Loading...
HomeMy WebLinkAboutM2000-365 - 10/10/2000MOTIONS- 10/10/00 12.a. Motion approving the reimbursement application submitted by Hossein Mostaghasi, owner and developer of Brighton Village Unit 8A, for the installation of 620 linear feet of an off-site 8-inch PVC sanitary sewer collection line and replacement of an existing manhole. ATTEST: Arm~creta ry City of Corpus Christi M2000-365 APPLICATION FOR SEWER LINE CREDIT I, Hossein Mostaghasi, owner and developer of proposed Brighton Village Unit 8A, hereby apply for $12,366.00 credit towards the sewer lot/acreage fee for the collection line extension installed in conjunction with Brighton Village Unit 8A Subdivision as provided for by City Ordinance No. 17396. The construction cost is $26,164.56, including 7-1/2% Engineering, as shown by the cost supporting documents attached herewith. (Developer) (Date) THE STATE OF TEXAS COUNTY OF NUECES This instmment was acknowledged before me on by Hossein Mostaghasi, Owner and Developer of Brighton Village Unit 8A. 7~?~ ,2000 Notary Public in and for Nueces County, Texas CERTIFICATION The information submitted with this application has been reviewed and determined to be correct and a credit for $12,366.00 is herewith approve& Exhibit C Page 1 of 4 APPLICATION FOR SEWERLINE REIMBURSEMENT I, Hossein Mostaghasi, owner and developer of proposed Brighton Village Unit 8A, hereby request reimbursement of $55,929.71 for the installation of the sewer collection line and replacement of an existing manhole in conjunction with Brighton Village Subdivision, as provided for by City Ordinance No. 17396, and as requested by the Wastewater Department. Said $55,929.71 is the construction cost, including 7-1/2% Engineering, as shown by the cost supporting documents attached herewith. (Developer) (Date) THE STATE OF TEXAS COUNTY OF NUECES n This instrument was acknowledged before me on ~ i>~l'e rr~ [~t'- ~. '7_, ,2000 by Hossein Mostaghasi, Owner and Developer of Brighton Village Unit 8A. Notary Public in and for Nueces County, Texas CERTIFICATION The information submitted with this application for reimbursement has been reviewed and determined to be correct. Reimbursement is subject to: (a) sufficiency of funds in the Collection Line Trust Fund (b) appropriation and approval by the City Council Exhibit C Page 2 of 4 Special Services Sept. 7, 2000 CITY REIMBURSEMENT PER PLATTING ORDINANCE V.B.6.1 .(2) Maximum reimbursement for a sanitary sewer collection line off-site extension is limited to 50% of the mathematical product obtained by multiplying the off-site average diameter in inches by the fee value of the property. A. SUPPORTING DATA FOR OFF-SITE EXTENSION REIMBURSEMENT Legal Description: Existing Acreage: Date Platted: Off-site Extension: Fee Value: Brighton Village Unit 8A 10.45 December 1999 8-inch PVC line, 620 feet (Lots x WW Lot Fee = Fee Value) 54 lots x $229/lot = $12,366.00 Credit* Maximum Reimbursement Eligibility: 50%(8")($12,366.00') = $49,464.00 Off-site Sanitary Sewer Actual Construction Costs: 323' x 8" PVC (12'-14' cut) @ $30/LF 297' x 8" PVC (10'-12' cut) @ $26/LF 1 - 4' Manhole @ $1700 EA Subtotal General Contractor's Profit and Bond (27.35x$19, 112.00) Subtotal Engineering Fee (7.5%) Total $ 9,690.00 7,722.00 1,700.00 $19,112.00 $24,339.13 1,825.43 $26,164.56 Allowable Reimbursement: Actual construction cost ($26,164.56) does not exceed maximum allowable reimbursement ($49,464.00). Lot fees were paid at time of platting. Therefore, reimbursement requested is $26,164.56. B. SUPPORTiNG COST DATA FOR MANHOLE REPLACEMENT. The City's Wastewater Department requested that the developer replace an existing 4-foot Exhibit C Page 3 of 4 Special Services L.F. Sept. 7, 2000 fiberglass sliplined brick manhole with a new 5-foot fiberglass manhole. The following lists the cost data for which the developer is eligible for 100% reimbursement: UNIT DESCRIPTION QUANTITY UNIT PJ~Ell TOTAL Pavement repair 50 SY 37.48 $1,873.78 Trench safety 60 LF 14.19 851.20 Remove existing clay pipe 60 LF 21.91 1,314.55 8" Sanitary Sewer (12'-14') 60 LF 80.00 4,800.00 Fiberglass manhole 1 EA 4,197.97 4,197.97 Remove and replace curb & gutter 15 LF 51.99 779.02 Remove and replace 5' sidewalk 60 LF 12.13 Haul off excess excavation 145 CY 11.07 Barricades 1 LS 4,337.12 Remove existing manhole 1 EA 1,254.55 Subtotal General Contractor's Profit and Bond (27.35%) Subtotal Engineering Fee (7.5%) Total 728.02 1,605.85 4,337.12 A,254.55 $21,742.06 5,946.45 $27,688.51 2.,076.64 $ 29,765.15 C. TOTAL REIMBURSEMENT ELIGIBILITY. Off-site Sanitary Sewer Line Extension (See A above) Manhole Replacement (See B above) Total $ 26,164.56 $ 55,929.71 Exhibit C Page 4 of 4