Loading...
HomeMy WebLinkAbout02915 ORD - 10/25/195010/25%501(5) AN ORDINANCE APPROPRIATING $24,445.34 FROM NO. 298 CITY OF CORPUS CHRISTI WATER YM CONSTRUCTION FUND TO COVER THE COST OF WATER PROJECTS NOS. 211 AND 212, CONSISTING OF THE INSTALLATION OF PUMPS FOR RAW AND SETTLED WATER AT THE CALALLON FILTRATION PLANT; AUTHORIZING AND DIRECTING THE DIRECTOR OF PUBLIC WORKS TO PROCEED WITH SUCH Ii[- PROVEMENTS IN ACCORDANCE WITH SUCH IMPROVEMENTS IN AC- CORDANCE WITH THE ESTIMATE AND SKETCH ATTACHED HERETO AND MADE A PART MUM, WITH SAID WORK TO BE DONE BY CITY FORCES; AND DECLARING AN EMERGENCY. WAEREASs There is needed $24,445.34 to cover the cost of the installation of pumps for raw and settled water at the Calallen Filtration Plant; and materials incorporated therein; and WHEREAS, The approval of said project has been secured from Greeley andHanson, Consulting Engineers representing the holders of the Water Bonds; and WHEREAS, There are sufficient fund available and unappro- priated in No. 298 City of Corpus Christi Waterworks Construction Fund to cover the cost of said project; and WHEREAS, It is contemplated that said work will be done by City Forces; NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY CF CORPUS CHRISTI, TEAS: SECTION I. There is hereby appropriated the sum of $24,445.34 from Fund No. 298 City of Corpus Christi Waterworks Construction Fund, out of which amount there is to be paid the estimated cost of Water Project No. 211 in the amount of $13,043.38 and of Water Project No. 212 in the amount of $11,401.96, said projects con- sisting of the installation of pumps for raw and settled water at the Calallen Filtration Plant and all materials incorporated there- in, in accordance with the attached estimates of cost of said pro- ject, which said estimates are attached hereto and made a part hereof; the approval of Greeley and Hansen, Consulting Engineers for the bond holders having been obtained on May 29, 1950- SECTION II. The Director of Public Works of the City of Corpus Christi is hereby directed to proceed with the work describ- ed herein with City Forces. -l.. zq/.� I' SECTION III. The fact that it is necessary to increase the rated capacity at the Calallen Filtration Plant in order to alleviate existing inadequacy of Water Supply for the City of Corpus Christi, and to so increase said Water Supply and source of revenue, creates a public emergency and an imperative public necessity requiring the suspension of the Charter rule that no ordinance or resolution shall be passed finally on the date it is introduced and that such ordi- nance or resolution shall be read at three several meetings of the City Council, and the Mayor, having declared such emergency and neces- sity to exist, requesting the suspension of said Charter rule and that this ordinance be passed finally on the day it is introduced and take effect and be in full force and effect from and after its passage, IT IS ACCORDINGLY SO ORDAINED. PASSED AND APPROVED, This th%& ' day of y , 1950. MAYOR The City of Corpus Christi, Texas T• 3ty Secretary APP OVED AS TO LEGAL FORK: i me a Corpus Christi, Texas n"n, , i.s , 1950 TO THE LUMERS OF TIM, CITY COUNCIL Corpus Christi, Texas Gentlemens For the reasons set forth in the emergency clause of the fore- going ordinance, a .public emergency and imperative necessity exist for the suspension of the Charter rule or requirement that no ordinance or resolution shall be passed finally on the date it is introduced, and that such ordinance or resolutions shall be read at three meetings of the City Council; I, therefore, hereby request that you suspend said Charter rule or requirement and pass this ordinance finally on the date it is introduced, or at the present meeting of the City Council. Respectfully, City of Corpus Christi; Texas The Charter rule was suspended by the following vote: Leslie Wasserman _QW Jack DeForrest Barney Cott Sydney B. Herndon' George L. Lowman The above ordinance was passed by the following vote: Leslie rasserrvan Jack DeForrest Barney Cott Sydney E. Herndon George L. Lowman v — aqJ 5 FINAL j�'JMMATE ACTUAL COST " MATERIAL AND LABOR USED ON JOB 211 QUANTITY SIZE DESCRIPTION UNIT COST AMOUNT LABOR AMOUNT 1 16 "x2 11 B&S Reducer Small Erd 163.67 " " Y BranCh, 2 belle C 1 2 241t Flange & Spigot Pi e C_.B 206.24 1 24" Flan e & Spigot Pie 72 "lo 147.70 1 2411 Flanged Ck. Valve 15C Lbs. 1,190.00 2 2411 Solid Sleeves, , blechanical 1.42.40 _ 2 3611 Solid Sleeve 15- (31.0 249.86 _ 11 curves,450 — 81 361, Cl. 100 B&S Pipe 2 106.2 1 14,-M GPM Settled Water Ptun 906.00 _ 121 Ids Ready Mix Concrete _ 93 1-;�[ Sz Machine Bolts 12001 21 Ft. Deformed Rd. Reinf. S el 58.15 57609 Lumber 252.34 MISCELLANEOUS COST UNIT COST I AMOUNT 100# No. 9 Annealed Tie Wire 9912 Dragling work 165.00 Nail,q 7.m Lead 2 2 Total Cast at ob 113043.38 Materials Reclaimed on job Materials Abandoned on job Date Work Commenced Date Work Completed 10'1"50 ESTIMATE OF COST PROJECT NO. 21: LOCATION Settled Water (Installation of New Pump) QUANTITY SIZE DESCRIPTION MATERIAL INSTALLATION MATERIAL & INSTALLATION UNIT COST TOTAL COST UNIT COST TOTAL COST l 14.000) GPM SettlirLa PUMP Vertical at 2Q ft. total a ' 6" 2 " B&S red. sal ] and bell, Class B 1 3611x2lill Y 2 -w siot- 01assB 1 W1 Flange & Spigot pipe 4811 C Iss B „ o 2 ". SQlid S 2 3611 Solid Sleeves 1511 long., C 2 361, 8 Gurves h5o., —111' " B & S C + Lengths Fittings 1 20 Flan Check Valve 15Q LUs, TOTAL COST MATERIAL TOTAL INSTALLATION COST TOTAL COST MATERIAL & INSTALLATION 13.12.31 JUSTIFICATION FIIUL ESTIVATE ACTUAL COST MATERIAL AND LABOR USED ON JOB 212 QUANTITY SIZE DESCRIPTION COST AMOUNT - LABOR AMOUNT 1, 24l1 d Check Valve 1 1 1 0.00 1 2" d &S i otPi it 20 _ 0" oFlan R 0 "x -all Bell -C1.B 2 l n E -r 36"x3i'!x2411 Side Outlet, rp.(i.T 359.48 1 6 "x ° E B 1441 3011 Class 100 B&S CIP -1,565.28 81 b" Class loo B&S cip _ 1 14.00 GPM Raw -Water Pum_ 6,56h.00 12 Cartons Vee Cups 6 Long Handle Shovels 12.h2 1 3# Caulking Hammer 3.98 288 Oakum MISCELLANEOUS COST UNIT COST AMOUNT 450 Lead Caulking Tnol 19,01 Caulking 2 1=x i Machine Bolts-hex.nut 69.62 10 Sacks CemQnt Total Cost of job Materials Reclaimed on Job Materials Abandoned on Job Dale Work Commencer) Date Work Completed 10 -1-50 , ESTIMATE OF COST PROJECT NO. 212 T.nc ATTnN ❑.— w, +, rT_.. +..,, -- __ _ QUANTITY SIZE DESCRIPTION MATERIAL INSTALLATION MATERIAL d INSTALLATION UNIT COST TOTAL COST UNIT COST TOTAL COST 1 1 OOO G.P.M. Vertical Raw Water 6,504-00 1 2" Flan e& Spigot Pipe 2" Long B Class " ° Elbow all bell B Class 1 6 "x 61# Reducing Elbow, small end bell B Class 1, 611x3611 " — Side outlet red. Tee 2 Bells, n t Class B 6 "x 0° Blbnmr B & S p ' 3011 Calss 100 B Rc S I pipe— 16' Len the ' 3611 glass 100 V &SC.I —16' Lentbs C . . . . 1 2" Flanged Check Valve 150 lo. 1,190.00 Horizontal Swing TOTAL COST MATERIAL 111,635-46 1 1 000.00 - - - - - - - - - - - - - - - TOTAL INSTALLATION COST TOTAL COST MATERIAL 6 INSTALLATION 12,635.1-A JUSTIFICATION October 25, 1950 , 1949 I certify to the City Council that the money required for the contract, agreement, obligation, or expenditure contemplated in the above and foregoing Ordinance is in the Treasury of the City of Corpus Christi to the credit of SM No, 298 City of Corpus Christi Waterworks Construction Fund from which it is proposed to be drawn, and such money is not appropriated for any other purpose,