SERVICE AGREEMENT NO. 4995
Preventative Maintenance and Reconditioning of Pumps and
f�'anwo�alev
1852 Motors
THIS Preventative Maintenance and Reconditioning of Pumps and Motors
Agreement ("Agreement") is entered into by and between the City of Corpus Christi, a
Texas home-rule municipal corporation ("City") and Excel Pump & Machine, Inc.
("Contractor'), effective upon execution by the City Manager or the City Manager's
designee ("City Manager").
WHEREAS, Contractor has bid to provide Preventative Maintenance and
Reconditioning of Pumps and Motors in response to Request for Bid/Proposal No. 4995
("RFB/RFP"), which RFB/RFP includes the required scope of work and all specifications
and which RFB/RFP and the Contractor's bid or proposal response, as applicable, are
incorporated by reference in this Agreement as Exhibits 1 and 2, respectively, as if each
were fully set out here in its entirety.
NOW, THEREFORE, City and Contractor agree as follows:
1. Scope. Contractor shall provide Preventative Maintenance and Reconditioning
of Pumps and Motors ("Services") in accordance with the attached Scope of
Work, as shown in Attachment A, the content of which is incorporated by
reference into this Agreement as if fully set out here in its entirety, and in
accordance with Exhibit 2.
2. Term.
(A) The Term of this Agreement is three years beginning on the date provided in
the Notice to Proceed from the Contract Administrator or the City's Procurement
Division. The parties may mutually extend the term of this Agreement for up to two
additional one-year periods ("Option Period(s)"), provided, the parties do so in
writing prior to the expiration of the original term or the then-current Option Period.
(B) At the end of the Term of this Agreement or the final Option Period, the
Agreement may, at the request of the City prior to expiration of the Term or final
Option Period, continue on a month-to-month basis for up to six months with
compensation set based on the amount listed in Attachment B for the Term or the
final Option Period. The Contractor may opt out of this continuing term by
providing notice to the City at least 30 days prior to the expiration of the Term or
final Option Period. During the month-to-month term, either Party may terminate
the Agreement upon 30 days' written notice to the other Party.
Service Agreement-Mary Rhodes Pipeline Phase 11 (PM & Reconditioning) Page 1 of 8
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
3. Compensation and Payment. This Agreement is for an amount not to exceed
$861,330.00, subject to approved extensions and changes. Payment will be made
for Services performed and accepted by the City within 30 days of acceptance,
subject to receipt of an acceptable invoice. All pricing must be in accordance
with the attached Bid/Pricing Schedule, as shown in Attachment B, the content
of which is incorporated by reference into this Agreement as if fully set out here in
its entirety. Any amount not expended during the initial term or any option period
may, at the City's discretion, be allocated for use in the next Option Period.
Invoices must be mailed to the following address with a copy provided to the
Contract Administrator:
City of Corpus Christi
Attn: Accounts Payable
P.O. Box 9277
Corpus Christi, Texas 78469-9277
4. Contract Administrator. The Contract Administrator designated by the City is
responsible for approval of all phases of performance and operations under this
Agreement, including deductions for non-performance and authorizations for
payment. The City's Contract Administrator for this Agreement is as follows:
Name: Diana Zertuche-Garza
Department: Corpus Christi Water
Phone: (361) 826-1827
Email: Dianaz@cctexas.com
5. Insurance; Bonds.
(A) Before performance can begin under this Agreement, the Contractor must
deliver a certificate of insurance ("COI"), as proof of the required insurance
coverages, to the City's Risk Manager and the Contract Administrator.
Additionally, the COI must state that the City will be given at least 30 days'
advance written notice of cancellation, material change in coverage, or intent
not to renew any of the policies. The City must be named as an additional insured.
The City Attorney must be given copies of all insurance policies within 10 days of
the City Manager's written request. Insurance requirements are as stated in
Attachment C, the content of which is incorporated by reference into this
Agreement as if fully set out here in its entirety.
(B) In the event that a payment bond, a performance bond, or both, are
required of the Contractor to be provided to the City under this Agreement before
performance can commence, the terms, conditions, and amounts required in the
bonds and appropriate surety information are as included in the RFB/RFP or as
may be added to Attachment C, and such content is incorporated here in this
Service Agreement-Mary Rhodes Pipeline Phase 11 (PM & Reconditioning) Page 2 of 8
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
Agreement by reference as if each bond's terms, conditions, and amounts were
fully set out here in its entirety.
6. Purchase Release Order. For multiple-release purchases of Services to be
provided by the Contractor over a period of time, the City will exercise its right to
specify time, place and quantity of Services to be delivered in the following
manner: any City department or division may send to Contractor a purchase
release order signed by an authorized agent of the department or division. The
purchase release order must refer to this Agreement, and Services will not be
rendered until the Contractor receives the signed purchase release order.
7. Inspection and Acceptance. City may inspect all Services and products supplied
before acceptance. Any Services or products that are provided but not
accepted by the City must be corrected or re-worked immediately at no charge
to the City. If immediate correction or re-working at no charge cannot be made
by the Contractor, a replacement service may be procured by the City on the
open market and any costs incurred, including additional costs over the item's
bid/proposal price, must be paid by the Contractor within 30 days of receipt of
City's invoice.
8. Warranty.
(A) The Contractor warrants that all products supplied under this Agreement are
new, quality items that are free from defects, fit for their intended purpose, and of
good material and workmanship. The Contractor warrants that it has clear title to
the products and that the products are free of liens or encumbrances.
(B) In addition, the products purchased under this Agreement shall be warranted
by the Contractor or, if indicated in Attachment D by the manufacturer, for the
period stated in Attachment D. Attachment D is attached to this Agreement and
is incorporated by reference into this Agreement as if fully set out here in its
entirety.
(C) Contractor warrants that all Services will be performed in accordance with
the standard of care used by similarly situated contractors performing similar
services.
9. Quality/Quantity Adjustments. Any Service quantities indicated on the Bid/Pricing
Schedule are estimates only and do not obligate the City to order or accept more
than the City's actual requirements nor do the estimates restrict the City from
ordering less than its actual needs during the term of the Agreement and including
any Option Period. Substitutions and deviations from the City's product
requirements or specifications are prohibited without the prior written approval of
the Contract Administrator.
Service Agreement-Mary Rhodes Pipeline Phase 11 (PM & Reconditioning) Page 3 of 8
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
10. Non-Appropriation. The continuation of this Agreement after the close of any
fiscal year of the City,which fiscal year ends on September 30th annually, is subject
to appropriations and budget approval specifically covering this Agreement as
an expenditure in said budget, and it is within the sole discretion of the City's City
Council to determine whether or not to fund this Agreement. The City does not
represent that this budget item will be adopted, as said determination is within the
City Council's sole discretion when adopting each budget.
11. Independent Contractor. Contractor will perform the work required by this
Agreement as an independent contractor and will furnish such Services in its own
manner and method, and under no circumstances or conditions will any agent,
servant or employee of the Contractor be considered an employee of the City.
12. Subcontractors. In performing the Services, the Contractor may use
subcontractors in connection with the work performed under this Agreement.
When using subcontractors, however, the Contractor must obtain prior written
approval from the Contract Administrator unless the subcontractors were named
in the bid or proposal or in an Attachment to this Agreement, as applicable. In
using subcontractors, the Contractor is responsible for all their acts and omissions
to the same extent as if the subcontractor and its employees were employees of
the Contractor. All requirements set forth as part of this Agreement, including the
necessity of providing a COI in advance to the City, are applicable to all
subcontractors and their employees to the same extent as if the Contractor and
its employees had performed the work. The City may, at the City's sole discretion,
choose not to accept Services performed by a subcontractor that was not
approved in accordance with this paragraph.
13. Amendments. This Agreement may be amended or modified only in writing
executed by authorized representatives of both parties.
14. Waiver. No waiver by either party of any breach of any term or condition of this
Agreement waives any subsequent breach of the same.
15. Taxes. The Contractor covenants to pay payroll taxes, Medicare taxes, FICA
taxes, unemployment taxes and all other applicable taxes. Upon request, the City
Manager shall be provided proof of payment of these taxes within 15 days of such
request.
16. Notice. Any notice required under this Agreement must be given by fax, hand
delivery, or certified mail, postage prepaid, and is deemed received on the day
faxed or hand-delivered or on the third day after postmark if sent by certified mail.
Notice must be sent as follows:
IF TO CITY:
City of Corpus Christi
Attn: Diana Zeruche-Garza
Service Agreement-Mary Rhodes Pipeline Phase 11 (PM & Reconditioning) Page 4 of 8
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
Title: Contracts/Fund Administrators
Address: 13101 Leopard Street, Corpus Christi, Texas 78410
Phone: (361) 826-1827
Fax: (361) 826-4495
IF TO CONTRACTOR:
Excel Pump & Machine, Inc.
Attn: Randall Houghton
Title: President
Address: 1450 E. State Hwy. 44 Robstown, Texas 78380
Phone: (361) 387-4508
Fax:( 361 ) 387-8844
17. Contractor shall fully indemnify, hold harmless, and defend the City of
Corpus Christi and its officers, employees, and agents ("Indemnitees')
from and against any and all liability, loss, claims, demands, suits, and
causes of action of whatever nature, character, or description on
account of personal injuries, property loss, or damage, or any other
kind of injury, loss, or damage, including all expenses of litigation,
court costs, attorneys' fees and expert witness fees, which arise or are
claimed to arise out of or in connection with a breach of this
Agreement or the performance of this Agreement by the Contractor
or results from the negligent act, omission, misconduct, or fault of the
Contractor, its employees, or agents. Contractor must, at its own
expense, investigate all claims and demands, attend to their
settlement or other disposition, defend all actions based thereon with
counsel satisfactory to the City Attorney, and pay all charges of
attorneys and all other costs and expenses of any kind arising or
resulting from any said liability, damage, loss, claims, demands, suits,
or actions. The indemnification obligations of Contractor under this
section shall survive the expiration or earlier termination of this
Agreement.
18. Termination.
(A) The City may terminate this Agreement for Contractor's failure to comply with
any of the terms of this Agreement. The City must give the Contractor written
notice of the breach and set out a reasonable opportunity to cure. If the
Contractor has not cured within the cure period, the City may terminate this
Agreement immediately thereafter.
Service Agreement-Mary Rhodes Pipeline Phase 11 (PM & Reconditioning) Page 5 of 8
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
(B) Alternatively, the City may terminate this Agreement for convenience upon
30 days advance written notice to the Contractor. The City may also terminate
this Agreement upon 24 hours written notice to the Contractor for failure to pay or
provide proof of payment of taxes as set out in this Agreement.
19. Owner's Manual and Preventative Maintenance. Contractor agrees to provide a
copy of the owner's manual and/or preventative maintenance guidelines or
instructions if available for any equipment purchased by the City pursuant to this
Agreement. Contractor must provide such documentation upon delivery of such
equipment and prior to receipt of the final payment by the City.
20. Limitation of Liability. The City's maximum liability under this Agreement is limited
to the total amount of compensation listed in Section 3 of this Agreement. In no
event shall the City be liable for incidental, consequential, or special damages.
21. Assignment. No assignment of this Agreement by the Contractor, or of any right
or interest contained herein, is effective unless the City Manager first gives written
consent to such assignment. The performance of this Agreement by the
Contractor is of the essence of this Agreement, and the City Manager's right to
withhold consent to such assignment is within the sole discretion of the City
Manager on any ground whatsoever.
22. Severability. Each provision of this Agreement is considered to be severable and,
if, for any reason, any provision or part of this Agreement is determined to be
invalid and contrary to applicable law, such invalidity shall not impair the
operation of nor affect those portions of this Agreement that are valid, but this
Agreement shall be construed and enforced in all respects as if the invalid or
unenforceable provision or part had been omitted.
23. Order of Precedence. In the event of any conflicts or inconsistencies between this
Agreement, its attachments, and exhibits, such conflicts and inconsistencies will
be resolved by reference to the documents in the following order of priority:
A. this Agreement (excluding attachments and exhibits);
B. its attachments; followed by its exhibits;
C. the bid solicitation document including any addenda (Exhibit 1 ); then,
D. the Contractor's bid response (Exhibit 2).
24. Certificate of Interested Parties. Contractor agrees to comply with Texas
Government Code Section 2252.908, as it may be amended, and to complete
Form 1295 "Certificate of Interested Parties" as part of this Agreement if required
by said statute.
25. Governing Law. Contractor agrees to comply with all federal, Texas, and City
laws in the performance of this Agreement. The applicable law for any legal
disputes arising out of this Agreement is the law of the State of Texas, and such
Service Agreement-Mary Rhodes Pipeline Phase 11 (PM & Reconditioning) Page 6 of 8
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
form and venue for such disputes is the appropriate district, county, orjustice court
in and for Nueces County, Texas.
26. Public Information Act Requirements. This paragraph applies only to agreements
that have a stated expenditure of at least $1,000,000 or that result in the
expenditure of at least $1,000,000 by the City. The requirements of Subchapter J,
Chapter 552, Government Code, may apply to this contract and the Contractor
agrees that the contract can be terminated if the Contractor knowingly or
intentionally fails to comply with a requirement of that subchapter.
27. Entire Agreement. This Agreement constitutes the entire agreement between the
parties concerning the subject matter of this Agreement and supersedes all prior
negotiations, arrangements, agreements and understandings, either oral or
written, between the parties.
(Signature Page Follows)
Service Agreement-Mary Rhodes Pipeline Phase 11 (PM & Reconditioning) Page 7 of 8
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
CONTRACTOR
DacuSiigrwddby:
i�t.�m.AGCGG 7YO+dt�fvtOsh.
Signature: EES
Printed Name: Randall Houghton
Title: President
10/11/2023
Date:
dOYI9,,,Fdb,9ORrP_US- CHRISTI M2023-176 Authorized By
U ' 12/5/2023
_. Council
Josh Chronley
Assistant Director of Finance - Procurement SDS
Date: 12/15/2023
Approved as to form:
DocuSigned by: ghed by:
12/13/2023
o ._ 'CTrfo UaZZ ?41]59947
Assistant City Attorney Date Rebecca Huerta
City Secretary
Attached and Incorporated by Reference:
Attachment A: Scope of Work
Attachment B: Bid/Pricing Schedule
Attachment C: Insurance and Bond Requirements
Attachment D: Warranty Requirements
Incorporated by Reference Only:
Exhibit l : RFB/RFP No. 4995
Exhibit 2: Contractor's Bid/Proposal Response
Service Agreement-Mary Rhodes Pipeline Phase 11 (PM & Reconditioning) Page 8 of 8
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
Attachment A - Scope of Work
1.1 General Requirements/Background Information
A. The Contractor shall provide pump and motor field inspections, preventative
maintenance, and pump and motor reconditioning repairs at the Mary Rhodes
Phase II River and Booster Pump Stations in Bay City, TX. The contractor will need
to coordinate with the City and the City's facility managers at Lavaca Navidad
River Authority (LNRA) to schedule site visits for any activities related to this
contract.
a. The River Pump Station has three units that pull water from the Colorado
River and pump to the settling reservoir located on the pump station site
near Bay City.
b. The Booster Pump Station has four units that pull water from the settling
reservoir and pump through a Mary Rhodes Phase II pipeline to the O.
N. Stevens Water Treatment Plant in Corpus Christi.
1.2 Scope of Work
A. River Pump Station Pump & Motor Information:
a. RPS-Pump 1
i. Flowserve m/n 36ENL-1 stage vertical oil lubricated lineshaft turbine
pump
ii. TECO/Westinghouse 200hp 12pole 460volt VSS electric motor
b. RPS-2 & 3
i. Flowserve m/n 40ENL-1 stage vertical turbine oil lubricated lineshaft
pump
ii. TECO/Westinghouse 350hp 12pole 460volt VSS electric motor
B. The Booster Pump Station Pump & Motor Information:
a. BPS-1
i. Flowserve m/n 32EMN-1 stage vertical oil lubricated lineshaft turbine
pump
ii. TECO/Westinghouse 125hp 12pole 460volt VSS electric motor
b. B PS-2, 3 & 4
i. Flowserve m/n 40CSKXL-2 stage vertical oil lubricated lineshaft turbine
pump
ii. TECO/Westinghouse 1750hp 8pole 460volt VSS electric motor
Revised 1 1.30.20
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
C. Field Inspections:
a. Inspections will be conducted in accordance with the Equipment Service
schedule. A full report will be submitted to City staff.
b. Field inspection and preventive maintenance occur twice yearly and are
termed the Semi-Annual and Annual inspections. The schedule for all
inspection services must be reviewed and approved by CCW.
c. The Semi-Annual and Annual inspection / preventive maintenance trips
include...
L The proper lockout/tag out of each unit as needed during inspection.
ii. Check and re-torque all accessible fasteners according to OEM
values.
iii. Perform a Baker motor quality test including insulation resistance
(megohm) test, dielectric absorption test, and polarization index test
at the switchgear leads of each motor at 500 volts DC for RPS-1 , RPS-
2, RPS-3, and BPS-1 and at 1000 volts DC for BPS-2, BPS-3, and BPS-4.
High potential testing (Hipot) is not to be performed unless the
obtained data indicates a problem. Retorque leads at switchgear
when complete.
iv. Check and re-torque all terminations at the motor junction boxes.
Report any found below torque limits.
v. Blowdown motor exterior at intake and exhaust locations, and
vacuum air inlet areas.
vi. Collect an oil sample from each motor bearing reservoir and have the
oil analyzed by a competent laboratory that can report the presence
of contaminants, improper oil viscosity, and water.
vii. Replace motor bearing housing lubricants with the recommended oil.
Collect waste oil and dispose offsite properly.
viii. Check and top-off pump lubricating oil reservoir levels. While units are
operating observe and record oil-drip rates and record found and left
values.
ix. Check the grease reservoir level and top off. Observe and record
automatic greasing intervals. Report found and left valves.
x. Check pump shaft rotation by-hand or by hand wrench. Check to
see that shaft rotates smoothly without binding.
A. Uncouple pump from motor and measure impeller lift. Record found
and left impeller lift.
xii. Using a dial indicator measure and record shaft and coupling runouts.
Measure and report runout in thousandths of an inch at the motor
Revised 1 1.30.20
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
shaft, motor half-coupling, adjusting nut, pump-half coupling, and
pump shaft runout.
xiii. Prior to operation record all resistance temperature detector (RTD) idle
readings, take background vibration readings. During operation
record flow readings, and pressure gauge/water level readings.
xiv. Run each unit and record RTD readings. Collect a full set of vibration
readings (filtered and unfiltered). Collect electrical readings (voltage,
current, and power factor). Collect flow rate, discharge pressure,
suction pressure (or level), shaft rpm, and operating hours. Observe
and report any significant change in oil level, alarming noises, and/or
any oil leaks.
d. Provide a detailed report on the results of each inspection and preventive
maintenance trip. Report all measurement results for each inspection.
Provide measured values in tabular form. Present hydraulic measurement
overlayed on the factory pump performance test reports. Include the oil
analysis reports for each motor bearing reservoir. Tabulate the oil analysis
results with previous historical results. Include the Baker test reports. Tabulate
the insulation resistance (megger) readings and polarization index readings
for each motor with previous historical results. For each table of data, define
allowable tolerances and/or limits as appropriate.
e. For the annual report also perform a complete vibration analysis of collected
data compared to historical data. Review FFT results and the motor rolling
element bearing frequencies to identify any bearing faults.
f. Report any issues, provide discussion about possible causes, draw
conclusions, make recommendations, and define next actions.
g. Neatly assemble all field documents with reports and any digital
photographs used to describe a condition and submit the document by
email in a .pdf format that includes bookmarks.
h. The complete report shall be submitted for CCW review within 15 calendar days of
the date of service. If requested by CCW, a conference call will be scheduled to
discuss the results.
D. General Repairs:
a. General machine work and/or repair shall consist of but not limited to
balancing, welding, thermal stress relieving, straightening, grinding, custom
part manufacturing, shaft rebuilding and fabricating, sand blasting, and
pump protective coating.
b. The Contractor shall clean using high-pressure spray, steam, grit and/or
solvent before attempting to make accurate measurements, and for non-
destructive evaluation after teardown.
Revised 1 1.30.20
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
c. After repairs, the pump(s) shall be repainted/coated to original equipment
manufacturer (OEM) paint systems, in a color approved by the City
d. The City's equipment while in Contractor's possession must be properly
stored and secured at all times.
e. The City reserves the right to inspect the pump at any time during the
recondition repair.
f. If the repair cost exceeds the amount provided in the quote/pricing
schedule, then the Contractor shall provide comparative analysis between
the replacement and repair costs. The City may decide to buy new pump
through a new solicitation.
g. After repairs are completed, a mechanical documentation repair report
must be submitted. The report shall contain the following: cover page, as
received photographs and final photographs, rotor drawings showing run
out and sizes before and after repairs, balance report and Non-Destructive
Testing reports.
h. The City may ask for prioritization for emergency repairs.
E. Field Removal and Transportation to Shop
Contract includes removal of the complete assembly including the pump
and motor and the transportation of the equipment to contractor's shop for
teardown, inspection, and report. Note that the River Pumps require a crew
to enter the wet well to disassemble the column stabilizer device and unwire
motors and pumps. A work plan for removal including a confined space
entry plan shall be submitted for review prior to the start of such work. The
motor reservoir shall be drained into proper waste containers. The shaft shall
be blocked and secured for safe transportation. Pumping components shall
be disassembled and blocked for safe transportation. The wet well access
shall be secured with a protective covering. All electors conductors shall be
protected and the entire site is to be safely secured. The pumping assembly
shall then be transported safely to the repair shop(s).
F. Pump Teardown Inspection and Report
Disassemble pump completely and clean for inspection. Measure and
record all critical dimensions including fits, clearances, and interference fits.
Inspect the shaft condition and report journal diameter and condition.
Report shaft straightness values in at three (3) respective locations noted by
Revised 1 1.30.20
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
compass orientation. Take photographs of all fits and wearing areas. Take
photographs of all areas of erosion, corrosion, and fatigue. Also, provide a
qualitative evaluation of the condition of each major part. Provide a
detailed report with measurements in tabular form that includes acceptable
limits and / or tolerances as needed for evaluation. The report shall include
a written discussion/summary of the inspection results. Provide a conclusion
section to roll up the discussion area into key issues. Make recommendations
on reuse, replacement, and components requiring reconditioning.
G. Motor Teardown Inspection and Report
Receive motor, visually inspect and document as received condition
including photographs. Perform incoming Baker motor testing including
continuity test, insulation resistance (megger) test, dielectric absorption test,
and polarization index test. Do not perform a Hi-Pot test unless other values
show motor has a problem. Disassemble motor completely. Record the
end-play found at disassembly on this high thrust motor. Clean components
as needed to perform incoming inspections. Measure and record bearing
housing bores to four decimal places. Check and report on whether results
are within tolerance. Measure and record shaft journal dimensions, and
shaft seal dimensions and report compared to tolerances. Measure and
record dimensions of bearings at ID and at OD. Record bearing descriptors
(i.e. brand and bearing number). Report on visual condition of these
surfaces. Measure rotor shaft total indicator runout (TIR) to three decimal
places. Visually inspect stator, end turns, ties, wedges, coils, leads, lugs and
bracing system, and report any concerns. Visually inspect for any loose or
broken rotor bars. Report cracking on end rings. Inspect and test stator
temperature detectors. Inspect and test space heaters. Inspect and test
bearing temperature detectors. Clean and oven dry stator and rotor.
Perform another Baker test if incoming testing was low.
H. Pump Recondition Repair
Six pad weld registers on columns and discharge head, and re-machine
registers, faces, and bores to restore concentricity and parallelism to 0.005-
inches TIR. Inspect bowls and six pad weld if needed and re-machine
registers, faces, and bores to restore concentricity and parallelism to 0.005-
inches TIR. Replace bowl bearings and column enclosing tube bearings.
Revised 1 1.30.20
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
Face each end of each enclosing tube to be perpendicular to the bearing
bore. Replace tube tension nut bearing. Clean, polish, and straighten bowl
shaft, line shafts, and head shaft to within 0.003-inches TIR. Two-plane
dynamically balance impeller(s) on the bowl shaft or on a mandrel to
precision balance grade ISO G2.5. Grit blast to Near While the bowl ODs
and IDs, the exterior of the enclosing tubes, the ID and OD of column pipe,
and ID and OD of discharge head and coat to the original OEM coating
specification. Crate the pump components for shipment.
I. Motor Recondition Repair
Varnish and bake stator and rotor. Two-plane dynamically balance rotor to
precision grade balance of ISO G2.5. Clean component parts and
assemble. Set end-play to proper value. Run motor unloaded and record
amps, winding temperatures, bearing temperatures, and vibration
amplitudes. Paint motor to original OEM coating specifications. Provide a
finished repair report to provide all readings. Mound the motor on dunnage,
block the shaft, and prepare for shipment.
J. Transportation To Jobsite with Pump Installation and Startup
Return pump and motor to jobsite and reinstall. For the River Pumps,
reconnect the column brace in the wet well without introducing any
misalignment. Install the pump and motor and reconnect to the discharge
connection. Check alignment at coupling area. Furnish oil for motor
reservoirs and for lineshaft lubrication. Furnish grease for lower bearing
lubrication. Reconnect wiring. Perform startup and operate unit for at least
3 hours. Provide an installation and startup report. Startup report shall be
provided to CCW within 3 weeks of the completion of the work.
K. Schedule of Work:
a. Repairs to the pumps and motors will be on a per need basis based on
equipment findings, conditions, along with contractor recommendations.
CCW will direct and approve the initiation of all work.
b. In the event a pump or motor needs to be pulled for inspection and or repair,
a complete schedule shall be provided and accepted by City point of
contact.
Revised 1 1.30.20
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
c. The repair(s) information will be provided to the Contractor through
work/task order or phone/email request.
d. The Contractor will be responsible for picking up and delivering the pumps.
e. Upon receipt of pump, the Contractor will inspect the pump and submit an
inspection report and repair estimate based on quote/pricing schedule. The
report shall include inspection results, conclusion/recommendations, and
visual findings by drawings or digital photos, including a "No Destructive
Testing Report" added to the "As Received Report". The Contractor shall
submit estimated repair time, and parts to be replaced including lead time.
The inspection report shall be submitted electronically in PDF format via
email.
f. The Contractor shall make a reasonable effort to ensure that all parts are
original equipment manufacturer (OEM). The Contractor shall include the
lead time and shipping costs for OEM parts in the repair estimate. If the lead
time for an OEM part will cause the repair time to exceed 30 days, then the
City may approve non-OEM parts and materials.
g. The Contractor will provide the report within 15 business days after receipt of
equipment. For larger or specialty pumps that may require longer than 15
days, the Contractor shall notify the City prior to the end of 15 business days
so additional time can be negotiated as warranted.
h. The repairs shall be completed within 30 calendar days of Contractor receipt
of approval from the Contract Administrator. Any repairs that require
additional time due to material lead-times must be submitted for review and
approval.
i. The contractor will need to coordinate with the City and the City's facility
managers at Lavaca Navidad River Authority (LNRA) to schedule any site
visits for any activities related to this contract requirements.
1.3 Contract Pricing
A. All pricing shall be as outlined in the Bid Form.
B. An allowance line item will be utilized to cover additional work and materials
that are required but not included in the other contract line items. The
allowance amount will not be issued as a lump sum amount, proper support
and documentation must be provided to support the request to utilize the
allowance line item.
C. The Contractor's invoice shall not exceed the estimated amount in the
quote/pricing schedule previously authorized by the Contract Administrator
in writing prior to the work being performed.
Revised 1 1.30.20
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
1.4 Invoicing
The Contractor shall submit an itemized invoice for payment, which shall include
the following information:
a. Purchase Order (P.0) Number and Service Agreement Number
b. Pump Location/Address
c. Serial number of equipment
d. Description of Service
e. Total hours billed; Overtime hours will include a written approval by City
staff.
f. Itemized list of parts/materials
g. Invoices for parts/materials (to verify markup)
h. Shipping costs for parts/materials
1.5 Warranty
A. The Contractor shall warrant that work performed conforms to the specification
and is free of any defects in equipment, material or workmanship performed by
the contractor or any of its subcontractors or suppliers. All work provided by the
Contractor shall be warranted for a minimum period of 1 year from the date of
final acceptance of the work.
B. Material shall be warranted against material defects and defects in
workmanship for a period of 1 year. The warranty period shall commence
upon date of acceptance by the City. If the manufacturer's standard
warranty period exceeds one year, then the warranty period hereunder shall
be the length of the manufacturer's warranty. The Contractor shall be
responsible for the warranty. The Contractor shall provide the City with all
manufacturer's warranty documents upon completion of service.
C. The Contractor must provide onsite technical support within 24 hours of
notification by the City.
1.6 Contractor Quality Control and Superintendence
The Contractor shall establish and maintain a complete Quality Control Program
that is acceptable to the Contract Administrator to assure that the requirements of
the Contract are provided as specified. The Contractorwill also provide supervision
of the work to insure it complies with the contract requirements.
Revised 1 1.30.20
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
1.7 Points of Contact
Maria Corona Esteban Ramos
Engineer III Water Resources Manager
2726 Holly Road 2726 Holly Road
Corpus Christi, Texas 78415 Corpus Christi, Texas 78415
0: 361-826-1826 0: 361-826-3294
MariaCRCE?cctexas.com Esteban KCEcctexas.com
Revised 11.30.20
Page 28 of 29
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
Attachment B - Bid Pricing Schedule
opus c
CITY OF CORPUS CHRISTI
0
CONTRACTS AND PROCUREMENT
BID FORM
IRFB No. 4995
1852 Preventive Maintenance and Reconditioning of
Pumps and Motors
P/Z PAGE I OF 5
Date: 2
Authorized
7/
r
Bidder: /� XE
)W/ Signature:
1. Refer to "Instructions to Bidders" and Contract Terms and Conditions before
completing bid.
2. Quote your best price for each item.
3. In submitting this bid, Bidder certifies that:
a. the prices in this bid have been arrived at independently, without consultation,
communication, or agreement with any other Bidder or competitor, for the
purpose of restricting competition with regard to prices.
b. Bidder is an Equal Opportunity Employer, and the Disclosure of Interest information
on file with City's Contracts and Procurement office, pursuant to the Code of
Ordinances, is current and true.
c. Bidder is current with all taxes due and company is in good standing with all
applicable governmental agencies.
d. Bidder acknowledges receipt and review of all addenda for this RFB.
Field Inspections:
Description Delivery QTY Unit Quoted Total
name Price
Special Inspection - River Pump 0
Station RPS 2 $ li $ 21
Semi-Annual Inspection - River
Pump Station RPS 6 $ $
Annual Inspection - River Pump7qo ,! 11
Station RIPS 3 $ 11 $
Special Inspection - Booster / qye
Pump Station BPS 2 $ $
Semi-Annual Inspection - f
Booster Pump Station BPS 6 $ 1-2 0,
Annual Inspection - Booster 3, q
Pump Station BPS 3 $ $ Mi 20
4-
Sub Total $ j
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
Reconditioning Repairs:
1. River Pump Station - Pump I RPS-PI)
Item Description Delivery QTY Unit Quoted
name Price
Item of Pull RPS-P1 Motor and haul 2 7 0
a to shop RPS- PI 1 $
Item of Pull RPS-P1 Pump and haul1 $ 3 1 YOO
b to shop RPS- P1
c Tearclown and Inspect Pump RPS- PI 1 $
d Tearclown and Inspect Motor RPS- P1 1 $ /1700
6) 00
e Repair Pump RPS- P1 1 $ J r
f Repair Motor RPS- PI 1 $ /Z 71
- 9 Install Pump and Motor RPS- PI 1 $
,2 00
h Startup Pump and Motor RPS- PI 1 $ 1
i Performance Test RPS- PI 1 $ 2 Od
I e-,0
Sub Total V
2. River Pump Station - Pump 2 (RPS-P2)
Item Description Delivery QTY Unit Quoted
name Price
a Item of Pull RPS-P2 Motor and haul RPS- P2 1 $
to shop
b Item of Pull RPS-P2 Pump and haul RPS- P2 I $
to shop 3j fbt
c Tearclown and Inspect Pump RPS- P2 1
$ P
d Teardown and Inspect Motor RPS- P2 1 $ il 7000-1
e Repair Pump RPS- P2 I $ 0 0 0
f Repair Motor RPS- P2 1
$ 01)
9 Install Pump and Motor RPS- P2
$ 600
h Startup Pump and Motor RPS- P2 1 $
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
/ zoo
i Performance Test P2 1 $ e`'
Sub Total $ C)o
3. River Pump Station - Pump 3 (RPS-P3)
Item Description Delivery QTY Unit Quoted Price
name
Item of Pull RPS-P3 Motor and haul '70 0
a to shop RPS- P3 1 $ 2,
Item of Pull RPS-P3 Pump and haul -.0
b to shop RPS- P3 1 $ _. &0
c Teardown and Inspect Pump RPS- P3 I $ foo
d Tearclown and Inspect Motor RPS- P3 I $ '7 0 0
/V 0
e Repair Pump RPS- P3 1 $ 0 0
f_ Repair Motor RPS- P3 I $ 35, boo
. 9 Startup Pump and Motor RPS- P3 I $ /, z 6)0
,A- 0
'D
h Install Pump and Motor RPS- P3 1 $ , /
/ 2CO
i Performance Test RPS- P3 1 $
Sub Total
4. Booster Pump Station - Pump 1 (BPS-P1)
Item Description Delivery QTY Unit Quoted Price
name
Item of Pull BPS-PI Motor and haul 7 0 t)
a to shop BPS-P1 1 $ /-)
Item of Pull BPS-P1 Pump and haul $ 3�foo
b to shop BPS-P1 1
-,
- ati
C Tearclown and Inspect Pump BPS-P1 I $ 5,,f 0 0
d Tearclown and Inspect Motor BPS-P1 1 $ '100
e Repair Pump BPS-P1 1 $ S-O 0
f_ Repair Motor BPS-P1 1 $ '1, 6,00
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BC-CA804FBE
Install Pump and Motor BPS-P1 1 $
h Startup Pump and Motor BPS-P1 1 J, 201)
20
i I Performance Test BPS-PI 1 $
Sub Total s f
/0 0
5. Booster Pump Station -Pump 2 (BPS-P2)
Item Description Delivery QTY Unit Quoted Price
name
Item of Pull BPS-P2 Motor and haul
a to shop BPS-P2 I
Item of Pull BPS-P2 Pump and haul $ 2TO
b to shop BPS-P2 I
C Teardown and Inspect Pump BPS-P2 1 $
d Teardown and Inspect Motor BPS-P2 1 $
e Repair Pump BPS-P2 1 $ 2! -O
f Repair Motor BPS-P2 1 $ ys-
- 9 Install Pump and Motor BPS-P2 1 $ 2 e'O
h Startup Pump and Motor BPS-P2 I $ J
i Performance Test BPS-P2 I $
-
Sub Total /zs
6. Booster Pump Station - Pump 3 (BPS-P3)
Item Description Delivery QTY Unit Quoted Price
name
Item of Pull BPS-P3 Motor and haul j')
a to shop BPS-P3 1 $ 0 0
Item of Pull BPS-P2 Pump and haul .
b to shop BPS-P3 1 $ 2T&
C Teardown and Inspect Pump BPS-P3 1 $
d Teardown and Inspect Motor BPS-P3 1 $
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
e Repair Pump BPS-P3 1 $
f_ Repair Motor BPS-P3 I $
$ 7, 200
- 9 Install Pump and Motor BPS-P3 1
h Startup Pump and Motor BPS-P3 I $ 00
i Performance Test BPS-P3 1 - $ 'POO
$ /Z "ed,
.s- -7sd
Sub Total
7. Booster Pump Station -Pump 4 (BPS-P4)
Item Description Delivery QTY Unit Quoted Price
name
Item of Pull BPS-P4 Motor and haul
'70 0
a to shop BPS-P4 I $ 2
Item of Pull BPS-P4 Pump and haul
b to shop BPS-P4 1 $
C Teardown and Inspect Pump BPS-P4 I $
d Teardown and Inspect Motor BPS-P4 I $
e Repair Pump BPS-P4 1 $ 5-2, 0,5�-O
f Repair Motor BPS-P4 1 $ /�j 0 0
- 9 Install Pump and Motor BPS-P4 1 $ 7 ;?00
0
h Startup Pump and Motor BPS-P4 I $ �0
i Performance Test BPS-P4 1 $ ido
Sub Total 12-5- '76 d
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
8. Allowance
DESCRIPTION QTY UNIT PRICE PRICE TOTAL
Allowance as described in
section 4.3 (B) Labor 1 $ 10,000 $ 10,000
Allowance as described in 1 $ 40,000 $ 40,000
section 4.3 (B) Parts and Material
Sub Total $ 57D/ O()L
Total Contract Price $ 16 t 330
1
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
Attachment C - Insurance Requirements
CONTRACTOR'S LIABILITY INSURANCE
A. Contractor must not commence work under this agreement until all insurance
required has been obtained and such insurance has been approved by the City.
Contractor must not allow any subcontractor Agency to commence work until all
similar insurance required of any subcontractor Agency has been obtained.
B. Contractor must furnish to the City's Risk Manager and Contract Administer one (1)
copy of Certificates of Insurance (COI) with applicable policy endorsements
showing the following minimum coverage by an insurance company(s)
acceptable to the City's Risk Manager. The City must be listed as an additional
insured on the General liability and Auto Liability policies by endorsement, and a
waiver of subrogation is required on all applicable policies. Endorsements must be
provided with COI. Project name and or number must be listed in Description Box
of COI.
TYPE OF INSURANCE MINIMUM INSURANCE COVERAGE
Commercial General Liability Including: $1 ,000,000 Per Occurrence
1 . Commercial Broad Form
2. Premises - Operations
3. Products/Completed Operations
4. Contractual Liability
5. Independent Contractors
6. Personal Injury- Advertising Injury
AUTO LIABILITY (including) $500,000 Combined Single Limit
1 . Owned
2. Hired and Non-Owned
3. Rented/Leased
WORKERS' COMPENSATION Statutory
EMPLOYER'S LIABILITY $500,000 /$500,000 /$500,000
Revised 1 1.30.20
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
C. In the event of accidents of any kind related to this agreement, Contractor must
furnish the Risk Manager with copies of all reports of any accidents within 10 days
of the accident.
II. ADDITIONAL REQUIREMENTS
A. Applicable for paid employees, Contractor must obtain workers' compensation
coverage through a licensed insurance company. The coverage must be written
on a policy and endorsements approved by the Texas Department of Insurance.
The workers' compensation coverage provided must be in an amount sufficient to
assure that all workers' compensation obligations incurred by the Contractor will
be promptly met.
B. Contractor shall obtain and maintain in full force and effect for the duration of this
Contract, and any extension hereof, at Contractor's sole expense, insurance
coverage written on an occurrence basis, by companies authorized and admitted
to do business in the State of Texas and with an A.M. Best's rating of no less than A-
VII.
C. Contractor shall be required to submit a copy of the replacement certificate of
insurance to City at the address provided below within 10 days of the requested
change. Contractor shall pay any costs incurred resulting from said changes. All
notices under this Article shall be given to City at the following address:
City of Corpus Christi
Attn: Risk Manager
P.O. Box 9277
Corpus Christi, TX 78469-9277
D. Contractor agrees that with respect to the above required insurance, all insurance
policies are to contain or be endorsed to contain the following required provisions:
• List the City and its officers, officials, employees, volunteers, and elected
representatives as additional insured by endorsement, as respects operations,
completed operation and activities of, or on behalf of, the named insured
performed under contract with the City, with the exception of the workers'
compensation policy;
• Provide for an endorsement that the "other insurance" clause shall not apply to the
City of Corpus Christi where the City is an additional insured shown on the policy;
• Workers' compensation and employers' liability policies will provide a waiver of
subrogation in favor of the City; and
Revised 1 1.30.20
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
• Provide 30 calendar days advance written notice directly to City of any,
cancellation, non-renewal, material change or termination in coverage and not
less than 10 calendar days advance written notice for nonpayment of premium.
E. Within 5 calendar days of a cancellation, non-renewal, material change or
termination of coverage, Contractor shall provide a replacement Certificate of
Insurance and applicable endorsements to City. City shall have the option to
suspend Contractor's performance should there be a lapse in coverage at any
time during this contract. Failure to provide and to maintain the required insurance
shall constitute a material breach of this contract.
F. In addition to any other remedies the City may have upon Contractor's failure to
provide and maintain any insurance or policy endorsements to the extent and
within the time herein required, the City shall have the right to order Contractor to
remove the exhibit hereunder, and/or withhold any payment(s) if any, which
become due to Contractor hereunder until Contractor demonstrates compliance
with the requirements hereof.
G. Nothing herein contained shall be construed as limiting in any way the extent to
which Contractor may be held responsible for payments of damages to persons or
property resulting from Contractor's or its subcontractor's performance of the work
covered under this agreement.
H. It is agreed that Contractor's insurance shall be deemed primary and non-
contributory with respect to any insurance or self insurance carried by the City of
Corpus Christi for liability arising out of operations under this agreement.
I. It is understood and agreed that the insurance required is in addition to and
separate from any other obligation contained in this agreement.
2023 Insurance Requirements
Ins. Req. Exhibit 4-B
Contracts for General Services - Services Performed Onsite
01/01/2023 Risk Management - Legal Dept.
Revised 1 1.30.20
DocuSign Envelope ID:OA5DADC9-146D-45F7-9227-C3BCCA804FBE
Attachment D - Warranty Requirements
A. The Contractor shall warrant that work performed conforms to the
specification and is free of any defects in equipment, material or
workmanship performed by the contractor or any of its subcontractors or
suppliers. All work provided by the Contractor shall be warranted for a
minimum period of 1 year from the date of final acceptance of the work.
B. Material shall be warranted against material defects and defects in
workmanship for a period of 1 year. The warranty period shall commence
upon date of acceptance by the City. If the manufacturer's standard
warranty period exceeds one year, then the warranty period hereunder
shall be the length of the manufacturer's warranty. The Contractor shall
be responsible for the warranty. The Contractor shall provide the City with
all manufacturer's warranty documents upon completion of service.
C. The Contractor must provide onsite technical support within 24 hours of
notification by the City.