24. General Conditions 007200-88 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 B. Use the forms provided for Contract administration, applications for payment, document submittals, documentation of test results, equipment installation and documentation, and Project closeout. A digital copy of the required forms will be provided to the Contractor before or at the pre-construction conference. 20.03 Communication During Project A. The OAR is to be the first point of contact for all parties on matters concerning this Project. B. The OAR will coordinate correspondence concerning: 1. Documents, including Applications for Payment. 2. Clarification and interpretation of the Contract Documents. 3. Contract Modifications. 4. Observation of Work and testing. 5. Claims. C. The OAR will normally communicate only with the Contractor. Any required communication with Subcontractors or Suppliers will only be with the direct involvement of the Contractor. D. Direct written communications to the OAR at the address indicated at the pre-construction conference. Include the following with communications as a minimum: 1. Name of the Owner. 2. Project name. 3. Contract title. 4. Project number. 5. Date. 6. A reference statement. 20.04 Project Meetings A. Pre-Construction Conference: 1. Attend a pre-construction conference. 2. The location of the conference will be determined by the OAR. 3. The time of the meeting will be determined by the OAR but will be after the Notice of Award is issued and not later than 15 days after the Notice to Proceed is issued. 4. The OPT, Contractor's project manager and superintendent, representatives of utility companies, and representatives from major Subcontractors and Suppliers may attend the conference. 5. Provide and be prepared to discuss: a. Preliminary construction schedule per Article 27. b. Schedule of Values and anticipated Schedule of Payments per Article 17. C. List of Subcontractors and Suppliers. General Conditions 007200-89 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 d. Contractor's organizational chart as it relates to this Project. e. Letter indicating the agents of authority for the Contractor and the limit of that authority with respect to the execution of legal documents,Contract Modifications, and payment requests. B. Progress Meetings: 1. Attend meetings with the OAR and Owner. a. Meet on a monthly basis or as requested by the OAR to discuss the Project. b. Meet at the Site or other location as designated by the OAR. c. Contractor's superintendent and other key personnel are to attend the meeting. Other individuals may be requested to attend to discuss specific matters. d. Notify the OAR of any specific items to be discussed a minimum of 1 week prior to the meeting. 2. Provide information as requested by the OAR or Owner concerning this Project. Prepare to discuss: a. Status of overall Project schedule. b. Contractor's detailed schedule for the next month. c. Anticipated delivery dates for equipment. d. Coordination with the Owner. e. Status of documents. f. Information or clarification of the Contract Documents. g. Claims and proposed Modifications to the Contract. h. Field observations, problems, or conflicts. i. Maintenance of quality standards. 3. OAR will prepare minutes of meetings. Review the minutes of the meeting and notify the OAR of any discrepancies within 10 days of the date of the meeting memorandum. The minutes will not be corrected after the 10 days have expired. Corrections will be reflected in the minutes of the following meeting or as an attachment to the minutes. C. Pre- Submittal and Pre-Installation Meetings: 1. Conduct pre-submittal and pre-installation meetings as required in the individual technical Specifications or as determined necessary by the OAR (for example, instrumentation, roofing, concrete mix design, etc.). 2. Set the time and location of the meetings when ready to proceed with the associated Work. Submit a Notification by Contractor in accordance with Paragraph 20.07 for the meeting 2 weeks before the meeting. OPT must approve of the proposed time and location. 3. Attend the meeting and require the participation of appropriate Subcontractors and Suppliers in the meeting. General Conditions 007200-90 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 4. Prepare minutes of the meeting and submit to the OPT for review. OPT will review the minutes of the meeting and notify the Contractor of any discrepancies within 10 days of the date of the meeting memorandum. The minutes will not be corrected after the 10 days have expired. Corrections will be reflected in a revised set of meeting minutes. 20.05 Requests for Information A. Submit Request for Information (RFI) to the OAR to obtain additional information or clarification of the Contract Documents. 1. Submit a separate RFI for each item on the form provided. 2. Attach adequate information to permit a written response without further clarification. OAR will return requests that do not have adequate information to the Contractor for additional information. Contractor is responsible for all delays resulting from multiple document submittals due to inadequate information. 3. A response will be made when adequate information is provided. Response will be made on the RFI form or in attached information. B. Response to an RFI is given to provide additional information, interpretation, or clarification of the requirements of the Contract Documents, and does not modify the Contract Documents. C. Designer will initiate a Request for a Change Proposal (RCP) per Article 12 if the RFI indicates that a Contract Modification is required. D. Use the Project Issues Log to document decisions made at meetings and actions to be taken in accordance with Paragraph 20.06. E. Use the Action Item Log to document assignments for actions to be taken in accordance with Paragraph 20.06. 20.06 Decision and Action Item Log A. OAR will maintain a Project Decision Log to document key decisions made at meetings, telephone conversation or Site visits using the format provided: 1. Review the log prior to each regular meeting. 2. Report any discrepancies to the OAR for correction or discussion at the next monthly meeting. B. OAR will maintain an Action Item log in conjunction with the Project Decision Log to track assignments made at meetings, telephone conversation, or Site visits using the format provided: 1. Review the Action Item Log prior to each regular meeting. 2. Report actions taken subsequent to the previous progress meeting on items in the log assigned to the Contractor or through the Contractor to a Subcontractor or Supplier to the OAR. Report on status of progress 1 week prior to each progress meeting established in Paragraph 20.04 to allow OAR to update the log prior to the Progress meetings. 3. Be prepared to discuss the status at each meeting. General Conditions 007200-91 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 C. Decisions or action items in the log that require a change in the Contract Documents will have the preparation of a Modification as an action item if appropriate. The Contract Documents can only be changed by a Modification. 20.07 Notification By Contractor A. Notify the OAR of: 1. Need for testing. 2. Intent to work outside regular working hours. 3. Request to shut down facilities or utilities. 4. Proposed utility connections. 5. Required observation by OAR, Designer, or inspection agencies prior to covering Work. 6. Training. B. Provide notification a minimum of 2 weeks in advance in order to allow OPT time to respond appropriately to the notification. C. Use "Notification by Contractor"form provided. 20.08 Record Documents A. Maintain at the Site one complete set of printed Record Documents including: 1. Drawings. 2. Specifications. 3. Addenda. 4. Modifications. 5. Record Data and approved Shop Drawings. 6. Construction photographs. 7. Test Reports. 8. Clarifications and other information provided in Request for Information responses. 9. Reference standards. B. Store printed Record Documents and Samples in the Contractor's field office. 1. Record Documents are to remain separate from documents used for construction. 2. Provide files and racks for the storage of Record Documents. 3. Provide a secure storage space for the storage of Samples. 4. Maintain Record Documents in clean, dry, legible conditions, and in good order. 5. Make Record Documents and Samples available at all times for inspection by the OPT. C. Maintain a digital record of Specifications and Addenda to identify products provided in PDF format. General Conditions 007200-92 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 1. Reference the Record Data number, Shop Drawings number, and O&M manual number for each product and item of equipment furnished or installed. 2. Reference Modifications by type and number for all changes. D. Maintain a digital record of Drawings in PDF format. 1. Reference the Record Data number, Shop Drawings number, and O&M manual number for each product and item of equipment furnished or installed. 2. Reference Modifications by type and number for all changes. 3. Record information as construction is being performed. Do not conceal any Work until the required information is recorded. 4. Mark Drawings to record actual construction, including the following: a. Depths of various elements of the foundation in relation to finished first floor datum or the top of walls. b. Horizontal and vertical locations of underground utilities and appurtenances constructed and existing utilities encountered during construction. C. Location of utilities and appurtenances concealed in the Work. Refer measurements to permanent structures on the surface. Include the following equipment: 1) Piping. 2) Ductwork. 3) Equipment and control devices requiring periodic maintenance or repair. 4) Valves, unions,traps, and tanks. 5) Services entrance. 6) Feeders. 7) Outlets. d. Changes of dimension and detail. e. Changes by Modifications. f. Information in Request for Information or included in the Project Issues Log. g. Details not on the original Drawings. Include field verified dimensions and clarifications, interpretations, and additional information issued in response to RFIs. 5. Mark Drawings with the following colors: a. Highlight references to other documents, including Modifications in blue; b. Highlight mark ups for new or revised Work(lines added) in yellow; C. Highlight items deleted or not installed (lines to be removed) in red; and d. Highlight items constructed per the Contract Documents in green. General Conditions 007200-93 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 6. Submit Record Documents to Designer for review and acceptance 30 days prior to Final Completion of the Project. E. Applications for Payment will not be recommended for payment if Record Documents are found to be incomplete or not in order. Final payment will not be recommended without complete Record Documents. ARTICLE 21—QUALITY MANAGEMENT 21.01 Contractor's Responsibilities A. Review the OPT's Quality Management Program and prepare and submit the Contractor's Quality Control Plan. B. Implementthe Contractor's Quality Control Plan to control the quality of the Work and verify that the Work meets the standards of quality established in the Contract Documents. 1. Inspect products to be incorporated into the Project. Ensure that Suppliers have adequate quality control systems to ensure that products that comply with the Contract Documents are provided. 2. Integrate quality control measures into construction activities to produce Work which meets quality expectations of the Contract Documents. Inspect the Work of the Contractor, Subcontractors, and Suppliers. Correct Defective Work. 3. Provide and pay for the services of an approved professional materials testing laboratory acceptable to the OPT to provide testing that demonstrates that products proposed in Shop Drawings and Record Data for the Project fully comply with the Contract Documents. 4. Provide facilities, equipment, and Samples required for quality control inspections and tests: a. Give the OAR adequate notice before proceeding with Work that would interfere with inspections or testing; b. Notify the OAR and testing laboratories prior to the time that testing is required, providing adequate lead time to allow arrangements for inspections or testing to be made; C. Do not proceed with any Work that would impact the ability to correct defects or Work that would require subsequent removal to correct defects until testing services have been performed and results of tests indicate that the Work is acceptable; d. Cooperate fully with the performance of sampling, inspection, and testing; e. Provide personnel to assist with sampling or to assist in making inspections and field tests; f. Obtain and handle Samples for testing at the Site or at the production source of the product to be tested; g. Provide adequate quantities of representative products to be tested to the laboratory at the designated locations; General Conditions 007200-94 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 h. Provide facilities required to store and cure test Samples; i. Provide calibrated scales and measuring devices for the OPT's use in performing inspections and testing; j. Provide adequate lighting to allow OPT observations; and k. Make Contract Documents available to testing agencies when requested. 5. Provide safe access for all inspection and testing activities, including those to be conducted as part of the OPT's Quality Management Program. 6. Document Defective Work through Certified Test Reports and Defective Work Notices. Document that corrective actions have been taken to correct any defects and that corrected Work is in compliance with the Contract Documents. 7. Apply quality control measures to documentation provided for the Project. 8. Implement countermeasures to prevent future Defective Work. C. Perform tests as indicated in this and other Sections of the Specifications. Technical Specifications govern if any testing and inspection requirements of this Section conflict with the testing and inspection requirements of the technical Specifications. D. All verification testing is to be observed by the OAR or designated representative. E. Send test reports to the OAR and the Designer. F. Provide an update on quality control activities at monthly progress meetings. G. Owner will withhold payment for Defective Work, or Work that has not been tested or inspected in accordance with the Contractor's Quality Control Plan,the OPT's Quality Control Program, or the Contract Documents. H. Owner will withhold payment for additional testing fees incurred due to Contractor noncompliance with OPT's Quality Control Program, including retesting fees, standby time, cancellation charges, and trip fees for retesting or cancellations. I. Work performed that is connected or adjacent to Defective Work or Work that would have to be removed to correct Defective Work is also considered to be Defective. Contractor is responsible for all cost with replacing any acceptable Work that must be removed or might be damaged by corrective actions. 21.02 Quality Management Activities by OPT A. OPT will perform its own quality assurance tests independent of the Contractor's Quality Control Program. Assist the OPT and testing organizations in performing quality assurance activities per Paragraph 21.01. B. Quality assurance testing performed by the OPT will be paid for by the Owner, except for verification testing required per Paragraph 21.07. C. Quality assurance activities of the OPT, through their own forces or through contracts with consultants and materials testing laboratories are for the purpose of monitoring the results of the Contractor's Work to see that it is in compliance with the requirements of the Contract Documents. Quality assurance activities or non-performance of quality assurance activities by the OPT do not: General Conditions 007200-95 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 1. Relieve the Contractor of its responsibility to provide Work or furnish products that conform with the requirements of the Contract Documents; 2. Relieve the Contractor of its responsibility for providing adequate quality control measures; 3. Relieve the Contractor of its responsibility for damage to or loss of Work or products before OPT's acceptance; 4. Constitute or imply OPT's acceptance; and 5. Affect the continuing rights of the Owner after OPT's acceptance of the completed Work. D. Work is subject to OPT's quality assurance observations or testing at any time. Products which have been tested or inspected and approved by OPT at a supply source or staging area may be inspected or tested again by the OPT before, during or after incorporation into the Work and rejected if products do not comply with the Contract Documents. 21.03 Contractor's Use of OPT's Test Reports A. OPT has prepared a Quality Management Plan that describes, in general, the OPT's anticipated quality assurance testing program for this Project. This testing program will be made available to Bidders during the bidding phase. This plan outlines only the testing in general terms and may not reflect actual testing. Actual testing will depend on the Contractors means, methods and procedures of construction which will not be known until the Contractor begins Work and submits their own Quality Control Plan for review. There is no guarantee that all testing will be performed. B. Contractor will receive copies of all test reports documenting OPT's quality assurance activities. Contractor is entitled to rely on the accuracy of these test results and use these as part of their quality control efforts. C. Contractor is to determine additional testing or inspections that may be required to implement the Contractor's Quality Control Plan. Include cost for additional testing and inspections required to meet Contractors quality control obligations, including the cost for correcting Defective Work in the Contract Price. D. Contractor may submit a Change Proposal if OPT's quality assurance testing program deviates significantly from the OPT's Quality Management Plan, and Contractor can demonstrate that additional cost was incurred to implement the Contractor's Quality Control Plan resulting from these deviations. 21.04 Documentation A. Provide documentation which includes: 1. Contractor's Quality Management Plan that establishes the methods of assuring compliance with the Contract Documents. Submit this plan as a Shop Drawings per Article 25. 2. A Statement of Qualification for any proposed testing laboratories that includes a list of the engineers and technical staff that will provide testing services on the Project, descriptions of the qualifications of these individuals, list of tests that can be performed, General Conditions 007200-96 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 equipment used with date of last certification, and a list of recent projects for which testing has been performed with references for those projects. 3. Provide Certified Test Reports for products to be incorporated into the Project. Provide reports to indicate that proposed products comply with the Contract Documents or indicate that proposed products do not comply with the Contract Documents and why it does not comply. Submit these test reports as part of a Shop Drawings submitted per Article 25. 4. Provide Certified Test Reports for inspection and testing required in this Section and in other Specification Sections. Provide reports to indicate that Work complies with the Contract Documents or indicate that Work does not comply with the Contract Documents and why it does not comply. Submit these test reports on forms provided per Article 24. 21.05 Standards A. Provide testing laboratories that comply with the American Council of Independent Laboratories (ACIL) "Recommended Requirements for Independent Laboratory Qualifications." B. Perform testing per recognized test procedures as listed in the various Sections of the Specifications, standards of the State Department of Highways and Public Transportation, American Society of Testing Materials (ASTM), or other testing associations. Perform tests in accordance with published procedures for testing issued by these organizations. 21.06 Delivery and Storage A. Handle and protect test specimens of products and construction materials at the Site in accordance with recognized test procedures. Provide facilities for storing, curing, and processing test specimens as required by test standard to maintain the integrity of Samples. 21.07 Verification Testing for Corrected Defects A. Provide verification testing on Work performed to correct Defective Work to demonstrate that the Work is now in compliance with the Contract Documents. Document that Defective Work has been corrected and verify that the OAR closes the item in the Defective Work Register. B. Pay for verification testing. OPT may perform verification testing as part of their Quality Management Program and impose a Set-off to recover the cost for this testing. C. Conduct the same tests or inspections used to determine that the original Work was Defective. Different tests or methods may be used if approved by the OPT. 21.08 Test Reports A. Certified Test Reports are to be prepared for all tests. 1. Tests performed by testing laboratories may be submitted on their standard test report forms if acceptable to the OPT. These reports must include the following: a. Name of the Owner, Project title and number and Contractor; General Conditions 007200-97 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 b. Name of the laboratory, address, and telephone number; C. Name and signature of the laboratory personnel performing the test; d. Description of the product being sampled or tested; e. Date and time of sampling, inspection, and testing; f. Date the report was issued; g. Description of the test performed; h. Weather conditions and temperature at time of test or sampling; i. Location at the Site or structure where the sample was taken; j. Standard or test procedure used in making the test; k. A description of the results of the test; I. Statement of compliance or non-compliance with the Contract Documents; and m. Interpretations of test results, if appropriate. 2. Submit reports on tests performed by Contractor, Subcontractors or Suppliers on the forms provided by the OAR. 3. OPT will prepare test reports on test performed by the OPT. B. Send test report to Designer within 24 hours of completing the test. Flag tests reports with results that do not comply with Contract Documents for immediate attention. C. Payment for Work may be withheld until test reports indicate that the Work is not Defective. 21.09 Defective Work A. Immediately correct any Defective Work or notify the OAR why the Work is not to be corrected immediately and when corrective action will be completed. B. No payment will be made for Defective Work. Remove Work from the Application for Payment if Work paid for on a previous Application for Payment is found to be Defective. 21.10 Limitation of Authority of Testing Laboratory A. The testing laboratory representatives are limited to providing testing services and interpreting the results of the test performed. B. The testing laboratory is not authorized to: 1. Alter the requirements of the Contract Documents; 2. Accept or reject any portion of the Work; 3. Perform any of the duties of the Contractor; or 4. Direct or stop the Work. 21.11 Quality Control Plan A. Submit the Contractor's Quality Control Plan for approval as a Shop Drawing per Article 25. Use Contractor's Quality Control Plan Checklist provided to review the document before General Conditions 007200-98 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 submitting and include a copy of the completed checklist with the Contractor's Quality Control Plan. Do not begin Work until the Contractor's Quality Control Plan is approved. Submit an interim plan covering only the portion of Work to be performed if the Contractor plans to begin Work prior to submitting the Contractor's Quality Control Plan for the Project. Do not begin Work on other parts of the Project until the Contractor's Quality Control Plan is approved or another interim plan covering the additional Work to be started is approved. B. Provide a Contractor's Quality Control Plan that incorporates construction operations at both the Site and production Work at remote locations and includes Work by Subcontractors and Suppliers. The Contractor's Quality Control Plan is to include: 1. A description of the quality control organization, including an organization chart showing lines of authority to control the quality of Work; 2. Documentation describing name, qualifications (in resume format), duties, responsibilities, and level of authority of the Quality Control Manager; 3. The name, qualifications (in resume format), duties, responsibilities, and authorities of other persons assigned a quality control function; 4. Procedures for scheduling, reviewing, certifying, and managing documentation, including documentation provided by Subcontractors and Suppliers; 5. Control,verification, and acceptance testing procedures for each specific test. Include: a. Name of tests to be performed, b. Specification paragraph requiring test, C. Parameters of Work to be tested, d. Test frequency, e. Persons responsible for each test, and f. Applicable industry testing standards and laboratory facilities to be used for the test; 6. Integrate the OPT quality assurance testing into the Contractor's Quality Control Plan, specifically identifying the tests or inspections in Paragraph 21.11.13.5 that will be provided by the OPT as part of their Quality Management Program; 7. Procedures for tracking and documenting quality management efforts. 8. Procedures for tracking Defective Work from initial identification through acceptable corrective action. Indicate how documentation of the verification process for deficiencies will be made. 9. Reporting procedures which incorporate the use of forms provided by the OAR. 10. The name of the proposed testing laboratories along with documentation of qualifications per Paragraph 21.04. C. The Quality Control Manager must have authority to reject Defective Work and redirect the efforts of the Contractor's Team to prevent or correct Defective Work. D. Notify the Designer of any changes to the Contractor's Quality Control Plan or quality control personnel. General Conditions 007200-99 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 E. Meet with the OPT 7 days after Contractor's Quality Control Plan is submitted and before start of construction to discuss the Contractor's Quality Control Plan and expedite its approval. 21.12 Implement Contractor's Quality Control Plan A. Perform quality control observations and testing as required in each Section of the Specifications and where indicated on the Drawings. B. Include the following phases for each definable Work task. A definable Work task is one which is separate and distinct from other tasks, has separate control requirements, may be provided by different trades or disciplines, or may be Work by the same trade in a different environment. 1. Planning Phase: Perform the following before beginning each definable Work task: a. Review the Contract Drawings. b. Review documents and determine that they are complete in accordance with the Contract Documents. c. Check to assure that all materials and/or equipment have been tested, submitted, and approved. d. Examine the work area to assure that all required preliminary Work has been completed and complies with the Contract Documents. e. Examine required materials, equipment, and Sample Work to assure that they are on hand, conform to Shop Drawings and Record Data, and are properly stored. f. Review requirements for quality control inspection and testing. g. Discuss procedures for controlling quality of the Work. Document construction tolerances and workmanship standards for the Work task. h. Check that the portion of the plan for the Work to be performed incorporates document review comments. i. Discuss results of planning phase with the OAR. Conduct a meeting attended by the Quality Control Manager, the OAR, superintendent, other quality control personnel as applicable, and the foreman responsible for the Work task. Instruct applicable workers as to the acceptable level of workmanship required in order to meet the requirements of the Contract Documents. Document the results of the preparatory phase actions by separate meeting minutes prepared by the Quality Control Manager and attached to the quality control report. j. Do not move to the next phase unless results of investigations required for the planning phase indicate that requirements have been met. 2. Work Phase: Complete this phase after the Planning Phase: a. Notify the OAR at least 24 hours in advance of beginning the Work and discuss the review of the planning effort to indicate that requirements have been met. b. Check the Work to ensure that it is in full compliance with the Contract Documents. General Conditions 007200- 100 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 c. Verify adequacy of controls to ensure full compliance with Contract Documents. Verify required control inspection and testing is performed. d. Verify that established levels of workmanship meet acceptable workmanship standards. Compare with required Sample panels as appropriate. e. Repeat the Work phase for each new crew to work on-site, or any time acceptable specified quality standards are not being met. 3. Follow-up Phase: Perform daily checks to assure control activities, including control testing, are providing continued compliance with contract requirements: a. Make checks daily and record observations in the quality control documentation. b. Conduct follow-up checks and correct all deficiencies prior to the start of additional Work tasks that may be affected by the Defective Work. Do not build upon nor conceal Defective Work. c. Conduct a review of the Work with the OPT one month prior to the expiration of the correction period. Correct defects as noted during the review. C. Conduct additional planning and Work phases if: 1. The quality of on-going Work is unacceptable; 2. Changes are made in applicable quality control staff, on-site production supervision or crews; 3. Work on a task is resumed after a substantial period of inactivity; or 4. Other quality problems develop. ARTICLE 22—FINAL RESOLUTION OF DISPUTES 22.01 Senior Level Negotiations A. Each party is required to continue to perform its obligations under the Contract pending the final resolution of any dispute arising out of or relating to the Contract, unless it would be impossible or impracticable under the circumstances then present. B. All negotiations pursuant to Article 22 are confidential and shall be treated as compromise and settlement negotiations for purposes of applicable rules of evidence. C. Before invoking mediation, Owner and Contractor agree that they first shall try to resolve any dispute arising out of or related to this Contract through discussions directly between those senior management representatives within their respective organizations who have overall managerial responsibility for similar projects. Both Owner and Contractor agree that this step shall be a condition precedent to use of any other alternative dispute resolution process. If the parties' senior management representatives cannot resolve the dispute within 45 calendar days after a party delivers a written notice of such dispute to the other, then the parties shall proceed with mediation. 22.02 Mediation A. In the event that Owner and/or Contractor contend that the other has committed a material breach of the Contract or the parties cannot reach a resolution of a claim or dispute pursuant General Conditions 007200- 101 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 to Article 13, as a condition precedent to filing a lawsuit, either party shall request mediation of the dispute with the following requirements: 1. The request for mediation shall be in writing and shall request that the mediation commence not less than 30 calendar days or more than 90 calendar days following the date of the request, except upon agreement of the parties. 2. In the event Owner and Contractor are unable to agree to a date for the mediation or to the identity of the mediator within 30 calendar days following the date of the request for mediation, all conditions precedent shall be deemed to have occurred. 3. Owner and Contractor are to each pay one-half of the mediator's fees and costs. Venue for any mediation or lawsuit filed under this Contract shall be in Nueces County, Texas. Any agreement reached in mediation shall be enforceable as a settlement in any court having jurisdiction thereof. 4. Nothing in this Contract shall be construed as consent to a lawsuit. No provision of the Contract shall waive any immunity or defense. ARTICLE 23—MINORITY/MBE/DBE PARTICIPATION POLICY 23.01 Policy A. It is the policy of the City of Corpus Christi that maximum opportunity is afforded minorities, women, low income persons and Minority/Disadvantaged Business Enterprises (M/DBE) to participate in the performance of contracts awarded by the City of Corpus Christi in support of Equal Employment Opportunity goals and objectives. In accordance with such policy,the City has established goals, as stated herein, both for minority and female participation by trade and for Minority Business Enterprise. 23.02 Definitions A. Prime Contractor: Any person, firm, partnership, corporation, association, or joint venture as herein provided which has been awarded a City contract. B. Subcontractor: Any named person, firm, partnership, corporation, association, or joint venture herein identified as providing work, labor, services, supplies, equipment, materials, or any combination of the foregoing under contract with a prime contractor on a City contract. C. Minority/Disadvantaged Business Enterprise: A business enterprise that is owned and controlled by one or more minority person(s) or socially and economically disadvantaged individual(s). Minority/Disadvantaged person(s) must collectively own, operate and/or actively manage, and share in payments from such an enterprise in the manner hereinafter set forth: 1. Owned: a. For a sole proprietorship to be deemed a minority business enterprise, it must be owned by a minority person. b. For an enterprise doing business as a partnership, at least 51 percent of the assets or interest in the partnership property must be owned by one or more minority person(s). General Conditions 007200- 102 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 C. For an enterprise doing business as a corporation, at least 51 percent of the assets or interest in the corporate shares must be owned by one or more minority person(s). 2. Controlled: a. The primary power, direct or indirect,to manage a business enterprise rests with a minority person(s). 3. Share in Payments: a. Minority partners, proprietors, or stockholders of the business enterprise must be entitled to receive 51 percent or more of the total profits, bonuses, dividends, interest payments, commissions, consulting fees, rents, procurement, and subcontract payments, and any other monetary distribution paid by the business enterprise. D. Minority: Minority persons include Blacks, Mexican-Americans and other persons of Hispanic origin, American Indians, Alaskan Natives, and Asians or Pacific Islanders. For the purposes of this policy,women are also considered as minorities. E. Socially and economically disadvantaged individual: Any individual who is a citizen (or lawfully admitted permanent resident) of the United States and who has been subjected to racial or ethnic prejudice or cultural bias within American society because of his or her identity as a member of a group and without regard to his or her individual qualities. The social disadvantage must stem from circumstances beyond the individual's control. F. Female Owned Business Enterprise: A sole proprietorship that is owned and controlled by a woman,a partnership at least 51 percent of whose assets or partnership interests are owned by one or more women, or a corporation at least 51 percent of whose assets or interests in the corporate shares are owned by one or more women. G. Joint Venture: A joint venture means an association of two or more persons, partnerships, corporations, or any combination thereof, founded to carry on a single business activity which is limited in scope and direction. The degree to which a joint venture may satisfy the stated MBE goal cannot exceed the proportionate interest of the MBE as a member of the joint venture in the Work to be performed by the joint venture. For example,a joint venture which is to perform 50 percent of the Work itself and in which a minority joint venture partner has a 50 percent interest, shall be deemed equivalent to having minority participation in 25 percent of the Work. Minority members of the joint venture must have financial, managerial, or technical skills in the Work to be performed by the joint venture. 23.03 Goals A. The goals for participation by minorities and Minority Business Enterprises expressed in percentage terms for the Contractor's aggregate work force on all construction Work for the Contract award shall be 1. Minority participation goal is 45%. 2. Minority Business Enterprise participation goal is 15%. B. These goals are applicable to all the construction work (regardless of federal participation) performed in the Contract, including approved Change Orders. The hours of minority General Conditions 007200- 103 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 employment must be substantially uniform throughout the length of the Contract and in each trade. The transfer of minority employees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's percentage is prohibited. 23.04 Compliance A. Upon completion of the Project, a final breakdown of MBE participation, substantiated by copies of paid invoices, shall be submitted by the Contractor to the City Engineer. B. Make bi-weekly payroll submittals to the City Engineer. The Contractor is to indicate the percent of minority and female participation, by trade, which has been utilized on the Project. Along with the request for final payment on the Project,the Contractor will indicate, in writing, the overall participation in these areas which have been achieved. The City Engineer may withhold monthly or final payments to the Contractor for failure to submit bi- weekly payrolls in a timely fashion or to submit overall participation information as required. ARTICLE 24—DOCUMENT MANAGEMENT 24.01 Work Included A. Submit documentation as required by the Contract Documents and as reasonably requested by the OPT. 24.02 Quality Assurance A. Submit legible, accurate, complete documents presented in a clear, easily understood manner. Documents not meeting these criteria will be returned without review. 24.03 Contractor's Responsibilities A. Review documents prior to submitting. Make certifications as required by the Contract Documents and as indicated on forms provided. B. Provide a Schedule of Documents to list the documents that are to be submitted, the dates on which documents are to be sent to the Designer for review, and proposed dates that documents must be returned to comply with the Project schedule. Use the form provided for this list. C. Incorporate the dates for processing documents into the Progress Schedule required by Article 27. 1. Provide documents in accordance with the schedule so construction of the Project is not delayed. 2. Allow a reasonable time for the review of documents when preparing the Progress Schedule. Assume a 14 day review cycle for each document unless a longer period of time is indicated in the Contract Documents or agreed to by Designer and Contractor. 3. Schedule submittal of documents to provide all information for interrelated Work at one time. 4. Allow adequate time for processing documents so construction of the Project is not delayed. General Conditions 007200- 104 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 24.04 Document Submittal A. Submit documents through the Designer. Send all documents in digital format for processing. 1. Provide all information requested with a completed Document Transmittal form. Do not leave any blanks incomplete. If information is not applicable, enter NA in the space provided. 2. The Document Transmittal form is to be the first page in the document submitted. 3. Submit all documents in Portable Document Format (PDF). a. Create PDF documents from native format files unless files are only available from scanned documents. b. Rotate pages so that the top of each document appears at the top of the monitor screen when opened in PDF viewing software. c. Submit PDF document with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. d. Submit color PDF documents where color is required to interpret the document. e. Create or convert documents to allow text to be selected for comments or searched using text search features. Run scanned documents through Optical Character Recognition (OCR) software if necessary. f. Flatten markups in documents to prevent markups made by Contractor from being moved or deleted. Flatten documents to allow markup recovery. g. Use software to reduce file size using default settings except the option for "Drop Metadata." Uncheck the "Drop Metadata" box when reducing file size. h. Add footers to each document with the Project name. 24.05 Document Numbering A. Assign a number to the documents originated to allow tracking of the documents during the review process. 1. Assign the number consisting of a prefix, a sequence number, and a letter suffix. Prefixes shall be as follows: Prefix Description Originator AP Application for Payment Contractor CO Change Order OAR CP Change Proposal Contractor CTR Certified Test Report Contractor FO Field Order OAR NBC Notification by Contractor Contractor PD Photographic Documentation Contractor General Conditions 007200- 105 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Prefix Description Originator RCP Request for a Change Proposal OAR RD Record Data Contractor RFI Request for Information Contractor SD Shop Drawing Contractor SCH Schedule of Progress Contractor 2. Issue sequence numbers in chronological order for each type of document. 3. Issue numbers for resubmittals that have the same number as the original document followed by an alphabetical suffix indicating the number of times the same document has been sent to the Designer for processing. For example: SD 025 A represents Shop Drawing number 25 and the letter "A" designates that this is the second time this document has been sent for review. 4. Clearly note the document number on each page or sheet of the document. 5. Correct assignment of numbers is essential since different document types are processed in different ways. B. Include reference to the Drawing number and/or Specification Section, detail designation, schedule, or location that corresponds with the data on the document transmittal forms. Other identification may also be required, such as layout drawings or schedules to allow the reviewer to determine where a particular product is to be used. 24.06 Document Requirements A. Furnish documents as indicated below or in individual Specification Sections. Submit documents per the procedures described in the Contract Documents. B. Submit documents per the Specification Section shown in the following table: Document Type Section Application for Payment Article 17 Change Proposal Article 12 Certified Test Report Article 25 for approval of product Article 21 to demonstrate compliance Notification by Contractor Article 20 Photographic Documentation Article 28 Progress Schedules Article 27 Record Data Article 26 Request for Information Article 20 Shop Drawing Article 25 Schedule of Values Article 17 Substitutions Article 12 General Conditions 007200- 106 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Document Type Section Suppliers and Subcontractors Articles 20 and 26 ARTICLE 25—SHOP DRAWINGS 25.01 Work Included A. Shop Drawings are required for those products that cannot adequately be described in the Contract Documents to allow fabrication, erection, or installation of the product without additional detailed information from the Supplier. B. Submit Shop Drawings as required by the Contract Documents and as reasonably requested by the OPT to: 1. Record the products incorporated into the Project for the Owner; 2. Provide detailed information for the products proposed for the Project regarding their fabrication, installation, commissioning, and testing; and 3. Allow the Designer to advise the Owner if products proposed for the Project by the Contractor conform, in general, to the design concepts of the Contract Documents. C. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the review of Shop Drawings, Samples, or mockups. Contract modifications can only be approved by Change Order or Field Order. 25.02 Quality Assurance A. Submit legible, accurate, and complete documents presented in a clear, easily understood manner. Shop Drawings not meeting these criteria will be rejected. B. Demonstrate that the proposed products are in full and complete compliance with the design criteria and requirements of the Contract Documents or will be if deviations requested per Paragraph 25.10 are approved. C. Furnish and install products that fully comply with the information included in the document submittal. 25.03 Contractor's Responsibilities A. Provide Shop Drawings as required by Paragraph 25.03 of the Supplementary Conditions. B. Include Shop Drawings in the Schedule of Documents required by Article 24 to indicate the Shop Drawings to be submitted,the dates on which documents are to be sent to the Designer for review and proposed dates that the product will be incorporated into the Project. C. Incorporate the dates for processing Shop Drawings into the Progress Schedule required by Article 27. 1. Submit Shop Drawings in accordance with the schedule so construction of the Project is not delayed. 2. Allow a reasonable time for the review of Shop Drawings when preparing the Progress Schedule. Include time for making revisions to the Shop Drawings and resubmitting the Shop Drawing for a least a second review. Assume a 14-day review cycle for each time General Conditions 007200- 107 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 a Shop Drawing is submitted for review unless a longer period of time is indicated in the Contract Documents. 3. Schedule document submittals to provide all information for interrelated Work at one time. 4. Allow adequate time for ordering, fabricating, delivering, and installing product so construction of the Project is not delayed. D. Complete the following before submitting a Shop Drawing or Sample: 1. Prepare Shop Drawing Review and coordinate the Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents; 2. Determine and verify specified performance and design criteria, installation requirements, materials,catalog numbers,and similar information with respect to Shop Drawings and Samples; 3. Determine and verify the suitability of materials and equipment offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and 4. Determine and verify information relative to Contractor's responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto. E. Determine and verify: 1. Accurate field measurements, quantities, and dimensions are shown on the Shop Drawings; 2. Location of existing structures, utilities, and equipment related to the Shop Drawing have been shown and conflicts between the products existing structures, utilities, and equipment have been identified; 3. Conflicts that impact the installation of the products have been brought to the attention of the OPT through the Designer; 4. Shop Drawings are complete for their intended purpose; and 5. Conflicts between the Shop Drawings related to the various Subcontractors and Suppliers have been resolved. F. Review Shop Drawings prior to submitting to the Designer. Certify that all Shop Drawings have been reviewed by the Contractor and are in strict conformance with the Contract Documents as modified by Addenda, Change Order, Field Order, or Contract Amendment when submitting Shop Drawings except for deviations specifically brought to the Designer's attention on an attached Shop Drawing Deviation Request form in accordance with Paragraph 25.09. G. Fabrication or installation of any products prior to the approval of Shop Drawings is done at the Contractor's risk. Defective products may be rejected at the Owner's option. H. Payment will not be made for products for which Shop Drawings or Samples are required until these are approved by the Designer. General Conditions 007200- 108 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 25.04 Shop Drawing Requirements A. Provide adequate information in Shop Drawings and Samples so Designer can: 1. Assist the Owner in selecting colors, textures, or other aesthetic features. 2. Compare the proposed features of the product with the specified features and advise Owner that the product does, in general, conform to the Contract Documents. 3. Compare the performance features of the proposed product with those specified and advise the Owner that the product does, in general,conform to the performance criteria specified in the Contract Documents. 4. Review required certifications, guarantees, warranties, and service agreements for compliance with the Contract Documents. B. Include a complete description of the product to be furnished, including: 1. Type, dimensions, size, arrangement, and operational characteristics of the product; 2. Weights,gauges, materials of construction,external connections,anchors,and supports required; 3. All applicable standards such as ASTM or Federal specification numbers; 4. Fabrication and installation drawings, setting diagrams, manufacturing instructions, templates, patterns, and coordination drawings; 5. Mix designs for concrete, asphalt, or other materials proportioned for the Project; and 6. Complete and accurate field measurements for products which must fit existing conditions. Indicate on the document submittal that the measurements represent actual dimensions obtained at the Site. C. Submit Shop Drawings that require coordination with other Shop Drawings at the same time. Shop Drawings requiring coordination with other Shop Drawings will be rejected until a complete package is submitted. 25.05 Special Certifications and Reports A. Provide all required certifications with the Shop Drawings as specified in the individual Specification Sections: 1. Certified Test Reports (CTR): A report prepared by an approved testing agency giving results of tests performed on products to indicate their compliance with the Specifications. This report is to demonstrate that the product when installed will meet the requirements and is part of the Shop Drawing. Field tests may be performed by the Owner to determine that in place materials or products meet the same quality as indicated in the CTR submitted as part of the Shop Drawing. 2. Certification of Local Field Service (CLS): A certified letter stating that field service is available from a factory or supplier approved service organization located within a 300 mile radius of the Site. List names, addresses, and telephone numbers of approved service organizations on or attach it to the certificate. 3. Certification of Adequacy of Design (CAD): A certified letter from the manufacturer of the equipment stating that they have designed the equipment to be structurally stable General Conditions 007200- 109 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 and to withstand all imposed loads without deformation, failure, or adverse effects to the performance and operational requirements of the unit. The letter shall state that mechanical and electrical equipment is adequately sized to be fully operational for the conditions specified or normally encountered by the product's intended use. 25.06 Warranties and Guarantees A. Provide all required warranties, guarantees, and related documents with the Shop Drawing. The effective date of warranties and guarantees will be the date of acceptance of the Work by the Owner. B. Identify all Extended Warranties, defined as any guarantee of performance for the product or system beyond the 1-year correction period described in the General Conditions. Issue the warranty certificate in the name of the Owner. Provide a Warranty Bond for Extended Warranties if required by Specification Sections. C. Provide a copy of all warranties in a separate document in accordance with Article 29. 25.07 Shop Drawing Submittal Procedures A. Submit Shop Drawings through the Designer. Send all documents in digital format for processing. 1. Provide all information requested in the Shop Drawing submittal form. Do not leave any blanks incomplete. If information is not applicable,enter NA in the space provided. The Shop Drawing submittal form is to be the first document in the file submitted. 2. Submit all documents in Portable Document Format(PDF). a. Create PDF documents from native format files unless files are only available from scanned documents. b. Rotate pages so that the top of each document appears at the top of the monitor screen when opened in PDF viewing software. c. Submit PDF document with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. d. Submit color PDF documents where color is required to interpret the Shop Drawing. Submit Samples and color charts per Paragraph 25.08.A. e. Create or convert documents to allow text to be selected for comments or searched using text search features. Run scanned documents through Optical Character Recognition (OCR) software if necessary. f. Flatten markups in documents to prevent markups made by Contractor from being moved or deleted. Flatten documents to allow markup recovery. g. Use software to reduce file size using default settings except the option for "Drop Metadata." Uncheck the "Drop Metadata" box when reducing file size. h. Add footers to each document with the Project name. General Conditions 007200- 110 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 3. Submit each specific product or class of material separately so these can be tracked and processed independently. Do not submit Shop Drawings for more than one product in the same Shop Drawing. 4. Submit items specified in different Specification Sections separately unless they are part of an integrated system. 5. Define abbreviations and symbols used in Shop Drawings. a. Use terms and symbols in Shop Drawings consistent with the Contract Drawings. b. Provide a list of abbreviations and their meaning as used in the Shop Drawings. C. Provide a legend for symbols used on Shop Drawings. 6. Mark Shop Drawings to reference: a. Related Specification Sections, b. Drawing number and detail designation, C. Product designation or name, d. Schedule references, e. System into which the product is incorporated, and f. Location where the product is incorporated into the Project. B. Use the following conventions to markup Shop Drawings for review: 1. Make comments and corrections in the color blue. Add explanatory comments to the markup. 2. Highlight items in black that are not being furnished when the Supplier's standard drawings or information sheets are provided so that only the products to be provided are in their original color. 3. Make comments in the color yellow where selections or decisions by the Designer are required, but such selections do not constitute a deviation from the Contract Documents. Add explanatory comments to the markup to indicate the action to be taken by the Designer. 4. Make comments in the color orange that are deviation requests. Include the deviation request number on the Shop Drawing that corresponds to the deviation request on the Shop Drawing Deviation Request form. Include explanatory comments in the Shop Drawing Deviation Request form. 5. Mark dimensions with the prefix FD to indicate field verified dimensions on the Shop Drawings. C. Submit a Change Proposal per Article 12 to request modifications to the Contract Documents, including those for approval of"or equal"products when specifically allowed by the Contract Documents or as a substitution for specified products or procedures. D. Designate a Shop Drawing as requiring priority treatment in the comment section of the Shop Drawing submittal form to place the review of the Shop Drawing ahead of other Shop Drawings previously delivered. Shop Drawings are typically reviewed in the order received, unless Contractor requests that a different priority be assigned. Priority Shop Drawings will General Conditions 007200- 111 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 be reviewed before other Shop Drawings for this Project already received but not yet reviewed. Use of this priority designation for Shop Drawings may delay the review of Shop Drawings previously submitted, pushing the processing of Shop Drawings beyond the 14-day target. Contractor is responsible for delays resulting from the use of the priority designation status on Shop Drawings. E. Complete the certification required by Paragraph 25.03. 25.08 Sample and Mockup Submittal Procedures A. Submit color charts and Samples for every product requiring color, texture, or finish selection. 1. Submit color charts and Samples only after Shop Drawings for the products have been approved. 2. Deliver all color charts and Samples at one time. 3. Provide Samples of adequate size to clearly illustrate the functional characteristics of the product, with integrally related parts and attachment devices. 4. Indicate the full range of color, texture, and patterns. 5. Deliver color charts and Samples to the field office and store for the duration of the Project 6. Notify the Designer that color charts and Samples have been delivered for approval using the Notification by Contractor form. 7. Submit color charts and Samples not less than 30 days prior to when these products are to be ordered or released for fabrication to comply with the Project schedule. 8. Remove Samples that have been rejected. Submit new Samples following the same process as for the initial Sample until Samples are approved. 9. Dispose of Samples when related Work has been completed and approved and disposal is approved by the Designer. At Owner's option, Samples will become the property of the Owner. B. Construct mockups for comparison with the Work being performed. 1. Construct mockups from the actual products to be used in construction per detailed Specification Sections. 2. Construct mockups of the size and in the area indicated in the Contract Documents. 3. Construct mockups complete with texture and finish to represent the finished product. 4. Notify the Designer that mockups have been constructed and are ready for approval using the Notification by Contractor form. Allow 2 weeks for OPT to approve of the mockup before beginning the Work represented by the mockup. 5. Remove mockups that have been rejected. Construct new mockups following the same process as for the initial mockup until mockup is approved. 6. Protect mockups until Work has been completed and accepted by the OPT. General Conditions 007200- 112 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 7. Dispose of mockups when related Work has been completed and disposal is approved by the Designer. 25.09 Equal Non Specified Products A. Contractor may submit other manufacturers' products that are in full compliance with the Specification where Specifications list one or more manufacturers followed by the phase "or equal" or"or approved equal." 1. Submit a Shop Drawing as required by this article to document that the proposed product is equal or superior to the specified product. 2. Prove that the product is equal. It is not the OPT's responsibility to prove the product is not equal. a. Indicate on a point by point basis for each specified feature that the product is equal to the Contract Document requirements. b. Make a direct comparison with the specified manufacturer's published data sheets and available information. Provide this printed material with the Shop Drawing. c. The decision of the Designer regarding the acceptability of the proposed product is final. 3. Provide a typewritten certification that, in furnishing the proposed product as an equal, the Contractor: a. Has thoroughly examined the proposed product and has determined that it is equal or superior in all respects to the product specified. b. Has determined that the product will perform in the same manner and result in the same process as the specified product. c. Will provide the same warranties and/or bonds as for the product specified. d. Will assume all responsibility to coordinate any modifications that may be necessary to incorporate the product into the construction and will waive all claims for additional Work which may be necessary to incorporate the product into the Project which may subsequently become apparent. e. Will maintain the same time schedule as for the specified product. 25.10 Requests for Deviation A. Submit requests for deviation from the Contract Documents for any product that does not fully comply with the Contract Documents. B. Submit requests for deviation using the Shop Drawing Deviation Request form provided. Identify each deviation request as a separate item. Include all requested deviations that must be approved as a group together and identify them as a single item. C. Include a description of why the deviation is required and the impact on Contract Price or Contract Times. Include the amount of any cost savings to the Owner for deviations that result in a reduction in cost. D. Submit as a Change Proposal prior to submitting the Shop Drawing if the deviation will result in a change in Contract Price or Contract Times. General Conditions 007200- 113 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 E. A Modification must be issued by the Designer for approval of a deviation. Approval of a requested Shop Drawing deviation by the Designer on the Shop Drawings Deviation Request form indicates approval of the requested deviation only on its technical merits as generally conforming to the Contract Documents. Deviations from the Contract Documents can only be approved by a Modification. 25.11 Designer Responsibilities A. Shop Drawings will be received by the Designer. Designer will log the documents and review per this Article for general conformance with the Contract Documents. 1. Designer's review and approval will be only to determine if the products described in the Shop Drawing or Sample will, after installation or incorporation into the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. Designer's review and approval will not extend to means, methods, techniques, sequences, or procedures of construction or to safety precautions or programs incident thereto. 3. Designer's review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. B. Comments will be made on items called to the attention of the Designer for review and comment. Any marks made by the Designer do not constitute a blanket review of the document submittal or relieve the Contractor from responsibility for errors or deviations from the Contract requirements. 1. Designer will respond to Contractor's markups by either making markups directly in the Shop Drawings file using the color green or by attaching a Document Review Comments form with review comments. 2. Shop Drawings that are reviewed will be returned with one or more of the following status designations: a. Approved: Shop Drawing is found to be acceptable as submitted. b. Approved as Noted: Shop Drawing is Approved so long as corrections or notations made by Designer are incorporated into the Show Drawing. C. Not Approved: Shop Drawing or products described are not acceptable. 3. Shop Drawing will also be designated for one of the following actions: a. Final distribution: Shop Drawing is acceptable without further action and has been filed as a record document. b. Shop Drawing not required: A Shop Drawing was not required by the Contract Documents. Resubmit the document per Article 26. c. Cancelled: This action indicates that for some reason, the Shop Drawing is to be removed from consideration and all efforts regarding the processing of that document are to cease. General Conditions 007200- 114 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 d. Revise and resubmit: Shop Drawing has deviations from the Contract Documents, significant errors, or is inadequate and must be revised and resubmitted for subsequent review. e. Resubmit with corrections made: Shop Drawing is "Approved as Noted," but has significant markups. Make correction and notations to provide a revised document with markup incorporated into the original document so that no markups are required. f. Returned without review due to excessive deficiencies: Document does not meet the requirement of the Specifications for presentation or content to the point where continuing to review the document would be counterproductive to the review process or clearly does not meet the requirements of the Contract Documents. Revise the Shop Drawing to comply with the requirements of this Section and resubmit. g. Actions a through c will close out the Shop Drawing review process and no further action is required as a Shop Drawing. Actions d through f require follow up action to close out the review process. 4. Drawings with a significant or substantial number of markings by the Contractor may be marked "Approved as Noted" and "Resubmit with corrections made." These drawings are to be revised to provide a clean record of the Shop Drawing. Proceed with ordering products as the documents are revised. 5. Dimensions or other data that does not appear to conform to the Contract Documents will be marked as "At Variance With" (AVW) the Contract Documents or other information provided. The Contractor is to make revisions as appropriate to comply with the Contract Documents. C. Bring deviations to the Shop Drawings to the attention of the Designer for approval by using the Shop Drawing Deviation Request form. Use a single line for each requested deviation so the Status and Action for each deviation can be determined for that requested deviation. If approval or rejection of a requested deviation will impact other requested deviations, then all related deviations should be included in that requested deviation line so the status and action can be determined on the requested deviation as a whole. D. Requested deviations will be reviewed as possible Modification to the Contract Documents. 1. A Requested deviation will be rejected as "Not Approved" if the requested deviation is unacceptable. Contractor is to revise and resubmit the Shop Drawing with corrections for approval. 2. A Field Order will be issued by the Designer for deviations approved by the Designer if the requested deviation is acceptable and if the requested deviation will not result in a change in Contract Price or Contract Times. Requested deviations from the Contract Documents may only be approved by Field Order. 3. A requested deviation will be rejected if the requested deviation is acceptable but the requested deviation will or should result in a change in Contract Price or Contract Times. Submit any requested deviation that requires a change in Contract Price or Contract Times as a Change Proposal for approval prior to resubmitting the Shop Drawing. General Conditions 007200- 115 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 E. Contractor is to resubmit the Shop Drawing until it is acceptable and marked Approved or Approved as Noted and is assigned an action per Paragraph 25.11 that indicates that the Shop Drawing process is closed. F. Information that is submitted as a Shop Drawings that should be submitted as Record Data or other type of document, or is not required may be returned without review, or may be deleted. No further action is required and the Shop Drawing process for this document will be closed. 25.12 Resubmission Requirements A. Make all corrections or changes in the documents required by the Designer and resubmit to the Designer until approved. 1. Revise initial drawings or data and resubmit as specified for the original document. 2. Highlight or cloud in green those revisions which have been made in response to the previous reviews by the Designer. This will include changes previously highlighted or clouded in yellow to direct attention to Designer to items requiring selections or decisions by the Designer or highlighted or clouded in orange for a requested deviation from the Contract Documents. 3. Highlight and cloud new items in yellow where selections or decisions by the Designer are required, but such selections do not constitute a deviation from the Contract Documents. Add explanatory comments to the markup to indicate the action to be taken by the Designer. 4. Highlight and cloud new items in orange that are deviation requests. Include the deviation request number on the Shop Drawing that corresponds to the deviation request on the Shop Drawing Deviation Request form. Numbering for these new items is to start with the next number following the last Shop Drawing deviation requested. Include explanatory comments in the Shop Drawing Deviation Request form. B. Pay for excessive review of Shop Drawings. 1. Excessive review of Shop Drawings is defined as any review required after the original review has been made and the first resubmittal has been checked to see that corrections have been made. 2. Review of Shop Drawings or Samples will be an additional service requiring payment by the Contractor if the Contractor submits a substitution for a product for which a Shop Drawing or Sample has previously been approved, unless the need for such change is beyond the control of Contractor. 3. Cost for additional review time will be billed to the Owner by the Designer for the actual hours required for the review of Shop Drawings by Designer and in accordance with the rates listed in SECTION 00 73 00 SUPPLEMENTARY CONDITIONS. 4. A Set-off will be included in each Application for Payment to pay costs for the additional review to the Owner on a monthly basis. The Set-off will be based on invoices submitted to Owner for these services. General Conditions 007200- 116 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 5. Need for more than one resubmission or any other delay of obtaining Designer's review of Shop Drawings will not entitle the Contractor to an adjustment in Contract Price or an extension of Contract Times. ARTICLE 26—RECORD DATA 26.01 Work Included A. Submit Record Data as required by the Contract Documents and as reasonably requested by the OPT. Provide Record Data for all products unless a Shop Drawing is required for the same item. B. Submit Record Data to provide documents that allow the Owner to: 1. Record the products incorporated into the Project for the Owner; 2. Review detailed information about the products regarding their fabrication, installation, commissioning, and testing; and 3. Provide replacement or repair of the products at some future date. C. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the receipt or cursory review of Record Data. Contract modifications can only be approved by Change Order or Field Order. D. Provide various reports or other documents that Contract Documents require for record purposes. 26.02 Quality Assurance A. Submit legible, accurate, and complete documents presented in a clear, easily understood manner. Record Data not meeting these criteria will be rejected. 26.03 Contractor's Responsibilities A. Submit Record Data in accordance with SECTION 00 73 00 SUPPLEMENTARY CONDITIONS. B. Include Record Data in the Schedule of Documents required by Article 24 to indicate the Record Data to be submitted, the dates on which documents are to be sent to the Designer for review, and proposed dates that the product will be incorporated into the Project. C. Complete the following before submitting Record Data: 1. Prepare Record Data and coordinate with Shop Drawings or Samples, other Record Data, and with the requirements of the Work and the Contract Documents; 2. Determine and verify specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information; 3. Determine and verify the suitability of materials and equipment offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and 4. Determine and verify information relative to Contractor's responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto. General Conditions 007200- 117 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 D. Determine and verify: 1. Accurate field measurements, quantities, and dimensions are shown on the Record Data; 2. Location of existing structures, utilities, and equipment related to the Record Data have been shown and conflicts between the products existing structures, utilities, and equipment have been identified; 3. Conflicts that impact the installation of the products have been brought to the attention of the OPT through the Designer; 4. Record Data are complete for their intended purpose; and 5. Conflicts between the Record Data related to the various Subcontractors and Suppliers have been resolved. E. Review Record Data prior to submitting to the Designer. Certify that all Record Data has been reviewed by the Contractor and is in strict conformance with the Contract Documents as modified by Addenda, Change Order, Field Order, or Contract Amendment when submitting Record Data. 26.04 Record Data Requirements A. Include a complete description of the material or equipment to be furnished, including: 1. Type,dimensions,size,arrangement, model number,and operational parameters of the components; 2. Weights,gauges, materials of construction,external connections,anchors,and supports required; 3. All applicable standards such as ASTM or Federal specification numbers; 4. Fabrication and installation drawings, setting diagrams, manufacturing instructions, templates, patterns, and coordination drawings; 5. Mix designs for concrete, asphalt or other materials proportioned for the Project; and 6. Complete and accurate field measurements for products which must fit existing conditions. Indicate on the document submittal that the measurements represent actual dimensions obtained at the Site. 26.05 Special Certifications and Reports A. Provide all required certifications with the Record Data as specified in the individual Specification Sections: 1. Certified Test Reports (CTR): A report prepared by an approved testing agency giving results of tests performed on products to indicate their compliance with the Specifications. This report is to demonstrate that the product when installed will meet the requirements and is part of the Record Data. Field tests may be performed by the Owner to determine that in place materials or products meet the same quality as indicated in the CTR submitted as part of the Record Data. General Conditions 007200- 118 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 26.06 Warranties and Guarantees A. Provide all required warranties, guarantees, and related documents with the Record Data. The effective date of warranties and guarantees will be the date of acceptance of the Work by the Owner. B. Identify all Extended Warranties, defined as any guarantee of performance for the product or system beyond the 1 year correction period described in the General Conditions. Issue the warranty certificate in the name of the Owner. Provide a Warranty Bond for Extended Warranties if required. C. Provide a copy of all warranties in a separate document in accordance with Article 29. 26.07 Record Data Submittal Procedures A. Submit Record Data through the Designer. Send all documents in digital format for processing. 1. Provide all information requested in the Record Data submittal form. Do not leave any blanks incomplete. If information is not applicable,enter NA in the space provided. The Record Data submittal form is to be the first document in the file. 2. Submit all documents in Portable Document Format (PDF). a. Create PDF documents from native format files unless files are only available from scanned documents. b. Rotate pages so that the top of each document appears at the top of the monitor screen when opened in PDF viewing software. c. Submit PDF document with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. d. Submit color PDF documents where color is required to interpret the Record Data. e. Create or convert documents to allow text to be selected for comments or searched using text search features. Run scanned documents through Optical Character Recognition (OCR) software if necessary. f. Flatten markups in documents to prevent markups made by Contractor from being moved or deleted. Flatten documents to allow markup recovery. g. Use software to reduce file size using default settings except the option for "Drop Metadata." Uncheck the "Drop Metadata" box when reducing file size. h. Add footers to each document with the Project name. 3. Submit each specific product, class of material, or product separately so these can be tracked and processed independently. Do not submit Record Data for more than one system in the same Record Data. 4. Submit items specified in different Specification Sections separately unless they are part of an integrated system. 5. Define abbreviations and symbols used in Record Data. General Conditions 007200- 119 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 a. Use terms and symbols in Record Data consistent with the Contract Drawings. b. Provide a list of abbreviations and their meaning as used in the Record Data. C. Provide a legend for symbols used on Record Data. 6. Mark Record Data to reference: a. Related Specification Sections, b. Drawing number and detail designation, C. Product designation or name, d. Schedule references, e. System into which the product is incorporated, and f. Location where the product is incorporated into the Project. B. Submit a Change Proposal per Article 12 to request modifications to the Contract Documents, including those for approval of"or equal"products when specifically allowed by the Contract Documents or as a substitution for specified products or procedures. Deviations from the Contract Documents can only be approved by a Modification. C. Complete the certification required by Paragraph 26.03. 26.08 Designer's Responsibilities A. Record Data will be received by the Designer, logged, and provided to Owner as the Project record. 1. Record Data may be reviewed to see that the information provided is adequate for the purpose intended. Record Data not meeting the requirements of Paragraph 26.02 may be rejected as unacceptable. 2. Record Data is not reviewed for compliance with the Contract Documents. Comments may be returned if deviations from the Contract Documents are noted during the cursory review performed to see that the information is adequate. 3. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the review of Record Data. Contract modifications can only be approved by a Modification. B. Designer may take the following action in processing Record Data: 1. File Record Data as received if the cursory review indicates that the document meets the requirements of Paragraph 26.02. Document will be given the status of "Filed as Received" and no further action is required on that Record Data. 2. Reject the Record Data for one of the following reasons: a. The document submittal requirements of the Contract Documents indicate that the document submitted as Record Data should have been submitted as a Shop Drawing. The Record Data will be marked "Rejected" and "Submit Shop Drawing." No further action is required on this document as Record Data and the Record Data process will be closed. Resubmit the document as a Shop Drawing per Article 25. General Conditions 007200- 120 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 b. The cursory review indicates that the document does not meet the requirements of Paragraph 26.02. The Record Data will be marked "Rejected" and "Revise and Resubmit." Contractor is to resubmit the Record Data until it is acceptable and marked "Filed as Received." When Record Data is filed, no further action is required, and the Record Data process will be closed. c. The Record Data is not required by the Contract Documents nor is the Record Data applicable to the Project. The Record Data will be marked "Rejected" and "Cancel - Not Required." No further action is required, and the Record Data process will be closed. C. Contractor is to resubmit the Record Data until it is acceptable and marked "Filed as Received." ARTICLE 27—CONSTRUCTION PROGRESS SCHEDULE 27.01 Requirements A. Prepare and submit a Progress Schedule for the Work and update the schedule on a monthly basis for the duration of the Project. B. Provide schedule in adequate detail to allow Owner to monitor progress and to relate document processing to sequential activities of the Work. C. Incorporate and specifically designate the dates of anticipated submission of documents and the dates when documents must be returned to the Contractor into the schedule. D. Assume complete responsibility for maintaining the progress of the Work per the schedule submitted. E. Schedule Work based upon a six day work week. 27.02 Document Submittal A. Submit Progress Schedules in accordance with Article 24. B. Submit a preliminary schedule within 10 days after the Notice of Award. The schedule is to be available at the pre-construction conference. C. Submit a detailed schedule at least 10 days prior to the first payment request. D. Submit Progress Schedule updates monthly with Applications for Payment to indicate the progress made on the Project to that date. Failure to submit the schedule may cause delay in the review and approval of Applications for Payment. 27.03 Schedule Requirements A. Schedule is to be in adequate detail to: 1. Assure adequate planning, scheduling, and reporting during the execution of the Work; 2. Assure the coordination of the Work of the Contractor and the various Subcontractors and Suppliers; 3. Assist in monitoring the progress of the Work; and General Conditions 007200- 121 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 4. Assist in evaluating proposed changes to the Contract Times and Project schedule. B. Provide personnel with 5 years' minimum experience in scheduling construction work comparable to this Project. Prepare the schedule using acceptable scheduling software. C. Provide the schedule in the form of a computer generated critical path schedule which includes Work to be performed on the Project. It is intended that the schedule accomplish the following: 1. Give early warning of delays in time for correction. 2. Provide detailed plans for the execution of the Work in the form of future activities and events in sequential relationships. 3. Establish relationships of significant planned Work activities and provide a logical sequence for planned Work activities. 4. Provide continuous current status information. 5. Allow analysis of the Contractor's program for the completion of the Project. 6. Permit schedules to be revised when the existing schedule is not achievable. 7. Log the progress of the Work as it actually occurs. D. Prepare a time scaled CPM arrow or precedence diagram to indicate each activity and its start and stop dates. 1. Develop Milestone dates and Project completion dates to conform to time constraints, sequencing requirements and Contract completion date. 2. Use calendar day durations while accounting for holidays and weather conditions in the projection of the duration of each activity. 3. Clearly indicate the critical path for Work to complete the Project. E. Provide a time scaled horizontal bar chart which indicates graphically the Work scheduled at any time during the Project. The chart is to indicate: 1. Complete sequence of construction by activity; 2. Identification of the activity by structure, location, and type of Work; 3. Chronological order of the start of each item of Work; 4. The activity start and stop dates; 5. The activity duration; 6. Successor and predecessor relationships for each activity; 7. A clearly indicated single critical path; and 8. Projected percentage of completion, based on dollar value of the Work included in each activity as of the first day of each month. F. Provide a schedule incorporating the Schedule of Documents provided in accordance with Article 24 indicating: 1. Specific date each document is to be delivered to the Designer. 2. Specific date each document must be received in order to meet the proposed schedule. General Conditions 007200- 122 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 3. Allow a reasonable time to review documents, taking into consideration the size and complexity of the document, other documents being processed, and other factors that may affect review time. 4. Allow time for re-submission of each document. Contractor is responsible for delays associated with additional time required to review incomplete or erroneous documents and for time lost when documents are submitted for products that do not meet Specification requirements. 27.04 Schedule Revisions A. Revise the schedule if it appears that the schedule no longer represents the actual progress of the Work. 1. Submit a written report if the schedule indicates that the Project is more than 30 days behind schedule. The report is to include: a. Number of days behind schedule; b. Narrative description of the steps to be taken to bring the Project back on schedule; and c. Anticipated time required to bring the Project back on schedule. 2. Submit a revised schedule indicating the action that the Contractor proposes to take to bring the Project back on schedule. B. Revise the schedule to indicate any adjustments in Contract Times approved by Modification. 1. Include a revised schedule with Change Proposals if a change in Contract Times is requested. 2. OPT will deem any Change Proposal that does not have a revised schedule and request for a change in Contract Times as having no impact on the ability of the Contractor to complete the Project within the Contract Times. C. Updating the Project schedule to reflect actual progress is not considered a revision to the Project schedule. D. Applications for Payment may not be recommended for payment without a revised schedule and if required, the report indicating the Contractor's plan for bringing the Project back on schedule. 27.05 Float Time A. Define float time as the amount of time between the earliest start date and the latest start date of a chain of activities on the construction schedule. B. Float time is not for the exclusive use or benefit of either the Contractor or Owner. C. Where several subsystems each have a critical path, the subsystem with the longest time of completion is the critical path and float time is to be assigned to other subsystems. D. Contract Times cannot be changed by the submission of a schedule. Contract Times can only be modified by a Change Order or Contract Amendment. General Conditions 007200- 123 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 E. Schedule completion date must be the same as the Contract completion date. Time between the end of construction and the Contract completion date is float time. ARTICLE 28—VIDEO AND PHOTOGRAPHIC DOCUMENTATION 28.01 Work Included A. Provide a video recording of the Site prior to the beginning of construction. 1. Record the condition of all existing facilities in or abutting the construction area (right- of-way)including but not limited to streets,curb and gutter, utilities,driveways,fencing, landscaping, etc. 2. Record after construction staking is complete but prior to any clearing. 3. Provide one copy of the recording, dated and labeled to the OAR before the start of construction. Provide additional recording as directed by the OAR if the recording provided is not considered suitable for the purpose of recording pre-existing conditions. B. Furnish an adequate number of photographs of the Site to clearly depict the completed Project. 1. Provide a minimum of ten different views. 2. Photograph a panoramic view of the entire Site. 3. Photograph all significant areas of completed construction. 4. Completion photographs are not to be taken until all construction trailers, excess materials, trash, and debris have been removed. 5. Employ a professional photographer approved by the OAR to photograph the Project. 6. Provide one aerial photograph of the Site from an angle and height to include the entire Site while providing adequate detail. C. All photographs, video recordings, and a digital copy of this media are to become the property of the Owner. Photographs or recordings may not be used for publication,or public or private display without the written consent of the Owner. 28.02 Quality Assurance A. Provide clear photographs and recordings taken with proper exposure. View photographs and recordings in the field and take new photographs or recordings immediately if photos of an adequate print quality cannot be produced or video quality is not adequate. Provide photographs with adequate quality and resolution to permit enlargements. 28.03 Document Submittal A. Submit photographic documentation as Record Data in accordance with Article 24. B. Submit two DVDs of the video recording as Record Data in accordance with Article 24. General Conditions 007200- 124 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 28.04 Photographs A. Provide photographs in digital format with a minimum resolution of 1280 x 960, accomplished without a digital zoom. B. Take photographs at locations acceptable to the OAR. C. Provide two color prints of each photograph and a digital copy on a DVD of each photograph taken. D. Identify each print on back with: 1. Project name. 2. Date,time, location, and orientation of the exposure. 3. Description of the subject of photograph. E. Submit photographs in clear plastic sheets designed for photographs. Place only one photograph in each sheet to allow the description on the back to be read without removing the photograph. F. Final photographs are to include two 8-by-10-inch glossy color prints for each of ten photographs selected by the OAR. These photographs are in addition to normal prints. 28.05 Video Recording A. Provide digital format on DVD that can be played with Windows Media Player in common format in full screen mode. B. Identify Project on video by audio or visual means. C. Video file size should not exceed 400 MB. D. Video resolution shall be 1080p. E. The quality of the video must be sufficient to determine the existing conditions of the construction area. Camera panning must be performed while at rest, do not pan the camera while walking or driving. Camera pans should be performed at intervals sufficient to clearly view the entire construction area. F. DVD shall be labeled with construction stationing and stationing should be called out, voice recorded, in the video. G. The entire construction area recording shall be submitted at once. Sections submitted separately will not be accepted. H. Pipeline projects should be recorded linearly from beginning to end. ARTICLE 29—EXECUTION AND CLOSEOUT 29.01 Substantial Completion A. Notify the OAR that the Work or a designated portion of the Work is substantially complete per the General Conditions. Include a list of the items remaining to be completed or corrected before the Project will be considered to be complete. General Conditions 007200- 125 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 B. OPT will visit the Site to observe the Work within 30 days after notification is received to determine the status of the Project. C. OAR will notify the Contractor, within 120 days after notification, that the Work is either substantially complete or that additional Work must be performed before the Project will be considered substantially complete. 1. OAR will notify the Contractor of items that must be completed before the Project will be considered substantially complete. 2. Correct the noted deficiencies in the Work. 3. Notify the OAR when the items of Work in the OAR's notice have been completed. 4. OPT will revisit the Site and repeat the process. 5. OAR will issue a Certificate of Substantial Completion to the Contractor when the OPT considers the Project to be substantially complete. The Certificate will include a tentative list of items to be corrected before Final Payment will be recommended. 6. Review the list and notify the OAR of any objections to items on the list within 10 days after receiving the Certificate of Substantial Completion. 29.02 Final Inspections A. Notify the OAR when: 1. Work has been completed in compliance with the Contract Documents; 2. Equipment and systems have been tested per Contract Documents and are fully operational; 3. Final Operations and Maintenance Manuals have been provided to the Owner and all operator training has been completed; 4. Specified spare parts and special tools have been provided; and 5. Work is complete and ready for final inspection. B. OPT will visit the Site to determine if the Project is complete and ready for Final Payment within 30 days after the notice is received. C. Designer will notify the Contractor that the Project is complete or will notify the Contractor that Work is Defective. D. Take immediate steps to correct Defective Work. Notify the Designer when Defective Work has been corrected. OPT will visit the Site to determine if the Project is complete and the Work is acceptable. OAR will notify the Contractor that the Project is complete or will notify the Contractor that Work is Defective. E. Submit the Request for Final Payment with the closeout documents described in Paragraph 29.04 if notified that the Project is complete, and the Work is acceptable. 29.03 Reinspection Fees A. Owner may impose a Set-off against the Application for Payment in accordance with the General Conditions to compensate the OPT for additional visits to the Project if additional Work is required. General Conditions 007200- 126 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 29.04 Closeout Documents Submittal A. Record Documents per Article 20. B. Warranties and bonds. C. Equipment installation reports on equipment. D. Shop Drawings, Record Data, and other documents as required by the Contract Documents. E. Evidence of continuing insurance and bond coverage as required by the Contract Documents. F. Final Photographs per Article 28. 29.05 Transfer of Utilities A. If applicable to the Project,transfer utilities to the Owner when the Certificate of Substantial Completion has been issued and the Work has been occupied by the Owner. B. Submit final meter readings for utilities and similar data as of the date the Owner occupied the Work. 29.06 Warranties, Bonds and Service Agreements A. Provide warranties, bonds, and service agreements required by the Contract Documents. B. The date for the start of warranties, bonds, and service agreements is established per the Contract Documents. C. Compile warranties, bonds, and service agreements and review these documents for compliance with the Contract Documents. 1. Provide a log of all equipment covered under the 1-year correction period specified in the Contract Documents and all products for which special or extended warranties or guarantees are provided. Index the log by Specification Section number on forms provided. Include items 2.e through 2.g below in the tabulation. 2. Provide a copy of specific warranties or guarantees under a tab indexed to the log. Each document is to include: a. A description of the product or Work item; b. The firm name with the name of the principal, address, and telephone number; c. Signature of the respective Supplier or Subcontractor to acknowledge existence of the warranty obligation for extended warranties and service agreements; d. Scope of warranty, bond, or service agreement; e. Indicate the start date for the correction period specified in the Contract Documents for each product and the date on which the specified correction period expires. f. Indicate the start date for extended warranties for each product and the date on which the specified extended warranties period expires. g. Start date, warranty or guarantee period, and expiration date for each warranty, bond, and service agreement; General Conditions 007200- 127 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 h. Procedures to be followed in the event of a failure; and i. Specific instances that might invalidate the warranty or bond. D. Submit digital copies of the documents to the Designer for review. E. Submit warranties, bonds, and service agreements within 10 days after equipment or components are placed in service. ARTICLE 30—MISCELLANEOUS 30.01 Computation of Times A. Exclude the first day and include the last day when determining dates for a period of time referred to in the Contract Documents by days. The last day of this period is to be omitted from the determination if it falls on a Sunday or a legal holiday. B. All references and conditions for a Calendar Day Contract in the Contract Documents apply for a Fixed Date Contract. A Fixed Date Contract is one in which the calendar dates for reaching Substantial Completion and/or final completion are specified in lieu of identifying the number of days involved. 30.02 Owner's Right to Audit Contractor's Records A. By execution of the Contract, Contractor grants Owner the right to audit, examine, inspect and/or copy, at Owner's election at all reasonable times during the term of this Contract and for a period of four (4) years following the completion or termination of the Work, all of Contractor's written and electronically stored records and billings relating to the performance of the Work under the Contract Documents. The audit, examination or inspection may be performed by an Owner designee,which may include its internal auditors or an outside representative engaged by Owner. Contractor agrees to retain its records for a minimum of four(4)years following termination of the Contract, unless there is an ongoing dispute under the Contract,then, such retention period must extend until final resolution of the dispute. As used in these General Conditions, "Contractor written and electronically stored records" include any and all information, materials and data of every kind and character generated as a result of the work under this Contract. Examples of Contractor written and electronically stored records include, but are not limited to:accounting data and reports, billings, books, general ledgers, cost ledgers, invoices, production sheets, documents, correspondence, meeting notes, subscriptions, agreements, purchase orders, leases, contracts, commitments, arrangements, notes, daily diaries, reports, drawings, receipts, vouchers, memoranda, time sheets, payroll records, policies, procedures, Subcontractor agreements, Supplier agreements, rental equipment proposals, federal and state tax filings for any issue in question, along with any and all other agreements, sources of information and matters that may, in Owner's sole judgment, have any bearing on or pertain to any matters, rights, duties or obligations under or covered by any Contract Documents. B. Owner agrees to exercise the right to audit, examine or inspect Contractor's records only during regular business hours. Contractor agrees to allow Owner and/or Owner's designee access to all of the Contractor's Records, Contractor's facilities, and current or former employees of Contractor, deemed necessary by Owner or its designee(s), to perform such audit, inspection or examination. Contractor also agrees to provide adequate and General Conditions 007200- 128 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 appropriate work space necessary for Owner or its designees to conduct such audits, inspections or examinations. C. Contractor must include this Paragraph 30.02 in any Subcontractor, supplier or vendor contract. 30.03 Independent Contractor A. Contractor is to perform its duties under this Contract as an independent contractor. The Contractor's Team and their personnel are not considered to be employees or agents of the Owner. Nothing in this Contract is to be interpreted as granting Contractor's Team the right or authority to make commitments for the Owner. This Contract does not constitute or create a joint venture, partnership or formal business organization of any kind. 30.04 Cumulative Remedies A. The duties and obligations imposed by these General Conditions and the rights and remedies available to the Owner or Contractor by these General Conditions are in addition to, and are not a limitation of,the rights and remedies which are otherwise imposed or available by: 1. Laws or Regulations; 2. Special warranties or guarantees; or 3. Other provisions of the Contract Documents. B. The provisions of this Paragraph 30.04 are as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right and remedy to which they apply. 30.05 Limitation of Damages A. Owner is not liable to Contractor for claims, costs, losses or damages sustained by Contractor's Team associated with other projects or anticipated projects. 30.06 No Waiver A. The failure of Owner or Contractor to enforce any provision of this Contract does not constitute a waiver of that provision or affect the enforceability of that provision or the remainder of this Contract. 30.07 Severability A. If a court of competent jurisdiction renders a part of this Contract invalid or unenforceable, that part is to be severed and the remainder of this Contract continues in full force. 30.08 Survival of Obligations A. Representations, indemnifications, warranties, guarantees and continuing obligations required by the Contract Documents survive completion and acceptance of the Work or termination of the Contract. General Conditions 007200- 129 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 30.09 No Third Party Beneficiaries A. Nothing in this Contract can be construed to create rights in any entity other than the Owner and Contractor. Neither the Owner nor Contractor intends to create third party beneficiaries by entering into this Contract. 30.10 Assignment of Contract A. This Contract may not be assigned in whole or in part by the Contractor without the prior written consent of the Owner. 30.11 No Waiver of Sovereign Immunity A. The Owner has not waived its sovereign immunity by entering into and performing its obligations under this Contract. B. This Contract is to perform a governmental function solely for the public benefit. 30.12 Controlling Law A. This Contract is governed by the laws of the State of Texas without regard to its conflicts of laws. Venue for legal proceedings lies exclusively in Nueces County, Texas. Cases must be filed and tried in Nueces County and cannot be removed from Nueces County,Texas. 30.13 Conditions Precedent to Right to Sue A. Notwithstanding anything herein to the contrary,Contractor will have at least 90 days to give notice of a claim for damages as a condition precedent to the right to sue on the Contract, subject to the contractual Claims and Alternative Dispute Resolution processes set forth herein. 30.14 Waiver of Trial by Jury A. Owner and Contractor agree that they have knowingly waived and do hereby waive the right to trial by jury and have instead agreed, in the event of any litigation arising out of or connected to this Contract, to proceed with a trial before the court, unless both parties subsequently agree otherwise in writing. 30.15 Attorney Fees A. The Parties expressly agree that, in the event of litigation, all parties waive rights to payment of attorneys' fees that otherwise might be recoverable, pursuant to the Texas Civil Practice and Remedies Code Chapter 38, Texas Local Government Code §271.153, the Prompt Payment Act, common law or any other provision for payment of attorney's fees. 30.16 Compliance with Laws A. Comply with the Americans with Disabilities Act of 1990 as amended (ADA) and Texas Architectural Barriers Act and all regulations relating to either statute. B. No qualified person shall on the basis of race, color, religion, national origin, gender, age or disability be excluded from participation in, be denied the benefits of, or be subjected to General Conditions 007200- 130 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 discrimination under any program or activity which receives or benefits from federal financial assistance. C. Comply with all applicable federal, state and city laws, rules and regulations. D. Each applicable provision and clause required by law to be inserted into the Contract shall be deemed to be enacted herein,and the Contract shall be read and enforced as though each were physically included herein. 30.17 Enforcement A. The City Manager or designee and the City Attorney or designee are fully authorized and will have the right to enforce all legal rights and obligations under the Contract without further authorization from City Council. 30.18 Subject to Appropriation A. Funds are appropriated by the Owner on a yearly basis. If for any reason, funds are not appropriated in any given year, the Owner may direct immediate suspension or termination of the Contract with no additional liability to the Owner. If the Contractor is terminated or suspended and the Owner requests remobilization at a later date, the Contractor may request payment for reasonable demo bilization/remobiIization costs. Such costs shall be addressed through a Change Order to the Contract. Under no circumstances may a provision or obligation under this Contract be interpreted as contrary to this paragraph. 30.19 Contract Sum A. The Contract Sum is stated in the Contract and, including authorized adjustments, is the total maximum not-to-exceed amount payable by Owner to Contractor for performance of the Work under the Contract Documents. Contractor accepts and agrees that all payments pursuant to this Contract are subject to the availability and appropriation of funds by the Corpus Christi City Council. If funds are not available and/or appropriated,this Contract shall immediately be terminated with no liability to any party to this Contract. 30.20 Contractor's Guarantee as Additional Remedy A. The Contractor's guarantee is a separate and additional remedy available to benefit the Owner. Neither the guarantee nor the expiration of the guarantee period will operate to reduce, release or relinquish any rights or remedies available to the Owner for any claims or causes of action against the Contractor or any other individual or entity. 30.21 Notices. A. Any notice required to be given to Owner under any provision in this Contract must include a copy to OAR by mail or e-mail. END OF SECTION General Conditions 007200- 131 Corpus Christi Standards Rev 12/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 00 73 00 SUPPLEMENTARY CONDITIONS These Supplementary Conditions amend or supplement SECTION 00 72 00 GENERAL CONDITIONS and other provisions of the Contract Documents. All provisions not amended or supplemented in these Supplementary Conditions remain in effect. The terms used in these Supplementary Conditions have the meanings stated in the General Conditions. Additional terms used in these Supplementary Conditions have the meanings stated below. ARTICLE 1—DEFINITIONS AND TERMINOLOGY SC-1.01 DEFINED TERMS A. The members of the OPT as defined in Paragraph 1.01.A.41 consists of the following organizations: City of Corpus Christi, Texas Munoz Engineering, LLC ARTICLE 4—COMMENCEMENT AND PROGRESS OF THE WORK SC-4.04 DELAYS IN CONTRACTOR'S PROGRESS A. The allocation for delays in the Contractor's progress for rain days as set forth in General Conditions Paragraph 4.04.D are to be determined as follows: 1. Include rain days in developing the schedule for construction. Schedule construction so that the Work will be completed within the Contract Times assuming that these rain days will occur. Incorporate residual impacts following rain days such as limited access to and within the Site, inability to work due to wet or muddy Site conditions, delays in delivery of equipment and materials, and other impacts related to rain days when developing the schedule for construction. Include all costs associated with these rain days and residual impacts in the Contract Price. 2. A rain day is defined as any day in which the amount of rain measured by the National Weather Services at the Power Street Stormwater Pump Station is 0.50 inch or greater. Records indicate the following average number of rain days for each month: Month Day Month Days January 3 July 3 February 3 August 4 March 2 September 7 April 3 October 4 May 4 November 3 June 4 December 3 3. A total of 15 rain days have been set for this Project. An extension of time due to rain days will be considered only after 10 rain days have been exceeded and the OAR has determined that a detrimental impact to the construction schedule resulted from the Supplementary Conditions 007300- 1 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 excessive rainfall. Rain days are to be incorporated into the schedule and unused rain days will be considered float time which may be consumed by the Owner or Contractor in delay claims. ARTICLE 5 — AVAILABILITY OF LANDS; SUBSURFACE CONDITIONS AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS SC-5.03 SUBSURFACE AND PHYSICAL CONDITIONS A. This Supplementary Condition identifies documents referenced in General Conditions Paragraph 5.03.A which describe subsurface and physical conditions. 1. Geotechnical Reports include the following: Geotechnical Report— 18010A Callicoatte Road—IH 37 to Up River Road, Corpus Christi, Texas—Tolunay-Wong Engineers, Inc., August 29, 2019 Project No. 19.53.041/Report No. 23371 SC-5.06 HAZARDOUS ENVIRONMENTAL CONDITIONS AT SITE A. This Supplementary Condition identifies documents referenced in General Conditions Paragraph 5.06 which describe Hazardous Environmental Conditions that have been identified at or adjacent to the Site. 1. Environmental Reports include the following: None 2. Drawings of physical conditions relating to known Hazardous Environmental Conditions at the Site include the following: None B. This Supplementary Condition identifies documents referenced in General Conditions Paragraph 5.06 which describe Hazardous Environmental Conditions that have been identified at or adjacent to the Site. No reports of explorations or tests for Hazardous Environmental Conditions at or contiguous to the Site are known to Owner. ARTICLE 6—BONDS AND INSURANCE SC-6.03 REQUIRED MINIMUM INSURANCE COVERAGE INSURANCE REQUIREMENTS CONTRACTOR'S INSURANCE AMOUNTS Provide the insurance coverage for at least the following amounts unless greater amounts are required by Laws and Regulations: Type of Insurance Minimum Insurance Coverage Commercial General Liability including 1. Commercial Form 2. Premises—Completed Operations 3. Explosions and Collapse Hazard 4. Underground Hazard $1,000,000 Per Occurrence 5. Products/Completed Operations Hazard $2,000,000 Aggregate 6. Contractual Liability 7. Broad Form Property Damage 8. Independent Contractors Supplementary Conditions 007300- 2 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 9. Personal &Advertising Injury Business Automobile Liability-Owned, Non- $1,000,000 Combined Single Limit Owned, Rented and Leased Workers' Compensation Statutory Employer's Liability $500,000/500,000/500,000 Excess Liability/Umbrella Liability $1,000,000 Per Occurrence Required if Contract Price>$5,000,000 Contractor's Pollution Liability / $1,000,000 Per Claim Environmental Impairment Coverage Not limited to sudden and accidental ® Required ❑ Not Required discharge. To include long-term environmental impact for the disposal of pollutants/contaminants. Required if excavation>3 ft Builder's Risk(All Perils including Collapse) Equal to Full Replacement Cost of Structure and Contents Required for vertical structures and bridges ❑ Required ® Not Required Installation Floater Equal to Contract Price Required if installing city-owned equipment ❑ Required ® Not Required ARTICLE 7—CONTRACTOR'S RESPONSIBILITIES SC-7.02 LABOR; WORKING HOURS B. Perform Work at the Site during regular working hours except as otherwise required for the safety or protection of person or the Work or property at the Site or adjacent to the Site and except as otherwise stated in the Contract Documents. Regular working hours are between 7:00 a.m.and 7:00 p.m. Monday through Friday unless other times are specifically authorized in writing by OAR. SC-7.04 CONCERNING SUBCONTRACTORS, SUPPLIERS,AND OTHERS A. Add the following sentence to the end of Paragraph 7.04.A: "The Contractor must perform at least 50 percent of the Work, measured as a percentage of the Contract Price, using its own employees." Supplementary Conditions 007300-3 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 ARTICLE 14—PREVAILING WAGE RATE REQUIREMENTS SC-14.04 PREVAILING WAGE RATES A. The minimum rates for various labor classifications as established by the Owner are shown below: Wage Determination Construction Type Project Type (WD) No TX21 Heavy Heavy Construction Projects (including Sewer and Water Line Construction and Drainage Projects) TX29 Highway Highway Construction Projects (excluding tunnels, building structures in rest area projects & railroad construction; bascule, suspension & spandrel arch bridges designed for commercial navigation, bridges involving marine construction; and other major bridges). Supplementary Conditions 007300-4 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 "GENERAL DECISION NUMBER:TX20210021 01/01/2021 SUPERSEDED GENERAL DECISION NUMBER:TX20200021 STATE:TEXAS CONSTRUCTION TYPE: HEAVY COUNTIES: NUECES AND SAN PATRICIO COUNTIES IN TEXAS. HEAVY CONSTRUCTION PROJECTS (INCLUDING SEWER AND WATER LINE CONSTRUCTION AND DRAINAGE PROJECTS) NOTE: UNDER EXECUTIVE ORDER(EO) 13658,AN HOURLY MINIMUM WAGE OF$10.95 FOR CALENDAR YEAR 2021 APPLIES TO ALL CONTRACTS SUBJECT TO THE DAVIS-BACON ACT FOR WHICH THE CONTRACT IS AWARDED (AND ANY SOLICITATION WAS ISSUED) ON OR AFTER JANUARY 1,2015. IF THIS CONTRACT IS COVERED BY THE EO,THE CONTRACTOR MUST PAY ALL WORKERS IN ANY CLASSIFICATION LISTED ON THIS WAGE DETERMINATION AT LEAST$10.95 PER HOUR (OR THE APPLICABLE WAGE RATE LISTED ON THIS WAGE DETERMINATION, IF IT IS HIGHER) FOR ALL HOURS SPENT PERFORMING ON THE CONTRACT IN CALENDAR Supplementary Conditions 007300-5 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 YEAR 2021. IF THIS CONTRACT IS COVERED BY THE EO AND A CLASSIFICATION CONSIDERED NECESSARY FOR PERFORMANCE OF WORK ON THE CONTRACT DOES NOT APPEAR ON THIS WAGE DETERMINATION,THE CONTRACTOR MUST PAY WORKERS IN THAT CLASSIFICATION AT LEAST THE WAGE RATE DETERMINED THROUGH THE CONFORMANCE PROCESS SET FORTH IN 29 CFR 5.5(A)(1)(II) (OR THE EO MINIMUM WAGE RATE, IF IT IS HIGHER THAN THE CONFORMED WAGE RATE). THE EO MINIMUM WAGE RATE WILL BE ADJUSTED ANNUALLY. PLEASE NOTE THAT THIS EO APPLIES TO THE ABOVE-MENTIONED TYPES OF CONTRACTS ENTERED INTO BY THE FEDERAL GOVERNMENT THAT ARE SUBJECT TO THE DAVIS-BACON ACT ITSELF, BUT IT DOES NOT APPLY TO CONTRACTS SUBJECT ONLY TO THE DAVIS-BACON RELATED ACTS, INCLUDING THOSE SET FORTH AT 29 CFR 5.1(A)(2)-(60). ADDITIONAL INFORMATION ON CONTRACTOR REQUIREMENTS AND WORKER PROTECTIONS UNDER THE EO IS AVAILABLE AT WWW.DOL.GOV/WHD/GOVCONTRACTS. MODIFICATION NUMBER PUBLICATION DATE 0 01/01/2021 * SUTX1987-001 12/01/1987 Supplementary Conditions 007300- 6 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 RATES FRINGES CARPENTER (EXCLUDING FORM SETTING).........................$ 9.05 CONCRETE FINISHER................$ 7.56 ELECTRICIAN......................$ 13.37 2.58 LABORERS: COMMON......................$ 7.25 UTILITY.....................$ 7.68 POWER EQUIPMENT OPERATORS: BACKHOE.....................$ 9.21 MOTOR GRADER................$ 8.72 ---------------------------------------------------------------- WELDERS - RECEIVE RATE PRESCRIBED FOR CRAFT PERFORMING OPERATION TO WHICH WELDING IS INCIDENTAL. ---------------------------------------------------------------- ---------------------------------------------------------------- NOTE: EXECUTIVE ORDER (EO) 13706, ESTABLISHING PAID SICK LEAVE Supplementary Conditions 007300-7 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 FOR FEDERAL CONTRACTORS APPLIES TO ALL CONTRACTS SUBJECT TO THE DAVIS-BACON ACT FOR WHICH THE CONTRACT IS AWARDED (AND ANY SOLICITATION WAS ISSUED) ON OR AFTER JANUARY 1, 2017. IF THIS CONTRACT IS COVERED BY THE EO,THE CONTRACTOR MUST PROVIDE EMPLOYEES WITH 1 HOUR OF PAID SICK LEAVE FOR EVERY 30 HOURS THEY WORK, UP TO 56 HOURS OF PAID SICK LEAVE EACH YEAR. EMPLOYEES MUST BE PERMITTED TO USE PAID SICK LEAVE FOR THEIR OWN ILLNESS, INJURY OR OTHER HEALTH-RELATED NEEDS, INCLUDING PREVENTIVE CARE;TO ASSIST A FAMILY MEMBER (OR PERSON WHO IS LIKE FAMILY TO THE EMPLOYEE)WHO IS ILL, INJURED, OR HAS OTHER HEALTH-RELATED NEEDS, INCLUDING PREVENTIVE CARE; OR FOR REASONS RESULTING FROM, OR TO ASSIST A FAMILY MEMBER (OR PERSON WHO IS LIKE FAMILY TO THE EMPLOYEE)WHO IS A VICTIM OF, DOMESTIC VIOLENCE, SEXUAL ASSAULT, OR STALKING. ADDITIONAL INFORMATION ON CONTRACTOR REQUIREMENTS AND WORKER PROTECTIONS UNDER THE EO IS AVAILABLE AT WWW.DOL.GOV/WHD/GOVCONTRACTS. UNLISTED CLASSIFICATIONS NEEDED FOR WORK NOT INCLUDED WITHIN THE SCOPE OF THE CLASSIFICATIONS LISTED MAY BE ADDED AFTER AWARD ONLY AS PROVIDED IN THE LABOR STANDARDS CONTRACT CLAUSES (29CFR 5.5 (A) (1) (II)). ---------------------------------------------------------------- Supplementary Conditions 007300-8 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 THE BODY OF EACH WAGE DETERMINATION LISTS THE CLASSIFICATION AND WAGE RATES THAT HAVE BEEN FOUND TO BE PREVAILING FOR THE CITED TYPE(S) OF CONSTRUCTION IN THE AREA COVERED BY THE WAGE DETERMINATION. THE CLASSIFICATIONS ARE LISTED IN ALPHABETICAL ORDER OF ""IDENTIFIERS"" THAT INDICATE WHETHER THE PARTICULAR RATE IS A UNION RATE (CURRENT UNION NEGOTIATED RATE FOR LOCAL), A SURVEY RATE (WEIGHTED AVERAGE RATE) OR A UNION AVERAGE RATE (WEIGHTED UNION AVERAGE RATE). UNION RATE IDENTIFIERS A FOUR LETTER CLASSIFICATION ABBREVIATION IDENTIFIER ENCLOSED IN DOTTED LINES BEGINNING WITH CHARACTERS OTHER THAN ""SU"" OR ""UAVG"" DENOTES THAT THE UNION CLASSIFICATION AND RATE WERE PREVAILING FOR THAT CLASSIFICATION IN THE SURVEY. EXAMPLE: PLUM0198-005 07/01/2014. PLUM IS AN ABBREVIATION IDENTIFIER OF THE UNION WHICH PREVAILED IN THE SURVEY FOR THIS CLASSIFICATION, WHICH IN THIS EXAMPLE WOULD BE PLUMBERS. 0198 INDICATES THE LOCAL UNION NUMBER OR DISTRICT COUNCIL NUMBER WHERE APPLICABLE, I.E., PLUMBERS LOCAL 0198. THE NEXT NUMBER, 005 IN THE EXAMPLE, IS AN INTERNAL NUMBER USED IN PROCESSING THE WAGE DETERMINATION. 07/01/2014 IS THE EFFECTIVE DATE OF THE MOST CURRENT NEGOTIATED RATE,WHICH IN THIS EXAMPLE IS JULY 1, 2014. Supplementary Conditions 007300-9 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 UNION PREVAILING WAGE RATES ARE UPDATED TO REFLECT ALL RATE CHANGES IN THE COLLECTIVE BARGAINING AGREEMENT(CBA)GOVERNING THIS CLASSIFICATION AND RATE. SURVEY RATE IDENTIFIERS CLASSIFICATIONS LISTED UNDER THE ""SU"" IDENTIFIER INDICATE THAT NO ONE RATE PREVAILED FOR THIS CLASSIFICATION IN THE SURVEY AND THE PUBLISHED RATE IS DERIVED BY COMPUTING A WEIGHTED AVERAGE RATE BASED ON ALL THE RATES REPORTED IN THE SURVEY FOR THAT CLASSIFICATION. AS THIS WEIGHTED AVERAGE RATE INCLUDES ALL RATES REPORTED IN THE SURVEY, IT MAY INCLUDE BOTH UNION AND NON-UNION RATES. EXAMPLE: SULA2012-007 5/13/2014. SU INDICATES THE RATES ARE SURVEY RATES BASED ON A WEIGHTED AVERAGE CALCULATION OF RATES AND ARE NOT MAJORITY RATES. LA INDICATES THE STATE OF LOUISIANA. 2012 IS THE YEAR OF SURVEY ON WHICH THESE CLASSIFICATIONS AND RATES ARE BASED.THE NEXT NUMBER, 007 IN THE EXAMPLE, IS AN INTERNAL NUMBER USED IN PRODUCING THE WAGE DETERMINATION. 5/13/2014 INDICATES THE SURVEY COMPLETION DATE FOR THE CLASSIFICATIONS AND RATES UNDER THAT IDENTIFIER. SURVEY WAGE RATES ARE NOT UPDATED AND REMAIN IN EFFECT UNTIL A NEW SURVEY IS CONDUCTED. Supplementary Conditions 007300- 10 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 UNION AVERAGE RATE IDENTIFIERS CLASSIFICATION(S) LISTED UNDER THE UAVG IDENTIFIER INDICATE THAT NO SINGLE MAJORITY RATE PREVAILED FOR THOSE CLASSIFICATIONS; HOWEVER, 100%OF THE DATA REPORTED FOR THE CLASSIFICATIONS WAS UNION DATA. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG INDICATES THAT THE RATE IS A WEIGHTED UNION AVERAGE RATE. OH INDICATES THE STATE.THE NEXT NUMBER, 0010 IN THE EXAMPLE, IS AN INTERNAL NUMBER USED IN PRODUCING THE WAGE DETERMINATION. 08/29/2014 INDICATES THE SURVEY COMPLETION DATE FOR THE CLASSIFICATIONS AND RATES UNDER THAT IDENTIFIER. A UAVG RATE WILL BE UPDATED ONCE A YEAR, USUALLY IN JANUARY OF EACH YEAR, TO REFLECT A WEIGHTED AVERAGE OF THE CURRENT NEGOTIATED/CBA RATE OF THE UNION LOCALS FROM WHICH THE RATE IS BASED. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) HAS THERE BEEN AN INITIAL DECISION IN THE MATTER?THIS CAN BE: Supplementary Conditions 007300- 11 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 * AN EXISTING PUBLISHED WAGE DETERMINATION * A SURVEY UNDERLYING A WAGE DETERMINATION * A WAGE AND HOUR DIVISION LETTER SETTING FORTH A POSITION ON A WAGE DETERMINATION MATTER * A CONFORMANCE (ADDITIONAL CLASSIFICATION AND RATE) RULING ON SURVEY RELATED MATTERS, INITIAL CONTACT, INCLUDING REQUESTS FOR SUMMARIES OF SURVEYS, SHOULD BE WITH THE WAGE AND HOUR REGIONAL OFFICE FOR THE AREA IN WHICH THE SURVEY WAS CONDUCTED BECAUSE THOSE REGIONAL OFFICES HAVE RESPONSIBILITY FOR THE DAVIS-BACON SURVEY PROGRAM. IF THE RESPONSE FROM THIS INITIAL CONTACT IS NOT SATISFACTORY,THEN THE PROCESS DESCRIBED IN 2.) AND 3.)SHOULD BE FOLLOWED. WITH REGARD TO ANY OTHER MATTER NOT YET RIPE FOR THE FORMAL PROCESS DESCRIBED HERE, INITIAL CONTACT SHOULD BE WITH THE BRANCH OF CONSTRUCTION WAGE DETERMINATIONS. WRITE TO: BRANCH OF CONSTRUCTION WAGE DETERMINATIONS WAGE AND HOUR DIVISION U.S. DEPARTMENT OF LABOR 200 CONSTITUTION AVENUE, N.W. WASHINGTON, DC 20210 Supplementary Conditions 007300- 12 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 2.) IF THE ANSWER TO THE QUESTION IN 1.) IS YES,THEN AN INTERESTED PARTY(THOSE AFFECTED BY THE ACTION) CAN REQUEST REVIEW AND RECONSIDERATION FROM THE WAGE AND HOUR ADMINISTRATOR (SEE 29 CFR PART 1.8 AND 29 CFR PART 7).WRITE TO: WAGE AND HOUR ADMINISTRATOR U.S. DEPARTMENT OF LABOR 200 CONSTITUTION AVENUE, N.W. WASHINGTON, DC 20210 THE REQUEST SHOULD BE ACCOMPANIED BY A FULL STATEMENT OF THE INTERESTED PARTY'S POSITION AND BY ANY INFORMATION (WAGE PAYMENT DATA, PROJECT DESCRIPTION,AREA PRACTICE MATERIAL, ETC.)THAT THE REQUESTOR CONSIDERS RELEVANT TO THE ISSUE. 3.) IF THE DECISION OF THE ADMINISTRATOR IS NOT FAVORABLE, AN INTERESTED PARTY MAY APPEAL DIRECTLY TO THE ADMINISTRATIVE REVIEW BOARD (FORMERLY THE WAGE APPEALS BOARD). WRITE TO: ADMINISTRATIVE REVIEW BOARD U.S. DEPARTMENT OF LABOR 200 CONSTITUTION AVENUE, N.W. WASHINGTON, DC 20210 4.)ALL DECISIONS BY THE ADMINISTRATIVE REVIEW BOARD ARE FINAL. Supplementary Conditions 007300- 13 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 ---------------------------------------------------------------- ---------------------------------------------------------------- END OF GENERAL DECISION "GENERAL DECISION NUMBER:TX20210029 01/01/2021 SUPERSEDED GENERAL DECISION NUMBER:TX20200029 STATE:TEXAS CONSTRUCTION TYPE: HIGHWAY COUNTIES:ARANSAS, CALHOUN, GOLIAD, NUECES AND SAN PATRICIO COUNTIES IN TEXAS. HIGHWAY CONSTRUCTION PROJECTS (EXCLUDING TUNNELS, BUILDING STRUCTURES IN REST AREA PROJECTS& RAILROAD CONSTRUCTION; BASCULE, SUSPENSION &SPANDREL ARCH BRIDGES DESIGNED FOR COMMERCIAL NAVIGATION, BRIDGES INVOLVING MARINE CONSTRUCTION; AND OTHER MAJOR BRIDGES). Supplementary Conditions 007300- 14 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 NOTE: UNDER EXECUTIVE ORDER(EO) 13658,AN HOURLY MINIMUM WAGE OF$10.95 FOR CALENDAR YEAR 2021 APPLIES TO ALL CONTRACTS SUBJECT TO THE DAVIS-BACON ACT FOR WHICH THE CONTRACT IS AWARDED (AND ANY SOLICITATION WAS ISSUED) ON OR AFTER JANUARY 1, 2015. IF THIS CONTRACT IS COVERED BY THE EO,THE CONTRACTOR MUST PAY ALL WORKERS IN ANY CLASSIFICATION LISTED ON THIS WAGE DETERMINATION AT LEAST$10.95 PER HOUR (OR THE APPLICABLE WAGE RATE LISTED ON THIS WAGE DETERMINATION, IF IT IS HIGHER) FOR ALL HOURS SPENT PERFORMING ON THE CONTRACT IN CALENDAR YEAR 2021. IF THIS CONTRACT IS COVERED BY THE EO AND A CLASSIFICATION CONSIDERED NECESSARY FOR PERFORMANCE OF WORK ON THE CONTRACT DOES NOT APPEAR ON THIS WAGE DETERMINATION,THE CONTRACTOR MUST PAY WORKERS IN THAT CLASSIFICATION AT LEAST THE WAGE RATE DETERMINED THROUGH THE CONFORMANCE PROCESS SET FORTH IN 29 CFR 5.5(A)(1)(II) (OR THE EO MINIMUM WAGE RATE, IF IT IS HIGHER THAN THE CONFORMED WAGE RATE). THE EO MINIMUM WAGE RATE WILL BE ADJUSTED ANNUALLY. PLEASE NOTE THAT THIS EO APPLIES TO THE ABOVE-MENTIONED TYPES OF CONTRACTS ENTERED INTO BY THE FEDERAL GOVERNMENT THAT ARE SUBJECT TO THE DAVIS-BACON ACT ITSELF, BUT IT DOES NOT APPLY TO CONTRACTS SUBJECT ONLY TO THE DAVIS-BACON RELATED ACTS, INCLUDING THOSE SET FORTH AT 29 CFR 5.1(A)(2)-(60). ADDITIONAL INFORMATION ON CONTRACTOR REQUIREMENTS AND WORKER PROTECTIONS UNDER THE EO IS AVAILABLE AT WWW.DOL.GOV/WHD/GOVCONTRACTS. Supplementary Conditions 007300- 15 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 MODIFICATION NUMBER PUBLICATION DATE 0 01/01/2021 * SUTX2011-010 08/08/2011 RATES FRINGES CEMENT MASON/CONCRETE FINISHER (PAVING &STRUCTURES)...$ 12.64 FORM BUILDER/FORM SETTER PAVING &CURB...............$ 10.69 STRUCTURES..................$ 13.61 LABORER ASPHALT RAKER...............$ 11.67 FLAGGER.....................$ 8.81 LABORER, COMMON.............$ 10.25 LABORER, UTILITY............$ 11.23 PIPELAYER...................$ 11.17 Supplementary Conditions 007300- 16 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 WORK ZONE BARRICADE SERVICER....................$ 11.51 PAINTER (STRUCTURES).............$21.29 POWER EQUIPMENT OPERATOR: ASPHALT DISTRIBUTOR.........$ 14.25 ASPHALT PAVING MACHINE......$ 13.44 MECHANIC....................$ 17.00 MOTOR GRADER, FINE GRADE....$ 17.74 MOTOR GRADER, ROUGH.........$ 16.85 TRUCK DRIVER LOWBOY-FLOAT................$ 16.62 SINGLE AXLE.................$ 11.61 ---------------------------------------------------------------- WELDERS - RECEIVE RATE PRESCRIBED FOR CRAFT PERFORMING OPERATION TO WHICH WELDING IS INCIDENTAL. ---------------------------------------------------------------- ---------------------------------------------------------------- NOTE: EXECUTIVE ORDER (EO) 13706, ESTABLISHING PAID SICK LEAVE FOR FEDERAL CONTRACTORS APPLIES TO ALL CONTRACTS SUBJECT TO THE DAVIS-BACON ACT FOR WHICH THE CONTRACT IS AWARDED (AND ANY Supplementary Conditions 007300- 17 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SOLICITATION WAS ISSUED) ON OR AFTER JANUARY 1, 2017. IF THIS CONTRACT IS COVERED BY THE EO,THE CONTRACTOR MUST PROVIDE EMPLOYEES WITH 1 HOUR OF PAID SICK LEAVE FOR EVERY 30 HOURS THEY WORK, UP TO 56 HOURS OF PAID SICK LEAVE EACH YEAR. EMPLOYEES MUST BE PERMITTED TO USE PAID SICK LEAVE FOR THEIR OWN ILLNESS, INJURY OR OTHER HEALTH-RELATED NEEDS, INCLUDING PREVENTIVE CARE;TO ASSIST A FAMILY MEMBER (OR PERSON WHO IS LIKE FAMILY TO THE EMPLOYEE)WHO IS ILL, INJURED, OR HAS OTHER HEALTH-RELATED NEEDS, INCLUDING PREVENTIVE CARE; OR FOR REASONS RESULTING FROM, OR TO ASSIST A FAMILY MEMBER (OR PERSON WHO IS LIKE FAMILY TO THE EMPLOYEE)WHO IS A VICTIM OF, DOMESTIC VIOLENCE, SEXUAL ASSAULT, OR STALKING. ADDITIONAL INFORMATION ON CONTRACTOR REQUIREMENTS AND WORKER PROTECTIONS UNDER THE EO IS AVAILABLE AT WWW.DOL.GOV/WHD/GOVCONTRACTS. UNLISTED CLASSIFICATIONS NEEDED FOR WORK NOT INCLUDED WITHIN THE SCOPE OF THE CLASSIFICATIONS LISTED MAY BE ADDED AFTER AWARD ONLY AS PROVIDED IN THE LABOR STANDARDS CONTRACT CLAUSES (29CFR 5.5 (A) (1) (II)). ---------------------------------------------------------------- THE BODY OF EACH WAGE DETERMINATION LISTS THE CLASSIFICATION Supplementary Conditions 007300- 18 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 AND WAGE RATES THAT HAVE BEEN FOUND TO BE PREVAILING FOR THE CITED TYPE(S) OF CONSTRUCTION IN THE AREA COVERED BY THE WAGE DETERMINATION. THE CLASSIFICATIONS ARE LISTED IN ALPHABETICAL ORDER OF ""IDENTIFIERS"" THAT INDICATE WHETHER THE PARTICULAR RATE IS A UNION RATE (CURRENT UNION NEGOTIATED RATE FOR LOCAL), A SURVEY RATE (WEIGHTED AVERAGE RATE) OR A UNION AVERAGE RATE (WEIGHTED UNION AVERAGE RATE). UNION RATE IDENTIFIERS A FOUR LETTER CLASSIFICATION ABBREVIATION IDENTIFIER ENCLOSED IN DOTTED LINES BEGINNING WITH CHARACTERS OTHER THAN ""SU"" OR ""UAVG"" DENOTES THAT THE UNION CLASSIFICATION AND RATE WERE PREVAILING FOR THAT CLASSIFICATION IN THE SURVEY. EXAMPLE: PLUM0198-005 07/01/2014. PLUM IS AN ABBREVIATION IDENTIFIER OF THE UNION WHICH PREVAILED IN THE SURVEY FOR THIS CLASSIFICATION, WHICH IN THIS EXAMPLE WOULD BE PLUMBERS. 0198 INDICATES THE LOCAL UNION NUMBER OR DISTRICT COUNCIL NUMBER WHERE APPLICABLE, I.E., PLUMBERS LOCAL 0198.THE NEXT NUMBER, 005 IN THE EXAMPLE, IS AN INTERNAL NUMBER USED IN PROCESSING THE WAGE DETERMINATION. 07/01/2014 IS THE EFFECTIVE DATE OF THE MOST CURRENT NEGOTIATED RATE,WHICH IN THIS EXAMPLE IS JULY 1, 2014. UNION PREVAILING WAGE RATES ARE UPDATED TO REFLECT ALL RATE Supplementary Conditions 007300- 19 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 CHANGES IN THE COLLECTIVE BARGAINING AGREEMENT(CBA)GOVERNING THIS CLASSIFICATION AND RATE. SURVEY RATE IDENTIFIERS CLASSIFICATIONS LISTED UNDER THE ""SU"" IDENTIFIER INDICATE THAT NO ONE RATE PREVAILED FOR THIS CLASSIFICATION IN THE SURVEY AND THE PUBLISHED RATE IS DERIVED BY COMPUTING A WEIGHTED AVERAGE RATE BASED ON ALL THE RATES REPORTED IN THE SURVEY FOR THAT CLASSIFICATION. AS THIS WEIGHTED AVERAGE RATE INCLUDES ALL RATES REPORTED IN THE SURVEY, IT MAY INCLUDE BOTH UNION AND NON-UNION RATES. EXAMPLE: SULA2012-007 5/13/2014. SU INDICATES THE RATES ARE SURVEY RATES BASED ON A WEIGHTED AVERAGE CALCULATION OF RATES AND ARE NOT MAJORITY RATES. LA INDICATES THE STATE OF LOUISIANA. 2012 IS THE YEAR OF SURVEY ON WHICH THESE CLASSIFICATIONS AND RATES ARE BASED. THE NEXT NUMBER, 007 IN THE EXAMPLE, IS AN INTERNAL NUMBER USED IN PRODUCING THE WAGE DETERMINATION. 5/13/2014 INDICATES THE SURVEY COMPLETION DATE FOR THE CLASSIFICATIONS AND RATES UNDER THAT IDENTIFIER. SURVEY WAGE RATES ARE NOT UPDATED AND REMAIN IN EFFECT UNTIL A NEW SURVEY IS CONDUCTED. UNION AVERAGE RATE IDENTIFIERS Supplementary Conditions 007300- 20 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 CLASSIFICATION(S) LISTED UNDER THE UAVG IDENTIFIER INDICATE THAT NO SINGLE MAJORITY RATE PREVAILED FOR THOSE CLASSIFICATIONS; HOWEVER, 100%OF THE DATA REPORTED FOR THE CLASSIFICATIONS WAS UNION DATA. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG INDICATES THAT THE RATE IS A WEIGHTED UNION AVERAGE RATE. OH INDICATES THE STATE.THE NEXT NUMBER, 0010 IN THE EXAMPLE, IS AN INTERNAL NUMBER USED IN PRODUCING THE WAGE DETERMINATION. 08/29/2014 INDICATES THE SURVEY COMPLETION DATE FOR THE CLASSIFICATIONS AND RATES UNDER THAT IDENTIFIER. A UAVG RATE WILL BE UPDATED ONCE A YEAR, USUALLY IN JANUARY OF EACH YEAR, TO REFLECT A WEIGHTED AVERAGE OF THE CURRENT NEGOTIATED/CBA RATE OF THE UNION LOCALS FROM WHICH THE RATE IS BASED. ---------------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1.) HAS THERE BEEN AN INITIAL DECISION IN THE MATTER?THIS CAN BE: * AN EXISTING PUBLISHED WAGE DETERMINATION Supplementary Conditions 007300- 21 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 * A SURVEY UNDERLYING A WAGE DETERMINATION * A WAGE AND HOUR DIVISION LETTER SETTING FORTH A POSITION ON A WAGE DETERMINATION MATTER * A CONFORMANCE (ADDITIONAL CLASSIFICATION AND RATE) RULING ON SURVEY RELATED MATTERS, INITIAL CONTACT, INCLUDING REQUESTS FOR SUMMARIES OF SURVEYS, SHOULD BE WITH THE WAGE AND HOUR REGIONAL OFFICE FOR THE AREA IN WHICH THE SURVEY WAS CONDUCTED BECAUSE THOSE REGIONAL OFFICES HAVE RESPONSIBILITY FOR THE DAVIS-BACON SURVEY PROGRAM. IF THE RESPONSE FROM THIS INITIAL CONTACT IS NOT SATISFACTORY,THEN THE PROCESS DESCRIBED IN 2.) AND 3.)SHOULD BE FOLLOWED. WITH REGARD TO ANY OTHER MATTER NOT YET RIPE FOR THE FORMAL PROCESS DESCRIBED HERE, INITIAL CONTACT SHOULD BE WITH THE BRANCH OF CONSTRUCTION WAGE DETERMINATIONS. WRITE TO: BRANCH OF CONSTRUCTION WAGE DETERMINATIONS WAGE AND HOUR DIVISION U.S. DEPARTMENT OF LABOR 200 CONSTITUTION AVENUE, N.W. WASHINGTON, DC 20210 2.) IF THE ANSWER TO THE QUESTION IN 1.) IS YES,THEN AN INTERESTED PARTY(THOSE AFFECTED BY THE ACTION) CAN REQUEST Supplementary Conditions 007300- 22 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 REVIEW AND RECONSIDERATION FROM THE WAGE AND HOUR ADMINISTRATOR (SEE 29 CFR PART 1.8 AND 29 CFR PART 7).WRITE TO: WAGE AND HOUR ADMINISTRATOR U.S. DEPARTMENT OF LABOR 200 CONSTITUTION AVENUE, N.W. WASHINGTON, DC 20210 THE REQUEST SHOULD BE ACCOMPANIED BY A FULL STATEMENT OF THE INTERESTED PARTY'S POSITION AND BY ANY INFORMATION (WAGE PAYMENT DATA, PROJECT DESCRIPTION,AREA PRACTICE MATERIAL, ETC.)THAT THE REQUESTOR CONSIDERS RELEVANT TO THE ISSUE. 3.) IF THE DECISION OF THE ADMINISTRATOR IS NOT FAVORABLE, AN INTERESTED PARTY MAY APPEAL DIRECTLY TO THE ADMINISTRATIVE REVIEW BOARD (FORMERLY THE WAGE APPEALS BOARD). WRITE TO: ADMINISTRATIVE REVIEW BOARD U.S. DEPARTMENT OF LABOR 200 CONSTITUTION AVENUE, N.W. WASHINGTON, DC 20210 4.)ALL DECISIONS BY THE ADMINISTRATIVE REVIEW BOARD ARE FINAL. ---------------------------------------------------------------- ---------------------------------------------------------------- Supplementary Conditions 007300- 23 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 END OF GENERAL DECISION ARTICLE 19—PROJECT MANAGEMENT AND COORDINATION SC-19.21 COOPERATION WITH PUBLIC AGENCIES C. For the Contractor's convenience,the following telephone numbers are listed: Public Agencies/Contacts Phone Number City Engineer 361-826-3500 [Design Firm] 361-946-4848 [Designer's name] 361-946-4848 Traffic Engineering 361-826-3547 Police Department 361-882-2600 361-826-1800 (361-826-1818 after Water/Wastewater/Stormwater hours) Gas Department 361-885-6900 (361-885-6942 after hours) Parks & Recreation Department 361-826-3461 Street Department 361-826-1875 City Street Div. for Traffic Signals 361-826-1610 Solid Waste & Brush 361-826-1973 IT Department(City Fiber) 361-826-1956 AEP 1-877-373-4858 AT&T 361-881-2511 (1-800-824-4424 after hours) Grande Communications 1-866-247-2633 Spectrum Communications 1-800-892-4357 Crown Castle Communications 1-888-632-0931 (Network Operations Center) CenturyLink 361-208-0730 W i ndstream 1-800-600-5050 TxDOT Area Office 361-808-2500 Calallen ISD—Transportation 361-242-5983 Supplementary Conditions 007300- 24 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 ARTICLE 23—MINORITY/MBD/DBE PARTICIPATION POLICY ARTICLE 25—SHOP DRAWINGS SC-25.03 CONTRACTOR'S RESPONSIBILITIES A. Provide Shop Drawings for the following items: Specification Section Shop Drawing Description 01 33 01 See Section 0133 01 Submittal Register ARTICLE 26—RECORD DATA SC-26.03 CONTRACTOR'S RESPONSIBILITIES A. Submit Record Data for the following items: Specification Section Record Data Description 01 33 01 See Section 0133 01 Submittal Register END OF SECTION Supplementary Conditions 007300- 25 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 2/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 01 11 00 SUMMARY OF WORK 1.00 GENERAL 1.01 WORK INCLUDED A. Construct Work as described in the Contract Documents. 1. Provide the materials, equipment, and incidentals required to make the Project completely and fully useable. 2. Provide the labor, equipment, tools, and consumable supplies required for a complete Project. 3. The Contract Documents do not indicate or describe all of the Work required to complete the Project. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the OAR. 1.02 DESCRIPTION OF WORK A. Work is described in general, non-inclusive terms as: 1. The project area is approximately 0.20-miles in length, which will improve the existing Callicoatte Road from Up River Road to Interstate Highway 37. This project will also have new driveways along with storm inlets and underground storm infrastructure to improve the drainage flow towards Up River road. The road is currently classified as a Secondary Arterial (A2) by the City of Corpus Christi Urban Transportation Plan (UTP). This classification designates that the street is to consist of a one-hundred-foot (100-foot) right-of-way with a fifty-four foot (54-foot) back of curb to back of curb (BC-BC) to provide four (4)through travel lanes and a center turn lane. This classification also designates that the street is to have and five-foot (5-foot) to eight-foot (8-foot) sidewalks on each side of the street which is not to be installed due to Right-Of-Way limitations and ditches. The street is not indicated on the Corpus Christi Metropolitan Planning Organization (MPO) Bicycle Mobility Plan. The project will also include a one-thousand-two-hundred-foot (1,200-foot) 6"waterline extension from Rehfeld Road along the northside of the access road to Callicoatte Road as well as new sanitary sewer and water infrastructure at Callicoatte Road. 1.03 WORK UNDER OTHER CONTRACTS A. The following items of work are not included in this Contract, but may impact construction scheduling and completion: 1. None B. In the case of a disagreement between the above list and those specified elsewhere in the Contract Documents, the Contractor is to base his Proposal on the most expensive listing. C. Completion of the Work described in this Contract may impact the construction and testing of the items listed above. 1. Coordinate construction activities through the OAR. Summary of Work 011100- 1 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 10/2018 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 2. Pay claims for damages which result from the late completion of the Project or any specified Milestones. 1.04 WORK BY OWNER A. The Owner plans to perform the following items of work which are not included in this Contract, but may impact the construction scheduling and completion: 1. The City Gas Department will adjust and install new gas line conduits and associated service components. The City of Gas Department is not responsible for trenching or backfilling for the gas conduit. Contractor will be required to coordinate work with the OAR. B. Completion of the Work described in this Contract may impact the construction of the items listed above. 1. Coordinate construction activities through the OAR. 2. Pay claims for damages which result from the late completion of the Project or any specified Milestones. C. Owner will provide normal operation and maintenance of the existing facilities during construction, unless otherwise stated. 1.05 CONSTRUCTION OF UTILITIES A. Pay for temporary power, including but not limited to construction cost, meter connection fees, and permits. 1.06 USE PRIOR TO FINAL COMPLETION A. Owner has the right to use or operate any portion of the Project that is ready for use after notifying the Contractor of its intent to do so. B. The execution of Bonds is understood to indicate the consent of the surety to these provisions for use of the Project. C. Provide an endorsement from the insurance carrier permitting use of Project during the remaining period of construction. D. Conduct operations to insure the least inconvenience to the Owner and general public. 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Summary of Work 011100- 2 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 10/2018 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 01 23 10 ALTERNATES AND ALLOWANCES 1.00 GENERAL 1.01 REQUIREMENTS A. Alternates: None B. Allowances: 1. Include specified allowance amount in the Contract Price. 2. The amount of each allowance includes: a. The cost of the product to the Contractor less any applicable trade discounts. b. Delivery to the Site. c. Applicable taxes. 3. Include in the Contract Price all costs for: a. Handling at the Site, including unloading, uncrating, and storage per Article 19 of SECTION 0172 00 GENERAL CONDITIONS. b. Cost for labor and equipment for installation and finishing. c. Cost for related products not specifically listed in the allowance required for installation, including consumable supplies and materials. d. All overhead, profit, and related costs. 4. Assist Owner in the selection of products. a. Identify qualified Suppliers. b. Obtain bids from qualified Suppliers. C. Present available alternates to the Owner through the OAR. Notify OAR of: 1) Any objections to a particular Supplier or product. 2) Effect on the Construction Schedule anticipated by the selection of each option. 3) Cost of each option. 5. Upon selection of the product: a. Purchase and install the product. b. Contractor's responsibilities for products shall be the same as for products selected by the Contractor. 6. Submit a Change Proposal per Article 12 of SECTION 00 72 00 GENERAL CONDITIONS to adjust Contract Price if the net cost of the product is more or less than the specified amount. a. Adjust the unit cost applied to the quantities installed per the method of payment described in Article 17 of SECTION 00 72 00 GENERAL CONDITIONS for products specified as Unit Price Work. Alternates and Allowances 012310- 1 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 5/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 b. Do not perform Work until selection of alternate has been approved by the Owner. C. Provide actual invoices for the materials. C. The Lump Sum Bid Items described as "Allowances" have been set as noted in Section 00 30 01 Bid Form and shall be included in the Total Base Bid of the Bid Form for each Bidder. These Allowances may be used at the Owner's discretion in the event that unforeseen conditions or conflicts are encountered during construction that warrants the use of the Allowance funds. If the use of Allowance funds becomes necessary, the OAR will provide written authorization at a cost negotiated between Owner and Contractor, using unit prices in the Bid Form when applicable. No work is to be performed under the Allowance items without written authorization from the OAR. There is no guarantee that any of these funds will need to be used during the course of the Work. 1.02 DOCUMENT SUBMITTALS A. Provide documents for materials furnished as part of the alternate in accordance with Article 24 of SECTION 00 72 00 GENERAL CONDITIONS. 1.03 DESCRIPTION OF ALTERNATES A. None 1.04 DESCRIPTION OF ALLOWANCES A. Allowance B1—Allowance for Street Lighting: 1. The sum of$10,000.00 upon City approval, Item can be used for unanticipated work not included in the plans. B. Allowance B2—Allowance for Unanticipated Street Improvements: 1. The sum of$27,000.00 upon City approval, Item can be used for unanticipated work not included in the plans. C. Allowance C-Allowance for Unanticipated Stormwater Improvements: 1. The sum of $10,000.00 upon City approval, Item can be used for unanticipated work not included in the plans. D. Allowance D-Allowance for Unanticipated Water Improvements: 1. The sum of $10,000.00 upon City approval, Item can be used for unanticipated work not included in the plans. E. Allowance E -Allowance for Unanticipated Water Improvements: 1. The sum of$5,000.00 upon City approval, Item can be used for unanticipated work not included in the plans. F. Allowance F-Allowance for Unanticipated Wastewater Improvements: 1. The sum of$5,000.00 upon City approval, Item can be used for unanticipated work not included in the plans. G. Allowance G -Allowance for Unanticipated Gas Improvements: Alternates and Allowances 012310- 2 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 5/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 1. The sum of$2,000.00 upon City approval, Item can be used for unanticipated work not included in the plans. 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Alternates and Allowances 012310-3 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 5/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT 1.00 GENERAL 1.01 MEASUREMENT AND BASIS FOR PAYMENTS ON LUMP SUM ITEMS A. Include all cost for completing the Work in accordance with the Contract Documents for lump sum payment items. Include all direct cost for the Work associated with that lump sum item and a proportionate amount for the indirect costs as described in Article 17 of SECTION 00 72 00 GENERAL CONDITIONS for each lump sum item. Include cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the lump sum price. B. Measurement for progress payments will be made on the basis of the earned value for each item shown as a percentage of the cost for the lump sum item as described in Article 17 of SECTION 00 72 00 GENERAL CONDITIONS. Payment at Final Completion will be equal to the total lump sum amount for that item. 1.02 MEASUREMENT AND BASIS FOR PAYMENTS ON UNIT PRICE ITEMS A. Include all cost for completing the Work in accordance with the Contract Documents in unit price payment items. Include all direct cost for the Work associated with that unit price item and a proportionate amount for the indirect costs as described in Article 17 of SECTION 00 72 00 GENERAL CONDITIONS for each unit price item. Include cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the unit price. B. Measurement for payments will be made only for the actual measured and/or computed length, area, solid contents, number, and weight, unless other provisions are made in the Contract Documents. Payment on a unit price basis will not be made for Work outside finished dimensions shown in the Contract Documents. Include cost for waste, overages, and tolerances in the unit price for that line item. Measurement will be as indicated for each unit price item. 1.03 MEASUREMENT AND BASIS FOR PAYMENT FOR BASE BID ITEMS A. Bid Item Al, 131, C1, D1, E1, F1, G1—Mobilization (5% Maximum): 1. Include the following costs in this Bid item: a. Transportation and setup for equipment; b. Transportation and/or erection of all field offices, sheds, and storage facilities; c. Salaries for preparation of documents required before the first Application for Payment; d. Salaries for field personnel assigned to the Project related to the mobilization of the Project; e. Demobilization; and f. Mobilization may not exceed 5 percent of the total Contract Price. Measurement and Basis for Payment 01 29 01- 1 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 5/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 2. Measurement for payment will be made per lump sum on the following basis: When at least 5% of the adjusted contract amount for construction is earned, 75% of the mobilization lump sum bid amount will be eligible for payment, minus retainage. Upon substantial completion of all work under this Contract and removal of all equipment and materials from the Project site, the remaining 25% of the mobilization lump sum bid amount will be eligible for payment, minus retainage. B. Bid Item A2—Bonds and Insurance (Maximum Allowance of 2%) 1. Payment shall include all bonds and insurance required under the Contract Documents. 2. Payment for bonds and insurance will be based on the receipt of documentation of actual costs. Contractor shall furnish satisfactory evidence of the rate or rates paid for all bonds and insurance. Contractor will be reimbursed for the actual cost of unique insurance as required and obtained specifically for this Project, not including the routine and general company insurance policies that are maintained for the course of conducting normal business operations. Contractor will be reimbursed for the actual cost of project specific bonds and insurance, not to exceed the bid amount or the verifiable costs of Project specific bonds and insurance incurred by the Contractor. C. Bid Item A3—Storm Water Pollution Prevention Plan 1. Payment shall include but not be limited to furnishing and submitting the SWPPP to TCEQ and Owner and updating the Plan during the Project as needed. All permits and required fees related to the SWPPP will be included in this item. 2. Measurement for payment will be made per lump sum on the following basis: The initial pay application will include 50%of the lump sum bid amount minus retainage. The balance will be paid according to the percent of construction completion after 50% completion has occurred, minus retainage. D. Bid Item A4—Reinforced Filter Fabric Fence: 1. Include the following costs in this Bid Item: a. Materials, equipment, personnel, labor, and incidentals required for placing, maintaining, and removal, in accordance with the plans. 2. Measuring for payment is as per bid form and specification. E. Bid Item AS—Inlet/Grate Protection Barrier: 1. Include the following costs in this Bid Item: 2. Materials, equipment, personnel, labor, and incidentals required for placing, maintaining, and removal, in accordance with the plans. F. Bid Item A6—Revegetation (Hydromulch): 1. Include the following costs in this Bid Item: a. Materials, equipment, personnel, labor, and incidentals required for placing, maintaining, and removal, in accordance with the plans. 2. Measuring for payment is as per bid form and specification. Measurement and Basis for Payment 01 29 01- 2 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 5/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 G. Bid Item A7—Traffic Control Design Plan By a Professional Engineer: 1. Payment shall be included but not limited for the Contractor to prepare an Owner approved traffic control plan which is signed and sealed by a Texas Licensed Engineer. All costs for review submittals, meetings with the City, landowners, and stakeholders are incidental to this bid item. 2. Measurement for payment is on a lump sum basis. Payment for mobilization will be based on the earned value of Work completed. H. Bid Item A8—Traffic Control Mobilization/Adjustments: 1. This bid item includes the cost for mobilizing all equipment, materials,and labor covered under specification 02 58 02 including removal of all said items. 2. Measurement for payment is on a lump sum basis. Payment for mobilization will be based on the earned value of Work completed. I. Bid Item A9—Traffic Control Devices: 1. Include the following costs in this Bid Item: a. Materials, equipment, personnel, labor, and incidentals required for placing, maintaining, and removal, in accordance with the plans; b. Provision of necessary Traffic Control personnel. 2. Measuring for payment is as per bid form and specifications. J. Bid Item A10—Temporary Pavement: 1. Include the following costs in this Bid Item: a. Materials, equipment, personnel, labor, and incidentals required for placing, maintaining, and removal, of required temporary pavement to maintain one (1) 11-foot wide travel lane. 2. Measuring for payment is as per bid form. K. Bid Item A11—Message Boards for Traffic Control: 1. Include the following costs in this Bid Item: a. Materials, equipment, personnel, labor, and incidentals required for placing, maintaining, and removal, in accordance with the plans; b. Provision of necessary Traffic Control personnel. L. Bid Item Al2—Arrow Boards for Traffic Control: 1. Include the following costs in this Bid Item: a. Materials, equipment, personnel, labor, and incidentals required for placing, maintaining, and removal, in accordance with the plans; b. Provision of necessary Traffic Control personnel. M. Bid Item A13—Ozone Action Day: 1. Include the following costs in this Bid Item: Measurement and Basis for Payment 01 29 01-3 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 5/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 a. Compensation in the amount of the bid unit price for Ozone Action days that occur during the construction duration. 2. Measuring for payment is as per bid form and specification. N. Other Bid Items 1. The basis of measurement and payment for other Bid Items shall be as described in the applicable Specification Sections, Construction Drawings and/or SECTION 00 30 01 BID FORM. 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Measurement and Basis for Payment 01 29 01-4 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 5/2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 0133 01 Submittal Register Specification Paragraph Types of Submittals Required Section Specification Description No. Product Sample or Operations Information Mockup Data 021020 SITE CLEARING&STRIPPING 021040 SITE GRADING 021080 REMOVING ABANDONED STRUCTURES 022020 EXCAVATION&BACKFILL FOR UTILITIES 022021 CONTROL OF GROUND WATER 022022 TRENCH SAFETY FOR EXCAVATIONS 022040 STREET EXCAVATION 022060 CHANNEL EXCAVATION 022080 EMBANKMENT 022100 SELECT MATERIAL 022420 SILT FENCE 025202 SCARIFYING AND RESHAPING BASE COURSE 025205 PAVEMENT REPAIR,CURB,GUTTER,SIDEWALK& DRIVEWAY REPLACEMENT 025210 LIME STABILIZATION 025223 CRUSHED LIMESTONE FLEXIBLE BASE 025404 ASPHALTS,OILS,&EMULSIONS 025412 PRIME COAT 025424 HOT MIX ASPHALT CONCRETE PAVEMENT 025608 INLETS 025610 CONCRETE CURB&GUTTER 025612 CONCRETE SIDEWALKS&DRIVEWAYS 025620 PORTLAND CEMENT CONCRETE PAVEMENT 025807 PAVEMENT MARKINGS(PAINT AND THERMOPLASTIC) 025813 PREFORMED THERMOPLASTIC STRIPING,WORDS& EMBLEMS 025816 RAISED PAVEMENT MARKERS 025818 REFERENCE SPECIFICATION-TxDOT DMS-4200 PAVEMENT MARKERS TxDOT REFLECTORIZED 025828 REFERENCE SPECIFICATION-TxDOT DMS-6130 BITUMINOUS ADHESIVE TxDOT FOR PAVEMENT MARKER 027202 MANHOLES 027203 VACUUM TESTING OF WASTEWATER MANHOLE AND STRUCTURE 027402 REINFORCED CONCRETE PIPE CULVERTS 027404 CONCRETE BOX CULVERTS 028020 SEEDING 028040 SODDING 028300 FENCE RELOCATION 030020 PORTLAND CEMENT CONCRETE 032020 REINFORCING STEEL 038000 CONCRETE STRUCTURES 055420 FRAMES,GRATES,RINGS,&COVERS Submittal Register 01 33 01-1 ] 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road(Bond 2018) 10/2018 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 01 35 00 SPECIAL PROCEDURES 1.00 GENERAL 1.01 CONSTRUCTION SEQUENCE A. Perform the Work as required to complete the entire Project within the Contract Times and in the sequence stipulated below: None B. Work shall be completed within the specified time for these items None C. Consider the sequences, duration limitations, and governing factors outlined in this Section to prepare the schedule for the Work. D. Perform the Work not specifically described in this Section as required to complete the entire Project within the Contract Times. 1.02 PLAN OF ACTION A. Submit a written plan of action for approval for shutting down essential services. These include: 1. Electrical power, 2. Control power, 3. Pipelines or wastewater systems, 4. Communications equipment, and 5. Other designated functions. B. Describe the following in the plan of action: 1. Scheduled dates for construction; 2. Work to be performed; 3. Utilities, piping, or services affected; 4. Length of time the service or utility will be disturbed; 5. Procedures to be used to carry out the Work; 6. Plan of Action to handle emergencies; 7. List of manpower, equipment, and ancillary supplies; 8. Backups for key pieces of equipment and key personnel; 9. Contingency plan that will be used if the original schedule cannot be met; and C. Submit plan 2 weeks [1 month] prior to beginning the Work. Special Procedures 013500- 1 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 10/2018 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 1.03 CRITICAL OPERATIONS - NONE 1.04 OWNER ASSISTANCE A. The Owner will assist the Contractor in draining the existing pipelines as much as possible through existing blow-off valves. The Contractor will be responsible for providing dewatering pumps, etc. required to completely dewater the facilities and handle any leakage past closed valves,gates or adjacent structures. 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Special Procedures 013500- 2 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 10/2018 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 01 50 00 TEMPORARY FACILITIES AND CONTROLS 1.00 GENERAL 1.01 WORK INCLUDED A. Provide temporary facilities, including OPT's field office and the Contractor's field offices, storage sheds, and temporary utilities needed to complete the Work. B. Install and maintain temporary Project identification signs. Provide temporary on-site informational signs to identify key elements of the construction facilities. Do not allow other signs to be displayed. 1.02 QUALITY ASSURANCE (NOT USED) 1.03 DELIVERY AND STORAGE A. Arrange transportation, loading, and handling of temporary buildings and sheds. 1.04 JOB CONDITIONS A. Locate buildings and sheds at the Site as indicated or as approved by the OPT. B. Prepare the Site by removing trees, brush, or debris and performing demolition or grubbing needed to clear a space adequate for the structures. C. Pay for the utilities used by temporary facilities during construction. D. Provide each temporary service and facility ready for use at each location when the service or facility is first needed to avoid delay in the performance of the Work. Provide OPT's field office complete and ready for occupancy and use within 7 days of the Notice to Proceed. E. Maintain, expand as required, and modify temporary services and facilities as needed throughout the progress of the Work. F. Remove services and facilities when approved by the OAR. G. Operate temporary facilities in a safe and efficient manner. 1. Restrict loads on temporary services or facilities to within their designed or designated capacities. 2. Provide sanitary conditions. Prevent public nuisance or hazardous conditions from developing or existing at the Site. 3. Prevent freezing of pipes, flooding, or the contamination of water. 4. Maintain Site security and protection of the facilities. 1.05 OPTIONS A. Construction offices may be prefabricated buildings on skids or mobile trailers. B. Storage sheds may be prefabricated buildings on skids or truck trailers. Temporary Facilities and Controls 015000- 1 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 8/2019 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 2.00 PRODUCTS 2.01 TEMPORARY FIELD OFFICES— FIELD OFFICE NOT REQUIRED A. Field Office is not required for this project, however, if Contractor is to furnish a Field Office for the project it must meet or exceed the requirements of this Section. The location of the field office must be beyond all right-of-way and located on property that the Contractor has obtained use of. There will be no separate pay item for the field office. B. Furnish a field office of adequate size for Contractor's use. Provide conference room space for a minimum of 10 people. C. Other trades may provide their own offices only when space is available at the Site, and the OPT agrees to its size, condition, and location. 2.02 TEMPORARY STORAGE BUILDINGS A. Furnish storage buildings of adequate size to store any materials or equipment delivered to the Site that might be affected by weather. 2.03 TEMPORARY SANITARY FACILITIES A. Provide sanitary facilities at the Site from the commencement of the Project until Project conclusion. Maintain these facilities in a clean and sanitary condition at all times, and comply with the requirements of the local health authority. On large sites, provide portable toilets at such locations that no point in the Site shall be more than 600 feet from a toilet. B. Use these sanitary facilities. Do not use restrooms within existing or Owner-occupied buildings. 2.04 TEMPORARY HEAT A. Provide heating devices needed to protect buildings during construction. Provide fuel needed to operate the heating devices and attend the heating devices at all times they are in operation, including overnight operations. 2.05 TEMPORARY UTILITIES A. Provide the temporary utilities for administration, construction, testing, disinfection, and start-up of the Work, including electrical power, water, and telephone. Pay all costs associated with furnishing temporary utilities. 1. Provide a source of temporary electrical power of adequate size for construction procedures. a. Use existing power systems where spare capacity is available. Provide temporary power connections that do not adversely affect the existing power supply. Submit connections to the OAR for approval prior to installation. b. Provide electrical pole and service connections that comply with Laws and Regulations and the requirements of the power company. Temporary Facilities and Controls 015000- 2 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 8/2019 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 2. Provide telephone service to the Site and install telephones inside the Contractor's and the OPT's field office. 2.06 WATER FOR CONSTRUCTION A. Provide temporary water. Potable water may be purchased from the Owner by obtaining a water meter from the Owner and transporting water from a water hydrant. Non-potable water may be used for hydraulic testing of non-potable basins or pipelines. Include the cost of water in the Contract Price. B. Contractor must comply with the City of Corpus Christi's Water Conservation and Drought Contingency Plan as amended (the "Plan"). This includes implementing water conservation measures established for changing conditions. The City Engineer will provide a copy of the Plan to Contractor at the pre-construction meeting. The Contractor will keep a copy of the Plan on the Site throughout construction. 3.00 EXECUTION 3.01 LOCATION OF TEMPORARY FACILITIES A. Locate temporary facilities in areas approved by the OAR. Construct and install signs at locations approved by the OAR. Install informational signs so they are clearly visible. 3.02 PROJECT IDENTIFICATION AND SIGNS A. The Owner will furnish two Project signs to be installed by the Contractor. The signs must be installed before construction begins and will be maintained throughout the Project period by the Contractor. The locations of the signs will be determined in the field by the OAR. 3.03 TEMPORARY LIGHTING A. Provide temporary lighting inside buildings once buildings are weatherproof. B. Provide lighting that is adequate to perform Work within any space. Temporary lights may be removed once the permanent lighting is in service. C. Provide portable flood lights at any time that Work will be performed outside the structure at night. Provide adequate lighting at any location Work is being performed. 3.04 DRINKING WATER A. Provide all field offices with potable water. Provide a dispenser and cooling apparatus if bottled drinking water is provided. B. Pay for water services and maintain daily. 3.05 CONSTRUCTION FENCE A. Install and maintain a construction fence around the Site and off-site storage yards. Fence must be a minimum 6 feet high chain link construction unless shown otherwise. Provide gates with padlocks. Temporary Facilities and Controls 015000-3 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 8/2019 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 3.06 REMOVAL OF TEMPORARY FACILITIES A. Remove temporary buildings, sheds, and utilities at the conclusion of the Project and restore the Site to original condition or finished in accordance with the Drawings. B. Remove informational signs upon completion of construction. C. Remove Project identification signs, framing, supports, and foundations upon completion of the Project. 3.07 MAINTENANCE AND JANITORIAL SERVICE A. Provide janitorial service (sweeping/mopping) for the field office on a weekly basis or as requested. Empty trash receptacles daily or as needed. B. Maintain signs and supports in a neat, clean condition. Repair damage to structures, framings, or signs. C. Repair any damage to Work caused by placement or removal of temporary signage. D. Service, maintain, and replace, if necessary, the field office computer equipment throughout the Project as required including replacement cartridges for all office equipment. END OF SECTION Temporary Facilities and Controls 015000-4 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 8/2019 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 01 57 00 TEMPORARY CONTROLS 1.00 GENERAL 1.01 WORK INCLUDED A. Provide labor, materials, equipment, and incidentals necessary to construct temporary facilities to provide and maintain control over environmental conditions at the Site. Remove temporary facilities when no longer needed. B. Construct temporary impounding works, channels, diversions, furnishing and operation of pumps, installing piping and fittings, and other construction for control of conditions at the Site. Remove temporary controls at the end of the Project. C. Provide a Storm Water Pollution Prevention Plan (SWPPP) as required by Texas Pollutant Discharge Elimination System (TPDES) General Permit No. TXR150000 for stormwater discharges from construction activities as applicable to the nature and size of the Project. Comply with all requirements of the Texas Commission on Environmental Quality(TCEQ)and Laws and Regulations. File required legal notices and obtain required permits prior to beginning any construction activity. D. Provide labor, materials, equipment, and incidentals necessary to prevent stormwater pollution for the duration of the Project. Provide and maintain erosion and sediment control structures as required to preventive sediment and other pollutants from the Site from entering any stormwater system including open channels. Remove pollution control structures when no longer required to prevent stormwater pollution. 1.02 QUALITY ASSURANCE A. Construct and maintain temporary controls with adequate workmanship using durable materials to provide effective environmental management systems meeting the requirements of the Contract Documents and Laws and Regulations. Use materials that require minimal maintenance to prevent disruption of construction activities while providing adequate protection of the environment. B. Periodically inspect systems to determine that they are meeting the requirements of the Contract Documents. 1.03 DOCUMENT SUBMITTAL A. Provide documents requiring approval by the OPT as Shop Drawings in accordance with Article 25 of SECTION 00 72 00 GENERAL CONDITIONS. B. Provide copies of notices, records, and reports required by the Contract Documents or Laws and Regulations as Record Data in accordance with Article 26 of SECTION 00 72 00 GENERAL CONDITIONS. 1.04 STANDARDS A. Provide a SWPPP that complies with all requirements of TPDES General Permit No. TXR150000 and any other applicable Laws and Regulations. Temporary Controls 015700- 1 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 8/2019 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 B. Perform Work to comply with the City of Corpus Christi Code of Ordinances, Part III, Chapter 14, Article X - titled "STORM WATER QUALITY MANAGEMENT PLANS" and any other applicable Laws and Regulations. 1.05 PERMITS A. As applicable, submit the following to the TCEQ and the Operator of any Municipal Separate Storm Sewer System (MS4) receiving stormwater discharges from the Site: 1. Notice of Intent (NOI) at least 48 hours prior to beginning construction activity. Construction activity may commence 24 hours after the submittal of an electronic NOI. 2. Notice of Change (NOC) letter when relevant facts or incorrect information was submitted in the NOI, or if relevant information in the NOI changes during the course of construction activity. 3. Notice of Termination (NOT) when the construction Project has been completed and stabilized. B. Post a copy of the NOI at the Site in a location where it is readily available for viewing by the general public and as required by Laws and Regulations prior to starting construction activities and maintain the posting until completion of the construction activities. C. Maintain copies of a schedule of major construction activities, inspection reports, and revision documentation with the SWPPP. 1.06 STORMWATER POLLUTION CONTROL A. Comply with the current requirements of TPDES General Permit No. TXR150000 as set forth by the TCEQ for the duration of the Project as applicable to the nature of the work and the total disturbed area: 1. Develop a SWPPP meeting all requirements of the TPDES General Permit. 2. Submit of a Notice of Intent to the TCEQ. 3. Develop and implement appropriate Best Management Practices as established by local agencies of jurisdiction. 4. Provide all monitoring and/or sampling required for reporting to the TCEQ. 5. Submit reports to the TCEQ as required as a condition of the TPDES General Permit. 6. Submit copies of the reports to the Designer as Record Data in accordance with Article 26 of SECTION 00 72 00 GENERAL CONDITIONS. 7. Retain copies of these documents at the Site at all times for review and inspection by the OPT or regulatory agencies. Post a copy of the permit as required by Laws and Regulations. 8. Assume sole responsibility for implementing, updating, and modifying the TPDES General Permit per Laws and Regulations for the SWPPP and Best Management Practices. B. Use forms required by the TCEQ to file the Notice of Intent. Submit the Notice of Intent at least 2 days prior to the start of construction. Develop the SWPPP prior to submitting the Temporary Controls 015700- 2 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 8/2019 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Notice of Intent. Provide draft copies of the Notice of Intent,SWPPP,and any other pertinent TCEQ submittal documents to Owner for review prior to submittal to the TCEQ. C. Return any property disturbed by construction activities to either specified conditions or pre- construction conditions as set forth in the Contract Documents. Provide an overall erosion and sedimentation control system that will protect all undisturbed areas and soil stockpiles/spoil areas. Implement appropriate Best Management Practices and techniques to control erosion and sedimentation and maintain these practices and techniques in effective operating condition during construction. Permanently stabilize exposed soil and fill as soon as practical during the Work. D. Assume sole responsibility for the means, methods, techniques, sequences, and procedures for furnishing, installing, and maintaining erosion and sedimentation control structures and procedures and overall compliance with the TPDES General Permit. Modify the system as required to effectively control erosion and sediment. E. Retain copies of reports required by the TPDES General Permit for 3 years from date of Final Completion. 1.07 POLLUTION CONTROL A. Prevent the contamination of soil, water, or atmosphere by the discharge of noxious substances from construction operations. Provide adequate measures to prevent the creation of noxious air-borne pollutants. Prevent dispersal of pollutants into the atmosphere. Do not dump or otherwise discharge noxious or harmful fluids into drains or sewers, nor allow noxious liquids to contaminate public waterways in any manner. B. Provide equipment and personnel and perform emergency measures necessary to contain any spillage. 1. Contain chemicals in protective areas and do not dump on soil. Dispose of such materials at off-site locations in an acceptable manner. 2. Excavate contaminated soil and dispose at an off-site location if contamination of the soil does occur. Fill resulting excavations with suitable backfill and compact to the density of the surrounding undisturbed soil. 3. Provide documentation to the Owner which states the nature and strength of the contaminant, method of disposal, and the location of the disposal site. 4. Comply with Laws and Regulations regarding the disposal of pollutants. C. Groundwater or run-off water which has come into contact with noxious chemicals, sludge, or sludge-contaminated soil is considered contaminated. Contaminated water must not be allowed to enter streams or water courses, leave the Site in a non-contained form, or enter non-contaminated areas of the Site. 1. Pump contaminated water to holding ponds constructed by the Contractor for this purpose, or discharge to areas on the interior of the Site, as designated by the OAR. 2. Construct temporary earthen dikes or take other precautions and measures as required to contain the contaminated water and pump to a designated storage area. 3. Wash any equipment used for handling contaminated water or soil within contaminated areas three times with uncontaminated water prior to using such equipment in an Temporary Controls 015700-3 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 8/2019 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 uncontaminated area. Dispose of wash water used to wash such equipment as contaminated water. 1.08 EARTH CONTROL A. Remove excess soil, spoil materials, and other earth not required for backfill at the time of generation. Control stockpiled materials to eliminate interference with Contractor and Owner's operations. B. Dispose of excess earth off the Site. Provide written approval from the property owner for soils deposited on private property. Obtain approval of the Owner if this disposal impacts the use of Site or other easements. 1.09 OZONE ADVISORY DAYS A. Do not conduct roofing, priming, or hot-mix paving operations, except for repairs, on days the City Engineer has notified Contractor that an ozone advisory is in effect. An extension of time will be allowed for each day for which priming or hot mix paving was scheduled, crews were prepared to perform this Work and the City Engineer issued ozone alert prevents this Work. Contractor will be compensated at the unit price indicated in the Bid for each day for which an extension of time was granted due to an ozone alert. 1.10 MANAGEMENT OF WATER A. Manage water resulting from rains or ground water at the Site. Maintain trenches and excavations free of water at all times. B. Lower the water table in the construction area by acceptable means if necessary to maintain a dry and workable condition at all times. Provide drains, sumps, casings, well points, and other water control devices as necessary to remove excess water. C. Provide continuous operation of water management actions. Maintain standby equipment to provide proper and continuous operation for water management. D. Ensure that water drainage does not damage adjacent property. Divert water into the same natural watercourse in which its headwaters are located, or other natural stream or waterway as approved by the Owner. Assume responsibility for the discharge of water from the Site. E. Remove the temporary construction and restore the Site in a manner acceptable to the OAR and to match surrounding material at the conclusion of the Work. 1.11 DEWATERING A. This item is considered subsidiary for all dewatering methods other than "well pointing" to the appropriate bid items as described in the Bid Form where dewatering is needed to keep the excavation dry, as approved by the Designer, and shall include all costs to provide a dry foundation for the proposed improvements. B. Storm water that enters an excavation can be pumped out as long as care is taken to minimize solids and mud entering the pump suction and flow is pumped to a location that allows for sheet flow prior to entering a storm water drainage ditch or storm water inlet. Temporary Controls 015700-4 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 8/2019 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 C. An alternative to sheet flow is to pump storm water to an area where ponding occurs naturally without leaving the designated work area or by a manmade berm(s) prior to entering the storm water system. Sheet flow and ponding is to allow solids screening and/or settling prior to entering a storm water conduit or inlet. D. Storm water or groundwater shall not be discharged to private property without permission. It is the intent that Contractor discharges groundwater primarily into the existing storm water system, provided that the quality of groundwater is equal to or better than the receiving stream,the Corpus Christi Bay. E. Testing of groundwater quality is to be performed by the Contractor, at the Contractor's expense, prior to commencing discharge and shall be retested by the Contractor, at the Contractor's expense, a minimum of once a week. Contractor shall coordinate with the Owner on all testing. Tests will also be performed as each new area of construction is started. F. Another option for disposal of groundwater by Contractor would include pumping to the nearest wastewater system. If discharging to temporary holding tanks and trucking to a wastewater or wastewater plant, the costs for these operations shall be negotiated. Other groundwater disposal alternatives or solutions may be approved by the Designer on a case by case basis. G. Prior to pumping groundwater from a trench to the wastewater system the Contractor shall contact Wastewater Pre-treatment Coordinator at 826-1817 to obtain a "no cost" permit from the Owner's Waste Water Department. Contractor will pay for any water quality testing or water analysis cost required. The permit will require an estimate of groundwater flow. Groundwater flow can be estimated by boring a hole or excavating a short trench then record water level shortly after completion, allow to sit overnight, record water level again, pump hole or trench dry to a holding tank or vacuum truck then record how long it takes to fill to original level and overnight level. 1.12 DISPOSAL OF CONTAMINATED GROUNDWATER A. An allowance will be included in the Bid for the unanticipated disposal of contaminated groundwater. This allowance may not be needed but is provided in case contaminated groundwater is encountered during the course of the Project and does not meet the water quality requirements for discharge into the storm water or wastewater systems. This allowance includes all materials, tools, equipment, labor, transportation, hauling, coordination, and proper disposal of the contaminated water at an approved landfill, deep water injection well, or other site as agreed to by the Designer. Suggested disposal facilities would be [US Ecology (USET) in Robstown, Texas or Texas Molecular in Corpus Christi, Texas]. B. The payment for this Work will be based on the Contractor's actual costs and will be negotiated. Payment will not include costs associated with routine dewatering, which is considered subsidiary to the appropriate bid items as described in Paragraph 1.11. 1.13 DISPOSAL OF HIGHLY CHLORINATED WATER A. Dispose of water used for testing, disinfection, and line flushing. Comply with Owner's requirements and Laws and Regulation regarding the disposal of contaminated water, including water with levels of chlorine,which exceed the permissible limits for discharge into wetlands or environmentally sensitive areas. Comply with the requirements of all regulatory Temporary Controls 015700-5 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 8/2019 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 agencies in the disposal of all water used in the Project. Include a description and details for disposal of this water in a Plan of Action per SECTION 01 35 00 SPECIAL PROCEDURES. Do not use the Owner's wastewater system for disposal of contaminated water. 1.14 WINDSTORM CERTIFICATION A. All affected materials and installation shall comply with Texas Department of Insurance Requirements for windstorm resistant construction for design wind speed as required by the current version of the International Building Code (IBC). When applicable, [Contractor] [Owner] shall be responsible for contracting with a licensed structural engineer in the State of Texas to perform all inspections and provide documentation for windstorm certification to the Texas Board of Insurance. The Contractor shall be responsible for providing all necessary design/assembly documentation for all new windows, doors, louvers, etc. to the windstorm engineer/inspectors required to conform with the requirements of the Texas Department of Insurance. 2.00 PRODUCTS 2.01 MATERIALS A. Provide materials that comply with Laws and Regulations. 3.00 EXECUTION 3.01 CONSTRUCTING, MAINTAINING AND REMOVING TEMPORARY CONTROLS A. Construct temporary controls in accordance with Laws and Regulations. B. Maintain controls in accordance with regulatory requirements where applicable, or in accordance with the requirements of the Contract Documents. C. Remove temporary controls when no longer required, but before the Project is complete. Correct any damage or pollution that occurs as the result of removing controls while they are still required. END OF SECTION Temporary Controls 015700-6 18010A Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road (Bond 2018) Rev 8/2019 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 021020 SITE CLEARING AND STRIPPING 1. DESCRIPTION This specification shall govern all work necessary for clearing, grubbing and stripping of objectionable matter as required to complete the project, and shall include removing and disposing of trees, stumps, brush, roots, vegetation, rubbish and other objectionable matter from the project site. 2. CONSTRUCTION METHODS The site shall be cleared of all trees, stumps, brush, roots, vegetation, rubbish and other objectionable matter as indicated on the drawings and/or as directed by the Engineer or his designated representative. Tree stumps and roots shall be grubbed to a minimum depth of 2 feet below natural ground or 2 feet below base of subgrade, whichever is lower. Areas that underlie compacted backfill shall be stripped of all vegetation, humus and other objectionable matter encountered within the top six (6) inches of the soil. All material removed from the site under this operation shall become the Contractor's responsibility. The material shall be disposed of either at a disposal site indicated on the drawings or at a disposal site obtained by the Contractor. 3. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, site clearing and stripping or clear right-of-way shall be measured by the acre. Payment shall be full compensation for all labor, equipment, tools and incidentals necessary for removing,handling, and disposing of objectionable matter from the site as indicated above. 021020 Page 1 of 1 Rev.1030-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 021040 SITE GRADING 1. DESCRIPTION This specification shall govern all work necessary for backfill and grading of the site to complete the project. 2. CONSTRUCTION METHODS Prior to site grading, the site shall be cleared in accordance with City Standard Specification Section 021020 "Site Clearing and Stripping". Unless specified otherwise on the drawings, the existing surface shall be loosened by scarifying or plowing to a depth of not less than six (6) inches. The loosened material shall be recompacted with fill required to bring the site to the required grades and elevations indicated on the plans. Fill shall be uniform as to material, density and moisture content. Fill shall be free of large clods, large rocks, organic matter, and other objectionable material. No fill that is placed by dumping in a pile or windrow shall be incorporated into a layer in that position; all such piles and windrows shall be moved by blading or similar method. All fill shall be placed in layers approximately parallel to the finish grade in layers not to exceed six (6) inches of uncompacted depth, unless indicated otherwise on drawings. The fill shall be compacted to a density which approximates that of natural ground unless indicated otherwise on drawings. The Engineer may order proof rolling to test the uniformity of compaction. All irregularities, depressions and soft spots that develop shall be corrected by the Contractor. Excess material from excavation, which is not incorporated into the site as fill, shall be become property of the Contractor and disposed of away from the job site, unless indicated otherwise on the drawings. 3. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, site grading shall not be measured for pay,but shall be considered subsidiary to other work. 021040 Page 1 of 1 Rev.1030-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 021080 REMOVING ABANDONED STRUCTURES 1. DESCRIPTION This specification shall provide for the demolition,removal and disposal of abandoned structures or portions of abandoned structures, as noted on the drawings, and shall include all excavation and backfilling necessary to complete the removal. The work shall be done in accordance with the provisions of these specifications. 2. METHOD OF REMOVAL Culverts or Sewers. Pipe shall be removed by careful excavation of all dirt on top and the sides in such manner that the pipe will not be damaged. Removal of sewer appurtenances shall be included for removal with the pipe. Those pipes which are deemed unsatisfactory for reuse by the Engineer may be removed in any manner the Contractor may select. Concrete Structures. Unwanted concrete structures or concrete portions of structures shall be removed to the lines and dimensions shown on the drawings, and these materials shall be disposed of as shown on the drawings or as directed by the Engineer. Any portion of the existing structure outside of the limits designated for removal which is damaged by the Contractor's operations shall be restored to its original condition at the Contractor's entire expense. Explosives shall not be used in the removal of portions of the existing structure unless approved by the Engineer, in writing. Portions of the abandoned structure shall be removed to the lines and dimensions shown on the plans, and these materials shall be disposed of as shown on the drawings or as directed by the Engineer. Any portion of the existing structure, outside of the limits designated for removal, damaged during the operations of the Contractor, shall be restored to its original condition entirely at the Contractor's expense. Explosives shall not be used in the removal of portions of the existing structure unless approved by the Engineer, in writing. Concrete portions of structures below the permanent ground line, which will not interfere in any manner with the proposed construction, may be left in place, but removal shall be carried at least five (5) feet below the permanent ground line and neatly squared off. Reinforcement shall be cut off close to the concrete. Steel Structures. Steel structures or steel portions of structures shall be dismantled in sections as determined by the Engineer. The sections shall be stored if the members are to be salvaged and reused. Rivets and bolts connecting steel railing members, steel beams of beam spans and steel stringers of truss spans, shall be removed by butting the heads with a "cold cut" and punching or drilling from the hole, or by such other method that will not injure the members for re-use and will meet the approval of the Engineer. The removal of rivets and bolts from connections of truss 021080 Page 1 of 3 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 members, bracing members, and other similar members in the structure will not be required unless specifically called for on the plans or special provisions, and the Contractor shall have the option of dismantling these members by flame-cutting the members immediately adjacent to the connections. Flame-cutting will not be permitted, however, when the plans or special provisions call for the structure unit to be salvaged in such manner as to permit re-erection. In such case, all members shall be carefully matchmarked with paint in accordance with diagrams furnished by the Engineer prior to dismantling, and all rivets and bolts shall be removed from the connections in the manner specified in the first portion of this paragraph. Timber Structures. Timber structures or timber portions of structures to be reused shall be removed in such manner as to damage the timber for further use as little as possible. All bolts and nails shall be removed from such lumber as deemed salvable by the Engineer. Unless otherwise specified on the drawings, timber piles shall be either pulled or cut off at the point not less than five (5) feet below ground line, with the choice between these two methods resting with the Contractor,unless otherwise specified. Brick or Stone Structures. Unwanted brick or stone structures or stone portions of structures shall be removed. Portions of such structures below the permanent ground line, which will not in any manner interfere with the proposed construction, may be left in place, but removal shall be carried at least five(5)feet below the permanent ground line and neatly squared off. Salvage. All material such as pipe, timbers,railings, etc.,which the Engineer deems as salvable for reuse, and all salvaged structural steel, shall be delivered to a designated storage area. Materials, other than structural steel, which are not deemed salvable by the Engineer, shall become the property of the Contractor and shall be removed to suitable disposal sites off of the right-of-way arranged for by the Contractor, or otherwise disposed of in a manner satisfactory to the Engineer. Where temporary structures are necessary for a detour adjacent to the present structure, the Contractor will be permitted to use the material in the old structure for the detour structure, but he shall dismantle and stack or dispose of the material as required above as soon as the new structure is opened for traffic. Backfill. All excavations made in connection with this specification and all openings below the natural ground line caused by the removal of abandoned structures or portions thereof shall be backfilled to the level of the original ground line, unless otherwise provided on the drawings. Backfill in accordance with applicable requirements of Sections 022020 "Excavation and Backfill for Utilities" and 022080 "Embankment". All open ends of abandoned pipe or other structures shall be filled or plugged as specified. That portion of the backfill which will support any portion of the roadbed, embankment, levee, or other structural feature shall be placed in layers of the same depth as those required for placing 021080 Page 2 of 3 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 embankment, maximum 10" loose lifts unless otherwise specified. Material in each layer shall be wetted uniformly, if required, and shall be compacted to a minimum of 95% Standard Proctor density, unless otherwise specified. In places inaccessible to blading and rolling equipment, mechanical or hand tamps or rammers shall be used to obtain the required compaction. That portion of the backfill which will not support any portion of the roadbed, embankment, or other structural feature shall be placed as directed by the Engineer in such manner and to such state of compaction as will preclude objectionable amount of settlement, maximum 10" loose lifts to minimum 95% Standard Proctor density unless otherwise specified. 3. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, the work governed by this specification shall not be measured for pay,but shall be subsidiary to the project. 021080 Page 3 of 3 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 022020 EXCAVATION AND BACKFILL FOR UTILITIES 1. DESCRIPTION This specification shall govern all work for excavation and backfill for utilities required to complete the project. 2. CONSTRUCTION (1) Unless otherwise specified on the drawings or permitted by the Engineer, all pipe and conduit shall be constructed in open cut trenches with vertical sides. Trenches shall be sheathed and braced as necessary throughout the construction period. Sheathing and bracing shall be the responsibility of the Contractor (refer to Section 022022 "Trench Safety for Excavations" of the City Standard Specifications). Trenches shall have a maximum width of one foot beyond the horizontal projection of the outside surfaces of the pipe and parallel thereto on each side unless otherwise specified. The Contractor shall not have more than 200 feet of open trench left behind the trenching operation and no more than 500 feet of ditch behind the ditching machine that is not compacted as required by the plans and specifications. No trench or excavation shall remain open after working hours. For all utility conduit and sewer pipe to be constructed in fill above natural ground, the embankment shall first be constructed to an elevation not less than one foot above the top of the pipe or conduit, after which excavation for the pipe or conduit shall be made. If quicksand, muck, or similar unstable material is encountered during the excavation, the following procedure shall be used unless other methods are called for on the drawings. If the unstable condition is a result of ground water,the Contractor,prior to additional excavation, shall control it. After stable conditions have been achieved,unstable soil shall be removed or stabilized to a depth of 2 feet below the bottom of pipe for pipes 2 feet or more in height;and to a depth equal to the height of pipe, 6 inches minimum,for pipes less then 2 feet in height. Such excavation shall be carried at least one foot beyond the horizontal limits of the structure on all sides. All unstable soil so removed shall be replaced with suitable stable material, placed in uniform layers of suitable depth as directed by the Engineer,and each layer shall be wetted, if necessary, and compacted by mechanical tamping as required to provide a stable condition. For unstable trench conditions requiring outside forms, seals, sheathing and bracing, any additional excavation and backfill required shall be done at the Contractor's expense. (2) Shaping of Trench Bottom. The trench bottom shall be undercut a minimum depth sufficient to accommodate the class of bedding indicated on the plans and specifications. 022020 Page 1 of 4 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 (3) Dewatering Trench. Pipe or conduit shall not be constructed or laid in a trench in the presence of water. All water shall be removed from the trench sufficiently prior to the pipe or conduit planing operation to insure a relatively dry (no standing water), firm bed. The trench shall be maintained in such dewatered condition until the trench has been backfilled to a height at lease one foot above the top of pipe. Removal of water may be accomplished by bailing,pumping,or by installation of well-points,as conditions warrant. Removal of well- points shall be at rate of 1/3 per 24 hours (every third well-point). The Contractor shall prevent groundwater from trench or excavation dewatering operations from discharging directly into the storm water system. Groundwater from dewatering operations shall be sampled and tested, if applicable, and disposed of, in accordance with City Standard Specification Section 022021 "Control of Ground Water". (4) Excavation in Streets. Excavation in streets,together with the maintenance of traffic where specified, and the restoration of the pavement riding surface, shall be in accordance with drawing detail or as required by other applicable specifications. (5) Removing Abandoned Structures. When abandoned masonry structures or foundations are encountered in the excavation, such obstructions shall be removed for the full width of the trench and to a depth one foot below the bottom of the trench. When abandoned inlets or manholes are encountered and no plan provision is made for adjustment or connection to the new utility,such manholes and inlets shall be removed completely to a depth one foot below the bottom of the trench. In each instance,the bottom to the trench shall be restored to grade by backfilling and compacting by the methods provided hereinafter for backfill. Where the trench cuts through utility lines which are known to be abandoned, these lines shall be cut flush with the sides of the trench and blocked with a concrete plug in a manner satisfactory to the Engineer. (6) Protection of Utilities. The Contractor shall conduct his work such that a reasonable minimum of disturbance to existing utilities will result. Particular care shall be exercised to avoid the cutting or breakage of water and gas lines. Such lines,if broken, shall be restored promptly by the Contractor. When active wastewater lines are cut in the trenching operations, temporary flumes shall be provided across the trench while open, and the lines shall be restored when the backfilling has progressed to the original bedding line of the sewer so cut. The Contractor shall inform utility owners sufficiently in advance of the Contractor's operations to enable such utility owners to reroute, provide temporary detours, or to make other adjustments to utility lines in order that the Contractor may proceed with his work with a minimum of delay. The Contractor shall not hold the City liable for any expense due to delay or additional work because of utility adjustments or conflicts. (7) Excess Excavated Material. All materials from excavation not required for backfilling the trench shall be removed by the Contractor from the job site promptly following the completion of work involved. 022020 Page 2 of 4 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 (8) Backfill A. Backfill Procedure Around Pipe (Initial Backfill) All trenches and excavation shall be backfilled as soon as is practical after the pipes or conduits are properly laid. In addition to the specified pipe bedding material, the backfill around the pipe as applicable shall be granular material as shown on the standard details or as described in the applicable specification section, and shall be free of large hard lumps or other debris. If indicated on the plans, pipe shall be encased with cement-stabilized sand backfill as described below. The backfill shall be deposited in the trench simultaneously on both sides of the pipe for the full width of the trench,in layers not to exceed ten(10)inches (loose measurement), wetted if required to obtain proper compaction, and thoroughly compacted by use of mechanical tampers to a density comparable to the adjacent undisturbed soil or as otherwise specified on the plans,but not less than 95%Standard Proctor density. A thoroughly compacted material shall be in place between the external wall of the pipe and the undisturbed sides of the trench and to a level twelve (12)inches above the top of the pipe. B. Backfill Over One Foot Above Pipe Final Backfill) UNPAVED AREAS: The backfill for that portion of trench over one(1)foot above the pipe or conduit not located under pavements (including waterlines, gravity wastewater lines, wastewater force mains and reinforced concrete storm water pipe) shall be imported select material or clean, excess material from the excavation meeting the following requirements: Free of hard lumps, rock fragments, or other debris, No clay lumps greater than 2" diameter Moisture Content: +/-3% Backfill material shall be placed in layers not more than ten (10) inches in depth (loose measurement),wetted if required to obtain proper compaction,and thoroughly compacted by use of mechanical tampers to the natural bank density but not less than 95%Standard Proctor density,unless otherwise indicated. Flooding of backfill is not allowed. Jetting of backfill may only be allowed in sandy soils and in soils otherwise approved by the Engineer. Regardless of backfill method, no lift shall exceed 10 inches and density shall not be less than 95% Standard Proctor density. A period of not less than twenty-four(24) hours shall elapse between the time of jetting and the placing of the top four (4) feet of backfill. If jetting is used, the top four (4) feet of backfill shall be placed in layers not more than 10 inches in depth (loose measurement), wetted if required to obtain proper compaction, and thoroughly compacted by use of mechanical tampers to the natural bank density but not less than 95% Standard Proctor density (ASTM D698). PAVED AREAS: At utility line crossings under pavements (including waterlines, gravity wastewater lines, wastewater force mains, and reinforced concrete storm water pipe), and where otherwise indicated on the drawings, trenches shall be backfilled as shown below: From top of initial backfill (typically twelve (12)inches above top of the pipe)to three (3) feet below bottom of road base course, backfill shall be select material meeting the requirements of 022100 "Select Material". 022020 Page 3 of 4 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Asphalt Roadways The upper three (3) feet of trench below the road base course shall be backfilled to the bottom of the road base course with cement-stabilized sand containing a minimum of 2 sacks of Standard Type I Portland cement per cubic yard of sand and compacted to not less than 95% Standard Proctor density. Concrete Roadways The Contractor may elect to backfill the upper three (3) feet of trench below the road base course with cement stabilized sand as noted above, or in the case of storm water pipe or box installation the Contractor may backfill and compact select material to 98% Standard Proctor density (ASTM D698)following City Standard Specification Section 022100. 3. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, excavation and backfill for utilities, including select material or cement-stabilized sand backfill,shall not be measured and paid for separately. It shall be considered subsidiary to the items for which the excavation and backfill is required. 022020 Page 4 of 4 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 022021 CONTROL OF GROUND WATER 1. GENERAL 1.1 SECTION INCLUDES A. Dewatering, depressurizing, draining, and maintaining trenches, shaft excavations, structural excavations, and foundation beds in a stable condition, and controlling ground water conditions for tunnel excavations. B. Protection of excavations and trenches from surface runoff. C. Disposing of removed ground water by approved methods. 1.2 REFERENCES A. ASTM D 698 - Test Methods for Moisture-Density Relations of Soils and Soil-Aggregate Mixtures, Using 5.5-1b (2.49 kg) Rammer and 12-inch (304.8 mm) Drop. B. Federal Regulations, 29 CFR Part 1926, Standards-Excavation, Occupational Safety and Health Administration (OSHA). C. Federal Register 40 CFR(Vol. 55, No. 222)Part 122, EPA Administered Permit Programs (NPDES), Para.122.26(b)(14) Storm Water Discharge. 1.3 DEFINITIONS A. Ground water control includes both dewatering and depressurization of water-bearing soil layers. 1. Dewatering includes lowering the water table and intercepting seepage which would otherwise emerge from slopes or bottoms of excavations, or into tunnels and shafts, and disposing of removed ground water by approved methods. The intent of dewatering is to increase the stability of tunnel excavations and excavated slopes; prevent dislocation of material from slopes or bottoms of excavations; reduce lateral loads on sheeting and bracing; improve excavating and hauling characteristics of excavated material; prevent failure or heaving of the bottom of excavations; and to provide suitable conditions for placement of backfill materials and construction of structures,piping and other installations. 2. Depressurization includes reduction in piezometric pressure within strata not controlled by dewatering alone, as required to prevent failure or heaving of excavation bottom or instability of tunnel excavations. B. Excavation drainage includes keeping excavations free of surface and seepage water. 022021 Page 1 of 10 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 C. Surface drainage includes the use of temporary drainage ditches and dikes and installation of temporary culverts and sump pumps with discharge lines as required to protect the Work from any source of surface water. D. Equipment and instrumentation for monitoring and control of the ground water control system includes piezometers and monitoring wells, and devices, such as flow meters, for observing and recording flow rates. 1.4 PERFORMANCE REQUIREMENTS A. Conduct subsurface investigations as needed to identify ground water conditions and to provide parameters for design, installation, and operation of ground water control systems. B. Design a ground water control system, compatible with requirements of Federal Regulations 29 CFR Part 1926 and City Standard Specification Section 022022 - Trench Safety for Excavations, to produce the following results: 1. Effectively reduce the hydrostatic pressure affecting: a) Excavations (including utility trenches); b) Tunnel excavation, face stability or seepage into tunnels. 2. Develop a substantially dry and stable subgrade for subsequent construction operations. 3. Preclude damage to adjacent properties, buildings, structures, utilities, installed facilities, and other work. 4. Prevent the loss of fines, seepage, boils, quick condition, or softening of the foundation strata. 5. Maintain stability of sides and bottom of excavations. C. Provide ground water control systems which may include single-stage or multiple-stage well point systems, eductor and ejector-type systems, deep wells, or combinations of these equipment types. D. Provide drainage of seepage water and surface water, as well as water from any other source entering the excavation. Excavation drainage may include placement of drainage materials, such as crushed stone and filter fabric, together with sump pumping. E. Provide ditches, berms,pumps and other methods necessary to divert and drain surface water away from excavations. F. Locate ground water control and drainage systems so as not to interfere with utilities, construction operations, adjacent properties, or adjacent water wells. 022021 Page 2 of 10 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 G. Assume sole responsibility for ground water control systems and for any loss or damage resulting from partial or complete failure of protective measures, and any settlement or resultant damage caused by the ground water control operations. Modify ground water control systems or operations if they cause or threaten to cause damage to new construction, existing site improvements, adjacent property, or adjacent water wells, or affect potentially contaminated areas. Repair damage caused by ground water control systems or resulting from failure of the system to protect property as required. H. Provide an adequate number of piezometers installed at the proper locations and depths as required to provide meaningful observations of the conditions affecting the excavation, adjacent structures, and water wells. I. Provide environmental monitoring wells installed at the proper locations and depths as required to provide adequate observations of hydrostatic conditions and possible contaminant transport from contamination sources into the work area or into the ground water control system. J. Decommission piezometers and monitoring wells installed during design phase studies and left for Contractors monitoring and use, if applicable. 1.5 ENVIRONMENTAL REQUIREMENTS A. Comply with requirements of agencies having jurisdiction. B. Comply with Texas Commission on Environmental Quality (TCEQ)regulations and Texas Water Well Drillers Association for development, drilling, and abandonment of wells used in dewatering system. C. Prior to beginning construction activities, file Notice of Intent(NOI) for Storm Water Discharges Associated with Construction Activity under the Texas Pollutant Elimination System (TPDES) General Permit No. TXR150000, administered by the Texas Commission on Environmental Quality (TCEQ). The general permit falls under the provisions of Section 402 of the Clean Water Act and Chapter 26 of the Texas Water Code. D. Prepare submittal form and submit to TCEQ along with application fee. E. Upon completion of construction, rile Notice of Termination (NOT) for Storm Water Discharges Associated with Construction Activity under the TPDES General Permit with the TCEQ. F. Obtain all necessary permits from agencies with control over the use of ground water and matters affecting well installation, water discharge, and use of existing storm drains and natural water sources. Because the review and permitting process may be lengthy, take early action to pursue and submit for the required approvals. G. Monitor ground water discharge for contamination while performing pumping in the vicinity of potentially contaminated sites. 022021 Page 3 of 10 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 H. Conduct sampling and testing of ground water and receiving waters as outlined in Article 3 below. 2. PRODUCTS 2.1 EQUIPMENT AND MATERIALS A. Equipment and materials are at the option of Contractor as necessary to achieve desired results for dewatering. B. Eductors, well points, or deep wells, where used, shall be furnished, installed and operated by an experienced contractor regularly engaged in ground water control system design, installation, and operation. C. All equipment must be in good repair and operating order. D. Sufficient standby equipment and materials shall be kept available to ensure continuous operation, where required. 3. EXECUTION 3.1 GROUND WATER CONTROL A. Perform a subsurface investigation by borings as necessary to identify water bearing layers, piezometric pressures, and soil parameters for design and installation of ground water control systems. Perform pump tests, if necessary to determine the drawdown characteristics of the water bearing layers. B. Provide labor, material, equipment, techniques and methods to lower, control and handle ground water in a manner compatible with construction methods and site conditions. Monitor effectiveness of the installed system and its effect on adjacent property. C. Install, operate, and maintain ground water control systems in accordance with the ground water control system design. Notify the City's Construction Inspector in writing of any changes made to accommodate field conditions and changes to the Work. Revise the ground water control system design to reflect field changes. D. Provide for continuous system operation, including nights, weekends, and holidays. Arrange for appropriate backup if electrical power is primary energy source for dewatering system. E. Monitor operations to verify that the system lowers ground water piezometric levels at a rate required to maintain a dry excavation resulting in a stable subgrade for prosecution of subsequent operations. F. Where hydrostatic pressures in confined water bearing layers exist below excavation, depressurize those zones to eliminate risk of uplift or other instability of excavation or installed 022021 Page 4 of 10 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 works. Allowable piezometric elevations shall be defined in the ground water control system design. G. Remove ground water control installations. 1. Remove pumping system components and piping when ground water control is no longer required. 2. Remove piezometers and monitoring wells when directed by the City Engineer. 3. Grout abandoned well and piezometer holes. Fill piping that is not removed with cement- bentonite grout or cement-sand grout. H. During backfilling, dewatering may be reduced to maintain water level a minimum of 5 feet below prevailing level of backfill. However, do not allow that water level to result in uplift pressures in excess of 80 percent of downward pressure produced by weight of structure or backfill in place. Do not allow water levels to rise into cement stabilized sand until at least 48 hour after placement. I. Provide a uniform diameter for each pipe drain run constructed for dewatering. Remove pipe drain when it has served its purpose. If removal of pipe is impractical,provide grout connections at 50-foot intervals and rill pipe with cement-bentonite grout or cement-sand grout when pipe is removed from service. J. Extent of construction ground water control for structures with a permanent perforated underground drainage system may be reduced, such as for units designed to withstand hydrostatic uplift pressure. Provide a means for draining the affected portion of underground system, including standby equipment. Maintain drainage system during operations and remove it when no longer required. K. Remove system upon completion of construction or when dewatering and control of surface or ground water is no longer required. L. In unpaved areas, compact backfill to not less than 95 percent of Standard Proctor maximum dry density in accordance with ASTM D 698. In paved areas (or areas to receive paving), compact backfill to not less than 98 percent of Standard Proctor maximum dry density in accordance with ASTM D 698. 3.2 REQUIREMENTS FOR EDUCTOR, WELL POINTS, OR DEEP WELLS A. For above ground piping in ground water control system, include a 12-inch minimum length of clear, transparent piping between every eductor well or well point and discharge header so that discharge from each installation can be visually monitored. B. Install sufficient piezometers or monitoring wells to show that all trench or shaft excavations in water bearing materials are pre-drained prior to excavation. Provide separate piezometers for 022021 Page 5 of 10 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 monitoring of dewatering and for monitoring of depressurization. Install piezometers and monitoring wells for tunneling as appropriate for Contractor's selected method of work. C. Install piezometers or monitoring wells not less than one week in advance of beginning the associated excavation (including trenching). D. Dewatering may be omitted for portions of underdrains or other excavations, but only where auger borings and piezometers or monitoring wells show that soil is pre-drained by an existing system such that the criteria of the ground water control system design are satisfied. E. Replace installations that produce noticeable amounts of sediments after development. F. Provide additional ground water control installations, or change the methods, in the event that the installations according to the ground water control system design do not provide satisfactory results based on the performance criteria defined by the ground water control system design and by these specifications. 3.3 EXCAVATION DRAINAGE A. Contractor may use excavation drainage methods if necessary to achieve well drained conditions. The excavation drainage may consist of a layer of crushed stone and filter fabric, and sump pumping in combination with sufficient wells for ground water control to maintain stable excavation and backfill conditions. 3.4 MAINTENANCE AND OBSERVATION A. Conduct daily maintenance and observation of piezometers or monitoring wells while the ground water control installations or excavation drainage are operating in an area or seepage into tunnel is occurring. Keep system in good condition. B. Replace damaged and destroyed piezometers or monitoring wells with new piezometers or wells as necessary to meet observation schedule. C. Cut off piezometers or monitoring wells in excavation areas where piping is exposed, only as necessary to perform observation as excavation proceeds. Continue to maintain and make observations, as specified. D. Remove and grout piezometers inside or outside the excavation area when ground water control operations are complete. Remove and grout monitoring wells when directed by the City Engineer. 3.5 MONITORING AND RECORDING A. Monitor and record average flow rate of operation for each deep well, or for each wellpoint or eductor header used in dewatering system. Also monitor and record water level and ground water recovery. These records shall be obtained daily until steady conditions are achieved, and twice weekly thereafter. 022021 Page 6 of 10 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 B. Observe and record elevation of water level daily as long as ground water control system is in operation, and weekly thereafter until the Work is completed or piezometers or wells are removed, except when City Engineer determines that more frequent monitoring and recording are required. Comply with Construction Inspector's direction for increased monitoring and recording and take measures as necessary to ensure effective dewatering for intended purpose. 3.6 SAMPLING, TESTING AND DISPOSAL OF GROUND WATER A. It is the intent that the Contractor discharge groundwater primarily into the existing storm water system in accordance with City Ordinance, Article XVI, Section 55-203, only if the groundwater is uncontaminated and the quality of the ground water is equal to or better than the quality of the receiving stream. B. The Contractor shall prevent ground water from trench or excavation dewatering operations from discharging directly into the storm water system prior to testing and authorization. Ground water from dewatering operations shall be sampled and tested, and disposed of by approved methods. C. Laboratory analysis of groundwater and receiving water quality is to be performed by the Contractor at the Contractor's expense, prior to commencing discharge, and groundwater analysis shall be performed by the Contractor at a minimum of once per week. Contractor shall coordinate with the City Storm Water Department on all laboratory analysis. Laboratory analysis of groundwater shall also be performed at each new area of construction prior to discharge from that location. D. Sample containers, holding times,preservation methods, and analytical methods, shall either follow the requirements in 40 CFR Part 136 (as amended), or the latest edition of"Standard Methods for the Examination of Water and Wastewater." Any laboratory providing analysis must be accredited or certified by the Texas Commission on Environmental Quality according to Title 30 Texas Administrative Code (30 TAC) Chapters 25 for the matrices, methods, and parameters of analysis, if available, or be exempt according to 30 TAC §25.6. E. Analysis of the ground water discharge shall show it to be equal to or better than the quality of the first natural body of receiving water. This requires testing of both the receiving water and a sample of the ground water. All parts of this procedure shall be complete prior to any discharge of ground water to the storm water system. F. Steps to Determine Legitimate Discharge: 1. Identify the First Receiving Water. a) When the first body of water is a fresh water system (Nueces River or Oso Creek), the analysis typically fails because the local ground water will likely be too high in Total Dissolved Solids (TDS). In the case of a perched aquifer, the ground water may turn out fairly fresh, but local experience shows this to be unlikely. b) If the receiving water is a marine environment,proceed with Step 2 below to compare the ground water quality to receiving water quality. 022021 Page 7 of 10 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 2. Compare Ground Water Discharge Quality to Receiving Water Quality. The following table, Ground Water Discharge Limits, indicates that the parameters to compare to the receiving water are Total Dissolved Solids (TDS) and Total Suspended Solids (TSS). If the ground water results are equal to or better than the receiving water, then the discharge may be authorized as long as the discharge does not exceed the other parameters which would indicate hydrocarbon contamination. Note that the receiving water only needs to be tested initially as a baseline and the ground water shall be tested weekly to ensure compliance. GROUND WATER DISCHARGE LIMITS Ground Receiving Water Water Monitoring Monitoring Maximum Parameter Frequency Frequency Limitation Total Dissolved Once Prior to Solids(TDS) Initial +Weekly Discharge <Receiving Water Total Suspended Once Prior to Solids(TSS) Initial +Weekly Discharge <Receiving Water Total Petroleum Hydrocarbons Initial +Weekly 15 mg/L Total Lead Initial +Weekly 0.1 mg/L Benzene Initial +Weekly 0.005 mg/L Total BTEX Initial +Weekly 0.1 mg/L Polynuclear Aromatic Hydrocarbons Initial +Monthly 0.01 mg/L 3. Analyze Ground Water for Hydrocarbon Contamination. All other parameters listed on the Ground Water Discharge Limits table must be analyzed prior to ground water discharge to the storm water system. If no limits are exceeded, ground water discharge to the storm water system may be authorized following notification to the MS4 operator(City of Corpus Christi) and all Pollution Prevention Measures for the project are in place. Analytical results shall be on-site or readily available for review by local, state or federal inspectors. Note that this step is frequently done simultaneously with Step 2 above to shorten analytical processing time. 4. Pollution Prevention Measures. A storm water pollution prevention plan or pollution control plan shall be developed and implemented prior to any ground water discharges to the storm water system. The plan's objectives are to limit erosion and scour of the storm water system, and minimize Total Suspended Solids (TSS) and other forms of contamination, and prevent any damage to the storm water system. Note that ground water discharges must cease immediately upon the first recognition of contamination, either by sensory or analytical methods. If the discharge of groundwater results in any damages to the storm water system, the responsible party 022021 Page 8 of 10 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 shall remediate any damage to the storm water system and the environment to the satisfaction of the Storm Water Department and/or any State or Federal Regulatory Agency. 5. MS4 Operator Notification. The MS4 operator shall be notified prior to ground water discharge to the storm water system. Contractor shall contact the designated City MS4 representative to request authorization to discharge ground water to the storm water system. Notification shall include: Project Name: Responsible Party: Discharge Location: Receiving Water: Estimated Time of Discharge: Linear Project: Yes/No Pollution Prevention Measures Implemented: Statement indicating all sampling and testing has been conducted and meets the requirements of a legitimate discharge. G. Discharges to Wastewater System In the event that the groundwater does not equal or exceed the receiving water quality, an alternative disposal option would include pumping to the nearest sanitary sewer system. Discharge to the sanitary sewer system requires a permit from the Wastewater Department. If discharging to temporary holding tanks and trucking to a sanitary sewer or wastewater treatment plant, the costs for these operations shall be negotiated. Contractor shall contact the Pretreatment Group for City Utility Operations to obtain a Wastewater Discharge Permit Application for authorization to discharge to the wastewater system. Authorization approval will include review of laboratory analysis of the ground water and estimated flow data. Note that groundwater discharges must cease immediately upon the first recognition of contamination, either by sensory or analytical methods. If the discharge of groundwater results in any damages to the wastewater collection system or wastewater overflows, the responsible parry shall remediate any damage to the wastewater collection system and the environment to the satisfaction of the Wastewater Department and/or any State or Federal Regulatory Agency. H. Other groundwater disposal alternatives or solutions may be approved by the Engineer on a case by case basis. 3.7 SURFACE WATER CONTROL A. Intercept surface water and divert it away from excavations through the use of dikes, ditches, curb walls,pipes, sumps or other approved means. B. Divert surface water into sumps and pump into drainage channels or storm drains, when 022021 Page 9 of 10 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 approved by the City Engineer. Provide settling basins when required by the City Engineer. C. Storm water that enters the excavation can be pumped out as long as care is taken to minimize solids and mud entering the pump suction and flow is pumped to a location that allows for sheet flow prior to entering a storm water drainage ditch or storm water inlet. An alternative to sheet flow is to pump storm water to an area where ponding occurs naturally without leaving the designated work area or by manmade berm(s)prior to entering the storm water system. Sheet flow and ponding is required to allow solids screening and/or settling prior to entering the storm water system. Storm water or groundwater shall not be discharged to private property. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, control of ground water will not be measured and paid for separately, but shall be considered subsidiary to other bid items. 022021 Page 10 of 10 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 022022 TRENCH SAFETY FOR EXCAVATIONS 1. DESCRIPTION This specification shall govern all work for providing for worker safety in excavations and trenching operations required to complete the project. 2. REQUIREMENTS Worker Safety in excavations and trenches shall be provided by the Contractor in accordance with Occupational Safety and Health Administration (OSHA) Standards, 29 CFR Part 1926 Subpart P - Excavations. It is the sole responsibility of the Contractor, and not the City or Engineer or Consultant, to determine and monitor the specific applicability of a safety system to the field conditions to be encountered on the job site during the project. The Contractor shall indemnify and hold harmless the City and Engineer and Consultant from all damages and costs that may result from failure of methods or equipment used by the Contractor to provide for worker safety. Trenches, as used herein, shall apply to any excavation into which structures, utilities, or sewers are placed regardless of depth. Trench Safety Plan, as used herein, shall apply to all methods and materials used to provide for worker safety in excavation and trenching operations required during the project. 3. MEASUREMENT AND PAYMENT Measurement of Trench Safety shall be by the linear foot of trench, regardless of depth. Measurement shall be taken along the centerline of the trench. Measurement for Excavation Safety for Utility Structures shall be per each excavation. Excavations include, but are not limited to, those for manholes, vaults, pits and other such structures that are incidental to utility work. Measurement for Excavation Safety for Special Structures shall be per each excavation or by the lump sum for each special structure identified in the Proposal. Payment shall be at the unit price bid and shall fully compensate the Contractor for all work, equipment, materials, personnel, and incidentals as required to provide for worker safety in trenches and excavations for the project. Revision current for Texas Code Chapter 756 Subchapter C.Trench Safety. 022022 Page 1 of 1 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 022040 STREET EXCAVATION 1. DESCRIPTION This specification shall govern all work for Street Excavation required to complete the project. 2. CONSTRUCTION METHODS (A) Stripping and Excavation Strip the top 6 inches in all areas to underlay compacted fill, curbs, base or pavement, by removing all humus, vegetation and other unsuitable materials. Unless otherwise noted, remove existing trees, shrubs, fences, curb, gutter, sidewalk, drives, paving, pipe and structures and other items within the graded area which interfere with new construction of finished grading. All suitable excavated materials shall be utilized, insofar as practicable, in constructing the required roadway sections or in uniformly widening embankments, flattening slopes, etc., as directed by the Engineer, provided that the material meets the requirements for roadway embankment as specified in Article 3 below. Unwanted or unsuitable roadway excavation and roadway excavation in excess of that needed for construction shall become the property of the Contractor to be disposed of by him outside the limits of the right-of-way at a location suitable to the Engineer. "Unsuitable" material encountered below subgrade elevation in roadway cuts, when declared unwanted by the Engineer, shall be replaced as directed by the Engineer with suitable material from the roadway excavation or with other suitable material. Maintain moisture and density until covered and protected by the subbase or base course. Remove soft or wet areas found at any time,replace with suitable material, and recompact(especially utility trenches). (B) Subgrade Preparation That area shown on the drawings for street construction shall be cut to grade, scarified to a depth not less than 6 inches, or as otherwise indicated on the drawings, and compacted to 95% Standard Proctor density (ASTM D698) to within 0 to +3% of optimum moisture. The section may be accepted if no more than 1 in 5 of the most recent moisture or density tests is beyond ±1% deviation from the required moisture or density requirement. Irregularities exceeding 1/2 inch in 16 feet shall be corrected. Soft areas found at anytime shall be removed, replaced with suitable material and compacted (especially at utility trenches). The correct moisture density relationship shall be maintained until the subgrade is protected. Excessive loss of moisture shall be prevented by sprinkling, sealing, or covering with a subsequent layer. Should the subgrade, due to any reason or cause, lose the required stability, density, or moisture before it is protected by placement of the next layer, it shall be re-compacted and refinished and retested at the expense of the Contractor until acceptable to the City. 022040 Page 1 of 3 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 (C) Curb Backfill and Topsoil(Sidewalks, Parkways,Islands, etc.) Fill and compact areas behind curbs and adjacent to sidewalks and driveways within 48 hours after completion of concrete work. The top 6 inches (where disturbed by construction or where unsatisfactory material is exposed by excavation) of finish earth grade shall be clean excavated material or topsoil capable of supporting a good growth of grass when fertilized and seeded or sodded. It shall be free of concrete, asphalt, shell, caliche, debris and any other material that detracts from its appearance or hampers the growth of grass. Topsoil shall meet the requirements specified in City Standard Specification Section 028020 "Seeding". (D) Matching Grades at Right-of-Waw Finish grade at the property line shall be as shown on the drawings. The Engineer may require a reasonable amount of filling on private property where the sidewalk grade is above the property elevation. Use suitable material from the excavation. Unless otherwise directed, cuts at right-of- way lines shall be made at a slope of three horizontal to one vertical (3:1) or flatter. (E) Drainage During construction, the roadbed and ditches shall be maintained in such condition as to insure proper drainage at all times, and ditches and channels shall be so constructed and maintained as to avoid damage to the roadway section. All slopes which, in the judgment of the Engineer, require variation, shall be accurately shaped, and care shall be taken that no material is loosened below the required slopes. All breakage and slides shall be removed and disposed of as directed. 3. SELECTION OF ROADBED MATERIALS Where shown on the plans, Select Material shall be utilized to improve the roadbed, in which case the work shall be performed in such manner and sequence that suitable materials may be selected, removed separately, and deposited in the roadway within limits and at elevations required. Material used for roadway embankment shall meet the requirements of City Standard Specification Section 022100 Select Material. 4. GEOGRID If indicated on the drawings, geogrid shall be placed in the base layer according to the pavement details to provide a mechanically-stabilized aggregate base layer within the pavement structure. Geogrid shall be "Tensar TX5 Triaxial Geogrid", or pre-approved equivalent. Use (and approval) of a different product must be supported by documentation showing that the alternate pavement section will meet or exceed the required number of 18-kip equivalent single axle loads (ESAL) and structural number (SN) over the stated pavement design life, and the pavement design must be sealed and signed by a Texas professional engineer. Documentation must also include the structural design value used for the geogrid structural contribution, based on and supported by 022040 Page 2 of 3 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 validated test data. Alternate pavement designs shall utilize the same structural design values for other pavement structural components (HMAC, base, sub-base) as used in the original pavement design, and the pavement designs must be approved by the Engineer and the geotechnical consultant. Contractor shall take care to protect geogrid from damage. Overlap edges of geogrid in accordance with the manufacturer's recommendations, but not less than 12 inches. Do not drive tracked equipment directly on the geogrid. Provide at least 6 inches of compacted aggregate base material over the geogrid before driving any tracked equipment over the geogrid area. Standard highway- legal rubber-tired trucks may drive over the geogrid at very slow speeds (less than 5 mph). Avoid turns and sudden starts and stops when driving on the geogrid. Any damaged geogrid shall be replaced by the Contractor at no additional cost to the City. Proper replacement shall consist of replacing the affected area adding 3 feet of geogrid in each direction beyond the limits of the affected area. 5. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, street excavation shall be measured and paid for by the square yard to the limits shown on the drawings including excavation for street transitions. Payment shall be full compensation for furnishing all labor, materials, tools, equipment, borrow material and incidentals necessary to complete the work. Unless otherwise specified on the Bid Form, compacted subgrade shall be measured and paid for by the square yard to the limits shown on the drawings. Payment shall be full compensation for furnishing all labor, materials, tools, equipment, borrow material and incidentals necessary to complete the work. Unless otherwise specified on the Bid Form, geogrid shall be measured and paid for by the square yard to the limits shown on the drawings, excluding overlaps. Payment shall be full compensation for furnishing all labor, materials, tools, equipment, and incidentals necessary to complete the work. All work required for disposing of waste, including hauling will not be paid for directly but shall be considered subsidiary to the various contract items. 022040 Page 3 of 3 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 022060 CHANNEL EXCAVATION 1. DESCRIPTION This specification shall govern all work for Channel Excavation required to complete the project. 2. CONSTRUCTION METHODS Trees, stumps, brush and other vegetation shall be removed and hauled away. Excavated slopes shall be finished in conformance with the lines and grades established by the Engineer. When completed, the average plane of slopes shall conform to the slopes indicated on the drawings, and no point on completed slopes shall vary from the designated slopes by more than 0.5 foot measured at right angles to the slope. In no case shall any portion of the slope encroach on the roadbed. The tops of excavated slopes and the end of excavation shall be rounded. The bottom and sides of the ditch or channel shall be undercut a minimum depth sufficient to accommodate topsoil for seeding, sodding, or slope protection, as indicated on the drawings. All suitable materials removed from the excavation shall be used, insofar as practicable, in the formation of embankments in accordance with City Standard Specification Section 022080 "Embankment", or shall be otherwise utilized or satisfactorily disposed of as indicated on drawings, or as directed, and the completed work shall conform to the established alignment, grades and cross sections. During construction, the channel shall be kept drained, insofar as practicable, and the work shall be prosecuted in a neat workmanlike manner. Unsuitable channel excavation in excess of that needed for construction shall become the property of the Contractor and removed from the site and properly disposed of. 3. SELECTION OF MATERIALS Where shown on the drawings, selected materials shall be utilized in the formation of embankment or to improve the roadbed, provided that the material meets the requirements specified in City Standard Specification Sections 022040 "Street Excavation" and 022100 "Select Material", in which case the work shall be performed in such manner and sequence that suitable materials may be selected, removed separately and deposited in the roadway within the limits and at elevations required. Concrete for lining channels, where specified on the drawings, shall be Class "A" in accordance with City Standard Specification Section 030020 "Portland Cement Concrete". 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, channel excavation shall be measured in its original position and the volume computed in cubic yards by the method of average end areas, or by linear foot of channel or drainage ditch, as specified. Channel excavation shall include,but not be limited to, clearing and removal of vegetation, excavation, de-watering, embankment, compaction, hauling, and disposal. Channel excavation shall not include undercutting to accommodate topsoil, sod, or slope protection. Payment shall be at the bid price for the unit of measurement specified and shall be full compensation for furnishing all labor, materials, tools, equipment and incidentals necessary to complete the work. 022060 Page 1 of 1 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 022080 EMBANKMENT 1. DESCRIPTION This specification shall govern all work for Embankment required to complete the project. 2. CONSTRUCTION METHODS Prior to placing embankment, the area to be covered shall be stripped of all vegetation and the material so removed shall be disposed of off the job site. Washes, gulleys, wet areas, and yielding areas shall be corrected as directed by the Engineer. Unless otherwise indicated on the drawings, the surface of the ground which is to receive embankment shall be loosened by scarifying or plowing to a depth of not less than 6 inches. The loosened material shall be recompacted with the new embankment as hereinafter specified. Embankment shall be placed in layers not to exceed ten (10) inches uncompacted (loose) depth for the full width of the embankment,unless otherwise noted. Where embankment is adjacent to a hillside or old roadbed, the existing slope shall be cut in steps to not less than the vertical depth of an uncompacted layer. The fill material shall be placed from the low side and compacted. Each layer shall overlap the existing embankment by at least the width indicated by the embankment slope. Trees, stumps, roots, vegetation, debris or other unsuitable materials shall not be placed in embankment. Each layer of embankment shall be uniform as to material, density and moisture content before beginning compaction. Where layers of unlike materials abut each other, each layer shall be feather-edged for at least 100 feet or the material shall be so mixed as to prevent abrupt changes in the soil. No material placed in the embankment by dumping in a pile or windrow shall be incorporated in a layer in that position, but all such piles or windrows shall be moved by blading or similar methods. Clods or lumps of material shall be broken and the embankment material mixed by blading, harrowing, disking or similar methods to the end that a uniform material of uniform density is secured in each layer. Except as otherwise required by the drawings, all embankments shall be constructed in layers approximately parallel to the finished grade and each layer shall be so constructed as to provide a uniform slope of 1/4 inch per foot from the centerline of the embankment to the outside. Each layer shall be compacted to the required density and moisture by any method, type and size of equipment that will give the required compaction. Prior to and in conjunction with the rolling operation, each layer shall be brought to the moisture content necessary to obtain the required density and shall be kept leveled with suitable equipment to insure uniform compaction over the entire layer. For each layer of earth embankment and select material, it is the intent of this specification to provide the density as required herein, unless otherwise shown on the drawings. Soils for 022080 Page 1 of 2 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 embankment shall be sprinkled with water as required to provide not less than optimum moisture and compacted to the extent necessary to provide not less than 95% Standard Proctor density (ASTM D698). Field density determinations will be made in accordance with approved methods. After each layer of earth embankment or select material is complete, tests, as necessary, will be made by the Engineer. If the material fails to meet the density specified, the course shall be reworked as necessary to obtain the specified compaction, and the compaction method shall be altered on subsequent work to obtain specified density. Such procedure shall be determined by, and subject to,the approval of the Engineer. The Engineer may order proof rolling to test the uniformity of compaction of the embankment layers. All irregularities, depressions, weak or soft spots which develop shall be corrected immediately by the Contractor. Should the embankment, due to any reason or cause, lose the required stability, density or moisture before the pavement structure is placed, it shall be recompacted and refinished at the sole expense of the Contractor. Excessive loss of moisture in the subgrade shall be prevented by sprinkling, sealing or covering with a subsequent layer of granular material. 3. SELECTION OF MATERIAL In addition to the requirement in the excavation items of the specifications covering the general selection and utilization of materials to improve the roadbed, embankments shall be constructed in proper sequence to receive the select material layers shown on drawings, with such modifications as may be directed by the Engineer. The layer of embankment immediately preceding the upper layer of select material shall be constructed to the proper section and grade within a tolerance of not more than 0.10 foot from the established section and grade when properly compacted and finished to receive the select material layer. Select material, when specified, shall meet the requirements in City Standard Specification Section 022100 "Select Material". 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, embankment shall not be measured and paid for separately,but shall be subsidiary to other items of work. 022080 Page 2 of 2 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 022100 SELECT MATERIAL 1. DESCRIPTION This specification shall govern the use of Select Material to be used to treat designated sections of roadways, embankments, trenches, etc. Select material shall be non-expansive sandy clay (CL) or clayey sand (SC), in accordance with the Unified Soil Classification System (ASTM D2487). Select Material shall meet the following requirements: Free of vegetation,hard lumps, rock fragments, or other debris No clay lumps greater than 2"diameter Liquid Limit(L.L.): <35 Plasticity Index (P.I.)Range: 8 to 20 Moisture Content: as specified in the drawings 2. CONSTRUCTION METHODS Select material shall be mixed uniformly and placed in layers as indicated, not to exceed 10 inches loose depth (or 12 inches maximum for sanitary sewer trench backfill per City Standard Details for Sanitary Sewers). Unless otherwise specified, the material shall be compacted to a minimum of 95% Standard Proctor density. Each layer shall be complete before the succeeding layer is placed. The finished surface of the select material shall conform to the grade and section shown on the drawings. 3. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, select material shall not be measured for pay, but shall be subsidiary to the appropriate bid item. 022100 Page 1 of 1 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 022420 SILT FENCE 1. DESCRIPTION This specification shall govern all work necessary for providing and installing silt fencing required to control sedimentation and erosion during construction of the project. 2. MATERIAL REQUIREMENTS A. Geotextile shall meet the requirements for temporary silt fence per AASHTO M288. B. Fence Reinforcement Materials: Silt fence reinforcement shall be one of the following systems. Type 1: Self-Supported Fence - This system consists of fence posts, spaced no more than 8- 1/2 feet apart, and geotextile without net reinforcement. Fence posts shall be a minimum of 42 inches long, embedded at least one (1) foot into the ground, and constructed of either wood or steel. Soft wood posts shall be at least 3 inches in diameter or nominal 2 x 4 inches in cross section and essentially straight. Hardwood posts shall be a minimum of 1.5 x 1.5 inches in cross section. Fabric attachment may be by staples or locking plastic ties at least every 6 inches, or by sewn vertical pockets. Steel posts shall be T or L shaped with a minimum weight of 1.3 pounds per foot. Attachment shall be by pockets or by plastic ties if the posts have suitable projections. Type 2: Net-Reinforced Fence - This system consists of fence posts, spaced no more than 8-1/2 feet apart, and geotextile with an attached reinforcing net. Fence posts shall meet the requirements of Self-Supported Fence. Net reinforcement shall be galvanized welded wire mesh of at least 12.5-gauge wire with maximum opening size of 4 x 2 inches. The fabric shall be attached to the top of the net by crimping or cord at least every 2 feet, or as otherwise specified. Type 3: Triangular Filter Dike - This system consists of a rigid wire mesh, at least 6-gauge, formed into an equilateral triangle cross-sectional shape with sides measuring 18 inches, wrapped with geotextile silt fence fabric. The fabric shall be continuously wrapped around the dike,with a skirt extending at least 12 inches from its upslope corner. C. Packaging Requirements: Prior to installation, the fabric shall be protected from damage due to ultraviolet light and moisture by either wrappers or inside storage. 022420 Page 1 of 2 Rev.1030-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 D. Certification and Identification: Each lot or shipment shall be accompanied by a certification of conformance to this specification. The shipment must be identified by a ticket or by labels securely affixed to the fabric rolls. This ticket or label must list the following information: a. Name of manufacturer or supplier b. Brand name and style C. Manufacturer's lot number or control number d. Roll size(length and width) e. Chemical composition 3. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, silt fence shall be measured by the linear foot. Payment shall be at the bid price for the unit of measurement specified and shall be full compensation for furnishing all labor, materials, tools, equipment and incidentals necessary to complete the work. Payment shall include, but not be limited to, placing, maintaining and removing the silt fence. 022420 Page 2 of 2 Rev.1030-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 025202 SCARIFYING AND RESHAPING BASE COURSE 1. DESCRIPTION "Scarifying and Reshaping Base Course" shall consist of scarifying and reshaping the existing base course (with or without asphalt surface)to the line, grade and section as indicated on the drawings. 2. CONSTRUCTION METHODS The existing base and surface shall be scarified to the width and depth indicated on the drawings. Subgrade shall remain undisturbed, unless indicated otherwise on the drawings. Any asphalt surfacing shall be broken into particles no larger than 2 �/2 inches. The asphalt surfacing shall then be uniformly mixed with the existing base. Additional base material,where required to achieve the lines and grades shown on the drawings, shall also be added to and uniformly mixed with the existing scarified base material. If indicated on the drawings, geogrid shall be installed in the pavement section. The base material shall be shaped and rolled after mixing and allowed to set at least 48 hours before final compaction. Moisture content shall be maintained in the material during the 48-hour period. Material shall be sprinkled with water or aerated to optimum moisture content, and compacted in layers (10-inch maximum loose depth) to a minimum density of 98% Modified Proctor density (AASHTO T180), at a moisture content on the wet side of optimum (+3% maximum). Use mechanical tamps in areas inaccessible to rollers. Upon completion of compaction, the surface shall be smooth and shall conform to line, grade and section as shown on the drawings. Areas with any deviation in excess of 1/4 inch in cross-section, and in lengths of 16 feet measured longitudinally, shall be corrected by loosening, adding or removing material, reshaping, and re-compacting by sprinkling and rolling. Moisture content shall be maintained on the wet side of optimum (+3% maximum)until paving is complete. If required, lime shall be applied in the amount indicated on the drawings. Lime shall be applied and the treated base mixed, cured, compacted and finished in accordance with City Standard Specification Section 025210 "Lime Stabilization." 3. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, scarifying and reshaping base course shall not be measured and paid for separately,but shall be subsidiary to other work. 025202 Page 1 of 1 Rev.10,30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 025205 PAVEMENT REPAIR, CURB, GUTTER, SIDEWALK AND DRIVEWAY REPLACEMENT 1. DESCRIPTION This specification shall govern the removal and replacing of all types of pavements and surfacing required to complete the project. 2. MATERIALS Unless otherwise specified on the drawings, materials and proportions used along with this specification shall conform to the respective following specifications: City Standard Specifications Section 022020 "Excavation and Backfill for Utilities" Section 022100 "Select Material" Section 025223 "Crushed Limestone Flexible Base" Section 025424 "Hot Mix Asphaltic Concrete Pavement" Section 025610 "Concrete Curb and Gutter" Section 025612 "Concrete Sidewalks and Driveways" Section 025620 "Portland Cement Concrete Pavement" Section 030020 "Portland Cement Concrete", Class "A" Concrete Section 032020 "Reinforcing Steel" Section 038000 "Concrete Structures". 3. METHOD OF CUTTING The outline of the trench shall be marked upon the surface of the pavement to be cut,and all cuts into the pavement shall be saw-cut as nearly vertical as it is possible to make them. All unwanted materials removed shall be disposed of by the Contractor and shall not be used as backfill material. 4. BACKFILL OF TRENCH Excavation and backfilling of trench shall be in accordance with City Standard Specification Section 022020 "Excavation and Backfill for Utilities." 025205 Page 1 of 4 Rev.11-9-2016 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 5. REPLACING STREET AND OTHER PAVEMENT All pavements, driveways, sidewalks, and curbs and gutters which are cut shall be replaced in a workmanlike manner,with like or better materials or per pavement repair details to be provided on the drawings. Pavement cuts in a street for any utility requires a permit from the Director of Development Services in accordance with City Ordinance 030040, Article III Cuts and Excavations (12-17-2013). The installation of a utility that crosses the ROW at a perpendicular or near perpendicular angle and has an OD of 6" or less will not be permitted to be installed by cutting the road section. Street excavation/cut for a utility in an asphalt roadway shall include a full lane overlay or pavement repair for parallel cuts, or a 12' wide pavement repair for perpendicular cuts. Street excavation/cut for a utility in a concrete roadway shall include full panel replacement. The drawings and/or permit application should include a site specific pavement cut and restoration plan that indicates the general nature of the pavement and roadway (for examples, concrete arterial, asphalt residential)to be cut and restored, the existing pavement section (if known), the location and approximate area of the excavation/pavement repair, including the approximate length and width of the pavement repair in relation to the roadway travel lane(s). 6. REPLACING DRIVEWAY PAVEMENT On all concrete driveway pavements,the replacement shall consist of a reinforced Class"A"concrete slab with a minimum thickness of six(6)inches. The type of finish for the replaced section shall be the same as that appearing on the old pavement. Reinforcement shall be 94 bars at 12 inches each way with additional diagonal bars as indicated on the drawings. Any other type shall be replaced with like or better replacement. Replacement shall, in general, be to original joint or score mark. 7. REPLACING SIDEWALKS On all sidewalk pavements,the replacement shall consist of a reinforced Class"A"concrete slab four (4)inches thick. The type of finish for the replaced section shall be the same as that appearing on the old sidewalk. Replacement shall,in general,be to original joint or score marks. Reinforcement shall be 4" x 4" - W2.9 x W2.9 welded wire fabric located at mid-depth in the slab. 8. REPLACING CURB AND GUTTER On all curb and gutter, the replacement shall consist of a section conforming in all details to the original section or to City of Corpus Christi Standard curb and gutter section, if required by the Engineer. Cuts through the curb shall be replaced with Class "A" concrete. Preserve the original steel reinforcing and reinforce all new curbs with three 94 bars. Adjust grades for positive drainage. Replacement shall,in general,be to original joint or score mark. For jointed concrete roadways,the joints in curb or in curb and gutter should match the concrete roadway joints. 025205 Page 2 of 4 Rev.11-9-2016 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 9. REPAIRING STREET SHOULDERS AND UNIMPROVED STREETS On streets or roads without curb and gutter where a shoulder is disturbed,it shall be restored to like or better condition. The shoulder surface shall be rolled to an acceptably stable condition. The requirements of City Ordinance 030040 as stated above apply also to unimproved streets unless a specific variance is granted by the Director of Development Services. 10. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form,pavement repair shall be measured by the square yard of the type of repair specified; curb and gutter replacement shall be measured by the linear foot; and sidewalk and driveway replacement shall each be measured by the square foot. Payment will be made at the unit price bid for the completed work and shall be full compensation for all labor, materials,equipment,tools,and incidentals required to complete the work. No separate measurement or payment will be made for subgrade compaction, sand leveling course, geogrid, ordinary backfill, cement-stabilized sand backfill, flexible base,prime coat, hot-mix asphaltic concrete, etc. 025205 Page 3 of 4 Rev.11-9-2016 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 THIS PAGE INTENTIONALLY LEFT BLANK 025205 Page 4 of 4 Rev.11-9-2016 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 025210 LIME STABILIZATION 1. DESCRIPTION This specification shall consist of treating the subgrade, subbase or base by the pulverizing, addition of lime, mixing and compacting the mixed material to the required density. This specification applies to natural ground, embankment, existing pavement structure or proposed base, and shall be constructed as specified herein and in conformity with the typical sections, lines and grades as shown on the plans or as established by the Engineer. 2. MATERIALS (1) The lime shall be a commercially produced "Hydrated Lime" in accordance with AASHTO M216, or in accordance with TxDOT Specification Item 260. The specifications apply specifically to the normal hydrate of lime made from "high- calcium" type limestone. Hydrated lime for stabilization purposes shall be applied as a slurry. (2) Lime to be used for the treated subgrade, existing subbase, existing base or proposed base is determined by preliminary tests and shall be applied at a rate indicated on the drawings,but no less than 6%. 3. EQUIPMENT The machinery, tools and equipment necessary for proper prosecution of the work shall be on the project and approved by the Engineer prior to the beginning of construction operations. All machinery, tools and equipment used shall be maintained in a satisfactory and workmanlike manner. Hydrated lime shall be stored and handled in closed weatherproof containers until immediately before distribution on the roadbed. If storage bins are used, they shall be completely enclosed. Hydrated lime in bags shall be stored in weatherproof buildings with adequate protection from ground dampness. If lime is furnished in trucks, each truck shall have the weight of lime certified on public scales. If lime is furnished in bags, each bag shall bear the manufacturer's certified weight. Bags varying more than 5 percent from that weight may be rejected and the average weight of bags in any shipment, as shown by weighing 50 bags taken at random, shall not be less than the manufacturer's certified weight. 025210 Page 1 of 4 Rev.9-2-2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 4. CONSTRUCTION METHODS General - It is the primary requirement of this specification to secure a completed course of treated material containing a uniform lime mixture, free from loose or segregated areas, of uniform density and moisture content, well bound for its full depth and with a smooth surface suitable for placing subsequent courses. It shall be the responsibility of the Contractor to regulate the sequence of his work, to use the proper amount of lime, maintain the work and rework the courses as necessary to meet the above requirements. Application - Lime shall be spread only on that area where the first mixing operations can be completed during the same working day. Unless otherwise shown on drawings, lime shall be applied at a rate in pounds of dry-hydrated lime per square yard, in the form of a slurry. Application rate may be varied by the Engineer, if conditions warrant,but no less than 6%must be applied. Certification of lime quantity and quality shall be provided as required to monitor the application. Certification should be in the form of weight tickets which indicate the actual weight of dry hydrated lime, CA(OH)z. The application and mixing of lime with the material shall be accomplished by the method hereinafter described. The lime shall be mixed with water in trucks with approved distributors and applied as a thin water suspension or slurry. Mixing - The mixing procedure shall be as hereinafter described. (a) First Mixing: The material and lime shall be thoroughly mixed by approved road mixers or other approved equipment, and the mixing continued until, in the opinion of the Engineer, a homogeneous, friable mixture of material and lime is obtained, free from all clods or lumps. Materials containing plastic clays or other material which will not readily mix with lime shall be mixed as thoroughly as possible at the time of the lime application, brought to the proper moisture content and left to cure 1 to 4 days as directed by the Engineer. During the curing period,the material shall be kept moist as directed. (b) Final Mixing: After the required curing time, the material shall be uniformly mixed by approved methods. If the soil binder-lime mixture contains clods, they shall be reduced in size by raking, blading, discing, harrowing, scarifying or the use of other approved pulverization methods. After mixing, the Engineer may sample the mixture at roadway moisture and test in accordance with Tex-101-E, Part III, to determine compliance with the gradation requirements in Table 1. 025210 Page 2 of 4 Rev.9-2-2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Table 1 Gradation Re uirements Minimum % Passing) Sieve Size Base Sub rade 1-3/4" 100 100 3/4" 85 85 #4 — 60 Old bituminous wearing surface shall be pulverized so that 100%will pass a 2 /z" sieve. During the interval of time between applications and mixing, hydrated lime that has been exposed to the open air for a period of 6 hours or more, or to excessive loss due to washing or blowing,will not be accepted for payment. Compaction - Compaction of the mixture shall begin immediately after final mixing and in no case later than 3 calendar days after final mixing, unless approval is obtained from the Engineer. The material shall be aerated or sprinkled as necessary to provide the optimum moisture. Compaction shall begin at the bottom and shall continue until the entire depth of mixture is uniformly compacted as hereinafter specified. If the total thickness of the material to be treated cannot be mixed in one operation, the previously mixed material shall be bladed to a windrow just beyond the area to be treated and the next layer mixed with lime as previously specified. The first layer of the material shall be compacted in such a manner that the treated material will not be mixed with the underlying material. The course shall be sprinkled as required to maintain moisture content on the wet side of optimum and compacted to the extent necessary to provide the specified density. Unless shown otherwise on the drawings, all lime treated subgrades, sub-bases, and bases that are not in direct contact with surface or binder course shall be compacted to a minimum of 95% Standard Proctor density (AASHTO T99),unless otherwise specified. In addition to the requirements specified for density, the full depth of the material shown on the plans shall be compacted to the extent necessary to remain firm and stable under construction equipment. After each section is completed, tests, as necessary, will be made by the Engineer. If the material fails to meet the density requirements, it shall be reworked as necessary to meet these requirements. Rework, when required to meet pulverization requirements or density requirements, shall include the addition of lime, about 10% to 15% of the initial application rate, or as deemed necessary by the Engineer. A new optimum density will be obtained. Throughout this entire operation, the shape of the course shall be maintained by blading, and the surface, upon completion, shall be smooth and in conformity with the typical section shown on the drawings and to the established lines and grades. 025210 Page 3 of 4 Rev.9-2-2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 5. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, lime stabilization for bases, sub-bases and subgrade shall be measured by the square yard of lime-stabilized material in place. Pulverizing, mixing, watering grading, compacting, working material etc., shall not be measured for pay but shall be subsidiary to other work. Payment shall be full compensation for all materials, labor, equipment, tools, and incidentals necessary for the completion of work. 025210 Page 4 of 4 Rev.9-2-2020 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 025223 CRUSHED LIMESTONE FLEXIBLE BASE 1. DESCRIPTION This Specification shall govern all work for furnishing and placing Crushed Limestone Flexible Base required to complete the project. 2. MATERIAL Crushed Limestone Flexible Base shall consist of crushed limestone produced from oversize quarried aggregate, sized by crushing and produced from a naturally occurring single source, meeting the requirements for Type `A' material as specified in Texas Department of Transportation (TxDOT) Specification Item 247 "Flexible Base". Crushed gravel or uncrushed gravel shall not be acceptable. No blending of sources and/or additive materials will be allowed. The material shall be free of vegetation and shall be approved by the Engineer. All acceptable material shall be screened and the oversize shall be crushed and returned to the screened material in such a manner that a uniform product will be produced which meets all of the physical requirements for Grade 1-2 as specified in TxDOT Specification Item 247 "Flexible Base". 3. TESTING The City will engage a laboratory and pay for one test each gradation, liquid limit,plasticity index, modified proctor, moisture-density relation, CBR, and necessary field densities. The Engineer may call for additional tests at any time. The cost of all retests, in case of failure to meet specifications, will be deducted from the Contractor's payment. The City will pay for proctor and soil constants and abrasion tests at the rate described in the materials testing schedule. If material changes, the Contractor shall pay the cost of additional tests required by the Engineer. The Engineer may waive testing and/or lime admix for small amounts for unimportant uses. 4. CONSTRUCTION METHODS Prior to placement of flexible base, the surface of the previous underlying course shall be finished true to line and grade as established, and in conformity with the typical section shown on the drawings. Grade tolerance shall be generally 1/2 inch, and highs and lows must approximately balance. If called for in the drawings or elsewhere in the contract documents, geogrid, as specified in City Standard Specification Section 022040 "Street Excavation", shall be placed as indicated. Flexible base shall be delivered and spread the same day if possible(no later than the next day). Base shall be mixed as required to produce a uniform mixture with water. Base shall be placed in uniform lifts not to exceed 10 inch loose lifts or 8 inch compacted lifts. Moisture and density requirements shall be as indicated on the drawings, typical minimum 98% Modified Proctor 025223 Page 1 of 2 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 (ASTM D1557) under flexible pavements or typical minimum 98% Standard Proctor (ASTM D698) under concrete pavement and to within + 2% of optimum moisture. The section may be accepted if no more than 1 of the 5 most recent moisture or density tests is outside of the specified limits, and the failed test is within+1%deviation from specified moisture or density requirements. The surface of the compacted base, after meeting moisture and density requirements, shall be primed in accordance with City Standard Specification Section 025412"Prime Coat". On completion of compaction and priming, the surface shall be smooth and conform to lines, grades, and sections shown on the drawings. Areas with any deviation in excess of 1/4 inch in cross-section and in lengths of 16 feet measured longitudinally shall be corrected by loosening, adding or removing material,reshaping, and recompacting by repriming and rolling. Moisture and density shall be maintained until the paving is complete. Excessive loss of moisture shall be prevented by sprinkling, sealing, or covering with a subsequent layer. Should the base, due to any reason or cause, lose the required stability, density, or moisture before it is protected by placement of the next layer, it shall be re-compacted, refinished, and retested at the expense of the Contractor until acceptable to the City. 5. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, crushed limestone flexible base shall be measured by the square yard complete in place. Payment shall be full compensation for all materials, royalty, hauling, placing, compacting, labor, equipment, tools, and incidentals necessary for the completion of work. Prime shall be measured and paid under separate bid item if specified on the Bid Form. Geogrid shall be measured and paid under separate bid item if specified on the Bid Form. 025223 Page 2 of 2 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 025404 ASPHALTS, OILS AND EMULSIONS 1. DESCRIPTION This specification shall govern all work for asphalt cement, cut-back and emulsified asphalts, performance-graded asphalt binders, and other miscellaneous asphaltic materials required to complete the project. 2. MATERIALS When tested according to Texas Department of Transportation Test Methods,the various materials shall meet the applicable requirements of TxDOT Specification Item 300, "Asphalts, Oils, and Emulsions" (Latest Edition). 3. STORAGE, HEATING AND APPLICATION TEMPERATURES Store and apply asphaltic materials in accordance with TxDOT Item 300 (Latest Edition) at the lowest temperature yielding satisfactory results. Follow the manufacturer's instructions for any agitation requirements in storage and in application and storage temperatures. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form,asphalts,oils and emulsions shall not be measured and paid for separately, but shall be considered subsidiary to the appropriate bid item. 025404 Page 1 of 1 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 025412 PRIME COAT 1. DESCRIPTION This specification shall consist of an application of asphalt material on the completed base course and/or other approved area in accordance with this specification. Prime Coat shall not be applied when the air temperature is below 60°F and falling, but it may be applied when the air temperature is above 50°F and is rising; the air temperature being taken in the shade and away from artificial heat. Asphalt material shall not be placed when general weather conditions, in the opinion of the Engineer, are not suitable. 2. MATERIALS The asphalt material used for the prime coat shall be MC-30 medium-curing cutback asphalt or AE-P asphalt emulsion prime, unless otherwise specified, and when tested by approved laboratory methods shall meet the requirements of City Standard Specification Section 025404 "Asphalts, Oils and Emulsions". Blotter material shall be native sand. 3. CONSTRUCTION METHODS When, in the opinion of the Engineer, the area and/or base is satisfactory to receive the prime coat, the surface shall be cleaned of dirt, dust, and other deleterious matter by sweeping or other approved methods. If found necessary by the Engineer, the surface shall be lightly sprinkled with water just prior to application of the asphalt material. The asphalt material shall be applied on the clean surface by an approved type of self-propelled pressure distributor so operated as to distribute the material in the quantity specified, evenly and smoothly under a pressure necessary for proper distribution. The Contractor shall provide all necessary facilities for determining the temperature of the asphalt material in all of the heating equipment and in the distributor, for determining the rate at which it is applied, and for securing uniformity at the junction of two distributor loads. All storage tanks, piping, retorts, booster tanks and distributors used in storing or handling asphalt material shall be kept clean and in good operating condition at all times, and they shall be operated in such manner that there will be no contamination of the asphalt material with foreign material. It shall be the responsibility of the Contractor to provide and maintain in good working order a recording thermometer at the storage-heating unit at all times. The distributor shall have been recently calibrated and the Engineer shall be furnished an accurate and satisfactory record of such calibration. After beginning of the work, should the yield on the asphalt material applied appear to be in error, the distributor shall be calibrated in a manner satisfactory to the Engineer before proceeding with the work. 025412 Page 1 of 2 Rev.1030-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Prime shall be applied at a temperature within the recommended range per City Standard Specification Section 025404 "Asphalts, Oils and Emulsions", with that range being 70 to 150 degrees F. Application rate shall be not less than 0.15 gallon per square yard, unless otherwise specified. The Contractor shall be responsible for the maintenance of the surface until the Engineer accepts the work. No traffic hauling or placement of any subsequent courses shall be permitted over the freshly applied prime coat until authorized by the Engineer. Spread blotter material before allowing traffic to use a primed surface. Allow sufficient time for the prime coat to cure properly before applying surface treatment or asphaltic concrete pavement. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, prime coat shall be measured by the gallon of asphalt material applied. Payment shall include furnishing, heating, hauling and distributing the asphalt material as specified; for furnishing, spreading and removing sand blotter material; for all freight involved; and for all manipulation, labor, materials, tools, equipment and incidentals necessary to complete the work. 025412 Page 2 of 2 Rev.1030-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 025424 HOT MIX ASPHALTIC CONCRETE PAVEMENT (Class A) 1. DESCRIPTION This specification shall govern all work required for furnishing and laying Hot Mix Asphalt Concrete (HMAC) surface, binder and base courses required to complete the project. All subsurface utilities must be inspected, tested, and accepted prior to any paving. 2. MATERIALS 2.1. Aggregate. The aggregate shall consist of a blend of course aggregate, fine aggregate and, if required, a mineral filler. 2.1.1. Coarse Aggregate shall consist of that fraction of aggregate retained on a No. 10 sieve and shall consist of crushed furnace slag, crushed stone, or crushed gravel. Deleterious material in course aggregate shall not exceed 2% per TxDOT Test Method TEX-217-F. Course aggregate shall be crushed such that a minimum of 85%of the particles have more than one crushed face, unless noted otherwise on the plans. Los Angeles abrasion losses for course aggregate shall not exceed 40%by weight for the surface course and 45%for the binder and base courses per TxDOT Test Method TEX-410-A. Polish Value not less than 30 for aggregate used in the surface course per TxDOT Test Method TEX-438-A. 2.1.2. Fine Aggregate is defined as the fraction passing a No. 10 sieve and shall be of uniform quality. Fine aggregate shall consist of screenings of material that pass the Los Angeles abrasion requirements in paragraph 2.1.1 above. Screenings shall be blended with a maximum of 15% uncrushed aggregate or field sand for Type D mixes, or a maximum of 10%uncrushed aggregate or field sand for Type A, B, and C mixes. Grading of fine aggregate shall be as follows: Sieve Size Percent Passing by Weight No. 10 100 No. 200 0-15 025424 Page 1 of 8 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 2.1.3 Filler shall consist of dry stone dust,Portland cement,hydrated lime, or other mineral dust approved by the Engineer. Grading of filler shall be as follows: Sieve Size Minimum Percent Passing by Weight No. 30 95 No. 80 75 No. 200 55 2.2. Reclaimed Asphalt Pavement(RAP). Reclaimed asphalt pavement maybe incorporated into the hot mix asphalt concrete furnished for the project, provided that the mixture is designed per the TxDOT Methods and meets the applicable provisions of said TxDOT Item 340 and this specification. 2.3. Asphalt. Asphalt Material shall be in accordance with Standard Specification Section 025404 "Asphalt, Oils and Emulsions" and AASHTO. 2.3.1. Paving Mixture: APPLICATION ASPHALT GRADE Residential or low volume PG 64-22 Collector Surface Course PG 70-22 Binder Course PG 64-22 Arterial Surface Course PG 76-22 Binder Course PG 64-22 Base Courses PG 64-22 2.3.2. Tack Coat shall consist of an emulsion, SS-1 diluted with equal volume of water and applied at a rate ranging from 0.05 to 0.15 gallon per square yard. 3. PAVING MIXTURE 3.1. Mix Design. The mixture shall be designed in accordance with TxDOT Bulletin C-14 and TxDOT Test Method TEX-204-F to conform to the requirements of this specification. The Contractor shall furnish the mix design for the j ob-mix to be used for the project,unless shown otherwise on the drawings. The mix design shall be submitted prior to placement of the mixture. The design procedures are actually intended to result at a job-mix with properties in compliance with these specifications,and when properly placed the job-mix will be durable 025424 Page 2 of 8 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 and stable. The sieve analysis of the job-mix shall be within the range of the Master Gradation and Tolerances specified herein. The job-mix shall meet the density and stability requirements as specified and shall be included with the mix design as submitted per above. If the specific gravity of any of the types of aggregates differs by more than 0.3,use volume method. Plot sieve analysis of job-mix;percent passing versus size on four-cycle semi-log paper or other appropriate type paper. Show tolerance limits and Limits of Master Gradation. 3.2. Master Gradation of Aggregate. The aggregate for the type of mix specified shall be within the following tabulated limits per TxDOT Test Method TEX-200-F (Dry Sieve Analysis): Type Sieve A B C D Size Course Fine Course Fine Base Base Surface Surface 1-1/2" 100 1-1/4" 95-100 1" 100 7/8" 70-90 95-100 100 5/8" 75-95 95-100 1/2" 50-70 100 3/8" 60-80 70-85 85-100 1/4" No. 4 30-50 40-60 43-63 50-70 No. 10 20-34 27-40 30-40 32-42 No. 40 5-20 10-25 10-25 11-26 No. 80 2-12 3-13 3-13 4-14 No. 200 1-6* 1-6* 1-6* 1-6* VMA minimum 11 12 13 14 025424 Page 3 of 8 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 * 2-8 when TxDOT Test Method Tex-200-F,Part H(Washed Sieve Analysis)is used. 3.3. Tolerances. The mixture delivered to the job site shall not vary from the job-mix by more than the tolerances specified below. The gradation of the produced mix shall not fall outside the Master Grading Limits, with the following exceptions: for Type B material coarser than 3/8" and for Type D material coarser than 94. Variations from job-mix shall not exceed the following limits, except as noted above: Item: Tolerances Percent by Weight or Volume V to No. 10 Plus or Minus 5.0 No. 40 to No. 200 Plus or Minus 3.0 Asphalt Weight Plus or Minus 0.5 Asphalt Volume Plus or Minus 1.2 3.4. Mix Properties. The mixture shall have a minimum Hveem stability of 40 for Type A, B, and C mixes, and 35 for Type D mixes per TxDOT Test Method TEX-208-F at an optimum density of 96% (plus or minus 1.5) of theoretical maximum density per TxDOT Test Methods TEX-227-F and TEX-207-F. 3.5. Sampling and Testing of Raw Materials. The Contractor shall sample materials as necessary to produce a mix in compliance with these specifications. 4. EQUIPMENT 4.1. Mixing_ Plants. Mixing plants shall be either the weigh batching type or the drum mix type. Both types shall be equipped with satisfactory conveyors, power units, aggregate handling equipment, aggregate screens and bins (weigh batch only), and pollution control devices as required. 4.2. Truck Scales. A set of truck scales, if needed for measurement, shall be placed at a location approved by the Engineer. 4.3. Asphalt Material Heating Equipment. Asphalt material heating equipment shall be adequate to heat the required amount of material to the desired temperature. Agitation with steam or air will not be permitted. The heating apparatus shall be equipped with a recording thermometer with a 24-hour continuous chart that will record the temperature of the asphalt at the highest temperature. 4.4. Surge-Storage System. A surge-storage system may be used provided that the mixture coming out of the bins is of equal quality to that coming out of the mixer. The system shall be equipped with a gob hopper, rotating chute or other devices designed to minimize segregation of the asphalt mixture. 4.5. Laydown Machine. The laydown machine shall be capable of producing a surface that will meet the requirements of the typical cross section, of adequate power to propel the 025424 Page 4 of 8 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 delivery vehicles,and produce the surface tolerances herein required. It shall be wide enough to lay a 28-foot street(back-to-back of curbs) in a maximum of two passes. 4.6. Rollers. All rollers shall be self-propelled and of any type capable of obtaining the required density. Rollers shall be in satisfactory operating condition and free from fuel, hydraulic fluid, or any other fluid leaks. 5. STORAGE, PROPORTIONING AND MIXING 5.1. Storage and Heating of f Asphalt Materials. Asphalt cement shall not be heated to a temperature in excess of that recommended by the producer. Asphalt storage equipment shall be maintained in a clean condition and operated in such a manner that there will be no contamination with foreign matter. 5.2. Feeding and Dryin _g of Aggregates. The Aggregates. The feeding of various sizes of aggregate to the dryer shall be done in such a manner that a uniform and constant flow of materials in the required proportions will be maintained. In no case shall the aggregate be introduced into the mixing unit at a temperature in excess of 350 degrees F. 5.3. Proportioning. All materials shall be handled and proportioned in a manner that yield an acceptable mixture as herein specified and as defined by the job-mix. 5.4. Mixing. 5.4.1. Weigh Batch Plant. In charging the weigh box and in charging the pugmill from the weigh box,such methods or devices shall be used as necessary to minimize segregation of the mixture. 5.4.2. Drum Mix Plant. The amount of aggregate and asphalt cement entering the mixer and the rate of travel through the mixer shall be coordinated so that a uniform mixture of the desired gradation and asphalt content will be produced. 5.4.3. The mixture produced from each type of plant shall not vary from the'o� b-mix by more than the tolerances and restrictions herein specified. The mixture when discharged from the plant shall have a moisture content not greater than one percent by weight of total mix when determined by TxDOT Test Method TEX-212-F. 5.4.4. The mixture produced from each type of plant shall be at a temperature between 250 and 325 degrees F. After a target mixing temperature has been established, the mixture when discharged from the mixer shall not vary from this temperature by more than 25 degrees F. 6. CONSTRUCTION METHODS 6.1. Construction Conditions. For mat thicknesses greater than 1.5 inches, the asphalt material may be placed with a laydown machine when the air temperature is 40 degrees F and 025424 Page 5 of 8 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 rising but not when the air temperature is 50 degrees F and falling. In addition,mat thickness less than and including 1.5 inches shall not be placed when the temperature of the surface on which the mat is placed is below 50 degrees F. All subsurface utilities shall be inspected, tested, and accepted prior to paving. 6.2. Prime Coat. If a prime coat is required, it shall be applied and paid for as a separate item conforming to the requirements of City Standard Specification Section 025412 "Prime Coat", except the application temperature shall be as provided above. The tack coat or asphaltic concrete shall not be applied on a previously primed flexible base until the primed base has completely cured to the satisfaction of the Engineer. 6.3. Tack Coat. Before the asphalt mixture is laid,the surface upon which the tack coat is to be placed shall be thoroughly cleaned to the satisfaction of the Engineer. The surface shall be given a uniform application of tack coat using materials and rates herein specified and/or as shown on the plans. The tack coat shall be rolled with a pneumatic tire roller as necessary. Tack coat is required before any pavement course not placed immediately following the previous course placement. 6.4. Transporting Asphalt Concrete. The asphalt mixture shall be hauled to the job site in tight vehicles previously cleaned of all foreign matter. In cool weather or for long hauls, canvas covers and insulated truck beds may be necessary. The inside of the bed may be given a light coating of lime water or other suitable release agent necessary to prevent from adhering. Diesel oil is not allowed. 6.5. Placing. The asphalt mixture shall be spread on the approved prepared surface with a laydown machine or other approved equipment in such a manner that when properly compacted, the finished surface will be smooth and of uniform density, and meet the requirements of the typical cross section as shown on the plans. 6.5.1. Flush Structures. Adjacent to flush curbs, gutters, liners and structures, the surface shall be finished uniformly high so that when compacted, it will be slightly above the edge of the curb and flush structure. 6.5.2. Construction joints of successive courses of asphaltic material shall be offset at least six inches. Construction joints on surface courses shall coincide with lane lines, or as directed by the Engineer,but shall not be in the anticipated wheel path of the roadway. 6.6. Compacting. The asphalt mixture shall be compacted thoroughly and uniformly with the necessary rollers to obtain the required density and surface tolerances herein described and any requirements as shown on the plans. Regardless of the method of compaction control followed, all rolling shall be completed before the mixture temperature drops below 175 degrees F. 025424 Page 6 of 8 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 6.7. In-Place Density. In-place density control is required for all mixtures except for thin, irregular level-up courses. Material should be compacted to between 96% and 92% of maximum theoretical density or between 4% and 8% air voids. Average density shall be greater than 92%and no individual determination shall be lower than 90%. Testing shall be in accordance with TxDOT Test Methods TEX-207-F and TEX-227-F. Pavement specimens,which shall be either cores or sections of the compacted mixture,will be tested as required to determine the percent air voids. Other methods, such as nuclear determination of in-place density,which correlate satisfactorily with actual project specimens may be used when approved by the Engineer. 6.8. Thickness. The total compacted average thickness of the combined HMAC courses shall not be less than the amount specified on the drawings. No more than 10% of the measured thickness(es)shall be more than 1/4 inch less than the plan thickness(es). If so,the quantity for pay shall be decreased as deemed appropriate by the Engineer. 6.9. Surface Smoothness Criteria and Tests. The pavement surface after compaction, shall be smooth and true to the established lines, grade and cross-section. The surface shall be tested by the City with the Mays Roughness Meter. The Mays Roughness Value for each 600-foot section shall not exceed ninety inches per mile per traffic lane. For each 600-foot section not meeting this criteria, the Engineer shall have the option of requiring that section to be reworked to meet the criteria,or paying an adjusted unit price for the surface course. The unit price adjustment shall be made on the following basis: Adjusted Unit Price= (Adjustment Factor)X Surface Course Unit Bid Price The adjustment factor shall be: For Residential Streets: Adjustment Factor= 1.999 - 0.0111 M For All Other Class Streets (Non Residential) Adjustment Factor= 1.287 - 0.0143 M Where M =Mays Roughness Value In no case shall the Contractor be paid more than the unit bid price. If the surface course is an inverted penetration (surface treatment) the Mays Roughness Value observed will be reduced by ten inches per mile,prior to applying the above criteria. Localized defects (obvious settlements, humps, ridges, etc.) shall be tested with a ten-foot straightedge placed parallel to the roadway centerline. The maximum deviation shall not 025424 Page 7 of 8 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 exceed 1/8 inch in ten feet. Areas not meeting this criteria shall be corrected to the satisfaction of the Engineer. Pavement areas having surface irregularities, segregation, raveling or otherwise deemed unacceptable by the Engineer shall be removed and replaced by the Contractor in a manner approved by the Engineer, at no additional cost to the City. 6.10. Opening to Traffic. The pavement shall be opened to traffic when directed by the Engineer. The Contractor's attention is directed to the fact that all construction traffic allowed on pavement open to the public will be subj ect to the State laws governing traffic on highways. If the surface ravels, it will be the Contractor's responsibility to correct this condition at his expense. 7. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, hot mix asphaltic concrete pavement shall be measured by the square yard of the type and thickness of"Hot Mix Asphaltic Concrete" as shown on the drawings. The Contractor shall provide the Engineer with copies of the "pay ticket" identifying the truck and showing the gross empty weight of the truck with driver as it arrives at the plant and the gross loaded weight of the truck with driver as it leaves the plant. The measured amount will be the difference of the loaded and empty trucks converted to tons. Payment shall be full compensation for quarrying,furnishing all materials,freight involved; for all heating, mixing, hauling, cleaning the existing base course or pavement, tack coat, placing asphaltic concrete mixture, rolling and finishing; and for all manipulations, labor, tools, equipment, and incidentals necessary to complete the work except prime coat when required. Prime coat,performed where required,will be measured and paid for in accordance with the provisions governing City Standard Specification Section 025412 "Prime Coat". All templates, straightedges, scales, and other weight and measuring devices necessary for the proper construction, measuring and checking of the work shall be furnished, operated and maintained by the Contractor at his expense. Any paving placed prior to inspection,testing, and acceptance of underground utilities may be rejected by the City and will be replaced at the Contractor's expense after correcting any subsurface utility defects. Pavement that fails to meet the in place density criteria may be rejected by the City and will be replaced at the Contractor's expense,or such pavement may, at the City's discretion, be accepted by the City and the unit price for payment shall be reduced as deemed appropriate by the Engineer. 025424 Page 8 of 8 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 025608 INLETS 1. DESCRIPTION This specification shall govern for the construction of inlets complete in place and the materials used therein, including the installation, and the furnishing of frames, grates, rings and covers. 2. TYPES The various types of inlets are designated on the drawings by letters or by numbers indicating the particular design of each. Each type shall be constructed in accordance with the details shown on the drawings and to the depth required by the profiles and schedules given. 3. MATERIALS (1) Concrete. Concrete for curb inlets shall be Class "A" concrete conforming to the requirements of City Standard Specification Section 038000 "Concrete Structures", and City Standard Specification Section 030020 "Portland Cement Concrete", except as otherwise provided on the drawings. Concrete for grate inlets, drop inlets and post inlets shall be Class "C" concrete in accordance with City Standard Specification Section 030020 "Portland Cement Concrete". (2) Mortar. Mortar shall be composed of one part Portland cement and two parts clean, sharp mortar sand suitably graded for the purpose by conforming in other respects to the provisions of City Standard Specification Section 030020 "Portland Cement Concrete" for fine aggregate. Hydrated lime or lime putty may be added to the mix but in no case shall it exceed 10 percent by weight of the total dry mix. (3) Reinforcing Steel. Reinforcing Steel shall conform to the requirements of City Standard Specification Section 032020 "Reinforcing Steel". (4) Concrete Blocks. Concrete blocks, when shown on the drawings, shall conform to the requirements of ASTM C 139. (5) Frames, Grates, Rings and Covers. Frames, grates, rings and covers shall conform to the requirements of City Standard Specification Section 055420 "Frames, Grates, Rings and Covers". (6) Cast Iron. Cast iron for supports and inlet units shall conform to the shape and dimensions shown on the plans. The castings shall be clean and perfect, free from sand or blow holes or other defects. Cast iron castings shall conform to the requirements of"Gray Iron Castings" ASTM A 48, Class 30. 025608 Page 1 of 2 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 4. CONSTRUCTION METHODS (1) General. All concrete work shall be performed in accordance with the requirements of City Standard Specification Section 038000 "Concrete Structures", unless otherwise specified. Forms will be required for all concrete walls, except where the nature of the surrounding material is such that it can be trimmed to a smooth vertical face. (2) Inlets for Precast Concrete Pipe Sewers. The construction of inlets for precast concrete pipe sewers shall be done as soon as is practicable after sewer lines into or through inlet locations are completed. All sewers shall be cut neatly at the inside face of the walls of inlet and pointed up with mortar. Subgrade under cast-in-place and precast inlets shall be compacted to not less than 95% Standard Proctor density. (3) Inverts. The inverts passing out or through the inlet shall be shaped and routed across the floor of inlet as shown on the plans. This shaping may be accomplished by adding and shaping mortar or concrete after the base is cast or by placing the required additional material with the base. (4) Finishing Complete Inlets. Inlets shall be completed in accordance with the drawings. Backfilling to finish grade elevation with native material, free of debris and compacted to over 95% Standard Proctor density. Backfilling shall be in accordance with the provisions of City Standard Specification Section 022020 "Excavation and Backfill for Utilities". 5. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, inlets shall be measured as individual units by each inlet, complete in place. Extension to inlets will be measured by each extension separately from the inlet. Excavation, backfill, frames, grates, rings and covers will be considered subsidiary to the construction of the inlets. Payments shall be full compensation for furnishing all concrete, reinforcing steel, mortar, castings, frames, grates, rings and covers, and for all other materials, labor,tools, equipment and incidentals required to perform the work prescribed above. 025608 Page 2 of 2 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 025610 CONCRETE CURB AND GUTTER 1. DESCRIPTION This specification shall consist of Portland cement concrete combined concrete curb and gutter or separate concrete curb with or without reinforcing steel as required, constructed on an approved subgrade or foundation material in accordance with these specifications, in conformity with the lines and grades established by the Engineer and details shown on the drawings. 2. MATERIALS Unless otherwise specified on the drawings, materials and proportions for concrete used in construction under this specification shall conform to the requirements as specified for Class "A" Concrete under City Standard Specification Section 030020 "Portland Cement Concrete". Reinforcing steel shall conform to the requirements as specified in City Standard Specification Section 032020 "Reinforcing Steel". Expansion joint filler shall be redwood material meeting the requirements specified in City Standard Specification Section 038000 "Concrete Structures". 3. CONSTRUCTION METHODS The foundation shall be excavated and shaped to line, grade and cross-section, and hand tamped and sprinkled. If dry, the subgrade or foundation material shall be sprinkled lightly with water and compacted to not less than 98% Standard Proctor density, or as required on the drawings. Flexible base shall be compacted to specified density and moisture immediately before concrete is deposited thereon. Outside forms shall be of wood or metal, of a section satisfactory to the Engineer, straight, free of warp, and of a depth equal to the depth of the curb and gutter. They shall be securely staked to line and grade, and maintained in a true position during the depositing of concrete. Inside forms for the curb shall be approved material, shall be of such design as to provide the curb required, and shall be rigidly attached to the outside forms. For reinforced concrete roadways, all jointing must be reflected through the curb, including redwood expansion joints and construction joints. Driveway gutter shall be placed integrally with the driveway as shown on the City Standard Details. The reinforcing steel shall be placed in position as shown on the typical details. Care shall be exercised to keep all reinforcing steel in its proper location. Concrete for curb and gutter shall be mixed in a manner satisfactory to the Engineer. The curb and gutter shall be placed in sections of the length indicated on the plans, and each section shall be separated by a premolded insert or board joint of cross-section specified for the curb and gutter, and of the thickness indicated on the drawings. 025610 Page 1 of 2 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 After the concrete has been struck off and after it has become sufficiently set, the exposed surfaces shall be thoroughly worked with a wooden float. The exposed edges shall be rounded by the use of an edging tool to the radius indicated on the drawings. All exposed surfaces of curb and gutter, or curb, shall be brushed to a smooth and uniform surface. The completed curb and gutter shall be cured with Type 2, white pigmented curing compound unless shown otherwise on the drawings. Other methods of curing as outlined in City Standard Specification Section 038000 "Concrete Structures" will be acceptable with a required curing period of 72 hours. The area behind the curb shall be backfilled, tamped, and sloped as directed as soon as possible and no later than 48 hours after the removal of forms. Backfill shall be placed to the full height of the curb, or as otherwise specified. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, concrete curb and gutter or concrete curb will be measured by the linear foot for each type of curb, complete in place. Payment shall be full compensation for preparing the subgrade; for furnishing and placing all materials including reinforcing steel and expansion joint material; for furnishing,placing, shaping and tamping backfill; and for all manipulation, labor,tools, equipment and incidentals necessary to complete the work. 025610 Page 2 of 2 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 025612 CONCRETE SIDEWALKS AND DRIVEWAYS 1. DESCRIPTION This specification shall consist of sidewalks and driveways, with or without reinforcing steel, composed of Portland cement concrete,constructed as herein specified on an approved subgrade,in conformity with the lines and grades established by the Engineer and the details shown on the drawings. 2. MATERIALS Materials and proportions used in construction under this item shall conform to the requirements as specified for Class"A" concrete under City Standard Specification Section 030020"Portland Cement Concrete". Reinforcing steel shall conform to the requirements as specified in City Standard Specification Section 032020 "Reinforcing Steel". Expansion joint filler shall be redwood meeting the requirements specified in City Standard Specification Section 038000"Concrete Structures". Cap seal shall be "Greenstreak" or approved equal. 3. CONSTRUCTION METHODS The subgrade shall be excavated, compacted and shaped to line, grade and cross-section and hand tamped and sprinkled with water. Subgrade under concrete sidewalks and driveways shall be compacted to not less than 95% Standard Proctor density. The subgrade shall be within 0-3% of optimum moisture content at the time the concrete is placed. Forms shall be of wood or metal, of a section satisfactory to the Engineer, straight, free from warp, and of a depth equal to the thickness of the finished work. They shall be securely staked to line and grade and maintained in a true position during the depositing of concrete. The reinforcing steel shall be placed in position as shown on the drawings. Care shall be exercised to keep all reinforcing steel in its proper location. Driveways shall incorporate the gutter in a unified concrete placement as shown in the City Standard Detail for driveways. Sidewalks shall be constructed in sections of the lengths shown on drawings. Unless otherwise provided by the drawings,no section shall be of a length less than 8 feet, and any section less than 8 feet shall be removed by the Contractor at his own expense. 025612 Page 1 of 2 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 The different sections shall be separated by a premolded insert or board j oint of the thickness shown on the drawings, placed vertically and at right angles to the longitudinal axis of the sidewalks. Where the sidewalk or driveways abut a curb or retaining wall, approved expansion joint material shall be placed along their entire length. Similar expansion joint material shall be placed around all obstructions protruding through sidewalks or driveways. Concrete shall be mixed in a manner satisfactory to the Engineer,placed in the forms to the depth specified and spaded and tamped until thoroughly compacted and mortar entirely covers the surface. The top surface shall be floated with a wooden float to a gritty texture. The outer edges and joints shall then be rounded with approved tools to the radii shown on drawings. 5-foot wide sidewalks shall be marked into separate sections, each 5 feet in length, by the use of approved jointing tools. For other widths of sidewalk,joints to be spaced longitudinally to match the transverse width. When completed,the sidewalks and driveways shall be cured with Type 2,white pigmented curing compound. Other methods of curing as outlined in City Standard Specification Section 038000 "Concrete Structures" will be acceptable with a required curing period of 72 hours. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form,concrete sidewalks and driveways shall be measured by the square foot of surface area of completed sidewalks, driveways, or sidewalks and driveways, as indicated on the drawings. Payment shall be full compensation for preparing and compacting the subgrade; for furnishing and placing all materials including concrete, reinforcing steel and expansion joint material; and for all manipulation, labor,tools, equipment and incidentals necessary to complete the work. 025612 Page 2 of 2 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 025620 PORTLAND CEMENT CONCRETE PAVEMENT 1. DESCRIPTION This specification shall govern for the construction of Portland cement concrete pavement on a prepared subgrade or base course, in accordance with the typical sections shown on the drawings. The concrete shall be composed of Portland cement, aggregates (fine and coarse), admixtures if desired or required, and water,proportioned and mixed as hereinafter provided. All subsurface utilities must be inspected, tested, and accepted prior to any paving. 2. MATERIALS (1) Cement The cement shall be either Type I, Type II or Type III Portland cement conforming to ASTM Designation: C150, modified as follows: Unless otherwise specified by the Engineer, the specific surface area of Type I and II cements shall not exceed 2000 square centimeters per gram (Wagner Turbidimeter— TxDOT Test Method Tex-310-D). The Contractor shall furnish the Engineer with a statement as to the specific surface area of the cement, expressed in square centimeters per gram, for each shipment. For concrete pavements, strength requirements shall be demonstrated using flexural (beam) or compressive(cylinder)tests as required in the drawings. Either Type I or II cement shall be used unless Type II is specified on the plans. Except when Type II is specified on the plans, Type III cement may be used when the anticipated air temperature for the succeeding 12 hours will not exceed 60°F. Type III cement shall be used when high early strength concrete pavement is specified on the drawings. Different types of cement may be used in the same project, but all cement used in any one monolithic placement of concrete pavement shall be of the same type and brand. Only one brand of each type of cement will be permitted in any one project unless otherwise authorized by the Engineer. Cement may be delivered in bulk where adequate bin storage is provided. All other cement shall be delivered in bags marked plainly with the name of the manufacturer and the type of cement. Similar information shall be provided in the bills of lading accompanying each shipment of packaged or bulk cement. Bags shall contain 94 pounds net. All bags shall be in good condition at time of delivery. All cement shall be properly protected against dampness. No caked cement will be accepted. 025620 Page 1 of 5 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Cement remaining in storage for a prolonged period of time may be retested and rejected if it fails to conform to any of the requirements of these specifications. (2) Mixing Water Water for use in concrete and for curing shall be in accordance with City Standard Specification Section 030020"Portland Cement Concrete". (3) Coarse Aggregate Coarse aggregate for use in concrete mixture shall be in accordance with City Standard Specification Section 030020"Portland Cement Concrete", Grade No. 2. (4) Fine Aggregate Fine aggregate for use in concrete mixture shall be in accordance with City Standard Specification Section 030020"Portland Cement Concrete", Grade No. 1. (5) Mineral Filler Mineral filler shall consist of stone dust, clean crushed sand, or other approved inert material. (6) Mortar(Grout) Mortar for repair of concrete pavements shall consist of 1 part cement, 2 parts finely graded sand, and enough water to make the mixture plastic. When required to prevent color difference, white cement shall be added to produce the color required. When required by the Engineer, latex adhesive shall be added to the mortar. (7) Admixtures Calcium chloride will not be permitted. Unless otherwise noted, air-entraining, retarding and water-reducing admixtures may be used in all concrete and shall conform to the requirements of City Standard Specification Section 030020 "Portland Cement Concrete". (8) Reinforcing Steel Unless otherwise designated on the plans, all steel reinforcement shall be deformed bars, and shall conform to ASTM Designation: A615, Grade 60, and shall be open hearth, basic oxygen or electric furnace new billet steel in accordance with City Standard Specification Section 032020 "Reinforcing Steel". Dowels shall be plain billet steel smooth bars conforming to ASTM Designation: A615, Grade 60, and shall have hot-dip galvanized finish. 3. STORAGE OF MATERIALS All cement and aggregate shall be stored and handled in accordance with City Standard Specification Section 030020"Portland Cement Concrete". 025620 Page 2 of 5 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 4. MEASUREMENT OF MATERIALS Measurement of the materials, except water, used in batches of concrete, shall be in accordance with City Standard Specification Section 030020 "Portland Cement Concrete". 5. CLASSIFICATION AND MIX DESIGN It shall be the responsibility of the Contractor to furnish the mix design to comply with the requirements herein and in accordance with THD Bulletin C-11. The Contractor shall perform, at his own expense, the work required to substantiate the design, except the testing of strength specimens, which will be done by the Engineer. Complete concrete design data shall be submitted to the Engineer for approval. It shall also be the responsibility of the Contractor to determine and measure the batch quantity of each ingredient, including all water, so that the mix conforms to these specifications and any other requirements shown on the plans. In lieu of the above mix design responsibility, the Contractor may accept a design furnished by the Engineer; however, this will not relieve the Contractor of providing concrete meeting the requirements of these specifications. Trial batches will be made and tested using all of the proposed ingredients prior to placing the concrete, and when the aggregate and/or brand of cement or admixture is changed. Trial batches shall be made in the mixer to be used on the job. When transit mix concrete is to be used, the trial designs will be made in a transit mixer representative of the mixers to be used. Batch size shall not be less than 50 percent of the rated mixing capacity of the truck. Mix designs from previous or concurrent jobs may be used without trial batches if it is shown that no substantial change in any of the proposed ingredients has been made. This specification section incorporates the requirements of City Standard Specification Section 030020"Portland Cement Concrete". 6. CONSISTENCY In cases where the consistency requirements cannot be satisfied without exceeding the maximum allowable amount of water, the Contractor may use, or the Engineer may require, an approved water-reducing or retarding agent, or the Contractor shall furnish additional aggregates or aggregates with different characteristics, which will produce the required results. Additional cement may be required or permitted as a temporary measure until aggregates are changed and designs checked with the different aggregates or admixture. The consistency of the concrete as placed should allow the completion of all finishing operations without the addition of water to the surface. When field conditions are such that additional moisture is needed for the final concrete surface finishing operation, the required water shall be applied to the surface by fog spray only, and shall be held to a minimum. The concrete shall be 025620 Page 3 of 5 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 workable, cohesive, possess satisfactory finishing qualities, and of the stiffest consistency that can be placed and vibrated into a homogenous mass. Excessive bleeding shall be avoided. Slump requirements shall be as specified in Table 1. TABLE 1 Slump Requirements Construction Method Desired Slump Minimum Slump Maximum Slump Concrete Pavement(slipformed) 1.5 inches 1 inch 3 inches Concrete Pavement(formed) 4 inches 2.5 inches 6.5 inches NOTE: No concrete will be permitted with slump in excess of the maximum shown. 7. QUALITY OF CONCRETE The concrete shall be uniform and workable. The cement content, maximum allowable water- cement ratio, desired slump, minimum slump, maximum slump, and the strength requirements of the class of concrete for concrete pavement shall conform to the requirements of Table 1 and Table 2 and as required herein. During the process of the work, the Engineer will cast test beams or cylinders as a check on the flexural or compressive strength of the concrete actually placed. Testing shall be in accordance with City Standard Specification Section 030020 "Portland Cement Concrete". If the required flexural or compressive strength is not secured with the cement specified in Table 2, changes in the batch design will be made. The concrete shall meet either the minimum flexural (beam) strength (7-day or 28-day) or minimum compressive strength (7-day or 28-day) shown in Table 2. TABLE 2 Class of Concrete for Concrete Pavement Class Minimum Minimum Maximum of Flexural(Beam) Compressive Water-Cement Coarse Concrete Strength Strength Ratio Aawregate P* 450 psi(7 days) 3200 psi(7 days) 5.6 gal./sack No.2(1'/?) 570 psi(28 days) 4000 psi(28 days) 0.50 * 5%entrained air 8. MIXING CONDITIONS The concrete shall be mixed in quantities required for immediate use. Any concrete which is not in place within the limits outlined in City Standard Specification Section 038000 "Concrete Structures", Article "Placing Concrete-General", shall not be used. Re-tamping of concrete will not be permitted. 025620 Page 4 of 5 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Mixing conditions shall conform to the requirements of City Standard Specification Section 030020 "Portland Cement Concrete". 9. MIXING AND MIXING EQUIPMENT Mixing and mixing equipment shall conform to the requirements of City Standard Specification Section 030020"Portland Cement Concrete". 10. READY-MIX PLANTS The requirements for ready-mix plants shall be as specified in City Standard Specification Section 030020"Portland Cement Concrete". 11. PLACING, CURING AND FMSHING All subsurface utilities must be inspected, tested, and accepted prior to any paving. Subgrade preparation shall be as specified on the plans. The placing of concrete, including construction of forms and falsework, curing and finishing shall be in accordance with City Standard Specification Section 038000 "Concrete Structures". For membrane curing, curing material shall conform to Type 2, Class A curing compound, or as otherwise shown on the drawings. 12. JOINTS IN CONCRETE PAVEMENT The placing of joints in concrete pavement shall be in accordance with City Standard Specification Section 038000 "Concrete Structures" and as detailed on the drawings. 13. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, the quantities of concrete for concrete pavement(s), which will constitute the completed and accepted pavement(s) in-place, will be measured by the square yard or square foot for the indicated thickness and type of cement. Payment shall be full compensation for furnishing, hauling, mixing, placing, curing and finishing all concrete; all grouting and pointing; furnishing and placing reinforcing steel and steel dowels as shown on the plans; furnishing and placing drains; furnishing and placing metal flashing strips; furnishing and placing expansion joint material, joint filler and sealants, and contraction (control) joints required by this specification or shown on the plans; and for all forms and falsework, labor, tools, equipment and incidentals necessary to complete the work. Any paving placed prior to inspection, testing, and acceptance of underground utilities may be rejected by the City and will be replaced at the Contractor's expense after correcting any subsurface utility defects. 025620 Page 5 of 5 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 025807 PAVEMENT MARKINGS (PAINT AND THERMOPLASTIC) 1. DESCRIPTION This item shall consist of markings and stripes on the surface of the roadways or parking facilities applied in accordance with this specification and at the locations shown on the drawings or as directed by the Engineer. 2. MATERIALS Type I Pavement Marking Materials shall be in accordance with TxDOT Departmental Material Specification DMS-8220 "Hot Applied Thermoplastic". All roadway markings shall be thermoplastic. Type II Pavement Marking Materials shall be in accordance with TxDOT Departmental Material Specification DMS-8200 "Traffic Paint" and are not to be used for roadway markings except as primer/sealer for Type 1 markings. Type II Pavement Markings shall be allowed for parking facilities if called for in the plans. Glass Traffic Beads shall be drop-on glass beads conforming to TxDOT Departmental Material Specification DMS-8290 "Glass Traffic Beads". 3. CONSTRUCTION METHODS 3.1 Weather Limitations - Pavement marking shall be performed only when the existing surface is dry and clean, when the atmospheric temperature is above 40°F., and when the weather is not excessively windy, dusty, or foggy. The suitability of the weather will be determined by the Engineer. 3.2 Equipment - All equipment for the work shall be approved by the Engineer and shall include the apparatus necessary to properly clean the existing surface, and mechanical marking machine, and such auxiliary hand painting equipment as may be necessary to satisfactorily complete the job. The mechanical marker shall be an approved atomizing spray-type marking machine suitable for application of pavement markings. It shall produce an even and uniform film thickness at the required coverage and shall be designed so as to apply markings of uniform cross-sections and clear-out edges without running of 025807 Page 1 of 3 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 spattering and within the limits for straightness set forth herein. Suitable adjustments shall be provided on the sprayer(s) of a single machine or by furnishing additional equipment for marking the width required. 3.3 Preparation of Existing Surface - Immediately before application of the paint or thermoplastic, the existing surface shall be dry and entirely free from old pavement markings and markers, dirt, grease, oil, acids, laitance, or other foreign matter which could reduce the bond between the marking and the pavement. The surface shall be thoroughly cleaned by sweeping and blowing as required to remove all dirt, laitance and loose materials. Areas that cannot be satisfactorily cleaned by brooming and blowing shall be scrubbed as directed with a water solution of trisodium phosphate (10% Na3PO4 by weight) or an approved equal solution. After scrubbing, the solution shall be rinsed off and the surface dried prior to marking. 3.4 Layouts and Alignments - Suitable layouts and lines of proposed stripes shall be spotted in advance of the marking application. Control points shall be spaced at such intervals as will insure accurate location of all markings. The Contractor shall provide an experienced technician to supervise the location, alignment, layout, dimensions, and application of the markings. At least 72 hours prior to applying the permanent pavement markings, the Contractor shall notify the Engineer and City Construction Inspector to obtain City approval for the location, alignment and layout of the pavement markings. 3.5 Application - Markings shall be applied at the locations and to the dimensions and spacing indicated on the plans or as specified. Markings shall not be applied until the layouts, indicated alignment, and the condition of the existing surface have been approved by the Engineer. In the application of straight stripes, any deviation of the edges exceeding 1/2 inch in 50 feet shall be obliterated and the marking corrected. The width of the markings shall be as designated within a tolerance of 5%. All markings shall be performed to the satisfaction of the Engineer. Paint shall be applied uniformly by suitable equipment at a rate of not less than 105 or more than 115 square feet per gallon. The Contractor shall furnish a certified report on the quality of materials ordered for the work. This report shall not be interpreted as a basis for final acceptance. The Engineer shall be notified upon arrival of shipment for inspecting and sampling of 025807 Page 2 of 3 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 the materials. When required, all emptied containers shall be returned to the paint material storage or made available for tallying by the Engineer. The containers shall not be removed from the job site or destroyed without permission. The Contractor shall make an accurate accounting of the paint materials used in the accepted work. 3.6 Protection - After application, all markings shall be protected while drying. The fresh markings shall be protected from damage of any kind. The Contractor shall be directly responsible for protecting the markings and shall erect or place suitable warning signs, flags or barricades, protective screens or coverings as required. All surfaces shall be protected from disfiguration by spatter, splashes, spillage, drippings of paint or other materials. 3.7 Defective Workmanship or Material - When any material not conforming to the requirements of the specifications or drawings has been delivered to the project or incorporated in the work, or any work performed is of inferior quality, such material or work shall be corrected as directed by the Engineer, at the expense of the Contractor. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, pavement markings shall be measured by the square foot or linear foot of each type of marking. Eliminating existing pavement markings and markers will not be measured and paid for separately, but shall be subsidiary to the pavement marking items. Payment shall be full compensation for furnishing all materials and for eliminating existing pavement markings and markers, for all preparation, layout and application of the materials, and for all labor, equipment,tools and incidentals necessary to complete the work. 025807 Page 3 of 3 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 025813 PREFORMED THERMOPLASTIC STRIPING, WORDS AND EMBLEMS 1. DESCRIPTION This specification shall govern all work for furnishing and installing preformed thermoplastic striping, words and emblems required to complete the project. 2. PRE-CONSTRUCTION CONFERENCE When required by the Engineer, prior to beginning work on the markings but after receipt by the Engineer of the required information, a conference will be held between the representatives of the Contractor and the Engineer to set up more completely the sequence of work to be followed and the estimated progress schedule. 3. MATERIALS The preformed pavement marking material shall be thermoplastic material meeting the specifications of TxDOT Departmental Material Specification DMS-8220"Hot Applied Thermoplastic,"and shall be approved by the Engineer for use on this project. 4. CONSTRUCTION (1) General. The Contractor shall furnish all materials and equipment and perform work or services necessary for complete and proper construction of the completed system of pavement markings. (2) Traffic Conditions. Roadways on which markings are to be placed may be either free of traffic or open to traffic. On roadways already open to traffic,markings shall be placed under existing traffic conditions. (3) Dimensions. Markings will be in accordance with the color, length, width, shape, configuration and location requirements of the plans and as directed by the Engineer. (4) Methods. All material placement shall be in accordance with TxDOT Standard Specification Item 668"Prefabricated Pavement Markings"and City Section 025807"Pavement Markings (Paint and Thermoplastic)." (5) Surface Preparation. The pavement upon which the markings are to be placed shall be cleaned and prepared,to the satisfaction of the Engineer,prior to placement of the markings. Cleaning shall be by any effective method, approved by the Engineer that completely and effectively removes contaminants, loose materials, and conditions deleterious to proper adhesion. Surfaces shall be further prepared after cleaning by sealing or priming, as recommended by the manufacturer of the pavement marking material. 025813 Page 1 of 3 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 (6) Moisture. Pavement to which the material is to be applied shall be completely dry. When questionable,pavements will be considered dry if, on a sunny day after observation for 15 minutes, no condensation occurs on the underside of a one (1) square foot piece of clear plastic that has been placed on the pavement and weighted down on the edges. (7) Temperature. Pavement and ambient air temperature requirements recommended by the material manufacturer shall be observed. If no temperature requirements are established by the materials manufacturer,material will not be placed if the pavement temperature is below 60 degrees F or if it is above 120 degrees F. (8) Clean-Up. At all times,the project site shall be kept free of all unnecessary traffic hazards. Upon completion of the work, the Contractor shall remove all rubbish from the work site, and shall clean and restore the area to a manner acceptable to the Engineer. Also,all damage done by the Contractor during the prosecution of the work must be repaired. Before acceptance,the work site must be neat and in a presentable condition throughout. No extra compensation will be allowed for fulfilling these clean-up requirements. 5. PERFORMANCE (1) Adhesion. Installed pavement markings shall adhere to the pavement sufficiently to prevent lifting, shifting, smearing, spreading, flowing or tearing by traffic. (2) Appearance. In addition to complying with all requirements listed herein, pavement markings shall present a neat,uniform appearance,and shall be free of unsightly conditions. Markings shall be free of ragged edges,misshapen lines or contours,and splices in transverse markings. (3) Visibili . The pavement marking material,in place on the roadway,shall have uniform and distinctive retro-reflectance when observed in accordance with TxDOT Test Method Tex- 828-B. (4) Observation Period. All material, workmanship and labor furnished shall be covered by manufacturer's guarantee and/or warranty for aperiod of 12 months commencing on the final delivery date of the materials. Pavement markings that fail to meet all requirements of this specification shall be removed and replaced at the expense of the Contractor within 30 working days following notification by the Engineer of such failure. All replacement pavement markings shall also meet all requirements of this specification for the same warranty period after installation. 025813 Page 2 of 3 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 6. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, preformed striping, words and emblems shall be measured by each type and color indicated on the Bid Form including preformed arrows and words or other symbols as indicated in the Bid Form. Payment shall be full compensation for cleaning the pavement by any suitable means other than blast cleaning,for furnishing and placing all materials, and for all labor,tools,equipment and incidentals necessary to complete the work. 025813 Page 3 of 3 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 025816 RAISED PAVEMENT MARKERS 1. DESCRIPTION This specification shall govern all work required for furnishing and installing Raised Pavement Markers required to complete the project. 2. MATERIALS RAISED PAVEMENT MARKERS shall conform to Reference Specification Section 025818 "Pavement Markers (Reflectorized)" (TxDOT Departmental Material Specification 4200). Unless indicated otherwise on the drawings, raised pavement markers and traffic buttons shall be of the type to be applied to the roadway surface with a non-integral adhesive. Types of raised pavement markers shall be as follows: TYPE DESCRIPTION I-A One face shall reflect amber light and the body other than the reflective face shall be yellow. I-C One face shall reflect white light and the body other than the reflective face shall be white, silver or light gray. I-R One face shall reflect red light and the body other than the reflective face shall be white, silver or light gray, or may be one-half red on the side that reflects red light. II-A-A Shall contain two reflective faces, each of which shall reflect amber light and the body other than the reflective faces shall be yellow. II-B-B Shall contain two reflective faces, each of which shall reflect blue light and the body other than the reflective faces shall be blue. (Fire Hydrant Application.) II-C-C Shall contain two reflective faces, each of which shall reflect white light and the body other than the reflective faces shall be white, silver or light gray. 025816 Page 1 of 2 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 II-C-R Shall contain two reflective faces, one of which shall reflect white light and the other face shall reflect red light, and the body other than the reflective faces shall be white, silver or light gray, or may be one- half red on the side that reflects red light. ADHESIVE for securing raised pavement markers to asphalt or concrete surfaces shall conform to Reference Specification Section 025828 `Bituminous Adhesive for Pavement Markers" (TxDOT Departmental Materials Specification 6130). 3. METHODS PAVEMENT SURFACE to receive raised pavement markers shall be prepared such that the surface is free of loose material, grease, moisture, and other foreign material that could impair the bond with the adhesive. ALIGNMENT AND POSITIONING of raised pavement markers shall be such that the reflective faces are aligned for proper visibility. ADHESIVE shall be applied such that 100%of the lower surface of the marker is in contact with the adhesive and in sufficient quantity to serve as a cushion between the marker and the paved surface. Any surplus adhesive shall be removed so that the visibility of the marker is not impaired. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, raised pavement markers shall be measured as individual units for each type installed, if included as a bid item in the Bid Form. Payment shall include, but not be limited to, furnishing and installing markers complete with adhesive, and shall be full compensation for all labor, materials, tools, equipment and incidentals required to complete the work. 025816 Page 2 of 2 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 DEPARTMENTAL MATERIALS SPECIFICATION PAVEMENT MARKERS(REFLECTORIZED) DMS - 4200 PAVEMENT MARKERS (REFLECTORIZED) EFFECTIVE DATE:JANUARY 2010 4200.1. Description. This Specification governs for the pre-qualification, testing, and field evaluation requirements for reflectorized pavement markers (RPMs). 4200.2. Units of Measurements. The values given in parentheses (if provided) are not standard and may not be exact mathematical conversions. Use each system of units separately. Combining values from the two systems may result in nonconformance with the standard. 4200.3. Material Producer List. The Materials and Pavements Section of the Construction Division (CST/M&P) maintains the Material Producer List(MPL) of all materials conforming to the requirements of this specification. Materials appearing on the MPL, entitled "Jiggle Bar Tiles, Pavement Markers, and Traffic Buttons,"require no further testing, unless deemed necessary by the Project Engineer or CST/M&P. 4200.4. Bidders' and Suppliers' Requirements. Before any material is allowed for use on Department projects, it must be of manufacture and product code or designation shown on the MPL. 4200.5. Pre-Qualification Procedure. The pre-qualification procedure consists of several steps, listed below, which are described in more detail in the following subsections: • Pre-qualification request, • Laboratory testing, • Field testing, • Provisional qualification, • Project evaluations, • Full qualification, • Periodic evaluation, • Disqualification, and • Re-Qualification. CST/M&P will provide notification at the completion of each step and will require confirmation from the supplier's contact person before proceeding to the next step. Costs of sampling and testing are normally borne by the Department; however, the costs to sample, test, and conduct field evaluations for materials failing to conform to the requirements of this specification are borne by the supplier. This cost will be assessed at the rate established by the Director of CST/M&P and in effect at the time of testing and will be billed directly to the Contractor or supplier. TEXAS DEPARTMENT OF TRANSPORTATION 1 -7 EFFECTIVE DATE:JANUARY 2010 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 DEPARTMENTAL MATERIALS SPECIFICATION PAVEMENT MARKERS(REFLECTORIZED) A. Pre-Qualification Request. Prospective suppliers interested in submitting their product for evaluation must submit a written request to the Texas Department of Transportation, Construction Division, Materials &Pavements Section (CP51), 125 East 11th Street, Austin, TX 78701-2483. Include the following items with the request: • Name and contact information, including email address for the person who will be the primary contact during the qualification process; • Laboratory test results, from the manufacturer's lab or an independent test laboratory, showing actual test results that meet the requirements of ASTM D 4280; • Product data sheets; • List of locations and applications dates where the product is being evaluated or is in current use; and • Test results from the National Transportation Product Evaluation Program (NTPEP), if available. B. Laboratory Testing. Provide CST/M&P with 350 RPMs of each color and type for laboratory and field testing. Submit materials for laboratory testing and field evaluations at no cost to the Department. CST/M&P will acknowledge receipt of materials and specify a tentative completion date for laboratory testing. CST/M&P will test RPMs in accordance with Article 4200.6 and will send notification of results once laboratory testing is complete. If laboratory testing conducted by TxDOT or by NTPEP shows RPMs do not meet the requirements of this specification, evaluation will cease, and RPMs will not be qualified. Suppliers may resubmit materials for qualification after providing documentation identifying the cause and corrective action taken. C. Field Testing. Upon satisfactory completion of laboratory testing, CST/M&P will specify the location of one or more roadways selected for the 12-month field test and suggested application dates. The roadways will include: • a concrete surface, • a hot-mix asphalt surface, and • a Grade 3 sealcoat. The concrete and asphalt roadways will be full-access controlled freeways with a minimum average daily traffic (ADT) count of 35,000 vehicles, a minimum of 20% average daily truck traffic volume, and a minimum posted speed limit of 65 mph. The Grade 3 road test will be conducted on a four-lane divided highway with a minimum ADT count of 4,000 vehicles per lane, a minimum of 20% average daily truck traffic volume, and a minimum posted speed limit of 50 mph. Providing NTPEP test results meeting the requirements of this specification may replace the concrete and hot-mix asphalt field tests on a deck for deck basis. If TxDOT or NTPEP field testing shows RPMs do not meet the requirements of this specification, evaluation will cease, and RPMs will not be qualified. Suppliers may TEXAS DEPARTMENT OF TRANSPORTATION 2-7 EFFECTIVE DATE:JANUARY 2010 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 DEPARTMENTAL MATERIALS SPECIFICATION PAVEMENT MARKERS(REFLECTORIZED) resubmit materials for qualification after providing documentation identifying the cause and corrective action taken. 1. NTPEP Testing. Submit NTPEP test data to CST/M&P for review if available. CST/M&P will acknowledge receipt of NTPEP data and will provide results of review within one month of receipt. The 12-month NTPEP test results for the pre-qualification of RPMs must meet the following: • all the requirements specified in ASTM D 4280 for the tests performed by NTPEP; • a retention rate equal or greater than 90 % of the placed RPMs (excluding the RPMs removed for testing); • a visual evaluation of 3 or greater, as defined by the most recent NTPEP Project Work Plan for Field Evaluations of Raised Pavement Markers and Marker Adhesives, for the marker case and marker lens for a minimum of 90 % of the placed RPMs (excluding the RPMs removed for testing); and • the minimum retroreflectivity values required after 12 months on the roadway listed in Table 1. 2. Application.Provide the name of the contractor, the traffic control plan, and the manufacturer and product code for the adhesive at least two weeks prior to the application for CST/M&P review and approval. CST/M&P will confirm the date and location of the field evaluation installation and resolve any problems as necessary. CST/M&P will provide between fifty and one hundred RPMs of each submitted type for application from the samples submitted for laboratory testing. Testing of submitted markers occurs concurrently with a set of control RPMs, for compliance with the requirements of this specification. Control markers are those RPMs currently listed on the MPL; if the MPL is reorganized and no marker exists to act as a control, an RPM that has undergone the most recent NTPEP testing on both asphalt and concrete will be used. Supplier is responsible for application of the RPMs in the presence of CST/M&P. Application must meet all Department specifications for RPM application and traffic control as well as the manufacturer's recommendations. Notify CST/M&P of any problems or concerns with the installation within one week of application and request a re-installation, if necessary. 3. Evaluation. CST/M&P will notify supplier of a suggested date for field testing evaluation at least one month prior to completion of the 12-month field trial. Provide the name of the contractor and traffic control plan for the evaluation at least 2 weeks prior to the scheduled evaluation date. Materials must meet the following requirements: a. Retention Rate. The retention rate of the test RPMs must be no less than 5%below that of the control RPMs. TEXAS DEPARTMENT OF TRANSPORTATION 3-7 EFFECTIVE DATE:JANUARY 2010 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 DEPARTMENTAL MATERIALS SPECIFICATION PAVEMENT MARKERS(REFLECTORIZED) b. Body Damage. The test RPMs must not exhibit discoloration or body damage exceeding that of the control RPMs. They must not exhibit a repetitive form of damage or mode of failure (indicative of a design flaw) in a large percentage of the test RPMs. Body damage will be visually assessed according to NTPEP criteria. c. Functionality. Four RPMs placed at 80 foot spacing or eight RPMs placed at 40 foot spacing must be functional when viewed at night from a vehicle using the low beam headlight setting. They must be functional when viewed at a minimum distance of approximately 400 ft. in the daytime. A functional marker is both visible and conspicuous. d. Retroreflectivity. CST/M&P will remove twenty test RPMs from the pavement to undergo laboratory testing for retroreflectivity in accordance with Tex-842-B. Fifteen of the twenty RPMs pulled must pass the minimum reflective values shown in Table 1 (measured at 0.2° observation angle and 0° horizontal entrance angle). Table 1 Minimum Retroreflectivity(cd/fc)After 12 Montbs on the Roadway Face 12 Mo. Crystal 1.0 Amber 0.7 Red 0.2 D. Provisional Qualification. CST/M&P will grant provisional qualification after successful completion of the laboratory and field evaluations including NTPEP testing, when applicable. CST/M&P will send notification of provisional qualification, including the date of placement on the MPL, within one month after completion of the field evaluations. Failure to complete all project evaluation requirements successfully is grounds for cancellation of provisional qualification. E. Project Evaluation. Once the material is provisionally qualified and listed on the MPL, provide CST/M&P with project information for the first three jobs supplied with the RPMs and additional projects if requested. RPMs must meet the same performance criteria as for the field evaluation to receive full qualification. CST/M&P will return the project evaluation results after the 12-month evaluation of each project. 1. Full Qualification. CST/M&P will grant full pre-qualification and continue to list materials meeting all requirements of this specification on the MPL. Pre-qualification requires extensive field evaluations. It is critical that no significant changes are made to the RPMs' composition, manufacturing process, or design during or after pre-qualification without notifying CST/M&P. It is also critical that the RPMs provided be uniform, with minimum variations from marker to marker. Significant changes not reported by the manufacturer or variations in product, as determined by the Director of CST/M&P, may be cause for removal from the MPL. TEXAS DEPARTMENT OF TRANSPORTATION 4-7 EFFECTIVE DATE:JANUARY 2010 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 DEPARTMENTAL MATERIALS SPECIFICATION PAVEMENT MARKERS(REFLECTORIZED) 2. Failure. CST/M&P will revoke provisional qualification for RPMs that do not meet the performance criteria and will remove the RPMs from the MPL. Producers not qualified under this Specification may not furnish materials for Department projects and must show evidence of correction of all deficiencies before reconsideration for qualification. F. Periodic Evaluation. Periodic evaluation consists of random department-initiated laboratory testing, audits, and periodic required submittals or field testing. 1. Department-Initiated Laboratory Testing and Audits. The Department may conduct random sampling (per Tex-729-I) and testing on pre-qualified RPMs to identify changes in the material or nonconformity in production and to perform random audits of test reports. 2. Required Submittals or Field Testing. Every 5 years, provide NTPEP data showing continued compliance with the requirements of this specification. G. Disqualification. Causes for disqualification and removal from the MPL include, but are not limited to, the following: • material fails to meet the requirements stated in this specification; • the producer fails to report changes in the composition, manufacturing process, or design to CST/M&P; • the producer has unpaid charges for failing samples; or • qualified RPMs demonstrate repeated and large-scale performance problems in the field. H. Re-Qualification. Suppliers disqualified and removed from the MPL may submit materials for requalification after submitting documentation identifying the cause of the problem and corrective action taken. 4200.6. Material Requirements. All RPMs must meet all requirements, except for requirements specified for a specific type. A. Reflectorized Types. • Type I-A must contain one face that reflects amber light. The body, other than the reflective face, must be yellow. • Type I-C must contain one face that reflects white light. The body, other than the reflective face, must be white or silver-white. • Type I-R must contain one face that reflects red light. The body, other than the reflective face, must be white or silver-white. • Type II-A-A must contain two reflective faces oriented 180° to each other, each of which must reflect amber light. The body, other than the reflective faces, must be yellow. TEXAS DEPARTMENT OF TRANSPORTATION 5-7 EFFECTIVE DATE:JANUARY 2010 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 DEPARTMENTAL MATERIALS SPECIFICATION PAVEMENT MARKERS(REFLECTORIZED) • Type II-C-R must contain two reflective faces oriented 180° to each other, one of which must reflect white light and one of which must reflect red light. The body, other than the reflective faces, must be white or silver-white. B. Appearance Requirements. The outer surface of the RPMs must be smooth except for the molding or stamping of the manufacturer's unique imprint. All corners and edges exposed to traffic must be rounded. C. Optical Requirements. The RPMs must be capable of providing amber, red, or white light reflection as required by the requisition or plans. The reflected light of each reflective face must conform to the minimum reflective specific intensity (SI)requirements listed in Table 2, measured in candelas per foot-candle (cd/fc). Table 2 Minimum SI per Reflective Face at 0.21 Observation Angle(cd/fc) Horizontal Entrance Angle Crystal Amber Red 00 3.00 2.00 0.75 200 1.50 1.00 0.30 D. Physical Requirements. When tested in accordance with Tex-434-A, the minimum strength of five markers must be 2,000 lb. with none exhibiting a deformation of more than 0.125 in. before achieving the minimum strength. A random sample of five markers will be tested in accordance with Tex-434-A. The average compression results must have a quality index value equal to or greater than 1.23. The quality index value will be calculated from the lower specification limit of 2,000 lb. load. The following equation is used to determine the quality index value: QL = (X — LSL) / s Where: QL = quality index value X= average result from test LSL = lower specification limit s = standard deviation from test. E. Heat Resistance. The RPMs must show no change in physical or optical properties when subjected to the requirements of Tex-846-13. The temperature will be 140°F with the marker in a vertical position. The SI of the pavement marker must not be less than 80% of its initial value after being subjected to the heat test. TEXAS DEPARTMENT OF TRANSPORTATION 6-7 EFFECTIVE DATE:JANUARY 2010 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 DEPARTMENTAL MATERIALS SPECIFICATION PAVEMENT MARKERS(REFLECTORIZED) F. Impact Test. The RPMs will be impact tested during the pre-qualification process. They will be impacted with a 20-1b. weight in the form of a 2-in. solid right-circular cylinder with a flat impact face having rounded edges falling freely through a vertical guide. The RPMs will be impacted while resting on a solid, flat, steel plate that is at least 1/2 in. thick. The RPMs will be tested at increasing heights until failure occurs. Failure will occur when the lens or body cracks. The height at which failure occurs -6 in. will be the acceptance threshold for RPMs supplied after pre-qualification. 4200.7. Archived Versions. Archived versions are available. TEXAS DEPARTMENT OF TRANSPORTATION 7-7 EFFECTIVE DATE:JANUARY 2010 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 DEPARTMENTAL MATERIALS SPECIFICATION BITumNOIIS ADHESIVE FOR PAVEMENT MARKERS DMS - 6130 BITUMINOUS ADHESIVE FOR PAVEMENT MARKERS EFFECTIVE DATE:JANUARY 2008 6130.1. Description. This Specification establishes the requirements for bituminous type hot- melt adhesive used for the placement of pavement markers. Two types are addressed: standard bituminous marker adhesive consisting of an asphalt base with homogeneously mixed mineral filler; and flexible bituminous marker adhesive consisting of a highly polymer modified asphalt. Either adhesive must be suitable for bonding ceramic and plastic markers to hydraulic cement concrete, asphaltic concrete, and chip-sealed road surfaces and be applicable when road surface and marker temperatures are in the approximate range of 4-71°C (40-160°F). The composition of the adhesive must be such that its properties will not deteriorate when heated to and applied at temperatures up to 218°C (425°F)using either air or oil jacketed melters. 6130.2. Units of Measurements. The values given in parentheses (if provided) are not standard and may not be exact mathematical conversions. Use each system of units separately. Combining values from the two systems may result in nonconformance with the standard. 6130.3. Material Requirements. A. Adhesive Properties. The adhesive must be smooth and homogeneous, containing no visible particles, and must comply with the requirements in Table 1. Table 1 Adhesive Properties Material Standard Adhesive Flexible Adhesive Property Test Method min max min max Softening Point,°F ASTM D 36 200 200 Penetration, 100 g,5 s,25°C(77F),0.1 mm ASTM D 5 10 20 15 254 Flow,5 hr.,70°C(158°F),mm 5 54 Heat Stability Flow,5 hr.,70°C(158°F),mm 5 5 Viscosity, 10 rpm,204°C(400°F),Pa-s 7.5 7.5 Flash Point,C.O.C.,OF ASTM D 92 550 550 Ductility,5 cm/min,77°F,cm AASHTO T 51 - 15 - Flexibility, 1 in.mandrel,900 bend, 10 s ASTM D 3111 pass 1.Exception to ASTM D 5329;heat the sample as described in ASTM D 5,Section 7.1. 2.Exception to ASTM D 5329;condition the sample as described in"Test Methods." 3.As modified in"Test Methods" 4.Maximum penetration of 30 is allowed provided the result of the flow test is less than 1 mm. TEXAS DEPARTMENT OF TRANSPORTATION 1 -3 LAST REVIEWED:SEPTEMBER 2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 DEPARTMENTAL MATERIALS SPECIFICATION BITumNousADHESIVE FOR PAVEMENT MARKERS B. Asphalt Properties. This applies to standard bituminous adhesive only. The filler-free asphalt, obtained from the Extraction and Abson recovery process, as explained in Section 6130.4, must have the properties in Table 2. Table 2 Filler-Free Asphalt Properties Property Minimum Maximum Test Method Penetration, 100 g,5 s,25°C,(77°F), 25 ASTM D 5 0.1 mm(in.) Viscosity, 135°C(275°F)Pa-s 1.2(12) ASTM D 2171 (Poises) Viscosity Ratio, 135°C(275°F) 2.2 ASTM D 1754 and ASTM D 2171 C. Filler Properties. This applies to standard bituminous adhesive only. The filler material, obtained using the filler separation technique described in Section 6130.4, must have the properties in Table 3. Table 3 Filler Properties Property Minimum Maximum Test Method Filler Content,wt.% 50 75 As in Section 6130.4. Filler Fineness,%passing: ASTM C 430,as modified in 45 µm o.325) 75 -- Section 6130.4. 75 µm(No.200) 95 100 -- 150 µm(No. 100) 6130.4. Test Methods. A. Heat Stability Flow. To determine the heat stability flow,place 1000 g of adhesive in a loosely-covered quart can, heat to 218°C (425°F) and maintain at this temperature 4 hours before performing the flow test. B. Extraction and Abson Recovery.Use this procedure to separate and recover the base asphalt from the adhesive. Heat the adhesive just to the point where it will easily flow. Transfer between 125 and 150 g into a 1000-mL (1-qt.) Erlenmeyer flask containing 400 mL (13.5 fl. oz.) of trichloroethylene with a temperature of 52-66°C (125-150°F). Stir this mixture thoroughly to dissolve the asphalt. Decant the solvent-asphalt mixture. Recover the base asphalt from solvent according to Tex-211-F, but begin with the centrifuge step; the primary distillation is not necessary. Repeat the above extraction- recovery method as necessary to obtain the desired quantity of asphalt. C. Filler Separation Technique.Use this procedure to separate the filler material from the asphalt and determine the filler content of the adhesive. Weigh 10.00 ± 0.01 g of solid adhesive, broken into small pieces, into a centrifuge flask with approximately 100 mL (3.5 fl. oz.)volume such as that specified in ASTM D 1796. Add 50 mL (1.7 fl. oz.) of trichloroethylene to the adhesive. Swirl or stir the mixture with a fine rod, taking care not TEXAS DEPARTMENT OF TRANSPORTATION 2-3 LAST REVIEWED:SEPTEMBER 2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 DEPARTMENTAL MATERIALS SPECIFICATION BITumNousADHESIVE FOR PAVEMENT MARKERS to lose any solids. Place the sample flask in a balanced centrifuge and spin using a minimum relative centrifugal force of 150 (as determined in ASTM D 1796, Section 6.) Remove the sample flask and decant the solvent, taking care not to lose any solids. Repeatedly add more solvent, centrifuge, and decant until the solvent becomes clear and the filler appears free of asphalt. Dry the recovered filler at 71 ± 3°C (160 ± 5°F)to remove solvent. Weigh the dried filler. Filter the decanted solvent through a filter paper with a 20-25 gm retention factor to verify there is no loss of filler. Calculate the filler content as a percentage of the original sample weight. D. Filler Fineness.Use this procedure to determine the filler fineness. Use the same apparatus as described in ASTM C 430, except also use 75µm (No. 200) and 150 gm (No. 100) sieves. Prepare a water solution containing 1 wt. percent of a nonionic, water- soluble surfactant, such as Triton X-100, beforehand. Thoroughly wet the 1 g dry sample in the surfactant solution and allow it to soak for 30 min. Transfer the filler completely into the 45 gm (No. 325) sieve cup. Wash the sample with the water spray, as described in ASTM C 430, Section 5, for 2 min., adding surfactant solution as needed to disperse any clumped particles. Dry and weigh the sample and perform calculations as directed in ASTM C 430. Repeat the procedure using the other two sieve sizes. 6130.5. Acceptance. Bituminous adhesives are pre-qualified in accordance with Tex-538-C. Consult`Bituminous Marker Adhesive" for a list of materials currently pre-qualified under this procedure. 6130.6. Packaging and Labeling. Package the adhesive in self-releasing cardboard containers with essentially flat and parallel top and bottom surfaces such that the packages will stack properly. Each package must have a net weight of either 23 or 27 kg (50 or 60 lb.) and must weigh within 1 kg (2 lb.) of the stated quantity. Self-releasing cardboard dividers, which will separate each package into sections weighing no more than 7 kg (15 lb.) each, must be part of the packaging. Each package must display: • the manufacturer's name, • net weight, • lot or batch number, and • a product name that clearly identifies the material as either standard or flexible bituminous marker adhesive. 6130.7. Archived Versions. Archived versions are available. TEXAS DEPARTMENT OF TRANSPORTATION 3-3 LAST REVIEWED:SEPTEMBER 2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 027202 MANHOLES 1. DESCRIPTION This specification shall govern the furnishing of all materials and construction of manholes composed of a concrete base and concrete walls as shown on the drawings,to the lines, grades and dimensions shown on drawings or established by the Engineer. 2. MATERIALS Concrete for cast-in-place storm water manholes and storm water junction boxes shall be Class C (3,600 psi at 28 days). Manholes for wastewater shall be made from fiberglass only, in accordance with City Standard Specification Section 027205 "Fiberglass Manholes". Mortar for plastering shall be one (1)part Portland cement to three (3) parts clean hard and sharp mortar sand, free of all foreign substances or injurious alkalis. Reinforcing steel, where used, shall conform to the requirements of Section 032020 "Reinforcing Steel". All wastewater manhole rings and covers for streets shall be East Jordan Iron Works, Inc. product V1430 CV or V1420/1480 Z1, or pre-approved equal, and shall have the seating surface of ring and cover machined to secure a snug fit per the City Standard Wastewater Details. All storm water manholes shall be East Jordan Iron Works,Inc.product V 1168 assembly,and for school zones shall be a bolted assembly per the City Standard Storm Water Details. Steps are not required for wastewater and storm water manholes. Joint material for precast concrete manholes shall be Ram-Nek Flexible Plastic Gaskets as manufactured by K. T. Snyder Company, Houston, Texas, or an approved equal. 3. EXCAVATION The Contractor shall do all necessary excavation for the various manholes, conforming to size and dimensions shown on plans plus a maximum of four(4)feet working room. Excavation shall not be carried to greater depth than required. Subgrade under manhole footings shall be compacted to not less than 95% Standard Proctor density. Shoring shall be the responsibility of the Contractor and shall be installed as necessary. Shoring shall not be removed or backfilled around until entire manhole is completed, unless authorized by the Engineer. Shoring shall remain in place at least twenty-four(24) hours after concrete work has been completed. 027202 Page 1 of 3 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 4. CONCRETE MANHOLES (STORM WATER ONLY) (1) Formed-in-Place Manholes: Where formed concrete is used, forms shall be built to dimensions shown on the standard details. Inserts and openings shall be formed so concrete will not be injured during process of stripping forms. Forms shall be braced and tied to prevent spreading or bulging, and shall meet approval of the Engineer prior to placing concrete. Forms shall remain in place for minimum of twenty-four(24) hours, and shall be removed within a maximum time of seven (7) days after completion of concrete work. Reinforcing steel, if required, shall be as shown on the plans. The bottom of manholes shall be carefully formed and inverted smoothly when finished, with pipes cut to fit inside surface of walls. (2) Precast Manholes Precast manholes shall allow unobstructed view of all pipes connected to the manhole. Precast manholes shall be designed to support HS-20 traffic loading and designed by a Texas licensed professional engineer. The upper 18 inches of the corbel shall be brick to facilitate subsequent grade adjustment. Either concentric or eccentric cones may be required. Where not specified,eccentric cones shall be used. Manhole designs shall be submitted for approval by the Engineer. 5. GENERAL CONSTRUCTION METHODS All items shall be installed as the work progresses and as shown on the standard details. Work shall be completed and finished in a careful workmanlike manner,with special care being given to sealing joints around all pipe extending through walls of the manholes. After finishing walls,the bottom of the manhole shall be completed by adding sufficient concrete to shape the bottom in conformity with requirements on the plans. Where old manholes are adjusted to meet new lines and grades, all old masonry or concrete shall be thoroughly cleaned and wetted before j oining new masonry or concrete to it. HDPE adjustment rings are to be used to match roadway grade. A maximum of 18" of adjustment rings may be utilized. 6. BACKFILLING/LEAKAGE TESTING Backfilling around the manholes shall commence as soon as concrete or masonry has been allowed to cure the required time and forms and shoring have been removed. Backfill shall be placed in layers of not more than six inches (6") and compacted to a minimum of 95% Standard Proctor density before next layer is installed. Wastewater manholes shall withstand a leakage test not to exceed the values stated in City Standard Specification Section 027205 "Fiberglass Manholes", except that an additional 10 percent of loss will be permitted for each additional two feet head over a basic two-foot internal head. 027202 Page 2 of 3 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 7. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, manholes shall be measured by each individual structure built, and paid for at the unit price bid per each, of the size, type and depth specified, complete in-place, and meeting the approval of the Engineer. "Complete in-place" shall mean all labor, materials, tools, equipment and incidentals necessary to furnish and install the manholes, excavation,compaction,backfilling,dewatering,concrete foundation,connections,adjustment rings, ring and cover, concrete work, leakage testing,video inspection, and adjust the manholes to finish grade. Extra depth for wastewater manholes over six feet in depth shall be measured by the vertical foot and shall be paid for at the price bid per vertical foot for "Extra Depth for Manholes". Rehabilitation of existing manholes with fiberglass inserts shall be measured by each individual structure rehabilitated, and paid for at the unit price bid per each, of the size, type and depth specified, complete in-place, and meeting the approval of the Engineer. "Complete in-place" shall mean all labor, materials,tools, equipment and incidentals necessary to furnish and install the rigid fiberglass manhole inserts,make connections,grout the annular space,backfilling,adjustment rings, ring and cover, concrete work, leakage testing, and adjust the manholes to finish grade. 027202 Page 3 of 3 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 027203 VACUUM TESTING OF WASTEWATER MANHOLES AND STRUCTURES 1. DESCRIPTION This specification governs all work and materials necessary to perform vacuum testing of new or existing wastewater manholes. Manholes may be tested after installation with all connections (existing and/or proposed)in place. Vacuum testing may be performed prior to or after backfilling by the installer. Final acceptance, in accordance with the requirements of this specification, will consist of vacuum testing of the completed and installed structure (manhole) in place to include manhole/adjustment rings and manhole casting. 2. MATERIALS Vacuum testing shall consist of a minimum of the following: (a) Engine. (b) Vacuum Pump. (c) Hose. (d) Test Head device capable of sealing opening in manhole casting as required. (e) Pneumatic Test Plugs - these plugs shall have a sealing length equal to or greater than the diameter of the connecting pipe to be sealed. 3. PROCEDURE (a) The test head shall be placed at the top of the manhole in accordance with the manufacturer's recommendations. (b) A vacuum of 10 inches of mercury shall be drawn on the manhole,the valve on the vacuum line of the test head closed, and the vacuum pump shut off. The time shall be measured for the vacuum to drop to 9 inches of mercury. (c) The manhole shall pass if the time for the vacuum reading to drop from 10 inches of mercury to 9 inches of mercury meets or exceeds the values indicated in Table 1. (d) If the manhole fails the initial test,necessary repairs shall be made by an approved method. The manhole shall then be retested until a satisfactory test is obtained. 027203 Page 1 of 2 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 TABLE 1 -Minimum Test Times for Various Manhole Diameters (ASTM C1244) Depth Diameter(inches) (feet) 42 48 54 60 72 Time(seconds) 8 17 20 23 26 33 10 21 25 29 33 41 12 25 30 35 39 49 14 30 35 41 46 57 16 34 40 46 52 67 18 38 45 52 59 73 20 42 50 53 65 81 22 46 55 64 72 89 24 51 59 64 78 97 26 55 64 75 85 105 28 59 69 81 91 113 30 68 74 87 98 121 4. TESTING AND CERTIFICATION (a) Testing shall be done by the Contractor and witnessed by the Engineer or his designated representative. All manholes and structures shall be tested as finished and completed for final acceptance. (b) ANY DEFECTIVE WORK OR MATERIALS shall be corrected or replaced by the Contractor and retested. This shall be repeated until all work and materials are acceptable. 5. MEASUREMENT AND PAYMENT Unless otherwise indicated on the Bid Form, vacuum testing of wastewater manholes and structures will not be measured for pay. Such items shall be considered subsidiary to pay items applicable for Fiberglass Manholes, complete and in-place. 027203 Page 2 of 2 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 027402 REINFORCED CONCRETE PIPE CULVERTS 1. DESCRIPTION This specification shall govern the furnishing and placing of reinforced concrete pipe culverts and the material and incidental construction requirements for reinforced concrete pipe sewers. The culvert pipe shall be installed in accordance with the requirements of these specifications to the lines and grades shown on the plans, and shall be of the classes, sizes and dimensions shown thereon. The installation of pipe shall include all joints or connections to new or existing pipe, headwalls, etc., as may be required to complete the work. 2. MATERIALS 1. General. Except as modified herein, materials, manufacture and design of pipe shall conform to ASTM C-76 for Circular Pipe. All pipe shall be machine made or cast by a process which will provide for uniform placement of the concrete in the form and compaction by mechanical devices which will assure a dense concrete. Concrete shall be mixed in a central batch plant or other approved batching facility from which the quality and uniformity of the concrete can be assured. Transit mixed concrete will not be acceptable for use in precast concrete pipe. 2. Design. All pipe shall be Class III (Wall "B") unless otherwise specified on the plans. The shell thickness, the amount of circumferential reinforcement and the strength of the pipe shall conform to the specified class as summarized in ASTM C-76 for Circular Pipe. 3. Sizes and Permissible Variations. a. Variations in diameter, size, shape, wall thickness, reinforcement, placement of reinforcement, laying length and the permissible underrun of length shall be in accordance with the applicable ASTM Specification for each type of pipe as referred to previously. b. Where rubber gasket pipe joints are to be used, the design of the Joints and Permissible Variations in Dimensions shall be in accordance with ASTM C-443. 4. Workmanship and Finish. Pipe shall be substantially free from fractures, large or deep cracks and surface roughness. The ends of the pipe shall be normal to the walls and centerline of the pipe within the limits of variations allowed under the applicable ASTM specification. 5. Curing. Pipe shall be cured in accordance with the applicable ASTM Specification for each type of pipe as referred to above. 6. Marking. The following information shall be clearly marked on each section of pipe: 027402 Page 1 of 7 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 a. The class of pipe. b. The date of manufacture. c. The name or trademark of the manufacturer. d. Marking shall be indented on the pipe section or painted thereon with waterproof paint. 7. Minimum Age for Shipment. Pipe shall be considered ready for shipment when it conforms to the requirements of the tests specified herein. 8. Inspection. The quality of materials, the process of manufacture, and the finished pipe shall be subject to inspection and approval by the Engineer at the pipe manufacturing plant. In addition, the finished pipe shall be subject to further inspection by the Engineer at the project site prior to and during installation. 9. Causes for Rejection. Pipe shall be subject to rejection on account of failure to conform to any of the specification requirements. Individual sections of pipe may be rejected because of any of the following: a. Fractures or cracks passing through the shell, except for a single end crack that does not exceed the depth of the joint. b. Defects that indicate imperfect proportioning, mixing and molding. c. Surface defects indicating honeycombed or open texture. d. Damaged ends,where such damage would prevent making a satisfactory joint. 10. Repairs. Pipe may be repaired if necessary, because of occasional imperfections in manufacture or accidental injury during the handling, and will be acceptable if, in the opinion of the Engineer, the repairs are sound and properly finished and cured and the repaired pipe conforms to the requirements of the specifications. 11. Rejections. All rejected pipe shall be plainly marked by the Engineer and shall be replaced by the Contractor with pipe that meets the requirements of these specifications. Such rejected pipe shall be removed immediately from the worksite. 12. Jointing Materials. Unless otherwise specified on the plans, the Contractor shall have the option of making the joints by any of the following methods: a. Ram-Nek, a pre-formed plastic base joint material manufactured by K. T. Knyder Company, Houston, Texas, or an approved equal. Use of Talcote as joint material will not be not permitted. Ram-Nek joint material and primer shall be supplied for 027402 Page 2 of 7 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 use on pipe in the following sizes, which is the minimum that will be required. Additional Ram-Nek may be required if, in the opinion of the Engineer, a proper joint is not secured. Pipe Size Primer Per 100 Jts. Cut Lengths Per Joint 12" 1.5 gals. 11/2 pcs 1" x 2'-5" 15" 1.9 gals. 2 pcs 1" x2'-5" 18" 2.7 gals. 11/2 pcs 11/2 " x 3'-5" 21" 3.8 gals. 2 pcs 1�/z "x 3'-5" 24" 6.2 gals. 2 pcs 11/2 "x 3'-5" 30" 8.5 gals. 21/2 pcs 11/2" x 3'-5" 36" 9.5 gals. 3 pcs 13/4" x 3'-5" 42" 12.0 gals. 31/2 pcs 13/4"x 3'-5" 48" 15.0 gals. 4 pcs 13/4" x 3'-5" 54" 20.0 gals. 41/2 pcs 13/4"x 3'-5" 60" 25.0 gals. 5 pcs 13/4" x 3'-5" 66" 30.0 gals. 51/2 pcs 13/4"x 3'-5" 72" 32.0 gals. 6 pcs 2" x 3'-5" 84" 35.0 gals. 7 pcs 2"x 3'-5" b. TYLOX Types "C", "C-P" or "CR" rubber gaskets, as applicable, as manufactured by Hamilton Kent Manufacturing Company, Kent, Ohio, or approved equal. All gaskets, lubricants, adhesives, etc., shall be manufactured, constructed, installed, etc., as recommended by the manufacturer of the rubber gasket material and conform to ASTM Designation: C-443. In addition, the Contractor shall furnish to the City, for approval, manufacturer's brochures detailing the complete use, installation, and specifications of concrete pipe and rubber gaskets before any rubber gasket material is used on the project. All rubber gaskets shall be fabricated from synthetic rubber. c. Cement Mortar is prohibited from jointing pipe except at manholes, pipe junctions, etc., or where specifically approved by the Engineer. d. Geotextile for wrapping pipe joints shall be Class "A" subsurface drainage type in accordance with AASHTO M288. 027402 Page 3 of 7 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 3. CONSTRUCTION METHODS Reinforced concrete pipe culverts shall be constructed from the specified materials in accordance with the following methods and procedures: 1. Excavation. All excavation shall be in accordance with the requirements of City Standard Specification Section 022020 "Excavation and Backfill for Utilities," except where tunneling or jacking methods are shown on the plans or permitted by the Engineer. When pipe is laid in a trench, the trench, when completed and shaped to receive the pipe, shall be of sufficient width to provide free working space for satisfactory bedding and jointing and thorough tamping of the backfill and bedding material under and around the pipe. The Contractor shall make such temporary provisions as may be necessary to insure adequate drainage of the trench and bedding during the construction operation. Pipe shall be placed such that the identification markings are visible at the top prior to backfill. 2. Beddin;. The pipe shall be bedded in accordance with the bedding details shown on the drawings. Bedding shall not be measured for pay,but shall be subsidiary to other work. If the subgrade of the trench is unstable, even if this condition occurs at relatively shallow depths, full encasement of the pipe with crushed stone shall be required. 3. Laying Pipe. Unless otherwise authorized by the Engineer, the laying of pipe on the prepared foundation shall be started at the outlet (downstream) end with the spigot or tongue end pointing downstream, and shall proceed toward the inlet(upstream) end with the abutting sections properly matched, true to the established lines and grades. Where bell and spigot pipe are used, cross trenches shall be cut in the foundation to allow the barrel of the pipe to rest firmly upon the prepared bed. These cross trenches shall be not more than two inches larger than the bell ends of the pipe. Proper facilities shall be provided for hoisting and lowering the sections of pipe into the trench without disturbing the prepared foundation and the sides of the trench. The ends of the pipe shall be carefully cleaned before the pipe is placed. As each length of pipe is laid, the mouth of the pipe shall be protected to prevent the entrance of earth or bedding material. The pipe shall be fitted and matched so that when laid in the bed, it shall form a smooth, uniform conduit. When elliptical pipe with circular reinforcing or circular pipe with elliptical reinforcing is used, the pipe shall be laid in the trench in such position that the markings "TOP" or "BOTTOM" shall not be more than 5 degrees from the vertical plane through the longitudinal axis of the pipe. For pipe over 42 inches in diameter, the Contractor may drill two holes not larger than 2 inches in diameter, in the top of each section of the pipe,to aid in lifting and placing. The holes shall be neatly drilled, without spalling of the concrete, and shall be done without the cutting of any reinforcement. After the pipe is laid, the holes shall be filled with mortar and properly cured, and placed such that they are visible from the top for inspection prior to backfill. Multiple installations of reinforced concrete pipe shall be laid with the center lines of 027402 Page 4 of 7 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 individual barrels parallel. When not otherwise indicated on plans, the following clear distances between outer surfaces of adjacent pipe shall be used. Diameter of Pipe 18" 24" 30" 36" 42" 48" 54" 60"to 84" Clear Distance Between Pipes 0'-9" 0'-11 " 1'-1" 1'-3" 1'-5" 1'-7" 1'-1111 2'-0" 4. Jointing. a. If the use of Portland cement mortar joints is allowed, all pipe shall be jointed tight and sealed with stiff mortar, composed of one part Portland cement and two parts sand, so placed as to form a durable water-tight joint. The installation shall be as required by the Engineer. b. Joints using Rubber Gaskets: Where rubber gasket pipe joints are required by the plans, the joint assembly shall be made according to the recommendations of the gasket manufacturer. Water-tight joints will be required when using rubber gaskets. c. Joints using Cold-Applied Preformed Plastic Gaskets shall be made as follows: A suitable prime of the type recommended by the manufacturer of the gasket joint sealer shall be brush-applied to the tongue and groove joint surfaces and the end surfaces and allowed to dry and harden. No primer shall be applied over mud, sand or dirt or sharp cement protrusions. The surface to be primed must be clean and dry when primer is applied. Before laying the pipe in the trench, the plastic gasket sealer shall be attached around the tapered tongue or tapered groove near the shoulder or hub of each pipe joint. The paper wrapper shall be removed from one side only of the two-piece wrapper on the gasket and pressed firmly to the clean, dry pipe joint surface. The outside wrapper shall not be removed until immediately before pushing the pipe into its final position. When the tongue is correctly aligned with the flare of the groove, the outside wrapper on the gasket shall be removed and the pipe shall be pulled or pushed home with sufficient force and power(backhoe shovel, chain hoist, ratchet hoist or winch) to cause the evidence of squeeze-out of the gasket material on the inside or outside around the complete pipe joint circumference. The extruded gasket material shall be smoothed out over the joint on the exterior and interior of the pipe. Any joint material pushed out into the interior of the pipe that would tend to obstruct the flow shall be removed. (Pipe shall be pulled home in a straight line with all parts of the pipe on line and grade at all times.) Backfilling of pipe laid with plastic gasket joints may proceed as soon as the joint has been inspected and approved by the Engineer. Special precautions shall be taken in placing and compacting backfill to 027402 Page 5 of 7 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 avoid damage to the joints. When the atmospheric temperature is below 60 degrees F, plastic joint seal gaskets shall either be stored in an area warmed to above 70 degrees F, or artificially warmed to this temperature in a manner satisfactory to the Engineer. Gaskets shall then be applied to pipe joints immediately prior to placing pipe in the trench, followed by connection to previously laid pipe. d. Pipe Joints for storm sewers shall be wrapped with geotextile material. The geotextile wrap shall be at least 2 feet wide and shall be centered on each joint. 5. After the pipe has been placed, bedded and jointed as specified, filling and/or backfilling shall be done in accordance with the applicable requirements of City Standard Specification Section 022020 "Excavation and Backfill for Utilities." If unstable conditions are encountered, fully encase the pipe with crushed stone as described above. When mortar joints are allowed, no fill or backfill shall be placed until the jointing material has been cured for at least six (6)hours. Special precautions shall be taken in placing and compacting the backfill to avoid any movement of the pipe or damage to the joints. For side drain culverts and all other culverts where joints consist of materials other than mortar, immediate backfilling will be permitted. 6. Unless otherwise shown on the plans or permitted in writing by the Engineer, no heavy earth moving equipment will be permitted to haul over the structure until a minimum of 4 feet of permanent or temporary compacted fill has been placed thereon. Pipe damaged by the Contractor's equipment shall be removed and replaced by the Contractor at no additional cost. 7. Cleaning and Television Inspection. All enclosed reinforced concrete pipe and manholes installed on this project shall be cleaned and televised in accordance with City Standard Specification Section 027611 "Cleaning and Televised Inspection of Conduits." 4. MEASUREMENT Unless otherwise specified on the Bid Form, reinforced concrete pipe will be measured by the linear foot. Such measurement will be made between the ends of the pipe barrel along its central axis. Where spurs or branches, or connections to existing pipe lines are involved, measurement of the spur or new connecting pipe will be made from the intersection of its center axis with the outside surfaces of the pipe into which it connects. Where inlets, headwalls, catch basins, manholes,junction chambers, or other structures are included in lines of pipe, that length of pipe tying into the structure wall will be included for measurement but no other portion of the structure length or width will be so included. For multiple pipes, the measured length will be the sum of the lengths of the barrels measured as prescribed above. 027402 Page 6 of 7 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 5. PAYMENT Payment for reinforced concrete pipe measured as prescribed above will be made at the contract unit price bid per linear foot for the various sizes of "Reinforced Concrete Pipe" of the class specified. Payment shall be full compensation for furnishing and transporting the pipe; hauling and placing of earth cushion material where required for bedding pipe; for the preparation and shaping of beds; for hauling, placing and jointing of pipes; for furnishing and installing geotextile pipe joint wrapping; for end finish; for all connections to existing and new structures; for cleaning and television inspection; and for all other items of materials, labor, equipment, tools, excavation, backfill and incidentals necessary to complete the culvert or storm sewer in accordance with the plans and these specifications. 027402 Page 7 of 7 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 027404 CONCRETE BOX CULVERTS 1. DESCRIPTION This specification shall govern all work required for constructing, furnishing, and installing reinforced concrete box culverts required to complete the project. All reinforced concrete boxes for this project shall be precast concrete in accordance with TxDOT Standards for precast box culverts and the details shown on the drawings for the appropriate height of fill, and design shall conform to ASTM C1577. Alternate designs of precast boxes will be considered for approval upon submission of shop drawings detailing the box and certifications that the box,as designed,is structurally comparable to or better than the box shown in the contract drawings and is designed to support HS20 loading per ASSHTO M273. The shop drawings and certifications shall be signed and sealed by a Texas registered professional engineer. 2. MATERIALS 1. Concrete. Unless otherwise shown on the plans,Class"C"concrete shall be used for cast-in- place boxes,conforming to the requirements of City Standard Specification Section 030020 "Portland Cement Concrete" and City Standard Specification Section 038000 "Concrete Structures",except that Class"S"concrete will be required for top slabs of direct traffic cast- in-place boxes. Concrete for precast (machine-made) boxes shall meet the requirements of ASTM C76 Sections: "Cement", "Aggregates" and "Mixture", and shall have a minimum 28-day compressive strength of 5,000 psi. 2. Reinforcement. Reinforcing steel shall conform to the requirements of City Standard Specification Section 032020 "Reinforcing Steel" and the details shown on the plans. 3. Jointing. Materials for jointing shall conform to the requirements of City Standard Specification Section 027402 "Reinforced Concrete Pipe Culverts". 4. Membrane Curing. Materials for membrane curing shall conform to City Standard Specification Section 038000 "Concrete Structures". 5. Geotextile. Geotextile fabric for wrapping joints shall be Class 1 geotextile for subsurface drainage with an average opening size(AOS)of 0.22mm and in accordance with AASHTO M288. 3. FABRICATION The requirement of City Standard Specification Section 030020 "Portland Cement Concrete" and City Standard Specification Section 038000"Concrete for Structures"shall govern for cast-in-place concrete box culverts and for precast(formed)boxes except where otherwise specified herein. 027404 Page 1 of 3 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Forms for precast(machine-made)boxes shall be made of steel. Forms for cast-in-place boxes and precast(formed)boxes may be either wood or steel. Forms shall be mortar-tight and of sufficient strength to prevent excessive bulging or misalignment of adjacent boxes. They shall be constructed to permit their removal without damage to the concrete. Offsets at form joints shall not exceed one-eighth inch (1/8"). Forms shall be clean and free of extraneous matter when concrete is placed. Positive means of supporting steel cages in place throughout forming and concrete placement shall be required and subject to the approval of the Engineer. Welding of reinforcing steel will be permitted only where shown on the plans. Welding shall be done by a qualified welder and shall conform to industry standards. Precast(machine-made)boxes shall be cast by a process which will provide for uniform placement of the concrete in the forms and compaction by mechanical devices which will assure dense concrete. Concrete shall be mixed in a central batch plant or other approved batching facility from which the quality and uniformity of the concrete can be assured. Transit mixed concrete shall not be acceptable for use in precast(machine-made)boxes. 4. TESTING AND CERTIFICATION 1. Physical Requirements. Precast boxes shall meet the requirement of ASTM C 1577. Testing shall be done by a materials engineering testing laboratory which meets the requirements for membership in the American Council of Independent Laboratories. 2. Fabrication Tolerances. Precast boxes shall conform to the following tolerances: When two box sections are fitted together on a flat surface, in proper alignment and in the position they will be installed, the longitudinal opening at any point shall not exceed one inch (1"). Not more than four lifting holes may be provided in each box to facilitate handling. They may be cast-in,cut into the fresh concrete after form removal or drilled, and shall not be more than 2 inches in diameter or 2 inches square. Cutting or displacement of the reinforcement will not be permitted. Spalled areas around the holes shall be repaired. Concrete boxes shall be given an "Ordinary Surface Finish" in accordance with Section 038000 "Concrete Structures". 3. Certification. Certification of quality shall be provided with each delivery of materials to the job site by the manufacturer. Certification shall be a written report by the materials engineering testing laboratory. 5. DEFECTS AND REPAIRS Fine cracks or checks on the surface of the member which do not extend to the plane of the nearest reinforcement will not because for rejection unless they are numerous and extensive. Cracks which extend into the plane of the reinforcing steel but are acceptable otherwise, shall be repaired in an approved manner. 027404 Page 2 of 3 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Small damaged or honeycombed areas which are purely surficial in nature may be repaired. Excessive damage,honeycombing or cracking will be subject to structural review. Repairs shall be sound, properly finished, and cured in conformance with the pertinent specifications. When fine cracks or hairline cracks on the surface indicate poor curing practices,further production of precast boxes shall be discontinued until corrections are made and proper curing provided. 6. CONSTRUCTION METHODS Excavation and backfill shall be in accordance with City Standard Specification Section 022020 "Excavation and Backfill for Utilities" and City Standard Details for Stormwater. Bedding for precast concrete box culverts located under pavements shall consist of 6 inches of cement-stabilized sand containing a minimum of 11/2 sacks of Standard Type I or Type II Portland cement per cubic yard of sand and compacted to not less than 95% Standard Proctor density. Unless otherwise shown on the plans,the Contractor may use any of the jointing materials, except rubber gaskets, and shall comply with the jointing requirements specified in the City Standard Specification Section 027402 "Reinforced Concrete Pipe Culverts". All box joints shall be wrapped with geotextile fabric. The wrap shall beat least two(2)feet wide and centered on the joints. Lifting holes shall be filled with mortar or concrete and cured to the satisfaction of the Engineer. 7. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, concrete box culverts shall be measured by the linear foot for each size of box installed. The measurement will be made between the ends of the box along the centerline. For boxes used in the multiple barrel structures,the measured length will be the sum of the lengths of all barrels. Payment shall be made at the contract bid price and shall fully compensate the Contractor for furnishing, transporting and installing the box culverts; for bedding materials and bed preparation including compaction; for excavation and backfill of trenches; for all connections to existing and new structures;and for all labor,materials,tools,equipment and incidentals required to complete the work as shown on the contract drawings and as specified herein. 027404 Page 3 of 3 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 028020 SEEDING 1. DESCRIPTION This specification shall govern all work necessary for tilling, fertilizing, planting seeds, mulching, watering and maintaining vegetation required to complete the project. 2. MATERIALS 2.1 FERTILIZER: All fertilizer shall be delivered in bags or clearly marked containers showing the analysis, name, trademark and warranty. The fertilizer is subject to testing by the State Chemist in accordance with the Texas fertilizer law. Fertilizer shall have an analysis of 12-12-12 (percent of nitrogen, phosphoric acid and potash) as determined by the Association of Official Agricultural Chemists. Fertilizer shall be free flowing and uniform in composition. 2.2 SEED: Seed shall be labeled and meet the requirements of the Texas Seed Law. Labels shall indicate purity, germination, name and type of seed. Seed furnished shall be of the previous season's crop, and the date of analysis shown on each bag shall be within twelve months of delivery to the project. The quantity of"Commercial Seed" required to equal the quantity of"Pure Live Seed" shall be computed by the following formula: Commercial Seed=Pure Live Seed x 10,000 %Purity x % Germination The quantity of pure live seed and type required are indicated below. Mixture A or C shall be used for this project, depending on the time of the year planting is performed. LB/ACRE OF PURE LIVE SEED FOR MIXTURES COMMON NAME SCIENTIFIC NAME A B C Green Sprangletop Leptochloa Dubia 1.4 1.4 - Sideoats Grama(premier) Bouteloua Curtipendula 0.6 - 0.6 Bermudagrass (Hulled) Cynodon Dactylon 7.0 7.4 - Bermudagrass (Unhulled) Cynodon Dactylon - - 30.0 K-R Bluestem Andropogon Ischaemum 1.2 1.2 1.5 Buffalograss Buchloe Dactyloides - 4.2 - Annual Ryegrass Lolium Multiflorum 5.0 5.0 20.0 Mixture-A: Recommended for clay or tight soil planted between December 1 thru May 1. Mixture-B: Recommended for sandy soil planted between December 1 thru May 1. Mixture- C: Recommended for all soils planted between May 2 thru November 30. 028020 Page 1 of 4 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 2.3 MULCH: Mulch shall be either the straw type or wood cellulose fiber type. Straw Type mulch shall be of straw from stalks of domestic grain, Bermudagrass or cotton hulls, or other approved by the Engineer. Wood Cellulose Fiber Type mulch shall have no growth inhibiting ingredients and shall be dried with a moisture content less that 10% by weight. Fibers shall be dyed an appropriate color to facilitate visual metering and application of mulch. The cellulose fiber shall be manufactured so that after addition and agitation in slurry tank with fertilizers, seeds and other approved additives, the fibers in the material will become uniformly suspended to form a homogeneous slurry; when sprayed on the ground, the material shall form a uniform cover impregnated with seeds; the cover shall allow added water to percolate to the underlying soil. The fiber material shall be supplied in packages of not more than 100 lb. gross weight and shall be marked by the manufacturer to indicate the dry weight content. 2.4 EQUIPMENT: The fertilizing, seeding and/or mulching operations shall be accomplished with equipment suitable to the required function. It shall be of current design and in good operating condition. Special seeding and mulching equipment must also meet the following requirements: Seeder - Equipment for applying a seed-fertilizer mix shall be a hydraulic seeder designed to pump and discharge a waterborne, homogeneous slurry of seed and fertilizer. The seeder shall be equipped with a power driven agitator and capable of pressure discharge. Straw Mulch Spreader - Equipment used for straw mulch application shall be trailer mounted, equipped with a blower capable of 2000 r.p.m. operation, and that will discharge straw mulch material through a discharge boom with spout at speeds up to 220 feet per second. The mulch spreader shall be equipped with an asphalt supply and application system near the discharge end of the boom spout. The system shall apply asphalt adhesive in atomize form to the straw at a predetermined rate. The spreader shall be capable of blowing the asphalt-coated mulch, with a high velocity airstream, over the surface at a uniform rate, forming a porous, stable erosion-resistant cover. Wood Cellulose Fiber Mulch Spreader - Equipment used for this application of fertilizer, seeds, wood pulp, water and other additives shall have a built-in agitation system with sufficient capacity to agitate, suspend and homogeneously mix a slurry containing up to 40 lbs. of fiber plus the required fertilizer solids for each 100 gallons of water. It shall have sufficient agitation and pump capacity to spray a slurry in a uniform coat over the area to be mulched. 028020 Page 2 of 4 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 3. CONSTRUCTION METHODS 3.1 PREPARATION OF SEEDBED: The area to be treated along with requirements for seed, fertilizer and other treatments, shall be done as indicated on the drawings and as specified below. Clearing—Refer to City Standard Specification Section 021020, "Site Clearing and Stripping". Grading - Refer to City Standard Specification Section 021040, "Site Grading". Tilling - The area to be seeded shall be tilled to a depth of 4 to 6 inches by disking,plowing, or other approved methods until soil condition is acceptable. Topsoiling — If the native soils are not conducive to the establishment and maintenance of grass growth, or if called for on the drawings,topsoil shall be placed over the area to be seeded to a depth of 5 inches after tilling. Topsoil shall have a pH range of 5.5 to 7; shall contain between 2 and 20 percent organic material content in accordance with ASTM D5268; and shall be free of stones larger than one inch, debris, and extraneous materials harmful to plant growth. 3.2 FERTILIZING: Fertilizer shall be uniformly applied at a rate of 400 lb/acre, after tilling. Fertilizing and seeding shall be done concurrently. If seeds and fertilizer are distributed in a water slurry, the mixture shall be applied to the area to be seeded within 30 minutes after all the components have come into contact. 3.3 SEEDING: The seed mixture shall be uniformly distributed at the rate specified above. Broadcast Seeding - Seed shall be placed with fertilizer, after tilling. After planting, the area shall be rolled on contour with a corrugated roller. Straw Mulch Seeding - Seed shall be placed with fertilizer, after tilling. After placement of the seed and fertilizer mixture, straw mulch shall be uniformly placed at a rate of 2 tons per acre. As soon as the mulch has been spread, it shall be anchored to the soil a minimum depth of 3 inches by use of a heavy, dulled disk harrow, set nearly straight. Disks shall be set approximately 9 inches apart. Straw Mulch With Asphalt Seeding - Seed, fertilizer and straw mulch shall be placed as described in "Straw Mulch Seeding" with the following two exceptions: 1) An asphalt-water emulsion shall be applied to the mulch near the discharge end of the boom spout at a rate of 300 to 600 gallons per acre. 2)Mechanical anchoring by disking will not be required. Asphalt Mulch Seeding - The seed and fertilizer shall be placed as described for 'Broadcast Seeding". After the area has been rolled, the area shall be watered sufficiently to assure a uniform moisture to a minimum depth of 4 inches. An asphalt-water emulsion shall be applied at a rate of 1500 to 1800 gallons per acre, immediately after watering. Asphalt shall be applied to the area in such a manner that a complete film is obtained and the finished surface shall be 028020 Page 3 of 4 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 comparatively smooth. Wood Cellulose Fiber Mulch Seeding - After tilling, mulch shall be applied. Wood cellulose fibers shall be added to the hydraulic seeder after the proportionate amounts of seed, fertilizer, water and other approved materials are added. Application shall be 1500 lb./acre on flats, 2000 lb./acre on slopes up to 3:1, and 2500 lb./acre on slopes steeper than 3:1. One hundred (100)pounds of fiber per acre shall be used when asphalt is to be applied over cellulose mulch. The mulch shall provide a uniform cover over the soil surface. Asphalt Over Wood Cellulose Fiber Mulch Seeding - "Wood Cellulose Fiber Mulch Seeding" shall be done as described above. After mulch has been placed, an asphalt-water emulsion shall be uniformly spread over the mulch at a rate of 1200 gallons per acre. 3.4 MAINTENANCE: The Contractor shall water, repair and reseed areas as required for a period of 45 days or until growth has been established, whichever is longer. This includes erosion damage. Maintenance does not include mowing or weed control, unless indicated on the plans. If at any time the seeded area becomes gullied or otherwise damaged, or the seeds have been damaged or destroyed, the affected portion shall be re-established to the specified condition prior to acceptance of the work. 3.5 GUARANTEE: The Contractor shall assure 95% of the seeded area has established grass growth at 45 calendar days after seeding, unless indicated otherwise on the drawings. Where established, grass growth is defined as at least one plant per square foot with no bare spots larger than three (3) square feet. The Contractor shall re-establish grass growth as directed by the Engineer during the one-year warranty period. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, seeding will be measured by the horizontal square yard of area seeded within the areas designated on the drawings. Areas disturbed by the Contractor that are outside of the designated areas (such as field office, laydown/ storage area, stockpile areas, etc.) shall be seeded by the Contractor for erosion control per the stormwater pollution prevention plan but will not be measured for payment. Payment shall be full compensation for all labor, materials, tools, equipment and incidentals necessary to complete the work, and shall include, but not be limited to, tilling soil, topsoiling, fertilizing, planting, mulching, watering and maintaining vegetation. Payment shall be due and payable only after grass growth has been established as described above. 028020 Page 4 of 4 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 028040 SODDING 1. DESCRIPTION This specification shall govern all work necessary for furnishing and placing sod as required to complete the project. 2. MATERIALS Fertilizer: All fertilizer used shall be delivered in bags or containers with clearly marked analysis. A granulated fertilizer shall be used with an analysis of 10-20-10. These figures represent the percent of nitrogen, phosphoric acid and potash nutrients, respectively, as determined by the methods of the Association of Official Agricultural Chemists. The rate of application shall be not less than 350 pounds per acre (7.23 lb. per 100 SY). In the event that it is necessary to substitute a fertilizer with a different analysis, it shall be granulated fertilizer with a lower concentration. The total nutrients applied per unit area shall not be less that the specified amount of each nutrient. Sod: Sod shall consist of live Bermuda grass with thickly matted roots throughout the soil and with a minimum thickness of 3 inches or 0.25 foot, or live St. Augustine with thickly matted roots throughout the soil with a minimum thickness of 1 inch or 0.08 foot. The Contractor shall not use sod where grass is thinned out. Grass shall be mowed and raked to remove all weeds and long stems prior to extraction at the source. Sod and soil shall be kept moist at all times during the sodding process. Care must be taken at all times to retain native soil on the root system. Water: Water shall be free from oils, acids, alkalis, and salts that may inhibit grass growth. Unless indicated otherwise on the drawings, water shall be provided by the City and shall be transported and applied by the Contractor. 3. CONSTRUCTION METHODS Spot Sodding: Prior to planting, the area to be sodded shall be graded and shaped. Squares of sod with a minimum width of 3 inches shall be planted in rows on 15-inch centers in both directions. Sod shall be placed so that it is firmly against the bottom of the hole, and the top of the sod shall not be more than 1/2 inch below finished grade. Soil shall be firmly packed against all sides of the sod. Soil shall not be allowed to cover the sod except for soil incidental to raking, provided that the quantity of soil is not enough to hinder the growth. Areas to be spot sodded shall be indicated on the drawing or as directed by the Engineer in field. After sod has been planted,the area shall be fertilized and watered. 028040 Page 1 of 2 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Block Sodding: Prior to planting, the area to be sodded shall be graded and shaped. Sod blocks shall be uniformly placed over the prepared area. The sodded area shall then be fertilized and watered. After the area is sufficiently dry, the area shall be rolled or tamped to form a thoroughly compacted mat. Any voids in the mats shall be filled with additional sod and tamped. If, in the opinion of the Engineer, slopes may cause displacement, areas to be block sodded shall be indicated on the drawings or as directed by the Engineer in the field. Mulch Sodding: The sod source shall be disked in two directions cutting the sod thoroughly to a depth of not less than 4 inches or more than 10 inches, being careful to avoid having soil containing no grass roots. The disked sod may be windrowed or otherwise handled in a manner satisfactory to the Engineer. The material shall be rejected if not kept in a moist condition. Prior to placing mulch sod, the cut slopes shall be scarified by plowing furrows 4 inches to 6 inches deep along horizontal slope lines at 2-foot vertical intervals. Excavated material from the furrows shall not protrude more than 3 inches above the original surface of the cut. Fertilizer shall be distributed uniformly over the area. The sod shall then be dumped upon the prepared area and spread uniformly to the required approximate thickness shown on the plans. Any section not true to lines and cross section shall be remedied by the addition of sod material. After the sod material has been spread and shaped, it shall be compacted with a corrugated roller of the "Cultipacker" type. All rolling of slope areas shall be on the contour. The area to be mulch sodded shall be indicated on the drawings or as directed by the Engineer in the field. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, spot sodding and block sodding shall be measured by the square yard taken in a horizontal plane. Payment shall include, but not be limited to, excavation, transporting, storing and placing of sod, and application of fertilizer and water. 028040 Page 2 of 2 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 028300 FENCE RELOCATION 1. DESCRIPTION This specification shall govern all work necessary to accomplish the relocation of any fence that needs to be moved to complete this project. The necessity and the time schedule for relocation of any given fence shall be determined by the Engineer. 2. MATERIALS Whenever possible, all or part of the existing fence materials shall be used in constructing the relocated fence. Any materials damaged or destroyed as a result of removal of the fence from its existing location shall be replaced with materials of equal or better quality at the expense of the contractor. 3. CONSTRUCTION METHODS It is the intent of this specification that fences be reconstructed to original condition (condition at time just prior to commencement of construction on this project). Unless otherwise specified, no fence shall be replaced until the area surrounding its new location has been worked to its finished grade. Any fence that is damaged while being removed shall be repaired prior to being reset or replaced with like kind. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, fence relocation shall be measured by the linear foot of relocated fence (not fence removed from original location). Payment shall constitute full compensation for removal, replacement, necessary repairs, and all other work related to the relocation of fences. 028300 Page 1 of 1 Rev.1030-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 030020 PORTLAND CEMENT CONCRETE 1. DESCRIPTION This specification shall govern for the materials used; for the storing and handling of materials; and for the proportioning and mixing of concrete for culverts, manholes, inlets, curb and gutter, sidewalks, driveways, curb ramps, headwalls and wingwalls, riprap, and incidental concrete construction. The concrete shall be composed of Portland cement, aggregates (fine and coarse), admixtures if desired or required, and water,proportioned and mixed as hereinafter provided. 2. MATERIALS (1) Cement The cement shall be either Type I,II or III Portland cement conforming to ASTM Designation: C150, modified as follows: Unless otherwise specified by the Engineer,the specific surface area of Type I and II cements shall not exceed 2000 square centimeters per gram (Wagner Turbidimeter— TxDOT Test Method Tex-310-D). For concrete piling, the above limit on specific surface area is waived for Type II cement only. The Contractor shall furnish the Engineer, with each shipment, a statement as to the specific surface area of the cement expressed in square centimeters per gram. For cement strength requirements, either the flexural or compressive test may be used. Either Type I or II cement shall be used unless Type II is specified on the plans. Except when Type II is specified on the plans, Type III cement may be used when the anticipated air temperature for the succeeding 12 hours will not exceed 60°F. Type III cement may be used in all precast prestressed concrete, except in piling when Type II cement is required for substructure concrete. Different types of cement may be used in the same structure, but all cement used in any one monolithic placement shall be of the same type and brand. Only one brand of each type will be permitted in any one structure unless otherwise authorized by the Engineer. Cement may be delivered in bulk where adequate bin storage is provided. All other cement shall be delivered in bags marked plainly with the name of the manufacturer and the type of cement. Similar information shall be provided in the bills of lading accompanying each shipment of packaged or bulk cement. Bags shall contain 94 pounds net. All bags shall be in good condition at time of delivery. All cement shall be properly protected against dampness. No caked cement will be accepted. Cement remaining in storage for a prolonged period of time may be retested and rejected if it fails to conform to any of the requirements of these specifications. 030020 Page 1 of 13 Rev.1MO-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 (2) Mixing Water Water for use in concrete and for curing shall be free from oils, acids, organic matter or other deleterious substances and shall not contain more than 1000 parts per million of chlorides as CL nor more than 1000 parts per million of sulfates as 5O4. Water from municipal supplies approved by the State Health Department will not require testing,but water from other sources will be sampled and tested before use in structural concrete. Tests shall be made in accordance with the "Method of Test for Quality of Water to be Used in Concrete" (AASHTO Method T26), except where such methods are in conflict with provisions of this specification. (3) Coarse Agate Coarse aggregate shall consist of durable particles of gravel, crushed blast furnace slag, crushed stone, or combinations thereof, free from frozen material or injurious amount of salt, alkali, vegetable matter, or other objectionable material either free or as an adherent coating; and its quality shall be reasonably uniform throughout. It shall not contain more than 0.25 percent by weight of clay lumps, nor more than 1.0 percent by weight of shale, nor more than 5 percent by weight of laminated and/or friable particles when tested in accordance with TxDOT Test Method Tex-413-A. It shall have a wear of not more than 40 percent when tested in accordance with TxDOT Test Method Tex-410-A. Unless otherwise specified on the plans, coarse aggregate will be subjected to five cycles of the soundness test in accordance with TxDOT Test Method Tex-411-A. The loss shall not be greater than 12 percent when sodium sulfate is used, or 18 percent when magnesium sulfate is used. Permissible sizes of aggregate shall be governed by Table 4 and Table 1, except that when exposed aggregate surfaces are required, coarse aggregate gradation will be as specified on the plans. When tested by approved methods, the coarse aggregate, including combinations of aggregates when used, shall conform to the grading requirements shown in Table 1. 030020 Page 2 of 13 Rev.1MO-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 TABLE 1 Coarse Aggregate Gradation Chart Percent Retained on Each Sieve Aggregate Nominal 2-'/z 2 1-�/z 1 3/4 1/2 3/8 Grade No. Size In. In. In. In. In. In. In. No. 4 No. 8 1 2 in. 0 0 to 15 60 to 95 to 20 to 80 100 50 2 (467)* 1-'/z in. 0 0 30 to 70 95 to to 65 to 100 5 90 4(57)* 1 in. 0 0 40 90 to 95 to to to 100 100 5 75 8 3/8 in. 0 0 to 35 to 90 to 5 80 100 *Numbers in parenthesis indicate conformance with ASTM C33. The aggregate shall be washed. The Loss by Decantation (TxDOT Test Method Tex-406-A) plus the allowable weight of clay lumps, shall not exceed one percent, or the value shown on the plans, whichever is smaller. (4) Fine Aggregate Fine aggregate shall consist of clean, hard, durable and uncoated particles of natural or manufactured sand or a combination thereof, with or without a mineral filler. It shall be free from frozen material or injurious amounts of salt, alkali, vegetable matter or other objectionable material and it shall not contain more than 0.5 percent by weight of clay lumps. When subjected to the color test for organic impurities (TxDOT Test Method Tex-408-A), it shall not show a color darker than standard. The fine aggregate shall produce a mortar having a tensile strength equal to or greater than that of Ottawa sand mortar when tested in accordance with TxDOT Test Method Tex-317-D. Where manufactured sand is used in lieu of natural sand for slab concrete subject to direct traffic,the acid insoluble residue of the fine aggregate shall be not less than 28 percent by weight when tested in accordance with TxDOT Test Method Tex-612-J. When tested by approved methods, the fine aggregate or combination of aggregates, including mineral filler, shall conform to the grading requirements shown in Table 2. 030020 Page 3 of 13 Rev.1MO-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 TABLE 2 Fine Aggregate Gradation Chart Percent Retained on Each Sieve Aaares4ate Grade No. 3/8 In. No.4 No. 8 No. 16 No. 30 No. 50 No. 100 No. 200 1 0 0 to 5 0 to 20 15 to 50 35 to 75 70 to 90 90 to 100 97 to 100 NOTE 1: Where manufactured sand is used in lieu of natural sand,the percent retained on the No. 200 sieve shall be 94 to 100. NOTE 2: Where the sand equivalent value is greater than 85, the retainage on the No. 50 sieve may be 70 to 94 percent. Fine aggregate will be subjected to the Sand Equivalent Test (TxDOT Test Method Tex-203-F). The sand equivalent shall not be less than 80 nor less than the value shown on the plans, whichever is greater. For concrete Classes `A' and `C', the fineness modulus as defined below for fine aggregates shall be between 2.30 and 3.10. The fineness modulus will be determined by adding the percentages by weight retained on the following sieves, and dividing by 100; Nos. 4, 8, 16, 30, 50 and 100. (5) Mineral Filler Mineral filler shall consist of stone dust, clean crushed sand, or other approved inert material. (6) Mortar(Grout) Mortar for repair of concrete shall consist of 1 part cement, 2 parts finely graded sand, and enough water to make the mixture plastic. When required to prevent color difference, white cement shall be added to produce the color required. When required by the Engineer, latex adhesive shall be added to the mortar. (7) Admixtures Calcium Chloride will not be permitted. Unless otherwise noted, air-entraining,retarding and water- reducing admixtures may be used in all concrete and shall conform to the following requirements: A "water-reducing, retarding admixture" is defined as a material which, when added to a concrete mixture in the correct quantity, will reduce the quantity of mixing water required to produce concrete of a given consistency and will retard the initial set of the concrete. A "water-reducing admixture" is defined as a material which, when added to a concrete mixture in the correct quantity,will reduce the quantity of mixing water required to produce concrete of a given 030020 Page 4 of 13 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 consistency. (a) Retarding and Water-Reducing Admixtures. The admixture shall meet the requirements for Type A and Type D admixture as specified in ASTM Designation: C494,modified as follows: (1) The water-reducing retarder shall retard the initial set of the concrete a minimum of 2 hours and a maximum of 4 hours, at a specified dosage rate, at a temperature of 90°F. (2) The cement used in any series of tests shall be either the cement proposed for specific work or a "reference" Type I cement from one mill. (3) Unless otherwise noted on the plans, the minimum relative durability factor shall be 80. The air-entraining admixture used in the referenced and test concrete shall be neutralized Vinsol resin. (b) Air-Entraining Admixture. The admixture shall meet the requirements of ASTM Designation: C260, modified as follows: (1) The cement used in any series of tests shall be either the cement proposed for specific work or a "reference" Type I cement from one mill. (2) Unless otherwise noted on the plans, the minimum relative durability factor shall be 80. The air-entraining admixture used in the referenced concrete shall be neutralized Vinsol resin. 3. STORAGE OF CEMENT All cement shall be stored in well-ventilated weatherproof buildings or approved bins, which will protect it from dampness or absorption of moisture. Storage facilities shall be ample, and each shipment of packaged cement shall be kept separated to provide easy access for identification and inspection. The Engineer may permit small quantities of sacked cement to be stored in the open for a maximum of 48 hours on a raised platform and under waterproof covering. 4. STORAGE OF AGGREGATE The method of handling and storing concrete aggregate shall prevent contamination with foreign materials. If the aggregates are stored on the ground, the sites for the stockpiles shall be clear of all vegetation and level. The bottom layer of aggregate shall not be disturbed or used without recleaning. 030020 Page 5 of 13 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 When conditions require the use of two or more sizes of aggregates, they shall be separated to prevent intermixing. Where space is limited, stockpiles shall be separated by physical barriers. Methods of handling aggregates during stockpiling and subsequent use shall be such that segregation will be minimized. Unless otherwise authorized by the Engineer, all aggregate shall be stockpiled at least 24 hours to reduce the free moisture content. 5. MEASUREMENT OF MATERIALS The measurement of the materials, except water, used in batches of concrete, shall be by weight. The fine aggregate, coarse aggregate and mineral filler shall be weighed separately. Where bulk cement is used, it shall be weighed separately, but batch weighing of sacked cement will not be required. Where sacked cement is used, the quantities of material per batch shall be based upon using full bags of cement. Batches involving the use of fractional bags will not be permitted. Allowance shall be made for the water content in the aggregates. Bags of cement varying more than 3 percent from the specified weight of 94 pounds may be rejected, and when the average weight per bag in any shipment, as determined by weighing 50 bags taken at random, is less than the net weight specified, the entire shipment may be rejected. If the shipment is accepted, the Engineer will adjust the concrete mix to a net weight per bag fixed by an average of all individual weights which are less than the average weight determined from the total number weighed. 6. CLASSIFICATION AND MIX DESIGN It shall be the responsibility of the Contractor to furnish the mix design, using a coarse aggregate factor acceptable to the Engineer, for the class(es) of concrete specified. The mix shall be designed by a qualified concrete technician to conform with the requirements contained herein and in accordance with the THD Bulletin C-11. The Contractor shall perform, at his own expense, the work required to substantiate the design, except the testing of strength specimens, which will be done by the Engineer. Complete concrete design data shall be submitted to the Engineer for approval. It shall also be the responsibility of the Contractor to determine and measure the batch quantity of each ingredient, including all water, so that the mix conforms to these specifications and any other requirements shown on the plans. Trial batches will be made and tested using all of the proposed ingredients prior to placing the concrete, and when the aggregate and/or brand of cement or admixture is changed. Trial batches shall be made in the mixer to be used on the job. When transit mix concrete is to be used, the trial designs will be made in a transit mixer representative of the mixers to be used. Batch size shall not be less than 50 percent of the rated mixing capacity of the truck. Mix designs from previous or concurrent jobs may be used without trial batches if it is shown that no 030020 Page 6 of 13 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 substantial change in any of the proposed ingredients has been made. The coarse aggregate factor shall not be more than 0.82, except that when the voids in the coarse aggregate exceed 48 percent of the total dry loose volume, the coarse aggregate factor shall not exceed 0.85. The coarse aggregate factor shall not be less than 0.70 for Grades 1, 2 and 3 aggregates. If the strength required for the class of concrete being produced is not secured with the cement specified in Table 4, the Contractor may use an approved water-reducing or retarding admixture, or he shall furnish aggregates with different characteristics which will produce the required results. Additional cement may be required or permitted as a temporary measure until the redesign is checked. Water-reducing or retarding agents may be used with all classes of concrete at the option of the Contractor. When water-reducing or retarding agents are used at the option of the Contractor, reduced dosage of the admixture will be permitted. Entrained air will be required in accordance with Table 4. The concrete shall be designed to entrain 5 percent air when Grade 2 coarse aggregate is used and 6 percent when Grade 3 coarse aggregate is used. Concrete as placed in the structure shall contain the proper amount as required above with a tolerance of plus or minus 1.5 percentage points. Occasional variations beyond this tolerance will not be cause for rejection. When the quantity of entrained air is found to be above 7 percent with Grade 2 coarse aggregate or above 8 percent for Grade 3 coarse aggregate, additional test beams or cylinders will be made. If these beams or cylinders pass the minimum flexural or compressive requirements,the concrete will not be rejected because of the variation in air content. 7. CONSISTENCY In cases where the consistency requirements cannot be satisfied without exceeding the maximum allowable amount of water,the Contractor may use, or the Engineer may require, an approved water- reducing or retarding agent, or the Contractor shall furnish additional aggregates or aggregates with different characteristics,which will produce the required results. Additional cement may be required or permitted as a temporary measure until aggregates are changed and designs checked with the different aggregates or admixture. The consistency of the concrete as placed should allow the completion of all finishing operations without the addition of water to the surface. When field conditions are such that additional moisture is needed for the final concrete surface finishing operation,the required water shall be applied to the surface by fog spray only, and shall be held to a minimum. The concrete shall be workable, cohesive, possess satisfactory finishing qualities, and of the stiffest consistency that can be placed and vibrated into a homogenous mass. Excessive bleeding shall be avoided. Slump requirements will be as specified in Table 3. 030020 Page 7 of 13 Rev.1MO-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 TABLE 3 Slump Requirements Concrete Designation Desired Slump Max. Slump Structural Concrete: (1) Thin-Walled Sections(9" or less) 4 inches 5 inches (2) Slabs, Caps, Columns,Piers, Wall Sections over 9",etc. 3 inches 4 inches Underwater or Seal Concrete 5 inches 6 inches Riprap, Curb, Gutter and Other Miscellaneous Concrete 2.5 inches 4 inches NOTE: No concrete will be permitted with slump in excess of the maximums shown. 8. QUALITY OF CONCRETE General The concrete shall be uniform and workable. The cement content, maximum allowable water- cement ratio, the desired and maximum slump and the strength requirements of the various classes of concrete shall conform to the requirements of Table 3 and Table 4 and as required herein. During the process of the work, the Engineer or his designated representative will cast test cylinders or beams as a check on the compressive or flexural strength of the concrete actually placed. Test cylinders must be picked up by the testing lab within 24 hours. A test shall be defined as the average of the breaking strength of two cylinders or two beams, as the case may be. Specimens will be tested in accordance with TxDOT Test Methods Tex-418-A or Tex-420-A. Test beams or cylinders will be required as specified in the contract documents. For small placements on structures such as manholes, inlets, culverts, wingwalls, etc., the Engineer may vary the number of tests to a minimum of one for each 25 cubic yards placed over a several day period. All test specimens, beams or cylinders, representing tests for removal of forms and/or falsework shall be cured using the same methods, and under the same conditions as the concrete represented. "Design Strength" beams and cylinders shall be cured in accordance with THD Bulletin C-11. The Contractor shall provide and maintain curing facilities as described in THD Bulletin C-11 for the purpose of curing test specimens. Provision shall be made to maintain the water in the curing tank at temperatures between 70°F and 90°F. When control of concrete quality is by twenty-eight-day compressive tests, job control will be by seven-day compressive tests which are shown to provide the required twenty-eight-day strength, based on results from trial batches. If the required seven-day strength is not secured with the cement 030020 Page 8 of 13 Rev.1MO-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 specified in Table 4, changes in the batch design will be made. TABLE 4 Classes of Concrete Minimum Class Compressive Min.Beam Maximum Coarse of Sacks Cement Strength(f c) Strength Water-Cement Aggregate Concrete per C.Y. (min.) 28-Day(psi) 7-Day(psi) Ratio (gal/sack) No. A* 5.0 3000 500*** 6.5 2-4-8**** B* 4.5 2500 417 8.0 2-4-8**** C* 6.0 3600 600*** 6.0 1-2-4** D 6.0 3000 500 7.0 2-4 S 6.5 4000 570 5.0 2-4 *Entrained Air(slabs,piers and bent concrete). **Grade 1 Coarse Aggregate may be used in foundation only (except cased drilled shafts). ***When Type II Cement is used with Class C Concrete, the 7-day beam break requirement will be 550 psi; with Class A Concrete,the minimum 7-day beam break requirement will be 460 psi. ****Permission to use Grade 8 Aggregate must have prior approval of the Engineer. 9. MIXING CONDITIONS The concrete shall be mixed in quantities required for immediate use. Any concrete which is not in place within the limits outlined in City Standard Specification Section 038000 "Concrete Structures", Article "Placing Concrete-General", shall not be used. Retamping of concrete will not be permitted. In threatening weather, which may result in conditions that will adversely affect the quality of the concrete to be placed, the Engineer may order postponement of the work. Where work has been started and changes in weather conditions require protective measures, the Contractor shall furnish adequate shelter to protect the concrete against damage from rainfall, or from freezing temperatures. If necessary to continue operations during rainfall, the Contractor shall also provide protective coverings for the material stockpiles. Aggregate stockpiles need be covered only to the extent necessary to control the moisture conditions in the aggregates to adequately control the consistency of the concrete. 10. MIXING AND MIXING EQUIPMENT All equipment, tools, and machinery used for hauling materials and performing any part of the work shall be maintained in such condition to insure completion of the work underway without excessive delays for repairs or replacements. The mixing shall be done in a batch mixer of approved type and size that will produce uniform 030020 Page 9 of 13 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 distribution of the material throughout the mass. Mixers may be either the revolving drum type or the revolving blade type, and shall be capable of producing concrete meeting the requirements of these specifications. After all the ingredients are assembled in the drum, the mixing shall continue not less than 1 minute for mixers of one cubic yard or less capacity plus 15 seconds for each additional cubic yard or portion thereof. The mixer shall operate at the speed and capacity designated by the Mixer Manufacturers Bureau of the Associated General Contractors of America. The mixer shall have a plate affixed showing the manufacturer's recommended operating data. The absolute volume of the concrete batch shall not exceed the rated capacity of the mixer. The entire contents of the drum shall be discharged before any materials are placed therein for the succeeding batch. The first batch of concrete materials placed in the mixer for each placement shall contain an extra quantity of sand, cement and water sufficient to coat the inside surface of the drum. Upon the cessation of mixing for any considerable length of time, the mixer shall be thoroughly cleaned. The concrete mixer shall be equipped with an automatic timing device which is put into operation when the skip is raised to its full height and dumping. This device shall lock the discharging mechanism and prevent emptying of the mixer until all the materials have been mixed together for the minimum time required, and it shall ring a bell after the specified time of mixing has elapsed. The water tank shall be arranged so that the amount of water can be measured accurately, and when the tank starts to discharge,the inlet supply shall cut off automatically. Whenever a concrete mixer is not adequate or suitable for the work, it shall be removed from the site upon a written order from the Engineer and a suitable mixer provided by the Contractor. Pick-up and thro-over blades in the drum of the mixer which are worn down more than 10 percent in depth shall be repaired or replaced with new blades. Improperly mixed concrete shall not be placed in the structure. Job mix concrete shall be concrete mixed in an approved batch mixer in accordance with the requirements stated above, adjacent to the structure for which the concrete is being mixed, and moved to the placement site in non-agitating equipment. 11. READY-MIX PLANTS A. General. It shall be the Contractor's responsibility to furnish concrete meeting all requirement of the governing specification sections, and concrete not meeting the slump, workability and consistency requirements of the governing specification sections shall not be 030020 Page 10 of 13 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 placed in the structure or pavement. Ready-Mixed Concrete shall be mixed and delivered by means of one of the following approved methods. (1) Mixed completely in a stationary mixer and transported to the point of delivery in a truck agitator or a truck mixer operating at truck agitator or truck mixer agitation speed. (Central-Mix Concrete) (2) Mixed complete in a truck mixer and transported to the placement site at mixing and/or agitating speed (Transit-Mix Concrete), subject to the following provisions: (a) Truck mixers will be permitted to transport concrete to the job site at mixing speed if equipped with double actuated counters which will separate revolutions at mixing speed from total revolutions. (b) Truck mixers equipped with a single actuated counter counting total revolutions of the drum shall mix the concrete at the plant not less than 50 nor more than 70 revolutions at mixing speed, transport it to the job site at agitating speed and complete the required mixing before placing the concrete. (3) Mixed completely in a stationery mixer and transported to the job site in approved non-agitating trucks with special bodies. This method of transporting will be permitted for concrete pavement only. B. Equipment. (1) Batching Plant. The batching plant shall be provided with adequate bins for batching all aggregates and materials required by the specifications. Bulk cement shall be weighed on a scale separate from those used for other materials and in a hopper entirely free and independent of that used for weighing the aggregates. (2) Mixers and Agitators. _ (a) General: Mixers shall be of an approved stationary or truck-type capable of combining the ingredients into a thoroughly mixed and uniform mass. Facilities shall be provided to permit ready access to the inside of the drum for inspection, cleaning and repair of blades. Mixers and agitators shall be subject to daily examination for changes in condition due to accumulation of hardened concrete and/or wear of blades, and any hardened concrete shall be removed before the mixer will be permitted to be used. Worn blades shall be repaired or replaced with new in 030020 Page 11 of 13 Rev.1MO-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 accordance with the manufacturer's design and arrangement for that particular unit when any part or section is worn as much as 10 percent below the original height of the manufacturer's design. (b) Stationary Mixers: These shall conform to the requirements of Article "Mixing and Mixing Equipment". Truck mixers mounted on a stationary base will not be considered as a stationary mixer. (c) Truck Mixers: In addition, truck mixers shall comply with the following requirements: An engine in satisfactory working condition and capable of accurately gauging the desired speed of rotation shall be mounted as an integral part of the mixing unit for the purpose of rotating the drum. Truck mixers equipped with a transmission that will govern the speed of the drum within the specified revolutions per minute(rpm)will not require a separate engine. All truck mixers shall be equipped with actuated counters by which the proper number of revolutions of the drum, as specified in Article 11. A. above, may be readily verified. The counters shall be read and recorded at the start of mixing at mixing speeds. Each until shall have adequate water supply and accurate metering or gauging devices for measuring the amount used. (d) Agitators: Concrete agitators shall be of the truck type, capable of maintaining a thoroughly mixed and uniform concrete mass and discharging it within the same degree of uniformity specified for mixers. Agitators shall comply with all of the requirements for truck mixers, except for the actual mixing requirements. C. Operation of Plant and Equipment. Delivery of ready-mixed concrete shall equal or exceed the rate approved by the Engineer for continuous placement. In all cases, the delivery of concrete to the placement site shall assure compliance with the time limits in the applicable specification for depositing successive batches in any monolithic unit. The Contractor shall satisfy the Engineer that adequate standby trucks are available. A standard ticket system will be used for recording concrete batching,mixing and delivery date. Tickets will be delivered to the job inspector. Loads arriving without ticket and/or in unsatisfactory condition shall not be used. When a stationary mixer is used for the entire mixing operation, the mixing time for one cubic yard of concrete shall be one minute plus 15 seconds for each additional cubic yard or portion thereof. This mixing time shall start when all cement, aggregates and initial water have entered the drum. 030020 Page 12 of 13 Rev.1MO-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 The mixer shall be charged so that some of the mixing water will enter the drum in advance of the cement and aggregate. All of the mixing water shall be in the drum by the end of the first one-fourth of the specified mixing time. Water used to flush down the blades after charging shall be accurately measured and included in the quantity of mixing water. The introduction of the initial mixing water, except blade wash down water and that permitted in this Article, shall be prior to or simultaneous with the charging of the aggregates and cement. The loading of truck mixers shall not exceed 63 percent of the total volume of the drum. When used as an agitator only,the loading shall not exceed 80 percent of the drum volume. When Ready-Mix Concrete is used, additional mortar (one sack cement, three parts sand and sufficient water) shall be added to the batch to coat the drum of the mixer or agitator truck, and this shall be required for every load of Class C concrete only and for the first batch from central mix plants. A portion of the mixing water, required by the batch design to produce the desired slump, may be withheld and added at the job site, but only with permission of the Engineer and under his supervision. When water is added under the above conditions, it shall be thoroughly mixed as specified below for water added at the job site. Mixing speed shall be attained as soon as all ingredients are in the mixer, and each complete batch (containing all the required ingredients) shall be mixed not less than 70 nor more than 100 revolutions of the drum at mixing speed except that when water is added at the job site, 25 revolutions (minimum) at mixing speed will be required to uniformly disperse the additional water throughout the mix. Mixing speed shall be as designated by the manufacturer. All revolutions after the prescribed mixing time shall be at agitating speed. The agitating speed shall be not less than one (1) nor more than five (5) rpm. The drum shall be kept in continuous motion from the time mixing is started until the discharge is completed. 12. PLACING, CURING AND FINISHING The placing of concrete, including construction of forms and falsework, curing and finishing, shall be in accordance with City Standard Specification Section 038000 "Concrete Structures". 13. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, the quantities of concrete of the various classifications which will constitute the completed and accepted structure(s) in-place will be measured by the cubic yard, per each, square foot, square yard or linear foot, as the case may be. Measurement will be as shown on the drawings and/or in the Bid Form. Payment shall be full compensation for furnishing, hauling, mixing,placing, curing and finishing all concrete; all grouting and pointing; furnishing and placing drains; furnishing and placing metal flashing strips; furnishing and placing expansion joint material required by this specification or shown on the plans; and for all forms and falsework, labor, tools, equipment and incidentals necessary to complete the work. 030020 Page 13 of 13 Rev.1MO-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 032020 REINFORCING STEEL 1. DESCRIPTION This specification shall govern the furnishing and placing of reinforcing steel, deformed and smooth, of the size and quantity designated on the plans and in accordance with these specifications. 2. MATERIALS Unless otherwise designated on the plans, all bar reinforcement shall be deformed, and shall conform to ASTM Designation: A 615, Grades 60 or 75, and shall be open hearth, basic oxygen, or electric furnace new billet steel. Large diameter new billet steel(Nos. 14 and 18), Grade 75,will be permitted for straight bars only. Where bending of bar sizes No. 14 or No. 18 of Grade 60 is required, bend testing shall be performed on representative specimens as described for smaller bars in the applicable ASTM Specification. The required bend shall be 90 degrees around a pin having a diameter of 10 times the nominal diameter of the bar. Spiral reinforcement shall be smooth (not deformed) bars or wire of the minimum diameter shown on the plans, and shall be made by one or more of the following processes: open hearth, basic oxygen, or electric furnace. Bars shall be rolled from billets reduced from ingots and shall comply with ASTM Designation: A 306, Grade 65 minimum (references to ASTM Designation: A 29 is voided). Dimensional tolerances shall be in accordance with ASTM Designation: A 615, or ASTM Designation: A 615, Grade 60, except for deformations. Wire shall be cold-drawn from rods that have been hot-rolled from billets and shall comply with ASTM Designation: A 185. In cases where the provisions of this specification are in conflict with the provisions of the ASTM Designation to which reference is made,the provisions of this specification shall govern. Report of chemical analysis showing the percentages of carbon, manganese,phosphorus and sulphur will be required for all reinforcing steel when it is to be welded. 032020 Page 1 of 6 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 The nominal size and area and the theoretical weight of reinforcing steel bars covered by this specification are as follows: Nominal Weight per Bar Size Diameter, Nominal Area, Linear Foot, Number In. Sq. In. Pounds 2 0.250 0.05 0.167 3 0.375 0.11 0.376 4 0.500 0.20 0.668 5 0.625 0.31 1.043 6 0.750 0.44 1.502 7 0.875 0.60 2.044 8 1.000 0.79 2.670 9 1.128 1.00 3.400 10 1.270 1.27 4.303 11 1.410 1.56 5.313 14 1.693 2.25 7.6 18 2.257 4.00 13.60 Smooth round bars shall be designated by size number through No. 4. Smooth bars larger than No. 4 shall be designated by diameter in inches. When wire is ordered by gauge numbers, the following relation between gauge number and diameter,in inches, shall apply unless otherwise specified: Equivalent Equivalent Gauge Diameter, Gauue Diameter, Number Inches Number Inches 0 0.3065 8 0.1620 1 0.2830 9 0.1483 2 0.2625 10 0.1350 3 0.2437 11 0.1205 4 0.2253 12 0.1055 5 0.2070 13 0.0915 6 0.1920 14 0.0800 7 0.1770 032020 Page 2 of 6 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 3. BENDING The reinforcement shall be bent cold, true to the shapes indicated on the plans. Bending shall preferably be done in the shop. Irregularities in bending shall be cause for rejection. Unless otherwise shown on the plans, the inside diameter of bar bends, in terms of the nominal bar diameter(d), shall be as follows: Bends of 90 degrees and greater in stirrups, ties and other secondary bars that enclose another bar in the bend: Grade 60 93, #4, 95 4d 96, #7, #8 5d All bends in main bars and in secondary bars not covered above: Grade 60 Grade 75 43 thru 48 6d 49, 410 8d -- 911 8d 8d 914, 918 10d -- 032020 Page 3 of 6 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 4. TOLERANCES Fabricating tolerances for bars shall be within 3 percent of specified or as follows: Plan Dimon. a 3/4" 7/8*' Bar or Smaller—Plan. Dimon. t I Bar or Larger --P+on. D+men. * 1" H= over 6"--Damen.+ Zero or H = 6 a—`nd lass-{}imen. + Zero or -i/4" H 7/8- Bar or Sma/ier--Plan Dimon. = i/Z' r I" Bar or t_arger—Plan Oisnen. : 1'* viral or Circular Tie Tie or giFP41onCO)ime;n.*IY Plan Oin-=a=1/2 5. STORING Steel reinforcement shall be stored above the surface of the ground upon platforms, skids or other supports, and shall be protected as far as practicable from mechanical injury and surface deterioration caused by exposure to conditions producing rust. When placed in the work, reinforcement shall be free from dirt, paint, grease, oil, or other foreign materials. Reinforcement shall be free from injurious defects such as cracks and laminations. Rust, surface seams, surface irregularities or mill scale will not be cause for rejection, provided the minimum dimensions, cross- sectional area and tensile properties of a hand wire crushed specimen meets the physical requirements for size and grade of steel specified. 6. SPLICES No splicing of bars, except when provided on the plans or specified herein,will be permitted without written approval of the Engineer. Splices will not be permitted in main reinforcement at points of maximum stress. When permitted in main bars, splices in adjacent bars shall be staggered a minimum of two splice lengths. 032020 Page 4 of 6 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 TABLE 1 Minimum Lap Requirements Lap Uncoated Coated Lap in inches > 40d 60d Where: d=bar diameter in inches Welding of reinforcing bars may be used only where shown on the plans or as permitted herein. All welding operations, processes, equipment, materials, workmanship and inspection shall conform to the requirements of the drawings and industry standards. All splices shall be of such dimension and character as to develop the full strength of bar being spliced. End preparation for butt welding reinforcing bars shall be done in the field. Delivered bars shall be of sufficient length to permit this practice. For box culvert extensions with less than one foot of fill, the existing longitudinal bars shall have a 20-diameter lap with the new bars. For box culvert extensions with more than one foot of fill, a minimum of 6 inches lap will be required. Unless otherwise shown on the plans, dowel bars transferring tensile stresses shall have a minimum embedment equal to the minimum lap requirements shown in Table 1. Shear transfer dowels shall have a minimum embedment of 12 inches. 7. PLACING Reinforcement shall be placed as near as possible in the position shown on the plans. Unless otherwise shown on the plans, dimensions shown for reinforcement are to the centers of the bars. In the plane of the steel parallel to the nearest surface of concrete, bars shall not vary from plan placement by more than one-twelfth of the spacing between bars. In the plane of the steel perpendicular to the nearest surface of concrete, bars shall not vary from plan placement by more than one-quarter inch. Cover of concrete to the nearest surface of steel shall meet the above requirements but shall never be less than one inch or as otherwise shown on the plans. Vertical stirrups shall always pass around the main tension members and be attached securely thereto. The reinforcing steel shall be spaced its required distance from the form surface by means of approved galvanized metal spacers, metal spacers with plastic coated tips, stainless steel spacers, plastic spacers, or approved pre-cast mortar or concrete blocks. For approval of plastic spacers on the project, representative samples of the plastic shall show no visible indications of deterioration after immersion in a 5 percent solution of sodium hydroxide for 120 hours. All reinforcing steel shall be tied at all intersections, except that where spacing is less than one foot in each direction, alternate intersections only need be tied. Before any concrete is placed, all mortar shall be cleaned from the reinforcement. Precast mortar or concrete blocks to be used for holding steel in position adjacent to formed surfaces shall be cast in molds meeting the approval of the Engineer and shall be cured by covering with wet burlap or cotton 032020 Page 5 of 6 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 mats for a period of 72 hours. The blocks shall be cast in the form of a frustum of a cone or pyramid with the smaller face placed against the forms. A suitable tie wire shall be provided in each block, to be used for anchoring to the steel. Except in unusual cases, and when specifically otherwise authorized by the Engineer, the size of the surface to be placed adjacent to the forms shall not exceed two and one-half inches square or the equivalent thereof in cases where circular or rectangular areas are provided. Blocks shall be cast accurately to the thickness required, and the surface to be placed adjacent to the forms shall be a true plane free of surface imperfections. Reinforcement shall be supported and tied in such manner that a sufficiently rigid case of steel is provided. If the cage is not adequately supported to resist settlement or floating upward of the steel, overturning of truss bars or movement in any direction during concrete placement, permission to continue concrete placement will be withheld until corrective measures are taken. Sufficient measurements shall be made during concrete placement to insure compliance with the first paragraph of Article 7 of this specification. Mats of wire fabric shall overlap each other sufficiently to maintain a uniform strength and shall be fastened securely at the ends and edges. No concrete shall be deposited until the Engineer has inspected the placement of the reinforcing steel and given permission to proceed. 8. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, reinforcing steel is considered subsidiary to the various items shown in the Bid Form and shall not be measured and paid for as a separate item. 032020 Page 6 of 6 Rev.10-30-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 038000 CONCRETE STRUCTURES 1. DESCRIPTION This specification shall govern for construction of all types of structures involving the use of structural concrete, except where the requirements are waived or revised by other governing specifications. All concrete structures shall be constructed in accordance with the design requirements and details shown on the plans; in conformity with the pertinent provisions of the items contracted for; the incidental specifications referred to; and in conformity with the requirements herein. 2. MATERIALS (1) Concrete. All concrete shall conform to the provisions of City Standard Specification Section 030020 "Portland Cement Concrete". The class of concrete for each type of structure or unit shall be as specified on the plans or by pertinent governing specifications. (2) Expansion Joint Material. (a) Preformed Fiber Material. Preformed fiber expansion joint material shall be of the dimensions shown on the plans. The material shall be one of the following types, unless otherwise noted on the plans: 1. Preformed Bituminous Fiber Materials shall meet the requirements of ASTM Designation: D1751 "Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Non-extruding and Resilient Bituminous Types)". 2. Preformed Non-Bituminous Fiber Material shall meet the requirements of ASTM Designation: D1751 "Standard Specification for Preformed Expansion Joint Filler for Concrete Paving and Structural Construction (Non-extruding and Resilient Bituminous Types)",except that the requirements pertaining to bitumen content, density and water absorption shall be voided. 3. Redwood. (b) Joint Sealing Materials. Unless otherwise shown on the drawings, joint sealing material shall conform to the following requirements. The material shall adhere to the sides of the concrete joint or crack and shall form an effective seal against infiltration of water and incompressibles. The material shall not crack or break when exposed to low temperatures. 038000 Page 1 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 1. Class 1-a. (Two-Component, Synthetic Polymer,Cold-Extruded Type). Curing is to be by polymerization and not by evaporation of solvent or fluxing of harder particles. This type is specifically designed for vertical or sloping joints and hence not self-leveling. It shall cure sufficiently at an average temperature of 77 degrees F ± 3 degrees F in a maximum of 24 hours. For performance requirements see under 2.(2)(b)2. below. 2. Class 1-b. (Two-Component, Synthetic Polymer,Cold-Pourable, Self-Leveling Type). Curing is to be by polymerization and not by evaporation of solvent or fluxing of harder particles. It shall cure sufficiently at an average temperature of 77 degrees F ± 3 degrees F in a maximum of 3 hours. Performance Requirements: Class 1-a and Class 1-b joint materials,when tested in accordance with TxDOT Test Method Tex-525-C,shall meet the above curing times and the following requirements: It shall be of such consistency that it can be mixed and poured, or mixed and extruded into joints at temperatures above 60 degrees F. Penetration, 77°F.: 150 gm. cone, 5 sec., max., cm.................. 0.90 Bond and Extension 75%, O°F, 5 cycles: Dry Concrete Blocks............................ Pass Wet Concrete Blocks............................ Pass Steel Blocks...(Primed if specified by manuf.). Pass Flow at 200°F................................. None Water Content%by weight, max................. 5.0 Resilience: Original sample min. % (cured)................. 50 Oven aged at 158°F min. % .................... 50 For Class 1-a Material Only: Cold Flow(10 min.)............................ None (c) Asphalt Board. Asphalt Board shall consist of two liners of 0.016-inch asphalt impregnated paper,filled with a mastic mixture of asphalt and vegetable fiber and/or mineral filler. Boards shall be smooth,flat and sufficiently rigid to permit installation. When tested in accordance with TxDOT Test Method Tex-524-C,the asphalt board shall not deflect from the horizontal more than one inch in three and one-half inches (1" in 31/2"). (d) Rebonded Neoprene Filler. Rebonded neoprene filler shall consist of ground closed- cell neoprene particles, rebonded and molded into sheets of uniform thickness, of the dimensions shown on plans. Filler material shall have the following physical properties and shall meet the requirements of ASTM Designation: D 1752"Standard Specification for Preformed Sponge Rubber and Cork Expansion Joint Fillers for Concrete Paving and Structural Construction", Type 1, where applicable: 038000 Page 2 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 PROPERTY METHOD REQUIREMENT Color ASTM D1752, Type 1 Black Density ASTM D1752, Type 1 40 lb./ft' Min. Recovery ASTM D1752, Type 1 90% Min. Compression ASTM D1752, Type 1 50 to 500 psi Extrusion ASTM D1752, Type 1 0.25 inch Max. Tensile Strength ASTM D1752, Type 1 20 psi Min. Elongation 75% Min. The manufacturers shall furnish the Engineer with certified test results as to compliance with the above requirements and a 12 inch x 12 inch x 1 inch sample from the shipment for approval. (3) Curing Materials. (a) Membrane curing materials shall comply with ASTM Designation: C 309 "Standard Specification for Liquid Membrane-Forming Compounds for Curing Concrete",Type 1 clear or translucent, or Type 2 white-pigmented. The material shall have a minimum flash-point of 80 degrees F when tested by the "Pensky-Martin Closed Cup Method". It shall be of such consistency that it can be satisfactorily applied as a fine mist through an atomizing nozzle by means of approved pressure spraying equipment at atmospheric temperatures above 40 degrees F. It shall be of such nature that it will not produce permanent discoloration of concrete surfaces nor react deleteriously with the concrete or its components. Type 1 compound shall contain a fugitive dye that will be distinctly visible not less than 4 hours nor more than 7 days after application. The compound shall produce a firm,continuous,uniform moisture impermeable film free from pinholes and shall adhere satisfactorily to the surfaces of damp concrete. It shall,when applied to the damp concrete surface at the rate of coverage specified herein,be dry to the touch in not more than 4 hours, and shall adhere in a tenacious film without running off or appreciable sagging. It shall not disintegrate, check,peel or crack during the required curing period. The compound shall not peel or pick up under traffic and shall disappear from the surface of the concrete by gradual disintegration. The compound shall be delivered to the job only in the manufacturer's original containers, which shall be clearly labeled with the manufacturer's name, the trade name of the material, and a batch number or symbol with which test samples may be correlated. The water retention test shall be in accordance with TxDOT Test Method Tex-219-F. Percentage loss shall be defined as the water lost after the application of the curing material was applied. The permissible percentage moisture loss (at the rate of coverage specified herein) shall not exceed the 038000 Page 3 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 following: 24 hours after application............2 percent 72 hours after application............4 percent Type 1 (Resin Base Only)curing compound will be permitted for slab concrete in bridge decks and top slabs of direct traffic culverts. (b) Mat curing of concrete is allowed where permitted by Table 1 in this specification or where otherwise approved by the Engineer. 3. EXPANSION JOINTS Joints and devices to provide for expansion and contraction shall be constructed where and as indicated herein or on the plans. All open j oints and j oints to be filled with expansion j oint material,shall be constructed using forms adaptable to loosening or early removal. To avoid expansion or contraction damage to the adjacent concrete, these forms shall be loosened as soon as possible after final concrete set to permit free movement without requiring full form removal. Prior to placing the sealing material, the vertical facing the joint shall be cleaned of all laitance by sandblasting or by mechanical routing. Cracked or spalled edges shall be repaired. The joint shall be blown clean of all foreign material and sealed. Where preformed fiber j oint material is used,it shall be anchored to the concrete on one side of the joint by light wire or nails, to prevent the material from falling out. The top one inch (1") of the joint shall be filled with joint sealing material. Finished joints shall conform to the indicated outline with the concrete sections completely separated by the specified opening or joint material. Soon after form removal and again where necessary after surface finishing, all projecting concrete shall be removed along exposed edges to secure full effectiveness of the expansion joints. 4. CONSTRUCTION JOINTS The j oint formed by placing plastic concrete in direct contact with concrete that has attained its initial set shall be deemed a construction joint. The term "monolithic placement" shall be interpreted to mean at the manner and sequence of concrete placing shall not create construction joints. Construction joints shall be of the type and at the locations shown on the plans. Additional joints will not be permitted without written authorization from the Engineer, and when authorized, shall have details equivalent to those shown on the plans for joints in similar locations. Unless otherwise provided, construction joints shall be square and normal to the forms. Bulkheads shall be provided in the forms for all joints, except when horizontal. Construction joints requiring the use of joint sealing material shall be as detailed on the plans. The 038000 Page 4 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 material will be specified on the plans without referenced to joint type. A concrete placement terminating at a horizontal construction joint shall have the top surface roughened thoroughly as soon as practicable after initial set is attained. The surfaces at bulkheads shall be roughened as soon as the forms are removed. The hardened concrete surface shall be thoroughly cleaned of all loose material, laitance, dirt or foreign material, and saturated with water so it is moist when placing fresh concrete against it. Forms shall be drawn tight against the placing of the fresh concrete. 5. FORMS (1) General. Except where otherwise specified, forms may be of either timber or metal. Forms for round columns exposed to view shall be of steel, except that other materials will be allowed with written permission of the Engineer. Forming plans shall be submitted to the Engineer for approval as specified. Forms shall be designed for the pressure exerted by a liquid weighing 150 pounds per cubic foot. The rate of placing the concrete shall betaken into consideration in determining the depth of the equivalent liquid. For job fabricated forms,an additional live load of 50 pounds per square foot shall be allowed on horizontal surfaces. The maximum unit stresses shall not exceed 125 percent of the allowable stresses used by the Texas Department of Transportation for the design of structures. Commercially produced structural units used in formwork shall not exceed the manufacturer's maximum allowable working load for moment,shear or end reaction. The maximum working load shall include a live load of 35 pounds per square foot of horizontal form surface, and sufficient details and data shall be submitted for use in checking formwork details for approval. Forms shall be practically mortar-tight,rigidly braced and strong enough to prevent bulging between supports, and maintained to the proper line and grade during concrete placement. Forms shall be maintained in a manner that will prevent warping and shrinkage. Offset at form joints shall not exceed one-sixteenth of an inch (1/16"). Deflections due to cast-in-place slab concrete and railing shown in the dead load deflection diagram shall be taken into account in the setting of slab forms. All forms and footing areas shall be cleaned of any extraneous matter before placing concrete. Permission to place concrete will not be given until all such work is completed to the satisfaction of the Engineer. If, at any stage of the work,the forms show signs of bulging or sagging,the portion of the concrete causing such condition shall be removed immediately,if necessary, and the forms shall be reset and securely braced against further movement. 038000 Page 5 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 (2) Timber Forms. Lumber for forms shall be properly seasoned, of good quality, and free from imperfections which would affect its strength or impair the finished surface of the concrete. The lumber used for facing or sheathing shall be finished on at least one side and two edges and shall be sized to uniform thickness. Form lining will be required for all formed surfaces, except for the inside of culvert barrels, inlets and manholes; surfaces that are subsequently covered by backfill material or are completely enclosed; and, any surface formed by a single finished board. Lining will not be required when plywood forms are used. Form lining shall be of an approved type such as Masonite or plywood. Thin membrane sheeting, such as polyethylene sheets, shall not be used for form lining. Forms may be constructed of plywood not less than one-half inch in thickness,with no form lining required. The grain of the face plies on plywood forms shall be placed parallel to the span between the supporting studs or joists. Plywood used for forming surfaces that remain exposed shall be equal to that specified as B-B Plyform Class I or Class II Exterior, of the U. S. Department of Commerce, National Bureau of Standards and Technology, latest edition. Forms or form lumber to be reused shall be maintained clean and in good condition. Any lumber which is split, warped, bulged, marred, or has defects that will produce inferior work, shall not be used and, if condemned, shall be promptly removed from the work. Studs and joists shall be spaced so that the facing form material remains in true alignment under the imposed loads. Wales shall be spaced close enough to hold forms securely to the designated lines and scabbed at least 4 feet on each side of joints to provide continuity. A row of wales shall be placed near the bottom of each placement. Facing material shall be placed with parallel and square joints and securely fastened to supporting studs. Forms for surfaces receiving only an ordinary finish and exposed to view shall be placed with the form panels symmetrical, i.e., long dimensions set in the same direction. Horizontal joints shall be continuous. Molding specified for chamfer strips or other uses shall be made of materials of a grade that will not split when nailed and which can be maintained to a true line without warping. Wood molding shall be mill cut and dressed on all faces. Unless otherwise provided, forms shall be filleted at all sharp corners and edges with triangular chamfer strips measuring three-quarter inch (3/4") on the sides. Forms for railing and ornamental work shall be constructed to standards equivalent to first-class millwork. All moldings,panel work and bevel strips shall be straight and true with nearly mitered joints designed so the finished work is true, sharp and clean cut. 038000 Page 6 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 All forms shall be constructed to permit their removal without marring or damaging the concrete. The forms may be given a slight draft to permit ease of removal. Metal form ties of an approved type or a satisfactory substitute shall be used to hold forms in place and shall be of a type that permits ease of removal of the metal as hereinafter specified. All metal appliances used inside of forms for alignment purposes shall be removed to a depth of at least one-half inch (1/2") from the concrete surface. They shall be made so the metal may be removed without undue chipping or spalling,and when removed,shall leave a smooth opening in the concrete surface. Burning off of rods, bolts or ties will not be permitted. Any wire ties used shall be cut back at least one-half inch (1/2") from the face of the concrete. Devices holding metal ties in place shall be capable of developing the strength of the tie and adjustable to allow for proper alignment. Metal and wooden spreaders which are separate from the forms shall be removed entirely as the concrete is being placed. Adequate clean-out openings shall be proved for narrow walls and other locations where access to the bottom of the forms is not readily attainable. Prior to placing concrete, the facing of all forms shall be treated with oil or other bond breaking coating of such composition that it will not discolor or otherwise injuriously affect the concrete surface. Care shall be exercised to prevent coating of the reinforcing steel. (3) Metal Forms. The foregoing requirements for timber forms regarding design,mortar-tightness, filleted corners,beveled projections,bracing,alignment,removal,reuse and wetting shall also apply to metal forms, except that these will not require lining, unless specifically noted on the plans. The thickness of form metal shall be as required to maintain the true shape without warping or bulging. All bolt and rivet heads on the facing sides shall be countersunk. Clamps,pins or other connecting devices shall be designed to hold the forms rigidly together and to allow removal without injury to the concrete. Metal forms which do not present a smooth surface or line up properly shall not be used. Metal shall be kept free from rust, grease or other foreign materials. 6. PLACING REINFORCEMENT Reinforcement in concrete structures shall be placed carefully and accurately and rigidly supported as provided in the City Standard Specification Section 032020 "Reinforcing Steel". Reinforcing steel supports shall not be welded to I-beams or girders. 7. PLACING CONCRETE-GENERAL The minimum temperature of all concrete at the time of placement shall be not less than 50 degrees F. 038000 Page 7 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 The consistency of the concrete as placed should allow the completion of all finishing operations without the addition of water to the surface. When conditions are such that additional moisture is needed for finishing,the required water shall be applied to the surface by fog spray only,and shall be held to a minimum amount. Fog spray for this purpose may be applied with hand operated fogging equipment. The maximum time interval between the addition of cement to the batch and the placing of concrete in the forms shall not exceed the following: Air or Concrete Temperature Maximum Time Non-Agitated Concrete: Above 80 degrees F 15 minutes Up to 80 degrees F 30 minutes Agitated Concrete: Above 90 degrees F 45 minutes 75 degrees F to 90 degrees F 60 minutes 35 degrees F to 74 degrees F 90 minutes The use of an approved retarding agent in the concrete will permit the extension of each of the above temperature-time maximums by 30 minutes for direct traffic culverts, and one hour for all other concrete except that the maximum time shall not exceed 30 minutes for non-agitated concrete. Before starting work,the Contractor shall inform the Engineer fully of the construction methods he proposes to use, the adequacy of which shall be subject to the approval of the Engineer. The Contractor shall give the Engineer sufficient advance notice before placing concrete in any unit of the structure to permit the inspection of forms,reinforcing steel placement,and other preparations. Concrete shall not be placed in any unit prior to the completion of formwork and placement of reinforcement therein. Concrete mixing, placing and finishing shall be done during daylight hours, unless adequate provisions are made to light the entire site of all operations. Concrete placement will not be permitted when impending weather conditions will impair the quality of the finished work. If rainfall should occur after placing operations are started,the Contractor shall provide ample covering to protect the work. In case of drop in temperature,the provisions set forth in Article "Placing Concrete in Cold Weather" of this specification shall be applied. The placing of concrete shall be regulated so the pressures caused by the plastic concrete shall not exceed the loads used in form design. 038000 Page 8 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 The method of handling, placing and consolidation of concrete shall minimize segregation and displacement of the reinforcement, and produce a uniformly dense and compact mass. Concrete shall not have a free fall of more than 5 feet,except in the case of thin walls such as in culverts. Any hardened concrete spatter ahead of the plastic concrete shall be removed. The method and equipment used to transport concrete to the forms shall be capable of maintaining the rate of placement approved by the Engineer. Concrete may be transported by buckets, chutes, buggies, belt conveyors,pumps or other acceptable methods. When belt conveyors or pumps are used, sampling for testing will be done at the discharge end. Concrete transported by conveyors shall be protected from sun and wind,if necessary,to prevent loss of slump and workability. Pipes through which concrete is pumped shall be shaded and/or wrapped with wet burlap, if necessary, to prevent loss of slump and workability. Concrete shall not be transported through aluminum pipes, tubes or other aluminum equipment. Chutes,troughs, conveyors or pipes shall be arranged and used so that the concrete ingredients will not be separated. When steep slopes are necessary,the chutes shall be equipped with baffle boards or made in short lengths that reverse the direction of movement, or the chute ends shall terminate in vertical downspouts. Open troughs and chutes shall extend, if necessary, down inside the forms or through holes left in them. All transporting equipment shall be kept clean and free from hardened concrete coatings. Water used for cleaning shall be discharged clear of the concrete. Each part of the forms shall be filled by depositing concrete as near its final position as possible. The coarse aggregate shall be worked back from the face and the concrete forced under and around the reinforcement bars without displacing them. Depositing large quantities at one point and running or working it along the forms will not be allowed. Concrete shall be deposited in the forms in layers of suitable depth but not more than 36 inches in thickness, unless otherwise directed by the Engineer. The sequence of successive layers or adjacent portions of concrete shall be such that they can be vibrated into a homogenous mass with the previously placed concrete without a cold j oint. Not more than one hour shall elapse between adjacent or successive placements of concrete. Unauthorized construction joints shall be avoided by placing all concrete between the authorized joints in one continuous operation. An approved retarding agent shall be used to control stress cracks and/or unauthorized cold j oints in mass placements where differential settlement and/or setting time may induce stress cracking. Openings in forms shall be provided, if needed, for the removal of laitance of foreign matter of any kind. All forms shall be wetted thoroughly before the concrete is placed therein. All concrete shall be well consolidated and the mortar flushed to the form surfaces by continuous working with immersion type vibrators. Vibrators which operate by attachment to forms or reinforcement will not be permitted, except on steel forms. At least one stand-by vibrator shall be 038000 Page 9 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 provided for emergency use in addition to those required for placement. The concrete shall be vibrated immediately after deposit. Prior to the beginning of work, a systematic spacing of the points of vibration shall be established to insure complete consolidation and thorough working of the concrete around the reinforcement, embedded fixtures, and into the corners and angles of the forms. Immersion type vibrators shall be inserted vertically,at points 18 to 30 inches apart, and slowly withdrawn. The vibrator may be inserted in a sloping or horizontal position in shallow slabs. The entire depth of each lift shall be vibrated, allowing the vibrator to penetrate several inches into the preceding lift. Concrete along construction joints shall be thoroughly consolidated by operating the vibrator along and close to butnot againstthe joint surface. The vibration shall continue until thorough consolidation,and complete embedment of reinforcement and fixtures is produced,but not long enough to cause segregation. Vibration may be supplemented by hand spading or rodding,if necessary,to insure the flushing of mortar to the surface of all forms. Slab concrete shall be mixed in a plant located off the structure. Carting or wheeling concrete batches over completed slabs will not be permitted until they have aged at least four(4)full curing days. If carts are used,timber planking will be required for the remainder of the curing period. Carts shall be equipped with pneumatic tires. Curing operations shall not be interrupted for the purpose of wheeling concrete over finished slabs. After concrete has attained its initial set,at least one(1)curing day shall elapse before placing strain on projecting reinforcement to prevent damage to the concrete. The storing of reinforcing or structural steel on completed roadway slabs generally shall be avoided and, when permitted, shall be limited to quantities and distribution that will not induce excessive stresses. 8. PLACING CONCRETE IN COLD WEATHER (1) Cast-in-Place Concrete. Concrete maybe placed when the atmospheric temperature is not less than 35 degrees F. Concrete shall not be placed in contact with any material coated with frost or having a temperature less than 32 degrees F. Aggregates shall be free from ice, frost and frozen lumps. When required, in order to produce the minimum specified concrete temperature,the aggregate and/or the water shall be heated uniformly, in accordance with the following: The water temperature shall not exceed 180 degrees F,and/or the aggregate temperature shall not exceed 150 degrees F. The heating apparatus shall heat the mass of aggregate uniformly. The temperature of the mixture of aggregates and water shall be between 50 degrees F and 85 degrees F before introduction of the cement. All concrete shall be effectively protected as follows: (a) The temperature of slab concrete of all unformed surfaces shall be maintained at 50 degrees F or above for a period of 72 hours from time of placement and above 40 degrees F for an additional 72 hours. 038000 Page 10 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 (b) The temperature at the surface of all concrete in piers, culverts walls,retaining walls,parapets,wingwalls,bottoms of slabs,and other similar formed concrete shall be maintained at 40 degrees F or above for a period of 72 hours from time of placement. (c) The temperature of all concrete, including the bottom slabs of culverts placed on or in the ground, shall be maintained above 32 degrees F for a period of 72 hours from time of placement. Protection shall consist of providing additional covering, insulated forms or other means, and if necessary, supplementing such covering with artificial heating. Curing as specified under Article "Curing Concrete" of this specification shall be provided during this period until all requirements for curing have been satisfied. When impending weather conditions indicate the possibility of the need for such temperature protection, all necessary heating and covering material shall be on hand ready for use before permission is granted to begin placement. Sufficient extra test specimens will be made and cured with the placement to ascertain the condition of the concrete as placed,prior to form removal and acceptance. (2) Precast Concrete. A fabricating plant for precast products which has adequate protection from cold weather in the form of permanent or portable framework and covering, which protects the concrete when placed in the forms,and is equipped with approved steam curing facilities,may place concrete under any low temperature conditions provided: (a) The framework and covering are placed and heat is provided for the concrete and the forms within one hour after the concrete is placed. This shall not be construed to be one hour after the last concrete is placed,but that no concrete shall remain unprotected longer than one hour. (b) Steam heat shall keep the air surrounding the concrete between 50 degrees F and 85 degrees F for a minimum of three hours prior to beginning the temperature rise which is required for steam curing. (c) For fabricating plants without the above facilities and for j ob site precast products,the requirements of the Article "Curing Concrete" of this specification shall apply. The Contractor is responsible for the protection of concrete placed under any and all weather conditions. Permission given by the Engineer for placing concrete during freezing weather will in no way relieve the Contractor of the responsibility for producing concrete equal in quality to that placed under normal conditions. Should concrete placed under such conditions prove unsatisfactory,it shall be removed and replaced at no additional cost. 038000 Page 11 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 9. PLACING CONCRETE IN WATER Concrete shall be deposited in water only when specified on the plans or with written permission by the Engineer. The forms or cofferdams shall be sufficiently tight to prevent any water current passing through the space in which the concrete is being deposited. Pumping will not be permitted during the concrete placing, nor until it has set for at least 36 hours. The concrete shall be placed with a tremie, closed bottom-dump bucket,or other approved method, and shall not be permitted to fall freely through the water nor shall it be disturbed after it has been placed. The concrete surface shall be kept approximately level during placement. The tremie shall consist of a water-tight tube 14 inches or less in diameter. It shall be constructed so that the bottom can be sealed and opened after it is in place and fully charged with concrete. It shall be supported so that it can be easily moved horizontally to cover all the work area and vertically to control the concrete flow. Bottom-dump buckets used for underwater placing shall have a capacity of not less than one-half cubic yard. It shall be lowered gradually and carefully until it rests upon the concrete already placed and raised very slowly during the upward travel;the intent being to maintain still water at the point of discharge and to avoid agitating the mixture. The placing operations shall be continuous until the work is complete. 10. PLACING CONCRETE IN BOX CULVERTS In general, construction joints will be permitted only where shown on the plans. Where the top slab and walls are placed monolithically in culverts more than 4 feet in clear height, an interval of not less than one (1)nor more than two (2) hours shall elapse before placing the top slab to allow for shrinkage in the wall concrete. The base slab shall be finished accurately at the proper time to provide a smooth uniform surface. Top slabs which carry direct traffic shall be finished as specified for roadway slabs in Article"Finish of Roadway Slabs". Top slabs of fill type culverts shall be given a reasonably smooth float finish. 11. PLACING CONCRETE IN FOUNDATIONS AND SUBSTRUCTURE Concrete shall not be placed in footings until the depth and character of the foundation has been inspected by the Engineer and permission has been given to proceed. Placing of concrete footings upon seal concrete courses will be permitted after the caissons or cofferdams are free from water and the seal concrete course cleaned. Any necessary pumping or bailing during the concreting operation shall be done from a suitable sump located outside the forms. All temporary wales or braces inside cofferdams or caissons shall be constructed or adjusted as the work proceeds to prevent unauthorized construction joints in footings or shafts. 038000 Page 12 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 When footings can be placed in a dry excavation without the use of cofferdams or caissons, forms may be omitted,if desired by the Contractor and approved by the Engineer,and the entire excavation filled with concrete to the elevation of the top of footing; in which case, measurement for payment will be based on the footing dimensions shown on the plans. 12. TREATMENT AND FINISHING OF HORIZONTAL SURFACES EXCEPT ROADWAY SLABS All unformed upper surfaces shall be struck off to grade and finished. The use of mortar topping for surfaces under this classification will not be permitted. After the concrete has been struck off,the surface shall be floated with a suitable float. Sidewalks shall be given a wood float or broom finish, or may be striped with a brush, as specified by the Engineer. Other surfaces shall be wood float finished and striped with a fine brush leaving a fine- grained texture. 13. FINISH OF ROADWAY SLABS As soon as the concrete has been placed and vibrated in a section of sufficient width to permit working,the surface shall be approximately leveled,struck off and screeded,carrying a slight excess of concrete ahead of the screed to insure filling of all low spots. The screed shall be designed rigid enough to hold true to shape and shall have sufficient adjustments to provide for the required camber. A vibrating screed may be used if heavy enough to prevent undue distortion. The screeds shall be provided with a metal edge. Longitudinal screeds shall be moved across the concrete with a saw-like motion while their ends rest on headers or templates set true to the roadway grade or on the adjacent finished slab. The surface of the concrete shall be screeded a sufficient number of times and at such intervals to produce a uniform surface, true to grade and free of voids. If necessary, the screeded surface shall be worked to smooth finish with a long handled wood or metal float of the proper size, or hand floated from bridges over the slab. When required by the Engineer,the Contractor shall perform sufficient checks with a long handled 10-foot straightedge on the plastic concrete to insure that the final surface will be within the tolerances specified below. The check shall be made with the straightedge parallel to the centerline. Each pass thereof shall lap half of the preceding pass. All high spots shall be removed and all depressions over one-sixteenth inch(1/16")in depth shall be filled with fresh concrete and floated. The checking and floating shall be continued until the surface is true to grade and free of depressions, high spots, voids or rough spots. Rail support holes shall be filled with concrete and finished to match the top of the slab. Surface Texturing. Perform surface texturing using a either carpet drag or metal tining as indicated on the drawings. Complete final texturing before the concrete has attained its initial set. Draw the carpet drag 038000 Page 13 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 longitudinally along the pavement surface with the carpet contact surface area adjusted to provide a satisfactory coarsely textured surface. A metal-tine texture finish is required using a tining machine unless otherwise shown on the plans. Provide the metal-tine finish immediately after the concrete surface has set enough for consistent tining. Operate the metal-tine device to obtain grooves spaced at 1 in., approximately 3/16 in. deep,with a minimum depth of 1/8 in., and approximately 1/12 in. wide. Do not overlap a previously tined area. Use manual methods for achieving similar results on ramps and other irregular sections of pavements. Repair damage to the edge of the slab and joints immediately after texturing. Do not tine pavement that will be overlaid. Upon completion of the floating and/or straight edging and before the disappearance of the moisture sheen,the surface shall be given a broom or burlap drag finish. The grooves of these finishes shall be parallel to the structure centerline. It is the intent that the average texture depth resulting from the number of tests directed by the Engineer be not less than 0.035 inch with a minimum texture depth of 0.030 inch for anyone test when tested in accordance with TxDOT Test Method Tex-436-A. Should the texture depth fall below that intended, the finishing procedures shall be revised to produce the desired texture. After the concrete has attained its final set, the roadway surface shall be tested with a standard 10- foot straightedge. The straightedge shall be placed parallel to the centerline of roadway to bridge any depressions and touch high spots. Ordinates of irregularities measured from the face of the straightedge to the surface of the slab shall not exceed one-eighth of an inch (1/8"), making proper allowances for camber,vertical curvature and surface texture. Occasional variations,not exceeding three-sixteenth of an inch (3/16") will be acceptable, if in the opinion of the Engineer it will not affect the riding qualities. When directed by the Engineer, irregularities exceeding the above requirements shall be corrected. In all roadway slab finishing operations,camber for specified vertical curvature and transverse slopes shall be provided. 14. CURING CONCRETE The Contractor shall inform the Engineer fully of the methods and procedures proposed for curing; shall provide the proper equipment and material in adequate amounts; and shall have the proposed methods, equipment and material approved prior to placing concrete. Inadequate curing and/or facilities,therefore,shall be cause for the Engineer to stop all construction on the job until remedial action is taken. All concrete shall be cured for a period of four(4) curing days except as noted herein. 038000 Page 14 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 EXCEPTIONS TO 4-DAY CURING Description Required Curing Upper Surfaces of Bridge Slabs and 8 curing days (Type I or III) cement Top Slabs of Direct Traffic Culverts 10 curing days (Type 11 cement) Concrete Piling (non-prestressed) 6 curing days When the air temperature is expected to drop below 35 degrees F,the water curing mats shall be covered with polyethylene sheeting, burlap-polyethylene blankets or other material to provide the protection required by Article "Placing Concrete in Cold Weather" of these specifications. A curing day is defined as a calendar day when the temperature, taken in the shade away from artificial heat, is above 50 degrees F for at least 19 hours (colder days if satisfactory provisions are made to maintain the temperature of all surfaces of the concrete above 40 degrees F for the entire 24 hours). The required curing period shall begin when all concrete therein has attained its initial set. The following methods are permitted for curing concrete subj ect to the restrictions of Table 1 and the following requirements for each method of curing. (1) Form Curing. When forms are left in contact with the concrete, other curing methods will not be required except for cold weather protection. (2) Water Curing. All exposed surfaces of the concrete shall be kept wet continuously for the required curing time. The water used for curing shall meet the requirements for concrete mixing water as specified in the specification Section 030020 "Portland Cement Concrete". Seawater will not be permitted. Water which stains or leaves an unsightly residue shall not be used. (a) Wet Mat. Cotton mats shall be used for this curing method. They shall be placed as soon as possible after the surface has sufficiently hardened to prevent damage to the concrete. (See Article, "Placing Concrete" of this specification.) Damp burlap blankets made from nine-ounce stock may be placed on the damp concrete surface for temporary protection prior to the application of the cotton mats which may be placed dry and wetted down after placement. The mats shall be weighted down adequately to provide continuous contact with all concrete surfaces where possible. The surfaces of the concrete shall be kept wet for the required curing time. Surfaces which cannot be cured by contact shall be enclosed with mats and anchored positively to the forms or to the ground so that outside air cannot enter the enclosure. Sufficient moisture shall be provided inside the enclosure to keep all surfaces of the concrete wet. (b) Water Spru. This curing method shall consist of overlapping sprays or sprinklers that keep all unformed surfaces continuously wet. (c) Ponding. This curing method requires the covering of the surfaces with a minimum of two inches (2") of clean granular material, kept wet at all times, or a minimum of one-inch 038000 Page 15 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 (1") depth of water. Satisfactory provisions shall be made to provide a dam to retain the water or saturated granular material. (3) Membrane Curing. This consists of curing concrete pavement,concrete pavement(base),curbs, gutters, retards, sidewalks, driveways, medians, islands, concrete riprap, cement-stabilized riprap, concrete structures and other concrete as indicated on the plans by impervious membrane method. Unless otherwise provided herein or shown on the plans, either Type I-D or Type 2 membrane curing compound may be used where permitted except that Type 1-D (Resin Base Only) will be required for slab concrete in bridge decks and top slabs of direct traffic culverts. TABLE 1 REQUIRED PERMITTED MEMBRANE MEMBRANE STRUCTURE UNIT WATER FOR WATER FOR DESCRIPTION FOR INTERIM FOR INTERIM CURING CURING CURING CURING 1 Top slabs of direct traffic culverts X X 2 Top surface of any concrete unit upon which concrete is to be placed and bonded at a later interval (Stub walls, risers, etc.). X Other superstructure concrete (wing walls, parapet walls, etc.) 3 Concrete pavement (base), curbs, gutters, retards, sidewalks, driveways, medians, X* X* islands, concrete structures, concrete riprap, etc. 4 All substructure concrete, culverts, box sewers, inlets, X* X* manholes, retaining walls `Polyethylene sheeting, burlap-polyethylene mats or laminated mats to prevent outside air from entering will be considered equivalent to water or membrane curing for items 3 and 4. 038000 Page 16 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Membrane curing shall not be applied to dry surfaces,but shall be applied just after free moisture has disappeared. Formed surfaces and surfaces which have been given a first rub shall be dampened and shall be moist at the time of application of the membrane. When membrane is used for complete curing, the film shall remain unbroken for the minimum curing period specified. Membrane which is damaged shall be corrected immediately by reapplication of membrane. Unless otherwise noted herein or on the plans,the choice of membrane type shall be at the option of the Contractor. Only one type of curing compound will be permitted on any one structure. The membrane curing compound shall be applied after the surface finishing has been completed,and immediately after the free surface moisture has disappeared. The surface shall be sealed with a single uniform coating of curing compound applied at the rate of coverage recommended by the manufacturer and directed by the Engineer, but not less than 1 gallon per 180 square feet of area. The Contractor shall provide satisfactory means and facilities to properly control and check the rate of application of the compound. The compound shall be thoroughly agitated during its use and shall be applied by means of approved mechanical power pressure sprayers. The sprayers used to apply the membrane to concrete pavement or concrete pavement (base) shall travel at uniform speed along the forms and be mechanically driven. The equipment shall be of such design that it will insure uniform and even application of the membrane material. The sprayers shall be equipped with satisfactory atomizing nozzles. Only on small miscellaneous items will the Contractor be permitted to use hand-powered spray equipment. For all spraying equipment, the Contractor shall provide facilities to prevent the loss of the compound between the nozzle and the concrete surface during the spraying operations. The compounds shall not be applied to a dry surface. If the surface of the concrete has become dry, it shall be moistened prior to application of membrane by fogging or mist application. Sprinkling or coarse spraying will not be allowed. At locations where the coating shows discontinuities,pinholes or other defects,or if rain falls on the newly-coated surface before the film has dried sufficiently to resist damage,an additional coat of the compound shall be applied immediately at the same rate of coverage specified herein. To insure proper coverage, the Engineer shall inspect all treated areas after application of the compound for the period of time designated in the governing specification for curing, either for membrane curing or for other methods. Should the foregoing indicate that any area during the curing period is not protected, an additional coat or coats of the compound shall be applied immediately, and the rate of application of the membrane compound shall be increased until all areas are uniformly covered. When temperatures are such as to warrant protection against freezing,curing by this method shall be supplemented with an approved insulating material capable of protecting the concrete for the specified curing period. If at any time there is reason to believe that this method of curing is unsatisfactory or is detrimental 038000 Page 17 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 to the work,the Contractor,when notified, shall immediately cease the use of this method and shall change to curing by one of the other methods specified under this contract. 15. REMOVAL OF FORMS Except as herein provided, forms for vertical surfaces may be removed when the concrete has aged not less than one day(24 hours)when Type I and Type II cement is used, and not less than one-half day (12 hours) when Type III cement is used, provided it can be done without damage to the concrete. Forms for inside curb faces may be removed in approximately three hours provided it can be done without damage to the curb. 16. FINISHING EXPOSED SURFACES Concrete shall be finished as required in the specification Section for the respective item or as otherwise specified on the plans. An ordinary surface finish shall be applied to all concrete surfaces either as a final finish or preparatory to a higher finish. Ordinary Surface Finish shall be as follows: After form removal,all porous or honey-combed areas and spalled areas shall be corrected by chipping away all loose or broken material to sound concrete. Feather edges shall be eliminated by cutting a face perpendicular to the surface. Shallow cavities shall be repaired using adhesive grout or epoxy grout. If judged repairable by the Engineer, large defective areas shall be corrected using concrete or other material approved by the Engineer. Holes and spalls caused by removal of metal ties, etc., shall be cleaned and filled with adhesive grout or epoxy grout. Exposed parts of metal chairs on surfaces to be finished by rubbing, shall be chipped out to a depth of one-half inch (1/2") and the surface repaired. All fins,runs, drips or mortar shall be removed from surfaces which remain exposed. Form marks and chamfer edges shall be smoothed by grinding and/or dry rubbing. Grease, oil, dirt, curing compound, etc., shall be removed from surfaces requiring a higher grade of finish. Discolorations resulting from spillage or splashing of asphalt,paint or other similar material shall be removed. Repairs shall be dense,well bonded and properly cured, and when made on surfaces which remain exposed and do not require a higher finish, shall be finished to blend with the surrounding concrete. 038000 Page 18 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 17. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form,no direct measurement or payment will be made for the work to be done or the equipment to be furnished under this specification,but it shall be considered subsidiary to the particular items required by the plans and the contract documents. 038000 Page 19 of 19 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 SECTION 055420 FRAMES, GRATES, RINGS AND COVERS 1. DESCRIPTION This specification shall govern for the furnishing and installation of frames, grates, rings and covers for inlets, manholes and other structures in accordance with those details. Steel shall conform to the requirements of ASTM Designation: A36 "Standard Specification for Carbon Structural Steel". 2. MATERIALS Welded steel grates and frames shall conform to the member size, dimensions and details shown on the plans and shall be welded into an assembly in accordance with those details. Steel shall conform to the requirements of ASTM Designation: A36. Castings, whether Carbon-Steel, Gray Cast Iron or Ductile Iron, shall conform to the shape and dimensions shown on the plans and shall be clean substantial castings, free from burnt-on sand or blow holes, and shall be reasonable smooth. Runners, risers, fins, and other cast-on pieces shall be removed from the castings and such areas ground smooth. Bearing surfaces between manhole rings and covers or grates and frames shall be cast or machined with such precision that uniform bearing shall be provided throughout the perimeter contact area. Pairs of machined castings shall be matchmarked to facilitate subsequent identification at installation. Steel castings shall conform to the requirements of ASTM Designation: A27 "Standard Specification for Steel Castings, Carbon, for General Application". Grade 70-36 shall be furnished unless otherwise specified. Cast Iron castings shall conform to the requirements of ASTM Designation: A48 "Standard Specification for Gray Iron Castings", Class 30. Ductile iron castings shall conform to the requirements of ASTM Designation: A536 "Standard Specification for Ductile Iron Castings". Grade 60-40-18 shall be used otherwise specified. 3. CONSTRUCTION METHODS Frames, grates, rings and covers shall be constructed of the materials as specified and in accordance with the details shown on the plans, and shall be placed carefully to the lines and grades indicated on the plans or as directed by the Engineer. All welding shall conform to the requirements of the latest American Welding Society Specifications. Frames, grates, rings and covers shall be given one coat of a commercial grade red lead and oil paint and two coats of commercial grade aluminum paint. 055420 Page 1 of 2 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Painting on gray iron castings will not be required, except when used in conjunction with structural steel shapes. Commercial grade galvanized bolts and nuts shall be used. The zinc coating shall be uniform in thickness, smooth and continuous. 4. MEASUREMENT AND PAYMENT Unless otherwise specified on the Bid Form, frames, grates, rings and covers will not be measured for payment,but shall be considered subsidiary to other bid items. 055420 Page 2 of 2 Rev.3-25-2015 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 204 Item 204 ° Sprinkling �aTnspo nr of Transportation 1. DESCRIPTION Apply water for dust control,earthwork,or base construction. 2. MATERIALS Furnish water free of industrial wastes and other objectionable matter. 3. EQUIPMENT Use sprinklers and spray bars equipped with positive and rapidly working cut-off valves. 4. CONSTRUCTION Apply water at a uniform rate and in the required quantity,or as directed. 5. MEASUREMENT This Item will be measured by the 1,000 gal.applied. 6. PAYMENT Unless sprinkling is specified as a pay item,the work performed and materials furnished in accordance with this Item will not be paid for directly but will be subsidiary to pertinent Items. When sprinkling is specified on the plans as a pay item,the work performed and water furnished will be paid for at the unit price bid for"Sprinkling(Base),""Sprinkling(Earthwork),"or"Sprinkling(Dust Control)."This price is full compensation for furnishing and applying water;furnishing and operating sprinklers and measuring devices;and hauling,equipment, labor,fuel,materials,tools,and incidentals. 121 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 210 Item 210 ° Rolling ,Texas Department of Transportation 1. DESCRIPTION Compact embankment,subgrade,base,surface treatments,broken concrete pavement,or asphalt pavement using rollers. Break up asphalt mats,pit run material,or base materials. 2. EQUIPMENT Use any type of roller to meet the production rates and quality requirements of the Contract unless otherwise shown on the plans or directed. Use equipment that meets the requirements of this Item when specific types of equipment are required.The Engineer may allow the use of rollers that operate in one direction only when turning does not affect the quality of work or encroach on traffic. Table 1 Roller Requirements' Materials to be Load Roller Roller Type Compacted (tons) Contact Pressure Speed (mph) Embankment, >—325 Ib.per inch of Steel wheel subgrade,base, 10 wheel width 2-3 asphalt concrete Embankment, _ 125-550 psi per Tamping subgrade tamping foot 2-3 Heavy Embankment, _ >—550 psi per 2-3 tamping subgrade tamping foot Type A<6 Embankment, Type B>6 Per equipment Vibratory subgrade,base, Type C as specification and as As approved asphalt concrete shown on the approved plans Embankment, Light subgrade,surface 2-6 g pneumatic treatment 4.5-9.0 >_45 psi Asphalt Concrete 4-12 Embankment, 2-6 Medium subgrade,base, 12-25 >_80 psi,as directed pneumatic surface treatment Asphalt Concrete 4-12 Embankment, Heavy subgrade,base, pneumatic previously broken >_25 :5150 psi 2-6 concrete pavement, other pavements Embankment, Grid breaking up existing 5-13 — 2-3 asphalt mats or base 1. Unless otherwise specified in the Contract. 122 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 210 2.1. Static Steel Wheel Rollers. Furnish single,double,or triple steel wheel,self-propelled power rollers weighing at least 10 tons capable of operating in a forward and backward motion. Ensure all wheels are flat. The Contractor may use vibratory rollers in the static mode when static steel wheel rollers are required. For single steel wheel rollers,pneumatic rear wheels are allowed for embankment,subgrade,and base. Provide rear wheels for triple steel wheel rollers with a minimum diameter of 48 in.,a minimum width of 20 in.,and a minimum compression of 325 Ib.per inch of wheel width. 2.2. Tamping Rollers. Furnish self-propelled rollers with at least one self-cleaning metal tamping drum capable of operating in a forward or backward motion with a minimum effective rolling width of 5 ft. Mount drums in a frame so that each drum moves independently of the other for rollers with more than one drum.Operate rollers in static or vibratory mode. 2.2.1. Tamping Roller(Minimum Requirement). Provide tamping feet that exert a static load of 125 to 550 psi and project at least 3 in.from the surface of the drum for all tamping rollers except for heavy tamping rollers. 2.2.2. Heavy Tamping Roller. Provide tamping rollers that have: ■ 2 metal tamping drums,rolls,or shells,each with a 60-in.minimum diameter and a 5-ft.minimum width, or ■ 1 rear and 2 forward drums,each with a 60-in.minimum diameter.Arrange drums so that the rear drum compacts the space between the 2 forward drums and the minimum overall rolling width is 10 ft. Equip drums with tamping feet that: ■ project at least 7 in.from the drum surface, ■ have an area of 7 to 21 sq. in., ■ are self-cleaning, ■ exert a static load of at least 550 psi,and ■ are spaced at 1 tamping foot per 0.65 to 0.70 square feet of drum area. 2.3. Vibratory Rollers. Furnish self-propelled rollers with at least one drum equipped to vibrate.Select and maintain amplitude and frequency settings per manufacturer's specifications to deliver maximum compaction without material displacement or shoving,as approved. Furnish the equipment manufacturer's specifications concerning settings and controls for amplitude and frequency.Operate rollers at speeds that will produce at least 10 blows per foot unless otherwise shown on the plans or approved. Pneumatic rear wheels are allowed for embankment,subgrade,and base. Equip each vibrating drum with: ■ separate frequency and amplitude controls, ■ controls to manually start and stop vibration,and ■ a mechanism to continuously clean the face of the drum. For asphalt-stabilized base and asphalt concrete pavement,furnish a roller that also has the ability to: ■ automatically reverse the direction of the rotating eccentric weight, ■ stop vibration before the motion of the roller stops,and ■ thoroughly moisten the drum with water or approved asphalt release agent. 2.3.1. Drum(Type A). Furnish a roller with a static weight less than 6 tons and a vibratory drum. 2.3.2. Drum(Type B). Furnish a roller with a minimum static weight of 6 tons and a vibratory drum. 2.3.3. Drum(Type C). Furnish a roller as shown on the plans. 2.4. Pneumatic Tire Rollers. Pneumatic tire rollers consist of rubber tire wheels on axles mounted in a frame with either a loading platform or body suitable for ballast loading.Arrange the rear tires to cover the gaps between adjacent tires of the forward group. Furnish rollers capable of forward and backward motion. 123 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 210 Compact asphalt pavements and surface treatments with a roller equipped with smooth-tread tires.Compact without damaging the surface. Moisten the wheels with water or an approved asphalt release agent when necessary. Select and maintain the operating load and tire air pressure within the range of the manufacturer's charts or tabulations to attain maximum compaction throughout the lift,as approved. Furnish the manufacturer's chart or tabulations showing the contact areas and contact pressures for the full range of tire inflation pressures and for the full range of loadings for the particular tires furnished. Maintain individual tire inflation pressures within 5 psi of each other. Provide uniform compression under all tires. 2.4.1. Light Pneumatic Tire. Furnish a unit: ■ with at least 9 pneumatic tires, ■ with an effective rolling width of approximately 5 ft., ■ capable of providing a total uniform load of 4.5 to 9 tons,and ■ with tires capable of maintaining a minimum ground contact pressure of 45 psi. 2.4.2. Medium Pneumatic Tire. Furnish a unit: ■ with at least 7 pneumatic tires, ■ with an effective rolling width of approximately 7 ft., ■ capable of providing a total uniform load of 12 to 25 tons,and ■ with tires capable of maintaining a minimum ground contact pressure of 80 psi or 90 psi as directed. 2.4.3. Heavy Pneumatic Tire. Furnish a unit: ■ with at least 4 pneumatic-tired wheels mounted on axles carrying no more than 2 wheels, ■ with wheels arranged to carry approximately equal loads on uneven surfaces, ■ with a width between 8 and 10 ft.that can turn 180° in the crown width, ■ capable of providing a total uniform load of at least 25 tons, ■ with tires capable of maintaining a maximum ground contact pressure of 150 psi,and ■ with liquid-filled tires inflated to such a level that liquid will flow from the valve stem when the stem is in the uppermost position. 2.5. Grid Rollers. Furnish rollers that have 2 cylindrical cages with a minimum diameter of 66 in.and a minimum width of 32 in. Mount cages in a rigid frame with weight boxes. Use a cage surface of cast or welded steel fabric grid with bars 1-1/2 in.wide,spaced on 5-in.centers in each direction,that undulate approximately 1 in.between the high and low points. Furnish rollers capable of providing a total load of 5 to 13 tons and capable of being operated in a forward or backward motion. 2.6. Alternate Equipment.The Contractor may use alternate compaction equipment that produces results equivalent to the specified equipment as approved. Discontinue the use of the alternate equipment and furnish the specified equipment if the desired results are not achieved. 3. CONSTRUCTION Perform this work in accordance with the applicable Items using equipment and roller speeds specified in Table 1. Use only rubber-tired equipment to push or pull compaction equipment on base courses. Use equipment that does not damage material being rolled. 4. MEASUREMENT AND PAYMENT The work performed,materials furnished,equipment, labor,tools,and incidentals will not be measured or paid for directly but will be subsidiary to pertinent Items. 124 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 216 Item 216 ° Proof Rolling ,Texas Department of Transportation 1. DESCRIPTION Proof-roll earthwork,base,or both to locate unstable areas. 2. EQUIPMENT 2.1. Specified Equipment. Furnish rollers that weigh at least 25 tons when loaded.The maximum acceptable load is 50 tons. Provide rollers that meet the requirements of Section 210.2.4.,"Pneumatic Tire Rollers." 2.2. Alternative Equipment.The Contractor may use alternate compaction equipment that produces results equivalent to the specified equipment in the same period of time as approved. Discontinue the use of the alternative equipment and furnish the specified equipment if the desired results are not achieved. 3. CONSTRUCTION Perform proof rolling as directed.Adjust the load and tire inflation pressures within the range of the manufacturer's charts or tabulations,as directed. Make at least 2 coverages with the proof roller. Offset each trip of the roller by at most one tire width.Operate rollers at a speed between 2 and 6 mph,as directed. Correct unstable or nonuniform areas, if found,in accordance with the applicable Item. 4. MEASUREMENT Rolling will be measured by the hour operated on surfaces being tested. 5. PAYMENT The work performed and equipment furnished in accordance with this Item and measured as provided under "Measurement"will be paid for at the unit price bid for"Proof Rolling."This price is full compensation for furnishing and operating equipment and for labor,materials,tools,and incidentals. 125 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 502 Item 502 ° Barricades, Signs, and Traffic Handling Texas Department of Transportation 1. DESCRIPTION Provide,install,move,replace,maintain,clean,and remove all traffic control devices shown on the plans and as directed. 2. CONSTRUCTION Comply with the requirements of Article 7.2.1 "Safety." Implement the traffic control plan(TCP)shown on the plans. Install traffic control devices straight and plumb. Make changes to the TCP only as approved. Minor adjustments to meet field conditions are allowed. Submit Contractor-proposed TCP changes,signed and sealed by a licensed professional engineer,for approval.The Engineer may develop,sign,and seal Contractor-proposed changes.Changes must conform to guidelines established in the TMUTCD using approved products from the Department's Compliant Work Zone Traffic Control Device List. Maintain traffic control devices by taking corrective action when notified.Corrective actions include,but are not limited to,cleaning,replacing,straightening,covering,and removing devices. Maintain the devices such that they are properly positioned and spaced,legible,and have retroreflective characteristics that meet requirements day or night and in all weather conditions. The Engineer may authorize or direct in writing the removal or relocation of project limit advance warning signs.When project limit advance warning signs are removed before final acceptance, provide traffic control in accordance with the TMUTCD for minor operations as approved. Remove all traffic control devices upon completion of the work as shown on the plans or as directed. 3. MEASUREMENT Barricades,Signs,and Traffic Handling will be measured by the month. Law enforcement personnel with patrol vehicles will be measured by the hour for each person. 4. PAYMENT 4.1. Barricades,Signs,and Traffic Handling. Except for Contracts with callout work and work orders,the work performed and materials furnished in accordance with this Item and measured as provided under "Measurement"will be paid for at the unit price bid for"Barricades, Signs,and Traffic Handling."This price is full compensation for installation, maintenance,adjustments,replacements,removal,materials,equipment, labor,tools,and incidentals. The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement"will be paid for at the unit price bid for"Barricades, Signs,and Traffic Handling."This price is full compensation for installation,maintenance,adjustments,replacements,removal,materials,equipment, labor,tools,and incidentals. 703 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 502 When the plans establish pay items for particular work in the TCP,that work will be measured and paid under pertinent Items. 4.1.1. Initiation of Payment. Payment for this Item will begin on the first estimate after barricades,signs,and traffic handling devices have been installed in accordance with the TCP and construction has begun. 4.1.2. Paid Months. Monthly payment will be made each succeeding month for this Item provided the barricades, signs,and traffic handling devices have been installed and maintained in accordance with the TCP until the Contract amount has been paid. If,within the time frame established by the Engineer,the Contractor fails to provide or properly maintain signs and barricades in compliance with the Contract requirements,as determined by the Engineer,the Contractor will be considered in noncompliance with this Item. No payment will be made for the months in question,and the total final payment quantity will be reduced by the number of months the Contractor was in noncompliance. 4.1.3. Maximum Total Payment Before Acceptance.The total payment for this Item will not exceed 10%of the total Contract amount before final acceptance in accordance with Article 5.12.,"Final Acceptance."The remaining balance will be paid in accordance with Section 502.4.1.5.,"Balance Due." 4.1.4. Total Payment Quantity.The quantity paid under this Item will not exceed the total quantity shown on the plans except as modified by change order and as adjusted by Section 502.4.1.2.,"Paid Months."An overrun of the plans quantity for this Item will not be allowed for approving designs;testing;material shortages; closed construction seasons;curing periods;establishment,performance,test,and maintenance periods; failure to complete the work in the number of months allotted;nor delays caused directly or indirectly by requirements of the Contract. 4.1.5. Balance Due.The remaining unpaid months of barricades less non-compliance months will be paid on final acceptance of the project, if all work is complete and accepted in accordance with Article 5.12.,"Final Acceptance." 4.1.6. Contracts with Callout Work and Work Orders.The work performed and the materials furnished with this Item and measured as provided under"Measurement,"will be considered subsidiary to pertinent Items, except for federally funded Contracts. 4.2. Law Enforcement Personnel.The work performed and materials furnished in accordance with this Item and measured as provided under"Measurement,"will be paid by Contractor force account for"Law Enforcement Personnel."This price is full compensation for furnishing all labor, materials,supplies,equipment,patrol vehicle,fees,and incidentals necessary to complete the work as directed. 704 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 508 Item 508 ° Constructing Detours Texas Department of Transportation 1. DESCRIPTION Construct and maintain detours. Remove detours when required. 2. MATERIALS 2.1. Embankment. Use roadway excavation for embankment material or use material from other approved sources. 2.2. Temporary Drainage Pipe. Furnish pipe required for temporary drainage in accordance with details shown on the plans or as directed. Pipe will become the property of the Contractor upon removal. Temporary use of permanent pipe is allowable if the sequence of work permits. If pipe used temporarily is damaged so that it is not acceptable in accordance with applicable Items,it will not be acceptable for incorporation in the final project.The damaged pipe remains the property of the Contractor. 2.3. Base and Surfacing. Furnish base and surfacing materials in accordance with Items as shown on the plans. 3. CONSTRUCTION Construct the detour at the locations and to the lines,grades,and typical sections shown on the plans or as directed, in accordance with pertinent Items. Maintain detours for public travel in a safe and passable condition. Public traffic safety and convenience is essential. Maintain detours in accordance with Section 7.2.4.,"Public Safety and Convenience';Article 7.17.,"Contractor's Responsibility for Work';and this Item. Remove detours after they are no longer needed for traffic. Removed materials will become the property of the Contractor unless otherwise shown on the plans or directed. Dispose of the materials off the right of way, unless otherwise directed,in accordance with federal,state,and local requirements.If desired,dispose of materials by spreading along the adjacent roadway slopes if allowed.Salvage or stockpile in accordance with pertinent Items if embankment,base,or surfacing is to be reused within the roadway construction or stockpiled for future use. 4. MEASUREMENT This Item will be measured by the square yard of pavement area,or surface area if not paved. 5. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement"will be paid for at the unit price bid for"Constructing Detours,"for Constructing Detours by Type as shown on the plans,or for"Constructing Detours(EBSS)."Embankment Base Surface Separate (EBSS)is used when embankment,base,and surface are paid for separately. The price bid for"Constructing Detours"or for Constructing Detours by Type as shown on the plans is full compensation for furnishing all materials required,including embankment,base,and surfacing;excavation and hauling of excavated material;sprinkling and compacting;furnishing,installing,and removing drainage structures;removal of detour;disposal of materials;and equipment,labor,tools,and incidentals. 719 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 508 The price bid for"Construction Detours(EBSS)"is full compensation for furnishing, installing,and removing drainage structures;removal of detour;disposal of materials;and equipment,labor,tools,and incidentals, except that embankment,flexible base,and surfacing will be measured and paid for in accordance with other pertinent Items. Maintenance of detours constructed will not be paid for directly but will be subsidiary to this Item. Maintenance of pavement on detours that use existing pavement will be paid for in accordance with Article 7.17., "Contractor's Responsibility for Work." When the plans require the base and surfacing to be removed and incorporated in the final roadway or stockpiled after use on the detour,the work will be performed,measured,and paid for in accordance with the pertinent Items shown for salvaging,replacing,or stockpiling materials. All other items not specifically addressed in this Article will be paid for under pertinent Items unless otherwise shown on the plans. 720 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 510 Item 510 ° One-Way Traffic Control Texas Department of Transportation 1. DESCRIPTION Provide one-way traffic control using one of the methods shown on the plans. 2. WORK METHODS 2.1. Flagger Control Method. Furnish flaggers in accordance with the requirements of Article 7.2.,"Safety,"at all entry points to the work zone,to stop traffic. Furnish a Stop/Slow paddle that meets the requirements of the TMUTCD for each flagger. If desired,use Automated Flagger Assistance Devices if approved. 2.2. Pilot Car Method. Furnish a licensed driver and pilot vehicle with required signs attached. Furnish flaggers on each approach to the activity area to control traffic. Provide Stop/Slow paddles and signs that meet the requirements of the TMUTCD. Instruct drivers to follow the pilot vehicle and to not pass the cars ahead. 2.3. Portable Traffic Signal Method.Furnish,operate,and maintain new or used portable traffic signal units. Assure used units are in good working condition and are approved before use.A list of approved units can be found in the Department's Compliant Work Zone Traffic Control Device List. Units will remain the property of the Contractor. 3. MEASUREMENT When shown on the plans as a bid item,this Item will be measured as follows: 3.1. Flagger Control Method. By the actual number of hours flaggers are engaged in flagging activities. Each Flagger will be measured separately. 3.2. Pilot Car Method. By the actual number of hours of use for the combination of flaggers and pilot vehicle. 3.3. Portable Traffic Signal Method.By the month,including 2 units operated by a single controller set up and operational on the worksite. 4. PAYMENT Unless otherwise shown on the plans,the work performed and materials furnished in accordance with this Item will not be paid for directly but will be subsidiary to pertinent Items. When shown on the plans as a bid item,the work performed and materials furnished in accordance with this Item and measured as provided under"Measurement'will be paid for at the unit price bid for the method specified.This price is full compensation for furnishing and operating equipment,pilot car,pilot vehicle driver, flaggers,signs,labor,tools,and incidentals. Payment for Portable Traffic Signal units and Portable Traffic Signals will be full compensation for the units,set up,relocating,removing,replacing parts,batteries,fuel,oil, and incidentals. 721 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 512 Item 512 ° Portable Traffic Barrier Texas partment of Transportation 1. DESCRIPTION Furnish, install, move,and remove portable traffic barrier. 2. MATERIALS 2.1. Furnished by the Contractor. 2.1.1. Concrete. Furnish barrier of the class of concrete shown and using materials that meet the pertinent requirements of the following Items: ■ Item 420,"Concrete Substructures" ■ Item 421,"Hydraulic Cement Concrete" ■ Item 424,"Precast Concrete Structural Members(Fabrication)" ■ Item 440,"Reinforcement for Concrete" ■ Item 442,"Metal for Structures" 2.1.2. Steel. Barrier sections will be furnished when shown on the plans. Barrier sections must meet the crash testing requirements of NCHRP 350 or MASH TL-3 or TL-4 specifications as per test matrix for Longitudinal Barriers. 2.1.3. Concrete and Steel.When barrier is to be furnished and retained by the Contractor,products from nonapproved sources or previously used products may be provided if the Contractor submits written certification that the barrier sections and materials substantially conform to the requirements of this Item.The Engineer may approve the use of the product if: ■ the barrier sections substantially meet typical cross-section dimension requirements, ■ there is no evidence of structural damage such as major spalls or cracks, ■ the general condition of both the barrier sections and their connectors is acceptable, ■ the barrier is new,and ■ the barrier is being reused. 2.2. Furnished by the Department.Department-furnished barrier sections will be at a stockpile location or an existing traffic barrier installation shown on the plans. 3. CONSTRUCTION Notify the Engineer of the location of the casting site and the date on which the work will begin. Multi-project fabrication plants as defined in Item 424,"Precast Concrete Structural Members(Fabrication),"that produce concrete traffic barrier,except temporary barrier furnished and retained by the Contractor,must be qualified in accordance with DMS-7350,"Qualification Procedure for Multi-Project Fabrication Plants of Precast Concrete Traffic Barrier."See the Departments MPL for approved fabricators.Construct barrier in accordance with Item 420, "Concrete Substructures,"to the dimensions and cross-sections shown on the plans. Provide forms and cure concrete in accordance with Item 424,"Precast Concrete Structural Members (Fabrication)." Provide a rough texture to the bottom surface of Single Slope or F-Shape barriers and to the top of Low Profile barriers similar to a wood float finish. 722 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 512 Remove formwork after the concrete has reached sufficient strength to prevent physical damage to the member. Move barrier sections to a storage area and place them on blocking to prevent damage when they have attained sufficient strength to permit handling without causing visible damage. Produce precast barrier to the tolerances given in Table 1 unless otherwise shown on the plans. Table 1 Precast Barrier Tolerances Dimension Tolerance Length ±1 in. Insert Placement ±1/2 in. Horizontal Alignment ±1/8 in.per 10 feet of length Deviation of Ends: Horizontal Skew ±1/4 in. Vertical Batter ±1/8 in.per foot of depth Install the barrier sections in accordance with the details shown on the plans or as directed. After use,stockpile barrier sections and connection hardware that are to be retained by the Department at the location shown on the plans or as otherwise directed. Obtain assembly and installation information for the portable steel traffic barrier from the manufacturer,and provide the Engineer with an installation and repair manual specific to the portable steel traffic barrier. Repair or replace all traffic barrier or connecting hardware damaged by the Contractor's operations at the Contractor's expense. Repair or replace any pavement damaged in the process of installing,moving,or removing barrier sections at the Contractor's expense. 4. MEASUREMENT This Item will be measured by the foot based on the nominal lengths of the barrier sections. 5. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement"will be paid for at the unit price as follows: ■ For concrete barrier only,bid for"Portable Traffic Barrier"of the work category(Furnish and Install, Designated Source, Move,Stockpile,or Remove),shape(e.g.,Single Slope, F-Shape,or Low Profile) and Type(1,2,3,etc.)of barrier sections specified.This price includes equipment,labor,tools,and incidentals. ■ For concrete and steel barrier,bid for"Portable Traffic Barrier"of the work category(Furnish and Install, Designated Source, Move, Stockpile,or Remove),shape(e.g.,Single Slope, F-Shape,or Low Profile) and Type(1,2,3,etc.)of barrier sections specified or"Steel".This price includes equipment,labor, tools,and incidentals. 5.1. Furnish and Install.This price is full compensation for furnishing and installing barrier sections and connection hardware. 5.2. Designated Source.This price is full compensation for delivering and installing Department-furnished barrier sections and connection hardware from a designated source. 5.3. Move.This price is full compensation for moving barrier section installations on the project from one location to another(including disassembly and reassembly costs),moving barrier sections from an installation on the project to a temporary storage area(including disassembly costs),and moving barrier sections from a temporary storage area to an installation site on the project(including assembly costs). 723 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 512 5.4. Stockpile.This price is full compensation for removing barrier sections and connection hardware from the project and delivering to the Department stockpile area shown on the plans or as directed. 5.5. Remove.This price is full compensation for removing barrier and connection hardware from the project and retained by the Contractor. 724 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 636 Item 636 ° Signs ,Texas Department of Transportation 1. DESCRIPTION ■ Installation. Furnish,fabricate,and erect aluminum signs.Sign supports are provided for under other Items. ■ Replacement. Replace existing signs on existing sign supports. ■ Refurbishing. Refurbish existing aluminum signs on existing sign supports. 2. MATERIALS 2.1. Sign Blanks. Furnish sign blank substrates in accordance with DMS-7110,"Aluminum Sign Blanks,"and in accordance with the types shown on the plans. Use single-piece sheet-aluminum substrates for Type A (small)signs and extruded aluminum substrates for Type G(ground-mounted)or Type 0(overhead- mounted)signs. 2.2. Sign Face Retroreflectorization. Retroreflectorize the sign faces with flat surface reflective sheeting. Furnish sheeting that meets DMS-8300,"Sign Face Materials." Use retroreflective sheeting from the same manufacturer for the entire sign face background. Ensure that sign legend,symbols,borders,and background exhibit uniform color,appearance,and retroreflectivity when viewed both day and night. 2.3. Sign Messages. Fabricate sign messages to the sizes,types,and colors shown on the plans. Use sign message material from the same manufacturer for the entire message of a sign. Use screen ink and background reflective sheeting that are from the same manufacturer when fabricating signs. ■ Ensure that the screened messages have clean,sharp edges and exhibit uniform color and retroreflectivity. Prevent runs,sags,and voids. Furnish screen inks in accordance with DMS-8300,"Sign Face Materials." ■ Fabricate colored,transparent film legend,and retroreflectorized sheeting legend from materials that meet DMS-8300,"Sign Face Materials." ■ Fabricate non-reflective black film legend from materials meeting DMS-8300,"Sign Face Materials." ■ Furnish direct-applied route markers and other attachments within the parent sign face unless otherwise specified on the plans. 2.4. Hardware. Use galvanized steel,stainless steel,or dichromate-sealed aluminum for bolts,nuts,washers, lock washers,screws,and other sign assembly hardware. Use plastic or nylon washers to avoid tearing the reflective sheeting. Furnish steel or aluminum products in accordance with DMS-7120,"Sign Hardware." When dissimilar metals are used,select or insulate metals to prevent corrosion. 3. CONSTRUCTION 3.1. Fabrication.Sign fabrication plants that produce permanent highway signs must be approved in accordance with DMS-7390,"Permanent Highway Sign Fabrication Plant Qualification."Furnish signs from prequalified fabrication plants listed in the Department's MPL. 3.1.1. Sign Blanks. Furnish sign blanks to the sizes and shapes shown on the plans and that are free of buckles, warps,burrs,dents,cockles,or other defects. Do not splice individual extruded aluminum panels. 797 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 636 Complete the fabrication of sign blanks,including the cutting and drilling or punching of holes,before cleaning and degreasing.After cleaning and degreasing,ensure the substrate does not come into contact with grease,oils,or other contaminants before the application of the reflective sheeting. 3.1.2. Sheeting Application.Apply sheeting to sign blanks in conformance with the sheeting manufacturer's recommended procedures. When using rotational sensitive white sheeting,fabricate signs by applying the sheeting for cut-out legend, symbols,borders,and route marker attachments within the parent sign face with the identification marks or other orientation features in the optimum rotation as identified by the sheeting manufacturer. Clean and prepare the outside surface of extruded aluminum flanges in the same manner as the sign panel face. Minimize the number of splices in the sheeting.Overlap the lap-splices by at least 1/4 in.for encapsulated glass bead sheeting unless otherwise recommended by the reflective sheeting manufacturer. Use butt splices for prismatic reflective sheeting. Provide a 1 ft.minimum dimension for any piece of sheeting. Do not splice sheeting for signs fabricated with transparent screen inks or colored transparent films. 3.1.3. Sign Assembly.Assemble extruded aluminum signs in accordance with the details shown on the plans. Sign face surface variation must not exceed 1/8 in.per foot.Surface misalignment between panels in multi- panel signs must not exceed 1/16 in.at any point. 3.1.4. Decals.Code and apply sign identification decals in accordance with Item 643,"Sign Identification Decals." 3.2. Storage and Handling.Ship,handle,and store completed sign blanks and completed signs so that corners, edges,and faces are not damaged. Damage to the sign face that is not visible when viewed at a distance of 50 ft.,night or day,will be acceptable. Replace unacceptable signs. Store all finished signs off the ground and in a vertical position until erected.Store finished sheet aluminum substrate signs in a weatherproof building. Extruded aluminum substrate signs may be stored outside. Stockpile salvageable materials at the location shown on the plans or as directed.Accept ownership of unsalvageable materials and dispose of them in accordance with federal,state,and local regulations. 3.3. Cleaning.Wash completed signs in the fabrication shop with a biodegradable cleaning solution acceptable to the manufacturers of the sheeting,colored transparent film,and screen ink to remove grease,oil,dirt, smears,streaks,finger marks,and other foreign material.Wash again before final inspection after erection. 3.4. Installation. Install signs as shown on the plans or as directed. 3.5. Replacement. Remove the existing signs from the existing supports and replace with new signs, including mounting hardware,as shown on the plans. 3.6. Refurbishing. Refurbish existing signs by providing and installing new messages and mounting hardware. Install new retroreflectorized legend and supplemental signs as shown on the plans. 3.7. Documentation. Provide the following documentation from the sign fabricator with each shipment of furnished signs: ■ A notarized original of the Signing Material Statement(Form 2273)with the proper attachments for verification of compliance,and ■ A notarized certification stating that the completed signs were fabricated in accordance with this Item and the plans. 798 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 636 4. MEASUREMENT Signs installed or replaced will be measured by the square foot of the sign face.Signs refurbished will be measured by each sign. This is a plans quantity measurement Item.The quantity to be paid is the quantity shown in the proposal, unless modified by Article 9.2.,"Plans Quantity Measurement."Additional measurements or calculations will be made if adjustments of quantities are required. 5. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement"will be paid for at the unit price bid for"Aluminum Signs,""Replacing Existing Aluminum Signs,"or"Refurbishing Aluminum Signs,"of the type specified. 5.1. Installation.This price is full compensation for furnishing and installing new signs and hardware;fabrication of sign panels;treatment of sign panels required before application of the background materials;application of the background materials and messages to the sign panels;furnishing and fabricating frames,wind beams and stiffeners;furnishing bolts,rivets,screws,fasteners,clamps,brackets,and sign support connections; assembling and erecting the signs;preparing and cleaning the signs;and materials,equipment,labor,tools, and incidentals. 5.2. Replacement.This price is full compensation for furnishing and installing new aluminum signs and hardware;removal of existing signs;fabrication of sign panels;treatment of sign panels required before application of the background materials;application of the background materials and messages to the sign panels;furnishing and fabricating frames,wind beams and stiffeners;furnishing bolts,rivets,screws, fasteners,clamps,brackets,and sign support connections;assembling and erecting the signs;preparing and cleaning the signs;salvaging and disposing of unsalvageable materials;and materials,equipment,labor, tools,and incidentals. 5.3. Refurbishing.This price is full compensation for modifying existing sign messages;removing and replacing existing route markers,reflectorized legend,or supplemental signs attached to the parent sign;preparing and cleaning the signs;furnishing sheeting and hardware;salvaging and disposing of unsalvageable materials; and materials,equipment,labor,tools,and incidentals. 799 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 644 Item 644 ° Small Roadside Sign Assemblies Texas Department of Transportation 1. DESCRIPTION ■ Installation. Furnish,fabricate,and erect small roadside sign assemblies or bridge mounted clearance sign assemblies consisting of the signs,sign supports,foundations(when required),and associated mounting hardware. ■ Relocation. Relocate existing small roadside sign assemblies or bridge mounted clearance sign assemblies,and furnish and fabricate material as required. ■ Removal. Remove existing small roadside sign assemblies or bridge mounted clearance sign assemblies. 2. MATERIALS Furnish all materials unless otherwise shown on the plans. Furnish only new materials. Furnish and fabricate materials that comply with the following Items and details shown on the plans: ■ Item 421,"Hydraulic Cement Concrete" ■ Item 440,"Reinforcement for Concrete" ■ Item 441,"Steel Structures" ■ Item 442,"Metal for Structures" ■ Item 445,"Galvanizing" ■ Item 636,"Signs" ■ Item 643,"Sign Identification Decals" ■ Item 656,"Foundations for Traffic Control Devices" Use galvanized steel,stainless steel,dichromate sealed aluminum,or other materials shown on the plans for pipe,bolts,nuts,washers,lock washers,screws,and other sign assembly hardware.When dissimilar metals are used,select or insulate metals to prevent corrosion. 3. CONSTRUCTION Construct foundations in accordance with Item 656,"Foundations for Traffic Control Devices."Plumb sign supports. Do not spring or rake posts to secure proper alignment. Use established safety practices when working near underground or overhead utilities.Consult the appropriate utility company before beginning work. 3.1. Fabrication. Fabricate sign supports in accordance with Item 441, "Steel Structures."Ensure all components fit properly. Verify the length of each post for each sign before fabrication to meet field conditions and sign-mounting heights shown on the plans. Hot-dip galvanize fabricated parts in accordance with Item 445,"Galvanizing."Punch or drill any holes in steel parts or members before galvanizing. Repair galvanizing for any steel part or member damaged during assembly,transit,erection;or for any steel part or member welded,when permitted,after galvanizing. Perform all galvanizing repairs in accordance with Section 445.3.5.,"Repairs." 802 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 644 3.2. Installation. Locate and install sign supports as shown on the plans,unless directed to shift the sign supports within design guidelines to secure a more desirable location or avoid conflict with utilities and underground appurtenances.Stake sign support locations for verification by the Engineer. Install stub posts of the type,spacing,orientation,and projection shown on the plans. Remove and replace posts damaged during installation at the Contractor's expense. Connect the upper post sections to the stub post sections as shown on the plans.Torque connection bolts as shown on the plans. Attach signs to supports in accordance with the plans and pertinent Items. 3.3. Relocation. Reuse the existing signs as required unless otherwise shown on the plans. Furnish and install new stub posts in new foundations for relocated sign assemblies. Erect the new supports on the new stub posts,and attach the existing signs to the supports in accordance with the plans and pertinent Items. Remove existing foundations to be abandoned in accordance with Section 644.3.4.,"Removal." 3.4. Removal. Remove abandoned concrete foundations to 2 ft.below finish grade unless otherwise shown on the plans.Cut off and remove steel protruding from the remaining concrete. Backfill the remaining hole with material equal in composition and density to the surrounding area. Replace any surfacing with like material to equivalent condition. 3.5. Handling and Storage. Handle and store existing signs or portions of signs removed so they are not damaged. Prevent any damage to the various sign assembly components. Replace any portion of the sign damaged by the Contractor designated for reuse or salvage,including messages removed. Stockpile all removed sign components that will be reused or become the property of the Department at designated locations.Accept ownership of unsalvageable materials,and dispose of them in accordance with federal,state,and local regulations. 3.6. Cleaning.Wash the entire sign after installation with a biodegradable cleaning solution acceptable to the sign face materials manufacturer to remove dirt,grease,oil smears,streaks,finger marks,and other foreign materials. 4. MEASUREMENT This Item will be measured as each small roadside assembly or bridge mounted clearance sign assembly installed,removed,or relocated. 5. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement"will be paid for at the unit price bid for"Install Small Roadside Sign Assemblies"of the type specified, "Install Bridge Mounted Clearance Sign Assemblies"of the type specified, "Relocate Small Roadside Sign Assemblies"of the type specified,"Relocate Bridge Mounted Clearance Sign Assemblies"of the type specified, "Remove Small Roadside Sign Assemblies,"or"Remove Bridge Mounted Clearance Sign Assemblies." 5.1. Installation.This price is full compensation for furnishing,fabricating,galvanizing,and erecting the supports; constructing foundations including concrete(when required);furnishing complete signs including sign connections and all hardware;attaching the signs to the supports;preparing and cleaning the signs;and materials,equipment,labor,tools,and incidentals. 5.2. Relocation.This price is full compensation for removing existing sign assemblies and related materials; furnishing and installing new stub posts and new sign supports;constructing foundations including concrete (when required);and new hardware;reinstallation of signs;preparing and cleaning the signs;salvaging; 803 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 644 disposal of unsalvageable materials;removing existing foundations,backfilling,and surface placement;and materials,equipment, labor,tools,and incidentals. 5.3. Removal.This price is full compensation for removing existing sign assemblies and related materials; salvaging;disposal of unsalvageable materials;removing existing foundations,backfilling,and surface placement;and materials,equipment,labor,tools,and incidentals. 804 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 662 Item 662 ° Texas Work Zone Pavement Markings �pspo":" of Transportation 1. DESCRIPTION Furnish,place,and maintain work zone pavement markings. 2. MATERIALS Provide thermoplastic,paint and beads,raised pavement markers(RPMs),prefabricated pavement markings,temporary flexible reflective roadway marker tabs,or other approved materials for work zone pavement markings. Supply materials meeting: ■ DMS-4200,"Pavement Markers(Reflectorized)," ■ DMS-4300,"Traffic Buttons," ■ DMS-8200,"Traffic Paint," ■ DMS-8220,"Hot Applied Thermoplastic," ■ DMS-8240,"Permanent Prefabricated Pavement Markings," ■ DMS-8241,"Temporary(Removable) Prefabricated Pavement Markings," ■ DMS-8242,"Temporary Flexible, Reflective Roadway Marker Tabs,"and ■ DMS-8290,"Glass Traffic Beads." 2.1. Nonremovable Markings. Use hot-applied thermoplastic or permanent prefabricated pavement markings for nonremovable markings. Paint and beads or other materials are not allowed for nonremovable markings unless shown on the plans. 2.2. Removable and Short-Term Markings. Use RPMs,removable prefabricated pavement markings, temporary flexible reflective roadway marker tabs,or other approved materials for removable and short-term markings. Do not use hot-applied thermoplastic or traffic paint for removable markings. Use removable prefabricated pavement markings on the final pavement surface when the plans specify removable markings. 3. CONSTRUCTION Apply pavement markings in accordance with the following Items. ■ Item 666,"Retroreflectorized Pavement Markings" ■ Item 668,"Prefabricated Pavement Markings" ■ Item 672,"Raised Pavement Markers" 3.1. Placement. Install longitudinal markings on pavement surfaces before opening to traffic. Maintain lane alignment traffic control devices and operations until markings are installed. Install markings in proper alignment in accordance with the TMUTCD and as shown on the plans.Short-term markings will be allowed when standard markings(removable or nonremovable)cannot be placed before opening to traffic, if shown on the plans or directed. When short-term markings are allowed for opening to traffic,place standard longitudinal markings no later than 14 calendar days after the placement of the surface.When inclement weather prohibits placement of markings,the 14-day period may be extended until weather permits proper application. 818 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 662 Place standard longitudinal markings no sooner than 3 calendar days after the placement of a surface treatment,unless otherwise shown on the plans. Apply thermoplastic markings to a minimum thickness of 0.060 in. (60 mils).When paint and beads are allowed,apply to a minimum dry thickness of 0.012 in.(12 mils). Place short-term markings in proper alignment with the location of the final pavement markings. Remove and replace short-term markings not in alignment at the Contractor's expense. For removable placements, use of RPMs to simulate longitudinal markings is at the Contractor's option. Use side-by-side RPMs to simulate longitudinal lines wider than 4 in. Do not use RPMs for words,symbols, shapes,or diagonal or transverse lines. 3.2. Marking Removal. Remove markings that conflict with succeeding markings in accordance with Item 677, "Eliminating Existing Pavement Markings and Markers." Remove short-term markings that interfere or conflict with final marking placement immediately before placing final pavement markings,unless otherwise directed. Remove the remainder of the short-term markings before final acceptance. Remove all temporary markings with minimal damage to the roadway to the satisfaction of the Engineer. 3.3. Performance Requirements. Ensure all markings are visible from a distance at least 300 ft.in daylight conditions and at least 160 ft. in nighttime conditions when illuminated by automobile low-beam headlights. Determine visibility distances using an automobile traveling on the roadway under dry conditions. Maintain the markings for 30 calendar days after installation.The end of the 30-day maintenance period does not relieve the Contractor from the performance deficiencies requiring corrective action identified during the 30-day period. Remove and replace markings at the Contractor's expense if they fail to meet the requirements of this Item during the 30-day period.The 30-calendar day performance requirement will begin again after replacement of the markings. Ensure daytime and nighttime reflected color of the markings are distinctly white or yellow. Ensure markings exhibit uniform retroreflective characteristics. 4. MEASUREMENT This Item will be measured by the foot or each word,shape,symbol,or temporary flexible reflective roadway marker tab. Each stripe will be measured separately.RPMs used to simulate a marking will be measured by the foot of marking or each RPM. This is a plans quantity measurement Item.The quantity to be paid is the quantity shown in the proposal, unless modified by Article 9.2.,"Plans Quantity Measurement."Additional measurements or calculations will be made if adjustments of quantities are required. 5. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement"will be paid for at the unit price bid for"Work Zone Pavement Markings"of the type and color specified and the shape,width,and size specified as applicable.This price is full compensation for furnishing,placing,maintaining,and removing work zone pavement markings and for materials,equipment, labor,tools,and incidentals. 819 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 662 Elimination of nonremovable markings will be paid for under Item 677,"Eliminating Existing Pavement Markings and Markers." Removal of short-term and removable markings will not be paid for directly but will be subsidiary to this Item. Type II work zone pavement markings(paint and beads)used as a sealer for Type I pavement markings (thermoplastic)will be paid for under this Item. 820 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 666 Item 666 ° Retroreflectorized Pavement Markings Texas Department of Transportation 1. DESCRIPTION Furnish and place retroreflectorized,non-retroreflectorized (shadow)and profile pavement markings. 2. MATERIALS 2.1. Type I Marking Materials. Furnish in accordance with DMS-8220, "Hot Applied Thermoplastic." Furnish pavement marking material used for Type I profile markings and shadow markings that have been approved by the Construction Division,and in accordance with DMS-8220,"Hot Applied Thermoplastic." 2.2. Type II Marking Materials. Furnish in accordance with DMS-8200,"Traffic Paint." 2.3. Glass Traffic Beads. Furnish drop-on glass beads in accordance with DMS-8290, "Glass Traffic Beads"or as approved. Furnish a double-drop of Type 11 and Type III drop-on glass beads where each type bead is applied separately in equal portions(by weight),unless otherwise approved.Apply the Type III beads before applying the Type 11 beads. 2.4. Labeling. Use clearly marked containers that indicate color,mass,material type,manufacturer,and batch number. 3. EQUIPMENT 3.1. General Requirements. Use equipment that: ■ is maintained in satisfactory condition, ■ meets or exceeds the requirements of the National Board of Fire Underwriters and the Texas Railroad Commission for this application, ■ applies beads by an automatic bead dispenser attached to the pavement marking equipment in such a manner that the beads are dispensed uniformly and almost instantly upon the marking as the marking is being applied to the road surface.The bead dispenser must have an automatic cut-off control, synchronized with the cut-off of the pavement marking equipment, ■ has an automatic cut-off device with manual operating capabilities to provide clean,square marking ends, ■ is capable of producing the types and shapes of profiles specified,and ■ can provide continuous mixing and agitation of the pavement marking material.The use of pans,aprons, or similar appliances which the die overruns will not be permitted for longitudinal striping applications. Provide a hand-held thermometer capable of measuring the temperature of the marking material when applying Type I material. When pavement markings are required to meet minimum retroreflectivity requirements on the plans: ■ Use a mobile retroreflectometer approved by the Construction Division and certified by the Texas A&M Transportation Institute Mobile Retroreflectometer Certification Program. ■ Use a portable retroreflectometer that: • uses 30-meter geometry and meets the requirements described in ASTM E1710; • has either an internal global positioning system(GPS)or the ability to be linked with an external GPS with a minimum accuracy rating of 16 ft.5 in.,in accordance with the circular error probability 821 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 666 (CEP)method(CEP is the radius of the circle with its origin at a known position that encompasses 50%of the readings returned from the GPS instrument); • can record and print the GPS location and retroreflectivity reading for each location where readings are taken. 3.2. Material Placement Requirements. Use equipment that can place: ■ at least 40,000 ft.of 4-in.solid or broken non-profile markings per working day at the specified thickness; ■ at least 15,000 ft.of solid or broken profile pavement markings per working day at the specified thickness; ■ linear non-profile markings up to 8 in.wide in a single pass; ■ non-profile pavement markings other than solid or broken lines at an approved production rate; ■ a centerline and no-passing barrier-line configuration consisting of 1 broken line and 2 solid lines at the same time to the alignment,spacing,and thickness for non-profile pavement markings shown on the plans; ■ solid and broken lines simultaneously; ■ white line from both sides; ■ lines with clean edges,uniform cross-section with a tolerance of±1/8 in.per 4 in.width,uniform thickness,and reasonably square ends; ■ skip lines between 10 and 10-1/2 ft.,a stripe-to-gap ratio of 10 to 30,and a stripe-gap cycle between 39-1/2 ft.and 40-1/2 ft.,automatically; ■ beads uniformly and almost instantly on the marking as the marking is being applied; ■ beads uniformly during the application of all lines(each line must have an equivalent bead yield rate and embedment);and ■ double-drop bead applications using both Type II and Type II I beads from separate independent bead applicators,unless otherwise approved by the Engineer. 4. CONSTRUCTION Place markings before opening to traffic unless short-term or work zone markings are allowed. 4.1. General.Obtain approval for the sequence of work and estimated daily production. Minimize interference to roadway operations when placing markings on roadways open to traffic. Use traffic control as shown on the plans or as approved. Protect all markings placed under open-traffic conditions from traffic damage and disfigurement. Establish guides to mark the lateral location of pavement markings as shown on the plans or as directed,and have guide locations verified. Use material for guides that will not leave a permanent mark on the roadway. Apply markings on pavement that is completely dry and passes the following tests: ■ Type I Marking Application—Place a sample of Type I marking material on a piece of tarpaper placed on the pavement.Allow the material to cool to ambient temperature,and then inspect the underside of the tarpaper in contact with the pavement. Pavement will be considered dry if there is no condensation on the tarpaper. ■ Type 11 Marking Application—Place a 1-sq.ft.piece of clear plastic on the pavement,and weight down the edges.The pavement is considered dry if,when inspected after 15 min.,no condensation has occurred on the underside of the plastic. Apply markings: ■ that meet the requirements of Tex-828-13, 822 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 666 ■ that meet minimum retroreflectivity requirements when specified on the plans(applies to Type I markings only), ■ using widths and colors shown on the plans, ■ at locations shown on the plans, ■ in proper alignment with the guides without deviating from the alignment more than 1 in.per 200 ft.of roadway or more than 2 in.maximum, ■ without abrupt deviations, ■ free of blisters and with no more than 5%by area of holes or voids, ■ with uniform cross-section,density and thickness, ■ with clean and reasonably square ends, ■ that are retroreflectorized with drop-on glass beads,and ■ using personnel skilled and experienced with installation of pavement markings. Remove all applied markings that are not in alignment or sequence as stated on the plans,or in the specifications,at the Contractor's expense in accordance with Item 677,"Eliminating Existing Pavement Markings and Markers,"except for measurement and payment. 4.2. Surface Preparation. Prepare surfaces in accordance with this Section unless otherwise shown on the plans. 4.2.1. Cleaning for New Asphalt Surfaces and Retracing of All Surfaces.Air blast or broom the pavement surface for new asphalt surfaces(less than 3 years old)and for retracing of all surfaces to remove loose material,unless otherwise shown on the plans.A sealer for Type I markings is not required unless otherwise shown on the plans. 4.2.2. Cleaning for Old Asphalt and Concrete Surfaces(Excludes Retracing).Clean old asphalt surfaces (more than 3 years old)and all concrete surfaces in accordance with Item 678,"Pavement Surface Preparation for Markings,"to remove curing membrane,dirt,grease, loose and flaking existing construction markings,and other forms of contamination. 4.2.3. Sealer for Type I Markings.Apply a pavement sealer to old asphalt surfaces(more than 3 years old)and to all concrete surfaces before placing Type I markings on locations that do not have existing markings,unless otherwise approved.The pavement sealer may be either a Type 11 marking or an acrylic or epoxy sealer as recommended by the Type I marking manufacturer unless otherwise shown on the plans. Follow the manufacturer's directions for application of acrylic or epoxy sealers. Clean sealer that becomes dirty after placement by washing or in accordance with Section 666.4.2.1., "Cleaning for New Asphalt Surfaces and Retracing of All Surfaces,"as directed. Place the sealer in the same configuration and color(unless clear)as the Type I markings unless otherwise shown on the plans. 4.3. Application.Apply markings during good weather unless otherwise directed. If markings are placed at Contractor option when inclement weather is impending and the markings are damaged by subsequent precipitation,the Contractor is responsible for all required replacement costs. 4.3.1. Type I Markings. Place the Type I marking after the sealer cures.Apply within the temperature limits recommended by the material manufacturer. Flush the spray head if spray application operations cease for 5 min or longer by spraying marking material into a pan or similar container until the material being applied is at the recommended temperature. Apply on clean,dry pavements passing the moisture test described in Section 666.4.1.,"General,"and with a surface temperature above 50°F when measured in accordance with Tex-829-13. 4.3.1.1. Non-Profile Pavement Markings.Apply Type I non-profile markings with a minimum thickness of: ■ 0.100 in.(100 mils)for new markings and retracing water-based markings on surface treatments involving Item 316, "Seal Coat," 823 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 666 ■ 0.060 in.(60 mils)for retracing on thermoplastic pavement markings,or ■ 0.090 in.(90 mils)for all other Type I markings. The maximum thickness for Type I non-profile markings is 0.180 in.(180 mils). Measure thickness for markings in accordance with Tex-854-13 using the tape method. 4.3.1.2. Profile Pavement Markings.Apply Type I profile markings with a minimum thickness of: ■ 0.060 in.(60 mil)for edgeline markings,or ■ 0.090 in.(90 mil)for gore and centerline/no-passing barrier line markings. In addition,at a longitudinal spacing indicated on the plans,the markings must be profiled in a vertical manner such that the profile is transverse to the longitudinal marking direction.The profile must not be less than 0.30 in.(300 mil)nor greater than 0.50 in.(500 mil)in height when measured above the normal top surface plane of the roadway.The transverse width of the profile must not be less than 3.25 in.,and the longitudinal width not less than 1 in.,when measured at the top surface plane of the profile bar.The profile may be either a 1 or 2 transverse bar profile.When the 2 transverse bar profile is used,the spacing between the bases of the profile bars must not exceed 0.50 in.The above transverse bar width is for each 4 in.of line width. 4.3.2. Type II Markings.Apply on surfaces with a minimum surface temperature of 50°F.Apply at least 20 gal.per mile on concrete and asphalt surfaces and at least 22 gal.per mile on surface treatments for a solid 4-in. line.Adjust application rates proportionally for other widths.When Type 11 markings are used as a sealer for Type I markings,apply at least 15 gal.per mile using Type 11 drop-on beads. 4.3.3. Bead Coverage. Provide a uniform distribution of beads across the surface of the stripe for Type I and Type 11 markings,with 40%to 60%bead embedment. 4.4. Retroreflectivity Requirements.When specified on the plans,Type I markings must meet the following minimum retroreflectivity values for edgeline markings,centerline or no passing barrier-line,and lane lines when measured any time after 3 days,but not later than 10 days after application: ■ White markings:250 millicandelas per square meter per lux(mcd/m2/Ix) ■ Yellow markings: 175 mcd/m2/Ix 4.5. Retroreflectivity Measurements. Use a mobile retroreflectometer for projects requiring minimum retroreflectivity requirements to measure retroreflectivity for Contracts totaling more than 200,000 ft.of pavement markings,unless otherwise shown on the plans. For Contracts with less than 200,000 ft.of pavement markings or Contracts with callout work,mobile or portable retroreflectometers may be used at the Contractor's discretion. 4.5.1. Mobile Retroreflectometer Measurements. Provide mobile measurements averages for every 0.1 miles unless otherwise specified or approved.Take measurements on each section of roadway for each series of markings(i.e.,edgeline,center skip line,each line of a double line,etc.)and for each direction of traffic flow. Measure each line in both directions for centerlines on two-way roadways(i.e.,measure both double solid lines in both directions and measure all center skip lines in both directions). Furnish measurements in compliance with Special Specification,"Mobile Retroreflectivity Data Collection for Pavement Markings," unless otherwise approved.The Engineer may require an occasional field comparison check with a portable retroreflectometer meeting the requirements listed above to ensure accuracy. Use all equipment in accordance with the manufacturer's recommendations and directions. Inform the Engineer at least 24 hr.before taking any measurements. A marking meets the retroreflectivity requirements if: ■ the combined average retroreflectivity measurement for a one-mile segment meets the minimum retroreflectivity values specified,and ■ no more than 30%of the retroreflectivity measurement values are below the minimum retroreflectivity requirements value within the one-mile segment. 824 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 666 The Engineer may accept failing one-mile segments if no more than 20%of the retroreflectivity measurements within that mile segment are below the minimum retroreflectivity requirement value. The one-mile segment will start from the beginning of the data collection and end after a mile worth of measurements have been taken;each subsequent mile of measurements will be a new segment. Centerlines with 2 stripes(either solid or broken)will result in 2 miles of data for each mile segment. Each centerline stripe must be tested for compliance as a stand-alone stripe. Restripe at the Contractor's expense with a minimum of 0.060 in.(60 mils)of Type I marking if the marking fails retroreflectivity requirements.Take measurements every 0.1 miles a minimum of 10 days after this second application within that mile segment for that series of markings. If the markings do not meet minimum retroreflectivity after 10 days of this second application,the Engineer may require removal of all existing markings,a new application as initially specified,and a repeat of the application process until minimum retroreflectivity requirements are met. 4.5.2. Portable Retroreflectometer Measurements.Take a minimum of 20 measurements for each 1-mi.section of roadway for each series of markings(i.e.,edgeline,center skip line,each line of a double line,etc.)and direction of traffic flow when using a portable reflectometer. Measure each line in both directions for centerlines on two-way roadways(i.e.,measure both double solid lines in both directions and measure all center skip lines in both directions).The spacing between each measurement must be at least 100 ft.The Engineer may decrease the mileage frequency for measurements if the previous measurements provide satisfactory results.The Engineer may require the original number of measurements if concerns arise. Restripe once at the Contractor's expense with a minimum of 0.060 in.(60 mils)of Type I marking material if the average of these measurements fails.Take a minimum of 10 more measurements after 10 days of this second application within that mile segment for that series of markings. Restripe again at the Contractor's expense with a minimum of 0.060 in.(60 mils)of Type I marking material if the average of these measurements fall below the minimum retroreflectivity requirements. If the markings do not meet minimum retroreflectivity after this third application,the Engineer may require removal of all existing markings,a new application as initially specified,and a repeat of the application process until minimum retroreflectivity requirements are met. 4.5.3. Traffic Control. Provide traffic control,as required,when taking retroreflectivity measurements after marking application. On low volume roadways(as defined on the plans), refer to the figure,"Temporary Road Closure"in Part 6 of the Texas Manual on Uniform Traffic Control Devices for the minimum traffic control requirements. For all other roadways,the minimum traffic control requirements will be as shown on the Traffic Control Plan(TCP)standard sheets TCP(3-1)and TCP(3-2).The lead vehicle will not be required on divided highways.The TCP and traffic control devices must meet the requirements listed in Item 502, "Barricades, Signs,and Traffic Handling."Time restrictions that apply during striping application will also apply during the retroreflectivity inspections except when using the mobile retroreflectometer unless otherwise shown on the plans or approved. 4.6. Performance Period.All markings must meet the requirements of this specification for at least 30 calendar days after installation. Unless otherwise directed,remove pavement markings that fail to meet requirements, and replace at the Contractor's expense. Replace failing markings within 30 days of notification.All replacement markings must also meet all requirements of this Item for a minimum of 30 calendar days after installation. 5. MEASUREMENT This Item will be measured by the foot;by each word,symbol,or shape;or by any other unit shown on the plans. Each stripe will be measured separately. 825 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 666 This is a plans quantity measurement item.The quantity to be paid is the quantity shown in the proposal unless modified by Article 9.2.,"Plans Quantity Measurement."Additional measurements or calculations will be made if adjustments of quantities are required. Acrylic or epoxy sealer,or Type II markings when used as a sealer for Type I markings,will be measured by the foot;by each word,symbol,or shape;or by any other unit shown on the plans. 6. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement"will be paid for at the unit price bid for"Pavement Sealer"of the size specified, "Retroreflectorized Pavement Markings"of the type and color specified and the shape,width,size,and thickness specified as applicable,"Retroreflectorized Pavement Markings with Retroreflective Requirements" of the types,colors,sizes,widths, and thicknesses specified or"Retroreflectorized Profile Pavement Markings"of the various types,colors,shapes,sizes,and widths specified. This price is full compensation for application of pavement markings,materials,equipment, labor,tools,and incidentals. Surface preparation of new concrete and asphalt concrete pavements more than 3 years old,where no stripe exists,will be paid for under Item 678,"Pavement Surface Preparation for Markings."Surface preparation of all other asphalt and old concrete pavement,except for sealing,will not be paid for directly but is subsidiary to this Item. Work zone pavement markings(Type II,paint and beads)used as a sealer for Type I markings (thermoplastic)will be paid for under Item 662,"Work Zone Pavement Markings." If the Engineer requires that markings be placed in inclement weather,repair or replacement of markings damaged by the inclement weather will be paid for in addition to the original plans quantity. 826 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 668 Item 668 ° Texas Prefabricated Pavement Markings �pspo":" of Transportation 1. DESCRIPTION Furnish and place retroreflectorized or non-reflectorized(contrast)prefabricated pavement markings. 2. MATERIALS Furnish prefabricated pavement marking materials in accordance with DMS-8240,"Permanent Prefabricated Pavement Markings." Furnish prefabricated pavement marking materials used for contrast markings in accordance with DMS-8240, "Permanent Prefabricated Pavement Markings,"with the exception that the color requirement for the black contrast portion does not have to meet the color requirements specified for white or yellow markings.Store all materials in a weatherproof enclosure and prevent damage during storage. 3. CONSTRUCTION 3.1. General.Obtain approval for the sequence of work and estimated daily production. Remove all waste generated from the jobsite before the end of each working day. Establish guides to mark the lateral location of pavement markings as shown on the plans or as directed,and have guide locations verified. Use guide material that will not leave a permanent mark on the roadway. Place pavement markings in alignment with the guides without deviating from the alignment more than 1 in. per 200 ft.of roadway or more than 2 in. maximum and with no abrupt deviations. 3.2. Placement Limitations. Do not place Type B pavement-marking materials between September 30 and March 1 unless otherwise directed. 3.2.1. Moisture.Apply material to pavement that is completely dry. Pavement will be considered dry if,on a sunny day after 15 min.,no condensation occurs on the underside of a 1-sq.ft.piece of clear plastic that has been placed on the pavement and weighted on the edges. 3.2.2. Temperature. Follow pavement and ambient air temperature requirements recommended by the material manufacturer. Do not place material when the pavement temperature is below 60°F or above 120°F if the material manufacturer does not establish temperature requirements. 3.3. Dimensions. Place markings in accordance with the color, length,width,shape,and configuration shown on the plans. Locate alignment as shown on the plans or as directed. 3.4. Methods. Place all materials in accordance with the material manufacturer's instructions,as well as the surface condition, moisture and temperature requirements of this Item,unless otherwise directed. 3.5. Surface Preparation. Prepare surface by any approved cleaning method that effectively removes contaminants, loose materials,and conditions deleterious to proper adhesion.Abrasive or water-blast cleaning is not required unless shown on the plans. Blast clean,when required, in accordance with Item 678, "Pavement Surface Preparation for Markings."Prepare surfaces further after cleaning by sealing or priming as recommended by the pavement-marking material manufacturer or as directed. Use adhesive,when required,of the type and quality recommended by the pavement-marking material manufacturer. Do not clean concrete pavement surfaces by grinding. 827 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 668 3.6. Performance Requirements. 3.6.1. Adhesion. Ensure markings do not lift,shift,smear,spread,flow,or tear by traffic action. 3.6.2. Appearance. Ensure markings present a neat,uniform appearance that is free of excessive adhesive, ragged edges,and irregular lines or contours. 3.6.3. Visibility. Ensure markings have uniform and distinctive retroreflectance when inspected in accordance with Tex-828-B. 3.7. Performance Period.All markings must meet the requirements of this Item for at least 30 calendar days after installation. Remove and replace all pavement markings that fail to meet requirements at the Contractor's expense unless otherwise directed. Replace failing markings within 30 days of notification.All replacement markings must also meet all requirements of this Item for a minimum of 30 calendar days after installation. 4. MEASUREMENT This Item will be measured by the foot or by each word,shape,or symbol. This is a plans quantity measurement Item.The quantity to be paid is the quantity shown in the proposal, unless modified by Article 9.2.,"Plans Quantity Measurement."Additional measurements or calculations will be made if adjustments of quantities are required. 5. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement"will be paid for at the unit price bid for"Prefabricated Pavement Markings"of the type and color specified and the shape,width,and size specified as applicable.This price is full compensation for cleaning the pavement by any means other than required abrasive or water-blast cleaning or milling; furnishing and placing materials;and equipment,labor,tools,and incidentals. Abrasive or water-blast cleaning and milling,when shown on the plans,will be paid for under Item 678, "Pavement Surface Preparation for Markings." 828 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 672 Item 672 ° Texas Raised Pavement Markers �pspo":" of Transportation 1. DESCRIPTION Furnish and install raised pavement markers(RPMs). 2. MATERIALS 2.1. Markers. Furnish RPMs in accordance with the following Department Material Specifications: ■ Reflectorized Pavement Markers. DMS-4200,"Pavement Markers(Reflectorized),"types I-A, I-C, I-R, II-A-A,and II-C-R. ■ Traffic Buttons. DMS-4300,"Traffic Buttons,"types I-A, I-C, I-R, I I-A-A, I I-C-R,W,Y and B. Round or oval unless otherwise specified on the plans. ■ Plowable Reflectorized Pavement Markers. DMS-4210,"Snowplowable Pavement Markers,"types I-A, I-C, I-R, I-A-A,and II-C-R. The following are descriptions for each type of RPM: ■ Type I-A.The approach face must retro-reflect amber light.The body,other than the retro-reflective face, must be yellow. ■ Type I-C.The approach face must retro-reflect white light.The body,other than the retro-reflective face, must be white or silver-white. ■ Type I-R.The trailing face must retro-reflect red light.The body,other than the retro-reflective face, must be white or silver-white,except for I-R plowable markers which may be black. ■ Type II-A-A.The 2 retro-reflective faces(approach and trailing) must retro-reflect amber light.The body, other than the retro-reflective faces, must be yellow. ■ Type II-C-R.Contain 2 retro-reflective faces with an approach face that must retro-reflect white light and a trailing face that must retro-reflect red light.The body,other than the retro-reflective faces, must be white or silver-white. ■ Type W. Must have a white body and no reflective faces. ■ Type Y. Must have a yellow body and no reflective faces. ■ Type B. Must have a black body and no reflective faces. 2.2. Adhesives. Furnish adhesives that conform to the following requirements: ■ DMS-6100,"Epoxies and Adhesives,"Type II—Traffic Marker Adhesives. ■ DMS-6130,"Bituminous Adhesive for Pavement Markers." ■ The Contractor may propose alternate adhesive materials for consideration and approval. 2.3. Sampling.The Engineer will sample in accordance with Tex-729-I. 3. CONSTRUCTION Remove existing RPMs in accordance with Item 677,"Eliminating Existing Pavement Markings and Markers," except for measurement and payment. Furnish RPMs for each class from the same manufacturer. Prepare all surfaces in accordance with Item 678,"Pavement Surface Preparation for Markings,"when shown on the plans. Ensure the bond surfaces are free of dirt,curing compound,grease,oil, moisture, loose or unsound pavement markings,and any other material that would adversely affect the adhesive bond. 829 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 672 Establish pavement marking guides to mark the lateral location of RPMs as shown on the plans and as directed. Do not make permanent marks on the roadway for the guides. Place RPMs in proper alignment with the guides.Acceptable placement deviations are shown on the plans. Remove RPMs placed out of alignment or sequence,as shown on the plans or stated in this specification,at Contractor's expense, in accordance with Item 677,"Eliminating Existing Pavement Markings and Markers" (except for measurement and payment). Use the following adhesive materials for placement of reflectorized pavement markers,and traffic buttons unless otherwise shown on the plans: ■ standard or flexible bituminous adhesive for applications on bituminous pavements,and ■ epoxy adhesive or flexible bituminous adhesive for applications on hydraulic cement concrete pavements. Use epoxy adhesive for plowable reflectorized pavement markers. Apply enough adhesives to: ■ ensure that 100%of the bonding area of RPMs is in contact with the adhesive,and ■ ensure that RPMs,except for plowable markers,are seated on a continuous layer of adhesive and not in contact with the pavement surface. Apply adhesives in accordance with manufacturer's recommendations unless otherwise required by this Article.Apply bituminous adhesive only when pavement temperature and RPM temperature are 40°F or higher. Do not heat bituminous adhesive above 400°F. Machine agitate bituminous adhesive continuously before application to ensure even heat distribution. Machine-mix epoxy adhesive.Apply epoxy adhesive only when pavement temperature is 50°F or higher. Furnish RPMs free of rust,scale,dirt,oil,grease,moisture,and contaminants that might adversely affect the adhesive bond. Place RPMs immediately after the adhesive is applied and ensure proper bonding. Do not use adhesives or any other material that impairs the functional retro-reflectivity of the RPMs. Provide a 30-day performance period that begins the day following written acceptance for each separate location.The date of written acceptance will be the last calendar day of each month for the RPMs installed that month for the completed separate project locations.This written acceptance does not constitute final acceptance. Replace all missing,broken or non-reflective RPMs.Visual evaluations will be used for these determinations. Upon request,the Engineer will allow a Contractor representative to accompany the Engineer on these evaluations. The Engineer may exclude RPMs from the replacement provisions of the performance,provided the Engineer determines the failure is a result of causes other than defective material or inadequate installation procedures. Examples of outside causes are extreme wear at intersections,damage by snow or ice removal, and pavement failure. Replace all missing or non-reflective RPMs identified during the performance period within 30 days after notification.The end of the performance period does not relieve the Contractor from the performance deficiencies requiring corrective action identified during the performance period. 830 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 672 4. MEASUREMENT This Item will be measured by each RPM. This is a plans quantity measurement Item.The quantity to be paid is the quantity shown in the proposal, unless modified by Article 9.2.,"Plans Quantity Measurement."Additional measurements or calculations will be made if adjustments are required. 5. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement"will be paid for at the unit price bid for"Reflectorized Pavement Marker,""Traffic Button,"or "Plowable Reflectorized Pavement Marker"of the types specified. This price is full compensation for removing existing markers;furnishing and installing RPMs;and materials,equipment,labor,tools,and incidentals. No additional payment will be made for replacement of RPMs failing to meet the performance requirements. 831 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 677 Item 677 ° EliminatingExisting Pavement Markings and Markers Texas 9 9 Transportation p of 1. DESCRIPTION Eliminate existing pavement markings and raised pavement markers(RPMs). 2. MATERIALS Furnish surface treatment materials in accordance with the following Items: ■ Item 300,"Asphalts, Oils,and Emulsions" ■ Item 302,"Aggregates for Surface Treatments" ■ Item 316,"Seal Coat" Use approved patching materials for repairing damaged surfaces. Use a commercial abrasive blasting medium capable of producing the specified surface cleanliness. Use potable water when water is required. 3. EQUIPMENT Furnish and maintain equipment in good working condition. Use moisture and oil traps in air compression equipment to remove all contaminants from the blasting air and prevent the deposition of moisture,oil,or other contaminants on the roadway surface. 4. CONSTRUCTION Eliminate existing pavement markings and markers on both concrete and asphaltic surfaces in such a manner that color and texture contrast of the pavement surface will be held to a minimum. Remove all markings and markers with minimal damage to the roadway to the satisfaction of the Engineer. Repair damage to asphaltic surfaces,such as spalling,shelling,etc.,greater than 1/4 in.deep resulting from the removal of pavement markings and markers. Dispose of markers in accordance with federal,state,and local regulations. Use any of the following methods unless otherwise shown on the plans: 4.1. Surface Treatment Method.Apply surface treatment material at rates shown on the plans,or as directed. Place a surface treatment a minimum of 2 ft.wide to cover the existing marking. Place a surface treatment, thin overlay,or microsurfacing a minimum of one lane in width in areas where directional changes of traffic are involved or other areas as directed. 4.2. Burn Method. Use an approved burning method. For thermoplastic pavement markings or prefabricated pavement markings,heat may be applied to remove the bulk of the marking material before blast cleaning. When using heat,avoid spalling pavement surfaces.Sweeping or light blast cleaning may be used to remove minor residue. 4.3. Blasting Method. Use a blasting method such as water blasting,abrasive blasting,water abrasive blasting, shot blasting,slurry blasting,water-injected abrasive blasting,or brush blasting as approved. Remove pavement markings on concrete surfaces by a blasting method. 4.4. Mechanical Method. Use any mechanical method except grinding. Flail milling is acceptable in the removal of markings on asphalt and concrete surfaces. 832 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 677 5. MEASUREMENT This Item will be measured by each word,symbol,or shape eliminated; by the foot of marking eliminated;or by any other unit shown on the plans. This is a plans quantity measurement Item.The quantity to be paid is the quantity shown in the proposal unless modified by Article 9.2.,"Plans Quantity Measurement."Additional measurements or calculations will be made if adjustments of quantities are required. 6. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement'will be paid for at the unit price bid for"Eliminating Existing Pavement Markings and Markers" of the type and width as applicable.This price is full compensation for the elimination method used and materials,equipment,tools,labor,and incidentals. Removal of RPMs will not be paid for directly but will be subsidiary to the pertinent bid items. 833 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 678 Item 678 ° Pavement Surface Preparation for Markings Texas Department of Transportation 1. DESCRIPTION Prepare pavement surface areas before placement of pavement markings and raised pavement markers (RPMs). Item 677, "Eliminating Existing Pavement Markings and Markers,"governs removal of existing markings. 2. MATERIALS Use a commercial abrasive blasting medium capable of producing the specified surface cleanliness. Use potable water,when water is required. 3. EQUIPMENT Furnish and maintain equipment in good working condition. Use moisture and oil traps in air compression equipment to remove all contaminants from the blasting air and prevent the deposition of moisture,oil,or other contaminants on the roadway surface. 4. CONSTRUCTION Prepare enough pavement surface for the pavement markings or RPMs shown on the plans. Remove all contamination and loose material.Avoid damaging the pavement surface. Remove loose and flaking material when existing pavement markings are present.Approved pavement surface preparation methods are sweeping,air blasting,flail milling,and blast cleaning unless otherwise specified on the plans. Air blast concrete pavement surfaces,in addition to the above,after the removal of contamination or existing material and just before placing the stripe. Perform air blasting with a compressor capable of generating compressed air at a minimum of 150 cu.ft.per minute and 100 psi using 5/16 in.or larger hosing. Contaminants up to 0.5 sq.in.may remain if they are not removed by the following test,performed just before application of markings: ■ Step 1.Air blast the surface to be tested,to simulate blasting during application of markings. ■ Step 2. Firmly press a 10-in. long,2-in.wide strip of monofilament tape onto the surface,leaving approximately 2 in.free. ■ Step 3.Grasp the free end and remove the tape with a sharp pull. 5. MEASUREMENT This Item will be measured by the foot for each width specified;by each word,shape,or symbol;or by any other unit except lump sum. This is a plans quantity measurement Item.The quantity to be paid is the quantity shown in the proposal, unless modified by Article 9.2.,"Plans Quantity Measurement."Additional measurements or calculations will be made if adjustments of quantities are required. 834 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 678 6. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement"will be paid for at the unit price bid for"Pavement Surface Preparation for Markings"of the type and width as applicable.This price is full compensation for the cleaning method used,materials, equipment,labor,tools,and incidentals. 835 CALL BEFORE YOU DIG! SHEET LEGEND CONH"�9 PA11ECi M.,900.1, PROJECT SITE SHEET NO. SHEET TITLE 1 COVER STEEL LOCATION son Potrcro countytiivia— ,oa �811 � I LEGEND=LS —ACTIONS Am TESTING SCHEDULE --.hq PROTECT L ON AN' OO THE LONE STAR I PROJECT CONTROL PLAN O"'Ed f NOTIFICATION COMPANY oN6 ESTIMATED QUANTITIES s(,of zl -�. AT I-800-669-8344 �NGIPIOPOSEDTYP ALS ET2 NG ED NUECES BAY l CONTACT CITY TRAFFIC ENGINEERING DEPT. LSFcnoNSRof zl (361-826-3547)48 HOURS PRIOR TO ANY 10 UTILITY APSEMAP EPASTERPATER EXCAVATION 11 JTILTYAYSEMAP n wATFa �n S o� z wu tl y $ SIS 9oF 2) LV012 9 lEAREA A L N I�NGCONDNSSOFA YaOFF) �=e _ _ OFF) garzarmw y oTo„.Fo 21 STREET&1011 ITT Y PIN&PRO F LE'A 010 TO 110 GRAPHIC MAP SCALE �p CORPUS CHRISTI BAY 22 STREET TYP'N&PlOFLEALA"OTOHOTTO 23 STREET&STOP.UTILITY PIN 21 STREET N wvouTa NTFaSTATF ET AYCESS aoAD 2, STREET IN NTE'SECTONLAYOUT a ivEaaDAD m 2 i NS9OF Pa N AL,EET CROSSECT 0CA(1 OF 2l p4 PLAN(1 of 3) a U e 4w n9OF 31 c ig0� �ffi wv P of 31 VI `u PAVEMENT AGRING S&S v.v, .f �. 'i4'ray @ ,P SEP ¢oF31 aIII� ,' ""' r^ a € 2�" 33 PAVEMENT MARKNGS&SIGNAGE PLAN POFF) FINE L SII U�o SLS NCSPN STREET FI NEs GN DETAILS 4 A. E 4y ve (,OF3 c d. g4 qy Ls(z oF3) O /'� +!,' '� t� 37 PAVEMENT NSSDFr Lsp0F31 E PROJECT SITE Yid� •,� . 38 SIGRACEDETAALS(,OFa)A LOCATION �YY - ��j g' g �Q �OLs p OFa) V o YY V F 4) SJ LspoS 4421 Ls(aoFa) NCING NOTES AND PLAN 43 TaEATM NTY CSTO"PRATEDETAL PRECAST R OF zI TaEATM NT(,OFzl F Q O TES(,of z(E Z i TESROF� C7 STOP.PRATE, PREVENT2 ON DELA OF SI Ow + O uw ROF z( F 10 PAVEMENT NOTE:MMDD DD�IAALL: u w PLANS FOR CITY OF CORPUS CHRISTI 'I PAVEMENT NOTE R DPA M NMFN o w VICINITY MAP CALLICOATTE ROAD - IMPROVEMENTS1 CITY 0CO'PU PAVINGA�"°Fp wo w ALSaOFp o o > 2 UP RIVER ROAD TO INTERSTATE HIGHWAY 37 s ALs�°F3° o aDF oo (BOND 2018) a Sp0F°' (+OF w 61 C Y OF CHI AT aL„OF3 PROJECT # 18010A AL 9OFF 0 PREPARED BY DETAILS p0F3 63 Ls(,OF 4) RELEASED FOR CONSTRUCTION: AL:9— TOP,G,R FTURAL•MARINE e CITVOFCORPUSCHRIsrIWATe DETAILS pOFn) 'a $x¢T 1 0/ 86 11'9'21 ToaoOanPwc s_uavv ovwc AL(n OFn) nmanu uwa ua xo. STR 976 DIRECTOR OF ENGINEERING SERVICES GATE coaa11aaisn.**.7a+0+ CONFORMED/FINAL CONSTRUCTION MUNOZ ENGINEERING � � crtr AW12Ci/rmra P�I— gra -1-P 01 11 oulxrvs .11 ZMlPMoMZp=:a I lo0=rvIP 1o1 11 P111 I IlD.1 111 P10-111-IHI -1-1 1 I'll P_IIIII. IK 1-1 1-11111 11 .1 Illp'll o Wig 0.1 IMPI.111 11 1Il IHIO o 11-110-1-1 1101 1 �l 1 MlIllIl--�l IHI 1.1 111 MIll IHI 11 -'p ow%�,ns.D,x,Zl :D, I 1111D 10 Pl D I-Ml- 1 1- .111.1H-D111.111 III 111 111011- 11 01 11-1 MII111011 D I IHI P �01 IHI C-1 1 1IHI 101 1— =D.1 11111 H.11 n DIIII .1 01 11PPI-101 1 "1 1011 01 I'o-, .I,I-11I,orvo11 "DII'l�I"��101�1'DOOOIPIM 0', Z 117M 1%,"O"ll., o o OIHll %1'1�P,1111DI-1111 0111 D 11 11111H1 BI 111 0111-11 3,� I""Hl,1-1 1HII 1�11. I11D P P111 III I opl,11111 10 1-011D��-1- I= Z01 .1 MP =1 D11-111, 1111 I�11101111 111D IHIIII 11D�1-11C MI-1 D-11 ICIIIII. ImIll 01-01 IlOM M111 1101IIIII.III I P1.111 -11tl w pe 6 Mll %ICC.DI P. 11 I_ P-11 D11 10 1,0 .1 T_11.11-11117 11-1111. P111-ol P-Il I"X PlI, Ill- 1-111II I—', P10 lll�111 IPI1111ID 1-1101 �10,�,P"",�'D�'B77��'7'M�1'1'D 10�III.Mll 11- D-11 CllllD-oll-111 10 I'l-ll��,� Ill 101 IM11D 10 P�PI-HIIII. II.Ml .1 IP-1-111 III I=I101TMp"`o'-Io"or I, o'P I- Z`Il.Ol�ISM=81'H'11'10LI� I ,p I 1=o%711[o-1 lo"I'll,wro I'll111110 11 Ilopo-cool.orolo, 'o I, 'o w....... I MPIIII ID Illy 101 D' �oWp, o ................. 1 101 1-- ,1 I_ rods resowresu[ms. .I CoW,_"o I Il P101 W arvisireax 111011 111"oToo l v x 11 D III MPIIIIIIgWID llp�1,11%11"l 1.1, 111- lIwIl D 1 11 1 PI 11 0 0 0 0-17 �171MI'DID'1.0" _p 21 ICO= 11,HM 11 I'll"I I D 4w 'o D.1001D IX�. 01, z. IDI�IID Iy"1 11 11,11=171,1,1�101,10101 11-1-IHI COWMll 61 51 M IHI DM ol or 1 1111 EMI.= r. 1OW-01 1111 111PI-11 III Ill-or 11 D1511. M111111 11 ucorexµcs wxx 1- �11 I.I lo B,I-oll.11 D11-111,ID-1-DI,Pllmll "loll- I 1-11IM11, =nSI-11�0llOT ID" 01 I, ,,"Im,'o ..........I. IH P11- PlIo I,cow-o' DIm-", P,.D Il Z �10 ol.w'ry I III IoOW 11"Dll '1'"Il�Dol�l� `.�l W I'.M�Plo,` o 'D IH P Illo-I IHI.1, pm��Mlooll�mol`.�OZ=01�1 ol 1,111111�111 D"I PlOPl-1011 P101 lo Imm"ll -,I IBol71M.'D IHI 11 D-I Ol I HI'l Z"IllolI I" "'D P� .1111"1-MIW1111�l1111 11m 1, '.1 W-111 11 10U�l MII1111"I I D.OID 11.-1 D 1.11 lolID I P-ol- mlolm 11 oll"1.1 .1 1111 ' 'H' I�y 710.�o D=1101.0,10�Hl�Ppll��l I. 1001111111 IIH IHI 10P ID OPl m_ I, o co Mll I�1-11II I—�l1.1 D.MID I11111 Iy"I P m11"Iw C7 D III-IOIIMIWI 1OW-11 I 111011D M.I.1 ss-euro I-- 1D.11 m M1.1 011101 MODI-111 0 0 ow 11 Il 1011.111 1. D D ".0.1, �I,OPO���S�O B M'I I KO I I I I'D M.1 W I I I.I I I P I I I I c 7............wory P,,o,o o 0 sucu,un, 011 111 11.1 01 IHI P-EIIII 1--1m-11 1111D Il z n'O"K""ID".1=1"�� =oO�llol`.yolpllHllllI`Io.11l` oll 0 A ollml��oll 0 11 Il.1-ID Ill 1.111111111111 P.PIlID IMP-1-11,pllolD,1�1 0 0 rexo�ary ,xsawonusrv,mmry Z l Dl-.1 01 3IHI=4'11111111D 10-IDI.11 IHI �l 11H11 IHI.11 1 I-lO,,o, I M�.11 1- 11Zwllxareorosm1xerorvlrenc,ore "wIu IT 101 1 1�I11POIW OP-lo. m-1-11 m.- uro u<anv wnu 1uc owl x" I I =m:1"IH ID,'1 .11 1-11 PlWDIl III IHI �l D 11 P__ I �lo",O col-I.,111 ac irvnnum 1-11 I'll woicc,row lusia un I D 10 IIDI�l I M 1151�,IIPI� oll", =11'0,1.1"�Il,1H,PII", ",Z D111 IHI M11-1 IMI-Il-1.-D 111-1 11�-DDIIHI� PI'lllMIMW l_H 'o o 1-11 1 1111IIID I IMI Illp',oI"oI P"M �'D� 11"I"Z, wpm. "PID P1`1":l�Hl`PM'Iasswrvsiannvor 1usurvownuro IOMIY IH IHI W 11 I IHI COW-OP OPID 1� 11 Ily IIIAI NI C101AN 11 11 XAE, 'p o �RII_ON,%_I'�,- T 1�1%2 N PI-MlIp'll`P�' m�� 'C"""' I HI MA l N111T I-ION5.1.1 P11101M MA�WIN.11 10 HI W11 A�l m�'ll 11 ION-01 IMIMON1-1.1-Ml.TIMPO-1IN11111 olID N��Zl`� D �II I �IZICV, �o 1- �Il`N' DT'e-.'I'lMoIRNT-"HeoloW=MI'1'1'1' R.D "I M�N 111RIWIl AN�10,0�'N��j IN 'N wa N-111 51PAIIIaIS lH" �D W 0_1-11 1.lI.N I IND.-M N I-Nl, Cal bd_you dig STR 976 9' Rl_�I WI D'IAI'Nll'-IoAl'111'11 ,lHI0olA,THIHl,-lolNTM 'XIWIZ-11 -11TAI N Imll-I Ol 0��,N,1,1 1, R 'dr.7 05_6 Ao�p�IND=A�M'l W 'MD_ -I NI 91 H-11011-1 1-1111-P-11M I IHIOBI..1 11_N D"N N o o ZPII 'D�INNYY oR Rl� 1, IHIA111-11 IIIPINI I"III PINOZ 1�lo�RM I,= 91 R�=�x=a reanrere,rereEnre�„c,.x,K.,rerv,rewox. . x G.,�.rvre=x„�reE, rex�xs.N�rvxgrvx�Px�s�x,.,M µ.rvw�x.,rvx=rerv�x,.,rvx.�xc=.xrvxmxrvc.,�rvrv�,�.,�,rox,xk,rvx=xEsarv,�,rvxx�rvrv�nxc,��rv�,x,rvx,xrvx,�� Rrre ® �,r �,rv. P�rrvsrry sxrv,r srwcr crvxxr�rvx �' �,rerrrrvrry rexnrare rry mr <nrvre=rvc,r=r�cr crvrvrvrnrvry renrre.,rre.2Z ,�rvrer PPr �rery �� ,c rrrvcr rare rvrre rvrrernre aw.;�renrea re rewnrre ,rrn,�re�rerery rerere�,x re rerre ry „x.,�rvx «ax ,_rer,rvrry re�rer,.rvre�cPex � uE< xry o— nrvrex rre i rvreaxkc„w re�re«�rex r.�n�xrynorvxrre ro .o wwu[xr.arecxcM� �.c �� � w.=,cre.,cre a�crv._awsrvso ca.x rva nrvrex rre i rvreax,cc„�,re�re«�rvx-moaosry .�. �re. .�� � x - 0 rvxorcrc,ore�r rva,��rn�ory�m�cre recrvre 12mZ - re _ w-.arekc ,n macre or cored rre �c��;"i �,�� re�rv� oa�o.ro cxrvnrere��xry�rv,rexrvc�i�.re_s:�E w.=,�rv.,�re��,re. Ill �.rere we crvakc-rxn�xry 00- w - nrvrex re.,cre a�o�._P�asrry rvre.,c�x,� - - xrre w x o nrvrex aacry mr <nrvc crvac rvco nrvrex wacre m�xr Preo�co xoPc P� nr rv�ff - . - _ _ � . D III rvreryµre rvrvacre rs�xry ® -om a�rer n _ nrvrex re.,cre a�o�._P�asrry,axxrva - - --or-a.. soca x�m aro n»E aa.-x.,n�rvo o - - nr"" -_ Pocmmcrvc -re ,.�cxrere rvawry-a�xs,�rvoare._rvreoPo;�o ® now ��,��•_��Po;�o�.,,oi�PEx rvxry 7.1_1=- rv,.rexx. xw�vPcxc _ �an �re ao.,coxa mrery reawP-PreoPono mon mom ® nrvrex aam moor.-Px, o rv�o�c corvcreoc x� �re�rvc s��,_rexs,�xry nrvw re.�w u,�u,v_cxs,�xry w,.re�w re _ ,�o rv�rv� -- unrere wo xw-x� rer,�recx, D_%TD7YIIMIIII <n �r ,M-,o�M - rvre.r rvre axrvc orva Erexa crvxxr..rvx - � } p o¢w w (D° _ ,�ory o loom oare�ac a�cr_cxs,�xry x,a»<re orvc � - recP` oare��i o reob arvr,re orvc �xx rv��rr-crervcrvccry wevxrno nreaxoxe ogre_orerec,cre G�x_x� - r coxre m�xr-c=�n�rvo,ocrvxorvr re�rerre vmo rerox�recxrM rorere or�rr-rr�n�rvo xrvormrvoxrvo,orrvxorvr rvre- - - ”' rvE�ry recrorervs rv�GOG ,rvc ,a rv,soae - oreww-ores. �"-x�ncuaHcoos ,00-,ory m don � crvxx Noor_�s,�xry��rv�re rv��c x,a»<re _____ _ mGG or��r-PooPosEo orvo�m000rvo,o„uorv� xrvx-xrvxrvxcM ov- x re _ rc„-orecry _ - cnMreoc ooK z z loomxv-., .. nra-arervaa tsr�re�aw.rv�mp .. n�rw muu ¢ O _ r,are�c 11--rear sm aP�aPao,rvrvcc-r�reuoPorena oaaPa�Porv,erycwwre ree�reare —..-..-..— P�mresm-nreuv aur rwa-s� ''._--. �mxuocxux ryNcN��,r.--_nxarvrvvaxreoorvvaPrvo�Psscocxryo rvrvoc xKrvca�ourecm.reooxrvrerv,xaaxryryareremc�ff oore re rv:,�soc �a�mo-__ce�xaucu�nrerec�caa wmsvrecsre cow�via` wxrys=xxm rnuryrv-x__rrvxP,c E cry d O ww7o sne v Z2ome1e11 7o -11 w,woarereom1 mmaz �¢¢j w MM MM 11—11—-PIIPIIIDIIIOIID11-1111 - C0=o)w N a° ° —— owwocry Preom rex���ryo w�-wcorec re G o Q o �..Erec .��rvx m mom o O o z ooU secnoxcu.owecnox R-,kc o�Nreo,o„�o� Pc-Premc�recx, wm-axrec "�' o¢ za sxEE.wxE�sxEE.wxEreEcrv.�sreo�wx �s.a�x �rvrexa�xrva A SECTION TITLE w a> w U a - ovawixosis usyso os.aicixoica.ov�sv xuMssv� wrv�xe x S Eoreaw�xrvs o areo�oreouxo enc sx¢r 3 •i 66 DETAIL TITLE ssc.iox ov os.acxuwssv aids ovawx is.^"s" nate oaurvcsw RFfORR RPIHINC NO. ` 5 a u�icnr cocmirvn ansxPcaa<n�c v�c xrsrvs a 0 ovawixo xuwecv saw.wa*[a. or urvo[reoreourvo ur 9 �wxcvcsccnox ov sxccc wxcv cocncwo vuo xutnrvn vaiaa ro coxxcncixc arry caxsauniax s 8)B `oEw�scou srerc*ore.o areaIocnreeiEov.o.aE owmE vma.xc If1MYIM16B�0YV. cs��.,�"� STR 976 �ry rv, ff is ._.__ �xP nA,n�,rvn nA aEME an IN 6W c CALLICOATTE ROAD PART OF THIS CPNT_T ad m} (M5 B 4 7 ti 3 W WATER LINE o F- EXTENSION coNTRAcT z o O o O a> sm7 4 of 66 9 STR 976 � PA21ECi M. 900)1 �® ego �® CONSUL!Y5 91EE1 I -El-1 'I'll 1--IE- IEIII- -7— I -IE 6W ---- ----- ----- ------------ -- ------- om—o— VI�7. .......... 'o, IF 11111 (M5 II I iI A® ' e �-- cnxcaoe case al -El MEIEI IE rem 1-11 FEIII 11111 IF CP-2 1. Boa or lllll� 1-1-E FlIll 11 1-LE sm7 5 a 66 STR 976 ............. \ ���/ \ \ \\��/^ / \ � �� }\ CL (M5 \ �\_�_ \ \ �����` / \ ( \ } \ �qy�� \ \ \ ����® } � \\ : HMO } \����` \ \ \®\�� EXISTING TYPICAL SECTION-STA 1+50 EXISTING TYPICAL SECTION-STA 5+50 NOT TO S-11 NOTTOSCALE E,L -E +ere a N E i 77 i (M5- 2-t:18 ' _7777 XXXX 1'I'l LEE 1111 E ILE < 77/1 Ell'11- 77 7 't77_7_72 -LEE E IIEl cc.reL. E PROPOSED TYPICAL SECTION-STA 1+50 s PROPOSED TYPICAL SECTION-STA 5+50 NOT TO SCALE NOTTO SCALE z o zi w,C7 w w>w w <, Eu o Eu -E -E o o Of K 0 z >w E- n W/nmmw/,� �, TYPICAL FLEXIBLE TYPICAL RIGID 7 of 66 PAVEMENT SECTION PAVEMENT SECTION NIT 11-1 A STR 976 rxvar en.wawa 'III -IT "I EXISTING TYPICAL SECTION STA-10+25 EXISTING TYPICAL DITCH SECTION g gy=m NOTTO SULE NOT TO SULE --l-E 1110 111'. 21 -E 211 'M PROPOSED TYPICAL SECTION STA-10+25 o PROPOSED TYPICAL DITCH SECTION NOTTO SULE NOT TO SULE z o w w >w w w o o o mm >w WI.—M IZ I rIZI uus eE.—El. 5 SHEET 8 of 66 PROPOSED PAVEMENT REPAIR F PROPOSED TEMPORARY PAVEMENT SECTION NOTTO SULE NOTTO KATE s STR 976 sao CL M5 ( pkw o r C7 o< o 9 sm7 9 of 66 g STR 976 PR51EC1 en.wawa zq 0 0- 0 00 ----------------------- . , r � x J . \� • � °\ z \ ` . ) (M5 7 / \ | 00 ) x E_ « ( _ \\ \ � a 66 .l Sm g7 | __ _ v � � \� /��, Z ° �` �� }\ CL Q� �\ ^ ^ / \ � ---- ` `y \\ \ '0 0 0 ( ~ �® �. . <>W ! | �\ {}\ » �( }\ , \\ « 0 w z ww 0} ~ 0 w w w Q 2P 00 w 0 w ---� mxsur Ys srn P a N o m •. 40 a o } E CL N- _ F �y w s 0 O Ow ¢> Q U� O 8 � s sx¢r 14 of 66 RFfGRR OPINING NG. � GRYPRORYIj r�ra .p mw ®--- � o — w s o � A _ ® = (M5 t td 09 � N a rn zi a �= G a of w �F a rn w d O N F z 0 a z w0 o k o w a O 0 U� a> Q U� O 8 � S SHEET 15 a 66 RFfGRR OPINING NG. STR 976 � GRY PRORYI�,�,a JAI' 1-7 ————-------- ------ - —— ------------------ - ------- -——— ------------------------------------ ------------------ --------- —————————————— ——— ——— ———————————— ——— ——————— --————— - -------------------------— 0 tlQ D LU I /4f 16 8 000 — W 0 I'll FlIll re111 I'FlIll 0 ZO 0 0 0 ---- - -------------- -- -------- ----- - ----- -- - --- - ----- RFfGRR OPINING NG. O C;- MATCHLINE B fQ 18 2z ----------- 40 ELE-� 1-1-1 11LE. E-111E Ell�-Llll FEIIE."I E-C L'IE�"I E--10�E'El"I I LL-111E I-T - ------- -- ----- 7 ewe BPo E go NO E--El A RFfGRR OPINING NG. O1 �T I �+ 18 ,"!....................... LU eF LLI M A T C H L I N E C 411 ti OO o 0 ZO 00 SHO 18 d 66 RFfGRR OPINING NG. STR 976 0 0 J- .. .. .. ... sere F U) LU ——————————— z MY ------------------ «°NR PAIIT 0 INI 11- 1 1 H-P—m-, lo 11 Ems= o —o 11 0 Ellls IP-T D, o' _o PEI NER 1,5 DE` w >w >o U) "P U) I w, w -R E- 0 z LU IIPI LU 0 Z -EP z,o=ff:". �� w c�z 10< (D 0 0 Z "'1111.ITE'T...... F::j C.D E IPII CH1 11— <>w 0 2E T"CON 01 COOPDI.Tl WIH M�Hl w .......���, 0 E.TT, ------------- I—RI-E TH 0� 11-IL �l INI I I P- HM= l 'N" �M'IN 1-111EI F EM 1-1 P_M_) �BL. ILDI SHEET 19 oT 66 01 + =V_ LLI ------—--- War M.T M A T C H L I N E STA 1 3.85 o >oo o DEMOLITION NOTES:EW w 0w 0 z o (D 0 L 2 66 STR 976 10 _ w _ „ om zi % .no.. .o� �.w..e��.�_e..�e�_ ...xM�.o..a (9IIII}} ��¢ s ni o w w 0 > E ti �i a nmx i. U — s x. Ix roo- our.m.w , n ns LL ndn m,m w C7 a max a. — ao g O — — Z nu °' Soo O a x ]I I m!m n!a ny• u, 2. ns K O N wt w Q Q H 55a � Iry n: a � w • a5 xs: —mss ear —�_� — d �dl =d-• u da =da cda =d-• CM =d= x[r 2 7 of 66 " s s „- Elk �¢ ��¢ 5 sg �¢ ��¢ 5 sg �¢ ��¢ 5 sg � a 5� RFfORR RPImNC N0. „� STR 976 22117 10 '0 4ec c a� F A sZI m�— i U)j LU m. LU 2 21 -1 (M5 ti r�ssa ---I'Msr nn r sr ns 'o ax w(D w w z o °a 30� o w, as + z �5 oo I L I L 11 11 o < rn _121 OM 7. 1-2..1 w lw mf.57.m 9 2 IN I INN c'M II- c'M i IN3, c'M .'M ix�s i c, PR5IECI M.,�„ of4r — f >`!It b�.Nb.,Nnl, $ �.wm.nms• y maa LU 18 J a1 ~1 N my mwns sws s v, u.b -41 t Y MATCHLINE STA 1 + 33.85 v _._._............_.... . m s �l}ui o w w U o nsa sr ml Isa ea ea � — W e »s 6 m 6 mw »5 nt y a a — LL o m W p a ns % asa I ,st " ssa ssa c cxn aam m.mx O F Z + �7 - - I- - -T a ms a0 Ire:.,m s.nam sr cm + + na 0 z 500 ata n 7 1 ns bs sr cl" bs w O + a — m o o O¢ sss "m \� sss n•. _. - ¢O r~il� us ' us � T T _ "�'ar •... ry61 — — nmtllf b. Sr blf 1.111.Sf CIO.... I T Srk 1.5261.tl5. U aS' St0 !me n b Sta ma W 6h U a Q — - - 1 4 I 4 I. 4 n. i - Isa ea ea " m5 m5 W 's sx¢r 23 ai 66 ,; � '„ na .Ina RFfGRR OPINING NG. „� STR 976 � GRY PRORYI�,�,a PR5IECI M. �„ 0 � H v d m}}ag a "s �lui o W w 0 > E U 0 z i F p O p 3� �s�wreorea� �F z w O U u p F W 0 Z Q W Q � n 0 K LL1 W U� � a ° 's sx¢r 24 of 66 RFfGRR OPINING NG. N.E.CORNER INTERSTATE 37 ACCESS ROAD S.E.CORNER INTERSTATE 37 ACCESS ROAD STR 976 a � cNr PRartxr f rmra 4�el—I 7; (C.,�7 00- ----------- 5CL (M E ---------- �w o 0 F 0 0 0 0 1- INI 11-l IINIII-N 0 0 <w> sRa725 a 66 RFfGRR OPINING NG. N.E.CORNER OF UP RIVER ROAD S.E.CORNER OF UP RIVER ROAD 9 STR 976 PA11ECi M.,900.1, 74.00 74.00 74.00 74.00 ff M ,o 73.00 - _ 77.00 - 73.00 73.00 ` / 72.00 72.00 72.00 - 72.00 71.00 71.00 / \ 0 71.00 0 71.00 c �'hh a a a a m 70.00 m 70.00 cxis creme 70.00 m 70.00 m 69.00 m 69.00 m 69.00 m fi9.00 00 68.00 68.00 68.00 67.00 67.00 67.00 67.00 9 _ H p 0 10 20 70 40 50 0 10 20 30 40 50 0 10 20 30 40 50 0 10 20 30 40 50 fi0 STA 0+50 STA 7+00 STA 1+50 STA 2+00 8 tl N. w ��e 76.00 78.00 76.00 76.00 75.00 75.00 can°Pmc 75.00 f ms eremc 75.00 74.00 - em�� 74.00 / 74.00 74.00 Z 73.00 73.00 / 73.00 73.00 / a s w 7z.00 n.00 72.00 n.0o _ w n.00 n.00 71.00 n.aa 70.00 70.00 70.00 70.00 3 U H 69.00 69.00 69.00 1 1 69.00 a III d H c 0 10 20 30 40 50 60 0 10 20 30 40 50 60 0 10 20 30 40 50 60 0 10 20 30 40 50 60 STA 2+50 STA 3+00 STA 3+50 STA 4+00 76.00 75.00 75.00 73.00 0 75.00 74.00 .;, 74.00 73.00 F}- E Z 74.00 ms creme 73.00 -'�1 "-�� 73.00 c.+s eremc�EL- 72.00 ms cwm i� U o 0 73.00 72.00 72.00 71.00 w M 3 n.00 n.00 \ n.00 7o.ao y 0 na g m 71.00 70.00 70.00 70.00 69.00 89.00 fi8.00 i O 69.00 68.00 68.00 87.00 w rn 0 10 20 30 40 50 60 0 10 20 30 40 50 60 0 10 20 30 40 50 60 0 10 20 30 40 50 60 Q Z STA 4+50 STA 5+00 STA 5+50 STA 6+00 F 74.00 71.00 70.00 69.00 p Z 73.00 70.0069.00 68.00 w O k Q Z 72.00 69.00 E _ 68.00 p �cxEs - fi7.00 OO F 71.00 68.00 67.00 fi6.00 ____ U w m 70.00 67.00 66.00 fi5.00 _ ns mrwE U a m 69.00 88.00 65.00 64.00 s creme 68.00 65.00 64.00 63.00 0 67.00 64.00 63.0062.00 S "'x726 0/ 66 0 10 20 30 40 50 60 0 10 20 30 40 50 60 70 80 0 10 20 30 40 50 60 70 80 0 10 20 30 40 50 60 70 80 RBXIRO RP.YIINO xo. STA 6+50 STA 7+00 STA 7+50 STA 8+00 STR 976 SCALE HORIZ:1"=20' a SCALE VERs:I"=1 [,n p0ij,m,a PROIECi M.,900.1, Bfi.00 r ..... re65.00 63.00 62.00 w io 65.00 /Im� 84.00 64.00 _ / E 63.00 61.00 �exn - 60.00 Z 11 Z Z - Z 0 63.00 0 62.00 -- 0 60m 59.00 m 82.00 m 61.00 m 59.00 _ m 58.00 m 61.00 m 60.00 m 58.00 m 57.00 80.00 59.00 57.00 S.0 59.00 SB.00 56.00 55.00 rwr wa d a H p 0 10 20 30 40 50 60 70 80 0 10 20 30 40 50 60 70 80 0 10 20 30 40 50 60 70 80 0 10 20 30 40 50 60 70 80 m STA 8+50 STA 9+00 STA 9+50 STA 70+00 8 tl N. 59.00 58.00 m 57.00 r 0 5600 / m 55.00 a _ m 54.00 53.00 a U H `u 52.00 e � 0 10 20 30 40 50 60 70 BO 111 ¢rn STA 70+50 0 > E ti U 0 3 �� i O z Z ¢F O_ ¢ u O z � ¢O w F O ko ¢ U 00 w U� 8 S sHo 2 7 At 66 RECORD OPINING N0. SCALE HORIZ:I"=20' M STR 976 SCALE VERT:1"=2 pry PfldECil,R),a maa CL 'D LU n. AW 0 0 00 0< 0 <> SM728 a 66 RFfGRR OPINING NG.M STR 976 .. MATCHLINE B ....... LU -- ------------ 7� 7 CL (M5 10 - --------- -- ----- LU LU ------------- as „ <> 9 SM7 291 1 66 STR 976 PR5IECI M. �„ � (n vv x,wxrtl a � ,.m ,.m ,•m „ten a a � mvYwmva.F a ow F �e'ahA un: s mmol aT Wm uE u'E F •••. — pez Go T. � cvs v N wNNw��rs co CO LU F mn ,wNn 1 �I MATCHrs LINE STA 1 + 33.85 �I a NNS m?aga .............,.......... . a�,..,.e....,...,...,e........ ,,,...p_e.�.....,..ae._e,e.�.. a�,..,.e....,...,...,e........ � E��.w.Eo w�w..mu-wnrevwnrrEwnrev e wns anon rax nw,o.00.w„ao g \1:1 pXW ` p c E o�E U 0 Z > 3 t— zi F ” O F rn ~ w O 0 Z G a O � O o Q O t— � Q> w U a Q s SM7 30 of 66 RFfGRR OPINING NG. .Ea=EoEa:ww�aE:o'r�:�`� STR 976 � GRY PRORYI�,�,a LLI :z � �( }\ ^ „ � � . � \ CL.......... � \� \ { 1 � � ~ / < / . z }LU 0 }k| �^ | o 10 z 0 w 0 < 00 z w 2P } | _ _ / sm7.3 1 a 66 STR 976 _ MAISHLINE B 0 0 r IN 9 LLI (M5 CL 0 + 0 :F�=N MIFF:,T� SI: 49 30 > Z OF U) lu) LLILLI 0 0 o z 0 < 0 JW- 0 z -77 9 sm7,32 a 66 STR 976 /All s mea LU LU LL Fl MAHHE STA 1 + 33.85 ........... maga �'71. ZN�MZ(Al 1111.1 'f MLL0 O ........................ ——— s sx¢r 33 of 66 CROSSWALK PAVEMENT MARKINGS STREET NAME BLADE SIGN PA ECT M.wow+ IN ID PAVEMENT BETWEEN oL-- INSIDE EDGES OF STOP BAR � s AND CROSSWALK TME rc� w INSTALL 24°SOLID WHITE STOP BAR 1 1/2' 1/2" 3° FROM EDGE OF GUTTER E T Rd MINOR STREET G EXTERIOR LINE OF FURTHERMOST e CONTINUOUS YELLOW STRIPE �. N a m e I 9 - 1oo00T 1 MEN STEP D THEN S GAP TO BA THE NEXT CROSSWALK BARS S7Tp1:START BY PLACING F - THE FIRST CROSSWALK BAR mm AT THE CENTER OF ROADWAYIS i y LOCATE STREET i e IDENTIFICATION SIGNS IN THESE LOCATIONS NOTES: 1.STREET NAME BLADE MATERIAL SHALL,CONSIST OF EXTRUDED ALUMINUM.THE ffIGHT OF NAME BLADES SHALL BE 9 AND THE HEIGHT OF LETTERING SHALL fi.STREET NOE LEGEND SHALL CONSIST OF INITIAL CASE.PONT ON STREET 9'ON CENTER NAME BLADES SHALL BE SERIES B.WHEN TWO STREET NAME BLADES WILL EACH APPROACH BE ON THE SAME ASSEMBLY,THESE TWO STREET NAME BLADES SHALL HAVE THE SAME WIDTH. F u_ PLAN 2.ANTI-GWAFFlTI COATING ON FRONT OF THE SIGN PLAQUE IS APPLICABLE TO ALLIn SCALE: N.T.S. SIGNS EXCEPT FOR NAME BLADES. _ 3.REPLACEMENT OF SIGNS SHALL MEET 2011 TEXAS MANUAL OF UNIFORM TRAFFIC 3 U 4 SOLID WHffE STOP BAR CONTROL DEVICES(TMUTCD),AND TXDOT STANDARDS. H (zRO C HFA,APPLIED 125 M14 CROSSWALK BARS. MAINTAIN 4'PAVEMENT PREFORMED THERMOPLASTIC) a III (L H BETWEEN EDGES OFSTOP CROSSWALLKAN D 2 O 4' } E H GAP BBAAR S.I.PGE HppFACROSSWALK HSP APPLIED U n THERMOPLASTIC)RMED .i; MAINTAIN 12"FROM UP OF CURB NOTE: NOTES: i Z gk E TO CROSSWALK BAR. LONGITUDINAL BARS SHALL BE PARALLELN Q Q 0 Is TO TRAFFIC FLOW IN ALL CASES 1.ALL STOP BAR AND CROSSWALK PAVEMENT MARKINGS SHALL BE 24"SOLID WHITE, F TYPE C HEAT APPLIED,125 MIL,PREFORMED TFjERMOPLASTIC.HIGH CONTRAST Z I 0 _ ROSSWALK INCLUDES 24 SOLID WHITE WITH fi SOLID BLACK ON BOTH SIDES (9 C7(- LONGITUDINAL CROSSWALK - DETAIL gPE C HEAT AP HEAT APPLIED,125 MIL,PREFORMED THERMOPLASTIC). I Z_w FOR ASPHALT ROADWAYS - SCALE: N.T.S. 2.CONTRACTOR SHALL PREMARK STRIPING LAYOUT FOR CITY APPROVAL PRIOR TO >w Y K Z THE PLACEMENT OF ANY FINAL PAVEMENT MARKINGS. O Q Q 3.THE PLACEMENT OF CROSSWALK BARS SHALL START BY PLACING THE FIRST ~ TO 4 SOLID WHRE STOP BAR CROSSWALK BAR AT THE CENTER OF THE ROADWAY,AND THEN 4'TO THE NEXT Z W (ZTYPE C HEAT APPLIED,125 MIL, CROSSWALK BARS. MAINTAIN 4'PAVEMENT PREFORMED THERMOPLASTIC) O F W Q BETNEEN EDGES OF 4.DO NOT STRIPE STREET WITH ROADWAY SURFACE TEMPERATURE LESS 557. O z W m 24" OLIO WHITE CROSSWALK ° STOP BAR AND 2' 4' BAR TYPE CHEAT APPLIED, 5.ALL CROSSWALK AND STOP BARS SHALL BE IN ACCORDANCE WITH THIS ETAIL 0 >W CROSSWALK 125 ILL.,PREFppRAPED AND THE 2011 TEXAS MANUAL OF UNIFORM TRAFFIC CONTROL DEVICES W.CD). I- E GAP THERMOPUSTC) k O tt 00 Z fi"SOLID BLACK CROSSWALK ~ _ BAR(&XTY1PE C HEAT APPLIED, �K �W III C)RMED K a U 51 MAINTAIN 12"FROM UP OF CURB Wb 6 TO CROSSWALK BAR. NOTE: W TN ONGDIBARS SHALL BE PARALLEL T 's sxaT 34 0/ 66 TO TRAFFICC F FLOW IN ALL GASES ��' RFfORO OP.YIINC N0. HIGH CONTRAST CROSSWALK - DETAIL STR 976 FOR CONCRETE ROADWAYS - SCALE: N.T.S. crrr PfldECTj rmra CONSUL,YS 91EE1 GENERAL—ES n 4 1— � e ` EDGE LINE AND LANE LINES ° e 5 pmL ONE-WAY ROADWAY TYPICAL TWO-LANE.TWO-WAY PAVEMENT ns oe°r e° ne ore T." F p "p MARKINGS THROUGH INTERSECTIONS mea WITH OR WITHOUT SHOULDERS oa z w k`^ 1 E°oe or vc.emen. + °a. WrER1AL SPECIE ICAT ION S w die,'So vnvEMEUT ueaxE E 6"min, ` as aEFtECTo ZE' ons-�xo0 � l ( e ry o 8 g8hg Ea9eet an_ g8. .83 Eece're L'n e — e—so 1° fc — .x aerr lc aAleuo x[svE soewii- -LIE. xRvtAsris A oceemen.m a .eom o o a spec ce a s � � e a oy ua e. ns. voeoxer e. A u a v �F. CENTERLINE AND LANE LINES tLE.,.xl..,E Ro. ut FOUR LANE TWO-WAY ROADWAY TYPICAL MULTI-LANE.TWO-WAY PAVEMENT ,, c III?a ut WITH OR WITHOUT SHOULDERS o MARKINGS THROUGH INTERSECTIONS /"s.`a": " PIIS p k Tel1—LTNI r eioaaaaa 6IV0 0 TI 1. 1 � 11T 111 IL en<°,px. °°. 71 TWO LANE TWO-WAY ROADWAY YIELD LINES 00 m' > m T WITH OR WITHOUT SHOULDERS A. x - z° e.Ee°e ,er e w°Al e e�=zo w i 0 eme �e� NOTES GUIDE FOR PLACEMENT OF STOP LINES. o F E ^Ln,> o nnotene t,M, a EDGE LINE & CENTERLINE E F w 6z r777 a t ° *'ae°9n.e�n.. e s Q Z �e �0000nr Lse. BOSe o e, TYPICAL STANDARD o o PAVEMENT MARKINGS v w tlA— es PM f 1 I-20 a a _ FOUR LANE DIVIDED ROADWAY CROSSOVERS 0 s sxaT 35 of 66 o -.... RfCORO OPNNNO NO. STR 976 REFLECTIVE RAISED PAVEMENT MARKERS MATERIAL SPECIFICATIONS FOR VEHICLE POSITIONING GUIDANCE E-1 11D AD.E51- BIT-10IS ANES[IE-MENT—EIS 11 111 .—T I A D T—FIC IAINI .1-1 Tl-I Dl"'LIED I.—LASTEC .1-o lElllElT 11-811-TED I—NT 11.11GS-8210 It-A �o �o �o CENTERLINE FOR ALL TWO LANE ROADWAYS A CENTERLINE AND LANE LINES FOR TWO-WAY LEFT TURN LANE ED p TyTYPEI (T,p Vi— qt� ' 8. CENTERLINE 8. LANE LINES Ln FOR FOUR LANE TWO-WAY HIGHWAYS JJA T_ pill ;X2 . d f TLANE LINES FOR ONE-WAY ROADWAY (NON-FREEWAY FACILITIES) T-I I I... Type II (Top VI T': T- 15" DETAIL 0 I I o I I o I I CENTER OR EDGE LINE GENERAL NOTES r-izSECTION A I �w > 0 < 2,0 BROKEN LANE LINE RAISED PAVEMENT MARKERS REFLECTORIZED PROFILE PATTERN DETAIL % oz z U1111 R11LIC-1 K-1 11—T 111—GS0 POSITION GUIDANCE USING < RAISED MARKERS 00 RELECTORIZED PROFILE Df z A I��Ik�,T�16_a�� MARKINGS > > PM(2)-20 < ENE—E, T—AL 6 L T" L.lE LINE DR ..... NOTE U sm736 If 66 STR 976 __l/ PROIECi M.,900.1, NOTES GENERAL NOTESa�. 5 ^ me. n.. ^ .n....... a ^L rwa s e Des s.°.re.as.Po3ted E6€ aqe oVl It f ° r - pmz d rc Hrc 012 111 s a '.3 .ne . V 'aoipan°ii TL y° 1. DDI -w z� a,LANE REDUCTION a ---- -----1 c o<°. °r�e ENe°eP rMATERIAL 5PECIFICATIONS LiEll""IE111E1 - --Tr �. ogo — sEEiwl• e a wn r�a,e L e �1 111-11 11.11111-ONE 8240 a n°TYP m }j H eICAL«TRANSITION FOR TWLTL II11a AND DIVIDED HIGHWAY "aIllioWw SSEp SFE DETAIL A Ye a.Ii.. — y T e e — e e SEE DETAIL. S a e ( o ._ g: 6 0.l6 44 b�— e " o - TYPICAL TWLTL AT ONE-WAY STREET AND RIGHT TURN AUXILIARY LANE �'f s— .7 I - L..ene an n ., see erein° � -Ft�e NZe �� J a *r°e -N 0 a < a TYPICAL TWO-LANE HIGHWAY INTERSECTION WITH LEFT TURN BAYS d o L ° a s 2e O z Y gg D pox�.� —' Y.11-,-E ,9: TWO-WAY LEFT TURN LANES, ELI° < — — — — — — — -- , � P RURAL LEFT TURN BAYS, Ga AND LANE REDUCTION o° z N Non - ***TrP=° r e r°i. r"e'e^er"°`°ra°a<I— PAVEMENT MARKINGS �� ' b 4 LEI PM(3)-20 a> LEI STREET res .. U K Q DETAIL A DETAIL B '- TYPICAL TWLTL AT TWO-WAY CROSS STREET AND RIGHT TURN LANE DROP s SM737 Df 66 RECORD OPINING N0. STR 976 � crtr PPO2CT f,mra _aNrS_ SIGN SUPPORT DESCRIPTIVE CODES REQUIRED CLEARANCE SIGN LOCATION FOR BREAKAWAY SUPPORT SM RD SIGN ASSM TY XXXXX(X)XX(X-XXXX) PAVED SHOULDERS T-INTERSECTION 71I HIGHWAY INTERSECTION INTERSECTION "—I—_p AHEAD A 1: v 2, S e8 1� Z.— IT— T� E: ..3 IN ............ AHEAD I — i _j F' 7., 1- 1.1— I—Il 1.11 1.1 ILI'11 iP xv LESS THAN 6 FT.WIDE GREATER THAN 6 FT.WIDE �14ILII �F'I'ZZD re,�l 7iirr°r6 s�v sI,ar �.<.. yv w apace cerww we<wins. ^'eoaa or tre rro.a lar. nr, H, BEHIND BARRIER "Em 6e u R.— HIGHWAY HIGHWAY ACCE,lable 588 wIc In-loINTERSECT INTERSECTION ———--------- within a 7 ft. cl,cie. AHEAD AHEAD og E CIL n' �n III Not Accep table Y FT BEHIND GUARDRAIL ue BEHIND CONCRETE BARRIER 'Not Acceptable Not Acceptable mor 11 21 711, SIGN ATTACHMENT DETAIL TYPICAL SIGNS WITH PLAMES RESTRICTED RIGHT OF-WAY .1,A— H_ Single Signs Back-to-Back Signs Q EAST ��`'� a,T. HIGHWAY FEAST ............. ii AD .A 1. C) < < Y T—Wtafloa0 0ur 0 CURB&GUTTER OR RAISED ISLAND .1.1 0 DID b, ,*l Ri . SIGN MOUNTING DETAILS < z 14 H GHWAYO SMALL ROADSIDE SIGNS 00 TERSECTION AHEAD —........I..... GENERAL NOTES I DETAILS <> 0 SMD(GEN)-08 ..n=t%� I if 11—A, If A, TI IM'I'l 'T 2 aP TRIANGULAR SLIPBASE INSTALLATION GENERAL REQUIREMENTS NOT There ims oo,ices opvoed ....... or wgulor Slipbose Sy Stem. Keo Pleose referenceProd— IT. the Motet l' 11—ISTM 1111 pez Li.1 for approved SI;P b—SySteft. 1,"y s httpi 1/t,dot.gov/busimss/prodwer list.him min The devices sholl be 7nstolled Der IN manufacturers'reco-endatiom. Instal procedures sholl be ReP vovideol to the Engineer by Contractor. L ...... ........ .... .......e . 11mos me,e.as 12' 11 T11-id 1-1. =T. ............ P aaa ma N 1-11TP ll CONCRETE ANCHOR 0 0 of .4 w, < < 0. 0 < SIGN MOUNTING DETAILS < z 0 0 ROADSIDE SIGNS (9 SMALL of T. TRIANGULAR SLIPBASE SYSTEM <> D(SLIP-I)-08 im —.1-m—N. SM Q—T TI I �da SH039 a 66 2 STR 976 GENERAL NOTES REQUIREMENTS FOR INDEPENDENT MOUNTED REQUIREMENTS FOR BLUE, BROWN & GREEN ROUTE SIGNS D AND I SERIES GUIDE SIGNS SHEETING REMIREMENTS ds nz 1-111111 -TI T111 1111-1 S.EETING 1-11EMENIS e..1 Z-El I 11, 11w Sze 1. NORTH wa AOKTERSTATE o� ' 10 4101, 3 Z n�, n nn e m � �n (L LNITJ DEPARTMENTAL MATERIAL SPIE g. SCENIC NORTH 1-F- T-ALl G_ AREA lO ALLNINLN SIGN ELANIS TIECINESS �,x,-77 �_ 3 >w 0 < a 1008 4- Lockhart 4- Austin State Park Garfield -lo- TYPICAL SIGN eao < < z REQUIREMENTS 0 0 TSR(3)-13 a>w TYPICAL EXAMPLES TYPICAL EXAMPLES 2 CORBUL/T5 AHEET PROTECT AD.,�.,, REQUIREMENTS FOR RED BACKGROUND REQUIREMENTS FOR WHITE BACKGROUND *MW REGULATORY SIGNS REGULATORY SIGNS GENERAL NOTES s1 Er (STOP, YIELD, DO NOT ENTER AND (EXCLUDING STOP, YIELD DO NOT ENTER AND ns We WAY SIGNS) WRONG WAY SIGNS) 4 E''n 6,m 55 4 " N 3 (WRONG 1 ENTER l WAY +S, TYPICAL EXAMPLES ~ S REQUIREMENTS FOR FOUR swnm.o aeon Snae�s. AF SPECIFIC SIGNS ONLY A F= SxEEi MNG REOUIREMENiS in — I'� SHEETING REWIREMENTSI SIGN F—11TE—L :3. g° _ &�P ALWINUM SIGN BLANKS Tx ICINESS 3 U nI G NIFLI-11 11M 777- d III}mac aIIIS p k W U W—o W?; REQUIREMENTS FOR WARNING SIGNS REQUIREMENTS FOR SCHOOL SIGNS o „meg' DEPARTMENTAL MATERIAL SPECIFICATIONS ~ SCHOOL o /♦ SPEED =i - M LIMIT 20 o . a .Rs Isxs z x - °n ° °°n ° sic° �m5 *nnP://Twww nmLg os r 0 TYPICAL EXAMPLES TYPICAL EXAMPLES ~ K E Q F F SHEETING REWIREMENTS SHEETING REWIREMENTS _ K 0 W USAGE C0— SIGN FACE—ERTAL USAGE I—G I GN IACE MAIE111 L O TYa TYPICAL SIGN o o z ° '° REQUIREMENTS G a> U TSR(4)-13 a sm7 41 oT 66 RECORD OPIMING NO. a STR 976 � crtr PfldECTj rmra rr Jun is O 8'o C)z 0 0 Elm AM42 of 66 RFfGRR OPINING NG. STR 976 7A S D BARS"C" weportm LA PLA)VC',F5'Sr4jVV.4ffV1,VLffr PLAvaFPOSr1AlLffT —11 iF- CL PLAN VIEW GRATE BLOCK u '6 S-SC77ON" PICKSLOT DETAIL Boo vz < U o GRATE SECTIONz -RING SECTIONPLAAIOFSrAV.7.4,7.70RA7,'FlAfLEr > o F E. q CITV SrANgARV INLErAWV SWWAL K < a„orxeMWN)VOLE RI)VO&COMER CWS71NCVZFTAILS < 0 O O c. <Z o . o< ,z OWL/NE 7,RAvslrloA,.4 r llvzzlrFoR SECrICA(C-C 4-ORg-STP.Cl1RffAWDCf=ER .......... 7- El mw L------ 8i- PLAN 7.rp,rCry PLAN PLAN u 1reYW,4rDFT41L rYXF-A-AfAMMOLe TYPE WWAMYOUl 'AMNAIMe pe -1 g U (n ZU 7 ,F`� Po..�,�..EH� �,wEM- ,�o ��.a„ II � c �I a Q t EoE C11111 All t va V.1%".1* '=l ro'TUW PLAN VIEW PICKSLOT DETAIL F-- < (9 00 > 0 -FRAME`SECTION S FZ COVER SECTION < C1TVJrTAAWAR,V A?VAVWA YMAMIME SECTION SECTION SECTION 0 R/WV J COMM CASM10 MML MAW VIMANHOLE TYPE 'MANHOLE 7111,111 111-11216 0 <zw < 00 .......... .......... <> 0 A SM7 44 a 66 STR 976 SITE DESCRIPTION - rxwaT en.saw, , 16 A �6—�- e 0 0 a v H v d m}}CL a "s �lui o w w 0 > E ti U 0 F F OZ z i Z O e EM= F >w EM w E, m� a S o w Z N h 0, 0— ~O � O� a — k a O O w ,ov sxa:i ixsrauau EvoU E F AN, AITANO 'ITT "FMTRcouiRo uiHTs�INi a rraus sxu,eE avorEcrEoas rxEvavE ixsrauEo w�.x ac:0RLc - - A ¢> FROM' rvT(HaMRcoTTRED SiiERosnrvcscANNEi¶ic ARE NOT RUMiEo O Es orsoi�s:wueE PaoaEv�rmx.ax Eo.o Euwixw.E oa vEoucESEoiwEx..vaxsaov.rvow.xE Trcio.).¶0 E OF TERMIN TIO a p cE.o.Ho SEPARATE PAYMENT WILL RE MADE FOR STAN PERMITS. � F m 45 0/ 66 FFfaRa aP.Y11Na Na. STR 976 ............. ............ El (M5 ............ El F1 w w I.-c-t-t--ss >w F1 ...... ' ZOLL F11 F1 1--c--c--1 O o I.- ❑-p- -W E] I-d w Ell sm7 46 a 66 RFfGRR OPINING NG. g STR 976 EER D NOTE FE— III FE— �EaTaTv TTEa.aae �� Ea " ,n.aT �� oe� �P1�c1�",f TEMPORARY FILTER FABRIC CURB INLET-PLAN MANHOLE-PLAN INLET PROTECTION DETAIL w ��e TEMPORARY SEDIMENT CONTROL FENCE DETAIL rA 1E 1 n.Eo To y cau.F.�ss E"oET To VI RATE Oc ms�" aM<Eae"mE w+"TEs, E s.vx+E rvi v."vm.nom.w�a.Mme. e.TCE°+Gaffe. A U~o ``.wc sTaocToaE °0M'"� ROCKFILTER DAMAT EARTHEN BOTTOM CHANNEL > E rana To> noT To sckE E.�snw ca `o.",�»�.wA V o e ss IDLE waE..0 Ifs --E oaaoc Rv oc w. M z O i µc amT roo. owaT os Hi 011E"� o PLAN CURB INLET PROTECT/ON DETAIL SECTION A-A STABILIZED CONSTRUCT/ON ENTRANCE Q F a z sues—F "oT-o sum T To sem o I'll p O ro ko w To .T c TEM"aoe - s a a a.r soesrnuTE.Tx. ' ..r oRaa.cc 9 ao oowasTau TaT rvaeE�T,Pi nor 11TIE ,-_,.- `v EM. a a0 O � snow T.E TOP -' O� r a, -acceszEo ` oT E Maaoo s usev" o ssn MrwT co"moE� so cT.,.. <<. 1,�., E� to-E. wess. s`. LEE _ .ar c - x0 IF I —E1111 e T� m encu T e EE o E e ck",w�Ta c.; - .w"T ao aho m eE or THE oMEas o"s - '11�2EN Tl o Eo wEa aac a ov roc'F ncros . n aw r rn <�h�wE caasw�cna"ss. -e a oa..w,.�swm-c 5 SHEET 4�o/ 66 s a co "ram ��_ oa s m E,Tawu am Paoa To .o✓T E oa oy.EeaEs ca�T - Ea NEGLTnT Em.) FFfORO OP.YIINC N0. a ax zxx, �,.eE uooT�er TaE�na�a � STR 9 76 �rnE�naTa=�aa=T=T a aaETa�=aEET= Taoa=EaEoaa=E P�� TOTa=Pao,E�Ta.TaE — aEE.�TEaEaoTaEaT�TOE�m�.TaEPao,E�T=PE��E���.Eoa�no.�.TaEnT,�a,��a � �,,,�,I,�„a PR5IECI M.,�„ NO 10 ,,,. —�- a s � I F - f/� `u a Q U 01 ��".�"„s�oF."=„o.�s �.=�a"= �.=aa"= 10 +� r 10 �� z a � Z w U) NLU LLI � o p a = � ko a J J p0 w 1.4 1� a SM748of 66 RFfGRR OPINING NG. .m_DwF.e. STR 976 � GRY PRORYI�,�,a 6W LLI LLI M A T C H L I N E STA 1 + 33.8-5 411 . .................. - ----- ti z a o w 0 F o 0 0. 0 0 w 9 sm7 49 of 66 RFfGRR OPINING NG. STR 976 1a0loll ""_ PROPOSED HMACP AT PROPOSED CURB 11 IIZI-11�. °°,mow,"°,°,an, ,",—,"a,"„°"re°° °°rem,°°°�°re,",�re°r°�11°",°.°1-1 T CAL FLEXIBLE AND GUTTER ""a„°,",-„1"°1-„° AVEMENT SECTION i+-rz-v[rec[m°r°niuuu uois,urz c°m[m. sc”"s"x,r s�sxieis a+ss m"anr�m,o se-a�xsx,"omnm a"or�w o�xs,r�.nu i"x"w�"�rns r"o" 3 m p ,.,.rzwnx 11-1a+re wu,°[°s[o,o P-111.P1111011111nre°° o oi ,iory c,xreoucx rv°zn[s,o areoouc[a uwroreu cw11 T 11,11, z-irvcu [ououm°+ H °POIns omorw w ` asp nui,o u,x,"u,mor(o K"s'w E"µ"xo°mnxi.,iox z°iwi" [x'srao"Sw ro wnx Som sz o""n�"o°FOFxssF mo o�o"o,a"x 'ovS°' — z° u s ni"c mc[ "' n°°nprwi iuvre u°mnrnno"s,°,xe re[°wrew[ms. "us�vre °nw s„a"s[-creno[o xm-wx nsa�wi,. l o [[p"��F l "Ill 1— 111 IPHIII. MA ,.s. wnu rv°zn[mw y"wroure,, bznss[sre",uo"rx�a"aou�o,u°c"[e°oa�t"s °reu�"a °' Al � ii ✓✓✓,Yk ore:owirvcs011111M I.-I w t a ° . i � ,i., ,� "s�bren ° oN°°aow"°s rm a,°n rerere°w�".,"�re6� "°�""„12 re� „°�re«m E, °�. PROPOSED HMACP AT PROPOSED RIBBON 4 PROPOSED HMACP WITH NO CURB m I I'LL p"'N IZW ACL ,Pre.y m a H }} x �alui°� o ws swat e, L U m� � > Dore Prey°re,°,�awµa. o "`"`a°,,."" ", """" plZm`° "" PROPOSED HMACP TO EXISTING RIGID PAVING E IOLILUI. 101-1111 111-1,111-1, ��� .�� ✓,,,.�v� 5 PROPOSED HMACP TO EXISTING HMACP 1 A'1,11 PM PIl D-1111rE°H°r°oma�,�, area re,o are°°"°reowl"� z w 8 HMACP REPAIR FOR UTILITY CUT w— o PROPOSED HMACP TO BUILDING FOUNDATION �S G o z m o z wLL O w w areoaoa,re "wa °i"�° rN rsl�"°"aR"�M,o rorere w Q a> a w m ns pmuiac P LL 11 "1111111°ui°sr,x nu l°.1110 or rnuau„o zsxwmn nn:w�`Mor o Preo�ore ° aac w,raw wnu as_111, 5 SHR7 SO of 66 FFfORO OP.YIINC N0. FULL DEPTH HMACP REPAIR STR 976 � crtr anarcr f rmra nEre Nrvrz,w°"°re"�"res s"En�,�n",�°ry°..rv°�ry°° re°s ° "cs ,�«,°s �.°E,IEE,rv,,°„°w�rvc w�°rvow.w�� «,„ Pre '7 °rerere OE El TYPICAL THICKENED EDGE -°°E°, �°„,rv�rv,rvE a°°rem° �y..N✓Y>> „°,�� o9`,RG E'GET° � ry«w ry Nil s° °I:E' mos°��M"re°a°°°��re ..ry°,�rv°ro � �� �E 11 " °re°,ry°r”,°-PEreE, ,°.,-ff�Erv, 0—IM ry°�°re,rz°rv„. EEEK µ°rerew,sem,°�s n,re IE"°P.KrvE 'IN MIM'LEW°°sw,rv°,°E a ,rvE ��rvarz",E°Pre°°°rz, rz°°rvm,°°°E°ry°",I 2° °°rz�crvE°M°s,w,° s — w,E ff.E PEre rvoti°Eon°reEreE reEE°rvrvErvoe,��,E°rv,EEE o,.,�E,�ry°�°.,�° E o� 1 ICAL RIGID PAVEMENT SECTION w _ lilt EH, ar°PE WRHrz°MErv, Ery�„ry n„„�.�°.° °rorvn.�,°��s 10°�°rv�°°�°reEreS reErorvrv�°",°rvs ry vrvcs y EE E NI E LE°�s °�°n°°,°P�P�� Piss°reaE°arre�°w�°ry,ry°cry ry°u„n,°P�°°rzE<°rvs,°rery roP,re�Ecreme,s �,. a,�°rv�wE°E rvttA °m��rv�,°ry °a°ry-°gym -�” µ°�,°ry ,a°rv-°°wm"m-" °rery°°1re-1°"rz,°,ry°rem°�re�°Ms. 4 TYPICAL EDGE AT UNPAVED EDGE 1,1 HI-11 1- EIE IIINIIETE' N01M No" 'LE 1E ° 711,1. °E,11 MF —11N 11L INNIE WIH T- .°°t°—,E—rvErv,.°"P,re—°sw,rv,.°rv° s 1E111E1 I „��° ° ry,°E N m°,re s<rv�rv�ry°ry�,<-�rvrzrvEs �, ,."�. wa,�°ry—°E srv°mry—L eaa 1EIrvI—ErvEN'IN-11-1E w°rv, -M°w,-u«w,wE rz u<wrerv,a"°I nEI L IL 1E 11EE1 Lr„a a«re'11:E.IL111, Rw,RE" Gre,rvPR<<ry re °R,E o ,E noRw ff° PROPOSED EDGE WITH CURB 1-1 ILL AND GUTTER oxMeosaoNs °1}}s Q „°E-, a �lui o x w °”w� w�mry re.6�-re°I%L n°rvEw°�w°rv,rvE�� °re E°E rz�nE�� °Ere° ��, ,rvE �1"°ry,°�rv, rerery°Ervsr,„w reEsmre�ry°Erv,�-°°,°m,rewE��°re w°��s,E°�,rvE ow. o --"re°ry°ry <. °ry rarvPrz���°,°°°-"��", a°"�,°re. �re ,.srv�°,° �°rrvc °,<<,w NH Irv°Irv,°E.��rvc � E "nry,�„s <E.rz„o„P� °,„"°°Ere°°re n° °°,,w°"°E°c, "re" ",°—IT--11-°re T, 5 TYPICAL TIE TO EXISTING RIGID PAVEMENT EFrv„mow,°E �„°sem, a ~� TE-1 u zx ",rv,°,Pry°"PreoKws.,re,ry rz".°:,s re„°L,�"re,�"�,M,�,s,°reE°�°. ETE Pu<°Erv, a re sPa„ire,�,E—,°—E—LE”"°°rv, x �i 1101 T� o� E., SE W, Hoo, T.- sem, _ a o w E. - D,o P°o"°,rz°rvs,°"�,sL_," Po�M,°L.Po�M,�" °ry,"E rzwrvcs. z E°E PL-- w Z w ' Mreo�i o`�'M:,°AwEE»��";a E-N"'-I III P�o�'°;rvo aoPre�E.10oP Kre�ry o F w Q '. IL IE— I P0 E LL -°ry,reE ore"w�ry°s°re reP,reE°,re fCE°E ra"rzreE,��ry w�°�reEE,�o"s.°"SEs:1EN11rea"E",-1 THI°°°re F p1 0 Ess°reme�Xo�w,s ko z¢ - - ry°ry-3o-�N w DIMENSIONS rvo„°sEkE a a U ° ESEE"orenvnrvcsxcs Lsx¢r 51 of 66 Pmrtucm aceta roomoxv a etre w,rz-wcx a FFfORO OP.YIINC N0. 6TYPICAL TIE TO PROPOSED FLEXIBLE PAVEMENT S7 976 "°�,°tt"` � crtr anarcr f rmra rary=P .,,,_rv�ry rv�rvwo<orE.:srvoP.Kw,�rn,o�wry ° '"h, `�`n�`oc�oa°orv��`w�u G����cz Aaoorv�rvoo,�orv��worv�E.P„rv��ar oo�o° ° Pery '' a�„oa�GOK,�.,��a .E�wrv.P <rv° E' ° < orvwwxx.Ku�rnPrvorv,o,arvoe,arvPoory.�rv..a�.�P�rvcismc,orvrvoe,ary �";�•• _�- L11 11111�. gl 1-1—111.o 1-1111 101.,—10.o1-111111111 11,ry 1Z 111 oll P.K°.M° I g � 111. �ry°� ”— °°��rv°�°rv�� ry �Erv�w��G. °rv�aErv�M=a G °xmEo sioNs orv. �ory Irv,°�,.,�ory rv�ry �sory�o�rv, P�rv� °°� PlIrv. 11 TYPICAL AT BUILDING w mm PSP oP wrv" rvus ��a TYPICAL AT BUILDING �rvmEo sI�ONS 1 TYPICAL TIE TO EXISTING HMACP 2 FOUNDATION — TYPE A FOUNDATION — TYPE B . s — lrvrv�..PPrvs�°ry m - - �°ry ..��.rv>�. . _ �rv,o a v z�. .�rv..°rv<<PP 1Mry 21.�rvo��,.o 01"1 '"" III a °orv...o .1— oorvo rv.— °11—ry 1,rv. 0 i rP�a.�ry o«ry°oorvoxs ,-P rv.M,°�°wHP�as P.re°re 111 P.re°reaw�ry°s U 6 TYPICAL CONTRACTION JOINT orv�P�rv,�, .na rvPrv,rvE.rv. Prv�M - °�rv,sPoaM Pry J.srvrv°�M°,°�ry °ry aR"-E.P.��° -2 � ROD 11 Poop°- I.—Prv°�-<,o Ti-NI w° o 4 TYPICAL REINFORCEMENT AT CONCRETE PANEL CORNER 5 TYPICAL EXPANSION JOINT DETAIL EXPANSION JOINT SEALry°.°rv«�orvoErv�orv, ow a Z 0 ¢0 z O U� 8 S SHR7,J2 0/ 66 FFfORO OP.YIINC N0. „� STR 976 CONSUL,Y9 SHE[i PA21ECi M.,900.1, SUMMARY OF CONCRETE DRIVEWAYS CONCRETE PA VEMENr ASPHAL TPA VEMENr WITH 9 CURS wirme-ega STATION 'I- DIMENSION'13' EIMENS�O, WDTH W' DIMENSION'C' -E) -E� (FT. 11 11 oa 77, o7 IEE—E I CON—c— ..T D-1) —R, of —11E DID PLAN (M5 aga coove,errEPAYEArow, .4sphALrpAvEmzwr WIrMe-CURS oaivEmnv-T. I ........... —El ED L > 0— �N` C.NC— .0 IT. < 0— 0 WF C) DO R < 0 0 L 'IT 0 <> 0 ITD CURB GUTTER C) 2 PLAN sHa753 a 66 ORM-MAYM171f MF7ACM"SIAWWALK 1 '111 —D ON E-7�'CE —DEI STR 976 xoT To I—E I TYPE OF DRIVEWAY D E 7H,7 R�7, CONDITIONS. TmL/"NTX E.`= =z -uor MEw c octan.xxry -.Tj 140 "(41 .111171= 6' —T lllXP mea SECTIOsU<o noN ffR1VBWW Y 077JV MOO 51OWWWA' T 1�—1 ,rTl —c, T VI i 'ILL IIIALT Z 03 IEL 12' 12" SECTION GONG.0)V1VFWA) ;'0 I—E 11 "T1 ..... 6 0< 1-T J O —T "IT. <> 10 (.—ETE—E-1) 1.— 0 Torr. P-M- PLAN SECTION °R_C_ T To 1-1 oT T.1-1 S sxcr 54 0/ 66 2 STANDARD DRIVEWAY DIMENSION PRyR1 � � oow uPu+soxNoxn cmm� 11E (rr.) (n.) (n.) °` MyWoa 5-10 to"sf RQ Tx x �ax10 6-35 _ m reiai ,r w< aaco is/m tw/z� s ccwa s m " e`omP� ,/.E.P.xsax co�xr mP� �T� cP.. neap s m �T w<�s`omPi curt LI-E,or ��� No swLL .c caecTlEl �LECENDx(D4VETYPE) Is u tae TYPE/C/OR/VE�Y.4Y TYPE/S/OR/VE{Y.dY - _ x,T To sus ..T To sc.aF 'z 1-11 D11-11 w� rvz� own�xs °e' ow�sru. + _ CL (M5 U o aRe TYPES/TANK/&/TAUS/OR/VEWAK E .T To succ U 0 n .3/T in cx>.xs�ox _ nm) xTI w i MA� Al — F ¢ mc.or aim o F F O z ¢O LIF) c�.xa.� cry t ws. iaM mPisax ¢p U e TYPES/MRA/B/MCA/OR/VE{Y.4Y TYPES/61RB/B 1AWRI PRIVE{Y.4Y p O ¢ xoT To s..s xaT To sins U¢ OU ¢> O U� 8 � U S SHEET SS o/ 66 FFfORO OP.YIINC N0. ��ro.oxP�=�xx�=T�=T�o�ooETa�=xEET�=�Txox�=Eo.ox�=E P�� TOTx�=Pxo,E�Ta.TxE s STR 976 �oxTx�==xEETxa�x aEEx�TExEooTxExT�To.���xTxEPxo,E�T=PE��.���x.ox�T�ox�xTxET�T,�a,��k � �,,,�,�,�„a RF.DE NI D- I 11A D"NING, SlEl$101 110,01 HE"RRG Dr .I E $PEC5 FIF 1-1 F,T(DE) N.I. FIT s)IN, N H,=, MANHOLE REQUIREMENTS reEOvireEo "ETE HIRE I I I 3L��FIT NCR`FC0,R(IRTOUDF PRE DAIETER ..,O,E DIAIETER AD,_ AD,_ I.D.IR ION—D.Lll HIRUID1 RII FOR 11111T I AEIG0 O_E PEMR REITURCE.Ell 3-#IT M13) AITI E COICTO OF CORM L 1-1 ION-E TO TUI I' -, -NO IlTll El I IN I p.lN IT.. IN .11 111I-.EEOTOETFIF�1�1, APPROVED COATINGS TARE L(T� I �EO AN11=_N I — 'HE%=ZI IDE"_' I F, BE E.._E.HAD �ETER I ITHELL TH11. THE FINAL B4CKFLL 0 MITE" F'TH`E'EZINI "I,H,"ART... (T.U.-TEO-TYPE Iau AE =&NEED 0 RAUDN..IN. D.D(I E D.11 IF IRAIE-)IN NO E.E OUNTL ll.ENTE/D1) TIT E TH-EIS 11 THE1 11 E TH1,1,11 11 1 ` 11 T Ex IT NO THl,l'I U D �IT NO UII OF THE_TUD UI OF REOP Ull HER EFTS 70 DRX ST)P-1 - 0 1 1�ILL 11NIFIT-SIFT-IC-Ilu.1H soup 1011,T 11 HOl., TADT`DDHC ADD-E _=E ELL IV DUE DUE -FLOWA-LE ELL 12 IIIIST 111'11-E I'lTI vin EDF IF _��2 H H 11AILL FLO-8FLELFALIM (111 PD1 IN 1 11 IAIS� 'E I LUH`RT (I.ISI.'IT 2F-E) EEE HIII E L EAL DET 7 F.I.111 'RE D,�" F011 10—FOUND- -LIHOT E— I, I ES TlIlKH ED) INENT FINEESSDGE)M OF ,, T/ - - T I ENGINEER 'r .Dl,�,�EER ORE.HER " 14E.IR.11,111P DF11I T.AT 7 T.D.T D D I REQ11-III"RENT -7 + EDURE. .,N:I GF.HRD-M i ID DUN—11 RaNr IIIII 111DIEDI FIE TO 12 IT ......T T" FIE-D698 0 I�F EN, IT FII 1-TW&I.7 H'. OIT111. OIElU OR 011 1asTM D698 -2 -D.F, 2 FIBERGLASS MANHOLE CONCRETE MANHOLE NOT 70 SCAUE NOT 70 REM. ED-TO ORIN .NTLET' t'L E DE cont.DCOLLAF 10 'S UEUDE FIEID HER. 110I'LOE' FT To I F I I I _'T DEPOSITIONT T.FOR N"L"""')) DF- OF 11.EIT 11A.-FIRE OR COHICI I IF -1 HIlFS71ENT , . - IR co I'T Ell U' ,11 FIE 1 E .1 FIRE -1.T'I'AL GE.ENI �l rlEH ORAIE D /`�l HE GO 1 H`DTEDN ..j" �SILL 11L 1 11 1 1 Gl 111, U..EST 2 IIE,Tlj�l E Ezi DONDRETE U, NIEIT A T_E� F.I ,.H LIE WASTEWATER MANHOLE(BOTTOM) PIPE SEAL DETAIL >U, T El IT 12' xn NOT 70 SCALEEEND HIT TO MANHOLE PROTECTION IN UNPAVED AREAS SEEE ED w, DO D", loRcE GENERAL WASTEWATER CONSTRUCTION NOTES (CULTIVATED/SPECIAL) < MaN E7 ro-E o o 1111� III-INI'I-INI LIIAL CON'To" Of 'M 1E ITNT_11II_I F`E��1�11TI�l�HITl IN T 3 HE III TO BE 'El -1 Al�TEEN_F`E THE 18'coCOND COL HDIE ADURE-17 RINGS ED o -T CTOR D�IIT III-HE 11ITEIT 11D 3 cILL-A-E IF ALL THE < ""RA". MI FE E-TNTEITH HUElIT'TIT'I o D lNZSEClrTMIlEl TN USE OF N o TIT T��TOR1 11-1 TI II IITI,RTIT-011'TH�1, 11 TH-1 211 1 Of U T_`eENoIENFT 11 Ell-TC11 MIIIIIL Il IN F' L T I THE IIHT�� lI I I-EIRE Fll AL__11FFl__NIII TIT IIHEII TO THE IRA\ L L�,,IFMHI HIIIIM FINISH GROUND OELL III INIII T"I'l"I TIDE' TT NO 1— Dl I SHUll GROU I IIAMI-11 1I,,Al,1,11,FTHE... IDE�DDNITD E -IF-OR L D 0 F.E.- E TO LIE IGP-'IEEIEl FOR c. I TIE FIBEI-Il 1-L I THE"�D F%NHlTI.,l,,IlNll E,11EI�,I�T�N GlHHNI, N.-DO- (.N.H.) I THE COI`TINIll'COlDS114%pZL`%"`TMA��CIIY12AZTLYXI MANHOLE PROTECTION IN UNPAVED AREAS T 11,T DIIECTION SUI-Es F TO, EHETNeH07'IT AUHEREE FATHX�NLETA�CLILURER FEERG I M"T'L I W`WE—HT TO FORCE MAIN DISCHARGE MANHOLE DETAIL IDDIIIEll T FlI IN, MH E, (RESIDENTIAL) IIALE NOT TO S.LF N.TO 'p,_DHE M"_ I E 2 lc-- 11TRI111-TITINTI 1 7-IITPRTTlAI nI—R.Ea:oR,I'lP Uo EIR-°SSE PIR. rREaa aEnSI °R EwEn.° Iia=,°E , ow� r°r E POP°E c°aEEEOR, �PE I—E a°o°=s coucaErE h xx 1r 1 .11 11 11 10111 T 11 1 ncvE —1 R11°E nry—.T. } uA—LE s_ SEAL a 11—utouu°Exisr 11—-1F uurE aoPE nuo cnEuiuL,sour El Ex R. 5 OE. smxs or EE>—/n1 �0 (Exec B axttOa) \\ M Mxuss P °.o ` I w E _BLE III w -) \\ °ox,Ec.oN�I�°o:°ro;°�i t B. ———— oR� —PPE 1AaE wA.EaSEE PIPE E—RE-1 .°P�_EMe. \Pa°P E.�mPo a nj ro REM.»P Pa°E (unr o°I 1.SAIIII °o nlI o,o I,00 Ps Mti.A za i °PEa.E° ..o ELI Rix°E°aR»rn srxnLESE s�� r acp OR EEa�co oa a Pao°E°R a U a R 0 E o c III}}�N a° u' PR°P°sE°Fl NSERr 11.LSE° °a slut o w w IS E.s.n°°°°R E P RENIN E«w E�FlL U o FRP INSERT REHABILITATION OF EXISTING MANHOLE FRP INSERT PIPE SEAL DETAIL o 11 TO—LE xor ro—LE > E ti U o L—IRS (p oiw uEuIPLI �uz ',/z^ccose°PcxR°EEs EocE or a xc —I UI N ^ F s E E O F =� Coa �F U_ \ d So j W COVER PLAN VIEW .P„ a o o� ow / A NFLOW INHIBITDRk o o /o°uTRINE rPoaEN IE nc P`ER RP i — ¢a0 >w 11-1-7 Uw Ull— Q> O O r,_ _ sPEC Flcanons � U E, PER MnRVFn°LURER =a€ ��� ="ac°E zo onucn_a E SHEET S °/ 66 .� - FFf4R0 OP.YIINC N0. - SECTION OF RING&COVER RING&COVER APPROVED LIST - STR 976 xo m S-1 a •w � crtr anarcr f,mra "WEE SATI11L PER AINN-1--\ APP OVED ARVs PEOlIREl— "'I"'"R NG COVER B,—E ATFR- ETA—"',(EA) 11 111, 0 M" r6T— I INNNI TEO uoDEL 966 1.SE ALL—"EF' IORI"'T VE I, LEAL TO PRO'ONT ANS A V.APAS 51MIL'TIL—C TESTING IRS BE AS.TO lElEl ST111111 I LIC 011 I—RETEE-EAl-OlT OF CEIEIT/M LIA. —AIL ';HA 1-I—LL STEEL IIIRIW.. NROV.E E.N=I=B= -NBAIE A�I FE---14 CA-L(361)82'-Cl NITIL NET E�STM PRIDIEE 1-C-ILENBACIFIll IOLGE 0'S N LILL ANDITIVE APPR T TEE CO-01 Cl— �S I NO Geos PSI 'a A�ICTOM"F rl ILI H STLII-15� —1 IL- 12 CLEAR IN IOCO"I co 1 P —L FILE.—AS PIPIN. P-1.,I— SIDE VIEW 'E. L — FRONT VIEW 1.1 ITILARI 1.111ON —TILY, I I'm "I ——IT11TTION 1— BOLLARD DETAIL DEEP CUT SERVICE CONNECTION CRB—STY D 698 AT T3C 'M"M 'SA TT AIR RELEASE VALVE AND MANHOLE NOT TO SCALE NOT TO—LI CL CIS NOT TO ALI ol a OF ORE EM SERVICE CONNECTION NOTES: I CONT -TNA TO'NOVIDE SERVICE CONNEOTION TAP TO 10 111.L It P�T"INT"W'E",'NTS DE EACEAI'W AS"I ANN INE "E"A 'EMCE PP f I LL IS I E AND FITTINGS TO BE SOLVENT AELD SCI 11 IS 1 1/2'BIA (9 —I lR.IEE El— TIR—E.FL-A QESE STI�OG*"O."ERRIBIAND/Ol V11 LIFE LTI— 0 P. _ _ RE =U- lElr/PEEI�LAIE 3 DEPARTICIT APPROVED CONNECTORs/A AS SON, 1,F I NE 11 IIN INS SEWCE,ISE PVC WE OR TEE�S EIRESTEE�T w 0 " 4�)— 0 EW.E I...OLON A 5,IF PIPE LE—,ON SEWICE LINE,IS GREATER—5).ISE 6'PVC �wo I VDESr— KI AC FNIM—NIlT WE TO THE VAIN LINE, —E PC < PR As N ES D P E So- o IS E, I= I, w- W 0 C)W —N A.I-1 10 OF——1 1 PLAN CLEAN-OUT BOOT I.LIETE -Al RENN IIIE'I OICl'Vl."l'lE.011 <0�o 1, M R.NOT TO SCALE "or TO I—E R 'T'LPENE.) IFRNI. I STEEL E—I NI..1 IR PROVIDE SPIN �P 09— AVE .. SO SrvOw" I- A. ANN— ,/A_ 51 A "T'ATE1 ll'�I/oRECEI�-IA'LI'IE, M,—" l\pll�-\lll Cl TIE IT_S OR LNII OR III I.ION 13-13 2 'N. ... . POLI 1POTECTTON'I"Cl.IONI�Zl—*lTI SECTION A-A SECTION H'NS NOT TO I— WT TO IIALF SERVICE CONNECTION DETAILS STANDARD SERVICE MARKER TYPICAL CAST IRON CLEAN-OUT BOOT NOT TO SCILE BRASS ONE °u ED M.STREET TAP NOT TO SOPILE NOT To SCA-E UEONM I_I.,CC�1. BE IN PEALEFF I STAINIIIS STIET E=- N LESS FLAN PUP T.-NECE P,F-I NPIFT1 CLUT I CUT -E11 WELDED STEEL OR CAST-qE .1 CR NG IS RD"NBE E 'PIALL �a I.E.,S1.1 F.FENIF SEE TANT,FER I.—SE ITASTIC II.—S 112'INT ...PIT, ws IS—D—1 ATEIL�l 4"TO 10"CASING DETAIL 11`� 1, 1 TI;T=E SE 28)E NEESO=E LIPS NOT TO-E -1 IN -1-L1 -,F TI BAES, RAPIFU(_PEALL El�11_F I-FI 1. 1.1 SAIIE1'T L-1 I-D 11 STAINLESS STE E' PEE L E'1,Cl 'NOTE CT—LE IS FPS'N. .BIDS.SPEEL E CAST 'ELECT M-FROM I-INI,A T I, "EP '111LTL PL11-11—I, EX—RION 01 EORTED 1-1 11IN111 M'IAT�IIDIIA�1,1�"I A T'�'1'1TIIIINITIILITIINIF IIIILITY T11 IS TE S F -`LLAI IIL1111E1E ONCE'U_ : �N'1 1111 TE 1NL1LFIF 11.115-11N 12 TO 36''CASING DETAIL NOT L.SEA_, -11 IT 11-1 11 1 1,1111 11 I"ORA. IF 1-L1-1—IN-11rT111 I LIII� 11GTN P 11ILL-11 SEE NOTE 5 1,1 FIT 1 11 IIIE DIA 2 �U LIT,,"Ill,"��,",�,IIINI,1,1,1,'IT"1,1,1,11TIONIN1111, 1 1,1—11 U� E CASEC SPACER SUMBE SPACEE A E, MAxMLMIF ONE_T EBC.SCIN TRENCH BACKFILL FOR WASTEWATER LINES SIDE IF low CASING DETAIL AND PAVEMENT REPAIR FOR UTILITIES NOT M-E GENERAL NOTES FOR BACKFILL TA1BILI TA BEDDING AN.INITIAL FINAL BACKFILL (BELOW PIPE TO IT A E) (GREATER THAN 12"ABOVE PIPE) UNPAVED AREAS PAVED AREAS 11" F�ILL,'L, �L,I,'L"'I- I ;LLF—I L E III TP A 'FEMY�12 FABIVE FA�,�TO,3 AS— 11jIL-FILL _ I "A AFIFILL IFALL IS IIIIECTE1111AL IN 77'E'-E COIP171M IF UTIIE PIT111L 11Y1 C1 SPND'C-1L IF YETERA, SILEIT IIIIIAL—M R lR.U11EE IF CRIJ311IF NATTRAL-1 OF C—EF 1 1,1 ALEY11PLL_TH CASING NOTES: -.RICKS, l CIL IE- LLISIowlrvc o 1 N.T.,-N,ANC ASELF THES—I SIALL BE FEE IIIIECT (D E—".A.tl Z`°'N USIL—1 T LEE—111 EPT%,EHEFE IT,IN PIN'PLERI 1 2-PA. > N=.. SETS*'CEEEU'E BE IF IS 2 ALL CARS ER I PEE INSTALLEU CAIINCS SNALL I S111PINTED BY R.U STELF I..— o -G SIACERE(�CEC IIOD1CTE-01 APPROOEI 1111L) 1111OP PINEIINIPIENTSE IF 12AA1 FIR, '.rACF M'.2.'ITY IRCITIC E, m�w ..I—MATI(ossa). LAI TE L) I T"I C11TI1CT1R 11ALL 1 1111 M=E CALF�1�1 'A.N�ETI,1. "F`E PC IEC OPATAINS ONLY I R, I" RECALL STD.RREETCR EF EPA N R 1 5 P R El 1. Ep Em MOISTURE TO BE:LITED TO LD-027'"TA1T�_F`-``-UN EA, M evNCM K N�SPACER1 P—L BE S ZED TO SECURELY F""`TO THE BER'PE 0 1 SA Q AND SLALL BE TURN I",'T, '11NER'ECTE TO NESIN'EPAR" ".,EI",U_ ZR ON INC N 1 3%IF oRT1111, RZ�E.�E..�r TEEN III 11.EIT < U.IF 01 PIPE IARIIEI IIE-I TPE—I BASAD,,D'TII STAN', o- o w P THE SPACERS SHALL EI—E TEST PIPE CARIER IIEE IS A TOISSIL TO BE I—ES. SEE TABLE 2-17E.A R- Of o c)UE 0'�IMIIE�PPOF_T.......I US EFY PA EYE IT -C 1—END SHALL NOT BE PERTNER T.1 12'FROM THE SED P1SF—(P) II TO 1C MAx. ...IL .I PUTO.I F R..RASE T. IF FILE KAISDIS TOPSOIL DEPTI, B.-M OF 1—.11 o I IASIC�'�" FILED INERT,E,HLNLTFRE OF FIEFF PIP E I EPTI C N. AU N� T`CEES P-BE NSTA 'I""El 111AV`T.. OR`ELOORA.TTE1.'N TABLE.USE IIIIIPED TTCF",P` TL _IF KIII < TIE IAI I"11AI 11 IF TIE CAS NO PRI T.N,PC PC 11HEC-11L MEETU P, =C(�51BEIEMEPT SIPE o I PPI ESPSTLI"TN'I.IUDNEI,III 1PAPT 11�itIFI* A%111AYIE1 T"K I Esso( E.6R'.`E`DN1TR�"I I'TE A.PINCREFTE CCAE11 AS.RE—E.T- .—E 2. BE PERI EOC ANC SNALL REST PIPE'EL— 'o AS 'PER I NC SEAL, IS 7 1 All—FETA OR -F"`ET"CD TOPPacED So" NIQUI= J Urn —11 11 71 11 E, > T-1) R.C1YU-PER I—ITEM PIT GRACE 2.3,OR 11* 21 11* P, 11-10 2 S sxcr 59 Di 66 BE_U—�PDSTIl IF DIEN 111STURE TO TO(1/ )OF.1IMU. IZ L -1 BARS "0" L_ i04cu __-J L A' P1 AN aFr SrANVARV INZ Er PL.4,VMrP0SrhVL&Fr 4. &AQTL I-T1 ll1113— IT-----Ir NlC/ are awa„ 0.7 10 LIT1 lN PLAN VIEW GRATE BLOCK 1_A AI or All w.r.s I N € e PICKSLOT DETAILB > -14)1-1.1 0 F U�w GRATE SECTION RING SECTION NII To 1-1 o 4�lI 4;eA' 0 0. f 14-e9 c C1r)1Sr,4,V,9.4R,91,VLF7'AW,0 SIMMLIr 11 11 11"11 - o 0 FA`15""""�_�" sr vR�rr AMAINMERIM6,9 COVER CAST/NG 19-FrAILS I Al 1I 0< 0 2E INIET AND 0 SIDE-1 MANICLE RING&ER NOTE A, w nrss >w 4.11.wlla, 9 sHa760 If 66 FL OWL/NE MAMSIZIOWAF rINLErAOR OR 9 S7,'O.CURBAM9 GUTTER S.Ferlolve-c 9 11 NO- STR 976 4 I NNl NRE 7 L--————1— 2 6611 z �I. -E, -D. SIM am. SIM. J AIR 11"1 Ill AIR R�R1,51�ZII .R IT—_R IRD.L. —1— "1..1 —LIAIll x1. T.1-- PLAN PLAN PLAN AfIMIL Trpw _TYP__2F'AMV1fMff rMPE"C'MIMAII V'.VAA'YVL-- .OT ID11 11 1 NI ro—1 xor ro s R.T T.—1 11—D RD-- -11.1DIGI AK,A- 111D--T =0 _ER E COVER < ----—- _11 A, .1.DDIT.. I /A MT,.�l A —1—.1.DF ILI T�11 RR,A_ --—------ PLAN VIEW PICKSLOT DETAIL —,A—1-1, 14 HOR Z, 0 A L,—RU I. fluL - 2- >ED 0 L IT,1-1.DRI. ED A COVER SECTION FRAME SECTION nl 1111 EDT 0 0 sie R F.R s 1 w 0 C) T -,:n. A_�J' ateF7L 1—1.—1— E� I, Itxx or.mei xor T7. .-2-1-1 EA -0 CITYSrAAfffARffR474ffWAJIAMAIY97L-F SECTION SECTION RM r SECTION < �2E 77MRIF 2VAMMMOLE rilpE VIAII =L 00 RIMC&COYER CASMIII rrPEVAf4,VA`I 1-1xo,T.scue I.T T. 50 ED > 0 ROADWAI VIN„OLE�N I Tl DRAINAGE STRUCTLRES: 0 F, T?� 3111 11C 17 sll—ID IR 1�1 ............ 11 DII T 1 —E 11 111EI DID 2 1 11 1 11-11111 IE—Gl21 TA I 1 11 11)lR T.E—11 �NC 1� R TIRI�R IR—ED DIAIL.11TIA I— .. 16-1— SM7 67 66 �h TD _s. FFfORO OP.YRNC N0. A1 11 11,1111 21 STR 976 D xx D cc I I I —.1 1, S `11"'Top oR ,1_1 11 �-E `co`%T_ wooer 2 E.. —T L � PLAN 14.�EL,�OIX2IT --T U R 1-1 CX15—C? EX 1�&E=TTE) N� L�IIET, -m.," - 3 C T E..Tl..C. T CURB 1A%,Fr MROA rFXrENS1OMPLAAl —T- cwo-T � -E =7 El— T�-Ll I.. 2 /�m4 Wo I I REMOMEAMOMEP"C—F TOP PROP.PIPE TO El K/s r1mv, 0FEXISrINV Cl1lTA9'hVU=7'A9F7A L R.C. CONMSC71'ONA '_r7AIL run_-'�I'METE NLI_Tls .17 E.—%,I� we,111E H ,I Rlll SECTION TLZTVLLl UT SECrMYVA-A AWNWOUFRISER AWMAIL 1-- 1— E 10 PIP���I rvor To 1-1 xo,T.1ti — MMMWAR"S PA VEV AR"S 1INPAREVARFAS AWMWAMEWS EXISTI.VaR.C.PIWEPL1119 COMCM&MECOLLARM—FAIL —LE rvo 1.-Ll —IlTI-1—T -—T -11,_. T��E 11—E. I—L To�E P',Z. GENERAL AWrESAORRACIO ILL TAOLL-2 31-Al2'95�-ILL (BELOW PIPE PIPET f7 Q UNPAVED AREAS PAVED AREAS 8_E,.TL IE14TIBTLIE1211 III ITD, 0 3ELEIT—ILL I—E-L —11 'l—T I'll L EllIL TV D II < .TI T1. JL - < p? 0 Z- 51 D: o,."T" 'T 0 0 —T < 0 0 2E C) 0 T� 2- 11—1—T Q.- EITfZOo 2 sHa762 a 66 2 vc s—11 or rR.-AICHOACAMILL co,racr.o ,u 'o 7MMOWN OACAWILL FOR SrOVAf IVA rhRr PIM75 '-O'V-STORAf WA 7"RC'BOX C"V--R75- STR 976 1.Io—E mxsur Ys ss:Er rxwar eD.,saw, WATERO/STR/BUT/ONSY TEiYIGENERAL NOTES SEPARAIYON OFfYATERANO{YASTE{YATER LINES uNPAUEOAREAs PAVEOAAEAE S �o—��� ,o a� W AT ✓ _ of coRPus L _a _ RAL wtu rRw. r s r:rower o Mia .. f of saMs C or R� sm PR"o°�"ro`R°o" i 111 1— ra.s Al„ rs as-T T.�ct�1 M os�l src rheic a u n xL t 3PNCE eo.r n rrrscrnory wro sr RE LOMRACrOR SN � * _., of SERwCE. rbIES. A. PROPOSED SKf :.s N11 C11-11 RUNE �R�cks rcucv%ca r 5. iE5 ( J CROSSJUGS Of ex/SrixG WSARGOvS vRODVCi FLGwUNES. tb 33 saro)C D ro o e LL s I'llr£R d ABLr[1u oiEa a a m CORS �CriO.........,ER CAxECr _ PnuEo suvsAcc s _ �"p cuae a GunEx ar.sL un[au a £IN m n ALL WA ISOu —cc& uesano[ i �F� 6. ME CONrRac 0 ..)s. -L—Il.1� Br ME wa rER O� 1 a1 s'rRE C�ry PRIOR r0 rRE /.F sEE xm[s actow 5 Lr,aw - —:;�uxr ------------------ 11L -L n WAr—ML/NEdf/N/AMW C41MAF RMNAMEAMWTS —q x F= of - i w , 1. All SOLE a v E s,REEr . . :-��"... R°ter`=eeL. <LL _. . +* . Y. ,TERLO wsie au /NE i ( ; 5 u iEo s Asn sI c TAI Il BACMF/LL FOR WA LLW w `T ` o AL_c ,,a ro .L.ru_w,, } E 12 L L _, n.,_ . _. ._. GENE"L)VOTESFORBACMF/LL V a ,s ALL 1, _ _ TRetc i 0 Fl— taFE arc ro tcREnrERrrHarr�z vE� IFI UNPAVED AREAS PAVED AREAS y r _i.„IHos.DXTAE11 11 1 puRcusvrs r - F L unr[mu Pxouc[o er cwunrwc or wrueu smxaZ 2 r-_L_ Eat Lv�s w..cL _ Ll —I Al .u_ .c I v " PEcroR ARo r+Gnn au nfrEcrco cvsrouERs a4 rER nmmL ucnµs rRc rovowwc cwreRu use L L O F =O Rocas ao ut u f_x —I rs.fxr. uff nsry Oz er me 10 M•• .,„.. ,>_ rxocrorz �� U ' nwe acaw.erucxWrs or a rn 3lZ WATEI ..a wrEry aEPrRs sP t� TI"IL ._A.,�L �L. _n rR sw sv cw cw - G F ,s ALL VILI aE nsrALLE1 so rHAr PPE of U.,, ,..KwTs AaE LocarEa ax rRE 1NO ,K��� ro F= ss,L„xrEsr e O z O w 26L ALL-1.11L. A AvcMEnr swAu eE L-we s,�L L,Amt L eELow wnraR Rano ease wts r o-e k o O w s L 1z..x acre cxuwr reec SPEC/AL NOTE.•,. s ff.—cawsE A—LE.nor cLeEER sruLt mmracr wE""Y11R I-0-1 oEPAaruEwr .o s.pArEP„ =A , - ooi<s�� _ ¢>_ jra U� _ �o as rcv cesk':v QarwrenJ a sx¢63 ai 66 FFfaRa aP.Y11Na Na. �rxrtxxPx�Lxx�=r�=r�x�xxEra =xEEr�= rxxx�tExrxxx=E P�� rxrx�=Pxx,E�rx=xE s STR 976 �xxrx�==xEErxA�x xEEx�rExExxrxExr�rxr���xrxEPxx,E�r=PE��r���xrxx�r�xx�xrxEr�r,�x,��k � �„,„�r�,�,w - ,,,.- z,,• p PRwECi eA. saw, a s�r,�aaa�asra 17 uxx, O»�,E q 2 aux s p 0 N �s F m;6 cmox oa me xroa„xr. x.cc z,z,6 cam woc.. ux_ EXTENS/ONOETA/L _ CL x�xroa..,<u,usr u,+anuReru sa,.co c m,.c�-c r,«usr a<a,ecxwo $ �r,ou or s�x.x •F, tl$§ on mx.ca�x $e a F= _ 0 xr i s.xn - eve- i o" � in .wxcaacru�x -w aro" � a U F/RENYOR4NTASSEIfBLYOETA/L/TYPE 1/ z°" t� _ c III}} VAL I,EBOXDETA/L MAL VEBOXOETA/L E CPAVEMENT C NATURAL GROUND �_ B P/CKNOTCN Y ro.rcn,n�e uor,c sc.v< �� o� =o O z Ow w UD ow uw. raises z2.1 caxcxx„xmw a ersax `L r I wa xoc� 00 eonou or me,rroanxr varc(.0✓) - €� J� U Z' y N�s awkas esu sw vc,wane € e�J re U K ,..z L/OOETA/L s sxEET 64 a 66 - F/REHYORANTASSEMSL YOETA/L/TYPEZ/ FFfaRa aP.YwNa Na. _ wnrca uxc ecxwo cuae FIRE HYOR:4NTASSEMBLYDETA/L/TYPEZ/ STR 976 xo,m sc«s sox,xissxee,w„E. a � car anarcr f rmra CAS/NG SPACERS ^,�o, � - ° T P/PE/NSULAT/ONOETA/L ua„c ur ecws WArERMWAO✓OSTMENTOETA/L w I, s1Ta as s°"ce s_ _ •°` oesrcv,"w ev wxrw axsax as°c.me '',e u,+«n«wcnuwarrs d s mea w ��e /NSULATORSPAC/NOOETA/L c .,,xs,�ns i IA— Al ai � TYPICAL CAS/NOOETA/L a U H (M5ag a s oww > E TYPICAL VALVE/NSTALLAT/ON THREE TO SIX IM MR CONNECT/ONS AT/NTERSECT/ONS —Is s.xrzr¢ ws 2'vawE =O zrcn,srxi+cc ra ~ U w o wo Oz Ow _ z suv ox _T, z u.,..nx rcrs O 00 ss k o O w an- :mwrwc �–wxa°mr aas.rc O O F K U c urc E .burr. ana rua0w.vcr Etbow 1 z mE x c �xss so-amw r. S sx¢65 of 66 x°..ss"° DETA/L^B^ .ss rcc.rrrn s.,,as osscs OETA/L-C- r commEerlow C„YCONNECT/ON TESTR/SERASSEMBLY TESTR/SERASSEMBLY z w STR 976 ' � crtr anarcr f rmra _v, �u-uowry a w uuwzxi•��o�W@��z T5� ffAZ45Y Af4,V1r-6WZOC4r1OM PRffJErSff.VM`CFLhVF Af4R1rZW,0WrA1LS SERVICE W177f SIVEWAL A' CWL CW-AF-S4CSEJMME I.T T.11— SERVICEL/NE AfAr-MIALS ',�.o 2—WO ITLZW�� 10,ig— (M5 o A, ��'R9� -VE(BY—2 AfEWYM-F JV171fMFT SIMMALA' socwa TM/CAL COMMECrIMAErAlL 9WrTl�O — A. A-el Ox -0 0 �H:�Snr"R�rr-SroA,�rT 0,1 o w 0 C) 0 w 00 <>w SERVICE W/r)V S/OEWALK .0 TO CURB0 A�ll—11—T - BOLLAROOETA/L TYPICAL cVv)vEcr1z7NffEr41z —WAll DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 00 61 16 PAYMENT BOND BOND NO.0241941 Contractor as Principal Surety Name: Reytec Construction Resources, Inc. Name: Berkley Insurance Company Mailing address (principal place of business): Mailing address(principal place of business): 1901 Hollister 475 STEAMBOAT ROAD,GREENWICH,CT 06830 Houston,Texas 77080 Physical address(principal place of business): 475 STEAMBOAT ROAD,GREENWICH,CT 06830 Owner Name: City of Corpus Christi,Texas Mailing address (principal place of business): Contracts and Procurement Surety is a corporation organized and existing 1201 Leopard Street under the laws of the state of: Delaware Corpus Christi,Texas 78401 By submitting this Bond,Surety affirms its authority to do business in the State of Texas and Contract its license to execute bonds in the State of Texas. Project name and number: Telephone (main number): Project No. 18010A 469-458-8372 Callicoatte Road (Up River to I1-1-37) Telephone(for notice of claim): 469-458-8372 Local AgentforSurety Name: John A.Martinez Award Date of the Contract: October 19, 2021 Address: 25700 Interstate 45 North, Suite 140 Spring,TX 77386 Contract Price: $1,927,197.50 Bond Telephone: 832-941-1813 Email Address: john.martinez@americanglobal.com Date of Bond: October 27, 2021 The address of the surety company to which any (Date of Bond cannot be earlier than Award Date notice of claim should be sent may be obtained of Contract) from the Texas Dept. of Insurance by calling the following toll-free number:1-800-252-3439 Payment Bond Form 006116- 1 18010A Callicoatte Road(Up River to IH-37) 7-8-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Surety and Contractor, intending to be legally bound and obligated to Owner do each cause this Payment Bond to be duly executed on its behalf by its authorized officer, agent or representative. The Principal and Surety bind themselves, and their heirs, administrators, executors,successors and assigns,jointly and severally to this bond. The condition of this obligation is such that if the Contractor as Principal pays all claimants providing labor or materials to him or to a Subcontractor in the prosecution of the Work required by the Contract then this obligation shall be null and void;otherwise the obligation is to remain in full force and effect. Provisions of the bond shall be pursuant to the terms and provisions of Chapter 2253 and Chapter 2269 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter to the same extent as if it were copied at length herein. Venue shall lie exclusively in Nueces County, Texas for any legal action. Contractor as Princi al Reyte�tr R sources, Surety Berkley saran ompany Signature: i Signature: Name: Gregg T. Reyes, Name: Paul Messenger Title: President Title: Attorney-in-Fact Email Address: greyes@rey.net Email Address: Paul.messenger@americanglobal.com (Attach Power of Attorney and place surety seal below) END OF SECTION Payment Bond Form 006116-2 18010A Cal licoatte Road (Up River to I11-37) 7-8-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CEO No.BI-10271d POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON,DELAWARE 73 NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly organized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has made,constituted 03 V and appointed, and does by these presents make, constitute and appoint: John Anthony Martinez; Paul Messenger; Karyn -E Kenvin;Jessica Jackson; or Michael Marino of Anterican Global of Texas, LLC of Spring, TX its true and lawful Attorney-in- Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed One Hundred Million and 00/1.00 U.S. Dollars (U.S.$100,000,000.00), to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. a r. This Power of Attorney shall be construed and enforced in accordance with, and governned by, the laws of the State of Delaware, S >without giving effect to the principles of conflicts of laws thereof. This Power of Attorney is granted pursuant to the following :~ resolutions which were duly and validly adopted at a meeting of the Board of Directors of the Company held on January 25,2010: •^ o c RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chairman of the Board, Chief 0 2 Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant w Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein o to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such 0 o attorney-in-fact and revoke any power of attorney previously granted;and further RESOLVED,that such power of attorney limits the acts of those named therein to the bonds,undertakings, recognizances, E� or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the s manner and to the extent therein stated;and further RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and further �o� ou RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any ° •E power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or M other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as 3 though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any �r .� person or persons who shall have been such officer or officers of the Company,notwithstanding the fact that they may have ao 0. ceased to be such at the time when such instruments shall be issued. YIN 'WITNESS WHEREOF, the Company has caused these presents to,be signed and attested by its appropriate officers dnd its 0 o corporate.seal hereunto affixed this y of &,12 • t. o -14 Attest: Berk] insurance Company CIJ (Scar) BY .... fir—" 4d , Je. I� after oExecutive Vice President K Secretary `.�Se i Vlc e resident o WARNING: THIS T'OGVI?R LtV VALID IF NOT PRINTED ON 13LUE"I3tRKLEY,1 SECURITY PAPER. o STATE OF CONNECTTC.IJT) E COUNTY OF FA.TRFIELD ) 0 N o Sworn to before me, a Notary Public in the State of Connecticut, this c25_1cay of Caj ,by Iia S. Lederman Cand .leffrcy M. l•tafter who are sworn to me to be the Executive Vioe Presidents t Secretory, and t Senior Vice.President, respectively,of Berkley insurance Company. AIARIAO RLINDRAKF4 1 y' NOTARY 4'11111 IG CONNECTICUT MY COMMISSiON EXPIRES "' otal PUlpll State of(!OA.RL'c tlClrt > At HIL 30,2024 o CERTIFICATE C7 as J,the undersigned,Assistant Secretary ofBERKLEY INSURANCE COMPANY,DO R REBY C}EWrfFY that the fore�,omg is a Z true,correct and complete copy of the original.Power of Attorney;that said Power of Altorncy has not been revoked or rescinded and that the authority of the .Attorney-in-Pact set forth the'rcin, woo executed the bond or undertaking to which this Power of .Attorney is attached,is in fill[force and effect as ofthis date. Z� 1� 3 Y Given under rtry handand sell of the Company,this clay c.1f„D_.....__ M , tScal) Vunccut I'.T�or'te DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 00 61 13 PERFORMANCE BOND BOND NO.0241941 Contractor as Principal Surety Name: Reytec Construction Resources, Inc. Name: Berkley Insurance Company Mailing address (principal place of business): Mailing address(principal place of business): 1901 Hollister 475 STEAMBOAT ROAD, GREENWICH, CT 06830 Houston,Texas 77080 Physical address(principal place of business): Owner 475 STEAMBOAT ROAD, GREENWICH, CT 06830 Name: City of Corpus Christi,Texas Mailing address (principal place of business): Contracts and Procurement Surety is a corporation organized and existing 1201 Leopard Street under the laws of the state of: Delaware Corpus Christi,Texas 78401 By submitting this Bond,Surety affirms its authority to do business in the State of Texas and Contract its license to execute bonds in the State of Texas. Project name and number: Telephone (main number): Protect No. 18010A 469-458-8372 Callicoatte Road (Up River to IH-37) Telephone (for notice of claim): 469-458-8372 Local Agent for Surety Name: John A. Martinez Award Date of the Contract: October 19, 2021 Address: 25700 Interstate 45 North, Suite 140 Spring,TX 77386 Contract Price: $1,927,197.50 Bond Telephone: 832-941-1813 Email Address:john.martinez@americanglobal.com Date of Bond: October 27, 2021 The address of the surety company to which any notice of claim should be sent may be obtained (Date of Bond cannot be earlier than Award Date from the Texas Dept. of Insurance by calling the of the Contract) following toll-free number:1-800-252-3439 Performance Bond 006113- 1 18010A Callicoatte Road (Up River to IH-37) 7-8-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 Surety and Contractor, intending to be legally bound and obligated to Owner do each cause this Performance Bond to be duly executed on its behalf by its authorized officer, agent or representative. The Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns,jointly and severally to this bond. The condition of this obligation is such that if the Contractor as Principal faithfully performs the Work required by the Contract then this obligation shall be null and void;otherwise the obligation is to remain in full force and effect. Provisions of the bond shall be pursuant to the terms and provisions of Chapter 2253 and Chapter 2269 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter to the same extent as if it were copied at length herein. Venue shall lie exclusively in Nueces County, Texas for any legal action. Contractor as Principal Reytec construcci esources,Inc. Surety BerkleyIn anc C pany Signature: Signature: l2 Name: Gregg T. Reyes, Name: Paul Messanger Title: President Title: Attorney-in-Fact Email Address: greyes@rey.net Email Address: Paul.messenger@americanglobal.com (Attach Power of Attorney and place surety seal below) END OF SECTION Performance Bond 00 61 13- 2 18010A Callicoatte Road (Up River to I1-1-37) 7-8-2014 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 No.BI-10271d POWER OF ATTORNEY BERKLEY INSURANCE COMPANY WILMINGTON,DELAWARE NOTICE: The warning found elsewhere in this Power of Attorney affects the validity thereof. Please review carefully. ami KNOW ALL MEN BY THESE PRESENTS, that BERKLEY INSURANCE COMPANY (the "Company"), a corporation duly corganized and existing under the laws of the State of Delaware,having its principal office in Greenwich,CT,has made,constituted M V and appointed, and does by these presents make, constitute and appoint: John Anthony Martinez; Pahl Messenger; Karyn " :EKenvin;Jessica Jackson;or Michael Marino of American Global of Texas, LLC of Spring, TX its true and lawful Attorney-in- .E Fact, to sign its name as surety only as delineated below and to execute, seal, acknowledge and deliver any and all bonds and undertakings, with the exception of Financial Guaranty Insurance, providing that no single obligation shall exceed One Hundred �? Million and 00/1.00 U.S. Dollars (U.S3100,000,000.00), to the same extent as if such bonds had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office in their own proper persons. This Power of Attorney shall be construed and enforced in accordance with, and governed by,the laws of the State of Delaware, .3 without giving effect to theprinciples of conflicts of laws thereof. This Power of Attorney is anted pursuant to the following o � g g y !n' P g resolutions which were duly and validly adopted at a meeting of the Board of D rectors of the Company held on January 25,2010: RESOLVED, that, with respect to the Surety business written by Berkley Surety, the Chainnan of the Board, Chief o ° Executive Officer, President or any Vice President of the Company, in conjunction with the Secretary or any Assistant wi Secretary are hereby authorized to execute powers of attorney authorizing and qualifying the attorney-in-fact named therein to execute bonds, undertakings, recognizances, or other suretyship obligations on behalf of the Company, and to affix the corporate seal of the Company to powers of attorney executed pursuant hereto; and said officers may remove any such o attorney-in-fact and revoke any power of attorney previously granted;and further RESOLVED, that such power of attorney limits the acts of those named therein to the bonds,undertakings,recognizances, w or other suretyship obligations specifically named therein, and they have no authority to bind the Company except in the �• manner and to the extent therein stated;and further > RESOLVED, that such power of attorney revokes all previous powers issued on behalf of the attorney-in-fact named; and fl further RESOLVED, that the signature of any authorized officer and the seal of the Company may be affixed by facsimile to any power of attorney or certification thereof authorizing the execution and delivery of any bond, undertaking, recognizance, or CZ other suretyship obligation of the Company;and such signature and seal when so used shall have the same force and effect as 3 though manually affixed. The Company may continue to use for the purposes herein stated the facsimile signature of any person or persons who shall have been such officer or officers of the Company,notwithstanding the fact that they may have C) ceasedto be such at the time when such instruments shall be issued. .E 1N N4V1`INESS WI-TMEME ,E OF, the Catnparry has caused these presents to,be signed and attested by its appropriate officers and its C) corporate.seal here•ua:d:o a[Crxecl this c y of �rc X0511 C) 14 Attest: •- Berk] +Insurance Company .Y � y (Seal) By By�� F- Ir Lederman l Je after oExecutive Vice President&Secretary Se i Ile resident o THIS HIS POW.I?R UN VALID IF NOT PRINTED ON BLUE"IIL'I2ICLEY"SECURITY PAPER. o STATE OF CONNECTICUT) E COUNTY OF FA.IRFJBLD ) � o .N o Sworn to before rte, a Notary Public in the State of Connecticut, this Q51?y of sic c;Y�11 by bra S. Lederman and .leffrey M. f•tafter who are sworn to me to be the 17•xccutive Vice President,t c Secretaly, and It le Senior Vice .President, 5 � respectively,of Berkley Insurance Company. IAARIAC v N�RAKF a CONNECTICUTJ ' �-' �''. :ZMY CO MISSION EXPIRES -- '--" ----- > APHIL 30,2D24 otaiy Public,Stine of Couaecticut i o CERTIFICATE C7 'CZ I,the undersigned,Assistant Secretary ofBERK E'Y INSURANCE COMPANY,DD NF."RF.BY CEIt:ITFY that the foregoing,is a z fru::,correct and complete copy of the original.Power of Attotniey;that said Power of Attorney has not been revoked or rescinded 4 t incl that the. authority of the .Atlorney-in-Pact set forth therein, who executed the bond or undertaking to which this Po%ver of d � Attorney is attached;is in fiill force and effect as of this date. � 3 y Given under my hand and seal of the Company,this 7 day of,., f Siva O Vincent P.Forte DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CEO i-� REYTCON-01 NROGGE ACORO CERTIFICATE OF LIABILITY INSURANCE FDATE(MM/DD/YYYY) 10/27/2021 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT RL Trailor NAME: American Global LLC PHONE FAX 25700 1-45 North (A/C,No,Ext): (A/C,No): Suite 140 E-MAIL DD SS: rl.trailor@americanglobal.com Spring,TX 77386 INSURERS AFFORDING COVERAGE NAIC# INSURERA:Phoenix Insurance Company 25623 INSURED INSURER B:Charter Oak Fire Insurance Company 25615 Reytec Construction Resources, Inc. INSURER C:Travelers Property Cas. Co. of America 25674 1901 Hollister INSURER D:Texas Mutual Insurance Company 22945 Houston,TX 77080 INSURER E:Endurance American Insurance Company 10641 INSURERF:Ironshore Specialty Insurance Company 25445 COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TYPE OF INSURANCE ADDL SUBR POLICY NUMBER POLICY EFF POLICY EXP LIMITS LTR INSD WVD MM/DD/YYYY MM/DD/YYYY A X COMMERCIAL GENERAL LIABILITY EACH OCCURRENCE $ 1,000'000 CLAIMS-MADE X OCCUR CO-OP952334-PHX 10/16/2021 10/16/2022 DAMAGE TO RENTED 300,000 X X PREMISES Ea occurrence $ MED EXP(Any oneperson) $ 10,000 PERSONAL R ADV INJURY $ 1,000,000 GENT AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $ 2,000,000 POLICY� JECOT PRODUCTS-COMP/OPAGG $ 2,000,000 OTHER: ELECTRONIC DATA $ 1,000,000 B AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT 1,000,000 Ea accident $ X ANY AUTO X X 810-OP807813 10/16/2021 10/16/2022 BODILY INJURY Perperson) $ OWNED SCHEDULED AUTOS ONLY AUTOS BODILY INJURY Per accident $ HIRED NON-OWNED PROPERTY DAMAGE AUTOS ONLY AUTOS ONLY Per accident $ C X UMBRELLA LIAB X OCCUR EACH OCCURRENCE $ 5,000,000 EXCESS LIAB CLAIMS-MADE X X CUP-41R344106 10/16/2021 10/16/2022 AGGREGATE $ 5,000,000 DED RETENTION$ $ D WORKERS COMPENSATION X PER OTH- AND EMPLOYERS'LIABILITY X STATUTE ER 0001295501 10/16/2021 10/16/2022 1,000,000 ANY PROPRIETOR/PARTNER/EXECUTIVE N/A E.L.EACH ACCIDENT $ OFFICER/MEMBER EXCLUDED? (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $ 1,000,000 If yes,describe under 1,000,000 DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ E Excess Liability EXC30012116800 10/16/2021 10/16/2022 Each Claim/Aggregate 5,000,000 F Contractor's Polluti ICELLUW00114509 10/16/2021 10/16/2022 Each Occurrence 6,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,maybe attached if more space is required) Callicoatte Road Improvements—Interstate 37 Access Road to Up River Road Additional Insured and Waiver of Subrogation apply to the General Liability,Auto Liability,Umbrella policies per the attached endorsements.Waiver of Subrogation applies to the Workers Compensation policy per the attached endorsement if permissable by law. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE Cit of Corpus Christi—Contracts and Procurement THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Y p ACCORDANCE WITH THE POLICY PROVISIONS. Department 1201 Leopard St., 1st Floor Corpus Christi,TX 78401 AUTHORIZED REPRESENTATIVE �Gtlt�ilt�1� 9 t ACORD 25(2016/03) ©1988-2015 ACORD CORPORATION. All rights reserved. The ACORD name and logo are registered marks of ACORD DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 TeX,qSMutuar WORKERS' COMPENSATION INSURANCE WORKERS' COMPENSATION AND WC 42 03 04 B EMPLOYERS LIABILITY POLICY Agent copy TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. Schedule 1. () Specific Waiver Name of person or organization (X)Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: ALL TEXAS OPERATIONS 3. Premium: The premium charge for this endorsement shall be 2.00 percent of the premium developed on payroll in connection with work performed for the above person(s) or organization(s) arising out of the operations described. 4. Advance Premium: Included, see Information Page This endorsement changes the policy to which it is attached effective on the inception date of the policy unless a different date is indicated below. (The following"attaching clause"need be completed only when this endorsement is issued subsequent to preparation of the policy.) This endorsement,effective on 10/16/20 at 12:01 a.m.standard time,forms a part of: Policy no. 0001295501 of Texas Mutual Insurance Company effective on 10/16/21 Issued to: REYTEC CONSTRUCTION RESOURCES INC This is not a bill Authorized representative NCCI Carrier Code: 29939 PO Box 12058, Austin, TX 78711-2058 1 of 1 texasmutual.com 1 (800) 859-5995 1 Fax(800) 359-0650 WC 42 03 04 B DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 NAMED INSUED: Reytec Construction Resources, Inc. POLICY NUMBER: CO-OP952334-PHX COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET ADDITIONAL INSURED - AUTOMATIC STATUS IF REQUIRED BY WRITTEN CONTRACT (CONTRACTORS) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART The following is added to SECTION II —WHO IS AN (a) The Additional Insured — Owners, Les- INSURED: sees or Contractors — Scheduled Person Any person or organization that: or Organization endorsement CG 20 10 a. You agree in a written contract or agreement to 07 04 or CG 20 10 04 13, the Additional include as an additional insured on this Coverage Insured — Owners, Lessees or Contrac- Part; and tors — Completed Operations endorse- ment CG 20 37 07 04 or CG 20 3 7 04 13, b. Has not been added as an additional insured for or both of such endorsements with either the same project by attachment of an endorse- of those edition dates; or ment under this Coverage Part which includes such person or organization in the endorsement's (b) Either or both of the following: the Addi- schedule; tional Insured —Owners, Lessees or Con- tractors — Scheduled Person Or Organi- is an insured, but: zation endorsement CG 20 10, or the Ad- a. Only with respect to liability for "bodily injury" or ditional Insured — Owners, Lessees or "property damage" that occurs, or for "personal Contractors — Completed Operations en- injury" caused by an offense that is committed, dorsement CG 20 37, without an edition subsequent to the signing of that contract or date of such endorsement specified; agreement and while that part of the contract or the person or organization is an additional in- agreement is in effect; and sured only if the injury or damage is caused, b. Only as described in Paragraph (1), (2) or (3) be- in whole or in part, by acts or omissions of low, whichever applies: you or your subcontractor in the performance (1) If the written contract or agreement specifical- of "your work" to which the written contract or ly requires you to provide additional insured agreement applies; or coverage to that person or organization by (3) If neither Paragraph (1) nor(2) above applies: the use of: (a) The person or organization is an addi- (a) The Additional Insured — Owners, Les- tional insured only if, and to the extent sees or Contractors — (Form B) endorse- that, the injury or damage is caused by ment CG 20 10 11 85; or acts or omissions of you or your subcon- (b) Either or both of the following: the Addi- tractor in the performance of "your work" tional Insured —Owners, Lessees or Con- to which the written contract or agree- tractors — Scheduled Person Or Organi- ment applies; and zation endorsement CG 20 10 10 01, or (b) Such person or organization does not the Additional Insured —Owners, Lessees qualify as an additional insured with re- or Contractors — Completed Operations spect to the independent acts or omis- endorsement CG 20 37 10 01; sions of such person or organization. the person or organization is an additional in- The insurance provided to such additional insured is sured only if the injury or damage arises out subject to the following provisions: of"your work" to which the written contract or a. If the Limits of Insurance of this Coverage Part agreement applies; shown in the Declarations exceed the minimum (2) If the written contract or agreement specifical- limits required by the written contract or agree- ly requires you to provide additional insured ment, the insurance provided to the additional in- coverage to that person or organization by sured will be limited to such minimum required the use of: limits. For the purposes of determining whether CG D6 04 02 19 ©2017 The Travelers Indemnity Company. All rights reserved. Page 1 of 2 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 COMMERCIAL GENERAL LIABILITY this limitation applies, the minimum limits required result in a claim. To the extent possible, such by the written contract or agreement will be con- notice should include: sidered to include the minimum limits of any Um- (a) How, when and where the "occurrence" brella or Excess liability coverage required for the or offense took place; additional insured by that written contract or (b) The names and addresses of any injured agreement. This provision will not increase the persons and witnesses; and limits of insurance described in Section III — Limits Of Insurance. (c) The nature and location of any injury or b. The insurance provided to such additional insured damage arising out of the "occurrence" or does not apply to: offense. (1) Any "bodily injury", "property damage" or (2) If a claim is made or "suit" is brought against "personal injury" arising out of the providing, the additional insured: or failure to provide, any professional archi- (a) Immediately record the specifics of the tectural, engineering or surveying services, claim or"suit" and the date received; and including: (b) Notify us as soon as practicable and see (a) The preparing, approving, or failing to to it that we receive written notice of the prepare or approve, maps, shop draw- claim or"suit" as soon as practicable. ings, opinions, reports, surveys, field or- (3) Immediately send us copies of all legal pa- ders or change orders, or the preparing, pers received in connection with the claim or approving, or failing to prepare or ap- "suit", cooperate with us in the investigation prove, drawings and specifications; and or settlement of the claim or defense against (b) Supervisory, inspection, architectural or the "suit", and otherwise comply with all policy engineering activities. conditions. (2) Any "bodily injury" or "property damage" (4) Tender the defense and indemnity of any caused by "your work" and included in the claim or "suit" to any provider of other insur- "products-completed operations hazard" un- ance which would cover such additional fin- less the written contract or agreement specifi- sured for a loss we cover. However, this con- cally requires you to provide such coverage dition does not affect whether the insurance for that additional insured during the policy provided to such additional insured is primary period. to other insurance available to such additional c. The additional insured must comply with the fol- insured which covers that person or organiza- lowing duties: tion as a named insured as described in Par- (1) Give us written notice as soon as practicable agraph 4., Other Insurance, of Section IV — of an "occurrence" or an offense which may Commercial General Liability Conditions. Page 2 of 2 ©2017 The Travelers Indemnity Company. All rights reserved. CG D6 04 02 19 DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 NAMED INSURED: Reytec Construction Resources, Inc. POLICY NUMBER: CO-OP952334-PHX COMMERCIAL GENERAL LIABILITY THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. XTEND ENDORSEMENT FOR CONTRACTORS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART GENERAL DESCRIPTION OF COVERAGE — This endorsement broadens coverage. However, coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to this Coverage Part, and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The following listing is a general coverage description only. Read all the provisions of this endorsement and the rest of your policy carefully to determine rights, duties, and what is and is not covered. A. Who Is An Insured —Unnamed Subsidiaries C. Incidental Medical Malpractice B. Blanket Additional Insured — Governmental D. Blanket Waiver Of Subrogation Entities — Permits Or Authorizations Relating To E. Contractual Liability—Railroads Operations F. Damage To Premises Rented To You PROVISIONS a. An organization other than a partnership, joint A. WHO IS AN INSURED — UNNAMED venture or limited liability company; or SUBSIDIARIES b. A trust; The following is added to SECTION II —WHO IS as indicated in its name or the documents that AN INSURED: govern its structure. Any of your subsidiaries, other than a partnership, B. BLANKET ADDITIONAL INSURED — joint venture or limited liability company, that is GOVERNMENTAL ENTITIES — PERMITS OR not shown as a Named Insured in the AUTHORIZATIONS RELATING TO OPERATIONS Declarations is a Named Insured if: a. You are the sole owner of, or maintain an The following is added to SECTION II — WHO IS ownership interest of more than 50% in, such AN INSURED: subsidiary on the first day of the policy period; Any governmental entity that has issued a permit and or authorization with respect to operations b. Such subsidiary is not an insured under performed by you or on your behalf and that you similar other insurance. are required by any ordinance, law, building code or written contract or agreement to include as an No such subsidiary is an insured for"bodily injury" additional insured on this Coverage Part is an or "property damage" that occurred, or "personal insured, but only with respect to liabi lity for "bodily and advertising injury" caused by an offense injury", "property damage" or "personal and committed: advertising injury" arising out of such operations. a. Before you maintained an ownership interest The insurance provided to such governmental of more than 50% in such subsidiary; or entity does not apply to: b. After the date, if any, during the policy period a. Any "bodily injury", "property damage" or that you no longer maintain an ownership "personal and advertising injury" arising out of interest of more than 50% in such subsidiary. operations performed for the governmental For purposes of Paragraph 1. of Section II —Who entity; or Is An Insured, each such subsidiary will be b. Any "bodily injury" or "property damage" deemed to be designated in the Declarations as: included in the 11 deemed operations hazard". CG D3 16 02 19 ©2017 The Travelers Indemnity Company.All rights reserved. Page 1 of 3 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. 000uSignEnvelope ID:oEoo7o10-0oon-4EEn-800a-5A7o17AoocEo COMMERCIAL GENERAL LIABILITY C. INCIDENTAL MEDICAL MALPRACTICE pharmaceuticals committed by, or with the 1. The following replaces Paragraph b. of the knowledge orconsent of,the insured. definition of "occurrence" in the S. The following is added tothe DEFINITIONS DEFINITIONS Section: Section: b. An act oromission committed in providing "Incidental medical services" means: or failing to provide "incidental medical services", first aid or "Good Samaritan a. yWedica|. surgical, dental, laboratory, x-ray services" 0o a person, unless you are in or nursing service or treatment, advice or the business or occupation of providing instrucdVn, or the related furnishing of professional health care services. food Vrbeverages; or 2^ The following replaces the last paragraph of b. The furnishing or dispensing of drugs or Paragraph 2.a,(1) of SECTION UU — WHO IS medica|, denta|, or surgical supplies or AN8NSURE0|: appliances. Unless you are inthe business or occupation 6. The following is added to Paragraph 4.b.' of providing professional health care services, Excess Insurance, of SECTION 8V — Paragraphs (1)(a)' (b). (c) and (d) above do COMMERCIAL GENERAL LIABILITY not apply to "bodily injury" arising out of CONDITIONS: providing or failing to provide: This insurance is excess over any valid and (m) "Incidental medical services" by any of collectible other insurance, whether primary, your "employees" who is a nurse, nurse excess, contingent oronany other basis, that assistant emergency medical technician is available to any of your "employees" for or paramedic; or "bodily injury" that arises out of providing or (b) First aid or "Good Samaritan sen/ices" by failing to provide "incidental medical services" any of your "employees" or "volunteer to any person to the extent not subject to workers", other than an employed or Paragraph 3'a'(1) of Section AA — Who Is An volunteer doctor. Any such "employees" Insured. or "volunteer workers" providing or failing D. BLANKET WAIVER OF SUBROGATION to provide first aid or "Good Samaritan services" during their work hours for you The following is added to Paragraph 8., Transfer will be deemed to be acting within the Of Rights Of Recovery Against Others To Um, scope of their employment by you or of SECTION |V — COMMERCIAL GENERAL performing dudes related to the conduct LIABILITY CONDITIONS: ufyour business. If the insured has agreed in a contract or 3' The following replaces the last sentence of agreement to waive that insured's right of Paragraph G. of SECTION UUU — LIMITS OF recovery against any person or organization, we INSURANCE: waive our right ofrecovery against such person or For the purposes of determining the nrganizabnn, but only for payments we make applicable Each Occurrence Limit, all related because of: ads or omissions committed in providing or a' "Bodily injury" or "property damage" that failing to provide "incidental medical occurs; or sen/ces^. first aid or "Good Samaritan services"Urany one person will bedeemed b) b. "Personal and advertising injury" caused by be one "occurrence". anoffense that iscommitted; 4. The following exclusion is added to subsequent to the execution of the contract or Paragraph 2.. Exclusions, of SECTION U — agreement. COVERAGES — COVERAGE A — BODILY E ������TK&ACTU^�L L8^�B8L|T�y—F0k|LROADS AND�� PROPERTY DAMAGE ^ LIABILITY: 1. The following replaces Paragraph c. of the Sale Of Pharmaceuticals definition of "insured contract" in the "Bodily injury' or "property damage" arising Section: sin� ' mut of the violation of a penal statute or c. Any easement orlicense agreement; ordinance relating to the sale of Page 2of3 (D 2o17The Travelers Indemnity Company.All rights reserved. CQ; D3 18 02 19 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. DocuSign Envelope ID:2E8D7l31 D-06D9-4EE9-8D28-5A7317Al36CE0 COMMERCIAL GENERAL LIABILITY 2. Paragraph f.(1) of the definition of "insured a. Any premises while rented to you or contract" in the DEFINITIONS Section is temporarily occupied by you with permission deleted. of the owner; or F. DAMAGE TO PREMISES RENTED TO YOU b. The contents of any premises while such The following replaces the definition of "premises premises is rented to you, if you rent such damage" in the DEFINITIONS Section: premises for a period of seven or fewer "Premises damage" means "property damage"to: consecutive days. CG D3 16 02 19 Q 2017 The Travelers indemnity Company.All rights reserved. Page 3 of 3 Includes copyrighted material of Insurance Services Office, Inc.,with its permission. DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 COMMERCIAL AUTO THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BLANKET ADDITIONAL INSURED - PRIMARY AND NON-CONTRIBUTORY WITH OTHER INSURANCE - CONTRACTORS This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM PROVISIONS 2. The following is added to Paragraph B.S., Other 1. The following is added to Paragraph c. in A.1., Insurance of SECTION IV — BUSINESS AUTO Who Is An Insured, of SECTION II — COVERED CONDITIONS: AUTOS LIABILITY COVERAGE: Regardless of the provisions of paragraph a. and This includes any person or organization who you paragraph d. of this part S. Other Insurance, this are required under a written contract or insurance is primary to and non-contributory with agreement, that is signed by you before the applicable other insurance under which an "bodily injury" or "property damage" occurs and additional insured person or organization is a that is in effect during the policy period, to name named insured when a written contract or as an additional insured for Covered Autos agreement with you, that is signed by you before Liability Coverage, but only for damages to which the "bodily injury" or "property damage" occurs this insurance applies and only to the extent of and that is in effect during the policy period, that person's or organization's liability for the requires this insurance to be primary and non- conduct of another"insured". contributory. CA T4 99 02 16 ©2016 The Travelers Indemnity Company.All rights reserved. Page 1 Of 1 Includes copyrighted material of Insurance Services Office, Inc.with its permission. DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 iNA1 ILIJ IiNJURLIJ:Keytec I.onstruction KeSOAYceS,Inc. POLICY NUMBER:810-OP807813 COMMERCIAL AUTO THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. BUSINESS AUTO EXTENSION ENDORSEMENT This endorsement modifies insurance provided under the following: BUSINESS AUTO COVERAGE FORM GENERAL DESCRIPTION OF COVERAGE — This endorsement broadens coverage. However, coverage for any injury, damage or medical expenses described in any of the provisions of this endorsement may be excluded or limited by another endorsement to the Coverage Part, and these coverage broadening provisions do not apply to the extent that coverage is excluded or limited by such an endorsement. The following listing is a general cover- age description only. Limitations and exclusions may apply to these coverages. Read all the provisions of this en- dorsement and the rest of your policy carefully to determine rights, duties, and what is and is not covered. A. BROAD FORM NAMED INSURED H. HIRED AUTO PHYSICAL DAMAGE — LOSS OF B. BLANKET ADDITIONAL INSURED USE — INCREASED LIMIT C. EMPLOYEE HIRED AUTO I. PHYSICAL DAMAGE — TRANSPORTATION EXPENSES— INCREASED LIMIT D. EMPLOYEES AS INSURED J. PERSONAL PROPERTY E. SUPPLEMENTARY PAYMENTS — INCREASED K. AIRBAGS LIMITS L. NOTICE AND KNOWLEDGE OF ACCIDENT OR F. HIRED AUTO — LIMITED WORLDWIDE COV- LOSS ERAGE— INDEMNITY BASIS M. BLANKET WAIVER OF SUBROGATION G. WAIVER OF DEDUCTIBLE —GLASS N. UNINTENTIONAL ERRORS OR OMISSIONS PROVISIONS A. BROAD FORM NAMED INSURED this insurance applies and only to the extent that The following is added to Paragraph A.1., Who Is person or organization qualifies as an "insured" An Insured, of SECTION II — COVERED AUTOS under the Who Is An Insured provision contained in Section II. LIABILITY COVERAGE: Any organization you newly acquire or form dur- C. EMPLOYEE HIRED AUTO ing the policy period over which you maintain 1. The following is added to Paragraph A.1., 50% or more ownership interest and that is not Who Is An Insured, of SECTION II — COV- separately insured for Business Auto Coverage. ERED AUTOS LIABILITY COVERAGE: Coverage under this provision is afforded only un- An "employee" of yours is an "insured" while til the 180th day after you acquire or form the or- operating an "auto" hired or rented under a ganization or the end of the policy period, which- contract or agreement in an "employee's" ever is earlier. name, with your permission, while performing duties related to the conduct of your busi- B. BLANKET ADDITIONAL INSURED ness. The following is added to Paragraph c. in A.1., 2. The following replaces Paragraph b. in B.S., Who Is An Insured, of SECTION II — COVERED Other Insurance, of SECTION IV — BUSI- AUTOS LIABILITY COVERAGE: NESS AUTO CONDITIONS: Any person or organization who is required under b. For Hired Auto Physical Damage Cover- a written contract or agreement between you and age, the following are deemed to be cov- that person or organization, that is signed and ered "autos"you own: executed by you before the "bodily injury" or (1) Any covered "auto" you lease, hire, "property damage" occurs and that is in effect rent or borrow; and during the policy period, to be named as an addi- (2) Any covered "auto" hired or rented by tional insured is an "insured" for Covered Autos your "employee" under a contract in Liability Coverage, but only for damages to which an "employee's" name, with your CA T3 53 02 15 ©2015 The Travelers Indemnity Company.All rights reserved. Page 1 of 4 Includes copyrighted material of Insurance Services Office, Inc.with its permission. DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 COMMERCIAL AUTO permission, while performing duties (a) With respect to any claim made or "suit" related to the conduct of your busi- brought outside the United States of ness. America, the territories and possessions However, any "auto" that is leased, hired, of the United States of America, Puerto rented or borrowed with a driver is not a Rico and Canada: covered "auto". (i) You must arrange to defend the "in- D. EMPLOYEES AS INSURED sured" against, and investigate or set- tle any such claim or "suit" and keep The following is added to Paragraph A.1., Who Is us us advised of all proceedings and ac- An Insured, of SECTION II — COVERED AUTOS tions. LIABILITY COVERAGE: Any "employee" of yours is an "insured" while us- (ii) Neither you nor any other involved ing a covered "auto" you don't own, hire or borrow "insured" will make any settlement in your business or your personal affairs. without our consent. E. SUPPLEMENTARY PAYMENTS — INCREASED (iii)We may, at our discretion, participate LIMITS in defending the "insured" against, or in the settlement of, any claim or 1. The following replaces Paragraph A.2.a.(2), "suit". of SECTION II — COVERED AUTOS LIABIL- ITY COVERAGE: (iv) We will reimburse the "insured" for sums that the "insured" legally must (2) Up to $3,000 for cost of bail bonds (in- pay as damages because of "bodily cluding bonds for related traffic law viola- injury" or "property damage" to which tions) required because of an "accident" this insurance applies, that the "in- we cover. We do not have to furnish sured" pays with our consent, but these bonds. only up to the limit described in Para- 2. The following replaces Paragraph A.2.a.(4), graph C., Limits Of Insurance, of of SECTION II — COVERED AUTOS LIABIL- SECTION II — COVERED AUTOS ITY COVERAGE: LIABILITY COVERAGE. (4) All reasonable expenses incurred by the (v) We will reimburse the "insured" for "insured" at our request, including actual the reasonable expenses incurred loss of earnings up to $500 a day be- with our consent for your investiga- cause of time off from work. tion of such claims and your defense of the "insured" against any such F. HIRED AUTO — LIMITED WORLDWIDE COV- "suit", but only up to and included ERAGE— INDEMNITY BASIS within the limit described in Para- The following replaces Subparagraph (5) in Para- graph C., Limits Of Insurance, of graph B.7., Policy Period, Coverage Territory, SECTION II — COVERED AUTOS of SECTION IV — BUSINESS AUTO CONDI- LIABILITY COVERAGE, and not in TIONS: addition to such limit. Our duty to (5) Anywhere in the world, except any country or make such payments ends when we have used up the applicable limit of jurisdiction while any trade sanction, em- insurance in payments for damages, bargo, or similar regulation imposed by the settlements or defense expenses. United States of America applies to and pro- hibits the transaction of business with or (b) This insurance is excess over any valid within such country or jurisdiction, for Cov- and collectible other insurance available ered Autos Liability Coverage for any covered to the "insured" whether primary, excess, "auto" that you lease, hire, rent or borrow contingent or on any other basis. without a driver for a period of 30 days or less (c) This insurance is not a substitute for re- and that is not an "auto" you lease, hire, rent quired or compulsory insurance in any or borrow from any of your "employees", country outside the United States, its ter- partners (if you are a partnership), members ritories and possessions, Puerto Rico and (if you are a limited liability company) or Canada. members of their households. Page 2 of 4 ©2015 The Travelers Indemnity Company.All rights reserved. CA T3 53 02 15 Includes copyrighted material of Insurance Services Office, Inc.with its permission. DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 COMMERCIAL AUTO You agree to maintain all required or (2) In or on your covered "auto". compulsory insurance in any such coun- This coverage applies only in the event of a total try up to the minimum limits required by theft of your covered "auto". local law. Your failure to comply with compulsory insurance requirements will No deductibles apply to this Personal Property not invalidate the coverage afforded by coverage. this policy, but we will only be liable to the K. AIRBAGS same extent we would have been liable The following is added to Paragraph B.3., Exclu- had you complied with the compulsory in- sions, of SECTION III — PHYSICAL DAMAGE surance requirements. COVERAGE: (d) It is understood that we are not an admit- Exclusion 3.a. does not apply to "loss" to one or ted or authorized insurer outside the more airbags in a covered "auto" you own that in- United States of America, its territories flate due to a cause other than a cause of "loss" and possessions, Puerto Rico and Can- set forth in Paragraphs A.1.b. and A.1.c., but ada. We assume no responsibility for the only: furnishing of certificates of insurance, or a. If that "auto" is a covered "auto" for Compre- for compliance in any way with the laws hensive Coverage under this policy; of other countries relating to insurance. b. The airbags are not covered under any war- G. WAIVER OF DEDUCTIBLE —GLASS ranty; and The following is added to Paragraph D., Deducti- c. The airbags were not intentionally inflated. ble, of SECTION III — PHYSICAL DAMAGE We will pay up to a maximum of $1,000 for any COVERAGE: one "loss". No deductible for a covered "auto" will apply to L. NOTICE AND KNOWLEDGE OF ACCIDENT OR glass damage if the glass is repaired rather than LOSS replaced. The following is added to Paragraph A.2.a., of H. HIRED AUTO PHYSICAL DAMAGE — LOSS OF SECTION IV— BUSINESS AUTO CONDITIONS: USE—INCREASED LIMIT Your duty to give us or our authorized representa- The following replaces the last sentence of Para- tive prompt notice of the "accident" or "loss" ap- graph A.4.b., Loss Of Use Expenses, of SEC- plies only when the "accident" or "loss" is known TION III —PHYSICAL DAMAGE COVERAGE: to: However, the most we will pay for any expenses (a) You (if you are an individual); for loss of use is $65 per day, to a maximum of (b) A partner (if you are a partnership); $750 for any one "accident". (c) A member (if you are a limited liability com- I. PHYSICAL DAMAGE — TRANSPORTATION pany); EXPENSES— INCREASED LIMIT (d) An executive officer, director or insurance The following replaces the first sentence in Para- manager (if you are a corporation or other or- graph A.4.a., Transportation Expenses, of ganization); or SECTION III — PHYSICAL DAMAGE COVER- (e) Any "employee" authorized by you to give no- AGE: tice of the "accident" or"loss". We will pay up to $50 per day to a maximum of M. BLANKET WAIVER OF SUBROGATION $1,500 for temporary transportation expense in- The following replaces Paragraph A.S., Transfer curred by you because of the total theft of a cov- Of Rights Of Recovery Against Others To Us, ered "auto" of the private passenger type. of SECTION IV — BUSINESS AUTO CONDI- J. PERSONAL PROPERTY TIONS : The following is added to Paragraph A.4., Cover- S. Transfer Of Rights Of Recovery Against age Extensions, of SECTION III — PHYSICAL Others To Us DAMAGE COVERAGE: We waive any right of recovery we may have Personal Property against any person or organization to the ex- tent required of you by a written contract We will pay up to $400 for "loss" to wearing ap- signed and executed prior to any "accident" parel and other personal property which is: or "loss", provided that the "accident" or "loss" (1) Owned by an "insured"; and arises out of operations contemplated by CA T3 53 02 15 ©2015 The Travelers Indemnity Company.All rights reserved. Page 3 of 4 Includes copyrighted material of Insurance Services Office, Inc.with its permission. DocuSign Envelope ID:2E8D7B1 D-06D9-4EE9-8D28-5A7317AB6CE0 COMMERCIAL AUTO such contract. The waiver applies only to the The unintentional omission of, or unintentional person or organization designated in such error in, any information given by you shall not contract. prejudice your rights under this insurance. How- N. UNINTENTIONAL ERRORS OR OMISSIONS ever this provision does not affect our right to col- The following is added to Paragraph B.2., Con- lect additional premium or exercise our right of cealment, Misrepresentation, Or Fraud, of cancellation or non-renewal. SECTION IV—BUSINESS AUTO CONDITIONS: Page 4 of 4 ©2015 The Travelers Indemnity Compa ny.All rights reserved . CA T3 53 02 15 Includes copyrighted material of Insurance Services Office, Inc.with its permission. \\ NOTICE OF AWARD PROCUREMENT Contractor: Reytec Construction Resources, Inc. Project: Callicoatte Road (Up River to IH-37) Project No. 18010A PO Box 9277 Corpus Christi This notice serves as confirmation of award of the referenced Project, to your firm, by the Corpus Texas, 78469-9277 Christi City Council on October 19, 2021 in the amount of$1,927,197.50. Contractor is instructed Phone: to execute all necessary forms and submit all required documentation as outlined in solicitation. 361.826.3160 All required Form 1295, insurance and bond submittals are due back to this office within 10 calendar days of receipt. The following document submittals are required to prepare the contract: Form 1295 Certificate of Interested Parties Performance and Payment Bond — Required bond forms have been provided to you for execution. Submit one set of original hard copy performance and payment bonds. Insurance — Refer to the contract documents, Section 00 73 00, for insurance requirements and submit proof of coverage. Submittals will include a Certificate of Insurance referencing the project name and number and all applicable endorsements to the policies. Please contact Lois Hinojosa, Construction Contracts Administrator, if you have any questions regarding this information. (A�/- � 61--"l /0 Z o 21 Joshronley Date Assist nt Director 0 Procurement RETURN DOCUMENTS TO: Lois Hinojosa—Construction Contracts Administrator City of Corpus Christi—Contracts and Procurement 1201 Leopard St. - City Hall, First Floor Corpus Christi, TX 78469-9277