Loading...
HomeMy WebLinkAboutM2000-402 - 11/14/2000MOTIONS - 11114100 13.a. Motion approving the reimbursement application submitted by Aransas Cliffs Development Company, Ltd., developer of Lots 1-11 and 54-64, Block 16, Lots 1-6 and 59-64, Block 116 and Lots 1-4 and 54-64, Block 216, Port Aransas Cliffs, for the installation of 83 linear feet of an off-site 1 O-inch PVC sanitary sewer collection line. ATTEST: M2000-402 REIMBURSEMENT APPLICATION AND SUPPORTING DATA OFF-SITE WASTEWATER COLLECTION LINE August 28, 2000 88039REM.APp(sgs) Legal Description: Acreage: Fee Value: Reference: Lots I - 11, and 54 - 64, Block 16, Lots 1 - 6 and 59 - 64, Block 116, and Lots 1 - 4 and 54 - 64, Block 216, Pod Amnsas Cliffs $3,610.46 Platting Ordinance - Sanitary Sewer [Collection Line Extension. V.B.6.f.(2)] Maximum Reimbursement Eligibility 50% (avg pipe dia. In Inches) (Fee Value) =, 50% (10')($3,610.46)= Less Sewer Acreage Fae(fee not paid at time o! platting) Reimbursement Requested 1. Maximum reimbursement aliglblllty $18,052.30 31610.46 $14,441.84 $14,441.84 Construction Contract Costs, Off-site Sanitary Sewer ITEM # DESCRIPTION QUANTITY/UNIT 1. 10" PVC PIpe, 10' - 12' cut 63 LF 2. 10' PVC Pipe. 8' - 10' cut 10 LF 3. 10" PVC Pipe, 6' - 8' cut 10 LF 4. Fiberglass Manhole 10' - 12' I EA 5, Fiberglass Manhole 4' - 6' I EA 6. Pavement Patching 43 SY 7. Traffic Control Dudrig ConsbucUon I LS UNIT PRICE TOTAL COST $101.50 $6,394.50 71.00 710.00 17.50 175.00 5,200.00 5,200.00 1,450.00 1,450.00 90.00 3,870.00 2,000,00 2,000.00 $19,799.50 7 1/2 % Engineering 1.484.96 $21,284.46 Exhibit C Page 1 of 3 APPLICATION FOR SEWERUNE CREDIT We, Aransas Cliffs Development Company, Ltd., developer of Lots I - 11 and 54 - 64, Block 16, Lots 1 - 6 and 59 - 64, Block 116 and Lots I - 4 and 54 - 64, Block 216, Port Aransas Cliffs, hereby apply for $3,610.46 credit towards the sanitary sewer acreage fee for the sanitary sewer collection line extension installed in conjunction with said lots as provided for by City Ordinance No. 17396. $21,284.46 is the construction cost including 71/=% Engineering as shown by the cost s ting documents attached herewith. pany, Inc., General Partner of Aransas Cliffs Development Company, Ltd. THE STATE OF TEXAS § COUNTY OF NUECES {} This instrument was acknowledged before me on ~ L1 (:~L,'~r ~ ,2000, by David M. Coover, Jr., President of Aranses Cliffs Development Comicany, Inc., General Partner of Aransas Cliffs Development Company, Ltd., Developer of Lots 1 - 11 and 54 - 64, Block 16, Lots 1 - 6 and 59 - 64, Block 116 and Lots I - 4 and 54 - 64, Block 216. Port Aransas Cliffs. SANDItA E. NASH Notary Public in and for the State of Texas CERTIFICATION The information submitted with this application has been reviewed and determined to be correct and a credit of $ 3,610.46 is herewith approved. ~r/~f Engineering (City Engineering) Exhibit C Page 2 of 3 APPLICATION FOR SEWERLINE REIMBURSEMENT We, Aransas Cliffs Development Company, Ltd., developer of Lots I - 11, and 54 - 64, Block 16, Lots I - 6 end 59 - 64, Block 116, end Lots I - 4 and 54 - 64, Block 216. Port Aransas Cliffs, hereby request reimbursement in the amount of $14,441.84 for the installation of the sanitary sewer collection line in conjunction with said lots as provided for by the City Ordinance No. 17396. Said $14,441.84 is the construction cost, including 7.5% Engineering, in excess of the acreage fee, as shown by the cost supporting documents attached herewith, subject to the maximum Arensas Cliffs Development Company, Inc., General Partner of Aransas Cliffs Development Company, Ltd. THE STATE OF TEXAS § COUNTY OF NUECES § This instrument was acknowledged before me on f'~fl.~O~ ~-:~J~- ;S~'.~ , 2000, by David M. Coover, Jr., President of Aransas Cliffs Development Company. Inc., General Partner of Arensas Cliffs Development Company, Ltd., Developer of Lots 1 - 11 and 54 - 64, Block 16, Lots 1 - 6 and 59 - 64, Block 116 and Lots I - 4 and 5d, - 64, Block 216, Port Aranses Cliffs, ~' .........' SAN~RAE. NASH '~   MY COMMISSION EXPIRES ... Notary Public in and for the State of Texas CERTIFICATION The information submitted with this application for reimbursement has been reviewed end determined to be correct. Reimbursement is subject to: sufficiency of funds in the Collection Line Trust Fund appropriatigp end approval by the City Council. Dir or ineering ngineering) //~/~ (Date) 8~9,~r Exhibit C Page 3 of 3