Loading...
HomeMy WebLinkAbout02765 ORD - 05/02/19505/l'56 (r, j ORDINANCE APRI=IATING FRO FOLD NS. 293 Tf, CORPUS CTERT2TI:7TEHTOR7S CON- TRUCTION ITT TR7 AMOUNT OF OM THOUS- AND DOLLARD (.,:ai000) FOR 7TAT2R IypnovE- 112NT RROjECT YO. 207 CO:77171G I7S=LA- IICil OF All TIFING NECESSARY TO 7.,■71,7,x7 nv77D zmom.E TANK ACID OM THOUSAND ELM HUNDRED DOLT .s (S1,300) FOR 11:T77 TE:117.017:1= PR0,TE72 70. 203 007:2IIII IHSTAILdT/1-7 or ALL I'LTING N7C7S- 2A11Y TO COD= 00011311: ROAD OTZRII7AD 1TO131RE TAI77; AUTHORIZING 21:2 DIRECTOR ZUIZIC MPIES TO F20137ED ITITITUUCH IE3030T12- 1ZETS, 111:02 3013R TO 30 DORD BY CITY PORCS; AND DECLARIIIG A:11 7VERGE7:ECY. WHEREAS, There is needed approxiratoly Two Thousand Eleht Lundred Dollars (2180O)for cost of ins:.;allation of all piping necessary tc connect the Alameda and the Gollibar Road Storage Tanks and for additional 1:12e necessary to such in- stallatian; 777:s, T30 2_f.noval rf said rro.,foots has been secured Crom andEansea, Consultiug EnL,-Incers for the boadine C,T:11.79. ryy ; ana 130 3"102J There are safficisnt funls available for ouch :,stallation cost in Fund No. 298 City of Corrus Christi 'later- ricrL,s Construction; aad 7777R,i13, It Is contemplated thnt said work will be done 13.- City forces; II$T TE2E707E, DE IT ORDAINED 7. THE. CITY COUNCIL 07 T77 CTrY OF CORPUS CHRISTI TRTdZ: 3=07 I. There is eiroLv arropriated the sum of Two Thousand Riedlt Hundred Dollars (2,300) frr.m Turd 7o. 298 City of Corpus Christi Zraterworks Construction, out of which thero is to Le raid ilia estimated coot of installation, One Thousand 1:13 lars (:1,000), :including the additional yd.pe neces- sary to ouch installation, of all piping necessary to connect h rewly-built overhead stara,:;a look at Alasireda arte, and ti,eoo for no estimated cost of installation of all piping accessary to connect the newly built overhead storae tank on Rollihar Road; al-A,,kohed ore EstImat*s of Cost of said Enstall tion, being Water improversmn'o Projtots Nos. 207 and 200, which are -made a part hereof. szcTior II. The Director of 1,:lblic CTorks of the City of Corpus Christi is hr,rtty directed to proceed 7aoith the work descred in. Section I hercof to he cdnle by Oily Forces. SESTICU III. The fact that it is necessary to rake such opfroj2riation as ahcs7e s t out in ordor that these two new wules- Ins he may to connected to the water su3A2ly system so as to re- lieve the existing conditions and to provide adequate facilities c ;;:notect the health and zeneral welfare of the peoples of the City of Corpus Christi oreates a public emt,rv,sloy P11.1 ion- L° ratille public necessity recuiring Too susonsisn of the Chnrter rule that no ordinance or resolutim shell Le :sassed finally on the deto it in introduced and that such ordinance or resolu- tion shall he read at three several meetings of the City Counoll, and the laver, having doolnredthat such emergency and necessity exist, requesting that said Charter rule he susl-,onded and that this .ordinance be tossed finally sn the day it 1.s introduced and into efil0c1; an-i . be in full force and effect fron and after its passage, IT TO LCCORDINGLY SO MDATIa). DASSD ArdaGTED, This the day of 1950. Ci.eue2-4-CA- =OR The City or Cur-xis Christi, Tt,xas Ari.aurED TO 17.W,..L FORM: Corpus Christi, Texas 1949 TO THE MEMBERS OF THE CITY COUNCIL Corpus Christi, Texas Gentlemen: For the reasons set forth in the emergency clause of the fore- going ordinance, a public emergency and imperative necessity exist for the suspension of the Charter rule or requirement that no ordinance or resolution shall be passed finally on the date it is introduced, and that such ordinance or resolution shall be read at three meetings of the City Council; I, therefore, hereby request that you suspend said Charter rule or requirement and pass this ordinanoe finally on the date it is introduced, or at the present meeting of the City Council. City of Corpus Christi, Texas The Charter rule was suspended by the following vote: Leslie Wasserman Jack DeForrest Barney Cott Sydney E. Herndon George L. Lowman The above ordinance was passed by the following vote: Leslie Wasserman Jack DeForrest Barney Cott Sydney E. Herndon George L. Lowman 1949 I certify to the City Council that the money required for the contract, agreement, obligation, or expenditure contemplated in the above and foregoing Ordinance is in the Treasury of the City of Corpus Christi to the credit of Fund No, 49 (', f i/ p f (' Z` ( ,,,.gf_from which it is proposed to be drawn, • .' 77 and such money is not appropriated for any other purpose. joppr Director of Finance Water. WORK ORDER COVER SR ET PROPOSED UTILITY CONSTRUCTION To: The following addressees in turn - Project No. 207. Alameda 'verhead Storage Tank. Handled by /, 1. Director of Public Utilities 2. Director of Public Works (See Sec. 3) •3. City Controller (See Sec. .4) '4. City Attorney (See Sec. 5) 5 City Manager (See Sec. 6) FOR INFORMATION 6. Purchasing Agent . Director of Public Utilities FOR ACTION S. Division Supt. It is requested that each addressee take prompt action to complete. the necessary work of his respective department as indicated on attached Work Order Form and forward this corr :.spondence to the next addressee. Date Ic Date Out £1- 0° J This method of presentation is intended to systematize and standar- dize procedures incident to construction of Utility installations; to provide you with information essential to your operations, and to insu,•e expedited and conoister_t handling of approvals for such construction. Division Supt. PROPOSED PROJECT FOR WORK ORD IR WATER (X) NEW CONSTRUCTION (X) GAS ( ) SEWER ( ) MAINTENANCE ( ) Sec. 1 - Project 1Fo.pn7 Location Alameda Overhead Storage Tank. From Street to Street Sketch Attached ( ) Estimated cost $ 6194.91 City Work ( ) Contract ( ) Remarks: See rttached. i Sec. 2. - Approved App ' , ,L6�� y'Git�U--� Divis.':on Supt. Director of'Public Utilities Sec. 3 - Plans prepared if necessary ( ) Design approved ( ) Project approved ( ) rReturn_ed for adjustment ( ) Remarks: Chief Engineering Dept. 'rector of Public Works Sec. 4 - Sufficient funds are (prat) available in the appropriate fund account, exclusive of previous projects approved by the City Controller, to defray cost shown herein to be allotted (See Sec. 1). Remarks: City Controller Sec. 5 Legal requirements for work to be accomplished under this order have (have not ) been met. Authorization can (can not) be granted by the City Manager (City Council). Necessary legal documents, if any, are appended hereto for completion. Remarks: City Attorney Sec. 6 - This project has been approved and funds allotted for it in the amount of the estimated cost (See Sec. 1). Authority is granted for construc- tion proposed herein. Council action, if any, in connection with this project is contained in Minutes of the Council dated City Mnmgor PROJECT NO. 20 7 ESTIMATE OF COST LOCATION Alameda Overhead Storage Tank QUANTITY SIZE DESCRIPTION MATERIAL INSTALLATION MATERIAL & INSTALLATION UNIT COST TOTAL COST UNIT COST TOTAL COST • • •• •• S M -.h 1 :th Bends 229 16 1 ire Mech. Sleeve 71.20 71.20 IIMIline 1 1 = ' - '_. Me h. Jt Pi • 13.•5 9.60 156.6• 4147.20 MIMMIIIM .•I • 1 sal MI w-RIEWMUMINIEN=MINI TOTAL COST MATERIAL 5694.91 TOTAL INSTALLATION COST Rn0 _nn TOTAL COST MATERIAL & INSTALLATION 6494.91 JUSTIFICATION ; This project covers installation of all piping(.feed line, drain line, over- flow line) necessary to connect the newly -built over head storage tank on Alameda St. PROJECT 207 PROPOSED LINES - - - - EX/STING LINES SCALE / /0O' A L AMEDA ST 60' I W O R K O R D E R C O V E R S H E E T PROPOSED UTILITY CONSTRUCTION To: The following addressees in turn - Water Project No.2Q8. Gollihar Overh.ae,9 Storaee Tank. Tia.Le in Date Out Handled byj 7'1, Director of Public Utilities 2. Director of Public Works (See Sec. 3) • 3. City Controller (See Sec. 4) 4. City Attorney (See Sec. 5) 5 City Manager (See Sec. 6) FOR INFOR^ATION 6. Purchasing Agent 7. Director of Public Utilities FOR ACTION v=t -f`0 J= 1 8. Division Supt. It is requested that each addressee take prompt action to complete. tha necessary work of his respective department as indicated on attached Work Order Form and forward this correspondence to the next addressee. This method of presentation is intended to systematize and standar- dize procedures incident to construction of Utility installations; to provide you with information essential to your operations, and to insure expedited ane ronsi,ster_t handling of approvals for such construction. Division Supt. PROPOSED PROJECT FOR W O R K O R D E R WATER (X) GAS ( ) SE TER ( ) NEW CONSTRUCTION (X) MAINTENANCE ( ) Sec. 1 - Project No. X06 Location Got From Street to 'Sketch Attached ( ) Estimated cost $ 12,506.46 City Work ( ) Contract ( ) Remarks: gee Attached. Street Tank. Sec. 2. - Approved ApprOm Division Supt. Director of Public Utilities Sec. 3 ,,Plans prepared if necessary ( ) Design approved ( ) Project approved ( ) Returned for adjustment ( ) Remarks: Chief Engineering Dept. beet r 1of Public Works Sec. 4 - Sufficient funds are (aatemcIVIsi available in the appropriate fund account, exclusive of previous projects approved by the City Controller, to defray cost shown herein to be allotted (See Sec. 1). Remarks: City Controller it- Sec. 5 - Legal requirements for work to be accomplished under this order have (have not ) been met. Authorization can (can not) be granted by the City Manager (City Council). Necessary legal documents, if any, are appended hereto for completion. Remarks: City Attorney Sec. 6 - This project has been approved and funds allotted for it in the amount of the estimated cost (See Sec. 1). Authority is granted for construc- tion proposed herein. Council action, if any, in connection with this project is contained in Minutes of the Council dated City Manager PROTECT NO. 208. ESTIMATE OF COST LOCATION Gollihar Overhead Storage Tank QUANTITY SIZE DESCRIPTION MATERIAL INSTALLATION MATERIAL & INSTALLATION UNIT COST TOTAL COST UNIT COST TOTAL COST 1 30" Flanged 1 /8th Bend 274.80 274.80 1 30" Lech Jt. 1 8th B -nd :• :• 1 30" ®® 1 30" Mech. Sleeve 222.90 2 ?2.90 • •• r- . 1 Me h J R -d , ," B.11 -.. ••" s.'•o •' •]Y Pi.. 1 n•ed .n both -rids lsUIIUIFf1!iiLi 16' 30" Flange & Spigot Pipe 18.40 294.40 224' 30" Mech. Jt. Pipe 12.69 2842.56 528' 24" Lech Jt Pipe 9 60 5068.80 • - W- . w+ • : • 1 10" Lech. Jt. 1 /16th Bend 25.40 25.40 256' TOTAL cosR'MATEAi• Jt. Pipe 2.67 683.52 TOTAL INSTALLATION COST 1070.6 ...45 .z•• S • TOTAL COST MATERIAL & INSTALLATION $12 , 506 •4 IUSTIFICATION7 This project covers installation of all piping (feed line,drain line,overhead line)necessary to connect the newly -built overhead storage tank on Gollihar Road. or PROPOSED LINES - --- EXISTING LINES SCALE /'"_ /00' drain 24 GO! L /1 /AR RO