HomeMy WebLinkAbout03818 ORD - 07/28/1954IMS:AC :7/28/54 AN ORDINANCE APPROPRIATING FROM NO. 200 GAS SYSTEM BOND IMPROVEhIENT FUND THE SUM OF :"120,138.46 FOR THE CONSTRUCTION OF THE PROJECT DESIGNATED AS "REHABILITATION OF GAS MAINS AND SERVICES IN THE HILLCREST AREA" OF THE CITY OF CORPUS CHRISTI, BEING $44,235-96 MATERIALS ACQUIRED BY AND TO BE FURNISHED BY THE CITY TO THE CONTRACTOR] CONTRACTOR'S SERVICES IN THE AMOUNT OF ,69,002.50, AND THE SUM OF &16,900.00 FOR ENGINEERING AND CONTINGENCIES; AUTHORIZING AND DIRECTING THE CITY MANAGED TO EXECUTE FUR AND ON BEHALF OF THE CITY A CONTRACT ',flTH ENIX CONSTRUCTION COMPANY FOR THE CONSTRUCTION WORK ON SAID PROJECT, IN ACCORDANCE IdITH PLANS AND SPECIFICATIONS AND CONTRACT DOCUMENTS MADE A PART HEREOF BY REFERENCE; AND DECLARING AN EITAERGENCY. 13E IT ORD; ^,INED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. THAT THERE IS HEREBY APPROPRIATED FROM NO. 200 GAS SYSTEM BOND IMPROVEMENT FUND THE SUM OF r'i12O,138.146 FOR THE CONSTRUCTION OF THE PROJECT DESIGNATED AS "REHABILITATION OF GAS MAINS AND SERVICES ill THE HILLCREST AREA" OF THE CITY OF CORPUS CHRISTI, BEING P44,235.96 FOR MATERIALS . A LIST OF WHICH IS ATTACHED ACQUIRED BY AND TO BE FURNISHED BY THE CITY TO THE CONTRA C TOR,/COPITRACTOR'S HERETO SERVICES IN THE AMOUNT OF �69,002.50, AI4D THE SUM OF 'y6,90D.OG FOR ENGINEERING AND CONTINGENCIES, SECTION 2. THAT THE CITY MANAGER OF THE CITY OF CORPUS CHRISTI, FOR AND ON DEHALF OF THE CITY OF CORPUS CHRISTI, BE, AND HE IS HEREBY AUTHORIZED AND DIRECTED TO EXECUTE A CONTRACT WITH ENIX CONSTRUCTION COMPANY .FOR THE CON - STRUCTIODI WORK ON SAID PROJECT, IN ACCORDANCE WITH PLANS AND SPECIFICATIONS AND CONTRACT DOCUMENTS, MADE A PART HEREOF BY REFERENCE, ALL OF WHICH ARE ON FILE IN THE OFFICE OF THE CITY SECRETARY. SECTION 3. THE NECESSITY FOR THE REHABILITATION OF GAS MAINS AND SERVICES IN THE HILLCREST AREA TO GIVE THE BEST SERVICE POSSIBLE TO PERSONS RESIDING IN THAT AREA CREATES A PUBLIC EMERGENCY AND AN IMPERATIVE PUBLIC NECESSITY REQUIRING THE SUSPENSION OF THE CHARTER RULE THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE IT IS INTRODUCED AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE SEVERAL MEETINGS OF THE CITY COUNCIL, AND THE MAYOR, HAVING DECLARED SUCH EMERGENCY AND NECESSITY TO EXIST, REQUESTING THE SUSPENSION OF SAID CHARTER RULE AND THAT THIS ORDINANCE BE v jI PASSED FINALLY ON THE DATE: OF ITS INTRODUCTION AND TAKE EFFECT AND 9C IN FULL FORCE AND EFFECT FROM AND AFTER ITS PASSAGE, IT 15 ACCORDINGLY PASSED AND APPROVED, THIS THE 26TH DAY OF DULY, 1954. rlAy THE CITY OF C PUS CHRISTI, TEXAS ATTES / iL t CITY SECRETARY ; APPROVED AS TO GAL FORM: CITY AT ORNEY V REHABILITATION OF GAS SYSTEM - HILLCREST PUG 1 -A WORK DONE BY ENIX CONSTRUCTION CO. ESTIMATE OF COST PROJECT NO. P.U.G. I -A LOCATION HILLCREST AREA QUANTITY SIZE DESCRIPTION MATERIAL INSTALLATION MATERIAL 8 INSTALLATION UNIT COST TOTAL COST UNIT COST TOTAL COST SUB TOTAL 40,123.15 69 002.50 _ 5% 'NAREHOUSE CHG 2,006.34 10 ENGR. & PL. 4,012.31 6 900.25 5% CONT. 2 006.34 F48,148.14 TOTAL COST MATERIAL _ _ _ _ _ _ _ _ _ _ 175.902.75 TOTAL INSTALLATION COST TOTAL COST MATERIAL AND INSTALLATION 124,050.89 JUSTIFICATION RMH :ae 7/22/54 ' I i ACTUAL COST MATERIAL AND. LABOR, USED ON JOB QUANTITY I SIZE DESCRIPTION I GONST AMOUNT LABOR I AMOUNT 1 11 MISCELLANEOUS COST I UNIT COST I AMOUNT Total Coat of Job Reclaimed on Materials Abandoned on W ar 11 a c. C..ewnsu CO. Date Work Commenced_ Date Work Completed ESTIMATE OF COST ,onTC� m —n DIII I_A LOCATION HILLCREST AREA QUANTITY SIZE DESCRIPTION MATERIAL INSTALLATION MATERIAL @ INSTALLATION UNIT COST TOTAL COST UNIT COST TOTAL COST 208 3/4 X 4 MASH I NE BOLTS .28 58.24 240 5/8 X 4 4 " .28 67.20 2 B" RING GASKETS .35 .70 24 6" it .17 4 08 30 411 " " .12 3.60 93 VALVE Boxes &LDS 5.50 511,5 93 LONG EXTENSIONS 1.45 134.85 y 93 SHORT EXTENSIONS 1.06 97.65 6 50# ANODES 23.1 138.75 23 17# ANODES 7.93 182.39 15 100# BAGS OF BACKFILL 3.40 51.00 6 ROLLS PIPE LINE FELT 18.40 110.40 6 BBLS " " ENAMEL 22.20 133.20 107 2" STYLE 39 DRESSERS 5.26 557.56 940 1" MUELLER 11 -102 STOPCOCK 1.67 1.604.60 680 1" STYLE 90 DRESSERS 11j 3.13 2+128.40 TOTAL COST MATERIAL TOTAL INSTALLATION COST TOTAL COST MATERIAL AND INSTALLATION 4 JUSTIFICATION - - -" - - -- RMH:is 7/22/54 ACTUAL COST MATERIAL AND LABOR USED ON JOB QUANTITY I SIZE DESCRIPTION ` COST AMOUNT LABOR I AMOUNT 1 11 MISCELLANEOUS COST I UNIT COST I AMOUNT Total Cost of Job Materials Reclaimed on Job Abandoned on Date Work Commenced Date Work Completed ESTIMATE OF COST PROJECT NO. P.U.G. 1 -A LOCATION H I LLCREST AREA QUANTITY SIZE DESCRIPTION MATERIAL INSTALLATION MATERIAL 8 INSTALLATION UNIT COST TOTAL COST UNIT COST TOTAL COST 2 6 X 4 REDUCING OUTLET TEES 63.28 63.28 2 811 8 X 8 X 6 STO. TEES 50.62 101.24 3 611 6 X 6 X 6" 11 27.56 82.68 1 411 4 X 4 X 4 " " 14.62 14.62 23 211 2 X 2 X 2" °° 5.62 129.62 10 611 900 WELD ELL LONG RAD. 12.64 126.40 10 411 It II It 11 It 5.98 59.80 8 211 It n. n n n 1.87 14.96 8 611 450 II 11 11 It 16.04 128.32 5 4" 11 It " It 4.68 23.45 _ 1 8 X 6 WELD REDUCER 8.97 8.97 2 8 X 4 " " 5.98 11.96 3 6 X 4 " " 5.98 17.67 2 6 X 2 " " 7.83 15.66 _ 1 4 X 2 It " 2.99 2.99 1 611 BLIND FLANGE SERIES 15 6.10 6.10 7 4t1 It If It 11 4.59 4.59 TOTAL COST MATERIAL TOTAL INSTALLATION COST TOTAL COST MATERIAL AND INSTALLATION JUSTIFICATION Mi:,ie 7/22/54 ACTUAL COST MATERIAL AND • LABOR USED ON JOB ' QUANTITY I SIZE DESCRIPTION I COST AMOUNT LA90R I AMOUNT 11 MISCELLANEOUS COST I UNIT COST I AMOUNT Total Cost of Job Reclaimed on Materials Abandoned on Date Work Commenced_ Date Work Completed ESTIMATE OF COST PROJECT NO. P.U.G. 1 -A LOCATION HILLCREST AREA QUANTITY SIZE r E S C R I PT I ON MATERIAL INSTALLATION MATERIAL e INSTALLATION UNIT COST TOTAL COST UNIT COST TOTAL COST 1650' 8" STEEL PIPE 1.5707 2,591.65 1.75 2,887.5 9000' 611 " II .9643 8,678.70 1.55 15,950.0 9600' 4" IT " .6090 5,846.4 1.40 13,440.0 30980' 2" of If .2358 7,305.08 1.25 38,725.0 1650' 811 COATING & WRAPPING .2700 445.5 9000' 6" to of .2070 1,863.00 9600' 4" It It .1650 1,584. _ 309801 211 II 11 .0925 2,865.65 1 811 FIG. 143 NORO. L.P.V. 98.01 98.01 12 611 11 to 11 " 65.34 784.08 15 4" " IT IT 11 26.14 392.10 107 2" MUELLER 11 -100 STOPCOCKS 4.73 506.11 2 8" W.N. FLANGES SERIES 15 10.50 21.00 23 6" 11 IT it 11 9.51 218.73 31 4" to 'I 11 " 6.45 199.95 1 8 X 4 REDUCING OUTLET TEE 63.28 63.26 1 8 X 6 _ " " It 63.28 63.2 TOTAL COST MATERIAL TOTAL INSTALLATION COST TOTAL COST MATERIAL AND INSTALLATION JUSTIFICATION RMH:js 7/22/54 ACTUAL COST MATERIAL AND • L'AE -OR USED ON JOB QUANTITY I SIZE DESCRIPTION UNIT COST AMOU NT LABOR AMOUNT I I I 1 II MISCELLANEOUS COST I UNIT COST I AMOUNT Total Coat of Job Materials Reclaimed on Materials Abandoned on Date Work Commenced - Date Work Completed JULY 28, 195+ I CERTIFY TO THE CITY COUNCIL THAT THE MONEY REQUIRED FOR THE CONTRACT, AGREEMENTp OBLIGATIONI OR EXPENDITURE CONTEMPLATED IN THE ABOVE AND FOREGOING ORDINANCE 15 IN THE TREASURY OF THE CITY OF CORPUS CHRISTI TO THE CREDIT OF No. 200 GAS SYSTEM BOND IMPROVEMENT FUND FROM WHICH IT 15 PROPOSED TO BE DRAWN AND SUCH MONEY IS NOT APPROPRIATED FOR ANY OTHER PURPOSE. 7 dy" . DIRECTOR OF TINA CE ,I I� Corpus Christi, Texas jf 1954, TO THE MESMBIMS W J. ";9- C7;i kbO?,,iSCIL Cmspus_Chxn;`�n, Gentlemen. FSr the zte;sor- Earth in tl" "e e:.meregency clause of the foregoing ardinan -re, n puLIJU eota 'geucy o nd dEAt- ➢erative necessity exist foL the suspensitsa air aie requaxwent that ns ordinance er resolution : "t an %ne slate it is introduced, and that such ®rdina- -a:.sa p,r shall be read at three meetings of the City CounefA� I, : eiPefere, ueTM6ls= oq:at =_t that you suspend said Charter rule or recluarwnent and s ,r s; Vtis mrdinance finally on the date it is introduced, or at the presfut meel.iuo of Life City Ceuncil, aeespect.fully, f �lleti'� � 4; 3°1 ' ` QE CQI;PUS C sir, TEX The Charter rule was --u-g crade.d by the fall wing vote. F. C. CTallawy ULr®d jarmes S. Naisrmith W. James Brace P. P. ,Peterson, Jr Tht abosvt ]rnsssiad by the fellewing vote, 1 I yl C. Callaway C -- ---- / q ID,ey King James S. Naisrteith W. James Brace r. n'etersmn, Jr