Loading...
HomeMy WebLinkAbout02755 ORD - 04/25/1950AN ORDINANCE AMENDING ORDINANCE NO. 2540 PASSED AND APPROVED BY THE CITY COUNCIL ON THE 14TH DAY OF NNE A.D. 1949, BY AMENDING SECTION 3 OF SAID ORDINANCE CORRECTING THE ASSESSMENTS LEVIED. AGAINST ABUTTING PROPERTY OWNERS ON WATER STREET FROM THE NORTH PROPERTY LINE OF FITZGERALD STREET TO.THE SOUTH PROPERTY LINE OF FURMAN AVENUE; AND DECLARING AN EMERGENCY. BE IT ORDkINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. That Section 3 of Ordinance No. 2540 passed and approved by the City Council on the 14th day of June, 1949, is hereby amended and said Section 3 of said ordinance shall hereafter read as follows, to-wit: "SECTION 3. That in pursuance of said ordinance, duly enacted, by said City Council, authorizing and ordering the improvement of Water Street, within the limits hereinabove named and defined, and in pursuance of said proceedings heretofore had and enacted by said City Council in reference to said improvements and by virtue of the powers vested in said City with respect to said street improvements by the Laws of the State of Texas and the Charter of said City, with particular reference to Chapter 106 of the Acts bf the First Called Session of the 40th Legislature of the State of Texas, known and shown as Article U05—B of Vernonls Annotated Civil Statutes of Texas, as amended, there shall be, and is hereby levied, assessed and taxed against the respective parcels of property abutting upon said portion of said street, and against the real and true owners thereof, whether such real and true owner or owners be named or correctly named herein or not, the several sums of money hereinbelow mentioned and itemized opposite the description of the respective parcels of said property, the number of front feet of each and the several amounts assessed against same and the real and true owner or owners thereof, and the names of the apparent owners thereof, all as corrected and adjusted by said City Council, being as follows, to -wit: �'7SS .gheet 1 Final PAVING ASSESSMENT Water Str-et from N. Pr.Line Fitzgerald St, to S. Pr. Line Fur*an Avenue Pavement Gravel Concrete Base lilt Hot Mix Surface M & J Construction Company, Beeville, Texas Contractor Contract Date January 288, 1949 60.00 Ft.. Roadway Curb cost per lineal foot 0.70 9.59572146 Paving rate per front foot Sidewalk cost per sq. foot 0.33 sq, ft. Sidewalk rate perdxmz foot , Property Owner Name of Addition Black Number Lot Number Property Frontage Paving Cost Sidewalk Ft Sidewalk Cost Cu 6Z Lin. Ft. Curb)& (83 KCost Total Amount FITZ ERALD STREET M=ECTION Clyde M. Allen & Frank C. Allen (E) Beach Portion 54 6 -5 -4 & 3 2001 1919.14 2O01x4t 264.00 2183,14 Walter Foster Estate (E) Beach Portion 54 2.-1 loot 959.57 100+x4r 132.00 1091.57 J.B.Flanagan and wife, Bessie Flanagan (W) Beach Portion 55 6&N.15tof 65t 623.72 623.72 B. D. Powell (W Beach Portion 55 3- 4&S35'o 5 1351 1295.42 .1295.42 M.C. Lipscomb and wife, Sarah Grace Lipscomb (W) Beach Portion 55 2 501 479079 479.79 Katherine Huffman (W) Beach Portion 55 1 501 479079 479.79 PALO ALTO STREIT INTERS CTION Mrs. Lydia Lass (E) Water Beach 13 6 50t 479.79 501x4t 66.00 545.79 Est. of W.W.Jones,Decd.(W) Bea oh Portion 45 6-'5 1001 959057 959.57 Melinde Scheele (E Water Beach 13 5 501 479.79 5O'x4t 66.00 545079 F. H. Binz and Henry F. Bina (E) Water Beach 13 4 501 479.79 479.79 Williamson Motor Co. (E) Water Beach 13 3-2 -1 1501. 1439.36 1501x4' 198.00 1637.36 Maggie Weidenmueller, Margaret & Mollie McTiernan (W) Beach Portion 45 4 50t 479.79 479.79 W. M. Singer Est. (W) Beach Portion 45 3^2 1001 959.57 959.57 Sydney E. Herndon & wife, E. Faynette Herndon (W) Beach Portion 45 1 50t 479079 479.79 POWEI STREET DITERSECTION City of Corpus Christi (E) Water Beach 12 - 2 -3 ^4- 3002 287£3.71 2878.71 Southwest Enterprixe Inc. (I Beach Portion 38 6 -5--4 1501. 1439.36 1439.36 Ed Goodfriend, Trustee (W) Beach Portion 38 3 -2 -1 1501 1439.36 150'x9. ' 470.25 1909.61 rubuc Works Dept., Corpus C:hnstl, Texas Engineering Division Compiled Checked Sheet- 2 Final PAVING ASSESSMENT Water Street from N. Pr. Line Fitzgerald St. to S. Pr. Line of Furman Ave. Pavement Gravel Concrete Base 1j" Hot Mix Surface M & J Construction Co., Beeville, Texas Contractor Contract Date January 28, 1949 Curb cost per lineal foot 0• Sidewalk cost per sq. foot 0.33 60.00 9.59572146 _Ft.. Roadway rate per front foot Sidewalk rate per front foot Property Owner Name of Addition Block Number Lot Number Property Frontage Paving Cost Sidewalk KYAZ= Sidewalk Cost Cu b&X7A7t Lin. Ft. Curl lit ®9& Cost Total Amount BELD9N STREET INYERSECIION City of Corpus Christi (E) Water Beach 11 - 2-3-4-5 3001 2878.71 2878.71 McIver Furman (W) Beach Portion 32 6-5 1002 959.57 100x8.51 280.50 1240.07 James Santikos (W ) Beach Portion 32 4 502 479.79 5Ox8.5 140,25 620.04 Public Motors, Inc. (W ) Beach Portion 32 3-2 -1 1502 1439.36 150x8.5 420.75 1860.11 AUBR9 STREET 24TERSECIION Simon & Ed Grossman (E) Water Beach 10 6 501 479.79 50x9.5 156.75 636.54 Theodore F. Weber (E) Water Beach 10 5 50' 479.79 479.79 Winnie Hess E Water Beach 10 4-3 1001 959.57 100x9.5 313.50 1273.01 Bonnie Hays (E) Water Beach 10 2-r1 1002 959.57 100x9.5 313.50 1273.07 113 Divided Interest Adel Oatman Wright Hazel Oatman Butler Hermine Oatman Reed (W) Beach Portion 28 6-5 1001 9590 100x9.5 313.50 1273.07 Julia B. Cadlwell Est. (W) Beach Portion 28 43 1001 959.57 100x9.5 313.50 1273.07 Princess Louise Hotel Inc(W Beach Portion 28 2-1 1000 959.57 959.57 MANN STREET ERSECTI N J. Roy Murray, Trustee (E) Water Beach 9 6 -5-•4 1501 1439.36 1439.36 George Plomarity (E) Water Beach 9 3-2-1 150° 1439.36 150x9.5 470025 1909.61 J. E. Loyd (W) Beach Portion 24 6 501 479.79 479.79 Charles B. Kilgore (W) Beach Portion 24 5•.4x.3 1501 1439.36 1439.36 Simon Gugenhefm Est. (W Beach Portion 24 2-1 loot 959.57 959.57 Public Works Dept., Corpus Christi, Texas Engineering Division Compiled J.R.C. Checked E.L.K. Sheet 3 Final _PAVING ASSESSMENT Water Street from N, Pr. Line Fitzgerald St. to S. Pr. Line Furman Ave. Pavement Gravel Concrete Base 1i" Hot Mix Surface Contract Date January, 28, 1949 Curb cost per lineal f Sidewalk cost per sq. M & J Construction Co., Beeville, Texas Contractor 60,00 Ft.. Roadway 9.59572146 Paving rate per front foot Sidi llr .. +e - F...,.+ 4....a Property Owner Name of Addition Block Number Lot Number Property Frontage Paving Cos[ Sidewalk Sidewalk Cost Cu.b Pte& Lin. Ft Curb A GM= Cost Total Amount sq. .rt TWIG STREET I ERSECT ON Sidney P. Chandler (E) Water Beach 8 6 50t 479.79 479.79 C,onroe Drilling Co. (E) Water Beach 8 5 501 479.79 479.79 Ed Hoffman (E) Water Beach 8 4- 3 -2,_1 2001 1919.14 1919.14 Allied Finance Co. (W) Beach Portion 7 6 50'. 479.79 479.79 F. F. Clements (W) Beach Portion 7 5 501 479.79 50x8.51 140,25 620.04 E. B. Baker, Trustee (W) Beach Portion 7 4 -3 -2^1 200' 1919.714 200x8.51 561.00 2480.14 TAY ]OR STREET INTERSEC ION F. F. Clements, Rogers & James South (E) Water Beach 7 6-5 1001 959.57 20x9.1 62.70 1022.27 Ruth Sparks, Edwin Flato & Frank Cech (E) Water Beach 7 4 -3 -2-1 2001 1919.14 65x9. ' 203.77 735x5. ' 245.02 2367.93 Mary & Lattie H. Carroll, & Katherine C. Taylor (W) Beach Portion 6 6 501 479.79 50x8. ' 140.25 620.04 Evelyn Grant Engelking (W) Beach Portion 6 5 50' 479.79 50x8. ' 140.25 620.04 D. W. Grant (W) Beach Portion 6 4-3 1001 959.57 959.57 E. Franklin, Frederick W. Robert H. Flato " .',, Harry G. Heaney, B.Sxl.jacks & Retta G. Jackson (W) D._Ll:_ TAP__l__ Beach Portion 6 2 1 loot 959.57 959.57 .... ...,. ay.., vca v- vaaa ' a as Engineering Division Compiled Checked SHEET Final PAVING ASSESSMENT Water Street _from N Pr. Line Fitzgerald St to S Pr. Line Furman Ave Pavement Gravel Concrete Base 1-i" Hot Mix Surface M & J Construction Co., Beeville, Texas Contractor Contract Date January 28, 1949 60.00 Ft.. Roadway Curb cost per lineal foot 0.70 9.595721-46 Paving rate per front foot Sidewalk coat per sq. foot 0.33 Sidewalk rate per front foot Property Owner Name of Addition Block Number Lot Number Property Frontage Paving Cost Sidewalk Pd67.�� Sidewalk Cost Cu,68= F& Lim Ft. Curb X (; Cos Total Amount STARI STREET DITERSECTION E Fb� Magnolia Petroleum Co. (E) Water Beach 6 6 ^5 1001 (959.57) (959.57; Adjusted to 479.79 479.79 New Nueces Hotel Co. (E) Water Beach 6 Lu- 3,2-.1 200' 1919.14 136x945 426.36 2345.50 Hugh Cronkey Massie, Annie Cronkey Regale, William M. Sutherland, and H. R. Sutherland Est. (W Beadi Portion 5 6 501 479.79 479.79 G.N. & J.L. Scogin (W Beach Portion 5 5 501 479.79 479.79 Beatrice Mallinson & Annie Bernbaum (W) Beach Portion 5 4 501 479.79 479.79 New Nueces Hotel Co. (W) Beach Portion 5 3 -2-1 150' 1439.36 1439.36 PEOPLES STREET INTERSECTION Aileene Moore Waters (E) Water Beach 5 6 50' 479.79 50x9.5 156.75 501 35.00 671.54 J. Orren Moore (E) Water Beach 5 5 50' 479679 50x9.5 156.75 50' 35.00 671.54 Ruth Moore Baker (E) Water Beach 5 4 50' 479.79 479.79 Robert Henry Flato (E) Water Beach 5 3 501 479.79 50x9.5 156.75 636.54 Est. Ellen Merriman (E) water Beach 5 2-1 100' 959.57 50x9.5 156.75 1116.32 The Texas Company (W) Beach Portion 4 6 50t 479.79 499.79 D.W. Grant, Trustee (W) Bead Portion 4 5 -1.251 f4 51.2 1 491.78 491.78 Annie U. Johnson (W) Beach Portion 4 4 48,7" 467o80 467.80 Annie U. Johnson (W) Beach Portion 4 3 50' 479.79 479.79 Guaranty Title & Trust Co., Trustee (W) Beach Portion 4 2r1 100' 959.57 959.57 Public Works Dept., Corpus Christi, Texas Engineering Division Compiled Checked Sheet 5 Water Street Final PAVING ASSESSMENT from N. Pr. Line Fitzgerald St. to S. Pr. Line Furman Ave, Pavement Gravel Concrete Base 142 Hot Mix Surface M & J Construction Co., Beeville, Texas Contractor Contract Date_ January 28, 1949 60.00 Ft.. Roadway Curb cost per lineal foot 0.70 9.59572146 Paving rate per front foot Sidewalk cost per sq. foot 0.33 Sidewalk rate per front foot Property Owner Name of Addition Block Number Lot Number Property Frontage Paving Cost Sidewalk tSGZ Sidewalk Cost Curb&ZZY& Lin. Ft Curb 8 GMaCost Total Amount SCHArZELL STREET INTERQECTION �r First Savings & Loan Asain. of Corpus Christi (E) Water Beach 4 6 501 479.79 479.79 Birge Holt, Edwin Flato Edwin Flato, Trustee tE) Water Beach 4 5-4-3 & N of 2 175.11 1680.21 1680.21 J. Orren Moore (E) Water Beach 4 S of 2 j N 12.51 0 1 37.5 361.00 361.00 J.A.C. Baker (E) Water Beach 4 337.7 of 1 37.7 361.95 361.95 Eats. S. Gugenheim & H. Cohn (W) Beach Portion 3 6 50.21 481.70 481.70 Est. Jennie B. Jordt (W) Beach Portion 3 5 50.2. 481,70 481.70 Dick Prassel (W) Beach Portion 3 N3D.21of 30o2l 289.79 289.79 Medical Professional Bldg Corp. (W) Beach Portion 3 S201 of 4 201 191.91 191491 A.A. Lichtenstein,`rustee M.L. Lichtenstein,Trustee(W Beach Portion 3 3-2 -1 150.61 1445.11 14/a5.1-1 LAWRENCE STREE INTERSECTION Ruth Sparks (E) Water Beach 3 5- 4 -3 -2^ 301. 1 2890.23 2890423 Ettie T. Baker (TiT) Beach Portion 2 6 50.2 .481.70 481.70 I. M. Alexander (W) Beach Portion 2 5 50.2 481.70 .481.70 Milton H. Friedman,Tr. (W) Beach Portion 2 4 50.21 481.70 481.70 Est. R.H. Coleman (W) Beach Portion 2 3-2 100.4 963.41 963.41 Ed Goodfriend (W) Beach Portion 2 1 50.21 481.70 481.70 Public Works Dept., Corpus Christi, Texas Engineering Division Compiled Checked sheet 6 Water Street phlai PAVING ASSESSMENT frnm N. Pr. Line Fitzgerald to S. Pr. Line Furman Avenue Pavement Gravel Concrete Base 11° Hot Mix Surface Contract Date January 28, 1949 Curb cost per lineal foot 0.70 Sidewalk cost per sq. foot 0.33 M & J Construction Co., Beeville, Texas Contractor 60.00 Ft.. Roadway _409572146 Paving rate per front foot rate per front foot Property Owner Name of Addition Block Number Lot Number Property Frontage Paving Cost Sidewalk LUMEZ Sidewalk Cost Curb &30M Lin. Ft. Curb t CKK& Cost Total Amount WILL ULM STREE INTERSECTION U14- ft- Est, John Mircovich (E) Water Beach 2 6-5 1001 959057 100x4.5 148.50 1108.07 Geo. Jones, Inc„ (E) Water Beach 2 4 50' 479.79 50x4.5 74.25 554.04 Est. S. Gugenheim and H. Cohn (E) Water Beach 2 3 501 479.79 50x4.5 74.25 554.04 C.J. Childers, Jr. (E) Water Beach 2 2 50" 479.79 479.79 A.T. McMurray and F.J. Smith, Trustee;' (E) Water Beach 2 1 501 479.79 479.79 Servants of the Holy Ghost (W) Beach Portion 1 6 -5 1001 959.57 100x5.5 181.50 1141.07 C.C. Theatres Inc. (W) Beach Portion 1 4 50t 479.79 50x9.5 156.75 636.54 Est. of Amelia and Margret Muely (W) Beach Portion 1 3+-2 loot 959.57 90x5.5 163.35 1122.92 Alfred Dorsogna (W) Beach Portion 1 1 50' 479.79 479979 LAGU t STREET TERSEC ION Central Power & Light (E) Water Beach 1 4-3 -2-1 200= 1919.14 100x8.5 280.50 1001 70.00 2269.64 Centrail Power & Light (E) Water Beach Arroyo Arroyo 35.9V 345.16 35.97x8 5 100.89 35.97 25.18 471.23 Central Power & Light .(W) Beach Portion 15 4 -3 -2 -1 2041 1957.52 189x9.5 392.51 2350 aQ3 Central Power & Light (W) Beach Portion Arroyo Arroyo 36.141 346.88 36.15x9 5 113.33 460.21 George H. Jones,Inc. (E) C.W. &W.W. Blocks* 1 4-3 -2-1 1801 1727.23 l8Ox8o5 504.90 2232.13 Joe S. Simon (E) C.W &W.W. Blocks* 1 4 50' 479.79 50x9.5 156.75 636.54 C. E. Russell, Jr. (W) C.W. &W.W. Blocks* 1 3 501 479.79 5Ox9.5 156.75 636.54 Rays Simon (W) C.W. &W.W. Blocks* 1 2 50T 479.79 50x9.5 156.75 636.54 San Antonio Machine & Supply Co. (W) C.W.&W.W. Blocks* 1 1 501 479.79 479.79 *Central Wharf and Warelhouse Water Block Public Works Dept., Corpus Christi, Texas Engineering Division Compiled Checked Sheet 7 Final PAVING ASSESSMENT Water Street fromN. Pr. Line Fitztrerald St. to So Pr. Line Furman Ave. Pavement Gravel Concrete Base 1P Hot Mix Surface M & J Construction Co., Beeville, Texas Contractor Contract Date January 28, 1949 60.00 Ft.. Roadway Curb cost per lineal foot 0070 9.59572146 Paving rate per front foot Sidewalk cost per sq. foot 0.33 Sidewalk rate per front foot Property Owner Name of Addition Block Number Lot Number Property Frontage Paving Cost Sidewalk lwzr. Sidewalk Cost C.rb6ZM"r Lin. Ft Curb & GEM Cost Total Amount COOa R ALLEY TNrERSECTION Tex-Mex. R.H. Co. (E) .W.&W.W. Blocks* 2 7-6 -5-4- 1`1 2«1 375.78 3605,88 375.7 1178,07 225,T, 158,11 4942.06 City of Corpus Christi (W) ' " "Beach Portion 2 7^6- 5-4-3 2 -1 372.21 3571.52 372.2x9,5 1166.85 336.1 235.27 4973.64 KINNlY STREET INTERSECTION LaMesa Land & Cattle Co.(E) W. & W.W.Block- 3 NE 1001 of 3 -2 1001 959.57 20x9.51 62.70 1001 70.00 1092.27 LaMesa Land & Cattle Co.(E) J.W. & W.W.Beaoh''Po ion 3 SE 75.141 Of 1 75.14 721002 '&UPt9 5 235.56 75.11 52,60 1009018 H.C. Salter and wife, Dolly Salter (E) iarney Tract 7 89.161 855.55 8936x9.9 279.52 89.11 62.41 1197.48 J.C. Blacknall Co. (E) qarney Tract N of 6 55.68 534.29 55:68x95 174,55 55.64 38.97 747.81 J. C. Blacknall Co. (E) arney Tract S of 6 55.68 534.29 55.68x9.5 174.55 55.61 38.97 747,31 J. C. Blacknall Co. (E) 3orn Investment Co. chatzell Tract NE Portion 166.79 1600947 lkb Tx9.5 522.88 1,36.7 95.75 2219.10 Ruth Sparks (W) .W. &W Beach Portio 3 4 -3^2 ^1 2001 1919.14 200x9o5 627.00 200,0 140,00 2686.71 Roy V. Olsen (W) it it it If 3 So Lot 7.45 71.48 7.45x9, 23.'5 7.4 5.22 1OOo05 :. McGinness (W) iarney Tract 5•-4 801 767.66 80x9.5 250,$0 8000 566 1074.46 E.L. & J. L. Flint (W) rney Tract 3 401 383.83 40x9.5 125,40 40. 28.00 537.23 N. W. Gulley (W) m ey Tract 2-1 801 767.66 80x9.5 250.80 SO. 56.00 1074,4,6 Gulf Chevrolet Co. (W) orn Investment Coo rchatzell Tract N.V.Porticr. 166.47 1600.47 167.794 526.02 2126.49 *Central Wharf and Warehou Water Block Public Works Dept., Corpus Christi, Texas Engineering Division Compiled Checked Sheet 8 Water Street Final PAVING ASSESSMENT from N. Pr. Line Fitzgerald St, to S. Pr. Line Furman Ave, Pavement Gravel Concrete Base 13s Hot Mix Surface M & J Construction Company,Beeville, Texas Contractor Contract Date January 28, 1949 60,00 Ft.. Roadway Curb cost per lineal foot (),7n 9.59572146 Paving rate per front foot Sidewalk cost per sq. foot 0.33 Sidewalk rate per front foot Property Owner Name of Addition Block Number Lot Number Property Frontage Paving Cost Sidewalk t jor$'t. Sidewalk Cost C.,b COSM& Lin. Ft, Curb E G%R&KCost Total Amount O O BORN AVENUE INIERSECTICN Goad Motor Co. (E) Born Investment 166.794 1600.47 66.798.5 467.84 166.79 116.75 2185.06 Schatzell Tract E. center Port Gillespie Buick Co, (W) +t '+ SW Portiot 166.791 1600.47 1600,47 First Presbyterian Church($ " !' SE Portioi 94.901 910.63 4.90x9. 297.51 94.90 66.43 1274457 S. Kendall Trustee , (W) Broadway Courts 2 1 105.281 1010,24 05 28x8 295.31 105.28 73.70 1379.25 BROA AY COURT INTEMMR OTION Pittsburgh Pipe &Supply( 'E) Born Investment Schatzell Tract 92.901 891444 92.90x4 122.63 92.90 65.03 1079.1( Alfred Dorsogna (E) Schatzell Tract 146.801 1408.65 1.46.80X4 193.78 146.80 102.76 1705.15 B.P.O.E. Lodge,1628 (W) Broadway Courts 3 3:+2«+1 105,28' 1010,23 05.28x4 138.97 105.28 73.70 1222.9( Dave Zweig (W) Schatzell Tract 146.791 1408.56 L46.79x4 193.76 146.80 102,76 1705.0E Alfred Dorsogna (E) Rayne Tract 84.911 814477 84,91x4 122,08 84o91 59.44 986.25 Dave Zweig (E Rayne Tract 157.381 1510.17 L57.38x4 207.74 157.38 110917 1828.0E L.S. Reed Trustee (E) Rayne Tract 156.441 1501.15 L56.44x4 206.50 156.44 109.51 1817.16 Maud H. Miller (E) Rayne Tract 80.42t 771.69 80.42x4 103.51 80042 56.29 931.45 Helen H. Pease (E) Rayne Tract 86.29( 828.01 86.29x4 113.90 86,29 60,40 1002.31 Julia E, Caldwell & Mattis Caldwell Rhea (E) Rayne Tract 83.23 798.65 83.23x4 109.86 83.23 58.26 966.77 Sarah C. Caldwell (E) Rayne Tract 83,161 79708 83.76x4 109.77 83.16 58.21 965.96 H. G. Heaney (E) Rayne Tract 83.091 797.31 83,09x4 109.67 83.09 58.16 965.14 Alfred Dorsogna (W) Rayne Tract 84.971 815.35 84.97x4 112.16 84.97 59948 986.99 Dave Zweig (W) Rayne Tract 148,364 1423.62 8,36x4 195.84 148.36 103.85 1723.31 Corpus Christi Civic Center (W) ayne Tract 166.89t 1601.43 L66.89x4 220.29 166.89 116.82 1938.54 Church of Good Shepherd(W) Rayne Tract 80.42. 771.69 80,42x4 106.15 80.42 56.29 934.13 Helen Heard Pease (W) Rayne Tract 85.011 815.73 85.01x4 112.21 85.01 59.51 987.45 Julia E. Caldwell & Mattie Caldwell Rhea (W) Rayne Tract 82.831 794.82 32.83x4 109.33 82.83 57.98 962.13 Sarah C. Caldwell (W) Rayne Tract 82.52? 791,84 82.52x4 108.93 82.521 57.76 958.53 Public Works Dept., Corpus Christi, Texas Engineering Division Compiled Checked Sheet 9 Final PAVING ASSESSMENT Water Street from N, Pr, Line Fitzgerald St, to S. Pr, Line Furman Ave, Pavement Gravel Concrete Base 1i" Hot Mix Surface M & J Construction Company, Beeville, Texas Contractor Contract Date January 28, 1949 60.00 Ft.. Roadway Curb cost per lineal foot 0,70 9.59572146 Paving rate per front foot Sidewalk cost per sq. foot 003 Sidewalk rate per front foot Property Owner Name of Addition Block Number Lot Number Property Frontage Paving Coat Sidewalk 2725 Sidewalk Cost C.'6&23L X Lin. Ft. Curb7& most Total Amount H. G. Heaney (W) Rayne Tract 82.451 791,17 82.145x4 108,83 82945 57971 957.71 Velma Walker (E) Rayne Tract 102061 987.02 1.02.86X4 135.78 102.86 72.00 1194.80 Velma Walker (W) Rayne Tract 102.23' 980,97 1.02.23X4 134.94 102.23 71956 1187.47 I. W. Shaeffer, Truetee(E) Merriman Tract 53.081 509.34 53.08x4 70.07 53.08r 37.16 616,57 L. S. Reed, Trustee (E) Merriman Tract 73.11' 701954 73.11x4 96,51 73.11. 51.18 849,23 Burton Dunr, (E) Merriman Tract 74.0061 710.14 74.006 97.69 74.006 51.80 859.63 Est. S. Gugenheim & Lila Belle Gugenheim (E) Merriman Tract 124.281 1192.56 L24.28x4 164.05 124.28 87.00 1443.61 E. E. Bobys (W) Merriman Tract 53.081 509.34 53.08x4 70,07 53.08 37.16 616.57 Ben L. Anderson, & Athol W. Anderson Graham(W) Merriman Tract 75.111 720.73 75.11X4 99.15 75.11 52.58 872.46 Burton Dunn (W) Merriman Tract 72.63' 696.93 72.63x4 95.87 72.63 50.84 843.64 Est. Lila Belle & S. Gugenheim (W) Merriman Tract 144.21 1383.70 .2x4 190.31E 144.2 10004 1674.98 tale 1 ,052.911134,371,9 19,735a42 ­3,555.67 157,663. Cost to City of Corpus Chri ti as a property owner $ 10, 731. Cost to all other property twners 146,931.1)4 Cost to City of Corpus Christi for Pavement participation & drainage 79,233o"7 Total Contract Price 7 T236,896. Total Cost to the City of Corpus Christi 96 89,964. Public Works Dept., Corpus Christi, Texas Engineering Division Compiled Checked SECTION 2. The necessity for amending said Ordinance No. 2540 in order to show the correct property owners abutting upon Water Street within the limits above defined, and in order to properly levy assessments concerning same, creates a public emergency and an imperative public necessity, requiring the suspension of the Charter Rule, that no ordinance or resolution shall be passed finally on the date of its introduction, and that said ordinance shall be read at three several meetings of the City Council, and the Mayor having declared that such emergency and imperative public necessity exists, and having requested that the Charter Rule be suspended and that this ordinance be passed finally on the date of its introduction and that this ordinance take effect and be in Rill force and effect from and after its passage, IT IS ACCCHDINGLY 90 CRIAINED, PASSED AND APPROVED this the 1W-9 day of April, A. D. 1950. a\` MAYOR City of Corpus Christi, Texas APPROVED AS TO LEGAL FORM: ty Attor y Corpus Christi, Texas April ) V , 1950 TO THE IEMMRS OF THE CITY COUNCIL Corpus Christi, Texas Gentlemen: For the reasons set forth in the emergency clause of the foregoing ordinance, a public emergency and imperative necessity exist for the suspension of the Charter Rule or requirement that nocrdinance or resolution shall be passed finally on the date it is introduced, and that such ordinance or resolution shall be read at three meetings of the City Council; I, therefore, hereby request that you suspend said Charter rule or requirement and pass this ordinance finally on the date it is introduced, or at the present meeting of the City Council. Respectfully, OR City of Corpus Christi, Texas The Charter rule was suspended by the following vote: Leslie Wasserman Jack DeForrest Barney Cottay Sydney E. Herndon George L. Lowman °UL►lA a"'� The above ordinance was passed by the following vote: Leslie Wasserman Jack DeForrest Barney Cott Sydney E. Herndon George L. Lowman 1111A, 2-75,5-