Loading...
HomeMy WebLinkAboutM1993-082 - 03/09/1993Motions - 3/9/93 o Motion authorizing Amendment No. 2 to the Contract for Engineering Services with Bass and Welsh Engineering for the Northwest Area Water Distribution System in the amount of $37,800 for Design and Construction Phase Services associated with the installation of a diesel powered generator for emergency power to the pumps at the Cunningham Plant and a computer system to monitor and control the programmable logic controllers which, in turn, control the pumps, valves, and generator. M93-082