HomeMy WebLinkAboutC2023-064 - 4/25/2023 - Approved DocuSign Envelope ID:A43689B7-42A7-49CE-ADOA-330467219EE1
May 9, 2023
SCS Engineering, Inc.
FINANCE- Ryan Kuntz, P.E.
PROCUREMENT Vice President
PO Box 9277 1901 Central Drive, Ste. 550
Corpus Christi Bedford, Texas 76021
Texas, 78469-9277 (817) 571-2288
Phone: rkuntz@scsenQineers,com
361.826.3160
Subject: Amendment No. 1 to the Contract for Professional Services
Cefe Valenzuela Gas Collection System 3C
(Project No. 23118)
(Service Agreement No. 4252)
Notice to Proceed
Dear Mr. Kuntz,
Enclosed is the executed Amendment No. 1, which was approved by City
Council on April 25, 2023 through Motion Number M2023-060, for providing
Professional Services for the subject project, for an additional amount not to
exceed $125,791 .00, for a total revised amount not to exceed $154,291 .00.
You are now authorized to proceed with the contract.
Sincerely,
DacuSigned by:
FIDS S 56E'64 G...
Josh ron ey
Assistant Director of Finance-Procurement
JC: jw
Encl.
cc: J.H. Edmonds, P.E., Director of Engineering Services
DocuSign Envelope ID:A43689B7-42A7-49CE-ADOA-330467219EE1
Service Agreement No. 4252
CITY OF CORPUS CHRISTI
AMENDMENT NO. 1 to the
CONTRACT FOR PROFESSIONAL SERVICES
The City of Corpus Christi, Texas, hereinafter called "CITY," and SCS Engineering Inc., hereinafter
called "CONSULTANT," agree to the following amendment to the Contract for Professional Services for
the Cefe Valenzuela Gas Collection System 3C — Project No. 23118, as authorized and amended
by:
Original Contract July 21, 2022 Administrative Approval $28,500.00
IN THE ORIGINAL CONTRACT, EXHIBIT A, SCOPE OF SERVICES, shall be modified as shown in
the attached Exhibit A.
IN THE ORIGINAL CONTRACT, COMPENSATION shall be modified as shown in the attached Exhibit
A for an additional fee not to exceed $125,791.00 for a total revised fee not to exceed $154,291.00.
All other terms and conditions of the July 21, 2022 contract between the "CITY' and "CONSULTANT"
and of any amendments to that contract which are not specifically addressed herein shall remain in full
force and effect.
CITY OF CORPUS CHRISTI SCS ENGINEERING, INC.
DacuSigned by: —Docu Signed by;
5/3/2023 � 3/7/2023
•gB&QFF96€"�&2._. FQ2RnaoFnn �
Jeffery Edmonds, P.E. Date Ryan Kuntz, P.E. Date
Vice President
1901 Central Drive, Ste. 550
Bedford, Texas 76021
Phone: 817-571-2288
Email: rkuntz@scsengineers.com
APPROVED AS TO LEGAL FORM:
Docusigned by:
D � A,4 5/2/2023
es��e-F�saaa�.._
Assistant City Attorney Date M2023-060
Authorized By
4/25/2023
Council
ATTEST
DacuSigned by:
t LCA h�A. 5/9/2023 ErDS/s is
City Secretary Date
DocuSign Envelope ID:A43689B7-42A7-49CE-ADOA-330467219EE1
130913EM13MEnvironmental Consultants & Contractors
January 30, 2023
SCS Project No. 160061222
Mr. Natnaiel Woldesenbet (sent via email)
Engineer I
City of Corpus Christi
1201 Leopard Street
Corpus Christi TX 78401
Subject: Contract Amendment Request for Project No. 23118 - Cefe Valenzuela Gas
Collection System 3C
Cell 3C Gas Collection and Control System (GCCS) Expansion
Construction Quality Assurance Services (CQA)Services
Cefe Valenzuela Landfill, Corpus Christi,Texas
Dear Natnaiel:
Consistent with discussions and the request of the City of Corpus Christi, SCS Engineers is requesting
a contract amendment to Project No. 23118, related to Cefe Valenzuela Gas Collection System 3C.
Specifically, this contract amendment is related to the CQA services required during the GCCS
expansion into Cell 3C at the Cefe Valenzuela Landfill (landfill).
As you knowfrom our initial contract,federal New Source Performance Standards(NSPS)for Municipal
Solid Waste Landfills,which are contained in NSPS 40 CFR 62,Subpart 000 (EPA Emissions Guideline
Plan) and NESHAPS 40 CFR 63, Subpart AAAA require that a GCCS control landfill gas from waste at
the landfill that has been in place 5 years or more if at intermediate grade, or 2 years or more at final
permitted grade. Therefore, a GCCS expansion into Cell 3C must be constructed and operated by
October 9, 2023 based on that cell's first waste disposal being on or after October 9, 2018.
SCS has extensive experience with NSPS requirements and GCCS design. SCS provided the GCCS
design and construction quality control/assurance (CQA)for the initial GCCS and expansion into Cells
1B/1C at the landfill, as well as prepared the construction plans and specifications for the proposed
GCCS expansion into Cell 3C. CQA services for this type of construction requires specialty field CQA
and construction-phase engineering oversight services, which SCS has performed at this landfill and
numerous landfill across the United States. Our project team has also provided the City with the
landfill's air permitting and compliance needs prior to the landfill commencing operation in 2007.
Resumes are available upon request as well as detailed qualifications, if necessary.
Our CQA services for the Cell 3C GCCS expansion are described in detail below, but generally include
review of Contractor submittals, requests-for-information, and installed quantities; observation and
documentation of drilling and installation of LFG extraction wells and observation, documentations,
and surveying during the installation of LFG collection piping, and condensate management
components; and preparation of a construction documentation report.
Based on our current estimates of the magnitude and size of the GCCS expansion (i.e., header/lateral
lengths, number and depth of extraction wells) and based on our experience of designing and
performing CQAfor a similartype and size of system, construction of the GCCS expansion maytake up
to 80 calendar days. As such, we have based our fee estimate for CQA services on a construction
"`b
12651 ;I . 244, L.k)usI(�)I), IX 77494 1281...293 8494 281...293 7878
uAinid No I
I iaqo I of 5
DocuSign Envelope ID:A43689B7-42A7-49CE-ADOA-330467219EE1
Mr. Natnaiel Woldesenbet
January 30, 2023
Page 2
duration of 80 calendar days (11.5 weeks) performed over up to twelve (12) hours per day, Monday
through Saturday(working day), consistent with the RFB for construction. This construction duration
will result in an estimated 69 working days for the CQA technician.
Our CQA services have been separated into the following tasks:
• Task 1 - Pre-Construction Survey;
• Task 2 - Field CQA Services;
• Task 3 - Construction-Phase Engineering Services;
• Task 4 - Construction Documentation Report.
Our CQA team will be supervised by a professional engineer licensed in the State of Texas (Certifying
Engineer) with experience in designing and performing CQA services for similar systems of size and
scope. This Certifying Engineer will certify upon completion of construction that the GCCS expansion
has been installed in accordance with the Bid Documents and nationally recognized industry
standards.
Task 1 — Pre-Construction Survey
This task includes the required pre-construction survey of the proposed LFG extraction well locations.
The surveyor used for this effort will be a registered professional land surveyor (RPLS) licensed in the
State of Texas, and will be subcontracted and coordinated by SCS.
The pre-construction survey must be performed to confirm ground surface elevations of the 21 LFG
extraction wells prior to commencement of construction. This survey will be performed one (1) week
prior to construction or sooner if necessary to accommodate commencement of the drilling effort. The
surface elevations obtained for the well locations will be used to finalize the well schedule for the
project. This pre-construction survey will be reviewed and approved by the Certifying Engineer who is
a professional engineer licensed in the State of Texas.
Task 2 - Field CQA Services
This task includes field CQA services during the project. During construction, SCS will provide a
qualified CQA Technician to be onsite daily to observe and document construction, and to verify
conformance with the construction plans and specifications.
The CQA technician's responsibilities during drilling and completion of extraction wells will include the
following:
1. Document and observe well construction for conformance to the approved construction plans
and specifications.
2. Document and observe the waste composition,temperature,and decomposition level of waste
removed from the wellbore. This information will be documented on well boring logs.
3. Document and observe that proper well depths, pipe types, backfill, backfill procedures, and
well pipe lengths are consistent with the construction plans and specifications. This
information will be documented on well installation records.
4. SCS' CQA technician will have the capabilityto confirm well locations and elevations using GPS
survey equipment.
uAinid No t
�4�Iiaqo 2 of 5
DocuSign Envelope ID:A43689B7-42A7-49CE-ADOA-330467219EE1
Mr. Natnaiel Woldesenbet
January 30, 2023
Page 3
The CQA technician's responsibilities during the remainder of the project will include the
documentation and observation of the following for conformance with the construction plans and
specifications:
1. Materials, layout and installation of pipe,fittings, and valves associated LFG collection system
and condensate management system, including air supply, condensate forcemain,
condensate sumps, and LFG collection header/lateral piping.
2. Review, observe, and document pneumatic pipe pressure testing.
3. The CQAtechnician will perform record location and elevation surveys of installed pipe,fittings,
and valves and verify proper slopes and depths of piping prior to burial consistent with the
construction plans and specifications. This work will be completed with GPS survey equipment.
The survey equipment and CQA Technician will be capable of inversing slopes in the field to
provide immediate verification of slopes to the Contractor. The survey equipment will be
available for use on-site during all times that construction activities are ongoing.
If field conditions require an adjustment to the well locations, piping or other materials, the Certifying
Engineer will confirm what adjustments are needed, and coordinate accordingly with City and CQA
Technician. During construction, the Certifying Engineer or qualified representative will review and
approve collected survey data on a weekly basis. Additionally, during construction the CQA Technician
will prepare daily activity reports documenting conformance with the construction plans and
specifications, which will be incorporated into the construction documentation report(see Task 4).
As described above, our fee estimate for this task assumes a construction schedule of up to 69
working days for construction, performed over 12 hours per day, Monday through Saturday. During
this construction duration, we will have a lead CQA technician onsite for the entire duration. Also, our
fees for this task includes applicable expenses for our CQA technicians, such as
mobilization/demobilization, lodging/per diem, vehicle/mileage, and equipment (survey equipment).
If the Contractor experiences any downtime in excess of three working days, additional mobilization/
demobilization charges may be necessary.
Our fee estimate for this task is based on the following labor hours and expenses.
Description Units Quantity Cost per Unit Total Cost
Mob/Demob3 Per Trip 2 $1,300 $2,600.00
CQA Technician Hour 828 $75.00 $62,100.00
Field Vehicle2 Day 80 $76.00 $6,080.00
Lodging/Per Diem2 Day 80 $185.00 $14,800.00
Survey Equipmentl Month 3 $1,150.00 $3,450.00
Task 2 Subtotal: $89,030.00
1Based on full month rate. Weekly rates will be billed at 1/3 monthly rates or$400/week.
213ased on one CQA Technician onsite during the full 80 calendar day(11.5 week)construction duration.
3Assumes one(1)mobilization/demobilization forthe CQATechnician,if additional mobilization/demobilization are required,
these will be billed at the unit rate in the table.
Task 3 - Construction-Phase Engineering Services
This task includes the supervision, project management, and construction-phase engineering services
by the Design/Certifying Engineer or representative thereof during the entire construction duration.
This individual will make visits to the site to be familiar with the work and to review the gathered
uAinid No t
�4�Iiaqo 3 of 5
DocuSign Envelope ID:A43689B7-42A7-49CE-ADOA-330467219EE1
Mr. Natnaiel Woldesenbet
January 30, 2023
Page 4
documentation of construction. The Design/Certifying Engineer or qualified representative thereof will
perform the construction-phase engineering services, which will include the following services:
• Telephone calls among the City, GCCS Contractor, and/or CQA technician to answer questions
and resolve issues.
• Review and respond to all GCCS Contractor submittals, requests-for-information and
clarifications of construction plans and specifications.
• Preparation of well boring logs and well completion records based on documented installation
of LFG extraction wells.
• Review and evaluate record survey data on a weekly basis.
• Maintain files for correspondence, photographs, requests-for-information or clarifications,and
other construction project related documentation.
• Project progress meetings on a bi-weekly basis by conference call with City, Contractor, and
CQA technician.
Our fee estimate for this task assumes that up to 6 hours/week for the Design/Certifying Engineer or
qualified representative thereof will be sufficient over the assumed project duration (11.5 weeks) to
complete the construction-phase engineering services. In addition to the above construction-phase
engineering services, the design/Certifying Engineer or qualified representative will attend up to four
(4) onsite inspections/meetings during the project, including a pre-construction meeting, three (3)
intermediate meetings/inspections; and a final inspection/walkthrough at substantial completion.
Lastly, our fee estimate for this task includes laboratory testing services for the well aggregate.
Our fee estimate for this task is based on the following labor hours and expenses:
Description Units Quantity Cost per Unit Total Cost
Satellite Office Manager Hours 8 $230.00 $1,840.00
Project Manager12 Hours 60 $175.00 $10,500.00
Project Professionall-2 Hours 36 $140.00 $5,040.00
Associate Staff Professionall Hours 24 $120.00 $2,880.00
Data Analystl Hour 24 $74.00 $1,776.00
Office Service Manager Hours 5 $115.00 $ 575.00
CE Travel Expenses Per Trip 5 $1,200.00 $6,000.00
Material Testing Each 1 $400.00 $ 400.00
Task 3 Subtotal: $29,011.00
1. SCS has assumed up to six(6)hours per week combined for construction oversight by the Project Manager,Project
Professional,Associate Staff Professional,and Data Analyst over the construction duration.
2. Site visits include up to 12 hours per visit.
Task 4 - Construction Documentation Report
This task will include the preparation of a construction documentation report. This report will include
record drawings and surveys; including surveying of extraction wells, piping at 50-foot intervals or less
for pipe inflections, fittings, and valves, and other infrastructure installed during the course of the
project. The construction report will include a project overview, record survey, results of field testing,
LFG extraction well boring logs and installation records, daily reports, and photographs taken during
construction. The narrative portion of the report will list project participants, construction milestone
uAinid N t
P"' 4 'f5
DocuSign Envelope ID:A43689B7-42A7-49CE-ADOA-330467219EE1
Mr. Natnaiel Woldesenbet
January 30, 2023
Page 5
dates, and provide a description of issues encountered during construction or areas that may warrant
attention in the future.
A draft (electronic PDF format) of the construction report will be provided to the City within four (4)
weeks of field work completion for review. Up to three (3)final hard copies for the site's records will
be submitted within two (2) weeks after receiving comments. The final report will have any edits per
comments from the City addressed, and will be sealed by a professional engineer licensed in the State
of Texas.
FEE ESTIMATE
Our fees and fee basis for performing this work are tabulated in the following table. Well-defined
services will be performed on a lump sum basis (Tasks 1 and 4). Time and material tasks will be
performed will be invoiced consistent with our attached fee schedule (Tasks 2 and 3).
TASK NO. TASK DESCRIPTION FEE FEE BASIS
1 Pre-Construction Survey $1,750 Lump Sum
2 Field CQA Services $89,030 T&M
3 Construction-Phase Engineering Services $29,011 T&M
4 Construction Record Report $6,000 Lump Sum
TOTAL: $125,791
CLOSING
If you have any questions, comments,or require any additional information, please feel free to contact
Ryan Kuntz at (817) 676-7720 or Brett DeVries, Ph.D., P.E. at(817) 358-6110.
Sincerely,
Brett DeVries, Ph.D., P.E. Ryan Kuntz, P.E.
Project Manager Vice President/Satellite Office Manager
SCS Engineers SCS Engineers
Attachment
Cc: Philip Aldridge, City of Corpus Christi (e-copy)
uAinid No t
�4�Iiaqo 5 of 5