kc CONTRACT DOCUMENTS FOR CONSTRUCTION OF TAXIWAY ECHO REHABILITATION CITY PROJECT NO. 26122 AIP No. 3-48-0051-073-2026 3755 S. Capital of Texas Highway, Suite 325, Austin, TX, 78704, 512-485-00009 July 13, 2026 Record Drawing Number: AP-163 PAGE INTENTIONALLY LEFT BLANK 000100 TABLE OF CONTENTS Division/ Title Section Division 00 Preface Documents 00 00 00 Cover Sheet 00 01 00 Table of Contents(Rev 2-2026) 00 01 01 Seals Page (Optional) 00 01 02 List of Drawings Division 00 Procurement and Contracting Requirements 00 52 23 Agreement (Rev 12-2021) 00 72 00 General Conditions(Rev6-2021) 00 73 00 Supplementary Conditions(Rev4-2022) 00 74 00 Special Conditions for Federal Aviation Administration (Rev 10-2018) 00 74 01 FAA General Provisions 00 74 02 FAA Special Provisions Division 01 General Requirements 01 11 00 Summary of Work(Rev 10-2018) 01 23 10 Alternates and Allowances(Rev 5-2020) 01 29 01 Measurement and Basis for Payment (Rev 2-2026) 01 33 01 Submittal Register(Rev 10-2018) 01 35 00 Special Procedures(Rev 10-2018) 01 50 00 Temporary Facilities and Controls(Revs-2019) 01 57 00 Temporary Controls(Revs-2019) Supplemental Specification SS-101 Safety Plan Compliance Document (SPCD) SS-120 Construction Safety and Security SS-220 Ditch Grading SS-221 Geotextile Interlayer for Bituminous Pavement Overlays SS-300 Basic Electrical Requirements SS-301 Electrical Demolition and Relocation Work SS-310 Airport Lighting Systems Table of Contents 00 0100- 1 CCIA Taxiway Echo Rehabilitation Rev 2/2026 Project No: 26122 Division/ Title Section FAA Standard Specifications C-100 Contractor Quality Control Program (CQCP) C-110 Method of Estimating Percentage of Material Within Specification Limits (PWL) P-101 Preparation/Removal of Existing Pavements P-152 Excavation, Subgrade, and Embankment P-401 Asphalt Mix Pavement P-603 Emulsified Asphalt Tack Coat P-620 Runway and Taxiway Marking T-901 Seeding T-904 Sodding T-905 Topsoil L-108 Underground Power Cable for Airports L-110 Airport Underground Electrical Duct Banks and Conduits L-125 Installation of Airport Lighting Systems TxDOT Specifications Tx-247 Flexible Base Tx-341 Dense-Graded Hot-Mix Asphalt Tx-462 Concrete Box Culverts and Drains Tx-467 Safety End Treatment Tx-644 Small Roadside Sign Assemblies Appendix All Testing Reports as Applicable 1 Geotechnical Report END OF SECTION Table of Contents 00 0100-2 CCIA Taxiway Echo Rehabilitation Rev 2/2026 Project No: 26122 i � GilGil ert AC R® DATE(MM/DD/YYYY) CERTIFICATE OF LIABILITY INSURANCE 8/19/2026 THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER, IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must have ADDITIONAL INSURED provisions or be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER CONTACT Acrisure South Insurance Services, LLC NAME: Britian Beck 1317 Citizens Blvd _(A&N o.Ext):404-809-2530 (NC,Not:404-809-2531 Leesburg FL 34748 noDRess: bbeck@acrisure.com INSURER(S)AFFORDING COVERAGE NAIC# License#:L122365 INSURER A:Safety National Casualty Corporation 15105 INSURED ANDECOL-07 INSURER B:Indemnity National Insurance Company 18468 Anderson Columbia Co., Inc. P.O. Box 565 INSURER C:Allied World National Assurance Company 10690 Weslaco TX 78599 INSURER D: INSURER E INSURER F: COVERAGES CERTIFICATE NUMBER:505066129 REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. ILTR TYPE OF INSURANCE INSn wvn SUER POLICY NUMBER MM/DD�YV MMIDD�YY LIMITS A X COMMERCIAL GENERAL LIABILITY Y Y GL6676885 5/1/2026 5/1/2027 EACH OCCURRENCE $2,000,000 CLAIMS-MADE lxl OCCUR DAMAGE TO RENTED PREMISES Ea occurrence $300,000 MED EXP(Any one person) $10,000 PERSONAL&ADV INJURY $2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: GENERAL AGGREGATE $4,000,000 POLICYFX] PRO LOC JECT PRODUCTS-COMP/OP AGG $4,000,000 OTHER: $ A AUTOMOBILE LIABILITY Y Y CA 6676886 5/1/2026 5/1/2027 COMBINED SINGLE LIMIT $2,000,000 Ea accident XIANY AUTO BODILY INJURY(Per person) $ OWNED SCHEDULED BODILY INJURY(Per accident) $ AUTED OS ONLY AUTOS X HIR X NON-OWNED PROPERTY DAMAGE $ AUTOS ONLY AUTOS ONLY Per accident A X UMBRELLA LIAB X OCCUR Y Y XEL4069302 5/1/2026 5/1/2027 EACH OCCURRENCE $10,000,000 C X EXCESS LIAB XS0001222 26 5/1/2026 5/1/2027 CLAIMS-MADE 0314-6674 5/1/2026 5/1/2027 AGGREGATE $10,000,000 DED RETENTION$ $ A WORKERS COMPENSATION Y LDC4069301 5/1/2026 5/1/2027 X STATUTE EORH AND EMPLOYERS'LIABILITY Y/N ANYPROPRIETOR/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBEREXCLUE [ NIA (Mandatory in NH) E.L.DISEASE-EA EMPLOYEE $1,000,000 If yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $1,000,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES (ACORD 101,Additional Remarks Schedule,may be attached if more space is required) RE:CCIA Taxiway Echo Rehabilitation Certificate Holder,and anyone contractually required,is included as Additional Insureds as required per written contract with Named Insured.Waiver of Subrogation is granted in favor of Additional Insureds.Coverage above is provided on a primary and non-contributory basis.Umbrella follows form over General,Auto and Employer's Liability. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN ACCORDANCE WITH THE POLICY PROVISIONS. City of Corpus Christi 1201 Leopard St, Corpus Christi TX 78401 AUTHORIZED REPRESENTATIVE )inlfny Irwin @ 1988-2015 ACORD CORPORATION. All rights reserved. ACORD 25(2016/03) The ACORD name and logo are registered marks of ACORD POLICY NUMBER: GL 6676885 COMMERCIAL GENERAL LIABILITY CG20101001 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS - SCHEDULED PERSON OR ORGANIZATION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART SCHEDULE Name of Person or Organization: Any person or organization as required by written contract or agreement that is executed prior to the loss. (If no entry appears above, information required to complete this endorsement will be shown in the Declarations as applicable to this endorsement.) A. Section II —Who Is An Insured is amended to (1) All work, including materials, parts or include as an insured the person or organization equipment furnished in connection with shown in the Schedule, but only with respect to such work, on the project (other than liability arising out of your ongoing operations service, maintenance or repairs) to be performed for that insured. performed by or on behalf of the B. With respect to the insurance afforded to these additional insured(s) at the site of the additional insureds, the following exclusion is covered operations has been completed; added: or 2. Exclusions (2) That portion of"your work" out of which the injury or damage arises has been put This insurance does not apply to "bodily injury" or"property dama e"occurring after: to its intended use by any person or g g organization other than another contractor or subcontractor engaged in performing operations for a principal as a part of the same project. CG 20 10 10 01 ©ISO Properties, Inc., 2000 Page 1 of 1 POLICY NUMBER: GL 6676885 COMMERCIAL GENERAL LIABILITY CG 20 37 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. ADDITIONAL INSURED - OWNERS, LESSEES OR CONTRACTORS COMPLETED OPERATIONS This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Name Of Additional Insured Person(s) Location And Description Of Completed Or Or anization s Operations Any person or organization as required All of your projects. by written contract or agreement that is executed prior to the loss. Information required to complete this Schedule if not shown above will be shown in the Declarations. A. Section II —Who Is An Insured is amended to B. With respect to the insurance afforded to these include as an additional insured the person(s) or additional insureds, the following is added to organization(s) shown in the Schedule, but only Section III—Limits Of Insurance: with respect to liability for "bodily injury" or If coverage provided to the additional insured is "property damage" caused, in whole or in part, required by a contract or agreement, the most by "your work" at the location designated and we will pay on behalf of the additional insured is described in the Schedule of this endorsement the amount of insurance: performed for that additional insured and included in the "products-completed operations 1. Required by the contract or agreement;or hazard". 2. Available under the applicable limits of However: insurance; 1. The insurance afforded to such additional whichever is less. insured only applies to the extent permitted This endorsement shall not increase the by law; and applicable limits of insurance. 2. If coverage provided to the additional insured is required by a contract or agreement, the insurance afforded to such additional insured will not be broader than that which you are required by the contract or agreement to provide for such additional insured. CG 20 37 12 19 ©Insurance Services Office, Inc., 2018 Page 1 of 1 POLICY NUMBER: GL 6676885 COMMERCIAL GENERAL LIABILITY CG 02 24 10 93 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. EARLIER NOTICE OF CANCELLATION PROVIDED BY US This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART SCHEDULE Number of Days' Notice 90 days except 10 days' notice for non-payment of premium where allowed by state law. (If no entry appears above, information required to complete this Schedule will be shown in the Declarations as applicable to this endorsement.) For any statutorily permitted reason other than nonpayment of premium, the number of days required for notice of cancellation, as provided in paragraph 2. of either the CANCELLATION Common Policy Condition or as amended by an applicable state cancellation endorsement, is increased to the number of days shown in the Schedule above. CG 02 24 10 93 Copyright, Insurance Services Office, Inc., 1992 Page 1 of 1 POLICY NUMBER: GL 6676885 COMMERCIAL GENERAL LIABILITY CG 20 01 12 19 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. PRIMARY AND NONCONTRIBUTORY - OTHER INSURANCE CONDITION This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART The following is added to the Other Insurance (2) You have agreed in writing in a contract or Condition and supersedes any provision to the agreement that this insurance would be contrary: primary and would not seek contribution Primary And Noncontributory Insurance from any other insurance available to the additional insured. This insurance is primary to and will not seek contribution from any other insurance available to an additional insured under your policy provided that: (1) The additional insured is a Named Insured under such other insurance; and CG 20 01 12 19 ©Insurance Services Office, Inc., 2018 Page 1 of 1 POLICY NUMBER: GL 6676885 COMMERCIAL GENERAL LIABILITY CG24041219 THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY. WAIVER OF TRANSFER OF RIGHTS OF RECOVERY AGAINST OTHERS TO US (WAIVER OF SUBROGATION) This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART ELECTRONIC DATA LIABILITY COVERAGE PART LIQUOR LIABILITY COVERAGE PART POLLUTION LIABILITY COVERAGE PART DESIGNATED SITES POLLUTION LIABILITY LIMITED COVERAGE PART DESIGNATED SITES PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART RAILROAD PROTECTIVE LIABILITY COVERAGE PART UNDERGROUND STORAGE TANK POLICY DESIGNATED TANKS SCHEDULE Name Of Person(s)Or Organization(s): Any Person or Organization as required by written contract or agreement that is executed prior to the loss. Information required to complete this Schedule if not shown above will be shown in the Declarations. The following is added to Paragraph 8. Transfer Of Rights Of Recovery Against Others To Us of Section IV—Conditions: We waive any right of recovery against the person(s) or organization(s) shown in the Schedule above because of payments we make under this Coverage Part. Such waiver by us applies only to the extent that the insured has waived its right of recovery against such person(s) or organization(s) prior to loss. This endorsement applies only to the person(s) or organization(s) shown in the Schedule above. CG 24 04 12 19 ©Insurance Services Office, Inc., 2018 Page 1 of 1 WORKERS COMPENSATION AND EMPLOYERS LIABILITY INSURANCE POLICY WC 42 03 04 B TEXAS WAIVER OF OUR RIGHT TO RECOVER FROM OTHERS ENDORSEMENT This endorsement applies only to the insurance provided by the policy because Texas is shown in Item 3.A. of the Information Page. We have the right to recover our payments from anyone liable for an injury covered by this policy. We will not enforce our right against the person or organization named in the Schedule, but this waiver applies only with respect to bodily injury arising out of the operations described in the Schedule where you are required by a written contract to obtain this waiver from us. This endorsement shall not operate directly or indirectly to benefit anyone not named in the Schedule. The premium for this endorsement is shown in the Schedule. SCHEDULE 1. ( ) Specific Waiver (x) Blanket Waiver Any person or organization for whom the Named Insured has agreed by written contract to furnish this waiver. 2. Operations: 3. Premium: $ The premium charge for this endorsement shall be percent of the premium developed on payroll in connection with work performed for the above person(s)or organization(s) arising out of the operations described. 4. Advance Premium: This endorsement changes the policy to which it is attached and is effective on the date issued unless otherwise stated. (The information below is required only when this endorsement is issued subsequent to preparation of the policy.) Endorsement Effective 05/01/2026 Policy No. LDC4069301 Endorsement No. Named Insured ANDERSON COLUMBIA CO. , INC. Premium$ Included Insurance Company Safety National Casualty Corporation Countersigned By WC 42 03 04 B (06 14) ©Copyright 2014 National Council on Compensation Insurance,Inc.All Rights Reserved. 9� Janet Whitehead T: 108524031 00 61 13 PERFORMANCE BOND BOND NO. B: 47-SUR-300124-01-0588 Contractor as Principal Surety Travelers Casualty and Surety Company of America Name:Anderson Columbia Co, Inc, Name: and Berkshire Hathaway Specialty Insurance Company Mailing address (principal place of business): Mailing address(principal place of business): PO BOX 10627 One Tower Square,Hartford,CT 06183 and Corpus Christi, TX 78460 1314 Douglas St.,Ste 1400,Omaha,NE 68102 Physical address (principal place of business): Owner One Tower Square, Hartford,CT 06183 and 1314 Douglas St.,Ste 1400,Omaha, NE 68102 Name: City of Corpus Christi,Texas Mailing address (principal place of business): Engineering Services Surety is a corporation organized and existing 1201 Leopard Street under the laws of the state of: CT/NE Corpus Christi,Texas 78401 — By submitting this Bond,Surety affirms its authority to do business in the State of Texas and Contract its license to execute bonds in the State of Texas. Project name and number: Telephone (main number): CCIA Taxiway Echo Rehabilitation 26122 860-277-0111/800-475-4477 RFB/Contract No. 7239 1 Project No. 26122 Telephone (for notice of claim): 860-277-0111/800-475-4477 Local Agent for Surety Name: Acrisure, LLC Award Date of the Contract:August 11, 2026 Address: 1000 Central Ave. Suite 200 St. Petersburg FL 33705 Contract Price: $1,767,975.00 Telephone: 727-209-1803 Bond Email Address: kwojtowicz@acrisure.com Date of Bond: August 18, 2026 The address of the surety company to which any notice of claim should be sent may be obtained C(Date Bond cannot be earlier than Award Date from the Texas Dept. of Insurance by calling the of the Contract) following toll free number:1-800-252-3439 Performance Bond 00 61 13- 1 Rev 5/2025 CCIA Taxiway Echo Rehabilitation 26122 Surety and Contractor, intending to be legally bound and obligated to Owner do each cause this Performance Bond to be duly executed on its behalf by its authorized officer, agent or representative. The Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns,jointly and severally to this bond. The condition of this obligation is such that if the Contractor as Principal faithfully performs the Work through the Warranty Period required by the Contract Documents then this obligation shall be null and void;otherwise the obligation is to remain in full force and effect. The Contract Documents between Owner and Contractor is incorporated by reference into this Statutory Performance Bond,pursuant to Chapter 2253 of the Texas Government Code. Provisions of the bond shall be pursuant to the terms and provisions of Chapter 2253 and Chapter 2269 of the Texas Government Code, as amended, and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter to the same extent as if it were copied at length herein. Venue shall lie exclusively in Nueces County, Texas. Surety agrees to be bound by the mediation clause in Article 22 of the Contract Documents between Owner and Contractor, said Contract Documents are incorporated by reference in this Bond. Contractor as Princip I Ander on lu bia Co., Inc. Surety Travelers Casualty and Surety Company of Ameri a and Berkshire Hathaw ecialty Insurance C onipany Signature: Signature: Name: bA&A.) CW1\VA- Name: Kevin R.Wojtowicz Title: Attorney-in-Fact& Title: p TX Licensed Non-Resident Agent Email Address: Email Address: kwojtowicz@acrisure.com (Attach Power of Attorney and place surety seal below) END OF SECTION Performance Bond 00 61 13-2 Rev 5/2025 CCIA Taxiway Echo Rehabilitation 26122 9� Janet Whitehead T: 108524031 00 61 16 PAYMENT BOND BOND NO. B: 47-SUR-300124-01-0588 Contractor as Principal Surety Name: Name; Travelers Casualty and Surety Company of America Anderson Columbia Co, Inc. and Berkshire Hathaway Specialty Insurance Company Mailing address (principal place of business): Mailing address(principal place of business): PO Box 10627 One Tower Square, Hartford, CT 06183 and Corpus Christi, TX 78460 1314 Douglas St., Ste 1400, Omaha, NE 68102 Physical address (principal place of business): Owner One Tower Square, Hartford, CT 06183 and 1314 Douglas St., Ste 1400, Omaha, NE 68102 Name: City of Corpus Christi,Texas Mailing address(principal place of business): Engineering Services Surety is a corporation organized and existing 1201 Leopard Street under the laws of the state of: CT/NE Corpus Christi,Texas 78401 By submitting this Bond, Surety affirms its authority to do business in the State of Texas and Contract its license to execute bonds in the State of Texas. Project name and number: Telephone (main number): CCIA Taxiway Echo Rehabilitation 26122 860-277-0111/800-475-4477 RFB/Contract No. 7239 1 Project No. 26122 Telephone (for notice of claim): 860-277-0111/800-475-4477 Local Agent for Surety Name: Acrisure, LLC Award Date of the Contract: August 11, 2026 Address: 1000 Central Ave. Suite 200 Contract Price:$1,767,975.00 St. Petersburg FL 33705 Bond Telephone: 727-209-1803 Email Address: kwojtowicz@acrisure.com Date of Bond: August 18, 2026 The address of the surety company to which any (Date of Bond cannot be earlier than Award Date notice of claim should be sent may be obtained of Contract) from the Texas Dept. of Insurance by calling the following toll free number:1-800-252-3439 Payment Bond Form 00 61 16- 1 5/2024 CCIA Taxiway Echo Rehabilitation 26122 Surety and Contractor, intending to be legally bound and obligated to Owner do each cause this Payment Bond to be duly executed on its behalf by its authorized officer, agent or representative. The Principal and Surety bind themselves, and their heirs, administrators, executors, successors and assigns,jointly and severally to this bond. The condition of this obligation is such that if the Contractor as Principal pays all claimants providing labor or materials to him or to a Subcontractor in the prosecution of the Work required by the Contract Documents then this obligation shall be null and void;otherwise the obligation is to remain in full force and effect. Provisions of the bond shall be pursuant to the terms and provisions of Chapter 2253 and Chapter 2269 of the Texas Government Code as amended and all liabilities on this bond shall be determined in accordance with the provisions of said Chapter to the same extent as if it were copied at length herein. Venue shall lie exclusively in Nueces County, Texas for any legal action. Contractor as Principa Anderson Colu bia Co., Inc. Surety Travelers Casualty and Suret Company of America and Berkth<rethaway ped y Insurance Company Signature: Signature: Name: p,,� �11Q 1t` Name: Kevin R. Wojtowicz Title: Title: Attorney-in-Fact& 0 TX Licensed Non-Resident Agent Email Address:di4x* j,��p,,te toyu�k (O'Lti Email Address: kwojtowicz@acrisure.com (Attach Power of Attorney and place surety seal below) END OF SECTION Payment Bond Form 00 61 16-2 5/2024 CCIA Taxiway Echo Rehabilitation 26122 Travelers Casualty and Surety Company of America Travelers Casualty and Surety Company TRAVELERS J St. Paul Fire and Marine Insurance Company POWER OF ATTORNEY KNOW ALL MEN BY THESE PRESENTS: That Travelers Casualty and Surety Company of America, Travelers Casualty and Surety Company, and St. Paul Fire and Marine Insurance Company are corporations duly organized under the laws of the State of Connecticut (herein collectively called the"Companies"),and that the Companies do hereby make,constitute and appoint KEVIN R WOJTOWICZ of ST PETERSBURG . Florida , their true and lawful Attorney(s)-in-Fact to sign, execute, seal and acknowledge any and all bonds, recognizances, conditional undertakings and other writings obligatory in the nature thereof on behalf of the Companies in their business of guaranteeing the fidelity of persons, guaranteeing the performance of contracts and executing or guaranteeing bonds and undertakings required or permitted in any actions or proceedings allowed by law. IN WITNESS WHEREOF,the Companies have caused this instrument to be signed, and their corporate seals to be hereto affixed, this 21st day of April, 2021. ►1a..�. ` tY A/y 3JP` S HQRTFtl 'S W F \l,, WIATF N. �p67i1;'t CONN. State of Connecticut � By: 04 City of Hartford ss. Robert L.RaneySenior Vice President On this the 21st day of April, 2021, before me personally appeared Robert L. Raney, who acknowledged himself to be the Senior Vice President of each of the Companies, and that he, as such, being authorized so to do, executed the foregoing instrument for the purposes therein contained by signing on behalf of said Companies by himself as a duly authorized officer. 'e �2 Np;',•r IN WITNESS WHEREOF, I hereunto set my hand and official seal. i a )-5/GG� My Commission expires the 30th day of June,2026 o+.Y /�Z L� ru"10 Anna P. Nowik, Notary Public v,).ECT1r� This Power of Attorney is granted under and by the authority of the following resolutions adopted by the Boards of Directors of each of the Companies,which resolutions are now in full force and effect,reading as follows: RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President, any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary may appoint Attorneys-in-Fact and Agents to act for and on behalf of the Company and may give such appointee such authority as his or her certificate of authority may prescribe to sign with the Company's name and seal with the Company's seal bonds, recognizances, contracts of indemnity, and other writings obligatory in the nature of a bond, recognizance, or conditional undertaking, and any of said officers or the Board of Directors at any time may remove any such appointee and revoke the power given him or her;and it is FURTHER RESOLVED, that the Chairman, the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President may delegate all or any part of the foregoing authority to one or more officers or employees of this Company, provided that each such delegation is in writing and a copy thereof is filed in the office of the Secretary;and it is FURTHER RESOLVED, that any bond, recognizance, contract of indemnity, or writing obligatory in the nature of a bond, recognizance, or conditional undertaking shall be valid and binding upon the Company when (a) signed by the President, any Vice Chairman, any Executive Vice President, any Senior Vice President or any Vice President, any Second Vice President, the Treasurer, any Assistant Treasurer, the Corporate Secretary or any Assistant Secretary and duly attested and sealed with the Company's seal by a Secretary or Assistant Secretary; or (b) duly executed (under seal, if required) by one or more Attorneys-in-Fact and Agents pursuant to the power prescribed in his or her certificate or their certificates of authority or by one or more Company officers pursuant to a written delegation of authority;and it is FURTHER RESOLVED, that the signature of each of the following officers: President, any Executive Vice President, any Senior Vice President, any Vice President, any Assistant Vice President, any Secretary, any Assistant Secretary, and the seal of the Company may be affixed by facsimile to any Power of Attorney or to any certificate relating thereto appointing Resident Vice Presidents, Resident Assistant Secretaries or Attorneys-in- Fact for purposes only of executing and attesting bonds and undertakings and other writings obligatory in the nature thereof, and any such Power of Attorney or certificate bearing such facsimile signature or facsimile seal shall be valid and binding upon the Company and any such power so executed and certified by such facsimile signature and facsimile seal shall be valid and binding on the Company in the future with respect to any bond or understanding to which it is attached. I, Kevin E. Hughes, the undersigned, Assistant Secretary of each of the Companies, do hereby certify that the above and foregoing is a true and correct copy of the Power of Attorney executed by said Companies,which remains in full force and effect. Dated this 18th day of August 2026 �H4R�TF0R'1, 3 W HMTFORD, � � Cart Kevin E. Hughes,Assistant Secretary To verify the authenticity of this Power of Attorney,please call us at 1-800-411-3880. Please refer to the above-named Attorneys)-in-Fact and the details of the bond to which this Powerof Attorney is attached. 47-SUR-300124-01-0588 BERKSHIRE HATHAWAY SPECIALTY INSURANCE 6 c3 Power Of,Attorney BERKSHIRE HATHAWAY SPECIALTY INSURANCE COMPANY w NATIONAL INDEMNITY COMPANY/NATIONAL LIABILITY&FIRE INSURANCE COMPANY Know all men by these presents,that BERKSHIRE HATHAWAY SPECIALTY INSURANCE COMPANY and NATIONAL INDEMNITY � COMPANY.corporation existing under and by virtue of the laws of the State of Nebraska, and NATIONAL LIABILITY&FIRE U. INSURANCE COMPANY a corporation existing under and by virtue of the laws of the State of Connecticut (hereinafter Q collectively the"Companies'),pursuant to and by the authority granted as set forth herein,do hereby name,constitute and appoint Kevin R.Woitowicz located at 1000 Central Avenue,Suite 200 of the city of St.Petersburg,State of Florida as their A true and lawful attorney(s)-in-fact to make,execute,seal,acknowledge,and deliver,for and on their behalf as surety and as E their act and deed,any and all undertakings,bonds,bid related commitments to include surety consents,surety consents for U release or reduction of retained percentages,final estimates on engineering and construction contracts or other such writings obligatory in the nature thereof,in pursuance of these presents,the execution of which shall be as binding upon the Companies T p as if it has been duly signed and executed by their regularly elected officers in their own proper persons.This authority for e LU the Attorney-in-Fact shall be limited to the execution of the attached bond(s)or other such related writings obligatory in a ' the nature thereof as described herein. E WCL W In witness whereof,this Power of Attorney has been subscribed by an authorized officer of the Companies,and the corporate LA a �; seals of the Companies have been affixed hereto this date 17th of September, 2025, This Power of Attorney is made and Q executed pursuant to and by authority of the Bylaws, Resolutions of the Board of Directors, and other Authorizations m �_ n of BERKSHIRE HATHAWAY SPECIALTY INSURANCE COMPANY,NATIONAL INDEMNITY COMPANY and NATIONAL LIABILITY& r��o M FIRE INSURANCE COMPANY,which are in full force and effect,each reading as appears on the back page of this Power of Attorney,respectively.The following seals of the Companies and signatures by authorized officer of the Companies may be E O x affixed by facsimile or digital format,which shall be deemed the equivalent of and constitute the written signatures of such Y officer of the Companies and original seals of the Companies for all purposes regarding this Power of Attorney,including m ,, e satisfaction of any signature and seal requirements on any and all undertakings,bonds,or other such writings obligatory in C O �t the nature thereof,to which this Power of Attorney applies. E w BERKSHIRE HATHAWAY SPECIALTY NATIONAL INDEMNITY COMPANY, a. a, INSURANCE COMPANY, a�-5166",•y�. NATIONAL LIABILITY&FIRE ?�EM�N�r� by 40'.�If`sG vr'•,:�ttl liq`:. L+ < SURETY INSURANCE COMPANY, � SEAL "d`�fB11A5F�J�l� Y�•t• 4� d �yF11E/h \`,� SG L m E --- si. SL'RF.TN' m SEAL c v By. By: `tio°tie ec��:1a� w rl David Fields,Executive Vice President David Fields,Vice President `�� * +' w m �n a. m by NOTARY State of Massachusetts.County of Suffolk,ss: E a � On this 17th day of September,2025 before me appeared David Fields,Executive Vice President of BERKSHIRE HATHAWAY E o SPECIALTY INSURANCE COMPANY and Vice President of NATIONAL INDEMNITY COMPANY and NATIONAL LIABILITY&FIRE o E INSURANCE COMPANY,who being duly sworn,says that his capacity is as designated above for such Companies;that he `a c knows the corporate seals of the Companies;that the seals affixed to the foregoing instrument are such corporate seals; o that they were affixed by order of the board of directors or other governing body of said Companies pursuant to its Bylaws, N Ln tt Resolutions and other Authorizations,and that he signed said instrument in that capacity of said Companies. N [Notary Seal] d 0 s1 CAITLIN NICOLE bOYDlN — Notary Public Comm omvealth of Massachusetts MY COmmisslon Expires M a September 7, 2029 « '� Notary Public I,Ralph Tortorella III,the undersigned,Officer of BERKSHIRE HATHAWAY SPECIALTY INSURANCE COMPANY,NATIONAL INDEMNITY COMPANY and NATIONAL LIABILITY&FIRE INSURANCE COMPANY,do hereby certify that the abov and } foregoing is a true and correct copy of the Power of Attorney executed by said Companies which is in full fo e and has not been revoked.IN TESTIMONY WHEREOF,see hereunto affixed the seals of said Companies this 2026. Ralph Tortorella III,Officer BHSIC, NICO&NLF POA(8 2025) S U �NOORPOR PtE� 1852 00 52 23 AGREEMENT This Agreement, for the Project awarded on August 11, 2026, is between the City of Corpus Christi (Owner) and Anderson Columbia Co, Inc. (Contractor). Owner and Contractor agree as follows: ARTICLE 1—WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as: CCIA Taxiway Echo Rehabilitation Project No: 26122 ARTICLE 2—DESIGNER AND OWNER'S AUTHORIZED REPRESENTATIVE 2.01 The Project has been designed by: Garver 3755 S. Capital of Texas Highway,Suite#325 Austin,Texas 78704 PJHuntley@GarverUSA.com 2.02 The Owner's Authorized Representative for this Project is: Joseph Johnson—Assistant Director of Engineering Construction Management 1201 Leopard Drive Corpus Christi,Texas,78401 JosephJ2@CorpusChristiTX.gov ARTICLE 3—CONTRACT TIMES 3.01 Contract Times A. The Work is required to be substantially completed within 90 days after the date when the Contract Times commence to run as provided in the Notice to Proceed and is to be completed and ready for final payment in accordance with Paragraph 17.16 of the General Conditions within 120 days after the date when the Contract Times commence to run. B. Performance of the Work is required as shown in Paragraph 7.02 of the General Conditions. C. Milestones,and the dates for completion of each,are as defined in Section 0135 00 SPECIAL PROCEDURES. Agreement 00 52 23- 1 CCIA Taxiway Echo Rehabilitation Rev 12/2021 Project No: 26122 3.02 Liquidated Damages A. Owner and Contractor recognize that time limits for specified Milestones, Substantial Completion, and completion and readiness for Final Payment as stated in the Contract Documents are of the essence of the Contract. Owner and Contractor recognize that the Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.01 and as adjusted in accordance with Paragraph 11.05 of the General Conditions. Owner and Contractor also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof, Owner and Contractor agree that as liquidated damages for delay(but not as a penalty): 1. Substantial Completion: Contractor shall pay Owner$1,900.00 for each day that expires after the time specified in Paragraph 3.01 for Substantial Completion until the Work is substantially complete. 2. Completion of the Remaining Work: Contractor agrees to pay Owner$1,900.00 for each day that expires after the time specified in Paragraph 3.01 for completion and readiness for final payment until the Work is completed and ready for final payment in accordance with Paragraph 17.16 of the General Conditions. 3. Liquidated damages for failing to timely attain Substantial Completion and Final Completion are not additive and will not be imposed concurrently. 4. Milestones: Contractor agrees to pay Owner liquidated damages as stipulated in SECTION 0135 00 SPECIAL PROCEDURES for failure to meet Milestone completions. 5. The Owner will determine whether the Work has been completed within the Contract Times. B. Owner is not required to only assess liquidated damages, and Owner may elect to pursue its actual damages resulting from the failure of Contractor to complete the Work in accordance with the requirements of the Contract Documents. ARTICLE 4—CONTRACT PRICE 4.01 Owner will pay Contractor for completion of the Work in accordance with the Contract Documents at the unit prices shown in the attached BID FORM. Unit prices have been computed in accordance with Paragraph 15.03 of the General Conditions. Contractor acknowledges that estimated quantities are not guaranteed, and were solely for the purpose of comparing Bids, and final payment for all unit price items will be based on actual quantities, determined as provided in the Contract Documents. Total Base Bid Price $ 1,435,390.00 Total Base Bid + Additive Alternate 1 Price $ 1,767,975.00 Agreement 00 52 23-2 CCIA Taxiway Echo Rehabilitation Rev 12/2021 Project No: 26122 ARTICLE 5—PAYMENT PROCEDURES 5.01 Submit Applications for Payment in accordance with Article 17 of the General Conditions. Applications for Payment will be processed by the OAR as provided in the General Conditions. 5.02 Progress Payments; Retainage: A. The Owner will make progress payments on or about the 25th day of each month during performance of the Work. Payment is based on Work completed in accordance with the Schedule of Values established as provided in the General Conditions. B. Progress payments equal to the full amount of the total earned value to date for completed Work minus the retainage listed below and properly stored materials will be made prior to Substantial Completion. 1. The standard retainage is 10 percent. C. Payment will be made for the amount determined per Paragraph 5.02.13, less the total of payments previously made and less set-offs determined in accordance with Paragraph 17.01 of the General Conditions. D. At the Owner's option, Owner may pay Contractor 100 percent of the Work completed, less amounts withheld in accordance with Paragraph 17.01 of the General Conditions and less 200 percent of OAR's estimate of the value of Work to be completed or corrected to reach Substantial Completion. Owner may, at its sole discretion, elect to hold retainage in the amounts set forth above for progress payments prior to Substantial Completion if Owner has concerns with the ability of the Contractor to complete the remaining Work in accordance with the Contract Documents or within the time frame established by this Agreement. Release or reduction in retainage is contingent upon and consent of surety to the reduction in retainage. 5.03 Owner will pay the remainder of the Contract Price as recommended by OAR in accordance with Paragraph 17.16 of the General Conditions upon Final Completion and acceptance of the Work. ARTICLE 6—INTEREST ON OVERDUE PAYMENTS AND RETAINAGE 6.01 The Owner is not obligated to pay interest on overdue payments except as required by Texas Government Code Chapter 2251. Invoices must comply with Article 17 of the General Conditions. 6.02 Except as specified in Article 5, the Owner is not obligated to pay interest on moneys not paid except as provided in Texas Government Code Chapter 2252. ARTICLE 7—CONTRACTOR'S REPRESENTATIONS 7.01 The Contractor makes the following representations: A. The Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. The Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. Agreement 00 52 23-3 CCIA Taxiway Echo Rehabilitation Rev 12/2021 Project No: 26122 C. The Contractor is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work. D. The Contractor has carefully studied the following Site-related reports and drawings as identified in the Supplementary Conditions: 1. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; 2. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; 3. Underground Facilities referenced in reports and drawings; 4. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and 5. Technical Data related to each of these reports and drawings. E. The Contractor has considered the: 1. Information known to Contractor; 2. Information commonly known to contractors doing business in the locality of the Site; 3. Information and observations obtained from visits to the Site; and 4. The Contract Documents. F. The Contractor has considered the items identified in Paragraphs 7.01.D and 7.01.E with respect to the effect of such information, observations, and documents on: 1. The cost, progress, and performance of the Work; 2. The means, methods, techniques, sequences, and procedures of construction to be employed by Contractor; and 3. Contractor's safety precautions and programs. G. Based on the information and observations referred to in the preceding paragraphs, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. H. The Contractor is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. I. The Contractor has correlated the information known to the Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations,tests, studies, and data with the Contract Documents. J. The Contractor has given the OAR written notice of all conflicts, errors, ambiguities, or discrepancies that the Contractor has discovered in the Contract Documents,and the written resolution provided by the OAR is acceptable to the Contractor. K. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. Agreement 00 52 23-4 MA Taxiway Echo Rehabilitation Rev 12/2021 Project No: 26122 L. Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. M. CONTRACTOR SHALL INDEMNIFY, DEFEND AND HOLD HARMLESS THE OWNER'S INDEMNITEES IN ACCORDANCE WITH PARAGRAPH 7.14 OF THE GENERAL CONDITIONS AND THE SUPPLEMENTARY CONDITIONS. ARTICLE 8—ACCOUNTING RECORDS 8.01 Accounting Record Availability: The Contractor shall keep such full and detailed accounts of materials incorporated and labor and equipment utilized for the Work consistent with the requirements of Paragraph 15.01 of the General Conditions and as may be necessary for proper financial management under this Agreement. Subject to prior written notice,the Owner shall be afforded reasonable access during normal business hours to all of the Contractor's records, books, correspondence, instructions,drawings, receipts,vouchers,memoranda,and similar data relating to the Cost of the Work and the Contractor's fee. The Contractor shall preserve all such documents for a period of 3 years after the final payment by the Owner. ARTICLE 9—CONTRACT DOCUMENTS 9.01 Contents: A. The Contract Documents consist of the following: 1. Solicitation documents. 2. Specifications,forms, and documents listed in SECTION 00 0100 TABLE OF CONTENTS. 3. Drawings listed in the Sheet Index. 4. Addenda. 5. Exhibits to this Agreement: a. Contractor's Bid Form. 6. Documentation required by the Contract Documents and submitted by Contractor prior to Notice of Award. B. There are no Contract Documents other than those listed above in this Article. C. The Contract Documents may only be amended, modified, or supplemented as provided in Article 11 of the General Conditions. ARTICLE 10—CONTRACT DOCUMENT SIGNATURES (SIGNATURE PAGE FOLLOWS) Agreement 00 52 23-5 CCIA Taxiway Echo Rehabilitation Rev 12/2021 Project No: 26122 ATTEST CITY OF CORPUS CHRISTI 2� Jeff Edmonds(Aug 26,2026 08:39:27 CDT) Rebecca Huerta Jeffrey Edmonds, P.E City Secretary Director of Engineering Services M2026-082 AUTHORIZED APPROVED AS TO LEGAL FORM: BY COUNCIL 8/11/2026 S n� Francis Y5ur400bod(Aug 26,2026 08:16:34 CDT) RH/SB Assistant City Attorney ATTEST(IF CORPORATION) CONTRACTOR Dvew T c0m Drew P.Cullen(Aug 24,2026 14:07:12 CDT) (Seal Below) By: Drew Cullen Note: Attach copy of authorization to sign if Title: Agent person signing for CONTRACTOR is not President Vice President Chief Executive Officer, or Chief PO Box 10627 Financial Officer Address Corpus Christi TX 78460 City State Zip 361-853-2535 Phone Fax TXEST@andersoncolumbia.com Entail END OF SECTION Agreement 00 52 23-6 CCIA Taxiway Echo Rehabilitation Rev 12/2021 Project No: 26122 RFB 7239 CCIA Taxiway Echo Rehabilitation PN.26122 Report Created On:6/24/2026 7:08:35 PM PROJECT: RFB 7239 CCIA Taxiway Echo Rehabilitation PN. 26122 7239 BIDDER: ANDERSON COLUMBIA CO., INC. TOTAL BID: $1,435,390.00 COMPLETION TIME: Not Required BIDDER INFO: 1402 HOLLY RD CORPUS CHRISTI,TX 78417 P: 361-853-2535 F: 361-853-5564 CIVCAS, RFB 7239 CCIA Taxiway Echo Rehabilitation PN.26122 Report Created On:6/24/2026 7:08:35 PM BID TOTALS BASE BID Total Al $20,000.00 A2 $14,340.00 B-1 $200,000.00 B-2 $91,200.00 B-3 $101,920.00 B-4 $48,700.00 B-5 $600.00 B-6 $145,600.00 B-7 $561,600.00 B-8 $159,840.00 B-9 $2,125.00 B-10 $3,135.00 D1 $70,000.00 D2 $14,400.00 D3 $1,930.00 Total $1,435,390.00 ALTERNATE 1 Total SS-300-5.1 $6,800.00 SS-301-5.1 $2,270.00 SS-310-5.1 $6,800.00 TX-247-5.1 $82,800.00 TX-341-5.1 $106,200.00 TX-462-5.1 $38,500.00 TX-467-5.1 $41,000.00 TX-644-5.1 $1,420.00 P-152-5.1 $6,600.00 P-152-5.2 $15,400.00 CIVCAST RFB 7239 CCIA Taxiway Echo Rehabilitation PN.26122 Report Created On:6/24/2026 7:08:35 PM P-620-5.1 $75.00 T-901-5.1 $3,000.00 L-108-5.1 $1,100.00 L-108-5.2 $1,100.00 L-110-5.1 $9,600.00 L-125-5.1 $9,920.00 Total $332,585.00 Al No. Description Unit Qty Unit Price Ext Price 01 2901 STORM WATER POLLUTION LS 1 $20,000.00 $20,000.00 PREVENTION Subtotal: $20,000.00 A2 No. Description Unit Qty Unit Price Ext Price 01 5700 OZONE ADVISORY DAYS DAY 2 $7,170.00 $14,340.00 Subtotal: $14,340.00 B-1 No. Description Unit Qty Unit Price Ext Price SS-120-3.1 CONSTRUCTION SAFETY AND SECURITY LS 1 $200,000.00 $200,000.00 Subtotal: $200,000.00 B-2 No. Description Unit Qty Unit Price Ext Price SS-220-5.1 DITCH GRADING LF 1200 $76.00 $91,200.00 Subtotal: $91,200.00 B-3 No. Description Unit Qty Unit Price Ext Price SS-221-5.1 PAVING FABRIC SY 18200 $5.60 $101,920.00 CIVCAST RFB 7239 CCIA Taxiway Echo Rehabilitation PN.26122 Report Created On:6/24/2026 7:08:35 PM Subtotal: $101,920.00 B-4 No. Description Unit Qty Unit Price Ext Price C-100-14.1 CONTRACTOR QUALITY CONTROL LS 1 $48,700.00 $48,700.00 PROGRAM (CQCP) Subtotal: $48,700.00 B-5 No. Description Unit Qty Unit Price Ext Price P-101-5.1 PAVEMENT MARKINGS REMOVAL SF 1500 $0.40 $600.00 Subtotal: $600.00 B-6 No. Description Unit Qty Unit Price Ext Price P-101-5.2 COLD MILLING(2" DEPTH) SY 18200 $8.00 $145,600.00 Subtotal: $145,600.00 B-7 No. Description Unit Qty Unit Price Ext Price P-401-8.1 2"ASPHALT SURFACE COURSE TN 2600 $216.00 $561,600.00 Subtotal: $561,600.00 B-8 No. Description Unit Qty Unit Price Ext Price P-401-8.2 VARIABLE DEPTH ASPHALT BASE TN 740 $216.00 $159,840.00 COURSE Subtotal: $159,840.00 B-9 No. Description Unit Qty Unit Price Ext Price P-620-5.1 REFLECTIVE AIRFIELD PAVEMENT SF 1700 $1.25 $2,125.00 MARKING Subtotal:$2,125.00 CIVCAST RFB 7239 CCIA Taxiway Echo Rehabilitation PN.26122 Report Created On:6/24/2026 7:08:35 PM B-10 No. Description Unit Qty Unit Price Ext Price P-620-5.2 NON-REFLECTIVE AIRFIELD PAVEMENT SF 3300 $0.95 $3,135.00 MARKING Subtotal:$3,135.00 D1 No. Description Unit Qty Unit Price Ext Price D1 Mobilization (Not to exceed 5% max LS 1 $70,000.00 $70,000.00 multiplied by SUBTOTAL PROJECT BASE BID) Subtotal: $70,000.00 D2 No. Description Unit Qty Unit Price Ext Price D2 Bonds and Insurances (Not to exceed LS 1 $14,400.00 $14,400.00 2% max multiplied by SUBTOTAL PROJECT BASE BID) Subtotal: $14,400.00 D3 No. Description Unit Qty Unit Price Ext Price D3 Owner's Protective Insurance LS 1 $1,930.00 $1,930.00 Subtotal:$1,930.00 SS-300-5.1 No. Description Unit Qty Unit Price Ext Price C1 LOCKOUT/TAGOUT AND CONSTANT LS 1 $6,800.00 $6,800.00 CURRENT REGULATOR CALIBRATION PROCEDURES Subtotal:$6,800.00 SS-301-5.1 No. Description Unit Qty Unit Price Ext Price CIVCAST RFB 7239 CCIA Taxiway Echo Rehabilitation PN.26122 Report Created On:6/24/2026 7:08:35 PM C2 EXISTING L-861TSTAKE MOUNTED EA 1 $2,270.00 $2,270.00 TAXIWAY EDGE LIGHT, REMOVED Subtotal:$2,270.00 SS-310-5.1 No. Description Unit Qty Unit Price Ext Price C3 TEMPORARY AIRFIELD LIGHTING LS 1 $6,800.00 $6,800.00 Subtotal:$6,800.00 TX-247-5.1 No. Description Unit Qty Unit Price Ext Price C4 CRUSHED AGGREGATE BASE COURSE SY 1800 $46.00 $82,800.00 (12"THICK) Subtotal: $82,800.00 TX-341-5.1 No. Description Unit Qty Unit Price Ext Price C5 ASPHALT SURFACE COURSE(TYPED)(6") TONS 600 $177.00 $106,200.00 Subtotal: $106,200.00 TX-462-5.1 No. Description Unit Qty Unit Price Ext Price C6 5'X 3' REINFORCED CONCRETE BOX LF 50 $770.00 $38,500.00 CULVERT Subtotal: $38,500.00 TX-467-5.1 No. Description Unit Qty Unit Price Ext Price C7 5'X 3' PRECAST SAFETY END EACH 2 $20,500.00 $41,000.00 TREATMENT(TYPE SETB-CD) Subtotal: $41,000.00 TX-644-5.1 No. Description Unit Qty Unit Price Ext Price CIVCAST RFB 7239 CCIA Taxiway Echo Rehabilitation PN.26122 Report Created On:6/24/2026 7:08:35 PM C8 STOP SIGN,COMPLETE IN PLACE EACH 1 $1,420.00 $1,420.00 (36"x36") Subtotal:$1,420.00 P-152-5.1 No. Description Unit Qty Unit Price Ext Price C9 UNCLASSIFIED EXCAVATION CY 200 $33.00 $6,600.00 Subtotal:$6,600.00 P-152-5.2 No. Description Unit Qty Unit Price Ext Price C10 BORROW EXCAVATION CY 350 $44.00 $15,400.00 Subtotal: $15,400.00 P-620-5.1 No. Description Unit Qty Unit Price Ext Price C11 REFLECTIVE AIRFIELD PAVEMENT SF 60 $1.25 $75.00 MARKING Subtotal: $75.00 T-901-5.1 No. Description Unit Qty Unit Price Ext Price C12 SEEDING ACRE 1 $3,000.00 $3,000.00 Subtotal:$3,000.00 L-108-5.1 No. Description Unit Qty Unit Price Ext Price C13 NO. 8 AWG, 5KV, L-824,TYPE C CABLE, LF 100 $11.00 $1,100.00 INSTALLED IN TRENCH, DUCT BANK OR CONDUIT Subtotal:$1,100.00 L-108-5.2 No. Description Unit Qty Unit Price Ext Price RFB 7239 CCIA Taxiway Echo Rehabilitation PN.26122 Report Created On:6/24/2026 7:08:35 PM C14 NO. 6 AWG, SOLID, BARE COPPER EA 100 $11.00 $1,100.00 COUNTERPOISE WIRE, INSTALLED ABOVE THE DUCT BANK OR CONDUIT, INCLUDING CO N N ECTI O N S/TE RM I NATIONS Subtotal:$1,100.00 L-110-5.1 No. Description Unit Qty Unit Price Ext Price C15 CONCRETE ENCASED ELECTRICAL EA 100 $96.00 $9,600.00 CONDUIT, 1-WAY,2-INCH, INSTALLED Subtotal:$9,600.00 L-125-5.1 No. Description Unit Qty Unit Price Ext Price C16 L-852T IN-PAVEMENT TAXIWAY EDGE EA 1 $9,920.00 $9,920.00 LIGHT, INSTALLED ON NEW BASE Subtotal:$9,920.00 CIVCAS, RFB 7239 CCIA Taxiway Echo Rehabilitation PN.26122 Report Created On:6/24/2026 7:08:35 PM ACKNOWLEDGE ADDENDA NAME ACKNOWLEDGEMENT DATE Addendum No. 1 06/18/2026 22:12:49 PM Addendum No.2 06/18/2026 22:12:50 PM RFB 7239 CCIA Taxiway Echo Rehabilitation PN.26122 Report Created On:6/24/2026 7:08:35 PM REQUIRED DOWNLOADS TYPE NAME DOWNLOAD DATE Plans Plans/Drawings 5/18/2026 7:54:11 AM Other No Contact Period Statement: RFB 7239 5/18/2026 7:54:11 AM Invitation To Bid ITB: RFB 7239 5/18/2026 7:54:11 AM Addenda Addendum No. 1 5/18/2026 3:29:04 PM Addenda Addendum No.2 6/16/2026 4:12:12 PM Other Pre-Bid Presentation 6/3/2026 9:41:23 AM Other Stie Visit- Meeting Point 6/3/2026 11:13:13 AM Other Site Visit Sign-In 6/4/2026 3:32:33 PM BID FORM Project CCIA-Taxiway Echo Rehabilitation-Addendum#1 Name: Project 26122 Number: Owner: City of Corpus Christi OAR: JJoseph Johnson-Assistant Director of Construction Designer:JGarver By its signature below,Bidder accepts all of the terms and conditions of the Bid Acknowledgement,acknowledges receipt of all Addenda to the Bid and agrees,if this Bid is accepted,to enter into a Contract with the Owner and complete the Work in accordance with the Contract Documents for the Bid price. Bidder: ANDERSON COLUMBIA CO., INC. (full legal name of Bidder) e Signature: r (signature of person with authority to bind the Bidder) Name: DREW CULLEN (printed name of person signing Bid Form) Title: AGENT (title of person signing Bid Form) Attest: [; (signature) State of Residency: TEXAS Federal Tx ID No. 59-5871935 Address for Notices: P.O. BOX 10627 CORPUS CHRISTI, TEXAS 78460 Phone: 361-853-2535 Email: TXEST@ANDERSONCOLUMBIA.COM Note to Bidders: All bid items must include a bid amount to be considered a responsive bid otherwise the bids are considered "Unbalance Bid" "Unbalanced Bid"means a Bid that includes a bid that is based on unit prices that are significantly less than cost for some Bid items and significantly more than cost for others. This may be evidenced by the submission of unit price Bid items where the costs are significantly higher/lower than the cost of the same Bid items submitted by other Bidders on the project. Bid Form Project: CCIA Taxiway Echo Rehabilitation Page 1 of 4 Project No: 26122 Addendum No.2 Rev 8/2019 CONTRACT DOCUMENTS FOR CONSTRUCTION OF TAXIWAY ECHO REHABILITATION CITY PROJECT NO. 26122 AIP No. 3-48-0051-073-2026 3755 S. Capital of Texas Highway, Suite 325, Austin, TX, 78704, 512-485-00009 July 13, 2026 Record Drawing Number: AP-163 PAGE INTENTIONALLY LEFT BLANK 000100 TABLE OF CONTENTS Division/ Title Section Division 00 Preface Documents 00 00 00 Cover Sheet 00 01 00 Table of Contents(Rev 2-2026) 00 01 01 Seals Page (Optional) 00 01 02 List of Drawings Division 00 Procurement and Contracting Requirements 00 52 23 Agreement (Rev 12-2021) 00 72 00 General Conditions(Rev6-2021) 00 73 00 Supplementary Conditions(Rev4-2022) 00 74 00 Special Conditions for Federal Aviation Administration (Rev 10-2018) 00 74 01 FAA General Provisions 00 74 02 FAA Special Provisions Division 01 General Requirements 01 11 00 Summary of Work(Rev 10-2018) 01 23 10 Alternates and Allowances(Rev 5-2020) 01 29 01 Measurement and Basis for Payment (Rev 2-2026) 01 33 01 Submittal Register(Rev 10-2018) 01 35 00 Special Procedures(Rev 10-2018) 01 50 00 Temporary Facilities and Controls(Revs-2019) 01 57 00 Temporary Controls(Revs-2019) Supplemental Specification SS-101 Safety Plan Compliance Document (SPCD) SS-120 Construction Safety and Security SS-220 Ditch Grading SS-221 Geotextile Interlayer for Bituminous Pavement Overlays SS-300 Basic Electrical Requirements SS-301 Electrical Demolition and Relocation Work SS-310 Airport Lighting Systems Table of Contents 00 0100- 1 CCIA Taxiway Echo Rehabilitation Rev 2/2026 Project No: 26122 Division/ Title Section FAA Standard Specifications C-100 Contractor Quality Control Program (CQCP) C-110 Method of Estimating Percentage of Material Within Specification Limits (PWL) P-101 Preparation/Removal of Existing Pavements P-152 Excavation, Subgrade, and Embankment P-401 Asphalt Mix Pavement P-603 Emulsified Asphalt Tack Coat P-620 Runway and Taxiway Marking T-901 Seeding T-904 Sodding T-905 Topsoil L-108 Underground Power Cable for Airports L-110 Airport Underground Electrical Duct Banks and Conduits L-125 Installation of Airport Lighting Systems TxDOT Specifications Tx-247 Flexible Base Tx-341 Dense-Graded Hot-Mix Asphalt Tx-462 Concrete Box Culverts and Drains Tx-467 Safety End Treatment Tx-644 Small Roadside Sign Assemblies Appendix All Testing Reports as Applicable 1 Geotechnical Report END OF SECTION Table of Contents 00 0100-2 CCIA Taxiway Echo Rehabilitation Rev 2/2026 Project No: 26122 0001 01 SEALS PAGE E.0 F T�XqS 11�1 i 1 ............................................... Philip J. Huntley Philip J. Huntley, P.E. �.............................................••/ Project Manager ,llll.o•. 122578 Garver 1 ,r Digitally Signed 07/13/2026 -------------------------------------------------------------------------------------------------------------------------- E•oF T EXgs1111 i 1 ..................... ..................... Matthew C. LeMay, P.E. Z MATTHEW C. LEMAY .. Electrical Engineer .......................................... o• Garver �1 a 112269 SSIONAL ENG\ Digitally Signed 07/13/2026 -------------------------------------------------------------------------------------------------------------------------- END OF SECTION Seals Page 00 0101- 1 CCIA Taxiway Echo Rehabilitation Rev 1/2022 Project No:26122 PAGE INTENTIONALLY LEFT BLANK Seals Page 00 0101-2 CCIA Taxiway Echo Rehabilitation Rev 1/2022 Project No:26122 00 01 02 LIST OF DRAWINGS CCIA Taxiway Echo Rehabilitation CITY PROJECT NO. 26122 GARVER PROJECT NO. 2502477 Page Sheet Number Number Sheet Title GENERAL 1 G1001 COVER SHEET 2 G1002 SHEET INDEX&SUMMARY OF QUANTITIES 3 G1101 PROJECT LAYOUT PLAN 4 G1102 SURVEY CONTROL PLAN 5 GCO01 GENERAL NOTES 6 GCO02 CONSTRUCTION SAFETY AND PHASING NOTES 1 7 GCO03 CONSTRUCTION SAFETY AND PHASING NOTES 2 8 GC100 CONSTRUCTION SAFETY& PHASING PLAN—OVERVIEW 9 GC101 CONSTRUCTION SAFETY PHASE 1 10 GC102 CONSTRUCTION SAFETY PHASE 2 11 GC103 CONSTRUCTION SAFETY PHASE 3 12 CG104 CONSTRUCTION SAFETY PHASE 4 13 GC501 CSPP DETAILS 14 GR101 BORING LOCATION PLAN CIVIL 15 CV100 EXISTING CONDITIONS—OVERVIEW 16 CV101 EXISTING CONDITIONS& DEMO PLAN 1 17 CV102 EXISTING CONDITIONS& DEMO PLAN 2 18 CE001 EROSION CONTROL NOTES 19 CE100 EROSION CONTROL—OVERVIEW 20 CE101 EROSION CONTROL PLAN 1 21 CE102 EROSION CONTROL PLAN 2 22 CE501 EROSION CONTROL DETAILS 23 CP100 PLAN AND PROFILE OVERVIEW 24 CP101 PLAN AND PROFILE 1 25 CP102 PLAN AND PROFILE 2 26 CP103 PLAN AND PROFILE 3 27 CP104 PLAN AND PROFILE 4 28 CG101 GRADING PLAN 29 CG102 RESTORATION PLAN 30 CP501 TYPICAL SECTIONS 31 CP502 PAVING DETAILS 32 CL100 ELEVATION PLAN—OVERVIEW 33 CL101 ELEVATION PLAN 1 34 CL102 ELEVATION PLAN 2 35 CM100 PAVEMENT MARKING PLANS—OVERVIEW List of Drawings 00 0102-1 CCIA Taxiway Echo Rehabilitation Project No. 26122 00 01 02 LIST OF DRAWINGS 36 CM101 PAVEMENT MARKING REMOVAL PLAN 1 37 CM102 PAVEMENT MARKING REMOVAL PLAN 2 38 CM103 PAVEMENT MARKING PLAN 1 39 CM104 PAVEMENT MARKING PLAN 2 ELECTRICAL 40 EN001 ELECTRICAL NOTES AND LEGEND 41 ED101 ELECTRICAL DEMOLITION PLAN 42 ES101 ELECTRICAL INSTALLATION PLAN 43 EL501 ELECTRICAL DETAILS 1 44 EL502 ELECTRICAL DETAILS 2 CROSS SECTIONS 45 XC301 CROSS SECTIONS 1—ARFF ACCESS ROAD 46 XC302 CROSS SECTIONS 2—ARFF ACCESS ROAD END OF SECTION List of Drawings 00 0102-2 CCIA Taxiway Echo Rehabilitation Project No. 26122 .bus cgs_ v �NOORPOPPSE� 1852 00 52 23 AGREEMENT This Agreement, for the Project awarded on [insert Award Date], is between the City of Corpus Christi (Owner) and (Contractor). Owner and Contractor agree as follows: ARTICLE 1—WORK 1.01 Contractor shall complete all Work as specified or indicated in the Contract Documents. The Work is generally described as: CCIA Taxiway Echo Rehabilitation Project No: 26122 ARTICLE 2—DESIGNER AND OWNER'S AUTHORIZED REPRESENTATIVE 2.01 The Project has been designed by: Garver 3755 S. Capital of Texas Highway,Suite#325 Austin,Texas 78704 PJHuntley@GarverUSA.com 2.02 The Owner's Authorized Representative for this Project is: Joseph Johnson—Assistant Director of Engineering Construction Management 1201 Leopard Drive Corpus Christi,Texas, 78401 JosephJ2@CorpusChristiTX.gov ARTICLE 3—CONTRACT TIMES 3.01 Contract Times A. The Work is required to be substantially completed within 90 days after the date when the Contract Times commence to run as provided in the Notice to Proceed and is to be completed and ready for final payment in accordance with Paragraph 17.16 of the General Conditions within 120 days after the date when the Contract Times commence to run. B. Performance of the Work is required as shown in Paragraph 7.02 of the General Conditions. Agreement 00 52 23- 1 CCIA Taxiway Echo Rehabilitation Rev 12/2021 Project No:26122 C. Milestones,and the dates for completion of each,are as defined in Section 0135 00 SPECIAL PROCEDURES. 3.02 Liquidated Damages A. Owner and Contractor recognize that time limits for specified Milestones, Substantial Completion, and completion and readiness for Final Payment as stated in the Contract Documents are of the essence of the Contract. Owner and Contractor recognize that the Owner will suffer financial loss if the Work is not completed within the times specified in Paragraph 3.01 and as adjusted in accordance with Paragraph 11.05 of the General Conditions. Owner and Contractor also recognize the delays, expense, and difficulties involved in proving in a legal or arbitration proceeding the actual loss suffered by Owner if the Work is not completed on time. Accordingly, instead of requiring any such proof,Owner and Contractor agree that as liquidated damages for delay (but not as a penalty): 1. Substantial Completion: Contractor shall pay Owner$1,900.00 for each day that expires after the time specified in Paragraph 3.01 for Substantial Completion until the Work is substantially complete. 2. Completion of the Remaining Work: Contractor agrees to pay Owner$1,900.00 for each day that expires after the time specified in Paragraph 3.01 for completion and readiness for final payment until the Work is completed and ready for final payment in accordance with Paragraph 17.16 of the General Conditions. 3. Liquidated damages for failing to timely attain Substantial Completion and Final Completion are not additive and will not be imposed concurrently. 4. Milestones: Contractor agrees to pay Owner liquidated damages as stipulated in SECTION 0135 00 SPECIAL PROCEDURES for failure to meet Milestone completions. 5. The Owner will determine whether the Work has been completed within the Contract Times. B. Owner is not required to only assess liquidated damages, and Owner may elect to pursue its actual damages resulting from the failure of Contractor to complete the Work in accordance with the requirements of the Contract Documents. ARTICLE 4—CONTRACT PRICE 4.01 Owner will pay Contractor for completion of the Work in accordance with the Contract Documents at the unit prices shown in the attached BID FORM. Unit prices have been computed in accordance with Paragraph 15.03 of the General Conditions. Contractor acknowledges that estimated quantities are not guaranteed, and were solely for the purpose of comparing Bids, and final payment for all unit price items will be based on actual quantities, determined as provided in the Contract Documents. Total Base Bid Price $ Total Base Bid + Additive Alternate 1 Price $ Agreement 00 52 23-2 CCIA Taxiway Echo Rehabilitation Rev 12/2021 Project No: 26122 ARTICLE 5—PAYMENT PROCEDURES 5.01 Submit Applications for Payment in accordance with Article 17 of the General Conditions. Applications for Payment will be processed by the OAR as provided in the General Conditions. 5.02 Progress Payments; Retainage: A. The Owner will make progress payments on or about the 25th day of each month during performance of the Work. Payment is based on Work completed in accordance with the Schedule of Values established as provided in the General Conditions. B. Progress payments equal to the full amount of the total earned value to date for completed Work minus the retainage listed below and properly stored materials will be made prior to Substantial Completion. 1. The standard retainage is 10 percent. C. Payment will be made for the amount determined per Paragraph 5.02.13, less the total of payments previously made and less set-offs determined in accordance with Paragraph 17.01 of the General Conditions. D. At the Owner's option, Owner may pay Contractor 100 percent of the Work completed, less amounts withheld in accordance with Paragraph 17.01 of the General Conditions and less 200 percent of OAR's estimate of the value of Work to be completed or corrected to reach Substantial Completion. Owner may, at its sole discretion, elect to hold retainage in the amounts set forth above for progress payments prior to Substantial Completion if Owner has concerns with the ability of the Contractor to complete the remaining Work in accordance with the Contract Documents or within the time frame established by this Agreement. Release or reduction in retainage is contingent upon and consent of surety to the reduction in retainage. 5.03 Owner will pay the remainder of the Contract Price as recommended by OAR in accordance with Paragraph 17.16 of the General Conditions upon Final Completion and acceptance of the Work. ARTICLE 6—INTEREST ON OVERDUE PAYMENTS AND RETAINAGE 6.01 The Owner is not obligated to pay interest on overdue payments except as required by Texas Government Code Chapter 2251. Invoices must comply with Article 17 of the General Conditions. 6.02 Except as specified in Article 5, the Owner is not obligated to pay interest on moneys not paid except as provided in Texas Government Code Chapter 2252. ARTICLE 7—CONTRACTOR'S REPRESENTATIONS 7.01 The Contractor makes the following representations: A. The Contractor has examined and carefully studied the Contract Documents and the other related data identified in the Bidding Documents. B. The Contractor has visited the Site and become familiar with and is satisfied as to the general, local, and Site conditions that may affect cost, progress, and performance of the Work. Agreement 00 52 23-3 CCIA Taxiway Echo Rehabilitation Rev 12/2021 Project No: 26122 C. The Contractor is familiar with Laws and Regulations that may affect cost, progress, and performance of the Work. D. The Contractor has carefully studied the following Site-related reports and drawings as identified in the Supplementary Conditions: 1. Geotechnical Data Reports regarding subsurface conditions at or adjacent to the Site; 2. Drawings of physical conditions relating to existing surface or subsurface structures at the Site; 3. Underground Facilities referenced in reports and drawings; 4. Reports and drawings relating to Hazardous Environmental Conditions, if any, at or adjacent to the Site; and 5. Technical Data related to each of these reports and drawings. E. The Contractor has considered the: 1. Information known to Contractor; 2. Information commonly known to contractors doing business in the locality of the Site; 3. Information and observations obtained from visits to the Site; and 4. The Contract Documents. F. The Contractor has considered the items identified in Paragraphs 7.01.D and 7.01.E with respect to the effect of such information, observations, and documents on: 1. The cost, progress, and performance of the Work; 2. The means, methods, techniques, sequences, and procedures of construction to be employed by Contractor; and 3. Contractor's safety precautions and programs. G. Based on the information and observations referred to in the preceding paragraphs, Contractor agrees that no further examinations, investigations, explorations, tests, studies, or data are necessary for the performance of the Work at the Contract Price, within the Contract Times, and in accordance with the other terms and conditions of the Contract Documents. H. The Contractor is aware of the general nature of Work to be performed by Owner and others at the Site that relates to the Work as indicated in the Contract Documents. I. The Contractor has correlated the information known to the Contractor, information and observations obtained from visits to the Site, reports and drawings identified in the Contract Documents, and all additional examinations, investigations, explorations, tests, studies, and data with the Contract Documents. J. The Contractor has given the OAR written notice of all conflicts, errors, ambiguities, or discrepancies that the Contractor has discovered in the Contract Documents,and the written resolution provided by the OAR is acceptable to the Contractor. K. The Contract Documents are generally sufficient to indicate and convey understanding of all terms and conditions for performance and furnishing of the Work. Agreement 00 52 23-4 CCIA Taxiway Echo Rehabilitation Rev 12/2021 Project No: 26122 L. Contractor's entry into this Contract constitutes an incontrovertible representation by Contractor that without exception all prices in the Agreement are premised upon performing and furnishing the Work required by the Contract Documents. M. CONTRACTOR SHALL INDEMNIFY, DEFEND AND HOLD HARMLESS THE OWNER'S INDEMNITEES IN ACCORDANCE WITH PARAGRAPH 7.14 OF THE GENERAL CONDITIONS AND THE SUPPLEMENTARY CONDITIONS. ARTICLE 8—ACCOUNTING RECORDS 8.01 Accounting Record Availability: The Contractor shall keep such full and detailed accounts of materials incorporated and labor and equipment utilized for the Work consistent with the requirements of Paragraph 15.01 of the General Conditions and as may be necessary for proper financial management under this Agreement. Subject to prior written notice,the Owner shall be afforded reasonable access during normal business hours to all of the Contractor's records, books, correspondence, instructions, drawings, receipts,vouchers,memoranda,and similar data relating to the Cost of the Work and the Contractor's fee. The Contractor shall preserve all such documents for a period of 3 years after the final payment by the Owner. ARTICLE 9—CONTRACT DOCUMENTS 9.01 Contents: A. The Contract Documents consist of the following: 1. Solicitation documents. 2. Specifications, forms, and documents listed in SECTION 00 0100 TABLE OF CONTENTS. 3. Drawings listed in the Sheet Index. 4. Addenda. 5. Exhibits to this Agreement: a. Contractor's Bid Form. 6. Documentation required by the Contract Documents and submitted by Contractor prior to Notice of Award. B. There are no Contract Documents other than those listed above in this Article. C. The Contract Documents may only be amended, modified, or supplemented as provided in Article 11 of the General Conditions. ARTICLE 10—CONTRACT DOCUMENT SIGNATURES (SIGNATURE PAGE FOLLOWS) Agreement 00 52 23-5 CCIA Taxiway Echo Rehabilitation Rev 12/2021 Project No: 26122 ATTEST CITY OF CORPUS CHRISTI Rebecca Huerta Jeffrey Edmonds, P.E City Secretary Director of Engineering Services AUTHORIZED APPROVED AS TO LEGAL FORM: BY COUNCIL Assistant City Attorney ATTEST(IF CORPORATION) CONTRACTOR (Seal Below) By: Note: Attach copy of authorization to sign if Title: person signing for CONTRACTOR is not President Vice President Chief Executive Officer, or Chief Financial Officer Address City State Zip Phone Fax EMail END OF SECTION Agreement 00 52 23-6 CCIA Taxiway Echo Rehabilitation Rev 12/2021 Project No: 26122 00 72 00 GENERAL CONDITIONS Table of Contents Page Article 1—Definitions and Terminology .....................................................................................................10 1.01 Defined Terms.............................................................................................................................10 1.02 Terminology................................................................................................................................15 Article2—Preliminary Matters...................................................................................................................16 2.01 Delivery of Bonds and Evidence of Insurance.............................................................................16 2.02 Copies of Documents..................................................................................................................16 2.03 Project Management System......................................................................................................16 2.04 Before Starting Construction ......................................................................................................17 2.05 Preconstruction Conference; Designation of Authorized Representatives................................17 Article 3—Contract Documents: Intent, Requirements, Reuse.................................................................17 3.01 Intent...........................................................................................................................................17 3.02 Reference Standards...................................................................................................................18 3.03 Reporting and Resolving Discrepancies......................................................................................19 3.04 Interpretation of the Contract Documents.................................................................................20 3.05 Reuse of Documents...................................................................................................................20 Article 4—Commencement and Progress of the Work..............................................................................20 4.01 Commencement of Contract Times; Notice to Proceed.............................................................20 4.02 Starting the Work........................................................................................................................20 4.03 Progress Schedule.......................................................................................................................21 4.04 Delays in Contractor's Progress..................................................................................................21 Article 5—Availability of Lands; Subsurface and Physical Conditions; Hazardous Environmental Conditions...................................................................................................................................................22 5.01 Availability of Lands....................................................................................................................22 5.02 Use of Site and Other Areas........................................................................................................22 5.03 Subsurface and Physical Conditions............................................................................................23 5.04 Differing Subsurface or Physical Conditions...............................................................................24 5.05 Underground Facilities................................................................................................................25 5.06 Hazardous Environmental Conditions at Site .............................................................................26 Article 6—Bonds and Insurance .................................................................................................................28 6.01 Performance, Payment, and Other Bonds..................................................................................28 General Conditions 00 72 00-1 Corpus Christi Standards Rev 6/2021 6.02 Licensed Sureties ........................................................................................................................29 6.03 Required Minimum Insurance Coverage....................................................................................29 6.04 General Insurance Provisions......................................................................................................29 6.05 Contractor's Insurance................................................................................................................30 6.06 Property Insurance......................................................................................................................33 6.07 Waiver of Rights..........................................................................................................................34 6.08 Owner's Insurance for Project....................................................................................................34 6.09 Acceptable Evidence of Insurance..............................................................................................35 6.10 Certificate of Insurance...............................................................................................................35 6.11 Insurance Policies........................................................................................................................35 6.12 Continuing Evidence of Coverage...............................................................................................35 6.13 Notices Regarding Insurance ......................................................................................................35 6.14 Texas Workers' Compensation Insurance Required Notice .......................................................36 Article 7-Contractor's Responsibilities.....................................................................................................38 7.01 Supervision and Superintendence..............................................................................................38 7.02 Labor; Working Hours.................................................................................................................38 7.03 Services, Materials, and Equipment ...........................................................................................39 7.04 Concerning Subcontractors, Suppliers, and Others....................................................................39 7.05 Patent Fees and Royalties...........................................................................................................40 7.06 Permits........................................................................................................................................41 7.07 Taxes...........................................................................................................................................41 7.08 Laws and Regulations..................................................................................................................41 7.09 Safety and Protection .................................................................................................................42 7.10 Safety Representative.................................................................................................................43 7.11 Hazard Communication Programs..............................................................................................43 7.12 Emergencies................................................................................................................................43 7.13 Contractor's General Warranty and Guarantee .........................................................................43 7.14 INDEMNIFICATION......................................................................................................................44 7.15 Delegation of Professional Design Services................................................................................45 Article 8-Other Work at the Site...............................................................................................................46 8.01 Other Work.................................................................................................................................46 8.02 Coordination ...............................................................................................................................47 8.03 Legal Relationships......................................................................................................................47 General Conditions 00 72 00-2 Corpus Christi Standards Rev 6/2021 Article 9—Owner's and OPT's Responsibilities...........................................................................................48 9.01 Communications to Contractor ..................................................................................................48 9.02 Replacement of Owner's Project Team Members......................................................................48 9.03 Furnish Data................................................................................................................................48 9.04 Pay When Due.............................................................................................................................48 9.05 Lands and Easements; Reports and Tests...................................................................................48 9.06 Insurance.....................................................................................................................................48 9.07 Modifications..............................................................................................................................48 9.08 Inspections,Tests, and Approvals...............................................................................................48 9.09 Limitations on OPT's Responsibilities .........................................................................................48 9.10 Undisclosed Hazardous Environmental Condition......................................................................49 9.11 Compliance with Safety Program................................................................................................49 Article 10—OAR's and Designer's Status During Construction ..................................................................49 10.01 Owner's Representative..........................................................................................................49 10.02 Visits to Site.............................................................................................................................49 10.03 Resident Project Representatives...........................................................................................49 10.04 Rejecting Defective Work........................................................................................................49 10.05 Shop Drawings, Modifications and Payments.........................................................................50 10.06 Decisions on Requirements of Contract Documents and Acceptability of Work...................50 10.07 Limitations on OAR's and Designer's Authority and Responsibilities.....................................50 Article 11—Amending the Contract Documents; Changes in the Work ....................................................50 11.01 Amending and Supplementing the Contract Documents.......................................................50 11.02 Owner-Authorized Changes in the Work................................................................................51 11.03 Unauthorized Changes in the Work........................................................................................51 11.04 Change of Contract Price ........................................................................................................52 11.05 Change of Contract Times.......................................................................................................52 11.06 Change Proposals....................................................................................................................52 11.07 Execution of Change Orders ...................................................................................................53 11.08 Notice to Surety......................................................................................................................54 Article 12—Change Management ..............................................................................................................54 12.01 Requests for Change Proposal................................................................................................54 12.02 Change Proposals....................................................................................................................54 12.03 Designer Will Evaluate Request for Modification...................................................................55 General Conditions 00 72 00-3 Corpus Christi Standards Rev 6/2021 12.04 Substitutions...........................................................................................................................55 Article13—Claims.......................................................................................................................................56 13.01 Claims......................................................................................................................................56 13.02 Claims Process.........................................................................................................................57 Article 14—Prevailing Wage Rate Requirements.......................................................................................58 14.01 Payment of Prevailing Wage Rates.........................................................................................58 14.02 Records....................................................................................................................................58 14.03 Liability; Penalty; Criminal Offense.........................................................................................59 14.04 Prevailing Wage Rates.............................................................................................................59 Article 15—Cost of the Work; Allowances; Unit Price Work......................................................................59 15.01 Cost of the Work.....................................................................................................................59 15.02 Allowances..............................................................................................................................63 15.03 Unit Price Work.......................................................................................................................63 15.04 Contingencies..........................................................................................................................64 Article 16—Tests and Inspections; Correction, Removal, or Acceptance of Defective Work....................65 16.01 Access to Work........................................................................................................................65 16.02 Tests, Inspections and Approvals............................................................................................65 16.03 Defective Work .......................................................................................................................65 16.04 Acceptance of Defective Work................................................................................................66 16.05 Uncovering Work....................................................................................................................66 16.06 Owner May Stop the Work.....................................................................................................67 16.07 Owner May Correct Defective Work.......................................................................................67 Article 17—Payments to Contractor; Set-Offs; Completion; Correction Period ........................................67 17.01 Progress Payments..................................................................................................................67 17.02 Application for Payment.........................................................................................................69 17.03 Schedule of Values..................................................................................................................71 17.04 Schedule of Anticipated Payments and Earned Value............................................................72 17.05 Basis for Payments..................................................................................................................73 17.06 Payment for Stored Materials and Equipment.......................................................................73 17.07 Retainage and Set-Offs ...........................................................................................................74 17.08 Procedures for Submitting an Application for Payment.........................................................74 17.09 Responsibility of Owner's Authorized Representative...........................................................75 17.10 Contractor's Warranty of Title................................................................................................76 General Conditions 00 72 00-4 Corpus Christi Standards Rev 6/2021 17.11 Substantial Completion...........................................................................................................76 17.12 Partial Utilization.....................................................................................................................77 17.13 Final Inspection.......................................................................................................................77 17.14 Final Application for Payment.................................................................................................77 17.15 Final Payment..........................................................................................................................78 17.16 Waiver of Claims.....................................................................................................................78 17.17 Correction Period....................................................................................................................78 Article 18-Suspension of Work and Termination.....................................................................................79 18.01 Owner May Suspend Work.....................................................................................................79 18.02 Owner May Terminate for Cause............................................................................................79 18.03 Owner May Terminate For Convenience................................................................................80 Article 19-Project Management...............................................................................................................81 19.01 Work Included.........................................................................................................................81 19.02 Quality Assurance ...................................................................................................................81 19.03 Document Submittal...............................................................................................................81 19.04 Required Permits ....................................................................................................................81 19.05 Safety Requirements...............................................................................................................82 19.06 Access to the Site....................................................................................................................82 19.07 Contractor's Use of Site..........................................................................................................82 19.08 Protection of Existing Structures and Utilities........................................................................83 19.09 Pre-Construction Exploratory Excavations..............................................................................83 19.10 Disruption of Services/Continued Operations........................................................................84 19.11 Field Measurements ...............................................................................................................84 19.12 Reference Data and Control Points.........................................................................................84 19.13 Delivery and Storage...............................................................................................................85 19.14 Cleaning During Construction.................................................................................................86 19.15 Maintenance of Roads, Driveways, and Access......................................................................86 19.16 Area Access and Traffic Control..............................................................................................87 19.17 Overhead Electrical Wires.......................................................................................................87 19.18 Blasting....................................................................................................................................87 19.19 Archeological Requirements...................................................................................................87 19.20 Endangered Species Resources...............................................................................................88 19.21 Cooperation with Public Agencies..........................................................................................88 General Conditions 00 72 00-5 Corpus Christi Standards Rev 6/2021 Article 20—Project Coordination................................................................................................................88 20.01 Work Included.........................................................................................................................88 20.02 Document Submittal...............................................................................................................88 20.03 Communication During Project...............................................................................................89 20.04 Project Meetings.....................................................................................................................89 20.05 Requests for Information........................................................................................................91 20.06 Decision and Action Item Log..................................................................................................91 20.07 Notification By Contractor......................................................................................................92 20.08 Record Documents..................................................................................................................92 Article 21—Quality Management...............................................................................................................94 21.01 Contractor's Responsibilities ..................................................................................................94 21.02 Quality Management Activities by OPT..................................................................................95 21.03 Contractor's Use of OPT's Test Reports..................................................................................96 21.04 Documentation .......................................................................................................................96 21.05 Standards................................................................................................................................97 21.06 Delivery and Storage...............................................................................................................97 21.07 Verification Testing for Corrected Defects..............................................................................97 21.08 Test Reports............................................................................................................................97 21.09 Defective Work .......................................................................................................................98 21.10 Limitation of Authority of Testing Laboratory........................................................................98 21.11 Quality Control Plan................................................................................................................98 21.12 Implement Contractor's Quality Control Plan ......................................................................100 Article 22—Final Resolution of Disputes..................................................................................................101 22.01 Senior Level Negotiations .....................................................................................................101 22.02 Mediation..............................................................................................................................101 Article 23—Minority/MBE/DBE Participation Policy................................................................................102 23.01 Policy.....................................................................................................................................102 23.02 Definitions.............................................................................................................................102 23.03 Goals......................................................................................................................................103 23.04 Compliance............................................................................................................................104 Article 24—Document Management........................................................................................................104 24.01 Work Included.......................................................................................................................104 24.02 Quality Assurance .................................................................................................................104 General Conditions 00 72 00-6 Corpus Christi Standards Rev 6/2021 24.03 Contractor's Responsibilities ................................................................................................104 24.04 Document Submittal.............................................................................................................105 24.05 Document Numbering ..........................................................................................................105 24.06 Document Requirements......................................................................................................106 Article25—Shop Drawings.......................................................................................................................107 25.01 Work Included.......................................................................................................................107 25.02 Quality Assurance .................................................................................................................107 25.03 Contractor's Responsibilities ................................................................................................107 25.04 Shop Drawing Requirements ................................................................................................109 25.05 Special Certifications and Reports........................................................................................109 25.06 Warranties and Guarantees..................................................................................................110 25.07 Shop Drawing Submittal Procedures....................................................................................110 25.08 Sample and Mockup Submittal Procedures..........................................................................112 25.09 Equal Non Specified Products...............................................................................................113 25.10 Requests for Deviation..........................................................................................................113 25.11 Designer Responsibilities......................................................................................................114 25.12 Resubmission Requirements.................................................................................................116 Article26—Record Data...........................................................................................................................117 26.01 Work Included.......................................................................................................................117 26.02 Quality Assurance .................................................................................................................117 26.03 Contractor's Responsibilities ................................................................................................117 26.04 Record Data Requirements...................................................................................................118 26.05 Special Certifications and Reports........................................................................................118 26.06 Warranties and Guarantees..................................................................................................119 26.07 Record Data Submittal Procedures.......................................................................................119 26.08 Designer's Responsibilities....................................................................................................120 Article 27—Construction Progress Schedule............................................................................................121 27.01 Requirements........................................................................................................................121 27.02 Document Submittal.............................................................................................................121 27.03 Schedule Requirements........................................................................................................121 27.04 Schedule Revisions................................................................................................................123 27.05 Float Time..............................................................................................................................123 Article 28—Video and Photographic documentation ..............................................................................124 General Conditions 00 72 00-7 Corpus Christi Standards Rev 6/2021 28.01 Work Included.......................................................................................................................124 28.02 Quality Assurance .................................................................................................................124 28.03 Document Submittal.............................................................................................................124 28.04 Photographs..........................................................................................................................125 28.05 Video Recording....................................................................................................................125 Article 29-Execution and Closeout.........................................................................................................125 29.01 Substantial Completion.........................................................................................................125 29.02 Final Inspections....................................................................................................................126 29.03 Reinspection Fees .................................................................................................................126 29.04 Closeout Documents Submittal ............................................................................................127 29.05 Transfer of Utilities ...............................................................................................................127 29.06 Warranties, Bonds and Service Agreements.........................................................................127 Article30-Miscellaneous........................................................................................................................128 30.01 Computation of Times...........................................................................................................128 30.02 Owner's Right to Audit Contractor's Records.......................................................................128 30.03 Independent Contractor.......................................................................................................129 30.04 Cumulative Remedies ...........................................................................................................129 30.05 Limitation of Damages..........................................................................................................129 30.06 No Waiver.............................................................................................................................129 30.07 Severability............................................................................................................................129 30.08 Survival of Obligations ..........................................................................................................130 30.09 No Third Party Beneficiaries .................................................................................................130 30.10 Assignment of Contract.........................................................................................................130 30.11 No Waiver of Sovereign Immunity........................................................................................130 30.12 Controlling Law.....................................................................................................................130 30.13 Conditions Precedent to Right to Sue...................................................................................130 30.14 Waiver of Trial by Jury...........................................................................................................130 30.15 Attorney Fees........................................................................................................................130 30.16 Compliance with Laws...........................................................................................................131 30.17 Enforcement..........................................................................................................................131 30.18 Subject to Appropriation.......................................................................................................131 30.19 Contract Sum.........................................................................................................................131 30.20 Contractor's Guarantee as Additional Remedy....................................................................131 General Conditions 00 72 00-8 Corpus Christi Standards Rev 6/2021 30.21 Notices. .................................................................................................................................131 General Conditions 00 72 00-9 Corpus Christi Standards Rev 6/2021 ARTICLE 1—DEFINITIONS AND TERMINOLOGY 1.01 Defined Terms A. Terms with initial capital letters, including the term's singular and plural forms, have the meanings indicated in this paragraph wherever used in the Bidding Requirements or Contract Documents. In addition to the terms specifically defined, terms with initial capital letters in the Contract Documents may include references to identified articles and paragraphs, and the titles of other documents or forms. 1. Addenda - Documents issued prior to the receipt of Bids which clarify or modify the Bidding Requirements or the proposed Contract Documents. 2. Agreement - The document executed between Owner and Contractor covering the Work. 3. Alternative Dispute Resolution -The process by which a disputed Claim may be settled as an alternative to litigation, if Owner and Contractor cannot reach an agreement between themselves. 4. Application for Payment - The forms used by Contractor to request payments from Owner and the supporting documentation required by the Contract Documents. 5. Award Date—The date the City Council of the City of Corpus Christi (City)authorizes the City Manager or designee to execute the Contract on behalf of the City. 6. Bid —The documents submitted by a Bidder to establish the proposed Contract Price and Contract Times and provide other information and certifications as required by the Bidding Documents. 7. Bidding Documents — The solicitation documents, the proposed Contract Documents and Addenda. 8. Bidder—An individual or entity that submits a Bid to Owner. 9. Bonds - Performance Bond, Payment Bond, Maintenance Bond, and other Surety instruments executed by Surety. When in singular form, refers to individual instrument. 10. Change Order-A document issued on or after the Effective Date of the Contract,which modifies the Work, Contract Price, Contract Times, or terms and conditions of the Contract. 11. Change Proposal - A document submitted by Contractor in accordance with the requirements of the Contract Documents: a. Requesting an adjustment in Contract Price or Contract Times; b. Contesting an initial decision concerning the requirements of the Contract Documents or the acceptability of Work under the Contract Documents; c. Challenging a set-off against payment due; or d. Seeking a Modification with respect to the terms of the Contract. 12. City Engineer - The Corpus Christi City Engineer and/or designee as identified at the preconstruction conference or in the Notice to Proceed. General Conditions 00 72 00-10 Corpus Christi Standards Rev 6/2021 13. Claim - A demand or assertion by Owner or Contractor submitted in accordance with the requirements of the Contract Documents. A demand for money or services by an entity other than the Owner or Contractor is not a Claim. Claims must be initiated by written notice, signed and sworn to be an authorized corporate officer, verifying the truth and accuracy of the Claim. 14. Constituent of Concern - Asbestos, petroleum, radioactive materials, polychlorinated biphenyls (PCBs), hazardous wastes, and substances, products, wastes, or other materials that are or become listed, regulated, or addressed pursuant to: a. The Comprehensive Environmental Response, Compensation and Liability Act, 42 U.S.C. §§9601 et seq. ("CERCLA"); b. The Hazardous Materials Transportation Act, 49 U.S.C. §§5101 et seq.; c. The Resource Conservation and Recovery Act,42 U.S.C. §§6901 et seq. ("RCRA"); d. The Toxic Substances Control Act, 15 U.S.C. §§2601 et seq.; e. The Clean Water Act, 33 U.S.C. §§1251 et seq.; f. The Clean Air Act, 42 U.S.C. §§7401 et seq.; or g. Any other Laws or Regulations regulating, relating to, or imposing liability or standards of conduct concerning hazardous,toxic, or dangerous waste, substance, or material. 15. Contract -The entire integrated set of documents concerning the Work and describing the relationship between the Owner and Contractor. 16. Contract Amendment-A document issued on or after the Effective Date of the Contract and signed by Owner and Contractor which: a. Authorizes new phases of the Work and establishes the Contract Price, Contract Times, or terms and conditions of the Contract for the new phase of Work; or b. Modifies the terms and conditions of the Contract but does not make changes in the Work. 17. Contract Documents - Those items designated as Contract Documents in the Agreement. 18. Contract Price - The monetary amount stated in the Agreement and as adjusted by Modifications,and increases or decreases in unit price quantities, if any,that Owner has agreed to pay Contractor for completion of the Work in accordance with the Contract Documents. 19. Contract Times-The number of days or the dates by which Contractor must: a. Achieve specified Milestones; b. Achieve Substantial Completion; and c. Complete the Work. 20. Contractor-The individual or entity with which Owner has contracted for performance of the Work. General Conditions 00 72 00-11 Corpus Christi Standards Rev 6/2021 21. Contractor's Team - Contractor and Subcontractors, Suppliers, individuals, or entities directly or indirectly employed or retained by them to perform part of the Work or anyone for whose acts they may be liable. 22. Cost of the Work -The sum of costs incurred for the proper performance of the Work as allowed by Article 15. 23. Defective - When applied to Work, refers to Work that is unsatisfactory, faulty, or deficient in that it: a. Does not conform to the Contract Documents; b. Does not meet the requirements of applicable inspections, reference standards, tests, or approvals referred to in the Contract Documents; or c. Has been damaged or stolen prior to OAR's recommendation of final payment unless responsibility for the protection of the Work has been assumed by Owner at Substantial Completion 24. Designer - The individuals or entity named as Designer in the Agreement and the subconsultants, individuals, or entities directly or indirectly employed or retained by Designer to provide design or other technical services to the Owner. Designer has responsibility for engineering or architectural design and technical issues related to the Contract Documents. Designers are Licensed Professional Engineers, Registered Architects or Registered Landscape Architects qualified to practice their profession in the State of Texas. 25. Drawings - The part of the Contract that graphically shows the scope, extent, and character of the Work. Shop Drawings and other Contractor documents are not Drawings. 26. Effective Date of the Contract -The date indicated in the Agreement on which the City Manager or designee has signed the Contract. 27. Field Order-A document issued by OAR or Designer requiring changes in the Work that do not change the Contract Price or the Contract Times. 28. Hazardous Environmental Condition - The presence of Constituents of Concern at the Site in quantities or circumstances that may present a danger to persons or property exposed to Constituents of Concern. The presence of Constituents of Concern at the Site necessary for the execution of the Work or to be incorporated in the Work is not a Hazardous Environmental Condition provided these Constituents of Concern are controlled and contained pursuant to industry practices, Laws and Regulations, and the requirements of the Contract. 29. Indemnified Costs-All costs, losses,damages,and legal or other dispute resolution costs resulting from claims or demands against Owner. These costs include fees for engineers, architects, attorneys, and other professionals. 30. Laws and Regulations; Laws or Regulations-Applicable laws,statutes, rules, regulations, ordinances,codes,and orders of governmental bodies,agencies,authorities,and courts having jurisdiction over the Project. 31. Liens - Charges, security interests, or encumbrances upon Contract related funds, real property, or personal property. General Conditions 00 72 00-12 Corpus Christi Standards Rev 6/2021 32. Milestone-A principal event in the performance of the Work that Contractor is required by Contract to complete by a specified date or within a specified period of time. 33. Modification - Change made to the Contract Documents by one of the following methods: a. Contract Amendment; b. Change Order; c. Field Order; or d. Work Change Directive. 34. Notice of Award-The notice of Owner's intent to enter into a contract with the Selected Bidder. 35. Notice to Proceed - A notice to Contractor of the Contract Times and the date Work is to begin. 36. Owner-The City of Corpus Christi (City), a Texas home-rule municipal corporation and political subdivision organized under the laws of the State of Texas, acting by and through its duly authorized City Manager and designee, the City Engineer (the Director of Engineering Services), and the City's officers, employees, agents, or representatives, authorized to administer design and construction of the Project. 37. Owner's Authorized Representative or OAR -The individual or entity named as OAR in the Agreement and the consultants, subconsultants, individuals, or entities directly or indirectly employed or retained by them to provide construction management services to the Owner. The OAR may be an employee of the Owner. 38. Owner's Project Team or OPT - The Owner, Owner's Authorized Representative, Resident Project Representative, Designer, and the consultants, subconsultants, individuals or entities directly or indirectly employed or retained by them to provide services to the Owner. 39. Partial Occupancy or Use - Use by Owner of a substantially completed part of the Work for the purpose for which it is intended (or a related purpose) prior to Substantial Completion of all the Work. 40. Progress Schedule -A schedule prepared and maintained by Contractor, describing the sequence and duration of the activities comprising the Contractor's plan to accomplish the Work within the Contract Times. The Progress Schedule must be a Critical Path Method (CPM) Schedule. 41. Project - The total undertaking to be accomplished for Owner under the Contract Documents. 42. Project Manual — That portion of the Contract Documents that may include the following: introductory information,solicitation requirements and responses, proposal, Contract forms and General and Supplementary Conditions, General Requirements, Specification, Drawings, Project Safety Manual and Addenda. 43. Resident Project Representative or RPR-The authorized representative of OPT assigned to assist OAR at the Site. As used herein, the term Resident Project Representative includes assistants and field staff of the OAR. General Conditions 00 72 00-13 Corpus Christi Standards Rev 6/2021 44. Samples - Physical examples of materials, equipment, or workmanship representing some portion of the Work that are used to establish the standards for that portion of the Work. 45. Schedule of Documents-A schedule of required documents, prepared and maintained by Contractor. 46. Schedule of Values - A schedule, prepared and maintained by Contractor, allocating portions of the Contract Price to various portions of the Work and used as the basis for Contractor's Applications for Payment. 47. Shop Drawings - All drawings, diagrams, illustrations, schedules, and other data or information that are specifically prepared or assembled and submitted by Contractor to illustrate some portion of the Work. Shop Drawings,whether approved or not, are not Drawings and are not Contract Documents. 48. Site - Lands or areas indicated in the Contract Documents as being furnished by Owner upon which the Work is to be performed. The Site includes rights-of-way, easements, and other lands furnished by Owner which are designated for use by the Contractor. 49. Specifications -The part of the Contract that describes the requirements for materials, equipment, systems, standards, and workmanship as applied to the Work, and certain administrative requirements and procedural matters applicable to the Work. 50. Subcontractor-An individual or entity having a direct contract with Contractor or with other Subcontractors or Suppliers for the performance of a part of the Work. 51. Substantial Completion - The point where the Work or a specified part of the Work is sufficiently complete to be used for its intended purpose in accordance with the Contract Documents. 52. Supplementary Conditions -The part of the Contract that amends or supplements the General Conditions. 53. Supplier - A manufacturer, fabricator, supplier, distributor, materialman, or vendor having a direct contract with Contractor or with Subcontractors or other Suppliers to furnish materials or equipment to be incorporated in the Work. 54. Technical Data-Those items expressly identified as Technical Data in the Supplementary Conditions with respect to either: a. Subsurface conditions at the Site; b. Physical conditions relating to existing surface or subsurface structures at the Site, except Underground Facilities; or C. Hazardous Environmental Conditions at the Site. 55. Underground Facilities - All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, other similar facilities or appurtenances, and encasements containing these facilities which are used to convey electricity, gases, steam, liquid petroleum products, telephone or other communications, fiber optic transmissions, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. 56. Unit Price Work-Work to be paid for on the basis of unit prices. General Conditions 00 72 00-14 Corpus Christi Standards Rev 6/2021 57. Work - The construction of the Project or its component parts as required by the Contract Documents. 58. Work Change Directive -A directive issued to Contractor on or after the Effective Date of the Contract ordering an addition, deletion, or revision in the Work. The Work Change Directive serves as a memorandum of understanding regarding the directive until a Change Order can be issued. 1.02 Terminology A. The words and terms discussed in this Paragraph 1.02 are not defined, but when used in the Bidding Requirements or Contract Documents, have the indicated meaning. B. It is understood that the cost for performing Work is included in the Contract Price and no additional compensation is to be paid by Owner unless specifically stated otherwise in the Contract Documents. Expressions including or similar to "at no additional cost to Owner," "at Contractor's expense,"or similar words mean that the Contractor is to perform or provide specified operation of Work without an increase in the Contract Price. C. The terms"day"or"calendar day' mean a calendar day of 24 hours measured from midnight to the next midnight. D. The meaning and intent of certain terms or adjectives are described as follows: 1. The terms "as allowed," "as approved," "as ordered," "as directed," or similar terms in the Contract Documents indicate an exercise of professional judgment by the OPT. 2. Adjectives including or similar to "reasonable," "suitable," "acceptable," "proper," "satisfactory," or similar adjectives are used to describe a determination of OPT regarding the Work. 3. Any exercise of professional judgment by the OPT will be made solely to evaluate the Work for general compliance with the Contract Documents unless there is a specific statement in the Contract Documents indicating otherwise. 4. The use of these or similar terms or adjectives does not assign a duty or give OPT authority to supervise or direct the performance of the Work, or assign a duty or give authority to the OPT to undertake responsibilities contrary to the provisions of Articles 9 or 10 or other provisions of the Contract Documents. E. The use of the words "furnish," "install," "perform," and "provide" have the following meanings when used in connection with services, materials, or equipment: 1. Furnish means to supply and deliver the specified services, materials, or equipment to the Site or other specified location ready for use or installation. 2. Install means to complete construction or assembly of the specified services, materials, or equipment so they are ready for their intended use. 3. Perform or provide means to furnish and install specified services, materials, or equipment, complete and ready for their intended use. 4. Perform or provide the specified services, materials, or equipment complete and ready for intended use if the Contract Documents require specific services, materials, or General Conditions 00 72 00-15 Corpus Christi Standards Rev 6/2021 equipment, but do not expressly use the words "furnish," "install," "perform," or "provide." F. Contract Documents are written in modified brief style: 1. Requirements apply to all Work of the same kind, class, and type even though the word "all" is not stated. 2. Simple imperative sentence structure is used which places a verb as the first word in the sentence. It is understood that the words "furnish," "install," "perform," "provide," or similar words include the meaning of the phrase "The Contractor shall..." before these words. 3. Unless specifically stated that action is to be taken by the OPT or others, it is understood that the action described is a requirement of the Contractor. G. Words or phrases that have a well-known technical or construction industry or trade meaning are used in the Contract Documents in accordance with this recognized meaning unless stated otherwise in the Contract Documents. H. Written documents are required where reference is made to notices, reports, approvals, consents, documents, statements, instructions, opinions or other types of communications required by the Contract Documents. Approval and consent documents must be received by Contractor prior to the action or decision for which approval or consent is given. These may be made in printed or electronic format through the OPT's project management information system or other electronic media as required by the Contract Documents or approved by the OAR. I. Giving notice as required by the Contract Documents may be by printed or electronic media using a method that requires acknowledgment of the receipt of that notice. ARTICLE 2—PRELIMINARY MATTERS 2.01 Delivery of Bonds and Evidence of Insurance A. Provide required Bonds with the executed Agreement. B. Provide evidence of insurance required by the Contract Documents with the executed Agreement. 2.02 Copies of Documents A. OPT is to furnish one fully executed Agreement (either electronic or printed) and one copy of the executed Contract Documents in electronic portable document format (PDF). This document is the Project Record Copy of the Contract Documents. 2.03 Project Management System A. Owner shall administer its design and construction management through an internet-based project management system known as e-Builder. B. Contractor shall conduct all communication through and perform all project-related functions utilizing this project management system. This includes all correspondence, General Conditions 00 72 00-16 Corpus Christi Standards Rev 6/2021 submittals, requests for information, payment requests and processing, contract amendments, change orders, delivery orders and other administrative activities. C. Owner shall administer the software and provide training to Contractor's Team. 2.04 Before Starting Construction A. Provide the following preliminary documents in accordance with the Contract Documents within 10 days after the Effective Date of the Contract: 1. Progress Schedule, which must be a Critical Path Method (CPM) Schedule; 2. Schedule of Documents; and 3. Schedule of Values and projected cash flow information. 2.05 Preconstruction Conference; Designation of Authorized Representatives A. Attend the preconstruction conference as required by the Contract Documents. B. Designate the specific individuals authorized to act as representatives of the Contractor. These individuals must have the authority to transmit and receive information, render decisions relative to the Contract, and otherwise act on behalf of the Contractor. C. Owner is to designate the specific individuals authorized to act as representatives of the Owner and the limits of their authority with regard to acting on behalf of the Owner. ARTICLE 3—CONTRACT DOCUMENTS: INTENT, REQUIREMENTS, REUSE 3.01 Intent A. Requirements of components of the Contract Documents are as binding as if required by all Contract Documents. It is the intent of the Contract Documents to describe a functionally complete Project. The Contract Documents do not indicate or describe all of the Work required to complete the Project. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the OPT. 1. The Contract requirements described in the General Conditions and Supplementary Conditions apply to Work regardless of where it is described in the Contract Documents, unless specifically noted otherwise. 2. In offering a Bid for this Project and in entering into this Contract,Contractor represents: a. Contractor has studied the Contract Documents, the Work, the Site, local conditions, Laws and Regulations, and other conditions that may affect the Work; b. Contractor has studied the Technical Data and other information referred to in the Contract Documents and has or will make additional surveys and investigations as deemed necessary for the performance of the Work; c. Contractor has correlated these studies and observations with the requirements of the Contract Documents; and d. Contractor has taken all of this information into consideration in developing the Contract Price offered and that the Contract Price offered provides full compensation for providing the Work in accordance with the Contract Documents. General Conditions 00 72 00-17 Corpus Christi Standards Rev 6/2021 3. Organization of the Contract Documents is not intended to control or lessen the responsibility of the Contractor when dividing Work among Subcontractors or Suppliers, or to establish the extent of Work to be performed by trades, Subcontractors, or Suppliers. Specifications or details do not need to be indicated or specified in each Specification or Drawing. Items shown in the Contract Documents are applicable regardless of their location in the Contract Documents. 4. Standard paragraph titles and other identifications of subject matter in the Specifications are intended to aid in locating and recognizing various requirements of the Specifications. Titles do not define, limit, or otherwise restrict Specification text. 5. Provide the labor, documentation, services, materials, or equipment that may be inferred from the Contract Documents or from prevailing custom or trade usage as being required to produce the indicated result, whether specifically called for in the Contract Documents or not. Include these related costs in the offered Contract Price. B. Provide equipment that is functionally complete as described in the Contract Documents. The Drawings and Specifications do not indicate or describe all of the Work required to complete the installation of products purchased by the Owner or Contractor. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the Designer through the OAR. C. Comply with the most stringent requirements where compliance with two or more standards is specified and they establish different or conflicting requirements for the Work, unless the Contract Documents indicate otherwise. D. Provide materials and equipment comparable in quality to similar materials and equipment incorporated in the Project or as required to meet the minimum requirements of the application if the materials and equipment are shown in the Drawings but are not included in the Specifications. E. The Project Record Copy of the Contract Documents governs if there is a discrepancy between the Project Record Copy of the Contract Documents and subsequent electronic or digital versions of the Contract Documents, including printed copies derived from these electronic or digital versions. F. The Contract supersedes all prior written or oral negotiations, representations, and agreements. The Contract Documents comprise the entire Agreement between Owner and Contractor. The Contract Documents may be modified only by a Modification. G. Request clarification from OAR for a decision before proceeding if Contractor is not clear on the meaning of the Contract Documents. OAR is to issue clarifications and interpretations of the Contract Documents in accordance with the Contract Documents. 3.02 Reference Standards A. Standard Specifications, Codes, Laws and Regulations: 1. Reference in the Contract Documents to standard specifications, manuals, reference standards, or codes of technical societies, organizations, or associations, or to Laws or Regulations,whether specific or implied, are those in effect at the time Contractor's Bid is submitted or when Contractor negotiates the Contract Price unless specifically stated otherwise in the Contract Documents. General Conditions 00 72 00-18 Corpus Christi Standards Rev 6/2021 2. No provision of referenced standard specifications, manuals, reference standards, codes, or instructions of a Supplier changes the duties or responsibilities of OPT or Contractor from those described in the Contract Documents or assigns a duty to or gives authority to the OPT to supervise or direct the performance of the Work or undertake responsibilities inconsistent with the Contract Documents. 3. The provisions of the Contract Documents take precedence over standard specifications, manuals, reference standards, codes, or instructions of a Supplier unless specifically stated otherwise in the Contract Documents. B. Comply with applicable construction industry standards, whether referenced or not. 1. Standards referenced in the Contract Documents govern over standards not referenced but recognized as applicable in the construction industry. 2. Comply with the requirements of the Contract Documents if they produce a higher quality of Work than the applicable construction industry standards. 3. Designer determines whether a code or standard is applicable, which of several are applicable, or if the Contract Documents produce a higher quality of Work. C. Make copies of reference standards available if requested by OAR. 3.03 Reporting and Resolving Discrepancies A. Reporting Discrepancies: 1. Carefully study the Drawings and verify pertinent figures and dimensions with respect to actual field measurements before undertaking the Work. Immediately report conflicts, errors, ambiguities, or discrepancies that Contractor discovers or has actual knowledge of to the OAR. Do not proceed with affected Work until the conflict, error, ambiguity, or discrepancy is resolved by a clarification or interpretation from the OAR or by a Modification to the Contract Documents issued pursuant to Paragraph 11.01. 2. The exactness of existing grades, elevations, dimensions or locations given on any Drawings issued by Designer, or the work installed by other contractors, is not guaranteed by Owner. Contractor shall,therefore, satisfy itself as to the accuracy of all grades, elevations, dimensions and locations. Any errors due to Contractor's failure to verify at the site all such grades, elevations, dimensions or locations relating to such existing or other work shall be rectified by Contractor without any additional cost to Owner. 3. Immediately notify the OAR of conflicts, errors, ambiguities, or discrepancies in the Contract Documents or discrepancies between the Contract Documents and: a. Applicable Laws or Regulations; b. Actual field conditions; c. Standard specifications, manuals, reference standards, or codes; or d. Instructions of Suppliers. 4. Do not proceed with affected Work until the conflict, error, ambiguity, or discrepancy is resolved by a clarification or interpretation from the OAR or by a Modification to the General Conditions 00 72 00-19 Corpus Christi Standards Rev 6/2021 Contract Documents issued pursuant to Paragraph 11.01, except in an emergency as required by Paragraph 7.12. 5. Contractor is liable to the OPT for failure to report conflicts, errors, ambiguities, or discrepancies in the Contract Documents of which Contractor has actual knowledge. 6. Contractor is deemed to have included the most expensive item, system, procedure, etc. in the Contract Price if a conflict, error,ambiguity, or discrepancy in components of the Contract Documents was known, but not reported prior to submitting the Bid or when Contractor negotiates the Contract Price. 3.04 Interpretation of the Contract Documents A. Submit questions concerning the non-technical or contractual/administrative requirements of the Contract Documents to the OAR immediately after those questions arise. OAR is to provide an interpretation of the Contract Documents regarding these questions and will coordinate the response of the OPT to Contractor. B. Submit questions regarding the design of the Project described in the Contract Documents to the OAR immediately after those questions arise. OAR is to request an interpretation of the Contract Documents from the Designer. Designer is to respond to these questions by providing an interpretation of the Contract Documents. OAR will coordinate the response of the OPT to Contractor. C. OPT may initiate a Modification to the Contract Documents through the OAR if a response to the question indicates that a change in the Contract Documents is required. Contractor may appeal Designer's or OAR's interpretation by submitting a Change Proposal. 3.05 Reuse of Documents A. Contractor's Team has no rights to the Contract Documents and may not use the Contract Documents, or copies or electronic media editions of the Contract Documents, other than for the construction of this Project. This provision survives final payment or termination of the Contract. B. Contractor is allowed to retain a copy of the Contract Documents for record purposes, unless specifically prohibited by the Owner for security reasons. Surrender paper and digital copies of the Contract Documents and other related documents and remove these documents from computer equipment or storage devices as a condition of final payment if the Owner so directs. ARTICLE 4—COMMENCEMENT AND PROGRESS OF THE WORK 4.01 Commencement of Contract Times; Notice to Proceed A. The Contract Times commence to run on the date indicated in the Notice to Proceed. 4.02 Starting the Work A. Begin performing the Work on the date indicated in the Notice to Proceed. Do not begin Work prior to having the insurance required in Article 6 in force or before the date indicated in the Notice to Proceed. General Conditions 00 72 00-20 Corpus Christi Standards Rev 6/2021 4.03 Progress Schedule A. Construct the Work in accordance with the Progress Schedule established in accordance with the Contract Documents. 1. Adjust the Progress Schedule as required to accurately reflect actual progress on the Work. 2. Submit proposed adjustments in the Progress Schedule that change the Contract Times in accordance with the requirements of Article 11. B. Continue performing Work and adhere to the Progress Schedule during disputes or disagreements with Owner. Do not delay or postpone Work pending resolution of disputes or disagreements, or during an appeal process. 4.04 Delays in Contractor's Progress A. No Damages for Delay: Contractor shall receive no compensation for delays or hindrances to the Work,except in the case of direct interference with means and methods by the Owner. In no event shall the Contractor be entitled to any compensation or recovery of any special damages in connection with any delays, including without limitation: consequential damages, lost opportunity costs, impact damages, or other similar damages. Owner's exercise of any of its rights or remedies under the Contract Documents (including without limitation ordering changes in the Work, or directing suspension, rescheduling, or correction of the Work), regardless of the extent or frequency of Owner's exercise of such rights or remedies, shall not be construed as active interference in the Contractor's performance of the Work. An extension of Contract Time, to the extent permitted, shall be the sole remedy of the Contractor for any acknowledged delays.Contractor agrees that the extension of time provides an equitable adjustment. B. Contractor is not entitled to an adjustment in Contract Price or Contract Times for delays, disruptions, or interference caused by or within the control of Contractor's Team. C. No time extensions are allowed for weather conditions, other than those listed in Paragraph 4.04.D, for Projects using calendar days or a fixed date to establish the Contract Time. Contractor is to include the cost associated with weather related delays in the Contract Price and assumes the risks associated with delays related to weather conditions. D. Contractor is entitled to an equitable adjustment in the Contract Times if Contractor's performance or progress is delayed,disrupted or interfered with by unanticipated causes not the fault of and beyond the control of OPT or Contractor. These adjustments in Contract Times are the Contractor's sole and exclusive remedy for the delays, disruption, and interference described in this paragraph. These unanticipated causes may include: 1. Severe and unavoidable natural catastrophes e.g. fires, floods, hurricanes, epidemics, and earthquakes; 2. Acts or failures to act of utility owners performing other work at or adjacent to the Site; 3. Acts of war or terrorism; and 4. Rain days in excess of the number specified in a calendar year. General Conditions 00 72 00-21 Corpus Christi Standards Rev 6/2021 E. Delays, disruption, and interference to the performance or progress of the Work resulting from the following are governed by Article 5: 1. The existence of a differing subsurface or physical condition; 2. An Underground Facility not shown or not indicated with reasonable accuracy by the Contract Documents; and 3. Hazardous Environmental Conditions. F. Article 8 governs delays, disruption, and interference to the performance or progress of the Work resulting from the performance of certain other work at or adjacent to the Site. G. Notify the OAR immediately of a potential delaying, disrupting, or interfering event. Submit a Change Proposal seeking an adjustment in Contract Price or Contract Times within 30 days of the commencement of the delaying, disrupting, or interfering event. Claims for adjustment to the Contract Price or Contract Times that do not comply with Article 13 are waived. H. Contractor is only entitled to an adjustment of the Contract Times for specific delays, disruptions, and interference to the performance or progress of the Work that can be demonstrated to directly impact the ability of the Contractor to complete the Work within the Contract Times. No adjustments in Contract Times are allowed for delays on components of the Work which were or could have been completed without impacting the Contract Times. I. Contractor is not entitled to an adjustment in Contract Price or Contract Times for delay, disruption, or interference caused by or within the control of the Owner if this delay is concurrent with a delay, disruption, or interference attributable to or within the control of the Contractor's Team. ARTICLE 5—AVAILABILITY OF LANDS; SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS 5.01 Availability of Lands A. Owner is to furnish the Site and inform the Contractor of encumbrances or restrictions known to Owner related to use of the Site with which Contractor must comply in performing the Work. B. Provide for additional lands and access Contractor requires for temporary construction facilities or storage of materials and equipment, other than those identified in the Contract Documents. Provide documentation of authority to use these additional lands to OAR before using them. 5.02 Use of Site and Other Areas A. Limitation on Use of Site and Other Areas: 1. Confine construction equipment, temporary construction facilities, the storage of materials and equipment,and the operations of workers to the Site,adjacent areas that Owner or Contractor has arranged to use through construction easements or agreements, and other adjacent areas as permitted by Laws and Regulations. Assume General Conditions 00 72 00-22 Corpus Christi Standards Rev 6/2021 full responsibility for damage or injuries which result from the performance of the Work or from other actions or conduct of the Contractor's Team, including: a. Damage to the Site; b. Damage to adjacent areas used for Contractor's Team's operations; C. Damage to other adjacent land or areas; and d. Injuries and losses sustained by the owners or occupants of these lands or areas. 2. Take the following action if a damage or injury claim is made by the owner or occupant of adjacent land or area because of the performance of the Work, or because of other actions or conduct of the Contractor's Team: a. Take immediate corrective or remedial action as required by Paragraph 7.09; and b. Attempt to settle the claim through negotiations with the owner or occupant, or otherwise resolve the claim by mediation or other dispute resolution proceeding or at law. 5.03 Subsurface and Physical Conditions A. The Supplementary Conditions identify: 1. Those reports known to OPT of explorations and tests of subsurface conditions at or adjacent to the Site; 2. Those drawings known to OPT of physical conditions related to existing surface or subsurface structures at the Site, except Underground Facilities; and 3. Technical Data contained in these reports and drawings. B. Data contained in boring logs, recorded measurements of subsurface water levels, and the results of tests performed on materials described in geotechnical data reports specifically prepared for the Project and made available to Contractor are defined as Technical Data, unless Technical Data has been defined more specifically in the Supplementary Conditions. C. Contractor may rely upon the accuracy of the Technical Data contained in these reports and drawings, but these reports and drawings are not Contract Documents. Except for this reliance on Technical Data,Contractor may not rely upon or make claims against Owner with respect to: 1. The completeness of reports and drawings for Contractor's purposes, including aspects of the means, methods, techniques, sequences, and procedures of construction to be employed by Contractor, or Contractor's safety precautions and programs; 2. Other data, interpretations, opinions, and information contained in these reports or shown or indicated in the drawings; or 3. Contractor's interpretation of or conclusions drawn from Technical Data or other data, interpretations, opinions, or information. General Conditions 00 72 00-23 Corpus Christi Standards Rev 6/2021 5.04 Differing Subsurface or Physical Conditions A. Notify OAR immediately, but in no event later than 3 days, after becoming aware of a subsurface or physical condition that is uncovered or revealed at the Site, and before further disturbing the subsurface or physical conditions or performing any related Work that: 1. Establishes that the Technical Data on which Contractor is entitled to rely as provided in Paragraph 5.03 is materially inaccurate; 2. Requires a change in the Drawings or Specifications; 3. Differs materially from that shown or indicated in the Contract Documents; or 4. Is of an unusual nature and differs materially from conditions ordinarily encountered and generally recognized as inherent in work of the character provided for in the Contract Documents. Do not further disturb or perform Work related to this subsurface or physical condition, except in an emergency as required by Paragraph 7.12, until permission to do so is issued by OAR. B. OAR is to notify the OPT after receiving notice of a differing subsurface or physical condition from the Contractor. Designer is to: 1. Promptly review the subsurface or physical condition; 2. Determine the necessity of OPT's obtaining additional exploration or tests with respect to the subsurface or physical condition; 3. Determine if the subsurface or physical condition falls within one or more of the differing Site condition categories in Paragraph 5.04.A; 4. Prepare recommendations to OPT regarding the Contractor's resumption of Work in connection with the subsurface or physical condition in question; 5. Determine the need for changes in the Drawings or Specifications; and 6. Advise OPT of Designer's findings, conclusions, and recommendations. C. OAR is to issue a statement to Contractor regarding the subsurface or physical condition in question and recommend action as appropriate after review of Designer's findings, conclusions, and recommendations. D. Possible Contract Price and Contract Times Adjustments: 1. Contractor is entitled to an equitable adjustment in Contract Price or Contract Times to the extent that a differing subsurface or physical condition causes a change in Contractor's cost or time to perform the Work provided the condition falls within one or more of the categories described in Paragraph 5.04.A. Any adjustment in Contract Price for Work that is paid for on a unit price basis is subject to the provisions of Paragraph 15.03. General Conditions 00 72 00-24 Corpus Christi Standards Rev 6/2021 2. Contractor is not entitled to an adjustment in the Contract Price or Contract Times with respect to a subsurface or physical condition if: a. Contractor knew of the existence of the subsurface or physical condition at the time Contractor made an offer to Owner with respect to Contract Price and Contract Times; b. The existence of the subsurface or physical condition could have been discovered or revealed as a result of examinations, investigations, explorations, tests, or studies of the Site and contiguous areas expressly required by the Bidding Requirements or Contract Documents prior to when Contractor's Bid is submitted or when Contractor negotiates the Contract Price; or c. Contractor failed to give notice as required by Paragraph 5.04.A. 3. Contractor may submit a Change Proposal no later than 30 days after OAR's issuance of the OPT's statement to Contractor regarding the subsurface or physical condition in question. 4. A Change Order is to be issued by the OAR if Owner and Contractor agree that Contractor is entitled to an adjustment in the Contract Price or Contract Times and agree to the amount or extent of adjustments in the Contract Price or Contract Times. 5.05 Underground Facilities A. The information and data shown or indicated in the Contract Documents with respect to existing Underground Facilities at or adjacent to the Site is based on information and data furnished to OPT by the owners of these Underground Facilities or by others. OPT is not responsible for the accuracy or completeness of information or data provided by others that OPT makes available to Contractor. The Contractor is responsible for: 1. Investigating and field-verifying the location of underground facilities before beginning Work; 2. Reviewing and checking available information and data regarding existing Underground Facilities at the Site; 3. Complying with Laws and Regulations related to locating Underground Facilities before beginning Work; 4. Locating Underground Facilities shown or indicated in the Contract Documents; 5. Coordinating the Work with the owners, including Owner, of Underground Facilities during construction; and 6. The safety and protection of existing Underground Facilities at or adjacent to the Site and repairing damage resulting from the Work. B. Notify the OAR and the owner of the Underground Facility immediately, but in no event later than 3 days, if an Underground Facility is uncovered or revealed at the Site that was not shown in the Contract Documents or was not shown with reasonable accuracy in the Contract Documents. Do not further disturb conditions or perform Work affected by this discovery, except in the event of an emergency as required by Paragraph 7.12. General Conditions 00 72 00-25 Corpus Christi Standards Rev 6/2021 C. The Designer is to take the following action after receiving notice from the OAR: 1. Promptly review the Underground Facility and conclude whether the Underground Facility was not shown or indicated in the Contract Documents, or was not shown or indicated with reasonable accuracy; 2. Prepare recommendations to OPT regarding the Contractor's resumption of Work in connection with this Underground Facility; 3. Determine the extent to which a change is required in the Drawings or Specifications to document the consequences of the existence or location of the Underground Facility; and 4. Advise OAR of Designer's findings, conclusions, and recommendations and provide revised Drawings and Specifications if required. D. OAR is to issue a statement to Contractor regarding the Underground Facility in question and recommend action as appropriate after review of Designer's findings, conclusions, and recommendations. E. Contractor is entitled to an equitable adjustment in the Contract Price or Contract Times as provided in Paragraphs 11.04 and 11.05 to the extent that the existing Underground Facility at the Site that was not shown or indicated in the Contract Documents or was not shown or indicated with reasonable accuracy. Any adjustment in Contract Price for Work that is paid for on a unit price basis is subject to the provisions of Paragraph 15.03. F. Contractor is not entitled an adjustment in the Contract Price or Contract Times with respect to an existing Underground Facility at the Site if: 1. Contractor knew of the existence of the existing Underground Facility at the Site at the time Contractor made an offer to Owner with respect to Contract Price and Contract Times; 2. The existence of the existing Underground Facility at the Site could have been discovered or revealed as a result of examinations, investigations, explorations, tests, or studies of the Site and contiguous areas expressly required by the Bidding Requirements or Contract Documents prior to when Contractor's Bid is submitted or when Contractor negotiates the Contract Price; or 3. Contractor failed to give notice as required by Paragraph 5.05.B. G. Contractor may submit a Change Proposal regarding its entitlement to or the amount or extent of adjustments in the Contract Price or Contract Times no later than 30 days after OAR's issuance of OPT's statement to Contractor regarding the Underground Facility. 5.06 Hazardous Environmental Conditions at Site A. The Supplementary Conditions identify: 1. Those reports and drawings known to OPT relating to Hazardous Environmental Conditions that have been identified at or adjacent to the Site; and 2. Technical Data contained in these reports and drawings. B. Contractor may rely upon the accuracy of the Technical Data contained in reports and drawings relating to Hazardous Environmental Conditions identified in the Supplementary General Conditions 00 72 00-26 Corpus Christi Standards Rev 6/2021 Conditions, but these reports and drawings are not Contract Documents. Except for the reliance on expressly identified Technical Data,Contractor may not rely upon or make claims against Owner's Indemnitees with respect to: 1. The completeness of these reports and drawings for Contractor's purposes, including aspects of the means, methods,techniques, sequences and procedures of construction to be employed by Contractor or Contractor's safety precautions and programs related to Hazardous Environmental Conditions; 2. Other data, interpretations, opinions, and information contained in these reports or shown or indicated in the drawings; or 3. Any Contractor interpretation of or conclusion drawn from Technical Data or other data, interpretations, opinions or information. C. The results of tests performed on materials described in environmental reports specifically prepared for the Project and made available to Contractor are defined as Technical Data unless Technical Data has been defined more specifically in the Supplementary Conditions. D. Contractor is not responsible for removing or remediating Hazardous Environmental Conditions encountered, uncovered or revealed at the Site unless this removal or remediation is expressly identified in the Contract Documents to be within the scope of the Work. E. Contractor is responsible for controlling, containing, and duly removing and remediating Constituents of Concern brought to the Site by Contractor's Team and paying associated costs. 1. Owner may remove and remediate the Hazardous Environmental Condition and impose a set-off against payments to Contractor for associated costs if Contractor's Team creates a Hazardous Environmental Condition,and Contractor does not take acceptable action to remove and remediate the Hazardous Environmental Condition. 2. Contractor's obligation to indemnify Owner for claims arising out of or related to Hazardous Environmental Conditions are as set forth in Paragraph 7.14. F. Immediately notify the OAR and take the following action if Contractor uncovers or reveals a Hazardous Environmental Condition at the Site or adjacent areas used by the Contractor's Team that was not created by the Contractor's Team: 1. Secure or otherwise isolate this condition; 2. Stop Work in affected areas or connected with the condition, except in an emergency as required by Paragraph 7.12; and 3. Do not resume Work in connection with the Hazardous Environmental Condition or in affected areas until after OPT has obtained required permits and OAR sends notice to the Contractor: a. Specifying that this condition and affected areas are or have been rendered safe for the resumption of Work; or b. Specifying special conditions under which Work may be resumed safely. General Conditions 00 72 00-27 Corpus Christi Standards Rev 6/2021 4. Owner may order the portion of the Work that is in the area affected by the Hazardous Environmental Condition to be deleted from the Work following the procedures in Article 11 if Contractor does not agree to: a. Resume the Work based on a reasonable belief it is unsafe; or b. Resume the Work under the special conditions provided by the OAR. 5. Owner may have this deleted portion of the Work performed by Owner's own forces or others in accordance with Article 8. G. Contractor may submit a Change Proposal or Owner may impose a set-off if an agreement is not reached within 10 days of OAR's notice regarding the resumption of Work as to whether Contractor is entitled to an adjustment in Contract Price or Contract Times or on the amount or extent of adjustments resulting from this Work stoppage or special conditions under which Contractor agrees to resume Work. H. The provisions of Paragraphs 5.03, 5.04, and 5.05 do not apply to the presence of Constituents of Concern or a Hazardous Environmental Condition uncovered or revealed at the Site. ARTICLE 6—BONDS AND INSURANCE 6.01 Performance, Payment, and Other Bonds A. Furnish Performance and Payment Bonds, each in an amount equal to the Contract Price, as security for the faithful performance and payment of Contractor's obligations under the Contract Documents. These Bonds are to remain in effect until 1 year after the date of final payment. Furnish other Bonds as required by the Contract Documents. B. Bonds furnished by the Contractor must meet the requirements of Texas Insurance Code Chapter 3503, Texas Government Code Chapter 2253, and all other applicable Laws and Regulations. C. Notify OAR immediately if the surety on Bonds furnished by Contractor: 1. Is declared bankrupt, or becomes insolvent; 2. Has its right to do business in Texas terminated; or 3. Ceases to meet the requirements of Paragraph 6.02. Provide a Bond and surety which comply with the requirements of Paragraph 6.02 within 20 days after the event giving rise to this notification. D. Contractor is to use amounts paid by Owner to Contractor under the Contract for the performance of the Contract and to satisfy claims against the Payment Bond. E. Notify the OAR of claims filed against the Payment Bond. Notify the claimant and OAR of undisputed amounts and the basis for challenging disputed amounts when a claimant has satisfied the conditions prescribed by Texas Government Code Chapter 2253. Promptly pay undisputed amount. F. Owner is not liable for payment of costs or expenses of claimants under the Payment Bond. Owner has no obligations to pay, give notice or take other action to claimants under the Payment Bond. General Conditions 00 72 00-28 Corpus Christi Standards Rev 6/2021 G. Owner may exclude the Contractor from the Site and exercise Owner's termination rights under Article 18 if Contractor fails to obtain or maintain required Bonds. H. OPT will provide a copy of the Payment Bond to Subcontractors, Suppliers, or other persons or entities claiming to have furnished labor or materials used in the performance of the Work that request this information in accordance with Texas Government Code Chapter 2253. 6.02 Licensed Sureties A. Provide Bonds in the form prescribed by the Contract Documents from sureties named in the list of"Companies Holding Certificates of Authority as Acceptable Sureties on Federal Bonds and as Acceptable Reinsuring Companies" as published in Circular 570 (amended) by the Financial Management Service, Surety Bond Branch, U.S. Department of the Treasury. B. Provide Bonds required by the Contract Documents from surety companies that are duly licensed or authorized to provide bonds in the State of Texas. 6.03 Required Minimum Insurance Coverage A. Obtain and maintain insurance as required in this Article and in the Supplementary Conditions. B. Deliver evidence of insurance in accordance with the Supplementary Conditions to the Owner to demonstrate that Contractor has obtained and is maintaining the policies, coverages, and endorsements required by the Contract. Provide copies of these certificates to each named insured and additional insured as identified in the Supplementary Conditions or otherwise. 6.04 General Insurance Provisions A. Provide insurance coverages and limits meeting the requirements for insurance in accordance with this Article 6 and the Supplementary Conditions. B. Provide endorsements to the policies as outlined in this Article. C. Obtain insurance from companies that are duly licensed or authorized in the State of Texas to issue insurance policies for the required limits and coverages. Provide insurance from companies that have an A.M. Best rating of A-Vill or better. D. Furnish copies of endorsements and documentation of applicable self-insured retentions and deductibles upon request by OPT or any named insured or additional insured. Contractor may block out (redact) any confidential premium or pricing information contained in any endorsement furnished under this Contract. E. The name and number of the Project must be referenced on the certificate of insurance. F. OPT's failure to demand such certificates or other evidence of the Contractor's full compliance with the insurance requirements or failure to identify a deficiency in compliance from the evidence provided is not a waiver of the Contractor's obligation to obtain and maintain the insurance required by the Contract Documents. G. Notify the Owner if the Contractor fails to purchase or maintain the insurance required by the Contract Documents. Contractor shall not be allowed to perform any Work on the General Conditions 00 72 00-29 Corpus Christi Standards Rev 6/2021 Project until the required insurance policies are in effect. A Certificate of Liability Insurance shall be submitted to the OPT. H. Owner may exclude the Contractor from the Site and exercise Owner's termination rights under Article 18 if Contractor fails to obtain or maintain the required insurance. I. Owner does not represent that the insurance coverage and limits established in this Contract are adequate to protect Contractor or Contractor's interests. J. The required insurance and insurance limits do not limit the Contractor's liability under the indemnities granted to Owner in the Contract Documents. K. Provide for an endorsement that the "other insurance" clause shall not apply to the OPT where the OPT is an additional insured shown on the policy. Contractor's insurance is primary and non-contributory with respect to any insurance or self-insurance carried by the OPT for liability arising out of operations under this Contract. L. Include the Owner and list the other members of the OPT and any other individuals or entities identified in the Supplementary Conditions as additional insureds on all policies with the exception of the workers' compensation policy and Contractor's professional liability policy. 6.05 Contractor's Insurance A. Purchase and maintain workers' compensation and employer's liability insurance for: 1. Claims under workers' compensation, disability benefits, and other similar employee benefit acts. Obtain workers' compensation coverage through a licensed insurance company in accordance with Texas law and written on a policy and endorsements approved by the Texas Department of Insurance. Provide insurance in amounts to meet all workers' compensation obligations. Provide an "All Other States" endorsement if Contractor is not domiciled in Texas and policy is not written in accordance with Texas Department of Insurance rules. 2. Claims for damages because of bodily injury, occupational sickness or disease, or death of Contractor's employees. 3. United States Longshoreman and Harbor Workers' Compensation Act and Jones Act coverage (if applicable). 4. Foreign voluntary worker compensation (if applicable). B. Purchase and maintain commercial general liability insurance covering all operations by or on behalf of Contractor. The expected coverage is that which would be included in a commercially available ISO Commercial General Liability policy and should provide coverage on an occurrence basis, against: 1. Claims for damages because of bodily injury,sickness or disease,or death of any person other than Contractor's employees; 2. Claims for damages insured by reasonably available personal injury liability coverage which are sustained; 3. By any person as a result of an offense directly or indirectly related to the employment of such person by Contractor; and General Conditions 00 72 00-30 Corpus Christi Standards Rev 6/2021 4. Claims for damages,other than to the Work itself, because of injury to or destruction of tangible property wherever located, including any resulting loss of use. C. Provide Contractor's commercial general liability policy that is written on a 1996 (or later) ISO commercial general liability form (occurrence form) and include the following coverages and endorsements: 1. Products and completed operations coverage as required in this Article and the Supplementary Conditions. Insurance is to remain in effect for 3 years after final payment. Furnish evidence of the continuation of this insurance at final payment and again each year for 3 years after final payment to Owner and each named insured or additional insured. a. If required by the Supplementary Conditions, provide and maintain Installation Floater insurance for property under the care, custody, or control of Contractor. Provide Installation Floater insurance that is a broad form or "All Peril" policy providing coverage for all materials, supplies, machinery, fixtures, and equipment which will be incorporated into the Work. 1) Provide coverage under the Contractor's Installation Floater that includes: a) Faulty or Defective workmanship, materials, maintenance, or construction; b) Cost to remove Defective or damaged Work from the Site or to protect it from loss or damage; c) Cost to cleanup and remove pollutants; d) Coverage for testing and startup; e) Any loss to property while in transit; f) Any loss at the Site; g) Any loss while in storage, both on and off the Site; and h) Any loss to temporary Project Works if their value is included in the Contract Price. 2) Coverage cannot be contingent on an external cause or risk or limited to property for which the Contractor is legally liable. Provide limits of insurance adequate to cover the value of the installation. Pay any deductible carried under this coverage and assume responsibility for claims on materials, supplies, machinery, fixtures, and equipment which will be incorporated into the Work while in transit or in storage. 2. Blanket contractual liability coverage for Contractor's contractual indemnity obligations in Paragraph 7.14, and all other contractual indemnity obligations of Contractor in the Contract Documents. Industry standard ISO Contractual Liability coverage will meet this obligation. 3. Broad form property damage coverage. 4. Severability of interest. 5. Underground explosion and collapse coverage. General Conditions 00 72 00-31 Corpus Christi Standards Rev 6/2021 6. Personal injury coverage. 7. Endorsement CG 2032, "Additional Insured - Engineers, Architects or Surveyors Not Engaged by the Named Insured" or its equivalent. D. Purchase and maintain automobile liability insurance against claims for damages because of bodily injury or death of any person or property damage arising out of the ownership, maintenance or use of any motor vehicle. E. For Projects with a Contract Value that exceeds$5,000,000, purchase and maintain umbrella or excess liability insurance written over the underlying employer's liability, commercial general liability, and automobile liability insurance described in the paragraphs above. Provide coverage that is at least as broad as all underlying policies. Provide a policy that provides first-dollar liability coverage as needed. F. Provide Contractor's commercial general liability and automobile liability policies that: 1. Are written on an occurrence basis; 2. Include the individuals or entities identified in the Supplementary Conditions as additional insureds; 3. Include coverage for Owner as defined in Article 1; and 4. Provide primary coverage for all claims covered by the policies, including those arising from both ongoing and completed operations. G. Purchase and maintain insurance coverage for third-party injury and property damage claims, including clean-up costs that result from Hazardous Environmental Conditions which result from Contractor's operations and completed operations. Provide Contractor's pollution liability insurance that includes long-term environmental impacts for the disposal of pollutants/contaminants and is not limited to sudden and accidental discharge. The completed operations coverage is to remain in effect for 3 years after final payment. The policy must name OPT and any other individuals and entities identified in the Supplementary Conditions as additional insureds. H. Purchase and maintain applicable professional liability insurance, or have Subcontractors and Suppliers do so, if Contractor or any Subcontractor or Supplier will provide or furnish professional services under this Contract. I. The policies of insurance required by this Article must: 1. Include at least the specific coverages and be written for not less than the limits of liability provided in this Article or the Supplementary Conditions or required by Laws or Regulations,whichever is greater. 2. Contain a provision that coverage afforded will not be canceled or materially changed until at least 30 days prior written notice has been given to Contractor, Owner, and all named insureds and additional insureds. 3. Remain in effect at all times when Contractor is performing Work or is at the Site to conduct tasks arising from the Contract Documents. 4. Be appropriate for the Work being performed and provide protection from claims resulting from the Contractor's performance of the Work and Contractor's other obligations under the Contract Documents, whether performed by Contractor, General Conditions 00 72 00-32 Corpus Christi Standards Rev 6/2021 Subcontractor, Supplier, anyone directly or indirectly employed or retained by any of them, or by anyone for whose acts they may be liable. J. The coverage requirements for specific policies of insurance must be met directly by those policies and may not rely on excess or umbrella insurance provided in other policies to meet the coverage requirement. 6.06 Property Insurance A. Purchase and maintain builder's risk insurance in the amount of the full replacement cost of the Project. This policy is subject to the deductible amounts requirements in this Article and the Supplementary Conditions or those required by Laws and Regulations and must comply with the requirements of Paragraph 6.09. This insurance shall: 1. Include the OPT,Contractor,and all Subcontractors,and any other individuals or entities identified in the Supplementary Conditions, as named insureds. 2. Be written on a builder's risk "all risk" policy form that includes insurance for physical loss or damage to the Work, temporary buildings, falsework, and materials and equipment in transit, and insures against at least the following perils or causes of loss: fire; lightning; windstorm; riot; civil commotion; terrorism; vehicle impact; aircraft; smoke; theft; vandalism and malicious mischief; mechanical breakdown, boiler explosion, and artificially generated electric current; earthquake; volcanic activity, and other earth movement; flood; collapse; explosion; debris removal; demolition occasioned by enforcement of Laws and Regulations; water damage (other than that caused by flood); and such other perils or causes of loss as may be specifically required by this Section. If insurance against mechanical breakdown, boiler explosion, and artificially generated electric current; earthquake; volcanic activity, and other earth movement; or flood, are not commercially available under builder's risk, by endorsement or otherwise, this insurance may be provided through other insurance policies acceptable to Owner and Contractor. 3. Cover expenses incurred in the repair or replacement of any insured property. 4. Cover materials and equipment in transit or stored prior to being incorporated in the Work. 5. Cover Owner-furnished or assigned property. 6. Allow for partial utilization of the Work by Owner. 7. Allow for the waiver of the insurer's subrogation rights as set forth below. 8. Provide primary coverage for all losses and damages caused by the perils or causes of loss covered. 9. Not include a co-insurance clause. 10. Include a broad exception for ensuing losses from physical damage or loss with respect to any Defective workmanship, design, or materials exclusions. 11. Include testing and startup. 12. Be maintained in effect until the Work as a whole is complete, unless otherwise agreed to in writing by Owner and Contractor. General Conditions 00 72 00-33 Corpus Christi Standards Rev 6/2021 B. Evidence of insurance provided must contain a provision or endorsement that the coverage afforded will not be canceled or materially changed or renewal refused until at least 30 days' prior written notice has been given to Owner and Contractor and to each named insured. C. Pay for costs not covered by the policy deductible. D. Notify builder's risk insurance provider if Owner will occupy or use a portion or portions of the Work prior to Substantial Completion of all the Work. Maintain the builder's risk insurance in effect during this Partial Occupancy or Use. E. Contractor may purchase other special insurance to be included in or to supplement the builder's risk or property insurance policies provided under this Article and the Supplementary Conditions. F. Contractor, Subcontractors, or employees of the Contractor or a Subcontractor owning property items, such as tools, construction equipment, or other personal property not expressly covered in the insurance required by the Contract Documents are responsible for providing their own insurance. 6.07 Waiver of Rights A. Insurance shall include a waiver of subrogation in favor of the additional insureds identified in the Supplementary Conditions. B. All policies purchased in accordance with this Article are to contain provisions to the effect that the insurers have no rights of recovery against OPT, named insureds or additional insureds in the event of a payment for loss or damage. Contractor and insurers waive all rights against the Owner's Indemnities for losses and damages created by or resulting from any of the perils or causes of loss covered by these policies and any other applicable property insurance. None of these waivers extend to the rights Contractor has to the proceeds of insurance as trustee. C. Contractor is responsible for assuring that agreements with Subcontractors contain provisions that the Subcontractor waive all rights against Owner,Contractor, named insureds and additional insureds, and the officers, directors, members, partners, employees, agents, consultants, and subcontractors of each and any of them,for all losses and damages created by or resulting from any of the perils or causes of loss covered by builder's risk insurance and other property insurance. 6.08 Owner's Insurance for Project A. Owner is not responsible for purchasing and maintaining any insurance to protect the interest of the Contractor, Subcontractors, or others in the Work. The stated limits of insurance required are minimum only. Determine the limits that are adequate. These limits may be basic policy limits or any combination of basic limits and umbrella limits. In any event, Contractor is fully responsible for all losses arising out of, resulting from, or connected with operations under this Contract whether or not these losses are covered by insurance. The acceptance of evidence of insurance bythe OPT, named insureds,or additional insureds does not release the Contractor from compliance with the insurance requirements of the Contract Documents. General Conditions 00 72 00-34 Corpus Christi Standards Rev 6/2021 6.09 Acceptable Evidence of Insurance A. Provide evidence of insurance acceptable to the Owner with the executed Contract Documents. Provide the following as evidence of insurance: 1. Certificates of Insurance on an acceptable form; 2. Riders or endorsements to policies; and 3. Policy limits and deductibles. B. Provide a list of"Additional Insureds" for each policy. C. Provide evidence that waivers of subrogation are provided on all applicable policies. D. Provide evidence of requirements for 30 days' notice before cancellation or any material change in the policy's terms and conditions, limits of coverage, or change in deductible amount. 6.10 Certificate of Insurance A. Submit Certificates of Insurance meeting the following requirements: 1. Form has been filed with and approved by the Texas Department of Insurance under Texas Insurance Code §1811.101; or 2. Form is a standard form deemed approved by the Department under Texas Insurance Code §1811.101. 3. No requirements of this Contract may be interpreted as requiring the issuance of a certificate of insurance on a certificate of insurance form that has not first been filed with and approved by the Texas Department of Insurance. B. Include the name of the Project in the description of operations box on the certificate of insurance. 6.11 Insurance Policies A. If requested by the Owner, make available for viewing a copy of insurance policies, declaration pages and endorsements, and documentation of applicable self-insured retentions and deductibles. B. Contractor may block out (redact) any proprietary information or confidential premium pricing information contained in any policy or endorsement furnished under this Contract. 6.12 Continuing Evidence of Coverage A. Provide updated, revised, or new evidence of insurance in accordance this Article and the Supplementary Conditions prior to the expiration of existing policies. B. Provide evidence of continuation of insurance coverage at final payment and for the following 3 years. 6.13 Notices Regarding Insurance A. Notices regarding insurance are to be sent to the Owner at the following address: General Conditions 00 72 00-35 Corpus Christi Standards Rev 6/2021 City of Corpus Christi— Engineering Attn: Construction Contract Admin. P.O. Box 9277 Corpus Christi,TX 78469-9277 B. Submit questions regarding insurance requirements to the Construction Contract Administrator by calling 361-826-3530. 6.14 Texas Workers' Compensation Insurance Required Notice A. Definitions: 1. Certificate of coverage ("certificate") -A copy of a certificate of insurance, a certificate of authority to self-insure issued by the commission, or a coverage agreement (TWCC- 81, TWCC-82, TWCC-83, or TWCC-84), showing statutory workers' compensation insurance coverage for the person's or entity's employees providing services on a project, for the duration of the Project. 2. Duration of the Project-includes the time from the beginning of the Work on the Project until the Contractor's/person's Work on the Project has been completed and accepted by the governmental entity. 3. Persons providing services on the Project ("Subcontractor" in §406.096) - includes all persons or entities performing all or part of the services the Contractor has undertaken to perform on the Project, regardless of whether that person contracted directly with the Contractor and regardless of whether that person has employees. This includes, without limitation, independent contractors, subcontractors, leasing companies, motor carriers, owner-operators, employees of any such entity, or employees of any entity which furnishes persons to provide services on the Project. "Services" include, without limitation, providing, hauling, or delivering equipment or materials, or providing labor, transportation, or other service related to a project. "Services" does not include activities unrelated to the Project, such as food/beverage vendors, office supply deliveries, and delivery of portable toilets. B. The Contractor shall provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements, which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all employees of the Contractor providing services on the Project, for the duration of the Project. C. The Contractor must provide a certificate of coverage to the governmental entity prior to being awarded the Contract. D. If the coverage period shown on the Contractor's current certificate of coverage ends during the duration of the Project,the Contractor must, prior to the end of the coverage period,file a new certificate of coverage with the governmental entity showing that coverage has been extended. E. The Contractor shall obtain from each person providing services on a project, and provide to the governmental entity: 1. A certificate of coverage, prior to that person beginning Work on the Project, so the governmental entity will have on file certificates of coverage showing coverage for all persons providing services on the Project; and General Conditions 00 72 00-36 Corpus Christi Standards Rev 6/2021 2. No later than seven days after receipt by the Contractor, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project. F. The Contractor shall retain all required certificates of coverage for the duration of the Project and for one year thereafter. G. The Contractor shall notify the governmental entity in writing by certified mail or personal delivery,within 10 days after the Contractor knew or should have known,of any change that materially affects the provision of coverage of any person providing services on the Project. H. The Contractor shall post on each Project Site a notice, in the text, form and manner prescribed by the Texas Workers' Compensation Commission, informing all persons providing services on the Project that they are required to be covered, and stating how a person may verify coverage and report lack of coverage. I. The Contractor shall contractually require each person with whom it contracts to provide services on a project,to: 1. Provide coverage, based on proper reporting of classification codes and payroll amounts and filing of any coverage agreements,which meets the statutory requirements of Texas Labor Code, Section 401.011(44) for all of its employees providing services on the Project,for the duration of the Project; 2. Provide to the Contractor, prior to that person beginning Work on the Project, a certificate of coverage showing that coverage is being provided for all employees of the person providing services on the Project,for the duration of the Project; 3. Provide the Contractor, prior to the end of the coverage period, a new certificate of coverage showing extension of coverage, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; 4. Obtain from each other person with whom it contracts, and provide to the Contractor: a. A certificate of coverage, prior to the other person beginning Work on the Project; and b. A new certificate of coverage showing extension of coverage, prior to the end of the coverage period, if the coverage period shown on the current certificate of coverage ends during the duration of the Project; 5. Retain all required certificates of coverage on file for the duration of the Project and for one year thereafter; 6. Notify the governmental entity in writing by certified mail or personal delivery, within 10 days after the person knew or should have known, of any change that materially affects the provision of coverage of any person providing services on the Project; and 7. Contractually require each person with whom it contracts, to perform as required by this section, with the certificates of coverage to be provided to the person for whom they are providing services. J. By signing this Contract or providing or causing to be provided a certificate of coverage, the Contractor is representing to the governmental entity that all employees of the Contractor who will provide services on the Project will be covered by workers' compensation coverage for the duration of the Project, that the coverage will be based on proper reporting of General Conditions 00 72 00-37 Corpus Christi Standards Rev 6/2021 classification codes and payroll amounts, and that all coverage agreements will be filed with the appropriate insurance carrier or, in the case of a self-insured, with the commission's Division of Self-Insurance Regulation. Providing false or misleading information may subject the Contractor to administrative penalties, criminal penalties, civil penalties, or other civil actions. K. The Contractor's failure to comply with any of these provisions is a breach of contract by the Contractor which entitles the governmental entity to declare the Contract void if the Contractor does not remedy the breach within ten days after receipt of notice of breach from the governmental entity. ARTICLE 7—CONTRACTOR'S RESPONSIBILITIES 7.01 Supervision and Superintendence A. Supervise, inspect, and direct the performance of the Work in accordance with the Contract Documents. Contractor is solely responsible for the means, methods, techniques, sequences, and procedures of construction. B. Provide a competent resident superintendent acceptable to the OPT. The resident superintendent or acceptable qualified assistant is to be present at all times when Work is being done. Do not replace this resident superintendent except under extraordinary circumstances. Provide a replacement resident superintendent equally competent to the previous resident superintendent if replacement is required. Notify the Owner prior to replacing the resident superintendent and obtain Owner's consent to the change in superintendent. 7.02 Labor; Working Hours A. Provide competent,suitably qualified personnel to survey and lay out the Work and perform Work to complete the Project. Maintain good discipline and order at the Site. B. Perform Work at the Site during regular working hours except as otherwise required for the safety or protection of persons or the Work or property at the Site or adjacent to the Site and except as otherwise stated in the Contract Documents. Regular working hours are between sunrise and sundown Monday through Saturday unless other times are specifically authorized in writing by OAR. C. Do not perform Work on a Sunday or legal holiday without OAR's consent. The following legal holidays are observed by the Owner: Holiday Date Observed New Year's Day January 1 Martin Luther King Jr Day Third Monday in January Memorial Day Last Monday in May Independence Day July 4 Labor Day First Monday in September Thanksgiving Day Fourth Thursday in November General Conditions 00 72 00-38 Corpus Christi Standards Rev 6/2021 Holiday Date Observed Friday after Thanksgiving Friday after Thanksgiving Christmas Day December 25 D. If a legal holiday falls on a Saturday, it will be observed the preceding Friday. If a legal holiday falls on a Sunday, it will be observed the following Monday. E. Pay additional cost incurred by Owner for services of the OAR or RPR to observe Work constructed outside of regular working hours. OAR will issue a Set-off in the Application for Payment for this cost per Paragraph 17.01.13 7.03 Services, Materials, and Equipment A. Provide services, materials, equipment, labor, transportation, construction equipment and machinery, tools, appliances, fuel, power, light, heat, telephone, water, sanitary facilities, temporary facilities, and other facilities and incidentals necessary for the performance, testing, start-up, and completion of the Work, whether or not these items are specifically called for in the Contract Documents. B. Provide new materials and equipment to be incorporated into the Work. Provide special warranties and guarantees required by the Contract Documents. Provide satisfactory evidence, including reports of required tests, as to the source, kind, and quality of materials and equipment as required by the Contract Documents or as requested by the OAR. C. Store, apply, install, connect, erect, protect, use, clean, and condition materials and equipment in accordance with instructions of the applicable Supplier, unless otherwise required by the Contract Documents. 7.04 Concerning Subcontractors, Suppliers, and Others A. Contractor may retain Subcontractors and Suppliers for the performance of parts of the Work. All Subcontractors and Suppliers must be acceptable to Owner. B. Contractor must retain specific Subcontractors, Suppliers, or other individuals or entities for the performance of designated parts of the Work if required to do so by the Contract Documents. C. Submit a list of proposed Subcontractors and Suppliers to OAR prior to entering into binding subcontracts or purchase orders. These proposed Subcontractors or Suppliers are deemed acceptable to Owner unless Owner raises a substantive, reasonable objection within 30 days after receiving this list. Under no circumstances shall any Subcontractor debarred under Chapter 41 of The Code of Ordinances, City of Corpus Christi, be deemed acceptable to Owner. D. Contractor is not required to retain Subcontractors,Suppliers,or other individuals or entities to furnish or perform part of the Work after the Effective Date of the Contract if Contractor has reasonable objection. E. Owner may require the replacement of Subcontractors, Suppliers, or other individuals or entities retained by the Contractor. Provide an acceptable replacement for the rejected Subcontractor, Supplier, or other individual or entity. Owner also may require Contractor to retain specific replacements, subject to Contractor's reasonable objections. General Conditions 00 72 00-39 Corpus Christi Standards Rev 6/2021 F. Contractor may be entitled to an adjustment in Contract Price or Contract Times with respect to a replacement of Subcontractors, Suppliers, or other entities required by Owner. The Contractor is not entitled to an adjustment in Contract Price or Contract Time with respect to replacement of any individual deemed unsuitable by the OPT. Notify OAR immediately if a replacement of Subcontractors, Suppliers, or other entity increases the Contract Price or Contract Times. Initiate a Change Proposal for the adjustment within 10 days of Owner's notice to replace a Subcontractor,Supplier,or other entity retained by Contractor to perform part of the Work. Do not make the replacement until the change in Contract Price or Contract Times has been accepted by the Owner if Change Proposal is to be submitted. G. Owner's initial acceptance of Subcontractors, Suppliers, or other individuals or entities, or their replacements, does not constitute a waiver of the obligation of the Contractor to complete the Work in accordance with the Contract Documents. H. Maintain a current and complete list of Subcontractors and Suppliers that are to perform or furnish part of the Work. I. Contractor is fully responsible for the acts and omissions of Subcontractors, Suppliers, and other individuals or entities performing or furnishing Work. J. Contractor is solely responsible for scheduling and coordinating the work of Subcontractors, Suppliers, and other individuals or entities performing or furnishing Work. K. Require Subcontractors, Suppliers, and other individuals or entities performing or furnishing Work to communicate with OPT through Contractor. L. Contracts between the Contractor and their Subcontractors or Suppliers may specifically bind the Subcontractors or Suppliers to the applicable terms and conditions of the Contract Documents. Contractor is responsible for meeting the requirements of the Contract Documents if they choose to not bind the Subcontractors or Suppliers to applicable terms or conditions of the Contract Documents. 1. All Subcontractors employed on this Project must be required to obtain Workers' Compensation Insurance. 2. Proof of this insurance will be required prior to the start of any Work. M. OPT may furnish information about amounts paid to Contractor for Work provided by Subcontractors or Suppliers to the entity providing the Work. N. Nothing in the Contract Documents: 1. Creates a contractual relationship between members of the OPT and members of the Contractor's Team. 2. Creates an obligation on the part of the Owner to pay or to see to the payment of money due members of the Contractor's Team, except as may be required by Laws and Regulations. 7.05 Patent Fees and Royalties A. Pay license fees, royalties, and costs incident to the use of inventions, designs, processes, products, or devices which are patented or copyrighted by others in the performance of the Work, or to incorporate these inventions, designs, processes, products, or devices which are patented or copyrighted by others in the Work. The Contract Documents identify inventions, General Conditions 00 72 00-40 Corpus Christi Standards Rev 6/2021 designs, processes, products, or devices OPT knows are patented or copyrighted by others or that its use is subject to patent rights or copyrights calling for the payment of a license fee or royalty to others. Contractor is to include the cost associated with the use of patented or copyrighted products or processes, whether specified or selected by the Contractor, in the Contract Price. B. Contractor's obligation to indemnify Owner for claims arising out of or related to infringement of patent rights and copyrights are as set forth in Paragraph 7.14. 7.06 Permits A. Obtain and pay for construction permits and licenses. OPT is to assist Contractor in obtaining permits and licenses when required to do so by applicable Laws and Regulations. Pay governmental charges and inspection fees necessary for the prosecution of the Work which are applicable at the time the Contractor's Bid is submitted or when Contractor negotiates the Contract Price. This Project is not exempt from City permits and fees unless expressly stated otherwise. 7.07 Taxes A. Contractor is responsible for all taxes and duties arising out of the Work. The Owner generally qualifies as a tax exempt agency as defined by the statutes of the State of Texas and is usually not subject to any city or state sales or use taxes, however certain items such as rented equipment may be taxable even though Owner is a tax-exempt agency. Contractor is responsible for including in the Contract Price any applicable sales and use taxes and is responsible for complying with all applicable statutes and rulings of the State Comptroller. Pay sales, consumer, use, and other similar taxes required to be paid by Contractor in accordance with the Laws and Regulations. B. The Owner is exempt from the Federal Transportation and Excise Tax. Contractor must comply with all federal regulations governing the exemptions. C. Products incorporated into the Work are exempt from state sales tax according to the provisions of Subchapter H, Chapter 151, of the Texas Tax Code. D. Contractor may not include any amounts for sales, use, or similar taxes for which the Owner is exempt in the Contract Price or any proposed Change Order or Application for Payment. E. Obtain tax exemption certificates or other documentation necessary to establish Owner's exemption from such taxes. 7.08 Laws and Regulations A. Give required notices and comply with Laws and Regulations applicable to the performance of the Work. OPT is not responsible for monitoring Contractor's compliance with Laws or Regulations except where expressly required by applicable Laws and Regulations. B. Pay costs resulting from actions taken by Contractor that are contrary to Laws or Regulations. Contractor is not responsible for determining that the design aspects of the Work described in the Contract Documents is in accordance with Laws and Regulations. This does not relieve Contractor of its obligations under Paragraph 3.03. General Conditions 00 72 00-41 Corpus Christi Standards Rev 6/2021 C. Owner or Contractor may give notice to the other party of changes in Laws or Regulations that may affect the cost or time of performance of the Work, including: 1. Changes in Laws or Regulations affecting procurement of permits; and 2. Sales, use, value-added, consumption, and other similar taxes which come into effect after Contractor's Bid is submitted or when Contractor negotiates the Contract Price. D. Contractor may submit a Change Proposal or Owner may initiate a Claim within 30 days of this notice if Owner and Contractor are unable to agree on entitlement to or on the amount or extent of adjustments in Contract Price or Contract Times resulting from these changes. 7.09 Safety and Protection A. Contractor is solely responsible for initiating,maintaining,and supervising safety precautions and programs in connection with the Work. This responsibility does not relieve Subcontractors of their responsibility for the safety of persons or property in the performance of their work, nor for compliance with applicable safety Laws and Regulations. B. Take necessary precautions for the safety of persons on the Site or who may be affected by the Work, and provide the necessary protection to prevent damage, injury, or loss to: 1. Work and materials and equipment to be incorporated in the Work, whether stored on or off Site; and 2. Other property at or adjacent to the Site, including trees, shrubs, lawns, walks, pavements, roadways, structures, other work in progress, utilities, and Underground Facilities not designated for removal, relocation, or replacement in the course of construction. C. Comply with applicable Laws and Regulations relating to the safety and protection of persons or property. Erect and maintain necessary safeguards for safety and protection. Notify Owner; the owners of adjacent property, Underground Facilities, and other utilities; and other contractors and utility owners performing work at or adjacent to the Site when prosecution of the Work may affect them. Cooperate with them in the protection, removal, relocation, and replacement of their property or work in progress. 1. Comply with requirements of Underground Facility Damage Prevention and Safety Act, Texas Utilities Code Chapter 251. 2. Comply with all applicable safety rules and regulations of the Federal Occupational Health and Safety Act of 1970 and subsequent amendments (OSHA). D. Remedy damage, injury, or loss to property referred to in Paragraph 7.09.B caused by Contractor's Team. Pay remediation costs unless the damage or loss is: 1. Attributable to the fault of the Contract Documents; 2. Attributable to acts or omissions of OPT; or 3. Not attributable to the actions or failure to act of the Contractor's Team. E. Contractor's duties and responsibilities for safety and protection of persons or the Work or property at or adjacent to the Site continues until Work is completed and resumes whenever Contractor's Team returns to the Site to fulfill warranty or correction obligations or to conduct other tasks. General Conditions 00 72 00-42 Corpus Christi Standards Rev 6/2021 F. Comply with the applicable requirements of the Owner's safety program if required to do so in the Supplementary Conditions. A copy of the Owner's safety program will be provided in the Bidding Documents. 7.10 Safety Representative A. Provide a qualified and experienced safety representative at the Site whose duties and responsibilities are the prevention of accidents and maintaining and supervising safety programs. 7.11 Hazard Communication Programs A. Coordinate the exchange of material safety data sheets or other hazard communication information required to be made available or exchanged between or among employers at the Site in accordance with Laws or Regulations. 7.12 Emergencies A. Act to prevent threatened damage, injury or loss in emergencies affecting the safety or protection of persons or the Work or property at or adjacent to the Site. Notify OAR immediately if Contractor believes that significant changes in the Work or variations from the Contract Documents have been caused or are required as a result of this need to act. A Modification is to be issued by OAR if OPT determines that the incident giving rise to the emergency action was not the responsibility of the Contractor and that a change in the Contract Documents is required because of the action taken by Contractor in response to this emergency. 7.13 Contractor's General Warranty and Guarantee A. Contractor warrants and guarantees to Owner that Work is in accordance with the Contract Documents and is not Defective. Owner is entitled to rely on Contractor's warranty and guarantee. Assume and bear responsibility for costs and time delays associated with variations from the requirements of the Contract Documents. B. This Contractor's warranty and guarantee excludes defects or damage caused by improper maintenance or operation, abuse, or modification by OPT; or normal wear and tear under normal usage. C. Contractor's obligation to perform and complete Work in accordance with the Contract Documents is absolute. None of the following constitute an acceptance of Defective Work or a release of Contractor's obligation to perform Work in accordance with the Contract Documents: 1. Observations by OPT; 2. Recommendation by OAR to pay or payment by Owner of progress or final payments; 3. The issuance of a Certificate of Substantial Completion; 4. Use or occupancy of part of the Work by Owner; 5. Review and approval of a Shop Drawing or Sample; 6. Inspections,tests, or approvals by others; or General Conditions 00 72 00-43 Corpus Christi Standards Rev 6/2021 7. Correction of Defective Work by Owner. D. The Contract Documents may require the Contractor to accept the assignment of a contract between the Owner and a contractor or supplier. The specific warranties, guarantees, and correction obligations contained in an assigned contract govern with respect to Contractor's performance obligations to Owner for the Work described in an assigned contract. 7.14 INDEMNIFICATION A. To the fullest extent permitted by law, Contractor shall indemnify, defend, and hold harmless the Owner from and against claims, damages, losses and expenses, including but not limited to attorney's fees or dispute resolution costs, arising out of or resulting from performance of the Work and/or failure to comply with the terms and conditions of the contract, violations of Laws or Regulations, or bodily injury, death or destruction of tangible property caused by the acts, omissions or negligence of the Contractor's Team, regardless of whether such claim, damage, loss or expense is alleged to be caused in part by an Owner hereunder, subject to the Owner's defenses and liability limits under the Texas Tort Claims Act. However, nothing herein shall be construed to require Contractor to indemnify an Owner against a claim, loss, damage or expense caused by the sole negligence of an Owner. B. To the fullest extent permitted by law, Contractor shall indemnify, defend, and hold harmless the Owner from and against Indemnified Costs, arising out of or relating to: (i) the failure to control, contain, or remove a Constituent of Concern brought to the Site by Contractor's Team or a Hazardous Environmental Condition created by Contractor's Team, (ii) Contractor's Team's action or inaction related to damages, delays, disruptions or interference with the work of Owner's employees, other contractors, or utility owners performing other work at or adjacent to the Site, or (iii) the correction of Defective Work. Nothing in this paragraph obligates the Contractor to indemnify the Owner from the consequences of the Owner's sole negligence. c. To the fullest extent permitted by law, Contractor shall indemnify, defend, and hold harmless the Owner from and against Indemnified Costs resulting from infringement on patent rights or copyrights by Contractor's Team. General Conditions 00 72 00-44 Corpus Christi Standards Rev 6/2021 D. The indemnification obligations of this Paragraph 7.14 are not limited by the amount or type of damages, compensation or benefits payable by or for members of the Contractor's Team or other individuals or entities under workers' compensation acts, disability benefit acts, or other employee benefit acts in claims against Owner by an employee or the survivor or personal representative of employee of Contractor's Team. The indemnification obligations of this Paragraph 7.14 shall not be deemed to be released,waived or modified in any respect by reason of any surety or insurance provided by Contractor. E. The indemnification obligations of this Paragraph 7.14 do not extend to the liability of Designer arising out of the preparation of the Contract Documents or giving directions or instructions, or failing to give them, to the extent they are obligated to do so if that is the primary cause of the injury or damage. F. Notify the other party within 10 days if Owner or Contractor receives notice of any claim or circumstances that could give rise to an indemnified loss. The notice must include the following: 1. A description of the indemnification event in reasonable detail; 2. The basis on which indemnification may be due; and 3. The anticipated amount of the indemnified loss. This notice does not stop or prevent Owner from later asserting a different basis for indemnification or a different amount of indemnified loss than that indicated in the initial notice. Owner does not waive any rights to indemnification except to the extent that Contractor is prejudiced, suffers loss, or incurs expense because of the delay if Owner does not provide this notice within the 10-day period. G. Defense of Indemnification Claims: 1. Assume the defense of the claim with counsel chosen by the Contractor and pay related costs, unless Owner decides otherwise. Contractor's counsel must be acceptable to Owner. Control the defense and any negotiations to settle the claim. Advise Owner as to its defense of the claim within 10 days after being notified of the indemnification request. Owner may assume and control the defense if Contractor does not assume the defense. Pay all defense expenses of the Owner as an indemnified loss. 2. Owner may retain separate counsel to participate in, but not control, the defense and any settlement negotiations if Contractor defends the claim. Contractor may not settle the claim without the consent or agreement of Owner. Contractor may settle the claim with Owner's consent and agreement unless it: a. Would result in injunctive relief or other equitable remedies or otherwise require Owner to comply with restrictions or limitations that adversely affect Owner; b. Would require Owner to pay amounts that Contractor does not fund in full; or c. Would not result in Owner's full and complete release from all liability to the plaintiffs or claimants who are parties to or otherwise bound by the settlement. 7.15 Delegation of Professional Design Services A. Contractor is not required to provide professional design services unless these services are specifically required by the Contract Documents for a portion of the Work or unless these General Conditions 00 72 00-45 Corpus Christi Standards Rev 6/2021 services are required to carry out Contractor's responsibilities for construction means, methods, techniques, sequences, and procedures. Contractor is not required to provide professional services in violation of applicable Laws and Regulations. B. The Contract Documents specify performance and design criteria related to systems, materials or equipment if professional design services or certifications by a design professional related to systems, materials, or equipment are specifically required of Contractor. These services or certifications must be provided by the licensed Texas Professional Engineer or Registered Architect who prepares, signs, and seals drawings, calculations, specifications, certifications, Shop Drawings, and other documents. C. OPT is entitled to rely upon the adequacy, accuracy, and completeness of the services, certifications, or approvals performed by Contractor's design professionals, provided OPT has specified to Contractor the performance and design criteria that these services must satisfy. D. Pursuant to this Paragraph 7.15, Designer's review and approval of design calculations and design drawings is only for the limited purpose of checking for conformance with the performance and design criteria given and the design concepts expressed in the Contract Documents. Designer's review and approval of Shop Drawings and other documents is only for the purpose stated in the Contract Documents. E. Contractor is not responsible for the adequacy of the performance or design criteria specified by OPT. Advise OPT if the performance or design criteria are known or considered likely to be inadequate or otherwise deficient. ARTICLE 8—OTHER WORK AT THE SITE 8.01 Other Work A. Owner may arrange for other work at or adjacent to the Site which is not part of the Contractor's Work. This other work may be performed by Owner's employees or through other contractors. Utility owners may perform work on their utilities and facilities at or adjacent to the Site. Include costs associated with coordinating with entities performing other work or associated with connecting to this other work in the Contract Price if this other work is shown in the Contract Documents. B. OPT is to notify Contractor of other work prior to starting the work and provide any knowledge they have regarding the start of utility work at or adjacent to the Site to Contractor. C. Provide other contractors: 1. Proper and safe access to the Site; 2. Reasonable opportunity for the introduction and storage of materials and equipment; and 3. Reasonable opportunity to execute their work. D. Provide cutting, fitting, and patching of the Work required to properly connect or integrate with other work. Do not endanger the work of others by cutting, excavating, or otherwise altering the work of others without the consent of OAR and the others whose work will be affected. General Conditions 00 72 00-46 Corpus Christi Standards Rev 6/2021 E. Inspect the work of others and immediately notify OAR if the proper execution of part of Contractor's Work depends upon work performed by others and this work has not been performed or is unsuitable for the proper execution of Contractor's Work. Contractor's failure to notify the OAR constitutes an acceptance of this other work as acceptable for integration with Contractor's Work. This acceptance does not apply to latent defects or deficiencies in the work of others. F. Take adequate measures to prevent damages, delays, disruptions, or interference with the work of Owner, other contractors, or utility owners performing other work at or adjacent to the Site. 8.02 Coordination A. Owner has sole authority and responsibility for coordination of this other work unless otherwise provided in the Contract Documents. The Owner is to identify the entity with authority and responsibility for coordination of the activities of the various contractors, the limitations of their authority, and the work to be coordinated prior to the start of other work at or adjacent to the Site. 8.03 Legal Relationships A. Contractor may be entitled to a change in Contract Price or Contract Times if, while performing other work at or adjacent to the Site for Owner, the OPT or other contractor retained by the City: 1. Damages the Work or property of Contractor's Team; 2. Delays, disrupts, or interferes with the execution of the Work; or 3. Increases the scope or cost of performing the Work through their actions or inaction. B. Notify the OAR immediately of the event leading to a potential Change Proposal so corrective action can be taken. Submit the Change Proposal within 30 days of the event if corrective action has not adequately mitigated the impact of the actions or inactions of others. Information regarding this other work in the Contract Documents is used to determine if the Contractor is entitled to a change in Contract Price or Contract Times. Changes in Contract Price require that Contractor assign rights against the other contractor to Owner with respect to the damage, delay, disruption, or interference that is the subject of the adjustment. Changes in Contract Times require that the time extension is essential to Contractor's ability to complete the Work within the Contract Times. C. Take prompt corrective action if Contractor's Team damages, delays, disrupts, or interferes with the work of Owner's employees, other contractors, or utility owners performing other work at or adjacent to the Site or agree to compensate other contractors or utility owners for correcting the damage. Promptly attempt to settle claims with other contractors or utility owners if Contractor damages, delays, disrupts, or interferes with the work of other contractors or utility owners performing other work at or adjacent to the Site. D. Owner may impose a set-off against payments due to Contractor and assign the Owner's contractual rights against Contractor with respect to the breach of the obligations described in this Paragraph 8.03 to other contractors if damages, delays, disruptions, or interference occur. General Conditions 00 72 00-47 Corpus Christi Standards Rev 6/2021 E. Contractor's obligation to indemnify Owner for claims arising out of or related to damages, delays,disruptions,and interference with other work at the Site are as set forth in Paragraph 7.14. ARTICLE 9—OWNER'S AND OPT'S RESPONSIBILITIES 9.01 Communications to Contractor A. OPT issues communications to Contractor through OAR except as otherwise provided in the Contract Documents. 9.02 Replacement of Owner's Project Team Members A. Owner may replace members of the OPT at its discretion. 9.03 Furnish Data A. OPT is to furnish the data required of OPT under the Contract Documents. 9.04 Pay When Due A. Owner is to make payments to Contractor when due as described in Article 17. 9.05 Lands and Easements; Reports and Tests A. Owner's duties with respect to providing lands and easements are described in Paragraph 5.01. OPT will make copies of reports of explorations and tests of subsurface conditions and drawings of physical conditions relating to existing surface or subsurface structures at the Site available to Contractor in accordance with Paragraph 5.03. 9.06 Insurance A. Owner's responsibilities with respect to purchasing and maintaining insurance are described in Article 6. 9.07 Modifications A. Owner's responsibilities with respect to Modifications are described in Article 11. 9.08 Inspections,Tests, and Approvals A. OPT's responsibility with respect to certain inspections,tests, and approvals are described in Paragraph 16.02. 9.09 Limitations on OPT's Responsibilities A. The OPT does not supervise, direct, or have control or authority over, and is not responsible for Contractor's means, methods, techniques, sequences, or procedures of construction, or related safety precautions and programs, or for failure of Contractor to comply with Laws and Regulations applicable to the performance of the Work. OPT is not responsible for Contractor's failure to perform the Work in accordance with the Contract Documents. General Conditions 00 72 00-48 Corpus Christi Standards Rev 6/2021 9.10 Undisclosed Hazardous Environmental Condition A. OPT's responsibility for undisclosed Hazardous Environmental Conditions is described in Paragraph 5.06. 9.11 Compliance with Safety Program A. Contractor is to inform the OPT of its safety programs and OPT is to comply with the specific applicable requirements of this program. 9.12 Plans and Specifications A. Owner does not warrant the plans and specification. ARTICLE 10—OAR'S AND DESIGNER'S STATUS DURING CONSTRUCTION 10.01 Owner's Representative A. OAR is Owner's representative. The duties and responsibilities and the limitations of authority of OAR as Owner's representative are described in the Contract Documents. 10.02 Visits to Site A. Designer is to make periodic visits to the Site to observe the progress and quality of the Work. Designer is to determine, in general, if the Work is proceeding in accordance with the Contract Documents based on observations made during these visits. Designer is not required to make exhaustive or continuous inspections to check the quality or quantity of the Work. Designer is to inform the OPT of issues or concerns and OAR is to work with Contractor to address these issues or concerns. Designer's visits and observations are subject to the limitations on Designer's authority and responsibility described in Paragraphs 9.09 and 10.07. B. OAR is to observe the Work to check the quality and quantity of Work, implement Owner's quality assurance program, and administer the Contract as Owner's representative as described in the Contract Documents. OAR's visits and observations are subject to the limitations on OAR's authority and responsibility described in Paragraphs 9.09 and 10.07. 10.03 Resident Project Representatives A. Resident Project Representatives assist OAR in observing the progress and quality of the Work at the Site. The limitations on Resident Project Representatives' authority and responsibility are described in Paragraphs 9.09 and 10.07. 10.04 Rejecting Defective Work A. OPT has the authority to reject Work in accordance with Article 16. OAR is to issue a Defective Work Notice to Contractor and document when Defective Work has been corrected or accepted in accordance with Article 16. General Conditions 00 72 00-49 Corpus Christi Standards Rev 6/2021 10.05 Shop Drawings, Modifications and Payments A. Designer's authority related to Shop Drawings and Samples are described in the Contract Documents. B. Designer's authority related to design calculations and design drawings submitted in response to a delegation of professional design services are described in Paragraph 7.15. C. OAR and Designer's authority related to Modifications is described in Article 11. D. OAR's authority related to Applications for Payment is described in Articles 15 and 17. 10.06 Decisions on Requirements of Contract Documents and Acceptability of Work A. OAR is to render decisions regarding non-technical or contractual / administrative requirements of the Contract Documents and will coordinate the response of the OPT to Contractor. B. Designer is to render decisions regarding the conformance of the Work to the requirements of the Contract Documents. Designer will render a decision to either correct the Defective Work or accept the Work under the provisions of Paragraph 16.04 if Work does not conform to the Contract Documents. OAR will coordinate the response of the OPT to Contractor. C. Contractor may appeal Designer's decision by submitting a Change Proposal if Contractor does not agree with the Designer's decision. 10.07 Limitations on OAR's and Designer's Authority and Responsibilities A. OPT is not responsible for the acts or omissions of Contractor's Team. No actions or failure to act, or decisions made in good faith to exercise or not exercise the authority or responsibility available under the Contract Documents creates a duty in contract, tort, or otherwise of the OPT to the Contractor or members of the Contractor's Team. ARTICLE 11—AMENDING THE CONTRACT DOCUMENTS;CHANGES IN THE WORK 11.01 Amending and Supplementing the Contract Documents A. The Contract Documents may be modified by a Contract Amendment, Change Order, Work Change Directive, or Field Order. 1. Contract Amendment: Owner and Contractor may modify the terms and conditions of the Contract Documents without the recommendation of the Designer using a Contract Amendment. A Contract Amendment may be used for: a. Changes that do not involve: 1) The performance or acceptability of the Work; 2) The design as described in the Drawings, Specifications, or otherwise; or 3) Other engineering, architectural or technical matters. b. Authorizing new phases of the Work and establishing the Contract Price, Contract Times, or terms and conditions of the Contract for the new phase of Work when using phased construction or purchasing Goods and Special Services to be incorporated into the Project. General Conditions 00 72 00-50 Corpus Christi Standards Rev 6/2021 2. Change Order: All changes to the Contract Documents that include a change in the Contract Price or the Contract Times for previously authorized Work, or changes to the Work requiring Designer's approval must be made by a Change Order. A Change Order may also be used to establish modifications of the Contract Documents that do not affect the Contract Price or Contract Times. 3. Work Change Directive: A Work Change Directive does not change the Contract Price or the Contract Times, but is evidence that the parties expect that the modifications ordered or documented by a Work Change Directive will be incorporated in a subsequently issued Change Order following negotiations on the Contract Price and Contract Times. If negotiations under the terms of the Contract Documents governing adjustments, expressly including Paragraphs 11.04 and 11.05 are unsuccessful, Contractor must submit a Change Proposal seeking an adjustment of the Contract Price or the Contract Times no later than 30 days after the completion of the Work set out in the Work Change Directive. 4. Field Order: Designer may require minor changes in the Work that do not change the Contract Price or Contract Times using a Field Order. OAR may issue a Field Order for non-technical, administrative issues. Submit a Change Proposal if Contractor believes that a Field Order justifies an adjustment in the Contract Price or Contract Times before proceeding with the Work described in the Field Order. B. Perform added or revised Work under the applicable provisions of the Contract Documents for the same or similar Work unless different Drawings, Specifications or directions are provided in the Modification. 11.02 Owner-Authorized Changes in the Work A. Owner may order additions, deletions,or revisions in the Work at any time as recommended by the Designer to the extent the change: 1. Involves the design as described in the Contract Documents; 2. Involves acceptance of the Work; or 3. Involves other engineering, architectural or technical matters. B. These changes may be authorized by a Modification. Proceed with the Work involved or, in the case of a deletion in the Work, immediately cease construction activities with respect to the deleted Work upon receipt of the Modification. Nothing in this paragraph obligates the Contractor to undertake Work that Contractor reasonably concludes cannot be performed in a manner consistent with Contractor's safety obligations under the Contract Documents or Laws and Regulations. 11.03 Unauthorized Changes in the Work A. Contractor is not entitled to an increase in the Contract Price or an extension of the Contract Times with respect to Work performed that is not required by the Contract Documents, except in the case of an emergency as provided in Paragraph 7.12, or in the case of uncovering Work as provided in Paragraph 16.05. General Conditions 00 72 00-51 Corpus Christi Standards Rev 6/2021 B. Contractor is responsible for costs and time delays associated with variations from the requirements of the Contract Documents unless the variations are specifically approved by Change Order. 11.04 Change of Contract Price A. The Contract Price for authorized Work can only be changed by a Change Order. Any Change Proposal for an adjustment in the Contract Price must comply with the provisions of Paragraph 11.06. Any Claim for an adjustment of Contract Price must comply with the provisions of Article 13. B. An adjustment in the Contract Price is to be determined as follows: 1. By applying unit prices to the quantities of the items involved, subject to the provisions of Paragraph 15.03, where the Work involved is covered by unit prices in the Contract Documents; 2. By a mutually agreed lump sum where the Work involved is not covered by unit prices in the Contract Documents; or 3. Payment on the basis of the Cost of the Work determined as provided in Paragraph 15.01 plus a Contractor's fee for overhead and profit determined as provided in Paragraph 15.05 when the Work involved is not covered by unit prices in the Contract Documents and the parties do not reach a mutual agreement to a lump sum. C. The original Contract Price may not be increased by more than 25 percent or the limit set out in Texas Local Government Code 252.048 or its successor statute, whichever is greater. Owner may decrease the Work by up to 25 percent of the Contract Price. 11.05 Change of Contract Times A. The Contract Times for authorized Work can only be changed by Change Order. Any Change Proposal for an adjustment in the Contract Times must comply with the provisions of Paragraph 11.06. Any Claim for an adjustment in the Contract Times must comply with the provisions of Article 13. B. An adjustment of the Contract Times is subject to the limitations described in Paragraph 4.04. 11.06 Change Proposals A. Submit a Change Proposal in accordance with Article 12 to the OAR to: 1. Request an adjustment in the Contract Price or Contract Times; 2. Appeal an initial decision by OPT concerning the requirements of the Contract Documents or relating to the acceptability of the Work under the Contract Documents; 3. Contest a set-off against payment due; or 4. Seek other relief under the Contract Documents. General Conditions 00 72 00-52 Corpus Christi Standards Rev 6/2021 B. Notify the OAR within 3 days if a Change Proposal is to be submitted. Submit each Change Proposal to OAR no later than 30 days after the event initiating the Change Proposal. 11.07 Execution of Change Orders A. Owner and Contractor are to execute Change Orders covering: 1. Changes in the Contract Price or Contract Times, which are agreed to by Owner and Contractor, including undisputed sums or amount of time for Work actually performed in accordance with a Work Change Directive; 2. Changes in Contract Price resulting from Owner set-offs unless the set-off has been successfully challenged by Contractor; 3. Changes in the Work which are: a. Ordered by Owner pursuant to Paragraph 11.02.A, b. Required because Defective Work was accepted under Paragraph 16.04 or Owner's correction of Defective Work under Paragraph 16.07, or c. Agreed to by the Owner and Contractor; and 4. Changes in the Contract Price or Contract Times, or other changes under Paragraph 11.06 or Article 13. B. Acceptance of a Change Order by Contractor constitutes a full accord and satisfaction for any and all claims and costs of any kind, whether direct or indirect, including but not limited to impact, delay or acceleration damages arising from the subject matter of the Change Order. Each Change Order must be specific and final as to prices and extensions of time, with no reservations or other provisions allowing for future additional money or time as a result of the particular changes identified and fully compensated in the Change Order. The execution of a Change Order by Contractor constitutes conclusive evidence of Contractor's agreement to the ordered changes in the Work. This Contract, as amended, forever releases any claim against Owner for additional time or compensation for matters relating to or arising out of or resulting from the Work included within or affected by the executed Change Order. This release applies to claims related to the cumulative impact of all Change Orders and to any claim related to the effect of a change on unchanged Work. C. All Change Orders require approval by either the City Council or Owner by administrative action. The approval process requires a minimum of 45 days after submission in final form with all supporting data. Receipt of Contractor's submission by Owner constitutes neither acceptance nor approval of a Change Order, nor a warranty that the Change Order will be authorized by City Council or administrative action. The time required for the approval process may not be considered a delay and no extensions to the Contract Times or increase in the Contract Price will be considered or granted as a result of the process. Contractor may proceed with Work if a Work Change Directive is issued. D. If the Contractor refuses to execute a Change Order that is required to be executed under the terms of this Paragraph 11.07, the Change Order is deemed to be in full force as if executed by Contractor. Contractor may file a Claim for payment and/or time, pursuant to Article 13. General Conditions 00 72 00-53 Corpus Christi Standards Rev 6/2021 11.08 Notice to Surety A. Notify the surety of Modifications affecting the general scope of the Work, changes in the provisions of the Contract Documents,or changes in Contract Price or Contract Times. Adjust the amount of each Bond when Modifications change the Contract Price. ARTICLE 12—CHANGE MANAGEMENT 12.01 Requests for Change Proposal A. Designer will initiate Modifications by issuing a Request for a Change Proposal (RCP). 1. Designer will prepare a description of proposed Modifications. 2. Designer will issue the Request for a Change Proposal form to Contractor. A number will be assigned to the Request for a Change Proposal when issued. 3. Return a Change Proposal in accordance with Paragraph 12.02 to the Designer for evaluation by the OPT. 12.02 Change Proposals A. Submit a Change Proposal (CP) to the Designer for Contractor initiated changes in the Contract Documents or in response to a Request for Change Proposal. A Change Proposal must be submitted to the OAR no later than 30 days after the event initiating the Change Proposal. 1. Use the Change Proposal form provided. 2. Assign a number to the Change Proposal when issued. 3. Include with the Change Proposal: a. A complete description of the proposed Modification if Contractor initiated or proposed changes to the OPT's description of the proposed Modification. b. The reason the Modification is requested, if not in response to a Request for a Change Proposal. c. A detailed breakdown of the cost of the change if the Modification requires a change in Contract Price. The itemized breakdown is to include: 1) List of materials and equipment to be installed; 2) Man hours for classification; 3) Equipment used in construction; 4) Consumable supplies,fuels, and materials; 5) Royalties and patent fees; 6) Bonds and insurance; 7) Overhead and profit; 8) Field office costs; and 9) Other items of cost. General Conditions 00 72 00-54 Corpus Christi Standards Rev 6/2021 d. Provide the level of detail outlined in the paragraph above for each Subcontractor or Supplier actually performing the Work if Work is to be provided by a Subcontractor or Supplier. Indicate appropriate Contractor mark-ups for Work provided through Subcontractors and Suppliers. Provide the level of detail outline in the paragraph above for self-performed Work. e. Submit Change Proposals that comply with Article 15 for Cost of Work. f. Provide a revised schedule. Show the effect of the change on the Project Schedule and the Contract Times. B. Submit a Change Proposal to the OAR to request a Field Order. C. A Change Proposal is required for all substitutions or deviations from the Contract Documents. D. Request changes to products in accordance with Article 25. 12.03 Designer Will Evaluate Request for Modification A. OAR is to advise OPT regarding the Change Proposal. OPT is to review each Change Proposal and Contractor's supporting data, and within 30 days after receipt of the documents, direct the OAR to either approve or deny the Change Proposal in whole or in part. OAR is to issue a Change Order for an approved Change Proposal. The Contractor may deem the Change Proposal to be denied if OAR does not take action on the Change Proposal within 30 days and start the time for appeal of the denial under Article 13. 1. Change Orders and Contract Amendments will be sent to the Contractor for execution with a copy to the Owner recommending approval. A Work Change Directive may be issued if Work needs to progress before the Change Order or Contract Amendment can be authorized by the Owner. 2. Work Change Directives, Change Orders, and Contract Amendments can only be approved by the Owner. a. Work performed on the Change Proposal prior to receiving a Work Change Directive or approval of the Change Order or Contract Amendment is performed at the Contractor's risk. b. No payment will be made for Work on Change Orders or Contract Amendments until approved by the Owner. B. The Contractor may be informed that the Request for a Change Proposal is not approved and construction is to proceed in accordance with the Contract Documents. 12.04 Substitutions A. The products of the listed Suppliers are to be furnished where Specifications list several manufacturers but do not specifically list "or equal" or "or approved equal" products. Use of any products other than those specifically listed is a substitution. Follow these procedures for a substitution. B. Substitutions are defined as any product that the Contractor proposes to provide for the Project in lieu of the specified product. Submit a Change Proposal per Paragraph 12.02 along with a Shop Drawing as required by Article 25 to request approval of a substitution. General Conditions 00 72 00-55 Corpus Christi Standards Rev 6/2021 C. Prove that the product is acceptable as a substitute. It is not the Designer's responsibility to prove the product is not acceptable as a substitute. 1. Indicate on a point by point basis for each specified feature that the product is acceptable to meet the intent of the Contract Documents requirements. 2. Make a direct comparison with the specified Suppliers published data sheets and available information. Provide this printed material with the documents submitted. 3. The decision of the Designer regarding the acceptability of the proposed substitute product is final. D. Provide a written certification that, in making the substitution request,the Contractor: 1. Has determined that the substituted product will perform in substantially the same manner and result in the same ability to meet the specified performance as the specified product. 2. Will provide the same warranties and/or bonds for the substituted product as specified or as would be provided by the manufacturer of the specified product. 3. Will assume all responsibility to coordinate any modifications that may be necessary to incorporate the substituted product into the Project and will waive all claims for additional Work which may be necessary to incorporate the substituted product into the Project which may subsequently become apparent. 4. Will maintain the same time schedule as for the specified product. E. Pay for review of substitutions in accordance with Article 25. ARTICLE 13—CLAIMS 13.01 Claims A. Follow the Claims process described in this Article for the following disputes between Owner and Contractor: 1. Seeking an adjustment of Contract Price or Contract Times; 2. Contesting an initial decision by OAR concerning the requirements of the Contract Documents or the acceptability of Work under the Contract Documents; 3. Appealing OAR's decision regarding a Change Proposal; 4. Seeking resolution of a contractual issue that OAR has declined to address; or 5. Seeking other relief with respect to the terms of the Contract. B. Contractor shall be entitled to an extension of Contract Time for delays or disruptions due to unusually severe weather in excess of weather normally experienced at the job site, as determined from climatological data set forth by the National Weather Service and which affects the Project's critical path. Contractor shall bear the entire economic risk of all weather delays and disruptions. Contractor shall not be entitled to any increase in the Contract Price by reason of such delays or disruptions. Upon Contractor reaching Substantial Completion, Owner and Contractor shall look back at the entire duration of the calendar day Project and review the totality of what Contractor claims were unusually severe weather disruptions. If the Project was delayed or disrupted due to unusually severe weather in General Conditions 00 72 00-56 Corpus Christi Standards Rev 6/2021 excess of weather normally experienced over the entire duration of the Project, Contractor may make a Claim for an extension of the Contract Time for delays or disruptions due to unusually severe weather in excess of weather normally experienced at the job site, as determined from climatological data set forth by the National Weather Service and which affects the Project's critical path. Any time extension granted shall be non-compensatory. 13.02 Claims Process A. Claims must be initiated by written notice. Notice must conspicuously state that it is a notice of a Claim in the subject line or first sentence. Notice must also list the date of first occurrence of the claimed event. B. Except for Claims resulting from unusually severe weather, notice of a Claim by Contractor must be in writing and delivered to the Owner, Designer and the OAR within 14 days after the start of the event giving rise to the Claim. Failure by Contractor to submit written notice of a Claim within 14 days shall constitute a waiver of such Claim. C. Submit the complete Claim with supporting documentation to Owner no later than 60 days after the start of the event giving rise to the Claim (unless Designer allows additional time for claimant to submit additional or more accurate data in support of such Claim). The Claim must be signed and sworn to by Contractor, certifying that the Claim is made in good faith, that the supporting data is accurate and complete, and that to the best of Contractor's knowledge and belief,the relief requested accurately reflects the full compensation to which Contractor is entitled. Failure by Contractor to submit the Claim within 60 days shall constitute a waiver of such Claim. D. Any Claims by Contractor that are not brought within 90 days following the termination of the Contract are waived and shall be automatically deemed denied. E. Claims by Owner must be submitted by written notice to Contractor. F. The responsibility to substantiate a Claim rests with the entity making the Claim. Claims must contain sufficient detail to allow the other party to fully review the Claim. 1. Claims seeking an adjustment of Contract Price must include the Contractor's job cost report. Provide additional documentation as requested by OAR or Designer. 2. Claims seeking an adjustment of Contract Time must include a Time Impact Analysis and native schedule files in Primavera or MS Project digital format. Provide additional documentation as requested by OAR or Designer. G. Claims by Contractor against Owner and Claims by Owner against Contractor, including those alleging an error or omission by Designer but excluding those arising under Section 7.12,shall be referred initially to Designer for consideration and recommendation. H. Designer will review a Claim by Contractor within 30 days of receipt of the Claim and take one or more of the following actions: 1. Request additional supporting data from the party who made the Claim; 2. Issue a recommendation; 3. Suggest a compromise; or General Conditions 00 72 00-57 Corpus Christi Standards Rev 6/2021 4. Advise the parties that Designer is not able to make a recommendation due to insufficient information or a conflict of interest. I. If the Designer does not take any action, the Claim shall be deemed denied 30 days after receipt of the Claim. J. Following receipt of Designer's initial recommendation regarding a Claim,the Contractor and the Owner shall seek to resolve the Claim through the exchange of information and direct negotiations. If no agreement is reached within 90 days, the Claim shall be deemed denied. The Owner and Contractor may extend the time for resolving the Claim by mutual agreement. Notify OAR of any actions taken on a Claim. K. If the entity receiving a Claim approves the Claim in whole or in part or denies it in whole or in part, this action is final and binding unless the other entity invokes the procedure described in Article 22 for final resolution of disputes by filing a notice of appeal within 30 days after this action. L. If the Owner and Contractor reach a mutual agreement regarding a Claim, the results of the agreement or action on the Claim will be incorporated in a Change Order by the OAR to the extent they affect the Contract Documents, the Contract Price, or the Contract Times. M. Both parties shall continue to perform all obligations under the Agreement during the pendency of any dispute or disagreement relating to this Agreement, unless performance would be impracticable or impossible under the circumstances. N. Any failure of Contractor to comply with any of the foregoing conditions precedent with regard to any such Claim shall constitute a waiver of any entitlement to submit or pursue such Claim. O. Receipt and review of a Claim by City shall not be construed as a waiver of any defenses to the Claim available to the City under the Contract Documents or at law. ARTICLE 14—PREVAILING WAGE RATE REQUIREMENTS 14.01 Payment of Prevailing Wage Rates A. Contractor and any Subcontractors employed on this Project shall pay not less than the rates established by the Owner as required by Texas Government Code Chapter 2258. B. Contractor and its Subcontractors are required to pay Davis-Bacon Wage Rates. C. Contractor and its Subcontractors are required to pay laborers and mechanics an overtime rate of not less than one and one-half times the basic rate for all hours worked in excess of forty hours in a given workweek. 14.02 Records A. In accordance with Tex. Gov't Code§2258.024,the Contractor and its Subcontractors, if any, shall keep a record showing: 1. The name and occupation of each worker employed by the Contractor or Subcontractor in the construction of the Work; and 2. The actual per diem wages paid to each worker. General Conditions 00 72 00-58 Corpus Christi Standards Rev 6/2021 B. The record shall be open at all reasonable hours to inspection by the officers and agents of the Owner. 14.03 Liability; Penalty; Criminal Offense A. Tex. Gov't Code §2258.003 — Liability: An officer, agent, or employee of the Owner is not liable in a civil action for any act or omission implementing or enforcing Chapter 2258 unless the action was made in bad faith. B. Tex. Gov't Code §2258.023(b)— Penalty: Any Contractor or Subcontractor who violates the requirements of Chapter 2258,shall pay to the Owner,on whose behalf the Contract is made, $60 for each worker employed on each calendar day or part of the day that the worker is paid less than the wage rates stipulated in the Contract. C. Tex. Gov't Code §2258.058—Criminal Offense: 1. An officer, agent, or representative of the Owner commits an offense if the person willfully violates or does not comply with a provision of Chapter 2258. 2. Any Contractor or Subcontractor, or an agent or representative of the Contractor or Subcontractor, commits an offense if the person violates Tex. Gov't Code §2258.024. 3. An offense is punishable by: a. A fine not to exceed $500; b. Confinement in jail for a term not to exceed 6 months; or c. Both a fine and confinement. 14.04 Prevailing Wage Rates A. Use the Prevailing Wage Rates specified in the Supplementary Conditions. ARTICLE 15—COST OF THE WORK;ALLOWANCES; UNIT PRICE WORK 15.01 Cost of the Work A. The Cost of the Work is the sum of costs described in this Paragraph 15.01, except those excluded in Paragraph 15.01.D, necessary for the proper performance of the Work. The provisions of this Paragraph 15.01 are used for two distinct purposes: 1. To determine Cost of the Work when Cost of the Work is a component of the Contract Price under cost-plus, time-and-materials, or other cost-based terms; or 2. To determine the value of a Change Order, Change Proposal, Claim, set-off, or other adjustment in Contract Price. B. Contractor is entitled only to those additional or incremental costs required because of the change in the Work or because of the event giving rise to the adjustment when the value of the adjustment is determined on the basis of the Cost of the Work. General Conditions 00 72 00-59 Corpus Christi Standards Rev 6/2021 C. Costs included in the Cost of the Work may not exceed the prevailing costs in the proximate area of the Site for similar work unless agreed to by the Owner. Cost of the Work includes only the following items: 1. Payroll costs for Contractor's employees performing the Work, including one foreman per crew, and other required and agreed upon personnel for the time they are employed on the Work. Employees are to be paid according to wage rates for job classifications as agreed to by Owner. Where the Cost of the Work is being used under provisions of Paragraph 15.01.A.2, rates paid for this Work are to be the same as paid for Contract Work as established by certified payroll. Payroll costs may include: a. Actual costs paid for salaries and wages; b. Actual cost paid for fringe benefits, which may include: 1) Social security contributions, 2) Unemployment, 3) Excise and payroll taxes, 4) Workers' compensation, 5) Health and retirement benefits, 6) Bonuses, and 7) Paid time off for sick leave,vacations, and holidays; and c. Actual cost of additional compensation paid for performing Work outside of regular working hours, on Sunday or legal holidays, to the extent authorized by Owner. 2. Cost of materials and equipment furnished and incorporated in the Work, including transportation and storage costs and required Suppliers'field services. Contractor may retain cash discounts unless Owner provided funds to the Contractor for early payment of these materials and equipment. Cash discounts are to be credited to Owner if the Owner provides funds for early payment. Make provisions for trade discounts, rebates, refunds, and returns from sale of surplus materials and equipment and reduce the Cost of the Work by these amounts. 3. Payments made by Contractor to Subcontractors for Work performed by Subcontractors. Obtain competitive bids from Subcontractors acceptable to Owner unless Owner agrees to use Subcontractors proposed by the Contractor. Bids are to be opened in the presence of the OAR and other designated members for the OPT. Provide copies of bids to the OAR to use in determining,with the OPT,which bids are acceptable. The Subcontractor's Cost of the Work and fee are determined in the same manner as Contractor's Cost of the Work and fee as provided in this Paragraph 15.01 if the subcontract provides that the Subcontractor is to be paid on the basis of Cost of the Work plus a fee. 4. Supplemental costs including the following: a. The proportion of necessary transportation, travel, and subsistence expenses of Contractor's employees incurred in discharge of duties connected with the Work; b. Costs of materials, supplies, equipment, machinery, appliances, office, and temporary facilities at the Site including transportation and maintenance costs; General Conditions 00 72 00-60 Corpus Christi Standards Rev 6/2021 c. Costs of hand tools not owned by the workers consumed in the performance of the Work. Costs of hand tools not owned by the workers which are used but not consumed in the performance of the Work and which remain the property of Contractor, less their market value when Work is completed; d. For Contractor-and Subcontractor-owned machinery,trucks, power tools or other equipment, use the FHWA rental rates found in the Rental Rate Blue Book ("Blue Book") multiplied by the regional adjustment factor and the rate adjustment factor to establish hourly rates. Use the rates in effect for each section of the Blue Book at the time of use. Payment will be made for the actual hours used in the Work. 1) Standby costs will be paid at SO% of the FHWA rental rates found in the Blue Book if Contractor is directed by Owner in writing to standby. Standby costs will not be allowed during periods when the equipment would otherwise have been idle. For a six-day work week, no more than eight hours per a 24-hour day, no more than 48 hours per week and no more than 208 hours per month shall be paid of standby time. Operating costs shall not be charged by Contractor. e. Rental of construction equipment, including the costs of transporting, loading, unloading, assembling, dismantling, and removing construction equipment, whether rented from Contractor or others, in accordance with rental agreements approved by Owner. Costs for rental of equipment will not be paid when the equipment is no longer necessary for the Work. Justify idle time for equipment by demonstrating that it was necessary to keep equipment on Site for related future Work; 1) The hourly rate shall be determined by dividing the actual invoice cost by the actual number of hours the equipment is involved in the Work. Owner reserves the right to limit the hourly rate to comparable Blue Book rates. 2) If Contractor is directed to standby in writing by Owner, standby costs will be paid at the invoice daily rate excluding operating costs, which includes fuel, lubricants, repairs and servicing. f. Applicable sales, consumer, use, and other similar taxes related to the Work for which the Owner is not exempt, and which Contractor pays consistent with Laws and Regulations; g. Deposits lost for causes other than negligence of Contractor's Team; h. Royalty payments and fees for permits and licenses; i. Cost of additional utilities,fuel, and sanitary facilities at the Site; j. Minor expense items directly required by the Work; and k. Premiums for Bonds and insurance required by the Contract Documents. D. The Cost of the Work does not include the following items: 1. Payroll costs and other compensation of Contractor's officers, executives, principals of partnerships and sole proprietorships, general managers, safety managers, superintendents, engineers, architects, estimators, attorneys, auditors, accountants, purchasing and contracting agents, expediters, clerks, and other personnel employed General Conditions 00 72 00-61 Corpus Christi Standards Rev 6/2021 by Contractor, whether at the Site or in Contractor's principal or branch office, for general administration of the Work and not specifically included in the agreed upon schedule of job classifications referred to in Paragraph 15.01.C.1 or specifically covered by Paragraph 15.01.C.4. These administrative costs are covered by the Contractor's fee. 2. Office expenses other than Contractor's office at the Site. 3. Any part of Contractor's capital expenses, including interest on Contractor's capital employed for the Work and charges against Contractor for delinquent payments. 4. Costs due to the actions of Contractor's Team for the correction of Defective Work, disposal of materials or equipment that do not comply with Specifications, and correcting damage to property. 5. Losses, damages, and related expenses caused by damage to the Work or sustained by Contractor in connection with the performance of the Work. Contractor is entitled to recover costs if covered by insurance provided in accordance with Article 6. Such losses may include settlements made with the approval of Owner. Do not include these losses, damages, and expenses in the Cost of the Work when determining Contractor's fee. 6. Any Indemnified Cost paid with regard to Contractor's indemnification of Owner. 7. Other overhead or general expense costs and the costs of items not described in Paragraphs 15.01.C. E. The Contractor's fee for profit and overhead is determined as follows: 1. In accordance with the Agreement when the Work is performed on a cost-plus basis; 2. A mutually acceptable fixed fee; or 3. A fee based on the following percentages of the various portions of the Cost of the Work: a. The Contractor's fee is 15 percent for costs incurred under Paragraphs 15.01.C.1, 15.01.C.2 and 15.01.C.4; b. The Contractor's fee is 5 percent for costs incurred under Paragraph 15.01.C.3; C. Fees are to be determined as follows where one or more tiers of subcontracts are used: 1) The Subcontractor's fee is 15 percent for costs incurred under Paragraphs 15.01.C.1 and 15.01.C.2 forthe Subcontractor that actually performs the Work at whatever tier; 2) The Subcontractor's fee is 5 percent for costs incurred under Paragraph 15.01.C.4 for the Subcontractor that actually performs the Work at whatever tier; and 3) The Contractor and Subcontractors of a tier higher than that of the Subcontractor that actually performs the Work are to be allowed a fee of 5 percent of the fee plus underlying costs incurred by the next lower tier Subcontractor. d. No fee is payable on the basis of costs itemized under Paragraph 15.01.D; General Conditions 00 72 00-62 Corpus Christi Standards Rev 6/2021 e. Five percent of the net decrease in the cost is to be deducted for changes which result in a net decrease in Contract Price; and 4. The adjustment in Contractor's fee is based on the net change in accordance with Paragraphs 15.05.13.1 through 15.05.13.5, inclusive when both additions and credits are involved in any one change. F. Establish and maintain records in accordance with generally accepted accounting practices and submit these records, including an itemized cost breakdown together with supporting data, in a form and at intervals acceptable to OAR whenever the Cost of the Work is to be determined pursuant to this Paragraph 15.01. 15.02 Allowances A. Include allowances specified in the Contract Documents in the Contract Price and provide Work covered by the allowance as authorized by the Owner through the OAR. B. Contractor agrees that: 1. The cash allowance is used to compensate the Contractor for the cost of furnishing materials and equipment for the Work covered by the allowance item in the Contract Documents. Cost may include applicable taxes. Make provisions for trade discounts, rebates, and refunds and reduce the allowance costs by these amounts. 2. Contractor's costs for unloading and handling on the Site, labor, installation, overhead, profit, and other expenses contemplated for the cash allowances have been included in the Contract Price and not in the allowances; and 3. Costs for cash allowances and installation costs as described in Paragraphs 15.02.13.1 and 15.02.13.2 above are included in the Contract Price. C. OAR will issue a Change Order to adjust the Contract Price by the difference between the allowance amount and the actual amount paid by Contractor for Work covered by the allowance. The Change Order will be issued at the time costs are incurred by Contractor for Work covered by the allowance and this Work is included on the Application for Payment. 15.03 Unit Price Work A. The initial Contract Price for Unit Price Work is equal to the sum of the unit price line items in the Agreement. Each unit price line item amount is equal to the product of the unit price for each line item times the estimated quantity of each item as indicated in the Contract. B. The estimated quantities of items of Unit Price Work are not guaranteed and are solely for the purpose of comparing Bids and determining an initial Contract Price. Payments to Contractor for Unit Price Work are to be based on actual quantities measured for Work in place. C. Each unit price is deemed to include an amount considered by Contractor to be adequate to cover Contractor's overhead and profit for each separately identified item. D. OAR is to determine the actual quantities and classifications of Unit Price Work performed by Contractor to be incorporated into each Application for Payment. OAR's decision on actual quantities is final and binding, subject to the provisions of Paragraph 15.03.E. General Conditions 00 72 00-63 Corpus Christi Standards Rev 6/2021 E. Contractor may submit a Change Proposal,or Owner may file a Claim,seeking an adjustment in the Contract Price within 30 days of OAR's decision under Paragraph 15.03.D, if: 1. The total cost of a particular item of Unit Price Work amounts to 20 percent or more of the total Contract Price and the variation in the quantity of that particular item of Unit Price Work performed by the Contractor differs by more than 20 percent from the estimated quantity of an item indicated in the Contract; 2. There is no corresponding adjustment with respect to other items of Work; and 3. Contractor believes it has incurred additional expense as a result of this condition or Owner believes that the quantity variation entitles Owner to an adjustment in the Contract Price. 15.04 Contingencies A. Contingency funds may be included in the Contract Price to pay for Work not defined specifically by the Contract Documents that is essential to the completion of the Project. Contingency funds will be as described in the Contract. B. The contingency funds may be used for costs incurred by the Contractor provided these costs are approved by the Owner. Costs are to be determined and documented in accordance with Paragraph 15.01. The contingency funds are not to be used for the following items: 1. Cost overruns due to changes in material costs after the Contract Price is established, unless specific price escalation provisions are made in the Contract. 2. Rework required to correct Defective Work. 3. Inefficiencies in completing the Work due to the Contractor's selected means, methods, sequences, or procedures of construction. 4. Work Contractor failed to include in the Contract Price. 5. Changes required by changes in Laws and Regulations enacted after the Contract Price is established. 6. Any Work that does not constitute a change in Scope in the Work included in the Contract Price. C. OAR is to issue a Change Order for approved expenditures from contingency funds. When the Change Order is issued, the costs are to be added to the Application for Payment. Contractor is to maintain a tabulation showing the contingency amount, adjustments to the contingency amount, and amounts remaining as the Project progresses. D. Any contingency amounts that are not included in a Change Order are retained bythe Owner. A Change Order will be issued to deduct unused contingency amounts from the Contract Price prior to Final Payment. General Conditions 00 72 00-64 Corpus Christi Standards Rev 6/2021 ARTICLE 16—TESTS AND INSPECTIONS;CORRECTION,REMOVAL,OR ACCEPTANCE OF DEFECTIVE WORK 16.01 Access to Work A. Provide safe access to the Site and the Work for the observation, inspection, and testing of the Work in progress. Contractor can require compliance with Contractor's safety procedures and programs as part of providing safe access. 16.02 Tests, Inspections and Approvals A. OPT may retain and pay for the services of an independent inspector, testing laboratory, or other qualified individual or entity to perform inspections. Notify OAR when the Work is ready for required inspections and tests. Provide adequate notice to allow for coordination with entities providing inspection or testing as determined by the OAR. Cooperate with inspection and testing personnel and assist with providing access for required inspections, tests, and handling test specimens or Samples. B. Arrange for and facilitate inspections, tests, and approvals required by Laws or Regulations of governmental entities having jurisdiction that require Work to be inspected, tested, or approved by an employee or other representative of that entity. Pay associated costs and furnish OAR with the required certificates of inspection or approval. C. Arrange, obtain, and pay for inspections and tests required: 1. By the Contract Documents, unless the Contract Documents expressly allocate responsibility for a specific inspection or test to OPT; 2. To attain OPT's acceptance of materials or equipment to be incorporated in the Work; 3. By manufacturers of equipment furnished under the Contract Documents; 4. For testing, adjusting, and balancing of mechanical, electrical, and other equipment to be incorporated into the Work; 5. For acceptance of materials, mix designs, or equipment submitted for approval prior to Contractor's purchase thereof for incorporation in the Work; 6. For re-inspecting or retesting Defective Work, including any associated costs incurred by the testing laboratory for cancelled tests or standby time; and 7. For retesting due to failed tests. D. Provide independent inspectors, testing laboratories, or other qualified individuals or entities acceptable to OPT to provide these inspections and tests. 16.03 Defective Work A. It is Contractor's obligation to ensure that the Work is not Defective. B. OPT has the authority to determine whether Work is Defective and to reject Defective Work. C. OAR is to notify Contractor of Defective Work of which OPT has actual knowledge. D. Promptly correct Defective Work. E. Take no action that would void or otherwise impair Owner's special warranties or guarantees when correcting Defective Work. General Conditions 00 72 00-65 Corpus Christi Standards Rev 6/2021 F. Pay claims, costs, losses,and damages arising out of or relating to Defective Work, including: 1. Costs for correction, removal, and replacement of Defective Work; 2. Cost of the inspection and testing related to correction of Defective Work; 3. Fines levied against Owner by governmental authorities because of Defective Work; and 4. Costs of repair or replacement of work of others resulting from Defective Work. 16.04 Acceptance of Defective Work A. Owner may elect to accept Defective Work instead of requiring correction or removal and replacement of Defective Work provided: 1. This acceptance occurs prior to final payment; 2. Designer confirms that the Defective Work is in general accordance with the design intent and applicable engineering or architectural principles; and 3. Designer confirms that acceptance of the Defective Work does not endanger public health or safety. B. Owner may impose a reasonable set-off against payments due under Article 17 for costs associated with OPT's evaluation of Defective Work to determine if it can be accepted and to determine the diminished value of the Work. Owner may impose a reasonable set-off against payments due under Article 17 if the parties are unable to agree as to the decrease in the Contract Price to compensate Owner for the diminished value of Defective Work accepted. OAR is to issue a Modification for acceptance of the Defective Work prior to final payment. Pay an appropriate amount to Owner if the acceptance of Defective Work occurs after final payment. 16.05 Uncovering Work A. OPT has the authority to require inspection or testing of the Work, whether or not the Work is fabricated, installed or completed. B. Work that is covered prior to approval of the OAR must be uncovered for OPT's observation if requested by OAR. Pay for uncovering Work and its subsequent restoration unless Contractor has given OAR timely notice of Contractor's intention to cover the Work and OAR fails to act with reasonable promptness in response to this notice. C. Provide necessary labor, material, and equipment and uncover, expose, or otherwise make available the portion of the Work suspected of being Defective for observation, inspection, or testing if OPT considers it necessary or advisable that covered Work be observed by Designer or inspected or tested by others as directed by the OAR. 1. Pay for claims, costs, losses, and damages associated with uncovering, exposing, observing, inspecting, and testing if it is found that the uncovered Work is Defective. Pay costs for correction of Defective Work. Pay for reconstruction, repair, or replacement of work of others resulting from the Defective Work if it is found that the uncovered Work is Defective. General Conditions 00 72 00-66 Corpus Christi Standards Rev 6/2021 16.06 Owner May Stop the Work A. Owner may order Contractor to stop the Work if: 1. The Work is Defective; 2. Contractor fails to supply sufficient skilled workers or suitable materials or equipment; or 3. Contractor performs Work that may fail to conform to the Contract Documents when completed. This stop work order is to remain in effect until the reason for the stop work order has been eliminated. Owner's right to stop the Work does not create a duty to exercise this right for the benefit of Contractor's Team or surety. 16.07 Owner May Correct Defective Work A. Owner may remedy deficiencies in the Work after 7 days' notice to Contractor if: 1. Contractor fails to correct Defective Work, or to remove and replace rejected Work as required by OPT; 2. Contractor fails to perform the Work in accordance with the Contract Documents; or 3. Contractor fails to comply with other provisions of the Contract Documents. B. Owner may: 1. Exclude Contractor from the Site; 2. Take possession of the Work and suspend Contractor's services related to the Work; and 3. Incorporate stored materials and equipment in the Work. C. Allow OPT access to the Site and off-Site storage areas to enable Owner to exercise the rights and remedies under this Paragraph 16.07. D. All claims, costs, losses, and damages incurred or sustained by Owner in exercising the rights and remedies under this Paragraph 16.07 are to be charged against Contractor as a set-off against payments due under Article 17. These claims, costs, losses, and damages include costs of repair and the cost of replacement of work of others destroyed or damaged by correction, removal, or replacement of Contractor's Defective Work. E. Contractor is not allowed an extension of the Contract Times because of delays in the performance of the Work attributable to the exercise of the Owner's rights and remedies under this Paragraph 16.07. ARTICLE 17—PAYMENTS TO CONTRACTOR;SET-OFFS;COMPLETION; CORRECTION PERIOD 17.01 Progress Payments A. Progress payment requests are to be submitted to the OAR on the Application for Payment form provided by the OAR following procedures in this Article 17. General Conditions 00 72 00-67 Corpus Christi Standards Rev 6/2021 1. Progress payments for lump sum Work are to be paid on the basis of the earned value to date at the amounts shown in the Schedule of Values submitted as required by Paragraph 17.03. Final payment will be for the total lump sum amount. 2. Progress payments for Unit Price Work are based on the number of units completed as determined under the provisions of Paragraph 15.03. 3. Progress payments for Work to be paid on the basis of the Cost of the Work per Paragraphs 15.01, 15.02 and 15.04 are to be paid for Work completed by Contractor during the pay period. B. Reduction in Payment by Owner: 1. Owner is entitled to impose a set-off against payment based on the following: a. Claims made against Owner or costs, losses,or damages incurred by Owner related to: 1) Contractor's conduct in the performance of the Work, including, but not limited to, workplace injuries, non-compliance with Laws and Regulations, or patent infringement; or 2) Contractor's failure to take reasonable and customary measures to avoid damage, delay, disruption, and interference with other work at or adjacent to the Site, including but not limited to, workplace injuries, property damage, and non-compliance with Laws and Regulations. b. Owner has been required to remove or remediate a Hazardous Environmental Condition for which Contractor is responsible; c. Work is Defective, or completed Work has been damaged by Contractor's Team, requiring correction or replacement; d. Owner has been required to correct Defective Work or complete Work in accordance with Paragraph 16.07; e. The Contract Price has been reduced by Change Orders; f. Events have occurred that would constitute a default by Contractor justifying a termination for cause; g. Liquidated damages have accrued as a result of Contractor's failure to achieve Milestones, Substantial Completion, or completion of the Work; h. Liens have been filed in connection with the Work, except where Contractor has delivered a specific Bond satisfactory to Owner to secure the satisfaction and discharge of these Liens; i. Failure to submit up-to-date record documents as required by the Contract Documents; j. Failure to submit monthly Progress Schedule updates or revised schedules as requested by the OAR; k. Failure to provide Project photographs required by the Contract Documents; I. Failure to provide Certified Payroll required by the Contract Documents; General Conditions 00 72 00-68 Corpus Christi Standards Rev 6/2021 m. Compensation for OPT for overtime charges of OAR or RPR, third review of documents, review of substitutions, re-inspection fees, inspections or designs related to correction of Defective Work, or other services identified as requiring payment by the Contractor; n. Costs for tests performed by the Owner to verify that Work previously tested and found to be Defective has been corrected; o. OPT has actual knowledge of the occurrence of events that would constitute a default by Contractor and therefore justify termination for cause under the Contract Documents with associated cost impacts; p. Other items entitling Owner to a set-off against the amount recommended; or q. Payment would result in an over-payment of the Contract Price. 2. Compensation for services of OPT staff is to be at the rates established by negotiations between OPT and Contractor. 3. OAR is to notify Contractor stating the amount and the reasons for an imposed set-off. The Owner is to pay the Contractor amounts remaining after deduction of the set-off. Owner is to pay the set-off amount agreed to by Owner and Contractor if Contractor remedies the reasons for the set-off. Contractor may submit a Change Proposal contesting the set-off. C. Delayed Payments: 1. No money shall be paid by Owner upon any claim, debt, demand, or account whatsoever, to any person, firm, or corporation who is in arrears to Owner for taxes; and Owner shall be entitled to counterclaim and automatically offset against any such debt, claim,demand, or account in the amount of taxes so in arrears and no assignment or transfer of such debt, claim, demand, or account after said taxes are due, shall affect the right of Owner to offset said taxes, and associated penalties and interest if applicable, against the same. 2. No payment will be made for Work authorized by a Work Change Directive until the Work Change Directive is incorporated into a Change Order. Payment can be included in an Application for payment when the Change Order is approved. D. The Owner is to pay the amount of payment recommended by the OAR within 30 days after receipt of the Application for Payment and accompanying documentation from the OAR. 17.02 Application for Payment A. Submit Applications for Payment for completed Work and for materials and equipment in accordance with the Supplementary Conditions, the Agreement, and this Article 17. The Contract Price is to include costs for: 1. Providing the Work in accordance with the Contract Documents; 2. Installing Owner furnished equipment and materials; 3. Providing Work for Alternates and Allowances; 4. Commissioning, start-up,training and initial maintenance and operation; 5. Acceptance testing in manufacturer's facilities or on Site; General Conditions 00 72 00-69 Corpus Christi Standards Rev 6/2021 6. All home office overhead costs and expenses, including profit made directly or indirectly for the Project; 7. Project management, Contract administration, field office, and field operations staff, including supervision, clerical support, and technology system support; 8. Professional services including design fees, legal fees, and other professional services; 9. Bonds and insurance; 10. Permits, licenses, patent fees, and royalties; 11. Taxes; 12. Providing all documents and Samples required by the Contract Documents; 13. Facilities and equipment at the Site including: a. Field offices, office furnishings, and all related office supplies, software, and equipment, b. Storage facilities for Contractor's use, storage facilities for stored materials and equipment, including spare parts storage, c. Shops, physical plant, construction equipment, small tools, vehicles, technology and telecommunications equipment, d. Safety equipment and facilities to provide safe access and working conditions for workers and for others working at the Site, e. Temporary facilities for power and communications, f. Potable water and sanitation facilities, and g. Mobilization and demobilization for all of these facilities and equipment; 14. Products, materials, and equipment stored at the Site or other suitable location; 15. Products, materials, and equipment permanently incorporated into the Project; 16. Temporary facilities for managing water, including facilities for pumping, storage, and treatment as required for construction and protection of the environment; 17. Temporary facilities for managing environment conditions and Constituents of Concern; 18. Temporary facilities such as sheeting, shoring, bracing, formwork, embankments, storage facilities, working areas, and other facilities required for construction of the Project; 19. Temporary and permanent facilities for protection of all overhead, surface, or underground structures or features; 20. Temporary and permanent facilities for removal, relocation, or replacement of any overhead, surface, or underground structures or features; 21. Products, materials, and equipment consumed during the construction of the Project; 22. Contractor labor and supervision to complete the Project, including that provided through Subcontractors or Suppliers; General Conditions 00 72 00-70 Corpus Christi Standards Rev 6/2021 23. Correcting Defective Work during the Contract Times, during the Correction Period, or as required to meet any warranty provision of the Contract Documents; 24. Risk associated with weather and environmental conditions, start-up, and initial operation of facilities including equipment, processes, and systems; 25. Contractor's safety programs, including management, administration, and training; 26. Maintenance of facilities, including equipment, processes, and systems until operation is transferred to Owner; 27. Providing warranties, extended or special warranties, or extended service agreements; 28. Cleanup and disposal of any and all surplus materials; and 29. Demobilization of all physical,temporary facilities not incorporated into the Project. B. Include the cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the Contract Price. C. Provide written approval of the surety company providing Bonds for the Schedule of Values, Application for Payment form, and method of payment prior to submitting the first Application for Payment. Payment will not be made without this approval. D. OAR may withhold processing Applications for Payment if any of the following processes or documentation are not up to date: 1. Record Documents per Article 20. 2. Progress Schedule per Article 27. 3. Project photographs per Article 28. 4. Documentation required to comply with Owner's Minority / MBE / DBE Participation Policy. 5. Documentation required to substantiate any approved Project deviation, including overruns of Designer's estimated quantity. 6. Documentation required by funding agency, if applicable. 17.03 Schedule of Values A. Submit a detailed Schedule of Values for the Work at least 10 days prior to submitting the first Application for Payment. B. Submit the Schedule of Values in the form attached to the Application for Payment - Tabulation of Earned Value of Original Contract Performed. C. Do not submit an Application for Payment until the Schedule of Values has been approved by the OAR. D. If unit prices are included in the Contract, use each unit price line item in the Contract as a unit price line item in the Schedule of Values. E. Divide lump sum line items, including Subcontractor and Supplier amounts in the Schedule of Values into smaller components to allow more accurate determination of the earned value for each item. General Conditions 00 72 00-71 Corpus Christi Standards Rev 6/2021 1. Provide adequate detail to allow a more accurate determination of the earned value expressed as a percentage of Work completed for each item. 2. Line items may not exceed $50,000.00, unless they are for products, materials or equipment permanently incorporated into the Project that cannot be subdivided into units or subassemblies. 3. Lump sum items may be divided into an estimated number of units to determine earned value. a. The estimated number of units times the cost per unit must equal the lump sum amount for that line item. b. Contractor will receive payment for the lump sum for the line item, regardless of the number of units installed, unless an adjustment is made by Change Order. 4. Include Contractor's overhead and profit in each line item in proportion to the value of the line item to the Contract Price. 5. Include the cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the Contract Price for each item. 6. These line items may be used to establish the value of Work to be added or deleted from the Project. 7. The sum of all values listed in the schedule must equal the total Contract Price. F. Subdivide each line item in the Schedule of Values into two payment components. The first component is the direct cost for products, materials, and equipment permanently incorporated into the Project. The second component is all other costs associated with the item in the Contract. The sum of the two components must equal the value of the line item in the Schedule of Values. G. Where a percentage of the line value is allowed for a specified stage of completion,show the value for each stage of completion as a component of that line item cost. 17.04 Schedule of Anticipated Payments and Earned Value A. Submit a schedule of the anticipated Application for Payments showing the application numbers, submission dates, and the anticipated amount to be requested. Incorporate retainage into the development of this schedule of anticipated payments. B. Submit a tabulation of the anticipated Total Earned Value of Fees, Work, and Materials to create a graphic (curve) representation of the anticipated progress on the Project each month. Adjust this table and curve to incorporate Modifications. Use this curve to compare actual progress on the Project each month by comparing the anticipated cumulative Total Earned Value of Fees, Work, and Materials to the actual Total Earned Value of Fees, Work, and Materials each month. Use the comparison of values to determine performance on budget and schedule. C. Update the Schedule of Payments as necessary to provide a reasonably accurate indication of the funds required to make payments each month to the Contractor for Work performed. General Conditions 00 72 00-72 Corpus Christi Standards Rev 6/2021 17.05 Basis for Payments A. Lump Sum Contracts: 1. Payment will be made for the earned value of Work completed during the payment period expressed as a percentage of Work completed for each line item during the payment period per the Contract Documents. 2. Payment amount is the value of Work completed per the Contract Documents multiplied by the percentage of Work completed. 3. Payment for lump sum items divided into an estimated number of units to determine earned value per Paragraph 17.03 will be made for the measured number of units. 4. Payment for stored materials and equipment will be made per Paragraph 17.06. B. Unit Price Contracts: 1. Payment will be made for the actual quantity of Work completed during the payment period and for materials and equipment stored during the payment period per the Contract Documents. a. Payment amount is the Work quantity measured per the Contract Documents multiplied by the unit prices for that line item in the Contract. b. Payment for stored materials and equipment will be made per Paragraph 17.06. 2. Measure the Work described in the Contract for payment. Payment will be made only for the actual measured and/or computed length, area, solid contents, number, and weight, unless other provisions are made in the Contract Documents. Payment on a unit price basis will not be made for Work outside finished dimensions shown in the Contract Documents. Include cost for waste, overages, and tolerances in the unit price for that line item. 17.06 Payment for Stored Materials and Equipment A. Store materials and equipment properly at the Site. 1. Payment will be made for the invoice amount less the specified retainage. 2. Payment for materials and equipment shown in the Application for Payment and attachments will be made for the invoice amount,up to the value shown in the Schedule of Values for that line item. Costs for material and equipment in excess of the value shown in the Schedule of Values may not be added to other line items. 3. Payment will be made in full for the value shown in the line item for products and materials if invoices for materials and equipment are less than the amount shown in the line item and it can be demonstrated that no additional materials or equipment are required to complete Work described in that item. 4. Provide invoices at the time materials are included on the Application for Payment and attachments. Include invoice numbers so that a comparison can be made between invoices and amounts included on the Application for Payment and attachments. B. Provide a bill of sale, invoice, or other documentation warranting that Owner has received the materials and equipment free and clear of Liens. Provide documentation of payment for General Conditions 00 72 00-73 Corpus Christi Standards Rev 6/2021 materials and equipment with the next Application for Payment. Adjust payment to the amount actually paid if this differs from the invoice amount. Remove items from the tabulation of materials and equipment if this documentation is not provided. Payment will not be made for material and equipment without documentation of payment. C. Contractors can be paid for non-perishable materials on hand stored at the site, provided that invoices are furnished to the City for verification of the material value, and that Contractor provides documents, satisfactory to the City,that show that the material supplier has been paid for the materials delivered to the work site. D. Provide evidence that the materials and equipment are covered by appropriate property insurance or other arrangements to protect Owner's interest. E. The Work covered by progress payments becomes the property of the Owner at the time of payment. The Contractor's obligations with regard to proper care and maintenance, insurance, and other requirements are not changed by this transfer of ownership until accepted in accordance with the General Conditions. F. Payment for materials and equipment does not constitute acceptance of the product. 17.07 Retainage and Set-Offs A. Retainage will be withheld from each Application for Payment per the Agreement. Retainage will be released per the General Conditions. B. Reduce payments for set-offs per the General Conditions. Include the appropriate attachment to the Application for Payment. 17.08 Procedures for Submitting an Application for Payment A. Submit a draft Application for Payment to the OAR each month at least 20 days before the date established in the Contract for Owner to make progress payments. Do not submit Applications for Payment more often than monthly. Review the draft Application for Payment with the OAR to determine concurrence with: 1. The earned value for each lump sum item including the value of properly stored and documented materials and equipment for each item in the original Contract. 2. The quantity of Work completed for each unit price item. 3. Set-offs included in the Application for Payment. 4. Values requested for materials and equipment consistent with invoices for materials and equipment. B. Submit Applications for Payment monthly through the OAR after agreement has been reached on the draft Application for Payment. 1. Number each application sequentially and include the dates for the application period. 2. Show the total amounts for earned value of original Contract performed, earned value for Work on approved Contract Amendments and Change Orders, retainage, and set- offs. Show total amounts that correspond to totals indicated on the attached tabulation for each. General Conditions 00 72 00-74 Corpus Christi Standards Rev 6/2021 3. Include Attachment A to show the earned value on each line item in the Schedule of Values for Work shown in the original Contract. 4. Include Attachment B to show the earned value on line items for approved Change Orders. Add items to Attachment B as Change Orders are approved. Change Orders must be approved before payment can be made on Change Order items. 5. Include Attachment C to document set-offs required per the Contract Documents. Show each set-off as it is applied. Show a corresponding line item to reduce the set-off amount if a payment held by a set-off is released for payment. 6. Include Attachment D to allow tracking of invoices used to support amounts requested as materials in Attachments A and B. Enter materials to show the amount of the invoice assigned to each item in Attachment A or B if an invoice includes materials used on several line items. 7. Complete the certification stating that all Work, including materials and equipment, covered by this Application for Payment have been completed or delivered and stored in accordance with the Contract Documents,that all amounts have been paid for Work, materials, and equipment for which previous payments have been made by the Owner, and that the current payment amount shown in this Application for Payment is now due. C. Submit attachments in Portable Document Format (PDF): 1. Generate attachments to the Application for Payment using the Excel spreadsheet provided. 2. Submit PDF documents with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. 17.09 Responsibility of Owner's Authorized Representative A. OAR will review draft Application for Payment with Contractor to reach an agreement on the values that will be recommended for payment by the OAR. B. OAR will review Application for Payment submitted by Contractor to determine that the Application for Payment has been properly submitted and is in accordance with the agreed to draft Application for Payment. C. OAR is to either recommend payment of the Application for Payment to Owner or notify the Contractor of the OPT's reasons for not recommending payment. Contractor may make necessary corrections and resubmit the Application for Payment if it is not recommended within 10 days after receipt of the notice. OAR will review resubmitted Application for Payment and reject or recommend payment of the Application for Payment to Owner as appropriate. D. OAR's recommendation of the Application for Payment constitutes a representation by OPT that based on their experience and the information available: 1. The Work has progressed to the point indicated; 2. The quality of the Work is generally in accordance with the Contract Documents; and 3. Requirements prerequisite to payment have been met. General Conditions 00 72 00-75 Corpus Christi Standards Rev 6/2021 E. This representation is subject to: 1. Further evaluation of the Work as a functioning whole; 2. The results of subsequent tests called for in the Contract Documents; or 3. Any other qualifications stated in the recommendation. F. OPT does not represent by recommending payment: 1. Inspections made to check the quality or the quantity of the Work as it has been performed have been exhaustive, extended to every aspect of the Work in progress, or involved detailed inspections of the Work; or 2. Other matters or issues between the parties that might entitle Contractor to additional compensation or entitle Owner to withhold payment to Contractor may or may not exist. G. Neither OPT's review of Contractor's Work for the purposes of recommending payments nor OAR's recommendation of payment imposes responsibility on OPT: 1. To supervise, direct, or control the Work; 2. For the means, methods, techniques, sequences, or procedures of construction, or safety precautions and programs; 3. For Contractor's failure to comply with Laws and Regulations applicable to Contractor's performance of the Work; 4. To make examinations to ascertain how or for what purposes Contractor has used the monies paid on account of the Contract Price; or 5. To determine that title to the Work, materials, or equipment has passed to Owner free and clear of Liens. 17.10 Contractor's Warranty of Title A. Contractor warrants and guarantees that title to the Work, materials, and equipment furnished under the Contract is to pass to Owner free and clear of Liens, title defects, and patent, licensing, copyright, or royalty obligations no later than 7 days after the time of payment by Owner of the Application for Payment which includes these items. 17.11 Substantial Completion A. Notify OAR when Contractor considers the entire Work substantially complete and request a Certificate of Substantial Completion. B. OPT is to inspect the Work within 30 days after Contractor's notification to determine if the Work is substantially complete. OAR, within 120 days after receipt of Contractor's notification, is to either issue the Certificate of Substantial Completion which sets the date of Substantial Completion or notify Contractor of the reasons the Project is not considered to be substantially complete. General Conditions 00 72 00-76 Corpus Christi Standards Rev 6/2021 C. The OPT and Contractor are to meet to discuss Owner's use or occupancy of the Work following Substantial Completion. Items to be discussed at this meeting include: 1. Review of insurance policies with respect to the end of the Contractor's coverage, and confirm the transition to coverage of the Work under a permanent property insurance policy held by Owner; 2. Owner's assumption of responsibility for security, operation, protection of the Work, maintenance, and utilities upon Owner's use or occupancy of the Work; 3. Contractor's obligations for operations and maintenance during performance and acceptance testing; 4. Contractor's access to the Site to complete punch list items; and 5. Procedures for correction of Defective Work during the 1-year correction period. 17.12 Partial Utilization A. Owner may use or occupy substantially completed parts of the Work which are specifically identified in the Contract Documents, or which OPT and Contractor agree constitutes a separately functioning and usable part of the Work prior to Substantial Completion of the Work. Owner must be able to use that part of the Work for its intended purpose without significant interference with Contractor's performance of the remainder of the Work. Contractor and OPT are to follow the procedures of Paragraph 17.11 for this part of the Work. B. No use or occupancy or separate operation of part of the Work may occur prior to compliance with the requirements of Article 6. 17.13 Final Inspection A. OPT is to make a final inspection upon notice from Contractor that the entire Work or portion to be accepted is complete. OAR is to notify Contractor of Work determined to be incomplete or Defective. Immediately take corrective measures to complete the Work and correct Defective Work. 17.14 Final Application for Payment A. Include adjustments to the Contract Price in the final Application for Payment for: 1. Approved Change Orders and Contract Amendments, 2. Allowances not previously adjusted by Change Order, 3. Deductions for Defective Work that has been accepted by the Owner, 4. Penalties and bonuses, 5. Deductions for liquidated damages, 6. Deduction for all final set-offs, and 7. Other adjustments if needed. B. OAR will prepare a final Change Order reflecting the approved adjustments to the Contract Price which have not been covered by previously approved Change Orders and if necessary reconcile estimate unit price quantities with actual quantities. General Conditions 00 72 00-77 Corpus Christi Standards Rev 6/2021 17.15 Final Payment A. Make final Application for Payment after completing required corrections identified during the final inspection and delivering items and documents required by the Contract Documents. Provide the following with the final Application for Payment: 1. Consent of Surety to Final Payment acknowledging unsettled disputes; and 2. Certification of Payment of Debts and Claims or Certification of Release of Liens or furnish receipts or releases in full from Subcontractors and Suppliers. B. OAR is to either recommend payment of the final Application for Payment to Owner if OPT is satisfied that the Work has been completed and Contractor's other obligations under the Contract Documents have been fulfilled or notify the Contractor of the OPT's reasons for not recommending final payment. C. The Work is complete, subject to surviving obligations, when it is ready for final payment as established by the OAR's recommendation of payment of the final Application for Payment to Owner and the issuance of a Certificate of Final Completion. D. The Owner is to pay the amount of final payment recommended by the OAR within 30 days after receipt of the final Application for Payment and accompanying documentation from the OAR. 17.16 Waiver of Claims A. The making of final payment does not constitute a waiver by Owner of claims or rights against Contractor. Owner expressly reserves claims and rights arising from: 1. Unsettled Liens or claims for non-payment; 2. Defective Work appearing after final inspection; 3. Contractor's failure to comply with the Contract Documents or the terms of specified special guarantees; or 4. Contractor's continuing obligations under the Contract Documents. B. Contractor waives claims and rights against Owner by accepting final payment with the exception of those Claims made in accordance with the provisions of Article 22 and specifically noted in the Certificate of Final Completion. 17.17 Correction Period A. Promptly correct Defective Work without cost to Owner for 1 year after the date of Substantial Completion or, in the event of a latent defect, within 1 year after discovery thereof by City. B. Promptly correct damages to the Site or adjacent areas that Contractor has arranged to use through construction easements or other agreements. Promptly correct damages to Work or the work of others. Make corrections without cost to Owner. C. Owner may have the Defective Work and damages described in Paragraphs 17.17.A and 17.17.13 corrected if Contractor does not comply with the terms of OAR's instructions, or in an emergency where delay would cause serious risk of loss or damage. General Conditions 00 72 00-78 Corpus Christi Standards Rev 6/2021 D. Contractor's obligation to indemnify Owner for claims arising out of or related to the correction of Defective Work are as set forth in Paragraph 7.14. E. The correction period starts to run from the date when a specific item of equipment or system is placed in continuous beneficial use by Owner before Substantial Completion of Work if so provided in the Specifications or if accepted for beneficial use by the Owner. F. Contractor's obligations under this Paragraph 17.17 are in addition to other obligations or warranties. The provisions of this Paragraph 17.17 are not a substitute for, or a waiver of, the provisions of applicable statutes of limitation or repose. ARTICLE 18—SUSPENSION OF WORK AND TERMINATION 18.01 Owner May Suspend Work A. Owner may suspend the Work or a portion of the Work for a period of not more than 90 consecutive days, at any time and without cause, by notice to Contractor. This notice fixes the date on which Contractor is to resume Work. Contractor is entitled to adjustments in the Contract Price and Contract Times directly attributable to this suspension only if efforts are made to mitigate the cost impacts of the suspension. Meet with the Owner within 10 days of the notice of suspension to discuss specific strategies to reduce or eliminate the cost of delays. Submit a Change Proposal seeking an adjustment no later than 30 days after the date fixed for resumption of Work. 18.02 Owner May Terminate for Cause A. The occurrence of one or more of the following events constitutes a default by Contractor and justifies termination for cause: 1. Contractor's persistent failure to perform the Work in accordance with the Contract Documents, including failure to supply sufficient skilled workers or suitable materials or equipment; 2. Failure to adhere to the Progress Schedule; 3. Failure of the Contractor to provide a satisfactory replacement Bond or insurance in the event either is lost or canceled; 4. Failure of Contractor to maintain financial solvency to adequately complete the Project as indicated by one or more of the following: a. A petition of bankruptcy is filed by or against Contractor, b. Contractor is adjudged as bankrupt or insolvent, c. Contractor or surety makes a general assignment for the benefit of creditors, d. A receiver is appointed for the benefit of Contractor's creditors, or e. A receiver is appointed on account of Contractor's insolvency; 5. Contractor's disregard of Laws or Regulations of public bodies having jurisdiction; 6. Contractor's repeated disregard of the authority of OPT; 7. Contractor's failure to prosecute the work with diligence; or General Conditions 00 72 00-79 Corpus Christi Standards Rev 6/2021 8. Contractor's other material breach of the contract. B. Contractor and surety must provide adequate assurance of future performance in accordance with the Contract Documents that is satisfactory to Owner if Contractor is believed to be in financial distress due to the existence of one or more of the indicators listed in Paragraph 18.02.A.4. Owner may terminate Contractor's performance under this Contract if Contractor and surety fail to provide adequate documentation satisfactory to Owner within 10 days of OAR's request for this information. C. Owner may declare Contractor to be in default, give notice to Contractor and surety that Contractor's performance under the Contract is terminated, and enforce the rights available to Owner under the Performance Bond after giving Contractor and surety 10 days' notice that one or more of the events identified in Paragraph 18.02.A has occurred. D. Owner may exclude Contractor from the Site, take possession of the Work, incorporate the materials and equipment stored and complete the Work as Owner may deem expedient if Owner has terminated Contractor's performance under the Contract for cause. E. Owner may elect not to proceed with termination of Contractor's performance under the Contract under this Paragraph 18.02 if Contractor begins to cure the cause for termination within 7 days of receipt of notice of intent to terminate. F. Contractor is not entitled to receive further payments until the Work is completed if Owner proceeds as provided in this Paragraph 18.02. The amount of the Contract Price remaining is to be paid to the Contractor if the unpaid balance exceeds the cost to complete the Work. The cost to complete the Work may include related claims, costs, losses, damages, and the fees and charges of engineers, architects, attorneys, and other professionals retained by Owner. Pay the difference to Owner if the cost to complete the Work including related claims, costs, losses, and damages exceeds the unpaid balance of the Contract Price. Owner is not required to obtain the lowest price for the Work performed when exercising its rights or remedies under this paragraph. G. Termination of Contractor's performance does not affect the rights or remedies of Owner against Contractor or against surety under the Payment Bond or Performance Bond. Owner does not release Contractor from liability by paying or retaining money due Contractor. H. In the event the Owner terminates the contract for cause, and it is later determined that cause for termination was lacking, the termination will be deemed a termination without cause under Paragraph 18.03. 18.03 Owner May Terminate For Convenience A. Owner may terminate the Contract without cause after giving 7 days' notice to Contractor of the effective date of termination. Contractor is to be paid for the following if Owner terminates for convenience: 1. Work completed in accordance with the Contract Documents prior to the effective date of termination; 2. Actual costs sustained prior to the effective date of termination for Work in progress, plus a fee calculated in accordance with Paragraph 15.05; and 3. Reasonable expenses directly attributable to termination, including costs incurred to prepare a termination for convenience cost proposal. General Conditions 00 72 00-80 Corpus Christi Standards Rev 6/2021 B. No payment is payable to Contractor for loss of anticipated overhead, profits or revenue, or other economic loss arising out of or resulting from this termination. ARTICLE 19— PROJECT MANAGEMENT 19.01 Work Included A. Furnish resources required to complete the Project with an acceptable standard of quality within the Contract Times. B. Construct Project in accordance with current safety practices. C. Manage Site to allow access to Site and control construction operations. D. Construct temporary facilities to provide and maintain control over environmental conditions at the Site. Remove temporary facilities when no longer needed. E. Provide temporary controls for pollutions, management of water and management of excess earth. 19.02 Quality Assurance A. Employ competent workmen,skilled in the occupation for which they are employed. Provide Work meeting quality requirements of the Contract Documents. B. Remove Defective Work from the Site immediately unless provisions have been made and approved by the OPT to allow repair of the product at the Site. Clearly mark Work as Defective until it is removed or allowable repairs have been completed. 19.03 Document Submittal A. Provide documents in accordance with Article 24. 1. Provide copies of Supplier's printed storage instructions prior to furnishing materials or products and installation instructions prior to beginning the installation. 2. Incorporate field notes,sketches, recordings,and computations made by the Contractor in Record Data. 19.04 Required Permits A. Obtain building permits for the Project from the local authorities having jurisdiction. Pay building permit fees and include this cost in the Contract Price. B. Obtain environmental permits required for construction at the Site. C. Provide required permits for transporting heavy or oversized loads. D. Provide other permits required to conduct any part of the Work. E. Arrange for inspections and certification by agencies having jurisdiction over the Work. F. Make arrangements with private utility companies and pay for fees associated with obtaining services, or for inspection fees. G. Retain copies of permits and licenses at the Site and observe and comply with all regulations and conditions of the permit or license. General Conditions 00 72 00-81 Corpus Christi Standards Rev 6/2021 19.05 Safety Requirements A. Manage safety to protect the safety and welfare of persons at the Site. B. Provide safe access to move through the Site. Provide protective devices to warn and protect from hazards at the Site. C. Provide safe access for those performing tests and inspections. D. Comply with latest provisions of the Occupational Health and Safety Administration and other Laws and Regulation. E. Cooperate with accident investigations. Provide two copies of all reports,including insurance company reports, prepared concerning accidents, injury, or death related to the Project to the OAR as Record Data per Article 26. 19.06 Access to the Site A. Maintain access to the facilities at all times. Do not obstruct roads, pedestrian walks, or access to the various buildings, structures, stairways, or entrances. Provide safe access for normal operations during construction. B. Provide adequate and safe access for inspections. Leave ladders, bridges, scaffolding, and protective equipment in place until inspections have been completed. Construct additional safe access if required for inspections. C. Use roadways for construction traffic only with written approval of the appropriate representatives of each entity. Obtain written approval to use roads to deliver heavy or oversized loads to the Site. Furnish copies of the written approvals to the Owner as Record Data per Article 26. 19.07 Contractor's Use of Site A. Limit the use of Site for Work and storage to those areas designated on the Drawings or approved by the OAR. Coordinate the use of the premises with the OAR. B. Provide security at the Site as necessary to protect against vandalism and loss by theft. C. Do not permit alcoholic beverages or illegal substances on the Site. Do not allow persons under the influence of alcoholic beverages or illegal substances to enter or remain on the Site at any time. Persons on Site under the influence of alcoholic beverages or illegal substances will be permanently prohibited from returning to the Site. Criminal or civil penalties may also apply. D. Park construction equipment in designated areas only and provide spill control measures. E. Park employees'vehicles in designated areas only. F. Obtain written permission of the Owner before entering privately-owned land outside of the Owner's property, rights-of-way, or easements. G. Do not allow the use of audio devices, obnoxious, vulgar or abusive language, or sexual harassment in any form. These actions will cause immediate and permanent removal of the offender from the premises. Criminal or civil penalties may apply. General Conditions 00 72 00-82 Corpus Christi Standards Rev 6/2021 H. Require Workers to wear clothing that is inoffensive and meets safety requirements. Do not allow sleeveless shirts, shorts, exceedingly torn, ripped, or soiled clothing to be worn on the Project. I. Do not allow firearms or weapons of any sort to be brought on to the Site under any conditions. No exception is to be made for persons with concealed handgun permits. Remove any firearms or weapons and the person possessing these firearms or weapons immediately from the Site. 19.08 Protection of Existing Structures and Utilities A. Examine the Site and review the available information concerning the Site. Locate utilities, streets, driveways, fences, drainage structures, sidewalks, curbs, and gutters. Verify the elevations of the structures adjacent to excavations. Report any discrepancies from information in the Contract Documents to the OAR before beginning construction. B. Determine if existing structures, poles, piping, or other utilities at excavations will require relocation or replacement. Prepare a Plan of Action and coordinate Work with local utility companies and others for the relocation or replacement. C. Protect buildings, utilities, street surfaces, driveways, sidewalks, curb and gutter, fences, wells, drainage structures, piping, valves, manholes, electrical conduits, and other systems or structures unless they are shown to be replaced or relocated on the Drawings. Restore damaged items to the satisfaction of the OPT and utility owner. D. Carefully support and protect all structures and/or utilities so that there will be no failure or settlement where excavation or demolition endangers adjacent structures and utilities. Do not take existing utilities out of service unless required by the Contract Documents or approved by the OAR. Notify and cooperate with the utility owner if it is necessary to move services, poles, guy wires, pipelines, or other obstructions. E. Protect existing trees and landscaping at the Site. 1. Identify trees that may be removed during construction with OPT. 2. Mark trees to be removed with paint. 3. Protect trees to remain from damage by wrapping trunks with 2 x 4 timbers around the perimeter, securely wired in place, where machinery must operate around existing trees. Protect branches and limbs from damage by equipment. 4. Protect root zone from compaction. 19.09 Pre-Construction Exploratory Excavations A. Excavate and expose existing pipelines that cross within 20 feet of Project pipelines prior to any Work. Survey the line to determine its exact vertical and horizontal location at each point the existing pipeline may potentially conflict with the Work. B. Excavate and expose existing parallel pipelines at 300 feet intervals (maximum) for existing pipelines which are within 10 feet of Project pipelines. Survey the line to determine its exact vertical and horizontal location at each point where the line is excavated and exposed. General Conditions 00 72 00-83 Corpus Christi Standards Rev 6/2021 C. Prepare a Plan of Action indicating the owner of pipelines excavated and surveyed and all pertinent survey data, including the station where lines cross or conflicts may exist and the distance to the pavement centerline and elevations of the top of existing pipelines. D. Do not perform Work on the Project until all exploratory excavations have been completed and the Plan of Action has been approved by the OAR. E. Unless specifically indicated otherwise in the Bid Form, no separate payment will be made for pre-construction exploratory excavations. Include the cost for pre-construction exploratory excavations in the unit price for the pipe construction or other applicable feature. When necessary, pavement repairs associated with exploratory excavations that are beyond the limits of the new pavement will be paid for at the unit prices for pavement repair when an item is included in the Bid Form. When an item for pavement repair is not included in the Bid Form, the cost should be included in the unit price for the pipe construction or other applicable feature. 19.10 Disruption of Services/Continued Operations A. Existing facilities are to continue in service as usual during the construction unless noted otherwise. Owner of utilities must be able to operate and maintain the facilities. Keep disruptions to existing utilities, piping, process piping, or electrical services to a minimum. 1. Do not restrict access to critical valves or operators. 2. Limit operations to the minimum amount of space needed to complete the specified Work. 3. Maintain storm sewers and sanitary sewers in service at all times. Provide temporary service around the construction or otherwise construct the structure in a manner that the flow is not restricted. B. Provide a Plan of Action if facilities must be taken out of operation. 19.11 Field Measurements A. Perform complete field measurements prior to purchasing products or beginning construction for products required to fit existing conditions. B. Verify property lines, control lines, grades, and levels indicated on the Drawings. C. Check Shop Drawings and indicate the actual dimensions available where products are to be installed. D. Include field measurements in Record Data as required in Article 26. 19.12 Reference Data and Control Points A. The OPT will provide the following control points: 1. Base line or grid reference points for horizontal control. 2. Benchmarks for vertical control. B. Locate and protect control points prior to starting the Work and preserve permanent reference points during construction. Designated control points may be on an existing structure or monument. Do not change or relocate points without prior approval of the OAR. General Conditions 00 72 00-84 Corpus Christi Standards Rev 6/2021 Notify OAR when the reference point is lost, destroyed, or requires relocation. Replace Project control points on the basis of the original survey. C. Provide complete engineering layout of the Work needed for construction. 1. Provide competent personnel. Provide equipment including accurate surveying instruments, stakes, platforms,tools, and materials. 2. Provide surveying with accuracy meeting the requirements established for Category 5 Construction Surveying as established in the Manual of Practice of Land Surveying in Texas published by the Texas Society of Professional Surveyors, latest revision. 3. Record Data and measurements per standards. 19.13 Delivery and Storage A. Deliver products and materials to the Site in time to prevent delays in construction. B. Deliver packaged products to Site in original undamaged containers with identifying labels attached. Open cartons as necessary to check for damage and to verify invoices. Reseal cartons and store properly until used. Leave products in packages or other containers until installed. C. Assume full responsibility for the protection and safekeeping of products stored at the Site. D. Store products at locations acceptable to the OAR and to allow Owner access to maintain and operate existing facilities. E. Store products in accordance with the Supplier's storage instructions immediately upon delivery. Leave seals and labels intact. F. Provide additional storage areas as needed for construction. Store products subject to damage by elements in substantial weather-tight enclosures or storage sheds. Provide and maintain storage sheds as required for the protection of products. Provide temperature, humidity control, and ventilation within the ranges stated in the Supplier's instructions. Remove storage facilities at the completion of the Project. G. Protect the pipe interior. Keep all foreign materials such as dirt, debris, animals, or other objects out of the pipe during the Work. Cap or plug ends of installed pipe in an approved manner when pipe is not being installed. Clean or wash out pipe sections that become contaminated before continuing with installation. Take precautions to prevent the pipe from floating or moving out of the proper position during or after laying operations. Immediately correct any pipe that moves from its correct position. H. Provide adequate exterior storage for products that may be stored out-of-doors. 1. Provide substantial platforms, blocking, or skids to support materials and products above ground which has been sloped to provide drainage. Protect products from soiling or staining. 2. Cover products subject to discoloration or deterioration from exposure to the elements, with impervious sheet materials. Provide ventilation to prevent condensation below covering. 3. Store loose, granular materials on clean, solid surfaces, or on rigid sheet materials, to prevent mixing with foreign matter. General Conditions 00 72 00-85 Corpus Christi Standards Rev 6/2021 4. Provide surface drainage to prevent erosion and ponding of water. 5. Prevent mixing of refuse or chemically injurious materials or liquids with stored materials. 6. Pipes and conduits stored outdoors are to have open ends sealed to prevent the entrance of dirt, moisture, and other injurious materials. Protect PVC pipe from ultraviolet light exposure. 7. Store light weight products to prevent wind damage. I. Maintain storage facilities. Inspect stored products on a weekly basis and after periods of severe weather to verify that: 1. Storage facilities continue to meet specified requirements; 2. Supplier's required environmental conditions are continually maintained; and 3. Products that can be damaged by exposure to the elements are not adversely affected. J. Replace any stored item damaged by inadequate protection or environmental controls. K. Payment may be withheld for any products not properly stored. 19.14 Cleaning During Construction A. Provide positive methods to minimize raising dust from construction operations and provide positive means to prevent air-borne dust from disbursing into the atmosphere. Control dust and dirt from demolition, cutting, and patching operations. B. Clean the Project as Work progresses and dispose of waste materials, keeping the Site free from accumulations of waste or rubbish. Provide containers on Site for waste collection. Do not allow waste materials or debris to blow around or off of the Site. Control dust from waste materials. Transport waste materials with as few handlings as possible. C. Comply with Laws and Regulations. Do not burn or bury waste materials. Remove waste materials, rubbish and debris from the Site and legally dispose of these at public or private disposal facilities. D. Provide a final cleaning to thoroughly clean the entire Site and make ready for acceptance. 1. Remove construction debris, boxes, and trash from the Site. 2. Remove construction storage sheds and field offices. 3. Restore grade to match surrounding condition and remove excess dirt. 4. Sweep all drives and parking lots clean of dirt and debris. Use water trucks or hose down paved site to like new appearance. 19.15 Maintenance of Roads, Driveways, and Access A. Maintain roads and streets in a manner that is suitable for safe operations of public vehicles during all phases of construction unless the Owner approves a street closing. Do not close public roads overnight. B. Submit a Notification by Contractor for Owner's approval of a street closing. The request shall state: General Conditions 00 72 00-86 Corpus Christi Standards Rev 6/2021 1. The reason for closing the street. 2. How long the street will remain closed. 3. Procedures to be taken to maintain the flow of traffic. C. Construct temporary detours, including by-pass roads around construction,with adequately clear width to maintain the free flow of traffic at all times. Maintain barricades, signs, and safety features around the detour and excavations. Maintain barricades, signs, and safety features around the Work in accordance with all provisions of the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD). D. Assume responsibility for any damage resulting from construction along roads or drives. 19.16 Area Access and Traffic Control A. Provide traffic control measures to assure a safe condition and to provide a minimum of inconvenience to motorists and the public. Provide all-weather access to all residents and businesses at all times during construction. Provide temporary driveways and/or roads of approved material during wet weather. Maintain a stockpile of suitable material on the Site to meet the demands of inclement weather. B. Schedule operations to minimize adverse impact on the accessibility of adjoining properties. Sequence construction to build driveways in half widths, construct temporary ramps, or any other measure required to maintain access to adjoining properties. C. Comply with the Owner's Uniform Barricading Standards and Practices. Copies of this document are available through the Owner's Traffic Engineering Department. Secure required permits from the Owner's Traffic Engineering Department. 19.17 Overhead Electrical Wires A. Comply with OSHA safety requirements regarding construction equipment working beneath overhead electrical wires. Prevent and pay for repairs for damage to existing overhead electrical wires or facilities. B. Provide for adequate safety with regard to overhead lines whether overhead lines are or are not shown in the Contract Documents. 19.18 Blasting A. Blasting is not allowed for any purpose. 19.19 Archeological Requirements A. Cease operations immediately and contact the Owner for instructions if historical or archaeological artifacts are found during construction. B. Conduct all construction activities to avoid adverse impact on the Sites where significant historical or archaeological artifacts are found or identified as an area where other artifacts could be found. 1. Obtain details for Working in these areas. 2. Maintain confidentiality regarding the Site. General Conditions 00 72 00-87 Corpus Christi Standards Rev 6/2021 3. Adhere to the requirements of the Texas Historical Commission. 4. Notify the OAR and the Texas Historical Commission. C. Do not disturb archaeological sites. 1. Obtain the services of a qualified archaeological specialist to instruct construction personnel on how to identify and protect archaeological finds on an emergency basis. 2. Coordinate activities to permit archaeological work to take place within the area. a. Attempt to archaeologically clear areas needed for construction as soon as possible. b. Provide a determination of priority for such areas. D. Assume responsibility for any unauthorized destruction that might result to such Sites by construction personnel, and pay all penalties assessed by the State or Federal agencies for non-compliance with these requirements. E. Contract Times will be modified to compensate for delays caused by such archaeological finds. No additional compensation will be paid for delays. 19.20 Endangered Species Resources A. Do not perform any activity that is likely to jeopardize the continued existence of a threatened or endangered species as listed or proposed for listing under the Federal Endangered Species Act (ESA), and/or the State of Texas Parks and Wildlife Code on Endangered Species, or to destroy or adversely modify the habitat of such species. B. Cease Work immediately in the area of the encounter and notify the OAR if a threatened or endangered species is encountered during construction. OPT will implement actions in accordance with the ESA and applicable State statutes. Resume construction in the area of the encounter when authorized to do so by the OAR. 19.21 Cooperation with Public Agencies A. Cooperate with all public and private agencies with facilities operating within the limits of the Project. B. Provide a 48-hour notice to any applicable agency when work is anticipated to proceed in the vicinity of any facility by using Texas 811 at 811 and the Lone Star Notification Company at 1-800-669-8344. ARTICLE 20—PROJECT COORDINATION 20.01 Work Included A. Administer Contract requirements to construct the Project. Provide documentation per the requirements of this Section. Provide information as requested by the OPT. 20.02 Document Submittal A. Provide documents in accordance with Article 24. General Conditions 00 72 00-88 Corpus Christi Standards Rev 6/2021 B. Use the forms provided for Contract administration, applications for payment, document submittals, documentation of test results, equipment installation and documentation, and Project closeout. A digital copy of the required forms will be provided to the Contractor before or at the pre-construction conference. 20.03 Communication During Project A. The OAR is to be the first point of contact for all parties on matters concerning this Project. B. The OAR will coordinate correspondence concerning: 1. Documents, including Applications for Payment. 2. Clarification and interpretation of the Contract Documents. 3. Contract Modifications. 4. Observation of Work and testing. 5. Claims. C. The OAR will normally communicate only with the Contractor. Any required communication with Subcontractors or Suppliers will only be with the direct involvement of the Contractor. D. Direct written communications to the OAR at the address indicated at the pre-construction conference. Include the following with communications as a minimum: 1. Name of the Owner. 2. Project name. 3. Contract title. 4. Project number. 5. Date. 6. A reference statement. 20.04 Project Meetings A. Pre-Construction Conference: 1. Attend a pre-construction conference. 2. The location of the conference will be determined by the OAR. 3. The time of the meeting will be determined by the OAR but will be after the Notice of Award is issued and not later than 15 days after the Notice to Proceed is issued. 4. The OPT, Contractor's project manager and superintendent, representatives of utility companies, and representatives from major Subcontractors and Suppliers may attend the conference. 5. Provide and be prepared to discuss: a. Preliminary construction schedule per Article 27. b. Schedule of Values and anticipated Schedule of Payments per Article 17. C. List of Subcontractors and Suppliers. General Conditions 00 72 00-89 Corpus Christi Standards Rev 6/2021 d. Contractor's organizational chart as it relates to this Project. e. Letter indicating the agents of authority for the Contractor and the limit of that authority with respect to the execution of legal documents,Contract Modifications, and payment requests. B. Progress Meetings: 1. Attend meetings with the OAR and Owner. a. Meet on a monthly basis or as requested by the OAR to discuss the Project. b. Meet at the Site or other location as designated by the OAR. c. Contractor's superintendent and other key personnel are to attend the meeting. Other individuals may be requested to attend to discuss specific matters. d. Notify the OAR of any specific items to be discussed a minimum of 1 week prior to the meeting. 2. Provide information as requested by the OAR or Owner concerning this Project. Prepare to discuss: a. Status of overall Project schedule. b. Contractor's detailed schedule for the next month. c. Anticipated delivery dates for equipment. d. Coordination with the Owner. e. Status of documents. f. Information or clarification of the Contract Documents. g. Claims and proposed Modifications to the Contract. h. Field observations, problems, or conflicts. i. Maintenance of quality standards. 3. OAR will prepare minutes of meetings. Review the minutes of the meeting and notify the OAR of any discrepancies within 10 days of the date of the meeting memorandum. The minutes will not be corrected after the 10 days have expired. Corrections will be reflected in the minutes of the following meeting or as an attachment to the minutes. C. Pre-Submittal and Pre-Installation Meetings: 1. Conduct pre-submittal and pre-installation meetings as required in the individual technical Specifications or as determined necessary by the OAR (for example, instrumentation, roofing, concrete mix design, etc.). 2. Set the time and location of the meetings when ready to proceed with the associated Work. Submit a Notification by Contractor in accordance with Paragraph 20.07 for the meeting 2 weeks before the meeting. OPT must approve of the proposed time and location. 3. Attend the meeting and require the participation of appropriate Subcontractors and Suppliers in the meeting. General Conditions 00 72 00-90 Corpus Christi Standards Rev 6/2021 4. Prepare minutes of the meeting and submit to the OPT for review. OPT will review the minutes of the meeting and notify the Contractor of any discrepancies within 10 days of the date of the meeting memorandum. The minutes will not be corrected after the 10 days have expired. Corrections will be reflected in a revised set of meeting minutes. 20.05 Requests for Information A. Submit Request for Information (RFI) to the OAR to obtain additional information or clarification of the Contract Documents. 1. Submit a separate RFI for each item on the form provided. 2. Attach adequate information to permit a written response without further clarification. OAR will return requests that do not have adequate information to the Contractor for additional information. Contractor is responsible for all delays resulting from multiple document submittals due to inadequate information. 3. A response will be made when adequate information is provided. Response will be made on the RFI form or in attached information. B. Response to an RFI is given to provide additional information, interpretation, or clarification of the requirements of the Contract Documents, and does not modify the Contract Documents. C. Designer will initiate a Request for a Change Proposal (RCP) per Article 12 if the RFI indicates that a Contract Modification is required. D. Use the Project Issues Log to document decisions made at meetings and actions to be taken in accordance with Paragraph 20.06. E. Use the Action Item Log to document assignments for actions to be taken in accordance with Paragraph 20.06. 20.06 Decision and Action Item Log A. OAR will maintain a Project Decision Log to document key decisions made at meetings, telephone conversation or Site visits using the format provided: 1. Review the log prior to each regular meeting. 2. Report any discrepancies to the OAR for correction or discussion at the next monthly meeting. B. OAR will maintain an Action Item log in conjunction with the Project Decision Log to track assignments made at meetings, telephone conversation, or Site visits using the format provided: 1. Review the Action Item Log prior to each regular meeting. 2. Report actions taken subsequent to the previous progress meeting on items in the log assigned to the Contractor or through the Contractor to a Subcontractor or Supplier to the OAR. Report on status of progress 1 week prior to each progress meeting established in Paragraph 20.04 to allow OAR to update the log prior to the Progress meetings. 3. Be prepared to discuss the status at each meeting. General Conditions 00 72 00-91 Corpus Christi Standards Rev 6/2021 C. Decisions or action items in the log that require a change in the Contract Documents will have the preparation of a Modification as an action item if appropriate. The Contract Documents can only be changed by a Modification. 20.07 Notification By Contractor A. Notify the OAR of: 1. Need for testing. 2. Intent to work outside regular working hours. 3. Request to shut down facilities or utilities. 4. Proposed utility connections. 5. Required observation by OAR, Designer, or inspection agencies prior to covering Work. 6. Training. B. Provide notification a minimum of 2 weeks in advance in order to allow OPT time to respond appropriately to the notification. C. Use "Notification by Contractor" form provided. 20.08 Record Documents A. Maintain at the Site one complete set of printed Record Documents including: 1. Drawings. 2. Specifications. 3. Addenda. 4. Modifications. 5. Record Data and approved Shop Drawings. 6. Construction photographs. 7. Test Reports. 8. Clarifications and other information provided in Request for Information responses. 9. Reference standards. B. Store printed Record Documents and Samples in the Contractor's field office. 1. Record Documents are to remain separate from documents used for construction. 2. Provide files and racks for the storage of Record Documents. 3. Provide a secure storage space for the storage of Samples. 4. Maintain Record Documents in clean, dry, legible conditions, and in good order. 5. Make Record Documents and Samples available at all times for inspection by the OPT. C. Maintain a digital record of Specifications and Addenda to identify products provided in PDF format. General Conditions 00 72 00-92 Corpus Christi Standards Rev 6/2021 1. Reference the Record Data number, Shop Drawings number,and O&M manual number for each product and item of equipment furnished or installed. 2. Reference Modifications by type and number for all changes. D. Maintain a digital record of Drawings in PDF format. 1. Reference the Record Data number, Shop Drawings number,and O&M manual number for each product and item of equipment furnished or installed. 2. Reference Modifications by type and number for all changes. 3. Record information as construction is being performed. Do not conceal any Work until the required information is recorded. 4. Mark Drawings to record actual construction, including the following: a. Depths of various elements of the foundation in relation to finished first floor datum or the top of walls. b. Horizontal and vertical locations of underground utilities and appurtenances constructed and existing utilities encountered during construction. C. Location of utilities and appurtenances concealed in the Work. Refer measurements to permanent structures on the surface. Include the following equipment: 1) Piping. 2) Ductwork. 3) Equipment and control devices requiring periodic maintenance or repair. 4) Valves, unions,traps, and tanks. 5) Services entrance. 6) Feeders. 7) Outlets. d. Changes of dimension and detail. e. Changes by Modifications. f. Information in Request for Information or included in the Project Issues Log. g. Details not on the original Drawings. Include field verified dimensions and clarifications, interpretations, and additional information issued in response to RFIs. 5. Mark Drawings with the following colors: a. Highlight references to other documents, including Modifications in blue; b. Highlight mark ups for new or revised Work(lines added) in yellow; C. Highlight items deleted or not installed (lines to be removed) in red; and d. Highlight items constructed per the Contract Documents in green. General Conditions 00 72 00-93 Corpus Christi Standards Rev 6/2021 6. Submit Record Documents to Designer for review and acceptance 30 days prior to Final Completion of the Project. E. Applications for Payment will not be recommended for payment if Record Documents are found to be incomplete or not in order. Final payment will not be recommended without complete Record Documents. ARTICLE 21—QUALITY MANAGEMENT 21.01 Contractor's Responsibilities A. Review the OPT's Quality Management Program and prepare and submit the Contractor's Quality Control Plan. B. Implement the Contractor's Quality Control Plan to control the quality of the Work and verify that the Work meets the standards of quality established in the Contract Documents. 1. Inspect products to be incorporated into the Project. Ensure that Suppliers have adequate quality control systems to ensure that products that comply with the Contract Documents are provided. 2. Integrate quality control measures into construction activities to produce Work which meets quality expectations of the Contract Documents. Inspect the Work of the Contractor, Subcontractors, and Suppliers. Correct Defective Work. 3. Provide and pay for the services of an approved professional materials testing laboratory acceptable to the OPT to provide testing that demonstrates that products proposed in Shop Drawings and Record Data for the Project fully comply with the Contract Documents. 4. Provide facilities, equipment, and Samples required for quality control inspections and tests: a. Give the OAR adequate notice before proceeding with Work that would interfere with inspections or testing; b. Notify the OAR and testing laboratories prior to the time that testing is required, providing adequate lead time to allow arrangements for inspections or testing to be made; C. Do not proceed with any Work that would impact the ability to correct defects or Work that would require subsequent removal to correct defects until testing services have been performed and results of tests indicate that the Work is acceptable; d. Cooperate fully with the performance of sampling, inspection, and testing; e. Provide personnel to assist with sampling or to assist in making inspections and field tests; f. Obtain and handle Samples for testing at the Site or at the production source of the product to be tested; g. Provide adequate quantities of representative products to be tested to the laboratory at the designated locations; General Conditions 00 72 00-94 Corpus Christi Standards Rev 6/2021 h. Provide facilities required to store and cure test Samples; i. Provide calibrated scales and measuring devices for the OPT's use in performing inspections and testing; j. Provide adequate lighting to allow OPT observations; and k. Make Contract Documents available to testing agencies when requested. 5. Provide safe access for all inspection and testing activities, including those to be conducted as part of the OPT's Quality Management Program. 6. Document Defective Work through Certified Test Reports and Defective Work Notices. Document that corrective actions have been taken to correct any defects and that corrected Work is in compliance with the Contract Documents. 7. Apply quality control measures to documentation provided for the Project. 8. Implement countermeasures to prevent future Defective Work. C. Perform tests as indicated in this and other Sections of the Specifications. Technical Specifications govern if any testing and inspection requirements of this Section conflict with the testing and inspection requirements of the technical Specifications. D. All verification testing is to be observed by the OAR or designated representative. E. Send test reports to the OAR and the Designer. F. Provide an update on quality control activities at monthly progress meetings. G. Owner will withhold payment for Defective Work, or Work that has not been tested or inspected in accordance with the Contractor's Quality Control Plan,the OPT's Quality Control Program, or the Contract Documents. H. Owner will withhold payment for additional testing fees incurred due to Contractor noncompliance with OPT's Quality Control Program, including retesting fees, standby time, cancellation charges, and trip fees for retesting or cancellations. I. Work performed that is connected or adjacent to Defective Work or Work that would have to be removed to correct Defective Work is also considered to be Defective. Contractor is responsible for all cost with replacing any acceptable Work that must be removed or might be damaged by corrective actions. 21.02 Quality Management Activities by OPT A. OPT will perform its own quality assurance tests independent of the Contractor's Quality Control Program. Assist the OPT and testing organizations in performing quality assurance activities per Paragraph 21.01. B. Quality assurance testing performed by the OPT will be paid for by the Owner, except for verification testing required per Paragraph 21.07. C. Quality assurance activities of the OPT, through their own forces or through contracts with consultants and materials testing laboratories are for the purpose of monitoring the results of the Contractor's Work to see that it is in compliance with the requirements of the Contract Documents. Quality assurance activities or non-performance of quality assurance activities by the OPT do not: General Conditions 00 72 00-95 Corpus Christi Standards Rev 6/2021 1. Relieve the Contractor of its responsibility to provide Work or furnish products that conform with the requirements of the Contract Documents; 2. Relieve the Contractor of its responsibility for providing adequate quality control measures; 3. Relieve the Contractor of its responsibility for damage to or loss of Work or products before OPT's acceptance; 4. Constitute or imply OPT's acceptance; and 5. Affect the continuing rights of the Owner after OPT's acceptance of the completed Work. D. Work is subject to OPT's quality assurance observations or testing at any time. Products which have been tested or inspected and approved by OPT at a supply source or staging area may be inspected or tested again by the OPT before, during or after incorporation into the Work and rejected if products do not comply with the Contract Documents. 21.03 Contractor's Use of OPT's Test Reports A. OPT has prepared a Quality Management Plan that describes, in general, the OPT's anticipated quality assurance testing program for this Project. This testing program will be made available to Bidders during the bidding phase. This plan outlines only the testing in general terms and may not reflect actual testing. Actual testing will depend on the Contractors means, methods and procedures of construction which will not be known until the Contractor begins Work and submits their own Quality Control Plan for review. There is no guarantee that all testing will be performed. B. Contractor will receive copies of all test reports documenting OPT's quality assurance activities. Contractor is entitled to rely on the accuracy of these test results and use these as part of their quality control efforts. C. Contractor is to determine additional testing or inspections that may be required to implement the Contractor's Quality Control Plan. Include cost for additional testing and inspections required to meet Contractors quality control obligations, including the cost for correcting Defective Work in the Contract Price. D. Contractor may submit a Change Proposal if OPT's quality assurance testing program deviates significantly from the OPT's Quality Management Plan, and Contractor can demonstrate that additional cost was incurred to implement the Contractor's Quality Control Plan resulting from these deviations. 21.04 Documentation A. Provide documentation which includes: 1. Contractor's Quality Management Plan that establishes the methods of assuring compliance with the Contract Documents. Submit this plan as a Shop Drawings per Article 25. 2. A Statement of Qualification for any proposed testing laboratories that includes a list of the engineers and technical staff that will provide testing services on the Project, descriptions of the qualifications of these individuals, list of tests that can be performed, General Conditions 00 72 00-96 Corpus Christi Standards Rev 6/2021 equipment used with date of last certification, and a list of recent projects for which testing has been performed with references for those projects. 3. Provide Certified Test Reports for products to be incorporated into the Project. Provide reports to indicate that proposed products comply with the Contract Documents or indicate that proposed products do not comply with the Contract Documents and why it does not comply. Submit these test reports as part of a Shop Drawings submitted per Article 25. 4. Provide Certified Test Reports for inspection and testing required in this Section and in other Specification Sections. Provide reports to indicate that Work complies with the Contract Documents or indicate that Work does not comply with the Contract Documents and why it does not comply. Submit these test reports on forms provided per Article 24. 21.05 Standards A. Provide testing laboratories that comply with the American Council of Independent Laboratories (ACIL) "Recommended Requirements for Independent Laboratory Qualifications." B. Perform testing per recognized test procedures as listed in the various Sections of the Specifications, standards of the State Department of Highways and Public Transportation, American Society of Testing Materials (ASTM), or other testing associations. Perform tests in accordance with published procedures for testing issued by these organizations. 21.06 Delivery and Storage A. Handle and protect test specimens of products and construction materials at the Site in accordance with recognized test procedures. Provide facilities for storing, curing, and processing test specimens as required by test standard to maintain the integrity of Samples. 21.07 Verification Testing for Corrected Defects A. Provide verification testing on Work performed to correct Defective Work to demonstrate that the Work is now in compliance with the Contract Documents. Document that Defective Work has been corrected and verify that the OAR closes the item in the Defective Work Register. B. Pay for verification testing. OPT may perform verification testing as part of their Quality Management Program and impose a Set-off to recover the cost for this testing. C. Conduct the same tests or inspections used to determine that the original Work was Defective. Different tests or methods may be used if approved by the OPT. 21.08 Test Reports A. Certified Test Reports are to be prepared for all tests. 1. Tests performed by testing laboratories may be submitted on their standard test report forms if acceptable to the OPT. These reports must include the following: a. Name of the Owner, Project title and number and Contractor; General Conditions 00 72 00-97 Corpus Christi Standards Rev 6/2021 b. Name of the laboratory, address, and telephone number; C. Name and signature of the laboratory personnel performing the test; d. Description of the product being sampled or tested; e. Date and time of sampling, inspection, and testing; f. Date the report was issued; g. Description of the test performed; h. Weather conditions and temperature at time of test or sampling; i. Location at the Site or structure where the sample was taken; j. Standard or test procedure used in making the test; k. A description of the results of the test; I. Statement of compliance or non-compliance with the Contract Documents; and m. Interpretations of test results, if appropriate. 2. Submit reports on tests performed by Contractor, Subcontractors or Suppliers on the forms provided by the OAR. 3. OPT will prepare test reports on test performed by the OPT. B. Send test report to Designer within 24 hours of completing the test. Flag tests reports with results that do not comply with Contract Documents for immediate attention. C. Payment for Work may be withheld until test reports indicate that the Work is not Defective. 21.09 Defective Work A. Immediately correct any Defective Work or notify the OAR why the Work is not to be corrected immediately and when corrective action will be completed. B. No payment will be made for Defective Work. Remove Work from the Application for Payment if Work paid for on a previous Application for Payment is found to be Defective. 21.10 Limitation of Authority of Testing Laboratory A. The testing laboratory representatives are limited to providing testing services and interpreting the results of the test performed. B. The testing laboratory is not authorized to: 1. Alter the requirements of the Contract Documents; 2. Accept or reject any portion of the Work; 3. Perform any of the duties of the Contractor; or 4. Direct or stop the Work. 21.11 Quality Control Plan A. Submit the Contractor's Quality Control Plan for approval as a Shop Drawing per Article 25. Use Contractor's Quality Control Plan Checklist provided to review the document before General Conditions 00 72 00-98 Corpus Christi Standards Rev 6/2021 submitting and include a copy of the completed checklist with the Contractor's Quality Control Plan. Do not begin Work until the Contractor's Quality Control Plan is approved. Submit an interim plan covering only the portion of Work to be performed if the Contractor plans to begin Work prior to submitting the Contractor's Quality Control Plan for the Project. Do not begin Work on other parts of the Project until the Contractor's Quality Control Plan is approved or another interim plan covering the additional Work to be started is approved. B. Provide a Contractor's Quality Control Plan that incorporates construction operations at both the Site and production Work at remote locations and includes Work by Subcontractors and Suppliers. The Contractor's Quality Control Plan is to include: 1. A description of the quality control organization, including an organization chart showing lines of authority to control the quality of Work; 2. Documentation describing name, qualifications (in resume format), duties, responsibilities, and level of authority of the Quality Control Manager; 3. The name, qualifications (in resume format), duties, responsibilities, and authorities of other persons assigned a quality control function; 4. Procedures for scheduling, reviewing, certifying, and managing documentation, including documentation provided by Subcontractors and Suppliers; 5. Control,verification, and acceptance testing procedures for each specific test. Include: a. Name of tests to be performed, b. Specification paragraph requiring test, C. Parameters of Work to be tested, d. Test frequency, e. Persons responsible for each test, and f. Applicable industry testing standards and laboratory facilities to be used for the test; 6. Integrate the OPT quality assurance testing into the Contractor's Quality Control Plan, specifically identifying the tests or inspections in Paragraph 21.11.13.5 that will be provided by the OPT as part of their Quality Management Program; 7. Procedures for tracking and documenting quality management efforts. 8. Procedures for tracking Defective Work from initial identification through acceptable corrective action. Indicate how documentation of the verification process for deficiencies will be made. 9. Reporting procedures which incorporate the use of forms provided by the OAR. 10. The name of the proposed testing laboratories along with documentation of qualifications per Paragraph 21.04. C. The Quality Control Manager must have authority to reject Defective Work and redirect the efforts of the Contractor's Team to prevent or correct Defective Work. D. Notify the Designer of any changes to the Contractor's Quality Control Plan or quality control personnel. General Conditions 00 72 00-99 Corpus Christi Standards Rev 6/2021 E. Meet with the OPT 7 days after Contractor's Quality Control Plan is submitted and before start of construction to discuss the Contractor's Quality Control Plan and expedite its approval. 21.12 Implement Contractor's Quality Control Plan A. Perform quality control observations and testing as required in each Section of the Specifications and where indicated on the Drawings. B. Include the following phases for each definable Work task. A definable Work task is one which is separate and distinct from other tasks, has separate control requirements, may be provided by different trades or disciplines, or may be Work by the same trade in a different environment. 1. Planning Phase: Perform the following before beginning each definable Work task: a. Review the Contract Drawings. b. Review documents and determine that they are complete in accordance with the Contract Documents. c. Check to assure that all materials and/or equipment have been tested, submitted, and approved. d. Examine the work area to assure that all required preliminary Work has been completed and complies with the Contract Documents. e. Examine required materials, equipment, and Sample Work to assure that they are on hand, conform to Shop Drawings and Record Data, and are properly stored. f. Review requirements for quality control inspection and testing. g. Discuss procedures for controlling quality of the Work. Document construction tolerances and workmanship standards for the Work task. h. Check that the portion of the plan for the Work to be performed incorporates document review comments. i. Discuss results of planning phase with the OAR. Conduct a meeting attended by the Quality Control Manager, the OAR, superintendent, other quality control personnel as applicable, and the foreman responsible for the Work task. Instruct applicable workers as to the acceptable level of workmanship required in order to meet the requirements of the Contract Documents. Document the results of the preparatory phase actions by separate meeting minutes prepared by the Quality Control Manager and attached to the quality control report. j. Do not move to the next phase unless results of investigations required for the planning phase indicate that requirements have been met. 2. Work Phase: Complete this phase after the Planning Phase: a. Notify the OAR at least 24 hours in advance of beginning the Work and discuss the review of the planning effort to indicate that requirements have been met. b. Check the Work to ensure that it is in full compliance with the Contract Documents. General Conditions 00 72 00-100 Corpus Christi Standards Rev 6/2021 c. Verify adequacy of controls to ensure full compliance with Contract Documents. Verify required control inspection and testing is performed. d. Verify that established levels of workmanship meet acceptable workmanship standards. Compare with required Sample panels as appropriate. e. Repeat the Work phase for each new crew to work on-site, or any time acceptable specified quality standards are not being met. 3. Follow-up Phase: Perform daily checks to assure control activities, including control testing, are providing continued compliance with contract requirements: a. Make checks daily and record observations in the quality control documentation. b. Conduct follow-up checks and correct all deficiencies prior to the start of additional Work tasks that may be affected by the Defective Work. Do not build upon nor conceal Defective Work. c. Conduct a review of the Work with the OPT one month prior to the expiration of the correction period. Correct defects as noted during the review. C. Conduct additional planning and Work phases if: 1. The quality of on-going Work is unacceptable; 2. Changes are made in applicable quality control staff, on-site production supervision or crews; 3. Work on a task is resumed after a substantial period of inactivity; or 4. Other quality problems develop. ARTICLE 22—FINAL RESOLUTION OF DISPUTES 22.01 Senior Level Negotiations A. Each party is required to continue to perform its obligations under the Contract pending the final resolution of any dispute arising out of or relating to the Contract, unless it would be impossible or impracticable under the circumstances then present. B. All negotiations pursuant to Article 22 are confidential and shall be treated as compromise and settlement negotiations for purposes of applicable rules of evidence. C. Before invoking mediation, Owner and Contractor agree that they first shall try to resolve any dispute arising out of or related to this Contract through discussions directly between those senior management representatives within their respective organizations who have overall managerial responsibility for similar projects. Both Owner and Contractor agree that this step shall be a condition precedent to use of any other alternative dispute resolution process. If the parties' senior management representatives cannot resolve the dispute within 45 calendar days after a party delivers a written notice of such dispute to the other, then the parties shall proceed with mediation. 22.02 Mediation A. In the event that Owner and/or Contractor contend that the other has committed a material breach of the Contract or the parties cannot reach a resolution of a claim or dispute pursuant General Conditions 00 72 00-101 Corpus Christi Standards Rev 6/2021 to Article 13, as a condition precedent to filing a lawsuit,either party shall request mediation of the dispute with the following requirements: 1. The request for mediation shall be in writing and shall request that the mediation commence not less than 30 calendar days or more than 90 calendar days following the date of the request, except upon agreement of the parties. 2. In the event Owner and Contractor are unable to agree to a date for the mediation or to the identity of the mediator within 30 calendar days following the date of the request for mediation, all conditions precedent shall be deemed to have occurred. 3. Owner and Contractor are to each pay one-half of the mediator's fees and costs.Venue for any mediation or lawsuit filed under this Contract shall be in Nueces County,Texas. Any agreement reached in mediation shall be enforceable as a settlement in any court having jurisdiction thereof. 4. Nothing in this Contract shall be construed as consent to a lawsuit. No provision of the Contract shall waive any immunity or defense. ARTICLE 23—MINORITY/MBE/DBE PARTICIPATION POLICY 23.01 Policy A. It is the policy of the City of Corpus Christi that maximum opportunity is afforded minorities, women, low income persons and Minority/Disadvantaged Business Enterprises (M/DBE) to participate in the performance of contracts awarded by the City of Corpus Christi in support of Equal Employment Opportunity goals and objectives. In accordance with such policy,the City has established goals, as stated herein, both for minority and female participation by trade and for Minority Business Enterprise. 23.02 Definitions A. Prime Contractor: Any person, firm, partnership, corporation, association, or joint venture as herein provided which has been awarded a City contract. B. Subcontractor: Any named person, firm, partnership, corporation, association, or joint venture herein identified as providing work, labor, services, supplies, equipment, materials, or any combination of the foregoing under contract with a prime contractor on a City contract. C. Minority/Disadvantaged Business Enterprise: A business enterprise that is owned and controlled by one or more minority person(s) or socially and economically disadvantaged individual(s). Minority/Disadvantaged person(s) must collectively own, operate and/or actively manage, and share in payments from such an enterprise in the manner hereinafter set forth: 1. Owned: a. For a sole proprietorship to be deemed a minority business enterprise, it must be owned by a minority person. b. For an enterprise doing business as a partnership, at least 51 percent of the assets or interest in the partnership property must be owned by one or more minority person(s). General Conditions 00 72 00-102 Corpus Christi Standards Rev 6/2021 C. For an enterprise doing business as a corporation, at least 51 percent of the assets or interest in the corporate shares must be owned by one or more minority person(s). 2. Controlled: a. The primary power, direct or indirect,to manage a business enterprise rests with a minority person(s). 3. Share in Payments: a. Minority partners, proprietors, or stockholders of the business enterprise must be entitled to receive 51 percent or more of the total profits, bonuses, dividends, interest payments, commissions, consulting fees, rents, procurement, and subcontract payments, and any other monetary distribution paid by the business enterprise. D. Minority: Minority persons include Blacks, Mexican-Americans and other persons of Hispanic origin, American Indians, Alaskan Natives, and Asians or Pacific Islanders. For the purposes of this policy,women are also considered as minorities. E. Socially and economically disadvantaged individual:Any individual who is a citizen (or lawfully admitted permanent resident) of the United States and who has been subjected to racial or ethnic prejudice or cultural bias within American society because of his or her identity as a member of a group and without regard to his or her individual qualities.The social disadvantage must stem from circumstances beyond the individual's control. F. Female Owned Business Enterprise: A sole proprietorship that is owned and controlled by a woman,a partnership at least 51 percent of whose assets or partnership interests are owned by one or more women, or a corporation at least 51 percent of whose assets or interests in the corporate shares are owned by one or more women. G. Joint Venture: A joint venture means an association of two or more persons, partnerships, corporations, or any combination thereof, founded to carry on a single business activity which is limited in scope and direction. The degree to which a joint venture may satisfy the stated MBE goal cannot exceed the proportionate interest of the MBE as a member of the joint venture in the Work to be performed by the joint venture. For example,a joint venture which is to perform 50 percent of the Work itself and in which a minority joint venture partner has a 50 percent interest, shall be deemed equivalent to having minority participation in 25 percent of the Work. Minority members of the joint venture must have financial, managerial, or technical skills in the Work to be performed by the joint venture. 23.03 Goals A. The goals for participation by minorities and Minority Business Enterprises expressed in percentage terms for the Contractor's aggregate workforce on all construction Work for the Contract award shall be 1. Minority participation goal is 45%. 2. Minority Business Enterprise participation goal is 15%. B. These goals are applicable to all the construction work (regardless of federal participation) performed in the Contract, including approved Change Orders. The hours of minority General Conditions 00 72 00-103 Corpus Christi Standards Rev 6/2021 employment must be substantially uniform throughout the length of the Contract and in each trade. The transfer of minority employees from Contractor to Contractor or from project to project for the sole purpose of meeting the Contractor's percentage is prohibited. 23.04 Compliance A. Upon completion of the Project, a final breakdown of MBE participation, substantiated by copies of paid invoices, shall be submitted by the Contractor to the City Engineer. B. Make bi-weekly payroll submittals to the City Engineer. The Contractor is to indicate the percent of minority and female participation, by trade, which has been utilized on the Project. Along with the request for final payment on the Project,the Contractor will indicate, in writing, the overall participation in these areas which have been achieved. The City Engineer may withhold monthly or final payments to the Contractor for failure to submit bi- weekly payrolls in a timely fashion or to submit overall participation information as required. ARTICLE 24—DOCUMENT MANAGEMENT 24.01 Work Included A. Submit documentation as required by the Contract Documents and as reasonably requested by the OPT. 24.02 Quality Assurance A. Submit legible, accurate, complete documents presented in a clear, easily understood manner. Documents not meeting these criteria will be returned without review. 24.03 Contractor's Responsibilities A. Review documents prior to submitting. Make certifications as required by the Contract Documents and as indicated on forms provided. B. Provide a Schedule of Documents to list the documents that are to be submitted, the dates on which documents are to be sent to the Designer for review, and proposed dates that documents must be returned to comply with the Project schedule. Use the form provided for this list. C. Incorporate the dates for processing documents into the Progress Schedule required by Article 27. 1. Provide documents in accordance with the schedule so construction of the Project is not delayed. 2. Allow a reasonable time for the review of documents when preparing the Progress Schedule. Assume a 14 day review cycle for each document unless a longer period of time is indicated in the Contract Documents or agreed to by Designer and Contractor. 3. Schedule submittal of documents to provide all information for interrelated Work at one time. 4. Allow adequate time for processing documents so construction of the Project is not delayed. General Conditions 00 72 00-104 Corpus Christi Standards Rev 6/2021 24.04 Document Submittal A. Submit documents through the Designer. Send all documents in digital format for processing. 1. Provide all information requested with a completed Document Transmittal form. Do not leave any blanks incomplete. If information is not applicable, enter NA in the space provided. 2. The Document Transmittal form is to be the first page in the document submitted. 3. Submit all documents in Portable Document Format (PDF). a. Create PDF documents from native format files unless files are only available from scanned documents. b. Rotate pages so that the top of each document appears at the top of the monitor screen when opened in PDF viewing software. c. Submit PDF document with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. d. Submit color PDF documents where color is required to interpret the document. e. Create or convert documents to allow text to be selected for comments or searched using text search features. Run scanned documents through Optical Character Recognition (OCR) software if necessary. f. Flatten markups in documents to prevent markups made by Contractor from being moved or deleted. Flatten documents to allow markup recovery. g. Use software to reduce file size using default settings except the option for "Drop Metadata." Uncheck the "Drop Metadata" box when reducing file size. h. Add footers to each document with the Project name. 24.05 Document Numbering A. Assign a number to the documents originated to allow tracking of the documents during the review process. 1. Assign the number consisting of a prefix, a sequence number, and a letter suffix. Prefixes shall be as follows: Prefix Description Originator AP Application for Payment Contractor CO Change Order OAR CID Change Proposal Contractor CTR Certified Test Report Contractor FO Field Order OAR NBC Notification by Contractor Contractor PD Photographic Documentation Contractor General Conditions 00 72 00-105 Corpus Christi Standards Rev 6/2021 Prefix Description Originator RCP Request for a Change Proposal OAR RD Record Data Contractor RFI Request for Information Contractor SD Shop Drawing Contractor SCH Schedule of Progress Contractor 2. Issue sequence numbers in chronological order for each type of document. 3. Issue numbers for resubmittals that have the same number as the original document followed by an alphabetical suffix indicating the number of times the same document has been sent to the Designer for processing. For example: SD 025 A represents Shop Drawing number 25 and the letter "A" designates that this is the second time this document has been sent for review. 4. Clearly note the document number on each page or sheet of the document. 5. Correct assignment of numbers is essential since different document types are processed in different ways. B. Include reference to the Drawing number and/or Specification Section, detail designation, schedule, or location that corresponds with the data on the document transmittal forms. Other identification may also be required, such as layout drawings or schedules to allow the reviewer to determine where a particular product is to be used. 24.06 Document Requirements A. Furnish documents as indicated below or in individual Specification Sections. Submit documents per the procedures described in the Contract Documents. B. Submit documents per the Specification Section shown in the following table: Document Type Section Application for Payment Article 17 Change Proposal Article 12 Certified Test Report Article 25 for approval of product Article 21 to demonstrate compliance Notification by Contractor Article 20 Photographic Documentation Article 28 Progress Schedules Article 27 Record Data Article 26 Request for Information Article 20 Shop Drawing Article 25 Schedule of Values Article 17 Substitutions Article 12 General Conditions 00 72 00-106 Corpus Christi Standards Rev 6/2021 Document Type Section Suppliers and Subcontractors Articles 20 and 26 ARTICLE 25—SHOP DRAWINGS 25.01 Work Included A. Shop Drawings are required for those products that cannot adequately be described in the Contract Documents to allow fabrication, erection, or installation of the product without additional detailed information from the Supplier. B. Submit Shop Drawings as required by the Contract Documents and as reasonably requested by the OPT to: 1. Record the products incorporated into the Project for the Owner; 2. Provide detailed information for the products proposed for the Project regarding their fabrication, installation, commissioning, and testing; and 3. Allow the Designer to advise the Owner if products proposed for the Project by the Contractor conform, in general,to the design concepts of the Contract Documents. C. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the review of Shop Drawings, Samples, or mockups. Contract modifications can only be approved by Change Order or Field Order. 25.02 Quality Assurance A. Submit legible, accurate, and complete documents presented in a clear, easily understood manner. Shop Drawings not meeting these criteria will be rejected. B. Demonstrate that the proposed products are in full and complete compliance with the design criteria and requirements of the Contract Documents or will be if deviations requested per Paragraph 25.10 are approved. C. Furnish and install products that fully comply with the information included in the document submittal. 25.03 Contractor's Responsibilities A. Provide Shop Drawings as required by Paragraph 25.03 of the Supplementary Conditions. B. Include Shop Drawings in the Schedule of Documents required by Article 24 to indicate the Shop Drawings to be submitted,the dates on which documents are to be sent to the Designer for review and proposed dates that the product will be incorporated into the Project. C. Incorporate the dates for processing Shop Drawings into the Progress Schedule required by Article 27. 1. Submit Shop Drawings in accordance with the schedule so construction of the Project is not delayed. 2. Allow a reasonable time for the review of Shop Drawings when preparing the Progress Schedule. Include time for making revisions to the Shop Drawings and resubmitting the Shop Drawing for a least a second review. Assume a 14-day review cycle for each time General Conditions 00 72 00-107 Corpus Christi Standards Rev 6/2021 a Shop Drawing is submitted for review unless a longer period of time is indicated in the Contract Documents. 3. Schedule document submittals to provide all information for interrelated Work at one time. 4. Allow adequate time for ordering, fabricating, delivering, and installing product so construction of the Project is not delayed. D. Complete the following before submitting a Shop Drawing or Sample: 1. Prepare Shop Drawing Review and coordinate the Shop Drawing or Sample with other Shop Drawings and Samples and with the requirements of the Work and the Contract Documents; 2. Determine and verify specified performance and design criteria, installation requirements, materials,catalog numbers, and similar information with respect to Shop Drawings and Samples; 3. Determine and verify the suitability of materials and equipment offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and 4. Determine and verify information relative to Contractor's responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto. E. Determine and verify: 1. Accurate field measurements, quantities, and dimensions are shown on the Shop Drawings; 2. Location of existing structures, utilities, and equipment related to the Shop Drawing have been shown and conflicts between the products existing structures, utilities, and equipment have been identified; 3. Conflicts that impact the installation of the products have been brought to the attention of the OPT through the Designer; 4. Shop Drawings are complete for their intended purpose; and 5. Conflicts between the Shop Drawings related to the various Subcontractors and Suppliers have been resolved. F. Review Shop Drawings prior to submitting to the Designer. Certify that all Shop Drawings have been reviewed by the Contractor and are in strict conformance with the Contract Documents as modified by Addenda, Change Order, Field Order, or Contract Amendment when submitting Shop Drawings except for deviations specifically brought to the Designer's attention on an attached Shop Drawing Deviation Request form in accordance with Paragraph 25.09. G. Fabrication or installation of any products prior to the approval of Shop Drawings is done at the Contractor's risk. Defective products may be rejected at the Owner's option. H. Payment will not be made for products for which Shop Drawings or Samples are required until these are approved by the Designer. General Conditions 00 72 00-108 Corpus Christi Standards Rev 6/2021 25.04 Shop Drawing Requirements A. Provide adequate information in Shop Drawings and Samples so Designer can: 1. Assist the Owner in selecting colors,textures, or other aesthetic features. 2. Compare the proposed features of the product with the specified features and advise Owner that the product does, in general, conform to the Contract Documents. 3. Compare the performance features of the proposed product with those specified and advise the Owner that the product does, in general,conform to the performance criteria specified in the Contract Documents. 4. Review required certifications, guarantees, warranties, and service agreements for compliance with the Contract Documents. B. Include a complete description of the product to be furnished, including: 1. Type, dimensions, size, arrangement, and operational characteristics of the product; 2. Weights,gauges,materials of construction,external connections,anchors,and supports required; 3. All applicable standards such as ASTM or Federal specification numbers; 4. Fabrication and installation drawings, setting diagrams, manufacturing instructions, templates, patterns, and coordination drawings; 5. Mix designs for concrete, asphalt, or other materials proportioned for the Project; and 6. Complete and accurate field measurements for products which must fit existing conditions. Indicate on the document submittal that the measurements represent actual dimensions obtained at the Site. C. Submit Shop Drawings that require coordination with other Shop Drawings at the same time. Shop Drawings requiring coordination with other Shop Drawings will be rejected until a complete package is submitted. 25.05 Special Certifications and Reports A. Provide all required certifications with the Shop Drawings as specified in the individual Specification Sections: 1. Certified Test Reports (CTR): A report prepared by an approved testing agency giving results of tests performed on products to indicate their compliance with the Specifications. This report is to demonstrate that the product when installed will meet the requirements and is part of the Shop Drawing. Field tests may be performed by the Owner to determine that in place materials or products meet the same quality as indicated in the CTR submitted as part of the Shop Drawing. 2. Certification of Local Field Service (CLS): A certified letter stating that field service is available from a factory or supplier approved service organization located within a 300 mile radius of the Site. List names, addresses, and telephone numbers of approved service organizations on or attach it to the certificate. 3. Certification of Adequacy of Design (CAD): A certified letter from the manufacturer of the equipment stating that they have designed the equipment to be structurally stable General Conditions 00 72 00-109 Corpus Christi Standards Rev 6/2021 and to withstand all imposed loads without deformation, failure, or adverse effects to the performance and operational requirements of the unit. The letter shall state that mechanical and electrical equipment is adequately sized to be fully operational for the conditions specified or normally encountered by the product's intended use. 25.06 Warranties and Guarantees A. Provide all required warranties, guarantees, and related documents with the Shop Drawing. The effective date of warranties and guarantees will be the date of acceptance of the Work by the Owner. B. Identify all Extended Warranties, defined as any guarantee of performance for the product or system beyond the 1-year correction period described in the General Conditions. Issue the warranty certificate in the name of the Owner. Provide a Warranty Bond for Extended Warranties if required by Specification Sections. C. Provide a copy of all warranties in a separate document in accordance with Article 29. 25.07 Shop Drawing Submittal Procedures A. Submit Shop Drawings through the Designer. Send all documents in digital format for processing. 1. Provide all information requested in the Shop Drawing submittal form. Do not leave any blanks incomplete. If information is not applicable,enter NA in the space provided. The Shop Drawing submittal form is to be the first document in the file submitted. 2. Submit all documents in Portable Document Format(PDF). a. Create PDF documents from native format files unless files are only available from scanned documents. b. Rotate pages so that the top of each document appears at the top of the monitor screen when opened in PDF viewing software. c. Submit PDF document with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. d. Submit color PDF documents where color is required to interpret the Shop Drawing. Submit Samples and color charts per Paragraph 25.08.A. e. Create or convert documents to allow text to be selected for comments or searched using text search features. Run scanned documents through Optical Character Recognition (OCR) software if necessary. f. Flatten markups in documents to prevent markups made by Contractor from being moved or deleted. Flatten documents to allow markup recovery. g. Use software to reduce file size using default settings except the option for "Drop Metadata." Uncheck the "Drop Metadata" box when reducing file size. h. Add footers to each document with the Project name. General Conditions 00 72 00-110 Corpus Christi Standards Rev 6/2021 3. Submit each specific product or class of material separately so these can be tracked and processed independently. Do not submit Shop Drawings for more than one product in the same Shop Drawing. 4. Submit items specified in different Specification Sections separately unless they are part of an integrated system. 5. Define abbreviations and symbols used in Shop Drawings. a. Use terms and symbols in Shop Drawings consistent with the Contract Drawings. b. Provide a list of abbreviations and their meaning as used in the Shop Drawings. c. Provide a legend for symbols used on Shop Drawings. 6. Mark Shop Drawings to reference: a. Related Specification Sections, b. Drawing number and detail designation, c. Product designation or name, d. Schedule references, e. System into which the product is incorporated, and f. Location where the product is incorporated into the Project. B. Use the following conventions to markup Shop Drawings for review: 1. Make comments and corrections in the color blue. Add explanatory comments to the markup. 2. Highlight items in black that are not being furnished when the Supplier's standard drawings or information sheets are provided so that only the products to be provided are in their original color. 3. Make comments in the color yellow where selections or decisions by the Designer are required, but such selections do not constitute a deviation from the Contract Documents. Add explanatory comments to the markup to indicate the action to be taken by the Designer. 4. Make comments in the color orange that are deviation requests. Include the deviation request number on the Shop Drawing that corresponds to the deviation request on the Shop Drawing Deviation Request form. Include explanatory comments in the Shop Drawing Deviation Request form. 5. Mark dimensions with the prefix FD to indicate field verified dimensions on the Shop Drawings. C. Submit a Change Proposal per Article 12 to request modifications to the Contract Documents, including those for approval of"or equal" products when specifically allowed by the Contract Documents or as a substitution for specified products or procedures. D. Designate a Shop Drawing as requiring priority treatment in the comment section of the Shop Drawing submittal form to place the review of the Shop Drawing ahead of other Shop Drawings previously delivered. Shop Drawings are typically reviewed in the order received, unless Contractor requests that a different priority be assigned. Priority Shop Drawings will General Conditions 00 72 00-111 Corpus Christi Standards Rev 6/2021 be reviewed before other Shop Drawings for this Project already received but not yet reviewed. Use of this priority designation for Shop Drawings may delay the review of Shop Drawings previously submitted, pushing the processing of Shop Drawings beyond the 14-day target. Contractor is responsible for delays resulting from the use of the priority designation status on Shop Drawings. E. Complete the certification required by Paragraph 25.03. 25.08 Sample and Mockup Submittal Procedures A. Submit color charts and Samples for every product requiring color, texture, or finish selection. 1. Submit color charts and Samples only after Shop Drawings for the products have been approved. 2. Deliver all color charts and Samples at one time. 3. Provide Samples of adequate size to clearly illustrate the functional characteristics of the product, with integrally related parts and attachment devices. 4. Indicate the full range of color, texture, and patterns. 5. Deliver color charts and Samples to the field office and store for the duration of the Project 6. Notify the Designer that color charts and Samples have been delivered for approval using the Notification by Contractor form. 7. Submit color charts and Samples not less than 30 days prior to when these products are to be ordered or released for fabrication to comply with the Project schedule. 8. Remove Samples that have been rejected. Submit new Samples following the same process as for the initial Sample until Samples are approved. 9. Dispose of Samples when related Work has been completed and approved and disposal is approved by the Designer. At Owner's option, Samples will become the property of the Owner. B. Construct mockups for comparison with the Work being performed. 1. Construct mockups from the actual products to be used in construction per detailed Specification Sections. 2. Construct mockups of the size and in the area indicated in the Contract Documents. 3. Construct mockups complete with texture and finish to represent the finished product. 4. Notify the Designer that mockups have been constructed and are ready for approval using the Notification by Contractor form. Allow 2 weeks for OPT to approve of the mockup before beginning the Work represented by the mockup. 5. Remove mockups that have been rejected. Construct new mockups following the same process as for the initial mockup until mockup is approved. 6. Protect mockups until Work has been completed and accepted by the OPT. General Conditions 00 72 00-112 Corpus Christi Standards Rev 6/2021 7. Dispose of mockups when related Work has been completed and disposal is approved by the Designer. 25.09 Equal Non Specified Products A. Contractor may submit other manufacturers' products that are in full compliance with the Specification where Specifications list one or more manufacturers followed by the phase "or equal" or"or approved equal." 1. Submit a Shop Drawing as required by this article to document that the proposed product is equal or superior to the specified product. 2. Prove that the product is equal. It is not the OPT's responsibility to prove the product is not equal. a. Indicate on a point by point basis for each specified feature that the product is equal to the Contract Document requirements. b. Make a direct comparison with the specified manufacturer's published data sheets and available information. Provide this printed material with the Shop Drawing. c. The decision of the Designer regarding the acceptability of the proposed product is final. 3. Provide a typewritten certification that, in furnishing the proposed product as an equal, the Contractor: a. Has thoroughly examined the proposed product and has determined that it is equal or superior in all respects to the product specified. b. Has determined that the product will perform in the same manner and result in the same process as the specified product. c. Will provide the same warranties and/or bonds as for the product specified. d. Will assume all responsibility to coordinate any modifications that may be necessary to incorporate the product into the construction and will waive all claims for additional Work which may be necessary to incorporate the product into the Project which may subsequently become apparent. e. Will maintain the same time schedule as for the specified product. 25.10 Requests for Deviation A. Submit requests for deviation from the Contract Documents for any product that does not fully comply with the Contract Documents. B. Submit requests for deviation using the Shop Drawing Deviation Request form provided. Identify each deviation request as a separate item. Include all requested deviations that must be approved as a group together and identify them as a single item. C. Include a description of why the deviation is required and the impact on Contract Price or Contract Times. Include the amount of any cost savings to the Owner for deviations that result in a reduction in cost. D. Submit as a Change Proposal prior to submitting the Shop Drawing if the deviation will result in a change in Contract Price or Contract Times. General Conditions 00 72 00-113 Corpus Christi Standards Rev 6/2021 E. A Modification must be issued by the Designer for approval of a deviation. Approval of a requested Shop Drawing deviation by the Designer on the Shop Drawings Deviation Request form indicates approval of the requested deviation only on its technical merits as generally conforming to the Contract Documents. Deviations from the Contract Documents can only be approved by a Modification. 25.11 Designer Responsibilities A. Shop Drawings will be received by the Designer. Designer will log the documents and review per this Article for general conformance with the Contract Documents. 1. Designer's review and approval will be only to determine if the products described in the Shop Drawing or Sample will, after installation or incorporation into the Work, conform to the information given in the Contract Documents and be compatible with the design concept of the completed Project as a functioning whole as indicated by the Contract Documents. 2. Designer's review and approval will not extend to means, methods, techniques, sequences,or procedures of construction or to safety precautions or programs incident thereto. 3. Designer's review and approval of a separate item as such will not indicate approval of the assembly in which the item functions. B. Comments will be made on items called to the attention of the Designer for review and comment. Any marks made by the Designer do not constitute a blanket review of the document submittal or relieve the Contractor from responsibility for errors or deviations from the Contract requirements. 1. Designer will respond to Contractor's markups by either making markups directly in the Shop Drawings file using the color green or by attaching a Document Review Comments form with review comments. 2. Shop Drawings that are reviewed will be returned with one or more of the following status designations: a. Approved: Shop Drawing is found to be acceptable as submitted. b. Approved as Noted: Shop Drawing is Approved so long as corrections or notations made by Designer are incorporated into the Show Drawing. C. Not Approved: Shop Drawing or products described are not acceptable. 3. Shop Drawing will also be designated for one of the following actions: a. Final distribution: Shop Drawing is acceptable without further action and has been filed as a record document. b. Shop Drawing not required: A Shop Drawing was not required by the Contract Documents. Resubmit the document per Article 26. c. Cancelled: This action indicates that for some reason, the Shop Drawing is to be removed from consideration and all efforts regarding the processing of that document are to cease. General Conditions 00 72 00-114 Corpus Christi Standards Rev 6/2021 d. Revise and resubmit: Shop Drawing has deviations from the Contract Documents, significant errors, or is inadequate and must be revised and resubmitted for subsequent review. e. Resubmit with corrections made: Shop Drawing is "Approved as Noted," but has significant markups. Make correction and notations to provide a revised document with markup incorporated into the original document so that no markups are required. f. Returned without review due to excessive deficiencies: Document does not meet the requirement of the Specifications for presentation or content to the point where continuing to review the document would be counterproductive to the review process or clearly does not meet the requirements of the Contract Documents. Revise the Shop Drawing to comply with the requirements of this Section and resubmit. g. Actions a through c will close out the Shop Drawing review process and no further action is required as a Shop Drawing. Actions d through f require follow up action to close out the review process. 4. Drawings with a significant or substantial number of markings by the Contractor may be marked "Approved as Noted" and "Resubmit with corrections made." These drawings are to be revised to provide a clean record of the Shop Drawing. Proceed with ordering products as the documents are revised. 5. Dimensions or other data that does not appear to conform to the Contract Documents will be marked as "At Variance With" (AVW) the Contract Documents or other information provided. The Contractor is to make revisions as appropriate to comply with the Contract Documents. C. Bring deviations to the Shop Drawings to the attention of the Designer for approval by using the Shop Drawing Deviation Request form. Use a single line for each requested deviation so the Status and Action for each deviation can be determined for that requested deviation. If approval or rejection of a requested deviation will impact other requested deviations, then all related deviations should be included in that requested deviation line so the status and action can be determined on the requested deviation as a whole. D. Requested deviations will be reviewed as possible Modification to the Contract Documents. 1. A Requested deviation will be rejected as "Not Approved" if the requested deviation is unacceptable. Contractor is to revise and resubmit the Shop Drawing with corrections for approval. 2. A Field Order will be issued by the Designer for deviations approved by the Designer if the requested deviation is acceptable and if the requested deviation will not result in a change in Contract Price or Contract Times. Requested deviations from the Contract Documents may only be approved by Field Order. 3. A requested deviation will be rejected if the requested deviation is acceptable but the requested deviation will or should result in a change in Contract Price or Contract Times. Submit any requested deviation that requires a change in Contract Price or Contract Times as a Change Proposal for approval prior to resubmitting the Shop Drawing. General Conditions 00 72 00-115 Corpus Christi Standards Rev 6/2021 E. Contractor is to resubmit the Shop Drawing until it is acceptable and marked Approved or Approved as Noted and is assigned an action per Paragraph 25.11 that indicates that the Shop Drawing process is closed. F. Information that is submitted as a Shop Drawings that should be submitted as Record Data or other type of document, or is not required may be returned without review, or may be deleted. No further action is required and the Shop Drawing process for this document will be closed. 25.12 Resubmission Requirements A. Make all corrections or changes in the documents required by the Designer and resubmit to the Designer until approved. 1. Revise initial drawings or data and resubmit as specified for the original document. 2. Highlight or cloud in green those revisions which have been made in response to the previous reviews by the Designer. This will include changes previously highlighted or clouded in yellow to direct attention to Designer to items requiring selections or decisions by the Designer or highlighted or clouded in orange for a requested deviation from the Contract Documents. 3. Highlight and cloud new items in yellow where selections or decisions by the Designer are required, but such selections do not constitute a deviation from the Contract Documents. Add explanatory comments to the markup to indicate the action to be taken by the Designer. 4. Highlight and cloud new items in orange that are deviation requests. Include the deviation request number on the Shop Drawing that corresponds to the deviation request on the Shop Drawing Deviation Request form. Numbering for these new items is to start with the next number following the last Shop Drawing deviation requested. Include explanatory comments in the Shop Drawing Deviation Request form. B. Pay for excessive review of Shop Drawings. 1. Excessive review of Shop Drawings is defined as any review required after the original review has been made and the first resubmittal has been checked to see that corrections have been made. 2. Review of Shop Drawings or Samples will be an additional service requiring payment by the Contractor if the Contractor submits a substitution for a product for which a Shop Drawing or Sample has previously been approved, unless the need for such change is beyond the control of Contractor. 3. Cost for additional review time will be billed to the Owner by the Designer for the actual hours required for the review of Shop Drawings by Designer and in accordance with the rates listed in SECTION 00 73 00 SUPPLEMENTARY CONDITIONS. 4. A Set-off will be included in each Application for Payment to pay costs for the additional review to the Owner on a monthly basis. The Set-off will be based on invoices submitted to Owner for these services. General Conditions 00 72 00-116 Corpus Christi Standards Rev 6/2021 5. Need for more than one resubmission or any other delay of obtaining Designer's review of Shop Drawings will not entitle the Contractor to an adjustment in Contract Price or an extension of Contract Times. ARTICLE 26—RECORD DATA 26.01 Work Included A. Submit Record Data as required by the Contract Documents and as reasonably requested by the OPT. Provide Record Data for all products unless a Shop Drawing is required for the same item. B. Submit Record Data to provide documents that allow the Owner to: 1. Record the products incorporated into the Project for the Owner; 2. Review detailed information about the products regarding their fabrication,installation, commissioning, and testing; and 3. Provide replacement or repair of the products at some future date. C. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the receipt or cursory review of Record Data. Contract modifications can only be approved by Change Order or Field Order. D. Provide various reports or other documents that Contract Documents require for record purposes. 26.02 Quality Assurance A. Submit legible, accurate, and complete documents presented in a clear, easily understood manner. Record Data not meeting these criteria will be rejected. 26.03 Contractor's Responsibilities A. Submit Record Data in accordance with SECTION 00 73 00 SUPPLEMENTARY CONDITIONS. B. Include Record Data in the Schedule of Documents required by Article 24 to indicate the Record Data to be submitted,the dates on which documents are to be sent to the Designer for review, and proposed dates that the product will be incorporated into the Project. C. Complete the following before submitting Record Data: 1. Prepare Record Data and coordinate with Shop Drawings or Samples, other Record Data, and with the requirements of the Work and the Contract Documents; 2. Determine and verify specified performance and design criteria, installation requirements, materials, catalog numbers, and similar information; 3. Determine and verify the suitability of materials and equipment offered with respect to the indicated application, fabrication, shipping, handling, storage, assembly, and installation pertaining to the performance of the Work; and 4. Determine and verify information relative to Contractor's responsibilities for means, methods, techniques, sequences, and procedures of construction, and safety precautions and programs incident thereto. General Conditions 00 72 00-117 Corpus Christi Standards Rev 6/2021 D. Determine and verify: 1. Accurate field measurements, quantities, and dimensions are shown on the Record Data; 2. Location of existing structures, utilities, and equipment related to the Record Data have been shown and conflicts between the products existing structures, utilities, and equipment have been identified; 3. Conflicts that impact the installation of the products have been brought to the attention of the OPT through the Designer; 4. Record Data are complete for their intended purpose; and 5. Conflicts between the Record Data related to the various Subcontractors and Suppliers have been resolved. E. Review Record Data prior to submitting to the Designer. Certify that all Record Data has been reviewed by the Contractor and is in strict conformance with the Contract Documents as modified by Addenda, Change Order, Field Order, or Contract Amendment when submitting Record Data. 26.04 Record Data Requirements A. Include a complete description of the material or equipment to be furnished, including: 1. Type,dimensions,size,arrangement,model number,and operational parameters of the components; 2. Weights,gauges,materials of construction,external connections,anchors,and supports required; 3. All applicable standards such as ASTM or Federal specification numbers; 4. Fabrication and installation drawings, setting diagrams, manufacturing instructions, templates, patterns, and coordination drawings; 5. Mix designs for concrete, asphalt or other materials proportioned for the Project; and 6. Complete and accurate field measurements for products which must fit existing conditions. Indicate on the document submittal that the measurements represent actual dimensions obtained at the Site. 26.05 Special Certifications and Reports A. Provide all required certifications with the Record Data as specified in the individual Specification Sections: 1. Certified Test Reports (CTR): A report prepared by an approved testing agency giving results of tests performed on products to indicate their compliance with the Specifications. This report is to demonstrate that the product when installed will meet the requirements and is part of the Record Data. Field tests may be performed by the Owner to determine that in place materials or products meet the same quality as indicated in the CTR submitted as part of the Record Data. General Conditions 00 72 00-118 Corpus Christi Standards Rev 6/2021 26.06 Warranties and Guarantees A. Provide all required warranties, guarantees, and related documents with the Record Data. The effective date of warranties and guarantees will be the date of acceptance of the Work by the Owner. B. Identify all Extended Warranties, defined as any guarantee of performance for the product or system beyond the 1 year correction period described in the General Conditions. Issue the warranty certificate in the name of the Owner. Provide a Warranty Bond for Extended Warranties if required. C. Provide a copy of all warranties in a separate document in accordance with Article 29. 26.07 Record Data Submittal Procedures A. Submit Record Data through the Designer. Send all documents in digital format for processing. 1. Provide all information requested in the Record Data submittal form. Do not leave any blanks incomplete. If information is not applicable,enter NA in the space provided. The Record Data submittal form is to be the first document in the file. 2. Submit all documents in Portable Document Format (PDF). a. Create PDF documents from native format files unless files are only available from scanned documents. b. Rotate pages so that the top of each document appears at the top of the monitor screen when opened in PDF viewing software. c. Submit PDF document with adequate resolution to allow documents to be printed in a format equivalent to the document original. Documents are to be scalable to allow printing on standard 8-1/2 x 11 or 11 x 17 paper. d. Submit color PDF documents where color is required to interpret the Record Data. e. Create or convert documents to allow text to be selected for comments or searched using text search features. Run scanned documents through Optical Character Recognition (OCR) software if necessary. f. Flatten markups in documents to prevent markups made by Contractor from being moved or deleted. Flatten documents to allow markup recovery. g. Use software to reduce file size using default settings except the option for "Drop Metadata." Uncheck the "Drop Metadata" box when reducing file size. h. Add footers to each document with the Project name. 3. Submit each specific product, class of material, or product separately so these can be tracked and processed independently. Do not submit Record Data for more than one system in the same Record Data. 4. Submit items specified in different Specification Sections separately unless they are part of an integrated system. 5. Define abbreviations and symbols used in Record Data. General Conditions 00 72 00-119 Corpus Christi Standards Rev 6/2021 a. Use terms and symbols in Record Data consistent with the Contract Drawings. b. Provide a list of abbreviations and their meaning as used in the Record Data. C. Provide a legend for symbols used on Record Data. 6. Mark Record Data to reference: a. Related Specification Sections, b. Drawing number and detail designation, c. Product designation or name, d. Schedule references, e. System into which the product is incorporated, and f. Location where the product is incorporated into the Project. B. Submit a Change Proposal per Article 12 to request modifications to the Contract Documents, including those for approval of"or equal" products when specifically allowed by the Contract Documents or as a substitution for specified products or procedures. Deviations from the Contract Documents can only be approved by a Modification. C. Complete the certification required by Paragraph 26.03. 26.08 Designer's Responsibilities A. Record Data will be received by the Designer, logged, and provided to Owner as the Project record. 1. Record Data may be reviewed to see that the information provided is adequate for the purpose intended. Record Data not meeting the requirements of Paragraph 26.02 may be rejected as unacceptable. 2. Record Data is not reviewed for compliance with the Contract Documents. Comments may be returned if deviations from the Contract Documents are noted during the cursory review performed to see that the information is adequate. 3. Contractor's responsibility for full compliance with the Contract Documents is not relieved by the review of Record Data. Contract modifications can only be approved by a Modification. B. Designer may take the following action in processing Record Data: 1. File Record Data as received if the cursory review indicates that the document meets the requirements of Paragraph 26.02. Document will be given the status of "Filed as Received" and no further action is required on that Record Data. 2. Reject the Record Data for one of the following reasons: a. The document submittal requirements of the Contract Documents indicate that the document submitted as Record Data should have been submitted as a Shop Drawing. The Record Data will be marked "Rejected" and "Submit Shop Drawing." No further action is required on this document as Record Data and the Record Data process will be closed. Resubmit the document as a Shop Drawing per Article 25. General Conditions 00 72 00-120 Corpus Christi Standards Rev 6/2021 b. The cursory review indicates that the document does not meet the requirements of Paragraph 26.02. The Record Data will be marked "Rejected" and "Revise and Resubmit." Contractor is to resubmit the Record Data until it is acceptable and marked "Filed as Received." When Record Data is filed, no further action is required, and the Record Data process will be closed. c. The Record Data is not required by the Contract Documents nor is the Record Data applicable to the Project. The Record Data will be marked "Rejected" and "Cancel -Not Required." No further action is required,and the Record Data process will be closed. C. Contractor is to resubmit the Record Data until it is acceptable and marked "Filed as Received." ARTICLE 27—CONSTRUCTION PROGRESS SCHEDULE 27.01 Requirements A. Prepare and submit a Progress Schedule for the Work and update the schedule on a monthly basis for the duration of the Project. B. Provide schedule in adequate detail to allow Owner to monitor progress and to relate document processing to sequential activities of the Work. C. Incorporate and specifically designate the dates of anticipated submission of documents and the dates when documents must be returned to the Contractor into the schedule. D. Assume complete responsibility for maintaining the progress of the Work per the schedule submitted. E. Schedule Work based upon a six day work week. 27.02 Document Submittal A. Submit Progress Schedules in accordance with Article 24. B. Submit a preliminary schedule within 10 days after the Notice of Award. The schedule is to be available at the pre-construction conference. C. Submit a detailed schedule at least 10 days prior to the first payment request. D. Submit Progress Schedule updates monthly with Applications for Payment to indicate the progress made on the Project to that date. Failure to submit the schedule may cause delay in the review and approval of Applications for Payment. 27.03 Schedule Requirements A. Schedule is to be in adequate detail to: 1. Assure adequate planning, scheduling, and reporting during the execution of the Work; 2. Assure the coordination of the Work of the Contractor and the various Subcontractors and Suppliers; 3. Assist in monitoring the progress of the Work; and General Conditions 00 72 00-121 Corpus Christi Standards Rev 6/2021 4. Assist in evaluating proposed changes to the Contract Times and Project schedule. B. Provide personnel with 5 years' minimum experience in scheduling construction work comparable to this Project. Prepare the schedule using acceptable scheduling software. C. Provide the schedule in the form of a computer generated critical path schedule which includes Work to be performed on the Project. It is intended that the schedule accomplish the following: 1. Give early warning of delays in time for correction. 2. Provide detailed plans for the execution of the Work in the form of future activities and events in sequential relationships. 3. Establish relationships of significant planned Work activities and provide a logical sequence for planned Work activities. 4. Provide continuous current status information. 5. Allow analysis of the Contractor's program for the completion of the Project. 6. Permit schedules to be revised when the existing schedule is not achievable. 7. Log the progress of the Work as it actually occurs. D. Prepare a time scaled CPM arrow or precedence diagram to indicate each activity and its start and stop dates. 1. Develop Milestone dates and Project completion dates to conform to time constraints, sequencing requirements and Contract completion date. 2. Use calendar day durations while accounting for holidays and weather conditions in the projection of the duration of each activity. 3. Clearly indicate the critical path for Work to complete the Project. E. Provide a time scaled horizontal bar chart which indicates graphically the Work scheduled at any time during the Project. The chart is to indicate: 1. Complete sequence of construction by activity; 2. Identification of the activity by structure, location, and type of Work; 3. Chronological order of the start of each item of Work; 4. The activity start and stop dates; 5. The activity duration; 6. Successor and predecessor relationships for each activity; 7. A clearly indicated single critical path; and 8. Projected percentage of completion, based on dollar value of the Work included in each activity as of the first day of each month. F. Provide a schedule incorporating the Schedule of Documents provided in accordance with Article 24 indicating: 1. Specific date each document is to be delivered to the Designer. 2. Specific date each document must be received in order to meet the proposed schedule. General Conditions 00 72 00-122 Corpus Christi Standards Rev 6/2021 3. Allow a reasonable time to review documents, taking into consideration the size and complexity of the document, other documents being processed, and other factors that may affect review time. 4. Allow time for re-submission of each document. Contractor is responsible for delays associated with additional time required to review incomplete or erroneous documents and for time lost when documents are submitted for products that do not meet Specification requirements. 27.04 Schedule Revisions A. Revise the schedule if it appears that the schedule no longer represents the actual progress of the Work. 1. Submit a written report if the schedule indicates that the Project is more than 30 days behind schedule. The report is to include: a. Number of days behind schedule; b. Narrative description of the steps to be taken to bring the Project back on schedule; and c. Anticipated time required to bring the Project back on schedule. 2. Submit a revised schedule indicating the action that the Contractor proposes to take to bring the Project back on schedule. B. Revise the schedule to indicate any adjustments in Contract Times approved by Modification. 1. Include a revised schedule with Change Proposals if a change in Contract Times is requested. 2. OPT will deem any Change Proposal that does not have a revised schedule and request for a change in Contract Times as having no impact on the ability of the Contractor to complete the Project within the Contract Times. C. Updating the Project schedule to reflect actual progress is not considered a revision to the Project schedule. D. Applications for Payment may not be recommended for payment without a revised schedule and if required, the report indicating the Contractor's plan for bringing the Project back on schedule. 27.OS Float Time A. Define float time as the amount of time between the earliest start date and the latest start date of a chain of activities on the construction schedule. B. Float time is not for the exclusive use or benefit of either the Contractor or Owner. C. Where several subsystems each have a critical path, the subsystem with the longest time of completion is the critical path and float time is to be assigned to other subsystems. D. Contract Times cannot be changed by the submission of a schedule. Contract Times can only be modified by a Change Order or Contract Amendment. General Conditions 00 72 00-123 Corpus Christi Standards Rev 6/2021 E. Schedule completion date must be the same as the Contract completion date. Time between the end of construction and the Contract completion date is float time. ARTICLE 28—VIDEO AND PHOTOGRAPHIC DOCUMENTATION 28.01 Work Included A. Provide a video recording of the Site prior to the beginning of construction. 1. Record the condition of all existing facilities in or abutting the construction area (right- of-way)including but not limited to streets,curb and gutter, utilities,driveways,fencing, landscaping, etc. 2. Record after construction staking is complete but prior to any clearing. 3. Provide one copy of the recording, dated and labeled to the OAR before the start of construction. Provide additional recording as directed by the OAR if the recording provided is not considered suitable for the purpose of recording pre-existing conditions. B. Furnish an adequate number of photographs of the Site to clearly depict the completed Project. 1. Provide a minimum of ten different views. 2. Photograph a panoramic view of the entire Site. 3. Photograph all significant areas of completed construction. 4. Completion photographs are not to be taken until all construction trailers, excess materials, trash, and debris have been removed. 5. Employ a professional photographer approved by the OAR to photograph the Project. 6. Provide one aerial photograph of the Site from an angle and height to include the entire Site while providing adequate detail. C. All photographs, video recordings, and a digital copy of this media are to become the property of the Owner. Photographs or recordings may not be used for publication,or public or private display without the written consent of the Owner. 28.02 Quality Assurance A. Provide clear photographs and recordings taken with proper exposure. View photographs and recordings in the field and take new photographs or recordings immediately if photos of an adequate print quality cannot be produced or video quality is not adequate. Provide photographs with adequate quality and resolution to permit enlargements. 28.03 Document Submittal A. Submit photographic documentation as Record Data in accordance with Article 24. B. Submit two DVDs of the video recording as Record Data in accordance with Article 24. General Conditions 00 72 00-124 Corpus Christi Standards Rev 6/2021 28.04 Photographs A. Provide photographs in digital format with a minimum resolution of 1280 x 960, accomplished without a digital zoom. B. Take photographs at locations acceptable to the OAR. C. Provide two color prints of each photograph and a digital copy on a DVD of each photograph taken. D. Identify each print on back with: 1. Project name. 2. Date,time, location, and orientation of the exposure. 3. Description of the subject of photograph. E. Submit photographs in clear plastic sheets designed for photographs. Place only one photograph in each sheet to allow the description on the back to be read without removing the photograph. F. Final photographs are to include two 8-by-10-inch glossy color prints for each of ten photographs selected by the OAR. These photographs are in addition to normal prints. 28.05 Video Recording A. Provide digital format on DVD that can be played with Windows Media Player in common format in full screen mode. B. Identify Project on video by audio or visual means. C. Video file size should not exceed 400 MB. D. Video resolution shall be 1080p. E. The quality of the video must be sufficient to determine the existing conditions of the construction area. Camera panning must be performed while at rest, do not pan the camera while walking or driving. Camera pans should be performed at intervals sufficient to clearly view the entire construction area. F. DVD shall be labeled with construction stationing and stationing should be called out, voice recorded, in the video. G. The entire construction area recording shall be submitted at once. Sections submitted separately will not be accepted. H. Pipeline projects should be recorded linearly from beginning to end. ARTICLE 29—EXECUTION AND CLOSEOUT 29.01 Substantial Completion A. Notify the OAR that the Work or a designated portion of the Work is substantially complete per the General Conditions. Include a list of the items remaining to be completed or corrected before the Project will be considered to be complete. General Conditions 00 72 00-125 Corpus Christi Standards Rev 6/2021 B. OPT will visit the Site to observe the Work within 30 days after notification is received to determine the status of the Project. C. OAR will notify the Contractor, within 120 days after notification, that the Work is either substantially complete or that additional Work must be performed before the Project will be considered substantially complete. 1. OAR will notify the Contractor of items that must be completed before the Project will be considered substantially complete. 2. Correct the noted deficiencies in the Work. 3. Notify the OAR when the items of Work in the OAR's notice have been completed. 4. OPT will revisit the Site and repeat the process. 5. OAR will issue a Certificate of Substantial Completion to the Contractor when the OPT considers the Project to be substantially complete. The Certificate will include a tentative list of items to be corrected before Final Payment will be recommended. 6. Review the list and notify the OAR of any objections to items on the list within 10 days after receiving the Certificate of Substantial Completion. 29.02 Final Inspections A. Notify the OAR when: 1. Work has been completed in compliance with the Contract Documents; 2. Equipment and systems have been tested per Contract Documents and are fully operational; 3. Final Operations and Maintenance Manuals have been provided to the Owner and all operator training has been completed; 4. Specified spare parts and special tools have been provided; and 5. Work is complete and ready for final inspection. B. OPT will visit the Site to determine if the Project is complete and ready for Final Payment within 30 days after the notice is received. C. Designer will notify the Contractor that the Project is complete or will notify the Contractor that Work is Defective. D. Take immediate steps to correct Defective Work. Notify the Designer when Defective Work has been corrected. OPT will visit the Site to determine if the Project is complete and the Work is acceptable. OAR will notify the Contractor that the Project is complete or will notify the Contractor that Work is Defective. E. Submit the Request for Final Payment with the closeout documents described in Paragraph 29.04 if notified that the Project is complete, and the Work is acceptable. 29.03 Reinspection Fees A. Owner may impose a Set-off against the Application for Payment in accordance with the General Conditions to compensate the OPT for additional visits to the Project if additional Work is required. General Conditions 00 72 00-126 Corpus Christi Standards Rev 6/2021 29.04 Closeout Documents Submittal A. Record Documents per Article 20. B. Warranties and bonds. C. Equipment installation reports on equipment. D. Shop Drawings, Record Data, and other documents as required by the Contract Documents. E. Evidence of continuing insurance and bond coverage as required by the Contract Documents. F. Final Photographs per Article 28. 29.05 Transfer of Utilities A. If applicable to the Project,transfer utilities to the Owner when the Certificate of Substantial Completion has been issued and the Work has been occupied by the Owner. B. Submit final meter readings for utilities and similar data as of the date the Owner occupied the Work. 29.06 Warranties, Bonds and Service Agreements A. Provide warranties, bonds, and service agreements required by the Contract Documents. B. The date for the start of warranties, bonds, and service agreements is established per the Contract Documents. C. Compile warranties, bonds, and service agreements and review these documents for compliance with the Contract Documents. 1. Provide a log of all equipment covered under the 1-year correction period specified in the Contract Documents and all products for which special or extended warranties or guarantees are provided. Index the log by Specification Section number on forms provided. Include items 2.e through 2.g below in the tabulation. 2. Provide a copy of specific warranties or guarantees under a tab indexed to the log. Each document is to include: a. A description of the product or Work item; b. The firm name with the name of the principal, address, and telephone number; c. Signature of the respective Supplier or Subcontractor to acknowledge existence of the warranty obligation for extended warranties and service agreements; d. Scope of warranty, bond, or service agreement; e. Indicate the start date for the correction period specified in the Contract Documents for each product and the date on which the specified correction period expires. f. Indicate the start date for extended warranties for each product and the date on which the specified extended warranties period expires. g. Start date, warranty or guarantee period, and expiration date for each warranty, bond, and service agreement; General Conditions 00 72 00-127 Corpus Christi Standards Rev 6/2021 h. Procedures to be followed in the event of a failure; and i. Specific instances that might invalidate the warranty or bond. D. Submit digital copies of the documents to the Designer for review. E. Submit warranties, bonds, and service agreements within 10 days after equipment or components are placed in service. ARTICLE 30—MISCELLANEOUS 30.01 Computation of Times A. Exclude the first day and include the last day when determining dates for a period of time referred to in the Contract Documents by days. The last day of this period is to be omitted from the determination if it falls on a Sunday or a legal holiday. B. All references and conditions for a Calendar Day Contract in the Contract Documents apply for a Fixed Date Contract. A Fixed Date Contract is one in which the calendar dates for reaching Substantial Completion and/or final completion are specified in lieu of identifying the number of days involved. 30.02 Owner's Right to Audit Contractor's Records A. By execution of the Contract, Contractor grants Owner the right to audit, examine, inspect and/or copy, at Owner's election at all reasonable times during the term of this Contract and for a period of four (4) years following the completion or termination of the Work, all of Contractor's written and electronically stored records and billings relating to the performance of the Work under the Contract Documents. The audit, examination or inspection may be performed by an Owner designee,which may include its internal auditors or an outside representative engaged by Owner. Contractor agrees to retain its records for a minimum of four(4)years following termination of the Contract, unless there is an ongoing dispute under the Contract,then, such retention period must extend until final resolution of the dispute. As used in these General Conditions, "Contractor written and electronically stored records" include any and all information, materials and data of every kind and character generated as a result of the work under this Contract. Examples of Contractor written and electronically stored records include, but are not limited to:accounting data and reports, billings, books, general ledgers, cost ledgers, invoices, production sheets, documents, correspondence, meeting notes, subscriptions, agreements, purchase orders, leases, contracts, commitments, arrangements, notes, daily diaries, reports, drawings, receipts, vouchers, memoranda, time sheets, payroll records, policies, procedures, Subcontractor agreements, Supplier agreements, rental equipment proposals, federal and state tax filings for any issue in question, along with any and all other agreements, sources of information and matters that may, in Owner's sole judgment, have any bearing on or pertain to any matters, rights, duties or obligations under or covered by any Contract Documents. B. Owner agrees to exercise the right to audit, examine or inspect Contractor's records only during regular business hours. Contractor agrees to allow Owner and/or Owner's designee access to all of the Contractor's Records, Contractor's facilities, and current or former employees of Contractor, deemed necessary by Owner or its designee(s), to perform such audit, inspection or examination. Contractor also agrees to provide adequate and General Conditions 00 72 00-128 Corpus Christi Standards Rev 6/2021 appropriate work space necessary for Owner or its designees to conduct such audits, inspections or examinations. C. Contractor must include this Paragraph 30.02 in any Subcontractor, supplier or vendor contract. 30.03 Independent Contractor A. Contractor is to perform its duties under this Contract as an independent contractor. The Contractor's Team and their personnel are not considered to be employees or agents of the Owner. Nothing in this Contract is to be interpreted as granting Contractor's Team the right or authority to make commitments for the Owner. This Contract does not constitute or create a joint venture, partnership or formal business organization of any kind. 30.04 Cumulative Remedies A. The duties and obligations imposed by these General Conditions and the rights and remedies available to the Owner or Contractor by these General Conditions are in addition to, and are not a limitation of,the rights and remedies which are otherwise imposed or available by: 1. Laws or Regulations; 2. Special warranties or guarantees; or 3. Other provisions of the Contract Documents. B. The provisions of this Paragraph 30.04 are as effective as if repeated specifically in the Contract Documents in connection with each particular duty, obligation, right and remedy to which they apply. 30.05 Limitation of Damages A. Owner is not liable to Contractor for claims, costs, losses or damages sustained by Contractor's Team associated with other projects or anticipated projects. B. Contractor waives claims for consequential damages, incidental or special damages arising out of or relating to this Contract, whether the damages are claimed in contract, tort or on any other basis. 30.06 No Waiver A. The failure of Owner or Contractor to enforce any provision of this Contract does not constitute a waiver of that provision or affect the enforceability of that provision or the remainder of this Contract. 30.07 Severability A. If a court of competent jurisdiction renders a part of this Contract invalid or unenforceable, that part is to be severed and the remainder of this Contract continues in full force. General Conditions 00 72 00-129 Corpus Christi Standards Rev 6/2021 30.08 Survival of Obligations A. Representations, indemnifications, warranties, guarantees and continuing obligations required by the Contract Documents survive completion and acceptance of the Work or termination of the Contract. 30.09 No Third Party Beneficiaries A. Nothing in this Contract can be construed to create rights in any entity other than the Owner and Contractor. Neither the Owner nor Contractor intends to create third party beneficiaries by entering into this Contract. 30.10 Assignment of Contract A. This Contract may not be assigned in whole or in part by the Contractor without the prior written consent of the Owner. 30.11 No Waiver of Sovereign Immunity A. The Owner has not waived its sovereign immunity by entering into and performing its obligations under this Contract. B. This Contract is to perform a governmental function solely for the public benefit. 30.12 Controlling Law A. This Contract is governed by the laws of the State of Texas without regard to its conflicts of laws. Venue for legal proceedings lies exclusively in Nueces County, Texas. Cases must be filed and tried in Nueces County and cannot be removed from Nueces County,Texas. 30.13 Conditions Precedent to Right to Sue A. Notwithstanding anything herein to the contrary,Contractor will have at least 90 days to give notice of a claim for damages as a condition precedent to the right to sue on the Contract, subject to the contractual Claims and Alternative Dispute Resolution processes set forth herein. 30.14 Waiver of Trial by Jury A. Owner and Contractor agree that they have knowingly waived and do hereby waive the right to trial by jury and have instead agreed, in the event of any litigation arising out of or connected to this Contract, to proceed with a trial before the court, unless both parties subsequently agree otherwise in writing. 30.15 Attorney Fees A. The Parties expressly agree that, in the event of litigation, all parties waive rights to payment of attorneys' fees that otherwise might be recoverable, pursuant to the Texas Civil Practice and Remedies Code Chapter 38, Texas Local Government Code §271.153, the Prompt Payment Act, common law or any other provision for payment of attorney's fees. General Conditions 00 72 00-130 Corpus Christi Standards Rev 6/2021 30.16 Compliance with Laws A. Comply with the Americans with Disabilities Act of 1990 as amended (ADA) and Texas Architectural Barriers Act and all regulations relating to either statute. B. No qualified person shall on the basis of race, color, religion, national origin, gender, age or disability be excluded from participation in, be denied the benefits of, or be subjected to discrimination under any program or activity which receives or benefits from federal financial assistance. C. Comply with all applicable federal, state and city laws, rules and regulations. D. Each applicable provision and clause required by law to be inserted into the Contract shall be deemed to be enacted herein,and the Contract shall be read and enforced as though each were physically included herein. 30.17 Enforcement A. The City Manager or designee and the City Attorney or designee are fully authorized and will have the right to enforce all legal rights and obligations under the Contract without further authorization from City Council. 30.18 Subject to Appropriation A. Funds are appropriated by the Owner on a yearly basis. If for any reason, funds are not appropriated in any given year,the Owner may direct immediate suspension or termination of the Contract with no additional liability to the Owner. If the Contractor is terminated or suspended and the Owner requests remobilization at a later date, the Contractor may request payment for reasonable demobilization/remobilization costs. Such costs shall be addressed through a Change Order to the Contract. Under no circumstances may a provision or obligation under this Contract be interpreted as contrary to this paragraph. 30.19 Contract Sum A. The Contract Sum is stated in the Contract and, including authorized adjustments,is the total maximum not-to-exceed amount payable by Owner to Contractor for performance of the Work under the Contract Documents. Contractor accepts and agrees that all payments pursuant to this Contract are subject to the availability and appropriation of funds by the Corpus Christi City Council. If funds are not available and/or appropriated,this Contract shall immediately be terminated with no liability to any party to this Contract. 30.20 Contractor's Guarantee as Additional Remedy A. The Contractor's guarantee is a separate and additional remedy available to benefit the Owner. Neither the guarantee nor the expiration of the guarantee period will operate to reduce, release or relinquish any rights or remedies available to the Owner for any claims or causes of action against the Contractor or any other individual or entity. 30.21 Notices. A. Any notice required to be given to Owner under any provision in this Contract must include a copy to OAR by mail or e-mail. General Conditions 00 72 00-131 Corpus Christi Standards Rev 6/2021 30.22 Public Information A. The requirements of Subchapter J, Chapter 552, Government Code, may apply to this contract, and Contractor agrees that the contract can be terminated if Contractor knowingly or intentionally fails to comply with a requirement of that subchapter. END OF SECTION General Conditions 00 72 00-132 Corpus Christi Standards Rev 6/2021 00 73 00 SUPPLEMENTARY CONDITIONS These Supplementary Conditions amend or supplement SECTION 00 72 00 GENERAL CONDITIONS and other provisions of the Contract Documents. All provisions not amended or supplemented in these Supplementary Conditions remain in effect. The terms used in these Supplementary Conditions have the meanings stated in the General Conditions. Additional terms used in these Supplementary Conditions have the meanings stated below. ARTICLE 1—DEFINITIONS AND TERMINOLOGY SC-1.01 DEFINED TERMS A. The members of the OPT as defined in Paragraph 1.01.A.41 consists of the following organizations: City of Corpus Christi,Texas Garver, LLC B. Paragraph 1.01.A.54"Substantial Completion" is more specifically defined for this Project as: 1. The following items are fully functional and suitable for operation in accordance with the Contract Documents: a. Taxiway E is re-open and ready for Owner's use. ARTICLE 4—COMMENCEMENT AND PROGRESS OF THE WORK SC-4.04 DELAYS IN CONTRACTOR'S PROGRESS A. The allocation for delays in the Contractor's progress for rain days as set forth in General Conditions Paragraph 4.04.1) are to be determined as follows: 1. Include rain days in developing the schedule for construction. Schedule construction so that the Work will be completed within the Contract Times assuming that these rain days will occur. Incorporate residual impacts following rain days such as limited access to and within the Site, inability to work due to wet or muddy Site conditions, delays in delivery of equipment and materials, and other impacts related to rain days when developing the schedule for construction. Include all costs associated with these rain days and residual impacts in the Contract Price. 2. A rain day is defined as any day in which the amount of rain measured by the National Weather Services at the Power Street Stormwater Pump Station is 0.50 inch or greater. Records indicate the following average number of rain days for each month: Month Day Month Days January 3 July 3 February 3 August 4 March 2 September 7 April 3 October 4 Supplementary Conditions 00 73 00- 1 CCIA Taxiway Echo Rehabilitation Rev 3/2023 Project No: 26122 May 4 November 3 June 4 December 3 3. A total of 18 rain days have been set for this Project. An extension of time due to rain days will be considered only after 18 rain days have been exceeded in a calendar year and the OAR has determined that a detrimental impact to the construction schedule resulted from the excessive rainfall. Rain days are to be incorporated into the schedule and unused rain days will be considered float time which may be consumed by the Owner or Contractor in delay claims. ARTICLE 5 — AVAILABILITY OF LANDS; SUBSURFACE CONDITIONS AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS SC-5.03 SUBSURFACE AND PHYSICAL CONDITIONS A. This Supplementary Condition identifies documents referenced in General Conditions Paragraph 5.03.A which describe subsurface and physical conditions. 1. Geotechnical Reports include the following: a. Geotechnical Pavement and Subsurface Investigation for the Proposed Runway and Taxiway Pavement Rehabilitation Runway 13-31, Parallel Taxiway B and Associated Taxiways, by Rock Engineering and Testing Laboratory, February 24, 2021, - The Contractor may rely on the following Technical Data in using this document: 1) Existing pavement section information for Taxiway Echo—Boring B7 2. Drawings of physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) include the following: a. CCIA Rehabilitate Runway 18-36, Taxiway A & Associated Improvements Topographic Survey,CivilCorp, Inc., May 4, 2022-The Contractor may rely on the following Technical Data in using this document: 1) All information presented with regard to material type and general location. b. CCIA Rehabilitate Runway 13-31, Taxiway B, & Associated Improvements Topographic Survey,CivilCorp, Inc.,April 1, 2021-The Contractor may rely on the following Technical Data in using this document: 1) All information presented with regard to material type and general location. c. CCIA Taxiway Echo Rehabilitation Topographic Survey,Garver, March 15, 2026— The Contractor may rely on the following Technical Data in using this document: 1) All information presented with regards to drainage improvements information at intersection of Taxiway Echo and Alpha. SC-5.06 HAZARDOUS ENVIRONMENTAL CONDITIONS AT SITE A. This Supplementary Condition identifies documents referenced in General Conditions Paragraph 5.06 which describe Hazardous Environmental Conditions that have been identified at or adjacent to the Site. Supplementary Conditions 00 73 00-2 CCIA Taxiway Echo Rehabilitation Rev 3/2023 Project No: 26122 1. Environmental Reports include the following: None ARTICLE 6—BONDS AND INSURANCE SC-6.03 REQUIRED MINIMUM INSURANCE COVERAGE INSURANCE REQUIREMENTS CONTRACTOR'S INSURANCE AMOUNTS Provide the insurance coverage for at least the following amounts unless greater amounts are required by Laws and Regulations: Type of Insurance Minimum Insurance Coverage Commercial General Liability including 1. Commercial Broad Form 2. Premises—Operations 3. Underground Hazard 4. Products/Completed Operations $1,000,000 Per Occurrence 5. Contractual Liability $2,000,000 Aggregate 6 Independent Contractors 7. Personal &Advertising Injury Business Automobile Liability-Owned, Non- $500,000 Combined Single Limit Owned, Rented and Leased Workers' Compensation Statutory Employer's Liability $500,000/500,000/500,000 Excess Liability/Umbrella Liability $1,000,000 Per Occurrence Required if Contract Price>$5,000,000 Contractor's Pollution Liability / $1,000,000 Per Claim Environmental Impairment Coverage Not limited to sudden and accidental ❑ Required 0 Not Required discharge. To include long-term environmental impact for the disposal of pollutants/contaminants. Required if excavation > 5 ft or asbestos present Builder's Risk(All Perils including Collapse) Coverage limit shall be in the amount of the total cost of the project. Required for vertical structures and bridges ❑ Required 0 Not Required Installation/Equipment Floater Equal to Contract Price Required if installing city-owned equipment or storing contractor equipment on city- ❑ Required 0 Not Required owned property Supplementary Conditions 00 73 00-3 CCIA Taxiway Echo Rehabilitation Rev 3/2023 Project No: 26122 Owner's Protective Liability Equal to Contractor's Liability Insurance 0 Required ❑ Not Required ARTICLE 7—CONTRACTOR'S RESPONSIBILITIES SC-7.02 LABOR; WORKING HOURS B. Perform Work at the Site during regular working hours except as otherwise required for the safety or protection of person or the Work or property at the Site or adjacent to the Site and except as otherwise stated in the Contract Documents. Regular working hours are between sunrise and sundown Monday through Friday unless other times are specifically authorized in writing by OAR or agreed to by OAR Representatives. C. Do not perform Work on a Sunday or legal holiday without OAR's consent. The following legal holidays are observed by the Owner: Holiday Date Observed New Year's Day January 1 Martin Luther King Jr Day Third Monday in January Memorial Day Last Monday in May Juneteenth June 19 Independence Day July 4 Labor Day First Monday in September Thanksgiving Day Fourth Thursday in November Friday after Thanksgiving Friday after Thanksgiving Christmas Day December 25 SC-7.04 CONCERNING SUBCONTRACTORS, SUPPLIERS,AND OTHERS A. Add the following sentence to the end of Paragraph 7.04.A: "The Contractor's goal is to perform at least 30 percent of the Work, measured as a percentage of the Contract Price, using its own employees." B. At Owner's request, Contractor shall provide copies of all executed subcontracts for this project. ARTICLE 14—PREVAILING WAGE RATE REQUIREMENTS SC-14.04 PREVAILING WAGE RATES A. The minimum rates for various labor classifications as established by the Owner are shown below: Supplementary Conditions 00 73 00-4 CCIA Taxiway Echo Rehabilitation Rev 3/2023 Project No: 26122 Wage Determination Construction Type Project Type (WD) No TX21 Heavy Heavy Construction Projects (including Sewer and Water Line Construction and Drainage Projects) General Decision Number:TX2026002101/02/2026 Superseded General Decision Number: TX20250021 State:Texas Construction Type: Heavy Counties: Nueces and San Patricio Counties in Texas. HEAVY CONSTRUCTION PROJECTS(including Sewer and Water Line Construction and Drainage Projects) Modification Number Publication Date 0 01/02/2026 S UTX1987-001 12/01/1987 Rates Fringes CARPENTER(Excluding Form Setting).........................$ 9.05 Concrete Finisher................$ 7.56 ELECTRICIAN......................$ 13.37 2.58 Laborers: Supplementary Conditions 00 73 00-5 CCIA Taxiway Echo Rehabilitation Rev 3/2023 Project No: 26122 Common......................$ 7.25 Utility.....................$ 7.68 Power equipment operators: Backhoe.....................$ 9.21 Motor Grader................$ 8.72 ---------------------------------------------------------------- WELDERS-Receive rate prescribed for craft performing operation to which welding is incidental. ---------------------------------------------------------------- ---------------------------------------------------------------- Note: Executive Order(EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1,2017. If this contract is covered by the EO,the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year. Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care;to assist a family member(or person who is like family to the employee)who is ill, injured,or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member(or person who is like family to the employee)who is a victim of,domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts. Note: Executive Order 13658 generally applies to contracts Supplementary Conditions 00 73 00-6 CCIA Taxiway Echo Rehabilitation Rev 3/2023 Project No: 26122 subject to the Davis-Bacon Act that were awarded on or between January 1,2015 and January 29,2022, and that have not been renewed or extended on or after January 30, 2022. Executive Order 13658 does not apply to contracts subject only to the Davis-Bacon Related Acts regardless of when they were awarded. If a contract is subject to Executive Order 13658,the contractor must pay all covered workers at least$13.30 per hour(or the applicable wage rate listed on this wage determination, if it is higher)for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts. Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)). ---------------------------------------------------------------- The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination.The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate(current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate. Union Rate Identifiers Supplementary Conditions 00 73 00-7 CCIA Taxiway Echo Rehabilitation Rev 3/2023 Project No: 26122 A four-letter identifier beginning with characters other than ""SU"", ""UAVG"", ?SA?, or?SC?denotes that a union rate was prevailing for that classification in the survey. Example: PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification,which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198.The next number,005 in the example, is an internal number used in processing the wage determination.The date,07/01/2024 in the example, is the effective date of the most current negotiated rate. Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA)governing the classification. Union Average Rate Identifiers The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100%of the data reported for the classifications reflected union rates. EXAMPLE: UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio. The next number,0010 in the example, is an internal number used in producing the wage determination.The date,01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate. A UAVG rate will be updated once a year, usually in January,to reflect a weighted average of the current rates in the Supplementary Conditions 00 73 00-8 CCIA Taxiway Echo Rehabilitation Rev 3/2023 Project No: 26122 collective bargaining agreements on which the rate is based. Survey Rate Identifiers The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2)for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification.As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007 6/27/2024.SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based.The next number,007 in the example, is an internal number used in producing the wage determination.The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier. ?SU?wage rates typically remain in effect until a new survey is conducted. However,the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1). State Adopted Rate Identifiers The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state(or local)government were adopted under 29 C.F.R 1.3(g)-(h). Example:SAME2023-007 01/03/2024.SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based.The next number, 007 in the example, is an Supplementary Conditions 00 73 00-9 CCIA Taxiway Echo Rehabilitation Rev 3/2023 Project No: 26122 internal number used in producing the wage determination. The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA?identifier took effect under state law in the state from which the rates were adopted. ----------------------------------------------------------- WAGE DETERMINATION APPEALS PROCESS 1) Has there been an initial decision in the matter?This can be: a) a survey underlying a wage determination b)an existing published wage determination c) an initial WHD letter setting forth a position on a wage determination matter d) an initial conformance(additional classification and rate) determination On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to: Branch of Wage Surveys Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be Supplementary Conditions 00 73 00- 10 CCIA Taxiway Echo Rehabilitation Rev 3/2023 Project No: 26122 directed to the WHD Branch of Construction Wage Determinations. Requests can be submitted via email to BCWD-Office@dol.gov or by mail to: Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 2) If an initial decision has been issued,then any interested party(those affected by the action)that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator(See 29 CFR Part 1.8 and 29 CFR Part 7). Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to: Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W. Washington, DC 20210 The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description,area practice material, etc.)that the requestor considers relevant to the issue. 3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to: Administrative Review Board U.S. Department of Labor Supplementary Conditions 00 73 00- 11 CCIA Taxiway Echo Rehabilitation Rev 3/2023 Project No: 26122 200 Constitution Avenue, N.W. Washington, DC 20210. ---------------------------------------------------------------- ---------------------------------------------------------------- END OF GENERAL DECISION ARTICLE 19—PROJECT MANAGEMENT AND COORDINATION SC-19.21 COOPERATION WITH PUBLIC AGENCIES C. For the Contractor's convenience, the following telephone numbers are listed: Public Agencies/Contacts Phone Number John Hyland (Public Safety) Corpus 361-826-1782 Christi International Airport Victor Gonzalez (Construction Manager)Corpus Christi International 361-826-1788 Airport City Engineer 361-826-3500 Philip Huntley (Project Manager) 512-485-0026 Garver Traffic Engineering 361-826-3547 Police Department 361-882-2600 361-826-1800 (361-826-1818 after Water/Wastewater/Stormwater hours) Gas Department 361-885-6900 (361-885-6942 after hours) Parks& Recreation Department 361-826-3461 Street Department 361-826-1875 City Street Div.for Traffic Signals 361-826-1610 Solid Waste & Brush 361-826-1973 IT Department(City Fiber) 361-826-1956 AEP 1-877-373-4858 AT&T 361-881-2511 (1-800-824-4424 after hours) Grande Communications 1-866-247-2633 Spectrum Communications 1-800-892-4357 Supplementary Conditions 00 73 00- 12 CCIA Taxiway Echo Rehabilitation Rev 3/2023 Project No: 26122 Public Agencies/Contacts Phone Number Crown Castle Communications 1-888-632-0931 (Network Operations Center) Centu ryLi n k 361-208-0730 Windstream 1-800-600-5050 Regional Transportation Authority 361-289-2712 Port of Corpus Christi Authority Engr. 361-882-5633 TxDOT Area Office 361-808-2500 Corpus Christi ISD 361-695-7200 ARTICLE 23—MINORITY/MBD/DBE PARTICIPATION POLICY SC-23.03 Goals A. The goals for participation by minorities and Minority Business Enterprises expressed in percentage terms for the Contractor's aggregate work force on all construction Work for the Contract award shall be 1. Disadvantaged Business Enterprise participation goal for this Project has been established to be 0%. ARTICLE 25—SHOP DRAWINGS SC-25.03 CONTRACTOR'S RESPONSIBILITIES A. Provide Shop Drawings for the following items: Specification Section Shop Drawing Description L-125 L-852T In-Pavement Light SC-25.12 RESUBMISSION REQUIREMENTS B. Pay for excessive review of Shop Drawings.—NOT APPLICABLE 1. Cost for additional review time will be billed to the Owner by the Designer for the actual hours required for the review of Shop Drawings by Designer and in accordance with the rates listed below: Supplementary Conditions 00 73 00- 13 CCIA Taxiway Echo Rehabilitation Rev 3/2023 Project No: 26122 ARTICLE 26—RECORD DATA SC-26.03 CONTRACTOR'S RESPONSIBILITIES A. Submit Record Data for the following items: Specification Section Record Data Description Construction Record Drawings SC-30.21 Notices. B. Strict compliance is required for all notice provisions in this Contract. END OF SECTION Supplementary Conditions 00 73 00- 14 CCIA Taxiway Echo Rehabilitation Rev 3/2023 Project No: 26122 00 74 00 SPECIAL CONDITIONS FOR FEDERAL AVIATION ADMINISTRATION ARTICLE 1—GENERAL 1.01 FUNDING AGENCY REQUIREMENTS A. This Project is funded in whole or in part by Federal Aviation Administration (Funding Agency). The Funding Agency requires specific conditions and reporting as a condition for providing this funding. The conditions and reporting forms of the Funding Agency are included in the Contract Documents. The Funding Agency requirements govern in the event of any conflict between the Funding Agency requirements and any other provision of the Contract Documents. B. The applicable Funding Agency conditions and reporting forms are as follows: Specification Title Funding Agency Section Document No. 00 74 01 General Provisions AC 150/5370-10H Contract Provisions for 00 74 02 Supplemental Provisions Obligated Sponsors and Airport Improvement Projects END OF SECTION Special Conditions for Federal Aviation Administration 00 74 00- 1 CCIA Taxiway Echo Rehabilitation Rev 10/2018 Project No: 26122 PAGE INTENTIONALLY LEFT BLANK Special Conditions for Federal Aviation Administration 00 74 00-2 CCIA Taxiway Echo Rehabilitation Rev 10/2018 Project No: 26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 00 74 01 GENERAL PROVISIONS SECTION 10 DEFINITION OF TERMS When the following terms are used in these specifications, in the contract, or in any documents or other instruments pertaining to construction where these specifications govern, the intent and meaning shall be defined as follows: Paragraph Term Definition Number 10-01 AASHTO The American Association of State Highway and Transportation Officials. 10-02 Access Road The right-of-way, the roadway and all improvements constructed thereon connecting the airport to a public roadwa . 10-03 Advertisement A public announcement, as required by local law, inviting bids for work to be performed and materials to be furnished. 10-03.01 Agreement The written instrument, executed by Owner and Contractor, that sets forth the Contract Price and Contract Times, identifies the parties and the Engineer, and designates the specific items that are Contract Documents. See also "Contract." 10-04 Airport Airport means an area of land or water which is used or intended to be used for the landing and takeoff of aircraft; an appurtenant area used or intended to be used for airport buildings or other airport facilities or rights of way; airport buildings and facilities located in any of these areas, and a heliport. 10-05 Airport Improvement A grant-in-aid program,administered by the Federal Aviation Program (AIP) Administration (FAA). 10-06 Air Operations Area The term air operations area (AOA) shall mean any area of (AOA) the airport used or intended to be used for the landing, takeoff, or surface maneuvering of aircraft. An air operation area shall include such paved or unpaved areas that are used or intended to be used for the unobstructed movement of aircraft in addition to its associated runway, taxiway, or apron. 10-07 Apron Area where aircraft are parked, unloaded or loaded, fueled and/or serviced. 10-08 ASTM International Formerly known as the American Society for Testing and ASTM Materials ASTM . 10-09 Award The Owner's notice to the successful bidder of the acceptance of the submitted bid. 10-09.01 Bid The written offer of the Bidder (when submitted on the approved proposal form) to perform the contemplated work and furnish the necessary materials in accordance with the General Provisions 00 74 01- 1 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 Paragraph Term Definition Number provisions of the plans and specifications. See also "Proposal." 10-10 Bidder Any individual, partnership, firm, or corporation, acting directly or through a duly authorized representative, who submits a proposal for the work contemplated. 10-10.01 Bidding Documents The Bidding Requirements, the proposed Contract Documents, and all Addenda. 10-11 Building Area An area on the airport to be used, considered, or intended to be used for airport buildings or other airport facilities or rights-of-way together with all airport buildings and facilities located thereon. 10-12 Calendar Day Every day shown on the calendar. 10-13 Certificate of Analysis The COA is the manufacturer's Certificate of Compliance (COA) (COC) including all applicable test results required by the specific tions. 10-14 Certificate of The manufacturer's certification stating that materials or Compliance (COC) assemblies furnished fully comply with the requirements of the contract. The certificate shall be signed by the manufacturer's authorized representative. 10-15 Change Order A written order to the Contractor covering changes in the plans, specifications, or proposal quantities and establishing the basis of payment and contract time adjustment, if any, for work within the scope of the contract and necessary to complete the project. 10-16 Contract A written agreement between the Owner and the Contractor that establishes the obligations of the parties including but not limited to performance of work, furnishing of labor, equipment and materials and the basis of payment. The awarded Contract includes but may not be limited to: Advertisement, Contract form, Proposal, Performance bond, Payment bond, General provisions, certifications and representations, Technical Specifications, Plans, Supplemental Provisions, standards incorporated by reference and issued addenda. See also "Agreement." 10-17 Contract Item (Pay Item) A specific unit of work for which a price is provided in the contract. 10-18 Contract Time The number of calendar days or working days, stated in the proposal, allowed for completion of the contract, including authorized time extensions. If a calendar date of completion is stated in the proposal, in lieu of a number of calendar or working days, the contract shall be completed by that date. 10-19 Contractor The individual, partnership, firm, or corporation primarily liable for the acceptable performance of the work contracted and for the payment of all legal debts pertaining to the work General Provisions 00 74 01-2 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 Paragraph Term Definition Number who acts directly or through lawful agents or employees to complete the contract work. 10-20 Contractors Quality The Contractor's QC facilities in accordance with the Control QC Facilities Contractor Quality Control Program CQCP . 10-21 Contractor Quality Details the methods and procedures that will be taken to Control Program (CQCP) assure that all materials and completed construction required by the contract conform to contract plans, technical specifications and other requirements, whether manufactured by the Contractor, or procured from subcontractors or vendors. 10-22 Control Strip A demonstration by the Contractor that the materials, equipment, and construction processes results in a product meeting the requirements of the specification. 10-23 Construction Safety and The overall plan for safety and phasing of a construction Phasing Plan (CSPP) project developed by the airport operator, or developed by the airport operator's consultant and approved by the airport operator. It is included in the invitation for bids and becomes art of the project specifications. 10-24 Drainage System The system of pipes, ditches, and structures by which surface or subsurface waters are collected and conducted from the airport area. 10-25 Engineer The individual, partnership, firm, or corporation duly authorized by the Owner to be responsible for engineering, inspection, and/or observation of the contract work and acting directly or through an authorized representative. 10-26 Equipment All machinery, together with the necessary supplies for upkeep and maintenance; and all tools and apparatus necessary for the proper construction and acceptable completion of the work. 10-27 Extra Work An item of work not provided for in the awarded contract as previously modified by change order or supplemental agreement, but which is found by the Owner's Engineer or Resident Project Representative (RPR) to be necessary to complete the work within the intended scope of the contract as previously modified. 10-28 FAA The Federal Aviation Administration. When used to designate a person, FAA shall mean the Administrator or their duly authorized representative. 10-29 Federal Specifications The federal specifications and standards, commercial item descriptions, and supplements, amendments, and indices prepared and issued by the General Services Administration. General Provisions 00 74 01-3 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 Paragraph Term Definition Number 10-30 Force Account a. Contract Force Account - A method of payment that addresses extra work performed by the Contractor on a time and material basis. b. Owner Force Account-Work performed for the project by the Owner's employees. 10-30.01 Hazardous The presence at the Site of Constituents of Concern in such Environmental quantities or circumstances that may present a danger to Condition persons or property exposed thereto. The presence at the Site of materials that are necessary for the execution of the Work, or that are to be incorporated in the Work, and that are controlled and contained pursuant to industry practices, Laws and Regulations, and the requirements of the Contract, does not establish a Hazardous Environmental Condition. 10-31 Intention of Terms Whenever, in these specifications or on the plans,the words "directed," "required," "permitted," "ordered," "designated," "prescribed," or words of like import are used, it shall be understood that the direction, requirement, permission, order, designation, or prescription of the Engineer and/or Resident Project Representative (RPR) is intended; and similarly, the words "approved," "acceptable," "satisfactory," or words of like import, shall mean approved by, or acceptable to, or satisfactory to the Engineer and/or RPR, subject in each case to the final determination of the Owner. Any reference to a specific requirement of a numbered paragraph of the contract specifications or a cited standard shall be interpreted to include all general requirements of the entire section, specification item, or cited standard that may be pertinent to such specific reference. 10-32 Lighting A system of fixtures providing or controlling the light sources used on or near the airport or within the airport buildings. The field lighting includes all luminous signals, markers, floodlights, and illuminating devices used on or near the airport or to aid in the operation of aircraft landing at, taking off from, or taxiing on the airport surface. 10-33 Major and Minor A major contract item shall be any item that is listed in the Contract Items proposal, the total cost of which is equal to or greater than 20%of the total amount of the award contract.All other items shall be considered minor contract items. 10-34 Materials Any substance specified for use in the construction of the contract work. 10-35 Modification of Any deviation from standard specifications applicable to Standards (MOS) material and construction methods in accordance with FAA Order 5300.1. 10-36 Notice to Proceed (NTP) A written notice to the Contractor to begin the actual contract work on a previously agreed to date. If applicable,the Notice General Provisions 00 74 01-4 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 Paragraph Term Definition Number to Proceed shall state the date on which the contract time begins. 10-37 Owner The term "Owner"shall mean the party of the first part or the contracting agency signatory to the contract. Where the term "Owner" is capitalized in this document, it shall mean airport Sponsor only. The Owner for this project is City of Corpus Christi, Texas. 10-38 Passenger Facility Per 14 Code of Federal Regulations (CFR) Part 158 and 49 Charge (PFC) United States Code (USC) § 40117, a PFC is a charge imposed by a public agency on passengers enplaned at a commercial service airport it controls. 10-39 Pavement Structure The combined surface course, base course(s), and subbase courses , if any, considered as a single unit. 10-40 Payment bond The approved form of security furnished by the Contractor and their own surety as a guaranty that the Contractor will pay in full all bills and accounts for materials and labor used in the construction of the work. 10-41 Performance bond The approved form of security furnished by the Contractor and their own surety as a guaranty that the Contractor will complete the work in accordance with the terms of the contract. 10-42 Plans The official drawings or exact reproductions which show the location, character, dimensions and details of the airport and the work to be done and which are to be considered as a part of the Contract, supplementary to the specifications. Plans may also be referred to as "contract drawings," or "drawings." 10-43 Project The agreed scope of work for accomplishing specific airport development with respect to a particular airport. 10-44 Proposal The written offer of the Bidder (when submitted on the approved proposal form) to perform the contemplated work and furnish the necessary materials in accordance with the provisions of the plans and specifications. See also "Bid." 10-45 Proposal guaranty The security furnished with a proposal to guarantee that the bidder will enter into a contract if their own proposal is accepted by the Owner. 10-46 Quality Assurance (QA) Owner's responsibility to assure that construction work com leted complies with specifications for payment. 10-47 Quality Control (QC) Contractor's responsibility to control material(s) and construction processes to complete construction in accordance with project specifications. 10-48 Quality Assurance (QA) An authorized representative of the Engineer and/or Inspector Resident Project Representative (RPR) assigned to make all necessary inspections, observations, tests, and/or General Provisions 00 74 01-5 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 Paragraph Term Definition Number observation of tests of the work performed or being performed, or of the materials furnished or being furnished by the Contractor. 10-49 Quality Assurance (QA) The official quality assurance testing laboratories of the Laboratory Owner or such other laboratories as may be designated by the Engineer or RPR. May also be referred to as Engineer's, Owner's, or QA Laboratory. 10-50 Resident Project The individual, partnership, firm, or corporation duly Representative (RPR) authorized by the Owner to be responsible for all necessary inspections, observations, tests, and/or observations of tests of the contract work performed or being performed, or of the materials furnished or being furnished by the Contractor, and acting directly or through an authorized representative. 10-51 Runway The area on the airport prepared for the landing and takeoff of aircraft. 10-52 Runway Safety Area A defined surface surrounding the runway prepared or (RSA) suitable for reducing the risk of damage to aircraft. See the construction safety and phasing plan (CSPP)for limits of the RSA. 10-53 Safety Plan Compliance Details how the Contractor will comply with the CSPP. Document SPCD 10-54 Specifications A part of the contract containing the written directions and requirements for completing the contract work. Standards for specifying materials or testing which are cited in the contract specifications by reference shall have the same force and effect as if included in the contract physically. 10-54.01 Site Has the meaning set forth in Section 4.01 of the Instructions to Bidders. 10-55 Sponsor A Sponsor is defined in 49 USC § 47102(24) as a public agency that submits to the FAA for an AI P grant; or a private Owner of a public-use airport that submits to the FAA an application for an AIP grant for the airport. 10-56 Structures Airport facilities such as bridges; culverts; catch basins, inlets, retaining walls, cribbing; storm and sanitary sewer lines; water lines; underdrains; electrical ducts, manholes, handholes, lighting fixtures and bases; transformers; navigational aids; buildings; vaults; and, other manmade features of the airport that may be encountered in the work and not otherwise classified herein. 10-57 Sub grade The soil that forms the pavement foundation. 10-58 Superintendent The Contractor's executive representative who is present on the work during progress, authorized to receive and fulfill instructions from the RPR, and who shall supervise and direct the construction. General Provisions 00 74 01-6 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 Paragraph Term Definition Number 10-59 Supplemental A written agreement between the Contractor and the Owner Agreement that establishes the basis of payment and contract time adjustment, if any,for the work affected by the supplemental agreement. A supplemental agreement is required if: (1) in scope work would increase or decrease the total amount of the awarded contract by more than 25%: (2) in scope work would increase or decrease the total of any major contract item by more than 25%; (3)work that is not within the scope of the originally awarded contract; or (4) adding or deleting of a major contract item. 10-60 Surety The corporation, partnership, or individual, other than the Contractor, executing payment or performance bonds that are furnished to the Owner by the Contractor. 10-61 Taxilane A taxiway designed for low speed movement of aircraft between aircraft parking areas and terminal areas. 10-62 Taxiway The portion of the air operations area of an airport that has been designated by competent airport authority for movement of aircraft to and from the airport's runways, aircraft parking areas, and terminal areas. 10-63 Taxiway/Taxilane Safety A defined surface alongside the taxiway prepared or suitable Area (TSA) for reducing the risk of damage to an aircraft. See the construction safety and phasing plan (CSPP)for limits of the TSA. 10-63.01 Technical Data Those items expressly identified as Technical Data in the Special Provisions, with respect to either (a) subsurface conditions at the Site, or physical conditions relating to existing surface or subsurface structures at the Site (except Underground Facilities) or (b) Hazardous Environmental Conditions at the Site. If no such express identifications of Technical Data have been made with respect to conditions at the Site, then the data contained in boring logs, recorded measurements of subsurface water levels, laboratory test results, and other factual, objective information regarding conditions at the Site that are set forth in any geotechnical or environmental report prepared for the Project and made available to Contractor are hereby defined as Technical Data with respect to conditions at the Site. 10-63.02 Underground Facilities All underground pipelines, conduits, ducts, cables, wires, manholes, vaults, tanks, tunnels, or other such facilities or attachments, and any encasements containing such facilities, including but not limited to those that convey electricity, gases, steam, liquid petroleum products, telephone or other communications, fiber optic transmissions, cable television, water, wastewater, storm water, other liquids or chemicals, or traffic or other control systems. General Provisions 00 74 01-7 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 Paragraph Term Definition Number 10-64 Work The furnishing of all labor, materials, tools, equipment, and incidentals necessary or convenient to the Contractor's performance of all duties and obligations imposed by the contract, plans, and specifications. 10-65 Working day A working day shall be any day other than a legal holiday, Saturday, or Sunday on which the normal working forces of the Contractor may proceed with regular work for at least six (6) hours toward completion of the contract. When work is suspended for causes beyond the Contractor's control, it will not be counted as a working day. Saturdays, Sundays and holidays on which the Contractor's forces engage in regular work will be considered as working days. 10-66 Owner Defined terms Owner's Authorized Representative (OAR) Owner defined terms have been incorporated in alphabetical order above and are shown in italics. END OF SECTION 10 General Provisions 00 74 01-8 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 SECTION 20 PROPOSAL REQUIREMENTS AND CONDITIONS 20-01 Advertisement(Notice to Bidders). Section 1 of Request for Bid Solicitation 20-02 Qualification of bidders. See Instructions to Bidders, Section 2 of Request for Bid Solicitation.€-aeh bidder shall submit evidenGe of GernpetenGy and evidenGe of finanGial responsibility to perform the werk to the Owner at the time of hid opening. EvidenGe ef GOMpetenGy, unless etherwise speGified, shall Gensist of statements Govering the bidder's pa he work work, the fin-anrUi-al responsibility, unless otherwise speGified, shall Gensist ef a r.onfidential statement er repeFt Of the _h't-Igiper's finanGial resoUFGes and Iiabil'fip-s -;;s n-f the last Galendar year ar the bidder's laq-t fiS-Gal year. SUG14 statements er reports sh-11. be by a publiG aGGOuntant. At the time of submitting s---r--.h fin-anr--i-al staternents or reports, the bid-d-er sh;;Il further Gertify whether their finanGial responsibility is approximately the -hodd-er Shall qualify the publiG aG A-u-Int-Ant's statement er repert te ref!eGt the bidder's true finaanrcial Unless otherwise speGified, a bidder may submit e,.M-enp-p-th-At they are prequalified-�.Aimth the State Highway Division and are on the GUFFeRt "bidder's Inst" A-f the state OR whiGh the proposed- �.AiA-rk ms IA-P-ated. EvidenG6 Gf State Highway DiViSiOR prequalifiGatiGR may be submitted as evideRGe Gf fiRanGial responsibility iR lieu of the mortified statemeRtS or reperts o reified abE)vo 20-03 Contents of proposal forms. The Owner's bidding documents proposal fermo state the location and description of the proposed construction; the place, date, and time of opening of the proposals; and the estimated quantities of the various items of work to be performed and materials to be furnished for which unit bid prices are asked. The proposal form states the time in which the work must be completed, and the amount of the proposal guaranty that must accompany the proposal. The Owner will accept only those Proposals properly executed on physical forms or electronic forms provided by the Owner. Bidder actions that may cause the Owner to deem a proposal irregular are given in paragraph 20-09 Irregular proposals. Mobilization is limited to 5 percent of the total project cost. A prebid conference is required on this project to discuss as a minimum, the following items: material requirements; submittals; Quality Control/Quality Assurance requirements; the construction safety and phasing plan including airport access and staging areas; and unique airfield paving construction requirements. See Section 2 of Request for Bid Solicitation. 20-04 Issuance of proposal forms. The Owner reserves the right to refuse to issue a proposal form to a prospective bidder if the bidder is in default for any of the following reasons: a. Failure to comply with any prequalification regulations of the Owner, if such regulations are cited, or otherwise included, in the proposal as a requirement for bidding. b. Failure to pay, or satisfactorily settle, all bills due for labor and materials on former contracts in force with the Owner at the time the Owner issues the proposal to a prospective bidder. c. Documented record of Contractor default under previous contracts with the Owner. d. Documented record of unsatisfactory work on previous contracts with the Owner. 20-05 Interpretation of estimated proposal quantities. An estimate of quantities of work to be done and materials to be furnished under these specifications is given in the proposal. It is the result of careful calculations and is believed to be correct. It is given only as a basis for comparison of proposals and the award of the contract. The Owner does not expressly, or by implication, agree that the actual quantities involved will correspond exactly therewith; nor shall the bidder plead misunderstanding or deception General Provisions 00 74 01-9 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 because of such estimates of quantities, or of the character, location, or other conditions pertaining to the work. Payment to the Contractor will be made only for the actual quantities of work performed or materials furnished in accordance with the plans and specifications. It is understood that the quantities may be increased or decreased as provided in the Section 40, paragraph 40-02, Alteration of Work and Quantities, without in any way invalidating the unit bid prices. 20-06 Examination of plans, specifications, and site. The bidder is expected to carefully examine the site of the proposed work, the proposal, plans, specifications, and contract forms. Bidders shall satisfy themselves to the character, quality, and quantities of work to be performed, materials to be furnished, and to the requirements of the proposed contract. The submission of a proposal shall be prima facie evidence that the bidder has made such examination and is satisfied to the conditions to be encountered in performing the work and the requirements of the proposed contract, plans, and specifications. Boring logs and other records of subsurface investigations and tests are available for inspection of bidders. It is understood and agreed that such subsurface information,whether included in the plans, specifications, or otherwise made available to the bidder, was obtained and is intended for the Owner's design and estimating purposes only. Such information has been made available for the convenience of all bidders. It is further understood and agreed that each bidder is solely responsible for all assumptions, deductions, or conclusions which the bidder may make or obtain from their own examination of the boring logs and other records of subsurface investigations and tests that are furnished by the Owner. 20-07 Preparation of proposal. See Instructions to Bidders, Section 2 of Request for Bid Solicitation. The bidder shall submit their proposal on the forms furnished by the Owner. All blank spaGes on the proposal fGFMS, HRIess expliGitly stated otherwise, must be GGrreGtIY filled iR where indiGated fer eaGh and every item fer whiGh a quaRtity is giVeR. ff so r-equestee� the bidder shall state the PFiG8 (writteR iR iRk or typed) both On The bidder shall GOrreGtly sign the prepe-s-A On Onk. If the proposal is made by aR iRdividual, their name and Pest G#iGe address must -hp- s;hA-�.A.M. If made by a paFtRership, the name and pest effiGe address of eaGh member ef the paFtRership must be shA-I.A.M. If Made by a GOrporation, the peFSGR SigRing the preposal shall give the narne of the RtAtP Where the Aerperation was; r-hArhzriQd ARd the Rame, titles, and business address ef the president, seGretary, and the treasurer. Anyone signing a proposal as an agent shall file evidenpe e their ai theerity to do so and that the signature is binding i pen the firm Or rernera+inn. 20-08 Responsive and responsible bidder. See Instructions to Bidders, Section 2 of Request for Bid Solicitation. for hod It the Owner's responsibility to if the eXGeptiGRS taken by a -- — boddpr to the eliGitatien a material e net and the extent of dey'atien it is filling tea en+ A respensible bidder has the ability te perform suGGessfully under the terms and Genditiens ef a prepesed preGurement, as defined On 2 GFR § 200.318(h). This inGludes SUGh matters as GentraGter integrity, 20-09 Irregular proposals. Proposals shall be considered irregular for the following reasons: a. If the proposal is on a form other than that furnished by the Owner, or if the Owner's form is altered, or if any part of the proposal form is detached. b. If there are unauthorized additions, conditional or alternate pay items, or irregularities of any kind that make the proposal incomplete, indefinite, or otherwise ambiguous. c. If the proposal does not contain a unit price for each pay item listed in the proposal, except in the case of authorized alternate pay items, for which the bidder is not required to furnish a unit price. d. If the proposal contains unit prices that are obviously unbalanced. e. If the proposal is not accompanied by the proposal guaranty specified by the Owner. f. If the applicable Disadvantaged Business Enterprise information is incomplete. General Provisions 00 74 01- 10 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 The Owner reserves the right to reject any irregular proposal and the right to waive technicalities if such waiver is in the best interest of the Owner and conforms to local laws and ordinances pertaining to the letting of construction contracts. 20-10 Bid guarantee. See Instructions to Bidders, Section 2 of Request for Bid Solicitation. EaGh separate thia Owner. 20-11 Delivery of proposal. See Instructions to Bidders, Sectoin 2 of Request for Bid Solicitation. 20-12 Withdrawal or revision of proposals. See Conditions of Governing the Procurement, Section 3 of RequestforBid Solicitation. A bidder may�niithdraw or revise(by withdrawal of one prepesal anrd si,hmiGGion iting by fax ][ by email ] befere the tirne S-PeGified fer epening bids. Revised prep 20-13 Public opening of proposals. See Conditions of Governing the Procurement, Section 3 of Request for Bid Solicitation. Prepesais shavll*l be epened, and read, publliGly at the time and nlaGe ono^ified in the advertisernent. Bidders, their a4uthelrozed agents, -and- A-their interested persens -Ars invited te attend Prepesals that h-Ave been withdrawn (by written er telegraphiG request) er r8G8iVP-G1 after the tome SpeGified fer opening hirls Ghall he retUrnerd to the bidder unopened. 20-14 Disqualification of bidders. See Conditions of Governing the Procurement, Section 3 of Request for Bid Solicitation. A.hirlrler Ghall he ^ sidered disqualified aRY of the fellewina Peas , firm, OF GOrperatien URder the same er differeRt nb. Ev'denGe Of GO"usion arneng bidders. Bidders partidpating on SUGh GO"usion shall be disqualified as bidders for aRY future werk of the QWRer unto! aRY SUGh paFtiGipatiRg bidder has been reiRstated by the Owner as a qualified bidder. lssuanGe of Proposal Corms of this Gentian ' 20-15 Discrepancies and Omissions. See Conditions of Governing the Procurement, Section 3 of Request for Bid Solicitation. n Bidder whe d,ssovers dssGrepenGieG riss ?=With the pr^ieGt bid dGG61meRts shall immediately netify the Qv.MP—r's Engineer of the matter. A bidder that has deubt as te the true meaRing ef a prejeGt requirement may subrn't tn- the Owner's Eng'Reer a written request for 0nterpretation„o later tlaR [_] days.i I I i I epen+ng Any'RterpretatmOR of the projeGt bid deGumeRts by the&.ynp—r's FEngineer will be by written addeRdum issued rdeGUmentG in any manRer ether than written addend um END OF SECTION 20 General Provisions 00 74 01- 11 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY LEFT BLANK General Provisions 00 74 01- 12 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 SECTION 30 AWARD AND EXECUTION OF CONTRACT 30-01 Consideration of proposals. See Conditions of Governing the Procurement, Section 3 of Request for Bid Solicitation. After the prepesals are publidy epened and read, they will be c-empared OR the bas's e the summatiGR of the predUGtS ebtaiRed by rnultiplyiRg the estimated quaRtit.es shGWR OR the proposal by the unit bid PF'Ges. if a bidder's prepes-A r--e-Rtains; a diSGrepaRGY betweeR unit bid PFiGes written On werds Until thp WAGrd AfA GGAtraGt iS made, the ()WnPr reserves the right to rejeGt a bidder's proposal fer aRY of the fOlIGA ing r0000no• b. If the bidder is disqualified for any ef the reasons speGified SeGtiGn a. If. t-he proposal is irregular as sper-,ified On Ser--tion 20, paragraph 20 09, Irregular Propesa�s.paragraph 20 Di qualifination of Riddora ' in addition, unto! the award of a r_-.A_.ntrar_-.t is made,the C_-)�.Ainpr rp,;Ppfes the right to rejeGt aRy or all proposals, waive teGhR'Galotmes, if suGh waiver is in the best'Rterest ef the Owner A.n.d iis, ii.n. vvith appliGable 30-02 Award of contract. See Conditions of Governing the Procurement, Section 3 of Request for Bid Solicitation. The award of a GontraGt, if Ot is to be awarded, shall be made within Galendar days of the date speGified for publid, . . - . posals, unless otherwise speGified herein-. if the Owner e!eGts to proGeed with an award of GontraGt, the Owner will make award to the responsible bidder whose bod, Gonforming with all the material terms and Gonditions of the bid doGurnents, is the lowest 30-03 Cancellation of award. The Owner reserves the right to cancel the award without liability to the bidder, except return of proposal guaranty, at any time before a contract has been fully executed by all parties and is approved by the Owner in accordance with paragraph 30-07 Approval of Contract. 30-04 Return of proposal guaranty. See Conditions of Governing the Procurement, Section 3 of Request for Bid Solicitation. All prepesalg;aranties except those P_f tho- le-west bidders, will be roturnor! rnmediately after the Qwnpr hAi; made a GOmparison of bids as speGified on the paragraph 30 01, G__P_P8id_eA_;;t10_n of P4!opesals. Propesal guaranties oft,h,ta b,A"fn In,,A,fest bidders will be retained by the Owner URN 66IGh time as an award is made, at ofh'r.h torne, the 6MGLIGGessful _h'ididp-r's prepesal guar returned. The sur--r--essfi-11 bidder's prepesal guaranty will be returned as seen as the Q�.AVAPW reGeives the nnntron# bends as onooified in paragraph 30 05 Requirements of r/lrlt arGt Rondo 30-05 Requirements of contract bonds.At the time of the execution of the contract,the successful bidder shall furnish the Owner a surety bond or bonds that have been fully executed by the bidder and the surety guaranteeing the performance of the work and the payment of all legal debts that may be incurred by reason of the Contractor's performance of the work. The surety and the form of the bond or bonds shall be acceptable to the Owner. Unless otherwise specified in this subsection, the surety bond or bonds shall be in a sum equal to the full amount of the contract. 30-06 Execution of contract. See Conditions of Governing the Procurement, Section 3 of Request for Bid Solicitation. The SUGGeSSfUl bidder shall sign (exeGute) the neGessary agreements for entering into the centraet and Fetffn the signed centra6t to the Owner, along with the fully executed SUFety bond OF bonds specified in paragFaph 30 06, Requirements of Gentraet Bonds of this within 16 calendar days from the date mailed o otherwise .delivered to the successful hi.d section,d.,r 30-07 Approval of contract. See Conditions of Governing the Procurement, Section 3 of Request for Bid Solicitation. Upon receipt of the contraet and contract bond or bonds that have been executed by the General Provisions 00 74 01- 13 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 .,f the .ORtraGt 30-08 Failure to execute contract. See Conditions of Governing the Procurement, Section 3 of Request for Bid Solicitation. liquidated darnages to the Owner. END OF SECTION 30 General Provisions 00 74 01- 14 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 SECTION 40 SCOPE OF WORK 40-01 Intent of contract. The intent of the contract is to provide for construction and completion, in every detail, of the work described. It is further intended that the Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the contract. 40-02 Alteration of work and quantities.The Owner reserves the right to make such changes in quantities and work as may be necessary or desirable to complete, in a satisfactory manner, the original intended work. Unless otherwise specified in the Contract, the Owner's Engineer or RPR shall be and is hereby authorized to make, in writing, such in-scope alterations in the work and variation of quantities as may be necessary to complete the work, provided such action does not represent a significant change in the character of the work. For purpose of this section, a significant change in character of work means: any change that is outside the current contract scope of work; any change (increase or decrease) in the total contract cost by more than 25%; or any change in the total cost of a major contract item by more than 25%. Work alterations and quantity variances that do not meet the definition of significant change in character of work shall not invalidate the contract nor release the surety. Contractor agrees to accept payment for such work alterations and quantity variances in accordance with Section 90, paragraph 90-03, Compensation for Altered Quantities. Should the value of altered work or quantity variance meet the criteria for significant change in character of work, such altered work and quantity variance shall be covered by a supplemental agreement. Supplemental agreements shall also require consent of the Contractor's surety and separate performance and payment bonds. If the Owner and the Contractor are unable to agree on a unit adjustment for any contract item that requires a supplemental agreement, the Owner reserves the right to terminate the contract with respect to the item and make other arrangements for its completion. 40-03 Omitted items. The Owner, the Owner's Engineer or the RPR may provide written notice to the Contractor to omit from the work any contract item that does not meet the definition of major contract item. Major contract items may be omitted by a supplemental agreement. Such omission of contract items shall not invalidate any other contract provision or requirement. Should a contract item be omitted or otherwise ordered to be non-performed, the Contractor shall be paid for all work performed toward completion of such item prior to the date of the order to omit such item. Payment for work performed shall be in accordance with Section 90, paragraph 90-04, Payment for Omitted Items. 40-04 Extra work. Should acceptable completion of the contract require the Contractor to perform an item of work not provided for in the awarded contract as previously modified by change order or supplemental agreement, Owner may issue a Change Order to cover the necessary extra work. Change orders for extra work shall contain agreed unit prices for performing the change order work in accordance with the requirements specified in the order, and shall contain any adjustment to the contract time that, in the RPR's opinion, is necessary for completion of the extra work. When determined by the RPR to be in the Owner's best interest, the RPR may order the Contractor to proceed with extra work as provided in Section 90, paragraph 90-05, Payment for Extra Work. Extra work that is necessary for acceptable completion of the project, but is not within the general scope of the work covered by the original contract shall be covered by a supplemental agreement as defined in Section 10, paragraph 10-59, Supplemental Agreement. If extra work is essential to maintaining the project critical path, RPR may order the Contractor to commence the extra work under a Time and Material contract method. Once sufficient detail is available to establish the level of effort necessary for the extra work, the Owner shall initiate a change order or supplemental agreement to cover the extra work. General Provisions 00 74 01- 15 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 Any claim for payment of extra work that is not covered by written agreement(change order or supplemental agreement)shall be rejected by the Owner. 40-05 Maintenance of traffic. It is the explicit intention of the contract that the safety of aircraft, as well as the Contractor's equipment and personnel, is the most important consideration. The Contractor shall maintain traffic in the manner detailed in the Construction Safety and Phasing Plan (CSPP). a. It is understood and agreed that the Contractor shall provide for the free and unobstructed movement of aircraft in the air operations areas (AOAs) of the airport with respect to their own operations and the operations of all subcontractors as specified in Section 80, paragraph 80-04, Limitation of Operations. It is further understood and agreed that the Contractor shall provide for the uninterrupted operation of visual and electronic signals (including power supplies thereto) used in the guidance of aircraft while operating to, from,and upon the airport as specified in Section 70, paragraph 70-15, Contractor's Responsibility for Utility Service and Facilities of Others. b. With respect to their own operations and the operations of all subcontractors, the Contractor shall provide marking, lighting, and other acceptable means of identifying personnel, equipment, vehicles, storage areas,and any work area or condition that may be hazardous to the operation of aircraft,fire-rescue equipment, or maintenance vehicles at the airport in accordance with the construction safety and phasing plan (CSPP) and the safety plan compliance document (SPCD). c. When the contract requires the maintenance of an existing road, street, or highway during the Contractor's performance of work that is otherwise provided for in the contract, plans, and specifications, the Contractor shall keep the road, street, or highway open to all traffic and shall provide maintenance as may be required to accommodate traffic. The Contractor, at their expense, shall be responsible for the repair to equal or better than preconstruction conditions of any damage caused by the Contractor's equipment and personnel. The Contractor shall furnish, erect, and maintain barricades,warning signs, flag person,and other traffic control devices in reasonable conformity with the Manual on Uniform Traffic Control Devices (MUTCD) (http://mutcd.fhwa.dot.gov/), unless otherwise specified. The Contractor shall also construct and maintain in a safe condition any temporary connections necessary for ingress to and egress from abutting property or intersecting roads, streets or highways. 40-06 Removal of existing structures. All existing structures encountered within the established lines, grades, or grading sections shall be removed by the Contractor, unless such existing structures are otherwise specified to be relocated, adjusted up or down,salvaged,abandoned in place, reused in the work or to remain in place. The cost of removing such existing structures shall not be measured or paid for directly, but shall be included in the various contract items. Should the Contractor encounter an existing structure (above or below ground) in the work for which the disposition is not indicated on the plans, the Resident Project Representative (RPR) shall be notified prior to disturbing such structure. The disposition of existing structures so encountered shall be immediately determined by the RPR in accordance with the provisions of the contract. Except as provided in Section 40, paragraph 40-07, Rights in and Use of Materials Found in the Work, it is intended that all existing materials or structures that may be encountered (within the lines, grades, or grading sections established for completion of the work) shall be used in the work as otherwise provided for in the contract and shall remain the property of the Owner when so used in the work. 40-07 Rights in and use of materials found in the work. Should the Contractor encounter any material such as (but not restricted to) sand, stone, gravel, slag, or concrete slabs within the established lines, grades, or grading sections, the use of which is intended by the terms of the contract to be embankment, the Contractor may at their own option either: a. Use such material in another contract item, providing such use is approved by the RPR and is in conformance with the contract specifications applicable to such use; or, b. Remove such material from the site, upon written approval of the RPR; or c. Use such material for the Contractor's own temporary construction on site; or, General Provisions 00 74 01- 16 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 d. Use such material as intended by the terms of the contract. Should the Contractor wish to exercise option a., b., or c., the Contractor shall request the RPR's approval in advance of such use. Should the RPR approve the Contractor's request to exercise option a., b., or c., the Contractor shall be paid for the excavation or removal of such material at the applicable contract price. The Contractor shall replace, at their expense, such removed or excavated material with an agreed equal volume of material that is acceptable for use in constructing embankment, backfills, or otherwise to the extent that such replacement material is needed to complete the contract work.The Contractor shall not be charged for use of such material used in the work or removed from the site. Should the RPR approve the Contractor's exercise of option a., the Contractor shall be paid, at the applicable contract price, for furnishing and installing such material in accordance with requirements of the contract item in which the material is used. It is understood and agreed that the Contractor shall make no claim for delays by reason of their own exercise of option a., b., or c. The Contractor shall not excavate, remove,or otherwise disturb any material, structure,or part of a structure which is located outside the lines, grades, or grading sections established for the work, except where such excavation or removal is provided for in the contract, plans, or specifications. 40-08 Final cleanup. Upon completion of the work and before acceptance and final payment will be made, the Contractor shall remove from the site all machinery, equipment, surplus and discarded materials, rubbish,temporary structures,and stumps or portions of trees.The Contractor shall cut all brush and woods within the limits indicated and shall leave the site in a neat and presentable condition. Material cleared from the site and deposited on adjacent property will not be considered as having been disposed of satisfactorily, unless the Contractor has obtained the written permission of the property Owner. END OF SECTION 40 General Provisions 00 74 01- 17 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY LEFT BLANK General Provisions 00 74 01- 18 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 SECTION 50 CONTROL OF WORK 50-01 Authority of the Resident Project Representative (RPR). The RPR has final authority regarding the interpretation of project specification requirements. The RPR shall determine acceptability of the quality of materials furnished, method of performance of work performed, and the manner and rate of performance of the work. The RPR does not have the authority to accept work that does not conform to specification requirements. 50-02 Conformity with plans and specifications. All work and all materials furnished shall be in reasonably close conformity with the lines, grades, grading sections, cross-sections, dimensions, material requirements, and testing requirements that are specified (including specified tolerances) in the contract, plans, or specifications. If the RPR finds the materials furnished,work performed,or the finished product not within reasonably close conformity with the plans and specifications, but that the portion of the work affected will, in their opinion, result in a finished product having a level of safety, economy, durability, and workmanship acceptable to the Owner, the RPR will advise the Owner of their determination that the affected work be accepted and remain in place. The RPR will document the determination and recommend to the Owner a basis of acceptance that will provide for an adjustment in the contract price for the affected portion of the work. Changes in the contract price must be covered by contract change order or supplemental agreement as applicable. If the RPR finds the materials furnished, work performed,or the finished product are not in reasonably close conformity with the plans and specifications and have resulted in an unacceptable finished product, the affected work or materials shall be removed and replaced or otherwise corrected by and at the expense of the Contractor in accordance with the RPR's written orders. The term "reasonably close conformity" shall not be construed as waiving the Contractor's responsibility to complete the work in accordance with the contract, plans, and specifications. The term shall not be construed as waiving the RPR's responsibility to insist on strict compliance with the requirements of the contract, plans, and specifications during the Contractor's execution of the work, when, in the RPR's opinion, such compliance is essential to provide an acceptable finished portion of the work. The term "reasonably close conformity" is also intended to provide the RPR with the authority, after consultation with the Sponsor and FAA, to use sound engineering judgment in their determinations to accept work that is not in strict conformity, but will provide a finished product equal to or better than that required by the requirements of the contract, plans and specifications. The RPR will not be responsible for the Contractor's means, methods, techniques, sequences, or procedures of construction or the safety precautions incident thereto. 50-03 Coordination of contract, plans, and specifications. The contract, plans, specifications, and all referenced standards cited are essential parts of the contract requirements. If electronic files are provided and used on the project and there is a conflict between the electronic files and hard copy plans, the hard copy plans shall govern. A requirement occurring in one is as binding as though occurring in all. They are intended to be complementary and to describe and provide for a complete work. In case of discrepancy, calculated dimensions will govern over scaled dimensions; contract technical specifications shall govern over contract general provisions, plans, cited standards for materials or testing, and cited advisory circulars (ACs); contract general provisions shall govern over plans, cited standards for materials or testing, and cited ACs; plans shall govern over cited standards for materials or testing and cited ACs. If any paragraphs contained in the Special Provisions conflict with General Provisions or Technical Specifications,the Special Provisions shall govern. From time to time, discrepancies within cited testing standards occur due to the timing of the change, edits, and/or replacement of the standards. If the Contractor discovers any apparent discrepancy within standard test methods, the Contractor shall immediately ask the RPR for an interpretation and decision, and such decision shall be final. General Provisions 00 74 01- 19 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 The Contractor shall not take advantage of any apparent error or omission on the plans or specifications. In the event the Contractor discovers any apparent error or discrepancy, Contractor shall immediately notify the Owner or the designated representative in writing requesting their written interpretation and decision. 50-04 List of Special Provisions. See Special Provisions (Section 00 74 02) 50-05 Cooperation of Contractor. The Contractor shall be supplied with two hard copies or an electronic PDF of the plans and specifications.The Contractor shall have available on the construction site at all times one hardcopy each of the plans and specifications. Additional hard copies of plans and specifications may be obtained by the Contractor for the cost of reproduction. The Contractor shall give constant attention to the work to facilitate the progress thereof, and shall cooperate with the RPR and their inspectors and with other Contractors in every way possible. The Contractor shall have a competent superintendent on the work at all times who is fully authorized as their agent on the work. The superintendent shall be capable of reading and thoroughly understanding the plans and specifications and shall receive and fulfill instructions from the RPR or their authorized representative. 50-06 Cooperation between Contractors. The Owner reserves the right to contract for and perform other or additional work on or near the work covered by this contract. When separate contracts are let within the limits of any one project, each Contractor shall conduct the work not to interfere with or hinder the progress of completion of the work being performed by other Contractors. Contractors working on the same project shall cooperate with each other as directed. Each Contractor involved shall assume all liability, financial or otherwise, in connection with their own contract and shall protect and hold harmless the Owner from any and all damages or claims that may arise because of inconvenience, delays, or loss experienced because of the presence and operations of other Contractors working within the limits of the same project. The Contractor shall arrange their work and shall place and dispose of the materials being used to not interfere with the operations of the other Contractors within the limits of the same project. The Contractor shall join their work with that of the others in an acceptable manner and shall perform it in proper sequence to that of the others. 50-07 Construction layout and stakes. The Engineer/RPR shall establish necessary horizontal and vertical control. The establishment of Survey Control and/or reestablishment of survey control shall be by a State Licensed Land Surveyor. Contractor is responsible for preserving integrity of horizontal and vertical controls established by Engineer/RPR. In case of negligence on the part of the Contractor or their employees, resulting in the destruction of any horizontal and vertical control, the resulting costs will be deducted as a liquidated damage against the Contractor. Prior to the start of construction, the Contractor will check all control points for horizontal and vertical accuracy and certify in writing to the RPR that the Contractor concurs with survey control established for the project. All lines, grades and measurements from control points necessary for the proper execution and control of the work on this project will be provided to the RPR. The Contractor is responsible to establish all layout required for the construction of the project. Copies of survey notes will be provided to the RPR for each area of construction and for each placement of material as specified to allow the RPR to make periodic checks for conformance with plan grades, alignments and grade tolerances required by the applicable material specifications. Surveys will be provided to the RPR prior to commencing work items that cover or disturb the survey staking. Survey(s) and notes shall be provided in the following format(s): AutoCAD Civil 3D. Laser, GPS, String line, or other automatic control shall be checked with temporary control as necessary. In the case of error, on the part of the Contractor, their surveyor, employees or subcontractors, resulting in established grades, alignment or grade tolerances that do not concur with those specified or shown on the plans, the Contractor is solely responsible for correction, removal, replacement and all associated costs at no additional cost to the Owner. General Provisions 00 74 01-20 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 No direct payment will be made, unless otherwise specified in contract documents,for this labor, materials, or other expenses. The cost shall be included in the price of the bid for the various items of the Contract. 50-08 Authority and duties of Quality Assurance (QA) inspectors. QA inspectors shall be authorized to inspect all work done and all material furnished. Such QA inspection may extend to all or any part of the work and to the preparation, fabrication, or manufacture of the materials to be used. QA inspectors are not authorized to revoke, alter, or waive any provision of the contract. QA inspectors are not authorized to issue instructions contrary to the plans and specifications or to act as foreman for the Contractor. QA Inspectors are authorized to notify the Contractor or their representatives of any failure of the work or materials to conform to the requirements of the contract, plans, or specifications and to reject such nonconforming materials in question until such issues can be referred to the RPR for a decision. 50-09 Inspection of the work. All materials and each part or detail of the work shall be subject to inspection. The RPR shall be allowed access to all parts of the work and shall be furnished with such information and assistance by the Contractor as is required to make a complete and detailed inspection. If the RPR requests it, the Contractor, at any time before acceptance of the work, shall remove or uncover such portions of the finished work as may be directed. After examination, the Contractor shall restore said portions of the work to the standard required by the specifications. Should the work thus exposed or examined prove acceptable,the uncovering, or removing, and the replacing of the covering or making good of the parts removed will be paid for as extra work; but should the work so exposed or examined prove unacceptable, the uncovering, or removing, and the replacing of the covering or making good of the parts removed will be at the Contractor's expense. Provide advance written notice to the RPR of work the Contractor plans to perform each week and each day. Any work done or materials used without written notice and allowing opportunity for inspection by the RPR may be ordered removed and replaced at the Contractor's expense. Should the contract work include relocation, adjustment, or any other modification to existing facilities, not the property of the (contract) Owner, authorized representatives of the Owners of such facilities shall have the right to inspect such work. Such inspection shall in no sense make any facility owner a party to the contract, and shall in no way interfere with the rights of the parties to this contract. 50-10 Removal of unacceptable and unauthorized work. All work that does not conform to the requirements of the contract, plans, and specifications will be considered unacceptable, unless otherwise determined acceptable by the RPR as provided in paragraph 50-02, Conformity with Plans and Specifications. Unacceptable work, whether the result of poor workmanship, use of defective materials, damage through carelessness, or any other cause found to exist prior to the final acceptance of the work, shall be removed immediately and replaced in an acceptable manner in accordance with the provisions of Section 70, paragraph 70-14, Contractor's Responsibility for Work. No removal work made under provision of this paragraph shall be done without lines and grades having been established by the RPR. Work done contrary to the instructions of the RPR, work done beyond the lines shown on the plans or as established by the RPR, except as herein specified, or any extra work done without authority, will be considered as unauthorized and will not be paid for under the provisions of the contract. Work so done may be ordered removed or replaced at the Contractor's expense. Upon failure on the part of the Contractor to comply with any order of the RPR made under the provisions of this subsection, the RPR will have authority to cause unacceptable work to be remedied or removed and replaced; and unauthorized work to be removed and recover the resulting costs as a liquidated damage against the Contractor. 50-11 Load restrictions. The Contractor shall comply with all legal load restrictions in the hauling of materials on public roads beyond the limits of the work. A special permit will not relieve the Contractor of liability for damage that may result from the moving of material or equipment. General Provisions 00 74 01-21 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 The operation of equipment of such weight or so loaded as to cause damage to structures or to any other type of construction will not be permitted. Hauling of materials over the base course or surface course under construction shall be limited as directed. No loads will be permitted on a concrete pavement, base, or structure before the expiration of the curing period. The Contractor, at their own expense, shall be responsible for the repair to equal or better than preconstruction conditions of any damage caused by the Contractor's equipment and personnel. 50-12 Maintenance during construction. The Contractor shall maintain the work during construction and until the work is accepted. Maintenance shall constitute continuous and effective work prosecuted day by day,with adequate equipment and forces so that the work is maintained in satisfactory condition at all times. In the case of a contract for the placing of a course upon a course or subgrade previously constructed, the Contractor shall maintain the previous course or subgrade during all construction operations. All costs of maintenance work during construction and before the project is accepted shall be included in the unit prices bid on the various contract items, and the Contractor will not be paid an additional amount for such work. 50-13 Failure to maintain the work. Should the Contractor at any time fail to maintain the work as provided in paragraph 50-12, Maintenance during Construction, the RPR shall immediately notify the Contractor of such noncompliance. Such notification shall specify a reasonable time within which the Contractor shall be required to remedy such unsatisfactory maintenance condition. The time specified will give due consideration to the exigency that exists. Should the Contractor fail to respond to the RPR's notification,the Owner may suspend any work necessary for the Owner to correct such unsatisfactory maintenance condition, depending on the exigency that exists. Any maintenance cost incurred by the Owner, shall be recovered as a liquidated damage against the Contractor. 50-14 Partial acceptance. If at any time during the execution of the project the Contractor substantially completes a usable unit or portion of the work,the occupancy of which will benefit the Owner,the Contractor may request the RPR to make final inspection of that unit. If the RPR finds upon inspection that the unit has been satisfactorily completed in compliance with the contract, the RPR may accept it as being complete, and the Contractor may be relieved of further responsibility for that unit. Such partial acceptance and beneficial occupancy by the Owner shall not void or alter any provision of the contract. 50-15 Final acceptance. Upon due notice from the Contractor of presumptive completion of the entire project, the RPR and Owner will make an inspection. If all construction provided for and contemplated by the contract is found to be complete in accordance with the contract, plans, and specifications, such inspection shall constitute the final inspection. The RPR shall notify the Contractor in writing of final acceptance as of the date of the final inspection. If, however, the inspection discloses any work, in whole or in part, as being unsatisfactory, the RPR will notify the Contractor and the Contractor shall correct the unsatisfactory work. Upon correction of the work, another inspection will be made which shall constitute the final inspection, provided the work has been satisfactorily completed. In such event, the RPR will make the final acceptance and notify the Contractor in writing of this acceptance as of the date of final inspection. 50-16 Claims for adjustment and disputes. If for any reason the Contractor deems that additional compensation is due for work or materials not clearly provided for in the contract, plans, or specifications or previously authorized as extra work, the Contractor shall notify the RPR in writing of their intention to claim such additional compensation before the Contractor begins the work on which the Contractor bases the claim. If such notification is not given or the RPR is not afforded proper opportunity by the Contractor for keeping strict account of actual cost as required, then the Contractor hereby agrees to waive any claim for such additional compensation.Such notice by the Contractor and the fact that the RPR has kept account of the cost of the work shall not in any way be construed as proving or substantiating the validity of the claim. When the work on which the claim for additional compensation is based has been completed, the Contractor shall,within 10 calendar days, submit a written claim to the RPR who will present it to the Owner for consideration in accordance with local laws or ordinances. General Provisions 00 74 01-22 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 Nothing in this subsection shall be construed as a waiver of the Contractor's right to dispute final payment based on differences in measurements or computations. END OF SECTION 50 General Provisions 00 74 01-23 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY LEFT BLANK General Provisions 00 74 01-24 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 SECTION 60 CONTROL OF MATERIALS 60-01 Source of supply and quality requirements. The materials used in the work shall conform to the requirements of the contract, plans, and specifications. Unless otherwise specified, such materials that are manufactured or processed shall be new (as compared to used or reprocessed). In order to expedite the inspection and testing of materials, the Contractor shall furnish documentation to the RPR as to the origin, composition, and manufacture of all materials to be used in the work. Documentation shall be furnished promptly after execution of the contract but, in all cases, prior to delivery of such materials. At the RPR's option, materials may be approved at the source of supply before delivery. If it is found after trial that sources of supply for previously approved materials do not produce specified products, the Contractor shall furnish materials from other sources. The Contractor shall furnish airport lighting equipment that meets the requirements of the specifications; and is listed in AC 150/5345-53, Airport Lighting Equipment Certification Program and Addendum, that is in effect on the date of advertisement. 60-02 Samples,tests, and cited specifications. All materials used in the work shall be inspected, tested, and approved by the RPR before incorporation in the work unless otherwise designated. Any work in which untested materials are used without approval or written permission of the RPR shall be performed at the Contractor's risk. Materials found to be unacceptable and unauthorized will not be paid for and, if directed by the RPR, shall be removed at the Contractor's expense. Unless otherwise designated, quality assurance tests will be made by and at the expense of the Owner in accordance with the cited standard methods of ASTM, American Association of State Highway and Transportation Officials (AASHTO), federal specifications, Commercial Item Descriptions, and all other cited methods, which are current on the date of advertisement for bids. The testing organizations performing on-site quality assurance field tests shall have copies of all referenced standards on the construction site for use by all technicians and other personnel. Unless otherwise designated, samples for quality assurance will be taken by a qualified representative of the RPR. All materials being used are subject to inspection, test, or rejection at any time prior to or during incorporation into the work. Copies of all tests will be furnished to the Contractor's representative at their request after review and approval of the RPR. A copy of all Contractor QC test data shall be provided to the RPR daily, along with printed reports, in an approved format, on a weekly basis. After completion of the project, and prior to final payment, the Contractor shall submit a final report to the RPR showing all test data reports, plus an analysis of all results showing ranges, averages, and corrective action taken on all failing tests. The Contractor shall employ a Quality Control (QC)testing organization to perform all Contractor required QC tests in accordance with Item C-100 Contractor Quality Control Program (CQCP). 60-03 Certification of compliance/analysis (COC/COA). The RPR may permit the use, prior to sampling and testing, of certain materials or assemblies when accompanied by manufacturer's COC stating that such materials or assemblies fully comply with the requirements of the contract. The certificate shall be signed by the manufacturer. Each lot of such materials or assemblies delivered to the work must be accompanied by a certificate of compliance in which the lot is clearly identified. The COA is the manufacturer's COC and includes all applicable test results. Materials or assemblies used on the basis of certificates of compliance may be sampled and tested at any time and if found not to be in conformity with contract requirements will be subject to rejection whether in place or not. The form and distribution of certificates of compliance shall be as approved by the RPR. General Provisions 00 74 01-25 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 When a material or assembly is specified by"brand name or equal" and the Contractor elects to furnish the specified "or equal,"the Contractor shall be required to furnish the manufacturer's certificate of compliance for each lot of such material or assembly delivered to the work. Such certificate of compliance shall clearly identify each lot delivered and shall certify as to: a. Conformance to the specified performance, testing, quality or dimensional requirements; and, b. Suitability of the material or assembly for the use intended in the contract work. The RPR shall be the sole judge as to whether the proposed "or equal" is suitable for use in the work. The RPR reserves the right to refuse permission for use of materials or assemblies on the basis of certificates of compliance. 60-04 Plant inspection. The RPR or their authorized representative may inspect, at its source, any specified material or assembly to be used in the work. Manufacturing plants may be inspected from time to time for the purpose of determining compliance with specified manufacturing methods or materials to be used in the work and to obtain samples required for acceptance of the material or assembly. Should the RPR conduct plant inspections, the following conditions shall exist: a. The RPR shall have the cooperation and assistance of the Contractor and the producer with whom the Contractor has contracted for materials. b. The RPR shall have full entry at all reasonable times to such parts of the plant that concern the manufacture or production of the materials being furnished. c. If required by the RPR, the Contractor shall arrange for adequate office or working space that may be reasonably needed for conducting plant inspections. Place office or working space in a convenient location with respect to the plant. It is understood and agreed that the Owner shall have the right to retest any material that has been tested and approved at the source of supply after it has been delivered to the site. The RPR shall have the right to reject only material which, when retested, does not meet the requirements of the contract, plans, or specifications. 60-05 Engineer/Resident Project Representative (RPR)field office. See Section C-105. 60-06 Storage of materials. Materials shall be stored to assure the preservation of their quality and fitness for the work. Stored materials, even though approved before storage, may again be inspected prior to their use in the work. Stored materials shall be located to facilitate their prompt inspection. The Contractor shall coordinate the storage of all materials with the RPR. Materials to be stored on airport property shall not create an obstruction to air navigation nor shall they interfere with the free and unobstructed movement of aircraft. Unless otherwise shown on the plans and/or CSPP,the storage of materials and the location of the Contractor's plant and parked equipment or vehicles shall be as directed by the RPR. Private property shall not be used for storage purposes without written permission of the Owner or lessee of such property. The Contractor shall make all arrangements and bear all expenses for the storage of materials on private property. Upon request, the Contractor shall furnish the RPR a copy of the property Owner's permission. All storage sites on private or airport property shall be restored to their original condition by the Contractor at their expense, except as otherwise agreed to (in writing) by the Owner or lessee of the property. 60-07 Unacceptable materials. Any material or assembly that does not conform to the requirements of the contract, plans,or specifications shall be considered unacceptable and shall be rejected.The Contractor shall remove any rejected material or assembly from the site of the work, unless otherwise instructed by the RPR. Rejected material or assembly, the defects of which have been corrected by the Contractor, shall not be returned to the site of the work until such time as the RPR has approved its use in the work. General Provisions 00 74 01-26 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 60-08 Owner furnished materials.The Contractor shall furnish all materials required to complete the work, except those specified, if any, to be furnished by the Owner. Owner-furnished materials shall be made available to the Contractor at the location specified. All costs of handling, transportation from the specified location to the site of work, storage, and installing Owner-furnished materials shall be included in the unit price bid for the contract item in which such Owner- furnished material is used. After any Owner-furnished material has been delivered to the location specified, the Contractor shall be responsible for any demurrage, damage, loss, or other deficiencies that may occur during the Contractor's handling, storage, or use of such Owner-furnished material. The Owner will deduct from any monies due or to become due the Contractor any cost incurred by the Owner in making good such loss due to the Contractor's handling, storage, or use of Owner-furnished materials. END OF SECTION 60 General Provisions 00 74 01-27 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY LEFT BLANK General Provisions 00 74 01-28 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 SECTION 70 LEGAL REGULATIONS AND RESPONSIBILITY TO PUBLIC 70-01 Laws to be observed.The Contractor shall keep fully informed of all federal and state laws, all local laws, ordinances, and regulations and all orders and decrees of bodies or tribunals having any jurisdiction or authority,which in any manner affect those engaged or employed on the work, or which in any way affect the conduct of the work.The Contractor shall at all times observe and comply with all such laws, ordinances, regulations, orders, and decrees; and shall protect and indemnify the Owner and all their officers, agents, or servants against any claim or liability arising from or based on the violation of any such law, ordinance, regulation, order, or decree, whether by the Contractor or the Contractor's employees. 70-02 Permits,licenses,and taxes.The Contractor shall procure all permits and licenses, pay all charges, fees, and taxes, and give all notices necessary and incidental to the due and lawful execution of the work. 70-03 Patented devices, materials, and processes. If the Contractor is required or desires to use any design, device, material, or process covered by letters of patent or copyright, the Contractor shall provide for such use by suitable legal agreement with the Patentee or Owner. The Contractor and the surety shall indemnify and hold harmless the Owner, any third party, or political subdivision from any and all claims for infringement by reason of the use of any such patented design, device, material or process, or any trademark or copyright, and shall indemnify the Owner for any costs, expenses, and damages which it may be obliged to pay by reason of an infringement, at any time during the execution or after the completion of the work. 70-04 Restoration of surfaces disturbed by others. The Owner reserves the right to authorize the construction, reconstruction,or maintenance of any public or private utility service, FAA or National Oceanic and Atmospheric Administration (NOAA) facility, or a utility service of another government agency at any time during the progress of the work. To the extent that such construction, reconstruction, or maintenance has been coordinated with the Owner, such authorized work (by others) must be shown on the plans and is indicated as follows: NONE Except as listed above, the Contractor shall not permit any individual, firm, or corporation to excavate or otherwise disturb such utility services or facilities located within the limits of the work without the written permission of the RPR. Should the Owner of public or private utility service, FAA, or NOAA facility, or a utility service of another government agency be authorized to construct, reconstruct, or maintain such utility service or facility during the progress of the work,the Contractor shall cooperate with such Owners by arranging and performing the work in this contract to facilitate such construction, reconstruction or maintenance by others whether or not such work by others is listed above. When ordered as extra work by the RPR, the Contractor shall make all necessary repairs to the work which are due to such authorized work by others, unless otherwise provided for in the contract, plans, or specifications. It is understood and agreed that the Contractor shall not be entitled to make any claim for damages due to such authorized work by others or for any delay to the work resulting from such authorized work. 70-05 Federal Participation.The United States Government has agreed to reimburse the Owner for some portion of the contract costs. The contract work is subject to the inspection and approval of duly authorized representatives of the FAA Administrator. No requirement of this contract shall be construed as making the United States a party to the contract nor will any such requirement interfere, in any way, with the rights of either party to the contract. 70-06 Sanitary, health, and safety provisions. The Contractor's worksite and facilities shall comply with applicable federal, state, and local requirements for health, safety and sanitary provisions. 70-07 Public convenience and safety. The Contractor shall control their operations and those of their subcontractors and all suppliers, to assure the least inconvenience to the traveling public. Under all circumstances, safety shall be the most important consideration. The Contractor shall maintain the free and unobstructed movement of aircraft and vehicular traffic with respect to their own operations and those of their own subcontractors and all suppliers in accordance with General Provisions 00 74 01-29 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 Section 40, paragraph 40-05, Maintenance of Traffic, and shall limit such operations for the convenience and safety of the traveling public as specified in Section 80, paragraph 80-04, Limitation of Operations. The Contractor shall remove or control debris and rubbish resulting from its work operations at frequent intervals, and upon the order of the RPR. If the RPR determines the existence of Contractor debris in the work site represents a hazard to airport operations and the Contractor is unable to respond in a prompt and reasonable manner, the RPR reserves the right to assign the task of debris removal to a third party and recover the resulting costs as a liquidated damage against the Contractor. 70-08 Construction Safety and Phasing Plan (CSPP). The Contractor shall complete the work in accordance with the approved Construction Safety and Phasing Plan (CSPP) developed in accordance with AC 150/5370-2, Operational Safety on Airports During Construction. The CSPP is on sheet(s) of the plan set. 70-09 Use of explosives. The use of explosives is not permitted on this project. 70-10 Protection and restoration of property and landscape. The Contractor shall be responsible for the preservation of all public and private property, and shall protect carefully from disturbance or damage all land monuments and property markers until the Engineer/RPR has witnessed or otherwise referenced their location and shall not move them until directed. The Contractor shall be responsible for all damage or injury to property of any character, during the execution of the work, resulting from any act, omission, neglect, or misconduct in manner or method of executing the work, or at any time due to defective work or materials, and said responsibility shall not be released until the project has been completed and accepted. When or where any direct or indirect damage or injury is done to public or private property by or on account of any act, omission, neglect, or misconduct in the execution of the work, or in consequence of the non- execution thereof by the Contractor, the Contractor shall restore, at their expense, such property to a condition similar or equal to that existing before such damage or injury was done, by repairing, or otherwise restoring as may be directed, or the Contractor shall make good such damage or injury in an acceptable manner. 70-11 Responsibility for damage claims. The Contractor shall indemnify and hold harmless the Engineer/RPR and the Owner and their officers, agents, and employees from all suits, actions, or claims, of any character, brought because of any injuries or damage received or sustained by any person, persons, or property on account of the operations of the Contractor; or on account of or in consequence of any neglect in safeguarding the work; or through use of unacceptable materials in constructing the work; or because of any act or omission, neglect, or misconduct of said Contractor; or because of any claims or amounts recovered from any infringements of patent, trademark, or copyright; or from any claims or amounts arising or recovered under the"Workmen's Compensation Act,"or any other law,ordinance,order, or decree. Money due the Contractor under and by virtue of their own contract considered necessary by the Owner for such purpose may be retained for the use of the Owner or, in case no money is due, their own surety may be held until such suits, actions, or claims for injuries or damages shall have been settled and suitable evidence to that effect furnished to the Owner, except that money due the Contractor will not be withheld when the Contractor produces satisfactory evidence that he or she is adequately protected by public liability and property damage insurance. 70-12 Third party beneficiary clause. It is specifically agreed between the parties executing the contract that it is not intended by any of the provisions of any part of the contract to create for the public or any member thereof, a third-party beneficiary or to authorize anyone not a party to the contract to maintain a suit for personal injuries or property damage pursuant to the terms or provisions of the contract. 70-13 Opening sections of the work to traffic. If it is necessary for the Contractor to complete portions of the contract work for the beneficial occupancy of the Owner prior to completion of the entire contract, such "phasing"of the work must be specified below and indicated on the approved Construction Safety and Phasing Plan(CSPP)and the project plans.When so specified,the Contractor shall complete such portions of the work on or before the date specified or as otherwise specified. General Provisions 00 74 01-30 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 Detailed phasing information is provided in the Construction Safety and Phasing Plan. Upon completion of any portion of work listed above, such portion shall be accepted by the Owner in accordance with Section 50, paragraph 50-14, Partial Acceptance. No portion of the work may be opened by the Contractor until directed by the Owner in writing. Should it become necessary to open a portion of the work to traffic on a temporary or intermittent basis, such openings shall be made when, in the opinion of the RPR, such portion of the work is in an acceptable condition to support the intended traffic. Temporary or intermittent openings are considered to be inherent in the work and shall not constitute either acceptance of the portion of the work so opened or a waiver of any provision of the contract. Any damage to the portion of the work so opened that is not attributable to traffic which is permitted by the Owner shall be repaired by the Contractor at their expense. The Contractor shall make their own estimate of the inherent difficulties involved in completing the work under the conditions herein described and shall not claim any added compensation by reason of delay or increased cost due to opening a portion of the contract work. The Contractor must conform to safety standards contained AC 150/5370-2 and the approved CSPP. Contractor shall refer to the plans, specifications, and the approved CSPP to identify barricade requirements, temporary and/or permanent markings, airfield lighting, guidance signs and other safety requirements prior to opening up sections of work to traffic. 70-14 Contractor's responsibility for work. Until the RPR's final written acceptance of the entire completed work, excepting only those portions of the work accepted in accordance with Section 50, paragraph 50-14, Partial Acceptance, the Contractor shall have the charge and care thereof and shall take every precaution against injury or damage to any part due to the action of the elements or from any other cause, whether arising from the execution or from the non-execution of the work. The Contractor shall rebuild, repair, restore, and make good all injuries or damages to any portion of the work occasioned by any of the above causes before final acceptance and shall bear the expense thereof except damage to the work due to unforeseeable causes beyond the control of and without the fault or negligence of the Contractor, including but not restricted to acts of God such as earthquake, tidal wave, tornado, hurricane or other cataclysmic phenomenon of nature, or acts of the public enemy or of government authorities. If the work is suspended for any cause whatever, the Contractor shall be responsible for the work and shall take such precautions necessary to prevent damage to the work. The Contractor shall provide for normal drainage and shall erect necessary temporary structures, signs, or other facilities at their own expense. During such period of suspension of work, the Contractor shall properly and continuously maintain in an acceptable growing condition all living material in newly established planting, seeding, and sodding furnished under the contract, and shall take adequate precautions to protect new tree growth and other important vegetative growth against injury. 70-15 Contractor's responsibility for utility service and facilities of others. As provided in paragraph 70-04, Restoration of Surfaces Disturbed by Others, the Contractor shall cooperate with the owner of any public or private utility service, FAA or NOAA, or a utility service of another government agency that may be authorized by the Owner to construct, reconstruct or maintain such utility services or facilities during the progress of the work. In addition, the Contractor shall control their operations to prevent the unscheduled interruption of such utility services and facilities. To the extent that such public or private utility services, FAA, or NOAA facilities, or utility services of another governmental agency are known to exist within the limits of the contract work, the approximate locations have been indicated on the plans and/or in the contract documents. None are anticipated in the vicinity of the project. It is understood and agreed that the Owner does not guarantee the accuracy or the completeness of the location information relating to existing utility services, facilities, or structures that may be shown on the plans or encountered in the work. Any inaccuracy or omission in such information shall not relieve the Contractor of the responsibility to protect such existing features from damage or unscheduled interruption of service. General Provisions 00 74 01-31 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 It is further understood and agreed that the Contractor shall, upon execution of the contract, notify the Owners of all utility services or other facilities of their plan of operations. Such notification shall be in writing addressed to "The Person to Contact" as provided in this paragraph and paragraph 70-04, Restoration of Surfaces Disturbed By Others.A copy of each notification shall be given to the RPR. In addition to the general written notification provided, it shall be the responsibility of the Contractor to keep such individual Owners advised of changes in their plan of operations that would affect such Owners. Prior to beginning the work in the general vicinity of an existing utility service or facility, the Contractor shall again notify each such Owner of their plan of operation. If, in the Contractor's opinion, the Owner's assistance is needed to locate the utility service or facility or the presence of a representative of the Owner is desirable to observe the work, such advice should be included in the notification. Such notification shall be given by the most expeditious means to reach the utility owner's "Person to Contact" no later than two normal business days prior to the Contractor's commencement of operations in such general vicinity. The Contractor shall furnish a written summary of the notification to the RPR. The Contractor's failure to give the two days' notice shall be cause for the Owner to suspend the Contractor's operations in the general vicinity of a utility service or facility. Where the outside limits of an underground utility service have been located and staked on the ground, the Contractor shall be required to use hand excavation methods within 3 feet (1 m) of such outside limits at such points as may be required to ensure protection from damage due to the Contractor's operations. Should the Contractor damage or interrupt the operation of a utility service or facility by accident or otherwise, the Contractor shall immediately notify the proper authority and the RPR and shall take all reasonable measures to prevent further damage or interruption of service. The Contractor, in such events, shall cooperate with the utility service or facility owner and the RPR continuously until such damage has been repaired and service restored to the satisfaction of the utility or facility owner. The Contractor shall bear all costs of damage and restoration of service to any utility service or facility due to their operations whether due to negligence or accident. The Owner reserves the right to deduct such costs from any monies due or which may become due the Contractor, or their own surety. 70-16 Furnishing rights-of-way. The Owner will be responsible for furnishing all rights-of-way upon which the work is to be constructed in advance of the Contractor's operations. 70-17 Personal liability of public officials. In carrying out any of the contract provisions or in exercising any power or authority granted by this contract, there shall be no liability upon the Engineer, RPR, their authorized representatives, or any officials of the Owner either personally or as an official of the Owner. It is understood that in such matters they act solely as agents and representatives of the Owner. 70-18 No waiver of legal rights. Upon completion of the work, the Owner will expeditiously make final inspection and notify the Contractor of final acceptance. Such final acceptance, however,shall not preclude or stop the Owner from correcting any measurement, estimate, or certificate made before or after completion of the work, nor shall the Owner be precluded or stopped from recovering from the Contractor or their surety, or both, such overpayment as may be sustained, or by failure on the part of the Contractor to fulfill their obligations under the contract. A waiver on the part of the Owner of any breach of any part of the contract shall not be held to be a waiver of any other or subsequent breach. The Contractor,without prejudice to the terms of the contract, shall be liable to the Owner for latent defects, fraud, or such gross mistakes as may amount to fraud, or as regards the Owner's rights under any warranty or guaranty. 70-19 Environmental protection. The Contractor shall comply with all federal, state, and local laws and regulations controlling pollution of the environment. The Contractor shall take necessary precautions to prevent pollution of streams, lakes, ponds, and reservoirs with fuels, oils, asphalts, chemicals, or other harmful materials and to prevent pollution of the atmosphere from particulate and gaseous matter. General Provisions 00 74 01-32 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 70-20 AFGhaeoIGgiGaI and histeriGal findings. Unless otherwise Sp8G'f'ed on this subseGtion, the CGRtraGtGF is advised that the sote of the wGrk is net within aRY PFGperty,diStFiGt, Gr site,and deeS REA GGntain any building, StFUGture, or objeGt listed On the Gurrent National Register of HistoriG PaGes published by the United States Department of Interior. Sheuld the CE)RtraGtE)r eRGGunter, during their eperatiGRs,aRy building, part ef a building,StFLAGture,er objeG and notify the RPR.The RPR I.A.411 immediately investigate the Gentraar-le-r's finding andd the Q�.A.4ner will d'reGt the Gant ra Star to either resurne nperatinns nr to suspe nr! opera#inns as r7ireeter! h'Steror—al finding, or order the Gentrac;ter to perform extra werk, sur--h shall he GOvered by -ARd S-er--A.an 90, paragraph 90 05, Payment for ExtFa W-oFk. if appropriate, the GentraGt Ghange order er supplemental agreement shall indude aR extension Of G.GntraGt torne in aGGerdanGe with Sedien 8-(� paragraph 80 07 Determination a le rf and -FVtenP of nntrant Time 'Il 70-21 Insurance Requirements. See Special Provisions. END OF SECTION 70 General Provisions 00 74 01-33 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY LEFT BLANK General Provisions 00 74 01-34 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 SECTION 80 EXECUTION AND PROGRESS 80-01 Subletting of contract.The Owner will not recognize any subcontractor on the work.The Contractor shall at all times when work is in progress be represented either in person, by a qualified superintendent, or by other designated, qualified representative who is duly authorized to receive and execute orders of the Resident Project Representative (RPR). The Contractor shall perform, with his organization, an amount of work equal to at least 30 percent of the total contract cost. Should the Contractor elect to assign their contract, said assignment shall be concurred in by the surety, shall be presented for the consideration and approval of the Owner, and shall be consummated only on the written approval of the Owner. If requested, the Contractor shall provide copies of all subcontracts to the OAR or designated representatives 14 days prior to being utilized on the project. As a minimum, the information shall include the following: • Subcontractor's legal company name. • Subcontractor's legal company address, including County name. • Principal contact person's name, telephone and fax number. • Complete narrative description, and dollar value of the work to be performed by the subcontractor. • Copies of required insurance certificates in accordance with the specifications. • Minority/non-minority status. 80-02 Notice to proceed (NTP). The Owners notice to proceed will state the date on which contract time commences. The Contractor is expected to commence project operations within 10 days of the NTP date. The Contractor shall notify the RPR at least 72 hours in advance of the time contract operations begins. The Contractor shall not commence any actual operations prior to the date on which the notice to proceed is issued by the Owner. 80-03 Execution and progress. Unless otherwise specified, the Contractor shall submit their coordinated construction schedule showing all work activities for the RPR's review and acceptance at least 10 days prior to the start of work and in advance of the preconstruction meeting. The Contractor's progress schedule,once accepted by the RPR,will represent the Contractor's baseline plan to accomplish the project in accordance with the terms and conditions of the Contract. The RPR will compare actual Contractor progress against the baseline schedule to determine that status of the Contractor's performance. The Contractor shall provide sufficient materials, equipment, and labor to guarantee the completion of the project in accordance with the plans and specifications within the time set forth in the proposal. If the Contractor falls significantly behind the submitted schedule, the Contractor shall, upon the RPR's request, submit a revised schedule for completion of the work within the contract time and modify their operations to provide such additional materials, equipment, and labor necessary to meet the revised schedule. Should the execution of the work be discontinued for any reason, the Contractor shall notify the RPR at least 72 hours in advance of resuming operations. The Contractor shall not commence any actual construction prior to the date on which the NTP is issued by the Owner. The project schedule shall be prepared as a network diagram in Critical Path Method (CPM), Program Evaluation and Review Technique (PERT), or other format, or as otherwise specified. It shall include information on the sequence of work activities, milestone dates, and activity duration. The schedule shall show all work items identified in the project proposal for each work area and shall include the project start date and end date. General Provisions 00 74 01-35 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 The Contractor shall maintain the work schedule and provide an update and analysis of the progress schedule on a twice monthly basis, or as otherwise specified in the contract. Submission of the work schedule shall not relieve the Contractor of overall responsibility for scheduling, sequencing, and coordinating all work to comply with the requirements of the contract. 80-04 Limitation of operations. The Contractor shall control their operations and the operations of their subcontractors and all suppliers to provide for the free and unobstructed movement of aircraft in the air operations areas (AOA)of the airport. When the work requires the Contractor to conduct their operations within an AOA of the airport, the work shall be coordinated with airport operations (through the RPR)at least 72 hours prior to commencement of such work. The Contractor shall not close an AOA until so authorized by the RPR and until the necessary temporary marking, signage and associated lighting is in place as provided in Section 70, paragraph 70- 08, Construction Safety and Phasing Plan (CSPP). When the contract work requires the Contractor to work within an AOA of the airport on an intermittent basis (intermittent opening and closing of the AOA), the Contractor shall maintain constant communications as specified; immediately obey all instructions to vacate the AOA; and immediately obey all instructions to resume work in such AOA. Failure to maintain the specified communications or to obey instructions shall be cause for suspension of the Contractor's operations in the AOA until satisfactory conditions are provided. The areas of the AOA identified in the Construction Safety Phasing Plan (CSPP)and as listed belew,cannot be closed to operating aircraft to permit the Contractor's operations on a continuous basis and will therefore be closed to aircraft operations intermittently as follows: The Contractor shall be required to conform to safety standards contained in AC 150/5370-2, Operational Safety on Airports During Construction and the approved CSPP. 80-04.1 Operational safety on airport during construction. All Contractors' operations shall be conducted in accordance with the approved project Construction Safety and Phasing Plan (CSPP) and the Safety Plan Compliance Document (SPCD) and the provisions set forth within the current version of AC 150/5370-2, Operational Safety on Airports During Construction. The CSPP included within the contract documents conveys minimum requirements for operational safety on the airport during construction activities. The Contractor shall prepare and submit a SPCD that details how it proposes to comply with the requirements presented within the CSPP. The Contractor shall implement all necessary safety plan measures prior to commencement of any work activity. The Contractor shall conduct routine checks to assure compliance with the safety plan measures. The Contractor is responsible to the Owner for the conduct of all subcontractors it employs on the project. The Contractor shall assure that all subcontractors are made aware of the requirements of the CSPP and SPCD and that they implement and maintain all necessary measures. No deviation or modifications may be made to the approved CSPP and SPCD unless approved in writing by the Owner. The necessary coordination actions to review Contractor proposed modifications to an approved CSPP or approved SPCD can require a significant amount of time. 80-05 Character of workers, methods, and equipment. The Contractor shall, at all times, employ sufficient labor and equipment for prosecuting the work to full completion in the manner and time required by the contract, plans, and specifications. All workers shall have sufficient skill and experience to perform properly the work assigned to them.Workers engaged in special work or skilled work shall have sufficient experience in such work and in the operation of the equipment required to perform the work satisfactorily. Any person employed by the Contractor or by any subcontractor who violates any operational regulations or operational safety requirements and, in the opinion of the RPR, does not perform his work in a proper and skillful manner or is intemperate or disorderly shall, at the written request of the RPR, be removed immediately by the Contractor or subcontractor employing such person, and shall not be employed again in any portion of the work without approval of the RPR. General Provisions 00 74 01-36 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 Should the Contractor fail to remove such person or persons, or fail to furnish suitable and sufficient personnel for the proper execution of the work, the RPR may suspend the work by written notice until compliance with such orders. All equipment that is proposed to be used on the work shall be of sufficient size and in such mechanical condition as to meet requirements of the work and to produce a satisfactory quality of work. Equipment used on any portion of the work shall not cause injury to previously completed work, adjacent property, or existing airport facilities due to its use. When the methods and equipment to be used by the Contractor in accomplishing the work are not prescribed in the contract, the Contractor is free to use any methods or equipment that will accomplish the work in conformity with the requirements of the contract, plans, and specifications. When the contract specifies the use of certain methods and equipment, such methods and equipment shall be used unless otherwise authorized by the RPR. If the Contractor desires to use a method or type of equipment other than specified in the contract, the Contractor may request authority from the RPR to do so. The request shall be in writing and shall include a full description of the methods and equipment proposed and of the reasons for desiring to make the change. If approval is given, it will be on the condition that the Contractor will be fully responsible for producing work in conformity with contract requirements. If, after trial use of the substituted methods or equipment, the RPR determines that the work produced does not meet contract requirements, the Contractor shall discontinue the use of the substitute method or equipment and shall complete the remaining work with the specified methods and equipment. The Contractor shall remove any deficient work and replace it with work of specified quality, or take such other corrective action as the RPR may direct. No change will be made in basis of payment for the contract items involved nor in contract time as a result of authorizing a change in methods or equipment under this paragraph. 80-06 Temporary suspension of the work. The Owner shall have the authority to suspend the work wholly, or in part, for such period or periods the Owner may deem necessary, due to unsuitable weather, or other conditions considered unfavorable for the execution of the work, or for such time necessary due to the failure on the part of the Contractor to carry out orders given or perform any or all provisions of the contract. In the event that the Contractor is ordered by the Owner, in writing, to suspend work for some unforeseen cause not otherwise provided for in the contract and over which the Contractor has no control, the Contractor may be reimbursed for actual money expended on the work during the period of shutdown. No allowance will be made for anticipated profits. The period of shutdown shall be computed from the effective date of the written order to suspend work to the effective date of the written order to resume the work. Claims for such compensation shall be filed with the RPR within the time period stated in the RPR's order to resume work. The Contractor shall submit with their own claim information substantiating the amount shown on the claim. The RPR will forward the Contractor's claim to the Owner for consideration in accordance with local laws or ordinances. No provision of this article shall be construed as entitling the Contractor to compensation for delays due to inclement weather or for any other delay provided for in the contract, plans, or specifications. If it becomes necessary to suspend work for an indefinite period, the Contractor shall store all materials in such manner that they will not become an obstruction nor become damaged in any way. The Contractor shall take every precaution to prevent damage or deterioration of the work performed and provide for normal drainage of the work.The Contractor shall erect temporary structures where necessary to provide for traffic on, to, or from the airport. 80-07 Determination and extension of contract time. The number of calendar days shall be stated in the proposal (bid form) and contract (agreement) and shall be known as the Contract Time. If the contract time requires extension for reasons beyond the Contractor's control, it shall be adjusted as follows: 80-07.1 Contract time based on calendar days. See Section 00 52 23 Agreement and 00 72 00 General Conditions. General Provisions 00 74 01-37 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 80-08 Failure to complete on time. See Section 00 52 23 Agreement and 00 72 00 General Conditions after the GontraGt tirne (induding all extensions and adjustments as prov ded paragraph 80 07, Determination and Extension of GontraGt Time)the sum speGified on the Gent )sal as liquida darnages (LID)will be dedUGted frern any meney due or to beGOme due the GentraGter or their own surety reasonable portion of damages inGluding but not limited to add 0 tional engineering serv'Ges thnt W011 h, OPhR S of IIn14idate 1 rlomonao era innLide-1 in the Gentr Gt Cnhedulc e Liquidated Damages /��cf Alhuied /-nnstFUGtinn Time varrca-ar Construction time shall be as included in the Contract (Agreement). The maximum GenStFu ti„n time for SGhedules [===] will be the siurn ef the time allowed fe-r individ-1-1-A.1 sGhedules but net more tha-ri days.- Permitting the Contractor to continue and finish the work or any part of it after the time fixed for its completion, or after the date to which the time for completion may have been extended, will in no way operate as a wavier on the part of the Owner of any of its rights under the contract. 80-09 Default and termination of contract. The Contractor shall be considered in default of their contract and such default will be considered as cause for the Owner to terminate the contract for any of the following reasons, if the Contractor: a. Fails to begin the work under the contract within the time specified in the Notice to Proceed, or b. Fails to perform the work or fails to provide sufficient workers, equipment and/or materials to assure completion of work in accordance with the terms of the contract, or c. Performs the work unsuitably or neglects or refuses to remove materials or to perform anew such work as may be rejected as unacceptable and unsuitable, or d. Discontinues the execution of the work, or e. Fails to resume work which has been discontinued within a reasonable time after notice to do so, or f. Becomes insolvent or is declared bankrupt, or commits any act of bankruptcy or insolvency, or g. Allows any final judgment to stand against the Contractor unsatisfied for a period of 10 days, or h. Makes an assignment for the benefit of creditors, or i. For any other cause whatsoever, fails to carry on the work in an acceptable manner. Should the Owner consider the Contractor in default of the contract for any reason above, the Owner shall immediately give written notice to the Contractor and the Contractor's surety as to the reasons for considering the Contractor in default and the Owner's intentions to terminate the contract. If the Contractor or surety, within a period of 10 days after such notice, does not proceed in accordance therewith, then the Owner will, upon written notification from the RPR of the facts of such delay, neglect, or default and the Contractor's failure to comply with such notice, have full power and authority without violating the contract, to take the execution of the work out of the hands of the Contractor. The Owner may appropriate or use any or all materials and equipment that have been mobilized for use in the work and are acceptable and may enter into an agreement for the completion of said contract according to the terms and provisions thereof, or use such other methods as in the opinion of the RPR will be required for the completion of said contract in an acceptable manner. General Provisions 00 74 01-38 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 All costs and charges incurred by the Owner, together with the cost of completing the work under contract, will be deducted from any monies due or which may become due the Contractor. If such expense exceeds the sum which would have been payable under the contract, then the Contractor and the surety shall be liable and shall pay to the Owner the amount of such excess. 80-10 Termination for national emergencies. The Owner shall terminate the contract or portion thereof by written notice when the Contractor is prevented from proceeding with the construction contract as a direct result of an Executive Order of the President with respect to the execution of war or in the interest of national defense. When the contract, or any portion thereof, is terminated before completion of all items of work in the contract, payment will be made for the actual number of units or items of work completed at the contract price or as mutually agreed for items of work partially completed or not started. No claims or loss of anticipated profits shall be considered. Reimbursement for organization of the work, and other overhead expenses, (when not otherwise included in the contract)and moving equipment and materials to and from the job will be considered, the intent being that an equitable settlement will be made with the Contractor. Acceptable materials, obtained or ordered by the Contractor for the work and that are not incorporated in the work shall, at the option of the Contractor, be purchased from the Contractor at actual cost as shown by receipted bills and actual cost records at such points of delivery as may be designated by the RPR. Termination of the contract or a portion thereof shall neither relieve the Contractor of their responsibilities for the completed work nor shall it relieve their surety of its obligation for and concerning any just claim arising out of the work performed. 80-11 Work area, storage area and sequence of operations. The Contractor shall obtain approval from the RPR prior to beginning any work in all areas of the airport. No operating runway, taxiway, or air operations area (AOA)shall be crossed, entered, or obstructed while it is operational. The Contractor shall plan and coordinate work in accordance with the approved CSPP and SPCD. END OF SECTION 80 General Provisions 00 74 01-39 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY LEFT BLANK General Provisions 00 74 01-40 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 SECTION 90 MEASUREMENT AND PAYMENT 90-01 Measurement of quantities. All work completed under the contract will be measured by the RPR, or their authorized representatives, using United States Customary Units of Measurement. The method of measurement and computations to be used in determination of quantities of material furnished and of work performed under the contract will be those methods generally recognized as conforming to good engineering practice. Unless otherwise specified, longitudinal measurements for area computations will be made horizontally, and no deductions will be made for individual fixtures (or leave-outs) having an area of 9 square feet (0.8 square meters) or less. Unless otherwise specified, transverse measurements for area computations will be the neat dimensions shown on the plans or ordered in writing by the RPR. Unless otherwise specified,all contract items which are measured by the linear foot such as electrical ducts, conduits, pipe culverts, underdrains, and similar items shall be measured parallel to the base or foundation upon which such items are placed. The term"lump sum"when used as an item of payment will mean complete payment for the work described in the contract. When a complete structure or structural unit (in effect, "lump sum"work) is specified as the unit of measurement, the unit will be construed to include all necessary fittings and accessories. When requested by the Contractor and approved by the RPR in writing, material specified to be measured by the cubic yard (cubic meter) may be weighed, and such weights will be converted to cubic yards (cubic meters)for payment purposes. Factors for conversion from weight measurement to volume measurement will be determined by the RPR and shall be agreed to by the Contractor before such method of measurement of pay quantities is used. MEASUREMENT AND PAYMENT TERMS Term Description Excavation and In computing volumes of excavation, the average end area method will be used Embankment unless otherwise specified. Volume Measurement and The term "ton" will mean the short ton consisting of 2,000 pounds avoirdupois. All Proportion by materials that are measured or proportioned by weights shall be weighed on Weight accurate, independently certified scales by competent, qualified personnel at locations designated by the RPR. If material is shipped by rail, the car weight may be accepted provided that only the actual weight of material is paid for. However, car weights will not be acceptable for material to be passed through mixing plants. Trucks used to haul material being paid for by weight shall be weighed empty daily at such times as the RPR directs, and each truck shall bear a plainly legible identification mark. Measurement by Materials to be measured by volume in the hauling vehicle shall be hauled in Volume approved vehicles and measured therein at the point of delivery. Vehicles for this purpose may be of any size or type acceptable for the materials hauled, provided that the body is of such shape that the actual contents may be readily and accurately determined. All vehicles shall be loaded to at least their water level capacity, and all loads shall be leveled when the vehicles arrive at the point of delivery. Asphalt Material Asphalt materials will be measured by the gallon or ton. When measured by volume, such volumes will be measured at 60°F (16°C) or will be corrected to the volume at 60OF (16°C)using ASTM D1250 for asphalts. Net certified scale weights or weights based on certified volumes in the case of rail shipments will be used as a basis of measurement,subject to correction when asphalt material has been lost General Provisions 00 74 01-41 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 Term Description from the car or the distributor, wasted, or otherwise not incorporated in the work. When asphalt materials are shipped by truck or transport, net certified weights by volume, subject to correction for loss or foaming, will be used for computing quantities. Cement Cement will be measured by the ton or hundredweight. Structure Structures will be measured according to neat lines shown on the plans or as altered to fit field conditions. Timber Timber will be measured by the thousand feet board measure (MFBM) actually incorporated in the structure. Measurement will be based on nominal widths and thicknesses and the extreme length of each piece. Plates and Sheets The thickness of plates and galvanized sheet used in the manufacture of corrugated metal pipe, metal plate pipe culverts and arches, and metal cribbing will be specified and measured in decimal fraction of inch. Miscellaneous When standard manufactured items are specified such as fence, wire, plates, Items rolled shapes, pipe conduit, etc., and these items are identified by gauge, unit weight, section dimensions, etc., such identification will be considered to be nominal weights or dimensions. Unless more stringently controlled by tolerances in cited specifications, manufacturing tolerances established by the industries involved will be accepted. Scales Scales must be tested for accuracy and serviced before use. Scales for weighing materials which are required to be proportioned or measured and paid for by weight shall be furnished, erected, and maintained by the Contractor, or be certified permanently installed commercial scales. Platform scales shall be installed and maintained with the platform level and rigid bulkheads at each end. Scales shall be accurate within 0.5% of the correct weight throughout the range of use. The Contractor shall have the scales checked under the observation of the RPR before beginning work and at such other times as requested. The intervals shall be uniform in spacing throughout the graduated or marked length of the beam or dial and shall not exceed 0.1% of the nominal rated capacity of the scale, but not less than one pound. The use of spring balances will not be permitted. In the event inspection reveals the scales have been "overweighing" (indicating more than correct weight)they will be immediately adjusted. All materials received subsequent to the last previous correct weighting-accuracy test will be reduced by the percentage of error in excess of 0.5%. In the event inspection reveals the scales have been under-weighing (indicating less than correct weight), they shall be immediately adjusted. No additional payment to the Contractor will be allowed for materials previously weighed and recorded. Beams, dials, platforms, and other scale equipment shall be so arranged that the operator and the RPR can safely and conveniently view them. Scale installations shall have available ten standard 50-pound weights for testing the weighing equipment or suitable weights and devices for other approved equipment. All costs in connection with furnishing, installing, certifying, testing, and maintaining scales;for furnishing check weights and scale house; and for all other items specified in this subsection, for the weighing of materials for proportioning General Provisions 00 74 01-42 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 Term Description or payment, shall be included in the unit contract prices for the various items of the project. Rental Equipment Rental of equipment will be measured by time in hours of actual working time and necessary traveling time of the equipment within the limits of the work. Special equipment ordered in connection with extra work will be measured as agreed in the change order or supplemental agreement authorizing such work as provided in paragraph 90-05 Payment for Extra Work. Pay Quantities When the estimated quantities for a specific portion of the work are designated as the pay quantities in the contract, they shall be the final quantities for which payment for such specific portion of the work will be made, unless the dimensions of said portions of the work shown on the plans are revised by the RPR. If revised dimensions result in an increase or decrease in the quantities of such work, the final quantities for payment will be revised in the amount represented by the authorized changes in the dimensions. 90-02 Scope of payment. The Contractor shall receive and accept compensation provided for in the contract as full payment for furnishing all materials, for performing all work under the contract in a complete and acceptable manner, and for all risk, loss, damage, or expense of whatever character arising out of the nature of the work or the execution thereof, subject to the provisions of Section 70, paragraph 70-18, No Waiver of Legal Rights. When the "basis of payment" subsection of a technical specification requires that the contract price (price bid) include compensation for certain work or material essential to the item, this same work or material will not also be measured for payment under any other contract item which may appear elsewhere in the contract, plans, or specifications. 90-03 Compensation for altered quantities. When the accepted quantities of work vary from the quantities in the proposal, the Contractor shall accept as payment in full, so far as contract items are concerned, payment at the original contract price for the accepted quantities of work actually completed and accepted. No allowance, except as provided for in Section 40, paragraph 40-02,Alteration of Work and Quantities, will be made for any increased expense, loss of expected reimbursement, or loss of anticipated profits suffered or claimed by the Contractor which results directly from such alterations or indirectly from their own unbalanced allocation of overhead and profit among the contract items, or from any other cause. 90-04 Payment for omitted items. As specified in Section 40, paragraph 40-03, Omitted Items, the RPR shall have the right to omit from the work (order nonperformance) any contract item, except major contract items, in the best interest of the Owner. Should the RPR omit or order nonperformance of a contract item or portion of such item from the work, the Contractor shall accept payment in full at the contract prices for any work actually completed and acceptable prior to the RPR's order to omit or non-perform such contract item. Acceptable materials ordered by the Contractor or delivered on the work prior to the date of the RPR's order will be paid for at the actual cost to the Contractor and shall thereupon become the property of the Owner. In addition to the reimbursement hereinbefore provided, the Contractor shall be reimbursed for all actual costs incurred for the purpose of performing the omitted contract item prior to the date of the RPR's order. Such additional costs incurred by the Contractor must be directly related to the deleted contract item and shall be supported by certified statements by the Contractor as to the nature the amount of such costs. 90-05 Payment for extra work. Extra work, performed in accordance with Section 40, paragraph 40-04, Extra Work, will be paid for at the contract prices or agreed prices specified in the change order or supplemental agreement authorizing the extra work. General Provisions 00 74 01-43 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 90-06 Partial payments. Partial payments will be made to the Contractor at least once each month as the work progresses. Said payments will be based upon estimates, prepared by the RPR, of the value of the work performed and materials complete and in place, in accordance with the contract, plans, and specifications. Such partial payments may also include the delivered actual cost of those materials stockpiled and stored in accordance with paragraph 90-07, Payment for Materials on Hand. No partial payment will be made when the amount due to the Contractor since the last estimate amounts to less than five hundred dollars. Section 00 52 23 Agreement for amount of retainage. It is understood and agreed that the Contractor shall not be entitled to demand or receive partial payment based on quantities of work in excess of those provided in the proposal or covered by approved change orders or supplemental agreements, except when such excess quantities have been determined by the RPR to be a part of the final quantity for the item of work in question. No partial payment shall bind the Owner to the acceptance of any materials or work in place as to quality or quantity. All partial payments are subject to correction at the time of final payment as provided in paragraph 90-09, Acceptance and Final Payment. The Contractor shall deliver to the Owner a complete release of all claims for labor and material arising out of this contract before the final payment is made. If any subcontractor or supplier fails to furnish such a release in full, the Contractor may furnish a bond or other collateral satisfactory to the Owner to indemnify the Owner against any potential lien or other such claim. The bond or collateral shall include all costs, expenses, and attorney fees the Owner may be compelled to pay in discharging any such lien or claim. 90-07 Payment for materials on hand. Partial payments may be made to the extent of the delivered cost of materials to be incorporated in the work, provided that such materials meet the requirements of the contract, plans, and specifications and are delivered to acceptable sites on the airport property or at other sites in the vicinity that are acceptable to the Owner. Such delivered costs of stored or stockpiled materials may be included in the next partial payment after the following conditions are met: a. The material has been stored or stockpiled in a manner acceptable to the RPR at or on an approved site. b. The Contractor has furnished the RPR with acceptable evidence of the quantity and quality of such stored or stockpiled materials. c.The Contractor has furnished the RPR with satisfactory evidence that the material and transportation costs have been paid. d. The Contractor has furnished the Owner legal title (free of liens or encumbrances of any kind)to the material stored or stockpiled. e. The Contractor has furnished the Owner evidence that the material stored or stockpiled is insured against loss by damage to or disappearance of such materials at any time prior to use in the work. It is understood and agreed that the transfer of title and the Owner's payment for such stored or stockpiled materials shall in no way relieve the Contractor of their responsibility for furnishing and placing such materials in accordance with the requirements of the contract, plans, and specifications. In no case will the amount of partial payments for materials on hand exceed the contract price for such materials or the contract price for the contract item in which the material is intended to be used. No partial payment will be made for stored or stockpiled living or perishable plant materials. The Contractor shall bear all costs associated with the partial payment of stored or stockpiled materials in accordance with the provisions of this paragraph. 90-08 Payment of withheld funds. At the Contractor's option, if an Owner withholds retainage in accordance with the methods described in paragraph 90-06 Partial Payments, the Contractor may request General Provisions 00 74 01-44 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 that the Owner deposit the retainage into an escrow account. The Owner's deposit of retainage into an escrow account is subject to the following conditions: a. The Contractor shall bear all expenses of establishing and maintaining an escrow account and escrow agreement acceptable to the Owner. b.The Contractor shall deposit to and maintain in such escrow only those securities or bank certificates of deposit as are acceptable to the Owner and having a value not less than the retainage that would otherwise be withheld from partial payment. c. The Contractor shall enter into an escrow agreement satisfactory to the Owner. d. The Contractor shall obtain the written consent of the surety to such agreement. 90-09 Acceptance and final payment. When the contract work has been accepted in accordance with the requirements of Section 50, paragraph 50-15, Final Acceptance, the RPR will prepare the final estimate of the items of work actually performed. The Contractor shall approve the RPR's final estimate or advise the RPR of the Contractor's objections to the final estimate which are based on disputes in measurements or computations of the final quantities to be paid under the contract as amended by change order or supplemental agreement.The Contractor and the RPR shall resolve all disputes(if any)in the measurement and computation of final quantities to be paid within 30 calendar days of the Contractor's receipt of the RPR's final estimate. If, after such 30-day period, a dispute still exists, the Contractor may approve the RPR's estimate under protest of the quantities in dispute, and such disputed quantities shall be considered by the Owner as a claim in accordance with Section 50, paragraph 50-16, Claims for Adjustment and Disputes. After the Contractor has approved, or approved under protest,the RPR's final estimate, and after the RPR's receipt of the project closeout documentation required in paragraph 90-11, Contractor Final Project Documentation, final payment will be processed based on the entire sum, or the undisputed sum in case of approval under protest, determined to be due the Contractor less all previous payments and all amounts to be deducted under the provisions of the contract.All prior partial estimates and payments shall be subject to correction in the final estimate and payment. If the Contractor has filed a claim for additional compensation under the provisions of Section 50, paragraph 50-16, Claims forAdjustments and Disputes, or under the provisions of this paragraph, such claims will be considered by the Owner in accordance with local laws or ordinances. Upon final adjudication of such claims, any additional payment determined to be due the Contractor will be paid pursuant to a supplemental final estimate. 90-10 Construction warranty. a. In addition to any otherwarranties in this contract,the Contractor warrants that work performed under this contract conforms to the contract requirements and is free of any defect in equipment, material, workmanship, or design furnished, or performed by the Contractor or any subcontractor or supplier at any tier. b. This warranty shall continue for a period of one year from the date of final acceptance of the work, except as noted. If the Owner takes possession of any part of the work before final acceptance, this warranty shall continue for a period of one year from the date the Owner takes possession. c. The Contractor shall remedy at the Contractor's expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor's expense any damage to Owner real or personal property, when that damage is the result of the Contractor's failure to conform to contract requirements; or any defect of equipment, material, workmanship, or design furnished by the Contractor. d. The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause. The Contractor's warranty with respect to work repaired or replaced will run for one year from the date of repair or replacement. General Provisions 00 74 01-45 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport AC 150/5370-10H CCIA Taxiway Echo Rehabilitation 12/21/2018 e. The Owner will notify the Contractor, in writing, within seven (7) days after the discovery of any failure, defect, or damage. f. If the Contractor fails to remedy any failure, defect, or damage within 14 days after receipt of notice, the Owner shall have the right to replace, repair, or otherwise remedy the failure, defect, or damage at the Contractor's expense. g. With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall: (1) Obtain all warranties that would be given in normal commercial practice; (2) Require all warranties to be executed, in writing,for the benefit of the Owner, as directed by the Owner, and (3) Enforce all warranties for the benefit of the Owner. h. This warranty shall not limit the Owner's rights with respect to latent defects, gross mistakes, or fraud. 90-11 Contractor Final Project Documentation.Approval of final payment to the Contractor is contingent upon completion and submittal of the items listed below. The final payment will not be approved until the RPR approves the Contractor's final submittal. The Contractor shall: a. Provide two (2) copies of all manufacturers warranties specified for materials, equipment, and installations. b. Provide weekly payroll records (not previously received) from the general Contractor and all subcontractors. c. Complete final cleanup in accordance with Section 40, paragraph 40-08, Final Cleanup. d. Complete all punch list items identified during the Final Inspection. e. Provide complete release of all claims for labor and material arising out of the Contract. f. Provide a certified statement signed by the subcontractors, indicating actual amounts paid to the Disadvantaged Business Enterprise (DBE) subcontractors and/or suppliers associated with the project. g. When applicable per state requirements, return copies of sales tax completion forms. h. Manufacturer's certifications for all items incorporated in the work. i. All required record drawings, as-built drawings or as-constructed drawings. j. Project Operation and Maintenance (O&M) Manual(s). k. Security for Construction Warranty. I. Equipment commissioning documentation submitted, if required. END OF SECTION 90 General Provisions 00 74 01-46 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation 00 74 02 SPECIAL PROVISIONS TABLE OF CONTENTS A-01 ACCESS TO RECORDS AND REPORTS A-02 BREACH OF CONTRACT A-03 BUY AMERICAN PREFERENCE A-04 CIVIL RIGHTS - GENERAL A-05 CIVIL RIGHTS—TITLE VI ASSURANCES A-06 CLEAN AIR AND WATER POLLUTION CONTROL A-07 CONTRACT WORK HOURS AND SAFETY STANDARDS A-08 COPELAND "ANTI-KICKBACK"ACT A-09 DAVIS-BACON REQUIREMENTS A-10 DEBARMENT AND SUSPENSION A-11 DISADVANTAGED BUSINESS ENTERPRISE' A-12 DISTRACTED DRIVING A-13 PROHIBITION ON CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT A-14 DRUG FREE WORKPLACE REQUIREMENTS A-15 FEDERAL FAIR LABOR STANDARDS ACT A-16 LOBBYING FEDERAL EMPLOYEES A-17 OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970 A-18 PROCUREMENT OF RECOVERED MATERIALS A-19 RIGHT TO INVENTIONS A-20 SEISMIC SAFETY A-21 TAX DELINQUENCY AND FELONY CONVICTION A-22 TERMINATION OF CONTRACT A-23 TRADE RESTRICTION CERTIFICATION A-24 VETERAN'S PREFERENCE A-25 DOMESTIC PREFERENCES FOR PROCUREMENTS A-26 PROHIBITION OF COVERED UNMANNED AIRCRAFT SYSTEMS (UAS) B. STATE TERMS AND CONDITIONS B-01 PROHIBITION ON CONTRACTS WITH FOREIGN TERRORIST ORGANIZATIONS B-02 PROHIBITION ON CONTRACTS WITH COMPANIES BOYCOTTING ISRAEL B-03 PROHIBITION ON CONTRACTS WITH CERTAIN FOREIGN-OWNED COMPANIES IN CONNECTION WITH CRITICAL INFRASTRUCTURE B-04 PROHIBITION ON CONTRACTS WITH COMPANIES THAT DISCRIMINATE AGAINST FIREARM AND AMMUNITION INDUSTRIES B-05 PROHIBITION ON CONTRACTS WITH COMPANIES BOYCOTTING CERTAIN ENERGY COMPANIES C. LOCAL TERMS AND CONDITIONS—SEE 00 72 00 AND 00 73 00 Special Provisions 00 74 02- 1 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation PAGE INTENTIONALLY LEFT BLANK Special Provisions 00 74 02-2 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation SECTION A—FEDERAL AVIATION ADMINISTRATION REQUIREMENTS A-01 ACCESS TO RECORDS AND REPORTS The Contractor must maintain an acceptable cost accounting system. The Contractor agrees to provide the Owner, the Federal Aviation Administration, and the Comptroller General of the United States or any of their duly authorized representatives access to any books, documents, papers,and records of the Contractor which are directly pertinent to the specific contract for the purpose of making audit, examination, excerpts and transcriptions. The Contractor agrees to maintain all books, records and reports required under this contract for a period of not less than three years after final payment is made and all pending matters are closed. A-02 BREACH OF CONTRACT Any violation or breach of terms of this contract on the part of the contractor or its subcontractors may result in the suspension or termination of this contract or such other action that may be necessary to enforce the rights of the parties of this agreement. Owner will provide contractor written notice that describes the nature of the breach and corrective actions the contractor must undertake in order to avoid termination of the contract. Owner reserves the right to withhold payments to Contractor until such time the Contractor corrects the breach or the Owner elects to terminate the contract. The Owner's notice will identify a specific date by which the contractor must correct the breach. Owner may proceed with termination of the contract if the contractor fails to correct the breach by deadline indicated in the Owner's notice. The duties and obligations imposed by the Contract Documents and the rights and remedies available thereunder are in addition to, and not a limitation of, any duties, obligations, rights and remedies otherwise imposed or available by law. A-03 BUY AMERICAN PREFERENCES The Contractor certifies that its bid/offer is in compliance with 49 USC § 50101, BABA and other related Made in America Laws, U.S. statutes, guidance, and FAA policies,which provide that Federal funds may not be obligated unless all iron, steel and manufactured goods used in AIP funded projects are produced in the United States, unless the Federal Aviation Administration has issued a waiver for the product; the product is listed as an Excepted Article, Material Or Supply in Federal Acquisition Regulation subpart 25.108; or is included in the FAA Nationwide Buy American Waivers Issued list. The bidder or offeror must complete and submit the certification of compliance with FAA's Buy American Preference, BABA and Made in America laws included herein with their bid or offer. The Airport Sponsor/Owner will reject as nonresponsive any bid or offer that does not include a completed certification of compliance with FAA's Buy American Preference and BABA. The bidder or offeror certifies that all constructions materials, defined to mean an article, material, or supply other than an item of primarily iron or steel; a manufactured product; cement and cementitious materials; aggregates such as stone, sand, or gravel; or aggregate binding agents or additives that are or consist primarily of: non-ferrous metals; plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables); glass (including optic glass); lumber; or drywall used in the project are manufactured in the U.S. The bidder or offeror certifies procurement of certain rolling stock using FAA grant funds will prohibit airports from using Federal financial assistance to procure buses or rail car vehicle rolling stock from covered entities. See Section 00 45 46 "Bidder Certifications"for Contractor Buy American Certification. Special Provisions 00 74 02-3 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation A-04 CIVIL RIGHTS—GENERAL In all its activities within the scope of its airport program,the Contractor agrees to comply with pertinent statutes, Executive Orders,and such rules as identified in Title VI List of Pertinent Nondiscrimination Acts and Authorities to ensure that no person shall, on the grounds of race, color, national origin, creed, sex, age, or disability be excluded from participating in any activity conducted with or benefiting from Federal assistance. This provision is in addition to that required by Title VI of the Civil Rights Act of 1964. This provision binds the Contractor and subcontractors from the bid solicitation period through the completion of the contract. A-05 CIVIL RIGHTS—TITLE VI ASSURANCES Title VI Solicitation Notice: As a condition of a grant award, the Sponsor shall demonstrate that it complies with the provisions of Title VI of the Civil Rights Act of 1964 (42 U.S.C. §§ 2000d et seq) and implementing regulations (49 CFR part 21) including amendments thereto, the Airport and Airway Improvement Act of 1982 (49 U.S.C. §47123), the Age Discrimination Act of 1975 (42 U.S.C. 6101 et seq.), Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. § 794 et seq.), the Americans with Disabilities Act of 1990 (42 U.S.C. § 12101, et seq.), U.S. Department of Transportation and Federal Aviation Administration (FAA)Assurances, and other relevant civil rights statutes, regulations, or authorities, including any amendments or updates thereto. This may include, as applicable, providing a current Title VI Program Plan to the FAA for approval, in the format and according to the timeline required by the FAA, and other information about the communities that will be benefited and impacted by the project. A completed FAA Title VI Pre-Grant Award Checklist is required for every grant application, unless excused by the FAA. The Sponsor shall affirmatively ensure that when carrying out any project supported by this grant that it complies with all federal nondiscrimination and civil rights laws based on race, color, national origin, sex, creed, age, disability, genetic information, in consideration for federal financial assistance. The Department's and FAA's Office of Civil Rights may provide resources and technical assistance to recipients to ensure full and sustainable compliance with Federal civil rights requirements. Failure to comply with civil rights requirements will be considered a violation of the agreement or contract and be subject to any enforcement action as authorized by law. Title VI List of Pertinent Nondiscrimination Acts and Authorities: During the performance of this contract, the Contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the"Contractor")agrees to comply with the following non-discrimination statutes and authorities; including but not limited to: • Title VI of the Civil Rights Act of 1964(42 U.S.C. §2000d et seq., 78 stat. 252)(prohibits discrimination on the basis of race, color, national origin); • 49 CFR Part 21 (Non-discrimination in Federally-Assisted programs of the Department of Transportation—Effectuation of Title VI of the Civil Rights Act of 1964) including amendments thereto; • The Uniform Relocation Assistance and Real Property Acquisition Policies Act of 1970, (42 U.S.C. § 4601) (prohibits unfair treatment of persons displaced or whose property has been acquired because of Federal or Federal-aid programs and projects); • Section 504 of the Rehabilitation Act of 1973 (29 U.S.C. § 794 et seq.), as amended (prohibits discrimination on the basis of disability); and 49 CFR part 27 (Nondiscrimination on the Basis of Disability in Programs or Activities Receiving Federal Financial Assistance); • The Age Discrimination Act of 1975, as amended (42 .U.S.C. §6101 et seq.) (prohibits discrimination on the basis of age); Special Provisions 00 74 02-4 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation • Airport and Airway Improvement Act of 1982 (49 U.S.C. § 47123), as amended (prohibits discrimination based on race, creed, color, national origin, or sex); • The Civil Rights Restoration Act of 1987 (P.L. 100-259) (broadened the scope, coverage and applicability of Title VI of the Civil Rights Act of 1964, the Age Discrimination Act of 1975 and Section 504 of the Rehabilitation Act of 1973, by expanding the definition of the terms"programs or activities" to include all of the programs or activities of the Federal-aid recipients, sub-recipients and contractors, whether such programs or activities are Federally funded or not); • Titles II and III of the Americans with Disabilities Act of 1990 (42 U.S.C. § 12101, et seq) (prohibit discrimination on the basis of disability in the operation of public entities, public and private transportation systems, places of public accommodation, and certain testing entities)as implemented by U.S. Department of Transportation regulations at 49 CFR Parts 37 and 38; • Title IX of the Education Amendments of 1972, as amended, which prohibits you from discriminating because of sex in education programs or activities (20 U.S.C. § 1681, et seq). Compliance with Nondiscrimination Requirements: During the performance of this contract, the contractor, for itself, its assignees, and successors in interest (hereinafter referred to as the"Contractor")agrees as follows: 1. Compliance with Regulations: The contractor(hereinafter includes consultants)will comply with the Title VI List of Pertinent Nondiscrimination Acts and Authorities,as they may be amended from time to time, which are herein incorporated by reference and made a part of this contract. 2. Nondiscrimination: The Contractor, with regard to the work performed by it during the contract, will not discriminate on the grounds of race, color, national origin, creed, sex, age, or disability in the selection and retention of subcontractors, including procurements of materials and leases of equipment. The Contractor will not participate directly or indirectly in the discrimination prohibited by the Nondiscrimination Acts and Authorities, including employment practices when the contract covers any activity, project, or program set forth in Appendix B of 49 CFR part 21 including amendments thereto. 3. Solicitations for Subcontracts, Including Procurements of Materials and Equipment: In all solicitations, either by competitive bidding or negotiation made by the Contractor for work to be performed under a subcontract, including procurements of materials, or leases of equipment, each potential subcontractor or supplier will be notified by the Contractor of the contractor's obligations under this contract and the Nondiscrimination Acts And Authorities on the grounds of race, color, or national origin. 4. Information and Reports: The Contractor will provide all information and reports required by the Acts, the Regulations, and directives issued pursuant thereto and will permit access to its books, records, accounts, other sources of information, and its facilities as may be determined by the Sponsor or the Federal Aviation Administration to be pertinent to ascertain compliance with such Nondiscrimination Acts and Authorities and instructions. Where any information required of a contractor is in the exclusive possession of another who fails or refuses to furnish the information, the Contractor will so certify to the Sponsor or the Federal Aviation Administration, as appropriate, and will set forth what efforts it has made to obtain the information. 5. Sanctions for Noncompliance: In the event of a Contractor's noncompliance with the non- discrimination provisions of this contract, the Sponsor will impose such contract sanctions as it or the Federal Aviation Administration may determine to be appropriate, including, but not limited to: a. Withholding payments to the Contractor under the contract until the Contractor complies; and/or b. Cancelling, terminating, or suspending a contract, in whole or in part. Special Provisions 00 74 02-5 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation 6. Incorporation of Provisions:The Contractor will include the provisions of paragraphs one through six in every subcontract, including procurements of materials and leases of equipment, unless exempt by the Acts, the Regulations, and directives issued pursuant thereto. The Contractor will take action with respect to any subcontract or procurement as the Sponsor or the Federal Aviation Administration may direct as a means of enforcing such provisions including sanctions for noncompliance. Provided,that if the Contractor becomes involved in, or is threatened with litigation by a subcontractor, or supplier because of such direction,the Contractor may request the Sponsor to enter into any litigation to protect the interests of the Sponsor. In addition, the Contractor may request the United States to enter into the litigation to protect the interests of the United States. A-06 CLEAN AIR AND WATER POLLUTION CONTROL Contractor agrees to comply with all applicable standards, orders, and regulations issued pursuant to the Clean Air Act (42 U.S.C. §§ 7401-7671q) and the Federal Water Pollution Control Act as amended (33 U.S.C. §§ 1251-1387). The Contractor agrees to report any violation to the Owner immediately upon discovery. The Owner assumes responsibility for notifying the Environmental Protection Agency (EPA) and the Federal Aviation Administration. Contractor must include this requirement in all subcontracts that exceed $150,000. A-07 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT REQUIREMENTS 1. Overtime Requirements No contractor or subcontractor contracting for any part of the contract work which may require or involve the employment of laborers or mechanics shall require or permit any such laborer or mechanic, including watchmen and guards, in any workweek in which he or she is employed on such work to work in excess of forty hours in such workweek unless such laborer or mechanic receives compensation at a rate not less than one and one-half times the basic rate of pay for all hours worked in excess of forty hours in such workweek. 2. Violation; Liability for Unpaid Wages; Liquidated Damages In the event of any violation of the clause set forth in paragraph (1)of this clause, the Contractor and any subcontractor responsible therefore shall be liable for the unpaid wages. In addition, such contractor and subcontractor shall be liable to the United States (in the case of work done under contract for the District of Columbia or a territory, to such District or to such territory), for liquidated damages. Such liquidated damages shall be computed with respect to each individual laborer or mechanic, including watchmen and guards, employed in violation of the clause set forth in paragraph (1) of this clause, in the sum of$29 for each calendar day on which such individual was required or permitted to work in excess of the standard workweek of forty hours without payment of the overtime wages required by the clause set forth in paragraph (1)of this clause. 3. Withholding for Unpaid Wages and Liquidated Damages. The Federal Aviation Administration (FAA) or the Owner shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld, from any moneys payable on account of work performed by the contractor or subcontractor under any such contract or any other Federal contract with the same prime contractor, or any other federally- assisted contract subject to the Contract Work Hours and Safety Standards Act, which is held by the same prime contractor, such sums as may be determined to be necessary to satisfy any liabilities of Special Provisions 00 74 02-6 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation such contractor or subcontractor for unpaid wages and liquidated damages as provided in the clause set forth in paragraph (2)of this clause. 4. Subcontractors. The Contractor or subcontractor shall insert in any subcontracts the clauses set forth in paragraphs(1) through (4) and also a clause requiring the subcontractor to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for compliance by any subcontractor or lower tier subcontractor with the clauses set forth in paragraphs (1)through (4)of this clause. A-08 COPELAND "ANTI-KICKBACK" ACT Contractor must comply with the requirements of the Copeland "Anti-Kickback" Act (18 USC 874 and 40 USC 3145), as supplemented by Department of Labor regulation 29 CFR part 3. Contractor and subcontractors are prohibited from inducing, by any means, any person employed on the project to give up any part of the compensation to which the employee is entitled. The Contractor and each Subcontractor must submit to the Owner, a weekly statement on the wages paid to each employee performing on covered work during the prior week. Owner must report any violations of the Act to the Federal Aviation Administration. A-09 DAVIS-BACON REQUIREMENTS 1. Minimum Wages (i) All laborers and mechanics employed or working upon the site of the work will be paid unconditionally and not less often than once a week,and without subsequent deduction or rebate on any account(except such payroll deductions as are permitted by the Secretary of Labor under regulations implementing the Copeland Act(29 CFR Part 3)),the full amount of wages and bona fide fringe benefits (or cash equivalent thereof) due at time of payment computed at rates not less than those contained in the wage determination of the Secretary of Labor which is attached hereto and made a part hereof, regardless of any contractual relationship which may be alleged to exist between the Contractor and such laborers and mechanics. Contributions made or costs reasonably anticipated for bona fide fringe benefits under section 1(b)(2)of the Davis-Bacon Act on behalf of laborers or mechanics are considered wages paid to such laborers or mechanics, subject to the provisions of paragraph (1)(iv) of this section; also, regular contributions made or costs incurred for more than a weekly period (but not less often than quarterly) under plans, funds, or programs which cover the particular weekly period, are deemed to be constructively made or incurred during such weekly period. Such laborers and mechanics shall be paid the appropriate wage rate and fringe benefits on the wage determination for the classification of work actually performed, without regard to skill, except as provided in 29 CFR§5.5(a)(4). Laborers or mechanics performing work in more than one classification may be compensated at the rate specified for each classification for the time actually worked therein: Provided, that the employer's payroll records accurately set forth the time spent in each classification in which work is performed. The wage determination (including any additional classification and wage rates conformed under(1)(ii)of this section) and the DavisBacon poster (WH-1321)shall be posted at all times by the Contractor and its subcontractors at the site of the work in a prominent and accessible place where it can easily be seen by the workers. (A) The contracting officer shall require that any class of laborers or mechanics, including helpers, which is not listed in the wage determination and which is to be employed under the contract shall be classified in conformance with the wage determination. The contracting officer shall approve an additional classification and wage rate and fringe benefits therefore only when the following criteria have been met: Special Provisions 00 74 02-7 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation (1) The work to be performed by the classification requested is not performed by a classification in the wage determination; (2) The classification is utilized in the area by the construction industry; and (3) The proposed wage rate, including any bona fide fringe benefits, bears a reasonable relationship to the wage rates contained in the wage determination. (B) If the Contractor and the laborers and mechanics to be employed in the classification (if known), or their representatives, and the contracting officer agree on the classification and wage rate(including the amount designated for fringe benefits where appropriate), a report of the action taken shall be sent by the contracting officer to the Administrator of the Wage and Hour Division, U.S. Department of Labor, Washington, DC 20210. The Administrator, or an authorized representative, will approve, modify, or disapprove every additional classification action within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary. (C) In the event the Contractor,the laborers,or mechanics to be employed in the classification, or their representatives, and the contracting officer do not agree on the proposed classification and wage rate (including the amount designated for fringe benefits, where appropriate), the contracting officer shall refer the questions, including the views of all interested parties and the recommendation of the contracting officer, to the Administrator for determination. The Administrator, or an authorized representative, will issue a determination within 30 days of receipt and so advise the contracting officer or will notify the contracting officer within the 30-day period that additional time is necessary. (D) The wage rate (including fringe benefits where appropriate) determined pursuant to subparagraphs (1)(ii) (B) or (C) of this paragraph, shall be paid to all workers performing work in the classification under this contract from the first day on which work is performed in the classification. (iii) Whenever the minimum wage rate prescribed in the contract for a class of laborers or mechanics includes a fringe benefit which is not expressed as an hourly rate, the contractor shall either pay the benefit as stated in the wage determination or shall pay another bona fide fringe benefit or an hourly cash equivalent thereof. (iv) If the contractor does not make payments to a trustee or other third person, the contractor may consider as part of the wages of any laborer or mechanic the amount of any costs reasonably anticipated in providing bona fide fringe benefits under a plan or program, Provided, That the Secretary of Labor has found, upon the written request of the Contractor, that the applicable standards of the Davis-Bacon Act have been met. The Secretary of Labor may require the contractor to set aside in a separate account assets for the meeting of obligations under the plan or program. 2. Withholding. The Federal Aviation Administration or the Sponsor shall upon its own action or upon written request of an authorized representative of the Department of Labor withhold or cause to be withheld from the Contractor under this contract or any other Federal contract with the same prime contractor, or any other federally-assisted contract subject to Davis-Bacon prevailing wage requirements, which is held by the same prime contractor, so much of the accrued payments or advances as may be considered necessary to pay laborers and mechanics, including apprentices, trainees, and helpers, employed by the Contractor or any subcontractor the full amount of wages required by the contract. In the event of failure to pay any laborer or mechanic, including any apprentice,trainee,or helper, employed or working on the site of the work, all or part of the wages required by the contract, the Federal Aviation Administration may, after written notice to the Special Provisions 00 74 02-8 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation Contractor, Sponsor, Applicant, or Owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds until such violations have ceased. 3. Payrolls and basic records (i) Payrolls and basic records relating thereto shall be maintained by the Contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address,and social security number of each such worker; his or her correct classification; hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 1(b)(2)(B)of the Davis-Bacon Act); daily and weekly number of hours worked; deductions made; and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B) of the Davis-Bacon Act, the Contractor shall maintain records that show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual costs incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs and basic records relating thereto shall be maintained by the contractor during the course of the work and preserved for a period of three years thereafter for all laborers and mechanics working at the site of the work. Such records shall contain the name, address,and social security number of each such worker, his or her correct classification, hourly rates of wages paid (including rates of contributions or costs anticipated for bona fide fringe benefits or cash equivalents thereof of the types described in 1(b)(2)(B)of the Davis-Bacon Act); daily and weekly number of hours worked, deductions made and actual wages paid. Whenever the Secretary of Labor has found under 29 CFR 5.5(a)(1)(iv) that the wages of any laborer or mechanic include the amount of any costs reasonably anticipated in providing benefits under a plan or program described in section 1(b)(2)(B)of the Davis-Bacon Act, the contractor shall maintain records which show that the commitment to provide such benefits is enforceable, that the plan or program is financially responsible, and that the plan or program has been communicated in writing to the laborers or mechanics affected, and records which show the costs anticipated or the actual costs incurred in providing such benefits. Contractors employing apprentices or trainees under approved programs shall maintain written evidence of the registration of apprenticeship programs and certification of trainee programs, the registration of the apprentices and trainees, and the ratios and wage rates prescribed in the applicable programs. (A) The Contractor shall submit weekly for each week in which any contract work is performed a copy of all payrolls to the Federal Aviation Administration if the agency is a party to the contract, but if the agency is not such a party, the Contractor will submit the payrolls to the applicant, Sponsor, or Owner, as the case may be, for transmission to the Federal Aviation Administration. The payrolls submitted shall set out accurately and completely all of the information required to be maintained under 29 CFR § 5.5(a)(3)(i), except that full social security numbers and home addresses shall not be included on weekly transmittals. Instead, the payrolls shall only need to include an individually identifying number for each employee (e.g., the last four digits of the employee's social security number). The required weekly payroll information may be submitted in any form desired. Optional Form WH-347 is available for this purpose from the Wage and Hour Special Provisions 00 74 02-9 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation Division Web site at https://www.dol.gov/agencies/whd/government- contracts/construction/payroll-certification or its successor site. The prime contractor is responsible for the submission of copies of payrolls by all subcontractors. Contractors and subcontractors shall maintain the full social security number and current address of each covered worker and shall provide them upon request to the Federal Aviation Administration if the agency is a party to the contract, but if the agency is not such a party, the Contractor will submit them to the applicant, Sponsor, or Owner, as the case may be, for transmission to the Federal Aviation Administration, the Contractor, or the Wage and Hour Division of the Department of Labor for purposes of an investigation or audit of compliance with prevailing wage requirements. It is not a violation of this section for a prime contractor to require a subcontractor to provide addresses and social security numbers to the prime contractor for its own records, without weekly submission to the sponsoring government agency (or the applicant, Sponsor, or Owner). (B) Each payroll submitted shall be accompanied by a"Statement of Compliance,"signed by the Contractor or subcontractor or his or her agent who pays or supervises the payment of the persons employed under the contract and shall certify the following: (1) That the payroll for the payroll period contains the information required to be provided under 29 CFR § 5.5(a)(3)(ii), the appropriate information is being maintained under 29 CFR § 5.5 (a)(3)(i) and that such information is correct and complete; (2) That each laborer and mechanic (including each helper, apprentice and trainee) employed on the contract during the payroll period has been paid the full weekly wages earned, without rebate, either directly or indirectly, and that no deductions have been made either directly or indirectly from the full wages earned, other than permissible deductions as set forth in Regulations 29 CFR Part 3; (3) That each laborer or mechanic has been paid not less than the applicable wage rates and fringe benefits or cash equivalents for the classification of work performed, as specified in the applicable wage determination incorporated into the contract. (C) The weekly submission of a properly executed certification set forth on the reverse side of Optional Form WH-347 shall satisfy the requirement for submission of the "Statement of Compliance" required by paragraph (3)(ii)(B) of this section. (D) The falsification of any of the above certifications may subject the Contractor or subcontractor to civil or criminal prosecution under Section 1001 of Title 18 and Section 231 of the United States Code. (iii) The contractor or subcontractor shall make the records required under paragraph (3)(i) of this section available for inspection, copying or transcription by authorized representatives of the sponsor, the Federal Aviation Administration, or the Department of Labor, and shall permit such representatives to interview employees during working hours on the job. If the contractor or subcontractor fails to submit the required records or to make them available, the Federal agency may, after written notice to the contractor, sponsor, applicant or owner, take such action as may be necessary to cause the suspension of any further payment, advance, or guarantee of funds. Furthermore, failure to submit the required records upon request or to make such records available may be grounds for debarment action pursuant to 29 CFR § 5.12. 4. Apprentices and Trainees (i) Apprentices.Apprentices will be permitted to work at less than the predetermined rate for the work they performed when they are employed pursuant to and individually registered in a bona fide apprenticeship program registered with the U.S. Department of Labor, Special Provisions 00 74 02- 10 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation Employment and Training Administration, Office of Apprenticeship Training, Employer and Labor Services, or with a State Apprenticeship Agency recognized by the Office, or if a person is employed in his or her first 90 days of probationary employment as an apprentice in such an apprenticeship program, who is not individually registered in the program, but who has been certified by the Office of Apprenticeship Training, Employer and Labor Services or a State Apprenticeship Agency (where appropriate) to be eligible for probationary employment as an apprentice. The allowable ratio of apprentices to journeymen on job site in any craft classification shall not be greater than the ratio permitted to the contractor as to the entire work force under the registered program. Any worker listed on a payroll at an apprentice wage rate, who is not registered or otherwise employed as stated above, shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any apprentice performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. Where a contractor is performing construction on a project in a locality other than that in which its program is registered, the ratios and wage rates (expressed in percentages of the journeyman's hourly rate) specified in the Contractor's or subcontractor's registered program shall be observed. Every apprentice must be paid at not less than the rate specified in the registered program for the apprentice's level of progress, expressed as a percentage of the journeymen hourly rate specified in the applicable wage determination. Apprentices shall be paid fringe benefits in accordance with the provisions of the apprenticeship program. If the apprenticeship program does not specify fringe benefits, apprentices must be paid the full amount of fringe benefits listed on the wage determination for the applicable classification. If the Administrator determines that a different practice prevails for the applicable apprentice classification, fringes shall be paid in accordance with that determination. In the event the Office of Apprenticeship Training, Employer and Labor Services, or a State Apprenticeship Agency recognized by the Office,withdraws approval of an apprenticeship program, the Contractor will no longer be permitted to utilize apprentices at less than the applicable predetermined rate for the work performed until an acceptable program is approved. (ii) Trainees. Except as provided in 29 CFR § 5.16, trainees will not be permitted to work at less than the predetermined rate for the work performed unless they are employed pursuant to and individually registered in a program which has received prior approval, evidenced by formal certification by the U.S. Department of Labor, Employment and Training Administration. The ratio of trainees to journeymen on the job site shall not be greater than permitted under the plan approved by the Employment and Training Administration. Every trainee must be paid at no less than the rate specified in the approved program for the trainee's level of progress, expressed as a percentage of the journeyman hourly rate specified in the applicable wage determination. Trainees shall be paid fringe benefits in accordance with the provisions of the trainee program. If the trainee program does not mention fringe benefits, trainees shall be paid the full amount of fringe benefits listed on the wage determination unless the Administrator of the Wage and Hour Division determines that there is an apprenticeship program associated with the corresponding journeyman wage rate on the wage determination that provides for less than full fringe benefits for apprentices. Any employee listed on the payroll at a trainee rate that is not registered and participating in a training plan approved by the Employment and Training Administration shall be paid not less than the applicable wage rate on the wage determination for the classification of work actually performed. In addition, any trainee performing work on the job site in excess of the ratio permitted under the registered program shall be paid not less than the applicable wage rate on the wage determination for the work actually performed. In the event the Employment and Training Administration withdraws approval of a training program, the Contractor will no longer be permitted to utilize trainees at less than the applicable predetermined rate for the work performed until an acceptable program is approved. Special Provisions 00 74 02- 11 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation 5. Compliance with Copeland Act Requirements. The contractor shall comply with the requirements of 29 CFR Part 3, which are incorporated by reference in this contract. 6. Subcontracts. The contractor or subcontractor shall insert in any subcontracts the clauses contained in 29 CFR §§ 5.5(a)(1) through (10) and such other clauses as the Federal Aviation Administration may by appropriate instructions require, and also a clause requiring the subcontractors to include these clauses in any lower tier subcontracts. The prime contractor shall be responsible for the compliance by any subcontractor or lower tier subcontractor with all the contract clauses in 29 CFR § 5.5. 7. Contract Termination: Debarment. A breach of the contract clauses in paragraph 1 through 10 of this section may be grounds for termination of the contract, and for debarment as a contractor and a subcontractor as provided in 29 CFR § 5.12. 8. Compliance with the Davis-Bacon and Related Act Requirements All rulings and interpretations of the Davis-Bacon and Related Acts contained in 29 CFR Parts 1, 3, and 5 are herein incorporated by reference in this contract. 9. Disputes Concerning Labor Standards Disputes arising out of the labor standards provisions of this contract shall not be subject to the general disputes clause of this contract. Such disputes shall be resolved in accordance with the procedures of the Department of Labor set forth in 29 CFR Parts 5, 6 and 7. Disputes within the meaning of this clause include disputes between the contractor(or any of its subcontractors)and the contracting agency, the U.S. Department of Labor, or the employees or their representatives. 10. Certification of Eligibility (i) By entering into this contract,the contractor certifies that neither it(nor he or she)nor any person or firm who has an interest in the contractor's firm is a person or firm ineligible to be awarded Government contracts by virtue of section 3(a)of the Davis-Bacon Act or 29 CFR § 5.12(a)(1). (ii) No part of this contract shall be subcontracted to any person or firm ineligible for award of a Government contract by virtue of section 3(a) of the Davis-Bacon Act or 29 CFR § 5.12(a)(1). (iii) The penalty for making false statements is prescribed in the U.S. Criminal Code, 18USC § 1001. A-10 DEBARMENT AND SUSPENSION CERTIFICATION OF OFFERER/BIDDER REGARDING DEBARMENT: By submitting a bid/proposal under this solicitation, the bidder or offeror certifies that neither it nor its principals are presently debarred or suspended by any Federal department or agency from participation in this transaction. Special Provisions 00 74 02- 12 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation CERTIFICATION OF LOWER TIER CONTRACTORS REGARDING DEBARMENT: The successful bidder, by administering each lower tier subcontract that exceeds $25,000 as a "covered transaction", must verify each lower tier participant of a "covered transaction" under the project is not presently debarred or otherwise disqualified from participation in this federally assisted project. The successful bidder will accomplish this by: 1. Checking the System for Award Management at website: http://www.sam.gov 2. Collecting a certification statement similar to the Certificate Regarding Debarment and Suspension (Bidder or Offeror), above. 3. Inserting a clause or condition in the covered transaction with the lower tier contract If the FAA later determines that a lower tier participant failed to disclose to a higher tire participant that it was excluded or disqualified at the time it entered the covered transaction, the FAA may pursue any available remedies, including suspension and debarment of the non-compliant participant. A-11 DISADVANTAGED BUSINESS ENTERPRISE The Contractor, subrecipient or subcontractor shall not discriminate on the basis of race, color, national origin, or sex in the performance of this contract. The Contractor shall carry out applicable requirements of 49 CFR Part 26, including any amendments thereto, in the award and administration of DOT-assisted contracts. Failure by the Contractor to carry out these requirements is a material breach of this contract, which may result in the termination of this contract or such other remedy as the recipient deems appropriate, which may include, but is not limited to: 1) Withholding monthly progress payments; 2) Assessing sanctions; 3) Liquidated damages; and/or 4) Disqualifying the Contractor from future bidding as non-responsible. Prompt Payment(49 CFR 26.29) The prime contractor agrees to pay each subcontractor under this prime contract for satisfactory performance of its contract no later than 30 days from the receipt of each payment the prime contractor receives from the Owner. The prime contractor agrees further to return retainage payments to each subcontractor within 30 days after the subcontractor's work is satisfactorily completed. Any delay or postponement of payment from the above referenced time frame may occur only for good cause following written approval of the Owner. This clause applies to both DBE and non-DBE subcontractors. Termination of DBE Subcontracts (49 CFR � 26.53) The prime contractor must not terminate a DBE subcontractor listed in bid (or an approved substitute DBE firm)without prior written consent of the Owner. This includes, but is not limited to, instances in which the prime contractor seeks to perform work originally designated for a DBE subcontractor with its own forces or those of an affiliate, a non-DBE firm, or with another DBE firm. The prime contractor shall utilize the specific DBEs listed to perform the work and supply the materials for which each is listed unless the contractor obtains written consent from the Owner. Unless the Owner consent is provided, the prime contractor shall not be entitled to any payment for work or material unless it is performed or supplied by the listed DBE. The Owner may provide such written consent only if the Owner agrees, for reasons stated in the concurrence document,that the prime contractor has good cause to terminate the DBE firm. For purposes of this paragraph, good cause includes the circumstances listed in 49 CFR§26.53. Special Provisions 00 74 02- 13 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation Before transmitting to the Owner its request to terminate and/or substitute a DBE subcontractor,the prime contractor must give notice in writing to the DBE subcontractor, with a copy to the Owner, of its intent to request to terminate and/or substitute, and the reason for the request. The prime contractor must give the DBE five days to respond to the prime contractor's notice and advise the Owner and the contractor of the reasons, if any, why it objects to the proposed termination of its subcontract and why the Owner should not approve the prime contractor's action. If required in a particular case as a matter of public necessity(e.g., safety), the Owner may provide a response period shorter than five days. In addition to post-award terminations, the provisions of this section apply to pre-award deletions of or substitutions for DBE firms put forward by offerors in negotiated procurements. A-12 DISTRACTED DRIVING In accordance with Executive Order 13513, "Federal Leadership on Reducing Text Messaging While Driving", (10/1/2009) and DOT Order 3902.10, "Text Messaging While Driving", (12/30/2009), the Federal Aviation Administration encourages recipients of Federal grant funds to adopt and enforce safety policies that decrease crashes by distracted drivers, including policies to ban text messaging while driving when performing work related to a grant or subgrant. In support of this initiative, the Owner encourages the Contractor to promote policies and initiatives for its employees and other work personnel that decrease crashes by distracted drivers, including policies that ban text messaging while driving motor vehicles while performing work activities associated with the project. The Contractor must include the substance of this clause in all sub-tier contracts exceeding $10,000 that involve driving a motor vehicle in performance of work activities associated with the project. A-13 PROHIBITION ON CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT Contractor and Subcontractor agree to comply with mandatory standards and policies relating to use and procurement of certain telecommunications and video surveillance services or equipment in compliance with the National Defense Authorization Act Public Law 115-232 § 889(f)(1). A-14 DRUG FREE WORKPLACE REQUIREMENTS This provision applies to all AIP funded projects, but not to the contracts between the grantee (the Sponsor) and a contractor, subcontractors, suppliers, or subgrantees. A-15 FEDERAL FAIR WORKPLACE REQUIREMENTS All contracts and subcontracts that result from this solicitation incorporate by reference the provisions of 29 CFR part 201, et seq, the Federal Fair Labor Standards Act(FLSA), with the same force and effect as if given in full text. The FLSA sets minimum wage,overtime pay, recordkeeping,and child labor standards for full and part time workers. The Contractor has full responsibility to monitor compliance to the referenced statute or regulation. The Contractor must address any claims or disputes that arise from this requirement directly with the U.S. Department of Labor—Wage and Hour Division. A-16 LOBBYING FEDERAL EMPLOYEES The bidder or offeror certifies by signing and submitting this bid or proposal, to the best of his or her knowledge and belief, that: Special Provisions 00 74 02- 14 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation (1) No Federal appropriated funds have been paid or will be paid, by or on behalf of the Bidder or Offeror, to any person for influencing or attempting to influence an officer or employee of an agency,a Member of Congress, an officer or employee of Congress,or an employee of a Member of Congress in connection with the awarding of any Federal contract, the making of any Federal grant, the making of any Federal loan, the entering into of any cooperative agreement, and the extension, continuation, renewal, amendment, or modification of any Federal contract, grant, loan, or cooperative agreement. (2) If any funds other than Federal appropriated funds have been paid or will be paid to any person for influencing or attempting to influence an officer or employee of any agency, a Member of Congress, an officer or employee of Congress, or an employee of a Member of Congress in connection with this Federal contract, grant, loan, or cooperative agreement, the undersigned shall complete and submit Standard Form-LLL, "Disclosure Form to Report Lobbying," in accordance with its instructions. (3) The undersigned shall require that the language of this certification be included in the award documents for all sub-awards at all tiers (including subcontracts, subgrants, and contracts under grants, loans, and cooperative agreements) and that all sub-recipients shall certify and disclose accordingly. This certification is a material representation of fact upon which reliance was placed when this transaction was made or entered into. Submission of this certification is a prerequisite for making or entering into this transaction imposed by 31 U.S.C. § 1352. Any person who fails to file the required certification shall be subject to a civil penalty of not less than $10,000 and not more than $100,000 for each such failure. A-17 OCCUPATIONAL SAFETY AND HEALTH ACT All contracts and subcontracts that result from this solicitation incorporate by reference the requirements of 29 CFR Part 1910 with the same force and effect as if given in full text. The employer must provide a work environment that is free from recognized hazards that may cause death or serious physical harm to the employee. The employer retains full responsibility to monitor its compliance and their subcontractor's compliance with the applicable requirements of the Occupational Safety and Health Act of 1970 (29 CFR Part 1910). The employer must address any claims or disputes that pertain to a referenced requirement directly with the U.S. Department of Labor— Occupational Safety and Health Administration. A-18 PROCUREMENT OF RECOVERED MATERIALS Contractor and subcontractor agree to comply with Section 6002 of the Solid Waste Disposal Act, as amended by the Resource Conservation and Recovery Act, and the regulatory provisions of 40 CFR Part 247. In the performance of this contract and to the extent practicable, the Contractor and subcontractors are to use products containing the highest percentage of recovered materials for items designated by the Environmental Protection Agency (EPA) under 40 CFR Part 247 whenever: 1) The contract requires procurement of$10,000 or more of a designated item during the fiscal year; or 2) The contractor has procured $10,000 or more of a designated item using Federal funding during the previous fiscal year. Special Provisions 00 74 02- 15 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation The list of EPA-designated items is available at www.epa.gov/smm/comprehensive-procurement- guidelines-construction-products. Section 6002(c) establishes exceptions to the preference for recovery of EPA-designated products if the contractor can demonstrate the item is: a) Not reasonably available within a timeframe providing for compliance with the contract performance schedule; b) Fails to meet reasonable contract performance requirements; or c) Is only available at an unreasonable price. A-19 RIGHT TO INVENTIONS Contracts or agreements that include the performance of experimental, developmental, or research work must provide for the rights of the Federal Government and the Owner in any resulting invention as established by 37 CFR part 401, Rights to Inventions Made by Non-profit Organizations and Small Business Firms under Government Grants, Contracts, and Cooperative Agreements. This contract incorporates by reference the patent and inventions rights as specified within 37 CFR§401.14. Contractor must include this requirement in all sub-tier contracts involving experimental, developmental, or research work. A-20 SEISMIC SAFETY The Contractor agrees to ensure that all work performed under this contract, including work performed by subcontractors, conforms to a building code standard that provides a level of seismic safety substantially equivalent to standards established by the National Earthquake Hazards Reduction Program (NEHRP). Local building codes that model their code after the current version of the International Building Code (IBC) meet the NEHRP equivalency level for seismic safety. A-21 TAX DELINQUENCY AND FELONY CONVICTION The Contractor shall be required to complete the certification regarding tax delinquency and felony convictions included in these contract documents. Felony conviction: Felony conviction means a conviction within the preceding twenty four(24) months of a felony criminal violation under any Federal law and includes conviction of an offense defined in a section of the U.S. Code that specifically classifies the offense as a felony and conviction of an offense that is classified as a felony under 18 USC § 3559. Tax Delinquency: A tax delinquency is any unpaid Federal tax liability that has been assessed, for which all judicial and administrative remedies have been exhausted, or have lapsed, and that is not being paid in a timely manner pursuant to an agreement with the authority responsible for collecting the tax liability. A-22 TERMINATION OF CONTRACT Termination for Convenience: The Owner may terminate this contract in whole or in part at any time by providing written notice to the Contractor. Such action may be without cause and without prejudice to any other right or remedy of Owner. Upon receipt of a written notice of termination, except as explicitly directed by the Owner, the Contractor shall immediately proceed with the following obligations regardless of any delay in determining or adjusting amounts due under this clause: 1. Contractor must immediately discontinue work as specified in the written notice. Special Provisions 00 74 02- 16 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation 2. Terminate all subcontracts to the extent they relate to the work terminated under the notice. 3. Discontinue orders for materials and services except as directed by the written notice. 4. Deliver to the owner all fabricated and partially fabricated parts, completed and partially completed work, supplies, equipment and materials acquired prior to termination of the work and as directed in the written notice. 5. Complete performance of the work not terminated by the notice. 6. Take action as directed by the owner to protect and preserve property and work related to this contract that Owner will take possession. Owner agrees to pay Contractor for: 1. Completed and acceptable work executed in accordance with the contract documents prior to the effective date of termination; 2. Documented expenses sustained prior to the effective date of termination in performing work and furnishing labor, materials, or equipment as required by the contract documents in connection with uncompleted work; 3. Reasonable and substantiated claims, costs and damages incurred in settlement of terminated contracts with Subcontractors and Suppliers; and 4. Reasonable and substantiated expenses to the contractor directly attributable to Owner's termination action Owner will not pay Contractor for loss of anticipated profits or revenue or other economic loss arising out of or resulting from the Owner's termination action. The rights and remedies this clause provides are in addition to any other rights and remedies provided by law or under this contract. Termination for Default: Section 80-09 of FAA Advisory Circular 150/5370-10 establishes conditions, rights and remedies associated with Owner termination of this contract due default of the Contractor. A-23 TRADE RESTRICTION CERTIFICATION By submission of an offer, the Offeror certifies that with respect to this solicitation and any resultant contract, the Offeror— 1) is not owned or controlled by one or more citizens of a foreign country included in the list of countries that discriminate against U.S. firms as published by the Office of the United States Trade Representative (USTR); 2) has not knowingly entered into any contract or subcontract for this project with a person that is a citizen or national of a foreign country included on the list of countries that discriminate against U.S. firms as published by the USTR; and 3) has not entered into any subcontract for any product to be used on the Federal project that is produced in a foreign country included on the list of countries that discriminate against U.S. firms published by the USTR. Special Provisions 00 74 02- 17 MA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation This certification concerns a matter within the jurisdiction of an agency of the United States of America and the making of a false,fictitious,or fraudulent certification may render the maker subject to prosecution under Title 18 USC § 1001. The Offeror/Contractor must provide immediate written notice to the Owner if the Offeror/Contractor learns that its certification or that of a subcontractor was erroneous when submitted or has become erroneous by reason of changed circumstances. The Contractor must require subcontractors provide immediate written notice to the Contractor if at any time it learns that its certification was erroneous by reason of changed circumstances. Unless the restrictions of this clause are waived by the Secretary of Transportation in accordance with 49 CFR § 30.17, no contract shall be awarded to an Offeror or subcontractor: 1) who is owned or controlled by one or more citizens or nationals of a foreign country included on the list of countries that discriminate against U.S. firms published by the USTR; or 2) whose subcontractors are owned or controlled by one or more citizens or nationals of a foreign country on such USTR list; or 3) who incorporates in the public works project any product of a foreign country on such USTR list. Nothing contained in the foregoing shall be construed to require establishment of a system of records in order to render, in good faith, the certification required by this provision. The knowledge and information of a contractor is not required to exceed that which is normally possessed by a prudent person in the ordinary course of business dealings. The Offeror agrees that, if awarded a contract resulting from this solicitation, it will incorporate this provision for certification without modification in all lower tier subcontracts. The Contractor may rely on the certification of a prospective subcontractor that it is not a firm from a foreign country included on the list of countries that discriminate against U.S.firms as published by USTR, unless the Offeror has knowledge that the certification is erroneous. This certification is a material representation of fact upon which reliance was placed when making an award. If it is later determined that the Contractor or subcontractor knowingly rendered an erroneous certification, the Federal Aviation Administration (FAA) may direct through the Owner cancellation of the contract or subcontract for default at no cost to the Owner or the FAA. A-24 VERTERANS PREFERENCE In the employment of labor (excluding executive, administrative, and supervisory positions), the Contractor and all sub-tier contractors must give preference to covered veterans as defined within 49 U.S.C. §47112. Covered veterans include Vietnam-era veterans, Persian Gulf veterans,Afghanistan-Iraq war veterans, disabled veterans, and small business concerns (as defined by 15 U.S.C. § 632) owned and controlled by disabled veterans.This preference only applies when there are covered veterans readily available and qualified to perform the work to which the employment relates. A-25 DOMESTIC PREFERENCES FOR PROCUREMENT The Bidder or Offeror certifies by signing and submitting this bid or proposal that, to the greatest extent practicable, the Bidder or Offeror has provided a preference for the purchase, acquisition, or use of goods, products, or materials produced in the United States (including, but not limited to, iron, aluminum, steel, cement, and other manufactured products) in compliance with 2 CFR § 200.322. Special Provisions 00 74 02- 18 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation A-26 PROHIBITION OF COVERED UNMANNED AIRCRAFT SYSTEMS (UAS) The Bidder or Offeror certifies that they are aware of and comply with relevant Federal statutes and regulations, including those from the Federal Aviation Administration (FAA), for operating unmanned aircraft systems (UAS) in accordance, and in compliance with all related requirements in the FAA Reauthorization Act of 2024 (Public Law 118-63), section 936 (49 U.S.C. § 44801 note). Contractor warrants that all UAS operations will be conducted in full compliance with all applicable Federal Aviation Administration (FAA) regulations, including but not limited to 14 CFR Part 107, and any other applicable local, state, or Federal laws and regulations. Sponsors and subgrant recipients cannot use AIP grant funds to enter into, extend, or renew a contract related to covered unmanned aircraft systems (UAS). This includes both procurement and operational contracts, as well as contracts with entities that operate such systems. Special Provisions 00 74 02- 19 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation PAGE INTENTIONALLY LEFT BLANK Special Provisions 00 74 02-20 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation SECTION B—STATE TERMS AND CONDITIONS B-01 PROHIBITION ON CONTRACTS WITH FOREIGN TERRORIST ORGANIZATIONS Contractor's Acknowledgement of Prohibition on Contracts with Companies Boycotting Israel Effective September 1, 2017, Contractor acknowledges, in accordance with Chapter 2270 of the Texas Government Code, that Contractor does not boycott Israel and will not boycott Israel during the term of any contract with the City of Dallas to provide goods and services to the City. Contractor further acknowledges that this provision is hereby incorporated by reference, as if written word for word, into any subsequent contract entered into between City and Contractor for goods and services." B-02 PROHIBITION ON CONTRACTS WITH COMPANIES BOYCOTTING ISRAEL Contractor's Acknowledgement of Prohibition on Contracts with Foreign Terrorist Organizations Effective September 1, 2017, Contractor acknowledges, in accordance with Chapter 2252 of the Texas Government Code, that(a)Contractor does not engage in business with Iran, Sudan or any foreign terrorist organization and (b) Contractor is not listed by the Texas Comptroller as a terrorist organization as defined by Chapter 2252 of the Texas Government Code. Contractor further acknowledges that this provision is hereby incorporated by reference, as if written word for word, into any subsequent contract entered into between City and Contractor for (1) professional or consulting services subject to the Professional Services Act - Chapter 2254 of the Texas Government Code, (2) general construction, (3)an improvement, (4)a service, (5) a public works project, or(5)for a purchase of supplies, materials or equipment. B-03 PROHIBITION ON CONTRACTS WITH CERTAIN FOREIGN-OWNED COMPANIES IN CONNECTION WITH CRITICAL INFRASTRUCTURE Contractor's Acknowledgement of Prohibition on Contracts with Certain Foreign-Owned Companies in Connection with Critical Infrastructure Effective June 18, 2021, Contractor acknowledges, in accordance with Chapter 2274 of the Texas Government Code, that Contractor does not and will not engage in contracts with certain foreign-owned companies in connection with critical infrastructure during the term of any contract with the City of Corpus Christi to provide goods and services to the City. Contractor further acknowledges that this provision is hereby incorporated by reference,as if written word for word, into any subsequent contract entered into between the City and Contractor for goods and services. B-04 PROHIBITION ON CONTRACTS WITH COMPANIES THAT DISCRIMINATE AGAINST FIREARM AND AMMUNITION INDUSTRIES The Contractor must verify that it does not have a practice, policy, guidance or directive that discriminates against a firearm entity or firearm trade association and will not discriminate during the term of the contract against a firearm entity or firearm trade association. Verification is not required from a sole source provider or when the City does not receive any bids from a company able to provide the required verification. Discriminate, firearm entity and firearm trade association are defined in Government Code Chapter 2274 B-05 PROHIBITION ON CONTRACTS WITH COMPANIES BOYCOTTING CERTAIN ENERGY COMPANIES The Contractor verifies that it does not have a practice, policy, guidance, or directive that discriminates against energy companies as defined in Chapter 809 of the Texas Government Code. The Contractor verifies that it: a) Does not boycott energy companies; and b) Will not boycott energy companies during the term of the contract Special Provisions 00 74 02-21 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation PAGE INTENTIONALLY LEFT BLANK Special Provisions 00 74 02-22 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation SECTION C—LOCAL TERMS AND CONDITIONS C-01 CONTRACTOR'S INSURANCE Contractor shall obtain insurance of the types and in the amounts described below, but in no event shall such limits be less than those required by applicable law. The insurance shall be written by insurance companies and on forms acceptable to Owner. Owner and Garver, LLC shall be included as an insured under the CGL, (using ISO Additional Insured Endorsement CG 20 10 11 85 or a substitute providing equivalent coverage), and under the commercial automobile liability(using ISO Additional Insured Endorsement CA 2048 or a substitute providing equivalent coverage), and commercial umbrella, if any. This insurance, including insurance provided under the commercial umbrella, if any, shall apply as primary and non- contributory insurance with respect to any other insurance or self-insurance programs afforded to, or maintained by, Owner. C-01.1 Commercial General and Umbrella Liability Insurance: See Section 00 725 00 General Conditions and 00 73 00 Supplementary Conditions C-01.2 Owner's and Contractor's Protective Liability Insurance: See Section 00 725 00 General Conditions and 00 73 00 Supplementary Conditions C-01.3 Railroad Protective Liability Insurance: Not applicable. C-01.4 Contractor's Professional Liability Insurance: See Section 00 725 00 General Conditions and 00 73 00 Supplementary Conditions C-01.5 Commercial Auto and Umbrella Liability Insurance: See Section 00 725 00 General Conditions and 00 73 00 Supplementary Conditions C-01.6 Workers' Compensation Insurance: See Section 00 725 00 General Conditions and 00 73 00 Supplementary Conditions C-01.7 Property Insurance: See Section 00 725 00 General Conditions and 00 73 00 Supplementary Conditions C-01.8 Primary and Non-contributory: Contractor agrees that the insurance listed above, including insurance provided under the commercial umbrella, if any, shall apply as primary and non-contributory insurance with respect to any other insurance or self-insurance programs afforded to, or maintained by, Owner. C-01.9 Waiver of Subrogation: Contractor waives all rights against the Owner and Garver, LLC and its agents, officers, directors and employees for recovery of damages to the extent these damages are covered by the commercial general liability, commercial umbrella liability insurance, automobile liability insurance and workers compensation insurance maintained pursuant to paragraph C-01 of this agreement. C-01.10 No Implied Waiver: Contractor shall furnish certifications matching the coverage requirements. Failure of Owner or Engineer to demand such certificate or other evidence of full compliance with these insurance requirements or failure of Owner or Engineer to identify a deficiency from evidence that is provided shall not be construed as a waiver of the contractors obligations to furnish and maintain such insurance, or as a waiver to the enforcement of any of the provisions at a later date. Any waiver of the contractor's obligation to furnish such certificate or maintain such evidence must be by written change order and signed by a Managing Member(Officer)of the Engineer and the Owner. Special Provisions 00 74 02-23 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation C-01.11 Cancellation, Non-Renewal, and/or Impairment Notification: The Contractor shall not cause any insurance policy to be cancelled or permit it to lapse and all insurance policies shall include an endorsement to the effect that the insurance policy or certificate shall not be subject to cancellation or to a reduction in the required limits of liability or amounts of insurance until notice has been mailed to the Owner and Engineer, stating the date when such cancellation or reduction shall be effective, which date shall not be less than (60)days after such notice. The amount shown in the bid item for the Owner's Protective Insurance shall include that amount of additional premium required for obtaining Owner's and Engineer's Protective Liability insurance for the Owner and Garver, LLC. The Engineer has the right to request justification from the contractor for the full amount of the cost included under the items "Owner's Protective Insurance". The amount of additional premium required for [obtaining Owner's and Engineer's Protective Liability insurance for the Owner and Garver, LLC.] [including the Owner and Garver, LLC on the Contractor's policy as additional insured.] shall be subsidiary to other contract items. The Engineer has the right to request justification from the contractor for the full amount of the cost included under the items"Owner's Protective Insurance". Notice shall be sent via email and regular mail to the following persons and addresses: Owner: ADD OWNER POINT OF CONTACT MAIL AND EMAIL ADDRESSES Garver: ADD GARVER CLIENT MANAGER POINT OF CONTACT MAIL AND EMAIL ADDRESSES Special Provisions 00 74 02-24 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation C-01.12 Sample Certificate of Liability Insurance: Ac"R CERTIFICATE OF LIABILITY INSURANCE DATE(MMIDD YY Y) i' (must be dated) THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER.THIS CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S),AUTHORIZED REPRESENTATIVE OR PRODUCER,AND THE CERTIFICATE HOLDER. IMPORTANT: If the certificate holder is an ADDITIONAL INSURED,the policy(ies)must be endorsed. If SUBROGATION IS WAIVED,subject to the terms and conditions of the policy,certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). PRODUCER Agency Name CONTACT NAME: Agency Contact Agency Address PHONE(AIC,No EMI: A ency ph# F a No: E-MAIL ADDRESS:Agency Contact email address INSURERS AFFORDING COVERAGE NAIC# www.stephens.com INSURER A: Carrier Name(AM Best Rating) INSURED INSURERS Named Insured on the policies INSURER C: INSURER D: INSURER E: INSURER F: COVERAGES CERTIFICATE NUMBER: REVISION NUMBER: THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED. NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR TypE OFINSURANCE POLICY EFF POLICY EXP LTR I SR POLICY NUMBER MM/DD/YYYY MM/DD LIMITS A GENERAL LIABILITY EACH OCCURRENCE $ 5,000,000 COMMERCIAL GENERAL LIABILITY X X XXXXXXXXXX PREMISES(Eaoa�nce) $ 300,000 CLAIMS-MADE OCCUR MEDEXP(Anyoneperson) $ 10,000 PERSONAL&ADV INJURY $ 1,000,000 GENERAL AGGREGATE $ 5.000,00 GENL AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $ 500000 POLICY PRO-jECTLOC $ OMBINED SINGLE LIMIT AUTOMOBILE LIABILITY Ea accitlen[ $ 1,000000 ANYAUTO X X XXXXXXXXXXX BODILY INJURY(Per person) $ ALL AUTOS OWNED SCQ ULED BODILY INJURY(Per accident)$ AUT NON-OWNED PROPERTY DAMAGE HIREDAUTOS AUTOS Peraccklent $ $ $ UMBRELLALIAB / OCCUR EACH OCCURRENCE $ _CESS UAB CLAIMS-MADE X X XXXXXXXXXXX AGGREGATE DIED J RETENTION$XXXXX Umbrella/Excess only if $ needed to meet the required underlying General Liability $ limit pTI{.$ WORKERS COMPENSATION WCSTATU- ER AND EMPLOYERS'LIABILITY TORY LIMITS ANY PROPRIETOR/PARTNER/EXECUTNE Li MIA X XXXXXXXXXXX E.L.EACHACCIDENT $ 500,000 OFFICER/MEMBER EXCLUDED? (Mandatory in NH) EL DISEASE-EA EMPLOYEE$ 500000 It yes,describe under DESCRIPTION OF OPERATIONS below E.L.DISEASE-POLICY LIMIT $ 500,000 XXXXXXXXXXX DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES(Attach ACORD 101,Additional Remarks Schedule,H more space is required) Owner&Garver,LLC shall be included as an Additional Insured by endorsement#CG2010(11/85)on the General Liability and#CA2048 on the Autom Ile and Umbrella or substitute endorsement providing equivalent coverage. Coverage shall be Primary and non-contributory with respect to any other insur nce or self-insurance programs afforded to the Owner and Garver LLC. Waiver of Subrogation applies in favor of the Owner and Garver LLC on all policies. 60 day notice will be provided to the Owner and Garver LLC in the event of cancellation,non-renewal and/or impairment of the Contractor's policies. CERTIFICATE HOLDER CANCELLATION Owner SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE and THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN Garver LLC ACCORDANCE WITH THE POLICY PROVISIONS. AUTHORIZED REPRESENTATIVE (must be signed by the C,.....actor's Insurance Agent) ©1988-2010 ACORD CORPORATION. All rights reserved. ACORD 25(2010105) The ACORD name and logo are registered marks of ACORD CERT W.: 15475674 —hy Jones 2/11/2013 10:58:41 AN Page 1 of 1 Special Provisions 00 74 02-25 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation C-02 UTILITIES All work in this contract shall be in accordance with the Underground Facilities Damage Prevention Act. The Contractor shall abide by the most current edition of this Act. C-03 LEGAL HOLIDAYS Holidays that shall be observed are the following: New Year's Day (January 1); Dr. Martin Luther King Jr.'s Birthday (3rd Monday in January); President's Day (3rd Monday in February); Memorial Day (last Monday in May); Juneteenth (June 19); Independence Day (July 4); Labor Day (1st Monday in September); Columbus Day (2nd Monday in October); Thanksgiving Day(4th Thursday in November); Day after Thanksgiving (Friday following Thanksgiving); Christmas Eve (December 24); and Christmas Day (December 25). If a holiday falls on a Saturday or Sunday,the observed day shall be the Friday preceding the Saturday or the Monday following the Sunday. No construction observation will be furnished on legal holidays or Sundays, except in an emergency. The Contractor shall observe these legal holidays and all Sundays,and no work shall be performed on these days except in an emergency. Calendar day contract time includes delays for all holidays. Refer to Section C-05 for more information. C-04 PROJECT MEETINGS AND COORDINATION A preconstruction conference will be called by the Engineer at a time convenient to the Owner and before the issuance of the "Notice to Proceed". The Engineer and the Contractor and such subcontractors as the Contractor may desire shall attend this meeting with the Owner. The Owner and/or Engineer will call such coordination conferences as may seem expedient to him for the purpose of assuring coordination of the work covered by this Contract.The Contractor shall attend all such conferences. This in no way relieves the Contractor of his responsibility to fully coordinate his work under this Contract. C-05 EXTENSIONS OF TIME Extensions of time for completion, under the condition of 3(a) next below, will be granted; extensions may be granted under other stated conditions: 1. If the satisfactory execution and completion of the Contract shall require work or material in greater amounts or quantities than those set forth in the Contract, then the Contract time shall be increased in the same proportion as the additional work bears to the original work contracted for. C-01.1 2.An average or usual number of inclement weather days, when work cannot proceed, is to be anticipated during the construction period and is not to be considered as warranting extension of time. See See Section 00 725 00 General Conditions and 00 73 00 Supplementary Conditions. 3. Should the work under the Contract be delayed by other causes which could not have been prevented or contemplated by the Contractor, and which are beyond the Contractor's power to prevent or remedy, an extension of time may be granted. Such causes of delay shall include but not necessarily be limited to the following: a. Acts of God, acts of the public enemy, acts of the Owner except as provided in these Specifications, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, and unusually severe weather. b. Any delays of Subcontractors or suppliers occasioned by any of the causes specified above. The Engineer or other authorized representative of the Owner shall keep a written record sufficient for determination as to the inclusion of that day in the computation of Contract time.This record shall be available for examination by the Contractor during normal hours of work as soon as feasible after the first of each Special Provisions 00 74 02-26 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation construction month.Weather reporting locations and procedures shall be discussed during the preconstruction meeting. In case of disagreement between the representative of the Owner and the Contractor, as to the classification of any day, the matter shall be referred to the Owner whose decision shall be final. The Contractor shall provide notice to the Engineer each week, in the form of written letter or e-mail, to document weather and site conditions and request certain days be deemed non-conducive due to weather or site conditions. At a minimum, reports shall contain average temperature, 24 hour rainfall and information source.The notice shall be received by the Engineer's representative by the close of business of each Tuesday for the previous week of contract time. Failure to provide the written documentation by the close of business each Tuesday shall result in all seven days of the previous week being deemed conducive.These notices shall serve as justification for whether or not an extension of time is granted, if merited. In case of disagreement between the representative of the Owner and the Contractor,as to the classification of any day,the matter shall be referred to the Owner whose decision shall be final. If the Contractor finds it impossible for reasons beyond his control to complete the work within the Contract time as specified,or as extended in accordance with the provisions of this subsection, he may, at any time prior to the expiration of the Contract time as extended, make a written request to the Engineer for an extension of time setting forth the reasons which he believes will justify the granting of his request. The Contractor's plea that insufficient time was specified is not a valid reason for extension of time. If the Engineer finds that the work was delayed because of conditions beyond the control and without the fault of the Contractor, he may recommend to the Owner that the contract time be extended as conditions justify. If the Owner extends the contract, the extended time for completion shall then be in full force and effect, the same as though it were the original time for completion. The amount of all extensions of time for whatever reason granted shall be determined by the Owner. In general, only actual and not hypothetical days of delay will be considered. The Owner shall have authority to grant additional extensions of time as the Owner may deem justifiable. C-06 QUALITY ASSURANCE/MATERIALS TESTING The Owner shall be responsible for quality assurance testing as stated in theses specifications; however, the Contractor shall be responsible for payment of any subsequent tests made necessary by previous unsatisfactory tests. In this event, the Owner's quality assurance representative shall conduct the additional testing and payment for such tests shall be directly deducted from the Contractor's payment. The Contractor shall pay for additional testing at the Owner's contract rate. C-07 RECORD DOCUMENTS The Contractor shall keep one record copy of all Specifications, Drawings, Addenda, Modifications, Shop Drawings and samples at the site, in good order, and annotated to show all changes made during the construction process. In addition, the Contractor shall note any differences between locations of underground existing facilities shown in the plans and the actual location located during construction. These record documents shall be available to the Engineer for examination and shall be delivered to the Engineer upon completion of the work. C-08 CONTRACTOR/SUBCONTRACTOR/SUPPLIER LEGAL DISPUTES Any fees, expenses, charges, fines or other costs borne by the Owner as a result of legal disputes or lawsuits between the contractor and his subcontractors, or between the contractor and his suppliers, shall be deducted from monies due or which may thereafter become due the contractor. C-09 CONSTRUCTION WARRANTY OBSERVATION COST The Contractor will be responsible for all costs associated with construction observation and oversight for work related to warranty repair as described in the General Provisions. Special Provisions 00 74 02-27 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation C-10 CONTRACTOR'S RELEASE AND AFFIDAVIT At the project's completion, the Contractor shall execute the attached Release and Lien Waiver to release all claims against the Owner arising under and by virtue of his Contract. The date of the Release shall be that agreed to for the final acceptance of the project with the Owner. C-11 SUBMITTALS The Contractor shall prepare and submit information required by the individual Specification sections sufficiently in advance of the related work to allow an appropriate review time by the Engineer. The types of submittals are indicated in the individual Specification sections. During the preconstruction conference, the Contractor shall review his submittal schedule and procedures. The Contractor shall provide one of the following submittal package types: 1. Submit electronic submittals via email as PDF electronic files directly to the Engineer's designated representative, or post these PDF electronic files directly to the Engineer's FTP site specifically established forthis project. Electronic submittals shall be in Adobe Acrobat(*.PDF)format and shall be legible when printed. Submittals shall be neat, organized, and easy to interpret. Assemble complete submittal package into a single indexed electronic file, incorporating submittal requirements of an individual Specification section, the transmittal form with unique submittal numbering system, and electronic links or tabs enabling navigation to each item. Unless approved otherwise by the Engineer, all submittals for the individual Specification section shall be submitted at one time. Submittals must come directly from the Prime Contractor; submittals from subcontractors or suppliers will not be reviewed. Incomplete submittals are unacceptable, will be considered nonresponsive, and will be returned for resubmittal without review. Faxed submittals or submittals with extremely small or otherwise unreadable print will not be accepted. Submittals not required by the Contract Documents will be returned by the Engineer without action. The Contractor shall be responsible for payment of any subsequent submittal reviews beyond the second iteration of a specific item as indicated by the construction submittal log. In this event, the Owner's representative shall conduct the submittal review and payment for the submittal review shall be directly deducted from the Contractor's payment. The Contractor shall pay for additional submittal reviews at the Owner's contract rate. The Contractor shall retain complete copies of submittals on project site. Use only final submittals that are marked with approval notation from Engineer's submittal review stamp with comments form. Resubmittals shall continue the unique, sequential, submittal numbering system. Resubmittals without unique numbering, example resubmittals transmitted as 005A or 005REV, are unacceptable and will be returned un-reviewed. The Contractor will implement, in conjunction with the Engineer and LRNA Manager of Construction, project-specific procedures/policies for construction management services during construction to assist in obtaining completed Projects in accordance with the purpose and intent of the construction documents including, but not limited to the following: 1. Use web based Construction Management Software (EADOC) provided to the Contractor. Access to this system will be provided at no cost to the Contractor by LRNA. Special Provisions 00 74 02-28 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation 2. Ensure that ALL Subcontractors, and any other project participants use the EADOC Construction Management Software provided by LRNA.Access to this system will be provided at no cost to each by LRNA. C-12 STORMWATER POLLUTION PREVENTION PLAN See 0157 00 Temporary Controls. The ren+rar+er shall note that storm water and n nitatien runoff fbegins. There will be ne separate measurement er payment fer any rgm NhUrn-heK XXXXXXX This regulation is mandated by Title 40 Gode of Fed-eiral Regulations (GFR) 122. The r-,entrag-ter s;h_;;l1 -bp- respens'ble fer the preparation (permit to be obt-ained- in the &Afner's narne), fees, s rnplernentatien, reGOrds, and all other requirements -of the 2-ternmAmater Peallutien Prevention Plan (SWIPPIP). The 1.-;h-;;" be responsible te the Q%vner for the payment ef any fines that may be imposed LApen XXX (of required). The regulation way allow an exemption for serne GenStFUGtien sites under a Gertain size-. have a valid permit on plaGe or shall previde evideRGe ef aR exemptieR te thp- &A.Mer before any GenStFUGtien , materials, needed by then n+raGtor+o r ply with then permit.dl C-13 SUBSURFACE AND PHYSICAL CONDITIONS; HAZARDOUS ENVIRONMENTAL CONDITIONS See Section 00 73 00 Supplementary Conditions. The following report(s) of expleratien and tests osubsur-faGe Gonditions at or Gentiguous to the site used by Design Engineer On preparing the GentraGt DoGurnents are available upon 48 hours' n0tiGe to Owner. Samples taken frorn bore holes are-avanilable flor +ice at c;entigueus to the site (eXGept Underground Far-Aities) have been use y Design Engineer in preparing the ren+rror+ Agri-Mont; i ice by Design n been Engineer in preparing the Gen+rar+Agri amen+c No reports of expleration and tests rof hazardous environmental Ganditions at or Gontigueus to the have been used by Design Engineer in preparing the Ge-n+rar+ Deo.umen+c design Engineer in evaing the Gen+rar+Derr amen+o So'! GhaFacteristies provided on any S001 FepE)Fts, OF as shown on boring logs, are representative only at the location of the sample taken, and neither the Owner, EngineeF nor Engineer's consultants will be responsible fGF vaFiations in the semi characteFiSt'Gs at other locations. Any suibsuirfaoe information, geotechniGal reports-, or hazaFdous environmental conditions made available to GontraCtOF was obtained and intended for the OwneF's design and estimating purposes enly. Such FepeFts and dFawings are not ContFact Documents. The ContraGtor may not rely upon or make any Glairn against Owner, Engineer, or Engineer's Gensulta with respeGt to (1) the GOMpleteness Of SUGh reports and drawings for GontraGtor's purposes, inGluding, but not limited to, any aspeGts of the means, methods,teGhniques,sequenGes, and prE)GedUres Of Gonstrurction tee be empleyed by the GentraGter and safety preGautions and pregrarns inGident thereto, (2) other data, 0nferma+ien T Special Provisions 00 74 02-29 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation requirements set forth On these ContraGt DOGUFnents, the requirements in the GontraGt DOGUrnents shall take C-14 OWNER'S SAFETY PROGRAM Contractor shall comply with the applicable requirements of Owner's safety programs, if any. The following Owner safety programs are applicable to the Work: C-15 PROJECT SUPERINTENDENT Contractor shall, upon receipt of the Notice of Award, designate in writing to the Engineer for approval the name of the superintendent who will be in charge of the Contractor's operations. It is a strict requirement of this Contract that the superintendent be permanently assigned to the project for the duration of the work. Once assigned to the project, the Superintendent cannot be removed by the Contractor without the prior written consent of the Engineer. The Superintendent shall have at least 10 years of airport construction experience (or other qualifications satisfactory to the Owner)on construction at air carrier airports. No work of any type shall be performed on the job site during the absence of the designated representative. With approval of the Engineer, additional representatives may be approved to cover additional shifts required by the project. The Contractor shall, upon receipt of the Notice of Award, designate in writing to the Engineer for approval the name of the electrical superintendent who will be in charge of the electrical subcontractor's operations. It is a strict requirement of this contract that the electrical superintendent be permanently assigned to the project for the duration of the work. Once assigned to the project, the electrical superintendent cannot be removed by the Contractor without the prior written consent of the Engineer. The electrical superintendent shall have at least 5 years of airport construction experience (or other qualifications satisfactory to the Owner)on construction at air carrier airports and installation of complete in-pavement lighting systems. No electrical work of any type shall be performed on the job site during the absence of the designated representative. C-16 SALES AND USE TAXES City of Corpus Christi is exempt from all Sales Tax. END OF SPECIAL PROVISIONS Special Provisions 00 74 02-30 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation RELEASE OF LIEN FROM: Contractor's Name: Address: TO: Owner's Name: Address: DATE OF CONTRACT: Upon receipt of the final payment and in consideration of that amount, the undersigned does hereby release the Owner and its agents from any and all claims arising under or by virtue of this Contract or modification thereof occurring from the undersigned's performance in connection with the project. Contractor's Signature: Title: Subscribed and sworn to before me this day of 20 Notary Public My Commission Expires: Special Provisions 00 74 02-31 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation PAGE INTENTIONALLY LEFT BLANK Special Provisions 00 74 02-32 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation CONTRACTOR'S AFFIDAVIT FROM: Contractor's Name: Address: TO: Owner's Name: Address: DATE OF CONTRACT: I hereby certify that all claims for material, labor, and supplies entered into contingent and incident to the construction or used in the course of the performance of the work on the project have been fully satisfied. Contractor's Signature: Title: Subscribed and sworn to before me this day of 20 Notary Public My Commission Expires: The Surety Company consents to the release of the retained percentage on this project with the understanding that should any unforeseen contingencies arise having a right of action on the bond that the Surety Company will not waive liability through the consent to the release of the retained percentage. Dated: Surety Company: By: Resident Agent, State of Texas Special Provisions 00 74 02-33 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 Corpus Christi International Airport CCIA Taxiway Echo Rehabilitation PAGE INTENTIONALLY LEFT BLANK Special Provisions 00 74 02-34 CCIA Taxiway Echo Rehabilitation Project No: Project No:26122 011100 SUMMARY OF WORK 1.00 GENERAL 1.01 WORK INCLUDED A. Construct Work as described in the Contract Documents. 1. Provide the materials, equipment, and incidentals required to make the Project completely and fully useable. 2. Provide the labor, equipment, tools, and consumable supplies required for a complete Project. 3. The Contract Documents do not indicate or describe all of the Work required to complete the Project. Additional details required for the correct installation of selected products are to be provided by the Contractor and coordinated with the OAR. 1.02 DESCRIPTION OF WORK A. Work is described in general, non-inclusive terms as: 1. Pavement rehabilitation through mill and overlay and installation of pavement markings on Taxiway E, including grading and drainage improvements at intersection of Taxiway E and A. a. Project is funded by FAA. 1.03 WORK UNDER OTHER CONTRACTS- NONE A. The following items of work are not included in this Contract, but may impact construction scheduling and completion: B. In the case of a disagreement between the above list and those specified elsewhere in the Contract Documents, the Contractor is to base his Proposal on the most expensive listing. C. Completion of the Work described in this Contract may impact the construction and testing of the items listed above. 1. Coordinate construction activities through the OAR. 2. Pay claims for damages which result from the late completion of the Project or any specified Milestones. 1.04 WORK BY OWNER- NONE A. The Owner plans to perform the following items of work which are not included in this Contract, but may impact the construction scheduling and completion: B. Completion of the Work described in this Contract may impact the construction of the items listed above. 1. Coordinate construction activities through the OAR. 2. Pay claims for damages which result from the late completion of the Project or any specified Milestones. Summary of Work 01 1100- 1 CCIA Taxiway Echo Rehabilitation Rev 10/2018 Project No: 26122 C. Owner will provide normal operation and maintenance of the existing facilities during construction, unless otherwise stated. 1.05 CONSTRUCTION OF UTILITIES— NOT USED A. Pay for temporary power, including but not limited to construction cost, meter connection fees, and permits. 1.06 USE PRIOR TO FINAL COMPLETION A. Owner has the right to use or operate any portion of the Project that is ready for use after notifying the Contractor of its intent to do so. B. The execution of Bonds is understood to indicate the consent of the surety to these provisions for use of the Project. C. Provide an endorsement from the insurance carrier permitting use of Project during the remaining period of construction. D. Conduct operations to insure the least inconvenience to the Owner and general public. 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Summary of Work 01 1100-2 CCIA Taxiway Echo Rehabilitation Rev 10/2018 Project No: 26122 01 23 10 ALTERNATES AND ALLOWANCES 1.00 GENERAL 1.01 REQUIREMENTS A. Alternates: 1. This Section describes each alternate by number and describes the basic changes to be incorporated into the Work when this alternate is made a part of the Work in the Agreement. 2. Drawings and Specifications will outline the extent of Work to be included in the alternate Contract Price. 3. Coordinate related Work and modify surrounding Work as required to properly integrate the Work under each alternate,and provide a complete and functional Project as required by the Contract Documents. 4. Bids for alternates may be accepted or rejected at the option of the Owner. 5. Owner may incorporate these alternates in the Contract when executed, or may issue a Change Order to incorporate these alternates within 120 days at the prices offered in the Bid, unless noted otherwise. A Request for a Change Proposal may be issued after 120 days or other designated time period to negotiate a new price for incorporating the Work into the Project. B. Allowances: 1. Include specified allowance amount in the Contract Price. 2. The amount of each allowance includes: a. The cost of the product to the Contractor less any applicable trade discounts. b. Delivery to the Site. c. Applicable taxes. 3. Include in the Contract Price all costs for: a. Handling at the Site, including unloading, uncrating, and storage per Article 19 of SECTION 0172 00 GENERAL CONDITIONS. b. Cost for labor and equipment for installation and finishing. c. Cost for related products not specifically listed in the allowance required for installation, including consumable supplies and materials. d. All overhead, profit, and related costs. 4. Assist Owner in the selection of products. a. Identify qualified Suppliers. b. Obtain bids from qualified Suppliers. C. Present available alternates to the Owner through the OAR. Notify OAR of: 1) Any objections to a particular Supplier or product. Alternates and Allowances 01 23 10- 1 CCIA Taxiway Echo Rehabilitation Rev 5/2020 Project No: 26122 2) Effect on the Construction Schedule anticipated by the selection of each option. 3) Cost of each option. 5. Upon selection of the product: a. Purchase and install the product. b. Contractor's responsibilities for products shall be the same as for products selected by the Contractor. 6. Submit a Change Proposal per Article 12 of SECTION 00 72 00 GENERAL CONDITIONS to adjust Contract Price if the net cost of the product is more or less than the specified amount. a. Adjust the unit cost applied to the quantities installed per the method of payment described in Article 17 of SECTION 00 72 00 GENERAL CONDITIONS for products specified as Unit Price Work. b. Do not perform Work until selection of alternate has been approved by the Owner. C. Provide actual invoices for the materials. 1.02 DOCUMENT SUBMITTALS A. Provide documents for materials furnished as part of the alternate in accordance with Article 24 of SECTION 00 72 00 GENERAL CONDITIONS. 1.03 DESCRIPTION OF ALTERNATES A. Additive Alternate 1 -Construct Temporary ARFF Access Road: 1. Additive Alternate 1 includes Work required to construct a temporary access road for Airfield Fire Fighting and Rescue apparatus as indicated in the Drawings. Work includes drainage improvements, site grading and restoration of disturbed areas. 1.04 DESCRIPTION OF ALLOWANCES—NOT USED 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Alternates and Allowances 01 23 10-2 CCIA Taxiway Echo Rehabilitation Rev 5/2020 Project No: 26122 01 29 01 MEASUREMENT AND BASIS FOR PAYMENT 1.00 GENERAL 1.01 MEASUREMENT AND BASIS FOR PAYMENTS ON LUMP SUM ITEMS A. Include all cost for completing the Work in accordance with the Contract Documents for lump sum payment items. Include all direct cost for the Work associated with that lump sum item and a proportionate amount for the indirect costs as described in Article 17 of SECTION 00 72 00 GENERAL CONDITIONS for each lump sum item. Include cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the lump sum price. B. Measurement for progress payments will be made on the basis of the earned value for each item shown as a percentage of the cost for the lump sum item as described in Article 17 of SECTION 00 72 00 GENERAL CONDITIONS. Payment at Final Completion will be equal to the total lump sum amount for that item. 1.02 MEASUREMENT AND BASIS FOR PAYMENTS ON UNIT PRICE ITEMS A. Include all cost for completing the Work in accordance with the Contract Documents in unit price payment items. Include all direct cost for the Work associated with that unit price item and a proportionate amount for the indirect costs as described in Article 17 of SECTION 00 72 00 GENERAL CONDITIONS for each unit price item. Include cost not specifically set forth as an individual payment item but required to provide a complete and functional system in the unit price. B. Measurement for payments will be made only for the actual measured and/or computed length, area, solid contents, number, and weight, unless other provisions are made in the Contract Documents. Payment on a unit price basis will not be made for Work outside finished dimensions shown in the Contract Documents. Include cost for waste, overages, and tolerances in the unit price for that line item. Measurement will be as indicated for each unit price item. 1.03 MEASUREMENT AND BASIS FOR PAYMENT FOR BASE BID ITEMS A. Bid Item A-1—Storm Water Pollution Prevention 1. Payment shall include but not be limited to furnishing and submitting the SWPPP to TCEQ and Owner and updating the Plan during the Project as needed. All permits and required fees related to the SWPPP will be included in this item. 2. Measurement for payment will be made per lump sum on the following basis: The initial pay application will include 50% of the lump sum bid amount minus retainage. The balance will be paid according to the percent of construction completion after 50% completion has occurred, minus retainage. B. Bid Item A-2-Ozone Advisory Days: 1. The basis of payment for Ozone Advisory Days shall include compensation to the Contractor in an event that ozone alert days are issued by the City Engineer as required in Paragraph 1.09 of Section 0157 00 of the Contract Documents. Measurement and Basis for Payment 01 29 01- 1 CCIA Taxiway Echo Rehabilitation Rev 2/2026 Project No: 26122 C. Bid Item D-1—Mobilization (Maximum 5%): 1. Include the following costs in this Bid item: a. Transportation and setup for equipment; b. Transportation and/or erection of all field offices, sheds, and storage facilities; c. Salaries for preparation of documents required before the first Application for Payment; d. Salaries for field personnel assigned to the Project related to the mobilization of the Project; and e. Demobilization. 2. Mobilization may not exceed 5 percent of the total Contract Price. All bid items included in the Contract Price other than Mobilization and Bonds and Insurance will be subtotaled and multiplied by 5 percent to determine if this requirement is met. 3. Measurement for payment will be made per lump sum on the following basis: When at least 5% of the adjusted contract amount for construction is earned, 75% of the mobilization lump sum bid amount will be eligible for payment, minus retainage. Upon Substantial Completion of all work under the Contract and removal of all equipment and materials from the Project site, the remaining 25% of the mobilization lump sum bid amount will be eligible for payment, minus retainage. D. Bid Item D-2—Bonds and Insurance (Maximum 2%) 1. Payment shall include all bonds and insurance required under the Contract Documents. 2. Bonds and Insurance may not exceed 2 percent of the total Contract Price. All bid items included in the Contract Price other than Mobilization and Bonds and Insurance will be subtotaled and multiplied by 2 percent to determine if this requirement is met. 3. Measurement for payment will be made per lump sum on the following basis: When at least 5%of the adjusted contract amount for construction is earned, 100%of the Bonds and Insurance lump sum bid amount will be eligible for payment, minus retainage. E. Bid Item D-3—Owner's Protective Insurance: 1. Payment shall include the Contractor furnishing Owner's Protective Insurance in accordance with the 00 73 00 Supplementary Conditions ARTICLE 6. 2. Measurement for payment will be made per lump sum on the following basis: Payment for Owner's Protective Insurance will be based on the receipt of documentation of actual costs. Contractor shall furnish satisfactory evidence of the rate or rates paid for all Owner's Protective Insurance. Contractor will be reimbursed for the actual costs of insurance, not to exceed, the verifiable costs for Owner's Protective Insurance by the Contractor. Measurement and Basis for Payment 01 29 01-2 CCIA Taxiway Echo Rehabilitation Rev 2/2026 Project No: 26122 F. Other Bid Items 1. The basis of measurement and payment for other Bid Items shall be as described in the applicable Specification Sections, Construction Drawings and/or BID FORM. END OF SECTION Measurement and Basis for Payment 01 29 01-3 CCIA Taxiway Echo Rehabilitation Rev 2/2026 Project No: 26122 PAGE INTENTIONALLY LEFT BLANK Measurement and Basis for Payment 01 29 01-4 CCIA Taxiway Echo Rehabilitation Rev 2/2026 Project No: 26122 0133 01 Submittal Register Specification Paragraph Types of Submittals Required Section Specification Description No. Product Sample or Operations Information Mockup Data 00 73 00 Contractor's Record Documents SS-101 Contract Safety Compliance Plan Document(SPCD) SS-300 Contractor's Lockout/Tagout Program SS-310 Light Base and Hardware SS-310 L-830 Isolation Transformer C-100 Contractor Quality Control Plan(CQCP) P-401 Coarse Aggregate P-401 Fine Aggregate P-401 Mineral Filler P-401 Bituminous Material P-401 Mix Design P-401 Quality Control Plan P-603 Bituminous Material P-620 Paint P-620 Reflective Media L-108 L-824C,S kV and/or 600V Cables L-108 Bare Counterpoise L-108 Stranded Bonding Jumper L-108 Ground Rods L-108 L-823 Connector Kits L-108 Cable Heat Shrink L-108 Cable Identification Tags L-108 Exothermic Welds L-108 Airport Lighting Circuit Insulation Resistance Test Equipment L-108 Ground Impedance Test Equipment L-110 Plastic Conduit L-110 Conduit Spacers L-110 Detectable Warning Tape L-110 Duct Markers L-110 Bronze Duct Marker Submittal Register CCIA Taxiway Echo Rehabilitation 01 33 01-1 City Project No.26122 10/2018 Specification Paragraph Types of Submittals Required Section Specification Description No. Product Sample or Operations Information Mockup Data 01 35 00 SPECIAL PROCEDURES 1.00 GENERAL 1.01 CONSTRUCTION SEQUENCE A. Perform the Work as required to complete the entire Project within the Contract Times and in the sequence stipulated below: 1. Coordinate closures with OAR designated representatives when planned work in the intersections of Taxiways Echo and Bravo and Taxiways Echo and Alpha. B. Work shall be completed within the specified time for these items: Description Time Mill & Overlay at Intersection of Taxiways Echo and Bravo 5 Days Mill & Overlay at Intersection of Taxiways Echo and Alpha 5 Days C. Consider the sequences, duration limitations, and governing factors outlined in this Section to prepare the schedule for the Work. D. Perform the Work not specifically described in this Section as required to complete the entire Project within the Contract Times. 1.02 PLAN OF ACTION A. Submit a written plan of action for approval for shutting down essential services. These include: 1. Electrical power, 2. Control power, 3. Pipelines or wastewater systems, 4. Communications equipment, and 5. Other designated functions. B. Describe the following in the plan of action: 1. Scheduled dates for construction; 2. Work to be performed; 3. Utilities, piping, or services affected; 4. Length of time the service or utility will be disturbed; 5. Procedures to be used to carry out the Work; 6. Plan of Action to handle emergencies; 7. List of manpower, equipment, and ancillary supplies; 8. Backups for key pieces of equipment and key personnel; Special Procedures 01 35 00- 1 CCIA Taxiway Echo Rehabilitation Rev 10/2018 Project No: 26122 9. Contingency plan that will be used if the original schedule cannot be met; and C. Submit plan 2 weeks prior to beginning the Work. 1.03 CRITICAL OPERATIONS A. The Owner has identified critical operations that must not be out of service longer than the designated maximum time out of service and/or must be performed only during the designated times. These have been identified in the table below: Liquidated Critical Operation Max.Time Damages Out of Operation ($ per calendar day) Reopen of Intersection of Taxiways Echo and Bravo 5 days $1,900.00 Reopen Intersection of Taxiways Echo and Alpha 5 days $1,900.00 B. Submit a written plan of action per Paragraph 1.02 for approval for critical operations. C. Work affecting critical operations is to be performed on a 24-hour a day basis until Owner's normal operations have been restored. D. Provide additional manpower and equipment as required to complete the Work affecting critical operations within the allotted time. E. Liquidated damages will be assessed if Work on critical operations is not completed within the time indicated. 1. These items are critical to the airport operations. 2. Loss of airport operations can subject the Owner to loss of revenue, additional operations cost, and fines from regulatory agencies. 3. Liquidated damages have been established for each critical operation. F. Designated Critical Operations are described in more detail as follows: 1. Critical Operation 1 -Reopen Intersection of Taxiways Echo and Bravo: a. Contractor shall have all applicable rehabilitation work completed for intersection of Taxiways Echo and Bravo for the Airport to reopen the full extent of Taxiway Bravo.The pavements shall be cleared of all construction equipment and debris and approved by Airport Operations for reopening to air operations within 5 calendar days. 2. Critical Operation 2 -Reopen Intersection of Taxiways Echo and Alpha: a. Contractor shall have all applicable rehabilitation work completed for intersection of Taxiways Echo and Alpha for the Airport to reopen the full extent of Taxiway Alpha.The pavements shall be cleared of all construction equipment and debris and approved by Airport Operations for reopening to air operations within 5 calendar days. Special Procedures 01 35 00-2 CCIA Taxiway Echo Rehabilitation Rev 10/2018 Project No: 26122 1.04 OWNER ASSISTANCE A. The Owner will assist the Contractor in issuance of Notice to Air Operations for all required taxiway closures. 2.00 PRODUCTS (NOT USED) 3.00 EXECUTION (NOT USED) END OF SECTION Special Procedures 01 35 00-3 CCIA Taxiway Echo Rehabilitation Rev 10/2018 Project No: 26122 PAGE INTENTIONALLY LEFT BLANK Special Procedures 01 35 00-4 CCIA Taxiway Echo Rehabilitation Rev 10/2018 Project No: 26122 01 50 00 TEMPORARY FACILITIES AND CONTROLS 1.00 GENERAL 1.01 WORK INCLUDED A. Provide temporary facilities, including OPT's field office and the Contractor's field offices, storage sheds, and temporary utilities needed to complete the Work. B. Install and maintain temporary Project identification signs. Provide temporary on-site informational signs to identify key elements of the construction facilities. Do not allow other signs to be displayed. 1.02 QUALITY ASSURANCE A. Provide a total electrical heating and cooling system for the OPT's field office capable of maintaining the following conditions: 1. Heating: Minimum 75 degrees ID temp at 10 degrees ambient. 2. Cooling: Minimum 75 degrees ID temp at 105 degrees ambient. 3. Relative humidity: 48 to 54 percent. B. Inspect and test each service before placing temporary utilities in use. Arrange for all required inspections and tests by regulatory agencies, and obtain required certifications and permits for use. 1.03 DELIVERY AND STORAGE A. Arrange transportation, loading, and handling of temporary buildings and sheds. 1.04 JOB CONDITIONS A. Locate buildings and sheds at the Site as indicated or as approved by the OPT. B. Prepare the Site by removing trees, brush, or debris and performing demolition or grubbing needed to clear a space adequate for the structures. C. Pay for the utilities used by temporary facilities during construction. D. Provide each temporary service and facility ready for use at each location when the service or facility is first needed to avoid delay in the performance of the Work. Provide OPT's field office complete and ready for occupancy and use within 7 days of the Notice to Proceed. E. Maintain, expand as required, and modify temporary services and facilities as needed throughout the progress of the Work. F. Remove services and facilities when approved by the OAR. G. Operate temporary facilities in a safe and efficient manner. 1. Restrict loads on temporary services or facilities to within their designed or designated capacities. 2. Provide sanitary conditions. Prevent public nuisance or hazardous conditions from developing or existing at the Site. Temporary Facilities and Controls 01 50 00- 1 CCIA Taxiway Echo Rehabilitation Rev 8/2019 Project No: 26122 3. Prevent freezing of pipes,flooding, or the contamination of water. 4. Maintain Site security and protection of the facilities. 1.05 OPTIONS A. Construction offices may be prefabricated buildings on skids or mobile trailers. B. Storage sheds may be prefabricated buildings on skids or truck trailers. 2.00 PRODUCTS 2.01 TEMPORARY FIELD OFFICES—FIELD OFFICE NOT REQUIRED A. The Contractor must furnish the OPT with a field office at the Site. The field office must contain at least 120 square feet of useable space. The field office must be air-conditioned and heated and must be furnished with an inclined table that measures at least 30 inches by 60 inches and two chairs. The Contractor shall move the field office on the Site as required by the OAR. There is no separate pay item for the field office. B. Furnish a field office of adequate size for Contractor's use. Provide conference room space for a minimum of 10 people. C. Other trades may provide their own offices only when space is available at the Site, and the OPT agrees to its size, condition, and location. D. No monthly partial payments will be processed until OPT's field office facilities are completed and approved. 2.02 TEMPORARY STORAGE BUILDINGS A. Furnish storage buildings of adequate size to store any materials or equipment delivered to the Site that might be affected by weather. 2.03 TEMPORARY SANITARY FACILITIES A. Provide sanitary facilities at the Site from the commencement of the Project until Project conclusion. Maintain these facilities in a clean and sanitary condition at all times, and comply with the requirements of the local health authority. On large sites, provide portable toilets at such locations that no point in the Site shall be more than 600 feet from a toilet. B. Use these sanitary facilities. Do not use restrooms within existing or Owner-occupied buildings. 2.04 TEMPORARY HEAT A. Provide heating devices needed to protect buildings during construction. Provide fuel needed to operate the heating devices and attend the heating devices at all times they are in operation, including overnight operations. Temporary Facilities and Controls 01 50 00-2 CCIA Taxiway Echo Rehabilitation Rev 8/2019 Project No: 26122 2.OS TEMPORARY UTILITIES A. Provide the temporary utilities for administration, construction, testing, disinfection, and start-up of the Work, including electrical power, water, and telephone. Pay all costs associated with furnishing temporary utilities. 1. Provide a source of temporary electrical power of adequate size for construction procedures. a. Use existing power systems where spare capacity is available. Provide temporary power connections that do not adversely affect the existing power supply. Submit connections to the OAR for approval prior to installation. b. Provide electrical pole and service connections that comply with Laws and Regulations and the requirements of the power company. 2. Provide telephone service to the Site and install telephones inside the Contractor's and the OPT's field office. 2.06 WATER FOR CONSTRUCTION A. Provide temporary water. Potable water may be purchased from the Owner by obtaining a water meter from the Owner and transporting water from a water hydrant. Non-potable water may be used for hydraulic testing of non-potable basins or pipelines. Include the cost of water in the Contract Price. B. Contractor must comply with the City of Corpus Christi's Water Conservation and Drought Contingency Plan as amended (the "Plan"). This includes implementing water conservation measures established for changing conditions. The City Engineer will provide a copy of the Plan to Contractor at the pre-construction meeting. The Contractor will keep a copy of the Plan on the Site throughout construction. 3.00 EXECUTION 3.01 LOCATION OF TEMPORARY FACILITIES A. Locate temporary facilities in areas approved by the OAR. Construct and install signs at locations approved by the OAR. Install informational signs so they are clearly visible. 3.02 PROJECT IDENTIFICATION AND SIGNS A. The Contractor will furnish two Project signs to be installed by the Contractor. The signs must be installed before construction begins and will be maintained throughout the Project period by the Contractor. The locations of the signs will be determined in the field by the OAR. 3.03 TEMPORARY LIGHTING A. Provide temporary lighting inside buildings once buildings are weatherproof. B. Provide lighting that is adequate to perform Work within any space. Temporary lights may be removed once the permanent lighting is in service. Temporary Facilities and Controls 01 50 00-3 CCIA Taxiway Echo Rehabilitation Rev 8/2019 Project No: 26122 C. Provide portable flood lights at any time that Work will be performed outside the structure at night. Provide adequate lighting at any location Work is being performed. 3.04 DRINKING WATER A. Provide all field offices with potable water. Provide a dispenser and cooling apparatus if bottled drinking water is provided. B. Pay for water services and maintain daily. 3.05 CONSTRUCTION FENCE A. Install and maintain a construction fence around the Site and off-site storage yards. Fence must be a minimum 6 feet high chain link construction unless shown otherwise. Provide gates with padlocks. 3.06 REMOVAL OF TEMPORARY FACILITIES A. Remove temporary buildings, sheds, and utilities at the conclusion of the Project and restore the Site to original condition or finished in accordance with the Drawings. B. Remove informational signs upon completion of construction. C. Remove Project identification signs, framing, supports, and foundations upon completion of the Project. 3.07 MAINTENANCE AND JANITORIAL SERVICE A. Provide janitorial service (sweeping/mopping) for the OPT's field office on a weekly basis or as requested. Empty trash receptacles daily or as needed. B. Maintain signs and supports in a neat, clean condition. Repair damage to structures, framings, or signs. C. Repair any damage to Work caused by placement or removal of temporary signage. D. Service, maintain, and replace, if necessary, the OPT's field office computer equipment throughout the Project as required by the OPT including replacement cartridges for all office equipment. END OF SECTION Temporary Facilities and Controls 01 50 00-4 CCIA Taxiway Echo Rehabilitation Rev 8/2019 Project No: 26122 01 57 00 TEMPORARY CONTROLS 1.00 GENERAL 1.01 WORK INCLUDED A. Provide labor, materials, equipment, and incidentals necessary to construct temporary facilities to provide and maintain control over environmental conditions at the Site. Remove temporary facilities when no longer needed. B. Construct temporary impounding works, channels, diversions, furnishing and operation of pumps, installing piping and fittings, and other construction for control of conditions at the Site. Remove temporary controls at the end of the Project. C. Provide a Storm Water Pollution Prevention Plan (SWPPP) as required by Texas Pollutant Discharge Elimination System (TPDES) General Permit No. TXR150000 for stormwater discharges from construction activities as applicable to the nature and size of the Project. Comply with all requirements of the Texas Commission on Environmental Quality(TCEQ) and Laws and Regulations. File required legal notices and obtain required permits prior to beginning any construction activity. D. Provide labor, materials, equipment, and incidentals necessary to prevent stormwater pollution for the duration of the Project. Provide and maintain erosion and sediment control structures as required to preventive sediment and other pollutants from the Site from entering any stormwater system including open channels. Remove pollution control structures when no longer required to prevent stormwater pollution. 1.02 QUALITY ASSURANCE A. Construct and maintain temporary controls with adequate workmanship using durable materials to provide effective environmental management systems meeting the requirements of the Contract Documents and Laws and Regulations. Use materials that require minimal maintenance to prevent disruption of construction activities while providing adequate protection of the environment. B. Periodically inspect systems to determine that they are meeting the requirements of the Contract Documents. 1.03 DOCUMENT SUBMITTAL A. Provide documents requiring approval by the OPT as Shop Drawings in accordance with Article 25 of SECTION 00 72 00 GENERAL CONDITIONS. B. Provide copies of notices, records, and reports required by the Contract Documents or Laws and Regulations as Record Data in accordance with Article 26 of SECTION 00 72 00 GENERAL CONDITIONS. 1.04 STANDARDS A. Provide a SWPPP that complies with all requirements of TPDES General Permit No. TXR150000 and any other applicable Laws and Regulations. Temporary Controls 01 57 00- 1 CCIA Taxiway Echo Rehabilitation Rev 8/2019 Project No: 26122 B. Perform Work to comply with the City of Corpus Christi Code of Ordinances, Part III, Chapter 14, Article X - titled "STORM WATER QUALITY MANAGEMENT PLANS" and any other applicable Laws and Regulations. 1.05 PERMITS A. As applicable, submit the following to the TCEQ and the Operator of any Municipal Separate Storm Sewer System (MS4) receiving stormwater discharges from the Site: 1. Notice of Intent (NOI) at least 48 hours prior to beginning construction activity. Construction activity may commence 24 hours after the submittal of an electronic NOI. 2. Notice of Change (NOC) letter when relevant facts or incorrect information was submitted in the NOI, or if relevant information in the NOI changes during the course of construction activity. 3. Notice of Termination (NOT) when the construction Project has been completed and stabilized. B. Post a copy of the NOI at the Site in a location where it is readily available for viewing by the general public and as required by Laws and Regulations prior to starting construction activities and maintain the posting until completion of the construction activities. C. Maintain copies of a schedule of major construction activities, inspection reports, and revision documentation with the SWPPP. 1.06 STORMWATER POLLUTION CONTROL A. Comply with the current requirements of TPDES General Permit No.TXR150000 as set forth by the TCEQ for the duration of the Project as applicable to the nature of the work and the total disturbed area: 1. Develop a SWPPP meeting all requirements of the TPDES General Permit. 2. Submit of a Notice of Intent to the TCEQ. 3. Develop and implement appropriate Best Management Practices as established by local agencies of jurisdiction. 4. Provide all monitoring and/or sampling required for reporting to the TCEQ. 5. Submit reports to the TCEQ as required as a condition of the TPDES General Permit. 6. Submit copies of the reports to the Designer as Record Data in accordance with Article 26 of SECTION 00 72 00 GENERAL CONDITIONS. 7. Retain copies of these documents at the Site at all times for review and inspection by the OPT or regulatory agencies. Post a copy of the permit as required by Laws and Regulations. 8. Assume sole responsibility for implementing, updating, and modifying the TPDES General Permit per Laws and Regulations for the SWPPP and Best Management Practices. B. Use forms required by the TCEQ to file the Notice of Intent. Submit the Notice of Intent at least 2 days prior to the start of construction. Develop the SWPPP prior to submitting the Temporary Controls 01 57 00-2 CCIA Taxiway Echo Rehabilitation Rev 8/2019 Project No: 26122 Notice of Intent. Provide draft copies of the Notice of Intent,SWPPP,and any other pertinent TCEQ submittal documents to Owner for review prior to submittal to the TCEQ. C. Return any property disturbed by construction activities to either specified conditions or pre- construction conditions as set forth in the Contract Documents. Provide an overall erosion and sedimentation control system that will protect all undisturbed areas and soil stockpiles/spoil areas. Implement appropriate Best Management Practices and techniques to control erosion and sedimentation and maintain these practices and techniques in effective operating condition during construction. Permanently stabilize exposed soil and fill as soon as practical during the Work. D. Assume sole responsibility for the means, methods, techniques, sequences, and procedures for furnishing, installing, and maintaining erosion and sedimentation control structures and procedures and overall compliance with the TPDES General Permit. Modify the system as required to effectively control erosion and sediment. E. Retain copies of reports required by the TPDES General Permit for 3 years from date of Final Completion. 1.07 POLLUTION CONTROL A. Prevent the contamination of soil, water, or atmosphere by the discharge of noxious substances from construction operations. Provide adequate measures to prevent the creation of noxious air-borne pollutants. Prevent dispersal of pollutants into the atmosphere. Do not dump or otherwise discharge noxious or harmful fluids into drains or sewers, nor allow noxious liquids to contaminate public waterways in any manner. B. Provide equipment and personnel and perform emergency measures necessary to contain any spillage. 1. Contain chemicals in protective areas and do not dump on soil. Dispose of such materials at off-site locations in an acceptable manner. 2. Excavate contaminated soil and dispose at an off-site location if contamination of the soil does occur. Fill resulting excavations with suitable backfill and compact to the density of the surrounding undisturbed soil. 3. Provide documentation to the Owner which states the nature and strength of the contaminant, method of disposal, and the location of the disposal site. 4. Comply with Laws and Regulations regarding the disposal of pollutants. C. Groundwater or run-off water which has come into contact with noxious chemicals, sludge, or sludge-contaminated soil is considered contaminated. Contaminated water must not be allowed to enter streams or water courses, leave the Site in a non-contained form, or enter non-contaminated areas of the Site. 1. Pump contaminated water to holding ponds constructed by the Contractor for this purpose, or discharge to areas on the interior of the Site, as designated by the OAR. 2. Construct temporary earthen dikes or take other precautions and measures as required to contain the contaminated water and pump to a designated storage area. 3. Wash any equipment used for handling contaminated water or soil within contaminated areas three times with uncontaminated water prior to using such equipment in an Temporary Controls 01 57 00-3 CCIA Taxiway Echo Rehabilitation Rev 8/2019 Project No: 26122 uncontaminated area. Dispose of wash water used to wash such equipment as contaminated water. 1.08 EARTH CONTROL—NOT APPLICABLE A. Remove excess soil, spoil materials, and other earth not required for backfill at the time of generation. Control stockpiled materials to eliminate interference with Contractor and Owner's operations. B. Dispose of excess earth off the Site. Provide written approval from the property owner for soils deposited on private property. Obtain approval of the Owner if this disposal impacts the use of Site or other easements. 1.09 OZONE ADVISORY DAYS A. Do not conduct roofing, priming, or hot-mix paving operations, except for repairs, on days the City Engineer has notified Contractor that an ozone advisory is in effect. An extension of time will be allowed for each day for which priming or hot mix paving was scheduled, crews were prepared to perform this Work and the City Engineer issued ozone alert prevents this Work. Contractor will be compensated at the unit price indicated in the Bid for each day for which an extension of time was granted due to an ozone alert. 1.10 MANAGEMENT OF WATER—NOT APPLICABLE A. Manage water resulting from rains or ground water at the Site. Maintain trenches and excavations free of water at all times. B. Lower the water table in the construction area by acceptable means if necessary to maintain a dry and workable condition at all times. Provide drains, sumps, casings, well points, and other water control devices as necessary to remove excess water. C. Provide continuous operation of water management actions. Maintain standby equipment to provide proper and continuous operation for water management. D. Ensure that water drainage does not damage adjacent property. Divert water into the same natural watercourse in which its headwaters are located, or other natural stream or waterway as approved by the Owner. Assume responsibility for the discharge of water from the Site. E. Remove the temporary construction and restore the Site in a manner acceptable to the OAR and to match surrounding material at the conclusion of the Work. 1.11 DEWATERING—NOT APPLICABLE A. This item is considered subsidiary for all dewatering methods other than "well pointing" to the appropriate bid items as described in the Bid Form where dewatering is needed to keep the excavation dry, as approved by the Designer, and shall include all costs to provide a dry foundation for the proposed improvements. B. Storm water that enters an excavation can be pumped out as long as care is taken to minimize solids and mud entering the pump suction and flow is pumped to a location that allows for sheet flow prior to entering a storm water drainage ditch or storm water inlet. Temporary Controls 01 57 00-4 CCIA Taxiway Echo Rehabilitation Rev 8/2019 Project No: 26122 C. An alternative to sheet flow is to pump storm water to an area where ponding occurs naturally without leaving the designated work area or by a manmade berm(s) prior to entering the storm water system. Sheet flow and ponding is to allow solids screening and/or settling prior to entering a storm water conduit or inlet. D. Storm water or groundwater shall not be discharged to private property without permission. It is the intent that Contractor discharges groundwater primarily into the existing storm water system, provided that the quality of groundwater is equal to or better than the receiving stream,the Corpus Christi Bay. E. Testing of groundwater quality is to be performed by the Contractor, at the Contractor's expense, prior to commencing discharge and shall be retested by the Contractor, at the Contractor's expense, a minimum of once a week. Contractor shall coordinate with the Owner on all testing. Tests will also be performed as each new area of construction is started. F. Another option for disposal of groundwater by Contractor would include pumping to the nearest wastewater system. If discharging to temporary holding tanks and trucking to a wastewater or wastewater plant, the costs for these operations shall be negotiated. Other groundwater disposal alternatives or solutions may be approved by the Designer on a case by case basis. G. Prior to pumping groundwater from a trench to the wastewater system the Contractor shall contact Wastewater Pre-treatment Coordinator at 826-1817 to obtain a "no cost" permit from the Owner's Waste Water Department. Contractor will pay for any water quality testing or water analysis cost required. The permit will require an estimate of groundwater flow. Groundwater flow can be estimated by boring a hole or excavating a short trench then record water level shortly after completion, allow to sit overnight, record water level again, pump hole or trench dry to a holding tank or vacuum truck then record how long it takes to fill to original level and overnight level. 1.12 DISPOSAL OF CONTAMINATED GROUNDWATER—NOT APPLICABLE A. An allowance will be included in the Bid for the unanticipated disposal of contaminated groundwater. This allowance may not be needed but is provided in case contaminated groundwater is encountered during the course of the Project and does not meet the water quality requirements for discharge into the storm water or wastewater systems. This allowance includes all materials, tools, equipment, labor, transportation, hauling, coordination, and proper disposal of the contaminated water at an approved landfill, deep water injection well, or other site as agreed to by the Designer. Suggested disposal facilities would be [US Ecology (USET) in Robstown, Texas or Texas Molecular in Corpus Christi, Texas]. B. The payment for this Work will be based on the Contractor's actual costs and will be negotiated. Payment will not include costs associated with routine dewatering, which is considered subsidiary to the appropriate bid items as described in Paragraph 1.11. 1.13 DISPOSAL OF HIGHLY CHLORINATED WATER—NOT APPLICABLE A. Dispose of water used for testing, disinfection, and line flushing. Comply with Owner's requirements and Laws and Regulation regarding the disposal of contaminated water, including water with levels of chlorine,which exceed the permissible limits for discharge into wetlands or environmentally sensitive areas. Comply with the requirements of all regulatory Temporary Controls 01 57 00-5 CCIA Taxiway Echo Rehabilitation Rev 8/2019 Project No: 26122 agencies in the disposal of all water used in the Project. Include a description and details for disposal of this water in a Plan of Action per SECTION 0135 00 SPECIAL PROCEDURES. Do not use the Owner's wastewater system for disposal of contaminated water. 1.14 WINDSTORM CERTIFICATION— NOT APPLICABLE A. All affected materials and installation shall comply with Texas Department of Insurance Requirements for windstorm resistant construction for design wind speed as required by the current version of the International Building Code (IBC). When applicable, [Contractor] [Owner] shall be responsible for contracting with a licensed structural engineer in the State of Texas to perform all inspections and provide documentation for windstorm certification to the Texas Board of Insurance. The Contractor shall be responsible for providing all necessary design/assembly documentation for all new windows, doors, louvers, etc. to the windstorm engineer/inspectors required to conform with the requirements of the Texas Department of Insurance. 2.00 PRODUCTS 2.01 MATERIALS A. Provide materials that comply with Laws and Regulations. 3.00 EXECUTION 3.01 CONSTRUCTING, MAINTAINING AND REMOVING TEMPORARY CONTROLS A. Construct temporary controls in accordance with Laws and Regulations. B. Maintain controls in accordance with regulatory requirements where applicable, or in accordance with the requirements of the Contract Documents. C. Remove temporary controls when no longer required, but before the Project is complete. Correct any damage or pollution that occurs as the result of removing controls while they are still required. END OF SECTION Temporary Controls 01 57 00-6 CCIA Taxiway Echo Rehabilitation Rev 8/2019 Project No: 26122 Corpus Christi International Airport Taxiway Echo Rehabilitation ITEM SS-101 SAFETY PLAN COMPLIANCE DOCUMENT(SPCD) DESCRIPTION 101-1.1 The Contractor shall thoroughly review the approved Construction Safety and Phasing Plan(CSPP) and shall comply with approved CSPP. The Contractor shall certify such compliance by completing the attached SPCD and submitting to the Engineer for approval. City Project No: 26122 Issue For Bids SS-101-1 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation PAGE INTENTIONALLY LEFT BLANK City Project No: 26122 Issue For Bids SS-101-2 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation Contractor Safety Plan Compliance Documents Owner Name: City of Corpus Christi Airport: Corpus Christi International Airport Project Description: Taxiway Echo Rehabilitation Contractor: Each item listed below corresponds to a specific section of the approved CSPP. The Contractor shall certify that he/she will comply with each section of the approved CSPP. Each certified section with a"no"response must be fully explained in an attachment to the SPCD. The document shall be signed and dated by a principal or owner in the Contractor's company. All other requested information shall be completed by the Contractor and submitted to the Engineer for approval as part of the SPCD. 1. Section 1 - Correspondence: This project shall be completed in accordance with Section 1 "Coordination" of the approved Construction Safety and Phasing Plan. Owner: Contact: Victor Gonzalez Phone: 361-826-1788 Engineer: Project Manager: Philip Huntley, PE Phone: 512-485-0026 Project Engineer: Michael Clayton, El Phone: 479-257-9229 Construction Observer: Phone: Materials Testing: Phone: Contractor: Project Manager: Phone: Superintendent: Phone: Subcontractors: Phone: LIST ALL SUBS Yes No 2. Section 2 - Phasing: This project shall be completed in accordance with Section 2 "Phasing" of the approved Construction Safety and Phasing Plan. Yes No 3. Section 3 — Areas of Operations Affected by Construction Activity: This project shall be completed in accordance with Section 3 "Areas of Operations Affected by Construction Activity" of the approved Construction Safety and Phasing Plan. Yes No City Project No: 26122 Issue For Bids SS-101-3 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation 4. Section 4 — Protection of Navigational Aids (NAVAIDS): This project shall be completed in accordance with Section 4 "Protection of Navigational Aids (NAVAIDS)" of the approved Construction Safety and Phasing Plan. Yes No 5. Section 5 — Contractor Access: This project shall be completed in accordance with Section 5 "Contractor Access" of the approved Construction Safety and Phasing Plan. Yes No 6. Section 6—Wildlife Management: This project shall be completed in accordance with Section 6 "Wildlife Management" of the approved Construction Safety and Phasing Plan. Yes No 7. Section 7 — Foreign Object Debris (FOD) Management: This project shall be completed in accordance with Section 7 "Foreign Object Debris (FOD) Management' of the approved Construction Safety and Phasing Plan. Yes No 8. Section 8 — Hazardous Materials (HAZMAT) Management: This project shall be completed in accordance with Section 8 "Hazardous Materials (HAZMAT) Management' of the approved Construction Safety and Phasing Plan. Yes No 9. Section 9 — Notification of Construction Activities: This project shall be completed in accordance with Section 9"Notification of Construction Activities"of the approved Construction Safety and Phasing Plan. Yes No 10. Section 10 — Inspection Requirements: This project shall be completed in accordance with Section 10 "Inspection Requirements" of the approved Construction Safety and Phasing Plan. Yes No 11. Section 11 — Underground Utilities: This project shall be completed in accordance with Section 11 "Underground Utilities" of the approved Construction Safety and Phasing Plan. Yes No 12. Section 12—Penalties: This project shall be completed in accordance with Section 12 "Penalties" of the approved Construction Safety and Phasing Plan. Yes No 13. Section 13—Special Conditions: This project shall be completed in accordance with Section 13 "Special Conditions" of the approved Construction Safety and Phasing Plan. Yes No City Project No: 26122 Issue For Bids SS-101-4 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation 14. Section 14— Runway and Taxiway Visual Aids: This project shall be completed in accordance with Section 14"Runway and Taxiway Visual Aids"of the approved Construction Safety and Phasing Plan. Yes No 15. Section 15 — Marking and Signs for Access Routes: This project shall be completed in accordance with Section 15 "Marking and Signs for Access Routes" of the approved Construction Safety and Phasing Plan. Yes No 16. Section 16— Hazard Marking and Lighting: This project shall be completed in accordance with Section 16 "Hazard Marking and Lighting"of the approved Construction Safety and Phasing Plan. Yes No 17. Section 17—Work Zone Lighting for Nighttime Construction: This project shall be completed in accordance with Section 17 "Work Zone Lighting for Nighttime Construction" of the approved Construction Safety and Phasing Plan. Yes No 18. Section 18 — Protection of Safety Areas, Object Free Areas, Object Free Zones, and Approach / Departure Surfaces: This project shall be completed in accordance with Section 18 "Protection of Safety Areas, Object Free Areas, Object Free Zones, and Approach / Departure Surfaces" of the approved Construction Safety and Phasing Plan. Yes No 19. Section 19—Other Limitations on Construction: This project shall be completed in accordance with Section 19"Other Limitations on Construction"of the approved Construction Safety and Phasing Plan. Yes No I certify that, for the project identified herein, the responses to the foregoing items are correct as marked, and that I shall comply with the approved Construction Safety and Plan. Signed: Contractor's Authorized Representative Date: Print Name and Title of Contractor's Representative END OF ITEM SS-101 City Project No: 26122 Issue For Bids SS-101-5 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation PAGE INTENTIONALLY LEFT BLANK City Project No: 26122 Issue For Bids SS-101-6 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation ITEM SS-120 CONSTRUCTION SAFETY AND SECURITY DESCRIPTION 120-1.1 This item covers safety and security for construction of the proposed improvements. The attention of the bidder is directed to the necessity for careful examination of the entire project site to determine, at the time of bid preparation, the full extent of work to be done under the item "Construction Safety and Security." The item "Construction Safety and Security"shall include: 1. Lighted Barricades and Closed Taxiway Markers 2. Temporary Signs 3. Airport Security Requirements 4. Airport Safety Requirements 5. Contractor's Access/Haul Routes 6. Contractor's Staging Area 7. Instrument Control CONSTRUCTION METHODS 120-2.1 Lighted barricades and closed taxiway markers. a. The Contractor shall furnish, install, maintain, and remove closed taxiway markers, and lighted barricades in accordance with details on the plans and as directed by the Engineer. The closed taxiway markers shall be aviation yellow, nylon-reinforced vinyl. The markers shall be secured to the pavement/ground as shown on the plans and as directed by the Engineer. The lighted barricades and lighted runway closure markers shall be constructed and installed as shown on the plans and shall be constructed in accordance with AC 150/5370-2G Operational Safety on Airports During Construction. b. All work involved in the furnishing, installation, maintenance, and removal of lighted barricades, and closed taxiway markers will not be measured for separate payment, but will be considered subsidiary to the bid item "Construction Safety and Security." 120-2.2 Temporary signs. The Contractor shall furnish, install, maintain, and remove temporary signs in accordance with details on the plans and as directed by the Engineer. All temporary signs shall be constructed in accordance with AC 150/5370-2 Operational Safety on Airports During Construction, latest edition. All work involved in the furnishing, installation, maintenance, and removal of temporary signs will not be measured for separate payment but will be considered subsidiary to the bid item "Construction Safety and Security." 120-2.3 Airport security requirements. The Contractor shall abide by the Airport Security requirements that are outlined in the Construction Safety and Phasing Plan (CSPP) and plan general notes. Any costs associated with the Airport Security requirements will not be measured for separate payment but will be considered subsidiary to the bid item "Construction Safety and Security." Security requirements are inclusive of providing security guards as outlined in the plans. 120-2.4 Airport safety requirements. The Contractor shall abide by the Airport Safety requirements that are outlined in the Construction Safety and Phasing Plan (CSPP) and plan general notes. All costs associated with the Airport Safety requirements will not be measured for separate payment but will be considered subsidiary to the bid item "Construction Safety and Security." Flaggers shall be provided at any active airfield pavement crossings for the duration of construction. City Project No: 26122 Issue For Bids SS-120-1 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation 120-2.5 Contractor's access / haul routes. The Contractor shall layout, construct, maintain, and repair all access/haul roads needed to construct the work. The existing access roads shown on the plans shall be repaired, as determined necessary by the Engineer, at the close of the project. All such work, including all materials and labor, involved in the layout, construction, maintenance, and repair of the Contractor's access/haul roads will not be measured for separate payment but will be considered subsidiary to the bid item "Construction Safety and Security". In the event the Contractor forgoes corrective measures for restoring the access/haul route at the conclusion of the project (to condition equal to or better than existing condition), an amount no less than 10% of total bid price for Item SS-120 Construction Safety and Security will be returned to the Owner. 120-2.6 Contractor's Staging Area. The areas designated in the plans or by the Engineer as the Contractor's staging area shall be cleared and graded by the Contractor as needed for use by the Contractor in constructing the work on this project. All areas used or otherwise occupied by the Contractor for his operations shall be cleaned, regraded, and seeded, as directed by the Engineer, prior to the final acceptance of the project by the Airport. All work involved in the preparation and restoration of areas used or occupied by the contractor, including cleaning, grubbing, regrading, seeding, and installing and removing fence, will not be measured for separate payment but will be considered subsidiary to the bid item "Construction Safety and Security". In the event the Contractor forgoes corrective measures for restoring the Contractor's Staging Area at the conclusion of the project (to condition equal to or better than existing condition), an amount no less than 10%of total bid price for Item SS-120 Construction Safety and Security will be returned to the Owner. 120-2.7 Instrument Control. The Contractor will be furnished survey baselines and benchmarks to control the work as shown on the Plans. The Contractor shall be responsible for the additional instrument control necessary to layout and construct the work. The Contractor's instrument control of the work shall not be measured for separate payment, but will be considered subsidiary to the bid item "Construction Safety and Security". MEASUREMENT AND PAYMENT 120-3.1 Construction safety and security will be measured as a lump sum complete item. Work completed and accepted under this item will be paid for at the contract lump sum price bid for"Construction Safety and Security", which price shall be full compensation for furnishing all labor, tools, equipment and incidentals necessary to complete the work. Periodic payments will be made under this item in proportion to the amount of work accomplished, as determined by the Engineer. Payment will be made under: Item SS-120-3.1 Construction Safety and Security-per Lump Sum END OF ITEM SS-120 City Project No: 26122 Issue For Bids SS-120-2 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation ITEM SS-220 DITCH GRADING DESCRIPTION 220-1.1 This item shall consist of regrading existing ditches or grading new ditches as shown in the Plans or as directed by the Engineer, outside the limits of grading. The work will include clearing, grubbing, excavating, shaping, and compacting the ditch, for placing excavated materials and topsoil, seeding, and sodding to the lines and grades shown in the Plans or as directed by the Engineer. CONSTRUCTION METHODS 220-2.1 This work shall include clearing the surface of the ground in the designated areas of all heavy growth of grass or weeds, debris, and rubbish of any nature, including the grubbing of roots, and the disposal as directed of all spoil materials resulting from clearing. The Contractor shall grade the ditch to provide positive drainage as called for in the Plans or as directed by the Engineer. The work shall be completed in accordance with the applicable requirements of Item P-152 "Excavation and Embankment'. All material removed as part of the ditch grading shall be placed as provided in Item P-152 "Excavation and Embankment' of these specifications. 220-2.2 Upon completion of grading operations, stockpiled topsoil shall be handled and placed as directed, or as required in Item T-905. No direct payment will be made for topsoil under Item SS-220. 220-2.3 When stockpiling of topsoil and later rehandling of such material is directed by the Engineer, the material so rehandled shall not be paid for separately. MEASUREMENT AND PAYMENT 220-3.1 Ditch Grading will be measured for payment by the linear foot measured along the centerline of the ditch. Work completed and accepted will be paid for at the contract unit price per linear foot for"Ditch Grading". This price shall be full compensation for clearing, grubbing, excavating, shaping, and compacting the ditch; for placement of excavated material and topsoil, seeding, and sodding as shown in the Plans; and for all equipment, tools, labor and incidentals necessary to complete the work. Payment will be made under: Item SS-220-3.1 Ditch Grading— per Linear Foot END OF ITEM SS-220 City Project No: 26122 Issue For Bids SS-220-1 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation PAGE INTENTIONALLY LEFT BLANK City Project No: 26122 Issue For Bids SS-220-2 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation ITEM SS-221 GEOTEXTILE INTERLAYER FOR BITUMINOUS PAVEMENT OVERLAYS DESCRIPTION 1.1 SECTION INCLUDES A. This specification is applicable to the use of a paving fabric saturated with asphalt cement between pavement layers. B. The function of the paving fabric is to act as a waterproofing and stress relieving membrane for hot mix asphalt concrete overlay. C. The paving fabric shall be suitable for placement on milled, grooved, and smooth surfaces. D. The paving fabric shall be millable and recyclable. 1.2 RELATED SECTIONS A. Item P-101 Preparation/Removal of Existing Pavements B. Item P-401 Asphalt Mix Pavement 1.3 REFERENCES A. American Association of State Highway and Transportation Officials (AASHTO) "Standard Specification for Geotextile Specification for Highway Applications" Designation M 288-17. B. American Society for Testing and Materials (ASTM): • D 276 - Method for Identification of Fibers in Textiles (Melting Point). • D 4354 - Practice for Sampling of Geosynthetics for Testing. • D 4439 -Terminology for Geotextiles. • D 4632—Test Method for Grab Breaking Load and Elongation of Geotextiles. • D 4759 - Practice for Determining the Specification Conformance of Geosynthetics. • D 4873 -Guide for Identification, Storage, and Handling of Geotextiles. • D 5261 -Test Method for Measuring Mass per Unit Area of Geotextiles. • D 6140—Standard Test Method to Determine Asphalt Retention of Paving Fabrics Used in Asphalt Paving for Full-Width Applications. City Project No: 26122 Issue For Bids SS-221-1 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation 1.4 SUBMITTALS A. Submittals of "Shop and Setting Drawings", "Working Drawings", "Catalogue Data" and "Certifications" for review shall be submitted in accordance with appropriate sections of the General Provisions. Submittals and Certifications required are as follows: 1. Catalog data and recent certification, performed at most 1 year prior to the submittal, showing that the asphalt geotextile interlayer and tack coat meet the specified requirements. 2. No sample of the tack coat is required. 3. Manufacturer's installation instructions and general recommendations. B. Product Data: Manufacturer's data sheets on each product to be used, including: 1. Preparation instructions and recommendations. 2. Storage and handling requirements and recommendations. C. Certification: Indicate minimum average roll values or provide annual letter of compliance from accredited third-party testing facility, and tests used to determine those properties. Provide documentation to show that testing has been performed and that the performance requirements have been met. D. List of at least five comparable projects that are similar in terms of size and application, and where the results of using the specific asphalt geotextile interlayer and tack combination can be verified after a minimum of three years of service life. E. Additional information as requested by the Engineer to fully evaluate the product. 1.5 QUALITY ASSURANCE A. Manufacturer Qualifications: 1. Manufacturer with at least 10 years of documented experience in the manufacture and installation of paving interlayers to reduce thermal or load associated cracking distress, and in the manufacture of the tack coat that meets the specification. 2. Manufacturer with documented evidence of an established quality control program to assure products with consistent compliance with the requirements of this specification. Such a program would be ISO 9001 Registration. 3. Annual conformance testing performed by an accredited third-party testing facility. City Project No: 26122 Issue For Bids SS-221-2 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation B. Installer Qualifications: 1. Firm with documented experience in the installation of geotextile interlayer systems with at least two projects of similar construction and scope. 2. Include brief description of each project by name, and phone number of owner's representative knowledgeable in each listed project. C. Pre-Construction Meeting: 1. Prior to construction of geotextile interlayer system, conduct a meeting at the site with the materials supplier, the installer, and the Contractor to review the preparation and installation requirements. 2. Notify the Owner and the Engineer at least 10 days in advance of the time of the meeting. 1.6 DELIVERY, STORAGE, AND HANDLING A. Geotextile labeling, shipment and storage shall follow ASTM D 4873. B. Product labels shall clearly show the manufacturer or supplier name, style name, and roll number. C. Each shipping document shall include a notation certifying that the material is in accordance with the manufacturer's certificate. D. Each geotextile roll shall be wrapped with a material that will protect the geotextile from damage due to shipment, water, sunlight, and contaminants. E. The protective wrapping shall be maintained during periods of shipment and storage. If the wrapping is damaged prior to installation, the outer wrap of geotextile material must be discarded before installation. F. During storage, geotextile rolls shall be elevated off the ground and adequately covered to protect them from the following: Site construction damage, extended exposure to ultraviolet (UV) radiation, precipitation, chemicals that are strong acids or strong bases, flames, sparks, temperatures in excess of 71 deg C (160 deg F) and any other environmental condition that might damage the geotextile. City Project No: 26122 Issue For Bids SS-221-3 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation MATERIALS AND EQUIPMENT 2.1 MATERIALS A. Material shall be certified manufactured in the USA. B. Geotextile Paving Fabric 1. Geotextile construction shall be a needle-punched nonwoven material composed of 100% polypropylene or polypropylene/recycled polyester blend. The paving fabric shall have no tears or defects that will adversely alter its physical properties. The fabric shall be specifically designed for pavement applications and be heat-set on one side. The fabric shall meet the requirements of AASHTO M288-17, Type II paving fabric (or approved equal). 2. In addition, the geotextile shall meet the material properties in Table 1. Table 1 —Material and Strength Properties PROPERTY TEST METHOD UNITS VALUE Mass Per Unit Area' ASTM D 5261 oz/yd2 4.1 Asphalt Retention3 ASTM D6140 gal/yd2 >0.20 Grab Tensile Strength2 ASTM D4632 Ibs >101 Grab Elongation2 ASTM D4632 % >50 Melting Point ASTM D 276 Degrees F 320 1. Minimum Average Roll Value(MARV)values shown represent weaker principal direction 2. Typical (average)values shown represent weaker principal direction 3. Value does not indicate application rate required for construction. C. Tack Coat 1. The sealant material used to impregnate, bond and seal the geotextile to both the base pavement and overlay shall be a paving grade asphalt recommended by the geotextile manufacturer and approved by the Engineer. 2. Uncut asphalt cements are the preferred sealants; however, cationic and anionic emulsions may be used, if approved by the manufacturer and Engineer. The residual asphalt cement must meet project specifications. Cutback and emulsions, which contain solvents, shall not be used. 3. Quantity of the asphalt cement tack coat shall be as recommended by the manufacturer, generally between 0.22 and 0.30 gallons per square yard, depending on the asphalt retention of the paving fabric and the condition of the underlying pavement. City Project No: 26122 Issue For Bids SS-221-4 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation 4. The grade of asphalt cement specified for hot-mix design in each geographic location is generally preferred to use for the tack coat material. 2.2 EQUIPMENT A. The asphalt distributor shall be capable of spraying the asphalt sealant at the prescribed uniform application rate. No streaking, skipping, or dripping will be permitted. The distributor shall also be equipped with a hand spray having a single nozzle and positive shut-off valve. B. Mechanical or manual lay down equipment shall be capable of laying the geotextile smoothly. C. The following miscellaneous equipment shall be provided: stiff bristle brooms or squeegees to smooth the geotextile; scissors or blades to cut the geotextile; brushes for applying asphalt sealant to geotextile overlaps. D. Pneumatic rolling equipment to smooth the geotextile into the sealant, and sanding equipment may be required for certain jobs. Rolling is especially required on jobs where thin lifts or chip seals are being placed. Rolling helps ensure the geotextile bond to the adjoining pavement layers in the absence of heat and weight associated with thicker lifts of asphaltic pavement. CONSTRUCTION METHODS 3.1 PREPARATION A. Do not begin installation of the geotextile interlayer system until existing pavement repairs have been completed and the pavement condition has been evaluated and approved by the Engineer. B. Seal cracks in accordance with Item P-101 of these specifications. C. Surfaces shall be mechanically cleaned by sweeping and vacuuming and be free of oil, vegetation, sand, dirt, water, gravel and other contaminants prior to placement of paving fabric. D. If subgrade preparation is the responsibility of others, notify Engineer of unsatisfactory preparation. Do not begin work until unsatisfactory conditions have been rectified. 3.2 INSTALLATION OF TACK COAT A. Tack coat shall be installed per the recommendations of the geotextile interlayer manufacturer and this specification. Should conflicts arise between manufacturer's recommendations and this specification, they shall be brought to the attention of the Engineer. B. Tack coat shall not be placed when weather conditions are unsuitable in the opinion of the Engineer. Air and pavement temperatures shall be sufficient to allow the asphalt tack coat to hold the geotextile in place. Air temperature shall be 10°C (50°F) and rising for asphalt cement tack coats. Air temperature shall be 15°C (50°F)for asphalt emulsion tack coats are used. City Project No: 26122 Issue For Bids SS-221-5 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation C. The specified rate of tack coat application must be sufficient to satisfy the asphalt retention properties of the geotextile and bond the geotextile and overlay to the old pavement. D. When emulsions are used, the application rate must be increased to offset water content of the emulsion. E. Application of the tack coat shall be by distributor spray bar, with hand spraying kept to a minimum. Temperature of the asphalt sealant shall be sufficiently high to permit uniform spray pattern. For asphalt cements the minimum temperature shall be 150°C (300°F). To avoid damage to the geotextile, however, the distributor tank temperatures shall not exceed 160°C (320°F). F. A spray pattern for asphalt emulsion is improved by heating. Temperatures in the 55°C (130°F) to 70°C(160°F)range are desirable. A temperature of 70°C(160°F)shall not be exceeded since higher temperatures may break emulsion. G. The target width of asphalt tack coat application shall be the geotextile width plus 150 mm (6 in). The asphalt tack coat shall not be applied any farther in advance of geotextile placement than the distance the Contractor can maintain free of traffic. H. Asphalt spills shall be cleaned from the pavement surface to avoid flushing and geotextile movement. I. When asphalt emulsions are used, the emulsion shall be cured prior to placing the geotextile and final wearing surface. This means essentially no moisture remaining. 3.3 INSTALLATION OF GEOTEXTILE PAVING FABRIC A. The geotextile shall be installed per manufacturers recommendations and the requirements of this specifications. Should conflicts arise between manufacturers recommendations and this specification, they shall be brought to the attention of the Engineer. B. The geotextile shall not be placed when weather conditions are unsuitable in the opinion of the Engineer. Air and pavement temperatures shall be sufficient to allow the asphalt tack coat to hold the geotextile in place. For geotextiles installed in conjunction with asphalt cement tack coats, air temperature shall be 10'C (50°F) and rising. Air temperature shall be 15°C (50°F) where asphalt emulsions are used. C. The geotextile shall be placed onto the asphalt tack coat (calendared or smooth side up) with minimum wrinkling prior to the time the asphalt has cooled and lost tackiness. As directed by the Engineer, wrinkles or folds in excess of 25 mm (1 in) shall be slit and laid flat. D. Blooming and/or pneumatic rolling will be required to maximize geotextile contact with the pavement surface. E. Overlap of geotextile joints shall be sufficient to ensure full closure of the joint, but should not exceed 150 mm. Transverse joints shall be lapped in the direction of paving to prevent edge pickup by the paver. A second application of asphalt tack coat to the geotextile overlaps will be City Project No: 26122 Issue For Bids SS-221-6 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation required if in the judgement of the Engineer additional asphalt tack coat is needed to ensure proper bonding of the double geotextile layer. F. Placement of the hot-mix overlay should closely follow geotextile laydown. The asphalt overlay should be placed the same day the paving fabric is installed. The temperature of the overlay mix shall not exceed 160°C (3200F). G. In the event asphalt bleeds through the geotextile causing construction problems before the overlay is placed, the affected areas shall be blotted by spreading sand. H. To avoid movement of, or damage to the tack-coat saturated geotextile, turning of the paver and other vehicles shall be gradual and kept to a minimum. I. Removal and replacement of geotextile that is damaged will be the responsibility of the Contractor. 3.4 MANUFACTURER'S FIELD SERVICES A. A manufacturer's representative shall be present on site for the initial start of the installation of the paving fabric. The contractor shall provide sufficient advanced notification. 3.5 PROTECTION A. Protect installed product until completion of project. B. Repair or replace damaged products before Substantial Completion. METHOD OF MEASUREMENT 4.1 Paving Fabric will be measured by the square yard for completed and accepted paving fabric placed in the locations indicated on the plans. Overlaps and waste will not be included in the measurement. Measurements shall not include areas placed outside the limits shown on the plans. 4.2 The asphalt material for paving fabric tack coat shall not be measured for separate payment. BASIS OF PAYMENT 5.1 Paving fabric, acceptably completed, and measured as provided above, will be paid for at the contract unit price per square yard for"Paving Fabric," which prices shall be full compensation for furnishing and placing all materials; and for all equipment, tools, labor, and incidentals necessary to complete the work. 5.2 The asphalt material for paving fabric tack coat shall not be paid separately but shall be considered incidental to payment items for paving fabric. Payment will be made under: Item SS-221-5.1 Paving Fabric— per square yard END OF ITEM SS-221 City Project No: 26122 Issue For Bids SS-221-7 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation Page Intentionally Left Blank City Project No: 26122 Issue For Bids SS-221-8 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation ITEM SS-300 BASIC ELECTRICAL REQUIREMENTS DESCRIPTION 300-1.1 The Contractor shall maintain current copies of all referenced and applicable standards on the job site. The Contractor is responsible to make known to the Engineer any conflict between plans and specifications that he observes or of which he is made aware. 300-1.2 This work shall consist of lockout/tagout and constant current regulator calibration procedures at the airport electrical vault in accordance with the design and details shown in the plans and in compliance with these specification documents. EQUIPMENT AND MATERIALS 300-2.1 Standards. a. Applicable National Fire Protection Association (NFPA) codes, including but not limited to: (1) NFPA 70- National Electrical Code. (2) NFPA 70E - Standard for Electrical Safety in the Workplace. (3) NFPA 101 - Life Safety Code. (4) Internet Website: http://www.nfpa.org b. Applicable Code of Federal Regulations (CFR)codes, including but not limited to: (1) 29 CFR 1910 - Occupational Safety and Health Standards (OSHA) (2) 29 CFR 1926- Safety and Health Regulations for Construction. (3) Internet Website: http://www.gpoaccess.gov/cfr/index.html C. ANSI/IEEE C2 - National Electrical Safety Code. d. NECA 1 —Standard for Good Workmanship in Electrical Construction. e. Applicable Federal, State and Local Electrical Codes. f. Applicable Federal, State and Local Energy Codes. g. Applicable Federal, State and Local Building Codes. h. Applicable Federal, State and Local Fire Codes. i. Applicable City Electrical Code. j. Applicable City Ordinances pertaining to electrical work. k. Applicable Federal, State and Local - Environmental, Health and Safety Laws and Regulations. Contractor shall utilize the most current editions of standards, which are current at time of bid and as recognized by the Authority Having Jurisdiction for the respective standard. 300-2.2 General. a. Airport lighting equipment and materials covered by Federal Aviation Administration (FAA) specifications shall be certified and listed under Advisory Circular (AC) 150/5345-53, Airport Lighting Equipment Certification Program,current version on the date that the submittals are received by the Engineer. When an equipment advisory circular is being updated and two equipment lists for the same specific equipment are listed in the current certified equipment AC 150/5345-53 addendum, only that equipment qualified to the latest advisory circular will be acceptable. b. Airport lighting equipment and materials shall also meet the Buy American Preference requirements in 49 USC 50101 and the Aviation Safety and Capacity Expansion Act. The equipment shall be approved and listed on the FAA "Equipment Meeting Buy American Requirements" list located at www.faa.gov/airports/aip/procurement/federal_contract_provisions/, current version on the date that the submittals are received by the Engineer, or the Contractor may submit a signed formal letter from the City Project No: 26122 Issue For Bids SS-300-1 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation manufacturer that clearly lists the specific equipment, model number, location where it is manufactured, and statement certifying that the equipment and/or materials meet the Buy American Preference requirements. C. All equipment and materials covered by referenced specifications shall be subject to acceptance through manufacturer's certification of compliance with the applicable specification when requested by the Engineer. All equipment and materials shall be new and meet applicable manufacturer's standards. All electrical components and products shall be tested and listed by an OSHA accepted, nationally recognized testing laboratory (NRTL) to conform to the standards indicated in these contract documents and to the industry standards required in the NEC, NEMA, IEEE, UL, and applicable FAA advisory circulars. d. Manufacturer's certifications shall not relieve the Contractor of the Contractor's responsibility to provide materials in accordance with these specifications and acceptable to the Engineer. Materials supplied and/or installed that do not materially comply with these specifications shall be removed, when directed by the Engineer and replaced with materials, which do comply with these specifications, at the sole cost of the Contractor. e. All materials and equipment used to construct this item shall be submitted to the Engineer for approval prior to ordering the equipment. Submittals consisting of marked catalog sheets or shop drawings shall be provided. Submittal data shall be presented in a clear,precise and thorough manner. Original catalog sheets are preferred. Photocopies are acceptable provided they are as good a quality as the original. Clearly and boldly mark each copy to identify pertinent products or models applicable to this project. Indicate all optional equipment and delete non-pertinent data. Submittals for components or electrical equipment and systems shall identify the equipment for which they apply on each submittal sheet. Markings shall be boldly and clearly made with arrows or circles (highlighting is not acceptable). Contractor is solely responsible for delays in project accruing directly or indirectly from late submissions or resubmissions of submittals. f. The data submitted shall be sufficient, in the opinion of the Engineer, to determine compliance with the Contract Documents plans and specifications. The Engineer reserves the right to reject all equipment, materials or procedures, which, in the Engineer's opinion, does not meet the system design and the standards and codes, specified herein. g. All equipment and materials furnished and installed under this section shall be guaranteed against defects in materials and workmanship for a period of at least twelve(12)months from final acceptance by the Owner. The defective materials and/or equipment shall be repaired or replaced, at the Owner's discretion,with no additional cost to the Owner. (1) All LED guidance signs shall be warranted by the manufacturer for a minimum of 4 years after date of installation,final acceptance testing by the Engineer,and Owner's beneficial use of the equipment, inclusive of all electronics. Refer to FAA Engineering Brief No. 67D for additional requirements. h. After approval of submitted equipment, the Contractor shall supply the following Operation and Maintenance Manual documentation to the Owner. Two (2) complete sets of documentation shall be supplied for each model of equipment. The documentation shall be securely bound in heavy-duty 3-ring binders. The information for each piece of equipment shall be indexed using typewritten label tabs. The spine of each binder shall have a typewritten label, which indicates the included equipment types. The documentation shall include: (1) Approved Submittals and Shop Drawings (2) Cable Splicer Qualifications, Type and Voltage (3) State Contractors License with Electrical Classification (4) Master, Journeyman and Apprentice Electrician Licenses and Certifications (5) Lockout/Tagout Program City Project No: 26122 Issue For Bids SS-300-2 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation (6) Installation Manuals (7) Operation Manuals (8) Maintenance Manuals (9) Parts Lists, including recommended spare parts. Recommended spare parts shall be furnished with the respective equipment. (10) Ground Rod Impedance Test Reports (11) Cable Pulling Tension Value Logs (12) Insulation Resistance Test Reports (13) Regulator Load and Calibration Reports for testing, checking and adjusting all regulators in the electrical vault (14) Bolt torque requirement shop drawings and calculations i. After approval of the O&M Manuals,the Contractor shall provide three(3)complete electronic copies of all documentation in Adobe PDF file format on CD-R (non-rewriteable) discs storage media. The electronic files shall contain searchable text and include a hyperlink index for ease in locating information with the PDF file. j. All requirements herein Item SS-300 shall be applicable to all referenced sections in these contract documents and applicable to all sections, which reference Item SS-300. k. The Contractor is the single source of responsibility for the installation and integration of the airport's lighting, power, and control systems. New airport lighting equipment and materials shall be fully compatible with all other new and existing airport lighting equipment and systems. Any non-compatible components furnished by the Contractor shall be replaced at no additional cost to the Owner with a similar unit that is approved by the Engineer and compatible with the remainder of the airport lighting system. 300-2.3 Operation and maintenance data. Assemble a complete set of operation and maintenance data indicating operation and maintenance of each system, subsystem, and piece of equipment. Provide bound hard copies and electronic copies as noted in section 300-2.2. a. Certificate of Substantial Completion, Release and Contractor's Affidavit, executed copies. b. Final approved equipment submittals, including product data sheets and shop drawings, clearly labeled. C. Installation manuals: Description of function, installation and calibration manuals, normal operating characteristics and limitations, performance curves, engineering data and tests, and complete nomenclature and commercial numbers of all replaceable parts. d. Operations manuals: Manufacturer's printed operating instructions and procedures to include start-up, break-in, routine and normal operating instructions; regulation, control, stopping, shutdown, and emergency instructions; summer and winter operating instructions; and all programming and equipment settings. e. Maintenance manuals: Maintenance procedures for routine preventative maintenance and troubleshooting; disassembly, repair, and reassembly; aligning and adjusting instructions. f. Service manuals: Servicing instructions and lubrication charts and schedules, including the names and telephone numbers of personnel to contact for both routine periodic and warranty service for equipment and materials provided under this Specification. City Project No: 26122 Issue For Bids SS-300-3 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation g. Final test reports, clearly labeled, including but not limited to, insulation resistance test reports, ground rod impedance test reports, cable pulling tension values logs, and equipment certification tests. h. Final certified calibration sheets for all equipment and instruments. i. Preventive maintenance programs for the visual aid facilities and equipment installed in this project, including the applicable equipment sections within Chapter 5 "Preventive Maintenance" from AC 150/5340-26 (latest edition) "Maintenance of Airport Visual Aid Facilities". 300-2.4 Wire. Wire(in conduit)rated up to 5,000 volts shall conform to AC 150/5345-7, Specification for L-824 Underground Electrical Cable for Airport Lighting Circuits. For ratings up to 600 volts, moisture and heat resistant thermoplastic wire conforming to Commercial Item Description A-A-59544A Type THWN-2 shall be used. The wires shall be of the type, size, number of conductors, and voltage shown in the plans or in the proposal. Service, underground feeder, and underground branch circuit wiring shall be minimum Type THHN/THWN- 2 unless otherwise noted. Unless otherwise indicated, conductors No. 10 AWG and smaller shall be solid, and conductors No. 8 AWG and larger shall be stranded. For electrical work of 600 volts or less, all conductors,terminations,terminal blocks, lugs,connectors, devices and equipment shall be listed, marked, and rated 75 degrees C minimum unless otherwise noted. Use pulling means, including fish tape, cable, rope, and basket-weave wire/cable grips that will not damage cables or raceway. Pull ropes and pull wires shall have sufficient tensile strength for the cable(s) to be pulled and installed. Damaged cable or raceway shall be replaced at no additional cost to the Owner. Calculate and do not exceed the maximum allowable pulling tension or maximum allowable sidewall bearing pressure for all conductors and cables. Install pull wires in empty raceways. Use a polypropylene plastic line with not less than 200-pound tensile strength. Secure and leave at least 12 inches of slack at each end of pull wire to prevent it from slipping back into the conduit. Cap spare raceways with removable tapered plugs, designed for this purpose. Colorable L-824 cable in solid non-fading colors may be used for permanent series circuit identification. The color coding shall be continuous throughout the facility and airfield for each series circuit and conductor so that the circuit and conductor are readily identifiable. Mixing of colors for a series circuit is unacceptable. 300-2.5 Conduit. Rigid steel conduit and fittings shall conform to the requirements of Underwriters Laboratories Standard 6, 514, and 1242. 300-2.6 Plastic conduit (for use below grade only). Plastic conduit and fittings-shall conform to the requirements of Fed Spec. W-C-1094 and Underwriters Laboratories Standards UL-651 and shall be one of the following, as shown in the plans: a. Type I - Schedule 40 PVC suitable for underground use either direct-buried or encased in concrete. b. Type II -Schedule 40 PVC suitable for either above ground or underground use. C. Type III-Schedule 80 PVC suitable for either above ground or underground use either direct- City Project No: 26122 Issue For Bids SS-300-4 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation buried or encased in conduit. Plastic conduit adhesive shall be a solvent cement manufactured specifically for gluing the specific type of plastic conduit and fitting. 300-2.7 Tape. Rubber and plastic electrical tapes shall be Scotch Electrical Tape Numbers 23 and 88, respectively, as manufactured by the Minnesota Mining and Manufacturing Company, or an approved equal. The electrical installation shall conform to the requirements of the latest edition of National Fire Protection Association, NFPA-70, National Electrical Code. Copies of the National Electrical Code may be obtained from the National Fire Protection Associations, Inc., One Batterymarch Park, Quincy, Massachusetts 02269. 300-2.8 Concrete. Concrete shall be proportioned, placed, and cured per state department of transportation structural concrete with minimum 25% Type F fly ash, and a minimum allowable compressive strength of 4,000 psi. Mixing Conditions: Concrete shall not be mixed while the air temperature is below 40°F (4°C) without permission of the Engineer. If permission is granted for mixing under such conditions, aggregates or water, or both, shall be heated and the concrete shall be placed at a temperature not less than 50°F (10°C) nor more than 100°F (38°C). The Contractor shall be held responsible for any defective work, resulting from freezing or injury in any manner during placing and curing, and shall replace such work at his/her expense. Placing Concrete: All concrete shall be placed during daylight, unless otherwise approved by the Engineer. Cold Weather Protection: When concrete is placed at temperatures below 40°F (4°C), the Contractor shall provide satisfactory methods and means to protect the mix from injury by freezing. The aggregates, or water, or both, shall be heated to place the concrete at temperatures between 50°F and 100°F (10°C and 38°C). After the concrete has been placed, the Contractor shall provide sufficient protection such as cover, canvas, framework, heating apparatus, etc., to enclose and protect the structure and maintain the temperature of the mix at not less than 50°F (10°C) until at least 60% of the designed strength has been attained. Reinforcing: All reinforcing steel bars shall conform to ASTM A615, Grade 60. Refer to the concrete foundation and footing details in the Plans. Submit professional engineer stamped shop drawings for the required state location for review and approval by the Engineer. CONSTRUCTION METHODS 300-3.1 Lockout/tagout program. The Contractor shall provide a complete copy of an electrical energy source Lockout/Tagout Program to the Owner, with copy to the Engineer. The document shall clearly identify the on-site master electricians and their contact information, including office and mobile telephone numbers. The Lockout/Tagout Program shall comply with Part 1910 — Occupational Safety and Health Standards (OSHA)Subpart S—Electrical, and meet the requirements of 29 CFR 1910.147, The Control of Hazardous Energy (Lockout/Tagout), including requirements listed in 1910.331 through 1910.335. Implementation of the Lockout/Tagout Program and all other related safety requirements are the sole responsibility of the Contractor. City Project No: 26122 Issue For Bids SS-300-5 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation 300-3.2_Safety program. The Contractor shall implement an electrical safety program that complies with NFPA 70E and 29 CFR 1926. Implementation of the Electrical Safety Program, determining and providing proper Personal Protective Equipment (PPE), training and enforcing personnel to wear the prescribed PPE, conducting work area safety inspections (including correcting deficiencies), and all other related safety requirements are the sole responsibility of the Contractor. All work involved in the preparation and implementation of the safety program will not be measured for separate payment but will be considered subsidiary to the lockout/tagout bid item. 300-3.3 Preconstruction meeting. A preconstruction meeting will be held with the Airport, FAA, Engineer and Contractor, prior to any work. Complete submittals and shop drawings will be submitted at this time for review. An equipment procurement schedule will be provided by the Contractor with an anticipated field construction start date. The progress construction schedule will be submitted for review each week and shall outline all installation, testing and demolition work. 300-3.4 General. In general, the various electrical equipment and material to be installed by the various trades under this specification shall be run as indicated, as specified herein, as required by particular conditions at the site, and as required to conform to the generally accepted standards to complete the work in a neat and satisfactory manner. The following is a general outline concerning the running of various systems and is to be expected where the drawings or conditions at the buildings necessitate deviating from these standards. The drawings and specifications are complementary; any work required by one, but not by the other, shall be performed as though required by both. The Contractor shall maintain copies of all equipment installation manuals on site during construction. The electrical plans do not give exact locations, etc., and do not show all the offsets, control lines,junction boxes, and other installation details. Each Contractor shall carefully lay out his work at the site to conform to the job conditions, to conform to details of installation supplied by the manufacturers of the equipment to be installed, and thereby to provide complete operating systems. The electrical plans show diagrammatically the locations of the various electrical outlets and apparatus and the method of circulating and controlling them. Exact locations of these outlets and apparatus shall be determined by reference to the general plans and to all detail drawings, etc., by measurements at the buildings, and in cooperation with other crafts, and in all cases shall be subject to the approval of the Engineer. The Engineer reserves the right to make any reasonable change in location of any outlet or apparatus before installation, without additional cost to the Owner. Should the particular equipment which any bidder proposes to install require other space conditions than those indicated on the Drawings, he shall arrange for such space with the Engineer before submitting his bid. Should changes become necessary because of failure to comply with this clause, the Contractor shall make such changes at the Contractor's expense. Should the particular equipment which any bidder proposes to install require other installation methods, such as larger light base junction structures, etc., he shall include all such equipment and appurtenances in his bid. Should changes become necessary because of failure to coordinate equipment requirements and comply with this clause, the Contractor shall make such changes at the Contractor's expense. City Project No: 26122 Issue For Bids SS-300-6 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation The Contractor shall be responsible to see that each party furnishes electrical equipment which meets the electrical requirements specified herein and that all systems work together to produce the specified operation. Where two or more units of the same kind or class of equipment are required, these shall be products of a single manufacturer; however, the component parts need not be the products of one manufacturer. Each Contractor shall submit working scale drawings of all his apparatus and equipment which in any way varies from these Specifications and Plans, which shall be checked by the Engineer and approved before the work is started, and interferences with the structural conditions shall be corrected by the Contractor before the work proceeds. Electrical equipment, such as switchgear, switchboards, panelboards, load centers and other power supply equipment, shall not be used as a common enclosure, pull box or junction box for routing conductors of different systems, unless the equipment is specifically designed for this purpose and indicated as such on the Plans. All electrical equipment shall be securely mounted as indicated in the plans, as required by the contract specifications, as required by guidelines and codes, and as required by the manufacturer using hardware compliant with the environmental conditions. Interior components of electrical enclosures shall be securely mounted using appropriate hardware within the enclosure. Adhesives or adhesive tapes/strips are not allowed and are prohibited. Electrical components, including but not limited to, relays, circuit boards, electronics, etc., shall be installed within approved enclosures. The Contractor shall keep ends of conduits, including those extending through roofs,equipment and fixtures covered or closed with caps or plugs to prevent foreign material from entering during construction. Where portions of raceways are known to be subjected to different temperatures, where condensation is a problem, and where passing from interior to exterior of a building, the portion of raceway or sleeve shall be filled with an approved material to prevent the circulation of air, prevent condensation,and prevent moisture entry. Sealing of raceways shall not occur until after the conductors and cables have been installed,tested and accepted by the Engineer. The Contractor shall install any temporary lines and connections required to maintain electric services and safely remove and dispose of them when complete. All temporary wiring shall conform to OSHA standards. Remove temporary services when work is complete. Any damage to electrical equipment caused by the Contractor shall be repaired at no cost to the Owner. All non-current carrying parts and neutrals shall be grounded as indicated on the Drawings or as required by the Codes. White and/or gray outer finish conductors may only be used as grounded conductors or neutral conductors in accordance with NEC. Install insulated green equipment grounding conductors with all feeder and branch circuits. Provide separate insulated equipment grounding conductors from grounding system to each electrical equipment, telecommunication equipment, other special electrical system equipment, and appurtenance item location in accordance with NFPA 70 and other applicable standard requirements. City Project No: 26122 Issue For Bids SS-300-7 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation The bidder shall inspect the site, thoroughly acquaint himself with conditions to be met and work to be accomplished. Failure to comply with this shall not constitute grounds for any additional payments. Where electrical equipment is installed that causes electrical noise interference with other systems either existing or installed under this contract, the offending equipment shall be equipped with isolating trans- formers, filters, reactors, shielding, or any other means as required for the satisfactory suppression of the interferences, as determined by the Engineer. All junction boxes, expansion joints, flexible connections, instruments and similar items requiring servicing or repairs shall be installed in an accessible location. All salvage and equipment removed by the work shall remain the property of the Owner. Material removed from the project shall be stored on the project site where and as directed. Debris shall be removed from the job site and disposed of by the Contractor. The Contractor shall maintain his work area clean and orderly at all times. Debris shall be removed promptly. The electrical system shall be thoroughly cleaned inside and outside of all enclosures to remove all metal shavings or other work debris, dust, concrete splatter, plaster, paint and lint. The Contractor shall do all excavating and backfilling made necessary by electrical work and shall remove all surplus or supply any earth required to establish the proper finished grade. The Contractor shall do all cutting and patching made necessary by electrical work, but in no case shall he cut through or into any structural member without written permission of the Engineer. All steel conduits, supports, channels, fittings, nuts, bolts, etc. shall be galvanized, corrosion-resistant type unless otherwise noted. An approved anti-seize compound shall be used on all threads to prevent equipment and thread damage. Equipment shall be installed in accordance with manufacturer's recommendation. Make all final electrical connections and coordinate all items with other trades. Correct unnecessary damage caused due to installation of work, brought about through carelessness or lack of coordination. All openings, sleeves, and holes to be properly sealed, fire proofed and waterproofed. Any water leaks arising from project construction will be immediately corrected to the satisfaction of the Owner and the Engineer. 300-3.5 Power supply equipment. Electrical equipment, such as switchgear, switchboards, panelboards, load centers, and other power supply equipment, shall not be used as a common enclosure, pull box or junction box for routing conductors of different systems, unless the equipment is specifically designed for this purpose and indicated as such on the Plans. If shown in the plans, the power supply equipment shall be set on concrete housekeeping pads to provide a minimum space of 3-1/2 inches between the equipment and the floor. All equipment shall be secured to the floor or wall in accordance with the manufacturer's recommendations and these contract document requirements. 300-3.6 Duct and conduit. Conduits shall be galvanized rigid steel unless otherwise indicated or specified. Refer to one-line diagram conduit notes for specific requirements. Conduit runs shall be one trade size continuously with no reducers allowed. Changing of conduit size is only permitted at manholes, handholes, and boxes and conduit bodies used as outlet, device,junction, or pull boxes, including approved, listed fittings with removable covers. City Project No: 26122 Issue For Bids SS-300-8 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation Use an approved, listed adapter/coupling to convert to other types of conduit. Reducer couplings are not allowed. For underground service entrance,feeder and branch circuit raceways, offsets and bends over 30 degrees and elbows in Schedule 40 PVC conduit runs shall be Schedule 80 PVC conduit. Underground service entrance PVC conduits shall be concrete encased unless otherwise noted. Underground PVC conduits shall be concrete encased under driveways, roadways, parking lots and other paved areas. Non-encased conduits shall convert to concrete encased ducts under all paved areas and shall extend at least 3 feet beyond the edges of the pavement unless otherwise noted. The Contractor shall provide a staked centerline or offset for the duct and manhole system - utilizing the drawings and a site inspection of the existing grounds, grades and utility crossings. The Owner and Engineer shall approve the staking plan that shall be indicated on a drawing submitted for approval before starting any excavation for the ducts. The staking plan shall indicate the proposed location, elevation and dimensions of manholes and handholes. The Engineer reserves the right to adjust duct, manhole and handhole locations and elevations before installation at no additional cost to the Owner. The bottom surface of trenches shall be essentially smooth and free from coarse aggregate. Install grounding-and-bonding type bushings and bonding jumpers on all service entrance conduits and on all feeder and branch circuit conduits. Use conduit bushings at each conduit termination. Where No.4 AWG or larger ungrounded wire is installed, use insulated bushings. When EMT is allowed, utilize only steel compression fittings. Die-cast and set-screw fittings shall not be used. Use double lock nuts at each conduit termination. Use weather tight hubs in damp and wet locations. Sealing lock nuts shall not be used. Grounding continuity to rigid metal conduit shall be accomplished by grounding bushings/adapters with lugs for connection to grounding counterpoise and/or grounding electrode conductor as defined by NEC. All exposed wiring shall be run in not less than 1/2 inch (12 mm) galvanized rigid steel conduit. All conduits shall be installed to provide for drainage. Conduit shall be attached to wooden structures with galvanized pipe straps and fastened with galvanized wood screws not less than No. 8 nor less than 1-1/4 inches (31 mm) long. There shall be at least two fastenings for each 10-foot(3 m) length. Existing ducts may require clearing before use. It is the responsibility of the Contractor to locate the existing ducts, identify empty or partially empty conduits and clear the conduits as required. Where new cable is to be installed in existing duct,the full length of the duct shall be cleared of debris by mechanical means before the installation of the new cable. Acceptable methods of clearing existing ducts include "hydro-jetting"and "roto-rooting." All existing cables in each re-used duct shall be replaced for the length of the duct and properly spliced in a method approved by the Engineer. Clearing of existing duct banks or conduits is incidental to the cable pay item. Dedicated ground rods shall be installed and exothermically welded to the counterpoise wire at each end of a duct bank crossing under pavement. For concrete markers, the impression of letters shall be done in a manner, approved by the Engineer, to affect a neat, professional appearance. The letters shall be stenciled neatly. After placement, all markers shall be given one coat of high-visibility aviation orange paint, as approved by the Engineer. City Project No: 26122 Issue For Bids SS-300-9 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation 300-3.7 Junction boxes. Junction cans shall have both internal and external ground lugs. Size (diameter) and depth shall be as specified in the plans. Galvanized cans shall have an external ground lug for mechanical connection/bolting ground clamps bonding. 300-3.8 Backfill, compaction, and restoration. Refer to the backfill, compaction and restoration requirements within Item P-152 where other compaction requirements are specified (under pavements, embankments, etc.) Trenches shall be backfilled and compacted in 6" layers to 90% maximum density for cohesive soils and to 100% maximum density for non-cohesive soils, as determined by ASTM D1557. The in-place field density shall be determined in accordance with ASTM D1556, D2167, or D6938. Backfilling from two directions will not be allowed. No backfilling will be accomplished without the approval of the Engineer or Construction Observer. The Contractor shall ensure all trenches are inspected prior to being covered and prior to encasement. Any uninspected trenches which are prematurely covered shall be exposed for inspection at the Engineer and Owner's convenience at no additional cost to the Owner. The Construction Observer will coordinate with the Contractor for advance scheduling of trench inspection. Following restoration of all trenching near airport movement surfaces, the Contractor shall thoroughly visually inspect the area for foreign object debris(FOD)and remove any such FOD that is found. This FOD inspection and removal shall be considered incidental to the pay item of which it is a component part. 300-3.9 Cable and utility coordination. The existing and the proposed locations of lighting cable are approximate. The Contractor shall be responsible for field locating and identifying the existing lighting circuits to determine their exact routing. The Contractor shall also be responsible for maintaining the lighting systems in a working condition until the new lighting circuits have been installed and tested. The Contractor shall proactively and expeditiously accomplish this cable identification work prior to performing any modifications to the lighting circuits. Coordinate identification work with the Owner and Engineer and make all corrections, additions, etc. on the as-built drawings. Underground cable and utilities exist within and adjacent to the limits of construction. An attempt has been made to locate these cables and utilities on the Plans. All existing cable and utilities may not be shown on the Plans and the location of the cables and utilities shown may vary from the location shown on the Plans. Prior to beginning of any type of excavation, the Contractor shall contact the utilities, the airport maintenance staff, FAA field personnel and other organizations as required and make arrangements for the location of the utilities on the ground. The Contractor shall maintain the cable and utility location markings until they are no longer required. The Contractor shall replace or repair any underground cable or utility that has been damaged by the Contractor during excavation to the satisfaction of the owner of the cable or utility at no additional cost to the Owner. The Contractor shall be responsible for all coordination work associated with existing and new utilities, their marking, their identification, proposed outages/shutoffs, connections, cutovers, etc. 300-3.10 Wiring. The Contractor shall furnish all labor and materials and shall make complete electrical connections in accordance with the wiring diagram furnished with the project plans. The electrical installation shall conform to the requirements of the latest edition of National Fire Protection Association, NFPA-70, National Electrical Code. City Project No: 26122 Issue For Bids SS-300-10 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation All new electrical cable shall be marked using color-coded plastic electrical tape, which is specifically designed for application on polyethylene-jacketed cable. The tape shall be applied as detailed on the Plans. Marking tape shall be Scotch 35 Vinyl Plastic tape or approved equal. 300-3.11 Marking and labeling_ Properly identify all electrical equipment. Wire/Cable Designation Tape Markers: a. Indoor Dry Locations: UL Recognized Materials, vinyl or vinyl-cloth, self-adhesive, wraparound, self-laminating, cable/conductor markers with computer printer-generated numbers and letters, minimum 1"width. Provide Brady B-427 with thermal transfer print type or approved equal. b. Outdoor Locations and Indoor Wet and Damp Locations: White polyolefin, non-adhesive, full circle, heat-shrinkable sleeve, cable/conductor markers with computer printer-generated numbers and letters, minimum 1"width. Provide Brady B-342 with thermal transfer print type or approved equal. Properly identify all electrical equipment, including but not limited to the following: a. Switchgear, switchboards, and control panels. b. Main distribution panel and individual devices within it. C. Panelboards and individual devices within it. d. Safety switches and disconnects. e. Contactors and lighting control center, including all branch circuits. f. Individually mounted circuit breakers. g. Starters and relays. h. Transformers. i. Generators and automatic transfer switches. Use permanently attached black phenolic plates with 3/8" white engraved lettering on the face of each, attached with minimum two sheet metal screws. Starters and relays connected under this Specification shall be identified whether furnished under this Specification or under other Specifications of this contract. Plates shall be indoor or outdoor rated as required by installation location. Panelboard identification plates shall indicate panel by identification name, voltage system, ampacity rating and type, AIC rating, and feeder source description. Identify each receptacle, light switch, junction box, etc. with panelboard identification and circuit number. For all wiring device covers, use hot, stamped, or engraved machine printing with black-filled lettering on face of plate, and durable wire markers or tags inside outlet boxes. Identify fire alarm junction boxes with red covers and mechanical control junction boxes with blue covers. Install all identification as required by current adopted editions of the NFPA 70 - National Electrical Code and NFPA 70E- Standard for Electrical Safety in the Workplace. 300-3.12 Removal and relocation of existing equipment. The Contractor shall carefully remove all salvageable equipment as indicated on the Plans. Any equipment which is damaged during the removal operation shall be subject to a reduction in payment for removal of the equipment. All equipment which is removed during this project shall be transported to a site on the Airfield or removed from the Airfield and properly disposed of as directed by the Owner and the Engineer. The Contractor shall carefully relocate existing equipment as indicated in the Plans. Any equipment that is damaged during the relocation operation shall be replaced at no additional cost to the Owner. City Project No: 26122 Issue For Bids SS-300-11 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation Any existing electrical equipment, conduit, cables, etc. that is damaged during construction shall be replaced at no additional cost to the Owner to the satisfaction of the Owner and the Engineer. 300-3.13 5 kv and under 600v cable connections. Cable splicing/terminating personnel shall be licensed electricians who have the minimum continuous experience in terminating/splicing medium voltage cable as listed in Item L-108. The qualifications for these airfield lighting cable splicers shall be submitted for review and approval by the Engineer prior to any work. The Engineer may request sample splices be performed in his presence by the proposed personnel to clearly demonstrate that they have the skill and experience to perform this work. Connector kits and cables shall be provided in sufficient quantity by the Contractor in demonstrating these qualifications at no additional cost to the Owner. Field-attached plug-in splices using FAA certified L-823 plug and receptacle connector kits, properly sized to the cable being used, shall be installed as shown in the plans. This work shall include the taping and heat shrinking. Refer to Item L-108 for additional requirements. As an option, the Contractor may utilize enhanced FAA certified L-823 connector kits, such as the Amerace 54Super Kit. These kits do not require taping or heat shrinking. These kits shall be installed in accordance with the manufacturer's installation requirements. Note that the mixing of connector kits is unacceptable. The Contractor shall clearly list and submit the connector kits he proposes to utilize on the project for approval prior to any field construction work, and he shall only install that type during construction unless otherwise noted by the Engineer. For under 600V cable connections of voltage powered circuits, splices whether direct buried or within an underground enclosure shall only utilize approved cast splices, employing a plastic mold and using epoxy resin equivalent to that manufactured by 3M Company, or an approved equivalent. 300-3.14 Certification and performance. Equipment and materials covered by FAA Advisory Circulars are referred to by item numbers and approved equipment is listed within the AC 150/5345-53 Airport Lighting Equipment Certification Program's monthly Addendum, which contains a complete and updated listing of the certified equipment and manufacturers and is listed in the FAA Buy American Preference equipment list, which is also updated monthly. The Contractor shall provide and install new certified equipment that works reliably and efficiently with the existing equipment to remain in service. The Contractor shall provide any additional accessories and/or appurtenances required to provide fully functional electrical systems to the satisfaction of the Owner and Engineer, at no additional cost to the Owner. The Contractor shall ascertain that all lighting system components furnished (including FAA certified and approved equipment) are compatible in all respects with each other and the remainder of the new and existing systems. Any non-compatible components furnished by the Contractor shall be replaced at no additional cost to the Owner with a similar unit that is approved by the Engineer and compatible with the remainder of the airport lighting system. 300-3.15 As-built drawings. The Contractor shall keep one (1) full-sized set of prints for As-Built Drawings at the site, in good order, and annotated to show all changes made during the construction process. The Contractor shall locate all underground and concealed work, identifying all equipment, conduit, circuit numbers, motors, feeders, breakers, switches, and starters. The Contractor will certify accuracy by endorsement. As-Built drawings shall be correct in every detail, so Owner can properly operate, maintain, and repair exposed and concealed work. The As-Built drawings shall indicate all control system labeling and marking. City Project No: 26122 Issue For Bids SS-300-12 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation The Contractor shall store the As-Built drawings on the site. Drawings shall not be rolled. Make corrections, additions, etc., with pencil, with date and authorization of change. As-Built drawings must be submitted to Engineer before project will be accepted. Minor deviations from the Plans and Specifications shall be as approved by the Engineer. Upon completion of the installation, the Contractor shall adjust the systems to the satisfaction of the Engineer. 300-3.16 Testing. General Electrical Testing: Perform each visual and mechanical inspection and electrical test stated in NETA Acceptance Testing Specification and certify compliance with test parameters. Tests shall be conducted in the presence of the Engineer and shall be to his/her satisfaction. Correct malfunctioning units on-site,where possible,and retest to demonstrate compliance;otherwise, replace with new units and retest. Perform infrared scan tests and inspections of service and power distribution equipment at the respective buildings and provide reports. Electrical equipment will be considered defective if it does not pass tests and inspections. Reports shall include notations of deficiencies, remedial action taken and observations after remedial action. System and Equipment Testing: All installations shall be fully tested by continuous operation for not less than 24 hours as completed systems prior to acceptance. These tests shall include the functioning of each control not less than 10 times. Test equipment and instruments utilized by the Contractor shall have been calibrated following the manufacturer's recommended schedule to verify their accuracy prior to performing the testing work. The Contractor shall provide instrument calibration certificates on test equipment when requested by the Engineer. Retesting work due to inaccurate or defective instruments shall be performed by the Contractor to the satisfaction of the Engineer at no additional cost to the Owner. a. Regulator Calibration: The Contractor shall check and calibrate existing regulators utilizing the enclosed "Constant Current Regulator Calibration Report". Refer to the material section on constant current regulators for additional requirements. New regulators are calibrated at the factory prior to shipping, while existing regulators typically need checks and calibrations on a routine basis so that they do not get out of tolerance. The intent is to check and/or calibrate these regulators using a high accuracy meter prior to energizing and placing the airfield lighting system in service. Utilize a high accuracy true RMS ammeter with high accuracy clamp-on current probe when making these measurements (use round type probes, accuracy + or—2% required, sized per the cable diameter and circuit ampacity to achieve the best accuracy). Adjust regulators per manufacturer's instructions to meet the output currents on each brightness step as listed in Tables 5-2 and 5-3 in AC 150/5340-26. b. Megger Testing: The Contractor shall perform megger testing on each existing regulator circuit prior to any work on the electrical system. This information shall be recorded and documented by the Contractor and submitted to the Engineer. The Contractor shall perform megger tests on each regulator circuit after the acceptance test period. This acceptance test information City Project No: 26122 Issue For Bids SS-300-13 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation shall be recorded and documented by the Contractor and submitted to the Engineer. Megger test shall be performed in accordance with the requirements of Item L-108. The Contractor shall submit his initial megger test reports on the enclosed "Insulation- Resistance Test Report" form prior to any work on the electrical system. This report shall be submitted to the Engineer and approved by the Owner prior to Contractor proceeding with his work. After final acceptance testing has been completed, the Contractor shall complete and submit his final megger test reports to the Engineer and insert copies of the initial and final megger test reports in the Operation and Maintenance Manuals. Megger testing shall be performed using an insulation meter, such as a Fluke 1507 Insulation Resistance Multimeter, Ideal 61-797 Digital Insulation Meter, or approved equal having an insulation test range up to 10 Gigohms or greater. Insulation resistance testers for 5kV series circuits shall utilize the 1000V DC source output for testing. The test equipment shall be submitted for review and approval by the Engineer prior to performing the tests. The Contractor shall be responsible to maintain an insulation resistance equal to minimum 80% of the initial testing value through the end of the contract warranty period. This requirement is based on AC 150/5340-26C which states that resistance values inevitably decline over the service life of the circuit and that a 10-20 percent decline per year is considered normal. Note that AC 150/5340-26C cancels AC 150/5340-2613; thus, refer to the current edition of the maintenance AC for requirements in this project. For existing circuit insulation resistance requirements, refer to"Existing Circuits"section of Item L-108. The insulation resistance to ground for 600V rated cables shall be not less than 100 Megohms when measured per NETA standards. The installations shall be tested in operation as a completed unit prior to acceptance.Tests shall include taking megger and voltage readings in accordance with manufacturer's requirements. Testing equipment shall be furnished by the Contractor. C. Ground Rod Impedance Testing: The enclosed "Ground Rod Impedance Test Report" form shall be used, and testing shall be performed in the presence of the Engineer. As-Built drawings shall indicate the location of all installed ground rods. Each ground rod shall have a unique identifier that corresponds with its submitted ground impedance test report. Three-pole fall-of-potential testers that can measure the ground resistance of a ground rod using auxiliary electrodes(staked testing),such as a Fluke 1621 Earth Ground Tester,shall be used for testing individual dedicated equipment ground rods at fixtures and equipment, or for testing isolated counterpoise ground rods not yet connected to the counterpoise wire. Clamp-on testers that can measure the ground resistance of a ground rod without using auxiliary ground rods (stakeless testing), such as a Fluke 1630 Earth Ground Clamp Meter or approved equal, shall be used for testing counterpoise ground rods which have already City Project No: 26122 Issue For Bids SS-300-14 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation been connected to the counterpoise wire, or ground ring ground rods which have already been connected to the established ground ring system. Ground impedance test equipment shall be submitted for review and approval by the Engineer prior to performing the tests. If the ground rod's impedance exceeds 25 ohms, an additional rod shall be driven in a location suitable and approved by the Engineer. However, the additional rod must satisfy the requirements of NEC 250.53 and not be less than 6 feet away from any other ground rod electrode. Additional ground rods shall not be measured for separate payment but shall be considered subsidiary to the counterpoise or respective equipment pay item. The Contractor shall perform additional tests if required and requested by the Engineer at no additional cost. The Contractor shall coordinate with the resident Engineer to approve tests daily before proceeding. The Contractor shall fill out a separate test report for each date. Test reports shall be submitted weekly to the Engineer. d. Cable Pulling Tension Values Log: The enclosed "Cable Pulling Tension Values Log"form shall be used for monitoring cable pull tension values in the presence of the Engineer. Airport lighting equipment and special systems shall be tested in accordance with applicable FAA Advisory Circular requirements and the manufacturer's installation instructions. These tests shall also include those system requirements listed within AC 150/5340-26 Maintenance of Airport Visual Aid Facilities. 300-3.17 Inspection fees and permits. The Contractor shall obtain and pay for all necessary construction permits, licenses, government charges, and inspection fees necessary for prosecution of the Work. Unless otherwise noted, the Contractor shall pay all charges of utility owners for connections for providing permanent service to the Work, ready for subsequent utility account transfer to the Owner after final acceptance. 300-3.18 Work supervision. State of Texas: The electrical contractor (whether the general contractor or a subcontractor) shall be a licensed contractor in the state of Texas having an electrical classification suitable for performing the work required in these contract documents. The Contractor shall designate in writing the qualified electrical supervisor who shall provide supervision to all electrical work on this project. The minimum qualifications for the electrical supervisor shall be a master electrician as defined by the Texas Electrical Safety and Advisory Board. The supervisor or his appointed alternate possessing at least a journeyman electrician license shall be on site whenever electrical work is being performed. The qualifications of the electrical supervisor shall be subject to approval of the Owner and the Engineer. All master and journeyman electricians shall be licensed in accordance with Texas Board Requirements. The website located at https://tdlr.texas.gov publishes the text of this statutory requirement. No unlicensed electrical workers shall perform electrical work on this project. Apprentice electricians in a ratio of not more than one apprentice per journeyman electrician will be allowed if the apprentices are licensed and actively participating in an apprenticeship program recognized and approved by the State of Texas. City Project No: 26122 Issue For Bids SS-300-15 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation 300-3.19 Training. The training classes shall be coordinated with the Owner and Engineer in advance of the final acceptance testing. Comprehensive operational and maintenance training materials shall be provided by the equipment manufacturer and the Contractor (see section 2.3 OPERATION AND MAINTENANCE DATA). Schedule the training with the Owner at least 10 days in advance and notify the Engineer. Provide hands-on demonstrations and training of equipment components and functions, including adjusting, operating and maintaining the lighting equipment and systems. Coordinate the training schedule with the Owner in advance, so that the Owner may record the training if desired. METHOD OF MEASUREMENT 300-4.1 The quantity of lockout/tagout and constant current regulator calibration procedures to be paid for shall consist of all lockout/tagout procedure work and all constant current regulator calibration work completed in place, accepted and ready for operation. This item does not include measurement for constant current regulator equipment. BASIS OF PAYMENT 300-5.1 Payment will be made at the contract unit price for each complete item, measured as provided above, and accepted by the Engineer. This price shall be full compensation for furnishing all materials and for all preparation, assembly, and installation of these materials, and for all labor, equipment, tools, and incidentals necessary to complete this item to the satisfaction of the Engineer. Payment will be made under: Item SS-300-5.1 Lockout/Tagout and Constant Current Regulator Calibration Procedures — per Lump Sum City Project No: 26122 Issue For Bids SS-300-16 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation MATERIAL REQUIREMENTS Commercial Item Description A-A-59544 Cable and Wire, Electrical (Power, Fixed Installation) Fed. Spec. W-C-1094 Conduit and Conduit Fittings; Plastic, Rigid Fed. Spec. W-P-115 Panel, Power Distribution Fed. Std. 595 Colors Underwriters Rigid Metal Conduit Laboratories Standard 6 Underwriters Fittings for Conduit and Outlet Boxes Laboratories Standard 514 Underwriters Laboratories Schedule 40 and 80 Rigid PVC Conduit(for Direct Burial) Laboratories Standard 651 Underwriters Intermediate Metal Conduit Laboratories Standard 1242 CFR 1910 Occupational Safety and Health Regulations CFR 1926 Safety and Health Regulations for Construction ANSI/IEEE C2 National Electrical Safety Code NFPA 70 National Electrical Code (NEC) NFPA 70E Standard for Electrical Safety in the Workplace NFPA 101 Life Safety Code NFPA 780 Standard for the Installation of Lightning Protection Systems 29 CFR 1910 Occupational Safety and Health Standards (OSHA) 29 CFR 1926 Safety and Health Regulations for Construction Jaquith Industries, Inc. The Design, Installation, and Maintenance of In- Pavement Airport Lighting City Project No: 26122 Issue For Bids SS-300-17 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation FAA ADVISORY CIRCULARS AC 150/5300-13 Airport Design AC 150/5340-18 Standards for Airport Sign Systems AC 150/5340-26 Maintenance of Airport Visual Aid Facilities AC 150/5340-30 Design and Installation Details for Airport Visual Aids AC 150/5345-7 Specification for L-824 for Underground Electrical Cable for Airport Lighting Circuits AC 150/5345-10 Specification for Constant Current Regulators and Regulator Monitors AC 150/5345-26 Specification for L-823 Plug and Receptacle, Cable Connectors AC 150/5345-42 Specification for Airport Light Base and Transformer Housings, Junction Boxes, and Accessories AC 150/5345-44 Specification for Taxiway and Runway Signs AC 150/5345-46 Specification for Runway and Taxiway Light Fixtures AC 150/5345-47 Isolation Transformers for Airport Lighting Systems AC 150/5346-49 Specification L-854, Radio Control Equipment AC 150/5345-53 Airport Lighting Equipment Certification Program END OF ITEM SS-300 City Project No: 26122 Issue For Bids SS-300-18 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation CONSTANT CURRENT REGULATOR CALIBRATION REPORT Standard Requirements: FAA AC 150/5340-26(latest edition)Maintenance of Airport Visual Aid Facilities Owner/Sponsor: Engineer: Garver, LLC Airport: Contractor: Project Title: Garver Project Number: Vault ID/Location: Date: Weather/Site Conditions: Last Two Weeks of Rain: inches Constant Current Regulator#: Serves: Completed Comments 1. Check all control equipment for proper operation. ❑ 2. Perform short-circuit test. Record results and ❑ recalibrate if necessary. 3. Perform open-circuit test on regulators with open ❑ circuit protection.Open circuit protective device should de-energize the regulator.Record results. 4. Check and record regulator input voltage and current. ❑ Input Voltage: Input Current: 5. Check and record regulator output load. ❑ (ONLY if regulator has monitoring package) Volt-Amperes: 6. Check and record output current on each brightness ❑ step. If output current is outside of the allowable range, adjust the regulator's on-board potentiometer to re-calibrate the output current within the allowable range. Re-record the new output current on this form. 3-Step CCR 5-Step CCR B10: B30: B100: 1: 2: 3: 4: 5: Nominal: 4.8A 5.5A 6.6A 2.8A 3AA 4.1A 5.2A 6.6A Tested By: (Signature and Date) Test Equipment: (Manufacturer and Model No.) Engineer Witness: (Signature and Date) Owner/Sponsor Witness: (Signature and Date) City Project No: 26122 Issue For Bids SS-300-19 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation INSULATION RESISTANCE TEST REPORT Owner/Sponsor: Engineer: Garver, LLC Airport: Contractor: Project Title: Garver Project Number: Vault ID / Location: Date Initial/ Final Tests: Weather/Site Conditions (Initial Test): Last Two Weeks of Rain: inches Weather/Site Conditions (Final Test): Last Two Weeks of Rain: inches Initial Test Results Final Test Results Circuit Designation Regulator Megger Reading Before Regulator Megger Reading After and Color Code Size (kW) Field Work (Megohms) Size (kW) Field Work (Megohms) 1 2 3 4 5 6 Tested By: Test Equipment: Engineer Witness: Owner/Sponsor Witness: Provide signature/date and manufacturer/model no. as required in the fields above. Initial Test Record—Owner Disposition Owner/Sponsor: (Signature and Date) Check one only: ❑ Proceed with Installation ❑ Hold City Project No: 26122 Issue For Bids SS-300-20 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation GROUND ROD IMPEDANCE TEST REPORT Owner/Sponsor: Engineer: Garver, LLC Airport: Contractor: Project Title: Garver Project Number: Date: Weather/Site Conditions: Fall-of-Potential Style Tester(F): Manufacturer: Model#: Clamp-On Style Tester(C): Manufacturer: Model#: Test Impedance Test Impedance Ground Rod # Equipment Value Ground Rod # Equipment Value Style F or C Ohms Style F or C Ohms Tested By: Engineer Witness: Provide signature/date in the fields above. Page of City Project No: 26122 Issue For Bids SS-300-21 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation CABLE PULLING TENSION VALUES LOG Owner/ Sponsor: Engineer: Garver, LLC Airport: Contractor: Project Title: Garver Project Number: Date: Weather/Site Conditions: Dynamometer Cable/Wire Manufacturer/Model #: Manufacturer: Wire/Cable Length of Maximum Measured From /To Locations Size Pull Pull Method Value Value Tested By: Engineer Witness: Provide signature/date in the fields above. Page of City Project No: 26122 Issue For Bids SS-300-22 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation ITEM SS-301 ELECTRICAL DEMOLITION WORK DESCRIPTION 301-1.1 This item shall consist of the removal and satisfactory disposal of existing runway guidance signs and other incidentals, all of which are not designated or permitted to remain, in accordance with this specification, the referenced specifications and drawings, and applicable advisory circulars. This work shall include the removal of indicated equipment, materials, and incidentals necessary for a complete item removal, including all restoration work, as a completed unit to the satisfaction of the Engineer. 301-1.2 The Contractor shall maintain current copies of all referenced and applicable standards on the job site. The Contractor is responsible to make known to the Engineer any conflict between plans and specifications that he observes or of which he is made aware. MATERIALS 301-2.1 All backfill and repair materials used in electrical demolition, repair and restoration work shall comply with the referenced specifications and be approved by the Engineer. Airport lighting equipment and materials shall meet the requirements outlined in Item SS-300 and Item L-125. CONSTRUCTION METHODS 301-3.1 General. No demolition shall be started until the removal and/or relocation work has been laid out and approved by the Engineer. All material shall be disposed of off-site. All hauling and disposal will be considered a necessary and incidental part of the work. Hauling cost shall be considered by the Contractor and included in the contract unit price for the pay of items of work involved. No payment will be made separately or directly for hauling on any part of the work. Equipment removal shall typically include removing the equipment and its accessories, removing foundations/pads, removing existing conduits, conductors and appurtenances, removal of conduit to below grade, and removal of existing circuits back to source. The work shall include restoring the area to match existing, including filling and tamping all holes with earth, and clearing and leveling the site. The Contractor shall remove all existing underground cable, which is unused or rendered unusable by this project, when such is exposed or made accessible during this work. All such wiring removed shall become property of the Contractor and shall be immediately removed from the project. Wiring in conduit shall be removed as indicated or if new wiring is shown to be installed in its place. Existing wiring shall not be reused or reinstalled. Wiring not exposed shall be abandoned in place, if a reasonable effort will not remove it. No measurement or payment will be made for this cable removal work. Damage to turf or other systems will not be permitted to salvage or retrieve existing cable. Any damage to electrical equipment, systems, structures, conduits, cables, and accessories or other utilities, designated to remain in place, shall be repaired or replaced expeditiously at no additional cost to the Owner and to the satisfaction of the Owner and Engineer. Holes, ditches, or other abrupt changes in elevation caused by the removal operations that could obstruct drainage or be considered hazardous or unsightly shall be backfilled, compacted, and left in a workmanlike condition. Trenches or voids resulting from the removal or demolition of existing electrical equipment or other structures shall be filled with approved material placed in layers in accordance with Item P-152. City Project No: 26122 Issue For Bids SS-301-1 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation Concrete foundations and pads to be removed shall be obliterated full depth. 301-3.2 Removal and/or relocation of light fixtures and equipment_ Light fixtures and other equipment which are to be removed shall be carefully excavated. All concrete bases and concrete anchors shall be removed by the Contractor. The removed lights, guidance signs, isolation transformers and wiring harnesses shall then be given to the Owner, or properly disposed of if so directed by the Owner. The ground around the removed lighting equipment shall be backfilled and properly compacted. Light fixtures and equipment which are to be relocated shall be stored on site and reinstalled with new lamps, new transformers, and all other new required accessories as indicated in the plans. 301-3.3 Removal of existing equipment. The Contractor shall carefully remove all salvageable equipment as indicated in the plans. Any equipment that is damaged during the removal and/or relocation operation shall be subject to a reduction in payment for removal and/or relocation of the equipment. All equipment that is removed during this project shall be transported to a site on the Airfield or removed from the Airfield and properly disposed of as directed by the Owner and the Engineer. 301-3.4 Clearing of existing duct banks or conduits. Where new cable is to be installed in an existing duct bank or conduit, the full length of the duct bank or conduit shall be cleared of debris by mechanical means before installation of the new cable. Acceptable means of clearing existing duct banks or conduits may include using a mandrel, "hydro-jetting" method, or"roto-rooting" method as approved by the Engineer. Where existing cables are being removed from an existing duct bank or conduit and replaced with new cables, the Contractor shall use the existing cable to clear the conduit and to pull in the new cable. No separate payment will be made for clearing these duct banks or conduits or for the existing cable removal. Clearing of these existing duct banks or conduits is incidental to the cable pay item unless otherwise noted. METHOD OF MEASUREMENT 301-4.1 The quantity of existing guidance signs, removed, to be measured under this item shall be the number of each complete unit removed, and accepted by the Engineer. This item shall include removing and storing the existing equipment as directed by the Engineer. Where the concrete structure is indicated to be removed or demolished, the item shall include restoring the area to match existing, including removing the complete concrete item, filling and tamping all holes with earth, and clearing and leveling the site. BASIS OF PAYMENT 301-5.1 Payment will be made at the contract unit price for each complete item, measured as provided above, and accepted by the Engineer. This price shall be full compensation for furnishing all materials and for all preparation, assembly, and installation of these materials, and for all labor, equipment, tools, and incidentals necessary to complete this item to the satisfaction of the Engineer. Payment will be made under: Item SS-301-5.1 Existing L-852L Taxiway Edge Light, Removed --per Each END OF ITEM SS-301 City Project No: 26122 Issue For Bids SS-301-2 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation ITEM SS-310 AIRPORT LIGHTING SYSTEMS DESCRIPTION 310-1.1 This item shall consist of furnishing and installing airport taxiway edge lighting systems, in accordance with this specification, the referenced specifications and drawings, and applicable advisory circulars. The system shall be installed at the locations and in accordance with the dimensions, design and details shown on the plans. This work shall include the furnishing of all equipment, materials, services and incidentals necessary to place it in operating condition as a completed unit to the satisfaction of the OAR. 310-1.2 The Contractor shall maintain current copies of all referenced and applicable standards on the job site. The Contractor is responsible to make known to the OAR any conflict between plans and specifications that he observes or of which he is made aware. EQUIPMENT AND MATERIALS 310-2.1 GENERAL. a. Airport lighting equipment and materials shall meet the requirements outlined in Item SS-300 and the applicable Item L Series Specifications. b. For pre-cast or prefabricated concrete encased light base installations, the Contractor shall submit and coordinate the construction of the proposed pre-cast units with the OAR onsite to review and approve the construction process. The Contractor shall submit his proposed installation process for review and approval by the OAR. The Contractor shall provide additional items and work if required and requested by the OAR for the construction and installation of the pre-cast units at no additional cost to the Owner. Pre-cast or prefabricated concrete encased light bases may only be assembled at the Contactor's staging area at the airport to allow the OAR to check and approve all such construction items. Pre-cast bases assembled offsite will not be allowed. 310-2.2 LIGHT FIXTURES. Airfield lights shall be supplied with all features and accessories including isolation transformers, light bases, base covers, safety ground rods, concrete pads and incidentals required for a complete installation as defined in these Specifications and as shown on the plans. 310-2.3 LAMPS. Lamps for elevated edge lights shall be LED type as specified. 310-2.4 SPARE EQUIPMENT INCLUDING FIXTURES. Provide 10 percent (rounded up to the next whole number) spare fixtures of each type installed for the taxiway edge lights, minimum quantity of 2 required. Spare fixtures shall not be measured for separate payment but shall be considered subsidiary to the respective light fixture pay item. a. A spare elevated LED fixture unit shall be one complete, ready-to-install fixture, including the coupling, column, head housing assembly, cordset, LED power supply assembly, LED assembly, and lens assembly. Spare fixtures shall be on-site and available for use by the Contractor prior to the final acceptance testing. Any fixtures installed new in this project and replaced as part of the final acceptance testing shall be shipped back to the manufacturer for repair or replacement, and then delivered back to the Owner at no additional cost. The spare fixtures shall be delivered and stored as directed by the Owner, with transmittal receipt signed by Owner's representative. A signed copy shall be forwarded to the OAR with an additional signed copy City Project No: 26122 Issue For Bids SS-301-1 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation placed in the O&M manuals. 310-2.5 ISOLATION TRANSFORMERS. New isolation transformers shall be Type L-830 and have a wattage rating suitable for the wattage of the fixture. The transformer shall be listed in FAA Circular AC 150/5345-47. Provide 10 percent spare isolation transformers of each type installed for lights. Spare transformers shall not be measured for separate payment but shall be considered subsidiary to the respective light fixture pay item. CONSTRUCTION METHODS 310-3.1 GENERAL. The installation and testing details for the lighting system shall be as specified in the applicable advisory circulars. The Contractor is responsible for all surveying and measurement which is required to accurately position and aim airfield lighting systems and equipment. Airfield lighting systems and equipment that are improperly installed shall be removed and re-installed correctly as directed by the OAR. No payment will be made for the removal and reinstallation of airfield lighting systems and equipment improperly installed. All remedial work shall be to the satisfaction of the OAR. 310-3.2 LIGHTING LAYOUT PLANS. The Contractor shall stake the airfield lighting systems, prior to installation of any trench, cable or lighting apparatus. The intent is to stake the installation at the locations indicated, noting any deviation from plan dimensions to the OAR prior to installation. The Contractor shall obtain the services of an experienced and licensed surveyor to perform this work. The OAR shall provide electronic CADD files to the Contractor for this staking work. The Contractor shall stake the items and his surveyor shall provide a CADD file submittal back to the OAR. Based upon this submittal, the OAR shall coordinate and provide directions on any adjustments necessary to meet existing field condition requirements and comply with FAA Advisory Circular requirements on the layout and spacing of equipment. The Contractor and his surveyor shall then make any electronic CADD file spacing adjustments and/or field staking adjustments prior to installation at no additional cost to the Owner. Refer to General Provisions Section 50 Control of Work for additional construction layout and staking requirements. 310-3.3 PLACING THE EQUIPMENT. The equipment shall be mounted on concrete pads as shown in the plans. Secure the equipment and make all final connections. 310-3.4 MOUNTING, LEVELING, AND AIMING. The concrete support to which the equipment is fastened shall be accurately leveled before mounting the equipment. The units shall be properly aimed, as recommended by the manufacturer of the supplied equipment. This adjustment shall be accomplished using factory-approved aiming devices and techniques. 310-3.5 PLACING LIGHTS. All equipment shall be installed at locations indicated in the plans. Lights shall be laid out by locating the two control points by station as indicated on the plans and measuring the indicated individual separation distances. Light bases shall be located within 1 inch +/- longitudinally and 0.5 inches +/- transversely of the location indicated unless deviation is approved by the OAR. Excavation for installation of light bases shall be backfilled with at least 4 inches of granular leveling course, as City Project No: 26122 Issue For Bids SS-301-2 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation approved by the OAR. Fixture height shall be as indicated on the Drawings. For pre-cast or prefabricated concrete encased light base installations, a leveling course of sand shall be placed in the bottom of the excavated hole, sufficient for accurately installing, leveling and placing the lights in accordance with the requirements in this specification and AC 150/5340-30. Concrete encased light bases shall be allowed to cure a minimum of 7 days prior to installation. Utilize a bubble level device to level all light fixtures in the horizontal light plane during the day, and then check at night to ensure uniformity in light output. Provide factory-approved alignment tools and aiming devices to properly level and align fixtures as required by the FAA Advisory Circulars and manufacturer's installation instructions. After all light fixture installations are completed and accepted by the OAR, these alignment tools and aiming devices shall become property of the Owner and shall be delivered and stored as directed by the Owner. 310-3.6 TRANSFORMER INSTALLATION. The transformer for base mounted fixtures shall be placed inside the base. The transformer for stake mounted fixtures shall be located uniformly as shown on the plans. The primary cable connections shall be made with L-823 connectors as described in Item L-108 and have 3 feet of slack cable. The secondary leads connected to the lamp leads by means of a disconnecting plug and receptacle provided with the unit, and this joint shall not be taped. The secondary joint shall be fastened with a holding ring provided for this purpose. 310-3.7 UNIT ASSEMBLY. All electrical equipment, including edge lights shall be assembled in accordance with the manufacturer's installation procedures. Anti-seize compound shall be used on all screws, nuts, and threads, including frangible coupling threads. If coated bolts are used (ceramic metallic/fluoropolymer coating), then do not apply anti-seize compound. Provide and install all spacers, shims, and gaskets as required, and verify they are in place before installing the light fixture on the base. Bolts and washers for new and existing bases shall be new. Do not reuse existing hardware. The minimum thread engagement into top flange of the base shall be 0.5 inches. Coordinate recommended torque values with the light fixture manufacturer, light base can manufacturer, stainless steel bolts and hardware used, and exact anti-seize compound used, to prevent light base thread damage. Utilize a dial-type torque wrench for accuracy and to prevent over-tightening bolts. Never use impact wrenches/drills when removing or installing bolts. The Contractor shall obtain complete installation manuals for the new airfield lighting equipment prior to any removal or installation work. Copies of these manuals shall be maintained in 3-ring binders within the Contractor's onsite field office. 310-3.8 IDENTIFICATION NUMBERS. An identifying number shall be assigned to each light and sign in accordance with the plans or as approved by the OAR and Owner. This number shall be imprinted with reflective black with 1/2" letters on a non-corrosive metal disc 2" minimum diameter and attached to the pavement side of the fixture with a metal screw. 310-3.9 TEMPORARY AIRFIELD LIGHTING. Refer to the Airfield Lighting Phasing Plans and Details for additional requirements. Existing lighting circuits shall remain operational by use of temporary circuits. New lighting circuits shall also be connected and remain operational by use of temporary circuits. This item shall include all work to maintain the existing and new lighting circuits during construction and allow all taxiways City Project No: 26122 Issue For Bids SS-301-3 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation and runways in operation to remain lighted, including that portion through the construction area, as indicated in the Phasing Plans and as directed by the OAR. The Contractor shall perform initial field work including location and verification of existing circuits and submit plans for the temporary airfield lighting required in each work phase, for review and approval by the OAR and Owner, prior to starting work of that phase. This work shall include megger testing of circuits and circuit segments before and after installation and connection of jumpers. The Contractor shall install couplings and other required fittings/appurtenances in conduit systems at last pavement joint within each phase for connecting to conduit systems in the next phase, or for connecting to existing conduit systems to remain. 310-3.10 TESTING. The installation shall be tested in operation as a completed unit prior to acceptance. Tests shall include taking megger and voltage readings as outlined in Item SS-300 and Item L-108. Testing equipment shall be furnished by the Contractor. Refer to Item L-108 for additional test requirements. Tests shall be conducted in the presence of the OAR and shall be to his/her satisfaction. All installations shall be fully tested by continuous operation for not less than 24 hours as completed systems prior to acceptance. These tests shall include the functioning of each control not less than 10 times. Equipment and materials covered by FAA Advisory Circulars are referred to by item numbers and approved equipment is listed within the AC 150/5345-53 Airport Lighting Equipment Certification Program's monthly Addendum, which contains a complete and updated listing of the certified equipment and manufacturers, and is listed in the FAA Buy American Preference equipment list, which is also updated monthly. The Contractor shall provide and install new certified equipment that works reliably and efficiently with the existing equipment to remain in service. The Contractor shall provide any additional accessories and/or appurtenances required to provide fully functional electrical systems to the satisfaction of the Owner and OAR, at no additional cost to the Owner. The Contractor shall ascertain that all lighting system components furnished (including FAA certified and approved equipment) are compatible in all respects with each other and the remainder of the new and existing systems. Any non-compatible components furnished by the Contractor shall be replaced at no additional cost to the Owner with a similar unit that is approved by the OAR and compatible with the remainder of the airport lighting system. METHOD OF MEASUREMENT 310-4.1 Temporary airfield lighting shall be measured as a lump sum complete item, including all work completed in place and ready for operation, and including the installation, protection, and removal of all temporary cables, conduits, lighting, grounding, marking, and associated items and appurtenances, as indicated in the Drawings and as directed by the OAR. BASIS OF PAYMENT 310-5.1 Payment will be made at the contract lump sum price for each complete item, measured as provided above, and accepted by the OAR. This price shall be full compensation for furnishing all materials and for all preparation, assembly, and installation of these materials, and for all labor, equipment, tools, and incidentals necessary to complete this item to the satisfaction of the OAR. Payment will be made under: City Project No: 26122 Issue For Bids SS-301-4 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation Item SS-310-5.1 Temporary Airfield Lighting —per Lump Sum END OF ITEM SS-310 City Project No: 26122 Issue For Bids SS-301-5 Garver Project No. 2502477 Corpus Christi International Airport Taxiway Echo Rehabilitation PAGE INTENTIONALLY LEFT BLANK City Project No: 26122 Issue For Bids SS-301-6 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 ITEM C-100 CONTRACTOR QUALITY CONTROL PROGRAM (CQCP) 100-1 General. Quality is more than test results. Quality is the combination of proper materials, testing, workmanship, equipment, inspection, and documentation of the project. Establishing and maintaining a culture of quality is key to achieving a quality project. The Contractor shall establish, provide, and maintain an effective Contractor Quality Control Program (CQCP) that details the methods and procedures that will be taken to assure that all materials and completed construction required by this contract conform to contract plans, technical specifications and other requirements, whether manufactured by the Contractor, or procured from subcontractors or vendors. Although guidelines are established and certain minimum requirements are specified here and elsewhere in the contract technical specifications, the Contractor shall assume full responsibility for accomplishing the stated purpose. The Contractor shall establish a CQCP that will: a. Provide qualified personnel to develop and implement the CQCP. b. Provide for the production of acceptable quality materials. c. Provide sufficient information to assure that the specification requirements can be met. d. Document the CQCP process. The Contractor shall not begin any construction or production of materials to be incorporated into the completed work until the CQCP has been reviewed and approved by the Engineer. Resident Project Representative(RPR). No partial payment will be made for materials subject to specific quality control (QC) requirements until the CQCP has been reviewed and approved. The QC requirements contained in this section and elsewhere in the contract technical specifications are in addition to and separate from the quality assurance (QA)testing requirements. QA testing requirements are the responsibility of the RPR or Contractor as specified in the specifications. A Quality Control (QC)/Quality Assurance (QA) workshop with the Engineer, Resident Project Representative (RPR), Contractor, subcontractors, testing laboratories, and Owner's representative must be held prior to start of construction, and may be held in conjunction with the preconstruction meeting. The QC/QA workshop will be facilitated by the Engineer. SeRtras#er. The Contractor shall coordinate with the Airport and the Engineer Rr DR on time and location of the QC/QA workshop. Items to be addressed, at a minimum, will include: a. Review of the CQCP including submittals, QC Testing, Action & Suspension Limits for Production, Corrective Action Plans, Distribution of QC reports, and Control Charts. b. Discussion of the QA program. c. Discussion of the QC and QA Organization and authority including coordination and information exchange between QC and QA. d. Establish regular meetings to discuss control of materials, methods and testing. e. Establishment of the overall QC culture. 100-2 Description of program. a. General description. The Contractor shall establish a CQCP to perform QC inspection and testing of all items of work required by the technical specifications, including those performed by subcontractors. The CQCP shall ensure conformance to applicable specifications and plans with respect to materials, off- site fabrication,workmanship,construction,finish,and functional performance.The CQCP shall be effective for control of all construction work performed under this Contract and shall specifically include surveillance and tests required by the technical specifications, in addition to other requirements of this section and any other activities deemed necessary by the Contractor to establish an effective level of QC. City Project No: 26122 Issue For Bids C-100-1 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 b. Contractor Quality Control Program(CQCP). The Contractor shall describe the CQCP in a written document that shall be reviewed and approved by the Engineer PCB prior to the start of any production, construction,or off-site fabrication.The written CQCP shall be submitted to the RPR for review and approval at least 10 calendar days before the CQCP Workshop. The Contractor's CQCP and QC testing laboratory must be approved in writing by the Engineer RRR prior to the start of work items included in the CQCP (earthwork, base, stabilized base, paving, etc.). Notice to o,-,,,eed (NTP) The CQCP shall be organized to address, as a minimum, the following: 1. QC organization and resumes of key staff 2. Project progress schedule 3. Submittals schedule 4. Inspection requirements 5. QC testing plan 6. Documentation of QC activities and distribution of QC reports 7. Requirements for corrective action when QC and/or QA acceptance criteria are not met 8. Material quality and construction means and methods. Address all elements applicable to the project that affect the quality of the pavement structure including subgrade, subbase, base,and surface course. Some elements that must be addressed include, but is not limited to mix design, aggregate grading, stockpile management, mixing and transporting, placing and finishing, quality control testing and inspection, smoothness, laydown plan, equipment, and temperature management plan. The Contractor must add any additional elements to the CQCP that is necessary to adequately control all production and/or construction processes required by this contract. 100-3 CQCP organization. The CQCP shall be implemented by the establishment of a QC organization. An organizational chart shall be developed to show all QC personnel, their authority, and how these personnel integrate with other management/production and construction functions and personnel. The organizational chart shall identify all QC staff by name and function, and shall indicate the total staff required to implement all elements of the CQCP, including inspection and testing for each item of work. If necessary, different technicians can be used for specific inspection and testing functions for different items of work. If an outside organization or independent testing laboratory is used for implementation of all or part of the CQCP, the personnel assigned shall be subject to the qualification requirements of paragraphs 100-03a and 100-03b. The organizational chart shall indicate which personnel are Contractor employees and which are provided by an outside organization. The QC organization shall, as a minimum, consist of the following personnel: a. Program Administrator. The Contractor Quality Control Program Administrator (CQCPA) must be a full-time employee of the Contractor, or a consultant engaged by the Contractor. The CQCPA must have a minimum of five (5) years of experience in QC pavement construction with prior QC experience on a project of comparable size and scope as the contract. Included in the five (5) years of paving/QC experience, the CQCPA must meet at least one of the following requirements: (1) Professional Engineer with one (1)year of airport paving experience. (2) Engineer-in-training with two (2)years of airport paving experience. (3) National Institute for Certification in Engineering Technologies (NICET) Civil Engineering Technology Level IV with three (3) years of airport paving experience. City Project No: 26122 Issue For Bids C-100-2 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 (4)An individual with four(4)years of airport paving experience, with a Bachelor of Science Degree in Civil Engineering, Civil Engineering Technology or Construction. Certification at an equivalent level of qualification and experience by a state or nationally recognized organization will be acceptable in lieu of NICET certification. The CQCPA must have full authority to institute any and all actions necessary for the successful implementation of the CQCP to ensure compliance with the contract plans and technical specifications.The CQCPA authority must include the ability to immediately stop production until materials and/or processes are in compliance with contract specifications. The CQCPA must report directly to a principal officer of the construction firm. The CQCPA may supervise the Quality Control Program on more than one project provided that person can be at the job site within two (2) hours after being notified of a problem. b. QC technicians. A sufficient number of QC technicians necessary to adequately implement the CQCP must be provided. These personnel must be either Engineers, engineering technicians, or experienced craftsman with qualifications in the appropriate field equivalent to NICET Level II in Civil Engineering Technology or higher, and shall have a minimum of two (2) years of experience in their area of expertise. The QC technicians must report directly to the CQCPA and shall perform the following functions: (1) Inspection of all materials, construction, plant, and equipment for conformance to the technical specifications, and as required by paragraph 100-6. (2) Performance of all QC tests as required by the technical specifications and paragraphl00-8. (3) Performance of tests for the Engineer and RPR when required by the technical specifications. Certification at an equivalent level of qualification and experience by a state or nationally recognized organization will be acceptable in lieu of NICET certification. c. Staffing levels. The Contractor shall provide sufficient qualified QC personnel to monitor each work activity at all times. Where material is being produced in a plant for incorporation into the work, separate plant and field technicians shall be provided at each plant and field placement location. The scheduling and coordinating of all inspection and testing must match the type and pace of work activity. The CQCP shall state where different technicians will be required for different work elements. 100-4 Project progress schedule. Critical QC activities must be shown on the project schedule as required by Section 80, paragraph 80-03, Execution and Progress. 100-5 Submittals schedule. The Contractor shall submit a detailed listing of all submittals (for example, mix designs, material certifications) and shop drawings required by the technical specifications. The listing can be developed in a spreadsheet format and shall include as a minimum: a. Specification item number b. Item description c. Description of submittal d. Specification paragraph requiring submittal e. Scheduled date of submittal 100-6 Inspection requirements. QC inspection functions shall be organized to provide inspections for all definable features of work, as detailed below. All inspections shall be documented by the Contractor as specified by paragraph 100-9. Inspections shall be performed as needed to ensure continuing compliance with contract requirements until completion of the particular feature of work. Inspections shall include the following minimum requirements: a. During plant operation for material production, QC test results and periodic inspections shall be used to ensure the quality of aggregates and other mix components, and to adjust and control mix proportioning City Project No: 26122 Issue For Bids C-100-3 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 to meet the approved mix design and other requirements of the technical specifications.All equipment used in proportioning and mixing shall be inspected to ensure its proper operating condition. The CQCP shall detail how these and other QC functions will be accomplished and used. b. During field operations, QC test results and periodic inspections shall be used to ensure the quality of all materials and workmanship. All equipment used in placing, finishing, and compacting shall be inspected to ensure its proper operating condition and to ensure that all such operations are in conformance to the technical specifications and are within the plan dimensions, lines, grades, and tolerances specified. The CQCP shall document how these and other QC functions will be accomplished and used. 100-7 Contractor QC testing facility. a. For projects that include Item P-401, Item P-403, and Item P-404, the Contractor shall ensure facilities, including all necessary equipment, materials, and current reference standards, are provided that meet requirements in the following paragraphs of ASTM D3666, Standard Specification for Minimum Requirements for Agencies Testing and Inspecting Road and Paving Materials: • 8.1.3 Equipment Calibration and Checks; • 8.1.9 Equipment Calibration, Standardization, and Check Records; • 8.1.12 Test Methods and Procedures b. For projects that include P-501, the Contractor shall ensure facilities, including all necessary equipment, materials,and current reference standards,are provided that meet requirements in the following paragraphs of ASTM C1077, Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation: • 7 Test Methods and Procedures • 8 Facilities, Equipment, and Supplemental Procedures 100-8 QC testing plan. As a part of the overall CQCP, the Contractor shall implement a QC testing plan, as required by the technical specifications. The testing plan shall include the minimum tests and test frequencies required by each technical specification Item, as well as any additional QC tests that the Contractor deems necessary to adequately control production and/or construction processes. The QC testing plan can be developed in a spreadsheet fashion and shall, as a minimum, include the following: a. Specification item number(e.g., P-401) b. Item description (e.g., Hot Mix Asphalt Pavements) c. Test type (e.g., gradation, grade, asphalt content) d. Test standard (e.g., ASTM or American Association of State Highway and Transportation Officials (AASHTO)test number, as applicable) e. Test frequency (e.g., as required by technical specifications or minimum frequency when requirements are not stated) f. Responsibility (e.g., plant technician) g. Control requirements (e.g., target, permissible deviations) The QC testing plan shall contain a statistically-based procedure of random sampling for acquiring test samples in accordance with ASTM D3665. The Engineer and RPR shall be provided the opportunity to witness QC sampling and testing. All QC test results shall be documented by the Contractor as required by paragraph 100-9. City Project No: 26122 Issue For Bids C-100-4 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 100-9 Documentation. The Contractor shall maintain current QC records of all inspections and tests performed. These records shall include factual evidence that the required QC inspections or tests have been performed, including type and number of inspections or tests involved; results of inspections or tests; nature of defects, deviations, causes for rejection, etc.; proposed remedial action; and corrective actions taken. These records must cover both conforming and defective or deficient features, and must include a statement that all supplies and materials incorporated in the work are in full compliance with the terms of the contract. Legible copies of these records shall be furnished to the Engineer and RPR daily. The records shall cover all work placed subsequent to the previously furnished records and shall be verified and signed by the CQCPA. Contractor QC records required for the contract shall include, but are not necessarily limited to,the following records: a. Daily inspection reports. Each Contractor QC technician shall maintain a daily log of all inspections performed for both Contractor and subcontractor operations. These technician's daily reports shall provide factual evidence that continuous QC inspections have been performed and shall, as a minimum, include the following: (1) Technical specification item number and description (2) Compliance with approved submittals (3) Proper storage of materials and equipment (4) Proper operation of all equipment (5)Adherence to plans and technical specifications (6) Summary of any necessary corrective actions (7) Safety inspection. (8) Photographs and/or video The daily inspection reports shall identify all QC inspections and QC tests conducted, results of inspections, location and nature of defects found, causes for rejection, and remedial or corrective actions taken or proposed. The daily inspection reports shall be signed by the responsible QC technician and the CQCPA. The Engineer and RPR shall be provided at least one copy of each daily inspection report on the work day following the day of record. When QC inspection and test results are recorded and transmitted electronically, the results must be archived. b. Daily test reports. The Contractor shall be responsible for establishing a system that will record all QC test results. Daily test reports shall document the following information: (1) Technical specification item number and description (2) Test designation (3) Location (4) Date of test (5) Control requirements (6) Test results (7) Causes for rejection (8) Recommended remedial actions (9) Retests Test results from each day's work period shall be submitted to the Engineer and RPR prior to the start of the next day's work period. When required by the technical specifications, the Contractor shall maintain statistical QC charts. When QC daily test results are recorded and transmitted electronically, the results must be archived. City Project No: 26122 Issue For Bids C-100-5 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 100-10 Corrective action requirements. The CQCP shall indicate the appropriate action to be taken when a process is deemed, or believed, to be out of control (out of tolerance)and detail what action will be taken to bring the process into control. The requirements for corrective action shall include both general requirements for operation of the CQCP as a whole, and for individual items of work contained in the technical specifications. The CQCP shall detail how the results of QC inspections and tests will be used for determining the need for corrective action and shall contain clear rules to gauge when a process is out of control and the type of correction to be taken to regain process control. When applicable or required by the technical specifications,the Contractor shall establish and use statistical QC charts for individual QC tests.The requirements for corrective action shall be linked to the control charts. 100-11 Inspection and/or observations by the Engineer and RPR. All items of material and equipment are subject to inspection and/or observation by the Engineer and RPR at the point of production, manufacture or shipment to determine if the Contractor, producer, manufacturer or shipper maintains an adequate QC system in conformance with the requirements detailed here and the applicable technical specifications and plans. In addition, all items of materials, equipment and work in place shall be subject to inspection and/or observation by the Engineer and RPR at the site for the same purpose. Inspection and/or observations by the Engineer and RPR does not relieve the Contractor of performing QC inspections of either on-site or off-site Contractor's or subcontractor's work. 100-12 Noncompliance. a. The Engineer Resident PF ect RepF sentatiye (RPR)will provide written notice to the Contractor of any noncompliance with their CQCP.After receipt of such notice,the Contractor must take corrective action. b. When QC activities do not comply with either the CQCP or the contract provisions or when the Contractor fails to properly operate and maintain an effective CQCP, and no effective corrective actions have been taken after notification of non-compliance, the Engineer RPR will recommend the Owner take the following actions: (1)Order the Contractor to replace ineffective or unqualified QC personnel or subcontractors and/or (2) Order the Contractor to stop operations until appropriate corrective actions are taken. METHOD OF MEASUREMENT 100-13 Basis of measurement and payment. Contractor Quality Control Program (CQCP) is for the personnel, tests, facilities and documentation required to implement the CQCP. The CQCP will be paid as a lump sum with the following schedule of partial payments: a. With first pay request, 25%with approval of CQCP and completion of the Quality Control (QC)/Quality Assurance (QA)workshop. b. When 25% or more of the original contract is earned, an additional 25%. c. When 50% or more of the original contract is earned, an additional 20%. d. When 75% or more of the original contract is earned, an additional 20% e. After final inspection and acceptance of project, the final 10%. BASIS OF PAYMENT 100-14 Payment will be made under: Item C-100-14.1 Contractor Quality Control Program (CQCP)—Lump Sum REFERENCES City Project No: 26122 Issue For Bids C-100-6 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. National Institute for Certification in Engineering Technologies (NICET) ASTM International (ASTM) ASTM C1077 Standard Practice for Agencies Testing Concrete and Concrete Aggregates for Use in Construction and Criteria for Testing Agency Evaluation ASTM D3665 Standard Practice for Random Sampling of Construction Materials ASTM D3666 Standard Specification for Minimum Requirements for Agencies Testing and Inspecting Road and Paving Materials END OF ITEM C-100 City Project No: 26122 Issue For Bids C-100-7 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY LEFT BLANK City Project No: 26122 Issue For Bids C-100-8 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 ITEM C-110 METHOD OF ESTIMATING PERCENTAGE OF MATERIAL WITHIN SPECIFICATION LIMITS (PWL) 110-1 General. When the specifications provide for acceptance of material based on the method of estimating percentage of material within specification limits (PWL), the PWL will be determined in accordance with this section. All test results for a lot will be analyzed statistically to determine the total estimated percent of the lot that is within specification limits. The PWL is computed using the sample average (X) and sample standard deviation (Sn) of the specified number (n) of sublots for the lot and the specification tolerance limits, L for lower and U for upper, for the particular acceptance parameter. From these values, the respective Quality index, QL for Lower Quality Index and/or Qu for Upper Quality Index, is computed and the PWL for the lot for the specified n is determined from Table 1. All specification limits specified in the technical sections shall be absolute values. Test results used in the calculations shall be to the significant figure given in the test procedure. There is some degree of uncertainty(risk)in the measurement for acceptance because only a small fraction of production material (the population) is sampled and tested. This uncertainty exists because all portions of the production material have the same probability to be randomly sampled. The Contractor's risk is the probability that material produced at the acceptable quality level is rejected or subjected to a pay adjustment. The Owner's risk is the probability that material produced at the rejectable quality level is accepted. It is the intent of this section to inform the Contractor that, in order to consistently offset the Contractor's risk for material evaluated, production quality(using population average and population standard deviation) must be maintained at the acceptable quality specified or higher. In all cases, it is the responsibility of the Contractor to produce at quality levels that will meet the specified acceptance criteria when sampled and tested at the frequencies specified. 110-2 Method for computing PWL. The computational sequence for computing PWL is as follows: a. Divide the lot into n sublots in accordance with the acceptance requirements of the specification. b. Locate the random sampling position within the sublot in accordance with the requirements of the specification. c. Make a measurement at each location, or take a test portion and make the measurement on the test portion in accordance with the testing requirements of the specification. d. Find the sample average (X)for all sublot test values within the lot by using the following formula: X= (X1 +X2 +X3+ . . An)/ n Where: X = Sample average of all sublot test values within a lot x1, x2,. . .xn= Individual sublot test values n = Number of sublot test values e. Find the sample standard deviation (Sn) by use of the following formula: Sn = [(d12 + d22 + d32 + . . Ant)/(n-1)]v2 Where: Sn = Sample standard deviation of the number of sublot test values in the set d1, d2, . . .dn = Deviations of the individual sublot test values x1, x2, ... from the average value X that is: d1 = (x1 -X), d2 = (X2-X) ... do = (Xn -X) n = Number of sublot test values City Project No: 26122 Issue For Bids C-110-1 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 f. For single sided specification limits (i.e., L only), compute the Lower Quality Index QL by use of the following formula: QL= (X- L)/S„ Where: L = specification lower tolerance limit Estimate the percentage of material within limits (PWL) by entering Table 1 with QL, using the column appropriate to the total number(n) of measurements. If the value of QL falls between values shown on the table, use the next higher value of PWL. g. For double-sided specification limits (i.e., L and U), compute the Quality Indexes QL and Qu by use of the following formulas: QL= (X- L)/S„ and QU = (U -X)/S„ Where: L and U = specification lower and upper tolerance limits Estimate the percentage of material between the lower (L) and upper (U) tolerance limits (PWL) by entering Table 1 separately with QL and Qu, using the column appropriate to the total number (n) of measurements, and determining the percent of material above PL and percent of material below Pu for each tolerance limit. If the values of QL fall between values shown on the table, use the next higher value of PL or Pu. Determine the PWL by use of the following formula: PWL= (Pu + PL) - 100 Where: PL= percent within lower specification limit Pu = percent within upper specification limit City Project No: 26122 Issue For Bids C-110-2 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 EXAMPLE OF PWL CALCULATION Project: Example Project Test Item: Item P-401, Lot A. A. PWL Determination for Mat Density. 1. Density of four random cores taken from Lot A. A-1 = 96.60 A-2 = 97.55 A-3 = 99.30 A-4 = 98.35 n =4 2. Calculate average density for the lot. X= (X1 +X2 + X3 + . . An)/ n X= (96.60 + 97.55 + 99.30 + 98.35)/4 X= 97.95% density 3. Calculate the standard deviation for the lot. Sn = [((96.60 -97.95)2 + (97.55- 97.95)2 +(99.30-97.95)2 + (98.35-97.95)2))/ (4- 1)]1i2 Sn = [(1.82 + 0.16 + 1.82 + 0.16)/ 3]1/2 Sn = 1.15 4. Calculate the Lower Quality Index QL for the lot. (L=96.3) QL_ (X-L)/Sn QL_ (97.95- 96.30)/ 1.15 QL= 1.4348 S. Determine PWL by entering Table 1 with QL= 1.44 and n=4. PWL = 98 B. PWL Determination for Air Voids. 1. Air Voids of four random samples taken from Lot A. A-1 = 5.00 A-2 = 3.74 A-3 = 2.30 A-4 = 3.25 2. Calculate the average air voids for the lot. X= (X1 +x2 +X3 . . .n)/ n X= (5.00 + 3.74 + 2.30 + 3.25) /4 X= 3.57% 3. Calculate the standard deviation Sn for the lot. Sn = [((3.57- 5.00)2 + (3.57 - 3.74)2 + (3.57- 2.30)2 + (3.57 -3.25)2)/(4- 1)]1/2 Sn = [(2.04 + 0.03 + 1.62 + 0.10)/ 3]1/2 City Project No: 26122 Issue For Bids C-110-3 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Sn = 1.12 4. Calculate the Lower Quality Index QL for the lot. (L= 2.0) QL_ (X- L)/Sn QL= (3.57-2.00)/ 1.12 QL= 1.3992 5. Determine PL by entering Table 1 with QL = 1.41 and n = 4. PL= 97 6. Calculate the Upper Quality Index Qu for the lot. (U= 5.0) QU = (U -X)/Sn Qu = (5.00 -3.57)/ 1.12 Qu = 1.2702 7. Determine Pu by entering Table 1 with Qu = 1.29 and n = 4. Pu = 93 8. Calculate Air Voids PWL PWL = (PL + Pu) - 100 PWL = (97 + 93)- 100 = 90 EXAMPLE OF OUTLIER CALCULATION (REFERENCE ASTM E178) Project: Example Project Test Item: Item P-401, Lot A. A. Outlier Determination for Mat Density. 1. Density of four random cores taken from Lot A arranged in descending order. A-3 = 99.30 A-4 = 98.35 A-2 = 97.55 A-1 = 96.60 2. From ASTM E178,Table 1,for n=4 an upper 5%significance level,the critical value for test criterion = 1.463. 3. Use average density, standard deviation, and test criterion value to evaluate density measurements. a. For measurements greater than the average: If (measurement - average)/(standard deviation) is less than test criterion, then the measurement is not considered an outlier. For A-3, check if(99.30 - 97.95)/ 1.15 is greater than 1.463. Since 1.174 is less than 1.463, the value is not an outlier. b. For measurements less than the average: If (average - measurement)/(standard deviation) is less than test criterion, then the measurement is not considered an outlier. For A-1, check if(97.95- 96.60)/ 1.15 is greater than 1.463. Since 1.435 is less than 1.463, the value is not an outlier. City Project No: 26122 Issue For Bids C-110-4 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Note: In this example, a measurement would be considered an outlier if the density were: Greater than (97.95 + 1.463 x 1.15) = 99.63% OR less than (97.95 - 1.463 x 1.15) = 96.27%. Table 1. Table for Estimating Percent of Lot Within Limits (PWL) Percent Within Positive Values of Q(QL and Qu) Limits (PLand Pu) n=3 n=4 n=5 n=6 n=7 n=8 n=9 n=10 99 1.1541 1.4700 1.6714 1.8008 1.8888 1.9520 1.9994 2.0362 98 1.1524 1.4400 1.6016 1.6982 1.7612 1.8053 1.8379 1.8630 97 1.1496 1.4100 1.5427 1.6181 1.6661 1.6993 1.7235 1.7420 96 1.1456 1.3800 1.4897 1.5497 1.5871 1.6127 1.6313 1.6454 95 1.1405 1.3500 1.4407 1.4887 1.5181 1.5381 1.5525 1.5635 94 1.1342 1.3200 1.3946 1.4329 1.4561 1.4717 1.4829 1.4914 93 1.1269 1.2900 1.3508 1.3810 1.3991 1.4112 1.4199 1.4265 92 1.1184 1.2600 1.3088 1.3323 1.3461 1.3554 1.3620 1.3670 91 1.1089 1.2300 1.2683 1.2860 1.2964 1.3032 1.3081 1.3118 90 1.0982 1.2000 1.2290 1.2419 1.2492 1.2541 1.2576 1.2602 89 1.0864 1.1700 1.1909 1.1995 1.2043 1.2075 1.2098 1.2115 88 1.0736 1.1400 1.1537 1.1587 1.1613 1.1630 1.1643 1.1653 87 1.0597 1.1100 1.1173 1.1192 1.1199 1.1204 1.1208 1.1212 86 1.0448 1.0800 1.0817 1.0808 1.0800 1.0794 1.0791 1.0789 85 1.0288 1.0500 1.0467 1.0435 1.0413 1.0399 1.0389 1.0382 84 1.0119 1.0200 1.0124 1.0071 1.0037 1.0015 1.0000 0.9990 83 0.9939 0.9900 0.9785 0.9715 0.9671 0.9643 0.9624 0.9610 82 0.9749 0.9600 0.9452 0.9367 0.9315 0.9281 0.9258 0.9241 81 0.9550 0.9300 0.9123 0.9025 0.8966 0.8928 0.8901 0.8882 80 0.9342 0.9000 0.8799 0.8690 0.8625 0.8583 0.8554 0.8533 79 0.9124 0.8700 0.8478 0.8360 0.8291 0.8245 0.8214 0.8192 78 0.8897 0.8400 0.8160 0.8036 0.7962 0.7915 0.7882 0.7858 77 0.8662 0.8100 0.7846 0.7716 0.7640 0.7590 0.7556 0.7531 76 0.8417 0.7800 0.7535 0.7401 0.7322 0.7271 0.7236 0.7211 75 0.8165 0.7500 0.7226 0.7089 0.7009 0.6958 0.6922 0.6896 74 0.7904 0.7200 0.6921 0.6781 0.6701 0.6649 0.6613 0.6587 73 0.7636 0.6900 0.6617 0.6477 0.6396 0.6344 0.6308 0.6282 72 0.7360 0.6600 0.6316 0.6176 0.6095 0.6044 0.6008 0.5982 71 0.7077 0.6300 0.6016 0.5878 0.5798 0.5747 0.5712 0.5686 70 0.6787 0.6000 0.5719 0.5582 0.5504 0.5454 0.5419 0.5394 69 0.6490 0.5700 0.5423 0.5290 0.5213 0.5164 0.5130 0.5105 68 0.6187 0.5400 0.5129 0.4999 0.4924 0.4877 0.4844 0.4820 67 0.5878 0.5100 0.4836 0.4710 0.4638 0.4592 0.4560 0.4537 66 0.5563 0.4800 0.4545 0.4424 0.4355 0.4310 0.4280 0.4257 65 0.5242 0.4500 0.4255 0.4139 0.4073 0.4030 0.4001 0.3980 64 0.4916 0.4200 0.3967 0.3856 0.3793 0.3753 0.3725 0.3705 63 0.4586 0.3900 0.3679 0.3575 0.3515 0.3477 0.3451 0.3432 62 0.4251 0.3600 0.3392 0.3295 0.3239 0.3203 0.3179 0.3161 61 0.3911 0.3300 0.3107 0.3016 0.2964 0.2931 0.2908 0.2892 60 0.3568 0.3000 0.2822 0.2738 0.2691 0.2660 0.2639 0.2624 59 0.3222 0.2700 0.2537 0.2461 0.2418 0.2391 0.2372 0.2358 58 0.2872 0.2400 0.2254 0.2186 0.2147 0.2122 0.2105 0.2093 57 0.2519 0.2100 0.1971 0.1911 0.1877 0.1855 0.1840 0.1829 56 0.2164 0.1800 0.1688 0.1636 0.1607 0.1588 0.1575 0.1566 55 0.1806 0.1500 0.1406 0.1363 0.1338 0.1322 0.1312 0.1304 54 0.1447 0.1200 0.1125 0.1090 0.1070 0.1057 0.1049 0.1042 53 0.1087 0.0900 0.0843 0.0817 0.0802 0.0793 1 0.0786 0.0781 52 0.0725 0.0600 0.0562 0.0544 0.0534 0.0528 0.0524 0.0521 51 0.0363 0.0300 0.0281 0.0272 0.0267 0.0264 0.0262 0.0260 50 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 0.0000 City Project No: 26122 Issue For Bids C-110-5 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Percent Negative Values of Q (QL and Qu) Within Limits n=3 n=4 n=5 n=6 n=7 n=8 n=9 n=10 (PL and Pu) 49 -0.0363 -0.0300 -0.0281 -0.0272 -0.0267 -0.0264 -0.0262 -0.0260 48 -0.0725 -0.0600 -0.0562 -0.0544 -0.0534 -0.0528 -0.0524 -0.0521 47 -0.1087 -0.0900 -0.0843 -0.0817 -0.0802 -0.0793 -0.0786 -0.0781 46 -0.1447 -0.1200 -0.1125 -0.1090 1 -0.1070 -0.1057 -0.1049 -0.1042 45 -0.1806 -0.1500 -0.1406 -0.1363 -0.1338 -0.1322 -0.1312 -0.1304 44 -0.2164 -0.1800 -0.1688 -0.1636 -0.1607 -0.1588 -0.1575 -0.1566 43 -0.2519 -0.2100 -0.1971 -0.1911 -0.1877 -0.1855 -0.1840 -0.1829 42 -0.2872 -0.2400 -0.2254 -0.2186 -0.2147 -0.2122 -0.2105 -0.2093 41 -0.3222 -0.2700 -0.2537 -0.2461 -0.2418 -0.2391 -0.2372 -0.2358 40 -0.3568 -0.3000 -0.2822 -0.2738 -0.2691 -0.2660 -0.2639 -0.2624 39 -0.3911 -0.3300 -0.3107 -0.3016 -0.2964 -0.2931 -0.2908 -0.2892 38 -0.4251 -0.3600 -0.3392 -0.3295 -0.3239 -0.3203 -0.3179 -0.3161 37 -0.4586 -0.3900 -0.3679 -0.3575 -0.3515 -0.3477 -0.3451 -0.3432 36 -0.4916 -0.4200 -0.3967 -0.3856 -0.3793 -0.3753 -0.3725 -0.3705 35 -0.5242 -0.4500 -0.4255 -0.4139 -0.4073 -0.4030 -0.4001 -0.3980 34 -0.5563 -0.4800 -0.4545 -0.4424 -0.4355 -0.4310 -0.4280 -0.4257 33 -0.5878 -0.5100 -0.4836 -0.4710 -0.4638 -0.4592 -0.4560 -0.4537 32 -0.6187 -0.5400 -0.5129 -0.4999 -0.4924 -0.4877 -0.4844 -0.4820 31 -0.6490 -0.5700 -0.5423 -0.5290 -0.5213 -0.5164 -0.5130 -0.5105 30 -0.6787 -0.6000 -0.5719 -0.5582 -0.5504 -0.5454 -0.5419 -0.5394 29 -0.7077 -0.6300 -0.6016 -0.5878 -0.5798 -0.5747 -0.5712 -0.5686 28 -0.7360 -0.6600 -0.6316 -0.6176 -0.6095 -0.6044 -0.6008 -0.5982 27 -0.7636 -0.6900 -0.6617 -0.6477 -0.6396 -0.6344 -0.6308 -0.6282 26 -0.7904 -0.7200 -0.6921 -0.6781 -0.6701 -0.6649 -0.6613 -0.6587 25 -0.8165 -0.7500 -0.7226 -0.7089 -0.7009 -0.6958 -0.6922 -0.6896 24 -0.8417 -0.7800 -0.7535 -0.7401 -0.7322 -0.7271 -0.7236 -0.7211 23 -0.8662 -0.8100 -0.7846 -0.7716 -0.7640 -0.7590 -0.7556 -0.7531 22 -0.8897 -0.8400 -0.8160 -0.8036 -0.7962 -0.7915 -0.7882 -0.7858 21 -0.9124 -0.8700 -0.8478 -0.8360 -0.8291 -0.8245 -0.8214 -0.8192 20 -0.9342 -0.9000 -0.8799 -0.8690 -0.8625 -0.8583 -0.8554 -0.8533 19 -0.9550 -0.9300 -0.9123 -0.9025 -0.8966 -0.8928 -0.8901 -0.8882 18 -0.9749 -0.9600 -0.9452 -0.9367 -0.9315 -0.9281 -0.9258 -0.9241 17 -0.9939 -0.9900 -0.9785 -0.9715 -0.9671 -0.9643 -0.9624 -0.9610 16 -1.0119 -1.0200 -1.0124 -1.0071 -1.0037 -1.0015 -1.0000 -0.9990 15 -1.0288 -1.0500 -1.0467 -1.0435 -1.0413 -1.0399 -1.0389 -1.0382 14 -1.0448 -1.0800 -1.0817 -1.0808 -1.0800 -1.0794 -1.0791 -1.0789 13 -1.0597 -1.1100 -1.1173 -1.1192 -1.1199 -1.1204 -1.1208 -1.1212 12 -1.0736 -1.1400 -1.1537 -1.1587 -1.1613 -1.1630 -1.1643 -1.1653 11 -1.0864 -1.1700 -1.1909 -1.1995 -1.2043 -1.2075 -1.2098 -1.2115 10 -1.0982 -1.2000 -1.2290 -1.2419 -1.2492 -1.2541 -1.2576 -1.2602 9 -1.1089 -1.2300 -1.2683 -1.2860 -1.2964 -1.3032 -1.3081 -1.3118 8 -1.1184 -1.2600 -1.3088 -1.3323 -1.3461 -1.3554 -1.3620 -1.3670 7 -1.1269 -1.2900 -1.3508 -1.3810 -1.3991 -1.4112 -1.4199 -1.4265 6 -1.1342 -1.3200 -1.3946 -1.4329 -1.4561 -1.4717 -1.4829 -1.4914 5 -1.1405 -1.3500 -1.4407 -1.4887 -1.5181 -1.5381 -1.5525 -1.5635 4 -1.1456 -1.3800 -1.4897 -1.5497 -1.5871 -1.6127 -1.6313 -1.6454 3 -1.1496 -1.4100 -1.5427 -1.6181 -1.6661 -1.6993 -1.7235 -1.7420 2 -1.1524 -1.4400 -1.6016 -1.6982 -1.7612 -1.8053 -1.8379 -1.8630 1 -1.1541 -1.4700 -1.6714 -1.8008 -1.8888 1 -1.9520 -1.9994 -2.0362 City Project No: 26122 Issue For Bids C-110-6 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. ASTM International (ASTM) ASTM E178 Standard Practice for Dealing with Outlying Observations END OF ITEM C-110 City Project No: 26122 Issue For Bids C-110-7 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY LEFT BLANK City Project No: 26122 Issue For Bids C-110-8 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 ITEM P-101 PREPARATION/REMOVAL OF EXISTING PAVEMENTS DESCRIPTION 101-1.1 This item shall consist of preparation of existing pavement surfaces for overlay,surface treatments, removal of existing pavement, and other miscellaneous items. The work shall be accomplished in accordance with these specifications and the applicable plans. 101-1.2 Limits of cold milling are estimated in the plans. Actual limits of these items shall be coordinated with the Engineer prior to construction. EQUIPMENT AND MATERIALS 101-2 All equipment and materials shall be specified here and in the following paragraphs or approved by the Resident Project Representative (RPR). The equipment shall not cause damage to the pavement to remain in place. CONSTRUCTION 101-3.1 Removal of existing pavement. The Contractor's removal operation shall be controlled to not damage adjacent pavement structure, and base material, cables, utility ducts, pipelines, or drainage structures which are to remain under the pavement. a. Concrete pavement removal. Full depth saw outs shall be made perpendiGular to the slab surfa%. The ContraGtor shall saw through the full depth of the slab inGluding any dowels at the j0iRt, removing the pavement and installing new dowels as shown on the plans and per the speoifiGations. WheFe the peFimeteF of the Femoval limits is not loeated on the joint and theFe aFe no dowels present, the peFimeteF shall be saw out the full depth of the pavement. The pavement inside the saw out shall be Femoved by methods which will not eause diStFess on the pavement whooh is tO Femain on plaee. if the mateFial is to be wasted on the airpert site, it shall be redUGed to a maximum size ef L==]. Genr--.rp-te that are damaged by under hreaLiRg shall be repaired a remeved and replaGed as direGted by the RPR The edge ef existing GeRGFete pavemeRt against whiGh Rew pavement abuts shall be proteGted from damage at all tomes. Spall and LARderbreak repair shall be iR aGGerdaRGe with the plans. Any underlaying material that is te remaiR OR plaGe, shall be FeGempaGted andler replaGed as shGWR en the plans. AdjaG areas damaged dUFiRg repair shall be repaired er replaGed at the GeRtraGter's expense. b. Asphalt pavement removal. Asphalt pavement te be rerneved shall be GUt tG the full depth ef t14e- asphalt pavement areund the perimeter ef the area te be rerneved. if the material is te be wasted eR the airpert site, it shall be broken te a maximurn size of 1 iRGhes and SteGkpiled as direGted by AirPO4-. c;. Repair or removal of Base, Subbase,andior Subgrade. All failed material inGluding surfaGe, base Geurse,subbase Geurse,and subgrade shall be remeved and repaired as shown en the plans or as direGted specifications. Any dama,,e caused by GontFactOF's removal process shall be repaiFed at the ContFaCtEWS expense. cl DispesaL All existing pavement removed shall be disposed of off site, unless ethenviSe appffl�4e by the airpert All hauling will be considered a necessary and inGidental part of the work. its costs shag be 6onsidered by the Contractor and in6iuded in the contract unit price for the pay items of work invehed. Na payment will be made separately or-direc-t�y for hauling on an),part of the work. 101-3.2 Preparation of joints and cracks prior to overlay/surface treatment. Remove all vegetation and debris fFGFn GraGkS te a niononium depth of 1 ORGh. If extensive vegetatien exists, treat the speGifiG area w'th a GonGentrated 6()!'-tmOn Of A Water based herbiGide appreved by the RPR. Fill all GraGks greater than 1114 'nr--.h vVide with a GraGk sealant per ARTM D6690. The GraGk sealant, preparatien, and appliGation shall City Project No: 26122 Issue For Bids P-101-1 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 into c-rask sealer shall he removed from thepavement surtase Wider GraE;ks (over 1-112 inGh wide), along with SE)ft OF SURkeR SPEAS, 'RdiGate that the paveMeRt or th& paveMeRt base should be repaired or rep!aE;ed as stated below. Cracks and jOiRtS may be filled with a mixture of emulsified asphalt and aggregate. The aggregate shalt rnmbined gradation shall he as shn�nm in the table G radatien Sieve Size Dereent PassPassingPassing No 4 /4 7ti mm\ 4-99 N o 8 (7 3F m m) 904-Go No 16 (1.18 mm) 65-40 49-&g No. 50 (3n� 00-prmrr) 2-5-42- Np Inn (150 p m) 4-5-30 No. 200 (75 pm) 4�� Up to 0 Gement Gan be added to aGGeleFate the set tome. The mixture shall net e0ntain Mere than 201% natural s nd w'thoi h approval On writing from the RPR The proportions of asphalt emulsion and aggregate shall be determined in the field and may be varied tG facmi'tate GORStFUGtOOR requirements. Normally, these proportions will be approximately ORe part asphalt emulsion to five parts aggregate by volume. The material shall be poured OF plaGed intO the jOints OF GFaGks and GompaGted to form a voidless mass. The joint OF GraGk shall be foiled to within +0 to -1/8 inGhes of the surfaee.Any material spoiled outside the width of the joint shall be removed fFOFn the pavement suFfaE;e PFOOF on the pavement s��rfaee and vegetation On the joints need to be removed. overlay, e treatmeRt shall GeRS'St of remeval of rubber, fuel spills, eil, GraGk sealer, at least or remarking. of paiRt, and ether feFemgR substanGes frem the surfaG8 ef the pavemeRt. Areas that require remeval are designated en th& plans anrd as rdireoterd by the RPR in the field during s nstri istien CherniGals, high pressure water, heater SGapifier (asphaltiG GenGrete only), Geld FnilliRg, retary grinding, er Sandb!aSt'Rg may be used. If Ghem'Gals are used, they shall Gernply with the state's emAmi.penimnenttail preteGtien regulatiens. Rerneval methods used shall Ret Gause majer damage to the pavement, er te aW StFUGtUre or utility within er adjaGeRt tO the werk area. Majer damage is defiRed as GhaRgiRg the prepert' ef the pavement, removal of asphalt GaLJSORg the aggregate te ravel, er removing pavement ever 1/8 inGh deep. if it is deemed by the RPR that damage te the existing pavement is Gaused by eperatmenal errer, SUG4 damaged area without o ation anrd as rdireoterd by the QDQ Removal Of fDFemgn substanees shall not proceed unto! appFGved by the RPR. Water used fOF high pFessure wateF equipment shall be provided by the ContFaCtOF at the ContFacter's e)(pense. No material shall be deposited on the pavement shoulders.All wastes shall be disposed of in areas ind'Gated on this SpeGif'Gatio.n or shown on the plans. 101_3 A Concretes .ill or failed asphaltic concrete pavement repair. a. Repair of concrete spalls in areas to be overlaid with asphalt. The ContFacter shall Fepair all spalled GGRGrete as shewn eR the plans or as diFeGted by the RPR.The perimeter of the repair shall be saw Gut a minimum ef 2 inGhes eutsmde the affeGted area and 2 inGhes deep. The deterierated material shall be remeved te a depth where the existing material is form er GaRRet be easily remeved with a geelegist POGk. City Project No: 26122 Issue For Bids P-101-2 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 The rerneved area shall be foiled with asphalt mixture with aggregate sized apprepriately for the depth of the patGh. The material shall be compacted with eqUipMeRt approved by the RPR URtil the material is deRS& and no movement OF maFks aFe visible. The mateFial shall not be placed on liftS OVeF 4 inches in depth. This b. Asphalt pavement repair. The GontraGtor shall repair all spalled E;onGrete asphalt pavement as shown on the plans or as direGted by the RPR. The failed areas shall be removed as speGified on paragrap4 SpeGifiGatiGRS. 101-3.5 Cold milling. Milling shall be performed with a power-operated milling machine or grinder, capable of producing a uniform finished surface. The milling machine or grinder shall operate without tearing or gouging the underlaying surface. The milling machine or grinder shall be equipped with grade and slope controls, and a positive means of dust control. All millings shall be removed and disposed of in on-site areas designated by the airport. If the Contractor mills or grinds deeper or wider than the plans specify, the Contractor shall replace the material removed with new material at the Contractor's Expense. a. Patching. The milling machine shall be capable of cutting a vertical edge without chipping or spalling the edges of the remaining pavement and it shall have a positive method of controlling the depth of cut. The RPR Contractor shall layout the area to be milled with a straightedge in increments of 1-foot widths. The Contractor's layout shall be approved by the RPR prior to beginning milling operations. The area to be milled shall cover only the failed area. Any excessive area that is milled because the Contractor doesn't have the appropriate milling machine, or areas that are damaged because of his negligence, shall be repaired by the Contractor at the Contractor's Expense. b. Profiling, grade correction, or surface correction. The milling machine shall have a minimum width of 7 feet and it shall be equipped with electronic grade control devices that will cut the surface to the grade specified. The tolerances shall be maintained within +0 inch and -1/4 inch of the specified grade. The machine must cut vertical edges and have a positive method of dust control. The machine must have the ability to remove the millings or cuttings from the pavement and load them into a truck. All millings shall be removed and disposed of in on-site areas designated by the airport. c. Clean-up. The Contractor shall sweep the milled surface daily and immediately after the milling until all residual materials are removed from the pavement surface. Prior to paving, the Contractor shall wet down the milled pavement and thoroughly sweep and/or blow the surface to remove loose residual material. Waste materials shall be collected and removed from the pavement surface and adjacent areas by sweeping or vacuuming. Waste materials shall be removed and disposed off Airport property. Preparation of asphalt paverneent surf Ges prior to q-1danp treatment. Existing asphalt pavements to be treated y.fmth o c,1rfono treatment shall be prepared as fellows: dust,a. PatGh asphalt pavernent surfar.es that have been softened by petroleum derivatives er have failed due to aRY Gth8F Gause. Remove damaged pavernent te the full depth of the damage and repl-ArUe v.fith ni-Q).AW asphalt paveMeRt similar te that of the i " _ , ReRt iR aGGE)rdaRG8 with paragraph 101 3.4b. b. Repair joints and cracks On accordanee with paFagFaph 101 3.2. e. Remove eil or grease that has not penetrated the asphalt pavement by SOFUbbing with a deteFgent and washing thoroughly with clean water. AfteF cleaning, tFeat these aFeas with an on! spot primer. d. Clean pavement surface immediately PF'or to placing the suFface treatment so that it is fFee of dirt,gfease,=vegetation, eil o y type f objeetir. r.ahl urfacr�r 101-3.7 Maintenance.The Contractor shall perform all maintenance work necessary to keep the pavement in a satisfactory condition until the full section is complete and accepted by the RPR. The surface shall be kept clean and free from foreign material. The pavement shall be properly drained at all times. If cleaning City Project No: 26122 Issue For Bids P-101-3 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 is necessary or if the pavement becomes disturbed, any work repairs necessary shall be performed at the Contractor's expense. maternal, Glean and dry the joints of all sGale, dirt, dust, old sealant, GuriRg GOMPOund, mois;WR and othe. foreigR matter. The GORtraGtor shall demORStrate, in the presenE;e of the 101-3.8 Preparation of joints On Rigid Pavement prier to resealing. Prior to appliGation of sealant that the method used GleaRS the joint and does not damage the joint101-3 R I Rprnnval of Existing joint Sealant All existing joint sealants Will he removed by plowing or us& of hand teols. Any remain 0 ng E;ealant and er debris v.411 be remaved by use of wiree rar other teels as flush out joint vVith v.fater-and- nthp;teel Cleaning priorto sealing. Immediately befe-re seapling,joints shall be Gleaned b, reFnaiRing laitanr--e and other foreign material UAW 9;--ff1r-1LQAt time to dry out joints priGr to sealing. jGipt r"f-racrC� Will he ;-wfar---dry prier to inotallatinn of sealant. 3 'nont C;Aalant 'AmAt m;4ttQrM;4I ;;nrl will htQ AGGerdanGe with [ item P-605 item ' -604 �T material, GleaR and dry the j9iRtS of all sGale, dirt, dust, eld sealant, GUFiRg GOMPGURd, meisture and ether- f0FeigR matter. The GORtraGter shall demGRStrate, OR the pFesenGe of the RPR, the methed used Gleans the nraGks and does not damage thepavement. 101-3.9.1 Preparation of Crack. Widen crack with FOuter by Femoving a minimum of 1/16 inch fFOm eaeli side ef GraGk. Immediately befere sealing, GraGks will be blown out with a hot air IaRGe Gombined with and ..ater_free a ed 101-3.9.2 Removal of Existing Crack Sealant. EXiStiRg sealants will be removed by routing. Felle i reuting an, lebros will be removed by use of a het lanGe Gembined with eil and water-free nampressed air. 101-3.9.3 CraGk Sealant. GraGk sea!aRt material and installation will be iR aGGOrdanGe with paFagFaph 104- 101-3 10 Removal of Dine and ether R,iried Ctri inturec a Removal of Cvictinn Dope Material Nat i iced. b Removal of Inle &M.11 an holes Not used. METHOD OF MEASUREMENT 101-4.1 Pavement Markings Removal.The unit of measurement for pavement markings removal shall be per square foot. The location shall be as shown in the plans. 101-4.2 Cold milling. The unit of measure for cold milling shall be per square yard. The location and average depth of the cold milling shall be as shown on the plans. If the initial cut does not correct the condition, the Contractor shall re-mill the area and will be paid for the total depth of milling. BASIS OF PAYMENT 101-5.1 Payment. Payment shall be made at contract unit price for the unit of measurement as specified above. This price shall be full compensation for furnishing all materials and for all preparation, hauling, and placing of the material and for all labor, equipment, tools, and incidentals necessary to complete this item. Item P-101-5.1 Pavement Markings Removal- per square foot Item P-101-5.2 Cold Milling (2" depth)- per square yard City Project No: 26122 Issue For Bids P-101-4 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. Advisory Circulars (AC) AC 150/5380-6 Guidelines and Procedures for Maintenance of Airport Pavements. ASTM International (ASTM) ASTM D6690 Standard Specification for Joint and Crack Sealants, Hot Applied, for Concrete and Asphalt Pavements END OF ITEM P-101 City Project No: 26122 Issue For Bids P-101-5 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY LEFT BLANK City Project No: 26122 Issue For Bids P-101-6 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 ITEM P-152 EXCAVATION, SUBGRADE, AND EMBANKMENT DESCRIPTION 152-1.1 This item covers excavation, disposal, placement, and compaction of all materials within the limits of the work required to construct safety areas, runways, taxiways, aprons, and intermediate areas as well as other areas for drainage, building construction, parking, or other purposes in accordance with these specifications and in conformity to the dimensions and typical sections shown on the plans. 152-1.2 Classification. All material excavated shall be classified as defined below: a. Unclassified excavation. Unclassified excavation shall consist of the excavation and disposal of all material, regardless of its nature. 152-1.3 Unsuitable excavation. Unsuitable material shall be disposed in designated off-site waste areas or as directed by the Engineer. Materials containing vegetable or organic matter, such as muck, peat, organic silt, or sod shall be considered unsuitable for use in embankment construction. Material suitable for topsoil may be used on the embankment slope when approved by the RPR. Undercutting of material unsatisfactory for subgrade foundation, roads, shoulders, or areas intended for turfing shall be considered unsuitable excavation and shall be excavated to the depth specified by the Engineer below the subgrade. CONSTRUCTION METHODS 152-2.1 General. BefGFe beginning excavation, gFading, and embankment opeFations in any aFea, the area shallTea-red-or eleared and grubbed on aGGOFdanee-with-item r. The suitability of material to be placed in embankments shall be subject to approval by the RPR. All unsuitable material shall be disposed of in waste areas as shown on the plans. All waste areas shall be graded to allow positive drainage of the area and adjacent areas. The surface elevation of waste areas shall be specified on the plans or approved by the RPR. When the Contractor's excavating operations encounter artifacts of historical or archaeological significance, the operations shall be temporarily discontinued and the RPR notified per Section 70, paragraph 70-20. At the direction of the RPR,the Contractor shall excavate the site in such a manner as to preserve the artifacts encountered and allow for their removal. Such excavation will be paid for as extra work. Areas outside the limits of the pavement areas where the top layer of soil has become compacted by hauling or other Contractor activities shall be scarified and disked to a depth of 4 inches, to loosen and pulverize the soil. Stones or rock fragments larger than two(2)-inches 4 R;Ghea in their greatest dimension will not be permitted in the top 6 inches of the subgrade or top 4 inches of areas to be returned to preconstruction condition. If it is necessary to interrupt existing surface drainage, sewers or under-drainage, conduits, utilities, or similar underground structures, the Contractor shall be responsible for and shall take all necessary precautions to preserve them or provide temporary services. When such facilities are encountered, the Contractor shall notify the RPR, who shall arrange for their removal if necessary. The Contractor, at their own expense, shall satisfactorily repair or pay the cost of all damage to such facilities or structures that may result from any of the Contractor's operations during the period of the contract. a. Blasting. Blasting shall not be allowed. 152-2.2 Excavation. No excavation shall be started until the work has been staked out by the Contractor and the RPR has obtained from the Contractor, the survey notes of the elevations and measurements of the ground surface. The Contractor and RPR shall agree that the original ground lines shown on the original topographic mapping are accurate, or agree to any adjustments made to the original ground lines. Digital terrain model (DTM)files of the existing surfaces, finished surfaces and other various surfaces were used to develop the design plans. City Project No: 26122 Issue For Bids P-152-1 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 All areas to be excavated shall be stripped of vegetation and topsoil. Topsoil shall be stockpiled for future use in areas designated on the plans or by the RPR. All suitable excavated material shall be used in the formation of embankment, subgrade, or other purposes as shown on the plans. All unsuitable material shall be disposed of as described in paragraph 152-1.3 shOWR on the plan The grade shall be maintained so that the surface is well drained at all times. When the volume of the excavation exceeds that required to construct the embankments to the grades as indicated on the plans, the excess shall be used to grade the areas of ultimate development or disposed as directed by the RPR. When the volume of excavation is not sufficient for constructing the embankments to the grades indicated, the deficiency shall be obtained from borrow areas. a. Selective grading.When the quality of material varies significantly seleGtive gr„ iRg ,s indi aced „R the plans, the more suitable material designated by the RPR shall be used in constructing the embankment or in capping the pavement subgrade. If, at the time of excavation, it is not possible to place this material in its final location, it shall be stockpiled in approved areas until it can be placed.The more suitable material shall then be placed and compacted as specified. Selective grading shall be considered incidental to the work involved. The cost of stockpiling and placing the material shall be included in the various pay items of work involved. Selective grading will not be measured for separate payment but will be considered subsidiary to "Unclassifed Excavation." b. Undercutting. Rock, shale, hardpan, loose rock, boulders, or other material unsatisfactory for safety areas, subgrades, roads, shoulders, or any areas intended for turf shall be excavated to a minimum depth of 12 inches below the subgrade or to the depth specified by the RPR. Muck, peat, matted roots, or other yielding material, unsatisfactory for subgrade foundation, shall be removed to the depth specified. Unsuitable materials shall be disposed of as directed in paragraph 152-1.3. This excavated material shall be paid for at the contract unit price per cubic yard for Unsuitable Excavation. The excavated area shall be backfilled with suitable material obtained from the grading operations or borrow areas and compacted to specified densities. The necessary backfill will constitute a necessary part of Unsuitable Excavation part of the emba.,L.,-8Rt Where rock cuts are made, backfill with select material. Any pockets created in the rock surface shall be drained in accordance with the details shown on the plans. Undercutting will be paid as Unsuitable Excavation. c. Over-break. Over-break, including slides, is that portion of any material displaced or loosened beyond the finished work as planned or authorized by the RPR. All over-break shall be graded or removed by the Contractor and disposed of as directed by the RPR. The RPR shall determine if the displacement of such material was unavoidable and their own decision shall be final. Payment will not be made for the removal and disposal of over-break that the RPR determines as avoidable. Unavoidable over-break will be classified as "Unclassified Excavation." d. Removal of utilities. The removal of existing structures and utilities required to permit the orderly progress of work will be accomplished by someone other than the Contractor. All existing foundations shall be excavated at least 2 feet below the top of subgrade or as indicated on the plans, and the material disposed of as directed by the RPR.All foundations thus excavated shall be backfilled with suitable material and compacted as specified for embankment or as shown on the plans. All work associated with the excavation, removal, backfill, disposal, and/or stockpiling of existing structures and culverts will not be measured for separate payment but will be considered subsidiary to "Unclassified Excavation" 152-2.3 Borrow excavation. Imported material for fill or backfill under pavements shall be homogenous, free from organics, and clay balls, and other deleterious materiasl and shall have a maximum liquid limit (LL) of 40 percent and a plasticity index (PI) between 7 and 18. The material shall have a minimum of 35 percent passing the No. 200 sieve, with no soil particles exceeding 1-112 inches. 152-2.4 Drainage excavation. Drainage excavation shall consist of excavating drainage ditches including intercepting, inlet, or outlet ditches; or other types as shown on the plans. The work shall be performed in City Project No: 26122 Issue For Bids P-152-2 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 sequence with the other construction. Ditches shall be constructed prior to starting adjacent excavation operations.All satisfactory material shall be placed in embankment fills; unsuitable material shall be placed in designated waste areas or as directed by the RPR. All necessary work shall be performed true to final line, elevation, and cross-section. The Contractor shall maintain ditches constructed on the project to the required cross-section and shall keep them free of debris or obstructions until the project is accepted. This item shall not be measured for separate payment as it shall be considered subsidiary to drainage installation and overall construction costs. 152-2.5 Preparation of cut areas or areas where existing pavement has been removed. In those areas on which a subbase or base course is to be placed, the top 12 inches of subgrade shall be compacted to not less than 100 % of maximum density for non-cohesive soils, and 95% of maximum density for cohesive soils as determined by ASTM D1557. As used in this specification, "non-cohesive" shall mean those soils having a plasticity index (PI) of less than 3 as determined by ASTM D4318. 152-2.6 Preparation of embankment area. All sod and vegetative matter shall be removed from the surface upon which the embankment is to be placed. The cleared surface shall be broken up by plowing or scarifying to a minimum depth of 6 inches and shall then be compacted per paragraph 152-2.10. Sloped surfaces steeper than one (1) vertical to four (4) horizontal shall be plowed, stepped, benched, or broken up so that the fill material will bond with the existing material. When the subgrade is part fill and part excavation or natural ground, the excavated or natural ground portion shall be scarified to a depth of 12 inches and compacted as specified for the adjacent fill. No direct payment shall be made for the work performed under this section. The necessary clearing and grubbing and the quantity of excavation removed will be paid for under the respective items of work. 152-2.7 Control Strip. The first half-day of construction of subgrade and/or embankment shall be considered as a control strip for the Contractor to demonstrate, in the presence of the RPR, that the materials, equipment, and construction processes meet the requirements of this specification. The sequence and manner of rolling necessary to obtain specified density requirements shall be determined. The maximum compacted thickness may be increased to a maximum of 12 inches upon the Contractor's demonstration that approved equipment and operations will uniformly compact the lift to the specified density. The RPR must witness this demonstration and approve the lift thickness prior to full production. Control strips that do not meet specification requirements shall be reworked, re-compacted, or removed and replaced at the Contractor's expense. Full operations shall not begin until the control strip has been accepted by the RPR. The Contractor shall use the same equipment, materials, and construction methods for the remainder of construction, unless adjustments made by the Contractor are approved in advance by the RPR. 152-2.8 Formation of embankments.The material shall be constructed in lifts as established in the control strip, but not less than 6 inches nor more than 12 inches of compacted thickness. When more than one lift is required to establish the layer thickness shown on the plans, the construction procedure described here shall apply to each lift. No lift shall be covered by subsequent lifts until tests verify that compaction requirements have been met. The Contractor shall rework, re-compact and retest any material placed which does not meet the specifications. The lifts shall be placed, to produce a soil structure as shown on the typical cross-section or as directed by the RPR. Materials such as brush, hedge, roots, stumps, grass and other organic matter, shall not be incorporated or buried in the embankment. Earthwork operations shall be suspended at any time when satisfactory results cannot be obtained due to rain, freezing, or other unsatisfactory weather conditions in the field. Frozen material shall not be placed in the embankment nor shall embankment be placed upon frozen material. Material shall not be placed on surfaces that are muddy, frozen, or contain frost. The Contractor shall drag, blade, or slope the embankment to provide surface drainage at all times. City Project No: 26122 Issue For Bids P-152-3 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 The material in each lift shall be within ±2% of optimum moisture content before rolling to obtain the prescribed compaction. The material shall be moistened or aerated as necessary to achieve a uniform moisture content throughout the lift. Natural drying may be accelerated by blending in dry material or manipulation alone to increase the rate of evaporation. The Contractor shall make the necessary corrections and adjustments in methods, materials or moisture content to achieve the specified embankment density. The RPR will take samples of excavated materials which will be used in embankment for testing and develop a Moisture-Density Relations of Soils Report(Proctor)in accordance with D 1557 .A new Proctor shall be developed for each soil type based on visual classification. Density tests will be taken by the Contractor for every 3,000 square yards of compacted embankment for each lift which is required to be compacted, or other appropriate frequencies as determined by the RPR. If the material has greater than 30% retained on the 3/4-inch (19.0 mm)sieve,follow AASHTO T-180 Annex Correction of maximum dry density and optimum moisture for oversized particles. Rolling operations shall be continued until the embankment is compacted to not less than 100% of maximum density for non-cohesive soils, and 95% of maximum density for cohesive soils as determined by ASTM D1557. Under all areas to be paved, the embankments shall be compacted to a depth of 12" and to a density of not less than 95 percent of the maximum density as determined by ASTM D1557. As used in this specification, "non-cohesive" shall mean those soils having a plasticity index (PI) of less than 3 as determined by ASTM D4318. On all areas outside of the pavement areas, no compaction will be required on the top 4 inches which shall be prepared for a seedbed in accordance with Item T-901. The in-place field density shall be determined in accordance with ASTM 6938 using Procedure A, the direct transmission method, and ASTM D6938 shall be used to determine the moisture content of the material. The machine shall be calibrated in accordance with ASTM D6938. The RPR shall perform all density tests. If the specified density is not attained, the area represented by the test or as designated by the RPR shall be reworked and/or re-compacted and additional random tests made. This procedure shall be followed until the specified density is reached. Compaction areas shall be kept separate, and no lift shall be covered by another lift until the proper density is obtained. During construction of the embankment, the Contractor shall route all construction equipment evenly over the entire width of the embankment as each lift is placed. Lift placement shall begin in the deepest portion of the embankment fill.As placement progresses,the lifts shall be constructed approximately parallel to the finished pavement grade line. When rock, concrete pavement, asphalt pavement, and other embankment material are excavated at approximately the same time as the subgrade, the material shall be incorporated into the outer portion of the embankment and the subgrade material shall be incorporated under the future paved areas. Stones, fragmentary rock, and recycled pavement larger than 4 inches in their greatest dimensions will not be allowed in the top 12 inches of the subgrade. Rockfill shall be brought up in lifts as specified or as directed by the RPR and the finer material shall be used to fill the voids forming a dense, compact mass. Rock, cement concrete pavement, asphalt pavement, and other embankment material shall not be disposed of except at places and in the manner designated on the plans or by the RPR. When the excavated material consists predominantly of rock fragments of such size that the material cannot be placed in lifts of the prescribed thickness without crushing, pulverizing or further breaking down the pieces,such material may be placed in the embankment as directed in lifts not exceeding 2 feet in thickness. Each lift shall be leveled and smoothed with suitable equipment by distribution of spalls and finer fragments of rock. The lift shall not be constructed above an elevation 4 feet below the finished subgrade. City Project No: 26122 Issue For Bids P-152-4 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 There will be no separate measurement of payment for compacted embankment. All costs incidental to placing in lifts, compacting, discing, watering, mixing, sloping, and other operations necessary for construction of embankments will be included in the contract price for excavation, borrow, or other items. 152-2.9 Proof rolling. The purpose of proof rolling the subgrade is to identify any weak areas in the subgrade and not for compaction of the subgrade. After compaction is completed, the subgrade area shall be proof rolled with a heavy pneumatic-tired roller having four or more tires abreast, each tire loaded to a minimum of 30,000-pounds and inflated to a 125 psi in the presence of the RPR. Apply a minimum of 50% coverage, or as specified by the RPR, under pavement areas. A coverage is defined as the application of one tire print over the designated area. Soft areas of subgrade that deflect more than 1 inch or show permanent deformation greater than 1 inch shall be removed and replaced with suitable material or reworked to conform to the moisture content and compaction requirements in accordance with these specifications. Removal and replacement of soft areas is incidental to this item. 152-2.10 Compaction requirements. The subgrade under areas to be paved shall be compacted to a depth of 12 inches and to a density of not less than 100 percent of the maximum dry density as determined by ASTM D1557 The subgrade in areas outside the limits of the pavement areas shall be compacted to a depth of 12 inches and to a density of not less than 95 percent of the maximum density as determined by ASTM 1557. The material to be compacted shall be within±2%of optimum moisture content before being rolled to obtain the prescribed compaction (except for expansive soils). When the material has greater than 30 percent retained on the 3/4 inch (19.0 mm) sieve, follow the methods in ASTM D1557 . Tests for moisture content and compaction will be taken at a minimum of 3,000-S.Y. of subgrade. All quality assurance testing shall be done by the RPR. The in-place field density shall be determined in accordance with ASTM D6938 using Procedure A, the direct transmission method, and ASTM D6938 shall be used to determine the moisture content of the material. The machine shall be calibrated in accordance with ASTM D6938 within 12 months prior to its use on this contract. The gage shall be field standardized daily. Maximum density refers to maximum dry density at optimum moisture content unless otherwise specified. If the specified density is not attained, the entire lot shall be reworked and/or re-compacted and additional random tests made. This procedure shall be followed until the specified density is reached. All cut-and-fill slopes shall be uniformly dressed to the slope, cross-section, and alignment shown on the plans or as directed by the RPR and the finished subgrade shall be maintained. 152-2.11 Finishing and protection of subgrade. Finishing and protection of the subgrade is incidental to this item. Grading and compacting of the subgrade shall be performed so that it will drain readily. All low areas, holes or depressions in the subgrade shall be brought to grade. Scarifying, blading, rolling and other methods shall be performed to provide a thoroughly compacted subgrade shaped to the lines and grades shown on the plans. All ruts or rough places that develop in the completed subgrade shall be graded, re- compacted, and retested. The Contractor shall protect the subgrade from damage and limit hauling over the finished subgrade to only traffic essential for construction purposes. The Contractor shall maintain the completed course in satisfactory condition throughout placement of subsequent layers. No subbase, base, or surface course shall be placed on the subgrade until the subgrade has been accepted by the RPR. 152-2.12 Haul. All hauling will be considered a necessary and incidental part of the work. The Contractor shall include the cost in the contract unit price for the pay of items of work involved. No payment will be made separately or directly for hauling on any part of the work. The Contractor's equipment shall not cause damage to any excavated surface, compacted lift or to the subgrade as a result of hauling operations. Any damage caused as a result of the Contractor's hauling operations shall be repaired at the Contractor's expense. City Project No: 26122 Issue For Bids P-152-5 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 The Contractor shall be responsible for providing, maintaining and removing any haul roads or routes within or outside of the work area, and shall return the affected areas to their former condition, unless otherwise authorized in writing by the Owner. No separate payment will be made for any work or materials associated with providing, maintaining and removing haul roads or routes. 152-2.13 Surface Tolerances. In those areas on which a subbase or base course is to be placed, the surface shall be tested for smoothness and accuracy of grade and crown. Any portion lacking the required smoothness or failing in accuracy of grade or crown shall be scarified to a depth of at least 3 inches, reshaped and re-compacted to grade until the required smoothness and accuracy are obtained and approved by the RPR. The Contractor shall perform all final smoothness and grade checks in the presence of the RPR. Any deviation in surface tolerances shall be corrected by the Contractor at the Contractor's expense. a. Smoothness. The finished surface shall not vary more than +/-'/2 inch when tested with a 12-foot straightedge applied parallel with and at right angles to the centerline. The straightedge shall be moved continuously forward at half the length of the 12-footstraightedge for the full length of each line on a 50-foot grid. b. Grade. The grade and crown shall be measured on a 50-foot grid and shall be within +/-0.05 feet of the specified grade. On safety areas, turfed areas and other designated areas within the grading limits where no subbase or base is to placed, grade shall not vary more than 0.10 feet from specified grade. Any deviation in excess of this amount shall be corrected by loosening, adding or removing materials, and reshaping. 152-2.14 Topsoil. When topsoil is specified or required as shown on the plans or under Item T-905, it shall be salvaged from stripping or other grading operations. The topsoil shall meet the requirements of Item T- 905. If, at the time of excavation or stripping, the topsoil cannot be placed in its final section of finished construction, the material shall be stockpiled at approved locations. Stockpiles shall be located as shown on the plans and the approved CSPP, and shall not be placed on areas that subsequently will require any excavation or embankment fill. If, in the judgment of the RPR, it is practical to place the salvaged topsoil at the time of excavation or stripping, the material shall be placed in its final position without stockpiling or further re-handling. Upon completion of grading operations, stockpiled topsoil shall be handled and placed as shown on the plans and as required in Item T-905.Topsoil shall be paid for as provided in Item T-905. No direct payment will be made for topsoil under Item P-152. METHOD OF MEASUREMENT 152-3.1 Unclassified excavation shall not be measured for separata payement, but shall be incidental to the item in which it is contained. There will be no adjustment for additional embankment required to construct the project if the excavated material is deemed unsuitable. Work, materials, and borrow excavation required to replace the area that are deemed unsuitable shall be considered incidental to the item in which it is contained. 152-3.2 Unsuitable excavation shall not be measured for separate payment. The necessary refilling of unsuitable areas in accordance with this specification will not be measured for separate payment. BASIS OF PAYMENT 152-4.1 Unclassified excavation payment shall be incidental to the item in which it is contained. made at the contract unit price per cubic yard. including This price shall be full compensation for furnishing all materials, labor, equipment, tools, and incidentals necessary to complete the item. Payment will be made under: Item P-152-4.1 Unclassified Excavation- per cubic yard City Project No: 26122 Issue For Bids P-152-6 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Item P-152-4.2 Borrow Excavation— per cubic yard REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. American Association of State Highway and Transportation Officials (AASHTO) AASHTO T-180 Standard Method of Test for Moisture-Density Relations of Soils Using a 4.54-kg (10-Ib) Rammer and a 457-mm (18-in.) Drop ASTM International (ASTM) ASTM D698 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Standard Effort(12,400 ft-Ibf/ft3(600 kN-m/m3)) ASTM D1556 Standard Test Method for Density and Unit Weight of Soil in Place by the Sand-Cone Method ASTM D1557 Standard Test Methods for Laboratory Compaction Characteristics of Soil Using Modified Effort(56,000 ft-Ibf/ft3 (2700 kN-m/m3)) ASTM D6938 Standard Test Methods for In-Place Density and Water Content of Soil and Soil-Aggregate by Nuclear Methods (Shallow Depth) Advisory Circulars (AC) AC 150/5370-2 Operational Safety on Airports During Construction Software Software FAARFIELD—FAA Rigid and Flexible Iterative Elastic Layered Design U.S. Department of Transportation FAA RD-76-66 Design and Construction of Airport Pavements on Expansive Soils END OF ITEM P-152 City Project No: 26122 Issue For Bids P-152-7 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY LEFT BLANK City Project No: 26122 Issue For Bids P-152-8 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 ITEM P401 ASPHALT MIX PAVEMENT DESCRIPTION 401-1.1 This item shall consist of pavement courses composed of mineral aggregate and asphalt binder mixed in a central mixing plant and placed on a prepared base or stabilized course in accordance with these specifications and shall conform to the lines, grades, thicknesses, and typical cross-sections shown on the plans. Each course shall be constructed to the depth, typical section, and elevation required by the plans and shall be rolled, finished, and approved before the placement of the next course. MATERIALS 401-2.1 Aggregate. Aggregates shall consist of crushed stone, crushed gravel, crushed slag, screenings, natural sand, and mineral filler, as required. The aggregates should have no known history of detrimental pavement staining due to ferrous sulfides, such as pyrite. Coarse aggregate is the material retained on the No. 4 (4.75 mm)sieve. Fine aggregate is the material passing the No. 4 (4.75 mm)sieve. a. Coarse aggregate.Coarse aggregate shall consist of sound,tough,durable particles,free from films of matter that would prevent thorough coating and bonding with the asphalt material and free from organic matter and other deleterious substances. Coarse aggregate material requirements are given in the table below. Coarse Aggregate Material Requirements Material Test Requirement Standard Resistance to Degradation Loss: 40% maximum ASTM C131 Soundness of Aggregates Loss after 5 cycles: by Use of Sodium Sulfate or 12% maximum using Sodium sulfate- or- ASTM C88 Magnesium Sulfate 18% maximum using magnesium sulfate Clay lumps and friable 1.0% maximum ASTM C142 particles For pavements designed for aircraft gross weights of Percentage of Fractured 60,000 pounds or more: Particles Minimum 75% by weight of particles with at least two ASTM D5821 fractured faces and 85% with at least one fractured face' Flat, Elongated, or Flat and 8% maximum, by weight, of flat, elongated, or flat and ASTM D4791 Elongated Particles elongated particles at 5:1 2 Bulk.Density of slag 3 Weigh net loos than 70 p nds p G NG feet ASTM C;29 �-cm�vr-v�..r. ' The area of each face shall be equal to at least 75% of the smallest mid-sectional area of the piece. When two fractured faces are contiguous, the angle between the planes of fractures shall be at least 30 degrees to count as two fractured faces. 2 A flat particle is one having a ratio of width to thickness greater than five (5); an elongated particle is one having a ratio of length to width greater than five (5). 3—Only r Fed if slag is specified. b. Fine aggregate. Fine aggregate shall consist of clean, sound, tough, durable, angular shaped particles produced by crushing stone, slag or gravel and shall be free from coatings of clay, silt, or other objectionable matter. Natural (non-manufactured) sand may be used to obtain the gradation of the fine aggregate blend or to improve the workability of the mix. Fine aggregate material requirements are listed in the table below. City Project No: 26122 Issue For Bids P-401-1 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Fine Aggregate Material Requirements Material Test Requirement Standard Liquid limit 25 maximum ASTM D4318 Plasticity Index 4 maximum ASTM D4318 Soundness of Aggregates Loss after 5 cycles: by Use of Sodium Sulfate or 10% maximum using Sodium sulfate- or- ASTM C88 Magnesium Sulfate 15% maximum using magnesium sulfate Clay lumps and friable 1.0% maximum ASTM C142 particles Sand equivalent 45 minimum ASTM D2419 Natural Sand 15% maximum by weight of total aggregate ASTM D1073 c. Sampling. ASTM D75 shall be used in sampling coarse and fine aggregate. 401-2.2 Mineral filler. Mineral filler(baghouse fines)may be added in addition to material naturally present in the aggregate. Mineral filler shall meet the requirements of ASTM D242. Mineral Filler Requirements Material Test Requirement Standard Plasticity Index 4 maximum ASTM D4318 401-2.3 Asphalt binder. Asphalt binder shall conform to ASTM D6373 Performance Grade (PG) 76-22. Asphalt Binder PG Plus Test Requirements Material Test Requirement Standard Elastic Recovery 75% minimum ASTM D6084' ' Follow procedure B on RTFO aged binder. 401-2.4 Anti-stripping agent. Any anti-stripping agent or additive(anti-strip)shall be heat stable and shall not change the asphalt binder grade beyond specifications. Anti-strip shall be an approved material of the Department of Transportation of the State in which the project is located. COMPOSITION 401-3.1 Composition of mixture(s). The asphalt mix shall be composed of a mixture of aggregates, filler and anti-strip agent if required, and asphalt binder. The aggregate fractions shall be sized, handled in separate size groups, and combined in such proportions that the resulting mixture meets the grading requirements of the job mix formula (JMF). 401-3.2 Job mix formula (JMF) laboratory. The laboratory used to develop the JMF shall possess a current certificate of accreditation, listing D3666 from a national accrediting authority and all test methods required for developing the JMF; and be listed on the accrediting authority's website. A copy of the laboratory's current accreditation and accredited test methods shall be submitted to the Resident Project Representative (RPR) prior to start of construction. 401-3.3 Job mix formula (JMF). No asphalt mixture shall be placed until an acceptable mix design has been submitted to the RPR for review and accepted in writing. The RPR's review shall not relieve the Contractor of the responsibility to select and proportion the materials to comply with this section. When the project requires asphalt mixtures of differing aggregate gradations and/or binders, a separate JMF shall be submitted for each mix. Add anti-stripping agent to meet tensile strength requirements. City Project No: 26122 Issue For Bids P-401-2 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 The JMF shall be prepared by an accredited laboratory that meets the requirements of paragraph 401-3.2. The asphalt mixture shall be designed using procedures contained in Asphalt Institute MS-2 Mix Design Manual, 7th Edition. Samples shall be prepared and compacted using a Marshall compactor in accordance with ASTM D6926. Should a change in sources of materials be made, a new JMF must be submitted to the RPR for review and accepted in writing before the new material is used.After the initial production JMF has been approved by the RPR and a new or modified JMF is required for whatever reason, the subsequent cost of the new or modified JMF, including a new control strip when required by the RPR, will be borne by the Contractor. The RPR may request samples at any time for testing, prior to and during production, to verify the quality of the materials and to ensure conformance with the applicable specifications. The JMF shall be submitted in writing by the Contractor at least 30 days prior to the start of paving operations. The JMF shall be developed within the same construction season using aggregates proposed for project use. The JMF shall be dated, and stamped or sealed by the responsible professional Engineer of the laboratory and shall include the following items as a minimum: • Manufacturer's Certificate of Analysis (COA)for the asphalt binder used in the JMF in accordance with paragraph 401-2.3. Certificate of asphalt performance grade is with modifier already added, if used and must indicate compliance with ASTM D6373. For plant modified asphalt binder,certified test report indicating grade certification of modified asphalt binder. • Manufacturer's Certificate of Analysis (COA) for the anti-stripping agent if used in the JMF in accordance with paragraph 401-2.4. • Certified material test reports for the course and fine aggregate and mineral filler in accordance with paragraphs 401-2.1. • Percent passing each sieve size for individual gradation of each aggregate cold feed and/or hot bin; percent by weight of each cold feed and/or hot bin used; and the total combined gradation in the JMF. • Specific Gravity and absorption of each coarse and fine aggregate. • Percent natural sand. • Percent fractured faces. • Percent by weight of flat particles, elongated particles, and flat and elongated particles (and criteria). • Percent of asphalt. • Number of blows or gyrations • Laboratory mixing and compaction temperatures. • Supplier-recommended field mixing and compaction temperatures. • Plot of the combined gradation on a 0.45 power gradation curve. • Graphical plots of air voids, voids in the mineral aggregate (VMA), and unit weight versus asphalt content. To achieve minimum VMA during production, the mix design needs to account for material breakdown during production. • Tensile Strength Ratio (TSR). • Type and amount of Anti-strip agent when used. City Project No: 26122 Issue For Bids P-401-3 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 • Asphalt Pavement Analyzer(APA) results. • Date the JMF was developed. Mix designs that are not dated or which are from a prior construction season shall not be accepted. Table 1. Asphalt Design Criteria Test Property Value Test Method Number of blows or gyrations 75 Air voids (%) 3.5 ASTM D3203 Percent voids in mineral See Table 2 ASTM D6995 aggregate (VMA), minimum Tensile Strength Ratio (TSR)' not less than 80 at a saturation ASTM D4867 of 70-80% Asphalt Pavement Analyzer Less than 10 mm @ 4000 AASHTO T340 at 250 psi hose (APA)2,3 passes pressure at 64°C test temperature Test specimens for TSR shall be compacted at 7 ± 1.0 % air voids. In areas subject to freeze-thaw, use freeze-thaw conditioning in lieu of moisture conditioning per ASTM D4867 2 AASHTO T340 at 100 psi hose pressure at 64°C test temperature may be used in the interim. If this method is used the required Value shall be less than 5 mm @ 8000 passes 3 Where APA is not available, use Hamburg wheel test (AASHTO T324) 10mm @ 20,000 passes at 640C The mineral aggregate shall be of such size that the percentage composition by weight, as determined by laboratory sieves,will conform to the gradation or gradations specified in Table 2 when tested in accordance with ASTM C136 and ASTM C117. The gradations in Table 2 represent the limits that shall determine the suitability of aggregate for use from the sources of supply; be well graded from coarse to fine and shall not vary from the low limit on one sieve to the high limit on the adjacent sieve, or vice versa. Table 2. Aggregate-Asphalt Pavements Sieve Size Percentage by Weight Passing Sieve 1 inch (25.0 mm) -- 3/4 inch (19.0 mm) 100 1/2 inch (12.5 mm) 90-100 3/8 inch (9.5 mm) 72-88 No. 4 (4.75 mm) 53-73 No. 8 (2.36 mm) 38-60 No. 16 (1.18 mm) 26-48 No. 30 (600 pm) 18-38 No. 50 (300 pm) 11-27 No. 100 (150 pm) 6-18 No. 200 (75 pm) 3-6 City Project No: 26122 Issue For Bids P-401-4 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Sieve Size Percentage by Weight Passing Sieve Minimum Voids in Mineral Aggregate (VMA)' 15.0 Asphalt Percent: Stone or gravel 5.0-7.5 Slag 6.5-9.5 Recommended Minimum Construction Lift Thickness 2 inch 'To achieve minimum VMA during production, the mix design needs to account for material breakdown during production. The aggregate gradations shown are based on aggregates of uniform specific gravity. The percentages passing the various sieves shall be corrected when aggregates of varying specific gravities are used, as indicated in the Asphalt Institute MS-2 Mix Design Manual, 7th Edition. 401-3.4 Reclaimed asphalt pavement(RAP). RAP shall not be used. 401-3.5 Control Strip. Full production shall not begin until an acceptable control strip has been constructed and accepted in writing by the RPR. The Contractor shall prepare and place a quantity of asphalt according to the JMF. The underlying grade or pavement structure upon which the control strip is to be constructed shall be the same as the remainder of the course represented by the control strip. The Contractor will not be allowed to place the control strip until the Contractor quality control program (CQCP), showing conformance with the requirements of paragraph 401-5.1, has been accepted, in writing, by the RPR. The control strip will consist of at least 250 tons or 1/2 sublot, whichever is greater. The control strip shall be placed in two lanes of the same width and depth to be used in production with a longitudinal cold joint. The cold joint must be cut back in accordance with paragraph 401-4.14 using the same procedure that will be used during production. The cold joint for the control strip will be an exposed construction joint at least four (4) hours old or when the mat has cooled to less than 160°F. The equipment used in construction of the control strip shall be the same type, configuration and weight to be used on the project. The control strip will be considered acceptable by the RPR if the gradation, asphalt content, and VMA are within the action limits specified in paragraph 401-5.5a; and mat density greater than or equal to 94.5%, air voids 3.5% +/- 1%, and joint density greater than or equal to 92.5%. If the control strip is unacceptable, necessary adjustments to the JMF, plant operation, placing procedures, and/or rolling procedures shall be made and another control strip shall be placed. Unacceptable control strips shall be removed at the Contractor's expense. The control strip will be considered one lot for payment based upon the average of a minimum of 3 samples (no sublots required for control strip). Payment will only be made for an acceptable control strip in accordance with paragraph 401-8.1 using a lot pay factor equal to 100. CONSTRUCTION METHODS 401-4.1 Weather limitations. The asphalt shall not be placed upon a wet surface or when the surface temperature of the underlying course is less than specified in Table 4. The temperature requirements may be waived by the RPR, if requested; however, all other requirements including compaction shall be met. City Project No: 26122 Issue For Bids P-401-5 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Table 4. Surface Temperature Limitations of Underlying Course Base Temperature Mat Thickness (Minimum) OF 3 inches or greater 40 Greater than 2 inches 45 but less than 3 inches 401-4.2 Asphalt plant. Plants used for the preparation of asphalt shall conform to the requirements of American Association of State Highway and Transportation Officials (AASHTO) M156 including the following items. a. Inspection of plant. The RPR, or RPR's authorized representative, shall have access, at all times, to all areas of the plant for checking adequacy of equipment; inspecting operation of the plant: verifying weights, proportions, and material properties; and checking the temperatures maintained in the preparation of the mixtures. b. Storage bins and surge bins. The asphalt mixture stored in storage and/or surge bins shall meet the same requirements as asphalt mixture loaded directly into trucks. Asphalt mixture shall not be stored in storage and/or surge bins for a period greater than twelve (12) hours. If the RPR determines there is an excessive heat loss, segregation, or oxidation of the asphalt mixture due to temporary storage, temporary storage shall not be allowed. 401-4.3 Aggregate stockpile management. Aggregate stockpiles shall be constructed in a manner that prevents segregation and intermixing of deleterious materials. Aggregates from different sources shall be stockpiled, weighed and batched separately at the asphalt batch plant. Aggregates that have become segregated or mixed with earth or foreign material shall not be used. A continuous supply of materials shall be provided to the work to ensure continuous placement. 401-4.4 Hauling equipment. Trucks used for hauling asphalt shall have tight, clean, and smooth metal beds. To prevent the asphalt from sticking to the truck beds, the truck beds shall be lightly coated with a minimum amount of paraffin oil, lime solution, or other material approved by the RPR. Petroleum products shall not be used for coating truck beds. Each truck shall have a suitable cover to protect the mixture from adverse weather. When necessary, to ensure that the mixture will be delivered to the site at the specified temperature, truck beds shall be insulated or heated and covers shall be securely fastened. 401-4.4.1 Material transfer vehicle (MTV). Material transfer vehicles used to transfer the material from the hauling equipment to the paver, shall use a self-propelled, material transfer vehicle with a swing conveyor that can deliver material to the paver without making contact with the paver. The MTV shall be able to move back and forth between the hauling equipment and the paver providing material transfer to the paver, while allowing the paver to operate at a constant speed. The Material Transfer Vehicle will have remixing and storage capability to prevent physical and thermal segregation. 401-4.5 Asphalt pavers. Asphalt pavers shall be self-propelled with an activated heated screed, capable of spreading and finishing courses of asphalt that will meet the specified thickness, smoothness,and grade. The paver shall have sufficient power to propel itself and the hauling equipment without adversely affecting the finished surface. The asphalt paver shall be equipped with a control system capable of automatically maintaining the specified screed grade and elevation. If the spreading and finishing equipment in use leaves tracks or indented areas, or produces other blemishes in the pavement that are not satisfactorily corrected by the scheduled operations,the use of such equipment shall be discontinued. The paver shall be capable of paving to a minimum width specified in paragraph 401-4.12. City Project No: 26122 Issue For Bids P-401-6 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 401-4.6 Rollers. The number, type, and weight of rollers shall be sufficient to compact the asphalt to the required density while it is still in a workable condition without crushing of the aggregate, depressions or other damage to the pavement surface. Rollers shall be in good condition, clean, and capable of operating at slow speeds to avoid displacement of the asphalt. All rollers shall be specifically designed and suitable for compacting asphalt concrete and shall be properly used. Rollers that impair the stability of any layer of a pavement structure or underlying soils shall not be used. 401-4.7 Density device. The Contractor shall have on site a density gauge during all paving operations in order to assist in the determination of the optimum rolling pattern, type of roller and frequencies, as well as to monitor the effect of the rolling operations during production paving. The Contractor shall supply a qualified technician during all paving operations to calibrate the gauge and obtain accurate density readings for all new asphalt. These densities shall be supplied to the RPR upon request at any time during construction. No separate payment will be made for supplying the density gauge and technician. 401-4.8 Preparation of asphalt binder. The asphalt binder shall be heated in a manner that will avoid local overheating and provide a continuous supply of the asphalt binder to the mixer at a uniform temperature. The temperature of unmodified asphalt binder delivered to the mixer shall be sufficient to provide a suitable viscosity for adequate coating of the aggregate particles, but shall not exceed 325°F when added to the aggregate. The temperature of modified asphalt binder shall be no more than 350°F when added to the aggregate. 401-4.9 Preparation of mineral aggregate. The aggregate for the asphalt shall be heated and dried. The maximum temperature and rate of heating shall be such that no damage occurs to the aggregates. The temperature of the aggregate and mineral filler shall not exceed 350°F when the asphalt binder is added. Particular care shall be taken that aggregates high in calcium or magnesium content are not damaged by overheating. The temperature shall not be lower than is required to obtain complete coating and uniform distribution on the aggregate particles and to provide a mixture of satisfactory workability. 401-4.10 Preparation of Asphalt mixture. The aggregates and the asphalt binder shall be weighed or metered and mixed in the amount specified by the JMF. The combined materials shall be mixed until the aggregate obtains a uniform coating of asphalt binder and is thoroughly distributed throughout the mixture. Wet mixing time shall be the shortest time that will produce a satisfactory mixture, but not less than 25 seconds for batch plants. The wet mixing time for all plants shall be established by the Contractor, based on the procedure for determining the percentage of coated particles described in ASTM D2489, for each individual plant and for each type of aggregate used. The wet mixing time will be set to achieve 95% of coated particles. For continuous mix plants, the minimum mixing time shall be determined by dividing the weight of its contents at operating level by the weight of the mixture delivered per second by the mixer. The moisture content of all asphalt upon discharge shall not exceed 0.5%. 401-4.11 Application of Prime and Tack Coat. Immediately before placing the asphalt mixture, the underlying course shall be cleaned of all dust and debris. A tack coat shall be applied in accordance with Item P-603 to all vertical and horizontal asphalt and concrete surfaces prior to placement of the first and each subsequent lift of asphalt mixture. 401-4.12 Laydown plan, transporting, placing, and finishing. Prior to the placement of the asphalt, the Contractor shall prepare a laydown plan with the sequence of paving lanes and width to minimize the number of cold joints; the location of any temporary ramps; laydown temperature; and estimated time of completion for each portion of the work (milling, paving, rolling, cooling, etc.). The laydown plan and any modifications shall be approved by the RPR. Deliveries shall be scheduled so that placing and compacting of asphalt is uniform with minimum stopping and starting of the paver. Hauling over freshly placed material shall not be permitted until the material has been compacted, as specified, and allowed to cool to approximately ambient temperature. The Contractor, at their expense, shall be responsible for repair of any damage to the pavement caused by hauling operations. Contractor shall survey each lift of asphalt surface course and certify to RPR that every lot of each lift meets the grade tolerances of paragraph 401-6.2d before the next lift can be placed. City Project No: 26122 Issue For Bids P-401-7 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Edges of existing asphalt pavement abutting the new work shall be saw cut and the cut off material and laitance removed. Apply a tack coat in accordance with P-603 before new asphalt material is placed against it. The speed of the paver shall be regulated to eliminate pulling and tearing of the asphalt mat. Placement of the asphalt mix shall begin along the centerline of a crowned section or on the high side of areas with a one way slope unless shown otherwise on the laydown plan as accepted by the RPR. The asphalt mix shall be placed in consecutive adjacent lanes having a minimum width of 12.5 feet except where edge lanes require less width to complete the area. Additional screed sections attached to widen the paver to meet the minimum lane width requirements must include additional auger sections to move the asphalt mixture uniformly along the screed extension. The longitudinal joint in one course shall offset the longitudinal joint in the course immediately below by at least one foot; however, the joint in the surface top course shall be at the centerline of crowned pavements. Transverse joints in one course shall be offset by at least 10 feet from transverse joints in the previous course. Transverse joints in adjacent lanes shall be offset a minimum of 10 feet. On areas where irregularities or unavoidable obstacles make the use of mechanical spreading and finishing equipment impractical, the asphalt may be spread and luted by hand tools. The RPR may at any time, reject any batch of asphalt, on the truck or placed in the mat, which is rendered unfit for use due to contamination, segregation, incomplete coating of aggregate, or overheated asphalt mixture. Such rejection may be based on only visual inspection or temperature measurements. In the event of such rejection, the Contractor may take a representative sample of the rejected material in the presence of the RPR, and if it can be demonstrated in the laboratory, in the presence of the RPR, that such material was erroneously rejected, payment will be made for the material at the contract unit price. Areas of segregation in the surface course, as determined by the RPR, shall be removed and replaced at the Contractor's expense. The area shall be removed by saw cutting and milling a minimum of the construction lift thickness as specified in paragraph 401-3.3,Table 2 for the approved mix design. The area to be removed and replaced shall be a minimum width of the paver and a minimum of 10 feet long. 401-4.13 Compaction of asphalt mixture. After placing, the asphalt mixture shall be thoroughly and uniformly compacted by self-propelled rollers. The surface shall be compacted as soon as possible when the asphalt has attained sufficient stability so that the rolling does not cause undue displacement, cracking or shoving. The sequence of rolling operations and the type of rollers used shall be at the discretion of the Contractor. The speed of the roller shall, at all times, be sufficiently slow to avoid displacement of the hot mixture and be effective in compaction. Any surface defects and/or displacement occurring as a result of the roller, or from any other cause, shall be corrected at the Contractor's expense. Sufficient rollers shall be furnished to handle the output of the plant. Rolling shall continue until the surface is of uniform texture, true to grade and cross-section, and the required field density is obtained. To prevent adhesion of the asphalt to the roller, the wheels shall be equipped with a scraper and kept moistened with water as necessary. In areas not accessible to the roller, the mixture shall be thoroughly compacted with approved power tampers. Any asphalt that becomes loose and broken, mixed with dirt, contains check-cracking, or in any way defective shall be removed and replaced with fresh hot mixture and immediately compacted to conform to the surrounding area. This work shall be done at the Contractor's expense. Skin patching shall not be allowed. 401-4.14 Joints.The formation of all joints shall be made to ensure a continuous bond between the courses and obtain the required density. All joints shall have the same texture as other sections of the course and meet the requirements for smoothness and grade. The roller shall not pass over the unprotected end of the freshly laid asphalt except when necessary to form a transverse joint. When necessary to form a transverse joint, it shall be made by means of placing a bulkhead or by tapering the course. The tapered edge shall be cut back to its full depth and width on a City Project No: 26122 Issue For Bids P-401-8 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 straight line to expose a vertical face prior to placing the adjacent lane. In both methods, all contact surfaces shall be coated with an asphalt tack coat before placing any fresh asphalt against the joint. Longitudinal joints which have been left exposed for more than four(4) hours; the surface temperature has cooled to less than 175°; or are irregular, damaged, uncompacted or otherwise defective shall be cut back with a ^wain" wheel ^r pavement saw a maximum of 3 inches to expose a clean, sound, uniform vertical surface for the full depth of the course. All cutback material and any Iaitance produced from cutting joints shall be removed from the project. Asphalt tack coat in accordance with P-603 shall be applied to the clean, dry joint prior to placing any additional fresh asphalt against the joint. The cost of this work shall be considered incidental to the cost of the asphalt. 401-4.15 Saw-cut grooving. SaW-GUt gF0OVoo shall be provided as specified in I4om P-624 Saw-cut grooving is not required. 401-4.16 Diamond grinding. Diamond grinding shall be completed prior to pavement grooving. Diamond grinding shall be accomplished by sawing with saw blades impregnated with industrial diamond abrasive. Diamond grinding shall be performed with a machine designed specifically for diamond grinding capable of cutting a path at least 3 feet wide. The saw blades shall be 1/8-inch wide with a sufficient number of blades to create grooves between 0.090 and 0.130 inches wide; and peaks and ridges approximately 1/32 inch higher than the bottom of the grinding cut. The actual number of blades will be determined by the Contractor and depend on the hardness of the aggregate. Equipment or grinding procedures that cause ravels, aggregate fractures, spalls or disturbance to the pavement will not be permitted. Contractor shall demonstrate to the RPR that the grinding equipment will produce satisfactory results prior to making corrections to surfaces. Grinding will be tapered in all directions to provide smooth transitions to areas not requiring grinding. The slurry resulting from the grinding operation shall be continuously removed and the pavement left in a clean condition. The GontFact r shall ply a surface treatment p r P 608 to all aFeas that have been subjeet to gFinding. 401-4.17 Nighttime paving requirements. The Contractor shall provide adequate lighting during any nighttime construction. A lighting plan shall be submitted by the Contractor and approved by the RPR prior to the start of any nighttime work. All work shall be in accordance with the approved CSPP and lighting plan. CONTRACTOR QUALITY CONTROL (CQC) 401-5.1 General. The Contractor shall develop a Contractor Quality Control Program (CQCP) in accordance with Item C-100. No partial payment will be made for materials without an approved CQCP. 401-5.2 Contractor quality control (QC) facilities. The Contractor shall provide or contract for testing facilities in accordance with Item C-100. The RPR shall be permitted unrestricted access to inspect the Contractor's QC facilities and witness QC activities. The RPR will advise the Contractor in writing of any noted deficiencies concerning the QC facility, equipment, supplies, or testing personnel and procedures. When the deficiencies are serious enough to be adversely affecting the test results,the incorporation of the materials into the work shall be suspended immediately and will not be permitted to resume until the deficiencies are satisfactorily corrected. 401-5.3 Contractor QC testing. The Contractor shall perform all QC tests necessary to control the production and construction processes applicable to these specifications and as set forth in the approved CQCP. The testing program shall include, but not necessarily be limited to, tests for the control of asphalt content, aggregate gradation, temperatures, aggregate moisture, field compaction, and surface smoothness. A QC Testing Plan shall be developed as part of the CQCP. a. Asphalt content. A minimum of two tests shall be performed per day in accordance with ASTM D6307 or ASTM D2172 for determination of asphalt content. When using ASTM D6307, the correction factor shall be determined as part of the first test performed at the beginning of plant production; and as part of every tenth test performed thereafter. The asphalt content for the day will be determined by averaging the test results. City Project No: 26122 Issue For Bids P-401-9 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 b. Gradation. Aggregate gradations shall be determined a minimum of twice per day from mechanical analysis of extracted aggregate in accordance with ASTM D54441 ASTM C136, and ASTM C117. c. Moisture content of aggregate. The moisture content of aggregate used for production shall be determined a minimum of once per day in accordance with ASTM C566. d. Moisture content of asphalt.The moisture content shall be determined once per day in accordance with AASHTO T329 or ASTM D1461. e. Temperatures. Temperatures shall be checked, at least four times per day, at necessary locations to determine the temperatures of the dryer, the asphalt binder in the storage tank, the asphalt at the plant, and the asphalt at the job site. f. In-place density monitoring. The Contractor shall conduct any necessary testing to ensure that the specified density is being achieved. A nuclear gauge may be used to monitor the pavement density in accordance with ASTM D2950. g. Smoothness for Contractor Quality Control. The Contractor shall perform smoothness testing in transverse and longitudinal directions daily to verify that the construction processes are producing pavement with variances less than '/4 inch in 12 feet, identifying areas that may pond water which could lead to hydroplaning of aircraft. If the smoothness criteria is not met,appropriate changes and corrections to the construction process shall be made by the Contractor before construction continues The Contractor may use a 12-foot straightedge, a rolling inclinometer meeting the requirements of ASTM E2133, or rolling external reference device that can simulate a 12-foot straightedge, approved by the RPR. Straight-edge testing shall start with one-half the length of the straightedge at the edge of pavement section being tested and then moved ahead one-half the length of the straightedge for each successive measurement. Testing shall be continuous across all joints. The surface irregularity shall be determined by placing the freestanding (unleveled) straightedge on the pavement surface and allowing it to rest upon the two highest spots covered by its length, and measuring the maximum gap between the straightedge and the pavement surface in the area between the two high points. If the rolling inclinometer or external reference device is used, the data may be evaluated using either the FAA profile program, Pro FAA, or FHWA ProVal, using the 12-foot straightedge simulation function. Smoothness readings shall not be made across grade changes or cross slope transitions. The transition between new and existing pavement shall be evaluated separately for conformance with the plans. (1) Transverse measurements. Transverse measurements shall be taken for each day's production placed. Transverse measurements shall be taken perpendicular to the pavement centerline each 50 feet or more often as determined by the RPR. The joint between lanes shall be tested separately to facilitate smoothness between lanes. (2) Longitudinal measurements. Longitudinal measurements shall be taken for each day's production placed. Longitudinal tests shall be parallel to the centerline of paving; at the center of paving lanes when widths of paving lanes are less than 20 feet; and at the third points of paving lanes when widths of paving lanes are 20 ft or greater.When placement abuts previously placed material the first measurement shall start with one half the length of the straight edge on the previously placed material. Deviations on the final surface course in either the transverse or longitudinal direction that will trap water greater than 1/4 inch shall be corrected with diamond grinding per paragraph 401-4.16 or by removing and replacing the surface course to full depth. Grinding shall be tapered in all directions to provide smooth transitions to areas not requiring grinding. All areas in which diamond grinding has been performed shall be subject to the final pavement thickness tolerances specified in paragraph 401-6.1d(3). Areas that have. been ground shall be sealed I.A.dh A j.;1 irf Ge treatment on aGGE)rdanGe with Itern P To avoid the surface treatment creating any conflict with runway or taxiway markings, it may be necessary to seal a larger area. Control charts shall be kept to show area of each day's placement and the percentage of corrective grinding required. Corrections to production and placement shall be initiated when corrective grinding is City Project No: 26122 Issue For Bids P-401-10 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 required. If the Contractor's machines and/or methods produce significant areas that need corrective actions in excess of 10 percent of a day's production, production shall be stopped until corrective measures are implemented by the Contractor. h. Grade. Grade shall be evaluated daily to allow adjustments to paving operations when grade measurements do not meet specifications. As a minimum, grade shall be evaluated prior to and after the placement of the first lift and after placement of the surface lift. Measurements will be taken at appropriate gradelines (as a minimum at center and edges of paving lane) and longitudinal spacing as shown on cross-sections and plans. The final surface of the pavement will not vary from the gradeline elevations and cross-sections shown on the plans by more than 1/2 inch vertically. The documentation will be provided by the Contractor to the RPR by the end of the following working day. Areas with humps or depressions that exceed grade or smoothness criteria and that retain water on the surface must be ground off provided the course thickness after grinding is not more than 1/2 inch less than the thickness specified on the plans. Grinding shall be in accordance with paragraph 401-4.16. The Contractor shall repair low areas or areas that cannot be corrected by grinding by removal of deficient areas to the depth of the final course plus 1/2 inch and replacing with new material. Skin patching is not allowed. 401-5.4 Sampling. When directed by the RPR, the Contractor shall sample and test any material that appears inconsistent with similar material being sampled, unless such material is voluntarily removed and replaced or deficiencies corrected by the Contractor. All sampling shall be in accordance with standard procedures specified. 401-5.5 Control charts. The Contractor shall maintain linear control charts for both individual measurements and range (i.e. difference between highest and lowest measurements) for aggregate gradation, asphalt content, and VMA. The VMA for each day will be calculated and monitored by the QC laboratory. Control charts shall be posted in a location satisfactory to the RPR and kept current. As a minimum, the control charts shall identify the project number, the contract item number, the test number, each test parameter, the Action and Suspension Limits applicable to each test parameter, and the Contractor's test results. The Contractor shall use the control charts as part of a process control system for identifying potential problems and assignable causes before they occur. If the Contractor's projected data during production indicates a problem and the Contractor is not taking satisfactory corrective action, the RPR may suspend production or acceptance of the material. a. Individual measurements. Control charts for individual measurements shall be established to maintain process control within tolerance for aggregate gradation, asphalt content, and VMA. The control charts shall use the job mix formula target values as indicators of central tendency for the following test parameters with associated Action and Suspension Limits: City Project No: 26122 Issue For Bids P-401-11 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Control Chart Limits for Individual Measurements Sieve Action Limit Suspension Limit 3/4 inch (19.0 mm) ±6% ±9% 1/2 inch (12.5 mm) ±6% ±9% 3/8 inch (9.5 mm) ±6% ±9% No. 4 (4.75 mm) ±6% ±9% No. 16 (1.18 mm) ±5% ±7.5% No. 50 (300 pm) ±3% ±4.5% No. 200 (75 pm) ±2% ±3% Asphalt Content ±0.45% ±0.70% Minimum VMA -0.5% -1.0% b. Range. Control charts shall be established to control gradation process variability. The range shall be plotted as the difference between the two test results for each control parameter. The Suspension Limits specified below are based on a sample size of n = 2. Should the Contractor elect to perform more than two tests per lot, the Suspension Limits shall be adjusted by multiplying the Suspension Limit by 1.18 for n = 3 and by 1.27 for n =4. Control Chart Limits Based on Range Sieve Suspension Limit 1/2 inch (12.5 mm) 11% 3/8 inch (9.5 mm) 11% No. 4 (4.75 mm) 11% No. 16 (1.18 mm) 9% No. 50 (300 pm) 6% No. 200 (75 pm) 3.5% Asphalt Content 0.8% c. Corrective Action. The CQCP shall indicate that appropriate action shall be taken when the process is believed to be out of tolerance. The Plan shall contain rules to gauge when a process is out of control and detail what action will be taken to bring the process into control. As a minimum, a process shall be deemed out of control and production stopped and corrective action taken, if: (1) One point falls outside the Suspension Limit line for individual measurements or range; or (2)Two points in a row fall outside the Action Limit line for individual measurements. 401-5.6 QC reports. The Contractor shall maintain records and shall submit reports of QC activities daily, in accordance with Item C-100. MATERIAL ACCEPTANCE 401-6.1 Acceptance sampling and testing. Unless otherwise specified, all acceptance sampling and testing necessary to determine conformance with the requirements specified in this section will be performed by the RPR at no cost to the Contractor except that coring as required in this section shall be completed and paid for by the Contractor. City Project No: 26122 Issue For Bids P-401-12 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 a. Quality assurance (QA) testing laboratory. The QA testing laboratory performing these acceptance tests will be accredited in accordance with ASTM D3666. The QA laboratory accreditation will be current and listed on the accrediting authority's website. All test methods required for acceptance sampling and testing will be listed on the lab accreditation. b. Lot size. A standard lot will be equal to one day's production divided into approximately equal sublots of between 400 to 600 tons. When only one or two sublots are produced in a day's production, the sublots will be combined with the production lot from the previous or next day. Where more than one plant is simultaneously producing asphalt for the job,the lot sizes will apply separately for each plant. c. Asphalt air voids. Plant-produced asphalt will be tested for air voids on a sublot basis. (1) Sampling. Material from each sublot shall be sampled in accordance with ASTM D3665. Samples shall be taken from material deposited into trucks at the plant or at the job site in accordance with ASTM D979. The sample of asphalt may be put in a covered metal tin and placed in an oven for not less than 30 minutes nor more than 60 minutes to maintain the material at or above the compaction temperature as specified in the JMF. (2)Testing. Air voids will be determined for each sublot in accordance with ASTM D3203 for a set of three compacted specimens prepared in accordance with ASTM D6926. d. In-place asphalt mat and joint density. Each sublot will be tested for in-place mat and joint density as a percentage of the theoretical maximum density (TMD). (1)Sampling. The Contractor will cut minimum 5 inch diameter samples in accordance with ASTM D5361. The Contractor shall furnish all tools, labor, and materials for cleaning, and filling the cored pavement. Laitance produced by the coring operation shall be removed immediately after coring, and core holes shall be filled within one day after sampling in a manner acceptable to the RPR. (2) Bond. Each lift of asphalt shall be bonded to the underlying layer. If cores reveal that the surface is not bonded, additional cores shall be taken as directed by the RPR to determine the extent of unbonded areas. Unbonded areas shall be removed by milling and replaced at no additional cost as directed by the RPR. (3)Thickness. Thickness of each lift of surface course will be evaluated by the RPR for compliance to the requirements shown on the plans after any necessary corrections for grade. Measurements of thickness will be made using the cores extracted for each sublot for density measurement. The maximum allowable deficiency at any point will not be more than 1/4 inch less than the thickness indicated for the lift. Average thickness of lift,or combined lifts,will not be less than the indicated thickness.Where the thickness tolerances are not met, the lot or sublot shall be corrected by the Contractor at his expense by removing the deficient area and replacing with new pavement. The Contractor, at his expense, may take additional cores as approved by the RPR to circumscribe the deficient area. (4) Mat density. One core shall be taken from each sublot. Core locations will be determined by the RPR in accordance with ASTM D3665. Cores for mat density shall not be taken closer than one foot from a transverse or longitudinal joint. The bulk specific gravity of each cored sample will be determined in accordance with ASTM D2726. The percent compaction (density) of each sample will be determined by dividing the bulk specific gravity of each sublot sample by the TMD for that sublot. (5) Joint density. One core centered over the longitudinal joint shall be taken for each sublot that has a longitudinal joint. Core locations will be determined by the RPR in accordance with ASTM D3665. The bulk specific gravity of each core sample will be determined in accordance with ASTM D2726. The percent compaction (density)of each sample will be determined by dividing the bulk specific gravity of each joint density sample by the average TMD for the lot. The TMD used to determine the joint density at joints formed between lots will be the lower of the average TMD values from the adjacent lots. City Project No: 26122 Issue For Bids P-401-13 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 401-6.2 Acceptance criteria. a. General. Acceptance will be based on the implementation of the Contractor Quality Control Program (CQCP) and the following characteristics of the asphalt and completed pavements: air voids, mat density, joint density, grade. b. Air Voids and Mat density. Acceptance of each lot of plant produced material for mat density and air voids will be based on the percentage of material within specification limits (PWL). If the PWL of the lot equals or exceeds 90%, the lot will be acceptable. Acceptance and payment will be determined in accordance with paragraph 401-8.1. c. Joint density. Acceptance of each lot of plant produced asphalt for joint density will be based on the PWL. If the PWL of the lot is equal to or exceeds 90%, the lot will be considered acceptable. If the PWL is less than 90%, the Contractor shall evaluate the reason and act accordingly. If the PWL is less than 80%, the Contractor shall cease operations and until the reason for poor compaction has been determined. If the PWL is less than 71%, the pay factor for the lot used to complete the joint will be reduced by five (5) percentage points. This lot pay factor reduction will be incorporated and evaluated in accordance with paragraph 401-8.1. d. Grade. The final finished surface of the pavement shall be surveyed to verify that the grade elevations and cross-sections shown on the plans do not deviate more than 1/2 inch vertically. Cross-sections of the pavement shall be taken at a minimum 50-foot longitudinal spacing, at all longitudinal grade breaks, and at start and end of each lane placed. Minimum cross-section grade points shall include grade at centerline, ± 10 feet of centerline, and edge of taxiway pavement. The survey and documentation shall be stamped and signed by a licensed surveyor provided by the contractor. Payment for sublots that do not meet grade for over 25% of the sublot shall not be more than 95%. e. Profilograph roughness for QA Acceptance. Not used. 401-6.3 Percentage of material within specification limits (PWL). The PWL will be determined in accordance with procedures specified in Item C-110. The specification tolerance limits (L)for lower and (U) for upper are contained in Table 5. Table 5. Acceptance Limits for Air Voids and Density Test Property Pavements Specification Tolerance Limits L U Air Voids Total Mix(%) 2.0 5.0 Surface Course Mat Density(%) 92.8 - Base Course Mat Density (%) 92.0 - Joint density(%) 90.5 -- a. Outliers. All individual tests for mat density and air voids will be checked for outliers (test criterion) in accordance with ASTM E178, at a significance level of 5%. Outliers will be discarded, and the PWL will be determined using the remaining test values. The criteria in Table 5 is based on production processes which have a variability with the following standard deviations: Surface Course Mat Density(%), 1.30; Base Course Mat Density(%), 1.55; Joint Density (%), 1.55. The Contractor should note that(1)90 PWL is achieved when consistently producing a surface course with an average mat density of at least 94.5% with 1.30% or less variability, (2) 90 PWL is achieved when consistently producing a base course with an average mat density of at least 94.0% with 1.55% or less City Project No: 26122 Issue For Bids P-401-14 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 variability, and (3) 90 PWL is achieved when consistently producing joints with an average joint density of at least 92.5%with 1.55% or less variability. 401-6.4 Resampling pavement for mat density. a. General. Resampling of a lot of pavement will only be allowed for mat density, and then, only if the Contractor requests same, in writing, within 48 hours after receiving the written test results from the RPR. A retest will consist of all the sampling and testing procedures contained in paragraphs 401-6.1d and 401-6.2b. Only one resampling per lot will be permitted. (1)A redefined PWL will be calculated for the resampled lot. The number of tests used to calculate the redefined PWL will include the initial tests made for that lot plus the retests. (2) The cost for resampling and retesting shall be borne by the Contractor. b. Payment for resampled lots. The redefined PWL for a resampled lot will be used to calculate the payment for that lot in accordance with Table 6. c. Outliers. Check for outliers in accordance with ASTM E178, at a significance level of 5%. METHOD OF MEASUREMENT 401-7.1 Measurement. Asphalt shall be measured by the number of tons of asphalt used in the accepted work. Batch weights or truck scale weights will be used to determine the basis for the tonnage. BASIS OF PAYMENT 401-8.1 Payment. Payment for a lot of asphalt meeting all acceptance criteria as specified in paragraph 401-6.2 shall be made based on results of tests for mat density and air voids. Payment for acceptable lots shall be adjusted according to paragraph 401-8.1c for mat density and air voids; and paragraph 401-6.2c for joint density, subject to the limitation that: a.The total project payment for plant mix asphalt pavement shall not exceed 100 percent of the product of the contract unit price and the total number of tons of asphalt used in the accepted work. b. The price shall be compensation for furnishing all materials, for all preparation, mixing, and placing of these materials, and for all labor, equipment, tools, and incidentals necessary to complete the item. c. Basis of adjusted payment.The pay factor for each individual lot shall be calculated in accordance with Table 6. A pay factor shall be calculated for both mat density and air voids. The lot pay factor shall be the higher of the two values when calculations for both mat density and air voids are 100% or higher. The lot pay factor shall be the product of the two values when only one of the calculations for either mat density or air voids is 100% or higher. The lot pay factor shall be the lower of the two values when calculations for both mat density and air voids are less than 100%. If PWL for joint density is less than 71% then the lot pay factor shall be reduced by 5% but be no higher than 95%. For each lot accepted, the adjusted contract unit price shall be the product of the lot pay factor for the lot and the contract unit price. Payment shall be subject to the total project payment limitation specified in paragraph 401-8.1 a. Payment in excess of 100% for accepted lots of asphalt shall be used to offset payment for accepted lots of asphalt pavement that achieve a lot pay factor less than 100%. Payment for sublots which do not meet grade in accordance with paragraph 401-6.2d after correction for over 25% of the sublot shall be reduced by 5%. City Project No: 26122 Issue For Bids P-401-15 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Table 6. Price adjustment schedule' Percentage of material within Lot pay factor(percent of contract unit specification limits (PWL) price) 96— 100 106 90—95 PWL + 10 75—89 0.5 PWL + 55 55-74 1.4 PWL— 12 Below 55 Reject 2 ' Although it is theoretically possible to achieve a pay factor of 106% for each lot, actual payment above 100% shall be subject to the total project payment limitation specified in paragraph 401-8.1 a. 2 The lot shall be removed and replaced. However, the RPR may decide to allow the rejected lot to remain. In that case, if the RPR and Contractor agree in writing that the lot shall not be removed, it shall be paid for at 50% of the contract unit price and the total project payment shall be reduced by the amount withheld for the rejected lot. SSd. Profilograph Roughness. Not used. 401-8.1 Payment. Payment will be made under: Item P-401-8.1 2"Asphalt Surface Course - per ton Item P-401-8.2 Variable Depth Asphalt Base Course—per ton REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. ASTM International (ASTM) ASTM C29 Standard Test Method for Bulk Density ("Unit Weight") and Voids in Aggregate ASTM C88 Standard Test Method for Soundness of Aggregates by Use of Sodium Sulfate or Magnesium Sulfate ASTM C117 Standard Test Method for Materials Finer than 75-Nm (No. 200) Sieve in Mineral Aggregates by Washing ASTM C127 Standard Test Method for Density, Relative Density(Specific Gravity)and Absorption of Coarse Aggregate ASTM C131 Standard Test Method for Resistance to Degradation of Small-Size Coarse Aggregate by Abrasion and Impact in the Los Angeles Machine ASTM C136 Standard Test Method for Sieve or Screen Analysis of Fine and Coarse Aggregates ASTM C142 Standard Test Method for Clay Lumps and Friable Particles in Aggregates ASTM C566 Standard Test Method for Total Evaporable Moisture Content of Aggregate by Drying ASTM D75 Standard Practice for Sampling Aggregates ASTM D242 Standard Specification for Mineral Filler for Bituminous Paving Mixtures City Project No: 26122 Issue For Bids P-401-16 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 ASTM D946 Standard Specification for Penetration-Graded Asphalt Cement for Use in Pavement Construction ASTM D979 Standard Practice for Sampling Asphalt Paving Mixtures ASTM D1073 Standard Specification for Fine Aggregate for Asphalt Paving Mixtures ASTM D1188 Standard Test Method for Bulk Specific Gravity and Density of Compacted Bituminous Mixtures Using Coated Samples ASTM D2172 Standard Test Method for Quantitative Extraction of Bitumen from Asphalt Paving Mixtures ASTM D1461 Standard Test Method for Moisture or Volatile Distillates in Asphalt Paving Mixtures ASTM D2041 Standard Test Method for Theoretical Maximum Specific Gravity and Density of Bituminous Paving Mixtures ASTM D2419 Standard Test Method for Sand Equivalent Value of Soils and Fine Aggregate ASTM D2489 Standard Practice for Estimating Degree of Particle Coating of Bituminous- Aggregate Mixtures ASTM D2726 Standard Test Method for Bulk Specific Gravity and Density of Non- Absorptive Compacted Bituminous Mixtures ASTM D2950 Standard Test Method for Density of Bituminous Concrete in Place by Nuclear Methods ASTM D3203 Standard Test Method for Percent Air Voids in Compacted Dense and Open Bituminous Paving Mixtures ASTM D3381 Standard Specification for Viscosity-Graded Asphalt Cement for Use in Pavement Construction ASTM D3665 Standard Practice for Random Sampling of Construction Materials ASTM D3666 Standard Specification for Minimum Requirements for Agencies Testing and Inspecting Road and Paving Materials ASTM D4318 Standard Test Methods for Liquid Limit, Plastic Limit, and Plasticity Index of Soils ASTM D4552 Standard Practice for Classifying Hot-Mix Recycling Agents ASTM D4791 Standard Test Method for Flat Particles, Elongated Particles, or Flat and Elongated Particles in Coarse Aggregate ASTM D4867 Standard Test Method for Effect of Moisture on Asphalt Concrete Paving Mixtures ASTM D5361 Standard Practice for Sampling Compacted Asphalt Mixtures for Laboratory Testing ASTM D5444 Standard Test Method for Mechanical Size Analysis of Extracted Aggregate ASTM D5821 Standard Test Method for Determining the Percentage of Fractured Particles in Coarse Aggregate City Project No: 26122 Issue For Bids P-401-17 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 ASTM D6084 Standard Test Method for Elastic Recovery of Bituminous Materials by Ductilometer ASTM D6307 Standard Test Method for Asphalt Content of Hot Mix Asphalt by Ignition Method ASTM D6373 Standard Specification for Performance Graded Asphalt Binder ASTM D6752 Standard Test Method for Bulk Specific Gravity and Density of Compacted Bituminous Mixtures Using Automatic Vacuum Sealing Method ASTM D6925 Standard Test Method for Preparation and Determination of the Relative Density of Hot Mix Asphalt(HMA)Specimens by Means of the SuperPave Gyratory Compactor. ASTM D6926 Standard Practice for Preparation of Bituminous Specimens Using Marshall Apparatus ASTM D6927 Standard Test Method for Marshall Stability and Flow of Bituminous Mixtures ASTM D6995 Standard Test Method for Determining Field VMA based on the Maximum Specific Gravity of the Mix(Gmm) ASTM E11 Standard Specification for Woven Wire Test Sieve Cloth and Test Sieves ASTM E178 Standard Practice for Dealing with Outlying Observations ASTM E1274 Standard Test Method for Measuring Pavement Roughness Using a Profilograph ASTM E950 Standard Test Method for Measuring the Longitudinal Profile of Traveled Surfaces with an Accelerometer Established Inertial Profiling Reference ASTM E2133 Standard Test Method for Using a Rolling Inclinometer to Measure Longitudinal and Transverse Profiles of a Traveled Surface American Association of State Highway and Transportation Officials (AASHTO) AASHTO M156 Standard Specification for Requirements for Mixing Plants for Hot-Mixed, Hot-Laid Bituminous Paving Mixtures. AASHTO T329 Standard Method of Test for Moisture Content of Hot Mix Asphalt (HMA) by Oven Method AASHTO T324 Standard Method of Test for Hamburg Wheel-Track Testing of Compacted Asphalt Mixtures AASHTO T 340 Standard Method of Test for Determining the Rutting Susceptibility of Hot Mix Asphalt(APA) Using the Asphalt Pavement Analyzer(APA) Asphalt Institute (AI) Asphalt Institute Handbook MS-26, Asphalt Binder Asphalt Institute MS-2 Mix Design Manual, 7th Edition Al State Binder Specification Database Federal Highway Administration (FHWA) Long Term Pavement Performance Binder Program City Project No: 26122 Issue For Bids P-401-18 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Advisory Circulars (AC) AC 150/5320-6 Airport Pavement Design and Evaluation FAA Orders 5300.1 Modifications to Agency Airport Design, Construction, and Equipment Standards Software FAARFIELD END OF ITEM P-401 City Project No: 26122 Issue For Bids P-401-19 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY LEFT BLANK City Project No: 26122 Issue For Bids P-401-20 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 ITEM P-603 EMULSIFIED ASPHALT TACK COAT DESCRIPTION 603-1.1 This item shall consist of preparing and treating an asphalt or concrete surface with asphalt material in accordance with these specifications and in reasonably close conformity to the lines shown on the plans. MATERIALS 603-2.1 Asphalt materials. The asphalt material shall be an emulsified asphalt as specified in ASTM D3628 as an asphalt application for tack coat appropriate to local conditions. The emulsified asphalt shall not be diluted. The Contractor shall provide a copy of the manufacturer's Certificate of Analysis (COA) for the asphalt material to the Resident Project Representative (RPR) before the asphalt material is applied for review and acceptance. The furnishing of COA for the asphalt material shall not be interpreted as a basis for final acceptance. The manufacturer's COA may be subject to verification by testing the material delivered for use on the project. CONSTRUCTION METHODS 603-3.1 Weather limitations. The tack coat shall be applied only when the existing surface is dry and the atmospheric temperature is 50°F or above; the temperature has not been below 35°F for the 12 hours prior to application; and when the weather is not foggy or rainy. The temperature requirements may be waived when directed by the RPR. 603-3.2 Equipment. The Contractor shall provide equipment for heating and applying the emulsified asphalt material. The emulsion shall be applied with a manufacturer-approved computer rate-controlled asphalt distributor. The equipment shall be in good working order and contain no contaminants or diluents in the tank. Spray bar tips must be clean, free of burrs, and of a size to maintain an even distribution of the emulsion. Any type of tip or pressure source is suitable that will maintain predetermined flow rates and constant pressure during the application process with application speeds under eight(8) miles per hour or seven hundred (700)feet per minute. The equipment will be tested under pressure for leaks and to ensure proper set-up before use to verify truck set-up (via a test-shot area), including but not limited to, nozzle tip size appropriate for application, spray- bar height and pressure and pump speed, evidence of triple-overlap spray pattern, lack of leaks, and any other factors relevant to ensure the truck is in good working order before use. The distributor truck shall be equipped with a minimum 12-foot spreader spray bar with individual nozzle control with computer-controlled application rates. The distributor truck shall have an easily accessible thermometer that constantly monitors the temperature of the emulsion, and have an operable mechanical tank gauge that can be used to cross-check the computer accuracy. If the distributor is not equipped with an operable quick shutoff valve, the prime operations shall be started and stopped on building paper. The distributor truck shall be equipped to effectively heat and mix the material to the required temperature prior to application as required. Heating and mixing shall be done in accordance with the manufacturer's recommendations. Do not overheat or over mix the material. The distributor shall be equipped with a hand sprayer. Asphalt distributors must be calibrated annually in accordance with ASTM D2995. The Contractor must furnish a current calibration certification for the asphalt distributor truck from any State or other agency as approved by the RPR. A power broom and/or power blower suitable for cleaning the surfaces to which the asphalt tack coat is to be applied shall be provided. 603-3.3 Application of emulsified asphalt material. The emulsified asphalt shall not be diluted. Immediately before applying the emulsified asphalt tack coat, the full width of surface to be treated shall be swept with a power broom and/or power blower to remove all loose dirt and other objectionable material. City Project No: 26122 Issue For Bids P-603-1 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 The emulsified asphalt material shall be uniformly applied with an asphalt distributor at the rates appropriate for the conditions and surface specified in the table below. The type of asphalt material and application rate shall be approved by the RPR prior to application. EMULSIFIED ASPHALT Surface Type Residual Rate, gal/SY Emulsion Application Bar Rate, gal/SY New asphalt 0.02-0.05 0.03-0.07 Existing asphalt 0.04-0.07 0.06-0.11 Milled Surface 0.04-0.08 0.06-0.12 Concrete 0.03-0.05 0.05-0.08 After application of the tack coat, the surface shall be allowed to cure without being disturbed for the period of time necessary to permit drying and setting of the tack coat.This period shall be determined by the RPR. The Contractor shall protect the tack coat and maintain the surface until the next course has been placed. When the tack coat has been disturbed by the Contractor, tack coat shall be reapplied at the Contractor's expense. 603-3.4 Freight and waybills The Contractor shall submit waybills and delivery tickets, during progress of the work. Before the final statement is allowed, file with the RPR certified waybills and certified delivery tickets for all emulsified asphalt materials used in the construction of the pavement covered by the contract. Do not remove emulsified asphalt material from storage until the initial outage and temperature measurements have been taken.The delivery or storage units will not be released until the final outage has been taken. METHOD OF MEASUREMENT 603-4.1 The emulsified asphalt material for tack coat shall not be measured for separate payment. the emulsified asphalt material for taGk Goat shall be measured by the [ gallon ] [ tE)R ]. Volume shall be GE)FFGGted te the vol-Urne ;at 6-0-'F on -Ar--r--GrdanG8 with ASTM D1-2F5C-). The ernuhsified asphalt material paid for ..ill be thia measured quantities used On the aGG8pted work, provided that the measured quaintifies net. W re 0 everSpeGon rate. ny Mp-re0 ever the SPGG rregular areas where hand spraying ef the emuls fied asphalt material is neGessary. Water addedd te emulsified asphalt Will net hem red fern en+ BASIS OF PAYMENT 603.5-1 The emulsified asphalt material for tack coat shall not be paid separately but shall be considered subsidiary to asphalt payment items. Payment shall be at the Gc)ntraGt unit Priee P8F[ gall�[ teR ] ef emulsified asphalt M-aterial. This pFiG8 shall be fUll GOFnpensatie—n fA-.r furnishing all materials, fer al� nenessary ten nlete the item Payment .,ill he merle under: �,�,�� item� r-w � Emu lsified li-`sr'ned-Asphalt Tackper[ gallon lvn tones REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. ASTM International (ASTM) ASTM D1250 Standard Guide for Use of the Petroleum Measurement Tables City Project No: 26122 Issue For Bids P-603-2 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 ASTM D2995 Standard Practice for Estimating Application Rate and Residual Application Rate of Bituminous Distributors ASTM D3628 Standard Practice for Selection and Use of Emulsified Asphalts END ITEM P-603 City Project No: 26122 Issue For Bids P-603-3 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY LEFT BLANK City Project No: 26122 Issue For Bids P-603-4 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 ITEM P-620 RUNWAY AND TAXIWAY MARKING DESCRIPTION 620-1.1 This item shall consist of the preparation and painting of numbers, markings, and stripes on the surface of taxiways in accordance with these specifications and at the locations shown on the plans, or as directed by the Resident Project Representative (RPR). The terms "paint" and "marking material" as well as "painting" and "application of markings" are interchangeable throughout this specification. MATERIALS 620-2.1 Materials acceptance. The Contractor shall furnish manufacturer's certified test reports, for materials shipped to the project. The certified test reports shall include a statement that the materials meet the specification requirements. This certification along with a copy of the paint manufacturer's surface preparation; marking materials, including adhesion, flow promoting and/or floatation additive; and application requirements must be submitted and approved by the Resident Project Representative (RPR) prior to the initial application of markings. The reports can be used for material acceptance or the RPR may perform verification testing. The reports shall not be interpreted as a basis for payment. The Contractor shall notify the RPR upon arrival of a shipment of materials to the site. All material shall arrive in sealed containers that are easily quantifiable for inspection by the RPR. 620-2.2 Marking materials. Table 1. Marking Materials Paint' Glass Beads' Fed Std. 595 Application Rate Application Type Color Number Maximum Type Rate Minimum Waterborne Type I Type I or 11 Yellow 33538 or 33655 115 ft2/gal Gradation A 7 lb/gal or Type III Waterborne Black 37038 115 ft2/gal - - Type I or 11 Waterborne Type I Type I or 11 White 37925 115 ft2/gal Gradation A 7 lb/gal or Type III 'See paragraph 620-2.2a 'See paragraph 620-2.2b a. Paint. Paint shall be waterborne in accordance with the requirements of this paragraph. Paint colors shall comply with Federal Standard No. 595. Waterborne. Paint shall meet the requirements of Federal Specification TT-P-1952F, Type I or Type 11. The non-volatile portion of the vehicle for all paint types shall be composed of a 100% acrylic polymer as determined by infrared spectral analysis. b. Reflective media. Glass beads for white and yellow paint shall meet the requirements for Federal Specification TT-B-1325D Type 1, Gradation A, and Type 111. Type ///beads shall be used in hold lines. Glass bpeat-Is fear red and pink paint shall rneet the requirements for Type 1, Gradation A. Glass beads shall be treated with all compatible coupling agents recommended by the manufacturers of the paint and reflective media to ensure adhesion and embedment. City Project No: 26122 Issue For Bids P-620-1 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Glass beads shall not be used in black and greeR paint. Type III glass hoards shall not be used OR red and pink paint. CONSTRUCTION METHODS 620-3.1 Weather limitations. Painting shall only be performed when the surface is dry, and the ambient temperature and the pavement surface temperature meet the manufacturer's recommendations in accordance with paragraph 620-2.1. Painting operations shall be discontinued when the ambient or surface temperatures does not meet the manufacturer's recommendations. Markings shall not be applied when the wind speed exceeds 10 mph unless windscreens are used to shroud the material guns. Markings shall not be applied when weather conditions are forecasts to not be within the manufacturers' recommendations for application and dry time. 620-3.2 Equipment. Equipment shall include the apparatus necessary to properly clean the existing surface, a mechanical marking machine, a bead dispensing machine, and such auxiliary hand-painting equipment as may be necessary to satisfactorily complete the job. The mechanical marker shall be an atomizing spray-type or airless type marking machine with automatic glass bead dispensers suitable for application of traffic paint. It shall produce an even and uniform film thickness and appearance of both paint and glass beads at the required coverage and shall apply markings of uniform cross-sections and clear-cut edges without running or spattering and without over spray. The marking equipment for both paint and beads shall be calibrated daily. 620-3.3 Preparation of surfaces. Immediately before application of the paint, the surface shall be dry and free from dirt, grease, oil, Iaitance, or other contaminates that would reduce the bond between the paint and the pavement. Use of any chemicals or impact abrasives during surface preparation shall be approved in advance by the RPR. After the deaniRg peratio,s prior to paint application and 30-days after new pavement has been applied the pavement shall be flushed thoroughly to remove any remaining contaminants that would be detrimental to pavement marking adhering to new asphalt surfaces, sweeping, blowing, or rinsing with pressurized water shall be performed to ensure the surface is clean and free of grit or other debris left from the cleaning process. a. Preparation of new pavement surfaces. The area to be painted shall be cleaned by broom, blower, water blasting, or by other methods approved by the RPR to remove all contaminants, including PCC curing compounds, minimizing damage to the pavement surface. b. Preparation of pavement to remove existing markings. Existing pavement markings shall be removed by water blasting only as the primary method. A test section of marking removal shall be done prior to full removal operations. The method or equipment used for removal shall be adjusted as necessary to minimize damage to the pavement surface to the satisfaction of the owner. The removal area may need to be larger than the area of the markings to eliminate ghost markings.After removal of markings on asphalt pavements, apply a fog seal or seal coat to `block out' the removal area to eliminate `ghost' markings. c. Preparation of pavement markings prior to remarking. Prior to remarking existing markings, loose existing markings must be removed minimizing damage to the pavement surface, with a method approved by the RPR. After removal, the surface shall be cleaned of all residue or debris. Prior to the application of markings,the Contractor shall certify in writing that the surface is dry and free from dirt, grease, oil, Iaitance, or other foreign material that would prevent the bond of the paint to the pavement or existing markings. This certification along with a copy of the paint manufacturer's application and surface preparation requirements must be submitted to the RPR prior to the initial application of markings. 620-3.4 Layout of markings. The proposed markings shall be laid out in advance of the paint application. The locations of markings to receive glass beads shall be shown on the plans. Glass beads shall be applied to all final pavement markings. 620-3.5 Application. A period of 30 days shall elapse between placement of surface course or seal coat and application of the permanent paint markings. Paint shall be applied at the locations and to the City Project No: 26122 Issue For Bids P-620-2 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 dimensions and spacing shown on the plans. Paint shall not be applied until the layout and condition of the surface has been approved by the RPR. The edges of the markings shall not vary from a straight line more than 1/2 inch in 50 feet, and marking dimensions and spacing shall be within the following tolerances: Marking Dimensions and Spacing Tolerance Dimension and Spacing Tolerance 36 inch or less ±1/2 inch greater than 36 inch to 6 feet ±1 inch greater than 6 feet to 60 feet ±2 inch greater than 60 feet ±3 inch The paint shall be mixed in accordance with the manufacturer's instructions and applied to the pavement with a marking machine at the rate shown in Table 1. The addition of thinner will not be permitted. Glass beads shall be distributed upon the marked areas at the locations shown on the plans to receive glass beads immediately after application of the paint. A dispenser shall be furnished that is properly designed for attachment to the marking machine and suitable for dispensing glass beads. Glass beads shall be applied at the rate shown in Table 1. Glass beads shall not be applied to black paint or green paint. Glass beads shall adhere to the cured paint or all marking operations shall cease until corrections are made. Different bead types shall not be mixed. Regular monitoring of glass bead embedment and distribution should be performed. 620-3.6 Application--preformed thermoplastic airport pavement markings. Preformed thermoplastic pavement markings not used. 620-3.7 Control strip. Prior to the full application of airfield markings,the Contractor shall prepare a control strip in the presence of the RPR. The Contractor shall demonstrate the surface preparation method and all striping equipment to be used on the project. The marking equipment must achieve the prescribed application rate of paint and population of glass beads(per Table 1)that are properly embedded and evenly distributed across the full width of the marking. Prior to acceptance of the control strip, markings must be evaluated during darkness to ensure a uniform appearance. 620-3.8 Retro-reflectance. Reflectance shall be measured with a portable retro-ref1ectometer meeting ASTM E1710 (or equivalent). Readings shall be taken as specified in the table below. The average of the test values for each marking type shall meet the minimum retro-reflectance values specified. The RPR shall determine the location of testing and may approve modifications to the table below. A. +^+al of 6 reading shall be +_Rkon ever a 6 square feet area with 3 readiRgS take fr(,M 8aGh diF8 tiGR. The average shall be equal to or above the minimum levels of all readings which are within 30% of each other. Retroreflectivity testing shall be performed by the contractor. Test results shall be provided to the RPR in the form of a table indicating the location of each test, type of marking, color, result, and minimum requirement. Retroreflectivity Testing Frequencies Marking Type Testing Interval Taxiway Centerline Marking 1 test per 400 linear feet City Project No: 26122 Issue For Bids P-620-3 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Minimum Retro-Reflectance Values Material Retro-reflectance mcd/m2/lux White Yellow Red Initial Type 1 3W 175 35 Initial Type III 6W 300 35 '.idol TherrneplaStiG 22-3 4-GO 35 All materials, remark when less than' 489 75 40 ' Prior to remarking determine if removal of contaminants on markings will restore retro-reflectance 620-3.9 Protection and cleanup. After application of the markings, all markings shall be protected from damage until dry. When markings are dry, Contractor to perform full water flush. All surfaces shall be protected from excess moisture and/or rain and from disfiguration by spatter, splashes, spillage, or drippings. The Contractor shall remove from the work area all debris, waste, loose reflective media, and by-products generated by the surface preparation and application operations to the satisfaction of the RPR. The Contractor shall dispose of these wastes in strict compliance with all applicable state, local, and federal environmental statutes and regulations. METHOD OF MEASUREMENT 620-4.1 The quantity of surface preparation shall not be measured for separate payment as it shall be considered subsidiary to the quantity of pavement marking. No separate pay. 620-4.2 The quantity of markings shall be measured by the number of square feet of painting. 620-4.3 The quantity of reflective media shall not be paid for separately as it shall be considered subsidiary to the quantity of pay item Reflective Airfield Pavement Markings. No separate pay. 620-4.4 Retroreflectivity testing of markings shall be subsidiary to other marking pay items. BASIS OF PAYMENT 620-5.1 This price shall be full compensation for furnishing all materials and for all labor, equipment, tools, and incidentals necessary to complete the item complete in place and accepted by the RPR in accordance with these specifications. 620-5.2 Payment for markings shall be made at the contract price by the number of square feet of painting. 620-5.3 Payment for reflective media shall be subsidiary to Reflective Airfield Pavement Markings. 620-5.4 Payment for retroreflectivity testing shall not be paid for separately as it shall be considered subsidiary to the Pavement Marking pay items. Payment will be made under: Item P-620-5.1 Reflective Airfield Pavement Marking - per square foot Item P-620-5.2 Non-Reflective Airfield Pavement Marking—per square foot REFERENCES City Project No: 26122 Issue For Bids P-620-4 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. ASTM International (ASTM) ASTM D476 Standard Classification for Dry Pigmentary Titanium Dioxide Products ASTM D968 Standard Test Methods for Abrasion Resistance of Organic Coatings by Falling Abrasive ASTM D1652 Standard Test Method for Epoxy Content of Epoxy Resins ASTM D2074 Standard Test Method for Total, Primary, Secondary, and Tertiary Amine Values of Fatty Amines by Alternative Indicator Method ASTM D2240 Standard Test Method for Rubber Property- Durometer Hardness ASTM D7585 Standard Practice for Evaluating Retroreflective Pavement Markings Using Portable Hand-Operated Instruments ASTM E303 Standard Test Method for Measuring Surface Frictional Properties Using the British Pendulum Tester ASTM E1710 Standard Test Method for Measurement of Retroreflective Pavement Marking Materials with CEN-Prescribed Geometry Using a Portable Retroreflectometer ASTM E2302 Standard Test Method for Measurement of the Luminance Coefficient Under Diffuse Illumination of Pavement Marking Materials Using a Portable Reflectometer ASTM G154 Standard Practice for Operating Fluorescent Ultraviolet (UV) Lamp Apparatus for Exposure of Nonmetallic Materials Code of Federal Regulations (CFR) 40 CFR Part 60, Appendix A-7, Method 24 Determination of volatile matter content, water content, density, volume solids, and weight solids of surface coatings 29 CFR Part 1910.1200 Hazard Communication Federal Specifications (FED SPEC) FED SPEC TT-B-1325DBeads (Glass Spheres) Retro-Reflective FED SPEC TT-P-1952F Paint, Traffic and Airfield Marking, Waterborne FED STD 595 Colors used in Government Procurement Commercial Item Description A-A-2886B Paint, Traffic, Solvent Based Advisory Circulars (AC) AC 150/5340-1 Standards for Airport Markings AC 150/5320-12 Measurement, Construction, and Maintenance of Skid Resistant Airport Pavement Surfaces END OF ITEM P-620 City Project No: 26122 Issue For Bids P-620-5 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY LEFT BLANK City Project No: 26122 Issue For Bids P-620-6 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 ITEM T-901 SEEDING DESCRIPTION 901-1.1 This item shall consist of soil preparation, seeding, fertilizing, and mulching with tackifier (hydroseeing) the areas shown on the plans or as directed by the RPR in accordance with these specifications. MATERIALS 901-2.1 Seed. The species and application rates of grass, legume, and cover-crop seed furnished shall be those stipulated herein. Seed shall conform to the requirements of Federal Specification JJJ-S-181, Federal Specification, Seeds, Agricultural. Seed shall be furnished separately or in mixtures in standard containers labeled in conformance with the Agricultural Marketing Service (AMS) Seed Act and applicable state seed laws with the seed name, lot number, net weight, percentages of purity and of germination and hard seed, and percentage of maximum weed seed content clearly marked for each kind of seed. The Contractor shall furnish the Engineer Rr RR duplicate signed copies of a statement by the vendor certifying that each lot of seed has been tested by a recognized laboratory for seed testing within six(6) months of date of delivery.This statement shall include: name and address of laboratory, date of test, lot number for each kind of seed, and the results of tests as to name, percentages of purity and of germination, and percentage of weed content for each kind of seed furnished,and, in case of a mixture,the proportions of each kind of seed.Wet, moldy,or otherwise damaged seed will be rejected. Seeds shall be applied as specified in the Texas Department of Transportation Standard Specifications for Construction and Maintenance of Highways, Streets and Bridges, Item 164 Table 2 for the Corpus Christi District follows: Seed Dreneriies and Cade of Annlircatien Se,,e,,d�,, Minimum Seed Purity Minimum Germination CClt . f Seeding shall be per-formed during the periGd between [==] and unless etheRN'se appreyed by the RPR ' 901-2.2 Lime. Not Used 901-2.3 Fertilizer. Fertilizer shall be standard commercial fertilizers supplied separately or in mixtures containing the percentages of total nitrogen, available phosphoric acid, and water-soluble potash. They shall be applied at the rate and to the depth specified, and shall meet the requirements of applicable state laws. They shall be furnished in standard containers with name, weight, and guaranteed analysis of contents clearly marked thereon. No cyanamide compounds or hydrated lime shall be permitted in mixed fertilizers. The fertilizers may be supplied in one of the following forms: a. A dry, free-flowing fertilizer suitable for application by a common fertilizer spreader; b. A finely-ground fertilizer soluble in water, suitable for application by power sprayers; or c. A granular or pellet form suitable for application by blower equipment. City Project No: 26122 Issue For Bids T-901-1 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Fertilizers shall be 10-20-10 commercial fertilizer and shall be spread at the rate of 600 Ibs/acre. Contractor can utilize another commercial fertilizer and apply at a rate equal to at least 60 Ibs of nitrogen per acre. 901-2.4 Soil for repairs. The soil for fill and topsoiling of areas to be repaired shall be at least of equal quality to that which exists in areas adjacent to the area to be repaired.The soil shall be relatively free from large stones, roots, stumps, or other materials that will interfere with subsequent sowing of seed, compacting, and establishing turf, and shall be approved by the Engineer RJR before being placed. 901-2.5 Manufactured mulch for use in Hydro-Seeding(Wet Applied Method). Cellulose-fiber or wood- pulp mulch shall be products commercially available for use in spray applications. 901-2.6 Tackifier. Contractor shall use a commercial tackifier within the hydro-seed mixture. Tackifier shall be submitted for approval along with mulch and other hydro-seed materials. CONSTRUCTION METHODS 901-3.1 Advance preparation and cleanup. After grading of areas has been completed and before applying fertilizer and ground limestone, areas to be seeded shall be raked or otherwise cleared of stones larger than 2 inches (50 mm) in any diameter, sticks, stumps, and other debris that might interfere with sowing of seed, growth of grasses, or subsequent maintenance of grass-covered areas. If any damage by erosion or other causes has occurred after the completion of grading and before beginning the application of fertilizer and ground limestone,the Contractor shall repair such damage include filling gullies, smoothing irregularities, and repairing other incidental damage. An area to be seeded shall be considered a satisfactory seedbed without additional treatment if it has recently been thoroughly loosened and worked to a depth of not less than 5 inches (125 mm)as a result of grading operations and, if immediately prior to seeding, the top 3 inches (75 mm) of soil is loose, friable, reasonably free from large clods, rocks, large roots, or other undesirable matter, and if shaped to the required grade. When the area to be seeded is sparsely sodded, weedy, barren and unworked, or packed and hard, any grass and weeds shall first be cut or otherwise satisfactorily disposed of, and the soil then scarified or otherwise loosened to a depth not less than 5 inches (125 mm). Clods shall be broken and the top 3 inches (75 mm) of soil shall be worked into a satisfactory seedbed by discing, or by use of cultipackers, rollers, drags, harrows, or other appropriate means. 901-3.2 Dry application method. Not Used a. Liming. [ Lome shall be applied separately and prier te the appliGatien ef aRY fertilizer er seed and only on seedbeds that have previously been prepared as deSGribed above. The lime shall then be worked 0 nte the top 3 inGhes (75 mm) ef semi after vihir--h the Seed-bed shall again be prE)perly graded and dressed to a sm,eeth fi;ish.]Net required. b. Fertilizing. Following advanGe preparatiens and Gleanup fertilizer shall be uniformly spread at the rate that will ffevide not less than the rninimum quantity stated in paragraph 901 2.3. r�—N t Fegquired. ] e. Seeding. GFass seed shall be sown at the Fate specified on paFagraph 901 2.1 immediately after feFtilizing. The feFtilizeF and seed shall be Faked within the depth range stated in the special provisiens. Seeds of legurnes, either alone or on MiXtWes, shall be inoeulated befE)Fe mixing OF sowing, On accordance with the instructions of the rnanufaetureF Of the Onooulant. When seeding is reqUiFed at otheF than the seasons shown on the plans OF in the speGial provisions, a coveF GFOP shall be sown by the same methods d. Rolling. After the seed has been PFOPedy GOVered, the seedbed shall be immediately GempaGted by means ef aR appreved lawn reller, weighing 40 te 65 peunds per feet (60 to 97 kg per meter) ef width fer City Project No: 26122 Issue For Bids T-901-2 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Glay seil (er aRY son! having a tendenGy to pack), and weighiRg 150 to 200 pounds per feet (223 to 298 kg per motor) of width for sandy or light &o4s 901-3.3 Wet application method. a. General. The Contractor may elect to apply seed and fertilizer (and lime, if required) by spraying them on the previously prepared seedbed in the form of an aqueous mixture and by using the methods and equipment described herein. The rates of application shall be as specified in the special provisions. b. Spraying equipment. The spraying equipment shall have a container or water tank equipped with a liquid level gauge calibrated to read in increments not larger than 50 gallons (190 liters) over the entire range of the tank capacity, mounted so as to be visible to the nozzle operator. The container or tank shall also be equipped with a mechanical power-driven agitator capable of keeping all the solids in the mixture in complete suspension at all times until used. The unit shall also be equipped with a pressure pump capable of delivering 100 gallons (380 liters) per minute at a pressure of 100 lb/sq inches(690 kPa). The pump shall be mounted in a line that will recirculate the mixture through the tank whenever it is not being sprayed from the nozzle. All pump passages and pipe lines shall be capable of providing clearance for 5/8 inch (16 mm)solids. The power unit for the pump and agitator shall have controls mounted so as to be accessible to the nozzle operator. There shall be an indicating pressure gauge connected and mounted immediately at the back of the nozzle. The nozzle pipe shall be mounted on an elevated supporting stand in such a manner that it can be rotated through 360 degrees horizontally and inclined vertically from at least 20 degrees below to at least 60 degrees above the horizontal. There shall be a quick-acting, three-way control valve connecting the recirculating line to the nozzle pipe and mounted so that the nozzle operator can control and regulate the amount of flow of mixture delivered to the nozzle. At least three different types of nozzles shall be supplied so that mixtures may be properly sprayed over distance varying from 20 to 100 feet(6 to 30 m). One shall be a close-range ribbon nozzle, one a medium-range ribbon nozzle, and one a long-range jet nozzle. For case of removal and cleaning, all nozzles shall be connected to the nozzle pipe by means of quick-release couplings. In order to reach areas inaccessible to the regular equipment, an extension hose at least 50 feet (15 m) in length shall be provided to which the nozzles may be connected. c. Mixtures. Lime, if required,shall be applied separately, in the quantity specified, prior to the fertilizing and seeding operations. Not more than 220 pounds (100 kg)of lime shall be added to and mixed with each 100 gallons (380 liters) of water. Seed and fertilizer shall be mixed together in the relative proportions specified, but not more than a total of 220 pounds (100 kg)of these combined solids shall be added to and mixed with each 100 gallons (380 liters) of water. All water used shall be obtained from fresh water sources and shall be free from injurious chemicals and other toxic substances harmful to plant life. The Contractor shall identify to the Engineer all sources of water at least two (2)weeks prior to use. The EngineerRP—F may take samples of the water at the source or from the tank at any time and have a laboratory test the samples for chemical and saline content. The Contractor shall not use any water from any source that is disapproved the ERR following such tests. All mixtures shall be constantly agitated from the time they are mixed until they are finally applied to the seedbed. All such mixtures shall be used within two (2) hours from the time they were mixed or they shall be wasted and disposed of at approved locations. d. Spraying. Lime, if required, shall be sprayed only upon previously prepared seedbeds. After the applied lime mixture has dried, the lime shall be worked into the top 3 inches (75 mm), after which the seedbed shall again be properly graded and dressed to a smooth finish. Mixtures of seed and fertilizer shall only be sprayed upon previously prepared seedbeds on which the lime, if required, shall already have been worked in. The mixtures shall be applied by means of a high- City Project No: 26122 Issue For Bids T-901-3 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 pressure spray that shall always be directed upward into the air so that the mixtures will fall to the ground like rain in a uniform spray. Nozzles or sprays shall never be directed toward the ground in such a manner as might produce erosion or runoff. Particular care shall be exercised to ensure that the application is made uniformly and at the prescribed rate and to guard against misses and overlapped areas. Proper predetermined quantities of the mixture in accordance with specifications shall be used to cover specified sections of known area. Checks on the rate and uniformity of application may be made by observing the degree of wetting of the ground or by distributing test sheets of paper or pans over the area at intervals and observing the quantity of material deposited thereon. On surfaces that are to be mulched as indicated by the plans or designated by the Engineer RJR, seed and fertilizer applied by the spray method need not be raked into the soil or rolled. However, on surfaces on which mulch is not to be used, the raking and rolling operations will be required after the soil has dried. 901-3.4 Maintenance of seeded areas. The Contractor shall protect seeded areas against traffic or other use by warning signs or barricades, as approved by the RPR. Surfaces gullied or otherwise damaged following seeding shall be repaired by regrading and reseeding as directed. The Contractor shall mow, water as directed, and otherwise maintain seeded areas in a satisfactory condition until final inspection and acceptance of the work. When either the dry or wet application method outlined above is used for work done out of season, it will be required that the Contractor establish a good stand of grass of uniform color and density to the satmsfaGtO R of the RPR. A grass stand shall be considered adequate when bare spots are one square foot (0.01 sq m)or less, randomly dispersed, and do not exceed 3% of the area seeded. METHOD OF MEASUREMENT 901-4.1 The quantity of seeding to be paid for shall be the number of units acre measured on the ground surface, completed and accepted. Seeding shall be measured to the nearest tenth (0.1) of an acre. Lime and fertilizer will not be measured for separate payment but will be considered subsidiary to seeding. BASIS OF PAYMENT 901-5.1 Payment shall be made at the contract unit price per acre or fraction thereof, which price and payment shall be full compensation for furnishing and placing all material and for all labor, equipment, tools, and incidentals necessary to complete the work prescribed in this item. Payment will be made under: Item T-901-5.1 Seeding - per acre REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. ASTM International (ASTM) ASTM C602 Standard Specification for Agricultural Liming Materials Federal Specifications (FED SPEC) FED SPEC JJJ-S-181, Federal Specification, Seeds, Agricultural Advisory Circulars (AC) AC 150/5200-33 Hazardous Wildlife Attractants on or Near Airports City Project No: 26122 Issue For Bids T-901-4 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 FAA/United States Department of Agriculture Wildlife Hazard Management at Airports, A Manual for Airport Personnel END OF ITEM T-901 City Project No: 26122 Issue For Bids T-901-5 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY LEFT BLANK City Project No: 26122 Issue For Bids T-901-6 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 ITEM T-904 SODDING DESCRIPTION 904-1.1 This item shall consist of furnishing, hauling, and placing approved live sod on prepared areas in accordance with this specification at the locations shown on the plans or as directed by the RPR. MATERIALS 904-2.1 Sod. Sod furnished by the Contractor shall have a good cover of living or growing grass. This shall be interpreted to include grass that is seasonally dormant during the cold or dry seasons and capable of renewing growth after the dormant period.All sod shall be obtained from areas where the soil is reasonably fertile and contains a high percentage of loamy topsoil. Sod shall be cut or stripped from living, thickly matted turf relatively free of weeds or other undesirable foreign plants, large stones, roots,or other materials that might be detrimental to the development of the sod or to future maintenance. Sod for this project shall be accompanied by a certification from the sod supplier stating the sod is healthy, free of disease, and noxious weeds or other grasses which might be detrimental to its growth. At least 70% of the plants in the cut sod shall be composed of Bermudagrass the spesfes stated On the special previsiens, and any vegetation more than 6 inches in height shall be mowed to a height of 3 inches or less before sod is lifted. Sod, including the soil containing the roots and the plant growth showing above, shall be cut uniformly to a thickness not less than that stated in the special provisions. 904-2.2 Lime. Not required. 904-2.3 Fertilizer. Fertilizer shall be standard commercial fertilizers supplied separately or in mixtures containing the percentages of total nitrogen, available phosphoric acid, and water-soluble potash. They shall be applied at the rate and to the depth specified, and shall meet the requirements of applicable state laws. They shall be furnished in standard containers with name, weight, and guaranteed analysis of contents clearly marked thereon. No cyanamide compounds or hydrated lime shall be permitted in mixed fertilizers. The fertilizers may be supplied in one of the following forms: a. A dry, free-flowing fertilizer suitable for application by a common fertilizer spreader; b. A finely-ground fertilizer soluble in water, suitable for application by power sprayers; or c. A granular or pellet form suitable for application by blower equipment. Fertilizers shall be 10-20-10 commercial fertilizer and shall be spread at the rate of 800 Ibs/acre. 904-2.4 Water. The water shall be sufficiently free from oil, acid, alkali, salt, or other harmful materials that would inhibit the growth of grass. 904-2.5 Soil for repairs. The soil for fill and topsoiling of areas to be repaired shall be at least of equal quality to that which exists in areas adjacent to the area to be repaired.The soil shall be relatively free from large stones, roots, stumps, or other materials that will interfere with subsequent sowing of seed, compacting, and establishing turf, and shall be approved by the RPR before being placed. CONSTRUCTION METHODS 904-3.1 General. Areas to be solid, strip, or spot sodded shall be shown on the plans. Areas requiring special ground surface preparation such as tilling and those areas in a satisfactory condition that are to remain undisturbed shall also be shown on the plans. Suitable equipment necessary for proper preparation of the ground surface and for the handling and placing of all required materials shall be on hand, in good condition, and shall be approved by the RPR before the various operations are started. The Contractor shall demonstrate to the RPR before starting the various operations that the application of required materials will be made at the specified rates. City Project No: 26122 Issue For Bids T-904-1 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 904-3.2 Preparing the ground surface. After grading of areas has been completed and before applying fertilizer and limestone, areas to be sodded shall be raked or otherwise cleared of stones larger than 2 inches in any diameter, sticks, stumps, and other debris which might interfere with sodding, growth of grasses, or subsequent maintenance of grass-covered areas. If any damage by erosion or other causes occurs after grading of areas and before beginning the application of fertilizer and ground limestone, the Contractor shall repair such damage.This may include filling gullies, smoothing irregularities, and repairing other incidental damage. 904-3.3 Applying fertilizer and ground limestone. Following ground surface preparation, fertilizer shall be uniformly spread at a rate which will provide not less than the minimum quantity of each fertilizer ingredient, as stated in the special provisions. If use of ground limestone is required, it shall then be spread at a rate that will provide not less than the minimum quantity stated in the special provisions. These materials shall be incorporated into the soil to a depth of not less than 2 inches by discing, raking, or other suitable methods. Any stones larger than 2 inches in any diameter, large clods, roots, and other litter brought to the surface by this operation shall be removed. 904-3.4 Obtaining and delivering sod. After inspection and approval of the source of sod by the RPR, the sod shall be cut with approved sod cutters to such a thickness that after it has been transported and placed on the prepared bed, but before it has been compacted, it shall have a uniform thickness of not less than 2 inches. Sod sections or strips shall be cut in uniform widths, not less than 10 inches, and in lengths of not less than 18 inches, but of such length as may be readily lifted without breaking, tearing, or loss of soil. Where strips are required, the sod must be rolled without damage with the grass folded inside. The Contractor may be required to mow high grass before cutting sod. The sod shall be transplanted within 24 hours from the time it is stripped, unless circumstances beyond the Contractor's control make storing necessary. In such cases,sod shall be stacked, kept moist, and protected from exposure to the air and sun and shall be kept from freezing. Sod shall be cut and moved only when the soil moisture conditions are such that favorable results can be expected. Where the soil is too dry, approval to cut sod may be granted only after it has been watered sufficiently to moisten the soil to the depth the sod is to be cut. 904-3.5 Laying sod. Sodding shall be performed only during the seasons when satisfactory results can be expected. Frozen sod shall not be used and sod shall not be placed upon frozen soil. Sod may be transplanted during periods of drought with the approval of the RPR, provided the sod bed is watered to moisten the soil to a depth of at least 4 inches immediately prior to laying the sod. The sod shall be moist and shall be placed on a moist earth bed. Pitch forks shall not be used to handle sod, and dumping from vehicles shall not be permitted. The sod shall be carefully placed by hand, edge to edge and with staggered joints, in rows at right angles to the slopes, commencing at the base of the area to be sodded and working upward. The sod shall immediately be pressed firmly into contact with the sod bed by tamping or rolling with approved equipment to provide a true and even surface, and ensure knitting without displacement of the sod or deformation of the surfaces of sodded areas. Where the sod may be displaced during sodding operations, the workmen, when replacing it, shall work from ladders or treaded planks to prevent further displacement. Screened soil of good quality shall be used to fill all cracks between sods. The quantity of the fill soil shall not cause smothering of the grass. Where the grades are such that the flow of water will be from paved surfaces across sodded areas, the surface of the soil in the sod after compaction shall be set approximately one inch below the pavement edge. Where the flow will be over the sodded areas and onto the paved surfaces around manholes and inlets, the surface of the soil in the sod after compaction shall be placed flush with pavement edges. On slopes steeper than one (1)vertical to 2-1/2 horizontal and in v-shaped or flat-bottom ditches or gutters, the sod shall be pegged with wooden pegs not less than 12 inches in length and have a cross-sectional area of not less than 3/4 sq inch. The pegs shall be driven flush with the surface of the sod. 904-3.6 Watering. Adequate water and watering equipment must be on hand before sodding begins, and sod shall be kept moist until it has become established and its continued growth assured. In all cases, watering shall be done in a manner that will avoid erosion from the application of excessive quantities and will avoid damage to the finished surface. City Project No: 26122 Issue For Bids T-904-2 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 904-3.7 Establishing turf. The Contractor shall provide general care for the sodded areas as soon as the sod has been laid and shall continue until final inspection and acceptance of the work. All sodded areas shall be protected against traffic or other use by warning signs or barricades approved by the RPR. The Contractor shall mow the sodded areas with approved mowing equipment, depending upon climatic and growth conditions and the needs for mowing specific areas. Weeds or other undesirable vegetation shall be mowed and the clippings raked and removed from the area. 904-3.8 Repairing.When the surface has become gullied or otherwise damaged during the period covered by this contract, the affected areas shall be repaired to re-establish the grade and the condition of the soil, as directed by the RPR, and shall then be sodded as specified in paragraph 904-3.5. METHOD OF MEASUREMENT 904-4.1 This item shall not be measured for separate payment. BASIS OF PAYMENT 904-5.1 This item will not be paid separately but shall be considered subsidiary to ditch grading payment items. REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. ASTM International (ASTM) ASTM C602 Standard Specification for Agricultural Liming Materials Advisory Circulars (AC) AC 150/5200-33 Hazardous Wildlife Attractants on or Near Airports FAA/United States Department of Agriculture Wildlife Hazard Management at Airports, A Manual for Airport Personnel END OF ITEM T-904 City Project No: 26122 Issue For Bids T-904-3 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY LEFT BLANK City Project No: 26122 Issue For Bids T-904-4 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 ITEM T-905 TOPSOIL DESCRIPTION 905-1.1 This item shall consist of preparing the ground surface for topsoil application, removing topsoil from designated stockpiles or areas to be stripped on the site or from approved sources off the site, and placing and spreading the topsoil on prepared areas in accordance with this specification at the locations shown on the plans or as directed by the RPR. MATERIALS 905-2.1 Topsoil. Topsoil shall be the surface layer of soil with no admixture of refuse or any material toxic to plant growth, and it shall be reasonably free from subsoil and stumps, roots, brush, stones (2 inches) or more in diameter),and clay lumps or similar objects. Brush and other vegetation that will not be incorporated with the soil during handling operations shall be cut and removed. Ordinary sod and herbaceous growth such as grass and weeds are not to be removed, but shall be thoroughly broken up and intermixed with the soil during handling operations. Heavy sod or other cover, which cannot be incorporated into the topsoil by discing or other means, shall be removed. The topsoil or soil mixture, unless otherwise specified or approved, shall have a pH range of approximately 5.5 pH to 7.6 pH, when tested in accordance with the methods of testing of the Association of Official Agricultural Chemists in effect on the date of invitation of bids. The organic content shall be not less than 3% nor more than 20% as determined by the wet- combustion method (chromic acid reduction). There shall be not less than 20% nor more than 80% of the material passing the 200 mesh (75 pm) sieve as determined by the wash test in accordance with ASTM C117. Topsoil testing shall be completed and paid for by the Contractor. Natural topsoil may be amended by the Contractor with approved materials and methods to meet the above specifications. 905-2.2 Inspection and tests. Within 10 days following acceptance of the bid, the RPR shall be notified of the source of topsoil to be furnished by the Contractor. The topsoil shall be inspected to determine if the selected soil meets the requirements specified and to determine the depth to which stripping will be permitted. At this time, the Contractor may be required to take representative soil samples from several locations within the area under consideration and to the proposed stripping depths, for testing purposes as specified in paragraph 905-2.1. CONSTRUCTION METHODS 905-3.1 General. Areas to be topsoiled shall be shown on the plans. If topsoil is available on the site, the location of the stockpiles or areas to be stripped of topsoil and the stripping depths shall be shown on the plans. Suitable equipment necessary for proper preparation and treatment of the ground surface, stripping of topsoil, and for the handling and placing of all required materials shall be on hand, in good condition, and approved by the RPR before the various operations are started. 905-3.2 Preparing the ground surface. Immediately prior to dumping and spreading the topsoil on any area, the surface shall be loosened by discs or spike-tooth harrows, or by other means approved by the RPR, to a minimum depth of 2 inches to facilitate bonding of the topsoil to the covered subgrade soil. The surface of the area to be topsoiled shall be cleared of all stones larger than 2 inches in any diameter and all litter or other material which may be detrimental to proper bonding, the rise of capillary moisture, or the proper growth of the desired planting. Limited areas, as shown on the plans, which are too compact to respond to these operations shall receive special scarification. Grades on the area to be topsoiled, which have been established by others as shown on the plans, shall be maintained in a true and even condition. Where grades have not been established, the areas shall be smooth-graded and the surface left at the prescribed grades in an even and compacted condition to prevent the formation of low places or pockets where water will stand. City Project No: 26122 Issue For Bids T-905-1 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 905-3.3 Obtaining topsoil. Prior to the stripping of topsoil from designated areas, any vegetation, briars, stumps and large roots, rubbish or stones found on such areas, which may interfere with subsequent operations, shall be removed using methods approved by the RPR. Heavy sod or other cover,which cannot be incorporated into the topsoil by discing or other means shall be removed. When suitable topsoil is available on the site, the Contractor shall remove this material from the designated areas and to the depth as directed by the RPR. The topsoil shall be spread on areas already tilled and smooth-graded, or stockpiled in areas approved by the RPR. Any topsoil stockpiled by the Contractor shall be rehandled and placed without additional compensation. Any topsoil that has been stockpiled on the site by others, and is required for topsoil purposes, shall be removed and placed by the Contractor. The sites of all stockpiles and areas adjacent thereto which have been disturbed by the Contractor shall be graded if required and put into a condition acceptable for seeding. When suitable topsoil is secured off the airport site, the Contractor shall locate and obtain the supply, subject to the approval of the RPR.The Contractor shall notify the RPR sufficiently in advance of operations in order that necessary measurements and tests can be made. The Contractor shall remove the topsoil from approved areas and to the depth as directed. The topsoil shall be hauled to the site of the work and placed for spreading, or spread as required. Any topsoil hauled to the site of the work and stockpiled shall be rehandled and placed without additional compensation. 905-3.4 Placing topsoil. The topsoil shall be evenly spread on the prepared areas to a uniform depth of 2 inches after compaction, unless otherwise shown on the plans or stated in the special provisions. Spreading shall not be done when the ground or topsoil is frozen, excessively wet, or otherwise in a condition detrimental to the work. Spreading shall be carried on so that turfing operations can proceed with a minimum of soil preparation or tilling. After spreading, any large, stiff clods and hard lumps shall be broken with a pulverizer or by other effective means, and all stones or rocks (2 inches or more in diameter), roots, litter, or any foreign matter shall be raked up and disposed of by the Contractor. after spreading is completed, the topsoil shall be satisfactorily compacted by rolling with a cultipacker or by other means approved by the RPR. The compacted topsoil surface shall conform to the required lines, grades, and cross-sections. Any topsoil or other dirt falling upon pavements as a result of hauling or handling of topsoil shall be promptly removed. METHOD OF MEASUREMENT 905-4.1 Topsoil obtained on the site shall not be measured for separate payment but shall be incidental to the item in which it is contained. by the. mbar Gf biG yards of tepseil measured in its eriginal p sitien measured by the number Of GubiG yards of topseil measured On the StC)Gkpile. Topseil shall be measured by vel imo in euhin yards ^emni ited by the mother- of end areas 905-4.2 Topsoil obtained off the site shall not be measured for separate payment but shall be incidental to the item in which it is contained. her the number of G biG Yards Of tenceil measured in its original nesitien Topsoil shall be me-a-sured by vGlyrne on GybiG yards GOmputed by the Methed of en -..rn�Rd areas . BASIS OF PAYMENT 905-5.1 Payment will he made at the eontract unit PFice per ,.hie yaFd for topsoil (obtained on the site)shall be incidental to the item in which it is contained, including .. This shall be f„ll ^empensatier far furnishing all materials and for all preparation, placing, and spreading of the materials, and for all labor, equipment, tools, and incidentals necessary to complete the item. 905-5.2 Payment will he made at the eontract unit PFice per cubic.,err-for topsoil (obtained off the site)shall be incidental to the item in which it is contained, including. This shall be full compensation far furnishing all materials and for all preparation, placing, and spreading of the materials, and for all labor, equipment, tools, and incidentals necessary to complete the item. City Project No: 26122 Issue For Bids T-905-2 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Payment will be made under: item T-905-6.1 Topsoil (Obtained on Site or Removed from Stockpile)- PeF GubiG yard item T 905 5.2 Topsoil (Furnished from Off the Site)perEmbie yard REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. ASTM International (ASTM) ASTM C117 Materials Finer than 75 µm (No. 200) Sieve in Mineral Aggregates by Washing Advisory Circulars (AC) AC 150/5200-33 Hazardous Wildlife Attractants on or Near Airports FAA/United States Department of Agriculture Wildlife Hazard Management at Airports, A Manual for Airport Personnel END OF ITEM T-905 City Project No: 26122 Issue For Bids T-905-3 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY LEFT BLANK City Project No: 26122 Issue For Bids T-905-4 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 ITEM L-108 UNDERGROUND POWER CABLE FOR AIRPORTS DESCRIPTION 108-1.1 This item shall consist of furnishing and installing power cables that are direct buried and furnishing and/or installing power cables within conduit or duct banks per these specifications at the locations shown on the plans. It includes excavation and backfill of trench for direct-buried cables only. Also included are the installation of counterpoise wires, ground wires, ground rods and connections, cable splicing, cable marking, cable testing, and all incidentals necessary to place the cable in operating condition as a completed unit to the satisfaction of the RPR. This item shall not include the installation of duct banks or conduit, trenching and backfilling for duct banks or conduit, or furnishing or installation of cable for FAA owned/operated facilities. EQUIPMENT AND MATERIALS 108-2.1 General. a. Airport lighting equipment and materials covered by advisory circulars (AC)shall be approved under the Airport Lighting Equipment Certification Program per AC 150/5345-53, current version. b. All other equipment and materials covered by other referenced specifications shall be subject to acceptance through manufacturer's certification of compliance with the applicable specification, when requested by the RPR. c. Manufacturer's certifications shall not relieve the Contractor of the responsibility to provide materials per these specifications. Materials supplied and/or installed that do not comply with these specifications shall be removed (when directed by the RPR) and replaced with materials that comply with these specifications at the Contractor's cost. d. All materials and equipment used to construct this item shall be submitted to the RPR for approval prior to ordering the equipment. Submittals consisting of marked catalog sheets or shop drawings shall be provided. Submittal data shall be presented in a clear, precise and thorough manner. Original catalog sheets are preferred. Photocopies are acceptable provided they are as good a quality as the original. Clearly and boldly mark each copy to identify products or models applicable to this project. Indicate all optional equipment and delete any non-pertinent data. Submittals for components of electrical equipment and systems shall identify the equipment to which they apply on each submittal sheet. Markings shall be made bold and clear with arrows or circles (highlighting is not acceptable). The Contractor is solely responsible for delays in the project that may accrue directly or indirectly from late submissions or resubmissions of submittals. e. The data submitted shall be sufficient, in the opinion of the RPR, to determine compliance with the plans and specifications. The Contractor's submittals shall be submitted in pdf format, tabbed by specification section. The RPR reserves the right to reject any and all equipment, materials, or procedures that do not meet the system design and the standards and codes, specified in this document. f. All equipment and materials furnished and installed under this section shall be guaranteed against defects in materials and workmanship for at least twelve (12) months from the date of final acceptance by the Owner. The defective materials and/or equipment shall be repaired or replaced, at the Owner's discretion, with no additional cost to the Owner. The Contractor shall maintain a minimum insulation resistance in accordance with paragraph 108-3.10e with isolation transformers connected in new circuits and new segments of existing circuits through the end of the contract warranty period when tested in accordance with AC 150/5340-26, Maintenance Airport Visual Aid Facilities, paragraph 5.1.3.1, Insulation Resistance Test. 108-2.2 Cable. Underground cable for airfield lighting facilities (runway and taxiway lights and signs) shall conform to the requirements of AC 150/5345-7, Specification for L-824 Underground Electrical Cable for Airport Lighting Circuits latest edition. Conductors for use on 6.6 ampere primary airfield lighting series circuits shall be single conductor, seven strand,#8 American wire gauge(AWG), L-824 Type C, 5,000 volts, City Project No: 26122 Issue For Bids L-108-1 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 non-shielded, with cross-linked polyethylene insulation. G RduGt„rs for, n 20 ampere primary airfield lighting series GirGuits shall be single GonduGtor, seveR strand, #6 AWG, L-824 [Type 13][Type G1, 5,000 volts, non shielded, with [ethylene propylene linked polyethylene insulation]. L-824 conductors for use on the L-830 secondary of airfield lighting series circuits shall be sized in accordance with the manufacturer's recommendations. All other conductors shall comply with FAA and National Electric Code (NEC) requirements. Conductor sizes noted above shall not apply to leads furnished by manufacturers on airfield lighting transformers and fixtures. Wire for electrical circuits up to 600 volts shall comply with Specification L-824 and/or Commercial Item Description A-A-59544A and shall be type THWN-2, 75°C for installation in conduit and RHW-2, 75°C for direct burial installations. Conductors for parallel (voltage) circuits shall be type and size and installed in accordance with NFPA-70, National Electrical Code. Unless noted otherwise, all 600-volt and less non-airfield lighting conductor sizes are based on a 75°C, THWN-2, 600-volt insulation, copper conductors, not more than three single insulated conductors, in raceway, in free air. The conduit/duct sizes are based on the use of THWN-2, 600-volt insulated conductors. The Contractor shall make the necessary increase in conduit/duct sizes for other types of wire insulation. In no case shall the conduit/duct size be reduced. The minimum power circuit wire size shall be#12 AWG. Conductor sizes may have been adjusted due to voltage drop or other engineering considerations. Equipment provided by the Contractor shall be capable of accepting the quantity and sizes of conductors shown in the Contract Documents. All conductors, pigtails, cable step-down adapters, cable step-up adapters, terminal blocks and splicing materials necessary to complete the cable termination/splice shall be considered incidental to the respective pay items provided. Cable type, size, number of conductors, strand and service voltage shall be as specified in the Contract Document. 108-2.3 Bare copper wire (counterpoise, bare copper wire ground and ground rods). Wire for counterpoise or ground installations for airfield lighting systems shall be No. 6 AWG bare solid copper wire for counterpoise and/or No. 6 AWG insulated stranded for grounding bond wire per ASTM B3 and ASTM B8, and shall be bare copper wire. For voltage powered circuits, the equipment grounding conductor shall comply with NEC Article 250. Ground rods shall be copper-clad steel. The ground rods shall be of the length and diameter specified on the plans, but in no case be less than 10 feet] long and 3/4 inch in diameter. 108-2.4 Cable connections. In-line connections or splices of underground primary cables shall be of the type called for on the plans, and shall be one of the types listed below. No separate payment will be made for cable connections. a. The cast splice. A cast splice, employing a plastic mold and using epoxy resin equivalent to that manufactured by 3MTM Company, "Scotchcast" Kit No. 82-B, or an approved equivalent, used for potting the splice is acceptable. b. The field-attached plug-in splice. Field attached plug-in splices shall be installed as shown on the plans. The Contractor shall determine the outside diameter of the cable to be spliced and furnish appropriately sized connector kits and/or adapters. Tape or heat shrink tubing with integral sealant shall be in accordance with the manufacturer's requirements. Primary Connector Kits manufactured by Amerace, "Super Kit", Integro "Complete Kit", or approved equal are acceptable. c. The factory-molded plug-in splice. Specification for L-823 Connectors, Factory-Molded to Individual Conductors, is acceptable. d. The taped or heat-shrink splice. Taped splices employing field-applied rubber, or synthetic rubber tape covered with plastic tape is acceptable.The rubber tape should meet the requirements of ASTM D4388 and the plastic tape should comply with Military Specification MIL-1-24391 or Commercial Item Description City Project No: 26122 Issue For Bids L-108-2 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 A-A-55809. Heat shrinkable tubing shall be heavy-wall, self-sealing tubing rated for the voltage of the wire being spliced and suitable for direct-buried installations. The tubing shall be factory coated with a thermoplastic adhesive-sealant that will adhere to the insulation of the wire being spliced forming a moisture- and dirt-proof seal. Additionally, heat shrinkable tubing for multi-conductor cables, shielded cables,and armored cables shall be factory kits that are designed for the application. Heat shrinkable tubing and tubing kits shall be manufactured by Tyco Electronics/ Raychem Corporation, Energy Division, or approved equivalent. In all the above cases, connections of cable conductors shall be made using crimp connectors using a crimping tool designed to make a complete crimp before the tool can be removed. All L-823/L-824 splices and terminations shall be made per the manufacturer's recommendations and listings. All connections of counterpoise, grounding conductors and ground rods shall be made by the exothermic process or approved equivalent, except that a light base ground clamp connector shall be used for attachment to the light base. All exothermic connections shall be made per the manufacturer's recommendations and listings. 108-2.5 Splicer qualifications. Every airfield lighting cable splicer shall be qualified in making airport cable splices and terminations on cables rated at or above 5,000 volts AC. The Contractor shall submit to the RPR proof of the qualifications of each proposed cable splicer for the airport cable type and voltage level to be worked on. Cable splicing/terminating personnel shall have a minimum of three (3)years continuous experience in terminating/splicing medium voltage cable. 108-2.6 Concrete. Concrete shall be proportioned, placed, and cured per state department of transportation structural concrete with minimum 25%Type F fly ash, and a minimum allowable compressive strength of 4,000 psi. 108-2.7 Flowable backfill. Fl.wable r,,ateFial used to baekfill tFenches for peweF able trenches shall e6rrron-rrt6 the fequ FF2ments of rr 108-2.8 Cable identification tags. Cable identification tags shall be made from a non-corrosive material with the circuit identification stamped or etched onto the tag. The tags shall be of the type as detailed on the plans. 108-2.9 Tape. Electrical tapes shall be ScotchTM Electrical Tapes —ScotchTM 88 (1-1/2 inch wide) and ScotchTM 130C° Iinerless rubber splicing tape (2-inch (50 mm) wide), as manufactured by the Minnesota Mining and Manufacturing Company (3MTM), or an approved equivalent. 108-2.10 Electrical coating. Electrical coating shall be ScotchkoteTm as manufactured by 3MTM, or an approved equivalent. 108-2.11 Existing circuits. Whenever the scope of work requires connection to an existing circuit, the existing circuit's insulation resistance shall be tested, in the presence of the RPR. The test shall be performed per this item and prior to any activity that will affect the respective circuit. The Contractor shall record the results on forms acceptable to the RPR. When the work affecting the circuit is complete, the circuit's insulation resistance shall be checked again, in the presence of the RPR. The Contractor shall record the results on forms acceptable to the RPR. The second reading shall be equal to or greater than the first reading or the Contractor shall make the necessary repairs to the existing circuit to bring the second reading above the first reading. All repair costs including a complete replacement of the L-823 connectors, L-830 transformers and L-824 cable, if necessary, shall be borne by the Contractor. All test results shall be submitted in the Operation and Maintenance (O&M) Manual. 108-2.12 Detectable warning tape. Plastic, detectable, American Public Works Association (APWA) Red (electrical power lines,cables, conduit and lighting cable)with continuous legend tape shall be polyethylene film with a metalized foil core and shall be 3-6 inches wide. Detectable tape is incidental to the respective bid item. Detectable warning tape for communication cables shall be orange. Detectable warning tape color code shall comply with the APWA Uniform Color Code. City Project No: 26122 Issue For Bids L-108-3 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 CONSTRUCTION METHODS 108-3.1 General. The Contractor shall install the specified cable at the approximate locations indicated on the plans. Unless otherwise shown on the plans, all cable required to cross under pavements expected to carry aircraft loads shall be installed in concrete encased duct banks. Cable shall be run without splices, from fixture to fixture. Cable connections between lights will be permitted only at the light locations for connecting the underground cable to the primary leads of the individual isolation transformers. The Contractor shall be responsible for providing cable in continuous lengths for home runs or other long cable runs without connections unless otherwise authorized in writing by the RPR or shown on the plans. In addition to connectors being installed at individual isolation transformers, L-823 cable connectors for maintenance and test points shall be installed at locations shown on the plans. Cable circuit identification markers shall be installed on both sides of the L-823 connectors installed and on both sides of slack loops where a future connector would be installed. Provide not less than 3 feet of cable slack on each side of all connections, isolation transformers, light units, and at points where cable is connected to field equipment. Where provisions must be made for testing or for future above grade connections, provide enough slack to allow the cable to be extended at least one foot vertically above the top of the access structure. This requirement also applies where primary cable passes through empty light bases,junction boxes, and access structures to allow for future connections, or as designated by the RPR. Primary airfield lighting cables installed shall have cable circuit identification markers attached on both sides of each L-823 connector and on each airport lighting cable entering or leaving cable access points, such as manholes, hand holes, pull boxes,junction boxes, etc. Markers shall be of sufficient length for imprinting the cable circuit identification legend on one line, using letters not less than 1/4 inch in size. The cable circuit identification shall match the circuits noted on the construction plans. 108-3.2 Installation in duct banks or conduits. This item includes the installation of the cable in duct banks or conduit per the following paragraphs.The maximum number and voltage ratings of cables installed in each single duct or conduit, and the current-carrying capacity of each cable shall be per the latest version of the National Electric Code, or the code of the local agency or authority having jurisdiction. The Contractor shall make no connections or splices of any kind in cables installed in conduits or duct banks. Unless otherwise designated in the plans,where ducts are in tiers, use the lowest ducts to receive the cable first, with spare ducts left in the upper levels. Check duct routes prior to construction to obtain assurance that the shortest routes are selected and that any potential interference is avoided. Duct banks or conduits shall be installed as a separate item per Item L-110, Airport Underground Electrical Duct Banks and Conduit. The Contractor shall run a mandrel through duct banks or conduit prior to installation of cable to ensure that the duct bank or conduit is open, continuous and clear of debris. The mandrel size shall be compatible with the conduit size. The Contractor shall swab out all conduits/ducts and clean light bases, manholes, etc., interiors immediately prior to pulling cable. Once cleaned and swabbed, the light bases and all accessible points of entry to the duct/conduit system shall be kept closed except when installing cables. Cleaning of ducts, light bases, manholes, etc., is incidental to the pay item of the item being cleaned. All raceway systems left open, after initial cleaning, for any reason shall be re- cleaned at the Contractor's expense. The Contractor shall verify existing ducts proposed for use in this project as clear and open. The Contractor shall notify the RPR of any blockage in the existing ducts. The cable shall be installed in a manner that prevents harmful stretching of the conductor, damage to the insulation, or damage to the outer protective covering. The ends of all cables shall be sealed with moisture- seal tape providing moisture-tight mechanical protection with minimum bulk, or alternately, heat shrinkable tubing before pulling into the conduit and it shall be left sealed until connections are made. Where more than one cable is to be installed in a conduit, all cable shall be pulled in the conduit at the same time. The City Project No: 26122 Issue For Bids L-108-4 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 pulling of a cable through duct banks or conduits may be accomplished by hand winch or power winch with the use of cable grips or pulling eyes. Maximum pulling tensions shall not exceed the cable manufacturer's recommendations. A non-hardening cable-pulling lubricant recommended for the type of cable being installed shall be used where required. The Contractor shall submit the recommended pulling tension values to the RPR prior to any cable installation. If required by the RPR, pulling tension values for cable pulls shall be monitored by a dynamometer in the presence of the RPR. Cable pull tensions shall be recorded by the Contractor and reviewed by the RPR. Cables exceeding the maximum allowable pulling tension values shall be removed and replaced by the Contractor at the Contractor's expense. The manufacturer's minimum bend radius or NEC requirements (whichever is more restrictive)shall apply. Cable installation, handling and storage shall be per manufacturer's recommendations. During cold weather, particular attention shall be paid to the manufacturer's minimum installation temperature. Cable shall not be installed when the temperature is at or below the manufacturer's minimum installation temperature.At the Contractor's option,the Contractor may submit a plan,for review by the RPR,for heated storage of the cable and maintenance of an acceptable cable temperature during installation when temperatures are below the manufacturer's minimum cable installation temperature. Cable shall not be dragged across base can or manhole edges, pavement or earth. When cable must be coiled, lay cable out on a canvas tarp or use other appropriate means to prevent abrasion to the cable jacket. 108-3.3 Installation of direct-buried cable in trenches. Unless eth.,.-,.,ise speGified, the ContFaCt F shall not use a eable PIOW fOF installing the cable. Cable shall be unFeeled unifOFMIY on place alongside OF on the tFench and shall be caFefully placed along the bottom of the tFench. The cable shall not be unFeeled and pulled into the tFench fFOM one end. Slack eable sufficient to PFGVide StFain relief shall be plaoed in the tFeneh in a seFies of S ourves. ShaFp bends OF kinks in the cable shall not be permitted. Where eables must cross ever eaeh otheF, a monomum of 3 inches vertical displaeement shall be PFOVided with the topmost eable depth at or below the minimum requiFed depth below finished grade. a. Trenching. Where turf is well established and the sod can be removed, it shall be carefully stripped and properly stored. Trenches for cables may be excavated manually or with mechanical trenching equipment. Walls of trenches shall be essentially vertical so that a minimum of surface is disturbed. Graders shall not be used to excavate the trench with their blades. The bottom surface of trenches shall be essentially smooth and free from coarse aggregate. Unless otherwise specified, cable trenches shall be excavated to a minimum depth of 18 inches below finished grade per NEC Table 300.5, except as follows: • When off the airport or crossing under a roadway or driveway, the minimum depth shall be 36 inches unless otherwise specified. • Minimum cable depth when crossing under a railroad track, shall be 42 inches unless otherwise specified. The Contractor shall excavate all cable trenches to a width not less than 6 inches. Unless otherwise specified on the plans, all cables in the same location and running in the same general direction shall be installed in the same trench. When rock is encountered, the rock shall be removed to a depth of at least 3 below the required cable depth and it shall be replaced with bedding material of earth or sand containing no mineral aggregate particles that would be retained on a 1/4-inch sieve. Flowable backfill material may alternatively be used. The Contractor shall ascertain the type of soil or rock to be excavated before bidding.All such rock removal shall be performed and paid for under subsidiary to the respective trenching or conduit or duct bank pay item. Duct bank or conduit markers temporarily removed for trench excavations shall be replaced as required. City Project No: 26122 Issue For Bids L-108-5 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 It is the Contractor's responsibility to locate existing utilities within the work area prior to excavation. Where existing active cables cross proposed installations, the Contractor shall ensure that these cables are adequately protected. Where crossings are unavoidable, no splices will be allowed in the existing cables, except as specified on the plans. Installation of new cable where such crossings must occur shall proceed as follows: (1) Existing cables shall be located manually. Unearthed cables shall be inspected to assure absolutely no damage has occurred. (2)Trenching, etc., in cable areas shall then proceed, with approval of the RPR, with care taken to minimize possible damage or disruption of existing cable, including careful backfilling in area of cable. In the event that any previously identified cable is damaged during the course of construction, the Contractor shall be responsible for the complete repair or replacement. b. Backfilling.After the cable has been installed,the trench shall be backfilled. The first layer of backfill in the trench shall encompass all cables; be 3 deep, loose measurement; and shall be either earth or sand containing no mineral aggregate particles that would be retained on a 1/4-inch sieve. This layer shall not be compacted.The second layer shall be 5 inches deep, loose measurement, and shall contain no particles that would be retained on a one inch (25.0 mm)sieve. The remaining third and subsequent layers of backfill shall not exceed 8 inches of loose measurement and be excavated or imported material and shall not contain stone or aggregate larger than 4 inches maximum diameter. The second and subsequent layers shall be thoroughly tamped and compacted to at least the density of the adjacent material. If the cable is to be installed in locations or areas where other compaction requirements are specified (under pavements, embankments, etc.) the backfill compaction shall be to a minimum of 100 percent of ASTM D1557. Trenches shall not contain pools of water during backfilling operations. The trench shall be completely backfilled and tamped level with the adjacent surface, except that when turf is to be established over the trench, the backfilling shall be stopped at an appropriate depth consistent with the type of turfing operation to be accommodated. A proper allowance for settlement shall also be provided. Any excess excavated material shall be removed and disposed of per the plans and specifications. Underground electrical warning (caution) tape shall be installed in the trench above all direct-buried cable. Contractor shall submit a sample of the proposed warning tape for acceptance by the RPR. If not shown on the plans, the warning tape shall be located 6 inches) above the direct-buried cable or the counterpoise wire if present. A 3-6 inch wide polyethylene film detectable tape, with a metalized foil core, shall be installed above all direct buried cable or counterpoise. The tape shall be of the color and have a continuous legend as indicated on the plans. The tape shall be installed 8 inches minimum below finished grade. c. Restoration. Following restoration of all trenching near airport movement surfaces, the Contractor shall visually inspect the area for foreign object debris(FOD)and remove any that is found. Where soil and sod has been removed, it shall be replaced as soon as possible after the backfilling is completed. All areas disturbed by work shall be restored to its original condition. The restoration shall include the sodding, topsoiling, and seeding as shown on the plans. The Contractor shall be held responsible for maintaining all disturbed surfaces and replacements until final acceptance. When trenching is through paved areas, restoration shall be equal to existing conditions. If the cable is to be installed in locations or areas where other compaction requirements are specified (under pavements, embankments, etc.) the backfill compaction shall be to a minimum of 100 percent of ASTM D155. Restoration shall be considered incidental to the pay item of which it is a component part. 108-3.4 Cable markers for direct-buried cable. The location of direct buried circuits shall be marked by a concrete slab marker, 2 feet square and 4-6 inch thick, extending approximately one inch above the surface. Each cable run from a line of lights and signs to the equipment vault shall be marked at approximately every 200 feet along the cable run, with an additional marker at each change of direction of cable run. All other direct-buried cable shall be marked in the same manner. Cable markers shall be City Project No: 26122 Issue For Bids L-108-6 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 installed directly above the cable. The Contractor shall impress the word "CABLE" and directional arrows on each cable marking slab. The letters shall be approximately 4 inches high and 3 inches wide, with width of stroke 1/2 inch and 1/4 inch deep. Stencils shall be used for cable marker lettering; no hand lettering shall be permitted. At the location of each underground cable connection/splice, except at lighting units, or isolation transformers, a concrete marker slab shall be installed to mark the location of the connection/splice. The Contractor shall impress the word "SPLICE" on each slab. The Contractor also shall impress additional circuit identification symbols on each slab as directed by the RPR. All cable markers and splice markers shall be painted international orange. Paint shall be specifically manufactured for uncured exterior concrete. After placement, all cable or splice markers shall be given one coat of high-visibility aviation orange paint as approved by the RPR. Furnishing and installation of cable markers is incidental to the respective cable pay item. 108-3.5 Splicing. Connections of the type shown on the plans shall be made by experienced personnel regularly engaged in this type of work and shall be made as follows: a. Cast splices. These shall be made by using crimp connectors for jointing conductors. Molds shall be assembled, and the compound shall be mixed and poured per the manufacturer's instructions and to the satisfaction of the RPR. b. Field-attached plug-in splices. These shall be assembled per the manufacturer's instructions. These splices shall be made by plugging directly into mating connectors. The joint where the connectors come together shall be finished by one of the following methods: (1) wrapped with at least one layer of rubber or synthetic rubber tape and one layer of plastic tape, one-half lapped, extending at least 1-1/2 inches on each side of the joint (2) Covered with heat shrinkable tubing with integral sealant extending at least 1-1/2 inches on each side of the joint or (3) On connector kits equipped with water seal flap; roll-over water seal flap to sealing position on mating connector. c. Factory-molded plug-in splices. These shall be made by plugging directly into mating connectors. The joint where the connectors come together shall be finished by one of the following methods: (1) Wrapped with at least one layer of rubber or synthetic rubber tape and one layer of plastic tape, one-half lapped, extending at least 1-1/2 inches on each side of the joint. (2) Covered with heat shrinkable tubing with integral sealant extending at least 1-1/2 inches on each side of the joint. or (3) On connector kits so equipped with water seal flap; roll-over water seal flap to sealing position on mating connector. d. Taped or heat-shrink splices. A taped splice shall be made in the following manner: Bring the cables to their final position and cut so that the conductors will butt. Remove insulation and jacket allowing for bare conductor of proper length to fit compression sleeve connector with 1/4 inch of bare conductor on each side of the connector. Prior to splicing, the two ends of the cable insulation shall be penciled using a tool designed specifically for this purpose and for cable size and type. Do not use emery paper on splicing operation since it contains metallic particles. The copper conductors shall be thoroughly cleaned. Join the conductors by inserting them equidistant into the compression connection sleeve. Crimp conductors firmly in place with crimping tool that requires a complete crimp before tool can be removed. Test the crimped connection by pulling on the cable. Scrape the insulation to assure that the entire surface over which the tape will be applied (plus 3 inches on each end) is clean.After scraping,wipe the entire area with a clean lint-free cloth. Do not use solvents. Apply high-voltage rubber tape one-half lapped over bare conductor. This tape should be tensioned as recommended by the manufacturer. Voids in the connector area may be eliminated by highly elongating the tape, stretching it just short of its breaking point. The manufacturer's recommendation for stretching tape during splicing shall be followed. Always attempt to exactly half-lap to produce a uniform buildup. Continue buildup to 1-1/2 times cable diameter over the body of the splice with ends tapered a distance of approximately one inch over the original jacket. Cover rubber tape with two layers of vinyl pressure-sensitive tape one-half lapped. Do not use glyptol or lacquer over vinyl tape as they react as solvents to the tape. No further cable covering or splice boxes are required. City Project No: 26122 Issue For Bids L-108-7 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Heat shrinkable tubing shall be installed following manufacturer's instructions. Direct flame heating shall not be permitted unless recommended by the manufacturer. Cable surfaces within the limits of the heat- shrink application shall be clean and free of contaminates prior to application. e. Assembly. Surfaces of equipment or conductors being terminated or connected shall be prepared in accordance with industry standard practice and manufacturer's recommendations. All surfaces to be connected shall be thoroughly cleaned to remove all dirt, grease, oxides, nonconductive films, or other foreign material. Paints and other nonconductive coatings shall be removed to expose base metal. Clean all surfaces at least 1/4 inch beyond all sides of the larger bonded area on all mating surfaces. Use a joint compound suitable for the materials used in the connection. Repair painted/coated surface to original condition after completing the connection. 108-3.6 Bare counterpoise wire installation for lightning protection and grounding. If shown on the plans or included in the job specifications, bare solid No. 6 AWG copper counterpoise wire shall be installed for lightning protection of the underground cables. The RPR shall select one of two methods of lightning protection for the airfield lighting circuit based upon sound engineering practice and lightning strike density. a. Equipotential.—Not used. b. Isolation — Counterpoise size is shown on the plans. The isolation method is an alternate method for use only with edge lights installed in turf and stabilized soils and raceways installed parallel to and adjacent to the edge of the pavement. NFPA 780 uses 15 feet to define "adjacent to". The counterpoise conductor shall be installed halfway between the pavement edge and the light base, mounting stake, raceway, or cable being protected. The counterpoise conductor shall be installed 8 inches minimum below grade. The counterpoise is not connected to the light base or mounting stake. An additional grounding electrode is required at each light base or mounting stake. The grounding electrode is bonded to the light base or mounting stake with a 6 AWG solid copper conductor. See AC 150/5340-30, Design and Installation Details for Airport Visual Aids and NFPA 780, Standard for the Installation of Lightning Protection Systems, Chapter 11, for a detailed description of the Isolation Method of lightning protection. c. Common Installation requirements. Grounding electrodes may be rods, ground dissipation plates, radials, or other electrodes listed in the NFPA 70 (NEC) or NFPA 780. Where raceway is installed by the directional bore, jack and bore, or other drilling method, the counterpoise conductor shall be permitted to be installed concurrently with the directional bore, jack and bore, or other drilling method raceway, external to the raceway or sleeve. The counterpoise wire shall also be exothermically welded to ground rods installed as shown on the plans but not more than 500 apart around the entire circuit. The counterpoise system shall be continuous and terminate at the transformer vault or at the power source. It shall be securely attached to the vault or equipment external ground ring or other made electrode-grounding system. The connections shall be made as shown on the plans and in the specifications. Where an existing airfield lighting system is being extended or modified, the new counterpoise conductors shall be interconnected to existing counterpoise conductors at each intersection of the new and existing airfield lighting counterpoise systems. d. Parallel Voltage Systems. Provide grounding and bonding in accordance with NFPA 70, National Electrical Code. 108-3.7 Counterpoise installation above multiple conduits and duct banks. Counterpoise wires shall be installed above multiple conduits/duct banks for airfield lighting cables, with the intent being to provide City Project No: 26122 Issue For Bids L-108-8 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 a complete area of protection over the airfield lighting cables. When multiple conduits and/or duct banks for airfield cable are installed in the same trench, the number and location of counterpoise wires above the conduits shall be adequate to provide a complete area of protection measured 45 degrees each side of vertical. Where duct banks pass under pavement to be constructed in the project, the counterpoise shall be placed above the duct bank. Reference details on the construction plans. 108-3.8 Counterpoise installation at existing duct banks. When airfield lighting cables are indicated on the plans to be routed through existing duct banks, the new counterpoise wiring shall be terminated at ground rods at each end of the existing duct bank where the cables being protected enter and exit the duct bank. The new counterpoise conductor shall be bonded to the existing counterpoise system. 108-3.9 Exothermic bonding. Bonding of counterpoise wire shall be by the exothermic welding process or equivalent method accepted by the RPR. Only personnel experienced in and regularly engaged in this type of work shall make these connections. Contractor shall demonstrate to the satisfaction of the RPR, the welding kits, materials and procedures to be used for welded connections prior to any installations in the field. The installations shall comply with the manufacturer's recommendations and the following: a. All slag shall be removed from welds. b. Using an exothermic weld to bond the counterpoise to a lug on a galvanized light base is not recommended unless the base has been specially modified. Consult the manufacturer's installation directions for proper methods of bonding copper wire to the light base. See AC 150/5340-30 for galvanized light base exception. c. If called for in the plans, all buried copper and weld material at weld connections shall be thoroughly coated with 6 mm of 3MTM Scotchkote TM, or approved equivalent, or coated with coal tar Bitumastic® material to prevent surface exposure to corrosive soil or moisture. 108-3.10 Testing. The Contractor shall furnish all necessary equipment and appliances for testing the airport electrical systems and underground cable circuits before and after installation. The Contractor shall perform all tests in the presence of the RPR. The Contractor shall demonstrate the electrical characteristics to the satisfaction of the RPR. All costs for testing are incidental to the respective item being tested. For phased projects, the tests must be completed by phase. The Contractor must maintain the test results throughout the entire project as well as during the warranty period that meet the following: a. Earth resistance testing methods shall be submitted to the RPR for approval. Earth resistance testing results shall be recorded on an approved form and testing shall be performed in the presence of the RPR. All such testing shall be at the sole expense of the Contractor. b. Should the counterpoise or ground grid conductors be damaged or suspected of being damaged by construction activities the Contractor shall test the conductors for continuity with a low resistance ohmmeter. The conductors shall be isolated such that no parallel path exists and tested for continuity. The RPR shall approve of the test method selected. All such testing shall be at the sole expense of the Contractor. After installation, the Contractor shall test and demonstrate to the satisfaction of the RPR the following: c. That all affected lighting power and control circuits (existing and new) are continuous and free from short circuits. d. That all affected circuits (existing and new)are free from unspecified grounds. e. That the insulation resistance to ground of all new non-grounded high voltage series circuits or cable segments is not less than 500 megohms. Verify continuity of all series airfield lighting circuits prior to energization. City Project No: 26122 Issue For Bids L-108-9 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 f. That the insulation resistance to ground of all new non-grounded conductors of new multiple circuits or circuit segments is not less than 100 megohms. g. That all affected circuits (existing and new)are properly connected per applicable wiring diagrams. h. That all affected circuits (existing and new) are operable. Tests shall be conducted that include operating each control not less than 10 times and the continuous operation of each lighting and power circuit for not less than 1/2 hour. i. That the impedance to ground of each ground rod does not exceed 25 ohms prior to establishing connections to other ground electrodes. The fall-of-potential ground impedance test shall be used, as described by American National Standards Institute/Institute of Electrical and Electronic Engineers (ANSI/IEEE) Standard 81, to verify this requirement. As an alternate, clamp-on style ground impedance test meters may be used to satisfy the impedance testing requirement. Test equipment and its calibration sheets shall be submitted for review and approval by the RPR prior to performing the testing. Two copies of tabulated results of all cable tests performed shall be supplied by the Contractor to the RPR. Where connecting new cable to existing cable, insulation resistance tests shall be performed on the new cable prior to connection to the existing circuit. There are no approved "repair" procedures for items that have failed testing other than complete replacement. METHOD OF MEASUREMENT 108-4.2 Cable or counterpoise wire installed in trench, duct bank or conduit shall be measured by the number of linear feet installed and grounding connectors, and trench marking tape ready for operation, and accepted as satisfactory. Separate measurement shall be made for each cable or counterpoise wire installed in trench, duct bank or conduit. The measurement for this item shall include additional quantities required for slack. 108-4.3 No separate payment will be made for ground rods. BASIS OF PAYMENT 108-5.1 Payment will be made at the contract unit price for trenching, cable and bare counterpoise wire installed in trench (direct-buried), or cable and equipment ground installed in duct bank or conduit, in place by the Contractor and accepted by the RPR.This price shall be full compensation for furnishing all materials and for all preparation and installation of these materials,and for all labor, equipment,tools,and incidentals, including ground rods and ground connectors and trench marking tape, necessary to complete this item. Payment will be made under: Item L-108-5.1 No. 8 AWG, 5 kV, L-824, Type C Cable, Installed in Trench, Duct Bank or Conduit- per Linear Foot Item L-108-5.2 No. 6 AWG, Solid, Bare Copper Counterpoise Wire, Installed Above the Duct Bank or Conduit, Including Connections/Terminations - per Linear Foot REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. Advisory Circulars (AC) AC 150/5340-26 Maintenance of Airport Visual Aid Facilities AC 150/5340-30 Design and Installation Details for Airport Visual Aids City Project No: 26122 Issue For Bids L-108-10 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 AC 150/5345-7 Specification for L-824 Underground Electrical Cable for Airport Lighting Circuits AC 150/5345-26 Specification for L-823 Plug and Receptacle, Cable Connectors AC 150/5345-53 Airport Lighting Equipment Certification Program Commercial Item Description A-A-59544A Cable and Wire, Electrical (Power, Fixed Installation) A-A-55809 Insulation Tape, Electrical, Pressure-Sensitive Adhesive, Plastic ASTM International (ASTM) ASTM B3 Standard Specification for Soft or Annealed Copper Wire ASTM B8 Standard Specification for Concentric-Lay-Stranded Copper Conductors, Hard, Medium-Hard, or Soft ASTM B33 Standard Specification for Tin-Coated Soft or Annealed Copper Wire for Electrical Purposes ASTM D4388 Standard Specification for Nonmetallic Semi-Conducting and Electrically Insulating Rubber Tapes Mil Spec MIL-PRF-23586F Performance Specification: Sealing Compound (with Accelerator), Silicone Rubber, Electrical MIL-1-24391 Insulation Tape, Electrical, Plastic, Pressure Sensitive MIL-P-21035 Paint High Zinc Duct Content, Galvanizing Repair National Fire Protection Association (NFPA) NFPA-70 National Electrical Code (NEC) NFPA-780 Standard for the Installation of Lightning Protection Systems American National Standards Institute (ANSI)/Institute of Electrical and Electronics Engineers (IEEE) ANSI/IEEE STD 81 IEEE Guide for Measuring Earth Resistivity, Ground Impedance, and Earth Surface Potentials of a Ground System Federal Aviation Administration Standard FAA STD-019E Lightning and Surge Protection, Grounding Bonding and Shielding Requirements for Facilities and Electronic Equipment END OF ITEM L-108 City Project No: 26122 Issue For Bids L-108-11 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY BLANK City Project No: 26122 Issue For Bids L-108-12 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 ITEM L-110 AIRPORT UNDERGROUND ELECTRICAL DUCT BANKS AND CONDUITS DESCRIPTION 110-1.1 This item shall consist of underground electrical conduits and duct banks (single or multiple conduits encased in concrete or buried in sand) installed per this specification at the locations and per the dimensions, designs, and details shown on the plans. This item shall include furnishing and installing of all underground electrical duct banks and individual and multiple underground conduits. It shall also include all turfing trenching, backfilling, removal, and restoration of any paved or turfed areas; concrete encasement, mandrelling, pulling lines, duct markers, plugging of conduits,and the testing of the installation as a completed system ready for installation of cables per the plans and specifications. This item shall also include furnishing and installing conduits and all incidentals for providing positive drainage of the system. Verification of existing ducts is incidental to the pay items provided in this specification. Refer to Item SS- 301 for additional electrical demolition work requirements. EQUIPMENT AND MATERIALS 110-2.1 General. a. All equipment and materials covered by referenced specifications shall be subject to acceptance through manufacturer's certification of compliance with the applicable specification when requested by the RPR. b. Manufacturer's certifications shall not relieve the Contractor of the responsibility to provide materials per these specifications and acceptable to the RPR. Materials supplied and/or installed that do not comply with these specifications shall be removed, when directed by the RPR and replaced with materials, that comply with these specifications, at the Contractor's cost. c. All materials and equipment used to construct this item shall be submitted to the RPR for approval prior to ordering the equipment. Submittals consisting of marked catalog sheets or shop drawings shall be provided. Submittal data shall be presented in a clear, precise and thorough manner. Original catalog sheets are preferred. Photocopies are acceptable provided they are as good a quality as the original. Clearly and boldly mark each copy to identify products or models applicable to this project. Indicate all optional equipment and delete non-pertinent data. Submittals for components of electrical equipment and systems shall identify the equipment for which they apply on each submittal sheet. Markings shall be made bold and clear with arrows or circles (highlighting is not acceptable). The Contractor is solely responsible for delays in project that accrue directly or indirectly from late submissions or resubmissions of submittals. d. The data submitted shall be sufficient, in the opinion of the RPR, to determine compliance with the plans and specifications. The Contractor's submittals shall be submitted in pdf format, tabbed by specification section. The RPR reserves the right to reject any and all equipment, materials or procedures that do not meet the system design and the standards and codes specified in this document. e. All equipment and materials furnished and installed under this section shall be guaranteed against defects in materials and workmanship for a period of at least twelve (12) months from final acceptance by the Owner. The defective materials and/or equipment shall be repaired or replaced, at the Owner's discretion, with no additional cost to the Owner. 110-2.2 Steel conduit. Rigid galvanized steel (RGS) conduit and fittings shall be hot dipped galvanized inside and out and conform to the requirements of Underwriters Laboratories Standards 6, 514B, and 1242. All RGS conduits or RGS elbows installed below grade, in concrete, permanently wet locations or other similar environments shall be painted with a 10-mil thick coat of asphaltum sealer or shall have a factory- bonded polyvinyl chloride (PVC) cover. Any exposed galvanizing or steel shall be coated with 10 mils of asphaltum sealer. When using PVC coated RGS conduit, care shall be exercised not to damage the factory PVC coating. Damaged PVC coating shall be repaired per the manufacturer's written instructions. In lieu of PVC coated RGS, corrosion wrap tape shall be permitted to be used where RGS is in contact with direct earth." City Project No: 26122 Issue For Bids L-110-1 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 110-2.3 Plastic conduit. Plastic conduit and fittings-shall conform to the following requirements: • UL 514B covers W-C-1094-Conduit fittings all types, classes 1 thru 3 and 6 thru 10. • UL 514C covers W-C-1094-all types, Class 5 junction box and cover in plastic (PVC). • UL 651 covers W-C-1094-Rigid PVC Conduit, types I and II, Class 4. • UL 651A covers W-C-1094-Rigid PVC Conduit and high-density polyethylene(HDPE)Conduit type III and Class 4. Underwriters Laboratories Standards UL-651 and Article 352 of the current National Electrical Code shall be one of the following, as shown on the plans: a. Type I-Schedule 40 and Schedule 80 PVC suitable for underground use either direct-buried or encased in concrete. b. Type II-Schedule 40 PVC suitable for either above ground or underground use. c. Type III-Schedule 80 PVC suitable for either above ground or underground use either direct-buried or encased in concrete. d. Type III -HDPE pipe, minimum standard dimensional ratio (SDR) 11, suitable for placement with directional boring under pavement. The type of solvent cement shall be as recommended by the conduit/fitting manufacturer. 110-2.4 Split conduit. Split conduit shall be pre-manufactured for the intended purpose and shall be made of steel or plastic. 110-2.5 Conduit spacers. Conduit spacers shall be prefabricated interlocking units manufactured for the intended purpose. They shall be of double wall construction made of high grade, high density polyethylene complete with interlocking cap and base pads. They shall be designed to accept No. 4 reinforcing bars installed vertically. 110-2.6 Concrete. Concrete shall be proportioned, placed, and cured per state department of transportation structural concrete with minimum 25%Type F fly ash, and a minimum allowable compressive strength of 4,000 psi (28 MPa). 110-2.7 Precast concrete structures. Precast concrete structures shall be furnished by a plant meeting National Precast Concrete Association Plant Certification Program or another RPR approved third party certification program. Precast concrete structures shall conform to ASTM C478. 110-2.8 Flowable backfill. RA-W-ahio used- to h-nL foil nnr„+„i+ and d in+ honk +rennhes shall r--A-nfn—rrA to+ requirements of Item P-1 53, Controried Lew Strength Material. 110-2.9 Detectable warning tape. Plastic, detectable, American Public Works Association (APWA) red (electrical power lines, cables, conduit and lighting cable), orange (telephone/fiber optic cabling) with continuous legend magnetic tape shall be polyethylene film with a metallized foil core and shall be 3-6 inches wide. Detectable tape is incidental to the respective bid item. CONSTRUCTION METHODS 110-3.1 General. The Contractor shall install underground duct banks and conduits at the approximate locations indicated on the plans. The RPR shall indicate specific locations as the work progresses, if required to differ from the plans. Duct banks and conduits shall be of the size, material, and type indicated on the plans or specifications. Where no size is indicated on the plans or in the specifications, conduits shall be not less than 2 inches inside diameter or comply with the National Electrical Code based on cable to be installed, whichever is larger. All duct bank and conduit lines shall be laid so as to grade toward access points and duct or conduit ends for drainage. Unless shown otherwise on the plans, grades shall City Project No: 26122 Issue For Bids L-110-2 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 be at least 3 inches per 100 feet. On runs where it is not practicable to maintain the grade all one way, the duct bank and conduit lines shall be graded from the center in both directions toward access points or conduit ends,with a drain into the storm drainage system. Pockets or traps where moisture may accumulate shall be avoided. Under pavement, the top of the duct bank shall not be less than 18 inches below the subgrade; in other locations, the top of the duct bank or underground conduit shall be not less than 18 inches below finished grade. The Contractor shall mandrel each individual conduit whether the conduit is direct-buried or part of a duct bank. An iron-shod mandrel, not more than 1/4 inch smaller than the bore of the conduit shall be pulled or pushed through each conduit. The mandrel shall have a leather or rubber gasket slightly larger than the conduit hole. The Contractor shall swab out all conduits/ducts and clean base can, manhole, pull boxes, etc., interiors immediately prior to pulling cable. Once cleaned and swabbed the light bases, manholes, pull boxes, etc., and all accessible points of entry to the duct/conduit system shall be kept closed except when installing cables. Cleaning of ducts, base cans, manholes,etc., is incidental to the pay item of the item being cleaned. All raceway systems left open, after initial cleaning, for any reason shall be recleaned at the Contractor's expense. All accessible points shall be kept closed when not installing cable. The Contractor shall verify existing ducts proposed for use in this project as clear and open. The Contractor shall notify the RPR of any blockage in the existing ducts. For pulling the permanent wiring, each individual conduit, whether the conduit is direct-buried or part of a duct bank, shall be provided with a 200-pound test polypropylene pull rope. The ends shall be secured and sufficient length shall be left in access points to prevent it from slipping back into the conduit. Where spare conduits are installed, as indicated on the plans, the open ends shall be plugged with removable tapered plugs, designed for this purpose. All conduits shall be securely fastened in place during construction and shall be plugged to prevent contaminants from entering the conduits. Any conduit section having a defective joint shall not be installed. Ducts shall be supported and spaced apart using approved spacers at intervals not to exceed 5 feet. Unless otherwise shown on the plans, concrete encased duct banks shall be used when crossing under pavements expected to carry aircraft loads,such as runways,taxiways,taxilanes, ramps and aprons.When under paved shoulders and other paved areas, conduit and duct banks shall be encased using flowable fill for protection. All conduits within concrete encasement of the duct banks shall terminate with female ends for ease in current and future use. Install factory plugs in all unused ends. Do not cover the ends or plugs with concrete. Where turf is well established and the sod can be removed, it shall be carefully stripped and properly stored. Trenches for conduits and duct banks may be excavated manually or with mechanical trenching equipment unless in pavement, in which case they shall be excavated with mechanical trenching equipment. Walls of trenches shall be essentially vertical so that a minimum of shoulder surface is disturbed. Blades of graders shall not be used to excavate the trench. When rock is encountered, the rock shall be removed to a depth of at least 3 inches below the required conduit or duct bank depth and it shall be replaced with bedding material of earth or sand containing no mineral aggregate particles that would be retained on a 1/4-inch sieve. Flowable backfill may alternatively be used. The Contractor shall ascertain the type of soil or rock to be excavated before bidding. All such rock removal shall be performed and paid for subsidiary to the respective trenching or conduit or duct bank pay item. Underground electrical warning (Caution) tape shall be installed in the trench above all underground duct banks and conduits in unpaved areas. Contractor shall submit a sample of the proposed warning tape for approval by the RPR. If not shown on the plans, the warning tape shall be located 6 inches above the duct/conduit or the counterpoise wire if present. City Project No: 26122 Issue For Bids L-110-3 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 Joints in plastic conduit shall be prepared per the manufacturer's recommendations for the particular type of conduit. Plastic conduit shall be prepared by application of a plastic cleaner and brushing a plastic solvent on the outside of the conduit ends and on the inside of the couplings. The conduit fitting shall then be slipped together with a quick one-quarter turn twist to set the joint tightly. Where more than one conduit is placed in a single trench, or in duct banks,joints in the conduit shall be staggered a minimum of 2 feet. Changes in direction of runs exceeding 10 degrees, either vertical or horizontal, shall be accomplished using manufactured sweep bends. Whether or not specifically indicated on the drawings, where the soil encountered at established duct bank grade is an unsuitable material, as determined by the RPR, the unsuitable material shall be removed per Item P-152 and replaced with suitable material. Additional duct bank supports shall be installed, as approved by the RPR. All excavation shall be unclassified and shall be considered incidental to Item L-110. Dewatering necessary for duct installation, and erosion per federal, state, and local requirements is incidental to Item L-110. Unless otherwise specified, excavated materials that are deemed by the RPR to be unsuitable for use in backfill or embankments shall be removed and disposed of offsite. Any excess excavation shall be filled with suitable material approved by the RPR and compacted per Item P-152. It is the Contractor's responsibility to locate existing utilities within the work area prior to excavation. Where existing active cables) cross proposed installations, the Contractor shall ensure that these cables are adequately protected. Where crossings are unavoidable, no splices will be allowed in the existing cables, except as specified on the plans. Installation of new cable where such crossings must occur shall proceed as follows: a. Existing cables shall be located manually. Unearthed cables shall be inspected to assure absolutely no damage has occurred b. Trenching, etc., in cable areas shall then proceed with approval of the RPR, with care taken to minimize possible damage or disruption of existing cable, including careful backfilling in area of cable. In the event that any previously identified cable is damaged during the course of construction, the Contractor shall be responsible for the complete repair. 110-3.2 Duct banks. Unless otherwise shown in the plans, duct banks shall be installed so that the top of the concrete envelope is not less than 18 inches below the bottom of the base or stabilized base course layers where installed under runways, taxiways, aprons, or other paved areas, and not less than 18 inches below finished grade where installed in unpaved areas. Unless otherwise shown on the plans, duct banks under paved areas shall extend at least 3 feet beyond the edges of the pavement or 3 feet beyond any under drains that may be installed alongside the paved area. Trenches for duct banks shall be opened the complete length before concrete is placed so that if any obstructions are encountered, provisions can be made to avoid them. Unless otherwise shown on the plans, all duct banks shall be placed on a layer of concrete not less than 3 inches thick prior to its initial set. The Contractor shall space the conduits not less than 3 inches apart measured from outside wall to outside wall). All such multiple conduits shall be placed using conduit spacers applicable to the type of conduit. As the conduit laying progresses, concrete shall be placed around and on top of the conduits not less than 3 inches thick unless otherwise shown on the plans. All conduits shall terminate with female ends for ease of access in current and future use. Install factory plugs in all unused ends. Do not cover the ends or plugs with concrete. Conduits forming the duct bank shall be installed using conduit spacers. No. 4 reinforcing bars shall be driven vertically into the soil a minimum of 6 inches to anchor the assembly into the earth prior to placing the concrete encasement. For this purpose, the spacers shall be fastened down with locking collars attached to the vertical bars. Spacers shall be installed at 5-foot intervals. Spacers shall be in the proper City Project No: 26122 Issue For Bids L-110-4 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 sizes and configurations to fit the conduits. Locking collars and spacers shall be submitted to the RPR for review prior to use. When specified,the Contractor shall reinforce the bottom side and top of encasements with steel reinforcing mesh or fabric or other approved metal reinforcement. When directed,the Contractor shall supply additional supports where the ground is soft and boggy, where ducts cross under roadways, or where shown on the plans. Under such conditions, the complete duct structure shall be supported on reinforced concrete footings, piers, or piles located at approximately 5-foot intervals. All pavement surfaces that are to have ducts installed therein shall be neatly saw cut to form a vertical face. All excavation shall be included in the contract with price for the duct. Install a plastic, detectable, color as noted, 3 to 6 inches wide tape, 8 inches minimum below grade above all underground conduit or duct lines not installed under pavement. Utilize the 3-inch wide tape only for single conduit runs. Utilize the 6-inch wide tape for multiple conduits and duct banks. For duct banks equal to or greater than 24 inches in width, utilize more than one tape for sufficient coverage and identification of the duct bank as required. When existing cables are to be placed in split duct, encased in concrete, the cable shall be carefully located and exposed by hand tools. Prior to being placed in duct, the RPR shall be notified so that he may inspect the cable and determine that it is in good condition. Where required, split duct shall be installed as shown on the drawings or as required by the RPR. 110-3.3 Conduits without concrete encasement. Trenches for single-conduit lines shall be not less than 6 inches nor more than 12 inches wide. The trench for 2 or more conduits installed at the same level shall be proportionately wider. Trench bottoms for conduits without concrete encasement shall be made to conform accurately to grade so as to provide uniform support for the conduit along its entire length. Unless otherwise shown on the plans, a layer of fine earth material, at least 4 inches thick (loose measurement)shall be placed in the bottom of the trench as bedding for the conduit. The bedding material shall consist of soft dirt, sand or other fine fill, and it shall contain no particles that would be retained on a 1/4-inch sieve. The bedding material shall be tamped until firm. Flowable backfill may alternatively be used. Unless otherwise shown on plans, conduits shall be installed so that the tops of all conduits within the Airport's secured area where trespassing is prohibited are at least 18 inches below the finished grade. Conduits outside the Airport's secured area shall be installed so that the tops of the conduits are at least 24 inches below the finished grade per National Electric Code (NEC), Table 300.5. When two or more individual conduits intended to carry conductors of equivalent voltage insulation rating are installed in the same trench without concrete encasement, they shall be spaced not less than 3 inches apart(measured from outside wall to outside wall) in a horizontal direction and not less than 6 inches apart in a vertical direction. Where two or more individual conduits intended to carry conductors of differing voltage insulation rating are installed in the same trench without concrete encasement,they shall be placed not less than 3 inches apart (measured from outside wall to outside wall) in a horizontal direction and lot less than 6 inches apart in a vertical direction. Trenches shall be opened the complete length between normal termination points before conduit is installed so that if any unforeseen obstructions are encountered, proper provisions can be made to avoid them. Conduits shall be installed using conduit spacers. No. 4 reinforcing bars shall be driven vertically into the soil a minimum of 6 inches to anchor the assembly into the earth while backfilling. For this purpose, the spacers shall be fastened down with locking collars attached to the vertical bars. Spacers shall be installed at 5-foot intervals. Spacers shall be in the proper sizes and configurations to fit the conduits. Locking collars and spacers shall be submitted to the RPR for review prior to use. 110-3.4 Markers. The location of each end and of each change of direction of conduits and duct banks shall be marked by a concrete slab marker 2 feet square and 4 - 6 inches thick extending approximately one inch above the surface. The markers shall also be located directly above the ends of all conduits or City Project No: 26122 Issue For Bids L-110-5 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 duct banks, except where they terminate in a junction/access structure or building. Each cable or duct run from a line of lights and signs to the equipment vault must be marked at approximately every 200 feet along the cable or duct run, with an additional marker at each change of direction of cable or duct run. The Contractor shall impress the word "DUCT" or"CONDUIT" on each marker slab. Impression of letters shall be done in a manner, approved by the RPR,for a neat, professional appearance.All letters and words must be neatly stenciled.After placement, all markers shall be given one coat of high-visibility orange paint, as approved by the RPR. The Contractor shall also impress on the slab the number and size of conduits beneath the marker along with all other necessary information as determined by the RPR. The letters shall be 4 inches high and 3 inches wide with width of stroke 1/2 inch and 1/4 inch deep or as large as the available space permits. Furnishing and installation of duct markers is incidental to the respective duct pay item. 110-3.5 Backfilling for conduits. For conduits, 8 inches of sand, soft earth, or other fine fill (loose measurement)shall be placed around the conduits ducts and carefully tamped around and over them with hand tampers. The remaining trench shall then be backfilled and compacted per Item P-152 except that material used for back fill shall be select material not larger than 4 inches in diameter. Flowable backfill may alternatively be used. Trenches shall not contain pools of water during back filling operations. The trench shall be completely backfilled and tamped level with the adjacent surface; except that, where sod is to be placed over the trench, the backfilling shall be stopped at a depth equal to the thickness of the sod to be used, with proper allowance for settlement. Any excess excavated material shall be removed and disposed of per instructions issued by the RPR. 110-3.6 Backfilling for duct banks. After the concrete has cured, the remaining trench shall be backfilled and compacted per Item P-152 "Excavation and Embankment" except that the material used for backfill shall be select material not larger than 4 inches in diameter. In addition to the requirements of Item P-152, where duct banks are installed under pavement, one moisture/density test per lift shall be made for each 250 linear feet of duct bank or one work period's construction, whichever is less. Flowable backfill may alternatively be used. Trenches shall not contain pools of water during backfilling operations. The trench shall be completely backfilled and tamped level with the adjacent surface; except that, where sod is to be placed over the trench, the backfilling shall be stopped at a depth equal to the thickness of the sod to be used, with proper allowance for settlement. Any excess excavated material shall be removed and disposed of per instructions issued by the RPR. 110-3.7 Restoration. Where sod has been removed, it shall be replaced as soon as possible after the backfilling is completed. All areas disturbed by the work shall be restored to its original condition. The restoration shall include sodding, topsoiling, and seeding as shown on the plans. The Contractor shall be held responsible for maintaining all disturbed surfaces and replacements until final acceptance. All restoration shall be considered incidental to the respective L-110 pay item. Following restoration of all trenching near airport movement surfaces, the Contractor shall thoroughly visually inspect the area for foreign object debris (FOD), and remove any such FOD that is found. This FOD inspection and removal shall be considered incidental to the pay item of which it is a component part. 110-3.8 Ownership of removed cable. Removed cable shall become the property of the contractor and shall be disposed off-site. City Project No: 26122 Issue For Bids L-110-6 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 METHOD OF MEASUREMENT 110-4.1 Underground conduits and duct banks shall be measured by the linear feet of conduits and duct banks installed, including encasement, locator tape, trenching and backfill with designated material, and restoration, and for drain lines, the termination at the drainage structure, all measured in place, completed, and accepted. Separate measurement shall be made for the various types and sizes. BASIS OF PAYMENT 110-5.1 Payment will be made at the contract unit price per linear foot for each type and size of conduit and duct bank completed and accepted, including trench and backfill with the designated material, and,for drain lines, the termination at the drainage structure. This price shall be full compensation for removal and disposal of existing duct banks and conduits as shown on the plans, furnishing all materials and for all preparation, assembly, and installation of these materials, and for all labor, equipment, tools, and incidentals necessary to complete this item per the provisions and intent of the plans and specifications. Payment will be made under: Item L-110-5.1 Concrete Encased Electrical Conduit, 1-Way, 2-Inch, Installed- per Linear Foot REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. Advisory Circular(AC) AC 150/5340-30 Design and Installation Details for Airport Visual Aids AC 150/5345-53 Airport Lighting Equipment Certification Program ASTM International (ASTM) ASTM A615 Standard Specification for Deformed and Plain Carbon-Steel Bars for Concrete Reinforcement National Fire Protection Association (NFPA) NFPA-70 National Electrical Code (NEC) Underwriters Laboratories (UL) UL Standard 6 Electrical Rigid Metal Conduit- Steel UL Standard 514B Conduit, Tubing, and Cable Fittings UL Standard 514C Nonmetallic Outlet Boxes, Flush-Device Boxes, and Covers UL Standard 1242 Electrical Intermediate Metal Conduit Steel UL Standard 651 Schedule 40, 80, Type EB and A Rigid PVC Conduit and Fittings UL Standard 651A Type EB and A Rigid PVC Conduit and HDPE Conduit END OF ITEM L-110 City Project No: 26122 Issue For Bids L-110-7 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 PAGE INTENTIONALLY BLANK City Project No: 26122 Issue For Bids L-110-8 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 ITEM L-125 INSTALLATION OF AIRPORT LIGHTING SYSTEMS DESCRIPTION 125-1.1 This item shall consist of airport lighting systems furnished and installed in accordance with this specification, the referenced specifications, and the applicable advisory circulars (ACs). The systems shall be installed at the locations and in accordance with the dimensions, design, and details shown in the plans. This item shall include the furnishing of all equipment, materials, services, and incidentals necessary to place the systems in operation as completed units to the satisfaction of the RPR. EQUIPMENT AND MATERIALS 125-2.1 General. a. Airport lighting equipment and materials covered by Federal Aviation Administration (FAA) specifications shall be certified under the Airport Lighting Equipment Certification Program in accordance with AC 150/5345-53, current version. FAA certified airfield lighting shall be compatible with each other to perform in compliance with FAA criteria and the intended operation. If the Contractor provides equipment that does not performs as intended because of incompatibility with the system, the Contractor assumes all costs to correct the system for to operate properly. b. Manufacturer's certifications shall not relieve the Contractor of their responsibility to provide materials in accordance with these specifications and acceptable to the RPR. Materials supplied and/or installed that do not comply with these specifications shall be removed, when directed by the RPR and replaced with materials, which do comply with these specifications, at the sole cost of the Contractor. c. All materials and equipment used shall be submitted to the RPR for approval prior to ordering the equipment. Submittals consisting of marked catalog sheets or shop drawings shall be provided. Clearly mark each copy to identify pertinent products or models applicable to this project. Indicate all optional equipment and delete non-pertinent data. Submittals for components of electrical equipment and systems shall identify the equipment for which they apply on each submittal sheet. Markings shall be clearly made with arrows or circles (highlighting is not acceptable). The Contractor shall be responsible for delays in the project accruing directly or indirectly from late submissions or resubmissions of submittals. d. The data submitted shall be sufficient, in the opinion of the RPR, to determine compliance with the plans and specifications. The Contractor's submittals shall be submitted in PDF format, tabbed by specification section. The RPR reserves the right to reject any or all equipment, materials or procedures, which, in the RPR's opinion, does not meet the system design and the standards and codes, specified herein. e. All equipment and materials furnished and installed under this section shall be guaranteed against defects in materials and workmanship for a period of at least twelve (12) months from final acceptance by the Owner. The defective materials and/or equipment shall be repaired or replaced, at the Owner's discretion, with no additional cost to the Owner. EQUIPMENT AND MATERIALS 125-2.2 Conduit/Duct. Conduit shall conform to Specification Item L-110 Airport Underground Electrical Duct Banks and Conduits. 125-2.3 Cable and Counterpoise. Cable and Counterpoise shall conform to Item L-108 Underground Power Cable for Airports. 125-2.4 Tape. Rubber and plastic electrical tapes shall be Scotch Electrical Tape Numbers 23 and 88 respectively, as manufactured by 3M Company or an approved equal. 125-2.5 Cable Connections. Cable Connections shall conform to Item L-108 Installation of Underground Cable for Airports. City Project No: 26122 Issue For Bids L-125-1 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 125-2.6 Retroreflective Markers. Not required. 125-2.7 Runway and Taxiway Lights. Runway and taxiway lights shall conform to the requirements of AC 150/5345-46. Lamps shall be of size and type indicated, or as required by fixture manufacturer for each lighting fixture required under this contract. Filters shall be of colors conforming to the specification for the light concerned or to the standard referenced. Lights Type Class Mode Style Option Base Filter Transformer Notes L-852T(L) 2 1 3 N/A 12" L-868 Blue L-830-16 1-25-4.81 Runway and Taxiway KP.ni �r Ito Pf AC IGniG24S-44 Signs. Signs Type Size Style Class Mode Notes L-858(L) 1 2 1 2 N/A 125-2.9 Runway End Identifier Light (REIL). Not required. 125-2.10 Precision Approach Path Indicator(PAPI). Not required. 125-2.11 Circuit Selector Cabinet. The E*GumtseleGtOF Gabinet shall meet the requirements of AG Rating [1 for 6.6 a es][2 for 20 amperes]. 125-2.12 Light Base and Transformer Housings. Light Race and- Tronofnrmer HE) sings sho ild nnnfnrm Size [A][B][G] shall be provided as indiGated or as required to aGGOrnmodate the foxti-l.re Ar(I vortz theFeGR. Base plates, Gever plates, and adapter plates shall be previded te aGGOMMedate varieus sizes ef fixtures. 125-2.13 Isolation Transformers. Isolation Transformers shall be Type L-830, size as required for each installation. Transformer shall conform to AC 150/5345-47. INSTALLATION 125-3.1 Installation. The Contractor shall furnish, install, connect and test all equipment, accessories, conduit, cables, wires, buses, grounds and support items necessary to ensure a complete and operable airport lighting system as specified here and shown in the plans. The equipment installation and mounting shall comply with the requirements of the National Electrical Code and state and local code agencies having jurisdiction. The Contractor shall install the specified equipment in accordance with the applicable advisory circulars and the details shown on the plans. 125-3.2 Testing. All lights shall be fully tested by continuous operation for not less than 24 hours as a completed system prior to acceptance. The test shall include operating the constant current regulator in each step not less than 10 times at the beginning and end of the 24-hour test. The fixtures shall illuminate properly during each portion of the test. City Project No: 26122 Issue For Bids L-125-2 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 125-3.3 Shipping and Storage. Equipment shall be shipped in suitable packing material to prevent damage during shipping. Store and maintain equipment and materials in areas protected from weather and physical damage. Any equipment and materials, in the opinion of the RPR, damaged during construction or storage shall be replaced by the Contractor at no additional cost to the owner. Painted or galvanized surfaces that are damaged shall be repaired in accordance with the manufacturer's recommendations. 125-3.4 Elevated and In-pavement Lights. Water, debris, and other foreign substances shall be removed prior to installing fixture base and light. A jig or holding device shall be used when installing each light fixture to ensure positioning to the proper elevation, alignment, level control, and azimuth control. Light fixtures shall be oriented with the light beams parallel to the runway or taxiway centerline and facing in the required direction. The outermost edge of fixture shall be level with the surrounding pavement. Surplus sealant or flexible embedding material shall be removed. The holding device shall remain in place until sealant has reached its initial set. METHOD OF MEASUREMENT 125-4.1 Guidance signs will be measured by the number of each type and size installed as completed units, in place, ready for operation, and accepted by the RPR. BASIS OF PAYMENT 125-5.1 Payment will be made at the Contract unit price for each complete runway or taxiway light,guidance sign, reflective marker, runway end identification light, precision approach path indicator, or abbreviated precision approach path indicator installed by the Contractor and accepted by the RPR. This payment will be full compensation for furnishing all materials and for all preparation, assembly, and installation of these materials, and for all labor, equipment, tools and incidentals necessary to complete this item. Payment will be made under: L-125-5.1 L-852T(L) In-Pavement Taxiway Edge Light, Installed-- per Each REFERENCES The publications listed below form a part of this specification to the extent referenced. The publications are referred to within the text by the basic designation only. Advisory Circulars (AC) AC 150/5340-18 Standards for Airport Sign Systems AC 150/5340-26 Maintenance of Airport Visual Aid Facilities AC 150/5340-30 Design and Installation Details for Airport Visual Aids AC 150/5345-5 Circuit Selector Switch AC 150/5345-7 Specification for L-824 Underground Electrical Cable for Airport Lighting Circuits AC 150/5345-26 Specification for L-823 Plug and Receptacle, Cable Connectors AC 150/5345-28 Precision Approach Path Indicator(PAPI) Systems AC 150/5345-39 Specification for L-853, Runway and Taxiway Retroreflective Markers AC 150/5345-42 Specification for Airport Light Bases, Transformer Housings, Junction Boxes, and Accessories City Project No: 26122 Issue For Bids L-125-3 Garver Project No. 2502477 Corpus Christi International Airport AC 150/5370-10H Taxiway Echo Rehabilitation 12/21/2018 AC 150/5345-44 Specification for Runway and Taxiway Signs AC 150/5345-46 Specification for Runway and Taxiway Light Fixtures AC 150/5345-47 Specification for Series to Series Isolation Transformers for Airport Lighting Systems AC 150/5345-51 Specification for Discharge-Type Flashing Light Equipment AC 150/5345-53 Airport Lighting Equipment Certification Program Engineering Brief(EB) EB No. 67 Light Sources Other than Incandescent and Xenon for Airport and Obstruction Lighting Fixtures END OF ITEM L-125 City Project No: 26122 Issue For Bids L-125-4 Garver Project No. 2502477 Corpus Christi International Airport TX-247 Taxiway Echo Rehabilitation Item 247 Flexible Base DepartmeTexasnt of Transportation 1. DESCRIPTION Construct a foundation course composed of flexible base. 2. MATERIALS Furnish uncontaminated materials of uniform quality that meet the requirements of the plans and specifications. Notify the Engineer of the proposed material sources and of changes to material sources.The Engineer may sample and test project materials at any time before compaction throughout the duration of the project to assure specification compliance. Use Tex-100-E material definitions. 2.1. Aggregate. Furnish aggregate of the type and grade shown on the plans and meeting the requirements of Table 1. Each source must meet Table 1 requirements for liquid limit, plasticity index,and wet ball mill for the grade specified. Do not use additives,such as but not limited to lime,cement,or fly ash to modify aggregates to meet the requirements of Table 1 unless shown on the plans. Table 1 Material Requirements Property Test Method Grade 1-2 Grade 3 Grade Grade-3 Sampling Tex-400-A Master gradation sieve size cumulative%retained 2-1/2" 0 0 0 1-3/4" Tex-110-E 0-10 0-1-0 0-5 7/8" 10-35 — As shnum en 40--35 3/8" 30-65 — the plaas 35-65 #4 45-75 45-75 45-7-5 #40 65-90 5045 ;0--90 Liquid Limit,%Max Tex-104-E 40 40 9 Plasticity Index,Maxi 10 4-2 As ;h ,e,n nn 40 Tex-106 E As shown on A,; h^�.; awn An to^n thp, As shewmea As sh�^n An Plasticity index,Min the plans oaRs theta:s the-plags Wet ball mill,%Max 40 — As ;h ,e,n nn 40 Wet ball mill,%Max increase Tex-116 E A h� un an 2-0 passingthe#40 sieve 20 the plans Min compressive strength,psi lateral pressure 0 psi 35 — As shOWR OR — lateral pressure 3 psi Tex-117E — — the s 90 lateral pressure 15 psi 175 — 476 1. Determine plastic index in accordance with Tex-107-E(linear shrinkage)when liquid limit is unattainable as defined in Tex-104-E. 2. Grade 4 may be further designated as Grade 4A,Grade 413,etc. 2.1.1. Material Tolerances.The Engineer may accept material if no more than 1 of the 5 most recent gradation tests has an individual sieve outside the specified limits of the gradation. When target grading is required by the plans, no single failing test may exceed the master grading by more than 5 percentage points on sieves No.4 and larger or 3 percentage points on sieves smaller than No.4. City Project No:26122 Issue For Bids TX-247-1 Garver Project No.2502477 Corpus Christi International Airport TX-247 Taxiway Echo Rehabilitation The Engineer may accept material if no more than 1 of the 5 most recent plasticity index tests is outside the specified limit. No single failing test may exceed the allowable limit by more than 2 points. 2.1.2. Material Types. Do not use fillers or binders unless approved. Furnish the type specified on the plans in accordance with the following: 2.1.2.1. Type A.Crushed stone produced and graded from oversize quarried aggregate that originates from a single, naturally occurring source.Do not use gravel or multiple sources. 2.1.2.2. Type B.Crushed or U RGFUshed gravel Blending of 2 or MGM ooYrneo is ollo, erl Type G.Crushed gravel with a rninirnum of 0 nrncherJ forec x fleferminerJ by 1ev_/1 Rfl_4 Dorf I Blending of 2 nr more ennrrec is ollronierl 2.1.2.4. Type D.Type A material or crushed concrete. Crushed concrete containing gravel will be considered Type D material.Crushed concrete must meet the requirements in Section 247.2.1.3.2.,`Recycled Material (Including Crushed Concrete) Requirements,"and be managed in a way to provide for uniform quality.The Engineer may require separate dedicated stockpiles in order to verify compliance. 2�.2.5. Type E.CaliGhe, iren ore or as otherwise shown on the plar,� 2.1.3. Recycled Material. Reclaimed asphalt pavement(RAP)and other recycled materials may be used when shown on the plans. Request approval to blend 2 or more sources of recycled materials. 2.1.3.1. Limits on Percentage. Do not exceed 20%RAP by weight,when RAP is allowed,unless otherwise shown on the plans.The percentage limitations for other recycled materials will be as shown on the plans. 2.1.3.2. Recycled Material(Including Crushed Concrete)Requirements. 2.1.3.2.1. Contractor-Furnished Recycled Materials. Provide recycled materials,other than RAP,that have a maximum sulfate content of 3,000 ppm when tested in accordance with Tex-145-E.When the Contractor furnishes the recycled materials, including crushed concrete,the final product will be subject to the requirements of Table 1 for the grade specified.Certify compliance with DMS-11000,"Evaluating and Using Nonhazardous Recyclable Materials Guidelines,"for Contractor furnished recycled materials. In addition, recycled materials must be free from reinforcing steel and other objectionable material and have at most 1.5%deleterious material when tested in accordance with Tex-413-A. For RAP,do not exceed a maximum percent loss from decantation of 5.0%when tested in accordance with Tex-406-A.Test RAP without removing the asphalt. 2.1.3.2.2. Department-Furnished Required Recycled Materials.When the Department furnishes and requires the use of recycled materials,unless otherwise shown on the plans: ■ Department-required recycled material will not be subject to the requirements in Table 1, ■ Contractor-furnished materials are subject to the requirements in Table 1 and this Item, ■ the final product, blended,will be subject to the requirements in Table 1, and ■ for final product,unblended(100%Department-furnished required recycled material),the liquid limit, plasticity index,wet ball mill,and compressive strength is waived. Crush Department-furnished RAP so that 100%passes the 2 in.sieve.The Contractor is responsible for uniformly blending to meet the percentage required. 2.1.3.2.3. Department-Furnished and Allowed Recycled Materials.When the Department furnishes and allows the use of recycled materials or allows the Contractor to furnish recycled materials,the final blended product is subject to the requirements of Table 1 and the plans. City Project No:26122 Issue For Bids TX-247-2 Garver Project No.2502477 Corpus Christi International Airport TX-247 Taxiway Echo Rehabilitation 2.1.3.3. Recycled Material Sources.Department-owned recycled material is available to the Contractor only when shown on the plans. Return unused Department-owned recycled materials to the Department stockpile location designated by the Engineer unless otherwise shown on the plans. The use of Contractor-owned recycled materials is allowed when shown on the plans. Contractor-owned surplus recycled materials remain the property of the Contractor. Remove Contractor-owned recycled materials from the project and dispose of them in accordance with federal,state,and local regulations before project acceptance. Do not intermingle Contractor-owned recycled material with Department-owned recycled material unless approved. 2.2. Water. Furnish water free of industrial wastes and other objectionable matter. 2.3. Material Sources. Expose the vertical faces of all strata of material proposed for use when non-commercial sources are used.Secure and process the material by successive vertical cuts extending through all exposed strata,when directed. 3. EQUIPMENT Provide machinery,tools,and equipment necessary for proper execution of the work. 3.1. Provide rollers in accordance with Item 210,"Rolling."Provide proof rollers in accordance with Item 216, "Proof Rolling,"when required. 3.2. When ride quality measurement is required,provide a high speed or lightweight inertial profiler certified at the Texas A&M Transportation Institute. Provide equipment certification documentation. Display a current decal on the equipment indicating the certification expiration date. 4. CONSTRUCTION Construct each layer uniformly,free of loose or segregated areas,and with the required density and moisture content. Provide a smooth surface that conforms to the typical sections,lines,and grades shown on the plans or as directed. Stockpile base material temporarily at an approved location before delivery to the roadway. Build stockpiles in layers no greater than 2 ft.thick. Stockpiles must have a total height between 10 and 16 ft. unless otherwise approved.After construction and acceptance of the stockpile,loading from the stockpile for delivery is allowed.Load by making successive vertical cuts through the entire depth of the stockpile. Do not add or remove material from temporary stockpiles that require sampling and testing before delivery unless otherwise approved.Charges for additional sampling and testing required as a result of adding or removing material will be deducted from the Contractor's estimates. Haul approved flexible base in clean trucks. Deliver the required quantity to each 100-ft.station or designated stockpile site as shown on the plans. Prepare stockpile sites as directed.When delivery is to the 100-ft.station, manipulate in accordance with the applicable Items. 4.1. Preparation of Subgrade or Existing Base. Remove or scarify existing asphalt concrete pavement in accordance with Item 105,"Removing Treated and Untreated Base and Asphalt Pavement,"when shown on the plans or as directed.Shape the subgrade or existing base to conform to the typical sections shown on the plans or as directed. When new base is required to be mixed with existing base,deliver, place,and spread the new flexible base in the required amount per station. Manipulate and thoroughly mix the new base with existing material to provide a uniform mixture to the specified depth before shaping. City Project No:26122 Issue For Bids TX-247-3 Garver Project No.2502477 Corpus Christi International Airport TX-247 Taxiway Echo Rehabilitation Proof roll the roadbed in accordance with Item 216,"Proof Rolling,"before pulverizing or scarifying when shown on the plans or directed.Correct soft spots as directed. 4.2. Placing.Spread and shape flexible base into a uniform layer with an approved spreader the same day as delivered unless otherwise approved. Construct layers to the thickness shown on the plans. Maintain the shape of the course.Control dust by sprinkling,as directed.Correct or replace segregated areas as directed, at no additional expense to the Department. Place successive base courses and finish courses using the same construction methods required for the first course. 4.3. Compaction.Compact using density control unless otherwise shown on the plans. Multiple lifts are permitted when shown on the plans or approved. Bring each layer to the moisture content directed.When necessary,sprinkle the material in accordance with Item 204,"Sprinkling." Begin rolling longitudinally at the sides and proceed towards the center,overlapping on successive trips by at least 1/2 the width of the roller unit. Begin rolling at the low side and progress toward the high side on superelevated curves.Offset alternate trips of the roller.Operate rollers at a speed between 2 and 6 mph as directed. Rework, recompact,and refinish material that fails to meet or that loses required moisture,density,stability, or finish requirements before the next course is placed or the project is accepted. Continue work until specification requirements are met. Perform the work at no additional expense to the Department. Before final acceptance,the Engineer will select the locations of tests and measure the flexible base depth in accordance with Tex-140-E.Correct areas deficient by more than 112 in.in thickness by scarifying,adding material as required, reshaping, recompacting,and refinishing at the Contractor's expense. 4.3.1. Ordinary Compaction. Roll with approved compaction equipment as directed. Correct irregularities, depressions,and weak spots immediately by scarifying the areas affected,adding or removing approved material as required, reshaping,and recompacting. 4.3.2. Density Control.Compact to at least 100%of the maximum dry density determined by Tex-113-E, unless otherwise shown on the plans. Maintain moisture during compaction within±2 percentage points of the optimum moisture content as determined by Tex-113-E. Measure the moisture content of the material in accordance with Tex-115-E or Tex-103-E during compaction daily and report the results the same day to the Engineer, unless otherwise shown on the plans or directed. Do not achieve density by drying the material after compaction. The Engineer will determine roadway density and moisture content of completed sections in accordance with Tex-115-E.The Engineer may accept the section if no more than 1 of the 5 most recent density tests is below the specified density and the failing test is no more than 3 pcf below the specified density. 4.4. Finishing.After completing compaction,clip,skin,or tight-blade the surface with a maintainer or subgrade trimmer to a depth of approximately 1/4 in. Remove loosened material and dispose of it at an approved location.Seal the clipped surface immediately by rolling with a pneumatic tire roller until a smooth surface is attained.Add small increments of water as needed during rolling.Shape and maintain the course and surface in conformity with the typical sections,lines,and grades as shown on the plans or as directed. Correct grade deviations greater than 1/4 in. in 16 feet measured longitudinally or greater than 1/4 in.over the entire width of the cross-section in areas where surfacing is to be placed.Correct by loosening and adding,or removing material. Reshape and re-compact in accordance with Section 247.4.3.,"Compaction." 4.5. Curing.Cure the finished section until the moisture content is at least 2 percentage points below optimum or as directed before applying the next successive course or prime coat. City Project No:26122 Issue For Bids TX-247-4 Garver Project No.2502477 Corpus Christi International Airport TX-247 Taxiway Echo Rehabilitation 4.6. Ride Quality.This section applies to the final travel lanes that receive a 1 or 2 course surface treatment for the final surface, unless otherwise shown on the plans.Measure ride quality of the base course after placement of the prime coat and before placement of the surface treatment,unless otherwise approved. Use a certified profiler operator from the Department's MPL.When requested,furnish the Engineer documentation for the person certified to operate the profiler. Provide all profile measurements to the Engineer in electronic data files within 3 days after placement of the prime coat using the format specified in Tex-1001-S.The Engineer will use Department software to evaluate longitudinal profiles to determine areas requiring corrective action.Correct 0.1-mi.sections having an average international roughness index(IRI)value greater than 100.0 in.per mile to an IRI value of 100.0 in. per mile or less for each wheel path, unless otherwise shown on the plans. Re-profile and correct sections that fail to maintain ride quality until placement of the next course,as directed.Correct re-profiled sections until specification requirements are met, as approved. Perform this work at no additional expense to the Department. 5. MEASUREMENT Flexible base will be measured as follows: ■ Flexible Base(Complete In Place).The ter-,square yard, gr any GubiG yard method. Flexible Base(Roadway DeliVOFY).The ton or any GubiG yard method-. Flexible Base(Stockpile DeliVOFY).The ton,GubiG yard in vehiGle, or GubiG yard in stockpile-. Measurement by the cubic yard in final position and square yard is a plans quantity measurement.The quantity to be paid for is the quantity shown in the proposal unless modified by Article 9.2.,"Plans Quantity Measurement."Additional measurements or calculations will be made if adjustments of quantities are required. Measurement is further defined for payment as follows. 5.2. GubiG Yard StOGkpiIe. By the GYNG yard in the final StOGI(Pile position by the Pnethed Gf average end areas. 5.3. GubmG Yard Final position. By the Gub'G yard in the GOMpleted and aGGepted final position.The volume of base Geurse is Gemputed in pl@Ge by the method of average and areas between the original subgrade or existing base surfar-es;-A.nd-the lines,grades,and slopes of the aGGepted base Gourse as shewn on the plans. 5.4. Square Yard.By the square yard of surface area in the completed and accepted final position.The surface area of the base course is based on the width of flexible base as shown on the plans. 5.5. Ton. By the ton of dry weight in vehioles as delivered.The dry weight is determined by deduoting the weight of the moisture in the material at the time of weighing frorn the gross weight of the material.The Engineer will determine themoisture nontent in the materiel in aGGordanee with Tex_103-1, from c mnlnc taken at the time of weighing. When material is measured in#KkS,the weight of the material will be determined on eertified scales,or the Contractor must provide a set of standard platform truek seales at a location appFOved by the Engineer. Seales must oonform to the reqUiFements of item 520,"Weighing and Measuring Equipment." City Project No:26122 Issue For Bids TX-247-5 Garver Project No.2502477 Corpus Christi International Airport TX-247 Taxiway Echo Rehabilitation 6. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement"will be paid for at the unit price bid for the types of work shown below. No additional payment will be made for thickness or width exceeding that shown on the typical section or provided on the plans for cubic yard in the final position or square yard measurement. Sprinkling and rolling,except proof rolling,will not be paid for directly but will be subsidiary to this Item unless otherwise shown on the plans.When proof rolling is shown on the plans or directed, it will be paid for in accordance with Item 216,"Proof Rolling." Where subgrade is constructed under this Contract,correction of soft spots in the subgrade will be at the Contractor's expense.Where subgrade is not constructed under this Contract, correction of soft spots in the subgrade will be paid in accordance with pertinent Items or Article 4.4.,"Changes in the Work." 6.1. Flexible Base(Complete In Place). Payment will be made for the type and grade specified. For cubic yard measurement,"In Vehicle,""In Stockpile,"or"In Final Position"will be specified. For square yard measurement,a depth will be specified.This price is full compensation for furnishing materials,temporary stockpiling,assistance provided in stockpile sampling and operations to level stockpiles for measurement, loading, hauling,delivery of materials,spreading, blading, mixing,shaping,placing,compacting, reworking, finishing,correcting locations where thickness is deficient,curing,furnishing scales and labor for weighing and measuring,and equipment,labor,tools,and incidentals. Payment will be made under: TX-247-CRUSHED AGGREGATE BASE COURSE(12"THICK)—per Square Yard 6.2. Flexible Base(Roadway Delivery). Payment will be made for the type and grade speeified. FOF oubie yaFd measurement,"in Vehicle,""in Stookpile,"or"in Final Position"will be speeified.The unit priee bid will not nGlude PFOG8ssing at the roadway.This PFOG8 06 fUll GE)mpensatio—n fp-.r furnkshing materials,temporary leading, ha f materials,furnishing 6Gales and labor for weighing and Fneasyring,and onninmon+ lohnr +nnle onrl incidentals measurement,6.3. Flexible Base(St0GkpiIe Delivery). Payment will be made for the type and grade spedfied. FeF GubiG yard measurement,"in Vehide"or"in StGGkpile"will be Sp8dfied.The unit PriGe bid-vVill AA-t OAG.11-0-8- pFeG@ssing at the roadway.This priGe is fUll GGrnpen6atien for furnishing and disp9sing of materials,preparing the StOGI(Pile area,temporary gr permanent StOGkpiling,assistanGe provided in StOGkI9018 sampling and eperatiens to level Sted(piles for loading, hauling,delivery of materials to the , furnishing SGales and labor for weighing and measuring,and equipment,labor,tools and incdentalr City Project No:26122 Issue For Bids TX-247-6 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation Item 341 � Dense-Graded Hot-Mix Asphalt Texas Department of Transportation 1. DESCRIPTION Construct a hot-mix asphalt(HMA)pavement layer composed of a compacted,dense-graded mixture of aggregate,asphalt binder,and additives mixed hot in a mixing plant. Payment adjustments will apply to HMA placed under this Specification unless the HMA is deemed exempt in accordance with Section 341.4.9.4., "Exempt Production." 2. MATERIALS Furnish uncontaminated materials of uniform quality that meet the requirements of the plans and specifications. Notify the Engineer of all material sources and before changing any material source or formulation.The Engineer will verify that the specification requirements are met and document all material source changes when the Contractor makes a source or formulation change.The Engineer may sample and test project materials anytime during the project to verify specification compliance in accordance with Item 6,"Control of Materials." 2.1. Aggregate. Furnish aggregates from sources that conform to the requirements shown in Table 1 and this Section.Aggregate requirements in this Section,including those shown in Table 1, may be modified or eliminated when shown on the plans.Additional aggregate requirements may be specified when shown on the plans. Provide aggregate stockpiles that meet the definitions in this Section for coarse,intermediate,or fine aggregate.Aggregate from reclaimed asphalt pavement(RAP)is not required to meet Table 1 requirements unless otherwise shown on the plans.Supply aggregates that meet the definitions in Tex-100-E for crushed gravel or crushed stone.The Engineer will designate the plant or the quarry as the sampling location. Provide samples from materials produced for the project.The Engineer will establish the Surface Aggregate Classification(SAC)and perform Los Angeles abrasion, magnesium sulfate soundness,and Micro-Deval tests. Perform all other aggregate quality tests shown in Table 1. Document all test results in the mixture design report.The Engineer may perform tests on independent or split samples to verify Contractor test results.Stockpile aggregates for each source and type separately. Determine aggregate gradations for mixture design and production testing based on the washed sieve analysis in accordance with Tex-200-F, Part II. 2.1.1. Coarse Aggregate.Coarse aggregate stockpiles must have no more than 20%material passing the No.8 sieve.Aggregates from sources listed in the Department's Bituminous Rated Source Quality Catalog (BRSQC)are preapproved for use. Use only the rated values for HMA listed in the BRSQC. Rated values for surface treatment(ST)do not apply to coarse aggregate sources used in HMA. For sources not listed in the Department's BRSQC: ■ build an individual stockpile for each material; ■ request the Department test the stockpile for specification compliance; ■ allow 30 calendar days for the Engineer to sample,test,and report results; ■ use only when tested and approved;and ■ once approved,do not add additional material to the stockpile unless otherwise allowed by the Engineer. City Project No:26122 Issue For Bids TX-341-1 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation Provide coarse aggregate with at least the minimum SAC shown on the plans. SAC requirements apply only to aggregates used on the surface of travel lanes, unless otherwise shown on the plans.The SAC for sources in the Department's Aggregate Quality Monitoring Program(AQMP) (Tex-499-A)is listed in the BRSQC. 2.1.1.1. Blending Class A and Class B Aggregates. Class B aggregate meeting all other requirements shown in Table 1 may be blended with a Class A aggregate to meet requirements for Class A materials, unless otherwise shown on the plans.When blending Class A and Class B aggregates to meet a Class A requirement,ensure that at least 50%by weight,or volume if required,of the material retained on the No.4 sieve comes from the Class A aggregate source, unless otherwise shown on the plans. Blend by volume if the bulk specific gravities of the Class A and Class B aggregates differ by more than 0.300.Coarse aggregate from RAP and recycled asphalt shingles(RAS)will be considered as Class B aggregate for blending purposes. The Engineer may perform tests anytime during production,when the Contractor blends Class A and Class B aggregates to meet a Class A requirement.The Engineer will use the Department's mix design template, when electing to verify conformance,to calculate the percent of Class A aggregate retained on the No.4 sieve by inputting the bin percentages shown from readouts in the control room at the time of production and stockpile gradations measured at the time of production.The Engineer may determine the gradations based on either washed or dry sieve analysis from samples obtained from individual aggregate cold feed bins or aggregate stockpiles.The Engineer may perform spot checks to verify the percent of Class A aggregate retained on the No.4 sieve.The Engineer will use the gradations supplied by the Contractor in the mixture design report as an input for the template.A failing spot check will require confirmation with a stockpile gradation determined by the Engineer. 2.1.1.2. Micro-Deval Abrasion.The Engineer will perform at least one Micro-Deval abrasion test in accordance with Tex-461-A for each coarse aggregate source used in the mixture design that has a rated source soundness magnesium(RSSM)loss value greater than 15 as listed in the BRSQC.The Engineer will perform testing before the start of production and may perform additional testing anytime during production.The Engineer may obtain the coarse aggregate samples from each coarse aggregate source or may require the Contractor to obtain the samples.The Engineer may waive all Micro-Deval testing based on a satisfactory test history of the same aggregate source. The Engineer will estimate the magnesium sulfate soundness loss for each coarse aggregate source,when tested, using the following formula: West._(RSSM)(MDact/RSMD) where: Mgest.=magnesium sulfate soundness loss RSSM=rated source soundness magnesium MDa,a=actual Micro-Deval percent loss RSMD=rated source Micro-Deval When the estimated magnesium sulfate soundness loss is greater than the maximum magnesium sulfate soundness loss specified,the coarse aggregate source will not be allowed for use unless otherwise approved.The Engineer will consult the Materials and Tests Division,and additional testing may be required before granting approval. 2.1.2. Intermediate Aggregate.Aggregates not meeting the definition of coarse or fine aggregate will be defined as intermediate aggregate. Supply intermediate aggregates,when used,that are free of organic impurities. Supply intermediate aggregate from coarse aggregate sources,when used,that meet the requirements shown in Table 1,unless otherwise approved. Test the stockpile if 10%or more of the stockpile is retained on the No.4 sieve,and verify that it meets the requirements in Table 1 for crushed face count(Tex-460-A)and flat and elongated particles(Tex-280-F). City Project No:26122 Issue For Bids TX-341-2 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation 2.1.3. Fine Aggregate. Fine aggregates consist of manufactured sands, screenings,and field sands. Fine aggregate stockpiles must meet the fine aggregate properties in accordance with Table 1 and the gradation requirements in accordance with Table 2. Supply fine aggregates that are free of organic impurities.The Engineer may test the fine aggregate in accordance with Tex-408-A to verify the material is free of organic impurities. Unless otherwise shown on the plans,at most 10%of the total aggregate may be field sand or other uncrushed fine aggregate. Use fine aggregate,except field sand,from coarse aggregate sources that meet the requirements shown in Table 1,unless otherwise approved. Test the stockpile if 10%or more of the stockpile is retained on the No.4 sieve and verify that it meets the requirements in Table 1 for crushed face count(Tex-460-A)and flat and elongated particles(Tex-280-F). Table 1 Aggregate Quality Requirements Property Test Method Requirement Coarse Aggregate SAC Tex-499-A AQMP As shown on the plans Deleterious material,%,Max Tex-217-F,Part 1 1.5 Decantation,%,Max Tex-217-F,Part 11 1.5 Micro-Deval abrasion,% Tex-461-A Note' Los Angeles abrasion,%,Max Tex-410-A 40 Magnesium sulfate soundness,5 Tex-411-A 30 cycles,%,Max Crushed face count,z%,Min Tex-460-A,Part 1 85 Flat and elongated particles @ 5:1, Tex-280-F 10 Max Fine Aggregate Linear shrinkage,%,Max Tex-107-E 3 Sandequivalent,%,Min Tex-203-F 453 Organic impurities Tex-408-A Note 4 1. Used to estimate the magnesium sulfate soundness loss in accordance with Section 341.2.1.1.2.,"Micro- Deval Abrasion." 2. Only applies to crushed gravel. 3. The Department may perform Tex-252-F on fine aggregates not meeting this minimum requirement. Fine aggregates with a methylene blue value of 10.0 mg/g or less may be used. 4. Optional test. Table 2 Gradation Re uirements for Fine Aggregate Sieve Size %Passing by Wt.Or Volume 3/8" 100 #8 70-100 #200 0-30 2.2. Mineral Filler.Mineral filler consists of finely divided mineral matter such as agricultural lime,crusher fines, hydrated lime,or fly ash. Mineral filler is allowed unless otherwise shown on the plans. Use no more than 2% hydrated lime or fly ash,unless otherwise shown on the plans. Use no more than 1%hydrated lime if a substitute binder is used,unless otherwise shown on the plans or allowed.Test all mineral fillers except hydrated lime and fly ash in accordance with Tex-107-E to ensure specification compliance.The plans may require or disallow specific mineral fillers. Provide mineral filler,when used,that: ■ is dry enough,free-flowing,and free of clumps and foreign matter as determined by the Engineer; ■ does not exceed 3%linear shrinkage when tested in accordance with Tex-107-E;and ■ meets the gradation requirements shown in Table 3, unless otherwise shown on the plans. City Project No:26122 Issue For Bids TX-341-3 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation Table 3 Gradation Requirements for Mineral Filler Sieve Size %Passing by Wt.or Volume #8 100 #200 55-100 2.3. Baghouse Fines.Fines collected by the baghouse or other dust-collecting equipment may be reintroduced into the mixing drum. 2.4. Asphalt Binder.Furnish the type and grade of performance-graded(PG)asphalt binder shown on the plans that meets the requirements of Item 300,"Asphalts, Oils,and Emulsions." 2.5. Tack Coat. Furnish CSS-1 H, SS-1 H, EBL,or a PG binder with a minimum high-temperature grade of PG 58 for tack coat binder in accordance with Item 300. Specialized tack coat materials on the MPL for Tracking Resistant Asphalt Interlayer(TRAIL)will be allowed or required when shown on the plans. Do not dilute emulsified asphalts at the terminal,in the field,or at any other location before use,unless required in conformance with the manufacturer's recommendation for approved TRAIL products on the MPL. 2.6. Additives. Use the type of additive specified when shown on the plans. Use the rate of additive specified in conformance with the manufacturer's recommendation.Additives that facilitate mixing and compaction or improve the quality of the mixture are allowed when approved.Provide the Engineer with documentation such as the bill of lading showing the quantity of additives used in the project unless otherwise directed. 2.6.1. Lime and Liquid Antistripping Agent. Lime or liquid antistripping agent is required when shown on the plans.When lime or a liquid antistripping agent is used,add in accordance with Item 301,"Asphalt Antistripping Agents."Do not add lime directly into the mixing drum of any plant where lime is removed through the exhaust stream unless the plant has a baghouse or dust collection system that reintroduces the lime into the drum. 2.6.2. Warm-Mix Asphalt(WMA).WMA is defined as HMA that is produced within a target temperature discharge range of 2157 and 2757 using approved WMA additives or processes from the MPL. WMA is allowed for use on all projects and is required when shown on the plans.When WMA is required,the maximum placement or target discharge temperature for WMA will be set at a value at or below 275°F. Department-approved WMA additives or processes may be used to facilitate mixing and compaction of HMA produced at target discharge temperatures above 275°F; however,such mixtures will not be defined as WMA. 2.6.3. Compaction Aid.Compaction aid is defined as a Department-approved chemical warm-mix additive, denoted as"chemical additive"on the MPL,that is used to facilitate mixing and compaction of HMA at a discharge temperature greater than 275°F. Compaction aid is allowed for use on all projects. Compaction aid is required when shown on the plans or as required in Section 341.4.7.1.,"Weather Conditions." Warm-mix foaming processes,denoted as"foaming process"on the MPL, may be used to facilitate mixing and compaction of HMA at target discharge temperatures greater than 275°F;however,warm-mix foaming processes are not defined as a compaction aid. 2.7. Recycled Materials. Use of RAP and RAS is permitted unless otherwise shown on the plans. Use of RAS is restricted to only intermediate and base mixes unless otherwise shown on the plans. Do not exceed the maximum allowable percentages of RAP and RAS in accordance with Table 4.The allowable percentages in accordance with Table 4 may be decreased or increased when shown on the plans. Determine the asphalt binder content and gradation of the RAP and RAS stockpiles for mixture design purposes in accordance with Tex-236-F, Part I.The Engineer may verify the asphalt binder content of the stockpiles anytime during City Project No:26122 Issue For Bids TX-341-4 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation production. Perform other tests on RAP and RAS when shown on the plans.Asphalt binder from RAP and RAS is designated as recycled asphalt binder. Calculate and ensure that the ratio of the recycled asphalt binder to total binder does not exceed the percentages in accordance with Table 5 during mixture design and HMA production when RAP or RAS is used. Use a separate cold feed bin for each stockpile of RAP and RAS during HMA production. Surface,intermediate,and base mixes referenced in Table 4 and Table 5 are defined as follows,unless otherwise shown on the plans. ■ Surface.The final HMA lift placed at the top of the pavement structure. ■ Intermediate.Mixtures placed below an HMA surface mix and less than or equal to 8.0 in. below the riding surface. ■ Base. Mixtures placed greater than 8.0 in. below the riding surface. Unless otherwise shown on the plans, mixtures used for bond breaker are defined as base mixtures. 2.7.1. RAP. RAP is salvaged, milled,pulverized,broken,or crushed asphalt pavement. Fractionated RAP is defined as a stockpile that contains RAP material with at least 95.0%passing the 1/2-in. sieve, before burning in the ignition oven, unless otherwise approved.The Engineer may allow the Contractor to use an alternate to the 1/2-in.screen to fractionate the RAP. Use of Contractor-owned RAP,including HMA plant waste, is permitted unless otherwise shown on the plans. Department-owned RAP stockpiles are available for the Contractor's use when the stockpile locations are shown on the plans. If Department-owned RAP is available for the Contractor's use,the Contractor may use Contractor-owned fractionated RAP and replace it with an equal quantity of Department-owned RAP. Department-owned RAP generated by required work on the Contract is available for the Contractor's use when shown on the plans. Perform any necessary tests to ensure Contractor-or Department-owned RAP is appropriate for use.The Department will not perform any tests or assume any liability for the quality of the Department-owned RAP unless otherwise shown on the plans.The Contractor will retain ownership of RAP generated on the project when shown on the plans. Do not use Department-or Contractor-owned RAP contaminated with dirt or other objectionable materials. Do not use Department-or Contractor-owned RAP if the decantation value exceeds 5%and the plasticity index is greater than 8.Test the stockpiled RAP for decantation in accordance with Tex-406-A, Part I. Determine the plasticity index in accordance with Tex-106-E if the decantation value exceeds 5%.The decantation and plasticity index requirements do not apply to RAP samples with asphalt removed by extraction or ignition. Do not intermingle Contractor-owned RAP stockpiles with Department-owned RAP stockpiles. Remove unused Contractor-owned RAP material from the project site upon completion of the project. Return unused Department-owned RAP to the designated stockpile location. Table 4 Maximum Allowable Amounts of RAP' Maximum Allowable Maximum Allowable Fractionated RAPz(%) Unfractionated RAPS(%) Surface IntermediateeF Base Surface Intermediate Base 20.0 30.0 40.0 10.0 10.0 10.0 1. Must also meet the recycled binder to total binder ratio shown in Table 5. 2. Up to 5%RAS may be used separately or as a replacement for fractionated RAP. 3. Unfractionated RAP may not be combined with fractionated RAP or RAS. 2.7.2. RAS. RAS is defined as processed asphalt shingle material from manufacturing of asphalt roofing shingles or from re-roofing residential structures. Post-manufactured RAS is processed manufacturer's shingle scrap byproduct.Post-consumer RAS is processed shingle scrap removed from residential structures. Use of post- manufactured RAS or post-consumer RAS(tear-offs)is not permitted in surface mixtures unless otherwise shown on the plans. RAS may be used in intermediate and base mixtures unless otherwise shown on the City Project No:26122 Issue For Bids TX-341-5 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation plans. Up to 3%RAS may be used separately or as a replacement for fractionated RAP in accordance with Table 4 and Table 5. RAS may be used separately or in conjunction with RAP. Comply with all regulatory requirements stipulated for RAS by TCEQ. Process the RAS by ambient grinding or granulating such that 100%of the particles pass the 3/8-in.sieve when tested in accordance with Tex-200-F, Part I. Perform a sieve analysis on processed RAS material before extraction(or ignition)of the asphalt binder. Add sand meeting the requirements of Table 1 and Table 2,or fine RAP,to RAS stockpiles if needed to keep the processed material workable.Any stockpile that contains RAS will be considered a RAS stockpile and be limited to no more than 3.0%of the HMA mixture in accordance with Table 4. Certify compliance of the RAS with DMS-11000,"Evaluating and Using Nonhazardous Recyclable Materials Guidelines."Treat RAS as an established nonhazardous recyclable material if it has not come into contact with any hazardous materials. Use RAS from shingle sources on the MPL. Remove all materials that are not part of the shingle,such as wood, paper, metal,plastic,and felt paper, before use. Determine the deleterious content of RAS material for mixture design purposes in accordance with Tex-217-F, Part III. Do not use RAS if deleterious materials are more than 0.5%of the stockpiled RAS, unless otherwise approved. Submit a sample for approval before submitting the mixture design.The Department will perform the testing for deleterious material of RAS to determine specification compliance. 2.8. Substitute Binders.No binder substitution will be allowed when shown on the plans.The Contractor may use a substitute PG binder shown in Table 5 instead of the PG binder originally specified, if using recycled materials,and if the substitute PG binder and mixture made with the substitute PG binder meet the following. ■ The substitute binder meets the specification requirements for the substitute binder grade in accordance with Section 300.2.11.,'Performance-Graded Binders." ■ The mixture has less than 10.0 mm of rutting on the Hamburg wheel test(Tex-242-F)after the number of passes required for the originally specified binder. Use of substitute PG binders may be allowed only at the discretion of the Engineer if the Hamburg wheel test results are between 10.0 mm and 12.5 mm. City Project No:26122 Issue For Bids TX-341-6 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation Table 5 Allowable Substitute PG Binders and Maximum Recycled Binder Ratios Originally Specified Allowable Substitute Maximum Ratio of Recycled Binder'to Total Binder PG Binder PG Binder Surface Intermediate Base HMA 76-222 70-22 or 64-22 20.0 20.0 20.0 70-28 or 64-28 30.0 35.0 40.0 70 222 64-22 20.0 20.0 20.0 64-28 or 58-28 30.0 35.0 40.0 64-222 58-28 30.0 35.0 40.0 76 282 70-28 or 64-28 20.0 20.0 20.0 64-34 30.0 35.0 40.0 70 282 64-28 or 58-28 20.0 20.0 20.0 64-34 or 58-34 30.0 35.0 40.0 64-282 58-28 20.0 20.0 20.0 58-34 30.0 35.0 40.0 WMA3 76-222 70-22 or 64-22 30.0 35.0 40.0 70-222 64-22 or 58-28 30.0 35.0 40.0 64-224 58-28 30.0 35.0 40.0 76-282 70-28 or 64-28 30.0 35.0 40.0 70-282 64-28 or 58-28 30.0 35.0 40.0 64-284 58-28 30.0 35.0 40.0 1. Combined recycled binder from RAP and RAS. 2. Use no more than 20.0%recycled binder when using this originally specified PG binder. 3. WMA as defined in Section 341.2.6.2.,"Warm Mix Asphalt(WMA)." 4. When used with WMA,this originally specified PG binder is allowed for use at the maximum recycled binder ratios shown in this table. 3. EQUIPMENT Provide required or necessary equipment in accordance with Item 320,"Equipment for Asphalt Concrete Pavement." 4. CONSTRUCTION Produce, haul, place,and compact the specified paving mixture. In addition to tests required in accordance with the Specification,the Contractor may perform other QC tests as necessary.Anytime during the project, the Engineer may perform production and placement tests as necessary in accordance with Item 5,"Control of the Work."Schedule and participate in a mandatory pre-paving meeting with the Engineer on or before the first day of paving unless otherwise shown on the plans. 4.1. Certification. Personnel certified by the Department-approved HMA certification program must conduct all mixture designs,sampling,and testing in accordance with Table 6.Supply the Engineer with a list of certified personnel and copies of their current certificates before beginning production and when personnel changes are made. Provide a mixture design developed and signed by a Level 2-certified specialist. Provide Level 1A-certified specialists at the plant during production operations. Provide Level 1 B-certified specialists to conduct placement tests. Provide Level AGG101-certified specialists for aggregate testing. City Project No:26122 Issue For Bids TX-341-7 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation Table 6 Test Methods,Test Responsibility,and Minimum Certification Levels Test Description Test Method Contractor En ineer Level' 1.Aggregrate and Recycled Material Testing Sampling Tex-221-F ✓ ✓ 1A Dry sieve Tex-200-F,Part I ✓ ✓ 1A Washed sieve Tex-200-F,Part 11 ✓ ✓ 1A Deleterious material Tex-217-F,Parts I&III ✓ ✓ 1A Decantation Tex-217-F,Part 11 ✓ ✓ 1A Los Angeles abrasion Tex-410-A ✓ TxDOT Magnesium sulfate soundness Tex-411-A ✓ TxDOT Micro-Deval abrasion Tex-461-A ✓ 2 Crushed face count Tex-460-A ✓ ✓ 2 Flat and elongated particles Tex-280-F ✓ ✓ 2 Linear shrinkage Tex-107-E ✓ ✓ 2 Sand equivalent Tex-203-F ✓ ✓ 2 Organic impurities Tex-408-A ✓ ✓ 2 2.Asphalt Binder&Tack Coat Sampling Asphalt binder sampling Tex-500-C,Part 11 ✓ ✓ 1A/1 B Tack coat sampling Tex-500-C,Part 111 ✓ ✓ 1A/1 B 3.Mix Design&Verification Design and JMF changes Tex-204-F ✓ ✓ 2 Mixing Tex-205-F ✓ ✓ 2 Molding TGC Tex-206-F ✓ ✓ 1A Molding SGC Tex-241-F ✓ ✓ 1A Laboratory-molded density Tex-207-F ✓ ✓ 1A VMAz calculation only) Tex-204-F ✓ ✓ 2 Rice gravity Tex-227-F ✓ ✓ 1A Ignition oven correction factors3 Tex-236-F ✓ ✓ 2 Indirect tensile strength Tex-226-F ✓ ✓ 2 Hamburg Wheel test Tex-242-F ✓ ✓ 2 Boil test Tex-530-C ✓ ✓ 1A 4.Production Testing Selecting production random numbers Tex-225-F,Part I ✓ 1A Mixture sampling Tex-222-F ✓ ✓ 1A Molding TGC Tex-206-F ✓ ✓ 1A Molding SGC Tex-241-F ✓ ✓ 1A Laboratory-molded density Tex-207-F ✓ ✓ 1A VMAZ calculation only) Tex-204-F ✓ ✓ 1A Rice gravity Tex-227-F ✓ ✓ 1A Gradation&asphalt binder content3 Tex-236-F ✓ ✓ 1A Control charts Tex-233-F ✓ ✓ 1A Moisture content Tex-212-F ✓ ✓ 1A Hamburg Wheel test Tex-242-F ✓ ✓ 2 Micro-Deval abrasion Tex-461-A ✓ 2 Boil test Tex-530-C ✓ ✓ 1A Abson recovery Tex-211-F ✓ TOOT Overlay test Tex-248-F ✓ TOOT Cantabro loss Tex-245-F ✓ 2 5.Placement Testing Selecting placement random numbers Tex-225-F,Part 11 ✓ 1A/1 B Trimming roadway cores Tex-207-F ✓ ✓ 1A/1B In lace air voids Tex-207-F ✓ ✓ 1A/1 B Establish rolling pattern Tex-207-F ✓ 1B Control charts Tex-233-F ✓ ✓ 1A Ride quality measurement Tex-1001-S ✓ ✓ Note Segregation(density profile) Tex-207-F,Part V ✓ ✓ 1 B Longitudinal moint density Tex-207-F,Part VII ✓ ✓ 1 B Thermal profile Tex-244-F ✓ ✓ 1 B 1. Level 1A, 1 B,and 2 are certification levels provided by the Hot Mix Asphalt Center certification program. 2. Voids in mineral aggregates. 3. Refer to Section 341.4.9.2.3.,'Production Testing,"for exceptions to using an ignition oven. 4. Profiler and operator are required to be certified at the Texas A&M Transportation Institute facility when Surface Test Type B is specified. City Project No:26122 Issue For Bids TX-341-8 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation 4.2. Reporting and Responsibilities. Use Department-provided templates to record and calculate all test data, including mixture design, production and placement QC and QA,control charts,thermal profiles,segregation density profiles,and longitudinal joint density. Obtain the current version of the templates from the Department's website or from the Engineer.The Engineer and the Contractor will provide any available test results to the other party when requested.The maximum allowable time for the Contractor and Engineer to exchange test data is as shown in Table 7, unless otherwise approved.The Engineer and the Contractor will immediately report to the other party any test result that requires suspension of production or placement, or a payment adjustment less than 1.000,or that fails to meet the specification requirements. Record and electronically submit all test results and pertinent information on Department-provided templates. Subsequent sublots placed after test results are available to the Contractor,which require suspension of operations, may be considered unauthorized work. Unauthorized work will be accepted or rejected at the discretion of the Engineer in accordance with Article 5.3.,"Conformity with Plans,Specifications,and Special Provisions." Table 7 R rting Schedule Description Reported By Reported To To Be Reported Within Production ualit Control Gradation' Asphalt binder content' Laboratory-molded densit 2 Contractor Engineer 1 working day completion of Moisture content3 the sublot Boil testa Production Quality Assurance Gradation3 Asphalt binder content3 Laboratory-molded density' Engineer Contractor 1 working day of completion of HamburgWheel test2 g the sublot Boil testa Bindertests2 Placement Quality Control In- lace airvoids2 Segregation' Contractor Engineer 1 working day of completion of Longitudinal joint density' g the lot Thermalprofile' Placement Q ality Assurance In-place air voids' Se re ation2 1 working day of receipt of the Longitudinal joint densit 2 Engineer Contractor trimmed Thermal profile2 cores for in-place air voids4 Aging ratio2 2 working days of performing all Payment adjustment summary Engineer Contractor required tests and receiving Contractor test data 1. These tests are required on every sublot. 2. Optional test.To be reported as soon as results become available. 3. To be performed at the frequency specified on the plans. 4. 2 days are allowed if cores cannot be dried to constant weight within 1 day. The Engineer will use the Department-provided template to calculate all payment adjustment factors for the lot. Sublot samples may be discarded after the Engineer and Contractor sign off on the payment adjustment summary documentation for the lot. Use the procedures described in Tex-233-F to plot the results of all QC and QA testing. Update the control charts as soon as test results for each sublot become available.Make the control charts readily accessible at the field laboratory.The Engineer may suspend production for failure to update control charts. City Project No:26122 Issue For Bids TX-341-9 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation 4.3. Quality Control Plan(QCP). Develop and follow the QCP in detail.Obtain approval for changes to the QCP made during the project.The Engineer may suspend operations if the Contractor fails to comply with the QCP. Submit a written QCP before the mandatory pre-paving meeting. Receive approval of the QCP before beginning production. Include the following items in the QCP. 4.3.1. Project Personnel. For project personnel, include: ■ a list of individuals responsible for QC with authority to take corrective action, ■ current contact information for each individual listed,and ■ current copies of certification documents for individuals performing specified QC functions. 4.3.2. Material Delivery and Storage. For material delivery and storage, include: ■ the sequence of material processing,delivery,and minimum quantities to assure continuous plant operations; ■ aggregate stockpiling procedures to avoid contamination and segregation; ■ frequency,type,and timing of aggregate stockpile testing to assure conformance with material requirements before mixture production;and ■ procedure for monitoring the quality and variability of asphalt binder. 4.3.3. Production. For production,include: ■ loader operation procedures to avoid contamination in cold bins; ■ procedures for calibrating and controlling cold feeds; ■ procedures to eliminate debris or oversized material; ■ procedures for adding and verifying rates of each applicable mixture component(e.g.,aggregate, asphalt binder, RAP, RAS,lime,liquid antistrip, compaction aid,foaming process, and WMA); ■ procedures for reporting job control test results;and ■ procedures to avoid segregation and drain-down in the silo. 4.3.4. Loading and Transporting. For loading and transporting,include: ■ type and application method for release agents,and ■ truck-loading procedures to avoid segregation. 4.3.5. Placement and Compaction. For placement and compaction, include: ■ proposed agenda for mandatory pre-paving meeting, including date and location; ■ proposed paving plan (e.g., production rate, paving widths,joint offsets, and lift thicknesses); ■ type and application method for release agents in the paver and on rollers,shovels,lutes,and other utensils; ■ procedures for the transfer of mixture into the paver while avoiding physical and thermal segregation and preventing material spillage; ■ process to balance production,delivery,paving,and compaction to achieve continuous placement operations and good ride quality; ■ paver operations(e.g., speed,operation of wings,and height of mixture in auger chamber)to avoid physical and thermal segregation and other surface irregularities;and ■ procedures to construct quality longitudinal and transverse joints. 4.4. Mixture Design. 4.4.1. Design Requirements. Use the dense-graded design procedure provided in Tex-204-F,unless otherwise shown on the plans. Design the mixture to meet the requirements shown in Tables 1,2,3,4,5,8,9,and 10. City Project No:26122 Issue For Bids TX-341-10 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation Design the mixture using an SGC,and 50 gyrations as the design number of gyrations(Ndesign). Use a target laboratory-molded density of 96.0%to design the mixture; however, adjustments can be made to the Ndesign value as shown in Table 9.The Ndesign level may be reduced to at least 35 gyrations at the Contractor's discretion. Use a Department-approved laboratory on the MPL to perform the Hamburg wheel test and provide results with the mixture design,or provide the laboratory mixture and request that the Department perform the Hamburg wheel test. Upon receiving the sample from the Contractor,the Engineer will be allowed 10 working days to provide the Contractor with Hamburg wheel test results on the laboratory mixture design. The Engineer will provide the mixture design when shown on the plans.The Contractor may submit a new mixture design anytime during the project. The Engineer will verify and approve all mixture designs(JMF1) before the Contractor can begin production. Provide the Engineer with a mixture design report using the Department-provided template. Include the following items in the report: ■ the combined aggregate gradation,source,specific gravity,and percent of each material used; ■ the binder source and optimum design asphalt content; ■ asphalt binder content and aggregate gradation of RAP and RAS stockpiles; ■ the Ndesign level used on the SGC; ■ results of all applicable tests; ■ the mixing and molding temperatures; ■ the signature of the Level 2 person or persons who performed the design; ■ the date the mixture design was performed;and ■ a unique identification number for the mixture design. Table 8 Master Gradation Limits(%Passing by eight or Volume and VMA Requirements Sieve A B C D F Size Coarse Fine Coarse Fine Fine Base Base Surface Surface Mixture 2" 100.01 — — — — 1-1/2" 98.0-100.0 100.01 — — — 1" 78.0-94.0 98.0-100.0 100.01 — — 3/4" 64.0-85.0 84.0-98.0 95.0-100.0 100.01 — 1/2" 50.0-70.0 — — 98.0-100.0 100.01 3/8" — 60.0-80.0 70.0-85.0 85.0-100.0 98.0-100.0 #4 30.0-50.0 40.0-60.0 43.0-63.0 50.0-70.0 70.0-90.0 #8 22.0-36.0 29.0-43.0 32.0-44.0 35.046.0 38.0-48.0 #30 8.0-23.0 13.0-28.0 14.0-28.0 15.0-29.0 12.0-27.0 #50 3.0-19.0 6.0-20.0 7.0-21.0 7.0-20.0 6.0-19.0 #200 2.0-7.0 2.0-7.0 2.0-7.0 2.0-7.0 2.0-7.0 Design VMA,%Minimum — 12.0 13.0 14.0 15.0 16.0 Production Plant-Produced VMA,%Minimum — 11.5 12.5 13.5 14.5 15.5 1. Defined as maximum sieve size.No tolerance allowed. City Project No:26122 Issue For Bids TX-341-11 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation Table 9 Laboratory Mixture Design Pro erties Mixture Property Test Method Requirement Target laboratory-molded density,% TGC Tex-207-F 96.5' Design gyrations(Ndesign for SGC Tex-241-F 502 Indirect tensile strength(dry),psi Tex-226-F 85-2003 Boil test^ Te2i-530-C — 1. Increase to 97.0%or 97.5%at the Contractor's discretion or when shown on the plans or specification. 2. Adjust within a range of 35-100 gyrations when shown on the plans or specification or when mutually agreed between the Engineer and Contractor. 3. The Engineer may allow the IDT strength to exceed 200 psi if the corresponding Hamburg Wheel rut depth is greater than 3.0 mm and less than 12.5 mm. 4. Used to establish baseline for comparison to production results.May be waived when approved. Table 10 Hamburg Wheel Test Requirements High-Temperature Test Method Minimum#of Passes Binder Grade 12.5 mmi Rut Depth,Tested @ 500C PG 64 or lower 10,0002 PG 70 Tex-242-F 15,0003 PG 76 or higher 20,000 1. When the rut depth at the required minimum number of passes is less than 3 mm,the Engineer may require the Contractor to increase the target laboratory-molded density (TGC)by 0.5%to no more than 97.5%or lower the Ndesign level(SGC)to no less than 35 gyrations. 2. May be decreased to no less than 5,000 passes when shown on the plans. 3. May be decreased to no less than 10,000 passes when shown on the plans. 4.4.2. Job-Mix Formula Approval.The JMF is the combined aggregate gradation, design level,and target asphalt percentage used to establish target values for hot-mix production.JMF1 is the original laboratory mixture design used to produce the trial batch.When WMA is used,JMF1 may be designed and submitted to the Engineer without including the WMA additive,foaming process,or compaction aid.When WMA or a compaction aid is used,document the additive or process used and recommended rate in the JMF1 submittal.The Engineer and the Contractor will verify JMF1 based on plant-produced mixture from the trial batch, unless otherwise approved.The Engineer may accept an existing mixture design previously used on a Department project and may waive the trial batch to verify JMF1.The Department may require the Contractor to reimburse the Department for verification tests if more than two trial batches per design are required. 4.4.2.1. Contractor's Responsibilities. 4.4.2.1.1. Providing Superpave Gyratory Compactor. Provide an SGC in accordance with Item 504, "Field Office and Laboratory,"and make the SGC available to the Engineer for use in molding production samples. 4.4.2.1.2. Gyratory Compactor Correlation Factors. Use Tex-206-F, Part II,to perform a gyratory compactor correlation when the Engineer uses a different SGC.Apply the correlation factor to all subsequent production test results. 4.4.2.1.3. Submitting JMF1. Furnish a mix design report(JMF1)with representative samples of all component materials and request approval to produce the trial batch.Provide approximately 25 lb.of the design mixture if opting to have the Department perform the Hamburg wheel test on the laboratory mixture,and request that the Department perform the test. 4.4.2.1.4. Supplying Aggregates. Provide approximately 40 lb.of each aggregate stockpile unless otherwise directed. 4.4.2.1.5. Supplying Asphalt.Provide at least 1 gal.of the asphalt material and enough quantities of any additives proposed for use. City Project No:26122 Issue For Bids TX-341-12 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation 4.4.2.1.6. Ignition Oven Correction Factors. Notify the Engineer before performing Tex-236-F, Part II.Allow the Engineer to witness the mixing of ignition oven correction factor sample. Determine the aggregate and asphalt correction factors from the ignition oven in accordance with Tex-236-F, Part II. If the Engineer witnesses the mixing of the ignition oven correction factor samples, provide the Engineer with identically prepared samples of the mixtures before the trial batch production, including all additives(except water),and blank samples used to determine the correction factors for the ignition oven used for QA testing during production. Correction factors established from a previously approved mixture design may be used for the current mixture design if the mixture design and ignition oven are the same as previously used, unless otherwise directed.Correction factors must be performed every 12 mo. 4.4.2.1.7. Boil Test.When shown on the plans,perform the test and retain the tested sample from Tex-530-C until completion of the project or as directed. Use this sample for comparison purposes during production. 4.4.2.1.8. Trial Batch Production. Provide a plant-produced trial batch upon receiving conditional approval of JMF1 and authorization to produce a trial batch. If applicable,include the WMA additive,foaming process,or compaction aid for verification testing of JMF1 and development of JMF2. Produce a trial batch mixture that meets the requirements shown in Tables 4,5,and 11.The Engineer may accept test results from recent production of the same mixture instead of a new trial batch. 4.4.2.1.9. Trial Batch Production Equipment. Use only equipment and materials proposed for use on the project to produce the trial batch. 4.4.2.1.10. Trial Batch Quantity. Produce enough quantity of the trial batch to ensure that the mixture meets the specification requirements. 4.4.2.1.11. Number of Trial Batches.Produce trial batches as necessary to obtain a mixture that meets the specification requirements. 4.4.2.1.12. Trial Batch Sampling.Obtain a representative sample of the trial batch and split it into three equal portions in accordance with Tex-222-F. Label these portions as"Contractor,""Engineer,"and"Referee."Deliver samples to the appropriate laboratory as directed. 4.4.2.1.13. Trial Batch Testing.Test the trial batch to ensure the mixture produced using the proposed JMF1 meets the mixture requirements shown in Table 11. Ensure the trial batch mixture is also in compliance with the Hamburg wheel requirement shown in Table 10. Use a Department-approved laboratory listed on the MPL to perform the Hamburg wheel test on the trial batch mixture,or request that the Department perform the Hamburg wheel test. Provide approximately 25 lb.of the trial batch mixture if opting to have the Department perform the Hamburg wheel test,and request that the Department perform the test. Upon receiving the sample from the Contractor,the Engineer will be allowed 10 working days to provide the Contractor with Hamburg wheel test results on the trial batch. Provide the Engineer with a copy of the trial batch test results. 4.4.2.1.14. Development of JMF2.After the Engineer grants full approval of JMF1,evaluate the trial batch test results, determine the optimum mixture proportions,and submit as JMF2.Adjust the asphalt binder content or gradation to achieve the specified target laboratory-molded density.The asphalt binder content established for JMF2 is not required to be within any tolerance of the optimum asphalt binder content established for JMF1; however, mixture produced using JMF2 must meet the VMA requirements for production shown in Table 8. If the optimum asphalt binder content for JMF2 is more than 0.5%lower than the optimum asphalt binder content for JMF1,the Engineer may perform or require the Contractor to perform Tex-226-F on Lot 1 production to confirm the indirect tensile strength does not exceed 200 psi.Verify that JMF2 meets the mixture requirements shown in Table 4 and Table 5. City Project No:26122 Issue For Bids TX-341-13 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation 4.4.2.1.15. Mixture Production. Use JMF2 to produce Lot 1 in accordance with Section 341.4.9.3.1.1.,"Lot 1 Placement,"after receiving approval for JMF2 and a passing Hamburg wheel result on the trial batch from a laboratory listed on the MPL. Once JMF2 is approved,and without receiving the results from the Department's Hamburg wheel test on the trial batch,the Contractor may proceed to Lot 1 production at their own risk. Notify the Engineer if electing to proceed without Hamburg wheel test results from the trial batch. Note that the Engineer may require up to the entire sublot of any mixture failing the Hamburg wheel test to be removed and replaced at the Contractor's expense. 4.4.2.1.16. Development of JMF3.Evaluate the test results from Lot 1,determine the optimum mixture proportions,and submit as JMF3 for use in Lot 2. 4.4.2.1.17. JMF Adjustments.If JMF adjustments are necessary to achieve the specified requirements, make the adjustments before beginning a new lot.The adjusted JMF must: ■ be provided to the Engineer in writing before the start of a new lot, ■ be numbered in sequence to the previous JMF, ■ meet the mixture requirements in accordance with Table 4 and Table 5, ■ meet the master gradation limits in accordance with Table 8,and ■ be within the operational tolerances of JMF2 in accordance with Table 11. 4.4.2.1.18. Requesting Referee Testing. Use referee testing, if needed, in accordance with Section 341.4.9.1., "Referee Testing,"to resolve testing differences with the Engineer. Table 11 0 erational Tolerances Allowable Difference Allowable Difference Allowable Difference Description Test Method Between Trial Batch from Current JMF between Contractor and JMF1 Target Target and Engineer' Individual%retained for#8 sieve and larger ±5.02,3 ±5.0 Individual%retained for sieves smaller than#8 Tex-200 F Must Within and larger than#200 or Master Grading Limits ±3.02,3 ±3.0 Tex-236-F in Table 8 passing the#200 sieve ±2.02,3 ±1.6 Asphalt binder content,% Tex-236-F ±0.5 ±0.33 ±0.3 Laboratory-molded density,% ±1.0 ±1.0 ±1.0 In-place air voids,% Tex-207-F N/A N/A ±1.0 Laboratory-molded bulkspecific gravity N/A N/A ±0.020 VMA,%,min Tex-204-F Note 4 Note 4 N/A Theoretical maximumspecific Ricegravity Tex-227-F N/A N/A ±0.020 1. Contractor may request referee testing only when values exceed these tolerances. 2. When within these tolerances,mixture production gradations may fall outside the master grading limits;however,the%passing the #200 will be considered out of tolerance when outside the master grading limits. 3. Only applies to mixture produced for Lot 1 and higher. 4. Test and verify that Table 8 requirements are met. 4.4.2.2. Engineer's Responsibilities. 4.4.2.2.1. Superpave Gyratory Compactor.The Engineer will use a Department SGC, calibrated in accordance with Tex-241-F,to mold samples for laboratory mixture design verification. For molding trial batch and production specimens,the Engineer will use the Contractor-provided SGC at the field laboratory or provide and use a Department SGC at an alternate location. 4.4.2.2.2. Conditional Approval of JMF1 and Authorizing Trial Batch.The Engineer will review and verify conformance with the following information within 2 working days of receipt: ■ the Contractor's mix design report(JMF1); City Project No:26122 Issue For Bids TX-341-14 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation ■ the Contractor-provided Hamburg wheel test results; ■ all required materials including aggregates,asphalt,additives,and recycled materials;and ■ the mixture specifications. The Engineer will grant the Contractor conditional approval of JMF1 if the information provided on the paper copy of JMF1 indicates that the Contractor's mixture design meets the specifications.When the Contractor does not provide Hamburg wheel test results with laboratory mixture design, 10 working days are allowed for conditional approval of JMF1.The Engineer will base full approval of JMF1 on the test results on mixture from the trial batch. Unless waived,the Engineer will determine the Micro-Deval abrasion loss in accordance with Section 341.2.1.1.2.,"Micro-Deval Abrasion."If the Engineer's test results are pending after 2 working days, conditional approval of JMF1 will still be granted within 2 working days of receiving JMF1.When the Engineer's test results become available,they will be used for specification compliance. The Contractor is authorized to produce a trial batch after the Engineer grants conditional approval of JMF1. 4.4.2.2.3. Hamburg Wheel Testing of JMF1. If the Contractor requests the option to have the Department perform the Hamburg wheel test on the laboratory mixture,the Engineer will mold samples in accordance with Tex-242-F to verify compliance with the Hamburg wheel test requirement shown in Table 10. Upon receiving the sample from the Contractor,the Engineer will be allowed 10 working days to provide the Contractor with Hamburg wheel test results on the laboratory mixture design. 4.4.2.2.4. Ignition Oven Correction Factors.The Engineer will determine ignition oven correction factors by one of the following options. ■ Witness the mixing of ignition oven correction factor samples by the Contractor in accordance with Tex-236-F, Part III.The Engineer will use the identically prepared samples provided by the Contractor to determine the aggregate and asphalt correction factors for the ignition oven in accordance with Tex-236-F, Part II. ■ If the Engineer does not witness the mixing of ignition oven correction factor samples,the Engineer will prepare the samples to determine the aggregate and asphalt correction factors for the ignition oven in accordance with Tex-236-F, Part II. Notify the Contractor before performing Tex-236-F, Part II.Allow the Contractor to witness the Engineer performing Tex-236-F, Part II. Correction factors must be performed every 12 mo.to be used for QA testing during production. 4.4.2.2.5. Testing the Trial Batch.Within 1 full working day,the Engineer will sample and test the trial batch to ensure that the mixture meets the requirements shown in Table 11. If the Contractor requests the option to have the Department perform the Hamburg wheel test on the trial batch mixture,the Engineer will mold samples in accordance with Tex-242-F to verify compliance with the Hamburg wheel test requirement shown in Table 10. The Engineer will have the option to perform the following tests on the trial batch. ■ Tex-226-F,to verify that the indirect tensile strength meets the requirement shown in Table 9. ■ Tex-530-C,to retain and use for comparison purposes during production. 4.4.2.2.6. Full Approval of JMF1.The Engineer will grant full approval of JMF1 and authorize the Contractor to proceed with developing JMF2 if the Engineer's results for the trial batch meet the requirements shown in Tables 8,9,and 10.The Engineer will notify the Contractor that an additional trial batch is required if the trial batch does not meet these requirements. 4.4.2.2.7. Approval of JMF2.The Engineer will approve JMF2 within 1 working day if the mixture meets the requirements shown in Table 5 and Table 8. The asphalt binder content established for JMF2 is not required City Project No:26122 Issue For Bids TX-341-15 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation to be within any tolerance of the optimum asphalt binder content established for JMF1; however, mixture produced using JMF2 must meet the VMA requirements shown in Table 8. If the optimum asphalt binder content for JMF2 is more than 0.5%lower than the optimum asphalt binder content for JMF1,the Engineer may perform or require the Contractor to perform Tex-226-F on Lot 1 production to confirm the indirect tensile strength does not exceed 200 psi. 4.4.2.2.8. Approval of Lot 1 Production.The Engineer will authorize the Contractor to proceed with JMF2 for Lot 1 production after a passing Hamburg wheel test result on the trial batch is achieved from a laboratory listed on the MPL.The Contractor may proceed at their own risk with Lot 1 production without the results from the Hamburg wheel test on the trial batch. If the Department-approved laboratory's sample from the trial batch fails the Hamburg wheel test,the Engineer will suspend production until further Hamburg wheel tests meet the specified values.The Engineer may require up to the entire sublot of any mixture failing the Hamburg wheel test be removed and replaced at the Contractor's expense. 4.4.2.2.9. Approval of JMF3 and Subsequent JMF Changes.JMF3 and subsequent JMF changes are approved if they meet the mixture requirements shown in Table 4 and Table 5,and the master gradation limits shown in Table 8,and they are within the operational tolerances of JMF2 shown in Table 11.The addition of a WMA additive to facilitate mixing or as a compaction aid does not require a new laboratory mixture design or trial batch.Current JMF changes that exceed the operational tolerances of JMF2 in accordance with Table 11 may require a new laboratory mixture design,trial batch,or both. 4.5. Production Operations.Perform a new trial batch when the plant or plant location is changed.All source changes for asphalt will require a passing Hamburg wheel test result from a laboratory listed on the MPL. The Contractor may proceed at their own risk with Lot 1 production without the results from the Hamburg wheel test on the trial batch.All aggregate source changes will require a new laboratory mixture design and trial batch.Take corrective action and receive approval to proceed after any production suspension for noncompliance with the specification. Submit a new mix design and perform a new trial batch when the asphalt binder content of: ■ any RAP stockpile used in the mix is more than 0.5%higher than the value shown in the mixture design report,or ■ RAS stockpile used in the mix is more than 2.0%higher than the value shown in the mixture design report. 4.5.1. Storage and Heating of Materials. Do not heat the asphalt binder above the temperatures specified in Item 300,or outside the manufacturer's recommended values. Provide the Engineer with daily records of asphalt binder and HMA discharge temperatures(in legible and discernible increments)in accordance with Item 320,unless otherwise directed. Do not store mixture for a period long enough to affect the quality of the mixture, nor in any case longer than 12 hr. unless otherwise approved. 4.5.2. Mixing and Discharge of Materials. Notify the Engineer of the target discharge temperature and produce the mixture within 25°F of the target. Monitor the temperature of the material in the truck before shipping to ensure that it does not exceed the maximum production temperatures shown in Table 12.The Department will not pay for or allow placement of any mixture produced above the maximum production temperatures shown in Table 12. City Project No:26122 Issue For Bids TX-341-16 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation Table 12 Max Production Temperature High-Temperature Max Production Temperature Binder Grade' (°F) PG 64 3252 PG 70 3352 PG 76 3452 1. The high-temperature binder grade refers to the high- temperature grade of the virgin asphalt binder used to produce the mixture. 2. The Max production temperature of WMA is 275°F. Produce WMA within the target discharge temperature range of 215-275°F when WMA is required.Take corrective action anytime the discharge temperature of the WMA exceeds the target discharge range.The Engineer may suspend production operations if the Contractor's corrective action is not successful at controlling the production temperature within the target discharge range.Note that when WMA is produced, it may be necessary to adjust burners to ensure complete combustion such that no burner fuel residue remains in the mixture. Control the mixing time and temperature so that substantially all moisture is removed from the mixture before discharging from the plant.Determine the moisture content, if requested, by oven-drying in accordance with Tex-212-F, Part II,and verify that the mixture contains no more than 0.2%of moisture by weight. Obtain the sample immediately after discharging the mixture into the truck and perform the test promptly. 4.6. Hauling Operations.Clean all truck beds before use to ensure that mixture is not contaminated. Use a release agent listed on the MPL to coat the inside bed of the truck when necessary. Do not use diesel or any release agent not listed on the MPL. Use equipment for hauling as defined in Section 341.4.7.3.3.,"Hauling Equipment."Use other hauling equipment only when allowed. 4.7. Placement Operations.Collect haul tickets from each load of mixture delivered to the project and provide the Department's copy to the Engineer approximately every hour,or as directed. Use a handheld thermal camera or infrared thermometer,when a thermal imaging system is not used,to measure and record the internal temperature of the mixture as discharged from the truck or material transfer device(MTD)before or as the mix enters the paver. Measure the mixture temperature at a minimum frequency of one per ten trucks, or as approved. Include an approximate station number or Global Positioning System coordinates of the location where the temperature was taken on each ticket. Ensure the mixture meets the temperature requirements shown in Table 12. Calculate the daily yield and cumulative yield for the specified lift and provide to the Engineer at the end of paving operations for each day unless otherwise directed.The Engineer may suspend production if the Contractor fails to produce and provide haul tickets and yield calculations by the end of paving operations for each day. Prepare the surface by removing raised pavement markers and objectionable material such as moisture,dirt, sand, leaves,and other loose impediments from the surface before placing mixture. Remove vegetation from pavement edges. Place the mixture to meet the typical section requirements and produce a smooth,finished surface with a uniform appearance and texture. Offset longitudinal joints of successive courses of hot mix by at least 6 in. Place mixture so that longitudinal joints on the surface course coincide within 6 in.of lane lines, are not placed in the wheel path, or will not be covered with pavement markings,or as directed. Ensure that all finished surfaces will drain properly. Place the mixture at the rate or thickness shown on the plans.The Engineer will use the guidelines shown in Table 13 to determine the compacted lift thickness of each layer when multiple lifts are required.The thickness determined is based on the rate of 110 lb. per square yard for each inch of pavement, unless otherwise shown on the plans. City Project No:26122 Issue For Bids TX-341-17 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation Table 13 Compacted Lift Thickness and Re uired Core Height Mixture Compacted Lift Thickness Guidelines Min Untrimmed Core Type Min Max Height Eligible for Testing in. in. in. DG-B 2.50 5.00 1.75 DG-C 2.00 4.00 1.50 DG-D 1.50 3.00 1.25 DG-F 1.25 2.50 1.25 4.7.1. Weather Conditions. 4.7.1.1. When Using a Thermal Imaging System. Place mixture when the roadway surface is dry and the roadway surface temperature is at or above the temperatures shown in Table 14A, unless otherwise approved or as shown on the plans. Place mixtures only when weather conditions and moisture conditions of the roadway surface are suitable as determined by the Engineer. Provide output data from the thermal imaging system to demonstrate to the Engineer that no recurring severe thermal segregation exists in accordance with Section 341.4.7.3.1.2.,"Thermal Imaging System." Table 14A Min Pavement Surface Temperatures High-Temperature Min Pavement Surface Temperatures Binder Grade' Subsurface Layers Surface Layers PG 64 35 40 PG 70 452 502 PG 76 452 502 1. The high-temperature binder grade refers to the high-temperature grade of the virgin asphalt binder used to produce the mixture. 2. The Contractor may pave at temperatures 107 lower than these values when a chemical WMA additive is used as a compaction aid in the mixture or when using WMA. 4.7.1.2. When Not Using a Thermal Imaging System.When using a thermal camera instead of the thermal imaging system,place mixture when the roadway surface temperature is at or above the temperatures shown in Table 1413, unless otherwise approved or as shown on the plans. Measure the roadway surface temperature using a handheld thermal camera or infrared thermometer.The Engineer may allow mixture placement to begin before the roadway surface reaches the required temperature if conditions are such that the roadway surface will reach the required temperature within 2 hr.of beginning placement operations. Place mixtures only when weather conditions and moisture conditions of the roadway surface are suitable as determined by the Engineer. City Project No:26122 Issue For Bids TX-341-18 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation Table 14B Min Pavement Surface Temperatures High-Temperature Min Pavement Surface Temperatures Binder Grade' Subsurface Layers Surface Layers PG 64 45 50 PG 70 552 602 PG 76 1 602 602 1. The high-temperature binder grade refers to the high-temperature grade of the virgin asphalt binder used to produce the mixture. 2. The Contractor may pave at temperatures 10°F lower than these values when a chemical WMA additive is used as a compaction aid in the mixture,when using WMA,or when using a paving process with equipment that eliminates thermal segregation.In such cases,for each sublot and in the presence of the Engineer,use a handheld thermal camera operated in accordance with Tex-244-F to demonstrate to the satisfaction of the Engineer that the uncompacted mat has no more than 10°F of thermal segregation. 4.7.2. Tack Coat. 4.7.2.1. Application.Clean the surface before placing the tack coat.The Engineer will set the rate between 0.04 and 0.10 gal.of residual asphalt per square yard of surface area.Apply a uniform tack coat at the specified rate unless otherwise directed.Apply the tack coat in a uniform manner to avoid streaks and other irregular patterns.Apply the tack coat to all surfaces that will come in contact with the subsequent HMA placement, unless otherwise directed.Apply adequate overlap of the tack coat in the longitudinal direction during placement of the mat to ensure bond of adjacent mats, unless otherwise directed.Allow adequate time for emulsion to break completely before placing any material. Prevent splattering of tack coat when placed adjacent to curb,gutter,and structures. Do not dilute emulsified asphalts at the terminal, in the field,or at any other location before use,unless required in conformance with the manufacturer's recommendation for approved TRAIL product use, or when shown on the plans. 4.7.2.2. Sampling.The Engineer will obtain at least one sample of the tack coat binder per project per source in accordance with Tex-500-C, Part III,and test it to verify compliance with Item 300.The Engineer will notify the Contractor when the sampling will occur and will witness the collection of the sample from the asphalt distributor immediately before use. Label the can with the corresponding lot and sublot numbers, producer, producer facility location,grade,district,date sampled, all applicable bills of lading(if available),and project information,including highway and control-section-job(CSJ)number. For emulsions,the Engineer may test as often as necessary to ensure the residual of the emulsion is greater than or equal to the specification requirement in Item 300. 4.7.3. Lay-Down Operations.Use the placement temperatures shown in Table 15 to establish the minimum placement temperature of the mixture delivered to the paving operation. City Project No:26122 Issue For Bids TX-341-19 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation Table 15 Min Mixture Placement Temperature High-Temperature Min Placement Temperature2,3,4 Binder Grade' °F PG 64 260 PG 70 270 PG 76 280 1. The high-temperature binder grade refers to the high-temperature grade of the virgin asphalt binder used to produce the mixture. 2. The mixture temperature must be measured using a handheld thermal camera or infrared thermometer immediately before entering MTD or paver. 3. Min placement temperatures may be reduced 20°F if using a chemical WMA additive as a compaction aid,MTD with remixing capabilities,or paver hopper insert with remixing capabilities. 4. When using WMA,the minimum placement temperature is 215°F. 4.7.3.1. Thermal Profile.Use a handheld thermal camera or a thermal imaging system to obtain a continuous thermal profile in accordance with Tex-244-F.Thermal profiles are not applicable in areas described in Section 341.4.9.3.1.4.,"Miscellaneous Areas." 4.7.3.1.1. Thermal Segregation. 4.7.3.1.1.1. Moderate.Any areas that have a temperature differential greater than 25°F,but not exceeding 50°F. 4.7.3.1.1.2. Severe.Any areas that have a temperature differential greater than 507. 4.7.3.1.2. Thermal Imaging System. Review the output results when a thermal imaging system is used,and provide the automated report described in Tex-244-F to the Engineer daily,unless otherwise directed. Modify the paving process as necessary to eliminate any recurring(moderate or severe)thermal segregation identified by the thermal imaging system. The Engineer may suspend paving operations if the Contractor cannot successfully modify the paving process to eliminate recurring severe thermal segregation. Density profiles are not required and not applicable when using a thermal imaging system. Provide the Engineer with electronic copies of all daily data files that can be used with the thermal imaging system software to generate temperature profile plots daily or as requested. 4.7.3.1.3. Thermal Camera.Provide the Engineer with the thermal profile of every sublot within 1 working day of the completion of each lot.When requested by the Engineer, provide the thermal images generated using the thermal camera. Report the results of each thermal profile in accordance with Section 341.4.2.,"Reporting and Responsibilities."The Engineer will use a handheld thermal camera to obtain a thermal profile at least once per project. Take immediate corrective action to eliminate recurring moderate thermal segregation when a handheld thermal camera is used. Suspend operations and take immediate corrective action to eliminate severe thermal segregation unless otherwise directed.Resume operations when the Engineer determines that subsequent production will meet the requirements of this Section. No production or placement payment adjustments greater than 1.000 will be paid for any sublot that contains severe thermal segregation. Evaluate areas with severe thermal segregation by performing density profiles in accordance with Section 341.4.9.3.3.3.,"Segregation(Density Profile)." Remove and replace the material in any areas that have severe thermal segregation and a failing result for segregation(density profile), unless otherwise directed.The sublot in question may receive a production and placement payment adjustment greater than 1.000, if applicable,when the defective material is successfully removed and replaced. City Project No:26122 Issue For Bids TX-341-20 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation 4.7.3.2. Windrow Operations.Operate windrow pickup equipment so that when hot mix is placed in windrows, substantially all the mixture deposited on the roadbed is picked up and loaded into the paver. 4.7.3.3. Hauling Equipment. Use belly dump,live-bottom,or end dump trucks to haul and transfer mixture. Except for paving miscellaneous areas,end dump trucks are allowed only when used in conjunction with an MTD with remixing capability or when a thermal imaging system is used, unless otherwise approved. 4.7.3.4. Screed Heaters.Turn off screed heaters to prevent overheating of the mat if the paver stops for more than 5 min.The Engineer may evaluate the suspect area in accordance with Section 341.4.9.3.3.5.,"Recovered Asphalt Dynamic Shear Rheometer(DSR),"if the screed heater remains on for more than 5 min.while the paver is stopped. 4.8. Compaction.Compact the pavement uniformly to contain between 3.8%and 8.5%in-place air voids.Take immediate corrective action to bring the operation within 3.8%and 8.5%when the in-place air voids exceed the range of these tolerances.The Engineer will allow paving to resume when the proposed corrective action is likely to yield between 3.8%and 8.5%in-place air voids. Obtain cores in areas placed under exempt production,as directed,at locations determined by the Engineer. The Engineer may test these cores and suspend operations or require removal and replacement if the in-place air voids are less than 2.7%or more than 9.9%.Areas defined in Section 341.4.9.3.1.4., "Miscellaneous Areas,"are not subject to in-place air void determination. Furnish the type,size,and number of rollers necessary to ensure desired compaction. Use additional rollers as required to remove any roller marks. Use only water or an approved release agent on rollers,tamps,and other compaction equipment unless otherwise directed. Use the control strip method shown in Tex-207-F, Part IV,on the first day of production to establish the rolling pattern that will produce the desired in-place air voids, unless otherwise directed. Use tamps to thoroughly compact the edges of the pavement along curbs, headers,and similar structures and in locations that will not allow thorough compaction using rollers.The Engineer may require rolling using a trench roller on widened areas, in trenches,and in other limited areas. Complete all compaction operations using breakdown rollers before the pavement temperature drops below 180°F, unless otherwise allowed. Compaction using a pneumatic or light finish roller operated in static mode is allowed for pavement temperatures above 1607. Allow the compacted pavement to cool to 1607 or lower before opening to traffic, unless otherwise directed. Sprinkle the finished mat with water or limewater,when directed,to expedite opening the roadway to traffic. 4.9. Acceptance Plan.Payment adjustments for the material will be in accordance with Article 341.6., "Payment." Sample and test the hot mix on a lot and sublot basis.Suspend production if the production payment factor shown in Section 341.6.1.,"Production Payment Adjustment Factors,"or the placement payment factor shown in Section 341.6.2.,"Placement Payment Adjustment Factors,"for two consecutive lots is below 1.000. Resume production once test results or other information indicates to the satisfaction of the Engineer that the next material produced or placed will result in payment factors of at least 1.000. 4.9.1. Referee Testing.The Materials and Tests Division is the referee laboratory.The Contractor may request referee testing if a"remove and replace"condition is determined based on the Engineer's test results,or if the differences between Contractor and Engineer test results exceed the maximum allowable difference in accordance with Table 11 and the differences cannot be resolved.The Contractor may also request referee testing if the Engineer's test results require suspension of production and the Contractor's test results are within specification limits. Make the request within 5 working days after receiving test results and cores from City Project No:26122 Issue For Bids TX-341-21 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation the Engineer. Referee tests will be performed only on the sublot in question and only for the tests in question. Allow 10 working days from the time the referee laboratory receives the samples for test results to be reported.The Department may require the Contractor to reimburse the Department for referee tests if more than three referee tests per project are required and the Engineer's test results are closer to the referee test results than the Contractor's test results. The Materials and Tests Division will determine the laboratory-molded density based on the molded specific gravity and the maximum theoretical specific gravity of the referee sample.The in-place air voids will be determined based on the bulk specific gravity of the cores,as determined by the referee laboratory,and the Engineer's average maximum theoretical specific gravity for the lot. Except for"remove and replace" conditions, referee test results are final and will establish payment adjustment factors for the sublot in question.The Contractor may decline referee testing and accept the Engineer's test results when the placement payment adjustment factor for any sublot results in a"remove and replace"condition. Placement sublots subject to be removed and replaced will be further evaluated in accordance with Section 341.6.2.2., "Placement Sublots Subject to Removal and Replacement." 4.9.2. Production Acceptance. 4.9.2.1. Production Lot.A production lot consists of four equal sublots.The default quantity for Lot 1 is 1,000 ton; however,when requested by the Contractor,the Engineer may increase the quantity for Lot 1 to no more than 4,000 ton.The Engineer will select subsequent lot sizes based on the anticipated daily production such that approximately three—four sublots are produced each day.The lot size will be between 1,000 ton and 4,000 ton.The Engineer may change the lot size before the Contractor begins any lot. If the optimum asphalt binder content for JMF2 is more than 0.5%lower than the optimum asphalt binder content for JMF1,the Engineer may perform or require the Contractor to perform Tex-226-F on Lot 1 to confirm the indirect tensile strength does not exceed 200 psi.Take corrective action to bring the mixture within specification compliance if the indirect tensile strength exceeds 200 psi,unless otherwise directed. 4.9.2.1.1. Incomplete Production Lots.If a lot is begun but cannot be completed,such as on the last day of production or in other circumstances deemed appropriate,the Engineer may close the lot. Adjust the payment for the incomplete lot in accordance with Section 341.6.1.,"Production Payment Adjustment Factors."Close all lots within 5 working days unless otherwise allowed. 4.9.2.2. Production Sampling. 4.9.2.2.1. Mixture Sampling.The Engineer will perform or witness the sampling of production sublots from trucks at the plant in accordance with Tex-222-F The sampler will split each sample into three equal portions in accordance with Tex-200-F and label these portions as"Contractor,""Engineer,"and"Referee."The Engineer will perform or witness the sample splitting and take immediate possession of the samples labeled "Engineer"and"Referee."The Engineer will maintain the custody of the samples labeled"Engineer"and "Referee"until the Department's testing is completed. 4.9.2.2.1.1. Random Sample.At the beginning of the project,the Engineer will select random numbers for all production sublots.Determine sample locations in accordance with Tex-225-F.Take one sample for each sublot at the randomly selected location.The Engineer will perform or witness the sampling of production sublots. 4.9.2.2.1.2. Blind Sample. For one sublot per lot,the Engineer will sample,split,and test a"blind"production sample instead of the random sample collected by the Contractor.The location of the Engineer's"blind"sample will not be disclosed to the Contractor before sampling.The Engineer's"blind"sample may be randomly selected in accordance with Tex-225-F for any sublot or selected at the discretion of the Engineer.The Engineer may sample and test an additional blind sample when the random sampling process does not result in obtaining a sample. City Project No:26122 Issue For Bids TX-341-22 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation For one sublot per lot,the Contractor must obtain from the Engineer a"blind" production sample collected by the Engineer. If desired,the Contractor may witness the collection of blind samples.Test either the"blind"or the random sample; however, referee testing for the sublot(if applicable)will be based on a comparison of results from the"blind"sample. 4.9.2.2.2. Asphalt Binder Sampling.The Engineer will witness the Contractor obtain a 1-qt.sample of the asphalt binder for each lot of mixture produced.The Contractor will notify the Engineer when the sampling will occur. Obtain the sample at approximately the same time the mixture random sample is obtained. Sample from a port located immediately upstream from the mixing drum or pug mill and upstream from the introduction of any additives in accordance with Tex-500-C, Part 11.Label the can with the corresponding lot and sublot numbers,producer name,producer facility,grade, District,date sampled,all applicable bills of lading(if available),and project information,including highway and CSJ number.The Engineer will retain these samples for 1 yr.The Engineer may also obtain independent samples. If obtaining an independent asphalt binder sample and upon request of the Contractor,the Engineer will split a sample of the asphalt binder with the Contractor. At least once per project,the Engineer will collect split samples of each binder grade and source used.The Engineer will submit one split sample to the Materials and Tests Division to verify compliance with Item 300, and will retain the other split sample for 1 yr. 4.9.2.3. Production Testing.The Contractor and Engineer must perform production tests shown in Table 16.The Contractor has the option to verify the Engineer's test results on split samples provided by the Engineer. Determine compliance with operational tolerances shown in Table 11 for all sublots. Take immediate corrective action if the Engineer's laboratory-molded density on any sublot is less than 95.0%or greater than 97.0%to bring the mixture within these tolerances.The Engineer may suspend operations if the Contractor's corrective actions do not produce acceptable results.The Engineer will allow production to resume when the proposed corrective action is likely to yield acceptable results. The Engineer may allow alternate methods for determining the asphalt binder content and aggregate gradation if the aggregate mineralogy is such that Tex-236-F, Part I does not yield reliable results. Provide evidence that results from Tex-236-F, Part I are not reliable before requesting permission to use an alternate method unless otherwise directed. Use the applicable test procedure as directed if an alternate test method is allowed. City Project No:26122 Issue For Bids TX-341-23 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation Table 16 Production and Placement Testing Fre uenc Min Contractor Min Engineer Description Test Method Testing Testing Frequency Frequency Individual%retained on#8 sieve and larger Tex-200-F Individual%retained on sieves smaller than#8 or 1 per sublot 1 per 12 sublots' and larger than#200 %passing#200 sieve Tex 236 F Laboratory-molded density Laboratory-molded bulk specific gravity Tex-207-F _ 1 per sublot' In-place air voids VMA Tex-204-F Segregation(density profile) Tex-207-F,Part V 1 per sublot2 1 per project Longitudinal joint density Tex-207-F,Part VI 1 per sublot3 1 per project Moisture content Tex-212-F,Part II When directed 1 per project Theoretical maximum specific(Rice)gravity Tex-227-F — 1 per sublot' Asphalt binder content Tex-236-F 1 per sublot 1 per lot' Thermal profile Tex-244-F 1 per sublot2 Hamburg wheel test Tex-242-F — Deleterious in RAS4 Tex-217-F,Part III — Asphalt binder sampling and testing4,5 Tex-500-C,Part II — 1 per project Tack coat sampling and testing Tex-500-C,Part III — Boil tests Tex-530-C 1 per lot Shear bond strength test' Tex-249-F — 1. For production defined in Section 341.4.9.4.,"Exempt Production,"the Engineer will perform one test per day if 100 ton or more is produced.For exempt production,no testing is required when<100 ton is produced. 2. To be performed in the presence of the Engineer when not using the thermal imaging system,unless otherwise approved. 3. To be performed in the presence of the Engineer. 4. Testing performed by the Materials and Tests Division or designated laboratory. 5. Sampling performed by the Contractor.The Engineer will witness sampling and retain the samples for 1 yr. 6. When shown on the plans. 7. Testing performed by the Materials and Tests Division or District for informational purposes on a sample obtained by the Contractor within the first four lots of the project. 4.9.2.4. Operational Tolerances.Control the production process within the operational tolerances shown in Table 11.When production is suspended,the Engineer will allow production to resume when test results or other information indicates the next mixture produced will be within the operational tolerances. 4.9.2.4.1. Gradation.Suspend operation and take corrective action if any aggregate is retained on the maximum sieve size shown in Table 8.A sublot is defined as out of tolerance if either the Engineer's or the Contractor's test results are out of operational tolerance. Suspend production when test results for gradation exceed the operational tolerances shown in Table 11 for three consecutive sublots on the same sieve or four consecutive sublots on any sieve, unless otherwise directed.The consecutive sublots may be from more than one lot. 4.9.2.4.2. Asphalt Binder Content.A sublot is defined as out of operational tolerance if either the Engineer's or the Contractor's test results exceed the values shown in Table 11. No production or placement payment adjustments greater than 1.000 will be paid for any sublot that is out of operational tolerance for asphalt binder content.Suspend production and shipment of the mixture if the Engineer's or the Contractor's asphalt binder content deviates from the current JMF by more than 0.5%for any sublot. 4.9.2.4.3. VMAs.The Engineer will determine the VMA for every sublot. For sublots when the Engineer does not determine asphalt binder content,the Engineer will use the asphalt binder content results from QC testing performed by the Contractor to determine VMA. City Project No:26122 Issue For Bids TX-341-24 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation Take immediate corrective action if the VMA value for any sublot is less than the minimum VMA requirement for production shown in Table 8. Suspend production and shipment of the mixture if the Engineer's VMA results on two consecutive sublots are below the minimum VMA requirement for production shown in Table 8. No production or placement payment adjustments greater than 1.000 will be paid for any sublot that does not meet the minimum VMA requirement for production shown in Table 8 based on the Engineer's VMA determination. Suspend production and shipment of the mixture if the Engineer's VMA result is more than 0.5%below the minimum VMA requirement for production shown in Table 8. In addition to suspending production,the Engineer may require removal and replacement or may allow the sublot to be left in place without payment. 4.9.2.4.4. Hamburg Wheel Test.The Engineer may perform a Hamburg wheel test on plant-produced mixture anytime during production.Suspend production until further Hamburg wheel tests meet the specified values when the production samples fail the Hamburg wheel test criteria shown in Table 10.The Engineer may require up to the entire sublot of any mixture failing the Hamburg wheel test to be removed and replaced at the Contractor's expense. If the Department-approved laboratory's Hamburg wheel test on plant-produced mixture results in a"remove and replace"condition,the Contractor may request that the Materials and Tests Division determine the final disposition of the material in question by re-testing the failing material. 4.9.2.5. Individual Loads of Hot Mix.The Engineer may reject individual truckloads of hot mix.When a load of hot mix is rejected for reasons other than temperature,contamination,or excessive uncoated particles,the Contractor may request that the rejected load be tested. Make this request within 4 hr.of rejection.The Engineer will sample and test the mixture. If test results are within the operational tolerances shown in Table 11,payment will be made for the load. If test results are not within operational tolerances, no payment will be made for the load. 4.9.3. Placement Acceptance. 4.9.3.1. Placement Lot.A placement lot consists of four placement sublots.A placement sublot consists of the area placed during a production sublot. 4.9.3.1.1. Lot 1 Placement.Placement payment adjustments greater than 1.000 for Lot 1 will be in accordance with Section 341.6.2.,"Placement Payment Adjustment Factors"; however,no placement adjustment less than 1.000 will be assessed for any sublot placed in Lot 1 when the in-place air voids are greater than or equal to 2.7%and less than or equal to 9.9%. Remove and replace any sublot with in-place air voids less than 2.7% or greater than 9.9%. 4.9.3.1.2. Incomplete Placement Lots.An incomplete placement lot consists of the area placed as described in Section 341.4.9.2.1.1.,"Incomplete Production Lots,"excluding areas defined in Section 341.4.9.3.1.4., "Miscellaneous Areas."Placement sampling is required if the random sample plan for production resulted in a sample being obtained from an incomplete production sublot. 4.9.3.1.3. Shoulders, Ramps, Etc.Shoulders,ramps, intersections,acceleration lanes,deceleration lanes,and turn lanes are subject to in-place air void determination and payment adjustments unless shown on the plans as not eligible for in-place air void determination. Intersections may be considered miscellaneous areas when determined by the Engineer. 4.9.3.1.4. Miscellaneous Areas.Miscellaneous areas include areas that typically involve significant handwork or discontinuous paving operations,such as temporary detours,driveways, mailbox turnouts,crossovers, gores,spot level-up areas,pavement repair sections less than 300 ft.,and other similar areas.Temporary detours are subject to in-place air void determination when shown on the plans. Miscellaneous areas also include level-ups and thin overlays when the layer thickness shown on the plans is less than the minimum untrimmed core height eligible for testing in accordance with Table 13.The specified layer thickness is based City Project No:26122 Issue For Bids TX-341-25 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation on the rate of 110 lb.per square yard for each inch of pavement unless another rate is shown on the plans. When"Level Up"is listed as part of the bid item description,a payment adjustment factor of 1.000 will be assigned for all placement sublots as described in Article 341.6.,"Payment."Miscellaneous areas are not eligible for random placement sampling locations. Compact miscellaneous areas in accordance with Section 341.4.8.,"Compaction."Miscellaneous areas are not subject to in-place air void determination, thermal profiles testing,segregation(density profiles),or longitudinal joint density evaluations. 4.9.3.2. Placement Sampling.The Engineer will select random numbers for all placement sublots at the beginning of the project.The Engineer will provide the Contractor with the placement random numbers only immediately after the sublot is completed. Mark the roadway location at the completion of each sublot and record the station number. Determine one random sample location for each placement sublot in accordance with Tex-225-F.Adjust the random sample location by no more than necessary to achieve a 2-ft. clearance if the location is within 2 ft.of a joint or pavement edge. Shoulders, ramps, intersections,acceleration lanes,deceleration lanes,and turn lanes are always eligible for selection as a random sample location; however, if a random sample location falls on one of these areas and the area is shown on the plans as not subject to in-place air void determination,cores will not be taken for the sublot and a 1.000 pay factor will be assigned to that sublot. Provide the equipment and means to obtain and trim roadway cores onsite. Onsite is defined as in close proximity to where the cores are taken. Obtain the cores within 1 working day of the time the placement sublot is completed,unless otherwise approved. Obtain two 6-in.diameter cores side-by-side from within 1 ft. of the random location provided for the placement sublot. Mark the cores for identification, measure and record the untrimmed core height,and provide the information to the Engineer. The Engineer will witness the coring operation and measurement of the core thickness.Visually inspect each core and verify that the current paving layer is bonded to the underlying layer.Take corrective action if an adequate bond does not exist between the current and underlying layer to ensure that an adequate bond will be achieved during subsequent placement operations. Trim the cores immediately after obtaining them from the roadway in accordance with Tex-251-F if the core heights meet the minimum untrimmed value in accordance with Table 13.Trim the cores onsite in the presence of the Engineer. Use a permanent marker or paint pen to record the lot and sublot numbers on each core,as well as the designation as Core A or Core B.The Engineer may require additional information to be marked on the core and may choose to sign or initial the core.The Engineer will take custody of the cores immediately after witnessing the trimming of the cores and will retain custody of the cores until the Department's testing is completed. Before turning the trimmed cores over to the Engineer,the Contractor may wrap the trimmed cores or secure them in a manner that will reduce the risk of possible damage occurring during transport by the Engineer.After testing,the Engineer will return the cores to the Contractor. The Engineer may have the cores transported back to the Department's laboratory at the HMA plant via the Contractor's haul truck or other designated vehicle. In such cases where the cores will be out of the Engineer's possession during transport,the Engineer will use Department-provided security bags and the Protocol for Roadway Core Custody located on the Department's website to provide a secure means and process that protect the integrity of the cores during transport. Decide whether to include the pair of cores in the air void determination for that sublot if the core height before trimming is less than the minimum untrimmed value shown in Table 13.Trim the cores in accordance with Tex-251-F before delivering to the Engineer if electing to have the cores included in the air void determination. If electing to not have the cores included in air void determination, inform the Engineer of the decision,and deliver untrimmed cores to the Engineer.The placement pay factor for the sublot will be 1.000 if cores will not be included in air void determination. Instead of the Contractor trimming the cores onsite immediately after coring,the Engineer and the Contractor may mutually agree to have the trimming operations performed at an alternate location,such as a field laboratory or other similar location. In such cases,the Engineer will take possession of the cores immediately after they are obtained from the roadway and will retain custody of the cores until testing is completed. Either City Project No:26122 Issue For Bids TX-341-26 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation the Department or Contractor representative may perform trimming of the cores.The Engineer will witness all trimming operations in cases where the Contractor representative performs the trimming operation. Dry the core holes and tack the sides and bottom immediately after obtaining the cores. Fill the hole with the same type of mixture and properly compact the mixture. Repair core holes using other methods when approved. 4.9.3.3. Placement Testing.Perform placement tests in accordance with Table 16.After the Engineer returns the cores,the Contractor may test the cores to verify the Engineer's test results for in-place air voids.The allowable differences between the Contractor's and Engineer's test results are shown in Table 11. 4.9.3.3.1. In-Place Air Voids.The Engineer will measure in-place air voids in accordance with Tex-207-F and Tex-227-F. Before drying to a constant weight,cores may be pre-dried using a CoreDry or similar vacuum device to remove excess moisture.The Engineer will average the values obtained for all sublots in the production lot to determine the theoretical maximum specific gravity.The Engineer will use the average air void content for in-place air voids. The Engineer will use the vacuum method to seal the core if required in accordance with Tex-207-F.The Engineer will use the test results from the unsealed core to determine the placement payment adjustment factor if the sealed core yields a higher specific gravity than the unsealed core.After determining the in-place air void content,the Engineer will return the cores and provide test results to the Contractor. 4.9.3.3.2. Informational Shear Bond Strength Testing.The Engineer will select one random sublot within the first four lots of the project for shear bond strength testing.Obtain full-depth cores in accordance with Tex-249-F unless the HMA is being placed directly on concrete pavement. Label the cores with lot and sublot numbers and provide to the Engineer. Inspector must use pertinent Department form to document the CSJ number, producer of the tack coat, mix type,and shot rate.The Engineer will ship the cores to the Materials and Tests Division or District laboratory for shear bond strength testing. Results from these tests will not be used for specification compliance. 4.9.3.3.3. Segregation(Density Profile).Test for segregation using density profiles in accordance with Tex-207-F, Part V. Density profiles are not required and are not applicable when using a thermal imaging system. Density profiles are not applicable in areas described in Section 341.4.9.3.1.4.,"Miscellaneous Areas." Perform at least one density profile per sublot. Perform additional density profiles when any of the following conditions occur,unless otherwise approved: ■ areas that are identified by either the Contractor or the Engineer with severe thermal segregation, ■ any visibly segregated areas that exist, ■ the paver stops due to lack of material being delivered to the paving operations and the temperature of the uncompacted mat before the initial breakdown rolling is less than the temperatures shown in Table 17. City Project No:26122 Issue For Bids TX-341-27 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation Table 17 Min Uncom acted Mat Temperature Requiring Segregation Profile' High-Temperature Min Temperature of Uncompacted Mat Allowed Binder Grade2 Before Initial Bre�aFkdown Rolling3,4,5 PG 64 <250 PG 70 <260 PG 76 <270 1. Applicable only to paver stops that occur due to lack of material being delivered to the paving operations and when not using a thermal imaging system. 2. The high-temperature binder grade refers to the high-temperature grade of the virgin asphalt binder used to produce the mixture. 3. The surface of the uncompacted mat must be measured using a handheld thermal camera or infrared thermometer. 4. Min uncompacted mat temperature requiring a segregation profile may be reduced 20°F if using a chemical WMA additive as a compaction aid, MTD with remixing capabilities,or paver hopper insert with remixing capabilities. 5. When using WMA,the Min uncompacted mat temperature requiring a segregation profile is 215°F. Provide the Engineer with the density profile of every sublot in the lot within 1 working day of the completion of each lot. Report the results of each density profile in accordance with Section 341.4.2.,"Reporting and Responsibilities." The density profile is considered failing if it exceeds the tolerances shown in Table 18.When a thermal imaging system is not used,the Engineer will measure the density profile at least once per project.The Engineer's density profile results will be used when available.The Engineer may require the Contractor to remove and replace the area in question if the area fails the density profile and has surface irregularities as defined in Section 341.4.9.3.3.6., "Irregularities."The sublot in question may receive a production and placement payment adjustment greater than 1.000, if applicable,when the defective material is successfully removed and replaced. Investigate density profile failures and take corrective actions during production and placement to eliminate the segregation.Suspend production if two consecutive density profiles fail unless otherwise approved. Resume production after the Engineer approves changes to production or placement methods. Table 18 Segregation(Density Profile Acceptance Criteria Max Allowable Max Allowable Mixture Type Density Range Density Range (highest to lowest,pcf) (average to lowest,pcQ DG-B 8.0 5.0 DG-C,DG-D,and DG-F 6.0 3.0 4.9.3.3.4. Longitudinal Joint Density. 4.9.3.3.4.1. Informational Tests.Perform joint density evaluations while establishing the rolling pattern and verify that the joint density is no more than 3.0 pcf below the density taken at or near the center of the mat.Adjust the rolling pattern, if needed,to achieve the desired joint density. Perform additional joint density evaluations,at least once per sublot, unless otherwise directed. 4.9.3.3.4.2. Record Tests. Perform a joint density evaluation for each sublot at each pavement edge that is or will become a longitudinal joint.Joint density evaluations are not applicable in areas described in Section 341.4.9.3.1.4.,"Miscellaneous Areas."Determine the joint density in accordance with Tex-207-F, Part VII. Record the joint density information and submit results on Department forms to the Engineer.The evaluation is considered failing if the joint density is more than 3.0 pcf below the density taken at the core City Project No:26122 Issue For Bids TX-341-28 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation random sample location and the correlated joint density is less than 90.0%.The Engineer will make independent joint density verification at least once per project and may make independent joint density verifications at the random sample locations.The Engineer's joint density test results will be used when available. Provide the Engineer with the joint density of every sublot in the lot within 1 working day of the completion of each lot. Report the results of each joint density in accordance with Section 341.4.2.,"Reporting and Responsibilities." Investigate joint density failures and take corrective actions during production and placement to improve the joint density.Suspend production if the evaluations on two consecutive sublots fail,unless otherwise approved. Resume production after the Engineer approves changes to production or placement methods. 4.9.3.3.5. Recovered Asphalt Dynamic Shear Rheometer(DSR).The Engineer may take production samples or cores from suspect areas of the project to determine recovered asphalt properties.Asphalt binders with an aging ratio greater than 3.5 do not meet the requirements for recovered asphalt properties and may be deemed defective when tested and evaluated by the Materials and Tests Division.The aging ratio is the DSR value of the extracted binder divided by the DSR value of the original unaged binder. Obtain DSR values in accordance with AASHTO T 315 at the specified high-temperature PG of the asphalt.The Engineer may require removal and replacement of the defective material at the Contractor's expense.The asphalt binder will be recovered for testing from production samples or cores in accordance with Tex-211-F. 4.9.3.3.6. Irregularities. Identify and correct irregularities,including segregation, rutting, raveling,flushing,fat spots, mat slippage, irregular color,irregular texture, roller marks,tears,gouges,streaks, uncoated aggregate particles,or broken aggregate particles.The Engineer may also identify irregularities,and in such cases,the Engineer will promptly notify the Contractor. If the Engineer determines that the irregularity will adversely affect pavement performance,the Engineer may require the Contractor to remove and replace(at the Contractor's expense)areas of the pavement that contain irregularities.The Engineer may also require the Contractor to remove and replace(at the Contractor's expense)areas where the mixture does not bond to the existing pavement. If irregularities are detected,the Engineer may require the Contractor to immediately suspend operations or may allow the Contractor to continue operations for no more than 1 day while the Contractor is taking appropriate corrective action. 4.9.4. Exempt Production.The mixture may be deemed as exempt production when mutually agreed upon between the Engineer and the Contractor,or when shown on the plans.Exempt production may be used for the following conditions. ■ Anticipated daily production is less than 500 ton. ■ Total production for the project is less than 5,000 ton. ■ Pavement repair sections are equal to or greater than 300 ft. For pavement repair sections less than 300 ft.,refer to Section 341.4.9.3.1.4.,"Miscellaneous Areas." Exempt production is not eligible for referee testing. For exempt production,the Contractor is relieved of all production and placement QC and QA sampling and testing requirements, except for coring operations when required by the Engineer.When mutually agreed upon between the Engineer and the Contractor, production sampling will be allowed at the point of delivery.When 100 ton or more per day is produced,the Engineer must perform acceptance tests for production and placement in accordance with Table 16. If the specification requirements listed below are met,the production and placement pay factors are 1.000: ■ produce, haul, place,and compact the mixture in compliance with the specification and as directed; ■ control mixture production to yield a laboratory-molded density that is within±1.0%of the target laboratory-molded density as tested by the Engineer; ■ compact the mixture in accordance with Section 341.4.8.,"Compaction;" City Project No:26122 Issue For Bids TX-341-29 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation ■ when a thermal imaging system is not used,the Engineer may perform segregation(density profiles) and thermal profiles in accordance with the specification;and ■ all other specification requirements. 4.9.5. Ride Quality.Measure ride quality in accordance with Item 585,"Ride Quality for Pavement Surfaces," unless otherwise shown on the plans. 5. MEASUREMENT 5.1. Dense-Graded HMA. Hot mix will be measured by the ton of composite hot mix,which includes asphalt, aggregate,and additives.Measure the weight on scales in accordance with Item 520,"Weighing and Measuring Equipment." 5.2. Tack Coat.Tack coat will be measured at the applied temperature by strapping the tank before and after road application and determining the net volume in gallons from the calibrated distributor.The Engineer will witness all strapping operations for volume determination.All tack, including emulsions,will be measured by the gallon applied. The Engineer may allow the use of a metering device to determine asphalt volume used and application rate if the device is accurate within 1.5%of the strapped volume. 6. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under Section 341.5.1.,"Measurement",will be paid for at the unit price bid for"Dense-Graded Hot-Mix Asphalt'of the mixture type,SAC,and binder specified.These prices are full compensation for surface preparation, materials, placement,equipment,labor,tools,and incidentals. The work performed and materials furnished in accordance with this Item and measured as provided under Section 341.5.2.,"Tack Coat,"will be paid for at the unit price bid for"Tack Coat'of the tack coat provided. These prices are full compensation for materials,placement,equipment,labor,tools,and incidentals. Payment adjustments will be applied as determined in accordance with this Item; however,a payment adjustment factor of 1.000 will be assigned for all placement sublots for level-ups only when"Level Up"is listed as part of the bid item description.A payment adjustment factor of 1.000 will be assigned to all production and placement sublots when"Exempt'is listed as part of the bid item description,and all testing requirements are met. Payment for each sublot, including applicable payment adjustments greater than 1.000,will be paid only for sublots when the Contractor supplies the Engineer with the required documentation for production and placement QC and QA,thermal profiles,segregation density profiles,and longitudinal joint densities in accordance with Section 341.4.2.,"Reporting and Responsibilities."When a thermal imaging system is used, documentation is not required for segregation density profiles on individual sublots; however,the thermal imaging system automated reports described in Tex-244-F are required. Trial batches will not be paid for unless they are included in pavement work approved by the Department. Payment adjustment for ride quality will be determined in accordance with Item 585. Payment will be made under: Tx-341-6.1 ASPHALT SURFACE COURSE(TYPE D)(6)—Per Ton City Project No:26122 Issue For Bids TX-341-30 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation 6.1. Production Payment Adjustment Factors.The production payment adjustment factor is based on the laboratory-molded density using the Engineer's test results.The bulk specific gravities of the samples from each sublot will be divided by the Engineer's maximum theoretical specific gravity for the sublot.The individual sample densities for the sublot will be averaged to determine the production payment adjustment factor in accordance with Table 19 for each sublot,using the deviation from the target laboratory-molded density in accordance with Table 9. The production payment adjustment factor for completed lots will be the average of the payment adjustment factors for the four sublots sampled within that lot. Table 19 Production Payment Adjustment Factors for Laboratory-Molded Density' Absolute Deviation from Production Payment Adjustment Factor Target Laboratory-Molded Density (Target Laboratory-Molded Density) 0.0 1.050 0.1 1.050 0.2 1.050 0.3 1.044 0.4 1.038 0.5 1.031 0.6 1.025 0.7 1.019 0.8 1.013 0.9 1.006 1.0 1.000 1.1 0.965 1.2 0.930 1.3 0.895 1.4 0.860 1.5 0.825 1.6 0.790 1.7 0.755 1.8 0.720 >1.8 Remove and replace 1. If the Engineer's laboratory-molded density on any sublot is<95.0%or>97.0%,take immediate corrective action to bring the mixture within these tolerances.The Engineer may suspend operations if the Contractor's corrective actions do not produce acceptable results.The Engineer will allow production to resume when the proposed corrective action is likely to yield acceptable results. 6.1.1. Payment for Incomplete Production Lots. Production payment adjustments for incomplete lots,described under Section 341.4.9.2.1.1.,"Incomplete Production Lots,"will be calculated using the average production payment factors from all sublots sampled. A production payment factor of 1.000 will be assigned to any lot when the random sampling plan did not result in collection of any samples within the first sublot. 6.1.2. Production Sublots Subject to Removal and Replacement. If after referee testing the laboratory-molded density for any sublot results in a"remove and replace"condition as shown in Table 19,the Engineer may require removal and replacement or may allow the sublot to be left in place without payment.The Engineer may also accept the sublot in accordance with Section 5.3.1.,"Acceptance of Defective or Unauthorized Work."Replacement material meeting the requirements of this Item will be paid for in accordance with this Section. 6.2. Placement Payment Adjustment Factors.The placement payment adjustment factor is based on in-place air voids using the Engineer's test results.The bulk specific gravities of the cores from each sublot will be divided by the Engineer's average maximum theoretical specific gravity for the lot.The individual core densities for the sublot will be averaged to determine the placement payment adjustment factor in accordance with Table 20 for each sublot that requires in-place air void measurement.A placement payment adjustment factor of 1.000 will be assigned to the entire sublot when the random sample location falls in an City Project No:26122 Issue For Bids TX-341-31 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation area shown on the plans as not subject to in-place air void determination.A placement payment adjustment factor of 1.000 will be assigned to quantities placed in areas described in Section 341.4.9.3.1.4., "Miscellaneous Areas."The placement payment adjustment factor for completed lots will be the average of the placement payment adjustment factors for up to four sublots within that lot. Table 20 Placement Payment Adjustment Factors for In-Place Air Voids In-Place Placement Pay In-Place Placement Payment Air Voids Adjustment Factor Air Voids Adjustment Factor <2.7 Remove and replace 6.4 1.042 2.7 0.710 6.5 1.040 2.8 0.740 6.6 1.038 2.9 0.770 6.7 1.036 3.0 0.800 6.8 1.034 3.1 0.830 6.9 1.032 3.2 0.860 7.0 1.030 3.3 0.890 7.1 1.028 3.4 0.920 7.2 1.026 3.5 0.950 7.3 1.024 3.6 0.980 7.4 1.022 3.7 0.998 7.5 1.020 3.8 1.002 7.6 1.018 3.9 1.006 7.7 1.016 4.0 1.010 7.8 1.014 4.1 1.014 7.9 1.012 4.2 1.018 8.0 1.010 4.3 1.022 8.1 1.008 4.4 1.026 8.2 1.006 4.5 1.030 8.3 1.004 4.6 1.034 8.4 1.002 4.7 1.038 8.5 1.000 4.8 1.042 8.6 0.998 4.9 1.046 8.7 0.996 5.0 1.050 8.8 0.994 5.1 1.050 8.9 0.992 5.2 1.050 9.0 0.990 5.3 1.050 9.1 0.960 5.4 1.050 9.2 0.930 5.5 1.050 9.3 0.900 5.6 1.050 9.4 0.870 5.7 1.050 9.5 0.840 5.8 1.050 9.6 0.810 5.9 1.050 9.7 0.780 6.0 1.050 9.8 0.750 6.1 1.048 9.9 0.720 6.2 1.046 >9.9 Remove and replace 6.3 1.044 - - 6.2.1. Payment for Incomplete Placement Lots. Payment adjustments for incomplete placement lots described under Section 341.4.9.3.1.2.,"Incomplete Placement Lots,"will be calculated using the average of the placement payment factors from all sublots sampled and sublots where the random location falls in an area shown on the plans as not eligible for in-place air void determination. If the random sampling plan results in production samples, but not in placement samples,the random core location and placement adjustment factor for the sublot will be determined by applying the placement random number to the length of the sublot placed. If the random sampling plan results in placement samples, but not in production samples, no placement adjustment factor will apply for that sublot placed. City Project No:26122 Issue For Bids TX-341-32 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation A placement payment adjustment factor of 1.000 will be assigned to any lot when the random sampling plan did not result in collection of any production samples. 6.2.2. Placement Sublots Subject to Removal and Replacement. If after referee testing the placement payment adjustment factor for any sublot results in a"remove and replace"condition as shown in Table 20,the Engineer will choose the location of two cores to be taken within 3 ft.of the original failing core location.The Contractor must obtain the cores in the presence of the Engineer.The Engineer will take immediate possession of the untrimmed cores and submit the untrimmed cores to the Materials and Tests Division, where they will be trimmed,if necessary,and tested for bulk specific gravity within 10 working days of receipt. The bulk specific gravity of each core from each sublot will be divided by the Engineer's average maximum theoretical specific gravity for the lot.The individual core densities for the sublot will be averaged to determine the new payment adjustment factor of the sublot in question. If the new payment adjustment factor is 0.720 or greater,the new payment adjustment factor will apply to that sublot. If the new payment adjustment factor is less than 0.720, no payment will be made for the sublot. Remove and replace the failing sublot,or the Engineer may allow the sublot to be left in place without payment.The Engineer may also accept the sublot in accordance with Section 5.3.1.,"Acceptance of Defective or Unauthorized Work." Replacement material meeting the requirements of this Item will be paid for in accordance with this Section. 6.3. Total Adjusted Pay(TAP)Calculation.TAP will be based on the applicable payment adjustment factors for production and placement for each lot. TAP=(A+B)/2 where: A=Bid price x production lot quantity x average payment adjustment factor for the production lot B=Bid price x placement lot quantity x average payment adjustment factor for the placement lot+(bid price x quantity placed in miscellaneous areas x 1.000) Production lot quantity=Quantity actually placed-quantity left in place without payment Placement lot quantity=Quantity actually placed-quantity left in place without payment-quantity placed in miscellaneous areas City Project No:26122 Issue For Bids TX-341-33 Garver Project No.2502477 Corpus Christi International Airport TX-341 Taxiway Echo Rehabilitation PAGE INTENTIONALLY LEFT BLANK City Project No:26122 Issue For Bids TX-341-34 Garver Project No.2502477 Corpus Christi International Airport TX-462 Taxiway Echo Rehabilitation Item 462 Texas Concrete Box Culverts and Drains !)eanspor t of Transportation 1. DESCRIPTION Furnish,construct,and install concrete box culverts and drains. 2. MATERIALS 2.1. General.Furnish materials in accordance with the following. ■ Item 420,"Concrete Substructures" ■ Item 421,"Hydraulic Cement Concrete" ■ Item 440,"Reinforcement for Concrete" ■ Item 464,"Reinforced Concrete Pipe" Provide cast-in-place or precast,formed or machine-made,box culverts and drains. Use Class S concrete for top slabs of cast-in-place concrete culverts for culverts with overlay,and a one-to two-course surface treatment or a top slab that is the final riding surface, unless otherwise shown on the plans. Use Class C concrete for the rest of the culvert and for all other cast-in-place boxes.Culverts with fill do not require Class S concrete. Furnish material for precast formed and machine-made box culverts in accordance with DMS-7305, "Fabrication and Qualification Procedure for Multi-Project Fabrication Plants of Precast Concrete Drainage Structures." 2.2. Fabrication. 2.2.1. Cast-in-Place.Meet Item 420 and Item 422,"Concrete Superstructures." 2.2.2. Precast. Multi-project fabrication plants,as defined in DMS-73051 for precast formed and machine-made box culverts must be approved in accordance with DMS-7305.The Materials and Tests Division maintains a list of approved multi-project precast box culvert fabrication plants on the Department's MPL. Fabricate precast boxes in accordance with DMS-7305. 2.3. Testing. 2.3.1. Cast-in-Place.Provide test specimens that meet Item 421. 2.3.2. Precast. Make,cure,and test compressive test specimens for precast formed and machine-made box culverts in accordance with DMS-7305. 2.3.3. Testing Equipment.The producer must furnish all equipment required for testing concrete for boxes produced in a precast plant. 2.4. Lifting Holes.Provide no more than four lifting holes in each section for precast boxes. Lifting holes may be cast,cut into fresh concrete after form removal,or drilled. Provide lifting holes large enough for adequate lifting devices based on the size and weight of the box section. Use lifting holes no larger than 3 in. in diameter.Cut no more than 5 in. in any direction of reinforcement per layer for lifting holes. 2.5. Marking.Clearly mark each precast unit with the following: City Project No:26122 Issue For Bids TX-462-1 Garver Project No.2502477 Corpus Christi International Airport TX-462 Taxiway Echo Rehabilitation ■ name or trademark of fabricator and plant location, ■ ASTM designation and product designation(when applicable), ■ date of manufacture, ■ box size, ■ minimum and maximum fill heights, ■ designation"TV for precast units fabricated in accordance with DMS-7305, ■ fabricator's designated approval stamp for each approved unit, ■ designation"SR"for boxes meeting sulfate-resistant concrete plan requirements(when applicable),and ■ precast drainage structures used forjacking and boring(when applicable). Mark one end of each box section,for boxes without lifting holes,on the inside and outside walls to indicate the top or bottom as it will be installed. Indent markings into the box section or paint them on each box with waterproof paint. 2.6. Tolerances.Ensure precast sections meet the permissible variations listed in ASTM C1577. Ensure that the sides of a section at each end do not vary from being perpendicular to the top and bottom by more than 1/2 in.when measured diagonally between opposite interior corners. Deviations from this tolerance will be acceptable if the sections can be fitted at the plant and the joint opening at any point does not exceed 1 in.Use match-marks for proper installation on sections that have been accepted in this manner. Ensure wall and slab thicknesses are not less than shown on the plans except for occasional deficiencies not greater than 3/16 in.or 5%,whichever is greater. If proper jointing is not affected,thicknesses in excess of plan requirements are acceptable. 2.6.1. Boxes for Jacking Operations.Use boxes for jacking operations as defined in Item 476,"Jacking, Boring, or Tunneling Pipe or Box,"meeting the following additional requirements: ■ the box ends must be square such that no point deviates more than 3/8 in.from a plane placed on the end of the box that is perpendicular to the box sides, ■ the slab and wall thicknesses must not be less than specified on the plans and must not exceed the specified thickness by more than 1/2 in.,and ■ variations in laying lengths of two opposite surfaces of the box must not exceed 1/4 in. 2.7. Defects and Repair.Repair precast boxes in accordance with the DMS-7305 Annex. Precast boxes may be rejected for any of the conditions stated in this Annex. 2.8. Storage and Shipment.Store precast sections on a level surface. Do not place any load on the sections until design strength is reached and curing is complete. Store and ship precast boxes in accordance with DMS-7305. 3. CONSTRUCTION 3.1. Excavation,Shaping, Bedding,and Backfill. Excavate,shape,bed,and backfill in accordance with Item 400,"Excavation and Backfill for Structures,"except where jacking,boring,or tunneling methods are shown on the plans or permitted.Jack,bore,or tunnel in accordance with Item 476. Immediate backfilling is permitted for all box structures where joints consist of materials other than mortar.Take precautions in placing and compacting the backfill to avoid any movement of the boxes or damage to the joints. Remove and replace boxes damaged by the Contractor at no expense to the Department. 3.2. Placement of Boxes. Place the box sections as shown on the plans or as directed when precast boxes are used to form multiple barrel structures. Place material to be used between barrels as shown on the plans or as directed.Start the laying of boxes on the bedding at the outlet end and proceed toward the inlet end with City Project No:26122 Issue For Bids TX-462-2 Garver Project No.2502477 Corpus Christi International Airport TX-462 Taxiway Echo Rehabilitation the abutting sections properly matched, unless otherwise authorized. Fit, match,and lay the boxes to form a smooth, uniform conduit true to the established lines and grades. Lower the box sections into the trench,for trench installations,without damaging the box or disturbing the bedding and the sides of the trench.Carefully clean the ends of the box before it is placed. Prevent earthen or bedding material from entering the box as it is laid. Remove and re-lay,without extra compensation, boxes that are not in alignment or show excessive settlement after laying. Form and place cast-in-place boxes in accordance with Item 420. 3.3. Jointing. Use any of the jointing materials in accordance with the joint requirements specified in Item 464, unless otherwise shown on the plans. Box joints for rubber gasketed material maybe substituted for tongue and groove joints, provided they meet the requirements of ASTM C1677 for design of the joints and permissible variations in dimensions. 3.4. Connections and Stub Ends. Make connections of boxes to existing boxes, pipes,drains,or drain appurtenances as shown on the plans. Mortar or concrete the bottom of existing structures if necessary to eliminate any drainage pockets created by the connections.Connect boxes to any required headwalls, wingwalls,safety end treatments or riprap,or other structures as shown on the plans or as directed. Repair any damage to the existing structure resulting from making the connections. Finish stub ends for connections to future work not shown on the plans by installing watertight plugs into the free end of the box. Fill lifting holes with mortar or concrete and cure for precast boxes.Precast concrete or mortar plugs may be used. 3.5. Extending. Break back and extend existing culverts in accordance with Section 420.4.8.,"Extending Existing Substructures,"and Section 422.4.5.,"Extending Existing Slabs,"as applicable. 4. MEASUREMENT This Item will be measured by the foot. Measurement will be made between the ends of the culvert or drain along the flow line, not including safety end treatments.Safety end treatments will be measured in accordance with Item 467,"Safety End Treatment."Measurement of spurs,branches,or new connection box section will be made from the intersection of the flow line with the outside surface of the structure into which it connects.Where inlets, headwalls,wingwalls,catch basins,manholes,junction chambers,or other structures are included in lines of culverts or drains,the length of box section tying into the structure wall will be included for measurement, but no other portion of the structure length or width will be included. The measured length of multiple barrel structures will be the sum of the lengths of the barrels. This is a plans quantity measurement Item.The quantity to be paid is the quantity shown in the proposal, unless modified by Article 9.2.,"Plans Quantity Measurement."Additional measurements or calculations will be made if adjustments of quantities are required. 5. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement"will be paid for at the unit price bid for"Concrete Box Culvert"of the size specified.This price is full compensation for constructing,furnishing,and transporting sections;preparation and shaping of the bed;backfill material between box sections;jointing of sections;jointing material;cutting of sections on skew or slope;connections to new or existing structures;breaking back, removing,and disposing of portions of the existing structure and replacing portions of the existing structure as required to make connections;concrete and reinforcing steel;and equipment,labor, materials,tools,and incidentals. Protection methods for excavations greater than 5 ft.deep will be measured and paid for as required under Item 402,"Trench Excavation Protection,"or Item 403,"Temporary Special Shoring."Excavation,shaping, bedding,and backfill will be paid for in accordance with Item 400.When jacking,boring,or tunneling is used at the Contractor's option, payment will be made under this Item.When jacking, boring,or tunneling is City Project No:26122 Issue For Bids TX-462-3 Garver Project No.2502477 Corpus Christi International Airport TX-462 Taxiway Echo Rehabilitation required, payment will be made under Item 476. Payment will be made under: Tx-462-5.15'X X REINFORCED CONCRETE BOX CULVERT—Per Linear Foot City Project No:26122 Issue For Bids TX-462-4 Garver Project No.2502477 Corpus Christi International Airport TX-467 Taxiway Echo Rehabilitation Item 467 7� Safety End Treatment DepartTexasment of Transportation 1. DESCRIPTION Furnish,construct,and install safety end treatments for drainage structures,or install or replace pipe runners or pipe runner assemblies on existing drainage structures. 2. MATERIALS 2.1. General. Furnish materials in accordance with the following. ■ Item 420,"Concrete Substructures," ■ Item 421,"Hydraulic Cement Concrete," ■ Item 432,"Riprap," ■ Item 440,"Reinforcement for Concrete," ■ Item 442,"Metal for Structures," ■ Item 445,"Galvanizing," ■ Item 460,"Corrugated Metal Pipe,"and ■ Item 464,"Reinforced Concrete Pipe." Use Class C concrete for cast-in-place and precast concrete units unless otherwise shown on the plans. Furnish cast-in-place or precast safety end treatments unless otherwise shown on the plans. Furnish Class B concrete for concrete riprap unless otherwise shown on the plans. Provide galvanized steel for prefabricated metal end sections in accordance with Item 460,"Corrugated Metal Pipe." Furnish pipe runners in accordance with the following: ■ ASTM A1085; ■ ASTM A53,Type E or S, Grade B; ■ ASTM A500, Grade B;or ■ API 5L,Grade X42. Furnish plates and angles in accordance with ASTM A36. Furnish nuts and bolts in accordance with ASTM A307. Galvanize pipes, plates,angles, nuts,and bolts in accordance with Item 445,"Galvanizing." 2.2. Fabrication. Fabricate cast-in-place concrete units and precast units in accordance with Item 420, "Concrete Substructures."Provide either prefabricated metal end sections or mitered CMP when specified for the pipe structure unless otherwise shown on the plans. Provide one of the following when reinforced concrete pipe(RCP)is specified for the pipe structure, unless otherwise shown on the plans: ■ mitered RCP or ■ precast safety end treatment(SET)units. Provide riprap only if the plans specifically require it for this alternative. 2.2.1. SET Types. 2.2.1.1. Type I. Provide Type I SET consisting of reinforced concrete headwalls or wingwalls and pipe runners in accordance with the details shown on the plans when required. City Project No:26122 Issue For Bids TX-467-1 Garver Project No.2502477 Corpus Christi International Airport TX-467 Taxiway Echo Rehabilitation 2.2.1.2. Type II. Provide Type II SET in accordance with the details shown on the plans consisting of the following: ■ CMP or RCP mitered to the proper slope,concrete riprap and pipe runners,when required; ■ prefabricated metal end sections,concrete riprap and pipe runners,when required;or ■ precast SET units, concrete riprap,when required,and pipe runners,when required. 2.2.2. Lifting Holes.Provide no more than 4 lifting holes in each section for precast units. Lifting holes may be cast,cut into fresh concrete after form removal,or drilled. Provide lifting holes large enough for adequate lifting devices based on the size and weight of the section.The maximum hole diameter is 3 in.at the inside surface of the wall and 4 in.at the outside surface. Cut no more than 1 longitudinal wire or 2 circumferential wires per layer of reinforcing steel when locating lift holes. Repair spalled areas around lifting holes. 2.2.3. Marking.Clearly mark the following on each precast unit, mitered CMP, mitered RCP,or metal end section before shipment from the casting or fabrication yard: ■ the date of manufacture, ■ the name or trademark of the manufacturer,and ■ the type and size designation. 2.2.4. Storage and Shipment.Store precast units on a level surface. Do not place any loads on precast units until the design strength is reached. Do not ship units until design strength requirements have been met. 2.2.5. Causes for Rejection.Precast units may be rejected for not meeting any one of the specification requirements. Individual units may also be rejected for fractures or cracks passing through the wall or surface defects indicating honeycombed or open texture surfaces.Remove rejected units from the project and replace with acceptable units meeting the requirements of this Item. 2.2.6. Defects and Repairs.Occasional imperfections in manufacture or accidental damage sustained during handling may be repaired.The repaired units will be acceptable if they conform to the requirements of this Item and the repairs are sound and properly finished and cured in conformance with pertinent specifications. Repair damaged galvanizing in accordance with Section 445.3.5., "Repairs." 3. CONSTRUCTION 3.1. General. Remove portions of existing structures in accordance with Section 420.4.8.,"Extending Existing Substructures."Drill,dowel, and grout in accordance with Item 420,"Concrete Substructures."Furnish concrete riprap in accordance with Item 432,"Riprap." Provide riprap on all prefabricated metal end sections. 3.2. Excavation,Shaping, Bedding,and Backfill. Excavate,shape,bed,and backfill in accordance with Item 400,"Excavation and Backfill for Structures."Take special precautions in placing and compacting the backfill to avoid any movement or damage to the units.Bed precast units on foundations of firm and stable material accurately shaped to conform to the bases of the units. 3.3. Placement of Precast Units. Provide adequate means to lift and place the precast units. Fill lifting holes with mortar or concrete and cure. Precast concrete or mortar plugs may be used. 3.4. Connections.Make connections to new or existing structures in accordance with the details shown on the plans. Furnish jointing material in accordance with Item 464,"Reinforced Concrete Pipe." Also remove a length of the existing pipe from the headwall to the joint when removing existing headwalls as shown on the plans or as approved. Re-lay the removed pipe if approved,or furnish and lay a length of new pipe. City Project No:26122 Issue For Bids TX-467-2 Garver Project No.2502477 Corpus Christi International Airport TX-467 Taxiway Echo Rehabilitation 3.5. Install or Replace Pipe Runners or Assemblies. Install or replace individual pipe runners or pipe runner assemblies on existing drainage structures as indicated on the plans. 4. MEASUREMENT SETs of all types will be measured by each barrel of each structure end. Pipe runners or pipe runner assemblies installed or replaced on existing structure will be measured by each installed or replaced on each structure end. 5. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement"will be paid for at the unit price bid for the various designations of"Safety End Treatment" specified as follows: ■ SET(Type 1)(Barrel Span)(Wall Height)(Slope, Horizontal:Vertical)(Orientation,Cross or Parallel) = SET(Type (Pipe Diameter or Design)(Slepe, Herizental:VBFt'Gal) (GrientatiGn,Gnass er Parallel) = SET(Type (Pipe Diameter or D86igR)(Pipe Material) (SlGpe, Herizontal:Vert'Gal) (C)FieRtatien, Gress or SET( ipe Renner) SET(Dina Renner Assen*l.) For payment purposes,the wingwall heights of Type I SETs for box culverts will be rounded to the nearest foot. This price is full compensation for constructing,furnishing,transporting,and installing the end treatments; pipe runners,or pipe runner assemblies,connecting to existing structure; breaking back,removing and disposing of portions of the existing structure, removing and disposing of existng pipe runner or pipe runner assemblies,and replacing portions of the existing structure as required to make connections;excavation and backfill;furnishing concrete, reinforcing steel,corrugated metal pipe or reinforced concrete pipe,and pipe runners;and concrete riprap,nuts, bolts, plates,angles,equipment,labor,tools,and incidentals. The removal and re-laying of existing pipe or the furnishing of new pipe to replace existing pipe will not be paid for directly but will be considered subsidiary to this Item. The mitered length of CMP or RCP that is a part of the SET(Type 11)will not be paid for directly but will be considered subsidiary to this Item.The limits for payment for pipe will be as shown on the plans and paid for in accordance with the pertinent bid item. The limits of riprap to be included in the price bid for each SET will be shown on the plans.Any riprap placed beyond the limits shown will be paid in accordance with Item 432,"Riprap."Riprap between multiple precast SET units will be required as shown on the plans and is included in the price bid for SET. When precast SETs are provided as an option to mitered RCP,riprap aprons will not be required unless the plans specifically require riprap aprons for precast SET units.The plans will show the limits of the riprap to be included with the precast SET for payment. Payment will be made under.• Tx-467-5.1 5'X X PRECAST SAFETY END TREATMENT(TYPE SETB-CD)—Per Each City Project No:26122 Issue For Bids TX-467-3 Garver Project No.2502477 Corpus Christi International Airport TX-467 Taxiway Echo Rehabilitation Page Intentionally Left Blank City Project No:26122 Issue For Bids TX-467-4 Garver Project No.2502477 Corpus Christi International Airport TX-644 Taxiway Echo Rehabilitation Item 644 Texas Small Roadside Sign Assemblies !)epartment of Transportation 1. DESCRIPTION 1.1. Installation.Furnish,fabricate,and erect small roadside sign assemblies er bridge mGunted GlearanGe SigR assemblies consisting of the signs,sign supports,foundations(when required),and associated mounting hardware. RAInnatonn Rpdog;;tp.existing small roadsid sign assemblies Gr bridgB-mounted GlearanGe sign assemblies h and fiabdr-ate.material as required-. 1 2 Removal Remove existing small rA;;dqmdp sign assemblies or bridge-mounted GlearanGe sign assemblies. 2. MATERIALS Furnish all materials unless otherwise shown on the plans. Furnish only new materials. Furnish and fabricate materials in accordance with the following Items and as shown on the plans. ■ Item 421,"Hydraulic Cement Concrete" ■ Item 440,"Reinforcement for Concrete" ■ Item 441,"Steel Structures" ■ Item 442,"Metal for Structures" ■ Item 445,"Galvanizing" ■ Item 636,"Signs" ■ Item 656,"Foundations for Traffic Control Devices" Use galvanized steel,stainless steel,dichromate sealed aluminum, or other materials shown on the plans for pipe, bolts, nuts,washers, lock washers,screws,and other sign assembly hardware. When dissimilar metals are used,select or insulate metals to prevent corrosion. 3. CONSTRUCTION Construct foundations in accordance with Item 656. Plumb sign supports. Do not spring or rake posts to secure proper alignment. Use established safety practices when working near underground or overhead utilities.Consult the appropriate utility company before beginning work. 3.1. Fabrication.Fabricate sign supports in accordance with Item 441.Ensure all components fit properly. Verify the length of each post for each sign before fabrication to meet field conditions and sign-mounting heights shown on the plans. Hot-dip galvanize fabricated parts in accordance with Item 445. Punch or drill any holes in steel parts or members before galvanizing. Repair galvanizing for any steel part or member damaged during assembly, transit,or erection,or for any steel part or member welded,when permitted,after galvanizing. Perform all galvanizing repairs in accordance with Section 445.3.4.,"Repairs." 3.2. Installation.Locate and install sign supports as shown on the plans,unless directed to shift the sign supports within design guidelines to secure a more desirable location or avoid conflict with utilities and City Project No:26122 Issue For Bids TX-644-1 Garver Project No.2502477 Corpus Christi International Airport TX-644 Taxiway Echo Rehabilitation underground appurtenances. Stake sign support locations for verification by the Engineer. Install stub posts of the type,spacing,orientation,and projection shown on the plans. Remove and replace posts damaged during installation at the Contractor's expense. Connect the upper post sections to the stub post sections as shown on the plans.Torque connection bolts as shown on the plans. Attach signs to supports in conformance with the plans and pertinent Items. 3.3. ReloGatmon.Reuse the existing GigRs as required unless otherwise shewn en the plaRs. Furnish and iRstall new stub pests OA npemq fA_1_1nd_at'A_.A_9 for reeler.ated sign assemblies. EFeGt the new supperts on the ReW stub Remove existing foundations-;tn- be ahandened with Redian 644.3.4.,"Rerne 3.4. Removal. Remove abande,niedd r.Aenr.rietpe fel-indat'ons to 2 ft.below finished grade URIeSS otherwise shown an the plans.Cut off Andd namo 4e steel pretruding from the remaining GOnGrete._Rar_*fi11 the remaining hole with maternal equal on G9mpe6ition and density to the surrounding area.ReplaGe any surfaGing with llike material tA_ equivalent nnndi#inn 3.5. Handling and Storage.Handle and store existing signs or portions of signs removed so they are not damaged.Store all signs to be reused off the ground and in a vertical position until erected. Prevent any damage to the various sign assembly components. Replace any portion of the sign damaged by the Contractor designated for reuse or salvage, including messages removed. Store all new signs off the ground and in a vertical position until erected.Store new sheet aluminum substrate signs in a weatherproof building. Extruded aluminum substrate signs may be stored outdoors. Stockpile all removed sign components that will be reused or become the property of the Department at designated locations.Accept ownership of unsalvageable materials and dispose of them in conformance with federal,state,and local regulations. 3.6. Cleaning.Wash the entire sign after installation using a biodegradable cleaning solution acceptable to the sign face materials manufacturer to remove dirt,grease,oil smears,streaks,finger marks,and other foreign materials. 4. MEASUREMENT This Item will be measured as each small roadside assembly or bridge Mounted nlearanno Sinn assembly installed,removed,or relocated. 5. PAYMENT The work performed and materials furnished in accordance with this Item and measured as provided under "Measurement"will be paid for at the unit price bid for"Install Small Roadside Sign Assemblies"of the type specified,"Install Bridge-Mounted Clearance Sign Assemblies"of the type specified,"Relocate Small Roadside Sign Assemblies"of the type specified,"Relocate Bridge-Mounted Clearance Sign Assemblies"of the type specified,"Remove Small Roadside Sign Assemblies,"or"Remove Bridge-Mounted Clearance Sign Assemblies." 5.1. Installation.This price is full compensation for furnishing,fabricating,galvanizing,and erecting the supports; constructing foundations, including concrete(when required);furnishing complete signs,including sign connections and all hardware; attaching the signs to the supports; preparing and cleaning the signs;and materials,equipment, labor,tools,and incidentals. City Project No:26122 Issue For Bids TX-644-2 Garver Project No.2502477 Corpus Christi International Airport TX-644 Taxiway Echo Rehabilitation Payment will be made under: Tx-466-5.1 Stop Sign, Complete in Place(36 x36')—per Each 6.2. Relocation.This priGe is full Gompensation for removing existing sign assemblies and related materials; furnishing and installing new stub posts and new sign supports;constructing foundations,induding oonerete (when required);new hardware; reinstallation of signs; preparing and Gleaning the signs;salvaging; disposal of 1-ins.alvageable materials;removing existing foundations,baGkfilling,and surfaGe plaGement;and materials, 5 2 Removal This PF'Ge is fW11 GOMpensation for removing existing sign assembli 1; AAd related materials; salvaging;disposal of unsalvageable materials;removing existing foundations, baGkfilling,and surfaGe nlonomon+•and materials o on+ laber,teelc and innideRt l City Project No:26122 Issue For Bids TX-644-3 Garver Project No.2502477 Corpus Christi International Airport TX-644 Taxiway Echo Rehabilitation PAGE INTENTIONALLY LEFT BLANK City Project No:26122 Issue For Bids TX-644-4 Garver Project No.2502477 • GEOTECHNICAL ENGINEERING • MATERIALS ENGINEERING &TESTING • SOILS • ASPHALT • CONCRETE P e�9�ro Go�Qo� 9y �� GEOTECHNICAL PAVEMENT AND SUBSURFACE INVESTIGATION FOR THE PROPOSED RUNWAY AND TAXIWAY PAVEMENT REHABILITATION RUNWAY 13-31, PARALLEL TAXIWAY B AND ASSOCIATED TAXIWAY CORPUS CHRISTI INTERNATIONAL AIRPORT CORPUS CHRISTI, TEXAS RETL REPORT NUMBER: G121054 PREPARED FOR: GARVER, LLC 3755 SOUTH CAPITOL OF TEXAS HIGHWAY AUSTIN, TEXAS 78704 FEBRUARY 24, 2021 PREPARED BY: { ROCK ENGINEERING & TESTING LABORATORY, INC. 6817 LEOPARD STREET CORPUS CHRISTI, TEXAS 78409 P: (361) 883-4555; F: (361) 883-4711 TBPE FIRM NO. 2101 r y T _ 4.. El 4rTF. ' 0�P`�G rFS �G�� T/� • GEOTECHNICAL ENGINEERING • CONSTRUCTION MATERIALS ENGINEERING&TESTING '9q�. °Qe° • SOILS •ASPHALT•CONCRETE o'4Y W,a February 24, 2021 Garver, LLC 3755 South Capitol of Texas Highway Austin, Texas 78704 Attention: Mr. Derek Mayo, P.E. SUBJECT: SUBSURFACE INVESTIGATION, LABORATORY TESTING PROGRAM, AND GEOTECHNICAL DATA REPORT FOR THE PROPOSED RUNWAY AND TAXIWAY PAVEMENT REHABILITATION Runway 13-31, Parallel Taxiway B and Associated Taxiways Corpus Christi International Airport Corpus Christi, Texas RETL Job No. — G121054 Dear Mr. Mayo, In accordance with our agreement, we have conducted a subsurface investigation and laboratory testing program for the above referenced project. The results of this investigation are to be found in the accompanying geotechnical data report, one electronic copy of which is being transmitted for your records and for distribution to the project design team. Often, because of design and construction details that occur on a project, questions arise concerning soil conditions and Rock Engineering and Testing Laboratory, Inc. (RETL) (TBPE Firm No. 2101), would be pleased to address concerns related to our subsurface investigation and/or expand our services as requested during the pavement rehabilitation design and project implementation phases. RETL also has great interest in providing materials testing and observation services during the construction phase of this project. If you will advise us of the appropriate time to discuss these engineering services, we will be pleased to meet with you at your convenience. Sincerely, Mark C. Rock, P.E. Senior Consultant ROCK ENGINEERING & TESTING LABORATORY, INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office: 512.284.8022 Fax:361.883.4711 Fax:21 0.495.8015 Fax: 51 2.284.7764 6817 Leopard St. 10856 Vandale 7 Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 78664 www.rocktesting.com SUBSURFACE INVESTIGATION, LABORATORY TESTING PROGRAM, AND GEOTECHNICAL DATA REPORT FOR THE PROPOSED RUNWAY AND TAXIWAY PAVEMENT REHABILITATION RUNWAY 13-31, PARALLEL TAXIWAY B AND ASSOCIATED TAXIWAYS CORPUS CHRISTI INTERNATIONAL AIRPORT CORPUS CHRISTI, TEXAS RETL JOB NUMBER: G121054 PREPARED FOR: GARVER, LLC 3755 SOUTH CAPITOL OF TEXAS HIGHWAY AUSTIN, TEXAS 78704 FEBRUARY 24, 2021 PREPARED BY: ROCK ENGINEERING AND TESTING LABORATORY, INC. 6817 LEOPARD STREET CORPUS CHRISTI, TEXAS 78409 PHONE: (361) 883-4555; FAX: (361) 883-4711 TEXAS PROFESSIONAL ENGINEERING FIRM REGISTRATION NO. 2101 � �. •! . s ,►fir %.,..Dar �Darren Lantz.... P.�EOF TF.,11� f o• 94868 •'& .. •JAMES• ••P. NAL f BAUER •�% �����\\�~ ....;....12 9 201....;...'� _ �I�ENSEC:`���: 'S1ONAI.ENG'r �� .......� James P. Bauer, P.E. %I, Darren W. Lantz, P.E. Corpus Christi Branch Manager Senior Engineer t��,SD 4 Ted 6j� T o � TABLE OF CONTENTS Page INTRODUCTION..................................................................................................................... 1 Authorization ........................................................................................................................ 1 Purposeand Scope.............................................................................................................. 1 General................................................................................................................................. 1 SITEDESCRIPTION............................................................................................................... 2 FIELD EXPLORATION ........................................................................................................... 2 Scope ................................................................................................................................... 2 Drilling and Sampling Procedures ........................................................................................ 4 FieldObservations................................................................................................................ 4 LABORATORY TESTING PROGRAM................................................................................... 5 SUBSURFACE CONDITIONS................................................................................................ 5 General................................................................................................................................. 5 Existing Pavement Conditions.............................................................................................. 6 SoilConditions ..................................................................................................................... 7 GroundwaterObservations................................................................................................... 8 PAVEMENT CONSIDERATIONS ........................................................................................... 8 Potential Vertical Rise (PVR)................................................................................................ 8 Subgrade Soil and Base Material Parameters...................................................................... 9 GENERAL COMMENTS......................................................................................................... 9 APPENDIX: Site Vicinity Map Boring Location Plan Boring Logs B-1 to B-19 Key to Soil Classification and Symbols Asphalt Core Photograph Logs February 24, 2021 RUNWAY AND TAXIWAY PAVEMENT REHABILITATION Attn: Mr. Derek Mayo, P.E. Runway 13-31, Parallel Taxiway B and Associated Taxiways RETL Job Number G121054 Corpus Christi International Airport, Corpus Christi, Texas INTRODUCTION This report presents the results of a soil exploration and a laboratory testing program for the proposed Runway and Taxiway Pavement Rehabilitation project, to include Runway 13-31, Parallel Taxiway B and Associated Taxiways, located at the Corpus Christi International Airport in Corpus Christi, Texas. This study was conducted for Garver, LLC (Garver). Authorization The scope of work for this project was performed in accordance with a Rock Engineering and Testing Laboratory, Inc. (RETL) Proposal No. P111920A, Revision 2, dated December 9, 2020. Our services were approved by Garver, LLC on January 28, 2021 by provision and execution of the Agreement for Subconsultant Professional Services between RETL and Garver, for Garver Project No. 21 A06171. Purpose and Scope The purpose of this exploration was to inventory the existing pavement sections and obtain soil and groundwater data at the site to enable a pavement design for potential repair areas. The scope of the exploration and analysis included the subsurface exploration, field and laboratory testing, engineering evaluation of the subsurface soils, provision of existing pavement constituents and preparation of this report. The scope of work for this project was determined by Garver. The scope of services did not include design of, or design recommendations for, the rehabilitated pavement structures, as we understand that the pavement design will be performed by Garver. In addition, the scope of services did not include an environmental assessment. Any statements in this report, or on the boring logs, regarding odors, colors, unusual or suspicious items or conditions are strictly for the information of the client. General The exploration and analysis of the subsurface conditions reported herein are considered sufficient in detail and scope to provide existing pavement profile information, groundwater data, and empirical or correlative modulus values for the raw subgrade soils and base materials for use by the project designer. The information submitted for the proposed project is based on project details provided by Garver and the pavement and soil information obtained at the boring locations. If the designers require additional soil parameters to complete the design of the proposed repairs or rehabilitation, and this information can be obtained from the soil data and laboratory tests performed within the scope of work included in our proposal for this project, then RETL will provide the additional information requested as a supplement to this report. Page 1 of 9 February 24, 2021 RUNWAY AND TAXIWAY PAVEMENT REHABILITATION Attn: Mr. Derek Mayo, P.E. Runway 13-31, Parallel Taxiway B and Associated Taxiways RETL Job Number G121054 Corpus Christi International Airport, Corpus Christi, Texas The Geotechnical Engineer states that the findings, specifications or professional advice contained herein have been presented after being prepared in a manner consistent with that level of care and skill ordinarily exercised by reputable members of the Geotechnical Engineer's profession practicing contemporaneously under similar conditions in the locality of the project. RETL operates in general accordance with, "Standard Practice for Minimum Requirements for Agencies Engaged in the Testing and/or Inspection of Soil and Rock as Used in Engineering Design and Construction, (ASTM D3740)." No other representations are expressed or implied, and no warranty or guarantee is included or intended. This study was conducted for Garver and the design team for the specific application to the proposed Runway and Taxiway Pavement Rehabilitation project, to include Runway 13-31, Parallel Taxiway B and Associated Taxiways, located at the Corpus Christi International Airport in Corpus Christi, Texas. SITE DESCRIPTION The site of the planned Runway and Taxiway Pavement Rehabilitation project is located at the Corpus Christi International Airport in Corpus Christi, Texas. There is an existing Runway 13- 31 and Parallel Taxiway B, running in the northwest to southeast direction. The Runway 13- 31 and Taxiway B are each approximately 1.6 miles in length and consist of flexible, asphaltic concrete pavement systems. In addition, multiple smaller taxiways are also present and also consist of flexible, asphaltic concrete pavements. The runway, taxiways and the surrounding areas are relatively flat and level. At the time of our field investigation the condition of the ground surface was firm and did not pose any significant difficulties to the drill crew moving their equipment. A Site Vicinity Map is included in the Appendix of this report. FIELD EXPLORATION Scope The field exploration, to evaluate the thickness and engineering characteristics of the existing pavement materials and pavement bearing materials, included reconnaissance of the project site, performing the test boring operations and obtaining disturbed split spoon soil samples and relatively undisturbed Shelby tube samples. During the sample recovery operations, the soils encountered were classified and recorded on the boring logs in accordance with "Standard Guide for Field Logging of Subsurface Exploration of Soil and Rock, (ASTM D5434)." Nineteen borings were performed for the purpose of providing existing pavement material constituents and pavement subgrade information for the proposed project. The table below provides the boring identification, boring depth and GPS coordinates. Page 2 of 9 February 24, 2021 RUNWAY AND TAXIWAY PAVEMENT REHABILITATION Attn: Mr. Derek Mayo, P.E. Runway 13-31, Parallel Taxiway B and Associated Taxiways RETL Job Number G121054 Corpus Christi International Airport, Corpus Christi, Texas Summary of Boring Information Boring Identification Boring Depth (ft) GPS Coordinates B-1 6 N 27.764990 W 97.498630 B-2 5 N 27.76516' W 97.50030' B-3 5 N 27.76657' W 97.49936° B-4 15 N 27.76731° W 97.49850' B-5 5.5 N 27.766570 W 97.500690 B-6 6 N 27.76854' W 97.50283° B-7 15 N 27.77149' W 97.50046' B-8 6 N 27.77249' W 97.50481° B-9 15 N 27.76985' W 97.50550' B-10 6 N 27.77273' W 97.50731° B-11 5 N 27.77442' W 97.50656° B-12 15 N 27.77472' W 97.50830' B-13 15 N 27.77693' W 97.50809' B-14 6 N 27.77764' W 97.51417° B-15 6 N 27.77731 0 W 97.512390 B-16 5 N 27.77809' W 97.51052° B-17 5 N 27.77879' W 97.50830' B-18 6 N 27.779560 W 97.513040 B-19 6 N 27.77942' W 97.51482' Garver determined the number, locations and minimum depths of the borings. RETL performed the drilling operations. The GPS coordinates were obtained at the boring locations using a Garmin GPS model eTrex and are provided in this report and on the boring logs. Upon completion of the drilling operations and obtaining the groundwater observations, the borings were backfilled with bentonite and the surface was restored using concrete. A Boring Location Plan is provided in the Appendix of this report. Page 3 of 9 February 24, 2021 RUNWAY AND TAXIWAY PAVEMENT REHABILITATION Attn: Mr. Derek Mayo, P.E. Runway 13-31, Parallel Taxiway B and Associated Taxiways RETL Job Number G121054 Corpus Christi International Airport, Corpus Christi, Texas The borings performed for this project were used to determine the pavement material types and thicknesses, as well as the classification and strengths of the subgrade soils. The information provided on the boring logs include boring location, boring depth, pavement materials, soil classification, soil strengths, and laboratory test results. The boring logs are included in the Appendix. Drilling and Sampling Procedures A diamond tipped core barrel was utilized to penetrate and obtain samples of the pavement constituents to a depth where natural in-situ soils were encountered. The test borings were performed using a drilling rig equipped with a rotary head turning solid stem augers to advance the boreholes. Disturbed soil samples were obtained employing split-barrel sampling procedures in general accordance with the procedures for, "Penetration Test and Split-Barrel Sampling of Soils, (ASTM D1586)." Relatively undisturbed soil samples were obtained using thin-wall tube sampling procedures in general accordance with, "Thin Walled Tube Sampling of Soils, (ASTM D1587)." The samples obtained by this procedure were extruded by a hydraulic ram in the field. The samples were visually classified, placed in plastic bags, marked according to boring number, depth and any other pertinent field data, stored in special containers and delivered to the laboratory for testing. Field Observations Penetration Tests — During the sampling procedures, standard penetration tests (SPT) were performed to obtain the standard penetration value of the subgrade soil at selected intervals. The standard penetration value (N) is defined as the number of blows of a 140-pound hammer, falling 30 inches, required to advance the split-barrel sampler 1 foot into the soil. The sampler is lowered to the bottom of the previously cleaned drill hole and advanced by blows from the hammer. The number of blows is recorded for each of three successive 6-inch penetrations. The "N" value is obtained by adding the second and third 6-inch increment number of blows. An automatic hammer was utilized when performing SPT. An automatic hammer is usually taken as having an efficiency of one. The results of standard penetration tests indicate the relative density of cohesionless soils and comparative consistency of cohesive soils, thereby providing a basis for estimating the relative strength and compressibility of the soil profile components. Water Level Observations — Water level observations were obtained during the test boring operations. Water level observations are noted on the boring logs provided in the Appendix. In relatively pervious soils, such as sandy soils, the indicated depths are usually reliable groundwater levels. In relatively impervious soils, such as clay soils, a suitable estimate of the groundwater depth may not be possible, even after several days of observation. Seasonal variations, temperature, land-use, proximity to large water bodies and recent rainfall conditions may influence the depth to the groundwater. The amount of water an open borehole largely depends on the permeability of the soils encountered at the boring locations. Page 4 of 9 February 24, 2021 RUNWAY AND TAXIWAY PAVEMENT REHABILITATION Attn: Mr. Derek Mayo, P.E. Runway 13-31, Parallel Taxiway B and Associated Taxiways RETL Job Number G121054 Corpus Christi International Airport, Corpus Christi, Texas Ground Surface Elevations — The ground surface elevations at the boring locations were not provided, therefore, depths referred to in this report are from the ground surface at the boring locations during the time of our field investigation. LABORATORY TESTING PROGRAM In addition to the field investigation, a laboratory testing program was conducted to determine additional pertinent engineering characteristics of the subsurface materials. The laboratory testing program included supplementary visual classification (ASTM D2487) and water content tests (ASTM D2216) on the samples. In addition, selected samples were subjected to Atterberg limits tests (ASTM D4318) and percent material finer than the#200 sieve tests (ASTM D1140). The estimated soil shear strengths of cohesive soil samples were obtained using a hand penetrometer. The laboratory testing program was conducted in general accordance with applicable ASTM Specifications. The results of these tests are to be found on the accompanying boring logs provided in the Appendix. SUBSURFACE CONDITIONS General The types of pavement bearing materials encountered in the test borings have been visually classified and are described in detail on the boring logs. The results of the standard penetration tests, hand penetrometer values, water level observations and laboratory tests are presented on the boring logs. Representative samples of the soils were placed in polyethylene bags and are now stored in the laboratory for further analysis, if desired. Unless notified to the contrary, the samples will be disposed of three months after issuance of this report. The stratification of the soil, as shown on the boring logs, represents the soil conditions at the actual boring locations. Variations may occur between or beyond the boring locations. Lines of demarcation represent the approximate boundary between different soil types, but the transition may be gradual, or not clearly defined. It should be noted that, whereas the test borings were drilled and sampled by experienced drillers, it is sometimes difficult to record changes in stratification within narrow limits. In the absence of foreign substances, it is also difficult to distinguish between discolored soils and clean soil fill. Page 5 of 9 February 24, 2021 RUNWAY AND TAXIWAY PAVEMENT REHABILITATION Attn: Mr. Derek Mayo, P.E. Runway 13-31, Parallel Taxiway B and Associated Taxiways RETL Job Number G121054 Corpus Christi International Airport, Corpus Christi, Texas Existing Pavement Conditions The description and thicknesses of the existing pavement constituents encountered at the boring locations are provided in the table below. Some of the locations contained multiple base materials, subbase materials and/or fill materials between the asphalt and the treated or untreated clay subgrade soils. For the purposes of this report, these materials are all expressed as base materials. Photographic documentation of the asphalt pavement cores is presented in the Appendix of this report. Existing Pavement Constituents HMAC Base Material Base Material Properties Boring Approximate Approximate Number Thickness Thickness Material Type ILL PI -#200 +#4 Inches Inches B-1 12.25 23.5 Silty Sand with Gravel 11 1 27 32 9.5 Silty Sand with Gravel --- --- 22 37 B-2 9.5 23 Silty Clayey Sand with Gravel 21 6 16 41 12 Poorly Graded Sand with Silt --- --- 7 --- 21.5 Poorly Graded Gravel with Silt --- --- 7 69 and Sand B-3 6.25 14 Poorly Graded Sand with Clay 30 11 24 36 and Gravel 6 Poorly Graded Sand with Silt --- --- 8 --- B-4 16 10 Clayey Sand with Gravel 27 16 23 19 22 Poorly Graded Sand with Clay 21 9 11 --- 13.5 Silty Clayey Sand 20 6 24 13 B-5 14.25 8 Poorly Graded Sand with Silt NP NP 8 --- B-6 12 24 Clayey Sand with Gravel 21 10 37 17 B-7 18 6 Clayey Sand 40 15 32 5 B-8 12.25 17.75 Silty Gravel with Sand 12 2 25 39 12 Silty Sand --- --- 30 8 B-9 17.75 18 Poorly Graded Sand with Silt NP NP 8 --- B-10 12.5 23.5 Silty Sand with Gravel 11 2 27 31 B-11 12.5 16.25 Silty Sand with Gravel 11 1 28 30 B-12 14.75 15 Clayey Sand with Gravel 27 15 18 32 18 Poorly Graded Sand with Silt NP NP 9 --- B-13 16.75 4.25 Silty Sand with Gravel NP NP 27 16 B-14 12.5 23.5 Silty Sand with Gravel 12 2 32 26 B-15 12.25 23.5 Silty Sand with Gravel 10 NP 23 34 Page 6 of 9 February 24, 2021 RUNWAY AND TAXIWAY PAVEMENT REHABILITATION Attn: Mr. Derek Mayo, P.E. Runway 13-31, Parallel Taxiway B and Associated Taxiways RETL Job Number G121054 Corpus Christi International Airport, Corpus Christi, Texas Existing Pavement Constituents (Continued) HMAC Base Material Base Material Properties Boring Approximate Approximate Number Thickness Thickness Material Type LL PI -#200 +#4 (Inches) (Inches) 14.5 Silty Sand NP NP 29 14 B-16 9 12 Poorly Graded Sand with Silt NP NP 10 --- 11 Silty Sand with Gravel 17 2 17 22 B-17 7 20 Poorly Graded Sand with Silt NP NP 12 --- B-18 13 17 Silty Sand with Gravel 11 3 22 35 B-19 12.75 23 Silty Sand with Gravel 12 1 34 28 Where: LL = Liquid limit(%) PI = Plasticity index 4200 = Material passing #200 sieve, % +#4 = Material retained on#4 sieve, % Soil Conditions The subgrade soils immediately below the existing pavement base materials, as presented above, were tested using a phenolphthalein solution. Phenolphthalein is a chemical compound that can be used as an indicator of the presence of lime, as it turns colorless in acidic solutions and pink in basic solutions. Based upon the phenolphthalein testing on the clayey subgrade at each boring location, it appears that lime is present in the subgrade soils as indicated in the following table. Pavement Subgrade Phenolphthalein Test Results Boring Identification Reactive to Phenolphthalein B-1, B-6 through B-8, B-10, B-11, B-13 through B-15, B-18 and B-19 Yes B-2 through B-5, B-9, B-12, B-16 and B-17 No The generalized soil conditions encountered beneath the existing pavement constituents and, stabilized subgrade where present, at the project site have been summarized and soil properties including soil classification, undrained shear strength, angle of internal friction and effective unit weight are provided in the following table. Page 7 of 9 February 24, 2021 RUNWAY AND TAXIWAY PAVEMENT REHABILITATION Attn: Mr. Derek Mayo, P.E. Runway 13-31, Parallel Taxiway B and Associated Taxiways RETL Job Number G121054 Corpus Christi International Airport, Corpus Christi, Texas Soil Profile Table D Description ILL PI C ye 4200 N P PC- 6 Fat CLAY 62 - 78 38- 53 1,000 0 115 76- 88 7- 19 2.0 -4.0 6- 11 Fat CLAY 61 - 66 36-42 1,500 0 120 89- 93 --- 2.0 -3.0 11 - 15 Fat and Lean CLAY 39 - 53 23- 33 1,500 0 120 85- 97 --- 1.0 -3.5 Where: D = Depth, feet PC = Thickness of Pavement Constituents LL = Liquid limit(%) PI = Plasticity index C = Soil Cohesion, psf(undrained) � =Angle of Internal Friction, deg. (undrained) ye = Effective soil unit weight, pcf 4200 = Material passing #200 sieve, % N= Standard penetration test, blows per foot P = Hand penetrometer value range, tsf Exceptions to the above average and generalized soil conditions do exist. Most notable is the presence of a clayey sand subgrade at Boring B-1. Detailed descriptions of the soils encountered at the boring locations are provided on the boring logs included in the Appendix. Groundwater Observations Groundwater was encountered in Boring B-13 at a depth of approximately 13 feet during the drilling operations and was measured within the open borehole at a depth of approximately 13.5 feet upon completion of drilling. Groundwater was not encountered in any of the remaining soil borings or observed within the open boreholes upon completion of drilling. It should be noted that the water level in open boreholes may require several hours to several days to stabilize depending on the permeability of the soils and that groundwater levels at this site may be subject to seasonal conditions, recent rainfall, drought or temperature effects. PAVEMENT CONSIDERATIONS Potential Vertical Rise (PVR) The laboratory test results indicate that the subsoils in the active zone at this site are high to very high in plasticity. The calculated total potential vertical rise (PVR) at this site, considering undeveloped land or unpaved areas, is estimated to be approximately 4 to 41/4 inches. In consideration of the existing pavement structures, the PVR in the pavement areas is estimated to be approximately 2'/2 to 2% inches. These PVR values represent the vertical rise that can be experienced by dry subsoils if they are subjected to conditions that allow them to become saturated, such as poor drainage. The actual movement of the subsoils is dependent upon their change in moisture content. The PVR was calculated using the Texas Department of Transportation Method TEX-124E and took into account the depth of the active zone, estimated to extend to a depth of approximately 15 feet at this site, and the Atterberg limits test results of the soils encountered within the active zone. Page 8 of 9 February 24, 2021 RUNWAY AND TAXIWAY PAVEMENT REHABILITATION Attn: Mr. Derek Mayo, P.E. Runway 13-31, Parallel Taxiway B and Associated Taxiways RETL Job Number G121054 Corpus Christi International Airport, Corpus Christi, Texas Reduction of PVR is typically not performed beneath pavements servicing typical automobile and service vehicle types of traffic and therefore specific PVR reduction recommendations are not provided in this report. However, if PVR reduction is required in the design or desired by the pavement designers, RETL should be contacted for specific PVR reduction recommendations. Subgrade Soil and Base Material Parameters The California Bearing Ratio (CBR) is a penetration test that is commonly used in pavement design and represents a ratio to that of crushed stone. Specific field or laboratory CBR testing has not been performed for this analysis. Based upon local experience and correlative data, the estimated CBR value for the natural fat clay subgrade soils encountered with the upper 5 to 10 feet at this site is 2. The Resilient Modulus (Mr), a measure of material stiffness, is often used in pavement response computation models to characterize unbound pavement materials and is common in mechanistic-empirical pavement design methods. It is defined as a ratio of applied axle deviator stress and recoverable axial strain. Specific laboratory testing has not been performed for this analysis. Based on our experience and correlative data and considering the variability in the existing base material types and thicknesses identified at the boring locations, the estimated Mr value for the governing existing base material is 10,000 psi. GENERAL COMMENTS If significant changes are made in the character or location of the proposed project, a consultation should be arranged to review any changes with respect to the prevailing soil conditions. At that time, it may be necessary to submit supplementary recommendations. It is recommended that the services of RETL be engaged to test and evaluate the soils in the pavement excavations prior to placing pavement constituents in order to verify that the existing pavement materials and bearing soils are consistent with those encountered in the borings. RETL cannot accept any responsibility for any conditions that deviate from those described in this report, nor for the performance of the rehabilitated pavements if not engaged to also provide construction observation and testing for this project. If it is required for RETL to accept any liability, then RETL must agree with the plans and perform such observation during construction as we recommend. All sheeting, shoring and bracing of trenches, pits and excavations should be made the responsibility of the contractor and should comply with all current and applicable local, state and federal safety codes, regulations and practices, including the Occupational Safety and Health Administration. Page 9 of 9 APPENDIX 0�P`�G rFS �G�� T/� • GEOTECHNICAL ENGINEERING • CONSTRUCTION MATERIALS ENGINEERING&TESTING '9q�. °Qe° • SOILS •ASPHALT•CONCRETE o'4Y W,a SITE VICINITY MAP Al x i h ,aIr • • '4 a U 8� February 24, 2021 RUNWAY AND TAXIWAY PAVEMENT REHABILITATION Attn: Mr. Derek Mayo, P.E. Runway 13-31, Parallel Taxiway B and Associated Taxiways RETL Job Number: G121054 Corpus Christi International Airport, Corpus Christi, Texas ROCK ENGINEERING & TESTING LABORATORY, INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office: 512.284.8022 Fax:361.883.471 l Fax:210.495.8015 Fax:51 2.284.7764 6817 Leopard St. 10856 Vandale 7 Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 78664 www.rocktesting.com 0�P`�G rFS �G�� T/� • GEOTECHNICAL ENGINEERING • CONSTRUCTION MATERIALS ENGINEERING&TESTING '9q�. °Qe° • SOILS •ASPHALT•CONCRETE o'4Y W,a BORING LOCATION PLAN AL IL 0-4 T a 1 1 r� 7O February 24, 2021 RUNWAY AND TAXIWAY PAVEMENT REHABILITATION Attn: Mr. Derek Mayo, P.E. Runway 13-31, Parallel Taxiway B and Associated Taxiways RETL Job Number: G121054 Corpus Christi International Airport, Corpus Christi, Texas ROCK ENGINEERING & TESTING LABORATORY, INC. Corpus Christi San Antonio Round Rock Office:361.883.4555 Office:210.495.8000 Office: 512.284.8022 Fax:361.883.471 l Fax:210.495.8015 Fax:51 2.284.7764 6817 Leopard St. 10856 Vandale 7 Roundville Ln. Corpus Christi,TX 78409 San Antonio,TX 78216 Round Rock,TX 78664 www.rocktesting.com LOG OF BORING B-1 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </0 I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/26/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z W FF z in J H LL O �_ J H } LL � p m> zo Lu � � co U) O } -j � � z cnnZ > o ° ° ¢ ¢ ZU za W z SURFACE ELEVATION: N/A O Z o ai z a c7 0 LL PL PI '0 OR ° ; DESCRIPTION OF STRATUM ASPHALT, approximately 12.25 inches 1 SILTY SAND WITH GRAVEL, light tan, approximately 23.5 2 4 11 10 1 27 inches. (SM) (32%gravel sized particles) 3 ss STABILIZED FAT CLAY, dark brown, moist, stiff. s-1 N=10 38 (reactive to phenolphthalein) 4 ----- ---- ---- -- -- -- ----------------------------- 5 ss CLAYEY SAND, brown, moist,stiff. SC S 2 N=9 14 27 15 12 31 ( ) 6 Boring was terminated at a depth of 6 feet. 7 8 9 10 11 12 13 N N 14 J W Y 0 15 d c� a N O N Z o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE N°27.76499 W°97.49863 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-2 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </0 I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/26/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z W F z in J H~ O �_ J H } LL � p m> zo Lu � � co U) O } -j � � z cnnZ > o ° ° ¢ ¢ ZU za W z SURFACE ELEVATION: N/A O Z o ai z a c7 0 LL PL PI '0 OR ° ; DESCRIPTION OF STRATUM ASPHALT, approximately 9.5 inches 1 8 22 SILTY SAND WITH GRAVEL, brown,approximately 9.5 inches ( gravel sized particles) 2 ss 37%SILTY CLAYEY SAND WITH GRAVEL, brown, medium. S-1 N=12 14 21 15 6 16 (SC-SM) 3 (41%gravel sized particles) ————— ———— ———— -- -- -- ------------------------------ 4 SS POORLY GRADED SAND WITH SILT, brown, moist, loose. S-2 N=9 9 7 31 62 24 38 76 FAT CLAY WITH SAND, dark brown, moist, stiff. (CH) 5 Boring was terminated at a depth of 5 feet. 6 7 8 9 10 11 12 13 N N 14 J W Y 0 15 d c� a N O N Z o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE No 27.76516 W°97.50030 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-3 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </O I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/25/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z W F z in J H~ O �_ J H } LL � p O _ LL ri W O U U U F N m> zLu � � � W O } � z�cnnZ > Z¢ ¢ U 0 0 za W z SURFACE ELEVATION: N/A O Z o ai z a c7 0 LL PL PI o OR ° ; DESCRIPTION OF STRATUM ASPHALT, approximately 6.25 inches 1 12 7 POORLY GRADED GRAVEL WITH SILT AND SAND, brown, approximately 21.5 inches (69%gravel sized particles) o 2 SS POORLY GRADED SAND WITH CLAY AND GRAVEL, light 3 S-1 N=16 15 30 19 11 24 brown, medium. (SP-SC) (36%gravel sized particles) 14 8 POORLY GRADED SAND WITH SILT, brown, moist, medium. 644- 4 rZA S-2 N=13 34 62 21 41 85 FAT CLAY, dark brown, moist, stiff. (CH) 5 Boring was terminated at a depth of 5 feet. N th N N W WI U O d C� v 0 N o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE No 27.76657 W°97.49936 Tv-TORVANE SHEAR STRENGTH TEST o LOG OF BORING B-4 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </0 I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/25/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z w FF z g in J H pO LL � O tLLL o � zLu LL� � � co U) O } -j � � z cnnz > o ° ° QQ ZU za w z N SURFACE ELEVATION: N/A O Z oCnaa o ° °i LL L PI ; t 2 DESCRIPTION OF STRATUM ASPHALT, approximately 16 inches F2 - 8 27 11 16 23 CLAYEY SAND WITH GRAVEL, brown, approximately 10 inches. (SC) ss (19%gravel sized particles) S-1 N=22 11 21 12 9 11 brown, moist, 3 medium. (SP-SC) 4 SS 88 FAT CLAY, dark brown, moist, stiff. S-2 N=11 34 5 6 SH 7 S-3 P=2.5 35 64 24 40 Same as above. 8 9 SH Same as above. S-4 P=3.0 32 90 10 11 sH 12 S-5 P=2.5 26 97 FAT CLAY, brown, moist,stiff. M 13 N N q 14 SH W S 6 P=2.5 23 Same as above. Y, 15 Boring was terminated at a depth of 15 feet. c� a N O N z o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE No 27.76731 W°97.49850 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-5 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </O I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/26/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z W F z g in J H~ pO LL � O r W O F zLu LL� � � co U) O } -j � � z cnnz > o ° ° ¢ ¢ ZU za W z N SURFACE ELEVATION: N/A O Z o ai z a c7 0 LL PL PI o OR ° ; DESCRIPTION OF STRATUM ASPHALT, approximately 14.25 inches 1 SILTY CLAYEY SAND, brown, approximately 13.5 inches. 9 20 14 6 24 (SC-SM) 2 (13%gravel sized particles) 10 NP NP NP 8 POORLY GRADED SAND WITH SILT, brown, moist, medium. 3 SS ----- ---- ---- -- -- (SP-SM) S-1 4 SS N=8 37 FAT CLAY, dark brown, moist, stiff. 5 S-2 Boring was terminated at a depth of 5.5 feet. N th N N W WI U O d C� v 0 N o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE No 27.76657 W°97.50069 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-6 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </0 I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/26/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z W F z in J H~ O �_ J H } LL � p m> zo Lu � � co U) O } -j � � z cnnZ > o ° ° ¢ ¢ ZU za W z SURFACE ELEVATION: N/A O Z o ai z a c7 0 LL PL PI '0 OR ° ; DESCRIPTION OF STRATUM ASPHALT, approximately 12 inches 1 CLAYEY SAND WITH GRAVEL, light tan,approximately 24 2 4 21 11 10 37 inches. (SC) (17%gravel sized particles) 3 ss STABILIZED FAT CLAY, dark brown, moist, hard. s-1 N=46 48 67 67 NP (reactive to phenolphthalein) 4 ----- ---- ---- -- -- -- 5 sS S-2 N=7 27 69 24 45 FAT CLAY,with calcareous, brown, moist,firm. 6 Boring was terminated at a depth of 6 feet. 7 8 9 10 11 12 13 N N 14 J W Y 0 15 d c� a N O N Z o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE No 27.76854 w°97.50283 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-7 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </0 I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/26/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z w FF z g in J H pO LL � O tLLL o � zLu LL� � � co U) O } -j � � z cnnz > o ° ° QQ ZU za w z N SURFACE ELEVATION: N/A O Z o ai z a c7 LL PL PI o OR ° ; DESCRIPTION OF STRATUM ASPHALT, approximately 18 inches 1 24 40 25 15 32 CLAYEY SAND, dark gray, approximately 6 inches. (SC) 2 (50/.gravel sized particles)(reactive to phenolphthalein) ss STABILIZED FAT CLAY,dark brown, stiff. 3_1 1a=1'r-- 31--- ---- -- -- -- (reactive to phenolphthalein) ' 4 SS S-2 N=11 31 66 26 40 86 FAT CLAY, dark brown, moist, stiff. (CH) 5 6 SH 7 S-3 P=2.0 33 Same as above. 8 9 SH Same as above, brown. CH S-4 P=2.0 32 66 24 42 93 ( ) 10 11 SH P=1.5 28 FAT CLAY, brown, moist,stiff. 12 S-5 M 13 N N 14 SH W s-s P=3.5 26 Same as above,very stiff. YI 15 Boring was terminated at a depth of 15 feet. c� a N O N z o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE No 27.77149 w°97.50046 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-8 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </O I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/25/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z W FF z in J H LL O �_ J H } LL � p m> zo Lu � � co U) O } -j � � z cnnZ > Z o ° ° ¢ ¢ U za W z SURFACE ELEVATION: N/A O Z o ai z a c7 0 LL PL PI o OR ° ; DESCRIPTION OF STRATUM ASPHALT, approximately 12.25 inches 1 SILTY GRAVEL WITH SAND, light tan, approximately 17.75 2 4 12 10 2 25 inches. (GM) (39%gravel sized particles) 3 45 STABILIZED FAT CLAY, dark brown, moist,very stiff. ss ____ (reactive to phenolphthalein) 1aE-- ---- -- -- -- ----------------------------- S-1 FAT CLAY, dark brown, moist,very stiff. 4 5 ss Same as above, stiff. CH S-2 N=9 29 70 23 47 78 ( ) 6 Boring was terminated at a depth of 6 feet. N th N N W WI U O d C� v 0 N o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE No 27.77249 w°97.50481 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-9 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </0 I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/26/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z w F z in J H~ O �_ J H } LL � p m> zo Lu � � co U) O } -j � � Z cnnZ > o ° ° QQ ZU za w z SURFACE ELEVATION: N/A O Z o ai z a c7 LL PL PI o OR ° ; DESCRIPTION OF STRATUM ASPHALT, approximately 17.75 inches 1 6 30 SILTY SAND, brown,approximately 12 inches ° 2 (8%gravel sized particles) 0 3 SS POORLY GRADED SAND WITH SILT, brown, moist, medium. S-1 N=21 8 NP NP NP 8 (SP-SM) 4 ss N=10 31 FAT CLAY, dark brown, moist, stiff. 5 S-2 6 SH 7 S-3 P=2.0 33 61 25 36 92 Same as above. (CH) 8 9 SH S-4 P=2.5 31 Same as above. 10 11 SH P=3.0 24 53 20 33 FAT CLAY, light brown, moist, stiff. (CH) 12 S-5 M 13 N N q 14 SH W S 6 P=2.5 22 Same as above. Y 15 Boring was terminated at a depth of 15 feet. c� a N O N Z o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE N°27.76985 w°97.50550 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-10 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </0 I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/26/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z W F z in J H~ O �_ J H } LL � p m> zo Lu � � co U) O } -j � � z cnnZ > o ° ° ¢ ¢ ZU za W z SURFACE ELEVATION: N/A O Z o ai z a c7 LL PL PI o OR ° ; DESCRIPTION OF STRATUM ASPHALT, approximately 12.5 inches 1 4 11 9 2 27 SILTY SAND WITH GRAVEL, light tan, approximately 23.5 2 inches. (SM) (31%gravel sized particles) 3 ss N=13 41 68 63 5 STABILIZED FAT CLAY, dark brown, moist, stiff. 4 S-1 ———— ———— —— —— —— (reactive to phenolphthalein) 5 sS S-2 N=11 33 72 27 45 FAT CLAY,with calcareous, brown, moist, stiff. 6 Boring was terminated at a depth of 6 feet. 7 8 9 10 11 12 13 N N 14 J W Y 0 15 d c� a N O N Z o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE No 27.77273 w°97.50731 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-11 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </O I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/25/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z W F z g in J H~m> o a U U O pO LL � O r W O F zLu LL� � � co U) O } -j � � z cnnz > o ° ° ¢ ¢ ZU za W z NZ SURFACE ELEVATION: N/A oCnaa o ° °i LL L PI ; t 2 DESCRIPTION OF STRATUM ASPHALT, approximately 12.5 inches 1 SILTY SAND WITH GRAVEL, light tan, approximately 16.25 inches. (SM) 2 4 11 10 1 28 (30%gravel sized particles) 3 s N=29 31 STABILIZED FAT CLAY,dark gray, moist, very stiff. (reactive to phenolphthalein) ----- ---- ---- -- -- — ----------------------------- 4 SS FAT CLAY, dark brown, moist,very stiff. S-2 N=19 34 72 25 47 rY 5 Boring was terminated at a depth of 5 feet. N th N N W WI U O d C� v 0 N z o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE N°27.77442 w°97.50656 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-12 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </0 I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/26/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z w FF z in J H LL O �_ J H } LL � p m> zo Lu � � co U) O } -j � � Z cnnZ > o ° ° QQ ZU za w z SURFACE ELEVATION: N/A O Z oCnaa o ° °i LL L PI ; t 2 DESCRIPTION OF STRATUM ASPHALT, approximately 14.75 inches 1 CLAYEY SAND WITH GRAVEL, brown, approximately 15 6 27 12 15 18 inches. (SC) 2 (32%gravel sized particles) 3 ss POORLY GRADED SAND WITH SILT, brown, moist, medium. S-1 N=21 9 NP NP NP 9 (SP-SM) 4 ss 5 S-2 N=10 31 FAT CLAY, dark brown, moist, stiff. 6 SH 7 S-3 P=2.0 34 62 25 37 89 Same as above. (CH) 8 9 SH S-4 P=2.5 34 Same as above, brown. 10 11 ————— ———— ———— -- SH P=2.0 22 39 16 23 LEAN CLAY, brown, moist,stiff. 12 S-5 Q 13 N N 14 SH W S 6 P=1.5 22 Same as above. Y 15 Boring was terminated at a depth of 15 feet. c� a N O N Z o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE N°27.77472 w°97.50830 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-13 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </0 I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/26/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: w LU p w Groundwater(GW)was encountered at a depth of 13 feet during drilling. w - ? Fn GW at 13.5 feet upon completion. z F g J H IL O �_ J H } � � p O _ LLtLLLo � 0 0 t= _ N � v✓ z Lu � a� U) � z w �j n n Z > > Q Q w p Z Z o a °o o° U a a z a w z SURFACE ELEVATION: N/A O Z o ai z a C1 LL PL PI '0 OR ° ; DESCRIPTION OF STRATUM ASPHALT, approximately 16.75 inches 1 SILTY SAND WITH GRAVEL, approximately 4.25 inches. 2 (SM)(16%gravel sized particles) ss STABILIZED FAT CLAY,dark brown, moist, stiff. 3 s-1 N=9 32 NP NP NP (reactive to phenolphthalein) 4 SH S-2 P=4.0 29 FAT CLAY, dark brown, moist,very stiff. 5 6 SH 7 S-3 P=2.5 34 66 26 40 93 Same as above, stiff. (CH) 8 9 SH S-4 P=2.5 31 Same as above, brown. 10 11 ————— ———— ———— -- SH 12 S-5 P=3.0 30 40 16 24 85 LEAN CLAY, brown, moist,stiff. (CL) 13 N N 14 SH W S 6 P=1.0 22 Same as above,firm. Y 15 Boring was terminated at a depth of 15 feet. c� a N O N z o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE No 27.77693 W°97.50809 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-14 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </0 I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/26/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z W FF z in J H LL O �_ J H } LL � p m> zo Lu � � co U) O O } -j � � z cnnZ > o ° ° ¢ ¢ ZU za W z Z SURFACE ELEVATION: N/A oCnaa o ° °i LL L PI ; t 2 DESCRIPTION OF STRATUM ASPHALT, approximately 12.5 inches 1 SILTY SAND WITH GRAVEL, light tan, approximately 23.5 2 3 12 10 2 32 inches. (SM) (26%gravel sized particles) 3 43 STABILIZED FAT CLAY, dark brown, moist, hard. ss ____ ____ __ __ __ (reactive to phenolphthalein) 4 5 ss FAT CLAY, dark gray, moist, stiff. S-2 N=11 26 78 25 53 9 Y� 6 Boring was terminated at a depth of 6 feet. 7 8 9 10 11 12 13 N N 14 J W Y 0 15 d c� a N O N Z o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE No 27.77764 W°97.51417 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-15 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </0 I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/26/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z W F z in J H~ O �_ J H } LL � p m> zo Lu � � co U) O } -j � � z cnnZ > o ° ° ¢ ¢ ZU za W z SURFACE ELEVATION: N/A O Z o ai z a c7 0 LL PL PI '0 OR ° ; DESCRIPTION OF STRATUM ASPHALT, approximately 12.25 inches 1 2 4 10 10 NP 23 SILTY SAND WITH GRAVEL, light tan, approximately 23.5 inches. (SM) (34%gravel sized particles) 3 STABILIZED FAT CLAY,dark brown, moist, stiff. ss 32_ 49 40__9 __ __ __ (reactive to phenolphthalein) 4 S_1 14=1'r-- — -- — — 5 SH FAT CLAY, dark brown, moist, stiff. S-2 P=2.0 35 6 Boring was terminated at a depth of 6 feet. 7 8 9 10 11 12 13 N N 14 J W Y 0 15 d c� a N O N Z o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE No 27.77731 W°97.51239 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-16 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </0 I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/26/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z W F z g in J H~ pO LL � O tLW° � zLu �� � � co U) O } -j � � z cnnz > o ° ° ¢ ¢ ZU za W z N SURFACE ELEVATION: N/A O Z o ai z a c7 0 LL PL PI '0 OR ° ; DESCRIPTION OF STRATUM ASPHALT, approximately 9 inches 1 SILTY SAND, brown,approximately 14.5 inches. (SM) 2 9 NP NP NP 29 (14%gravel sized particles) ss POORLY GRADED SAND WITH SILT, brown, moist, medium. 3 S-1 N=21 11 NP NP NP 10 (SP-SM)— ----- ---- ---- -- -- -- ------------------------- 4 ss S-2 N=11 36 68 29 39 88 FAT CLAY, dark brown, moist, stiff. (CH) 5 Boring was terminated at a depth of 5 feet. 6 7 8 9 10 11 12 13 N N 14 J W Y 0 15 d c� a N O N z o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE No 27.77809 w°97.51052 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-17 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </O I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/25/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z W F z in J H~ O �_ J H } LL � p O _ LL ri W O U U U F N m> zLu � � � W O } � z�cnnZ > Z¢ ¢ U 0 0 za W z SURFACE ELEVATION: N/A O Z o ai z a c7 0 LL PL PI o OR ° ; DESCRIPTION OF STRATUM ASPHALT, approximately 7 inches SILTY SAND WITH GRAVEL, approximately 11 inches. (SM) 1 7 17 15 2 17 (22%gravel sized particles) 2 ss N=23 9 NP NP NP 12 POORLY GRADED SAND WITH SILT, brown, moist, medium. S-1 (SP-SM) 3 4 - FAT CLAY, dark brown, moist, stiff. S-2 N=11 35 5 Boring was terminated at a depth of 5 feet. N th N N W WI U O d C� v 0 N Z o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE N°z777s7sw°97.50830 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-18 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </O I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/25/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z W F z g in J H~ O �_ J H } LL � p m � � co U U) O O > z Lu ��a� U) � z W } -j �cncnz > > ¢ ¢ W o Z U z o o °o o°° U a a z a W z SURFACE ELEVATION: N/A } O Z o ai z a c7 0 LL PL PI o OR ° ; DESCRIPTION OF STRATUM ASPHALT, approximately 13 inches 1 SILTY SAND WITH GRAVEL, light tan, approximately 17 2 3 11 8 3 22 inches. (SM) (35%gravel sized particles) 3 STABILIZED FAT CLAY, dark brown, moist,very stiff. SS N=21 33 60 50 10 (reactive to phenolphthalein) S-1 ————— ———— ———— -- -- -- —————————————————————————————— 4 5 SS FAT CLAY, darkgray, moist, stiff. S-2 N=8 34 78 29 49 6 Boring was terminated at a depth of 6 feet. N th N N W WI U O d C� v 0 N o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE N°27.77956 w°97.51304 o Tv-TORVANE SHEAR STRENGTH TEST J LOG OF BORING B-19 SHEET 1 of 1 G CLIENT: Garver, LLC Rock Engineering&Testing Lab. Inc PROJECT: CCIA Runway and Taxiway Rehabilitation ti 6817 Leopard Street Corpus Christi,Texas 78409 LOCATION: Corpus Christi, Texas </0 I �P•O Telephone: 361-883-4555 NUMBER: G121054 9yT0 9r G°tee° Fax: 361-883-4711 DATES DRILLED: 1/26/2021 FIELD DATA LABORATORY DATA DRILLING METHOD(S): ATTERBERG Solid Stem Auger LIMITS x w GROUNDWATER INFORMATION: LU w p w Dry and Open upon completion of drilling. � t- z W F z in J H~ O �_ J H } LL � p m> zo Lu � � co U) O } -j � � z cnnZ > Z o ° ° ¢ ¢ U za W z SURFACE ELEVATION: N/A O Z o ai z a c7 0 LL PL PI '0 OR ° ; DESCRIPTION OF STRATUM ASPHALT, approximately 12.75 inches 1 SILTY SAND WITH GRAVEL, light tan, approximately 23 4 12 11 1 34 inches. (SM) 2 (28%gravel sized particles) 3 SS STABILIZED FAT CLAY, dark brown, moist, stiff. 4 S_1 N=11 28 (reactive to phenolphthalein) ————— ———— ———— -- -- -- —————————————————————————————— 5 SS S-2 N=9 25 75 24 51 FAT CLAY, dark brown, moist, stiff. 6 Boring was terminated at a depth of 6 feet. 7 8 9 10 11 12 13 N N 14 J W Y 0 15 d c� a N O N Z o N - STANDARD PENETRATION TEST RESISTANCE REMARKS: mi Qc- STATIC CONE PENETROMETER TEST INDEX Drilling operations were performed by RETL at GPS Coordinates o P - POCKET PENETROMETER RESISTANCE N°27 77942 w°97.51482 o Tv-TORVANE SHEAR STRENGTH TEST J Rock Engineering&Testing Laboratory 6817 Leopard Street Corpus Christi,TX 78409-1703 c Engineering&Testing Telephone: 361-883-4555 <,0 94r°9r P�o Laboratory, Inc. Fax: 361-883-4711 � KEY TO SOIL CLASSIFICATION AND SYMBOLS UNIFIED SOIL CLASSIFICATION SYSTEM TERMS CHARACTERIZING SOIL MAJOR DIVISIONS SYMBOL NAME STRUCTURE GW 0 0 Well Graded Gravels or Gravel-Sand mixtures, SLICKENSIDED-having inclined planes of 1. ' little or no fines weakness that are slick and glossy in appearance GRAVEL GP °�° Poorly Graded Gravels or Gravel-Sand mixtures, AND o D little or no fines FISSURED-containing shrinkage cracks, GRAVELLY frequently filled with fine sand or silt; usually SOILS GM ° Silty Gravels,Gravel-Sand-Silt mixtures more or less vertical LAMINATED(VARVED)-composed of thin layers of varying color and texture,usually grading from COARSE GC Clayey Gravels,Gravel-Sand-Clay Mixtures sand or silt at the bottom to clay at the top GRAINED CRUMBLY-cohesive soils which break into small SOILS Well Graded Sands or Gravelly Sands,little or no SW fines blocks or crumbs on drying Poorly Graded Sands or Gravelly Sands,little or CALCAREOUS-containing appreciable quantities SAND SP no fines of calcium carbonate,generally nodular AND SANDY WELL GRADED-having wide range in grain sizes SOILS SM Silty Sands,Sand-Silt Mixtures and substantial amounts of all intermediate particle sizes SC Clayey Sands,Sand-Clay mixtures POORLY GRADED-predominantly of one grain size uniformly graded)or having a range of sizes with some intermediate size missing(gap or skip ML Inorganic Silts and very fine Sands, Rock Flour, graded) Silty or Clayey fine Sands or Clayey Silts SILTS Inorganic Clays of low to medium plasticity, AND SYMBOLS FOR TEST DATA CLAYS CL Gravelly Clays,Sandy Clays,Silty Clays, Lean LL<50 Clays— � — Groundwater Level Organic Silts and Organic Silt-Clays of low - (Initial Reading) FINE �L plasticity GRAINED 1 — Groundwater Level SOILS MH Inorganic Silts, Micaceous or Diatomaceous fine - (Final Reading) SILTS Sandy or Silty soils, Elastic Silts ' — Shelby Tube Sample AND CLAYS CH Inorganic Clays of high plasticity,Fat Clays LL>50 ® — SPT Samples OH Organic Clays of medium to high plasticity, Organic Silts m — Auger Sample HIGHLY ORGANIC SOILS PT I „ Peat and other Highly Organic soils — Rock Core TERMS DESCRIBING CONSISTENCY OF SOIL COARSE GRAINED SOILS FINE GRAINED SOILS DESCRIPTIVE NO.BLOWS/FT. DESCRIPTIVE NO.BLOWS/FT. UNCONFINED STANDARD PEN. STANDARD PEN. COMPRESSION TERM TEST TERM TEST TONS PER SQ. FT. Very Loose 0-4 Very Soft <2 <0.25 Loose 4-10 Soft 2-4 0.25-0.50 Medium 10-30 Firm 4-8 0.50-1.00 Dense 30-50 Stiff 8-15 1.00-2.00 Very Dense over 50 Very Stiff 15-30 2.00-4.00 Hard over 30 over 4.00 Field Classification for"Consistency"is determined with a 0.25"diameter penetrometer •GEOTECHNICAL ENGINEERING -CONSTRUCTION MATERIALS ENGINEERING & TESTING t9e0ggro o�Qo�`P SOI S •ASPHALT• CONCRETE q y `aG Asphalt Core Photograph Logs Client: Garver Project: CCIA Runway 13-31, Parallel Taxiway B, and Associated Taxiways Location: Corpus Christi, Texas Number: G121054 Core B-1 (Length 12.25 inches) 77 Core B-2 (Length 9.5 inches) • t A - - Z Core B-3 (Length 6.25 inches) Page 1 of 7 •GEOTECHNICAL ENGINEERING •CONSTRUCTION MATERIALS ENGINEERING & TESTING e0, oQ`P •SOILS •ASPHALT• CONCRETE Asphalt Core Photograph Logs Client: Garver Project: CCIA Runway 13-31, Parallel Taxiway B, and Associated Taxiways Location: Corpus Christi, Texas Number: G121054 Core B-4 (Length 16 inches) ,� Core B-5 (Length 14.25 inches) i Core B-6 (Length 12 inches) t t Page 2 of 7 •GEOTECHNICAL ENGINEERING -CONSTRUCTION MATERIALS ENGINEERING & TESTING t9e0 ggro oQ`�o -SOILS •ASPHALT• CONCRETE q y `aG Asphalt Core Photograph Logs Client: Garver Project: CCIA Runway 13-31, Parallel Taxiway B, and Associated Taxiways Location: Corpus Christi, Texas Number: G121054 Core B-7 (Length 18 inches) Core B-8 (Length 12.25 inches) x r" h1 # Core B-9 (Length 17.75 inches) Y v_ Page 3 of 7 •GEOTECHNICAL ENGINEERING -CONSTRUCTION MATERIALS ENGINEERING & TESTING e0, oQ`P -SOILS •ASPHALT• CONCRETE Asphalt Core Photograph Logs Client: Garver Project: CCIA Runway 13-31, Parallel Taxiway B, and Associated Taxiways Location: Corpus Christi, Texas Number: G121054 Core B-10 (Length 12.5 inches) Ilk �r � d Core B-11 (Length 12.5 inches) r. � i Core B-12 (Length 14.75 inches) w � csAl ,. 1v, A fi+�? Page 4 of 7 •GEOTECHNICAL ENGINEERING -CONSTRUCTION MATERIALS ENGINEERING & TESTING e0, oQ`P -SOILS •ASPHALT• CONCRETE Asphalt Core Photograph Logs Client: Garver Project: CCIA Runway 13-31, Parallel Taxiway B, and Associated Taxiways Location: Corpus Christi, Texas Number: G121054 Core B-13 (Length 16.75 inches) 1 Core B-14 (Length 12.5 inches) r ad�1i , 1614 Core B-15 (Length 12.25 inches) 'v^v� • °�+OF yP wry V.M. '�'V%'w a i�.- C° ia 1 ' _'� ' Page 5 of 7 -GEOTECHNICAL O� -CONSTRUCTION ENGINEERING & TESTING • -SOILS 9 ► ► CONCRETE Project: Asi3halt Core Photograph Logs Client: Garver and Associated • • Corpus Christi, Texas Number: 1 • • (Length • � • >'.��'�., ��w F r �S ��,� R ill ,��.. • (Length • i (Length f $•w ¢ •+ �,t a ./.;.* �Rc*��• a.) ..•�r t••Ii � -,:� � `-�* t� Page • • •GEOTECHNICAL ENGINEERING -CONSTRUCTION MATERIALS ENGINEERING & TESTING e0, oQ`P -SOILS •ASPHALT• CONCRETE Asphalt Core Photograph Logs Client: Garver Project: CCIA Runway 13-31, Parallel Taxiway B, and Associated Taxiways Location: Corpus Christi, Texas Number: G121054 Core B-19 (Length 12.75 inches) y , ' '� � •.zap` ��'�� ��:a..► b �M1� . -, W Page 7 of 7 o Owrz �;ud� SVX31S, AIIHS U3POO o � �m �wx�� I1512/HO �(7d2700 f� .11l� �`Q OiFN� NOIlV11l18VH3UGH03AVMIXVl 2 IUOdUIV�VNOIIVNU31NI I1SIJHO sndwo `^ S -777 ¢� KZ �U _ Q WU U \ o �Ll 3 OZ Q � c '0'°N i L6 co co NI" ?. ° g o N N to U- d cr 0 o °D O o ~ ~ OD J Wuj Q � co C6 LO co zQ wate, LO _ w a z o o = a Cl- a W M co CC (D U) _��NJIiVI., 10 nYJbd¢ aJC'uJldtl= m R m� x.�avmrv.a _ Cyr L rl o c ll l t q cl (n g�U e a w O : o a 01ae—'o a ��eadw,0111 s 119,10 5� , W�oN_�e�osz� � a�4va3 �dan�ozo_znn�o a��� SVX31S, 531111NVN0 d0MPJVNPInSB X30NI 133HS o � �m �wxaM I1512/H0 �(7d2700 f� .11l� o a`Q �iFN� N N0I1V11I18VH3?J 0HO3 AVMIXVl 0 2 o 1dOd2IV�VNOIIVNJ31NI I1SIJHO SOd JOO-777 `^ S w p m m Si b m LU H Q z Z CL' z p� d' V W ]W �F ° m w z z w U W qa F p w p m Zp ~ W z= (T7 m ¢ W 2 O w a~ U �o 2<2 F d Q V zm Yw p z Z z a WZo� o Fa W Q Sg ti$ 9 w 8 N F4 9 § m .w r11 LL _ °�� �w N$ a gv aI= haw= p arc `�� > a p o c�[p u w z `n�mo w3Qo r ] 2 ° m z F Z w > f7° (7¢ F ',a❑ �~z° O� qa w ~ w��ay y 3 �i'O 3�t 3 pw wt�fw Q Q mi °�wi Fw °a m "J�w nm 5 wro aa'o aoz Uo'ra o °'a ww �� a HUH° °m W. °z?pU zw u c�c°�13 ci LU Q w z te 0 cS S ci C� LL O Qp Q c� f N 8 •`! `��. R 8 Xi G Z Z J a 3 3 Q 3 °J N 3 m ra F m m LLI J z¢zz y _ > w w w aa w W Of ¢ w cO p iw I as Q wLL a CO 9 wi < w W Z a oz O mO W. Qwp ° aa9u Q a ¢ 3 a u �zQ gxC9u c7 a m zw z_ ° Z z cu� _a Y Y A f m O m O c4 0 a a s tpi a > a z t� o H 2 0 o G Q Q m m m m m m m m m m >o z z Z.zZ.z w z o 3 ¢a x W cr a a a w w w w >o o a o Q Q o o w 0 0 >c 0 o a a¢¢ w__ > w w N w a a>o a LL¢ a¢¢...x 5 w w a w a w w u a o !( >>>>FFF z nm > a W > a wwwwwww ur u,wzoaaw > xa Qo-° w o f z z z z z Z &w......� o �oo°°°°°wwwww a� ° ——---sw�� N °�o o 0 0 0 0 0 o z w o 0 0 0 0 ¢i a a¢a a¢ o z o 0 0 0 F zwwQ o �'<� 00000000a3Bw�aaa��<<�� W i o . .....w w S a o Q z o 0 0 w m z o 0 0 0 o z z z z z z H U Q Q Q W >w o' z a y h o 0 0 Q Q Q a Q w a>w w w>>>>> w w w w w° o>=a N o 0 0 0 0 0 o m m "w w w w w d x>a J J a d d a d J I Cluj S'o o B o 0 0 0 0 O o 0 0 0 22 MaPem JB09 Oµlt Y/0.S4aW� 3vT'r d��4d.<a nH�u,e ua�/.ep�yq�q�Wd OC 61 l WLODI�[L6u05Z1 I 0\9 4�J 3 1 d11'J tGOZO_Z BOtl\sZOZ�N eI!d o S = + w z SVX31 1NOAVl lOXOdd o o m �wx°"' I1512/HO 5(7d2700 f� .11l� o i'`4 s °iFNLL N7 NOIlV11�18VH3?J OH03 AVMIXVl 0 2 1d0d2IV FVNO1lVNJ31N1 I1SIJHO snd o-777 `^ S NOIlOf USNCO 21o13l1SSI 9ZOZIEIIL l VdOd ROFA HdOT ROFA VdOH ROFA VJO2 VST RSA VS? RSA VST RSA VS? o p _—__ — gE-HL AVMNnNN?J v.---_--- VS2 RSA VSJ S ¢' VST RSA VSA 3 V3OU ROFA VJOA ? F/{ tld0}J ROFA A V101 TOFA V301 III TOFA V101 SA VS1 TSA VS1 TSA VS1 TSA V AVMIXtll V AVMIXVI tl51 � /// TSA VSl J tl51 TSA tl101 l� < / �FA V301 �tld01 FA tl3 tl101 r TOFA Vd01 V51 1 TSA tl51 NOadV VO 1SV3 D D D p I I —J o I Q �a a�z Np>2�� I a°g a Inn yP < no yo a oY a a z D DD m d� rgpz w w w w a dyY yp - x5 Q U z F yP ayY LL I o F \ I 1�% OFP dy-D zo U U O � / c ¢rwi� O �<tt W WZ y P b dy> °FP P 1 / a z w w 11°Y / P 0 a � w a� w w w w w OF z ° o 0 N. w w w. w O h O LL W Z z w wZ > > z e-yP W �_ o o> o° `3 3 , , oa P °�l�P dyyO P a�o� dya o dya / o N F / �✓ FPLi �yP Y 0 Py �yP �p P oa 3d��iaew�w'eo end ewRea�w�a�wv��a�ezazi��u s� i P�ou��evzosz� i o�v 4n3 i day�eozoszeov�zoz�FT!� SVX31S, NVld 10?LNOO A3mns o m �wx�� I1512/HO 5(7d2700 fU .11l� o .. m� N0I1V11I18VH3lU OH03AVMIXVI o 2 Q z m l 1d0d2IV 1VN011VNJ31Nl I1SIJHD SfId o `^ 5S RDA 7121 D D O A O n n > z z z a a a a o O Z N tr ¢ N a O ¢ ¢ w m N OM1 uVM ¢O ZO - 0 0 0 0 2 LL ¢ I U r r r r ° 3 . . 3 O z -. a a n z 3 Dn Ll.l - - - w w fZz o p m71 < ¢ - - � dMl I I Q Z 0 ¢ Sa > K Q UUNU W U' �\ F \ ¢ O p O 44b Nw � J m0 ¢ I tt u IN NLL 16 z Ot�n Om II D kl �a a� ma f N of <o A z 300 °Ooa 3�o wz�za z z�z o \l M1 I > � m O aOZz 9q�V�01 wp O z I� ] Z'o> OO�m �H NLL F¢ D K O OQo Qy�Z 0 TSA tlSl T Oa N p W w m 0>> 9 o'AO TOFA V101 TO F Ztl M >Om � + V401 SYFA O w� 4SDL11D+2QL�04+anL Q9±8QL00�LL40 L44+2LL_49391�00±2LL00Sy 40,z"A ry tt m O d O d u., ¢mUW OOOW 9O9q b (VS1 TSA -3 AVMIXb'1- VSl Ty O O o z z w S Ol TOFA tld01 A yp K U H m 6 >> Fw00 0 U S aUU U¢O¢ A p w r 00,00, .00,0 00,00«LOI n n b OV Ts b i w i w W O r ¢�¢ p0 O Ohm FO z� NF mz- O n MW xz D �tt �wOo a¢ w K N rn� wj b� TS F OF OZwNr w q � IIII�IIIII II¢ ¢ U_a>� �NQ Ow-z�� _Owr Uw z i ¢Oj b 6S \ K JOOmD wz F wn�> ��N¢�p ww UW¢om�mJ oz� xzmoU zQaa" oy £tl Ml�. w�� O O ttOZ iO�xw O�w�-�� Oz i�zz��w-z oz Z, Ho ,p ybaiy \ d�D1 T"I`1II t i�w�zo>wwo =zz _zw ooN oz aay No¢i a� tn¢m ¢ tnzz fGa¢ o O mug \\ R DMl D 11F'I D ttW�¢m��m ttWc9 mw K�w> ¢DO�W¢W�OJ - S,9 OZG<tto.1O7 ¢ OO p�20>� �O�K?o�Ko¢ ?Q 0Q �HFwz Zww �zO aa� .6 °V� v~izwWv~10� Nw . S,9 zZ �w �XK-, w20 � OOO�x_wx OzrY amF ZO�Z iOZaoow, J6w yo bsb Ro \ o o w °aao��a� D¢a aco D °a <M ¢>u_ °z M e H Y q° sy q \ y 0y O btl NLL z w w z ~ tt rr a w a w mod, \ bs w Q a w Z KT Z a _ a Ta LL z d K ~ w W w z Ap Zi O O¢ O d N O N O .Ps O v° - v \ a tt J b 11 p yasy�a11 3v T o'0laeyalw'u e10q uoycep0ry�q�la�Wd tzL9Waal6L�v9a�e�s�eel Vlou_tt6u0sZ� I aL94a3 1 dao ttvawa BOMRoz�-N SVX31 o S310N Wd3N30 w o m x°M IiSIHHo sn&aoo t� Ailo NOI1VilTOVH3lU OHO3 AVMIXVl 0 2 �. x¢a 1d0d2IV�VNO11VNJ31N1 I1SIJHO snd o-777 `^ S (w90J awN K om "a a 2m �G = w OQ o-,, o iU Ki 3- Ooz¢ J m�i���6�a ¢gym ow iOni 6 m �OOww pa x r� Z� rciKtim °OU(n!n?�wzax�i wZwxQwO wwUQ uu�~www' y(nN0°z w d�~ Oa Q¢°�~ - `mm'dz�>m ¢ .owoz o�zwmm °wFU�oz��O a www�z �wac�i�a� w3 o=w = w Gwave waF Fad o- N=�w-¢mmx - K�sT, ��� �o�ow=max=> sQ",wwio�w°m¢ oorc�zaow� 'J`c'�a�wxor> �oN i w w�wy wrc adz~ yp�m�w rc3a wo LL 6zma��rcLLF�S oowux°o°mwzw mw> izaw a �� p mo�No�a za�a wmowwa zzz ¢ �o�am�mmz�mm _ aazwwzaa u�wg z wa rc�zwwzp�'w °pmw�a �o a° cau gym= owa dew°zUw zmoxwoow_�,zwN yWJ woN�3w Fwwa ��°z °wo,aJO� �paao ox°No3i� aoQozo? -NNzz? omN yam>�wu aawoFmwa wpwopopwowd oww�oo�a�oQo _nwwo°za paZ a�LL � rc�v�,w¢o°u ozw zN oo u Jazaw zN�o�mw¢>ozN >ww 3ww r >z� �w o o°w oo¢zz ¢w ¢¢ F�as wow° o�w,owa�aN w ww'�wwm �o=� oa~ azw9�°o oa w� rFatm�z LLowsc`�oyy���� zmzo>>c�o°¢z`w ow~w¢a3U° om m w wzmw wm o -� z oa wow_ 3 �z° of wa0 �rcN�� ao�oZ o - �F > Fw °_ p� py J ° w po 0 0 oi3 w om-rm- aado?LLo ap mo Qua LL w a°Oc'iwam °3w pz�aw�� w�moz attawmoN �Fowa ai zisoz° aorcwxawwNw z°°O- `�-spa wmuu '¢LLawzo LL��o o° r a°>N� rcwww�o-a N oowomm awuwoa oar aaaamx�_ o� _m����w o¢F Qaootpm0om a ww wa �Nm°1w o z~--a- a wpw�w° owmw-xpm - o wzoz�m zuo ��zawNmw� d ww¢ 3 wzw>I w-, mw�m ao>oarc wzw �a�wi LL a¢Uz�mwaao�wa wc�w°'a�zm w �o iao wa-�o�° �° a� a�° o>wxompaFw m°�F x ozoaa "wQ�p r. ap i°u°m wrcFQN�wz - �wow��mz ow LL ' raw pwzo�ww w,zw wm x p �_='�zzwz °N °"'zwx- ¢gz ooz-m�mm xoo omooW szaa m oouao o�Ya _pazoQo -aoiam� 3 opFsx�aa Fz ps-m aow ow- oa°mxzmm LLw wow °�u¢oo ota zo�zprca o mos °wzmw"m� wmm woowz o>wp"z� zi°�ma w 3�U w ¢wQQ��os n Nz _ wmw z�wazwtowz°m uwmw oo°'m�w �zUm4�amFgop� w �aamw _ 3Fw i LL"� 3a a wos - owaw woozova az iaz� aac=oao°wa�w u om�¢xao�N awo �',poF= �wox°rca �owzc�izo �awawoQ °mwo9m _NpN °tea " wo o LLz wawa NNW 6 owwo°���dppw og�z°z�ww° ocwi oaz°o o° - J mm iFamoaao ° mow�_ w°w.w, oho o wave Tm � ?'oo,g w° ��aoi?��mwa w¢wawownrc'w oo oo�amozomwa dJpoNawia _a au - z��o d°wd�w - ao� - x�a z �wF�p_pmo¢ aq�um=mro w� m°z>orcua�awys °w�wUwi�oa w - ww wom -mow w� oizp _`xo ° wooQazozwaoz �owwNo �o oaiwaamow�Fw �ooa¢��w� o'o wNiraw -wave= 33a_ Js�ooz _ ��mx°wiaiwop-r - �m w d�wz�iamozN ° o�z mN w,w�omo ooa"w- z �zw°o 0o Yaaomo Uo° -oOz °aa�a=o Y�oa so�N�oaaoswF -°owaw?=�zs ��soo�,m„wo �°xoaz-°°pz� °�ioFJ>zi w o�mnzN - w wm>m ° c�i¢�m�� -do-zW_az - - °w - aoQow�>�Qos'o o�ato�oc'imowm �o�ia�wd z�wzzowoww�orcw°wQo wc�oi wocJi �oz¢xwz°zOowa - _ oho°o wmoFr�n°a - zo�zm�mwQao �, LL>x o-oJaN ozo�=z�� ¢ zz �oz m r¢ w gJ ttaa��wrN wm�� w wwFp -p°� �c»u �o?¢�Nab xpx¢¢m�rc>a¢a`��' -��w �KQ= OwmU wOKy oww=zO�LLw¢~¢>O¢ O�FKwuO~ppOw ww°KLLKymwOzoO mwQFUw¢w ~LLtimztt KO� OKC'Jmz m_Om r-�Ow�a m sU�nOw °U�O¢O� a it tiwm>tOU� titOao��_�O¢¢O ti(9 vai OUaGti asK�� aaa�zOU tivtia=oaf pw m U a ww m w ? O z¢ O wp �m >mp - K ZU 0= a�x¢O Or mi m zZ 00 rpp�YttK° ¢ O O o `'m'uwU,Ow m0 F wo ¢O =u NOiw w m Uw UN O¢i-w wr m w¢ z ¢°O O ~ wz°x pa ¢oow�rc�z m° m�o 3m>o�°o °wmm =,� gwz�oga ww° dawj >O °oN< ° wo °� °z rczaz�w �o�a a°a t zoww �oz ww�m aoz "� 1 o m is mare°°� oz oyzm _wi wo °�z000m owz ¢wzi mew x�xo ¢ tto m'� ww �� �w 9, - aaw�oo mwwi w- oiw zz - > m m rc o oo am��m i �wozzwwma mw —OE -O-�oaoaJOwo-oyopw�m¢tt°wa'o�°¢a¢¢a�o -ioapamfw`�°��L'NwoNiSo°a=z°zwxw>�aoupoou�oiwmuz�LLa�iozwmy>oouvOrci0�o�6mowai��°zo�o�LLmo,oFowN'o4aaZ�°ma°���Qow°¢majm°a -�io�mzz-=mNp~LLzro'o�w� >Az¢zaw>woaOwmuwOo ozwwc� zzw.o�_svexQ¢�o�mrow z'=Um¢>�.¢w�oumam.xozw~a��zK awowo�ow pw om��yF z¢wwm_'Qm_��aa aa�>awoo o_md�mUmzooiOi o°ozw°w�N��o�owo�atJLLooaw_vxmzwoa,Qo¢Npu��too��mo��owo'°tmoN¢av��i om,�ww o� oa�Q=owowLLooxszw°cwi F w°LLo�w�p�°oOw ooewmzw 3N'�aLLa��wrQa 0000�LL o°zoo°o"¢N op m ozw¢°zwozo awo m w z a aoa 000waw°c�o?i_o�oxoz��<m�-FzWooaozmwzza�o°o m ° im zN am a 000 wwa�� ooW oJa�wzotw� �O� ao ° ��o wwm a=o�awwu� F wN - ° Ez� vex mo W ¢° tzaozzw u>°�°rca o° rc �oza mwF oow ww o NaWoo _L ¢ww w¢�wow�' <w ow N�,° °,Op LLw N ao' x�F°°zOa�vmwznm�LLav�g°z',i w o z° w< oaoo ai mi z1a E mU� oo°o ° wNpz aw3O w° �m mw 'o NwP zwa o ¢ ow wao LL � w ° zzwxN z o < m a z' m°o a 0-. °rc=' 3a � w wmo=N w° .2E s ° FO ' Fw°w1. I w °z Iow o° -z oi, ° a- a- w a mo � -Q°w_ o a2 m18 o0 5-pFwEw� 3� wQpp O °� wJLL �oFoZ m°zow '�� tww _ 0 m w Uu ° >O�md�¢mz°-c�owoz¢CgyMo`a¢¢ui� a w ° o m oo Mz ve � z zo mwuwmN z - ow ao �drcorc a En 2 s _ 6 w w Q+ g o Q o z° 0w pm rc ° w w o �oN y w oo rc mLL www�o z oo=mo°� w °o°° °ovw wao ' m um vd 39 :¢ I,, —9 u >wwiwmo�0NoOox°,w'L >o -�°Qaw°w�mraww t�FxoQgyi.�, �pm°x ¢omwrcm-g_o�owmQo¢-awio�w�mzw�wmwwrw��zzwm m�i��wmmaow'co�'°o°c"Uuaawatt�i -=°vompF¢m°g���omammop�wrcogLL��so�ywpa',owa���_o�oz�J`izoomo"z='wsy�oomooUgryai�m"o= ° xw Qo � a zaaw0rcN�a-a�w�° oa_o0omUpuow iowo ~za < m 00v �8m � Lz at I �wwz o ozJzw - a r oveo -J 7,o aw `xzLLoa w .1 w owLL p mm p° oif oa . Q w ¢ IP iow- V 7zaz zo O o pozz ¢ wwa o0 Yi o Irco xw 1 z z w Q w --w w pow °¢ ° m ozo ion °w°nN= 11 on>ai� a mN. wd ° . - aQ ma F�- ¢ s, o LL ,Qx zm na NQm -wW awO woa ° oo9 poO � zo O r OF w w' o zQ o0 0m o > a¢ zzmz B 1 oLL aN,3 °wi ax z pa u az M zoyio° a �LLo o rcm wo p--wm owawaN z- oa zoi a wum�w o ¢N ni aw- w aa �- w i°z O woo < J� rc� ° 'moo F° w< w~J- x o a o�o-> Qo_� 0.- ° � o t w° �ao�moa .a i a uzwN° sn oio aa w5" ,N `, w woz,azp ¢mox F �Nz�° °o"�m > Na w po p m1zza-�w ocww v ox pt° a row1,m -mF '> LLo a ow °" pLLm � zFoz, j oa�Irc ° ? w ii mmoz o wo�zzo aw ¢d z � Jwz ws �= yo 00 o3 � o�tn ,< ��ozx�iI y I aW mi m ° mzI 00 W. o0> oz � W. ° ��az 0 0 0o zApo _ M w J = �,00 o 0o 1. ° � ¢ zz z f � O 1 oNUFF o� o °o ° o w oo � oQoNo oi oa -aZw o7o a r ° 3 » ra ¢ ow 000 i¢ 5 ip¢mJxmzw� 2 7 a 3v '�iaeu��w'o en o�w�w a nwvw a�s,.asuv s� i v...........z� aw 4aa i am reozo_z eomszoz�N T!d SVX31S, L S310 N'ONISVHd ONV A133VS NOIlMUSNOO o m �wxoM IISIHHO sn&&00 f� Ailo o �`Q a uiFN� NOIlV11I18VH3?J OH03 AVMIXVl 0 2 - o 1dOdlIV�VNOIIVNJ31NI I1SIJHO snd o `^ 7 7S 0 m O F O Ow J w O O ¢ U r¢w/i�cmi w �� zr o ttwU r �z! Fpz ott - Fpa m w m¢ wOW� o>F- tt z°z Ua � °ao' o ma moo om a o w oQ� n °o�w z _� �oa� a° o �a oQOz oom� oz zw�a m - �o zow z oozz m _ >za° wwwF o a� <owo o W y m�� w o cwi° ao owe o o a'a oz ua�o oz wz o> w a ory >wo mW°s ° azFFa aw s�>4 ¢u�u r. ° oo and wrc Q ¢ww o a Izx rc omzo r _ w. �W°o ¢ ou og md¢a ¢ m =�z yzao 'o a o�az J i� °.� _- - w �o �z w°O� r az w a0 PQ� ��w �y uo owI= ° 3 mo LL ° ao a Paz ° °o� i �� a i oU �W-cai zw>o ow apQ o 00 _ rN� a oo�o o �O a� Qo?F = azo?O 4zQN viz o �, a- o o¢� o wosw um;a �z �ww3 0 oo QzwJ 3Wwo 000avi m ° ow o . a ¢s aw Woo F zor� o_m° Um a io-w o o - a� yLLa n Z. �w' o aO rz o y �. aaaw o ww w¢ - �Oa o ?who oW -o _zoo 0 0 z _ �w - oaw a7pJ o0 oa Qo iw ���r ciooF �m i° oa w'o 7 z o '>-` arc° m o°pa > xU zw �° �>a� - - Fo r _ - zm o >i� �o °¢wa - am - or "awe �zpo ow 0 0 _ r o 3 pom° a �° °¢za LL °Fo ¢d>< F wvax�w ° �OMy o - owoi = ooyW s°w LLa _ mo <� w2�o xw - oc� ° wo ?tea 3or - op pi�Oa>�aQieo;ow�mLLmj'aoua�2��oira QWrttuO omK Koair ��Qa°��Oyw aw~-°O Wa `p>z'o-o WG o�wyzdO zJ�Nvwi�N�~No�� r aa-°mw� z?zmQ°�m�H oaaWw��a�O oj°w o°pOa wr O�K iag�i a�uO�QoaavxOi"JFwm.wOJDm� ¢Q ox�Ka��0° °aoF2omNti'��uU¢wuFoQwrz0KF0 =�waLL�-ZU�z��wmcowWNrw� tw w ao°a <°3z W° _ m FO u �Of�aza� `z° w°z � ozai n oa�Zo o °w aZU w G z 7 2 aa » ZwLL z -0 UZO > w ZK F � yK 2>¢ tt °z 9 �w0 _ Z 6 � 0 U O O U � U � w z_K H 0 H� - - a�?uO z-Wa° mmri>�oR-Qy�>�¢��iva�i QJoo� ~xd Q° (aKa� >Jo pwm Oo OW aomarLLFzsa w uol 0zax0z oLL a° O =z OK�JOrF Og�Om UQ �zNO gNV�o�rm�wd�riw z - iz�°ax'sFOr° I�wwunz� x > z i �?ia w am o o o �zz aJ - 703 f 0za w 2zO �� Or° zOz1� � Zp 0= 0 r Z z z Q w ODU2F ¢ Z z0Jm Z O Ua N oOWQF ooiz W, am u ° 0 i co¢ o swwz°ooN'opaoy wrwwwio�imo�Yw3mzw rc wmWi�NmazFoozJ>- ¢ywz i w¢o�uwn z'x' o°aw ww�z�omo-_°um°iia�aow azaoaw Um���a>�am°zr >zz o w wwaarwwd�w°oowo ttz ° °wa -¢YOa W¢wom ¢ a ow°a aa�m Z. 3z=<>W "0 >z aaoammo.QZw ww,ozz Woz �� o' oo � zz °o2Wou Ioo rwm= o� w ° owwouawoa 3ozIUz aJzr aLL =mm F m°ZV a W°i o 000 �aa way° 03 �w ro �wWo m >aQo� - °� m arc - Go pi a�3o a z o `x'aw ao �w3LL =zd orc-2 z xamw u, amo o _ w 3 ° Quo mQ"ow r3 �a�apo o �zm - wow ova, �>a� o z au,w �woi wF oWa z�°� oz o�ww �o="u zwwwwsw o?ao ww y3 -� a°wz v�i _ Qz wi°w wwrzerczarzz - �w°W W. - a 3 ooa w o� o� z� aonw a� oozaoFw po 000wmx_ r ° rN uo�� oz zmaoJswNw>o -rcua zJa o o �wm dowow amF°z?aaLLax o3Qw- -a�mzU� mm°i�?www�o >aa m aJ-uw�aam d w°m �uw, z7-�o�< a° isSa� m aooR a> r _ w o Mi oo w- Wo >a s- o F z a= z rz¢- ?mia r oY w°mQ Z. °°zw� o° `�oi���z m ao w x oJ'a rr�raow x_w ampmz oQ ooa y �° o Y of _z-- >a ��oz °Q¢z m am�� _ a Q�ozwzm aacwiw r x�rcz ovi°aO�a, wozmw omma o°-rooi '>¢N° r� o �idwtN9�zsJ¢0 zarc°rci-iroua�zOQ wWaod zrcwwiwa zw°Q�Fa r000 mz z-0u _wNLL mo �w'y�- aomwa w?>zo�° mow�-m �°od=>tQW�z _°mo°zwmw-a°w a?wF°¢�oa `Wawm�'uz��¢°aowO�xLL aw�WFw u�Nom�mmm owmttxymNvo¢�o�o�v°o�ai °zaa°orc ou>z°yQzo,mmocio°mN 3oaJ yo°mJ o�ouoO�ox7o�m � oayo > m? o E�t. o° F o ° Oa"T90o °Q aa° o�o ¢z � �o ¢ am o ow¢z zo � z oz r�-_wmoo iw awzw r z > azu azY g �i`o0uw ooz z-> ° 0 «w3a0, w , �rz; ow 0 ° mz z u iwz% uY°w uw 'W-°a-pai6 o , owzIw mw rw O. UZ -Cno Om rvUt oN mO w �a - u0?aawxror Oo a �a ~°OO of a $ vaii m �° �7zp w�awwv �a =3-o w>. zo woF�iomQ�� .Pw 9'F'. ° oLL°zva>,m=zw of pow �Qa iw ��oww-wwo o-"Qo« 000w �o i�a3 im '�¢� o w u° a ° _��zc�i "w<m �Uso ¢oWga�ozu zWaz°yz w �aW wo ud �0azo oo�ohz°o_oorc° 'xm°°"oo�o�4a�z arc_ww'd zzwwio�oLL�wQzo�o�a=z= �o�' aa>ss� o°aa °wawO Noa'u o>zwo °�o�oW�a�Q�4rc.zLL=wc�i w d000wtt�rcrc aw�aowawom roaUa o�,L�az¢i�JQ�w wQo m am°N° z �wazm i°°z?zz xo° �o`'i° 8u>w.woi �—o65, imw oWa > = t o Y ? aaor ,o °o z�woo¢omoQNoi zLLoa: 0m> aFa z - z mo oo wzw m >° � aW ° LL a o Iz �oo o°m oa z w �¢�w � �oaN x W m� a J H a w W u ° o >N w m oo �z a zio o F010 z. aom zz > > � ao?oas � o Q m ° o m o a d m a ALL-z d m o ° 3v '�iaew�w'o en Vw�w a�nwv�ra�s,.asuv s� i v�aoa rivosz� i aw 4aa i am reozo_z eomszoz�xT!d SVX31 Z SMON ONISVHd ONV A13JVS NOliz)n J1SNOD o o � m �wxo' I15I2/HO 5/7d270O f° ,lll� o NOI1V11l18VH3lU OHO316 AVMIXVl 0 2 ldOd211tl�tlN OI1tlN J31NI I1SIJH0 Sfld JOO `^ S U t j OO ¢ Ow W W z0 p H o w w 0' 0 0 3 0Iz z ? I a z ' OU O i Q mQ °2 N m Z. w ZO o O F O U i G O - -_ 2� O V FOQ � F O ¢ 6 O 0 w w O O F N aw z - O 00 _ ~� Q�d LLI w LL ¢ �t apa s ¢¢ w 'n `w aLL Fa zo ?Qo ? > 3 o � w o LL wy a o° z° o LL a ow a tY =< o Qa= Z a °N w z� a o a ° - - >- - w� Q W 0 m F w z a Q a a a>J w z wz, wz, wz, r a aw °z a0. o'T ° �. o 0 6 o z o gm o �z of mY a z Q _ t a� w oz -z �F o wi° a _ o y aw w zoz wo o y w> o �W NWT o 0 Uz ¢ oa oZ 0UmOU oom=° z aU� °w �ww° 0 »O oNomw ° o o a ma ow 0 zm 1x¢ 1 > w z > z a wm 5-163 0 zw z iQzw zI a °Yw QUU O Iz ° a0 JO Q w ° zoW�n wa -j °wUU ° w i H J O o� =vwai �Q ° wo¢� iw wk�m� k 'o wx¢ �Jz � wxwo�°zw Jo�o��oeOwv,Owwow °ow wJow zQ ��wawcJ-i w°wwawo aoa -��gyY-Nmmo x3o� id�°oa°uaz°°ox Z. 3 makz o�-wz�ow mz or-a 0 F0 z �xw zwoz_ LL�z o°o o �wo�d wa�azz°- 4owmzQ-¢w��wcwi-az w> ¢ zwx wmzo-ow 1. or ¢ � w x ma�oo w w �aa� N oam� �ciw sz - - owi°B w` a - ma ma'a o as ¢ w 000F�a>o� �~ a o Fza �`wJ ¢ oN zoz�� _ °w�u Jo Li Ezs �ow� LL xWo� ow -w-io zLL ioo zap ow-w'z ¢O`�a 2, _ ¢Q on o ao a zzQ W�° = rc �o - - Jib oZ a woowo a w w w�ow�wz _ goo - wa riawa°a - �oz - o a o o � woFw o �o w ww - w�Uz oao��xw 0 I ZE w oo�o wwQFa ao °Qo aj oaoaoYa �ao wN°� a aoz�o - 5 >zz °aza� o oo`�'z doaFwm� w5 o a a=° owwm y wo F zw- Ja�wo- _ zw 'o D¢F� ioLL �o �zLLr mWN vi`��o�p z _>wm J N wzw�Upz ao w°w �o° N1z z z° - zoo�� w¢� w zoLL- _ w m y tzo mo2oz op -°w �o�NFtww owo o�Qo w z� oLLo �a>o w�zwa>>a <Fo a �o NOLLFi - ¢d� �~o� o _o a waN >wo mow ��oww �a mo zUFU �o�awwa z >ooi °tt� ° �'- �a amo m¢° aox w�w �a w z z �N°Y zamoma owwNw mZ Uarc .Fwm��umow° oLLK°o~zarzQo°Zma�dwQ w �oz�x�zm oK��m�o� U_��ca�wwiF_w�°mw>oa����op�owo��m Fwi�¢w��oo�Q�`oo�F°¢wwwaw°wo°ww°w�m°v'i�woa-oo°omQ�UO woow roUa ,3w z 1.,�, W. -ow o ¢ ° wW a z WozN a,w Wo wJ>N g ¢ N �= a w i ow zZ amJz o o °¢ a a z > 9omza'Qwzow 7.°w � 1 a d w x w ? o° oon °a o -wwe o ° < Z N Z z _ w w � s z~ �Uz o3N z° > o w o ° o az wLL x ° zw ¢ a W Co� � �mx �° wi io w°��zwQ > wzwQ¢ oo Q w JoQ� z LLm oz te ow �¢ z0 ° o 0 1� ¢ >I o 0 w ,o ' z3 ° ¢ "0 oo g m w ww � aJ � wQ OOmoo o a a Owm I.W� Q� om= o Z, a 3U Z� w U o xwmm 3v� w- �w w a nwv�ra�s,.asuv s� i v........... � aw 4aa i am reozo_z eomszoz�xT!d SVX31 M31 AU3AO o WV ONISVHd 0Ntl A133VS NOIlOIlU1SN00 o � �m �wxOM I1512/HO �(7d270O f� .11l� o t V'4 s °i NLL COI� mD NOI1V11l18VH3lU OH03AVMIXVI o 2 1dOdUIV 1VN011VNU31NI IISIUHO sndwo `^ S �. TT., -V301 - TSA ----Hsi `-g TOF v D° w O C�AF �w I �ww w ° UO FN z Iw O o x0 ��� yN O z 00� ROFA VlOU ROFA V10U ROFA 3NVl UVONVH 3AIU0 IVNOIIVN U31NI RSA VSU RSA VSN RSA Q LU of n e Q ------------- F CD _____�__9E-Sl,ltlh1Nf12J__'_ I o w> mz Q z ---- - ———--——-- --- U) m yo .v O RSA VSU S N ¢p¢ w w— RSA c > 0= Q �OQ 3OU ROFA V30U x F U U a-V w ROFA tl101 TO FA V301 �i — Nr VdO1 D°Q - Kt9y O �mwm KU a�-w w>Y Oza Ozr r U. o0 VS1 TSA VS1 TSA atlSl TSA .1, U.- O 3 r 2 z w .U�y V AVANXVI tlAVMIXVl �¢wz riF jFJ� aU wKOo(9F wm� a QxK z O �wwtwn Op�� � H VS TSA/// TSA tlSl UK w_ Vm-�fitZ OQ�xUu��wQKy(LL�JOQZ mFwzA tl30 tl � J a� ttO U z 9 ` O3: Dw OQ rvyia Z�� v=i0� w _w y rwadnO¢mh'H Jm _ °O Qz�mZm=�K�`Q>�z U, wU OKZ wQ OdpO °�NOLdV VJ 15V3 wOz o www0O yD LLO Q2 i yQ �nOKZ SQI mO�z� pW� =�pOWQ �Ow LL UUI w T QF wUwmK w¢Ytn >'ziwZO - - w (9 K_H K U tt N z w O Q K ¢° O K O O S m Q I Q o Z W s 2 x H K LL m -� aQNO J �:.:.: N ' UQ w tt� KOy�- KU�� <<zzOw Zmw w ¢G>m �c_O yz mwm OU OF�w Fr� 0 hK �ttatto ow wU 003W, Z w�a �ooa z� a z o- w,�3� °>o �LLwzo zw> °I4��a ¢�-a °w°a �,¢ =w3 ¢ a�� oa ° ° �zD�O oa�a �� zau �w�zdow Now �m ao¢ No asu°iama _sa u�w <UW m D° O�ZU O OOw °a °oo� �w Q Sao Fw of 3 �w L' ° D o y ny pa 0 0 0 ¢ D D' D an wa 0¢ d�oy z z ao ¢ LL m of N3 m dy tt �U r Q Q z z aOF QP D D ° or d�0y �/ a a LU IS o U �' HD �P 1 ay O F F a a0 I=�a V �p d�0 L.L m a a w Q O wD a , > > �a > O o I a w Q� w, w w >o oFP � z U w'a o f — � � � a as aY° `ww w s > - -O O i LL a o aO Ftt a a a z a Q z a �riUmmNe— --,- >0 wow W,00 w o w o w o w o a¢¢D Z a =<¢ FP /OU w ElQ 2 2 ¢ - ww 'H�D < a O Z d V U V a O Z O¢ ° O¢O U �5P w -w a o r a10 °Z o O o o w 0 z m 3 3 3 3 a o z w - 0 LL W Y a a a a 3 3 a a - o J- w 3 J ao W ¢ o a I / / aoo�o - aLl g ; � O P �yP �yP I ens ��eaow�aq°l�we saes az�euv v�aw_w�osz� i awvaa i aao�oaa-a oomszoz�-N3 O u S SVX31 31 6 3SVHd A1HS NOliond1SN00 o o Q � �wxoF Il SINH� sn&H0O i� A-Llo o e. .Q s zFLL rn - ..�^6 l _ mm� NOliVlIl19VH3]d OHO3 AVMIXVI o 2 I Mw¢� _ ldOddltl ltlN011tlNd31Nl I1SIJHO SfId JOO `^ S ROFA V10?J ROFA 11M] ROFA VdOd ROFA RSA VS2 RSA VST RSA VS? RSA _ r---- 9E-El AVMNN21 m z <w Q Orr iz0 ____ o -.-n �-_--__-. K00 �w 2dp (�wd �0 mm F w¢� h�[ Z �p p0 U0o �� Jam¢ z RSA VS21 SQ 2m-tQY RSA VS?J a RA ~- a� ww0 ad ¢HUH d D?J ROFA VdO? x F m—r w-VJOT ROFA z p tli d O S p w m0= u =o n o w f Nll Qvmji zU r w vLL�i-vwi O F�QD V101 TOFA Vd01 % m — TOFA Vd01 y a U o z i a w¢ VSl TSA VSl T Z z p VSl TSA VSl Q U F m?m W O n D ti O LL O V AVANXVI ;Q 6 o—�' V AVMIXVI w =Q 3 z LL W K z¢ m0 2 F F S Ix TSA tlSl bS1ETOFA - TSA VSl p z a O Q Q O H p H¢ w 0 ¢¢ m TOFA Vj01 > / tlj01 tlj01 T Cn w wUw Q� �� z - � o ��� m¢z >6 zTOFA viol l w o,� o o m'VSlVd1 _ az w <'.6 a U zO¢p �NOLdV VO 1SV3 DDLL Ovmi FL r w¢ vide % LLo zw a wa aw ��o a o y> LL zg. o zoom a� F ¢ �z� NNo o�� io oa a� a w o oo~ z ~J o N m� �wy0 �o �Qzw_ m� wK 0 U Y S a¢ U Z K K J W ¢ ° z W J O i y OFF zm. d a uwi :NFU °U¢O r¢�O ?a a�rsi�r°U ra ¢ O¢ p NO oQ tt D y yP Q D � DO y D pY z D y y z ¢ Z 3X it dyY ,�yP tt w y0 z W J tt �j/�Q1 U D AyP �dyY Q z ND� s o w ¢ w - / w LL z LL w ¢ z aT w Y �f{/ Z SOY d`' FP yP !i -' u p a O 'd Jy yP pY Q-° LL w W O dD° J a S a a a a o O < 4 O O ,{ °FP pyP � rya IIII i 3d—a�s�ia,�reeu=,w eio ��eaow��wd sae saaes�o9Z ae�sa� P.ow.w.osz� i awvaa i eao-�oao asomszoz�:x O u 0'r5i' ' SVX31Z 3SVHd A131VS NOlion 11SN00FFIlSINH� sn&H00 i� A-Llo rUr SNOI1V11119VH3ld OHO3 AVMIXVl ldOddltl FtlN011tlNd31Nl I1SIJH0 Sfld J00 `^ S 9E K AWNM a4� 2y 7si. , VRSA tlSj 021 FU-Hp- —VAO2 ROFA V101 ¢ TOFA tl1O1V51VS1 TSA // V AVINIXtll Y ROFA V10?J ROFA tl10a ROFA >O VjOlb1 1 VSl TOFA TSA V101 VSl TOFA 0 ¢2 RSA VS1 RSA VST RSA H Q y1O1 O z 3 =U tt�LLQQ o (D tt3wD �� ° Z ¢Q¢< 9E-Sl AtlMNfld '� Q �� =� x i =p O U pd�om LLo w ww wm =Q Jo w a m RSA VS21 Is', 0=VSTJ-z RSA Y S 1O? ROFA V1O? X I TF�7 — JOT ROFA NVj01 TOFA Vj01 J ¢TOFA tlSl TSA VSl TSA?¢ K d- tl51 TSA O w z i p m0 =0 ¢ �FQO 16 �FllH O o—� V AVNJXVI�� o—� o—PV AVNVXVI o z¢ O d w>o K U ¢ DOwtt CJw Dm- O� TSA VS1 bS VS1 TSA O w =FZwtt wamm azn -O oyp Cz TOFA Vj01 > / tlj01�(� TOFA tl O z �o w1N>m ¢ay?O Os`�i w"� QWLLFamo �z Q;CC �TOFA ".iZ. r TSA VSl r Vj01 mz Q�K� mJWZOa js> zQi F� m Z¢ m�j� Z. �pw ?yj �Z�'t�/1 H� dw a OQ�LL �QQa p�w0 O�- _m m=ZZ zw OZOOw QU�a w¢iOK `iwQ m=Q=owO oO NOL dV V`J 1SV3 D D m'o- ma % p o zap=Y� _� o oaz --- o s i� op 3zzoa UZF zwoo wm� �Qm p rpFKo K p w y LLa i �� u�pw� m <� oxttzO rm0 zwm zmo �z 7oFWz >aom ��'oau mwo ..Eno o�¢ m ��w`ia �gw WHO�mr> z mz Qa p0�mm wttt�� ztto CJ zw >o� �a��� a2 aw o�rz fag s01o�z zx �< QQ gQ Q�� p moz° of o� D y > 9P D � z - tt na DOpp d�OY Z F` �a a pe dOY W w mo D/ I a Q z a �' w O A b �d� O P /r/lj✓ 9 PJ dy � w 4P K w w w p z 2 Z � O � Y w w ~ z d�OY dy P pY Q-O�P �yP Q-5P O 3 y O rQii O z w 0 O d¢ w W / J w w z z a 3 3 a a a � a � o _6 dy /o a aog ; X � �p o P �yP �yP 3d—a�s�ia,�reeu=,w eiou,e ��eaow��e�we sae saaas.o............. Zae.sa P�ow�-w�osz� i a�4vaa i eao-�oa�a somszoz�:N3 O u 0'r5i' ' SVX31E 3SHHd A13JVS N011MUSNOJFoI1siaHo sndHoo i� A-Llo 41, NOI1V11119VH3]d OHO3AVMIXVI w 2 o - ldOddltl TtlN011tlNd31Nl I1SIJH0 Sfld J00 S _ a Jajz dyY V y�z r�mY FP 00 � ww¢ ti g ny 3= P b DO 3 y 1 0 ¢�¢w OY �U z D D D a¢O Q /� / � w ~ Jmp ¢ O r¢¢p a n dyY A5P 4 r K Q Y �0 ROFA V1Od ROFA V10a ROFA >O RSA VS2 RSA VST RSA =U CD O y m Z J 9 z y > yP o za �.LL1 K D O D 1 FP 9E-Sl AtlMNfld _____________ __________ SQ ay F-3�Y wQ a m eP Q°a RSA VS2 S n EOU RSA K�[ d D?J ROFA F O m-vjoT ROFA V101 TOFA Vd01 U— TOFA VH01 VS1 TSA VS1 TSA z Q VS1 TSA Q =0 Q OFQD �FllH O o—� V AtlNJXVl-* � o—P tl AVMIXtll TSA VS1 bS VSl TSA O w =y�wtt wam� azn �O w pyU Cz TOFA -01 > / tl301 1 TOFA tl z C1m> ¢�JO — `Ao a�w°wOvwi U, 3 3 lII vai3� O Z. OJO=vi i owo�dm¢ ¢ri ;;CC �TOFA ViO 1 �cK — — zxw�> K r wj.0 > po r TSA VSl r Vd01 ~ate F ¢_ O�ozo O��r m�WzaOa >SQ ZNF Qwiw o wOU¢Q d�j� OQO�K Epp zz Zmmy H� ¢c~i��LL ajpw OZw UOw Wm miZZ =p z0 m 3Fm�z ¢yjp Kw—WO Cott z� �zp U wz OZpmW w mQ=KF LLU NOLIdtl tl015tl3 D D J i 0 >U J w O z m w a U D ~O zD S NO vnUt¢� r�LLK ��Zmh OK2 =m=UIQ�K mK % a ........................ o0 3zzoa Uz�zw�o w d rc aao ° m Kz QOFrz a>ttOm ��GN¢ yg� W>O>rJiiFO Um¢ aw z o6 FaawR a � our?w �Qu so�o�ze 63a w N z� m z o �wso 10o.¢¢ zx ya oa d �a Foci omF>x �`o�a tta wo�dwm at a¢d aia a am F-N��° ?om ay aye mOZo pF No Z o Dy U> �p z DO D yp�O O1 D DDOP d z tt Z y dyY �5P F a o a N a oe d�°Y W w yo I a P1e 'd�0 — o cO�P > O w rs9..3 y oy /J v K9P H a 2. F Q — PJ dy � w 4P K w w w O z � W Y w w y z � w PJ O a / L u m O / J .d6DFP d�° I .dy aog ; X � fff 3d A-1— re u�,w eio r ��eaow��e�we sae saaas�o9Z ae�sa� P�ow�-w�oszr i a�4vaa i eao-�oa�a somszoz�-N3 O SVX31 b 3SVHd A131VS NOIlondiSN00 IlSINH� sn&H00 i� A-Llo 4FFLL N o o NOIlVlIl19VH3J OH03 ldOddltl FtlN011tlNd31Nl I1SI JAHV0M SIfXdV Jl0 00'r5i' ' 0 2 _ `^ S ROFA V10?1 ROFA 11M] ROFA IJ.1 ROFA RSA VS2 RSA VST RSA VS? RSA _ ---- 9E-91 AVMNN21 m Z ow Q Orr iz0 ____ o -.-n Ip---__ - KKK �w 2do (�wd _U z a �00 ttm F LL¢� JDa 2 RSA VS2 SQ 2m-EQY RSA VS? a RA O¢ �� r0 1 D?J ROFA tl10?J x F —rW-VJOT ROFA op J O apw f Nll ao zU r m vLL�i-vwi O F�QD V101 TOFA viol % m 0— TOFA V101 y a U o tli Z VSl TSA VSl T z p VSl TSA V51 o a�O F m a m 0 0 o u DIx N O LL o V AtlANXtl11d 6 o-�' tl AVMIXtll- w a Z LL m O z> r r y 8 o¢ 2 TSA VSl bS VS1 TSA VS1 p z a O Q Q O vsi o p Q w 0 ¢¢ m TOFA Vj01 > / vio tl101 T U wwU =w Q�wQ TOFA— r wm z — ��o ��� m¢z zzdwi \\\ viol J W w ° o o z VS1_ r ~ V101 � a a ¢ow ¢w.0 rn�z O¢ 3yrwy U ~ Om W w =gym ¢�� Fo ��?>o �Z NOLdV V`J 1SV3 D O mU • wQ % a Z.LLo =� o J ¢ ND ¢ ¢ P. NNO o3z 20 Zoom a W D p0 Z ~J O N of wNm o �ozw- m� wK Y oow 3a� o wo mz o a¢ U Z K F J W m z W J O i y OFo Z� d a uwi �N�U °U¢o r¢�0 ?a a�rsi�r°U ra ¢ O¢ p NO oQ tt D y yP Q D � DO >D pY z D y y z ¢ Z 3X it dyY ,�yP ttLU w y0 J tt �j/�Q1 U D AyP �dyY Q z = D / - 0� w s o - ¢ z aT W Y �f{/ Z SOY d`' FP yP !i -' u p a O 'd Jy yP pY Q-° LL z P / W U U � dD° J a o o a a o 9a w 3 O < 4 O O ,{ °FP pyP � �yP IIII i 3d—a 1s—01,eu=,w e ��eaow��e�we sae saaas�o9Z ae�sa� P�ow�-w�osz� i a�4vaa i eao-�oa�a somszoz�:x3 SVX31 61IV130 ddSO o o m �wxo' IISIHHO sn&&0O f° Ailo o - C Sv4 a °i��LL 2 A, o NOLLViIIIOVH3IU OHO3 AVMIXVl 0 2 ¢ 1UOdUIV�VNOIIVNU31NI I1SIJHO snd JOo-777 `^ S �4� z W ° oU awJ z � >um js o Q ai W 0 0 Wzzz 0-w'- o�z� j w� uz zQi z LL6";< o� J N '-, 03 o W m w�o mww� W M, s o m° -z W s� (Jj ��°wm '�. aov; °� wa U o aQ vwio Ewa LL .oe Wo o-w °LL�o� umiy gww 2 w z �� m� zN� LL w ° Fozao� o�oo- o°ate W¢ �o orm - z �m zYO 2 . 0arwW �oW o°z° F�wz �zoaz ° ° A wo m' 3� �n U N5� maoO° moo . o _ z` wx ohm J o� ;s o° ommz� _ ° ow on pa ° �o H m owz 6mo YJo" w-a o a� -moo w'ai ¢off ooJww J o �� - ° H =wz ¢xa ¢ 3m> �a3�° LL _ Fa zs Fwa o 1I- _ 1I- Q pro mN W ao zQ H - 5.2a W Z - z Q W Um a0 K cc Ox G - LL U L1 zo wm x W .� ,- LL 0 .a. w < z Q Q wm wo ow LU m° i ?j o 0 w° f v N° o Q ttaz �aaw oci J 0'] U ooz mo Z ° ° w M hm {i calm Nw (n iF ww o W ao o x �J do Q� o Q= Zw _o o w, zw� cwi zz o Ym o C' ° ¢> wpm ��Nr �zo z az Noa�> o o ��07 Q°O°o - o c=i Q O F V vi 0 0 o w i w F o o ° ° p Q o o? domes >y =F a a y ¢ -�zao aQ Jooa - QOW�_ oa oa F w� a ow ¢c°� Uoa F� wW um mmLL J F 112 a az o owcwi L o�orc mp a oao'ow m° mo° mz ma F°a w ° wr'w 'o a Q o o t r a m ° °a a W m O - ° g Y o 3 d o z C� 'w�u- �o °O�- =allow m oo m J w m's m 1, o �o D I _ o a w - U J°oa ��W> moa�Q- mW �a o°o=pew a �a� U) y°¢o z m m°_� � N�o w w w N� m U �¢ a - w N a w z oo� - ow o� =� o�z �� o� �I y a�> o 'oj� oW Q z x -u,aw oo c"i°�°a° a� io25516i c� oo° °° Z �<ww� �N °aao� QaQo� z _ o �oa�° - II a °a N �r�w om 3 Fam F�m�°� Fz� mre a �o��Ot° �I o a¢ o w - o w N M a m d° z w wz o r _ ° r tt w i w z a a d es o o - LL 4 z a o W z1. 0. ? °m 3 i o a d O W,Q a F O I I~J W Ou w a r Q H°O °¢_ f z m i U OF z0 N Z w¢ ¢ JO O x 4 z _ w° Q m C� O Q w _w m ¢ u U _ � xx O w m Q m¢n w 2 Q O w z> O Q W O[� z¢>¢>U r O Q x0 Q O K(�O z_O_K w F ? °o LL J p z z z a° ¢C� ¢W z O,t a z K= z Q° ¢'n a a° w Q~ w¢¢ > - w x F Q F w w -ww W, -w w =0 a w w ¢z K K F O a d p K wa m� Ux� w� Nei �wwzm > > 5m Uz N� Z. rc J o =w z o 0 0¢ w w °o° a w a 3 o w Q i a °o w o o Y o o m o w °o maw ow ¢ aoo sav, x o H mw �W aw °�° °o ao° =ja mW mwa mz� ?zom oon zw a2oo� °� az O wiz a w Foy �� aNz° oam -w -a�a°�y owa i wo - z o,wz -ems �� °z �Q og j Nmo mo z° vas,z o f cYi N z> a o w o u,o a y 2 w m m w z o w a ¢ Z 9? ° 'm'a° ° y w N w° o i~ Q ° m z m z Zr z m w o z w J o w r o N J w_ N o z¢ F a o y o z m° m W p w m - w F rn >o°vmi o°y �z �w mw_ °ate° a�x wwyo 2LL° zo �mNp .26z cai� LU w� ��, o w °o °io °o vio _Q�o u, m ua a=3 m�i °-O �o mw° �No LLa H = � y °°o wo W _w'o m ° °zo iw �ow w w roa w 1 =wam¢ i ao aw °�wo ° o xo >o °ow o ° m°w o ? O �o m¢ 5� 5z w mwa �z >? a°w �o J °J� of °° W. z rc w o z ° w m m o °w r - -w w K ° P i° Q o wa aJ°oo oz oz oIw W. >aao i o Q owm ooLL mp ° >o >z w z o w o o F z °w o° u w o w m z N ° z°r z m a � qwo� poo o rca qwU qwm Fes Fa a F oo� o w w O o yzF oa ooa ism o� U' o°�m ��a o�zop oo yob o° oz `�' d� - z ��1 °°o U w o ° w i i o w a a 1 o w z o o D o w o°w °w o o o°w °° z o w w Q o, Q a¢z rc m m. r m r a m w a w o U U m s ° _ a u a m d a 3v�'a iaeus!w'o end wReaow�a�wd so esssuv s� i v�asa rivosz� ! aw 4aa i am revzs_z somszoz`xT!d SVX31S NVId NOUVOOl ONIU02 IISIHHO sn&&0O f� Ailo o Q s —Nw NOLLViITOVH3]U OHO3VIM AVMIXVl 0 2 1d0dlIV FVNOIIVNJ31NI I1SIJHO SfId o `^ S ROFA VAOa ROFA V30a ROFA VdOa ROF RSA VSb RSA VSa RSA VSa IS 9£-8l AVMNflJ ________--__._____._— —.I. .`____._—____.________________—__---__- RSA VS? IS ry VS2 RSA VSA d02J ROFA tl30TJ Q F�V30?J ROFA V3p?J Q VAO1 TOFA VAO1 TOFA V�O1 VS1 TSA VS1 TSA VS1 TSA VS1 y V AVMIXVI V AVMIXVI Z TSA tlSl x bSl tlSl TSA VSl TOFA v�o1 v301 qFA v3o1 N I � TOFA V30U�� Q 1 O TSA VSl V301 j 'w NOidV VO 1SV3 D D N D p m O yD Z D z QQ Q O d r r Q 2 d O w r p ¢ y5y i z 3 Io`'P 3 m e r p D y D DO Z m � d`'Y SgP d / z r¢ J0 � gP AP Y 0wO z d �w _ell ONO OUry D w z ?Ktt D J D >Zw ono P za¢ a aQ� �a3 d� 5d zzz ttc�p �P �p OFP d dui a p z N r O >> KZOO Owo mUa- ran v�6 09 z ry / d 2g P 1 b /1 d`' wz z w W F w w Q ) > K tt 61 dyY /P / w < a r r 4 5P / z x a w w w d Q a o U w Z O U ¢ O of o m w0 wLU d9yFP d�0 d d5 p�P g Q OFP 01- F5P / Lj L yas!i�a11 3v Tae4a!vu'Ii 'uo ei� uoycep�W1qWd sE l9,.a..l�lC 5� l VLaLa_tt6u0sZ� I a�94a3 1 dan ttoZo_Z BOVu2oz�N:al!d jOwrz �;ud� SVX31S,.� -' M31NAA0'SNOURINOO 0NI1SIX3 m �wxoM IISIHHO sn&&0O f� Ailo o 1. `„A^�a i. _ NOLLViIIIOVH3IU OHO3 AVMIXVl 0 2 �. x¢� 1dOd2IV FVNOIIVNJ31NI I1SIJHO 50d JOO-777 `^ S tl�OTJ ROFA VJOJ ROFA VJO)J ROFA VJO? VST RSA VSd RSA VST RSA VS? p p o 9E-Bl AVMNnT ---__---------------`____-__--- -_-..- ------._----_.----_---_-`----`_-- VS`J RSA VS21 S' VSTJ RSA VS2J VAOT ROFA o? F=JO0 OFA FA Vd01 TOFA VAO1 TOFA Vd01 SA VS1 TSA VS1 H TSA VS1 TSA �VAvMIXVl VAVNJXVI VSl TSA VS1 bS� VSl TSA V301 Q //TOFA tl301 TOFA V VAOI� ¢ \ TOFA ViO � a H vsl `TSA VSl V3Oi (V NoadV Vo isV3 na U n p 0 �o aQ - Q a ❑ oN + o No a z 0 n� D �5P DO y0 O j D D dS K r a dyY �yP r LL r 0 2 Jy dY0 �o � D O y Q04 P d`'Y F� ➢ \ d�'OY Fy A d �Qe Y yP o P �a '.OFP P Sy 6 yY O P P P d �d5� 4 / bs 2e1 411 / d� d5�OY QO OY dyY / P d� ��PAy SyP OY Q-OF ?yP �yP - d`' d�0 ad 10Ma 1 asn+au11 3v T'a laewiw'ao en- a� IJJw�wd bE�sLaalvalE 9enes9�se� p�vo��y�vaosZ� I a�9 4 a 3 i dao ttvaa-a soM.Roz�-x SVX31 o NVId 01130'9 SNOI110N00 ONIISIX3 w {m xpM IISIHHo sndvoo t� Ailo NOLLViIIIOVH3IU OHO3 AVMIXVl 0 2 1dOd2IV IVNOIIVNJ31NI I1SIJHO SOd JOO-777 `^ S F t � wz4 � a Q Kiser a0 > w p w a r LLU� o�o�ay�w tt� a d o ¢ ¢ ¢¢ Z z¢UQ rw�Q�00 M., �Q w w Q w ¢ tt tw rQO - Q p a o ¢ 3 o Q rcwwxiuF�wwwo�p jow p oQ�z w d opw�o R_F oi-omZ d J ooa r 0.. z W o oUNo2wz o Q Y yob n�>°� a�w II i I 0 MMO 133HS 3NPHOiVh N Q a � ¢ 0 0 0 1 0 ➢ N O a Q o ZO a 0 w n w DD pE p D / > Y D dip a w> P Z / Q � W zOa I O o^ P w pF w� y -0 ¢ < dyY x D O ao ¢ W HK D � C�O z Iw n w dam' ti 4 D �p�P dyY �O ¢ o c0 z -\ SOY co a y o / � d Z tt v r� z / 1 Ply dyY x0 a � r w N Z O z I- a N t Z � P TSA I _� ¢ dy w a /Qo P FO O / F ZZ Iy QW� y II x0 y P / O x QcJP 6 w Y O d Y gyp. �O O xX� ss FK zzz N2 y O P pF P 1asn+au 3v T'�laew!w'ao end �I IJJINaqWd Ol£eZOZ5lN SI l Plui,J- 1 dtlJ ttOZO_Z£Otlu20Z\N:al!d SVX31S,.� Z NVId OH30 I SNOIDINOO ONIISIX3 o m �wxaM IISIHHO sn&&00 f� Ailo o NOIlV11I18VH3?JOH03AVMIXVl 2 o 0 l " 1dOd2IV�VNOIIVNJ31N1 I1SIJHO snd JOO-777 `^ S ¢ Z ^^I = O O a w O w a ~ — w w J w z Q Z d z U Z x3x U d F Z OU Q o OU vai h 0 0 K ¢ o x o x GQG _ a ¢ ¢ _ F U _ O O 2 J x w a w K ¢ 6 w w v~i w w w u o w X Y II � II o I i � I FA Vd06 ROFA —VJOL RPFA VAOJ ROFA V3O1 ROFA V3OJ R w � D D Z �O OW z OZ2 Hia` UW —¢W z X 2 2 TOFA V101_F H` w�U' ` TOFA -o=V3O1 TOFA Vd31 TOFA V3O1 m� I\/ 5 SA VS l \ /—9£ \ TSA� VSl TSA VSl TSA VSl V AtlN11XV1 D _ w \ .77 X TSA S �\\ �g L" Z- -%Sl TSA - tl511 TSA 5F II Vj01 wl TOFA-- Q U Z a (/ L£� --TOFA tl301 —ROF� 'JI D O I Y� O oz <_Z=F O -� w zO Z LL,U w D O¢ l KU05 �0 0 J z TSA ¢ D zQ o W �tt w I O I In x z z� w - a C� I w� I mow c N _ K lit O D Z w2H �o n_z �� am - o D D a \ o o N_ a O w N o a o - zo \ W x D X W O K W C'Jz OOT w uQ z w — >Q _ I Z OW X— UQ � C9 K W O (9 W a ~O w y D D D D O D � O ~ 6 MAO 133HS 3NI-IHO vn lae4!w o a �I IJJINaq�Wd Ol£OZOZ5lN SI l Pl�4i�J-[t6�OR\ I 0\94a3 1 dtlJ ttOZO_Z BOtlu20Z\N al!d S + w z SVX31 S310N lOa1N00 NOISOU3 o o m �wxo' IISIHHO sn&&OO f° Ailo o A, NOLLViIIIOVH3IU OHO3 AVMIXVl 0 2 1dOd2IV�VNOIIVNJ31NI I1SItl HO sndwo-777 `^ S � U�D O a O Q a Z w p V -Qszr Q �zUJpw O m so 1Zr J 6 �FQm�0 Q QJ 2 .. z �dou�OW OU-w � m6 00 z_ ttoz wQ�_ON= Z mo w >LLxWaW� LU tt¢ p �owz � x mwOw KLL°-z�0 WOOm�z° OpFQF�u LU p � p ° U wUOmrc _nFr— Z J wo a[�radr O CO _ w <m _ a Z. <�mw z � op O Oz w tt o - aoFwWa U ui _ r LLI Z F - ° _ - - oQ woo am W O �aLL z>o ? i of o a 0 W co Q O �?- pK a Ov�i CO — — O W ° a w a p w a w z w wwo o ww Lu F o oow Iw W ooN o QZ og p O tea= a°gym- s��� ° aW ° N �z_oo0 -zzpWjo�z� oW�woo ° o oa a a maw w wp 'ao o�o Uo _waaI o <G ttFi0000°o a w�v o wD ya a o�O z ° m 0 0 Z O d - 11W K o 0 O a a 1. o C °a a W a _ Q o as m W ¢ _ n ¢ 2 a a 2 a u, o wo J>a O W LL O wO Z £ U O O O a p tt> O d d s O O w w z yasy+zu 3tlT"J laeya!IN'uo el'J aI IJJINaq�Wd eE£BZOZII£Ib SI l PllG3J-[t6a05Z\ I 0\94a3 1 dtlJ ttOZO_Z e0tlu20Z\N:al!d \G_ SVX31 M31Aa3A0-1MUNOO NOISoa3 o om �yxoM IISIHHo sndvoo t� Ailo a NOLLV11I18VH3IU OHO3 AVMIXVl 0 2 �. x¢� 1dOd2IV FVNOIIVNJ31NI I1SItl HO SfldtlOO-777 `^ S tl�OTJ ROFA VJOJ ROFA VJO)J ROFA VJO? VST RSA VSJ RSA VST RSA VSJ p o 0 ---�- 9£-26 AVMNnJ ---__---------------`____-______.----_- - - ----._----_.----_---_-`----`_-- VS`J RSA VS21 59;.. VSTJ RSA VS2J VAOTJ ROFA O?J a F�V30TJ OFA FA V�O1 TOFA VAO1 ¢ TOFA V�01 SA VS1 TSA VS1 TSA VS1 TSA V AVANXVI V AVMIXVI tl51 2 /// TSA VS l bS� VSl TSA V301�� ¢ / �FA V�O1 a / tl301 TOFA V 5 \` r tl301 F TOFA Vi01 r rsi TSA vs1 � N W NMdVV°iSV3 na U n p 0 �0 aQ - a w ❑ a °N '¢ ° a a + o No a z 0 n� D S5P DO y0 ° - D tt � a dyY yP O FP O > nJ r r U r F yP ASP+�PJd Y / � D �`9 x O J SyP P O a j d`'Y 'E� ➢ 1\ d�'°Y Fy P d Quo Y ' yP °-a P P d5 �P Syp SO/ P S°Q FP ^�y dyY OAP P d , S'1 / b, S� dyY ".d'+y 6� �J? dy-a d5�OY QO OY dyY 6/ EP P SO 14 - d`' 1 asn+au 3v T'�laew!w'ao end �I IJJINaq�Wd eE£BZOZII£Ib SI l PllG3J-[t6�OSZ\ I 0\94a3 1 dtlJ ttOZO_Z e0tlu20Z\N:al!d SVX31S, NVId IOIJINOO NOIS0U3 IISIHHO sn&&00 f� Ailo o �s s iFNw N0I1V11�18VH3?J 0HO3 AVMIXVl N o - o 2 �• xa� -- - 1dOd2IV IVNOIIVNJ31N1 I1SIJHO snd JOO-777 `^ S 15 01 wp w0O0 FW�ZO NO wN t w O �Z Q RR w=Qaj Oww Q NQ O - d U�w Wwwttz¢rn- Qax Np P ��y a j - GG w 2. ¢ o p �=w Ow KKz 0 ww tt016 w d K w W Q OHFZtOii mvOi 0w 0m LL xzw 0 w O O O n �wOza�rw Uwz�wa O� �or z d O o w w w 4 z4 px w w a O�w OUzZOzm �r�Owwm �¢ ��Z W o Q N ow rn W �za OxwxxJ O� N�j� Q W a o > > O z� z a &z QQ ♦I1 Z Z w w O K S o O O - 6 a 6 - - WLL OZZZo OrnF KZO=WN aOOU W y y NO y w wawwOUwz O� U o0 wLU azUw ZONwU �p Urar Y a ur F �iFao�o� m �ww owo o ¢� aoa °aa� a to, wzz o w�zo x x a s o II goo x X II w � w�°�aN u,Wao�3 pmo 000N a Z0b3O 133HS 3NI�HOiVh a a � a 0 0 o I y D D y D O � D < DO a O a O a d O a 1 a > O z D O ¢ D D E ~ D O O Y D d0 a OFP / a > y o O j / 1 D / w r Op E U D ,�OFP dyY yO / / y / / u / Y O ZO d�O Y U dS I n / O r u may\ 1 d w6F� bs�d yP/ 1 yl/dopy � O G CSP p r /O9 bs d p-D / d5 / P E cP p 1asn+au 3v T'�laew!w'ao end �I IJJINaq�Wd 61Z 0Z0ZI0lN SI l P1u3J-[t6�0sZ\ I 0\94a3 1 dtlJ tt0Z0_Z B0tlu20Z\N:al!d SVX31S,.� Z NVId lOa1N00 NOISOU3 IISIHHO sn&&00 f Ailo o t Y`Q s �iNLL N �.. � NOIlV11I18VH3?J OH03 AVMIXVl 0 2 l 1dOd2IV FVNOIIVNJ31NI I1SIJHO snd JOO-777 `^ S z Q O Z ^� — w d K m U K K w W 4 O Q ~ w w O tt ¢ ¢ ¢ U o y J O Z z d h O w w w 4QQ p z W N n rW ¢ O a v¢i O oK In O� 2 OZ w W O cQ z w w O_ 2 ¢ 4 zU z w� �w Q Q w G J X X O O O - Q Q X v�~J w D p vU~i a a w tc w 0 \n Y C FA all VdO? ROFA VlOU ROFA VJGy ROFA D 6 X ¢ I.F. V101 TOFA V101 TOFA Vd01 bS 1 � TSA VS1 TSA VSl TSA tlSl TSA VS 1 }1 1 tlAVMIXVl I TSA -� SGc T -'- � r TSA Sl TSA F. S�z Vd Dl\ ".,TOFA TOF�_ ¢P I\ 0 F 1 o ° aa£ w H / SP d5 D Z r y n 9�TDA OG£ 00- n / Q OJW uU 3c �U TSA ¢ I F O w _ a o � s z - ,� LL o a n O w O � � OF za y I ¢ O ¢ O a ~ 0 D W O -0 F D D III D 6O(YJ ¢ N hOz � zU Ott � 00 aU �U Q=U N Q O�r O r�o O - D D Z D U D O D D Q V¢i O ~ 6MDO 133HS 3NI�HOiVIN lae4!W o a �I IJJINaq�Wd 6LZ OZOZIOIN SI l P1�43J-[t6�OR\ I 0\94a3 1 dtlJ ttOZO_Z BOtlu20Z\N al!d l� (D S + w z SVX31 SlIVACI lOiNOO NOISO?3 o o m �wxoF' IISIHHO sn&&0O f° Ailo o i, LL C, NOLLViIIIOVH3IU OHO3 AVMIXVl 0 2 �. x¢� 1dOd2IV�VNOIIVNJ31NI I1SIJHO Snd o-777 `^ S w J z \ O w w o o=sQ \yip w 0 o d z p o =� m U 3a o F O r � - zQ ° ///wnwlNlws Q J mm� ma wQ o w d o /� J w J F- z Pz a =a //\ cn o m o / \ z w o 0 O J o _ - o / O 6w z J ww W. f_ ro oQ LU ' W_¢ °m J 0O O 11 xQ W oko W _a _w w wo of O w w Z Q d a o owww wa m w w a LU Z J o oI o� wnININIw.s�� z F z° O ry m / 3 3az°� / O o 0 /\ z w F— v U Z/d=5`Jtl9 m0 JO 1HO13H <z \ z N f I w wzw =N W Iw= o J o a z 1 sw =awma °o w �a _ �o QW zoN �;LL �I w ,ox -oU5a _- =a"1� xa �o0oa �d1', o 9 \\\ U Y o (4 o z \\\0 W_ -- Q ° F W LU Q / _ ❑ Q z ❑ za o IIII z Ow ww o W w o w z nn°Is F m - U U? = w z o �a W a = o w w w� w� Cn Cn o w o u F w w a ¢ J U a 1 ao a h w 1.u o o 1. w N Z Luo y x w 0 ................ XVw NM masP,zu 3d �lae4=!w ens I I�JINaq�Wd HOZ OZOZIeZ2 SI l Plus-3J-[t6OSZ\ I 0\94>J3 1 dtln ttOZO_Z OOW20Z�N aI!d (D SVX31 M31MEA0 31IJO?d ONV NVId o 11 SIHHO sn&&0O f� Ailo o N0LLViITOVH3IU 0H03 AVMIXVl N o 1d0d2IV FV11011VNU1NI I1SItl HO sndtl0O `^ 7 7S tl10TJ ROFA VdOJ ROFA VJO)J ROFA VJO? VST RSA VSd RSA VST RSA VS? p p o 9E-Bl AVMNnT ---__---------------`____-__--- -_-..- ------._----_.----_---_-`----`_-- VS`J RSA Vs2 S VSTJ RSA VSU V10TJ ROFA Vd0?J F= OFA FA Vd01 T V101 TOFA Vd01 SA VS1 TSASA VS1 TSA V51 TSA �VAVMIXVI O VAVANXVI tlSl /\/ TSA VSl bS� TSA Vd01 ¢ \�ATOFA V101V 0i� F V�tl3 1 I U IL OFA V ia I NMdV V91SV3 D D D p 0 �O ¢Q ❑ a o F¢ N a o p No ¢ z � U 0 n� w no 3 o d z n n> d r 2 9 d�0 r0 O ra OFP�PJ /Y I � T P Sq a y Q P DS F / Y dyY S`PF` yy/y �� d�0 P 1eQ-o JJ P '.OFP P Sy 'O FP 6 /'dyY OAP P 4-01 2g ^^ d b / d5�OY QO OY dyY / P d� ��P�y SyP OY Q-OF ?yP �yP dE' ti AO�y Y Oa dam' 6� /j Ac'PY Q-OQP Q-y / QyP / d�0 / O� ad 1�Ma 1asn+au 3v T'a iaewiw'ao end v aao�wd Loz sLaallElE9enes9�se� palldo-tt6ao ttoao-a soM.Roz�-x SVX31S, 311JC)dd ONV NVId IISIHHO sn&&00 f� Ailo o Q s -N NOIlV11I18VH3?J OH03 AVMIXVl N o - o 1dOd211V 1VNOI1VNJ31N1 I1SIJHO snd JOO-777 `^ S Q j d Q U w O tt QQ> = Z. U O W w ¢ d tt p ? _ y Lf,J Q w O O a w w O o cQc —�- Z °a 21 > > z U' u\ vQj. G° °a urri �w x a w a w a a $>LLI ,_ > pQQ X, X, Q y LL Sa Kw x X10 IW LH I I I I � s MO d`J 133HS 3NI-IHO-LVN oro� o I I I o 5i o I blob I I aoov I I I I at 313 sLoro D I I 0 O+901 VAd So at I I I stub I o0 of of a o n; L'Ob'313 LV'ab OC 00+SO Ind d I y A > I I a 4 ov 313 +I SOY 0 00+ba Ind Loot F d o V0O n 1 D ntt(`�P ¢� 00'6b ��LL at 313 LZ'04 ¢p 0 00+£0 Ind .0 99'6E I IV, D dyY � a f// a esot m o � �✓ �� o� a LL eese 313 p 9Z'Ob LL i6+L0L LAd w O 66'6E ~p I �� U a I � 9Z Ob'/\3 3 ZL of 00'0+LOI d L0'at n O tat' 13 A�2 Y 5Z'Z+LOL W '�1 d £9 o+LOL nd t5'Ot eF ° < I9 oV7�o / FP b6'at dyv �gP LL'at Y °FP d� / SOY Y d �y OFP P oFP yP '� yasy�a11 3v T'd laeya!IN'uo eIJ al IJJINaqWd 02Z OZOZIOIN SI l 1ly4dJ-[t6a05Z\ I 0\94a3 1 dtlJ ttOZO_Z BOtlu20Z\N:al!d SVX31S,.� Z 311d0ad ONV NVId IISIHHO sn&a00 f� Ail, Do t o NOIlV11T8VH3?d OH03 AVMIXVl N o o �• xa� 1SOdlIV 1VNOI1VNJ31N1 I1SIJHO Snd JOO `^ 7 7S a z � C � a wZW 0 tt as> Q Q ~ W = O j Z 0 ZO a 2 a LLB Q w U d W R Q U' > > U' 10 10 LLJ J X K X Q r X a w iilll �� G x x o " CUJO 133HS 3NI-IHOiVN 9 2 s 4 2 F 96'6E� o V , I I I LLO 96'6£ to DD o � y L66£'3�3 LG'GE I 0'00+S1 Iwd 8G'GE I I o I I n I 866E 00 ov I I N a 0fi6E'3l3 6fi 6E OLL '00+b6 Ind ZD'Dro > o I aw � ODDro I d a 4 �DDt I I I I o D ID gOro'3l3 LO'Oro 0 O m I I O'00+EL IAd z 00'ob > IIX. aED'Dro x I Q 96'6E Q I F I I O'Ob'i 313 EDDro I D 0'00+Z1 IAd 96'6E I f I I I boob o I I oo'ob I I o'ob'313 90'Dro 0(ooµw Ind £D'Dro I oo'ob > 000ro I I 0'ob'313 LDoro 0 0'00+0L I Ind Z6'K o sD Dro 4 D at y 01 313 sDDa 2 y OC 00+60 IAd ro0'Db 0 I I I a or o' b0'Db I I O !1 I N n I y I lL'Ob'I 3l3 LL Db 0'00+20 IAd ED Dro I I I I EDDb n z0'Dro 0 I I ~ I I E�oro 6Udo 133HS 3NI�HOiVIM zD'Da Ma 3e�0lae4o�w�o 4—� �� IJJw p��wd oaz aLaZrelm-�9w� p���dJ-tt6�OSZ� I a�94a3 i dao ttoao-a eoM.Roz�-x SVX31S, E 311dOad ONV NVId IISIHHO sn&&00 f� Ailo o '•2i$ s i F N w _ NOIlV11I18VH3?J OHO3 AVMIXVl N o - o 1dOd2IV 1VNOI1VNJ31N1 I1SIJHO SOd JOO `^ 7 7S 16 Z a ¢ z � Z � _ w U Q w U p uai O a w o a Q > > > U G - W o Z. 3 3 3 N o o J x w d w a Q w d LU Iw IIIII GEL x I I I o " ROFA tldOiJ ROFA tl3O21 ROFA I p V3O1 TOFA VdO1 TOFA N 9 VS1 TSA VSl TSA V V AVMIXVl 4L'04 L'9L+LZ IAd a OL 6E o 9b6E ry N ll =� \ / -- - 0 09'6E'313 Z'6E'A 13 N N ^ Vl - o o< S 9L+0 L Ol 00'L+OZL d TTSAS` ' - _ � ' �N m Z9'6E LL'66 _ 10a aQ <vl -.iUFA p¢ ¢z w 69'6E D a I EL'6C 3l3 i 00 SL+6LL OAd x ¢� V m I a 8L'6E ii N� p y LS'GE O I wp a� 4 6ti 6£'3�3 69'6£ 01 00+6L IAd 4L K I ¢ O O I e 06'60 Z9'6E � i I > L66E'313 L6'6E I ¢ 0 01 00+9L IAd Z9'6E o I I � i I o O _ Efi 6E'3l3 mu o 0'OO+LL IAd L6'6E D \p I y } I ry b6'6E 0 066E O D D ¢ 6'6E FUdO 133HS 3NIIHOIVN 9661 Pl�4d e �lae4olW�o —� �I IJJINaq�Wd 02Z OZOZIOIN SI l ............ J-[t6�O I 0\94a3 1 dtlJ ttOZO_Z BOtlu20Z�N aI!d SVX31 b 311d OEd ONV NVId o o m �wxoF' I1SIBIH0 sn&&00 f� Ailo o NOIlV11I18VH3?J OHO3 AVMIXVl 0 2 1dOddIV 1VNOI1VNd31NI I1SIJHO SOd JOO `^ 7 7S 16 Z Q G z � Z � _ LLJ O O > > > U G - W o Z. 3 3 3 N o o J x w d w a Q w d LU ELIw I x I l 1 o " 110J ROFA VJO? ROFA VdOi V3O1 TOFA V1O1 TOFA V3O1 TSA V51 TSA VS1 TSA V AVMIXVI 06 BE 313 0 S 90+90 IAd BE BE o+ B 6Eo Za'6E o 6 m m� se —�� I o� TSA --__. T�A dsl � — �� � BE LL e o m ZE'6E N° 10 I VJO1 IOFA vv.IL c rPA+ 69'BE U O'Sfi+b ElAd Z9'BE n 06 gNlll IIH N _ O ZYK LL'9c'1313 zvac O E+ 0'S 60 IAd ro / W W U o LZ'BE 0 0 LO'96 OE 01 LE BE M CO w y -'_-� 21 A313 w ?z F z 6'bL+E E OAd Z —_---- -.w o z w - w¢OwO- roc'BE J _ --- � a � ros ae U l zLL 4 bti9 '1\313 9VV9E c a G z 96'SE a cO 11 °UO<U Ny 96 BE 96 SE oz 0.a 7b'6E'313 666E m zbse M EE'BE I N EE'BE 1 V Qo bZ'6E A313 I VZ 6E 0'01+L EIAd I bZ 6E M a o o vt y0 yLL O o yasy+ay 3tlT"J laeya!IN'u al I�JINaq�Wd 02Z OZOZIOIN SI l Ply4dJ-[t6a05Z\ I 0\94a3 1 dtln ttOZO_Z BOtlu20Z�N:aI!L 0 owoz �;ud� SVX31S,.� NVId`ONIOV?E) IISIHHO sn&&0O f� Ailo o CON .. -� NOI1V11I18VH3IU OHO3 AVMIXVl o - o �• xax IdOd2IV FVNOIIVNJ31N1 I1SIJHO snd o-777 `^ S Z z Z O OF ^� Wz a Q 4w a � z ° W LLN z Z ° W W° ° ° as °W o o o z w¢o < oo Jo opaw W N Y III xx x l l ow °FFo °�o-W°ao�m zwo z ° o—zoHZxLIII 11 .ROFAy V3021 D R FA VJOT ROFA V3OT ROFA V302f ROFA V30H D Q J 5 OWF F TOFA V301 G a -TOFA V101 TOFA V3o1 TOFA V3O1 b wzo SP \ S \ c _ TSA -� VS1 U2' > TSA V51 TSA tlSl TSA tl51 OUQ+ o - ---'6 —-. tl AVM Xtll VS / VSi z tt TSA VSlI ` TSA VSl M TSA 06E or wOw� 1 ci'f �U>LLFw LL V1O1 TOFA a 0 J I I TOFA �Ol tldCl TOFA - O F OKrOrN��2 N M W � ~ ¢LLJ �LLJ I a I zN o FF�X�2 M y r0 v2 A TO m F -OlE O �y Xu�iry j m0 °UO�°KwW D TSA ¢ D LL� wo F�� 2Ow 01 II n�~Ow �oz2dw zw� 0 oz° o O° oow ' V D �o I a I D O W 0 z Q 2FLL I �o z _m of O N� it < viOw z . w D � y � w I a l s°a I D m LLo oe�w LL�wJ I I I F .0 o0 LL ° I I o I I I I ; I o I I � I I I o 0 I 0 aeuwo a,,eadw° "I Iw l� 51 , SVX31S.� NVId NOI1V2101S3? IISIHHO sn&&00 f� Ailo o NOIlV11I18VH3?J OH03 AVMIXVl N o - o o � -- - IdOd2IV FVN0IIVNJ31N1 I1SIJHD snd o-777 `^ S D D — O U°w a w a a ¢ ¢ a�a Q ¢o ra¢r U p ¢ K (0 U' — K OU�Or/�U z wQOOO' aZU CO w d w z - 0 O z Z ° ° ° ° ° z w w 0 w w 0 w w w w ow¢1.° o zi0¢ozz z� a� 0 0 ? o 0 0 o a oz wz o W o o o 0 0 0 w��az w m° �zzi m° °_ ���¢s��m� 30 o W a o���� �o Y ooz��w oN Jz��z�a ¢ oz II II Jwd°° J _z�_wo °z ow I II II w N>oo wwozi a DW w dodo w 111 00 0o e a- o ROFA 10J R FA ViOT ROFA VIOT ROFA VIIN ROFA V30H D Q D J 5 TOFA 1301 TOFA V101 TOFA 101 TOFA V301 b - TSA - VSl TSA VSl TSA VSl TSA VSl V/.VMIXVI TSA VS1 TS / VS1 TSA VSlm TSA VS1 TSA V1D1 TOFA i TOFA Vd01 - Vd01 TOFA U a n TOFA D TSA a D ° I I r I I � I Q I ¢ o o I I D I I D I ° I � I a D D I I I ¢ I ¢ I I o I I m & D I QI D x o o D D I I I I ¢ I I 0 I o I I O I I n D I o I D I I w n O yasy+ay 3tlT"J laeya!sy'uo- uo�/.ep�yq�q�Wd0059O..lE/C SI l WLOL.9Z-[L6u05Z1 I 0\94EJ3 1 d11'J tGOZO_Z BOMSZOZ�N:aI!d SVX31 SN011035 WOIdAl o o m �wxo' IISIHHO sn&&00 f° Ailo o ofN0I1V11�18VH3?J 0HO3 AVMIXVl � o < 2 -- 1d0dlIV�M0I1VNUINI I1SItl HO SOdwo-777 `^ S NOIlOPUSNOO UO0 3l1SSI 9ZOZIE IIL l 9 a FQ O ¢Or ttmwU OOOQ 3" poi owsa Uzi z _ w as a -Oz a Fm� waQ w3 H h W -w U) o o - a FJz aaN� oorc� Q o w m�a aw-Q`d www� I➢ U wo Boa � 'oN w� Qaow d oa ° °� wa° ➢ wo ro zow s o�>o_z � .➢ Q ya � Qo Sao °rp�°o wQar�w a Fob oQo zmmm 'll cf) °� °-o m° Roza W wJ U �o .�o aoop Fwo - U "o k 'ate w o�� y o w. w �owo Fw'awu ...-: Q w od, LL o>Fg LL°z _�o �o�o _o�"w a o N Q x� ao_ u, Q_ ao,oW F Q y Q U U Fz _ W w U) - ° Q W z w J O =I I I ❑ o= o U) _ °� N a W J = N \IIIII W ow ` I 0- °w °�W. a Q w w Qw ow - F �w d� LL w N z aw �� w° I w� p o 2 z w Q N �� Oz y rcm F DITCH W o ❑ �o �w wo ttw �o 0 oa Q - _ o Z - o< aw _ _ U — o< J 0 0� 3 "o Qo z d �o o — (n z — o� o 0 cn Z U U w Z ~O _ _ �F � —wz } W O/ _ O Q 2Q >O K �UUi In Z Q W Q III III III U p U I ¢ e a � U oZ U w a a z� W o - Q z U° — UU W - - - ow I - = o o0 _ ❑ a� o I o w f I z = w a� �1 = O p zgo V1IIIIII ❑ U a o ❑ w- w� W U DITCH E - LU O III z QpJ OF H� I J _ °? Q w oQ CO w Paz o° O 02N _ (n QO Q= Utt O� X w o0 — �^ w wQ w< w O 0 Q¢ SU r U Oa O� U r°ii Za� ImII V Ur a w QOO = oN O Q tnw QF w.� 0 4�'zOZ JQ GG _ m U a rvU .1 = OK ON Qw Y w Q O w 00 IO Oa QQ z w = > Q F w a O � — z X 3tl Pass gel T"J laeya!Cy'uo el'J a IdJW dC�WV 6l 0l 9..0ZIE l/G 51 l VL0CdJGG9ZDSZ� I CI\V 4513 1 diYJ G[9Z0SZ90V�Z0Z\Z al!d ` \� wwm } \\^ ��^ /` d m :__DHO,_iI�Od \\ \ \ a_m_.rsz Iz {(§ } j / 0 / Po z < . \ (\ } \ / $ a _/\ . �Lu � // G ( \ / \ � m / / § us - } e �LLI � ~ ' ` \ �_ /_\ / \ / \\ - co LU /\ /\ / }( » »� ) ` � \ ( / § / z ! § \ I e ar § B. /\ § , «. \ / / \ � ) - /\ } a ^! t 11 w ` \\ / 69 I q ƒ( � , §}\ {\§ ;_; i / � § t ^ }§\ : \ Z. j \\\ \ o Owrz �;ud� SVX31S, M31AU3A0'NVId NOUVA= IISIHHO sn&&0O f� Ailo o NOI1V11I18VH3IU OHO3 AVMIXVl 2 IUOdUIV FVNOIIVNU31NI I1SIJHO sndUOO-777 `^ S tl�OU ROFA V30U ROFA VdOU ROFA VdOU VSU RSA VSU RSA VSU RSA VS? p p o 9E-Bl AVMNnT ____________________`____- ---__.-____- ______- _ VSU RSA VSU S'$ VSU RSA VSU VAOT ROFA 0U a F=30U ZOFA FA Vd01 TOFA VAO1 G TOFA Vd01 SA VS1 TSA VS1 TSA VS1 TSA �VAvMIXVl VAVNJXVI VSl TSA VS1 VSl TSA V301 Q //TOFA tl301 TOFA V V3�� ¢ \ TOFA ViO�� a H vsl `TSA VSl V3Oi CV O_ J NoadV V9isV3 na U n p 0 �o aQ - Q a ❑ oN o Fa a + � o No a z 0 n� D �5P DO y0 O j D D dS K � OFP y r LL ~ � A J0 dYO � D O y�.� QO4 5P F dGy E 5Y ➢ \ d�'OY F �Pi d S�QQ y 6P O P P d5 �P 5p O/ P OQ FP �6 d5Y OAP P a'Y d5�OY QO OY d5Y / P d� ��PAO S5P OY Q-OF ?yP �yP ds' - d`' d�0 :pass+au 3v T'a iaew!w'ao end eoycap�w�q�wd sz vs..azrr,es s� 9 Woa vFa-rivoosz� ! aw qa3 i dm rzvzo_z somszoz\xaod SVX31 6 Nbld NOI1VA313 o o m �wxoF' IISIHHO sn&&00 f� Ailo o C Sv4 a �i� LL NOIlV11I18VH3?J OH03 AVMIXVl 0 2 1dOd2IV�VNOIIVNJ31NI I1SIJHO snd JOO-777 `^ S U — Z Z O� JO W° a d > ¢ ¢ ¢ w Op Q¢WFO d W w K OWo WWUQZw>�WGry Q F xx xx Z d Q w U WZWZ 6=-Q2 O OF w_"d U'oiO O_Z w z z 00 Q Q Q yz �2oZ °UOQ�� Q - Ja 3 3 J� aw WQ �o�awWE LLI LI.1 X W F Q w O F U ¢ OwFZo K� K n II a a �a >01 � _ -w=- 0� w� oH, aw=� Lil l w " w=a� _- 10 60I10 133HS 3NIIHOIVVY IM o IM I 1S I� N r ° 0 < o D / I I� p Y D d�0 ¢ P N Im O w Imo° n o ayY 7 D O ¢ D I m pY D N II 1-� ° e d 16 U y /4 d�0 yP 1 o a5 <P FP F- o TSA p / P I d III\ OY bS� d O / \ FP �O Q TO 9 bs / as'p-D p pFP :pass+au 3v T'a iaew!w'ao end eoycap�w�q�wd ve�s..azraus s� � W�a�za-rivoosz� ! awga3 i dm rzozo_z somszoz\xaod o ry �nlar� It,cl_ SVX31 Z N VId NOUVA313 o o m �wxo' IISIHHO sn&&00 f� Ailo o Q s ��NLL NOIlV11I18VH3?J OH03 AVMIXVl � 1dOd2IV 1VNOI1VNJ31N1 I1SIJHO snd JOO-777 `^ S — � z � w Z p wwZw w Q d w a w row-w �2UUUz ww¢OKU w K > d >iw�w 4Zw'wQ Q U Q d W U OQ�QOQ x3_pX�Qa Z U W U Q o y y 0 z��wY¢ U�oOz Q w10 > > > w .�030° W �_ z 3 3 0 � a -w��pw o�wzc� LU U Orz�r�0 UOU QO I I 0 _�_= m Q O JUwOJ — _HO i w h 2�KK2 Zz��=� G ulpddu� 6C'1d�U O FA Vd06 ROFA V3O2 R FA VAOJ ROFA V3O2 ROFA VJO1 R D D 2 TOFA V10L / H TOFA 1301 TOFA V101 TOFA 1301 b 5P S SA VS1 TSA — tlSl TSA VS1 TSA VS1 V AVN IXVI 110 TSA VSl TSA m ^\ /m m MSl TSA VS11 TSA myP Vj01 TOFA TOFA tl301 -I VA 0 I a I � MI Im I I 11 1 a I rTOFA ~o el l� TSA o `✓I I m I O o r I I n o � J Im I r o Im o K �I yIm r ¢ > ✓T 1� z D � � D 10 F O � � O � j > Im O D m I `aO O ml D ¢ L� u¢i a I I W 10133HS 3NI-1HOiVVI SVX31S, M31AU3A0 SNVId`ONNdVA 1N3NI3AVd w o m �wxoM 11 SIHHo sn&aoo f� Ail,? 0 e Q s =zNLL Ln .. .a NOLLV11I18VH3IU OHO3 AVMIXVI 1dOd2IV FVNOIIVNJ31NI I1SIJHO snd o `^ 7 7S tl10TJ ROFA V30J ROFA VJO)J ROFA VJO? VST RSA VSd RSA VST RSA VS? p p o 9E-BL AVMNnT ---__---------------`____-__--- -_-. —------._----_.----_---_-`----`_-- VS`J RSA VS21 S'$ VSTJ RSA VS2J VAOT ROFA o? a F=JO0 OFA FA V�O1 TOFA V101 ¢ TOFA V�01 SA VS1 TSA VS1 TSA V51 TSA �VAVMIXVI VAVNJXVI VSI TSA VSl bS� VSl TSA V301 Q //TOFA V101 / tl301 TOFA V tl3�� ¢ HSl V51 N � o -O O zz Z' Noadv V0 isV3 U U a w a o a ny a 0' o 0 ww z� w �J do LL J ��w �a o yam o it h Z aQQU ❑ 0< I ;OK QW i Q�Q ZO F ¢ a G p NO zsw 4 N O~ p NK z pmr O w Z�a a �o -z w o ° o¢� wo ma ono o _ � ao3 ww� JJ mom ki yD ny doy _ a mUQ who 03 � w w�� m " QUO u°z- pFP Y o Wwz U I r0 O A 1aPJ9 dYU - UU a� 00010 awz0 N� a ¢m Qw�UK sK ¢zr�nJ V V O 0 - IT SOFP dy-D 2 / � D q Q Q yP y ➢ \ Oy P�'P -� Y w d�oy - b ❑ o o P s�eo Pee- o de Z < P W w CDz a / 0 ~ a - �5P / J x o FP �6 d5Y OAP P ur 5y Y OF - P OY d� ��PAO S5P OY Q-OF ?yP �yP - d`' �P Y j� d�0 �asn eau 3v T'a iaew!w'ao end uoNerbw�q�wd ss e ozozi¢z �� i W�azwz-rivoosz� ! aw 4a3 i dm rzozo_z eomszoz\x and SVX31 L Wd IVAOVIM ONIY VN 1N3113AVd o S w o m NxoM IISIHHo sndvoo t� Ailo C Sv4 a Gi� LL NOIlV11I18VH3?J OH03 AVMIXVl 0 2 1dOdlIV�VNOIIVNJ31NI I1SIJHO SOd JOO-777 `^ S w w Y Y LL> z Z z Z y O y O a d a Q W z z Q Q ¢ ¢ m K K W M W x l I I I w X w o X y Q 5 N K �O x w� w0 x l I I I wN� � �o -G 0 MMO 133HS 3NI�HOIVW a a F ¢ 0 0 a y D y D O y D G a � OF ¢ G ¢ tt O ¢ 2 � O D Q O K D D D O ~ O n D d Oy a O N OFP / a / d5Y K D O / H D O D Y d�'O A0P o rD G 0 Y a d�0 �0P d OFP XXXXXy O O� + d /TSA P Py T / da'Oy / \ P pFP yas!i�z)1 3v T'd iae4a!vu'uo-o uoyce�ry�q�y9d ZlsezoZSl� a9 l VIa IWZ-tt6u0sZ� I a�94a3 1 dan ttoZe_Z eevu28z�xal!d SVX31 Z Wd 1VA011M ONIY VPI 1N3113AVd o S w o m NxoM IISIHHo sndvoo t� Ailo C Sv4 a �i� LL NOIlV11I18VH3?J OH03 AVMIXVl 0 2 1dOd2IV FVNOIIVNJ31NI I1SIJHO snd JOO `^ 7 7S w w Y Y Z ¢ ¢ ¢ Z Z > W W Z > O W O z Q Q ¢ ¢ m K K G W Z- - Z 3 3 o p o o r o M J �` W Q X . w0 U 0 F U' X x o ¢ ¢ s>p O w NQ X NK O ROFA VdQ? ROFA VJOU R FA VJOi ROFA V302I ROFA VJOT D 7 TOFA V101 / TOFA V101 TOFA it TOFA V301 ASP bs1 TSA VSl TSA VSl TSA o VSl TSA VSl V AVNVXVI \X XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXJjxXXXXXXXXXXXXXXXXYXQ3(XXXXXXXXXXXXXXXXXXXX TSA VSl TSA VSl TSA VSl 9 V301 TOFA ¢� F TOFA tl301 TOFA J D r n X¢ O D rTOFA p O j D TSA ¢ > O r O O H � r O ~ D z D Qm O O n D n O O F ¢ p O � D n K ¢ ¢ D 2 O O r n n D O F ¢ ¢ O 0 O > D > 0 n O D N O MMO 133HS 3NIIHOiVn aeu w o a �o��w°�wdz�ssznz5�� ,� , ��n�w��e�osz� � a�4va3 �day�ozo_znn�o�Xa�� SVX31 L Nbld CNINUM 1N3lN3AVd o S w o m wxom IISIHHo sndvoo t� Ailo 0 C Sv4 a °i� LL NOIlV11I18VH3?J OH03 AVMIXVl 0 2 1dOdlIV�VNOIIVNJ31NI I1SIJHO snd JOO `^ 7 7S K w w Y D O 30 41 U rU O y O a w wOz Q ro H ° w ° r Qd �W W O z O a t7UNO 133HS 3NI�HOIVW a a� 5 z aw ° z cQc O G ¢ O W n - Z O a _ LLI � N O U m Z - ° S W a s U Z. ¢ z o J a a Q w ¢ z w n n a s X w Q U F Q z ry m a O D Xt O � ¢ Q OF �W tt O w �p w o Y� > D O H / D ° D Y d�'O A5P O F ui h LL D tt h �OFP yY AP / / U2w 5P Q d�OY 'o- �O d � a /I D n dyY z d TSA / I cwizf DV Ibs O^ o d�OY d °FP w 4 u {�P p Py 45, d O d1 °j p OFP yasy�xy 3v T'd iaeya!vu'uo ei� uoyce�ry�q�yyd Zlsezox5l� a� l VlalWd-tt6uesZ� I a�94a3 1 dan ttoZe_Z eevu2oz�xal!d SVX31 Z N71d ONI UVA 1N3113AVd o S w o m NxoM IISIHHo sndvoo t� Ailo C Sv4 a °i� LL NOIlV11I18VH3?J OH03 AVMIXVl 0 2 1dOd2IV FVNOIIVNJ31NI I1SIJHO snd JOO `^ 7 7S — ¢ - D O g0 z ¢ w ¢ 2 JO y ww¢ w U D o y O y O LU LU J X d K K F ¢ o o mS' LU U Y Qd �WW N z O l l l w �= N �o � � ROFA VdQ? ROFA VJOU R FA VJOi ROFA V3021 ROFA VJOT D X 2 z T[_ra VAOl TOFA ry w VdC N TOFA V301 S'Om TOFA VJOl wr wm� b Ne Asp S� x o ry TSA-° mo VSl 0 1 TSA VSl Q —TSA VSl V AVMIXV1 TSA VS1 TSAu � d\ � tl51 TSA VS11 I Ts % hP I I tl301 TOFA a o/ TOFA tl301 X w� of I tt wz a I O Z z ml U I Owo wI O Y TOFA p p tt TSA � ¢ D O I a J Z I a F Q � N I�U O O U ¢ I o I I am I 0 o I D D I 0 J a z0 D D V K x U Z a > W z U� Z W O > Z O cc D D a zQ p z' LLO Uz F - 0 F d OQ ¢ ¢ O a p W O 0 O w (n z W D U w �w O 2 0 ¢ D W >Q >° D a y O~ O y O D � N O £OMO 133HS 3NI-1HOlt/W aeu w o a �o��w°�wdz�ssznz5�� ,� , ��n�w��e�osz� � a�4va3 �day�ozo_znn�o�Na�� d� co 0 w v O F$Z sVX31 ON3931 CNV S310N WOIU0313 o �Nxo' IISIHH� sndaoo Aili o J, C! NOUV11I19VH3M OHO3AVNtlXV1 m :L a -- 1dOdaIV 1VNOI1VNJ31NI I1SITHO Sld J00 `^ NOI-1-30 3-1 nss o r> F jr Fox a Qom oo❑FOW a� oo ao o m zaorr w�a z aF ui❑t�a� wa �w oww > - uz z¢r �oFz°z Fin oa i� wo 'o o az�� 0 tt❑zr w �� �ao�o � pma zVr, woo �w � o � �ozw zuprQm¢o°u >aw°\oawairw��¢w FaFm w �oau_�zs-�so�mw-�Uo aw�apwOo arwFgUrUrmQ� tzw�w_wo,idw�Fawm�i wowf °p wsQiogw Wr°wz a�,rwoo°oLFzJFoiw=�o° a-wzzOw�o °ZFi z�� z ra ao - zto y0 aod== p z a w � - a �a¢z - io y 8 z zz= o - w3 - ao 0° o o z—S, x Z ° o0 d ° ¢roN a °5°wo a Q>zzLL � ozo z tt¢ r- 6 QZ ao o zo z z 0aO z 06 oo iw °z Uzz = oN � zz a � o s Foowz o 1 w� o ' Q w Zm °z omwZw a z '>�oo� =z a - w a o3Ow°0UNNIr°w =oW wmw w °aawozu 'w` ¢�000 °mooF� - w 3 -w3� a UoizF �o > wo°N�wz mow it zw m - wwz�c r- a go ozmF�Fp cai�owz�rai �vJi aaw �g . www ww� oz . o MU -ate`-' u, Q aaozwo$ ���a�yw �uw,azww �3m 3o=F o3 �°z � > a5wo a-ow pwk11° oz ao 000w?w� -zzao�� �wa�i m -z$ w _ m a F w w-wo _Op a ?g vim - z >F r w� x_o mp� z a zo oLLooFcai� axwD F�=�Jz wo 05 oosa o 'oz w p W p W w J LLp� 00=oUUO m Oz2a wr0— �0� a¢w cwi0 cai �° J awg Fro o� J z row°p �o z°zo- �x 2 a -o oww 90 ww rFa rc�a;p is i .Fwo w wza� did m ar w m w Fmzy� w u,F���mLL ¢�arwd z°' zoz w w az F 0 p--w Jaow¢ rc� rc rcw¢ oz� ¢iz ¢- a m p_w Qoz ¢>ww ¢Nrw o °'�❑a of>wF 3Nwzx ow o oww oo°wwO o 1wzz Zwzz > ¢a a- z >� w..g. �� < pwo zvai,za=w cri amr<xNvai Jx�oa? era¢ pw � aw wz�¢ o am zpdw> �LL �zQ ��x�uoz ��o���'z r dw z �Uw azpw �� �a aw=w o zaw�tt o -mw� a ooaFpr >=m9 w�� pw r z 3r owz° -z Jo 00 0 o?z wg��wz �ww1 w� z� azg wow °wig ��zo o0 0 o zw°w J-¢ I>> o °a wxrwz r �o�o�w - wo wc�w ww �7 �¢om x oz� 1Fwoo 003 mwoctaz Ja z r r as Fa r r�w rwrv>� o r° ��¢ �No¢wF a>am F� FawF W. o J 0 x W WO UO 0 ww Z. m> OW m z0w> mp t: Q W K, ��w OO w FO — QrsO ww o m>0 NKz 01 Ow O w=wO WW p 'OOz�Qw 2 0 o_—QW 92 = z U —Q WZ wizO oap or w < QKFU - OU OUO w OQ d O OHS 0 O _ w OQa�� > zOl>rn—w U�wWF� Qw w Zm0r0 nmx v uZ zm=LL�K°w wso QrO Q W 0 zz KT o QO0 �U W. — r U >U0 O ¢m oOOOrwFoO O>ow FUO ww Q< OOd iOw wFO ZO -a0i K w a 0 w0/j rQ O w mm tap z r a o /j�Q~OU mwUOQ=u>i twit — O° °omwxz�'Jw3pi3Wxwrn w�_wroo¢�>UWi w¢ZQQ�Fi� _ra,�°rD,wz-wwoU�oomymz zFzaow�w,.=r -wW LLowa wca�i 0F0WxooFr-O�opsxraFo mQ OJooO�r a� oz�O wi o Jou r3 r o z2 o>o¢ FIwWa rKo�zv;zppz°� 01mamF"— a0 oi zm 0 o ow a w wx ~jzz� � ° z� z Qaw wx _ ° o zo1z p z Z. 1-1 zQ a ywo dm m >° oLLxWW aw>owraw " o w z'°Z UW w o ooLLa °o ozJ� ao LL��z �H¢azrJ�K?wFW�OcwaW¢-�a❑aw0a�Szzw�?wwrap—FOU��rar�°�rzOS�acwzOW�i �-z°ttQw oLLocj_¢Yi�aoN-a_>a zay�irzO—az�wir�xxr�pw w�wFzDvwi FLLUW o�`°, oO ¢Fc9 tw: pJW�CwO0 H wrrm X—zcwO.,aurOi p—waaK _—'rF< �JoKH¢'—z�Owr°a>0� UFr°�ri, �¢wa�m oOOr Wxa,FWO O ozw oz¢>w.0 wo00 aa zW 2 0zOpUwm wrwOr ozFw, zpOSpcOi z°wmiwwU�0O-w2wLLx�uzwvazK> m�zdW�wZ FwiQOpwa¢VOi o— ao°wKwN�w2�z o ° w z aaaQ' =m o wo woa �a .". aLL oWa Z. az c <Ww O 0O zo O4. xr o s O0 Q wQY w i — —? O O > ¢ pzz QO �z UUUJ w 7- O71" Z: ¢z > A. iz i pW > F O w000 1 1 1 21 Kw O 2d O 0z wa Oza rWw W zO O FZ ¢ =0 w �0—O 0z U Q zOO a �zwx�Wa¢xx0�?i TZ U � N W � N m < ❑ � t� m > �n �o n m m W� �Q �W O Ua Q 0 0> d w w r W W W O O0 g z w, Z O Z. zm O z� a w o ¢ a ° z m w r ❑ w O ¢¢ W F F U ;za a Q W U w W W w > z (9 m 0 tt o o� 3 » w r w x U d aw - tt w O w x U U 2 w w d O Ovxiz ? O z ❑ Iw0 w 1 W r x ¢ g w woK 1F °U Q Q O O ¢ a a a o 3 x O I (LL a a N p NZ. X �o Q °a00w N I C ptliuone�uawnaoa 3Veu - p tl_]%HIV Oem/%fold Wd 9eZ4 9a0ZIL4/b P H21 q�Wd�Z99ZOZ/4D S] l VLOON3[G9Z95Z1.. LLDZOSZ 90 lsZOZIV aI!d \e« NVId m=m = 7 ; d ® a � , mam _ ar ��__�,�� \ \ \ \ \ \ \\ IL « LU $ \ }\\ \/ \3 j /:� \: /�: 00 iwvL ----- -->w ƒ— � & , m ,: a w w » V _ fOFA VJGi w - 3\/ / (!° /[! �\ ;1 � :1 � � � [ ° � . � � f / , . . \e« Wd � moo \ , y : a H� mam , ar x , ~ \+\) }} - - „ mm,__�,�� NOISI— \ \ \ \ \ \ \\ IL « LU $ \ }\\ \/ \Z j )/ j j ------------- --------��. ... x ° z m w w w » w \-K: :`® .�z X0 w \j �! w V_ Z. )\( !( - _! - z - - - ;1 � :1 - IN I K / d� co 0 w y O F$Z sVX31 I S1IV1301VOI?LO313 o o }p@: Jia FNXo' I1sIZIHO sndaoo Ailo o ¢�ra� of l NOUV11I19VH3M OH03 AVNtlXV1 0 2 j � o � IdOdaIV 1VNOI1VNJ31NI IISITHO Sld J00 `^ NOI-1-30 3-1 nss 2 � o a o wmX 0 F j 30w OQ O'Q � w0 _� -z zpw o �� -wa o a aw oQLU wm �w Paz z2 w° wo�' ¢z zJ w a zo Qmzoo } o °o�' zwwra Sao r s z or H mFz T,om.zw ow _o zo o x Z. zoO N3a z uw yw U �ovr,�p moo° o� 3Q oN3YNa� Z ?<oJma o pww 5 m z _Q�xLL�oN,-ow Uw� �F � ww OF z m°o Lu -00o o > U¢wz �� J m wQ a aMx ww Qo 0 zuw Z o .ozzom w ioz wQ� _ �� z CO worzLL ° �mm iz °z _ �a�� r $ w a mow w� x� uzw w Qw � izw °�wo O N ¢ z y� o owzaZow°'rOr Q xFz� Z Fwo I zw W,z- o? xw w �°z zooN' oz o o w �xfOpw U oz caiQalFaz o o U p z z LL � =w J o y r a� oo _U � � � wYzwa� � W o� �� s o =1�iw�att Q fl1 zo xz a z �01173izz J N axzo o Q g ° �wzxoa� H w r� �N -w o z o'.-o'o? (n z0 1 °z a- o= - z °� p " Z zw Fr,gzwp �wwzw — _a x — _war o o N =�z�r �� w °� N0" U w O�wrr Zrez ww o wx Wiz- w z z zo <z o oa�¢zF W JxWo Fa z� oU 4 - °dN Z w° o�lawJz >z z a-���� Z woza� Q 0oo z �m a° F _ °p a...z o °o O o U ry rr v .n Ch F0 N w NUw C? _I-z J m 0 $w o F� Y� ? O < U a K m 0 O 2 Y z za m W Zp J wK V -- FJm� z m� z z w WtZU O w UQ Ww 2 Z w0 w rwoU 2z O o as Or > >N x Fw za ° Z u oQaW ao ° d �� a a� o oQ wxo m 0 w w ° > W J > pzm o oQ mg �� D J - =° w 0 — z7 —O w W g �o wo oz Q _ — ¢ �� �z w o? W I wz 99 pz C� H w _ 1xo �w _�- 'o of v; rZ aw W W° — — y-g 1� �� a a� L w oy d w .e ..Z� .t �a 1 wzz = zo U o �-� �m m? ww Z W a �¢i �- asw ° w3 Z .. E <p i z z z D Q° NI W..bZ ,E .E (9 tt w K z w 2 wW z1 W �rC 4N �mz z <v� p O° Fa°U OZ O(90 M1 °U_w Oa U— Kw 7w °z m w aw Fz °I F F� 3 wo Z' N° w U Oad -°U -1°U _ =1 Z ptliuone�uawnaoal tl 3Veu - p—%MOesti%told Wd 9eZ49a0ZIL4/b V H11�4�Wd ZE99ZOZIlN SI l VG09�3[G9Z09Z1 0\94 Iat db LLDZOSZ 00 lsZOZIV aI!d l-J w y O F$z sVX31 Z 61IVI301VOIUI0313 o IISIZIHO sndaoo Ailo o a, C n NOUV11I19VH3M OH03 AVNtlXVl o � a IUOdUIV 1VNOIIVNU3INI IISIUHO SldU00 `^ NOI-1-30 3-1 nss wax o w J°mz zoo �°❑o J o°ao ¢LL pa0� U z Qz Z—O w 0W0 dp xw0> Fa z0 6 OU z� wwooa 3 Q— x mmQao a w°� Nffi Oa~ O�Uw 2 w 2w a Z w >�� W � U d O W Q W F z O S w Q amp wza��� - wIz J m moa (n zx mo Z 5 mwx ❑ — ww e w oz = I w° I • •a M.U . m a 3: Iz J p mQ Z OzLU ¢o i\ 3 p UI LU; '• dI fn w Q I d I d •p • _Z LU Z Z) O > 48° w o w �cs, i�� z° U)w "Z 'm3 Jwa 3 z' as°a COw ❑ 0 Lz �Zw s�zw ma Aga z�0 o w»� mzo N �a 'Eo �Q — a¢- LLg� ��� o wZ �w izw m w a °o' U.. —°zw o�z LL zLL- wz m°� zN�� o �LLw awwz o�x csLLw wz — F° mwd ¢03 Q`O�w pm Y- Z Q� WU� z°F ztt~ p0 1. 'zOitt0 wo0 ? pia 0 Z. w 26 ¢ w �jOr m w7z U UULL OU yO0h as rl m<QF tai16LL u:� 0 w w U m OJ r a z m x° FWz 00 z3 >w w� owoo o °p UO 2 HO z❑j wU z Op TKO¢ - Z O°1 Um0 (� mo O O¢ z _ w0. a >pp? O ¢ZS�W G O o LL a J 0 — — — O p 2 z 0 0 W 0, wm ¢w O Sr tt z r—w0 Z F ¢� mOwcmaiW r� �N wZ — H F Q ~ w mm0 O ww FZ — a MQ K� OwaF OU (�� LL�= r WONwW CL iw Ww O O� _ _ Oow m0 �9¢=Fa wm U xya a bQ zdj0 ¢ �'G7 F� w Q WLL 2jO O Q~ ❑ O¢ F �F KJ Q�-W U'� pwmw a0 OZ~Qz w ¢ w0 ZOY ¢ �~ Kz a ¢F m O ¢O wU aK2m �o apN¢ 0 �z a°¢Ki Z i —° ¢z zFw w cs� �� wm 7 w -> z� oo=° �z F Ho a���ui J w a z< ¢o om❑p wz�wm� <¢� NO��=� Qz a° mi° oZ z om o❑¢ �FW O�zzam wW a4 Fw twwa��o� � ~ °z f z = J? Fa z ¢ o < o o LU ¢ a ¢ — ¢ moo �W3 o a wx a-i aE5 3� a 'Q o oo a o_o � LLJ N Fz� w� °2,z zm Y w-Z � zdo°z ° U aJ NWo xm g Wo zN 5 aa w q a�� oW°F o o Kz o ww N W u mN LL zoz � �o w J w �LLw y ��LLQ I � °¢mz oar °o wo° o W° �3 ° ozW m �Jz d° ��Qo o aim LLz Sao a `a'S °N �� ¢ wzN w w J� >o 'Zmo z m moo 'Z- ° � Zd< w §N i �� w❑� a =pww o� w zrwn0 =y WQOz a �a wiN Kw> LLwo°z z— o� �o o °W� �� °° �w �N .1— z Ho LLw� z s� o— % am 'x o� PN �o�wx �¢ w ? ¢'°w zQ Ewa `� o� o a� ? <w¢ a NF wx o'm� dzwa� o° w o >M WF --m >� ��is °ALL m rrw � om z m a¢a oa word, o0 ¢ _ a�� zz 'm°3 m w w aN _ acai a0 Oyu' _ LLoa�° x¢ m M h lo m m ae��ocewawcNoai 3e��a� - oa�v,�d m�ro oam,w�oi,wd ed.z�ezamwro. u Hn�aa Ne�>=�we zes szazi�ro s� 3 pcos33�ozosz� awv i�eb�vzosz oo�zaz�v any SVX31S, OVMJ SS300V33aV- SNOUZOSSSOUZ) o m �wxaM IISIHHO sn&&00 j� Ailo o Y`Q iFN� o NOIlV11I18VH3?J OHO3 AVMIXVl 0 2 o I-Od2IV�VNOIIVNJ31NI I1SIJHO snd JOO `^ 7 7S L'SE:3l3} £'ZZ jjO 6'9E'3l I 9'9L:IJO O SL 3 0 ro LE A 3 ¢o Qo ¢0 99'£:n l3 ¢o po O'0'.d 0��. ttvoi O'o:j O} I ttoo Zti E A3 3 LZ E-A3 3 bE'E A3 3 U 9ti -A3 3 " 0'6L--30 LL OL'8 A3 Lfi LZ-jj b'9£-3�3 M:3l3 1 LI Ll:j O o n U E 8L'j O n U 699E:j O I n U 559E:j O I n U LH'E:A3 Ob'E'A3 3 0 o EE'E A3 3 o 06 o 00 0:3d 96'9 :A31 N Zti6 :A30 ££'6 'A31 bZ'6 'A31 05'Z-'jj }m I o ¢ 06'1-:jj }n I o ¢y 66Z-''A } I o ¢N 00'£--33 } o a y Lb'6 :A3� " L9'6E:A3� Lb'6 :A37 ttiH A31 ¢ ¢ I ¢ ¢ w w w w 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3d��iaeu�,w�o en�u,e �omenow'-a�vvaEosszozum 5� � P«eoxw�osz� i awvaa i aao�ozo_zsowzoz�xai�j svx3i OVOU SS3OOV�JUV-z NOUO3S SSOaO o o m �yxoM IISIHHo sndvoo t� Ailo a r s =z�LL NOIlV11I18VH3?J OH03 AVMIXVl � o 1dOd2IV 1VNOI1VNJ31NI I1SItlHO Sfldwo `^ S I � I I an o n n hG E 33 60'E 'i10 9ti 6 A31 } ['SE A313 } °d } °o 00 ��3 �, 00 0��d 0'0 Z9'6E A31 U`�" ZC6i A31 U Za'9 :A31 IU" Va U¢ U¢ lol 6 I Q a vfz-:�d j 056 A31 h0'93� l6'bE-A313 bb'ie:A 13 I I I I 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 3v T'�laeyaivu'uo elf uoycep�ry�q�Wd Eo 99ZOZllm 5� l PlyE0xtt6a0sZ� I a�94a3 1 da0 ttoZo_Z eovu2oz�xal!S