Loading...
HomeMy WebLinkAbout02802 ORD - 07/27/1950AN ORDNANCE APPROVING AND ADOPTING THE DIRECTOR OF PUBLIC WORM' WRITTEN STATEMENT AND REPORT OF THE ESTIMATES OF VARIOUS COSTS AND EXPENSES FOR THE IMPROVEMENT OF PORTIONS OF CERTAIN STREETS WITIft CERTAIN LIMITS AS DESCRIBED HERE- IN AND IN ORDINANCE NO. 2797 PASSED AND AP- PROVED ON THE 27tlZAY , ING THE NECES- SITY FOR SUCH 7 ROVEMENTS WITHIN THE CITY OF CORPUS CHRISTI, BY THE CONSTRUCTION OF SIDEWALKS; AND SETTING FORTH THE STATEMENT OF THE NAMES OF THE APPARENT OWNERS, DFSCRIPTICN, AND NUMBER OF FRONT FEET OF ABUTTING PROPERTY ON SAID STREETS WITHIN SAID LIMITS, AND OF ANY RAILWAYS, STREET RAILWAYS, AND INTERURBANS USING, OCCUPYING, OR CROSSING SAME; DETERMINING AND FIXING THE PORTION OF SAID COST AND THE RATE THEREOF TO BE PAID BY AND ASSESSED AGAINST SAID ABUTTING PROPERTY, SAID RAILWAYS, STREET RAILWAYS AND INTERURBANS AND TRUE OWNERS THEREOF AND THE PORTION THEREOF TO BE PAID By THE CITY OF CORPUS CHRISTI; AND DETERMINING THE NECESSITY OF LEVYING AN ASSESSMENT AGAINST SAID ABUTTING PROPERTY, ANY SAID RAIIr WAYS, STREET RAILWAYS AND INTERURBANS AND SHE REAL AND TRUE OWNERS THEREOF FOR THE PART OF SAID COST APPORTIONED TO THEM; ORDERING AND SETTING A HEARING AT 2s0 O'olook FM Oyu 'raa rd DAY OF August A.D. 1950, AT CHAMBER OF —MY �L PUS CHRISTI, TEXAS, AS THE TIME AND PLACE FOR A HEARING OF THE REAL AND TRUE OWNERS OF SAID ABUTTING PROPERTY, RAILWAYS, STREETS RknAAYS, INTERURBANS, AND ALA OTHER PARTIES INTERESTED IN SAID PROPERTY OR IN SAID PRO- CEEDINGS CONCERNING SAID ASSESSMENTS AND PROCEEDINGS; DI- RECTING THE CITY SECRETARY OF THE CITY OF CORPUS CHRISTI, TEXAS, TO GM NOTICE OF SAID HEARING AS REQUIRED BY THE LAWS CF THE. STATE OF TEXAS AND THE CHARTER OF THE CITY OF CORPUS CHRISTI; AND FURTHER DIRECTING THE SAID CITY SECRE- TARY, IN ADDITION TO THE NOTICE OF SAID MARINO AS REQUIRED BY LAW, WHICH SHALT, BE VALID AND SUFFICIENT IN ITSELF, TO INCLJDE THEREIN A LIST OF THE APPARENT OWNERS AND DESCRIP- TIONS OF SAID ABUTTING PROPERTY SET OUT IN SAID DIRECTOR OF PUBLIC WORKSI REPORT, AND PROVIDING THAT SAID LIST OF AP- PARENT OWNERS SHALL NOT BE CONCLUSIVE OF SAID OWNERSHIP, AND SHALL NOT LIMIT SAID NOTICE TO SUCH OWNERS NAMES, AND THAT SAID NOTICE SHALL NEVERTHELESS BE DIRECTED TO THE REAL AND TRUE OWNERS OF SAID ABUTTING PROPERTY, WHETHER NAMED OR CORt RECTLY NAMED OR NOT; AND DECLARING AN EMERGENCY. WHEREAS, The City Council of Corpus Christi, Texas, heretofore on the 27thday of June, 1950, by duly enacted Ordinance, determined the necessity for and ordered the improvements of certain portions of certain streets by the constructing of sidewalks along same, within certain limits as fully described in said ordinance in the manner and according to the plans and specifications heretofore approved and adopted by the City Coun- cil therefor, and a duly executed Notice of said ordinance having been filed in the name of said CiPwith the County Clerk of Nusess County, Texas, on the 27th day of June, A.D. 1950.; and WHEREAS, Said City Council of the City of Corpus Christi, hav ing advertised for and received bids on the construction of said improve- 2-3yb 2� went for the length of time and in the manner and form as required by the Charter of said City and the laws of the State of Texas, and also. having duly and regularly made appropriation of funds avail- able for such purpose to cover the estimated cost to said City of said improvements, all as provided by the Corpus Christi City Charter and by law, and having awarded a contract for the construction of said improvements to J. M. Dellinger, Inc. on its lowest and most advantageous bid and said contract having heretofore been duly execu- ted by said City of Corpus Christi, Texas, and J. M. Delli gerp Inc., and is dated June 27th, 1950, and the performance bond required by said contract having been properly furnished and posted by said J.M. Dellinger,,Inc. and accepted by said City Council of said City as to form and amount as required by the Charter of said City and the laws of the State of Texas; and WHEREAS, The said City Council has caused the said Director of Public Works to prepare and file estimates of the cost of such improvements and estimates of the amounts per front foot proposed to be assessed against the property abutting upon said streets to be improved and against any railways, street railways, and interur- bane using, occupying or crossing same, and the real and true owners thereof, and said Director of Public Works has heretofore filed said estimates and a statement of other matters relating thereto with said City Council, and the same have been received and examined by said City Council; and WHEREAS, In order to facilitate the commencement of the carr- struction of the improvements herein contemplated, and because Attie ownership of the various properties abutting upon the portions of streets designated and described in Ordinance Ho. 2797 , which declared the necessity for such improvements and which was Passed and approved on the 27th day of June, 1950, is presently avail. able, but that there may be delays in obtaining the ownership of the other abutting property owners along the other streets contemplated to be improved, it is deemed desirable by the City Council that the matters concerned in this ordinance shall concern only those certain Portions of those certain streets as described in this, ordinance; and WHEREAS, In accordance with said statement of estimates and other matters prepared and filed by said Director of Public Works which concern and are directed to those certain portions of those certain streets described in said Ordinance No. which are herein approved by said City Council, the.estimated total cost of the whole improvement on those portions of certain streets within the limits described in said Ordinance No. A-j9? is /8l, S -7A0 and the estimated amount per front foot proposed to be assessed against each abutting property and the real and true owner thereof for said sidewalks is per lineal foot; the total estimated amount per front foot proposed to be assessed against each abutting property and the real and true owner thereof is /9% (, /,7G) per lineal foot; the estimated total cost of said improvements to be paid by said abutting property and the real and true owner thereof is the amount of** the estimated total cost of said improve- ments to be constructed between rails, turnouts, and switches and two feet on each side thereof of any railways, street railway or interurban using, occupying, or crossing said streets proposed to be assessed against said railways, street railways or interurban and the real and true owners thereof isz� ; and the estimated total cost of said improvements to be paid by the City of Corpus Christi is QD•pc ; and WHEREAS, According to said written statement of said Director Of Public Works, the names of the apparrent owners of said abutting property and number of front feet owned by each, the description of their property, and the amount proposed to be assessed against each abutting property and the real and true owners thereof and other matters contained in said statement are as set forth therein, all Of which is incorporated herein and made a part hereof by reference and are on file in the office of the City Secretary of the City of Corpus Christi: NOW, THE -WORE, BE IT ORDAIN By THE CITy COUNCIL OF 1HE CITY OF CORPUS CHRISTI, TEXAS: R SECTION 1. That the written statement and report of the Director of Public Works, heretofore filed with the City Council, and showing the estimated total cost of the whole improvement of certain portions of those certain streets within certain limits as described in Ordinance No. ,0 2 5r 7 , passed on dune -27th, 1959,which declared the necessity for such improvements, are here- by accepted and approved, the estimated amount per front foot pro- posed to be assessed against the abutting property and the real and true owners thereof on said streets for construction of curbs; the estimated amount per front foot proposed to be assessed against said abutting property and the real and true owners thereof for said improvements exclusive of curbs; the total estimated amount per front foot proposed to be assessed against said abutting pro- perty and the real and true owners thereof; the total estimated cost of said improvements to be paid by the City of Corpus Christi, Texas; the names of the apparent owners of the property abutting on said streets within the limits above defined, with the number of front feet owned by each and the description of their property, having been received and examined by the City Council, said report is hereby in all things approved and adopted. SECTION 2. That it is hereby found and determined that the estimated total cost of the whole improvement on the portions of said streets within the limits of said description as set forth in said Ordinance No. , r� is � e l the estimated amount per front foot proposed to be assessed against each abutting property and the real and true owner thereof for said sidewalks is a 1-741 per lineal foot; the total estimated amount per front foot proposed to be assessed against each abut -. ting property and the real and true owner thereof if / %' per lineal foot; the estimated total cost of said improvements to be paid by said abutting property and the real and true owner thereof is a "'O, y :'d ; the estimated total cost of said improve- ments to be constructed between rails, turnouts, and switches and two feet on each side thereof of aqy railway, street railway or in, terurban using, occupying, or crossing said streets proposed to be assessed against said railways, street railways or interurban and the real and true owners thereof is \,- and the esti- mated total cost of said improvements to be paid by the City of Corpus Christi is 65 A �L fro X. e7 O ; SECTION 3. That the designation of various portion of cer- tain streets to be improved as a whole as set forth in said Ordin- ance No. a ;?f 7 shall not in any war prejudice the rights of the City to proceed with such improvements as to any street or streets, portion or portions thereof, or the rights of the City to proceed on the remaining streets or portions thereof whether said improve- ments are begun as a whole or as to amy street or streets, portion or portions thereof, and such shall not constitute any objection on the part of any individual nor property or shall not in any way invalidate or affect the assessment against the property or properties concerned with said improvements as a whole or any part or portion thereof, whether said improvements be begun at this time or here- after in accordance with this ordinance, nor shall such in any way affect or invalidate the assessment against any property which abuts the portion of any street or street to be improved in accordance With said Ordinance No•� 7 -y`% SECTION 4. "That the costs of said improvements shall be paid and assessed against theproperty abutting upon said streets within the limits above defined, and auy railways, street railways or interurban, using, occupying or crossing same, and against the real and true owners thereof in accordance with, and in the manner provided by the Charter of the City of Corpus Christi, Texas, and by the Acts of the 40th Legislature of the State of Texas, First Called Session, Chapter 106, and lmown and shown as Article 1105 —b of Vernon's Annotated Civil Statutes of Texas, and that a portion of the costs of said improvements shall be paid and defrayed by the City of Corpus Christi, Texas in accordance with Ordinance No._ 0? J f7 the laws of the State of Texas, and as stated above, and that the total cost of said improvements shall be and are hereby apportioned between said parties and shall be paid and defrayed as follows: (a) The cost of constructing,sidewa3lm within the area between and under rails, tracks, double tracks, turnouts, and switches, and two feet on each side thereof, of any railroad, street railroad, or interurban using, occupying or crossing such street or portion thereof hereby ordered improved, shall be paid by the respective owners thereof, and assessed against such railroad, street railroad, or in- terurban, and its road bed, ties, rails, fixtures, rights and franchises, and the real and true owners thereof, in the manner provided by the terms of the City Charter of the City of Corpus Christi, Texas, and by said Acts of the 40th Legislature of the State of Texas (1927) above identified. (b) The City of Corpus Christi will pay all engineering costs incurred in establishing the line and grade of all sidewalks to be constructed pursuant to this ordinance, and shall pay not more than the balance of the total remaining cost of such improve- meats over and above that amount assessed against the property abut- ting upon said streets within the limits as above defined, and the real and true owners thereof, The City shall also pay the cost of such improvements on corner lots between the intersection of easew ment lines and the curb to which they are immediately adjacent. The City as a property owner shall pay the cost of improvements for which it may be assessed by reason of City property abutting said improvements. (c) The property abutting upon said streets within the limits above defined and the real and true owners thereof, shall be assessed and pay not to exceed the total cost of constructing of the sidewalks along the portions of said streets to be improved, as described and designated in said Ordinance No. -7 7 9 7 ex- elusive of the amount thereof herein specified to be paid by any railway, street railway, or interurban, as set out in sub - section (a) above, and by the City of Corpus Christi as set out in sub-sec- tion (b) above. The amounts payable by the abutting property and the real and true owners thereof shall be assessed against such property and the real and true owners thereof and shall constitute a first and prior lien upon such abutting property and a personal liability of the real and true owners thereof, and shall be payable as follows, to -wits The amount of said assessments shall be payable in two equal installments, the first of which to be due and payable twenty days after the date said improvements are completed and accepted by the City Council of the City of Corpus Christi, Texas, and the re- maining one installment to be due and payable one year from and af- ter the date of such acceptance, together with interest thereon from said date of acceptance at the rate of five per cent (5 %) per annum payable on the date the said installment is due; provided, however, that the owner of said property shall have the privilege of paying any one or all of such installments at any time before maturity there- of, by paying the total amount of principal due, together with inter• estaccrued to date of payment; further, that if default be made in the payment of any said installment or principal or interest prompt- ly as it matures, then at the option of the contractor or assigns, the entire amount of the aasessment upon which such default is made, shall be and become immediately due and payable, together with Teasonable attorneys fees and collection costs, if incurred; however, it is speci- fically stipulated and provided that no assessment shall in any case be made against any property or the real and true owner thereof in ex- cess of the special benefits to accrue to such property in the en- hanced value thereof, resulting from such improvements. SECTION 5• That a hearing be given to the real and true owners and all owning or claiai g emy interest in any property abutting upon said portion of said streets as defined heretofore, and in any railway, street railway, or interurban occupying or crossing same, and to all , others owning, claiming or interested in said property, railway, street railways, or interarbans, or any of said matters as to the assessments and to the amount to be assessed against each parcel of property and, the real and true owners thereof, and as to the special benefits to said property to be received from said improvements, if any, or con- cerning any error, invalidity, irregularity or deficiency in any pro- ceedings or contract with reference thereto, or concerning any matter or thing connected therewith, which hearing shall be held by the City Council of said City in the Council Chamber of the City Hall in the City of Corpus Christi, Texas, at 'k o'clock P.M. onthe LLd day of A.D. 1950, at which time all persons, firms, corporations, or estates, owning or claiming any such abutting property, railways, street railways or interurban, or any intereft therein, and their agents or attorneys, or persons interested in said proceedings are notified to appear and to be heard in person or by counsel and may offer evidence, and said hearing shall be adjourned from dap to day and from time to time and kept open and reopened until all protests have been duly heard; and the City Secretary of the City of Corpus Christi, Texas, is hereby directed to give notice of said hearing by publication in the Corpus Christi Caller Times, the official news- paper of the City of Corpus Christi, which is a daily- newspaper of general circulation in the City of Corpus Christi, Texas, and said notice shall be published at least three times in said newspaper be- fore the date set for said hearing, the first of which publications shall be at least ten days prior to the date of said hearing, and such notice of publication shall be valid and sufficient without further form of notice, as provided for and in accordance with the terms and provisions of said City Charter and of Chapter 106 of the Acts of the First Called Session of the 40th Legislature of the State of Texas, known and shown as Article 3-105—b of Vernon's Anno- tated Civil Statutes of Texas, and said City Secretary is further directed, in addition to the notice of said hearing as required by law, which shall be for all purposes valid and sufficient in itself, to include therein the list of the names of the apparent owners of said abutting property as set out in said City Engineer's report, provided, however, the said list of apparent owners so included in said notice, shall merely be cumulative of and in addition to the requirements of said notice as provided by the laws of the Sta to of Texas, and the Charter of the City of Corpus Christi, Texas, and shall not in any manner be conclusive of the real and true owners of said abutting property nor limit s@Ad notice to such apparent owners named therein, but said notice shall nevertheless be direct- ed to the real and true owners of said abutting property, whether named or correctly named therein or not, and to all other claiming, owning, or interested in any manner in any of said abutting property on said streets within the limits described* SECTION 6. That following such hearing as above provided, assessments will be levied against said abutting property and the real and true owners thereof for that portion of the cost of said improvements determined to be payable by said abutting property and the real and true owners thereof as hereinabove set out, and shall be a first and prior lien Pon said abutting property. In levying said assessments, if the Ze of the owner be unknown, it shall be sufficient to so state the fact, and if said abutting property be owned by an estate or by any firm or corporation, it shall be sufw ficient to so state the fact, and it shall not be necessary to give the correct name of any such owner, and no error or mistake in at- tempting to name any such owner or in describing wW of said property shall invalidate any assessment or certificate issued in evidence thereof, but nevertheless the real and true owner of said abutting property shall be liable and the assessment against said property shall be valid whether or not such owner be named or correctly named. SECTION 7. The fact that portions of certain streets with- in the City of Corpus Christi, as above described, do not have side- walks, and the further fact that sidewalks along said streets are necessary to the health and public welfare of the inhabitants of said City because of the increased traffic along said streets, creates a public emergency and public imperative necessity requiring the sus- pension of the Charter rule that no ordinance or resolution shall be passed finally on the date it is introduced and that such ordinance or resolution shall be read at three several meetings of the City Council, and the Mayor, having declared such emergency and necessity to exist, requesting that such Charter rule be suspended, and that this ordinance be passed finally on the date of its introduction and take effect and be in full force and effect from and after its pas- sage, IT IS ACCORDLIGLY SO ORDAINED. PASSED AND APPROVED, This the day of June,1950. T: MAY The City of orpus CH s 3ecre ary APPROVED AS TO _LEGAL FORM: City Attorney Corpus Christi, Texas i , 1950 tl TO THE P.EMERa OF THE CITY COUNCIL Corpus Christi, Texas Gentlemen: For the reasons set forth in the emergency clause of the fore- going ordinance, a ,public emergency and imperative necessity exist for the suspension of the Charter rule or requirement that no ordinance or resolution shall be passed finally on the date it is introduced, and that such ordinance or resolution shall be read at three meetings of the City Council; I, therefore, hereby request that you suspend said Charter rule or requirement and pass this ordinance finally on the date it is introduced, or at the present meeting of the City Council, Respectfully, I�1YOP. City of Corpus Christi, Texas The Charter rule was suspended by the following vote: Leslie Wasserman Q�j_ Jack DeForrest Barney Cott Sydney E. Herndon �f�p George L. Lm'rman The above ordinance was passed by the fol— lowi°n-gg vote: Leslie 'Aasserniau Jaole DeForrest Barney Cott Sydney E. Herndon George L. Lowman agog July 6, 1950 TO: The Mayor and City Council FROM: H. H. Stirman, Director of Public Works Submitted herewith are sidewalk assessment sheets setting out the description of the property abutting on streets to be improved by the construction of sidewalks, together with names of the apparent real and true owners, number of front feet owned by each, and the amount proposed to be assessed against each abutting property, and the real and true owner thereof. The estimated total cost of the whole improvements is $181,570.80, exclusive of an estimated additional cost of $10,347.37 for City parkways and alleyways. The estimated amount per front foot proposed to be assessed against each abutting property and real and true owner thereof for sidewalks is $1.76 per lineal foot based on four (49 foot width. The estimated total cost of said improvements to be paid by said abutting property and real and true owners thereof is $181,570.80. The estimated total cost of said improvement to be constructed between rails, turnouts, and switches and two (2') on each side thereof of arjV railway, street railway or interurban using, occupying or crossing said streets proposed to be assessed against said railways, street railways, or interurbans and real and true owners thereof is NONE. The estimated total cost of said improvements to be paid by the City of Corpus Christi is $12,800.00. H. H. Stirman Director of Public works is APPROVED: W. Collier City Manager { cTnresATX JJM ASSESSMENT �..: :.0 Vr .,u . e e ,.. t r. , a. PAVEMENT CONTRACT DATE t CIAB CWT PER LINEAL FOOT - SIDEWALK COST PER S4. FOOT r i l CONTRACTOR T. ROADWAY PAVING RATE PER FRONT 7-FOOT BLOCK LOT 1676 used on 11I 1N1dth. SIDEWALK RATE PER FRONT FOOT • PROPERTY OWNER NAME OF ADDITION NUMBER UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT f'ROC TflR STRElET INTE R SE C TIOA Taylor Investment Co.( ) P. A. Cliffs 816 45-64 500.0 880000 e bhn H..11- I n (E) " 816 41 -44 100.P0 176.00 R 0 P E 8 '.T R I. E T I N T E R 11 E C T 1 0 N Dr. A. L. Shinn (E) *. H."D-3r, P. A. Cliffs " 815 62,64 100x0 176.00 .Tr.(E) 815 49,50 5O.o 88.00 Paul R. Danford (E) " 815 7,118 50.0 88.00 f. C. Danford (E) " 845 5,1+6 50.0 88.00 S INN C AIR ST I EET NTE S e.0 10 N lkwgaret E. Webster (S P. A. Cliffs 8111 9-64 150.0 2611.00 W. L. DaRoohe (S) " 8111 57,58 50.0 88.00 S. D. Sryder (E) " 8111 55,56 500 88.00 Gladys Downer (E) " 824 3,54 50.0 88000 Robt. E. Davidson (E) " 814 ,52 50,0 88.00 L. W. olive () " 814 9,5o 50.0 88,00 Nellie E. Beebe (E) " 814 5,116 50,0 88.00 Paul R. ROIL; (E) 814 ,41 5o.o 86.00 Albert H. lasses (E) " 8111 100.0 176,00 14TCwe1i P. Dams($) " 8111 15p 0 264.00 ROSE TIER 138 ST E$_ N E SEC I0N Edward R. BYebsrg,ar.( ) A. P. Cobb g 442-5 - ` - - 778.80 M I N N E S O T A _ T KZ T I N T E R S P C r I O N PIIw Ir eunorc ncor b•-To o42.5 b -Total 5911.80 'NGINEERING DIVISION IC.T. CR6 s-- 1 -- . �� - -- -- SIDLGPALK ASSESSMENT SOUTH ALA�'0 ^. STREET FROM MOTORSTRRET TO GLUEBROOK STREET PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER SQ. FOOT .44 CONTRACTOR FT. ROADWAY 1' 0 PAVING RATE PER FRONT �F.00T 4 1,76 Based on Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER - NAME OF ADDITION BLOCK NUMBER OT UMBER PROPERTY FRONTAGE AVINB COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT N I N N E 3 0 T A T R E E I N T E R S C T I 0 N Naas ?raw* (S) P. A. Cliffs 812 351,63 &,64 100,0 176.00 Mrs. Ruth Robarts(E) " 812 M163 62,61 750 132.00 1 ad W, Dawsm (E) " 812 58,59 III 7500 132600 Maas'y E. Edwards (E) " 812 g'60 75,56, 7 70.0 123.20 A. S. Scheffel (E) " 812 52,53, 4 75.0 132x,00 Chas, R. AWWA.ng(S) " 812 49,50, 75.0 132;x00 Carl R. K. Bimher (E) " 832 46,47, 75.0 132000 Mario B. son Blucher(& " 812 43,44, 75.0 73 2a00 060. A. 81aRsher (8) "- 812 40,41, 75.0 132.00 B. N. Comwd (E) " 812 33-39 175.0 30400 G L AL E B R O K S T R E E T I b T E R S E C T I C N Sub-Tot6l 870,,0 'imb-Totia 11,531,20 YUOL14 WuNKS UCY1., GURPUa GNR15T1, TEms ENGINEERING DIVISION COMPILED L.K.T. CHECKED X.L.K. XM INBaOTA SSW PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER SQ. FOOT' PAVING ASSESS^IENf SMA FE TO AUSM MR= FROM 1.76 based an 4' eidtb CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT 'FOOT IDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY I FRONTAGE PAVING COST SIDEWALK I L N. FT. SIDEWALK COST CURB LIN. FT. CUR B COST TOTAL AMOUNT SAN A YX ZAT Z R$s G T101 L B. Tbaapa0a ($ A. P. Cobb 1 316 2089 190.06 Irahie B. Rlwhart (8 * " " 2 230.881 406.35 LAY I V13V 3 T R MET 1 aTE ILICT ON Idea Crus ( ) " " 3 131.70' 231.79 L. s. Mikulee a 1211 212.96 A 0 S Z8 I T R 3 1 T I I IRa I C T 1 0 PUBLIC WO.- 30 2MAL $1,041.18 DEW., CORPUS CHRISTI, TEXAS so ill= 5n.56 ENGINEERING DIVISION COMPILED Lff CHECKED rR0 6/23/r^ 0. Or xe 3. A] III. R. B9 0. T. 0. Ir Ad W. H. J. PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT PAVING ASSESSMENT sYWnEV R4�Alri'y FROM CRJM=33 M CKAR CONTRACTOR FT, ROADWAY PAVING RATE PER FRONT ;FOOT 1_76 b, en r SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT I UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT, SIDEWALK COST CURB LINO FT, CU.iB COST TOTAL AMOUNT CHa 111 B 3 LIx S TR BET Ix I sass TIO L. � x83T BAYBx 8 r 8-9a fW i a " x i6. 1 .46.81 de.31 T. Hart ) a a r 8-7 6 63.6r 1]1.% on D. Cm�[ y1) a r r 46.8 82.Y road A. Carr W �y a a r 5 3 4 46.81 93.61 82,3 Tbos. Hrian r r a z 46.8 164.7.' ,ton T. caddis (w a R " 82.3E Dirook ( H. Coleman (w) a * r a a 9T8' 82.3E 88.0K ggio Gravyett (w) a a a 10-11 12 1001 50r 176.0C C. YA04Y (W a a a 13 50r 88.0 E. Spring " a " 711 521 88.00 92.5: BRS I Z W A A VENUE IRT RSB C rIOX S. Crook (W) REST HAVE (W) n z 521 91.52 blyn (w� r 3 92.52 dhiT1 J. (1Wf} R r " 4 -5 52r 1040 91.52 F. KoCartbV a a " 6 183.04 T. Bittnsr (w) " IT , 521 91.52 7 521 91.52 PUBLIC WORKS DEPT„ CORPUS CHRISTI. TFXAS SQB X1,860.67 ENGINEERING DIVISION SUB TOTAL — 1,057.2r COMPILED L" CHECKED /� SIDEWA" kMIKASSESSMENf 1AWWlE1 STRW FROM CHAIt MU AIH STRUT TO TEXAS AVEME PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER SQ. FOOT U CONTRACTOR FT, ROADWAY PAVING RATE PER FRONT FOOT 1.76 Based on 41 Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. S IDEWALK COST CURB LIN. FT. CUR B COST TOTAL 4MOUNT Chas. T. Rawalt Bst.(II Rest Haven 7 8 52.00 91.52 Frankie *Daniel (W) " " 7 9 52.0 91.52 H. 0. wernstte (W) " " 7 10 52.0 91.52 We. Fay McClure (R) ° " 7 U 52.0 91.52 Mrs. Loons Davis (w) ° " 7 12 52.0 92.52 N. L. Williams (2) ° 7 13 52.0 91.52 Rinnis Welborn (H) " ° 7 14 52.0 91 52 Lowell" Borden (d) " ° 7 15 & Sj 16 78.0 137.28 T 9 X A S A V 9 N U E I LATER 3 r.;GTI0N T r 1 ISub-TaLAI PUBLIC WORKS OEPf., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION "1 - COUPILEDL t T_ - CHECKED J_R.C. SIDEWALK ASSESSMENT TOPEKA sTRLET AND FROM HARRISON STREET TO WAS AVE= PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER S4. FOOT .44 FROM NINNESOTA STREET TO BLAZEHROOH 3TRBET CONTRACTOR FT. ROADWAY LIVING RATE PER FRONT :FOOT 1.76 $*@ad an 40 Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LINe FT, CURB COST TOTAL MOUNT SfI NNESO A S TxJtET - I Al lixSC TI O Clarencs A. Hertel (E) P. A. Cliffs 712 58-ft 238.0 Archie (E) " 712 384a 1111.0 HeB. rrin in (E)rt R. E. Harris {E) " 712 5,36, 7 57.0 204.511 Floyd B. Barkh+edt (Ts) " 712 33,311 58.0 102.08 0 L A 2. B B R 0 K I T R E E 7 I N r E R S f C T I_ 0 H A R F I S O q S 7 R_ E E r I N T - R S E T I O N John 9. Dye (W) P. A. Cliffs 808 l 6 150.0 Pearl �a(a) ) 7,8 5010 26.00 !1 Si, A. t Stone 808 88.00 J. 0. Clanton (a " 848 ,i4, 11,13 .0 50.0 132.00 G. B. Oierhart (w) R 75.0 88.00 Vern B. King (W) W. J. Holy (W) R R 808 ,15, 17,18 50.0 132.00 88.00 �. A. Martin (w) " 808 808 19,20 21,22 5o.0 50.00 88.44 rhelaa Landig, (W) " 808 23-26 100.0 88.00 r. V. Jones (W) " 808 27,28 50.0 176,00 H. Dunlap (A) � " 808 29,3o 50.0 88.00 W. Anderson " 808 31,32 50.0 88.00 88.00 Conti d Page) II W PUBLIC In novc A­ - Bub -.Tp - 71.267.o T O •.. ••v.n�r ��rl e, MRIU•: CHRIST!, TEXAS - � -- ENGINEERING DIVISION \\ C0MPILED WECHED -_ SID"ALi MAU ASSESSMENT TOPEKA STRYM FROM HWISON ST@ERT TO TEXAS AVENUE PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT 044 CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT :FOOT 1*76 Based on 4' Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER- NAME OF ADDITION BLOCK NUMBER OT UMBER PROPERTY FRONTAGE AVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT chess. V. 11crgan (g) P. A. Cliffs 708 63.64 5040 88,00 J. V. Dickerson (E) " 708 61,62 50.0 88,.00 Leon Solinger (B) " 708 59,60 50.0 88.00 L, M. Garrett (E) " 708 57,56 50.0 88.40 F. H. Crew (9) " 708 55,56 50.o 88.00 Nials Anderson (E) " 708 53,54 50.0 88000 P. V. Va }binder (E) " 708 51,52 50,0 wow X. L. Porter (E) " 708 48,54 50.0 88►c00 N. B. Walters (E) " 708 47,48 50.0 88.40 E. m. Howell (E) " 700 45,46 50.0 88.00 A. W. Haaon (E) " 708 43,44 50.,0 88.00 John C. Alvin (9) " 708 41,42 50.0 88.00' B. C..'Aildbarger.(E) " 708 39,40 50,0 88030 Joe bliss Crocker(E) " 708 37,38 50.0 88.70 Abe Lewis . (E) " 706 35,36 50,0 88,00 J..' L. Majullan (B) " 706 33 :34 50.0 88:40 TEXAS STkE T IN r ERSEGTI N b-To 800-0 1 Sb-Tt4 ,408.%W PUBLIC WORKS DEPT., CORPUS CHRISTI., TEXAS ENGINEERING DIVISION COMPILED L.K.T. CHECKED J.R.C. PAVEMENT CONTRACT DATE C w B COST PER LINEAL FOOT SIDEWALK COST PER S4. FOOT VINO ASSESS. ^.!ENT now= BLVD FROM SOUrMN $TAM TO S. STAPLES STRUT CONTRACTOR T. ROADWAY ING RATE PER FRONT (FOOT 1.76 basso on I.' width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT SOti N I R N 8TR 9 3T I 9TIR31CT 10 N rulas N. Sim= (Ii Del bier 37 32 135' 237.60 Ilias I. Graham B +� 31 13 119.21 2D9.79 A T L A NT ICSTR ZT I NTIRSECT ON A. Johnem (E� ma mar, 32 12 n9.21 209.79 +u . a r 32 13 1"t 237.60 N A P I E 8 I T S E$ f I N I E R 9 I C T I 0 .. A. liafilerd (I) Dal kiar 33 3.2 1351 237.60 lam. A. Webb E « ■ 33 13 135* 237.61D DEL AR BLVD r RTE R 8 2 C ION N 8p� Svaaier (r6) Dal Nkr 34 11 180t 316.00 1. 34 12 1801 316.80 COL 1 ST R IET INTZE 8307 ION ions 9. Scott (E) DA1 xw 35 12 801 140.90 S. 31 APL ES ST sIT INTIRSEC I ION SUB TOTAL p".36 PUBLIC WORKS DEPT CORPUS CHRISTI TEXAS SUB TOTAL 1�219.i` ENGINEERING DIVISION �� CO ^,9PILED LIT CHECKED JU 6/23/50 SIDEWALK PUM ASSESSMENT ROOSEVELT DRIVE FROM AYES STRSU TO RAMSEY STRAT PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT :FOOT SIDEWALK COST PER Sq. FOOT .44 1.76 Based pn aye Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY PAVING FRONTAGE COST IDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL NMOUNT A Y E E S S T R E E T I N T E R E C T I O N F. H. Clark, Inc. (5) Arcadia Village 2 14 119088 210.99 I. H. Clark, Inc. (N) " " 3 1 3.19.88 210.99 >� VA NDERBI LT DRIVE I NT &ft5lsC T10H ,. M. Hartman (S) Arcadia Village 6 10 105 184.80 7. T. Smother, (S) " " 6 11 105 184.80 anther Holland (N) " " 5 1 1062 183.39 3: E, Oailland•w(N) " " 5 32 106.29 187.07 A D A 11 S D R I V I N T E R S E C T 1 0 7. R. Ben (S) kreadia Village 7 17 105 184.80 L. 0. Devine (S) " " 7 18 105 184.80 PEA S E I I R I V E I N IE R S E C T I O .e,lie H. Thompson(So Lroadia Village 10 17 105 184.80 Immes J. Shaw (S) of " 10 18 105 184.80 I. Ri rlaechsbarth (N) " " 11 1 103.12 181.49 �. H. Dougle (A) " " 11 -16 105 184.80 . S. Hiller (N) " " 11 15 70 123.20 . C. Peterson (N) " " 11 14 70 123.20 teal Oauaby (N) " " 11 13 70 123.20 an M. Coker (N) " " 11 12 70 123.20 on N. Branum (N) " 31 11 40 70.40 b-To 1608 PUBLIC WORKS OEPT., CORPUS CHRISTI, TEXAS - - - ENGINEERING OIVISION ,i" _ COMPILEDL.R.T. CHECKEDE-1 -K. SID99ALK ASSEsSMENr ROOS&VELT DRIVE FROM AYM STMT TO AAWIT STRBST PAVEMENT CONTRACT DATE CLR B COST PER LINEAL FOOT CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT ;FOOT SIDEWALK COST PER Sq. FOOT 1 -.76 Based on 41 Nidtk SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT N A P L 9 6 3 T R E E T I N T E R S E C T O N N. Nelson (s} Arcadia Village 12 25 40 70.40 a. 0. Rose (S) 12 26 103 181.28 R. 0. Redwnd (S) " " 12 27 65 114.40 V. 0• Bwren (S) " " 12 28 65 114.40 N. T. Cage (s) " " 12 29 65 114.40 C. J. Stojansk (S) " " 12 30 68.01 119.70 Oliver F. Crump (N) " " 13 8 35 61.60 H. H. Patton (N) " " 13 7 61.5 108.24 Mildred Le Naise(N) " " 13 6 61.5 108.24 S. J. Steger (N) " " 13 5 61.5 108.24 Mary Lee llison (N) " " 13 4 61.5 108.24 Travis Nilson (N) " " 13 3 61.5 108.24 0. L. Greens (N) " " 13 2 61.5 108.24 H. E. Love (N) " " 13 1 20 35920 O L A R% R 1i r t I N r E R 5 0 T I N Ssb-T 830.01 SnD-7*t l 1460.82 PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION - COMPILED L.K.T. CHECKED R.L.K. ROOSEVELT DRIVE PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT SIfaSiMALK YRkFMASSESSMENf FROM AMS STREET TO RAMSU STREET CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT ;FOOT SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT 4UMBER PROPERTY IPAVING FRONTAGE COST SIDEWALK LIN. FT. .SIDEWALK COST CURB LIN. FT. CURB COST TOTAL NMOUNT C L A RK D I I V I I N T E R S L T I O H. R. loright (S) Arcadia Tillage 21 2 1110 246.40 H.. 0. Brach (S) R " 21 3 109.28 192,33 Dann Ilm Fravo* (N) " " 20 1 3.13-63 199199 4 20 1T 111►.i<8 201.118 VAxnZ It HILT D t Ivr KT& a sEC — — r ion — Pra-im Curyea (S) Arcadia Village 21 23 93.77 165404 R. R. Fitt>salD (N) " 19 1 93.77 1650 R A M S Z I S T R S E T I N T E R 6 E C T I O R 664.9) �D—Tltg� L70,28 PUBLIC WORKS OEPr., CORPUS CHRISTI, TEXAS - ENGINEERING DIVISION COMPILEOL.K•T• CHECKED E.L.K. r, PAVEMENT CONTRACT DATE CU7B COST PER LINEAL FOOT_ SIDEWALK COST PER Sq. FOOT $NWA.t XAVftT ASSESSIAENf 1 Y STH$d'P FROM ffi'11iY$ fig�i'1' P�OPIILT4 7.'ti� OF 'SAM ' ams scram 20 loosmvw lain CONTRACTOR T. ROADWAY ING RATE PER FRONT : -FOOT 1, 76 ba"d � Lt W14a SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT 4UIABER PROPERTY iDAVING FRONTAGE COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL 4MOUNT 408 QWUU bpftdftt S*boa AdAr - Sm ftuffbm gabool Propwty owt PUBIC WORKS uEFi., 1:UKMUJ O:NNIJI I, IExAS ENGINEERING DIVISION - COUP LEO T!• - CHECKED ��V ..tor SIDLWALK X== ASSESSMEN m Amv nDTvw. FROM ROOSEVELT DRIVE TO NORMN if AVENUE PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER S@. FOOT CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT -FOOT 1.76 Based on 4' width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CUR B COST TOTAL AMOUNT R 0 0 S X V B L r U I I V E I R T E It S &C I 1 0 9 Ralph E. On= Arcadia 'Village 20 1-2 114.75 201.96 Hardy *Cunoagh 20 3 65 IU-40 scatt S. Skinner * " 20 4 65 114 «40. W. J. 20 5 65 Jcaephl. Haabett " " 20 6 65 11.40 John Roindl, " " 20 7 70 123.20 T. S. Slatit " " 20 8 90 158.40 VAND RBI T 1 R Iti(E I NT 'RSE T10N S. Tyson goods " " 19 15 131.59 231.60 Payton G. Cooper " " 19 16 180.65 318vW N0ItT0IN S T A 8T I N T 4 A 3 Z C T 1 0 N 147,ond V. Mrs Arcadia Village 17 16 1A.66 219.40 J. H. Clark, Inc. Arcadia 13 17 30 52.80 City of C. C. (E) " 13 17 120 211.20 City of C. C. (wi) " 17 22 120 211.20 N0RBI I NDY AV I NU8 NT R SIC T IOS Sub-To Pr P. 1 Own s 1001 Sulu -Ta 2185.36 PU BL 1C W-S UC NI.y UUK NUJ GNN 1b II ILAAJ ENGINEERING DIVISION ,L11�_ - COMPILED L.K.TECHECKED E.L.&. NORTON STREET PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDVIALE MUM ASSESSMENT' FROM CL AM DRIVE TO E maff mzgT CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT :FOOT SIDEWALK COST PER SQ. FOOT_ .44 1.76 Baged one TI Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT, SIDEWALK COST CURB LIN. FT. CURB COST TOTAL MOUNT C LARK AR 171 I N TERS.E.G_1 _ K Byton G. Gooier B. Arcadia Village " 19 16 18.68 32.88 Dht. Mocrack" " 79 17 70 N. Sndth " " 19 18 5 123620 P. Bic 7 13240 .aall *,,m 19 75 132.00 . P. Meehan " " 19 21 80 132. llen Wood a a 19 22 80 140.80 . H. Cobb " 19 23 80 1.10.80 3llia.G.= Harden " " 199 24 80 1110.80 T. O'Nalley " " 19 25 80 140.W 140.60 RAMS 1s r S T R ET 3nb-T 713,68 b-Tota 1.256,08 YUBLIG WOKAS ULFI.y GURNUS CHRISTI, TEXAS _ ENGINEERING DIVISION `.� COMPILED L.[.T. CHECKED S.I.S. SIDERAU ISM ASSESSMENT >saTi1li STRUT FROM CLARK MUM TO NAPLES STBEST PAVEMENT CONTRACT CLR B COST PER LINEAL FOOT SIDEWALK COST PER SQ. FOOT IIJA CONTRACTOR T. ROADWAY f� PAVING RATE PER FRONT . -FOOT 1.76 Based 011 y� Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST S ID EWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL MOUNT C L I R K D R I V E I S 7E R S C T I C i Payton Bryan (S) Arcadia eilialp 15 22 72.82 128x16 Morris Ww r (S) " 5 21 65 MAO L. H. Laster' (S) " 15 20 65 114#40 Y. R. Pittle (S) " 18 65 RIrImmm Wolfin (S) " 15 18 U4,40 9. s. �t.o (18) r 5 iT 65 X40 J. J. Bssksr (S) 15 16 65 U4d40 A. 14 Jones (S) " 5 35 65 114440 Joseph Usasen (S) 15 14 65 "40 James S. Harris (S) 15 23 65 U4640 M. S. Childers, (S) " 5 32 65 79.20 V A P L E S S T R E T I K T 9 R 3 E C T E O N PUBLIC WORKS n Sub-lotal to-To 12 vrrr.1 vvn�v CHRIST!, TEXAS ENGINEERING DIVISION `,\ COMPILED L.K.T. _CHECKED E.L.K. SIDIWAU XX49 ASSESSMENT NAPLES STREET FROM MUMN S TRW TO PRIU STRUT PAVEMENT CONTRACT CLR B COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT 044 CONTRACTOR FT. ROADWAY f' PAVING RATE PER FRONT FOOT 4 1976 Based on N Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER I PROPERTY FRONTAGE DAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT S O A TO V ST R I S T I I T E R S E C T 1 O N H15 -y C. Hill (w) Aroadia Village 3 32 60 105.60 Irr" Methodist Ch. Sout norelard 12 12 119.96 211.134 i�A SON S TR ET I I TER E0T10N Chas. T. Nierek (N) Southaoroijud 13 24 139.97 246 -34 Bly Thy (B) " 13 I i39.96 246.33 � C L E g E R S T R E E T I N T E 3 E 6 I O N J. S. Hagan (w) Southmorelaud 14 24 139.97 246.35 it R. T. Stoner (W) U 14 1 13906 246.33 it R I C H A R D S T R E E T I N T T 1 S E C T I O N Boss Jeffers (ti) South>awaland 15 24 139097 246.35 YAM* Blaisftn(N) " 15 1 139.96 246.33 B L S V I S S S T R E E T I N T E M S E C T I O N Mrs. Nm. S. Smith Southmareland 16 24 739.97 246.35 Martha Z. ?*are= " 16 1 139.96 246.33 T A R L - - T 0 N S T - E S T N T E SEC I 0 A. B. 1i¢Caughan (s) Southmarelilad I? 2r ]39 -97 ' ° - - - - 246.34 P. H. Ponall (w) " 17 1 139.96 246.33 EDWARD3 S TRB 6T I NTE SSC TI0X _�gg��.�� la'PaAot�I Ayars() Saath>BorelalBd - } - � - - - - - - PUELiG RVKRA UCYI., UUKVUS CHKISII, TEXAS sub -+otal 1559-54 Saab -Total 3272079 ENGINEERING DIVISION *,,�`.' COMPILED y X_T_ CHECKED w T' r L kMJ3 STREET PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT ,,•44 SIDEULK Z1X= ASSESSMENr FROM NORTON $TRBET TO DICE STREET CONTRACTOR FT. ROADWAY NG RATE PER FRONT FOOT 76 Baesd on 4' Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE AVIN6 COST ID EWALK LIN. FT. SID €WALK COST CURB LI'N. FT. CURB COST TOTAL AMOUNT SA f LT T E 8T T I TER €CT ON E. N. 2etio" (w) Southa�e7aet8 19 24 139.97 246x35 4 Frank Readl (B) 19 1 139.96 246.334 T R0 1 PH I I S 8 TRRE I I Bi - 9R 3 E C T I O - - R• E. Lynch (W) 6outhaora7aad 20 24 139.97 246.35 Iiif L. B. Wanness (w) " 2A 1 in 096 246.33 71 C A R r X R 3 T R 9 E T I N T R R S E C T 1 O N Frank A. Roarer (W) lwthmoreland 21 24 139.97 246,35 Jarsb A. Naard (W) • 21 1 139.96 246.33 4 &O 5 AR 3F TR$ET IN r &R8ECTI _ - - - N A. B. McGehee (W) 'outlmarel nd 22 24 139.97 246.34 Thomas P. Frans (w) " 22 1 739.96 jill .246.33 >� P R I C K S T R E E T I T E R E C T I 0 N Sub-T S-b-T-4a I rVOLIV WORKS DEPT., CORPUS .CNR 1511 1LXAS ENGINEERING DIVISION COMPILED L.K.T. CHECKED X.L.K. D L 0 A' w SIDEWALK WMASSESSIAENT' PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER S@. FOOT CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT :FOOT 1,7f, Bawd on )I' Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING CO3T IDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT NOR I A ND r A V R. I NT9R S 1;C It I ON oris P. Sloan (W) Arcadia 16 15 35 61.60 . W. Orton (W) " 16 16 65 arl.k. donna (W) " 16 17 65 1U,. 40 no. N. Johnson (W) " 16 18 65 MAO ens bmkusr (W) " 16 19 65 131$*ko ao. 0. Gr W " 16 20 65 "rda Franklin (W) " 16 21 65 11640 Lfred Links (W) " 16 22 65 11610 . W. Graves (�i) " 16 23 65 114.40 . Mack__Boad (W) " 65 114 40 Aitt G. (W) 16 25 65 11&.10 • L. So"n, (W) " 16 26 65 11440 • A. Richter (W) " 16 27 44.39 78.134 L Shoop (W) " 15 12 35 61.60 um1 $rasnsr (E) " 15 11 65 1U-40 !o. G. Wicks (8) " 15 10 65 11.40 R. Brown (S) " 65 114-40 H. 4uarier (N) " 15 8 65 114.40 Ml C. Wellman (E) " 15 7 65 114.40 b-Tota 1031.73 PU13LIC WORKS DEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION I COMPILED �-XeT• CHECKED E•1'•g' SID EnU __YAM ASSESSMENT L06AN AVENN FROM NMIAANDY AVREItZ Tn In- CaTnLa AVBNDR PAVEMENT CONTRACT CURB COST PER LINEAL FOOT CONTRACTOI FT. ROADWA PAVING RATE PER FRONT ; -F00 SIDEWALK COST PER S4. FOOT ,), ; q/, Be Wades 41 Wi,ilh SIDEWALK RATE PER FRONT FOO' _J PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN, FT. CIA 6 COST TOTAL AMOUNT arren B. rhmips E) Arcadia 15 6 65 114.40 arr7 F. Psy,�s N 114.40 W0 � (z) 0 15 4 65 rank Y. LiJgptt (S) N 15 3 6$ U . W. -zl= (3) N 15 2 65 lsa D. Carlsie (1g) " 15 1 81.31 1434U . B L E V I N S S T R E E T I N T S R S E C T I O N PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS .. _ ENGINEERING DIVISION `, - COMPILEp ,� q .. CHECKED r.i 1lriamr- SIDEWALK PA:MASSESSMENf L00AN AVLIQ FROM NO&1d M 1VENn TO FljMTDA AZ- Z PAVEMENT CONTRACT CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT hh CONTRACTOR T_FT. ROADWAY PAVING RATE PER FRONT :FOOT L76 Based on ht Wi-dth IDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CUR COST TOTAL AMOUNT B L E U N S 3 T R 1 E T I 11 T E R 5 9 C T 1 O N ilton H. vaeis (w) Arcadia 9 15 64.97 114.35 4 . T. Cunningham (w) TM 9 16 65 174.410 ee a. mosl`y (s) " 9 17 65 114,40 do. B.li011idpy (11) " 9 18 65 11640 TM 114.40 . Z. Mathis (g) 9 20 65 do. F. Ii1llicsa s) 9 21 65 114. 40 . P. Munson. g) " 9 22 65 ®rtham Parker (11) " 9 23 65 . a. Hn (w) m9 24 65 . M. gsr (w) s 9 25 65 11.4.40 . LjOr"n (B) 9 26 65 714,40 ass D. Wolcott (11) ' 9 2$ 65 4*40 . Harvey Johnson (W) " 9 28 30 . B. "oleman (E) W Im " 10 2 75 65 132.00 III Z. Skur (E) " 10 174.110 114.40 ric 91katrand (g) " titer Creech () TM 10 5 65 114.40 b-T 1 1209.97 gnb-10 �'129*55 PUBLIC WORKS DEFI., CORPUS ;HRISTI, TEXAS ENGINEERING DIVISION \�� - COMPILEDL X CHECKED SIDEXAM *" ASSESSMENT LOGAN AMUS FRDM Di0$i(A01 AYEN M TO FLOMA AVSNN PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT .41 CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT :F.00T 1.76 Based on 41 Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LINe FT. SIDEWALK COST CURB LIN, FT. CURB COST TOTAL MOUNT .0in W. Knight (S) Arcadia Arcadia 10 6 65 - U4.40 L. F. Bats (8) " 10 7 65 I'is S. Gilliland (N) " 10 s 65 114.40 tobt. L. sink.too (S) " 10 9 65 1U.40 tdward Pretser (9) " 10 u b 111.140 1. A. Hoome (S) " 10 12 65 114.40 I. J. Watson () 9 10 13 65 0 y1. R. Kaplan t /p " S ti E L 7 T R E 8 T I N T S B 8 E C T 1 0 N Sub-Tot Sub.To 932.80 PUBLiC WORKS DEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION COMPILED L.S.T. .CHECKED X.L.K. i J J ( I 7 7 _jjMASSESSMENr FROM - PAVEMENT CONTRACT DATE CLR8 COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT uqg CONTRACTOR FT. ROADWAY ING RATE PER FRONT iFOGT $IOEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE AVING COST SIDEWALK- LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL MOUNT 5 HE 2 STRE T IN 9It3 E C TI N L. E. Roasch (W) Arcadia 6 18 65.59 115.44 0 I. E. - Lane (W) " 6 19 65 114.40 1. ]S. A (W) " 6 20 65 11640 41kw W. arson (W) " 6 21 65 314AO ;has. C. Norwood (W) " 6 22 65 1111.40 laul `Waraneh (W) " 6 23 65 33.4:40 :. N. Johns= (W) " 6 24 65 3.140 -40 ay 0. Eridler (W) " 6 25 65 3,14:40 rack S. Lore (W ) 6 26 65 114-40 1. A. Andrew (W) " 6 2T 65 114.40 . W. 1waw (W) " 6 28 65 114.40 lanes R. Rhodes (W) " 6 29 65 114.10 N {W) " 30 65 3. 14.40 arl icde 6 a. Wynn (W) " 6 32 91064 161.2 -9> lsudine H. Thompson 0)" 6 33-34 146.26 25T 42 0 . R. Mathews (E) " 5 12 30 52.80 board C. Arnold (E) " 5 n 65 114.40 aul J. Madwell. (E) " 5 10 655 31,41�.40 hula Harbor (E) " 5 9 65 1+4.40 Sub-T 1392.89 2,451.49 ENGINEERING DIVISION y COYPJLED 4_r_4_ CNE611E0 a_i _vim a SIDBBAU a>01111101111 ASSESSMENT IMAM AVFMZ FROM NORMAOX AVENUE TO FLAWDA AVENIZ PAVEMENT CONTRACT DATE CLR B COST PER LINEAL FOOT_ SIDEWALK COST PER S4. FOOT CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT ;FOOT 1 i4 $mid on 1.1 ■{ dt �SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CUR COST TOTAL AMOUNT B. BraokWiller (E) Arcadia (E) s. L. Bolton ls■. IN Bolton (8) " 5 6 65 114.40 & ($� " i. H. Renfre■ (B) " 5 4 65 � 1. Haney (E) " 5 3 65 • F. Schroeder (Z) " 11 18Lx B. Haeskleaeaxt (E) " 5- 1 115 202.,10 FL0R I DA A V S. I NTE t 5EC _ IDN .ty of Corpus Christi(E " ..Park 190 334.40 tr-To , Pro . Onmrs 595' Sub-To 1.Cjt3 190 �b—TOU4 1,381.60 rUOL14 "ORKS DEFT., CORPUS GNKISII, TEXAS ENGINEERING DIVISION .� COMPILED Lri CHECKED ZW C c m k F a y !s 0 SIDEWALK 1XXMASSESSMENf SOUTH STAPLES STREET FROM NORTH ARCADIA &NTRANCB TO ALAMEM STREET PAVEMENT CONTRACTDI CONTRACT DATE - FT. ROADRA' CURB COST PER LINEAL FOOT 11 1 h PAVING RATE PER FRONT :F.00' SIDEWALK COST PER Sq. FOOT ou 1.76 Based on ' Width SIDEWALK RATE PER FRONT FOOL PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT 4UMBER PROPERTY FRONTAGE PAVING COST S ID EWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT N O R T H E q T R 4, 60 H T 0 A R C A D A Lty of C.orpna Christi Arcadia l ntoa E. Burnett " 1 2 65' 1111.110 aptist Temple " 1 3 65' 114.110 rs. Aline Hafer " 1 4 78' 137.28 1 8 T H S T R E E T I H T E R S E C T I O N Lrer 0. J+ae P. A. Cliffs 1506 5 131.06 230.67 . rieda L. Patton N " 1506 It 111.06 195.47 1 T H 5TREE T IN TE:RS CTION )a. IS. Byrnes " " 1406 3,34 5,36 171.36 301.58 argarst Hardy Merchant's #6 1405 020 102.52 180.43 , �rl�xzxx� 1 6 T H S T R E E I N T E ?t 8 E C TI —0 ra. H. I. Whitley 1305 113, L4,15,1 6 139.89 216.21 I�T SPREE - - - -- INT - -- RSECTIO - - - -- — 11�}T STREEr I N T R S E T I O •a A. Chapeau Merchants #2. Olt 13,34.35 115.05 202.119 T Il &9h � .� 4V11 rUJ VAR IJI I� IL.NJ ENGINEERING DIVISION COMPILEDL.1<.T. CIECREO E.L.$. CTTIT'SILY ASSESSMENf PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT 'Ail CONTRACTOR FT. RDA DWAY ING RATE PER FRONT FOOT 76 Bm "A „,,,,,, L ��,,.yl,,S IDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN, FT. CURB COST TOTAL AMOUNT BR 0 W N LE Z BL D. I N 3R 6 EC TI O N 10TH s R E F. T INTERS C T I O N • E. Shannon. Nwahants #4 904 37-38 75 18.00 A L A N D A 3 T R I E T 11 T E R SCOT ON PUBLIC WORKS DEPT.,- CORPUS CHRISTI, TEXAS - ” ""' '� - _ ""'t OXALL jJ.dc.w ENGINEERING DIVISION . \ COMPILEO14 g. a. CHECKEOX Z IK SIDENALK 1MASSESSMENT 16TH STREET FRO. SOM BTAPIM STREET TO MORGAN AVESM PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT ,A. .44 CONTRACTOR 'T. ROADWAY PAVING RATE PER FRONT -FOOT 1.76 Based on 4' Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT, SIDEWALK COST CURB LIN. FT, CURB COST TOTAL AMOUNT S. S T P I E S S T R E E T I 1 T E R S E C T I C N Irs. Eilliam aecoe(E) Marchanip #6 1305 49-57 250 WAG Mrs. 0. B. Ingram (S) • 1305 45-48 100 176,00 N• H. PLPa' (E) " 1305 43,44 50 88000 Lila V. Johnson (R) " 1305 41,42 ra 88000 Esther 01 Nielson (E) " 1305 39,40 50 88000 J. L. Fergus (E) " 1305 37,38 50 88.00 J. Y. Boyd (E) " 1305 35,36 50 88000 H. A. Horne (E) " 1305 33,34 50 88000 Margaret Hardy W " 1405 4,5 50 88,00 Q. Baker (W) " 11105 6,7 50 88000 H. 0. Schoanfield (W) 1405 8,9 50 88600 Fra3* S. Bonham (W) " 1405 10 25 44000 aw Crittenden M 1405 L1,12,13 75 B2000 S. 0. Nelson (H) " 1405 14 25 44.00 F. S. Bonham 00 • 1405 15 25 4600 F. V. Arnica (W) " 1405 16 25 4600 MW Crittenden (e) 1405 IS 25 44ow Jams E. Ritchey(') " 1405 18,19, o 75 132.00 Pierce Downer (W) " 1405 31,32 50 88.00 C L E T R E T I T E R 3 F C T 1 O N Sub-To al 1125 Sub-T-+ 19800100 r i n UK Ka ULYI., UUK✓VS CHRISTI, ERAS ENGINEERING DIVISION C COMPILED L.X.T. CHECKED E.L.E. ll N SIDWAL6 FA RI, ASSESSFfENr 16TH STREET FROM SOUTH STAPLES TO MORGAA AVENUE PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT _ SIDEWALK COST PER Se. FOOT CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT :FOOT 1,76 Based an 4' Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK IILOT NUMBER NUMBER PROPERTY FRONTAGE AVING COST rIDEWALK LIN. FT. SIDEWALK COST CURB LIN, FT. CIA B COST TOTAL AMOUNT C 0 S S r R E T I i,i E Fd S 9 G T I B Baptist Temple (E) Merchants #5 1304 5 175 Dr. Fred ff. Bauer (E) 25 44.00 D. W. Schsenrield (E) ■ 1304 54,55,56 75 13200 1!. M. Gabriel (S) " 1,304 2,53 50 8840 6. N. Rlattte (E) " 1304 51 25 44'.00 James L. West (E) " 1304 48,49, 18800 I. L. Lawmm (E) " 1304 46,47 5D Mre..Harry, Stanford (E " 1304 45 25 www lire. W"h F%esnw (9) " 1304 43 44 50 88.,30 C. A. Whitmire (E) " 1301[ ,at1, 2 T5 132400 hear T. Wins (L) " 1304 38,39 50 88,00 R". wash'Flamor (a) 13o4 3T 25 44,00 Z) k. Rawest let. (E) " 1304 35 25 1 X00 f9sa F. Branch (9) " 1304 33,34 50 88*00 'aml H. Howard (W) 0aras.Benepides 1404 18,}19 200 176.00 'earl Sturgis (B) " 1404 20 50 88,00 Are. Armin A. aenkina( " 1404 21,22 100 176.+00 grad- H. Woodward („�] " 1404 23 50 88,110 (Ca TINUED ON HE.z r PAGE) lab-TOtA 1 1100 -Total 36.0© PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS _ ENGINEERING DIVISION COMPILED ! .T,. CHECKED E.L.K. 3IIWALK 'PR'P7T'ASSESSGENf 16TH STRE!'sT FROM SOUTH STAFUZ S'EET TO MM"N AVENUE PAVEMENT CONTRACT DATE CU2B COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT .44 CONTRACTOR T. ROADWAY PAVING RATE PER FRONT :FOOT 1.76 Based on 4' Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NuMSER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT, SIDEWALK COST CURB LIN, FT, CURB COST TOTAL AMOUNT W. $. Pellitt (W) Garza Benevides 1" 24 50 88000 L. D. Gadberry (W) " 1404 25 50 88,00 Wallace L. Goad (W) " 14% 27 50 88t,00 Jae. M. Woenig (iN) 1404 28 50 8" Pebble wart M 1404 29 50 88,00 A: J., We" (W) " 1404 1 200 3510a A Y Z R S 3 T R I E T I ji T E R 3 E C T I O N D. bassous (E) Fitchue 1303 59,60 50 88 }GO mar- y -H. Trmnmeu (s) " 1303 57,58 50 88;00 8. K. Marshall ((E) " 1303 55,56 50 88.00 John B. tTloek {E) " 1303 53,54 50 88100 Dora Selinger (E) " 1303 51,52 50 88,00 E. H. Viofford (E) " 1303 49,50 50 88;00 E, C. Kirtley ( &) " 1303 47,48 50 88.00 0• B. Blagg (E) " 1303 45,46 50 880,00 R. P. Watts (E) 1303 4144 100 176,00 H. A. Schoenfeld Jr.(g " 1303 39,40 50 88,00 a. U. Correa (E) 1303 37,38 50 88,00 Lna L. Sherrill (E) " 1303 35 36 50 88.00 Us Brandon (W) " UO3 1:Z 100 176.00 (C NTINUEU ON THI NExT PAM ) Sub-Tati ki, 1200 Sub-To 1 2312x00 PUSL IG /Y UKK� ULFI ,� GURPU5 CHR I5T I TEXAS ENGINEERING DIVISION `''A L.K.T', rucrvcn B.L.K. SIDS ASSESSMENT PAVEMENT CONTRACT DATE CU78 COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT CONTRACTOR ROADWAY PAVING RATE PER FRONT FOOT 1.76 Baead On liR Nidbh SIDEWALK RATE PER FRONT FOOT PROPEpTy OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE - PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT e CURB COST TOTAL AMOUNT P. 3. Dgpt (if) Fitahme 1403 5,6 50 88.00 F. M. Pearce (w) " 11403 13-1.6 1012 � A k'. ,, 2�,''- & 176.00 IIorie P. )7Ore (W) " 11103 17,18 50 88000 Stb#1 R. Holly (W) s 11x03 ,20 % 8$.134 Garza (W) 1403 21,2(1 100 Foravk T al EYaalt T. Leal (W) " 11403 25,26 50 88,00 F. R. Fisher ` () " 1403 7,28 50 88.00 Juan Oalvan, Jr. (h) " 1103 2 100 176.00 M a Y S N Z E STREET I N T E R S E: - - - C T 1 a - - - - W. T. Hamlett (S) Bay Terrace #2 1302 3,61; 50 88.00 Mrs. J. B..Crsit (S) 1302 1,62 50 88000 J. A. Avant (S) " 2302 9,64 50 88*00 R. E, Norrad (S) " 1302 7258 50 88,00 F. C, 1egmatt (S) " 1302 3-56 100 176.00 C. I.01"n (S) " 1302 1,52 50 8800 Marvin L. Nichol *(E) Y' 1302 9,50 50 88.00 Carroll C. Carter(H) " 7,488 88 00 W, B. %nax (E m ° 1302 , 5500 • 88,00 Robert L. Moore (E) " D 88000 Martha C. Boleaan(S) ° 33022 5-1♦2 2 352,00 J. N. Bo].eman (8) ' 1302 13,34 50 88900 E L I Z A B E T H S T R E E T INTERS 8 T I O Bub-Tattl 1350 Sub-To 2376.00 CORPUS CHRISTI, TEXAS ENGINEERING DIVISION COMPI LED _ _ CHECKED __ _ 16TH STPY= PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT FiIDEWALE P01KASSESSMENT FROM SOUTH STAPLES STREET TO VOROAN AVSRBS CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT :FOOT 1,76 'Rased on 4' Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CIRB COST TOTAL AMOUNT EL I Z BETH S TIt9BT I N T RSZ 0 TI O N Weatley v. Evans (S) Bay Terrace #2 1301 61-64 100 176 00 Preston Walston (S) 3301 59,60 50 88.00 John a. Gray (E) " 1301 57i5S 50 88.00 Auk," S. Smith (E) " 1301 54#55 75 x.00 N. Y. Perry (E) " 1301 52'53 50 8800 Floyd D. Morgan (E) " 1301 50,51 50 88.00 A. J. Neff (E) " 1301 46949 100 1 ?6.00 S. J. Nruska (S) " 1301 43144, 75 132.00 Carl S. Wes t (S) " 1301 G 25 44-OD Robt. Vogel (E) " 1301 40,41 50 Now Y. R. Dickenson (E) " 1301 X35, D6,3T 62.5 110.00 Elsie Man 3haokeliord() " 3.301 343,534 V. L. Bell (W) " 1401 3,2 62.5 50 110:00 88,00 Wm. L. Workman (a) " 1407 3#4 50 Don B. Johnsort (s) " Be Bnai Israel Sym.(W) 14001 1 7,8 550 0 Mattis 1401 9,10 50 88#00 Stockdill (W) " 1401 11,12 50 88.OD J. N. Mahan (s6) " 1401 13,34 50 MOO Wahan (W) W W " 11101 15,16 50 88000 (COMI M ON THE NEXT AOS) Bub-To U T 2024.00 PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION COMPILED L.K.T. CHECKED E.L.Se 971OINAT% PA= ASSESSMENT- .:_ PAVEMENT CONTRACT CURB COST PER LINEAL FOOT SIDEWALK COST PER S@. FOOT_ i 44 CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT ;FOOT SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST 5 ID EWALK L N. FT. S1O EWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT E. C. Manson (W) Bay "Brava 02 14M 17, 5 88e(* V. S. Frierson (N) " 140, 1s, R. W. Priddy (W) • 1401 21, 50 88100 JL®ie Argiros (W) " 1401 23, 50 88600 H. W. oviatt fW) " ]1401 25, 50 88 +00 Mrs. 1T-. a. King (11) • 1401 27,2 50 88.00 29, Warrkmn (W) • 1401 .3 50 88.= P R E G O T T S E E E T I R T E R S E T I O R W. D. Lyons (E) Bay Terrace #2 1300 63,64 50 88000 Levier Arend W " 1300 61,62 50 88:m Don G. Cowart (H) " 2300 59,60 50 88.00 J. L. Hoting (E) " 1300 57,58 50' 84w Martin R. Jansa (B) " 13oD 55,56 5o 88900 Harry W. Weir (E) •. 1300 53.54 50- 88400 Leon F. Warren (E) " 1300 0-52 120 211.20 J. V. YcCpg (w) • 7400 1,2 56 88,O1f A. X. Shopgnrd .CA) " 1400 314 50 88.06 Am. sane. (W) " 1400 5,6 50 88:66 Virginia Mitchell (W) " 14M 7,8 50 88,00 (Cot rifmn ca THE axT PAGB) 9nb.: ISub-Totall 11795820 PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION `,`."� COMPILEO_7k'K.jr_CHECHEO SIALY ASSESSMENT 16TH STREET FROM SOUTH ,STAMM ST8Ss6Yr TO MORG&N "FJ= PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT CONTRACTOR T. ROADWAY PAVING RATE PER FRONT FOOT SIDEWALK COST PER S@. FOOT ow 1,76 Based on 4' Eidth SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUM13ER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT Lama Pooles (N) Bay Terrace /2 111co 9,10 50 88000 Elizabeth Barrms (N) 7300 11,12 50 88.00 Pearl Krastner (a) R 14006 13,34 50 8&00 Ssid & Nadia Kash® (W :ORGAN 1400 15-18 100= 176300 A Y E M U I N T E R S E C T I O N b-To 250 kb-T© l 410.00 KQ 1 . CORr .J IRK 10 1,1 1 rAAJ ENGINEERING DIVISION \"`J{I COMPILED L.K.T. CHECKED 19.L.K. 19th. sum PAVEMENT CONTRACT DATE CIRS COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT PAVING ASSESSNENr FROM PZWOM SUM TO S. NOMMART LIN RU TIIRRACS 02 AWITION CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT :FOOT 1.96 based as A' V1dWIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE AVINB -COST IDENALK LIN. FT. SIDEWALK COST CUR® LIN. FT. CUR COST TOTAL kmoLwr P R Y 9 C O 7 T STI ZIT I N T I R S I C I I O N 10eaha !my Tarraea #2 1601 38,42 1251 220.00 3brah er 176,00 Maggio K. SArra 4 I a N N n 476" 501 SS.00 Fl.OTd S. Palmas 2 R R R x 49 251 ,x„4,'00 D. A. Cara n R q R 50-51. 5D1 88.00 C. I. �I tl N q R 132.00 C. V. Fal�naai q n R tl 5" IMI 17 +.00 SmUmi a R. Falcon (I) n R N R 59-60 50t 88.00 Abel G. Mortises (I) R R N N 61-62 500 86.00 Blanche S. Loakle (I) n q R R 63-U 50f 813.00 33LI AR I T ST R II T IDT I R 9 1 C f 10 11 B. Itoehall Eat. I) Day Terraee #2 1602 3>40 200r 352.00 1. J. BDOelnagra I R R R R 41-42 500 88.00 Mentes 4." 10 S$.00 3. R. O rapas 45-46 sot 48.00 knie A. OMartney (1 R R q q 47-49 5+2 88.01 11Bt 0. Stewart (R W R tl R 49-50 _ of 88.00 Tum$ X. saani rz R M R R 51 -52 501 W.00 ftw* Cook G. I, Chappell ! n R n R R 53- 56-60 751 1251 132.00 220,00 Sim 4n #2.420.00 ENDINEERING DIVISION in TOM - 13756 COMPILED ��_CHECIffO� �_ PAVING ASSESSMENT 19th, S18Ew FROM PRSSCDTT S?B.TWHT TO S. DOLIHIM= LINN BAY TI MUM #2 AM ZMABSTS STSSST nM 38th. To 19th. PAVEMENT - -�. CONTRACTOR CONTRACT DATE FT, ROADWAY CURB COST PER LINEAL FOOT SIDEWALK COST PER S4, FOOT PAVING RATE PER FRONT :FOOT 3.76 banR9 --At Vlffh SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT I UMBER PROPERTY I FRONTAGE PAVING COSS SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT Robwt F Lim (E) Bq Terraaa #'2� UO2 � 88.00 j 50f 88.00 WeX HZ IN STR ST INTER SECT ON Haams ©• ($) " 1602 3340 186.611 328.43 S. B HX ARY L INN NATIERRACE #2 1 L I i A 2 X T 8 3T I SET FRO 34 38th To 19th A T I ST 18TH TRSST IS SR 8 Z C T 10 S Aoffi.Seogin {X Ray Terrace 1�2r 1601 1 2251 1602 32 1251 220,00 Manehe S. Look3er (S * ■ • 220.00 J. R. Roehslle Est.(S a ,. 2602 33 3251 220.00 224.00 19TH 1 TRSST IX SRS 3 0 T I H 80B AL ,314.43 P11P1 IC WnBI[s nF UT nno ra is nnn ENGINEERING DIVISION MW TVKAb 736.b7' : "� COMPILED LH' CHECHED 50 PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER S4. FOOT VINE ASSESSHENr 41=LR!X FROM Oon go 3fibb CONTRACTOR T. ROADWAY PAVING RATE PER FRONT :FOOT 1 _7Y.. based an At ritg�P SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE AVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CUR B COST TOTAL AMOUNT 1eDsa4e1 Realty Co.(B) 'ity of Corpus Christi 'Saves Dowser (E) fossph Sikora, (w to L. Soott (w) ►allie Ssfth w cordon A. Caraway w 10W C. Rem" C. L. Laird w G J. Ruiz w �. L. Simon w) �. E. Salis )j w '. To i'sffingwell w Am F. Warren w) tike Ciatlaie w) Ilton C. Jones w) waulaoor Part 103 (E) " " n Pineda Park Sikora Subd. Broadmoor Park " " « „ • " " w " v w " OS AY 1 9 U I I NTZ�Szcjlog 011 440.00 35.20 1,100.00 1,161.60 $8.00 88.00 88.00 88.00 $8.00 $8.00 88.00 88.00 88.00 88.00 86.00 88.00 2 2 2 3-6 Alley -10 0-18 ON 2501 209 625' 6601 S H ST NTYH 4 4 4 �, 4 4 4 4 4 4 4 4 22 11 10 9 8 i 6 5 4 3 2 1 501 501 504 �2 501 501 50' 501 50t 502 502 501 tity of Corpas Christi (E) Pineaa Park : STRZZ TIINTJRSZGITION 240.80 Park Mock 801 Su 13,933.60 PUBLIC WORKS DEPf., ENGINEERING DIVISION �RPUS CHRISTI, TEXAS r\ 03 TOTAL - 2,2352 COMPILED _CHECKED >e PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER S4. FOOT PAVING ASSESSIAENf FROM PMr-AVEM r0 i9th. ssm CONTRACTOR . ROADWAY PAVING RATE PER FRONT 'FOOT 1.76,m SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CIAB COST TOTAL NT MOUNT W. F. Sass V rOaer Pant 3 22 5p � 98.00 A. 8. Casimn (w • • 3 11 501 .T. A. Law w 0. C. T abl" w R # • ■ 3 10 501 ".00 Cart Cornaliys w • ■ 3 3 5 1 , 88.00 L. L. Bead w R ■ 3 6 501 88.00 M. B. Sherbet w • e 3 5 501 88.00 . B. Zm1leask w) R " 3 4 501 $8.00 Oliver 411v R. Gray • • 3 3 50' 8.00 Va. J. Ferguaw (w n a B 1,2 i00' 88.00 176.00 XGD L I I L STREET INTZISZCTIOX V. S. McLaughlin w) ProaBmDar Park 2 12 50# Ruby A. William w n W z 11 50 , 98.00 Alm staalaadr w N 2 10 50, 88.00 E. X. rnig w d R 2 4 508 88.00 George Jaokins w W W z 5 500 88,00 J. Brace a w a N 2 7 �a 55.00 Bean E. Edinbur w N ■ 2 85.00 &o11an S. Robsrtson(w) ;.t,)M „ 2 5� 5 88.00 ixiihar E. go13q w () R ■ 2 4 500 88.00 88.00 SUR TOTAL 41,760.00 PUBLIC WORKS DEW_. CORPIIF r41RIRT1 TC- ENGINEERING DIVISION _ Isao 1:llali. 1,OWN COMPILED CHECKED JfC2i�50 PAVING ASSESSHENr PR&SCO1T STREW! FROM PORT AVM= TO 18th. .SMM PAVEMENT CONTRACT CURB COST PER LINEAL FOOT SIDEWALK COST PER SQ. FOOT 476 based 43 width Q CONTRACTOR FT, ROADWAY ING RATE PER FRONT :FOOT IDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT (NUMBER PROPERTY FRONTAGE PAVING COST' SIDEWALK L N. FT. SIDEWALK COST CURB LIN. FT. CUR B COST TOTAL AMOUNT Pinkie A. VIdGillet Broadmoor Park 2 3 50t 86.00 Ama Nyna_' (W) a " 2 1 -2 1009 176.00 S,6110RA STREET I TERSE CT I R Laatia W. Regan (W) Broadmoor Park 1 12 501 88.00 D. J. Samperi (W ^ " 1 11 W 88.00 Caliato Pnlido " " 1 9-10 200; 176.00 Richard Beak W IWW " 1 8 501 8$ 400 R. E. ^ r. 1 7 50+ 88,00 I..`7. Brom W) " G. C. %hats W) " 1 5 50+ 88.00 Adolfo P. Potela SW „ " 1 2-3.4 150' 264.00 Uaiae Benevidas (W� " " 1 1 550* 86.00 BA DWIN ALV I& BRSEOTIL S. R. 1 � Southwest Heights 1 1-4 2000 352.00 R. hlia 5 50 W.00 Tom C. .saver W " " 1 6 501 8$.00 Jay maker W Fred 0. Nmnsr W „ " 1 8 501 88.00 J. R. RL mm R Tracy 5 21-24 200* 352.00 Rarry G. nmuw 2) Tracy 5 20 501 88.00 BUD 70FAL .. $2,46x,.©0 �v •• unno ULF,_ CORPUS CHRISTI, TEXAS ENGINEERING DIVISION Be TOTAL IAMI COMPILED_ T�p_CHECKED JRC 6/221W k S 1 J )d 1 J 1 J J r a WING ASSESSMENT FROM FMT A1TEJM TO 113th. • STREET PAVEMENT CONTRACTOR CONTRACT DATE FT. ROADWAY CURB COST PER LINEAL FOOT - PAVING _ PAVING RATE PER FRONT :FOOT SIDEWALK COST PER Sq. FOOT _ 1.76 based on 41 VIdUSIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY IPA FRONTAGE VI HC COST SIDEWALK I LIN. FT, SIDEWALK COST CURB LIN. FT. CURB COST TOTAL 4MOUNT bma" u. Ltsanc (E) Tmcw 5 19 500 MOO areelino beosnegro S " 5 1$ V W"00 athomy "wr E) " 5 17 501 88.00 J r R A C I S 3 T R 2 T I VT IR91CTI Jr ally lY entasbM (W Soutbwest Heights 2 1 501 88600 . A. 010kenson * " 2 2 564 88'00 thel Staker (W " " 2 j 50t 8800 re. *rgsret Rardy (W * • 2 !� 50t 88.00 MR Fraadolig w " * 2 5 50t 88100 . R. Clouse (w " * 2 6 501 WOO rich G. Ratbke (w " * 2 7 50' 88100 • L. 7obnam (Ji " * 2 8 501 88.00 D R A I SAN STRICT I TIRSBCTI (I rank Raaiahav (w) Segrest 1 1 501 8800 mac. as�ren t2 " 1 3 50t 88.000 0 �mq A. 1Jekermea M) * 1 4 301 88400 Ilford 6J. J)aeie it iwi * 1 5 501 88.00 om10 R. 0eker * l bt 501 88.00 $eq a s"{' S'1'rcc-F L_ fCrjcc loy S M m6L SL,496.00 PUBLIC WORKS UEPI., CORPUS CHRISI1, IEXAS t � ENGINEERING DIVISION I.\ So TOM — 850-1 CO"PILEI) Lff CHECKED . o1� R, M: A, Q MI W. Js M. R, B, C, S! U, PAVING ASSESSMENT PAVEMENT CONTRACT DATE CLRB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT CONTRACTOR ROADWAY PAVING RATE PER FRONT :FOOT 1_76 ba_Md pn 4 VjdWIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT �NUMSCR PROPERTY FRONTAGE PAVING COST IS11 DEWALK I LIN. FT. SIDEWALK COST CURB LIN. FT. CUR a COST TOTAL AMOUNT S& G R E S T S T R SET INTER SXCTIC N G. Medina (V sweet 2 1 50' 88.00 mnel Volent W " 2 2 501 88.00 0. Peters (W " 2 3'4 loot 176.00 Tdie Dom11est (W " 2 5 501 88.00 ble White (ant) " 2 6 $01 88.00 HL6 Z L 2 1 8TH$ It T I I TSRSECTI C N D. Lowe (W SeBreat 3 1 500 88.00 • Mastracche W " 3 2 50s 88.00 E. Elie Si • 3 3 501 88.00 Iand Schwtte W " 3 4 501 88000 J. Crawford W) it 3 5 500 88.00 ®.Spohn do J.A.E%fts(w " 3 6 501 88.00 mon Gonsalas (E) Stewart mrmam 2 12 75.651 133.14 H8I A LEY STRE T I I T I R S E C T I C N lgmmeis Pena (F) Bay Tenses #2 1601 32 1250 220.00 18th. STI SET INTENSECTION I Pl,PJ aC W-- nc or SUB 4114D9.14 ENGINEERING DIVISION SUB TOTAL 800.651 aY� COMPILED LU CHECKED J" 6/22/50 PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER 59. FOOT PAVING ASSESSMENT SAITA SWU FROM RALMM $lyp. TO nAWIS BMW CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT : -FOOT 1.716 baked em At width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER N NAME OF ADDITION N BLOCK L LOT P PROPERTY P PAVING S SIDEWALK S SIDEWALK C CURB _ C CURB T TOTAL ` J. M. Gum= I 8 8ovthues't lkisbts 5 5W 8 818,0D 5 - 1 16 5 Mrs. A. J. Aeakia Z * * • 5 5 1 15 $ $0+ 8 88.90 D. T. Tyler E 5 e x 5 2 24 5 5Dr 8 88.00 dnlia G. Valenta {a ^ ^ R + + l�. F. Piszim ( • R 5 5 1 12 5 50v 9 98.00 (($ • e N 5 5 2 21 5 50+ 8 88 Pr ssdlsr S + + K Phillips A A 2 2 5 50+ 8 88.00 ffexbart S A 2 2 4 49" 8 86.24 Sald.emsss V 1. L. Etmneat W R R A A 4 4 4 4g+ 8 86.24" 1. S. !'Aroobers li • • A A 5 5 4 49+ 8 86.24 Iwilt n sit Y N N A A 6 6 4 49+ 8 86.24 Rolon T. Falkerson (W ' ' A A 7 7 4 49+ 8 86.24 %xvey J. Ends W " " A A 8 8 4 49.39' 8 86.99 TZRARCTION = =am 4 443W.3f UBL enwais c cuo iSTl TE DIVISION 'xqs MM TOTAL 743.39+ � COMPILED Sff_CHECKED_jj&__6j22/M SIDSRALI XOM ASSESSMENT AXERS STREET FROM 18TH STREET TO WATSON STREET PAVEMENT CONTRACT DATE CLA B COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT Ah CONTRACTOR FT. ROADWAY 1' PAVING RATE PER FRONT µ F.00T 1.76 Based on ' Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL MOUNT 1 I T 5 TB ST I X T 9 R 3 CT ON B O 1 I T A S T 1. E E T I X T E i S E C T 1 0 N R T T ET I TEFL 3 E C T OH Arnold Ocka r (n) olenda]e 1 9 -10 100 1%.( Lorraine Ocker (E) * 1 7-8 100 176.00 E_ N. For (E) " 1 6 50 80.00 Ross L. Allen (E) " 1 4 50 88.00 Russell R. Dnncamt (E) " 1 3 50 88.00 BALDR I I BL6 D, I T !E E ENE T 1 OR Sab-To 350 b-Tota 616.00 PII RI_IC WORKS DEPT .._.. .. I vv.v w ....... . ENGINEERING DIVISION �� Tt COMPILED L.H.T. CHECKED E.L.S. SIIMALK ASSESSMENT AYERS SST FROM iSTH STREET TO WATSON STREET PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER SQ. FOOT •44 CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT :FOOT 1,76 Basted on 4' Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT IUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AM OUNT BA DWI 1 H V D. I NT ER SEC TI0 N D A H L I D I I V E INTEtSEClION E R N D R 3.V E I T B R i E C TO N Ben H. Livingston (E) $04thmoreland 1 12 139095 246.31 M. G. Derrtok (E) .1 1 13 139.95 2 46.31 K 0 S A R S T R E E T I N T E R S E C rj 0 N Ray hest (E) " 2 12 139.95 246.31 Laths Agnew (E) " 2 13 139#95 246.31 C R T E S T R E S T I UT _ R SEC — TI ON ►. G. Guaman (]3) " 3 12 139.95 2!16.31 �. P. Givens (9) " 3 13 139.95 246.32 TO m p x I g S S T R E 9 IN ER SECTION b-T 839i7 Ssib -Tots .87 .. .�.. .. vnno v..r ., CORPUS CHRISTI , IEw, ENGINEERING DIVISION , COMPILED L.K.T. CHECKED S.L.K. SIDEWALK AYERS STREET PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Se. FOOT •h4 ASSESS!!ENf FROM IM STREET TO WATSON STEM CONTRACTOR T. ROADWAY PAVING RATE PER FRONT FOOT 1,76 Boo" on 41 Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER I LOT 'NUMBER I PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT T H 0 It P K I I s Z TREST INTERSi CT I 0 Sallie GoParth (E) Scmthmorelani 4 12 739.95 246031 S 11 E L I S TE S E T INTERS E CT I O N Ross L. Allen (E) N: E■ Rtrb! - (,.T -•• Southwreland 5 NJ 12 69.95 1234-11 N. Z. S (N) SouthmorelauR 5 13 69.97 123.15 O,R.BdC.B.dehnnorl (S) " 5 13 69.97 123.15 Z 0 4 A R D S 3 I R E S T I N T R S E C T I O R Crystal Petroleum C0.01) Souttwlareland 6 12 13905 24641 R. R. Jones (E) " 6 13 20 35.20 T A R L E T O N S r R E E T I N T E R S E 3 T I 0 9 - Phillip x"Nad (E) Southumeland 7 12-13 279.90 492.62 B L E F I NS 3 T 1 E S T I NT Z R S EC T 10 N Helen 0. Smith (E) Seuthmorelsnd 8 N} 13 70 123.20 R I CHI A R D S T R E E T I N T E R S& C r I O N Uri 111ZIT 9firyff rITIFFTruorTuir Hanel Calvin (E) Southmmeland 10 13 139.95 246.31 S O N STREET N T O N PIIPJ M WORKS DEPT Poo Disc - - r � — - - Sni-T ENGINEERING DIVISION �� COMPILED L•K -T. CHECKED E.L ,.S. TARLBTON STREET PAVEMENT CONTRACT DATE__ CURB COST PER LINEAL FOOT - SIDEWALK COST PER Se. FOOT 44 SIIiENALK *W ASSESSP "ENf FROM NAPLES STEM TO Arms STREET CONTRACTOR . ROADWAY PAVING RATE PER FRONT -FOOT 1.76 Based on 4' Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER INU.MBER LOT PROPERTY FRONTAGE PAVING COST SID EWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT N A P L L S T R E& T I N T R S E C T I O N Julims Wahlberg (S) Southmoreland 16 1,2 110 191.60 J. 3 50 88.00 LH.lP.e Af (S) " 116 6 X65 188,000 John J. Boulder (S) " 16 50 0 BiU7 W (S) " 50 89.00 Eva 16 8 50 88.00 C. A. Bro=* (S) " 16 9 50 88.00 John C. Bishop (S) " 16 10 50 88000 Darin A.�f Singleton 86000 1e0• L. " 16 2 5D 86.01 L 1 W I S S T H E E T I N T E it S F, C 1 10 A 0. E. Bolin (S) Southmoreland 7 1,2 100 176.00 1 - H. lbegle (S) " 7 3 50 88.00 3eeeli.a Kelly (S) " 7 4-10 350 616.00 Philip Massed. (S) • " 6 11,12 IM 176.00 A 1 $ R S S T 8 E E T N T E A S E C T I O N b To 1210 b -Tatal 129.60: PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION COMPILED L.K.T. CHECKED E.L.K. i �) A. A SIfAjdC : ASSESS "IENT EDWAM STua FROM "PLO 3TMM 70 Ayggq STgZXT PAVEMENT CONTRACT DATE__ CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT CONTRACTOR . ROADWAY PAVING RATE PER FRONT :FOOT 1.76 Haaad en k' Nidth SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST IAMOUNT TOTAL Et I L E S ST A EAT I ETE t SEC T ION N. B. Rosa {N) southmorelsnd 18 24 6a 105.60 C. A. Johnson (N) " 18 50 88.00 Lillian Urban (N) 18 22 50- 88600 Nova Ise motes (N) " i8 21 50 88,00 Mailaine 8. Waller (N) " i8 20 50 a. 1. Wyatt, (N) 18 19 50 88.00 88.00 Mable L. 6 18 18 88000 L. J. Pol",kk (N) " 8 17 550 0 88. 00 ROzy YsConmll (N) " 8 16 50 88.00 F. C. Tompkins (N) " 18 15 50 88000 L. A. Rvjd)U (N) " 18 14 50 88000 N. �. Hoss (N) " 18 13 50 88600 LE — IS STR 9 TT INTERSECT — — — — 1 ON — N. H. &Irkstt (N) Southmoreland 5 23 #24 100 176.00 Owen F. Howkn (N) 5 22 5D 88.00 a. J. Isaac (N) ° 5 21 50 88.00 hugust HerovA7 (N) " 88.00 Steve Haggis (N) " 5 TP18 155b 2611.ao �. R. Heater (N) " 16 50 88600 w 88.00 1.H�deCpB.dohnsoa(N) " 5 13-14 110 193960 AI RS STR ET INTERSEC? 28 PIIBI Ir w .. .......... ..� ..UK— vnnioii, 1CHAS ENGINEERING DIVISION I ., COMPILED L.K.T. CHECKED )L.L.A. a a B C a S 9 B P ENGINEERING DIVISION PAVEMENT CONTRACT DATE CU713 COST PER LINEAL FOOT SIDEWALK COST PER Se, FOOT PAVING ASSESS -TNf 1r�H.l;AW jggalj$ FROM PC>2[T A9ENVS TO AIRPORT 1"D CONTRACTOR FT= ROADWAY ING RATE PER FRONT 'FOOT 1.76 based 00 4', Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT •NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT, SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT BIAS Eghuw, Dept. �Jlj oe Garza N lyre *=Mott Tract La Palowa 4 PORT 311111 1 R T R R S I_q_t. L0.11 899.00 139.04 1 310.80* 791 asst Frank ( La Palow E 2 G I N 13 T R 3, & r Ig E R a 1 0 T 1 0 166.32 3-4 44.5' one Hord ( red F. Morgan (N) mum Farriaa.Jr. () " " " ^ 1 1 1 BIT Li r s r o 83.16 166.32 83.36 4 2 -3 I 47.251 94.51 /+7.25 manita Plats (N) . 0. Bernandes ( La Bahia ) " " A A I N Aj S T R LLJ N T B R ,8N CT 0 86.52 86.52 18 19 479-591-1 49.16' inception R. Flores ( W. Snablauch ( Ld H. Foreman ( 9m Breslau ( La Bahia • • J. P. Connell Farm J. B. Woad SS P B B ota 1 I N 0 S A. S T R 39 T IN 0 26.40 73.80' 545.60 200.39 2 1 5 15' 41.93' 3101 113.860 R O 11 R W ol 0 D 4 ?.R I I T I N T I R 6 B C 1 I O 4051 merth G. LiWeland () Lindeland tract 712.80 x A If 19 A N2 3TRILLI R I O N 0 GS SRSBS IN =RS C f0 UBLIC WORKS DEPT., CORPIIS CNRI.gTI TFY— •03 SOH TOTAL - 1t857.4i1 COMPILED LIT CHECKED JRC 6/22/50 PAVEMENT CONTRACT DATE CURS COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT " PAVING ASSESSMENT MM..1 .37M FROM Ion." CONTRACTOR ROADWAY PAVING RATE PER FRONT FOOT 1_76 LQSBd DII L1 width SIDEWALK RATE PER FRONT FOOT I PROPERTY OWNER N NAME OF ADDITION N BLOCK L LOT P PROPERTY P PAVING S SIDEWALK S SIDEWALK C CURB C CURB T TOTAL 08A I I E a T T RIIT I I N T j 1 1 R a E 4 T T 1 0 N 'elry Q. ]shoe (N ) M Meadow Park 2 24 1 1 2 2101 3 369.60 MOH W WNC 3 3TR,EIT I IN E ERa 1 C CT1O 5 A L�Vlj B BLVD I IN? R R3Z T TION 1lAm M. NNaters (N M Meadow Park 2 25 1 1 -2 1 1521 2 267.52 Wry Andrews Rauch (N " " " 2 25 1 14 1 152' 2 267.52 CHE I I INNI S ST1112T I INTERSECT I I O ON lazy Andrews Ronda77 N M Meadow Park 2 26 1 1-2 1501 2 2+4.00 kly F. Gollxrlsy. (N " " " 2 26 1 16 1 152' 2 267.52 iIR G I IN IA 3 3TI It I IT I N NT 2R 3 3A CT 3 0 0X L R. Nlaskiee (N M Meadow Park 2 27 1 1 -2 1 1551 M Mac NIA N A AT NA 8 83$ 11 I IT 3 N NTIRaICT 1 1 O ON kmagio W #ns63n n 12 2 29 4 43f 7 75.69 W odri ( n 1 28 4 431 7 75.68 1. E. UldR es (((S " " 2 21 2 27 4 43' 7 75.68 Intonlo R. Rmoa (N) " " 1 11 2 26 5 50.67 8 89.18 3 1 A l li NI a aTRIIT I I I I TER E ECTI 0 0 N tslesstra Re7m (N " " 4 4 3 34 4 49.031 8 86.25 PUBLIC WORKS DEPT., ENGINEERING DIVISION __... __ _....._.. ....v... snb 'total — 1. 291.71 dal 3v 3a.r fR�RlJ.J7 COMPI LED LST CHECKED JRC 6/22/50 PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER S4. FOOT 044 PAVING ASSESSMENT FRO!A POST A9RNUB TO ADPW ROO CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT :-FOOT 1_76 lho„� Rm 4i V9dth SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT Sea Leal (i) Dartola lbrales A AUSTIN r 4 4 A 30 46' 49.031 80.9 816.2 _ to Garza Anita Qerea tN Tito Sandoval (N� Salnstriano Aewa(N) AUSTIN * 2 a 165.3 76,6 89.6 3 3 3 37-38 335 34 9392 1,31 50.911 A 1 0 O A r $ T 10 W., X. Lana (N) Jose Mandes (N) Ruiaeia Ramirez N Hilda Rtirton (N Rnearnacion Herneea nd L. L. Woodman (N) AUSTIN 02 a ■ ° a r a I ° III a G U A T RK' 43:86t 43.85 43.6f 124.61 ' Z R SE IC T 125. 77.1 76.4 77.1 76.7 219.3 i A A A A A 6 7 b 5 4 L. L. Woodman (N) L. L. Woodman (N) AUSTIN #2 a r 9 SD R R Restan II 7]44 ,12 ad 132.45 R T 200.8 233.1 D AIR F OR ROAD I H 1 SIIB $1,659.3 PUBLIC WORKS DEPT'., ENGINEERING DIVISION "US'CHRIST1, TEXAS _ SUB TOTAL - 942.99 -_ COMPILED La CHECKED dRG 6/22/50 PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER S@. FOOT • PAVING ASSESS -IENT QQLW" 3TMT FROM 1"h TO 220d. 8 T R E E T CONTRACTOR ROADWAY ING RATE PER FRONT "FOOT 1.76 based cal 41 Wiftk SIDEWALK RATE PER FRONT FOOT OWNER NAME OF ADDITION BLOCK NUMBER LOT •NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LI N. FT, SIDEWALK COST 'CURB LINe FT. CURB COST TOTAL MOUNT © �PROOPERRTY �. �• "r.V t.yr �yS . 52.80 bra H. do Garcia r 2 25t Fict©ria Ruiz ($ r r 3 ' 6I4,.00 wc lbrales, dr. (8 * * 4 25f "1w faaaa7 R. lforales� 3 r +' 5 25 = 44.00 %blo l a%apdr. 6 " r 6 25' 44.00 kdogio mnU Isl s r • 7 251 44.00 wronim Banda S * r s 25t 44.00 III plE Alvarez r r 9 25t - 44.00 d1barto Fiorar j a 10 25t 44.00 4miola IS ' 4000 kria o"chola 12 259 4.00 bia Tarr" S r 4.00 Ire. A. do lhmto s 34 z � x.00 van A. Re drigraa (s) r r 15 2• ".w oaa@He0 U 16.37 -j' 50+ ".w p0 oboric 25' 44.w 0. dgl=wlwl s • r 19 20-21 2.42 44000 minv C. Etaraa 11 6 38-142 324.6* 92.26 9.24 on of r wnmc n eeD ,156.35 ENGINEERING DIVISION COMPILED LEr CHECKED d80 0/23/50 PAVEMENT CONTRACT DATE CURB COST PER LINEAL SIDEWALK COST PER Sq. FOOT •�. PAVING ASSESSMENT FROM 19TH :0 2.4lF>f. 3V= CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT 'FOOT 476 based on 6' WldW= SIDEWALK RATE PER FRONT FOOT rUSLiG "ORKS UtFI.1 CURPUS CHRISTI, TEXAS MIB TOTAL "51 ENGINEERING DIVISION - n�. COMPILED Lgr CHECKEDMW- 4 /" /y>t - BLOCK LOT PROPERTY PAVING SIDEWALK SIDEWALK CURB CURB TOTAL PROPERTY OWNER NAME OF ADDITION NUMBER NUMBER FRONTAGE COST LIN. FT. COST L N. FT. COST AMOUNT arisoita ovalle (8 anal" ❑.boos H *pirfm Bwma s (N mundo Garza (W bronado Fero 6 esaro V. Flares (F Summ " w " " " 6 6 6 6 88.000 6-37 35 0 5 5pE 50* 3 75! 7rmv 50' 88.00 88.00 132.00 .� 176.00 0 i Hula T. BDSiagu n (S lartera Goovara (S . G. Gumam (S "erlden Flores (3 edro Nots at al (s) c'sea Hernandez (S) re. Ross ((N . go Cabrera (bi) am>nle F. de ra• Teodera do rs. lbensgaa de Isar pe Fe Sven (N 311ee'tre ArIDBdilla (N SbilGM " " " " " " « « ) " « 8 8 8 8 8 8 8 g 5 5 5 5 -2-3 4 5 6 7 8 13. pt•9: 750 251 251 251 25e 9 351 s�i 251 250 501 500 50; 132.00 /,4.00 46.00 46,00 46.00 61.60 123.20 88.00 .00 ".00 88100 88.00 "000 2D 19 17•x.8 15-26 12 ITERSEClION TOT ,680.80 rUSLiG "ORKS UtFI.1 CURPUS CHRISTI, TEXAS MIB TOTAL "51 ENGINEERING DIVISION - n�. COMPILED Lgr CHECKEDMW- 4 /" /y>t PAVEMENT CONTRACT DATE__ CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT P4 A: 81 M! cl h BE Tc lb Ze Me No Yi PAVING ASSESSMENT- KIM XnI=T FROM Vn 1928. CONTRACTOR ROADWAY PAVING RATE PER FRONT 'FOOT 1•%&4ftwe&-cn ** vubb IDEWALK RATE PER FRONT FOOT PUE3LIC WORKS DEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION i MW TML 1,060.21 COA9PILED CHECKED_ BLOCK I LOT PROPERTY PAVING SIDEWALK SIDEWALK CURB CURB TOTAL PROPERTY OWNER NAME OF ADDITION NUMBER NUMBER FRONTAGE COST LIN. FT. COST LIN, FT. COST MOUNT LmUn (V I�8N e firio Cm � �l t 52.8 am Chapa fS n " n -part 201 35.2 3ph Traje {8 IB 7 18- 325 1 220,0 berto Medreao (I " n 9-+m 1 176,0 an Trorim (N " R 324 1 .f1 88.0 CMRCH or clal T Ill am (ll nua or= (g) n " R " 26 5501 88.* nd l.w1A 'a (x 0 -. 27-49 1 W.01 1�1 376.* @,�_ ( !>aeiee0 8epeaeaa (g ST & LAiFGILIY 2 sable G. Gos a3ae (S R " n 3 50.161 88.2 rs X. Rarrara S " " * 4 50:161 88.21 Uto A. Garcia S " " " 5 50,161 Cagoea Garza (S) " n R 6 50.361 88.21 r flrehemaii (3 " " " 7 64.41 88.21 r Crshanaki 113.3'. dr leeata A. Roigmm(N) Cl2Wn3N 17 8-9 1501 88 .OL j 808 TILT 411865.91. PUE3LIC WORKS DEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION i MW TML 1,060.21 COA9PILED CHECKED_ HART STRECT PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT PAVING ASSESSMENT FROM MOWSKS TO 19TH. STRW CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT :FOOT 1.76 biased En 40 Vidth SIDEWALK RATE PER FRONT FOOT PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISIONi.^`S*, COMPILED Li'!' CHECKED JRC 6 W ICI 20 20 20 30 DO 00 m DC 00 DO 00 Elm " BLOCK LOT PROPERTY AVING IDEWALK SIDEWALK CURB CURB TOTAL PROPERTY OWNER NAME OF ADDITION NUMBER UMBER FRONTAGE COST LIN. FT. COST LIN. FT. COST MOUNT Ben & riotor Garza � 17 10-11 5O' 88.6 Lao. L. Lopez (B W 17 12-15 1.05.9 186•.' Joseftm (luarsera (B 3,= PLACE 12 R part 401 70.1 Jao. rianmwy Est. H ■ R 12 t soil 140.1 16 Ii. 3 R S E " Joseph Rwh 1 Hm PLACE 11 8 patrt 401 70,, 1. L. RuVF E N W 1�1� v part w 140.1 L. raffle Eat. is N R n 7 2w 211.0 Rafela Brae les {!S " " 24 lw 2n•' Jearm ?above t,E " B 14 �1y 12 �' �.' !!aria oillereal (9 Wm PLACE 15 1 1• Chnroh of God in (if) " " 20 6 80' 140. Librado Garcia (S LURE 9 1 25' 44.' Pedro A. Pastas (6 " 9 2 254 44. Radial D. Castillo t$ " 9 3-+4 501 �•' 3. S. Baltsaar (S) " 9 5 254 44. Gaadal -W Castillo (11 " 9 6 25r 44. Sixty 9rruttla (S " 9 7 251 44. Canters martinet (S " 9 8-9 w �- 1,1.80.9 PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISIONi.^`S*, COMPILED Li'!' CHECKED JRC 6 W ICI 20 20 20 30 DO 00 m DC 00 DO 00 Elm PAVING ASSESSNENIF PAW STRW FROM =OWE= TO 19tH. ST88ET PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER SQ. FOOT_ 0" CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT :FOOT 1076 t7aaed DR 41 SIDEWALK RATE PER FRONT FOOT PUBLIC WORKS DEPr., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION COMPILED LU CHECKED as 4413 1 +act BLOCK LOT PROPERTY PAVING SIDEWALK SIDEWALK CURB CURB TOTAL PROPERTY OWNER NAME OF ADDITION NUMBER NUMBER FRONTAGE COST LIN. FT. COST LIN, FT. COST AMOUNT Fee= Svltazar (s Lim 9 10.11 501 BB.Oc EatuAl o A. Yilleps S ■ ■ 12 271 47.5,' luenita S. Gennalee 1XIN * 7 1+2 5(11 MILK lntonio Gang m " 7 3 25* 44.00 'ar#ha Palae>1� + 7 4 251 44.0( lmlito Soto (x ti 7 5 251 44.0( .Pablo N. Juarez (M " 7 6 251 44.0( r1bureia X d e Trivim() " 7 7 251 44.00 LrOUID Lem Y " 7 & 501 98.0( Lppitc Torres s in 7 10 251 44.06 tamon Rivas " 7 1142 521 91.5< T urm n Rivas (S LUTER 10 501 88.0( Itm n Garcia (S 0 10 501 88.0( Latta G. Martinez (S " 10 501 88.Ac Was3md> G. Martimes S " 10 251 44.0( 1. S. BOWM 8 " 10 951 167.2( tacos 81vas R JASXli= 38 Iwo 211.2E :omoepeiom R. Casares() " 1 2200 211.26 SU TOTAL 9891 an $1,564.6A PUBLIC WORKS DEPr., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION COMPILED LU CHECKED as 4413 1 +act RRD'A1 M BUD. PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT rl SIDEWALK COST PER Sq. FOOT .w► - Prf B, d: C. BY D. J. 16 PAVING ASSESSHENf FROM MRQO AVENUE TO BLTFP'AW STR.M CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT : -FOOT 1.76 based on ,4t wIM SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN, FT, CURB COST TOTAL AMOUNT �� �� . P. s Litt Tucker a emm ah'a ulth )e D. Browning a A. Maynard Is L. Rucker, (s r A. He Whin (s ra. -WA6 Raaaoe (a AU VIEW �' r R r r e r r a r r r r a n r- r r r � 14 15 16 17 1$ 19-20 S 0 1A7 c2F 88.0C 88.01 8$.C( 18.0E .0( 88..0f 183.1x4 4 4 � 4 4 k 5� t 502 501 5011 501 501 1041 � E (z G. Gravest s lo, W. Evans s V. svesre (a ank Riacoa B T. Sparks (s BAr Y�d #2 r r or � r r r r r r r » 92,5 44.25 46.25 46.25 46.25 46,25 46.25 362.80 B2.8C 81.4E 81.9 61.40 81.4E $1.40 5 _, 5 5 5 5 5 5 9-10 3.1 12 23 2L4 15 16 E. StePheas ) a. V. 8. D11ard a BUT a 84.4A 82.72 47' SUB TItAL — 972f SUB 41,710,72 PUBLIC WORKS DEPT., ENGINEERING DIVISION CORPUS GhRISl1, TEXAS COMPILED j.r! CHECKED lgr PAVEMENT CONTRACT CIR B COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT .44 1 1 t PAVING ASSESSNENf FROM CONTRACTOR T. ROADWAY PAVING RATE PER FRONT PFOOT 1.76 based aa-49 Wldth SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER N NAME OF ADDITION N BLOCK L LOT P PROPERTY P PAVING S SIDEWALK S SIDEWALK C CURB C CURB T TOTAL )iaarim piarw Z M My V= ,112 6 6 7 71 � 47� � 1. Ymax 1t 4 6 1 12 4 47* 8 �,� WOW Jar 1s * * w s 6 47` 8 82.72 4 8a11aas $ + +� R W 6 6 4 47* $ 82,72 fan. E. sabout S W W n R 6 6 1 15 4 $2.'1"2 WILL© 11 lareal B W W R 0 6 6 8 26 4 4" 8 82.72 �. +. aAra'asa W n n n ■ 7 7 7 7-8 2 82.72 & late A. 01aea( M M W W 7 7 6 6 4 471 1 167.72 1?/la w 7 7 5 5 4 472 8 82.72 1 �� 7 7 4 4 4 471. a 82.72 � awence R. QrimigY i) 7 7 3 3 4 471 8 82.72 bra T*MW 7 7 2 2 1 1 $ $2.72 oaa ?., W3113nan (W * * R W 7 7 I I 4 471 8 82.72 $2.72 D. A<IaBaeaat(?Z 1 1$60LY8 2 H & 0 0 8 8 8 2 9 912 2 200 man X D LUTH „801D g 2 7 7-8 2 2005 3 332.00 Ulm X. Godlass 8 L gT. 7 71 7 7 4 46,1, 1 176.00 sd argarlta Gaaa (8) « « R v 8 21 . . 5 2 23.05 4 81.13 abnllga Ga2ioa (E) W W n N 2 5 2 23.051 4 40.57 one M.. vLuw *®al (B) n n. a R 5 11 4 4 4 46.1 8 40.57 81.74 SU TAW, 3 3 3 3 - - 4 41,931.25 S P OR S DEPT., ENGINEERING DIVISION COMPILED LU CHECKEOM! 1,/,3114n Me all J. 9. Ci Mr Mr do iQ Ju A. Pr At Me Jo Or PAVEMENT CONTRACT. DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER S4. FOOT PAVING ASSESSMENT awmimm BIRD. -_ -- A== 20 210?AL0 8211M CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT 7FOOT 1.76 bassil on 41 wlM SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL MOUNT a. Zieal Noland lot. afia I�runsa (E) T. Pr"s (W BBTHOLIfD " " C A4 3 194.15 132.00 332.'00 4 3 2 1 1 110131 751 751 as, Comm (3) Haai:ss (B) 30THOU AHD PAIL �T L29.29 317.29 1 9 .Pi $ .prr 6 ","1 as. N. Routhin8sr (8) " " 9 7 3.401 246.40 'a. Jeanette Raffle(w) S. Jeanette laffis(N)) wfma AND PAIR. C01RT 2 8 1 1-4 -1C 71.21 2101;,. 125.31 369.50 0 at '1. Geansales s PAIR. COLI�ZT 3.4 14p 246.40 iaso 931lsasnDi t� 34 7 3AOO 246.40 I an Montss (8) G. Garza (E) ions " 228.80 88.00 3 3 5 7 73O* 50' W* & Morris Breslau rabss+ Braslan (Y ) " " 3 4 S 1 1301 1301 . 228.80 22.80 .A. Onrrls. jW11 ae a.sas Bat. W) a. Carl F. Allucher(W) " " " 4 4 4 14 .P.33 .P•13 501" 501;, 801 88.00 8ffir00 340.80 M 31 0 SUB TAL - 1.721.51 as $3,030.04 PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS - ENGINEERING DIVISION \'f COMPILED Lff CHECKED JU. 6/230 PAVING ASSESSMENT' nOwsm HL11S. FROM MOLGO AM= M Wr!'ALO BMW PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT ." CONTRACTOR FT. ROADWAY �L PAVING RATE PER FRONT :FOOT 1216 based as 45 wig SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT - UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN, FT. CURB COST TOTAL AIMOUNT kite Samara (W . Y..HOlmom (li Latcr oliasr" (w wu Martlnea Hangsl(w Wort Garcia (H radaly" slain" ((61 "ee M. T1124real (ii a a ) " SODTH in SIT. • " " 3 3 3 3 3 20 10 1 2 3 5 6 2 3 50' 501 50x 50' 50' 45.811 45.51' 08.00 88.00 88.100 88.00 108000 80.63 80.63 oois.lorta (S) . G. Garaa S rthuro Culanwo m1� Gutless MU Medina izwwl SOUTH SND SZT. a a ltOaR78 t M1TC SOUTH SHD SxT. " • " 81.56 163.12 246.35 81.06 162.13 4 4 9 5 5 4 -5 6 1 2-3 541 92.68) 139.97' 46.06' 92.12' Lam Ganaales (S� . Medina W 8. Baleen B) aid" soz S) Lora Hill W) � k a a STSSLB & LAUGHLIN a a a a 1 S. } 6 1F. 6 S,part S 247.68 246.40 131.5E 113.75 4 5 4 4 5 1W. ' 140' 74.75' 64.63' la Lsdin (iI) a a 5 N. 1 par 451 t 79.20 1 95' 167.20 AL 1,338.9 SOH $2o321.27 SM PUBLIC WORKS DEPT'., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION COMPILED__IJM_CHECKED jn W2vm PAVING ASSESSMENT- MROWUM BLVD. FROM HaRW AM= TO WFAW PAVEMENT CONTRACT DATE CI.RB COST PER LINEAL FOOT SIDEWALK COST PER SQ. FOOT Oa R. Jib Re On7 T40 T44 I. E. CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT "FOOT 1076 'n"a an 4� Wl*kb SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL MOUNT f h Idea Dati�: W) * uol 1181 1°7.69 207.69 2°7.68 18 It 17 16 ul 8�aa (W • 113 2/.68 2017.68 3.4 17 32 17 fin P. nato, TR. tS� Ulrlem Qdi'OE (W C=TAAL WN-6 W=- • • M 1 528.fl0 266.00 3D 33 1501 fl 8 f 011 0D®panW (8) ;.-bz. R.R. W CUTHAL WMA WB�. • • "o.C° 440000 ,79 34 8-9 1-8 2 2701 - Hex. R. R. (W) • • • 28 1204 2].1.2° a �• �"W k Era Ool��a E R. Harkins $ • • X4.0° 264.00 264.00 6 6 2 4 9 1501 1500 1500 sm T 0521 SUB ml� - $3,611.52 PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION - ; ��.`y COMPILED LZT CHECKED JRC 6,/23 50 UWAUZ RM. PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER S4. FOOT up aM ®o A 94 b. CS A. An Al: da A. A. A. A. PAVING ASSESSMENT X"A AV== TO =YAW MW CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT -FOOT 1076 1mm" am 4'1 llldlh SIDEWALK RATE PER FRONT FOOT ERReTY OWNER NAME OF ADDITION BLOCK LOT NUMBER UMBER PROPERTY FRONT1AsGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL MOUNT osP.R,,O_P— "a vriseal ut. � dwiao (wi a Jahasan (w) A * 88iW 52.80 246.40 Z71 _ r � 300 � $. �a�att (&) 49 of Oerp" Lta (w Lana Gamma, a (Y s.ffi. Lipeada (Si w�sr � a • • R w R * Sa '.*1 . 41P 4w 481 88.W 42.24 40.4o 84.48 3 7 4 13 4 12 4 ll . 81.iet: (s 8. ffiafits (li� Numm ■ 299.253 299i2k? 2 2 1709 M B _ H. H3itets (W) 41 44 149.60 1 l $310 854 90F 808 TIC UL 1>,3 808 - $2,302.08 PUBLIC WORKS DEPT.' CORPUS CHRISTI, TE%gS ENGINEERING DIVISION COMPILED W CHECKED 4/2, C56 PAVING ASSESS�ENf PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER SQ. FOOT CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT :FOOT 1.76 hamg a4 41 width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT foam H. JU319 (V) RAY VIEW #,2 3 2031 181.28 robe Z Ray' W a r a 3 7 501 88100 3%ella Stlaeon {W 3 6 501 88,00 P. 1. awff (W a a a 3 .5 501 88.00 Manche Leo (W) " a a 3 2 501 88.00 hople Beth -e1 a a a 3 1 531 93.28 :. B. WasbbWn (S) folm H. Down (B) GAFPKU 1 " 1 1 16 17 82.72 82.72 47t 471 (aria Ro&lgws (s) a 1 1S 471 62.72 .harsh of Christ (W ) ley Yisw lit 2 b 46.2$1 81.40 foe B. Rene 4W a a a 2 2 46.231 82.40 1Tlatre AbelQ4 `W a " " 2 1 46.251 61.40 gal IDTOL X1.115.92 PUBLIC WORKS DEPT., ENGINEERING DIVISION. CORPUS CHRISTI, TEXAS TOTAL - 635.751 ,_. - WMPILED L11' CHECKED nG PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER S@. FOOT r' 0 A T M B B W R R F R t O r. MI E. PAVING ASSESSMENT lllh sy= FROM 3D= To s CONTRACTOR FT. ROADWAY NG RATE PER FRONT :FOOT 1.76 b&EjjTSam J1 Vidth SIDEWALK RATE PER FRONT FOOT PUBLIC WORKS DEPT., ENGINEERING DIVISION _. sm TOM — 1,031 -.., CITY 3301 COMPILED T_!_CHECHEDJac rtv BLOCK LOT I PROPERTY PAVING SIDEWALK SIDEWALK CURB CURB TOTAL PROPERTY OWNER - NAME OF ADDITION NUMBER NUMBER FRONTAGE COST LIN. FT. COST LIN, FT. COST AMOUNT B 0 0 M E L11a 0. Normal E Huals 3 22 $01 88.00 4 In ape E " 3 19-20 501 88.00 w"t Weber E " 3 ]A 251 ".00 T. 1taaleit,3r. E " 3 1617 50' 88.00 Atle J. -ab al"t E a 3 15 251 ".00 r. R. W. HOter (W Bay Terrace 42 1002 4001 844,80 EL S E O W. Moore (E norm 88.00 1 a-22 501 alace Franke E It 1 751 132.00 C. Braa]ae (E IN 1 16-17 501 1 88.00 E. Bi ll lmk (E " 1 5. 751 132.0D E. Fitch E " 1 0-11- . 2 751 132.00 NWR 1pp1ewi13tf E " 1 5-9 1251 220.OD red F. Morgan (E * 1 1-4 1001 176.OD Lty or Oorpoa Christi() Bay Terrace J2 901 330* 580.80 W. Womack E Beysiev 15 ,32 1531 delyn Womack ]K, 15 14 501 W.00 J. Benton E " 15 15 501 88.00 8aB X3,190.88 ��� „ I of w eh #58D is City Pro PUBLIC WORKS DEPT., ENGINEERING DIVISION _. sm TOM — 1,031 -.., CITY 3301 COMPILED T_!_CHECHEDJac rtv SZI]I3WAI.l +f ASSESSMENT PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT �kh CONTRACTOR FT, ROADWAY PAVING RATE PER FRONT - ->FOOT I_.% 16m&A = 41 114ft . SIDEWALK RATE PER FRONT FOOT PROPERTY .OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT, CURB COST TOTAL AMOUNT i r E R 6 S T R E E T I I T T E R 39 – C T I – 0 N - 7 Da n 2itchue - 803 - 1 5p 88,00 Phillip aae$ (E) 44.60 Clara . johnson(k) " 803 5 25 ` 44.a0 RW 803 6 25 Phillip Mso* d & Ike A4dman , (8) " 803 11-14 IW 24b.40 W. S. aw–Ahall (W) a 26,32, 8 1 wSYJ O.d. s.li4►tAS �%1sOn (YY) " 903 I75 ' 1764,w 22211 T H E 8 T I N T E R SE C T I – – O N' – Mrs. S. J. T yU*,8r.( ) Sooty & Allen 4 9 50 88.00 Barnett Constr. Co. (E " 4 7,8 100 176.00 Gay (E) 88.00 �y,� Ellen S. Pape ' "Y° (F ) 4. 5 50 88.00 Barnett Constr.Co• (E) "" 4 3,4 100 176.00 - Mrs. R. L. BruaarootC�P xugl,ei 4 23,24 50 88,OD Jas. A. Webb (W) 4 25,26,,'7 75 132.00 32aOO Iva Tribble (11) " 4 28,29 5D J. M. � (N) " 88.00 ankmwn Owner (1I) " 4 32 -36 125 22OeO0 OONTI ON I 1v um E) b-Tottl 1140 Oub-Totaj 12006,40 u6la ,um ma ucrl., CORPUS WNRIOII, TEXAS ENGINEERING DIVISION COMPILED L_g_T CHECKED _j_p_r_ SIDINALK XMU ASSESSMENT SOUTH ALAX= 3TRnT FROM AMS STREST TO HANCOCK STRSBT PAVEMENT CONTRACT DATE CkR S COST PER LINEAL FOOT SIDEWALK COST PER SQ. FOOT CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT 'FOOT 1.76 Based on bx Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT, CU.VB COST TOTAL AMOUNT +• D. Batg*n (B) H+ighes 4 371 50 88100 �rrrst Hunt (N) IN h 39-4', 100 176.00 9 L 12 AB9 H THEE I11 Ir ERS 1 CT I0 t. K. Scurry NO Booty & Allen 1 10,12 8D 140.80 Ent. Srotherbeed )i B1ec.workers #278 " 1 1,2 100 176,00 P. L. Da+"ntanar (B) Hughes 2 31 25 44600 Caul Al"pla (B) " 2 32 25 4600 K". B. Am" (B) " 2 35 25 wt,00 First ivang, Lathsran Church ° 2 3 125 220.00 M 0 G A B A V N U R N T E R S E C I O N 44110e1 Prado (E) Bar View 13 ll 53 $ ®9a kris de loe Santos (E) " 13 12 50 '8.00 9. L. Coats (B) " 14 10 53 93.28 1. C. Brister (1) " lit 9 5© 88000 1*0. A. Gassy (w) " 14 L 50 88400 looliey T. Hamel(W) " 14 3 50 88.00 C IR A 1 0 A V E N U IR I N T Z I S E C 7 I O N B r 9 R D AV 9 NUS 1 NTER8EC M 0 N Fortino Doses (8) Hay Nerrace 7 14,15 50 88400 :. C. Kawalik (S) * 7 12,13 50 88.00 bao 1 147,36 PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION ` COMPILED L.X.T. CHECKED J.R.C. Lf SOUTH STAPLES STREET AND FROM BUFORD TO AnRS STREET PAVEMENT CONTRACT CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT o44 SIDEWALK FFS'7TRC, ASSESS,! ENT FROM PAFUi AVENUE TO FURMAN AVEN M CONTRACTOR FT. ROADWAY ING RATE PER FRONT :FOOT 1.76 Bawd on 4' Aidth SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK P,iUMBER SLOT UMBER PROPERTY FRONTAGE PAVE NG COS; SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL MOUNT Chan. W. Nelsen (W) Angelica Lippert(M) Qty. Title & Trust 00. Southend .� ... _. ■ E) * 6 — 6 5 � 5 5 —69-- 65 65.09 — 114.40 x+•40 JaneIbsrt (E) " 5 4 130.89 J. L. Scogin (F) C O L E M Shanwn _ N S 1 s R S T. I N E R 5 — C T I M 230.36 Mina suseer (E) 1 :70T 123 101 216.48 F U R M A N A ,7A E N U S I N T E R S C T I O N 177.76 $$!EFTS � REST fIffBST — SIOV Qsc. W. l,Y1ee (E) Chas. Nissan (E) Qeffn�T — — — — 4 b,17— _ 83 — — — 146.08 Fredrico Ruiroa (W) " 4 3 15 3 41.5 41.5 73+04 Katie Dunn {6{) CAAI Bw Viers — S? 13_ ER ; ` INT w0 RSE _ --- TIO — 73.04 L. M. Thew (S) 12 7,113 100 88.00 176.00 M 0 R Q A N 5 1i E E T I N T 9 R S E C T I O N Qulr ou cork. () ELiZZ4B Beety iiien Ta T� 21— — $T I — �0 T'E�! — rOT — ON 88.00 ( COA NUED ON THE T PAGE) Sub_T 915.98 Sub-To 1 1612.12 RK PUBLIC WOS.DEPT., CORPUS cur CS. RK CHRISTI, TEXAS L. .T. J.H.C_ u uVilsi ON -L N1 STEIMATt ASSESSMENT PAVEMENT CONTRACT CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT _1-11. CONTRACTOR FT, ROADWAY ING RATE PER FRONT -FOOT 17.6 teased = I,, gLdth SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK LOT NUMBER UMBER PROPERTY PAVING FRONTAGE SIDEWALK COST LIN. FT. SIDEWALK COST CURB CURB LIN. FT. COST TOTAL MOUNT �rx.. A.. A. Lippert (W) B001V & Allan h 18Ud9, 150 264.00 88000 It " 88000 Fr Re�llson (E) R " 3 g 88.00 il17.an 0. Smith (M) " " $ 50 B 0 0 T B R F B T I R T 6 R S C T I 0 x Annie Odom (M) Bay Terraee 803A 18 50 88.00 Ralph AD01s & Aaby Mitchell (�) " " 803 8 28.08 49.42 49.42 Raylmrd McMabb (1�) " " 803 7 28.08 Cl,� tt. da�ri (1�) 803 4 28.08 h9i�42 Mary Dann Moor (al) " 803 1b 50 88.00 Central Poem 6a Light zcmp (4) " " 803 la 120 2 1 *2D A 7 S R 3 3 R 9 9 T I M T A R 3 C T I 0 V sablat PUBLIC WORKS DEFT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION COMPI LED_L.X t CHECKEO_4.& nr_ PAVEMENT CONTRACT CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT 32[18Yi,I.A XMM ASSESS w 8DM STAPLES a7RM FROIA KARGUERM TO MM CONTRACTOR . ROADWAY PAVING RATE PER FRONT 'FOOT 1.76 bead an 41 V1d'h SIDEWALK RATE PER FRONT F00T PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST, SIDEWALK LIN, FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT M A 1-TRIJIT INIRRSZ i I 0 draban Hraslan Mamberlia 23 '401, 70.40 1.1 = Z T I I T I R S 9 C r 10 SUB MAL - 401 SO TOT LL - 70.40 PUBLIC WORKS DEPT., ENGINEERING DIVISION �.w -- -, I CAAD COMPILED .LET .CHECKED W %S0 A S 4 T A H x PI 9L A, PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER S4, FOOT PAVINC ASSESSF "ENT CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT - "FOOT 3'076 baeed CR 4, width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT, SIDEWALK COST CURB LINe FT. CURB COST TOTAL AMOUNT Bo sa lNTjR3ZC to 9 a 12-13 i4, 15 ma Cohn , Z. 03.een z Casan ®ieu » a =2 .. 2000, 176.0( 176.0( JZ) forge Taylor 2 D. Ecsran 8) C. Agan Est. 2) a a a a a n a a a 16 17 2U 501 , 50, 5501, 9$10( 86.0( 88.0( ►lent C. Hardwiaha (W v. M. E. RluW (W a a " a L 1 2 A B Z T H SIT INTXR SZ C4 101 236.6E 9(1.3( PARK OF 5L.341 se, C. Thomas (W) A. Riney (W Ini Hereon (W HAY VIEW a a n a 4,-5 3 1 0 336.9: 131.0E 248.4.E 9 a n j,9j."l 94448, ul.", A 3 a 12 _RD ]LUIR83clig th. $. collier (a) J. Anderson RV Nx view a a 34.5, 47.85' say, 255.2( 84.25 BtxB aL �s1,99�.9! -... -- — - • -- .... " .....,.. ua zvrsr - 1,A9�.'rf- ENGI.NEERING DIVISION �'�, s ..,,,, —, —*rte ,,,.�_..__ •.i.. �i..as.:.. SIDWAIX X09921 ASSESSMENT FLI7.ABETH STRW FROM SOUTI STAPLES STMT TO 11TH STREET PAVEMENT CONTRACT DATE CIR B COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT :FOOT 1.76 Based on 4' Nidth SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK I LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL MOUNT S0U4 H S TA ?L 9 8 _3 Ti ELT — I NTARSSC _ rl OR #• !�• Shy (N) Booty & Akan 1 lI 100 17600 6 0 U T 9 A L A M 9 A ST EET I N T R S E 0 — _ — T 1 0 N _ � — J. S. xelly (S) Hughes 4 44 139 2 444 Nathan reeler (S) 4 1 139 244.64 Chinch 4 Gospsl(N) ^ 2 23 139 244.64 J. T. Fow3ar (N) " 2 22 139 244064 1 0 T H S I R 9 E T I N T — Eft S — — C T I 0 — — — H — H. B. "ykemall(S) Hughes 3 44 139 244.64 O. W.B. Johnson (B) 244.64 J. Ralph Miller (N) " 1 23 139 244.64 H. M. Moor* {N) " 1 22 139 244.64 11TH S 1 Ab--I- R 9 9 T INT9RS 1010 C T 1 0 N job-Total 12131.12 �p� ". " "'I ;' 1.UK1Va GryK IJI1� ItAAS ENGINEERING DIVISION - r COMPILED L.14. CHECKED J.R.C. SID91ALK IWAM ASSESSMEN17 CRAIG STREET FROM OCEAN DRIVE TO 7TH STRM AND FROM 10TH STRUT To EROW PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT FOOT SIDEWALK COST PER Sq. FOOT_ 1:76 Based 9,0 Ll_ Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT iUMBER PROPERTY FRONTAGE AVI N6 COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN, FT. CURB COST TOTAL AMOUNT 0 C E A N D I I E I N T h R S E G T I O ioy iY. Jarb"Im (S) Bay Vpr 6 1 155 237.60 �• E. Halton (S) b 20 135 237.60 :aura Gentry (N) " 1 8 135 237:60 falter Fops (N) " 1 9 135 23740 2 N S T_ E 'F I N? & R S E C 71 O N S$ F I$ f RS1ai $N klm" Godahl {td5 Bov view 3 X1,/3 -9 45 796 20 I.N. math. Collier 041 " _; W113 -9 45 79.20 S A N T k F E S T E E T N T E R S E C Ir 1 0 x — g SNYRE- —TTIT r RSTE UY r6 jj ;reeetiz* A. Schultal (S Boy View 71 20 bT.5 118 :80 Lyra J. Bush (s) '" " 11 20 67.5 114.80 7 T S T R E E I N T R S E T 1 0 1 0 Y s7 it 11 771f 1st fiiS nth Rogers (3) Bahr Vier 15 1 132 232.32 1 1 T I S T t E Ts T I N T R S E T I O emple Beth —El (S) Bay View, #22 — _ ^ 3 — —1— 13-2-- — — — — — — 232032 . H. Stour (S) 3 20 732 232.32 (CoNaNUED N THE 1=T PAGE) Isub-Tol PUBLIC WORKS ULFI., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION '\y - COMPILED L.K. ?.. CHECKED J.R.C. SIDEWALK AAW ASSESSIAEN' CRAIG STREET FROM 10TH STRRBT TO BROWNS.SE PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT CONTRACTOR T. ROADWAY PAVING RATE PER FRONT :FOOT SIDEWALK COST PEA Sq. FOOT ►44 1.76 Based DA 41 Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY IPAVING FRONTAGE COST SIDEWALK LINe FT. SIDEWALK COST CURB LINO FT. CURB COST TOTAL 4MOUNT eloe #2 Riley ftitt (N) 2 V p.8 36 63.36 1 T H T R E T I TER E C T I D H Adds H. silson - - - - - - - - (1/3— s) Sap View 1#2 4 i 1t4 3�`2• - 232.32 0. H. Hamel -(s) l ( W 4 X1� 77..44 Nrry L. Garner (s) ° 4 44 77.44 lira. 1is. Raaooe f5) W 4 W1/ 44 77944 J. L. Harting (N) ' 5 B 132 232.32 E. P. mould (N) W 5 & P. 9 50 88,000 Joel S. x311ianson(N) " 5 V n. 9 32 56.32 Henry Brown (N) R 5 N P• 9 50 88«00 B R O IV N L B B 0 9 L& V A R 3i 3 N T E R 5 E C T O N Sub-T 600 Sub-Tot 1056.00 PUBLIC WORKS DEPf., CORPUS CHRISTI, TEXAS - ENGINEERING DIVISION COMPILED L-K-7- CHECKED J.R.C. 01, R. Ras V-9 lira Goo Goo Ras Bea Bu Job Lea PAVING ASSESS"IENr - - Bmpm 37um FROM S=ND $TRW TO 11th STR W PAVEMENT CONTRACT DATE CU7B COST PER LINEAL FOOT SIDEWALK COST PER S4. FOOT CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT .. -F.00T 1.96 based an 41 VIM SIDEWALK RATE PER FRONT FOOT ENGINEERING DIVISION \v �� ��� y� X77 COMPILED_LI�CHECKED JBC %/23150 BLOCK LOT PROPERTY PAVING SIDEWALK SIDEWALK CURB CURB TOTAL PROPERTY OWNER NAME OF ADDITION NUMBER 4UMBER FRONTAGE COST LIN. FT. COST LIN. FT. COST AMOUNT 2 1 342.51 y E. Riney (g) RAY TERV49 250.80 the Roscoe (H) SAY TRRBAM 2851 501.60 3 1 & A. Van Attsn A. baslsy (R) gle 8lmmans (s) BAY Times " " SAY V= 1 22 4 -5 117 +51 n7.51 95.49, 206.80 206.80 168.06 4 4 4 I 0 . J. W. Little (s) GAFF= 1351 237.60 5 1 INTZESIC ION 4 6 b . W. 7+yles (S) . & ism Taylor (N) A. 8sslsy (R) GAMMY BAY UML&(i 1 1 22 1281 1350 8o1 225.29 237.60 240.80 nk J. Tribble 00 SAY Ti$tu;gl S 7 A ZTXR3ZcT10w 239.36 1 tahs Bahron Kamp (9) " " 7 22 1461 256.96 . S I N f & LIRXXT 134' , sphinx mnly (R lie P. wells In Pndrj&Mm is BAY TRACK GAFF! " TEXIJ S 256.96 all 4 1 1 1 'UHLIC WORKS DEPT.. CORPUS CHRISTI. TFxns ENGINEERING DIVISION \v �� ��� y� X77 COMPILED_LI�CHECKED JBC %/23150 .= PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT I ." PAVING ASSESSMENT' FROM Sa1TA Fi TO SOUTH sTAPIM SSW CONTRACTOR T. ROADWAY PAVING RATE PER FRONT :FOOT 1.76 based an Al w140 SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST IO EWALK L N. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL MOUNT / Itlx T. Nwt ti sax � 22 105.60 awl W. psgalar ((� e e 4 F j 12 602 105.60 r,, A. Kaoat S RaiPT08 6 10 501 88.00 bl. singer Ent. (B HLWTOR 6 7-13-9 264.00 150f name V. Pagelar s BAY TERRACE 5 u 1501 264.00 I. H. Sheppard S " " 5 1 1/3 501 88.00 Ikm F. Bemx s ply wiles (s w e ° " 5 5 t 3,13 f 113 501 50' 88.00 88.00 E T E R T R SC t R 6 6 n 12 1501 1502 1. R. cotton s Ke DW.* - s BAY TERRACE M e 264.00 264.00 ire. P. B. Lippert A San= 2 10 50i 138.00 s0 7 L IR i an 41,,707.20 PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS - ENGINEERING DIVISION SOB TOM _ 970+ COMPILED 1'U CHECKED JU ` �/ , 23/50 SIBSWALK YASSESSMENf Muslim STWW FROM ERNIN AVSNUS TO OLIVfR COUNT PAVEMENT CONTRACT -DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT CONTRACTOR FT. ROADWAY ING RATE PER FRONT FOOT 1 #76 Based on 41 Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT g R I N V E I U I I NT E E I C T i O N Lydia ((s) AooeIIawn #2 8 3D4.8 184.45 MW 8 80.0 140.80 Lela Horaww (s) " " 8 50.0 88.00 We* S« M. Revells (s) ° " 8 100.0 176.00 Alga *V Eu9tlws (s) " " 8 10000 176.00 LONC STER D ITE ITER5EC ION Jack H. Scholl (S) Geo. R. Clark Tract 225.0 396.00 Prank & Morris Braslau (8) Matt Dunn Tract 272.5 479s60 0L�lVER C 0 U R T I 14 rE 3 R C T 1 0 N sub-To 932.3 Sub-To 1,640-85 PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION ( COMPILED L.K.T. CHECKED &L-K. S�ARi✓iA� �I�ASSESSMENf Burke Dr., Upriver Road. and (yak P"k A..ms. FROM. mk geh9e1 -te 3!s!e Fjgbp U #9 0ek PAVEMENT CONTRACT CURB COST PER LINEAL FOOT SIDEWALK COST PER S4. FOOT _,U CONTRACTOR 'T. ROADWAY PAVING RATE PER FRONT . -FOOT ajdtu SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER I PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB - LIN. FT. CUR COST TOTAL AMOUNT OA _ PA B CH ©0 F>T PBS I LIMB T. H. Nanda7l (W) Geneva Huj&os 1 1,2 357.85 Jan. •A. Creightan (N) N0oaawn #N �1 75.0 629.81 H. � 1 75.00 132x00 C: A. Est. n w 2 97.6 232,00 V. L. Footer (N) R 171.78 Jae N. Joh>:Ieoa (N) ' a 3 97.6 171.77 Arthur P. Tanhwn (N) Aoadlavn 15 190.6 171.78 171*70 PUR C WORKS DEPT anodic n H I G H W A T N 0. ENGINEERING DIVISION , COMPILED NECKED _ PEABODY STR &T PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT .44 SIDEWALK LUMAIM ASSESSIAENf FROM ANTELOPE STREET TO WEST BROADWAY CONTRACTOR T. ROADWAY PAVING RATE PER FRONT -FOOT 1.76 Based an 4+ Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUM BER LOT UMBER PROPERTY FRONTAICE PAVING COST SIDEWALK L1 N. FT. SIDEWALK COST OURS LIN. FT. CURB COST TOTAL MOUNT A N T S O P S S T R E E T I N T S E C T T 0 6 Catholic Chetah CN) Teresa Terrace 3 3t8 175,0 308.00 B A G N Li S T ET T f TER S EC_T _ ON City of C. 0. (A) Teresa Terrace, Parts 12060 211.20 HUFF LC S TA ST I 4 TER 5 E C T ON Hillcrest Obirch Of Christ Hillcreat 21 23 135-0 237.60 N 0 A K$ S S T R E E T I N T E R S E C T I 0 N Paul McAllister (N) Hillcrest 22 s12 5®.0 88000 H U L B R i TN I ET T 11 TEit 3 NCT 1 ON 06 Be Nickelson (W) Hillorest 23 L, 20 75.0 132000 So C. Gantt ('A ) N 23 4 s 5.6 75.0 132.00 Nat; maKe r (x) " 23 708 50.0 88600 d�ce IMF c�'te l �erLc+�Dtt y tr-To Pr er OWmer 560.0 b-Tb Ci 130.0 Total 11,119600 PUt7LIC WORKS DE I., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION .%� COMPILEd -K.T. CHECKED B.L.H. SIDEWALK ASSESSMENT Peabody 'Street FROM Aut9la "rs Street to West Broadw I► PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT "44 CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT FF.00T Based 1.76 Bad on 41 Bldg SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE DAV I NB COST -- SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT K0 R P$$ STREET I NT 9 1 - s&CT10N _ - - - Arthur Padi13A (W) Hilicrest 24 1-5 125.0 Juan R. & Arthur 220900 Padilla {W) Robert Losaao (W) 26 6,7,8 75.0 132.00 Mary E. Golden (4) " 24 2f1 9,10 11,12 50.0 50„0 88.00 88`00 Al l W T 0 N S T R E E T I - H T E S E C T 1 0 N Bertrae V. MW (W) Hillarest 25 1,2 50"0 88.00 R. H, James (W) 5 88000 Duke batman (W') " 25 5,6 5000 88.00 Riahw4 H. Vatcalf (W) " 25 9,10 50.0 88.00 J. W. Womack (W) " 25 L1,12 50.0 88.00 Y o R$ 5 T R_ $ T I TER E C T ON Helen W. Segrest(W) $illo"rest 26 9010 50,0 88.00 Robert L. Church(W) 26 1,12 50.0 88,00 N U E C E S S T R E E T 1 N T E E C T-1 0 H �ub-TO 650.0 b-Ta 1!aly100 PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS`,. ENGINEERING DIVISION COMPILED L.K.T. CHECKED E.L.K. SIDEWALK U G ASSESSMENT PEABODY STMT FROM ANII&LOPE STREET TO NE8T BROAMAr PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT .44 CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT : -FOOT 1.76 'Based on 4' WidthSIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CUR B COST TOTAL AMOUNT D E Y 1 S E T S T h E E T 3 N T E It s E C 1 1 0 N Sidney E. Herndon (W) HilloraaE 28 1,20 75.0 132.00 W. D. Bright (W) " 28 1,12 5G.0 88.00 J 0 E N S T R E 1 T 1 N 7 E R S E C T I 0 N Horsy 0. Burr (E) Hillarest 29 1,20 75.0 132.00 B. F. Birdwell (W) " 29 4,5,6 75.0 132000 S U I= E R 3 T R E E T 1 I T E R 3 E C T 1 0 N R. L. O'Neal ` (W) Hillorest 30 1,2 50.0 88100 Nrs. C. P. Reacher (W) 30 3,4 5000 88000 H. L. O'Neal (W) " 30 5,6,7 75.o 132.00 Susie L. Dvuglaf & Jac c Lester Hell (N) " 30 8,9 50.0 88100 Z. L. Graham (W) R, " 30 10,11 50.0 88.00 Hefter Brown (W) " 30 1215 100,0 176.03 WEST - -- BR -- ADNAT -- 1 h -- — TER --- E G T 1 - -- 0 N -- Smb—lo�al 650.0 Sub-To 1,14600 PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS _ ENGINEERING DIVISION - COMPILED L,K'T• CHECKED E.L.K9 1A 0C W. Jl J, Jc J, MI FI J, CA P. E, PAVING ASSESSMENT SAM RANKIN FROM CAL U1 STREET TO A. BROADWAi PAVEMENT CONTRACT DATE CLR B COST PER LINEAL FOOT SIDEWALK COST PER See FOOT •44 CONTRAC FT, ROAC PAVING RATE PER FRONT .rF 1,76 based OA 4' width SIDEWALK RATE PER FRONT F PROPERTY OWNER - NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY PAVING FRONTAGE SIDEWALK COST Lim. FT, SIDEWALK COST CURB LI N. FT, CUR COST TOTAL MOUNT C A L W E L L S T R E E T I N T R 5 E C T I 0 R cinder G. Villareal (E) Paul Court 2 6 126.93' 223,1 taviano Oa♦Aan - M " " 11 3.2 501 88.t C 0 M I C H E 5 T 9 E T I N T R S E C T T O N D. Lucas (E) Bluff. 62 5 }11 12 75, 13201 sting Bluntser (E) a 10, N+ 32.1 Trasar (E) 62 37.5E s Caaarae (1*j) " 62 Npart 9 12. 1 5 22.1 L I P A N S T R E E I N E R S 11 C T I 0 N G. Davilla (W) Jones 1 1 130' 228,1 88.1 w. D. isagnirre (VT) " 1 14 501 YES 114A ST R ET I N T E R S E C I0N lis W. Villanueva (W) Jones 10 A* 501 1 88., L E O A R D 5 T R 1 E T I N T E R S E C I O N ha R. Downs (E) Bluff 59 3 1%11,12 15 ' 264.' therine E. Corey Fat.(]) " 59 9 50' 88, & S. Orshanski (E) " 59 8 50, 88• 86. Mandragon (E) " 59 Ni 7 50, 235. o. J. Merriman CW) Wrest End 1 1 134' 84. Vasqus (W) " " 1 t 0 48v I E 1 N T R T I ON PUBLIC WORKS DEPT„ CORPUS CHRISTI, TEXAS SUB TOTAL - 1U00.YJ' ENGINEERING DIVISION U=,Mbrd lot COMPILED _LxT CHECKED] _ 6/ i 3 J B N PAVING ASSESSMENT SAN RANKIN FROM CALDW&L STREBT TO X. BROADWA7 PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT 1� SIDEWALK COST PER Sq. FOOT •44 CONTRACTOR FT. ROADWAY ING RATE PER FRONT i'F00T 1.76 based oL 4 , width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER N NAME OF ADDITION N BLOCK L LOT P PROPERTY D DAVING S SIDEWALK S SIDEWALK C CURB C CLR B T TOTAL . Guinaga (W) M Monterey 2 2 1 1 2 28.33' 4 49.86 2golita M. Ouiterraz(W) " " 2 2 1 100 2 28.33' 4 49.86 m C. GWzales (0) s sluff 5 58 1 11 5 501 8 88.00 ma H. Gonzales (E) " " 5 58 1 10 5 501 8 88.00 ADZ R R 0 S STREET I I T TER 9 9 CTI0N Casares Est. (W) M Monterey 1 1 1 1 2 28.33' 4 49,86 an & I. Gonzales (W) " " 1 1 2 20 5 56.66, 9 99,72 Aan & I. Gonzales (W) B Bluff 5 58 7 7 5 50' 8 88.00 U F F A A, L 0 S S T R E S S T I IN T B S S E C T I I O N A S S E E T S S T R E E T T I N N T E R 5 5 E C T I O O 1 ma L. Lloyd FW) H Hidalgo 2 2 3 3 8 85.18 U U9.76 saa L. Lloyd (W) D Diaz B B 1 1 8 82.8&, 1 145.73 I N N . . B A 1 S S T R E E E T I I N T E R R 3 'E C I I O N mara F. Lopez (W) D Dias A A 1 1 8 82.8, 1 145.73 .`SUC —IVEAL il.OW!Y ENGINEERING DIVISION COMPILEDLK2 CHECKED JRC 6 23�5G PAVING ASSESSMENF 5O RANM asfam FROM R'LDMUL 57h' TO V. BROAW AZ PAVEMENT CONTRACT CURS COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT 5QX CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT :FOOT 7" bas" ea 41 Width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT N UMBER PR PERTV FRONTAGE AVING COST ID EWALK LIN. FT, SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT I SIATION 1 km Orehamski Sw CURMM 1 46.86 82.47 kx OrehansM {w ( tttis Tlwlw '�7 TAWWr y ►amie - TW ^ " 1 I L 0 HO 4 5 ST R 1: �4b.75 ;y 46. T114 NOT 119-1 82.26 82.28 It. Panl�■ llethodiet Chwah (B BT.UP� 5.6 12 50r 88.00 ( rum & Isabel Qo®aales • ) " 54 % ,10, 7,6 1501 1001 261.,00 176.00 Isz Orehan*l I " 53► IC-1 393.07 343.32 Piaake w cum Smith (w ° " 535 535 J 5-'mr 115, `50, 202.40 88,00. Fax Orsbanski w laris C. Rodrigues iw, W Quirow OataecU maxic+aa w e R " MIMI 66.00 88100 5 a 5 13,71. 15,7!6 20,22 50, 56, 50, '• xoare (w F. 5. Nrie3kepoalas w Wak & Morris RrasUu " " w >,: w (8)w w 5 B C 22 23,24 7,8,13 25, 50, 14 156, 41.00 86.00 264.00 =B T1 TAL 1,175.43 SOH 20T $2,068.76 PUBLIC tlVORKS DEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION COMPILED L____a CHECKED pi's 4/W50 G. Fx U F. Mx L. F, Fr S. SIDBWALK PAVING ASSESSMENT SAM RAIiM FROM CALDWELL STREET TO 01. BROADWAY PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT 044 CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT ;FOOT 1.76 based on 4' width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT Nu.mBER PROPERTY ,FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LINO FT. CURB COST TOTAL AMOUNT Pena SE} Colonia Mericana lWj C 5,6 50' 88.00 H. Ortiz (E} a a C 3,4 5oi 88.00 ttie Bases (E) a 1 C 1,2 50' 88.00 A M I 1 $ Z S T R E 1 T I i TE R 3 E C T I 0 N J. Smith (W) �olonia Mextcana U t B 14 25' "00 xaffie Est. (W) a a ME s B 15,18 100' 176.00 larch of God in Christ (W) a B 19,20 50' 88.00 d. W.Sy. Craig (w) a I la B 21 25' 44.00 A. Jones at al a a B 23,24 50' 88.00 J. Saab (E) _ " " W C 1, 12 3001 528.00 oung N�' 28 41.41 72.86 k.0 .p& G.R.R. / G� " C 1 41.4' 2.86 E 3 T B R 3 A D W A Y I I T E R 3 B C T I W ENGINEERING DIVISION SUB TOTAL — 782.8' - COMPILED ULT CHECKED 6�2 simmla" PAVING ASSESSHENf Tn(;AWA STREET FROM EMIXIC$ 3TRM TO LEOPARB PAVEMENT CONTRACT DAT CURB COST PER LINEAL FOOT SIDEWALK COST PER SQ. FOOT 0" 8 P� 8 a �A 1G 1 C 0. C: G A: CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT FOOT 1076 based on V width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE DAV ING COST SIDEWALK LIN. FT, SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT ! Air 0 g 8 T I I T I 4, 2 2 6 147.68* 247.66 a,=& F. BesP (11 Irk Ave. Baptist Ch.(E'i H6IMN ■ 259992 259.88 ! Z R 8 1 0 s. ls"11 (s as. Rooter � Orr (!) SOBT10ID " 101.62 133.30 133.30 1 1 1 .P. 4 3 3 57.74 75.74 75.74 ,a. Annie later (E) X. C. A. (!) a. A. B. flalvidge ($) Bernard Tract Brayton Central Wharf MWhae AR 7 5 7,8,9 BD & E 88.00 58.00 228.80 2 4 50 50 .130 EI! A Z A Y!!U I! 7 ER SE CT 10 C. Hardware Co. (E) ;. Feel (W) a. Cora flood W Ct Nez R. R. Co. (W) Cent. Wharf a Whae. " a " " R " * n e 5 7 7 7 8,9 3 6 7 100 50 50 100 176.00 88.00 88.00 176.00 .ty of C.. C. zl F. 1. Blviehsr (W) set+ Iran Works (E) A"rra►ye Tt0act Pepeta Broadway K X N I B 203.35 255.01 268.03 2 1,22 54 144.89 152.29 SL U H 3 R a T R 2 LZ Ij T ! 89B (Pr. 1L, �s 1 f SUB TOT (Prep. SBE ) 2343,86 PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION COMPILED LST CHECKED JRC SIDUALE 199P ASSESSMENT TANCAHOA STREET FROM HANCOCH STREET TO LEOPARD STREET PAVEMENT CONTRACT CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT .44 CONTRACTOR 7, ROADWAY PAVING RATE PER FRONT fF00T 1976 Based on 41 width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL MOUNT B L U H E R S T E F T E N T E R S E C e I 0 N C 0 V A N CH E S T It E E T I N T I — R S E C — — — — T I 0 N Mary Thompson & E. R. Sleberg (E) Bluff 14 11,12 1000 11asis Hawley Jones (IN) R 16 6 188e00 L I A N B T R 1. E T I — 9 T E R — — S E C T — O N C. C. Independent School District (E) Bluff 13 14 170 299.20 L E O 11 A R D S T F S E T N T E t S E C T 10 N 1'7- 320 1 b-T ©tat 1 563.20 PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION COMPILEk -K.T• CHECKED J.R.C. SIDEWALK A&W ASSESSMENT SOUTH CARA4G "A SIR UT FROM PARK AVEMUL TO BLUCHER STRE&T PAVEMENT CONTRACT DATE CURS COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT -4h CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT iFOOT 1.76 Based on 41 Ridt'§IDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURS COST TOTAL AmOuNT P A RI[ A V 8 A US I I TSB S ECT 1 ON Richard Ling (&) Bernard Tract A 100 176.00 Ling Ranch (E) Schatael Tract 3 io loo 176.00 K A N E T S T 3 E 9 T I N T E S E C T I O N Joe. L. Traverman (E) Pipsa Broed*w 2 12 50 88000 Margaret Desmond (E) " " 2 u 50 88.00 T. C. Brannan (E) " " 2 10 50 88.00 Mae Brandon (E) " " 2 8 50 88.00 H E M E D T S T EAT N T E R s E C I O N C. G. Harthmrs do.(S) Central Nhf.& %M. 1 5 30 52.80 Alamo Iran 1Ncrks (S) w " ■ 1 i 110 191.60 H L U HZ R S T E E T I NT ER S E C rI O N Sub-TD 540 - 950.40 Pu OL IU WVRKS uE rl., GUN FUS CHN I511� 1EXA5 ENGINEERING DIVISION COMPILED L,K6T. CHECKED .Ja-C. BLUCHER STUM PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER SQ. FOOT •44 ING ASSESSMENT' ARTZSIAU STR.ET TO T NCAHUA STMT CONTRACTOR T. ROADWAY PAVING RATE PER FRONT ,FOOT 1.76 based on 41 width IDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOC I( NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. Cute COST TOTAL MOUNT Art4miA a Stree t Intsi section Irpus Christi Independ t School District Bluff 30 12,13 156.19+ 274.89 No. Ca so 5t t In Lion Ith Clark (N) Bluff 15 8,9 136* 239.36 .tp of Corpus Chriati(S Blucher Park 164' 288.64 Tancahtu. Street Intersection TOTAL $802.89 PUBLIC WORKS DEPT.. CORPIIS CHRISTI AS TCY ._.. 456.191 ENGINEERING DIVISION SUB TOTAL - COMPILED LRT CHECKED JRC 6%23/50 ,y 5 k a E b A CALD LL STEM PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT ,44 S77la"= PAVING ASSESSMENT FROM B= LAMA ARE TO N. STAPLES STREET CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT �F00T 1.747 based on 41 width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER N NAME OF ADDITION N BLOCK L LOT P PROPERTY P PAVING S S ID EWALK S SIDEWALK C CURB C CIA B T TOTAL rum & Isabel Gonzales(] G Gregory 7 7213 9 94, 1 165.44 Constants (N " " 1 1 8 +orsto & B. Barrera (N " " 1 10 4 471 8 82,72 ranam Baraj"n (w " " 9 9 5 50.171 8 82.72 Qui.ros (S) m mussett 7 7 1 10 5 501 8 88.00 atael Bmavides (S) " " 7 7 8 8.9 1 1001 1 176.00 . 0. Neal (S) " " 7 7 7 7 5 501 . 88,00 H E L L Z C C O U R I I I T T E R S E E C T I 11 N N • G. Neal (S) m mussett 6 6 1 12 5 501 8 88.00 B R 0 N N N L E E E B 6 6 V D. I I N T R R S E C T T I O N • R. Hawkins (S) m mussett 6 6 9 9 5 501 88,00 Ddge Sanders (S) " " 6 6 8 8 r r 8 88.00 7 F-mp ipo wpasado (S) I If 8 7 S So 8 ins. Cosae (N) S Sutherland 4 4 2 2 5 59.981 1 88.00 Villareal (N) P Paul Court 5 5 4 4*5 8 87.68, 1 154.32 kx Orshanski (S) M Muesett 5 L O 1 E E I L S S T R 9 9 E T I I N T E R R S E C I I 0 N inn Cruz (N) P Paul Court 5 5 1 1,1.2 1 101.561 1 528.00 ME I I I C 0 S S T R 9 9 E T I IN TL t tSECT I ION PUBLIC WORKS DEPT., CORPUS C CHRISTI, TMS SUB 8 ,OTAL - 11 7.39 ENGINEERING DIVISION COMPILED I.AT CHECKED .ror A n,3 /en Ma Ja. in Ja is I. M& S. Ja F. Ha Be Ab An me Cl an To SIMALS PAVING ASSESSMENT CALDWELL STREET FROM BEN LAMA PARK TO NO. STAPLES PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER SR. FOOT_ .44 CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT . -FOOT 1.76 based on 41 width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE DAVING COST SIDEWALK LIN. FT, SIDEWALK C S CURB I FT. CURB COST TOTAL AMOUNT 4 B. Hall (N) Paul Court 4 6 50.78, 89.37 wG6nsalse (N) " " 4 5 50.78 8907 I. Ward (N) " 4 3s4 101.56 178.74 on Campton, Sr. (N) 4 2 50.78' 89.37 89.37 yes Compton, Jr. (N) " 4 1 50.78, T. Cayce Ent. (S) mussett 4 W parrs 33.3' 58.61 E Orshanski (S) 4 $ a t )33.4, 58.78 Galvan S " 4 E part 33.31 5$.61 In & Isabel Gonzal -(3 4 to 5o, 88.00 Colmanero (S) 4 9 5o, 88.00 is Mission Board (S) " 4 8 50, 88.00 O S E P H I I E S T R E B I I N r B R S 9 C T I O Tito Avalos (N) Paul Court 3 6 5x.789 8907 P Block (N) " " 3 5 54.78' 89.38 Tres Alvarez (N) " " 3 4 50.78, 89.37 ry Barthlome (N) 3 3 50.789 89.37 rode T. Carlin* (N) " " 3 2 50.780 89.38 m Garcia (N) " " 3 1 50.781 88.00 .reaa Serna (S) Mussett 3 12 50, ENGINEERING DIVISION V VV v V - — V SUB TOTAL - 909.36, COIAPI LED LXT CHECKED JRC 6i23l50 Z G E A. R. 1A Bi Ns MA F: H. PO V. S. SIDEWALK PAVING ASSESSMENT CALDWELL STRUT FROM BEN GARBA PARK TO NO. STAPLES PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT CONTRACTOR 4µm ^FT, ROADWAY PAVING RATE PER FRONT FOOT 1.76 based oA Ii+ xath SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LINe FT. SIDEWALK COST CURB LINe FT. CURB COST TOTAL MOUNT ``E.� Hendiola �S) kfussett 3 10 201 88.00 U. Rivera (S) 3 9 51' 44.Go Rivera (S) N 3 8 500 88.00 P. South (S) R 3 7 501 8.00 S AM R A N K I N 8 T R E S T I N T 9 R S E C T I 0 9 einda C. Villareal (N) Paul Court 2 6 50.781 caela G. deLamos Sts.( j) R e 2 5 50.781 89.37 G. Murray (N) � R 2 .p 33.52 89.37 ry A. Stephens (N) R >+ 2 44,43 34.52 56.99 noel Sanchez (1[) R N 2 & partrt3 33.52+ 60.76 ancisco & Anita 59.00 R.&G.B.lones (N) a " N N 2 i 50.78 t 89.37 rt lee Co. (a) n n 50.78 89.38 2 12 501 88,00 L A M E D A t T R E T N T E S E C T O N 1 Lozano (N 1 Paul 1.0 & G.R.R. �5� Court mussett 1 11 2 76.161 3,34.04 2 ,$ IQ61 176.00 A S T S T R E E T I N T E R S E C T I 0 N PUBLIC WORKS DFPT_. CORPI@ CHRIS— I ENGINEERING DIVISION V v V _ 1 SUB IDTAL $1 330 28 SUB . aTAL � 755.84 COMPI LEDIKT CHE KED J� �33l wa Pa Jo V. Thl J. SIHTMiALE PAVING ASSESSMENT CALDWELL STREET FROM BEN GARZA PARK TO NO_ STAPLBS PAVEMENT CONTRACTOR CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT 044 FT. ROADWAY. PAVING RATE PER FRONT ;FOOT 1.76 based on 4 l width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CUR B COST TOTAL MOUNT LA S 1 S T R 81ST IN r &R 3 I C T 1 . "Singer Est. (S) "*&Ott 1 14 50' 88,00 ula Garcia Rios (S) " 1 12,13 1001 176.00 hnson Lumber Co. (S) " 1 11 29.87' 52.57 Lozano (N) Paul Court 1 19 2 76.16v 134.04 t Schumacher Co. (N) " " 1 E 1 2 76.16, 134.04 E. Smothers (N) " n 1 •1 142.2T 250.27 .ST L PL E s INTFRS9CTI D N F'ULAIC WUKKS ULF'I., CORPUS CHRISTI, TEXAS SUB TOTAL - 474.391 ENGINEERING DIVISION d 5 4 - Y Z CWAPI LED_LX7__CHECKE0a6 6/23/59 4T U M J11f[1pJ1(aZASSESSMENF PAVEMENT CONTRACT DATE CURS COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT CONTRACTOR T. ROADWAY PAVING RATE PER FRONT ' -FOOT T.76 111,...9 a, bf Ifidtb SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT i. G. dm la Roma(S) Jones 4 8 5b 88.00 F. Quires (3) " 4 9,10 100. 176.00 Mrs. C. F. K. Blueher() " 4 ,12,1 150 264000 0. Bra (N) 7 6 5Q 88.00 F. S. Lotenskiold (N) " 7 5 50 88.00 J• V. Roeignem (N) n 7 4 25. 44.00 Clara T. Garza (N) a 4 25 44.00 V. Morales, Jr. (N) " 7 3 50 8.00 H. H. ffolterman (N) " 7 2 50 88.00 F. Quiros (N) " 7 1 50 88.00 B R O W N L E S O U L E 9 A A D I T E AS S C T x C N Nu Orshanskl (N) Jones 8 200 35WO Mm rim & Frank B'aslau (S) " 3 643 300 528000 M S X I C 0 S T R E E T I N T 8$ S E C T x 0 N Maz Orshanski (S) Jones 2 ,9,10 150 26600 3 & P.O.Singleston(S) " 2 11 50 88.00 J. Oonsalms (S) " 2 L2,13 100 176000 Mrs, M. 9oday (N) " 9 6 50 88.00 Charles Go-cia (N) " 9 4 50 88.00 A. T. Garcia (N) " 9 3 50 88000 (CONTINJED ON THE MIT AGE) Sub-TotiLl 1550 1 Sub-To 2728.00 PUBLIC WORKS DEPT., CORPUS CHRISTI -, TEXAS ENGINEERING DIVISION _ COMPILEDL_K_T. CHECKED,1'_R_C_ PAVING ASSESSMENT FROM CULDULM TO 80 RAMM PAVEMENT CONTRACTOR CONTRACT DATE FT. ROADWAY CURB COST PER LINEAL FOOT ..t 6 PAVING RATE PER FRONT :FOOT T SIDEWALK COST PER SQ. FOOT, based 4' Vld" SIDEWALK RATE PER FROM FOOT II. F. R. J>w J0I 0. F. PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER j PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT lbrt8og, Jr. Jons 9 2 501 88.00 10 10 10 10 1 1 I 6 5' 3-4 1-2 8 9 10 501 iv21 �1 loot- 501 501 50 T. Sazlabas tblmr ora ll) F. Leaderbrand 8 D�. Basle B I Garza (8 R. Garza (S Geitarres S R ■ * r 0 • 88.00 88.00 176.00 i76.00 88.00 88.00 88.00 six RAM Ljj LjRjX x 0 B /IL 5001 BRb ID - s880.0o PUBLIC WORKS OEPT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION COMPILED LII' CHECKED Jlg 0 Fr * PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT PAVING ASSESSMENT mmm FROM HORS STAPIm TO Cm= CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT -FOOT 2 -2 bsaed en 40 Meth SIDEWALK RATE PER FRONT FOOT I.upm G. Ursa S s B 32 8 19H 264.00 G. �; S R B ►� sink & )brads Braslau(H ■ 33 1 1501 264.oa ART SIAR STREET RTER&,',ETI A s. B. S. dould 9 25 12 1502 264.E D3alm & Allison A 0 25 1 1500 264.00 R O R Sus TAL +pop, sus .00 PUBLIC WORKS DEPT., CORPUS CHRISTI, TEARS ENGINEERING DIVISION .COMPILED LKT CHECKED 'RG BLOCK L LOT P PROPERTY P PAVING S S IDEWALK S SIDEWALK C CURB C CUR T TOTAL PROPERTY OWNER N NAME OF ADDITION N NUMBER N NUMBER F FRONTAGE C COST L L N. FT. C COST L LIN. FT. C COST A AMOUNT � • . I I N T 0 0 I2 1 1501 2 Somas & Sots R Rte 4 4 I 264.0( PUBLIC WORKS DEPT., CORPUS CHRISTI, TEARS ENGINEERING DIVISION .COMPILED LKT CHECKED 'RG 0ma Roe W. C. R ©b D. Sm Him Tril 0.1 sau 8,1 IRDPARD STREET PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT PAVING ASSESSMENT - FROM PALM ISIS TO NORTH STAPLES STSXXT CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT . -FOOT SIDEWALK COST PER Sq. FOOT .44 1.76 based FL 41 width SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE AVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN, FT. CURB COST TOTAL kmouNT rrf Aboroa 9fx TORREST PARK W.101 19 a L. All (H) • a 17 4 & 5 Ewe 601 105.60 X. Sheppard (H) [. O11Keara & Chas. TJRESA TERRACK (H)Toresa Terr. 8 T I 4 & 3 L. 90E H YR. S HT19 8C OH 158.40 105.60 96.80 5 5 w Z 551 P I A I 0 R R H 8 art J. Rlebers zat.M K. Martin Tr. Pao.. Railroad Co .(S) 2. Wilson, Jr. (H) me Sasser (H ) Pao. Railroad ($) bblo .1d■. Co. H) f. Hatsh i) Johmon ) i. Dlee (H) > a TRACT • No. PAC. TRACT FAX PARK No. Pee. Tract PALM PARK ^ R R � e W �. 475.20 432 140.880 0 80.08 158.40 132.00 88.00 88.00 176.00 o& V 'F * 270# E 8015E 106. 781 45.5E 901 75' 502 50 3.001 $ 10 5 5 8 SZCTION 1 1 6 5 4 2 -3 J$ 8 Xg ;TRXX XgSz 0 an TC TAL 1*Y?7.781 SUB TO ENGINEERING DIVISION NIMMUKBERED LOT COMPILED La CHECKED_ JRC /23/SO asraaaWL PAVING ASSESSMENT LEOPARD STREET FROM PALM MI9E In BIRTH STAX&B STREET PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER S@. FOOT 9" CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT 'FOOT 1.76 bread 00 41 VIM SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE AVING COST S10 EWALK LIN. FT. SIDEWALK COST CURB LIN, FT. CURB COST TOTAL 'MOUNT ZttszgTio-1 &a Joan (8) SIGHLA&D PARK D T t 8 T� I T $ 26,9 � 0 2 2 p2 E. ?�4 l 1046 " 9 750 175' D. W. Grant Tr. (R) L. H. Joeq, rue. (D Sapehine Lamdrfy, Mm Jhak Bonner Co. (S) Camp bit Co. (s N. Naltorms (S Bea Jobdeon (B Falipe.T. Penn (H aw"d V. asliagar (H �. H. Dr+dterman (V Pedereio fJtiris g � " - " « (S) Hillside " JO1(SS • ° WEST MM iiWaT Mm * e A 1:. 44.0E 52.Oc 132.00 305.00 ]40.80 100 88100 88.00 88.00 W.00 2 $ 7 7 4 4 4 4 7-8 n � 13 5 4 3 2 e 251 750 5DI 50t 50' 5w 61ara Driscoll Eet(S) JUb eYl abet aoosal JONES (A) WST END 0 176.00 196.00 3 —4 2 ,f► lOD+ NIX 0 an TO AL 910. Sm TO AL 811,584.00 PUBLIC WORKS DEPT., ENGINEERING DIVISION CORPUS CHRISTI, TEXAS COMPILED LET CHECKEDJRC fiea ft PAVING ASSESSMENT LROPARB snm FROM PMX Mnl TO NMTH STlP1.8$ STREW PAVEMENT CONTRACT CURB COST PER LINEAL FOOT SIDEWALK COST PER Sq. FOOT �I ,/` 1.76 bamd an 4E width CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT :FOOT IDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER I PROPERTY FRONTAGE 1AV I NP COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN, FT. CURB COST TOTAL AMOUNT MR I E C 0 8 T JXJ Y 0 2 b 1 W [. X..011Tar0o (8) MT W 28.00 M.tw J. Bata Yat.(s J0SF8 9 12 50 88.00 J0S 'P8 I. I g R 0 10 -8-9 150s .. M. Riahardaon (S JQBSS 264.00 ree V. Johnaom (S ) JDUS 10 11 500 88.00 Vadrlao Quaros (m) WaT END 1 5 501 88.00 SAM RANKIN LJIRZZ C INTZISECTION D I STRXM LlTZR3lGTIU Al A wariaan iaticmal Bank &-Truitt Co. (S) HLMFF 45 7 1002 176.00 fl. S R S SUB AL 450* I= TM#L - *M00 PUBLIC WORKS DEPr., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION - - COMPILED CHECKED Roi Arc Dr, Ju] Jet Lui J. 893 �+1 W. I, H. WINIMBAGO STREW PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER S@. F00T .4(, VING ASSESSMENT FROM SBR M 37R= TO MTM li =ff HRoAriff CONTRACTOR FT. ROADWAY PAVING RATE PER FRONT 'FOOT 1.76 based OA E.f VjCjM SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT loif Mirsbal (R CITIZUS $Ti9 D I I 5x 305 TIC) 2 *011a, Q'Dnma2s v A .p.21 X16 f 80 ,A A. R. $ra»h H • 2' 145{ MY� lag Haty,las & line x50.20 O (8 145 mie Mae sumon (H " 1 22 1451 255,20 255.20 her N. Jon" ( SAHHYSim 262.91 2 4 14 . C. 3 149.37 °a° Wan (g " 3 1-1© 298.75 �.80 . Dennis Diaadea (H ) HATCH 0 R 95W 8ICTI H 9- 0 0 3OOf 167.20 176.00 Tarbon'� (S 0 7 1-4 A. 6.: G.R.R. Co. (H e 6 W.P.5 221{5' 389.84 A. U. G.R.R. CO. (H CRAM H19IGM 6 204 �•� bL 31"or, (H " . 6 601 35.20 105.60 A. 7I (H CRAM HICMETS 13-14 H I 8 I 15 352.00 0 1 5 T X p rnoaic rue cri. �..... SUB 21 ITAL - 1,9248 Sob TUT $3 386.24 PUBLIC WORKS DEPT ENGINEERING DIVISION COMPILED I" CHECKED lath WINISBA00 STRM PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER S@. FOOT .44 SIIIBWALC WWASSESSmEllr FROM KENN= STRUT TO UPPIIaR, NMTH BROADWAY CONTRACTOR T. ROADWAY ING RATE PER FRONT -FOOT 1.76 Based on 41 WidWIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT UMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT C0 111 3 T R z T IN r ERS 9 CT I 0 N Loo7a Stormy (N) Cram Heights 20 7 50 88.00 Allis m. Booker (N) " 20 8 50 88.00 U. B. Wel.oh (B) " " 20 9 50 98.00 (N) " " 20 if 2255 44.00 yyro��h�n� �L..��Km-s Roogs.Mt Pilbaa(N) " " 20 10, 11 550 88.00 W. N. Roden (N) 11 " 20 71 25 4600 Albert Priow (N) " " 20 12,13 89.36 157027 city or C. C. (s) T. 0. Ayers Patio 70 123.20 Few L. Llboyd (N) Dias A 13 300 58800 Juanita Patterson (N) • A 7 50 � Aid idis (N . A 45 50 88*W Prank Satiches (N) " A 3 50 88000 FLrentino Sheldon (N) " A 2 50 88.00 s l 2 84.a3 Raw L. Lloyd (Sj 250 1at0.00 Spa Garcia (s) " B 8 50 88.00 laria Oalvan (S) R B 50 88.00 &a L. Lhoyd (s) " B 6 50 88.00 1CONTIMID ON 1HE NEXT F1 4B) Sub -T a1 +47! rTr Sub 12565.30 PUBLIC WORKS DEPT., CORPUS CHRISTI, TEXAS ; ENGINEERING DIVISION ", COMPILED L.K.T. - CHECKED J.R.O. SID""" R% ASSESSMENT WINNEBA©O STREET FROM KRNNNDI TO UPPER NORTH BROADVAI _ PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER S4. FOOT *44 1.76 Bawd on h' Width CONTRACTOR FT. ROADWAY SAVING RATE PER FRONT =FOOT IDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT John Pose (S) Dias B 5 5D _ 88.00 two L. Lloyd (S) " B 1,4 200.2 352.35 S A N R A N K I N STREET I N T E R E C T I — — — 0 N — knee es, Transportation o. (N) Bluff 56 1,12 300 528.00 N0. ALA I I D A STREETI N TEa p E C T 1 0 N Antonia Chic& (N) Sluff - - - 30 ]2 B -7� - - — - - - 132.00 Walter meekly (N) a 50 12 30 52.80 S.A.& A.P.R.R. (N) N 0. Bluff - T A P 69 - E S * 5 T k E 7075 T 1 _ T E R - - - E C T I - - - 0 N - - N. E. Kitchen (N) " 66 A 62.7 12$•19 f 110.35 Tom B. Howell (N) " 66 C 50 88.00 Alm awls (N) " 66 D 32 56.32 L. L. Nelson & J. B. Flowers et al (N " 66 H 100.67 177.18 of L. G. WhitleV (S) 37 7 ISD 261.00 First COW. Church (S " 37 6 150 26e.00 I1AC0 s TR BE INTERSECTION AR7EBiA - QTR -E$T -1 iis'C$ION Kstie Soapke (s) - R — — — 79 7 — — —7g — — - - - I. I. C. Kerridge {S) " 22 7 75 132&00 (CONTINUED aN THE NUT PAGE e Uraw benred Lat Snb-T© 1 1"13 Sub-To 2501,19 .1 vCRr CHRISTI, TEXAS ENGINEERING DIVISION COMPILED L,i.T. CHECKED J.R.C. $IDS _ ASSESSMENT WINNEBA00 STREET FROM KENNEDY STRUT TO UPPM NMTH BROADWAY PAVEMENT CONTRACT DATE CURB COST PER LINEAL FOOT SIDEWALK COST PER S4. FOOT . Alk CONTRACT . ROADV PAVING RATE PER FRONT !FO 146 Based on 41 Width SIDEWALK RATE PER FRONT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMB ER PROPERTY FRONTAGE PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN, FT. CURB COST TOTAL AMOUNT Nre. Kati, xoepke (S) sluff 22 N j 6 75 132,00 R—&Uo - Yukasia (N) " 7% B.B, 152.6 268458 C A R R i Z 0 8 T R E T I I N T SR S T C T I O IN Bd &_ 3ison Groamn (N ) Bluff 75 12 61.01 1OU38 I. 0. K'er'ridge (g)— _> f " 21 6 150 — t s a c �;_.l, 2611.00 City of C.C. (N) " Park 110 7040 T A N C A H U A S T R E E T I I N T E R S E C T I 0 N Florence Dam & Grace Vatters (N) Bluff 8 .21111.12 1129.65 CAR & X G A H U A STHB T I if TNR'ECTI N Oarrea D. Phillips (N) Bluff 7 320 563.$0 U P P E R N 0. B R O A D WA 7 I N E R S E C T I O PIIRLIr, WORKS DEPT Sub-1 tal 1 10112.73 sub-To *l 1835.21 ENGINEERING DIVISION COMPILED L.K.Ty- CHECKED J-R•C- PAVEMENT CONTRACT DATE ` ,CURB COST PER LINEAL FOOT IN µI Tom` •� V. BU Ca Pr Q. No SIDEWALK COST PER S@. FOOT PAVING ASSESSMENT TDDA BLVD. FROM 111MUMN SV= TO ST. SICHMO SIR= AJe. oC AHDAn M PMT STRS6'T TO NIM &Wn CONTRACTOR o ROADWAY PAVING RATE PER FRONT -FOOT 1.76 based sm 41 Vidth SIDEWALK RATE PER FRONT FOOT PROPERTY OWNER NAME OF ADDITION BLOCK NUMBER LOT NUMBER PROPERTY FRONTAGE I PAVING COST SIDEWALK LIN. FT. SIDEWALK COST CURB LIN. FT. CURB COST TOTAL AMOUNT 0 C. & V. campuw (Y) ERDOXM 6D 1-3-5 7-9-12, 300E 528.00 1. 1rysr (V) S. Hwlsnd (w) m.oOKf x 0 U 264.00 264.00 61 61 1 -3-5 77 -9-2,1 15QE 1301 O S. abastain (W) C. III Levtstahstt `w) " " 62 SOE 150f 20.80 264.00 $.p.3 7-9_11 2,4 it R. Reid (S) " P R 30 10-12 30011 528.00 e R. Austin (M) osad lmuohm (S) ink $child (8) " " " 501 50E $8.00 88.00 29 29 29 2 4 6-8- 10-12 200E 352,.00 C. Baker (S) 2-" rgan $kyles (S) " 28 S 10-12 200E 100E 352„00 176.00 Sm 1.800E So TO #3E]63.00 PUBLIC WORKS DEFT., CORPUS CHRISTI, TEXAS ENGINEERING DIVISION COMPILED Ldi CHECKED JjX i/2)/