HomeMy WebLinkAboutC2024-226 - 12/10/2024 - Approved ,bus c
G�
H SERVICE AGREEMENT NO. 6293
U
CONTRACT FOR PROFESSIONAL SERVICES
�a�CilpoR SEA
1852
FOR PROJECT 24133 — North Padre Island's Michael J. Ellis Seawall
Improvements
The City of Corpus Christi, a Texas home rule municipal corporation, P.O. Box 9277, Corpus Christi,
Nueces County, Texas 78469-9277 (City) acting through its duly authorized City Manager or Designee
(Director) and Hanson Professional Services, (Consultant), hereby agree as follows:
TABLE OF CONTENTS
ARTICLE NO. TITLE PAGE
ARTICLE I SCOPE OF SERVICES...................................................................2
ARTICLE II QUALITY CONTROL.......................................................................3
ARTICLE III COMPENSATION............................................................................3
ARTICLE IV TIME AND PERIOD OF SERVICE ..................................................5
ARTICLE V OPINIONS OF COST ......................................................................5
ARTICLE VI INSURANCE REQUIREMENTS......................................................5
ARTICLE VII INDEMNIFICATION.........................................................................6
ARTICLE VIII TERMINATION OF AGREEMENT ..................................................6
ARTICLE IX RIGHT OF REVIEW AND AUDIT ....................................................7
ARTICLE X OWNER REMEDIES .......................................................................8
ARTICLE XI CONSULTANT REMEDIES.............................................................8
ARTICLE XII CLAIMS AND DISPUTE RESOLUTION ..........................................8
ARTICLE XIII MISCELLANEOUS PROVISIONS.................................................10
EXHIBITS
Contract for Professional Services
Page 1 of 12
ARTICLE I — SCOPE OF SERVICES
1.1 City and Consultant agree that the services provided are properly described in the Scope of Services,
which is incorporated herein and attached to this Agreement as Exhibit A. The Scope of Services shall include
all associated services required for Consultant to provide such Services, pursuant to this Agreement, and any
and all Services that would normally be required by law or common due diligence in accordance with the standard
of care defined in Article XIII of this Agreement. The approved Scope of Services defines the services to be
performed by Consultant under this Agreement. Consultant will perform the Services in accordance with Exhibit
A and with Consultant's response to the Request for Qualifications related to this project, which response is
incorporated by reference into this Agreement as if set out here in its entirety.
1.2 Consultant shall follow City Codes and Standards effective at the time of the execution of the contract.
At review milestones, the Consultant and City will review the progress of the plans to ensure that City Codes and
Standards are followed unless specifically and explicitly excluded from doing so in the approved Scope of
Services attached as Exhibit A. A request made by either party to deviate from City standards after the contract
is executed must be in writing.
1.3 Consultant shall provide labor, equipment and transportation necessary to complete all services agreed
to hereunder in a timely manner throughout the term of the Agreement. Persons retained by Consultant to
perform work pursuant to this Agreement shall be employees or subconsultants of Consultant. Upon request,
Consultant must provide City with a list of all subconsultants that includes the services performed by
subconsultant and the % of work performed by subconsultant (in dollars). Changes in Consultant's proposed
team as specified in the SOQ or Scope of Services must be agreed to by the City in writing.
1.4 Consultant shall not begin work on any phase/task authorized under this Agreement until they are briefed
on the scope of the Project and are notified in writing to proceed. If the scope of the Project changes, either
Consultant or City may request a review of the changes with an appropriate adjustment in compensation.
1.5 Consultant will provide monthly status updates (project progress or delays) in the format requested by
the City with each monthly invoice.
1.6 For design services, Consultant agrees to render the professional services necessary for the
advancement of the Project through Final Completion of the Construction Contract. Consultant acknowledges
and accepts its responsibilities, as defined and described in City's General Conditions for Construction Contracts,
excerpt attached as Exhibit D.
1.6.1 The Consultant agrees to serve as the City's Designer as defined in the General Conditions and
will consult and advise the City on matters related to the Consultant's Scope of Services during the
performance of the Consultant's services.
1.6.2 The Consultant agrees to prepare plans, specification, bid and contract documents and to analyze
bids and evaluate the documents submitted by bidders.
1.6.3 The Consultant agrees to assist the City in evaluating the qualifications of the prospective
contractors, subcontractors and suppliers.
1.7 For projects that require subsurface utility investigation:
1.7.1 The Consultant agrees to prepare and submit to the City prior to the 60% submittal a signed and
sealed report identifying all utilities within the project area at the Quality Level specified in Exhibits A
and A-1. It is assumed that all utilities will be identified using Quality Level A exploratory excavation
unless stated otherwise.
Contract for Professional Services
Page 2 of 12
1.7.2 Utilities that should be identified include but are not limited to utilities owned by the City, local
franchises, electric companies, communication companies, private pipeline companies and 3rd party
owners/operators.
1.8 For project with potential utility conflicts:
1.8.1 The Consultant agrees to coordinate the verification and resolution of all potential utility conflicts.
1.8.2 The Consultant agrees to prepare and submit a monthly Utility Coordination Matrix to the City.
1.9 The Consultant agrees to complete the Scope of Services in accordance with the approved project
schedule and budget as defined in Exhibit A, including completing the work in phases defined therein.
1.10 The Consultant agrees to conduct all communication through and perform all project-related functions
utilizing the City's project management system known as e-Builder. This includes all correspondence,
submittals, payment requests and processing, contract amendments and construction phase activities.
ARTICLE II — QUALITY CONTROL
2.1 The Consultant agrees to perform quality assurance-quality control/constructability reviews (QCP
Review). The City reserves the right to retain a separate consultant to perform additional QCP services for the
City.
2.2 The Consultant will perform QCP Reviews at intervals during the Project to ensure deliverables satisfy
applicable industry quality standards and meet the requirements of the Project scope. Based on the findings of
the QCP Review, the Consultant must reconcile the Project Scope and the Opinion of Probable Cost (OPC), as
needed.
2.3 Final construction documents that do not meet City standards in effect at the time of the execution of
this Agreement may be rejected. If final construction documents are found not to be in compliance with this
Agreement, Consultant will not be compensated for having to resubmit documents.
ARTICLE III — COMPENSATION
3.1 The Compensation for all services (Basic and Additional) included in this Agreement and in the Scope of
Services for this Agreement shall not exceed $ 1,181,870.00.
3.2 The Consultant's fee will be on a lump sum or time and materials (T&M) basis as detailed in Exhibit A
and will be full and total compensation for all services and for all expenses incurred in performing these services.
Consultant shall submit a Rate Schedule with their proposal.
3.3 The Consultant agrees to complete the Scope of Services in accordance with the approved project
schedule and budget as defined in Exhibit A, including completing the work in phases defined therein.
3.4 The Director of Engineering Services may request the Consultant to undertake additional services or
tasks provided that no increase in fee is required. Services or tasks requiring an increase of fee will be mutually
agreed and evidenced in writing as an amendment to this contract. Consultant shall notify the City within three
(3) days of notice if tasks requested requires an additional fee.
Contract for Professional Services
Page 3 of 12
3.5 Monthly invoices will be submitted in accordance with the Payment Request as shown in Exhibit B. Each
invoice will include the Consultant's estimate of the proportion of the contracted services completed at the time
of billing. For work performed on a T&M Basis, the invoice shall include documentation that shows who worked
on the Project, the number of hours that each individual worked, the applicable rates from the Rate Schedule
and any reimbursable expenses associated with the work. City will make prompt monthly payments in response
to Consultant's monthly invoices in compliance with the Texas Prompt Payment Act.
3.6 Principals may only bill at the agreed hourly rate for Principals (as defined in the Rate Schedule) when
acting in that capacity. Principals acting in the capacity of staff must bill at applicable staff rates.
3.7 Consultant certifies that title to all services covered by a Payment Request shall pass to City no later than
the time of payment. Consultant further certifies that, upon submittal of a Payment Request, all services for
which Payment Requests have been previously issued and payments received from City shall, to the best of
Consultant's knowledge, information and belief, be free and clear of liens, claims, security interests or
encumbrances in favor of Consultant or other persons or entities making a claim by reason of having provided
labor or services relating to this Agreement. Consultant shall indemnify and hold City harmless from
any liens, claims, security interests or encumbrances filed by anyone claiming by, through or
under the items covered by payments made by City to Consultant.
3.8 The final payment due hereunder shall not be paid until all reports, data and documents have been
submitted, received, accepted and approved by City. Final billing shall indicate "Final Bill — no additional
compensation is due to Consultant."
3.9 City may withhold compensation to such extent as may be necessary, in City's opinion, to protect City
from damage or loss for which Consultant is responsible, because of:
3.9.1 delays in the performance of Consultant's work;
3.9.2 failure of Consultant to make payments to subconsultants or vendors for labor, materials or
equipment;
3.9.3 damage to City; or
3.9.4 persistent failure by Consultant to carry out the performance of its services in accordance with this
Agreement.
3.10 When the above reasons for withholding are removed or remedied by Consultant, compensation of the
amount withheld shall be made within 30 days. City shall not be deemed in default by reason of withholding
compensation as provided under this Agreement.
3.11 In the event of any dispute(s) between the Parties regarding the amount properly compensable for any
phase or as final compensation or regarding any amount that may be withheld by City, Consultant shall be
required to make a claim pursuant to and in accordance with the terms of this Agreement and follow the
procedures provided herein for the resolution of such dispute. In the event Consultant does not initiate and
follow the claims procedures as required by the terms of this Agreement, any such claim shall be waived.
3.12 Request of final compensation by Consultant shall constitute a waiver of claims except those previously
made in writing and identified by Consultant as unsettled at the time of final Payment Request.
3.13 All funding obligations of the City under this Agreement are subject to the appropriation of funds in its
annual budget. The City may direct the Consultant to suspend work pending receipt and appropriation of funds.
Contract for Professional Services
Page 4 of 12
The right to suspend work under this provision does not relieve the City of its obligation to make payments in
accordance with section 3.5 above for services provided up to the date of suspension.
ARTICLE IV— TIME AND PERIOD OF SERVICE
4.1 This Agreement shall be effective upon the signature of the City Manager or designee (Effective Date).
4.2 The term of this Agreement will be for a period of six years beginning on the effective date, unless
extended by authority of the City Manager or designee.
4.3 The Consultant agrees to begin work on those authorized Services for this contract upon receipt of the
Notice to Proceed from the Contracts and Procurement Department. Work will not begin on any phase or any
Additional Services until requested in writing by the Consultant and written authorization is provided by the
Director of Engineering Services.
4.4 Time is of the essence for this Agreement. Consultant shall perform and complete its obligations under
this Agreement in a prompt and continuous manner so as to not delay the Work for the Project, in accordance
with the schedules approved by City. The Consultant and City are aware that many factors may affect the
Consultant's ability to complete the services to be provided under this agreement. The Consultant must notify
the City within ten business days of becoming aware of a factor that may affect the Consultant's ability to
complete the services hereunder.
4.5 City shall perform its obligations of review and approval in a prompt and continuous manner so as to not
delay the project.
4.6 This Agreement shall remain in force for a period which may reasonably be required for completion of
the Project, including any extra work and any required extensions thereto, unless terminated as provided for in
this Agreement. For construction design services, "completion of the Project" refers to acceptance by the City
of the construction phase of the Project, i.e., Final Completion.
ARTICLE V— OPINIONS OF COST
5.1 The Opinion of Probable Cost (OPC) is computed by the Consultant and includes the total cost for
construction of the Project.
5.2 The OPC does not include the cost of the land, rights-of-way or other costs which are the responsibility
of the City.
5.3 Since Consultant has no control over a construction contractor's cost of labor, materials or equipment, or
over the contractor's methods of determining prices, or over competitive bidding or market conditions,
Consultant's opinions of probable Project Cost or Construction Cost provided herein are to be made on the basis
of Consultant's experience and qualifications and represent Consultant's best judgment as a design professional
familiar with the construction industry, but Consultant cannot and does not guarantee proposals, bids or the
construction cost shall not vary from the OPC prepared by Consultant.
ARTICLE VI — INSURANCE REQUIREMENTS
6.1 Consultant must not commence work under this Agreement until all insurance required has been obtained
and such insurance has been approved by the City. Consultant must not allow any subcontractor to commence
work until all similar insurance required of any subcontractor has been obtained.
Contract for Professional Services
Page 5 of 12
6.2 Insurance Requirements are shown in EXHIBIT C.
ARTICLE VII — INDEMNIFICATION
Consultant shall fully indemnify and hold harmless the City of Corpus Christi and its officials,
officers, agents, employees, excluding the engineer or architect or that person's agent,
employee or subconsultant, over which the City exercises control ("Indemnitee") from and
against any and all claims, damages, liabilities or costs, including reasonable attorney fees and
court costs, to the extent that the damage is caused by or results from an act of negligence,
intentional tort, intellectual property infringement or failure to pay a subcontractor or supplier
committed by Consultant or its agent, Consultant under contract or another entity over which
Consultant exercises control while in the exercise of rights or performance of the duties under
this agreement. This indemnification does not apply to any liability resulting from the negligent
acts or omissions of the City or its employees, to the extent of such negligence.
Consultant shall defend Indemnitee, with counsel satisfactory to the City Attorney, from and
against any and all claims, damages, liabilities or costs, including reasonable attorney fees and
court costs, if the claim is not based wholly or partly on the negligence of, fault of or breach of
contract by Indemnitee. If a claim is based wholly or partly on the negligence of, fault of or
breach of contract by Indemnitee, the Consultant shall reimburse the City's reasonable
attorney's fees in proportion to the Consultant's liability.
Consultant must advise City in writing within 24 hours of any claim or demand against City or
Consultant known to Consultant related to or arising out of Consultant's activities under this
Agreement.
ARTICLE VIII —TERMINATION OF AGREEMENT
8.1 By Consultant:
8.1.1 The City reserves the right to suspend this Agreement at the end of any phase for the convenience
of the City by issuing a written and signed Notice of Suspension. The Consultant may terminate this
Agreement for convenience in the event such suspension extends for a period beyond 120 calendar days
by delivering a Notice of Termination to the City.
8.1.2 The Consultant must follow the Termination Procedure outlined in this Agreement.
8.2 By City:
8.2.1 The City may terminate this agreement for convenience upon seven days written notice to the
Consultant at the address of record.
8.2.2 The City may terminate this agreement for cause upon ten days written notice to the Consultant.
If Consultant begins, within three days of receipt of such notice, to correct its failure and proceeds to
diligently cure such failure within the ten days, the agreement will not terminate. If the Consultant again
fails to perform under this agreement, the City may terminate the agreement for cause upon seven days
written notice to the Consultant with no additional cure period. If the City terminates for cause, the City
may reject any and all proposals submitted by Consultant for up to two years.
Contract for Professional Services
Page 6 of 12
8.3 Termination Procedure
8.3.1 Upon receipt of a Notice of Termination and prior to the effective date of termination, unless the
notice otherwise directs or Consultant takes action to cure a failure to perform under the cure period,
Consultant shall immediately begin the phase-out and discontinuance of all services in connection with
the performance of this Agreement. Within 30 calendar days after receipt of the Notice of Termination,
unless Consultant has successfully cured a failure to perform, Consultant shall submit a statement
showing in detail the services performed under this Agreement prior to the effective date of termination.
City retains the option to grant an extension to the time period for submittal of such statement.
8.3.2 Consultant shall submit all completed and/or partially completed work under this Agreement,
including but not limited to specifications, designs, plans and exhibits.
8.3.3 Upon receipt of documents described in the Termination Procedure and absent any reason why
City may be compelled to withhold fees, Consultant will be compensated for its services based upon a
Time & Materials calculation or Consultant and City's estimate of the proportion of the total services
actually completed at the time of termination. There will be no compensation for anticipated profits on
services not completed.
8.3.4 Consultant acknowledges that City is a public entity and has a duty to document the expenditure
of public funds. The failure of Consultant to comply with the submittal of the statement and documents,
as required above, shall constitute a waiver by Consultant of any and all rights or claims to payment for
services performed under this Agreement.
ARTICLE IX— RIGHT OF REVIEW AND AUDIT
9.1 Consultant grants City, or its designees, the right to audit, examine or inspect, at City's election, all of
Consultant's records relating to the performance of the Work under this Agreement, during the term of this
Agreement and retention period herein. The audit, examination or inspection may be performed by a City
designee, which may include its internal auditors or an outside representative engaged by City. Consultant
agrees to retain its records for a minimum of four years following termination of the Agreement, unless there is
an ongoing dispute under this Agreement, then such retention period shall extend until final resolution of the
dispute.
9.2 Consultant's records include any and all information, materials and data of every kind and character
generated as a result of and relevant to the Work under this Agreement (Consultant's Records). Examples
include billings, books, general ledger, cost ledgers, invoices, production sheets, documents, correspondence,
meeting notes, subscriptions, agreements, purchase orders, leases, contracts, commitments, arrangements,
notes, daily diaries, reports, drawings, receipts, vouchers, memoranda, time sheets, payroll records, policies,
procedures, and any and all other agreements, sources of information and matters that may, in City's and
Consultant's reasonable judgment, have any bearing on or pertain to any matters, rights, duties or obligations
under or covered by any Agreement Documents.
9.3 City agrees that it shall exercise the right to audit, examine or inspect Consultant's Records only during
Consultant's regular business hours. Consultant agrees to allow City's designee access to all of Consultant's
Records, Consultant's facilities and Consultant's current employees, deemed necessary by City or its
designee(s), to perform such audit, inspection or examination. Consultant also agrees to provide adequate and
appropriate work space necessary to City or its designees to conduct such audits, inspections or examinations.
9.4 Consultant shall include this audit clause in any subcontractor, supplier or vendor contract.
Contract for Professional Services
Page 7 of 12
ARTICLE X— OWNER REMEDIES
10.1 The City and Consultant agree that in the event the City suffers actual damages, the City may elect to
pursue its actual damages and any other remedy allowed by law. This includes but is not limited to:
10.1.1 Failure of the Consultant to make adequate progress and endanger timely and successful
completion of the Project, which includes failure of subconsultants to meet contractual obligations;
10.1.2 Failure of the Consultant to design in compliance with the laws of the City, State and/or federal
governments, such that subsequent compliance costs exceed expenditures that would have been
involved had services been properly executed by the Consultant.
10.1.3 Losses are incurred because of errors and/or omissions in the design, working drawings,
specifications or other documents prepared by the Consultant to the extent that the financial losses are
greater than the City would have originally paid had there not been errors and/or omissions in the
documents.
10.2 When the City incurs non-value added work costs for change orders due to design errors and/or
omissions, the City will send the Consultant a letter that includes:
(1) Summary of facts with supporting documentation;
(2) Instructions for Consultant to revise design documents, if appropriate, at Consultant's expense;
(3) Calculation of non-value added work costs incurred by the City; and
(4) Deadline for Consultant's response.
10.3 The Consultant may be required to revise bid documents and re-advertise the Project at the Consultant's
sole cost if, in the City's judgment, the Consultant generates excessive addenda, either in terms of the nature of
the revision or the actual number of changes due to the Consultant's errors or omissions.
10.4 The City may withhold or nullify the whole or part of any payment as detailed in Article III.
ARTICLE XI — CONSULTANT REMEDIES
11.1 If Consultant is delayed due to uncontrollable circumstances, such as strikes, riots, acts of God, national
emergency, epidemics, acts of the public enemy, governmental restrictions, laws or regulations or any other
causes beyond Consultant's and City's reasonable control, an extension of the Project schedule in an amount
equal to the time lost due to such delay shall be Consultant's sole and exclusive remedy. The revised schedule
should be approved in writing with a documented reason for granting the extension.
11.2 The City agrees that the Consultant is not responsible for damages arising from any cause beyond
Consultant's reasonable control.
11.3 If Consultant requests a remedy for a condition not specified above, Consultant must file a Claim as
provided in this Agreement.
ARTICLE XII — CLAIMS AND DISPUTE RESOLUTION
12.1 Filing of Claims
12.1.1 Claims arising from the circumstances identified in this Agreement or other occurrences or events,
Contract for Professional Services
Page 8 of 12
shall be made by Written Notice delivered by the party making the Claim to the other party within 21
calendar days after the start of the occurrence or event giving rise to the Claim and stating the general
nature of the Claim.
12.1.2 Every Claim of Consultant, whether for additional compensation, additional time or other relief,
shall be signed and sworn to by a person authorized to bind the Consultant by his/her signature, verifying
the truth and accuracy of the Claim.
12.1.3 The responsibility to substantiate a claim rests with the party making the Claim.
12.1.4 Within 30 calendar days of receipt of notice and supporting documentation, City will meet to
discuss the request, after which an offer of settlement or a notification of no settlement offer will be sent
to Consultant. If Consultant is not satisfied with the proposal presented, Consultant will have 30 calendar
days in which to (i) submit additional supporting data requested by the City, (ii) modify the initial request
for remedy or (iii) request Mediation.
12.1.5 Pending final resolution of a claim, except as otherwise agreed in writing, Consultant shall
proceed diligently with performance of the Agreement, and City shall continue to make payments in
accordance with this Agreement.
12.2 Mediation
12.2.1 All negotiations pursuant to this clause are confidential and shall be treated as compromise and
settlement negotiations for purposes of applicable rules of evidence.
12.2.2 Before invoking mediation, the Parties agree that they shall first try to resolve any dispute arising
out of or related to this Agreement through discussions directly between those senior management
representatives within their respective organizations who have overall managerial responsibility for
similar projects. This step shall be a condition precedent to the use of mediation. If the parties' senior
management representatives cannot resolve the dispute within 30 calendar days after a Party delivers a
written notice of such dispute,then the Parties shall proceed with the mediation process contained herein.
12.2.2.1 In the event that City or Consultant shall contend that the other has committed a material
breach of this Agreement, the Party alleging such breach shall, as a condition precedent
to filing any lawsuit, request mediation of the dispute.
12.2.2.2 Request for mediation shall be in writing, and shall request that the mediation commence
no less than 30 or more than 90 calendar days following the date of the request, except
upon agreement of both parties.
12.2.2.3 In the event City and Consultant are unable to agree to a date for the mediation or to
the identity of the mediator or mediators within 30 calendar days of the request for
mediation, all conditions precedent in this Article shall be deemed to have occurred.
12.2.2.4 The parties shall share the mediator's fee. Venue for mediation shall be Nueces County,
Texas. Any agreement reached in mediation shall be enforceable as a settlement
agreement in any court having jurisdiction thereof. No provision of this Agreement shall
waive any immunity or defense. No provision of this Agreement is a consent to suit.
12.3 In calculating the amount of any Claim or any measure of damages for breach of contract, the following
standards shall apply both to claims by Consultant and to claims by City:
Contract for Professional Services
Page 9 of 12
12.3.1 In no event shall either Party be liable, whether in contract or tort or otherwise, to the other Party
for loss of profits, delay damages or for any special incidental or consequential loss or damage of any
nature arising at any time or from any cause whatsoever;
12.3.2 Damages are limited to extra costs specifically shown to have been directly caused by a proven
wrong for which the other Party is claimed to be responsible.
12.4 In case of litigation between the parties, Consultant and City agree that neither party shall be responsible
for payment of attorney's fees pursuant to any law or other provision for payment of attorneys'fees. Both Parties
expressly waive any claim to attorney's fees should litigation result from any dispute between the parties to this
Agreement.
12.5 In case of litigation between the parties, Consultant and City agree that they have knowingly waived and
do hereby waive the right to trial by jury and have instead agreed, in the event of any litigation arising out of or
connected to this Agreement, to proceed with a trial before the court, unless both parties subsequently agree
otherwise in writing.
12.6 No Waiver of Governmental Immunity. This Agreement is to perform a governmental function
solely for the public benefit. Nothing in this Agreement shall be construed to waive City's
governmental immunity from lawsuit, which immunity is expressly retained to the extent it is
not clearly and unambiguously waived by state law.
ARTICLE XIII — MISCELLANEOUS PROVISIONS
13.1 Assignability. Neither party will assign, transfer or delegate any of its obligations or duties under this
Agreement contract to any other person and/or party without the prior written consent of the other party, except
for routine duties delegated to personnel of the Consultant staff. This includes subcontracts entered into for
services under this Agreement. If the Consultant is a partnership or joint venture, then in the event of the
termination of the partnership or joint venture, this contract will inure to the individual benefit of such partner or
partners as the City may designate. No part of the Consultant fee may be assigned in advance of receipt by the
Consultant without written consent of the City.
The City will not pay the fees of expert or technical assistance and consultants unless such employment,
including the rate of compensation, has been approved in writing by the City.
13.2 Provisions Required by Law. Each applicable provision and clause required by law to be inserted into
the Agreement shall be deemed to be enacted herein, and the Agreement shall be read and enforced as though
each were physically included herein.
13.3 Public Information. The requirements of Subchapter J, Chapter 552, Government Code, may apply to
this contract and the Consultant agrees that the contract can be terminated if the Consultant knowingly or
intentionally fails to comply with a requirement of that subchapter.
13.4 Standard of Care. Services provided by Consultant under this Agreement shall be performed with the
professional skill and care ordinarily provided by competent licensed professionals practicing under the same or
similar circumstances and professional license; and performed as expeditiously as is prudent considering the
ordinary professional skill and care of a competent engineer or architect.
13.5 Licensing. Consultant shall be represented by personnel with appropriate licensure, registration and/or
certification(s) at meetings of any official nature concerning the Project, including scope meetings, review
meetings, pre-bid meetings and preconstruction meetings.
Contract for Professional Services
Page 10 of 12
13.6 Independent Contractor. The relationship between the City and Consultant under this Agreement shall
be that of independent contractor. City may explain to Consultant the City's goals and objectives in regard to
the services to be performed by Consultant, but the City shall not direct Consultant on how or in what manner
these goals and objectives are to be met.
13.7 Entire Agreement. This Agreement represents the entire and integrated Agreement between City and
Consultant and supersedes all prior negotiations, representations or agreements, either oral or written. This
Agreement may be amended only by written instrument signed by both the City and Consultant.
13.8 No Third Party Beneficiaries. Nothing in this Agreement can be construed to create rights in any entity
other than the City and Consultant. Neither the City nor Consultant intends to create third party beneficiaries by
entering into this Agreement.
13.9 Disclosure of Interest. Consultant agrees to comply with City of Corpus Christi Ordinance No. 17112 and
complete the Disclosure of Interests form.
13.10 Certificate of Interested Parties. For contracts greater than $50,000, Consultant agrees to comply with
Texas Government Code section 2252.908 and complete Form 1295 Certificate of Interested Parties as part of
this agreement. Form 1295 must be electronically filed with the Texas Ethics Commission at
https://Prd.tecprd.ethicsefile.com/TECCertint/pages/login/certLogin.isf. The form must then be printed,
signed and filed with the City. For more information, please review the Texas Ethics Commission Rules at
httRs://www.ethics.state.tx.us/filinginfo/I 295/.
13.11 Conflict of Interest. Consultant agrees, in compliance with Chapter 176 of the Texas Local Government
Code, to complete and file Form CIQ with the City Secretary's Office. For more information and to determine if
you need to file a Form CIQ, please review the information on the City Secretary's website at
http://www.cctexas.com/government/city-secretary/confl ict-disclosure/index.
13.11 Title VI Assurance. The Consultant shall prohibit discrimination in employment based upon race, color,
religion, national origin, gender, disability or age.
13.12 Controlling Law. This Agreement is governed by the laws of the State of Texas without regard to its
conflicts of laws. Venue for legal proceedings lies exclusively in Nueces County, Texas. Cases must be filed
and tried in Nueces County and cannot be removed from Nueces County.
13.13 Severability. If, for any reason, any one or more Articles and/or paragraphs of this Agreement are held
invalid or unenforceable, such invalidity or unenforceability shall not affect, impair or invalidate the remaining
Articles and/or paragraphs of this Agreement but shall be confined in its effect to the specific Article, sentences,
clauses or parts of this Agreement held invalid or unenforceable, and the invalidity or unenforceability of any
Article, sentence, clause or parts of this Agreement, in any one or more instance, shall not affect or prejudice in
any way the validity of this Agreement in any other instance.
13.14 Conflict Resolution Between Documents. Consultant hereby agrees and acknowledges if anything
contained in the Consultant-prepared Exhibit A, Consultant's Scope of Services, the Consultant's response to
the Request for Qualifications related to this project, or in any other document prepared by Consultant and
included herein, is in conflict with Articles I-XIII of this Agreement (Articles), the Articles shall take precedence
and control to resolve said conflict.
13.15 Consultant verifies that it does not boycott Israel and will not boycott Israel during the term of this
Agreement; does not have a practice, policy, guidance or directive that discriminates against a firearm entity or
firearm trade association and will not discriminate against a firearm entity or firearm trade association during the
term of this Agreement; and does not boycott energy companies and will not boycott energy companies during
the term of this Agreement.
Contract for Professional Services
Page 11 of 12
CITY OF CORPUS CHRISTI Hanson Professional Services
01/08/2025 01/08/2025
Jefftinirndfs,T.ff. Date 5h6fby 9 an o, E Date
Director of Engineering Services Senior Vice President
4501 Gollihar Rd.
Corpus Christi, Texas 78411
(361) 814-9900 - Office
sswango@hanson-inc.com
APPROVED AS TO LEGAL FORM:
5R� 01/08/2025
Assrrstant City Attorney Date M2024-189
Authorized By
Council 12/10/2024
ATTEST
01/10/2025
City Secretary Date
Contract for Professional Services
Page 12 of 12
HANSON
HANSON-INC.COM Corpus Christi,TX,78411
ALLIEDENGINEERING I PLANNING I SERVICES
November 11, 2024
Mr. Jeff Edmonds, P.E.
Director of Engineering Services
City of Corpus Christi
PO Box 9277
Corpus Christi, TX 78469-9277
RE: City of Corpus Christi
24133 — North Padre Island Seawall
New Agreement for Permitting, Design and Construction Phases
Dear Mr. Edmonds,
We are pleased to present this proposal for providing civil engineering services in connection
with the above referenced project. As discussed, Hanson Professional Services Inc. is
requesting that a new agreement be issued to move forward with the permitting, design and
construction phase services while continuing the public coordination and project management.
The preliminary work has already been completed through task order 13 under MSA 4847.
Attachment A summarizes the proposed scope of work to be included through this agreement.
Listed below are all the phases anticipated to completed for the entire duration of the project.
The work to be addressed through this agreement are described herein.
Basic Services:
Task 101 — Project Management and Meetings (Continue — see scope of work)
Task 102 — Condition Assessment (Previously Completed)
Task 103 — Preliminary Design (30%) and Report (Finalize — see scope of work)
Task 104 — Design Phase (90%, 100%, Final S&S)
Task 105 — Bid Support
Task 106 — Construction Administration
Additional Services:
Task 201 — Geotechnical Engineering (Ground Penetrating Radar) (Previously
Completed)
Task 202 — Surveying —Topographic and Boundary (Finalize — see scope of work)
Task 203 — Environmental Services (Finalize— see scope of work)
Task 204 — Registered Accessibility Specialist Review / TDLR Permitting
We propose to complete the work through a Professional Service Agreement for a fee of
$1,181,870.00. Attached is the proposed summary of fees as well as the proposed project
schedule.
Sincerely,
HANSOOFESSIONAL SERVICES INC.
aild.zlra, Jr. PE
Vice President/ Project Principal
Exhibit A
North Padres Island Seawall City of Corpus Christi
November 11, 2024 Permitting, Design, and Construction Phase Services
ATTACHMENT—A
SCOPE OF WORK
24133 — NORTH PADRE ISLAND SEAWALL
OVERVIEW
The North Padre Island Seawall is a 4,200 LF wall originally constructed by a private group of
stakeholders in 1968. The seawall is showing surficial cracking and spalling, exposing the steel
reinforcement in some areas. In 2023 the City of Corpus Christi allocated funding through a
local Tax Increment Reinvestment Zone #2 to repair/rehabilitate the seawall. The City is working
on agreements with the Landowners to take over the maintenance of the seawall. Hanson
recently provided the City with a set of Preliminary Design Construction Drawings, a Preliminary
Engineering Report, and a Plan for Permitting. The proposed improvements to the seawall
include providing a new concrete cap over the entire wall section and promenade. In addition,
new amenities are planned to include shade structures, new LED pedestrian lighting, and water
and electrical service. ADA accessible routes from the top of the promenade down to the beach
will be incorporated at approved intervals along the length of the wall.
BASIC SERVICES
Task 101 — Project Management and Meetings (Continue—see scope of work)
Task 102— Condition Assessment (Previously Completed)
Task 103— Preliminary Design (30%) and Report (Finalize—see scope of work)
Task 104— Design Phase (90%, 100%, Final S&S)
Task 105— Bid Support
Task 106— Construction Administration
Task 101 - Project Management and Meetings
Consultant will continue regular communication throughout the project with the City,
Stakeholders, and Landowners through teleconference calls, online conferencing, or in
person meetings as detailed below for coordination and progress updates. The following
meetings are required to accomplish the various tasks outlined in the scope associated
with this MSA.
Project Team Coordination meetings — Consultant will participate in monthly
progress meetings with the City's Project Manager at the City Offices to review
progress, discuss data needs, and other topics of special concern. A maximum of two
(2) hours is anticipated for each meeting. These meetings will primarily be
teleconferencing calls. Consultant will prepare summary notes from each meeting and
submit them to the City's Project Manager for review and approval.
Stakeholder Meetings and Public Coordination— Consultant will participate in
regular update meetings with various stakeholders (City's Island Strategic Action
Committee, County's Beach Management Advisory Committee, City Council, City
Parks and Recreation Advisory Committee, etc.) to allow stakeholder input on the
amenities and keep the stakeholders updated on the design and construction
progress. It estimated that ten (10) such meetings will be required throughout the
design, permitting and construction phases. Additionally, due to the high usage and
public aspect of the project site, the Consultant will work with the City and
Stakeholders to update on-line and social media messaging about the project,
limitations of access during construction, and updates on progress.
Exhibit A
/ <0, !HANSON
North Padres Island Seawall City of Corpus Christi
November 11, 2024 Permitting, Design, and Construction Phase Services
Landowner Meetings —Consultant will participate in individual and group meeting
with adjacent landowners to review progress, discuss design, and any topics of special
concern. As noted, the seawall is currently within privately owned lands necessitating a
concerted effort with the adjacent landowners to develop the cohesion required to
complete this project. It is anticipated that the design and construction phases will
consist of no more than eight (8) meetings.
Deliverables: Monthly Updates — Consultant will deliver monthly updates to the City
identifying the progress, updated schedule, and budget, notify the City of project
needs, and identify future actions.
Task 102 —Condition Assessment (Previously Completed)
Task 103— Preliminary Engineering Report
Consultant completed the Schematic Layout of Accessible Routes/Amenities, Conceptual
Design of Elements, and a draft Pre-Design Consideration Review and Report. Consultant also
submitted a draft PER and was provided comments. This task is to address the PER
comments, finalize the Permitting Approach, and provide the City with a complete PER and 30%
Construction Drawings with OPCC.
• Deliverables: 30% Construction Drawings - Consultant will deliver a full set of
30% CDs.
• Preliminary Opinion of Probable Construction Cost - Consultant will work with
recent bid tabulations to evaluate the costs and prepare a preliminary OPCC.
• Preliminary Engineering Report— Consultant will address City comments and
finalize the PER, incorporating the 30% CDs and Preliminary OPCC.
Task 104— Design Phase (90%, 100%, Final SM
Once the City approves the recommendations and the scope of work identified in the PER, the
consultant will commence the design phase. The subsequent submittals within the Design
Phase scope include a 90%, 100%, and Final S&S submittal. These submittals will include
submittal checklists, OPCCs, front end documents, technical specifications, project summaries,
bid forms and construction plans with prior review comment resolutions.
90% Construction Plans - Building upon the 30% plans, Consultant will proceed to detailed
design development of the project. This will include finalizing structural repair details and
limits, cross sections of the overall seawall and proposed cap/repair, utility service
connections, accessible route improvements, details of amenities and other incorporated
design elements. Additionally, the construction sequence will be incorporated into the
project plans, and the OPCC and constructability reports will be updated. The 90% plans will
be submitted to the City for review and comment. Based on the City's feedback, the plans
will be updated and will proceed to 100% plan submittal.
100% Construction Plans - The 100% design will be revised based on comments received
from the 90% review meeting and will incorporate all comments from the City, regulatory
agencies, and project team QA/QC professionals. All design aspects will be finalized
including structural repair details, grading, utility extensions, environmental impact
avoidance features, required site access and control, final amenity details, and other design
Exhibit A
I1Zt911 HANSON
North Padres Island Seawall City of Corpus Christi
November 11, 2024 Permitting, Design, and Construction Phase Services
elements included in the project. The construction sequence and special provisions will be
finalized and incorporated into the project plans, and the OPCC and constructability reports
will be completed.
Final S&S Plans —The 100% plan set will be reviewed with the City's PM. A final signed
and sealed set will be issued for bidding purposes.
Task 105— Bid Phase
The consultant will provide documents to the City that will be used during the bidding process.
The Consultant will participate in the pre-bid conference to discuss scope of work and to
answer scope questions. After the pre-bid conference, the Consultant will review questions
concerning the bid documents and prepare revisions to the plans, specifications and bid forms.
The Consultant will attend the bid opening and assist with the evaluation of bids and review of
the Contractor's Statement of Experience and confirm it meets Contract requirements. For bids
over budget, the A/E will confer with City staff and provide revisions to the bid documents as the
City staff deems necessary to re-advertise the Project for bids. Additionally, the Consultant will
provide the City with conformed contract documents which include the construction drawings,
front end documents and technical specifications.
Task 106—Construction Administration
The Consultant will perform construction administration to include the following:
• Participate in the pre-construction meeting and provide the City PM with a list of critical
construction activities and elements impacting the project.
• Review Contractor submittals and operating and maintenance manuals for conformance
to contract documents.
• Provide interpretations and clarifications of the contract documents for Contractor
provided RFI's and authorize required changes, which do not affect the Contractor's
price and are not contrary to the general interest of the City under the Contract.
• Make periodic (four hours per week for 12 months) visits to the site of the Project to
confer with the City Project Inspector and Contractor to observe the general progress
and quality of work, and to determine, in general, if the work is being done in accordance
with the contract documents. This will not be confused with the Construction Observation
Services or continuous monitoring of the progress of construction.
• Attend weekly coordination meetings with the Contractor and City's Project Inspector to
monitor progress and address general questions.
• Attend final inspection with City staff, provide punch list items to the City's Construction
Engineers for Contractor completion, and provide the City with a Certificate of
Completion for the Project upon successful completion of the Project.
• Review Contractor-provided construction "red-line" drawings. Prepare Project Record
Drawings and provide a reproducible set and electronic file. The Record Drawings
should incorporate the Contractor's red lines and identify all changes made during
construction. The Drawing Cover and each sheet should be clearly identified as the
Record Drawing and should indicate the basis and date.
Exhibit A
W/ <0- !HANSON
North Padres Island Seawall City of Corpus Christi
November 11, 2024 Permitting, Design, and Construction Phase Services
ADDITIONAL SERVICES
Task 201 —Geotechnical Engineering (Ground Penetrating Radar) (Completed)
Task 202 —Surveying —Topographic and Boundary (Finalize—see scope of work)
Task 203 — Environmental Services (Finalize—see scope of work)
Task 204 — Registered Accessibility Specialist Review/TDLR Permitting
Task 201 —Geotechnical Engineering (Completed)
Task 202 —Surveying
Consultant will provide surveying to support the permitting efforts. Field Staff will establish and
set project controls to support the final design and permitting phases.
Task 203 — Environmental Services
Contact key agencies to discuss scenarios that require permitting and timelines for such a
process. Explain that this is intended to be maintenance on an existing facility and not the
construction of a new facility.Additional basic items to be considered and agencies to be
contacted.
1. Construction Methods Alternative Analysis
2. Coordination with TxGLO
3. JEM Meetings with USACE / USFWS
4. USACE Permit (TBD)
5. Pre-application meeting with the TxGLO
6. Coordination Meeting with Nueces County BMAC (DPP)
7. TxGLO/Nueces County BMAC — Dune Protection Permit
8. Coordination with City of Corpus Christi Planning Commission (BCC)
9. City of CC/TxGLO - Beachfront Construction Certificate
Task 204— Registered Accessibility Specialist Review/TDLR Permitting
Consultant will sub-contract with a Registered Accessibility Specialist (RAS) to consult on
accessible routes and other design elements during the preliminary design and final design
phases and provide a final review prior to completing the design phase. The RAS will register
the project with the Texas Department of Licensing and Regulation (TDLR) per the TDLR
requirements. The RAS will provide a completion survey and assessment and file closeout
documentation with TDLR once the project is complete.
Exhibit A
/ <0- !HANSON
North Padres Island Seawall City of Corpus Christi
November 11, 2024 Permitting, Design, and Construction Phase Services
SUMMARY OF FEES
MSA 4847
Project Name: North Padre Island Seawall Repair Project
Project No.: 24133
Project Limits:
Consultant: Hanson Professional Services Inc.
Project Summary of Fees
Basic Services
I.D. Task Description Fee Subtotals
A 101 Project Management and Meetings $ 135,386.00
A 102 Condition Assessment $ -
A 103 Preliminary Design (30%)and Report $ 13,306.00
A 104 Design Phase $ 495,109.00
A 105 Bid Phase $ 34,582.00
A 106 Construction Administration $ 273,788.00
Basic Services $ 952,171.00
Additional Services
B 201 Geotechnical Engineering $ -
B 202 Survey $ 25,008.00
B 203 Environmental Services $ 201,604.00
B 204 Registered Accessibility Specialist Review/TDLR Registration $ 3,087.00
Additional Services $ 229,699.00
A Basic Services Fee Total $ 952,171.00
B Additional Services Fee Total $ 229,699.00
$ 1,181,870.00
Exhibit A
I <t HANSON
North Padres Island Seawall City of Corpus Christi
November 11, 2024 Permitting, Design, and Construction Phase Services
SCHEDULE
Project Schedule
North Padre Island Seawall
Completion Date Activity
Wednesday, May 3, 2024 Notice to Proceed
Wednesday, September 4, 2024 30% design Submittal
Wednesday, September 4, 2024 Preliminary Engineering Report PER Submittal
Monday, September 16, 2024 City 30% Design and PER Review Comments Provided
Wednesday, December 4, 2024 Phase 2 Notice to Proceed*
Friday, March 14, 2025 90% Plan Submittal
Friday, March 28, 2025 City 90% Plan Review Comments Provided
Wednesday, April 30, 2025 100% Plan Submittal
Wednesday, May 14, 2025 City 100% Plan Review Comments Provided
Wednesday, May 28, 2025 Final Sealed Bid Package
Ma , 2025 Advertise For Bids
June, 2025 Pre-bid Conference
July, 2025 Receive Bids
July, 2025 Contract Award
August, 2025 Begin Construction
July, 2026 Complete Construction
August, 2026 Final Inspections
*Schedule subject to change dependent on Phase 2 Notice to Proceed date.
Exhibit A
/ lztq"HANSON
0 0 0 0 0 0 0 0 0 0 0 0
L O O CD CD In O O O CO m m Ln CO Ln r
p a) L V Q 00 0 0 0 0 N O O ~ ~ ~ O O O N
E c C O i E
CV r
o pC U o d U
w -0
Q- a) Q 0 0 0 0 0 0 0 00 ❑ ❑ 0 0 0 0 J
E E O O O O O O O O op m m O o 0 o a
co m T y 0 0 0 0 0 0 0 � r` CD r- r
a. of E V on, O Ln O Ln O N N Ln � O
a M r- M r- Ln r CO N r- N O O
r61a M Ln r r r Ln V G V
0 m Qa H} H} on, E!) 64 6s to b4 {f} O
W
0 0 0 0 0 0 00 ❑ ❑ ❑ 00 0 0
p o 0 0 0 0 O O o m m m 0 0 0 0 J
t� O O O O O 0 0 0 0 0 0 0
C 00 0 Ef} Ef3 O O K> Ef} O 0 0 0
0
H > = N E� 64 CV 69 CM
LL
= 619- Ef} H} 69, H} V
Z
O O O O O O O O ❑ ❑ ❑ O 0 0 0 LLB
N 0 0 0 0 0 O O O m m m 0 0 0 0
M p 0 0 0 0 0 0 0 0 F- F- 0 0 0 0 Z
O .v O O C!> Efl O C!> K? E!> 69- O 64 0 O
O O Ln Ln Ln Ln
Q1 > rQ� r r r a
a` � 6s � � W
0 0 0 0 O O O o ❑ ❑ ❑ O O O 0
o 0 0 0 0 0 0 0 m m m o 0 0 CD V
o 0 0 0 0 0 0 0 F- o 0 0 0
w 1- o 0 0 Lon 0 LOn Lon_ V
r r 09 ea r r
6s 6q 61), 0 CO
F-
� N Z
V N O O O O O O O O Q Q Q co O O O 0
W Clv o 0 0 0 0 0 0 o m m m o 0 0 o Z a
o 0 0 0 0 0 0 l-- I- o r- ti Q
O O O O 0 0 O O O O N N Iq Ln I O y m
OC Z Z p a 0 0 I'- O N O r O r- N ti M W CU r
p r M M ao N ao N (� co
C1 EA EA 6F} 6f} 6f} fA 69 EA E f} ER
O Q u O O
J O C V N O O O O O O O O ❑ ❑ ❑ CD 0 0 0 Z CU
IL a p o 0 0 00 0 0 o m co co o 0 0 0 m 3 LU
> O o o 0 0 0 0 0 ♦- ♦- ♦- ti O ►) d
Z H> Efl O 6q � N NN ~ Q QNON � (O oo a
v E � 6s 6> � > 0> Nam- Z a .c
Q QT o
r 0 0 0 0 0 0 0 0 ❑ 00 0 0 0 0 W cri M
0 0 0 0 0 0 0 o m m m o 0 0 o W
C O o 0 0 0 0 0 0 0 0 0 o O V
Zuq� oU9, v!) o 61.� r61) � o N N V o
Qd> rr Z Z o
W W c
0 0 0 0 0 0 0 0 ❑ ❑ ❑ o 0 0 o Op O o E
O O O CD0 0 00 op M co o 0 0 0 1
M o 0 0 0 0 0 0 0 � � o 0 0 o ( o
0 0 LO Lon 0 0 ` `�' 0 0 0 0 Z) �
v � N� 6s " N1- � o� 69- ta °
CT
m a o
U) w ri W W .c w
C: y li O ?
ayi d U) �, ° ri (D W �► a
_� a M a M _0 o c) � � _
a) Z- m M o d c ) Co Q U- = Q
fn d m io C c ° 0) Q io p V
Vl s= 'a L C2 — Q E .� +�+ J CU 4
m 0- ❑ m 0 cn Q a ws am: O cUn in in CO Q H Z Q
EXHIBIT C
Insurance Requirements
Pre-Design, Design and General Consulting Contracts
1.1 Consultant must not commence work under this agreement until all required
insurance has been obtained and such insurance has been approved by the City.
Consultant must not allow any subcontractor to commence work until all similar
insurance required of any subcontractor has been obtained.
1.2 Consultant must furnish to the Director of Engineering Services with the signed
agreement a copy of Certificates of Insurance (COI) with applicable policy
endorsements showing the following minimum coverage by an insurance company(s)
acceptable to the City's Risk Manager. A waiver of subrogation is required on all
applicable policies. Endorsements must be provided with COI. Project name and
or number must be listed in Description Box of COI.
TYPE OF INSURANCE MINIMUM INSURANCE COVERAGE
30-written day notice of cancellation, Bodily Injury and Property Damage
required on all certificates or by Per occurrence - aggregate
applicable policy endorsements
PROFESSIONAL LIABILITY $1,000,000 Per Claim
(Errors and Omissions)
If claims made policy, retro date must
be prior to inception of agreement,
have 3-year reporting period provisions
or be maintained for 3 years after
project completion.
1.3 In the event of accidents of any kind related to this agreement, Consultant must
furnish the City with copies of all reports of any accidents within 10 days of the accident.
1.4 Consultant shall obtain and maintain in full force and effect for the duration of this
Contract, and any extension hereof, at Consultant's sole expense, insurance coverage
written on an occurrence basis, with the exception of professional liability, which may be
on a per claims made basis, by companies authorized and admitted to do business in
the State of Texas and with an A.M. Best's rating of no less than A- VII. Consultant is
required to provide City with renewal Certificates.
1 Rev 12/20
1.5 Consultant is required to submit a copy of the replacement certificate of
insurance to City at the address provided below within 10 days of the requested
change. Consultant shall pay any costs incurred resulting from said changes. All notices
under this Article shall be given to City at the following address:
City of Corpus Christi
Attn: Engineering Services
P.O. Box 9277
Corpus Christi, TX 78469-9277
1.6 Consultant agrees that with respect to the above required insurance, all
insurance policies are to contain or be endorsed to contain the following required
provisions:
1.6.1 Provide thirty (30) calendar days advance written notice directly to City of
any suspension, cancellation or non-renewal of coverage, and not less
than ten (10) calendar days advance written notice for nonpayment of
premium.
1.7 Within five (5) calendar days of a suspension, cancellation or non-renewal of
coverage, Consultant shall provide a replacement Certificate of Insurance and
applicable endorsements to City. City shall have the option to suspend Consultant's
performance should there be a lapse in coverage at any time during this contract.
Failure to provide and to maintain the required insurance shall constitute a material
breach of this contract.
1.8 In addition to any other remedies the City may have upon Consultant's failure to
provide and maintain any insurance or policy endorsements to the extent and within the
time herein required, the City shall have the right to order Consultant to remove the
exhibit hereunder, and/or withhold any payment(s) if any, which become due to
Consultant hereunder until Consultant demonstrates compliance with the requirements
hereof.
1.9 Nothing herein contained shall be construed as limiting in any way the extent to
which Consultant may be held responsible for payments of damages to persons or
property resulting from Consultant's or its subcontractor's performance of the work
covered under this agreement.
1.10 It is agreed that Consultant's insurance shall be deemed primary and non-
contributory with respect to any insurance or self-insurance carried by the City of
Corpus Christi for liability arising out of operations under this agreement.
1.11 It is understood and agreed that the insurance required is in addition to and
separate from any other obligation contained in this agreement.
2 Rev 12/20
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to
design services
Table of Contents
Page
Article 1—Definitions and Terminology .......................................................................................................2
Article2—Preliminary Matters.....................................................................................................................8
Article 3—Contract Documents: Intent, Requirements, Reuse...................................................................8
Article 4—Commencement and Progress of the Work................................................................................9
Article 5—Availability of Lands; Subsurface, Physical and Hazardous Environmental Conditions ..............9
Article 6—Bonds and Insurance .................................................................................................................10
Article 7—Contractor's Responsibilities.....................................................................................................10
Article 8—Other Work at the Site...............................................................................................................10
Article 9—Owner's and OPT's Responsibilities...........................................................................................10
Article 10—OAR'S and Designer's Status During Construction ..................................................................11
Article 11—Amending the Contract Documents; Changes in the Work ....................................................13
Article 12—Change Management ..............................................................................................................13
Article13—Claims.......................................................................................................................................14
Article 14—Prevailing Wage Rate Requirements.......................................................................................16
Article 15—Cost of the Work; Allowances; Unit Price Work......................................................................16
Article 16—Tests and Inspections; Correction, Removal, or Acceptance of Defective Work....................16
Article 17—Payments to Contractor; Set-Offs; Completion; Correction Period ........................................16
Article 18—Suspension of Work and Termination.....................................................................................16
Article 19—Project Management...............................................................................................................16
Article 20—Project Coordination................................................................................................................16
Article21—Quality Management...............................................................................................................17
Article 22— Final Resolution of Disputes....................................................................................................17
Article 23—Minority/MBE/DBE Participation Policy..................................................................................17
Article 24—Document Management..........................................................................................................17
Article25—Shop Drawings.........................................................................................................................17
Article26— Record Data.............................................................................................................................20
Article 27—Construction Progress Schedule..............................................................................................21
Article 28—Video and Photographic documentation ................................................................................21
Article 29— Execution and Closeout...........................................................................................................21
Article30—Miscellaneous..........................................................................................................................22
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Pagel of 22
ARTICLE 1—DEFINITIONS AND TERMINOLOGY
1.01 Defined Terms
A. Terms with initial capital letters, including the term's singular and plural forms, have the
meanings indicated in this paragraph wherever used in the Bidding Requirements or Contract
Documents. In addition to the terms specifically defined, terms with initial capital letters in
the Contract Documents may include references to identified articles and paragraphs, and
the titles of other documents or forms.
1. Addenda - Documents issued prior to the receipt of Bids which clarify or modify the
Bidding Requirements or the proposed Contract Documents.
2. Agreement - The document executed between Owner and Contractor covering the
Work.
3. Alternative Dispute Resolution -The process by which a disputed Claim may be settled
as an alternative to litigation, if Owner and Contractor cannot reach an agreement
between themselves.
4. Application for Payment - The forms used by Contractor to request payments from
Owner and the supporting documentation required by the Contract Documents.
5. Award Date—The date the City Council of the City of Corpus Christi (City)authorizes the
City Manager or designee to execute the Contract on behalf of the City.
6. Bid-The documents submitted by a Bidder to establish the proposed Contract Price and
Contract Times and provide other information and certifications as required by the
Bidding Requirements.
7. Bidding Documents - The Bidding Requirements, the proposed Contract Documents,
and Addenda.
8. Bidder-An individual or entity that submits a Bid to Owner.
9. Bidding Requirements-The Invitation for Bids, Instructions to Bidders, Bid Security, Bid
Form and attachments, and required certifications.
10. Bid Security-The financial security in the form of a bid bond provided by Bidder at the
time the Bid is submitted and held by Owner until the Agreement is executed and the
evidence of insurance and Bonds required by the Contract Documents are provided. A
cashier's check, certified check, money order or bank draft from any State or National
Bank will also be acceptable.
11. Bonds - Performance Bond, Payment Bond, Maintenance Bond, and other Surety
instruments executed by Surety. When in singular form, refers to individual instrument.
12. Change Order - A document issued on or after the Effective Date of the Contract and
signed by Owner and Contractor which modifies the Work, Contract Price, Contract
Times, or terms and conditions of the Contract.
13. Change Proposal - A document submitted by Contractor in accordance with the
requirements of the Contract Documents:
a. Requesting an adjustment in Contract Price or Contract Times;
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 2 of 22
b. Contesting an initial decision concerning the requirements of the Contract
Documents or the acceptability of Work under the Contract Documents;
c. Challenging a set-off against payment due; or
d. Seeking a Modification with respect to the terms of the Contract.
14. City Engineer-The Corpus Christi City Engineer and/or his designated representative as
identified at the preconstruction conference or in the Notice to Proceed.
15. Claim - A demand or assertion by Owner or Contractor submitted in accordance with
the requirements of the Contract Documents. A demand for money or services by an
entity other than the Owner or Contractor is not a Claim.
16. Constituent of Concern - Asbestos, petroleum, radioactive materials, polychlorinated
biphenyls (PCBs), hazardous wastes, and substances, products, wastes, or other
materials that are or become listed, regulated, or addressed pursuant to:
a. The Comprehensive Environmental Response, Compensation and Liability Act, 42
U.S.C. §§9601 et seq. ("CERCLA");
b. The Hazardous Materials Transportation Act, 49 U.S.C. §§5101 et seq.;
c. The Resource Conservation and Recovery Act,42 U.S.C. §§6901 et seq. ("RCRA");
d. The Toxic Substances Control Act, 15 U.S.C. §§2601 et seq.;
e. The Clean Water Act, 33 U.S.C. §§1251 et seq.;
f. The Clean Air Act, 42 U.S.C. §§7401 et seq.; or
g. Any other Laws or Regulations regulating, relating to, or imposing liability or
standards of conduct concerning hazardous,toxic, or dangerous waste, substance,
or material.
17. Contract -The entire integrated set of documents concerning the Work and describing
the relationship between the Owner and Contractor.
18. Contract Amendment-A document issued on or after the Effective Date of the Contract
and signed by Owner and Contractor which:
a. Authorizes new phases of the Work and establishes the Contract Price, Contract
Times, or terms and conditions of the Contract for the new phase of Work; or
b. Modifies the terms and conditions of the Contract, but does not make changes in
the Work.
19. Contract Documents - Those items designated as Contract Documents in the
Agreement.
20. Contract Price - The monetary amount stated in the Agreement and as adjusted by
Modifications,and increases or decreases in unit price quantities, if any,that Owner has
agreed to pay Contractor for completion of the Work in accordance with the Contract
Documents.
21. Contract Times-The number of days or the dates by which Contractor must:
a. Achieve specified Milestones;
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 3 of 22
b. Achieve Substantial Completion; and
c. Complete the Work.
22. Contractor-The individual or entity with which Owner has contracted for performance
of the Work.
23. Contractor's Team - Contractor and Subcontractors, Suppliers, individuals, or entities
directly or indirectly employed or retained by them to perform part of the Work or
anyone for whose acts they may be liable.
24. Cost of the Work -The sum of costs incurred for the proper performance of the Work
as allowed by Article 15.
25. Defective - When applied to Work, refers to Work that is unsatisfactory, faulty, or
deficient in that it:
a. Does not conform to the Contract Documents;
b. Does not meet the requirements of applicable inspections, reference standards,
tests, or approvals referred to in the Contract Documents; or
C. Has been damaged or stolen prior to OAR's recommendation of final payment
unless responsibility for the protection of the Work has been assumed by Owner
at Substantial Completion in accordance with Paragraphs 17.12 or 17.13.
26. Designer - The individuals or entity named as Designer in the Agreement and the
subconsultants, individuals, or entities directly or indirectly employed or retained by
Designer to provide design or other technical services to the Owner. Designer has
responsibility for engineering or architectural design and technical issues related to the
Contract Documents. Designers are Licensed Professional Engineers, Registered
Architects or Registered Landscape Architects qualified to practice their profession in
the State of Texas.
27. Drawings - The part of the Contract that graphically shows the scope, extent, and
character of the Work. Shop Drawings and other Contractor documents are not
Drawings.
28. Effective Date of the Contract-The date indicated in the Agreement on which the City
Manager or designee has signed the Contract.
29. Field Order-A document issued by OAR or Designer requiring changes in the Work that
do not change the Contract Price or the Contract Times.
30. Hazardous Environmental Condition - The presence of Constituents of Concern at the
Site in quantities or circumstances that may present a danger to persons or property
exposed to Constituents of Concern. The presence of Constituents of Concern at the
Site necessary for the execution of the Work or to be incorporated in the Work is not a
Hazardous Environmental Condition provided these Constituents of Concern are
controlled and contained pursuant to industry practices, Laws and Regulations, and the
requirements of the Contract.
31. Indemnified Costs-All costs, losses,damages,and legal or other dispute resolution costs
resulting from claims or demands against Owner's Indemnitees. These costs include
fees for engineers, architects, attorneys, and other professionals.
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 4 of 22
32. Laws and Regulations; Laws or Regulations-Applicable laws,statutes,rules,regulations,
ordinances,codes,and orders of governmental bodies,agencies,authorities,and courts
having jurisdiction over the Project.
33. Liens - Charges, security interests, or encumbrances upon Contract related funds, real
property, or personal property.
34. Milestone-A principal event in the performance of the Work that Contractor is required
by Contract to complete by a specified date or within a specified period of time.
35. Modification - Change made to the Contract Documents by one of the following
methods:
a. Contract Amendment;
b. Change Order;
C. Field Order; or
d. Work Change Directive.
36. Notice of Award-The notice of Owner's intent to enter into a contract with the Selected
Bidder.
37. Notice to Proceed - A notice to Contractor of the Contract Times and the date Work is
to begin.
38. Owner-The City of Corpus Christi (City), a Texas home-rule municipal corporation and
political subdivision organized under the laws of the State of Texas, acting by and
through its duly authorized City Manager and his designee, the City Engineer (the
Director of Engineering Services), and the City's officers, employees, agents, or
representatives, authorized to administer design and construction of the Project.
39. Owner's Authorized Representative or OAR -The individual or entity named as OAR in
the Agreement and the consultants, subconsultants, individuals, or entities directly or
indirectly employed or retained by them to provide construction management services
to the Owner. The OAR may be an employee of the Owner.
40. Owner's Indemnitees- Each member of the OPT and their officers, directors, members,
partners, employees, agents, consultants, and subcontractors.
41. Owner's Project Team or OPT - The Owner, Owner's Authorized Representative,
Resident Project Representative, Designer, and the consultants, subconsultants,
individuals, or entities directly or indirectly employed or retained by them to provide
services to the Owner.
42. Partial Occupancy or Use- Use by Owner of a substantially completed part of the Work
for the purpose for which it is intended (or a related purpose) prior to Substantial
Completion of all the Work.
43. Progress Schedule -A schedule prepared and maintained by Contractor, describing the
sequence and duration of the activities comprising the Contractor's plan to accomplish
the Work within the Contract Times. The Progress Schedule must be a Critical Path
Method (CPM) Schedule.
44. Project - The total undertaking to be accomplished for Owner under the Contract
Documents.
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 5 of 22
4S. Resident Project Representative or RPR-The authorized representative of OPT assigned
to assist OAR at the Site. As used herein, the term Resident Project Representative
includes assistants and field staff of the OAR.
46. Samples - Physical examples of materials, equipment, or workmanship representing
some portion of the Work that are used to establish the standards for that portion of
the Work.
47. Schedule of Documents-A schedule of required documents, prepared, and maintained
by Contractor.
48. Schedule of Values - A schedule, prepared and maintained by Contractor, allocating
portions of the Contract Price to various portions of the Work and used as the basis for
Contractor's Applications for Payment.
49. Selected Bidder-The Bidder to which Owner intends to award the Contract.
50. Shop Drawings - All drawings, diagrams, illustrations, schedules, and other data or
information that are specifically prepared or assembled and submitted by Contractor to
illustrate some portion of the Work. Shop Drawings,whether approved or not, are not
Drawings and are not Contract Documents.
51. Site - Lands or areas indicated in the Contract Documents as being furnished by Owner
upon which the Work is to be performed. The Site includes rights-of-way, easements,
and other lands furnished by Owner which are designated for use by the Contractor.
52. Specifications -The part of the Contract that describes the requirements for materials,
equipment, systems, standards, and workmanship as applied to the Work, and certain
administrative requirements and procedural matters applicable to the Work.
53. Subcontractor-An individual or entity having a direct contract with Contractor or with
other Subcontractors or Suppliers for the performance of a part of the Work.
54. Substantial Completion -The point where the Work or a specified part of the Work is
sufficiently complete to be used for its intended purpose in accordance with the
Contract Documents.
55. Supplementary Conditions -The part of the Contract that amends or supplements the
General Conditions.
56. Supplier - A manufacturer, fabricator, supplier, distributor, materialman, or vendor
having a direct contract with Contractor or with Subcontractors or other Suppliers to
furnish materials or equipment to be incorporated in the Work.
57. Technical Data-Those items expressly identified as Technical Data in the Supplementary
Conditions with respect to either:
a. Subsurface conditions at the Site;
b. Physical conditions relating to existing surface or subsurface structures at the Site,
except Underground Facilities; or
c. Hazardous Environmental Conditions at the Site.
58. Underground Facilities - All underground pipelines, conduits, ducts, cables, wires,
manholes, vaults, tanks, tunnels, other similar facilities or appurtenances, and
encasements containing these facilities which are used to convey electricity, gases,
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 6 of 22
steam, liquid petroleum products, telephone or other communications, fiber optic
transmissions, cable television, water, wastewater, storm water, other liquids or
chemicals, or traffic or other control systems.
59. Unit Price Work-Work to be paid for on the basis of unit prices.
60. Work - The construction of the Project or its component parts as required by the
Contract Documents.
61. Work Change Directive -A directive issued to Contractor on or after the Effective Date
of the Contract ordering an addition, deletion, or revision in the Work. The Work
Change Directive serves as a memorandum of understanding regarding the directive
until a Change Order can be issued.
1.02 Terminology
A. The words and terms discussed in this Paragraph 1.02 are not defined, but when used in the
Bidding Requirements or Contract Documents, have the indicated meaning.
B. It is understood that the cost for performing Work is included in the Contract Price and no
additional compensation is to be paid by Owner unless specifically stated otherwise in the
Contract Documents. Expressions including or similar to "at no additional cost to Owner,"
"at Contractor's expense,"or similar words mean that the Contractor is to perform or provide
specified operation of Work without an increase in the Contract Price.
C. The terms"day"or"calendar day" mean a calendar day of 24 hours measured from midnight
to the next midnight.
D. The meaning and intent of certain terms or adjectives are described as follows:
1. The terms "as allowed," "as approved," "as ordered," "as directed," or similar terms in
the Contract Documents indicate an exercise of professional judgment by the OPT.
2. Adjectives including or similar to "reasonable," "suitable," "acceptable," "proper,"
"satisfactory," or similar adjectives are used to describe a determination of OPT
regarding the Work.
3. Any exercise of professional judgment by the OPT will be made solely to evaluate the
Work for general compliance with the Contract Documents unless there is a specific
statement in the Contract Documents indicating otherwise.
4. The use of these or similar terms or adjectives does not assign a duty or give OPT
authority to supervise or direct the performance of the Work, or assign a duty or give
authority to the OPT to undertake responsibilities contrary to the provisions of Articles
9 or 10 or other provisions of the Contract Documents.
E. The use of the words "furnish," "install," "perform," and "provide" have the following
meanings when used in connection with services, materials, or equipment:
1. Furnish means to supply and deliver the specified services, materials, or equipment to
the Site or other specified location ready for use or installation.
2. Install means to complete construction or assembly of the specified services, materials,
or equipment so they are ready for their intended use.
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 7 of 22
3. Perform or provide means to furnish and install specified services, materials, or
equipment, complete and ready for their intended use.
4. Perform or provide the specified services, materials, or equipment complete and ready
for intended use if the Contract Documents require specific services, materials, or
equipment, but do not expressly use the words "furnish," "install," "perform," or
"provide."
F. Contract Documents are written in modified brief style:
1. Requirements apply to all Work of the same kind, class, and type even though the word
"all" is not stated.
2. Simple imperative sentence structure is used which places a verb as the first word in the
sentence. It is understood that the words "furnish," "install," "perform," "provide," or
similar words include the meaning of the phrase "The Contractor shall..." before these
words.
3. Unless specifically stated that action is to be taken by the OPT or others, it is understood
that the action described is a requirement of the Contractor.
G. Words or phrases that have a well-known technical or construction industry or trade
meaning are used in the Contract Documents in accordance with this recognized meaning
unless stated otherwise in the Contract Documents.
H. Written documents are required where reference is made to notices, reports, approvals,
consents, documents, statements, instructions, opinions or other types of communications
required by the Contract Documents. Approval and consent documents must be received by
Contractor prior to the action or decision for which approval or consent is given. These may
be made in printed or electronic format through the OPT's project management information
system or other electronic media as required by the Contract Documents or approved by the
OAR.
I. Giving notice as required by the Contract Documents may be by printed or electronic media
using a method that requires acknowledgment of the receipt of that notice.
ARTICLE 2—PRELIMINARY MATTERS
ARTICLE 3—CONTRACT DOCUMENTS: INTENT, REQUIREMENTS, REUSE
3.01 Intent
B. Provide equipment that is functionally complete as described in the Contract Documents.
The Drawings and Specifications do not indicate or describe all of the Work required to
complete the installation of products purchased by the Owner or Contractor. Additional
details required for the correct installation of selected products are to be provided by the
Contractor and coordinated with the Designer through the OAR.
3.02 Reference Standards
Comply with applicable construction industry standards, whether referenced or not.
1. Standards referenced in the Contract Documents govern over standards not referenced
but recognized as applicable in the construction industry.
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 8 of 22
2. Comply with the requirements of the Contract Documents if they produce a higher
quality of Work than the applicable construction industry standards.
3. Designer determines whether a code or standard is applicable, which of several are
applicable, or if the Contract Documents produce a higher quality of Work.
3.03 Reporting and Resolving Discrepancies
3.04 Interpretation of the Contract Documents
Submit questions regarding the design of the Project described in the Contract Documents
to the OAR immediately after those questions arise. OAR is to request an interpretation of
the Contract Documents from the Designer. Designer is to respond to these questions by
providing an interpretation of the Contract Documents. OAR will coordinate the response of
the OPT to Contractor.
C. OPT may initiate a Modification to the Contract Documents through the OAR if a response to
the question indicates that a change in the Contract Documents is required. Contractor may
appeal Designer's or OAR's interpretation by submitting a Change Proposal.
ARTICLE 4—COMMENCEMENT AND PROGRESS OF THE WORK
ARTICLE 5—AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS
ENVIRONMENTAL CONDITIONS
5.01 Availability of Lands
5.02 Use of Site and Other Areas
5.03 Subsurface and Physical Conditions
5.04 Differing Subsurface or Physical Conditions
OAR is to notify the OPT after receiving notice of a differing subsurface or physical condition
from the Contractor. Designer is to:
1. Promptly review the subsurface or physical condition;
2. Determine the necessity of OPT's obtaining additional exploration or tests with respect
the subsurface or physical condition;
3. Determine if the subsurface or physical condition falls within one or more of the
differing Site condition categories in Paragraph 5.04.A;
4. Prepare recommendations to OPT regarding the Contractor's resumption of Work in
connection with the subsurface or physical condition in question;
5. Determine the need for changes in the Drawings or Specifications; and
6. Advise OPT of Designer's findings, conclusions, and recommendations.
C. OAR is to issue a statement to Contractor regarding the subsurface or physical condition in
question and recommend action as appropriate after review of Designer's findings,
conclusions, and recommendations.
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 9 of 22
5.05 Underground Facilities
The Designer is to take the following action after receiving notice from the OAR:
1. Promptly review the Underground Facility and conclude whether the Underground
Facility was not shown or indicated in the Contract Documents, or was not shown or
indicated with reasonable accuracy;
2. Prepare recommendations to OPT regarding the Contractor's resumption of Work in
connection with this Underground Facility;
3. Determine the extent to which a change is required in the Drawings or Specifications to
document the consequences of the existence or location of the Underground Facility;
and
4. Advise OAR of Designer's findings, conclusions, and recommendations and provide
revised Drawings and Specifications if required.
D. OAR is to issue a statement to Contractor regarding the Underground Facility in question and
recommend action as appropriate after review of Designer's findings, conclusions, and
recommendations.
ARTICLE 6—BONDS AND INSURANCE
ARTICLE 7—CONTRACTOR'S RESPONSIBILITIES
ARTICLE 8—OTHER WORK AT THE SITE
ARTICLE 9—OWNER'S AND OPT'S RESPONSIBILITIES
9.01 Communications to Contractor
A. OPT issues communications to Contractor through OAR except as otherwise provided in the
Contract Documents.
9.02 Replacement of Owner's Project Team Members
A. Owner may replace members of the OPT at its discretion.
9.03 Furnish Data
A. OPT is to furnish the data required of OPT under the Contract Documents.
9.04 Pay When Due
9.05 Lands and Easements; Reports and Tests
A. Owner's duties with respect to providing lands and easements are described in Paragraph
5.01. OPT will make copies of reports of explorations and tests of subsurface conditions and
drawings of physical conditions relating to existing surface or subsurface structures at the
Site available to Contractor in accordance with Paragraph 5.03.
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 10 of 22
9.06 Insurance
9.07 Modifications
9.08 Inspections,Tests, and Approvals
A. OPT's responsibility with respect to certain inspections,tests, and approvals are described in
Paragraph 16.02.
9.09 Limitations on OPT's Responsibilities
A. The OPT does not supervise, direct, or have control or authority over, and is not responsible
for Contractor's means, methods, techniques, sequences, or procedures of construction, or
related safety precautions and programs, or for failure of Contractor to comply with Laws
and Regulations applicable to the performance of the Work. OPT is not responsible for
Contractor's failure to perform the Work in accordance with the Contract Documents.
9.10 Undisclosed Hazardous Environmental Condition
A. OPT's responsibility for undisclosed Hazardous Environmental Conditions is described in
Paragraph 5.06.
9.11 Compliance with Safety Program
A. Contractor is to inform the OPT of its safety programs and OPT is to comply with the specific
applicable requirements of this program.
ARTICLE 10—OAR'S AND DESIGNER'S STATUS DURING CONSTRUCTION
10.01 Owner's Representative
A. OAR is Owner's representative. The duties and responsibilities and the limitations of
authority of OAR as Owner's representative are described in the Contract Documents.
10.02 Visits to Site
A. Designer is to make periodic visits to the Site to observe the progress and quality of the Work.
Designer is to determine, in general, if the Work is proceeding in accordance with the
Contract Documents based on observations made during these visits. Designer is not
required to make exhaustive or continuous inspections to check the quality or quantity of
the Work. Designer is to inform the OPT of issues or concerns and OAR is to work with
Contractor to address these issues or concerns. Designer's visits and observations are
subject to the limitations on Designer's authority and responsibility described in Paragraphs
9.09 and 10.07.
B. OAR is to observe the Work to check the quality and quantity of Work, implement Owner's
quality assurance program, and administer the Contract as Owner's representative as
described in the Contract Documents. OAR's visits and observations are subject to the
limitations on OAR's authority and responsibility described in Paragraphs 9.09 and 10.07.
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 11 of 22
10.03 Resident Project Representatives
A. Resident Project Representatives assist OAR in observing the progress and quality of the
Work at the Site. The limitations on Resident Project Representatives' authority and
responsibility are described in Paragraphs 9.09 and 10.07.
10.04 Rejecting Defective Work
A. OPT has the authority to reject Work in accordance with Article 16. OAR is to issue a
Defective Work Notice to Contractor and document when Defective Work has been
corrected or accepted in accordance with Article 16.
10.05 Shop Drawings, Modifications and Payments
A. Designer's authority related to Shop Drawings and Samples are described in the Contract
Documents.
B. Designer's authority related to design calculations and design drawings submitted in
response to a delegation of professional design services are described in Paragraph 7.15.
C. OAR and Designer's authority related to Modifications is described in Article 11.
D. OAR's authority related to Applications for Payment is described in Articles 15 and 17.
10.06 Decisions on Requirements of Contract Documents and Acceptability of Work
A. OAR is to render decisions regarding non-technical or contractual / administrative
requirements of the Contract Documents and will coordinate the response of the OPT to
Contractor.
B. Designer is to render decisions regarding the conformance of the Work to the requirements
of the Contract Documents. Designer will render a decision to either correct the Defective
Work,or accept the Work under the provisions of Paragraph 16.04,if Work does not conform
to the Contract Documents. OAR will coordinate the response of the OPT to Contractor.
C. OAR will issue a Request for a Change Proposal if a Modification is required. OAR will provide
documentation for changes related to the non-technical or contractual / administrative
requirements of the Contract Documents. Designer will provide documentation if design
related changes are required.
D. Contractor may appeal Designer's decision by submitting a Change Proposal if Contractor
does not agree with the Designer's decision.
10.07 Limitations on OAR's and Designer's Authority and Responsibilities
A. OPT is not responsible for the acts or omissions of Contractor's Team. No actions or failure
to act, or decisions made in good faith to exercise or not exercise the authority or
responsibility available under the Contract Documents creates a duty in contract, tort, or
otherwise of the OPT to the Contractor or members of the Contractor's Team.
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 12 of 22
ARTICLE 11—AMENDING THE CONTRACT DOCUMENTS; CHANGES IN THE WORK
ARTICLE 12—CHANGE MANAGEMENT
12.01 Requests for Change Proposal
A. Designer will initiate Modifications by issuing a Request for a Change Proposal (RCP).
1. Designer will prepare a description of proposed Modifications.
2. Designer will issue the Request for a Change Proposal form to Contractor. A number
will be assigned to the Request for a Change Proposal when issued.
3. Return a Change Proposal in accordance with Paragraph 12.02 to the Designer for
evaluation by the OPT.
12.02 Change Proposals
A. Submit a Change Proposal (CP) to the Designer for Contractor initiated changes in the
Contract Documents or in response to a Request for Change Proposal.
1. Use the Change Proposal form provided.
2. Assign a number to the Change Proposal when issued.
3. Include with the Change Proposal:
a. A complete description of the proposed Modification if Contractor initiated or
proposed changes to the OPT's description of the proposed Modification.
b. The reason the Modification is requested, if not in response to a Request for a
Change Proposal.
c. A detailed breakdown of the cost of the change if the Modification requires a
change in Contract Price. The itemized breakdown is to include:
1) List of materials and equipment to be installed;
2) Man hours for labor by classification;
3) Equipment used in construction;
4) Consumable supplies,fuels, and materials;
S) Royalties and patent fees;
6) Bonds and insurance;
7) Overhead and profit;
8) Field office costs;
9) Home office cost; and
10) Other items of cost.
d. Provide the level of detail outlined in the paragraph above for each Subcontractor
or Supplier actually performing the Work if Work is to be provided by a
Subcontractor or Supplier. Indicate appropriate Contractor mark-ups for Work
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 13 of 22
provided through Subcontractors and Suppliers. Provide the level of detail outline
in the paragraph above for self-performed Work.
e. Submit Change Proposals that comply with Article 15 for Cost of Work.
f. Provide a revised schedule. Show the effect of the change on the Project Schedule
and the Contract Times.
B. Submit a Change Proposal to the Designer to request a Field Order.
C. A Change Proposal is required for all substitutions or deviations from the Contract
Documents.
D. Request changes to products in accordance with Article 25.
12.03 Designer Will Evaluate Request for Modification
A. Designer will issue a Modification per Article 11 if the Change Proposal is acceptable to the
Owner. Designer will issue a Change Order or Contract Amendment for any changes in
Contract Price or Contract Times.
1. Change Orders and Contract Amendments will be sent to the Contractor for execution
with a copy to the Owner recommending approval. A Work Change Directive may be
issued if Work needs to progress before the Change Order or Contract Amendment can
be authorized by the Owner.
2. Work Change Directives, Change Orders, and Contract Amendments can only be
approved by the Owner.
a. Work performed on the Change Proposal prior to receiving a Work Change
Directive or approval of the Change Order or Contract Amendment is performed at
the Contractor's risk.
b. No payment will be made for Work on Change Orders or Contract Amendments
until approved by the Owner.
B. The Contractor may be informed that the Request for a Change Proposal is not approved and
construction is to proceed in accordance with the Contract Documents.
ARTICLE 13—CLAIMS
13.01 Claims
13.02 Claims Process
A. Claims must be initiated by written notice. Notice must conspicuously state that it is a notice
of a Claim in the subject line or first sentence. Notice must also list the date of first occurrence
of the claimed event.
B. Claims by Contractor must be in writing and delivered to the Owner, Designer and the OAR
within 7 days:
1. After the start of the event giving rise to the Claim; or
2. After a final decision on a Change Proposal has been made.
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 14 of 22
C. Claims by Contractor that are not received within the time period provided by section
13.02(B) are waived. Owner may choose to deny such Claims without a formal review. Any
Claims by Contractor that are not brought within 90 days following the termination of the
Contract are waived and shall be automatically deemed denied.
D. Claims by Owner must be submitted by written notice to Contractor.
E. The responsibility to substantiate a Claim rests with the entity making the Claim. Claims must
contain sufficient detail to allow the other party to fully review the Claim.
1. Claims seeking an adjustment of Contract Price must include the Contractor's job cost
report. Provide additional documentation as requested by OAR.
2. Claims seeking an adjustment of Contract Time must include native schedule files in
Primavera or MS Project digital format. Provide additional documentation as
requested by OAR.
F. Contractor must certify that the Claim is made in good faith, that the supporting data is
accurate and complete, and that to the best of Contractor's knowledge and belief, the relief
requested accurately reflects the full compensation to which Contractor is entitled.
G. Claims by Contractor against Owner and Claims by Owner against Contractor, including those
alleging an error or omission by Designer but excluding those arising under Section 7.12,shall
be referred initially to Designer for consideration and recommendation to Owner.
H. Designer may review a Claim by Contractor within 30 days of receipt of the Claim and take
one or more of the following actions:
1. Request additional supporting data from the party who made the Claim;
2. Issue a recommendation;
3. Suggest a compromise; or
4. Advise the parties that Designer is not able to make a recommendation due to
insufficient information or a conflict of interest.
I. If the Designer does not take any action,the claim shall be deemed denied.
J. The Contractor and the Owner shall seek to resolve the Claim through the exchange of
information and direct negotiations. If no agreement is reached within 90 days, the Claim
shall be deemed denied. The Owner and Contractor may extend the time for resolving the
Claim by mutual agreement. Notify OAR of any actions taken on a Claim.
K. Owner and Contractor may mutually agree to mediate the underlying dispute at any time
after a recommendation is issued by the Designer.
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 15 of 22
ARTICLE 14—PREVAILING WAGE RATE REQUIREMENTS
ARTICLE 15—COST OF THE WORK;ALLOWANCES; UNIT PRICE WORK
ARTICLE 16—TESTS AND INSPECTIONS; CORRECTION, REMOVAL,OR ACCEPTANCE OF DEFECTIVE WORK
ARTICLE 17—PAYMENTS TO CONTRACTOR;SET-OFFS; COMPLETION; CORRECTION PERIOD
ARTICLE 18—SUSPENSION OF WORK AND TERMINATION
ARTICLE 19— PROJECT MANAGEMENT
ARTICLE 20—PROJECT COORDINATION
20.01 Work Included
20.02 Document Submittal
20.03 Communication During Project
A. The OAR is to be the first point of contact for all parties on matters concerning this Project.
B. The Designer will coordinate correspondence concerning:
1. Documents, including Applications for Payment.
2. Clarification and interpretation of the Contract Documents.
3. Contract Modifications.
4. Observation of Work and testing.
5. Claims.
20.04 Requests for Information
A. Submit Request for Information (RFI) to the Designer to obtain additional information or
clarification of the Contract Documents.
1. Submit a separate RFI for each item on the form provided.
2. Attach adequate information to permit a written response without further clarification.
Designer will return requests that do not have adequate information to the Contractor
for additional information. Contractor is responsible for all delays resulting from
multiple document submittals due to inadequate information.
3. A response will be made when adequate information is provided. Response will be
made on the RFI form or in attached information.
B. Response to an RFI is given to provide additional information, interpretation, or clarification
of the requirements of the Contract Documents, and does not modify the Contract
Documents.
C. Designer will initiate a Request for a Change Proposal (RCP) per Article 12 if the RFI indicates
that a Contract Modification is required.
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 16 of 22
ARTICLE 21—QUALITY MANAGEMENT
ARTICLE 22—FINAL RESOLUTION OF DISPUTES
ARTICLE 23—MINORITY/MBE/DBE PARTICIPATION POLICY
ARTICLE 24—DOCUMENT MANAGEMENT
ARTICLE 25—SHOP DRAWINGS
25.01 Work Included
A. Shop Drawings are required for those products that cannot adequately be described in the
Contract Documents to allow fabrication, erection, or installation of the product without
additional detailed information from the Supplier.
B. Submit Shop Drawings as required by the Contract Documents and as reasonably requested
by the OPT to:
1. Record the products incorporated into the Project for the Owner;
2. Provide detailed information for the products proposed for the Project regarding their
fabrication, installation, commissioning, and testing; and
3. Allow the Designer to advise the Owner if products proposed for the Project by the
Contractor conform, in general,to the design concepts of the Contract Documents.
25.02 Quality Assurance
25.03 Contractor's Responsibilities
25.04 Shop Drawing Requirements
A. Provide adequate information in Shop Drawings and Samples so Designer can:
1. Assist the Owner in selecting colors,textures, or other aesthetic features.
2. Compare the proposed features of the product with the specified features and advise
Owner that the product does, in general, conform to the Contract Documents.
3. Compare the performance features of the proposed product with those specified and
advise the Owner that the product does, in general,conform to the performance criteria
specified in the Contract Documents.
4. Review required certifications, guarantees, warranties, and service agreements for
compliance with the Contract Documents.
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 17 of 22
25.OS Special Certifications and Reports
25.06 Warranties and Guarantees
25.07 Shop Drawing Submittal Procedures
25.08 Sample and Mockup Submittal Procedures
25.09 Requests for Deviation
25.10 Designer Responsibilities
A. Shop Drawings will be received by the Designer. Designer will log the documents and review
per this Article for general conformance with the Contract Documents.
1. Designer's review and approval will be only to determine if the products described in
the Shop Drawing or Sample will, after installation or incorporation into the Work,
conform to the information given in the Contract Documents and be compatible with
the design concept of the completed Project as a functioning whole as indicated by the
Contract Documents.
2. Designer's review and approval will not extend to means, methods, techniques,
sequences,or procedures of construction or to safety precautions or programs incident
thereto.
3. Designer's review and approval of a separate item as such will not indicate approval of
the assembly in which the item functions.
B. Comments will be made on items called to the attention of the Designer for review and
comment. Any marks made by the Designer do not constitute a blanket review of the
document submittal or relieve the Contractor from responsibility for errors or deviations
from the Contract requirements.
1. Designer will respond to Contractor's markups by either making markups directly in the
Shop Drawings file using the color green or by attaching a Document Review Comments
form with review comments.
2. Shop Drawings that are reviewed will be returned with one or more of the following
status designations:
a. Approved: Shop Drawing is found to be acceptable as submitted.
b. Approved as Noted: Shop Drawing is Approved so long as corrections or notations
made by Designer are incorporated into the Show Drawing.
c. Not Approved: Shop Drawing or products described are not acceptable.
3. Shop Drawing will also be designated for one of the following actions:
a. Final distribution: Shop Drawing is acceptable without further action and has been
filed as a record document.
b. Shop Drawing not required: A Shop Drawing was not required by the Contract
Documents. Resubmit the document per Article 26.
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 18 of 22
c. Cancelled: This action indicates that for some reason, the Shop Drawing is to be
removed from consideration and all efforts regarding the processing of that
document are to cease.
d. Revise and resubmit: Shop Drawing has deviations from the Contract Documents,
significant errors, or is inadequate and must be revised and resubmitted for
subsequent review.
e. Resubmit with corrections made: Shop Drawing is "Approved as Noted," but has
significant markups. Make correction and notations to provide a revised document
with markup incorporated into the original document so that no markups are
required.
f. Returned without review due to excessive deficiencies: Document does not meet
the requirement of the Specifications for presentation or content to the point
where continuing to review the document would be counterproductive to the
review process or clearly does not meet the requirements of the Contract
Documents. Revise the Shop Drawing to comply with the requirements of this
Section and resubmit.
g. Actions a through c will close out the Shop Drawing review process and no further
action is required as a Shop Drawing. Actions d through f require follow up action
to close out the review process.
4. Drawings with a significant or substantial number of markings by the Contractor may be
marked "Approved as Noted" and "Resubmit with corrections made." These drawings
are to be revised to provide a clean record of the Shop Drawing. Proceed with ordering
products as the documents are revised.
5. Dimensions or other data that does not appear to conform to the Contract Documents
will be marked as "At Variance With" (AVW) the Contract Documents or other
information provided. The Contractor is to make revisions as appropriate to comply
with the Contract Documents.
C. Bring deviations to the Shop Drawings to the attention of the Designer for approval by using
the Shop Drawing Deviation Request form. Use a single line for each requested deviation so
the Status and Action for each deviation can be determined for that requested deviation. If
approval or rejection of a requested deviation will impact other requested deviations, then
all related deviations should be included in that requested deviation line so the status and
action can be determined on the requested deviation as a whole.
D. Requested deviations will be reviewed as possible Modification to the Contract Documents.
1. A Requested deviation will be rejected as "Not Approved" if the requested deviation is
unacceptable. Contractor is to revise and resubmit the Shop Drawing with corrections
for approval.
2. A Field Order will be issued by the Designer for deviations approved by the Designer if
the requested deviation is acceptable and if the requested deviation will not result in a
change in Contract Price or Contract Times. Requested deviations from the Contract
Documents may only be approved by Field Order.
3. A requested deviation will be rejected if the requested deviation is acceptable but the
requested deviation will or should result in a change in Contract Price or Contract Times.
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 19 of 22
Submit any requested deviation that requires a change in Contract Price or Contract
Times as a Change Proposal for approval prior to resubmitting the Shop Drawing.
E. Contractor is to resubmit the Shop Drawing until it is acceptable and marked Approved or
Approved as Noted and is assigned an action per Paragraph 25.10.13 that indicates that the
Shop Drawing process is closed.
F. Information that is submitted as a Shop Drawings that should be submitted as Record Data
or other type of document, or is not required may be returned without review, or may be
deleted. No further action is required and the Shop Drawing process for this document will
be closed.
ARTICLE 26—RECORD DATA
26.01 Work Included
26.02 Quality Assurance
26.03 Contractor's Responsibilities
26.04 Record Data Requirements
26.05 Special Certifications and Reports
26.06 Warranties and Guarantees
26.07 Record Data Submittal Procedures
26.08 Designer's Responsibilities
A. Record Data will be received by the Designer, logged, and provided to Owner as the Project
record.
1. Record Data may be reviewed to see that the information provided is adequate for the
purpose intended. Record Data not meeting the requirements of Paragraph 26.02 may
be rejected as unacceptable.
2. Record Data is not reviewed for compliance with the Contract Documents. Comments
may be returned if deviations from the Contract Documents are noted during the
cursory review performed to see that the information is adequate.
3. Contractor's responsibility for full compliance with the Contract Documents is not
relieved by the review of Record Data. Contract modifications can only be approved by
a Modification.
B. Designer may take the following action in processing Record Data:
1. File Record Data as received if the cursory review indicates that the document meets
the requirements of Paragraph 26.02. Document will be given the status of "Filed as
Received" and no further action is required on that Record Data.
2. Reject the Record Data for one of the following reasons:
a. The document submittal requirements of the Contract Documents indicate that the
document submitted as Record Data should have been submitted as a Shop
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 20 of 22
Drawing. The Record Data will be marked "Rejected" and "Submit Shop Drawing."
No further action is required on this document as Record Data and the Record Data
process will be closed. Resubmit the document as a Shop Drawing per Article 25.
b. The cursory review indicates that the document does not meet the requirements
of Paragraph 26.02. The Record Data will be marked "Rejected" and "Revise and
Resubmit." Contractor is to resubmit the Record Data until it is acceptable and
marked "Filed as Received." When Record Data is filed, no further action is
required and the Record Data process will be closed.
c. The Record Data is not required by the Contract Documents nor is the Record Data
applicable to the Project. The Record Data will be marked "Rejected" and "Cancel
- Not Required." No further action is required and the Record Data process will be
closed.
C. Contractor is to resubmit the Record Data until it is acceptable and marked "Filed as
Received."
ARTICLE 27—CONSTRUCTION PROGRESS SCHEDULE
ARTICLE 28—VIDEO AND PHOTOGRAPHIC DOCUMENTATION
ARTICLE 29—EXECUTION AND CLOSEOUT
29.01 Substantial Completion
A. Notify the Designer that the Work or a designated portion of the Work is substantially
complete per the General Conditions. Include a list of the items remaining to be completed
or corrected before the Project will be considered to be complete.
B. OPT will visit the Site to observe the Work within a reasonable time after notification is
received to determine the status of the Project.
C. Designer will notify the Contractor that the Work is either substantially complete or that
additional Work must be performed before the Project will be considered substantially
complete.
1. Designer will notify the Contractor of items that must be completed before the Project
will be considered substantially complete.
2. Correct the noted deficiencies in the Work.
3. Notify the Designer when the items of Work in the Designer's notice have been
completed.
4. OPT will revisit the Site and repeat the process.
5. Designer will issue a Certificate of Substantial Completion to the Contractor when the
OPT considers the Project to be substantially complete. The Certificate will include a
tentative list of items to be corrected before Final Payment will be recommended.
6. Review the list and notify the Designer of any objections to items on the list within 10
days after receiving the Certificate of Substantial Completion.
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 21 of 22
29.02 Final Inspections
A. Notify the Designer when:
1. Work has been completed in compliance with the Contract Documents;
2. Equipment and systems have been tested per Contract Documents and are fully
operational;
3. Final Operations and Maintenance Manuals have been provided to the Owner and all
operator training has been completed;
4. Specified spare parts and special tools have been provided; and
5. Work is complete and ready for final inspection.
B. OPT will visit the Site to determine if the Project is complete and ready for Final Payment
within a reasonable time after the notice is received.
C. Designer will notify the Contractor that the Project is complete or will notify the Contractor
that Work is Defective.
D. Take immediate steps to correct Defective Work. Notify the Designer when Defective Work
has corrected. OPT will visit the Site to determine if the Project is complete and the Work is
acceptable. Designer will notify the Contractor that the Project is complete or will notify the
Contractor that Work is Defective.
E. Submit the Request for Final Payment with the closeout documents described in Paragraph
29.06 if notified that the Project is complete and the Work is acceptable.
ARTICLE 30—MISCELLANEOUS
END OF SECTION
Excerpt from FORM 00 72 00 GENERAL CONDITIONS for Construction Projects related to design services EXHIBIT D
Page 22 of 22
SUPPElER N UMBER
TO BE ASSIGNED BY CITY
PURCHASING DIVISION
rr►�tir
City of CITY OF CORPUS CHRISTI
Corpus DISCLOSURE OF INTEREST
Christi
City of Corpus Christi Ordinance 17112, as amended,requires all persons or firms seeking to do business
with the City to provide the following information. Every question must be answered. if the question is
not applicable, answer with "NA". See reverse side for Filing Requirements, Certifications and
definitions.
COMPANY NAME: Hanson Professional Services Inc
P. O.BOX:
STREET ADDRESS: 4501 Gollihar Road CITY: Corpus Christi ZIP: 78411
FIRM IS: 1. Corporation ❑x 2. Partnership ❑ 3. Sole Owner ❑
4. Association 5. Other
DISCLOSURE QUESTIONS
If additional space is necessary,please use the reverse side of this page or attach separate sheet.
1. State the names of each "employee" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named"firm."
Name Job Title and City Department(if known)
N/A
2. State the names of each "official" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named"firm."
Name Title
N/A
3. State the names of each "board member" of the City of Corpus Christi having an "ownership interest"
constituting 3% or more of the ownership in the above named"firm."
Name Board, Commission or Committee
N/A
4. State the names of each employee or officer of a "consultant" for the City of Corpus Christi who
worked on any matter related to the subject of this contract and has an "ownership interest"
constituting 3% or more of the ownership in the above named"firm."
Name Consultant
N/A
Page 1 of 2
Signature: steak
Email: citysecretary@cctexas.com
FILING REQUIREMENTS
If a person who requests official action on a matter knows that the requested action will confer an
economic benefit on any City official or employee that is distinguishable from the effect that the action
will have on members of the public in general or a substantial segment thereof,you shall disclose that fact
in a signed writing to the City official, employee or body that has been requested to act in the matter,
unless the interest of the City official or employee in the matter is apparent. The disclosure shall also be
made in a signed writing filed with the City Secretary. [Ethics Ordinance Section 2-349 (d)]
CERTIFICATION
I certify that all information provided is true and correct as of the date of this statement, that I have not
knowingly withheld disclosure of any information requested; and that supplemental statements will be
promptly submitted to the City of Corpus Christi,Texas as changes occur.
Certifying Person: Wilfredo Rivera, Jr., P.E. Title: Vice-President
(Type or Print)
Signature of Certifying Date: 12/17/24
Person:
DEFINITIONS
a. "Board member." A member of any board, commission, or committee appointed by the City
Council of the City of Corpus Christi, Texas.
b. "Economic benefit". An action that is likely to affect an economic interest if it is likely to have an
effect on that interest that is distinguishable from its effect on members of the public in general or a
substantial segment thereof.
c. "Employee." Any person employed by the City of Corpus Christi, Texas either on a full or part-
time basis,but not as an independent contractor.
d. "Firm." Any entity operated for economic gain, whether professional, industrial or commercial, and
whether established to produce or deal with a product or service, including but not limited to, entities
operated in the form of sole proprietorship, as self-employed person, partnership, corporation,joint
stock company, joint venture, receivership or trust, and entities which for purposes of taxation are
treated as non-profit organizations.
e. "Official." The Mayor, members of the City Council, City Manager, Deputy City Manager,
Assistant City Managers, Department and Division Heads, and Municipal Court Judges of the City of
Corpus Christi, Texas.
f. "Ownership Interest." Legal or equitable interest, whether actually or constructively held, in a
firm, including when such interest is held through an agent, trust, estate, or holding entity.
"Constructively held" refers to holdings or control established through voting trusts, proxies, or
special terms of venture or partnership agreements."
g. "Consultant."Any person or firm, such as engineers and architects, hired by the City of Corpus
Christi for the purpose of professional consultation and recommendation.
Page 2 of 2