Loading...
HomeMy WebLinkAbout03384 ORD - 01/13/1953AN ORDINANCE RECEIVING AND ACCEPTING THE WORK OF IMPROV- ING AYERS STREET, WITHIN THE LIMITS HEREIN - BELOW DEFINED, IN THE CITY OF CORPUS CHRISTI, TEXAS, PERFORMED BY J. M. DELLINGER, INC.; APPROVING AND ACCEPTING THE MAINTENANCE BOND FURNISHED BY J. M. DELLINGER, INC. IN CONNECTION WITH SAID WOBK; AUTHORIZING AND DIRECTING THE ISSUANCE OF SPECIAL ASSESSMENT CERTIFICATES AND DECLARING AN EMERGENCY BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, SECTION 1. That the work of improving the following street and portions thereof in the City of Corpus Christi, Texas, to -wit: AYERS STREET from the Northeast property line of Baldwin Boulevard to the Southwest property line of Norton Street by raising, grading, filling, widening, paving, repaving or repairing same, by the construction, reconstruction, repairing or re- aligning of concrete curbs where the Director of Public Works determined adequate curbs were not installed on proper grade and line, and by constructing such storm sewers and drains, together with all other necessary incidentals and appurtenances, all as deemed adequate by the Director of Public Works and as provided for in the glans and specifications for such improvements prepared by said Director of Public Works; and by paving, repaving and repairing said street with a four and one -half (4j ") inch hot mix asphalt base course, and the construction thereon of a substantial wearing surface of one and one -half inch (1 * ") hot mix asphalt surface course, and the doing of other work incident thereto, all as provided for in the plans and specifications for such improvements, having been performed and completed in accordance with the terms and provisions of the contract and the plans and apecifi- cations therein contained, dated August 12, 1952, being between the City of Corpus Christi, Texas, and J. M. Dellinger, Inc., and the Director of Public Works of said City having examined, measured and caused to be tested the finished improvements by the means and manner provided by the terms of said contract and the plans and specifications therein contained, and said 3381{ Director of Public Works having found that such improvements have been constructed and completed in full compliance with the terms and provisions of said contract and the plans and specifications therefor, and having approved and accepted said work and improvements and having heretofore issued his Certificate of Final Acceptance and so certified to said City Council and recommended that such City Council accept and receive said work and the improvements as constructed by said J. M. Dellinger, Inc.; and the said J. M. Dellinger, Inc, having heretofore furnished to and filed with se4d City Council its five -year Maintenance Bond in the amount, and executed by a corporate surety, as required and provided in said plans and specifications, and said Maintenance Bond having been found by said Director of Public Works and said City Council to be in proper form, amount and executed by an approved corporate surety, and having been approved as being in full compliance with the requirements of said contract and the plans and specifications therein contained; and said work and improvements having been found by the Mayor and City Council of said City to have been performed and completed, and said Maintenance Bond filed and approved, all in full compliance with said contract and plans and specifications therefor, same are hereby found to have been performed and completed by said J. M. Dellinger, Inc. in full compliance with the terms and provisions of said contract, and the plans and specifications therefor,, and same are here now accepted and received by the City Council of the City of Corpus Christi, Texas. SECTION 2.That the Mayor and City Secretary of said City are hereby authorized and directed to issue to J. M. Dellinger, Inc. special assessment certificates evidencing the assessments against property improved abutting upon said Ayers Street, within the limits above defined, and against the real and true owner or owners thereof, which, by the terms of such contract, the City of Corpus Christi, Texas, has agreed and obligated itself to issue and deliver to said J. M. Dellinger, Inc. in accordance with the provisions of the final assessment ordinance and other proceedings heretofore had and adopted by said City Council; said assessment certifi- Oates to be executed in the name of said City by the Mayor and City Secretary thereof and impressed with the seal of said City, and dated as of the date hereof, and such officers are hereby authorized and directed to execute said certificates in their official capacities on behalf of said City, and deliver same to said J. M. Dellinger, Inc.; and further, that the City Controller of said City is hereby authorized to make payment to said J. M. Dellinger, Inc. of the final estimate for amounts due from said City for such improvements out of the funds heretofore appropriated for payment of same. SECTION 3. The fact that Ayers Street, within the limits above defined, has become an important thoroughfare and connects important thoroughfares, and the fact that the present condition of the street is dangerous to the health and public welfare of the inhabitants thereof, creates a public emergency and an imperative public necessity, requiring the suspension of the Charter Rule, that no ordinance or resolution shall be passed finally on the date of its introduction, and that said ordinance shall be read at three several meetings of the City Council, and the Mayor having declared that such emergency and imperative public necessity exist, and having requested that said Charter Rule be suspended, and that this ordinance be passed finally on the date of its introduction, and that this ordinance take effect and be in full force and effect from and after its passage, IT IS SO ORDAINED. PASSED AND APPROVED this _LE& day of , A. D., 195. City of Corpus Chr sti, Texas ST: Cit¢ Secretary APPROVED AS TO LEGAL FORM; Citj Attorney CORPUS CHRISTI TEXAS TO THE MEMBERS OF THE CITY COUNCIL CORPUS CHRISTI, TEXAS GENTLEMEN: FOR THE REASONS SET FORTH IN THE EMERGENCY CLAUSE OF THE FOREGOING ORDINAR'CE, A PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST FOR THE SUSPEN- SION OF THE CHARTER RULE OR REQUIREMENT THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE IT IS INTRODUCED,' IT 65 1 ., AND THAT SUCH ORDINANCE OR RESOLUTION SHALL HE READ AT THREE MEETINGS OF THE CITY COUNCIL I, THEREFOREy HEREBY REQUEST THAT YOU SUSPEND SAID CHARTER RULE RULE OR REQUIREMENT AND PASS THIS ORDINANCE FINALLY ON THE DATE IT IS INTRODUCED, OR AT THE PRESENT MEETING OF THE CITY COUNCIL. RESPECTFULLY, CITY OF�CORPUS4LC FIRISTI, TEXAS THE CHARTER RULE WAS SUSPENDED BY THE FOLLOWING VOTE: LESLIE WASSERMAN d FRANK E. WILLIAMSON JACK DEFORREST GEORGE L. LOWMAN MIKE A. NEEDHAM, JR THE ABOVE ORDINANCE WAS PASSED BY THE FOLLOWING VOTE: LESLIE WASSERMAN FRANK E. WILLIAMSON JACK DEFORREST GEORGE L. LOWMAN MIKE A. NEEDHAM, JR 3 �� CITY OF CORPUS CHRISTI, TEXAS DEPARTMENT OF PUBLIC WORKS - ENGINEERING & CONSTRUCTION DIVISION CONTRACT MONTHLY ESTIMATE •oject _ are street ;ma )r rvmant5 from saldWin 3oulsvard to lexander �traet Est. No. 4 & l insl mtractor: J. M. Dellinger, Inc* _ Date_Januari 12, 1953 P. :a. az 4227 - �orsus Cb riati, TMao _ Sheet 1 _of_2 — tom Vo. Stem lloscription Unit Proj. )st. Quantities Total Work Done on Cunt. Contract Unit Price Amount L. t>troet ss:Xcavatinn >u.Yd. 5,931 5,904 2,40 14,169.66 ?: .tat -Mix Aggregate (0ravel Type A & D) Ton 6,237 #567 6,131.933 9.50 53,253.41 I. ;lot -mix Asahalt (0A -90) Ton 362.536 3179562 31#25 9,923.81 w hot•aLix Aggregate Gavel erne 7) Ton 6A612 651+7 9.75 6,354.07 i# Concrete Curie and flutter Lin*"- a'85tc.ij 6,922.2 1.45 10,03 7.19 61, C- omnacted caliche '.u.Ydo 1,702 1,740 3.10 5,394.00 t. Prime :goat W-1 'Al* 1,021 1,375 0.16 220.00 d, Surface Treatwnt Awphal't, OA-230 Aiale 5,701 6,380 0015 957000 7. Surface tment .over Stone (L.R*A.) u'u.Yd, 225 340 7.25 2,465.00 ). h- Ce ?- newer (15 ") iin.pto 540 668 4.75 3,173900 L. R* ;;. F. :mar (249 ;Lin.I`t 448 452 9050 4,294.00 20 !t. C. P. S (33' ") Li,n#F,t: 1,650 1,670 13.75 22,962 #50 3. H. C. '. corner (36f1) Lin.f�t 525 545 14,25 7,766.25 �# 3tanderd 5' Inlet at 1.9 24 160.00 3,840.00 �. Spacial Inlets a. 6 5 195,00 975.00 S. Aanholes (L' wfiameter) �B. 6 6 170.00 1,020,00 T. Special -3toam ;Sever structure .A. 1 1 2'NV*01 2,8W600 3. t0luating .xteting 5' Inlets: "Al 1 3 52.50 157x50 i7.• i2• it. MdYrBT (1��1 ;i � �I G€ graed Y'i c e) UT4 Ft . 57' 5.75 327.' 5 CITY OF CORPUS CHRISTI, TEXAS DEPARTMENT OF PUBLIC WORKS - ENGINEERING & CONSTRUCTION DIVISION CONTRACT MONTHLY ESTIMATE 'reject Ayers Street jmf wcnraa n r3 ty.,,,e deldxS.A 'lb rieysrti i� nzAnriwr �, .r�4 -- Est. No. - 'ontractor: 7. i si x er, Ine. _ Date hsnuawy + L;=- uz+ Christi Tm,a, — - Sheet_ o _ of .j - - No Item Descriplion I Unit Proj. F.et. Quantities Total Work Done on Cont. Contract Unit Price Amount '.i(T11",, ',Z'Rz -• 0(WrI#it1L+U _ _ I (,Sea Attached S'tateetent) 29 Lin. Vt. ironcrete ;;� � w1.(( 29.(X) 33 sq, Vt* "iidowilk 0*40 32 sq. Pts Concrete ;,rails Spilleay .AdJust ;iratr- Inlet 10000 i(.s'iit`L 10iRII'IT .9},}l➢;'. ii' dd 11'. U0T .. ..� .� o a — — e a . A155,155,0e Less Amount assessed against <)anera 61,249,43 (Original Property t era' its esme `41,347,30 I ) (LOGO Assessment for 10" utiiily a nt in ) (Lot 1, Block 2, Southmorsland 3ddi or ) (against Banxtett ,,eiser 97#87 ) ( 1, • -3 ) I i 'ertified 'orrect:- Chief of Engr. & Constr. approval recommended: Director of Puhlic Works .pproved: City Manager TOW "wl#3oinuity % Retained - , U Amount Payable 93,9(5 #65 Previous Payments 79,332,27 Date — -_ _ Due This Estimate _ 11,573.36 Estimate Checked `Date SPW 1 -12.5)