HomeMy WebLinkAboutC2025-032 - 3/25/2025 - Approved CITY OF CORPUS CHRISTI ENGINEERING SERVICES CHANGE ORDER VENDOR ID NO.: 33922 PROJECT: Mary Rhodes Pipeline Phase 1 Pump System Improvements CONTRACT NO.: 6261 CONTRACTOR: H&S Constructors Inc ENGINEER: HDR Engineering Inc PROJECT NUMBER: E13037 PROJECT MANAGER: Sandra Gomez CHANGE ORDER NO: 1 OPERATING DEPT.: Water CHANGE ORDER DATE: 3/27/2025 Make the following additions,modifications or deletions to the work described in the Contract Documents: ADDITIONS Quantity Unit Unit Price Total PART C NEW C-NI Environmental improvements 1 LS $ 141,382.00 $ 141,382.00 NEW C-N2 STA line Waterworks 1 LS $ 83,153.00 $ 83,153.00 NEW C-N3 Pump Solutions Inc 1 LS $ 727,375.00 $ 727,375.00 NEW C-N4 Rabalais I&E sub 1 LS $ 803,705.00 $ 803,705.00 NEW C-N5 H&S labor,Equipment&Material 1 LS $ 98,582.00 $ 98,582.00 Subtotal: S 1,854,197.00 Additions Total: S 1,854,197.00 DELETIONS Quantity Unit Unit Price Total N/A Additional Calendar Days requested 0 NET TOTAL OF THIS CHANGE ORDER: S 1,854,197.00 Why was this Change necessary: With the increase in severe drought conditions.the operation of Mary Rhodes Pipeline with reliable redundancy is getting more and more critical to the City's water supply.For this reason,City staff requested the Contractor to add one more redundancy booster pump,variable frequency drive,and electrical and mechanical improvements to the Woodsboro Pump Station through a construction change order. This Contract Modification represents Final Adjustment for any and all amounts due or to become due to Contractor far changes referred to herein.Contractor further releases all other claims,if any (except those claims previously submitted in writing in strict accordance with the Contract),for additional compensation under this Contract,including without limitation any rights Contractor may have for additional compensation arising out of delays or disruption of Contractor's schedule as may have arisen prior to the date of this Contract Modification.Unless otherwise expressly provided herein,the time of completion and all other terms and conditions of the Contract remain unchanged CITY OF CORPUS CHRISTI ENGINEERING SERVICES CHANGE ORDER VENDOR ID NO.: 33922 PROJECT: Mary Rhodes Pipeline Phase 1 Pump System Improvements CONTRACT NO.: 6261 CONTRACTOR: H&S Constructors Inc ENGINEER: HDR Engineering Inc PROJECT NUMBER: E13037 PROJECT MANAGER: Sandra Gomez CHANGE ORDER NO: 1 OPERATING DEPT.: Water CHANGE ORDER DATE: 3/27/2025 Original Contract Amount $ 12,174,975.00 Proposed Change Order Maximum Change Order Contingency Amount(25%) $ 3,043,743.75 Funding Source(s) Remaining Available Contingency Amount(including this CO) $ 1,189,546.75 SECTION/FUND FUND: 4481-45-89 Previously Approved Change Order Amount $ ACCOUNT: 550910 Proposed Change Order Amount $ 1,854,197.00 for use by CAP ACTIVITY:JEI3037-01-4481-EXP Revised Contract Amount S 14,029,172.00 for use by CAP AMOUNT: $1 854 197.00 Percent of Total Change Orders(including this CO) 15.23% SECTION/FUND Original Contract Time for Substantial Completion 540 CD's FUND: n/a Notice to Proceed Date 11/26/2024 ACCOUNT: a Original Substantial Completion Date 5/20/2026 ACTIVITY: a AMOUNT: a Previously Approved Change Order Time 0 CD's Additional Time on This Change Order 0 CD's SECTION/FUND Revised Contract Time for Substantial Completion 540 CD's FUND: a Revised Substantial Completion Date 5/20/2026 for use b CAP ACCOUNT: a ACTIVITY: a CONTRACTOR AMOUNT: n/a REQUESTED BY: H&S Constructors Inc SECTION/FUND FUND: a ACCOUNT: n/a Fernando Garcia Date ACTIVITY: a Project Manager AMOUNT: n/a CITY OF CORPUS CHRISTI L, Apr 1 2025 - � Apr 1,2025 REVIEWED BY:Af°0�pll,-515.—DT7 APPROVEDBY: der 11.1d,RE(Ap,1,2azsrs:2eDT) Arnulfo Garcia Date ($50,000.00-$100,000.00)JeffH.Edmonds,P.E. Date Finance&Resource Manager Director of Engineering Services �a� Apr 1,2025 RECOMMENDED BY• Jiangang(Daniel)Deng,Ph.D.,P.E. Date Assistant Director of Construction Inspection Apr 1 2025 M2025-033 initials APPROVED AS TO FORM: Janet Whitehead(Apr 1,202513:u3 CDT) Authorized Legistrar No.Janet Whitehead Date 3/25/2025 R H/ p S U Assistant City Attorney By Council Council Date R U Enc�� Ap r 1,2025 � y� RECOMMENDED BY:Amy Cowley(Apr 1,2o25 :10CDT) ATTEST: sJona eta.00utooscon 04/03/2025 Amy Cowley Date (Council)Rebecca Huerta Date Management and Budget Designee (>$100,000.00 or>_25%)City Secretary H&S Constructors,Inc. P. O. Box 9014 Corpus Christi, Texas 78469 (361)289-5272 ADDITIONAL WORK AUTHORIZATION # 3 DATE OWNER'S NAME PHONE City Of Corpus Christi 11/26/24 STREET JOB NAME JOB NUMBER P.O. Box 9014 Mary Rhodes Pipeline Phase 1 Pump System 7560-25 CITY STATE STREET Corpus Christi TX EXISTING CONTRACT NO. DATE OF EXISTING CONTRACT CITY STATE 11-26-24 Corpus Christi TX We hereby agree to the specified changes and charges listed below: AWA#3 is for RFI#4 adding new pump&VFD in Woodsboro Environmental improvements,Inc$122,939.85+15%=$141,381 STAline Waterworks $72,306.60+15%=$ 83,152 Pump Solutions Inc $632,500.00+15%=$727,375 Rabalais I&E sub $765,434.00+5%=$803,706 H&S Labor&Equipment $88,864 H&S Material $8,450+15% $ 9,718 ADDITIONAL CHARGE FOR ABOVE WORK IS: S 1,854,197 Payment to be made as follows: NET 30 DAYS OWNER Above additional work to be performed under same conditions as specified in original contract unless otherwise stipulated. Authorizing Signature: Date: CONTRACTOR We hereby agree to furnish labor and materials-complete in accordance with the above specifications,at abovestated price. Fernando Garcia/Darryl Ressmann 2/12/25 Authorized Siganture: Date: 03 CHANGE ORDER NO. AWA11-01 I hereby acknowledge the satisfactory completion of the above described work in consideration of which I (or we) hereby agree to pay you for same at your office in Corpus Christi, Nueces County, Texas, on or before the loth of the month following invoice. �vs G� `kCUIFF gwt o Yss2 AGENDA MEMORANDUM Action Item for the City Council Meeting of March 25, 2025 DATE: March 18, 2025 TO: Peter Zanoni, City Manager FROM: Jeff H. Edmonds, P.E., Director of Engineering Services ieffreye(a�cctexas.com (361) 826-3851 Nick Winkelmann, P.E., Director of Water Systems and Support Services n ickw(D_cctexas.co m (361) 826-1796 Construction Change Orders Mary Rhodes Pipeline Phase I Pump System Improvements (Re-Bid) CAPTION: Motion authorizing the approval of Change Order No. 1 with H&S Constructors, Inc., of Corpus Christi, TX, for the Mary Rhodes Pipeline Phase I Pump System Improvements Project, in the amount of $1,854,197 for a total amount not to exceed $14,029,172 with FY 2025 funding available from the Raw Water Capital Fund. SUMMARY: This change order authorizes additional funding for additional upgrades consisting of the addition of one new booster pump and one new variable frequency drive (VFD) as well as associated electrical and mechanical components at the Mary Rhodes Pipeline Pump Station located in Woodsboro. BACKGROUND AND FINDINGS: In October 2024, the City Council awarded a construction contract to H&S Constructors, Inc., of Corpus Christi, TX, for the Mary Rhodes Pipeline Phase I Pump System Improvements Project. The purposes of this project were to upgrade the Bloomington and Woodsboro Booster Pump Stations of Mary Rhodes Pipeline Phase I system to transport more raw water from Lake Texana to the City. The major project scope included adding one booster pump and two VFDs at the Bloomington Pump Station, one VFD at the Woodsboro Pump Station, and upgrading the associated electrical, mechanical and instrumentation components. With the increasingly severe drought conditions, the operation of Mary Rhodes Pipeline with reliable redundancy is getting more and more critical to the City's water supply. For this reason, City staff requested the Contractor to add one more redundancy booster pump, VFD, and electrical and mechanical improvements to the Bloomington Pump Station through a construction change order. The implementation of this change order provides necessary operational redundancy for the Bloomington Pump Station while the City will bring 75 MGD water from Lake Texana to the City under the Operational Schedule 4 of Mary Rhodes Pipeline. H&S Constructors, Inc. is currently engaged in construction on the Mary Rhodes Pipeline Phase I Pump System Improvements Project. The contractor is performing well and is currently completing the planned work on schedule. PROJECT TIMELINE: Change Order No. 1 doesn't add any additional calendar days to the construction contract. The anticipated substantial completion date of the project is May 2026. ALTERNATIVES: City Council could choose not to approve the Change Order No. 1 with H&S Constructors, Inc. Not approving the change order will lead to a lack of redundancy in the system which could remove the ability to keep the MRP pump station and pipeline online if existing equipment experiences an issue. This could result in negative impacts to the water treatment process, and lead to increased downtime if the system experiences an issue affecting water supply to the entire region. There would be additional time and expenses to bid this work, additional cost for new contractor mobilization, and an increased risk of receiving a higher bid or a lower- performing contractor. FISCAL IMPACT: The fiscal impact for Corpus Christi Water in FY 2025 is $1,854,197.00, with funding available from the Raw Water Capital Fund. The capital budget includes $1,854,197.00 for the addition of one new booster pump and one new variable frequency drive (VFD) at the Mary Rhodes Pipeline Pump Station and utilize the allocated funding outlined in the CIP. FUNDING DETAIL: Fund: Raw Water Supply Development Chg CIP (Fund 4481) Department: Water (45) Organization: Grants & Capital Projects Funds (89) Project: Mary Rhodes Pipeline Phase 1 System Improvements Rebid (Project No. E13037) Account: Construction (550910) Activity: E13037-01-4481-EXP Amount: $1,854,197.00 RECOMMENDATION: Staff recommend approval of this Change Order No. 1 in an amount up to $1,854,197.00 for the Mary Rhodes Pipeline Phase I Pump System Improvements Project with H&S Constructors, Inc. to reduce the risk of equipment failure and increase the reliability of the system providing constant water supply through the Mary Rhodes Pipeline. LIST OF SUPPORTING DOCUMENTS: CIP Page Location and Vicinity Map Change Order No. 1 DeZURIK.com DeZURIK `, DeZURIK QUOTATION To: Environmental improvements, Inc. Date of Quote: 01/21/2025 235 Trademark St Quote Number: QUO163641 Buda TX 78610-3566 United States Project Name: Corpus Christi - Mary Rhodes PS NEW Invoice Terms: Net45 TRAIN ADDITION Days Valid: 30 day(s) I.D.(Rep.Use): Line of Business: 4941 Water Treatment Delivery Terms: FFA, Prepaid and Allow Make Order To: DeZURIK, INC. C/O ENVIRONMENTAL IMPROVEMENTS INC 1183 BRITTMORE SUITE 100 HOUSTON TX 77043 United States Joey Justice Tel/Direct:713.461.1111 jjustice@ei2water.com Currency and Values expressed in USD ($) ANY PURCHASE ORDER ISSUED AS A RESULT OF THIS QUOTATION IS SUBJECT TO ALL OF THE MANUFACTURER'S CONDITIONS SET FORTH IN THIS DOCUMENT HEREOF,REASONABLE CONTRACT LANGUAGE NEGOTIATIONS AND FINAL ACCEPTANCE BY DEZURIK AT SARTELL,MN USA. UNLESS OTHERWISE NOTED, QUOTATIONS ARE VALID FOR 30 DAYS. UNTIL ACCEPTANCE OF ORDER, QUOTED PRICES AND DELIVERY ARE SUBJECT TO CHANGE. UNLESS OTHERWISE NOTED, PRICES ARE FIRM FOR SHIPMENT OF GOODS WITHIN 12 MONTHS FROM THE RELEVANT QUOTATION DATE. OUR PRICES ARE BASED ON CURRENT PRICES FOR MATERIAL. IF A SIGNIFICANT MATERIAL PRICE INCREASE OCCURS BETWEEN ORDER ACCEPTANCE AND SHIPMENT DATE, GOODS SCHEDULED TO SHIP BEYOND 12 MONTHS OF THE QUOTATION DATE ARE SUBJECTTO A PRICE ADJUSTMENT BYTHE AMOUNT NECESSARYTO COVER SUCH AN INCREASE. Line# Cust.Line# Qty Order Code 1 1 9745190 BAW,24,F2,DI,NBRN-NBR,250B,D1-S5,CMC-GS-I2A-HD20 Style: BAW - DeZURIK AWWA C504 3-72"; C516 78" and larger Rubber Seated Butterfly Valve(BAW) Size:24-24 Inch (600mm) End Connection: F2- Flanged Drilling;ASME Class 250/300 Body Material: DI- Ductile Iron Packing: NBRN -Acrylonitrile Butadiene; Self Adjusting;-20 to 180' F(-29 to 82' C.) Seat Material: NBR-Acrylonitrile Butadiene;Temperature-20 to 180' F (-29 to 82' C.) Service Class:250B-AWWA Class 250B Disc Material:DI -Ductile Iron with 316 Stainless Steel Edge Shaft Material:S5- 174PH Stainless Steel Options:CMC-Certificate of Material Conformance Coating:S30SCO- Interior:8 mils minimum of Blue DeZURIK Epoxy with Standard (SP10). Exterior:8 mils minimum of Blue Epoxy DeZURIK with Standard (SP10)surface prep Actuator:GS-12A-HD20-G-Series Handwheel;20 In Dia Weight(Approx): 1548 Ibs/703 kgs Min Valve Temperature:-20 Degrees F. Max Temperature: 180 Degrees F. 2 1 9745191 01/21/2025 Page 1 DeZURIK.com DeZURIK `, DeZURIK QUOTATION Line# Cust.Line# Qty Order Code BAW,30,F2,DI,NBRN-NBR,250B,D1-S5,CMC-GS-I2A-HD36 Style: BAW - DeZURIK AWWA C504 3-72"; C516 78" and larger Rubber Seated Butterfly Valve(BAW) Size:30-30 Inch (750mm) End Connection: F2- Flanged Drilling;ASME Class 250/300 Body Material: DI- Ductile Iron Packing: NBRN -Acrylonitrile Butadiene; Self Adjusting;-20 to 180' F(-29 to 82' C.) Seat Material: NBR-Acrylonitrile Butadiene;Temperature-20 to 180' F (-29 to 82' C.) Service Class:250B-AWWA Class 250B Disc Material:DI -Ductile Iron with 316 Stainless Steel Edge Shaft Material:S5- 174PH Stainless Steel Options:CMC-Certificate of Material Conformance Coating:S30SCO- Interior:8 mils minimum of Blue DeZURIK Epoxy with Standard (SP10). Exterior:8 mils minimum of Blue Epoxy DeZURIK with Standard (SP10)surface prep Actuator:GS-12A-HD36-G-Series Handwheel;36 In Dia Weight(Approx):2518 Ibs/ 1143 kgs Min Valve Temperature:-20 Degrees F. Max Temperature: 180 Degrees F. 5 2 9379177 PEC,1,T1,CI,NBR,CR-LV Style: PEC-Eccentric Plug Valve, Rectangular Port(AWWA C517)(PEC) Size: 1 - 1 Inch (25mm);SST Bearings End Connection:T1 -Threaded NPT Ends Body Material: Cl - Cast Iron; (.5"-12" (15-300mm) Pressure Rating 175 psi (1210 kPa); (14"&larger(350mm and larger)Pressure Rating 150 psi (1030 kPa) Packing: NBR - .5" - 3" Acrylonitrile-Butadiene Reinforced filler in a PTFE U-ring, -20 to 180' F. (-29 to 83' C.); 4" & Larger Acrylonitrile-Butadiene Reinforced V-type , -20 to 250' F. (-29 to 121° C.) Plug Facing: CR-Chloroprene;-20 to 180' F.(-29 to 83' C.) Coating: SBO - Exterior: 4 mils minimum of Blue Epoxy DeZURIK with Standard (SP10) surface prep Actuator: LV-Lever; Non-Removable Weight(Approx):5 Ibs/3 kgs Min Valve Temperature:-20 Degrees F. Max Temperature: 180 Degrees F. Max Valve Pressure: 175 psig 6 2 9745194 AVV,1,140,T1,D1,300A,NBR-S2-S2-S2,CSV-SB 16'DAT Style:AVV-Air/Vacuum Valve(AVV) Size: 1 - 1 Inch (25mm) Body Style: 140-Series 140; .5-3"(15-80mm); NPT Outlet, Same size as inlet 01/21/2025 Page 2 DeZURIK.com DeZURIK `, DeZURIK QUOTATION Line# Cust.Line# Qty Order Code End Connection:T1 -Threaded Inlet NPT Body Material: DI - Ductile Iron (Nipple and Flange are Carbon Steel for F_N End Connection) Cold Working Press: 300A - 11-300 psi; .5"-2" (15-50mm) Valves with T1 or F2N End Connections Seating Surface: NBR-Acrylonitrile-Butadiene(NBR) Trim Material:S2-316 Stainless Steel Baffle Material:S2-316 Stainless Steel Float Material:S2-316 Stainless Steel Options:CSV-Surge Check Valve, Series 1900/1700 Options:SB16-316 Stainless Steel Bolting Coating: L41LD1 - 12 mils minimum of Blue Fusion Bonded Epoxy on Interior and Exterior with SP5 Surface Prep Other Accessories:DAT-Double Acting Throttling Device Weight(Approx):22 Ibs/ 10 kgs Min Valve Pressure: 11 psig Max Valve Pressure:300 psig 7 1 9XXXXXX VBL,18,SS,F1,Dl,150,ML-DIS5-S2'X*A36507 Style:VBL-AWWA Metal Seated Ball Valve(VBL) Size: 18- 18 Inch (450mm) Body Style:SS-Single Seated End Connection: F1 - Flanged Drilling;ASME Class 150 Body Material: DI- Ductile Iron Cold Working Press: 150-Class 150 PSI Body/Adpt Seat Ring:ML- Monel Shaft Material:DIS5- Ductile Iron Ball and 174PH Stainless Steel Ball Seat Ring Material:S2-316 Stainless Steel Coating: S30SCO - 8 mils minimum of Blue DeZURIK Epoxy on Interior and Exterior with Standard (SP10)surface prep Actuator:X-Enter your modification here Weight(Approx):2273 Ibs/ 1032 kgs Max Temperature:450 Degrees F. Max Valve Pressure:250 psig Modification: A36507 - ROTORK IQM25 FA14 B4 [IP68] 208/3/60 57RPM + IW8R/ FA25/384:1 -P/N 1464573 Setup Text: Flow Velocity: 15 Ft/second Seat Shut-Off Pressure: 120 Total $122,939.85 01/21/2025 Page 3 line STAIine Waterworks, Inc. 5441 IH37 78408 Corpus Christi, Texas 78403 361-299-2900 Date: January 23rd, 2024 Quote Number: 12325C01 Project Name: Mary Rhodes Pipeline Phase I Page 1 of 6 To: H&S Constructors Bid Date: November 21St, 2024 Engineer: 1IDR STAline Waterworks Contact: Craig D. Brown STAline Waterworks, Inc., is pleased to offer the attached proposal for the aforementioned project. Prices in this proposal are firm for acceptance until January 3111, 2025.4 Prices are quoted F.O.B. Jobsite and as noted. PROJECT NAME:MARY RHODES PIPELINE PHASE I SYSTEM IMPROVEMENTS-REBID PAGE 1 DATE OF LETTING:JULY 24TH,2024 @ 14:00 PROJECT ENGINEER:HDR LINE QUANTITY UOM DESCRIPTION UNIT PRICE EXTEND PRICE ITEM TOTAL 10 20 1 EA PUMP SUCTION AWWA C200 STEEL HEADER TO INCLUDE. $26,334.50 $26,334.50 30 1)30"X20"MITERED STEEL REDUCING 90 FLXPE 40 1)30"FLANGE,20')20"PIPE EPDXYCOATED 50 EXTERIOR AND CEMENT LINED 60 1 EA #DJ400 20"RESTRAINED DISMANTLING JOINT $4,579.50 $4,579.50 70 FBE W/304SS BOLTS M11 80 2 EA 30"INSULATED FLG BOLT&l/8"FF PHENOLIC GASK SET $1,564.50 $3,129.00 90 16 EA 1-14"X4-1/8"CAP SCREWS $13.00 $208.00 100 1 EA 20"INSULATED FLG BOLT&1/8"FF PHENOLIC GASK SET $1,265.25 $1,265.25 110 1 EA 20"X4"X.250"HDG 180 PIPE STRAP $785.75 $785.75 120 1 EA 63"X2"X1/4"NEOPRENE PAD $38.75 $38.75 130 4 EA 7/8"X3"316SS KWICK ANCHOR WASH&NUT $20.25 $81.00 140 150 BOOSTER PUMP BY OTHERS 160 170 2 EA 1"X2"304SS NIPPLE $4.55 $9.10 180 2 EA 1"304SS THREADED BALL VALVE $39.65 $79.30 190 2 EA 1"X2"304SS NIPPLE $4.55 $9.10 200 2 EA #S-140C 1"AIR RELEASE VALVE BY OTHERS 210 220 1 EA 1X1/2"304SS HEX BUSHING $9.60 $9.60 230 1 EA 1/2"X3"304SS NIPPLE $4.15 $4.15 240 1 EA 1/2"304SS THREADED BALL VALVE $20.65 $20.65 250 1 EA 1/2"X1/4"304SS HEX BUSHING $3.05 $3.05 260 1 EA 0-200 PSI PRESSURE GAUGE SS 2-1/2"DIAL $29.75 $29.75 270 280 DISCHARGE PIPING 290 1 EA #DJ400 18"RESTRAINED DISMANTLING JOINT $4,052.00 $4,052.00 300 FBE W/304SS BOLTS Ml1 310 1 EA PUMP DISCHARGE AWWA C200 STEEL HEADER TO INCLUDE: $12,667.75 $12,667.75 320 2)18"FLANGES,2')18"PIPE WITH 1"WELD-O-LET,1)18"X24" 330 MITERED STEEL INCREASING 90 FLXFL WITH 1)2"&l)1"WELD-O-LET 340 EPDXYCOATED EXTERIOR AND CEMENT LINED 350 0 EA 18"FLG PUMP CONTROL BALL VALVE WITH BY OTHERS 360 ELECTRIC MOTOR OPERATOR #V112 370 0 EA 24"FLG BUTTERFLY VALVES WITH HDWHEEL BY OTHERS 380 2 EA 24"300#INSULATED FLG BOLT&1/8"FF PHENOLIC GASK SET $1,508.50 $3,017.00 390 8 EA 1-1/8"X3-1/4"304SS CAP SCREWS $10.25 $82.00 400 3 EA 18"300#INSULATED FLG BOLT&1/8"FF PHENOLIC GASK SET $1,265.25 $3,795.75 410 420 CAP EXISTING AIR LINES 1 D 09(2) 430 8 EA 1"GALV COMPRESSION COUPLINGS $14.25 $114.00 440 8 EA 1"x3"GALV TOE NIPPLE $5.75 $46.00 450 8 EA 1"GALV THREADED CAP $2.50 $20.00 460 PROJECT NAME:MARY RHODES PIPELINE PHASE I SYSTEM IMPROVEMENTS-REBID PAGE 2 DATE OF LETTING:JULY 24TH,2024 @ 14:00 PROJECT ENGINEER:HDR LINE QUANTITY UOM DESCRIPTION UNIT PRICE EXTEND PRICE ITEM TOTAL 470 480 CONTINUED 490 2"DRAIN LINE 500 1 EA 2"X4"304SS NIPPLE $15.60 $15.60 510 1 EA 2"304SS THREADED BALL VALVE $115.65 $115.65 520 1 EA 2"SCH80 PVC MALE ADAPTER $18.15 $18.15 530 20 FT 2"SCH80 P.E.PVC PIPE $4.20 $84.00 540 4 EA 2"SCH80 PVC 90 HXH $18.50 $74.00 550 NO DETAILS 560 570 V208-V211 580 8 EA 18"INSULATED FLG BOLT&1/8"FF PHENOLIC GASK SET $1,265.25 $10,122.00 590 600 DEMOLITION 610 1 EA 30"FLG BOLT&1/8"FLG BOLT&GASK SET $280.75 $280.75 620 1 EA 24"FLG BOLT&1/8"FLG BOLT&GASK SET $215.50 $215.50 630 640 1 WA ESTIMATED FREIGHT TO JOBSITE $1,000.00 $1,000.00 650 $72,306.60 660 670 CUSTOMER NAME: 680 QUOTE ACCEPTED BY: 690 DATE: 700 710 *«************«***«*****«««*NOTE***«****«*««**«***««***«*** 720 1.FABRICATED STEEL PIPE AND FITTINGS ARE SPECIAL 730 ORDER,NON-CANCELLABLE,NON-RETURNABLE. 740 2.VALVES,EMOS AND APPURTENANCES ARE 750 SPECIAL ORDER.NON-CANCELLABLE,NON-RETURNABLE. 760 3.BOLTS SETS INCLUDE DOUBLE WASHERS. 770 NOTE 1.PIPE PRICES ARE FIRM FOR ACCEPTANCE WITHIN 15 DAYS AND SHIPMENT WITHIN 30 DAYS OF LETTING.AFTER 15 AND 30 DAYS,PRICES ARE SUBJECT TO MARKET VALUES. 2,THE BALANCE OF PRICES ARE FIRM FOR 30 DAYS. 3.MATERIALS ARE TO BE SHIPPED IN TRUCKLOAD QUANTITIES TO THE PROJECT SITE.LESS THAN TRUCK LOAD QUANTITIES MAY/WILL BE SUBJECT TO FREIGHT CHARGES. 4.ITEMS NOT LISTED ARE NOT QUOTED. 5.ALL MATERIAL QUOTATIONS ARE SUBJECT TO STALINE WATERWORKS,INC. CREDIT POLICIES AND GENERAL TERMS AND CONDITIONS. 7.PIPE PRICES ARE EXPECTED TO INCREASE APPROXIMATELY 5-10% PER MONTH THROUGH SUMMER. 8.PRICES CONTAINED HEREIN ARE CONTINGENT UPON AN ORDER FOR THE COMPLETE PROJECT AS QUOTED.ANY DELETIONS OR SUBSTITUTIONS MAYIWILL ADJUST THE SALE PRICE OF MATERIALS TO THE CUSTOMER. 9.A FUEL SURCHARGE WILL BE ADDED TO THE PRICE OF COMMODITIES WHEN APPLICABLE. 10.AS PER THE TERMS AND CONDITIONS OF THE MANUFACTURER'S STALINE WATERWORKS,INC.REPRESENT,ORDER RELEASES ARE SUBJECT TO"PRICE IN EFFECT AT THE TIME OF SHIPMENT". 13.STEEL AND STAINLESS STEEL PRICES ARE FIRM FOR 7 DAYS. 14.UNLESS OTHERWISE NOTED,MATERIALS MAY BE OF NON-DOMESTIC MANUFACTURE. PLEASE ADVISE AS TO IF THIS PROJECT IS D.O.D.OR A.R.R.A.FUNDED. 15.ALL AWWA BRASS SERVICE FITTINGS ARE NSF61 COMPLIANT, 16.THERE WILL BE A$250.00 SUBMITTAL DATA FEE ACCESSED FOR SAME IF REQUIRED. 17.RAW MATERIAL COSTS ARE PROJECTED TO RISE EXPONENTIALLY IN 2024. ALL MATERIALS MUST BE ORDERED BEFORE THE PRICE EXPIRATION DATE ON THIS QUOTATION. 18.MATERIAL SAFETY DATA SHEETS ARE AVAILABLE AND FURNISHED UPON REQUEST. 19.DELAYS IN EXCESS OF OVER ONE HOUR FOR UNLOADING TRUCKS AT A JOBSITE WILL INCUR A $250.00 PER HOUR FEE,BILLABLE IN QUARTER HOUR INCREMENTS. 20.MATERIALS RETURNED FOR CREDIT MUST HAVE BEEN PURCHASED WITHIN THE PRECEEDING 12 MONTH PERIOD. 21.BECAUSE OF UNCERTAINTIES IN THE MARKET PLACE AND DUE TO THE POSSIBILITY OF INCREASED TARRIFS ON METALS,DUCTILE IRON PRODUCTS ARE FIRM FOR ACCEPTANCE AND DELIVERY IN 30 DAYS.THESE PRODUCTS INCLUDE,BUT ARE NOT LIMITED TO:DUCTILE IRON&STEEL PIPE AND FITTINGS,RESTRAINTS,VALVES.FIRE HYDRANTS,CASTINGS,ETC.. 18594 US Hwy. 59 1 New Caney, Texas 77357 Phone: 281-399-9400 Fax: 281-399-4901 Pump Solutions THIS TRANSMITTAL CONSISTS OF—1—PAGE(S) INCLUDING THIS PAGE. TO: Daryl Dressman—H&S FROM: Josh Mizell DATE: 0 2 /04/2025 RE: Corpus Christi Mary Rhodes Pipeline—ADDITIONAL PUMP Pump Solutions Inc., is pleased to offer the following equipment for the subject project: Corpus Christi Mary Rhodes Pipeline Patterson Pump and Accessories Qty. 1 Patterson model 20x18 MABS single stage horizontal split case pump rated at 12,500 GPM @ 262 FT TDH at 1180 RPM with the following features: • Materials of Construction: • Case: Cast Iron -ASTM A48 Class 40 • Case Rings: ASTM B505-954. • Impeller: ASTM B148-C95200 • Impeller Rings Aluminum Bronze —ASTM B505-958 • Shaft: Stainless Steel 416 • Shaft Sleeves: Aluminum Bronze -ASTM B505-954 • Drip Rim Base/Coupling/ Guard • Sealing: Packing • Motor: 1250 HP, 1200 RPM Motor (TEFC enclosure, 4160/3/60) • Testing: Unwitnessed Complete Test and Routine Test • Test: Unwitnessed Hydro and Performance • Accessories • 1 x Anchor Bolt Template • 1 x Set of Anchor Bolts • 1 x Set of Bearing RTD's • 1 x Lot of Vibration Equipment • 2300 VIBRATION MONITOR (4-20mA) • ACCEL, TOP EXIT, 100 mV/g, Zone 2 • VLMTR CT TWO WIRE CABLE • Spares • 1 x Set of Shaft Sleeves • 1 x Set of O-Rings • 1 x Set of Pump Bearings • 1 x Set of Impeller Rings • 1 x Set of Case Rings • 1 x Set of Gaskets • Special Calculations 0 1 x Lot of Level 2 Analysis by MSI Signature: Sa� ��Gll?�fLl?�IOL fL� S—h B—k-h-fer(A pr3,202 0939 CDT) Email: sarahb@cctexas.com E13037 Change Order 1 Final Audit Report 2025-04-03 Created: 2025-04-03 By: Jana Rodriguez Qanar@cctexas.com) Status: Signed Transaction ID: CBJCHBCAABAACKDXtr3PULgYcDSMDDbkSAK-jHeg03kp "E13037 Change Order 1 " History Document created by Jana Rodriguez Qanar@cctexas.com) 2025-04-03-2:20:01 PM GMT Document emailed to Sarah Brunkenhoefer(sarahb@cctexas.com) for signature 2025-04-03-2:20:16 PM GMT Email viewed by Sarah Brunkenhoefer(sarahb@cctexas.com) 2025-04-03-2:34:43 PM GMT Document e-signed by Sarah Brunkenhoefer(sarahb@cctexas.com) Signature Date:2025-04-03-2:39:57 PM GMT-Time Source:server Document emailed to Stephanie Box(stephanieb2@cctexas.com) for signature 2025-04-03-2:40:01 PM GMT Email viewed by Stephanie Box(stephanieb2@cctexas.com) 2025-04-03-3:06:39 PM GMT Signer Stephanie Box(stephanieb2@cctexas.com) entered name at signing as Stephanie Box for 2025-04-03-3:09:19 PM GMT Document e-signed by Stephanie Box for(stephanieb2@cctexas.com) Signature Date:2025-04-03-3:09:21 PM GMT-Time Source:server Agreement completed. 2025-04-03-3:09:21 PM GMT Adobe Acrobat Sign