Loading...
HomeMy WebLinkAboutM2000-279 - 08/22/2000MOTIONS - 8/22/00 5.a. Motion approving the reimbursement application submitted by Mark D. Stockseth, owner and developer of Lot 1, Block 1, Stockseth Tract, for the installation of an off- site, over-depth sanitary sewer collection line. ATTEST: Ar///r~Secretary M2000-279 APPUCATION FOR SEINERUNE REIMBURSEMENT We, Grand Slam, LLP., owner and developer of Lot 1, Brock 1. Stockseth Tract, hereby request reimbursement in the amount of $101,929.71 for the installation of the sanitary sewer collection line including overdepth cost, in conjunction with said Lot 1, Block 1, Stockseth Tract, as provided for by the City Ordinance No. 17396. Said $101,929.71 is the construction cost, including 7.5% Engineering, in excess of the lot/acreage fee, as shown by the cost supporting documents ettached herewith, subject to the maximum mount reimbursable formula in the Platting Ordinance. ///~(Oeveloper) ~f~"f~ I~Date) THE STATE OF TEXAS § COUNTY OF NUECES § This instrument was acknowledged before me on r~J-J~, [ ~ CERTIFICATION ,l~,by . Owner and Developer of Lot 1, Block 1, Stockseth Tract. sufficiency of funds in the Collection Une Trust Fund appropriation and approval by the City Council. or of Engineering glneering) 98(To3ar.frm Exhibit C Page ! of 5 The information submitted with this application for reimbursement has been reviewed and determined to be correct. Reimbursement is subject to: APPLICATION FOR SEWERLINE CREDIT We, Grand Slam, L. LP., owner and developer of Lot 1, Block 1, Stockseth Tract, hereby apply for $12,472.00 credit towards the sanitary sewer lot/acreage fee for the sanitary sewer collection line extension installed in conjunction with said tract as provided for by City Ordinance No. 17398. $ 187,898.17 is the construction cost including overdepth cost and a 71/2% Engineering fee, as shown by the cost supporting documents attached herewith. THE STATE OF TEXAS § COUNTY OF NUECES This instrument was acknowledged before me on AU~' /~/ , , ~ CI.ORIAP LOP !~""'~ M ' N EXPtRES N tary Public in and f te of Texas )~.~IFICA'I~N ' 20~0, by The information submitted'With this application has been reviewed and determined to be correct end a credit of $12,472.00 is herewith approved. 98053ac,frm Exhibit C Pa~e ~ of ~ REIMBURSEMENT APPLICATION AND SUPPORTING DATA OFF-SITE WASTEWATER COLLECTION LINE Legal Description: Acreage: Fee Value: Reference: Am AUgust 8, 2000 98053REM.APP(egN Lot 1, Block 1, Stockseth Tract 13,646 $12,472.00 Platting Ordinance - SanHaW Sewer [Collection Line Extension, V.B.6.f.(2)] Maximum Reimbursement Eligibility 60% (av9 pipe dia. in inches) (Fee Value) - 50% (9.88')($12,472.00)- Less Sever Acreage Fee(fee not peid at Ume of pieffif.3) Reimbursement Requested Maximum reimbursement eligibility Plus over-depth conslderaUon beyond developers needs (see 'E' below) Total Total Requested C. Condmction Contract Coda, Off-site Senitch/Sewer with Over-depth ITEM # DESCRIFRON QUANTITY/UNIT UNIT PRICE 1. I0" PVC Pipe 22'-24' Cut 50 LF $90.00 2. 10' PVC Pipe 20'-22' Cut 175 LF 80,00 3. 10' PVC Pipe 18'-20' Cut 535 LF 70,00 4. 10' PVC Pipe 12'-14' Cut 140 U: 50.00 5. 10' PVC Pipe 10'-12' Cut 150 LF 40.00 6. 10' PVC Rpe 8'-10' Cut 500 U: 28.00 7. 10' PVC Pipe 6'-8' Cut 300 LF 24.00 8. 10' PVC Pipe 'l~ru Casing 50 LF 28.00 9. 8' PVC Pipe 4'-6' Cut 48 LF 21.00 10. 8' PVC Pipe 6'-8' Cut 72 LF 19.00 11.8' PVC Pipe 4'-6' Cut 48 LF 15.00 12. FG Manhole 22'-24' Depth I EA 4,500.00 13, FG Manhole 20'-2~ Depth I EA 4,500.00 14. FG Manhole 18'-20' Depth 2 EA 3,650.00 15. FG Manhole 10'-12' Depth t EA 2,750.00 16. FG Manhole 6'-8' Depth 2 EA 2,100.00 $81,611,68 $49,139,68 $49,139.68 521790.03 $101,~9.71 TOTAL COST 14,000,00 6,000.00 14,000,00 7,200,00 1,400.00 966.00 1,368.00 720.00 4,500.00 4,500,00 7,300.00 2,750.00 4,200,00 Exhibit C Page 3 of 5 17. FG Manhole 4'-6' Depth 18. 10' Drop Connection e~ Manllde A-J, 19. Pavement patching 20. Explorator/Excava~ms 21. Crushed Stone Embedn~nt for I0' Sewer PIpe 22. Traffic Control Dudng Construction 24. Steel Casing Pipe ~'-24' Deep I EA 1,600.00 1.600.00 8.0 LF 87.50 700.00 180 SY 45.00 8,100.00 1 LS ~ 3,500.00 3,500.00 760 LF 9.50 7,220.00 1 LS 4,750.00 4,750.00 2066 LF 2.50 5,165.00 50 LF 395,00 191750.00 Total $168,639.00 Dm Construction Contract Cost, Off-site Sanitary Sewer without Overdepth (Detailed cost Itemlzatlo~ in Subclvislon File) Over-depth/Other Reimbursement Costs $125,682.00 1. Over-depth costs (Total of C minus D) $42,957.00 2. 50% SUp-Line F.,cis~ng Menhole at leopard end Main (City fund 50%) 3,500.00 3. 50% Acqustment of Sewer Une, Sunlide Rd. near BeNden DfNe (City funds 50%) 2~650.00 Subtotal $49,107.00 Consulting Fee (7.5%) 31683.03 Grand Total ~52,790.03 Exhibit C Page4of5 LOT 1, BLOCK 1, STOCKSETH TRACT PROPOSAL ITEMS OFFSITE SANITARY SEWER Offsite Sanitary Sewer without Overdef~th ITEM # DESCRIPTION 10' PVC Pipe 14'-16' Cut 2. 10' PVC pipe 12'-14' Cut 3. 10' PVC Rpe 10'-12' Cut 4. IO'PVCRpeB'-IO'Cut 5. 10' PVC Pipe e-8' Cut 6. 10' PVC Pipe 4'-6' Cut 7, lr PVC Pipe ~ltm Casing 8, 8' PVC Pipe 6'-8' Cut 9. 8' PVC Pipe 4'-6' Cut 10. FG Manhole 14'-16' Depth 11. FQ Manhole 12'-14' Depth 12. FG Manhole 10'-12' Depth 13. FG Manhole 6'-8' Depth 14. FG Manhole 4'-6' Depth IS. Pavement Psiriling 16. E~omtory Excavations 17. Trench Sefety for Excavations 18. Traffic Control During Construction 19. 16' Steel Casing Pipe 14'-16' Deep QUANTITY/UNIT 200 LF 480 LF 400 LF SO0 LF 300 LF 46 LF 50 LF 72 LF 48 LF 2 EA 2 EA 1 EA 2 EA 1 EA 180 8Y 1 L8 2,016 LF I LS 50 LF UNIT PRICE $50.00 40.00 35.00 28.00 24.00 21.00 28.00 19.00 15.00 3,150.00 2,7~0.00 2,100.00 1,~00.00 a,~O.O0 1.75 To~al August 8, 2000 98053PRP. FRM(Sgs) TOTAL COST $10,000.00 18,000.00 14,000.00 14,000.00 7,200.00 g66.00 1,400.00 1,388.00 720.00 6,300.00 2,750.00 4,200.00 1,600.00 8,100.00 3,500.00 3,528.00 4,750.00 17~500.00 $125.682.00 Exhibit C Pagegof5 EXISTING 10" GRAVIP( SANITARY SEWER 23' DEEP STA, 10" OVERDEPTH MAIN DR. STA. 8+10.32 SUNTIDE RD. OFFSITE SANITARY SEWER 2066 IF: RNEW RD. RHEW RD. 20+66 '81TE' (18.646 AC.) HUNTER RD. SANITARY SEWER LINE DATA STATION PIPE D~A. LENGTH (FF) 0+00 TO 19+46 i0" 1946, 19+46 TO 20+66 8" 120 TOTAL 2066 ,NOTE: 810.32' (STA. 0+00 TO 8+10.32) OF 1946' INSTALLED OVERDEPTH COMP NO.: 98053\EXHIBITDWO LOT 1, BLOCK 1, STOCKSETH TRACT WASTEWATER COLLECTION LINE REIMBURSEMENT DEPT. 1, BLOCK h,/ STOCKSETH TRACT / / / ,/" Y/' LOCATION MAP SCALE: 1" = 600' OF ENGINEERING SERVICES PLOT SCALE: 1" 600' PLOT DATE: 08/11/00 EXHIBIT 'B" SHEET 1 OF I