HomeMy WebLinkAbout03818 ORD - 07/28/1954IMS:AC :7/28/54
AN ORDINANCE
APPROPRIATING FROM NO. 200 GAS SYSTEM BOND IMPROVEhIENT
FUND THE SUM OF :"120,138.46 FOR THE CONSTRUCTION OF THE
PROJECT DESIGNATED AS "REHABILITATION OF GAS MAINS AND
SERVICES IN THE HILLCREST AREA" OF THE CITY OF CORPUS
CHRISTI, BEING $44,235-96 MATERIALS ACQUIRED BY AND
TO BE FURNISHED BY THE CITY TO THE CONTRACTOR] CONTRACTOR'S
SERVICES IN THE AMOUNT OF ,69,002.50, AND THE SUM OF
&16,900.00 FOR ENGINEERING AND CONTINGENCIES; AUTHORIZING
AND DIRECTING THE CITY MANAGED TO EXECUTE FUR AND ON BEHALF
OF THE CITY A CONTRACT ',flTH ENIX CONSTRUCTION COMPANY FOR
THE CONSTRUCTION WORK ON SAID PROJECT, IN ACCORDANCE IdITH
PLANS AND SPECIFICATIONS AND CONTRACT DOCUMENTS MADE A
PART HEREOF BY REFERENCE; AND DECLARING AN EITAERGENCY.
13E IT ORD; ^,INED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI,
TEXAS:
SECTION 1. THAT THERE IS HEREBY APPROPRIATED FROM NO. 200 GAS
SYSTEM BOND IMPROVEMENT FUND THE SUM OF r'i12O,138.146 FOR THE CONSTRUCTION OF
THE PROJECT DESIGNATED AS "REHABILITATION OF GAS MAINS AND SERVICES ill THE
HILLCREST AREA" OF THE CITY OF CORPUS CHRISTI, BEING P44,235.96 FOR MATERIALS .
A LIST OF WHICH IS ATTACHED
ACQUIRED BY AND TO BE FURNISHED BY THE CITY TO THE CONTRA C TOR,/COPITRACTOR'S HERETO
SERVICES IN THE AMOUNT OF �69,002.50, AI4D THE SUM OF 'y6,90D.OG FOR ENGINEERING
AND CONTINGENCIES,
SECTION 2. THAT THE CITY MANAGER OF THE CITY OF CORPUS CHRISTI,
FOR AND ON DEHALF OF THE CITY OF CORPUS CHRISTI, BE, AND HE IS HEREBY AUTHORIZED
AND DIRECTED TO EXECUTE A CONTRACT WITH ENIX CONSTRUCTION COMPANY .FOR THE CON -
STRUCTIODI WORK ON SAID PROJECT, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS AND
CONTRACT DOCUMENTS, MADE A PART HEREOF BY REFERENCE, ALL OF WHICH ARE ON FILE
IN THE OFFICE OF THE CITY SECRETARY.
SECTION 3. THE NECESSITY FOR THE REHABILITATION OF GAS MAINS AND
SERVICES IN THE HILLCREST AREA TO GIVE THE BEST SERVICE POSSIBLE TO PERSONS
RESIDING IN THAT AREA CREATES A PUBLIC EMERGENCY AND AN IMPERATIVE PUBLIC
NECESSITY REQUIRING THE SUSPENSION OF THE CHARTER RULE THAT NO ORDINANCE OR
RESOLUTION SHALL BE PASSED FINALLY ON THE DATE IT IS INTRODUCED AND THAT SUCH
ORDINANCE OR RESOLUTION SHALL BE READ AT THREE SEVERAL MEETINGS OF THE CITY
COUNCIL, AND THE MAYOR, HAVING DECLARED SUCH EMERGENCY AND NECESSITY TO EXIST,
REQUESTING THE SUSPENSION OF SAID CHARTER RULE AND THAT THIS ORDINANCE BE
v jI
PASSED FINALLY ON THE DATE: OF ITS INTRODUCTION AND TAKE EFFECT AND 9C IN
FULL FORCE AND EFFECT FROM AND AFTER ITS PASSAGE, IT 15 ACCORDINGLY PASSED
AND APPROVED, THIS THE 26TH DAY OF DULY, 1954.
rlAy
THE CITY OF C PUS CHRISTI, TEXAS
ATTES
/ iL t
CITY SECRETARY ;
APPROVED AS TO GAL FORM:
CITY AT ORNEY
V REHABILITATION OF GAS SYSTEM - HILLCREST PUG 1 -A
WORK DONE BY ENIX CONSTRUCTION CO.
ESTIMATE OF COST
PROJECT NO. P.U.G. I -A LOCATION HILLCREST AREA
QUANTITY
SIZE
DESCRIPTION
MATERIAL
INSTALLATION
MATERIAL 8
INSTALLATION
UNIT COST
TOTAL COST
UNIT COST
TOTAL COST
SUB TOTAL
40,123.15
69 002.50
_
5% 'NAREHOUSE CHG
2,006.34
10 ENGR. & PL.
4,012.31
6 900.25
5% CONT.
2 006.34
F48,148.14
TOTAL COST MATERIAL
_ _
_ _ _ _ _ _ _ _ 175.902.75
TOTAL INSTALLATION COST
TOTAL COST MATERIAL AND INSTALLATION
124,050.89
JUSTIFICATION
RMH :ae
7/22/54
' I i
ACTUAL COST
MATERIAL AND. LABOR, USED ON JOB
QUANTITY I SIZE DESCRIPTION I GONST AMOUNT LABOR I AMOUNT
1 11 MISCELLANEOUS COST I UNIT COST I AMOUNT
Total Coat of Job
Reclaimed on
Materials Abandoned on
W ar 11 a c. C..ewnsu CO.
Date Work Commenced_ Date Work Completed
ESTIMATE OF COST
,onTC� m —n DIII I_A LOCATION HILLCREST AREA
QUANTITY
SIZE
DESCRIPTION
MATERIAL
INSTALLATION
MATERIAL @
INSTALLATION
UNIT COST
TOTAL COST
UNIT COST
TOTAL COST
208
3/4 X 4
MASH I NE BOLTS
.28
58.24
240
5/8 X 4
4 "
.28
67.20
2
B"
RING GASKETS
.35
.70
24
6"
it
.17
4 08
30
411
" "
.12
3.60
93
VALVE Boxes &LDS
5.50
511,5
93
LONG EXTENSIONS
1.45
134.85
y 93
SHORT EXTENSIONS
1.06
97.65
6
50#
ANODES
23.1
138.75
23
17#
ANODES
7.93
182.39
15
100#
BAGS OF BACKFILL
3.40
51.00
6
ROLLS
PIPE LINE FELT
18.40
110.40
6
BBLS
" " ENAMEL
22.20
133.20
107
2"
STYLE 39 DRESSERS
5.26
557.56
940
1"
MUELLER 11 -102 STOPCOCK
1.67
1.604.60
680
1"
STYLE 90 DRESSERS 11j
3.13
2+128.40
TOTAL COST MATERIAL
TOTAL INSTALLATION COST
TOTAL COST MATERIAL AND INSTALLATION
4
JUSTIFICATION - - -" - - --
RMH:is
7/22/54
ACTUAL COST
MATERIAL AND LABOR USED ON JOB
QUANTITY I SIZE DESCRIPTION ` COST AMOUNT LABOR I AMOUNT
1 11 MISCELLANEOUS COST I UNIT COST I AMOUNT
Total Cost of Job
Materials Reclaimed on Job
Abandoned on
Date Work Commenced Date Work Completed
ESTIMATE OF COST
PROJECT NO. P.U.G. 1 -A LOCATION H I LLCREST AREA
QUANTITY
SIZE
DESCRIPTION
MATERIAL
INSTALLATION
MATERIAL 8
INSTALLATION
UNIT COST
TOTAL COST
UNIT COST
TOTAL COST
2
6 X 4
REDUCING OUTLET TEES
63.28
63.28
2
811
8 X 8 X 6 STO. TEES
50.62
101.24
3
611
6 X 6 X 6" 11
27.56
82.68
1
411
4 X 4 X 4 " "
14.62
14.62
23
211
2 X 2 X 2" °°
5.62
129.62
10
611
900 WELD ELL LONG RAD.
12.64
126.40
10
411
It II It 11 It
5.98
59.80
8
211
It n. n n n
1.87
14.96
8
611
450 II 11 11 It
16.04
128.32
5
4"
11 It " It
4.68
23.45
_
1
8 X 6
WELD REDUCER
8.97
8.97
2
8 X 4
" "
5.98
11.96
3
6 X 4
" "
5.98
17.67
2
6 X 2
" "
7.83
15.66
_
1
4 X 2
It "
2.99
2.99
1
611
BLIND FLANGE SERIES 15
6.10
6.10
7
4t1
It If It 11
4.59
4.59
TOTAL COST MATERIAL
TOTAL INSTALLATION COST
TOTAL COST MATERIAL AND INSTALLATION
JUSTIFICATION
Mi:,ie
7/22/54
ACTUAL COST
MATERIAL AND • LABOR USED ON JOB '
QUANTITY I SIZE DESCRIPTION I COST AMOUNT LA90R I AMOUNT
11 MISCELLANEOUS COST I UNIT COST I AMOUNT
Total Cost of Job
Reclaimed on
Materials Abandoned on
Date Work Commenced_ Date Work Completed
ESTIMATE OF COST
PROJECT NO. P.U.G. 1 -A LOCATION HILLCREST AREA
QUANTITY
SIZE
r E S C R I PT I ON
MATERIAL
INSTALLATION
MATERIAL e
INSTALLATION
UNIT COST
TOTAL COST
UNIT COST
TOTAL COST
1650'
8"
STEEL PIPE
1.5707
2,591.65
1.75
2,887.5
9000'
611
" II
.9643
8,678.70
1.55
15,950.0
9600'
4"
IT "
.6090
5,846.4
1.40
13,440.0
30980'
2"
of If
.2358
7,305.08
1.25
38,725.0
1650'
811
COATING & WRAPPING
.2700
445.5
9000'
6"
to of
.2070
1,863.00
9600'
4"
It It
.1650
1,584.
_
309801
211
II 11
.0925
2,865.65
1
811
FIG. 143 NORO. L.P.V.
98.01
98.01
12
611
11 to 11 "
65.34
784.08
15
4"
" IT IT 11
26.14
392.10
107
2"
MUELLER 11 -100 STOPCOCKS
4.73
506.11
2
8"
W.N. FLANGES SERIES 15
10.50
21.00
23
6"
11 IT it 11
9.51
218.73
31
4"
to 'I 11 "
6.45
199.95
1
8 X 4
REDUCING OUTLET TEE
63.28
63.26
1
8 X 6
_
" " It
63.28
63.2
TOTAL COST MATERIAL
TOTAL INSTALLATION COST
TOTAL COST MATERIAL AND INSTALLATION
JUSTIFICATION
RMH:js
7/22/54
ACTUAL COST
MATERIAL AND • L'AE -OR USED ON JOB
QUANTITY I SIZE DESCRIPTION UNIT
COST AMOU NT LABOR AMOUNT
I I I 1 II MISCELLANEOUS COST I UNIT COST I AMOUNT
Total Coat of Job
Materials Reclaimed on
Materials Abandoned on
Date Work Commenced - Date Work Completed
JULY 28, 195+
I CERTIFY TO THE CITY COUNCIL THAT THE MONEY REQUIRED FOR
THE CONTRACT, AGREEMENTp OBLIGATIONI OR EXPENDITURE CONTEMPLATED IN THE
ABOVE AND FOREGOING ORDINANCE 15 IN THE TREASURY OF THE CITY OF CORPUS
CHRISTI TO THE CREDIT OF No. 200 GAS SYSTEM BOND IMPROVEMENT
FUND FROM WHICH IT 15 PROPOSED TO BE DRAWN AND SUCH MONEY IS NOT APPROPRIATED
FOR ANY OTHER PURPOSE.
7
dy" .
DIRECTOR OF TINA CE ,I
I�
Corpus Christi, Texas
jf
1954,
TO THE MESMBIMS W J. ";9- C7;i kbO?,,iSCIL
Cmspus_Chxn;`�n,
Gentlemen.
FSr the zte;sor- Earth in tl" "e e:.meregency clause of the
foregoing ardinan -re, n puLIJU eota 'geucy o nd dEAt- ➢erative necessity exist
foL the suspensitsa air aie requaxwent that ns ordinance
er resolution : "t an %ne slate it is introduced,
and that such ®rdina- -a:.sa p,r shall be read at three meetings
of the City CounefA� I, : eiPefere, ueTM6ls= oq:at =_t that you suspend said
Charter rule or recluarwnent and s ,r s; Vtis mrdinance finally on the date
it is introduced, or at the presfut meel.iuo of Life City Ceuncil,
aeespect.fully,
f
�lleti'� �
4; 3°1 ' ` QE CQI;PUS C sir, TEX
The Charter rule was --u-g crade.d by the fall wing vote.
F. C. CTallawy
ULr®d
jarmes S. Naisrmith
W. James Brace
P. P. ,Peterson, Jr
Tht abosvt ]rnsssiad by the fellewing vote, 1
I yl
C. Callaway C -- ---- /
q ID,ey King
James S. Naisrteith
W. James Brace
r. n'etersmn, Jr