Loading...
HomeMy WebLinkAbout02924 ORD - 11/07/1950Ginger :gp AN ORDINANCE AROPRIATINli�86,408.84 FROM NO. 298 CITY OF S CONSTRUCTICN FUND FOR WATER IMPS 5 wKs. TEO, DODDRIDGE STREET, FROM ALA D TO SANTA FE; S ;T�i, ,OSEw00D do BLASE STREETS; , HEINIEY STREET, FROM NIAGARA TO EIGHTEENTH, 23 , 2 MON STREET, FIM RUTH TO AGN35 KOSTORYZ ROAD, FROM GOLLIHAR ROAD TO IMINGTCN BLVD.; AHD 239, 111.rum ROAD, FROM ALAMEDA TO MCARD E ROAD, BEING NECESSARY E %TENSIONS OF THE WATER DISTRIBUTION SYSTEM OF THE CITY OF CORPUS CHRISTI IN ACCORDANCE WITH ESTIMATES ATTACHED HERETO AND MALE: A PART HEREOF; AUTHOR- IZING AND DIRECTING THE DIRECTOR OF PUBLIC WORKS TO PROCEED WITH SUCH PROJECTS, To BE INST BY CITY FORCES; AD DECLARING AN EMERGENCY. WHEREAS, There is needed approximately $86,408.84 for cost of the installation of necessary extensions of the Water Distribution System, as described herein, and all materials incorporated therein; and, WHEREAS, The approval of said projects has been secured from Greeley and Hansen, Consulting Engineers for the bonding company; and WHEREAS, There are sufficient funds available for such projects in Fund No. 298 City of Corpus Christi Waterworks Construction Fund, and WREREAS, It is contemplated that said work will be done by City Forcesr NOW, THEREFORE, BE IT ORDAINED BY THE CITY COUNCIL Cr THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. There is hereby appropriated the sum of Eighty-Six Thousand Four Hundred Eight and 84/100 Dollars ($86,408.84) from No. 298 City Fo Corpus Christi Waterworks Construction Fund for Water Imprw e- ment Projects Nos. 210, Doddridge Street from Alameda to Santa Fe; 230, Prescott, from 15th St. to 18th St.; 231, Rosewood & Blake Streets; 233, Heinley from Niagara to 18th St.; 234, Harm Street from Ruth to 2 Airline Rd. Agnes 35, Kostoryz Rd., from Gollihar Rd. to Lexington Blvd; 239 /from Alameda to McArdle Road, as more fully described in the estimates attach - -1- ad hereto and made a part hereof. SECTION 2. The Director of Public Works of the City of Corpus Christi is hereby directed to proceed with the work described in Section I hereof to be done by City Forces, SECTION 3. The fact that it is necessary tomake such appropriation as above set out in order that these needed water pro- jects for extensions of the water distribution system of the City of Corpus Christi may be commenced to provide more adequate facilities to protect the health and general welfare of thepeople of the City of Corpus Christi creates a public emergency and an imperative public necessity requiring the suspension of the Charter rule that no ordi- nance or resolution shall be passed finally on the day it is introduc- ed and that such ordinance or resolution shall be read at three sev- eral meetings of the City Council, and the Mayor, having declared such emergency and necessity to exist, requesting the suspension of said Charter rule and that this ordinance be passed finally on the date it is introduced and it take effect and be in full force and effect from and after its passage, IT IS ACCORDINGLY SO ORDAIM, PASSED AND APPROVED, This thejNay of November, 1950. MAYOR - - AT? T= The City of Corpus Christi i y acre arq APPROVED AS TO LEGAL FORM: Y Attorney ESTIMATE OF COST PROJECT NO. 210 LOCATION Doddrldge (Alameda - Santa Fe.) QUANTITY SIZE DESCRIPTION MATERIAL INSTALLATION MATERIAL & INSTALLATION UNIT COST TOTAL COST UNIT COST TOTAL COST 1500 _x"10" C.I.M.7. Pipe 2.20 3,300.00 .70 1,050.00 4,350.00 48 16" C.I.M.7. Pipe 5.21 250.08 1.25 60.00 310.08 16 12" C.I.M.7. Pipe 3.57 57.12 .70 11.20 68.32 48 6" C.I.M.7. Pipe 72,4B .50 24.00 96.48 16xl2 Too 100.00 100.00 15.00 15.00 115.00 1 16m10 B.edytser 45.00 45.00 8.00 8.00 53.00 2 10x6 Tees 24.00 48.00 8.00 16.00 64.00 1 10x6 Cross 29.00 29.00 10.00 10.00 39.00 1 12" H.E. Cate Valve 137.50 137.50 12.00 12.00 149.50 0" H.E. Gate Valve 97.24 194.48 10.00 20.00 214.48 4 6" H.E. Gate Valves 44.90 179.60 5.00 20.00 199.60 Fire Hydrants 100.70 201.40 15.00 30.00 231.40 Valve Boxes & Lids 4.90 34.30 2.50 17.50 51.80 14 Long Extensions 1.28 17.92 1.00 14.00 31.92 TOTAL COST MATERIAL 4,666.88 _ _ _ 1 307.70 TOTAL INSTALLATION COST TOTAL COST MATERIAL & INSTALLATION 5.974.58 JUSTIFICATION This line is necessary as a Cross -tie between Alameda & Santa Fe in order to deliver Water to the 6" on Santa Fe. Materials must be proeured for this job. ACTUAL COST MATERIAL AND LABOR USED ON JOB QUANTITY I SIZE I D E S C R I P T I O N I COST I AMOUNT II LABOR I AMOUNT 11 MISCELLANEOUS COST I UNIT COST I AMOUNT Materials Abandoned on Job Date Work Commenced Date Work Completed- PROJECT 210 PROPOSEb LINES EXIST /N6 LINES SCALE 1 „_ 400' 90,r/ .42.4 MEOH cf n I To.=f/!A S7 - a ' aysriA' sr IAWNI' /EG.� sr 7 ti V � � I MoyrE.QNEY Q S7 y aI oI 6„ SANTA `, FE ST. I L IFIMM I ACTUAL COST MATERIAL AND LABOR USED ON JOB QUANTITY SIZE DESCRIPTION CAST AMOUNT L A R O R AMOUNT i 8 3/4 IWW, 1 *49 3.916 9 -21450 U440 _ E 2ze 11PA" 4030 '56 9 -22-5O 24651 #-woo 96.00 9-25 -M 19.00 MISCELLANEOUS COST UNIT COST I AMOUNT rift Lald 1*130 0.00 Dims Haul 6.00 16.00 860096 W. Total Coat of ob 3 Materials Reclaimed on Job Materials Abandoned on job Date Work Commenceda-l6 -w Data Work Completed 9-80 -® ESTIMATE OF COST PROJECT NO. LOCATION JUSTIFICATION 1poa*ly Hoport of. Projoot upwAilsras to be r "I UHLTb' FWa - MATERIAL AND -LABOR USED ON JOB QUANTITY asw tta UNIT COST lBa AMOUNT p Jost 230 preamb (15th LABOR . loth AMOUNT 975 i" id.J.a.I. Pipe 1.51 1$478488 6+26-50 88 - 4" tt11.41I. Pipe 2.00 68400 6 -17 -50 15026 -- 1 826 TappW Rloore 46.65 40.65 9 -9-80 88.00 2 6" Tapping MY@ 58.60 62.80 921 -80 86.65 8 6X6 TN 29x40 So." 9- 13+50 _ 58.o0 !p i" BOB* Oato valve "Jo 86.80 9 -14-50 1 .94 1 Fite Bono 91.96 97.78 9 -15-80 D7.88 1 6X4 areas 84.66 09 9 -11 -00 13.61 4 4" B.Z.-Oats Ya1n 30600 290000 9 -16 -50 149.16 8 & :4 Ysob# Rodu*rs 11.90 83.60 9-19-M 125.81 1 426 itch. areas 18606 18.06 9 -80-50 _ 10.56 1 6" 1/38 N.W. Boll as 1& 13.08 _ 1 6" 1/16 W.R. Bala„ ell 10.84 10.84 _ 1 6" W. J. sidwo 8.95 8.93 1 6" Drill k Topped Plug 5.56 5.5B MISCELLANEOUS COST UNIT COST AMOUNT 1 2" 908 Bend .69 169 66 2" aa17. Iran Pipe .31 84.48 8 2=10 Nipples .53 4.84 8 2" style 40 B. Dresser 4.48 6.84 8 8" 45o Bea& 694 5098 3 8" Style 36 Eraser 8.14 6.48 8 Yalta Bozos & Lids 4.90 89.40 3 LNg 8staaaleas 1.98 3.84 8 Short xxtaasioas .011 1.78 as Y &s. aaliah• 1.80 99.00 180 Lis. Load .18 Wow 8I Too 1 .95 106 Total Cost of job Materials Reclaimed on Job Materials Abandoned on Job Date Work Commenced' -14 - -BD Date Work Complete9 -95 50-50 ESTIMATE OF COST PROJECT NO.= LOCATIONS *011 (Ii►t - 28th) JUSTIFICATION ofk" Jim ass vmrjgmt]y amade, to oalwo sko very low pmu mea mblah war 0*64" jW a Tar da a ". to mrtiimto or Preis" ,mss proIored at the U— slit" it was AssssmMy %a p"good dlb s"atywUm irmsclotso. Regowb l— now mods for r"AbWasisrt from awd raw". PROJECT 230 0 PROPOSED LINES - -- EXISTING LINES SCALE 1 "s 400' ESTIMATE OF COST PROJECT NO. 231 LOCATION Rosewood & Blake St. QUANTITY I SIZE DESCRIPTION MATERIAL INSTALLATION MATERIAL & INSTALLATION UNIT COST TOTAL COST UNIT COST TOTAL COST 3000 8" C.I.M.T. Pipe 2.09 6,270.00 .60 1,800.00 8,070.00 1400 6" G.I.M.T. Pipe 1.51 2,114.00 .50 700.00 2,814.00 1 24 x 8 Tapping Sleeve & Valve 196.00 196.00 125.00 125.00 321.00 1 24 x 6 Tapping Sleeve & Valve 155.51 155.51 125.00 125.00 280.51 4 B" H.E. Gate Valves 50.75 203.00 6.00 24.00 227.00 9 6" H.T. Gate Valves 44.90 404.10 5.00 45.00 449.10 6 Fire Hydrants 100.70 604.20 15.00 90.00 694.20 4 8 x 6 Tees Mach.) 28.14 112.56 5.00 20.00 132.56 4 8 x 6 Tees Mach. 19.49 77.96 5.00 20.00 97.96 1 8 x 6 Croce (Mach.) 30.53 30.53 6.00 6.00 36.53 15 Valve Boxes & Lids 4.90 73.50 2.50 37.50 111:00 30 Long Extensions 1.28 38.40 1.00 30.00 68.40 TOTAL COST MATERIAL 10,279.76 3,022.50 TOTAL INSTALLATION COST TOTAL COST MATERIAL & INSTALLATION 13,302.26 JUSTIFICATION This line urgently needed to deliver an adequate domestic supply to a large area and to provide fire protection. ACTUAL COST MATERIAL AND LABOR USED ON JOB QUANTITY SIZE DESCRIPTION UNIT COST AMOUNT LABOR AMOUNT 11 MISCELLANEOUS COST I UNIT COST I AMOUNT Materials Abandoned on Job Date Work Commenced Date Work Completed PROJECT 231 PROPOSED LINES - -- - (EXISTING LINES SCALE I "= 400 � I 9s - -_— ROS OD oST. P ' I • So (�` QI I e RantWy Report of Projeot Expenditures to be Reimbursed from Bond Fund ACTUAL COST MATERIAL AND LABOR USED ON JOB s temper aw Water Distrib N N - 18th L A H O R AMOUNT =--y QUANTITY .11, DES C R I P T I O N UNIT COST AMOUNT 1048 6" Yr7.0,I. Pipe 1.51 105'x146 8- 31+x50 19.32 38 4" i4. J.O.I. pipe 1.00 39000 9 -540 36.63 �- 1' 6x8 Tom 19.49 19.49 9 -6-50 39460 4 6" H.B. gets Valve 44.90 1'19.60 9 -7 -30 110,64 1 ylio Hydrami 94.96 94.96 9-9+50 _ 75.96 1 6x6 N.V. Tao 19.49 19.49 9 -9-50 71628 1 6" 1/16 Meek. Bead 10.94 10.24 9 -11 -50 _ 99.11 2 4" B.B. Oaie Ps1Po 30.00 60000 9 -12 -50 _ 991% 2 4" 450 Bead 9.46 18.92 9 -13-OD _ 36.43 1 4" Drilled Tapped Kee 6.50 6.50 10 2" Oopper .73 7.30 40 3/4 copper .25 10.00 - 100 Lbs. Load .12 12.00 1 2" Style 88 std. Dreamer 2.14 2.14 7. 7 1 2x6 Nipple .49 .49 MISCELLANEOUS COST UNIT COST AMOUNT 1 2x10 Nipple .63 .83 60 2" 041P. Ina Pip* .37 22.20 2 2" 15425 3.80 7460 6 Pale Boxes L Lido 4.90 29.40 6 Leas Massless 1.28 7,68 2 Sheri Szi92810*0 089 1.96 50 Tda. Callshe 1.80 93.60 1 2x6 D.S. Saddle 5.96 546 1 2" Brass gets Volvo 9644 9.44 2 2" Brusm Nipploa .Vg 1196 1 2" 40 Ube .94 1 474 2 2" Drosser iiylo 62 9,09 14.16 Tatai Cast at rob Materials Reclaimed on job Materials Abandoned on rob Date Work Commenced 8-31-50 Date Work Completed9 -13-50 ESTIMATE OF COST PROJECT NO. 233 LOCATIONHslmiey 4 Prssestt (Niagara - 18th) IUSTIFICATION Thin llae rag mrgalatly mssded t® relleve the very low pressure imbleb was oamoed by a very dry scooter. No astiaate or projut was prepared at the time sis<a it wu assessary to pwossad rich somstrwtioa lmmadlste4. Hegasst is now made for relabwrsammiA from fomd rmdg. ACTUAL COST MATERIAL AND ,LABOR USED ON JOB Tr-,4 AT- 971 (1,T4 �nw _ lR +.h1 QUANTITY SIZE DESCRIPTION COST AMOUNT LABOR AMOUNT 3 3/4 15U00 489 5.67 3 3/4 14275 2.62 7.86 -- 2 2" Dreaaar style 62 4041 9602 2 2" 144$4 300 7160 MISCELLANEOUS COST UNIT COST AMOUNT Dltalw Ravi 800 2 283♦61 Total Cost of Job erg Materials Reclaimed on Job Materials Abandoned on Job Date Work Commenced 8-U-50 Date Work Completed PtIP'50 ESTIMATE OF COST PROTECT NO. LOCATION JUSTIFICATION PROJECT 233 PROPOSED LINES - - - EXISTING LINES SCALE I "- 400' ILI LJ ►-1 � L N f/ H 4• �v nyf. t< nf1N�` ESTIMATE OF COST PROJECT NO. 234 LOCATION Harmon (Ruth - Agnes St.) QUANTITY SIZE DESCRIPTION MATERIAL INSTALLATION MATERIAL & INSTALLATION UNIT COST TOTAL COST UNIT COST TOTAL COST 1500 6" C.I.M.7. Pipe 1.51 2265.00 .50 750.00 3,015.00 125 4" C.I.M.T. Pipe .97 121.25 .40 50.00 171.25 9 6" H.E. Gate Valves 44.90 404.10 6.00 54.00 458.10 7 4" H.R. Cate valves 30.05 210.35 5.00 35.00 245.35 7 6 a 6 Tees (WVI) 19.49 136.43 6.00 42.00 178.43 3 6 x 4 Tees (Meeh.) 21.25 63.75 6.00 18.00 81.75 2 6 x 4 Crosses (Meth.) 24.91 49.82 8.00 16.00 65.82 5 Fire Hydrants 4' 100.70 503.50 15.00 75.00 578.50 16 Valve Boxes & Lids 4.90 78.40 2.50 40.00 118.0 TOTAL COST MATERIAL 3,832.60 11080.00 - TOTAL INSTALLATION COST TOTAL COST MATERIAL & INSTALLATION _ 4.912.60 JUSTIFICATION This line will serve as a header for, the 2" lines and to provide fire protection. Mate�ia /s % be �v�oc urPd �o/' ehis x'06 ACTUAL COST MATERIAL AND LABOR USED ON JOB QUANTITY I SIZE DESCRIPTION I SST I AMOUNT II LABOR I AMOUNT -- I 1 1 1 11 MISCELLANEOUS COST I UNIT COST I AMOUNT Date Work Commenced Date Work PROJECT 234 PROPOSED LINES - - -- EXISTING LINES SCALE I 400' " -1 F--7F--1 nil ESTIMATE OF COST r PROJECT NO. 235 LOCATION Eostoryz Ed. (Gollihar - Lexington ) QUANTITY SIZE DESCRIPTION MATERIAL INSTALLATION MATERIAL& INSTALLATION UNIT COST TOTAL COST UNIT COST TOTAL COST 3700 12" C.I.M.T. Pipe 3.57 13 209.00 .90 3,330,00 16 5 9 300' 6" C.I,M.J. Pipe- 1.51 453.00 .50 150.00 603.00 3 12" H.E. Gate Valves 137.50 412.50 10.00 30.00 442.50 1 8" H.E. Gate Valves 50.75 50.75 6.00 6.00 7 2 6" H.S. Gate Vol ves 44.90 89.80 5.00 10.00 99 1 12 x 8 Tee (WW) 27.59 27.59 8.00 8.00 35.59 2 12 x 6 Team (WW) 32.60 65.20 8.00 16.00 81.20 1 Fire Hydrant 4' 100.70 100.70 15.00 15 7 6 Valve Boxes & Lids 4.90 29.40 2.50 15.00 44.40 12 Long Extensions 1.28 15.36 1.00 12.00 27.36 TOTAL COST MATERIAL 14 453.30 _ _ - - - - - - - _ _ _ 3,592.00 TOTAL INSTALLATION COST TOTAL COST MATERIAL & INSTALLATION 18,045.30 JUSTIFICATION This Line will supply the new telephone building, Southside Addition, Lexington Estates, And remove some of the load from the Cab4ni.ss Field line. /vlc?Zeria /P t-v 6 e /o.ce.v.-ea/ foA- Zhis fah, ACTUAL COST MATERIAL AND LABOR USED ON JOB QUANTITY I SIZE DESCRIPTION I COST AMOUNT (I LABOR I AMOUNT I I I 1 II MISCELLANEOUS COST I UNIT COST I AMOUNT Total Cost Date Work Commenced Date Work Completed PROJECT A35 PROPOSED LINES - - -- EXISTING LINES SCALE 1 %400' b rc Fr Q m UEEN m DR. o WOOOLAN,0 � z Rroiv RO o ? R0aFRSQA1 OR. k SOUlHWOOO _ ---- :�os�d -i-- -- - - - - -- ------ - - - - -- Aosroarz Ro. � h � W 0A J /A yt O ESTIMATE OF COST PROJECT NO.239 LOCATION Airline Rd. (Alameda - YeArdle) QUANTITY SIZE DESCRIPTION MATERIAL INSTALLATION MATERIAL & INSTALLATION UNIT COST TOTAL COST UNIT COST TOTAL COST 5700 16" I.M.I. . Pipe 5.21 29,697.00 1.10 6,270.00 35,967.00 2 16" H.E. Gate halve_ 328.50 657.00 15.00 30.00 687.00 1 16x16 rapping Sleeve & Valve 600.00 600.00 150.00 150.00 750.00 1 16" /8th Bend 50.00 50.00 6.00 6.00 56.00 3 16x6 Team 88.00 264.00 10.00 30.00 294.00 3 6" H.S. Gate Valve 44.90 134.70 5.00, 15.00 149.70 2 Fire Hyd *ant 100.70 201.40 15.00 30.00 231.40 5 Valve Boxes & Lids 4.90 24.50 2.50 12.50 37.00 8 Long Extensions 1.28 10.24 1.00 8.00 18.24 TOTAL COST MATERIAL 31,638.84 TOTAL INSTALLATION COST TOTAL COST MATERIAL & INSTALLATION 38,190.34 JUSTIFICATION This route will transfer water to the Naval Air Station and the Flour Bltrff Area. ACTUAL COST MATERIAL AND I;ABOR USED ON JOB QUANTITY SIZE D E S C R I P T I O N COST I AMOUNT I L A B O R AMOUNT c J1 MISCELLANEOUS COST I UNIT COST I AMOUNT onion Date Work Commenced Date Work Completer] PROJECT 239 PROPOSED LINES - -- EXISTING LINES SCALE 1 "s 800' 9• l 0� ti pt 4' P p OJN\ 4t q /RL /NF RD vROP05'EIi �E ti � $86,408.84 November. 3. 1950___ I certify to the City Council that the money required for the contract, agreement, obligation, or expenditure contemplated in the above and foregoing Ordinance is in the Treasury of the City of Corpus Christi to the credit of No. 298 City of Corpus Christi Waterworks Construction Fund Fund from which it is proposed to be drawn, and such money is not appropriated for any other purpose. Director of Finance Corpus Christi, Texas November 7 , 1950 TO THE L'EIt MS OF THE CITY COUNCIL Corpus Christi, Texas Gentlemen: For the reasons set forth in the emergency clause of the fore- going ordinance, a public emergency and imperative necessity exist for the suspension of the Charter rule or requirement that no ordinance or resolution shall be passed finally on the date it is introduced, and that such ordinance or resolution shall be read at three meetings of the City Council; I, therefore, hereby request that you suspend said Charter rule or requirement and pass this ordinance finally on the date it is introduced, or at the present meeting of the City Council. Respectfully, (nj j j J'1_4 p City of Corpus Christi, Texas The Charter rule was suspended by the following vote: Leslie Wasserman /� J Jack DeForrest Barney Cott Sydney E. Herndon George L. Lowman The above ordinance was passed by the following vote: Leslie lyasserman �,y,� Jack UeForrest Barney Cott Sydney E. Herndon George L. Lowman