Loading...
HomeMy WebLinkAbout04979 ORD - 02/19/1958IMS:EB:2 /19/58 AN ORDINANCE AUTHORIZING AND DIRECTING THE CITY MANAGER TO ACCEPT FOR AND ON BEHALF OF THE CITY OF CORPUS CHRISTI, THE PROPOSAL OF CATHODIC PROTECTION SERVICE FOR FURNISHING THE CITY WITH AN ENGINEERING REPORT AND SURVEY OF THE SEVERITY OF CORROSION ALONG THE CITY'S -INCH CAST IRON WATER LINE FROM -0U LEN TO BALDrJIN - PHASE ONE - FOR A COST OF T2, 00.00 A COPY OF WHICH PROPOSAL IS ATTACHED HERETO; AND DECLARING AN EMERGENCY. BE IT ORDAINED BY THE CITY COUNCIL OF THE CITY OF CORPUS CHRISTI, TEXAS: SECTION 1. THAT THE CITY MANAGER IS HEREBY AUTHORIZED AND DIRECTED TO ACCEPT, FOR AND ON BEHALF OF THE CITY OF CORPUS CHRISTI, THE PROPOSAL OF CATHODIC PROTECTION SERVICE FOR FURNISHING THE CITY WITH AN ENGINEERING REPORT AND SURVEY OF THE SEVERITY OF CORROSION ALONG THE CITY'S 36 -INCH CAST IRON WATER LINE FROM CALALLEN TO BALDWIN - PHASE ONE - FOR A COST OF $2,600.00, A COPY OF WHICH PROPOSAL 15 ATTACHED HERETO AND MADE A PART HEREOF. SECTION 2. THE NECESSITY FOR IMMEDIATELY ACCEPTING THE PROPOSAL DESCRIBED IN SECTION 1 HEREOF FOR FURNISHING rHE CITY WITH AN ENGINEERING REPORT AND SURVEY OF THE SEVERITY OF CORROSION ALONG THE SAID WATER LINE CREATES A PUBLIC EMERGENCY AND AN IMPERATIVE PUBLIC NECESSITY REQUIRING THE SUSPENSION OF THE CHARTER RULE PROVIDING THAT NO ORDINANCE OR RESOLUTION SHALL BE PASSED FINALLY ON THE DATE OF ITS INTRODUCTION AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE SEVERAL MEETINGS OF THE CITY COUNCIL, AND THE MAYOR, HAVING DECLARED SUCH EMERGENCY AND NECESSITY TO EXIST, AND HAVING REQUESTED THE SUSPENSION OF SAID CHARTER RULE AND THAT THIS ORDINANCE BE PASSED FINALLY ON THE DATE OF ITS INTRODUCTION AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE SEVERAL MEETINGS OF THE CITY COUNCIL, AND THE MAYOR, HAVING DECLARED SUCH EMERGENCY AND NECESSITY TO EXIST, AND HAVING REQUESTED THE SUSPENSION OF SAID CHARTER RULE AND THAT THIS ORDI- NANCE BE PASSED FINALLY ON THE DATE OF ITS INTRODUCTION AND TAKE EFFECT AND BE IN FULL FORCE AND EFFECT FROM AND AFTER ITS PASSAGE, IT IS ACCORDINGLY SO ORDAINED. 91 PASSED AND APPROVED, THIS THE DAY OF FEBRUARY, 1958• MAYOR THE CITY OF CORPUS CHRISTI, TEXAS ATTEST: I Wa' I CITY SECRETAR APPROVED AS TO LEGAL FORM FEBRUARY 17, 1g 8:,. CITY ATTORN Y —T-1— IN THE CATHODIC PROTECTION FIELD FROM AN INSULATING WASHER TO A TURNKEY CONTRACT INSTALLATION 4601 1-10R. • P. O. Box 6387 cathodic protection service TELEPHONE 1A2 -5171 HOUSTON 6, TEXAS Jonwry 16, 19% Mr. Herald C. Latch, Director Departneast of Pablic utilities City of Corpus Christi Crpus Christi, %cos Attentions Mr. Atlas Csmningbaa stater mveriatenuzkt 9entlemsul As outlined, during our recent conference On a corrosion survey of your 36" cost iron vatrr mpin from Calallan to the Savage lane O reservoir, it is recommended that oxaglaserisg services required be cant. plated in the following pbassss Please Is aw"y of severity of car mum along the Hof the line, detea"misetien of current require- ments fOr protection) Of the affected sections of the Limp and preliminary estimates of costs for cathodic protection of the line. A complete engineering report of findings, rov meaendatioes, and Preliminary cost P estimates will be submitted fallowing the 00MIstiou of Phase 1. Phase III Design, speoifieatiorta, and final cast esti- mate r the cathodio protection system required for the line. Phase IM firing supervision of conetraotion and ?sck of the cathodic protections system. Y CAMWIC YAQMTM 61MICt proposer to conplate phase I far a bow VAN of $8,600.00, based on approximately 22 vnerhang days for oosplsiiem of field vrork and ing report. The above lure is based em orb Stan. dard rate of $100) day and $0.00 /ails tranaportetioda for Our Wginew and instruarnts, plus labor and equipment Mental for immm odes, required for vi-1 inspection of the line at points directed by imstru ssafttion. the survey of corrosion severity and cathodic protection roquirsaasts rill, son. mist Of a detailed 0031 resistivity survey, cumot ragnirearsast analysis, Visual inspection Of the line at points directed by data, an analysis of lino currants Where possible, calculations of projected life of the line, etc. father veork to be cmVleted, as well as the type engineering report to be submitted, are listed tender Pbase I descriptions above. City of Corpus Christi (Coat.) - 2 - jambs" 16, 1958 The cost for Phase 11 and Phase IIi cannot be accurately estimated at this time since the cost for each will be depaudtant upon findings is Phase 1. WO are pleased to have Lad the opportuaaty to discuss this important phase of your mal tenance program with you and will be pleased to smover my question you may have concerning the proposed work, at your convenience. Yawn very tray, CAS_ "ld7�IC P�Qdf :V � NW:mt cot CPO, Corpus Christi CORp�U� CHRISTI, TEXAS - ,193 TO THE MEMBERS'OF THE CITY COUNCIL CORPUS CHRISTI, TEXAS GENTLEMEN: FOR THE REASONS SET FORTH IN THE EMERGENCY CLAUSE OF THE FORE- GOING ORDINANCE, A PUBLIC EMERGENCY AND IMPERATIVE NECESSITY EXIST FOR THE SUSPENSION OF THE CHARTER RULE OR REQUIREMENT THAT NOORDINANCE ORRESOLU- TION SHALL BE PASSED FINALLY ON THE DATE IT - -15 INTRODUCED, AND THAT SUCH ORDINANCE OR RESOLUTION SHALL BE READ AT THREE MEETINGS OF THE CITY COUNCILS 1, THEREFORE, HEREBY REQUEST THAT YOU SUSPEND SAID CHARTER RULE OR REQUIREMENT AND PASS THIS ORDINANCE FINALLY ON THE DATE IT IS INTRO- DUCED, OR AT THE PRESENT MEETING OF THE CITY COUNCIL. RESPECTFULLY, MA THE CITY OF CORPUS CHRISTI, TEXAS THE CHARTER RULE WAS SUSPENDED BY THE FOLLOWING VOTED: FARRELL D. SMIiH W. J. ROBERTS B. E. BIGLER MANUEL P. MALDONADO. 6' CHARLIE J. AILLS ARTHUR R. JAMES + ODELL INGLE LCiC THE ABOVE ORDINANCE WAS PASSED BY THE FOLLOWING VOTE: FARRELL D. SMITH W. J. ROBERTS "A B. E. BIGLER MANUEL P. MALDONADO CHARLIE J. AILLS ARTHUR R. JAMES ODELL INGLE qq�v