HomeMy WebLinkAbout02765 ORD - 05/02/19505/l'56 (r,
j
ORDINANCE
APRI=IATING FRO FOLD NS. 293
Tf, CORPUS CTERT2TI:7TEHTOR7S CON-
TRUCTION ITT TR7 AMOUNT OF OM THOUS-
AND DOLLARD (.,:ai000) FOR 7TAT2R IypnovE-
112NT RROjECT YO. 207 CO:77171G I7S=LA-
IICil OF All TIFING NECESSARY TO 7.,■71,7,x7
nv77D zmom.E TANK ACID OM
THOUSAND ELM HUNDRED DOLT .s (S1,300)
FOR 11:T77 TE:117.017:1= PR0,TE72 70. 203
007:2IIII IHSTAILdT/1-7 or ALL I'LTING N7C7S-
2A11Y TO COD= 00011311: ROAD OTZRII7AD
1TO131RE TAI77; AUTHORIZING 21:2 DIRECTOR
ZUIZIC MPIES TO F20137ED ITITITUUCH IE3030T12-
1ZETS, 111:02 3013R TO 30 DORD BY CITY PORCS;
AND DECLARIIIG A:11 7VERGE7:ECY.
WHEREAS, There is needed approxiratoly Two Thousand
Eleht Lundred Dollars (2180O)for cost of ins:.;allation of all
piping necessary tc connect the Alameda and the Gollibar Road
Storage Tanks and for additional 1:12e necessary to such in-
stallatian;
777:s, T30 2_f.noval rf said rro.,foots has been secured
Crom andEansea, Consultiug EnL,-Incers for the boadine
C,T:11.79. ryy ; ana
130 3"102J There are safficisnt funls available for ouch
:,stallation cost in Fund No. 298 City of Corrus Christi 'later-
ricrL,s Construction; aad
7777R,i13, It Is contemplated thnt said work will be done
13.- City forces;
II$T TE2E707E, DE IT ORDAINED 7. THE. CITY COUNCIL 07 T77
CTrY OF CORPUS CHRISTI TRTdZ:
3=07 I. There is eiroLv arropriated the sum of
Two Thousand Riedlt Hundred Dollars (2,300) frr.m Turd 7o. 298
City of Corpus Christi Zraterworks Construction, out of which
thero is to Le raid ilia estimated coot of installation, One
Thousand 1:13 lars (:1,000), :including the additional yd.pe neces-
sary to ouch installation, of all piping necessary to connect
h rewly-built overhead stara,:;a look at Alasireda arte, and
ti,eoo for no estimated cost of installation of all piping
accessary to connect the newly built overhead storae tank on
Rollihar Road; al-A,,kohed ore EstImat*s of Cost of said Enstall
tion, being Water improversmn'o Projtots Nos. 207 and 200, which
are -made a part hereof.
szcTior II. The Director of 1,:lblic CTorks of the City of
Corpus Christi is hr,rtty directed to proceed 7aoith the work
descred in. Section I hercof to he cdnle by Oily Forces.
SESTICU III. The fact that it is necessary to rake such
opfroj2riation as ahcs7e s t out in ordor that these two new wules-
Ins he
may to connected to the water su3A2ly system so as to re-
lieve the existing conditions and to provide adequate facilities
c ;;:notect the health and zeneral welfare of the peoples of
the City of Corpus Christi oreates a public emt,rv,sloy P11.1 ion-
L° ratille public necessity recuiring Too susonsisn of the Chnrter
rule that no ordinance or resolutim shell Le :sassed finally
on the deto it in introduced and that such ordinance or resolu-
tion shall he read at three several meetings of the City Counoll,
and the laver, having doolnredthat such emergency and necessity
exist, requesting that said Charter rule he susl-,onded and that
this .ordinance be tossed finally sn the day it 1.s introduced
and into efil0c1; an-i . be in full force and effect fron and after
its passage, IT TO LCCORDINGLY SO MDATIa).
DASSD ArdaGTED, This the day of 1950.
Ci.eue2-4-CA-
=OR
The City or Cur-xis Christi, Tt,xas
Ari.aurED TO 17.W,..L FORM:
Corpus Christi, Texas
1949
TO THE MEMBERS OF THE CITY COUNCIL
Corpus Christi, Texas
Gentlemen:
For the reasons set forth in the emergency clause of the fore-
going ordinance, a public emergency and imperative necessity exist for
the suspension of the Charter rule or requirement that no ordinance or
resolution shall be passed finally on the date it is introduced, and
that such ordinance or resolution shall be read at three meetings of the
City Council; I, therefore, hereby request that you suspend said Charter
rule or requirement and pass this ordinanoe finally on the date it is
introduced, or at the present meeting of the City Council.
City of Corpus Christi, Texas
The Charter rule was suspended by the following vote:
Leslie Wasserman
Jack DeForrest
Barney Cott
Sydney E. Herndon
George L. Lowman
The above ordinance was passed by the following vote:
Leslie Wasserman
Jack DeForrest
Barney Cott
Sydney E. Herndon
George L. Lowman
1949
I certify to the City Council that the money required
for the contract, agreement, obligation, or expenditure contemplated
in the above and foregoing Ordinance is in the Treasury of the City
of Corpus Christi to the credit of Fund No, 49 (', f i/ p f ('
Z`
( ,,,.gf_from which it is proposed to be drawn,
• .' 77
and such money is not appropriated for any other purpose.
joppr
Director of Finance
Water.
WORK ORDER COVER SR ET
PROPOSED UTILITY CONSTRUCTION
To: The following addressees in turn -
Project No. 207. Alameda 'verhead Storage Tank.
Handled by
/, 1. Director of Public Utilities
2. Director of Public Works (See Sec. 3)
•3. City Controller (See Sec. .4)
'4. City Attorney (See Sec. 5)
5 City Manager (See Sec. 6)
FOR INFORMATION
6. Purchasing Agent
. Director of Public Utilities
FOR ACTION
S. Division Supt.
It is requested that each addressee take prompt action to complete.
the necessary work of his respective department as indicated on
attached Work Order Form and forward this corr :.spondence to the
next addressee.
Date Ic Date Out
£1- 0° J
This method of presentation is intended to systematize and standar-
dize procedures incident to construction of Utility installations;
to provide you with information essential to your operations, and
to insu,•e expedited and conoister_t handling of approvals for such
construction.
Division Supt.
PROPOSED PROJECT FOR
WORK ORD IR
WATER (X) NEW CONSTRUCTION (X)
GAS ( )
SEWER ( ) MAINTENANCE ( )
Sec. 1 - Project 1Fo.pn7 Location Alameda Overhead Storage Tank.
From Street to Street
Sketch Attached ( ) Estimated cost $ 6194.91
City Work ( ) Contract ( )
Remarks: See rttached.
i
Sec. 2. - Approved App ' , ,L6�� y'Git�U--�
Divis.':on Supt. Director of'Public Utilities
Sec. 3 - Plans prepared if necessary ( ) Design approved ( ) Project approved ( )
rReturn_ed for adjustment
( )
Remarks:
Chief Engineering Dept.
'rector of Public Works
Sec. 4 - Sufficient funds are (prat) available in the appropriate fund account,
exclusive of previous projects approved by the City Controller, to defray
cost shown herein to be allotted (See Sec. 1).
Remarks:
City Controller
Sec. 5 Legal requirements for work to be accomplished under this order have (have
not ) been met. Authorization can (can not) be granted by the City
Manager (City Council). Necessary legal documents, if any, are appended
hereto for completion.
Remarks:
City Attorney
Sec. 6 - This project has been approved and funds allotted for it in the amount
of the estimated cost (See Sec. 1). Authority is granted for construc-
tion proposed herein. Council action, if any, in connection with this
project is contained in Minutes of the Council dated
City Mnmgor
PROJECT NO. 20 7
ESTIMATE OF COST
LOCATION Alameda Overhead Storage Tank
QUANTITY
SIZE
DESCRIPTION
MATERIAL
INSTALLATION
MATERIAL &
INSTALLATION
UNIT COST
TOTAL COST
UNIT COST
TOTAL COST
•
• ••
••
S
M -.h 1 :th Bends
229 16
1
ire
Mech. Sleeve
71.20
71.20
IIMIline
1 1
=
' - '_.
Me h. Jt Pi •
13.•5
9.60
156.6•
4147.20
MIMMIIIM
.•I
•
1
sal
MI
w-RIEWMUMINIEN=MINI
TOTAL COST MATERIAL
5694.91
TOTAL INSTALLATION COST
Rn0 _nn
TOTAL COST MATERIAL & INSTALLATION
6494.91
JUSTIFICATION ; This project covers installation of all piping(.feed line, drain line, over-
flow line) necessary to connect the newly -built over head storage tank on
Alameda St.
PROJECT 207
PROPOSED LINES - - - -
EX/STING LINES
SCALE / /0O'
A L AMEDA ST
60'
I
W O R K O R D E R C O V E R S H E E T
PROPOSED UTILITY CONSTRUCTION
To: The following addressees in turn -
Water
Project No.2Q8.
Gollihar Overh.ae,9 Storaee Tank.
Tia.Le
in Date Out
Handled byj
7'1, Director of Public Utilities
2. Director of Public Works (See Sec. 3)
• 3. City Controller (See Sec. 4)
4. City Attorney (See Sec. 5)
5 City Manager (See Sec. 6)
FOR INFOR^ATION
6. Purchasing Agent
7. Director of Public Utilities
FOR ACTION
v=t -f`0 J=
1
8. Division Supt.
It is requested that each addressee take prompt action to complete.
tha necessary work of his respective department as indicated on
attached Work Order Form and forward this correspondence to the
next addressee.
This method of presentation is intended to systematize and standar-
dize procedures incident to construction of Utility installations;
to provide you with information essential to your operations, and
to insure expedited ane ronsi,ster_t handling of approvals for such
construction.
Division Supt.
PROPOSED PROJECT FOR
W O R K O R D E R
WATER (X)
GAS ( )
SE TER ( )
NEW CONSTRUCTION (X)
MAINTENANCE ( )
Sec. 1 - Project No. X06 Location Got
From Street to
'Sketch Attached ( ) Estimated cost $ 12,506.46
City Work ( ) Contract ( )
Remarks: gee Attached.
Street
Tank.
Sec. 2. - Approved ApprOm
Division Supt. Director of Public Utilities
Sec. 3 ,,Plans prepared if necessary ( ) Design approved ( ) Project approved ( )
Returned for adjustment ( )
Remarks:
Chief Engineering Dept.
beet r 1of Public Works
Sec. 4 - Sufficient funds are (aatemcIVIsi available in the appropriate fund account,
exclusive of previous projects approved by the City Controller, to defray
cost shown herein to be allotted (See Sec. 1).
Remarks:
City Controller it-
Sec. 5 - Legal requirements for work to be accomplished under this order have (have
not ) been met. Authorization can (can not) be granted by the City
Manager (City Council). Necessary legal documents, if any, are appended
hereto for completion.
Remarks:
City Attorney
Sec. 6 - This project has been approved and funds allotted for it in the amount
of the estimated cost (See Sec. 1). Authority is granted for construc-
tion proposed herein. Council action, if any, in connection with this
project is contained in Minutes of the Council dated
City Manager
PROTECT NO. 208.
ESTIMATE OF COST
LOCATION Gollihar Overhead Storage Tank
QUANTITY
SIZE
DESCRIPTION
MATERIAL
INSTALLATION
MATERIAL &
INSTALLATION
UNIT COST
TOTAL COST
UNIT COST
TOTAL COST
1
30"
Flanged 1 /8th Bend
274.80
274.80
1
30"
Lech Jt. 1 8th B -nd
:•
:•
1
30"
®®
1
30"
Mech. Sleeve
222.90
2 ?2.90
• ••
r- .
1
Me h J R -d , ,"
B.11 -.. ••" s.'•o
•'
•]Y
Pi.. 1 n•ed .n both -rids
lsUIIUIFf1!iiLi
16'
30"
Flange & Spigot Pipe
18.40
294.40
224'
30"
Mech. Jt. Pipe
12.69
2842.56
528'
24"
Lech Jt Pipe
9 60
5068.80
• -
W- . w+
• :
•
1
10"
Lech. Jt. 1 /16th Bend
25.40
25.40
256' TOTAL cosR'MATEAi• Jt. Pipe
2.67
683.52
TOTAL INSTALLATION COST
1070.6 ...45
.z•• S •
TOTAL COST MATERIAL & INSTALLATION
$12 , 506 •4
IUSTIFICATION7 This project covers installation of all piping (feed line,drain line,overhead
line)necessary to connect the newly -built overhead storage tank on Gollihar Road.
or
PROPOSED LINES - ---
EXISTING LINES
SCALE /'"_ /00'
drain
24
GO! L /1 /AR RO