Loading...
HomeMy WebLinkAboutM2005-009 - 01/11/200511. MOTIONS - 01/11/05 Motion authorizing the City Manager or his designee to execute Amendment No. 1 to the Contract for Professional Services with HDR Engineering, Inc., of Corpus Christi, Texas in the amount of $433,234, for a total restated fee of $458,207 for the Concrete Lined Channel Rehabilitation and Bddge Rehabilitation Project as follows: Concrete Lined Channel Rehabilitation: Van Galen, Phase 1 Concrete Lined Channel Rehabilitation: Carroll West Concrete Lined Channel Rehabilitation: Airport, Phase 2 Concrete Lined Channel Rehabilitation: Flynn Shea Bddge Rehabilitation: Kingsbury Ddve Bridge Rehabilitation: Lexington Road Drainage Channel Excavation: Saratoga Boulevard Bddge ATTEST: A,ma Samuel L. Neal, Jr., Mayo~'/ City of Corpus Christi M2005-009 CITY OF CORPUS CHRISTI CERTIFICATION OF FUNDS (City Charter Article IV, Sections 7 & 8) I, the Director of Finance of the City of Corpus Christi, Texas (or his/her duly authorized representative), hereby certify to the City Council and other appropriate officer that the money required for the contract, agreement, obligation or expenditure described below is in the Treasury to the credit of the Fund specified below, from which it is to be drawn, and has not been appropriated for any other purpose. City Council Action Date: January 11, 2005 Motion authorizing the City Manager, or his designee, to execute Amendment No. 1 to the Contract For Professional Services with HDR Engineering, Inc. in the amount of $433,234, for a total restated fee of $458,207, for the Concrete Lined Channel Rehabilitation and Bridge Rehabilitation Project as follows: · Concrete Lined Channel Rehabilitation: Van Galen, Phase 1 · Concrete Lined Channel Rehabilitation: Carroll West · Concrete Lined Channel Rehabilitation: Airport, Phase 2 · Concrete Lined Channel Rehabilitation: Flynn Shea · Bridge Rehabilitation: Kingsbury Drive · Bridge Rehabilitation: Lexington Road · Drainage Channel Excavation: Saratoga Boulevard Bridge Amount Required: $433~234 Fund Name Fund Org. Account Project No. No. No. No. Amount Storm Water: Van Galen 4525 00000 550950 160675 Storm Water: Carroll West 4525 00000 550950 160680 Storm Water: Airport, Ph 2 4525 00000 550950 160255 Storm Water: Flynn Shea 4525 00000 550950 160340 Storm Water: Kingsbury 4525 00000 550950 160665 Storm Water: Lexington 4525 00000 550950 160670 00000 550950 160615 Storm Water: Saratoga ~ 4525 Total (.~t,~r:t~. ~)/~p~'¢. ) I I Certification Not Required 20,878.00 45,535.00 69,183.00 44,289.00 37,379.00 37,379.00 178,591.00 $433,234.00 Director of Fin~'n~al§ervices Date: z//~///_) ~